Este texto se extrajo de el PDF de forma automática y puede contener errores. El PDF es el registro oficial, así que consúltelo antes de confiar en esto.
Página 1
COUNCIL COMMITTEE OF THE WHOLE
The Council Committee of the Whole Meeting was held on April 12, 2016, at 6:00 p.m.,
with Council President Slavin presiding. Members of Council present were Mr. Anderson,
Mr. Sudler (arrived at 6:01 p.m., departed at 7:13 p.m., and returned at 7:22 p.m.), Mr. Neil, Mr. Lewis (arrived
at 6:04 p.m.), Mr. Cole, Mr. Hosfelt, Mr. Hare, and Mr. Hutchison. Mayor Christiansen was also
present (departed at 7:10 p.m. and returned at 7:26 p.m.) Civilian committee members present were
Mr. Keller and Mr. Shelton (Safety Advisory and Transportation), Mr. Caldwell and Mrs. Horsey
(Parks, Recreation, and Community Enhancement), Mr. Blakeman and Ms. Stewart (Utility), and
Mr. Shevock and Ms. Maucher (Legislative, Finance, and Administration).
AGENDA ADDITIONS/DELETIONS
Mr. Hutchison moved for approval of the agenda, seconded by Mr. Neil and unanimously
carried.
Review of FY 2017 Preliminary Budget and Capital Investment Plan (CIP)
Council President Slavin advised those present that this two (2) hour meeting would likely lead to
up to 15 or more hours of budget hearings between now and the end of May. He indicated that
consideration of the FY 2017 budget would take place a little earlier in the budget season and extend
a little later in the year than usual because the City would wait to see what occurs with some of the
State’s issues before adopting the final budget. Mr. Slavin reminded members that last year’s budget
was very challenging and the FY 17 budget, although perhaps not as daunting, would be challenging
nonetheless.
Mr. Scott Koenig, City Manager, concurred that last year had been a very difficult budget year and
that Council had been asked to do some heavy lifting and approve a large property tax increase of
approximately 19.9 %. Council had directed Staff not to come back for a tax increase for FY 17 and
to look at mid-year fee adjustments for rental and other permits that had not been adjusted in recent
years. Mr. Koenig stated that the Electric Fund budget was the least difficult of the City’s three (3)
funds to balance and was seeing a downward trend in power costs over the long term. With respect
to the Electric Fund, the City was getting up to authorized staffing levels and delivering on capital
and operational projects. Mr. Koenig explained that the five (5) year forecast for the
Water/Wastewater Fund was a little more challenging. Staff proposed to keep rates the same in the
budget for this fund. Mr. Koenig advised that there had been discussion regarding an inclining
block, which was on the radar screen for water and sewer rates, but staff did not believe that this
would have to be enacted in the FY 17 budget. Mr. Koenig indicated that the General Fund budget
had the most pressure and concerns, with a gap in policy compliance of a little more than $1M. He
stated that ways to close this gap would be discussed in the coming months prior to the budget
discussions.
Mr. Koenig reviewed a memorandum regarding FY 2016/2017 Preliminary Budget & Capital
lnvestments Plans (5 Years), dated April 6, 2016. He advised that there had been a fair rebound of
real estate property transfer taxes and that staff was keeping an eye on State revenues. Mr. Koenig
reminded members that, when the budget year began, Staff had been asked to have an alternate plan
to reflect the potential for no State revenue transfers; however, current indicators from the Delaware
Department of Transportation (DelDOT) budget reflected that Municipal Street Aid and Community
Página 2
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 2
Transportation Funds (CTF) would be funded at the current level. Additionally, discussions related
to Payment in Lieu of Taxes (PILOT) in draft bills indicated that PILOT may be more favorable to
the City in FY 17, partly due to changes in the allocation formula with existing funds. He advised
that proposed changes to State law regarding PILOT would add provisions for cities with a minimum
population of 25,000, and add funding to the total pot available, which would indicate that the City
may receive additional PILOT funds; however, this was yet to be seen. Mr. Koenig noted that the
State had increased the City’s health insurance premiums by 7.7% and that the workforce shares this
cost, with some employees sharing at an 85/15 rate and newer employees at 80/20. He expressed
his belief that health care costs had increased by approximately 21%, compared to 15% last year.
Mr. Koenig explained that there was an increase of 16.5% in payroll in the General Fund and 3.4%
in the Water/Wastewater Fund related to the Civilian Pension Fund, but a 31.1% decrease in this
expense in the Electric Fund based on biennial actuarial calculations. Percentages for Other
Post-Employment Benefits (OPEB), which had been a concern, decreased across all funds, as
follows: General Fund, 2.2%; Water/Wastewater, 4.6%; and Electric, 5.4%.
Mr. Koenig informed members that new debt service was proposed for a couple of projects in the
General Fund, one (1) of which was the replacement of the City’s Enterprise Resource Planning
System in hopes of fully integrating finances across the City, including the Police Department and
other satellite locations. This would allow for a true electronic dashboard reflecting all revenue and
expense classifications across the City, including grant management and other types of revenue that
are currently not easily accounted for. Mr. Koenig indicated that abandonment of the old PW2
Site/Tar Ditch was also proposed for debt service funding. This stormwater improvement would
alleviate flooding at the Water Street/Governors Avenue intersection across from Bayhealth Medical
Center down to old PW2, at an estimated cost of $7.6M for construction. He stated that Staff would
seek to use City funds and also to partner with the State and other interested entities for construction.
Mr. Koenig noted that there would also be debt service related to water/wastewater projects using
the State revolving fund. Several water/wastewater projects would be bundled together to fund
construction of new pump stations and similar projects over approximately a three (3) year period,
as well as expansion of the water treatment plant.
In reviewing Financial Policy Compliance, Mr. Koenig noted that there was a gap in the General
Fund of approximately $1.2M. The Water/Wastewater and Electric Funds were both positive in
terms of compliance; however, the five (5) year projection for the Water/Wastewater Fund indicated
that additional funding through rates may be required.
Referring to the FY 2017 Preliminary Annual Operating Budget - Dover Delaware - General Fund
Cash Receipt Summary, Mr. Koenig indicated that a beginning of the year adjustment would be
made to the beginning balance after Mrs. Donna Mitchell, Controller/Treasurer, receives audit
results. The projected beginning balance in the General Fund for FY 17 was approximately $4.45M,
which was approximately 11.9% above the FY 16 numbers. Mr. Koenig informed members that
some revenues were slightly increased. He expressed concern about Kent County book
reimbursement, which reflected a decrease of approximately $50,000; however, he explained that
those numbers were balancing out by other revenues coming from business licenses, permits, etc.
Página 3
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 3
Mr. Koenig stated that property tax revenues were estimated at $12.932M, noting that staff had
added tax ratables to the profiles for this year. He advised that recreation revenue was projected to
increase slightly and franchise fees were projected to be flat. No sanitation rate changes were
projected at this point and sanitation fees were trending slightly lower, with a reduction of
approximately $42,000. Mr. Koenig indicated that court fees and investment income were increasing
slightly. He stated that there was not much change in interfund receipts and transfers. Mr. Koenig
explained that although there was a slight change in police-related extra duty, this is a pass through
number and when expenses are considered, there would be an overall cost reduction.
With respect to transfer tax, Mr. Koenig stated that this revenue was trending up. The initial FY 16
budget projected transfer taxes at $1.34M and the current revised projection was $1.986M; however,
staff expected this amount would be exceeded. Transfer taxes were tagged at $1.54M for FY 17;
however, Mr. Koenig stated that this revenue stream is approached with caution. He noted that
during high development years from 2006-2008, transfer taxes were as high as $3.4M or $3.6M;
however, when the bottom fell out of the real estate market, these revenues pulled back to
approximately $1M. Mr. Koenig indicated that this reversal tracked very closely with what was
experienced in the General Fund. He cautioned members to be very mindful of this in developing
the FY 17 budget, and did not recommend increasing to estimates of $1.9M or $2M for this revenue
stream. Mr. Koenig reiterated that municipal street aid was expected to remain flat for the current
year, and it was hoped that this number would track at approximately $673,000. He indicated that
transfers were proposed from the Water/Wastewater Fund and the Electric Fund, explaining that this
was a return on the City’s investment in the utilities and would help to keep property taxes down.
Transfers amounted to $875,000 from the Water/Wastewater Fund and $10M from the Electric Fund,
which were the same as last year. Total revenues proposed for the General Fund for FY 17 were
$42.37M.
Mr. Koenig reviewed some of the changes in departmental expenses in the General Fund Expense
Summary. He noted that there was an increase of 6.1% in the City Clerk’s Office, a fair change in
Library expenses, and a large change in total dollars of approximately $1.2M, or 8%, in the Police
Department. Mr. Koenig advised that the large increase in the Streets Division was predominantly
related to Municipal Separate Storm Sewer System (MS4) permit compliance and grass mowing and
ditch cleaning on land owned by the City at the Garrison Oak Technical Park. He stated that there
was a slight reduction of approximately $91,000 in Sanitation due to an expected reduction in
landfill rates. Facilities Management expenses were also reduced because the head count in that
division was declining as a result of the privatization of custodial services following the retirement
of several employees. Mr. Koenig noted that total departmental spending was increased by
approximately $2.2M or 6.8%. Referring to Other Expenditures, he advised that debt service was
being adjusted upwards; a contribution of $70,000 was proposed to the Downtown Dover
Partnership (DDP), which would keep the City’s transfer to the DDP flat for FY 17; and insurance
expenses and retiree health care were increased. Mr. Koenig stated that a total balance in
expenditures of approximately $46,820,000 was proposed. He indicated when expected revenues
are offset with the proposed expenses, the City would be in the hole by approximately$117,000;
however, to keep the budget in compliance with policy, approximately $1M would have to be added.
Página 4
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 4
If revenues are not adjusted, there would be a need to shave the General Fund by approximately
$1.1M to balance the budget.
Mr. Hutchison noted that the State had been discussing real estate transfer tax and questioned if
Mr. Koenig had heard whether the State would be taking some of these funds. Responding,
Mr. Koenig stated that the City met with legislators early in the fiscal year, when it seemed there
would be a lot of discussion regarding real estate property transfer tax; however, he had not heard
much more about this since August 2015. He indicated that this was the State revenue stream that
he was most concerned about. Mr. Koenig explained that transfer tax is now split 50/50, with 1.5%
going to the State and 1.5% going to the City. Last year 2.0% was proposed to go to the State and
1% to the City, which would result in a revenue loss of 17% or 18%. Mr. Koenig had not heard that
the proposed bill had been reintroduced, expressing his belief that legislators were waiting for final
Delaware Economic and Financial Advisory Council (DEFAC) numbers to be released. He stated
that this is one (1) of the largest revenue streams that the City receives from the State, and the
proposal discussed last year was significant and would result in a reduction to the City of several
hundred thousand dollars.
Mr. Sudler questioned the best way to shave the $1M needed to balance the budget. Responding,
Mr. Koenig stated that he thought that there would be discussions at all levels. He indicated the
possibility of going back to departments and asking for only what is necessary, or making an
adjustment to the General Fund capital plan which may involve deferring vehicles or reducing the
street program. Mr. Koenig informed members that requests from citizens regarding services were
continuing to escalate. He expressed the possibility of pulling back some of the MS4 funds for ditch
maintenance; however, he stated the importance of coming into compliance with this permit, so this
would not be first on the list. Mr. Koenig indicated that expectations in the Sanitation budget for
tonnages going to the landfill would be reviewed, as would vehicles, open positions, debt service,
and all types of issuances. He stated that everything that would maintain current levels of service
would be reviewed; however, it may be necessary to discuss cutting levels of service.
Mr. Sudler asked if there was a process for prioritizing residents’ requests for services and
determining those that would be met in a given year. Responding, Mr. Koenig stated that, in his
experience, residents typically express concern about the level of service at their house rather than
elsewhere. He noted that staff takes into consideration feedback from those who come to speak at
the budget discussions, Council, and social media; however, a majority of the requests received are
for additional or enhanced services at the same or lower cost.
Mr. Slavin asked if a 2.5% adjustment of expenses and revenues was needed to come into policy
compliance, and Mr. Koenig expressed his belief that this was correct.
Mayor Christiansen reminded members that one (1) of the functions of the Office of the Mayor was
to work closely with legislators. He stated that the current formula for the PILOT program was
being worked on and had been discussed with those in New Castle County who were tired of giving
money to the City of Wilmington. Mayor Christiansen indicated that other municipalities with State
of Delaware properties were being looked at. He was very comfortable that this matter would move
Página 5
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 5
forward in the legislature and that the current realty transfer tax formula would remain intact unless
DEFAC reports drastic funding problems. Mayor Christiansen advised that he and the City’s
standing committee chairs were planning an update and lunch with members of the Kent County
legislative delegation, along with key members of New Castle and Sussex Counties, to ensure that
the well-being of the City of Dover and other municipalities in the State would be looked after.
Mayor Christiansen felt that those in Legislative Hall would be amenable to suggestions and
recommendations developed since this was the middle of an election year. He indicated that he
would keep Council and staff apprised regarding anything that might affect funds from the State,
including DelDOT funding, community transportation funds, and municipal street aid.
Mr. Hare noted that some City positions that were vacant last year were still vacant. He suggested
that if a position remains vacant for six (6) months, it should be vetted through the Legislative,
Finance, and Administration Committee and Council before it is filled so that the need for the
position can be justified. Mr. Hare did not want it to become a habit for funds for such positions to
be used elsewhere, noting that it might be possible to eliminate them.
Mr. Hare asked if an inventory of vehicles and equipment would be provided, stating that supervisors
should be able to adjust schedules to keep vehicles to a minimum. Responding, Mrs. Mitchell stated
that the concept of sharing vehicles was discussed last year in relation to cost-savings ideas;
however, staff had not yet gotten into that process. Mr. Hare indicated that he would like to see an
inventory of all City vehicles and equipment by department to see if there were ways to share before
making purchases.
In regard to vacant positions, Mr. Koenig stated that the City had been actively recruiting for almost
every vacant position. He expressed his preference not to have to come back to Council every time
a position is open for six (6) months, noting that he had been hired to manage the budget.
Mr. Koenig advised members that there are unique instances in every department. For example, he
explained that, Mr. Harry Maloney, Electric Director, was in the process of changing the Electric
Department, hiring staff, and reorganizing positions as new people come into the organization.
Mr. Koenig felt that making sure the appropriate people are in the right place is a staff/manager level
decision, and he noted that some positions would be vacant for more than six (6) months. He
indicated that coming back to Council to simply ask if he can fill a position would add an additional
layer and burden of paperwork. Mr. Koenig felt that the budget could be managed as presented. He
noted that staff had been working on at least one (1) position in the Public Works Department that
had not yet been posted, explaining that, in some cases, positions in this Department had been
through two (2) or three (3) postings due to employees quitting after being hired. Mr. Koenig
pointed out that each department is unique and expressed the desire for Council to authorize the
positions and allow staff to execute the budget based on that.
Mr. Hare expressed his opinion that if someone was not hired within six (6) months of a vacancy,
the position was not that important. He reiterated his view that positions that remain vacant for more
than six (6) months should be vetted.
Página 6
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 6
Mr. Hosfelt stated that this matter was previously discussed last fall and Ms. Kim Hawkins, Human
Resources Director, had prepared a report for him in this regard. He questioned if this report could
be updated and given to all members of Council to provide a better understanding of recruitment,
and Mr. Koenig stated that this could be done.
Responding to Mr. Hosfelt as to whether employees were quitting due to the pay scale, benefits, or
other reasons, Mr. Koenig explained that some employees find the job different from what they
expected, others have left during the review period because they were not a good fit for the
organization, and some have transferred to another department. He noted that openings can cause
a cascade effect in the organization that affects four (4) or five (5) positions. Mr. Koenig advised
that there have been increasing discussions and complaints about the closure of the defined benefit
pension plan, and some employees feel that the defined contribution plan is a retirement savings plan
that is not the same as a defined benefit plan. He noted that this is a matter of perspective since the
City’s defined contribution plan is better than some private sector companies that do not offer
anything. Mr. Koenig stated that some employees had left or retired because they were unhappy that
the City was about to require health care cost sharing, and this was still rippling through the
organization three (3) or four (4) years later. He explained that there had been recent instances when
a selection was made for a position and the candidate asked for $3 or $4 per hour more than what
was offered, and staff did not have the ability to do this. He noted that in some cases union
negotiations had taken away a tool that private sector companies might be able to use since a union
did not want the City to leapfrog over staff that had been working with the City for a while. The City
had wanted to hire employees at levels ranging from A to E; however, the union wanted to use only
levels A to C.
Mr. Koenig expressed additional concerns about changes in the private marketplace that were
affecting employees, especially new, younger employees who may be covered by their parents for
health insurance and for whom the benefit package may not register. He advised members that the
hourly rate is what matters to these employees, but health insurance is a major part of the City’s total
cost for employment, and the City cannot convert the value of health care to an hourly rate addition
under any of the City’s union contracts because this is not an acceptable way to hire. Mr. Koenig
noted that in some cases municipalities not far from Dover are hiring at $2 an hour higher, and the
City has challenges in the workforce and in recruitment.
Mr. Sudler questioned if interim employees are selected to fill positions when employees resign and
how soon staff solicits, considers, and interviews prospective employees. Responding, Mr. Koenig
stated this would depend on the position and the part of the organization involved. In some cases
a position’s duties are absorbed by other employees in the office; however, there are interim
appointments at the department head level because someone must be the overall authority in the
department.
In regard to recruitment, Mr. Koenig explained that once an employee resigns it is up to the
department to fill out a written request to recruit and indicate that this is a position that is needed and
not a placeholder. This is submitted to the City Manager for review and forwarded to the Human
Resources Department. The sooner the department head submits paperwork, the sooner they get into
Página 7
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 7
the queue for advertising. Some departments focus a lot of time and attention immediately when
someone resigns; others take a more structured approach. Mr. Koenig indicated that there was not
an across-the-board answer to Mr. Sudler’s question, because department heads, in some cases,
control a portion of the equation to get everything in, have interviews scheduled, and make
selections.
Mr. Sudler asked if it would be beneficial for City Council to designate a time frame across the board
for all departments to solicit for positions. Responding, Mr. Koenig expressed his belief that this
was not necessary.
Mr. Hare concurred that a designated time frame was not necessary; however, he felt that if a
department head loses an individual and goes half a year before considering hiring someone, they
may not be the right person to be a department head in a key position. He believed they should
come before the Legislative, Finance, and Administration Committee to explain why it took so long,
noting that it does not take half a year to find a replacement in the business sector.
In response to Mayor Christiansen regarding venues where City employees are solicited, Mr. Koenig
indicated that very few positions are posted in the newspaper anymore; however, they are posted on
the City’s website and other social media outlets, and many are shared by City employees. Positions
are posted on all bulletin boards, and staff shares information with Delaware Technical and
Community College and has participated in job fairs there. Mr. Koenig indicated that the City had
held its own job fairs and, for some of the more technical positions, staff had advertised in national
journals. It was Mr. Koenig’s belief that related links are also sent to Delaware State University.
The number of applications received can range from four (4) or five (5) to several hundred,
depending on the time of year or the market. Mr. Koenig stated that a wide range of outlets is used
for jobs, and it may be a matter of whether people want to select the City as an employer. He noted
that it took quite a while to hire a number of technical jobs, such as engineering staff, and to fill the
Electric Director position. Mr. Koenig informed members that the services of a recruiter were
engaged for the Electric Director position and this did not work; however, staff received contacts
from people in the industry that had experience in this type of work. Mr. Koenig noted that
advertising for positions in trade journals, etc., can cost several thousand dollars. He assured
members that staff was always hoping to expand when reaching out to job applicants because each
department head wants to hire the best person available for their opening.
Mr. Anderson, noting that electric costs had decreased, questioned the reason for the slight increase
in funding for street lights and if these funds would be used for retooling or replacing street lights.
Responding, Mr. Koenig expressed his belief that the street light payment identified in the General
Fund was for electricity and maintenance related to those lights, stating that there was no proposed
change to the electric rate for FY 17. He indicated that lights were being added and the system was
getting bigger.
In response to Mr. Anderson as to whether the City continued to use temporary help, Mr. Koenig
stated that the City uses temporary help in the Grounds and Sanitation Divisions. He indicated that
there were difficulties with temporary help, noting that these individuals are required to pass
Página 8
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 8
background checks, are not allowed to drive because of CDL issues, and are restricted to pure labor
functions such as cutting grass, sanitation, and work in the Streets Division, such as collection and
assisting the sign painter. To Mr. Koenig’s knowledge, temporary help had not been used recently
in administration.
Mr. Koenig reviewed the Water/Wastewater Fund Summary, noting that there had been adjustments
to beginning balances. Under base reviews for FY 17, he indicated that staff was still assessing the
impact of revenues from Calpine. The total revenue for Water/Wastewater in FY 16 was slightly
over $15M and was projected at $15.8M for FY 17. Mr. Koenig pointed out slight growth in
wastewater revenues due to new connections. The total increase in revenue would be approximately
$89,500 for water/wastewater.
Mr. Koenig indicated that expenses in the Water/Wastewater Fund included transfers, the cost of
engineering, the cost of running the plant, etc. Wholesale changes were not requested in the capital
plan, and staff was trying to stick with the general authorizations that Council had expected over the
five (5) year period. Mr. Koenig informed members that debt service would be issued in the
Water/Wastewater Fund, noting that a treatment upgrade was planned for the Long Point Road
Treatment Plant and design was almost complete. Construction was currently estimated at
approximately $2.4M and the State revolving fund would be used for this. The State revolving fund
would also be used for pump station replacement and upgrade projects. Mr. Koenig felt that staff
was having success in working their way through capital project authorizations and starting to catch
up with the expenditures that Council had authorized in years past. The backlog of projects had been
decreasing over the last couple of years, although there had been times when it had been necessary
to come before Council to modify project budgets due to estimates that had been incorrect and bids
that had come in high. In some cases, projects had been finished under budget and project budgets
were transferred. Mr. Koenig stated that staff had focused on modifying the capital plan to stay
within the financial authorization of Council. He advised that all wastewater is sent to Kent County
for treatment, and this is a direct pass-through cost.
Mr. Hutchison questioned how the financial numbers from Calpine compared to projections, based
on the short period of time that Calpine had been in operation. Responding, Mr. Koenig stated there
was discussion early on that revenues were projected in the $1.6M range; however, this year’s
revenues for water were only projected at approximately $700,000 to $800,000 for the Garrison
Energy Center. He noted that it had been less than one (1) full year since construction finished and
there was a major outage in the fall while things were being finalized. Mr. Koenig indicated that the
City was seeing the ramp-up of this facility moving into the springtime, and he felt it would be
another six (6) months before there would be a true gauge of the final numbers. He indicated that
water revenues seemed to be slightly less than projected but the sewer revenues slightly more, noting
that Calpine may have been referring to both water and sewer when they provided the $1.6M figure.
Mr. Koenig informed members that Calpine is the top water user in the system and as their run
profile starts to solidify, the true revenue profile will be seen.
Página 9
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 9
In response to Mr. Hare’s request for clarification regarding Intrafund Service Fees and Bank and
Credit Card Service Fees, Mr. Koenig stated that the City’s customers use credit cards to pay bills
at Customer Service, but the City absorbs the transaction fees, which are allocated to the different
funds.
Mr. Hare questioned if the City should consider charging an additional 1.5% or 2% for those using
credit cards to pay, as many other companies do. Responding, Mr. Koenig stated that staff had gone
back and forth on that internally; however, he did not agree with charging customers an additional
fee, noting that a transaction cost is not paid for using a debit card at stores like Walmart. He
expressed the desire to encourage people to pay their bills and not avoid doing so because of the
credit card fee. Mr. Koenig felt that, with a perfect rate design, the City would assume that everyone
is using credit and this would be included in the rate; however, this was not the case currently. He
advised that payment procedures are slightly different from department to department, noting that
a customer cannot walk up and swipe a card to pay a bill in Customer Service but must go off to the
side and make a phone transaction, and the system is not where he would like it to be. Those who
pay for a building permit in the Planning Department can swipe a credit card.
In regard to Intrafund Service Fees, Mrs. Mitchell informed members that this is where
administrative costs for the City Manager’s Office, City Council, City Clerk, Finance, Human
Resources, Information Technology, Facilities, Fleet, and Warehouse are allocated to all three (3)
funds. This is calculated using formulas based on assets, personnel costs for Human Resources, and
the head count. Mrs. Mitchell indicated that Water/Wastewater Fund assets had climbed since more
projects had been completed, which drove their allocation percentage higher. The Electric Fund’s
percentage of those costs remained stable.
Mr. Slavin clarified that this was the business side cost of running the utility. He cautioned members
that when budget hearings are held in May, cuts are sometimes offered as a way of saving money in
the General Fund; however, 100% of that cost is not always saved in the General Fund because costs
are sometimes allocated across the three (3) different funds.
Mr. Sudler asked how long the City had been allocating for Intrafund Services. Responding,
Mrs. Mitchell stated that this had been done since the 1980s.
Mr. Neil stated his presumption that credit card costs had been negotiated at the lowest possible
level. He noted that volume retailers can get a lower rate and questioned if the City does that as well.
Responding, Mrs. Mitchell stated that credit card and merchant services are bid out when the City
bids out bank services and staff looks for the lowest rates.
Mr. Koenig pointed out, in regard to potential future rate changes for the water and sewer utility, that
when talking to the State water is a scarce resource. Staff spends a lot of time and energy trying to
plan the City’s water resources and make sure the City has the permits to pump out as much water
as needed from the system. The City is monitored closely by Public Health regarding the quality of
water and must pass inspections and testing. Mr. Koenig informed members that as allocation
permits have come up for renewal, modifying these permits has been discussed. In the past, there
Página 10
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 10
may have been eight (8) wells that were all at 1,000 gallons, but if a well can pump only 680 gallons,
that permit is adjusted down to 680 gallons. Mr. Koenig indicated that staff had been doing a lot of
permit management and discussion with the State about the incentive to value water as a resource.
He explained that when water is cheap, it is not valued as much as when it is expensive. When
discussing allocation expansion, the State looks at rate design, whether people are being encouraged
to save water, and if there is an active promotion of low-flow faucets and fixtures. Mr. Koenig stated
that when considering how to develop the City’s next water resource, discussion about rates will
become part of the equation. When the City applies for the State revolving fund, they look at the
City’s financial abilities and the bond market. Mr. Koenig pointed out that some private sector
providers have a tiered system where more water being used results in a higher rate being paid. He
felt that future rate design for the water and sewer utility would likely mirror that type of philosophy.
Mr. Koenig stated that this discussion was a precursor to consideration of the next rate adjustment
and advised members that they would see a proposal from his office regarding a block rate design.
Mr. Sudler asked if the City has incentive programs for residents to save water. Responding,
Mr. Koenig stated that staff does not go in and tell people to use low-flush toilets; however, new
plumbing codes for new construction and remodeling have requirements for things such as low-flush
and low-flow faucets. Behavior changes are also occurring as part of the sales market. Mr. Koenig
felt that the price of water in the City of Dover, at $3 per thousand gallons, was not driving people
to be more efficient in water use; however, such changes were being driven by the desire to save
resources or to change fixtures.
In response to Mr. Sudler regarding the plumbing code used by the City, Mrs. Ann Marie
Townshend, Director of Planning and Community Development, stated that the City had adopted
the 2009 code but the State had adopted the 2015 code and requires the City to use what they adopt;
therefore, the City had been using the 2015 code. Mrs. Townshend explained that the International
Code Council (ICC) comes out with updated codes every three (3) years. Since adopting new codes
every three (3) years would be a challenge administratively, in training code officials, and in working
with the development community, the City had typically done this every six (6) years.
Mrs. Townshend indicated that there had been discussion about adopting the 2012 code, which is
used by Kent County; however, the 2015 code had now been issued. She stated that the City would
either adopt the 2015 code, since they were required to use the plumbing and energy codes for 2015
by the State, or would wait until 2018.
Responding to Mr. Sudler, Mrs. Townshend advised that the 2009 codes were adopted by reference
in Chapter 22 of the City of Dover Municipal Code.
In response to Ms. Maucher regarding when the last cost of service rate design was performed,
Mr. Koenig stated his belief that the City had never had a true cost of service rate design done by a
consultant for the water/wastewater utility. He advised that the utility’s rate design was very
rudimentary. Mr. Koenig stated that it took approximately four (4) or five (5) attempts to get a
customer charge for the water rate on the water portion of the bill. In the future, when discussing
the inclining block, Mr. Koenig felt that the City may want to do a cost of service rate design, noting
that large customers have a substantial impact on the system that is probably not, from a rate design
Página 11
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 11
standpoint, being allocated and reported through those types of standards. Mr. Koenig stated that
the electric cost of service is very detailed and involves a lot of accounting and discussion; however,
in regard to water, staff looks at how much is pumped into the system, the losses, and the capital plan
and then develops a rate. Everyone is treated equally; however, Mr. Koenig felt that there would be
a need to look at the cost of service to get a fair allocation of costs as the City moves toward a more
modern utility.
In regard to expanding City water and water rights in new wells and aquifers, Mr. Anderson asked
if there were any potential cost increases in the future when drilling in deeper aquifers. Responding,
Mr. Koenig stated that there would be cost increases without question. He explained that the City
draws from three (3) aquifers: 1) the Columbia, which is the unconfined aquifer on the east side of
the City; 2) the Cheswold, which is a middle-depth confined aquifer; and 3) the Piney Point, which
is a deep, confined aquifer. Mr. Koenig advised that the State has not allowed very many, if any,
new wells in Piney Point because they are concerned about mining the water out of this aquifer;
therefore, Piney Point is the most difficult to get a new well in. He explained that the City was able
to drill a new well at Piney Point because two (2) old permits were given up, the permit location and
allocation were moved to obtain authorization to go into the aquifer, and there were no additional
allocations of water for this.
Mr. Koenig informed members that there seemed to be some room for expansion in the Cheswold
aquifer and a new well was being proposed in the capital plan for this. He indicated that staff
originally planned to go into the very deep Frederica aquifer; however, after working with the State,
it appeared that the City may be able to get into the Cheswold aquifer and get the appropriate
allocation at a mid-range depth, which would significantly reduce the cost of the well. Otherwise, it
would be necessary to go deeper than Piney Point to get water, which could lead to additional costs.
Mr. Koenig indicated that a permit was issued in the early 1990s at the Long Point treatment plant.
He noted that this area was under heavy influence of agricultural wells now and the City’s long-term
allocation there was shrinking. Mr. Koenig informed members that as much as 5M gallons were
expected to run through this plant when it was originally designed. The plant redesign 27 years later
was in the 3M gallon range, with the potential to expand to up to 4M. Mr. Koenig stated that in the
20 plus years that the plant had been in operation, it had probably never pulled even 3M gallons a
day from the aquifer. There was room for growth from the City’s system in the aquifer; however,
in the overall umbrella of the City, the City would be pulling from the confined aquifers, and the
costs would be significant when the City has to drill new wells. To Mr. Koenig’s recollection,
the cost was approximately $1.1M for the Piney Point well that produced approximately 600 to
700 gallons per minute.
Mr. Anderson questioned what would happen if there were expansions at the Garrison Oak
Technology Park, such as for Calpine. Responding, Mr. Koenig stated that the engineering
calculations for Calpine coming online indicated that the City would need a new tower immediately;
however, Calpine had now been running for nine (9) months. The tower was nearly ready to go into
service; however, the system went through the summer and the end of the last season without the
need for the tower to be online. Mr. Koenig explained that when engineering calculations are run
Página 12
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 12
for margins of safety and safe allocations, it is assumed that a major facility is offline, as if there
were a major fire going on, which creates a handicap. He advised that the system was currently
designed so that Block 1 would not affect allocation.
Mr. Koenig stated that if Calpine moves forward with Block 2, the City would look at the run profile
of Block 1, as well the expected demand from a second block. He noted that estimates for a second
block had ranged from 50MW to 520MW, and staff had not been able to get a definite answer from
Calpine on this. Mr. Koenig indicated there had been changes in the City’s Code since Block 1 was
authorized; therefore, if Calpine proceeds with Block 2, there would be no cap on their impact fees.
