UTILITY COMMITTEE
AGENDA
May 29, 2007 - 5:00 P.M. - Council Chambers - City Hall - City of Dover
Public comments are welcomed on any item and will be permitted at appropriate times.
When possible, please notify the City Clerk (736-7008 or e-m ail at Tm cdowell@dover.de.us)
should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. Dedication of Rights-of-Way and Public Infrastructure - Fox Hall West
2. Update - Options to Address Regulation 1146 Emission Control Requirements
3. PACE/NAES
A. Update on Calculation Issue
B. Monthly Report (April)
4. Adjournment by 6:00 P.M.
/tm
S:\ClerksOffice\Agendas&Minutes\Committee-Agendas\2007\05-29-2007 UTILITY.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO
INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Página 2
ACTION FORM
PROCEEDING: Utility Committee AGENDA ITEM: 05/29/2007
DEPARTMENT OF ORIGIN: Public Services / Public Works DATE SUBMITTED: 5/22/2007
PREPARED BY: Scott D. Koenig, P.E., Public Services Manager
SUBJECT: Dedication of Rights-of-Way and Public Infrastructure – Fox Hall West (Phases IV & V)
REFERENCE: N/A
RELATED PROJECT: N/A
APPROVALS: City Manager
EXHIBITS: Attachment A – List of Public Improvements to be accepted by the City of Dover
Attachment B – Map
EXPENDITURE REQUIRED: $ N/A AMOUNT BUDGETED: $ N/A
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
TIMETABLE: All infrastructure improvements will become the responsibility of the City of Dover upon
action by City Council.
RECOMMENDED ACTION: Acceptance of dedication of rights-of-way and public infrastructure in Phases
IV & V of the Fox Hall West subdivision. Dedication is to include all of the referenced public improvements.
BACKGROUND AND ANALYSIS
The developer of the Fox Hall West Subdivision (Phases IV & V), Tony Ashburn, Inc., has requested that all
rights-of-ways and public infrastructure improvements related to this subdivision be dedicated to the City of
Dover for permanent ownership and maintenance. That attached map (Attachment B) shows the general
location and configuration of the subject rights-of-way. Tony Ashburn, Inc. has constructed all of the
improvements in accordance with City standards and specifications. After construction was completed, City
staff inspected the public improvements and provided the developer with a list of repairs to be made to meet the
City of Dover Standards and Specifications for Public Works Construction. As of this date, all work has been
completed by the developer. A one (1) year Maintenance Agreement, Maintenance Bond and a Release of
Liabilities have been submitted by the developer. In addition, as-built drawings have been submitted to the
Department of Public Works for their permanent records.
Página 3
DEDICATION OF RIGHTS-OF-WAY AND PUBLIC INFRASTURCTURE
FOX HALL WEST (PHASES IV & V)
ATTACHMENT A
The following is a list of all public improvements which are to be accepted by the City of Dover:
Sewer Utility Infrastructure (estimated construction value = $ 81,600.00):
8" PVC Sanitary Sewer Main - 2,946 l.f.
4” PVC Sanitary Sewer Laterals - 1,526 l.f. (48 laterals)
4' Diameter Sanitary Sewer Manholes - 13 ea. (78.23 v.f.)
Water Utility Infrastructure (estimated construction value = $ 100,500.00):
4” Ductile Iron Water Main - 165 l.f.
6” Ductile Iron Water Main - 337 l.f.
8” Ductile Iron Water Main - 3,383 l.f.
3/4” Type “K” Copper Water Service Line - 1,440 l.f. (48 services)
8” Gate Valves - 12 ea.
6” Gate Valves - 1 ea.
4” Gate Valves - 1 ea.
6” Hydrant Valves - 4 ea.
Fire Hydrants - 4 ea.
2” Blow Off Assembly - 1 ea.
Storm Water Infrastructure (estimated construction value = $ 104,500.00):
Yard Basins - 3 ea.
Single Catch Basins - 19 ea.
Double Catch Basins - 1 ea.
4’ Diameter Storm Water Manholes - 1 ea.
15” Type III Reinforced Concrete Pipe - 1,775 l.f.
18” Type III Reinforced Concrete Pipe - 125 l.f.
24” Type III Reinforced Concrete Pipe - 610 l.f.
30” Corrugated Metal Pipe - 150 l.f.
36” Corrugated Metal Pipe - 480 l.f.
Street Infrastructure: (0.69 miles) (estimated construction value = $ 406,700.00)
Carnoustie Road Station 00+00 to Station 15+08 l.f.
Shinnecock Road Station 00+00 to Station 17+05 l.f.
Hazeltine Road Station 00+00 to Station 02+40 l.f.
Burning Tree Road Station 17+00 to Station 18+90 l.f.
Total = 3,643 l.f.
Página 5
City of Dover
April Monthly Report
Asset, Energy and Risk Management
May 15, 2007
This Report was produced by Pace Global Asset Management, LLC (“Pace Global”) and is meant to be read as a whole and in
conjunction with this disclaimer. Any use of this Report other than as a whole and in conjunction with this disclaimer is
forbidden. Any use of this Report outside of its stated purpose without the prior written consent of Pace Global is forbidden.
Except for its stated purpose, this Report may not be copied or distributed in whole or in part without Pace Global’s prior written
consent.
This Report and the information and statements herein are based in whole or in part on information obtained from various sources
as of April, 2007. While Pace Global believes such information to be accurate, it makes no assurances, endorsements or
warranties express or implied, as to the validity, accuracy or completeness of any such information, any conclusions based
thereon, or any methods disclosed in this Report. Pace Global assumes no responsibility for the results of any actions and
inactions taken on the basis of this Report. By a party using, acting or relying on this Report, such party consents and agrees that
Pace Global, its employees, directors, officers, contractors, advisors, members, affiliates, successors and agents shall have no
liability with respect to such use, actions, inactions, or reliance.
This Report does contain some forward-looking opinions. Certain unanticipated factors could cause actual results to differ from
the opinions contained herein. Forward-looking opinions are based on historical and/or current information that relate to future
operations, strategies, financial results or other developments. Some of the unanticipated factors, among others, that could cause
the actual results to differ include regulatory developments, technological changes, competitive conditions, new products, general
economic conditions, changes in tax laws, adequacy of reserves, credit and other risks associated with City of Dover and/or other
third parties, significant changes in interest rates and fluctuations in foreign currency exchange rates.
Further, certain statements, findings and conclusions in this Report are based on Pace Global’s interpretations of various
contracts. Interpretations of these contracts by legal counsel or a jurisdictional body could differ.
over
25 Website: www.paceglobal.com
Washington New York Houston Columbia San Diego London Moscow Mexico City
Página 6
TABLE OF CONTENTS
Executive Summary ........................................................................................................ 2
Purchased Power and Energy Management................................................................... 5
Generation Management ................................................................................................ 8
Operations Management............................................................................................... 10
Risk Management ......................................................................................................... 16
Appendix 1 .................................................................................................................... 26
Power Purchases – Hedge Transaction Details ........................................................ 26
Appendix 2 .................................................................................................................... 28
PJM Invoice Breakdown ............................................................................................ 28
Appendix 3 .................................................................................................................... 29
North American Energy Services - April 2007 Monthly Report .................................. 29
Proprietary & Confidential 1 Dover Monthly PGAM Report April 2007 - Final
Página 7
EXECUTIVE SUMMARY
Generation, Operations and Asset Management
Net generation for the month of April credited by PJM was 85 MWh, as compared to a budget of 1,800
MWh. VanSant Unit 11 experienced a real time run for 2.7 hours on April 28th on dispatch by PJM. A
compressor off-line water wash was also performed on the Van Sant 11 just prior to its’ annual
maintenance outage. Unit 11 internal borescope inspections during the outage provided preliminary
feedback that appears positive. A final assessment and report on Unit 11 is due in May.
Generation v Budget
15000
12000
MWh
9000
6000
3000
0
06 07 07
20 20 20
ly n ly
Ju Ja Ju
Actual Gen Budget Gen
During the month of April, North American Energy Services (“NAES”) reported that there were no lost
time accidents, OSHA reportable incidents or environmental Notice of Violations. The Employee-Plant
Safety Committee held a lunch time cook-out in April to commemorate two years of accident free
operation. The plant was notified by DNREC that they had approved an alternate procedure for
monitoring the McKee Run Fuel Oil Tank #1 and Oil Inventory until an out of service inspection can be
completed. This inspection must be completed no later than June 1, 2008. NAES and PACE are studying
scenarios to optimize the remaining #6 fuel oil inventory prior to the June 2008 deadline.
Costs attributable to the operations of the McKee Run and VanSant stations for April were $130,991
below a budget of $443,106 due to favorable variances in personnel, administrative, EH&S, maintenance
and operating costs. For power year 2006-07, operations are $916,293 below a budget of $4,687,228.
Energy Management
Wholesale load for the month of April was 56,152 MWhs versus a three year historic load of 56,000
MWhs. Purchased power (or hedges) accounted for 60,720 MWhs of this volume at a cost of $4.47
million. Purchases and sales as well as other PJM related charges accounted for an additional credit of
$77,370, inclusive of all load related fees. Total purchased power cost for the month of April was $4.61
Proprietary & Confidential 2 Dover Monthly PGAM Report April 2007 - Final
Página 8
million resulting in an all in monthly cost of power (including fees) of $82.19/MWh, or $1.81/MWh
below the targeted annual average of $84.00/MWh.
Dover Load v 3 Year Average Load
100,000
75,000
MWh 50,000
25,000
0
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Average
Proprietary & Confidential 3 Dover Monthly PGAM Report April 2007 - Final
Página 9
Risk Management
PJM wholesale power prices continued to experience upward movement throughout the forward price
periods since the last reporting period (ending 4/19/07). For example, the average forward on-peak
price for the upcoming Power Year 2008/2009 increased by $2.00 per MWh, or 2.2 percent, while the
average forward Off peak price for the Power Year 2008/2009 increased by $1.48 per MWh, or 1.7
percent. This upward movement is indicative of the persistent market volatility that the City’s risk
management program is designed to manage. The City’s expected wholesale cost-of-service for 2007-
08 and 2008-09, and to a lesser extent for 2009-10, is significantly insulated from such adverse price
movements.
