Anexo

Utility Committee. 27 de agosto de 2012.

Abrir el PDF

Este texto se extrajo de el PDF de forma automática y puede contener errores. El PDF es el registro oficial, así que consúltelo antes de confiar en esto.

3 páginas tienen poco o ningún texto legible aquí, a menudo por ser escaneos o dibujos. Para verlas, consulte el PDF.

Página 1

UTILITY COMMITTEE AGENDA AUGUST 27, 2012 - 5:30 P.M. CITY HALL COUNCIL CHAMBERS 15 LOOCKERMAN PLAZA DOVER, DELAWARE Public comments are welcomed on any item and will be permitted at appropriate times. When possible, please notify the City Clerk (736-7008 or e-mail at CityClerk@dover.de.us) should you wish to be recognized. AGENDA ADDITIONS/DELETIONS 1. Annual Review and Approval of Governing Policy For Energy Commodity Risk Management (Deferred by Committee on August 13, 2012 Pending Further Information) 2. Updates A. Green Energy Funding and Programming B. Garrison Oak Technical Park Project 3. Adjournment by 5:55 P.M. /tm S:\AGENDAS-MINUTES-PACKETS\Committee-Agendas\2012\08-27-2012 UTILITY.wpd THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.

Página 2

Memorandum Office of the City Manager PO Box 475 Dover, DE 19903 Phone: (302) 736-7005 FAX: (302) 736-7002 E-mail: skoenig@dover.de.us To: Utility Committee Members From: Scott D. Koenig, P.E. City Manager Date: August 21, 2012 Subject: Annual Review and Approval of Governing Policy for Energy Commodity Risk Management These are the supplemental documents requested during the August 13, 2012 Utility meeting.  2 pages from the 2011 Comprehensive Annual Financial Report for the City of Dover  Counterparty Credit Risk  Dover Monthly Credit Report for August 2012  Annual Review and Approval of Governing Policy for Energy Commodity Risk Management (Provided at the August 13, 2012 Utility meeting and included in this packet again)

Página 5

Counterparty Credit Risk As of 6/29/2012 Counterparty Exposure with Dover @ 97.5% Confidence Level ($000) Counterparty Credit Counterparty CounterParty 1 Threshold High Price 10 High Price 90 Collateral Due Collateral Due Collateral Due Exposure Credit Rating ($000) Day Day (M2M) (10 Day) (90 Day) Barclays Bank, PLC (2,975) A 15,000 (2,765) (1,193) - - - BP Energy Company - BBB+ 15,000 - - - - - Constellation Energy Commodities Group, Inc. (11,270) BBB 30,000 (10,717) (7,946) - - - DB Energy Trading, LLC (4,295) A 15,000 (4,118) (2,659) - - - EDF Trading North America, LLC (245) A- 18,000 (188) (75) - - - Integrys Energy Services, Inc. (7,368) BBB+ 10,000 (7,226) (5,113) - - - Macquarie Energy, LLC (1,411) A 15,000 (1,336) (646) - - - Morgan Stanley Capital Group, Inc. (762) BBB+ 10,000 (647) (416) - - - NextEra Energy Power Marketing, LLC. (5,170) A- 10,000 (4,815) (2,782) - - - Public Service Electric and Gas Company - BBB 1,000 - - - - - Sempra Energy Trading LLC - BBB+ 15,000 - - - - - Total (33,496) 154,000 (31,811) (20,830) - - - Dover Exposure with Counterparty @ 97.5% Confidence Level ($000) Reverse City Of Dover Dover Threshold CounterParty Credit Credit Rating ($000) Low Price 10 Low Price 90 Collateral Due Collateral Due Collateral Due Exposure Day Day (M2M) (10 Day) (90 Day) Barclays Bank, PLC 2,975 A+ 15,000 3,309 3,497 - - - BP Energy Company - A+ 20,000 - - - - - Constellation Energy Commodities Group, Inc. 11,270 A+ 30,000 12,326 14,195 - - - DB Energy Trading, LLC 4,295 A+ 15,000 4,803 5,419 - - - EDF Trading North America, LLC 245 A+ 18,000 301 414 - - - Integrys Energy Services, Inc. 7,368 A+ 15,000 7,903 8,314 - - - Macquarie Energy, LLC 1,411 A+ 15,000 1,520 1,570 - - - Morgan Stanley Capital Group, Inc. 762 A+ 15,000 878 1,109 - - - NextEra Energy Power Marketing, LLC. 5,170 A+ 13,000 6,291 8,306 - - - Public Service Electric and Gas Company - A+ 12,000 - - - - - Sempra Energy Trading LLC - A+ 27,000 - - - - - Total 33,496 195,000 37,330 42,823 - - - 1. If applicable converted to S&P equivalent

Página 6

Dover Monthly Credit Report for August 2012 Collateral Utilization Report Available Counterparty Current and Prompt Month Discounted Forward MTM Collateral Total Exposure Credit Threshold Credit Barclays Bank, PLC ($46,400) ($1,869,169) $0 ($1,915,569) $15,000,000 $13,084,431 BP Energy Company $0 $0 $0 $0 $20,000,000 $20,000,000 Constellation Energy Commodities Group, Inc. ($569,448) ($8,692,278) $0 ($9,261,726) $30,000,000 $20,738,274 DB Energy Trading, LLC ($276,896) ($2,952,161) $0 ($3,229,057) $15,000,000 $11,770,943 EDF Trading North America, LLC $0 ($247,563) $0 ($247,563) $18,000,000 $17,752,437 Integrys Energy Services, Inc. ($383,556) ($4,751,721) $0 ($5,135,277) $15,000,000 $9,864,723 Macquarie Energy, LLC $0 ($896,493) $0 ($896,493) $15,000,000 $14,103,507 Morgan Stanley Capital Group, Inc. $0 ($732,327) $0 ($732,327) $15,000,000 $14,267,673 NextEra Energy Power Marketing, LLC. ($471,756) ($3,547,783) $0 ($4,019,539) $13,000,000 $8,980,461 Public Service Electric and Gas Company $0 $0 $0 $0 $12,000,000 $12,000,000 Sempra Energy Trading LLC $0 $0 $0 $0 $27,000,000 $27,000,000 ($1,748,056) ($23,689,494) $0 ($25,437,550) $195,000,000 $169,562,450 Exposure by Fiscal Year Counterparty Current and Prompt Month FY 2013 FY 2014 FY 2015 FY 2016 Current Report Compare Report Barclays Bank, PLC 0.3% 4.6% 7.8% 0.0% 0.0% 12.8% 17.2% BP Energy Company 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Constellation Energy Commodities Group, Inc. 1.9% 16.8% 10.1% 2.1% 0.0% 30.9% 30.0% DB Energy Trading, LLC 1.8% 13.4% 6.3% 0.0% 0.0% 21.5% 22.3% EDF Trading North America, LLC 0.0% 0.0% 0.0% 1.4% 0.0% 1.4% 1.2% Integrys Energy Services, Inc. 2.6% 31.7% 0.0% 0.0% 0.0% 34.2% 38.6% Macquarie Energy, LLC 0.0% 0.0% 3.4% 2.5% 0.0% 6.0% 7.9% Morgan Stanley Capital Group, Inc. 0.0% 0.0% 0.0% 0.0% 4.9% 4.9% 6.8% NextEra Energy Power Marketing, LLC. 3.6% 11.3% 5.7% 10.0% 0.2% 30.9% 28.9% Public Service Electric and Gas Company 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Sempra Energy Trading LLC 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Página 7

