CITY OF DOVER HISTORIC DISTRICT COMMISSION
REVISED AGENDA
THURSDAY, January 19, 2012 - 3:00 P.M.
City Hall – Conference Room
ROLL CALL
APPROVAL OF AGENDA
APPROVAL OF MINUTES OF MEETING on December 15, 2011
COMMUNICATIONS & REPORTS
1. Summary of Applications 2009-2011
2. Summary of Architectural Review Certifications for 2011
OLD BUSINESS
1. Finalization of Letter pertaining to Role of Historic District Commission
NEW BUSINESS
1. Request for Extension of Architectural Review Certification:
a. HI-11-01 Building at 326 West Loockerman Street: Building Demolition – Request
for one year extension of the Architectural Review Certification granted on
February 17, 2011 to allow Demolition of the existing commercial building at 326
West Loockerman Street. The property consists of one parcel of land zoned C-2
(Central Commercial Zone) and subject to the H (Historic District Zone) and
SWPOZ (Source Water Protection Overlay Zone). The property is located on the
southeast corner of West Loockerman Street and South Queen Street. The owner of
record is Dover Realty I. The property address is 326 West Loockerman Street.
Tax Parce1: ED-05-077.09-01-74.00-000.
2. Review of Building Permit Referred to Commission:
a. HI-12-01 Building Permit #12-0018 for Frankfurt Bakery at 323 South Governors
Avenue – Referral by the City Planner to the Historic District Commission for
Review of Architectural Review Certification for Building Permit application
#12-0018 for an exterior renovation project to the existing one story building and
site improvements. Property Owner: AJ Bakery LLC. Tax Parcel: ED-05-077.09-
04-46.00-000.
ONGOING PROJECTS
1. Project to Evaluate and Update the “Design Standards and Guidelines for the City of
Dover Historic District Zone”
ADJOURN
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO
CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSION.
Página 2
CITY OF DOVER
HISTORIC DISTRICT COMMISSION
DECEMBER 15, 2011
The Regular Meeting of the City of Dover Historic District Commission was held on Thursday,
December 15, 2011 at 3:00 PM with Chairman Scrafford presiding. Members present were Col.
Scrafford, Mr. McDaniel, Mr. Fisher, and Mr. Salkin. Mr. Jackson was absent.
Staff members present were Mrs. Melson-Williams, Ms. Cornwell, and Ms. Metsch.
APPROVAL OF AGENDA
Mr. McDaniel moved for approval of the agenda as submitted, seconded by Mr. Fisher and the
motion was unanimously carried 4-0 with Mr. Jackson absent.
ADOPTION OF MINUTES OF THE REGULAR HISTORIC DISTRICT COMMISSION
MEETING OF OCTOBER 20, 2011
Mr. Salkin moved to approve the minutes of the Regular Historic District Commission meeting of
October 20, 2011, seconded by Mr. McDaniel and the motion was unanimously carried 4-0 with
Mr. Jackson absent.
COMMUNICATIONS & REPORTS
Meeting and Deadline Schedule for 2012
Mrs. Melson-Williams stated that your meetings will remain on the third Thursday of the month
beginning at 3:00 PM. The application filing deadlines are also listed.
Mrs. Melson-Williams further stated that an item that was placed on your desk today is a training
opportunity by the Institute of Public Administration at the University of Delaware. They run a
series of these training seminars and January’s training opportunity is “Planning 101: Planning for
your Communities Future.” This is a morning class that will be held at the Paradee Center. The
topics of these training sessions are broader on zoning and land use; however, it is related to what
this Commission does.
OLD BUSINESS
DISCUSSION OF ROLE OF HISTORIC DISTRICT COMMISSION
Review of Draft Resolution/Letter pertaining to Role of Historic District Commission
Mrs. Melson-Williams stated that the Planning Staff received this letter this morning so you may
wish to pursue it or peruse it at your leisure or you can make changes today or defer it to another
meeting.
Mr. McDaniel questioned that if the Planning Staff received it today, who wrote it? Responding
to Mr. McDaniel, Mr. Salkin stated that he drafted it at the request of the Commission from the last
meeting. He was not sure if we were going to actually discuss it today as he thought there was
only going to be three (3) members present.
1
Página 3
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
Mr. McDaniel questioned if this was a timely matter that needed to be addressed today?
Responding to Mr. McDaniel, Mrs. Melson-Williams stated that you do not have to act on it today.
The Legislative, Finance and Administration Committee for the City of Dover does not meet again
until January 9, 2012.
Mr. McDaniel stated that he thought that the letter was fine and says what we want it to say.
Mr. McDaniel moved to submit the letter as written; however, he would like to see their names on
it noting that Mr. Jackson was absent from the meeting and that the Commission would receive his
concurrence on it, seconded by Mr. Fisher and the motion was unanimously carried 4-0 with Mr.
Jackson absent.
NEW BUSINESS
ANNUAL MEETING OF HISTORIC DISTRICT COMMISSSION
Election of Chairman and Vice Chairman
Mrs. Melson-Williams stated according to the By-Laws each November is considered your Annual
Meeting at which time you formally elect the officers of the Commission which is the Chairman and
Vice-Chairman and appoint a Secretary which traditionally has been the Planning Office Staff.
Mr. McDaniel stated that his concern with Mr. Jackson remaining Vice-Chairman with him not
being at this meeting is that the last time he was not present we unelected him from being Chairman.
Mr. McDaniel moved to nominate Mr. Richard Scrafford as Chairman and Mr. Charles Salkin as
Vice-Chairman, seconded by Mr. Fisher.
Mr. Fisher moved to close the nomination of officers, seconded by Mr. McDaniel and the motion was
unanimously carried 4-0 with Mr. Jackson absent.
Mr. Fisher moved to approve the nominations by acclamation, seconded by Mr. McDaniel and the
motion was unanimously carried 4-0 with Mr. Jackson absent.
Mr. McDaniel stated that the Planning Staff will act as the Secretary to the Commission.
Building at 22-24 West Loockerman Street – Presentation of Information on the proposed
Renovation project to the existing building at 22-24 West Loockerman Street owned by the
Downtown Dover Partnership. The renovation project involves proposed changes to the
Loockerman Street façade, changes to the North Street façade, and interior renovations to divide the
building into multiple spaces. Certain portions of the project are eligible for administrative review of
Architectural Review Certification during the Building Permit process; however, other project
aspects may require submission of an application for Architectural Review Certification review by
the Historic District Commission. The Historic District Commission requested an informational
presentation on this project as it is being designed and planned.
2
Página 4
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
Mrs. Melson-Williams stated that because Mr. McDaniel is a member of the Downtown Dover
Partnership who is the property owner for this item, he could remain in his seat. We can deal with
recusal later if necessary.
Mr. McDaniel asked that questions not be directed at him as there was ample representation from the
Downtown Dover Partnership that was present at the meeting.
Representatives: Mrs. Arden Bardol, Becker Morgan Group, Inc.; and Mr. Bill Neaton, Executive
Director of Downtown Dover Partnership.
Mrs. Melson-Williams stated that included in your packet is a memo and then a series of three (3)
colored drawings. The building renovation project located at 22-24 W. Loockerman Street on your
agenda today is presented for informational purposes. Back in your meeting in October there was
some questions raised regarding what was going on with the property. At that point, Staff reached
out to the design professionals working on the project and requested an information submission to
bring to the Commission. The memo that is included in your packet outlines the chronology to date.
Mrs. Melson-Williams further stated that staff has met with the project architect to discuss the
building renovation project on several occasions. From the Historic District Commission
standpoint, the property is located within the Historic District Zone and as such, any changes to the
exterior or affecting the exterior of the building are subject to Architectural Review Certification.
The Zoning Ordinance outlines the process and procedures for achieving Architectural Review
Certification. There are basically three ways. One way is through the Building Permit application
where Staff reviews the Architectural Review Certification. The second way is for certain types of
projects that are specified in the Zoning Ordinance where a formal application to the Historic
District Commission is made and reviewed by this Commission and takes final action on the
Architectural Review Certificate. The third way is a project that is of a much larger scale typically
those involving new construction of new buildings and requires a formal application to the Historic
District Commission which makes a recommendation and the final action occurs at the Planning
Commission for the Architectural Review Certification.
Mrs. Melson-Williams further stated that the meetings that Staff held with the design professional
have determined that the front façade part of the project would be eligible for a Building Permit
submission during which Staff could review the Architectural Review Certification. The Zoning
Ordinance allows for Staff to do that review for specific classes of Building Permits including
fences, siding, signs, window and door replacement, roofing and the addition or placement of
decorative features, minor demolition, residential additions, and other construction of a minor nature
that may be issued by the City Planner’s as part of the Building Permit process. Staff felt that what
we were hearing for the proposed project for the Loockerman Street side of the building clearly
could be done by Staff through Building Permit review.
