UTILITY COMMITTEE
AGENDA
APRIL 14, 2014 - 5:00 P.M.
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA
DOVER, DELAWARE
Public comments are welcomed on any item and will be permitted at appropriate times.
When possible, please notify the City Clerk (736-7008 or e-mail at CityClerk@dover.de.us)
should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. Proposed Amendments to the Retail Customer Demand Response Program
(Staff recommends revising the second paragraph of the Retail Customer Demand Response to include
energy efficiency)
2. TEA/NAES Report (February)
(Staff recommends acceptance of the report)
3. Garrison Oak Technical Park Project Updates
A. City Infrastructure
(Committee action not required)
B. Calpine Energy Center
(Committee action not required)
C. Dover Sun Park
(Committee action not required)
4. Adjournment by 5:25 p.m.
/tm
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Agendas\2014\04-14-2014 UTILITY.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE
THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Página 2
ACTION FORM
PROCEEDING: Utility Committee
DEPARTMENT OF ORIGIN: City Manager’s Office DATE SUBMITTED: April 8, 2014
PREPARED BY: Scott D. Koenig, P.E., City Manager
SUBJECT: Proposed Amendment to the Demand Response Program
REFERENCE: N/A
RELATED PROJECT: N/A
REVIEWED BY: Scott D. Koenig, P.E., City Manager
EXHIBITS: Exhibit A – Page 31 of the City of Dover Electric Rates & Tariffs
EXPENDITURE REQUIRED: N/A AMOUNT BUDGETED: N/A
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
TIME TIMETABLE: Implement tariff change upon final approval of City Council.
RECOMMENDED ACTION: Revise the 2nd paragraph of the Retail Customer Demand Response to include
energy efficiency.
BACKGROUND AND ANALYSIS
The City of Dover partners with DEMEC to manage our Demand Response Program (DRP). DEMEC functions as our
Authorized Designee per our approved tariff. Recently, DEMEC has asked for the City to clarify whether or not Energy
Efficiency is included in the Demand Response Program. This inquiry was forwarded to Kirk Betts, Betts & Holt, LLP to
review since Mr. Betts functions as the City’s power supply attorney. Mr. Betts has replied as follows:
“The intent of the provision was to include PJM’s Demand (Load) Response programs subject to Dover or its authorized
designee having oversight of the participant and its performance. At the time this rule was drawn, I believe Dover
focused on capacity and ancillary services markets, not the more passive Energy Efficiency program. Demand reduction
was important since Dover needed to plan its capacity purchases and wanted to take into account these resources in its
planning.
“It would be reasonable to include Energy Efficiency under the same terms as the highlighted paragraph. I recommend a
short amendment to include “Energy Efficiency” in the highlighted paragraph where the programs are listed,
notwithstanding that most of those are ancillary services.
“I believe including it is consistent with the intent of the drafters at the time and presumably now, but it should be
documented in the rule. Programmatically, Energy Efficiency is bid into the RPM market for up to 4 years, but there is a
requirement to demonstrate the change, which Converge would do. It is good to have this information since it does affect
the City’s forward energy positions.”
Based on Mr. Betts’ opinion, staff proposes the 2nd paragraph (highlighted on the exhibit) be amended to read as follows:
“Dover or its authorized designee may allow a Customer to bid DR into PJM’s ancillary services market for energy
imbalance, energy efficiency, spinning reserves, supplemental reserves, reactive power and voltage control, or regulation
and frequency response ancillary services, subject to the same terms and conditions.”
Página 4
The Energy Authority, Inc.
Monthly Management Committee Update – February 2014
March 27, 2014
Prepared by:
Robert Trinnear
Client Services Manager
904.360.1309
rtrinnear@teainc.org
Página 5
TABLE OF CONTENTS
I. Executive Summary 1
II. Budget Report 12
III. Operations Management 15
IV. Appendix 29
i
Página 6
I. Executive Summary
A. Power Supply Summary:
Overall Power Supply costs were $1,165,513 over budget due to higher load and higher
market prices caused by below normal weather temperatures.
Dover’s budgeted cost for all power supply (capacity AND energy) was $81.18/MWh.
The actual cost of all power supply (capacity AND energy) was $92.09/MWh.
The cost of energy alone was $64.95/MWh, versus a budgeted energy cost of $49.42.
Dover’s hedge purchases totaled 41,760 MWh, which was 68% of the actual load. The
budgeted hedge purchase totaled 27,840, which was 50% of the budgeted load.
Dover’s power purchases from hedge transactions totaled $1,996,784. Purchases from
PJM (energy and fees) totaled $2,228,410 with DA Energy purchases totaling $992,520,
DA transmission congestion totaling $300,952 and Reactive Services Charges totaling
$67,525.
Dover’s total load was 61,423 MWh versus a forecasted load of 55,324 MWh.
Dover’s planned energy purchase from the SunPark solar installation was 1,151 MWh.
Dover’s actual energy purchase from the SunPark installation was 993 MWh.
1
Página 7
Supply Source Summary:
Supply Variance:
Budget Actual Variance
Gross Load 55,324 61,423 (6,099)
Wholesale Load 54,173 60,430 (6,257)
Hedged Volume (MWh) 27,840 41,760 (13,920)
Unhedged Volume (MWh) 26,333 18,670 7,663
Dover SunPark Volume (MWh) 1,151 993 158
Renewable Energy Credits Volume 173 121 52
Hedged Cost ($/MWh) $ 54.29 $ 47.82 $ 6
Unhedged Energy Cost ($/MWh) $ 42.62 $ 101.27 $ (59)
Solar Energy Cost ($/MWh) $ 87 $ 102 $ (15)
Energy Costs ($/MWh) $49.42 $64.95 ($15.53)
All-in Costs - Energy, Capacity and RECs ($/MWh) $81.18 $92.09 ($10.92)
2
Página 8
B. Generation Summary:
Dover generated 632 MWh in the month. Net generation revenue was $875,148 vs. a
budget of $875,310.
3
Página 9
Generation Breakdown:
City of Dover
Monthly Wholesale Generation
February, 2014
Net Generation for February
632.45
All In Generation
PJM - Generation
Economic and Reliability Dispatch $ 56,438.97
Generation Capacity Credit $ 1,200,500.00
Black Start and Transmission Losses $ 88,522.50
Natural Gas & Oil Consumption
Purchases for Generation $ (80,198.60)
Natural Gas Transport $ (4,855.07)
Eastern Shore Cashout $ 10,810.80
Oil Consumption $ 3,022.97
Production Margin
PJM - Generation
Economic and Reliability Dispatch $ 56,438.97
Natural Gas & Oil Consumption
Purchases for Generation $ (80,198.60)
Natural Gas Transport $ (4,855.07)
Eastern Shore Cashout $ 10,810.80
Oil Consumption $ (3,022.97)
Gross Production Margin $ (20,826.87)
$/MWh Generation Production Gross Margin $ (32.93)
4
Página 10
C. Emissions Summary:
Emissions Allowance Summary through February 28th, 2013
The CAIR units (McKee Run 3 & VanSant) did operate during the month of January, so
there were additional emissions during this period.
