Página 1
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
AGENDA
APRIL 23, 2012 - 5:45 P.M.
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA
DOVER, DELAWARE
Public comments are welcomed on any item and will be permitted at appropriate times.
When possible, please notify the City Clerk (736-7008 or e-mail at CityClerk@dover.de.us)
should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. Filling of Critical Positions
A. Mailroom Clerk - Central Services
B. Motor Equipment Operator (MEO) I - Water (Downgrade from Water Serviceperson) and Motor
Equipment Operator (MEO) II - Wastewater (Downgrade from Heavy Equipment Operator
(HEO) II)
C. Motor Equipment Operator (MEO) II - Sanitation
D. Utility Maintenance Mechanic (UMM) I - Wastewater
E. Water Plant Operator I - Water Treatment Plant
2. Minority Recruitment Committee Recommendations
(Referred to Staff by Committee on January 23, 2012 for a Report Back to the Committee Within
60 Days)
3. Assignment of Emergency Management Coordinator Responsibilities
(Deferred by Committee on April 9, 2012)
4. Presentation - Comprehensive Annual Financial Report (CAFR) - Fiscal Year Ended June 30, 2011
5. FY 2013 Five-Year Capital Investment Plan (CIP)
6. Proposed Land Lease Agreement - Boys and Girls Club
7. Authorization to Proceed with Reading Garden - Library
8. Public Comment Period
9. Adjournment by 7:00 P.M.
/tm
S:\AGENDAS & MINUTES\Committee-Agendas\2012\04-23-2012 LF&A.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE
THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Página 3
Hiring Justification Outline
1. Explain the principal function of this job.
Process and deliver mail and fill supply requisitions for administrative supplies. Responsible for U.S. and
City mail. Processes outgoing U.S. mail including weighing, applying postage, and preparing necessary
forms. Processes incoming and interdepartmental mail. Collects and records data for reports and briefings.
Performs duties as back-up Storekeeper/Buyer. Performs on-call duties.
2. Explain why this position is critical and cannot go unfilled or postponed.
This is a full time position essential to the City of Dover’s ability to send billing notices, tax notices, and
various business licensing forms to the businesses and citizens on the city. This position also performs
as the internal transporter of correspondence and administrative supplies to all city departments. If this
position were to remain vacant, the Storekeepers and Procurement Manager would continue to perform
the mail duties at a reduced level of support. If the Mail Clerk job continues to be shared, the individual
functions of the warehouse and procurement will continue to erode. Another retirement of the
warehouse staff will occur in this Division in May 2012, which is not planned to be filled at this time.
The Central Mail Clerk’s position is of more priority.
3. How would City services diminish if this position were not filled or postponed at this time?
If the position were not filled see above. If the position were postponed, the warehouse staff would
rotate the duty between partially trained individuals. The warehouse is currently at 50% manning. This
has degraded the ability of the warehouse to provide adequate customer support and perform their
required logistical accounting duties. The warehouse has had to close to issue items from other than the
main building because of the lack of sufficient manpower to remain open in more than one geographical
location. Currently when one person is on vacation and one is sick, there will be no mailroom support.
The staff has shared the responsibility of this position along with performing their warehouse functions
and as a result this has affected the timely processing of materials for stock and special projects.
Warehouse resupply of critical Electric and Water/Wastewater stock has been reduced to once a week.
4. Are there other employees whose ability to perform would be diminished by not filling or postponing
this position?
In addition to the warehouse and purchasing staff, all city departments could have their ability to
perform their duties degraded. Distribution of office supplies and the flow of interoffice information
would be hindered. We are currently limited to one delivery to the Post Office per day. This has
delayed critical mailings by 24 to 72 hours, depending on the day of the week.
5. Is there a person that can be promoted into this position and whose position is less critical at this time
and can go unfilled permanently or temporarily?
The FY13 budget is reduced by higher grade staff position due to a retirement. The position will be
posted for in-house recruitment.
6. Can one or more existing employees absorb the duties of this position?
No. The ultimate effect would be a degradation of the service being provided by the current Mail Clerk
and a corresponding loss of service by the office providing the temporary position.
7. Could a temporary person be hired to fill this position for 60 days?
No. The individual hired must be trained on the operation of the Pitney Bows postage machine, inserter,
and the Pitney Bows mailer.
Rev. 4/10/12
Página 4
City of Dover
Wage and Benefit Information for Employee Hiring and Transfers
Department/Division Originating Request Finance Department ‐ Central Services Division
Date 4/10/2012 (Form has been developed to handle multiple departments/multiple funds to cover allocated departments and funding sources)
# Mos. To Date Lump Sum
Current Separation Wages Benefits Annual Wages & % Year Benefits To Date Benefits Wages & Paid To Date Current Fiscal
Current Positions Grade/Step Date * Budgeted Budgeted Benefits Wages Paid Paid Wages Paid Paid Benefits Paid (I, J, K) Year Balance Remarks
Position(s)
Central Mail Clerk 13/3 10/21/11 28,944.40 8,928.78 37,873.18 30.6% 4 8,857.30 2,976.26 626.20 12,459.76 25,413.42
Totals $37,873.18 12,459.76 25,413.42
% Year # Mos. Estimated
Replacement/ Proposed Projected Estimated Estimated Estimated Total Wages Benefits Amount
Transfer Position Grade/Step Hire Date Wages Benefits Compensation Needed Needed Wages Benefits Needed Remarks
Position(s)
Central Mail Clerk 13/1 7/1/12 27,435.20 14,567.00 42,002.20 0.0% 0 ‐ ‐ ‐
Totals $42,002.20 ‐
Balance ($4,129.02) $25,413.42
Increase/ Description of funding
Department Summary (Decrease) Funding Source: (See below Fund Budget) source General Ledger Account
Police ‐ Civilian ‐ General Fund ($2,617.58) N/A N/A
Central Services ‐ Warehouse (25,413.42) Water/Wastewater Fund (2,109.31) N/A N/A
Human Resources 0.00 Electric Fund (20,686.52) N/A N/A
Total ($25,413.42) Grant Fund 0.00 N/A N/A
Total ($25,413.42)
Department/Division Department/Division Department/Division
Fund Budget ‐ Increase/(Decrease) Police/Civilian Cent Ser/Warehouse Human Resources
Increase/ Increase/ Allocation Increase/ Increase/
Fund (Decrease) Allocation % (Decrease) % (Decrease) Allocation % (Decrease)
General Fund ($2,617.58) 100.0% $0.00 10.3% (2,617.58) 76.5% ‐ Allocated Department
Water/Wastewater Fund (2,109.31) 0.0% $0.00 8.3% (2,109.31) 9.0% ‐ percentages can be found
Electric Fund (20,686.52) 0.0% $0.00 81.4% (20,686.52) 14.5% ‐ in Budget Document,
Grant Fund 0.00 0.0% $0.00 0.0% ‐ 0.0% ‐ obtained from Finance or
Total ($25,413.42) Total $0.00 Total ($25,413.42) Total $0.00 the City Manager's Office
This form is to be completed when requesting to fill vacant positions or to transfer staff between divisions or operating funds. The purpose of which is to determine how changes in personnel will affect
the budget for each operating fund. If the changes increase operating expenses then the funding source to cover the increase is to be included.
Página 7
A B C D E F G H I J K L M N
1 City of Dover
2 Wage and Benefit Information for Employee Hiring and Transfers
3
4 Department/Division Originating Request Department of Public Works - Water / Wastewater Management
5 Date 4/23/2012
6
# Mos. To Date Lump Sum Paid To
FY 2012 Current Separation Wages Benefits Annual Wages & % Year Benefits To Date Benefits Wages & Date Current Fiscal
7 Current Positions Grade/Step Date * Budgeted Budgeted Benefits Wages Paid Paid Wages Paid Paid Benefits Paid (I, J, K) Year Balance Remarks
8 Position(s)
Water Service 14/4 2/3/12 31,390.00 21,603.63 52,993.63 59.3% 8 21,068.74 11,250.00 - 32,318.74 20,674.89
9 Person
Heavy Equip. Op. II 19/13 10/4/11 51,183.43 22,324.15 73,507.58 26.0% 3 14,119.68 4,172.60 - 18,292.28 55,215.30
10
11 - - - 0.0% 0 - - - - -
12 - - - 0.0% 0 - - - - -
13 Totals $126,501.21 50,611.02 $75,890.19
14
FY 2013 % Year # Mos. Estimated
Replacement/ Proposed Projected Estimated Estimated Estimated Total Wages Benefits Amount
15 Transfer Position Grade/Step Hire Date Wages Benefits Compensation Needed Needed Wages Benefits Needed Remarks
16 Position(s)
17 MEO I 11/1 7/1/12 27,523.00 16,409.00 43,932.00 100.0% 12 - - 43,932.00
18 MEO II 13/1 7/1/12 31,117.00 17,040.00 48,157.00 100.0% 12 - - 48,157.00
19 - - - 0.0% 0 - - -
20 - - - 0.0% 0 - - -
21 Totals $92,089.00 $92,089.00
22
23 Increase / (Decrease) ($34,412.21)
24
Increase/ Description of funding
25 Department Summary (Decrease) Funding Source: (See below Fund Budget) source General Ledger Account
26 Public Works (34,412.21) General Fund $0.00 N/A N/A
27 0.00 Water/Wastewater Fund (34,412.21) Net savings to budget 412-6800-568.xxxx
28 0.00 Electric Fund 0.00 N/A N/A
29 Total ($34,412.21) Grant Fund 0.00 N/A N/A
30 Total ($34,412.21)
31
32 Department/Division Department/Division Department/Division
33 Fund Budget - Increase/(Decrease) Public Works/W/WW Man.
Increase/ Increase/ Allocation Increase/ Increase/
34 Fund (Decrease) Allocation % (Decrease) % (Decrease) Allocation % (Decrease)
35 General Fund $0.00 0.0% $0.00 0.0% - 0.0% -
36 Water/Wastewater Fund (34,412.21) 100.0% ($34,412.21) 0.0% - 0.0% -
37 Electric Fund 0.00 0.0% $0.00 0.0% - 0.0% -
38 Grant Fund 0.00 0.0% $0.00 0.0% - 0.0% -
39 Total ($34,412.21) Total ($34,412.21) Total $0.00 Total $0.00
40
Página 8
Hiring Justification Outline
Department of Public Works – Motor Equipment Operator I and II
1. Explain the principal function of this job.
- Operate and Maintain, Repair and/or Replace approximately 195 miles of water
main ranging in size from one and one-half inches (1-1/2”) to sixteen-inches (16”).
Key Operational and Maintenance activities include Water System Flushing and Fire
Hydrant Flow Testing.
- Operate and Maintain, Repair and/or Replace over 1,600 fire hydrants and 1,800
division valves.
- Operate and Maintain, Repair and/or Replace over 185 miles of gravity sewer main
and force main ranging in size from four-inches (4”) to thirty-six inches (36”). Key
Operational and Maintenance activities include Sewer Main Cleaning and Sewer
Main Video Inspections.
- Operate and Maintain, Repair and/or Replace approximately 14,000 water service
lines, sanitary sewer laterals and water meters.
- Respond and Resolve Customer Complaints such as sewer backups and water leaks.
2. Explain why this position is critical and cannot go unfilled or postponed.
The Water / Wastewater Management Division within the Department of Public Works has
developed four (4) vacancies over the past two (2) years during the hiring freeze period.
During this time, critical operations, such as responding to emergencies, for the water and
wastewater systems take priority. Unfortunately in cases such as this, when man hours are
limited, it is typically preventative maintenance that suffers and gets postponed or delayed.
