BP 2018 February Meeting Packet (draft)
Safety Advisory and Transportation Committee. 6 de febrero de 2018.
Este texto se extrajo de el PDF de forma automática y puede contener errores. El PDF es el registro oficial, así que consúltelo antes de confiar en esto.
Página 1
Bicycle/Pedestrian Subcommittee
Tuesday, February 6, 2018
5:00 PM – 6:00 PM
Large Conference Room – Dover City Hall
DRAFT AGENDA
Agenda
Meeting Minutes of November 2017
Old Items:
1. Dover Treasure Hunt
2. Construction Projects (DelDOT)
Senator Bikeway
West Street Multiuse Path
Other pertinent construction projects
3. Bike Fix‐it Station
4. Bike Month Events (Bike to Work day, Ride of Silence)
5. Dover Duathlon – April 14, 2018
New Items
1. Bicycle Friendly Report Card
2. Independence Blvd Traffic Control Measures
Announcements
Adjournment
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C.
§10004(E)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS,
INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING.
Página 2
Bicycle Pedestrian Sub‐Committee
Dover City Hall Large Conference Room
Dover, DE
November 7, 2017
***DRAFT***
Members Present: Others Present:
Chris Asay, Jayce Lesniewski, Carolyn Courtney, John Fiori, Kate Layton,
Fran Riddle, Andy Siegel Mike Saylor, Stephanie Rolsal (Wilm U Student)
CALLED TO ORDER: Meeting opened at 5:00 P.M.
AGENDA
The agenda was presented for review. With no changes the agenda was accepted as presented.
APPROVAL MEETING MINUTES
Mr. Asay noted Mr. Aglio did updates on various bike projects. He then noted the following: the West Street project will
probably start construction in the early Spring 2018, the Brecknock Park project was out for bid and might be constructed
in the Spring of 2018. Also mentioned that the RT 13 expansion he was advocating for bike path on both sides of RT13
from punch and run all the way to Polytech. He expected North Street will be repaved in the Fall of 2017 and the Senator
Bikeway was to would go out for bid late this fall and construction could happen next fall of 2018. Currently, do not have
design funding for Phase 2 of the Senator Bikeway and also said as part of Phase 1, adding sharrows along Fulton Street.
The motion was made to approve the October Minutes as amended. This motion passed without objection.
RCD GRANT: BIKE FIX IT STATION
Mrs. Layton noted Restoring Central Dover (RCD) has another round of grants out for this year. $35,000 was divided into
smaller grants within the working groups of RCD. The Green Space working group applied for a Bike Fit It station outside
of the Library. We applied for the station and concrete pad for installation. Now, we are looking to do the next steps.
Fielding a question, Mrs. Layton explained that a fit it station is a compact structure that one could do bike repairs. One
would put their bike on the station and possibly tighten a spoke or brake line for example. She added that much
discussion went into the style of fix it station, one with retractable tools verses those that would hang. Some discussion
took place on other locations in Dover that may have these fix it stations. There is one behind DelDOT, on the C&D Canal
trail (New Castle), one on the St. Jones trail, Lewes Library, and Breakwater Junction trail were some quickly named
places.
Mr. Asay thought DogFish Head had a granting opportunity for bike fit it stations in Dover. He felt Mr. Aglio had reported
on this some months ago. Mr. Asay asked Mr. Fiori to double check with Mr. Aglio if DogFish Head is offering grants for
biking projects.
It would most likely be installed in the spring, as we need to order the station and coordinate with the City for
installation.
AMERICA WALKS GRANT PROJECT
Ms. Courtney shared information on a grant opportunity of $1,500 for a walk friendly activity. We are applying for the
Dover Treasure Hunt project. This is a community challenge grant to promote walking. This is a nice tie into the program
that Mrs. Riddle had previously shared with us from the Walk Friendly Report card follow up. We are looking to get some
Página 3
partners on board to make this happen. This will be a “treasure hunt” kind of event that encourages walking. Mrs.
