Página 1
COUNCIL COMMITTEE OF THE WHOLE AGENDA
JULY 12, 2016 - 6:00 P.M.
CITY HALL COUNCIL CHAMBERS, 15 LOOCKERMAN PLAZA, DOVER, DELAWARE
PUBLIC COMMENTS ARE WELCOMED ON ANY ITEM AND WILL BE PERMITTED AT APPROPRIATE TIMES. WHEN POSSIBLE, PLEASE NOTIFY
THE CITY CLERK (736-7008 OR E-MAIL AT CITYCLERK@DOVER.DE.US) SHOULD YOU WISH TO BE RECOGNIZED.
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE
AGENDA ADDITIONS/DELETIONS
1. PROPOSED ORDINANCE #2016-18 AMENDING APPENDIX B - ZONING, ARTICLE 3 - DISTRICT
REGULATIONS, SECTION 27 - CORRIDOR OVERLAY ZONE 1 (COZ-1), SUBSECTION 27.66 - BUILDING
HEIGHT (SPONSORS: HARE AND HUTCHISON)
2. REVIEW OF ACTIVE RECREATION AREA PLAN (REQUEST FOR CASH-IN-LIEU) - THE GRANDE,
BUILDING 4: PLANNED NEIGHBORHOOD DESIGN - SENIOR CITIZEN HOUSING OPTION (PLANNING
REFERENCE C-15-04)
(STAFF RECOMMENDS ACCEPTANCE OF THE $22,914 CASH-IN-LIEU OF RECREATION AREA
CONSTRUCTION DONATION, AS THE AMOUNT COMPLIES WITH THE REQUIREMENTS OF THE
ZONING ORDINANCE)
3. ADJOURNMENT OF PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE MEETING
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
(MEETING WILL CONVENE UPON ADJOURNMENT OF THE PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE MEETING)
AGENDA ADDITIONS/DELETIONS
1. WESLEY COLLEGE PROPOSAL FOR FORMER DOVER PUBLIC LIBRARY BUILDING
2. ADJOURNMENT OF LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE MEETING
UTILITY COMMITTEE
(MEETING WILL CONVENE UPON ADJOURNMENT OF THE LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING)
AGENDA ADDITIONS/DELETIONS
1. PRESENTATION - STORMWATER UTILITY
2. ADJOURNMENT OF UTILITY COMMITTEE MEETING
ADJOURNMENT OF COUNCIL COMMITTEE OF THE WHOLE MEETING
/TM
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\COMMITTEE-AGENDAS\2016\07-12-2016 CCW.WPD
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(E)(2), THIS AGENDA IS SUBJECT TO CHANGE TO
INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING.
Página 2
CITY OF DOVER PROPOSED ORDINANCE #2016-18
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL
2 MET:
3 That Appendix B - Zoning, Article 3 - District Regulations, Section 27 - Corridor Overlay Zone 1 (COZ-1),
4 Subsection 27.66 - Building Height of the Dover Code be amended by deleting the text indicated in red
5 strikeout and inserting the bold, blue text, as follows:
6 27.66 Building height.
7 (a) Buildings shall be limited in overall height to 35 feet and shall not exceed two stories. Any
8 building or part thereof located within 100 feet of the right-of-way line of the roadways
9 referenced in Section 27.3 hereof shall not exceed thirty-five (35) feet in height or two (2)
10 stories.
11 ADOPTED: *
12 S:\ORDINANCES\2016\DRAFT\ORDINANCE #2016-18 APDX B-ZONING, ART 3, SEC 27, SUBSEC 27.66-BUILDING HEIGHT\ORDINANCE #2016-18 APDX B-ZONING, ART 3, SEC 27, SUBSEC
13 27.66-BUILDING HEIGHT.wpd
14 SYNOPSIS
15 The proposed amendment revises the building height (development guideline) limitation for
16 a defined area on properties within the Corridor Overlay Zone (COZ-1)
17 (SPONSORS: HARE AND HUTCHISON)
18 Actions History
19 07/12/2016 - Scheduled for Introduction - Council Committee of the Whole/Parks, Recreation, and Community Enhancement
20 Committee
Página 3
City of Dover
DATA SHEET FOR RECREATION PLAN REVIEW
Approval of Cash Donation
PARKS, RECREATION AND COMMUNITY ENHANCEMENT COMMITTEE
MEETING OF July 12, 2016
Plan Title: The Grande, Building 4: Planned Neighborhood Design – Senior
Citizen Housing Option, C-15-04
Plan Type: Active Recreation Area – Approval of Cash Donation
(Cash-in-lieu of Recreation Area Construction)
Associated with Conditional Use Site Plan for PND-SCHO
Property Location: West of Saulsbury Road and on the north side of Forrest Avenue
Property Addresses: 101-405 Doveview Drive
Owner/Applicants: Doveview Investors, LLC
Tax Parcel: ED-05-076.07-01-30.00-000
Present Zoning: RG-5 (General Residence for Mid Rise Apartments Zone)
COZ-1 (Corridor Overlay Zone)
Site Area: 6.7326 ac. +/-
Present Use: 3 Apartment Buildings (Total 144 units)
Proposed Use: Planned Neighborhood Design Senior Citizen Housing Option
4 Apartment Buildings (Total 192 units)
Proposed Cash-in-lieu Donation: $22,914
Project Summary:
The project for The Grande, Building 4 was reviewed as a Conditional Use Site Plan to establish
a Planned Neighborhood Design development of Senior Citizen Housing. The plan proposes
construction of a four story 62,240 SF apartment building consisting of 48 units (Building 4) and
other associated site improvements to join the existing apartment complex which consists of
three apartment buildings now known as The Grande (previously developed under Site Plan S-
11-12 Dove View). With this project for a fourth building, the complex will consist of a total of
192 apartment units of Senior Citizen Housing.
