Este texto se extrajo de el PDF de forma automática y puede contener errores. El PDF es el registro oficial, así que consúltelo antes de confiar en esto.
3 páginas tienen poco o ningún texto legible aquí, a menudo por ser escaneos o dibujos. Para verlas, consulte el PDF.
Página 1
CITY OF DOVER BOARD OF ADJUSTMENT
AGENDA
Wednesday, February 17, 2016 at 9:00 AM
City Hall Council Chambers
15 Loockerman Plaza, Dover, Delaware
ROLL CALL
APPROVAL OF AGENDA
APPROVAL OF MINUTES of January 13, 2016 Meeting
NEW BUSINESS
Applicant #V-16-01
420 W. Reed Street, 105 S. Kirkwood Street, 107 S. Kirkwood Street. MauTiste Investment Group c/o
Michael Maupin has requested a variance from the requirements of Zoning Ordinance Article 4 §4.2
pertaining to the minimum lot dimensions, minimum setbacks, and maximum lot coverage for duplex/one-
family semi-detached dwellings in the RG-1 zone. Subject property is zoned RG-1 (General Residence
Zone). The Tax Parcels are ED-05-076.12-02-65.00-000, ED-05-076.12-02-64.00-000, ED-05-076.12-02-
63.00-000. The owner of record is MauTiste Investment Group.
ADJOURN
29 Del.C. § 10004(e)(2)
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS
SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS,
INCLUDING EXECUTIVE SESSIONS.
Página 2
CITY OF DOVER
BOARD OF ADJUSTMENT MINUTES
January 13, 2016
A Regular Meeting of the City of Dover Board of Adjustment was held on Wednesday, January
13, 2016 at 9:00 A.M. with Vice Chairman Colonel Ericson presiding. Members present were
Vice Chairman Colonel Ericson, Mr. Senato, Mr. Keller, and Mr. Hufnal. Mr. Sheth was absent.
Staff members present were Mrs. Townshend, Mrs. Purnell, Mr. Cook, Mr. Diaz, and City
Solicitor Nick Rodriguez.
APPROVAL OF AGENDA
Mr.Hufnal moved to approve the agenda with the removal of Application V-16-01, seconded by
Mr. Senato and unanimously carried 4-0.
Mrs. Townshend stated that a follow up mailing was sent to the parties that were notified of the
application for awareness.
APPROVAL OF THE REGULAR BOARD OF ADJUSTMENT MEETING MINUTES
OF DECEMBER 16, 2015
Mr. Keller moved to approve the meeting minutes of December 16, 2015 with the necessary
corrections, seconded by Mr. Hufnal and unanimously carried 4-0.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATION
Mrs. Townshend, Director of Planning and Community Development stated that the meeting
would be conducted in accordance with the agenda. There is one item (new application) on the
agenda under New Business. The application file will be read, and the floor will be opened for
questions of the applicant by the Board and for public testimony. If the Board needs to consult
the City Solicitor they will adjourn to discuss legal matters. If the applicant must leave, they can
contact the Planning Office at 736-7196 to learn of the Board’s decision. A formal notice of the
decision will be mailed to the applicants. Approved variances expire after one year if the
approved project has not commenced.
All public notice for the new application on the agenda today was completed in accordance with
code requirements. The meeting agenda was posted in accordance with Freedom of Information
Act requirements.
NEW BUSINESS
Applicant #V-16-02
104 South New Street. James Dowd has requested a variance from the requirements of Zoning
Ordinance Article 3 §2.1 pertaining to permitted dwelling unit types in the RG-1 zone, and Zoning
Ordinance Article 7 §1.13 related to nonconforming buildings and uses, in order to reestablish the
use of the structure as a two-family dwelling unit. Subject property is zoned RG-1 (General
Residence Zone). The Tax Parcel is ED-05-067.14-01-70.01-000. The owners of record are James E.
and Joann C. Dowd.
Página 3
CITY OF DOVER BOARD OF ADJUSTMENT JANUARY 13, 2016
Mr. Diaz Exhibits for the record: Staff Report and plans submitted by the applicant, and a photo
taken by the Code Enforcement Officer. The legal notice was published in the Delaware State
News on January 3, 2016, and the public was notified in accordance with the regulations.
Mr. Eddie Diaz gave a brief overview of the application.
Vice Chairman Colonel Ericson questioned if there was any member present who had a conflict
of interest and there was none.
Representative: Mr. James Dowd, Owner
Mr. James Dowd was sworn in by Mr. Rodriguez.
Mr. Dowd testified that he purchased the property in 1990 and has been the owner for roughly 25
years. He purchased the property as a two-family home. Sometime prior to his purchasing the
property it was split into two dwelling units. He stated that he knew that ignorance is not
withstanding the law, but he was not familiar with the nonconforming use provisions. In the past
two (2) weeks since filing the petition he has read over some of the City of Dover ordinances and
articles which consist of over 1200 pages. He has been an abiding landlord in the City of Dover
for 25 years. He has always complied with the annual inspection requirements and kept the City
informed. In May 2014 the City scheduled an annual inspection and came to the property with a
contractor who sometimes represents him. The inspector found some questionable foundation
issues from the outside of the home. As a result of the findings he was forced to get an engineer
(Scott Engineering) to go under the building for better photos. Once the engineer came from
under the building he stated that due to the age of the building (nearly 100 years old) some of the
piers used to hold the floor joist and beams under the house had deteriorated because they did not
use footers in the past.
There was deterioration on the outside wall of the building that was noticeable. The other
outside wall appeared to be bowing. Mr. Dowd was given a laundry list of items that needed to
be corrected and asked that he find a contractor to correct these. It took him roughly two (2)
months to find the first contractor that would crawl under the house. Due to the improved
economy no one really wants to do this type of work. It also appeared that because of the
property location people did not feel comfortable leaving their tools laying around. Two
contractors walked off the site because they could not have their employees working in those
conditions. Starting out as a young investor and owning the house for 25 years he has dealt with
these conditions as well as worked with the City and House of Pride as this is low income
housing to make things better. Once he found another contractor who could do the work, the
contractor stated that he would only be available to do the work on weekends due to his full time
job. This was an ongoing process, including the inspections, due to the work only being done on
the weekends. He also agreed to do this to save money as he has to pay the contractor each time
he comes out to do work. Mr. Dowd also wanted to do some of the work himself. Again,
ignorance is no defense but the non-conformity issue never crossed his mind because the City
was contacting him about inspections and vacant house permits on an ongoing basis. He then
filed for two (2) vacant house permits because he no longer had tenants in the building. After
doing that, he thought that he was good.
2
Página 4
CITY OF DOVER BOARD OF ADJUSTMENT JANUARY 13, 2016
The contractor continues to do work and they noticed old drywall, light fixtures, switches and
outlets that needed to be grounded or replaced. Therefore he started to do this work in addition to
what was already being done. Most of the homes in the area are falling apart. He took upon
himself and told his wife that this was a perfect opportunity to bring this home back to life. This
slowed the process and he completely ripped the drywall out from downstairs where the
foundation was being done and replaced it with new drywall which required a permit. He took
out all of the kitchen cabinets and hardwood flooring. He replaced all of the flooring with two (2)
layers of updated flooring. Afterwards he and his wife were getting anxious about finishing up
this project and that is when he was contacted by the Planning Office that he would be receiving
a letter to shut down his nonconforming use and he had to restore the home to a conforming use.
