Página 1
UTILITY COMMITTEE
AGENDA
July 9, 2007 - 5:00 P.M. - Council Chambers - City Hall - City of Dover
Public comments are welcomed on any item and will be permitted at appropriate times.
When possible, please notify the City Clerk (736-7008 or e-m ail at Tm cdowell@dover.de.us)
should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. Tidewater Agreement
2. Updates
A. Brown Water
B. Verizon Franchise Agreement Negotiations
3. Adjournment by 6:00 P.M.
/tm
S:\ClerksOffice\Agendas&Minutes\Committee-Agendas\2007\07-09-2007 UTILITY.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO
INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Página 2
ACTION FORM
PROCEEDING: Utility Committee AGENDA ITEM NO.: 07-09-2007
DEPARTMENT OF ORIGIN: Public Utilities – Water DATE SUBMITTED: June 1, 2007
PREPARED BY: Ronald Lunt – Public Utilities Director
SUBJECT: Agreement with Tidewater Regarding Water Service Rights – Wilmington College
REFERENCE: N/A
RELATED PROJECT: Scarborough Road Interconnection (Tidewater Utilities)
APPROVALS: City Council
EXHIBITS: Agreement Regarding Water Service Rights
EXPENDITURE REQUIRED: N/A AMOUNT BUDGETED: N/A
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
TIMETABLE: City Manager to sign agreement following receipt of appropriate approvals.
RECOMMENDED ACTION: Approve agreement regarding water service rights with Tidewater
Utilities regarding service at the Wilmington College Property and authorize the City Manager and
Finance Director to execute the agreement.
BACKGROUND AND ANALYSIS
The City of Dover has served potable water and provided fire protection service to the Wilmington
College building located 3282 North DuPont Highway since March 2004. This building is located
within Tidewater Utility’s Certificate of Public Convenience and Necessity (CPCN) territory. As such,
City staff has been working with Tidewater to develop an equitable agreement which results in the
City receiving the right to serve this customer and Tidewater relinquishing its rights under the current
CPCN. The result of these negotiations is the Agreement Regarding Water Service Rights which is
attached. Conditions of this agreement include the following:
1. Construction of a twelve-inch (12”) diameter water main along the northern property line of
Wilmington College in an easterly direction to a proposed interconnection location with
Tidewater Utilities. (This project was completed in FY 2007.)
2. Construction of valves, vault(s) and meter(s) at the proposed interconnection location. (This
project is proposed for FY 2008. Work is to be completed by the Public Utilities Construction
Division and expenses are to be equally shared between the City of Dover and Tidewater
Utilities.)
Página 10
Water Quality Update
Utility Committee Presentation
July 9, 2007
Public Utilities Department
Water / Wastewater Utilities
Página 11
Water Quality Overview
Water Quality issues (i.e. brown water) began
in 2002 following implementation of
mandated chemical addition.
As is the case with other systems nationwide,
Dover’s water system was not designed for
chemical addition.
Complex system
3 aquifer sources
Multiple entry points (1 Water Treatment Plant and
15 unmanned wells with treatment)
Página 12
Water Quality Overview
Black & Veatch has been utilized as a Water
Quality Consultant to assist in analyzing the
system and finding solutions to brown water
issues.
“Magic Pill” or “Textbook” solutions do not
exist.
It will take the dedication of staff time and
financial resources to address all components
relating to this problem.
Página 13
Water Quality Expenses
1,800
1,600
EXPENSES (thousands)
1,400 COMPLAINTS
1,200
1,000
800
600
400
200
0
FY 2003 FY 2004 FY 2005 FY 2006 FY 2007
Página 14
Addressing the Problem – FY 2007
Additional Monitoring
Conducted additional system and well
monitoring and sampling
Flushing & Operations
Refined current flushing program for
improved control
Conducted three (3), month long system
wide flushing operations
Began design of Unidirectional Flushing
Program
Página 15
Addressing the Problem – FY 2007
Deep Well Contact Time
Well #13R – design complete, materials
bid and received, construction started
Wells #1, 2, 4, 7, 9 and 15 – design
complete
Wells #3, 6, 8, 10, 11 and 14 – design
started, easements required
Distribution System
Pipe material control (cement lined DIP)
Página 16
On the Job – FY 2007 B
A
Y
A
R
D
1
3 A
V
R E
N
U
E
Página 17
Taking on the Challenge – FY 2008
Additional Monitoring
Conduct additional
system and well
monitoring and
sampling
Black & Veatch to
perform analysis of
sampling data and set
up for in-house
utilization
Página 18
Taking on the Challenge – FY 2008
Flushing & Operations
Conduct three (3), month long
system wide flushing operations
Design and field testing for
Unidirectional Flushing Program
for 50% of the system (due to
new operator position)
Plot hydrant flushing data (due to
new GIS technician & engineer
positions)
Página 19
Taking on the Challenge – FY 2008
Distribution System
Pipe material control
(cement lined DIP)
Develop prioritization
system for ranking
rehabilitation projects
(due to new GIS
technician & engineer
positions)
Página 20
Taking on the Challenge – FY 2008
System Analysis
Black & Veatch to develop water
quality model
Installation of on-line analyzers
with contact chambers
Develop GIS database system
tracking (due to new GIS
technician & engineer positions)
Install new radios and antennas
to enable proper equipment
functioning
Página 21
Capital Improvements – FY 2008
Wellhead
Redevelopment
Program (capacity and
flow control)
Wellhead VFD
Upgrades (improved
flow control)
Remote Control &
Monitor Wells (flow
control)
Página 22
Capital Improvements – FY 2008
S. Governors Avenue Water
Main Upgrade
Water Quality
Improvements – Consultant
Perform sample data
analysis
Develop water quality
model
Complete contact chamber
design
Página 23
Capital Improvements – FY 2008
Water Quality
Improvements – Contact
Chambers
Well #13R – construct
Wells #1, 2, 4, 7, 9 and
15 – bid materials,
construct
Wells #3, 6, 8, 10, 11,
and 14 – easements
required
Página 24
Capital Improvements – FY 2008
Miscellaneous
Distribution System
Improvements
(capacity, flow
control, pipe
replacement)
Página 25
Desired Results and Resources
The improvements desired to the City’s water
system will require:
Increased, dedicated and long term financial resources.
FY 2008 Capital Budget = $1,476,700
Increased, dedicated and long term staffing resources.
FY 2008 Goals will require time from 40 Water /
Wastewater Utility staff members including
engineers, field crews, construction workers,
inspectors and water operators
Utilization of consultants and outside contractors to
meet critical time frames.
Página 26
CITY OF DOVER WATER QUALITY APPLICABLE EXPENDITURES
ACCOUNT # DESCRIPTION FY 2003 FY 2004 FY 2005 FY 2006 7/1/06-4/2/07 4/3/07 - 6/29/07 FY 2007 TO DATE FY 2008
417-6800-568.40-31 Wellhead Redevelopment Program $990.00 $150,961.29 $143,840.15 $23,838.98 $319,630.42 $45,000.00
Project #: by year (capacity and flow control)
Wellhead VFD Upgrades $122,000.00
(improved flow control)
Remote Control and Monitor Wells $139,700.00
(flow control)
417-6800-568.40-31 Water System SCADA Upgrade $192,198.00 $21,294.60 $213,492.60
Project #WS0301 (flow control)
417-6800-568.40-34 Division Street Water Main Upgrade $12,033.20 $8,498.73 $1,334,251.51 $1,354,783.44
Project #WD0304 (unlined pipe replacement)
417-6800-568.40-34 Dead End Water Main Removal $22,391.79 $22,391.79
Project #WD0306 (improved flow control)
S. Governors Ave. Water Main Upgrade $200,000.00
(main rehabilitation)
417-6800-568.40-34 Water Quality Evaluation $1,660.00 $77,407.64 $79,067.64
Project #WD0504 (system analysis)
417-6800-568.40-34 Water Quality Improvements $180,790.94 $51,969.92 $232,760.86 $232,760.86 $915,000.00
Project #: various (recommendation implementation)
417-6800-568.40-34 Misc. Distribution System Improvements $100.00 $56,440.04 $20,917.96 $25,391.96 $11,410.41 $36,802.37 $114,260.37 $55,000.00
Project #: by year (capacity, flow control, pipe replacement)
417 TOTAL $227,612.99 $180,854.62 $201,940.19 $1,456,416.09 $206,182.90 $63,380.33 $269,563.23 $2,336,387.12 $1,476,700.00
412-6800-568.20-51 Claims since 12/2002 $1,143.31 $3,376.00 $5,586.40 $2,939.41 $1,164.93 $38.00 $1,202.93 $14,248.05
(damaged laundry, etc.)
412-6800-568.30-25 Flushing Advertising $504.12 $5,309.70 $2,974.44 $9,592.00 $10,847.26 $4,493.04 $15,340.30 $33,720.56 $15,800.00
various Flushing Labor (In-house) (est.) $19,098.00 $106,948.80 $101,856.00 $165,516.00 $181,431.27 $181,431.27 $574,850.07 $187,000.00
412-6800-568 Flushing Supplies - Distribution (est.) $148.47 $742.10 $777.31 $265.98 $332.05 $598.03 $2,265.91 $750.00
412-7600-576 Flushing Supplies - WTP (est.) $1,177.46 $310.00 $310.00 $1,487.46 $500.00
412-7600-576 Sample Analysis Supplies (est.) $3,276.90 $4,521.48 $4,521.48 $7,798.38 $4,700.00
412 TOTAL $20,745.43 $115,782.97 $111,158.94 $183,279.08 $198,540.92 $4,863.09 $203,404.01 $634,370.43 $208,750.00
WATER QUALITY TOTAL $248,358.42 $296,637.59 $313,099.13 $1,639,695.17 $404,723.82 $68,243.42 $472,967.24 $2,970,757.55 $1,685,450.00
WATER QUALITY COMPLAINTS 271 627 906 369 541 2,714
Updated: 6-29-07 Public Utilities Department Page 1 of 1