City of Dover, Delaware Governing Policy For Energy Commodity Risk Management Effective: Approved by: Date:

Página 8

TABLE OF CONTENTS PURPOSE OF THE RISK MANAGEMENT POLICY ..................................................................3 A. Introduction ....................................................................................................................3 B. Scope of Policy ................................................................................................................3 C. Objectives and Risk Philosophy ...................................................................................4 D. Policy Administration....................................................................................................4 MANAGEMENT AND CONTROLS .............................................................................................4 A. Utility Committee of The City Council .......................................................................5 B. Executive Risk Management Committee ....................................................................5 1. City Manager .............................................................................................................................. 6 2. Director of the Utility................................................................................................................. 7 3. Controller .................................................................................................................................... 7 4. TEA Member Services Manager .............................................................................................. 7 DISCUSSION OF RISKS ...............................................................................................................8 MARKETING AND TRADING PRACTICES ..............................................................................9 A. Standards of Conduct ....................................................................................................9 B. Products, Activities and Limitations ...........................................................................9 C. Contract Documentation and Confirmations...........................................................10 D. Training..........................................................................................................................10 E. New Product Protocol .................................................................................................10 RISK LIMITS AND RISK MEASUREMENTS ...........................................................................11 A. Limits..............................................................................................................................11 1. Volume/Maturity/Value Limits ........................................................................................... 11 B. Stress Testing and Back Testing .................................................................................12 C. Instances of Exceeding Risk Limits............................................................................12 CREDIT POLICY ..........................................................................................................................12 A. Measuring Credit Risk .................................................................................................12 B. Analysis and Extension of Credit Limits ..................................................................13 C. Instances of Exceeding Credit Limits ........................................................................13 REPORTING .................................................................................................................................14 A. Risk Reporting ..............................................................................................................14 B. Credit Reporting ...........................................................................................................15 C. Hedge Effectiveness Reporting ..................................................................................15 INFORMATION TECHNOLOGY SYSTEMS ............................................................................15 POLICY DISTRIBUTION AND COUNSEL ...............................................................................16 A. Distribution Outside The City ....................................................................................16 B. Designated Counsel .....................................................................................................16 APPENDIX A – Approved Products .............................................................................................16 APPENDIX B – Approved Counterparties and Threshold Tables ................................................17 APPENDIX C – Business Risks ....................................................................................................21 APPENDIX D – Glossary ............................................................................................................21 2

Página 9

PURPOSE OF THE RISK MANAGEMENT POLICY A. Introduction The City of Dover (“City”) and its customers are routinely exposed to energy price risk, volume variability risk, basis risk and credit risk – herein referred to collectively as energy commodity risk - in the normal conduct of serving its electric load requirements. Volatility of energy commodity prices and volumetric uncertainty (either supply/generation or load obligations) impose a substantial and direct risk to the City’s financial and operating performance. By authority of its charter, the City has responsibility for overseeing the City’s electricity operations, including the management of its cost of serving Dover’s customers. By agreement dated May 6, 2011 and approved by the City (the “EMA”), the City has engaged The Energy Authority, Inc. (“TEA”) to assist the City with Asset Management and Strategic Planning Services, Risk Management Services, and Energy Management Services. This Policy for Energy Commodity Risk Management (“Policy”) is established the explicit understanding that the City has retained and delegated responsibilities to TEA to provide Risk Management Services. Additionally, the City has issued this Policy for dealing with the philosophy, framework and delegation of responsibilities necessary to govern activities related to Dover’s energy commodity risk management. As set forth herein, the City has established an organizational structure, delegated responsibility and established internal controls and procedures to ensure that all transactional and oversight activities are conducted in compliance with this Policy and in accordance with the City’s normal reporting, legal, financing and regulatory requirements relating to energy assets and transactions. B. Scope of Policy This Policy covers all transactions entered into the by the City of Dover designed to meet the City’s electric load requirement and the management of risk related to these transactions. In the event of conflict between this Policy and the EMA, the Policy shall control. This Policy is separate and distinct from enterprise risk management policies and procedures addressing the City’s safe operation of its generating stations and energy infrastructure, insurance requirements, permit compliance, employee matters regulatory compliance with laws and regulations of the State of Delaware and Federal 3

Página 10

Agencies such as EPA, FERC, NERC and CFTC or other potential risks to the City beyond the purchase and sale of fuel and electric power and its ancillary products. C. Objectives and Risk Philosophy The objectives of the Policy are to identify energy commodity price and credit risk exposures and give the City a framework for the quantification and management of these exposures. The Policy will identify the reports needed to convey how the identified risk exposures can potentially impact the City’s overall cost of providing electricity service to its customers and report on the risk management of the transactions associated with City’s electric load requirements. Under the Policy, risk management activities will be conducted consistent with the City’s overall objective of appropriate risk mitigation. There are several objectives of the Policy which, when taken and executed together, serve to manage the City’s energy commodity price exposures. Specifically, the Policy: • Establishes framework for developing credit limits for counterparties and quantifies and manages the credit exposures related to potential counterparty abrogation • Quantifies the impact of the above exposures on City’s financial results • Manages the impact of the above exposures in line with the City’s identified level of risk tolerance • Provides clear delineation of responsibilities and authority, outline a separation of duties, and ensure reporting of risk is timely and accurate. • Ensures that the impact of any action affecting the City’s position is consistently quantified, monitored and authorized. The City’s risk management activities will be conducted consistent with its overall objective of appropriate risk mitigation and never for purposes of speculation. D. Policy Administration This Policy has been approved by the Executive Risk Management Committee and The Utility Committee of the Dover City Council. The Utility Committee must approve modifications to the Policy with the exception of the appendix information which can be modified with the approval of the Executive Risk Management Committee. MANAGEMENT AND CONTROLS This Policy articulates the management and organization of the City and TEA to serve as a control framework outlining delegation of duties and responsibilities. 4