Mrs. Melson-Williams further stated that the other parts of the project for the building also involve
what is the rear or the North Street façade. The project as described to Staff involves new door and
window openings, new exterior finishes, and changes to the wall itself on that side of the building.
Again, Planning Staff felt that if was certainly eligible for Architectural Review Certification
through the Building Permit process; however, Staff anticipated referring the permit to the
3
Página 5
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
Commission for your consultation which the Zoning Ordinance allows us to do. Staff felt that the
project scope, while still relatively minor, did involve some new elements; however, did not reach
the level of a full scale application to this Commission.
Mrs. Melson-Williams further stated that there has not been a Building Permit filed and this comes
to you as an informational item. If the Commission is comfortable with the feedback and
discussion that is held today, Staff will utilize that in our review of the permit should it come in for
both faces of the building both the Loockerman Street side as well as the North Street side of the
building which Staff would, in a different process, anticipate bringing to the Commission.
Mrs. Melson-Williams further stated that the interior of the building, while it is important to
understand what is happening on the outside, is not in the purvue of this Commission.
Mrs. Bardol stated that this past Monday they submitted a Building Permit. The construction
documents are done, the project has been bid, and the Partnership is anxious to move forward with
the project. A map indicating the project was provided and explained by Mrs. Bardol. On the
Loockerman Street side of the building currently has two storefront areas, one of which is more open
than the other with two sets of doorways. Their plan is to keep all the existing remaining brick on
the façade and at the header point, remove the entire storefront that is down below. The plan is then
to infill keeping two (2) distinct storefront areas. Infill would be with a setback from the street
similar to what it is in the existing condition with two (2) entry doors and storefront systems. The
Bel Boutique store has a recessed door and a storefront that is out from the face of the façade of the
building and that is what our intent would be here. They would also have some type of decorative
element that would be an applied treatment that would be out of the EIFS (Exterior Insulation
Finishing System) that allows an area for two (2) distinct signage locations on the front of the
building.
Mr. Salkin questioned if these doors are recessed? Responding to Mr. Salkin, Mrs. Bardol stated
that this is correct.
Mr. Salkin further questioned for the building area located to the right on this project, the western
storefront, is this what that building looked like when it was originally built or did it have a
completely different front with a single entrance? He was wondering what was there when it was
built. Responding to Mr. Salkin, Mr. Neaton stated that it was W.T. Grant’s back then and probably
had one entrance. As you walked through this door on the west side there were doublewide stairs
going down to the basement.
Mr. Scrafford questioned if there is a common egress on the east side that is accessed from the east
set of doorways. Where is that door in your plans? Responding to Mr. Scrafford, Mrs. Bardol
stated that on the diagonal piece of the drawing there will be another door rather than a fixed plate of
glass with the intent that it will blend in with the design.
Mr. Salkin stated that the east storefront would not have a display window. Responding to Mr.
Salkin, Mrs. Bardol stated that all it would have is small display light.
4
Página 6
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
Mr. Salkin questioned the reason for using EIFS rather than just mounting something or is there a
reason to physically attach this permanently to the brick as opposed to putting up something that
could be taken down later and something put in its place without destroying the original fabric?
Responding to Mr. Salkin, Mr. Neaton stated that given what the future of the building is or that it
may potentially be, your comment is well founded because they may not want to do that. This is
something, without committing to agree to, they should probably change to a temporary fixture as it
may hamper them in the future development of this building. This is something that they will take
under advisement.
Mrs. Bardol stated that with regards to the back of the building along North Street comprehensively,
this project was looked at as part of the Downtown Dover Partnership work that was involved with
the charette process with the MPO (Metropolitan Planning Organization) which was a study of
Downtown. This is one of the projects that was included in that study. The North Street Corridor
was suggested to be improved. With this back façade, it is setback from the street pretty far;
however, it is also a downtrodden elevation as it faces onto North Street. The notion was to try and
improve the visual aspects of the North Street Corridor. The proposal on the back side of the
building is to take the same vocabulary that is being done on the front of the building and match as
closely as possible a brick to the front to create a larger entry piece and then to re-skin the exterior.
The notion would be to apply an EIFS color with a scored texture pattern and then punch some
windows into that to allow light into that space.
Mr. Scrafford stated that there are not many architectural features on the North Street side of the
building. Responding to Mr. Scrafford, Mr. Neaton stated that what the Charette recommended
was along the North Street corridor that we attempt to make the backs of the buildings look more like
the fronts of the building and we will be the first project to do that. What also disappeared in this
project are the communication poles.
Mr. Scrafford further questioned what the access road would become between the fence on the left
and the parking lot on the right? Responding to Mr. Scrafford, Mr. Neaton stated that they picture
in the future as having some sort of canopy entrance way going back to that building.
Mrs. Bardol stated that as part of the Charette process and with the design concepts that were
presented, we are really trying to improve North Street.
Mr. Fisher questioned if there would be any parking? Responding to Mr. Fisher, Mr. Neaton stated
that there would be no parking necessary as you will see in the next presentation directly across the
street they are going to reconfigure the entire parking lot so that there will be ample parking for this
building.
Mr. Scrafford questioned if there is a tenant space #3 that can be accessed from Loockerman Street
or just from North Street? Responding to Mr. Scrafford, Mr. Neaton stated that currently it will be
both.
Mr. Scrafford stated that you have the common egress area that could be used as an access to a tenant
#3 and you also have the back to be used as an access to tenant #3. Are you required or do you
5
Página 7
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
intend to put any parking along that entrance so that people could get closer to the door or is your
plan not to do that? Responding to Mr. Scrafford, Mr. Neaton stated that their plan is not to do that.
Mr. Fisher questioned with regards to deliveries, if a tenant needs a bulk delivery would that have to
be done from across the street or from the street itself? Responding to Mr. Fisher, Mr. Neaton
stated that it would have to be done from the street the same way that it is done now. We do not
know who the tenants will be; however currently along Loockerman Street, most of the deliveries
are from the front of the building.
Mr. Salkin asked if they could make a motion to encourage Staff to proceed upon their own based on
the discussion today and then have a discussion at a later date on how we want to handle these
projects procedurally.
Mr. Fisher moved that if there are no substantially changes that this Commission would formally
approve of this project, seconded by Mr. Salkin and the motion was unanimously carried 3-0 with
Mr. Jackson absent and Mr. McDaniel recusing himself because he is a member of the Board of the
Downtown Dover Partnership which owns the property.
HI-11-05 North Street Area Improvement Project – Public Hearing and Review for
Recommendation to the City of Dover Planning Commission on the Architectural Review
Certificate for the North Street Area Improvement project. The project involves three project
areas/phases consisting of the following: a parking lot consolidation project on the south side of
North Street; streetscape improvements to the block of North Street between South State Street and
South Governors Avenue; and the redevelopment a vacant area in the block between North Street
and West Loockerman Street as a plaza with parking lot. The project area consists of multiple parcels
of land totaling 4.1635 acres ± of land zoned C-2 (Central Commercial Zone) or RGO (General
Residence and Office Zone) and subject to the H (Historic District Zone). The project area is
focused on the segment of North Street between South State Street and South Governors Avenue and
the area between West Loockerman Street and Bank Lane. The owners of record include Rudolph
von Croy c/o Colonial Investment & Management, Delaware State Housing Authority, Collegian
Plaza Hospitality Group II LLC, and the City of Dover; the equitable owner (for certain parcels) is
the Downtown Dover Partnership. The property addresses include 114, 116, 120, 126 and 128 West
Loockerman Street; 100, 104, 106, and 119 West North Street; 309 South Governors Avenue; and 16
and 22-26 The Green. Tax Parcels: ED-05-077.09-04-32.00-000, ED-05-077.09-04-06.00-000,
ED-05-077.09-04-31.00-000, ED-05-077.09-04-30.00-000, ED-05-077.09-04-08.00-000,
ED-05-077.09-04-09.00-000, ED-05-077.09-04-43.00-000, ED-05-077.09-04-42.00-000,
ED-05-077.09-04-51.01-000, ED-05-077.09-04-53.00-000, ED-05-077.09-04-53.01-000,
ED-05-077.09-04-07.00-000, ED-05-077.09-04-50.00-000 and ED-05-077.09-04-54.00-000.
Representatives: Mrs. Arden Bardol, Becker Morgan Group Inc., Mrs. Kristen Conway, Century
Engineering; and Mr. Jonathan Street, Becker Morgan Group, Inc.
Mrs. Melson-Williams stated that this is an application that was filed with the Historic District
Commission and regarding this situation you are on recommendation to the Planning Commission
for this application. Per your By-Laws, Mr. McDaniel has a conflict of interest because he is a
property owner within 200 feet of the subject project and will rescues himself from this application.
6
Página 8
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
He is also on the Board of the Downtown Dover Partnership who is one of the property owners. Mr.