A primary and critical example of this is the cleaning of the sewer system. It is always a goal
to clean the gravity lines between six and eighteen inches (6” – 18”) twice a year. (Although
some trouble areas are cleaned monthly, every six (6) months has been found useful to clear
roots, remove grease, and remove debris from lines at minimum slope due to local
topography.) This has often been a challenge with long-term equipment breakdowns, the
overlapping flushing schedule, leave schedules, and varying time frames of freezing
temperatures. The difficulty in reaching this goal has now been intensified with staffing
shortages even though sewer cleaning is an established priority for remaining staff. The
reason this is a priority can be seen below. (Please note that the pictures below are only
samples and these concerns can be seen throughout the system.)
Página 9
Hiring Justification Outline
Department of Public Works – Motor Equipment Operator I and II
April 23, 2012
Page 2 of 5
Figure 1: Mushrooms growing inside sanitary sewer main, Gunning Bedford Drive, proving that soil is infiltrating the main
Figure 2: Grease build up and roots in Nathaniel Mitchell Road, all but eliminating the sewer diameter
Figure 3: Tree roots provide a wall that will accumulate debris in Nathaniel Mitchell Road
Página 10
Hiring Justification Outline
Department of Public Works – Motor Equipment Operator I and II
April 23, 2012
Page 3 of 5
Figure 4: Grease and root problems in Nathaniel Mitchell Road
Figure 5: Root Ball blocking the sanitary sewer main in E. Loockerman Street Alley
Figure 6: Large root ball eliminating 25% of the sanitary sewer capacity, in E. Loockerman Street Alley
Página 11
Hiring Justification Outline
Department of Public Works – Motor Equipment Operator I and II
April 23, 2012
Page 4 of 5
Figure 7: Multiple grease deposits on sewer main, restricting possible flow, in S. Bradford Street
During this time period, the Department has also starting utilizing a new sanitary sewer
video inspection truck. Through the utilization of this new truck, staff has developed a
preferred sewer cleaning method which involves the running the camera truck in
conjunction with the two (2) jet trucks. This will ensure that the crew is able to confirm that
the cleaning operation is performed thoroughly. It is difficult at best to confirm that the
jetting operation is properly addressing debris within the main or whether a grease nozzle or
root cutter is required. The video will allow the selection of the appropriate tools and avoid
damage to the main. To perform this however, three (3), two (2) man crews must be utilized
which we will only have adequate staffing for in conjunction with this staffing request.
Without these positions we will not be able to meet the quantity and quality of jetting
necessary.
As the system ages it is critical to insure that the investment is made in the preventative
maintenance of our infrastructure components. It is only through preventative maintenance
that our infrastructure will last until we are financially able to replace it and that complaints
and claims are kept to a minimum. In order to help achieve this goal, it is proposed to
downgrade the vacant Heavy Equipment Operator II position and Water Service Person
position with a Motor Equipment Operator II position with a Motor Equipment Operator
II position and Motor Equipment Operator I position, respectively, in order to better utilize
staff.
3. How would City services diminish if this position were not filled or postponed at this
time?
The Water / Wastewater Management Division’s ability to perform preventative
maintenance on our infrastructure will continue to decrease. Although the effects may not
become evident immediately due to the size of the systems, emergency repairs, complaints,
and claims will increase over time.
4. Are there other employees whose ability to perform would be diminished by not
filling or postponing this position?
Yes. As noted above, work is currently being managed by adjusting employee’s duties within
the division by addressing what is most important on a day to day basis. This often leaves
Página 12
Hiring Justification Outline
Department of Public Works – Motor Equipment Operator I and II
April 23, 2012
Page 5 of 5
preventative maintenance activities that are postponed or delayed. This also limits
employees from performing to the full capacity for which they were hired
5. Is there a person that can be promoted into this position and whose position is less
critical at this time and can go unfilled permanently or temporarily?
Not within the Department.
6. Can one or more existing employees absorb the duties of this position?
No. Duties have already been modified to the maximum extent possible to accommodate
the current hiring freeze and additional duties cannot be absorbed. As noted above, it is not
recommended to continue at the current levels due to the potential consequences to
operational level of the water and wastewater systems.
7. Could a temporary person be hired to fill this position for 60 days?
This position cannot be filled by a traditional “temporary” person. Temporary staff
are unable to drive City vehicles, are not able to operate critical equipment such as jet
truck or camera truck, and do not have knowledge of the water and wastewater
systems. The positions that are part of this hiring request, which will perform the
duties listed in Item #1, are not general labor positions.
8. Grade/Salary Information
The Motor Equipment Operator I position is a Pay Grade 11 in the IUE Wage Scale.
Starting hourly rate at Step 1 is $12.15 / hour.
The Motor Equipment Operator II position is a Pay Grade 13 in the IUE Wage Scale.
Starting hourly rate at Step 1 is $13.19 / hour.
Rev. 3/01/10
Página 14
A B C D E F G H I J K L M N
1 City of Dover
2 Wage and Benefit Information for Employee Hiring and Transfers
3
4 Department/Division Originating Request Department of Public Works - Sanitation
5 Date 4/23/2012
6
# Mos. To Date Lump Sum Paid To
FY 2012 Current Separation Wages Benefits Annual Wages & % Year Benefits To Date Benefits Wages & Date Current Fiscal
7 Current Positions Grade/Step Date * Budgeted Budgeted Benefits Wages Paid Paid Wages Paid Paid Benefits Paid (I, J, K) Year Balance Remarks
8 Position(s)
9 MEO II 13/5 9/12/11 31,118.85 15,211.59 46,330.44 19.9% 3 6,779.32 2,334.46 - 9,113.78 37,216.66
10 - - - 0.0% 0 - - - - -
11 - - - 0.0% 0 - - - - -
12 - - - 0.0% 0 - - - - -
13 Totals $46,330.44 9,113.78 $37,216.66
14
FY 2013 % Year # Mos. Estimated
Replacement/ Proposed Projected Estimated Estimated Estimated Total Wages Benefits Amount
15 Transfer Position Grade/Step Hire Date Wages Benefits Compensation Needed Needed Wages Benefits Needed Remarks
16 Position(s)
17 MEO II 13/1 7/1/12 28,422.00 17,182.00 45,604.00 100.0% 12 - - 45,604.00
18 - - - 0.0% 0 - - -
19 - - - 0.0% 0 - - -
20 - - - 0.0% 0 - - -
21 Totals $45,604.00 $45,604.00
22
23 Increase / (Decrease) ($726.44)
24
Increase/ Description of funding
25 Department Summary (Decrease) Funding Source: (See below Fund Budget) source General Ledger Account
26 Public Works (726.44) General Fund ($726.44) Net savings to budget 110-1800-555.xxxx
27 0.00 Water/Wastewater Fund 0.00 N/A N/A
28 0.00 Electric Fund 0.00 N/A N/A
29 Total ($726.44) Grant Fund 0.00 N/A N/A
30 Total ($726.44)
31
32 Department/Division Department/Division Department/Division
33 Fund Budget - Increase/(Decrease) Public Works/Sanitation
Increase/ Increase/ Allocation Increase/ Increase/
34 Fund (Decrease) Allocation % (Decrease) % (Decrease) Allocation % (Decrease)
35 General Fund ($726.44) 100.0% ($726.44) 0.0% - 0.0% -
36 Water/Wastewater Fund 0.00 0.0% $0.00 0.0% - 0.0% -
37 Electric Fund 0.00 0.0% $0.00 0.0% - 0.0% -
38 Grant Fund 0.00 0.0% $0.00 0.0% - 0.0% -
39 Total ($726.44) Total ($726.44) Total $0.00 Total $0.00
40
Página 15
Hiring Justification Outline
Department of Public Works – Motor Equip. Operator I - Sanitation
1. Explain the principal function of this job.
- Collection and transportation of municipal solid waste, hand trash, bulk household
trash, yard waste, and bulk yard waste for approximately 11,000 accounts.
- Assist in the disposal of approximately 13,000 tons of domestic trash and
approximately 2,400 tons of yard waste per year.
- Operation of rear loading, bulk and automated trash trucks as needed.
- Delivery, pick up, and repair of City of Dover furnished containers.
2. Explain why this position is critical and cannot go unfilled or postponed.
Refuse collection is an important service provided to the residents of Dover. In order to
continue to provide this quality service requires trained and diverse employees.
3. How would City services diminish if this position were not filled or postponed at this
time?
We would not have enough manpower to maintain the current level of staff necessary to
handle picking up of bulk trash and yard waste.
4. Are there other employees whose ability to perform would be diminished by not
filling or postponing this position?
Diminished ability to collect trash will lead to degradation in our sanitation services in
general.
5. Is there a person that can be promoted into this position and whose position is less
critical at this time and can go unfilled permanently or temporarily?
Not within the Department.
6. Can one or more existing employees absorb the duties of this position?
No. The other employees in this Division already have assigned duties consistent
with Item #1. This Division has also been utilizing staff from the Streets Division to
fulfill the tasks of the Sanitation Division. It is critical that the work of the Streets
Division be completed as required as well.
7. Could a temporary person be hired to fill this position for 60 days?
This position cannot be filled by a traditional “temporary” person. Temporary staff
are unable to drive City vehicles, are not able to operate specialized equipment, and
do not have knowledge of the daily routes. The position that is part of this hiring
request, which will perform the duties listed in Item #1, is not a general labor
position.
8. Grade/Salary Information
Página 16
Hiring Justification Outline
Department of Public Works – Motor Equipment Operator I - Sanitation
April 23, 2012
Page 2
The Motor Equipment Operator II position is a Pay Grade 13 in the IUE Wage Scale.
Starting hourly rate at Step 1 is $13.19 / hour.
Rev. 3/01/10
Página 18
A B C D E F G H I J K L M N
1 City of Dover
2 Wage and Benefit Information for Employee Hiring and Transfers
3
4 Department/Division Originating Request Department of Public Works - Wastewater
5 Date 4/23/2012
6
# Mos. To Date Lump Sum Paid To
FY 2012 Current Separation Wages Benefits Annual Wages & % Year Benefits To Date Benefits Wages & Date Current Fiscal
7 Current Positions Grade/Step Date * Budgeted Budgeted Benefits Wages Paid Paid Wages Paid Paid Benefits Paid (I, J, K) Year Balance Remarks
8 Position(s)
Utility Maint Mech 15/6 3/23/12 34,935.71 19,952.60 54,888.31 72.7% 9 28,977.68 11,686.00 - 40,663.68 14,224.63
9 I
10 - - - 0.0% 0 - - - - -
11 - - - 0.0% 0 - - - - -
12 - - - 0.0% 0 - - - - -
13 Totals $54,888.31 40,663.68 $14,224.63
14
FY 2013 % Year # Mos. Estimated
Replacement/ Proposed Projected Estimated Estimated Estimated Total Wages Benefits Amount
15 Transfer Position Grade/Step Hire Date Wages Benefits Compensation Needed Needed Wages Benefits Needed Remarks
16 Position(s)
Utility Maint Mech 15/1 7/1/12 31,883.00 17,508.00 49,391.00 100.0% 12 - - 49,391.00
17 I
18 - - - 0.0% 0 - - -
19 - - - 0.0% 0 - - -
20 - - - 0.0% 0 - - -
21 Totals $49,391.00 $49,391.00
22
23 Increase / (Decrease) ($5,497.31)
24
Increase/ Description of funding
25 Department Summary (Decrease) Funding Source: (See below Fund Budget) source General Ledger Account
26 Public Works (5,497.31) General Fund $0.00 N/A N/A
27 0.00 Water/Wastewater Fund (5,497.31) Net savings to budget 412-6900-569-xx-xx
28 0.00 Electric Fund 0.00 N/A N/A
29 Total ($5,497.31) Grant Fund 0.00 N/A N/A
30 Total ($5,497.31)
31
32 Department/Division Department/Division Department/Division
33 Fund Budget - Increase/(Decrease) Public Works/Wastewater
Increase/ Increase/ Allocation Increase/ Increase/
34 Fund (Decrease) Allocation % (Decrease) % (Decrease) Allocation % (Decrease)
35 General Fund $0.00 0.0% $0.00 0.0% - 0.0% -
36 Water/Wastewater Fund (5,497.31) 100.0% ($5,497.31) 0.0% - 0.0% -
37 Electric Fund 0.00 0.0% $0.00 0.0% - 0.0% -
38 Grant Fund 0.00 0.0% $0.00 0.0% - 0.0% -
39 Total ($5,497.31) Total ($5,497.31) Total $0.00 Total $0.00
40
Página 19
Hiring Justification Outline
Department of Public Works – Utility Maintenance Mechanic I
1. Explain the principal function of this job.
- Operate, Maintain and Repair the City’s thirty-nine (39) pump stations. (This
number of pump stations reflects the recent abandonment of PS #17, Schwartz, as
well as the transference of PS #12, Dover East, to Kent County which will be
complete by next fiscal year. It is anticipated that these pump stations will likely be
replaced with new pump stations at the new Dover High School location as well as
the Clearview Meadows subdivision in Fiscal Year 2013.)