CAIR EMISSION ALLOWANCE SUMMARY
SO2 NOx Allowances1
Date Action
Allowances Seasonal Annual
1/1/09 2008 Carryover 3,240 0 0
1/1/09 2009 Allocation 2,723 53 80
2/1/10 2010 Allocation 2,039 50 78
1/1/11 2011 Allocation 1,988 49 78
4/1/11 2011 Reallocation 2 4
1/11/12 2012 Allocation 1,988 51 80
10/4/2012 2013 Allocation 1,988 49 76
2014 Allocation 1,988 49 76
9/29/09 SO2 Sales (1,500)
11/12/09 NOx Ann. Sales (45)
11/13/09 SO2 Sales (1,410)
11/20/09 NOx Seas. Sales (25)
12/31/09 2009 Emissions2 (1) (6) (13)
12/31/10 2010 Emissions 0 (54) (54)
10/31/10 EPA Linearity Testing Req. (68) (68)
2011 2010 Deficit NOx Purchases 53 22
Aug 2011 Revised 2010 ECMPS data 30 30
Nov 2011 NOx Seas. Sales (DEMEC) (1)
12/31/11 2011 Emissions2 (1) (32) (36)
12/31/12 2012 Emissions2 (1) (37) (37)
Nov 2012 NOx Seas. Sales (DEMEC) (2)
2/13/2013 NOx Annual. Sales (DEMEC) (3)
11/15/13 NOx Annual Sales (DEMEC) (5)
12/31/13 C.Y.T.D. 2013 Emissions (0) (20) (20)
2/28/14 2014 YTD Emissions (1.1) (0) (6.4)
REMAINING ALLOWANCES 13,039.9 99 243.6
On August 21, 2012, a three-judge panel of the U.S. District Court of Appeals (DCA) in
Washington vacated EPA’s Cross State Air Pollution Rule (CSAPR) which would have
become effective on January 1, 2012. The DCA instructed EPA to continue
1
Per CAIR, starting in 2009, NOx emissions are governed by a seasonal and annual program.
2
Under CAIR, pre-CAIR SO2 allowances are retired at a rate of 2 allowances for each ton emitted. It is
assumed that pre-CAIR allowances will be retired before CAIR allowances.
5
Página 11
administering the Clean Air Interstate Rule (CAIR). In response to an EPA appeal to the
U.S. Supreme Court, the Supreme Court heard arguments on December 10th, 2013. The
Court did not indicate when it plans to release an opinion in the CSAPR case.
In a related proceeding, at the end of 2013, Governors from eight Northeastern states
petitioned EPA to add nine Southern and Midwestern states to the Ozone Transport
Region (OTR). If the Supreme Court rules against EPA in the CSAPR case, EPA would
need to act on the OTR petition within 18 months of its filing.
Market liquidity for CAIR allowances continues to be low, with few transactions
occurring. The following table shows estimated values for Dover’s banked allowances,
based on broker bids & offers:
Mark-to-Market for CAIR Allowances (3/20/2014)
Commodity $/Ton Tons Extended
(Bid/Offer Avg.) Value
SO2 Allowances (2009 & earlier) $ 1.35 5,089 $ 6,870
SO2 Allowances (2010-13) $ 0.65 7,950.9 5,168
NOx Allowances - Seasonal $18.00 99 1,782
NOx Allowances - Annual $40.00 243.6 9,744
TOTAL $23,564
Regional Greenhouse Gas Initiative
The State of Delaware is a participant in the Regional Greenhouse Gas Initiative (RGGI).
The City of Dover must comply with RGGI by surrendering carbon dioxide (CO2)
allowances pursuant to the State of Delaware’s laws (Title 7, Chapter 60, Sub-Title II-A).
Delaware has elected a combined emissions allowance allocation/auction mechanism for
RGGI, in which 40% of CO2 allowances were allocated to sources for 2009, declining by
8% per year so that by 2014, all CO2 allowances are auctioned.
Dover had more than a sufficient number of RGGI allowances allocated to it to cover its
requirements through the first compliance period (calendar years 2009-2011). Any
unused allowances are carried over (“banked”) for subsequent years. The table below
shows RGGI allowance allocations, deductions and the cumulative balance by year
(column 8).
6
Página 12
CO2 Allowance Summary (2/28/2014)
1 2 3 4 5 6 7 8
CO2 Allowances Annual
CO2 CO2 (Per Facility, Allocated Cumulative
CO2 Tons CO2
Allowance Allowances Prior to Sale) CO2
Vintage Sold YTD Allowances
Emitted Allowance Balance
McKee Balance
VanSant
Run
2009 0 60,128 2,056 62,184 (5,796) 56,388 56,388
2010 0 48,102 1,645 49,747 (32,971) 16,776 73,164
2011 0 36,077 1,234 37,311 (17,763) 19,548 92,712
2012 0 27,058 925 27,983 ( 15,265) 11,793 104,505
3
2013 0 15,032 514 24,818 (10,231) 16,091 119,091
2014 0 -0- -0- -0- (4,458) 114,634
After 2013, Dover no longer receives allocations of RGGI allowances. The Cumulative
Balance (column 8) – aka “Banked Allowances”) can be utilized for generation in 2014
and future years. Once the banked allowances have been fully utilized, Dover will be
required to purchase RGGI allowances through the auctions or through over-the-counter
markets. Assuming that Dover does not sell any banked allowances, it will be able to
maintain a positive balance through 2016–2025, depending on actual annual energy
production in 2012 and beyond.
On February 7, 2013, RGGI proposed changes to its Model Rule. The Delaware
Department of Natural Resources published the final rule on December 1, 2013 the
Delaware Register of Regulations with an effective date of December 11, 20134. NOTE:
The new RGGI rule includes a provision which will eliminate some portion of banked
allowances in future years. TEA will be investigating the potential impact of this
provision on Dover’s RGGI allowance bank.
Dover could elect to sell all or a portion of its banked allowances now and re-acquire
allowances at a later date; however TEA is currently of the opinion that Dover will be
better off retaining its banked allowances for use during future compliance years.