Jackson is also a property owner within 200 feet who is not present at today’s meeting.
Mrs. Melson-Williams further stated that this was formally called the North Street Area
Improvement Project. In the Staff report, it lists the fourteen (14) parcels that are involved in the
project in total. This deals with an area that flanks North Street both to the north towards
Loockerman Street and then on the south side of North Street as it progresses towards Bank Lane.
Mrs. Melson-Williams further stated that there are multiple property owners involved and there is
also a mix of zoning for the properties as well. The Historic District Commission will make a
recommendation with regards to the project to the Planning Commission. The Planning
Commission is scheduled to hear this application on Monday of next week at their December
meeting.
Mrs. Melson-Williams further stated that the project consists of three (3) project areas in phases and
you may want to focus your discussions on those three (3) phases or areas to avoid confusion when
we get to that point. The three (3) areas involve what we term the Loockerman Way parking lot and
plaza. This is a redevelopment area; it is the vacant area of the block that is to the north of North
West Street between it and Loockerman Street. It is a proposed development with a parking lot area
and then a plaza area. The second project area is North Street itself. For North Street it is a
streetscape project for the work within the right-of-way dealing with the street itself, sidewalk, and
elements such as street lighting and utilities. The third piece of the project is what has been termed
the North Street Parking Lot Consolidation and that is the area to the south of North Street that is
held with multiple property owners and consists of a series of parking lots which are not
interconnected at the present time. They hope to consolidate those into a much better functioning
area with fewer entrances to the parking lot area.
Mrs. Melson-Williams further stated that provided in the Staff Report is some background.
Previous applications in the area are listed and most of them are ones that deal with the block that
fronts on Loockerman Street and how it became the vacant tract that it is today. Staff also provided
some background history on the area from a series of historic maps. It has had a life of both
commercial and residential in this area. The project areas themselves fall into two National
Register Historic Districts. Part of it is in the Victorian Dover Historic District and the remaining
area is within the Dover Green Historic District of the National Register.
Mrs. Melson-Williams further stated focusing on your Design Standards and Guidelines you would
be looking to judge this project against the discussions which occur in Chapter 3 which deal with the
Design Guidelines for landscaping and site amenities, paving and bordering, and parking lots.
Specifically, your consideration deals with how you treat areas surrounding buildings and dealing
with choices of materials. Specifically with parking lots, the Design Standards and Guidelines talk
about screening it from the street and a landscaping percentage occurring in the area to help mitigate
the paved area surface.
Mrs. Melson-Williams further stated as part of the Staff report there is a series of comments and
recommendations and we can discuss any concerns regarding those towards the end.
7
Página 9
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
Mrs. Bardol stated that she would provide some history and background beyond what information
has already been provided. As part of the MPO (Metropolitan Planning Organization) Study that
was done for the Downtown area, this specific project, the North Street Corridor, the parking lot, and
the vacant lot were all looked at and there were concepts for them. The thrust of the project in terms
of North Street was to try to extend all of the improvements that have been done on State Street
further up North Street to make North Street start to feel like a gateway to the Downtown as opposed
to a back alley.
Mrs. Bardol further stated that currently, the City as part of one of their projects has done some
improvements on the south side of North Street where they have replaced light poles. There is a
sidewalk on that side of the street. On the north side backing up to the project we just showed you,
there is no sidewalk in that area so the notion was to improve the pedestrian experience along North
Street. The next project that was discussed as part of the MPO Study was that if Downtown could
start to take lots of series of small parking lots and consolidate them into one larger lot that
reconfiguration may yield more parking without actually increasing land and impervious surface
area. In this particular case, that was the result by consolidating and co-mingling circulation
patterns and parking spaces. Within the land area that was available we were able to increase the
parking in this area as well as eliminate a series of driveways that occur along North Street and now
only have two (2) driveways.
Mrs. Bardol further stated that there is a proposal to provide some crosswalks. The third project is
the vacant lot and on that lot it creates a pedestrian plaza park as well as to augment some parking.
On behalf of the Downtown Dover Partnership when they were looking at this particular project, the
thought process was that in the future it would be nice to design this plaza so that if the Partnership
had an interest in developing buildings on this land in any fashion, that there were areas available to
do so in a useable fashion. There are useable footprints available which are why you see a picture of
the plaza running straight through on the Loockerman Street side; however, it shifts over to the
corner for a number of reasons. One of which was to get a clear connection and landing point at the
large parking lot and to also provide some sort of automatic payment system if the City wants to
pursue something of that nature so that you would pay out at the landing point which would be clear
for the visitors on where you pay and that there is also a clear connection on how you cross North
Street. State Street has pavers on it and Loockerman Street has pavers on the sidewalks and
Governors Avenue that is a main thoroughfare with a lot of activity going on. North Street is
culminating with a terminus at the Townsend Building and then heads out in the other direction
towards Eden Hill.
Mr. Street stated that he would speak regarding the parking lot itself. The plan for this consolidated
parking lot is with seven (7) different parking lots in this area currently with two (2) different
owners. Their thought is to take the existing parking area, the existing paving, to not necessarily
overstep our bounds, more of where the paving lines are up next to what is the Delaware State
Housing Authority and some residences and make it publicly accessible; however, sticking in those
same lines. Some of the pavement lines will be cleaned up. This looks like a lot of paving and
when you look at it in this format, it really is. Shown on the map in shaded areas are the existing
areas that are not paved which are about and extra 1,300 square feet. The total lot size is 70,000
square feet +/-. It is a rather large existing area of impervious surface and we are only 1,300 square
feet of additional paving which is cleaning up those lines and making them straight. We will also be
providing a connection with Bank Lane. There are five (5) entrance and exiting points currently on
8
Página 10
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
North Street. They are reducing that to two (2): one main entrance and exit and then one entrance
and exit at Bank Lane. We are creating a right-out exit onto North Street towards the Schwartz
Center. We felt this was best for traffic flow. They did not want to create a left hand turn out onto
State Street and have a waiting time.
Mr. Fisher questioned if central pay would be located at each entrance? Responding to Mr. Fisher,
Mr. Street stated that currently, that is being worked out. We are working out the agreement
between the Delaware State Housing Authority and Von Croy which owns five (5) of the parcels
with the Delaware State Housing Authority owning two (2). This project cannot move forward
unless that agreement is agreed upon by both parties.
Mr. Neaton stated that they are not sure how they are going to handle the payment on those parking
spaces currently. Currently, the spaces that the Partnership administers are all permit spaces.
Whether it be permit and daily parking are permit only, they have not made that determination.
Mr. Street stated that the Water Street lot previously had two (2) central kiosks where all the spaces
were numbered and then you paid according the space which could be one option for this parking lot
rather than having a gate at each entrance. Responding to Mr. Street, Mr. Neaton stated that it
would be preferable if we had a central kiosk.
Mr. Street further stated that their intention regarding sidewalks within each of the projects would
match what the Downtown currently uses for both State Street and Loockerman Street. There is a
small network of sidewalks in the parking lot. At Loockerman Way we have thirty-five (35) spaces
that would fall under the same permitting process. There will essentially be a pathway connecting
both projects and Loockerman Street. They are also honoring the agreement that currently the
Golden Fleece has with a five (5) foot access way to either Loockerman Street or North Street.
Mr. Scrafford questioned with regards to property acquisitions what are you going to own?
Responding to Mr. Scrafford, Mr. Neaton stated that they currently own five (5) of the seven (7)
parcels. There is a sliver of land within these parcels that the City currently owns. The Downtown
Dover Partnership has written a letter to the City Manager asking that this be declared excess and
that it be forward to City Council with consideration that this sliver of land be deeded to the
Downtown Dover Partnership.
Mr. Scrafford further questioned what they owned on the south side of North Street? Responding to
Mr. Scrafford, Mr. Neaton stated that they will not own any of those parcels. We will have
easement agreements. The draft easement agreement was received in his office today for review and
will be sent back to our attorney with suggestions for any changes.
Mrs. Conway stated that along North Street, the utilities will be placed underground by the City of
Dover. Everything will be located within the existing right-of-way throughout this area.
Mr. Scrafford questioned if everyone was comfortable with the North Street right-of-way? There
has always been a concern regarding the size of the right-of-way for North Street. Responding to
Mr. Scrafford, Mr. Street stated that there was only one thing that came up when they were going
9
Página 11
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
through the deed research and that was by the Schwartz Center. It was researched and we believe
that everyone was comfortable.
Mrs. Conway stated that the existing roadway width will stay the same along with curbing remaining
the same.
Mr. Scrafford questioned if the street lighting shown will be the plan? Responding to Mr.
Scrafford, Mr. Street stated that yes it will be. There are currently eight (8) poles out there
Mrs. Conway stated on North Street regarding the crosswalks, they show them as the brick paver
crosswalks and they are tossing around how they will be maintaining them. There is also the option
of stamping concrete.
