COUNCIL COMMITTEE OF THE WHOLE
The Council Committee of the Whole met on March 27, 2018 at 6:00 p.m., with Council President
Slavin presiding (departed at 6:45 p.m. and returned at 6:47 p.m.). Members of Council present
were Mr. Anderson (departed at 7:13 p.m. and returned at 7:15 p.m.), Mr. Sudler (arrived at 6:02
p.m.), Mr. Neil, Mr. Lewis (departed at 7:11 p.m. and returned at 7:13 p.m.), Mr. Cole (departed at
6:47 p.m. and returned at 6:48 p.m.), Mr. Polce (arrived at 6:04 p.m., departed at 7:02 p.m., returned
at 7:04 p.m., departed at 7:52 p.m., and returned at 7:53p.m.), and Mr. Hare. Mr. Lindell was absent.
Mayor Christiansen was also present (departed at 7:49 p.m.). Civilian members present for their
Committee meetings were Mr. Garfinkel and Mr. Shelton (Safety Advisory and Transportation),
Mrs. Doyle and Ms. Scarborough (Utility), and Mr. Shevock and Dr. Stewart (Legislative, Finance,
and Administration).
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
The Safety Advisory and Transportation Committee met with Chairman Lewis presiding.
AGENDA ADDITIONS/DELETIONS
Mr. Neil moved for approval of the agenda, seconded by Mr. Cole and unanimously carried.
Presentation by the Dover/Kent County Metropolitan Planning Organization (MPO) - Final
Report of the Downtown Dover Parking Study
Mr. James Galvin, Principal Planner, Dover/Kent County Metropolitan Planning Organization
(MPO), advised that completing the parking study had been a two-year process. He stated that it
was a very involved process and he thought that they had come up with a good product.
Mr. Spencer Finch, Project Manager and Sustainability Leader, Langan Engineering &
Environmental Services, Inc., reviewed a presentation entitled “Downtown Dover Parking Study”,
dated March 27, 2018, (Attachment #1). Referring to slide 32, Potential On-Street Parking Zone,
he indicated that Loockerman Street, Zone 1, should probably have the highest parking rates because
it is the prime real estate directly in front of the retail and most destinations. Mr. Finch explained
that the blue areas, Zone 2, are the side streets which would provide slightly cheaper parking, and
then the green areas, Zone 3, would be areas that are protected for residential. He stated that the
Zone 3 areas would have no cost but there would need to be some caretaking to make sure that
residents have those parking spots near the residential locations.
Mr. Polce thanked Mr. Finch for providing members with a very thorough presentation. He
expressed concern regarding the public survey, noting that six (6) to eight (8) responses was not a
statistically sound sample size. Mr. Polce asked Mr. Finch to explain the methodology used to
engage the public and gather feedback. Responding, Mr. Finch noted that they were disappointed
in the response they received to the electronic survey as well. He advised that they held three (3)
public meetings and the records of those meetings were also included in the report. Mr. Finch stated
that, on average, there were typically between 20 - 40 people in attendance at those meeting and he
thought that they did the best job they could in trying to reach out to as many people as they could.
He advised that this was in addition to the stakeholder engagement that they did, noting that they
reached out to every business within the project area, and others outside as well.
Página 2
COUNCIL COMMITTEE OF THE WHOLE MEETING OF MARCH 27, 2018 PAGE 2
Mr. Anderson thanked Mr. Finch for the study and asked how he reconciles the idea that there is not
a parking problem if there are 16% violations during the peak of the day, explaining that he thought
that this indicated that there was a problem with parking in the areas where people want to be. In
response, Mr. Finch clarified that the 16% violation was an issue that they spotted related to the
parking surfers, explaining that at least 16% of the people parking on peak hours are exceeding the
two-hour limits or parking where they’re not supposed to, which creates the problem. He indicated
that people say that there is no parking downtown and that is because a lot of the parking is
dedicated to permit parking, the parking lots where there is available public parking do not have
clear directional signage so people do not know how to get there, and there are parking surfers
taking up all the on-street parking instead of parking in a parking lot.
Mr. Anderson stated that he was surprised that a parking app was not part of the recommendation.
He noted that it would give people a picture of where the parking is and could be developed later
on to include payments, and could even be connected to a calendar to show people upcoming events.
Responding, Mr. Finch advised that they had looked at that idea and he thought that it was definitely
something that the City and others could look at in the future. He stated that he thought that the cost
of apps was coming down, and they had seen other communities take them on as a solution or an
additional measure to enhance their parking situation. Mr. Finch advised that, right now, the clear
message that they want to pass on is that there is some obvious low-hanging fruit that needs to be
taken care of first. He explained that if a parking app were instituted now, it would not solve some
of the other issues, like the parking surfer problem.
Mr. Anderson noted that when Mr. Finch referred to short-term recommendations, it seemed obvious
that those are items that could be implemented right away. He asked what Mr. Finch’s definitions
are for medium- and long-term. In response, Mr. Finch indicated that Langan works with
communities all over the mid-Atlantic and they know that funding, resources, and capacity are
limited. He stated that their recommendation would be that short-term items are those that are really
critical and should be addressed within a year if possible, medium-term might be one (1) to three
(3) years, and long-term more than that. Mr. Finch advised that they realize that due to funding and
capacity needs there may not be capacity to implement all of them, and there might be other reasons
as well, for instance the community might have issues with one or another. He stated that they
would suggest that the City pick three (3) short-term, three (3) medium-term, and three (3)
long-term, maybe based on what the community and/or stakeholders want and try to focus on those.
Mr. Anderson noted that discussions regarding permit parking and moving people around had
always created a great deal of interest among stakeholders in the past. He indicated that some of the
parking spaces are contractual, like E-ZPass, and asked if they were part of the discussion and had
provided input. Responding, Mr. Finch stated that they definitely were, noting that they reached out
and talked to all of them. He advised that they know that no one wants to pay more and that is the
first gut reaction that most people have. Mr. Finch explained that if you go someplace and purchase
your seat in advance, you might pay $100 and the person whom you sit next to might have paid
$1,000, and you get the free benefits as a part of that. He stated that one (1) of the things that they
noticed during the outreach is that the public is willing to have that kind of graduated payment in
regard to different parking rates, and their short-term recommendation is to start looking at that from
the permit parking perspective.
Página 3
COUNCIL COMMITTEE OF THE WHOLE MEETING OF MARCH 27, 2018 PAGE 3
Mr. Finch advised that they know that this is a difficult issue and that there are some permits that
are locked into long-term lease agreements; however, he suggested that they could start talking to
E-ZPass and others who have lease agreements, and maybe they would be willing to shift some of
their needs to a farther lot. He stated that when they performed the traffic counts they noticed that
many of the permit parking lots sit vacant, explaining that although the permits are paid for, the lots
are not being used to full capacity. Mr. Finch indicated that if the City started adjusting the pricing
strategy, the lease holders would pay more for those who need to be there every day, and they may
not use as many spaces, which would release capacity for others. He stated that there is a price
distortion because everything is so cheap, explaining that it’s easier for somebody to just buy the
permit, even if they’re not using it, and it’s easier for a parking surfer to move their car around in
off-street parking every two (2) hours because it’s free. Mr. Finch noted, however, that it has
created a huge cost on the retailers on Loockerman Street because when people drive down
Loockerman Street and cannot find parking, they drive away and never come back. He stated that
these behaviors are creating a huge disadvantage for downtown Dover.
Mr. Neil stated that he believes in synergy. Referring to the gateways and signage, he indicated that
the City has an opportunity for synergy not only with the Downtown Dover Partnership (DDP),
which has control of certain parking lots, but also with Kent County Tourism, of which he is pleased
to sit on the board. Mr. Neil stated that these groups were looking at the same things and he thought
they need to be linked. He noted that Expedia, the travel website, had recommended Dover as a
weekend getaway because of the efforts of Kent County Tourism, and the signage that affects
parking affects the people coming from out of the state and the people who live here. Mr. Neil
stated that he thought that the report was terrific. He noted that there is a need to get all of the
players involved to make this work for Dover and continue to build the city.
Mr. Garfinkel stated that he thought it was an excellent report. He noted that it is not really a
predictive study; however, it mentions growth and, as he understood it, while there was not a current
need for a vertical parking garage yet, there may be in the future if the recommendations are
implemented. He asked if Mr. Finch was saying that if the City follows the recommendations, they
will draw more consumers to downtown, which would then draw more people who want to develop
downtown. Responding, Mr. Finch confirmed that this was one (1) of the messages from the report.
Mr. Slavin, referring to slide 5 depicting the available parking downtown, recalled that Mr. Finch
had apologized for the confusion on this slide. He thanked Mr. Finch for his work and stated that
he did not mean to demean it; however, this slide portrayed the exact problem, which is that it does
not make sense to anyone. Mr. Slavin advised that we can count spaces and do a tabletop exercise,
and move this checker here and that one there, but at the end of the day we end up with that. He
stated that, although it wasn’t within the purview of the study, he thought it was really critical that
some of the most valuable real estate from an economical development perspective is being
dedicated to surface parking, which is sometimes achieving 60% in capacity. Mr. Slavin stated that
if the City built a vertical parking garage as the solution, as he believes the City should, it could
open those properties for development and attract the new businesses that require new spaces. He
stated that the benefit would be more ratable property downtown, and the parking garage would pay
for itself in the long term probably two (2) times over on a payback period. Mr. Slavin noted that
members would continue to hear him ask for a parking garage downtown until one is built,
explaining that he thought it was an obligation of the city government to provide this for the
infrastructure downtown, just like building libraries and police stations.
Página 4
COUNCIL COMMITTEE OF THE WHOLE MEETING OF MARCH 27, 2018 PAGE 4
Mr. Sudler asked if the respondent pool of 20 or 40 people was strictly from the City of Dover, Kent
County, or outside of the City limits and whether they had live data to support it. Responding,
Mr. Finch advised that if members review the sign-in sheets, most of the individuals that responded
are either residents or work in downtown Dover. He stated that there were only one (1) or two (2)
people from outside the area that they noted at each of the three (3) public outreach meetings.
Mr. Sudler asked whether the majority worked or lived in Dover. In response, Mr. Finch stated that
he thought that there was a good mix. He advised that some public meetings had more people who
worked in Dover and some had more who resided in Dover.
Mr. Sudler asked what perplexities may arise in relation to the largest sized parking lot presented
in the study from the perspectives of the Delaware Department of Transportation (DelDOT), future
plans, or economic growth for the City of Dover. Responding, Mr. Finch stated that what they
looked at in each of the scenarios was really what would happen to traffic patterns downtown if you
located bigger public destination parking at different lots. He advised that they looked at opening
up some of the capacity to public parking on North and Loockerman Streets and expanding the
Bradford Street lot or building a parking garage there. Mr. Finch stated that if the development was
on Bradford Street or Governors Avenue, some of the traffic patterns would be simplified because
they are easier to reach from Loockerman Street and different directions. He noted that there are
larger capacity streets, this was only a schematic analysis, and they just looked at traffic patterns in
general and did not do specific counts.