The most recent RGGI auction occurred on March 5th, 2014; the auction cleared at
$4.00/ton. The next auction will occur on June 4th, 2014. RGGI futures settlement
prices posted on Intercontinental Exchange (ICE) on March 20th, 2014 ranged from $4.26
to $4.48/ton, depending settlement month. Based on the March 20th, 2014
3
Includes Q3 2013 allocations of 7,846,757 for McKee Run and 1,424,677 for VanSant.
4
http://regulations.delaware.gov/register/december2013/final/17%20DE%20Reg%20644%2012-01-13.pdf
7
Página 13
Intercontinental Exchange prices for March, 2014 ($4.26/ton), the value of Dover’s
existing 114,634 ton RGGI allowance bank is $488,341.
Renewable Energy Certificates
Dover owns two photovoltaic systems totaling 15 kW, consisting of (one 5 kW unit at the
Utilities Administration Building and two 5 kW units at the McKee Run generating
station. Dover also receives solar energy produced by the 10 MW Dover Sun Park which
is owned by White Oak Solar Energy, LLC. In addition to the all of the physical energy
produced by the Sun Park, Dover receives 15% of Sun Park’s SRECS. Through the end
of January 2014, Dover has accumulated a total of 6,8525 SRECS from these renewable
energy resources.
The nearest viable market for Dover’s SRECs is Pennsylvania. Pennsylvania’s March 3,
2014 SREC auction cleared separately for 2012/2013 through 2013/2014 vintage
allowances. Clearing prices and Dover’s SREC market value estimate are shown in the
table below.
SREC Vintage
Auction Clearing Price SREC Quantity Market Value
(June 1 – May 31)
$ 4.01
2010/2011 13 $ 52
(Aug-13 Auction)
$ 40.01
2011/2012 2,375 95,024
(Jan 2014 Auction)
$55.00
2012/2013 2,725 149,875
(March 2014 Auction)
$55.00
2013/2014 1,739 96,645
(March 2014 Auction)
TOTAL 6,852 $341,596
TEA continues to recommend to Dover to retain these allowances for compliance with its
Renewable Portfolio Standard which DEMEC is working on. Once Dover has an
approved RPS in place, it may be required to retire a portion of its current SREC balance
for compliance in the 2012/13 future compliance year. Any remaining SRECs could be
used for the 2013/14 compliance year.
NOTE: SRECs in both Delaware and Pennsylvania expire without value after 3 years.
Dover currently has thirteen (13) 2010/2011. Based on a recent discussion with DEMEC
staff, this expiration provision is not likely to be of concern within the current compliance
year.
If Dover has not accumulated adequate non-solar RECs, it will need to acquire some
from DEMEC for the 2013/2014 compliance year. DEMEC has told TEA that it will
likely have sufficient non-solar RECs for Dover’s requirements. Dover can purchase and
5
Includes 121 RECs for Sun Park generation in January 2014 which had not been posted to Dover’s PJM
GATS account as of March 24 th, 2014.
8
Página 14
retire a portion of these non-solar RECs during the current compliance and fiscal years,
or it can defer acquisition until the June – August, 2014 time frame, after the exact
amount of non-solar REC requirements is known.
D. Operations Management Summary:
During the month of February there were no reportable or lost time accidents or injuries.
The facility has now gone 1,230 days without an OSHA recordable accident and 1,230
consecutive days without a lost time reportable accident. There were zero Environmental
Notices of Violations issued and there was one opacity deviation on Unit 2 on startup.
There were no Near Miss incidents. In the month of February, Units 1, 2, and 3 were not
dispatched By PJM. Unit 11 was dispatched once by PJM. Capacity tests for Units 1,2,
and 3 were successfully completed.
Monthly Budget Variance – The actual expenses attributable to O&M of the two sites for
the month of February were $390,956 against a budgeted amount of $355,495 for an
unfavorable variance of $35,461 or 9.98%. The principal reasons for the unfavorable
variance were due to unscheduled overtime, higher water, sewer, and electrical costs to
support unscheduled generation. Also contributing to the unfavorable variance was the
timing of insulation repairs which were budgeted later in the year.
E. Risk Management Summary:
Forward power prices in PJM are higher than last month though out the hedging time
horizon.
The current projected cost of service is below:
Blended Cost Monthly Change
PY Hedge Ratio ($/MWh) ($/MWh)
2013-14 78% $ 52.19 $ 0.16
2014-15 65% $ 46.44 $ 0.97
2015-16 46% $ 42.50 $ 0.55
2016-17 18% $ 41.16 $ 0.82
2017-18 10% $ 41.98 $ 1.41
9
Página 15
II. Budget Report
Variance Report:
Budget Actual Variance
Feb-14 Feb-14
Gross Load 55,324 61,423 (6,099)
Power Supply
Hedged Energy $1,511,560 $1,996,784 ($485,224)
PJM - Energy, Congestion & Losses $1,122,370 $1,890,712 ($768,342)
PJM - ARR, Transmission and Fees $395,000 $337,698 $57,302
Dover SUN Park Energy $100,175 $101,681 ($1,506)
Dover SUN Park RECs $25,000 $17,301 $7,699
Management Fees $83,000 $83,000 $0
PJM - Capacity UCAP Obligated Purchased $1,253,880 $1,229,322 $24,558
Subtotal - Power Supply $4,490,985 $5,656,498 ($1,165,513)
Power Generation O&M
Plant O&M $355,770 $390,956 ($35,186)
Subtotal Generation O&M $355,770 $390,956 ($35,186)
Power Generation Production Margin
PJM - Economic and reliability dispatch $0 ($56,439) $56,439
Fixed Fuel and Transport Charges $0 $79,357 ($79,357)
Subtotal Generation Production Margin $0 $ 22,918.05 ($22,918)
Power Generation Non-Production Revenue
PJM - Generation Capacity Credit ($1,200,500) ($1,200,500) $0
Emissions Allowance Sales $0 $0 $0
PJM - Black Start & Transmission Losses ($30,580) ($88,523) $57,943
Subtotal - Non-Production Revenue ($1,231,080) ($1,289,023) $57,943
SubTotal - All Generation (875,310) ($875,148) ($162)
Total - Utilities Cost $3,615,675 $4,781,349 ($1,165,674)
Unit Costs
Total - Power Supply $81.18 $92.09 ($10.92)
Total - Power Generation ($15.82) ($14.25) ($1.57)
Final Cost of Service to City of Dover Ratepayers $65.35 $77.84 ($12.49)
10
Página 16
Variance Analysis:
Power Supply
Dover consumed 6,099 MWh more than forecast for the month.
