Página 1
REGULAR COUNCIL MEETING
AGENDA
July 11, 2005 - 7:30 P.M. - Council Chambers - City Hall - City of Dover
OPEN FORUM - 15 MINUTES PRIOR TO OFFICIAL MEETING (7:15 P.M.)
INVOCATION BY CHAPLAIN WALLACE DIXON
PLEDGE OF ALLEGIANCE
AGENDA ADDITIONS/DELETIONS
* CONSENT AGENDA
Those items on the Council Agenda which are considered routine and non-controversial shall be marked
with an asterisk (*) and will be acted upon by a single roll call vote of the Council. There will be no
separate discussion of these items unless a member of Council so requests, in which event the matter shall
be removed from the Consent Agenda and considered a separate item.
* 1. Adoption of Minutes - Regular Council Meeting of June 27, 2005
2. Presentations - Recognition of Services
A. Francis Winsley - Planning Commission (June 2001 through June 2005)
B. Carol Young - Planning Commission (May 2004 through May 2005)
C. David Anderson - Parks, Recreation and Community Enhancement Committee (May 2004
through May 2005)
3. Lutheran Senior Services of Dover, Inc. - Contribution in Lieu of Taxes
4. Public Hearing/Final Reading - Rezoning
Property located at 834 W. North Street, owned by Eden Hill Farm, Inc. and the State of
Delaware (equitable owners: Investment Properties Associates, L.L.C. and Dover Medical Properties,
L.L.C.). The property is currently zoned IPM (Industrial Park Manufacturing) and A (Agriculture)
and the proposed zoning is TND (Traditional Neighborhood Design) The First Reading of the
proposed ordinance was accomplished during the Council Meeting of May 23, 2005.
* 5. Utility Committee Report - June 27, 2005
A. Street Waiver Request (Length of Cul-de-Sac Street) - Somerset Park Subdivision
B. Annexation Requests
b-1. Property Located on the Northwest Corner of Kenton Road and Fox Hall Drive,
owned by Clifton and Marie Hutton (Adoption of Resolution Setting Annexation
Referendum for August 11, 2005 - See Item #9A)
b-2. Property Located at 80 Nixon Lane, owned by Traci A. McDowell and
Craig L. Gahm (Adoption of Resolution Setting Annexation Referendum for
August 11, 2005 - See Item #9B)
C. Staff Report - Alternative Fuels
Página 2
Council Agenda
July 11, 2005 Page 2
* 6. Safety Advisory and Transportation Committee Report - June 28, 2005
A. Consideration of Proposed Ordinance Amendment - Chapter 13, Motor Vehicles and
Traffic - Section 13-30.2, Vehicle Parking Limited Where Carrying Capacity is in Excess
of One Ton, and Trailer and Motor Home Parking (See Item #10-A)
7. Evaluation of Bid - Electric Pole Testing Contract
* 8. Appointment of Planning Commission 4th District Representative - Charles Benton (To Fill
Unexpired Term of Carol Young - Term to Expire June 2007) - Mayor Speed
9. Annexation Rezoning Requests - First Readings (Recommended for referral to the Planning
Commission on July 18, 2005 and that a Public Hearing be set for August 22, 2005 at 7:30 p.m.)
A. Properties located on the northwest corner of Kenton Road and Fox Hall Drive and on the
south side of Fox Hall Drive adjacent to Kenton Road, owned by Clifton and Marie Hutton.
The present zoning classification is RS-1 - Single Family Residential (Kent County) and the
proposed zoning classification is RG-3 - Group Housing (City of Dover)
B. Property located at 80 Nixon Lane, owned by Traci A. McDowell and Craig L. Gahm. The
present zoning classification is RS-1 - Single Family Residential (Kent County) and the
proposed zoning classification is R-8 - One Family Residential (City of Dover)
10. First Reading - Proposed Ordinance
The First Reading is offered on the following proposed ordinance. Final action by Council will
take place during the Second Reading of the ordinance on July 25, 2005. Copies of all proposed
ordinances are available at the entrance of the Council Chambers or can be obtained from the
City Clerk's Office.
A. Chapter 13 - Motor Vehicles and Traffic, Division I - Generally, Sec. 13-30.2. Vehicle Parking
Limited Where Carrying Capacity is in Excess of One Ton, and Trailer and Motor Home Parking
(Safety Advisory and Transportation Committee)
11. Council Members Comments
/jg
S:\ClerksOffice\Agendas&Minutes\Council-Agendas\2005\07-11-2005.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE
TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Página 3
REGULAR COUNCIL MEETING
The Regular Council Meeting was held on June 27, 2005 at 7:30 p.m. with Council President
Williams presiding. Council members present were Mr. Carey, Mr. Pitts, Mr. Sadusky, Mr. Slavin,
Mr. Ritter, Mr. Hogan, and Mr. Salters. Mr. Ruane was absent.
Council staff members present were Police Chief Horvath, Ms. Russell, Mrs. Mitchell, Mr. Galvin,
Fire Chief Bashista, Mr. DePrima, City Solicitor Rodriguez, Mrs. Green, and Mayor Speed.
OPEN FORUM
The Open Forum was held at 7:15 p.m., prior to commencement of the Official Council Meeting.
Council President Williams declared the Open Forum in session and reminded those present that
Council is not in official session and cannot take formal action.
Mr. Richard Snyder (Newark, Delaware), noting that he had previously addressed members
regarding concerns of toxic waste being distributed on the banks of the Delaware River by the
DuPont Company, submitted additional resolutions adopted by other municipalities (Newark and
Smyrna) and again requested that the City of Dover consider the same.
Mr. Eric O’Brien, 30 N. New Street, continued statements that began during the Open Forum
Segment of the Regular Council Meeting of June 13, 2005 regarding problems of loitering, loud
music, and other quality of life issues that continue in his neighborhood. Written documentation
was submitted and is on file in the Office of the City Clerk.
The invocation was given by Chaplain Dixon, followed by the Pledge of Allegiance.
AGENDA ADDITIONS/DELETIONS
Mr. Carey moved for approval of the agenda as presented, seconded by Mr. Sadusky and
unanimously carried.
Mr. Carey moved for approval of the consent agenda, seconded by Mr. Salters and carried by
a unanimous roll call vote (Mr. Ruane absent).
ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF JUNE 13, 2005
The Minutes of the Regular Council Meeting of June 13, 2005 were unanimously approved by
motion of Mr. Carey, seconded by Mr. Salters and bore the written approval of Mayor Speed.
CERTIFICATE OF RECOGNITION - JOHN J. FRIEDMAN - 2005 SMALL BUSINESS
PERSON OF THE YEAR
Mayor Speed read and presented a Certificate of Recognition to Mr. John J. Friedman, as follows:
WHEREAS, the City of Dover realizes the important role small businesses play in maintaining and
improving the economic health of our community and that a successful business is evidence of the
independence, initiative, and hard work of the owners; and
WHEREAS, the Central Delaware Chamber of Commerce engages in activities to assist small
business persons and each year, nominates small business persons as examples of the quality of
the business persons in Central Delaware; and
Página 4
CITY COUNCIL MEETING OF JUNE 27, 2005 PAGE 2
WHEREAS, this year, the Central Delaware Chamber of Commerce has named John J. Friedman
as the 2005 Small Business Person of the Year in recognition of the growth and innovation of his
business, as well as for his community contributions; and
WHEREAS, John J. Friedman currently serves as the Chairman of the City of Dover Planning
Commission, President of the Dover 4th of July Committee, Chairman of the Community Partners
of the Air Force Association, serves on the Board of Directors for the Dover Cultural Commission,
and is the Vice President of the Economic Development Division for the Central Delaware Chamber
of Commerce; and
WHEREAS, in recognition of his distinguished service to City of Dover, it is deemed an honor and
privilege to present this
Certificate of Recognition to
JOHN J. FRIEDMAN
2005 Small Business Person of the Year
Congratulations from the Mayor and Council of the City of Dover
June 2005
Mr. Friedman thanked the Mayor and members of Council for the recognition and noted that his
success has been the result of a team effort.
PROPERTY ASSESSMENT APPEALS REPORT/PUBLIC HEARING
As indicated during their Regular Meeting of June 13, 2005, the Property Assessment Appeals
Committee extended hearings through June 17, 2005; therefore, additional recommendations of the
committee would be forthcoming. Members were provided with the Property Assessment Appeals
Report for the Hearings from May 16, 2005 through June 17, 2005.
Council President Williams reminded members that during their Regular Meeting of June 13, 2005,
Council approved Rules for the Tax Appeals Hearings to be held before City Council at this time
and place. Those appellants who have gone before the Board of Tax Appeals and wish to present
further information and appeal to the City Council may do so by submitting to the City Clerk by
12:00 noon on June 22, 2005 a written summary of why they are appealing to City Council and a
certified appraisal not more than 30 days old, which was not considered by the Board of Tax
Appeals. The City Clerk reported that no one has come forth requesting to appeal to City Council;
therefore, Council President Williams stated that a public hearing would not be necessary.
Mr. Salters moved for approval of the adjusted property values as recommended by the
Property Assessment Appeals Committee for the purposes of incorporating the adjustments
and exemptions into the City’s Tax Rolls (Exhibit #1). The motion was seconded by
Mr. Sadusky and carried by a unanimous roll call vote (Mr. Ruane absent).
Página 5
CITY COUNCIL MEETING OF JUNE 27, 2005 PAGE 3
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE REPORT -
JUNE 13, 2005
The Legislative, Finance, and Administration Committee met on June 13, 2005 with Chairman
Salters presiding.
Voluntary Donation Program
Members were provided detailed information regarding Voluntary Donation Programs.
Mrs. Tieman, Director of Administrative Services, explained that staff conducted research on these
programs as a part of their strategic goals. She noted that a Voluntary Donation Program can give
the Dover community the opportunity to help make a positive impact on the City’s Quality of Life
Task Force initiative. The program is designed to provide emergency assistance funds to groups in
crisis situations or for other community projects. The most effective way to offer and encourage
participation is through the monthly utility bill, whereby customers may find this to be a convenient,
pressure-free method of contributing at will. Customers, upon remittance of the monthly utility
payment, would check off a donation box appropriate to the additional contribution they wish to
enclose. These programs are successful and widely implemented with municipalities and businesses
across the country.
Based on their research, staff suggested that the City develop such a program to be known as “Dover
Cares Contribution Program” and that the method for its development include changes to the utility
bill form to include donation box information by changing the order with the printer, which appears
to be the easiest and least costly way to proceed with this program. Mrs. Tieman stated that the
steps necessary to accomplish this are minimal. She explained that customers would be sent
information regarding donation programs once per year. New customers would receive this
information when they initiate service. Customers would have the option of simply checking the
desired donation box(es) and add amount to total of utility payments throughout the year.
During the committee meeting, Mrs. Tieman advised members that staff would like the contributions
to be distributed among the following funds and agencies: Utility Assistance - Administrative
Services; Parks Improvement and Programs - Parks and Recreation; Library Programs - Library and
Arts Program-Arts Council. Staff recommended that the Administrative Services Department be
permitted to implement the program as recommended in the report provided.
The committee recommended acceptance of the concept of the Voluntary Donation Program as
outlined by staff and that staff report back to members more details regarding the program.
By consent agenda, Mr. Carey moved for approval of the committee’s recommendation,
seconded by Mr. Salters and carried by a unanimous roll call vote (Mr. Ruane absent).
By consent agenda, Mr. Carey moved for acceptance of the Legislative, Finance, and
Administration Committee Report, seconded by Mr. Salters and carried by a unanimous roll
call vote (Mr. Ruane absent).
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE REPORT -
JUNE 14, 2005
The Parks, Recreation, and Community Enhancement Committee met on June 14, 2005 with
Chairman Sadusky presiding.
Página 6
CITY COUNCIL MEETING OF JUNE 27, 2005 PAGE 4
Neighborhood Open Space - Somerset Park Subdivision: Request for Cash-in-Lieu of
Recreation Area Construction
Members considered a request for cash-in-lieu of recreation area construction for the Somerset Park
Subdivision, which proposes a total of 14 residential units on 12.5733+/- acres. In accordance with
Article 5, Section 10, Subsection 10.17 of the Zoning Code, if the commission determines that the
construction of recreation is not practical due to close proximity to existing available recreation
facilities or infeasible due to natural characteristics of the land or will not benefit the residents of
the development, the commission shall require a full or partial cash in lieu of areas of donation to
be made by the developer in lieu of a full or partial dedication of land. Also, in accordance with
Article 5, Section 10, Subsection 10.173, the cash donation shall be equivalent to the appraised value
of land area required in Section 10.16 of the Zoning Code. For the Somerset Park Subdivision, the
cash donation based on the submitted appraised raw land value is $38,573.80 per acre. For the .5
acres of land that is required for this area, the amount of cash donation is $19,286.90
Staff provided the following review of the request for cash-in-lieu of recreation area construction.
A recommendation is also provided regarding the other proposed open space areas (woodland,
wetland, and stormwater facilities):
1. Staff recommended approval of a cash donation of $19,286.90 in lieu of recreation area
construction.
2. The applicant should be aware of the requirements for payment of the cash in lieu of
recreation area construction as associated with the development of the residential units.
Article 5 §10.175 Payment of Cash Donation. One hundred (100) percent cash donation
provided under this section shall be collected prior to issuing the first building permit for the
development .
3. There shall be provisions which insure that the common open space land shall continue
as such and be properly managed and maintained. These provisions shall be in a form
acceptable to the City of Dover. The developer shall either retain ownership and
responsibility for maintenance of such open land; or provide for and establish one (1)
or more organizations for the ownership and maintenance of all common open space i.e.
a Homeowners Association. The organization shall be responsible for maintenance,
insurance and taxes on the common open space.
The committee recommended approval of the Neighborhood Open Space - Somerset Park
Subdivision: Request for cash-in-lieu of recreation area construction, as well as the staff
recommendations contained in the report on the basis that it is infeasible due to natural
characteristics of the land as stated in the Dover Code of Ordinances, Appendix B, Article 5, Section
10.171.
By consent agenda, Mr. Carey moved to approve the committee’s recommendation for
approval of a cash donation in the amount of $19,286.90 in lieu of recreation area construction
for the Somerset Park Subdivision. The motion was seconded by Mr. Salters and carried by
a unanimous roll call vote (Mr. Ruane absent).
Página 7
CITY COUNCIL MEETING OF JUNE 27, 2005 PAGE 5
The committee also recommended that the Department of Planning and Inspections procedurally
incorporate into their review an opportunity for the City Assessor’s Office to look at any appraisals
that are submitted for the purpose of cash-in-lieu.
By consent agenda, Mr. Carey moved for approval of the committee’s recommendation and
directed the Department of Planning and Inspections to incorporate into their procedural
review an opportunity for the City Assessor’s Office to look at any appraisals that are
submitted for the purpose of cash-in-lieu. The motion was seconded by Mr. Salters and
carried by a unanimous roll call vote (Mr. Ruane absent).
By consent agenda, Mr. Carey moved for acceptance of the Parks, Recreation, and
Community Enhancement Committee Report, seconded by Mr. Salters and carried by a
unanimous roll call vote (Mr. Ruane absent).
MONTHLY REPORTS - MAY 2005
By motion of Mr. Carey, seconded by Mr. Salters, the following monthly reports were
accepted by consent agenda:
Budget Report
Chief of Police Report
City Clerk/Alderman Report (Fines)
City Manager's Report
Mayor's Report
Planning and Inspections Report
Robbins Hose Company No. 1 Report
EVALUATION OF BID - AUTOMATED SUMMONS PROCESSING SYSTEM UPGRADE
The Police Department is in the process of upgrading and replacing the program that is currently
used for processing summons violations. This system processes and tracks all City ordinance
violations, including parking tickets, alarms, inspections, and others. It was noted that the current
system was programmed by Enforcement Technology, Inc. and that the upgrade would be sole
sourced to maintain interoperability. Staff recommended approval of the following purchases:
Component Vendor Status Cost
AutoProcess software Enforcement Tech. Sole Vendor $46,300
AutoCite software & hardware Enforcement Tech. Sole Vendor 10,080
Server Dell State Contract 4,500
Oracle database server software Insight State Contract 1,470
Total $62,350
Funding from two (2) grant sources has been obtained for this purchase: State Law Enforcement
Assistance Fund (SLEAF), in the amount of $50,000; and Local Law Enforcement Grant (LLEBG),
in the amount of $12,350.
Página 8
CITY COUNCIL MEETING OF JUNE 27, 2005 PAGE 6
Mr. Carey moved for approval of the automated summons processing system upgrade as
recommended by staff. The motion was seconded by Mr. Sadusky and carried by a unanimous
roll call vote (Mr. Ruane absent).
EVALUATION OF BID - AMENDMENT TO BASIC LIFE SUPPORT CONTRACT
Members were advised that, in accordance with Section I, Definitions, and Section IX, Personnel,
of the current three-year basic life support contract with PrimeCare (dated June 2003), ambulances
providing services to the City must be staffed by two (2) NREMT-Bs. A letter has been received
from Mr. Larry Bradley, CEO of PrimeCare Medical Transport, LLC, requesting that the contract
be amended to allow for EMT-Bs rather than NREMT-Bs. He explained that the State of Delaware
does not require EMT-B’s to keep their “NR” (Nationally Registered) after the first two (2) years.
Mr. DePrima, City Manager, explained that the amendment would enable all qualified EMT-Bs
employed by PrimeCare to provide services to the City of Dover rather than just those who are
nationally registered and that the contract would be equivalent to the guidelines of the State of
Delaware and the Fire Commission. Staff recommended approval of the amendment to the contract
with PrimeCare as requested.
Mr. Hogan moved for approval of staff’s recommendation, seconded by Mr. Salters.
Responding to Mr. Ritter, Mr. Carey explained that 36 hours of training are required for Delaware
Certification and 72 hours of training are required for National Registration. Mr. Salters relayed
concerns, feeling that the City may be lowering their standards. It was Mr. Carey’s opinion that as
long as the EMT-Bs had originally been “NREMT-Bs” (Nationally Registered), and continue to
obtain Delaware Certification, the City would continue to receive quality care and services.
Mr. Carey moved to amend the amendment to the contract by stipulating that the EMT-Bs
must have been “NREMT-Bs” (Nationally Registered) before being accepted as “EMT’Bs”.
The motion was seconded by Mr. Slavin and carried with Mr. Salters not voting.
The motion to approve the amendment to the Basic Life Support Contract with PrimeCare,
as amended, was carried by a roll call vote of seven (7) yes, one (1) abstention (Mr. Salters),
and one (1) absent (Mr. Ruane).
CONTRACT RENEWAL WITH DELAWARE PARENT ASSOCIATION TO IMPLEMENT
CREATING LASTING FAMILY CONNECTIONS PROGRAM
The City of Dover’s Delaware Prevention Network Program (DPN), which has been in existence
for 15 years, is administered by the State of Delaware Department of Services for Children, Youth
and Their Families, Office of Prevention and Early Intervention. The DPN Program is a specific
science-based program known as Creating Lasting Family Connection (CLFC), which is a
comprehensive family strengthening, substance abuse, and violence prevention curriculum that has
scientifically demonstrated that youth and families in high-risk environments can be assisted to
become strong, healthy, and supportive people. The CLFC will serve 15 to 20 youth and their
families over a 20-week period allowing two (2) sessions during the contract year. The City
contracted with the Delaware Parents Association to implement this program during the past two
(2) years, and it has done an outstanding job.
Página 9
CITY COUNCIL MEETING OF JUNE 27, 2005 PAGE 7
Staff recommended approval of the contract with the Delaware Parents Association for program
implementation at a cost not to exceed $67,000 for a period of July 1, 2005 through June 30, 2006,
with an amount of $3,000 allotted for administrative costs. Funding, in the amount of $70,000, will
be provided by the State of Delaware Department of Services for Children, Youth and Their
Families, Office of Prevention and Early Intervention.
Mr. Salters moved for approval of staff’s recommendation, seconded by Mr. Pitts and carried
by a unanimous roll call vote (Mr. Ruane absent).
REAPPOINTMENTS - PLANNING COMMISSION (3 YEAR TERMS TO EXPIRE
JUNE 1, 2008) - MAYOR SPEED
Mayor Speed requested the following reappointments to the Planning Commission for a three (3)
year term to expire June 1, 2008:
Mr. Francis C. Nichols (First District)
Ret. Col. Robert D. Welsh (Second District)
Mr. Fred Tolbert (Third District)
By consent agenda, Mr. Carey moved for approval of the reappointments to the Planning
Commission as recommended by Mayor Speed, seconded by Mr. Salters and carried by a
unanimous roll call vote (Mr. Ruane absent).
REAPPOINTMENT - SILVER LAKE COMMISSION (ANNUAL APPOINTMENT; TERM
TO EXPIRE MAY 2006) - MAYOR SPEED
Mayor Speed requested the reappointment of Ms. Cheryl Biddle to the Silver Lake Commission for
a term to expire May 2006.
By consent agenda, Mr. Carey moved for approval of the reappointment of Ms. Biddle to the
Silver Lake Commission as recommended by Mayor Speed, seconded by Mr. Salters and
carried by a unanimous roll call vote (Mr. Ruane absent).
REZONING REQUEST/FIRST READING - 487 S. QUEEN STREET, OWNED BY
MICHAEL SANCHEZ
A request was received to rezone property located at 487 S. Queen Street, owned by Michael
Sanchez. The property is currently zoned C-1 (Neighborhood Commercial) and the requested
zoning is C1-A (Limited Commercial). Prior to amending the zoning ordinances and zoning map
of the City of Dover, a public hearing is required.
Mr. Carey moved to refer the request to the Planning Commission on July 18, 2005 and set a
public hearing before City Council for August 8, 2005 at 7:30 p.m. as suggested by staff. The
motion was seconded by Mr. Pitts and unanimously carried.
In accordance with Section 1-6 of the Dover Code, Council acknowledged the First Reading of the
Zoning Ordinance Amendments as read by the City Clerk, by title only, as follows:
AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY LOCATED
AT 487 SOUTH QUEEN STREET.
Página 10
CITY COUNCIL MEETING OF JUNE 27, 2005 PAGE 8
FINAL READING - PROPOSED ORDINANCES
The First Reading of the following proposed ordinances was accomplished during the Council
Meeting of June 13, 2005.
Mr. Hogan moved that the Final Reading of the proposed ordinances be acknowledged by title
only, seconded by Mr. Salters and unanimously carried.
Notification of Tax Rate Increase Over the Rolled Back Tax Rate [Required in accordance
with 22 Delaware Code Section 1105(b)]
Mr. DePrima advised members that as a result of the Tax Appeal Hearings and the Property Tax
Exemption for Senior Citizens, the revenues originally projected for the 2005/2006 Budget were
low. He recommended that the proposed ordinance be amended to reduce the tax rate by .01¢,
which would also result in the rolled-back tax rate to be 9.65%, by amending the last paragraph as
follows: striking $.34 and inserting in lieu thereof $.33 and striking 9.68% and inserting in lieu
thereof 9.65%.
Mr. Slavin moved for adoption of the Notification of Tax Rate Increase Over the Rolled Back Tax
Rate, as amended, seconded by Mr. Sadusky.
Mr. Hogan reiterated his feeling that although the budget was well prepared, it contained some items
that were wanted and not necessarily needed, and; therefore, expenditures could have been further
reduced.
Mr. Ritter moved to amend the ordinance to maintain the current tax rate, by striking $.34 and
inserting in lieu thereof $.31. The motion failed for the lack of a second.
The motion for adoption of the following ordinance was carried by a roll call vote of six (6) yes,
two (2) no (Mr. Ritter and Mr. Hogan) and one (1) absent (Mr. Ruane):
Budget Ordinances - 2004/2005 Revised and 2005/2006 City of Dover Budget
Mr. Hogan moved for adoption of the 2004/2005 Revised and 2005/2006 City of Dover Budget
Ordinances (Exhibit #2), seconded by Mr. Carey and carried by roll call vote of seven (7) yes,
one (1) no (Mr. Ritter) and one (1) absent (Mr. Ruane).
Downtown Dover Business Improvement District - Cash Receipts/Budget FY 2005-2006
Mr. Carey moved for adoption of the Downtown Dover Business Improvement District Budget
for FY 2005-2006, seconded by Mr. Salters and by a unanimous roll call vote (Mr. Ruane
absent), Council adopted the following ordinance:
DOWNTOWN DOVER BUSINESS IMPROVEMENT DISTRICT
CASH RECEIPTS BUDGET FOR 2005-06
BID TAX REVENUE AND EXPENSES CHARGED AGAINST THIS REVENUE
ADMINISTERED THROUGH MAIN STREET, INC.