Página 11

A. Utility Committee of The City Council The Utility Committee of The City Council (The Committee) has a responsibility to provide approval of this Policy. With this approval, The Committee also assumes additional duties. They will understand the risks the City is and could be exposed to due to their energy commodity risk management activities. In this role, the Committee will have a responsibility to also understand the City’s policies and procedures, internal controls and systems which are used to help manage the City’s energy commodity risks. The Committee will approve any amendments to the Policy or limits within. The Executive Risk Management Committee will update the Committee periodically regarding the Policy and its functions. It will be the Committee’s responsibility to: • Discuss guidelines and strategic policies that govern the process by which the Energy Risk Management Committee assesses and manages risks • Review and approve the risk policy at least annually • Approve new members of the Executive Risk Management Committee • Acknowledge the risk inherent in transactions covered under this Policy B. Executive Risk Management Committee An Executive Risk Management Committee (“ERMC”) has been formed to provide executive management oversight for the City’s energy commodity risk management activities. The ERMC is charged with the creation, amendment and administration of this Policy, including acquiring any approvals required by the Utility Committee, and will ensure that all energy commodity risk management activities of the City are performed consistent with this Policy. The ERMC will meet at least monthly to review compliance and conduct its business as described in this Policy. The ERMC shall be comprised of the following voting members: The City Manager, The Director of Utility, The City’s Controller and TEA’s Member Service Manager. The City’s ERMC will make decisions following the process outlined in this Policy. TEA’s Member Services Manager may include representatives from other areas within TEA in the monthly ERMC meetings who will attend in person or by conference call as non-voting advisors. Other City employees and TEA staff may also be asked to attend meetings from time-to-time, as the ERMC deems necessary. The responsibilities of the ERMC shall include: • Establish scope and frequency for management reporting to the Utility Committee. • No less than annually, review the City’s Energy Commodity Policies and Procedures for correctness and completeness. 5

Página 12

• Review and approve any new risk report or change to an existing risk report provided by TEA to monitor risks outlined in this Policy. • Understand and approve any models, methodologies, and assumptions used for measuring risks such as volume risk, process risk, counterparty risk and commodity risk. • Monitor the City’s risks and ensure they are within the limits and are being managed according to what is indicated within the City’s Policy and associated procedures • Understand the City’s risk management objectives and risk tolerances. • Review and approve the risk management and trading strategy programs and associated risk. Each program should be reviewed to ensure alignment with Policy objectives and compliance with risk limits within this Policy. • Periodically review any risk management program approved in light of recent market changes, and ensure continued compliance with its established guidelines • Review and approve new products, markets, trading counterparties and credit limits • Review all violations and exceptions to this Policy and report such to the Committee. • Approve the individuals or companies that engage in the City’s commodity transactions and are subject to the limits within this Policy. • Ensure that the individuals or companies authorized to transact on behalf of the City as well as manage its risks, are appropriately trained and qualified. • Ensure independence and segregation of duties between front, middle and back office at TEA. Recommend changes to this Policy to the City’s Utility Committee for approval and ensure the Utility Committee understands the City’s overall compliance with this Policy and associated procedures The ERMC will meet at least monthly to review risks identified and reported on by the Policy, this meeting shall be chaired by The City Manager. Minutes of each meeting of the ERMC shall be recorded and reflect any decisions and follow-up action items to be performed. These minutes will be reviewed and approved by the members of the ERMC in a timely manner. Each member of the ERMC has a unique role as defined below: 1. City Manager The City Manager is independent of all commercial functions and carries the responsibility of establishment and maintenance of risk management for the City. The City Manager will be a voting member of the ERMC and act as a chair of the ERMC. Other responsibilities include: • Ensure this Policy is maintained. 6

Página 13

• Oversee reviews of the City’s energy commodity risks, limits, risk measurement methodologies and models, and programs and recommend changes to the ERMC. • Ensure potential transactions and their impacts on the City’s risks and limits defined within this Policy. • Develop and monitor the implementation of the Policy, and oversee other risk management processes and procedures established by this Policy or otherwise by the ERMC. 2. Director of the Utility The Director of the Utility is responsible for all trading, hedging, pricing, structuring, and market and operational risk management activities associated with the City. The Director of the Utility will be a voting member of the ERMC. Other responsibilities include: • Review the effectiveness of transaction processing systems and procedures relating to risk measurement. • Recommend operational risk and business risk assessment guidelines. 3. Controller The Controller is independent of all commercial functions and carries the responsibility of the City’s accounting practices. The Controller will be a voting member on the ERMC. Other responsibilities include: • Perform financial accounting including accounting for hedging and derivatives activities. • Comply with tax rules and make appropriate tax elections. • Record realized and unrealized gains and losses. • Reconcile general ledger, cash transactions and margin accounts. • Implement tax-hedge accounting policies and other regulatory tax requirements. • Develop and maintain documentation outlining standard procedures for conducting business. • Invoice counterparties and resolve billing disputes. • Perform daily/weekly/monthly transaction checkout with counterparties. • Develop and maintain documentation outlining standard procedures for conducting business. 4. TEA Member Services Manager The TEA Member Service Manager roles and responsibilities are defined exhibit B of the EMA between the City and TEA. The TEA Member Service Manager will be a voting member on the ERMC. Other responsibilities include: 7