Riddle noted getting a working group together and bringing together a group of varied folks to make this work, such as
the Capital School District, BayHealth, Eden Hill, Wesley, Downtown Merchants, Caesar Rodney School District, Arts and
Cultural Centers, etc. These are a sample of logical partners. We were thinking anyone that would be on the routes of the
treasure hunt would be a potential partner. The grant response is expected in December. We are very early in the
planning stages. We would most likely start with a planning group and then consider piggybacking off of another event.
OLD BUSINESS ITEMS
Senator Bikeway Update
Mr. Fiori noted not much has changed since last month, still finalizing the plans. They did meet with Bennie Smith
Funeral representatives about losing the parking in front of the business. They did not seem concerned with losing this.
We were concerned they would be upset, but they did not oppose the project as they noted the parking in the back of
their facility that is used by their customers and staff. They cane line precessions up on Ridgley Street verses Division
Street.
In the next couple weeks, we are sending out right of way easement agreements to be signed off by property owners.
Hopefully, they will be returned in a short timely manner. Jeff Niezgoda and Anthony Aglio met with Jason Lyon on the
maintenance on the cycle track, particularly the green paint. Mr. Lyon would go back and check and get back with an
answer on the maintenance detail. Mr. Siegel, asked about the auto dealer across the street from Bennie Smith, as he
felt they will have issue with not being able to park their cars on Division Street. Brief discussion took place on the car
repair/dealer on the south side of Forest Ave in this section of discussion.
Mr. Asay asked about the railroad crossing and potential for crossing. He felt Mr. Aglio mentioned there was an issue.
Mr. Fiori noted a separate arm would be required for crossing the tracks at Division, however this was not the issue on
North Street as the arm is long enough.
The question was asked about the difference of a bike lane and bike path. Bike Lane is on the street and a bike path is on
the other side of the curb not connected to the street. A bike path is usually a multiuse paved path to be used by
multimodal means of transportation.
Educational Partnerships
Mr. Aglio noted in discussion with Mr. Saylor, we are going to do additional bike rodeos this school year. We have
divided them up as three this fall and three in the spring. We have two scheduled, tomorrow is Booker T and Thursday is
Hartly Elementary. We are again targeting the fourth grade classes. He is set up ready to go and has some volunteers
ready to go, this include DelDOT staff and bike/ped members. North Dover (in April) was a success and we anticipate the
same for these.
Mr. Saylor stated we can’t thank you enough for all the work that goes into setting this up. Once the teachers brought
the kids outside, the volunteers took over. We had students that had never rode a bike and this was an experience they
won’t forget. We very much welcome this program.
Mrs. Riddle noted she had heard of a bike rodeo with Dover Police and the Elks. Mrs. Courtney noted it was the Dover
Elks Lodge 1903 hosting the event with Dover Police and Parks & Recreation as a partners. This was their second rodeo at
for the Elks. They had received a grant through their national foundation. The grant purchased 15 bicycles, helmets, bike
accessories, and provided a healthy lunch for participants & their families. As well, DelDOT (Mr. Fiori) donated light sets
for each of the bikes and the rodeo course supplies. Dover Police had a six bicycles they gave away as prizes. About 50
children participated on the rodeo course all together
Página 4
Mr. Asay noted this is what they did the year before last. Are they looking to do another in 2018? Mrs. Courtney replied
she believed that would likely happen.
Walk Friendly Report Card Discussion
Covered earlier in the RCD Grant discussion.
Delaware Bike Council Grant Update
Ms. Courtney reported city officials (Kirby Hudson, Asst. City Manager, Sharon Duca, Public Works Director, Margery Cyr,
Parks & Rec Director, Eddie Diaz, City Planner along with myself) and James Galvin of the MPO met with Bike Council
members (Mr. Fiori, James Wilson, Fran <last name>) met onsite. We took a brief tour of College Road. Fran noted she
rode that area frequently and understood the need for a path. They asked us questions on the scope of work and funding
for the project. It was thought the price tag for this project would be upwards of $50,000. The MPO agreed to assist us in
funding the uncovered should we move forward as well we would partner with them using their contractors for this
project. The city has no money budgeted for this project. Mr. Asay asked if the Council would choose their winners in
December? Mr. Fiori responded, yes. Mr. Asay we are finally asking for what you wanted to see. Mr. Fiori noted the cities
are taking this seriously and submitting quality projects.