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
COUNCIL MET:
Página 11
CITY COUNCIL MEETING OF JUNE 27, 2005 PAGE 9
1. The amount hereinafter named aggregating Fifty thousand, two hundred and sixty-five
dollars ($50,265) or so much thereof as may be necessary are hereby appropriated from
current revenues and other funds for the use by the City of Dover/Main Street, Inc. for the
fiscal year beginning July 1, 2005, and ending June 30, 2006:
REVENUE PROPOSED
Tax Revenue $50,265
EXPENSES
Salary and Personnel Costs $50,265
ADOPTED: JUNE 27, 2005
Recodification Ordinance - City of Dover Code of Ordinances
Mr. Salters moved for adoption of the Recodification Ordinance, seconded by Mr. Hogan, and
by a unanimous roll call vote (Mr. Ruane absent), Council adopted the following ordinance:
AN ORDINANCE ADOPTING AND ENACTING A NEW CODE FOR THE CITY OF DOVER
DELAWARE; PROVIDING FOR THE REPEAL OF CERTAIN ORDINANCES NOT INCLUDED
THEREIN; PROVIDING A PENALTY FOR THE VIOLATION THEREOF; PROVIDING FOR
THE MANNER OF AMENDING SUCH CODE; AND PROVIDING WHEN SUCH CODE AND
THIS ORDINANCE SHALL BECOME EFFECTIVE.
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER IN COUNCIL
MET:
Section 1. The Code entitled "Code of Ordinances, City of Dover, Delaware," published by
Municipal Code Corporation, consisting of chapters 1 through 118, each inclusive, is adopted.
Section 2. All ordinances of a general and permanent nature enacted on or before March 14, 2005,
and not included in the Code or recognized and continued in force by reference therein, are repealed.
Section 3. The repeal provided for in section 2 hereof shall not be construed to revive any ordinance
or part thereof that has been repealed by a subsequent ordinance that is repealed by this ordinance.
Section 4. Unless another penalty is expressly provided, every person convicted of a violation of any
provision of the Code or any ordinance of the city shall be punished by a fine of not less than $25.00
nor more than $1,000.00. Each act of violation and each day upon which any such violation shall
continue or occur shall constitute a separate offense. The penalty provided by this section, unless
another penalty is expressly provided, shall apply to the amendment of any Code section, whether
or not such penalty is reenacted in the amendatory ordinance. In addition to the penalty prescribed
above, the city may pursue other remedies such as abatement of nuisances, injunctive relief and
revocation of licenses or permits.
Página 12
CITY COUNCIL MEETING OF JUNE 27, 2005 PAGE 10
Section 5. Additions or amendments to the Code when passed in such form as to indicate the
intention of the city council to make the same a part of the Code shall be deemed to be incorporated
in the Code, so that reference to the Code includes the additions and amendments.
Section 6. Ordinances adopted after March 14, 2005, that amend or refer to ordinances that have
been codified in the Code shall be construed as if they amend or refer to like provisions of the Code.
Section 7. This ordinance shall before effective June 28, 2005 at 12:01 a.m.
ADOPTED: June 27, 2005
COUNCIL MEMBERS COMMENTS
Mr. Hogan explained his vote in opposition to the tax rate increase, feeling that the City has simply
gone too far too soon. Although he felt that staff produced a stringent budget, it was his feeling that
the obligations could be met with a .01¢ to .02¢ tax increase.
Mr. Salters thanked everyone that participated in this year’s African American Festival, indicating
that it was very successful.
Mr. Slavin moved for adjournment, seconded by Mr. Sadusky and unanimously carried.
Meeting Adjourned at 8:20 P.M.
JANICE C. GREEN
CITY CLERK
All orders, ordinances, and resolutions adopted by City Council during their Regular Meeting of
June 27, 2005, are hereby approved.
STEPHEN R. SPEED
MAYOR
/JG
S:\ClerksOffice\Agendas&Minutes\Council-Minutes\2005\06-27-2005 Council.wpd
Exhibits Attached to Original Minutes and File Copy
Exhibit #1 - Property Assessment Appeals Report for the Hearings from May 16, 2005 through June 17, 2005
Exhibit #2 - 2004/2005 Revised and 2005/2006 City of Dover Budget Ordinances
Página 13
PETITION TO AMEND ZONING DISTRICT
Before The Dover City Council
July 11, 2005
Plan Title: Lands of Eden Hill Farm
Z-05-03
Plan Type: Rezoning to Traditional Neighborhood Design Zone and General
Overall Master Plan Review
Applicants/Owners: Eden Hill Farm Inc.
State of Delaware
Applicants/Equitable Owners: Investment Properties Associates, LLC
Dover Medical Properties, LLC
Project Engineers/Architects: Becker Morgan Group
Location: 834 W. North Street located on the south side of West North Street
and west of the railroad corridor and West Street
Tax Parcels: ED-05-076.00-01-13.00-000
ED-05-076.00-01-14.00-000
ED-05-076.00-01-14.01-000
Area of Rezoning: 272.04 acres +/-
Present Zoning: IPM (Industrial Park Manufacturing)
A (Agriculture)
Proposed Zoning: TND (Traditional Neighborhood Design Zone) allows for the
creation of a walkable, pedestrian friendly mixed use neighborhood
with residential, commercial, and professional office areas.
Present Use: Residence
Agricultural land and woodland areas
Proposed Use: Traditional Neighborhood Design with residential, commercial,
office, and open space areas
Página 14
Z-05-03 Lands of Eden Hill Farm: Rezoning to TND and General Overall Master Plan Review
Planning Commission Recommendation Report
Page 2 of 19
Findings and Recommendations of the Dover Planning Commission
This petition was considered at the June 20, 2005 meeting of the Planning Commission. The
following members were present: Chairman Mr. Friedman, Mr. DiMondi, Mr. Tolbert, Mr.
Nichols, Mr. Holt, Mr. VonReider, and Col. Welsh.
The Planning Commission recommends approval of this request (Rezoning application Z-
05-03) Lands of Eden Hill Farm, Inc. at 834 West North Street to rezone three (3) parcels
consisting of 272.04 acres ± of land from IPM (Industrial Park Manufacturing) and A
(Agriculture) to TND (Traditional Neighborhood Design). The subject parcels are located
on the south side of West North Street and west of the railroad corridor and West Street.
As part of the Planning Commission recommendation of approval for the rezoning of the
subject area to Traditional Neighborhood Design zone (TND), the Planning Commission
also recommends acceptance of the General Overall Master Plan including the Master
Comprehensive Development Standards Manual (Pattern Book) with its addendum of
6/9/05 for the project in accordance with the conditions of approval outlined in the
Development Advisory Committee (DAC) comments. The motion for approval of the
rezoning passed 7-0 of those members present.
The following information was considered by the Planning Commission in addition to the
guidance provided in the Zoning Ordinance:
Traditional Neighborhood Design Zone Ordinance
On November 8, 2004 the Dover City Council approved an amendment to the City of Dover
Code, Appendix B: Zoning Ordinance, Article 3 - District Regulations creating Article 3,
Section 28: Traditional Neighborhood Design Zone (TND). (Application MI-04-05) This
amendment established the development criteria and procedure for the Traditional Neighborhood
Design Zone (TND). The first step of the Traditional Neighborhood Design Zone is an
application for rezoning to TND which includes review of a Master Plan. The subsequent steps
in the process include review of the Implementation Plan and Site Plans/Subdivision Plans.
As the Zoning Ordinance states, “the intent of the Traditional Neighborhood Design (TND) zone
is to create a walkable and pedestrian-friendly, economically viable professional, commercial
and mixed use residential neighborhood for people of different ages and incomes that draw from
the best architectural and community design features of Delaware and the Delmarva Peninsula
from its colonial past to the mid 20th century.” The TND zone intends to encourage greater
integration of land-uses and diversity of lot sizes than is permitted under other provisions of the
Land Subdivision Regulations and Zoning Ordinance of the City of Dover.
Traditional Neighborhood Design Zone: Step 1-Rezoning & General Overall Master Plan Review
The first step this process is a Rezoning application including review of a General Overall
Master Plan. See Procedure in Article 3 §28.4. The application submission for Step 1 consists of
the following items.
Página 15
Z-05-03 Lands of Eden Hill Farm: Rezoning to TND and General Overall Master Plan Review
Planning Commission Recommendation Report
Page 3 of 19
• Site Plan Map of Existing Conditions providing items listed in Zoning Ordinance, Article
10, Section 5.18
• Narrative on the nature of the applicant’s interest
• Listing of the development team involved in the proposed development
• General Overall Master Plan consisting of a set of maps composed showing:
o Plans of existing natural features showing topography, soils, drainage vegetation
and potential limitations to development
o Plans of the proposed building areas, streets, roads, parking, open space and storm
water management
o Overall program of uses including showing general use location, proposed
building height, and total gross square feet by use
• Master Comprehensive Development Standards Manual
A document prepared in narrative and graphic form for purpose of showing that the proposed
development meets the purpose and intent of the TND and that explains the concepts behind
the implementation of the proposed TND on the parcel. The Master Comprehensive
Development Standards Manual consists of brief written and graphic descriptions of the
proposed approach to each of the items following items:
o Historical Precedents and their influence on proposed project
o Circulation (system of streets, alleys, and pedestrian and bicycle routes)
o Building Lots (proposed lot types, sizes and setbacks, building locations)
o Buildings (architectural character of the residential, commercial, office and
mixed-use buildings)
o Accessory Structures (fences, sheds, pools, garages, gazebos, etc.)
o Open Spaces
o Landscape Design (hard materials, plant materials, street furniture, etc.)
o Lighting design
o Signage
o Application and Administration of requirements and guidelines
Request for Submission of Implementation Plans by District
The TND code provisions provide for the opportunity to submit separate Implementation Plans
by individual use districts (Residential, Commercial or Office). The review of the
Implementation Plan is the second step in the TND procedure. The Planning Commission
reviews the TND Implementation Plan(s) for compliance with the approved General Overall
Master Plan. However, in order to separate Implementation Plan submissions additional
information is required at the time of Rezoning and General Master Plan review. “To request
such consideration, the submission of the General Overall Master Plan shall include more detail
of the design elements of the project, including, but not limited to, architectural standards, design
relationships between uses and different scales of buildings, parking and open spaces, and an
explanation of how the segregated Implementation Plan conforms to the intent of the approved
General Overall Master Plan.” (Article 3 §28.42.)
Plan Summary for Application Z-05-03 Lands of Eden Hill Farm:
This application proposes the rezoning of the Lands of Eden Hill Farm, Inc. at 834 West North
Página 16
Z-05-03 Lands of Eden Hill Farm: Rezoning to TND and General Overall Master Plan Review
Planning Commission Recommendation Report
Page 4 of 19
Street from IPM and A to TND. The subject area consists of three (3) parcels consisting of
272.04 acres ± of land. The properties are currently zoned IPM (Industrial Park Manufacturing)
and A (Agriculture). The proposed zoning classification is TND (Traditional Neighborhood
Design). The subject parcels are located on the south side of West North Street and west of the
railroad corridor and West Street. The owners of record are Eden Hill Farm, Inc. and the State of
Delaware. The equitable owners are Investment Properties Associates, LLC and Dover Medical
Properties, LLC. Tax Parcels: ED-05-076.00-01-13.00-000, ED-05-076.00-01-14.00-000 and
ED-05-076.00-01-14.01-000.
Surrounding Land Uses:
The area of petition to be considered for rezoning is located on the south side of West North
Street between the railroad corridor and the intersection of West North with Saulsbury Road.
The land to the west of the subject property is zoned IPM (Institutional Park Manufacturing
Zone) and includes Kraft-General Foods facility and other large industrial facilities. To the
north across West North Street is the residential area known as Lincoln Park. It is zoned RG-1
(General Residence Zone) and primarily consists of single family dwellings with some multi-
family development. To the northeast and east of the subject site adjacent to the railroad corridor
are properties zoned IO (Institutional and Office Zone), C-3 (Service Commercial Zone), and C-
1A (Limited Commercial Zone). This area includes the area targeted for redevelopment as part
of the West Side Redevelopment Plan and existing office buildings, a court building, the Dover
Police Station, service establishments, and retail establishments. To the southeast across the
railroad corridor and New Burton Road are the residential areas zoned R-8 and R-10 (One
Family Residence Zone) known as Sherwood, Woodbrook, and Crossgates. The Puncheon Run
is just south of the subject area and further to the south are agricultural lands currently zoned R-
20 (One Family Residence Zone).
Comprehensive Planning
The Land Development Plan Map of the Comprehensive Plan Update 2003 as amended shows
this area as Mixed Use. Within Chapter 11: Land Development Plan, the “Mixed Use” land use
category is described and includes information on the Eden Hill Farm property specifically. The
Plan recognized the potential opportunity for development with a mixed use focus. A series of
goals were outlined including: encouraging the creation of neighborhood centers with mixed use
development, pedestrian friendly public environments and opportunities for connections to
future transit; clustering of activities in walkable distances; and development design ideas for
building and parking locations. (See Comprehensive Plan Update 2003 as amended, Chapter 11
– pages 132-134).
Preliminary Land Use Services Review (PLUS)
The Traditional Neighborhood Design Rezoning Application/ Master Plan application was
reviewed during December 2004 by the Preliminary Land Use Services as required by the City
of Dover’s Memorandum of Understanding (MOU). This MOU requires certain types of projects
complete the PLUS Review process prior to application submission. See attached PLUS Review
comment letter dated January 7, 2005. The applicant has submitted a letter dated June 6, 2005 in
response to the PLUS comments. Staff notes that some areas the Master Plan has been further
revised since the Draft Master Plan was submitted for the PLUS review; however, the overall
concept of the Master Plan remains the same.
Página 17
Z-05-03 Lands of Eden Hill Farm: Rezoning to TND and General Overall Master Plan Review
Planning Commission Recommendation Report
Page 5 of 19
Determination of Eligibility for TND
The land area must meet certain eligibility requirements to be rezoned to Traditional
Neighborhood Design (TND) (See Article 3 §28.3 a,b,c,d). The review of these criteria for the
subject application is as follows.
Criteria Eden Hill Farm TND proposal
The land area shall have access to an existing or planned Land area has access from West North Street and the
arterial or collector road proposed continuation of Saulsbury Road. Saulsbury
Road and portions of West North Street are considered
minor arterials and part of North Street is a collector
road.
The land area shall be served by adequate existing or Utilities such as water and sewer are in the vicinity of
planned infrastructure this land area. The proposed project will build additional
infrastructure as required. This is subject to the
Department of Public Works review.
The land area may contain a single or multiple parcels. The land area consists of three parcels of land totaling
The rezoning application for the land area shall be filed 272.04 acres. All current property owners and equitable
jointly by all owners of the involved land area owners are participating in the application submission.
Finding by the Planning Commission and City Council The Planning Commission public hearing and review is
that the proposed TND location is generally consistent scheduled for June 20, 2005 with the City Council
with the Comprehensive Plan public hearing and review on July 11, 2005. The Land
Development Plan of the Comprehensive Plan Update
2003 identifies this land area with the land use category
of Mixed Use.
Request for TND (Traditional Neighborhood Design Zone)
The types of permitted uses with the Traditional Neighborhood Design Zone are outlined in
Article 3 §28.5:
28.51 Uses allowed in all areas of the TND:
28.511 All residential uses, accessory uses, and conditional uses currently permitted in
the residential zones of the City identified in Article 3, Sections 1, 2, 3, 4, 5, 6, 7 and 9. Proposed
conditional uses shall be identified in the application to the Planning Commission.
28.512 Accessory dwelling units in conjunction with detached single-family houses. A
maximum of one accessory dwelling unit shall be permitted in conjunction with a detached
single-family house.
28.513 Open space.
28.514 Civic uses including, but not necessarily limited to:
a) Government buildings;
b) Education buildings;
c) Libraries;
d) Meeting halls;
e) Museums;
f) Recreational facilities;
g) Places of Worship;
h) Other cultural, civic or social use as designated on the approved
Implementation Plan.
28.52 Neighborhood Commercial District: Additional uses permitted in this district include
the following subject to the requirements set forth in subsection 28.7:
Página 18
Z-05-03 Lands of Eden Hill Farm: Rezoning to TND and General Overall Master Plan Review
Planning Commission Recommendation Report
Page 6 of 19
28.521 Convenience retail stores such as, but not limited to, drug stores, grocery stores,
restaurants, variety stores, or combinations thereof. Drive through drug stores shall be allowed if
they are of superior design and screening consistent with the intent of the TND zone. There shall
be no drive-through restaurants.
28.522 Personal service stores such as, but not limited to, barber shops, beauty parlors,
and laundry/dry cleaning establishments.
28.523 Service establishments furnishing services other than of a personal nature, but
excluding gasoline filling stations and motor vehicle storage, repair, or service.
28.524 Business, professional, and government offices, banks, philanthropic or not-for-
profit offices, and financial institutions. Drive through banks shall be allowed if they are of
superior design and screening consistent with the intent of the TND zone.
28.525 Any of these uses mixed with residential uses in the same building.
28.53 Professional Office, Medical, and Financial District: Additional uses permitted in this
district include the following, subject to the requirements set forth in subsection 28.7:
28.531 Business, professional, and government offices, banks, philanthropic or not-for-
profit offices, and financial institutions. Drive through banks shall be allowed if they are of
superior design and screening consistent with the intent of the TND zone.
28.532 Medical and dental offices including clinics, laboratories, and hospital services.
Drug stores, eye wear sales, and similar medical related retail uses, along with
luncheonettes or delicatessens shall be allowed if designed as an accessory use or
tenant space in a medical office building.
28.533 Nursing or extended care facilities offering overnight accommodations
Eden Hill Farm TND General Overall Master Plan Review
The application has provided a Site Plan Map including information on the existing conditions
including information on the parcels involved in the proposal, existing buildings, woodland
areas, topography, and other data information. See Parcel Plan sheet.
The applicant has supplied a narrative on the nature of the applicant’s interest and a listing of the
development team involved in the proposed development. Some of this information is also
provided with the plan sheets and Master Standards Manual submission.
General Overall Master Plan
The General Overall Master Plan consists of a set of plan maps (Parcel Plan sheet and Master
Plan sheet in color) showing: existing natural features, proposed building areas, location of
streets/roads, parking options, location of open space, and stormwater management areas. The
overall program of uses is identified. Additional information on these topics is also included in
the Master Standards Manual (Pattern Book) document.
The Eden Hill Farm TND Master Plan identifies development areas as a Residential District,
Neighborhood Commercial District (with the opportunity for residential uses), and Professional
Office, Medical, and Financial District. The Residential District includes a total of 665
residential units in the form of single family detached houses, single family detached houses with
Página 19
Z-05-03 Lands of Eden Hill Farm: Rezoning to TND and General Overall Master Plan Review
Planning Commission Recommendation Report
Page 7 of 19
carriage houses (second dwelling unit on lot), duplex units, townhouses, and condominium
buildings. The lot sizes are developed on a module system which would allow for the mixing of
unit types within a given street block. The Residential District has a mix of street sections with
sidewalks, pedestrian network, parking options, and landscaping. The street network also
includes a service alley system.
The Neighborhood Commercial District area located in the northwest corner of the site consists
of a variety of building forms with provisions for a grocery store, drug store with drive-thru,
bank with drive-thru, retail and office buildings. Several buildings also provide the option for
residential uses on the upper floors. A portion of this Commercial District is focused on a ‘main
street’ which connects to the existing street network at West North Street and also links to the
internal street network and pedestrian network. Parking in this area includes on street and the
traditional parking lot format but with increased landscaping and pedestrian amenities.
The Professional Office, Medical and Financial District area is located in the northeast portion
of the site and consists of a series of multi-story office buildings. A portion of this office district
is focused on a ‘main street’ which connects to the existing street network at West North Street
as a continuation of Clarence Street. The area is also linked to the internal street network and
pedestrian network. A large green space is also central to the area. Parking in this area includes
on street and the traditional parking lot format but with increased landscaping and pedestrian
amenities. The parking space calculation is approximately 1 (one) parking space per 250 square
feet of building floor area. A future parking structure is also proposed within this area to serve
buildings located on the eastern part of the site.
The overall site exceeds the minimum of 25% open space by creating a community walking trail
area, parks, and greens throughout the site and large open space/park area in the southwest
portion of the site. The existing historic house of Eden Hill Farm and its tree allees (entrance
drives) are preserved within a large public open space area.
Master Comprehensive Development Standards Manual
The Master Comprehensive Development Standards Manual consist of a brief written and
graphic description of the owner/developer’s proposed approach to each of the items listed in
Article 3§28.84. The purpose of this document is “to insure that the owner/developer gives
adequate thought to the nature of a TND designation and understands the impacts of such a
designation on site development.” For this application, the submission includes a document
entitled Eden Hill Farm: Pattern Book (First Edition – May 6, 2005). An ADDENDUM to the
Pattern Book was submitted on June 9, 2005. The Addendum highlights some revisions and
clarifications to the Pattern Book dated May 6, 2005. The Pattern Book presents information on
the overall plan, typical urban spaces, and individual buildings.
The following table lists required items to be included in the Master Comprehensive
Development Standards Manual (Zoning Ordinance, Article 3 §28.84). The Eden Hill Farm:
Pattern Book (and Addendum of 6/9/2005) presents information on each of these topic areas.
Following Master Plan approval, the process will require greater detail on each of these elements
as part of the Implementation Plan submission.
Element Pattern Book Reference
Página 20
Z-05-03 Lands of Eden Hill Farm: Rezoning to TND and General Overall Master Plan Review
Planning Commission Recommendation Report
Page 8 of 19
Historical Precedents – a discussion and illustration of Section A, pages 1-9
local and regional precedents in the design of the City of Also building examples in Sections C,
Dover’s traditional neighborhoods, communities, buildings, D, and E
and landscape and how they will be reflected in the
proposed development.
Circulation – classification and illustration of a system of Section B, pages 10-38
streets, alleys, and pedestrian and bicycle routes that creates Section B2 - Street Types
an integrated network serving the TND development and Section B3 - Pedestrian Way
links it to adjacent areas. Detailed design standards and Section C - concepts for driveway
illustrations for each component of the system are required. access in residential district
A plan of the circulation systems shall be included Also Master Plan Map
Building Lots – a classification and illustration of the full Section C, pages 39-62 for Residential
range of proposed lot types, sizes and setbacks, locations of District
potential accessory buildings, and access by auto and foot. Section C.1 – Lot Types
A plan of their location throughout the development shall Section E, pages 74-91 for Commercial
be included. and Office Districts
Also Master Plan Map
Buildings – a classification of the full range of buildings, Section C, pages 39-62 and Section D,
residential, commercial, office or mixed, to be constructed pages 63-73 for Residential District
including detailed guidelines addressing their architectural Section E, pages 74-91 for Commercial
character and essential required elements, such as size, and Office Districts
composition and massing, windows, doors, porches, roof Also Master Plan Map
design, fenestration, and all materials. A plan of their
location by use type throughout the development shall be
included.
Accessory Structures – detailed design guidelines for Section D6, pages 71-73 for garages
accessory structures including, but not limited to, fences, and carriage houses in residential
sheds, pools, garages, gazebos shall be included and district
compatible with the TND design principles. Also Section C – lot layout examples
by building type
Section F.4, page 95 - Fences
Open Spaces - a classification of a system of landscaped Section B, pages 10-38
open spaces (in addition to private yards) with a plan of the Section B.4 – Open Space (Active and
network created by the open spaces and pedestrian and Passive)
bicycle circulation systems. Section C.7-C.14
Also Master Plan Map
Landscape Design – a palette of hard (paving) and plant Section F, pages 92-97
materials along with street furniture, major focal elements Section F.2 – Site Furnishings
and ornamentation shall be provided. These shall be Section F.3 – Hardscape
located on a plan of the development. Details of plant Section F.5 – Landscape
species and hard materials shall be included.
Lighting Design – Placement of public and private lighting Section F.1, page 92 – Lighting
throughout the development and design of the lighting Also Section B.2 – Street Types
fixtures, globes, illumination patterns and intensities.
Signage – Provide the design, size, height and placement of Section E.13, page 91
all signs for public and private uses in the neighborhood. Section F.2, page 93 – Street name
Include standards for street signs, parking signs, fire lanes, signs
and signs for businesses in residential, office and
Página 21
Z-05-03 Lands of Eden Hill Farm: Rezoning to TND and General Overall Master Plan Review
Planning Commission Recommendation Report
Page 9 of 19
commercial districts.
Application and Administration – a presentation of the Forward, page I
manner in which the Comprehensive Development Sections D and E: Architectural
Standards Manual requirements and guidelines will be Patterns with Required, Encouraged,
administered and enforced on behalf of the developer. The and Prohibited elements
roles and responsibilities of the developer, builders and
homeowners and/or homeowners’ association in overall
administration of Comprehensive Development Standards
Manual requirements shall be addressed.
Recommendation of the Planning Staff:
The Planning Staff recommends that the rezoning from IPM (Industrial Park
Manufacturing zone) and A (Agriculture zone) to TND (Traditional Neighborhood Design
zone) be approved. In general, the Master Plan and Master Comprehensive Design Standards
Manual (Pattern Book dated May 6, 2005 with Addendum of June 9, 2005) comply with the
purpose and intent of the Traditional Neighborhood Design zone by presenting a proposal for a
mixed use development with residential, commercial, office, and open space uses.
The Planning Staff finds that the Master Plan submission contains sufficient detail to allow
for the submission of Implementation Plans by district.
Planning Staff offers comments regarding the applicant submission as follows:
Comments of Planning Staff for City and State Code Requirements:
1) Clarify the building format and sizes of Buildings #7 and #8 within the Neighborhood
Commercial District as they appear to exceed the maximum building footprint requirements.
2) Remove proposal for ‘speed table’ at trail crossing of streets (i.e. Ridgley Boulevard). These
items are prohibited by the Dover Code of Ordinances Chapter 7 Fire Prevention and
Protection Section 7-4 Speed Reduction Devices. (Pattern Book page 34). Note: Pattern
Book Addendum of 6/9/2005 item #9 indicates that the speed table(s) will be eliminated.
3) Provide additional information for the Professional Office, Medical, and Financial District
(Section E.12) on the precedents, building design elements, etc. Currently Section E does not
clearly indicate if items E.1-E.11 also refer to the Office District in addition to the
Commercial District.
4) The Master Plan and Master Comprehensive Design Standards Manual will need to be
amended to reflect any changes recommended by the Planning Commission and City Council
included in their approvals.
Comments of Planning Staff as Recommendations to meet Code objectives:
1) The location of Signers Park appears to be somewhat isolated to the rear of a series of
residential parcels. Staff recommends revising the location to provide greater street frontage
for this park.
Página 22
Z-05-03 Lands of Eden Hill Farm: Rezoning to TND and General Overall Master Plan Review
Planning Commission Recommendation Report
Page 10 of 19
2) Staff encourages the incorporation of a greater mix of uses especially in the Commercial
District and the Office District so that residential development is included in these areas as
well.
3) A series of proposed street names where included on the Master Plan to assist in presenting
information on the overall proposal. Initial comments regarding these street names have been
received from the Kent County GIS/Mapping/911 Addressing Section. Approval of this
rezoning application and Master Plan will not finalize the street names for the Eden Hill
Farm development. Additional review and consideration of the street names will follow as
part of the Implementation Plan submissions. The City Planning Staff will work with the
applicant to revise street names as necessary to avoid duplication or confusion with existing
streets in the City of Dover or the immediate vicinity of Kent County.
4) Currently the Master Plan Pattern Book refers to the Dover Zoning Ordinance for the sign
requirements. Staff recommends development of requirements specific to this Traditional
Neighborhood Design project. Note: Pattern Book Addendum of 6/9/2005 item #16 indicates
that the guidelines for signage will be developed during the Implementation Phase of the
project.
Planning Staff Advisory Comments to the Applicant:
1) The applicant shall be aware that approval of the rezoning to the Traditional Neighborhood
Design Zone does not represent final Subdivision or Site Plan approval. The next step in the
application process is the submission and review of the Implementation Plan.
2) The Master Plan and Master Comprehensive Design Standards Manual documents have a
series of editing, grammatical and visual image corrections (spelling, numbering, mislabels,
missing photos, text repeats, etc.) that will need to be corrected. These corrections do not
impact the overall concept and intent of the TND Master Plan. Planning Staff will work with
the applicant to identify and make these corrections.
3) At the present time, the West Dover Connector is a concept and not a street name. Revise
references and labels appearing in the Master Plan and Pattern Book accordingly. We would
anticipate that the road name of Saulsbury Road would continue south of North Street for the
proposed road located parallel to the west property line of the project site.
4) Staff encourages the Residential District to include a mix of unit types within a street block.
The Pattern Book notes that the opportunity is there through the use of the lot modules
established in the plan. The Implementation Plan for this district can provide more examples
of how to accomplish this mix of units.
5) Staff recommends that the Site Elements and Landscape Features include additional
discussion of the concept and intent for these items including lighting, furniture, paving
products, fencing, etc. similar to the approach taken the architectural patterns of building
elements. We would caution the applicant about the naming of specific manufacturers and
products by model number. Note: Pattern Book Addendum of 6/9/2005 items #17, 18, and 19
indicates that the references to manufacturers will be revised to “approved manufactures or
equal.”
Página 23
Z-05-03 Lands of Eden Hill Farm: Rezoning to TND and General Overall Master Plan Review
Planning Commission Recommendation Report
Page 11 of 19
6) Some items identified for clarification in future Implementation Plan submissions:
a) Identify the dedication intention for the public streets to the State of Delaware and/or to
the City of Dover and also finalize street names
b) Identify the public streets and private circulation systems (i.e. parking lot, drive aisles)
within Neighborhood Commercial district and Professional Office district
c) Provide the Phasing of each development district and associated elements such as street
network, building sites, parking areas, stormwater management and open space
d) Explain the elements of the residential lot layout i.e. buildable area, setbacks, porch zone,
etc.
e) Identify the Ownership and maintenance of the Open Space areas (active and passive
open space areas) and the Community Center
f) Responsibility for Landscape Plantings including those tree plantings in right-of-ways,
open spaces, etc.
g) Clarify the Administration of the Design Elements including the associated
responsibilities and procedures. One section includes references to an ARB
(Architectural Review Board). (Pattern Book- Section F2 and F4 and Note: Pattern Book
Addendum of 6/9/2005 item #15 indicates that this reference will be revised).
Public Comments:
The application was represented by the project engineer Mr. Gregg Moore, Becker Morgan
Group and owner Deb Scheller, Eden Hill Farms, Inc. It is also noted that other members of the
development team were present in the audience at the meeting. Mr. Moore shared a PowerPoint
presentation of the residential, commercial, and office areas including three-dimensional
animations of example streets in each district.
The following individuals appeared and spoke in regards to the rezoning application. (See the
Draft Planning Commission Meeting Minutes for additional information.)
• Carol Jason, 833 North Street: She was concerned with access locations and traffic along
North Street and the potential views of back of buildings.
• Sandy Kinkus, 365 Fiddlers Green: She was concerned about the impact to the existing
neighborhood, stormwater management as related to the Puncheon Run, accessibility of
parks, and street widths for fire trucks.
• Janice Sibbald, 144 Blue Beach Drive: She commented on the beautiful plan but is
concerned that the connection from existing neighborhoods to Schutte Park was not
shown on plan. She also had questions on the community center and park area parking
locations.
• Cheryl Precourt, 260 Kesselring Avenue: She commented on it as a great idea; however,
she is concerned with the West Dover Connector issue and potential increase in traffic.
Agency Comments from DAC Report:
• Department of Public Works has no objection to the proposed rezoning. The Department
provided several advisory comments regarding design of the future development as related to
landscaping, streets, and utilities.
Página 24
Z-05-03 Lands of Eden Hill Farm: Rezoning to TND and General Overall Master Plan Review
Planning Commission Recommendation Report
Page 12 of 19
• The Dover Office of the Fire Marshal provided comments regarding fire protection measures
necessary for the development’s design and construction activities.
• The City Electric Department has no objections to rezoning.
• DelDOT has no objection to the rezoning. They provided advisory comments related to
traffic analysis.
• The Kent Conservation District has no objection to rezoning. They provided advisory
comments regarding stormwater management planning and drainage for future development.
• The Kent County GIS/Mapping/911 Addressing Division provided initial comments
regarding the proposed street names.
Attachments to the Report:
• Development Advisory Committee Application Review Commentary (comment sheets)
from the following:
Department of Public Works
Dover Office of the Fire Marshal
City Electric Department
Delaware Department of Transportation (DelDOT)
Kent Conservation District
Kent County GIS/Mapping/ 911 Addressing Division
• Comprehensive Plan Update 2003, excerpt from Chapter 11: Land Development Plan
• Pattern Book Addendum Letter dated June 9, 2005
• Development Team Summary
• Narrative of Applicants Interest
• PLUS Review Comment Letter from Office of State Planning Coordination, dated
January 7, 2005
• PLUS Comment Response Letter from applicant, dated June 6, 2005
• General Overall Master Plan Review materials. (Due to project size and scope these
materials are provided by hard copy only.):
• Parcel Plan Sheet
• Master Plan Sheet (in color)
• Master Comprehensive Development Standards Manual (Pattern Book)
The complete application submission is available for review at the Department of Planning &
Inspections and will be display at the City Council meeting.
Página 25
C
C
CITY OF DOVER I P
T U
DEVELOPMENT ADVISORY COMMITTEE Y B
L
APPLICATION REVIEW COMMENTARY O I
F C
STAFF D.A.C. MEETING DATE: June 2, 2005
D W
==================================================================== O O
V R
APPLICATION: Lands of Eden Hill Farm, Inc. @ 834 W. North Street E K
R S
FILE#: Z-05-03 REVIEWING AGENCY: City of Dover Public Works
CONTACT PERSON: Scott Koenig or Andrew Riggi PHONE#: 736-7025
=====================================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN
IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Our office has no objection to the proposed re-zoning of the site.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
Although more information than is typically required has been submitted as part of the package for this site, the
information contained within raises various questions and concerns to our department. The following should be
addressed by the applicant prior to the next submission for this site.
1. Landscaping
a. Overall, the plan is well done. We particularly like the wide medians within some of the streets and the
larger areas between the curb and sidewalk which allow for larger canopy trees to grow. The applicant
should note, however, that our office typically requires ten to fifteen feet (10’-15’) of separation between
trees and utilities. The applicant must take into consideration all utilities located within the right-of-way,
should trees be proposed to be located therein, to ensure that there is not an unnecessary disturbance of
services due to root systems.
b. Future plan submissions must designate which public areas are to be maintained by the City. This includes
parks, open space and right-of-ways. The level of landscaping proposed for this site will require the
procurement of additional departmental staff and equipment in order to maintain these areas in order to
ensure that the current level of service provided within the City is not decreased.
c. We strongly recommend that areas to be maintained by the City not contain large mulched areas containing
groundcovers, shrubs or perennials. The Grounds Division of the Department of Public Works is primarily
set up to maintain turf and trees and the City Manager has agreed that our current Beautification Program
has reached its limit in work load. The high maintenance level required of mulched areas would place an
even higher burden on our office.
d. Our office recommends the use of Red Maples (cultivars ‘October Glory’ with lesser ‘Red Sunset’) and
Sugar Maple (cultivars ‘Green Mountain’ with lesser ‘Legacy’) for deciduous canopy trees.
e. Our office discourages the use of Ash trees as they have a high level of pests and other problems. These
Página 26
species should be substituted with ‘Green Vase’ Zelkova or ‘Greenspire’ Littleleaf Linden.
f. Our office highly recommends the use of Oriental Spruce (Picea orientalis) for evergreen trees.
g. Our office discourages the use of Redbud as an ornamental understory tree. We have not had success with
this tree as it is not very hardy. This species should be substituted with the ‘Okame’ Cherry.
h. Our office recommends incorporating Cherry trees into the design. The following selections have done
well in the City: Yoshino, ‘Kwanzan’ and ‘Accolade’. We typically incorporate these trees into most of
our projects citywide in order to meet our long term goals.
2. Streets
a. The plan must clearly designate as to which streets are to be dedicated to the City and which streets are to
be dedicated to the State.
b. The following roads are shown containing curbed planter islands: Type 6 Roads, residential Allee Streets
(Sheet 16 of the Pattern Book) and Type 8 Roads, commercial Main Streets (Sheet 20 of the Pattern Book).
Our office highly discourages the use of these planter islands due to their high tendency to be hit by
passing traffic.
c. On Sheet 19 of the Pattern Book, alleys within the Commercial District are referred to as Type 4. On Sheet
20 of the Pattern Book, alleys within the Commercial District are referred to as Type 9. This conflict must
be resolved prior to the next submission.
d. On Sheet 23 of the Pattern Book, Type 10 Roads within the Professional Office, Medical & Financial
District are shown in plan view as having a two-way traffic pattern but within the description it is noted
that they are to have a one-way traffic pattern. This conflict must be resolved prior to the next submission.
e. On Sheet 25 of the Pattern Book, Type 11 Roads, commercial Connector Roads, are shown in plan view as
having an eight feet (8’) wide planter strip but within the description it is noted that they are to have a ten
feet (10’) wide planting median/island on both sides of the road. This conflict must be resolved prior to the
next submission.
f. All on street parking spaces are to be designed and marked as per the Manual for Uniform Traffic Control
Devices (MUTCD). The MUTCD requires that parking space tick marks be located eight feet (8’) off the
curb, provide a twenty-two to twenty-six feet (22’-26’) long parking space, and be spaced eight feet (8’)
apart.
g. Our office recommends that lighting be incorporated into the alley design within the Residential District.
h. The Townhouse Lot design (Sheets 49 and 50 of the Pattern Book) show a significant amount of paving
within the rear yards. Our office highly recommends that driveway entrances to these units, off the alleys,
be designed with a minimum width of twelve feet (12’) and a maximum width not to exceed fifty percent
(50%) of the lot width for the associated townhouse unit. This requirement will assist in maintaining the
buffer between the alley and the parking area for each lot.
3. The developer is responsible for reimbursement to the City for sewer and water utilities extended to the
property with the DelDOT North Street Improvement Project.
IF YOU HAVE ANY QUESTIONS OR NEED TO DISCUSS ANY OF THE ABOVE COMMENTS, PLEASE CALL THE ABOVE
CONTACT PERSON AND THE PLANNING DEPARTMENT AS SOON AS POSSIBLE.
Página 27
D
O M
CITY OF DOVER V A
E R
DEVELOPMENT ADVISORY COMMITTEE R S
H
APPLICATION REVIEW COMMENTARY F A
I L
D.A.C MEETING DATE: June 9, 2005 R
E
====================================================
APPLICATION: Eden Hill ____________________________________________________
FILE#: Z-05-03 REVIEWING AGENCY: Dover Fire Marshal____________________________
CONTACT PERSON: Dave Truax PHONE#: 736-7011______________________
==========================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS
AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. During construction every building shall be accessible to Fire Department apparatus by way of access
roadways with all weather driving surface of not less than 20 feet of unobstructed width to withstand the
live loads of fire apparatus and having a minimum of 13 feet 6 inches vertical clearance. Dead-end Fire
Department access roads in excess of 150 feet in length shall be provided with approved provisions for the
turning around of Fire Department apparatus.
2. Water supply for fire protection either temporary or permanent shall be made available as soon as
combustible material accumulates. There shall be no delay in the installation of fire protection equipment.
Where underground water mains and hydrants are to be provided, they shall be installed, completed, and in
service prior to construction work.
3. Building permits will not be issued until the area has been inspected for the condition of the roadway and
fire protection water is available.
4. Any gas fired HVAC equipment must be equipped with emergency cut off switches remotely located.
5. Address numbers of at least 4 inches in height must be placed on the street side of each residence.
6. Plan to show hydrants 600 feet on center.
7. More detail needed on each type of building.
8. Site Plan needed for each individual non-single family dwelling.
9. Review with Fire Department overall access to site.
10. Review street width and speed reduction device with Fire Department.
DAC Report
Página 28
Eden Hill
Page 2
RECOMMENDATIONS SUGGESTED FOR AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
NONE
ADVISORY COMMENTS TO THE APPLICANT:
1. After any application has been approved by the Planning Commission, the applicant has a maximum of
thirty (30) days t appeal to the Code Board of Appeals Committee.
2. All comments from this office, approved by the Planning Commission are at the expense of the
owner/applicant.
3. The City of Dover uses the 2003 NFPA Life Safety Code, 2003 International Building Codes, latest
editions of all other International Codes and NFPA Codes and the 2003 Delaware State Fire Prevention
Regulations.
If you have any questions or need to discuss any of the above comments, please call the above contact person and
the Planning Department as soon as possible.
Página 29
DD
O E
CITY OF DOVER V L
DEVELOPMENT ADVISORY COMMITTEE MEETING E E
APPLICATION REVIEW COMMENTARY R C
T
JUNE 2, 2005 - 10:00 A.M. - CAUCUS ROOM R
I
C
APPLICATION: LANDS OF EDEN HILL FARM, INC. - 834 WEST NORTH STREET
FILE NO.: Z-05-3 REVIEWING AGENCY: CITY OF DOVER ELECTRIC
CONTACT PERSON: STEPHEN A. ENSS PHONE #: 736-7091
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY'S AUTHORITY
AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE
ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
The Electric Department reviewed the plans for rezoning and has no objections. The Electric Department will offer
comments during the Planned Neighborhood phase of the project.
RECOMMENDATIONS SUGGESTED FOR AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
If you should have any questions or need to discuss any of the above comments, please contact Stephen Enss at 736-7091 or
contact the Planning Department at 736-7010 as soon as possible.
Página 30
CITY OF DOVER
D
DEVELOPMENT ADVISORY COMMITTEE
E
APPLICATION REVIEW COMMENTARY L
D
D.A.C. MEETING DATE: June 2, 2005 O
T
======================================================
APPLICATION: Lands of Eden Hill Farm, Inc.
FILE#: Z-05-03 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Richard A. Woodhall PHONE#: 760-2262
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS
AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
We have no objection to the rezoning.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
DelDOT fully supports the concept plan but will require a traffic analysis or TIS at the subdivision level.
If you have any questions or need to discuss any of the above comments, please call the above contact
person and the planning department as soon as possible.
Página 31
K
CITY OF DOVER E C
N O D
DEVELOPMENT ADVISORY COMMITTEE T N I
APPLICATION REVIEW COMMENTARY S S
D.A.C. MEETING DATE: May 26, 2005 E T
R R
V I
APPLICATION: Eden Hill Farm A C
FILE #: Z-05-03 REVIEWING AGENCY: Kent Conservation District T T
I
CONTACT PERSON: Jared C. Adkins, P.E. PHONE #: 741-2600 ext.3 O
N
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED
BY THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. The Kent Conservation District has no objection to the rezoning of this site.
ADVISORY COMMENTS TO THE APPLICANT:
The Following comments are advisory and apply to the development of a detailed site plan for this
project.
1. As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management
plan must be reviewed and approved by our office prior to any land disturbing activity (i.e. clearing, grubbing,
filling, grading, etc.) taking place.
2. This project outfalls to both the Puncheon Run and the Tar Ditch drainage systems which both have a
well documented history of flooding downstream from this site. A downstream drainage study will be
required for this project to determine the impacts of the site development on those systems. Stormwater
management requirements for this site will be based on the results of the drainage study and may involve
over-managing the stormwater discharges from this site in order to minimize downstream flooding.
3. It appears that the existing stormwater facility near the northeast corner of the project is to be expanded.
Since this facility was constructed by DelDOT, confirmation will be requested that DelDOT will allow
this project to utilize that facility and clarification of who will be responsible for its maintenance.
4. The preferred methods of stormwater management are those practices that maximize the use of the natural
features of a site, promote recharge and minimize the reliance on structural components.
5. It is recommended that the stormwater management areas be incorporated into the overall landscape plan to
enhance water quality and to make the stormwater facility an attractive community amenity.
6. A letter of no objection to recordation will be provided once the detailed Sediment and Stormwater
Management plan has been approved.
7. Based on the site characteristics, a pre-application meeting will be required to discuss stormwater management
and drainage for this site.
Página 34
City of Dover Comprehensive Plan Chapter 11 Land Development Plan
are also recommended in areas immediately adjacent to existing low-density residential
neighborhoods for reasons of compatibility.
Recommendation for Medium Density Residential
Medium density residential land uses involve a maximum gross density of eight (8) dwelling
units per acre. This type of development may include single family houses on smaller lots,
duplexes and townhouses. Apartments may be permitted if approved through the Planned
Neighborhood Design option. Mobile home park developments would also be considered
medium density. Medium density residential uses are permitted in the following zoning districts:
R-8 (Single Family Residential), R-7 (Single Family Residential), RM-1 (Medium Density
Residential), and MHP (Mobile Home Park).
The Comprehensive Land Development Plan recommends that medium density residential uses
be permitted in close proximity to existing and planned service and employment centers and in
locations well supported by transportation infrastructure and mass transit services.
Recommendation for High Density Residential
High Density Residential land uses involve a gross density of 8 or more dwelling units per acre
and may include high rise, mid-rise or garden apartments, and townhouse developments.
Duplexes and single family homes are also permitted in mixed-use developments. The following
Zoning Districts permit high density residential development: RG-1 (General Residence), RG-2
(General Residence), RG-3 (Group Housing), RG-4 (Multi-Story Apartments), RG-5 (Mid-Rise
Apartments), and RM-2 (Medium Density Residential - note: the name of this zone was
proposed to be changed in the implementation of the 1996 Plan to reflect High Density).
The Comprehensive Land Development Plan recommends that high density residential be
dispersed throughout the City along arterial roadways in close proximity to other high-density
residential uses, schools, neighborhood commercial areas and other compatible non-residential
land use areas. Although very few vacant developable acres have been designated for high-
density residential use, housing types usually associated with higher density zones may be
accommodated through the Planned Neighborhood Design option.
Participants in the 1996 community planning workshops generally viewed high-density
residential development as less desirable. However, analysis of population and employment
projections and trends in the local housing market indicate that there will be continued demand
for high-density development.
Mixed Use Areas
The 1996 Plan noted the land use of Downtown Mixed Use. This category has been renamed
Mixed Use since other areas of the City are also appropriate for this type of land use.
Downtown Dover
One Mixed-Use area consists of the Downtown area. The historic City center -- clustered around
The Dover Green -- dates back as early as the 1700s. It expands to also include the traditional
City pattern of grid streets, which developed during the 19th and early 20th centuries. As a
result of its earlier development, Downtown Dover like many other historic cities includes a
variety of intermingled land uses. The area is bounded by Wesley College on the north, the
The Dover Plan 2003 Update September 2003
- Page 132 -
Página 35
City of Dover Comprehensive Plan Chapter 11 Land Development Plan
railroad tracks on the west, Water Street on the south and St. Jones River on the east. It includes
residential, commercial, office, cultural and institutional uses.
Assumptions: Downtown Dover
1. Downtown Dover is the traditional and symbolic center of the community and is vitally
important to the overall image and identity of the City.
2. As the largest area of employment in the City, Downtown Dover is vital to the economy. It
is important to preserve the area as a safe, convenient and aesthetically pleasing environment.
3. Downtown provides a unique residential environment in close proximity to commercial,
cultural, education and employment resources. There is a wide variety of housing types
Downtown.
4. Downtown provides a unique and affordable commercial environment where locally owned
businesses reflect the small town nature of the community.
5. The age of the buildings and infrastructure in the downtown area requires special attention
and incentives to assist in continual use and revitalization activities.
Goal: Downtown Dover
Preserve and enhance the role of Downtown Dover as a major employment, residential and
commercial center as well as the symbolic and cultural heart of the community, and recognize its
unique heritage and historic resources. Provide for mixed use development allowing greatest
variation of uses.
Policies: Downtown Dover
1. Enhance the Downtown area through economic development and historic preservation
programs.
2. Continue to support the preservation of buildings and infrastructure through public
investments, property maintenance enforcement, housing grants and financial incentives.
3. Promote zoning districts and regulations that support the traditional mixed-use nature of the
Downtown area.
A second large area has been designated mixed use – the Eden Hill Farm Property.
Eden Hill Farm
The City of Dover and the State of Delaware share an extraordinary opportunity to shape the
future development of a large tract of land within the community. Eden Hill Farm comprises
265 acres of lands available to market. Found between the Norfolk Southern railroad tracks and
the Kraft General Foods Plant, the property represents a wonderful opportunity to the
development community. Currently, the property is zoned industrially with permitted uses
ranging from manufacturing, researching design laboratories, warehouses, professional and
governmental offices, to retail and services establishments within a planned industrial park.
Certainly, the community can anticipate a rezoning request to provide for more desirable
development known as “mixed use.” – development plans that produce the greatest variety of
land usage. It is rare for a community to find a large tract of land enveloped by urbanization
The Dover Plan 2003 Update September 2003
- Page 133 -
Página 36
City of Dover Comprehensive Plan Chapter 11 Land Development Plan
available to the development community providing for a central theme to be established rather
than tracts of land sold off piecemeal.
The project also represents an opportunity to address some major traffic concerns within the
community through the extension of Saulsbury Road. The connection of Saulsbury Road with
New Burton Road will ease traffic congestion on the North Street corridor. The State of
Delaware in 2002 expressed in their bond legislation the importance of this land and was
committed, “to increase and expedite employment, economic development, transportation,
cultural and recreational opportunities.” It charged appointed officials to pursue a plan that
would make the best use of this property and still protect its character.
It is with that knowledge that the City, the State, and the community need to work cooperatively
to ensure that the development of the Eden Hill Farm is in keeping with Governor Minner’s
Livable Delaware initiative and to ensure that the rich heritage and historic significance of the
property is not diminished. The type of development should provide the same quality of life for
residents in the community that they have enjoyed and the qualities that have attracted residents
in the past.
Goal: Eden Hill Farm and Other Appropriate Areas
1. Encourage creation of neighborhood centers.
2. Within the close knit neighborhood fabric there are opportunities for the creation of
“urban villages” or centers. These centers should be established along major roadways
and feature mixed use development, pedestrian-friendly public environments and
opportunities for connection to future transit.
3. In order to encourage non-automobile access to the center, the activities should be
clustered within a one-half mile radius (or 10-minute walk), and be located so as to draw
upon residents from a number of surrounding neighborhoods.
4. Rezoning of strategic parcels to permit mixed-use.
5. Develop a strategy for accommodating on-street and behind building parking, and the
creation of build-to lines for new development. These strategies will encourage the
creation of well-defined public street spaces and pedestrian-friendly village areas that
encourage walking and bicycle use.
Commercial Land Uses
As a central City, Dover serves as a regional center for commerce and trade within the Delmarva
Peninsula. An integrated transportation system consisting of arterial highways, freight rail
service, and air transport provide for the efficient movement of goods to and from Dover in
support of business development and activities. Dover’s residential neighborhoods also create
various local commercial needs. The Comprehensive Land Development Plan identifies specific
locations for the development of neighborhood retail and community shopping center uses within
the suburban fringe. More intensive regional commercial development is directed toward the US
Route 13/113 corridor close to existing highway commercial and regional shopping center
establishments.
The Dover Plan 2003 Update September 2003
- Page 134 -
Página 37
June 9, 2005
Mr. James Galvin, AICP, Director
City of Dover
Planning/Inspections
P.O. Box 475
Dover, DE 19903-0475
RE: Rezoning Application
EDEN HILL FARM PATTERN BOOK
Dover, Delaware
1999053.04
Dear Mr. Galvin:
On behalf of our clients, Eden Hill Farms, Inc., Dover Medical Properties, L.L.C. and
Investment Properties Associates, L.L.C., we are hereby submitting revisions and
clarifications to the Development Standards Manual (Pattern Book), dated May 6, 2005.
These revisions and clarifications will be inserted into the Pattern Book during the
Implementation phase of the project.
Please except the attached document as a formal document associated and included as part
of the submission.
If you have any questions, do not hesitate to contact me.
Sincerely,
BECKER MORGAN GROUP, INC.
Gregory V. Moore, P.E.
Vice President
GVM/rlh
199905304hp-PB addedum.doc
Página 38
EDEN HILL FARM
RE-ZONING APPLICATION
Lands of Eden Hill Farm
Z-05-03
PATTERN BOOK – ADDENDUM
June 9, 2005
The following revisions and clarifications shall be inserted into the Development
Standards Manual (Pattern Book) dated May 6, 2005. The comments either replace or
clarify information previously provided as follows:
General Comments:
1. All canopy trees listed as 4”–5” shall be changed to read “….planted with up to 4”
caliper canopy trees (16’-18’ ht.).”
2. All sidewalks graphics and text to be changed to 5’ sidewalks.
3. The State will construct the bike path that runs along the railroad tracks within the
100’ buffer. This trail will be 10 feet wide. The remaining bike paths on the
project will be 5 to 6 feet wide. The signage and site amenities along these
portions of the trail, which exists in all other locations throughout the project, will
be less elaborate then those provided along the state bike path.
4. The screening fence indicated on the master plan and in the pattern book shall be
clarified as follows: A 6 ft. fence is planned for between the entry and back of the
grocery store along Wemyss Road, all other fencing shall be 4 ft. high.
5. Graphics throughout the Pattern Book refer to “textured walk with border” for
sidewalks. The intent is to use the textured border in limited locations throughout
the project rather then all sidewalks. Add “….textured walk with border limited to
accent areas only.”
Specific Clarifications and Revisions:
6. Pg. 25 – Type 11 Road – Connector Streets – Graphic indicates a 5’ sidewalk on
both sides. Change the graphic to read 5’ sidewalk on one side only.
7. Pg. 33 – Professional Office Zone – Delete 2nd paragraph in it’s entirety.
8. Pg. 33 – Tree Density – Delete entire section as it does not apply.
9. Pg. 34 - The internal bike path crosses several streets throughout the development.
Pg. 34 indicates a 10’ speed table with decorative paving as a crosswalk. The
speed table is to be eliminated in all locations and the decorative paving is to be
changed to diagonal painted striping.
10. Pg. 38 – Passive Open Space – text reads “Other proposed embellishments include
a water feature and sitting area as the main focal point at the center of the
green…..A colored, textured walkway system, six feet wide, will link together the
various buildings of the professional office complex with other areas of Eden
Hill”. Change to read “Other proposed embellishments include a central icon
feature and sitting area as the main focal point at the center of the gree…..A
colored, textured walkway system will link together the various buildings of the
professional office complex with other areas of Eden Hill. Walkway pattern is
flexible in its extent and location in order to provide more open space”. Graphics
Página 39
indicate a series of crossing and intersecting walkways. Add note to indicate
“Walkway pattern is flexible in its extent and location in order to provide more
open space”.
11. Pg.51 – Condominiums – add a sentence to the last paragraph “The buildings will
have (3) levels of living space. Some units may be (4) storey with 1st floor parking
and 3 storey living units above”.
12. Pg. 70 & 85 – Siding – Prohibited Materials – Delete Diagonal Siding, as diagonal
siding is typically detail in many historic structures especially on dormers.
13. Pg. 70 – Materials-Delete reference to chimneys, as they will be addressed in the
Implementation phase.
14. Pg. 81 – Awnings & Canopies – 2nd paragraph – Change “Canvas, shed-type…” to
read, “ Shed-type awnings of various materials such a canvas, metal, wood, etc
are allowed.”
15. Section F – Site Elements and Landscape Features – delete all references to
“…..are subject to approval by the ARB….” Sentences should read as “…are
subject to approval.”.
16. Pg. 91 – Signage – 3rd paragraph in total - Change “The size of all signs is
regulated by the City of Dover zoning ordinance……” to read “The size, design,
material and location of all signs will be developed as part of the Implementation
phase of the project. The general guidelines that will be used as a model in
developing the Eden Hill Farm signage guidelines are outlined on pgs. 5-5
through 5-8 of “Design Standards and Guidelines for the City of Dover Historic
Zone”. These guidelines refer to a historic application however the general intent
of providing signage that can unify the commercial street while serving to identify
and promote….” as well as “consider the entire façade of the building as the sign”.
17. Pg. 92 – Lighting Standards – references to “Approved manufactures” should be
changed to “ Approved manufactures or equal”. The intent is to establish a level
of quality and not to limit other manufactures of equal quality.
18. Pg. 93 – Site Furnishings - references to “Approved manufactures” should be
changed to “ Approved manufactures or equal”. The intent is to establish a level
of quality and not to limit other manufactures of equal quality.
19. Pg. 95 – Fencing - references to “Approved manufactures” should be changed to “
Approved manufactures or equal”. The intent is to establish a level of quality and
not to limit other manufactures of equal quality.
20. In several locations throughout the Pattern Book, there are spelling and grammar
errors. These corrections will occur in the Implementation phase of the project.
This ends all addendums to the Pattern Book dated May 6, 2005.
199905304hp-PB addedum.doc
Página 40
EDEN HILL FARM
DEVELOPMENT TEAM SUMMARY
RE-ZONING APPLICATION
Lands of Eden Hill Farm
Z-05-03
Eden Hill Farm, Inc. - Comprised of the family, which has owned Eden Hill Farm
for generations, and now consists of the Horsey and Scheller families.
Bob Thomas of Young Conaway Stargatt & Taylor, LLP – Attorney for Eden Hill
Hill Farm, Inc. and Investment Properties Associates, LLC.
State of Delaware – Contract purchaser of the 30.509 acre allee open space and
historic home, and potential purchaser of the 80.128 acre open space on the south
west corner of the project.
Dover Medical Properties, LLC – Contract purchasers of the 25.4725 acre parcel
along North Street title professional office, medical, and financial district.
Mark F. Dunkle, Esq. of Parkowski Guerke & Swayze, PA – Land development
attorney for Dover Medical Properties, LLC.
Investment Properties Associates, LLC – Contract purchasers of the multi use
residential district consisting of 108.95 acres and 15.71 acres for a Neighborhood
Commercial District.
Becker Morgan Group, Inc. – Architects and engineers responsible for the
preparation of the pattern book, master plan, and rezoning submission package.
Marasco & Associates, Inc. – Specialty architects hired by Dover Medical
Properties, LLC for the architecture of their Phase I building.
Landscape Architectural Services, LLC – Landscape architect responsible for
landscape and open space, site amenities, walkways and lighting sections of the
pattern book.
199905304hq-lst.doc
Página 41
EDEN HILL FARM
NARRATIVE OF THE APPLICANTS INTEREST
RE-ZONING APPLICATION
Lands of Eden Hill Farm
Z-05-03
In 2001, the Horsey and Scheller families, which makeup Eden Hill Farm, Inc.,
recognized that Eden Hill Farm was no longer sustainable as an agricultural
operation. The challenge confronting the families was how to realize Eden Hill
Farm’s development potential while preserving as much of its historic character as
possible, most particularly the farmstead and allées, Cedar and Maple Lanes.
Through conversations with the administration of Governor Ruth Ann Miner,
which recognized the opportunity to apply the Governor’s “Livable Delaware”
principles to the development of Eden Hill Farm, the Scheller and Horsey families
receive the support and assistance in there initiative. Under the auspices of The
Honorable Nathan Hayward III, Secretary of the Delaware Department of
Transportation, the State organized an “Eden Hill Farm Working Group”
comprised of representatives of the Horsey and Scheller families, the City of
Dover, Kent County, the General Assembly and other State agencies. The Group
met six times over nine months to fashion a statement of desired objectives. The
Group consensus was that a development embodying the principles of Traditional
Neighborhood Design would best realize those objectives.
In January 2003, the state, acting through its Department of Transportation and the
Scheller and Horsey families, entered into a letter of intent setting forth their
shared objectives to promote the development of Eden Hill Farm in a manner that
would preserve the historic farmstead; provide for green space; encourage bicycle,
pedestrian and transit alternatives to automobile traffic; and employ the most
successful principles and practices of Traditional Neighborhood Design
communities. This cooperation was eventually to lead to the state purchasing
some 95 acres, including the historic homestead and allées, and the families
donating to the state a further 28 acres. Over 40% of Eden Hill Farm’s 272 acres
will thus be preserved in perpetuity for green space and public recreational
activities.
Investment Properties Associates has entered into an agreement with the owners to
purchase approximately 108.94 acres in order to develop a mixed-use residential
traditional neighborhood. The parcel will include approximately 665 units of
single family, duplex, town home and condominium units. The proposed use also
calls for approximately 598,006 square feet (13.73 acres) of ponds, parks and
squares, boulevards and walking trails, which supports the “Livable Delaware”
initiative, Principle 3 – Build Livable Communities. It also supports the principle
of traditional neighborhood design through street pattern design that mimics the
general design of the street pattern in many older communities and creates
Página 42
streetscapes which are human in scale and create a relationship between the
homes, streets and open space.
Investment Properties Associates has also entered into an agreement with the
owners to purchase 15.71 acres in order to develop a mixed-use commercial
neighborhood. The parcel will include approximately nine buildings totaling
approximately 217,200 square feet. It proposes to have retail use on the first floor
and office and/or residential use on the second floor. The proposed use also calls
for approximately 30,313 of boulevards and has a high density of concentrated
buildings. It supports the principle of traditional neighborhood design through
street pattern design that mimics the general design of the street pattern in many
older communities and creates streetscapes which are human in scale and create a
relationship between the buildings, streets and open space. The sidewalks along
“main street” will be wider then traditional sidewalks to provide and encourage
outdoor dining and community activity.
Dover Medical Properties, LLC, has entered into an agreement with the owners to
purchase 25.47 acres in order to develop a mixed-use professional office, medical,
and financial neighborhood. The parcel will include approximately nine buildings
totaling approximately 398,250 665 square feet. The proposed use also calls for
approximately 87,409 square feet of open space, which supports the “Livable
Delaware” initiative, Principle 3 – Build Livable Communities. The plan divides
the land into sections, which are intended to mimic Legislative Mall on the east-
west axis and Lookerman Street on the north-south axis. The parking would be
limited to small sections around the buildings and divided into two small sections
in the center of the parcel, which would be further divided by landscape islands.
The design also supports the principle of traditional neighborhood design through
street pattern design that mimics the general design of the street patterns for
commercial/businesses in many older communities and creates streetscapes which
are human in scale and create a relationship between the buildings, streets, parking
and open space.
The combined efforts of the Horsey and Scheller families, the State of Delaware,
the City of Dover, Kent County, the General Assembly, Investment Properties
Associates, Dover Medical Properties and numerous State agencies has lead to
proposal that is keeping with “The Land Development Plan” updated 2003, which
shows this area as “Mixed Use” and includes information on the Eden Hill Farm
property specifically. The plan creates a neighborhood center with mixed-use
development, pedestrian friendly public environment, opportunity for connections
to mass transit and an overall master plan
199905304hr-narrative.doc
Página 43
January 7, 2005
Mr. Gregory V. Moore, P.E.
Becker Morgan Group, Inc.
738 S. Governors Avenue
Dover, DE 19904
RE: PLUS review – PLUS 2004-12-07 Eden Hill Farms
Dear Mr. Moore,
Thank you for meeting with State agency planners on December 22, 2004 to discuss the
proposed plans for the rezoning of Eden Hill Farms from IP/Ag to TND in the City of
Dover.
According to the information received, the developers are seeking approval for a 620-unit
mixed-use development between West North Street and New Burton Road on the west
side of Dover.
Please note that changes to the plan, other than those suggested in this letter, may result
in additional comments from the State. Additionally, these comments reflect only issues
that are the responsibility of the agencies represented in the PLUS review. The
developers will need to comply with any Federal, County and local regulations regarding
this property. As the City of Dover is the governing authority over this land, the
developers will need to comply with any and all regulations/restrictions set forth by the
City.
This office has received the following comments from State agencies:
Office of State Planning Coordination – Contact David Edgell 739-3090
This project is located in Investment Level 1according to the 2004 State Strategies for
Policies and Spending. This site is also located in the City of Dover. Investment Level 1
reflects areas that are already developed in an urban or suburban fashion, where
infrastructure is existing or readily available, and where future redevelopment or infill
projects are expected and encouraged by State policy. This project is a mixed use project
providing commercial, office, residential and open space uses. Our office supports
mixed use infill projects as essential to the Livable Delaware strategy of
concentrating growth in and around existing communities and infrastructure. This
Página 44
PLUS
January 7, 2005
Page 2 of 17
is the type of project that is highly desirable to allow us to meet our goals of revitalizing
our already urbanized areas while protecting agricultural lands and natural resource areas
from encroachment by sprawling suburban and rural development. Our office has no
objections to the proposed rezoning and development of this project in accordance with
the relevant City codes and ordinances.
In addition, we would like to commend the property owners, developers, and project
designers for working collaboratively with the State to instill this project with an
exceptionally high level of urban design quality and open space preservation. There have
been many months of discussions between and amongst these parties, and the result is
truly a project which we are sure will fit well into its immediate surroundings, the
available and future infrastructure, and the fabric of the City as a whole.
We are particularly encouraged that the owners and applicants have chosen to develop a
“Traditional Neighborhood Design”. For the most part, this development appears to be
consistent with the principals of “Traditional Neighborhood Design” (which is also
known as “New Urbanism” by some planners and architects). Portions of this
development embody all six of the guiding principals found in our publication titled
Better Models for Development in Delaware:
Principle 1. Conserve Farmland, Open Space, and Scenic Resources: This plan has a
significant and noteworthy open space component. The important historic farmstead and
“tree alleys” were preserved. Too often open space is an afterthought – here you have
made it a guiding principle in the design of the project, and chosen to integrate open
spaces that relate to the historical use of the property as a farm. These open spaces will
be valuable features for residents, employees, and the larger City of Dover community.
The large park area in the southwestern corner of the site will have a great benefit for
regional recreation.
Principle 2. Maintain a Clear Edge Between the Town and Countryside: This
chapter of Better Models talks about the importance of growing through infill and
redevelopment, rather than sprawling outward and impacting farmland and open space.
This principle is addressed through the project’s location as an infill parcel. This project
will provide a range of residences, jobs, commercial, and professional services close to
Dover’s downtown, rather than on a greenfield site on the edge of town or in a rural area.
Principle 3. Build Livable Communities: The term “livable communities” can mean
many things to many people. We are impressed that the owners, developers, and
designers have incorporated so many different aspects of community life into this mixed
use plan. Most new developments we see through PLUS contain homes and some
component of open space. New residents are compelled to drive to work, to shop, to go
to restaurants, and even to go to a park. This development provides not only homes but
extensive open space, preserved historic sites, commercial services and medical and
office uses. It is truly a live-work community that can meet a range of needs for future
residents and employees alike.
Página 45
PLUS
January 7, 2005
Page 3 of 17
Principle 4. Preserve Historic Resources: The owners, designers, and developers
thought of preservation first and protected the historic structures, tree alleys and open
space on the site.
Principle 5. Respect Local Character in New Construction: The choice of the
“Traditional Neighborhood Design” style of development has resulted in a traditionally
designed street pattern that mimics the general design of the street pattern in many older
communities, Dover included. While we have not seen nor reviewed any conceptual
architectural drawings for the buildings we understand that the City of Dover’s ordinance
does compel the applicants to link the architectural design to historic precedents in Dover
and the region.
Principle 6. Reduce the Impact of the Car: One of the basic tenets of Traditional
Neighborhood Design is to design developments for people first by creating human scale
streetscapes. There is no denying that the automobile has transformed our culture in the
last 50 – 60 years, and the best Traditional Neighborhood Design projects balance the
design goals of creating the human scale streetscape with the reality and necessity of
accommodating automobiles. The relationship between the buildings and the streets and
open spaces is very important in creating the “public rooms” and “public spaces” that
define all of our great cities and towns. This plan is largely successful in this regard.
With the notable exception of the medical office complex, the buildings are oriented to
the streets, and parking is available on the street, behind commercial buildings, in alleys
or on individual lots. The streets also appear to be very pedestrian friendly, and there are
a network of trails and paths linking the different components of the development which
will provide residents and employees the option of walking for recreation or to get to the
different uses on the site.
As noted above in Principle 6, the one disappointing aspect of this plan is the medical
complex. The design, as presented, does not appear to be consistent with the overall
“Traditional Neighborhood Design” design philosophy in the following regards:
1. No Mixed Uses: This district appears to be a single use district for medical
offices. The design and marketability of the project could probably be enhanced
by integrating other uses into this complex. Residential uses, such as condo or
apartment units, or perhaps a residential and nursing facility for the elderly might
be good matches. Small scale commercial uses that serve the medical complex
(snack bars, gift shops, etc.) would also probably work well in this portion of the
plan.
2. The Buildings Do Not Contribute to Urban Form: As designed, the
buildings are completely surrounded by parking. This design has more in
common with a typical suburban mall than it does with a Traditional
Neighborhood Design design. One of the basic principles of Traditional
Neighborhood Design is that the buildings should frame streets (to create
Página 46
PLUS
January 7, 2005
Page 4 of 17
streetscapes) and open spaces (to create three dimensional public spaces).
Parking is essential to any urban or suburban use, but the best Traditional
Neighborhood Design projects balance this by designing buildings that hide the
parking in internal blocks, place it on the streets, integrate parking structures, or a
combination of all three. The appearance, function, and success of this
component of the plan could be enhanced by revisiting the basic design of the
buildings as they relate to the streets and open spaces. The goal should be to
reduce the visual impact of the parking while using buildings to enhance the
urban form of streets and open spaces.
3. An Excessive Amount of Parking: We have not done any detailed
calculations, but it does appear that the amount of parking proposed is more
typical of a suburban mall than a mixed use, infill project. The parking
calculations typically used for suburban commercial and office uses tend to
assume a “worst case scenario” of full occupation of the use at all times, and that
there are no alternatives to driving to the site. This project is accessible to transit,
and will be connected to other neighborhoods and employment sites through a
pedestrian network. The mixed use nature of the project may also decrease single
occupant vehicle trips and provide for joint use parking. We ask the applicants to
reconsider the total amount of parking provided. Other project goals, such as
providing parking near the building entrance for patients, could be met by
reserving certain spaces or instituting other parking restrictions rather than by
providing an excessive amount of parking. This is an extremely valuable piece of
property. It would be a shame to not take advantage of opportunities to maximize
its use in order to provide extra parking for vehicles that will rarely be used.
To summarize, our office commends the applicants, owners, designers, and developers
for proposing a very innovative and creative mixed use project on an important infill
parcel in Dover. This project combines elements of all six “Design Principles”
encouraged by Better Models for Development in Delaware into a very attractive and
viable project for the City of Dover. We do ask that the designers and applicants
consider making some design changes to the medical complex in order to ensure that it is
consistent with the high level of design quality exhibited by the rest of the development
proposal. Please note below that the State Historic Preservation Office has some more
detailed design comments for the project that are intended to improve the integration of
the new development with the historic resources on the site. Please consider these design
comments as well.
Our office has no objections to the rezoning and development of this project in
accordance with all of the relevant City codes and ordinances. In addition, we would like
to extend an invitation to the designers and developers of the medical office plan
component to meet with us to discuss design alternatives. Our office will be able to
provide examples of other successful “Traditional Neighborhood Designs” and provide
design assistance based on the concepts found in Better Models for Development in
Delaware.
Página 47
PLUS
January 7, 2005
Page 5 of 17
State Historic Preservation Office (SHPO) – Contact Anne McCleave 739-5685
Eden Hill is listed in the National Register of Historic Places because of its contribution
to agriculture, its association with significant people (Nicholas Ridgley), its architecture,
and its potential to yield information (historic information illustrated in the initial
construction and subsequent additions and alterations of the house). The property retains
its historic integrity, including location, setting, design, feeling, workmanship, and
association. The property’s history and its visual representation and continuity of that
history are important characteristics of the property.
It is good to see that the proposed plan includes retention of the house and outbuildings,
and some historic landscape features, such as the historic entrances to the property.
Nevertheless, the proposed development represented in the Master Plan would have an
adverse effect on the historic property. We feel the design of the Master Plan could be
more sensitive to the historic property. A large block of preserved open space around the
historic buildings, rather than the “strips” of open space shown in the Master Plan, would
have been more ideal.
As proposed, the development is too densely located around the historic buildings,
resulting in diminishment of the historic property’s integrity of setting, feeling, and
association. We appreciate the attempt to develop a Traditional Neighborhood
Development design and feel the design is successful in the residential section of the
property; however, we feel the design is unsuccessful with the medical and commercial
complexes on the northern part of the development. We suggest the following changes to
the plan:
1) The Medical Complex turns in on itself and becomes an isolated component of
the development instead of being part of the Traditional Neighborhood.
2) Reduce amount of parking spaces.
3) Move some of the three story condominiums to the south portion of the Medical
Complex, which could help the complex become part of the Traditional
Neighborhood.
4) Move the condominiums immediately south of the Allee and open space to the
north side of The Allee.
a. Currently, the design of the Allee includes residential/condominiums on
the south side and a landscape buffer, backs of medical buildings, and
parking on the north side. Moving some of the condominiums to the north
side of the Allee enhances the streetscape and Traditional appearance.
b. As stated above, this would help tie the medical office complex into the
development; and
Página 48
PLUS
January 7, 2005
Page 6 of 17
c. Allow for more open space within the condominium section, minimizing
the density of the condominiums and minimizing the effect on the historic
buildings.
5) The Commercial Complex, located on the northwest corner, affects the historic
property, specifically the proposed grocery store located immediately adjacent to
the historic buildings.
a. The size and massing of the grocery store is not compatible with the
historic buildings.
b. The grocery store use would require truck access to the back of the
building, which abuts the historic property, and debris and other
equipment resulting from the grocery store use will find its way onto the
historic property.
c. If it is necessary for a grocery store or big box building to be located on
this property, we suggest locating with the retail/office buildings.
d. Locating the grocery store away from the historic buildings and the
“traditional main street” closer to the historic buildings provides a more
traditional and compatible use and design.
6) Remove the proposed road between the historic buildings and the “future public
use” building and remove the road connecting the Medical Complex to the
Commercial Complex.
a. This will provide a unity to the open space; and
b. Provide a better connection between the “future public use” building and
the historic buildings.
7) There are Native American archaeological sites on the south part of the Master
Plan and a high probability for historic archaeological sites in the area
surrounding the house and the hedgerows. The potential historic sites are
associated with the house and past outbuildings.
a. We recommend the developers and DelDOT hire an archaeological
consultant to provide a Phase I survey of their respective properties
(SHPO can provide a scope of work).
8) The arc road connection on the western side of the Allee separates the open space.
This road connection should be designed and landscaped to blend in as much as
possible and to contain a pedestrian connection or crosswalk to connect the two
sides of the open space. Parking should be restricted in the arc to limit the visual
impact cars would have on the continuity of the historic open space.
9) Road widths should be consistent with traditional town street widths.
10) Make sure the construction is high quality throughout the development.
Furthermore, new construction, while keeping with the traditional town feel,
Página 49
PLUS
January 7, 2005
Page 7 of 17
should be compatible with the historic buildings in scale, materials and
workmanship.
11) As the development is designed, we are confident that the landscaping will be
appropriate for a Traditional Neighborhood Development. Please keep in mind
that the historic landscape of this property is the open space. Planting additional
landscape features along the edges of the open space may work to buffer the new
developments from the historic property. However, a large amount of buffering
would be unnecessary if the design of the new development is sensitive to the
historic property.
12) As the use of the historic buildings may change, SHPO can provide assistance to
DelDOT and other parties involved in determining future uses and rehabilitation
and preservation of the buildings. SHPO would also like to assist with any new
construction in the public areas as it relates to compatibility, design, siting, etc.