PJM energy costs were higher than expected as high market prices occurred
during the month driven by the much below normal temperatures. Hedged costs
were higher than forecasted due to an additional layering in of hedges. PJM Fees
were slightly lower than budget.
Hedges were placed at below budget levels, however higher market prices more
than offset this benefit. Higher market prices resulted in a net power supply cost
of $92.09/MWh, $10.92/MWh above budget.
For the month, the city realized an unfavorable variance of $1,165,513 for power
supply vs. the monthly budget.
Dover Sun Park generated 158 MWh less than forecast.
Generation
Power generation had an unfavorable budget variance of $162.
Plant O&M expenses had an unfavorable budget variance of $35,186 for the
month.
11
Página 17
YTD Variance Report:
Budget Actual Variance
YTD YTD
Gross Load 506,540 525,468 (18,928)
Power Supply
Hedged Energy $17,796,306 $20,427,246 ($2,630,940)
PJM - Energy, Congestion & Losses $8,175,287 $13,404,768 ($5,229,481)
PJM - ARR, Transmission and Fees $3,160,000 $5,782,737 ($2,622,737)
Dover SUN Park Energy $873,015 $1,037,904 ($164,889)
Dover SUN Park RECs $200,000 $244,890 ($44,890)
Management Fees $664,000 $664,000 $0
PJM - Capacity UCAP Obligated Purchased $10,881,883 $10,684,245 $197,638
Subtotal - Power Supply $41,750,491 $52,245,790 ($10,495,299)
Power Generation O&M
Plant O&M $3,650,984 $3,598,525 $52,459
Subtotal Generation O&M $3,650,984 $3,598,525 $52,459
Power Generation Production Margin
PJM - Economic and reliability dispatch ($230,472) ($5,371,245) $5,140,774
Fixed Fuel and Transport Charges $0 $2,126,863 ($2,126,863)
Subtotal Generation Production Margin ($230,472) ($3,244,382) $3,013,910
Power Generation Non-Production Revenue
PJM - Generation Capacity Credit ($10,418,625) ($10,418,625) $0
Emissions Allowance Sales $0 $0 $0
PJM - Black Start & Transmission Losses ($274,640) ($940,080) $665,440
Subtotal - Non-Production Revenue ($10,693,265) ($11,358,705) $665,440
SubTotal - All Generation ($7,272,753) ($11,004,561) $3,731,809
Total - Utilities Cost $34,477,738 $41,241,229 ($6,763,490)
Unit Costs
Total - Power Supply $82.42 $99.43 ($17.00)
Total - Power Generation ($14.36) ($20.94) $6.58
Final Cost of Service to City of Dover Ratepayers $68.07 $78.48 ($10.42)
12
Página 18
III. Operations Management
NAES Corporation
Dover, Delaware
February 2014
Monthly Report
New Compliance Coordinator, Mark Gramer
13
Página 19
Table of Contents
1.0 Environmental, Health, and Safety
2.0 Financial
3.0 Operations
4.0 Maintenance
5.0 CIP
6.0 General Plant Information
7.0 Summary of NAES Performance
14
Página 20
1.0 Environmental, Health and Safety:
During the month of February, there were no restricted work days or lost time accidents. The
facility has now gone 3 years and 135 days (1,230 days) through February 28, 2014 without an
OSHA Recordable Accident or a Lost Time reportable accident. There were no Near Miss incidents
during the month.
The plant received no Notice of Violations (NOVs) during the month. The February (January
Discharge) DMR was submitted for the McKee Run site with no NPDES exceedences. There was
one opacity deviation on Unit 2 during unit operations in the month.
During the month of February, there were twelve (12) IWW discharges to the Kent County
Sewer. Sampling was conducted on one of the discharges, as is required by the IWW Permit.
Results have yet to be received. The January SIU Report was submitted to Kent County.
Environmental, Health, and Safety Statistics
Month Fiscal Year to Date
(February) (7/1/13-6/30/14)
NOVs 0 0
Opacity Deviations 1 11
Environmental Deviations 0 0
OSHA Recordable 0 0
OSHA LTA's 0 0
First Aid cases 0 0
Restricted Workday Accident 0 0
Near Miss 0 2
Man Hours Worked 4,234.75 34,231.00
Date last OSHA Recordable 10/14/10
Date last Lost Time Accident 10/14/10
Days since last OSHA recordable 1,230
Days since last Lost Time Accident 1,230
15
Página 21
Emissions (NOx, CO2 & SO2) All data thru 2/28/14
NOx Summary – Ozone Season (May-Sep) Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2011 1.8 1.5 31.4 1.4 36.1
2012 1.2 1.0 35.8 1.0 33.1
2013 1.1 1.7 19.3 1.3 23.4
2014 0.0 0.0 0.0 0.0 0.0
NOx Summary - Year (Jan-Dec) Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2011 1.8 1.5 32.6 2.9 38.8
2012 1.2 1.1 35.8 1.0 36.9
2013 1.1 1.7 19.4 1.3 23.5
2014 0.5 0.5 3.5 2.9 7.4
SO2 Summary - Year (Jan-Dec) Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2011 0.0 0.0 0.1 0.5 0.6
2012 0.0 0.0 0.0 0.1 0.1
2013 0.0 0.0 0.0 0.2 0.2
2014 0.0 0.0 0.5 0.6 1.1
CO2 Allowances Summary
CO2 CO2 CO2 Allowances Available Total CO2 CO2
Allowance Allowances (Per Facility, Prior to Tons Emitted Allowance
Vintage Sold YTD Sale) Balance
McKee Run VanSant
2009 0 60,128 2,056 5,796 56,388
2010 0 48,102 1,645 32,971 16,776
2011 0 36,077 1,234 17,763 19,548
2012 0 27,058 925 15,265 11,793
2013 0 22,879# 1,939# 10,231 14,587
2014 0 0 0 4,458 (4,458)
Total CO2 Allowance Balance 114,634
*Note: CO2 allowance values are provided by the RGGI CO2 Allowance Tracking System.
Note: All emissions (NOx, SO2 and CO2) totals for 2013 are unofficial.