He spoke with the contractor and asked what did that mean, and the contractor replied that they
still needed to finish the foundation work that was 99% complete. He asked the contractor the
additional burden or cost. The contractor estimated $10,000, but keeping in mind that he had
already spent $25,000 on a home that is literally worth only $25,000. He petitioned today that
based on the work that has been accomplished, that the home has been restored to structural
soundness, by his unawareness about the nonconforming use provisions of the Zoning
Ordinance, and by his following other permitting and inspections rules, by his recent
understanding of the ordinances, he would exceed the reasonable use of this property. He would
not be able to maintain the property because it is not reasonable to continue to put more capital
into the building that is already not worth the $25,000 already put in. He felt that he had to write-
off a total loss of $25,000 and a year’s worth of work due to his ignorance. Now the City does
not want to issue him a nonconforming permit. At the end of the day it is a low income
neighborhood, however; there are some good people out there, they are not all bad.
Mr. Dowd felt that he could provide the people valuable low income housing in a remodeled
home in that neighborhood that is currently about 90% complete.
Vice Chairman Colonel Ericson asked if there were any questions.
Responding to Mr. Keller’s question regarding the date of the photo of the house, Mrs.
Townshend stated that the photo of the house was taken last week.
Responding to Mr. Keller’s question if the house was currently divided for two (2) separate
entries and two (2) separate living units, etc. as a multi-family property, Mr. Dowd stated yes.
Responding to Mr. Keller’s question regarding the location of the second entry and if there was
any pass through within the house for one family to another, Mr. Dowd stated no sir.
Responding to Mr. Keller’s question whether each entry has its own bathroom and kitchen
facility and if he paid the water bill, Mr. Dowd stated yes. There are also separate electrical
panels and separate heating systems. The only thing that is not separated is the water. The
Landlord pays the water bill and he pays the water bill for this property.
Mr. Dowd also noted that contrary to the staff report comment that electric service had been
3
Página 5
CITY OF DOVER BOARD OF ADJUSTMENT JANUARY 13, 2016
disconnected, he stated that electric had been on in the building since it became vacant, because
electricity was needed in order to have power to the tools to get the work completed.
Responding to Mr. Keller’s question of the current status of the initial foundation problem, Mr.
Dowd stated that it is about 95% complete. He shared photos of the work.
Responding to Mrs. Townshend question if there were copies of the photos that Staff could keep
for the record, Mr. Dowd stated that Staff could keep the copy that was circulated.
Mr. Dowd gave a brief description of the photos and work completed. Once the upstairs was
complete he asked the Planning Office on December 17, 2015 if it could be occupied since the
foundation inspection had been approved.
Responding to Mr. Keller’s question if it was on crawl space and not a full basement as he
looked at the photos, Mr. Dowd stated yes. It was very difficult to get a contractor to work under
the crawl space.
Responding to Mr. Senato’s question whether the first photo was the crawl space, Mr. Dowd
stated that it was the crawl space that showed all of the new floor joists and beams. At one point
he got ahead of himself and had ten (10) of the footers inspected and then the inspector came
back and stated that he needed to see the other three (3), the inspector needed for him to cut the
floor out so that he could physically inspect the other three floor joists and beams. The floor was
completed in early November, but in late November is when he had to cut the floor out in order
to have the inspection done.
Responding to Mr. Senato’s question for clarification whether there was a brand new floor
installed and a space in the new floor had to be removed in order for the inspector to do an
inspection and then redo the floor again, Mr. Dowd stated they were in the process of putting the
floor back down.
Responding to Mr. Senato’s question whether the crawl space at that time was completed, Mr.
Dowd stated that minus three (3) piers that was added by the inspector. Once it was opened the
inspector stated that those three piers needed to be added.
Responding to Mr. Senato’s question whether there was access to the crawl space, Mr. Dowd
stated the metal back door gave access to the crawl space. Mr. Dowd stated that he was not
present and the inspector told the contractor and the contractor relayed the information to him
once he arrived.
Vice Chairman Ericson stated that this was beyond the scope and does not apply. The Board is
looking at the criteria of the code.
Mr. Senato stated that in his opinion he was also looking at the hardship.
Mrs. Townshend stated that if Mr. Senato wished to challenge the inspections technique by the
inspector she would prefer that the inspector be present, because the insinuation from the
4
Página 6
CITY OF DOVER BOARD OF ADJUSTMENT JANUARY 13, 2016
question is that the inspectors created a hardship condition and there may be very clear reasons
why they made that request.
Mr. Dowd stated that he was not questioning the inspection. He was completely subservient to
the inspector. He wanted to get the house completed. If it was going to cost him another $800 to
replace the floor that he had to tear up, at that point it did not matter to him because he wanted to
get it done. He wanted it fixed correctly. It took him a long time because he wanted to bring this
home back to the right condition, not just what needed to be fixed, and at that point he was
committed.
Responding to Mr. Keller’s question whether the principal purpose of the condemnation in 2014
and the necessary repairs were in fact the foundation failure and footer requirements, Mr. Dowd
stated yes.
Responding to Mr. Hufnal’s question whether in 1998 when the property was used as a rental
was it a double rental at that time, Mr. Dowd stated yes.
Responding to Mr. Hufnal’s question whether the code changed in 2004, Mrs. Townshend stated
that there were code changes in 2001, 2003, 2006, and 2015 all too some degree dealing with
these issues. She could only speak first hand to those that occurred in 2006 and 2015. In 2006 the
code was changed whereby previously multi-family dwellings, and conversions of single-family
to multi-family dwellings were a Conditional Use in the General Residence Zone. The code was
changed so that multi-family dwellings were only permitted in the RG-2 zone as a Conditional
Use. Therefore; it would not be permitted at all in the other zones. In 2015, the ordinance
changed so that multi-family dwellings are not permitted at all in one-family residence zones.
This property falls in an “in-between area” because by definition a multiple dwelling consists of
three or more units. This structure is two units, but it is not a one-family dwelling. It falls outside
of the scope of what’s permitted.
Mrs. Townshend stated that the Building Inspector is available to talk about the footing
inspection if necessary. Vice Chairman Ericson stated that he did not see a need unless the other
Board members needed him to speak.
Mr. Senato stated that he was not questioning the integrity of the inspector. His first thought was
if it was an old floor that had to be repaired then that’s one thing, but in his mind it was a
hardship put on the owner with a new floor that he had to tear up based on the instructions of the
inspector and then he had to pay more money to put it back. He was not questioning the error of
the inspector.
