UTILITY COMMITTEE
The Utility Committee Meeting was held on February 10, 2014 at 5:30 p.m. with
Chairwoman Williams presiding. Members present were Mr. Perza and Mr. Blakeman. Mr. Slavin
and Mr. Snaman were absent. Members of Council present were Mr. Dixon (arrived at 5:31 p.m.) and
Mr. Hutchison. Mayor Carey was also present.
AGENDA ADDITIONS/DELETIONS
Mr. Blakeman moved for approval of the agenda as presented, seconded by Mr. Perza and
unanimously carried.
McKee Run Units 1 and 2 - 2017-2018 Capacity Auction
In a letter dated February 7, 2014, Mr. Kirk Betts, Betts & Holt LLC, Energy Attorney for the City,
requested an opportunity to present a recommendation to the Utility Committee regarding McKee
Units 1 and 2. Members were reminded that they, along with City Council, were provided a report
last year explaining how the capacity value of these units compared to the PJM capacity auction
prices on the Delmarva Peninsula would become negative within several years. Mr. Betts explained
that the decision about the future of these units also affects power supply negotiations and plant
operating contract negotiations, both of which have been given a high priority. In addition, he noted
that there is a matter involving a request for waiver with respect to a notice that was not provided
to PJM in December.
Members were reminded that during their Regular Meeting of December 9, 2013, City Council
approved of the Committee’s recommendations of November 25, 2013, that, for the short term, Units
1 and 2 not be offered into PJM's capacity auction for the 2017/18 delivery year; that a
comprehensive analysis be performed that lays out all the decision options for the City of Dover; that
a similar analysis on other parts of the generation portfolio be completed; and that all supply options
be surveyed, including new generation projects in and around Dover and Power Purchase Agreement
(PPA) opportunities.
Mr. Betts indicated that the City of Dover is reviewing several activities related to its power supply,
such as the Purchase Power Agreement with Calpine and the renegotiation of the North American
Energy Services (NAES) contract. He stated that when the Cost/Benefit Analysis for McKee Run
Units 1 and 2 was presented to members, it was recommended that the units be shutdown due to
operation costs and capital improvements ($1.7M between now and 2017 and an additional estimated
$2.4M). He reminded members that there was an outage on the Unit last summer which resulted in
a penalty for the City. Although The Energy Authority (TEA) had recommended an evaluation of
the units, he noted that the strongest recommendation was to prepare to close the units and not bid
them into the market. No action regarding this specific recommendation was taken when considered
by the Committee in November 2013 or City Council in December 2013. The City’s membership
in the PJM requires that the City provide notice three (3) years in advance as to whether or not the
City will bid the units into the market; therefore, the City was required to provide notice regarding
2017/2018 in December 2013. He assured members that TEA has been working on obtaining a
waiver on the notification requirement; however, if the City is not granted a waiver, the City cannot
bid the Unit in and can only get what would be provided in the market place. He noted that in
reviewing the 2016/2017 period, those units are not economic and according to TEA analysis, once
the City begins making capital investments, in order to recover the costs to the Unit over the next
Página 2
UTILITY COMMITTEE MEETING FEBRUARY 10, 2014 PAGE 2
five (5) years, the capacity costs for this zone would need to be $311 per megawatt day. He
explained that the capacity rate for 2015/2016 is $110 per megawatt day and with construction of
the facility at Garrison, the rate is expected to stay suppressed and could potentially go lower. In this
case, the City would have two (2) 16 megawatt units losing money for the City at $200 per megawatt
day rather than providing the City money, as they have in the past, to help subsidize the costs of
these units.
Mr. Betts explained that the theory for all the City’s capacity payments, the fixed ability to generate
at any hour called on, is that it is the money that has been used to pay the NAES Operating
Agreement and also to contribute to the overall cost of operations for the City’s customer. When
this number goes negative, he stated that the City pays money to maintain a facility; therefore, the
long term question is if the City should be putting money into two (2) 16 megawatt units that are
very manually driven, very intensive for operating, and that are 50 years old. As a result, the City
must decide whether to maintain Units 1 and 2.