#Note: Additional CO2 Emission Values were added to 2013 balances by RGGI COATS- 7,846.757 for
McKee Run and 1,424.677 for VanSant
16
Página 22
CAIR NOx Allowances Summary*
NOx Allowances
CAIR CAIR NOx Available Total NOx NOx Allowance Balance
CAIR NOx
NOx Allowances (Per Facility, Prior to Tons Emitted
Allowances
Allowance Sold YTD Sale) (Yr/ Season)
Purchased
Vintage McKee McKee
VanSant YTD VanSant
Run McKee Run - Run
(Yr/Season) (Yr/Season)
(Yr/Season) VanSant (Yr/Season)
2010 and
3*** 27/0 0/2
earlier
2011 0 77/48 5/3 33/31– 3/1 0/0 - 0/0 42/10 2/2
2012 2** 75/46 5/3 36/36 – 1/1 0/0 - 0/0 39/10 2/0
2013 5** 77/48 5/3 19/19 – 1/1 0/0 - 0/0 58/24 4/2
2014 0 71/46 5/3 3.5/0 - 2.9/0 0/0 – 0/0 67.5/46 2.1/3
Total NOx Allowance Balance 233.5/90 10.1/9
*Note – Emissions allowances are deducted according to oldest vintage first or unless otherwise directed.
**Note – The facility transferred Ozone Season allowances to a third party.
SO2 Allowances Summary
SO2 Allowances Available Total SO2 Tons
(Per Unit, Prior to Sale & Emitted – SO2 Allowances
SO2 Allowance SO2 Allowances
Reconciliation) U3 and U11 Balance
Vintage Sold - YTD
Unit #3 Unit #11 YTD
2010 and earlier 0 4815 276 0 5089
2011 0 1850 138 1 1988*
2012 0 1850 138 1 1988*
2013 0 1850 138 0 1988*
2014 0 1850 138 1.1 1986.9
Total SO2 Allowance Balance 13,039.9
*Note – Emissions allowances are deducted according to oldest vintage first, unless otherwise directed.
17
Página 23
2.0 Financial
Financial – Current Month
Month – February
Actual Budget Variance
Personnel 252,711 251,265 (1,446)
Materials & Supplies 13,424 11,150 (2,274)
Administrative Expenses 124,821 93,080 (31,741)
Total $390,956 $355,495 ($35,461)
Financial – Fiscal Year to Date
Number of Months – 8
Actual Budget Variance
Personnel 1,980,080 2,195,220 215,140
Materials & Supplies 133,521 169,340 35,819
Administrative Expenses 1,304,959 1,286,904 (18,055)
Total $3,418,560 $3,651,464 $232,904
2.1 Variance analysis:
The actual expenses for the month of February are $390,956 against a budgeted amount
of $355,495 for an unfavorable variance of $35,461 or 9.98%. The variance was due to
the following:
PERSONNEL EXPENSES – An unfavorable monthly variance of $1,446 was due to
unscheduled overtime to support generation unit operations, capacity testing, and
training.
MATERIALS AND SUPPLIES EXPENSES- An unfavorable monthly variance of
$2,274 was due to higher water – sewer costs than anticipated in order to support
generation unit operations.
ADMINISTRATIVE EXPENSES – An unfavorable monthly variance of $31,741 was
due to the timing of invoices for plant wide insulation repairs, unanticipated
environmental costs, and higher than anticipated electricity costs to support generation
unit operations.
The forecasted expenses for this fiscal year are $5,807,568 expensed versus an approved
budget of $6,015,800 thereby realizing a 96.54% expenditure rate.
18
Página 24
3.0 Operations
Unit Operations / Outages / Trips
In the month of February, Units 1, 2, and 3 were not dispatched; Unit 11 was dispatched
once by PJM. The capacity tests for Units 1, 2, and 3 were successfully completed in the
month of February.
Month February 2014
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 4.800 6.750 7.380 18.930 1.116 20.046
Starts # 1 1 1 3 1 4
Gross Generation MWh 57.225 86.008 488.983 632.216 46.050 678.266
Net Generation MWh 55.447 82.026 451.463 588.936 45.969 634.905
Total Auxiliaries MWh 43.031 45.235 225.541 313.807 8.182 321.989
Auxiliaries purchased MWh 41.253 41.253 188.021 270.527 7.372 277.899
Fuel Gas Used MMBTU 837.930 1,015.002 5,765.759 7,618.691 602.888 8,221.579
Fuel Oil Used MMBTU 0.0 0.0 146.715 146.715 0.0 146.715
Fuel Oil Used Gallons 0.0 0.0 1,023 1,023 0.0 1,023
Total Fuel MMBTU 837.930 1,015.002 5,912.474 7,765.406 602.888 8,368.294
Net Heat Rate BTU/KWh 15.112 12.374 13.085 13.523 13.115 13.421
Unit Trips # 0.0 0.0 0.0 0.0 0.0 0.0
Capacity Factor % 0.49 0.72 0.66 0.64 0.17 0.54
Availability Factor % 100.00 100.00 100.00 100.00 100.00 100.00
Commercial
% 0 0 0 0 0 0
Unavailability (CU)
Planned Outage Hours Hours 0.00 0.00 0.00 0.00 0.00 0.00
Maintenance Outage
Hours 0.0 0.0 0.0 0.0 0.0 0.0
Hours
Forced Outage Hours Hours 0.0 0.0 0.0 0.0 0.0 0.0
Reserve Shutdown
Hours 667.200 665.250 664.620 1997.070 670.884 2667.954
Hours
HW Boiler Gas Usage MMBTU 1,239.504 1,239.504
Pilot Gas Usage MMBTU 206.584 268.770 475.354 475.354
# Note: Does not include HWB or Pilot Gas. Fuel usage numbers are taken from fuel flow
instruments.
19
Página 25
2013-2014 Fiscal Year-to-Date - February
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 135.697 214.032 263.041 612.770 75.655 688.425
Starts # 7 7 16 30 20 50
Gross Generation MWh 959.877 1,413.560 16,424.707 18,798.144 2,615.094 21,413.238
Net Generation MWh 895.980 1,309.804 15,045.322 17,251.106 2,613.006 19,864.112
Total Auxiliaries MWh 301.080 406.037 2,759.126 3,466.243 30.863 3,497.106
Auxiliaries purchased MWh 279.806 322.336 1,380.185 1,982.327 28.046 2,010.373
Fuel Gas Used MMBTU 8,924.901 15,004.575 146,255.584 170,185.060 19,584.819 189,769.879
Fuel Oil Used MMBTU 5,504.840 4,463.354 36,178.243 46,146.437 15,380.547 61,526.984
Fuel Oil Used Gallons 38,567 31,228 252,473 322,268 108,053 430,321
Total Fuel MMBTU 14,429.741 19,467.929 182,433.827 216,331.497 34,965.366 251,296.863
Net Heat Rate BTU/KWh 15.641 14.141 12.613 14.131 13.198 13.898
Unit Trips # 1 1 0 2 5 7
Capacity Factor % 0.90 1.32 2.53 2.17 1.15 1.95
Availability Factor % 75.16 76.53 76.53 76.07 76.53 76.19
Commercial
% 0.95 0.04 0.01 0.13 0.0 0.10
Unavailability (CU)
Planned Outage Hours Hours 1,369.000 1,369.000 1,369.000 4,107.000 1,369.000 5,476.000
Maintenance Outage
Hours 0.0 0.0 0.0 0.0 0.0 0.0
Hours
Forced Outage Hours Hours 80.000 0.0 0.0 80.000 0.0 80.000
Reserve Shutdown
Hours 4,248.303 4,213.968 4,203.555 12,665.826 4,388.345 17,054.171
Hours
HW Boiler Gas Usage MMBTU 4,816.127 4,816.127
Pilot Gas Usage MMBTU 2,375.134 4,694.627 7,069.761 7,069.761
Fuel Oil Inventory
Monthly Monthly Fuel Monthly FY 13-14 Fuel FY 13-14
Inventory Inventory Purchases Inventory Inventory Purchases Inventory
(Start) (End) (Month) (Change) (Start) (YTD) (Change)
McKee Run
(#2 Fuel Oil) 267,019 460,013 194,807 192,994 454,725 378,003 5,288
VanSant
72,139 72,224 0 85 146,133 35,000 (73,909)
(#2 Fuel Oil)
Note: As measured by tank level instruments. Tank levels may change due to oil temperature.