Pace Global and the City have implemented several major components of a comprehensive hedging
strategy for power year 2008-09 and beyond. At the April 19 ERMC meeting, the structure and
objectives of the program were ratified; these consist thus far of integrated programmatic and
discretionary hedging decision protocols designed to work together to ensure stable, predictable power
prices for the City’s ratepayers for the next several power years. Pace Global anticipates that the
program structure will be enhanced at the next ERMC meeting to include defensive hedging protocols.
The first element of the programmatic hedging strategy targeting peak usage was implemented in two
sets of purchases on April 24 and May 8.
Load Cost v Budget Cost
87.00
EOY Projection
= $82.90/MWh
85.00
$/MWh 83.00
81.00
79.00
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Weighted Average Budget
Proprietary & Confidential 4 Dover Monthly PGAM Report April 2007 - Final
Página 10
PURCHASED POWER AND ENERGY MANAGEMENT
Monthly Market Management Highlights
• Aggregate Day Ahead demand was up slightly from last month. Favorable real time purchases
resulted in load following costs well-below budget despite a volatile Real Time PJM market.
The City of Dover should expect invoices from the suppliers with whom they have entered into electric
supply deals. The table below provides a list of counterparties, price, and the total cost per deal. The
City of Dover was over hedged for the month of April, resulting in an overall PJM invoice credit for the
credit of $77,370.
April Hedges or Purchased Power
Counterparty Volume (MWh) Average Cost Cost to Dover
($/MWh) ($ millions)
BP 18,000 72.89 $1.312
Constellation 26,400 77.32 $2.041
Integrys 16,320 68.20 $1.113
Connective (Capacity Only) 354 MW $5.00/MW.d $.00177
Total Energy Purchases 60,720 73.59 $4.468
Dover Load 56,152
Load Cost v Budget Cost
87.00
EOY Projection
= $82.90/MWh
85.00
$/MWh 83.00
81.00
79.00
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Actual Weighted Average Budget
Proprietary & Confidential 5 Dover Monthly PGAM Report April 2007 - Final
Página 11
PJM Power Balancing and Load Related Fees
Purchased Power (Hedges): 60,720 MWh’s @ $73.59/MWh: $4,468,081
Power Balancing and Additional PJM Related Credit: ( $77,370)
Total Cost to Serve Load (60,720 MWh’s) $4,390,711
All in $/MWh load cost inclusive of all fees: $82.19/MWh
Actual Dover load of 56,152 MWh was 0.27% above the 3 year historic load of 56,000 MWh.
The April Cost of Service of $82.19 yields and end of year projection cost of $82.90 based on ten
months of actuals and two months of projections. This is below the 2006-2007 target of $84.00.
Purchased Fuel and Transportation
Natural gas commodity spot purchases were necessary to supply gas to Van Sant Unit 11 to support the
April 28th real time run, as well as to provide gas to VanSant Unit 11 during the pre-outage water-wash.
The weighted average incurred gas price for 1,375 Dth was $8.80 per Dth.
Spot Gas Purchases
Date Volume (Dth) Price ($/Dth) Total Commodity
Cost ($)
27-Apr 375 $7.48 $2,805.00
28-Apr 1,000 $9.30 $9,300.00
Totals 1,375 $8.80 $12,105.00
Gas was also separately purchased on a firm basis to maintain the No.6 fuel oil inventories at McKee Run
at approximately 140 degrees. This firm delivery base load gas supply has been purchased from Sempra
Energy. The Details of this deal are as follows:
Firm Gas Supply Price Per dth Total Cost
50 dth/day $7.73 $11,592
Gas Transportation Purchased
Eastern Shore Natural Gas Pipeline and TransCo agreements provide for deliveries to the McKee Run and
VanSant stations. These charges include a firm demand charge and prior period adjustments as follows:
ESNG FT Demand Charge $4,038
TransCo FT Demand Charge $4,302
Total Purchases $8,340
Proprietary & Confidential 6 Dover Monthly PGAM Report April 2007 - Final
Página 12
Other Gas Purchases
For the month of April 2007, Eastern Shore’s cash out is as estimated below. PGAM made every effort to
minimize the cash out. Commodity and transportation imbalances and demand charges on Eastern Shore
Pipeline for the month resulted in a cost of $2,473.36 to the City, and are summarized as follows.
Imbalance (dth) Estimated $/dth Estimated Total Cost
265 $8.55 $2265.75
Transport Volume Estimated $/dth Estimated Total Cost
Firm 2,791 $0.0168 $46.89
IT 274 $0.5866 $160.72
Purchased Commodity Fuel Oil Summary
No oil was burned in the month of April. The volumes provided below are estimated to reflect the end on
month inventories.
Number 2 fuel oil has been purchased due to the significant rise in the price from the level of $1.87/gallon
as quoted to the Management Committee on April 20th. The current market price sits at $2.00/gallon.
PGAM continues to monitor the market daily in order to procure supply at more attractive pricing levels.
Tank Inventory Estimates as of April 30
Days of Full Load
Tank Tank Capacity (gal) Inventory (gal) Burn (24 Hours)
#6 Oil 2,554,105 1,207,208 9
#2 Oil 258,000 116,848 4
April 2007 Burns
Date #6 Oil Burns Inventory Market Price Inventory Market Cost
(gal) Price ($/gal) ($/gal) Cost
NA NA NA NA NA NA
Proprietary & Confidential 7 Dover Monthly PGAM Report April 2007 - Final
Página 13
GENERATION MANAGEMENT
Monthly Generation Management Highlights:
• Van Sant Unit 11 was dispatched for 2.7 hours on April 28th realizing a generation
production margin of $882, on a unit production margin of $10.39/MWh sold.
• One thousand tons of 2006/2007 vintage SO2 allowances were sold on April 19th. This sale
included 673 tons of 2006 vintage SO2 allowances and 327 of 2007 vintage SO2 allowances.
The transaction netted $466.50 per ton or $466,500 for the City. Dover generation has 2385
tons of SO2 allowances remaining in 2007.
Generation Financial Performance
Per the table below, the VanSant station experienced a generation production margin of $456 on power
sales of 85 MWh for the month of April. The average realized unit generation production margin was
$5.37 per MWh.
Generation Production Margin
Transaction Volumes Revenue/(Cost)
PJM Invoice for Power Sold 85 MWh’s $11,822.92
Gas 1225dth ($10,780.00)
#6 Oil 0 gal $0
#2 Oil 0 gal $0
IT Transport 0 dth ($160.72)
Generation Production Margin 85 MWh’s $882.20
1. Historical actual results have been amended to reflect oil usage to reflect corrected oil use data.
2. Chart includes out of merit dispatch from October 06 to January 07.
Ge ne ration Production Margin v s Budge t
500
450
400
350
300
250
200
150
100
$
100
0 50
0
J
u A S O N D J
a F M A M J
ly ug e c o e n eb a p a u
n
u p to v c u ru rc ril y e
-50
s te b e
m e
m a h
t m er b b ry a
b e e ry
-100 er r r
-150
-200
-250
-300
-350
-400
Budget Actual
Chart includes out of merit dispatch from October 06 to January 07.
Proprietary & Confidential 8 Dover Monthly PGAM Report April 2007 - Final
Página 14
Non-Production Energy Revenues and Costs
The following non-production energy revenues and costs are generally fixed and not directly related to
generation dispatch and power production.
Generation Fixed Cost
Transaction Volumes Revenue/(Cost)
PJM Invoice (Black Start) NA $4,977.77
Eastern Shore FT 1875 dth ($4,037.78)
Transco 3100 dth ($4,302.60)
Gas 1875 dth ($15,231.64)
Total Fixed Cost ($18,594.24)
1. Gas use was for #6 FO heating a pre-outage water wash
Emissions and Allowance Management
One thousand tons of 2006/2007 vintage SO2 allowances were sold on April 19th, resulting in the current
emissions allowance balances shown in the table below. This sale included 673 tons of 2006 vintage SO2
allowances and 327 of 2007 vintage SO2 allowances. Dover generation has 2385 tons of SO2 allowances
remaining in 2007.
EMISSIONS & ALLOWANCE SUMMARY
Allowance Allowance Emissions Emissions Allowances Allowances Allowance
Vintage Allocation Month YTD Sold Month Sold YTD Balance
SO2 – 2006 2725 n/a 521 673 2673 0
SO2 – 2007 2723 0 11 327 327 2385
NOx – 20072 198 0 0 0 0 198
Notes:
(1) An adjustment to the fuel oil sulfur content resulted in a lowering of SO2 emissions estimates for 2006.
(2) NOx emissions pertain only to Seasonal emissions (May 1 – Sep 30)
On April 19th, a sale of 1,000 tons of 2006/2007 vintage SO2 allowances was made to Louis Dreyfus
Energy Service, LP. The transaction netted $466.50 per ton or $466,500 for the City. Combined with the
170 tons NOx credits sold in 2006 for $950 net per ton (yielding $161,500) and the prior 2000 ton SO2
sale (yielding $853,500), net emissions allowance sales revenue for the 2006-07 power year is $1,481,500
After the transactions referenced above, the City of Dover has 2,385 vintage 2007 SO2 allowances
remaining. If McKee Run and Van Sant units experience operating conditions similar to 2006, the City of
Dover will have approximately 2,350 excess 2007 vintage SO2 allowances this year.
No activity occurred with respect to City of Dover NOx allowances. Note that NOx allowance retirement
is only applicable to generation during the Ozone Season or generation between May 1 and September 30
of each calendar year. For 2007, the City of Dover has 198 tons of NOx allowances. Based on previous
year operating statistics, approximately 173 tons of NOx allowances will be available for trade.
SO2 price have been steadily rising over the last two weeks and are currently approximately $585 per ton.