Mr. Betts stated that his request for bringing this issue before members at this time is due to his
responsibilities to negotiate the Calpine contract and the NAES Contract since he does not know
what to negotiate on the City’s behalf without knowing how many megawatts are needed. If the City
plans to maintain the 16 megawatt units and make the investments on Units 1 and 2, then he would
not need to negotiate capacity, the City would just be in the market looking for energy, and the
Calpine contract may or may not have any value. Referring to the NAES contract, he stated that
there are implications for what the overall costs of operating the facility should be, explaining that
if the units are maintained, there would be a certain amount of labor and other maintenance costs
over the term of the contract and if those two (2) units are removed, there would be a reduction in
maintenance costs. He reminded members that the maintenance costs alone are anticipated to be a
minimum of $1.7M over the next several years, in addition to manpower and other operating
expenses as well as other ancillary charges under the contract based upon the whole contract price.
He stated that it would also affect the bonus provisions since the contract provides for a bonus of
20% of a fee based upon all those units dispatching.
Mr. Betts strongly recommended that the committee make the decision to close Units 1 and 2. He
stated that the City has the option to close the units sooner or later and can always replace the
capacity at a reasonable cost, explaining that the City is committed through 2016 to maintain the
units or find replacement capacity. Part of his responsibility, on behalf of the City, would be to
negotiate a contract that is comparable and would keep the City “in the money” in lieu of expending
the money that would otherwise be spent on the units, which may allow the City to take the capacity
contract earlier rather than 2017/2018. He assured members that capacity and energy are available
and that Units 1 and 2 are becoming very costly. Based on all the recommendations and current
contract negotiations, he felt confident that the City should make a firm decision on the termination
of Units 1 and 2.
In response to Mr. Perza, Mr. Betts indicated that there is capacity in the market place that can be
purchased. He reminded members that when the City negotiated the Option Agreement for the land
and the development at Garrison, one (1) of the items the City negotiated was an option to take 50
megawatts of that facility. Under this Option Agreement, there was a formula established that
Página 3
UTILITY COMMITTEE MEETING FEBRUARY 10, 2014 PAGE 3
provided that the capacity payment should be equal to the actual cost of that unit. He informed
members that the cost, as well as how to benchmark the cost against the market price for capacity,
are still under negotiation to develop an appropriate price to recommend to the City.
Mr. Betts explained that this matter is not an “apples to apples” comparison between market capacity
or a new unit and Units 1 and 2. He is mostly concerned with the City putting money into Units 1
and 2 and still not having the reliability desired. Reliability is critical for two (2) reasons: 1) the
City pays a substantial amount of money to maintain Units 1 and 2; and 2) if Units 1 and 2 are not
reliable and do not dispatch on signal from PJM, the City takes a forced outage, which results in a
penalty and causes a higher reserve margin to be assigned, both of which are very costly.
Providing an explanation of a reserve margin, Mr. Betts stated that there is an assumption that a
certain number of plants are going to fail and that there is flexibility in how much is actually
demanded in the market. Noting that PJM has units all over the country, he stated that there is a
percentage (14%-15%) over and above what is actually purchased; therefore, if 100 megawatts are
purchased, 115 megawatts are the amount actually paid for in order to cover the reserve. He
indicated that the City now has 175 megawatts of capacity and that, according to TEA, the City is
buying 2.4-2.5 additional; however, the actual peak demand is substantially below the 175
megawatts at approximately 160 megawatts. Therefore, the additional megawatts are the reserve the
City must have and maintain or purchase in the market place. If there is a failure in the dispatch,
there would be a penalty and the amount of capacity the City has to buy is increased. This would
require the City to purchase extra reliability due to its own failure. The goal would be to bring that
amount down to what would be reasonable and consistent with the market place. However, he
explained that the main goal is for the City to maintain reliability at a high level, noting that the
City’s customers and PJM expect 100% reliability.
In response to Mr. Blakeman, Mr. Betts stated that when the City entered into the last contract with
NAES and PACE, there was an assumption that Units 1 and 2 would be taken out of service three (3)
to four (4) years into the contract, and the City is well beyond that time frame now. Even though
there has been an estimate of $2.4M for opening up Units 1 and 2, he stressed that there is no
guarantee there will not be additional expenses, particularly since these units have not been opened
for several years. The borescope device can only access a certain number of blades, and the blades
that have been inspected indicate wear; therefore, the assumption is that more than likely there is
wear on the larger blades that they do not see, and when the units are opened, it will cost more to
repair the unit. He stated that Council has delayed opening the unit for review until FY 2017 in order
to save money while considering whether or not to close Units 1 and 2. If the units are opened in
FY 2017 and it is determined that there is a $5M expense rather than the $2.4M expense that was
originally anticipated, he questioned what the City would have gained, noting that the City would
probably have committed out another two (2) to three (3) years by that time.