This includes the “future use public building” indicated on the plan.
The historic complex is the attraction of the property. The design of the plan should focus
on the property’s historic attraction and not hide it from view by locating the dense
development so close to the historic buildings and along the outer streets. The design of
the development should illustrate the open space that has always been historically
associated with the property. A better open space design would preserve the property’s
integrity. We hope the developers use the historic property to their advantage and take
our suggestions into consideration.
Department of Transportation – Contact: Bill Brockenbrough 760-2109
Daniel & Deborah Scheller seek to develop an approximately 272-acre assemblage of
parcels (Tax Parcels ED-05-076.00-01-13.00-000, ED-05-076.00-01-14.00-000, ED-05-
076.00-01-14.01-000) on the south side of West North Street (Kent Road 73) and the
west side of the Norfolk Southern railroad tracks in the City of Dover. The development
would be neo-traditional in design and would include 620 dwellings of various types,
134,400 square feet of commercial uses, a 280,000 square foot medical complex and a
seasonal farmer’s market pavilion. The land is zoned IP/Ag (Industrial Park and
Agriculture) and a rezoning to TND (Traditional Neighborhood Design) would be needed
for the proposed development to proceed.
Our comments are as follows:
1) DelDOT has been an active participant in the development of the concept plan for
this project and has spent over $2,400,000, appropriated through three different
Bond Bills, for planning and acquiring the 28 acres including the farmstead. We
fully support the proposed rezoning. We wish to continue working with the
design team for both the medical complex and the residential development to
arrive at the best arrangement of building sites and streets, in the interest of safety
and efficiency.
Página 50
PLUS
January 7, 2005
Page 8 of 17
2) We are interested in reconnecting Eden Hill Farm to Water Street for the purpose
of providing good access to the medical complex and the townhouse and
condominium uses. However, making this connection across the Norfolk
Southern railroad tracks at grade will require the closure of an existing grade
crossing in another location. We are working with Norfolk Southern to
accomplish that. If we are unsuccessful in that regard, legislation will be
necessary to permit the creation of a new grade crossing at Water Street.
3) The road that is shown on the Master Plan as “Salisbury Rd.” would be an
extension of Saulsbury Road (Kent Road 156). DelDOT has a project, known as
the West Dover Connector (WDC), which could extend Saulsbury Road from its
intersection with West North Street to an as yet undetermined point on New
Burton Road (Kent Road 190). Accordingly, since this road may become part of
Saulsbury Road, it should be designed and built to State standards. Presently we
do not have a typical section that we would use in extending Saulsbury Road, but
we expect to develop one for planning purposes in 2005. In planning the
development, we recommend that a 150-foot right-of-way be set aside for
Salisbury Road. Any typical section that we are likely to develop would fit within
that width. If the developer is ready to proceed with the first phase of
development before the appropriate road section has been determined we will
work with the developer on a suitable alternative or temporary access
arrangement so the project is not delayed. Regarding the alignment of the WDC,
thus far we have developed several concepts. We are not referring to them as
“alternatives” because “alternative” is a defined term in the National
Environmental Policy Act (NEPA) process and we are only just beginning that
process. As mentioned at the PLUS meeting, all of the concepts that involve
extending Saulsbury Road follow the proposed Salisbury Road south to the
proposed roundabout and depart from there. As also mentioned, some of those
concepts would extend the road through the proposed development. It is also
possible that the stormwater management pond may need to be moved, as
alternative alignments receive further study as part of the NEPA process
(preparation of either an Environmental Impact Statement (EIS) or an
Environmental Assessment (EA)). Depending on that outcome, we may then be
able to change that recommendation. We expect to complete the NEPA process
and arrive at a determination in 2006. DelDOT’s preference is that the developers
delay the platting of this area until the alternatives have been selected. However,
we are aware that the developer must show a conceptual master plan for this site
in order to apply for the rezoning at the City. Any plan that is presented to the
City for this section should contain the caveat that the area south of the round
about may need to be redesigned or re-platted based on the desired alternatives
selected through the WDC study process. The project should also be phased so
that the area south of the roundabout is in a later phase of construction. More
information about the WDC project is available at www.DelDOT.net.
Questions regarding the project may be directed to our project manager, Mr. Jay
Kelley at (302) 760-2365.
Página 51
PLUS
January 7, 2005
Page 9 of 17
4) While not required as part of the City’s approval process, a traffic impact study
(TIS) is important to ensure that the transportation infrastructure needed to
support this development is sized properly. We recognize that the WDC, if it is
built, will significantly change travel patterns in the area of this project and we
take responsibility for having the area road network function well in that event.
However, the developers of Eden Hill Farm want to proceed now and we have not
yet determined what, if any, alignment will be built for the West Dover
Connector. Therefore, at least the initial phases of the development must be
designed, and have sufficient improvements to the existing road network, to
function without the WDC. As part of the engineering studies done for the WDC,
a significant amount of traffic data has been collected. That data is available
from Mr. Kelley and may be used in the TIS. To obtain a scope of work for the
TIS, the developer should have their traffic engineer contact our project engineer,
Mr. Todd Sammons, at (302) 760-2134.
5) The developer’s engineer should contact our project manager for Kent County,
Mr. Brad Herb of Johnson, Mirmiran & Thompson, regarding our requirements
for access. Mr. Herb may be reached at (302) 266-9080.
Delaware Transit Corporation – Contact Catherine Dennis 739-3278
The area is served by DART Routes 102, 113 on North St. and Route 103 on New Burton
Road. DART requests the site plan include sidewalks and wishes to discuss the
possibility of implementing bus stops. Please contact DART Planner Wayne Henderson
at (302) 577-3278 extension 3553.
Department of Natural Resources and Environmental Control – Contact Kevin
Coyle 739-3091
General Comment
This project plan represents what Livable Delaware should be about. The plan preserves
wetlands and forests. It provides ample recreational opportunity and is within an
established metropolitan region.
Soils
According to the Kent County soil survey, Sassafras and Woodstown were mapped in the
immediate vicinity of the proposed construction. Sassafras is well-drained upland soil
that has few limitations for development. Woodstown is a moderately well-drained soil of
low-lying uplands that has moderate limitations for development.
Wetlands
Statewide Wetland Mapping Project (SWMP) maps indicate the presence of palustrine
wetlands.
Site plans show that there will not be direct impacts to these wetlands through
construction activities; however, secondary impacts of construction could be detrimental
to the health of these wetlands and their associated streams. These wetlands are regulated
Página 52
PLUS
January 7, 2005
Page 10 of 17
by the Army Corps of Engineers through Section 404 of the Clean Water Act. In
addition, individual 404 permits and certain Nationwide Permits from the Army Corps of
Engineers also require 401 Water Quality Certification from the DNREC Wetland and
Subaqueous Land Section and Coastal Zone Federal Consistency Certification from the
DNREC Division of Soil and Water Conservation, Delaware Coastal Programs Section.
Each of these certifications represents a separate permitting process. Impacts to streams
and associated riparian wetlands, including road crossings, are regulated by the DNREC
Wetlands and Subaqueous Lands Section, and by the Corps of Engineers.
These wetlands provide water quality benefits, attenuate flooding and provide important
habitat for plants and wildlife. Vegetated buffers of no less than 100 feet should be
employed from the edge of the wetland complex. The developer should note that both
DNREC and Army Corps of Engineers discourage allowing lot lines to contain wetlands
to minimize potential cumulative impacts resulting from unauthorized and/or illegal
activities and disturbances that can be caused by homeowners.
To find out more about permitting requirements, the applicant is encouraged to attend a
Joint Permit Process Meeting. These meetings are held monthly and are attended by
federal and state resource agencies responsible for wetland permitting. Contact Denise
Rawding at (302) 739-4691 to schedule a meeting.
TMDLs
Although Total Maximum Daily Loads (TMDLs) as a “pollution runoff mitigation
strategy” to reduce nutrient loading have not yet been developed for most of the
tributaries or subwatersheds of the Delaware Bay watershed to date, work is continuing
on their development. TMDLs for the St. Jones River subwatershed, of which this parcel
is part, are scheduled for completion in December 2006.
Therefore, until the specified TMDL reductions and pollution control strategies are
adopted, it shall be incumbent upon the developer to employ best available technologies
(BATS) and/or best management practices (BMPs) as “methodological mitigative
strategies” to reduce degradative impacts associated with development.
Water Supply
The project information sheets state water will be provided to the project by the City of
Dover via a central water system. Our records indicate that the project is located within
the public water service area granted to the City of Dover under Certificate of Public
Convenience and Necessity 90-CPCN-07.
Should dewatering points be needed during any phase of construction, a dewatering well
construction permit must be obtained from the Water Supply Section prior to construction
of the well points. In addition, a water allocation permit will be needed if the pumping
rate will exceed 50,000 gallons per day at any time during operation.
Página 53
PLUS
January 7, 2005
Page 11 of 17
All well permit applications must be prepared and signed by licensed water well
contractors, and only licensed well drillers may construct the wells. Please factor in the
necessary time for processing the well permit applications into the construction schedule.
Dewatering well permit applications typically take approximately four weeks to process,
which allows the necessary time for technical review and advertising.
Should you have any questions concerning these comments, please contact Rick Rios at
302-739-3665.
Sediment and Erosion Control/Stormwater Management
Requirements:
1) Land disturbing activities in excess of 5,000 square feet are regulated under the
Delaware Sediment and Stormwater Regulations. A detailed sediment and
stormwater management plan must be reviewed and approved by the Kent
Conservation District prior to any land disturbing activity (i.e. clearing, grubbing,
filling, grading, etc.) taking place. The review fee and a completed Application
for a Detailed Plan are due at the time of plan submittal to the Kent Conservation
District. Construction inspection fees based on developed area and stormwater
facility maintenance inspection fees based on the number of stormwater facilities
are due prior to the start of construction. Please refer to the fee schedule for those
amounts.
2) The following notes must appear on the record plan:
• The Kent Conservation District reserves the right to enter private property for
purposes of periodic site inspection.
• The Kent Conservation District reserves the right to add, delete, or modify any
erosion or sediment control measure, as it deems necessary.
• A clear statement of defined maintenance responsibility for stormwater
management facilities must be provided on the Record Plan.
3) Ease of maintenance must be considered as a site design component and a
maintenance set aside area for disposal of sediments removed from the basins
during the course of regular maintenance must be shown on the Record Plan for
the subdivision.
4) All drainage ways and storm drains should be contained within drainage
easements and clearly shown on the plan to be recorded by the City of Dover.
5) A soils investigation supporting the stormwater management facility design is
required to determine impacts of the seasonal high groundwater level and soils for
any basin design.
Comments:
1) This project outfalls to both the Puncheon Run and the Tar Ditch drainage
systems which both have a well documented history of flooding downstream from
this site. A downstream drainage study will be required for this project to
determine the impacts of the site development on those systems. Stormwater
management requirements for this site will be based on the results of the drainage
study and may involve over-managing the stormwater discharges from this site in
Página 54
PLUS
January 7, 2005
Page 12 of 17
order to minimize downstream flooding. Groundwater recharge is encouraged,
however, without proper construction techniques and effective maintenance,
infiltration practices have a high failure rate. Any infiltration practice must meet
the minimum requirements for infiltration design and be constructed in strict
accordance with the approved plan.
2) It appears that the existing stormwater facility near the northeast corner of the
project is to be expanded. Since this facility was constructed by DelDOT,
confirmation will be requested that DelDOT will allow this project to utilize that
facility and who is responsible for its maintenance.
3) It is recommended that the stormwater management areas be incorporated into the
overall landscape plan to enhance water quality and to make the stormwater
facility an attractive community amenity.
4) A letter of no objection to recordation will be provided once the detailed
Sediment and Stormwater Management plan has been approved.
5) Proper drainage of developed lots and active open space should be considered in
the development of the grading plan for this subdivision.
6) Based on the site characteristics, a pre-application meeting is suggested to discuss
stormwater management and drainage for this site.
Drainage
The Drainage Section is aware of existing drainage problems on Puncheon Run,
downstream of this project. The Drainage Section requests the volume of stormwater
released offsite match existing pre-construction volume, and that stormwater infiltration
practices be utilized on this project.
The Drainage Section further requests that all precautions be taken to ensure the project
does not hinder any off site drainage upstream of the project or create any off site
drainage problems downstream by the release of on site stormwater.
Floodplains
A small portion of the site is within the 100-year floodplain. Development should be
limited to areas outside of the floodplain
Forests
According to 2002 aerial photos, forested areas are found in the southwestern portion of
the parcel and along a strip in the northeastern portion. The developer is strongly
encouraged to preserve, and where possible, enhance forested resources on site. The
forested areas on-site should be viewed as a community asset and managed appropriately.
Forested areas on-site set aside for conservation purposes should be placed into a
permanent conservation easement or other binding protection. These areas should be
clearly marked and delineated so that residents understand their importance and so that
homeowner activities do not infringe upon these areas.
Página 55
PLUS
January 7, 2005
Page 13 of 17
Open Space
PLUS materials indicate that 115 acres of open space is proposed for this parcel.
In areas set aside for passive open space, the developer is encouraged to consider
establishment of additional forested areas or meadow-type grasses. Once established,
these ecosystems provide increased water infiltration into groundwater, decreased run-off
into surface water, air quality improvements, and require much less maintenance than
traditional turf grass, an important consideration if a homeowners association will take
over responsibility for maintenance of community open spaces.
Open space containing forest and/or wetlands should be placed into a permanent
conservation easement or other permanent protection mechanism. Conservation areas
should also be demarked to avoid infringement by homeowners.
Stormwater Ponds, Buffers, and Nuisance Species
The stormwater management ponds incorporated within the site plan will likely attract
waterfowl like resident Canada geese and mute swans that will create a nuisance. The
large pond planned next to the athletic field would be especially attractive to these
species. High concentrations of waterfowl in ponds create water-quality problems, leave
droppings on lawn and paved areas and can become aggressive during the nesting season.
Ponds that remain in the plan should be landscaped to deter nuisance species. Short
manicured lawns around ponds provide an attractive habitat for these species. However,
native plantings, including tall grasses, wildflowers, shrubs, and trees at the edge and
within an adequate buffer area (we recommend 50 feet) around ponds, are not as
attractive to geese because they do not feel as safe from predators and other disturbance
when their view of the area is blocked. The Division of Fish and Wildlife does not
provide goose control services, and if problems arise, residents or the home-owners
association will have to accept the burden of dealing with these species (e.g., permit
applications, costs, securing services of certified wildlife professionals). Solutions can be
costly and labor intensive; however, with a reduction in the number of ponds, proper
landscaping, monitoring, and other techniques, geese problems can be minimized.
It is further recommended that all stormwater ponds be at least 100 feet from all wetlands
and waterbodies.
Revegetation/Landscaping
We request that no invasive species be used in the revegetation of disturbed or
landscaped areas. A list of species considered invasive in Delaware can be found on the
DNHP web site, www.dnrec.state.de.us/fw/invasive.htm. We further encourage, where
possible/feasible, the use of native plants for habitat restoration projects on-site and our
Bill McAvoy, Botanist, can be contacted at (302) 653-2880 to assist you in developing a
plant list.
Página 56
PLUS
January 7, 2005
Page 14 of 17
Recreation
We encourage the designer/builder to involve the Dover Parks and Recreation
Department in the recreation components of this project. Zach Carter can be reached at
(302) 736-7050.
We recommend that sidewalks be built fronting every residence and stub streets. A
complete system of sidewalks will: 1) fulfill the recreation need for walking and biking
facilities, 2) provide opportunities for neighbors to interact in the community, and 3)
facilitate safe, convenient off-road access to neighboring communities, public mass
transit stops, schools, stores, work, etc.
Community trail systems with long continuous trails, perimeter-only trails, and systems
with few access points, often go unused and neglected. For trail design/construction
specifications, contact Susan Moerschel at (302) 739-5285.
Underground Storage Tanks
There are six inactive LUST site(s) located near the proposed project:
George & Lynch Inc, Facility # 1-000087, Project # K9402048
Chesapeake Supply & Equipment, Facility # 1-000247, Project # K9705070
Chesapeake Utilities Corp, Facility # 1-000251, Project # K8905233
Dover city Police Department, Facility # 1-000310, Project # K9510232
Coca Cola Bottling Co., Facility # 1-000471, Project # K9306119
B & J Investments, Facility # 1-000601, Project # K0009114
No environmental impact is expected from the above inactive/active LUST site(s).
However, should any underground storage tank or petroleum contaminated soil be
discovered during construction, the Tank Management Branch must be notified as soon
as possible. It is not anticipated that any construction specifications would be need to be
changed due to petroleum contamination. However, should any unanticipated
contamination be encountered and PVC pipe is being utilized, it will need to be changed
to ductile steel in the contaminated areas.
Site Investigation and Restoration
There are 10 SIRB sites located near the proposed project: DE-0060, 1110, 1213, 1212,
1240, 1143, 0057, 1107, 1171, and 1214. Several of these SIRB sites are areas that were
studied as potential Brownfields sites. Other SIRB sites have found that the shallow
groundwater is contaminated with organic compounds. There is PCE in the shallow
groundwater and other dry cleaner solvents; however, it has been found that this
contamination is moving to the southeast from Governors Ave to the St. Jones River, and
it is not likely that the proposed project will be affected. The proposed project application
states that public water will be used, but if domestic wells will be installed, SIRB should
be notified.
Página 57
PLUS
January 7, 2005
Page 15 of 17
Air Quality
Once complete, vehicle emissions associated with this project are estimated to be 47.6
tons (95,163.5 pounds) per year of VOC (volatile organic compounds), 39.4 tons
(78,789.0 pounds) per year of NOx (nitrogen oxides), 29.1 tons (58,131.9 pounds) per
year of SO2 (sulfur dioxide), 2.6 ton (5,174.7 pounds) per year of fine particulates and
3,980.2 tons (7,960,308.1 pounds) per year of CO2 (carbon dioxide).
Emissions from area sources associated with this project are estimated to be 19.2 tons
(38,383.8 pounds) per year of VOC (volatile organic compounds), 2.1 ton (4,223.4
pounds) per year of NOx (nitrogen oxides), 1.8 ton (3,504.8 pounds) per year of SO2
(sulfur dioxide), 2.3 ton (4,522.8 pounds) per year of fine particulates and 77.8 tons
(155,599.3 pounds) per year of CO2 (carbon dioxide).
Emissions from electrical power generation associated with this project are estimated to
be 7.6 tons (15,212.6 pounds) per year of NOx (nitrogen oxides), 26.5 tons (52,913.3
pounds) per year of SO2 (sulfur dioxide) and 3,902.4 tons (7,804,708.8 pounds) per year
of CO2 (carbon dioxide).
VOC NOx SO2 PM2.5 CO2
Mobile 47.6 39.4 29.1 2.6 3980.2
Residential 19.2 2.1 1.8 2.3 77.8
Electrical 7.6 26.5 3902.4
Power
TOTAL 66.8 49.1 57.4 4.9 7960.4
The Eden Hill project will have characteristics that will significantly mitigate the air
quality impacts. The project is a mixed use, live-work community in an infill location,
next to downtown Dover, with a pedestrian network and trails that are connected in
multiple places to the City's existing street and pedestrian network and access to transit.
Regardless, there still will be impacts on air quality from energy use. Electrical usage via
electric power plant generation alone totaled to produce an additional 8 tons of nitrogen
oxides per year and 27 tons of sulfur dioxide per year.
A significant method to mitigate this impact would be to require the builder to construct
Energy Star qualified homes. Every percentage of increased energy efficiency translates
into a percent reduction in pollution. Quoting from their webpage,
http://www.energystar.gov/:
“ENERGY STAR qualified homes are independently verified to be at least 30%
more energy efficient than homes built to the 1993 national Model Energy Code
or 15% more efficient than state energy code, whichever is more rigorous. These
savings are based on heating, cooling, and hot water energy use and are typically
achieved through a combination of:
• building envelope upgrades,
• high performance windows,
Página 58
PLUS
January 7, 2005
Page 16 of 17
• controlled air infiltration,
• upgraded heating and air conditioning systems,
• tight duct systems and
• upgraded water-heating equipment.”
Our energy office in DNREC is in the process of training builders in making their
structures more energy efficient. The Energy Star Program is excellent way to save on
energy costs and reduce air pollution. We highly recommend the Eden Hill development
and other residential proposals increase the energy efficiency of their homes.
State Fire Marshal’s Office – Contact John Rossiter 323-5365
No comment. This project is under the jurisdiction of the City of Dover Fire Marshal.
Department of Agriculture - Contact Mark Davis 739-4811
The Department of Agriculture staff reviewed the Eden Hill Plan and supports the
development concept and design. Ongoing design issues will be addressed with the
Delaware Forest Service, the City of Dover, and the developer. The site is located within
city limits and as such development is appropriate. DDA requests that every effort be
made to preserve any historic structures.
The Delaware Forest Service defers all comments to the City of Dover’s existing land-
use ordinances and extends its services to assist with this project at the request of the City
of Dover.
Delaware Economic Development Office – Contact Dorrie Moore 672-6816
The Delaware Economic Development Office supports the project as it relates to Livable
Delaware. To address concerns about down zoning this industrial parcel that is served by
rail, and in an effort to create employment opportunities, the DEDO would like to join
forces with the Office of State Planning Coordination and the City of Dover to explore
other sites for industrial development throughout the City.
Public Service Commission - Contact Andrea Maucher 739-4247
Any expansion of natural gas or installation of a closed propane system must fall within
Pipeline Safety guidelines. Contact: Malak Michael at (302) 739-4247.
Recent legislation (Senate Bill 99) placed non-governmental companies providing
wastewater services to 50 or more customers (in the aggregate) under the regulatory
control of the PSC. While rules are not yet in place, governmental agencies offering
wastewater services must file data with the Commission regarding its service areas.
Contact: Kevin Neilson at (302) 739-4247.
Delaware State Housing Authority – Contact Jimmy Atkins 739-4263
The proposal is to develop 620 units on 272 acres between West North Street and New
Burton Road on the west side of Dover. According to the State Strategies for Policies
and Spending, the proposal is located in Investment Level Areas 1 and 2. DSHA
Página 59
PLUS
January 7, 2005
Page 17 of 17
supports this proposal because it is located in an area where the state is encouraging
compact, mixed use, and superior design. Furthermore, the proposal builds upon the
State’s Livable Delaware initiative and targets first time homebuyers. The provision of
this type of unit will help address the need for affordable homeownership opportunities
identified in the 2003 Statewide Housing Needs Assessment.
Delaware Emergency Management Agency – Contact Don Knox 659-3362
No comment.
Department of Education – Contact Nick Vacirca 739-4658
No comment.
This concludes our comments. Upon filing of an application with the local jurisdiction,
the applicant shall provide to the local jurisdiction and the Office of State Planning
Coordination a written response to these comments noting whether or not specific
recommendations were incorporated into the project design and the reasons therefore.
Thank you for the opportunity to review this project. If you have any questions, please
contact me at 302-739-3090.
Sincerely,
Constance C. Holland, AICP
Director
CC: City of Dover
Página 60
June 6, 2005
Constance Holland, AICP
Delaware State Office of Planning Coordination
540 S. Dupont Highway, Suite 7
Dover, DE 19901
RE: Preliminary Land Use Service
EDEN HILL FARMS
Dover, Delaware
1999053.04
Dear Ms. Holland:
The Delaware Office of State Planning Coordination reviewed the proposed plans for re-
zoning of Eden Hill farms from IP/AG to TND in the City of Dover through their
Preliminary Land Use Service (PLUS) process on January 7, 2005. The developers are
seeking approval for a 620-unit mixed use development between North Street and New
Burton Road on the west side of Dover.
Attached, are the PLUS comments received by the various state agencies, with our
response in italics and a revised master plan as a result of PLUS comments:
Office of State Planning Coordination – Contact David Edgell 739-3090
This project is located in Investment Level 1according to the 2004 State Strategies for
Policies and Spending. This site is also located in the City of Dover. Investment Level 1
reflects areas that are already developed in an urban or suburban fashion, where
infrastructure is existing or readily available, and where future redevelopment or infill
projects are expected and encouraged by State policy. This project is a mixed use project
providing commercial, office, residential and open space uses. Our office supports
mixed use infill projects as essential to the Livable Delaware strategy of
concentrating growth in and around existing communities and infrastructure. This is
the type of project that is highly desirable to allow us to meet our goals of revitalizing our
already urbanized areas while protecting agricultural lands and natural resource areas from
encroachment by sprawling suburban and rural development. Our office has no objections
to the proposed rezoning and development of this project in accordance with the relevant
City codes and ordinances.
In addition, we would like to commend the property owners, developers, and project
designers for working collaboratively with the State to instill this project with an
exceptionally high level of urban design quality and open space preservation. There have
been many months of discussions between and amongst these parties, and the result is
truly a project which we are sure will fit well into its immediate surroundings, the
available and future infrastructure, and the fabric of the City as a whole.
