Página 1
COUNCIL COMMITTEE OF THE WHOLE AGENDA
AUGUST 13, 2019 - 6:00 P.M.
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA, DOVER, DELAWARE
PUBLIC COMMENTS ARE WELCOMED ON ANY ITEM AND WILL BE PERMITTED AT APPROPRIATE
TIMES. WHEN POSSIBLE, PLEASE NOTIFY THE CITY CLERK (736-7008 OR E-MAIL AT
CITYCLERK@DOVER.DE.US) SHOULD YOU WISH TO BE RECOGNIZED.
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE
ADOPTION OF AGENDA
1. REVIEW OF ACTIVE RECREATION AREA PLAN (AND REQUEST FOR PARTIAL CASH-IN-LIEU) FOR
WHITE OAK PROPERTY: APARTMENTS AND TOWNHOUSES (PLANNING REFERENCE: S-19-15)
(STAFF RECOMMENDATION: APPROVAL OF THE ACTIVE RECREATION AREA PLAN WITH THE
COMMENTS AND CONDITIONS PROVIDED)
(STAFF RECOMMENDATION: ACCEPTANCE OF THE $3,490.87 CASH-IN-LIEU OF RECREATION AREA
CONSTRUCTION DONATION, AS THE AMOUNT COMPLIES WITH THE REQUIREMENTS OF THE ZONING
ORDINANCE)
2. COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM SEMI-ANNUAL UPDATE
(MARCH 2019 - AUGUST 2019)
(COMMITTEE ACTION NOT REQUIRED)
3. DOVER PARK MASTER PLAN
(STAFF RECOMMENDATION: THAT THE CITY PROCEED WITH THE "FINAL CONCEPT" WITH A SPLASH
PAD AND SMALL BUILDING AND, IF FUNDS AND SPACE CAN BE FOUND, A CAN-DO PLAYGROUND)
4. PRESENTATION - SKATE PARK ADVOCATES (DEFERRED FROM JULY 9, 2019)
5. ADJOURNMENT OF PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE MEETING
UTILITY COMMITTEE
ADOPTION OF AGENDA
1. ANNUAL REVIEW AND APPROVAL OF GOVERNING POLICY FOR ENERGY COMMODITY RISK
MANAGEMENT
(STAFF RECOMMENDATION: APPROVAL OF THE PROPOSED AMENDMENTS)
2. ADJOURNMENT OF UTILITY COMMITTEE MEETING
ADJOURNMENT OF THE COUNCIL COMMITTEE OF THE WHOLE MEETING
/TM S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\COMMITTEE-AGENDAS\2019\08-13-2019 CCW AGENDA-NEW.WPD
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(E )(2), THIS
AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE
SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING.
Página 2
City of Dover
•
DATA SHEET FOR RECREATION PLAN REVIEW
Review of Active Recreation Area Plan and
Consideration of Cash-in-Lieu Donation
PARKS, RECREATION AND COMMUNITY ENHANCEMENT COMMITTEE
MEETING OF August 13, 2019
PLANNING COMMISSION MEETING of August 19, 2019
Plan Title: White Oak Property: Apartments and Townhouses on 3 parcels of
land on White Oak Road, S-19-15
Plan Type: Active Recreation Area and Consideration of Cash-in-lieu
Donation
(Cash-in-lieu of Recreation Area Construction)
Associated with Site Plan S-19-15
Location: North side of White Oak Road, west of State Route 1
Addresses: 1317 White Oak Road and other not yet addressed properties on
White Oak Road
Tax Parcels: ED-05-068.11-01-05.00-000
ED-05-068.11-01-03.00-000
ED-05-068.11-01-01.00-000
Owner/Applicant: Harman Brothers, LLC
Site Area: 11.17 acres (three parcels)
Zoning: C-2A (Limited Central Commercial Zone)
Present Use: vacant, wooded areas
Proposed Use: Apartment Building of 24 units and Eight (8) Townhouse Units
Dwelling Units: 32 units
Recreation Area: Required – 21,780 SF
Provided – 6,450 SF (Deficient 15,330 SF)
Proposed Cash-in-lieu Donation: $3,490.87
I. PROJECT SUMMARY:
The project proposes a new residential development consisting of an apartment building of
twenty-four (24) units and a townhouse series of eight (8) units, along with associated site
improvements including parking and landscaping. There is a single entrance point to White Oak
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Página 3
S-19-15: White Oak Property: Apartments and Townhouses Active Recreation Area – Approval of Cash Donation
Report to Parks, Recreation & Community Enhancement Committee – August 13, 2019
Page 2 of 7
Road. To the west, the apartment building is encircled by parking and a drive-aisle for
circulation. The townhouse units on the east are accessed from a drive-aisle connection which
ends in a cul-de-sac turnaround.
The three (3) project parcels currently consist of wooded areas with some open areas adjacent to
White Oak Road. The project requires some clearing of the existing woodland for the
development activities. The largest of the three parcels is impacted by the 100-year floodplain
and wetland areas. With the project, the three (3) parcels will be consolidated into one parcel of
land with all units on the one parcel.
II. SPECIAL FLOOD HAZARD AREAS AND WETLANDS
Portions of the subject site are within the City’s Flood Hazard Area (100-year flood plain). These
properties are found on the FEMA FIRM Panel of Kent County Delaware Map Number
10001C0167H, dated May 5, 2003. Letter of Map Revision LOMR #18-03-1850P effective
January 29, 2019 revised FIRM Map #1001C0167H and shows the site areas within the 100-year
floodplain. (It supersedes LOMR #17-03-0901P effective June 4, 2018 that also revised FIRM
Map #10001C0167H.) It is also noted that data collection continues in this area which may result
in future submissions to FEMA for a Letter of Map Revision that may impact the floodplain on
these properties. The Zoning Ordinance, Article 5 §11.21 requires that flood hazard areas (100-
year floodplain) remain as open natural areas with no impervious surfaces.
The subject site also includes areas of wetlands. The Zoning Ordinance, Article 5 §11.22
prescribes provisions related to wetland areas. There are setback requirements from wetland
areas that are over 0.25 acres in size where development activities are limited, and where no
buildings or impervious areas can be located.
III. ACTIVE RECREATION AREA PLAN SUMMARY:
As part of the Plan review process for this project, the applicant prepared a Conceptual
Recreation Plan which illustrates how the White Oak Road Property: Apartments and
Townhouses development will provide recreation amenities in accordance with the design
specifications described in Article 5, Section 10 Open space, recreation, and other public
facilities of the Zoning Ordinance. Due to the property size and unit density, this project does
not qualify for any of the Active Recreation Area exemptions for small developments under
Zoning Ordinance, Article 5 §10.5.
The Active Recreation Area is required at a rate of 275 SF per unit or a half acre (21,780 SF),
whichever is greater. With this project of thirty-two (32) units, the Active Recreation Area
requirement calculates to 8,800 SF; however, the half-acre (21,780 SF) is required.
The Active Recreation Area proposal for the White Oak Road Property project is depicted in the
plan submission of Site Plan Sheet REC – Recreational Plan and in a Letter of Request. The
proposal to is provide an open field/lawn area in the eastern portion of the site. It is 6,450 SF in
size and is dimensioned at 68 feet in width and varies 57 feet to 103 feet in depth. The following
table provides information from the submitted Plan (dated June 2019) for the Active Recreation
Area as proposed:
Página 4
S-19-15: White Oak Property: Apartments and Townhouses Active Recreation Area – Approval of Cash Donation
Report to Parks, Recreation & Community Enhancement Committee – August 13, 2019
Page 3 of 7
Required Provided on Plan
Active Recreation Area 275 S.F. per dwelling unit or ½ Open Lawn/Field area as
(Article 5 §10.514) acre (21,780 SF) whichever is Recreational area = 6,450 SF
greater to be provided on site. Width: 68 feet
Depth: 57 feet to 103 feet
32 DU = 8,800 SF
Required = 21,780 SF
Provided: 6,450 SF
Deficient: 15,330 SF (0.35 ac)
Active Recreation Accessible Located at the east end of the
Amenities development and accessible via
(Article 5 §10.15) proposed sidewalk system.
Active Recreation Age Oriented to development Open Lawn/Field area allows
Amenities variety of multi-purpose
(Article 5 §10.15) activities (i.e. “pick-up” games)
and would serve all ages.
Parking This type of recreation area does
not have associated parking
needs. There are on-site parking
areas for the apartment complex
and the townhouse units.
Setbacks: 30 feet from residential There no specific equipment
lots and 25 feet from right-of-way amenities or designated game
for street court surfaces that must meet this
requirement.
Landscaping The project shows existing
woodland area around the open
field. There are proposed tree
plantings around the overall
development site including along
the sidewalk leading to the open
field area.
IV. CONSIDERATION OF CASH-IN-LIEU
The applicant has made a request for consideration of Cash-in-lieu of Recreation Area
Construction. Their request seeks to pay cash-in-lieu of construction the remaining recreation
area of 15,330 SF (21,780 SF – 6,4500 SF). If the Planning Commission determines that the
construction of some or all of the required active recreation area is not practical or desirable, then
they shall require a full or partial cash in lieu donation for the portion of the active recreation
area determined as not practical or desirable. The applicant would be required to make a cash
donation to the City’s Parkland Reserve Fund in lieu of the required recreation area.
Article 5 §10 of the Zoning Ordinance addresses Open Space, Recreation and Other Public
Facilities outlines the calculation of the amount for cash-in-lieu of recreation area construction.
Página 5
S-19-15: White Oak Property: Apartments and Townhouses Active Recreation Area – Approval of Cash Donation
Report to Parks, Recreation & Community Enhancement Committee – August 13, 2019
Page 4 of 7
For the calculation of the amount of the cash donation, the Zoning Ordinance specifies that the
“cash donation shall be equivalent to the appraised value of land required…” and that land area
value shall be “based on the appraisal prepared for the developer to secure construction
financing.”
An appraisal performed by Dover Consulting Services, Inc., Report dated March 21, 2017, was
submitted to the Planning Office (as page excerpts from appraisal of multiple properties). (The
appraisal document is on file in the Planning Office.) This appraisal identifies a market value
(land value) of the properties which was utilized to generate a land value per acre. Based on the
value of the 15,330 SF of land required to satisfy the Active Recreation Area requirement, the
cash-in-lieu amount was determined. See calculation below:
2017 Appraisal of Land Value: $130,000
White Oak Road properties consists of 13.034 acres of land1
Land Value per acre = $9,973.91 per acre
Active Recreation Area Deficiency = 15,330 SF = 0.35 acre
Cash-in-Lieu Amount = $9,973.91 per acre value x 0.35 acre = $3,490.87
V. REVIEW PROCESS
The Planning Office has prepared this Active Recreation Area Report outlining the Recreation
Area proposal and outlining the amount of the Cash-in-lieu donation. The Parks, Recreation and
Community Enhancement Committee will need to consider the proposed Active Recreation Area
and the proposed Cash-in-lieu of Recreation Area payment request and make a recommendation.
The Planning Commission must act to accept the Recreation Area Plan and the Cash-in-lieu
donation as part its review of the Site Development Plan.
The Parks, Recreation and Community Enhancement Committee will review the Recreation Area
Plan and the Consider the Cash-in-lieu Donation amount for the White Oak Road Property:
Apartments and Townhouses at their meeting on August 13, 2019. The Planning Commission
Public Hearing and Review of the Site Plan S-19-15 and the Recreation Area Plan/Consideration
of Cash-in-lieu Donation is scheduled for August 19, 2019.
VI. CODE CITATIONS:
Dover Code of Ordinances, Appendix B – Zoning, Article 5 – Supplementary Regulations,
Section 10 – Open Space, Recreation and Other Public Facilities (select excerpts).
Article 5 Section 10
Section 10. - Open space, recreation and other public facilities.
The City of Dover shall require the reservation of open space, recreation and other public facilities in
accordance with the provisions of this section as a condition of approval for all one-family dwelling, two-
1 The appraisal was completed on four (4) properties held by Harman Brothers, LLC located on White
Oak Road. Only three of the four properties (parcels) are involved in this Site Development Plan. The
four properties consist of a total of 13.034 acres and the three properties of the project consist of a total of
11.17 acres.
Página 6
S-19-15: White Oak Property: Apartments and Townhouses Active Recreation Area – Approval of Cash Donation
Report to Parks, Recreation & Community Enhancement Committee – August 13, 2019
Page 5 of 7
family dwelling and multiple-family dwelling residential developments requiring conditional use approval,
site development plan approval, or land subdivision approval by the City of Dover Planning Commission.
10.1 Recreation areas.
10.11 Purpose. The purpose of this section is to ensure that active recreation areas are
provided as an integral design element within residential developments and that such facilities are
of an adequate scale in relation to the size of the residential development and which provide
residents with a variety of active recreational pursuits.
10.12 Dedication required. The commission shall require the dedication or reservation of
recreation areas, and the subsequent construction of recreation facilities of a character, extent
and location suitable to the needs created by a development for recreation facilities as defined
and in accordance with the design guidelines set forth.
10.13 Definition. The following are illustrative of the types of recreation areas and subsequent
facilities that shall be deemed to serve active recreational needs and therefore to count toward
satisfaction of the recreation area requirements of this section: tennis courts, handball courts,
racquetball courts, swimming pools, saunas and exercise rooms, meeting or activity rooms within
clubhouses, baseball and soccer fields, basketball courts, volleyball courts, swings, slides and
play apparatus, and developed walking, jogging or biking trails.
10.14 Recreation area review….
10.15 Design guidelines…
10.16 Area required…
10.17 Cash in lieu of recreation area construction.
10.171 Determination of suitability for cash donation. If the commission determines that
the construction of recreation is not practical due to close proximity to existing available
recreation facilities or infeasible due to natural characteristics of the land or will not
benefit the residents of the development, the commission shall require a full or partial
cash in lieu of areas of donation to be made by the developer in lieu of a full or partial
dedication of land.
10.172 Separate recreation account. The cash donation shall be deposited in a
separate account to be used for parks, playgrounds or recreational purposes.
10.173 Amount of cash donation. The cash donation shall be equivalent to the
appraised value of land area required in section 10.16. The land area value shall be
based on the appraisal prepared for the developer to secure construction financing. This
submitted appraisal shall be a copy of the original supplied to the lending institution, with
that institution identified, and shall conform in all ways to the Uniform Standards of
Professional Appraisal practice and be performed by an appropriately qualified certified
appraiser. If an appraisal prepared for construction financing is not available, then the
developer shall have an appraisal done in accordance with the procedures set forth in
[sub]section 10.174.
10.174 Appeal of appraised value. If the city does not accept the land value established
by the appraisal detailed in [sub]section 10.173, the city may, at the developer's expense,
require another appraisal be performed. This appraisal will be let on a bid basis between
at least three appropriately qualified, certified appraisers selected by the city. The
appraiser(s) who prepared the original appraisal in [sub]section 10.173 cannot be a party
to this appeal appraisal.
10.175 Payment of cash donation. One hundred percent cash donation provided under
this section shall be collected prior to issuing the first building permit for the development.
Página 7
S-19-15: White Oak Property: Apartments and Townhouses Active Recreation Area – Approval of Cash Donation
Report to Parks, Recreation & Community Enhancement Committee – August 13, 2019
Page 6 of 7
10.7 Council approval. Prior to acceptance by the planning commission, all areas planned for public
dedication, or cash donations provided under this section must be submitted to, and approved by the
parks, recreation, and community enhancement committee of the City of Dover, and shall be subject to
final review and approval by [the] city council.
VII. STAFF RECOMMENDATIONS
The following are comments and recommendations from Staff of the Planning Office following
review of the Active Recreation Area Plan and Request for Consideration of Cash-in-lieu.
1) Active Recreation Area: As a residential development there is a requirement for Active
Recreation area. The project proposes an Open Field/Lawn area with no specific amenity
improvements. Staff recommends approval of this Open Field/Lawn concept for its
opportunities for multi-purposes. As it does not include development of a specific game court
surface, a variety of “pick-up” games like football, soccer, throw & catch activities, etc. are
possible. The impacts of the 100-year floodplain and wetland areas limit the development of
the properties involved. Staff also notes that this property is within proximity to the existing
City park known as Dover Park that has a variety of amenities (playground, game
courts/fields, trails, etc.).
2) Staff Recommends the following regarding this Recreation Area:
a. The grass lawn area must be prepared and appropriately maintained to allow for such
use of the field as a play surface.
b. Consideration of placement of a bench.
c. Posting of rules for use of the Open Field Recreation area.
3) Given the proximity of this development to the existing Dover Park facility, Staff
recommends the applicant explore options to create a clear pedestrian and/or biking route to
that Park for use by its residents. This may involve construction of additional sidewalks
(missing segments) along White Oak Road heading west from the property location to the
Park and a pedestrian crossing.
4) The proposed plan presents an area designated for Active Recreation Area for this project.
However, the plan is required to provide 21,780 SF of Active Recreation Area and it is
currently shown as proposing 6,450 SF of Active Recreation Area. The project is deficit
15,330 S.F. of Active Recreation Area.
a. The deficiency of Active Recreation Area must be satisfied. There are multiple
options to achieve this including, but not limited to, a reduction in the project unit
count and/or size of the proposed buildings to increase outdoor open space
availability, the addition of interior recreation space, or a cash-in-lieu donation for the
recreation area. The applicant has made a request for Cash-in-lieu of Recreation Area
Construction.
5) Consideration of Cash-in-lieu of Recreation Area Construction: The Commission should
determine how the proposal should best address the requirement for an Active Recreation
Area, which must be at least one-half acre (21,780 SF) as required by the Zoning Ordinance.
The applicant is seeking to instead pay a cash-in-lieu for a portion of the required area not
provided. Staff recommends acceptance of the $3,490.87 Cash-in-lieu of Recreation Area
Página 8
S-19-15: White Oak Property: Apartments and Townhouses Active Recreation Area – Approval of Cash Donation
Report to Parks, Recreation & Community Enhancement Committee – August 13, 2019
Page 7 of 7
Construction donation, as the amount complies with the requirements of the Zoning
Ordinance.
VIII. ADVISORY COMMENTS
1) The Site Development Plan set including any plan sheets depicting the Recreational Area are
to include appropriate improvements, plans, and details of the Recreation Area as approved.
2) The applicant is reminded of the requirements for construction phasing of the recreation area
as associated with the development of the residential units.
Article 5 §10.6 Construction Phasing. The recreation and open space areas shall be
completed in a proportion equal to or greater than the proportion of residential dwelling
units completed, except that one hundred (100) percent of the recreation and open space
areas shall be completed prior to issuing building permits for the final twenty (20) percent
of the dwelling units proposed. Building permits shall not be issued for dwelling units
unless the requirements of this section are met.
3) There shall be provisions which ensure that the common open space land (including the
active recreation areas) shall continue as such and be properly managed and maintained. The
developer shall either retain ownership and responsibility for maintenance of such open land
or provide for and establish one (1) or more organizations for the ownership and maintenance
of all common open space i.e. a Homeowners Association. The organization shall be
responsible for maintenance, insurance and taxes on the common open space.
4) In the event, that major changes and revisions to the Site Plan occur in the finalization of the
Plan contact the Planning Office. Examples include reorientation of buildings, relocation of
site components, changes in floor area or unit count, or design revisions impacting Active
Recreation Areas. These changes may require resubmission for review by the Development
Advisory Committee, Planning Commission, or other agencies and commissions making
recommendations in regard to the plan.
5) The Parks, Recreation, and Community Enhancement Committee shall submit to the
Planning Commission a report detailing the recommendations as to the Recreation Area Plan
and Request for Consideration of Cash-in-Lieu Donation.
Attachments:
• Site Plan S-19-15 Active Recreation Plan as Sheet REC – Recreational Plan dated June
2019
• Letter regarding Recreational Areas and Request for Consideration of Cash-in-lieu
Donation dated 7/24/2019
Página 9
DAVIS
• l~
•
• BOWEN &
FRIEDEL, INC. ARCHITECTS ENGINEERS SURVEYORS
ivlic/1oel R. Wigley. AJA. LEED AP
W. Zachary Crouch. P.E.
ivllchoel E. Wheeclleton. A/A
Jason P. Loar. P.E.
Ring W. Lardner. P.E.
July 24, 2019 Jamie L. Sechler P.E.
City of Dover
Planning Department
P.O. Box 475
Dover, DE 19903-0475
Attn: Dawn Melson-Williams, AICP
RE: White Oak Road Property
Preliminary Site Plan - Active Open Space Waiver
Tax Map No.: ED-05-068.11-01-01.00, 03.00 and 05.00
DBF #: 1649A002
Dear Mrs. Melson-Williams:
On behalf of our client, Harman Brothers, LLC, we are respectfully requesting a waiver
from Appendix B, Article 5, Section 10.16 regarding recreational areas. The project as designed
would require one-half acre ofland (21,780 SF). This project is unique given the environmental
resources and protection where the developable area is approximately 3 .17 acres of land or 28%
of the total acreage. We have included a recreational area that is 6,450 square feet and will
consist of an open field that can be used for multi-purposes (i.e. soccer, wiffle ball, flag football,
playing catch, etc.).
Attached to this letter is a plan showing the recreational area and most recent appraisal of the
property. The appraised value is $130,000.00 for 13.034 acres of land or $9973.91 per acre. We
are requesting to pay a cash in lieu of for the difference between the code required area and
provided area and calculate the fee to be:
Required Area: 21 ,780 SF
Provided Area: 6,450 SF
Shortfall Amount: 15,330 SF (0.35 AC)
0.35 AC * $9,973.91 per AC = $3,490.87
:::J 601 E MAll•I STREET SUITE 100. SALISBURY MD 21804-5021 • 410.543 9(WI
0 I PARK AVENUE, M ILFORD, DE 19963 • 302.424. 144 1
_J 1,)6 ~IOl?TH WASHl~IGTO~I ST SUITE 103. EASTO~l /'vlD ~1601 • 4'0.770.47.J-l
www.dbfinc.com
Página 10
Mrs. Dawn Melson-Williams
July 24, 2019
Page 2 of2
If you have any questions or require additional infonnation, please do not hesitate to contact me
at (302) 424-1441 or via email at rwl@dbfinc.com.
Respectfully Submitted,
Davis, Bowen & Friedel, Inc.
Ring W. Lardner, P.E.
Principal
P:\Harman\While Oak Proper1y\Doc11men/s\2019-07-24 Aclive Open Space Waiver\Cover Lei/er.doc
Página 11
u
. 1/) -"' .,_.,_
"' -
a::
-z
0
0
.,_ .,_
I I
~ "' .,_N
_j ~
0
w ::, "'
~~
Cl:'. 0 N
l'.l 0 1/)
- 0
w w ,Id ~~
a::
~
0
LL 1/)
z w
en a:: '.'i Cl'.
>-
~
w w
"
(XJ' (XJ Cl:'.
,Id w "'
<
(XJ
<( z ::,
w
00
>
J< z c.,
z :,: 0
<(
z l'.l ::i
w
w w "':::, ciCl'.
z 3:
0
0 "'::J __,
if) 0
m ~
LL
< ::,
. <::
if)
Vl J:
O' u
~
50' 100' 150'
a::
<(
0
z
:s
D..
...I
c.. -
c(
z
0
•
- ~
-- a:
0
w
a:
N/F
WANDA L POWELL
T_M_ 2-D5-D6810-04-0500
D/647/034
ZONED: RM2
\
..
•,___ _
''
l
I
I
I >-
I-
a:
--1 -
' \
w
a..
\
0
a:
--- . ,
100 YEAR FLOOD PLAIN a..
C
<C w
a:
0
_/ a: a: ~
--- - •---, L __,/
~ w Qw
:s
L
>
<C 0
•-·
0 C z~
Cl
, ZONED: RM2 ,
J.M. 2-o~osailof!N, 1s, 42 & 43 w 0LL 0::::,
-
BAY TREE TOIIN~OOSES
' y
I- 0
> I-z
:I: I-
~ 0- ~
,,
n
w
[
c,
u
Revisions:
C
u
Q_
,'
C
0
C
f-
1'
Q_
. ,'
-
/\
C
V•
m Date: JUNE 2019
0"'
/ Scale:
l 1•=50'
"'
Q_
Dwn.By:
p RJL
Q_
Proj.No.:
1649A002
,,"' Dwg.No.:
[
I
C
0
n
REC
'' THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED, REUSED, REDISTRIBUTED, OR DISPLAYED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2019
Página 12
CDBG Semi-Annual Report
March 2019 – August 2019
CDBG Semi-Annual Review
- The City was awarded $282,307 in program funds for fiscal year 2019.
- The 2019 Annual Action Plan was submitted in May 2019 and has been approved by HUD.
- The City is in compliance with policies and procedures for Davis Bacon Labor Standards with a
satisfactory rating and no findings by HUD from its review in June.
The following projects are scheduled to be underway in late August.
CDBG FY19 Projects
Homeownership Assistance Program
CDBG funds will be used to provide settlement assistance up $20,000 to first-time homebuyers
who purchase affordable housing in the City.
Dover Interfaith Mission for Housing (DIMH)
CDBG funds will be used to provide operations cost for the shelter.
DIMH &Central Delaware Housing Collaborative
CDBG funds will be used to renovate an existing building that will service homeless women
and children.
Milford Housing Homeowner Rehabilitation/Emergency Home Repair Programs
CDBG funds will be used to rehabilitate and complete emergency home repairs to existing
owner-occupied homes found in violation of the City’s Housing Code.
Analysis of Impediments (Fair Housing Plan)
The City has collaborated with Delaware State Housing Authority, Kent County, Dover Housing
Authority, New Castle County and the City of Wilmington to complete a Fair Housing Plan for
the State of Delaware that will be submitted to HUD in October 2019. The Draft Plan was
completed in late July and is currently under review by the Consortium.
Página 13
Parks, Recreation, and Community Enhancement 8/13/2019
Status of FY-19 Program Funds - Fiscal Year 7/1/19- 6/30/20
2019 Grant Projects Project Details Total Grant Funds Expended Unencumbered Balance
Funds will be utilized for
settlement assistance for
Homeownership Assistance Program $97,845 $97,845
properties purchased in
the City
Funds will be utilized to
renovate a building for
Central DE Housing Collaborative $40,000 $40,000
homeless women and
children
Funds will be utilized for
Dover Interfaith Mission for Housing utility and maintenance $30,000 $30,000
cost for the shelter.
Funds will be utilized for
Milford Housing Development Corp $33,000 $33,000
emergency home repairs.
Funds will be utilized for
Milford Housing Development Corp rehabbing owner $25,000 $25,000
occupied homes.
Total $225,845 $225,845
Página 14
City of Dover
PO Box 475
Dover DE 19903-0475
Phone: (302)736-7005
E-Mail: dmitchell @dover.de.us
MEMORANDUM
To: Donna Mitchell, City Manager
From: Matt Harline, Assistant City Manager
Kirby Hudson, Parks & Recreation Director
Date: August 7, 2019
Subject: Recommendations for Dover Park
City Council reviewed the Dover Park Master Plan in August of 2018. The City Staff recommends
that the City proceed with the “Final Concept” with a Splash Pad and small building and, if funds
and space can be found, a Can-Do Playground.
The City hired the firm of Whitman, Requardt & Associates (WRA) to develop a Master Plan for
the Dover Park, the City’s third largest park. WRA initially presented two alternative concepts,
but after a public process presented the “Final Concept” to City Council in August of 2018. City
Council has had other options presented by members of the Community since then. Staff has been
asked to return with options and a preferred recommendation. The City still believes the Final
Concept is the best alternative.
If City Council wishes to include a recreation building, a Splash Pad and a Can-Do Playground in
the adopted Final Dover Park Master Plan, staff believes that a modified version of the Final
Concept should be chosen. The Final Concept is attached here, on the poster board on display in
the Council Chambers and slide 2 in the presentation. If City Council wants a Splash Pad, building
and a Can-Do Playground; City staff believes that the Splash Pad should be placed as shown in
the Final Concept where the Can-Do Park or Splash Pad is suggested as there is access to utilities.
The building will need to be built in this vicinity as well as shown in the Final Concept. Staff will
need to investigate if the Can-Do Playground can be fit in the area just north of the existing
playground. Having the existing playground and the Can-Do Playground together is optimal to
allow families and friends with different abilities to be closer together.
Alternately the Can-Do Playground could be placed on the south side of the access road
where the “Large Nature Play Area” is shown in the Final Concept and the Splash Pad
would go where the Can-Do Park is shown. This would also require cutting down several
large trees and relocation of part of the Disc Golf Course.
Water, sewer and electric service is required for the building or for the Splash Pad. Placing either
a building or a Splash Pad further to the south (deeper into the park) will require extension of water
and sewer. The Can-Do Playground is probably the best candidate for grant funding.
Página 15
DOVER PARK FINAL CONCEPT
d
R oa
Oak
e
hit Enhance Main
W Entrance
Pond
Enjoyment Area
Thin Understory and
Remove Invasives
Exis
tin
g
Sid
alk
ew Enhance
Access
ne
Existing Parking Point
rn La
and Driveway
Crushed
Aco
Stone
Keep Trail Vegetation Removal
Playground Limited to Along Trail
2 Classroom with
Can-Do Restroom Building
Playground and Sidewalk
or Splash Pad
alt
ph
Existing As
Nature Play
Pavilion il
Area Within Tra
Add Access
Existing Trees
from Acorn
Lane
Nature Bench
Existing
Water Play (Typical)
Pavilion
Stone Trail
Maintain and shed
Skate Relocate Cru
Disc Golf
Tr a
Maintain il Course
Soccer Existing
Add Access Field Water Tower
Point for
Existing Parking
Mapleton Square
and Driveway
and The Laurels
Vegetation
Removal
Thin Understory and Limited to
Evergreen
Remove Invasives Along Trail
Forest Preservation
(Remove
Low Limbs)
l
rai Maintain
eT Community
ton Garden and
dS Enhance
he
us
Cr Buffer
n
alt Nixo
ph
Maintain As
Lane
Existing Softball Field
Trail
Parking
Wi llis p
Resurface
As Basketball
ha Courts
ad lt T
Ro rail
Existing
Portable
Toilets
Resurface
Tennis Courts
Enhance South Entrance
and Add Signage
City of Dover Parks & Recreation Dover Park Master Plan vi
Página 16
Dover Park
Master Plan
Originally Presented August 28, 2018
Where we are today
Página 17
DOV E R PA R K FINAL CONCEPT
Dover Park
Master Plan
Presented to Committee as a
Whole on August 28, 2018
Began implementation of plan
in January 2019
2
Página 18
Dover Park Master Plan – 2018
HIGH PRIORITY FACILITIES
Short Term (0‐5 years) Element Sections
Element Description
Public feedback favored a loop trail system but there was concern for the amount of asphalt trails and disturbance within the
wooded areas. For the final concept, an ADA accessible asphalt loop trail was selected with crushed stone/gravel secondary
connection trails. The asphalt trail from the main entrance to the existing playground was eliminated, the main trail in the
evergreen forest was moved along the perimeter to minimize forest impacts, and the alignment within the hardwood forest was
Paved Loop Trail adjusted to use the existing abandoned asphalt area and avoid crossing the ditch. Potential for bicycle racks, fitness stations,
System benches, etc. to be added along trail and at intersections.
Resurface Existing Public feedback encouraged preserving and enhancing existing facilities within the park. Resurface and repaint existing tennis
Courts courts (3) and basketball courts (2). Repaint tennis court lines to include pickleball. Repair or replace broken nets, if any.
Due to the amount of vegetation clearing for a new parking lot and an asphalt trail from Acorn Lane and the park currently having
adequate parking, the parking lot addition was not selected for final design. A pedestrian access point and crushed/stone trail was
selected to provide access from Acorn Lane to minimize environmental impacts. Similar trail treaments were selected for access
Park Entrances and points from Mapleton Square and Manchester Square. Trim and remove of vegetation around entrances and on fencing to improve
Enhancements visibilty to park. Replace main entrance sign. Add smaller park signs for all other entrances.
This action is a top priority for safety and better utilization of the park. Thinning of undergrowth and clearing of invasive vegetation
Vegetation near the existing entrances, all proposed entrances, along proposed trails and through the middle of the park to improve user
Management visibility.
Security Camera At least three security cameras funded, placed and monitored by Dover Police Department.
3
Página 19
Dover Park Master Plan - 2018
FINAL PREFERRED CONCEPT ‐ DOVER PARK CAPITAL IMPROVEMENT LIST
Phase 1 (0‐5 yrs.)
Phase I Quantity I Improvement I Approximate Unit Cost Total Cost
Pathways, Trails, and Circulation
1 I 0.75 Miles IAsphalt Paved Trail I$45,000 per 1/4 mile $135,000
1 I 0.25 Miles IGravel/crushed stone trail (8' wide) I$15,000 per 1/4 mile $30,000
1 I 5 IPark Entrance Enhancements I$7,000 each $35,000
sub‐total $200,000
Athletic Facilities
1 I 3 IResurface Tennis Courts I$10,000 each $30,000
1 I 2 IResurface Basketball Courts I$10,000 each $20,000
sub‐total $50,000
Vegetation Management
1 I 6 IClearing Undergrowth I$8,000 per acre $60,000
1 I 5 IRemove Large Specimen Trees I$3,000 each $15,000
sub‐total $75,000
Park Security
1 I 3 ISecurity Cameras I$7,500 camera + $7,500 pole $45,000
sub‐total $45,000
Total Improvements $370,000
Estimated Engineering costs (15%) $60,000
5 year maintenance costs (includes current costs) $70,000
Approximate Phase I Cost $500,000
Menu of Potential Additional Improvements
Splash Pad (accommodates 20‐30 Kids) $250,000
Can‐Do Playground $195,000
Indoor Classroom with Restrooms $165,000
Linear Skate Obstacles (1000 SF) $65,000
Nature Play Area $40,000
Community Garden (with fence) $35,000
Park benches (10) $20,000
Pond Enhancement/Enjoyment Area $20,000
Wildlife enhancements (i.e. birdhouses, bat boxes, view scopes) $6,000
Fix and Maintain Frisbee Golf Course $6,000
Anticipated Available Funding Phase 1
FY 2018‐2019 $140,000
FY 2019‐2020 $125,000
FY 2020‐2021 $125,000
FY 2021‐2022 $125,000
FY 2022‐2023 $125,000
total $640,000
4
Página 22
Accomplishments
Before Start of Project After Vegetation Removed
7
Página 23
Before We Started
Among all the parks in the Dover City system, Dover Park
is known and loved by many for its trees and woodlands.
A majority of participants in the master planning process
expressed their affinity for the natural feel of the park.
Stakeholders also strongly support enhancing the
Existing softball field with field lighting Existing basketball courts with faded court lines and Existing chess tables with playground (ages 2-5) and
existing recreational facilities currently in Dover Park.
leaning backboard bench in foreground. Additionally, they desire to protect the environmental
assets above infrastructure development that would
heavily disturb or diminish these features. During the
design team site visit and part of the site analysis and
inventory effort, the elements that make up Dover Park
were identified, inspected and an action to implement
as part of the vision for Dover Park was assigned to each
element.
Pavilion near the playground with six picnic tables - some Existing tennis courts with worn surfaces Multi-purpose field with evergreen trees in background
picnic tables missing parts
CURRENT MAINTENANCE AND OPERATIONS
City of Dover Public Works is currently in charge of
managing all City owned parkland in Dover. Public Works
is also responsible for maintaining local roads and
stormwater facilities within the City. Tasks at Dover Park
include trash receptacle and general debris collection,
Disc golf course tee marker with faded signage Existing playground equipment and benches
Existing vehicular access within the forested area setting up soccer nets, removing fallen tree limbs,
mowing lawns, and responding to resident calls for park
maintenance requests. Dover Police currently opens and
closes the vehicular access gate and does a drive
through the park. The City doesn’t currently have an
official maintenance plan for Dover Park.
-\ 8
Disc golf basket within the evergreen forested area Existing pavilion with one picnic table in the forested area vegetation that creates poor user visibility
Página 24
Concept Accomplishments
Priority Services was selected to remove the heaviest of vegetation (ditch only)
Hired a Park Maintenance Crew of three (this crew serves all the parks)
Pond Enhancements completed
Security Camera Installation one camera installed
Disc Golf Course Baskets and Signage Refreshed completed
Engineered Wood Fiber Added to Surfacing of Playground Equipment completed
Outdoor Game Tables Refurbishment completed
Basketball Court Refurbishment anticipated completion August 10, waiting on blacktop to be scheduled
Tennis Court Fencing Repairs completed Aug. 8
Tennis Court Surface Cleaning anticipated completion Aug. 9
Entrance Enhancements to White Oak Road entrance started completed Aug. 9
Programming in the Park – Movie Nights and Tuesdays in the Park were planned for the summer of 2019
Asphalt Trail - Pre-Application Submitted and Accepted to Outdoors Parks & Trails grant (DNREC) to complete a section of
the proposed asphalt trail (Grant application due in September)
10 Benches – planning stage
Splash Pad – planning stage
Can Do Park – planning stage
9
Permanent Restrooms – planning stage
Página 25
City of Dover, Delaware
Governing Policy
For
Energy Commodity
Risk Management
Effective: August 27, 2019TBD
Approved by: City of Dover Council
(Last Revision August 28, 2017)
Página 26
TABLE OF CONTENTS
PURPOSE OF THE RISK MANAGEMENT POLICY ..................................................................4
A. Introduction ....................................................................................................................4
B. Scope of Policy ................................................................................................................4
C. Objectives and Risk Philosophy ...................................................................................5
D. Policy Administration....................................................................................................5
MANAGEMENT AND CONTROLS .............................................................................................6
A. Utility Committee of The City Council .......................................................................6
B. Executive Risk Management Committee ....................................................................6
1. City Manager ................................................................................................................. 8
2. Director of the Utility .................................................................................................... 8
3. Controller........................................................................................................................ 8
4. TEA Client Services Manager ...................................................................................... 9
DISCUSSION OF RISKS ...............................................................................................................9
MARKETING AND TRADING PRACTICES ....................................................................111110
A. Standards of Conduct ..........................................................................................111110
B. Products, Activities and Limitations .........................................................................11
C. Contract Documentation and Confirmations...................................................121211
D. Training..........................................................................................................................12
E. New Product Protocol .................................................................................................12
RISK LIMITS AND RISK MEASUREMENTS ...................................................................131312
A. Limits......................................................................................................................131312
1. Delegation Authority .......................................................................................... 131312
2. Volume Limits ............................................................................................................. 13
3. Locational Limits ......................................................................................................... 13
B. Stress Testing and Back Testing .................................................................................13
C. Instances of Exceeding Risk Limits....................................................................141413
CREDIT POLICY ..................................................................................................................141413
A. Measuring Credit Risk .................................................................................................14
B. Analysis and Extension of Credit Limits ..................................................................14
C. Instances of Exceeding Credit Limits ........................................................................15
REPORTING .................................................................................................................................15
A. Risk Reporting ..............................................................................................................15
B. Credit Reporting ...........................................................................................................17
C. Hedge Effectiveness Reporting ..................................................................................17
2
Página 27
INFORMATION TECHNOLOGY SYSTEMS ............................................................................17
POLICY DISTRIBUTION AND COUNSEL .......................................................................181817 -
A. Distribution Outside The City ....................................................................................18
B. Designated Counsel .....................................................................................................18
APPENDIX A – Approved Products .............................................................................................19
APPENDIX B – Approved Counterparties and Threshold Tables ................................................20
APPENDIX C – Business Risks ....................................................................................................25
APPENDIX D – Glossary ..............................................................................................................26
APPENDIX E – Swap Transaction Representative .......................................................................28
3
Página 28
PURPOSE OF THE RISK MANAGEMENT POLICY
A. Introduction
The City of Dover (“City”) and its customers are routinely exposed to energy price risk,
volume variability risk, basis risk and credit risk – herein referred to collectively as
energy commodity risk - in the normal conduct of serving its electric load requirements.
Volatility of energy commodity prices and volumetric uncertainty (either
supply/generation or load obligations) impose a substantial and direct risk to the City’s
financial and operating performance.
By authority of its charter, the City has responsibility for overseeing the City’s
electricity operations, including the management of its cost of serving Dover’s
customers. By agreement dated May 6, 2011 July 2, 2019 and approved by the City (the
“Energy Management Agreement EMA”), the City has engaged The Energy Authority,
Inc. (“TEA”) to assist the City with Asset Management and Strategic Planning Services,
Risk Management Services, and Energy Management Services.
This Policy for Energy Commodity Risk Management (“Policy”) is established the
explicit understanding that the City has retained and delegated responsibilities to TEA
to provide Risk Management Services.
Additionally, the City has issued this Policy for dealing with the philosophy,
framework and delegation of responsibilities necessary to govern activities related to
Dover’s energy commodity risk management. As set forth herein, the City has
established an organizational structure, delegated responsibility and established
internal controls and procedures to ensure that all transactional and oversight activities
are conducted in compliance with this Policy and in accordance with the City’s normal
reporting, legal, financing and regulatory requirements relating to energy assets and
transactions.
B. Scope of Policy
This Policy covers all transactions entered into the by the City of Dover designed to
meet the City’s electric load requirement and the management of risk related to these
transactions.
In the event of conflict between this Policy and the EMA, the Policy shall control.
This Policy is separate and distinct from enterprise risk management policies and
procedures addressing the City’s safe operation of its generating stations and energy
infrastructure, insurance requirements, permit compliance, employee matters
regulatory compliance with laws and regulations of the State of Delaware and Federal
4
Página 29
Agencies such as EPA, FERC, NERC and CFTC or other potential risks to the City
beyond the purchase and sale of fuel and electric power and its ancillary products.
C. Objectives and Risk Philosophy
The objectives of the Policy are to identify energy commodity price and credit risk
exposures and give the City a framework for the quantification and management of
these exposures. The Policy will identify the reports needed to convey how the
identified risk exposures can potentially impact the City’s overall cost of providing
electricity service to its customers and report on the risk management of the
transactions associated with City’s electric load requirements.
Under the Policy, risk management activities will be conducted consistent with the
City’s overall objective of appropriate risk mitigation. There are several objectives of
the Policy which, when taken and executed together, serve to manage the City’s energy
commodity price exposures. Specifically, the Policy:
Establishes framework for developing credit limits for counterparties and quantifies
and manages the credit exposures related to potential counterparty abrogation
Quantifies the impact of the above exposures on City’s financial results
Manages the impact of the above exposures in line with the City’s identified level of
risk tolerance
Provides clear delineation of responsibilities and authority, outline a separation of
duties, and ensure reporting of risk is timely and accurate.
Ensures that the impact of any action affecting the City’s position is consistently
quantified, monitored and authorized.
The City’s risk management activities will be conducted consistent with its overall objective of
appropriate risk mitigation and never for purposes of speculation.
D. Policy Administration
This Policy has been approved by the Executive Risk Management Committee and The
Utility Committee of the Dover City Council. The Utility Committee must approve
modifications to the Policy with the exception of the appendix information which can
be modified with the approval of the Executive Risk Management Committee.
5
Página 30
MANAGEMENT AND CONTROLS
This Policy articulates the management and organization of the City and TEA to serve
as a control framework outlining delegation of duties and responsibilities.
A. Utility Committee of The City Council
The Utility Committee of The City Council (The Committee) has a responsibility to
provide approval of this Policy. With this approval, The Committee also assumes
additional duties. They will understand the risks the City is and could be exposed to
due to their energy commodity risk management activities. In this role, the Committee
will have a responsibility to also understand the City’s policies and procedures, internal
controls and systems which are used to help manage the City’s energy commodity
risks.
The Committee will approve any amendments to the Policy or limits within. The
Executive Risk Management Committee will update the Committee periodically
regarding the Policy and its functions. It will be the Committee’s responsibility to:
Discuss guidelines and strategic policies that govern the process by which the
Energy Risk Management Committee assesses and manages risks
Review and approve any recommended changes to the the risk policy at least
annually
Approve new members and alternates of the Executive Risk Management
Committee
Acknowledge the risk inherent in transactions covered under this Policy
B. Executive Risk Management Committee
An Executive Risk Management Committee (“ERMC”) has been formed to provide
executive management oversight for the City’s energy commodity risk management
activities. The ERMC is charged with the creation, amendment and administration of
this Policy, including acquiring any approvals required by the Utility Committee, and
will ensure that all energy commodity risk management activities of the City are
performed consistent with this Policy. The ERMC will meet at least monthly to review
compliance and conduct its business as described in this Policy.
The ERMC shall be comprised of the following voting members: The City Manager, The
Director of Utility, The City’s Controller and TEA’s Client Service Manager.
The City’s ERMC will make decisions following the process outlined in this Policy.
TEA’s Client Services Manager may include representatives from other areas within
TEA in the monthly ERMC meetings who will attend in person or by conference call as
6
Página 31
non-voting advisors. Other City employees and TEA staff may also be asked to attend
meetings from time-to-time, as the ERMC deems necessary. The responsibilities of the
ERMC shall include:
Establish scope and frequency for management reporting to the Utility Committee.
No less than annually, review the City’s Energy Commodity Policies and Procedures
for correctness and completeness.
Review and approve any new risk report or change to an existing risk report
provided by TEA to monitor risks outlined in this Policy.
Understand and approve any models, methodologies, and assumptions used for
measuring risks such as volume risk, process risk, counterparty risk and commodity
risk.
Monitor the City’s risks and ensure they are within the limits and are being
managed according to what is indicated within the City’s Policy and associated
procedures
Understand the City’s risk management objectives and risk tolerances.
Review and approve the risk management and trading strategy programs and
associated risk. Each program should be reviewed to ensure alignment with Policy
objectives and compliance with risk limits within this Policy.
Periodically review any risk management program approved in light of recent
market changes, and ensure continued compliance with its established guidelines
Review and approve new products, markets, trading counterparties and credit
limits
Review all violations and exceptions to this Policy and report such to the
Committee.
Approve the individuals or companies that engage in the City’s commodity
transactions and are subject to the limits within this Policy.
Ensure that the individuals or companies authorized to transact on behalf of the City
as well as manage its risks, are appropriately trained and qualified.
Ensure independence and segregation of duties between front, middle and back
office at TEA.
Recommend changes to this Policy to the City’s Utility Committee for approval and
ensure the Utility Committee understands the City’s overall compliance with this
Policy and associated procedures.
The ERMC will meet at least monthly to review risks identified and reported on by
the Policy, this meeting shall be chaired by The City Manager. Minutes of each
meeting of the ERMC shall be recorded and reflect any decisions and follow-up
action items to be performed. These minutes will be reviewed and approved by the
members of the ERMC in a timely manner.
7
Página 32
Each member of the ERMC has a unique role as defined below:
1. City Manager
The City Manager is independent of all commercial functions and carries the
responsibility of establishment and maintenance of risk management for the City. The
City Manager will be a voting member of the ERMC and act as a chair of the ERMC.
Other responsibilities include:
Ensure this Policy is maintained.
Oversee reviews of the City’s energy commodity risks, limits, risk measurement
methodologies and models, and programs and recommend changes to the ERMC.
Ensure potential transactions and their impacts on the City’s risks and limits defined
within this Policy.
Develop and monitor the implementation of the Policy, and oversee other risk
management processes and procedures established by this Policy or otherwise by
the ERMC.
The City Manager shall name an Alternate to be approved by the Committee.
2. Director of the Utility
The Director of the Utility has oversight for all trading, hedging, pricing, structuring,
and market and operational risk management activities associated with the City. The
Director of the Utility will be a voting member of the ERMC. Other responsibilities
include:
Review the effectiveness of transaction processing systems and procedures relating
to risk measurement.
Recommend operational risk and business risk assessment guidelines.
The Director of the Utility shall nominate an alternate to be approved by the
Committee.
3. Controller
The Controller is independent of all commercial functions and carries the oversight
responsibilities associated with the City’s accounting practices. The Controller will be a
voting member on the ERMC. Other responsibilities include:
Perform financial accounting including accounting for hedging and derivatives
activities.
Comply with tax rules and make appropriate tax elections.
Record realized and unrealized gains and losses.
8
Página 33
Reconcile general ledger, cash transactions and margin accounts.
Implement tax-hedge accounting policies and other regulatory tax requirements.
Develop and maintain documentation outlining standard procedures for conducting
business.