VanSant Lifetime through February 2014
Actual Starts Factored Starts Fired Hours
VanSant 1350 2,311.25 4,306.00
Since HGP - Dec 2004 257 643.55 922.42
20
Página 26
Team Report:
Operations personnel continue to support maintenance by working on Preventative
Maintenance (PM) work orders and other work orders that they have the necessary skills
to successfully complete the task. The Operations Department continues to utilize the
Day Shift Workers in both Operations and Maintenance areas to help in maintaining the
plant.
The operators continue to use the Plant Readiness Program for training and refreshing
their plant knowledge on different systems to improve the plant’s reliability. Some of the
training involved promotes teamwork with other staff members to work together to find a
solution and to promote further discussions on equipment operation. The operators also
use the GPi Learning courses to improve their knowledge and skills. The GPI online
training which supports plant safety, OSHA, and environmental training requirements are
being used by the teams to complete their training for the year. Along with the GPI
OSHA training, the operators review the plant’s safety procedures.
Capacity Testing – FY 2013-2014
Summer 2013 (June 1- Aug 31) Winter 2013-2014 (Dec 1- Feb 28)
Unit Rated Net Reported Net Unit Rated Net Reported Net
Capability (MW) Capability (MW) Capability (MW) Capability (MW)
1 17 17.2 1 17 17.5
2 17 17.8 2 17 18.2
3 102 103.0 3 102 104.4
11 39 40.9# 11 39 44.05#
Total 175 178.9 Total 175 184.1
Note: * Denotes Unit is qualified for the PJM Winter Demonstration Period Exemption Program and
data has been submitted into the PJM eGADS
Note: # Depicts Net Corrected Capacity for Ambient Air Conditions – VanSant Unit only
21
Página 27
4.0 Maintenance
During the month of February, the Plant Maintenance staff continued addressing the
backlog of work orders. There were fifty-two work orders issued with ninety-two work
orders being completed during the month. There were no safety work orders entered into
the plant’s Computerized Maintenance Management System (MP2) during the month.
The table below summarizes the monthly work order activities.
Work Order Report
February - 2014
Outstanding
From Outstanding
Previous Issued This Completed at the end of
Priority # Month Month This Month the month
1 20 2 8 14
2 67 9 29 47
3 47 1 12 36
4 6 0 1 5
5 17 0 2 15
SW1 0 0 0 0
SW2 0 0 0 0
SW3 0 0 0 0
SW4 0 0 0 0
SW5 0 0 0 0
PM 72 40 40 72
EM 0 0 0 0
Totals 229 52 92 189
Note: PM Work Orders are included in the priority totals
Notable activities during the month include:
NAES Maintenance Mechanics adjusted Unit 3 cooling tower water distribution flows
across the north and south hot water basins during the capacity testing of Unit 3.
Equalized water distribution ensures proper cooling of the water.
NAES Maintenance Mechanics completed repairs to Units 1 and 2 boiler level sight glass
columns. The sight glasses were identified as having poor visibility of the proper water
levels as observed from the control room during unit operation events. Each sight glass
was disassembled, cleaned and new mica kits installed. Sight glasses operated properly
during subsequent unit operations.
NAES Maintenance Mechanics removed and repaired various steam and water pipes
damaged from extreme weather conditions during the month. The repaired piping was
Unit 2 air preheater drain piping, Unit 3 soot blower steam piping and Unit 1 boiler water
22
Página 28
sample piping to the lab. Each area was removed and replaced with new pipe. No
additional work or leaks were observed during February unit operations.
NAES IC&E Staff completed repairs to one outdoor eyewash unit. During monthly
testing of the eyewash unit, it was discovered that the eyewash water was extremely hot
from piping heat tracing cable. IC&E staff installed a temperature controller to better
control the water temperature during times of operation.
5.0 Capital Improvement Projects (CIP)
Project
Description Update
Number
Progress: Cooling Tower decking is 100% complete.
Unit #3 Cooling
EG1402 Schedule: Remaining inspection work to complete in april-may
Tower Repairs
timeframe.
McKee Run Progress: Work planned for the Fall is 100% complete.
Auxiliary Schedule: Remaining Fall outage items were completed in
EG1404
Component December. Spring activities to start in March.
Replacement
VanSant Station Progress: Work planned for the Fall is 100% complete.
EG1405 Component Schedule: Project activities for this fiscal year have been completed.
Replacement
Progress: The recently completed hanger adjustments will need to
McKee Run HEP be checked with the unit in the hot (running) position.
EG1406
Pipe Repairs Schedule: FAC work inspection vendor selected. Spring work on
schedule to start March 10.
Progress: Proposal received from vendor. COD and plant personnel
have discussed proposal and submitted a list of “to do” items to the
Metering System vendor for more information and clarification.
EG1407
Upgrades Schedule: Work activities are moving forward. Additional questions
have been posed to vendor and work scope is being developed.
Waiting on response from vendor.
Progress: Work is being planned to be completed in the Spring 2014
McKee
outage period. Specifications being written for VanSant breaker
EG1408 Run/VanSant Safety
installation. Will need to go out for bids once complete.
Compliance Items
Schedule: Work activities are behind due to Fall Outage activities.
McKee Run Natural Progress: Work scheduled for the Spring Outage.
EG1409 Gas Block-Bleed Schedule: Work activities are back on track for a Spring Outage
Valves completion date.