We are particularly encouraged that the owners and applicants have chosen to develop a
“Traditional Neighborhood Design”. For the most part, this development appears to be
consistent with the principals of “Traditional Neighborhood Design” (which is also known
as “New Urbanism” by some planners and architects). Portions of this development
Page 1 of 19
Página 61
embody all six of the guiding principals found in our publication titled Better Models for
Development in Delaware:
Principle 1. Conserve Farmland, Open Space, and Scenic Resources: This plan has a
significant and noteworthy open space component. The important historic farmstead and
“tree alleys” were preserved. Too often open space is an afterthought – here you have
made it a guiding principle in the design of the project, and chosen to integrate open
spaces that relate to the historical use of the property as a farm. These open spaces will be
valuable features for residents, employees, and the larger City of Dover community. The
large park area in the southwestern corner of the site will have a great benefit for regional
recreation.
Principle 2. Maintain a Clear Edge Between the Town and Countryside: This chapter
of Better Models talks about the importance of growing through infill and redevelopment,
rather than sprawling outward and impacting farmland and open space. This principle is
addressed through the project’s location as an infill parcel. This project will provide a
range of residences, jobs, commercial, and professional services close to Dover’s
downtown, rather than on a greenfield site on the edge of town or in a rural area.
Principle 3. Build Livable Communities: The term “livable communities” can mean
many things to many people. We are impressed that the owners, developers, and
designers have incorporated so many different aspects of community life into this mixed
use plan. Most new developments we see through PLUS contain homes and some
component of open space. New residents are compelled to drive to work, to shop, to go to
restaurants, and even to go to a park. This development provides not only homes but
extensive open space, preserved historic sites, commercial services and medical and office
uses. It is truly a live-work community that can meet a range of needs for future residents
and employees alike.
Principle 4. Preserve Historic Resources: The owners, designers, and developers
thought of preservation first and protected the historic structures, tree alleys and open
space on the site.
Principle 5. Respect Local Character in New Construction: The choice of the
“Traditional Neighborhood Design” style of development has resulted in a traditionally
designed street pattern that mimics the general design of the street pattern in many older
communities, Dover included. While we have not seen nor reviewed any conceptual
architectural drawings for the buildings we understand that the City of Dover’s ordinance
does compel the applicants to link the architectural design to historic precedents in Dover
and the region.
Principle 6. Reduce the Impact of the Car: One of the basic tenets of Traditional
Neighborhood Design is to design developments for people first by creating human scale
streetscapes. There is no denying that the automobile has transformed our culture in the
last 50 – 60 years, and the best Traditional Neighborhood Design projects balance the
design goals of creating the human scale streetscape with the reality and necessity of
accommodating automobiles. The relationship between the buildings and the streets and
open spaces is very important in creating the “public rooms” and “public spaces” that
define all of our great cities and towns. This plan is largely successful in this regard.
With the notable exception of the medical office complex, the buildings are oriented to the
Page 2 of 19
Página 62
streets, and parking is available on the street, behind commercial buildings, in alleys or on
individual lots. The streets also appear to be very pedestrian friendly, and there are a
network of trails and paths linking the different components of the development which
will provide residents and employees the option of walking for recreation or to get to the
different uses on the site.
As noted above in Principle 6, the one disappointing aspect of this plan is the medical
complex. The design, as presented, does not appear to be consistent with the overall
“Traditional Neighborhood Design” design philosophy in the following regards:
1. No Mixed Uses: This district appears to be a single use district for medical
offices. The design and marketability of the project could probably be enhanced
by integrating other uses into this complex. Residential uses, such as condo or
apartment units, or perhaps a residential and nursing facility for the elderly might
be good matches. Small-scale commercial uses that serve the medical complex
(snack bars, gift shops, etc.) would also probably work well in this portion of the
plan.
2. The Buildings Do Not Contribute to Urban Form: As designed, the
buildings are completely surrounded by parking. This design has more in
common with a typical suburban mall than it does with a Traditional
Neighborhood Design. One of the basic principles of Traditional Neighborhood
Design is that the buildings should frame streets (to create streetscapes) and open
spaces (to create three dimensional public spaces). Parking is essential to any
urban or suburban use, but the best Traditional Neighborhood Design projects
balance this by designing buildings that hide the parking in internal blocks, place
it on the streets, integrate parking structures, or a combination of all three. The
appearance, function, and success of this component of the plan could be
enhanced by revisiting the basic design of the buildings as they relate to the streets
and open spaces. The goal should be to reduce the visual impact of the parking
while using buildings to enhance the urban form of streets and open spaces.
3. An Excessive Amount of Parking: We have not done any detailed
calculations, but it does appear that the amount of parking proposed is more
typical of a suburban mall than a mixed use, infill project. The parking
calculations typically used for suburban commercial and office uses tend to
assume a “worst case scenario” of full occupation of the use at all times, and that
there are no alternatives to driving to the site. This project is accessible to transit,
and will be connected to other neighborhoods and employment sites through a
pedestrian network. The mixed-use nature of the project may also decrease single
occupant vehicle trips and provide for joint use parking. We ask the applicants to
reconsider the total amount of parking provided. Other project goals, such as
providing parking near the building entrance for patients, could be met by
reserving certain spaces or instituting other parking restrictions rather than by
providing an excessive amount of parking. This is an extremely valuable piece of
property. It would be a shame to not take advantage of opportunities to maximize
its use in order to provide extra parking for vehicles that will rarely be used.
Page 3 of 19
Página 63
To summarize, our office commends the applicants, owners, designers, and developers for
proposing a very innovative and creative mixed-use project on an important infill parcel in
Dover. This project combines elements of all six “Design Principles” encouraged by
Better Models for Development in Delaware into a very attractive and viable project for
the City of Dover. We do ask that the designers and applicants consider making some
design changes to the medical complex in order to ensure that it is consistent with the high
level of design quality exhibited by the rest of the development proposal. Please note
below that the State Historic Preservation Office has some more detailed design comments
for the project that are intended to improve the integration of the new development with
the historic resources on the site. Please consider these design comments as well.
Our office has no objections to the rezoning and development of this project in accordance
with all of the relevant City codes and ordinances. In addition, we would like to extend an
invitation to the designers and developers of the medical office plan component to meet
with us to discuss design alternatives. Our office will be able to provide examples of other
successful “Traditional Neighborhood Designs” and provide design assistance based on
the concepts found in Better Models for Development in Delaware.
No response required.
State Historic Preservation Office (SHPO) – Contact Anne McCleave 739-5685
Eden Hill is listed in the National Register of Historic Places because of its contribution to
agriculture, its association with significant people (Nicholas Ridgley), its architecture, and
its potential to yield information (historic information illustrated in the initial construction
and subsequent additions and alterations of the house). The property retains its historic
integrity, including location, setting, design, feeling, workmanship, and association. The
property’s history and its visual representation and continuity of that history are important
characteristics of the property.
It is good to see that the proposed plan includes retention of the house and outbuildings,
and some historic landscape features, such as the historic entrances to the property.
Nevertheless, the proposed development represented in the Master Plan would have an
adverse effect on the historic property. We feel the design of the Master Plan could be
more sensitive to the historic property. A large block of preserved open space around the
historic buildings, rather than the “strips” of open space shown in the Master Plan, would
have been more ideal.
As proposed, the development is too densely located around the historic buildings,
resulting in diminishment of the historic property’s integrity of setting, feeling, and
association. We appreciate the attempt to develop a Traditional Neighborhood
Development design and feel the design is successful in the residential section of the
property; however, we feel the design is unsuccessful with the medical and commercial
complexes on the northern part of the development. We suggest the following changes to
the plan:
1) The Medical Complex turns in on itself and becomes an isolated component of the
development instead of being part of the Traditional Neighborhood.
Page 4 of 19
Página 64
We have met with the City of Dover and the Owners to provide a more
introspective approach to the design while allowing cross access from the
commercial and medical neighborhoods via a main street.
Reduce amount of parking spaces.
We will work with the City of Dover to identify parking requirements.
2) Move some of the three story condominiums to the south portion of the Medical
Complex, which could help the complex become part of the Traditional
Neighborhood.
We will take this comment into consideration during the design. The office area
has been redesigned to respect the feel of the Dover Legislative Hall, thus
providing a TND design element.
3) Move the condominiums immediately south of the Allee and open space to the
north side of The Allee.
a. Currently, the design of the Allee includes residential/condominiums on
the south side and a landscape buffer, backs of medical buildings, and
parking on the north side. Moving some of the condominiums to the north
side of the Allee enhances the streetscape and Traditional appearance.
Streetscape has been enhanced with more urban layout accomplishing the
goal.
b. As stated above, this would help tie the medical office complex into the
development; and
Relocation of entrance into the medical complex at Clarence Street meets
the intent of the comment and provides connectivity to both
neighborhoods.
c. Allow for more open space within the condominium section, minimizing
the density of the condominiums and minimizing the effect on the historic
buildings.
Open space on the property is in excess of 40%.
4) The Commercial Complex, located on the northwest corner, affects the historic
property, specifically the proposed grocery store located immediately adjacent to
the historic buildings.
a. The size and massing of the grocery store is not compatible with the
historic buildings.
The grocery store has been moved away from the historic buildings,
toward Kraft Foods..
b. The grocery store use would require truck access to the back of the
building, which abuts the historic property, and debris and other
equipment resulting from the grocery store use will find its way onto the
historic property.
Page 5 of 19
Página 65
Fencing and screening have been added to alleviate the concern.
c. If it is necessary for a grocery store or big box building to be located on
this property, we suggest locating with the retail/office buildings.
This comment has addressed in the revised layout. The grocery store
location and the medical office district would yield same issues.
d. Locating the grocery store away from the historic buildings and the
“traditional main street” closer to the historic buildings provides a more
traditional and compatible use and design.
Design has been modified per the above comment.
5) Remove the proposed road between the historic buildings and the “future public
use” building and remove the road connecting the Medical Complex to the
Commercial Complex.
a. This will provide a unity to the open space; and
b. Provide a better connection between the “future public use” building and
the historic buildings.
Change made. Road removed. Future public use building is now on the same
parcel as the historic home.
There are Native American archaeological sites on the south part of the Master
Plan and a high probability for historic archaeological sites in the area surrounding
the house and the hedgerows. The potential historic sites are associated with the
house and past outbuildings.
c. We recommend the developers and DelDOT hire an archaeological
consultant to provide a Phase I survey of their respective properties
(SHPO can provide a scope of work).
A cultural resource survey – archeological site form has been obtained
from Bureau of Archaeology and Historic Preservation. Archeological
and historic sites identified are not part of the development area, and are
in the open space acres. Any further investigation will be coordinated
with SHPO.
6) The arc road connection on the western side of the Allee separates the open space.
This road connection should be designed and landscaped to blend in as much as
possible and to contain a pedestrian connection or crosswalk to connect the two
sides of the open space. Parking should be restricted in the arc to limit the visual
impact cars would have on the continuity of the historic open space.
Design changed per the comment. Walking path, landscaping and minor parking
access to the open space have met comments intent.
7) Road widths should be consistent with traditional town street widths.
Roadways have been designed to meet traditional street widths and comply with
emergency access needs.
Page 6 of 19
Página 66
8) Make sure the construction is high quality throughout the development.
Furthermore, new construction, while keeping with the traditional town feel,
should be compatible with the historic buildings in scale, materials and
workmanship.
Pattern book identifies construction materials and quality..
9) As the development is designed, we are confident that the landscaping will be
appropriate for a Traditional Neighborhood Development. Please keep in mind
that the historic landscape of this property is the open space. Planting additional
landscape features along the edges of the open space may work to buffer the new
developments from the historic property. However, a large amount of buffering
would be unnecessary if the design of the new development is sensitive to the
historic property.
The design as revised provides open space buffers around historical and cultural
features and screening where appropriate.
10) As the use of the historic buildings may change, SHPO can provide assistance to
DelDOT and other parties involved in determining future uses and rehabilitation
and preservation of the buildings. SHPO would also like to assist with any new
construction in the public areas as it relates to compatibility, design, siting, etc.
This includes the “future use public building” indicated on the plan.
Assistance from SHPO welcome.
The historic complex is the attraction of the property. The design of the plan should focus
on the property’s historic attraction and not hide it from view by locating the dense
development so close to the historic buildings and along the outer streets. The design of
the development should illustrate the open space that has always been historically
associated with the property. A better open space design would preserve the property’s
integrity. We hope the developers use the historic property to their advantage and take our
suggestions into consideration.
Agree with the intent of the comment and believe the revised design respects the comment.
Department of Transportation – Contact: Bill Brockenbrough 760-2109
Daniel & Deborah Scheller seek to develop an approximately 272-acre assemblage of
parcels (Tax Parcels ED-05-076.00-01-13.00-000, ED-05-076.00-01-14.00-000, ED-05-
076.00-01-14.01-000) on the south side of West North Street (Kent Road 73) and the west
side of the Norfolk Southern railroad tracks in the City of Dover. The development would
be neo-traditional in design and would include 620 dwellings of various types, 134,400
square feet of commercial uses, a 280,000 square foot medical complex and a seasonal
farmer’s market pavilion. The land is zoned IP/Ag (Industrial Park and Agriculture) and a
rezoning to TND (Traditional Neighborhood Design) would be needed for the proposed
development to proceed.
Our comments are as follows:
1) DelDOT has been an active participant in the development of the concept plan for
this project and has spent over $2,400,000, appropriated through three different
Page 7 of 19
Página 67
Bond Bills, for planning and acquiring the 28 acres including the farmstead. We
fully support the proposed rezoning. We wish to continue working with the
design team for both the medical complex and the residential development to
arrive at the best arrangement of building sites and streets, in the interest of safety
and efficiency.
No response required.
2) We are interested in reconnecting Eden Hill Farm to Water Street for the purpose
of providing good access to the medical complex and the townhouse and
condominium uses. However, making this connection across the Norfolk
Southern railroad tracks at grade will require the closure of an existing grade
crossing in another location. We are working with Norfolk Southern to
accomplish that. If we are unsuccessful in that regard, legislation will be
necessary to permit the creation of a new grade crossing at Water Street.
No response required.
3) The road that is shown on the Master Plan as “Salisbury Rd.” would be an
extension of Saulsbury Road (Kent Road 156). DelDOT has a project, known as
the West Dover Connector (WDC), which could extend Saulsbury Road from its
intersection with West North Street to an as yet undetermined point on New
Burton Road (Kent Road 190). Accordingly, since this road may become part of
Saulsbury Road, it should be designed and built to State standards. Presently we
do not have a typical section that we would use in extending Saulsbury Road, but
we expect to develop one for planning purposes in 2005. In planning the
development, we recommend that a 150-foot right-of-way be set aside for
Salisbury Road. Any typical section that we are likely to develop would fit within
that width. If the developer is ready to proceed with the first phase of
development before the appropriate road section has been determined we will
work with the developer on a suitable alternative or temporary access arrangement
so the project is not delayed. Regarding the alignment of the WDC, thus far we
have developed several concepts. We are not referring to them as “alternatives”
because “alternative” is a defined term in the National Environmental Policy Act
(NEPA) process and we are only just beginning that process. As mentioned at the
PLUS meeting, all of the concepts that involve extending Saulsbury Road follow
the proposed Salisbury Road south to the proposed roundabout and depart from
there. As also mentioned, some of those concepts would extend the road through
the proposed development. It is also possible that the stormwater management
pond may need to be moved, as alternative alignments receive further study as
part of the NEPA process (preparation of either an Environmental Impact
Statement (EIS) or an Environmental Assessment (EA)). Depending on that
outcome, we may then be able to change that recommendation. We expect to
complete the NEPA process and arrive at a determination in 2006. DelDOT’s
preference is that the developers delay the platting of this area until the
alternatives have been selected. However, we are aware that the developer must
show a conceptual master plan for this site in order to apply for the rezoning at the
City. Any plan that is presented to the City for this section should contain the
caveat that the area south of the round about may need to be redesigned or re-
Page 8 of 19
Página 68
platted based on the desired alternatives selected through the WDC study process.
The project should also be phased so that the area south of the roundabout is in a
later phase of construction. More information about the WDC project is available
at www.DelDOT.net. Questions regarding the project may be directed to our
project manager, Mr. Jay Kelley at (302) 760-2365.
We will work with DelDOT representatives regarding the extension of Saulsbury
Road.
4) While not required as part of the City’s approval process, a traffic impact study
(TIS) is important to ensure that the transportation infrastructure needed to
support this development is sized properly. We recognize that the WDC, if it is
built, will significantly change travel patterns in the area of this project and we
take responsibility for having the area road network function well in that event.
However, the developers of Eden Hill Farm want to proceed now and we have not
yet determined what, if any, alignment will be built for the West Dover
Connector. Therefore, at least the initial phases of the development must be
designed, and have sufficient improvements to the existing road network, to
function without the WDC. As part of the engineering studies done for the WDC,
a significant amount of traffic data has been collected. That data is available
from Mr. Kelley and may be used in the TIS. To obtain a scope of work for the
TIS, the developer should have their traffic engineer contact our project engineer,
Mr. Todd Sammons, at (302) 760-2134.
Growth projections and intersection analysis of the developments impact on the
existing roads will be provided in the design and permit stages of the project.
5) The developer’s engineer should contact our project manager for Kent County,
Mr. Brad Herb of Johnson, Mirmiran & Thompson, regarding our requirements
for access. Mr. Herb may be reached at (302) 266-9080.
The developers will contact Mr. Herb to discuss access requirements.
Delaware Transit Corporation – Contact Catherine Dennis 739-3278
The area is served by DART Routes 102, 113 on North St. and Route 103 on New Burton
Road. DART requests the site plan include sidewalks and wishes to discuss the possibility
of implementing bus stops. Please contact DART Planner Wayne Henderson at (302)
577-3278 extension 3553.
The developers will contact Mr. Henderson to discuss the possibility of implementing bus
stops.
Department of Natural Resources and Environmental Control – Contact Kevin
Coyle 739-3091
General Comment
This project plan represents what Livable Delaware should be about. The plan preserves
wetlands and forests. It provides ample recreational opportunity and is within an
established metropolitan region.
No response required.
Page 9 of 19
Página 69
Soils
According to the Kent County soil survey, Sassafras and Woodstown were mapped in the
immediate vicinity of the proposed construction. Sassafras is well-drained upland soil that
has few limitations for development. Woodstown is a moderately well-drained soil of low-
lying uplands that has moderate limitations for development.
No response required.
Wetlands
Statewide Wetland Mapping Project (SWMP) maps indicate the presence of palustrine
wetlands.
Site plans show that there will not be direct impacts to these wetlands through construction
activities; however, secondary impacts of construction could be detrimental to the health
of these wetlands and their associated streams. These wetlands are regulated by the Army
Corps of Engineers through Section 404 of the Clean Water Act. In addition, individual
404 permits and certain Nationwide Permits from the Army Corps of Engineers also
require 401 Water Quality Certification from the DNREC Wetland and Subaqueous Land
Section and Coastal Zone Federal Consistency Certification from the DNREC Division of
Soil and Water Conservation, Delaware Coastal Programs Section. Each of these
certifications represents a separate permitting process. Impacts to streams and associated
riparian wetlands, including road crossings, are regulated by the DNREC Wetlands and
Subaqueous Lands Section, and by the Corps of Engineers.
These wetlands provide water quality benefits, attenuate flooding and provide important
habitat for plants and wildlife. Vegetated buffers of no less than 100 feet should be
employed from the edge of the wetland complex. The developer should note that both
DNREC and Army Corps of Engineers discourage allowing lot lines to contain wetlands
to minimize potential cumulative impacts resulting from unauthorized and/or illegal
activities and disturbances that can be caused by homeowners.
To find out more about permitting requirements, the applicant is encouraged to attend a
Joint Permit Process Meeting. These meetings are held monthly and are attended by
federal and state resource agencies responsible for wetland permitting. Contact Denise
Rawding at (302) 739-4691 to schedule a meeting.
The developers will contact Ms. Rawding to discuss and schedule a meeting.
TMDLs
Although Total Maximum Daily Loads (TMDLs) as a “pollution runoff mitigation
strategy” to reduce nutrient loading have not yet been developed for most of the tributaries
or subwatersheds of the Delaware Bay watershed to date, work is continuing on their
development. TMDLs for the St. Jones River subwatershed, of which this parcel is part,
are scheduled for completion in December 2006.
Therefore, until the specified TMDL reductions and pollution control strategies are
adopted, it shall be incumbent upon the developer to employ best available technologies
(BATS) and/or best management practices (BMPs) as “methodological mitigative
strategies” to reduce degradative impacts associated with development.
Page 10 of 19
Página 70
No response required.
Water Supply
The project information sheets state water will be provided to the project by the City of
Dover via a central water system. Our records indicate that the project is located within
the public water service area granted to the City of Dover under Certificate of Public
Convenience and Necessity 90-CPCN-07.
Should dewatering points be needed during any phase of construction, a dewatering well
construction permit must be obtained from the Water Supply Section prior to construction
of the well points. In addition, a water allocation permit will be needed if the pumping rate
will exceed 50,000 gallons per day at any time during operation.
All well permit applications must be prepared and signed by licensed water well
contractors, and only licensed well drillers may construct the wells. Please factor in the
necessary time for processing the well permit applications into the construction schedule.
Dewatering well permit applications typically take approximately four weeks to process,
which allows the necessary time for technical review and advertising.
Should you have any questions concerning these comments, please contact Rick Rios at
302-739-3665.
City of Dover Public Works has indicated adequate capacity to serve the development as
proposed.
Sediment and Erosion Control/Stormwater Management
Requirements:
1) Land disturbing activities in excess of 5,000 square feet are regulated under the
Delaware Sediment and Stormwater Regulations. A detailed sediment and
stormwater management plan must be reviewed and approved by the Kent
Conservation District prior to any land disturbing activity (i.e. clearing, grubbing,
filling, grading, etc.) taking place. The review fee and a completed Application for
a Detailed Plan are due at the time of plan submittal to the Kent Conservation
District. Construction inspection fees based on developed area and stormwater
facility maintenance inspection fees based on the number of stormwater facilities
are due prior to the start of construction. Please refer to the fee schedule for those
amounts.
We will provide a detailed Sediment and Stormwater Management Plan to Kent
Conservation District as required, along with the applications and appropriate
fee.
2) The following notes must appear on the record plan:
• The Kent Conservation District reserves the right to enter private property for
purposes of periodic site inspection.
• The Kent Conservation District reserves the right to add, delete, or modify any
erosion or sediment control measure, as it deems necessary.
• A clear statement of defined maintenance responsibility for stormwater
management facilities must be provided on the Record Plan.
Page 11 of 19
Página 71
We will add the notes during the Implementation phase of the project.
3) Ease of maintenance must be considered as a site design component and a
maintenance set aside area for disposal of sediments removed from the basins
during the course of regular maintenance must be shown on the Record Plan for
the subdivision.
We will comply with this comment.
4) All drainage ways and storm drains should be contained within drainage
easements and clearly shown on the plan to be recorded by the City of Dover.
We will comply with this comment.
5) A soils investigation supporting the stormwater management facility design is
required to determine impacts of the seasonal high groundwater level and soils for
any basin design.
We will provide the soils investigation information.
Comments:
1) This project outfalls to both the Puncheon Run and the Tar Ditch drainage systems
which both have a well documented history of flooding downstream from this site.
A downstream drainage study will be required for this project to determine the
impacts of the site development on those systems. Stormwater management
requirements for this site will be based on the results of the drainage study and
may involve over-managing the stormwater discharges from this site in order to
minimize downstream flooding. Groundwater recharge is encouraged, however,
without proper construction techniques and effective maintenance, infiltration
practices have a high failure rate. Any infiltration practice must meet the
minimum requirements for infiltration design and be constructed in strict
accordance with the approved plan.
We will provide the downstream drainage study, and work with Kent
Conservation District in identifying the stormwater management requirements.
2) It appears that the existing stormwater facility near the northeast corner of the
project is to be expanded. Since this facility was constructed by DelDOT,
confirmation will be requested that DelDOT will allow this project to utilize that
facility and who is responsible for its maintenance.
An agreement to utilize the existing pond is being pursued by the developers.
3) It is recommended that the stormwater management areas be incorporated into the
overall landscape plan to enhance water quality and to make the stormwater
facility an attractive community amenity.
We will take this comment into consideration during the design phase.
Page 12 of 19
Página 72
4) A letter of no objection to recordation will be provided once the detailed Sediment
and Stormwater Management plan has been approved.
No response required.
5) Proper drainage of developed lots and active open space should be considered in
the development of the grading plan for this subdivision.
We will provide proper drainage of developed lots and active open space.
6) Based on the site characteristics, a pre-application meeting is suggested to discuss
stormwater management and drainage for this site.
We will schedule a preapplication meeting to discuss stormwater management for
this project.
Drainage
The Drainage Section is aware of existing drainage problems on Puncheon Run,
downstream of this project. The Drainage Section requests the volume of stormwater
released offsite match existing pre-construction volume, and that stormwater infiltration
practices be utilized on this project.
We intend to comply with the states sediment and stormwater management requirements.
The Drainage Section further requests that all precautions be taken to ensure the project
does not hinder any off site drainage upstream of the project or create any off site drainage
problems downstream by the release of on site stormwater.
We will take this comment into consideration during the Implementation phase of the
project.