Mrs. Townshend stated that she did not agree with Mr. Senato because typically the sequence of
inspections you would get that inspection before you put down the flooring. She did not believe
that anyone was necessarily in the wrong. Her concern was the way the question was asked
which indicated that the request of the inspector to inspect the footings created a hardship. It
really has more to do with the sequencing of inspections.
Responding to Vice Chairman Ericson’s question why the RG-1 area was changed, Mrs.
5
Página 7
CITY OF DOVER BOARD OF ADJUSTMENT JANUARY 13, 2016
Townshend stated that the RG-1 area was changed, but she was not sure which specific
amendment happened in 2001and 2003, but prior to those amendments conversions of single
family homes to multi-family homes was allowed. In the 2001-2003 timeframe it was changed to
a Conditional Use. The regulations regarding student housing came into effect in 2001- 2003. All
of this was the result of the concern that the downtown neighborhoods were eroding because of
the carving up of old homes into apartments and the adverse effect it had on homeownership. If
it is a multi-family structure it is not owner-occupied and some of the external effects were
causing other owners to move out. When you look at over 20 years of that practice we can agree
that it damaged the integrity of that community.
Responding to Vice Chairman Ericson’s question whether the property owners are notified when
changes are made to the Zoning Ordinance, and how does the information spread throughout the
community, Mrs. Townshend stated that the text amendment to the Zoning Ordinance is posted
as a legal ad in the Delaware State News, hearings at Planning Commission and City Council
and on the published agenda. There is no direct mail to the property owners.
Responding to Vice Chairman Ericson’s question whether the applicant was aware of the RG-1
zoning ordinance changes where the multi-family homes would be converted to single family
homes, Mr. Dowd stated that he cannot say he was aware of specifics, but he was aware that the
City no longer allows conversion of single family homes. This information was through word of
mouth, not any information that he read. He knows that this is the target area to clean up, but
again by word of mouth, nothing official. He read the 1,200 pages of the ordinances in part last
night.
Responding to Mr. Hufnal’s question when the applicant received the permit to do the work was
he aware that if he did not have the work completed within a year that his nonconforming use
would expire, Mr. Dowd stated no. He stated that he could have completed just the foundation
work that forced him to go 13-14 months in about 90 days if he was aware. However; his focus
was getting the home as close as he could back to the original interior.
Mr. Dowd stated that there were very few things that were identified during the initial inspection
when the house was condemned. Some of the items were the questionable foundation, getting an
engineering firm. Once he had the engineer firm (Scott Engineering) he gave him a listing of all
the items identified. There was an electrical issue because they could not find the ground in a
couple of the outlets. The electrical inspector suggested putting a GFCI outlet in the whole house
to avoid looking for the ground connection. He then brought three (3) GFCI outlets at $50 each
to install in the apartment. He replaced an outside dented door and paid someone to paint the
upstairs. He was now thinking that someone would be able to move upstairs while he was
working downstairs so that he could recoup some of the money that he had spent, but that never
took place. He then spoke with the Planning Office around the 16th or 17th of December and
asked if he could move someone in upstairs because the foundation was complete. At that point
he learned that it was a nonconforming use and was told that it needed to be converted back to a
single-family home.
Vice Chairman Ericson stated to the applicant that he was not the first person in that area to
come before the Board requesting a variance. Most people who come forward did not want to
6
Página 8
CITY OF DOVER BOARD OF ADJUSTMENT JANUARY 13, 2016
invest money. In the past the Board denied many variances because it was the long range intent
of the city to clean up that area. The reason the applicant wanted the variance was because he
was not informed of the change, if the variance is granted based upon that criteria every other
property owner in the area would say the same thing. Once a precedent is established the Board
would have to say yes no matter what and that would put them in a terrible position because of
the code. Vice Chairman Ericson gave a brief overview of the code and asked if the applicant
had any questions.
Mr. Dowd stated that ignorance is not a defense. He felt that as closely as he has worked with the
city throughout the last 14 months on this project, it should have been brought to his attention
sooner. He can only refer to the article regarding reasonable use of the property. If he had to
invest more money converting the property back to a one-family dwelling, including furnace
replacement, new ductwork, new electric, gas service, and more, this would be another $10,000.
He has already invested $25,000. There is a remodeled house that has been for sale across the
street for $40,000 but has not found a buyer. If he continued the remodeling project he would
exceed the value of the home. He did not think that any investor or wise person that manages
their money would intentionally go out and exceed the value of the home doing a project or
converting it back. He understood what Vice Chairman Ericson had stated about the ordinance
and other people coming forward later, but other people do not spend $25,000. The homes that
are being mentioned are the homes that have been vacant, non-active, and no construction
activity. He even put in new windows and vinyl siding. The first floor is going to be brand new.
The other people are the absent landlords. He stated that he did not want to fall in the mix
whereas everyone in the room thinks he is the absentee landlord because he is not. He did not
know how it is explained to the person from New Jersey that comes down and is fighting the
same case. He stated that he is different than most of the people that the Board is referring to.
Responding to Mr. Hufnal’s question whether the applicant had known about the non-
conforming use, would he have done the repairs that were necessary in order to get it back into
living condition for the two family units, Mr. Dowd stated that it was exactly true and he could
have easily done it within the 12 month window. He corrected additional items that he saw that
needed to be repaired instead of just doing what he was asked to do to become legal again.
Responding to Mr. Senato’s question whether there were two (2) separate entrances to the
apartment and how long had the two separate entrances been in existence, Mr. Dowd stated that
when he purchased the house it had the two separate entrances. He purchased the house in 1990.
Responding to Mr. Senato’s question that during the time of the renovation was everyone
including the city aware it was used as a two (2) family home, Mr. Dowd stated yes.
Responding to Mr. Senato’s question whether during that time was any statement made that the
non-conforming use for a two (2) family home in this area had to be a single family home, Mr.
Dowd stated no.
Mrs. Townshend confirmed that it was the case after reviewing the permit applications that were
submitted. It was not readily apparent from the permit applications that it was not a single
family, but the zoning review of the building permit did not pick up on the fact that it was a two
7
Página 9
CITY OF DOVER BOARD OF ADJUSTMENT JANUARY 13, 2016
(2) family dwelling and there was nothing stated in the permits themselves that informed him of
the nonconforming use. This was certainly an error on the part of City Staff.
Responding to Mr. Keller’s question on the definition and process for a vacant structure, is there
any time limitation as to how long that property may remain vacant and undisturbed if the annual
fee is paid, Mrs. Townshend stated no. If properties are not maintained and deteriorated then they
will be taken forward as dangerous buildings to City Council and work towards demolition.
There is no limit on how long a building can remain vacant.
Responding to Mr. Keller’s question regarding the absence of the requirement of this applicant to
bring about a remedy to the foundation problem and could this property have otherwise simply
remained vacant and retained its non-conforming status, Mrs. Townshend stated no, a non-
conforming use expires after one (1) year if it is not utilized. The fact that it was vacant for more
than a year is what caused the expiration.
Responding to Mr. Keller’s question whether he was correct in reading the city’s report that at
the time of the second Building Permit being issued for the work in September 2015 if the
property was vacant at that time for the period to exceed one year, Mrs. Townshend stated yes.