Mr. Betts reiterated that now is the right time for the City to make a decision with regard to McKee
Run Units 1 and 2 because there is a serious question about their reliability. Although the NAES
Contract provides rewards, there are not substantial penalties for the failure of those units, since the
City takes the penalty. At the request of Mrs. Williams, Mr. Betts stated that he would forward the
performance percentage and dollar amount specifics of the NAES Contract to members.
Página 4
UTILITY COMMITTEE MEETING FEBRUARY 10, 2014 PAGE 4
Responding to Mr. Hutchison, Mr. Betts explained that PJM operates, technically, as a non-profit
facilitator of energy and transmission management for this region and the City pays annual dues as
a member. Regarding the City’s Budget, Mrs. Donna Mitchell, Controller/Treasurer, stated that the
CIP includes $1.7M for Units 1 and 2 and an additional $2.4M for FY 2017/2018 to open up these
units for re-evaluation. Mr. Betts stated that the total budget costs of $4.1M is a low estimate.
In response to Mrs. Williams and Mr. Blakeman, Mr. Betts indicated that if the City chose to
decommission both Units 1 and 2, the $2.4M expense for FY 2017/2018 would be eliminated;
however, the City would need to obtain replacement capacity and, depending on how quickly the
City is able to find replacement capacity, could avoid expending some of the $1.7M to maintain the
units.
Responding to Mrs. Williams, Mr. Betts stated that the City continues to study the VanSant Unit and
that it has been determined that Unit 3 is fine but it is at capacity. Regarding the VanSant Unit,
Mrs. Mitchell stated that the City currently has McHale, the company that previously conducted the
analysis on the increase of capacity, re-reviewing the Unit and they have obtained bids and are
running the number to determine whether the capacity can be increased. They are not guaranteeing
the capacity that the City was hoping for (6 megawatts), feeling that there may be 5 megawatts. The
current capacity is 39 megawatts. Mr. Betts indicated that the VanSant Unit is the most dispatched
unit for the City because it comes up, serves as a “peaker”, is a short-term unit that can come up for
emergencies, etc. One of the challenges for this Unit is the moving target on what PJM gives for the
value on a megawatt day for capacity. He explained that if the City invests a certain amount of
money, there is a certain return needed on the Unit, and the PJM capacity costs are declining, which
is why they are re-reviewing the analysis to make sure the City’s investment is fully returned.
In regard to the questions of Mrs. Williams, Mr. Betts stated that one (1) of the creative ideas that
has been discussed is whether there is value in the market place for the capacity for Units 1 and 2,
and the possibility of giving someone else the rights to the capacity. If there is someone that is
interested in the 32 megawatts that is located in the area, where there are transmission constraints,
there may be real value to swap those megawatts. In addition, he stated that there should be
consideration to the emissions credits, explaining that if it is decided to take the units out and they
are not replaced, the City may be able to sell those emissions credits forward for a number of years.
He noted that emissions credits have been sold in the past based on the way the units operate.
Therefore, he explained that there are potential revenue opportunities with the decommissioning of
the units.
Mr. Betts referred to the SOx and NOx and indicated that there was a recent EPA issuance specifying
what determines what a plant should be able to dispatch out for coal and are reviewing all fossil fuel
plants. As discovered several years ago, he reminded members that with older units, if any
improvements are made to them, there is a risk that the new regulations will become applicable,
which he did not believe had been calculated into what may happen with Units 1 and 2. He stressed
that it would be difficult to make Units 1 and 2 compliant, particularly since they are burning #2 oil.
Página 5
UTILITY COMMITTEE MEETING FEBRUARY 10, 2014 PAGE 5
Mrs. Mitchell informed members that the current five-year CIP would change because the
maintenance over the next three (3) years for Units 1 and 2 may change; for example, a borescope
was going to be performed this year in the spring; however, if the units are decommissioned, that
work will not be performed and the entire CIP will need to be reworked.