2. Explain why this position is critical and cannot go unfilled or postponed.
The Water / Wastewater Management Division within the Department of Public Works has
developed four (4) vacancies over the past two (2) years during the hiring freeze period.
One (1) of these positions is within the Pump Station Crew Section. This section currently
operates and maintains the City’s pump stations as noted above. It has been established that
only through the maintenance regime performed by three (3), two (2) man crews have the
pump stations been able to exceed the projected life expectancy of the manufacturer. The
daily/weekly and monthly maintenance activities are provided below. Any reduction in
staffing levels prohibits the ability to reach these goals and increases the potential for
failures.
Daily/weekly maintenance involves physically checking all stations repairing any issues
encountered that could affect station performance. This also includes checking the station
and surrounding environment for safety. Additional duties include inspecting the wet well,
floats and transducer; checking circuit breakers and indication lights; inspecting and verifying
operation of sewage pumps, air compressors, vacuum pumps, mercury switches, pressure
switches, pressure transducers, float switches, check valves, hour meters, piping and all
electrical components to include motor starters, PLC, VFD, relays, timers, alternators and
wiring. Repairs are performed as necessary. Daily records are kept for data as well as any
maintenance performed.
Monthly maintenance involves cleaning the wet wells, parshall flume and settlement pits of
accumulated grease, grit and solid materials. In addition, cleaning, inspection, operational
verification and preventive maintenance is performed on the control systems of stations
which vary depending on station design. These include bubbler lines, floats, pressure
transducers, domes and electrodes, and sonic starts. The jet truck is used to flush force
mains where required. Monthly duties also require reporting gallons pumped, hours of
operation and other key data.
As the system ages it is critical to insure that the investment is made in the preventative
maintenance of our infrastructure components. It is only through preventative maintenance
that our infrastructure will last until we are financially able to replace it and that complaints
and claims are kept to a minimum. Our current replacement schedule is one pump station
per year. As such it is critical that the Department have the resources available to perform
preventative and corrective maintenance on pump stations to ensure the life cycle of each
exceeds standard recommendations.
3. How would City services diminish if this position were not filled or postponed at this
time?
Página 20
Hiring Justification Outline
Department of Public Works – Utility Maintenance Mechanic I
April 23, 2012
Page 2 of 2
The Wastewater Management Division’s ability to perform preventative maintenance and on
call response to our pump station infrastructure will continue to decrease. Although the
effects may not become evident immediately due to the size of the system; emergency
repairs, complaints, and claims will increase over time.
4. Are there other employees whose ability to perform would be diminished by not
filling or postponing this position?
Yes. As noted above, work is currently being managed by adjusting employee’s duties within
the division by addressing what is most important on a day to day basis. This often leaves
preventative maintenance activities that are postponed or delayed. This also limits
employees from performing to the full capacity for which they were hired.
5. Is there a person that can be promoted into this position and whose position is less
critical at this time and can go unfilled permanently or temporarily?
Not within the Department.
6. Can one or more existing employees absorb the duties of this position?
No. Duties have already been modified to the maximum extent possible to accommodate
the current hiring freeze and additional duties cannot be absorbed. As noted above, it is not
recommended to continue at the current levels due to the potential consequences to the
operational level of the wastewater systems.
7. Could a temporary person be hired to fill this position for 60 days?
This position cannot be filled by a traditional “temporary” person. Temporary staff
are unable to drive City vehicles, are not able to operate critical equipment, and do
not have knowledge of the wastewater system or pump station infrastructure. The
position that is part of this hiring request, which will perform the duties listed in Item
#1, is not a general labor position.
8. Grade/Salary Information
The Utility Maintenance Mechanic I position is a Pay Grade 15 in the IUE Wage Scale.
Starting hourly rate at Step 1 is $14.38 / hour.
Rev. 3/01/10
Página 22
A B C D E F G H I J K L M N
1 City of Dover
2 Wage and Benefit Information for Employee Hiring and Transfers
3
4 Department/Division Originating Request Department of Public Works - Water Treatment & Production
5 Date 4/23/2012
6
# Mos. To Date Lump Sum Paid To
FY 2012 Current Separation Wages Benefits Annual Wages & % Year Benefits To Date Benefits Wages & Date Current Fiscal
7 Current Positions Grade/Step Date * Budgeted Budgeted Benefits Wages Paid Paid Wages Paid Paid Benefits Paid (I, J, K) Year Balance Remarks
8 Position(s)
9 Water Op. I 15/13 5/29/12 46,740.85 21,540.84 68,281.69 91.0% 11 42,526.51 19,598.63 24,360.96 86,486.10 (18,204.41)
10 - - - 0.0% 0 - - - - -
11 - - - 0.0% 0 - - - - -
12 - - - 0.0% 0 - - - - -
13 Totals $68,281.69 86,486.10 ($18,204.41)
14
FY 2013 % Year # Mos. Estimated
Replacement/ Proposed Projected Estimated Estimated Estimated Total Wages Benefits Amount
15 Transfer Position Grade/Step Hire Date Wages Benefits Compensation Needed Needed Wages Benefits Needed Remarks
16 Position(s)
17 Water Op. I 15/1 7/1/12 32,709.00 17,642.00 50,351.00 100.0% 12 - - 50,351.00
18 - - - 0.0% 0 - - -
19 - - - 0.0% 0 - - -
20 - - - 0.0% 0 - - -
21 Totals $50,351.00 $50,351.00
22
23 Increase / (Decrease) ($17,930.69)
24
Increase/ Description of funding
25 Department Summary (Decrease) Funding Source: (See below Fund Budget) source General Ledger Account
26 Public Works (17,930.69) General Fund $0.00 N/A N/A
27 0.00 Water/Wastewater Fund (17,930.69) Net savings to budget 412-7600-576-xx-xx
28 0.00 Electric Fund 0.00 N/A N/A
29 Total ($17,930.69) Grant Fund 0.00 N/A N/A
30 Total ($17,930.69)
31
32 Department/Division Department/Division Department/Division
33 Fund Budget - Increase/(Decrease) Public Works/WTP
Increase/ Increase/ Allocation Increase/ Increase/
34 Fund (Decrease) Allocation % (Decrease) % (Decrease) Allocation % (Decrease)
35 General Fund $0.00 0.0% $0.00 0.0% - 0.0% -
36 Water/Wastewater Fund (17,930.69) 100.0% ($17,930.69) 0.0% - 0.0% -
37 Electric Fund 0.00 0.0% $0.00 0.0% - 0.0% -
38 Grant Fund 0.00 0.0% $0.00 0.0% - 0.0% -
39 Total ($17,930.69) Total ($17,930.69) Total $0.00 Total $0.00
40
Página 23
Hiring Justification Outline
Department of Public Works – Water Plant Operator I
1. Explain the principal function of this job.
- Operate and Maintain the Long Point Treatment Plant and seven (7) associated
Shallow Wells.
- Operate and Maintain the fifteen (15) Deep Wells and associated Micro-Plants.
- Operate and Maintain the six (6) Elevated Storage Tanks.
- Ensure proper water quality/quantity provided to the distribution system, by
drawing and analyzing samples, delivering chemicals, and adjusting chemical dosages,
at all Deep Wells and the Water Treatment Plant, in order to maintain the City’s
compliance with State and Federal Regulations.
- Assist Operator IIs with the implementation of projects assigned to the Water
Treatment Division.
2. Explain why this position is critical and cannot go unfilled or postponed.
Water production requirements for: Minimum Employee Hours / Week
Winter Summer Flushing
Regulatory Compliance & Production 200 280 360
Scheduled Maintenance 80 40 ---
Corrective Maintenance 80 --- ---
Assigned Projects --- 120 ---
Total 360 360 360
This equates to 9 employees per week. (Please note that this does not include
responsibilities of the supervisor for this Division.)
3. How would City services diminish if this position were not filled or postponed at this
time?
Attrition, for retirement, etc. will directly affect the Divisions ability to perform assigned
tasks such as the Unidirectional Flushing Project and SCADA programming as indicated in
# 2 above and # 4 below.
4. Are there other employees whose ability to perform would be diminished by not
filling or postponing this position?
As there is no relief operator for the Division, absences for leave directly impact the amount
of time allotted for the administrative / regulatory required duties of the Water Production
Supervisor as well as assigned project progress. Employee attrition will stop these projects
and possibly limit maintenance efforts.
5. Is there a person that can be promoted into this position and whose position is less
critical at this time and can go unfilled permanently or temporarily?
Not within the Department.
Página 24
Hiring Justification Outline
Department of Public Works – Water Plant Operator I
April 23, 2012
Page 2
6. Can one or more existing employees absorb the duties of this position?
Yes, but this will reduce productivity as indicated in # 3 and # 4 above. Only
minimum duties will be performed. This will be the case until a replacement operator
is fully trained, as indicated in # 7 below.
7. Could a temporary person be hired to fill this position for 60 days?
- The State of Delaware requires that most of the duties indicated above be
performed by a licensed Water Supply Operator. A temporary, one year,
Operator-In-Training license is granted to new operators (once they have
passed all necessary coursework and testing) so they may become trained and
licensed.
- This position cannot be filled by a traditional “temporary” person as it usually
takes a full year for new operators to become minimally competent with the
City’s water production and treatment systems [see # 6 above].
8. Grade/Salary Information
The Water Plant Operator I position is a Pay Grade 15 in the IUE Wage Scale. Starting
hourly rate at Step 1 is $14.38 / hour.
Rev. 3/01/10
Página 25
City Manager’s Implementation Plan for the Minority Recruitment Committee Recommendations
The Minority Recruitment Committee held a series of meetings during 2011 and concluded their work in August
2011. From the meetings held by this Committee, a series of recommendations were put forward, which were
shared with the Legislative, Finance and Administration Committee in January 2012. The Committee referred
the recommendations back to the City Manager for development of a plan to implement the recommendations.