McKee Progress: Plant staff completed development of paint specifications
EG1413 and bid requests were received.
Run/VanSant
23
Página 29
Structural Schedule: Bids were received in early September. Work is on hold
Preservation due to budget restraints.
Progress: Repair vendor selected. Consumables parts have been
Unit 3 Turbine
EG1212 received.
Repairs
Schedule: Repair vendor will mobilize March 1
Progress: Cost to be incurred due to repairs on Unit 1 boiler and
McKee Run Units
turbine were completed in November.
EG1415 #1-#2 Component
Schedule: Other scope activities being evaluated due to the
Repairs
announcement to stop operation of units 1 and 2 in 2016.
Progress: Capacity increase request is in the PJM queue. Proposals
have been received and are being evaluated. Met with DNREC to
review the construction permit application. Will submit application
VanSant Capacity in March. Facility impact study results provided by PJM indicate no
EG1416
Increase additional modifications required.
Schedule: Environmental Support contractor is now preparing the
Title V Application Modification that will be submitted to the
DNREC for project approval.
6.0 General Plant Information
The Plant welcomed Mark Gramer as the newly hired Compliance Coordinator on February 19,
2014. Mark brings a wide variety of experience and will be concentrating on learning plant
specific requirements for Environmental and Safety issues.
Training:
Plant employees continue General Physics safety training and environmental courses to
enhance their overall knowledge of permit and safety requirements. As the GPI courses
are being completed, the employee reviews the standard operating procedure (SMP) for
the same topic they are training on to review NAES policy as well.
Topics discussed during the monthly safety committee meeting were reviewed by the
entire staff. The monthly safety topic was on “Take Two For Safety”.
Simulation training for PJM operations is scheduled to occur on April 8-9 by a third party
vendor. Completion of this training enables plant operators to meet Continuing Education
Hours (CEHs) requirements that are part of maintaining their PJM System Ops
Certification.
24
Página 30
Calendar of Events Date
Winter Capacity Period December 1, 2013 to February 28, 2014
EIA-860 Report TBD
EIA-923 Report TBD
NOx Emissions Reconciliation Due March 1, 2014
SO2 Emissions Reconciliation Due March 1, 2014
SARA III / Tier II Report Due March 1, 2014
NPDES Permit Expires (DNREC has Extended) March 4, 2014 (TBD)
Units 1, 2, and 3 Spring Outage March 3, 2014 – May 30, 2014
Unit 11 Spring Outage March 3, 2014 – May 30, 2014
Annual VanSant Black Start Test March, 2014
Air Emission Inventory March , 2014
NOx Ozone Season Starts May 1, 2014
PJM Summer Capacity Test Period June 1, 2014 – August 31, 2014
FY 2013-2014 Budget Year Ends June 30, 2014
Toxic Release Inventory (TRI) Annual Report July 1, 2014
Semi-Annual Title V Certification Due July 31, 2014
NOx Ozone Season Ends September 30, 2014
Units 1, 2, 3 and 11 Fall Outage October 1, 2014
Four Year Accident Free October 14, 2014
Annual Title V Certifications Due January 30, 2015
7.0 Summary of NAES Performance to Date
Plant Performance FY 2013-2014
Measure Month Year to Date YTD FY Maximum
Incentive Incentive
Commercial
0.16% 0.10% $91,087 $94,882
Unavailability (CU)
Safety 0 0 $17,790 $17,790
Environmental 0 0 $17,790 $17,790
Capacity Tests
Summer Winter Summer Winter
Completed
Unit 1 No Yes Yes Yes $3,559 $3,559
Unit 2 No Yes Yes Yes $3,559 $3,559
Unit 3 No Yes Yes Yes $21,349 $21,349
Unit 11 No No Yes Yes $7,117 $7,117
Total YTD
97.71% Total YTD Incentive $162,249 $166,045
Incentive %
Note: All units successfully completed the Summer and Winter Capacity (FY 2013-2104) testing for PJM.
25
Página 31
IV. Appendix 1 – PJM Invoice Breakdown
Gen Load Grand Total
480-8102-592-95-49 Capacity Resource Deficiency ($2,438.98) ($2,438.98)
Capacity Transfer Rights ($17,372.04) ($17,372.04)
Incremental Capacity Transfer Rights ($1,511.33) ($1,511.33)
Locational Reliability $1,250,644.08 $1,250,644.08
480-8102-592-95-50 RPM Auction ($1,200,500.00) ($1,200,500.00)
480-8102-592-95-90 Auction Revenue Rights ($24,135.38) ($24,135.38)
Balancing Operating Reserve $12,786.92 $12,786.92
Balancing Operating Reserve for Load Response ($2.10) ($2.10)
Black Start Service $1,807.59 $1,807.59
CT Lost Opportunity Cost Allocation ($15.68) ($15.68)
Day-Ahead Load Response Charge Allocation $2,047.48 $2,047.48
Day-ahead Operating Reserve $7,185.12 $7,185.12
Day-ahead Operating Reserve for Load Response $120.22 $120.22
Day-ahead Scheduling Reserve $253.40 $253.40
Demand Resource and ILR Compliance Penalty ($1,800.96) ($1,800.96)
Expansion Cost Recovery $405.14 $405.14
FERC Annual Recovery $4,335.35 $4,335.35
Generation Deactivation Refund ($734.39) ($734.39)
Load Management Test Failure ($40.04) ($40.04)
Load Reconciliation for Transmission Losses $926.63 $926.63
Market Monitoring Unit (MMU) Funding $284.38 $284.38
Michigan - Ontario Interface Phase Angle Regulators $178.40 $178.40
Network Integration Transmission Service $292,660.14 $292,660.14
Non-Firm Point-to-Point Transmission Service ($1,256.59) ($1,256.59)
Non-Synchronized Reserve $1,201.68 $1,201.68
North American Electric Reliability Corporation (NERC) $660.83 $660.83
Organization of PJM States, Inc. (OPSI) Funding $43.21 $43.21
PJM Scheduling, System Control and Dispatch Service - Advanced Second Control Center $1,686.33 $1,686.33
PJM Scheduling, System Control and Dispatch Service - Capacity Resource/Obligation Mgmt. $852.60 $852.60