Floodplains
A small portion of the site is within the 100-year floodplain. Development should be
limited to areas outside of the floodplain
We will not develop within the floodplain, floodplain area identified in an open space.
Forests
According to 2002 aerial photos, forested areas are found in the southwestern portion of
the parcel and along a strip in the northeastern portion. The developer is strongly
encouraged to preserve, and where possible, enhance forested resources on site. The
forested areas on-site should be viewed as a community asset and managed appropriately.
Existing forest and historic trees aligning access ways of the past are being maintained..
Forested areas on-site set aside for conservation purposes should be placed into a
permanent conservation easement or other binding protection. These areas should be
Page 13 of 19
Página 73
clearly marked and delineated so that residents understand their importance and so that
homeowner activities do not infringe upon these areas.
We will take this comment into consideration during the Implementation phase of the
project.
Open Space
PLUS materials indicate that 115 acres of open space is proposed for this parcel.
In areas set aside for passive open space, the developer is encouraged to consider
establishment of additional forested areas or meadow-type grasses. Once established, these
ecosystems provide increased water infiltration into groundwater, decreased run-off into
surface water, air quality improvements, and require much less maintenance than
traditional turf grass, an important consideration if a homeowners association will take
over responsibility for maintenance of community open spaces.
We will take this comment into consideration during the Implementation phase of the
project once all open space uses have been identified.
Open space containing forest and/or wetlands should be placed into a permanent
conservation easement or other permanent protection mechanism. Conservation areas
should also be demarked to avoid infringement by homeowners.
We will take this comment into consideration during the Implementation phase of the
project.
Stormwater Ponds, Buffers, and Nuisance Species
The stormwater management ponds incorporated within the site plan will likely attract
waterfowl like resident Canada geese and mute swans that will create a nuisance. The
large pond planned next to the athletic field would be especially attractive to these species.
High concentrations of waterfowl in ponds create water-quality problems, leave droppings
on lawn and paved areas and can become aggressive during the nesting season.
Ponds that remain in the plan should be landscaped to deter nuisance species. Short
manicured lawns around ponds provide an attractive habitat for these species. However,
native plantings, including tall grasses, wildflowers, shrubs, and trees at the edge and
within an adequate buffer area (we recommend 50 feet) around ponds, are not as attractive
to geese because they do not feel as safe from predators and other disturbance when their
view of the area is blocked. The Division of Fish and Wildlife does not provide goose
control services, and if problems arise, residents or the home-owners association will have
to accept the burden of dealing with these species (e.g., permit applications, costs,
securing services of certified wildlife professionals). Solutions can be costly and labor
intensive; however, with a reduction in the number of ponds, proper landscaping,
monitoring, and other techniques, geese problems can be minimized.
No response required.
Page 14 of 19
Página 74
It is further recommended that all stormwater ponds be at least 100 feet from all wetlands
and waterbodies.
We will take this comment into consideration, current plan respects this comment.
Revegetation/Landscaping
We request that no invasive species be used in the revegetation of disturbed or landscaped
areas. A list of species considered invasive in Delaware can be found on the DNHP web
site, www.dnrec.state.de.us/fw/invasive.htm. We further encourage, where
possible/feasible, the use of native plants for habitat restoration projects on-site and our
Bill McAvoy, Botanist, can be contacted at (302) 653-2880 to assist you in developing a
plant list.
The developer will contact Mr. McAvoy during the Implementation phase of the project to
aid in minimizing invasive species being introduced into the area.
Recreation
We encourage the designer/builder to involve the Dover Parks and Recreation Department
in the recreation components of this project. Zach Carter can be reached at (302) 736-
7050.
The developer will contact Mr. Carter during the Implementation phase of the project,
which is a required element of the city process.
We recommend that sidewalks be built fronting every residence and stub streets. A
complete system of sidewalks will: 1) fulfill the recreation need for walking and biking
facilities, 2) provide opportunities for neighbors to interact in the community, and 3)
facilitate safe, convenient off-road access to neighboring communities, public mass transit
stops, schools, stores, work, etc.
Sidewalks, walking paths, and bike transit corridors have all been added to the design.
Community trail systems with long continuous trails, perimeter-only trails, and systems
with few access points, often go unused and neglected. For trail design/construction
specifications, contact Susan Moerschel at (302) 739-5285.
The developer will contact Ms. Moerschel during the Implementation phase of the project,
and has provided a community trail.
Underground Storage Tanks
There are six inactive LUST site(s) located near the proposed project:
George & Lynch Inc, Facility # 1-000087, Project # K9402048
Chesapeake Supply & Equipment, Facility # 1-000247, Project # K9705070
Chesapeake Utilities Corp, Facility # 1-000251, Project # K8905233
Dover city Police Department, Facility # 1-000310, Project # K9510232
Coca Cola Bottling Co., Facility # 1-000471, Project # K9306119
B & J Investments, Facility # 1-000601, Project # K0009114
Page 15 of 19
Página 75
No environmental impact is expected from the above inactive/active LUST site(s).
However, should any underground storage tank or petroleum contaminated soil be
discovered during construction, the Tank Management Branch must be notified as soon as
possible. It is not anticipated that any construction specifications would be need to be
changed due to petroleum contamination. However, should any unanticipated
contamination be encountered and PVC pipe is being utilized, it will need to be changed to
ductile steel in the contaminated areas.
No comment required.
Site Investigation and Restoration
There are 10 SIRB sites located near the proposed project: DE-0060, 1110, 1213, 1212,
1240, 1143, 0057, 1107, 1171, and 1214. Several of these SIRB sites are areas that were
studied as potential Brownfields sites. Other SIRB sites have found that the shallow
groundwater is contaminated with organic compounds. There is PCE in the shallow
groundwater and other dry cleaner solvents; however, it has been found that this
contamination is moving to the southeast from Governors Ave to the St. Jones River, and
it is not likely that the proposed project will be affected. The proposed project application
states that public water will be used, but if domestic wells will be installed, SIRB should
be notified.
City of Dover to provide all water to the development.
Air Quality
Once complete, vehicle emissions associated with this project are estimated to be 47.6
tons (95,163.5 pounds) per year of VOC (volatile organic compounds), 39.4 tons
(78,789.0 pounds) per year of NOx (nitrogen oxides), 29.1 tons (58,131.9 pounds) per
year of SO2 (sulfur dioxide), 2.6 ton (5,174.7 pounds) per year of fine particulates and
3,980.2 tons (7,960,308.1 pounds) per year of CO2 (carbon dioxide).
Emissions from area sources associated with this project are estimated to be 19.2 tons
(38,383.8 pounds) per year of VOC (volatile organic compounds), 2.1 ton (4,223.4
pounds) per year of NOx (nitrogen oxides), 1.8 ton (3,504.8 pounds) per year of SO2
(sulfur dioxide), 2.3 ton (4,522.8 pounds) per year of fine particulates and 77.8 tons
(155,599.3 pounds) per year of CO2 (carbon dioxide).
Emissions from electrical power generation associated with this project are estimated to be
7.6 tons (15,212.6 pounds) per year of NOx (nitrogen oxides), 26.5 tons (52,913.3 pounds)
per year of SO2 (sulfur dioxide) and 3,902.4 tons (7,804,708.8 pounds) per year of CO2
(carbon dioxide).
VOC NOx SO2 PM2.5 CO2
Mobile 47.6 39.4 29.1 2.6 3980.2
Residential 19.2 2.1 1.8 2.3 77.8
Electrical 7.6 26.5 3902.4
Power
TOTAL 66.8 49.1 57.4 4.9 7960.4
Page 16 of 19
Página 76
The Eden Hill project will have characteristics that will significantly mitigate the air
quality impacts. The project is a mixed use, live-work community in an infill location,
next to downtown Dover, with a pedestrian network and trails that are connected in
multiple places to the City's existing street and pedestrian network and access to transit.
Regardless, there still will be impacts on air quality from energy use. Electrical usage via
electric power plant generation alone totaled to produce an additional 8 tons of nitrogen
oxides per year and 27 tons of sulfur dioxide per year.
A significant method to mitigate this impact would be to require the builder to construct
Energy Star qualified homes. Every percentage of increased energy efficiency translates
into a percent reduction in pollution. Quoting from their webpage,
http://www.energystar.gov/:
“ENERGY STAR qualified homes are independently verified to be at least 30% more
energy efficient than homes built to the 1993 national Model Energy Code or 15% more
efficient than state energy code, whichever is more rigorous. These savings are based on
heating, cooling, and hot water energy use and are typically achieved through a
combination of:
• building envelope upgrades,
• high performance windows,
• controlled air infiltration,
• upgraded heating and air conditioning systems,
• tight duct systems and
• upgraded water-heating equipment.”
Our energy office in DNREC is in the process of training builders in making their
structures more energy efficient. The Energy Star Program is excellent way to save on
energy costs and reduce air pollution. We highly recommend the Eden Hill development
and other residential proposals increase the energy efficiency of their homes.
No response required.
State Fire Marshal’s Office – Contact John Rossiter 323-5365
No comment. This project is under the jurisdiction of the City of Dover Fire Marshal.
No response required, applicant will meet with city Fire Marshal.
Department of Agriculture - Contact Mark Davis 739-4811
The Department of Agriculture staff reviewed the Eden Hill Plan and supports the
development concept and design. Ongoing design issues will be addressed with the
Delaware Forest Service, the City of Dover, and the developer. The site is located within
city limits and as such development is appropriate. DDA requests that every effort be
made to preserve any historic structures.
The Delaware Forest Service defers all comments to the City of Dover’s existing land-use
ordinances and extends its services to assist with this project at the request of the City of
Dover.
Page 17 of 19
Página 77
No response required.
Delaware Economic Development Office – Contact Dorrie Moore 672-6816
The Delaware Economic Development Office supports the project as it relates to Livable
Delaware. To address concerns about down zoning this industrial parcel that is served by
rail, and in an effort to create employment opportunities, the DEDO would like to join
forces with the Office of State Planning Coordination and the City of Dover to explore
other sites for industrial development throughout the City.
No response required, historic structures and wooded areas being preserved.
Public Service Commission - Contact Andrea Maucher 739-4247
Any expansion of natural gas or installation of a closed propane system must fall within
Pipeline Safety guidelines. Contact: Malak Michael at (302) 739-4247.
No response required applicant will contact Michael Malaer.
Recent legislation (Senate Bill 99) placed non-governmental companies providing
wastewater services to 50 or more customers (in the aggregate) under the regulatory
control of the PSC. While rules are not yet in place, governmental agencies offering
wastewater services must file data with the Commission regarding its service areas.
Contact: Kevin Neilson at (302) 739-4247.
No response required.
Delaware State Housing Authority – Contact Jimmy Atkins 739-4263
The proposal is to develop 620 units on 272 acres between West North Street and New
Burton Road on the west side of Dover. According to the State Strategies for Policies and
Spending, the proposal is located in Investment Level Areas 1 and 2. DSHA supports this
proposal because it is located in an area where the state is encouraging compact, mixed
use, and superior design. Furthermore, the proposal builds upon the State’s Livable
Delaware initiative and targets first time homebuyers. The provision of this type of unit
will help address the need for affordable homeownership opportunities identified in the
2003 Statewide Housing Needs Assessment.
A mixture of all unit types are planned for the development, from large single-family to
apartments above retail.
Delaware Emergency Management Agency – Contact Don Knox 659-3362
No comment.
No response required.
Department of Education – Contact Nick Vacirca 739-4658
No comment.
No response required.
Page 18 of 19
Página 78
If you should have any questions regarding the responses provided, please contact me
directly.
Sincerely,
BECKER MORGAN GROUP, INC.
Gregory V. Moore, P.E.
Vice President
GVM/rlh
cc: Mr. Bill Hughes, Limestone Medical Center
Mr. Thomas E. Mulhern, MBA Limestone Medical Center
Mr. Robert L. Thomas, Esq., Young Conaway Stargate & Taylor
Mr. Daniel L. Scheller, Eden Hill Farm, Inc.
Mr. Edmond P. Horsey, Eden Hill Farm, Inc.
Mr. James McGinnis, McGinnis Realty
Mr. Leonard Iacono, Daisy Construction Company
Mr. Mark Dunkle, Parkowski Guerke & Swayze
Mr. Mattew T. Spong, ASLA, RLA, Landscape Architectural Services
Mr. Michael C. Selvaggio, GRI, CRS, Patterson Swartz
Mr. Sean Mace, Dover Medical Properties, LLC
Mr. Thomas P. Barnett, MD, Dover Medical Properties, LLC
Miss. Dawn Melson, City of Dover.
Mr. Jim Galvin, City of Dover
Enclosure: Revised Master Plan
199905304ho-comments.doc
Page 19 of 19
Página 79
EXCERPT FROM
CITY OF DOVER PLANNING COMMISSION
June 20, 2005
(Note: The following minutes were completed using notes only
due to technical difficulties with recording equipment)
Z-05-03 Lands of Eden Hill Farm, Inc. at 834 West North Street – Rezoning from
IPM and A to TND – Public Hearing and Review for recommendation on the rezoning
application of Lands of Eden Hill Farm, Inc. for three (3) parcels consisting of 272.04
acres +/- of land. The properties are currently zoned IPM (Industrial Park
Manufacturing) and A (Agriculture). The proposed zoning classification is TND
(Traditional Neighborhood Design). The subject parcels are located on the south side of
West North Street and west of the railroad corridor and West Street. The owners of
record are Eden Hill Farm, Inc., and the State of Delaware. The equitable owners are
Investment Properties Associates, LLC and Dover Medical Properties, LLC.
Representatives: Mr. Gregg Moore, Becker Morgan Group, Inc.; and Mrs. Deb
Scheller, Representing the family (Eden Hill Farm, Inc.).
Ms. Melson stated that the intent of the Traditional Neighborhood Design (TND) zone is
to create a walkable and pedestrian-friendly, economically viable professional,
commercial, and mixed use residential neighborhood for people of different ages and
incomes that draws from the best architectural and community design features of
Delaware and the Delmarva Peninsula from its colonial past to the mid 20th century. The
TND zone intends to encourage greater integration of land-uses and diversity of lot sizes
than is permitted under other provisions of the Land Subdivision Regulations and Zoning
Ordinance of the City of Dover.
Ms. Melson further stated that the General Overall Master Plan consists of a set of maps
composed of plans of existing natural features showing topography, soils, drainage
vegetation and potential limitations to development, plans of the proposed building areas,
streets, roads, parking, open space and stormwater management and the overall program
of uses including showing general use location, proposed building height, and total gross
square feet by use.
Ms. Melson further stated that the TND code provisions provide for the opportunity to
submit separate Implementation Plans by individual use districts (Residential,
Commercial or Office). The review of the Implementation Plan is the second step in the
TND procedure. The Planning Commission reviews the TND Implementation Plan(s) for
compliance with the approved General Overall Master Plan. However, in order to
separate the Implementation Plan submissions additional information is required at the
time of Rezoning and General Master Plan review. To request such consideration, the
submission of the General Overall Master Plan shall include more detail of the design
elements of the project, including, but not limited to, architectural standards, design
relationships between uses and different scales of buildings, parking and open spaces, and
Página 80
an explanation of how the segregated Implementation Plan will conform to the intent of
the approved General Overall Master Plan.
Ms. Melson further stated that the area to be considered for rezoning is located on the
south side of West North Street between the railroad corridor and the intersection of West
North Street with Saulsbury Road. The land to the west of the subject property is zoned
IPM (Institutional Park Manufacturing Zone) and includes Kraft-General Foods facility
and other large industrial facilities. To the north across West North Street is the
residential area known as Lincoln Park. It is zoned RG-1 (General Residence Zone) and
primarily consists of single family dwellings with some multi-family development. The
northwest and east of the subject site adjacent to the railroad corridor are properties zoned
IO (Institutional and Office Zone), C-3 (Service Commercial Zone), and C-1A (Limited
Commercial Zone). This area includes the area targeted for redevelopment as part of the
West Side Redevelopment Plan and existing office buildings, a court building, the Dover
Police Station, service establishments, and retail establishments. To the southeast across
the railroad corridor and New Burton Road are the residential areas zoned R-8 and R-10
(One Family Residence Zones) known as Sherwood, Woodbrook, and Crossgates. The
Puncheon Run is just south of the subject area and further to the south are agricultural
lands currently zoned R-20 (One Family Residence Zone).
Ms. Melson further stated that the Land Development Plan Map of the Comprehensive
Plan as amended shows this area as Mixed Use. Mixed Use land use category is
described and includes information on the Eden Hill Farm property specifically. The
Plan recognized the potential opportunity for development with a mixed use focus. A
series of goals were outlined including: encouraging the creation of neighborhood centers
with mixed use development; pedestrian friendly public environments and opportunities
for connections to future transit; clustering of activities in walkable distance; and
development design ideas for building and parking locations.
Ms. Melson further stated that the Traditional Neighborhood Design Rezoning
Application/Master Plan application was reviewed during December 2004 by the
Preliminary Land Use Services as required by the City of Dover’s Memorandum of
Understanding (MOU). This MOU requires certain types of projects complete the PLUS
Review process prior to application submission. The applicant has submitted a letter
dated June 6, 2005 in response to the PLUS comments. Staff notes that some areas of the
Master Plan have been further revised since the Draft Master Plan was submitted for the
PLUS review; however, the overall concept of the Master Plan remains the same.
Ms. Melson further stated that the land area must meet certain eligibility requirements to
be rezoned to Traditional Neighborhood Design (TND). The review of these criteria for
the subject application is first, the land shall have access to an existing or planned arterial
or collector road. The land area has access from West North Street and the proposed
continuation of Saulsbury Road. Saulsbury Road and portions of West Street are
considered minor arterials and part of North Street is a collector road. Second, the land
area shall be served by adequate existing or planned infrastructure. Utilities such as
water and sewer are in the vicinity of this land area. The proposed project will build
Página 81
additional infrastructure as required. This is subject to the Department of Public Works
review. Third, the land area may contain single or multiple parcels. The rezoning
application for the land area shall be filed jointly by all owners of the involved land area.
The land area consists of three parcels of land totaling 272.04 acres. All current property
owners and equitable owners are participating in the application submissions. And
fourth, a finding by the Planning Commission and City Council that the proposed TND
location is generally consistent with the Comprehensive Plan. The City Council public
hearing after tonight’s hearing will be held on July 11, 2005. The Land Development
Plan of the Comprehensive Plan Update 2003 identifies these land areas with the land use
category of mixed use.
Ms. Melson further stated that the types of permitted uses within the Traditional
Neighborhood Design Zone are listed with the DAC Report provided.
Ms. Melson further stated that the General Overall Master Plan consists of a set of plan
maps (Parcel Plan sheet and Master Plan sheet in color) showing: existing natural
features, proposed building areas, location of streets/roads, parking options, location of
open space, and stormwater management areas. The overall program of uses is
identified. Additional information on these topics is also included in the Master
Standards Manual (Pattern Book) document.
Ms. Melson further stated that the Eden Hill Farm TND Master Plan identifies
development areas as a Residential District, Neighborhood Commercial District (with the
opportunity for residential uses), and Professional Office, Medical, and Financial District.
The residential district includes a total of 665 residential units in the form of single
family detached houses, single family detached houses with carriage houses (second
dwelling unit on lot), duplex units, townhouses, and condominium buildings.
Ms. Melson further stated that the Neighborhood Commercial District area located in the
northwest corner of the site consists of a variety of building forms with provisions for a
grocery store, drug store with drive thru, bank with drive-thru, retail and office buildings.
Several buildings also provide the option for residential uses on the upper floors. A
portion of this Commercial District is focused on a “Main Street: which connects to the
existing street network at West North Street and also links to the internal street network
and pedestrian network.
Ms. Melson further stated that the Professional Office, Medical and Financial District
area is located in the northwest portion of the site and consists of a series of multi-story
office buildings. A portion of this office district is focused on a “Main Street” which
connects to the existing street network at West North Street as a continuation of Clarence
Street.
Ms. Melson further stated that the overall site exceeds the minimum of 25% open space
by creating a community walking trail area, parks, and greens throughout the site and
large open space/park area in the southwest portion of the site. The existing historic
house of Eden Hill Farm and its tree allees (entrance drives) are preserved within a large
Página 82
public open space area.
Ms. Melson further stated that the Master Comprehensive Development Standards
Manual consists of a brief written and graphic description of the owner/developer’s
proposed approach to items of the site development. An addendum highlights some
revisions and clarifications to the Pattern Book dated May 6, 2005. The Pattern Book
presents information on the overall plan, typical urban spaces, and individual buildings.
Ms. Melson further stated that the Planning Staff recommends that the rezoning from
IPM (Industrial Park Manufacturing zone) and A (Agriculture zone) to TND (Traditional
Neighborhood Design zone) be approved. Some items identified for clarification in
future Implementation Plan submissions includes identifying the dedication intention for
the public streets and to finalize street names; identifying the public streets and private
circulation systems within Neighborhood Commercial district and Professional Office
district; providing the phasing of each development district and associated elements such
as street network, building sites, parking areas, stormwater management and open space
and clarifying the Administration of the Design Elements including the associated
responsibilities and procedures.
Ms. Melson stated that other agencies commenting included the Public Works
Department who stated that future plans must designate which public areas are to be
maintained by the City of Dover which includes parks, open space and right-of-ways.
The Plan must clearly designate as to which streets are to be dedicated to the City and
which streets are to be dedicated to the State. The Fire Marshal’s Office addressed access
to roadways during construction and water supply for fire protection that must be made
available as soon as combustible materials accumulate. The Electric Department and
DelDOT had no objections to the application.
Mr. Moore at this time presented a Power Point presentation of the site. This site will
consist of a professional office, residential, and commercial areas. The commercial street
that will be known as Lloyd Street in the Commercial office area will house retail on the
first floor with offices and residences on the second floor. In the Professional area, they
used elements of vernacular architecture for large buildings; similar to those used at
Wilmington Trust, Wesley College and Wilmington College. The residential area will
also house a community center with a bicycle trail that will be located adjacent to the
railroad. A community walking path system is located in the development connecting all
public spaces.
Statements of “awesome”, “exception package”, and “we are overwhelmed” were made
by various Planning Commission members.
Mr. Nichols stated that they have spent a lot of time in developing this site plan and while
he hates to see farmland disappearing he feels that this is a good plan. The existing drive
that comes off of North Street, will it be abandoned? Responding to Mr. Nichols, Mr.
Moore stated that the drive will be abandoned. The area will be maintained as a park
consisting of thirty (30) acres. The tree lines will also be maintained.
Página 83
Mr. Nichols further questioned the grade crossing at Water Street? Responding to Mr.
Nichols, Mr. Moore explained that DelDOT is pursuing the crossing. Mr. Nichols
questioned if there is only two entrances. Responding to Mr. Nichols, Mr. Moore stated
there would be more than two entrances: one on Water Street, Lloyd Street, and Clarence
Street extension, which would extend from North Street into the development and the
extension of Saulsbury Road.
Mr. Holt stated commented that he liked the building architecture but questioned how to
hold each building to those standards and what would be the sequence of construction.
Mr. Galvin stated that the sequence of the construction would be identified in the
Implementation Plans.
Mr. Holt further questioned the status of the new extension of Saulsbury Road and the
West Dover Connector. Responding to Mr. Holt, Mr. Galvin noted that this project can
continue without a decision being made on the West Dover Connector.
Mr. Holt asked is a rail station was planned for this community? Responding to Mr.
Holt, Mr. Galvin noted that the City would be participating in a DelDOT committee
studying the George and Lynch site for multi-model transportation options.
Mr. Friedman opened a public hearing.
Mrs. Carol Jason - 833 West North Street – Stated that she lives directly across from
the Eden Hill Farm entrance and she has to wait to turn into her driveway for people who
want to turn to go up the driveway to the greenhouse now. This is an industrial area all
the way over to the railroad tracks and into the downtown Dover area. Traffic in this area
currently concerns her. Will Saulsbury Road extension be completed prior to the end of
construction and what will be done for people living on North Street and traffic going up
this alley?
Responding to Mrs. Jason, Mr. Moore stated that the current entry into this site would be
closed and the house area and park would then be accessed by interior streets only.
Mrs. Sandy Kinkus – 365 Fiddlers Green – Stated that she is a resident of Crossgates
and is worried about the existing neighborhoods. They do not want to be compromised
and stormwater management is a big concern along the Puncheon Run. She would also
like to know how services such as the park would be accessible and how the park would
be utilized by surrounding neighborhoods. She also questioned the width of the streets
and if they would be wide enough for accessibility for newer fire trucks that would be
wider?
Responding to Mrs. Kinkus, Mr. Galvin stated that the widths of streets vary in the draft
Pattern Book and are in line with the street width regulations that were passed by City
Council in February 2005.
Página 84
Mrs. Janice Sibbald – 144 Blue Beach Drive – Stated that she feels that this is a
beautiful concept plan. She stated that as part of the plan there was to be a connection to
Schutte Park and the connecting neighborhoods, this was not shown as part of the plan.
Responding to Mrs. Sibbald, Mr. Galvin stated that the underpass (part of the path
connection) is a part of Capital Improvements project and they are waiting on the West
Dover Connector or other mechanisms for this connection.