This action plan includes a tentative timeline and strategy for addressing the recommendations of the Minority
Recruitment Committee.
To ensure that the action plan measures are completed in accordance within the specified tentative timelines, a
steering committee will be developed by the City Manager to include the Human Resources Director and various
staff members representing multiple City departments. This steering committee will meet quarterly or as
needed to ensure the actions are implemented.
Priority #1: Employee Morale
The Minority Recruitment Committee asserted that the low morale among City employees should be addressed
prior to actively recruiting new employees. The employee morale is largely tied to the City’s budget issues and
the overall stress under which the City organization functions. Four (4) recommendations were put forward by
the Minority Recruitment Committee to help address employee morale.
1. Implement mandatory structured training for all employees, including supervisors, managers, others
who supervise members of the Bargaining Units. Suggested training topics are Effective Communication
Skills, Harassment Prevention (verbal, sexual, etc.), Diversity and Employee Evaluations.
Implementation Plan: The City holds mandatory harassment and diversity training for employees.
Under the recommendation, this program should be expanded. One of the concerns associated with the
current training provided is that it involves a trainer “talking at” staff. An internal training committee
will be developed by the City Manager to include the Human Resources Department and key staff from
other departments to develop a training program that is more interactive and covers the variety of
topics that will help employees build their skills to thrive in the work place.
Timeline: This committee will be appointed by the City Manager in July 2012, and will be tasked with
developing an interactive training program to provide quarterly training for all employees beginning in
the fall of Fiscal Year 2013.
2. Implement a published document outlining procedures for hearing non-bargaining employee
grievances.
Implementation Plan: A grievance procedure is outlined in the Employee Handbook beginning on page
61. The procedure covers all employees and also indicates that the entire grievance procedure is
1
Página 26
subject to employee labor agreements, when applicable. Changes to the City’s Employee Handbook are
currently being developed by the Human Resources Director in draft form. Changes to this section can
be considered with the review of the entire document.
Timeline: Changes to the Employee Handbook will be presented to the Legislative, Finance, and
Administration Committee on or about July 2012.
3. Develop consistent training materials for all employees. Outside training materials should be considered
and adapted to the City’s needs.
Implementation Plan: This will be implemented along with the training program discussed in
recommendation #1.
4. Implement an on-going program of activities/communications for all employees to facilitate a sense of
pride and satisfaction. For example, holiday city-wide events, in-house newsletter, focusing on staff and
their accomplishments. Such activities are very low to no cost.
Implementation Plan: The Employee Committee has become active again, and is focusing its efforts on
planning and fundraising for a Christmas Party. The City Manager will offer support to expand the
Employee Committee and encourage the Committee to plan events throughout the year. Submissions
to an in-house newsletter could be part of the purview of the Employee Committee. A greater focus will
be placed on city-wide lunches to provide employees the opportunity to interact between various
departments. NOTE: The Employee Committee has considered disbanding due to lack of interest in
participation and fundraising. Support and enthusiasm needs to come from the management level to
reinvigorate the committee and improve participation.
Timeline: This will be implemented continually, beginning immediately through the Employee
Committee.
Priority #2: Upward Mobility/Career Ladder
The Minority Recruitment Committee report included the observation that the City’s workforce does not mirror
the population served by the City, particularly as it relates to minorities. Based on the attachments provided to
the Committee’s report, in March 2011 nearly 84 percent of the City’s workforce was white. By comparison,
according to the 2010 Census, only 45.6 percent of the City’s population is white.
1. Implement a “mentoring” program to identify employees who may wish to move up the career ladder
within the City.
Implementation Plan: The Human Resource Department will be assigned the task of developing an
internal mentoring program. Each department will be asked to identify at least one professional or
management level staff person who would be interested in serving as a volunteer professional mentor.
An application process would be developed for employees interested in working with a mentor to
2
Página 27
develop their career skills, and employees would be matched with a mentor whose professional
background generally meets their career interests. The mentoring program could involve “shadowing”
the mentor as well as regular meetings to help build the mentoring relationship.
Timeline: The program would be developed and mentors identified during fall 2012, with the
implementation of the proposed program in spring 2013.
2. Guidelines relative to goals and eligibility should be developed and made available to all employees, via
website, newsletter, bulletin boards, handbooks, etc.
Implementation Plan: This will be part of the implementation of #1.
3. Develop strategies to recruit minorities for professional positions.
Implementation Plan: The City of Dover currently sends send copies of all job postings for professional
positions to all colleges and/or universities within the City of Dover, as well as the Historically Black
Colleges in Delaware, Maryland, Pennsylvania, and New Jersey. In addition, the City reaches out to
various churches and civic entities in an effort to expand the applicant pool for vacancies (Attachment A
lists the various entities). The City will also approach the Delaware chapter of the NAACP for
suggestions in recruiting minority applicants.
Timeline: Staff will meet with the Delaware chapter of the NAACP in the summer of 2012 to develop
ideas for additional ways to expand the potential applicant pool.
Priority #3: Enhanced Technology for City Image and Recruitment
The Minority Recruitment Committee has recommended that the City’s website be updated to improve
recruitment opportunities by including information on recruitment, employee benefits, the City’s commitment
to diversity, and departmental goals and responsibilities.
1. The City’s website should be enhanced to convey pertinent information that may be of interest to a
prospective employee.
Implementation Plan: The Human Resources Department will be assigned the task of reviewing the
City’s website information relating to employment and to develop content to provide improved
information about the City as an employer to prospective employees.
Timeline: This review will be complete and the website content updated by October 1, 2012. This
timeline may be delayed if updating the website results in substantial costs that need to be budgeted.
2. The City should have links that will give specific information about the Departments.
Implementation Plan: Each Department Head will be assigned the task of reviewing the website
content relating to that department and providing updates as necessary on a continual basis.
3
Página 28
Timeline: Departments will be required to review and update departmental information by July 2012,
with minimum quarterly reviews thereafter. This will ensure that the information remains fresh.
3. There should be a standard format for information representing departments.
Implementation Plan: The City’s new website has established a standard format.
Priority #4: Internship for high school and college students
The Minority Recruitment Committee recommended that the City develop a well-defined internship program for
high school and college students who may be interested in a career in municipal government. This program
would include concerted effort to recruit African-Americans, Hispanics, and women.
Implementation Plan: Beginning in fall 2012, the Human Resources Director will schedule meetings with the
local colleges and high schools to assess their interest in an internship program. If there appears to be interest,
the Human Resources Director will work with the City departments, colleges and high schools to outline an
internship program that matches the needs of the City departments with the academic and community service
goals of the participating schools. Several issues would need to be determined prior to implementation of such
an internship program, including:
Will this be a paid internship program or an unpaid program?
How would students be recruited and placed?
Would students be eligible for academic credit?
What liabilities would be the city be incurring?
These issues would need to be explored in working with the schools involved. It is likely that a program for high
school students would be different from a program for college students. These issues would need to be worked
out during the development of the program.
Timeline: Staff will contact the schools in the fall of 2012. If the interest exists among the high schools and
colleges in the area, an internship program could be outlined and potentially proposed for the fall of 2013 which
is part of the 2013/2014 academic year.
4
Página 32
ACTION FORM
PROCEEDING: Legislation, Finance, and Administration Committee
DEPARTMENT OF ORIGIN: City Manager’s Office DATE SUBMITTED: April 17, 2012
PREPARED BY: Scott D. Koenig, P.E., City Manager
SUBJECT: Assignment of Emergency Management Coordinator Responsibilities
REVIEWED BY: City Manager
EXPENDITURE REQUIRED: See Below PROPOSED FY-12 BUDGET:
FUNDING SOURCE (Dept./Page in CIP & Budget):
TIME TIMETABLE: Upon Council Approval
RECOMMENDED ACTION: Assign the duties of the Emergency Management Coordinator position to Ms.
Dietz-Sass on a 6-month trial basis. These additional duties would be in addition to her current duties as the
Public Affairs Coordinator; thus she would be serving as both the Public Affairs Coordinator and the
Emergency Management Coordinator. During this 6-month trial basis, her salary of $40,830 would remain the
same and a bonus of $1,100.00 per month would be paid to compensate her for the added responsibilities. This
would increase her annualized compensation from $40,830 to $54,030. If, at the end of the 6-month trail, her
performance in both roles is acceptable to the City Manager, the bonus would be converted to base salary and
her grade adjusted from 116 to 120. If the City Manager determines that one person cannot adequately perform
the functions of both positions; then her responsibilities and compensation would be returned to the former
level and other alternatives would be proposed.
BACKGROUND AND ANALYSIS
Over the past ten (10) years, the various duties of Emergency Management have been executed by various
positions and departments throughout City government. These departments include the former Community
Services Department, the Police Department and most recently, the Public Services Department. After
September 11, 2001, federal and state emergency management requirements became more complex to include
requiring and tracking National Incident Management System (NIMS) training and having a NIMS compliant
Emergency Management Plan. These complexities supported a need for a fulltime Emergency Management
Coordinator (Grade 120). The City’s first fulltime Emergency Management Coordinator, Mr. Wayne
Hutchison, was hired (actually promoted from being an Inspector in the Fire Marshall’s Office) on June 2, 2008.
Mr. Hutchison retired on December 23, 2010. His final salary was $53,216. During his tenure, Mr. Hutchison
rewrote the City’s Emergency Management Plan, created an emergency call center, developed notification
protocols, equipped an EMC trailer, and secured various Homeland Security grants. In addition, Mr. Hutchison
was assigned safety related duties such as the routine inspection of Silver Lake Dam (due to engineering staff
constraints) and providing general safety training for various employee groups. Due to the economic
environment at the time of Mr. Hutchison’s announced retirement, the former City Manager elected to not fill
the vacated position. The duties of the position were divided amongst various staff members including the
Public Services Manager, the Public Affairs Coordinator and the City Manager.
Ms. Kay Dietz-Sass, Public Affairs Coordinator (Grade 116) has been a key member of our Emergency
Management Team since her employment began. After considerable thought, I have concluded that the best
option to continue the City’s Emergency Management efforts is to request permission from City Council to
assign the Emergency Management Coordinator responsibilities to Ms. Dietz-Sass. Ms. Dietz-Sass has degrees
in Business Management, General Business and Marketing. She has also completed the entire Professional
1
Página 33
Development Series for Emergency Management as well as successfully completing Advanced Public
Information Officer training. The attached list of completed courses through the U.S. Department of Homeland
Security, FEMA and DEMA is offered as additional support. In addition, Ms. Dietz-Sass worked closely with
Mr. Hutchison on various emergency procedures for the city, and has proven in several emergency conditions to
be a well-organized, decisive, and a dedicated individual. Ms. Dietz-Sass played a key role in opening a shelter
for 126 fire victims when Dover experienced our largest apartment fire in many years. She has also worked
closely with the NASCAR events, attended meetings for the implementation of the Dover Downs Joint
Operations Center, weather notifications, bridge calls with the State of Delaware, DEMA, and National Weather
Service, and more. The issue of Emergency Management has also been a topic of discussion at recent Safety
and Transportation Committee Meetings.
Based on my organizational assessment of this function, I believe it is in the best interest of the City for me to
assign the duties of the Emergency Management Coordinator position to Ms. Dietz-Sass on a 6-month trial
basis. These additional duties would be in addition to her current duties as the Public Affairs Coordinator; thus
she would be serving as both the Public Affairs Coordinator and the Emergency Management Coordinator.