Página 14

• Monitor risk reports between ERMC meetings. • Report to the Committee and the ERMC on the City’s adherence to all limits and functions within this policy. • Engage the ERMC in discussions regarding events or developments that could expose the company to potential losses. • Recommend to the ERMC specific risk limits consistent with the City’s risk management objectives, risk tolerance, and risk management policy. • Coordinate and distribute independent market fundamental analysis. • Provide advisory support and recommendations as specified in Article 5 of the EMA. DISCUSSION OF RISKS This Policy covers the management of all material energy market risks faced by the City. A comprehensive list of risks that are or could be relevant to City is shown in Appendix C of the Policy. Among the most critical of these risks are commodity risk, counterparty risk, process risk, volume risk, and budget risk. These risks are measured by the limit structure and controls outlined in the Policy. Commodity risk represents the potential adverse impacts to the value of the City’s portfolio due to changes in the market. Commodity risk encompasses volatility risk, forward price risk, basis risk, correlation risk and liquidity risk. Counterparty risk represents the potential losses the City could incur due to delivery risk and receivable risk. Delivery risk stems from a supplier or trading counterparty that is unable or unwilling to perform on its commitments including but not limited to delivery or receipt of commodities. Receivable Risk includes the City’s risk associated with a counterparty’s timeliness of payment for services rendered. Process risks represents the risks associated with process problems including, but not limited to, inaccurate data capture, untimely trade execution or settlement problems. Controls over process risks are embedded in the organizational structure of TEA through the design processes and operating procedures. Volume Risk represents the potential for unforeseen changes from projections of excess or shortfall of capacity or energy from the actual needs. When variances are large coupled with large costs to transact and adverse moves in market prices this risk could be realized. In management of this risk, the City must be aware of the fact that unexpected variations in volume are often highly correlated with price movements. 8

Página 15

Budget Risk represents the potential to deviate outside of tolerable bounds of the City’s budget. Deviations from budget can be caused by forecast error or unforeseeable adverse changes in market prices. MARKETING AND TRADING PRACTICES A. Standards of Conduct Individuals authorized to transact for the City shall not misrepresent, conceal or withhold information regarding energy commodity trading and risk management transactions to any person responsible for the accurate recording and/or reporting of such transactions; participate in any such transaction or similar activity for the benefit of any party other than the City; or hold or be a beneficiary of any financial interest in any entity with which the employee is engaged in trading or other business activity (other than ownership of an interest in a mutual fund managed by another party). Further, no employee authorized to place or execute such transactions may engage in trading power or energy commodities derivative instruments for his or her personal account. B. Products, Activities and Limitations Pursuant to achieving the City’s core objectives for the purpose of energy commodity risk management, the following limitations shall apply. • Permissible instruments will be restricted to the products and instruments specified in Appendix A – Approved Products of the Policy; o All physical forward transactions shall be governed by the Edison Electrical Institutive (EEI), North American Energy Standards Board (NAESB), or similar agreements with counterparties approved by the City. o The City reserves the right to enter into financial hedge transactions to effectuate Policy objectives, but does not authorize TEA to enter into financial hedge transactions on its behalf. Any such financial transactions that the City may enter into shall be governed by ISDA agreements with counterparties as approved by the City. • The maturity for each permissible instrument will be restricted to the maturity limits specified in the risk limits section of the Policy. • Transaction volumes for each risk management transaction will be restricted to the amounts specified in the Risk Limits section of the Policy. • Risk management transactions will be outlined in the City of Dover Hedge Program which will be approved by the ERMC. Risk management transactions may include the following: o Hedging the forward price of purchased power for delivery to the City as needed to meet its electric load requirements. 9

Página 16

o Hedging the forward price of natural gas and fuels as needed to generate power to meet the City’s electric load requirements. o Unwinding of hedges to accommodate changes in expected load requirements, or for economic reasons subject to explicit constraints set by the ERMC. C. Contract Documentation and Confirmations No over-the-counter transaction may be executed until an EEI, NAESB, or similar agreement has been authorized by the City, approved by the ERMC and fully executed by the parties. Written confirmations will be required from counterparties, as defined in the Master Service Agreement between the City and counterparty, within one business day or such longer time as required by the contract in question for all risk management transactions. Contemporaneous with any commitments and prior to receipt of written confirmations, verbal commitments shall be memorialized internally as to instrument structure, quantity, relevant time horizon, price and any other relevant terms; such internal documentation shall be time stamped and correlated to the ultimate written confirmation to or from the counterparty. Both the internal documentation as well as the written confirmation from the counterparty shall be provided to TEA’s Risk Control Group immediately upon receipt for verification. In the event that there is a material failure to provide timely documentation or confirmations, then at the City Manager’s sole discretion, the offending individual’s authorization may be suspended. Similarly, if the failure to provide timely documentation or confirmations is due to the failure of counterparty, then at the discretion of the City Manager, a moratorium may be imposed on transactions with that counterparty. In such cases, the City Manager shall notify the ERMC of the issues leading to the suspension or moratorium shall. Nothing herein shall inhibit the City Manager from bringing control issues to the TEA’s Member Services Manager prior to a decision on materiality or the imposition of a suspension of trading privileges or counterparty moratorium. D. Training The ERMC will ensure that all City employees and/or TEA Staff that will execute transactions on behalf of the City will have appropriate training in the markets in which the transactions occur. E. New Product Protocol 10

Página 17

As required to manage the City’s energy commodity risk the ERMC shall approve new products provided the requirements of the New Product Approval Procedure are met. RISK LIMITS AND RISK MEASUREMENTS A. Limits The limit structure is designed to quantify the types of risk in City’s energy commodity portfolio. The City will manage and report on its energy commodity market risk using Volume/Maturity/Value Limits, a Cost of Service Limit and a Hedge Loss Limit. 1. Volume/Maturity/Value Limits Transaction limits for the Individuals Authorized to execute transactions and the maturity limits for each permissible instrument are listed below. Transactions for amounts in excess of those listed may be executed only upon approval of the ERMC. This limit, maturity and value structure is not intended for use when transacting day- ahead and real time in the PJM market. Maximum Daily Notional Limits Volume/Maturity/Value Limits Volume Value ($000) Balance of the Month through 12 Months 50 20,000 Power Between 13 Months and 24 Months 50 20,000 (MW) Between 25 Months and 36 Months 25 10,000 Hourly Limit Between 37 Months and 48 Months 25 10,000 Between 49 Months and 60 Months 25 10,000 Balance of the Month through 12 Months 30,000 400 Natural Gas Between 13 Months and 24 Months 30,000 400 (MMBtu) Between 25 Months and 36 Months 10,000 200 Monthly Limit Between 37 Months and 48 Months 10,000 200 Between 49 Months and 60 Months 10,000 200 Balance of the Month through 12 Months 6,000 400 #2/#6 Fuel Oil Between 13 Months and 24 Months 6,000 400 (Bbl) Between 25 Months and 36 Months 3,000 200 Monthly Limit Between 37 Months and 48 Months 3,000 200 Between 49 Months and 60 Months 3,000 200 The amounts in the table above refer to the maximum volume of orders that can be placed in any one day the individuals authorized to conduct trades for the specified time period. On any one day the maximum transaction volume placed can be for up to 50 MegaWatts per hour for every hour during a single calendar month (including both on-peak and off-peak hours), OR 25,000 MMBtu per month for all months pertinent to the natural gas transaction, OR 6,000 Bbl per month for all months pertinent to the oil transaction. 11