Mr. Salkin stated that you mentioned 1,300 square feet of additional paving which would all be
asphalt. How does this compare to the planters and the green space that is there, is this greener?
Responding to Mr. Fisher, Mr. Street stated that no, it is 1,300 square feet less green. There are still
planters in and among that.
Mr. Fisher further questioned if they would be required to provide any drainage for those planters?
Responding to Mr. Fisher, Mr. Street stated that currently, what they are thinking is that currently,
the parking lot is a ridge where everything either goes to North Street or it comes back and drains.
There are existing systems within our parking lot and within the rear parking lot. Everything
currently either drains to Bank Lane or off of their own properties. We are planning on holding that
same drainage pattern to not overload any systems. When you are talking about 1,300 square feet
of 70,000 square feet area, we do not feel like it would be a large impact to anyone of those areas.
Mr. Salkin stated that for the parking lot in your Partnership area you do not show any handicap
parking does that mean there will actually be fewer spaces? Responding to Mr. Salkin, Mr. Street
stated no. The space count for the application is with handicap spaces. The handicap spaces were
not shown on the graphics. We have two (2) handicap spaces located on one side of the parking and
six (6) or eight (8) located on the other side. The Delaware State Housing Authority has one (1)
handicap parking space and he has talked to them on whether or not they would need that closer to
the back of their building and if it was for one of their employees. They did not seem to be
concerned about it.
Mr. Salkin further stated that you made reference to the Golden Fleece Tavern. Previously, in an
earlier meeting here we had a discussion regarding a fence along the western side of this property
(the fence at the back door to the tavern.) There was considerable discussion regarding it and the
Commission members agreed to recommend an exception to whatever the standard was because it
was temporary. Will everything get cleaned up when this property is cleaned up? He is wondering
what both sides of this property are going to look like and is any of that going to be dealt with or is
this going to be an ugly fence? Responding to Mr. Fisher, Mrs. Bardol stated that the intent with the
design was that this fence would come down and that there would be some sort of lower fence more
for keeping the people that are in the Golden Fleece drinking alcohol and eating in there visually
creating a barrier; however, to open up this space. The longer big picture is that if other activities do
occur there is a lot more synergy happening in activity rather than this wall.
10
Página 12
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
Mr. Salkin further questioned Staff if this was something that would have to come back to this
Commission? Responding to Mr. Salkin, Mrs. Melson-Williams stated that the Golden Fleece
came through as a permit referral because they were putting a fence in place that was taller than the
recommended standard in the Historic District which is four (4) feet in height and this fence is more
like five (5) feet six (6) inches. If they lower it so that their patrons can view the plaza they would
have to ensure that this is going to work with the Design Standards and Guidelines. It is a painted
wood fence currently.
Mrs. Bardol stated that the other thing that was not covered too much in detail is two-fold. We
talked a little about the crosswalks and she feels that it would be good to get some general feedback
regarding those crosswalks. The crosswalks, in an ideal world would be nice, we thought, to have the
crosswalks to have pavers similar to what is currently located on State Street.
Mr. Street stated that we would try to match the paver colors to what is located on State Street;
however, those pavers have been in place for some time now and these pavers will look newer.
Mrs. Bardol stated from an aesthetic point of view this is where we started out. When we started to
think about maintenance ability and how it would be constructed. What happens is that the pavers
located on State Street wrap up around the corner and the proposal that we have for North Street is
for asphalt. When you introduce asphalt with some sort of barrier buffer between the asphalt to get
to the pavers, the movement could be an issue especially during snow removal.
Mr. Fisher questioned if they could do a stamp rather than actual pavers to avoid that issue?
Responding to Mr. Fisher, Mrs. Bardol stated that this was their next proposal because to actually
delineate these crosswalks by doing some sort of stamped pattern at those crosswalks so that it is
clear that it is different.
Mr. Salkin stated that you have raised the question regarding color of the pavers and he does not
have strong enough feelings to make a recommendation; however, when he looks at the drawings
and thinks about what Downtown looks like, he is not sure why this should be red brick at all. You
show a new design for North Street that really does not speak to red brick, Federal, or Colonial; it is
fairly modern or a turn of the century. There is nothing about this area that really speaks to brick at
least from his experience. He is not recommending something in its place; however, it seems to him
if you are trying to create a new standard with a modern look in a Historic District, some of these
other colors might be more appropriate. He personally does not have any objection to moving away
from red brick. Have you given consideration to any other color or are we just going to have more
and more red brick sidewalks everywhere in the community even if there is no history of it?
Responding to Mr. Salkin, Mrs. Bardol stated that in terms of where the red brick came from, one of
the properties does have a lot of red brick on the sidewalk into the driveway. We were not tying into
that specifically; however, it was more a notion of trying to expand and be consistent with what the
Historic District is so the red brick does speak to that. From a cost perspective on Loockerman
Street, we have a combination of concrete and pavers so it would be a lot less expensive to do
concrete and have some accent areas of brick that would be acceptable. In this plaza area, we have
looked at both pavers and stamped concrete and both of them have a variety of complimentary paver
colors. The thought is in the plaza areas we would have a combination of concrete that is scored and
11
Página 13
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
then some different paver colors. Paver samples were shown. We are not suggesting all three of
these; however, that it be either the dark and something a little lighter or the dark and the brown.
We are looking to see if this Commission had a preference for this.
Mr. Fisher stated that they are constantly told that they are not to deal with color.
Mr. Salkin stated that he does not feel that they need to deal with color. He feels that the design
professionals could deal with that. There have been a number of times that they go with the red
brick because we somehow think red brick is Dover’s appropriate historic color and sometimes he
feels that we have done that inappropriately. He does not have any objection to what you propose.
If it is red he is fine with it; he is just trying to find out if there had been discussion on alternatives.
Mrs. Bardol stated that if this Commission would be okay with a combination of concrete and some
brick accents this would certainly be something they could entertain or brick with concrete accents.
Mr. Scrafford stated that he does not have a problem with the architectural approach to the street and
not a confined approach to the street. By this Commission having a rule, you are confined with
what you can do. By this Commission being open, he would leave it to you to address this from an
architectural standpoint not from a fixed platform.
Mr. Salkin stated that he is open to alternatives; however, he would want to see the final alternative.
When it comes to colors we do not want to police that; however, when it comes to design and a new
standard for a whole section of town, he feels that this Commission should see that.
Mrs. Bardol questioned if they were to keep what they have with the red brick would you be good
with that? Responding to Mrs. Bardol, Mr. Scrafford stated is there anything that you think adds
more character to what it is we are trying to do without adding more expense.
Mr. Street stated that if you want to go with something other than complete red brick, is this
something that would be a cursory review or would it be something that would have to go through
another application? Responding to Mr. Street, Mrs. Melson-Williams stated that it would not be
another application. It could potentially come back as more of an informational item since they
have tossed that idea out there to you. If it was something very drastic, Staff would most certainly
be bringing it forward.
Mr. Scrafford opened a public hearing.
Mr. Joe McDaniel – Property Owner on The Green – Stated that as a citizen and member of this
Commission, Mr. Jackson and I have talked about stamped concrete and how ugly it is on The
Green. There are certain areas where there is stamped fake brick and to hear the talk of let’s get
some concrete and score it makes him nauseous. He is violently against it. They are leaning
towards what is currently on Loockerman Street. Avoid the stone pavers that people trip over and
you can’t really walk on around the trees. The stamped concrete is something that he would caution
you against approving as it does not seem to be appropriate. He would guess that you would have to
have stamped concrete in the streets even though you do not have it now with the way that you are
12
Página 14
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
talking. He does not want to run the cost up on this project; however, he does realize that this is not a
Colonial area; however, he does feel that it should tie in. The fact that you came back to red brick
sidewalks made him feel better about the project as he feels that this is the color that it should be.
Conny Malmberg – Nearby Property Own on the Green – Questioned if the curbing was all
getting re-done along North Street or is the existing curbing being used? It would have to at least be
done on one side of the street because you are doing curb cuts. Responding to Mr. Malmberg, Mrs.
Conway stated that most of it would be improved. On the south side with the five entrances they
would replace the entire thing.
Mr. Malmberg further question if the street would be dug up for utility purposes and be closed for a
while? Responding to Mr. Malmberg, Mr. Street stated that for the replacement of utilities we will
meet on Monday to talk with the City about placement of those utilities. There are already some
existing buried electric lines, the rest of the lines are for communication.
Mr. Malmberg further questioned what the timeline would be as you stated that this would be done in
three (3) phases. The parking lot depends on third party agreements. For the street within the
right-of-way, what is the timeline regarding that? Responding to Mr. Malmberg, Mr. Street stated
that everything is scheduled to move forward together. The three (3) phases speak just to the three
(3) separate projects. If the street gets held up for something, it does not have to be done with
everything else.