Invoice counterparties and resolve billing disputes.
Perform daily/weekly/monthly transaction checkout with counterparties.
Develop and maintain documentation outlining standard procedures for conducting
business.
The Controller shall nominate an alternate to be approved by the Committee.
4. TEA Client Services Manager
The TEA Client Service Manager roles and responsibilities are defined Eexhibit B of the
EMA between the City and TEA. The TEA Client Service Manager will be a voting
member on the ERMC and act as chair of the ERMC in the absence of the City Manager.
Other responsibilities include:
Monitor risk reports between ERMC meetings.
Report to the Committee and the ERMC on the City’s adherence to all limits and
functions within this policy.
Engage the ERMC in discussions regarding events or developments that could
expose the company to potential losses.
Recommend to the ERMC specific risk limits consistent with the City’s risk
management objectives, risk tolerance, and risk management policy.
Coordinate and distribute independent market fundamental analysis.
Provide advisory support and recommendations as specified in Article 5 of the
EMA.
Update RMC on training of TEA employees.
TEA shall nominate an alternate to be approved by the Committee.
Alternates may vote, but only in the absence of the voting member for whom
they serve. A person may serve for an alternate for more than one official, but they can
only cast one vote. A quorum for a meeting shall be any combination of three voting
members and alternates. A simple majority of votes is necessary to approve any action
of the ERMC, but at least two voting members must approve the action. Members and
alternates may attend by electronic means and count as present for the purpose of
quorum and for a majority for a decision.
DISCUSSION OF RISKS
This Policy covers the management of all material energy market risks faced by the City. A
comprehensive list of risks that are or could be relevant to City is shown in Appendix C of the
9
Página 34
Policy. Among the most critical of these risks are commodity risk, counterparty risk, process
risk, volume risk, and budget risk. These risks are measured by the limit structure and controls
outlined in the Policy.
Commodity risk represents the potential adverse impacts to the value of the City’s
portfolio due to changes in the market. Commodity risk encompasses volatility risk,
forward price risk, basis risk, correlation risk and liquidity risk.
Counterparty risk represents the potential losses the City could incur due to delivery
risk and receivable risk. Delivery risk stems from a supplier or trading counterparty
that is unable or unwilling to perform on its commitments including but not limited to
delivery or receipt of commodities. Receivable Risk includes the City’s risk associated
with a counterparty’s timeliness of payment for services rendered.
Process risk represents the risks associated with process problems including, but not
limited to, inaccurate data capture, untimely trade execution or settlement problems.
Controls over process risks are embedded in the organizational structure of TEA
through the design processes and operating procedures.
Volume Risk represents the potential for unforeseen changes from projections of excess
or shortfall of capacity or energy from the actual needs. When variances are large
coupled with large costs to transact and adverse moves in market prices this risk could
be realized. In management of this risk, the City must be aware of the fact that
unexpected variations in volume are often highly correlated with price movements.
Budget Risk represents the potential to deviate outside of tolerable bounds of the City’s
budget. Deviations from budget can be caused by forecast error or unforeseeable
adverse changes in market prices.
Regulatory Risk arises from participation in regulated markets. With the Independent
System Operator (ISO) implementation of Federal Energy Regulatory Commission
(FERC) Order 741, the City faces increasing regulatory risk when participating in
wholesale energy markets. The TEA Compliance department works in conjunction
with the TEA Risk Control department to help the City manage regulatory risk.
Regulatory risk is managed by:
Annual Compliance Training for all employees participating in regulated markets;
Integration of the appropriate compliance culture within the Trading department
through ongoing interaction between Compliance and Trading;
An independent monitoring and exposure measurement on transactions that could
trigger an increase in regulatory risk.
10
Página 35
MARKETING AND TRADING PRACTICES
A. Standards of Conduct
Individuals authorized to transact for the City shall not misrepresent, conceal or
withhold information regarding energy commodity trading and risk management
transactions to any person responsible for the accurate recording and/or reporting of
such transactions; participate in any such transaction or similar activity for the benefit
of any party other than the City; or hold or be a beneficiary of any financial interest in
any entity with which the employee is engaged in trading or other business activity
(other than ownership of an interest in a mutual fund managed by another party).
Further, no employee authorized to place or execute such transactions may engage in
trading power or energy commodities derivative instruments for his or her personal
account.
B. Products, Activities and Limitations
Pursuant to achieving the City’s core objectives for the purpose of energy commodity
risk management, the following limitations shall apply.
Permissible instruments will be restricted to the products and instruments specified
in Appendix A – Approved Products of the Policy;
o All physical forward transactions shall be governed by the Edison Electrical
Institutive (EEI), North American Energy Standards Board (NAESB), or
similar agreements with counterparties approved by the City.
o The City reserves the right to enter into financial hedge transactions to
effectuate Policy objectives, but does not authorize TEA to enter into financial
hedge transactions on its behalf. Any such financial transactions that the City
may enter into shall be governed by ISDA agreements with counterparties as
approved by the City.
The maturity for each permissible instrument will be restricted to the maturity limits
specified in the risk limits section of the Policy.
Transaction volumes for each risk management transaction will be restricted to the
amounts specified in the Risk Limits section of the Policy.
Risk management transactions will be outlined in the City of Dover Hedge Program
which will be approved by the ERMC. Risk management transactions may include
the following:
o Hedging the forward price of purchased power for delivery to the City as
needed to meet its electric load requirements.
o Hedging the forward price of natural gas and fuels as needed to generate
power to meet the City’s electric load requirements.
11
Página 36
o Unwinding of hedges to accommodate changes in expected load
requirements, or for economic reasons subject to explicit constraints set by the
ERMC.
C. Contract Documentation and Confirmations
No over-the-counter transaction may be executed until an EEI, NAESB, or similar
agreement has been authorized by the City, approved by the ERMC and fully executed
by the parties.
Written confirmations will be required from counterparties, as defined in the Master
Service Agreement between the City and counterparty, within one business day or such
longer time as required by the contract in question for all risk management transactions.
Contemporaneous with any commitments and prior to receipt of written confirmations,
verbal commitments shall be memorialized internally as to instrument structure,
quantity, relevant time horizon, price and any other relevant terms; such internal
documentation shall be time stamped and correlated to the ultimate written
confirmation to or from the counterparty. Both the internal documentation as well as
the written confirmation from the counterparty shall be provided to TEA’s Risk Control
Group immediately upon receipt for verification.
In the event that there is a material failure to provide timely documentation or
confirmations, then at the City Manager’s sole discretion, the offending individual’s
authorization may be suspended. Similarly, if the failure to provide timely
documentation or confirmations is due to the failure of counterparty, then at the
discretion of the City Manager, a moratorium may be imposed on transactions with that
counterparty. In such cases, the City Manager shall notify the ERMC of the issues
leading to the suspension or moratorium shall.
Nothing herein shall inhibit the City Manager from bringing control issues to the TEA’s
Client Services Manager prior to a decision on materiality or the imposition of a
suspension of trading privileges or counterparty moratorium.
D. Training
The ERMC will ensure that all City employees and/or TEA Staff that will execute
transactions on behalf of the City will have appropriate training in the markets in which
the transactions occur.
E. New Product Protocol
12
Página 37
As required to manage the City’s energy commodity risk the ERMC shall approve new
products provided the requirements of the New Product Approval Procedure are met.
RISK LIMITS AND RISK MEASUREMENTS
A. Limits
The limit structure is designed to quantify the types of risk in the City’s energy
commodity portfolio. The City will manage and report on its energy commodity market
risk using Delegation of Authority Limit, a Volume Limit and a Locational Limit.
1. Delegation Authority
The Utility Committee delegates authority to the Dover ERMC to approve the acquisition
of electric energy, capacity and/or transmission according to the following approval
authority limits to the Dover ERMC for expenditures or terms. The ERMC may not
delegate these authorities to individuals authorized to commit Dover to financial
obligations.
Position Maturity Limit Term Limit Notional Value Limit
Dover ERMC 5 years 5 years 20,000,000
TEA 1 month 1 month 1,000,000
This limit structure is not intended for use when transacting day-ahead and real time in
the PJM market.
2. Volume Limits
For no reason should a transaction be executed that exceeds the City’s electric load
requirements. If there is an adjustment to the City’s electric load requirements and the
existing transactions greater than 100% of the adjusted electric load requirements the
ERMC will review and approve the offsetting strategy deployed in sufficient proportion
to mitigate the encroachment.
3. Locational Limits
Non-Commodity Transactions must support the requirement of one of the City’s
generation units, native load or transaction locations.
B. Stress Testing and Back Testing
13
Página 38
The City’s positions shall be periodically stress tested and models shall be back tested.
The processes around these tests are outlined in the Stress Testing and Back Testing
Procedure.
C. Instances of Exceeding Risk Limits
Should the City or TEA enter into a transaction that causes the portfolio to exceed any
above mentioned limits the Director of the Utility shall, in addition to notifying the
ERMC, also notify the Chair of The Committee as soon as practicable and shall provide
periodic reports to the Chair on the status the transactions for as long as the City is
exceeding its limits. The ERMC will review and determine whether any liquidation or
offsetting of transactions is warranted. The incident will be documented as a Policy
Exception by the Director of the Utility.
CREDIT POLICY
Credit Risk is the risk due to the uncertainty in a counterparty’s ability to meet its
contractual obligations. The primary objective of this credit policy is to mitigate, to the
extent commercially reasonable, the credit risks associated with transactions covered in
this Policy while still allowing the City to achieve its objectives.
A. Measuring Credit Risk
The status of credit risk will be measured and reported through reports provided by
TEA.
The current credit exposure will be reported at the agreement level via a Counterparty
Credit Report provided by TEA. This information will be made available in real time to
TEA trading personnel so that it can be checked prior to executing transactions for the
City. Those responsible for risk oversight at the City and TEA will have access to this
information no less frequently than once per day. The ERMC will monitor overall
credit utilization and any credit exceptions at least monthly. When measuring the
current credit risk, netting will be applied to the exposure if the City’s contract with a
counterparty includes provisions for netting.