Página 18

For no reason should a transaction be executed that exceeds the City’s electric load requirements. If there is an adjustment to the City’s electric load requirements and the existing transactions greater than 100% of the adjusted electric load requirements the ERMC will review and approve the offsetting strategy deployed in sufficient proportion to mitigate the encroachment. B. Stress Testing and Back Testing The City’s positions shall be periodically stress tested and models shall be back tested. The processes around these tests are outlined in the Stress Testing and Back Testing Procedure. C. Instances of Exceeding Risk Limits Should the City or TEA enter into a transaction that causes the portfolio to exceed any above mentioned limits the Director of the Utility shall, in addition to notifying the ERMC, also notify the Chair of The Committee as soon as practicable and shall provide periodic reports to the Chair on the status the transactions for as long as the City is exceeding its limits. The ERMC will review and determine whether any liquidation or offsetting of transactions is warranted. The incident will be documented as a Policy Exception by the Director of the Utility. CREDIT POLICY Credit Risk is the risk due to the uncertainty in a counterparty’s ability to meet its contractual obligations. The primary objective of this credit policy is to mitigate, to the extent commercially reasonable, the credit risks associated with transactions covered in this Policy while still allowing the City to achieve its objectives. A. Measuring Credit Risk The status of credit risk will be measured and reported through reports provided by TEA. The current credit exposure will be reported at the agreement level via a Counterparty Credit Report provided by TEA. This information will be made available in real time to TEA trading personnel so that it can be checked prior to executing transactions for the City. Those responsible for risk oversight at the City and TEA will have access to this information no less frequently than once per day. The ERMC will monitor overall credit utilization and any credit exceptions at least monthly. When measuring the current credit risk, netting will be applied to the exposure if the City’s contract with a counterparty includes provisions for netting. 12

Página 19

B. Analysis and Extension of Credit Limits Physical and financial commodity transactions will be executed with counterparties approved by the ERMC with credit available to support the transactions. The creditworthiness of a counterparty will be determined by both qualitative and quantitative factors. Factors shall include, but not limited to: • A company’s debt credit ratings provided by the rating agencies. • Financial data such as an analysis of the income statement, balance sheet, and cash flow, as well as liquidity and capital structure. • Subjective factors such as company’s fuel diversity, overall size, risk management policy and internal controls, geographic diversity, and market intelligence. A credit limit is the amount of unsecured credit granted to a counterparty. Unsecured credit exposure includes amounts owed by the counterparty, whether billed or not, and the mark-to-market differences in value of any collateral which the counterparty has provided the City. Any net exposure above the collateral threshold will require the posting of collateral by a counterparty. Further information on the City’s procedure for establishing credit is contained in the Counterparty & Credit Review Process. Collateral thresholds, term limitations and credit exposure limits will be subject to the maximums indicated in Appendix B, based upon the lower of the S&P and Moody’s credit ratings. At no time will the City incur a credit exposure with any counterparty greater than $60,000,000. C. Instances of Exceeding Credit Limits The City and TEA are restricted by the credit limits approved by the ERMC. The ERMC can suspend trading with a counterparty, if that counterparty’s credit limit has been reached or exceeded. The City or TEA traders shall not exceed the Counterparty Credit Limit by executing transactions with any counterparty without approval of the ERMC. The ERMC will determine when it’s appropriate to require additional collateral if a counterparty’s credit exposure exceeds its credit limit. Collateral includes standing letter of credit, cash, and prepayments. All credit exceptions will be documented and reported to the ERMC and the Committee as Policy Exceptions. 13

Página 20

REPORTING A. Risk Reporting Preparation of timely reports is critical to monitoring risk. TEA will furnish the required reports on a regular frequency for the City in a format acceptable to the ERMC. In addition, the ERMC and its designees will be provided access to the City’s risk reports as updated daily via TEA’s secure Web Portal. Reports required on a monthly basis and for periodic meetings of the ERMC include the following: • Profit and Loss Report The Profit and Loss (P&L) Report shows the daily realization of transactions at either the transaction price or the market price as transaction roll from unrealized to realized. This report should show volumes, transaction prices and market prices of realized physical and financial power and fuel transactions. • Mark to Market Report The Mark to Market (“MTM”) Report conveys the potential transaction exposure if the energy commodity portfolio was liquidated at the most recent market settlement prices. This report should show volumes, transaction prices and market prices of unrealized physical and financial power and fuel transactions. • Activity Report The Activity Report presents a summary of all energy commodity risk management activities undertaken, including new transactions taken, existing transactions settled/liquidated, and any transactions unwound. • Cost of Service Report The City’s exposure to energy price risk shall be monitored and reported on a Cost-of- Service basis. All calculations are at the wholesale level. The Cost-of-Service recognizes all prior (expired) months within the Power Year on the basis of actual (incurred) costs, and recognizes all forward (pending) months within the Power Year on the basis of expected forward power and fuel prices and expected forward load-following risks. As defined below, the Cost-of-Service is an aggregation of Forward Energy Commodity Portfolio Cost, the Load Following Cost Expectation and the City’s Budget Target for Purchase Power Expense. o The Net Purchased Power Cost shows the net cost of all physical and financial transactions related to the City’s anticipated commodity requirements for power and fuel and is based on the price of all hedge transactions plus the forward market price of all unhedged transactions valued at current forward prices for 14