Mr. Neaton stated that it is referred to in phrases because that is the way that the funding came to us
in three different phases with x amount of dollars for each phase.
Mr. Malmberg further questioned that on the Partnerships Plaza there are no physical structures
planned at this time? Responding to Mr. Malmberg, Mr. Neaton stated not at this time. There is
potential future development for that site but nothing currently.
Mr. Scrafford closed the public hearing after seeing no one else wishing to speak.
Mr. Street stated that his only question to Staff is the potential for historic archaeology resources and
would you need us to contact them. The south side is currently a parking lot and we are not
changing that. The north side was the Dover Hardware and the Dover Newsstand, Capitol Office,
and a plaza area. Responding to Mr. Street, Mrs. Melson-Williams stated that this is a typical
advisory comment that we place any time there is a vacant tract of land. You may not know what
was there previously because construction activities could discover these things. If you are using
Federal money in your project in any way, shape, or form you are into Section 106 which could have
archaeology implications associated with it which she does not believe that you are in this situation.
Mr. Neaton stated for informational purposes, we conducted a Phase II Environmental Study for the
property as they were some indications afterwards from Phase I that they needed to move forward
with Phase II so that has been done.
13
Página 15
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
Mr. Salkin questioned if the applicant has any objections or concerns with the Staff comments and
recommendations other than the question that was just asked? Responding to Mr. Salkin, Mr. Street
stated that the only other question that was discussed with Mrs. Melson-Williams at the DAC
meeting was that we have six (6) light fixtures that are being removed from part of the parking area.
We have asked that we be able to reuse them towards the back towards the Delaware State Housing
Authority building. We have had discussions with the Delaware State Housing Authority regarding
the overall agreement and they have expresses concerns regarding lighting, security, among other
things. Instead, in speaking to the cost of the project in which we only have a certain amount of
money for the project, we have these light fixtures that are currently very efficient lighting for the
parking lot and we could use those towards the back portion of the parking lot. The remainder of
the parking lot, North Street, and the plaza area would all be this acorn style fixture. He is unsure
whether the Commission would have any objections towards this.
Mr. Salkin questioned what the style of the lamp would be? Responding to Mr. Salkin, Mr. Street
stated that it would be a square metal fixture that is a grey aluminum pole that would be inconsistent
with the rest of the poles.
Mr. Scrafford and Mr. Salkin both expressed that they would rather not see a mix of colored poles in
this lot. You would be detracting from the overall scheme of the project. If you were using
something that was similar he would say yes. With regards to the stamped concrete that Mr.
McDaniel referred to, he would have a hard time approving stamped concrete.
Mr. Fisher stated that the comment he made regarding putting pavers in the street and them moving,
if you use stamped concrete you would not get movement. Responding to Mr. Fisher, Mr. Street
stated that the street would be stamped as regular asphalt. Mrs. Bardol was speaking of scored
concrete along part of the Plaza area not the stamped concrete.
Mr. Fisher and Mr. Scrafford both expressed the fact that they would not support stamped concrete.
Mrs. Bardol stated that she needed to comment on part of the idea of the reuse of the lighting fixtures
in the parking lot that came from the whole funding allocations. This project has very tight funding
and what she is concerned about is that those poles are expensive. She would hate for the parking
lot not to happen because we could not afford to put new light fixtures in that entire lot.
Mr. Salkin questioned if a ballpark figure could be provided for the additional light fixtures?
Responding to Mr. Salkin, Mr. Street stated that they can run anywhere from $10,000 to $15,000 for
the complete fixture that includes the pole and the light.
Mr. Neaton stated that they could provide the costs associated with a new light fixture. We also
need to find out how much light differential there would be between the new poles and the existing
poles. There is concern from the Delaware State Housing Authority regarding security on that side
and is where we were proposing to move the permanent fixtures to the back of the lot. Their
concern was over the amount of light these smaller acorn fixtures would throw out. We will get all
those figures together for this Commission.
14
Página 16
CITY OF DOVER HISTORIC DISTRICT COMMISSION NOVEMBER 15, 2011
Mr. Salkin stated that there may be some alternative type of lighting scheme that is not about lighting
the parking lot; however lighting with a different type of fixture.
Mr. Salkin moved to approve forwarding to the Planning Commission a recommendation of
approval of HI-11-05 North Street Area Improvement Project endorsing the comments and
recommendations made by Staff, seconded by Mr. Fisher and the motion was unanimously carried
3-0 with Mr. Jackson absent and Mr. McDaniel recusing himself as he is a property owner within
200 feet of the subject property.
ON-GOING PROJECTS
Discussion of the Project to Evaluate and Update the “Design Standards and Guidelines for
the City of Dover Historic District Zone”
Mrs. Melson-Williams stated that Staff did not have anything regarding this subject at this time as
she has not been working on it due to other responsibilities.
Mr. Fisher moved to adjourn the meeting, seconded by Mr. Salkin and the motion was
unanimously carried 4-0 with Mr. Jackson absent.
Meeting adjourned at 4:31 PM
Sincerely,
Diane Metsch
Secretary
15
Página 17
City of Dover Historic District Commission
Summary of Applications 2009-2010
Updated as of January 2012
FILE# PLAN NAME LOCATION TYPE ACTION STATUS
HI-09-01 Dover 'Anchor' Public 35 Loockerman Plaza: 2 story 46,000 S.F. library 6/17/2009 HDC Recommendation of Final Plan Approval for Bid Pack A
S-10-06 Library Adjacent to 15 East building with site Approval with Conditions for ArchRevCert; (Access Road to Innovation Way)
Loockerman Plaza improvements 3/15/2010 PC Approval of Site Plan and 8/27/2010; Bid Pack A under
ArchRevCert with Conditions construction December 2010 and
completed May 2011 (Building Permit
#11-444). Final Site Plan approval
3/18/2011. Ground Breaking
Ceremony held 4/5/2011. Building
Permit #10-1904 issued 4/26/2011.
Construction underway; as of
10/1/2011 most structural steel is in
place. Construction of exterior finishes
(walls & roof) underway including
brick masonry work as of Dec 2011.
HI-09-02 Fence Permit #09-1634 at 132 West Loockerman Fence Construction along 10/6/09 Permit #09-1634 referred to HDC Fence Project Complete.
new Golden Fleece Tavern Street east property line at rear of
by City Planner for Architectural Review
building Certification; 10/15/2009 HDC Approval of
ArchRevCert; Other building renovation
activities covered under Permits #09-1420
for Exterior Finishes of East Elevation and
#09-1388 Rear Patio. Permit #09-1634
issued 1/25/2010.
HI-09-03 Mitten & Winters Offices 117-119 West Loockerman Front façade renovations: 11/19/2009 HDC Approval with Conditions Permit #09-2056 issued for Front
Street removal of buff brick and of ArchRevCert; Window Replacement Façade Renovations. Project
replacement of brick; pent ARC approval under Permit #09-1800 Complete.
roof; soffit; doors; window issued 10/27/09; Other building renovation
replacement activities covered under Permits #09-1592
issued 10/8/09 for Interior Renovation -CO
issued and #09-1801 issued 10/27/09 for
Rear Elevation.
HI-09-04 Bayard Hotel 200-216 West Loockerman Consideration of Demolition 1/21/2010 HDC Determination of Redevelopment application HI-10-08
Street by Neglect Demolition by Neglect and outlined required filed. Building Documentation
steps; 6/10/2010 HDC discussion on status, package of plans, elevations, photos
request return at July meeting; 7/15/2010 received March 2011.
Update on status
HI-10-01 Building at 301 South 301 South Governors Consideration of Demolition 6/10/2010 HDC Determination of Building Inspections for asbestos
Governors Avenue Avenue (southeast corner by Neglect Demolition by Neglect and outlined action completed -- requires asbestos
of North Street and S. to be taken within 90 days; 9/16/2010 removal. Building Demolished by
Governors Ave.) Status Update indicates no action taken, order of City Council as a Dangerous
HDC Recommends Building Inspector Building. Demo Permit #11-143
begin Dangerous Building proceedings with issued 2/07/2011. Demolition
recommendation of repair. City Council complete.
declared it a Dangerous Building on
10/25/2010.
Página 18
City of Dover Historic District Commission
Summary of Applications 2009-2010
Updated as of January 2012
HI-10-02 Law Enforcement Officers South side of Legislative
Memorial of brick plaza, Information Item presented to HDC on Project Complete.
Memorial Mall and north of William
inscribed wall and bronze 2/18/2010; Building Permit #10-245 issued.
Penn Street statue
HI-10-03 Woodburn: Solar Panels 151 Kings Highway Installation of Solar Panels 3/18/2010 HDC Approval with Conditions. Building Permit #11-960 approved
on south facing gable roof of 3/17/2011 HDC granted extension of 8/8/2011. ArchRevCert completed by
main house approval and heard presentation on revised Staff.
project concept and change in location to
roof of addition.