B. Analysis and Extension of Credit Limits
Physical and financial commodity transactions will be executed with counterparties
approved by the ERMC with credit available to support the transactions. The
creditworthiness of a counterparty will be determined by both qualitative and
quantitative factors. Factors shall include, but not limited to:
A company’s debt credit ratings provided by the rating agencies.
14
Página 39
Financial data such as an analysis of the income statement, balance sheet, and cash
flow, as well as liquidity and capital structure.
Subjective factors such as company’s fuel diversity, overall size, risk management
policy and internal controls, geographic diversity, and market intelligence.
A credit limit is the amount of unsecured credit granted to a counterparty. Unsecured
credit exposure includes amounts owed by the counterparty, whether billed or not, and
the mark-to-market differences in value of any collateral which the counterparty has
provided the City. Any net exposure above the collateral threshold will require the
posting of collateral by a counterparty. Further information on the City’s procedure for
establishing credit is contained in the Counterparty & Credit Review Process.
Collateral thresholds, term limitations and credit exposure limits will be subject to the
maximums indicated in Appendix B, based upon the lower of the S&P and Moody’s
credit ratings.
At no time will the City incur a credit exposure with any counterparty greater than
$60,000,000.
C. Instances of Exceeding Credit Limits
The City and TEA are restricted by the credit limits approved by the ERMC. The ERMC
can suspend trading with a counterparty, if that counterparty’s credit limit has been
reached or exceeded. The City or TEA traders shall not exceed the Counterparty
Credit Limit by executing transactions with any counterparty without approval of the
ERMC.
The ERMC will determine when it’s appropriate to require additional collateral if a
counterparty’s credit exposure exceeds its credit limit. Collateral includes standing
letter of credit, cash, and prepayments.
All credit exceptions will be documented and reported to the ERMC and the Committee
as Policy Exceptions.
REPORTING
A. Risk Reporting
Preparation of timely reports is critical to monitoring risk. TEA will furnish the
required reports on a regular frequency for the City in a format acceptable to the ERMC.
In addition, the ERMC and its designees will be provided access to the City’s risk
reports as updated daily via TEA’s secure Web Portal.
15
Página 40
Reports required on a monthly basis and for periodic meetings of the ERMC include the
following:
Profit and Loss Report
The Profit and Loss (P&L) Report shows the daily realization of transactions at either
the transaction price or the market price as transaction roll from unrealized to realized.
This report should show volumes, transaction prices and market prices of realized
physical and financial power and fuel transactions.
Mark to Market Report
The Mark to Market (“MTM”) Report conveys the potential transaction exposure, of all
existing forward transactions executed, if the energy commodity portfolio was
liquidated at the most recent market settlement prices. This report should show
volumes, transaction prices and market prices of unrealized physical and financial
power and fuel transactions.
Daily Activity Report
The Activity Report presents a summary of the day’s trades executed in the bilateral
energy market.
Cost of Service Report
The City’s exposure to energy price risk shall be monitored and reported on a Cost-of-
Service basis. All calculations are at the wholesale level. The Cost-of-Service recognizes
all prior (expired) months within the Power Year on the basis of actual (incurred) costs,
and recognizes all forward (pending) months within the Power Year on the basis of
expected forward power and fuel prices and expected forward load-following risks. As
defined below, the Cost-of-Service is an aggregation of Forward Energy Commodity
Portfolio Cost, the Load Following Cost Expectation and the City’s Budget Target for
Purchase Power Expense.
o The Net Purchased Power Cost shows the net cost of all physical and financial
transactions related to the City’s anticipated commodity requirements for power
and fuel and is based on the price of all hedge transactions plus the forward
market price of all unhedged transactions valued at current forward prices for
energy commodities, customer-level cost per MWH of all physical and financial
transactions related to Dover’s actual plus anticipated energy.
o The expected fixed costs defined as load-serving entity (LSE) capacity costs,
transmission costs and TEA management fees.
o The Expected Load-Following Cost for a specified power year is defined as the
expected cost (or revenue) associated with intra-month load variations due to
weather or other events affecting demand. TEA has completed a historical
analysis to measures the effective monthly average unit cost paid for Dover’s
PJM Wholesale Load Responsibility (WLR) was calculated for each month since July
16
Página 41
2013. From this analysis, TEA recommends using the post-Garrison results as a proxy
for future estimates of the WLR and as an estimate of the Load Following Cost to be
used for estimating the City’s Forward Cost-of-Service Report. The ERMC will
update the Expected Load Following estimate while lack of necessary market
information persists no less than annually.
o For the historical payment analysis, an effective monthly average unit cost paid for Dover’s
PJM Wholesale Load Responsibility (WLR) was calculated for each month since July
2013. This effective unit cost was constructed using Dover’s monthly PJM load payment
(Dover Budget line item: PJM – Energy, Congestion & Losses), adding back the West Hub
hedging credits, and dividing by the WLR. The values pre-Garrison-online and post-
Garrison-online were compared with both straight and WLR-weighted averages. This
effective LMP therefore includes the effects of intra-month load variations, contributions
of both the DALMP and RTLMP, and the additional PJM charge types reflected in the
monthly Dover Budget line item: PJM – Energy, Congestion & Losses. Pre-Garrison (July
2013 – May 2015) weighted average monthly load costs were $3.02, while the average
post-Garrison cost (Jun 2015 – Apr 2018) has been $2.60.
o
o The Budget Target for Purchase Power Expense represents the City’s view of
expected purchase power expense.
B. Credit Reporting
Counterparty Credit Report
The Counterparty Credit Report conveys the exposure to all counterparties with which
the City has credit exposure resulting from its energy commodity risk management
activities.
CFTC Reporting
The City understands that transacting over the counter (OTC) swaps carries an
additional Commodity Futures Trading Commission (CFTC) reporting function. Once
required by the CFTC, the City will report on how the City generally meets its financial
obligations associated with entering into non-cleared swaps in a manner acceptable to
the CFTC.
C. Hedge Effectiveness Reporting
If the City’s transactions require a hedge effectiveness test, those testing results will be
reported to the ERMC no later than one month after the end of the financial reporting
period. The report will include a summary of testing methodology, assumptions of the
testing and the outcome of results with a pass or fail by transaction.
INFORMATION TECHNOLOGY SYSTEMS
17
Página 42
Since information systems play a vital role in The City’s trading abilities, the City shall
ensure that the information systems and technology used to store all transaction
information is maintained and secure. The City’s transactions will be stored in TEA’s
enterprise trading and risk management system. TEA uses the TriplePoint Commodity
XL (CXL) system, integrated with Commodity XL for Credit Risk (Credit Risk). TEA
has assigned a Database Administrator (DBA) that is charged with the database security
and maintenance for the transaction database, CXL.
The following safeguards for data security and backup will be installed:
Transaction data stored in the system of record will be replicated daily to ensure
data redundancy;
The CXL database will be backed up at least daily after the close of business.
POLICY DISTRIBUTION AND COUNSEL
A. Distribution Outside The City
The City’s Policy is restricted to the use of the City and TEA organizations. It shall not
be distributed outside these organizations without the consent the ERMC.
B. Designated Counsel
Questions about the interpretation of any matters of this Policy should be referred to
ERMC. The ERMC will provide clarification and explanation on any updates to this
Policy.
All legal matters stemming from this Policy will be referred to the City’s Legal Counsel.
18
Página 43
APPENDIX A – Approved Products
The following shall constitute a list of approved products to be utilized by TEA to
manage the City’s energy commodity portfolio:
Physical Power
Physical Natural Gas
Physical Residual Fuel Oil (#2)
Capacity
Financial Power
Financial Options
PJM Demand Bids and Generation Offers
PJM InSchedules
PJM Transmission Products
o Financial Transmission Rights
o Annual Auction Revenue Rights
PJM Tier 2 Synchronized Reserves
The above instruments can be executed by TEA on behalf of the City of Dover for the
current and next two successive Power Years (July to June).
19
Página 44
APPENDIX B – Approved Counterparties and Threshold Tables
This Appendix establishes approved counterparties and their Collateral thresholds.
Collateral thresholds, term limitations and credit exposure limits that are subject to the
following maximums based upon the lower of the S&P and Moody’s credit ratings:
Credit Thresholds from Dover Extended to the Counterparty
Exelon Generation Company, LLC
Threshold I S&P I Moody's
$ 60,000,000 AAA Aaa
$ 50,000,000 A- to AA+ A3 to Aa1
$ 40,000,000 BBB+ Baa1
$ 30,000,000 BBB Baa2
$ 20,000,000 BBB- Baa3
$ - Below BBB- Below Baa3
AEP Energy Partners, Inc.
Threshold I S&P I Moody's
$ 10,000,000 BBB- and Above Baa3 and Above
$ - Below BBB- Below Baa3
BP Energy Company
Threshold I S&P I Moody's
$ 60,000,000 AA- to AAA Aa3 to Aaa
$ 45,000,000 A+ A1
$ 30,000,000 A A2
$ 15,000,000 BBB to A- Baa2 to A3
$ - Below BBB Below Baa2
Calpine Energy Services, L.P.
Threshold I S&P I Moody's
$ 25,000,000 AAA Aaa
$ 15,000,000 AA- to AA+ Aa3 to Aa1
$ 10,000,000 A- to A+ A3 to A1
$ 5,000,000 BBB+ Baa1
$ 3,000,000 BBB- to BBB Baa3 to Baa2
$ - Below BBB- Below Baa3
20
Página 45
EDF Trading North America, LLC
Threshold I S&P I Moody's
$ 18,000,000 Fixed Fixed
PSEG Energy Resources & Trade, LLC
Threshold I S&P I Moody's
$ 20,000,000 BBB- and Above Baa3 and Above
$ - Below BBB- Below Baa3
Sequent Energy Management, L.P.