Página 21

energy commodities, customer-level cost per MWH of all physical and financial transactions related to Dover’s actual plus anticipated energy. o The expected fixed costs defined as load-serving entity (LSE) capacity costs, transmission costs and TEA management fees. o The Expected Load-Following Cost for a specified power year is defined as the expected cost (or revenue) associated with intra-month load variations due to weather or other events affecting demand. As an interim measure due to lack of necessary market information and the rapid evolution of the PJM RTO market, the ERMC has specified $2.50 per MWH as an estimate of the Load Following Cost to be used for estimating the City’s Forward Cost-of-Service Report. The ERMC will update the Expected Load Following estimate while lack of necessary market information persists no less than annually. o The Budget Target for Purchase Power Expense represents the City’s view of expected purchase power expense. B. Credit Reporting • Counterparty Credit Report The Counterparty Credit Report conveys the exposure to all counterparties with which the City has credit exposure resulting from its energy commodity risk management activities. C. Hedge Effectiveness Reporting If the City’s transactions require a hedge effectiveness test, those testing results will be reported to the ERMC no later than one month after the end of the financial reporting period. The report will include a summary of testing methodology, assumptions of the testing and the outcome of results with a pass or fail by transaction. INFORMATION TECHNOLOGY SYSTEMS Since information systems play a vital role in The City’s trading abilities, the City shall ensure that the information systems and technology used to store all transaction information is maintained and secure. The City’s transactions will be stored in TEA’s enterprise trading and risk management system. TEA uses the TriplePoint Commodity XL (CXL) system, integrated with Commodity XL for Credit Risk (Credit Risk). TEA has assigned a Database Administrator (DBA) that is charged with the database security and maintenance for the transaction database, CXL. The following safeguards for data security and backup will be installed: • Transaction data stored in the system of record will be replicated daily to ensure data redundancy; 15

Página 22

• The CXL database will be backed up at least daily after the close of business. POLICY DISTRIBUTION AND COUNSEL A. Distribution Outside The City The City’s Policy is restricted to the use of the City and TEA organizations. It shall not be distributed outside these organizations without the consent the ERMC. B. Designated Counsel Questions about the interpretation of any matters of this Policy should be referred to ERMC. The ERMC will provide clarification and explanation on any updates to this Policy. All legal matters stemming from this Policy will be referred to the City’s Legal Counsel. APPENDIX A – Approved Products The following shall constitute a list of approved forward hedge products to be utilized by TEA to manage the City’s energy commodity portfolio: • Forward Physical Power Peak • Forward Physical Power Off-Peak • Forward Physical Power All Hours • Forward Physical Natural Gas Delivered Dover via Eastern Shore Pipeline • Forward Physical Residual Fuel Oil (#6) Delivered Dover • Forward Physical Residual Fuel Oil (#2) Delivered Dover • Capacity • Forward Financial Power Peak • Forward Financial Power Off-Peak • Forward Financial Power All Hours • Financial Call Option • Financial Put Option The above instruments can be executed by TEA on behalf of the City of Dover for the current and next two successive Power Years (July to June). 16

Página 23

APPENDIX B – Approved Counterparties and Threshold Tables This Appendix establishes approved counterparties and their Collateral thresholds. Collateral thresholds, term limitations and credit exposure limits that are subject to the following maximums based upon the lower of the S&P and Moody’s credit ratings: Credit Thresholds from Dover Extended to the Counterparty Constellation Energy Threshold S&P Moody's $ 60,000,000 AAA Aaa $ 50,000,000 AA- to AA+ Aa3 to Aa1 $ 50,000,000 A- to A+ A3 to A1 $ 40,000,000 BBB+ Baa1 $ 30,000,000 BBB Baa2 $ 20,000,000 BBB- Baa3 $ - Below BBB- Below Baa3 Integrys Threshold S&P Moody's $ 20,000,000 AAA Aaa $ 20,000,000 AA- to AA+ Aa3 to Aa1 $ 15,000,000 A- to A+ A3 to A1 $ 10,000,000 BBB+ Baa1 $ 5,000,000 BBB Baa2 $ 1,000,000 BBB- Baa3 $ - Below BBB- Below Baa3 Sempra Energy Threshold S&P Moody's $ 20,000,000 A or above A2 or above $ 20,000,000 A- to A+ A3 $ 15,000,000 BBB+ Baa1 $ 10,000,000 BBB Baa2 $ - BBB- or lower Baa3 or lower Conectiv Threshold S&P Moody's Unspecified * Above BBB+ Above Baa3 $ - Below BBB- Below Baa3 * Conectiv does not have a defined credit threshold, so for planning purposes, a $10,000,000 threshold is imposed as a conservative limit 17

Página 24

Macquarie Cook Power Threshold S&P Moody's $ 25,000,000 AAA Aaa $ 20,000,000 AA- to AA+ Aa3 to Aa1 $ 15,000,000 A- to A+ A3 to A1 $ 10,000,000 BBB+ Baa1 $ 5,000,000 BBB Baa2 $ - BBB- or below Baa3 or below FPL Energy Threshold S&P Moody's $ 30,000,000 AAA Aaa $ 25,000,000 AA- to AA+ Aa3 to Aa1 $ 20,000,000 A- to A+ A3 to A1 $ 15,000,000 BBB+ Baa1 $ 10,000,000 BBB Baa2 $ - BBB- or below Baa3 or below Deutsche Bank Threshold S&P Moody's $ 25,000,000 AAA Aaa $ 20,000,000 AA- to AA+ Aa3 to Aa1 $ 15,000,000 A- to A+ A3 to A1 $ 10,000,000 BBB+ Baa1 $ 5,000,000 BBB Baa2 $ - BBB- or below Baa3 or below Barclays Bank Threshold S&P Moody's $ 25,000,000 AAA Aaa $ 20,000,000 AA- to AA+ Aa3 to Aa1 $ 15,000,000 A- to A+ A3 to A1 $ 10,000,000 BBB+ Baa1 $ 5,000,000 BBB Baa2 $ - BBB- or below Baa3 or below 18

Página 25

Credit Thresholds from the Counterparty Extended to Dover Constellation Energy Threshold Fitch Moody's $ 40,000,000 AA- or Above Aa3 or above $ 30,000,000 A+ A1 $ 20,000,000 A A2 $ 10,000,000 A- A3 $ - BBB or below Baa1 or below Integrys Threshold Fitch Moody's $ 20,000,000 AAA Aaa $ 20,000,000 AA- to AA+ Aa3 to Aa1 $ 15,000,000 A- to A+ A3 to A1 $ 10,000,000 BBB+ Baa1 $ 5,000,000 BBB Baa2 $ 1,000,000 BBB- Baa3 $ - Below BBB- Below Baa3 Sempra Energy Threshold Fitch Moody's $ 27,000,000 A- or above A3 or above $ 5,000,000 BBB+ Baa1 $ 1,000,000 BBB Baa2 $ - BBB- or lower Baa3 or lower Conectiv Threshold Fitch Moody's Unspecified * Above BBB+ Above Baa3 $ - Below BBB- Below Baa3 *Conectiv does not have a defined credit threshold, so for planning purposes, a $10,000,000 threshold is imposed as a conservative limit 19

