SLC March 2022 draft minute
Parks, Recreation, and Community Enhancement Committee. 18 de enero de 2023.
Este texto se extrajo de el PDF de forma automática y puede contener errores. El PDF es el registro oficial, así que consúltelo antes de confiar en esto.
1 página tiene poco o ningún texto legible aquí, a menudo por ser escaneos o dibujos. Para verla, consulte el PDF.
Página 1
Silver Lake Commission
March 9, 2022
5:30 PM
In person & Via Weblink
* DRAFT *
Members Present Guests
John DeMarie Carolyn Courtney, Parks & Recreation Staff
Kathy Doyle Robin Eaton, Director Parks & Recreation
Marie Kozel Andrew Howard, Environmental Scientist, DNREC
Michael Lewis Dawn Melson‐Williams, Acting Planning Director
William Satchell Davis, Bowen & Friedel, Inc Staff
WELCOME & CALL TO ORDER
The meeting was called to order at 5:30 PM
MEMBER & STAFF INTRODUCTION
Mr. Eaton started the meeting and welcomed the members. With that said, the members and guests each gave a brief
introduction for their self and their affiliation to Dover.
REVIEW SILVER LAKE RESOLUTION & NOMINATE & SELECT CHAIRPERSON
Members reviewed the Silver Lake Resolution and were welcomed to call the office if they had any questions by Mr. Eaton.
The floor was opened for Chair nominations. Mr. Lewis nominated Ms. Kozel as Chairperson. With a second to the motion, Ms.
Kozel accepted the nomination. The motion passed without objection.
CONSIDERATION OF APPLICATION S‐22‐03 RESTAURANT AT 801 N STATE STREET
Mrs. Melson‐Williams gave a brief introduction of background on land use in the city, noting certain environmental aspects of
the code. In the case of various water bodies, there are setbacks so that development does not get to close and as part of the
zoning ordinance, there is a process of review to the site plan, if the property is next to Silver Lake, the application must come
before the Silver Lake Commission for review. This project is moving through process within the city with is a review of various
bodies. The application will go to a public hearing at the Planning Commission meeting. Review includes for example DELDOT
review due to access point off N. State Street. KCCD will also review for compliance with Delaware Sediment and
Stormwater management regulation. The city side having to get approvals for water & sewer services, the Planning Office is
looking at placement of building, adequate parking, tree planting & buffering requirements being met. You will hear from the
applicant tonight about their project. Ms. Kozel asked if the site is currently residential, has it already been rezoned? Mrs. MW
noted that is part of zoning process.
The application was then reviewed. This is a C2A zone area a limited central commercial zone. The proposal brought to us is for
a restaurant, one story building. The property was residential and was changed a few years ago. There will not be a re‐zoning
process. Land planning is necessary in this process at they are proposing a restaurant.
Mike (Davis, Bowen & Friedel) Brief outline of project, a restaurant. We are presenting a lower density project that will allow
for to do additional landscaping and onsite stormwater management. The building is design so that there are view of Silver
Lake. We do have outdoor dining in the plan. They intend to reestablish shoreline along the property. They are required to
install a new riparian buffer. They have worked with local landscape architect for this. The rendering was reviewed. (Attached)
Plan to install stone along the shore line, above that including biostable plantings will be used. All native species. All plantings
are utilizing native plantings and are meant to provide long term stability and absorb pollutants which will help the lake long
term.
Review and plan discussion took place. Mr. Lewis noted he is a resident of the adjacent to the property. He completely
understands this property will be developed. He noted the alley on the back side of the property and ask if there would be a
back door entrance to the property and when do you plan to begin construction? No, we do not plan to open the back of the
property/fence for accessing this parcel. Construction is expected to begin in the Fall of 2022, with appropriate approval from
DelDOT and the city. Mr. Lewis noted his appreciation for the detail in the plans and answer received this evening to his
questions.
Mrs. Doyle stated she was delighted to see put thought into the riparian buffer, asking who maintains this area. It was
answered, the restaurant owners are responsible. She talked about the current trees and tree requirements and what is in the
Página 2
current plan. They are planting new trees and keeping the established healthy trees. Mrs. Melson‐Williams noted a couple of
the ordinances and they had met those requirements with the present plan.
Mr. DeMarie noted he was looking yesterday at the site and the bald cypress tress that have been there serve as habitat. I am
concerned about how these trees and if they are being removed? With a response, it was noted the intent is to keep as many
trees as possible on the property without impact to the construction. Mr. DeMarie asked if a new dock would be put in? In
reply, it was noted the dock currently there will be removed with no plans to replace at this time. Hours of operation were
discussed. They will not be open past 10 PM and patrons of the restaurant will not have water access. Mr. Satchell asked if he
could walk the site to become more familiar with the area? In reply, yes he may do so. It was noted no access from Lepore’s
Road is planned.