Current NOx allowance market prices are stable between $950 and $1000 per ton. PGAM and the City
will discuss timing for additional allowance sales.
Proprietary & Confidential 9 Dover Monthly PGAM Report April 2007 - Final
Página 15
OPERATIONS MANAGEMENT
Monthly Operations Management Highlights:
• Van Sant Unit 11 operated for 2.7 hrs, producing 85 MWh for sale into the PJM real time
market.
• There were no lost time accidents, OSHA reportable incidents or environmental Notice of
Violations associated with the generation stations in April.
• We completed the annual outage on Unit 11 on time and ahead of the anticipated scheduled. Prior
to the outage, an off line water wash was performed on the compressor at VanSant. During the
outage, we received our annual borescope inspection from Advanced Turbine Support, Inc., with
no red flags showing up.
• NAES and Pace conducted PJM Operator training during the month of April, and operators
continue with monthly online PJM training in order to meet PJM training requirements and for
further exam preparation.
• The Employee-Plant Safety Committee conducted a lunch time cook out to commemorate two
years of accident-free operation. Dover Mayor Steven Speed, Dover City Manager Tony DePrima
and representatives of Pace Global, Fred James and Keith Mills were among the honored guests in
attendance to acknowledge the two-year milestone.
• The plant was notified by the DNREC Tank Management Branch that they had approved an
alternate procedure for monitoring the McKee Run Fuel Oil Tank #1 and Oil Inventory until an
Out-of-Service Tank inspection can be completed. The inspection must be completed no later than
June 1, 2008.
Proprietary & Confidential 10 Dover Monthly PGAM Report April 2007 - Final
Página 16
Operations Summary
Generation Unit performance for the month of April is provided below:
Monthly Operations Summary – April 2007
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 0 0 0 0 2.7 2.7
Starts # 0 0 0 0 2 2
Gross Generation MWh 0 0 0 0 85.477 85.477
Net Generation MWh 0 0 0 0 85.048 85.048
Total Auxiliaries MWh 31.528 31.528 148.186 211.242 30.896 242.138
Auxiliaries purchased MWh 31.528 31.528 148.186 211.242 30.467 241.709
Fuel Gas Used MMBTU 0 0 0 0 1258.04 1258.04
Fuel Oil Used MMBTU 0 0 0 0 0 0
Fuel Oil Used Gallons 0 0 0 0 0 0
Total Fuel MMBTU 0 0 0 0 1258.04 1258.04
Net Heat Rate BTU/KWh NA NA NA NA 14792 14792
Unit Trips # 0 0 0 0 0 0
Capacity Factor % 0.0% 0.0% 0.0% 0.0% 0.30% 0.07%
Availability Factor % 100% 100% 100% 100% 85.79% 96.45%
eFOR % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
HW Boiler Gas Usage MMBTU 1,738.00 1,738.00
Pilot Gas Usage MMBTU 0 0 0 0
Unit Trips/Outages/Operations
During the month, Unit 11 was operated for 2.7 hours on April 28 on dispatch by PJM. In addition, a
compressor off-line water-wash was performed on the unit early in the month and just prior to its’ annual
maintenance outage.
In April, the Unit 11 Annual Outage was completed during which a borescope inspection was performed
on the compressor. Preliminary feedback from the inspector as to the condition of the unit was very
positive. Final results and an assessment of the unit is expected in early May. Other outage work
included the calibration of instrument transmitters and gauges, inspection of the stack, inspection of
electrical bus work, GE TIL work and preventative maintenance on all rotating electrical and mechanical
equipment.
Other Events
We had several members of our staff attend a two day training session at the General Physics facility to
gain the knowledge to set up the plant on the GPILearn on-line training system. Since their return to the
plant, a course schedule has been set up and staff members will begin begun taking the on-line instruction
courses in early May, 2007. The General Physics website based training will be utilized in several plant
programs including the Operational Readiness Plan and the Employee Development and Qualification
Program (EDQP) as well as meeting annual OSHA training requirements.
Proprietary & Confidential 11 Dover Monthly PGAM Report April 2007 - Final
Página 17
After months of discussion and providing information to the DNREC Tank Management Branch, they
have approved an alternate procedure to be followed until an Out-of-Service Inspection can be completed
on the McKee Run Fuel Oil Tank #1. Under the alternate procedure, the plant will need to supply
DNREC with visual inspection documentation and oil tank inventory information on a monthly basis until
the Out-of-Service Inspection is completed. We have been mandated by DNREC to have this inspection
completed no later than June 1, 2008.
A meeting with the DNREC Air Quality Management Branch was held to discuss the Delaware
Regulation 1146 Compliance Plan presented by the City of Dover for Unit 3 in March. DNREC had
evaluated the options and this meeting was an opportunity to discuss their evaluation with the City of
Dover representatives. Based on these discussions, a compliance plan continues to be developed further
by the City of Dover with input from NAES and Pace Global personnel.
In our efforts to continuously improve, we continue to investigate installation of Automatic Generation
Control (AGC) on Unit 3 and on Unit 11. This improvement, if achievable, would provide an even
greater value to these units during periods of operation. Also included in the improvement effort, we have
been actively been working with Pace Global to develop competitive bidding strategies in the PJM market
that could provide more operating opportunities for all our units, thereby increasing electric generation
revenue. Some of these strategies have been implemented since our initial discussions and we expect to
see positive results from these in the near future.
The final version of the XL Insurance Report was provided to the plant in April with several
recommendations. Some of these findings have already been addressed and other findings are being
researched to determine best methodology of completing the tasks. The insurance inspectors were very
impressed with the condition of the plant and have provided additional information and recommendations
in the timing of major inspections on the McKee Run steam turbines.
The Employee-led Plant Safety Committee and the Maintenance Staff were recipients of a fantastic
breakfast prepared by Phil Marvel, Plant Electrician and Dean Blaha, Plant Manager. The breakfast was
offered up in the Plant’s 2006 United Way Silent Auction by Phil (2006 Plant United Way Chairman) and
Dean as a way to raise funds for the Plant’s United Way Campaign. The breakfasts were purchased by
Paul Greenage, Maintenance Supervisor and Ken Beard, O & M Manager who then invited the teams to
be their guests for the feast. Plant staff continues to support the United Way and its’ mission and is
currently planning for the coming campaign year.
Leading Edge Turbine Technologies (LETT) has received the fuel nozzles for inspection, flow testing and
repairs. The repairs should take four to eight weeks and once the nozzles are returned, they will be placed
into the plant inventory as a spare set. We have asked for an analysis from LETT to help us determine the
exact cause of the damage to the fuel nozzles. We have yet to receive this analysis.
Proprietary & Confidential 12 Dover Monthly PGAM Report April 2007 - Final
Página 18
Generation Unit performance for the fiscal year 2006-07 to date is provided below:
Fiscal Year to Date 7/1/06-6/30/07
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 184.134 190.018 441.026 815.178 115.054 930.232
Starts # 6 5 23 34 37 71
Gross Generation MWh 1,499.154 1,580.808 22,198.381 25,278,343 3,643.055 28,921.398
Net Generation MWh 1,406.823 1,482.405 20,259.787 23,149.015 3,621.138 26,770.153
Total Auxiliaries MWh 420.312 426.384 3,992.299 4,838.995 318.787 5,202.369
Auxiliaries purchased MWh 327.981 327.981 2,053.705 2,709.667 296.870 3,051.124
Fuel Gas Used MMBTU 13,478.64 17,386.555 153,605.208 184,470.403# 43,362.033 227,832.437#
Fuel Oil Used MMBTU 8,547.961 3,177.772 88,658.168 100,383.902 5,246.186 105,630.089
Fuel Oil Used Gallons 57,177 21,256 590,982 669,415 37,933 707,348
Total Fuel MMBTU 22,026.601 20,564.327 242,263.377 284,854.306# 48,608.22 333,462.526#
Net Heat Rate BTU/KWh 15,657 13,872 11,958 12,305 13,423 12,457
Unit Trips # 4 1 1 6 9 15
Capacity Factor % 1.13% 1.20% 2.72% 2.33% 1.27% 2.10%
Availability Factor % 97.96% 98.60% 98.12% 98.23% 97.85% 98.13%
eFOR % 0.96% 3.00% 0.47% 0.85% 0.0% 0.66%
HW Boiler Gas Usage MMBTU 18,058.224 18,058.224
Pilot Gas Usage MMBTU 526,200 822,562 1,348.762 1,348.762
# Note: Does not include HWB or Pilot Gas. Fuel usage numbers are taken from fuel flow instruments
Environmental, Health and Safety
During the month of April, there were no employee or contractor related injuries or illnesses. As a follow
up to the emergency evacuation drill held at the McKee Run facility during the month of March, we have
purchased status boards for employees and visitors to help us identify all individuals on site at all times.
The boards have magnetic buttons to indicate whether or not employees are IN or OUT of the building.
All employees should be trained in the use of the new attendance system and the boards should be in full
use by May 12, 2007.
The Employee-Plant Safety Committee conducted a lunch time cook out to commemorate two years of
accident-free operation. Dover Mayor Steven Speed, Dover City Manager Tony DePrima and
representatives of Pace Global, Fred James and Keith Mills were among the honored guests in attendance
to acknowledge the two-year milestone.
The plant was notified by the DNREC Tank Management Branch that they had approved an alternate
procedure for monitoring the McKee Run Fuel Oil Tank #1 and Oil Inventory until an Out-of-Service
Tank inspection can be completed. The inspection must be completed no later than June 1, 2008. The
DNREC Tank Management Branch has requested monthly data collection and submission of the data to
the department until the inspection has been completed. The plant will compile this information and send
to DNREC at the end of each month in order to honor their request
Quarterly EDR’s (Electronic Data Reports) were filed for McKee Run Unit 3 and VanSant Unit 11. The
audit feedback from the EPA and the Clean Air Market Division MDC check (Monitoring Plan Data
Checking Software) stated that no errors were found.