Mr. Koenig stated his belief that the impact fee for water and sewer for Block 1 would be more than
$15M; therefore, Calpine would have to make a significant capital transfer to the City for Block 2
under the current ordinance. This money would have to be used to offset an investment for more
supply. Mr. Koenig stated that the question, from an engineering standpoint, was whether the City
could accommodate Calpine if they wanted to proceed today. He indicated that he did not have this
answer tonight; however, the City is ready for those types of things to be introduced.
Responding to Mr. Neil, Mr. Koenig stated that City encompasses approximately 24 square miles;
however, the City’s electric service territory granted by the State is approximately 74 square miles,
which is almost three (3) times the size of the City. In regard to the water service territory,
Mr. Koenig estimated that 80% to 90% of the customers outside City limits are residential. There
are subdivisions outside the City that receive City water and in some cases, City sewer, such as
Rodney Village, Kent Acres, St. Jones Commons, and Wolfe Creek. Service areas extend beyond
the City perhaps five (5) to 15 square miles. Some customers outside the City have electric, water,
and sewer; some electric or water only; some have other combinations.
In response to Mr. Hutchison regarding the volume of calls regarding brown water with increased
water usage on the east side and the flushing of pipes, Mr. Koenig stated that there were
approximately 10-20 complaints reflected on a flushing report last week, and he expressed his
impression that the number of calls was down. He noted that there is a lot of water running through
the east side of the system when Calpine is running and the system is self-cleaning in some cases.
Mr. Koenig indicated that complaints had decreased from years past.
Responding to Ms. Maucher regarding the rate differential for in-City versus out-of-City customers,
Mr. Koenig stated his belief that this was spelled out in the Code and the differential was 50%. The
in-City rate is $3.00 for 1,000 gallons, compared to $4.50 per 1,000 gallons outside the City.
Expressing his opinion that $3 per 1,000 gallons seemed like a very good rate, Mr. Hare questioned
how often the City checks its water rates. Responding, Mr. Koenig stated that this is an excellent
rate from the customer standpoint. He explained that the Finance Department had solicited rates
from a number of municipalities, and a comparison of public and private providers would be
provided during the upcoming budget hearings.
Página 13
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 13
In response to Mr. Anderson, Mr. Koenig confirmed that the City’s rates are so low that Tidewater
Utilities buys water from the City and has three (3) active interconnections: 1) at Denney’s and
Kenton Roads; 2) at Denney’s Road and Carlisle Village, and 3) running south on State Street, which
feeds mobile home parks and other areas. Mr. Koenig explained that Tidewater has several of the
top 10 meters that produce for the City of Dover. They buy at the in-City rate at $3 per 1,000 gallons
and sell it in accordance with their tariff, which Mr. Koenig believed exceeds $8 per 1,000 gallons.
In regard to wastewater, Mr. Anderson noted that the City had put a lot of money into reducing
infiltration over the last five (5) years and asked if a benefit had been received from this.
Responding, Mr. Koenig stated that there had been a benefit. He noted that the Public Works
Department had submitted applications for the return of impact fee credits related to Inflow and
Infiltration (I & I) and he indicated that he would bring this report to the budget hearings. Mr.
Koenig explained that I & I is outside rainwater and groundwater penetrating into the sanitary sewer
system. He stated that this is a burden on the system that the City, as a utility, is paying extra to treat.
Mr. Slavin noted that the City sends rainwater to Kent County, who cleans it, and the City is charged
for this.
Responding to Mr. Anderson as to whether the City had been able to reduce the amount that the City
had been investing, Mr. Koenig indicated that he did not have those numbers with him but would
bring the data to the budget hearings.
In regard to credit cards and their effect on all three (3) funds, Mrs. Mitchell advised members that
in the past, all bank and credit card fees were netted against interest income; however, staff had made
an accounting change. For example, referring to the Water/Wastewater Fund Summary, Lines 12-13,
regarding water and wastewater interest, she explained that the figures for 2014/15 Actual were
negative because those fees were netted against the interest. Referring to Line 31, Bank and Credit
Card Fees, she explained that there was a zero balance, because staff did not have this information
segregated at that time. Mrs. Mitchell stated that staff had since segregated the bank fees, so the
interest earned increased in each of the funds.
In regard to the Electric Revenue Fund Summary, Mr. Koenig informed members that the Electric
Fund had slightly over $80M in revenue. He stated that the largest revenue was from Direct Sales
to Customer, which was projected to increase slightly by $712,000 or 0.9% because a slight increase
in the load profile was projected. Mr. Koenig reminded members that there had been a lot of conflict
and uncertainty in the industry. There had been fairly large expansions of commercial customers,
including the Edgewell/Energizer and Kraft Heinz facilities; however, the long-term load profile of
the utility was expected to be relatively flat. He noted that the utility is under a lot of influence from
people wanting to put in private solar and other measures that will affect the system. Mr. Koenig
indicated that there was a very slight increase in direct sales to customers, which cascades down into
utility tax revenue, and a slight increase in miscellaneous revenue. He noted that the transfer from
the Rate Stabilization Fund would be decreased for FY 17. Total revenues associated with the
proposed FY 17 budget would be roughly $81.3M; however, there was a very substantial beginning
Página 14
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 14
balance in revenues of approximately $93.9M, resulting in a total change of approximately $4.2M
or an increase of approximately 4.7% from FY 16.
In regard to expenses, Mr. Koenig informed members that the cost of power supply had been
decreasing, and this trend was expected to be realized in FY 17, although staff was still working on
related issues for FY 16. Mr. Koenig pointed out that PJM charges regarding transmission were
going up substantially, noting that it seemed that money was being moved from one (1) bucket to
another to adjust to how the system is charging the City for power from the grid. He stated that there
were additional capacity charges. Mr. Koenig indicated that power plant operations were proposed
to decrease slightly by approximately $217,000, and the total cost of power supply and generation
was approximately $49.1M.
Mr. Koenig pointed out that the transfer to Improvement & Extension (I & E) in the amount of
$2.5M was to keep the City’s infrastructure up to date. There was a $10M transfer to the General
Fund and transfers to the depreciation, future capacity and rate stabilization reserves, with transfers
totaling approximately $15.25M. The total budget balance and expenses resulted in a positive
balance of approximately $4.2M.
Mr. Koenig, referring to Line 62, Exceeds (Remains) to Meet Requirement, indicated that the
Electric Fund was over the policy requirements by approximately $5.15M. He advised that
adjustments were needed to this and the other funds, noting that one (1) of the capital projects
would influence the FY 17 budget and one (1) the FY 18 budget in the Electric Fund. Substation
replacements were also being discussed in the five (5) year plan, and whether cash would be paid
or debt would be issued for these things. Mr. Koenig reiterated that the Electric Fund had a positive
balance; however, this number would be refined moving forward as proposals related to the Electric
Fund are made in the final budget discussions.