Active Recreation Area Plan Summary:
As part of the Plan review process for this project, the applicant prepared a Conceptual
Recreation Plan which illustrates how The Grande: Building 4 development will provide
recreation amenities in accordance with the design specifications described in Article 3 § 24.61
Common Open Space and Article 5, Section 10 Open space, recreation, and other public
facilities of the Zoning Ordinance.
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Página 4
C-15-04 The Grande, Building 4 Planned Neighborhood Design – Senior Citizen Housing Option: Active
Recreation Area – Approval of Cash Donation
Report to Parks, Recreation & Community Enhancement Committee –July 12, 2016
Page 2 of 3
Due to the property size and unit density, The Grande PND-SCHO project qualifies for Active
Recreation Area exemption for small developments under Zoning Ordinance, Article 5 §10.514.
The Active Recreation Area for this project is required at a rate of 150 square feet per dwelling
unit or 10,000 SF whichever is greater. Based on a total of 192 dwelling units, 28,800 SF of active
recreation area is required. The Plan indicates that 22,569 S.F. of land would be reserved as Active
Recreation Area including the amenities of walking paths, horseshoe pits, shuffleboard, swing set,
benches, and picnic tables. The deficiency of 6,231 SF of active recreation area for the project
was proposed to be satisfied by a cash-in-lieu donation.
The Parks, Recreation and Community Enhancement Committee reviewed the Active Recreation
Area for The Grande, Building 4: Planned Neighborhood Design – Senior Citizen Housing
Option at their meeting on December 14, 2015. The developer’s proposal received a favorable
recommendation from the Parks, Recreation & Community Enhancement Committee, and the
Active Recreation Plan was conditionally approved by the Planning Commission following a
public hearing on December 16, 2015 as part of the Conditional Use Site Plan. As part of the
approval of Active Recreation Area Plan for the project, the Planning Commission accepted the
applicant’s proposal for a cash-in-lieu payment for the deficiency of active recreation area not
constructed.
CODE SUMMARY AND ANALYSIS:
Article 5, Section 10 of the Zoning Ordinance addresses Open Space, Recreation and Other
Public Facilities. This includes in subsection 10.5 where exemptions for small developments are
outlined with reference to the process and calculation of the amount for cash-in-lieu of recreation
area construction. Subsection 10.7 further specifies that City Council, through the Parks,
Recreation and Community Enhancement Committee, must approve the cash donation amount
prior to final acceptance by the Planning Commission.
Regarding the calculation of the amount of the cash donation, the Zoning Ordinance specifies
that the “cash donation shall be equivalent to the appraised value of land required…” and that
this value shall be “based on the appraisal prepared for the developer to secure construction
financing.”
An appraisal performed by WR McCain & Associates., dated September 4, 2014, was submitted
to the Planning Office. This appraisal identifies a land value per unit which was utilized to
generate a land value per acre. Based on the value of the 6,231 SF of land required to satisfy the
Active Recreation Area requirement, the cash-in-lieu amount was determined. See calculation
below:
2014 Appraisal of Land Value: 144 units @ $7500 per unit = $1,080,000
The Grande property consists of 6.74 acres of land
Land Value per acre = $160,237 per acre
Active Recreation Area Deficiency = 6,231 SF = 0.143 acre
Cash-in-Lieu Amount = $160,237 per acre value x 0.143 acre = $22,914
Página 5
C-15-04 The Grande, Building 4 Planned Neighborhood Design – Senior Citizen Housing Option: Active
Recreation Area – Approval of Cash Donation
Report to Parks, Recreation & Community Enhancement Committee –July 12, 2016
Page 3 of 3
CODE CITATIONS:
Dover Code of Ordinances, Appendix B – Zoning, Article 5 – Supplementary Regulations,
Section 10 – Open Space, Recreation and Other Public Facilities:
Article 5 Section 10
10.1 Recreation Areas.
10.17 Cash in lieu of recreation area construction.
10.171 Determination of suitability for cash donation. If the commission determines that
the construction of recreation is not practical due to close proximity to existing available
recreation facilities or infeasible due to natural characteristics of the land or will not
benefit the residents of the development, the commission shall require a full or partial
cash in lieu of areas of donation to be made by the developer in lieu of a full or partial
dedication of land.
10.172 Separate recreation account. The cash donation shall be deposited in a
separate account to be used for parks, playgrounds or recreational purposes.
10.173 Amount of cash donation. The cash donation shall be equivalent to the
appraised value of land area required in section 10.16. The land area value shall be
based on the appraisal prepared for the developer to secure construction financing. This
submitted appraisal shall be a copy of the original supplied to the lending institution, with
that institution identified, and shall conform in all ways to the Uniform Standards of
Professional Appraisal practice and be performed by an appropriately qualified certified
appraiser. If an appraisal prepared for construction financing is not available, then the
developer shall have an appraisal done in accordance with the procedures set forth in
[sub]section 10.174.
10.174 Appeal of appraised value. If the city does not accept the land value established
by the appraisal detailed in [sub]section 10.173, the city may, at the developer's expense,
require another appraisal be performed. This appraisal will be let on a bid basis between
at least three appropriately qualified, certified appraisers selected by the city. The
appraiser(s) who prepared the original appraisal in [sub]section 10.173 cannot be a party
to this appeal appraisal.
10.175 Payment of cash donation. One hundred percent cash donation provided under
this section shall be collected prior to issuing the first building permit for the development.
10.5 Exemption to recreation area and open space dedication.
10.51 Exemptions for small developments.
10.514 Residential developments of ten (10) or fewer acres with a density over six units per
acre. These developments shall be exempt from the area requirements set forth in section
10.16, but shall be required to provide 150 square feet of active recreation area per dwelling
unit or 10,000 square feet of active recreation area, whichever is greater. If the commission
determines that the construction of some or all of the required active recreation area is not
practical or desirable, the commission shall require a cash in lieu donation for the active
recreation area determined as not practical or desirable. Cash-in-lieu amount shall be in
accordance with subsection 10.173 of this article.
10.7 Council approval. Prior to acceptance by the planning commission, all areas planned for public
dedication, or cash donations provided under this section must be submitted to, and approved by the
parks, recreation, and community enhancement committee of the City of Dover, and shall be subject to
final review and approval by [the] city council.
STAFF RECOMMENDATION
Staff recommends acceptance of the $22,914 cash-in-lieu of recreation area construction
donation, as the amount complies with the requirements of the Zoning Ordinance.
Página 6
Wesley College Summer 2016
Proposal
Wesley College proposes that in exchange for the conveyance of
the former Dover Public Library located on South State Street, the
College will convert the building into a state-of-the-art education- Offering
al facility dedicated to the teaching and training in health science
and other high-demand fields of study that would serve the City of health
Dover and the surrounding area.
science and
In addition to building and strengthening the partnership between
the City of Dover and Wesley College, the transfer of ownership of other high
the former Dover Public Library will relieve the city of associated
costs of the building and ensure that an unutilized building with demand
limited parking is now put to productive use.
fields of
Uniquely, and most importantly, the transfer and partnership will
bring new life to Downtown Dover with the influx of students, study
faculty, and families who will utilize the facility seven days a
week, morning and evening.
View from State Street
Página 7
Projected Costs Consistent With the
The College is estimating the total projected cost of renovation and ret-
Objectives Of the
rofit for this building will be in excess of $2 million. Downtown Develop-
This cost estimate is based upon the report commissioned by Wesley ment District
College from Becker
Morgan and Allen and The awarding of the
Shariff Engineering. former Dover Public
Their findings indicate
the former Dover Pub-
Library to Wesley Col-
lic Library will require lege, to offer education
substantial upgrades in health sciences and
to building systems,
fire suppression and other high demand
Americans with Disa- fields of study, is com-
bilities Act to be pletely consistent with
brought up to current
building codes, and to the objectives of the
meet basic expecta- General Assembly’s
tions of a modern Downtown Develop-
work environment.
This baseline cost for ment Districts Act.
systems upgrades The stated objectives
alone is estimated to are:
cost $310,000 for me-
chanical systems,
Spur private capital
$142,000 for the elec-
trical system, and investment in com-
$163,000 for plumb- mercial business dis-
ing. In addition to the
aforementioned tricts and other
$615,000, fire sup- neighborhoods;
pression and ADA requirements will easily add an additional $300,000
- $400,000 to the baseline renovation, resulting in approximately $1 Stimulate job growth
million simply to bring the facility to code. and improve the
An additional $1 million will be required for the required renovation commercial vitality of
and retrofit of the building for the specific desired educational purpos- our cities and towns;
es, such as classrooms, labs etc. This amount is an estimate based upon
renovation costs per square foot of the former Frear Federal Building on
Help build a stable
New Street (now known as Johnston Hall). The College acquired this
facility from the United States Government in 2012 and consequently community of long-
renovated and retrofitted for similar use. term residents in our
downtowns and other
neighborhoods.
Respectfully, this pro-
ject accomplishes all
three objectives.
Page 2
Página 8
Economic Impact
A recently completed economic impact analysis for Wesley College demon- Ownership Vs.
strated in vivid terms the positive economic influence Wesley has on the Leasing
local area, state and region. According to the analysis, Wesley College con-
tributes approximately $86,000,000 to the economy of Kent County.
While a specific number for Dover was not provided, it is certainly defensi-
Wesley College is pre-
ble that the vast majority of this amount is realized in the City of Dover as
the College sits in the very heart of the city. The stability and continuing pared to raise the
growth of Wesley College directly necessary funding to
impacts the economic, intellectual, renovate the former
social and cultural vitality of the Dover Library.
residents of the City of Dover. In
recent years Wesley has consoli- As already mentioned,
dated its educational offerings
we have a proven
from both Kent and New Castle
counties to the Dover campus and track record of suc-
Dover Air Force Base, resisting cess.
overtures to locate satellite services
elsewhere. However, we would
not be eligible for sig-
The acquisition and re-purposing
nificant revenue
of the former Dover Public Library
Master’s of Occupational Therapy class would produce economic activity streams upon which
and new jobs within the city. Signif- we would depend for
icant numbers of students, faculty, and visiting families of prospective stu- this renovation if the
dents would be moving each day from the main campus to the former Do- College did not own
ver Library site, as well as Johnston Hall. This foot traffic through the
downtown, particularly the Loockerman Street corridor, will have signifi-
the facility outright.
cant impact on the local businesses and hence the economy, both short and
Partners, including
long term. The number of students annually utilizing the new facility
would be estimated to be in excess of 500. While impossible to put a num- foundations and fed-
ber on this economic activity, it is obvious that it would be significant. eral or state grants,
require that the
In addition to the long-term and sustained economic benefit to the City,
short-term economic benefit will be realized as renovation and upgrades building in which
are initiated. As plans for the facility are formulated, preliminary estimates their dollars are in-
call for 5 to 7 initial permanent jobs, with additional ones to follow. Salary vested be owned by
and benefits for these new positions would be estimated at $250,000 to the College. Private
$350,000. Also, construction jobs and other ancillary positions will benefit
from renovation that will take several months to complete.
donors also would be
less likely to invest
Wesley College is committed to being an integral partner to the continuing significant dollars in a
revitalization of downtown Dover. As the College continues to grow, the
increasing integration of the Wesley campus and the downtown area is a
leased facility.
part of the strategic direction envisioned by the College leadership. Wesley
believes that an ever increasing vitality for the city benefits the College, and
a strong and growing Wesley benefits Dover.
Page 3
Página 9
History of Public/Private Partnerships
Wesley College has enjoyed an excellent working In 2012 the General Services Administration
relationship with both the City of Dover, the Levy (GSA) of the United States Government trans-
Court, the governor, and state legislators. Coopera- ferred ownership of the former Allen Frear Fed-
tion between the college and government entities in eral Building on New Street to Wesley College.
two significant public/private partnerships over the The GSA declared the building as surplus in or-
past few years has greatly benefited both Wesley der to avoid the costs of modernization. The
College and the community. acquisition of this building was the culmination
of nearly three years of effort by Wesley to make
In 2011 Wesley completed the North and South Pla- a strong case for the relocation of our acclaimed
zas on the campus. This streetscape project convert- nursing program to that facility conveniently
ed public through streets into pedestrian walkways, located between the campus and Bayhealth.
buried utility lines, erected lighting for safety and Significant support from the Mayor and City
aesthetics, converted a playground into a parking Council of Dover, coupled with the united voic-
lot, and created new greenspaces. The transfor- es of the Levy Court, Kent County legislators, the
mation to the campus was significant. None of this Governor, both of Delaware’s U.S. Senators and
would have been possible without the full support of House Member, as well as Bayhealth, convinced
the Dover City Council who deeded the streets to the the GSA that Wesley was the logical recipient.