Mr. Keller commented that it would have seemed that something with the history may have
come to light at that time with the issuance of the second permit as to continuing to perhaps try
to renovate the property to its previous condition, but if you did that it could not be a multi-
family at that time.
Mrs. Townshend stated that when she reviewed the notes in the Building Permit it indicated that
the Permit was for the repair of the foundation on a single family dwelling. It does appear that
the city did not research the history of the property to determine that it was not a single family
dwelling at the time. It could have and should have been picked up at that point in time.
Responding to Mr. Hufnal’s question that it was not intentionally over looked as being a multi-
family unit, Mrs. Townshend stated not to her knowledge. She thinks that it was an oversight. It
points out an area where she needs to work with Staff to investigate more in this specific zone
because of the changes in zoning over time.
Mr. Hufnal commented that if you look at some of the multi-family buildings you could get four
(4) units in a single family foundation and he could see the point of that happening.
Responding to Vice Chairman Ericson’s question whether the building was under construction
the entire period even though it was on the weekends, Mr. Dowd stated yes, but nothing from the
exterior. The interior work would not have been noticed readily from the outside.
Mr. Senato had concerns regarding how to proceed if the variance is passed. Would the Board be
setting a precedent in the future, which in his mind would not be very good, but on the other
hand he leans towards approval because there has been a hardship. No irregularities by the City,
but just an overlooked situation.
8
Página 10
CITY OF DOVER BOARD OF ADJUSTMENT JANUARY 13, 2016
Mr. Keller noted that most variance applications received are involved with Area Variance
requests that pertain to matters of geometry, and this application is considered a Use Variance
which has a higher standard to meet that the Board must consider in deliberations. This type of
Use Variance request is one that is applied for where otherwise it would be a matter of a
Rezoning. The RG-1 prohibits the multi-family use. If not for the matter of the series of permits
and the loss of the nonconforming use, the applicant would likely be applying for a Rezoning.
When the Board now considers the possibilities of approving the applicant’s request to return the
property to a nonconforming use they would still have to consider the various standards for a Use
Variance. In order for the applicant to obtain that variance to return the property to a
nonconforming use, the Board would have to find that the property cannot provide a reasonable
return when used only for the permitted use. The applicant would have to justify that he could
not realize a reasonable return on the property after his investment. This would be for a single-
family dwelling sale or rental.
Responding to Mr. Keller’s question of how the applicant could demonstrate that there would not
be a reasonable return on the property after his investment, Mr. Dowd stated that he would have
to contact a realtor to get a market value of the home and compare it to what he has invested. He
reasonably thinks and believes that putting any more money into this property is going to exceed
the market value of it. Homes in that neighborhood are not selling like they are in Sherwood or
other communities around Dover. He does not believe the property would even sell. He did not
like talking without having the background. Tenant and occupy rates are very low in that
neighborhood as well as turnover. He estimates rental income at $5500 to $7000 a year. It would
be roughly $800 a month for a rental of single family home that would consist of three bedrooms
and 1 bath. There would be $200 in expenses from the $800 fee. If you put in $40,000 it would
take lot of years just to break even.
Responding to Vice Chairman Ericson’s clarification that it would not be economically feasible
to invest more money into the property after all that has been spent, and if the applicant tried to
sell the property, it would probably not sell and therefore remain vacant, Mr. Dowd affirmed that
at that point an action of demolition or something would have to come up. When he spoke to
Mrs. Townshend in December regarding the two (2) vacant lots next door to his property and
three (3) lots across the street recently acquired by the City and planned for demolition, he thinks
that revitalization is finally occurring in the neighborhood. A complete revitalization with a
recreation center would drive the property value up and attract better tenants. He has owned the
property so long and felt that he was blindsided and caught in the mix. He wants to do right and
even asked if the city wanted to purchase the property. As an individual it is not reasonable to
think that he would want to invest any more money in a property that does not increase in value,
does not draw the right tenants, and has high turnover rate. Because he is so far into it now; he
has come before the Board to petition to help him maintain the multi-family use.
Responding to Mr. Keller’s question whether the applicant was allowed to proceed with the
renovation, at what point did he expect completion of the requirements as permitted for the
renovations; Mr. Dowd stated that the foundation could be done in three (3) weeks. He could
have tenants in 90 days.
Mr. Dowd stated that a month ago there was an inspection completed of the last three (3) piers
9
Página 11
CITY OF DOVER BOARD OF ADJUSTMENT JANUARY 13, 2016
and was told he could put the floors back together and move forward. “The inspector advised his
contractor to insulate between all the new floor joists and close the floor for completion.” He
could probably leave the meeting today and go the property so that the permit could be closed
out. He informed the contractor at that time to stop work until he was clear on how to move
forward in remodeling this home if it was not cost effective.
Mr. Hufnal asked if the Board of Adjustment reinstated the nonconforming use, could the
applicant have the work done and rented in 90 days, Mr. Dowd stated yes.
Mr. Keller stated that renting the property was dependent upon the economy and they could not
guess if there was an available tenant, but within that period of time or less the applicant could
have the permit approvals and construction complete and available for occupancy.
Mr. Dowd stated that he currently has a mechanical permit for a heating system. He needs to
obtain a plumbing permit because the existing plumbing does not meet the current codes. He will
also need to put the decking back on the floor joist.
Responding to Vice Chairman Ericson comment about the house being very old (100 years old)
he would suspect that the applicant would anticipate a lot more repairs of this nature to keep up
the home, Mr. Dowd stated that in 1990 when he purchased the property and an electrician found
that some of the electric was already upgraded. There is new plumbing. With the foundation
currently done, the only thing that is really required is normal upkeep. A roof is standard and
good for 20 years, and the house has vinyl siding and windows. He has utilized city programs in
the past and currently. He does not foresee any major difficulties with the home.
Vice Chairman Ericson opened the public hearing.
Mrs. Townshend was sworn in by Mr. Rodriguez.
Mrs. Townshend spoke as the Senior Code Enforcement Official. She stated that she did not feel
it was appropriate to speak in her role as City Planner on this matter. One of her roles as Director
of Planning and Community Development is the oversight of the code enforcement program.
Code Enforcement is a big deal in this area. An issue the city continues to struggle with is the
issue of existing rental units that are in marginal condition at best. The Downtown Development
District, within which is where we are really focusing resources, is 84 percent rental. Certainly
the goal is homeownership which was included in the Staff Report. The more information the
Board of Adjustment has, the better the decision that can be made. She was not intending to
speak in favor or against. In dealing with the rental units, especially in older houses, again many
of them are marginal. The frequent approach of a landlord is to slap on some paint, bring the
property to absolute minimum code standards, and the city does not get sustained compliance.