Proprietary & Confidential 13 Dover Monthly PGAM Report April 2007 - Final
Página 19
There were no Notice of Violations, Environmental excursions or Near Miss reports during the month of
April.
Operations Financial Summaries
Operating Costs for the month of April were $312,115 against a budget of $443,106. A favorable
variance in personnel, administrative, EH&S, maintenance and operations contributed to this variance.
Power Year to Date variances are favorable by $916,293, based on actual costs of $3,770,935 against a
budget of $4,687,228. Summaries for the month and year to date are as follows.
Financial – Current Month
Month – April 2007
Actual Budget Variance
Personnel 223,573 245,115 21,542
Administrative 32,190 98,019 65,829
EH & S 894 2,500 1,606
Maintenance Expense 41,988 60,550 18,562
Operations Expense 13,470 36,922 23,452
Total $312,115 $443,106 $130,991
Financial – Fiscal Year to Date
Number of Months - 10
Actual Budget Variance
Personnel 2,408,334 2,683,269 274,935
Administrative 760,845 864,674 103,829
EH & S 69,702 68,000 (1,702)
Maintenance Expense 388,768 556,000 167,232
Operations Expense 143,286 515,285 371,999
Total $3,770,935 $4,687,228 $916,293
Analysis of Budget Variance
For the month of April, NAES had a favorable variance of $130,991. The variance was due to the
following:
PERSONNEL EXPENSES – Favorable variance of $21,542 due to lower overtime and burdens due to
low run time that accounted for the majority of the total variance.
ADMINISTRATIVE EXPENSES - Favorable variance of $65,829 which was partially due to insurance
premiums budgeted on a monthly basis were paid in a lump sum payment in August. Also, money
budgeted in April for the fuel oil tank inspection (50K) was actually spent in January.
ENVIRONMENTAL, HEALTH, AND SAFETY EXPENSES - Favorable variance of $1,606 due to a
zero non-hazardous waste disposal expense and no water sampling invoices.
MAINTENANCE EXPENSES- Favorable variance of $18,562 due to the City of Dover crediting a few of
the major accounts for items that were previously charged out to these accounts but were actually
inventory purchases. Expenses for some of the other maintenance accounts were lower due to minimal run
time.
Proprietary & Confidential 14 Dover Monthly PGAM Report April 2007 - Final
Página 20
OPERATING EXPENSES – Favorable variance of $23,452 due primarily to not being billed for McKee
Run auxiliary electric usage and for low water usage (limited operational run time). This has been
corrected with the City Electric Department and we should expect to receive McKee Run electric bills in
future months.
Proprietary & Confidential 15 Dover Monthly PGAM Report April 2007 - Final
Página 21
RISK MANAGEMENT
PJM wholesale power prices continued to experience upward movement throughout the forward price
periods since the last reporting period (ending 4/19/07). For example, the average forward on-peak
price for the upcoming Power Year 2008/2009 increased by $2.00 per MWh, or 2.2 percent, while the
average cost of service for the Power Year 2008/2009 increased by only $1.48 per MWh, or 1.7 percent,
due to the mitigating effect of the City’s hedges. This upward movement is indicative of the persistent
market volatility that the City’s risk management program is designed to manage. The City’s expected
wholesale cost-of-service for 2007-08 and 2008-09, and to a lesser extent for 2009-10, is significantly
insulated from such adverse price movements.
Pace Global and the City have implemented several major components of a comprehensive hedging
strategy for power year 2008-09 and beyond. At the April 19 ERMC meeting, the structure and
objectives of the program were ratified; these consist thus far of integrated programmatic and
discretionary hedging decision protocols designed to work together to ensure stable, predictable power
prices for the City’s ratepayers for the next several power years. Pace Global anticipates that the
program structure will be enhanced at the next ERMC meeting to include defensive hedging protocols.
The first element of the programmatic hedging strategy targeting peak usage was implemented in two
sets of purchases on April 24 and May 8.
Proprietary & Confidential 16 Dover Monthly PGAM Report April 2007 - Final
Página 22
2006 - 2007 Power Year Hedge Position
As of May 10th, estimated power consumption for Power Year 2006-07 was hedged at 100 percent on
peak and 101 percent off peak. Hedge volumes are based on the three year historical load profile of
Dover at the Dover bus prior to any distribution losses to the retail meter. As shown in the table below,
these hedge positions produce an estimated all-in wholesale price to Dover of $82.90 per MWh for the
2006-07 power year, inclusive of all Pace budgeted fees. Despite the acute PJM market price increase,
Dover’s power cost is down $0.11 per MWh relative to last month as the hedge positions shielded the
City and its customers, and due to a reduction in ancillary costs. The “Current Expected” price outcome
remains below the budgeted figure of $85.24 per MWh (including Incentive Fees). The ten day value at
risk (VaR) indicates that this value could increase to $83.87 per MWh, given a “worst case” possible
adverse market movement in commodity and load following costs. That “At Market + Risk” result
would still be $1.37 per MWh below budget.
Forward Hedge % Power Year 2006-07
Date: 05/09/2007 Peak 100%
Off Peak 101%
At Market At Market + Risk*
Energy Cost(including Load Following) $75.62 $76.59
Incentive Non-Energy Items
LSE Capacity $0.01 $0.01
Load Following
FRC Margin $0.00 $0.00
$0.01 $0.01
Pass-Through Items
Transmission $2.25 $2.25
Ancillary $1.02 $1.02
Losses $0.00 $0.00
$3.27 $3.27
Add Pace Fees $2.76 $2.76
Total Cost $81.66 $82.63
Add Incentive $1.24 $1.24
Current Expected $82.90 $83.87
* Includes estimate of 10-Day VaR & Load Following Risk.
Includes actuals through April and projections through June.
* Includes
Paceestimate of 10-Day
Incentive VaR & LFbudgeted
Fee represents Risk amount.
Includes actual through March 2007
Proprietary & Confidential 17 Dover Monthly PGAM Report April 2007 - Final
Página 23
2006 – 2007 Month-by-Month Hedge Transactions
Off-Peak Power, Dover Zone 5/9/2007 On-Peak Power, Dover Zone 5/9/2007
Hedge Hedge
Total Fixed Total Fixed
Period Ratio Period Ratio
06-07 Volume Volume 06-07 Volume Volume
(MWh) (MWh) (MWh) (MWh)
Jul-06 39,472 42,400 107% Jul-06 39,074 41,600 106%
Aug-06 34,547 37,600 109% Aug-06 45,943 47,840 104%
Sep-06 33,474 30,000 90% Sep-06 35,575 32,000 90%
Oct-06 27,712 29,400 106% Oct-06 32,603 33,440 103%
Nov-06 26,939 28,800 107% Nov-06 30,030 31,920 106%
Dec-06 32,041 31,800 99% Dec-06 28,816 30,400 105%
Jan-07 31,518 29,400 93% Jan-07 34,476 33,440 97%
Feb-07 27,267 26,400 97% Feb-07 30,279 30,400 100%
Mar-07 28,399 29,400 104% Mar-07 31,984 33,440 105%
Apr-07 26,122 28,800 110% Apr-07 29,624 31,920 108%
May-07 29,005 29,400 101% May-07 34,663 33,440 96%
Jun-07 32,038 28,800 90% Jun-07 38,389 31,920 83%
Total 368,534 372,200 101% Total 411,456 411,760 100%
Proprietary & Confidential 18 Dover Monthly PGAM Report April 2007 - Final
Página 24
2007 - 2008 Power Year Hedge Position
For power year 2007-2008, the estimated power consumption is hedged 91 percent on peak and 80
percent off peak. Hedge volumes are based on the three year historical load profile at the Dover bus
prior to any distribution losses to the retail meter. As shown in the table immediately following, the all
in price to Dover at these hedge levels is estimated at $85.36/MWh, inclusive of all incentive fees. The
$84.12 cost of service has changed by $0.10 per MWh versus the last report, as the 91 percent on peak
hedge position lowered the volatility and protected the City from the recent $1.18/MWh movement in
PJM forward market prices for this period. The 10 day value at risk (inclusive of potential adverse
market movements in commodity and load following) could increase this target number to
$86.26/MWh.
Forward Hedge % Power Year 2007-08
Date: 05/09/2007 Peak 91%
Off Peak 80%
At Market At Market + Risk*
Energy Cost(including Load Following) $77.03 $79.17
Incentive Non-Energy Items
LSE Capacity $0.01 $0.01
Load Following
FRC Margin $0.00 $0.00
$0.01 $0.01
Pass-Through Items
Transmission $2.24 $2.24
Ancillary $2.00 $2.00
Losses $0.00 $0.00
$4.24 $4.24
Add Pace Fees $2.84 $2.84
Total Cost $84.12 $86.26
Add Incentive $1.24 $1.24
Current Expected $85.36 $87.50
* Includes estimate of 10-Day VaR & LF Risk
Proprietary & Confidential 19 Dover Monthly PGAM Report April 2007 - Final
Página 25
2007 – 2008 Month-by-Month Hedge Transactions
Off-Peak Power, Dover Zone 5/9/2007 On-Peak Power, Dover Zone 5/9/2007
Hedge Hedge
Total Fixed Total Fixed
Period Ratio Period Ratio
07-08 Volume Volume 07-08 Volume Volume
(MWh) (MWh) (MWh) (MWh)
Jul-07 39,867 30,600 77% Jul-07 39,464 40,320 102%
Aug-07 34,892 28,200 81% Aug-07 46,402 44,160 95%
Sep-07 33,809 29,120 86% Sep-07 35,930 33,440 93%
Oct-07 27,989 22,560 81% Oct-07 32,929 31,280 95%
Nov-07 27,208 23,040 85% Nov-07 30,330 28,560 94%
Dec-07 32,362 25,440 79% Dec-07 29,105 27,200 93%
Jan-08 31,834 25,480 80% Jan-08 34,821 29,920 86%
Feb-08 27,539 23,400 85% Feb-08 30,582 28,560 93%
Mar-08 28,683 22,440 78% Mar-08 32,303 23,520 73%
Apr-08 26,383 20,240 77% Apr-08 29,920 24,640 82%
May-08 29,295 24,480 84% May-08 35,010 28,560 82%
Jun-08 32,358 23,040 71% Jun-08 38,773 36,960 95%
Total 372,219 298,040 80% Total 415,569 377,120 91%
Proprietary & Confidential 20 Dover Monthly PGAM Report April 2007 - Final
Página 26
2008 - 2009 Power Year Hedge Position
For power year 2008-2009, the estimated power consumption is hedged 38 percent on peak and 19
percent off peak. Hedge volumes are based on the three-year historical load profile at the Dover bus
prior to any distribution losses to the retail meter. As shown below, these hedge levels combined with
current market projections produce a cost of service to Dover estimated at $85.53 per MWh before any
incentive fee. The $85.53 is $1.48 per MWh above the 2008-09 projected cost of $84.05 in our last
report. This increase results from significant upward PJM price movements since the last report period
(ending April 19). The 10 day value-at-risk (inclusive of potential adverse market movements in
commodity and load following cost) could increase this target number to $89.72 per MWh.