Mr. Perza questioned if shutting down Units 1 and 2 would create a leverage problem for
negotiations for replacing the capacity. Responding, Mr. Betts stated that he had considered this
issue and, as a negotiator, there is a certain balance to be maintained. He explained that the first
question for him is how much capacity he needs to negotiate for on behalf of the City. Currently,
the City does not need additional capacity, so unless a decision is made regarding Units 1 and 2, he
has no direction for negotiating on behalf of the City. In addition, he stated that if the units were
very efficient and competitive under PJM, there would be an entirely different type of discussion
taking place at this time. He indicated that efficiency is measured by “heat rate” and that, as an
example, the heat rate on the Garrison Unit (which is seen throughout PJM) is 6,800, which is really
low. Units 1 and 2 are within the 1,200 - 1,300 range, which means the Garrison Unit is twice as
efficient because it burns half as much gas to generate the same amount of electricity as Units 1
and 2.
Mr. Blakeman moved to recommend terminating Units 1 and 2, as recommended by
Mr. Kirk Betts, Energy Attorney for the City, seconded by Mr. Perza and unanimously
carried. (City Clerk’s Office Note: Due to time constraints, this item was placed on the Council
agenda for the meeting being held later in the evening.)
Dedication of Water and Wastewater Infrastructure - The Grande
Members reviewed a request of Doveview Investors, LLC, the responsible party for completing the
water and wastewater infrastructure within the Grande Apartment Complex, for all water and
wastewater infrastructure within the public utility easement to be dedicated to the City of Dover for
permanent ownership and maintenance, including a list outlining the entire water and wastewater
infrastructure associated with this complex. The total construction value of the infrastructure is
$130,620.
Mr. Scott Koenig, City Manager, assured members that Doveview Investors, LLC completed
construction of the infrastructure in accordance with City standards and specifications. After
construction was completed, City staff inspected the water and wastewater infrastructure and
developed a list of repairs to be made to meet the City of Dover Standards and Specifications for
Public Works Construction. All work required by the Public Works Director has been completed
and a one (1) year Maintenance Agreement and a Release of Liabilities will be submitted as part of
the dedication process. The required as-built drawings of the infrastructure as well as videos of the
sanitary sewer mains have been provided to staff.
Staff recommended acceptance of the dedication of water and wastewater infrastructure within the
public utility easement in The Grande Apartment Complex, to include all of the referenced water and
wastewater infrastructure.
Página 6
UTILITY COMMITTEE MEETING FEBRUARY 10, 2014 PAGE 6
Mr. Perza moved to recommend approval of staff’s recommendation for the acceptance of the
dedication of water and wastewater infrastructure within the public utility easement in The
Grande Apartment Complex, to include all of the referenced water and wastewater
infrastructure. The motion was seconded by Mr. Blakeman and unanimously carried.
Dedication of Rights-of-Way and Public Infrastructure - Farthing Woods
Members reviewed a request of Ashburn Homes, Inc., the responsible party for completing the public
infrastructure within the Farthing Woods Subdivision, for all public infrastructure improvements to
be dedicated to the City of Dover for permanent ownership and maintenance, including a list
outlining all of the public improvements associated with this development. The total construction
value of the infrastructure is $261,262.
Mr. Scott Koenig, City Manager, assured members that Ashburn Homes, Inc. completed construction
of the improvements in accordance with City standards and specifications. After construction was
completed, City staff inspected the public improvements and developed a list of repairs to be made
to meet the City of Dover Standards and Specifications for Public Works Construction. All work
required by the Public Works Director has been completed. He indicated that a one (1) year
Maintenance Agreement and a Release of Liabilities will be submitted as part of the dedication
process. Required as-built drawings of the infrastructure as well as videos of the sanitary sewer
mains have been provided to staff.
Staff recommended acceptance of the dedication of rights-of-way and public infrastructure in the
Farthing Woods Subdivision to include all of the referenced public improvements.
Responding to Mr. Perza, Mr. Koenig stated that there are three (3) lots that remain undeveloped
within the Subdivision. He explained that 80% of the development must be completed prior to the
City’s acceptance of the dedication.