In response to Mr. Sudler, Mr. Finch advised that they did not cross-reference with DelDOT when
they looked at the traffic patterns. He stated that this would be done if the decision was made to
further develop a parking lot or other facilities.
Mr. Sudler asked, in regard to the Langan psychological assessment, what the overall reasons were
that people feel uncomfortable about parking on New Street, and whether their concerns were related
to lighting, the element of people who live on that street, visible or alleged drug or criminal activity,
or the past reputation or stigma associated with that street. He asked if these concerns also applied
to connecting streets, such as Reed, Kirkwood, and Queen Streets. Responding, Mr. Finch advised
that they had heard all of these concerns from all stakeholders and the public. He noted that, while
doing a field review, they personally witnessed police activity on New Street, and there was constant
mention of issues with the liquor store when they were there. Mr. Finch stated that he thought that
a lot of concerns related to perception, noting that younger individuals may be more comfortable
walking to their cars even at night, while others who might need a little assistance, have a disability,
or may not be walking to their cars in a group, have issues with walking longer distances, especially
to the Governors Avenue lot.
Mayor Christiansen commended Mr. Finch on the work done and expressed appreciation. He
indicated that he shared the opinion expressed by Mr. Slavin that a parking garage was the ultimate
solution. Mayor Christiansen stated that he was not an expert but had memories that parking was
an issue in downtown Dover when he was five (5) years old and when he was first elected to Council
at the age of 32, and he noted that it is still an issue. He advised that he concurred that the City
would have to be unique and dynamic in its solution. Mayor Christiansen advised that Bayhealth
Medical Center had issues with parking and had grabbed the bull by the horns. He stated that
Bayhealth’s parking issues seemed to disappear and the garage was working out very well, although
Página 5
COUNCIL COMMITTEE OF THE WHOLE MEETING OF MARCH 27, 2018 PAGE 5
they still have quite a bit of surface parking. Mayor Christiansen indicated that he agreed that
signage could be better; however, he stated that, looking toward the future of downtown Dover and
the City of Dover, he would rather expend money for a parking garage and affordable parking than
signs.
Mr. Finch stated that he thought the City was looking at a chicken and egg problem regarding what
would come first to attract development downtown, noting that they would be glad to look at where
members feel the threshold is. He stated that, in the case of Bayhealth, they had a demand and it
made sense to build the garage. Mr. Finch advised that if the demand showed up, a garage was
definitely something that could be looked at. Mayor Christiansen stated that if we build it, they will
come.
Mr. Lewis commended Mr. Finch on the report. Responding to Mr. Lewis, Mr. Finch stated that
enforcement should also be looked at. He noted that if any of the rules for parking change, such as
wayfinding, rates, or better enforcement of current regulations, enforcement will be required to
change behavior. Mr. Finch stated that parking surfers are currently skirting the rules and are not
getting caught often enough. He stated that they had talked to the police and resources were
limited, noting that there were ways to use resources better. Mr. Finch suggested implementing
changes, educating, and then enforcing to make sure that the changes are sticking.
Mr. Neil noted that members would certainly have more to consider regarding the report and how
they will proceed; however, he recommended acceptance of the report.
Mr. Neil moved to recommend acceptance of the final report from the MPO, seconded by
Mr. Anderson and unanimously carried.
Briefing on Dover/Kent County Metropolitan Planning Organization (MPO) Projects
Mr. James Galvin, Principal Planner, Dover/Kent County Metropolitan Planning Organization
(MPO), introduced Mr. Reed Macmillan, Executive Director of the MPO. Mr. Macmillan stated that
this was his 150th day in his new capacity as Executive Director. He informed members that he had
worked from 1999-2002 for Kent County Levy Court in their Planning Services Department and
recently retired from New Castle County.
Mr. Galvin informed members that the MPO was currently preparing its Transportation
Improvement Program (TIP) for 2019-2022 and several projects located in Dover were included in
the State Capital Transportation Program (CTP), including a proposal to look at the intersection of
Forest Street (SR8) and Saulsbury Road (SR15). He expressed his belief that this project had been
contracted out, with funding for preliminary engineering and right-of-way for the coming fiscal year
and construction in 2021, and noted that there would be changes at that intersection fairly soon.
Mr. Galvin advised that they were studying the expansion of Saulsbury Road to two (2) lanes in each
direction from Forrest Avenue to College Road or beyond, depending on study results. He advised
that, although this project did not currently show up in the CTP, it may come up.
Mr. Galvin explained that the Loockerman Street/Forest Street Improvements project was in the
CTP and progressing, with preliminary engineering this year, right-of-way next year, and
construction in 2021. He stated that the Route 13 expansion to three (3) lanes in each direction from
Página 6
COUNCIL COMMITTEE OF THE WHOLE MEETING OF MARCH 27, 2018 PAGE 6
Puncheon Run to Lochmeath Way, just below the Lowe’s store, would go to construction in 2021
to 2022. Mr. Galvin noted that the other portion of this project, from Lochmeath to Woodside, is
a year or two (2) behind and, although that area is not in the City, it would be an important change.
Mr. Galvin stated that new projects that are important to the City had been put in the CTP this year.
He noted that there was a proposal to build a Dunkin Donuts and other office space on Forrest
Avenue across from the Modern Maturity Center. Mr. Galvin explained that the MPO’s Delaware
8 Concept Plan and Operations Study, which was released in 2008, included a proposal for a small
connector road, probably a local road, connecting Route 8 to Commerce Way at the Beiser
Boulevard warehouse buildings and to Food Lion at Gateway West. He stated that this project was
in the CTP for the out-years, with preliminary engineering in 2021 and 2022. Mr. Galvin explained
that because there would be construction at the Dunkin Donuts site, the State’s hand had been forced
and they would be looking at this project in the near future.
Mr. Galvin stated that Scarborough Road C-D Roads project would extend behind Dover Mall and
connect to Dover Downs, Leipsic Road, and the exit from Route 1. He explained that this would
be an alternative way to get from the Route 1 exit to Dover Mall and Dover Downs without having
to go on Route 13. Mr. Galvin indicated that the State would be looking at this project and doing
preliminary engineering in 2021 or 2022, with more intensive looks, right-of-way, and construction
occurring in the years beyond.
Mr. Galvin advised that College Road reconstruction was included in the CTP; however, there were
no items in the time period of the TIP. He explained that the MPO’s TIP goes out to 2022 and the
CTP goes out to 2024 and the CTP included funding in the out-years for College Road. Mr. Galvin
noted that the MPO had done a bike study, which was an important part of College Road. He
advised that College Road does not have any sidewalks on the portion from Kenton Road to
McKee Road and expressed his belief that this area will receive the same treatment that Walker
Road previously received.
Mr. Galvin stated that there was funding for the Crawford Carroll Road Extension behind Lowe’s,
noting that the road would extend to parking lots of the commercial enterprises along Route 13 but
not all the way to Delaware State University. He indicated that right-of-way acquisition was
planned for this year and next year, with construction in 2021 and 2022. Mr. Galvin stated that the
West Dover Connector was complete and the State was currently studying Kenton Road. He advised
that at the latest public workshop for Kenton Road, they were looking at a roundabout at the corner
of Chestnut Grove Road and Kenton Road instead of a stop sign, to avoid delays. Mr. Galvin
explained that a large amount of traffic comes from out of town on Kenton Road in the morning, and
a roundabout would be a way to keep traffic moving.
Mr. Galvin advised that the State was looking at West Street from New Burton Road to North Street,
explaining that there are no sidewalks on this stretch and there is a need for bike lanes. He noted
that there would be preliminary engineering for this project in 2021 and 2022, with right-of-way
acquisition in 2022.
Mr. Anderson noted that not having an interchange off Route 1 for the Garrison Oak Technology
Park had cost the City a fair number of jobs and asked if there were any thoughts on this. Mr.
Galvin stated that he had not seen anything to indicate that the Delaware Department of
Página 7
COUNCIL COMMITTEE OF THE WHOLE MEETING OF MARCH 27, 2018 PAGE 7
Transportation (DelDOT) was looking at this. He noted that there is currently a partial interchange
at Route 8, and DelDOT would be hard pressed to have another interchange essentially one (1)
major street north of that. Mr. Galvin stated that the MPO had looked at the possibility of running
some kind of road behind, from Leipsic down to White Oak. He stated his belief that there had
always been a proposal to run a connector road from Route 8 somewhere along the right-of-way of
Route 1 to get to White Oak Road, so that there would be a connection from the highway to the
industrial park. He indicated that he had not heard about this in quite a while and suggested making
sure that DelDOT knows that the City is interested in an interchange, if this is the case.
Update - Safety Issues at the Library
Mr. Lewis suggested deferring this matter since Mr. Lindell had requested it and was unfortunately
unable to attend the meeting.
Mr. Neil moved to defer consideration of this matter, seconded by Mr. Anderson.
Mr. Polce noted that library staff was present and suggested that they be allowed the opportunity to
provide an update.
Mr. Lewis asked the library staff if they could email members a written update regarding safety
issues at the library. As a point of order, Mr. Sudler suggested that the motion to defer be rescinded.
Mr. Neil agreed to rescind the motion; however, Mr. Anderson stated that he was not willing to
rescind.
The motion to defer consideration of this matter carried by a roll call vote of six (6) yes
(Anderson, Neil, Lewis, Slavin, Garfinkel, and Shelton), four (4) no (Sudler, Cole, Polce, and
Hare), and one (1) absent (Lindell).
Mr. Sudler moved for adjournment of the Safety Advisory and Transportation Committee
meeting, seconded by Mr. Neil and unanimously carried.
Meeting adjourned at 7:08 p.m.
UTILITY COMMITTEE
The Utility Committee met with Chairman Cole presiding.
AGENDA ADDITIONS/DELETIONS
Mr. Sudler moved for approval of the agenda, seconded by Mr. Lewis and unanimously
carried.
Presentation - Electric Rate Design and Cost of Services Study
Mrs. Donna Mitchell, City Manager, reminded members Burns & McDonnell did the City’s rate
design and cost of services study for years; however, this study was done by a new firm, NewGen
Strategies & Solutions, given the concerns of the City’s electric rates with some of the customers
for next fiscal year. She advised that this was a preliminary report which would be finalized and
Página 8
COUNCIL COMMITTEE OF THE WHOLE MEETING OF MARCH 27, 2018 PAGE 8
brought back with the rates at the budget hearings. Mrs. Mitchell noted that there would also be
discussions with the City’s customers regarding the study.
Mr. Joe Mancinelli, General Manager, Energy Practice, NewGen Strategies & Solutions, reviewed
a presentation entitled “City of Dover - Cost of Service and Rate Design Study”, dated March 27,
2018 (Attachment #2).
Mr. Slavin thanked Mr. Mancinelli for the presentation and cautioned members to heed
Mr. Mancinell’s words about the difference between using percentages and raw dollars at times.
Mr. Slavin explained that someone could walk away thinking that their electric bill is going up 5%
this year, when that person’s electric bill will go up $12 over the course of the year if they’re a low
user. He advised that members need to make sure their messaging is as synced up as the rest of this
study and that they know what their talking points are as they roll this out.
Responding to Mr. Anderson, Mr. Mancinelli confirmed that they are looking at averaging this over
a five-year time period.
Mr. Anderson asked what year the 2% change in residential rates would take effect. In response,
Mr. Mancinelli explained that the amounts listed under the proposed column on each slide depict
the rates that would become effective this year. He advised that the Power Cost Adjustment (PCA)
that is in there, the .0038 for the Purchase Power Agreement (PPA), is an average amount that the
City can afford to give back based on the forecast to the extent that it is different. Mr. Mancinelli
explained that the current PCA is much higher and, to the extent that it is different in July, members
would see a different effective increase. He stated that the Phase 2 and Phase 3 rates are not
included in the presentation. Mr. Mancinelli noted that he thought that the proposal would be to
eventually ask for approval of just Phase 1 and then see how the future plays out. He advised that
the cost of service is based on the cost of serving the customer class over the entire five (5) years
and is the same for every class.
Mr. Sudler asked, in regard to the residential class, if there were any concerns regarding the City’s
infrastructure impeding the positive outcome of the City’s profit rate that can be addressed in the
short term. Responding, Mr. Mancinelli stated that the design of the system does impact the cost;
however, they have not looked at the design to determine if it could be different or should be
different. He advised that it is serving its purpose now, and they only looked at the cost.
Rojan Meadows Sanitary Sewer Territory Transference
Members were advised that, in 2003, the Rojan Meadows subdivision was proposed within the City
of Dover. The development went through the City’s Development Advisory Committee (DAC) and
received initial approval from the Planning Commission. The original intent of this development
was to install gravity sanitary sewer mains and a pump station that would be dedicated to the City
of Dover. The project was tabled in 2010 and Rojan Meadows did not receive final approval from
the City of Dover. The developer has revived this project and is intent on obtaining final approval
for the Rojan Meadows development and one (1) aspect of the final approval is to provide sanitary
sewer service to all proposed lots. The proposal is to transfer the sanitary sewer territory of the
Rojan Meadows subdivision, and any adjacent lots to be served by this system, to Kent County for
Página 9
COUNCIL COMMITTEE OF THE WHOLE MEETING OF MARCH 27, 2018 PAGE 9
ownership and maintenance. Mrs. Sharon Duca, Public Works Director/City Engineer, reviewed
the background and analysis for this item.
Staff recommended granting conditional approval to transfer the Rojan Meadows sanitary sewer
territory to Kent County pending the developer’s ability to obtain all necessary approvals and
authorizations as required by the City.
Mr. Hare moved to recommend granting conditional approval to transfer the Rojan Meadows
sanitary sewer territory to Kent County pending the developer’s ability to obtain all necessary
approvals and authorizations as required by the City, as recommended by staff. The motion was
seconded by Mr. Lewis.
Mr. Anderson asked if the User Agreement modification should be based on Kent County standards
since the county has everything to do with this, including running and maintaining the pump station,
or if it has to be run on the standards for the City system. Responding, Mrs. Duca explained that the
changes that have to be made to the User Agreement specifically relate to how flow is determined
at the Dover East Pump Station since part of the City flow still goes into there. She stated that
currently there is only a deduction for the mobile homes that the County flows into the Dover East
Pump Station, and the agreement would have to allow for appropriate calculations for single-family
residences to go through, so that the City would be receiving the appropriate deduction from the
total flow from the station which determines what will be charged. Mr. Anderson asked if that
requirement would be based on the County or City requirements. In response, Mrs. Duca advised
that the County code specifically identifies what an equivalent dwelling unit (EDU) is for a mobile
home versus a single-family and the City only references the equivalent of a single-family; however,
they do coincide with each other.
In response to Mr. Neil, Mrs. Duca advised that if there are any costs related to the transference of
the Certificate of Public Convenience and Necessity (CPCN), they would have to be borne by the
developer.
The motion to recommend granting conditional approval to transfer the Rojan Meadows
sanitary sewer territory to Kent County pending the developer’s ability to obtain all necessary
approvals and authorizations as required by the City, as recommended by staff, was
unanimously carried.
Mr. Sudler moved for adjournment of the Utility Committee meeting. The motion was
seconded by Mr. Neil and unanimously carried.
Meeting adjourned at 7:59 p.m.
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
The Legislative, Finance, and Administration Committee met with Chairman Hare presiding.
AGENDA ADDITIONS/DELETIONS
Mr. Neil moved for approval of the agenda, seconded by Mr. Lewis and unanimously carried.
Página 10
COUNCIL COMMITTEE OF THE WHOLE MEETING OF MARCH 27, 2018 PAGE 10
Status of Other Post-Employment Benefits (OPEB) and Pension Funds
Due to time constraints, this item was deferred during the meeting of March 13, 2018.
Mrs. Donna Mitchell, City Manager, reviewed the General Pension, Other Post-Employment
Benefits (OPEB) - Retirement Health Insurance, and Police Pensions Post Retirement Benefit
Liabilities as of July 1, 2017 for the Plan Year June 30, 2019. She stated that the General Pension
unfunded liability total is down to $20M and is funded at 67.1% in total, noting that in FY 16 it was
funded at 60.7%, so it is up 7% in funding, which is very good.
Mrs. Mitchell advised that the report also included the percentages that have to be put into payroll
to put the actuarially determined contribution into the plans each year. Referring to the General
Fund, she advised that the normal cost is 4.21% in total, the amortization of the unfunded liability
and the interest cost is 44.05%, for a total of 48.26%, which she separated out so members could see
how much the unfunded liability is costing the City each year as a percentage of payroll. Mrs.
Mitchell noted that, in total, the percentage of payroll for the General Fund is 58% versus 29% for
the Electric Fund, explaining that the City is more fully funded with the Electric Fund than the
General Fund.
Mrs. Mitchell stated that the OPEB - Retirement Health Insurance is 41.9% funded in liability,
which has improved from FY 16 when it was funded at 33.7%. She advised that the City had a lot
of help in the last year with the market improving the investments. Mrs. Mitchell noted that the
actuarially determined contribution for OPEB is 13.7% for the General Fund, 2.20% for the
Water/Wastewater Fund, and 2.00% for the Electric Fund, for a total of 6.4%. She explained that
a lot of that percentage is driven by the police because they can retire earlier.
Mrs. Mitchell advised members that the City has to put a flat lump sum amount into the City of
Dover Police Pension Plan and the City is also part of the State of Delaware Police Pension Plan.
She noted that the City of Dover Police Pension Plan had improved 10% from last year, increasing
from 63% to 73% funded. Mrs. Mitchell advised that the Police Pension percentage of payroll is
16.68%.
Project Carry-Forward Budget Balances and Proposed Ordinance #2018-02 - FY 2017-2018
Budget Ordinances - First Amendment
Due to time constraints, this item was deferred during the meeting of March 13, 2018.
Mrs. Donna Mitchell, City Manager, reviewed the background and analysis for the project
carry-forward budget balances and Proposed Ordinance #2018-02 - FY 2017-2018 Budget
Ordinances - First Amendment. She explained that the proposed budget amendments bring forward
the carry-forward balances from last fiscal year as well as projects carried forward, and any other
adjustments that have been made during the year.
Staff recommended approval of the proposed budget amendments for Fiscal Year 2018 and adoption
of Ordinance #2018-02.
In response to Mr. Sudler, Mrs. Mitchell repeated that the transfer to the Parkland Reserve included
$2,809 from Mr. Sudler’s Parkland Revitalization fundraising.
Página 11
COUNCIL COMMITTEE OF THE WHOLE MEETING OF MARCH 27, 2018 PAGE 11
Mr. Neil, referring to Proposed Ordinance #2018-02 - FY 2017-2018 Budget Ordinances - First
Amendment, page 1, General Fund, Cash Receipt Summary for 2017-2018, asked for additional
details regarding how the $1.47M increase from the original budget to the revised budget happened.
Responding, Mrs. Mitchell explained that $214,000 was revenues that came in over budget, $1.1M
was the departmental expenses, more than $600,000 of which was from attrition for vacant positions,
wages and benefits, there were also materials and supplies, and all of the other expenses came in
under budget. She stated, for example, that the Customer Service Department was $204,000,
reminding members that Council approved additional staff; however, it took a while to get those
additional employees onboard. Mrs. Mitchell advised that some of the larger amounts included
Grounds Maintenance at $159,000 and Streets at $126,000, $80,000 of which she put back in next
year. She explained that it was pretty much the attrition and savings in the departments’ expenses.
Mr. Slavin stated that he did not believe that Mrs. Mitchell had answered Mr. Neil’s question,
indicating that the answer was because the City and members are good at what they do now,
Mrs. Mitchell is good at what she does, and the Finance Department is good at what they do. He
noted that they are also transparent and there is a higher degree of trust among all of them as
colleagues than there had been at any time that he had been on Council, so the numbers they were
hearing are true numbers that they can rely on.
Mr. Lewis moved to recommend approval of the proposed budget amendments for Fiscal
Year 2018 and adoption of Ordinance #2018-02, as recommended by staff. The motion was
seconded by Mr. Shevock and unanimously carried.
Grant Application Procedure Revisions
Ms. Lori Peddicord, Controller/Treasurer, advised members that during a recent US Department of
Justice (USDOJ) grant monitoring visit regarding Police Department grants, the City was requested
to revise City of Dover Grant Application Procedure No. 317 and the Police Department General
Order 17 Budget & Purchasing Procedures to add some additional controls and procedures to
monitor sub awards and subrecipient grant funding. Ms. Peddicord reviewed the proposed
procedure revisions (Attachment #3).
Staff recommended approval of the procedure revisions as requested.
Mr. Neil moved to recommend approval of staff’s recommendation, seconded by Mr.
Anderson and unanimously carried.
Diversity and Inclusion Study Request for Proposal (RFP)
Due to time constraints, this item was deferred during the meeting of March 13, 2018.
A Request for Proposal (RFP) for Diversity and Inclusion was issued on October 31, 2017 with a
bid opening on November 29, 2017. Five (5) submissions were received. After the closing, the
University of Delaware was contacted to determine their interest in the project. Following
discussions with the University, they submitted their response on February 8, 2018.
Mrs. Donna Mitchell, City Manager, advised members Mrs. Kim Hawkins, Human Resources
Director, had reviewed all of the proposals and all of them had come in over budget. Mrs. Mitchell
stated that she had moved money in Proposed Ordinance #2018-02 - FY 2017-2018 Budget
Ordinances - First Amendment to cover this expense if Council desires to move forward with the
Página 12
COUNCIL COMMITTEE OF THE WHOLE MEETING OF MARCH 27, 2018 PAGE 12
study. She stated that she felt that Kaleidoscope Group from Chicago was the best and most
qualified and their proposal, in the amount of $97,400, would cover the City’s needs.
Staff recommended authorizing funding up to $97,400 to support the full scope of the RFP.
Mr. Sudler moved to recommend approval of staff’s recommendation, seconded by Mr. Slavin
and unanimously carried.
Mr. Neil moved for adjournment of the Legislative, Finance, and Administration Committee
meeting. The motion was seconded by Mr. Shevock and unanimously carried.
Meeting adjourned at 8:14 p.m.
Mr. Anderson moved for adjournment of the Council Committee of the Whole meeting. The
motion was seconded by Mr. Sudler and unanimously carried.
Meeting adjourned at 8:14 p.m.
Timothy A. Slavin
Council President
TAS/TM/dd
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Minutes\2018\03-27-2018 CCW Minutes.wpd
Attachments
Attachment #1 - A presentation entitled “Downtown Dover Parking Study”, dated March 27, 2018, provided by
Mr. Spencer Finch, Project Manager and Sustainability Leader, Langan Engineering & Environmental
Services, Inc.
Attachment #2 - A presentation entitled “City of Dover - Cost of Service and Rate Design Study”, dated
March 27, 2018, provided by Mr. Joe Mancinelli, General Manager, Energy Practice, NewGen
Strategies & Solutions
Attachment #3 - Revised City of Dover Grant Application Procedure No. 317 and Police Department General Order
17 Budget & Purchasing Procedures
Página 13
ATTACHMENT #1
Downtown Dover
Council Committee of the Whole Meeting of 03/27/2018
Parking Study
Presented to the Dover City Council
March 27, 2018
Página 14
Downtown
WhatDover Parking Study
is the Project?
– “Too much?”
– “Too little?”
– “Too pricy?”
– “Too cheap?”
– “Easy to Understand?”
– “Convenient to where I want to go?”
Página 15
What is the Project?
= approximately 6.5 acres
Página 16
What is the Project?
Private Parking Lots Take
this much space
Public Parking Lots Take
this much space
Off-Street Parking Takes
this much space
= approximately 6.5 acres
Página 17
What is the Project?
Página 18
Parking Count Findings
• 1,762 total parking spaces
• On-Street Parking (607 spaces)
– Peak Hour – 12:30 to 1:30 pm
– Peak Occupancy Rate – 75%
– Peak Violation Rate – 16%
• Off-Street Public Parking (459 spaces)
– Peak Hour – 11 am – Noon
– Peak Occupancy Rate – 63%
Página 19
Peak Occupancy Per Lot
63% 62%
21%
83%
65%
84%
Página 20
ISSUES
What is the Project?
– Not easy to understand
– Cost of Parking
– Perception of Safety
– Sense of Place
Página 22
Cost of
DOVER
Parking:
Wilmington
(Per Hour /
On Street) Newark
Annapolis, MD
Media, PA
Página 23
Cost of
DOVER
Parking:
Wilmington
(Per Day / 12 x
Public Lots) Newark 8x
Annapolis, MD 13 x
Media, PA
Página 24
Current
DOVER
Cost of
Parking
DAILY: (Per Day / Public Lots)
(For 2 Hours / On-Street)
Página 25
Current
Newark
Cost of
Parking
DAILY: (Per Day / Public Lots)
(Per Hour / On-Street)
Página 26
PUBLIC
What isOUTREACH
the Project?
– 3 Public Meetings
– Newspaper Coverage
– Online Survey
Página 27
Questions from Public Outreach:
How Would You Spend Your ?
Quick Errand , but 20 mins only
to Downtown
Dover / hr, Off-Street
All day, Off-Street
Day-long Stay
All day, On-Street,
but moving car every 2 hours
All day, On-Street
Página 28
MORE FOR 2-hour PARKING
ON-STREET
ON-STREET
EVEN MORE THAN $4 FOR ON-STREET
Página 31
Potential Improvement Scenario 1
STRATEGY: Shift some permit parking to Bradford and Governor’s Avenue
Lots, Open Up Loockerman Way (or North Street) Lot to public parking
Página 32
Potential Improvement Scenario 2
STRATEGY: New State Street Alley Lot offers approximately 44 new
parking spaces.
Página 33
Potential Improvement Scenario 3
STRATEGY: Shift some permit parking to Bradford and Governor’s Avenue
Lots, Increase size of Bradford Street Lot,
Open Up Loockerman Way (or North Street) Lot to public parking
Página 34
Potential Improvement Scenario 4
STRATEGY: Shift some permit parking to Bradford and Governor’s Avenue
Lots, Open Up Loockerman Way (or North Street) Lot to public parking,
then build Bradford Street Garage for both Public and Permit Parking.
Página 35
How Would You Spend Your ?
Scenario 1 Less than $100k
Scenario 2 $1M to $2M
Scenarios 1 and 2 $1M to $2M
Scenario 3 $1M to $2M
Scenarios 2 and 3 $2M to $4M
Scenario 4 Over $10 M
Página 36
FUTURE DEVELOPMENT SCENARIOS
What is the Project?
Land Use Number of Parking Spots Required
Original Demand Scenario 1 – Scenario 2 – Scenario 3 –
Model Residential Residential Residential and
Growth, no new Growth, new Office Growth,
parking parking according new parking
to zoning according to
zoning
Commercial 414 414 414 414
Office/Industrial 823 823 823 1,107
Residential 260 688 688 688
TOTAL 1,498 1,925 1,925 2,209
Existing Supply 1,762 1,762 2,082 2,415
Calculated Raw Peak 85% 109% 92% 91%
Occupancy
Calculated Time of Day / 60% 79% 67% 58%
Parking Type Peak Occupancy
Página 37
CONCLUSIONS
What is the Project?
– Inefficient distribution of parking
capacity
• Some lots over 80% occupancy
• Some lots below 40%
– Confusing wayfinding
– Long-range planning
–BUT, very important: willingness of
public to try something NEW
Página 38
RECOMMENDATIONS
What is the Project?
– Short-Term
– Medium-Term
– Long-Term
Página 39
Short-Term Recommendations
What is the Project?
LOW-HANGING FRUIT
1. Wayfinding – Parking Lot
Directional Signage
2. Wayfinding – Private Parking
Lot Signage allowing evening
public parking
3. Pilot One-Year New Pricing
4. Reconfigure existing lots
(paint)
5. Shop owner / employee
program to discourage on-
street parking
6. Incentive campaign
Página 40
Medium-Term Recommendations
What is the Project?
1. Wayfinding – Downtown
Dover Destination and
WELCOME Signage
2. Metered Parking on
Loockerman Street
3. Pilot second phase of pricing
strategy
4. Streetscape and lighting
improvements
5. Promote Alternative
Transportation Options
6. Pay by cell phone
Página 41
Long-Term Recommendations
What is the Project?
1. NEW GATEWAY to
Downtown Dover
2. Long-Term Visitor
Promotion Program
3. New State Street Alley Lot
4. New Parking Garage once
development reaches
critical mass
Página 42
Wayfinding and Signage
Página 43
Wayfinding and Signage
Página 44
Potential On-Street Parking Zones
Página 45
Streetscape and Safety
Página 49
New Technologies
X
Online Payments
Smart
Meters
In-Car
Meters
Kiosk
Meters
Car Sharing Pay by Phone Solar PV
Bike Sharing
and more…
Página 51
Potential Cost Range of
Improvements
Short Term (Low-Hanging Fruit):
1. Wayfinding – Parking Lot Directional Signage – $42k
(Grant applciation submitted – DDP)
2. Wayfinding – Private Parking Lot Signage allowing evening
public parking – est. $2k - $5k (PPP)
3. Pilot One-Year New Pricing – No cost
4. Reconfigure existing lots (paint) – est. $2k - $15k (DDP)
5. Shop owner / employee program to discourage on-street
parking – No cost
6. Incentive campaign – None to $5k
Página 52
Potential Cost Range of
Improvements
Medium Term:
1. Wayfinding – Downtown Dover Destination and WELCOME
Signage – est. $50k (DelDOT?)
2. Metered Parking on Loockerman Street – est. $30k - $60k
3. Pilot second phase of pricing strategy – No cost
4. Streetscape and lighting improvements , including NEW
CONNECTOR ALLEY – cost not estimated, but probably in the
$100k - $400k range
5. Promote Alternative Transportation Options – est. $0 to $10k
6. Pay by cell phone – est. $50k + monthly fee to service provider
Página 53
Potential Cost Range of
Improvements
Long Range:
1. NEW GATEWAYS to Downtown Dover – cost not estimated,
but probably in the $100k - $400k range per gateway
created / enhanced
2. Long-Term Visitor Promotion Program – cost not estimated
3. New State Street Alley Lot – cost not estimated, but
probably in the $500k + range
4. New Parking Garage once development reaches critical
mass – cost not estimated, but likely more than $10 million
Página 54
VISION
Dover is on its way to becoming a vital destination, a
great place to be, work, live, and play.
Parking can be used more efficiently
Wayfinding will help parking – but also help Dover’s
sense of place and community
Streetscape, lighting, and Gateways will help build
on that
Pricing strategy can help parking work better
Communicate, communicate, communicate
Página 55
THANK YOU!
For more information, please contact:
Eddie Diaz, City of Dover
ediaz@dover.de.us
James Galvin, Dover/Kent County MPO
James.Galvin@doverkentmpo.org
Spencer Finch, Langan Engineering
sfinch@langan.com
Paul Vernon, KSK
pvernon@ksk1.com
Technical Excellence Practical Experience Client Responsiveness
Página 56
Technical Excellence Practical Experience Client Responsiveness
Página 57
ATTACHMENT #2
Council Committee of the Whole Meeting of 03/27/2018
March 27, 2018
City of Dover –
Cost of Service And Rate Design Study
1
Página 58
Agenda
• Cost of Service / Rate Design Overview
• Revenue Requirement
• Cost of Service
• Rate Design
– Rate Design Proposal
• Proposed Rates and Rate Impacts
• Discussion
NEWGEN STRATEGIES AND SOLUTIONS, LLC 2
Página 59
Cost of Service and Rate Design Overview
Página 60
Steps in the Analytical Ratemaking Process
Determine the revenue Revenue Requirement
STEP 1
requirements of the utility Determination
Unbundle costs by functions
STEP 2 and services (production,
transmission, distribution, etc.)
Classify costs (demand, energy,
STEP 3
customer costs, etc.)
Cost Allocation
Allocate cost among customer
STEP 4
classes
STEP 5 Design rates Rate Design
NEWGEN STRATEGIES AND SOLUTIONS, LLC 4
Página 61
Revenue Requirement
Página 62
Revenue Requirement
• Revenue Requirement based on five year
“Test Year” (FY 2019 – FY 2023)
– Rely on City’s financial forecast
• Start with FY 2017 expenses
• Cash basis
– Includes system investments for capital
– Recognizes existing reserve levels / policies
– Budget projections for operating expenses
• Includes TEA costs for future fuel / power
NEWGEN STRATEGIES AND SOLUTIONS, LLC 6
Página 63
Revenue Requirement ($000)
Item 2017 Cash Adjustments Test Year
Operation and Maintenance Expense
Dover Production $7,150 $165 $7,315
PJM Purchased Power $36,256 $4,683 $40,939
Transmission & Distribution $5,285 $690 $5,975
Metering / Customer $1,447 $216 $1,662
Admin & General $4,432 $842 $5,274
Subtotal O&M Expenses $54,569 $6,596 $61,165
Debt Service $1,611 ($2) $1,609
Transfer to General Fund $10,000 $0 $10,000
Appropriations to Reserve
Funds $11,402 ($5,050) $6,352
Subtotal Revenue
Requirement $77,582 $1,544 $79,126
Less Other Income ($922) $134 ($788)
Total Revenue Requirement $76,660 $1,678 $78,338
Revenue at Current Rates* $80,624 $2,112 $82,735
Over / (Under) $3,964 $4,397
Difference (%) 4.92% 5.31%
NEWGEN STRATEGIES AND SOLUTIONS, LLC 7
Página 64
Revenue Requirement
Test Year Revenue Requirement by Cost by Function (%) Street
Ligthing,
Function ($000) Customer, 3%
0.1%
Distribution,
13%
Production $60,789
Transmission ,
Transmission $4,778 6%
Distribution $9,802
Customer $2,943
Street Lighting $25
Total Cost of Service $78,338
Production , 77%
Production Transmission Distribution Customer Street Ligthing
NEWGEN STRATEGIES AND SOLUTIONS, LLC 8
Página 65
Revenue Requirement
Test Year Revenue Requirement by Cost Cost by Classification (%)
Classification ($000) Customer , 6%
Demand, 50%
Demand Related
Costs that vary with system capacity $39,092
Energy
Costs that vary with energy (kWh) sold $34,868
Customer
Costs that vary with number of customers $4,378
Total Cost of Service $78,338 Energy, 45%
Demand Energy Customer
NEWGEN STRATEGIES AND SOLUTIONS, LLC 9
Página 67
Cost of Service
Total System Load by Month
200,000
150,000
kW 100,000
50,000
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Month
System Peak Residential
• 2017 System Peak ~ 162.8 MW
• Peak in June, July, August, September
• 4 CP Cost Allocator
• Residential Class Peak ~ 66.6 MW
• Peak in June, July, August, September
• 4 NCP Cost Allocator
NEWGEN STRATEGIES AND SOLUTIONS, LLC 11
Página 68
Cost of Service – Test Year (Base Rates)
%
Cost of Current Proposed Change
Service Revenues Difference Revenues Difference (f)=
Class (a) (b) (c)=(b-a) (d) (e)=(c-a) (d/b)-1
Residential $28,937,503 $26,916,943 ($2,020,559) $27,468,331 ($1,469,171) 2%
Small Commercial $4,073,885 $3,002,651 ($1,071,233) $3,057,524 ($1,016,361) 2%
Medium
Commercial $4,923,543 $5,308,542 $384,998 $5,056,954 $133,411 -5%
Large Commercial $15,506,941 $18,197,969 $2,691,028 $16,944,837 $1,437,896 -7%
Primary $15,681,040 $18,344,980 $2,663,940 $17,097,531 $1,416,490 -7%
Transmission $8,220,137 $9,289,643 $1,069,506 $8,654,632 $434,495 -7%
Other Tran $191,020 $421,017 $229,996 $391,884 $200,863 -7%
Lighting $803,592 $1,208,940 $405,348 $1,208,940 $405,348 0%
Total $78,337,661 $82,690,685 $4,353,024 $79,880,632 $1,542,972 -3.4%
NEWGEN STRATEGIES AND SOLUTIONS, LLC 12
Página 69
Cost of Service
Average Cost of Service ($/kWh)
$0.0000 $0.0200 $0.0400 $0.0600 $0.0800 $0.1000 $0.1200 $0.1400 $0.1600
Small Commercial $0.1522
Residential Service $0.1394
Medium Commercial $0.1105
Lighting $0.0987
Large Commercial $0.0957
Primary Service $0.0830
Transmission $0.0734
Cost of Service ($/kwh)
Excludes PCA
NEWGEN STRATEGIES AND SOLUTIONS, LLC 13
Página 71
Rate Design Overview
COS and Rate Making
Cost of Service vs. Rate Making
Cost accounting, allocate utility Policy decisions, used to incentivize
costs with use, classification specific behavior, rates do not have
to precisely match cost of service
but should move towards COS
Utility Functions:
Power Supply Distribution Customer
(Demand and (Demand and (Customer
Energy Customer Components)
Components) Components)
NEWGEN STRATEGIES AND SOLUTIONS, LLC 15
Página 72
Rate Design Overview
Rate Making Best Practice
• Align a utility’s costs with appropriate
classifications (e.g. demand, energy,
customer)
– Costs categorized as fixed and variable
• Rates should fairly reflect the cost of service,
but policy should be considered
• Rates should incentivize customers to use
utility plant efficiently
NEWGEN STRATEGIES AND SOLUTIONS, LLC 16
Página 73
Rate Design Overview
Objectives
• Reduction in Revenue Requirement
– Reduction contribution to reserves
• Draw down Working Capital reserves through
Purchased Power Adjustment (PPA)
– Gradual decrease in PPA credit over 5 year period
• Adjust class revenues to better align with cost
causation
• Implement changes over 5 year period
– Rate changes for July 1 for FY19, FY21, FY23
– Rate change % are constant for each FY
NEWGEN STRATEGIES AND SOLUTIONS, LLC 17
Página 75
Rate Proposal – Residential Service
Class Characteristics
Residential Class Characteristics (Test Year)
Class Meters: 21,187
Class Annual Sales (kWh): 207,590,560
Average Monthly Sales per Customer (kWh): 732
Average Monthly Demand per Customer (kW): 4.65
Average Monthly Load Factor (%): 26%
NEWGEN STRATEGIES AND SOLUTIONS, LLC 19
Página 76
Rate Proposal – Residential Service
Phase I Rate Changes / Current Rates / COS Rates
Item/Rate - Residential Current Proposed (Phase 1) COS
Customer Charge ($/Month) $7.50 $8.46 $12.53
Energy Charge ($/kWh) $0.1203 $0.1206 $0.0466
Green Energy Charge - GEF
($/kWh) $0.00018 $0.00018 $0.00
PPA Charge ($/kWh) ($0.0086) ($0.0038) ($0.0038)
Demand Charge ($/kW)* $0.00 $0.00 $16.89
Average Monthly Bill** $98.89 $103.94
Average Rate ($/kWh) $0.1211 $0.1273 $0.1356
Difference (%) 5.11% 11.93%
* No Demand Charge for Residential Customers
**Excludes Public Utility Tax
Based on 2017 Billing Database Analysis
NEWGEN STRATEGIES AND SOLUTIONS, LLC 20
Página 77
Rate Proposal – Residential Service
Rate Curve Analysis
Accounts Current Proposed Cost of Service
$0.1900 6000
$0.1800
5000
$0.1700
4000
NO. ACCOUNTS
$0.1600
$/KWH
$0.1500 3000
$0.1400
2000
$0.1300
1000
$0.1200
$0.1100 0
200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000
KWH/MONTH
NEWGEN STRATEGIES AND SOLUTIONS, LLC 21
Página 78
Rate Proposal – Residential Service
Rate Impact Analysis - % Change (Phase I)
Average Monthly Increase (Decrease)
7000
6000
5000
Median: $4.27/Month
# Customers
4000
3000
2000
1000
0
$0.96 $2.22 $3.48 $4.75 $6.01 $7.27 $8.53 $9.79 $11.06 $12.32 $13.58 $14.84 $16.10 $17.36 $18.63 $19.89 $21.15 $22.41 $23.67 $24.94 $26.20 $27.46 $28.72 $29.98 $31.25
$/Month
NEWGEN STRATEGIES AND SOLUTIONS, LLC 22
Página 79
Rate Proposal – Residential Service
Rate Impact Analysis - % Change (Phase I)
Percentage Change in Annual Bills
12000
10000
Median: 5.2%
8000
# Customers
6000
4000
2000
0
4.57% 4.91% 5.25% 5.59% 5.94% 6.28% 6.62% 6.97% 7.31% 7.65% 7.99% 8.34% 8.68% 9.02% 9.37% 9.71% 10.05% 10.39% 10.74% 11.08% 11.42% 11.77% 12.11% 12.45% 12.80%
%/Year
NEWGEN STRATEGIES AND SOLUTIONS, LLC 23
Página 80
Rate Proposal – Small Commercial Service
Class Characteristics
Small Commercial Class Characteristics (Test Year)
Class Meters: 2,353
Class Annual Sales (kWh): 26,763,760
Average Monthly Sales per Customer (kWh): 854
Average Monthly Demand per Customer (kW): 4.60
Average Monthly Load Factor (%): 28%
NEWGEN STRATEGIES AND SOLUTIONS, LLC 24
Página 81
Rate Proposal – Small Commercial Service
Phase I Rate Changes / Current Rates / COS Rates
Item/Rate - Small Commercial Current Proposed (Phase 1) COS
Customer Charge ($/Month) - 1 Phase $7.50 $8.39 $27.58
Customer Charge ($/Month) - 3 Phase $22.50 $23.39
Energy Charge ($/kWh) $0.1004 $0.1006 $0.0466
Green Energy Charge - GEF ($/kWh) $0.00018 $0.00018 $0.00
PPA Charge ($/kWh) ($0.0086) ($0.0038) ($0.0038)
Demand Charge ($/kW)* $0.00 $0.00 $17.16
Average Monthly Bill** $98.23 $103.78
Average Rate ($/kWh) $0.1036 $0.1095 $0.1484
Difference (%) 5.65% 43.17%
* No Demand Charge for Small Commercial Customers
**Excludes Public Utility Tax
Based on 2017 Billing Database Analysis
NEWGEN STRATEGIES AND SOLUTIONS, LLC 25
Página 82
Rate Proposal – Small Commercial Service
Rate Curve Analysis
Accounts Current Proposed Cost of Service
$0.4300 450
$0.3800 400
350
$0.3300
300
NO. ACCOUNTS
$0.2800 250
$/KWH 200
$0.2300
150
$0.1800
100
$0.1300 50
$0.0800 0
100 200 300 400 500 600 700 800 900 1,000
KWH/MONTH
NEWGEN STRATEGIES AND SOLUTIONS, LLC 26
Página 83
Rate Proposal – Small Commercial Service
Rate Impact Analysis - % Change (Phase I)
Percentage Change in Annual Bills
500
450 Median: 6.0%
400
350
# Customers
300
250
200
150
100
50
0
5.34% 5.61% 5.88% 6.15% 6.42% 6.68% 6.95% 7.22% 7.49% 7.76% 8.03% 8.29% 8.56% 8.83% 9.10% 9.37% 9.64% 9.90% 10.17% 10.44% 10.71% 10.98% 11.25% 11.51% 11.78%
%/Year
NEWGEN STRATEGIES AND SOLUTIONS, LLC 27
Página 84
Rate Proposal – Medium Commercial Service
Class Characteristics
Medium Commercial Class Characteristics (Test Year)
Class Meters: 595
Class Annual Sales (kWh): 44,548,720
Average Monthly Sales per Customer (kWh): 6,176
Average Monthly Demand per Customer (kW): 22
Average Monthly Load Factor (%): 39%
NEWGEN STRATEGIES AND SOLUTIONS, LLC 28
Página 85
Rate Proposal – Medium Commercial Service
Phase I Rate Changes / Current Rates / COS Rates
Item/Rate – Medium Commercial Current Proposed (Phase 1) COS
Customer Charge ($/Month) - 1 Phase $7.50 $11.73 $28.77
Customer Charge ($/Month) - 3 Phase $22.50 $26.73
Energy Charge ($/kWh) $0.0677 $0.0658 $0.0487
Green Energy Charge - GEF ($/kWh) $0.00018 $0.00018 $0.00
PPA Charge ($/kWh) ($0.0086) ($0.0038) ($0.0038)
Demand Charge ($/kW) $13.95 $13.40 $16.41
Average Monthly Bill* $689.56 $699.39
Average Rate ($/kWh) $0.1106 $0.1122 $0.1067
Difference (%) 1.43% (3.55%)
*Excludes Public Utility Tax
Based on 2017 Billing Database Analysis
NEWGEN STRATEGIES AND SOLUTIONS, LLC 29
Página 86
Rate Proposal – Medium Commercial Service
Rate Curve Analysis
Accounts Current Proposed Cost of Service
$0.3400 180
160
$0.2900
140
$0.2400 120
NO. ACCOUNTS
100
$/KWH
$0.1900
80
$0.1400 60
40
$0.0900
20
$0.0400 0
10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
LOAD FACTOR
NEWGEN STRATEGIES AND SOLUTIONS, LLC 30
Página 87
Rate Proposal – Medium Commercial Service
Rate Impact Analysis - % Change (Phase I)
Percentage Change in Annual Bills
60
Median: 1.4%
50
40
# Customers
30
20
10
0
-2.73% -2.48% -2.24% -1.99% -1.75% -1.51% -1.26% -1.02% -0.77% -0.53% -0.29% -0.04% 0.20% 0.45% 0.69% 0.93% 1.18% 1.42% 1.67% 1.91% 2.15% 2.40% 2.64% 2.89% 3.13%
%/Year
NEWGEN STRATEGIES AND SOLUTIONS, LLC 31
Página 88
Rate Proposal – Large Commercial Service
Class Characteristics
Large Commercial Class Characteristics (Test Year)
Class Meters: 448
Class Annual Sales (kWh): 162,084,240
Average Monthly Sales per Customer (kWh): 28,435
Average Monthly Demand per Customer (kW): 85
Average Monthly Load Factor (%): 46%
NEWGEN STRATEGIES AND SOLUTIONS, LLC 32
Página 89
Rate Proposal – Large Commercial Service
Phase I Rate Changes / Current Rates / COS Rates
Item/Rate - Large
Commercial Current Proposed (Phase 1) COS
Customer Charge ($/Month) $22.50 $30.11 $34.43
Energy Charge ($/kWh) $0.0677 $0.0647 $0.0466
Green Energy Charge - GEF
($/kWh) $0.00018 $0.00018 $0.00
PPA Charge ($/kWh) ($0.0086) ($0.0038) ($0.0038)
Demand Charge ($/kW) $13.90 $13.38 $16.50
Average Monthly Bill* $3,130 $3,142
Average Rate ($/kWh) $0.1037 $0.1041 $0.0918
Difference (%) 0.40% (11.46%)
*Excludes Public Utility Tax
Based on 2017 Billing Database Analysis
NEWGEN STRATEGIES AND SOLUTIONS, LLC 33
Página 90
Rate Proposal – Large Commercial Service
Rate Curve Analysis
Accounts Current Proposed Cost of Service
$0.2900 100
90
$0.2400 80
70
NO. ACCOUNTS
$0.1900 60
$/KWH
50
$0.1400 40
30
$0.0900 20
10
$0.0400 0
10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
LOAD FACTOR
NEWGEN STRATEGIES AND SOLUTIONS, LLC 34
Página 91
Rate Proposal – Large Commercial Service
Rate Impact Analysis - % Change (Phase I)
Percentage Change in Annual Bills
200
180
Median: 0.6%
160
140
# Customers
120
100
80
60
40
20
0
-3.21% -2.26% -1.32% -0.37% 0.57% 1.52% 2.46% 3.41% 4.35% 5.30% 6.24% 7.19% 8.14% 9.08% 10.03% 10.97% 11.92% 12.86% 13.81% 14.75% 15.70% 16.64% 17.59% 18.53% 19.48%
%/Year
NEWGEN STRATEGIES AND SOLUTIONS, LLC 35
Página 92
Rate Proposal – Primary Commercial Service
Class Characteristics
Primary Commercial Class Characteristics (Test Year)
Class Meters: 43
Class Annual Sales (kWh): 188,909,620
Average Monthly Sales per Customer (kWh): 385,950
Average Monthly Demand per Customer (kW): 957
Average Monthly Load Factor (%): 56%
NEWGEN STRATEGIES AND SOLUTIONS, LLC 36
Página 93
Rate Proposal – Primary Commercial Service
Phase I Rate Changes / Current Rates / COS Rates
Item/Rate - Primary Current Proposed (Phase 1) COS
Customer Charge ($/Month) $15.00 $19.66 $37.71
Energy Charge ($/kWh) $0.0676 $0.0654 $0.0456
Green Energy Charge - GEF
($/kWh) $0.00018 $0.00018 $0.00
PPA Charge ($/kWh) ($0.0086) ($0.0038) ($0.0038)
Demand Charge ($/kW) $11.25 $10.67 $15.68
Average Monthly Bill* $32,448 $32,831
Average Rate ($/kWh) $0.0886 $0.0896 $0.0792
Difference (%) 1.18% (10.60%)
*Excludes Public Utility Tax
Based on 2017 Billing Database Analysis
NEWGEN STRATEGIES AND SOLUTIONS, LLC 37
Página 94
Rate Proposal – Primary Commercial Service
Rate Curve Analysis
Accounts Current Proposed Cost of Service
$0.2900 8
7
$0.2400
6
NO. ACCOUNTS
$0.1900 5
$/KWH
4
$0.1400 3
2
$0.0900
1
$0.0400 0
10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
LOAD FACTOR
NEWGEN STRATEGIES AND SOLUTIONS, LLC 38
Página 95
Rate Proposal – Primary Commercial Service
Rate Impact Analysis - % Change (Phase I)
Percentage Change in Annual Bills
7
6
Median: 0.9%
5
# Customers
4
3
2
1
0
-5.00% -4.71% -4.41% -4.12% -3.82% -3.53% -3.24% -2.94% -2.65% -2.36% -2.06% -1.77% -1.47% -1.18% -0.89% -0.59% -0.30% 0.00% 0.29% 0.58% 0.88% 1.17% 1.47% 1.76% 2.05%
%/Year
NEWGEN STRATEGIES AND SOLUTIONS, LLC 39
Página 96
Rate Proposal – Transmission Service
Class Characteristics
Transmission Class Characteristics (Test Year)
Class Meters: 4
Class Annual Sales (kWh): 112,077,720
Average Monthly Sales per Customer (kWh): 2,385,305
Average Monthly Demand per Customer (kW): 4,413
Average Monthly Load Factor (%): 32%
Transmission Class: DAFB, Kraft, P&G and White Oak Solar
NEWGEN STRATEGIES AND SOLUTIONS, LLC 40
Página 97
Rate Proposal – Transmission Commercial Service
Phase I Rate Changes / Current Rates / COS Rates
Item/Rate - Transmission Current Proposed (Phase 1) COS
Customer Charge
($/Month) $0.00 $0.00 $46.76
Energy Charge ($/kWh) $0.06370 $0.06180 $0.0450
Green Energy Charge -
GEF ($/kWh) $0.00018 $0.00018 $0.00
PPA Charge ($/kWh) ($0.0086) ($0.0038) ($0.0038)
Demand Charge ($/kW) $10.50 $9.80 $14.21
Average Monthly Bill* $173,709 $177,369
Average Rate ($/kWh) $0.0743 $0.0759 $0.0695
Difference (%) 2.11% (6.50%)
*Excludes Public Utility Tax
Based on 2017 Billing Database Analysis
NEWGEN STRATEGIES AND SOLUTIONS, LLC 41
Página 98
Rate Proposal – Transmission Service
(Supplemental)
• Transmission – Federal
– Maintain discount on energy ($0.002/kWh)
• 69 kV Transmission for NRG 88 MW EWG
System Peak:
May: 4:00 PM
June: 3:00 PM
July: 4:00 PM
Aug: 4:00 PM
Sept: 5:00 PM
Oct: 4:00 PM
NEWGEN STRATEGIES AND SOLUTIONS, LLC 42
Página 99
Rate Proposal – Transmission Service
(Supplemental)
• 69 kV Transmission for NRG 88 MW EWG
– Currently on Transmission Rate
• $10.50 / kW
• $0.06370 / kWh
– Proposed Rate
• $7.96 / kW
• $0.0618 / kWh
– Implement annual on-peak penalty
NEWGEN STRATEGIES AND SOLUTIONS, LLC 43
Página 100
Other Rates
• Business Retention Rate
– Maintain discount
• Private Outdoor Lighting
– No change to lighting rates
– New LED lights at equivalent lumen rate
NEWGEN STRATEGIES AND SOLUTIONS, LLC 44
Página 102
ATTACHMENT #3
Council Committee of the Whole Meeting of 03/27/2018
PROPOSED CHANGES TO:
CITY OF DOVER
DEPARTMENT OF FINANCE
PROCEDURE MANUAL
TITLE: Grant Application Procedures PROCEDURE # 317
DATE: November 2, 2007
REVISED: November 7, 2014
Introduction
This procedure is intended to establish clear directions for accounting for and administering the funds
and resources received by the City through Federal, State, and other Grants.
It is the City’s policy to strictly prohibit any political activities related to Federal, State and other political
subdivision assisted programs. The City’s employees will not engage in such activities nor spend City
funds or grant funds in such activities.
Definitions
“Closeout”: The process of finalizing a grant project, including completion of the final financial reports,
determination of cash balances, accomplishment of necessary accounting entries and placing all project
files in a manageable holding system.
“Department”: Departments are the major organizational sub-divisions. They have a broad overall
purpose. The City of Dover is organized into departments as follow: Customer Services, Parks &
Recreation, Library, Public Works, Police, Public Utilities, Mayor, Economic Development, Procurement &
Inventory, City Clerk, City Manager, Information Technology, Finance, Human Resources, and Tax
Assessor.
“Grants”: Funds and resources procured by the City which are restricted as to usage by the government
or institution providing the funds. Usually, there is an application process whereby the City provides
evidence of its need for the funds, its ability to use the funds in a manner approved by the grantor, and
detailing the expenditures expected to be incurred. The primary grant providers to the City are the
Federal and State governments.
“In Kind Match”: A grant where the required match is not a cash contribution, but is existing personnel
time, equipment or material made available for the purpose of the grant.
“Matching Funds”: Dollars that must be available in order to qualify for a grant. Often grantors will not
support the entire cost of a project and require that the applicant provides a certain share of the project
cost from other sources.
“NOFA”: Notice of funding availability. Grant-making agencies issue a NOFA to solicit applications.
FI 105
1
Página 103
“OMB Circular A-87”: Establishes principles and standards for determining costs for Federal awards
carried out through grants, cost reimbursement contracts, and other agreements with State and local
governments.
“Pass-Through Entity”: a non-Federal entity that provides a subaward to a subrecipient to carry out
part of a Federal program.
“Subaward”: an award of financial assistance in the form of money, or property in lieu of money, made
under an award by a recipient to an eligible subrecipient or by a subrecipient to a lower tier
subrecipient. The term includes financial assistance when provided by any legal agreement, even if
the agreement is called a contract.
“Subrecipient”: a legal entity to which a subaward is made and which is accountable to the recipient
for the use of the funds provided.
Departmental Grant Application Decision Making Process
1. The Departments are responsible for seeking out new grant resources. The Department shall analyze
the need and future costs of a grant before applying for a grant. A number of questions shall
be considered by the department before determining whether a grant application is appropriate.
A Department Grant Application Analysis Form to be completed by each department can be
found in Appendix A.
2. A copy of the Department Grant Application Analysis Form should be maintained in the grant
folders at the department level and copies distributed to the City Manager and Finance Director for
budgeting and auditing purposes.
3. If the annual project/program cost in excess of the grant award exceeds $25,000 Council approval is
required. A copy of the Department Grant Application Analysis Form should accompany the
appropriate approval forms.
Grant Application Process
1. The Application process is the most critical step. The requesting department prepares the grant
application package and submits the approved, completed grant packages to the proper grantor
institution. The reviewing body will make their decision solely upon the evidence of need as
shown in the application. Therefore, a well-documented proposal is imperative. Departments
should review the requirements of the application closely.
2. City Council must approve the application of all grants which require a ‘monetary’ match in funds
of $25,000 or more from the City of Dover or if the grant requires City Council approval. Grants
requiring ‘in-kind’ matches do not need Council approval. The Department shall be responsible
for acquiring City Council approval before applying for grants with these requirements. Please
note if the grant and match have been fully identified in the approved budget, Council approval
shall be met. This procedure does not negate any requirements of the City Purchasing Policy.
3. The application cannot be submitted to a grantor for consideration without the written approval
of the Department Head regardless of the amount. A copy of the application with the Department
Head’s signature should be kept on file within the submitting department.
FI 105
2
Página 104
4. The requesting department will be responsible for ensuring that all approved applications are
signed by the Mayor or appropriate official prior to submission.
Grant Award/Post Award Process
1. The requesting department receives the grant award letter. Federal award notification is received
by email. If the City is awarded the grant, a Committee Action Form (CAF) is to be prepared for the
Legislative, Finance & Administrative Committee to approve the grant award. The CAF shall include
any non-grant funded expenses listed in the ‘Department Grant Application Analysis Form’
for the current and future fiscal years. The application must include the CFDA# for federal
programs and follow the most recently published Office of Justice Financial Guide.
Several types of state funded grants are awarded to local law enforcement agencies state- wide
based on annual allocations of funds approved by the State Legislature and quarterly
applications for funds resulting from property and drug seizures. The Police Department must
conform to the grantor requirements for spending these funds, as well as any procedures for
pass through Federal Grants as provided above. The Police Chief approves the application for
and disbursing of these particular funds.
2. A grant records file shall be maintained and updated by the requesting department for each
application throughout the grant process, including the final accounting and closeout. The file
shall consist of, at a minimum, the application, acceptance letter and a spreadsheet detailing
cash receipts and disbursements. The Department must maintain records of expenditures
including any appropriate supporting documentation in accordance with the Federal/State grant
guidelines and City’s retention policy. The expenditures must be reviewed to determine if they
are an eligible expense under the grant agreement.
3. Confidential records supporting expenditures for informant funds etc, used by the Police
Department will be maintained in accordance with current policies and procedures for the
department. Procedural notice 42 Criminal Investigations, section VII outlines those procedures
to be followed by the Police Department.
4. The Department Head, or his/her designee, shall monitor the status of the grant application and
the subsequent award.
5. The original signed grant contract shall be added to the appropriate grant file and identified with
a contract number and the performance period.
6. Copies of all documents are to be provided to the Finance Department to monitor complianc e
and completion of the annual audit.
7. Where applicable, Public Hearings and Advisory Board Meetings must be held in accordance
with the grantor requirements throughout the term of the grant.
FI 105
3
Página 105
Subawards and Monitoring Procedures
1. The requesting department receiving the grant award is the award recipient. If the department is
approved or required to make subawards for a Federal grant received, the department is also
considered a pass-through entity. For these types of grants, the department must ensure the
identifying Federal award information and applicable compliance requirements, including applicable
special conditions, are clearly designated in the subrecipient award agreement. The subaward or
agreement must, at a minimum, include the following information:
A. Catalog of Federal Domestic Assistance (CFDA) title and number
B. Award name and number
C. Name of the Federal awarding agency
D. Activities to be performed
E. Period of performance
F. Project policies
G. Original award flow-through requirements that are applicable to the subrecipient
H. Instructions and procedures for subaward monitoring compliance
I. Other policies and procedures that may apply and need to be followed
J. Dollar limitation of the agreement
K. Cost principles to be used in determining allowable costs
2. In addition, the department must complete the actions required during the grant program to monitor
the subrecipient’s use of Federal funds. The methods of monitoring may vary. Following are some
of the factors that may be considered in determining the nature, timing, and extent of monitoring:
A. Programs with complex compliance requirements that may have a higher risk of non-
compliance.
B. The larger the percentage of program awards passed through, the greater the need for
subrecipient monitoring.
C. Larger dollar awards are of greater risk.
D. Subrecipients may be evaluated as higher risk or lower risk to determine the need for closer
monitoring. Generally, new subrecipients may require closer monitoring. For existing
subrecipients, based on results of during-the-award monitoring and subrecipient audits, a
subrecipient may warrant closer monitoring (e.g., the subrecipient has a history of non-
compliance as either a recipient or subrecipient, new personnel, or new or substantially changed
systems).
3. Some of the mechanisms that may be used to monitor subrecipient activities throughout the year
include:
A. Review monthly financial and performance reports submitted by the subrecipient.
B. Perform subrecipient site visits to examine financial and programmatic records and observe
operations.
C. Review detailed financial and program data and information submitted by the subrecipient when
no site visit is conducted. Documents to review might include timesheets, invoices, contracts,
and ledgers that tie back to financial reports.
D. Regular communication with subrecipients and appropriate inquiries concerning program
activities.
FI 105
4
Página 106
4. The purpose of all monitoring activities is to provide reasonable assurance that the subrecipient has
administered the pass-through funding in compliance with the laws, regulations, and the provisions
of the award and that the required performance goals are being achieved.
Accounting Procedures
1. The Department Head shall request account numbers for grant revenues and expected
expenditures from the City Finance office. Where applicable a project number will be assigned
to each grant to track receipts and expenses.
2. The Finance Department and Department Head are responsible for maintaining separate records
for each grant project to avoid commingling of grant funds.
3. The Department Head is responsible for assuring all grant project funds are expended according
to the terms of the grant. All grant project funds must be obligated by the termination date(s)
specified in the grant. Any matching funds must be expended and reported timely.
4. The Department Head is responsible for submitting any required reimbursement requests to the
grantor as authorized expenditures are incurred. At the end of each fiscal year, the Department
Head shall submit to the Finance Department a list of all outstanding reimbursement requests and
qualified expenditures incurred, but not submitted to the grantor for reimbursement. Accordingly, the
Finance Department shall create a grant receivable entry, reconciling this to the grant activity recorded
during the period.
5. Purchase, Invoice and Payment processing shall be in accordance with the City of Dover
Purchasing Policy, incorporated into this procedure by this reference. Payroll processing shall
be in accordance with City payroll procedures.
6. Retention of records shall be in accordance with the State of Delaware’s Local Government
General Records Retention Schedule for Grants, which specifies grant financial files are to be
retained for five three years after submission of the grant closeout letter and successful audit.
7. Requests for drawdown of funds must be in accordance with award requirements specified by
the grantor.
8. Receipts are received and entered into the General Ledger by the Finance Department.
9. The Department Head is responsible for maintaining records of all inventory purchased and are
to provide an updated copy to the Finance Department June 30 each year for audit purposes.
All records for equipment, non-expendable personal property and real property shall be retained
for a period of at least three years from the date of the disposition, replacement, or transfer.
10. Records must be maintained for each non-expendable item that costs $5,000 or more and has
a useful life of one year or more. The Department Head shall send the invoices and appropriate
backup data to the Finance Department for recording in the Capital Asset System.
11. The Department Head is responsible for timely submission of reports to the grantor as required
under the terms of the grant.
FI 105
5
Página 107
12. The Department Head is responsible for submitting quarterly and final Financial Status Reports
(FSR’s) for grants if required under the terms of the grant. A copy of any FSR must be submitted
to the Finance Department before being sent to the grantor. Finance shall reconcile amounts
reported on the FSR with the amounts recorded in the City's accounting system. Any discrepancy
shall be resolved by the Department Head and communicated to the Finance Department.
13. The Department Head is responsible for performing and monitoring closeout activities.
14. Any unexpended funds shall be returned to the grantor and any interest earned on cash balances
shall be disbursed in accordance with the grant requirements.
15. The Finance Department is responsible for preparing Form SF-SAC, “Data Collection Form for
Reporting on Audits of States, Local Governments, and Non-Profit Organizations,” in accordance
with Federal OMB Circular A-133.
16. A quarterly report will be presented to City Council by the Finance Department for all grants.
Control of Grant Funds
1. Interest earned and expended is promptly recorded in the accounting records and reported on
the FSR’s. FSR’s are due 45 days after the end of the calendar quarter.
2. Grant funds and interest earned is expended by the end of the allowable period.
3. Matching funds are expended and reported timely.
4. Final FSR’s are submitted timely.
5. The Department Head will ensure grant requirements are met and if necessary will request
changes from the grantor 60 days before the end of the award period.
6. Draw down of Federal funds will be initiated after the Department submits the quarterly FSR’s.
This ensures that the department has already paid for the cost of goods or services incurred on
behalf of Federal grants. Any funds received in advance will be placed in an interest earning
account.
7. Department Heads ensure matching funds are spent and that related expenditures are tracked
for reporting purposes.
8. Department Heads will obtain permission from federal grantees to spend the interest earned a s
part of the grant proceeds. They will request a Budget Adjustment Request to augment grant
budgets with interest earned revenues that they have received.
DISTRIBUTION
Mayor CDBG Director Police Department
City Manager Department Heads
FI 105
6
Página 108
Dover Police Department
General Order 17
BUDGET AND PURCHASING PROCEDURES
I. PURPOSE
The purpose of this order is to outline the responsibilities associated with budgeting and
purchasing, and the procedures to be followed in carrying out those responsibilities
II. POLICY
The Dover Police Department will manage all budget, grant and purchasing procedures in
accordance with the procedures established by the City of Dover. If a conflict between the city
procedures and established grant guidelines occurs, the grant guidelines will be followed.
III. BUDGET PROCESS
The Police Resources Manager is responsible for all actions associated with budget preparation
and management. These duties include the following:
A. Request inputs for the annual budget from the Chief of Police, Deputy Chief and Division/Unit
Commanders for use in budget planning and preparation.
B. Prepare a draft budget and follow-up documents using procedures established by the City of
Dover.
C. Review all expenditures throughout the fiscal year and make recommendations to the Chief
of Police for any required budget revisions.
IV. GRANT PROCESS
The Police Resources Manager is also responsible for all actions associated with the preparation
of grant applications, management, and reporting to include the following duties:
A. Request inputs for grant applications from the staff for use in their preparation.
B. Perform all grant management and oversee all purchasing actions.
C. Prepare financial grant status reports as required. For granting agencies that require the
submission of both financial and program status reports, the Police Resources Manager will
be responsible for the financial reports and the Administrative Division Commander will
complete the program reports. The separation of these duties is mandated by Federal grant
guidelines for internal control purposes.
D. Perform subgrant monitoring as required. There are police grants that may be awarded on
a joint basis due to a disparate funding situation identified by the granting agency. The prime
example of this includes recurring law enforcement grants the police department receives
from the Federal Department of Justice. For these grants, the Dover Police Department
shares its award with other agencies as identified in the grant funding authorization document
which is published on the USDOJ website at the time of the grant solicitation. Since the
Dover Police Department usually is awarded the larger share of funds on these grants, it
MAR 2018 GO 17 - 1
Página 109
Dover Police Department
becomes the pass-through entity and makes subawards to the other agencies on the joint
awarded grant. The following procedures will apply:
1. Grant subawards will be issued and contain any applicable information as identified in
the City’s Grant Application Procedures (Procedure 317). However, all grant purchases
will be made and paid for directly through the City of Dover’s financial systems, so the
Dover Police Department will ensure all grant purchases comply with the City of Dover
Purchasing Policy.
2. Subrecipient monitoring: the grants received in the past were awarded jointly to the
Dover Police Department, Smyrna Police Department and Kent County for purchases of
law enforcement equipment and/or training. The funding for the subrecipient shares did
not exceed $25,000, so there is less risk involved with completing these types of
purchases. As a result, monitoring procedures will include: the review of the program
and financial documentation submitted for the grant purchases to ensure they comply
with the City of Dover Purchasing Policy and verification that the purchases were made
and the required equipment lists are provided to close the grant.
3. The monitoring instructions above will be outlined in the Memorandum of Understanding
that is required to be submitted as part of the grant application and in the grant subaward
document.
V. PURCHASING PROCEDURES
The Central Services Coordinator is primarily responsible for all department purchases.
Additional personnel may be authorized to make purchases by the Chief of Police. The following
procedures will be followed:
A. All purchases will comply with the City of Dover Purchasing Policy.
B. Commanding officers will be held accountable for those portions of the agency’s budget that
relate to their functions. Requests for purchases will be based on the approved budget and
made through the chain of command to the Police Resources Manager and Central Services
Coordinator:
1. Daily Operating Supplies include office, computer and custodial supplies, uniform items,
and other similar items that do not require any special bid actions.
a. Ordering - Requests for these items will be provided to the Central Services
Coordinator via personal memorandum from the staff or using the Dover Police
Department Requisition form. Verbal or voicemail requests will not be honored
because there is no audit trail
1) A copy of the form is included in Attachment A and is maintained in the forms
directory on the I drive on the department server.
2) This form was created using a workflow application which will automatically route
the form electronically through the chain of command via email for the appropriate
approvals. As a result, please do not photocopy the form and fill it out manually.
a. Pick-up - Once the items have been received, the Central Services Coordinator will
notify the individual that the item is in and will coordinate a time for pick-up.
MAR 2018 GO 17 - 2
Página 110
Dover Police Department
b. Occasionally, the requestor may need to pick-up ordered items directly from the local
vendor. To maintain accountability of the items, approval must be obtained from the
Central Services Coordinator prior to pick-up. In addition, the person making the
pickup will ensure the receipt for the items is provided to the Central Services
Coordinator as a written receipt/verification for all items is required by Finance to
make the payment.
2. Special order items include non-stocked items such as specialized equipment; grant
funded equipment, etc.
a. Ordering – Requests for these items will be provided to the Central Services
Coordinator via personal memorandum for items costing $5,000 and less or Dover
PD Bid Summary form for items valued over $5,000.
b. Bid Information and process – Requestors must perform research to provide bidding
information. The minimum information needed to process the request includes: item
description, quantity and recommended sources. Three sources are needed and
identify vendor names and phone numbers. The Central Services Coordinator will
contact the vendors to obtain their particular item specifications. Once the
information is received, the Central Services Coordinator will coordinate with the
City’s Purchasing Agent for formal bids, when required to order the item.
c. Pick-up - Once the order is filled and items have been received, the Central Services
Coordinator will notify the individual that the item is in and will coordinate a time for
pickup.
3. Exceptions – the only exceptions recognized to the above guidelines apply to the ordering
of computer equipment, computer software, building maintenance supplies, weapons
and ammunition. The Department LAN Technician, Special Operations Response Team
(SORT) Commander, and Building Craftsperson in coordination with the Central Services
Coordinator or Police Resources Manager will order these types of items respectively,
and in accordance with the City of Dover purchasing policy.
C. All invoices and receipts for items received will be reviewed by the Central Services
Coordinator and forwarded to the Police Resources Manager for further processing.
D. The Police Resources Manager will prepare the necessary documentation required for
payment through the City of Dover financial systems. Approval of purchases will be
accomplished by the Police Resources Manager or other designee as authorized by the
Chief of Police.
VI. ACCOUNTING PROCEDURES
A. The Police Resources Manager will maintain records of all invoices and payments throughout
each fiscal year. A record of all transactions will be maintained for each line item account,
including all grant accounts with the exception of salary and fringe benefit accounts.
B. Accounts established for Petty Cash transactions will be managed in accordance with the
City of Dover’s Petty Cash Procedures.
C. All Funds and accounts are subject to the independent audit conducted annually as
contracted by the City of Dover.
MAR 2018 GO 17 - 3
Página 111
Dover Police Department
D. Accounting of all agency-owned property shall be the responsibility of the Central Services
Coordinator in accordance with procedures under separate cover. The Central Services
Coordinator shall also be responsible for the maintenance and operational readiness of all
stored property.
VII. DEFINITIONS
“Pass-Through Entity”: a non-Federal entity that provides a subaward to a subrecipient to
carry out part of a Federal program.
“Subaward”: an award of financial assistance in the form of money, or property in lieu of
money, made under an award by a recipient to an eligible subrecipient or by a subrecipient to
a lower tier subrecipient. The term includes financial assistance when provided by any legal
agreement, even if the agreement is called a contract.
“Subrecipient”: a legal entity to which a subaward is made and which is accountable to the
recipient for the use of the funds provided.
VIII. SUPERSEDES
This Procedural Notice supersedes all previous procedures and directives issued orally or in
writing that are not in total conformity herewith.
IX. EFFECTIVE DATE
This Procedural Notice shall become effective upon execution and issuance
ORDER EFFECTIVE AND ISSUED THIS ___ day of Mar 2018
Marvin C. Mailey
Chief of Police
MAR 2018 GO 17 - 4
Página 112
Dover Police Department
NOTE: The Requisition Form below is maintained on the I drive forms directory. Please fill
out the form from there as it was created using an application that automatically routes the
user’s request electronically for approvals via email.
BID SUMMARY FORM
-- SAMPLE –
Police Resources Manager Approval Date
Central Services Coordinator Approval Date
PFC Smith 4/5/16
Requester Date
Item Description:
Undercover Joey Wire (4 each)
Funding Source: Accounting Classification:
EIDE Grant 710-1700-545.20-26
Method of Purchase (Circle One):
Sole Continuity of Declared Other – Explain
Bid Vendor Service Emergency ___________________
COMPARISON OF BIDS
Vendor Contact Person Phone # Pricing Info
Vendor A Jim Rogers 555-1234 $7500 /set plus shipping
Vendor B Herman Mueller 555-2225 Does not carry model requested
Vendor C Heidi Lewis 555-8908 $5500/set plus shipping
Recommended Vendor: Vendor A
Reason for Award: Lowest Bid
MAY 2017 17 – Attachment B