Página 26

Macquarie Cook Power Threshold Fitch Moody's $ 25,000,000 AAA Aaa $ 20,000,000 AA- to AA+ AA3 to Aa1 $ 15,000,000 A- to A+ A3 to A1 $ 10,000,000 BBB+ Baa1 $ 5,000,000 BBB Baa2 $ - BBB- or below Baa3 or below FPL Energy Threshold Fitch Moody's $ 23,000,000 AAA Aaa $ 18,000,000 AA- to AA+ AA3 to Aa1 $ 13,000,000 A- to A+ A3 to A1 $ 8,000,000 BBB+ Baa1 $ 3,000,000 BBB Baa2 $ - BBB- or below Baa3 or below Deutsche Bank Threshold Fitch Moody's $ 25,000,000 AAA Aaa $ 20,000,000 AA- to AA+ AA3 to Aa1 $ 15,000,000 A- to A+ A3 to A1 $ 10,000,000 BBB+ Baa1 $ 5,000,000 BBB Baa2 $ - BBB- or below Baa3 or below Barclays Bank Threshold Fitch Moody's $ 25,000,000 AAA Aaa $ 20,000,000 AA- to AA+ AA3 to Aa1 $ 15,000,000 A- to A+ A3 to A1 $ 10,000,000 BBB+ Baa1 $ 5,000,000 BBB Baa2 $ - BBB- or below Baa3 or below 20

Página 27

APPENDIX C – Business Risks APPENDIX D – Glossary 21

Página 28

FUND SUMMARY As of 8/16/2012 Total Collected $802,265.68 DEMEC Admin Fee Paid $31,061.04 State Admin Fee Paid $17,752.88 Grants Paid $506,767.00 Customer Only Grants/Fees Reserved and Amount Owed $35,433.63 Community Project Funds Requested $367,050.00 Energy Depot Paid $38,288.34 Efficiency Programs Paid $34,068.34 Solar Electric Power Association (SEPA) Fee $2,158.81 *Unencumbered Funds Available $3,282.07 Funding Shortfall Current Grant Payment Delay (Months) 0.0 * As of 08/16/2012 GRANTS PAID Grant Amount Review Fee Amount Date Grant Paid Applicant Type Paid Paid Owed 9/21/2007 Laura Drew Kelly Geo - Res $ 3,000.00 $ 225.00 $ - 12/5/2007 Domingo Reye Solar - Res $ 12,762.50 $ 750.00 $ - 4/16/2008 Lakeland Commercial Group Geo - Comm $ 10,800.00 $ 750.00 $ - 6/19/2008 & 08/25/2008 L.D. Shank - Triad Farms Solar - Comm $ 30,000.00 $ 750.00 $ - 10/6/2008 City of Dover Solar - Comm $ 40,820.00 $ 750.00 $ - 10/21/2008 Robert & Cynthia Hartman Geo HP- Res $ 1,800.00 $ 135.00 $ - 10/21/2008 Robert Varipapa Geo HP- Res $ 2,400.00 $ 180.00 $ - 2/27/2009 David Jump Solar - Res $ 15,000.00 $ 750.00 $ - 2/27/2009 Jakob Seren Solar - Res $ 15,000.00 $ 750.00 $ - 2/27/2009 William Sweet Solar - Res $ 15,000.00 $ 750.00 $ - 3/31/2009 LD Shank - Triad Farms Solar WH-Comm $ 3,000.00 $ 225.00 $ - 3/31/2009 Warren & Joan Seaver Geo HP- Res $ 3,000.00 $ 225.00 $ - 4/22/2009 William Sweet Solar HW $ 3,000.00 $ 225.00 $ - 4/28/2009 State of DE/DNREC - DE National Solar - Comm $ 30,000.00 $ 750.00 $ - 4/29/2009 Delaware Primary Care, LLC Solar - Comm $ 30,000.00 $ 750.00 $ - 9/11/2009 NCALL Solar - Comm $ 30,000.00 $ 750.00 $ - 9/11/2009 D. Brian Beckman Geo HP- Res $ 2,000.00 $ 150.00 $ - 9/21/2009 LKSC Dover, LLC Kids Cottage Solar - Comm $ 29,925.00 $ 750.00 $ - 10/5/2009 Mark F. Boller Geo HP- Res $ 3,000.00 $ 225.00 $ - 10/5/2009 John Welgan Solar - Res $ 15,000.00 $ 750.00 $ - 11/4/2009 LKSC Dover, LLC Kids Cottage Geo - Comm $ 12,000.00 $ 750.00 $ - 3/25/2010 Minaxi Patel Solar - Res $ 15,000.000 $ 750.000 $ - 3/23/2010 J. McGiffin Jr. & K. Doyle Geo HP- Res $ 3,000.000 $ 225.000 $ - 5/28/2010 Nancy Warner Geo HP- Res $ 1,200.000 $ 90.000 $ - 6/2/2010 David Teel Geo HP - Res $ 1,800.000 $ 135.000 $ - 6/2/2010 Dewey J. Barich Geo HP- Res $ 2,400.00 $ 180.000 $ - 7/12/2010 Mike & Sharonb Laverty Solar - Res $ 5,105.000 $ 382.880 $ - 8/19/2010 James Grilli Geo HP- Res $ 1,800.00 $ 135.000 $ - 8/19/2010 Michael Noble Solar - Res $ 15,000.000 $ 750.000 $ - 9/17/2010 David Teel Solar - Res $ 7,500.000 $ 562.500 $ - 3/8/2011 Michael & Carol Apgar Solar - Res $ 7,500.000 $ 562.500 $ - 3/17/2011 Elizabeth Murphey School Geo HP - Comm $ 9,200.000 $ 690.000 $ - 5/24/2011 Richard Avant Geo HP - Res $ 2,400.000 $ 180.000 $ - 6/23/2011 Charles Messina Plumbing Solar - Comm $ 10,000.000 $ 750.000 $ - 10/4/2011 Charles Bounds Geo HP - Res $ 1,800.000 $ 135.000 $ - 3/29/2011 Psychiatric Access Central DE Solar - Comm $ 13,187.500 $ 750.000 $ - 7/8/2011 Michael J. Kopp Geo - Res $ 2,300.000 $ 135.000 $ 37.50 10/17/2011 City of Dover ** Geo HP $ 48,267.000 $ - 3/7/2012 Ruth Ann Piper Geo - Res $ 1,200.000 $ 90.00 3/7/2012 Robert Hall Geo - Res $ 3,000.000 $ 225.00 3/7/2012 Elizabeth Murphey School Geo - Comm $ 13,800.000 $ 750.00 3/7/2012 Elizabeth Murphey School Geo - Comm $ 12,000.000 $ 750.00 3/7/2012 Elizabeth Murphey School Geo - Comm $ 5,400.000 $ 405.00 3/7/2012 Elizabeth Murphey School Geo - Comm $ 1,800.000 $ 135.00 3/7/2012 Elizabeth Murphey School Geo - Comm $ 10,200.000 $ 750.00 3/7/2012 Frank Daniels Geo - Res $ 4,400.000 $ 330.00 (**$$ still available for future apps.) Total $ 506,767.00 $ 17,752.88 $ 3,472.50 ARRA RELIEF GRANTS PAID 6/10/2011 Arturo Sanchez Solar - PV $ 7,500.00 10/19/2011 John Diamond Enterprise LLC Solar - PV - Com $ 30,000.00 10/19/2011 John Diamond Enterprise LLC Geo HP - Com $ 10,000.00 Total $ 47,500.00 PENDING APPLICATIONS Grant Reservation Status Applicant Type Request Review Fee Reservation Approved - Pending Completion ABRA Associates, LLC Solar - PV - Com $10,770.00 $750.00 Reservation Approved - Pending Completion Delaware Tech Solar - PV - Com $6,940.00 $520.50 Reservation Approved - Pending Completion Chong S. Tamburo-Lepage Geo - Res $2,300.00 $172.50 Reservation Approved - Pending Completion Christopher W. Los Geo - Res $3,000.00 $225.00 Reservation Approved - Pending Completion Dennis Ho Solar - Res $6,775.00 $508.13 Total $29,785.00 $2,176.13 ENERGY DEPOT FEES 3/3/2008 Start-up Fees $5,872.50 4/15/2008 Start-up Fees $1,957.50 4/15/2008 Mar, Apr, May 2008 $1,692.13 7/22/2008 June, July, Aug 2008 $1,692.13 10/10/2008 Sept, Oct, Nov 2008 $1,692.13