College. Dover also worked with Wesley to be the The College spent approximately $3,500,000 to
municipal sponsor of Community Transportation repurpose the facility into a state-of-the art
Funds which created the public parking lot on the health sciences building. Wesley was successful
campus. A $1,580,000 grant from the Delaware in fundraising these dollars from individual do-
Infrastructure Fund, coupled with private fundrais- nors, foundations, corporations, and a state ap-
ing from the College, produced a transformative propriation. Today, the building which is now
$3,000,000 initiative that has enhanced the campus
known as Johnston Hall, is a busy and bustling
and the community. location for students, faculty and staff.
(continued on page 5)
Page 4
Página 10
History of Public/Private Partnerships continued from page 4
Master’s of Occupa-
Wesley College has an established record of success in pub- tional Therapy
lic/private partnerships. The College has proven itself to be
a good steward of the resources given and to follow through Demand
on promises made.
The Carriage House that sits adjacent to the former Dover In Delaware there are on-
Library is a separate facility that Wesley would be pleased to ly two Certified Occupa-
have Dover consider as the location for a Dover Museum in tional Therapy Programs
honor of the city’s pending 300th birthday celebration. As a
central part of Dover’s history since the College’s founding Starting Fall 2016 the on-
in 1873, Wesley College would welcome a partnership with ly graduate program in
the City of Dover for a joint venture to share the city’s rich Delaware will be Wesley’s
history and celebrate its future. Wesley faculty and students Master’s of Occupational
offer a significant source of human capital to enhance this
project. Therapy program
Nearest institutions locat-
ed in Philadelphia, PA
Only nine graduate pro-
grams within 100 mile
radius
230 Occupational Thera-
pists employed in Dela-
ware (Bureau of Labor
Statistics)
Over 185 job vacancies in
Delaware (Indeed.com)
Top 10 Best Careers
(Time)
These are among the 5
Johnston Hall (former Frear Building) Most In-Demand Jobs
Right Now (TIME, January
2014)
Former Allen Frear Federal Building decommissioned
and awarded to Wesley College in November 2012
Projected Growth
$3 million dollars in gifts and grants utilized to refur-
bish building 29% Nationally
Opened to students in January 2014 23.9% for Delaware
(Bureau of Labor Statis-
Named in honor of Dr. and Mrs. William Johnston in tics, 2014)
May 2015
Page 5
Página 11
Summary HIGHLIGHTS
The re-purposing of The 50-acre main
the former Dover Li-
brary is a great op-
campus features a
portunity to make a library, 19 buildings,
positive impact on recreational facilities
the future of our plus a location at
community and re- DAFB
gion. Wesley College
has been approached First Master’s of Occu-
by other municipali- pational Therapy
ties to open similar program in Dela-
satellites, but has re-
mained committed to ware (Fall 2016)
Dover and the trans-
formation that col- 1,600 students attend
lectively can be real- Wesley from 30
ized for our commu- states (46% from
nity and our future. Delaware) and 18
Wesley will assume countries
the liability of this
property, which is costing Dover to maintain, needs significant The student to faculty
capital investment for modernization, offers little parking for ratio is 17 -1
commercial ventures, and has been under utilized since the re-
location of the library to Loockerman Street. The College in- Over 35 areas of study
tends this facility to be used only for educational purposes.
Wesley would be pleased to negotiate a right of first refusal to
in arts and sciences,
the City of Dover should the building ever cease to be used for business, health sci-
this purpose and put on the market for sale. ences, education,
and fine arts includ-
Most importantly, Wesley College will ensure the revitalization ing graduate pro-
of a building that will be renovated and put to a useful purpose, grams
namely the training of young professionals including, but not
limited to, occupational therapists, who are in very high de- NCAA Division III level
mand in Delaware. New jobs will be created, foot traffic into athletics in 18 sports,
the downtown will be increased, and an unused building will be
re-purposed. Both Wesley College and the City of Dover are the several of which, in-
long-term beneficiaries from this proposal. cluding football,
consistently rank
For more information about this proposal please contact Wesley among the top pro-
College President Robert E. Clark II at 302-736-2508. grams in the country
College Raptor Inc.
named Wesley the
top “Hidden Gem”
institution in the
state of Delaware
Página 12
City of Dover
Stormwater Utility Feasibility Study
Council Committee of the Whole
Slide 1
Página 13
This Evening’s Presentation
Answer the Following Questions:
What is a stormwater utility?