During this 6-month trial basis, her salary of $40,830 would remain the same and a bonus of $1,100.00 per
month would be paid to compensate her for the added responsibilities. This would increase her annualized
compensation from $40,830 to $54,030. If, at the end of the 6-month trail, her performance in both roles is
acceptable to the City Manager, the bonus would be converted to base salary and her grade adjusted from 116 to
120. If the City Manager determines that one person cannot adequately perform the functions of both positions;
then her responsibilities and compensation would be returned to the former level and other alternatives would
be proposed.
Completed Class List
The classes through Department of Homeland Security, FEMA, DEMA:
WMD/Terrorism Preparedness Training:
Awareness Level:
AWR-102 Emergency Response to Terrorism: Basic Concepts
AWR-137 Critical Emergency Planning
AWR-140 WMD Radiological Nuclear Awareness
AWR-209 Dealing with the Media
Performance Level:
PER231 Prevention of and Response to Suicide Bombing Incidents
PER-252 Cybersecurity: Prevention, Deterrence and Recover
PER-253 Cybersecurity: Incident Handling and Response
Management Level:
MGT-301 Command and the WMD Response
MGT-310 WMD Threat and Risk Assessment
MGT-312 Senior Officials Workshop for All Hazards Preparedness
MGT 318 Mitigation Planning Workshop for Local Governments
NIMS/ICS:
ICS-100 Introduction to ICS
ICS-200 Incident Command System Basic for Federal Disaster Workers
2
Página 34
ICS 212 Unified Hazard Mitigation Assistance
IS 241 Decision Making
IS 242.a Effective Communication
IS 244.a Developing and Managing Volunteers
ICS-300 Intermediate ICS for Expanding Incidents
ICS 312 Continuity of Operations – Preparing the State Senior Officials Workshop For All
Hazards Workshop
ICS-400 Advanced ICS Command and General Staff—Complex Incidents
ICS-402 Incident Command System (ICS) Overview for Executives/Senior Officials
ICS-700 Introduction to the National Incident Management System
IS-800.a Introduction to National Response Plan Framework
IS-800.b National Response Framework
ICS-912 Preparedness Planning
IS 702 National Incident Management System (NIMS) Public Information Systems
E 388 Advanced Public Information Officer Course
G191 Incident Command System/Emergency Operations Center Interface
G290 Basic Public Information Officer
EOC Interface Workshop
Hurricane Preparedness- FEMA Training
Public Information Officer Training – DEMA Training
Advanced Public Information Officer- FEMA Training
Professional Development Series Certification for Emergency Management
IS-0001 Emergency Program Manager; An Orientation to the Position
ICS 139 Exercise Design
IS 230.a Fundamentals of Emergency Management
IS 235 Emergency Planning
IS 240 Leadership and Influence
State of DE:
Sediment and Stormwater Management Certification (Blue card) for State of DE
3
Página 35
A B C D E F G H I J K L M N
1 City of Dover
2 Wage and Benefit Information for Employee Hiring and Transfers
4 Department/Division Originating Request City Manager's Office
5 Date 4/17/2012 (Form has been developed to handle multiple departments/multiple funds to cover allocated departments and funding sources)
6
# Mos. To Date Lump Sum Paid To
Current Separation Wages Benefits Annual Wages & % Year Benefits To Date Benefits Wages & Date Current Fiscal
7 Current Positions Grade/Step Date * Budgeted Budgeted Benefits Wages Paid Paid Wages Paid Paid Benefits Paid (I, J, K) Year Balance Remarks
8 Position(s)
9 - -
10 Public Aff. Cord. 116 N/A 40,830.00 19,397.00 60,227.00 - 60,227.00
11
12
13 Totals 40,830.00 $60,227.00 - $60,227.00
14
% Year # Mos. Estimated
Replacement/ Proposed Projected Estimated Estimated Estimated Total Wages Benefits Amount
15 Transfer Position Grade/Step Hire Date Wages Benefits Compensation Needed Needed Wages Benefits Needed Remarks
16 Position(s)
17 P.A.C. / E.M.C. 116/120 N/A 40,830.00 19,397.00 60,227.00 -
18 Annualized Bonus 13,200.00 1,070.00 14,270.00
19
20
21 Totals 54,030.00 $74,497.00 $0.00
22
23 Balance ($14,270.00) $60,227.00
24
Increase/ Description of funding
25 Department Summary (Decrease) Funding Source: (See below Fund Budget) source General Ledger Account
26 City Manager's Office ($60,227.00) General Fund ($60,227.00) N/A N/A
27 0.00 Water/Wastewater Fund 0.00 N/A N/A
28 0.00 Electric Fund 0.00 Describe Account
29 Total ($60,227.00) Grant Fund 0.00 N/A N/A
30 Total ($60,227.00)
31
32 Department/Division Department/Division Department/Division
33 Fund Budget - Increase/(Decrease) Planning & Inspections Central Services/Facilities Human Resources
Increase/ Increase/ Allocation Increase/ Increase/
34 Fund (Decrease) Allocation % (Decrease) % (Decrease) Allocation % (Decrease)
35 General Fund ($60,227.00) 100.0% ($60,227.00) 10.3% - 76.5% - Allocated Department
36 Water/Wastewater Fund 0.00 0.0% $0.00 8.3% - 9.0% - percentages can be found
37 Electric Fund 0.00 0.0% $0.00 81.4% - 14.5% - in Budget Document,
38 Grant Fund 0.00 0.0% $0.00 0.0% - 0.0% - obtained from Finance or
39 Total ($60,227.00) Total ($60,227.00) Total $0.00 Total $0.00 the City Manager's Office
40
Página 36
Office of the Mayor
MEMORANDUM
TO: Legislative, Finance and Administration Committee
FROM: Carleton E. Carey, Sr.
Mayor
DATE: April 17, 2012
RE: Public Information Officer and Emergency Management Coordinator
The City Manager is proposing to combine the Public Information Officer position and the
Emergency Management Coordinator position. I would like the Committee to consider keeping
these two positions separate due to the demands of both positions.
The Emergency Management position requires a lot of time and training as well as working with
city employees. This position has been divided between three people over the last year and a
half. I believe it requires a lot more attention.
Emergency Management Coordinator needs to be performing the following:
Training of city personnel with First Aid, Automatic External Defibrillator (AED) and
safety equipment for all departments.
On-site inspection of different departments for safety needs.
Inspection of the city dam, required by the Department of Natural Resources, once a
month and file a report.
The City of Dover subsidizes the ambulance service in the amount of $205,000 per year.
Need to check on ambulance provider once or twice a month to be sure that the
equipment and personnel are meeting requirements. Also need to make sure response
times are meeting the mandates of the State of Delaware for ambulance service to our
citizens.
o Last year the ambulance service handled 6,998 emergency calls in the city which
is 19 calls per day.
Página 37
Training for National Incident Command System (NIMS) to make sure requirements are
met for the City of Dover.
Make sure shelters are prepared to handle large amounts of citizens who can be taken
care of in emergency situations.
Employees are doing double duty and this needs to be separated in order to provide the best
service to our employees and citizens.
I appreciated your consideration in this matter as we rebuild the different departments to meet
the needs of the city and out citizens.
Página 43
City of Dover
Comprehensive Annual Financial Report
Fiscal Year Ended June 30, 2011
Página 44
Introductory Section
Letter of Transmittal
Elected & Appointed Officials Commissions
Organizational Chart
Financial Section
Auditor’s Report
Management’s Discussion & Analysis
Basic Financial Statements
Required Supplementary Information
Supplementary Information
Statistical Section
Detailed Information of Financial Trends, Revenue
Capacity, Debt Capacity, Demographic and
Economic Information, and Operating Information
2
Página 45
City of Dover
Statement of Net Assets
June 30, 2011
Financial Section – CAFR Page 37
3
Página 46
City of Dover
Statement of Activities
For the Year Ended June 30, 2011
4
Página 47
City of Dover
Statement of Activities
Comparison of Fiscal Year 2010 & 2011
Management Discussion & Analysis Section – CAFR Page 27
5
Página 48
Changes in Net Assets
Governmental Activities
June 30, 2011
Governmental Activities
Governmental net assets decreased by $1.3 million. Net revenues were more than the prior year by $4.6 million.
The City Council approved a property tax rate increase of $.027 and a sanitation fee increase of $5.85 for fiscal year
2011. These two increases account for approximately $1.7 million of increased revenues. Other sources of increased
revenues over the previous fiscal year are attributed to public safety fines and fees, public safety and library grants,
transfer taxes, and Court of Chancery Fees. The revenue increases totaled $4.8 million. Revenue sources that
decreased were business licenses, permits, and investment income for a total of $.2 million.
Expenses of $37.6 million reflect an overall increase of $2.3 million from the prior year. The majority of this increase
was attributed to $2.1 million of other post-employment benefit cost. Other increases were in public safety, library and
recreation, and central services. The decreases were in general government, public works streets and sanitation, as
well as Community and economic development. Transfers to the Governmental Funds from the Proprietary Funds
increased $1.6 million.
6
Página 49
Changes in Net Assets
Business Type Activities
June 30, 2011
Business-Type Activities
The business-type activities saw a positive change in net assets of $7.4 million. The increase was a result of revenue
increases in both the water and wastewater utilities and the electric utility coupled with lower expenses in all utilities.
The water/wastewater utility had a positive change in net assets of $4.1 million. The utility experienced an increase in
operating income of $2.5 million over the previous year. The increase in operating income was due to City Council
approved rates increased for services resulting in higher charges for services of $1.3 million as well as an increase in
miscellaneous services of $1.2 million mainly attributed to increased impact fees. The utility also experienced a
decrease in personnel and operating expenses of $1.1 million. Non-operating revenue increased $.5 million as a result
of contractor contributions. There was no transfer made to the General Fund by the water/wastewater utility during
fiscal year 2011.
The electric utility realized a positive change in net assets of $3.2 million. The utility experienced an increase in
operating revenues of $1.6 million over the previous year as a result of higher kilowatt-hour sales. Operating expenses
decreased by $1.3 million due to lower power supply cost of $3.1 million and $.1 in operating expenses. The decreases
were offset by increases in postemployment retirement benefits of $1.3 million and depreciation expense of $.6 million.
Non-operating revenues and expenses reflect a negative result of $.9 million because of an increase in interest and
fiscal charges attributed to refunding bonds as explained in the Notes and a decrease in fair value of investments.
These negative results were offset by an increase in investment interest earned. Transfers to the General Fund
increased to $8.9 million from $6.8 million in the preceding year.
7
Página 51
Pension Trust Funds
Pension Plan Funding
For Fiscal Year Ending June 30, 2011
General Pension Trust Police Pension Trust
9
Página 52
Other Post Employment Benefits Trust Funding
Fiscal Year Ended June 30, 2011
Statement of Changes in Fiduciary Assets Annual OPEB Cost and Net OPEB Obligation/(Asset)
10
Página 53
City of Dover
Worker’s Compensation Fund
For the Year Ended June 30, 2011
The contributions to the
Worker’s Compensation Fund
$636,213 exceeded the claims
and administrative expenses
$290,950.