Forward Hedge % Power Year 2008-09
Date: 05/09/2007 Peak 38%
Off Peak 19%
At Market At Market + Risk*
Energy Cost(including Load Following) $78.39 $82.58
Incentive Non-Energy Items
LSE Capacity $0.01 $0.01
Load Following
FRC Margin $0.00 $0.00
$0.01 $0.01
Pass-Through Items
Transmission $2.24 $2.24
Ancillary $2.00 $2.00
Losses $0.00 $0.00
$4.24 $4.24
Add Pace Fees $2.89 $2.89
Total Cost $85.53 $89.72
Add Incentive $0.00 $0.00
Current Expected $85.53 $89.72
* Includes estimate of 10-Day VaR & LF Risk
Proprietary & Confidential 21 Dover Monthly PGAM Report April 2007 - Final
Página 27
2008 – 2009 Month-by-Month Hedge Transactions
Off-Peak Power, Dover Zone 5/9/2007 On-Peak Power, Dover Zone 5/9/2007
Hedge Hedge
Total Fixed Total Fixed
Period Ratio Period Ratio
08-09 Volume Volume 08-09 Volume Volume
(MWh) (MWh) (MWh) (MWh)
Jul-08 41,040 5,880 14% Jul-08 44,682 14,080 32%
Aug-08 38,008 6,120 16% Aug-08 45,769 13,440 29%
Sep-08 32,600 5,760 18% Sep-08 38,039 13,440 35%
Oct-08 29,103 5,640 19% Oct-08 32,956 14,720 45%
Nov-08 28,405 6,240 22% Nov-08 29,784 12,160 41%
Dec-08 29,366 5,880 20% Dec-08 32,911 14,080 43%
Jan-09 32,116 6,120 19% Jan-09 33,286 13,440 40%
Feb-09 28,262 5,280 19% Feb-09 30,349 12,800 42%
Mar-09 27,490 5,880 21% Mar-09 33,493 14,080 42%
Apr-09 26,124 5,520 21% Apr-09 29,350 14,080 48%
May-09 30,003 6,360 21% May-09 32,505 12,800 39%
Jun-09 31,735 5,520 17% Jun-09 41,945 14,080 34%
Total 374,252 70,200 19% Total 425,069 163,200 38%
Proprietary & Confidential 22 Dover Monthly PGAM Report April 2007 - Final
Página 28
2009 - 2010 Power Year Hedge Position
For power year 2009-2010, the estimated power consumption was hedged 14 percent on peak and 19
percent off peak. Hedge volumes are based on the three year historical load profile at the Dover bus
prior to any distribution losses to the retail meter. As shown below, these hedge levels combined with
current market projections produce a cost of service to Dover estimated at $83.96 per MWh before any
incentive fee. The $83.96 is $2.37 per MWh above the 2009-2010 projected cost of $81.59 in our last
report. This increase results from significant upward PJM price movement since the last report period
(ending April 19). The 10 day value-at-risk (inclusive of potential adverse market movements in
commodity and load following cost) could increase this target number to $88.01 per MWh.
Forward Hedge % Power Year 2009-10
Date: 05/09/2007 Peak 14%
Off Peak 19%
At Market At Market + Risk*
Energy Cost(including Load Following) $76.74 $80.79
Incentive Non-Energy Items
LSE Capacity $0.01 $0.01
Load Following
FRC Margin $0.00 $0.00
$0.01 $0.01
Pass-Through Items
Transmission $2.24 $2.24
Ancillary $2.00 $2.00
Losses $0.00 $0.00
$4.24 $4.24
Add Pace Fees $2.97 $2.97
Total Cost $83.96 $88.01
Add Incentive $0.00 $0.00
Current Expected $83.96 $88.01
* Includes estimate of 10-Day VaR & LF Risk
Proprietary & Confidential 23 Dover Monthly PGAM Report April 2007 - Final
Página 29
2009 – 2010 Month-by-Month Hedge Transactions
Off-Peak Power, Dover Zone 5/9/2007 On-Peak Power, Dover Zone 5/9/2007
Hedge Hedge
Total Fixed Total Fixed
Period Ratio Period Ratio
09-10 Volume Volume 09-10 Volume Volume
(MWh) (MWh) (MWh) (MWh)
Jul-09 41,040 5,640 14% Jul-09 44,682 5,520 12%
Aug-09 38,008 6,120 16% Aug-09 45,769 5,040 11%
Sep-09 32,600 5,760 18% Sep-09 38,039 5,040 13%
Oct-09 29,103 5,880 20% Oct-09 32,956 5,280 16%
Nov-09 28,405 6,000 21% Nov-09 29,784 4,800 16%
Dec-09 29,366 5,880 20% Dec-09 32,911 5,280 16%
Jan-10 32,116 6,360 20% Jan-10 33,286 4,800 14%
Feb-10 28,262 5,280 19% Feb-10 30,349 4,800 16%
Mar-10 27,490 5,640 21% Mar-10 33,493 5,520 16%
Apr-10 26,124 5,520 21% Apr-10 29,350 5,280 18%
May-10 30,003 6,360 21% May-10 32,505 4,800 15%
Jun-10 31,735 5,520 17% Jun-10 41,945 5,280 13%
Total 374,252 69,960 19% Total 425,069 61,440 14%
Proprietary & Confidential 24 Dover Monthly PGAM Report April 2007 - Final
Página 30
Credit and Counterparty Position
In order to manage its risk profile, Pace Global continues to monitor the ‘in the money’ or ‘out of the
money’ positions with each of the counterparties with which Dover has conducted transactions. Below
are summaries of the counterparties trading with Dover, their corresponding credit position, term, volumes
and pricing.
Proprietary & Confidential 25 Dover Monthly PGAM Report April 2007 - Final
Página 31
APPENDIX 1
POWER PURCHASES – HEDGE TRANSACTION DETAILS
Power Year 2006/07
Hedged
ID Counterparty Timeblock Quality Trade Date Buy/Sell Start Date End Date Volume Allocation Price
2 BP Energy On Peak 5x16 Firm 6/22/2006 Buy 7/1/2006 6/30/2007 25 MW per hour $90.25
7 BP Energy Off Peak 5x8+2x24 Firm 6/22/2006 Buy 7/1/2006 6/30/2007 25 MW per hour $57.70
1 Connectiv On Peak 5x16 Firm 6/22/2006 Buy 7/1/2006 9/30/2006 25 MW per hour $95.00
6 Connectiv Off Peak 5x8+2x24 Firm 6/22/2006 Buy 7/1/2006 9/30/2006 25 MW per hour $56.00
3 Constellation On Peak 5x16 Firm 6/27/2006 Buy 7/1/2006 6/30/2007 50 MW per hour $88.50
4 Constellation On Peak 5x16 Firm 6/27/2006 Buy 7/1/2006 8/31/2006 30 MW per hour $90.50
8 Constellation Off Peak 5x8+2x24 Firm 6/27/2006 Buy 7/1/2006 6/30/2007 25 MW per hour $57.75
9 Constellation Off Peak 5x8+2x24 Firm 6/27/2006 Buy 7/1/2006 8/31/2006 25 MW per hour $56.65
5 WPS On Peak 5x16 Firm 7/12/2006 Buy 10/1/2006 6/30/2007 20 MW per hour $84.71
10 WPS Off Peak 5x8+2x24 Firm 7/12/2006 Buy 10/1/2006 6/30/2007 25 MW per hour $56.65
Power Year 2007/08
Hedged
ID Counterparty Timeblock Quality Trade Date Buy/Sell Start Date End Date Volume Allocation Price
16 Conectiv On Peak 5x16 Firm 10/18/2006 Buy 7/1/2007 8/31/2007 20 MW per hour $112.75
17 Conectiv Off Peak 5x8+2x24 Firm 10/18/2006 Buy 7/1/2007 8/31/2007 15 MW per hour $63.25
18 Conectiv On Peak 5x16 Firm 10/19/2006 Buy 1/1/2008 2/29/2008 40 MW per hour $100.50
19 Conectiv Off Peak 5x8+2x24 Firm 10/19/2006 Buy 1/1/2008 2/29/2008 30 MW per hour $65.25
11 Sempra Energy Trading On Peak 5x16 Firm 10/13/2006 Buy 7/1/2007 9/30/2007 35 MW per hour $72.65
12 Sempra Energy Trading On Peak 5x16 Firm 10/13/2006 Buy 10/1/2007 11/30/2007 20 MW per hour $72.65
13 Sempra Energy Trading Off Peak 5x8+2x24 Firm 10/13/2006 Buy 7/1/2007 11/30/2007 25 MW per hour $72.65
14 Sempra Energy Trading On Peak 5x16 Firm 10/16/2006 Buy 7/1/2007 6/30/2008 30 MW per hour $75.65
15 Sempra Energy Trading Off Peak 5x8+2x24 Firm 10/16/2006 Buy 7/1/2007 6/30/2008 20 MW per hour $75.65
20 Sempra Energy Trading Off Peak 5x8+2x24 Firm 10/20/2006 Buy 9/1/2007 9/30/2007 10 MW per hour $46.15
21 Sempra Energy Trading On Peak 5x16 Firm 10/20/2006 Buy 12/1/2007 12/31/2007 20 MW per hour $69.95
22 Sempra Energy Trading Off Peak 5x8+2x24 Firm 10/20/2006 Buy 12/1/2007 12/31/2007 25 MW per hour $69.95
23 Sempra Energy Trading On Peak 5x16 Firm 10/20/2006 Buy 3/1/2008 3/31/2008 10 MW per hour $70.10
24 Sempra Energy Trading Off Peak 5x8+2x24 Firm 10/20/2006 Buy 3/1/2008 3/31/2008 20 MW per hour $70.10
25 Sempra Energy Trading On Peak 5x16 Firm 10/20/2006 Buy 4/1/2008 4/30/2008 10 MW per hour $58.35
26 Sempra Energy Trading Off Peak 5x8+2x24 Firm 10/20/2006 Buy 4/1/2008 4/30/2008 20 MW per hour $58.35