HI-10-04 Wesley United Methodist 209 South State Street Addition of elevator tower 4/15/2010 Inadequate Public Notice; Final Plan Approval 1/14/2011.
Church: Elevator and and canopy on south side of 5/20/2010 HDC Review and Building Permit #11-113 issued
Canopy Addition sanctuary to improve Recommendation of Approval of 4/29/2011. Construction underway.
accessibility; construct ArchRevCert with Conditions
vehicular exit only onto S.
State Street
HI-10-05 Duncan Plaza 600 Forest Street 4 story 31,710 S.F. office 6/10/2010 HDC Review, action to approve Project must submit Check Prints of
S-10-17 (Intersection of building with coffeeshop setbacks, direct applicant to address Staff Site Plan for review and Final Plan
Loockerman, Kirkwood, Recommendations and reappear for review Approval. No Action to date.
and Slaughter Streets) of revisions; 7/15/2010 Revised
Architecture presented to HDC, HDC
Recommendation of Approval of
ArchRevCert with Conditions; 9/20/2010
Planning Commission approval of Site Plan
and ArchRevCert with conditions.
9/19/2011 PC granted one year extension.
HI-10-06 Delaware Public Archives: 121 Duke of York Street Placement of six 8/19/2010 HDC Approval of ArchRevCert First set of Banners installed January
Banner Program changeable banners using with conditions; Sign Permit #10-1912 2011 (total of 5 banners)
frame attachment system issued 1/7/2011.
HI-10-07 Building Permit #10-1263 408 South State Street Replacement of Metal Roof 8/19/2010 HDC Approval of ArchRevCert Building Permit #10-1263 issued on
Referral with Conditions on the type of roof: wood 11/15/2010. Wood shingle roof
shingle recommended for front installed; Project complete.
HI-10-08 Bayard Plaza 200-216 West Loockerman 5 story 54,998 S.F. mixed 10/21/2010 and 11/4/2010 HDC Review; Demo Permit #11-579 issued
S-10-30 Street and 208 South use building with 5012 S.F. 11/4/2010 HDC Recommendation of 5/12/2011 and demolition now
Governors Avenue retail space and 48 Approval with Conditions for complete. Final Plan approval granted
residential apartments; ArchRevCert;11/15/2010 Planning 8/3/2011. Building Permit #11-656
requires demolition of Commission approval of ArchRevCert with issued. Construction underway:
existing buildings on Conditions; also BOA Application V-10-15 foundations, started structural steel in
property for parking setback and Active Rec Area December 2011.
reduction
HI-10-09 Biggs Museum: Façade 406 Federal Street Renovations to east 11/18/2010 HDC Approval of ArchRevCert Building Permit #11-636 reviewed for
Renovations elevation: moving glass with Conditions Phase 1-Interior Renovations only.
curtain wall system and Construction for Phase 1 mostly
renovations to connector complete; Temp CO issued 11/1/11.
element
Página 19
City of Dover Historic District Commission
Summary of Applications 2009-2010
Updated as of January 2012
HI-10-10 Building Permit #10-1672 New Jerusalem Baptist Siding Replacement on 10/21/2010 HDC Approval of ArchRevCert Project complete. Siding, new
Referral Church at 25 Slaughter second floor levels of north
with Conditions requiring vinyl siding to be gutters/downspouts installed, and
Street and south elevations horizontal and other trimwork and gutter some painting completed.
recommendations; Building Permit #10-
1672 issued 11/2/2010.
HI-10-11 Parking Lot on West Water 101 West Water Street and Renovations to existing 12/16/2010 HDC Recommendation of Final Plan approval 5/24/2011.
S-11-03 Street: Renovation and 439 South Governors parking lot and expansion of Approval of ArchRevCert with conditions; Building Permits #11-768 issued
Addition Avenue lot to total of 152 parking Planning Commission approval of 6/21/2011 and #11-812 issued
spaces ArchRevCert with conditions. 6/27/2011. Construction complete;
awaiting final inspection approvals
from all agencies.
Página 20
Summary of Permit Applications with Architectural Review Certification
Updated as of 12-31-2011
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
1/7/2011 10-912 121 Duke of York St, Sign Permit - Banner program Approval per HI-10-06 Delaware Set of Banners are in place
Delaware Public Archives Public Archives Changeable Banner
program
2/7/2011 11-055 410-414 Federal Street, Building Permit - Installation of Staff Approval Solar Panels installed
New Kent County Solar Panels, roof mounted
Courthouse
2/7/2011 11-143 301 South Governors Demo Permit - demolition of Approval per HI-10-01 Demolition by Building Demolished
Avenue building Neglect determination by HDC and
declared Dangerous Building by City
Council
3/16/2011 11-296 27 West Loockerman Street Sign Permit - Hunter House Staff Approval Signs Installed
restaurant
3/15/2011 11-300 313 West Loockerman St Temporary Sign Permit Staff Approval
3/21/2011 11-324 140 West Loockerman St Roof Permit Not reviewed by Planning Staff. Later review of permit showed
Issued by Admin Staff. no specific detailed info on roof
project. Building does have a
flat roof that is not visible from
the public way.
4/26/2011 10-01904 35 Loockerman Plaza Building Permit - Library Approval per HI-09-01 Dover Public Construction underway.
Library
4/29/2011 11-113 209 South State Street, Building Permit - Elevator & Approval per HI-10-04 Wesley Construction underway.
Wesley UM Church Canopy Addition Church: Elevator & Canopy Addition
4/12/2011 11-413 424 South State Street Sign Permit - Computers Fixed Staff Approval Sign Installed
Today
4/11/2011 11-437 140 West Loockerman St Admin Permit - new retail Staff Approval New tenant occupying building.
tenant
4/12/2011 11-440 48 The Green Sign Permit Staff Approval Sign Installed
4/14/2011 11-460 209 South State Street, Temporary Sign Permit Staff Approval Temporary Sign installed and
Wesley UM Church now removed.
Página 21
Summary of Permit Applications with Architectural Review Certification
Updated as of 12-31-2011
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
4/21/2011 11-491 146 South State Street Sign Permit - The News Journal Staff Approval Sign installed.
5/24/2011 11-306 209 West Loockerman St Building Permit - Repairs to Staff Approval Permit Issued
Block Foundation Wall
5/11/2011 11-444 35 Loockerman Plaza Building Permit - Access Drive Approval per HI-09-01 Dover Public Access Drive is complete.
for Library Library
5/10/2011 11-558 410 Federal Street, Kent Sign Permit Staff Approval Sign Installed
County Courthouse
5/16/2011 11-563 22 The Green Building Permit - Replace Staff Approval Permit Issued
porch column due to accident
damage
5/12/2011 11-567 501 South State Street, Temporary Sign Permit Staff Approval Temporary Sign installed and
Christ Church (VBS/Welcome Banners) removed.
5/12/2011 11-579 200 West Loockerman St, Demolition Permit Approval per HI-09-04 and HI-10-08 Demolition complete.
Bayard Hotel property and due to safety concerns
5/13/2011 11-612 136 West Loockerman St Sign Permit - Beehive Beauty Staff Approval Signs Installed
Shop
5/24/2011 11-644 54 South State Street, Window Permit - replace two Staff Approval with conditions on the Permit issued
Presbyterian Church sets of windows format of new windows
5/25/2011 11-659 30 Loockerman Plaza, Temporary Sign Permit (VBS Staff Approval Temporary Sign installed and
Wesley Education Building Banner) removed.
6/21/2011 11-636 406 Federal Street, Biggs Building Permit - Interior Staff Approval, phase of project Phase 1 Project Complete.
Museum Renovations associated with HI-10-09 Temp CO issued 11/1/11.
6/6/2011 11-723 54 South State Street, Temporary Sign Permit (VBS Staff Approval Temporary Sign installed and
Presbyterian Church Banner) removed.
6/21/2011 11-768 101 West Water Street Building Permit - Parking Lot Approval per HI-10-11 Construction complete; Final
Approval for CO pending.
6/27/2011 11-812 101 West Water Street Building Permit - Fence Approval per HI-10-11 Fence installation complete.
7/6/2011 11-813 516 West Loockerman St - Building Permit - Interior Staff Approval Construction complete.
Old Train Station Renovations for HVAC
7/7/2011 11-874 406 Federal Street, Biggs Temporary Sign Permit (Film Staff Approval Temporary Signs installed and
Museum Series) removed.
Página 22
Summary of Permit Applications with Architectural Review Certification
Updated as of 12-31-2011
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
7/27/2011 11-923 139 South State Street - Sign Permit Staff Approval Signage installed in late August.
M&T Bank (Wilmington
Trust)
7/27/2011 11-924 29 Kings Highway - M&T Sign Permit Staff Approval Signage installed in late August.