11
Página 54
City of Dover
Long-Term Liabilities for Compensated Absences & Debt
As of June 30, 2011
General Long-Term Debt
Water/Wastewater Long-Term Debt
Electric Revenue Long-Term Debt
12
Página 55
City of Dover, Delaware
Fiscal 2013 DRAFT Capital Investment Plan
FY 13 thru FY 17
PROJECTS BY DEPARTMENT
Department Project# Priority FY 13 FY 14 FY 15 FY 16 FY 17 Total
Customer Services
Customer Notification by E-IVR Automated Dialing CU1301 2 30,000 30,000
Customer Services Total 30,000 30,000
Information Technology
Server and Backup Solution Replacement IT1301 1 57,000 7,000 21,000 85,000
Information Technology Total 57,000 7,000 21,000 85,000
Public Works - Streets
Street and Alley Program
Concrete Construction and Replacement Program
ST1201
ST1202
1
2
T
1,100,000
60,000
1,300,000
70,000
1,300,000
75,000
1,300,000
80,000
5,000,000
285,000
Salt Storage Facility - Schutte Park
Silver Lake Revitalization Project
Brine Manufacturing System
Public Works - Streets Total
Public Works Admin
GIS Infrastructure and Mobile Solutions
AFST1301
ST1401
ST1501
PA1301
3
5
4
4
50,000
1,210,000
18,000
18,000
50,000
1,420,000
18,000
18,000
250,000
27,800
1,652,800
18,000
18,000
100,000
1,480,000
100,000
100,000
50,000
500,000
27,800
5,862,800
54,000
54,000
D
Public Works Admin Total
GRAND TOTAL 1,285,000 1,475,000 1,691,800 1,480,000 100,000 6,031,800
R
Thursday, April 19, 2012
Página 56
City of Dover, Delaware
Fiscal 2013 DRAFT Capital Investment Plan
FY 13 thru FY 17
FUNDING SOURCE SUMMARY
Source FY 13 FY 14 FY 15 FY 16 FY 17 Total
Community Transportation Fund 1,000,000 1,000,000 1,250,000 1,000,000 4,250,000
General Fund 285,000 475,000 441,800 430,000 50,000 1,681,800
State Grant 50,000 50,000 100,000
GRAND TOTAL 1,285,000 1,475,000 1,691,800 1,480,000 100,000 6,031,800
T
AF
DR
Thursday, April 19, 2012
Página 57
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # CU1301
Project Name Customer Notification by E-IVR Automated Dialing
Type Improvement Department Customer Services
Useful Life 5-10 years Contact Customer Service Manager
Category General Priority 2
New Project: Account Number:
Time-Line:
Description Total Project Cost: $30,000
One of the most popular and cost effective uses of IVR Technology involves automating the out-dialing process Another use is to add the feature
of customer alerts and notifications. This automation can take a variety of forms and functionality. E-IVR automated features include the ability
to broadcasting a huge number of calls to deliver a pre-recorded message or alert, targeting a specific list to be called to relay individualized
information, and to automate the dialing process as an efficient and management tool for staff. It is critical to maximize the use of
communication resources, advance with technology and offer features similar to local utilities and municipalities. Our existing phone system
provides the foundation to add beneficial enhancements.
Justification
T
The E-IVR notification system gets the word out fast for emergency notification, road closures, power outages, alerts customer of electric and
water disconnections that are scheduled due to nonpayment of utility account, upcoming events. The Customer Service department is submitting
the request for consideration. This system should benefit City departments and Officials city wide. The phone system broadcasts from our data
AF
base, when answered the IVR plays a prerecorded message. Unsuccessful calls are noted and can be broadcast again. The benefit to the customer
is to receive critical notifications and become better informed. Since the calls are automated staff, may be utilized in other functions.
Expenditures
Other
Funding Sources
Total
FY 13
FY 13
FY 14
30,000
30,000
FY 14
FY 15
FY 15
FY 16
FY 16
FY 17
FY 17
Total
30,000
30,000
Total
DR
General Fund
Budget Impact/Other
Total
30,000
30,000
30,000
30,000
Estimated annual maintenance fees. This type of notification system is already used by other utilities and municipalities in Delaware. In
conjunction with electric disconnects for nonpayment, the customer would receive an automated call two days prior to the scheduled
disconnection date. This serves as a reminder to remit the payment and allows the customer to prepare for the interruption of service in the event
payment is not received. A customer may chose to expedite payment by using the recently implemented credit card online processing system.
Thursday, April 19, 2012
Página 58
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # IT1301
Project Name Server and Backup Solution Replacement
Type Equipment Department Information Technology
Useful Life 3 - 5 Years Contact IT Director
Category General Priority 1
New Project: Account Number:
Time-Line:
Description Total Project Cost: $85,000
The City has ten (10) servers in production (excluding those that are part of the phone system). The servers were included as part of the Lifecycle
plan, and six (6) were scheduled to be replaced in Fiscal 2012. As a cost savings measure, those servers were retained and their support contract
was extended. The servers need to be replaced as scheduled in order to continue reliable service. The backup solution that has been used to back
up the servers has exceeded its capacity.
Justification
T
The continued 99.999% availability of the City’s Information Technology systems could be at risk if hardware failures occur. With increasing
age, the likelihood of a failure increases. The industry standard for server replacements is three to five years; extending past five years is a risk.
Additionally, It is no longer possible to get a complete backup on a nightly basis. The backup plan has been modified to make sure critical data
is backed up; however, it leaves the City vulnerable. In the event of a disaster recovery, some data would be lost. Aging server hardware
coupled with an inability to get a complete backup every night increases the risks exponentially. The estimated cost to replace a server is $7,000
each which includes five years maintenance. It is estimated that a replacement of the backup solution would cost approximately $15,000
including maintenance and tapes. Existing tapes will not work on a new solution.
Expenditures
Other
Funding Sources
Total
AFFY 13
57,000
57,000
FY 13
FY 14
7,000
7,000
FY 14
FY 15
21,000
21,000
FY 15
FY 16
FY 16
FY 17
FY 17
Total
85,000
85,000
Total
DR
General Fund
Budget Impact/Other
Total
57,000
57,000
7,000
7,000
21,000
21,000
85,000
85,000
Thursday, April 19, 2012
Página 59
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # ST1201
Project Name Street and Alley Program
Type Improvement Department Public Works - Streets
Useful Life 20-25 years Contact Public Services Director
Category General Priority 1
New Project: Account Number:
Time-Line:
Description Total Project Cost: $9,650,000
This project will rehabilitate approximately three to five percent (3-5%) of the street and alley network each year. The estimated capital
maintenance costs are $33.7 million over a 20-year planning horizon in Fiscal Year 2005 dollars. This estimate is based on the needs survey
conducted by Public Services in Fiscal year 2004. Continuous maintenance on these assets will prevent more costly reconstruction in the future.
This project combines the former Street Resurfacing Program, the Alley Program and the Barrier Free Access Ramp Program
Justification
T
The program identifies maintenance costs for 84.79 miles of streets and 15.24 miles of alleys as of June 30, 2010. Replacement of deteriorated
curbs, gutters, and sidewalks provides improved use, drainage, and the appearance of the pavement section. The Street and Alley Program
schedule is driven by funding and road ratings. Total street mileage is growing each as more roads and alleys are dedicated for public
maintenance due to growth.
Prior
4,650,000
Total
Prior
4,650,000
Total
Expenditures
Construction/Maintenance
Funding Sources
General Fund
Total
Community Transportation Fun
AF
FY 13
1,100,000
1,100,000
FY 13
1,000,000
100,000
FY 14
1,300,000
1,300,000
FY 14
1,000,000
300,000
FY 15
1,300,000
1,300,000
FY 15
1,000,000
300,000
FY 16
1,300,000
1,300,000
FY 16
1,000,000
300,000
FY 17
FY 17
Total
5,000,000
5,000,000
Total
4,000,000
1,000,000
D
Budget Impact/Other
R
Total 1,100,000 1,300,000 1,300,000 1,300,000 5,000,000
The improvement schedule is based on the Fiscal Year 2004 ratings and Community Transportation Funds committed by area legislators. The
annual funding split is proposed to be $700,000 from the General Fund and $1,000,000 from Community Transportation Funds in Fiscal year
2012.
NOTE: Before the issue of the General Obligation Bonds an affordability study will be conducted.
Thursday, April 19, 2012
Página 60
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # ST1202
Project Name Concrete Construction and Replacement Program
Type Maintenance Department Public Works - Streets
Useful Life 30+ years Contact Public Services Director
Category General Priority 2
New Project: No Account Number:
Time-Line: Continuous
Description Total Project Cost: $365,000
This program replaces and rehabilitates deteriorated sidewalks and curbs throughout the City using in-house labor and private contractors. This is
in accordance with the ADA. Delaying or eliminating the project will result in continued complaints and insurance claims from citizens and
visitors. In addition, further deterioration of the sidewalk network will occur.
Justification
T
This program promotes the interconnection of the sidewalk network to conform to ISTEA (Intermodal Surface Transportation Efficiency Act)
and rehabilitates sidewalks that have root damage from City street trees. This program also facilitates compliance with the Americans with
Disabilities Act as it relates to the pedestrian network as well as improving localized drainage issues.
Prior
80,000
Total
Prior
80,000
Total
Expenditures
Construction/Maintenance
Funding Sources
General Fund
Total
Total
AFFY 13
60,000
60,000
FY 13
60,000
60,000
FY 14
70,000
70,000
FY 14
70,000
70,000
FY 15
75,000
75,000
FY 15
75,000
75,000
FY 16
80,000
80,000
FY 16
80,000
80,000
FY 17
FY 17
Total
285,000
285,000
Total
285,000
285,000
D
Budget Impact/Other
There is no impact on the operating budget as reduction in insurance claims and improved pedestrian mobility is difficult to financially quantify.
R
The Department of Public Services maintains a prioritization list that outlines the categories of replacement. Complaints are entered on the list as
they are received and prioritized by City staff.
Thursday, April 19, 2012
Página 61
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # ST1301
Project Name Salt Storage Facility - Schutte Park
Type Equipment Department Public Works - Streets
Useful Life 20-25 years Contact Public Services Director
Category General Priority 3
New Project: Yes Account Number:
Time-Line:
Description Total Project Cost: $50,000
This project proposes the construction of a 50’ long x 50’ wide x 20’ high salt storage building at the rear of Schutte Park. The proposed
construction will allow city staff to store salt indoors, greatly reducing the environmental impact of this operation. Salt is only used during winter
months; however, we typically have this material on hand in varying quantities all year long.
* Wes will provide an updated quote* 2/23/2012
Justification
T
Salt is currently stored down at Old PW II under a tarp within the concrete area. The current method of covering this material is inadequate and
has potential environmental impacts on the St. Jones River. All runoff from this storage area goes directly into the St. Jones River. This project
will likely be a requirement in our NPDES MS4 permit renewal scheduled for July 1, 2011. Moving this material indoors and under roof will
reduce the environmental impact and allow this resource to be used in a more efficient manner.
Expenditures
Construction/Maintenance
Funding Sources
General Fund
Total
Total
AF
FY 13
50,000
50,000
FY 13
50,000
50,000
FY 14
FY 14
FY 15
FY 15
FY 16
FY 16
FY 17
FY 17
Total
50,000
50,000
Total
50,000
50,000
D
Budget Impact/Other
R
Thursday, April 19, 2012
Página 62
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # ST1401
Project Name Silver Lake Revitalization Project
Type Improvement Department Public Works - Streets
Useful Life 20-25 years Contact Public Services Director
Category General Priority 5
New Project: Yes Account Number:
Time-Line:
Description Total Project Cost: $600,000
The proposed project will remove all of the old pavement and parking areas and construct a new central parking lot and access to the boat ramp
area as well as access from Kings Highway. The existing pavement condition is in poor quality, and the parking pods create a public perception
problem. This project will plant trees, flowers, and shrubs below the dam on Silver Lake to Court Street along the St. Jones River in order to
improve water quality and protect the stream bank. This will be a multi-year project. The department continues to receive complaints regarding
the parking pods, the further deterioration of the existing pavement sections and parking areas, lack of stormwater management practices, bank
erosion related to stormwater runoff and, poor site lighting.