Based on the pictures that the applicant shared and the extent of the foundation renovations this
landlord does not appear to be doing that. As part of the overall strategy of bringing back the
downtown, obviously homeownership is the focus, but improving the quality of rentals is also
important. From a Code Enforcement standpoint and seeing what is going on here, and what is
more frequently seen in terms of what needs to be repaired, these are more sustaining
improvements. The repairs presented today by photo appear to be quality repairs. Quality repairs
10
Página 12
CITY OF DOVER BOARD OF ADJUSTMENT JANUARY 13, 2016
are one of the challenges that we find in our Code Enforcement program.
Responding to Mr. Keller’s question if the variance request for the return of the property to a
nonconforming status was approved and the permit process for the renovations was accepted by
the City within 90 days, but the property remained vacant for a lack of a rental, etc., is there
anything that jeopardizes the property in returning once again to the present state of losing its
nonconforming status, Mrs. Townshend stated that the variance is good for one year.
Mr. Keller commented that it would behoove the applicant to summarily bring closure to the
reconstruction project and the acceptance by the city of the permitting and pursue a tenant
wholeheartedly if in fact there was an approval for the variance requested today. He was inclined
to think that there is uniqueness to the applicant’s application. He follows legal notices every day
in the newspaper and there is publication and proper notice of pending rezonings, and also
publication in the newspaper about what has transpired within Council meetings regarding
rezonings. He did not think that Mr. Dowd’s circumstance is a condition within the
neighborhood that presents itself to the Board of Adjustment on a routine basis. He stated the
facts lean favorably towards an approval as opposed to a denial under use variance standards.
Mr. Keller asked how many properties within the immediate RG-1 zoning area were within full
compliance and single-family use only, and how many were nonconforming properties. Mrs.
Townshend stated that if you go south there is the AT & T property and there is a property
fronting Queen Street with apartments. The block north of that is somewhat of a mix, many are
single family but there are also many vacant properties. This is one of the most challenging
stretches of roads in the city in terms of the challenges faced and the quality of housing stock. It
is a crime hot spot and there are real challenges in the two block area of South New Street. The
city is working in a lot of ways to get their hands around the problems. Mr. Dowd mentioned that
the city has acquired two vacant properties on the west side of the street where his property is
located, but they have also acquired two structures across the street that they are in the process of
moving towards demolition. The Downtown Dover Partnership has purchased one vacant
property on the west side of the street and is preparing to go to closing on a multi-family
property on the east side of the street directly across from this. Again, that will all be demolished
in conjunction with the city properties that are being demolished. There is quite a bit of effort
through Restoring Central Dover, Police Department, Planning Office and Code Enforcement to
really get a handle on the deterioration that they have seen in this neighborhood and start to turn
it around.
Responding to Mr. Senato’s concern of a repercussion after a decision is made, of particular
cases and what it does in the future in the area itself regarding zoning changes, and asked if the
variance was passed today, what impact would it have in the future for other owners that might
hear this and come in front of the Board or bring this up again, Vice Chairman Ericson stated
that if it is the intent of the Board to approve this variance, he thinks that it is critical that all
three (3) Use Variance criteria are addressed in the motion to specify that this is a unique
situation. This application is very different from past cases. He has been a very responsible
owner, but it is very important in the motion to include everything in a Use Variance. Mr.
Rodriquez stated that it sets a precedent, but enough can be put in the motion based on the
testimony heard today to make it an exception so that it is not precedential.
11
Página 13
CITY OF DOVER BOARD OF ADJUSTMENT JANUARY 13, 2016
Chairman closed the public hearing after seeing no one else wishing to speak.
Chairman questioned if there was any additional correspondence for the record. There was
none.
Mr. Keller commented regarding the previous discussion and Mr. Senato’s question whether this
is hypothetical, and if someone was appearing before the Board for a request to convert to a
multi-family or construct a multi-family usage within this zone knowing the current zoning and
not the previous use in the past, he would say that there is no question that it would be denied,
and that there appear to be unique overlapping circumstances with regard to the timing of this
undertaking from a valid permit process and the subsequent delays regarding construction. There
is a bit of uniqueness regarding this specific variance application that the Board would probably
not give any thought to if otherwise it was a variance application simply appearing before the
Board for a single family property that they would want to convert to a multi-family use
property. That in his mind absent any other conditions would be a denial, therefore he is not
fearful of any repercussions or precedent set by this case.
Vice Chairman Ericson stated that he doubted very seriously that we would see someone from
this zoning area that would request to convert from single to multi-family. What the Board has
seen in the past are cases where the property owner has spent very little money on the property,
and testimony of prostitution, drugs, and other problems in the area. This is what we want to
guard against versus an owner not turning the dwelling back into a single-family dwelling
because he does not want to put the money into it, but the building is actually dangerous to the
neighborhood. Ericson said then a person comes forward with the excuse that he was never told.
This is what he fears. Unless the Board really makes a strong motion that this is an unusual case
and vote on it, then we run the chance of having to prove nonsense.
Mr. Senato indicated that due to the legality of the issue and to prevent the potential for people
coming forward for a similar variance, that Mr. Rodriguez craft language for the decision that
summarizes the decision in the proper legal terms.
Mr. Rodriguez stated that he would write the decision for the approval by the Board based upon
the facts heard today which seems to support that this is a unique case and not one that would set
precedent.
Vice Chairman Ericson moved to approve variance V-16-02 based upon the testimony given
whereas the applicant was not informed that within 1 ½ years of reconstruction that he would
lose a nonconformity, and he has spent a considerable amount of money ($25,000) getting it
back to code, and it would cost another $10,000 if he had to convert it to a single-family
dwelling, and the house itself is probably only worth $40,000 or less, that it is not economically
feasible for him to invest this money and the property would probably end up being vacant for a
long period of time or demolished. Variance V-16-02 will reinstate the nonconforming use. The
motion was seconded by Mr. Hufnal and unanimously carried 4-0.
Vice Chairman Ericson further stated that as far as Use Variance is concerned in this case the
condition is particular to this property because the owner has been very responsible and has
12
Página 14
CITY OF DOVER BOARD OF ADJUSTMENT JANUARY 13, 2016
spent a lot of money on the property, and the fact that this is reasonable use to the land, and it is
not practical or economically feasible to return to a single-family dwelling. In his mind if the
applicant was disapproved he would be deprived of all reasonable use of the land. Furthermore,
by saying no, the property would be vacant or destroyed and that would be detrimental to public
welfare. In his mind it would be best to approve this variance.
Mr. Hufnal stated that he agreed with Vice Chairman Ericson comments.
Vice Chairman Ericson and Mr. Hufnal wished the applicant good luck with his property.
Mr. Dowd thanked the city for hearing and approving his case.
Mr. Senato stated that this was an unusual application and he apologized for bringing up the
inspector, as there was no intent of degrading the inspector. One positive thing that came out of
this particular hearing which is definitely unique is the fact that it has opened up some minds
including his. Mrs. Townshend was very correct in stating that Staff will look at how to prevent
similar situations in the future. In the future he is sure that this will be avoided since Staff will be
looking into the procedural process.
Vice Chairman stated that the next meeting will be February 17, 2016.
The meeting was adjourned by acclamation.