Threshold I S&P I Moody's
$ 5,000,000 Fixed Fixed
Conectiv
Threshold I S&P I Moody's
Unspecified * Above BBB+ Above Baa3
$ - Below BBB- Below Baa3
* Conectiv does not have a defined credit threshold, so for planning purposes, a
$10,000,000 threshold is imposed as a conservative limit
Macquarie Energy, LLC
Threshold I S&P I Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA- to AA+ Aa3 to Aa1
$ 15,000,000 A- to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ - BBB- or below Baa3 or below
Morgan Stanley Capital Group
Threshold I S&P I Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA- to AA+ Aa3 to Aa1
$ 15,000,000 A- to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ - BBB- or below Baa3 or below
21
Página 46
NextEra Energy Marketing, LLC
Threshold I S&P I Moody's
$ 30,000,000 AAA Aaa
$ 25,000,000 AA- to AA+ Aa3 to Aa1
$ 20,000,000 A- to A+ A3 to A1
$ 15,000,000 BBB+ Baa1
$ 10,000,000 BBB Baa2
$ - BBB- or below Baa3 or below
Deutsche Bank
Threshold I S&P I Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA- to AA+ Aa3 to Aa1
$ 15,000,000 A- to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ - BBB- or below Baa3 or below
Barclays Bank
Threshold I S&P I Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA- to AA+ Aa3 to Aa1
$ 15,000,000 A- to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ - BBB- or below Baa3 or below
Credit Thresholds from the Counterparty Extended to Dover
AEP Energy Partners, Inc.
Threshold I S&P I Moody's
$ 10,000,000 BBB- and Above Baa3 and Above
$ - Below BBB- Below Baa3
BP Energy Company
Threshold I S&P I Moody's
$ 30,000,000 AA to AAA Aa2 to Aaa
$ 25,000,000 AA- Aa3
$ 20,000,000 A+ A1
$ 15,000,000 A A2
$ 5,000,000 BBB to A- Baa2 to A3
$ - Below BBB- Below Baa3
22
Página 47
Calpine Energy Services, L.P.
Threshold I S&P I Moody's
$ 10,000,000 AA- to AAA Aa3 to Aaa
$ 7,500,000 A- to A+ A3 to A1
$ 5,000,000 BBB+ Baa1
$ 3,000,000 BBB- to BBB Baa3 to Baa2
$ - Below BBB- Below Baa3
Exelon Generation Company, LLC
Threshold I Fitch I Moody's
$ 60,000,000 AAA Aaa
$ 50,000,000 A- to AA+ A3 to Aa1
$ 40,000,000 BBB+ Baa1
$ 30,000,000 BBB Baa2
$ 20,000,000 BBB- Baa3
$ - Below BBB- Below Baa3
Conectiv
Threshold I Fitch I Moody's
Unspecified * Above BBB+ Above Baa3
$ - Below BBB- Below Baa3
*Conectiv does not have a defined credit threshold, so for planning purposes, a
$10,000,000 threshold is imposed as a conservative limit
PSEG Energy Resources & Trade, LLC
Threshold I S&P I Moody's
$ 12,000,000 * Fixed Fixed
*Threshold is $12,000,000 as long as Dover maintains a Debt Service Coverage greater
than 1.25% and Total Net Assets of at least $50,000,000 and Total Net Assets do not
decline by more than 25% on a fiscal year end basis.
Morgan Stanley Capital Group
Threshold I S&P I Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA- to AA+ Aa3 to Aa1
$ 15,000,000 A- to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ - BBB- or below Baa3 or below
23
Página 48
Macquarie Energy, LLC
Threshold I Fitch I Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA- to AA+ AA3 to Aa1
$ 15,000,000 A- to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ - BBB- or below Baa3 or below
NextEra Energy Marketing, LLC
Threshold I Fitch I Moody's
$ 23,000,000 AAA Aaa
$ 18,000,000 AA- to AA+ AA3 to Aa1
$ 13,000,000 A- to A+ A3 to A1
$ 8,000,000 BBB+ Baa1
$ 3,000,000 BBB Baa2
$ - BBB- or below Baa3 or below
EDF Trading North America, LLC
Threshold I S&P I Moody's
$ 18,000,000 Fixed Fixed
Deutsche Bank
Threshold I Fitch I Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA- to AA+ AA3 to Aa1
$ 15,000,000 A- to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ - BBB- or below Baa3 or below
Barclays Bank
Threshold I Fitch I Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA- to AA+ AA3 to Aa1
$ 15,000,000 A- to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ - BBB- or below Baa3 or below
24
Página 49
APPENDIX C – Business Risks
Business Risks Topology
Commodity Counterparty Process Volume Budget Regulatory
-
Risk Risk Risk Risk Risk Risk
Market
Receivables Load Market
Price Risk - Deadline CFTC
Risk Uncertainty Uncertainty
Risk
Performance Reporting Load
Volume Risk Supply Risk FERC
Risk Risk Uncertainty
M2M/Forward Generation Forecast
RTO
Curve Risk Uncertainty Error
Liquidity Risk
Basis Risk
25
Página 50
APPENDIX D – Glossary
Back Office – That part of a trading organization which handles transaction accounting,
confirmations, management reporting, and working capital management.
Bilateral Transaction - Any physical or financial transaction between two
counterparties, neither of whom is an Exchange or market entity (e.g. MISO).
Capacity – The real power output rating of a generator or system, typically in
megawatts, measured on an instantaneous basis.
Commodity - A basic good used in commerce that is interchangeable with other
commodities of the same type. Commodities are most often used as inputs in the
production of other goods or services. The quality of a given commodity may differ
slightly, but it is essentially uniform across producers. When they are traded on an
exchange, commodities must also meet specified minimum standards, also known as a
basis grade.
Financial Bilateral Transaction – A Bilateral Transaction that is non-physical and is
defined by a Source Point, Sink Point, and Delivery Point that may be any CP Nodes as
specified by the Midwest ISO.
Financial Forward – An agreement regarding a position in a specified commodity, a
specified price, and a specified future settlement date, that does not result in physical
delivery of the commodity. Rather one party in the agreement makes a payment to the
other party on the basis of the commodity price at the future date.
Front Office – That part of a trading organization which solicits customer business,
services existing customers, executes trades and ensures the physical delivery of
commodities.
Hedging Transaction - A transaction designed to reduce the exposure of a specific
outstanding position or portfolio; “fully hedged” equates to complete elimination of the
targeted risk and “partially hedged” implies a risk reduction of less than 100%.
Mark-to-Market Value – A measure of the current value of unrealized positions;
includes both Open Positions and Closed Positions.
Middle Office – That part of a trading organization that measures and reports on
market risks, develops risk management policies and monitors compliance with those
policies, manages contract administration and credit, and keeps management and the
Board informed on risk management issues.
26
Página 51
Policy – Dover’s Governing Policy for Energy Commodity Risk, as amended and
approved by The Utility Committee.
Portfolio – A collection of transactions.
Realized Gains/(Losses) – The amount earned (or lost) from a transaction, considered
to be realized once the time for performance has lapsed (e.g. delivery of power in the
case of physical transactions or expiration of an option in the case of financial
transactions).
Term – The total duration of a contract, defined as the number of days between the
beginning flow date and ending flow date, inclusive.
Unrealized Gains/ (Losses) – The amount expected to earn (lose) on a specific
transaction(s); however, the time for performance has not lapsed. The total value of
Unrealized Gains/ (Losses) is the Mark-to-Market value.
27
Página 52
APPENDIX E – Swap Transaction Representative
Purpose:
To ensure that the City of Dover, a Special Entity under the Dodd-Frank Financial Reform
Act, selects a qualified representative (“Representative”) to provide advice and guidance
when entering into swap transactions with Swap Dealers or Major Swap Participants.
Definitions:
Special Entity: As defined in 7 U.S.C. 6s(h)(2)(C) and further interpreted in 17 C.F.R.
23.401(c). The City of Dover is a Special Entity as defined by 17 C.F.R. 23.401(c)(2).
Swap Dealer: As defined in 7 U.S.C. 1a(49) and further interpreted in 17 C.F.R. 1.3(ggg)
Major Swap Participant: As defined in 7 U.S.C. 1a(33) and further interpreted in 17 C.F.R.
1.3(hhh)
Representative: As defined in this policy and 17 C.F.R. 23.450
Policy:
Selection: The City of Dover shall endeavor to seek and employ an individual or entity that
will voluntarily act as a Representative for all energy commodity swap transactions
between XXXX and any Swap Dealer or Major Swap Participant. The Representative must
meet the following qualifications identified in 17 C.F.R. 23.450(b):
(i) Has sufficient knowledge to evaluate the transaction and risks;
(ii) Is not subject to a statutory disqualification;
(iii) Is independent of the swap dealer or major swap participant;
(iv) Undertakes a duty to act in the best interests of the Special Entity it represents;
(v) Makes appropriate and timely disclosures to the Special Entity;
(vi) Evaluates, consistent with any guidelines provided by the Special Entity, fair pricing
and the appropriateness of the swap; and
(vii) In the case of a Special Entity as defined in § 23.401(c)(2) or (4), is subject to
restrictions on certain political contributions imposed by the Commission, the
Securities and Exchange Commission, or a self-regulatory organization subject to the
jurisdiction of the Commission or the Securities and Exchange Commission;
provided however, that this paragraph (b)(1)(vii) of this section shall not apply if the
representative is an employee of the Special Entity.
The Representative and the City of Dover shall enter into a legal agreement that binds the
Representative to comply with items (i) through (vii) in this policy.
At no longer than any 12-month interval, the City of Dover shall review the performance of
the Representative to ensure compliance with items (i) through (vii) in this policy.
28