Página 29

1/2/2009 Dec 08, Jan, Feb 2009 $1,692.13 4/3/2008 Mar, Apr, May 2009 $1,692.13 7/1/2009 June, July, Aug 2009 $1,692.13 9/11/2009 Sept, Oct, Nov 2009 $1,692.13 1/4/2010 Dec 09, Jan, Feb 2010 $1,692.13 3/29/2010 Mar, April, May 2010 $1,692.13 6/30/2010 June, July, Aug 2010 $1,692.13 10/4/2010 Sept, Oct, Nov 2010 $1,692.13 1/3/2011 Dec 2010, Jan, Feb 2011 $1,692.13 4/5/2011 Mar, Apr, May 2011 $1,692.13 7/8/2011 June, July, Aug 2011 $1,692.13 10/4/2011 Sept, Oct, Nov, 2011 $1,692.13 1/3/2012 Dec 2011; Jan, Feb 2012 $1,692.13 4/5/2012 Mar, Apr, May 2012 $1,692.13 7/2/2012 June, July, Aug 2012 $1,692.13 Total Paid $38,288.34 ENERGY EFFICIENCY CAMPAIGNS/EDUCATION PROGRAMS 1,500 CFL Campaign & Educational 10/21/2008 Literature $5,012.29 12/11/2008 Reimbursement for Green $3,459.12 Thermal Imager for Home Audits 3/31/2009 Program $5,581.12 Eco @ Home Energy Conserv. 1/4/2011 Calendars $20,015.81 Total $34,068.34 Dover Library Commuity Grant Project Collections $5,021.15 1/2 of Oct 2009 GEF Payment $4,783.94 1/2 of Nov 2009 GEF Payment $4,813.23 1/2 of Dec 2009 GEF Payment $5,454.02 1/2 of Jan 2010 GEF Payment $5,147.49 1/2 of Feb 2010 GEF Payment $4,897.69 1/2 of March 2010 GEF Payment $3,976.14 1/2 of April 2010 GEF Payment $5,638.90 1/2 of May 2010 GEF Payment $5,645.35 1/2 of June 2010 GEF Payment $6,590.60 1/2 of July 2010 GEF Payment $7,786.09 1/2 of August 2010 GEF Payment $6,415.31 1/2 of Sept 2010 GEF Payment $5,327.96 1/2 of Oct 2010 GEF Payment $4,787.73 1/2 of Nov 2010 GEF Payment $4,939.75 1/2 of Dec 2010 GEF Payment $5,452.55 1/2 of Jan 2011 GEF Payment $5,410.35 1/2 of Feb 2011 GEF Payment $4,646.32 1/2 of March 2011 GEF Payment $4,742.22 1/2 of April 2011 GEF Payment $4,702.48 1/2 of May 2011 GEF Payment $5,664.97 1/2 of June 2011 GEF Payment $6,430.15 1/2 of July 2011 GEF Payment $6,916.50 1/2 of Aug 2011 GEF Payment $6,149.31 1/2 of Sept 2011 GEF Payment $5,243.92 1/2 of Oct 2011 GEF Payment $4,829.91 1/2 of Nov 2011 GEF Payment $4,531.81 1/2 of Dec 2011 GEF Payment $4,990.50 1/2 of Jan 2012 GEF Payment $5,071.81 1/2 of Feb 2012 GEF Payment $4,828.32 1/2 of March 2012 GEF Payment $4,857.07 1/2 of April 2012 GEF Payment $4,230.04 1/2 of May 2012 GEF Payment $5,711.19 1/2 of June 2012 GEF Payment $6,085.89 1/2 of July 2012 GEF Payment 1/2 of Aug 2012 GEF Payment 1/2 of Sept 2012 GEF Payment 1/2 of Oct 2012 GEF Payment 1/2 of Nov 2012 GEF Payment 1/2 of Dec 2012 GEF Payment $181,720.58 Total Collections Total Dover Lib. Draws to Date $48,267.00 10/17/2011 $133,453.58 Total Funds Available for Draw