Proprietary & Confidential 26 Dover Monthly PGAM Report April 2007 - Final
Página 32
Power Year 2007/08
Hedged
ID Counterparty Timeblock Quality Trade Date Buy/Sell Start Date End Date Volume Allocation Price
34 Sempra Energy Trading On Peak 5x16 Firm 10/31/2006 Buy 7/1/2007 12/31/2007 10 MW per hour $85.40
47 Sempra Energy Trading On Peak 5x16 Firm 12/27/2007 Buy 3/1/2008 4/30/2008 25 MW per hour $76.35
48 Sempra Energy Trading On Peak 5x16 Firm 12/27/2007 Buy 5/1/2008 5/31/2008 50 MW per hour $71.35
49 Sempra Energy Trading On Peak 5x16 Firm 12/27/2006 Buy 6/1/2008 6/30/2008 75 MW per hour $85.75
50 Sempra Energy Trading Off Peak 5x8+2x24 Firm 12/27/2006 Buy 5/1/2008 6/30/2008 25 MW per hour $44.50
51 Sempra Energy Trading Off Peak 5x8+2x24 Firm 12/27/2006 Buy 7/1/2007 6/30/2008 5 MW per hour $66.30
52 Sempra Energy Trading On Peak 5x16 Firm 12/27/2006 Buy 7/1/2007 6/30/2008 5 MW per hour $66.30
27 WPS On Peak 5x16 Firm 10/25/2006 Buy 12/1/2007 12/31/2007 20 MW per hour $85.50
28 WPS On Peak 5x16 Firm 10/25/2006 Buy 1/1/2008 2/29/2008 10 MW per hour $101.00
29 WPS On Peak 5x16 Firm 10/26/2006 Buy 7/1/2007 8/31/2007 20 MW per hour $112.00
30 WPS On Peak 5x16 Firm 10/26/2006 Buy 9/1/2007 9/30/2007 30 MW per hour $77.00
32 WPS On Peak 5x16 Firm 10/27/2006 Buy 10/1/2007 11/30/2007 20 MW per hour $75.00
33 WPS Off Peak 5x8+2x24 Firm 10/27/2006 Buy 7/1/2007 6/30/2008 10 MW per hour $53.30
Power Year 2008/09
Hedged
ID Counterparty Timeblock Quality Trade Date Buy/Sell Start Date End Date Volume Allocation Price
53 Sempra Energy Trading On Peak 5x16 Firm 1/4/2007 Buy 7/1/2008 6/30/2009 15 MW per hour $69.05
54 Sempra Energy Trading Off Peak 5x8+2x24 Firm 1/4/2007 Buy 7/1/2008 6/30/2009 15 MW per hour $69.05
57 WPS On Peak 5x16 Firm 4/24/2007 Buy 7/1/2008 12/31/2008 25 MW per hour $94.32
Power Year 2009/10
Hedged
ID Counterparty Timeblock Quality Trade Date Buy/Sell Start Date End Date Volume Allocation Price
55 Sempra Energy Trading On Peak 5x16 Firm 1/4/2007 Buy 7/1/2009 6/30/2010 15 MW per hour $68.35
56 Sempra Energy Trading Off Peak 5x8+2x24 Firm 1/4/2007 Buy 7/1/2009 6/30/2010 15 MW per hour $68.35
Proprietary & Confidential 27 Dover Monthly PGAM Report April 2007 - Final
Página 33
APPENDIX 2
PJM INVOICE BREAKDOWN
The PJM bill is a record of all Electricity Transactions, Transmission Services, Ancillary Services and
Miscellaneous fees that allow the PJM to operate. Below is a list of the line items on the PJM bill
including all generator activity.
PJM Line Item Load Gen Net
Balancing Energy (86,824.77) 5,300.85 (81,523.92)
Day Ahead Energy 348,221.73 0.00 348,221.73
Regulation Charges (33,155.17) 0.00 (33,155.17)
Synchronized Reserve Charges (18,281.55) 0.00 (18,281.55)
Balancing Operating Reserves Charges (3,591.63) 0.00 (3,591.63)
Day Ahead Operating Reserves Charges (4,949.16) 0.00 (4,949.16)
Balancing Operating Reserves Credits 0.00 6,522.07 6,522.07
Synchronous Condensing Charges (1,237.69) 0.00 (1,237.69)
Real-time Economic Load Response Program Charges (4,200.75) 0.00 (4,200.75)
Black Start Service Credits 0.00 4,977.77 4,977.77
North American Electric Reliability Corporation (NERC) Charge (258.30) 0.00 (258.30)
Reliability First Corporation (RFC) Charges (561.52) 0.00 (561.52)
Reactive Supply and Voltage Control from Generation Sources
Service Charges (22,299.07) 0.00 (22,299.07)
PJM Scheduling System Control and Dispatch Service Charges (15,860.25) 0.00 (15,860.25)
Transmission Owner Scheduling System Control and Dispatch Service
Charges (4,172.09) 0.00 (4,172.09)
Black Start Service Charges (1,119.61) 0.00 (1,119.61)
Network Integration Transmission Service Charges (140,943.30) 0.00 (140,943.30)
Expansion Cost Recovery Charges (415.29) 0.00 (415.29)
Non-Firm Point-to-Point Transmission Service Credits 1,066.61 0.00 1,066.61
Auction Revenue Rights Credits 67,662.90 0.00 67,662.90
Transmission Losses (Point-to-Point) Credits 3,674.61 0.00 3,674.61
PPA's (5,385.72) 0.00 (5,385.72)
77,369.98 16,800.69 94,170.67
Due to the Settlement of Transmission Rate Case ER05-515: Pepco/ Dpl the City is entitled to an
estimated refund of $512,640 to be spread over 12 months beginning in June -06. The credit comes
through on the PJM bill as a reduction in the rate charged by DPL for Network transmission service.
DPL Total Refund ($12,021,624)
DPL System Peak Load 4,174 mw
Per Mw Refund ($2880.12)
Dover Peak Load 174.25 mw
Dover Estimated Refund ($501,860.91)
Proprietary & Confidential 28 Dover Monthly PGAM Report April 2007 - Final
Página 34
APPENDIX 3
NORTH AMERICAN ENERGY SERVICES - APRIL 2007 MONTHLY REPORT
Proprietary & Confidential 29 Dover Monthly PGAM Report April 2007 - Final
Página 35
North American Energy Services
Dover, DE
April 2007
Monthly Report
Two Years Accident Free
April 5, 2007
1 of 16
Página 36
Table of Contents
1.0 Executive Summary
2.0 Environmental Health and Safety
3.0 Financial
4.0 Operations
5.0 Maintenance
6.0 Engineering
7.0 Summary of NAES Performance
2 of 16
Página 37
1.0 Executive Summary
Calendar of Events Date
Two Year Accident Free Target April 5, 2007
RCRA & DOT Training April 10, 2007
GPiLearn Training April 11 – 12, 2007
Unit 11 Annual Outage April 16 – 29, 2007
Toxic Release Inventory (TRI) Due June 1, 2007
McKee Run – Delaware Regulation 1146 July 1, 2007
Compliance Plan Due to DNREC
Unit 1 Annual Outage October 8 - 15, 2007
Unit 2 Annual Outage October 15 - 22, 2007
McKee Run Fuel Oil Tank #1 Out-of-Service June 1, 2008
Inspection Due Date
Three Year Accident Free Target April 5, 2008
Environmental, Health, and Safety
Month Fiscal Year to Date
(April 2007) 7/1/06-6/30/07
NOVs 0 0
Opacity Deviations 0 36
Environmental Deviations 0 0
OSHA Recordable 0 0
OSHA LTA's 0 0
Operations
Month Fiscal Year to Date
(April 2007) 7/1/06-6/30/07
Net Station Output (MWH) – Note 1 85.048 26,770.153
Period Hours 2880 29,184
On line Hours 2.7 930.232
Planned Outage Hours 102.334 382.068
Maintenance Outage Hours 0 54.667
Forced Outage Hours 0 108.575
Reserve Shutdown Hours 2,774.966 27,708.238
Equivalent Forced Outage Hours 0 214.57
Station Availability - Note 2 96.45% 98.13%
Note 1 – Net Station Output does not include station auxiliaries when units are off line.
Note 2 – Availability is calculated using service hours + reserve shutdown hrs divided by hours in period.
3 of 16
Página 38
Gross Generation vs. Forecast
(Revised 12/1/2006)
16000
Total Gross Generation (MWh)
14000
12000
10000
8000
6000
4000
2000
0
July Aug Sep Oct Nov Dec Jan Feb Mar Apr May June
Month
Actual Gross Generation (MWh) Gross Generation Forecast (MWh)
4 of 16
Página 39
2.0 Environmental, Health and Safety
During the month of April, there were no employee or contractor related injuries or illnesses. As a
follow up to the emergency evacuation drill held at the McKee Run facility during the month of
March, we have purchased status boards for employees and visitors to help us identify all individuals
on site at all times. The boards have magnetic buttons to indicate whether or not employees are IN or
OUT of the building. All employees should be trained in the use of the new attendance system and
the boards should be in full use by May 12, 2007.