PJM Scheduling, System Control and Dispatch Service - Control Area Administration $10,449.35 $10,449.35
PJM Scheduling, System Control and Dispatch Service - Market Support $2,399.12 $2,399.12
PJM Scheduling, System Control and Dispatch Service - Market Support Offset ($330.65) ($330.65)
PJM Scheduling, System Control and Dispatch Service - Regulation Market Administration $75.73 $75.73
PJM Scheduling, System Control and Dispatch Service Refund - Capacity Resource/Obligation Mgmt. ($113.40) ($113.40)
PJM Scheduling, System Control and Dispatch Service Refund - Control Area Administration ($1,562.48) ($1,562.48)
PJM Scheduling, System Control and Dispatch Service Refund - Market Support ($362.34) ($362.34)
PJM Scheduling, System Control and Dispatch Service Refund - Regulation Market Administration ($14.12) ($14.12)
PJM Settlement, Inc. $330.65 $330.65
Reactive Services ($67,525.52) ($67,525.52)
Reactive Supply and Voltage Control from Generation and Other Sources Service $34,852.13 $34,852.13
Real-Time Load Response Charge Allocation $1,511.75 $1,511.75
Regulation and Frequency Response Service $25,494.49 $25,494.49
Reliability First Corporation (RFC) $938.72 $938.72
Synchronized Reserve $17,617.76 $17,617.76
Transmission Enhancement $9,897.89 $9,897.89
Transmission Owner Scheduling, System Control and Dispatch Service $4,588.58 $4,588.58
480-8102-592-95-91 Balancing Spot Market Energy $464,196.64 $464,196.64
Balancing Transmission Congestion $49,283.75 $49,283.75
Balancing Transmission Losses $28,264.36 $28,264.36
Day-ahead Spot Market Energy $992,520.26 $992,520.26
Day-ahead Transmission Congestion $300,952.38 $300,952.38
Day-ahead Transmission Losses $157,776.37 $157,776.37
Emergency Load Response $302.79 $302.79
Inadvertent Interchange ($2,621.22) ($2,621.22)
Load Reconciliation for Balancing Operating Reserve ($343.42) ($343.42)
Load Reconciliation for Day-ahead Scheduling Reserve ($1.26) ($1.26)
Load Reconciliation for FERC Annual Recovery ($115.16) ($115.16)
Load Reconciliation for Inadvertent Interchange $41.30 $41.30
Load Reconciliation for Market Monitoring Unit (MMU) Funding ($7.41) ($7.41)
Load Reconciliation for Non-Synchronized Reserve ($2.48) ($2.48)
Load Reconciliation for North American Electric Reliability Corporation (NERC) ($19.35) ($19.35)
Load Reconciliation for Organization of PJM States, Inc. (OPSI) Funding ($1.34) ($1.34)
Load Reconciliation for PJM Scheduling, System Control and Dispatch Service ($399.66) ($399.66)
Load Reconciliation for PJM Scheduling, System Control and Dispatch Service Refund $110.90 $110.90
Load Reconciliation for Reactive Services ($5,271.24) ($5,271.24)
Load Reconciliation for Regulation and Frequency Response Service ($323.77) ($323.77)
Load Reconciliation for Reliability First Corporation (RFC) ($27.68) ($27.68)
Load Reconciliation for Schedule 9-6 - Advanced Second Control Center ($43.31) ($43.31)
Load Reconciliation for Spot Market Energy ($75,632.06) ($75,632.06)
Load Reconciliation for Synchronized Reserve ($157.72) ($157.72)
Load Reconciliation for Transmission Congestion ($2,558.48) ($2,558.48)
Load Reconciliation for Transmission Losses ($4,571.02) ($4,571.02)
Load Reconciliation for Transmission Owner Scheduling, System Control and Dispatch Service ($143.80) ($143.80)
Meter Error Correction ($10,496.15) ($10,496.15)
480-8102-592-95-92 Balancing Operating Reserve ($14,781.63) ($14,781.63)
Balancing Spot Market Energy ($39,876.85) ($39,876.85)
Balancing Transmission Congestion ($1,549.56) ($1,549.56)
Balancing Transmission Losses ($230.93) ($230.93)
480-8102-592-95-93 Reactive Supply and Voltage Control from Generation and Other Sources Service ($29,467.58) ($29,467.58)
Synchronized Reserve ($3,197.85) ($3,197.85)
Transmission Losses ($55,857.07) ($55,857.07)
Grand Total $ (1,345,461.47) $ 3,457,731.89 $2,112,270.42
26
Página 32
City of Dov er
Electric Rev enue Fund
FY14 - White Oak Solar Park Incremental Cost
Original
July August September October November December January February YTD Budget
Power Supply & Generation
Dover Sun Park - Energy $ 187,421 $ 176,372 $ 204,852 $ 120,839 $ 99,447 $ 64,684 $ 82,605 $ 101,681 $ 1,037,902 $ 1,565,800
Dover Sun Park - REC's 43,005 38,516 42,894 25,307 20,875 13,583 17,301 - 201,481 300,000
Total Power Supply Cost 230,426 214,888 247,746 146,146 120,322 78,267 99,906 101,681 1,239,383 1,865,800
Non-Solar Power Supply Cost (180,227) (154,545) (154,590) (100,770) (79,066) (52,006) (146,406) (91,259) (958,868) (898,706)
Incremental Energy Cost $ 50,199 $ 60,343 $ 93,156 $ 45,376 $ 41,256 $ 26,261 $ (46,500) $ 10,423 $ 280,515 $ 967,094
Revenues
Customer Sales - Electricity (9,404) (7,389) (7,538) (7,662) (7,721) (7,662) (7,907) (7,950) (63,233) (26,300)
Rent Receipts (14,446) - - (14,446) - - (14,807) - (43,699) (58,300)
Total Revenues (23,850) (7,389) (7,538) (22,108) (7,721) (7,662) (22,714) (7,950) (106,932) (84,600)
Incremental Sun Park Cost $ 26,349 $ 52,954 $ 85,618 $ 23,268 $ 33,535 $ 18,599 $ (69,214) $ 2,473 $ 173,582 $ 882,494
MWh Purchased/Generated - Solar 2,052.584 1,815.656 2,000.128 1,179.844 970.972 631.556 806.536 992.788 10,450.064 18,159.000
MWh $ Solar Energy $ 91.31 $ 97.14 $ 102.42 $ 102.42 $ 102.42 $ 102.42 $ 102.42 $ 102.42 $ 99.32 $ 86.23
Solar REC's MWh 307.000 272.000 300.000 177.000 146.000 95.000 121.000 - 1,418.000
MWh $ Solar REC (one month lag)* $ 140.08 $ 141.60 142.98 142.98 142.98 142.98 142.98 $ - $ 142.09
MWh $ Non-Solar Energy $ 87.81 $ 85.12 $ 77.29 $ 85.41 $ 81.43 $ 82.35 $ 181.52 $ 91.92
Note: Solar REC's are one month behind due to the time the invoice is received.