Mr. Perza moved to recommend approval of staff’s recommendation for the acceptance of the
dedication of rights-of-way and public infrastructure in the Farthing Woods Subdivision to
include all of the referenced public improvements. The motion was seconded by
Mr. Blakeman and unanimously carried.
Quarterly Review of Utility Related Capital Investment Plan (CIP) (Electric and
Water/Wastewater)
Mr. Scott Koenig, City Manager, reviewed the Capital Investment Plan Project Tracking Report, as
of December 31, 2013, noting that the spreadsheet for the Electric Improvement & Extension Fund
- Major CIP Projects was inadvertently omitted from the packet and would be provided to members
following the meeting (Attachment #1).
Mr. Koenig stated that several of the projects have progressed since December 31, 2013. He noted
that the New Library Project is still listed because the City has not made final payments since there
are still some close out items associated with the Library, and the Roof Replacement Project for
Dover Park is on hold since discussion related to the demolition of the structure has been ongoing.
The Annual Contribution to Robbins Hose is a standard item which is paid out of the Capital Fund.
Página 7
UTILITY COMMITTEE MEETING FEBRUARY 10, 2014 PAGE 7
Project ST1404, for the completion of the streets in the Village of Westover IV, has been completed
since December 31, 2013.
Mr. Koenig noted that several of the projects listed on the Community Transportation & General
Fund Street Funds - Major CIP Projects have been completed but that the City is awaiting final
billing. Referring to the Water/Wastewater Improvement & Extension Fund - Major CIP Projects,
he stated that there have been some changes based on the approvals of Garrison. In addition, he
noted that the City is still working on alternative sites for the 1M gallon elevated water storage
facility off of Denneys Road. He stated that the Piney Point Well is actually in the final phases and
the project was extended to March 1, 2014 for final testing. Although the well, several control
systems, and standby generator are in place, there are some minor items which need to be completed
in order to obtain final authorization from DNREC to put the project into the system.
With reference to the Tar Ditch Interceptor Upgrade, Mr. Koenig stated that since the City has
additional engineers on staff, final easements will be obtained from surrounding property owners.
He noted that the Garrison improvements are identified; however, the report reflects the old budgets,
and has not been updated to include the most recent approvals by City Council. He advised members
that further work has been completed on several of the wastewater projects and assured members that
these information would be reflected on the next quarterly report.
No further action was taken by the committee.
TEA/NAES Report (December)
The TEA/NAES Monthly Report for December 2013 was provided to members to enable them to
monitor electric sales and revenues received, which will provide a better understanding of any
fluctuations that occur and allow the opportunity to make improvements if deemed necessary.
Mr. Koenig noted that the overall power supply costs were $258,397 over budget due to higher load
and reactive services costs and that staff was continuing to monitor these costs. Referring to the
Supply Variance, he explained that the actual Gross Load of 61,756 was higher than the budgeted
amount because the actual power demand in the City has been slightly higher than originally
anticipated. Mr. Koenig stated that YTD Variance Report indicated that the total utilities cost was
approximately $600,000 over budget as a result of the reactive services charges, which, as explained
during the Committee meeting of January 27, 2014, staff hopes will be closer to the budgeted amount
for the remainder of the year. He noted that the City did run during the month of January, due to the
colder temperatures; however, the City was buying the unhedged portion of the portfolio in the
market and the costs were very high.
In response to Mrs. Williams, Mr. Scott Koenig, City Manager, indicated that the City’s portfolio
is 80% hedged; therefore, the City purchases approximately 20% on the market. As a result, when
the prices increase, the City is subject to that portion of the market and when there is a decrease in
the prices, the City benefits. He confirmed that the prices were very high during the recent extreme
cold weather and that the system was constrained.
Mr. Blakeman moved to recommend acceptance of the TEA/NAES Monthly Report for
December 2013, seconded by Mr. Perza and unanimously carried.
Página 8
UTILITY COMMITTEE MEETING FEBRUARY 10, 2014 PAGE 8
UPDATES
Members were provided the following updates:
Green Energy Funding and Programming
Mr. Scott Koenig, City Manager, reviewed details regarding the Green Energy Funding and
Programming.