Meeting adjourned at 10:28 A.M.
Sincerely,
Maretta Savage-Purnell
Secretary
13
Página 15
City of Dover
Board of Adjustment
February 17, 2016
V-16-01
Location: At and near the southeast corner of West Reed Street and
South Kirkwood Street.
Applicant/Owner: MauTiste Investment Group
Tax Parcels/ (Existing)
Addresses:
420 W Reed St ED-05-076.12-02-65.00-000
105 S Kirkwood St ED-05-076.12-02-64.00-000
107 S Kirkwood St ED-05-076.12-02-63.00-000
Application Date: November 13, 2015
Present Zoning: RG-1 (General Residence Zone)
Present Use: Vacant structure (Reed), vacant lots (Kirkwood)
Proposed Use: 6 dwelling units in 3 duplex/one-family semi-detached structures
on 6 proposed subdivided lots
Reviewed By: Bill Cook, Planner I
Variance Type: Area Variance
Variance Requested: Variance from the requirements of Zoning Ordinance Article 4
§4.2 pertaining to the minimum lot dimensions, minimum
setbacks, and maximum lot coverage for duplex/one-family semi-
detached dwellings in the RG-1 zone.
Página 16
V-16-01 Lands of MauTiste Investment Group
Board of Adjustment Report
Page 2 of 7
Project Description
The applicant is proposing construction of six (6) duplex homes structures on six (6) planned
lots. The existing three (3) lots primarily front on South Kirkwood Street with a total area of
approximately 11,325 SF (0.26 Ac.).
The existing properties are addressed as 420 West Reed Street, featuring a building formerly
known as the Square Club, and 105 and 107 South Kirkwood Street, currently vacant lots.
A Minor Subdivision Plan, in conjunction with a Conditional Use Site Development Plan (C-16-
03) has been filed to create six (6) planned lots with front yards and entrances on West Reed
Street (Exhibit A).
The applicant is requesting an Area Variance from the requirements of Zoning Ordinance Article
4 §4.2 pertaining to the minimum lot dimensions, minimum setbacks, and maximum lot coverage
for duplex/one-family semi-detached dwellings in RG-1.
Zoning and Adjacent Land Uses
A Zoning Map exhibit (Exhibit B) prepared by staff is attached to this report showing the zoning
and parcel locations. An additional Aerial Exhibit Map (Exhibit C) showing the existing lots is
provided for additional orientation. The subject properties are zoned RG-1 (General Residence
Zone), and are located at and near the southeast corner of West Reed Street and South Kirkwood
Street.
Immediately surrounding properties are zoned RG-1 and C-2A (Limited Central Commercial
Zone). The properties north and south of the subject properties are zoned RG-1 and are existing
residential structures. There are some vacant former residential lots located on the blocks north
and south of Reed Street. Diagonally across the intersection to the northwest is a church. Several
properties under common ownership are located west/southwest of South Kirkwood Street across
from the subject properties.
While not shown on the exhibit maps, the subject properties are located within the boundaries of
the city’s Downtown Development District, making a variety of incentives available for
construction projects that promote investment within the district. They are also within the
Restoring Central Dover study area. Both Restoring Central Dover and the Downtown
Development District designations place a priority on improving housing stock and increasing
home ownership. This project has received a large-project grant reserve through the Downtown
Development District program.
Code References
The proposed use as duplex/one-family semi-detached dwellings is permitted as a Conditional
Use subject to Planning Commission approval in the RG-1 zone as outlined in Zoning Ordinance
Article 3 §2.4.b. Note that recent Zoning Ordinance amendments (Ordinance #2015-13, adopted
October 12, 2015) made townhouses and duplexes permitted dwelling types in the RG-1 and
RG-2 zones, subject to Conditional Use approval and specific restrictions. Guidelines for infill
development were also included in the amendments to direct the design of driveways and access,
façade orientation, sidewalks and landscaping.
Página 17
V-16-01 Lands of MauTiste Investment Group
Board of Adjustment Report
Page 3 of 7
Zoning Ordinance Article 4 §4.2 lists the bulk and area standards for lots in RG-1 and
duplex/one-family semi-detached dwellings.
Table 1 summarizes the requirements for such structures in RG-1. In the same table, the
proposed lot dimensions and criteria are shown for each of the six (6) proposed lots. Refer also to
the Subdivision and Site Plan provided by the applicant. (Exhibit A).
Table 1: Zoning Requirements and Requested Bulk Standards
Z-16-01 Lands of MauTiste Investment Group
RG-1 (General Residence Zone)
For All Permitted Uses:
Duplex/One-Family Semi-Detached Dwellings
Minimum Required: REQUIRED REQUESTED [1]
P6 P5 P4 P3 P2 P1
Lot area (sq. ft.) 5,000 1,446 1,399 1,396 1,394 1,391 1,949
Lot width (ft.)
25 23 23 23 23 23 32
per dwelling unit (DU)
Lot depth (ft.) 100 59 59 59 59 59 58
Front yard (ft.) 15 6 6 6 6 6 6, 11.5
Side yard (ft.) 10 3.17 2.5 2.5 2.5 2.5 [2]
Rear yard (ft.) 30 25 25 25 25 25 25
Off-street parking
1 1 1 1 1 1 1
spaces/DU
Maximum Permitted:
Building height
Stories 2½ 2 2 2 2 2 2
Feet 35 -- -- -- -- -- --
Lot Coverage 50% 64% 66% 67% 67% 67% 48%
Notes:
[1] Criteria requiring variance are in italics .
Exceptional Practical Difficulties Tests
Zoning Ordinance Article 9 §2 dictates the specific powers and duties of the Board of
Adjustment with regard to granting variances. Specifically the Board must determine:
2.1 Variance – The board shall have the authority to authorize variances from provisions of the Zoning
Ordinance that are not contrary to public interest where the board determines that a literal interpretation
of the Zoning Ordinance would result in undue hardship or exceptional practical difficulties to the
applicant. In granting variances, the board shall determine that the spirit of the Zoning Ordinance is
observed and substantial justice is done.
2.11 Area Variance. A variance shall be considered an area variance if it relates to bulk standards,
signage regulations, and other provisions of the Zoning Ordinance that address lot layout, buffers, and
Página 18
V-16-01 Lands of MauTiste Investment Group
Board of Adjustment Report
Page 4 of 7
dimensions. In considering a request for an area variance, the board shall evaluate the following criteria
and document them in their findings of fact:
(a) the nature of the zone in which the property lies;
(b) the character of the immediate vicinity and the contained uses therein;
(c) whether, if the restriction upon the applicant’s property were removed, such removal would
seriously affect neighboring properties and uses; and
(d) whether, if the restriction is not removed, the restriction would create unnecessary hardship or
exceptional practical difficulty for the owner in his efforts to make normal improvements in the
character of that use of the property that is a permitted use under the provisions of the Zoning
Ordinance.
Review of Application
As part of the application, the applicant was asked to summarize how the requested variance
relates to the criteria. The applicant’s response is provided below along with a staff assessment
of the application in accordance with the required criteria.