Mr. Blakeman, referring to Line 13, Power Supply, of the Electric Revenue Fund Summary, noted
that the cost of power supply was projected to decrease by $6.8M or approximately 29%, and asked
if this was a one (1) year anomaly or was anticipated to be an ongoing trend, and if this was a fixed
cost that is projected out. Responding, Mr. Koenig advised members that Mrs. Mitchell had
indicated that these figures reflected the open hedge position as well as the purchase position, so this
was why there was a large decrease in power supply but an increase in PJM transmission and fees.
He stated that there is some influence in the hedge purchasing moving forward.
Mr. Blakeman asked whether hedging was bringing the price down and if the City was still buying
the same number of kilowatt hours. Responding, Mrs. Mitchell explained that this was not the case.
She explained that there was unhedged energy since hedges were not 100% covered. The hedges
are included in the power supply, but the PJM figures reflect buying off the market and are the offset
to what the City has not hedged. Mrs. Mitchell stated that the City may be 100% hedged in the
current year, but may be only 80% hedged in 2017, the out year. Mrs. Mitchell stated that the figures
represented the hedges that are in place. The unhedged energy comes from the PJM; therefore, these
two (2) figures must be netted together.
Página 15
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 15
Mr. Blakeman asked if this discussion pertained to the PJM spot market energy, and Mrs. Mitchell
confirmed this. Mr. Blakeman indicated that this was decreased by approximately 52.9% in FY 17.
Mrs. Mitchell stated her belief that the unhedged energy was included in the PJM Charges -
Transmission and Fees, on Line 19 of the Electric Revenue Fund Summary. Mr. Blakeman
questioned if transmission and fees included energy rather than services for transmission.
Responding, Mrs. Mitchell stated her belief that the unhedged energy is included in the PJM energy
and transmission, and the projection was increased by approximately $4.3M for FY 17 because this
was the unhedged portion. She confirmed that transmission fees include some energy; however, she
indicated that she would have review this to make sure that amounts were in the correct place.
Mr. Blakeman noted that capacity charges were approximately the same for FY 17; however, the
capacity credits were decreased by approximately 29%. He questioned if this decrease in the cost
of capacity was an ongoing trend. Responding, Mr. Koenig stated that a temporary dip was projected
for FY 17 and a temporary rebound was then projected for a couple of years, followed by what he
felt could be termed as some question marks.
Mr. Blakeman asked if transmission and distribution under direct expenditures were decreased due
to a reduction in manning or material costs. In response, Mr. Koenig stated that this was being
driven by the reductions in pension and OPEB funding since the City was on schedule in this regard.
He noted that the City had to put extra money in for a while, but this had now leveled off and started
to decline in the Electric Fund. He reiterated that this was the City’s only fund in this position.
Mr. Anderson asked at what percentage the City was covered for price increases or hedging for
FY 17. Responding, Mr. Koenig stated his recollection that the target when entering the budget year
on July 1, 2017 would be approximately 80%. He indicated that the City was getting close for
FY 18, and some of the other purchases made for some of the out years were close to 80%.
Mr. Koenig advised members that the City would be right at or a little above 80%.
Noting the decline in capacity credits, Mr. Anderson questioned whether the City was getting less
in capacity credits because the cost of power was down, and he inquired if these items track together.
In response, Mr. Maloney stated that the drop in the City’s capacity credits was due to an outage
during the peak period in the last week of February 2015. He indicated that the City took a
temporary hit that was showing up in this year’s budget. Mr. Maloney stated that there was a need
to go out and find replacement capacity, and this was the added cost. He projected that this should
be a one (1) year rebound, noting that in this capacity planning year the City had been doing very
well and there had not been any outages.
Mr. Neil noted that two (2) of the old plants would be going offline and questioned if this was
reflected in the calculations. Responding, Mr. Maloney stated that buying replacement capacity for
these plants would not be reflected until FY 18.
Mr. Koenig reviewed the Governmental Capital Projects Fund Summary, which identified the
different revenue sources and predicted expenditures related to the capital plan for each department.
The proposed revenue and expenditures were approximately $11.3M.
Página 16
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 16
Mr. Anderson indicated that a developer had made a PILOT payment and questioned why this did
not appear in the budget for the Parkland Reserve. Responding, Mrs. Mitchell advised members that
none of the reserve funds were included at this point, but they would be included when the budget
is brought forward in May. She indicated that staff had focused on the three (3) major funds for this
presentation.
Mr. Koenig reviewed the Water/Wastewater Improvement & Extension Fund Summary, which had
a total beginning balance and revenues of approximately $7.8M between the two (2) funds. There
were expenditures of $1.33M in water, slightly over $2M in wastewater, and $1.2M in treatment
expenses. He advised that total expenditures were roughly $4.5M, which would cover capital
improvement and vehicle purchase expenditures.
Responding to Mr. Hare, Mr. Koenig stated that detailed information regarding the vehicles was
provided in the Preliminary Capital Investment Plan - FY17 thru FY21, and staff would come back
with a presentation on vehicles as part of the overall budget. He indicated that this evening’s
meeting was for a general overview of the expected expenses by category.
Mr. Koenig reviewed the Electric Improvement & Extension Fund Summary, noted that it was
related to capital projects. He stated that a portion was for generation, transmission and distribution,
electrical engineering, and meter reading.
In summary, Mr. Koenig stated that the Electric Fund, while challenging, was going fairly well,
noting that the electric system received a reliability award during the City Council meeting held the
previous night. He stated that this was an important award from an economic development and
customer service standpoint. Mr. Koenig indicated that this was a reflection of the dedication of
staff in keeping the system running, the City’s continuing investment in keeping the system running
24/7 with very few interruptions, and the City’s return on this investment.
Mr. Koenig advised members that there were challenges on the water and sewer side. The City had
not quite reached the revenue plateaus that were originally promised for Calpine, but staff was
working through some of the actual run profiles to see what the final revenues would be. The City
was investing in the expansion of the supply side of the system, water pumping stations, the water
treatment plant, renewals and replacement of pipe to improve water quality, and increased
diameters in pipe sizes. He indicated that, when taking on new developments, the electric and
water/wastewater systems are getting bigger and there are more customers, so there is an opportunity
to expand these systems and increase the revenues associated with them. Mr. Koenig stated that
challenges associated with the water/wastewater system were the future rate design issue, the future
structure of water, and the continued focus and effort on renewals and replacement of the system,
noting that, in some cases, pipe had been in the ground for 100 years and was still performing.