Where are they being used?
Why is the City considering one?
What steps have been taken so far?
Describe the Existing Situation
Enterprise funds and rate determinations
Property characteristics
Levels of service
Provide Potential Stormwater Utility Structure
Preliminary rates and credits
Assumptions
Fee examples
Slide 2
Página 14
Rain is natural….
Slide 3
Página 15
Stormwater is manmade….
Slide 4
Página 16
Unmanaged Stormwater
Overtaxes built drainage infrastructure
Causes drainage problems and flooding
Damages public and private property
Erodes streambanks and pollutes waterways
Increases water treatment costs
Slide 5
Página 17
A Stormwater Utility Fund Is…
Stable – Funding does not fluctuate year to year based
on prior years’ occurrences.
Adequate – Determined by actual expenditures plus
projected future needs.
Flexible – Rates can be adjusted as conditions warrant.
Equitable – Cost is borne by the user based on demand
placed on the drainage system.
Utilities were recommended by Governor
Minner’s Task Force in 2006 as funding vehicle
for a comprehensive approach to drainage.
Slide 6
Página 18
Where Are Stormwater Utilities
Being Used?
Nearly 1,500 exist in U.S. and Canada
Forty states have at least one
Six states have 100 or more
Average and mean populations – 73,900 and 19,200
Source: 2014 Stormwater Utility Survey – Western Kentucky University
Slide 7
Página 19
Where Are Stormwater Utilities
Being Used?
Stormwater utility activities in Delaware
Wilmington and Lewes BPW in place (2006 and 2010)
Newark currently investigating
New Castle County initiated but did not complete
Slide 8
Página 20
Why Is the City Considering a
Stormwater Utility?
Address increasing NPDES compliance costs
City needs a compliance-based utility
Provide resources for under-funded programs
Downtown development / watershed-level evaluations
Capital program / system optimization
Comprehensive O&M program / proactive approach
Decrease reliance on General Fund appropriations
No longer adequate to support programs
Results in competing with dissimilar services
Equitable approach fairer to all
Slide 9
Página 21
Why Is the City Considering a
Stormwater Utility
Recommendation 6 from Part III – Plan Goals: Utilities
from 2008 Comprehensive Plan
“Determine the Feasibility of Implementing a
Stormwater Utility within the City of Dover”
Nutrient Reducing Recommendation 9 – Stormwater
Utility from St. Jones River Pollution Control Strategy
“A stormwater utility should be implemented to
generate a stable source of funding for stormwater
management within the watershed”
Slide 10
Página 22
What Steps Have Been Taken to
Date?
Obtained Grant from DNREC to Offset ½ of Study Costs
Assessed City Programs and Expenditures
Evaluated Property and System Mapping
Developed Spreadsheet Model
Calculation of potential rates
Evaluation of various credit opportunities
Sensitivity analysis of options
Slide 11
Página 23
What Steps Have Been Taken to
Date?
Public outreach
Citizen survey (continuous since August 12, 2015)
Fact sheets (placed on website August 6, 2015)
Stormwater 101 presentation (placed on website August 6, 2015)
Improved website information based on recommendations
Slide 12
Página 24
Enterprise Funds and Rates
Water and Wastewater Fund
Meter flows and divide total into costs to establish rates
Assess resulting fees on thousand gallon basis
Electric Fund
Meter usage and divide total into costs to establish rates
Assess resulting fees on per kilowatt basis
Stormwater Fund
Cannot meter – need different approach
Assess fees on surrogate basis
Slide 13
Página 25
Stormwater Utility Rates
Primary Foundation
Direct correlation exists between imperviousness and impact
Must Be Equitable
Property owners’ fee proportional to impact on system
Not Administratively Burdensome
Time consuming to determine impact for every lot
Use tiers for single-family lots (80% of total parcels in Dover)
Use square footage for others (83% of total impervious area
in Dover)
Slide 14
Página 26
Stormwater Utility Rates
= 1 ERU
(Equivalent Runoff Unit)
2,200 square feet in Dover
Residential
= 40 ERUs (less credit)
Commercial
Slide 15
Página 27
Existing Property Characteristics
Single-family Lots
Tier 1
RG-1, RG-2, RG-3, and RM-1 zoning districts
Average imperviousness = 2,164 square feet
Rounded to 2,200 square feet = 1.0 ERU
Tier 2
RM-2, R-7, and R-8 zoning districts
Average imperviousness = 3,060 square feet or 1.4 ERUs
Tier 3
R-10, R-15, and R-20 zoning districts
Average imperviousness = 4,850 square feet or 2.2 ERUs
Slide 16
Página 28
Existing Property Characteristics
All Lots
Commercial 36,385,000 ft2 or 25%
Dover Air Force Base 34,611,000 ft2 or 23%
Office / Institutional 23,855,000 ft2 or 16%
Single-family residential lots 23,844,000 ft2 or 16%
Industrial / Manufacturing 13,971,000 ft2 or 9%
Multi-family and other R Districts 10,783,000 ft2 or 7%
Mobile Home Parks 2,803,000 ft2 or 2%
Agricultural / Open Space 2,204,000 ft2 or 2%
Slide 17
Página 29
Existing Property Characteristics
Tax-Exempt Parcels
Dover AFB 34,611,000 sq. ft.