The Employee-Plant Safety Committee conducted a lunch time cook out to commemorate two years
of accident-free operation. Dover Mayor Steven Speed, Dover City Manager Tony DePrima and
representatives of Pace Global, Fred James and Keith Mills were among the honored guests in
attendance to acknowledge the two-year milestone.
The plant was notified by the DNREC Tank Management Branch that they had approved an alternate
procedure for monitoring the McKee Run Fuel Oil Tank #1 and Oil Inventory until an Out-of-Service
Tank inspection can be completed. The inspection must be completed no later than June 1, 2008.
The DNREC Tank Management Branch has requested monthly data collection and submission of the
data to the department until the inspection has been completed. The plant will compile this
information and send to DNREC at the end of each month in order to honor their request
Quarterly EDR’s (Electronic Data Reports) were filed for McKee Run Unit 3 and VanSant Unit 11.
The audit feedback from the EPA and the Clean Air Market Division MDC check (Monitoring Plan
Data Checking Software) stated that no errors were found.
There were no Notice of Violations, Environmental excursions or Near Miss reports during the month
of April.
Safety Statistics
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun FYTD
Hours
5,389.5 5,697.75 5129.5 5,454 5,101.5 5,089.5 5,506 4,705 5,605 5,100 52,777.75
Worked
First Aid
0 0 0 0 0 0 0 0 0 0 0
cases
OSHA
0 0 0 0 0 0 0 0 0 0 0
Recordable
Lost Time 0 0 0 0 0 0 0 0 0 0 0
Accidents
Restricted
Workday 0 0 0 0 0 0 0 0 0 0 0
Accident
Near Miss 0 1 0 0 0 0 0 0 2 0 3
Date last OSHA Recordable 4/05/05
Date last Lost Time Accident 4/05/05
Days since last OSHA recordable 755
Days since last Lost Time Accident 755
5 of 16
Página 40
Emissions (NOx & SO2) All data thru 4/30/07
NOx Summary - Year (May-Sept.)Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2002 17.34 14.38 175.76 6.01 213.49
2003 9.34 7.84 127.36 2.45 146.99
2004 3.38 2.74 98.76 7.55 112.43
2005 20.16 20.64 103.3 2.19 146.29
2006 1.82 1.78 19.25 1.72 24.57
2007 0 0 0 0 0
NOx Allowances Summary
NOx NOx NOx Allowances Available Total NOx NOx
Allowance Allowances (Per Facility, Prior to Sale) Tons Emitted Allowance
Vintage Sold YTD McKee Run VanSant (NOx Season) Balance
2007 0 191 7 0 198
2008 0 191 7 0 198
2009 0 191 7 0 198
Note: NOx Season is May 1 to September 30.
SO2 Summary - Year (Jan.-Dec.)Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2002 23.43 24.93 696.91 6.38 751.65
2003 22.77 18.89 490.14 2.35 534.15
2004 10.96 9.64 489.44 1.45 490.89
2005 49.91 52.08 530.24 2.30 634.69
2006 3.69 1.51 50.7 0.40 56.30
2007 0 0 10.48 0.16 10.64
SO2 Allowances Summary
SO2 Allowances
SO2 Available Total SO2 SO2
Allowances (Per Unit, Prior to Tons Allowances
SO2 Allowance
Sold - YTD Sale & Emitted – Balance
Vintage
Reconciliation) U3 and U11
Unit #3 Unit #11 YTD
2006 2673 2586 139 52 0
2007 327 2585 138 11 2385
2008 0 2585 138 0 2723
2009 0 2585 138 0 2723
6 of 16
Página 41
2.1 Training
Final arrangements have been made with General Physics, to utilize their web-based training
programs for the Dover facility. The training courses would include topics that satisfy OSHA
compliance and provide general knowledge to site personnel related to power plant operations,
mechanical, electrical, instrumentation & control maintenance, water treatment, heat rate and plant
performance. Three Dover employees, Philip Kosek, EHS and Admin Manager, Ray Lavender,
Operations Supervisor and Paul Greenage, Maintenance Supervisor, attended orientation training at
the General Physics training Center on April 11 & 12, 2007. Program implementation will begin
during the month of May for all NAES employees.
7 of 16
Página 42
3.0 Financial
Financial – Current Month
Month – April 2007
Actual Budget Variance
Personnel 223,573 245,115 21,542
Administrative 32,190 98,019 65,829
EH & S 894 2,500 1,606
Maintenance Expense 41,988 60,550 18,562
Operations Expense 13,470 36,922 23,452
Total $312,115 $443,106 $130,991
Financial – Fiscal Year to Date
Number of Months - 10
Actual Budget Variance
Personnel 2,408,334 2,683,269 274,935
Administrative 760,845 864,674 103,829
EH & S 69,702 68,000 (1,702)
Maintenance Expense 388,768 556,000 167,232
Operations Expense 143,286 515,285 371,999
Total $3,770,935 $4,687,228 $916,293
3.1 Variance analysis
For the month of April, we had a favorable variance of $130,991. The variance was due to the
following:
PERSONNEL EXPENSES – Favorable variance of $21,542 due to lower overtime and burdens due
to low run time that accounted for the majority of the total variance.
ADMINISTRATIVE EXPENSES - Favorable variance of $65,829 which was partially due to
insurance premiums budgeted on a monthly basis were paid in a lump sum payment in August. Also,
money budgeted in April for the fuel oil tank inspection (50K) was actually spent in January.
ENVIRONMENTAL, HEALTH, AND SAFETY EXPENSES - Favorable variance of $1,606 due to
a zero non-hazardous waste disposal expense and no water sampling invoices.
MAINTENANCE EXPENSES- Favorable variance of $18,562 due to the City of Dover crediting a
few of the major accounts for items that were previously charged out to these accounts but were
actually inventory purchases. Our expenses for some of the other maintenance accounts was a lot
lower due to minimal run time.
OPERATING EXPENSES – Favorable variance of $23,452 due primarily to not being billed for
McKee Run auxiliary electric usage and for low water usage (limited operational run time). This has
been corrected with the City Electric Department and we should expect to McKee Run electric bills
in future months.
8 of 16
Página 43
4.0 Operations
Month – April 2007
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 0 0 0 0 2.7 2.7
Starts # 0 0 0 0 2 2
Gross Generation MWh 0 0 0 0 85.477 85.477
Net Generation MWh 0 0 0 0 85.048 85.048
Total Auxiliaries MWh 31.528 31.528 148.186 211.242 30.896 242.138
Auxiliaries purchased MWh 31.528 31.528 148.186 211.242 30.467 241.709
Fuel Gas Used MMBTU 0 0 0 0 1258.04 1258.04
Fuel Oil Used MMBTU 0 0 0 0 0 0
Fuel Oil Used Gallons 0 0 0 0 0 0
Total Fuel MMBTU 0 0 0 0 1258.04 1258.04
Net Heat Rate BTU/KWh NA NA NA NA 14792 14792
Unit Trips # 0 0 0 0 0 0
Capacity Factor % 0.0% 0.0% 0.0% 0.0% 0.30% 0.07%
Availability Factor % 100% 100% 100% 100% 85.79% 96.45%
eFOR % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
HW Boiler Gas Usage MMBTU 1,738.00 1,738.00
Pilot Gas Usage MMBTU 0 0 0 0
# Note: Does not include HWB or Pilot Gas
Fiscal Year to Date 7/1/06-6/30/07
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 184.134 190.018 441.026 815.178 115.054 930.232
Starts # 6 5 23 34 37 71
Gross Generation MWh 1,499.154 1,580.808 22,198.381 25,278,343 3,643.055 28,921.398
Net Generation MWh 1,406.823 1,482.405 20,259.787 23,149.015 3,621.138 26,770.153
Total Auxiliaries MWh 420.312 426.384 3,992.299 4,838.995 318.787 5,202.369
Auxiliaries purchased MWh 327.981 327.981 2,053.705 2,709.667 296.870 3,051.124
Fuel Gas Used MMBTU 13,478.64 17,386.555 153,605.208 184,470.403# 43,362.033 227,832.437#
Fuel Oil Used MMBTU 8,547.961 3,177.772 88,658.168 100,383.902 5,246.186 105,630.089
Fuel Oil Used Gallons 57,177 21,256 590,982 669,415 37,933 707,348
Total Fuel MMBTU 22,026.601 20,564.327 242,263.377 284,854.306# 48,608.22 333,462.526#
Net Heat Rate BTU/KWh 15,657 13,872 11,958 12,305 13,423 12,457
Unit Trips # 4 1 1 6 9 15
Capacity Factor % 1.13% 1.20% 2.72% 2.33% 1.27% 2.10%
Availability Factor % 97.96% 98.60% 98.12% 98.23% 97.85% 98.13%
eFOR % 0.96% 3.00% 0.47% 0.85% 0.0% 0.66%
HW Boiler Gas Usage MMBTU 18,058.224 18,058.224
Pilot Gas Usage MMBTU 526,200 822,562 1,348.762 1,348.762
# Note: Does not include HWB or Pilot Gas. Fuel usage numbers are taken from fuel flow instruments
9 of 16
Página 44
VanSant Lifetime through 4/30/07
Actual Starts Factored Starts Fired Hours
VanSant 1153 1888.25 3,743.902
Since HGP - Dec 2004 105 220.55 348.999
Fuel Oil Inventory
Monthly Monthly Fuel Monthly FY 06-07 Fuel FY 06-07
Inventory Inventory Purchases Inventory Inventory Purchases Inventory
(Start) (End) (Month) (Change) (Start) (YTD) (Change)
McKee Run
1,207,208 1,205,783 0 (1,425) 1,870,932 0 (665,149)
(#6 Fuel Oil)
VanSant
116,848 117,311 0 463 155,782 0 (38,471)
(#2 Fuel Oil)
Note: As measured by tank level instruments. Tank levels may change due to oil temperature.