Mr. Koenig reiterated that the biggest challenge would be in the General Fund, as it had been for a
number of years. There were some positive things over the last few years, including an uptick in
realty transfer taxes and increased construction activity. He noted that an increase in houses being
built results in new commercial structures being built. Mr. Koenig felt that these were good signs
Página 17
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 17
for revenues coming into the local government, since the City derives a substantial amount of
revenue from property transfers and construction-related activity. When the economy is moving in
the City and there are real estate transfers, this usually equates to the City’s budget improving from
an overall revenue standpoint. Mr. Koenig stated that challenges associated with the General Fund
include increased public safety spending for the police and potential fire purchases going forward,
as well as increased spending related to the MS4 permit. He advised members that there was not a
recommendation in the current proposal for non-bargaining salaries; however, all of the labor
contracts that had been signed and were in place were reflected in the proposal. Mr. Koenig
indicated that there was an uptick in health care costs, but these were being offset, in some cases, by
decreases in funding to the Electric Fund. He also noted that there was some pension cost escalation
related to the General Fund. Mr. Koenig indicated that staff would be bringing forward some
discussions regarding how to fund public safety in the budget hearings, but staff was very conscious
of the heavy lift that Council did with regard to the property tax rate increase last year and was
committed to maintaining that property tax rate. Staff felt that, with some minor adjustments, the
current level of service could be delivered within the current tax structure.
Mr. Slavin stated that the proposed capital plan would be reviewed at a later date.
Mr. Anderson questioned what formula was being used to project transfer taxes. Responding,
Mrs. Mitchell advised members that the last three (3) to five (5) years in the Municast forecast model
provided the basis for the preliminary numbers in the draft budget. Changes in these trends are
reviewed and, based on that, staff prepares an estimate looking at the year to date. Mrs. Mitchell
stated that staff does not look at property sales, noting that considering just the number of sales
distorts the estimate. She indicated that trends in residential housing are fairly stable, so staff uses
these figures and ramps them up to account for what they think may be the large receipts, such as
those for apartment complexes. Mrs. Mitchell noted that there had been several large receipts in the
current fiscal year totaling more than $0.5M, which occurs in some years and not in others, so staff
tries to be conservative in their estimates.
In response to Mr. Anderson regarding how confident staff was with revenue numbers, Mrs. Mitchell
stated her personal level of confidence at 90% - 95%. Mr. Sudler asked what would be included in
the missing 5%, and Mrs. Mitchell indicated that she did not know what might be missing but, as
a precaution, she did not want to say that staff felt 100% confident.
Mr. Koenig stated that in general he was very confident in the overall numbers. He stated the desire
to take one more look at both the expense and revenue sides coming into the final budget
presentation. Mr. Koenig indicated that the transfer tax is somewhat challenging from the
administrative side and he did not want to overestimate it. He did not want the transfer tax to be the
budget balancer, because he felt this would be a slippery slope from the administrative side. In
regard to property taxes, Mr. Koenig indicated that Mrs. Cheryl Bundek, Tax Assessor, would
probably be asked once more if she was sure of the numbers or if there would be changes; however,
he felt this would not fluctuate very much. He stated that staff now accounts for exemptions that are
issued, and the number presented was the number that staff expected to receive during the budget
year based on current calculations. Mr. Koenig indicated that staff may review permits, licenses, and
Página 18
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 18
Planning Commission authorizations to see what has happened during the past few months, but he
did not expect large changes amounting to several hundred thousand dollars.
In response to Mr. Anderson as to when members would hear proposals resulting from the public
safety study being conducted by the Center for Public Safety Management, Mr. Koenig stated that
fire and Emergency Medical Services (EMS) recommendations were available on the City’s website.
He expressed his desire for the consultant who prepared the report to provide a presentation to
Council or the Council Committee of the Whole; however, this had not been scheduled and it was
uncertain if it would occur before, during, or after the end of the budget hearings. Mr. Koenig
indicated that the consultant had done a site visit two (2) or three (3) weeks ago regarding the police
portion of the study. He expressed his hope that this report would be finalized and made available
in the next six (6) to eight (8) weeks.
In response to Mr. Shevock as to whether the decreasing landfill fees are offset by recycling fees,
Mr. Koenig stated his recollection that the reduction in tipping fees was between $6.00 and
$10.00 per ton. He explained that the City typically signs a differential disposal fee agreement with
the Delaware Solid Waste Authority (DSWA) that sets the City’s fee for a three (3) year period, and
this agreement is approved by Council. Mr. Koenig noted that the DSWA is the City’s only option
for solid waste disposal. He advised members that there had been some difficulty with the
performance of the City’s recycling contractor and thought it likely that there would be internal
discussion and proposals at the administrative level regarding how the City would handle recycling
in the long run. He stated that the expense for the contractor exceeds the reduction in the landfill
tipping fee; therefore, there was a net increase in expenses and staff was not happy with the service.
Mr. Koenig indicated that he would like to implement weekly recycling since he believed this would
increase the amount of recycling, noting that this would create some operational problems. He
indicated that he would not be bringing this proposal for the FY 17 budget. Mr. Koenig explained
that currently there was a need to separate waste and touch it more times, so costs were going up.
Previously, customers put yard waste, household trash, and recycling in a 90-gallon, black trash
containers, which were picked up and dumped by the City; however, staff was now under pressure
to separate recycling, household garbage and yard waste, and bulk trash and yard waste are also
picked up. Mr. Koenig stated that the service was being stretched. There were also challenges in
areas with higher density or smaller properties, with limited space for setting out containers while
allowing distance between containers and space for cars. Mr. Koenig indicated the need for the City
to adjust and modify service delivery, and to discuss this with communities, noting that there may
not be a one (1) size fits all for communities. He stated his belief that sanitation service would be
modified over the next several budget cycles. Mr. Koenig stated that some customers have recycling
every week but not trash, which is difficult for the City as a service provider to adjust to. He
indicated that the City was having difficulty providing levels of service that customers are happy
with, and the sanitation budget is challenging. He reiterated that at this point the tipping cost
reduction would not cover the cost of recycling or enhanced recycling. Costs were close, but there
was not a one (1) to one (1) ratio.
Página 19
COUNCIL COMMITTEE OF THE WHOLE
MEETING OF APRIL 12, 2016 PAGE 19
Mr. Neil moved for adjournment of the Council Committee of the Whole meeting, seconded
by Mr. Hosfelt and unanimously carried.
Meeting adjourned at 8:01 p.m.
Timothy A. Slavin
Council President
TAS/TM/js/dd
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Minutes\2016\04-12-2016 CCW.wpd