State-owned 6,711,000 sq. ft.
College / University 4,966,000 sq. ft.
Primary or Secondary Education 3,268,000 sq. ft.
City-owned 3,045,000 sq. ft.
Miscellaneous / Unknown 2,727,000 sq. ft.
Religious Organization 2,359,000 sq. ft.
Dover Housing Authority 768,000 sq. ft.
Federally-owned 521,000 sq. ft.
County-owned 475,000 sq. ft.
Health Care Facilities 261,000 sq. ft.
Private / HOAs 228,000 sq. ft.
Slide 18
Página 30
Levels of Service
Existing Services
27 employees with varying percentages of dedicated time
Public Works (Streets Division / GIS / Engineering / Administration)
Planning and Inspections
53 vehicles or pieces of equipment
About $375,000 in value
Over $1 million on capital projects per year
Tar Ditch project major undertaking
Slide 19
Página 31
Levels of Service
Existing Asset Information
INFRASTRUCTURE QTY ACTIVITY (2015) QTY
Inspected .79 mi
Stormwater Pipe 90 mi
Cleaned .62 mi
Repaired 19
Stormwater Structures 5,842
Cleaned 496
Stormwater Outfalls 653 Inspected 33
Stormwater Open Channels 9.3 mi Cleaned 1.2 mi
Stormwater Management
19 Rehabilitated 6
Facilities
Stormwater Management
19 Maintained* 14
Facilities
* - Stormwater Management Facilities which are maintained by City staff.
Slide 20
Página 32
Levels of Service
“Compliance” Services
PERMIT REQUIREMENTS EXISTING (2015) COMPLIANCE 2016 - 2020
City-wide Storm System Asset Not required 20% per year of stormwater structures
Management and Inspection
Public Outreach Website, Flyers Pre- and Post-Surveys and education
campaign; website enhancements
Employee Training 1 Training/Year Multiple training sessions; specialized
training based on job class; enhanced
record keeping
Wet Weather Monitoring 2 Industrial Sites (semi- 2 Industrial Sites and 5 Outfalls (semi-
annual) annually)
Stormwater Management Not required New for 2016 - 2020
Performance Monitoring Plan
Outfall Monitoring 5% of Infrastructure 20% of Infrastructure
Construction of Stormwater Not required Reduce pollutants (nitrogen,
Management Facilities to address phosphorus, bacteria) per permit
pollutants
Slide 21
Página 33
Levels of Service
“Optimum” Services
Maintenance of Privately-owned SWM Basins
Residential only / in conjunction with credits program
Relieve lay people from responsibility
Better assure water quantity and quality control
Slide 22
Página 34
Levels of Service
“Optimum” Services
Future Capital Projects
Additional Street, Concrete & Alley Program
City Hall/Dover Library Conveyance System
Drainage Ditch System- Fox Hall, Puncheon Run,
White Oak Road
Water Street, Reed Street, and State Street Flooding
The Greens of Dover / Lamplighter Lane
Police Station Basin Retrofit
Persimmon Park Place
Lynnhaven Drive
Slide 23
Página 35
Preliminary Rates and Credits
Existing Program $2.75 / ERU / month
Compliance Level of Service $3.25 / ERU / month
Optimum Level of Service $8.50 / ERU / month
Paying into HOA with SWM Facility 33% Credit
On-site SWM Facility (Non-residential) 33% Credit
Pollution Prevention Plan (Non-residential) 25% Credit
Others to be determined (not included in calculations)
Slide 24
Página 36
Variables That Affect Rates
Exemptions None other than Dover AFB
Impervious cover cap 2,000,000 sq. ft. assumed
Inflation / escalation rates 2% assumed
Allowances for mapping discrepancies
“Filters” for single-family uses in multi-family zones
Slide 25
Página 37
Fee Examples
Layout Legend
ERU base rate Compliance Level Rate