CapacityTesting
Summer 2006-2007 (June 1- Aug 31) Winter 2006-2007 (Dec 1- Mar 1)
Unit Rated Net Reported Net Unit Rated Net Reported Net
Capability (MW) Capability (MW) Capability (MW) Capability (MW)
1 17 17 1 17 17.3
2 17 17.4 2 17 17.45
3 102 102.68 3 102 105.18
VanSant 39 40.3 11 40 40.23
Total 175 177.38 Total 176 180.16
Unit 11 completed capacity test during the month of February 2007. Units 1, 2 & 3 completed capacity testing in
December 2006.
Historical Performance
Month Generation* Gas* Oil* Availability Capacity Factor Starts
(MWh) (MMBTU) (gal) 2006 2005 2006 2005 2006 2005
Jul 6,102.198 74,878.054 11,238 97.12 100 4.69 18.2 27 21
Aug 8,144.843 88,586.392 73,580 99.23 100 6.26 18.6 19 27
Sep 0 0 0 93.86 99.93 0 2.29 0 4
Oct 720.739 7,869.890 8,549 100 96.34 .55 0.33 3 2
Nov 4,068.753 44,645.125 44,671 98.10 100 3.21 0.19 9 2
Dec 5,917.68 5,649.197 453,077 100 100 4.52 17.69 4 9
2007 2006 2007 2006 2007 2006
Jan 285.314 4,156.404 0 100 100 0.22 0 1 1
Feb 569.496 584.278 58,515 100 98.87 0.63 0 3 6
Mar 697.498 205.052 57,718 96.54 90.99 0.53 .21 3 2
Apr 85.048 1,258.04 0 96.45 96.53 0.07 .01 2 6
May 100 .09 1
Jun 100 1.07 2
FYTD 24,954.323 227,832.437 707,348 98.13 98.55 2.10 4.99 71 83
* Note: Total Net Generation for all four units combined
10 of 16
Página 45
4.1 Training
During the month of April, Ray Lavender, Jeff Luff and Larry Sheranko, Operations Supervisors,
attended an Ashland RCRA/DOT training course to provide additional knowledge in helping to keep
our hazardous waste program up-to-date on current regulations and best practices. Operations
Personnel continue with monthly online PJM training in order to meet PJM training requirements and
for further exam preparation. Work is in the final stages of development of an Operational Readiness
Plan which will provide a more structured training and skill set refresher regimen to all Operations
and Maintenance Personnel. GPiLearning courses which we have recently brought on board will be
utilized as part of this training program.
4.2 Personnel
We continue to have an opening in the operations department due to an employee leaving the
company in October 2006 to pursue other career opportunities. At the present time, plant
management has decided to leave the position open and continues to actively adjust the operations
teams’ work schedules to meet plant needs.
11 of 16
Página 46
5.0 Maintenance
During the month of April, the plant maintenance staff continued addressing our backlog of work
orders, completed the annual outage inspections on Unit 11 and focused on keeping all units available
to our client and PJM. Fifty-nine work orders were issued during the month, and fifty-eight work
orders were completed during the month.
The table below summarizes the monthly work order activities.
Work Order Report
April - 07
Outstanding
From Outstanding
Previous Issued This Completed at the end of
Priority # Months Month This Month the month
P1 0 2 2 0
P2 0 5 5 0
P3 1 9 9 1
P4 6 32 26 12
P5 7 2 5 0
P6 0 0 0 0
P7 5 2 2 5
P8 7 4 4 7
P9 2 2 0 4
P6 - 1 0 0 0 0
P6 - 2 0 0 0 0
P6 - 3 0 0 0 0
P6 – 4 3 1 4 0
P6 – 5 0 0 0 0
P6 – 6 0 0 0 0
P6 – 7 1 0 0 1
P6 - 8 0 0 0 0
PM 13 30 31 12
Totals 29 59 58 30
Note: PM's are included in the priority totals
Notable activities during the month include:
1) We completed the annual outage on Unit 11 on time and ahead of the anticipated scheduled.
Prior to the outage, an off line water wash was performed on the compressor at VanSant.
During the outage, we received our annual borescope inspection from Advanced Turbine
Support, Inc., with no red flags showing up.
2) During the outage at VanSant, we received our annual oil flow meter and transmitter
calibration / certification and also removed, inspected and documented the condition of the
main gas line orifice plate to comply with our Title V Operating Permit.
3) During the month, maintenance team members completed taking oil samples for our oil
analysis program.
12 of 16
Página 47
The following work orders remained open at the end of the month:
Work Due Date Brief Description of Work Order Reason for Past Due
Order #
5711 6/20/05 New control room CEMS view Computer has been dedicated as a replacement. OEM
node and computer vendor cannot assist with configuration. Plant looking into
alternative method of interface with main CEMS
computer.
6614 3/15/07 Revise plant safety video Video is 90% complete.
6655 11/17/06 Steps for 001 Outfall Plan has been developed and are awaiting vendor visits
and quotes
6731 12/14/06 Leaking regulator on B acid pump Waiting on parts, on order
at VanSant
6999 4/20/07 Plant electric utility vehicle will Waiting on parts, on order
not hold a charge
5.1 Training
1) During the month, Eric Carrow received training on the monthly PM of our sulfur determinator
from Ray Wheatley.
2) Members of the flex team continued to receive training on gauge and instrument calibrations from
the Plant Instrument Technicians, Rich Newman and Dave Pletsch.
3) By working with our maintenance staff during the month, flex team members continue to become
more familiar with their duties and responsibilities. This cross training will be a benefit to the entire
team, as it adds more flexibility to our skill sets.
13 of 16
Página 48
6.0 Engineering
Unit Trips/Outages/Operations
During the month, Unit 11 was operated for 2.7 hours on April 28 on dispatch by PJM. In addition, a
compressor off-line water-wash was performed on the unit early in the month and just prior to its’
annual maintenance outage.
In April, the Unit 11 Annual Outage was completed during which a borescope inspection was
performed on the compressor. Preliminary feedback from the inspector as to the condition of the unit
was very positive. Final results and an assessment of the unit is expected in early May. Other outage
work included the calibration of instrument transmitters and gauges, inspection of the stack,
inspection of electrical bus work, GE TIL work and preventative maintenance on all rotating
electrical and mechanical equipment.
Other Events
We had several members of our staff attend a two day training session at the General Physics facility
to gain the knowledge to set up the plant on the GPILearn on-line training system. Since their return
to the plant, a course schedule has been set up and staff members will begin begun taking the on-line
instruction courses in early May, 2007. The General Physics website based training will be utilized in
several plant programs including the Operational Readiness Plan and the Employee Development and
Qualification Program (EDQP) as well as meeting annual OSHA training requirements.
After months of discussion and providing information to the DNREC Tank Management Branch,
they have approved an alternate procedure to be followed until an Out-of-Service Inspection can be
completed on the McKee Run Fuel Oil Tank #1. Under the alternate procedure, the plant will need to
supply DNREC with visual inspection documentation and oil tank inventory information on a
monthly basis until the Out-of-Service Inspection is completed. We have been mandated by DNREC
to have this inspection completed no later than June 1, 2008.
A meeting with the DNREC Air Quality Management Branch was held to discuss the Delaware
Regulation 1146 Compliance Plan presented by the City of Dover for Unit 3 in March. DNREC had
evaluated the options and this meeting was an opportunity to discuss their evaluation with the City of
Dover representatives. Based on these discussions, a compliance plan continues to be developed
further by the City of Dover with input from NAES and Pace Global personnel.
In our efforts to continuously improve, we continue to investigate installation of Automatic
Generation Control (AGC) on Unit 3 and on Unit 11. This improvement, if achievable, would
provide an even greater value to these units during periods of operation. Also included in the
improvement effort, we have been actively been working with Pace Global to develop competitive
bidding strategies in the PJM market that could provide more operating opportunities for all our units,
thereby increasing electric generation revenue. Some of these strategies have been implemented
since our initial discussions and we expect to see positive results from these in the near future.
14 of 16
Página 49
The final version of the XL Insurance Report was provided to the plant in April with several
recommendations. Some of these findings have already been addressed and other findings are being
researched to determine best methodology of completing the tasks. The insurance inspectors were
very impressed with the condition of the plant and have provided additional information and
recommendations in the timing of major inspections on the McKee Run steam turbines.
The Employee-led Plant Safety Committee and the Maintenance Staff were recipients of a fantastic
breakfast prepared by Phil Marvel, Plant Electrician and Dean Blaha, Plant Manager. The breakfast
was offered up in the Plant’s 2006 United Way Silent Auction by Phil (2006 Plant United Way
Chairman) and Dean as a way to raise funds for the Plant’s United Way Campaign. The breakfasts
were purchased by Paul Greenage, Maintenance Supervisor and Ken Beard, O & M Manager who
then invited the teams to be their guests for the feast. Plant staff continues to support the United Way
and its’ mission and is currently planning for the coming campaign year.
Leading Edge Turbine Technologies (LETT) has received the fuel nozzles for inspection, flow testing
and repairs. The repairs should take four to eight weeks and once the nozzles are returned, they will
be placed into the plant inventory as a spare set. We have asked for an analysis from LETT to help
us determine the exact cause of the damage to the fuel nozzles. We have yet to receive this analysis.
15 of 16
Página 50
7.0 Summary of NAES Performance to Date
Measure Month Year to Date YTD Incentive
eFOR 0.0% 0.66% $66,800
Budget (Actual vs. Budget) 70.44% 80.45% $20,000
Safety 0 0 $15,000
Environmental 0 0 $15,000
Capacity Tests Completed Summer Winter Summer Winter
Unit 1 No No Yes Yes $1,000
Unit 2 No No Yes Yes $1,000
Unit 3 No No Yes Yes $6,000
Unit 11 No No Yes Yes $2,000
Total YTD Incentive $126,800