Mr. Koenig reminded members that, during the Utility Committee meeting held on
November 12, 2013, members reviewed a request from the Presbyterian Church of Dover (the
Church) to consider a change in tariff language to have the wording “or have instrument rated
metering” removed from the C/C1 (Small Commercial) classification description, and staff
committed to working with the Church to provide assistance with a Green Energy Grant Application
to facilitate energy efficiency within the City’s electric system. He advised members that the grant
for the Church had been processed and the Church was able to replace its meter and change
classification.
National Pollution Discharge Elimination System (NPDES) Municipal Separate Storm Sewer
Systems (MS4) Permit
Mr. Scott Koenig, City Manager, advised members that the City continues to operate under an
expired National Pollution Discharge Elimination System (NPDES) Municipal Separate Storm
Sewer Systems (MS4) Permit. The City is anticipating that the State will be issuing a Permit later
in 2014 and that it will be more of a State-wide permit, which will provide for equal treatment and
an expected level of compliance. He stated that additional information will be presented to members
in the next few months as the City receives the permits and conditions presented.
Garrison Oak Technical Park Project Updates
Mr. Scott Koenig, City Manager, provided an update regarding the Garrison Oak Technical Park
Project, as follows:
City Infrastructure
Mr. Koenig stated that during the Council meeting of January 27, 2014, a number of construction
contracts were approved and there will be additional items presented to Council related to the
adjustment of the pole line for the 69kV transmission and some final changes to the Engineering
Services Agreement. He indicated that the administrative site plan for the water tower was
submitted and construction is anticipated to begin once the weather improves. He stated that staff
is working to get both the pump station and the general development contracts for the balance of the
park signed and that construction meetings will be scheduled soon so that work can begin once
weather improves.
Mr. Koenig advised members that the Uzin Utz facility is finalizing their designs, permitting,
contracts, etc. and anticipates beginning work in the spring. All projects are converging on a early
2015 completion; therefore, he stated that there will be a substantial amount of work being done at
the Park.
Mr. Koenig stated that Mr. Bill Neaton, Economic Development Director, has begun to focus his
attention on marketing the remainder of the lots at the Park.
Página 9
UTILITY COMMITTEE MEETING FEBRUARY 10, 2014 PAGE 9
Calpine Energy Center
Mr. Koenig stated that once the weather improves, he will be scheduling tours of the Calpine facility
and as construction progresses staff will be providing updates and tours. He stated that the Calpine
facility is anticipated to be complete in June 2015; however, since testing is scheduled to take place
early in 2015, he felt that it may be completed by late 2014/early 2015.
In response to Mr. Blakeman, Mr. Koenig stated that he had selected a candidate for the Electric
Director position and was at the point of making an offer but was unable to move forward; therefore,
he will begin the process again.
Dover Sun Park
Mr. Koenig reviewed information regarding the Electric Revenue Fund FY14 - White Oak Solar
Park Incremental Cost, noting that the incremental Sun Park costs was $226,600 as of
December 31, 2013. He assured members that the solar park is meeting the City’s green energy
portfolio demands and while it is slightly more costly then regular energy, it is performing as
expected.
Mr. Blakeman moved for adjournment, seconded by Mr. Perza and unanimously carried.
Meeting Adjourned at 6:21 p.m.
Beverly C. Williams
Chairwoman
BCW/TM/dd/js
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Minutes\2014\02-10-2014 UTILITY.wpd
Attachment
Attachment #1 - Quarterly Report - Electric Improvement & Extension Fund - Major CIP Projects
Página 10
ATTACHMENT #1
Utility Committee Meeting of 02-10-2014
City of Dover
Electric Improvement & Extension Fund - Major CIP Projects
Quarterly Report as of December 31, 2013
TOTAL PROJECT - PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR
Original Latest Project Project % Current Revised Fiscal %
Project Project Project To Date Budget Budget Fiscal Year Fiscal Year YTD Budget Budget
Code Type Description Budget Budget Expenses Balance Spent Budget Budget Expenses Balance Spent Status Comments
1 FY2012
2 EG1212 M Unit 3 Turbine Inspection/Repair $ 1,494,000 $ 1,653,536 $ 518,643 $ 1,134,893 31.4% $ 1,149,800 $ 1,149,800 $ 14,907 $ 1,134,893 1.3% In process Will complete Spring outage
3 EG1214 M Industrial WW Discharge System 272,000 272,000 283,767 (11,767) 104.3% - 8,000 9,418 (1,418) 117.7% Complete Expenses are a 100%
4 Total $ 1,766,000 $ 1,925,536 $ 802,410 $ 1,123,126 41.7% $ 1,149,800 $ 1,157,800 $ 24,325 $ 1,133,475 2.1%
5
6 FY 2013
7 EE1308 M Horsepond Substation Upgrade $ 761,800 $ 761,800 $ 346,896 $ 414,904 45.5% $ 591,800 $ 730,900 $ 316,046 $ 414,854 43.2% In process Under Construction
8 EE1312 M General Scott Switchgear 1,155,000 1,150,000 2,851 1,147,150 0.2% 800,000 850,000 2,851 847,150 0.3% In process Under Design
9 EE1314 Capitol Park Upgrade - 248,000 320,423 (72,423) 129.2% 248,000 248,000 220,551 27,449 88.9% In process Under Construction
10 EE1330 Morris Estates 1 Upgrade - 32,600 249,722 (217,122) 766.0% - 32,600 7,322 25,278 22.5% In process Under Construction
11 EG1312 Generator Repairs - 4,200 - 4,200 0.0% - 4,200 - 4,200 0.0% Complete Expenses are a 100%
12 $ 1,916,800 $ 2,196,600 $ 919,892 $ 1,276,708 41.9% $ 1,639,800 $ 1,865,700 $ 546,770 $ 1,318,930 29.3%
13
14 FY 2014
15 --- Vehicles & Equipment $ 660,000 $ 704,600 $ - $ 704,600 0.0% $ 660,000 $ 704,600 $ - $ 704,600 0.0% In Process Ordered
16 EE1401 Air Condition Replacement Monitors 12,000 12,000 - 12,000 0.0% 12,000 12,000 - 12,000 0.0%
17 EE1402 Substation Battery Replacement 24,500 24,500 - 24,500 0.0% 24,500 24,500 - 24,500 0.0% In Process Under Design
18 EE1403 Distribution Upgrades 61,000 61,000 - 61,000 0.0% 61,000 61,000 - 61,000 0.0%
19 EE1404 Lighting Improvements 50,000 50,000 35,314 14,686 70.6% 50,000 50,000 35,314 14,686 70.6% In Process Under Construction
20 EE1405 Distribution Feeder Replacement Program 170,200 170,200 - 170,200 0.0% 170,200 170,200 - 170,200 0.0%
21 EE1406 Distribution Capacitors & Controls 60,000 60,000 29,328 30,672 48.9% 60,000 60,000 29,328 30,672 48.9% Complete Complete
22 EE1407 Transmission Line Maintenance Program 75,000 75,000 - 75,000 0.0% 75,000 75,000 - 75,000 0.0%
23 EE1408 Substation Switch Replacement 80,000 80,000 - 80,000 0.0% 80,000 80,000 - 80,000 0.0%
24 EE1410 Air Mobility Command - 13,500 815 12,685 6.0% 13,500 13,500 815 12,685 6.0% In Process New Design
25 EE1411 Bergald Lane (DAFB) - 29,000 28,709 291 99.0% 29,000 29,000 28,709 291 99.0% Complete Complete
26 EE1412 Capital City Trail - 26,500 21,448 5,052 80.9% 26,500 26,500 21,448 5,052 80.9% Complete Complete
27 EE1413 Lebanon 400 Feeder 20,000 20,000 - 20,000 0.0% 20,000 20,000 - 20,000 0.0% In Process Material Ordered
28 EE1414 New Developments 600,000 144,000 89 143,911 0.1% 144,000 144,000 89 143,911 0.1%
29 EE1417 Bayside Drive (Persimmon Tree to White Oak Rd) 42,300 42,300 38,634 3,666 91.3% 42,300 42,300 38,634 3,666 91.3% Complete Complete