ERU tier rate Compliance Level Rate (based on Tier Group 1, 2, or 3)
ERUs Equivalent Residential Units for Commercial, Office, and
Industrial Examples
Credit 1 Paying into HOA with SWM Facility (33%)
Credit 2 Non Residential On-site SWM Facility (33%)
Credit 3 Non Residential Pollution Prevention Plan (25%)
Final fee* $2.75 / month Existing Level of Service Fee
$3.25 / month Compliance Level of Service Fee
$8.50 / month Optimum Level of Service Fee
* - To reference the costs breakdown, see slide 24
Slide 26
Página 38
Fee Examples
Single-Family Residential Lot
Tier 1
ERU factor 1.0
ERU base rate $2.75 / month
$3.25 / month
$8.50 / month
ERU tier rate $2.75 / month
$3.25 / month
$8.50 / month
Credit 1 $0.92 / month*
$1.08 / month*
$2.83 / month*
Final fee $1.84 / month
$2.17 / month
$5.67 / month
* If paying into HOA with SWM basin
Slide 27
Página 39
Fee Examples
Single Family Residential Lot
Tier 2
ERU factor 1.4
ERU base rate $2.75 / month
$3.25 / month
$8.50 / month
ERU tier rate $3.85 / month
$4.55 / month
$11.90 / month
Credit 1 $1.28 / month*
$1.52 / month*
$3.96 / month*
Final fee $2.57 / month
$3.03 / month
$7.93 / month
* If paying into HOA with SWM basin
Slide 28
Página 40
Fee Examples
Single Family Residential Lot
Tier 3
ERU factor 2.2
ERU base rate $2.75 / month
$3.25 / month
$8.50 / month
ERU tier rate $6.05 / month
$7.15 / month
$18.70 / month
Credit 1 $2.02 / month*
$2.38 / month*
$6.23 / month*
Final fee $4.03 / month
$4.77 / month
$12.47 / month
* If paying into HOA with SWM basin
Slide 29
Página 41
Fee Examples
Commercial
ERUs 1,419
ERU rate $2.75 / month
$3.25 / month
$8.50 / month
Subtotal $3,902 / month
$4,612 / month
$12,062 / month
Credit $1,301 / month**
$1,537 / month**
$4,020 / month**
Imp. area 6,668,869 ft2 * Final fee $2,601 / month
$3,075 / month
Capped imp area 3,122,510 ft2 *
$8,042 / month
ERU size 2,200 ft2
* Two parcels ** Maintaining SWM basin
Slide 30
Página 42
Fee Examples
Office/Institutional
ERUs 47
ERU rate $2.75 / month
$3.25 / month
$8.50 / month
Subtotal $129.25 / month
$152.75 / month
$399.50 / month
Credit $0.00 / month
$0.00 / month
$0.00 / month
Imp. area 103,942 ft2 Final fee $129.25 / month
$152.75 / month
ERU size 2,200 ft2
$399.50 / month
Slide 31
Página 43
Fee Examples
Office/Institutional
ERUs 329
ERU rate $2.75 / month
$3.25 / month
$8.50 / month
Subtotal $905 / month
$1,069 / month
$2,797 / month
Credit $302 / month
$356 / month
$932 / month
Imp. area 722,972 ft2 Final fee $603 / month
$713 / month
ERU size 2,200 ft2
$1,865 / month
* Maintaining SWM basin
Slide 32
Página 44
Fee Examples
Office/Institutional
ERUs 53
ERU rate $2.75 / month
$3.25 / month
$8.50 / month
Subtotal $145.75 / month
$172.25 / month
$450.50 / month
Credit $0.00 / month
$0.00 / month
$0.00 / month
Imp. area 116,525 ft2 Final fee $145.75 / month
$172.25 / month
ERU size 2,200 ft2
$450.50 / month
Slide 33
Página 45
Fee Examples
Industrial/Manufacturing
ERUs 576
ERU rate $2.75 / month
$3.25 / month
$8.50 / month
Subtotal $1,584 / month
$1,872 / month
$4,896 / month
Credit $528 / month*
$624 / month*
$1,632 / month*
Imp. area 1,267,590 ft2 Final fee $1,056 / month
$1,248 / month
ERU size 2,200 ft2
$3,264 / month
* Maintaining SWM basin
Slide 34
Página 46
Thank You!
Slide 35
Página 47
Contact Information
David Athey
URS Corporation / AECOM
302-781-5900
david.athey@aecom.com
Jason Lyon
Dover Department of Public Works
302-736-7025
jlyon@dover.de.us
Slide 36