Mrs. Sibbald further questioned who the community center would be for and who would
use it? Who would pay and maintain this center? Responding to Mrs. Sibbald, Mr.
Moore stated that the community center would be paid for by the developer for the
residential area within the development. The bike path connection is anticipated as part
of an eighty (80) acre open space area that will eventually connect into Schutte Park.
Mrs. Sibbald further questioned with regards to the park area center, what type of parking
would be made available? Responding to Mrs. Sibbald, Mr. Moore stated that parallel
parking on street would be available throughout this area.
Mrs. Carol Jason – 833 West North Street (Additional Question) – Questioned if they
would see the back of the buildings along with dumpsters from North Street?
Responding to Mrs. Jason, Mr. Moore stated that as you proceed down North Street you
would only see the front or sides of the buildings not the back of the buildings. The only
objectionable area is the rear of the supermarket but it would face North Street and the
rear is screened by fencing and landscaping.
Mrs. Cheryl PreCourt – 260 Kesselring Avenue – Stated that she lives in the Mayfair
subdivision and thinks that this is a great idea. She is; however, concerned with the West
Dover Connector and feels that they need to be involved with this process as this will
significantly increase traffic in their neighborhood.
Mr. Friedman closed the public hearing seeing no one else wishing to speak.
Mr. von Reider moved to recommend approval of Z-05-03 Lands of Eden Hill Farm, Inc.
at 834 West North Street, Rezoning from IPM and A to TND to City Council and accept
the General Mast Plan with all DAC comments, seconded by Colonel Welsh and the
motion was unanimously carried.
Página 85
NOTICE
Please note that the corresponding maps
and the Eden Hill Farms Pattern Book
are available for review in the
City Clerk’s Office.
I apologize for any inconvenience. Please contact the City Clerk’s Office at
736-7008 should you have any questions.
Janice C. Green
City Clerk
Página 86
FINAL READING
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL
MET:
AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY LOCATED
AT 834 WEST NORTH STREET
WHEREAS, the City of Dover has enacted a zoning ordinance regulating the use of property within
the limits of the City of Dover; and
WHEREAS, it is deemed in the best interest of zoning and planning to change the permitted use of
property described below from IPM (Industrial Park Manufacturing Zone) and A (Agriculture Zone)
to TND (Traditional Neighborhood Design Zone)
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF
DOVER, IN COUNCIL MET:
1. That from and after the passage and approval of this ordinance the Zoning Map and Zoning
Ordinance of the City of Dover have been amended by changing the zoning designation from
IPM (Industrial Park Manufacturing Zone) and A (Agriculture Zone) to TND (Traditional
Neighborhood Design Zone) on that property located at 834 West North Street, owned by
Eden Hill Farm, Inc.
ADOPTED: *
S:\ClerksOffice\Rezonings\2005\834 W North Street - Eden Hill Farm\Ordinance - Final Reading - 834 W North Street - Eden Hill Farm.wpd
Página 87
UTILITY COMMITTEE
The Utility Committee Meeting was held on June 27, 2005, at 3:30 p.m. with Chairman Carey
presiding. Members present were Mr. Sadusky, Mr. Cregar, and Mr. Snaman. Mr. Ruane was
absent. Mr. Hogan and Mayor Speed were also present.
AGENDA ADDITIONS/DELETIONS
Mr. Sadusky moved for approval of the agenda, seconded by Mr. Snaman and unanimously
carried.
Street Waiver Request (Length of Dead-End/Cul-de-Sac Street) - Somerset Park Subdivision
In accordance with Appendix A, Article VI, Section A15 of the Land Subdivision Regulations,
a street waiver request was received from Delta Acquisitions on McKee Road, LLC, for property
located on the west side of McKee Road, west of the McKee Road and Scarborough Road
intersection, known as the Somerset Park Subdivision. The applicants have requested a waiver
of 271 feet from the maximum length of a dead-end/cul-de-sac street (400 feet) to permit the
construction of a 671 foot cul-de-sac street, since the shape of the property would not provide
room for an additional road on the site.
The Planning Commission recommended approval of the requested waiver from the maximum 400
feet length of a dead-end (cul-de-sac) street to allow for a street of 671 feet in length. Mr. Galvin,
Director of Planning and Inspections, advised members that the Planning Commission recognized
the design limitations of the width of the development parcel; however, they encouraged the
applicant to work with the Department of Public Works to determine the location of a designated
right-of-way in order to provide the opportunity for interconnection to the adjacent parcel south
of this property.
Mr. Cregar moved to recommend approval of the requested street waiver to allow for a 671
foot cul-de-sac street for the Somerset Park Subdivision, stipulating that the developers work
with the City on providing an interconnection to the adjacent parcel south of this property.
The motion was seconded by Mr. Sadusky and unanimously carried.
Annexation Request - Lands of Clifton & Marie Hutton - Kenton Road and Foxhall Drive
Members reviewed a request for annexation of three (3) parcels of land located near the
intersection of Foxhall Drive and Kenton Road, owned by Clifton and Marie Hutton, with a
zoning classification of RG-3 (Group Housing). The Department of Public Works has determined
that the City does have the ability to provide utilities sufficient for the proposed uses.
Mr. Galvin, Director of Planning and Inspections, indicated that if approved, the annexation
request will be considered by the Planning Commission on July 18, 2005 and that the referendum
and public hearing before City Council would be scheduled.
Mr. Cregar noted that although the requested zoning classification is similar to those to the south
of the property, it is significantly more dense than the properties to the north and west. He
relayed concern with the impact the requested zoning classification could have for this area.
Página 88
UTILITY COMMITTEE MEETING
OF JUNE 27, 2005 PAGE 2
Mr. Snaman moved to recommend that the City move forward with the consideration of the
annexation request for three (3) parcels located near the intersection of Foxhall Drive and
Kenton Road (Attachment #1 - Resolution Setting Annexation Referendum for August 11, 2005).
The motion was seconded by Mr. Sadusky and carried with Mr. Cregar voting no. City Clerk’s
Office Note: It should be noted that consideration of an annexation request by the committee is to consider
infrastructure issues and the ability to provide city services; therefore, approval of the committee’s
recommendation does not annex said property. Final action on this annexation request will take place
during the Council Meeting of August 22, 2005.
Annexation Request - Lands of Traci A. McDowell and Craig L. Gahm - 80 Nixon Lane
Members reviewed a request for annexation of property located at 80 Nixon Lane, owned by Traci
A. McDowell and Craig L. Gahm, with a zoning classification of R-8 (Single Family Residence).
It was noted that the original request was for a zoning classification of R-20 (One Family
Residential). The Department of Public Works has determined that the City does have the ability
to provide utilities sufficient for the proposed uses.
Mr. Galvin, Director of Planning and Inspections, indicated that if approved, the annexation request
will be considered by the Planning Commission on July 18, 2005 and that the referendum and public
hearing before City Council would be scheduled.
Mr. Snaman moved to recommend that the City move forward with the consideration of the
annexation request for property located at 80 Nixon Lane (Attachment #2 - Resolution Setting
Annexation Referendum for August 11, 2005). The motion was seconded by Mr. Sadusky and
unanimously carried. City Clerk’s Office Note: It should be noted that consideration of an annexation
request by the committee is to consider infrastructure issues and the ability to provide city services;
therefore, approval of the committee’s recommendation does not annex said property. Final action on this
annexation request will take place during the Council Meeting of August 22, 2005.
Staff Report - Alternative Fuels
During the Regular Council Meeting of January 10, 2005, members accepted the Utility Committee’s
recommendation directing the City Manager to investigate the use of alternative fuels and fuel
vehicles. Mr. DePrima, City Manager, provided members the following information:
1) The City has purchased its first hybrid vehicle, and it has been assigned to the City
Manager. The gas mileage is currently 25.6 miles per gallon. This is approximately
25% better than comparable models/makes of vehicles.
2) The current price differential between bio-diesel and regular diesel is only $.01. This
would amount to less than $1,000 difference in fuel costs citywide. There would also
be only a minor increase in cost for one or two additional oil filters per vehicle. We
have about 30 diesel trucks in our fleet. Switching to using bio-diesel fuel would reduce
air pollution from our vehicles, lessen dependence on foreign oil, support the
agricultural economy, and cause less maintenance on City vehicles. Based on this, I am
planning on switching to bio-diesel fuel.
Página 89
UTILITY COMMITTEE MEETING
OF JUNE 27, 2005 PAGE 3
3) Central Services staff has been directed to purchase flexible fuel vehicles when possible
if there is no extra cost. This may allow the City to use ethanol fuel if it is available in
the future.
4) Councilman Carey provided information to me on various tax incentives for alternative
fuels. There are no apparent incentives available to cities at this time.
Mr. Sadusky moved to recommend that the City Manager be authorized to move forward with
the purchase of alternative fuel vehicles, seconded by Mr. Snaman and unanimously carried.
Mr. Snaman moved to recess, seconded by Mr. Sadusky and unanimously carried.
Meeting recessed at 4:20 p.m. and reconvened at 5:30 p.m.
Mr. Snaman moved to recess into executive session for legal matters, seconded by Mr. Sadusky
and unanimously carried.
Meeting recessed into executive session at 5:32 p.m. and reconvened at 7:12 p.m.
Mr. Sadusky moved for adjournment, seconded by Mr. Cregar and unanimously carried.
Meeting Adjourned at 7:12 P.M.
Respectfully submitted,
Carleton E. Carey, Sr.
Chairman
CEC/jg
S:\ClerksOffice\Agendas&Minutes\Committee-Minutes\2005\06-27-2005 Utility.wpd
Attachments
Attachment #1 - Annexation Resolution - Foxhall Drive
Attachment #2 - Annexation Resolution - 80 Nixon Lane
Página 90
ATTACHMENT #1
Utility minutes of 06/27/2005
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:
A RESOLUTION PROPOSING THE INCLUSION OF AN AREA WITHIN THE LIMITS OF THE CITY
OF DOVER AND CALLING FOR A SPECIAL ELECTION TO BE HELD IN THE SAID AREA.
WHEREAS, the Charter of the City of Dover authorizes Council to extend the boundaries of the said City
after a special election of the qualified voters and real estate owners of the territory proposed to be annexed,
and
WHEREAS, the Mayor and Council of the City of Dover deem it in the best interest of the City of Dover
to include an area located on the northwest corner of Kenton Road and Fox Hall Drive and on the south side
of Fox Hall Drvie adjacent to Kenton Road, which is contiguous to the present City limits, into the limits
of the City of Dover and within a zoning classification as recommended by the City of Dover Planning
Commission.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER,
IN COUNCIL MET:
1. That a special election be held for an area located on the northwest corner of Kenton Road and Fox Hall
Drive on the south side of Fox Hall Drive adjacent to Kenton Road, situated in East Dover Hundred, Kent
County, State of Delaware.
2. That the election be held on the 11th day of August, 2005 commencing at the hours of 11:00 a.m. in the
City Hall Annex, 15 E. Loockerman Street, Dover, Delaware, for the purpose of submitting the question of
annexation of the above area to those persons entitled to vote thereon.
3. That the election be held and conducted pursuant to the provisions of the Charter of the City of Dover
as amended.
4. That this resolution be published in accordance with the City of Dover Charter.
ADOPTED: *
S:\ClerksOffice\Attachments and Exhibits\Committee Attachments\2005\06-27-2005 Utility - Att 1 - Fox Hall Drive Resolution.wpd
Página 91
ATTACHMENT #2
Utility minutes of 06/27/2005
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:
A RESOLUTION PROPOSING THE INCLUSION OF AN AREA WITHIN THE LIMITS OF THE CITY
OF DOVER AND CALLING FOR A SPECIAL ELECTION TO BE HELD IN THE SAID AREA.
WHEREAS, the Charter of the City of Dover authorizes Council to extend the boundaries of the said City
after a special election of the qualified voters and real estate owners of the territory proposed to be annexed,
and
WHEREAS, the Mayor and Council of the City of Dover deem it in the best interest of the City of Dover
to include an area located at 80 Nixon Lane, which is contiguous to the present City limits, into the limits
of the City of Dover and within a zoning classification as recommended by the City of Dover Planning
Commission.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER,
IN COUNCIL MET:
1. That a special election be held for an area located at 80 Nixon Lane situated in East Dover Hundred, Kent
County, State of Delaware.
2. That the election be held on the 11th day of August, 2005 commencing at the hours of 11:00 a.m. in the
City Hall Annex, 15 E. Loockerman Street, Dover, Delaware, for the purpose of submitting the question of
annexation of the above area to those persons entitled to vote thereon.
3. That the election be held and conducted pursuant to the provisions of the Charter of the City of Dover
as amended.
4. That this resolution be published in accordance with the City of Dover Charter.
ADOPTED: *
S:\ClerksOffice\Attachments and Exhibits\Committee Attachments\2005\06-27-2005 Utility - Att 2 - 80 Nixon Lane Resolution.wpd
Página 92
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
The Safety Advisory and Transportation Committee Meeting was held on June 28, 2005, at 6:33 p.m.
with Chairman Hogan presiding. Members present were Mr. Carey, Mr. Link, and Mr. Lakeman.
Mr. Ritter was absent.
AGENDA ADDITIONS/DELETIONS
Mr. Carey moved for approval of the agenda, seconded by Mr. Link and unanimously carried.
Consideration of Proposed Ordinance Amendment - Chapter 13, Motor Vehicles and Traffic -
Section 13-30.2, Vehicle Parking Limited Where Carrying Capacity is in Excess of One Ton,
and Trailer and Motor Home Parking
During their meeting of May 24, 2005, members of the committee considered the proposed
amendment to Chapter 13, Motor Vehicles and Traffic, and, after much discussion, deferred the
matter until the next meeting in order to allow Mr. Galvin, Director or Planning and Inspections,
an opportunity to revise the proposed amendment to Section 13-30.2(d) to include a provision for
motor homes.
Mr. Galvin presented the proposed ordinance and recommended the addition of a new section (f)
related to parking based on street size. After noting the changes, Mr. Galvin advised members that
Chief Horvath, Dover Police Department, and Chief Bashista, Robbins Hose Company, are in
agreement with the proposed amendment.
Mr. Link moved to recommend adoption of the ordinance with the recommended changes
(Attachm ent #1) , seconded by Mr. Lakeman and unanimously carried.
Briefing on DelDOT Projects - Gary Laing
The briefing on DelDOT Projects by was postponed due to the absence of Mr. Laing. Mr. Hogan
recommended that this item be placed on the agenda for the next meeting.
Mr. Carey moved for adjournment, seconded by Mr. Lakeman and unanimously carried.
Meeting Adjourned at 7:01 P.M.
Respectfully submitted,
Kenneth L. Hogan
Chairman
KLH/rm
S:\ClerksOffice\Agendas&Minutes\Committee-Minutes\2005\06-28-2005 SA&T.wpd
Attachments Attached to Original Minutes and File Copy:
Attachment #1 - Chapter 13, Section 13-30.2 - Vehicle Parking
Página 93
ATTACHMENT #1
SA&T minutes of 06/28/2005
SA&T Committee -05-24-2005-1
Sec. 13-30.2. Vehicle parking limited where carrying capacity is in excess of one ton, and
trailer and motor home parking of the Dover Code be amended by deleting the RED
STRIKEOUTS text and inserting the text in BLUE ITALICS as follows:
(a) It shall be unlawful for any person to park any vehicle with a carrying capacity of
more than one (1) ton, any trailer which includes but is not limited to boat, utility,
construction or one that is used to carry goods regardless of weight capacity and is
designed to be towed or pulled by another vehicle, or any vehicle or trailer on the City of
Dover streets for a period longer than two (2) consecutive hours.
(b) It shall be unlawful for any person to park any commercial vehicle with a carrying
capacity of more than one (1) ton, any trailer which includes but is not limited to boat,
utility, construction or one that is used to carry goods regardless of weight capacity and is
designed to be towed or pulled by another vehicle, or any vehicle or trailer combination
thereof, or any motor home or travel trailer in any residential zone in the city except for
temporary parking for immediate deliveries, pickups, and/or service calls to residences or
for construction work on residential properties. A commercial vehicle shall be one which
is used or maintained for the transportation of persons or property for hire, compensation
or profit, except taxicabs.
(c) It shall be unlawful for any person to park a trailered boat under twenty-five (25) feet
on the streets of Dover for a period longer than twelve (12) consecutive hours. For any
trailered boat twenty-five (25) or greater, refer to Section 13.30.2(a). (amended at the
Safety Advisory and Transportation Committee of May 24, 2005)
(d) It shall be unlawful for any motor home to park on any residential street for a
period longer than twelve consecutive hours without a permit. A resident owner of a
motor home may request a parking permit from the City of Dover to park on a residential
street in the vicinity of their residence for a period not to exceed 72 hours. The permit
would be made available at no cost to the resident. The parking permit shall be
displayed in the front window of the vehicle visible from the street. A resident may only
request such a permit three times in any twelve month period.
(e) Nonresidents are exempt from subsection (d) for a period of up to seven (7) days as
long as their motor home or travel trailer does not create a safety hazard or interfere with
traffic in the residential area that they are parked in.
(f) All parking allowed in this section only applies to streets that can accommodate
parking in compliance with Appendix A, Article VI, Section A.
(The alternative to (e) would be to require a parking permit for non-residents as well to
park any longer than 12 hours.)
Página 94
SYNOPSIS
Original Amendment
This proposed amendment would extend the time
limit for parking boat trailers from 2 hours to 12
consecutive hours. (SPONSORS: C OU NC IL M EM BER S
C AR EY , S LA VIN , A N D W ILLIA M S )
Supplemental Am endment
This proposed amendm ent would extend the time limit for parking motor homes from 2
hours to 12 consecutive hours. (S TAFF P ROPOSAL )
Página 95
ACTION FORM
PROCEEDING: Council AGENDA ITEM NO.: 7/11/05 - 7
DEPARTMENT OF ORIGIN: Electric Department DATE SUBMITTED: 6/29/05
PREPARED BY: Richard Gardner, Line Crew Foreman
SUBJECT: Electric Pole Testing Contract
REFERENCE: N/A
RELATED PROJECT: N/A
APPROVALS: City Manager and Finance Director
EXHIBITS: N/A
EXPENDITURE ESTIMATED: $ 28,624.70 per year AMOUNT BUDGETED: See Funding Source
FUNDING SOURCE (Dept/Page in CIP & Budget): 2005-2006 Operating Budget, Page 219, Acct. No.
480-8200-562-30.31 has $499,000 budgeted. This expense was estimated at $25,000 within the account. The
total budgeted amount will not be exceeded. This will be done by managing other expenses charged.
TIMETABLE: July 1, 2005 through July 1, 2008
RECOMMENDED ACTION: Staff recommends awarding the three (3) year contract to Osmose Utilities
Services, Inc.
BACKGROUND AND ANALYSIS
This is an ongoing maintenance program to treat and preserve wooden electric poles that make up the City’s electric
infrastructure. This maintenance program allows the Electric Department to target rotten poles and replace them prior to
jeopardizing the integrity of our electric system. To complete testing of all poles (transmission and distribution)
throughout the City requires a ten (10) year cycle; approximately 10% of the poles will be completed in a year’s time.
July 1, 2005 will begin the fourth (4th) year of this ten (10) year cycle.
This three (3) year contract was bid through the Purchasing Department.
City of Dover Pole Inspection and Treatments Contract Quotes
July 1, 2005 - July 1, 2008
Osmose Utilities
Estimate Per 3 Years U.P.T. Inc.
Services, Inc.
Required Test % Type of Estimated Quote 2005 Quote 2005
Testing Quantity Prices Estimate Prices Estimate
Excavate/Bore/Evaluate/In
ternal Treat/ External
Treat 33.00% 344 $29.60 $10,182.40 $36.64 $12,604.16
Sound and Bore 56.00% 584 $6.50 $3,796.00 $4.23 $2,470.32
Visual Inspection 9.00% 98 $4.00 $392.00 $3.33 $326.34
Internal Treat 1.60% 17 $12.95 $220.15 $9.59 $163.03
MITC Fumes Used 2399 $5.85 $14,034.15 $5.51 $13,218.49
Annual Estimated Cost $28,624.70 $28,782.34
Página 96
FIRST READING
AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY
LOCATED ON THE NORTHWEST CORNER OF KENTON ROAD AND FOXHALL
DRIVE AND ON THE SOUTH SIDE OF FOXHALL DRIVE ADJACENT TO KENTON
ROAD
WHEREAS, the City of Dover has enacted a zoning ordinance regulating the use of property
within the limits of the City of Dover; and
WHEREAS, it is deemed in the best interest of zoning and planning to change the permitted use
of property described below from RS-1 - Single Family Residential (Kent County Zoning
Classification) to RG-3 - Group Housing (City of Dover Zoning Classification)
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY
OF DOVER, IN COUNCIL MET:
1. That from and after the passage and approval of this ordinance the Zoning Map and
Zoning Ordinance of the City of Dover has been amended by changing the zoning designation
from RS-1 (Kent County zoning classification) to RG-3 (City of Dover zoning classification)
on that property located on the northwest corner of Kenton Road and Foxhall Drive and on the
south side of Foxhall Drive adjacent to Kenton Road, owned by Clifton and Marie Hutton.
ADOPTED: *
S:\ClerksOffice\Annexations\Annex-2005\98 Foxhall Drive\Rezoning Ordinance - First Reading.wpd
Página 97
FIRST READING
AN ORDINANCE AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTY
LOCATED AT 80 NIXON LANE
WHEREAS, the City of Dover has enacted a zoning ordinance regulating the use of property
within the limits of the City of Dover; and
WHEREAS, it is deemed in the best interest of zoning and planning to change the permitted use
of property described below from RS-1 - Single Family Residential (Kent County Zoning
Classification) to R-8 - One Family Residential (City of Dover Zoning Classification)
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY
OF DOVER, IN COUNCIL MET:
1. That from and after the passage and approval of this ordinance the Zoning Map and
Zoning Ordinance of the City of Dover has been amended by changing the zoning designation
from RS-1 - Single Family Residential (Kent County Zoning Classification) to R-8 - One
Family Residential (City of Dover Zoning Classification) on that property located at 80 Nixon
Lane, owned by Traci A. McDowell and Craig L. Gahm.
ADOPTED: *
S:\ClerksOffice\Annexations\Annex-2005\80 Nixon Lane\Rezoning Ordinance.wpd
Página 98
FIRST READING
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
COUNCIL MET:
That Sec. 13-30.2. Vehicle parking limited where carrying capacity is in excess of one
ton, and trailer and motor home parking of the Dover Code be amended by deleting the
RED STRIKEOUTS text and inserting the text in BLUE ITALICS as follows:
(a) It shall be unlawful for any person to park any vehicle with a carrying capacity of
more than one (1) ton, any trailer which includes but is not limited to boat, utility,
construction or one that is used to carry goods regardless of weight capacity and is
designed to be towed or pulled by another vehicle, or any vehicle or trailer on the City of
Dover streets for a period longer than two (2) consecutive hours.
(b) It shall be unlawful for any person to park any commercial vehicle with a carrying
capacity of more than one (1) ton, any trailer which includes but is not limited to boat,
utility, construction or one that is used to carry goods regardless of weight capacity and is
designed to be towed or pulled by another vehicle, or any vehicle or trailer combination
thereof, or any motor home or travel trailer in any residential zone in the city except for
temporary parking for immediate deliveries, pickups, and/or service calls to residences or
for construction work on residential properties. A commercial vehicle shall be one which
is used or maintained for the transportation of persons or property for hire, compensation
or profit, except taxicabs.
(c) It shall be unlawful for any person to park a trailered boat under twenty-five (25) feet
on the streets of Dover for a period longer than twelve (12) consecutive hours. For any
trailered boat twenty-five (25) or greater, refer to Section 13.30.2(a). (amended at the
Safety Advisory and Transportation Committee of May 24, 2005)
(d) It shall be unlawful for any motor home to park on any residential street for a
period longer than twelve consecutive hours without a permit. A resident owner of a
motor home may request a parking permit from the City of Dover to park on a residential
street in the vicinity of their residence for a period not to exceed 72 hours. The permit
would be made available at no cost to the resident. The parking permit shall be
displayed in the front window of the vehicle visible from the street. A resident may only
request such a permit three times in any twelve month period.
(e) Nonresidents are exempt from subsection (d) for a period of up to seven (7) days as
long as their motor home or travel trailer does not create a safety hazard or interfere with
traffic in the residential area that they are parked in.
(f) All parking allowed in this section only applies to streets that can accommodate
parking in compliance with Appendix A, Article VI, Section A.
Página 99
(The alternative to (e) would be to require a parking permit for non-residents as well to
park any longer than 12 hours.)
SYNOPSIS
Original Amendment
This proposed amendment would extend the time
limit for parking boat trailers from 2 hours to 12
consecutive hours. (SPONSORS: C OU NC IL M EM BER S
C AR EY , S LA VIN , A N D W ILLIA M S )
Supplemental Am endment
This proposed amendm ent would extend the time limit for parking motor homes from 2
hours to 12 consecutive hours. (S TAFF P ROPOSAL )