ANNOUNCEMENTS
Mr. Siegel asked if we had heard back on the Bike Friendly Application? Ms. Courtney noted it should be coming up soon,
that as of yet we had not heard.
Mr. Siegel noted Delaware dropped to #7 Bike Friendly State. Basic discussion included the state competition had gotten
better, our bike plan had not been approved by the time this was submitted. We have very few “commuter” riders and
that hurts us. We are going to do a pilot program at DelDOT and then expand out to companies, City of Dover for
example to answer the survey as to why they don’t ride to work, is it not safe, is it due to other demands of the commute,
lack of dressing/locker room, distances, etc. We won’t have a solution until we investigating and determine the issues.
We’ll start small and then hopefully expand out to the county and state wide. Colorado finished #6, our former Secretary
of Transportation is now in Colorado, he did call Sec. Cohen to share a few words.
Mrs. Layton noted a new executive director of the MPO, Reed McMillian who started Oct. 30. He comes from New Castle
County planning and years ago he did work for Kent County Planning, he has history in Maryland a strong military
background of 30 years. He is being very thorough and accessing where we are now. He does live in Middletown. She
will invited him to join us at future meetings.
ADJOURNMENT
With no further business the meeting adjourned at 5:53 PM without objection.
Página 5
DOVER, DE
Fall 2017
TOTAL POPULATION POPULATION DENSITY # OF LOCAL BICYCLE
FRIENDLY BUSINESSES
1
36,826 1,581
TOTAL AREA (sq. miles)
# OF LOCAL BICYCLE
23.3 FRIENDLY UNIVERSITIES 0
10 BUILDING BLOCKS OF
A BICYCLE FRIENDLY COMMUNITY Average Silver Dover CATEGORY SCORES
ENGINEERING
High Speed Roads with Bike Facilities 40% 28%
Bicycle network and connectivity 2. 3 /1 0
EDUCATION
Total Bicycle Network Mileage
47% 21% Motorist awareness and bicycling skills 3. 8 /1 0
to Total Road Network Mileage
ENCOURAGEMENT
Mainstreaming bicycling culture 4.0 /1 0
Bicycle Education in Schools GOOD ACCEPTABLE
ENFORCEMENT
Promoting safety and protecting bicyclists' rights 4.4 /1 0
Share of Transportation Budget
11% UNKNOWN
Spent on Bicycling EVALUATION & PLANNING
Setting targets and having a plan 4.4 /1 0
Bike Month and
GOOD AVERAGE
Bike to Work Events
Active Bicycle Advocacy Group YES YES
KEY OUTCOMES Average Silver Dover
MONTHLY OR
Active Bicycle Advisory Committee
MEETS EVERY
MORE FRE- RIDERSHIP 2.6% 0.64%
TWO MONTHS Percentage of Commuters who bike
QUENTLY
SAFETY MEASURES
Bicycle–Friendly Laws & Ordinances SOME GOOD CRASHES 549 330.1
Crashes per 10k bicycle commuters
SAFETY MEASURES
Bike Plan is Current and is Being
YES YES FATALITIES 7.3 194.2
Implemented Fatalities per 10k bicycle commuters
Bike Program Staff to Population 1 PER 91K 1 PER 61K
KEY STEPS TO SILVER
» Continue to increase the amount of high quality bicycle » Dover has a limited bicycle network. Based on the data
parking throughout the community. Ensure that people arriving provided it is unlikely that it provides a low-stress experience
by bicycle have a secure and legal place to lock their bikes at suitable for people of all ages and abilities. Ensure that there is
popular destinations through the use of bike corrals, bike valets, a plan for continual improvement with the goal of creating a
and incentives or requirements for bike parking in buildings. safe and comfortable bicycle network for people of all ages and
abilities.
» Improve Bike Month activities by creating a Bike to School
Day event. Bike to School Day events can include competitions
related to bicycle use, outreach to parents, and coordination
between the schools and the city to create safer routes to
schools.
LEARN MORE » WWW.BIKELEAGUE.ORG/COMMUNITIES SUPPORTED BY AND LEAGUE MEMBERS