1. The nature of the zone in which the property lies.
Applicant Responses:
“The zoning of the prosed project is RG-1 Residential. In general, there is a variation of
older single-family homes, duplex units single story modular units and row homes.”
Staff Response:
The RG-1 zoning district is found in older parts of central Dover and often encompasses
properties that existed before zoning was enacted. Housing types found in RG-1 may
include single-family detached dwellings, duplexes, and legal non-conforming apartment
conversions of former one-family dwellings and other apartment buildings. It is common
within RG-1 for a variety of legal non-conforming conditions to be present related to lot
area, setbacks, lot coverage, and other issues.
2. The character of the immediate vicinity and the contained uses therein.
Applicant Responses:
“There are several abandoned buildings in the area. Across the street and directly behind
the proposed site are two such buildings. These abandoned buildings are attracting a fair
amount of loitering. The most glaring variation in building structure is the dilapidated
abandoned building; formally know as the Square Club, on the proposed site. This
building has been vacant for several months and has been repeatedly vandalized. It
continues to be a safety hazard to the surrounding neighbors. There is also some light
commercial zoning near the proposed site. Many of the homes in the area are abandoned
and boarded up or in need of repair.”
Staff Response:
Staff concurs with the applicant’s description, further noting that vacant lots are scattered
throughout the surrounding blocks. On the west side of the next block north on Kirkwood
Página 19
V-16-01 Lands of MauTiste Investment Group
Board of Adjustment Report
Page 5 of 7
Street, three (3) new detached homes have been built by Central Delaware Habitat for
Humanity, with two (2) additional homes planned.
Photographs provided by the applicant of the immediate surroundings are provided in
Exhibit D.
3. Whether, if the restriction upon the applicant’s property were removed, such removal
would seriously affect neighboring properties and uses.
Applicant Responses:
“If the restrictions are removed from the proposed site, we plan to immediately demolish
the Square Club. This alone will improve the appearance and security of the area. Next,
we plan to build three duplexed houses- 6 homes for sale. (See enclosed sketch plan and
proposed front elevation picture.) These homes will significantly improve the general
appearance of Reed and Kirkwood Streets and continue the improvements Habitat For
Humanity has started one block away. Through home ownership, this project will attract
tax paying citizens who are motivated to maintain their homes and keep the area safe and
clean.”
Staff Response:
420 W. Reed Street (former Square Club) is among properties listed on the city’s
Dangerous Buildings List.
Staff notes for information the five (5) lots (20,28,30,32 and 40 S. Kirkwood St.)
referenced to Central Delaware Habitat for Humanity. Of these, numbers 28 and 32 were
constructed and sold to homeowners. 40 S. Kirkwood has been constructed and issued a
Certificate of Occupancy according to Building Permit records, and 30 S. Kirkwood has
been issued a Building Permit for construction.
Staff concurs that new construction would improve the appearance of the area and
expand opportunities for home ownership and improved housing conditions near the
downtown area. A architectural rendering of the proposed duplex house plan is found in
Exhibit D: Page 4.
4. Whether, if the restriction is not removed, the restriction would create unnecessary
hardship or exceptional practical difficulty for the owner in his efforts to make normal
improvements in the character of that use of the property that is a permitted use under the
provisions of the Zoning Ordinance.
Applicant Responses:
“If the restrictions are not removed, the RG-1 code does not permit MauTiste a
reasonable development option. The option below is less conforming and would require
more significant code restrictions to be removed. In addition, this option would not
enhance the landscape of the neighborhood.
Página 20
V-16-01 Lands of MauTiste Investment Group
Board of Adjustment Report
Page 6 of 7
1) Renovate the Square Club into four rental apartments. Reconfiguring the
repurposing the building would be the most feasible alternative. The existing
structure is sound and large enough to accommodate four (4) 1-bedroom
apartments.”
Staff Response:
Zoning Ordinance Article 3 §2 lists permitted uses in the RG-1 and RG-2 zones. Multiple
dwellings (i.e. apartment buildings) are not a permitted use in RG-1. Conversion of the
existing structure to an apartment building would require a Use Variance which has a
high criteria upon which it is judged compared to an Area Variance.
Staff additionally notes there are other permitted uses the existing structure could be used
for which would be Conditional Uses requiring Planning Commission approval, but Staff
cannot comment regarding the feasibility of such uses economically, or in terms of the
physical improvements that would be required to the structure to carry out such uses.
Staff concurs that new housing would be an enhancement to the surrounding
neighborhood and represents a development option that is likely more compatible than
improving the existing structure.
Staff notes that while the proposed setbacks and other lot criteria are significantly
reduced when compared to existing code, the result of the planned construction would be
similar to historic building patterns when dwellings were commonly built close together
and close to the street.
Variance Recommendations:
Staff recommends approval of the variances:
• The proposed variances would not be out of character for the zone and the surrounding
uses.
• The removal of the existing blighted building is in the best interest of the surrounding
area.
• The proposed construction would bring the properties into closer conformity with the
zone and the uses in the surrounding area and would be compatible with City objectives
related to redevelopment, home ownership, and improved housing conditions.
Advisory Comments to the Applicant:
• If granted, variances become null and void if work has not commenced within one (1)
year of the date the variance was granted. At present there is no provision for extension.
• Improvements to the properties are subject to Site Development Plan, Conditional Use,
and Minor Subdivision approval processes and appropriate permits from the City of
Dover Department of Planning & Inspections and other agencies.
Página 21
V-16-01 Lands of MauTiste Investment Group
Board of Adjustment Report
APPENDIX/ATTACHMENTS
GUIDE TO ATTACHMENTS
Exhibit Description/Author # Pages
A Subdivision and Site Plan, 11” x 17” 1
(Applicant)
B Zoning Map Exhibit 1
(Staff)
C Aerial Exhibit Map 1
(Staff)
D Applicant Criteria Responses, Photographs 8
(Applicant)
Página 22
EXHIBIT A
N
W E
S
SURVEYING
LAND PLANNING
P.O. Box 246
Harbeson, DE 19951
(302) 684-2980
fax (302) 684-2983
cpallc@comcast.net
Subdivision and Site Plan
NOTES
420 Reed Street
1. Tax Map Number: ED-05-076.12-64.00-000
City of Dover, Kent County
ED -05-076.12-02-63.00-000
ED-05076.12-02-65.00-000
2. Current Zoning: RG-1
Delaware
3. Deed Reference: Book 7841 Page 132
Project:
OWNERS CERTIFICATE SURVEYOR'S CERTIFICATION
I Michael Maulpin hereby certify that I am the owner of the I Peter E. Loewenstein hereby certify that I am a Date:
property described and shown on this plan, that the plan registered Surveyor in the State of Delaware, that the
was made at my direction, that I acknowledge the same to information shown hereon has been prepared under
2/01/2016
be my act and desire the plan to be developed as shown my supervision and to the best of my knowledge and
in accordance with all applicable laws and regulations. Project #:
5. Utility easements and locations are not shown. (Not Provided) represnts good surveying practices as required by the
Mautiste Investment Group appliciable laws of the State of Delaware. 151209
6. This plan does not verify the existence of rights of way and/or 644 Merchant Street
easements crossing subject property. (Not Provided) Coatesville, PA 19320 ________________________________________ Scale:
Peter E. Loewenstein, Delaware PLS 389 as noted
7. Survey information shown was taken from a class "B"survey Compass Point Associates, LLC
prepared by Douglas J. Annand dated 2/15/2015 and revised By:____________________________________(Seal) P.O. Box 246
3/18/2015, and to be field verified, by Compass Point Michael Maulpin Harbeson, DE 19951 Sheet 1 of 1
Associates LLC.