Justification
T
Currently there are no stormwater management practices being implemented on this site, and the location adjacent to the St. Jones River causes
direct stormwater discharge to an environmentally sensitive area. The proposed reconstruction and relocation of the loaded parking lot will allow
for best management practices regarding stormwater management to be implemented at this site.
Expenditures
Planning/Design
Construction/Maintenance
Miscellaneous
Total
AFFY 13 FY 14
50,000
50,000
FY 15
250,000
250,000
FY 16
100,000
100,000
FY 17
100,000
100,000
Total
50,000
250,000
200,000
500,000
Future
100,000
Total
DR
Funding Sources
Community Transportation Fun
General Fund
State Grant
Budget Impact/Other
Total
FY 13 FY 14
50,000
50,000
FY 15
250,000
250,000
FY 16
50,000
50,000
100,000
FY 17
50,000
50,000
100,000
Total
250,000
150,000
100,000
500,000
Future
100,000
Total
The proposed project includes parking reconstruction, planning and design, and ultimately landscaping for this section of the St. Jones River.
Thursday, April 19, 2012
Página 63
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # ST1501
Project Name Brine Manufacturing System
Type Equipment Department Public Works - Streets
Useful Life 10-15 years Contact Public Services Director
Category General Priority 4
New Project: Account Number:
Time-Line:
Description Total Project Cost: $27,800
The ABS-1500 automatic batch system is designed for the manufacturing of a brine solution continuously. The brine solution is produced from a
mixture of granular salt and standard tap water. The system can produce up to 4,000 gal of brine per hour.
The ABS-1500 - $11,550; a 5,000 gallon heavy duty storage tank - $3,675 and the Single lane EZ load applicator system - $12,600
Justification
Waiting to receive updated information from Scott Koenig. (hf 2/23/2011)
T
Expenditures
Equip/Vehicle/Furnishings
Funding Sources
General Fund
Total
Total
AF
FY 13
FY 13
FY 14
FY 14
FY 15
27,800
27,800
FY 15
27,800
27,800
FY 16
FY 16
FY 17
FY 17
Total
27,800
27,800
Total
27,800
27,800
D
Budget Impact/Other
R
Thursday, April 19, 2012
Página 64
Fiscal 2013 DRAFT Capital Investment Pla FY 13 thru FY 17
City of Dover, Delaware
Project # PA1301
Project Name GIS Infrastructure and Mobile Solutions
Type Equipment Department Public Works Admin
Useful Life 3-5 years Contact Public Services Director
Category General Priority 4
New Project: No Account Number:
Time-Line:
Description Total Project Cost: $54,000
This project will be used to expand mobile data terminals (MDT's) to building inspectors and the Public Works inspector. The ability will be
given to access all networked files and programs (HTE, Fortis, Outlook, etc.) along with utilization of many GIS capabilities. The Fire Marshal's
office along with Code Enforcememt staff have this capability and it has been beneficial for both departments.
Justification
T
This strategy would procure hardware and software as well as perform pilot projects that would test the ability of the City to expand in such areas
of technology. The types of hardware to be purchased are GPS receivers, patch antennas, laptops, vehicle mounts, and lightweight clients.
Software would be extensions used in conjunction with ESRI’s ArcGIS software to perform specific tasks. Types of extensions are spatial
analyst, network analyst, etc. ESRI Services may be purchased for help with advancement in the City’s use of ArcGIS Server Mobile.
Expenditures
Other
Miscellaneous
Funding Sources
General Fund
Total AFFY 13
8,000
10,000
18,000
FY 13
18,000
18,000
FY 14
8,000
10,000
18,000
FY 14
18,000
18,000
FY 15
8,000
10,000
18,000
FY 15
18,000
18,000
FY 16
FY 16
FY 17
FY 17
Total
24,000
30,000
54,000
Total
54,000
54,000
D
Budget Impact/Other
R
Total
As pilot projects are preformed and found to be successful, budgets will grow as the pilots are implemented department or City-wide. Future
software maintenance and hardware replacement (sustainability). The City is using two NASCAR races a year to implement new technologies.
Along with training employees in these technologies, we are utilizing techniques used in damage assessment and emergency recovery during
daily race weekend operations. To continue expanding on such pilot projects, we would need additional hardware and software. Other below
represents ESRI services and support. Miscellaneous below represents mostly hardware and some software.
Thursday, April 19, 2012
Página 65
City of Dover, Delaware
Fiscal 2013 DRAFT Capital Investment Plan
FY 13 thru FY 17
PROJECTS BY DEPARTMENT
Department Project# Priority FY 13 FY 14 FY 15 FY 16 FY 17 Total
Facilities Management
1996 Dodge B2500 (438) 14Veh# 438 n/a 16,096 16,096
1996 Ford E350 (436) 15Veh# 436 n/a 16,096 16,096
1999 Dodge RMV Van (435) 16Veh# 435 n/a 16,096 16,096
Facilities Management Total 16,096 16,096 16,096 48,288
Life Safety (Fire Marshal)
20' Express Wagon with Honda Generator 14Veh# 14 1 17,500 17,500
Life Safety (Fire Marshal) Total
Permtting and Inspections
T 17,500 17,500
2001 Dodge Pick Up (19)
2002 Dodge Pick Up (18)
2001 Dodge Pick Up (22)
2001 Dodge Pick Up Truck (20)
Planning
Permtting and Inspections Total
2009 Chevy Uplander
AF
14Veh# 19
15Veh# 18
16Veh# 22
17Veh# 20
14Veh# 3
2
3
3
1
n/a
16,000
16,000
16,177
16,000
16,000
16,000
16,000
16,500
16,500
16,000
16,000
16,000
16,500
64,500
16,177
D
Public Works - Grounds
R
1995 Ford Crew Cab Dump Truck (552)
2002 Toro Wing Mower (562)
2002 Dodge Pick Up (550)
2001 Dodge Pick Up (553)
1999 Dodge Pick Up (558)
1999 Chevy Dump Truck (554)
Planning Total
13Veh# 552
13Veh# 562
14Veh# 550
14Veh# 553
14Veh# 558
15Veh# 554
5
2
3
2
2
3
47,000
65,000
16,177
17,000
17,000
17,000
54,491
16,177
47,000
65,000
17,000
17,000
17,000
54,491
1998 Vermeer Stump Grinder (566) 15Veh# 566 3 44,000 44,000
1998 X-Mark Mower (568) 15Veh# 568 3 14,310 14,310
2001 Kubota Tractor (569) 15Veh# 569 3 29,116 29,116
1998 Chevy Crew Cab Dump Truck (551) 16Veh# 551 4 58,962 58,962
2006 X-Mark Mower (573) 16Veh# 573 4 15,456 15,456
1991 International Utility Trailer (578) 16Veh# 578 4 14,000 14,000
2002 Bean 300 Gallon Sprayer (585) 16Veh# 585 4 22,122 22,122
1990 FMC 300 Gallon Sprayer (565) 17Veh# 565 5 23,760 23,760
1999 Bandit Chipper (579) 17Veh# 579 5 46,122 46,122
1994 Vermeer Chipper (588) 17Veh# 588 5 46,000 46,000
Public Works - Grounds Total 112,000 51,000 141,917 110,540 115,882 531,339
Public Works - Sanitation
2004 Peterbilt Automated Trash Truck (442) 13Veh# 442 2 253,000 253,000
Thursday, April 19, 2012
Página 66
Department Project# Priority FY 13 FY 14 FY 15 FY 16 FY 17 Total
2003 Peterbilt 320 Automated Trash Truck (444) 13Veh# 444 1 253,000 253,000
2004 Peterbilt Automated Trash Truck (443) 14Veh# 443 2 253,875 253,875
2002 Int'l Rear Loader (449) 14Veh# 449 2 129,375 129,375
2003 Peterbilt 320 Automated Trash Truck (450) 14Veh# 450 1 246,075 246,075
2008 Peterbilt Automated Trash Truck (441) 15Veh# 441 3 296,075 296,075
2002 Hurst Trailer (453) 15Veh# 453 3 14,500 14,500
2008 Intn't Rear Loader (445) 16Veh# 445 4 165,975 165,975
2008 Peterbilt Side Loader (451) 16Veh# 451 4 296,075 296,075
Public Works - Sanitation Total 506,000 629,325 310,575 462,050 1,907,950
Public Works - Streets
1992 International Dumpt Truck (328) 13Veh# 328 1 130,600 130,600
1986 Case Backhoe (319) 14Veh# 319 2 94,075 94,075
2001 Int'l Dump Truck (322) 14Veh# 322 2 123,275 123,275
2001 Int'l Dump Truck (324) 14Veh# 324 2 133,074 133,074
1999 Dodge Pick Up Truck (330) 14Veh# 330 2 19,500 19,500
2001 Dodge Pick Up Truck (331) 14Veh# 331 2 19,500 19,500
1992 Int'l Leaf Truck (366) 14Veh# 366 2 110,000 110,000
2002 Airman Air Compressor (382)
2001 Case Front-End Loader (312)
2002 Case Front-End Loader (316)
2001 Int'l Dump Truck (321)
14Veh# 382
15Veh# 312
15Veh# 316
15Veh# 321
2
3
3
3
T 23,000
129,700
129,700
115,075
23,000
129,700
129,700
115,075
2001 Dodge Utility Truck (345)
1986 Hudson Trailer (394)
2006 Ford 1-Ton Dump Truck (325)
2002 ODB Leaf Vacuum Trailer (361)
2006 Int'l Sweeper (361)
Tax Assessor
Public Works - Streets Total
AF
15Veh# 345
15Veh# 394
16Veh# 325
16Veh# 361
17Veh# 356
3
3
4
4
4
130,600 522,424
46,875
15,000
58,395
494,745
42,120
42,120
195,075
195,075
46,875
15,000
58,395
42,120
195,075
1,384,964
D
2002 Dodge Stratus
R
Tax Assessor Total
GRAND TOTAL
14Veh# 4 2
748,600
20,000
20,000
1,288,522 979,333 646,806 327,457
20,000
20,000
3,990,718
Thursday, April 19, 2012
Página 67
ACTION FORM
PROCEEDING: Legislative, Finance, and Administration Committee
DEPARTMENT OF ORIGIN: City Manager’s Office DATE SUBMITTED: April 16, 2012
PREPARED BY: Scott D. Koenig, P.E., City Manager
SUBJECT: Proposed Land Lease Agreement - Boys and Girls Club
REFERENCE: N/A
RELATED PROJECT: Wyoming Mill Road Realignment Project
REVIEWED BY: Donna Mitchell, Controller
EXHIBITS: Boundary Survey – Schutte Park Addition; Potential Site Layout – Boys and Girls Club
EXPENDITURE REQUIRED: N/A AMOUNT BUDGETED: N/A
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
TIME TIMETABLE: N/A
RECOMMENDED ACTION: Authorize the City Manager to negotiate and execute a lease agreement with the Boys
and Girls Club for land at the corner of Hazlettville Road and Wyoming Mill Road, on which the Boys and Girls Club
will construct a new Boys and Girls Club facility.
BACKGROUND AND ANALYSIS
The Boys and Girls Club approached the City of Dover several years ago about the potential of locating a new magnet
facility in Schutte Park. The area under discussion has been a triangle-shaped piece of land that was donated to the City of
Dover by Stover Homes with the subdivision of Nottingham Meadows, bounded by the rights-of-way for the new
Wyoming Mill Road alignment and the former Wyoming Mill Road alignment.