Bank (Wilimington Trust)
7/26/2011 11-948 43 East Division Street Demolition Permit Staff Approval per HI-11-02 House demolished late July-
Demolition by Neglect August 2011
8/10/2011 11-656 200 West Loockerman St, Building Permit Staff Approval per HI-10-08 Bayard Demolition complete and
Bayard Hotel property Plaza construction underway.
8/19/2011 11-925 38 The Green, Old Kent Building Permit (Phase 3 Staff Approval per HI-06-03 Interior Renovations underway
County Courthouse Renovations) and exterior repairs/painting
proposed.
8/15/2011 11-960 151 Kings Highway SW, Building Permit - Solar Panels Staff Approval with reference to HI- Installation underway.
Woodburn 10-03
9/14/2011 11-414 48 The Green Sign Permit Staff Approval per HI-11-03. Signage installed.
9/1/2011 11-1029 144 Kings Highway SW, Building Permit - Interior Staff Approval Construction complete; CO
Governors Club Building Renovations issued.
9/22/2011 11-1203 420 South State Street Building Permit - Porch Staff Approval Construction complete
Addition on Side/Rear 11/29/2011
11-1216 3 Loockerman Plaza Temporary Sign Permit Staff Approval Temporary Sign installed and
9/21/2011 removed.
9/26/2011 11-1084 115 West Loockerman Building Permit - Façade Staff Approval Permit Issued
Street Repairs
9/29/2011 11-1197 316 South Governors Building Permit - Interior Staff Approval Construction complete: CO
Avenue, Old Brick Church Renovations, Brick Walkway issued 12/22/11.
Improvements for ADA
accessibility
9/29/2011 11-1261 505 South State Street, Temporary Sign Permit Staff Approval Temporary Sign installed and
Christ Church removed.
10/7/2011 11-1259 151 Kings Highway SW, Building Permit - Interior Staff Approval Construction completed ealry
Woodburn Renovations to Kitchen Janaury 2012.
Página 23
Summary of Permit Applications with Architectural Review Certification
Updated as of 12-31-2011
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
10/3/2011 11-1273 535 South State Street Window Permit Not reviewed by Planning Staff.
Issued by Admin Staff.
10/21/2011 11-1279 317-331 South State Street Sign Permit Staff Approval Sign Installed.
10/10/2011 11-1302 121 Duke of York St, Sign Permit Staff Approval Signage to be placed on
Delaware Public Archives Legislative Avenue side of
building.
10/21/2011 11-1310 209 South State Street, Temporary Sign Permit Staff Approval Temporary Sign installed and
Wesley UM Church removed.
10/25/2011 11-1386 131 West Loockerman Sign Permit Staff Approval Sign Installed.
Street, Wild Side
11/16/2011 11-1278 34 The Green, Lynn/Perza Sign Permit Staff Approval Signs Installed
Law Office
11/28/2011 11-1385 502 South State Street, Building Permit Staff Approval associated with S-06- Dumpster enclosure
State Street Commons 19
11/2/2011 11-1388 31 West Loockerman Street, Sign Permit Staff Approval Sign Installed.
Suds Bar
11/21/2011 11-1427 27 West Loockerman Street Building Permit - Interior Staff Approval Construction underway.
Renovations
11/18/2011 11-1508 150 East Water Street, Roof Permit Staff Approval Misc. Roof repairs.
Credit Union Building
11/28/2011 11-1521 144 Kings Highway SW, Sign Permit Staff Approval Sign Installed for Governors
Governors Club Building Club Café.
12/1/2011 11-1433 132 West Loockerman Roof Permit - Reclad Pent Roof Staff Approval Roof Project.
Street, Golden Fleece
Tavern
12/20/2011 11-1511 326 West Loockerman Demolition Permit Approval per HI-11-01 Building at Permit Issued
Street 326 West Loockermans Street
12/5/2011 11-1542 25 West Loockerman Street Soffit and Facia Permit Staff Approval Woodwork repairs and
painting. Permit issed.
Página 24
Summary of Permit Applications with Architectural Review Certification
Updated as of 12-31-2011
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
12/9/2011 11-1559 6 South State Street Building Permit - Porch Staff Approval Repair in-kind metal porch roof
Structure and Roof Repairs and three wood porch columns
with trimwork detailing. Permit
issued.
12/6/2011 11-1573 406 Federal Street, Biggs Temporary Sign Permit Staff Approval Temporary Signs installed and
Museum removed.
12/12/2011 11-1578 401 Federal Street, Building Permit - Interior Staff Approval Permit issued.
Townsend Buidling Renovations
12/16/2011 11-1581 151 Kings Highway SW, Building Permit - Interior Staff Approval Permit issued.
Woodburn Renovations to Garage
buidling
12/9/2011 11-1598 6 Elm Terrace Fence Permit Staff Approval Permit issued.
Página 26
City of Dover
ARCHITECTURAL REVIEW REPORT
Referral by City Planner to Historic District Commission
Meeting of January 19, 2012
Permit: Permit #12-0018 for Exterior Renovation
Location: Proposed new location of Frankfurt Bakery at 323 South
Governors Avenue, Dover Delaware
East side of South Governors Avenue between West North Street
and Bank Lane
Tax Parcel: ED-05-079.00-04-46.00-000
File Number: HI-12-01
Referral of Permit:
The following application Building Permit #12-0018 is referred by the City Planner to the
Historic District Commission for consultation regarding the issuance of the Architectural Review
Certificate. Applications for exterior renovations within the Historic District Zone (H) are
reviewed by the City Planner (or Staff as designated) for Architectural Review Certification as
part of the Building Permit application review process. Based on Staff’s review of this permit,
Staff has concerns regarding issuance of the Architectural Review Certificate and therefore is
referring the Permit for review under the provisions of Zoning Ordinance, Article 10 Section
3.22(A) and (B). See below.
Section 3.22 Architectural review certification by the city planner.
(A) An architectural review certificate for specific classes of building permits, including fences,
signs, siding, window and door replacement, roofing, the addition or replacement of
decorative features, minor demolition, residential additions, and other construction of a
minor nature, may be issued by the city planner, after a review and determination that the
proposed construction is in general accordance with the standards set forth in subsection
3.25.
(B) The city planner may refer any permit application for demolition or construction in the
historic district for consultation with commission.
Permit Proposal:
Building Permit #12-0018 was filed on January 5, 2012 for the proposed exterior renovation
project to the existing one story building at 323 South Governors Avenue, Dover. The permit
also includes interior renovations which are not subject to the Architectural Review Certification
process. In addition, the site improvements already completed at the site consist of paving a
parking lot area in front of the building and a drive aisle on the north side of the building for
loading activities.
The exterior renovation project focuses on new exterior wall finishes and door and window
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Página 27
HI-12-01 Permit #12-0018 at 323 South Governors Avenue
Staff Report to the Historic District Commission
Page 2 of 5
replacements. For the front (west) facade, the proposal is to cover the concrete block portion of
the wall with a grey brick veneer with a traditional lap vinyl siding in the gable area. Also on this
façade the existing double leaf wood door would be replaced with a new door with side light
combination with decorative glass. The existing twenty-paned paired windows would be replaced
with a single pane paired window that is smaller in size. The application also seeks to apply new
vinyl siding (traditional lap style siding) in a stone clay color to the south, east, and north
elevations of the building. See permit application form and attachments.
Staff Review of Permit for Architectural Review Certification:
The existing building appears to have been constructed mid-to-late twentieth century. The front
(western) portion of the building is concrete block and the rear (eastern) portion is clad in vertical
wood siding. The building is capped with a gable roof of asphalt shingles. The building was
previously used as the Ellis Furniture Works.
While located in the National Register listed Dover Green Historic District area, the building was
deemed a non-contributing resource to the district at the time of the National Register nomination
due to its post-1945 construction date. Historic maps from 1868 and 1887 show the lot
previously occupied by a two story dwelling that was extant into the first quarter of the twentieth
century.
In reviewing the proposed project for Architectural Review Certification, Staff referenced
various sections of Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing
Historic Buildings of the Design Standards and Guidelines for the City of Dover Historic
District Zone which presents the Recommended, Not Recommended, and Inappropriate
approaches to construction of various elements in the Historic District. Also the section on
Storefront Replacement in Chapter 5 pages 5-4 and 5-5 was helpful in considered this project.
Staff findings are summarized as follows:
Exterior Wall Finishes (New Brick Veneer and Vinyl Siding): The Recommended
practice for exterior finishes typically is to retain and repair the existing finishes. One
option is to repair then repaint the concrete block and also to repair and refinish/restain
the wood siding on the building. However, given this building is a modern intrusion in
the Historic District other options could be considered for the exterior wall finishes that
would fit the character of the Historic District.
o Brick Veneer: The use of brick veneer on a portion of the front façade could be
considered. The process of installation of the brick including the detailing around
the door and window openings (headers and sills) and how the brick is ended or
‘turns’ the building corner is key to appropriate implementation of this material.
o Vinyl Siding: The use of vinyl siding is deemed Inappropriate in this area of the
Historic District as per the Design Standards & Guidelines. However, a series of
steps related to the installation of vinyl siding is given to mitigate its effects if
approved for installation. The use of a horizontal siding product (wood, fiber-
2
Página 28
HI-12-01 Permit #12-0018 at 323 South Governors Avenue
Staff Report to the Historic District Commission
Page 3 of 5
cement board, or vinyl siding) could occur with consideration given to the siding
profile, exposure width, and trimwork detailing at openings and corners.
Entrance Door: The current double leaf wood entry door appears to have been crafted for
the opening in the spirit of the previous building tenant. With this new commercial tenant
a more durable door system is required. For commercial establishments, the Guidelines
recommend a panel door with glass inset in the upper part of the door or a storefront door
system primarily of glass. The door and sidelight presented in the permit submission is a
residential style door and sidelight with decorative glass.
Windows (Replacement of Front Façade Windows): The proposal is for replacement of
the existing windows with a new single lite paired window set in a reduced sized opening.
If full replacement of the existing windows is necessary due to window condition, the
Guidelines recommend that the replacement windows replicate the existing windows in
pane configuration, operation, and window opening size.
The building appears to lack a gutter and downspout system on the north and south
elevations to assist in moving water away from the building.
Parking Lot & Landscaping: With the entire area between the street frontage sidewalk and
the building paved with asphalt for site access and parking, there is no space designated
for landscape screening of the parking lot as Recommended in the Guidelines. The rear
yard area of the property should also be stabilized with grass planting. The placement of
an exterior cooler and freezer on the east end of the building will be visible from
adjoining properties and nearby Bank Lane. The Guidelines recommend screening of
mechanical equipment.
Historic District Commission Action
The Historic District Commission should consider the proposal for exterior renovations and take
action in regards to the Architectural Review Certification for the project.
Advisory Comments
1. The applicant shall be aware that a Permit is required to proceed with construction activities
on the property. The permit application must be updated if necessary comply with the
conditions established through the Architectural Review Certification process.
2. A series of Staff recommendations are provided for each project activity in order to allow for
contemporary design elements compatible with the visual character of the Historic District
and for project activities to comply with intentions of the Design Standards and Guidelines.
Exterior Wall Finishes:
a. Brick veneer on the front façade should include appropriate detailing of a header
over the door opening and a header and sill at the window opening.
b. Brick veneer should wrap around the building corner on both sides in order to
provide a clear transition to the secondary wall finish (the siding).
3
Página 29
HI-12-01 Permit #12-0018 at 323 South Governors Avenue
Staff Report to the Historic District Commission
Page 4 of 5
c. Any necessary repairs to the concrete block wall should be made prior to
installation of the brick veneer.
d. The siding product (vinyl or composition siding) should be installed in a
horizontal format. The clapboard style is recommended with a minimum exposure
of 4 inches.
e. A shingle style product could be utilized within the gable area rather than the
horizontal siding.
f. Add trimwork detailing at the transition points between materials such as
cornerboard posts at corners of the wall and trimwork around door and window
openings, etc.
g. Install a louver vent to maintain attic ventilation.
h. The gable area is the appropriate location for a wall mounted sign of the business
name.
Entrance Door replacement:
a. Recommend using a commercial style door with glass inset in the upper portion of
the door and a solid panel below or a storefront door system primarily of glass.
b. Glass inserts in the door and sidelight should be plain glass.
c. Consideration could be given to a reduction in the width of the door opening to
accommodate a single width door with no sidelight.
Window replacement:
a. Retain the large sized window opening as it proportioning fits the façade better
than the smaller opening proposed in the permit submission. Since it appears that
repair/replacement work is necessary below the window, some of the block work
could be replaced so that two full courses of concrete block exist below the
opening (thus slightly increasing the sill height from the ground/floor level.
b. The paired window format is appropriate for the large opening. Also paired
windows with transom windows above could be considered.
c. The window light configuration could replicate the divided light pattern of the
existing or an alternative pattern of dividing the glass area. If simulated divided
light windows are utilized then exterior gridwork should be utilized to give
dimension to the mullions/muntins.
d. The two vinyl clad paired single lite windows replaced on the north elevation may
remain as they have limited visibility from the public street. Trimwork needs to be
added around these windows to finish the appearance.
Site Landscaping:
a. Recommends the additional landscaping in any unpaved areas between the
building and the street such as shrub plantings.
b. All unpaved areas of the property must be stabilized and grass lawn area
established.
3. The following items should also be addressed with the project:
a. Recommend the addition of a gutter and downspout system for the north and
south elevations of the building. This will assist in moving water away from the
4
Página 30
HI-12-01 Permit #12-0018 at 323 South Governors Avenue
Staff Report to the Historic District Commission
Page 5 of 5
building. The recommended forms are the half-round or plain rectangular metal
gutter placed at the roof edge (along the trimwork) and plain (not corrugated)
rectangular or round metal downspouts.
b. Recommend the screening of the exterior cooler and freezer through landscape
plantings of evergreen trees on the south side of the property or a wall/fence
system.
Attachments:
Permit #12-0018 form, project drawings
Photos of Existing Building
Letter of Referral dated January 10, 2012
5
Página 33
City of Dover
January 10, 2012
Mr. Andreas Janke
15 Acorn Forest Drive
Felton, DE 19943
RE: Referral of Building Permit #12-18 to Historic District Commission
Proposed location of Frankfurt Bakery at 323 South Governors Avenue, Dover DE
Dear Mr. Janke:
This letter is to inform you that Building Permit application #12-18 has been referred to the
City of Dover Historic District Commission for consultation regarding the issuance of the
Architectural Review Certificate. Building Permit #12-18 was filed on January 5, 2012 for the
proposed exterior renovation project to the existing one story building and site improvements at
323 South Governors Avenue, Dover. The application seeks to apply a brick veneer and new
vinyl siding which now consists of concrete block and vertical wood siding; replace the entry
doors and windows on the front of the building; and other interior renovations.
The location of the subject property within the City of Dover’s Historic District zone requires the
review and issuance of an Architectural Review Certificate (ARC) for construction activities. For
certain types of activities such as these exterior renovations, the project is eligible for Staff
review of the ARC during the Building Permit application process. Project activities are
reviewed for compliance with the Design Standards and Guidelines for the City of Dover
Historic District Zone as stated in Zoning Ordinance, Article 10 Section 3.25(A).
3.25 Architectural review standards.
(A) An architectural review certificate may be issued if it is found that the architectural style,
general design, height, bulk and setbacks, arrangement, location and materials and structures
affecting the exterior appearance are generally in harmony with neighboring structures and
complementary to the traditional architectural standards of the historic district as set forth in the
historic district design guidelines and standards adopted by the planning commission and as set
forth in the United States Secretary of the Interior's Standards for Rehabilitation.
In reviewing the proposed project for Architectural Review Certification, Staff referenced the
Chapter 3: Maintenance, Repair, Preservation and Restoration of Existing Historic Buildings of
the Design Standards and Guidelines which present the Recommended, Not Recommended, and
Inappropriate approaches to work in the Historic District. Staff findings are summarized in the
Architectural Review Report. (See Attached.)
Based on the findings, Staff has concerns regarding issuance of the Architectural Review
Certificate for the project as presented in the permit application. As a result the City Planner is
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Página 34
Letter Re: Permit #12-18 at 323 South Governors Avenue
January 10, 2012
Page 2 of 2
referring the application to the Historic District Commission for review. See Zoning Ordinance,
Article 10 Section 3.22 (A) and (B) listed below.
Section 3.22 Architectural review certification by the city planner.
(A) An architectural review certificate for specific classes of building permits, including fences,
signs, siding, window and door replacement, roofing, the addition or replacement of
decorative features, minor demolition, residential additions, and other construction of a minor
nature, may be issued by the city planner, after a review and determination that the proposed
construction is in general accordance with the standards set forth in subsection 3.25
(B) The city planner may refer any permit application for demolition or construction in the historic
district for consultation with commission.
The City of Dover Historic District Commission will review this permit at their next
meeting scheduled for Thursday, January 19, 2012 at 3:00pm in the City Hall Conference
Room, 15 East Loockerman Street, Dover. You are encouraged to attend this meeting to
discuss the project. Staff will provide the Historic District Commission with the permit
application materials and other background information for their review and action.
If you have questions or concerns, please contact the Planning Office at (302)736-7196.
Sincerely,
Ann Marie Townshend, AICP
Director of Planning & Community Development
DEMW/amt
CC: Dawn E. Melson-Williams, AICP, Principal Planner
Permit File #12-0018
Historic District Commission