Página 23
City of Dover EXHIBIT B
Application No.: V-16-01
Department of Planning & Inspections
New
St
RG-1
C-2A
RG-1
Kirkw
RG-1 ood
t
Wes
St
St
C-3
RG-1
C-3 d St
Ree Site
IO
RG-1
en
Que
C-2A
St
C-2
For
est
St C-2
C-2
ilr
C-3 Ra
oa d
Ave IO
St
rman C-2
a Loock e
Jerus
C-2
ay
lem W
IO
RG-1
Title: Lands of MauTiste Investment Group
Address: 420 W Reed St, 105 & 107 S Kirkwood St Legend
Parcel ID: ED-05-076.12-02-65.00-000
ED-05-076.12-02-64.00-000, ED-05-076.12-02-63.00-000 Dover Parcels
Zoning: RG-1 Zoning
Owner: MauTiste Investment Group
Historic District
Date: 12/29/2015
SWPOZ Tier 3
« 0 100 200 400 Feet
2012 Buildings
Página 24
City of Dover
EXHIBIT C
Application No.: V-16-01
Department of Planning & Inspections
d St
Ree
t
Wes en
Que
St
St
o
Kirkw
t
od S
For
est
ilro St
Ra
Av e
ad
Jerusalem Way n St CNES/Airbus
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,
kerma
DS, USDA, USGS, AEX, Getmapping, Aerogrid, LoocIGN, IGP, swisstopo, and
the GIS User Community
Title: Lands of MauTiste Investment Group
Address: 420 W Reed St, 105 & 107 S Kirkwood St
Parcel ID: ED-05-076.12-02-65.00-000
ED-05-076.12-02-64.00-000, ED-05-076.12-02-63.00-000
Zoning: RG-1
Owner: MauTiste Investment Group
Date: 1/6/2016
Legend
« 0 75 150 300 Feet
Dover Parcels
Página 25
EXHIBIT D: Page 1/8
420
Reed
St.
BOA
Application
1. The
nature
of
the
zone
in
which
the
property
lies;
In
the
zoning
of
the
prosed
project
is
RG-‐1
Residential.
In
general,
there
is
a
variation
of
older
single-‐family
homes,
duplex
units
single
story
modular
units
and
row
houses.
2. The
character
of
the
immediate
vicinity
and
the
contained
uses
therein;
There
are
several
abandoned
buildings
in
the
area.
Across
the
street
and
directly
behind
the
proposed
site
are
two
such
buildings.
These
abandoned
buildings
are
attracting
a
fair
amount
of
loitering.
The
most
glaring
variation
in
building
structure
is
the
dilapidated
abandoned
building;
formally
know
as
the
Square
Club,
on
the
proposed
site.
This
building
has
been
vacant
for
several
months
and
has
been
repeatedly
vandalized.
It
continues
to
be
a
safety
hazard
to
the
surrounding
neighbors.
There
is
some
light
commercial
near
tot
the
proposed
site.
Most
of
the
homes
in
the
area
are
abandoned
and
boarded
up
or
in
need
of
repair.
3. Whether,
if
the
restriction
upon
the
applicant’s
property
were
removed,
such
removal
would
seriously
affect
neighboring
properties
and
uses;
and
If
the
restrictions
are
removed
from
the
proposed
site,
we
plan
to
immediately
demolish
the
Square
Club.
This
alone
will
improve
the
appearance
and
security
of
the
area.
Next
we
plan
to
build
three
duplexed
houses-‐
6
homes
for
sale.
(See
enclosed
sketch
plan
and
proposed
front
elevation
picture.)
These
homes
will
significantly
improve
general
appearance
of
Reed
and
Kirkwood
Streets
and
continue
the
improvements
Habitat
For
Humanity
has
started
one
block
away.
Through
home
ownership,
this
project
Página 26
EXHIBIT D: Page 2/8
will
attract
tax-‐paying
citizens
who
are
motivated
to
maintain
their
homes
and
keep
the
area
safe
and
clean.
4. Whether,
if
the
restriction
is
not
removed,
the
restriction
would
create
unnecessary
hardship
or
exceptional
practical
difficulty
for
the
owner
in
his
efforts
to
make
normal
improvements
in
the
character
of
that
use
of
the
property
that
is
permitted
uses
under
the
provisions
of
the
zoning
ordinance.
If
the
restrictions
are
not
removed,
the
RG-‐1
code
does
not
permit
MauTiste
a
reasonable
development
option.
The
option
below
is
less
conforming
and
would
require
more
significant
code
restrictions
to
be
removed.
In
addition,
this
option
would
not
enhance
the
landscape
of
the
neighborhood.
.
1) Renovate
the
Square
Club
into
four
rental
apartments.
Reconfiguring
and
repurposing
the
building
would
be
the
most
feasible
alternative.
The
existing
structure
is
sound
and
large
enough
to
accommodate
4-‐
1-‐bedroom
apartments.
Página 27
STAFF NOTE: Please disregard table and refer to EXHIBIT D: Page 3/8
Table 1 on Page 3 of the report.
Duplex
Variance
Comments
Semi-‐ Requested
Detached
Minimum
Requirement
Lot
Area
sq.
5000
1399-‐1949
ft.
Lot
Width
25
ft.
23
Lot
Depth
100
59
Front
Yard
15
6
Increase
existing
setback
Side
Yard
10
2.5
Keep
Left
side
existing
Rear
Yard
30
25
Off
Street
1
1
No
variance
required
Parking
Maximum
Permitted
Building
Height
Stories
2.5
2
No
variance
required
Feet
35
No
variance
required
Lot
Coverage
50%
68%
STAFF NOTE: Please disregard table and refer to
Table 1 on Page 3 of the report.
Página 28
EXHIBIT D: Page 4/8
••
•••••
•
••••
--------
..
-----
----
Página 29
EXHIBIT D: Page 5/8
420
Reed
Street
Front
Existing
4’
Front
Setback
Existing
0’
Setback
Página 30
EXHIBIT D: Page 6/8
Rear
Setback
Approximate
rear
Property
line
Reed
St.
Side
yard
eeee
20’ft
20
‘
Página 31
EXHIBIT D: Page 7/8
Across
from
420
Reed
Street
Página 32
EXHIBIT D: Page 8/8
Existing
Homes
Kirkwood
9’
16’