1. Annual Engineering Consultant's Report on the Operation and Maintenance of the
Electric System - Fiscal Year 2012
(Staff Recommends Acceptance of the Report)
2. Adjournment by 5:25 p.m.
/tm
S:\AGENDAS-MINUTES-PACKETS\Committee-Agendas\2013\04-22-2013 UTILITY.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO
INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Página 2
Annual Engineering Consultant’s Report
on the
Operation and Maintenance
of the Electric System
Fiscal Year 2012
Electric Division
City of Dover, Delaware
Página 3
Annual Engineering Consultant’s Report
on the Operation and Maintenance
of the Electric System
Fiscal Year 2012
Prepared for the
Electric Division
City of Dover, Delaware
April 2013
Project No. 72167
Prepared by
Burns & McDonnell Engineering Company, Inc.
Kansas City, Missouri
COPYRIGHT © 2013 BURNS & McDONNELL ENGINEERING COMPANY, INC.
Página 4
April 17, 2013
Ms. Donna S. Mitchell, CPA
Controller/Treasurer
City of Dover
5 East Reed Street
Weyandt Hall, Suite 300
Dover, Delaware 19901
City of Dover
Annual Engineering Consultant’s Report
Project No. 72167
Dear Ms. Mitchell:
In compliance with the requirements of Section 705 and Section 504 of the City of Dover,
Delaware Resolution Authorizing and Securing Electric Revenue Bonds, adopted December 23,
1985 (Resolution), Burns & McDonnell submits this Annual Engineering Consultant’s Report
for the fiscal year ended June 30, 2012. This report summarizes our review and assessment of
the City of Dover’s (City) Electric System, its existing retail electric rates, its insurance coverage
in effect, and its reserve funds. Financial, statistical, and operating data used in preparing the
report were initially reported in the City’s annual financial statements and accounting records.
Additional information was furnished by City and Electric Division staff.
In the preparation of this Engineering Consultant’s Report, Burns & McDonnell completed
assessments of the electric generating stations and the transmission and distribution system of the
City’s Electric Division. Assessments involved interviews, observations, and review of fiscal
year 2012 expenditures and fiscal year 2013 budgets. In addition, an analysis of the balances of
the Improvement and Extension Fund as well as other funds benefiting the Electric Division was
performed. Burns & McDonnell also reviewed the adequacy of the revenues provided by the
current retail rates in relation to the requirements of the Resolution. Finally, a high-level
assessment of the City’s insurance coverage related to the Electric Division was completed.
Based on these reviews and assessments, it is the opinion of Burns & McDonnell that the
Electric System is being operated and maintained, including replacements and upgrades as
appropriate, in a manner that is consistent with current electric utility practices. In addition, the
current retail rates have provided sufficient revenues to satisfy the debt service coverage
requirement in the Resolution.
Further, it is the opinion of Burns & McDonnell that the balances in the various reserve funds
maintained by the City for the Electric Division are sufficient for their intended purposes.
9400 Ward Parkway • Kansas City, MO 64114-3319
Tel: 816 333-9400 • Fax: 816 333-3690 • www.burnsmcd.com
Página 5
We appreciate the cooperation and assistance provided by the City and the Electric Division staff
in the preparation of this report. We will be happy to discuss the report with you at your
convenience.
Sincerely,
BURNS & McDONNELL
Ted J. Kelly
Principal & Senior Project Manager
Business & Technology Services
TJK
Página 6
2012 Engineering Consultant’s Report Table of Contents
TABLE OF CONTENTS
Page No.
SECTION 1 – EXECUTIVE SUMMARY
Introduction ........................................................................................................................ 1-1
Electric System Overview and Assessment ....................................................................... 1-1
Financial Assessment ......................................................................................................... 1-4
Conclusions ........................................................................................................................ 1-6
SECTION 2 – INTRODUCTION
Purpose of Report .............................................................................................................. 2-1
Organization....................................................................................................................... 2-2
SECTION 3 – ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT
Electric System Overview.................................................................................................. 3-1
Production Plant ........................................................................................................... 3-3
Transmission and Distribution Plant ............................................................................ 3-3
General Plant ................................................................................................................ 3-4
Electric System Assessment .............................................................................................. 3-4
Electric Generating Stations ......................................................................................... 3-4
Description .............................................................................................................. 3-4
Management and Organization................................................................................ 3-5
Major Equipment Operation and Maintenance ....................................................... 3-6
Electric Generation Improvements .......................................................................... 3-8
Condition Assessment ............................................................................................. 3-9
Transmission and Distribution Systems ....................................................................... 3-14
Safety ....................................................................................................................... 3-14
System Reliability ................................................................................................... 3-14
Power Quality .......................................................................................................... 3-14
Operations and Maintenance ................................................................................... 3-15
Design Standards and Specifications....................................................................... 3-16
Transmission and Distribution Capital Improvements ............................................ 3-16
Condition Assessment ............................................................................................. 3-17
Conclusions .................................................................................................................. 3-18
SECTION 4 – FINANCIAL ASSESSMENT
Financial Results ................................................................................................................ 4-1
Required Revenue Level............................................................................................... 4-1
Electric Rates ................................................................................................................ 4-2
Operating Results.......................................................................................................... 4-2
Adequacy of Electric Rates .......................................................................................... 4-7
Status of Revenue Bonds ................................................................................................... 4-8
Insurance ............................................................................................................................ 4-9
Operating and Reserve Accounts ....................................................................................... 4-9
Electric Revenue Fund.................................................................................................. 4-13
Electric Improvement and Extension Fund .................................................................. 4-14
SECTION 5 – CONCLUSIONS
City of Dover, Delaware TOC-1 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 7
2012 Engineering Consultant’s Report Table of Contents
LIST OF TABLES
Table No. Page No.
III-1 Year-End Plant in Service .................................................................................. 3-1
III-2 Fiscal Year 2013 Planned Capital Expenditures ................................................ 3-2
III-3 Fiscal Year 2012 Operating Statistics ................................................................ 3-7
IV-1 Annual Sales and Customers .............................................................................. 4-3
IV-2 Annual Revenues and Sales Ratios .................................................................... 4-4
IV-3 Net Revenue Margins and Unaccounted For Energy......................................... 4-5
IV-4 Comparative Statement of Revenues, Expenses, and Changes in Unreserved
Retained Earnings .............................................................................................. 4-6
IV-5 Debt Service Coverage Calculation ................................................................... 4-7
IV-6 Debt Service Schedule of Electric Revenue Bonds ........................................... 4-9
IV-7 Schedule of Insurance Coverage in Effect ......................................................... 4-11
IV-8 Schedule of Insurance Coverage in Effect ......................................................... 4-12
IV-9 Reserve Account Activity and Balances ............................................................ 4-15
City of Dover, Delaware TOC-2 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 8
2012 Engineering Consultant’s Report Table of Contents
LIST OF FIGURES
Figure No. Page No.
II-1 Organization ....................................................................................................... 2-3
II-2 Administration ................................................................................................... 2-3
II-3 Electric Engineering ........................................................................................... 2-3
II-4 Electric Transmission & Distribution ................................................................ 2-4
*****
City of Dover, Delaware TOC-3 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 9
SECTION 1 - EXECUTIVE SUMMARY
Página 10
2012 Engineering Consultant’s Report 1.0 - Executive Summary
1.0 EXECUTIVE SUMMARY
1.1 INTRODUCTION
The 2012 Annual Engineering Consultant’s Report (Report) has been prepared in compliance
with the requirements of the City of Dover, Delaware Resolution Authorizing and Securing
Electric Revenue Bonds, adopted December 23, 1985 (Resolution). Burns & McDonnell has
been retained as Engineering Consultant by the City of Dover, Delaware (City) to complete an
inspection of the Electric System and prepare a report on findings.
The Resolution requires that the Engineering Consultant complete the following:
“The City covenants that it will cause the Engineering Consultants employed under the
provisions of Section 705 of this Resolution . . . to make an inspection of the Electric
System at least once each fiscal year and . . . to submit to the City Manager a report
setting forth (a) their findings whether the properties of the Electric System have been
maintained in good repair, working order and condition and whether they have been
operated efficiently and economically and (b) their recommendation as to
(i) the proper maintenance, repair and condition of the Electric System during the
ensuing fiscal year and an estimate of the appropriations which should be made for
such purposes,
(ii) the insurance to be carried under the provisions of Article VII of this Resolution,
(iii)the amount that should be deposited during the ensuing fiscal year to the credit of the
Improvement and Extension Fund for the purposes set forth in Section 510 of this
Article,
(iv) the extensions, improvements, renewals and replacements which should be made
during the ensuing fiscal year, and
(v) any necessary or advisable revisions of the electric rates.”
This is the tenth annual Engineering Consultant’s Report prepared for the City by Burns &
McDonnell.
1.2 ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT
The Electric System owned by the City primarily consists of production plant, transmission
plant, distribution plant, and general plant facilities.
City of Dover, Delaware 1-1 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 11
2012 Engineering Consultant’s Report 1.0 - Executive Summary
The City owns two power plants, the McKee Run Generating Station (McKee Run) and the
VanSant Generating Station (VanSant). McKee Run consists of three steam turbine generating
units with a total combined capacity of 136 megawatts (MW). VanSant is a 39 MW simple-cycle
combustion turbine unit.
Effective July 1, 2011, the City entered into an Energy Management Agreement with The Energy
Authority, Inc. (TEA) to assist the City with its energy procurement, energy sale, purchase of
fuels, establishment and management of risk policies, and the development and management of
hedging protocols and related energy procurement challenges. Headquartered in Jacksonville,
Florida, TEA is a non-profit energy manager owned by seven public utility systems operating
across the nation.
North American Energy Services Corporation (NAES Corporation) operates the generating
plants. The agreement between the City and NAES Corporation has been in effect since July 1,
2006. The Engineering Consultant’s observations regarding the generating stations and units are
described in the Electric System Overview and Assessment section of the Report.
The Electric Division served approximately 22,953 customers at the end of FY 2012, 19,804 of
which were residential customers. The distribution facilities include 190 miles of overhead lines
and 268 miles of underground lines connected through fifteen substations. The Engineering
Consultant’s observations regarding the transmission and distribution systems are described in
the Electric System Overview and Assessment section of the Report.
Four of the Electric Division customers take service off of the 69 kV transmission system. These
customers include the Dover Air Force Base, Kraft, Proctor & Gamble, and NRG Energy Center
(NRG). NRG is an exempt wholesale generator that sells power that must be transmitted through
the City’s transmission system to third party purchasers. When the NRG plant is not operational,
the Electric Division provides power for the plant site.
City of Dover, Delaware 1-2 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 12
2012 Engineering Consultant’s Report 1.0 - Executive Summary
The Electric Division has one contract for providing transmission service through the Electric
System. As previously stated, the Electric Division provides transmission service to NRG for the
output of its 16-MW electric generator.
General plant facilities consist primarily of Electric Division administrative and operations
facilities and pollution control related equipment on McKee Run and VanSant. Other types of
general plant include office furniture and equipment, transportation and power-operated
equipment, and communication equipment.