30 EE1418 The Grande - 28,000 10,068 17,932 36.0% 28,000 28,000 10,068 17,932 36.0% Complete Complete
31 EE1419 Home 2 Suites Hotel - 37,000 - 37,000 0.0% 37,000 37,000 - 37,000 0.0% In Process Under Construction
32 EE1421 Richardson Circle Upgrade 91,000 91,000 - 91,000 0.0% 91,000 91,000 - 91,000 0.0% In Process Under Construction
33 EE1423 7-Eleven New Service - 5,800 4,397 1,403 75.8% 5,800 5,800 4,397 1,403 75.8% Complete Complete
34 EE1424 McKee Run Substation Repairs 45,000 45,000 - 45,000 0.0% 45,000 45,000 19,262 25,738 42.8% In Process Under Construction
35 EE1425 EZ-Pass Delaware - 12,000 9,351 2,649 77.9% 12,000 12,000 9,351 2,649 77.9% Complete Complete
36 EE1426 Eden Hill Entrance - 52,400 7,861 44,539 15.0% 52,400 52,400 7,861 44,539 15.0% In Process Under Construction
37 EE1428 Tidewater General Green - 34,000 9,824 24,176 28.9% 34,000 34,000 9,824 24,176 28.9% In Process Under Construction
38 EE1429 Clearview Meadows - 88,000 4,108 83,892 4.7% 88,000 88,000 4,108 83,892 4.7% Not Started
39 EE1430 Calpine Equipment Move - 83,000 21,986 61,014 26.5% 83,000 83,000 21,986 61,014 26.5% Complete Complete
ATTACHMENT #1
40 EE1431 Generals Green Lighting - 20,500 477 20,023 2.3% 20,500 20,500 477 20,023 2.3% In Process Under Construction
41 EE1432 Connective @ 409 Pickering Beach Rd - 20,200 - 20,200 0.0% 20,200 20,200 - 20,200 0.0% In Process Under Construction
42 EE1434 50 Wolfcreek - Dr. Patel - 6,100 - 6,100 0.0% 6,100 6,100 - 6,100 0.0% In Process Under Construction
Will complete Spring outage -
43 EG1402 Unit 3 Cooling Tower Repairs 42,000 42,000 31,575 10,425 75.2% 42,000 42,000 31,575 10,425 75.2% In Process PO for work issued
44 EG1404 McKee Run #3 Aux System Component 116,000 116,000 42,922 73,078 37.0% 116,000 116,000 42,922 73,078 37.0% In Process Will complete Spring outage
45 EG1405 VanSant #11 Component Replacement 32,000 32,000 30,588 1,412 95.6% 32,000 32,000 30,588 1,412 95.6% In Process Will complete Spring outage
Will complete Spring outage -
46 EG1406 McKee Run Energy Pipe Replacement 80,000 80,000 660 79,340 0.8% 80,000 80,000 660 79,340 0.8% In Process PO for work issued
Multi-year project - Design to
47 EG1407 Metering System Upgrades 25,000 25,000 - 25,000 0.0% 25,000 25,000 - 25,000 0.0% In Process be complete Spring
48 EG1408 McKee/VanSant Safety & Compliance 86,000 86,000 - 86,000 0.0% 86,000 86,000 - 86,000 0.0% In Process Will complete in Spring
49 EG1409 McKee Run Natural Gas Valves 65,000 65,000 - 65,000 0.0% 65,000 65,000 - 65,000 0.0% In Process Will complete Spring outage
Work on hold pending
50 EG1413 McKee/VanSant Preserve Structure 42,000 42,000 - 42,000 0.0% 42,000 42,000 - 42,000 0.0% In Process additional funds needed
51 EG1415 McKee Run Units 1 & 2 component Replacement 105,000 105,000 31,173 73,827 29.7% 105,000 105,000 31,173 73,827 29.7% In Process Will Complete spring outage
Utility Committee Meeting of 02-10-2014
Multi-year project - Design to
52 EG1416 VanSant Capacity Increase 250,000 250,000 24,920 225,080 10.0% 250,000 250,000 24,920 225,080 10.0% In Process be complete Spring
53 $ 2,834,000 $ 2,878,600 $ 384,247 $ 2,494,353 0.0% $ 2,834,000 $ 2,878,600 $ 403,509 $ 2,475,091 14.0%
54
55 Grand Totals $ 6,516,800 $ 7,000,736 $ 2,106,549 $ 4,894,187 54.6% $ 5,623,600 $ 5,902,100 $ 974,604 $ 4,927,496 16.5%
Legend
M = Multi-year project - a project with a specific schedule to occur over multiple years. B = Bonded Project
R = Recurring project - a project that begins and ends each fiscal year and is re-budgeted to start over each fiscal year. S = State fully or partially reimbursed project