On January 14, 2008, following the recommendation of the Parks, Recreation and Community Enhancement Committee,
City Council approved the following motion:
Mr. McGiffin moved for approval of Schutte Park to be used as the location for the magnet
site for the Boys & Girls Club, without being specific to its location at Schutte Park, and the
stipulation that its use will not cause any current loss in field space for the CDSA, seconded
by Mr. Hogan and carried by a unanimous roll call vote (Mr. Leary absent).
Since this time, the Boys and Girls Club has been working on fundraising and planning for the development of this site.
They have provided periodic updates to the Parks, Recreation and Community Enhancement Committee. With the
construction and opening of the new alignment of Wyoming Mill Road, the Boys and Girls Club is preparing for
submission of a Site Development Plan application to the City of Dover Planning Commission. In order for this
application to move forward, the City Manager will need to sign the application as the property owner. In addition, the
City of Dover also needs to be prepared to enter into a long-term land lease agreement with the Boys and Girls Club.
The Boys and Girls Club is in the process of developing a site layout, which will largely be driven by the requirements of
DelDOT with regard to entrance location. One potential layout of the proposed site is attached, along with a boundary
survey of the land parcel in question. Staff is requesting that City Council authorize the City Manager to negotiate and
execute a land lease that will take into account the various site constraints, including the entrance location and impact of
the Source Water Protection Overlay Zone on the site. It is anticipated that once the right-of-way of the former alignment
of Wyoming Mill Road is vacated, lot lines will be adjusted so that the Boys and Girls Club facility is on a separate lot
than the remainder of Schutte Park.
Página 69
x
x R
E
T
A
W
"
0
x 1
.
X
E
x
x
.E
x . U A R C H IT E C T U R E
x .E
E N G IN E E R IN G
.
) U
41
D T Dover, DE
5+
00
PC
=4
15
A O CONCEPT DESIGN PLAN
+0
3.
98
E
L
R 309 S Governors Ave
Dover, DE 19904
D O 302.734.7950
D
I Y NOT FOR PUBLIC DISTRIBUTION Salisbury, MD
L B 312 West Main St. Suite 300
L Salisbury, MD 21801
E 410.546.9100
M D Wilmington, NC
N
G O 3205 Randall Parkway, Suite 211
D Wilmington, NC 28403
IN N
A
910.341.7600
M B www.beckermorgan.com
T A
O E
Y B BAKER, INGRAM & ASSOCIATES
EX T
W
( D
41
.T
CONSULTING STRUCTURAL
4+ .
EL 00
F ENGINEERS
.M T
E
X O 1050 SOUTH STATE STREET
.
1
.5
"
L DOVER, DELAWARE 19901
(302) 734-7400 FAX: (302) 734-7592
.
F
.M
O
AT E
EX
X
ER . BLAKE & VAUGHAN
.G
6
" ENGINEERING, INC.
C.
W
AS
EX .E MECHANICAL AND ELECTRICAL
.
.1 ENGINEERS
R.
U
0" .E
. TROLLEY SQUARE SUITE 24C
U
EX WILMINGTON, DELAWARE 19806
.6
73
(302) 888-1780 FAX: (302) 888-1781
"F
.M.
F.
H.
-
41
3+
AD 00
x
x
RO
W
E
x X
x .
1
0
"
VI
x x
x
x
x LL PRELIMINARY
E DESIGN CONCEPT ONLY
SUBJECT TO
FURTHER REVISIONS
TE NOT FOR CONSTRUCTION
NOT FOR PERMITS
41
2+
ZL
ISSUED: 03/06/12
00
ET
.E
HA
. U
.
E
. U
12 12
12
12
FUTURE "PARK"
PARCEL/LEASE AREA 4.00- ACRES PARKING (103)
41 PROJECT TITLE
1+ 3
00 12 12
BOYS & GIRLS
.
F
.M
CLUB
12 E
PT X
=4 .
1
HAZLETTVILLE & WYOMING
10 .5
+7
0.
" MILL ROADS
36 STORAGE
.
520 SF
F
.M
DOVER, DELAWARE
E
X
(
100 SEATS)
.
12 12 6 T BOYS & GIRLS CLUBS
12 12 " E
EX 7 R
A OF DELAWARE
.T EX W
.G
FUTURE ADDITION
E
EL
(10,000 SF)
MALE X
.
AS
LOCKER
ROOM 1
370 SF
GYMNASIUM
0
4,551 SF (PHASE 3)
" .
E
. U
.E
.
U
GYMNASIUM
FEMALE 4,550 SF (PHASE 1)
9,101 S.F.
410
LOCKER
607 OCC. AT 15 S.F. (ASSEMBLY - UNCONCENTRATED - TABLES AND CHAIRS)
ROOM
1,300 OCC. AT 7 S.F. (ASSEMBLY - CONCENTRATED - CHAIRS ONLY - NOT FIXED)
370 SF
+00
1,820 OCC. AT 5 S.F. (ASSEMBLY - STANDING SPACE)
FC
M
(
100 SEATS) STORAGE STORAGE STORAGE
140 SF 100 SF 100 SF STORAGE
MULTI-PURPOSE ROOM 150 SF
2,000 SF
134 OCC. AT 15 S.F.
(ASSEMBLY - UNCONCENTRATED -
T T TABLES AND CHAIRS)
PRE-SCHOOL CARE SCHOOL-AGE DANCE / MUSIC MULTI-PURPOSE
CLASSROOM 1 CLASSROOM 2 ROOM 5 ROOM 6
1,050 SF 1,050 SF 934 SF 1,050 SF
T
T
CATERING 27 OCC. AT 35 S.F. (DAY CARE)
F.
KITCHEN
30 OCC. AT 35 S.F. (DAY CARE) 30 OCC. AT 35 S.F. (DAY CARE) 30 OCC. AT 35 S.F. (DAY CARE)
260 SF
.
H.
12
12 STORAGE V.
110 SF
STORAGE
100 SF
W
30 30 30
VENDING
30
80 SF STORAGE
SHEET TITLE
.
2,177 S.F. E
X
RES
145 OCC. AT 15 S.F. (ASSEMBLY - UNCONCENTRATED -
.
NG OF CURRENT
CORRIDOR
GAME ROOM TABLES AND CHAIRS)
1
1,070 SF 435 OCC. AT 5 S.F. (ASSEMBLY STANDING SPACE) 12 .5
8 "
F
SITE PLAN
23 OCC. AT 50 S.F. (EXERCISE ROOMS)
STORAGE STORAGE
MALE
30 30 30
.M
NNI
BEG I
TRI LI
CLO STORAGE STORAGE
SITE PLAN
80 SF 80 SF
NE /
SCHOOL-AGE
INV.=48.75 ROOM 7
CTI
ACTIVITIES ROOM SCHOOL-AGE SCHOOL-AGE
1,050 SF
1
CLO
2,177 SF ROOM 3 ROOM 4
FEMALE 1,050 SF 1,050 SF
STAFF
T T
TOILET
R.
OFFICE
SCALE: 1" = 30’0"
ON L
STAFF
12 12
BREAK ROOM
12 12
O.
IT ROOM T
COMPUTER 30 OCC. AT 35 S.F. (DAY CARE)
P
1,538 S.F. 90 SF PLAYGROUND
15 OCC. AT 100 S.F. (BUSINESS) ROOM 30 OCC. AT 35 S.F. (DAY CARE)
MECH RM 30 OCC. AT 35 S.F. (DAY CARE)
W.
EX.
500 SF
360 SF
34 OCC. AT 15 S.F.
390 S.F.
I
(ASSEMBLY - UNCONCENTRATED -
409+
NE
26 OCC. AT 15 S.F. WORK ROOM SPRINLER
TABLES AND CHAIRS) STORAGE
(ASSEMBLY - ROOM
18"
OPEN OFFICE
100 SF 80 SF
UNCONCENTRATED - 670 SF
00
TABLES AND CHAIRS)
RC
LOBBY / TEEN ROOM
CONFERENCE
CHECK-IN 402 SF
ROOM FIRST FLOOR PLAN
GHT TURN LANE
390 SF OFFICE 24 OCC. AT 15 S.F. 30,080 SF
(ASSEMBLY - UNCONCENTRATED -
PRO
TABLES AND CHAIRS)
RI
BUI
VEST
6
PER
LDI
INV.=49.02
NG TY
11
7
ST
O
M A RM W
PARKING (184)
FC
TION I
NT AT
M 240’ 182’PAVEMENT ADDI
EN E
AN R M
6
12
6 5 17 Y.
5 S.
AN
12
CE
0’ 15’ 30’ 60’
AG
EA
EM
SCALE : 1"=30’0"
24’ 210’ 50’ SE
50’ 50’ 30’ EN
408+00
245’ ME
APER
FC GHT T
RI URN LANE TAPER
GHT T
RI URN LANE T
NT T 03/06/12
M ISSUE BLOCK
F:
\V8\
Proj
ect
s\2011\
201110300\
dgn\
201110300-
plan-
pref
ered-
W JS.
dgn
12’
72
PC = 313+84.
PT = 318+79.
21
5’
12’
312+00 311+00
PC=407+303
.4 313+00 X XX/XX/XX XXXX
314+00
94
12’
PT = 311+74.
315+00 MARK DATE DESCRIPTION
320+70.21 320+00 319+00 317+00 316+00
318+00
PROJECT NO: 2011103.00
R.195
LL ROAD -C.
NG MI
WYOMI DATE: 11/02/11
407+00
SCALE: 1 " = 30’0"
DRAWN BY: WJS PROJ MGR: WJS
405’TAPER
FC ST PI
RI NG PER DELDOT CONTRACT:300
-420
-2 160’ 02/07/12 C100
3/
6/2012
M
LEFTTURN LANE COPYRIGHT' 2010
Página 70
ACTION FORM
PROCEEDING: Legislative, Finance and Administration Committee
DEPARTMENT OF ORIGIN: Parks, Recreation & Library DATE SUBMITTED: 4/19/12
PREPARED BY: Margery K. Cyr
SUBJECT: Reading Garden / New Library
REFERENCE: New Library
RELATED PROJECT: N/A
REVIEWED BY: City Manager and Controller
EXHIBITS: Reading Garden
EXPENDITURE REQUIRED: $123,000 AMOUNT BUDGETED:
FUNDING SOURCE (Dept./Page in CIP & Budget): Parks, Recreation & Library CIP page 15
TIMETABLE: Work to begin in early May
RECOMMENDED ACTION: Staff recommends City Council approval of the reinstatement of the Reading
Garden to the new Library building project.
BACKGROUND AND ANALYSIS
On February 28, 2011, Council approved the EDiS contract for the construction of the new Dover Public
Library with the following language:
“If there are apparent savings during the construction, the City Manager may reinstate options to construct some
features that have been removed from the project through value engineering and present them to City Council
for approval.”
Ground was broken on the new Dover Public Library in April 2011. Site work begins this week. During the
value engineering process, the Reading Garden was removed from the project.
Economies have been found in the Moveable, Fixed Equipment, and contingency budgets of the project which
provide adequate funding to allow for the reinstatement of the Reading Garden into the building project. The
cost of the Reading Garden will be $123,000. This will be funded through the savings found in Equipment and
contingency budgets.
There will be no increase in the total project cost.
Staff recommends the Reading Garden be reinstated in the new Library project.