The various systems and components of the generating stations reviewed by the Engineering
Consultant are listed below:
Major Equipment Management and Organization
• Steam turbines/generators • Safety
• Boilers and auxiliaries • Training
• Station cooling water systems • Staffing
• Fuel handling systems
• Water treatment systems
• Station electrical systems
• Station control systems
• General facilities
Based on statements and information provided by the City, as well as the observations and
reviews performed, it is the Engineering Consultant’s opinion that the City’s power generation
facilities are being operated and maintained consistent with generally accepted electric utility
practice in the United States. In general, the performance, operation, maintenance, staff,
planning, and training aspects for the McKee Run and VanSant were found to be above average.
Specifically, the generation facilities have demonstrated a high level of availability despite the
dispatching of the units primarily for peak demand.
The Engineering Consultant’s observations regarding the generating stations and units are
described in the Electric System Overview and Assessment section of the Report. The following
list includes areas of the transmission and distribution system that were considered and reviewed.
City of Dover, Delaware 1-3 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 13
2012 Engineering Consultant’s Report 1.0 - Executive Summary
• System reliability
• Power quality
• Operations and maintenance
• Design standards and specifications
• Transmission and distribution improvements
It is the Engineering Consultant’s opinion that the design, construction, operation, and
maintenance of the City’s electric transmission and distribution system and the associated
facilities are consistent with current generally accepted electric utility standards. In recent years,
the City has made appropriate upgrades and improvements which the Engineering Consultant has
observed while conducting the reviews and assessments to complete the annual reports.
The Engineering Consultant’s observations regarding the transmission and distribution systems
are described in the Electric System Overview and Assessment section of the Report.
1.3 FINANCIAL ASSESSMENT
The level of revenues required from the retail electric rates for the Electric Division were
determined through the analysis of the financial results and net income or net margins for FY
2012. The Resolution requires that the Electric Division maintain a debt service coverage ratio of
1.25. Following is an excerpt from Section 502(c) of the Resolution.
“(c) The total amount of the Revenues of the Electric System during the preceding
fiscal year shall have been not less than the total of the following:
(1) The Current Expenses of the Electric System during the current fiscal years shown by
the Annual Budget . . . for such fiscal year, and
(2) One hundred twenty-five percent (125%) of the maximum amount of the Principal
and Interest Requirements for any fiscal year thereafter on account of all bonds then
Outstanding under the provisions of this Resolution.”
Customers of the Electric Division of the City were charged for the electric service they received
based on the City’s rate schedules and contracts that were in place in FY 2012. A comprehensive
cost-of-service and rate design study was completed in 2006 and subsequent rate analyses were
completed in 2007, 2008, and 2012 to examine revenue requirements and revenue generation.
City of Dover, Delaware 1-4 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 14
2012 Engineering Consultant’s Report 1.0 - Executive Summary
Specifically, the 2006 rate study was conducted to address increased costs associated with a new
power supply contract that became effective on July 1, 2006. The rate study recommended
combining a number of rate classes and implementing rate increases on July 1, 2006. The 2006
rate study also recommended an additional increase be implemented on January 1, 2007 to cover
increased costs associated with operating the generating station. The 2007 and 2008 rate analyses
re-examined Electric Division revenues and expenses and recognized additional revisions to
power supply costs. As a result of these analyses, additional rate increases were implemented on
July 1, 2007 and July 1, 2008. The July 2012 rate adjustments established the rate schedules
utilized by the Electric Division today.
Total energy sales decreased from 734.1 GWh in FY 2011 to 710.3 GWh in FY 2012, a decrease
of 3.2 percent. Total revenue from sales to electric customers in FY 2012 was approximately
$91.9 million, representing a decrease of $7.6 million from FY 2011 rate revenue of
approximately $99.5 million. In FY 2012, the average revenue per kWh for residential customers
was 14.29 cents and the system-wide average price was 12.94 cents per kWh.
The Electric Division’s largest cost in providing electric service to its customers is the wholesale
cost of power purchased from the Pennsylvania New Jersey Maryland Interconnection (PJM)
marketplace by its energy manager, TEA. From FY 2011 to FY 2012, the cost of power
decreased from $69.6 million to $58.9 million. Net income increased from $3.2 million in FY
2011 to $8.5 million in FY 2012. The net income increase in FY 2012 was due in large part to
the decrease in power supply and generation costs.
The Resolution requires that annual revenues of the Electric Division be no less than the total
current expenses plus 125 percent of the greatest remaining annual debt service. The Electric
Division achieved debt service coverage ratios for FY 2010, FY 2011, and FY 2012 of 4.24,
5.45, and 6.48 respectively; therefore, the revenues generated by the current electric rates have
been sufficient to meet the applicable covenant of the Resolution.
The City maintains a comprehensive insurance program to insure against varying types of
liabilities, as well as significant losses related to various Electric Division properties. It is the
City of Dover, Delaware 1-5 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 15
2012 Engineering Consultant’s Report 1.0 - Executive Summary
opinion of Burns & McDonnell as Engineering Consultant, and not as insurance counselor, the
insurance in full force and affect appears to satisfy the requirements of Section 706 of the
Resolution.
The City established the Electric Revenue Fund and the Electric Improvement & Extension
(I&E) Fund to make moneys available for specific purposes when they are needed. The
following is a list of these funds’ respective cash accounts:
Electric Revenue Fund
• Insurance Reserve Account
• Contingency Reserve Account
• Electric Rate Stabilization Reserve Account
• Interest and Sinking Account
Electric Improvement and Extension Fund
• Depreciation Reserve Account
• Future Capacity Reserve Account
The Engineering Consultant reviewed information on the accounts listed above and found that
the balances in those accounts as of June 30, 2012, were consistent with the required or target
balances.
1.4 CONCLUSIONS
Based on the reviews and assessments completed, it is the opinion of Burns & McDonnell that:
1. The City’s power generation facilities are being operated and maintained consistent with
generally accepted electric utility practice in the United States.
2. The design, construction, operation, and maintenance of the City’s electric transmission and
distribution system and the associated facilities are consistent with current generally accepted
electric utility standards and over the past few years, the system has been upgraded in order
to improve operation and service to customers.
3. The Electric Division capital projects included in the City’s Capital Investment Plan and the
FY 2013 Operating Budget are necessary and should provide improved reliability and power
quality for the Electric System.
City of Dover, Delaware 1-6 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 16
2012 Engineering Consultant’s Report 1.0 - Executive Summary
4. The balances as of June 30, 2012 for the various reserve funds maintained by the City for the
Electric Division appear to be sufficient for their defined purposes.
5. The insurance coverage in full force and effect as maintained by the City related to the
various assets of the Electric Division appears to satisfy the requirements of Section 706 of
the Resolution.
6. The electric revenues generated by the City’s current retail rates are more than sufficient to
fulfill the debt service coverage requirement (125 percent of current expenses) defined in
Section 502(c) of the Resolution.
*****
City of Dover, Delaware 1-7 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 17
SECTION 2 - INTRODUCTION
Página 18
2012 Engineering Consultant’s Report 2.0 – Introduction
2.0 INTRODUCTION
The City of Dover, Delaware (City) operates a municipally-owned electric utility system that
serves 22,953 customers within the City and surrounding areas at the end of FY 2012. The
service area of the electric utility is located in central Delaware, with the City itself located
approximately 70 miles south of Philadelphia, Pennsylvania.
2.1 PURPOSE OF REPORT
This 2012 Annual Engineering Consultant’s Report (Report) has been prepared in compliance
with the requirements adopted December 23, 1985 of the City of Dover Electric Bond Resolution
(Resolution). Burns & McDonnell has been retained by the City as the Engineering Consultant
defined in Section 705 of the Resolution, as follows.
“The City covenants that it will, for the purpose of performing and carrying out the duties
imposed on the Engineering Consultants under the provisions of this Resolution, employ
an independent engineer or engineering firm or corporation having a nationwide and
favorable repute for skill and experience in such work.”
The required scope of the Report is described in Section 504 of the Resolution, as follows.
“The City covenants that it will cause the Engineering Consultants employed under the
provisions of Section 705 of this Resolution . . . to make an inspection of the Electric
System at least once each fiscal year and . . . to submit to the City Manager a report
setting forth (a) their findings whether the properties of the Electric System have been
maintained in good repair, working order and condition and whether they have been
operated efficiently and economically and (b) their recommendation as to
(vi) the proper maintenance, repair and condition of the Electric System during the
ensuing fiscal year and a estimate of the appropriations which should be made for such
purposes,
(vii) the insurance to be carried under the provisions of Article VII of this Resolution,
(viii) the amount that should be deposited during the ensuing fiscal year to the credit of
the Improvement and Extension Fund for the purposes set forth in Section 510 of this
Article,
(ix) the extensions, improvements, renewals and replacements which should be made
during the ensuing fiscal year, and
(x) any necessary or advisable revisions of the electric rates.”
City of Dover, Delaware 2-1 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 19
2012 Engineering Consultant’s Report 2.0 – Introduction
2.2 ORGANIZATION
The Electric Utility Director is responsible for the overall management of the Electric Utility
Division. The Electric Director oversees the day-to-day operations of the Electric Division and
manages the Division’s staff. The Director also provides oversight of the Power Plant budget,
monitors the contracts of the energy coordinator and the power generation operator/manager and
is responsible for NAES (Operator) contracts and oversight. The Electric Division is organized
into three separate operating sections. Descriptions of the current Electric Division sections are
provided below.
Administration Section – Administration provides the overall management of the Electric
Division’s Engineering and Transmission & Distribution Sections. This section performs all
planning and budgeting, monitors all construction projects, administers all power supply and
generating station operations agreements, and coordinates with customer service and public
relations for the Electric Division.
Electric Engineering Section – Electric Engineering provides design, specifications, construction
management, and project inspection for all capital investment projects of the Electric Division.
This section also develops and maintains maps, plans, and specifications, as well as engineering
standards for construction and maintenance of the Electric System. Lastly, it is responsible for
the operation of a 24/7 system operations control center, referred to as System Operations.
Transmission & Distribution Section – Transmission & Distribution constructs, operates, and
maintains the overhead and underground Electric Systems and fiber optic communication
facilities. This section installs and maintains all electric metering, as well as street and security
lighting. This section also investigates and resolves customers’ power problems and oversees the
work of tree trimming contractors.
Figures II-1 through II-4 provides organizational charts illustrating the staffing hierarchies of the
various sections in the Electric Division. The number of individuals in each position was
indicated as appropriate. Electric Division staff totaled 47 at the time the FY 2013 budget was
issued.
City of Dover, Delaware 2-2 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 20
2012 Engineering Consultant’s Report 2.0 – Introduction
Figure II-1: Organization
City Manager
Administrative Assistant (1)
Electric Transmission
Administration (4) Electric Engineering (15)
& Distribution (28)
Figure II-2: Administration
Dept. Budget and Staff Supervisor (1)
Account Clerk II (2)
Figure II-3: Electric Engineering
Engineering Services Manager
Engineering Crew Leader (1) Substation Crew Leader (1) Systems Operations Crew Leader (1)
Engineering Fieldworker (2) Relayman (2) Electric System Operators (4)
Electrical Engineer (1) Draftsman (1)
Substation Foreman (1)
City of Dover, Delaware 2-3 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 21
2012 Engineering Consultant’s Report 2.0 – Introduction
Figure II-4: Electric Transmission & Distribution
T & D Supervisor
Senior Lineman (3) Electric Meter Tech Crew Leader (1)
Journeyman Lineman (9) Electric Meter Tech II (2)
Lineman 2nd Class (5)
Lineman 3rd Class (3)
Ground Worker (3)
Stores Coordinator I (1)
The subsequent sections of the Report provide a discussion of the required reviews and
inspections conducted pursuant to Section 504 of the Resolution. Section 3 describes the
assessment of the Electric System and its condition. Section 4 presents the financial results for
the Electric Division, including an analysis of the adequacy of revenues provided by the electric
rates. Section 5 summarizes the conclusions of Burns & McDonnell regarding the operation and
maintenance of the Dover Electric System.
In the preparation of the Report, Burns & McDonnell reviewed and analyzed maintenance
records, audited financial statements, and other data provided by the City. Burns & McDonnell
has relied on the information provided without independent verification, and cannot guarantee its
accuracy or completeness. In addition, Burns & McDonnell has used the information provided to
make certain assumptions with respect to conditions that may exist in the future. While Burns &
McDonnell believes the assumptions made are reasonable for the purposes of the Report, it
makes no representation that the conditions assumed will occur.
*****
City of Dover, Delaware 2-4 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 22
SECTION 3 – ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT
Página 23
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
3.0 ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT
3.1 ELECTRIC SYSTEM OVERVIEW
The Electric System owned by the City of Dover, Delaware (City) primarily consists of
production plant, transmission plant, distribution plant, and general plant facilities, and
construction work in progress. Table 4-1 displays the year-end balances of the various plant
components for FY 2010 through FY 2012. Table 4-2 itemizes the specific capital investment
plan projects and anticipated expenditures included in the FY 2013 budget.
Table III-1
YEAR-END PLANT IN SERVICE
City of Dover Electric Division
FY 2010 FY 2011 FY 2012
Capital assets, not being depreciated
Land $ 1,458,066 $ 1,458,066 $ 1,458,066
Construction in progress 12,772,089 424,809 789,014
Total capital assets, non-depreciable $ 14,230,155 $ 1,882,875 $ 2,247,080
Capital assets, being depreciated
Buildings $ 16,922,580 $ 17,383,566 $ 17,456,628
Production 62,442,716 63,408,937 64,610,399
Transmission 22,651,256 32,558,944 33,106,748
Distribution 55,811,945 59,824,248 60,680,365
Administration 1,530,413 1,551,280 1,634,017
Vehicles 624,428 622,236 640,096
Total capital assets, being depreciated $ 159,983,338 $ 175,349,211 $ 178,128,253
Less accumulated depreciation for:
Buildings $ (10,574,839) $ (10,992,065) $ (11,400,308)
Production (38,692,760) (39,931,442) (41,416,622)
Transmission (8,052,226) (9,206,982) (10,344,554)
Distribution (22,260,895) (23,817,302) (25,322,267)
Administration (1,029,427) (1,102,778) (1,196,545)
Vehicles (427,752) (435,188) (464,219)
Total accumulated depreciation $ (81,037,899) $ (85,485,757) $ (90,144,515)
Total capital assets, being depreciated, net 78,945,439 89,863,454 87,983,738
Total capital assets, net $ 93,175,594 $ 91,746,329 $ 90,230,818
In FY 2012, the Electric System experienced an increase in the annual system peak demand and
a decrease in annual energy sales from the previous year. The Electric System experienced its
City of Dover, Delaware 3-1 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 24
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
peak at 4 p.m. on July 22, 2011 when demand reached 172.555 MW. For the year, approximately
710.3 GWh of energy were sold, a decrease of 3.2 percent from the preceding year. The Electric
Division projects energy sales to increase in FY 2013 to 730.9 GWh, an increase of 2.9 percent.
The Electric Division expects annual energy sales to remain relatively constant from FY 2013
through FY 2017.
Table III-2
FISCAL YEAR 2013 PLANNED CAPITAL EXPENDITURES
City of Dover Electric Division
Electric Engineering Projects:
Distribution System Upgrades $ 400,000
Lighting Project and Rehabilitation 100,000
Horsepond Road Substation Reliability Upgrade 170,000
Substation Equipment & Fencing (Division St) 70,000
Transmission Line Maintenance Program 75,000
Distribution Feeder Replacement Program 277,500
Distribution Capacitors - Overhead 50,000
Distribution Capacitors - Underground 75,000
69kv Switch Replacement 55,000
Frazier Substation Reliability Upgrade 610,200
General Scott Switchgear 50,000
Subtotal Electric Engineering Division $ 1,932,700
Electric Transmission & Distribution Projects:
New Developments - UG Transformers $ 450,000
Vehicles, Trucks, & Equipment 146,000
Subtotal Electric Transmission Division $ 596,000
Electric Generation Projects:
McKee Run Turbine Level Window Modification $ 85,000
Unit 3 - Stack Repairs 27,000
Unit 3 Boiler Systems 129,000
Unit 3 Auxillary System Components 55,000
Unit 3 Turbine Outage/Inspections 115,000
Unit 3 Air Heater Expansion Joint 80,000
Unit 3 Generator Repairs 236,000
Units 1 & 2 Cooling Tower Life Extension 37,300
Units 1 & 2 Stack Repairs 75,000
Units 1 & 2 Component Repairs 52,000
VanSant Capacity Increase 550,000
Subtotal Electric Generation Division $ 1,441,300
Total Planned Capital Investment Projects $ 3,970,000
City of Dover, Delaware 3-2 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 25
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
3.1.1 Production Plant
The City owns two power stations, the McKee Run Generating Station (McKee Run) and the
VanSant Generating Station (VanSant). McKee Run consists of three steam turbine generating
units with a total combined capacity of 136 megawatts (MW). VanSant is a 39-MW simple-cycle
combustion turbine unit.
North American Energy Services Corporation (NAES Corporation) operates the generating
plants. The agreement between the City and NAES Corporation has been in effect since July 1,
2006. The Engineering Consultant’s observations regarding the generating stations and units are
described later in this section of the Report.
Effective July 1, 2011, the City entered into an Energy Management Agreement with The Energy
Authority, Inc. (TEA) to assist the City with its energy procurement, energy sale, purchase of
fuels, establishment and management of risk policies, the development and management of
hedging protocols and related energy procurement challenges.
3.1.2 Transmission and Distribution Plant
The service area includes 44 miles of overhead transmission lines, 0.12 miles of underground
transmission lines, 190 miles of overhead distribution lines and 268 miles of underground
distribution lines. Four Electric Division customers take service off of the 69-kV transmission
system. These customers include the Dover Air Force Base, Kraft, Proctor & Gamble, and NRG
Energy Center (NRG). NRG is an exempt wholesale generator that sells power that must be
transmitted through the City’s transmission system to third party purchasers. When the NRG
plant is not operating the Electric Division provides power for the plant site.
The Electric Division has two contracts for providing transmission service through the Electric
System. The Electric Division provides transmission service to NRG for the output of its 16 MW
electric generator. The Electric Division also has a point-to-point contract for the output of an
NRG Combustion Turbine which ties directly to the Kent Substation and is not part of the Dover
transmission system.
City of Dover, Delaware 3-3 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 26
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
3.1.3 General Plant
The general plant category consists primarily of Electric Division administrative and operations
facilities, and pollution control-related equipment at McKee Run and VanSant. The agreement
with NAES Corporation stipulates NAES Corporation manage the operation and maintenance of
the facilities and the City funds all replacements and upgrades required to maintain the capability
of the two generating stations. The City is also responsible for the costs of compliance with new
regulations promulgated. Other types of items included in the general plant category include
office furniture and equipment, computer-related equipment, transportation and power-operated
equipment, and communication equipment. Burns & McDonnell did not specifically assess the
items in the general plant category for the Report.
3.2 ELECTRIC SYSTEM ASSESSMENT
Burns & McDonnell made observations and conducted assessments of the Electric System assets
in support of the development of this annual Engineering Consultant’s Report. The findings of
Burns & McDonnell from the review of the City’s Electric System are documented herein.
3.2.1 Electric Generating Stations
On March 8, 2013, Mr. Ted Kelly of Burns & McDonnell met with representatives of NAES
Corporation to discuss the condition of the McKee Run and VanSant generating stations. Mr.
Kenneth Beard, the Plant O&M Manager, coordinated the visit along with Mr. Vince Scire, the
Plant Administration and Environmental Health & Safety Manager.
3.2.1.1 Description: McKee Run consists of three units. Units 1 and 2 were originally coal-
fired units, which began operations in 1961 and 1962, respectively. In 1972, these units were
converted to burn No. 6 fuel oil. Units 1 and 2 each have rated capacities of 17 MW. Unit 3
began operations in 1975 and was designed to fire No. 6 fuel oil and natural gas. Unit 3 has a
rated capacity of 102 MW. In FY 2008, the City began work to convert all three units at McKee
Run to burn No. 2 fuel oil in order to reduce pollution from the plant. To date, the necessary
upgrades and new equipment had been installed allowing each of the units to burn both natural
gas and No. 2 fuel oil.
City of Dover, Delaware 3-4 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 27
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
VanSant consists of a simple cycle combustion turbine with a rated capacity of 39 MW. This unit
commenced operation in 1991. VanSant remains unmanned, except when it is dispatched into
service. On the occasions when the unit is dispatched, personnel from McKee Run are
transferred to VanSant to startup and operate the unit.
3.2.1.2 Management and Organization: Station management is very well organized and
knowledgeable. Personnel take a logical approach to the operation and maintenance of the
generation facilities. Mr. Vince Scire serves as the Plant Manager. The management/leadership
team consists of eight members including Mr. Scire. The Administrative & Employee Health and
Safety Manager, Material Management Coordinator, and O&M Manager, all report directly to
Mr. Scire. An Administrative Specialist position is currently open at the plant. This position is
part of the management/leadership team as well.
The O&M Manager oversees a Maintenance Supervisor, a Compliance Specialist and four
Operations teams. Each operations team consists of two supervisors and three operators working
12-hour rotating shifts. Two operators work eight-hour flex time shifts Monday through Friday,
and fill in as needed. The maintenance team consists of a planner, a supervisor and five
employees working eight-hour shifts. The operations and maintenance personnel are all union
employees. The relationship between the union and management was reported to be excellent.
McKee Run is currently at a staff level of 28 employees, with 32 approved positions.
3.2.1.3 Safety: “Safety First” is an overall theme and attitude of the Electric Division. Near-
miss incidents are documented, reviewed, and corrective follow-up actions are taken as required
with an employee-run safety committee actively in place. This committee conducts monthly
safety meetings, completes safety equipment inspections, and defines and implements tasks to
improve safety in all areas. Members of the safety committee complete periodic visual
inspections of employee work activities utilizing an observation checklist to detail their findings.
Recorded observations are discussed and infractions corrected. Safety is the first topic discussed
at all meetings at the generating plant. An indoctrination video emphasizing safety is shown to
all visitors when entering the Station.
City of Dover, Delaware 3-5 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 28
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
There were no restricted work days or lost time accidents reported in FY 2012. NAES ended the
year with 51,786 man-hours worked with no OSHA recordable accidents.
3.2.1.4 Training: The required annual OSHA compliance training is completed and
documented for each employee. A formal two-day employee orientation program is required for
all new employees. This orientation covers a multitude of subjects from employee benefits to a
review of the various Station operating manuals.
For operator training, the Employee Development and Qualification Program (EDQP) has been
established. EDQP is a formal program for training operators to progressively advance to
positions with additional responsibilities. In addition to the above programs, cross training of
various disciplines also occurs. An example of cross training would be plant operators training
with maintenance staff.
Plant staff receive environmental and safety training online via the GPi Learning website. The
training includes tutorials and exams to ensure comprehension of the subject matter. Plant
manuals, meetings, etc. offer additional safety training.
Plant staff continues to receive appropriate operator certification training for the PJM market.
This training should continue in the future. The plant also completed planning and scheduling
training on a regular basis for plant operators.
3.2.1.5 Major Equipment Operation and Maintenance: In general, the generation facilities
appear to have been properly operated and maintained, and in good condition as evidenced by
the high availability of the units. The generation facilities are dispatched sparingly and operate
primarily as peaking units. As such, the individual units incur a relatively large number of starts
per year and low annual capacity factor. Table 4-3 summarizes the major FY 2012 operating
statistics.
City of Dover, Delaware 3-6 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 29
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
The large amount of time that units are not operating allows for maintenance and repair of the
units. As a result, the FY 2012 overall equivalent availability factor for the generation facilities
averaged 66.91 percent. Low net capacity factors are partially offset by Pennsylvania New Jersey
Maryland Interconnection (PJM) capacity credits. In FY 2012, approximately $7.4 million of
PJM capacity credits helped cover the fixed operating and maintenance costs of the Electric
System. PJM capacity credits are expected to continue to provide similar benefits in FY 2013
and beyond.
3.2.1.6 Electronic Management System: Maintenance activities are organized, planned, and
managed using MP2tm by CMMS Data Group, a computer-based management system. All three
major categories of maintenance activities (corrective, preventative, and predictive) are
electronically managed by MP2tm.
Table III-3
FISCAL YEAR 2012 OPERATING STATISTICS
City of Dover Electric Division
Rated Net Net Heat
Capacity - Production - Net Capacity Rate Number of
Unit Number MW MWh Factor Btu/kWh Starts
VanSant 39 714.8 0.21% 11,662 26
McKee Run
Unit 1 17 628.9 0.42% 14,866 3
Unit 2 17 541.7 0.37% 14,775 2
Unit 3 102 21,088.2 2.37% 11,403 29
Total 175 22,973.6 1.50% 60
Forced Equivalent
Outage Operating Service Availability
Unit Number Hours Hours Factor Factor
VanSant - 23.0 0.26% 67.09%
McKee Run
Unit 1 - 96.0 1.10% 66.03%
Unit 2 - 72.0 0.82% 65.99%
Unit 3 - 369.9 4.22% 65.99%
Total - 560.9 6.40%
For corrective maintenance activities, any station operator or mechanic can enter a work order
into the system at any terminal on the Station local area network (LAN). A supervisor reviews
City of Dover, Delaware 3-7 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 30
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
the request, turns it into a work order, and assigns a priority according to a predetermined
categorization. The work order is planned, parts are ordered, and then the work order is assigned
to an operator or maintenance technician for completion once the material has been received.
This system is also used to manage and track preventative maintenance activities that follow a
schedule. Changing filters, and turning on and off heat tracing are examples of preventative
maintenance. Predictive maintenance activities practiced include oil analyses, vibration testing,
and infrared surveys. Portable vibration testing equipment is used at the Stations to improve the
frequency of and capabilities to trouble-shoot rotating equipment. The technology allows
personnel to identify problems and take corrective actions before equipment failure occurs.
3.2.1.7 Electric Generation Improvements: The following describes completed, on-going,
and planned improvements to the City’s generation assets:
Recently Completed:
• DOE Grant - Photovoltaic Panels • Unit 3 Air Heater Expansion Joint
• McKee Run & VanSant Arc Flash • Units 1 and 2 Control Modifications
• McKee Run Driveway Repaving • Units 1 and 2 Stack Repairs Inspection
• Unit 3 Fire Protection System • Unit 3 - Stack Repairs Inspection
• Unit 3 Cooling Tower Life Extension • Unit 3 Boiler Air Heater
• Unit 1 Outage FY 2011 • Unit 3 FD and ID Fan Controller
• Unit 2 - Boiler Inspection & Repair Upgrade
• VanSant CT Mark IV Upgrades • Unit 3 DCS Computers & Software
• Work Management Software Upgrades
Replacement • Units 1 and 2 Component Repairs
• Unit 3 - Gas Modification • VanSant Component Replacements
• Unit 3 Auxiliary System Components
On-Going: • Industrial Wastewater Project – McKee
• McKee Run Preservation of Structures Run
• Units 1 and 2 Component Repairs
• Units 1 and 2 Cooling Tower
Component Repairs
• McKee Run Equipment Replacements
• Unit 3 Boiler Systems
City of Dover, Delaware 3-8 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 31
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
Planned:
• McKee Run Demineralizer Replacement • Unit 3 Generator Repairs
• McKee Run High Energy Piping • Units 1 and 2 Stack Repairs
• Unit 3 Turbine Outage/Inspections • VanSant Capacity Increase
• Unit 3 Cooling Water Line Replacement • Metering System Upgrades
3.2.1.8 Condition Assessment: The following is a summary of the condition assessment of
major equipment at Mckee Run and VanSant as presented by the NAES corporation staff. Burns
& McDonnell made no internal assessments of equipment during the facility tour.
3.2.1.9 Steam Turbines/Generators: The steam turbines and generators for VanSant and
McKee Run Units 1 and 2 were reported to be in satisfactory condition with no major problems.
McKee Run Unit 3 turning gear engagement problems were reported in the summer 2010 outage
report and repairs were completed in FY 2012.
XL Insurance completes inspections of the Electric Division production facilities on an annual
basis. After each inspection the insurance provider issues a report detailing its risk reduction
recommendations. A recommendation following the FY 2011 inspection addressed safety. XL
Insurance recommended the installation of a permanent fire protection system for the turbine
generator bearings at McKee Run. The City completed the installation of the system in FY 2011
for Unit 3. The City and XL Insurance agree that portable foam generating carts are sufficient
fire protection for Units 1 and 2, due to their light use.
For FY 2012, Unit 1 conducted turbine generator checks and found a bearing steam seal leak.
Steam seals were removed and sent out for refurbishment by Siemens Energy Services during the
fall 2012 outage. Turbine condition assessment was conducted during the fall outage and the
Units were found to be in satisfactory working condition. Repairs are scheduled for Unit 3
turbine and generator systems. The long lead material requirements are being developed for bid
and will be procured in the spring of 2013.
3.2.1.10 Boilers and Auxiliaries: Boiler inspections are conducted every year on each of the
boilers. Each fiscal year, the inspections on each boiler typically include the inspection and
cleaning of the major boiler components, including the mud and steam drums, the forced draft
City of Dover, Delaware 3-9 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 32
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
and induced draft fans, the windbox, condenser water box, condenser tubes, hotwell, air
preheater components, and safety valves.
In FY 2010, McKee Run Unit 1 experienced a tube failure and excursion and consequently was
shut down. The City hired a contractor to supply replacement parts and repair the tube by
replacing a tube section. After an internal inspection, plant staff made the decision to replace six
additional tubes in Unit 1. The City subsequently hired inspectors to examine the repaired unit
and provide recommendations for additional repairs and inspections. These maintenance
recommendations helped determine certain projects to be completed during future outages.
In FY 2011, the outlet duct expansion joint was replaced at Unit 3. Operations removed the
appropriate insulation and lagging to prepare the duct. The Electric Division contracted Apex to
complete the installation the equipment. A complete seam weld was utilized to seal the joint and
the job site was cleaned. No additional problems with this joint developed in FY 2012.
In FY 2012, several principle changes were made on the generating system’s boiler and auxiliary
units at McKee Run. New beck drives were installed on Unit 3 induced draft and forced draft
fans. Also, sector plates and seals were replaced for the Unit 3 air heater.
Following its FY 2010 annual inspection of the production facilities, XL Insurance
recommended the City implement a program that tracks annual hot and cold settings of hangers
in the steam, reheat, feedwater and boiler systems. In FY 2011 and FY 2012, the City met the
recommendation by implementing a program that will examine the high energy piping systems
on a five-year basis, beginning in 2014.
3.2.1.11 Station Cooling Water Systems: The Station has split cooling water systems with
one system serving Unit 1 and Unit 2 and a separate system serving Unit 3. Projectile tube
cleaning was completed on Unit 1 and Unit 2 condensers during the spring FY 2011 outage. All
the tubes in each unit were cleaned utilizing the scraper blade plug method. Samples were taken
from the tube cleanings and retained for inspection. No leaks were detected in the expansion
joint or condenser tubes. Each condenser box was cleaned. Projectile tube cleaning was last
City of Dover, Delaware 3-10 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 33
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
completed in the 1980’s. The cooling water systems are reported to be sufficiently sized and in
satisfactory condition, with no major issues reported at the time of this Report.
3.2.1.12 Fuel Handling Systems: Natural gas comes into the Station in a 4-inch diameter
pipeline for Unit 1 and Unit 2 and in a 10-inch diameter pipeline for Unit 3. No. 2 fuel oil is
delivered to the Station and unloaded into tanks. Forwarding pumps deliver the fuel oil to each of
the units. No major fuel projects were reported to be completed in FY 2012.
3.2.1.13 Water Treatment/Steam Purity: Quality control parameters for boiler feed-water,
internal boiler water, cooling tower water, and steam purity are checked at a minimum of twice
per day when systems are operating. Results are recorded and graphically compared to control
limits. Adjustments are then made as required. Boiler feed water is treated city water (well water
from City) using a regenerative ion resin demineralizer system, along with deaeration for oxygen
control. Boilers 1 and 2 use a coordinated phosphate control for boiler internal purity control and
Boiler 3 uses a balanced trisodium phosphate and disodium phosphate within a narrow pH range.
A deep-bored water well was installed to provide water in addition to the city supplied water.
City water has a high chlorine level which may exceed the Station permitted limits. By
combining City water with the well water, the chlorine levels can be maintained at the permitted
limits. Water for cooling tower makeup is also obtained from City water. The primary control
parameter is silica concentration. Blow down is adjusted as required to maintain control. The
City is currently undergoing the approval process with Kent County to obtain an integrated waste
water permit to be able to discharge cooling water to the sewer system. No major issues were
reported at the time of this Report.
Steam purity is not continuously monitored. Samples are taken twice daily and tested for pH,
conductivity, and silica. There have not been any problems with steam purity. Annual
inspections of the boiler drums and separation internals have verified that these systems are
intact and operating properly.
Following its FY 2010 annual inspection of the production facilities, XL Insurance
recommended the City implement lay-up procedures to protect water systems from corrosion. In
City of Dover, Delaware 3-11 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 34
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
FY 2011 and FY 2012, NAES worked to update plant procedures to conform to best
practices/OSHA standards.
In FY 2012, the station did not experience any internal corrosion related failures, steam path
deposits, or excessive condenser fouling. NALCO provides water treatment consulting services
and chemicals. A representative visits the station periodically to review test data and check
chemical usage rates. No major issues were reported at the time of this Report.
3.2.1.14 Station Electrical Systems: Overall, station electrical systems and transformers are
considered to be in satisfactory condition. A condition assessment of the generation facilities’
transformers was conducted in February 2011. Oil inspections and analyses were made. The
inspector recommended that normal operation continue for all the transformers at the plant. Oil
sampling is now completed twice per year on the GSUs. All plant transformers are examined
annually.
Following its FY 2008 annual inspection of the production facilities, XL Insurance
recommended the City build blast walls around transformers at the plant. In FY 2011, the City
continued to research blast wall protection. Based on the 2012 XL Insurance annual inspection,
there are still no concrete walls or sprinkler protection for GSU’s 1-3. Fire barrier walls were
installed between the Unit 1 and 2 auxiliary transformers and the Unit 3 start-up transformer.
3.2.1.15 Station Control Systems: Unit 1 and Unit 2 controls are electro-pneumatic and Unit
3 controls are a distributed control system (DCS). During the March FY 2011 spring outage, a
controls upgrade was completed at McKee Run Units 1 and 2. The new devices will control
igniters, pilots and shut down main fuel to protect the boiler. The project included the installation
of new limit switches on main gas, pilot gas, and oil supply/return valves. The controls upgrades
help the system meet national fire protection codes.
Following its 2007 annual inspection of the production facilities, XL Insurance recommended
the City seal openings in fire barriers through which cables pass. The City has worked each year
since to make progress on sealing openings in fire barriers. The City intends to seal the rest of
the openings as part of its boiler controls and control room upgrades.
City of Dover, Delaware 3-12 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 35
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
In general, the station control systems are considered to be in satisfactory condition. The Unit 1
and Unit 2 control systems are outdated but perform satisfactorily. All relays have recently been
inspected at both McKee Run and VanSant for North American Electric Reliability Corporation
(NERC), Pennsylvania-New Jersey-Maryland (PJM) Interconnection and Mid-Atlantic Area
Council (MAAC) compliance. The EHC system will be modified in the future to become a
primary/primary system. No major issues were reported at the time of this Report.
3.2.1.16 General Facilities: No major projects or improvements were completed to the
General Facilities in FY 2012 other than routine maintenance and repairs. In general, the station
facilities appeared clean and well maintained during the site visit.
3.2.1.17 VanSant Generating Station: In general, the unit is operated infrequently, but is well
maintained. Although the station is only manned when operating, an operator performs a twice
daily walk through with a checklist of items to review and the results are logged. The annual
overhaul and inspections were conducted at VanSant during FY 2012. No major problems were
found.
The VanSant unit now has the capability of completing black starts. Upgrades have been made to
provide the capability of remote control of the unit; however, complications have not made
remote control possible.
XL Insurance completes inspections of the Electric Division production facilities on an annual
basis. After each inspection the insurance provider issues a report detailing its risk reduction
recommendations. The lone recommendation for VanSant following the FY 2012 inspection
addressed safety. XL Insurance recommended the installation of gas detection equipment at the
plant. A gas detection system has been installed. The gas detectors will activate the fire
suppression system and alarm to the central control system. No other major repairs or upgrades
were made at VanSant in FY 2012.
City of Dover, Delaware 3-13 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 36
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
3.3 TRANSMISSION AND DISTRIBUTION SYSTEMS
On March 7, 2013, Mr. Ted Kelly visited the City to collect information and to observe the City
transmission and distribution system, as operated and maintained by the Electric Division. Mr.
Steve Enss, the Engineering Services & System Operations Superintendent, provided
information related to the transmission and distribution system. Mr. Enss also led a tour of the
electric transmission and distribution system.
The Electric Division distributes power to its customers by a network of transmission lines,
distribution substations, and distribution lines. The transmission lines are rated at 69 kV and are
connected to fifteen distribution substations located throughout the service area. The distribution
substations reduce the power from transmission voltages to the primary distribution voltages of
12 kV to facilitate distribution of electric power to customers.
3.3.1 Safety Mr. Enss reported to Burns & McDonnell that there were no reportable injuries or
lost workdays in FY 2012.
3.3.2 System Reliability The Electric Division provides for reliability of its distribution
system by configuring a majority of its distribution circuits in primary open loop arrangements,
improving existing circuits, and installing adequate substation transformer capacity. Normal
transformer and line loading are limited to provide sufficient margin to convey firm power
requirements during an emergency or a switching operation, or for maintenance.
3.3.3 Power Quality The Electric Division does not have any significant power quality
problems. The overall power factor for the Electric System increased from approximately 98.43
percent in FY 2011 to 99.86 percent in FY 2012. Power transformers are equipped with load tap
changers that regulate bus voltages at the distribution substations. Distribution transformers are
equipped with no-load taps to make voltage adjustments. There are capacitors and voltage
regulators on the Electric System that control voltage and vars on the portion of the system
furthest away from the current source and generation. The system operators monitor the power
factor closely and turn on capacitors or adjust the generation to compensate for low power
factors.
City of Dover, Delaware 3-14 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 37
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
3.3.4 Operations and Maintenance: The Electric Division has a SCADA system that is
monitored continuously for any problems that may arise in the Electric System. The main control
room has two system operator desks and a large screen where system operating information is
displayed. System operators can monitor the Electric System operation, such as voltage levels,
current flows, etc. and make necessary adjustments as problems arise. The systems operators
have received some PJM training, but are not required to be certified as Delmarva Power is the
controlling agency.
Loading on substation transformers used for an emergency, a switching operation, or
maintenance is limited to 120 percent of the rated capacity, followed by a twelve-hour cool-
down period. The Electric Division has nine line crews to work on the system. Four crews are
responsible for overhead lines, four crews are responsible for underground lines, and one crew is
responsible for maintenance. The primary responsibilities of the eight line crews are installation
of new service connections and construction of new lines. The Trouble crew maintains the street
lights, repairs underground services and is the first responder to outages. Tree trimming is
contracted out and is no longer performed by the Electrical Division; however, performance of
the contractor is monitored by the Line Crew Superintendent.
The Substation/Relay Maintenance Division is responsible for operation and maintenance of the
substations and associated equipment. Visual inspections of substations, associated equipment,
trip counter checks, battery systems checks, and oversee annual transformer condition
assessments are performed regularly.
TJ/H2b Analytical Services completed the annual transformer condition assessments in February
2011. No abnormal gas was indicated and since the oil condition was within acceptable
parameters, TJ/H2b recommended the continuation of normal operation. The City has a contract
with an environmental consultant to check each substation for oil leaks and to provide instruction
on cleaning up in the event of an oil spill.
City of Dover, Delaware 3-15 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 38
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
The City contracts with an outside firm to inspect and chemically treat each wood pole in the
Electric System every ten years. This is accomplished by awarding a five-year contract to spread
out the expenses. No pole treatments were reported as completed in FY 2012.
3.3.5 Design Standards and Specifications: The Electric Division designs the transmission
and distribution circuits and some substation upgrades in conformance with national safety
standards. Other substation and transmission design is contracted to Pike Electric, Inc.
The underground distribution design utilizes road or alley front access construction. This design
means the electrical equipment, such as transformers and underground cable, are installed beside
the road instead of behind houses or buildings. The advantage of front access construction is the
accessibility for maintenance and repairs to cable and electric equipment. The underground
cables are installed in PVC pipe for added protection and for easy cable replacement. The
Electric Division installs jacketed, concentric cable that is rated at 15 kV, with 133 percent
Ethylene Propylene Rubber (EPR) insulation.
The standard overhead distribution design utilizes a flat construction using a single cross-arm
and insulators on 45-foot class 2 poles. Typically all electrical equipment locations have ground
rods installed with measured readings of 25 ohms or less.
The substation design is generally a low-profile rigid bus design. The circuit breakers are SF6
gas-filled and the relays are microprocessor based with SCADA control and monitoring.
3.3.6 Transmission and Distribution Capital Improvements: The following describes
completed, on-going, and planned improvements to the City’s transmission and distribution
assets:
Recently Completed: • Transmission Relaying, Replacement
• 69-kV Feeders 3 and 4 and Calibrations
• Replacement of 69-kV Breakers & • Outage Management System
Design Planned:
• Governors Avenue Rebuild • Replace Substation Equipment and
• Mid City Substation Upgrades Fencing
• Substation PT and CT Replacement • McKee Run Yard Rebuild
City of Dover, Delaware 3-16 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 39
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
• North Street 69-kV Cable Replacement On-Going:
• System Automation & SCADA Equip. • Distribution System Upgrades
• Horsepond Substation to Cartanza 69-kV • Lighting Project and Rehabilitation
Rebuild • New Developments – Underground
• General Scott Switchgear Transformers
• 69-kV Substation Switch Replacement
• New Developments – Underground
Conductors and Devices
• Single Phase Meters
• Horsepond Road Substation Reliability
Upgrade
• Distribution Capacitors - Overhead
• Distribution Feeder Replacement
Program
• Distribution Capacitors - Underground
• Frazier Substation Reliability Upgrade
• 69-kV Substation Switch Replacement
3.3.7 Condition Assessment: The transmission and distribution system assessment included
drive-by observations of a sample of the transmission circuits, distribution circuits, and
substations. Many of the fifteen substations were physically observed during the tour. The
following substations were observed during the tour:
• Mid City Substation • Division Street Substation
• Frazier Substation • St. Jones Substation
• North Street Substation • Horsepond Substation
• General Scott Substation • Cartanza Substation
• Lebanon Substation
The first stop during the transmission and distribution system evaluation was the Mid City
Substation. In FY 2011, breaker change outs were completed. The oil breakers were replaced
with SF6 breakers at the substation. Routine maintenance was completed at the Frazier
Substation in September 2010 and reliability upgrades are scheduled to begin in FY 2012.
Switch replacement was completed at the North Street Substation and cable replacement is on
City of Dover, Delaware 3-17 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 40
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
the Electric Division’s five-year capital plan. Switches were replaced at the General Scott
Substation and the 69-kV breakers were replaced. The switchgear is scheduled for replacement
in FY 2015 at the General Scott Substation.
The Lebanon, Division Street, St. Jones, and Horsepond Substations appeared to be in good
condition. Routine maintenance was completed in FY 2011 at these locations. There was little to
no vegetation visible and the yards appeared to be well maintained.
The Cartanza Substation was observed during the system tour. Cartanza is a 230/69-kV
substation, which serves as a tie with Delmarva. Delmarva maintains the 230-kV side of the
station, while the City of Dover maintains the 69-kV side. In FY 2011, tap changer seals were
replaced at the substation. The Electric Division works Delmarva Power on transformer testing.
Cartanza currently has four 69-kV lines leaving the station. The four circuits leave the station on
two diverse pole lines, each holding a double circuit, until the circuits split down the line. This
configuration allows for two separate loops for the entire 69-kV system to minimize total system
failure should one common pole be critically damaged.
Along the transmission and distribution system tour route, additional projects were detailed. The
replacement of old underground circuits was completed in December 2011. Also, a number of
insulators were replaced due to some breakdowns primarily due to age. Specifically, a
transmission line near McKee Run was replaced because of the continual damage sustained by
cooling tower exhaust. Another transmission line connecting a 10-MW Sun Power solar project
was completed during the fall of FY 2011. Force labor completed the job. The transmission line
featuring composition poles was completed in time to shave 6 MW from the system peak.
In addition, the tour included driving through several residential areas that are served by
underground distribution lines. The pad mounted transformers observed along the way appeared
to be in good condition.
3.4 CONCLUSIONS
Based on statements and information provided, as well as the observations and reviews
performed, it is the opinion of Burns & McDonnell that the City’s power generation facilities are
City of Dover, Delaware 3-18 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 41
2012 Engineering Consultant’s Report 3.0 – Electric System Overview and Assessment
being operated and maintained consistent with accepted electric utility practice in the United
States. In general, the performance, operation, maintenance, staff, planning, and training aspects
for the McKee Run and VanSant stations were found to be above average. Specifically, the
generation facilities have demonstrated a high level of availability despite the dispatching of the
units primarily for peak demand.
It is the opinion of Burns & McDonnell that the design, construction, operation and maintenance
of the City’s electric transmission and distribution system and the associated facilities are
consistent with current generally accepted electric utility standards. In completing Annual
Engineering Consultant’s Reports over the past several years, Burns & McDonnell has observed
that the City has made appropriate system upgrades and improvements. The City and the Electric
Division are proactive in preventative maintenance and expansion of the Electric System before
problems arise.
*****
City of Dover, Delaware 3-19 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 42
SECTION 4 – FINANCIAL ASSESSMENT
Página 43
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
4.0 FINANCIAL ASSESSMENT
A review of the financial results of the Electric System for the fiscal year (FY) ended June 30,
2012, is provided below.
4.1 FINANCIAL RESULTS
The total revenue of the Electric Division during FY 2012 included revenue from charges for
electric service, as well as miscellaneous revenues from items such as rents, penalties,
reconnection fees, and development fees. On the Comparative Statement of Revenues, Expenses,
and Changes in Unreserved Retained Earnings Table, revenues were compared to the Electric
Division’s costs of providing services to its customers to determine whether the financial
requirements of the Electric Division were met.
4.1.1 Required Revenue Level
The level of revenues required from the retail electric rates for the Electric Division was
determined through the analysis of the financial results and net income or net margins for the
most recent fiscal year. The City of Dover, Delaware Resolution Authorizing and Securing
Electric Revenue Bonds, adopted December 23, 1985 requires that the Electric Division maintain
a debt service coverage ratio of 1.25. The following is an excerpt from Section 502(c) of the
resolution.
“(c) The total amount of the Revenues of the Electric System during the preceding fiscal
year shall have been not less than the total of the following:
(3) The Current Expenses of the Electric System during the current fiscal years shown by
the Annual Budget . . . for such fiscal year, and
(4) One hundred twenty-five percent (125%) of the maximum amount of the Principal
and Interest Requirements for any fiscal year thereafter on account of all bonds then
Outstanding under the provisions of this Resolution.
The City further covenants that, from time to time and as often as it shall appear necessary, it
will adjust the electric rates as may be necessary or proper so that the revenues of the
Electric System in each fiscal year will not be less than the total of the amounts set forth in
subdivision (c) of this section.”
City of Dover, Delaware 4-1 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 44
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
4.1.2 Electric Rates
Customers of the Electric Division are charged for the electric service based on rate schedules,
tariffs, or contracts that reflect the costs to the Electric Division of providing that service. For
purposes of setting electric rates, customers with similar load and service characteristics should
be placed in the same rate classification.
A comprehensive cost-of-service and rate design study was completed in 2006 and subsequent
rate analyses were completed in 2007 and 2008 to examine revenue requirements and revenue
generation. Specifically, the 2006 rate study was conducted to address increased costs associated
with a new power supply contract that became effective on July 1, 2006. The rate study
recommended combining a number of rate classes and implementing rate increases on July 1,
2006. The 2006 rate study also recommended an additional increase be implemented on January
1, 2007 to cover increased costs associated with operating the generating station. The 2007 and
2008 rate analyses re-examined Electric Division revenues and expenses and recognized
additional revisions to power supply costs. As a result of these analyses, additional rate increases
were implemented on July 1, 2007 and July 1, 2008. The City retained Burns & McDonnell to
complete a new cost-of-service and rate design study in fourth quarter FY 2012. The study
examined revenue adequacy, revenue responsibility, and revenue recovery for the Electric
Division. The FY 2012 study scrutinized customer classes and proposed adjustments for demand
rate components and corresponding changes to energy charges. The current rate classes are listed
below.
• Residential • Primary
• Small Commercial (1 Phase, 3 Phase, 1 • Transmission
Phase Heating, Church, and Municipal) • Outdoor Development Lighting
• Medium Commercial (1 Phase & 3 • Private Outdoor Lighting
Phase)
• Water Pumping
• Large Commercial (3 Phase with
Reactive Metering) • Supplemental for NRG
4.1.3 Operating Results
Table IV-1 presents a summary of the annual energy sales, the average monthly number of
customer accounts, and the annual average kilowatt-hour (kWh) energy per customer of the
City of Dover, Delaware 4-2 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 45
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
Electric Division for FY 2010 through FY 2012. After reaching a low in FY 2010 for the three-
year period, annual energy sales increased to 734.1 GWh in FY 2011. On a percentage basis, the
one-year increase equaled 3.6 percent. Annual energy sales decreased in FY 2012 to 710.3 GWh,
a decrease of 3.2 percent.
Table IV-1
ANNUAL SALES AND CUSTOMERS
City of Dover Electric Division
FY 2010 FY 2011 FY 2012
Energy Sales (kWh)
Residential 193,911,702 208,092,047 196,388,942
Commercial 237,608,938 243,985,517 230,814,311
Primary 148,381,527 153,879,249 160,560,686
Transmission 128,628,155 128,146,159 122,563,783
Total Energy Sales 708,530,322 734,102,972 710,327,722
Average Number of Customers (bills)
Residential 19,785 19,730 19,910
Commercial 3,371 3,140 3,355
Primary 36 42 39
Transmission 4 3 4
Total Customers 23,196 22,915 23,308
Energy Per Customer
Residential 9,801 10,547 9,864
Commercial 70,493 77,702 68,797
Primary 4,102,715 3,663,792 4,116,941
Transmission 32,157,039 42,715,386 30,640,946
Average Energy Per Customer 30,546 32,036 30,476
Table IV-2 presents revenues from sales, revenue per kWh ratios, and average revenue per
customer ratios for each revenue classification. Total revenue from sales to electric customers in
FY 2012 was approximately $91.1 million, representing a decrease of $7.6 million, or 7.6
percent from FY 2011. Total revenue from sales to electric customers includes utility tax revenue
and power cost adjustment revenue.
In FY 2012, the average rate revenue per kWh for residential customers was 14.29 cents and the
total average rate revenue was 12.94 cents per kWh. The July 2011, through June 2012 national
average monthly utility-level retail sales of electricity and associated revenue per kWh, as
published by the US Energy Information Administration (EIA), were 11.85 and 9.86 cents per
City of Dover, Delaware 4-3 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 46
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
kWh, respectively. For a state-wide comparison, the EIA summarized the Delaware July 2010,
through June 2011 average monthly utility-level retail sales of electricity and associated revenue
per kWh to be 13.57 cents per kWh for residential customers and 11.29 cents per kWh across all
sectors. 1
Table IV-2
ANNUAL REVENUES AND SALES RATIOS
City of Dover Electric Division
FY 2010 FY 2011 FY 2012
Revenue
Residential $ 29,320,410 $ 30,774,462 $ 28,072,775
Commercial 36,856,716 36,572,134 33,381,554
Primary 18,025,548 18,450,238 17,986,987
Transmission 13,878,764 13,716,322 12,506,664
Total Revenue $ 98,081,438 $ 99,513,156 $ 91,947,980
Revenue/kWh
Residential $ 0.1512 $ 0.1479 $ 0.1429
Commercial 0.1551 0.1499 0.1446
Primary 0.1215 0.1199 0.1120
Transmission 0.1079 0.1070 0.1020
Total Revenue/kWh $ 0.1384 $ 0.1356 $ 0.1294
Revenue Per Customer
Residential $ 1,482 $ 1,560 $ 1,410
Commercial 10,935 11,647 9,950
Primary 498,402 439,291 461,205
Transmission 3,469,691 4,572,107 3,126,666
Average Revenue Per Customer $ 4,228 $ 4,343 $ 3,945
The Electric Division’s largest cost in providing electric service to its customers in FY 2012 was
the wholesale cost of power. The Electric Division purchased power from the PJM
Interconnection marketplace through its Energy Manager, TEA. The cost of non-generated
power includes energy and demand costs, power supply management expense, PJM charges and
credits, generation fuels cost, and capacity charges and credits.
The significance of power supply cost to the Electric Division is illustrated in Table IV-3. The
top portion of the Table shows net operating revenue as the difference between total revenues
1
US Energy Information Administration, Form EIA-826 Data Monthly Electric Utility Sales and Revenue Data,
http://www.eia.gov/cneaf/electricity/page/sales_revenue.xls (Mar. 19, 2012)
City of Dover, Delaware 4-4 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 47
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
generated by the rates and the cost of power supply. 2 The ratios of power supply cost to sales
revenues were calculated for FY 2010 through FY 2012. As illustrated, the Electric Division’s
power supply cost as a percentage of rate revenue decreased from approximately 70.0 percent in
FY 2011 to 64.1 percent in FY 2012.
Table IV-3
NET REVENUE MARGINS AND UNACCOUNTED FOR ENERGY
City of Dover Electric Division
FY 2010 FY 2011 FY 2012
Net Revenue Margins ($)
Sales Revenues $ 98,081,438 $ 99,513,156 $ 91,947,980
Power Supply 72,695,602 69,616,076 58,929,133
Net Revenue Margin $ 25,385,836 $ 29,897,080 $ 33,018,847
Net Revenue Ratio 74.1% 70.0% 64.1%
Unaccounted for Energy (kWh)
Power Supply 751,250,000 768,254,000 738,190,000
Energy Sales 708,530,322 734,102,972 710,327,722
Unaccounted for Energy (Losses) 42,719,678 34,151,028 27,862,278
Percentage 5.7% 4.4% 3.8%
Table IV-3 also illustrates the ratio of the amount of energy purchased and delivered to the
electric system to total energy sales. This relationship identifies the level of unaccounted for
energy in the Electric System. This unaccounted for energy may include energy that was
unmetered, metered inaccurately, stolen, lost, PJM transmission line losses, local system
line/transformer losses, etc. The bottom portion of Table IV-3 presents these comparisons for the
Electric Division for FY 2010 through FY 2012. As shown, the percentage ratio of the
unaccounted for energy to the total energy purchased for FY 2011 was 4.4 percent. This is down
from 5.7 percent in FY 2010.
Table IV-4 presents a re-creation of the Electric Division’s Statement of Revenues, Expenses,
and Changes in Unreserved Retained Earnings for the Electric Revenue Fund for FY 2010
2
For the purposes of this Report, the phrase “Power Supply” refers to the sum of the costs of power purchased and
power generated. This includes plant costs and the cost of fuel. Power Supply also includes any expenses in the CIP
Fund that are not capital expenses. The phrase “Purchased Power” refers only to the cost of power purchased from
the market and other directly associated costs.
City of Dover, Delaware 4-5 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 48
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
through FY 2012. Net income increased from FY 2011, totaling $8.5 million in FY 2012. A
reduction of $12.5 million in operating expenses allowed for a $4.1 million increase in net
operating income for the year; however, operating transfers out resulted in an annual net income
decrease. Annual operating transfers out totaled ($7.9) million.
Table IV-4
COMPARATIVE STATEMENT OF REVENUES, EXPENSES, AND
CHANGES IN UNRESERVED RETAINED EARNINGS
City of Dover Electric Division
FY 2010 FY 2011 FY 2012
Operating Revenues:
Charges for Electric Service $ 98,081,438 $ 99,513,157 $ 91,947,980
Miscellaneous Services/Incomes 2,197,036 2,389,462 1,581,421
Total Operating Revenues $ 100,278,474 $ 101,902,619 $ 93,529,401
Operating Expenses:
General Administration $ 5,529,887 $ 5,298,869 $ 5,223,149
Power Supply 72,695,602 69,616,076 58,929,133
Transmission/Distribution 3,146,123 3,083,714 3,023,566
Engineering 1,465,740 1,722,244 1,163,379
Metering 301,416 204,352 205,791
System Operations 496,195 486,894 498,063
Utility Tax 1,922,645 1,944,543 1,548,208
Depreciation 4,106,802 4,710,658 4,783,444
Retiree Health Care 531,843 1,839,110 1,015,731
Total Operating Expenses $ 90,196,253 $ 88,906,460 $ 76,390,464
Net Operating Income $ 10,082,221 $ 12,996,159 $ 17,138,937
Non-operating Revenues (Expenses)
Interest Earned
Operating Fund $ 37,849 $ 832,145 $ 120,876
Reserved Funds 865,878 511,922 348,640
Net Increase in Fair Value of Investments (168,775) (861,216) 45,200
Interest and Fiscal Charges (648,581) (1,385,035) (1,283,174)
Bond Discount Amortized (113,206) (21,579) -
Gain/(Loss) on Sale of Assets 17,984 16,830 47,966
Total Non-operating Revenues(Expenses) $ (8,851) $ (906,933) $ (720,492)
Net Income Before Operating Transfers $ 10,073,370 $ 12,089,226 $ 16,418,445
Operating Transfers - Out (6,758,100) (8,856,000) (7,876,288)
Total Net Operating Transfers $ (6,758,100) $ (8,856,000) $ (7,876,288)
Net Income $ 3,315,270 $ 3,233,226 $ 8,542,157
City of Dover, Delaware 4-6 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 49
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
4.1.4 Adequacy of Electric Rates
The City’s Bond Resolution requires annual revenues of the Electric Division be no less than the
total current expenses plus 125 percent of the greatest remaining annual debt service. “Current
expenses”, as defined in the Resolution, includes all expenses necessary to maintain and repair
the Electric System, all administrative expenses, and engineering, legal or other consultant fees.
Transfers to reserve accounts and special purpose funds, and allowances for depreciation are
specifically excluded from “current expenses.”
In order to determine if the City and the Electric Division have met this requirement, the net
income shown in Table IV-4 was adjusted to include the interest on bonds, depreciation expense,
and other non-cash income and expenses. Table IV-5 presents the adjustments to net income and
the determination of the revenues available for debt service for FY 2010 though FY 2012.
Table IV-5
DEBT SERVICE COVERAGE CALCULATION
City of Dover Electric Division
FY 2010 FY 2011 FY 2012
Net Income $ 3,315,270 $ 3,233,226 $ 8,542,157
Plus Excluded Expenses:
Operating Transfers - Out $ 6,758,100 $ 8,856,000 $ 7,876,288
Depreciation 4,106,802 4,710,658 4,783,444
Interest and Fiscal Charges 648,581 1,385,035 1,283,174
Bond Discount Amortized 113,206 21,579 -
Gain/(Loss) on Sale of Assets (17,984) (16,830) (47,966)
Less Excluded Income:
Net Increase in Fair Value of Investments 168,775 861,216 (45,200)
Interest Earned - Reserve Funds (865,878) (511,922) (348,640)
Revenues Available for Debt Service $ 14,226,872 $ 18,538,962 $ 22,043,257
Maximum Principal and Interest in Any Year $ 3,347,479 $ 3,401,954 $ 3,401,954
Debt Service Coverage 4.25 5.45 6.48
Minimum Required Debt Service Ratio 1.25 1.25 1.25
As Table IV-5 illustrates, the City and the Electric Division maintained a debt service coverage
ratio each year that exceeded the required 125 percent plus current expenses. Therefore, the
City of Dover, Delaware 4-7 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 50
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
revenues generated by the current electric rates have been sufficient to meet the applicable
covenants of the Resolution.
Section 502 of the Resolution requires that the annual debt service used in evaluating the
revenues is to be the maximum amount for any fiscal year thereafter. Table IV-6 presents the
annual totals of principal and interest amounts due on bonds currently outstanding. The
calculation of the debt service coverage ratio in Table IV-5 is based on the total maximum debt
service expense in any fiscal year. The FY 2012 calculation was based on the total FY 2016 debt
service expense of $3,401,954.
4.2 STATUS OF REVENUE BONDS
At the end of FY 2012, the City had two series of outstanding electric revenue bonds that were
issued pursuant to the Resolution. On July 1, 2008, the City issued $22,200,000 in Electric
Revenue Bonds (2008 Bonds). The proceeds from the sale of the 2008 Bonds were used (i) to
finance or reimburse the City for improvements to the City’s electric system; (ii) to fund a Debt
Service Reserve Fund; and (4) to pay the costs of issuance of the 2008 Bonds.
On November 17, 2010, the City issued $8,810,000 of Electric Revenue Refunding Bonds
(Series 2010). The proceeds from the sale of the Series 2010 Bonds were used (i) to refund the
Series 2004 Bonds, and (ii) to pay the costs of issuance of the Series 2010 Bonds. The non-
taxable Series 2010 Bonds received an underlying rating of Aa2 by Moody’s Investors Services
and an underlying rating of A+ by Fitch Ratings.
Table IV-6 illustrates the debt service schedule for the Series 2008 and 2010 Bonds. The
principal and interest and the annual total are shown for each series of bonds. At the time of
issuance of the Series 2010 Bonds, the combined outstanding principal balance for both series of
bonds was $30,280,000.
City of Dover, Delaware 4-8 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 51
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
Table IV-6
DEBT SERVICE SCHEDULE OF ELECTRIC REVENUE BONDS
City of Dover Electric Division
2008 Electric Revenue Bonds 2010 Electric Revenue Refunding Bonds Total Annual
Period Principal Interest Debt Service Principal Interest Debt Service Debt Service
FY 2013 410,000 1,006,954 1,416,954 1,700,000 253,100 1,953,100 3,370,054
FY 2014 430,000 986,454 1,416,454 1,740,000 219,100 1,959,100 3,375,554
FY 2015 450,000 964,954 1,414,954 1,810,000 166,900 1,976,900 3,391,854
FY 2016 475,000 942,454 1,417,454 1,890,000 94,500 1,984,500 3,401,954
FY 2017 695,000 918,704 1,613,704 - - - 1,613,704
FY 2018 730,000 883,954 1,613,954 - - - 1,613,954
FY 2019 765,000 847,454 1,612,454 - - - 1,612,454
FY 2020 800,000 815,706 1,615,706 - - - 1,615,706
FY21-34 16,325,000 6,618,185 22,943,185 - - - 22,943,185
Total $21,470,000 $ 15,013,223 $36,483,223 $ 8,810,000 $ 911,867 $ 9,721,867 $46,205,090
4.3 INSURANCE
The City maintains a comprehensive insurance program to insure against varying types of
liabilities and significant losses related to various Electric Division properties. Section 706 of the
Resolution reads:
"The City covenants that it will maintain a practical insurance program, with
reasonable terms, conditions, provisions and costs, which the City Manager
determines, with the approval of the Engineering Consultants, will afford adequate
protection against loss, including loss of Revenues, caused by damage to or
destruction of the Electric System or any part thereof and also comprehensive public
liability insurance on the Electric System for bodily injury and property damage in
such amounts as may be approved by the Engineering Consultants.”
Tables IV-7 and IV-8 summarize itemized insurance coverage procured by the City for the
period July 1, 2012, through June 30, 2013. Burns & McDonnell has reviewed this list of
insurance, and in the opinion of Burns & McDonnell, as Engineering Consultant and not as
insurance counselor, the insurance in full force and affect appears to satisfy the requirements of
Section 706 of the Resolution.
4.4 OPERATING AND RESERVE ACCOUNTS
The Electric Revenue Fund and the Electric Improvement & Extension (I&E) Fund are the City’s
two funds devoted to the Electric Division. The funds are used to manage cash and transactions
related to utility operations and capital expenditures, respectively. Each fund includes certain
City of Dover, Delaware 4-9 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 52
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
cash accounts established to make moneys available for specific purposes when they are needed.
The accounts maintained within the Revenue and I&E Funds are listed herein.
Electric Revenue Fund Electric Improvement & Extension Fund
• Insurance Reserve Account • Depreciation Reserve Account
• Contingency Reserve Account • Future Capacity Reserve Account
• Electric Rate Stabilization Reserve
Account
• Interest and Sinking Account
City of Dover, Delaware 4-10 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 53
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
Table IV-7
SCHEDULE OF INSURANCE COVERAGE IN EFFECT
City of Dover Electric Division
July 1, 2012 -
Starr Technical Risks Agency June 30, 2013
Coverage
Property
Earth Movement -Per Occurrence and in the $20,000,000
Annual Aggregate, except
Earth Movement in High Hazard Earth Movement EXCLUDED
Zones;
Earth Movement in California; EXCLUDED
Flood -Per Occurrence and in the Annual 10,000,000
Aggregate;
Accounts Receivable; 100,000
Business Interruption; EXCLUDED
Contingent Time Element Coverage; EXCLUDED
Debris Removal (or 25% of Direct Property Loss, whichever the greater); 2,500,000
Demolition and Increased Cost of Construction; 10,000,000
EDP Media; 1,000,000
Errors and Omissions; 2,000,000
Expediting Expense; 1,000,000
Extra Expense, excluding replacement power or increased cost of generation, 2,000,000
transmission and/or distribution of electricity, water or natural gas;
Fire Department Service Charges and Extinguishing Expenses; 500,000
Hazardous Substances -Per Occurrence and in the Annual Aggregate; 500,000
Inland Transit; 2,500,000
Newly Acquired Locations -90 Days reporting; 1,000,000
Personal Property Temporarily Off Premises; 100,000
Professional Fees; 250,000
Incidental Course of Construction; 5,000,000
Miscellaneous Unnamed Locations (except perils of Flood, Earth Movement and 500,000
Valuable Papers and Records; 100,000
Deductibles
For each Occurrence giving rise to a claim under this policy, the Insured agrees to retain for its
own account an initial amount of:
In respect of Damage to Insured Property:
$350,000 per Occurrence, except;
$100,000 per Occurrence as respects Transit.
In respect of Time Element loss (Extra Expense):
45 days per Occurrence, except;
72 hours per Occurrence in respect of Service Interruption.
City of Dover, Delaware 4-11 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 54
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
Table IV-8
SCHEDULE OF INSURANCE COVERAGE IN EFFECT
City of Dover Electric Division
July 1, 2012 -
XL Insurance June 30, 2013
Coverage
Property
per Occurrence and in the Annual Aggregate in respect of Flood; $ 10,000,000
per Occurrence and in the Annual Aggregate in respect of Earth Movement, 20,000,000
Excluded. per Occurrence and in the Annual Aggregate applicable in
High Hazard Movement zones;
per Occurrence and in the Aggregate in respect Hazardous Substance; 500,000
per Occurrence in respect of Business Interruption; EXCLUDED
per Occurrence in respect of Accounts Receivable; 100,000
per Occurrence in respect of scheduled, direct Contingent Time Element; EXCLUDED
per Occurrence in respect of Incidental Course of Construction; 5,000,000
(or 25.00% of the direct physical loss, whichever greater) per Occurrence in 2,500,000
respect of Debris Removal;
per Occurrence in respect of Demolition and Increased Cost of Construction; 10,000,000
per Occurrence in respect of Electronic Data Processing Media; 1,000,000
per Occurrence in respect of Errors and Omissions; 2,000,000
per Occurrence in respect of Expediting Expense; 1,000,000
per Occurrence in respect of Extra Expense excluding replacement power of 2,000,000
increased cost of generation, transmission and/or distribution of electricity,
water or natural gas;
per Occurrence in respect of Fire Department Service Charges and 500,000
Extinguishing Expenses;
per Occurrence in respect of Newly Acquired Locations (ninety (90) days 1,000,000
reporting);
per Occurrence in respect of property in Course of Inland Transit; 2,500,000
per Occurrence in respect of Miscellaneous Unnamed Locations, except: 500,000
Excluded. per Occurrence in respect of Flood;
Excluded. per Occurrence in respect of Earth Movement;
Excluded. per Occurrence in respect of Named Storm;
per Occurrence in respect of Valuable Papers and Records; 100,000
per Occurrence in respect of Personal Property Temporarily Off Premise. 100,000
Deductibles / Retentions
For each Occurrence giving rise to a claim under this policy, the Insured agrees to retain for its
own account an initial amount of:
In respect of Damage to Insured Property:
$350,000, Per Occurrence, except;
$100,000, per Occurrence as respect Transit;
In respect of Time Element loss (Extra Expen
45 days per Occurrence except;
72 hours Per Occurrence in respect of Service Interruption
The following are descriptions of each Fund, their respective accounts and their purposes.
City of Dover, Delaware 4-12 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 55
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
4.4.1 Electric Revenue Fund
The Electric Revenue Fund was established in Section 503 of the Resolution. All revenues are to
be deposited into the Electric Revenue Fund when received. Current expenses are to be paid and
other accounts are to be maintained from the Electric Revenue Fund. Moneys are transferred
from the Electric Revenue Fund to the Electric Rate Stabilization Reserve Account, the Interest
and Sinking Account, the I&E Fund, the Depreciation Reserve Account, and the Future Capacity
Reserve Account.
4.4.1.1 Insurance Reserve Account: The Insurance Reserve Account was established by
the City to provide for the funding of insurance deductibles in the event of loss(es) covered by
the City’s insurance policies then in effect. The target minimum balance in the Insurance
Reserve is $350,000. The reserve balance at the end of FY 2012 was $407,995.
4.4.1.2 Contingency Reserve Account: The Contingency Reserve Account was established
by the City in FY 2003 to provide for unplanned expenditures that may not be avoidable. The
City’s Financial Policies require that a minimum balance be maintained in the Contingency
Reserve Account equal to 1.0 percent of the current year revenues for the Electric Revenue Fund.
The FY 2012 year-end balance was $1,070,814, which is equal to 1.13 percent of the FY 2012
revenues for the Electric Revenue Fund.
4.4.1.3 Electric Rate Stabilization Account: The Electric Rate Stabilization Reserve
Account was established in FY 2005 to offset the costs of the power cost adjustment to the
customers of Dover. The account’s target balance is a minimum of 3.0 percent, not to exceed
10.0 percent, of purchase power cost in any given year. Any excess of this amount will be
refunded to customers in future years by reducing the rate of the power cost adjustment. The
account’s FY 2012 end-of-year balance was $11,230,133, which was 14.5 percent of the FY
2012 purchased power cost.
4.4.1.4 Interest and Sinking Account: The Interest and Sinking Account was established in
Section 507 of the Resolution. This account consists of two restricted accounts: the Bond Service
account and the Reserve Account. The Bond Service Account is funded with equal monthly
transfers from the Electric Revenue Fund such that the balance, as of each payment date for
City of Dover, Delaware 4-13 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 56
2012 Engineering Consultant’s Report 4.0 – Financial Assessment
interest or for principal and interest, will be equal to the amount of the payment due. The
payments of principal and interest due on bonds are made from the Bond Service Account. The
Reserve Account is funded by transfers from the Electric Revenue Fund, as necessary, to
maintain a balance equal to the maximum combined principal and interest for any future fiscal
year through the life of all bonds then outstanding. Moneys in the Reserve Account are used for
paying interest on and principal of bonds when the balance in the Bond Service Account is
insufficient for making those payments. Excess moneys in the Reserve Account are also used
towards paying current interest payments. The total amount in the Restricted Accounts for the
2008 and 2010 bonds as of June 30, 2012, was $3,522,833.
Electric Improvement and Extension Fund: The I&E Fund was established in
Section 507 of the Resolution. Funds are added to the I&E Fund from the Electric
Revenue Fund to the extent that the amount of funds available from the Electric
Revenue Fund exceeds the total of the amounts required to be added to the Interest
and Sinking Account. The I&E Fund also receives additional funding from the
Depreciation Reserve Account, the Future Capacity Reserve Account, and from
development receipts. Section 510 of the Resolution indicates that, except for certain
situations, moneys held in the I&E Fund are to be used only for payment of costs of
unusual maintenance or repairs, renewals or replacements, obtaining or replacing
equipment, constructing extensions, additions, or improvements, and engineering
expenses related to the foregoing activities.
4.4.1.5 Depreciation Reserve Account: The Depreciation Reserve Account represents
moneys that have been set aside for the sole purpose of funding renewals and replacements of the
Electric System as components or equipment wear out, deteriorate, or otherwise become
unsuitable for the intended purpose. Transfers from the Electric Revenue Fund and investment
earnings are the only sources of additional moneys for the Depreciation Reserve Account.
Transfers to the I&E Fund are made as necessary to fund capital projects. The target
appropriation for the Depreciation Reserve Account each year is the excess of depreciation
expense for the year over the amount of principal included in debt service payments made during
the year. The reserve balance at the end of FY 2012 was $10,542,058.
4.4.1.6 Future Capacity Reserve Account: The Future Capacity Reserve Account was
established to set aside and accumulate funds from the Electric Revenue Fund for use in
evaluating and pursuing activities related to the Electric Division’s alternatives for power supply
City of Dover, Delaware 4-14 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 57
SECTION 5 – CONCLUSIONS
Página 58
2012 Engineering Consultant’s Report 5.0 - Conclusions
5.0 CONCLUSIONS
In the preparation of this Engineering Consultant’s Report, Burns & McDonnell completed
assessments of the electric generating stations and the transmission and distribution system of the
City Electric Division. The investigations included interviews, observations, and reviews of FY
2012 expenditures and FY 2013 budgets. In addition, an analysis of the balances of the
Improvement and Extension Fund and other funds benefiting the Electric Division was
performed. Burns & McDonnell also reviewed the adequacy of the revenues provided by the
current retail rates in relation to the requirements of the City of Dover, Delaware Resolution
Authorizing and Securing Electric Revenue Bonds, adopted December 23, 1985. A high level
assessment of the City’s insurance coverage related to the Electric Division was also completed.
Based on these reviews and assessments, it is Burns & McDonnell’s opinion that:
1. The City’s power generation facilities are being operated and maintained consistent with
accepted electric utility practice in the United States.
2. The design, construction, operation, and maintenance of the City's electric transmission and
distribution system and the associated facilities are consistent with current generally accepted
electric utility standards and over the past few years. The system has been upgraded in order
to improve operation and service to customers.
3. The Electric Division capital projects included in the City’s Capital Investment Plan and the
FY 2013 Operating Budget are necessary and should provide improved reliability and power
quality for the Electric System.
4. The balances as of June 30, 2012 for the various reserve funds maintained by the City for the
Electric Division appear to be sufficient for their defined purposes.
5. The insurance coverage in full force and affect as maintained by the City related to the
various assets of the Electric Division appears to satisfy the requirements of Section 706 of
the Resolution.
6. The electric revenues generated by the City’s current retail rates are more than sufficient to
fulfill the debt service coverage requirement defined in Section 502(c) of the Resolution.
*****
City of Dover, Delaware 5-1 Bur ns & McDonnell Engineering Company
Electric Division Kansas City, Missouri
Página 59
Burns & McDonnell World Headquarters
9400 Ward Parkway
Kansas City, MO 64114
Phone: 816-333-9400
Fax: 816-333-3690
www.burnsmcd.com
Burns & McDonnell: Making our clients successful for more than 100 years