Mrs. Melson‐Williams noted this is still in review process, and tonight they are looking for guidance and recommendations for
the Planning Commission to have for their review process. The information from this meeting will be provided. The public
hearing is set for March 24th. Members are welcome to attend. This is one of four applications Meeting participation is in
person and in‐person.
Mr. Eaton then recommended the commission member forward their comments via email to Ms. Courtney. Ms. Courtney will
collect the responses and forward as a package Mrs. Melson‐Williams onto the Planning Commission. Mr. Lewis motioned to
have all comments to Ms. Courtney by March 14. This was seconded and passed without objection.
UPDATE ON SILVER LAKE PARK PROJECTS & MAINTENANCE CREW UPDATES
Mr. Eaton noted we are doing things at the lake. The kayak dock is in and we are ordering an actual kayak launch. The beach
will have plantings that will be coming. Benches are ordered and I’d like to get those in. Yes, this is still funding with a grant
funding (50/50). Plants that are designed for this environment and wont grow so tall they block the view.
Some trees came down and we cleaned those up (north end of parking lot). We had a slide vandalized, we have replaced that.
In collaboration with the Library, we are doing a story walk. We are putting laminated pages out along the pathway. This our
third year of doing the walk. Using the existing post, we have new boxes coming in next week that will offer better protection
of the pages.
We have been in the park removing invasive species and vines that have crept in the park. Ms. Kozel noted she has seen lots of
clean up and city staff working in the park. Mr. Eaton noted a split rail fence was removed at the entrance (Washington St). He
has asked he crews to report on things we may need or not need in the park. We have volunteer groups that come in, for Bally’s
is coming soon. They will be helping with tree plantings, mulching, and overall clean up. Yes, native plants are being used.
This have been neglected and it’s a start to get the parks in good shape. General discussion on park trees, the dam, sink hole,
and amenities. The sewer leak has been resolved. The sink hole seems to be resolved as well. We are keeping an eye on that
area. There is no open hole at this point.
SPRING CLEAN UP EVENTS
Currently schedule clean up events include:
March 12 Holy Cross Honor Roll Students 8 am
March 19 The Legion of Anglers 8 am
April 9 Holy Cross Honor Roll Students 8 am
Members of the Commission are invited out to participate with these groups. Usually, they are here
from 8 am – Noon.
ADJOURNMENT
With no further business, the meeting adjourned at 6:42 PM.
Página 3
Area
Building Area: 6774 SF
Covered Patio: 907 SF
Tortilla Making
Merch. Storage Storage Office Mechanical
119
Dish Room 113 114 116 117
Retail/To Go
102
112
Seats
Entry
101 Dining: 212
Wait Support
111 Bar Seats: 24
Total: 236
Tortilla Dining
103
Cooler
c
Kitchen
Mens Prep & Pickup Prep Dry Goods/Commisary
109
104 110 115 118
Womens
105 Freezer
b
Main Dining
106
Keg Cooler
a
Private Event
107
El Azteca Dover
3 Season Bar Patio
Bar 002
108
Event Patio
001
Floor Plan & Renders
Level 1 Copy 1
1
1/8" = 1'-0"
REV REV DATE DESCRIPTION
Firm Name and Address :
Lighthouse Construction, Inc.
859 Golf Links Lane, Suite 1
Magnolia, DE
Project Name and Address :
El Azteca Dover
801N State Street
Dover, De 19901
Project : Sheet :
El Azteca Dover
Date :
Issue Date A100
Front Entrance Outdoor Dining
2 3 Scale :
12" = 1'-0" 12" = 1'-0" As indicated
Página 5
P:\Lighthouse\El Azteca\PRELIMINARY\EXISTING CONDITIONS.dwg Feb 04 , 2022 - 9:50am resd
DAVIS,
BOWEN &
FRIEDEL, INC. ARCHITECTS ENGINEERS SURVEYORS
Página 6
P:\Lighthouse\El Azteca\PRELIMINARY\PRELIMINARY PLAN.dwg Feb 04 , 2022 - 9:51am resd
0
20
40
60
DAVIS,
BOWEN &
FRIEDEL, INC. ARCHITECTS ENGINEERS SURVEYORS
Página 7
P:\Lighthouse\El Azteca\PRELIMINARY\PRELIMINARY PLAN.dwg Feb 04 , 2022 - 9:52am resd
0
20
40
60
DAVIS,
BOWEN &
FRIEDEL, INC. ARCHITECTS ENGINEERS SURVEYORS
Página 8
Silver Lake Park ‐ Scheduled Clean Up Events
March 12 Holy Cross Honor Roll Students 8 am
March 19 The Legion of Anglers 8 am
April 9 Holy Cross Honor Roll Students 8 am
Members of the Commission are invited out to participate with these groups. Usually, they are here
from 8 am – Noon.
Some pics of previous clean up events: