Página 1
CITY OF DOVER, DELAWARE
PLANNING COMMISSION
Monday, November 20, 2023 at 7:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
Written comments are accepted via mail to City of Dover – Planning Commission, P.O. Box 475 Dover
DE 19903 and via email at CompPlan@dover.de.us.
IN-PERSON and VIRTUAL MEETING NOTICE
The Planning Commission Meeting for November 20, 2023 will be held as an In-Person Meeting at City
Hall in City Council Chambers. The public is welcome to attend in person. The Meeting will also be
provided as a Virtual Meeting using WebEx, an audio/visual conferencing system as an electronic means
of communication. See participation information below to join by phone or computer.
PUBLIC PARTICIPATION INFORMATION
City of Dover Planning Commission Meeting of November 20, 2023
Join by Phone Dial: +1-650-479-3208
Access code: 253 091 87615 (Password: 3683772)
Join Online: https://bit.ly/PCMeeting11202023
Webinar Number: 2530 918 7615
Event password: Dover PC
If you are new to WebEx get the app now at https://www.webex.com/ to be ready when the meeting
starts. For problems accessing the meeting, please call the Planning Office at (302) 736-7196.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
Welcome to new Planning Commission Member as appointed October 23, 2023 for a Three Year
Term to Expire June 2026 representing District 1: Mark Reeves
ADOPTION OF AGENDA
APPROVAL OF MINUTES
1. Adoption of Minutes of October 16, 2023
1
Página 2
PLANNING COMMISSION - November 20, 2023 PAGE 2
COMMUNICATIONS & REPORTS
Meeting Reminder: The next Planning Commission regular meeting date December 18, 2023.
Update on City Council Actions
Department of Planning & Inspections Updates
Education and Training Opportunities
2. Advanced Land Use Law, Wednesday, December 20, 2023, 10:00 AM to 12:00 PM via
Zoom
Planning 101, Wednesday, January 17, 2024, 9:00 AM to 12:00 PM, Kent County Levy
Court Building
Projects and Studies Activity Updates
3. Update on C-2 Code Amendments Project for Potential Revisions to Zoning Ordinance for
C-2 (Central Commercial Zone)
OPENING REMARKS CONCERNING MEETING PROCEDURES FOR APPLICATIONS
OLD BUSINESS
Request for Extension of Planning Commission Approval
Pending Development Application:
4. S-23-19 Windward Ridge Apartments on West Denneys Road – Continued Review of a Site
Development Application for the construction of thirteen (13) garden style apartment
buildings consisting of eleven (11) buildings containing twenty-four (24) units and two (2)
buildings containing eighteen (18) units for a total of 300 apartment units. Also proposed are
twelve (12) garage buildings, a Club House with Pool, walking paths, parking, and other site
improvements. Two (2) existing single family detached dwellings will remain on separate
lots after a Minor Lot Line Adjustment Plan to reconfigure the three properties. The
properties are zoned RM-2 (Medium Density Residence Zone) and partially subject to the
SWPOZ (Source Water Protection Overlay Zone). The subject site consists of three parcels
totaling 40.12 acres +/- located on the north side of West Denneys Road and west of but not
adjacent to Carlisle Drive. The owners of record are George L. Craig Jr. and Deborah J.
Craig; Robert G. Keller and Gloria K. Keller; and Bruce A. Burkett and the equitable owner
is Jack Lingo Asset Management, LLC. Property Addresses: 57 Rocky Road, 4085 West
Denneys Road, and an unaddressed parcel on West Denneys Road. Tax Parcels: ED-05-
056.00-01-02.00-000, ED-05-056.00-01-03.00-000, and ED-056.00-01-04.00-000. Council
District 1. Review of Active Recreation Area. Waiver Requests: Partial Elimination of
Sidewalk and Subdivision Waiver of Requirement for Two Connections to Public Street. This
subject area was annexed with Application AX-22-03 Lands of Craig, Keller, and Burkett:
Annexation of Three Parcels on West Denneys Road. At the October 16, 2023 Meeting, the
Planning Commission conducted a Public Hearing and then deferred action on Application
S-23-19 seeking additional information.
2
Página 3
PLANNING COMMISSION - November 20, 2023 PAGE 3
NEW APPLICATIONS
5. C-23-02 Mt. Zion AME Church Building Addition at 101 North Queen Street (and 107 North
Queen Street) - Public Hearing and Review of a Conditional Use Site Plan for an addition
(1,402 SF footprint) to the Place of Worship (Church) building. The subject properties are
zoned RG-1 (General Residence Zone). The properties totaling 11,500 SF are located at the
northeast corner of N. Queen Street and Fulton Street. The owner of record for both parcels is
A.M.E. Church of Dover. Property Addresses: 101 N. Queen Street and 107 N. Queen Street.
Tax Parcels: ED-05-076.08-03-37.00-000 and ED-05-076.08-03-38.00-000. Council District 4.
The site was granted a variance to increase the area permitted to be covered by buildings
(Board of Adjustment Application V-23-04).
6. S-23-20 Cold Storage Warehouse at 451 Garrison Oak Drive - Public Hearing and Review of a
Site Development Plan for a 165,000 SF Warehouse with associated site improvements. The
site is located at Lot 8 of the Garrison Oak Business & Technology Park. The property is zoned
IPM-2 (Industrial Park Manufacturing Zone – Business and Technology Center) and partially
subject to the SWPOZ (Source Water Protection Overlay Zone: Tier 2 Primary Wellhead
Protection Area). The property of 11.53 acres is located on the south side Garrison Oak Drive.
The owner of record is the City of Dover; and the equitable owner is SLS Equity Partners.
Property Address: 451 Garrison Oak Drive. Tax Parcel: LC-05-068.00-02-08.00-000. Council
District 3. Waiver Requests: Partial Elimination of Upright Curbing and Reduction of Parking
Requirement. For Consideration: Performance Standards Review Application. The site was
granted two variances to reduce setbacks related to building height and to increase the
maximum lot coverage to 71% (Board of Adjustment Application V-23-05).
7. S-23-21 BHD Operations Facility at 250 Garrison Oak Drive - Public Hearing and Review of a
Site Development Plan for a 6,000 SF Office Building with 4,000 SF Truck Maintenance
Garage, parking and storage area for collection trucks and containers, a refueling station, and
with associated site improvements. The site is located at Lot 11 of the Garrison Oak Business
& Technology Park. The property is zoned IPM-2 (Industrial Park Manufacturing Zone –
Business and Technology Center). The property of 10.755 acres is located on the west side of
Garrison Oak Drive. The owner of record is Trash Gurls, Inc. Property Address: 250 Garrison
Oak Drive. Tax Parcel: LC-05-068.00-02-11.00-000. Council District 3. For Consideration:
Performance Standards Review Application.
NEW BUSINESS
ADJOURN
Posted Agenda: November 9, 2023
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO
29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION
OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE
TIME OF THE MEETING
3
Página 4
Item 1.
CITY OF DOVER PLANNING COMMISSION
OCTOBER 16, 2023
The Meeting of the City of Dover Planning Commission was held on Monday, October 16, 2023
at 7:00 PM as an In-Person Meeting and also using the phone/videoconferencing system WebEx.
The Meeting Session was conducted with Chair Mrs. Maucher presiding. Members present were
Mr. Cooper (virtual), Mr. Roach (virtual), Mrs. Denney, Mr. Hartman, Mr. Baldwin, Dr. Jones,
Mrs. Welsh (virtual), and Mrs. Maucher. Mrs. Malone has completed her service choosing not to
be reappointed. A new Commission member has not been appointed.
Staff members present were Mrs. Dawn Melson-Williams, Ms. Katherine Oehmke, Mr. Jason
Lyon (virtual), Mrs. Sharon Duca (virtual) and Mrs. Kristen Mullaney.
APPROVAL OF AGENDA
Dr. Jones moved to approve the Agenda as submitted, seconded by Mr. Baldwin and the motion
was carried 8-0.
APPROVAL OF MEETING MINUTES OF SEPTEMBER 18, 2023
Mr. Baldwin moved to approve the Planning Commission Meeting Minutes of September 18,
2023, seconded by Dr. Jones and the motion was unanimously carried 8-0.
COMMUNICATIONS & REPORTS
Mrs. Melson-Williams stated that the next Planning Commission regular meeting is scheduled
for Monday, November 20, 2023, at 7:00PM in the City Hall Council Chambers.
Mrs. Melson-Williams provided an update on the regular City Council and various Committee
meetings held on September 25 & 26, 2023 and October 9 & 10, 2023.
Mrs. Melson-Williams stated that we have had some Staff changes since the last meeting. Mr.
Julian Swierczek was a Planner II with the City of Dover. His last day with the City was October
6, 2023. Today he started his new career as a Planning Staff member with the City of Alexandria,
Virginia. We wish him the best. The second person that we are missing is Mrs. Mary Ellen Gray
who served as the City Planner and Director of the Department of Planning and Inspections.
Friday was her last day with the City of Dover. She is starting next week with the City of
Rehoboth as their Planning and Community Development Director. She does note that it was a
pleasure to serve and work with members of the Planning Commission. She is not moving
anywhere; she will still continue to reside in Camden, DE. So, you might see her in your travels.
She notes that she hopes that she was of value to both the Planning Commission and Staff during
her time here at the City and she wishes us the best and success in our endeavors at the City of
Dover in planning for its future. “Bear with us” is the key message coming out of the Planning
Office. They will do their best to serve. She will note that the City Manager’s Office is lending a
hand in that the Assistant City Manager, Sharon Duca is helping with the administration of our
overall Department. Ms. Duca has actually joined us online this evening to lend an ear and see
what fun we have at Planning Commission meetings.
Mrs. Melson-Williams stated that last week the Planning Staff held a series of meetings and a
1
4
Página 5
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
Workshop focused on the C-2 (Central Commercial Zone) code amendments. This is a project
that we are working on associated with the Transforming Downtown Dover Capital City 2030
Plan. We provided the Commission the highlights flyer. Basically with this, they have started to
look at the C-2 (Central Commercial Zone) in particular and have a series of potential concepts
for future text amendments. They will be reporting to City Council next week on those initial
concepts and hopefully moving forward with text writing of text amendments which will be a
package that will ultimately come forth to the Planning Commission for a formal review process.
We are in the concept stage. For those that may be listening or watching us this evening, from
that Workshop there is a memo that presents the summary and the PowerPoint. Some other
information is available on the City’s website if you find your way to the City Meetings Calendar
and take a look at the October 11, 2023 meeting which was the Walk-in Workshop that we
offered to the public.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the In-
Person Meeting and Virtual Meeting using the WebEx system.
OLD BUSINESS
Requests for Extensions of Planning Commission Approval:
C-21-07 Lands of First State Business Center, LLC: Two Buildings at 30 Lafferty Lane -
Request for a One-Year Extension of the Planning Commission Approval granted on November
15, 2021 of a Conditional Use Site Plan Application to permit the construction of two (2)
Warehouse Buildings with a combined size of 296,400 SF, a trailer parking area, and associated
site improvements. Building A is proposed at 132,600 SF and Building B is proposed at 163,800
SF. The property is zoned M (Manufacturing Zone) and is subject to the AEOZ (Airport
Environs Overlay Zone): Accident Potential Zone I (APZ I) and Noise Zone A. The property
consists of 30 acres and is located on the south side of Lafferty Lane between Bay Road and
Horsepond Road. The owner of record is First State Business Center, LLC and the equitable
owner is Jack Lingo Asset Management, LLC. Property Address: 30 Lafferty Lane. Tax Parcel
Number: ED-05-077.00-01-28.03-000. Council District 2. PLUS Review: #2021-08-04.
Approved Waiver Request: Partial Elimination of Sidewalk. Approved Performance Standards
Review Application. The Final Site Plan Approval was granted on April 25, 2023.
Representative: Mr. Doug Motley, Jack Lingo Asset Management
Mrs. Melson-Williams this is a Request for a One-Year Extension. The project was C-21-07
under the name of Lands of First State Business Center, LLC. It is a property out on the south
side of Lafferty Lane. It came to be more commonly known as the Dover Logistics Center. It
was a project for two warehouse buildings at that location. As noted, the Planning Commission
considered this and granted conditional approval back in November 2021. With that, that kicked
off the initial two years of eligibility for the project which would have it expiring the end of
November 2023. Earlier this year, the project did complete a Final Site Plan Approval process
that was granted in April 2023. They submitted a letter dated September 18, 2023 seeking this
Request for a One-Year Extension. They are continuing some review and coordination with the
2
5
Página 6
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
Dover Air Force Base due to proximity of the location to that facility.
Mr. Motley stated just to reiterate what Mrs. Melson-Williams said, this extension is kind of
necessary because some things came up post final approval as it relates to the Air Base and
concerns that they had with us coordinating some of the development activity. We are just asking
for some more time to work through that with the people at the Air Base.
Mrs. Maucher asked if they had an anticipated timeline for when the issues might be resolved.
Responding to Mrs. Maucher, Mr. Motley stated that he hopes that it is next week, but it could be
a lot longer. There are some complexities in working with the federal government that can take a
little bit of time.
Dr. Jones moved to approve C-21-07 Lands of First State Business Center, LLC: Two Buildings
at 30 Lafferty Lane for a one-year extension, seconded by Mrs. Denney and the motion was
carried 8-0 by roll call vote. Mr. Cooper voting yes. Mr. Roach voting yes. Mrs. Denney voting
yes; she thinks it’s appropriate. She has had times where she has had to work with the federal
government herself. Mr. Hartman voting yes; based on the need to coordinate with the Dover Air
Force Base. Mr. Baldwin voting yes. Dr. Jones voting yes; the applicant is moving along very
well. Mrs. Welsh voting yes; it is important to coordinate with the Air Force Base, so she is sure
that it’s appropriate. Mrs. Maucher voting yes; for reasons stated.
NEW APPLICATIONS
S-23-18 Delaware State University New Agriculture Building at 1200 N. Dupont Highway –
Public Hearing and Review of a Site Development Plan for a new one story 10,402 SF+/-
Building of offices and classrooms as the New Agriculture Building with the associated site
improvements. The project site will redevelop the existing baseball field area located on the
Delaware State University main campus. The property is zoned IO (Institutional and Office
Zone) and also subject to the SWPOZ (Source Water Protection Overlay Zone). Property
Address: 1200 N. Dupont Highway. Tax Parcels: ED-05-057.00-01-19.00-000, ED-05-057.00-
01-20.00-000, and portion of ED-05-057.00-01-21.00-000. Council District 4.
Representative: Mr. Mike Riemann, Becker Morgan Group; Mr. Khalid Zerrad, Delaware State
University
Ms. Oehmke stated that this application is a Site Development Plan for a new 10,402 SF
agriculture building on the Delaware State University campus at the site of the former baseball
field on the southwestern portion of the campus. It is at the intersection of University Drive and
Loop Road. It is zoned IO (Institutional and Office Zone) with a portion in the SWPOZ (Source
Water Protection Overlay Zone) Tier 3 – Excellent Recharge Area. The project area is 3.44
acres. It will house classrooms and offices. The plan outlines 31 additional parking spaces
including two handicapped with one van accessible. Both entrances to the parking lot are off
University Drive. There will be a sidewalk addition connecting the site to the rest of the campus
walking network. The building is one-story with mostly brick and metal panels with wood
paneling. It will be served by City of Dover water and sewer and DNREC overseeing the
Sediment and Stormwater Management Plan.
3
6
Página 7
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
Mr. Riemann stated that this is a new 10,402 SF building located in the vicinity of the existing
baseball field that is going to be replaced. On the rendering shown, you can see the site mainly in
green was the old baseball field that will be demolished. You can see the new building in a tan
color in the middle and then the associated parking that would serve the facility and fire lane
access, etc. The site gains access from internal streets within the campus so they don’t access out
to DelDOT streets. There will be landscaping; you can see the trees throughout in accordance
with the City’s landscape requirements. You can see a proposed stormwater management facility
located on the bottom part of the screen. There are lots of sidewalks throughout as is expected
throughout a campus. He believes that they provided the required bike parking in front of the
building that was a requirement of the City. They reviewed the Staff Report that was provided
and they don’t have any objections to the recommendations that were part of that Report. The
next slide shows the elevations. The front elevation is a mixture of materials. The next couple of
slides will show a perspective of what the other sides of the building will look like.
Mr. Hartman asked if there will be a dedicated chemical storage area in the building. Responding
to Mr. Hartman, Mr. Zerrad stated that he would think so. They are in the design development
phase right now; so, he is sure that they will have that in the floor plan.
Mr. Hartman stated that since there is a dedicated chemical storage area in this building, isn’t
that prohibited in the SWPOZ (Source Water Protection Overlay Zone)? Responding to Mr.
Hartman, Mr. Zerrad stated that there are not going to be any wet labs in the space. It is going to
be a demonstration kitchen for a lot of cooking.
Mr. Riemann stated that when you say “agriculture building”, understand that the space is a
combination of meeting spaces, multi-purpose rooms, some classrooms, some offices and a
demonstration kitchen. So any sort of chemicals that you might be thinking of are related to the
activities associated with a demonstration kitchen, not agricultural activities like farming. The
name of the project might be confusing because it is part of the agricultural department of the
school.
Mr. Hartman asked for an example of the chemicals associated with the kitchen. Responding to
Mr. Hartman, Mr. Zerrad stated that it will be no different than our personal homes; just
something to clean the equipment.
Dr. Jones asked if this building is very close to the other agricultural buildings? Responding to
Dr. Jones, Mr. Riemann stated that if you can picture the old baseball field that’s where it will be
located.
Mr. Zerrad stated that it’s within proximity to the next buildings.
Dr. Jones asked if they would be near the agricultural buildings. Responding to Dr. Jones, Mr.
Zerrad stated yes, they have several agricultural buildings. It is very close to the Washington
Building.
Dr. Jones stated that the design of this building’s flat roof seems to be very inconsistent with new
construction on the campus and so forth as she has seen it. Does the building have a flat roof
4
7
Página 8
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
line? Responding to Dr. Jones, Mr. Zerrad stated yes, it does have an EPDM roof. The prior
buildings all had flat roofs. The ECIC Building that they just brought to the Commission about a
month and a half ago has a flat roof.
Mrs. Maucher opened a public hearing and after seeing no one wishing to speak, closed the
public hearing.
Mr. Hartman stated that the applicant said in their presentation that they agreed with the Planning
Staff comments based in the DAC Report with the requirements in the Advisory Comments as
well, Section IX and Section XI of their DAC Report. Are those the comments that you agree to
accept? Responding to Mr. Hartman, Mr. Riemann stated yes.
Mr. Hartman moved to approve S-23-18 Delaware State University New Agriculture Building at
1200 N. Dupont Highway for a Site Development Plan for a new one-story building with offices
and classrooms at the new agricultural building with associated site improvements based on the
applicant’s acceptance of the Planning Staff’s recommendations in their DAC Report, seconded
by Dr. Jones and the motion was carried 8-0 by roll call vote. Mr. Hartman voting yes; based on
the motion. Mr. Baldwin voting yes. Dr. Jones voting yes. Mrs. Welsh voting. Mr. Cooper voting
yes. Mr. Roach voting yes. Mrs. Denney voting yes; she thinks it’s an excellent use for this
particular piece of ground. Mrs. Maucher voting yes; based on the DAC Report and Staff
recommendations.
S-23-19 Windward Ridge Apartments on West Denneys Road – Public Hearing and Review of a
Site Development Application for the construction of thirteen (13) garden style apartment
buildings consisting of eleven (11) buildings containing twenty-four (24) units and two (2)
buildings containing eighteen (18) units for a total of 300 apartment units. Also proposed are
twelve (12) garage buildings, a Club House with Pool, walking paths, parking, and other site
improvements. Two (2) existing single family detached dwellings will remain on separate lots
after a Minor Lot Line Adjustment Plan to reconfigure the three properties. The properties are
zoned RM-2 (Medium Density Residence Zone) and partially subject to the SWPOZ (Source
Water Protection Overlay Zone). The subject site consists of three parcels totaling 40.12 acres
+/- located on the north side of West Denneys Road and west of but not adjacent to Carlisle
Drive. The owners of record are George L. Craig Jr. and Deborah J. Craig; Robert G. Keller and
Gloria K. Keller; and Bruce A. Burkett and the equitable owner is Jack Lingo Asset
Management, LLC. Property Addresses: 57 Rocky Road, 4085 West Denneys Road, and an
unaddressed parcel on West Denneys Road. Tax Parcels: ED-05-056.00-01-02.00-000, ED-05-
056.00-01-03.00-000, and ED-056.00-01-04.00-000. Council District 1. Review of Active
Recreation Area. Waiver Requests: Partial Elimination of Sidewalk and Subdivision Waiver of
Requirement for Two Connections to Public Street. This subject area was annexed with
Application AX-22-03 Lands of Craig, Keller, and Burkett: Annexation of Three Parcels on West
Denneys Road.
Representative: Mr. Charlie Barnett, Morris & Ritchie Associates
Mrs. Melson-Williams stated that this is the application for Windward Ridge Apartments S-23-
19. It is a Site Development Plan and it does have a Minor Lot Line Adjustment Plan as part of it
and an Active Recreation Area Plan. It involves three tracts of land currently addressed as 57
5
8
Página 9
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
Rocky Road, 4085 West Denneys Road, and an unaddressed parcel adjacent to those also found
on the north side of West Denneys Road. The image shown on the screen is the plan for the
entire site. Denneys Road is at the lower right-hand corner. The property subject to development
is located west of Carlisle Village which is a single family residential subdivision that exists
already out there. However, Carlisle Village is not in the City of Dover. The three parcels that
make up this tract of just over forty (40) acres were annexed into the City of Dover with an
application from 2022 with final action in early January 2023. The property is zoned RM-2
(Medium Density Residence Zone) and is also subject to the SWPOZ (Source Water Protection
Overlay Zone). Their proposal is for an apartment complex of 300 units. It is spread across a
total of thirteen (13) buildings. The project also includes Garages and a Club House building
with a pool. Graphically, we see that these are three-story apartment buildings. There are a
couple of entry points to each building that are located off the parking area. The parking
surrounds the buildings. There is a circulation pattern throughout the development that loops
through it. There is one access point to the facility from West Denneys Road. With this, they are
meeting the City’s parking requirements for parking of apartment projects and that is a rate of
2.25 spaces per dwelling unit. They would require 675 parking spaces. Their project is currently
showing 724 parking spaces and those kind of flank the perimeter of the circulation drive. Also,
the spaces are found within the twelve garage buildings that are on the site. With the project,
there is the requirement for active recreation and their active recreation is proposed as a Club
House facility with a pool. That Active Recreation Plan was required to have a minimum of 1.9
acres of land or facilities, and they are proposing 2.24 acres. It is a mix of spaces within the Club
House. We can see that there is a variety of different spaces within that building to serve as yoga,
fitness, and a great room that has game tables and the like. There are also restroom facilities that
serve it and the adjacent pool area. Throughout the rest of the complex for active recreation, we
do see a tot lot playground, a series of walking trails through two of the wooded areas that will
remain on the project site, and the exercise and picnic area that is near the pool. There is also a
proposal for a dog park area off one of the walking trails. There is an Active Recreation Area
Report that focuses on the elements of active recreation. There were some Staff
Recommendations made with that Active Recreation Plan that they presented to the Parks and
Rec Committee. The Parks and Rec Committee did recommend approval of the proposed Active
Recreation Area Plan subject to the plan review comments that Staff had made. With this project,
there are a couple of Waivers that we need to talk about. One of them is related to sidewalks. The
project is required to have sidewalks or a pathway along its frontage. In the image shown, you
can see that a multi-use path will be provided basically from the east across the frontage. They
are seeking relief from constructing a sidewalk or pathway across the remaining two lots where
the existing single family detached housing units are. That is where they wish to not construct
sidewalk. They have had some discussions with DelDOT already about traffic-related
improvements and we will hear more from the applicant in that regard. They are seeking relief
from having to construct sidewalk along these two areas that are already developed: by the
single-family houses and its adjacent neighbor that is also a single-family unit with some other
accessory structures. The second Waiver Request is actually called a Subdivision Waiver
Request. In this request, the Subdivision Code requires two connections to a public street when a
site development consists of more than one hundred and fifty (150) dwelling units. With that,
they are only proposing this one entrance and have made that Request to serve this by that one
entrance. That one entrance, Staff does note, is a boulevard style entry; meaning that is has a
divided median. Planning Staff is supporting this Waiver Request because of the limitations on
6
9
Página 10
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
what actually has a frontage and some of the preliminary comments received from DelDOT
regarding the design of that entrance. Which really, there is not an option to get a second
entrance onto West Denneys Road in this area. Unfortunately, when Carlisle Village was
developed, there was no interconnection planned with that and then the remaining areas
surrounding this proposed development tract, in some cases are impacted by wetland areas or to
the north, there is actually a floodplain area where the City would prohibit construction in that
area anyway. This is the second Waiver for you to consider this evening. The DAC Report is
rather extensive. It includes the comments from the other regulatory agencies. This project did go
through the PLUS Review process and the initial PLUS comments as well as the applicant’s
response to those are part of the packet. The Minor Lot Line is just to reconfigure the three
existing parcels that we are dealing with to the configuration to place the large development on
the overall tract and adjust what was the rear areas of the existing single-family residences. Some
of that property land mass turns into the development area.
We do have the applicant representative here. She would just remind the Planning Commission
that this is a Site Development Plan. It is an allowed use for garden apartments in the RM-2
(Medium Density Residence Zone). With the SWPOZ (Source Water Protection Overlay Zone),
that has some limitations on impervious surface coverage which they’ve shown us the initial
calculations for that and they will be continuing to work with the Kent Conservation District
regarding stormwater management planning for the site. Tonight, the Planning Commission will
need to act on the partial elimination of sidewalk Waiver and then make a recommendation
regarding the Subdivision Waiver for the requirement of two connections to a public street.
Mr. Barnett stated that Mrs. Melson-Williams’ introduction was very thorough. As mentioned,
the project does have two Waivers that we will be looking for. Prior to submitting the plans to
the City of Dover, they met with the City Fire Marshal. They discussed the single entrance, the
circulation of emergency vehicles within the development, and the access to the buildings. They
actually sat down together to delineate and show where those were requested by the Fire
Marshal. The Fire Marshal made comment during the DAC Meeting that they had met those
requested locations and there was no problem on that behalf with the single entrance or the
design of the entrance. As stated, they did have a pre-application meeting with DelDOT in which
they reiterated to us that it is their intent and wishes to only have one entrance to this subdivision
off of West Denneys Road. West Denneys Road is a major collector in their hierarchy of streets
and their Subdivision Code states to only allow one entrance per subdivision onto roads of that
sort. Due to the remaining parcels around us, there aren’t any other connections to either State or
City owned roads to have another entrance to. They have also made comments in the DAC
Meeting packet that also states that they recommend the Waiver that was approved for a single
entrance access. Also, the other Waiver speaking towards the sidewalks, as stated, they have
sidewalks throughout the entire Site Plan provided for all of the residents. The only location that
we are requesting for it not to be is in front of the existing homestead for the Keller Family as
well as the Craig Family immediately west. They are proposing to have a multi-use path on the
east or the right of the entrance as shown on the plan. It will tie into the actual street frontage on
both sides; however, to extend that across the neighboring existing homesteads that sidewalk
would cut right through the middle of her driveway. It would be fifteen feet off the front of her
house and it would be quite cumbersome for Ms. Keller to continue to live there. We are
required per DelDOT at our entrance there in front of her house to have an acceleration lane as
7
10
Página 11
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
people come out of the subdivision to turn right and go west. There will be a bike lane that then
turns into the shoulder of West Denneys Road. So, there will be a way for people to walk along
that bike lane and pedestrian way to that side. But DelDOT will not want the sidewalk to be
within their right of way and due to the dedication of the additional right of way, it leaves a very
small area. We are going to still dedicate and show a fifteen-foot-wide easement in front of her
home and along the front of both of those properties there. If in the future, there is any sidewalk
to the west then this could potentially connect to. If for some reason in the future she moves
away and something else happens with that property, there would be an easement that would
allow for a sidewalk to be constructed. But at this time, there is no pedestrian facilities to the
west, no real logical reason to have this be built at this time. Therefore, we are requesting that
waiver.
Mr. Hartman stated that according to the PLUS statement, if there’s fifty (50) vehicle trips in per
hour in any hour of the day, there is TIS required. Is that correct? Responding to Mr. Hartman,
Mr. Barnett stated that he thinks that number is two hundred (200); that is the limit of when
DelDOT requires a TIS.
Mr. Hartman asked if he could review Comment 5 to your reply to the PLUS comment.
Responding to Mr. Hartman, Mr. Barnett stated that he thinks the comment is verbatim as we
received it. But in addition to that, we have another letter from DelDOT dated August 2, 2023
and the City was copied on it that says that “they will accept the areawide study fee for this as
they do not meet the necessity for a Traffic Impact Study.” He thought that it was going to have
that information in here, but he doesn’t see it in their language.
Mr. Hartman stated that the comments letter is dated September 29, 2023 and the requirement
here in your answer is fifty (50) vehicle trips per hour in any hour of the day. How many vehicle
trips do you project from this? Responding to Mr. Hartman, Mr. Barnett stated that number that
you are reading is not his response. That is the initial question that was written.
Mr. Hartman stated that they are saying that the requirement is per Section 2.2.2.1 of the Manual.
Responding to Mr. Hartman, Mr. Barnett stated that there are two parts to the question. The first
of which is that they report that during the maximum hour, the highest peak hour. They have
seventy-six (76) trips.
Mr. Hartman stated that they exceed what DelDOT has said first of all with about fifty (50)
vehicle trip ins per any hour of the day. Responding to Mr. Hartman, Mr. Barnett stated that they
are exceeding what was made in that comment here. He just found DelDOT’s other letter to us
where they do say that “this project would qualify for a payment to the Area Wide Study fee in
lieu of doing a TIS as it would generate fewer than 2,000 trips per day and fewer than 200 peak
hour trips.” He believes that the one from PLUS is a typographical error.
Mr. Hartman stated that it is also addressed in the same letter as Comment 6. So, which one is
this body supposed to take, Comment 5 or Comment 6? What is an area wide survey fee? What
do you anticipate paying for an area wide survey? Responding to Mr. Hartman, Mr. Barnett
stated that he believes that the language in Comment 6 is more accurate and is reflected of what
is in the Development Coordination Manual. He can’t speak to the typographical error in
8
11
Página 12
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
Comment 5. To the second question about the Area Wide Study fee, he believes that the letter
from DelDOT says that the Area Wide Study fee would be $19,980. In case you are not familiar,
that is not the fee that the developer would pay for improvements to DELDOT streets or to do
anything. It is just for DelDOT to double check their numbers and calculate everything.
Mr. Hartman stated that he understands that but could he explain what good is this Area Wide
Study fee going to do for this development and for the adjacent developments. Responding to
Mr. Hartman, Mr. Barnett stated that the Area Wide Study fee allows DelDOT to do their own
traffic calculations to determine if there are areas that have problematic intersections or if
additional improvements are needed in order to maintain safe traffic maneuvering.
Mr. Hartman stated that this Area Wide Study fee of $19,980 will not specifically address
concerns from Carlisle Village, Maple Glen, Farthing Woods, or this proposed development.
Responding to Mr. Hartman, Mr. Barnett stated that it very well could as the result of that.
Mr. Hartman asked if he could stop him on “could”. This body is supposed to make decisions to
protect the health, welfare and safety of the public and you are telling me that it “could.” We
have disagreeing comments here to the PLUS Committee. He doesn’t understand how this body
could make a decision tonight based on our responsibilities to the public to approve this.
Responding to Mr. Hartman, Mr. Barnett stated that West Denneys Road is a DelDOT State
maintained street. DelDOT does studies from time to time. Some are done by developers and
some are done internally. In those studies, they determine if the portions of street, intersections,
traffic are safe and if improvements are needed in order to keep those operating at their
standards. The Area Wide Study fee is the thing that a developer can pay to help DelDOT offset
the costs of doing those counts, but it in no way changes what requirements the developer is
required to do in order to update, improve and maintain those same areas. DelDOT still has the
opportunity to come to the developer and require them to make improvements to the road down
the street and intersections between the development and other high traffic areas. It does not
prohibit or preclude any of those things from happening.
Mr. Hartman asked who the local land use authority was here. Responding to Mr. Hartman, Mrs.
Melson-Williams stated that the reference to the local land use authority would be the City of
Dover and in its adopted regulations. That would be the Zoning Ordinance and the process that
we have for review which involves the Planning Commission. Collectively yes. She does want to
comment on the two different statements that DelDOT has made in the PLUS letter and in the
applicant’s response in Comments 5 and 6. They actually refer to two different sections of the
Development Coordination Manual. She thinks that there is one test for Traffic Impact Studies.
There is a different test which is the Comment 6 for if it would be eligible for an Area Wide
Study fee payment in lieu. So, there are two different threshold tests there. In the case of West
Denneys Road, DelDOT is the regulatory authority. They will have to meet the requirements of
DelDOT for the design of their entrance and connection to that roadway. It may involve other
off-site improvements to that segment of West Denneys Road or beyond. That will be part of any
kind of Entrance Plan review process with that regulatory agency.
Mr. Hartman stated that Article 7 of the special provisions, which you quote a variance and
waiver states that “City Council may vary or waive said requirements provided that such
9
12
Página 13
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
variance or waiver shall not be detrimental to the public health, safety or general welfare.” This
has happened before with traffic. He likes this proposal except for the traffic. It looks like a
beautiful development and he agrees with everything else except for the lack of a Traffic impact
study. Why did our Planning Office as the local land use authority not see this? You are looking
at DelDOT which looks at a chart and you are looking at it if as there is no other option than just
one entrance so we have to grant this variance. We, as the Commission, have to look at the
public health, safety and welfare and every time this issue comes up, we are left holding the bag.
We have to make a decision on public safety and welfare with no information except DelDOT
reading the chart and Planning Staff saying “well there is no other option.” It is quoted in this
PLUS comment that the DelDOT Manual requires a TIS with fifty (50) peak trips a day. They
are having seventy-six (76) so he plans to vote no on this application based on that. Responding
to Mr. Hartman, Mr. Barnett stated that he would again just reiterate that whether a Traffic
Impact Study is done by the developer or whether DelDOT uses the Area Wide Study fee to do
their own traffic analysis, it does not change what requirements will or will not impose on the
project in order to make sure that the surrounding roads and intersections are up kept to their
standards. He has seen two things from Mr. Hartman. One, he is concerned about there only
being one entrance. He would say that the traffic on West Denneys Road would be the same if
we had two entrances versus one. It is still the same number of units and traffic out on the road.
Two, DelDOT is going to determine what the developer is responsible to do because of their
traffic impact. That has absolutely nothing to do with whether or not they do a Traffic Impact
Study or whether DelDOT uses information gained through their Area Wide Study fee.
Mr. Hartman stated that he wishes it was in the Ordinance that it was DelDOT’s responsibility to
approve this thing and protect the public health and welfare. But it’s our responsibility and here
we are without any information from you or DelDOT and we have to make a decision to protect
the public health and safety. He thinks that they should come down on the side of public health
and safety rather than what could be or might be.
Mrs. Denney stated that she had questions along that line about the applicant’s statement that
there is no other entrance available. Even if for some reason there were able to come up with a
plan, it would still force the traffic on Denneys Road which is already an issue. She feels like it is
all over Delaware. All of our roads were built a long time ago and not to serve as many people
and so everything forces impacts. She sometimes looks at things and thinks okay another traffic
light, which only just makes everybody’s commutes longer especially in peak hours. Then she
thinks about school buses and things like that. It doesn’t appear as though there is really much
opportunity for widening there or to make another lane or even to have turn lanes. That gives her
great concern. She realizes that the ingress and egress and all of that traffic impact is all of the
responsibility of DelDOT and we can’t say that someone can only have so many cars. That is
DelDOT; it is a State maintained road and that is up to them. She really has a concern and she is
wondering if there was a way to have two areas for ingress and egress on West Denneys Road,
would that help? She is not an engineer so she wouldn’t proclaim yes or no but she is asking that
question. Responding to Mrs. Denney, Mr. Barnett stated that if you looked at Google Earth or a
wide view map of where this project is located, it’s just nowhere close where you can put another
road out to West Denneys Road. The closest thing that you have is to try to connect it
somewhere into Carlisle Village and as stated before, there is really not room to do that. He
would imagine that the residents of Carlisle Village wouldn’t want these people driving through
10
13
Página 14
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
their neighborhood and yet again, if they would, they would move 300 feet down the road and
exit onto West Denneys Road. If the concern is traffic along West Denneys Road, it would still
be the same number of cars whether they went through Carlisle Village or came out of their own
entrance.
Mrs. Denney stated these buildings are not designed as a senior community, so you are going to
have school buses. You may have even bus stops, people waiting along the road to take a bus in
town or to shop or to work, because we have more people doing that these days. She happens to
live on State Street and it’s an absolute walking community. At 8:00AM you have people out
there waiting for buses with their children, you have people who are biking and walking to jobs
that she assumes are in Downtown Dover because she never follows anybody. They generally go
by around 8:00AM and then again at 5:30-6:00PM in the opposite direction. So she is making a
broad assumption that they are going and coming from work. She is just concerned with the
width of the road, where the entrance is, or if there is like a DART bus stop. She knows that that
is up to DelDOT where they would make the area for the bus station, but she is just concerned. Is
there room for that? Responding to Mrs. Denney, Mr. Barnett stated that there will be dedicated
turn lanes out of the subdivision. We have been able to display that to DelDOT at our pre-
application meeting that there is the room to do that. It is his understanding that school buses and
other bus stops would be internal; so, they would come off of West Denneys Road and into the
neighborhood.
Mrs. Denney stated that the school bus thing makes sense that they will go in. Responding to
Mrs. Denney, Mr. Barnett stated that they have provided very wide drive aisles through the
entrance. As stated before, they have a boulevard entrance so there is a nice landscaped island in
the middle, but then it’s a twenty foot wide lane on either side. There is plenty of room for buses
and emergency vehicles to get in and out without having to worry about any of that. They should
be able to get into the internal part of the subdivision to be able to do any kind of bus stops or
pickups without backing up traffic on West Denneys Road.
Mrs. Denney stated that when she looks at these plans, the other thing is that there is already
going to be an impact on Carlisle Village. But there would be no reason that they could
accomplish anything by going through Carlisle Village in any way. We also need to think about
the people who are established in Carlisle Village. We don’t want their homes, their daily
commutes, or their lives to be anymore disrupted than getting a new neighbor would be.
Responding to Mrs. Denney, Mr. Barnett stated that unfortunately when that subdivision was
designed there was no provisions made for a future connection. It is single lots all along that side
and there is really not a gap anywhere to be able to connect the road through.
Mrs. Denney stated that at this point, they all have to come out through the new development to
get out on Denneys Road. Responding to Mrs. Denney, Mr. Barnett stated that there will be no
cross traffic straight between Carlisle Village and Windward Ridge either way.
Mr. Hartman asked about Lot B, if that lot was part of the development and would that help in
the exit in any way? That is one of the owners, correct? Responding to Mr. Hartman, Mr. Barnett
stated correct, one of the existing landowners in going to retain that parcel to continue to live in.
11
14
Página 15
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
Mr. Hartman asked that if they were to give up that parcel, would engineering permit a better
outlet to Denneys Road. Responding to Mr. Hartman, Mr. Barnett stated that he would say two
things to that. One, DelDOT’s Development Coordination Manual very clearly states that for
major collector roads, any subdivisions shall have access through one single access point, and
they would not allow a second one. They stated to us in the meeting as well that they wouldn’t
and again, it will not change the amount of traffic on West Denneys Road one bit. It would still
be the exact same number of cars. You would then have a traffic congestion area with two
entrances so close to each other.
Mr. Hartman stated that he understands that and agrees with it but he was just thinking about
road widening.
Dr. Jones stated that she concurs with the concern about the traffic. There are three other
developments in that area that use West Denneys Road. Responding to Dr. Jones, Mr. Barnett
stated yes, he thinks that there might be three.
Dr. Jones stated that they all access that road that doesn’t even have much of a shoulder. So the
number of cars or trips to which you refer, basically you are referring to those that would be
generated by the apartments. Responding to Dr. Jones, Mr. Barnett stated that is correct.
Dr. Jones stated that does not really take into consideration every trip. She has a lot of testimony
from people in that area and that is one of their major concerns. One even mentioned that of
course housing is desirable, but the traffic will be a nightmare. So that will be one of her
concerns as well because it really is a bad road. Responding to Dr. Jones, Mr. Barnett stated that
the best response to that would be that the developer will be providing money to DelDOT for
improvements as part of their entrance design and requirements. DelDOT often collects these
monies from different subdivisions and then puts them towards their capital projects. If they
determine that West Denneys Road needs to be improved between the entrance here and the light
at McKee Road or anything like that, they can do one of two things. They can require the
developer to actually pay for that upfront or pay into a kitty that as it builds up with enough
money that they can then make those kinds of improvements on a statewide basis. Obviously, for
the developer to do that might impact other landowners up and down West Denneys Road and
that is difficult to do from a private side. But if the developer pays money to DelDOT, then they
can do it as a capital project.
Dr. Jones stated that she can appreciate that but of course what happens normally, the
improvements are not concurrent with the completion of new developments.
Mrs. Maucher opened a public hearing.
Mr. Brandon Politt – 3232 Kenton Road Dover, DE 19904
Mr. Politt stated that he is the landowner of 3232 Kenton Road which is connected to the
northern side. He travels West Denneys Road quite frequently and it is very heavily traveled. He
does ask Council to keep in mind that you do have two more proposed developments coming up.
Stonebrook East and Stonebrook West are going to add additional traffic to West Denneys Road.
He has already seen accidents at Carlisle Village and the house on the corner has already been
12
15
Página 16
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
run through. His other concern is what is going to be done to keep people out of other people’s
properties. Are there going to be fences, privacy barriers or anything along those lines?
Mr. Kenny Clendaniel – 3867 West Denneys Road Dover, DE 19904
Mr. Clendaniel stated that his property is approximately four (4) properties west of this entrance
that goes into this new development. If Mrs. Melson-Williams’ statement was correct that there
are 2.25 cars that they need parking spaces for, that’s about 672 cars that could be coming out of
there and this entrance is in the middle of a S-curve. There is a curve to the east and a curve to
the west. There is very little chance to see either way whether there are cars coming or not. He
has lived on West Denneys Road for 73 years and he has seen it grow up to the point now where
there are no shoulders at all from Dover Kenton Road all the way to McKee Road. There is not
one bit of shoulders on that road. He belongs to the fire department that covers that road and we
have run many accidents between Carlisle Village and that S curve there. He thinks that is
something that we need to keep in mind.
Mr. C.J. Palmer – 48 Ardsley Drive Dover, DE 19904
Mr. Palmer stated that he lives in Carlisle Village. Looking at this project, it is a pretty large
project and it is actually bumping right up against Carlisle Village. We have the environmental
piece and a security and safety piece. Will this property be separated from Carlisle Village?
Talking about that entrance from a security and safety piece, regardless of how many spaces you
have, these buildings look like three to four stories high. For emergency vehicles to get in there,
especially ladder trucks that are going to cause an issue especially for turnarounds and things of
that nature. For the security up against the Carlisle Village community, is there going to be a
separation fence line? How do we plan on doing that because whoever is occupying these
buildings, they may find it necessary to cross through people’s yards or something to find a way
out or an easy way through. You were talking about sidewalks and things along that area. How is
that going to really affect Carlisle Village? From a resident’s point of view, what type of
residents because we have assisted living? Will there be assisted living or low income apartments
in there? These are things that he would like to know. Where can he go to see the studies that
have been done on this? Just by living there, like the gentlemen before him, there have been
many accidents. He has seen the Carlisle Village entrance get hit three or four times. But the
other piece is the environmental piece. When it rains heavily, are they redirecting all that water
or are they going to be redirecting it into Carlisle Village? Right now, it flows right across
Denneys Road especially at that bend right there. There are a lot of nuisances that we need to
address or if they have been addressed, how can we get that information and read up on it to see
if it’s been addressed appropriately?
Mrs. Melson-Williams stated to answer a couple of questions, there is an open area between the
planned improvements for the apartment project and where Carlisle Village is. She believes that
there is a woods line there and she doesn’t believe that it is intended to be fenced. But there is
definitely a separation there. What would be the closest to Carlisle Village is a series of parking
spaces and a couple of the garage buildings for a portion of the site. For the other question about
the types of residents, she believes that this is what they would call a “market rate” apartment
complex. It is not specifically targeted to any particular income group or need group that has
been mentioned. Our Code does not require them to identify that as part of their process. And the
environmental question about rain, they will have to manage the stormwater i.e. the rain that falls
13
16
Página 17
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
on their property on their site. They will be working with the Kent Conservation District as to
plans for where they need to add ponds or other facilities to manage their water on their site. Mr.
Palmer, if you would like to view their plans more closely, you can certainly reach out to the
Planning Office. We are located here in Downtown Dover in the City Hall building. We are open
8:30AM-5:00PM and we would be happy to show you the plans and help you understand those.
If you reach out to us, they could also provide some things to you electronically. They are posted
on the City’s website as part of tonight’s meeting packet as well.
Mr. Barnett stated that the only thing that he was going to add was that along the common
property line of Carlisle Village, they are proposing to retain at minimum, a twenty (20) foot
wide strip of trees in that setback. In most places, it is a little bit wider than that. The narrowest
part is down at the southern end at the closest parking spaces to West Denneys Road. As you
travel back into the neighborhood just because of the way the two property lines aren’t parallel to
each other, it actually gets wider towards the back end. It is closer to about forty (40) foot wide
of trees that will be saved. In addition, up against those remaining trees there is all parking
spaces, none of the buildings are right there. The closest buildings are going to be over 95 feet
away from the property lines. The parking spaces up against there will have islands in them and
those islands will have additional landscape trees planted. As Mrs. Melson-Williams stated, they
will be working with the Kent Conservation District for stormwater management. They have
already had discussions with them and technical exploration have been done to determine if we
can do infiltration which they were hoping to do on this site in some places. The stormwater
management will be designed so that no additional runoff will leave the property onto any of the
surrounding sites.
Mr. Joseph Blevins – 39 Ardsley Drive Dover, DE 19904
Mr. Blevins stated that he agrees with what Mr. Palmer was saying. He understands that it was
said that these are market rate apartment housing which is fine but there are 300 units. Are we
assuming that everybody living in this apartment complex is going to be automobile dependent
because if not, all of West Denneys Road doesn’t have sidewalks and the nearest place to get
groceries is 2.3 miles away at Redners. He kind of heard all of that conversation but the audio
has been very in and out. Additionally, there are no bus stops along that way and that’s not really
the developer’s problem. It would be a City of Dover decision to put bus stops in, correct? To put
an apartment complex that is isolated like that and expect everyone to have an automobile, just
seems a little far-fetched to him. He knows that they are talking about one entrance in. Yes,
Carlisle Village has one entrance, but Carlisle Village was built in 1996. It had different rules
and regulations. They have changed since then and for good reason. In regards to the buffer,
twenty foot of growth is not actually a big buffer. Are you ripping out all of the old growth and
putting in new? He would like to actually see a fence in addition to the wooded buffer. Finally,
his question is when the developers do come in and start clearing out all of these old growth trees
for their development that have been there for quite some time, there is quite a bit of wildlife that
lives there that is now going to want to live in his front yard. Does he get to charge the developer
for damages to his property for the wildlife that they have disrupted? Responding to Mr. Blevins,
Mrs. Melson-Williams stated that on the question about the bus stop location, that is not a City
decision. Public transportation is part of the DART First State Program. They look at
development activities and would identify if a bus stop location is necessary and where that
should be placed in that corridor area.
14
17
Página 18
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
Mr. Blevins stated that Denneys Road is just a really dangerous road to be walking on.
Mrs. Melson-Williams stated that for the concern with the buffer, she believes that their intention
is to leave the existing trees in that area. There will be some additional, in close proximity, tree
plantings of new trees to meet the tree planting requirements for the overall site as well.
Mr. Jordan Ford – 4193 West Denneys Road Dover, DE 19904
Mr. Ford stated he does like lot of what was mentioned in regards to the proposal of the project.
He has two main concerns with it. One is that his property is right on the edge of Carlisle Drive
on West Denneys Road. He is right on that S curve. If we are going to be putting in that entrance,
he sees that as a huge issue because time and time again, people are already speeding through
this road. We are already having people pull out of Carlisle Village without that stop sign. He is
not sure if this is for DelDOT, but he would propose at minimum, a traffic light to be
implemented here or at least onto that new apartment complex. Another thing that he would
mention is the wildlife impact that it would have. Right now he has that woods as his backyard
and it is really a shame to have that taken away. As the other caller mentioned, to have that
displaced is definitely going to put damage onto his property. He would like to know how that
would be used.
Mrs. Melson-Williams asked if there was a particular question that Mr. Ford was looking for an
answer on because it wasn’t real clear. Responding to Mrs. Melson-Williams, Mr. Ford stated
that he just wanted to make those statements.
Mrs. Melson-Williams stated that there were two items of public comment that were received in
writing. The first one was received in time and it went out in our packets to the Planning
Commission members. That was an email dated September 29, 2023 from Mr. Joseph Blevins. In
his email, he notes the need for housing but then also listed some questions which she thinks that
he reiterated in his statement this evening about questions on its proximity to really anything
service-wise, the concern about Denneys Road with bust stops, the road itself, and the lack of
sidewalks. So that is presented for the Planning Commission. This evening, it was on the
Commissioner’s desks and was distributed by email as well, is an email that was received on
October 12, 2023 from Ms. Beth Knight. She notes that she is a longtime resident and
homeowner in Carlisle Village. She notes some concerns about the apartment buildings. Mainly,
her statement is focused on West Denneys Road itself, noting the makeup of that road with no
shoulders, turn lanes or sidewalks in this area and the levels of traffic over time and the potential
for concerns with if there are accidents in the area and the ability to exit various neighborhoods.
Her closing statement is that she has other concerns but the traffic situation is probably the
priority. She disagrees with a large apartment complex being built at that location.
Mrs. Maucher closed the public hearing.
Mr. Hartman stated that six or seven of the public commenting tonight either here or virtually or
by email, mentioned their concerns with traffic and three or four of them mentioned their
experiences with accidents in that area. He just wanted to again state that their responsibility to
protect the public’s safety, health and welfare and that is the same with City Council. He is
disappointed that they weren’t given a Traffic Impact Study.
15
18
Página 19
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
Mr. Baldwin stated that he has listened to the testimony and read the technical data. This
afternoon, he spent 2 hours on that curve. He would drive to McKee Road to Kenton Road and
he would wait at the curve just to observe the traffic that was coming at that curve. In the two
hours that he was there, he was almost hit twice. So, he is imagining what would happen if
something happened in front of the entrance to this apartment complex. The people would be
trapped in there and would not be able to get out. He is just uncomfortable going with one
entrance. He is thinking that maybe there is something else that can be done to make that curve
safer for the people who are going in and out. Secondly, is there going to be a left and right in
and out or is it just going to be a left in and a right out? Responding to Mr. Baldwin, Mr. Barnett
stated that it will be a full movement left and right in and out.
Mr. Baldwin asked if they were going to have acceleration and deacceleration lanes. Responding
to Mr. Baldwin, Mr. Barnett stated yes. There will be acceleration and deacceleration lanes and
there will be safety area for someone to turn left into the subdivision and to be able to get around
the vehicle that is stopped there. DelDOT will require us to widen the road through the S turn. If
there is an ability to soften the sharpness of the curves, they will have that done as well. It will all
be part of the final engineering and design. At this time, we are not at that process but that’s
something that DelDOT’s safety engineers will review and require as part of the entrance. In
addition to widening that, he believes that the site lines will be opened up so that you can see
better through that S-turn DelDOT will require them to take out some of the trees right along the
edge of that road that kind of blocks that now. That should hopefully make it have a better
viewpoint in both directions.
Mr. Hartman moved to table application S-23-19 Windward Ridge Apartments on West Denneys
Road for construction of 13 garden style apartment buildings until this body is provided a Traffic
Impact Study or other proof that 300 apartments in this development will not be adding to the
safety hazard that apparently already exists on West Denneys Road. He bases that partly on the
PLUS Report, the DelDOT comments specifically their comments in Section 2.2.2.1 of the
Development Coordination Manual which requires a Traffic Impact Study where development
generates in trips of 50 or more vehicles in any hour of the day. As the applicant stated, they
have 76 in trips at peak. The motion was seconded by Dr. Jones. (Discussion continued.)
Mrs. Maucher asked if there was a proposal of how to bring it back. Are you looking for a letter
from DelDOT? Responding to Mrs. Maucher, Mr. Hartman stated that he is looking for
something from either the City, the developer or DelDOT that would alay the fears of the public
and of himself and others in this body that they would not be creating a safety hazard with
approval of this application based on the 300 apartment units. He is looking for something to
base a recommendation that yes, it provides safety, health and welfare for the public and he is
not there yet. He doesn’t see anywhere in here that says that.
Mrs. Maucher asked Planning Staff if there was a requirement on timing to bring it back.
Responding to Mrs. Maucher, Mrs. Melson-Williams stated that in the current motion that was
put forth by Mr. Hartman, it was a motion to table. She would suggest that it is changed to a
motion to defer. He requested specific information so it would be upon receipt of that
information, they could then place it back on your meeting agenda to complete the consideration
16
19
Página 20
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
of that should this motion that was put forth be successful this evening.
Mr. Hartman moved to defer application S-23-19 Windward Ridge Apartments on West Denneys
Road for construction of 13 garden style apartment buildings until this body is provided a Traffic
Impact Study or other proof that 300 apartments in this development will not be adding to the
safety hazard that apparently already exists on West Denneys Road. He bases that partly on the
PLUS Report, the DelDOT comments specifically their comments in Section 2.2.2.1 of the
Development Coordination Manual which requires a Traffic Impact Study where development
generates in trips of 50 or more vehicles in any hour of the day. As the applicant stated, they
have 76 in trips at peak. The motion was seconded by Dr. Jones and the motion was carried 7-0
with Mr. Cooper absent. Mr. Hartman voting yes; based on his earlier statements. Mr. Baldwin
voting yes; based on prior statements. Dr. Jones voting yes; for reasons that have been stated
and the concerns of the residents in that area as well as other information that has been
discussed. Mrs. Welsh voting yes; she would like more information herself. In looking at the
plan, the current location of the entrance does appear to be one of the most unsafe locations
from her point of view that it could be located. Mr. Roach voting yes; in regards to the concerns
of the residents of the area and the entrance way and also the traffic. He does believe that they
need a little bit more information just so they can make a better informed decision. Mrs. Denney
voting yes; she thinks that she would like to be better informed most especially about DelDOT’s
information because obviously already by testimony given by people this evening, there are lots
of accidents along that road. And whether they recommend a traffic light or whatever DelDOT
recommends, she thinks that it would be important information for us to hear. It’s more than just
the traffic. She always thinks what if there is an accident and what if we have fire and rescue
equipment trying to get into one of the apartments but the roads are all blocked because there
really isn’t much shoulder. She just really would like to hear back, for safety’s sake, what
DelDOT has to say. She also just wants to state that she has concerns for the residents who have
expressed safety concerns and would like more than just a distance buffer between them and the
neighboring development of Carlisle Village. Mrs. Maucher voting yes; particularly on
information regarding the safety concerns around the curve and the improvements that will be
made to ensure safety with that.
MI-23-03 Text Amendment: Add Use to C-2 (Central Commercial Zone) - Public Hearing and
Review for Recommendation to City Council of a Text Amendment to the Zoning
Ordinance, Article 3 – District Regulations, Section 13. Central commercial zone (C-2), Section
13.1. The Ordinance proposes adding the use of indoor recreation and amusement establishments
as a permitted use in the C-2 zone. Ordinance #2023-08. First Reading was held by City Council
on September 11, 2023 where the Public Hearing dates were set for Planning Commission on
October 16, 2023 and City Council on October 23, 2023.
Representative: Planning Staff
Mrs. Melson-Williams stated that this Text Amendment is on a different track than the ones that
she spoke about earlier. This is a request for Ordinance #2023-08. There was a request to add the
use of “indoor recreation and amusement establishments” as a permitted use in the C-2 (Central
Commercial Zone). The C-2 (Central Commercial Zone) is found predominantly basically in the
downtown area and focused on the Loockerman Street Corridor. We currently have several of
our zones that do allow for indoor recreation and amusement establishments. Those particularly
17
20
Página 21
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
are in the IO (Institutional and Office Zone), the C-3 (Service Commercial Zone), the C-4
(Highway Commercial Zone), and it was most recently added to the IPM-2 (Industrial Park
Manufacturing Zone – Business and Technology Center). From the Report, we did provide you
with the current permitted conditional uses that exist in the C-2 (Central Commercial Zone). This
would add an additional line to include the indoor recreation and amusements to that. With this
process, the Zoning Ordinance gives certain factors that the City Planner should report on when
looking at any Text Amendment requests. It calls on us to look at the principles of the ordinance
and the particular zone that it is looking to make changes to and also to look at the aims of the
Comprehensive Plan. In our Report, we noted that the Comprehensive Plan does have discussion
items in the Housing Chapter. With a goal to provide safe, healthy and livable neighborhoods
and to articulate the link between housing and health. We see that any type of recreational
facility in the Downtown District would certainly encourage healthy lifestyles for residents of the
area or people that happen to be visiting. Likewise, Chapter 12 of the Comprehensive Plan which
is the Land Development Plan focuses this area. C-2 (Central Commercial Zone) is one of the
mixed-use areas in the city that we find in Downtown Dover. That is a mix of uses as residential,
commercial and office uses; so, we find that this fits that opportunity for a mix of uses. In this
case, because it is a Text Amendment to the Zoning Ordinance, the Planning Commission will
be making a recommendation. That recommendation, after a public hearing tonight, will be
forwarded onto City Council. City Council will conduct their own public hearing and action on
the Text Amendment. The Planning Commission is charged with evaluating the same factors as
the City Planner and those are: is the change of the Text Amendment consistent with the aims
and principles embodied in the Ordinance as to the particular zone concerned? In this case, that
zone is the C-2 (Central Commercial Zone). And then whether the proposed amendment is
consistent with the Comprehensive Plan. This was a thought that was brought to us and then
became an Ordinance request with the support of City Council members to beginning the review
process.
Mrs. Maucher asked if there was a formal definition for “indoor recreation and amusement”.
That could invite a large number of interesting applications. Responding to Mrs. Maucher, Mrs.
Melson-Williams stated that the Code does not currently have a definition nor does this Text
Amendment propose one. Indoor recreation could be a range of things such as a karate studio, a
gym, or some place where you actually would play games such as a bowling alley, a roller rink
or things of that nature. There are some general common sense things that we would interpret to
be allowed in that zone that meets the recreation and amusement establishment use. She thinks
that it would be where a person comes there to do something in particular that involves
movement of some type.
Mrs. Denney stated that examples that you gave were roller skating and bowling. Would a pool
hall qualify? Responding to Mrs. Denney, Mrs. Melson-Williams stated yes, technically.
Mrs. Denney asked if an arcade with pinball type games would qualify. Responding to Mrs.
Denney, Mrs. Melson-William stated yes. This establishes a use in the Zoning Ordinance. In
order to establish any such activity in a particular building location, there are additional
requirements with the Building Code and Fire Code. Depending on what exactly that activity is,
then it will be necessary to prepare the space with its correct means of egress/entry and whether
it requires sprinkler, fire alarm, and the like.
18
21
Página 22
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
Mrs. Welsh stated that the wording “indoor recreation and amusement establishments” is the
wording that’s in the IO (Institutional and Office Zone), C-3 (Service Commercial Zone), C-4
(Highway Commercial Zone), and IPM-2 (Industrial Park Manufacturing Zone – Business and
Technology Center). Are there no specifics in any of those zones as far as what the recreation
would be as well? Responding to Mrs. Welsh, Mrs. Melson-Williams stated that was correct. We
chose to utilize the same language that is found elsewhere in the Zoning Ordinance already.
Mrs. Welsh asked if there was really not anything specific as to the definition of “recreation and
amusement” in any of the zones right now? Responding to Mrs. Welsh, Mrs. Melson-Williams
stated that is correct. When the Zoning Ordinance does not specifically define a word, then the
practice is to go to a commonly used dictionary and to see if that lends assistance in clarifying
that activity specifically.
Mrs. Welsh stated that she just wanted to confirm that wherever it is, it’s all based on the
proposal and common sense as far as what would be appropriate. Responding to Mrs. Welsh,
Mrs. Melson-Williams stated that is correct. If there is a question on whether an activity fits
those terms of “indoor recreation and amusement establishment”, the Zoning Ordinance gives
the City Planner the ability to interpret and that’s what would be done if there was someone
seeking to make use of the space in that manner.
Mrs. Welsh stated that basically this adds it to another zone, but rules are the same for
everybody. Responding to Mrs. Welsh, Mrs. Melson-Williams stated that is correct. It uses the
same terminology as we already we have in the other zones.
Mr. Hartman asked if that would include a rollercoaster on an empty lot. Responding to Mr.
Hartman, Mrs. Melson-Williams stated that technically not because it uses the term “indoor”
recreation and amusements. There is, she believes, in the C-2 (Central Commercial Zone) an
additional statement that talks about uses happening within enclosed buildings. If you are
thinking the amusement rollercoaster ride that’s an amusement park that’s open air, she does not
believe that would be in the definition here.
Mrs. Maucher opened a public hearing and after seeing no one wishing to speak, closed the
public hearing.
Mrs. Welsh moved to recommend approval to City Council for MI-23-03 Text Amendment: Add
Use to C-2 (Central Commercial Zone) to accept the text amendment as written, seconded by
Mr. Baldwin and the motion was carried 7-0 by roll call vote with Mr. Cooper absent. Mrs.
Welsh voting yes; it seems to be a sensible thing to do in order to generate some more Downtown
Dover development. Mr. Roach voting yes, he always commends the Staff for being detail
oriented in nature when it comes down to these things. He definitely feels as though it’s welcome
and it is definitely necessary to try to bring some uniformity in regards to the actual Codes. Mrs.
Denney voting yes; she thinks that it would be very helpful for Downtown to broaden the
horizons with some ideas of some other things that people can do. Although, she has to say that
these types of things make her nervous. Mr. Hartman voting yes; based on the fact that it is
consistent with the aims and principles embodied in the Ordinance and consistent with the
Comprehensive Plan, and he also thinks that it is a good idea. Mr. Baldwin voting yes; based on
the prior statements. Dr. Jones voting yes; based on previous statements. Mrs. Maucher voting
19
22
Página 23
CITY OF DOVER PLANNING COMMISSION OCTOBER 16, 2023
Item 1.
yes; based on previous comments. She would also encourage City Council to consider adding
some definitions to what that constitutes because she would have the concern that if someone
proposes something that is undesirable, that there may not be an opportunity to reject it when
you have broad language. Adding a little more definition might be helpful.
NEW BUSINESS
Update on Review of and Revisions to By-Laws and Development of Planning Commission
Rules of Procedure
Mrs. Maucher stated that they circulated an initial draft of the By-Law changes. There are some
more definitions that need to be added to those. They are working on the Rules of Procedure;
however, with the change in Planning Staff’s attention, she is afraid that this may be deferred for
a bit. She is sure that they have quite enough to do without this and that it is not an urgent issue.
They will try to bring something back before the end of the year at maybe the December meeting
to see where we are.
Mrs. Denney stated that she thinks what has been put on paper so far looks really great, but she
agrees. She thinks with all of the changes that have occurred recently within the Department, she
thinks people have plates that are very full right now and there really doesn’t seem to be an
urgency. We don’t want to just hurry to get it done and then miss out on something. But she does
think it’s coming along very well, although she hasn’t really had any participation in it. She
thinks it’s wonderful, but she agrees that they should just hold off a little bit.
Meeting adjourned at 9:21 PM.
Sincerely,
Kristen Mullaney
Secretary
20
23
Página 24
Item 2.
The Institute for Public Administration presents
Advanced Land Use Law
COURSE INSTRUCTOR
Max Walton, Esq.
Connolly Gallagher LLP.
December 20, 2023 This course focuses on advanced land use law
in Delaware and expands upon the material
presented in our introduction to land use law course.
10:00 a.m. to NOON This course will highlight the recent land use
case law from the past year that may affect
municipalities statewide. Participants will learn
VIA ZOOM MEETING about both national court decisions and Delaware
court decisions affecting local land use.
Registration in advance is required.
After registering, you will receive a This session qualifies for credit toward the
confirmation email with information
about joining the webinar. Certificate in Local Government Leadership and the
Certificate for Planning Education.
$20 Registration Fee Contact Sean O’Neill (oneill@udel.edu) with
questions about this event.
AICP members can earn 3 Certification
Maintenance (CM) credits and 1.5 Law
REGISTER ONLINE credits for this activity. More information
about AICP’s CM program can be found
www.bidenschool.udel.edu/ at www.planning.org/cm.
ipa/events/upcoming
24
Página 25
The Institute for Public Administration presents Item 2.
Planning 101: Planning Your
Community’s Future
COURSE INSTRUCTOR COURSE INSTRUCTOR
David Edgell, AICP Edward O’Donnell, AICP
Director Senior Fellow, IPA
Office of State Planning Coordination University of Delaware
COURSE INSTRUCTOR
Max Walton, Esq.
Partner
Connolly Gallagher, LLP
JANUARY 17, 2024 Planning 101 provides valuable information for
all elected officials who consider and act upon
comprehensive plans, land use and zoning matters,
9:00 a.m. to NOON .
Check-in begins at 8:30 a.m.
and other growth issues. Planning and zoning
commissioners, board of adjustment members, and
those who take part in community planning and
land-development matters will enjoy this course.
Kent County Levy Court
Room 220 Course topics will include:
555 S Bay Rd, Dover, DE 19901 • Delaware planning and zoning statutory
requirements
$55 Registration Fee • The elements of a comprehensive plan
Includes refreshments
• The basics of land use control
• The role of the planning & zoning commissioner
REGISTER ONLINE This session qualifies for credit toward the Certificate
www.bidenschool.udel.edu/ in Local Government Leadership and the Certificate
ipa/events/upcoming for Planning Education.
Contact Sean O’Neill (oneill@udel.edu) with questions
about this event.
25
Página 26
Item 3.
Potential Revisions to Zoning Ordinance for C-2 (Central Commercial Zone)
CURRENT CODE RECOMMENDED CONCEPTS FOR REVISION
Zoning Ordinance, Article 3 Section 14 or as noted
1 Retail stores No change
2 Restaurants No change
3 Hotels, including bed and breakfast inns No change
4 Art galleries and studios No change
5 Service establishments No change
6 Personal service establishments No change
7 Business professional, and government offices No change
8 Apartments and multi-family dwellings, provided that no Allow uses associated with apartments (i.e., lobbies,
dwelling units shall be permitted in the first floor on the amenity spaces) on first floor of Loockerman Street
street frontage of Loockerman
9 Parking lot and parking structure is a Conditional Use (A Parking lot and parking structure as a permitted use
Conditional Use is required to be reviewed and approved
USES
by the Planning Commission.)
10 Not clearly allowed Microbrewery/craft distillery/meadery
11 Allowed by interpretation Commercial Kitchen
12 Manufacturing, assembling, converting, altering, Allow the making and processing of consumer goods and
finishing, cleaning, or any other processing of products products such as baked goods, glass blowing, and
where goods so produced or processed are to be sold at handmade items where goods are processed and sold at
retail exclusively on the premises, provided that: retail or on-line.
(1) An area fully concealed from any street and equal to not more
than 20 percent of the area devoted to retail sales shall be so used;
(2) Electrical power not to exceed a total of five rated horsepower,
and steam pressure not in excess of 60 pounds of pressure per
square inch shall be used exclusively;
Potential Revisions to C-2 Zone Chart 10.18.2023 Page 1 of263
Página 27
Item 3.
(3) Not more than four employees are engaged in such production
or processing
13 Pop-up kitchen/restaurant/retail are not clearly allowed Pop-up kitchen/pop-up restaurant/pop-up retail
14 Place of public assembly is a Conditional Use Place of public assembly as a permitted use
15 Outdoor use – i.e., patios, eating areas, parklets Clarify process of outdoor use – i.e., patios, eating areas,
parklets
16 Maximum building height is 6 stories and 75 feet Maximum building height 10 stories and 125 feet
BUILDING HEIGHT
Zoning Ordinance, Article 4, Section 4.14 • If building is above 3 stories, then upper floors need
to be setback (wedding cake style) on sides facing
the street.
• Consider Residential 10% set aside of units for
affordable units for every floor above 6 stories and
75 feet. Can be put into an affordable housing fund
for non-profits.
17 No parking requirements for existing buildings in C-2 No parking requirements for existing buildings in C-2
Zoning Ordinance, Article 6 Section 3.1(a)ii zone
No minimum parking requirements for new construction
in C-2 zone
18 Parking minimums for the following uses (for all zoning No minimum parking requirements based on use in the
districts): Downtown Redevelopment Target Area
• Medical Office: 1 space per 300 square feet of floor
PARKING
area
• Apartments: 2 spaces per dwelling unit plus 1 space
per 200 square feet office space plus 0.25 space per
dwelling unit for visitor space
• Restaurants and bars: 1 space for every 4 seats plus 1
space for every 3 bar seats
• Hotel: 1 space per guestroom plus 1 space for every
200 square feet of office space, banquet hall, or
meeting areas
Potential Revisions to C-2 Zone Chart 10.18.2023 Page 2 of273
Página 28
Item 3.
Zoning Ordinance Article 6 Section 3.1
19 The Planning Commission (or City Planner if it’s an Parking Waiver still available for consideration
administrative plan review) may consider a waiver to
reduce the required parking amount by up to 50% if
applicant demonstrates the project is adequately served by
transportation and parking alternatives. Zoning
Ordinance, Article 6 Section 3.9
20 Bicycle parking-1 bicycle parking space for every 20 Bicycle parking will still be required
parking spaces. The Planning Commission may waive this
requirement. Zoning Ordinance, Article 6 Section 3.10
21 Floor Area Ratio (FAR) 4.0 Consider removing any lot coverage restrictions
22 Tree mitigation fund not available Allow for tree mitigation fund whereby a donation to the
fund in lieu of planting a tree per the landscaping
requirements in Downtown
23 Dumpster rate based on use. Eliminate Dumpster rate but keep screening and enclosure
MISCELLANEOUS
• Restaurant: Two required for the first 3,000 square requirements
feet of gross building area; one required for each
additional 3,000 square feet of gross building area
or fraction thereof
• Office and retail less than 50,000 square feet: Two
required for the first 16,000 square feet of gross
floor area; one required for each additional 16,000
square feet of gross floor area or fraction thereof
• Apartment: Two required for the first 48
apartments; one required for each additional 24
apartments or fraction thereof
Potential Revisions to C-2 Zone Chart 10.18.2023 Page 3 of283
Página 29
Item 4.
S-23-19 Windward Ridge Apartments on West Denneys Road:
This application was originally submitted to the Planning Commission for review
at their October 16, 2023 meeting. A Public Hearing was conducted, and the
application was deferred seeking additional information.
S-23-19 Windward Ridge Apartments on West Denneys Road – Review of a Site
Development Application for the construction of thirteen (13) garden style apartment
buildings consisting of eleven (11) buildings containing twenty-four (24) units and two
(2) buildings containing eighteen (18) units for a total of 300 apartment units. Also
proposed are twelve (12) garage buildings, a Club House with Pool, walking paths,
parking, and other site improvements. Two (2) existing single family detached dwellings
will remain on separate lots after a Minor Lot Line Adjustment Plan to reconfigure the
three properties. The properties are zoned RM-2 (Medium Density Residence Zone) and
partially subject to the SWPOZ (Source Water Protection Overlay Zone). The subject site
consists of three parcels totaling 40.12 acres +/- located on the north side of West
Denneys Road and west of but not adjacent to Carlisle Drive. The owners of record are
George L. Craig Jr. and Deborah J. Craig; Robert G. Keller and Gloria K. Keller; and
Bruce A. Burkett and the equitable owner is Jack Lingo Asset Management, LLC.
Property Addresses: 57 Rocky Road, 4085 West Denneys Road, and an unaddressed
parcel on West Denneys Road. Tax Parcels: ED-05-056.00-01-02.00-000, ED-05-056.00-
01-03.00-000, and ED-056.00-01-04.00-000. Council District 1. Review of Active
Recreation Area. Waiver Requests: Partial Elimination of Sidewalk and Subdivision
Waiver of Requirement for Two Connections to Public Street. This subject area was
annexed with Application AX-22-03 Lands of Craig, Keller, and Burkett: Annexation of
Three Parcels on West Denneys Road. At the October 16, 2023 Meeting, the Planning
Commission conducted a Public Hearing and then deferred action on Application S-23-
10 seeking additional information.
Original Attachments as submitted for October 16, 2023 Planning Commission Meeting:
a. Development Advisory Committee (D.A.C.) Report (including Agency
Comments) of October 4, 2023
b. Active Recreation Area Plan Report of October 10, 2023 (PRCE)
c. Waiver Request Letters: Second Entrance and Sidewalks
d. PLUS Review Response Letter of September 29, 2023 and PLUS Comment
Letter of August 23, 2023
e. Site Plan Set
f. Architectural Set
g. Public Comments Received (as of 10/6/2023) Set 1 and Additional Email of
October 12, 2023 (distributed at Meeting)
Additional Information for the November 20, 2023 Planning Commission
Meeting on Application S-23-19 will be forwarded when received from the
Applicant. It is expected the week of November 13th.
29
Página 30
Item 4.
Additional Information for
S-23-19 Windward Ridge Apartments on West Denneys Road:
The following information has been received for Application S-23-19:
• Letter of November 14, 2023 on Windward Ridge – Traffic Coordination
Summary from Morris & Ritchie Associates, Inc. with Attachments
o Attachment A: Traffic Impact Study Scoping Meeting Minutes of
11/7/2022
o Attachment B: Area Wide Study Fee (AWSF) and Off-site
Improvements Memorandum of 8/2/2023
o Attachment C: DelDOT Application Review Commentary for the City
of Dover DAC
• Email of November 14, 2023 from DelDOT, Michael Vandevander with
attachments
o Pre-Submittal – Windward Ridge Meeting Notes from Pre-submittal
conference call on 7/19/2023 with DelDOT Staff
o Area Wide Study Fee (AWSF) and Off-site Improvements
Memorandum of 8/2/2023
This application was originally submitted to the Planning Commission for review
at their October 16, 2023 meeting. Your Meeting Packet already includes the
original submission items of the project reports, comments, plans, etc. A Public
Hearing was conducted on October 16, 2023; and the application was deferred
seeking additional information.
30
Página 31
Item 4.
MORRIS & RITCHIE ASSOCIATES, INC.
ENGINEERS, ARCHITECTS, PLANNERS, SURVEYORS,
AND LANDSCAPE ARCHITECTS
Date: November 14, 2023
City of Dover Planning and Inspections
City Hall
15 Loockerman Plaza
Dover, DE 19901
Attention: Ms. Dawn Melson-Williams
Subject: Windward Ridge – Traffic
Coordination Summary
Dear Ms. Melson-Williams:
On behalf of our client, Jack Lingo Asset Management, and for the benefit of the members of
the Planning Commission, Morris & Ritchie Associates (MRA) would like to offer the following
information about the communications we have had with the Delaware Department of
Transportation (DelDOT) throughout the development process for the Windward Ridge project.
We ask that you share this correspondence with the members of the Planning Commission in
advance of the hearing scheduled for November 20, 2023.
As you know, the typical process for a new land development project begins with a Traffic
Impact Study Scoping Meeting between the developer and DelDOT. For the Windward Ridge
project, this meeting was held on November 3, 2022 and was attended by six DelDOT
employees representing the Planning and Traffic Divisions, Joe Caloggero of the Traffic Group
(the traffic engineer representing the developer), and yourself on behalf of the City of Dover.
Minutes from this meeting were taken by the DelDOT project engineer, Claudy Joinville, dated
November 7, 2022, and provided to both the developer and the City of Dover. A copy of these
minutes is provided as Attachment A to this letter.
As the minutes show, this meeting discussed the development of the project, the projected
traffic to be generated by the project, the warrants that would need to be met for DelDOT to
require a Traffic Impact Study (TIS) and the qualification for providing an Area Wide Study Fee
(AWSF) in lieu of performing the TIS. As stated in the minutes:
“Following the discussion of current traffic conditions at the intersections that would be
evaluated if a TIS were conducted for the proposed development, the City indicated that it would
not require a TIS and would support DelDOT’s decision to allow the developer to pay the AWSF
in lieu of doing a TIS.”
As is typical for TIS scoping meetings and as reflected in the minutes, this meeting did
include the discussion of current traffic conditions around the proposed development, the
impacts to those areas from the traffic to be generated by the proposed development, and what
18 Boulden Circle, Suite 36, New Castle, DE 19720 (302) 326-2200 Fax: (302) 326-2399 www.mragta.com
Abingdon, MD Baltimore, MD Laurel, MD Towson, MD Georgetown, DE New Castle, DE Purcellville, VA Raleigh, NC Orlando, FL
(410) 515-9000 (443) 490-7201 (410) 792-9792 (410) 821-1690 (302) 855-5734 (302) 326-2200 (703) 994-4047 (984) 200-2103 (407) 317-6288
31
Página 32
Item 4.
Windward Ridge – Traffic Coordination Summary
November 14, 2023
Page 2
the requirements would have been for a TIS. While DelDOT stated that they did not require a
TIS, they did ask the City for their input and as such, both DelDOT and the City of Dover were
aligned in the determination that rather than a TIS, an AWSF payment would be made by the
developer to DelDOT. In addition, the minutes make clear that the developer may be required to
incur additional expenses associated with the proposed development as follows:
“… payment of the AWSF does not preclude the developer from making and/or participating
in off-site improvements. The developer should coordinate with DelDOT’s Subdivision Section
to request a pre-submittal meeting request. DelDOT will supply the developer with an AWSF
letter documenting the amount of the fee and off-site improvements during the pre-submittal
process.”
As directed in the above meeting minutes, during the development of the preliminary plan we
(MRA) reached out to DelDOT to request a pre-submittal meeting. This meeting was held on
July 19, 2023. Following that meeting, DelDOT provided a memorandum dated August 2, 2023,
to address the “Area Wide Study Fee (AWSF) and Off-site Improvements.” This document is
provided as Attachment B, and begins with the following statement:
“The subject development meets DelDOT’s volume warrants to pay the Area Wide Study Fee
in lieu of doing a Traffic Impact Study (TIS).”
The memorandum continues to list requirements for the developer, both financial and
specific improvements related to the proposed development, as part of the project approval
process. The final item in this memo (#5) addresses the option for the developer to become part
of the proposed Cheswold Area Transportation Improvement District (TID). Doing this would
allow the developer to pay a single fee to DelDOT to cover its obligations for improvements
required for the proposed development, in lieu of providing the improvements listed in the
AWSF memo. However, upon further discussions with DelDOT we learned that this project
does not qualify for the TID because it is located within the City of Dover limits and the City of
Dover has chosen not to participate in the TID.
In addition to the above, DelDOT participated in the City of Dover Development Advisory
Committee review of the Windward Ridge project in October 2023 where the reviewing engineer
provided four advisory comments in their letter. This document is provided as Attachment C for
your reference. Of those four comments, #2 clarifies that DelDOT is in support of providing
only one access point for the development and #3 clarifies that DelDOT accepts an AWSF in lieu
of a TIS, consistent with DelDOT’s position as set forth in the TIS Scoping Meeting minutes as
well as the City of Dover’s position on this matter.
Based upon the above, DelDOT’s decision is clear that a TIS is not required for this project
and the City of Dover supported DelDOT’s decision. We understand that the PLUS review
comments provided by DelDOT in the PLUS review letter dated August 23, 2023, can be
confusing as they are general comments, containing references to sections of the DelDOT
Development Coordination Manual instead of specific requirements applicable to the proposed
development. It should be understood that the PLUS comments are typically provided well
32
Página 33
Item 4.
Windward Ridge – Traffic Coordination Summary
November 14, 2023
Page 3
before the formal TIS Scoping Meeting where DelDOT’s engineers have the opportunity to
review the specific impacts of the proposed development and make a determination as to what
the developer should be required to do as it relates to the traffic generated by the proposed
development. With Windward Ridge, the pre-application meeting and PLUS review were held
less than two weeks from each other and therefore the comments from PLUS did not reflect the
specifics discussed during the pre-application meeting.
As part of a site plan review, the Planning Commission is tasked with certain objectives, as
outlined in Article 10, Section 2 of the Zoning Code. Specifically related to traffic, Section 2.21
states as follows:
2.21 Maximum safety and convenience of vehicular, transit, bicycle and pedestrian traffic by
ensuring that all proposed and impacted streets, driveways and walkways are adequate, but not
excessive in number adequate in width, grade, alignment, capacity, and visibility, and suitably
located, particularly with respect to their connection to public streets.
The internal private street system within the proposed development will be designed to meet
the City’s standards. Both internal and off-site vehicular and pedestrian traffic are addressed
with safety in mind. In addition, the access point for the subdivision is located on a state-
maintained road which is within the jurisdiction of DelDOT. Access is being provided at the
safest possible position, as agreed upon by DelDOT and reflected in DelDOT’s comments to the
City for the Development Advisory Committee review where they state:
“The proposed entrance for this subdivision is located at a position that provides the most
sight distance in each direction. The department is in support of a single access point. This will
provide the safest ingress/egress to the site, and maximize the use of the sight distance.”
West Denneys Road is owned by DelDOT and therefore the maintenance, design, and
approval for improvements to that road are under the sole purview of DelDOT. DelDOT will be
requiring the developer to improve a portion of W. Denneys Road as part of the Windward Ridge
project. The curved portion will be upgraded to provide wider driving lanes and shoulders on
both sides and allow for longer sight distances through the curves near the proposed entrance.
All of these improvements will provide increased safety for vehicular and pedestrian travelers, in
accordance with DelDOT’s requirements.
The proposed entrance location for the Windward Ridge subdivision onto W. Dennys Road
has been designed with consideration given to the surrounding properties and existing nearby
entrances. The process for determining the safety of this project’s entrance and for providing
nearby road improvements has been discussed and approved by both the City of Dover and
DelDOT. The location of the entrance has been reviewed and approved by DelDOT.
33
Página 34
Item 4.
Windward Ridge – Traffic Coordination Summary
November 14, 2023
Page 4
We trust that the information provided in this letter addresses the concerns raised by
members of the Planning Commission during the hearing held on October 16, 2023. We will be
happy to address any additional questions at the hearing scheduled for November 20, 2023.
Very Truly Yours,
MORRIS & RITCHIE ASSOCIATES, INC.
Charles Barnett,
Principal
Enc.: Attachment A: Traffic Impact Study Scoping Meeting Minutes
Attachment B: Area Wide Study Fee (AWSF) and Off-site Improvements Memorandum
Attachment C: DelDOT Application Review Commentary for the City of Dover DAC
Cc: Doug Motley, Jack Lingo Asset Management
Joe Caloggero, The Traffic Group
Pamela Scott, Saul Ewing, LLP
File (21905)
34
Página 35
Item 4.
Attachment A
Traffic Impact Study Scoping Meeting Minutes
35
Página 36
Item 4.
Nicole Majeski
secretary
MEMORANDUM
TO: File
FROM: Claudy Joinville, Project Engineer
DATE: November 7, 2022
SUBJECT: Windward Ridge
Traffic Impact Study (TIS) – Scoping Meeting Minutes (11/3/2022)
ATTENDANCE: Dawn Melson-Williams, City of Dover
Joe Caloggero, The Traffic Group, Inc.
Sarah Coakley, DelDOT Planning
Mark Galipo, DelDOT Traffic
Olayiwola Okesola, DelDOT Planning
Ryan Schroder, DelDOT Planning
Annamaria Furmato, DelDOT Planning
Claudy Joinville, DelDOT Planning
This memorandum is to document the subject TIS scoping meeting that occurred on
November 3, 2022. The subject land is proposed to be developed as a subdivision of 40 single-
family detached houses and 264 units of multi-family mid-rise housing on an approximately 41.40-
acre assemblage of parcels (Tax Parcels 2-00-05600-01-4000-00001, 4100-00001, and 4200-
00001).
The land for the proposed residential development is currently split-zoned as RM (Multi-
family Residential) and AR (Agricultural Residential) in Kent County, and the developer plans to
annex the land into the City of Dover under RM-2 (Medium Density Residence) zoning with an
SWPOZ (Sourced Water Protection Overlay Zone).
The subject land, to be developed by Jack Lingo Asset Management, LLC, is located on
the north side of W. Denneys Road (Kent Road 100), approximately 2,150 feet east of the
intersection with Kenton Road (Kent Road 104).
36
Página 37
Item 4.
Memorandum to File
November 7, 2022
Page 2 of 2
At the start of the meeting, DelDOT, the City of Dover, and the developer’s Consultant
discussed that while the proposed residential development meets DelDOT’s warrants for a TIS, it
would qualify for payment of the Area Wide Study Fee (AWSF) in lieu of doing a TIS as it would
generate fewer than 2,000 trips per day and fewer than 200 peak hour trips. DelDOT informed the
developer’s Consultant that DelDOT would only be amenable to payment of the fee if the City of
Dover does not require a TIS. In addition to the AWSF, DelDOT, the City and the developer’s
Consultant discussed potential off-site improvements that may be required of the developer as well
as the potential need for a Traffic Operational Analysis (TOA).
Following the discussion of current traffic conditions at the intersections that would be
evaluated if a TIS were conducted for the proposed development, the City indicated that it would
not require a TIS and would support DelDOT’s decision to allow the developer to pay the AWSF
in lieu of doing a TIS.
The developer’s Consultant decided to pursue payment of the AWSF in lieu of a TIS; as
such, a scope of work for a TIS was not established. DelDOT does not anticipate requiring the
developer to conduct a TOA. However, payment of the AWSF does not preclude the developer
from making and / or participating in off-site improvements. The developer should coordinate with
DelDOT’s Subdivision Section to request a pre-submittal meeting request. DelDOT will supply
the developer with an AWSF letter documenting the amount of the fee and off-site improvements
during the pre-submittal process.
By copy of this memorandum I ask those copied to contact me at (302) 760-2124 or
Claudy.Joinville@delaware.gov regarding any significant errors or omissions. The Consultant
should request any revisions to this memorandum through the PDCA.
CJ:cjm
cc: Mary Ellen Gray, Director, City of Dover
Pam Steinebach, Director, DelDOT Planning
Todd Sammons, Assistant Director, Development Coordination
Wendy Polasko, Subdivision Engineer, Development Coordination
Sireen Muhtaseb, TIS Group Manager, Development Coordination
37
Página 38
Item 4.
Attachment B:
Area Wide Study Fee (AWSF) and Off-site
Improvements Memorandum
38
Página 39
Item 4.
N ic o l e M a j e s k i
s e c r e ta r y
MEMORANDUM
TO: Will Mobley, Acting Kent County Review Coordinator
FROM: Sireen Muhtaseb, TIS Group Manager
DATE: August 2, 2023
SUBJECT: Windward Ridge
(Protocol Tax Parcel # 2-00-05600-01-4000-00001)
Area Wide Study Fee (AWSF) and Off-site Improvements
The subject development meets DelDOT’s volume warrants to pay the Area Wide Study
Fee in lieu of doing a Traffic Impact Study (TIS). This memorandum is to address the amount of
that fee and the off-site improvements that should be required of the developer in the absence of
a TIS. The fee and improvements presented below are an alternative to the developer doing a TIS
and the improvements identified through DelDOT’s review of that study.
1. The proposed development consists of 300 dwelling units of multi-family low-rise
housing. Based on our review, using Land Use Code 220 of the 11 th edition of the
Institute of Transportation Engineers’ (ITE) Trip Generation Manual, the proposed
development would generate 1,998 average vehicle daily trips (ADT) and 150 vehicle
trips during the p.m. peak hour. The fee is calculated at ten dollars per daily trip. For the
proposed development, the fee would be $19,980.
2. The developer shall improve the State-maintained road(s) on which they front, within the
limits of their frontage, to meet DelDOT’s standards for their Functional Classification as
found in Section 1.1 of the Development Coordination Manual and elsewhere therein.
The improvements shall include both directions of travel, regardless of whether the
developer’s lands are on one or both sides of the road. Frontage is defined in Section 1 of
the Development Coordination Manual, which states “This length includes the length of
roadway perpendicular to lines created by the projection of the outside parcel corners to
the roadway.” Questions on or appeals of this requirement should be directed to the
DelDOT Subdivision Review Coordinator in whose area the development is located.
39
Página 40
Item 4.
Mr. Will Mobley
August 2, 2023
Page 2 of 2
3. Section 2.2.2.2 of the Development Coordination Manual allows DelDOT to accept the
AWSF in lieu of a TIS, but only if the local land use agency does not require a TIS. If the
City of Dover requires a TIS for this development, DelDOT will support that requirement
and will not accept the AWSF.
4. The developer shall enter into a traffic signal agreement for the intersection of McKee
Road (Kent Road 156) and W. Denneys Road (Kent Road 100). Or the developer may
contribute to the Traffic Signal Revolving Fund (TSRF) in the amount of $50,026.92.
The developer should coordinate with the DelDOT Subdivision Section to execute the
traffic signal agreement or the TSRF agreement and pay the TSRF amount.
5. The proposed development is located within the boundary of the proposed Cheswold
Area Transportation Improvement District (TID). The TID is still under development and
is anticipated to become operational at the end of year 2023/early 2024. Although the
subject property is within the Cheswold Area TID, the developer would be required to
participate in the TID only if they submit a plan to DelDOT for approval after the TID is
operational. For more information on the status of the Cheswold Area TID, the developer
should contact Sarah Coakley, Principal Planner, within DelDOT’s Statewide & Regional
Systems Planning, by phone at 302-760-2236 or email at Sarah.Coakley@delaware.gov.
If you have any additional questions or comments, please let me know.
SM: km
cc: Nick Hammonds, Jack Lingo Asset Management, LLC
Rob Grenon, Morris & Ritchie Associates, Inc.
Mary Ellen Gray, Director, City of Dover
Michael Simmons, Chief of Project Development South, DOTS
Wendy Carpenter, Traffic Calming & Subdivision Relations Manager, Traffic, DOTS
Sean Humphrey, Traffic Engineer, DelDOT Traffic, DOTS
Matthew Lichtenstein, Central District Engineer, Central District
Steve McCabe, Central District Public Works Manager, Central District
Sarah Coakley, Principal Planner, Statewide & Regional Systems Planning, Planning
Todd Sammons, Assistant Director, Development Coordination, Planning
Wendy Polasko, Subdivision Engineer, Development Coordination, Planning
Michael Vandevander, Subdivision Reviewer, Development Coordination, Planning
Annamaria Furmato, TIS Group Engineer, Development Coordination, Planning
Tanner Chiamprasert, Johnson, Mirmiran, & Thompson, Inc.
40
Página 41
Item 4.
Attachment C:
DelDOT Application Review Commentary for
the City of Dover DAC
41
Página 42
Item 4.
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
T
===============================================================
APPLICATION: Windward Ridge Apartments
FILE#: S-23-19 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Michael Vandevander PHONE#: 302-760-2141
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
No person, firm, corporation or the like shall construct, open, reconstruct, maintain, modify or use any
crossing or entrance onto a state-maintained highway, street or road, including any drainage modifications
leading into or carried by the highway drainage system, without first having complied with standards and
regulations adopted by the Department and having obtained a permit issued by the Department.
Please contact the Delaware Department of Transportation - Development Coordination section to begin
permit process.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
1. A pre-submittal meeting with DelDOT is required to further discuss the project.
2. Site Access. The proposed entrance for this subdivision is located at a position that
provides the most sight distance in each direction. The Department is in support of a
single access point. This will provide the safest ingress/egress to the site, and maximize
the use of the sight distance.
3. Although DelDOT's TIS warrants are met, DelDOT may accept an Area Wide Study Fee
(AWSF) since the site would generate fewer than 2,000 ADT and fewer than 200 peak
hour trips in lieu of a TIS if the Local Land Use Agency does not require a TIS. Please
provide documentation stating that the LLUA does NOT require a TIS. Upon receipt of
this, DelDOT will issue an AWSF letter stating the required fee and improvements for
this project.
4. There is an existing single home on the southwest corner of the project site. This home
is to remain. The proposed pedestrian facility (Shared Use Path SUP) will stop at the
eastern portion of this existing lot. Continuing the SUP is not advised due to the limited
site area. The Department is willing to accept a Permanent Easement at that location.
42
Página 43
Item 4.
From: Vandevander, Michael (DelDOT)
To: Melson-Williams, Dawn; Charles Barnett
Cc: Mobley, Will (DelDOT); Polasko, Wendy (DelDOT)
Subject: EXTERNAL: Windward Ridge
Date: Tuesday, November 14, 2023 1:59:02 PM
Attachments: 2023-7-19 - Windward Ridge DelDOT Presubmittal Meeting Minutes (1).docx
2023-08-02_Windward-Ridge_AWSF_Offsite-Requirements - Memo (2).doc
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dawn,
Good afternoon, I have attached meeting minutes and the AWSF to clarify that Mr. Charles Barnett
from Morris & Ritchie Assoc. INC has been in contact with DelDOT on the Windward Ridge Project. A
pre-submittal meeting was held 19 July 2023 at 1:30pm. On 02 August 2023, an Area Wide Study
(AWSF) was completed. Also, there was Traffic Impact Study (TIS) – Scoping Meeting on 03
November 2022. Please forward this email to the planning commission as to clarify any doubt they
may have in reference to this project. Any questions or concerns please advise.
V/R
Michael
Michael Vandevander
Kent County Reviewer
Development Coordination/Planning/DELDOT
302-760-2141
michael.vandevander@delaware.gov
43
Página 44
Item 4.
MORRIS & RITCHIE ASSOCIATES, INC.
ENGINEERS, ARCHITECTS, PLANNERS, SURVEYORS,
AND LANDSCAPE ARCHITECTS
Pre-Submittal – Windward Ridge
Wednesday, July 19, 2023, 1:30 PM
Attendees:
Michael Vandevander, Wendy Polasko, Will Mobley, Steve McCabe, Linda
DelDOT:
Osiecki, Rachel Goff, Sean Humphrey, David Heckman
MRA: Robert Grenon, Charlie Barnett
Topics of Discussion
Windward Ridge – Pre-submittal conference call to discuss proposed improvements
for West Denneys Road frontage and entrance improvements
MRA Discussion:
Robert Grenon provided project overview of the proposed Windward Ridge residential
project. The project is located in City of Dover on West Denneys Road. Total project will
have 300 apartment dwelling units. The road was engineered in 1933 per DelDOT contract
#319 as crowned and not super-elevated. Per topo and field observation the western portion
of the S-curve is constructed as crowned and the east curve is constructed as super-elevated.
DelDOT Observations / Recommendations:
• Will Mobley stated that 11’ lanes and 5’ shoulders are acceptable per the 2022
DelDOT Road Design Manual.
• Wendy Polasko suggested looking into joining the Cheswold TID zone. She
recommended us contacting Sarah Coakley when she returns to the office. This
would eliminate AWS fee and site frontage requirements beyond entrance turn
lanes construction, however the fee is unknown at this time.
• DelDOT stated that if the developer did not join the TID, W. Denneys Road would
need to be improved for the entire projected frontage, which is approximately 1,900
linear feet.
• Wendy Polasko stated that the 40 MPH posted speed is also the design speed.
• Charlie Barnett (MRA) requested DelDOT’s opinion on the City of Dover request
for a 2nd entrance onto West Denneys Road. Will Mobley strongly discouraged this
because of limited access. The code, per the road classification, limits to a 250’
distance from existing driveways. In addition, the road is on an S-curve that is
superelevated and could be unsafe. DelDOT’s general preference is to
consolidate and minimize access points as much as possible.
• Michael Vandevander recommended that MRA look at removing the eastern
access of the residential crescent driveway near Sta 24+20.
• Robert Grenon (MRA) discussed (2) existing utility poles near Sta 22+10 and Sta
28+00 that are within of line of sight. Wendy Polasko stated that because the pole
18 Boulden Circle, Suite 36, New Castle, DE 19720 (302) 326 -2200 Fax: (302) 326-2399 www.mragta.com
Abingdon, MD Baltimore, MD Laurel, MD Towson, MD Georgetown, DE New Castle, DE Leesburg, VA Raleigh, NC 44
(410) 515-9000 (410) 935-5050 (410) 792-9792 (410) 821-1690 (302) 855-5734 (302) 326-2200 (703) 994-4047 (984) 200-2103
Página 45
Item 4.
distances are far enough away from proposed entrance that they wouldn’t be an
obstruction and therefore won’t need to be relocated.
• Wendy Polasko stated that the Shared Use Path limits as designed are satisfactory
and the Permanent Easement limits shown are correct as well.
• Robert Grenon (MRA) suggested to reuse the current East superelevation eMAX
since it appears to have the eMAX similar to current requirements. DelDOT
recommend reviewing this on construction plans.
• Steve McCabe mentioned that the existing 12” RCP culvert depicted near Sta
27+60 is a 15” RCP and can be open cut if it is extended or replaced.
• Steve McCabe stated that the underground gas main and water main would not
need to be replaced and recommended contacting the owners for coordination.
• Steve McCabe required relocation of poles to be outside of the clear zone. Any
existing breakaway telecommunication boxes, mailboxes, fire hydrants, or signs do
not need to be moved. This was confirmed by Wendy Polasko.
• Steve McCabe suggested we have pavement cores performed and obtain
pavement section and mill overlay recommendations from DelDOT.
• Michael Vandevander stated that the next submittal would have a 30-day turn-
around period.
• Meeting ended
45
Página 46
Item 4.
Nicole Majeski
secretary
MEMORANDUM
TO: Will Mobley, Acting Kent County Review Coordinator
FROM: Sireen Muhtaseb, TIS Group Manager
DATE: August 2, 2023
SUBJECT: Windward Ridge
(Protocol Tax Parcel # 2-00-05600-01-4000-00001)
Area Wide Study Fee (AWSF) and Off-site Improvements
The subject development meets DelDOT’s volume warrants to pay the Area Wide Study
Fee in lieu of doing a Traffic Impact Study (TIS). This memorandum is to address the amount of
that fee and the off-site improvements that should be required of the developer in the absence of a
TIS. The fee and improvements presented below are an alternative to the developer doing a TIS
and the improvements identified through DelDOT’s review of that study.
1. The proposed development consists of 300 dwelling units of multi-family low-rise housing.
Based on our review, using Land Use Code 220 of the 11th edition of the Institute of
Transportation Engineers’ (ITE) Trip Generation Manual, the proposed development
would generate 1,998 average vehicle daily trips (ADT) and 150 vehicle trips during the
p.m. peak hour. The fee is calculated at ten dollars per daily trip. For the proposed
development, the fee would be $19,980.
2. The developer shall improve the State-maintained road(s) on which they front, within the
limits of their frontage, to meet DelDOT’s standards for their Functional Classification as
found in Section 1.1 of the Development Coordination Manual and elsewhere therein. The
improvements shall include both directions of travel, regardless of whether the developer’s
lands are on one or both sides of the road. Frontage is defined in Section 1 of the
Development Coordination Manual, which states “This length includes the length of
roadway perpendicular to lines created by the projection of the outside parcel corners to
the roadway.” Questions on or appeals of this requirement should be directed to the
DelDOT Subdivision Review Coordinator in whose area the development is located.
46
Página 47
Item 4.
Mr. Will Mobley
August 2, 2023
Page 2 of 2
3. Section 2.2.2.2 of the Development Coordination Manual allows DelDOT to accept the
AWSF in lieu of a TIS, but only if the local land use agency does not require a TIS. If the
City of Dover requires a TIS for this development, DelDOT will support that requirement
and will not accept the AWSF.
4. The developer shall enter into a traffic signal agreement for the intersection of McKee Road
(Kent Road 156) and W. Denneys Road (Kent Road 100). Or the developer may contribute
to the Traffic Signal Revolving Fund (TSRF) in the amount of $50,026.92. The developer
should coordinate with the DelDOT Subdivision Section to execute the traffic signal
agreement or the TSRF agreement and pay the TSRF amount.
5. The proposed development is located within the boundary of the proposed Cheswold Area
Transportation Improvement District (TID). The TID is still under development and is
anticipated to become operational at the end of year 2023/early 2024. Although the subject
property is within the Cheswold Area TID, the developer would be required to participate
in the TID only if they submit a plan to DelDOT for approval after the TID is operational.
For more information on the status of the Cheswold Area TID, the developer should contact
Sarah Coakley, Principal Planner, within DelDOT’s Statewide & Regional Systems
Planning, by phone at 302-760-2236 or email at Sarah.Coakley@delaware.gov.
If you have any additional questions or comments, please let me know.
SM: km
cc: Nick Hammonds, Jack Lingo Asset Management, LLC
Rob Grenon, Morris & Ritchie Associates, Inc.
Mary Ellen Gray, Director, City of Dover
Michael Simmons, Chief of Project Development South, DOTS
Wendy Carpenter, Traffic Calming & Subdivision Relations Manager, Traffic, DOTS
Sean Humphrey, Traffic Engineer, DelDOT Traffic, DOTS
Matthew Lichtenstein, Central District Engineer, Central District
Steve McCabe, Central District Public Works Manager, Central District
Sarah Coakley, Principal Planner, Statewide & Regional Systems Planning, Planning
Todd Sammons, Assistant Director, Development Coordination, Planning
Wendy Polasko, Subdivision Engineer, Development Coordination, Planning
Michael Vandevander, Subdivision Reviewer, Development Coordination, Planning
Annamaria Furmato, TIS Group Engineer, Development Coordination, Planning
Tanner Chiamprasert, Johnson, Mirmiran, & Thompson, Inc.
47
Página 48
Item 4.
City of Dover
DATA SHEET FOR SITE DEVELOPMENT PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF October 4, 2023
PLANNING COMMISSION MEETING OF October 16, 2023
Plan Title: Windward Ridge Apartments, S-23-19
Plan Type: Site Development Plan and Minor Lot Line Adjustment Plan
Active Recreation Area Plan
Location: North Side of West Denneys Road and west of but not adjacent to West
Denneys Road
Addresses: 57 Rocky Road
4085 West Denneys Road
Unaddressed parcel on north side of West Denneys Road
Tax Parcels: ED-05-056.00-01-02.00-000
ED-05-056.00-01-03.00-000
ED-05-056.00-01-04.00-000
Owners: George L. Craig Jr. and Deborah J. Craig
Robert G. Keller and Gloria K. Keller
Bruce A. Burkett
Equitable Owner/Developer: Jack Lingo Asset Management, LLC
Site Area: Lot A: 3.5 acres +/-
Lot B: 1.01 acres +/-
Remaining Lot Area: 35.61 acres (Project Area)
Total: 40.12 Acres +/-
Zoning: RM-2 (Medium Density Residence Zone and partially subject to
SWPOZ (Source Water Protection Overlay Zone)
Current Use: Two Single Family Detached Dwellings (to remain) and Woodland
Proposed Use: Garden Style Apartments (Multi-family Community)
Dwelling Units: 300 apartment units
Parking for Apartments: Required: 675 spaces and 1 space for office
Proposed: 724 spaces
Water: Tidewater Utilities (in their CPCN)
Sewer: City of Dover
P. O. Box 475 Dover, DE 19903 48
Community Excellence Through Quality Service
Página 49
Item 4.
S-23-19: Windward Ridge Apartments Site Plan
DAC Report of October 4, 2023
Page 2 of 14
For Consideration: Active Recreation Area Plan
Recreation Area: Required – 83,050 SF (1.90 acres+/-)
Provided – 97,360 SF (2.24 acres+/-)
Waiver Requests: Partial Elimination of Sidewalk
Subdivision Waiver for Requirement for Two Connections to Public
Street
49
Página 50
Item 4.
S-23-19: Windward Ridge Apartments Site Plan
DAC Report of October 4, 2023
Page 3 of 14
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: October 4, 2023
APPLICATION: Windward Ridge Apartments on West Denneys Road
FILE #: S-23-19 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Dawn Melson-Williams, Principal Planner PHONE #: (302) 736-7196
I. PLAN SUMMARY:
This application is for Review of a Site Development Plan Application for the construction of a
thirteen (13) garden apartment building complex to be known as Windward Ridge. It consists of
eleven (11) buildings containing twenty-four (24) units and two (2) buildings containing (18)
units for a total of 300 apartment units. Also proposed are twelve (12) garage buildings, a Club
House with Pool, walking paths, parking, and other site improvements. Two (2) existing single
family detached dwellings will remain on separate lots after a Minor Lot Line Adjustment Plan
to reconfigure the three properties. The properties are zoned RM-2 (Medium Density Residence
Zone) and partially subject to the SWPOZ (Source Water Protection Overlay Zone). The subject
site consists of three parcels totaling 40.12 acres +/- located on the north side of West Denneys
Road and west of but not adjacent to Carlisle Drive. The owners of record are George L. Craig
Jr. and Deborah J. Craig; Robert G. Keller and Gloria K. Keller; and Bruce A. Burkett and the
equitable owner is Jack Lingo Asset Management, LLC. Property Addresses: 57 Rocky Road,
4085 West Denneys Road, and an unaddressed parcel on West Denneys Road. Tax Parcels: ED-
05-056.00-01-02.00-000, ED-05-056.00-01-03.00-000, and ED-05-056.00-01-04.00-000.
Council District 1. Review of Active Recreation Area. Waiver Requests: Partial Elimination of
Sidewalk and Subdivision Waiver of Requirement for Two Connections to Public Street.
Existing Properties:
The subject properties are located on the north side of West Denneys Road to the west of the
residential subdivision known as Carlisle Village (Carlisle Village is not within the City).
Adjacent areas to the south of West Denneys Road are within the City of Dover. The three
parcels described below were recently annexed into the City of Dover (AX-22-03).
The Craig property (to be Lot A) includes a dwelling and other accessory structures off a private
drive named Rocky Road. The north portion of the existing lot contains a large woodland area.
The Keller property (to be Lot B) includes an existing single-family detached dwelling directly
adjacent to West Denneys Road and continues to be predominately wooded for the balance of the
parcel. The Burkett property is a wooded lot with no buildings adjacent to Carlisle Village.
These properties are not currently served by City Electric or by City Water & Wastewater
services. An equitable owner has filed an application for redevelopment of the properties for
residential use as an apartment complex.
50
Página 51
Item 4.
S-23-19: Windward Ridge Apartments Site Plan
DAC Report of October 4, 2023
Page 4 of 14
Surrounding Land Uses
To the east, the subject area is adjacent to the residential subdivision of Carlisle Village, an
existing neighborhood of single-family detached dwellings zoned RS1 (in Kent County). To the
south across West Denneys Road is the State owned parkland known as the Anne McClements
Woodland as part of the Fork Branch Nature Preserve; it is zoned ROS (Recreational and Open
Space Zone). Portions of this park area at the southeast corner of the intersection of Kenton Road
and West Denneys Road were previously proposed for development as the Maidstone
Subdivision prior to its donation/sale to the State to expand the park. The area consists of open
fields and wooded areas. To the west of the subject area are other properties zoned AR
(Agricultural Residential District) under the jurisdiction of Kent County including a church,
other single family dwellings, and woodland areas. To the north, is a stream that is part of the
Fork Branch waterway system and another wooded tract.
II. PREVIOUS APPLICATIONS:
The subject area (three properties) was annexed into the City in early 2023 with Application AX-
22-03 Lands of Craig, Keller, and Burkett: Annexation of Three Parcels on West Denneys Road.
At the time of annexation, the properties were rezoned to RM-2 (Medium Density Residence
Zone) and partially subject to the SWPOZ (Source Water Protection Overlay Zone).
III. PROJECT DESCRIPTION:
The Site Development Plan as submitted by the applicant for the Windward Ridge Apartments
consists of thirteen (13) garden style apartment buildings consisting of eleven (11) buildings
containing twenty-four (24) units and two (2) buildings containing eighteen (18) units for a total
of 300 apartment units. Also proposed are twelve (12) garage buildings, a Club House with Pool,
walking paths, parking, and other site improvements. Two (2) existing single family detached
dwellings will remain on separate lots (Lot A and Lot B). The site also has a series of parking
lots and six (6) small garage buildings each with six interior parking spaces. There is a sidewalk
network throughout the site and walking paths/trails connecting to active recreation areas.
The Site Plan (Sheets 1-8 dated 8/15/2023) and the Architectural Drawings and Photo Series Set
(Set of 8 ½” by 14” Sheets) also describes the approaches to the Active Recreation Area Plan
amenities.
Minor Lot Line Adjustment Plan
This Site Plan includes a Minor Lot Line Adjustment Plan (Sheet 2) to reconfigure the existing
three parcels to create a large tract for the apartment development. While the existing single
family detached dwellings will remain each on their own lot. Lot A (Craig) at 57 Rocky Road is
to consist of 3.5 acres+/- and include a single family detached residence and associated accessory
buildings. Lot B (Keller) at 4085 West Denneys Road is to consist of 1.01 acres+/-. The balance
of the properties and the other wooded parcel (Burkett) are the subject area for redevelopment.
Preliminary Land Use Services Review (PLUS)
An application (PLUS Review #2023-07-09) related to this Windward Ridge project was
reviewed by the State’s Preliminary Land Use Services, as required by the City of Dover’s
Memorandum of Understanding (MOU). It was reviewed by the state at the meeting on July 26,
2023. This MOU requires that non-residential developments of over 75,000 square feet or
residential developments containing 125 or more dwelling units complete the PLUS Review
51
Página 52
Item 4.
S-23-19: Windward Ridge Apartments Site Plan
DAC Report of October 4, 2023
Page 5 of 14
process prior to application submission. The development proposal submitted by the developers
to PLUS envisioned 312 apartment units* for the total 40.12 acres. Copies of the PLUS Review
Comments are provided along with the Applicant’s Response to the PLUS Comments.
*Note: The Plan design has since been refined to 300 apartment units.
IV. ZONING REVIEW:
RM-2 (Medium Density Residential Zone)
The properties have the zoning of RM-2 (Medium Density Residence Zone). The types of
permitted uses in the RM-2 (Medium Density Residence Zone) are given in Article 3 §7 of the
Zoning Ordinance and referenced sections including Article 3 §1. One-Family Residence Zones.
The RM-2 zone allows for a variety of housing unit types ranging from single family detached
dwellings, duplexes, multiplexes, and townhouses to garden apartments. The RM-2 zone has a
maximum gross residential density limitation of eight dwelling units per acre. The bulk standards
are found Zoning Ordinance, Article 4 Section 4.6 and are based on the proposed housing type.
SWPOZ (Source Water Protection Overlay Zone)
The subject area is also partially subject to the SWPOZ (Source Water Protection Overlay Zone).
In this case, the SWPOZ: Tier 3 – Excellent Recharge Area crosses through the northern portion
of the subject area. The regulations regarding the Tier 3 - Excellent Recharge Areas of the
SWPOZ can be found in Article 3 §29.79 of the Zoning Ordinance. The proposed use as garden
apartment (residential) is not prohibited in the SWPOZ. For Tier 3: Excellent Recharge Areas, the
maximum lot coverage for the site is 30% unless infiltration is utilized then the maximum lot
coverage is 60%. In the SWPOZ, the differential volume of stormwater between the 30% and 60%
lot coverage must utilize infiltration. The Plan indicates that 18.61 acres of the site is within the
SWPOZ and of that 5.03 acres will be impervious; therefore, an impervious coverage of 27%.
V. PARKING SUMMARY:
The parking requirement for apartments is based on a rate of two (2) parking spaces per dwelling
unit plus 0.25 space per dwelling unit for visitor parking. Based on the number of dwelling units
(300 apartment units), this site would require 675 parking spaces. The plans submitted identify a
total of 724 parking spaces located around the perimeter of the complex flanking the drive aisles
and including handicapped accessible parking spaces near each building. There are also a series
of 12 garage buildings of six spaces each throughout the complex. The Plan also identified EV
parking spaces.
Bicycle Parking
Bicycle parking is required at a ratio of one space for every twenty parking spaces. With 724
vehicle parking spaces, then 37 bicycle parking spaces are required. The site plans submitted
appear to identify six bike rack locations for a total of 42 bike spaces, but no details on format
are provided.
Upright Curbing
The upright cubing for parking lots and drive aisles is required by the requirements of Article 6
Section 3.6(b) of the Zoning Ordinance. The type of curbing must be clarified on the Site Plan.
52
Página 53
Item 4.
S-23-19: Windward Ridge Apartments Site Plan
DAC Report of October 4, 2023
Page 6 of 14
VI. SITE CONSIDERATIONS:
Access
The access to this Apartment Complex is with a divided boulevard style entrance/exit from West
Denneys Road. The entrance drive is named Windward Boulevard which continues throughout
the apartment complex as drive aisles. These drive aisles are named Crosswind Drive, Leeward
Way, and Tradewind Way. These are not rights-of-way or roadways to be dedicated as City
streets.
Subdivision Waiver: Requirement for Two Connections to Public Street
The Land Subdivision Regulations outline requirements for streets in Article VI. Subdivision –
General Requirements and Design Standards, A. Streets. Subsection 8 lists provisions for
interconnected streets including the requirement for two connections to a state or city maintained
street for site developments containing more than 150 or more dwelling units.
Article VI. Subdivision – General Requirements and Design Standards
A. Streets
8. The creation of interconnected streets will be encouraged wherever the commission finds that
such layout will not interfere with traffic convenience and safety. The commission shall
determine the number of connections of streets in the proposed subdivision with existing streets.
At least two connections onto a state-maintained road or a city-maintained street are required
unless the Delaware Department of Transportation or the city engineer determines that the
second connection will not be permitted or is determined to be nonfeasible. This requirement
shall pertain to:
(a) Subdivisions containing 20 or more lots, plots, sites, or parcels.
(b) Site developments containing 150 or more dwelling units.
The Windward Ridge Apartment complex proposes 300 dwelling units. The Plan proposes one
entrance connecting to West Denneys Road in the form of a divided boulevard entry. The
Applicant has filed a written waiver request citing insufficient road frontage to accommodate two
entrances due to length of frontage, the proximity of the existing Carlisle Drive, and the driveway
entrances of the single family dwellings; see attached letter.
The Planning Commission will make a recommendation on this Subdivision Waiver to be
forwarded to City Council for action as per Land Subdivision Regulations, Article VII. Special
Provisions, A. Variance and waiver.
Article VII. Special Provisions
A. Variance and waiver.
1. Upon the findings of the commission that, due to special conditions peculiar to a subdivision or
a site, certain requirements of these regulations are inappropriate, or that strict compliance with
said requirements may cause extraordinary and unnecessary hardships, the commi ssion may
recommend to the city council, and the city council may vary or waive said requirements,
provided that such variance or waiver shall not be detrimental to the public health, safety, or
general welfare, or have the effect of nullifying the intent and purpose of the official map, the
zoning ordinance, the development plan or these regulations. In varying or waiving certain
requirements, the council may specify such conditions as will, in its judgment, secure
substantially the objectives of the requirements so varied or waived.
53
Página 54
Item 4.
S-23-19: Windward Ridge Apartments Site Plan
DAC Report of October 4, 2023
Page 7 of 14
Rear Emergency Access
Rear Emergency Access is required for some residential dwelling types. According to Article 5,
Section 17 of the Zoning Ordinance an 18 ft. wide Secondary Fire Lane or 18 ft. wide subgrade
emergency access lane is required for Apartments that are 2-3 stories to serve as rear access. This is
to provide access to rear building areas. The plan calls for an emergency access lane network to
reach the rear of each apartment building. The Fire Marshal’s Office will also evaluate these fire
protection measures as related to the fire lane requirements of the applicable Fire Codes.
Lighting
The plan must add a series of lighting fixtures to light the parking lots and access ways to the
buildings.
Sidewalks
Sidewalks are shown on the plans between the parking areas and the building access points.
These sidewalks are on the building side of the parking lots and include designated crosswalks at
drive aisle crossings. A sidewalk connects from the multi-use path along West Denneys Road
frontage into the site on the east side of Windward Boulevard. There are also a series of mulch
walking paths the circulate through the woodland areas.
Waiver Request: Partial Elimination of Sidewalks (Pathways)
Sidewalks are required along all street frontages of a property (Zoning Ordinance, Article 5
Section 18) for development proposals subject to Site Development Plan review by the Planning
Commission. Review of the Plan shows a multi-use path along portions of the West Denneys
Road frontage proposed for development of the apartment complex.
A written waiver request was submitted for consideration by the Planning Commission to
eliminate the sidewalk/pathways for the segments of West Denneys Road in front of the existing
single family detached dwellings. The Planning Commission should act on this waiver request as
part of their review of the Site Development Plan; see the following Zoning Ordinance citation
on waivers of pathways. Sidewalks are a type of pathway.
Article 15 §18.5 Waiver of pathway locations requirements. The property owner or developer may
request a waiver from the planning commission or city planner, according to the type of plan
review required by article 10 of this ordinance, under the following circumstances in order to
reduce or eliminate the requirements for pathway installation:
a) When the property is isolated from the existing pathway network, with no existing
pathways within the immediate vicinity of the property.
b) When the proposed use would not generate or attract additional pedestrian, bicycle, or
other non-motorized trips.
c) When physical characteristics of the property are such that pathway installation is
impractical or impossible.
Dumpsters
The Dumpster requirement for apartments is two Dumpsters for the first 48 units and one
Dumpster for each additional 24 units or fraction thereof. Based on 300 apartment units, a total
of thirteen (13) Dumpsters are required. There fourteen (14) Dumpsters within the parking lot
areas. There must be space for both trash and recycling containers in these Dumpsters.
54
Página 55
Item 4.
S-23-19: Windward Ridge Apartments Site Plan
DAC Report of October 4, 2023
Page 8 of 14
VII. BUILDING ARCHITECTURE:
The applicant has submitted example elevations (drawings and photographs of similar buildings)
for the apartment buildings. These are three story buildings with a slightly pitched roof the gable
elements over certain sections. Each unit has a balcony or patio area. The larger buildings have
two points of entry as an open stairwell corridor to access the units on each floor. The exterior
finishes of the apartment buildings consist of a masonry watertable, horizontal vinyl siding with
a band board dividing the second and third floors with a change in siding color. The siding on the
select gable elements is vertical. Architectural asphalt shingles are shown for the pitched roofs.
The Garage Buildings have a masonry watertable and then horizontal vinyl siding for the wall
surface along with an asphalt shingled hipped roof. There are garage doors across the front of the
structure leading to individualized garage bays. Turned gable elements are added to the front of the
garages including the vertical siding similar to the gable end.
VIII. SPECIAL FLOOD HAZARD AREAS
Flood Hazard Area
The Zoning Ordinance, Article 5 §11.21 requires that flood hazard areas (100-year floodplain)
remain as open natural areas with no impervious surfaces. These properties are found on the
FEMA FIRM Panel of Kent County Delaware Map Number 10001C0162H effective date May 5,
2003. Portions of the subject property are within the Special Flood Hazard Area (100-year
floodplain/ 1% chance of annual flooding) as Zone AE; it is found in the northern portion of the
site. The floodplain areas are not proposed for development.
IX. TREE PLANTING AND LANDSCAPE PLAN:
Zoning Ordinance, Article 5 Section 16 lays out the requirements for tree planting and
preservation. A new project is required to provide tree planting at a rate of one (1) tree per 3,000 SF
of “Development Area.” The Zoning Ordinance Article 5, Section 16 defines “Woodland” as
follows:
Woodland. An area of contiguous wooded vegetation (7,500 square feet or greater), where trees
exist at a density of at least one tree with a caliper dimension of six inches or greater per 375
square feet of land and where the tree branches form a contiguous canopy.
According to plans, there are 37.44 acres of existing woods, and they propose to remove a portion
of the woodland area to make way for the buildings development and preserving 19.02 acres of
woodland (50.8%). The maximum amount of woodland that can be cleared is 50% with anything
over that amount requiring mitigation.
Based on a development area of 817,561 SF, the minimum required number of trees is 273. The site
plans show 273 trees spread over the site around the parking lots on islands, adjacent to the
buildings, and in the internal open space areas. The plan does not specify tree species.
Wetlands & Buffering
The Zoning Ordinance, Article 5 §11.22 prescribes provisions related to wetland areas. It
requires setbacks from wetland areas that are over 0.25 acres in size. This plan depicts Non-Tidal
wetland areas. A 100-foot setback is required; however, this can be reduced to 50 feet with
implementation of a Riparian Buffer or reduced to 30 feet with bank stabilization. Adjacent to
the wetlands, the plan shows a 50 foot riparian buffer where existing woodland vegetation will
be maintained. The site circulation drive aisle crosses a small stream in one location and there
are several walking path small (wood) bridge crossings. More detail on these crossings is needed.
55
Página 56
Item 4.
S-23-19: Windward Ridge Apartments Site Plan
DAC Report of October 4, 2023
Page 9 of 14
X. ACTIVE RECREATION AREA
Active Recreation Area Plan Review
The Zoning Ordinance, Article 5 Section 10 sets out requirements to preserve areas of open
space within residential developments which are designed to provide buffer spaces between
developing areas, to preserve existing natural and historic features and to establish a network of
open spaces within the built environment to provide a balance between developed and
undeveloped lands, wildlife habitat conservation, the preservation of scenic view corridors, and
to provide residents opportunities to engage in passive recreational activities. Zoning Ordinance,
Article 5 Section 10.11 notes the purpose of providing Recreation Areas.
Article 5 §10.1 Recreation areas.
10.11 Purpose. The purpose of this section is to ensure that active recreation areas are
provided as an integral design element within residential developments and that such facilities are
of an adequate scale in relation to the size of the residential development and which provide
residents with a variety of active recreational pursuits.
The amount of Active Recreation Area required is 275 SF per dwelling unit which would require
83,050 SF (1.90 acres) of area (using 302 units). An itemized listing of the Recreation Areas and
materials is given on Plan Sheet 8 and example features in the Architectural Packet. The
proposed amenities include a Clubhouse with Pool, Tot Lot Playground, Walking Trails,
Exercise/Picnic Area, and Dog Park Area. See Recreation Plan Review Report for more detailed
review (attached document to be provided).
XI. CITY AND STATE CODE REQUIREMENTS:
The subject proposal has been reviewed for Code compliance, plan conformity, and
completeness in accordance with this agency’s authority and area of expertise. The following
items have been identified as elements which need to be addressed by the applicant:
1) Sidewalks must be provided along the full frontage of West Denneys Road (across all three
properties) unless the Waiver Request is approved for the partial elimination of the sidewalk
across Lot A and Lot B.
2) Two connections to a street must be provided unless the Subdivision Waiver Request is
approved to eliminate the Requirement for the Two Connections to a Public Street.
3) Active Recreation Area: The applicant is responsible for providing an Active Recreation
Area of a minimum of 83,050 SF (rate for 302 units). The Plans Applicant has provided
information indicating they intend to provide 97,360 SF of Active Recreation Area. See
Recreation Plan Review Report for additional comments.
a. Any revisions to the Active Recreation Area must be incorporated into the plan drawing
and data/notes listings throughout the plan set.
b. The Active Recreation Area is scheduled to be reviewed by the Council Committee of the
Whole: Parks, Recreation & Community Enhancement Committee on October 10, 2023.
4) Upright curbing shall be provided around all parking and drive areas in accordance with the
requirements of the Zoning Ordinance unless a waiver is granted by the City Planner. Clarify
the type of curbing proposed.
56
Página 57
Item 4.
S-23-19: Windward Ridge Apartments Site Plan
DAC Report of October 4, 2023
Page 10 of 14
5) Sheet 1 – Cover Sheet:
a. In Site Data Column:
i. Item 3: List information on the size of the existing parcels and the proposed sizes of
each parcel/lot and the specific Project Development Area.
ii. List height of proposed apartment buildings.
iii. List counts by types of parking spaces: regular vehicle, handicapped spaces, EV, and
spaces within garages.
iv. Clarify the size of the project parcel and ensure it is the area utilized for the various
SWPOZ, impervious surface, woodland, and landscape/tree planting calculations.
b. Add City of Dover to title of drawing (in center of page).
c. Add developer/equitable owner Certification note and signature block.
d. General Notes:
i. Clarify if a Homeowners Association or a Property Maintenance entity associated
with the Apartment complex management will be established. Update references in
Notes #1-3.
ii. Check spelling in Notes.
iii. Check contact information for the Kent Conservation District.
iv. Cite source of wetlands delineation.
6) Sheet 2 – Record Plan: A Record Plan sheet was submitted to show the reconfiguration of the
three parcels (Minor Lot Line Adjustment Plan). The Record Plan must include cross access
easements, any easements, or other items affecting the property lines.
a. This sheet must include the appropriate site data column and signature block unless Sheet
1 is to be included as part of the Record Plan set. The City of Dover does not require the
recordation of the entire Site Plan set.
b. Label permanent easements and right-of-way dedications along West Denneys Road.
c. Label remaining Lot (Project Development Area Lot) and its area.
d. Add Special Flood Hazard Area (floodplain) location.
e. Label setbacks for each Lot.
f. List Bulk Standards for garden apartment units.
g. Add SWPOZ (Source Water Protection Overlay Zone) boundary lines.
h. Show any proposed utility easements to bring sanitary sewer and/or water to the
remaining single family detached dwelling unit Lots.
i. Add notes and any waivers received.
7) Sheet 3 – Existing Conditions:
a. Label sizes of wetland areas.
b. Label that West Denneys Road is a State maintained roadway.
c. In Legend identify line as SWPOZ (Source Water Protection Overlay Zone: Tier 3 –
Excellent Recharge Area.)
8) Sheets 4 and 5 - Preliminary Site Plan:
a. Create a distinct match line between plan sheets.
b. Clarify the type of curbing for parking lots and drive aisles.
c. Identify accessible ramps for sidewalk crossings at points of intersection with drive aisles
and at handicapped parking areas.
d. Identify accessible ramps and curb depressions for access to rear emergency access lanes.
57
Página 58
Item 4.
S-23-19: Windward Ridge Apartments Site Plan
DAC Report of October 4, 2023
Page 11 of 14
e. Identify width of walkway trails and sidewalks.
f. Add traffic control signage for fire lanes and handicapped parking signage locations.
g. Identify or note the number of dumpsters to be accommodated in each enclosure.
h. Ensure parking spaces next to garage units can be safely parked in i.e., can a vehicle turn
into the space and exit vehicle.
i. Clarify if any of the EV parking spaces are handicapped accessible.
j. Label locations of bike racks.
k. Entrance design of Windward Boulevard intersection with West Denneys Road is subject
to DelDOT review.
l. Add connecting sidewalks to the playground area and to several of its benches.
m. Add crosswalk to southern of Building 10 at trail crossing.
9) Please provide one or more detail sheets depicting required site details, including but not
limited to bike racks, Dumpsters, stormwater, curbing, and utility details, etc.
10) Please detail any lighting proposed for this site. Show locations to ensure parking lot and
walkway/paths have adequate lighting and include any lights on the buildings.
11) Sheets 6 and 7 Utility Plan:
a. It is noted that the water provider is Tidewater Utilities and will require coordination with
the City’s Department of Water & Wastewater.
b. The plan must show hydrants interior to the site for fire protection.
c. Consider design location of water lines. As depicted, there are lines under garage
buildings and within areas that are designated for the rear emergency access (paths for
fire/emergency response equipment).
12) Sheet 8 – Preliminary Landscape Plan:
a. Confirm the woodland area and woodland clearing amounts on the Development Area
Lot.
b. Add certification notes and design professional signature.
c. Add planting details.
d. Provide details of the Clubhouse and its amenities i.e., surfaces, shade structures, fencing,
etc.
e. Identify specific tree species for proposed trees. Label trees on plan and provide planting
schedule/tally chart.
f. Clarify Dog Park Area as it appears to be placed in a woodland area.
g. Identify any landscape planting plan around each apartment building.
h. Tree placements providing shade to recreation amenity areas is encouraged.
i. Show any required demarcation shrub plantings for rear emergency access lanes.
j. Please be aware of placement of any trees/landscaping with regards to any underground
utilities/storm water management systems and rear emergency access lanes.
13) Provide the distance from the edge of parking/drive aisles to each apartment building. Also
provide dimensions of typical parking spaces and width of access areas to rear emergency
access lanes from parking lot.
14) Provide details on the bridge or culvert crossing of at the non-tidal wetlands/stream.
58
Página 59
Item 4.
S-23-19: Windward Ridge Apartments Site Plan
DAC Report of October 4, 2023
Page 12 of 14
15) Include a detailed outline of the linear feet length of walking path.
16) Note the number of bicycle parking spaces to be provided. Add detail of bike rack.
17) Signs are subject to a separate review and approval process in the City of Dover. There is a
proposed freestanding sign in the median of the entrance (Windward Boulevard). Per the
Sign regulations a monument sign or a post and panel sign may be placed at the entrance of
certain size limitations.
18) Any Erosion & Sediment Control Plans and Stormwater Management Plans granted approval
by the Kent Conservation District must reflect the Site Plan layout and design conditionally
approved by the Planning Commission and be in compliance with the Zoning Ordinance and
technical review requirements of other agencies.
19) The Final Plan set must include notes documenting any action taken by the Planning
Commission regarding any requested waivers and must list any additional conditions of
approval.
20) Additional review comments may be provided in the future as more detailed plans are
developed.
XII. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET
CODE OBJECTIVES:
In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in
considering and acting upon Site Development Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
in subsections 2.21 to 2.28.
1) Waiver Request: Subdivision Waiver for Requirement for Two Connections to Public
Street: Planning Staff recommends approval of the waiver request to eliminate the
requirement for two connections to a public street with the condition that the Apartment
Complex entrance remain as a divided boulevard-like entrance. This is based on the
preliminary comments received from DelDOT regarding options for the entrance design
to connect to West Denneys Road. It noted that there a no options for interconnection
with the adjoining Carlisle Village Subdivision to the east and to the north are floodplain
areas. The only possibility for interconnection would be if any properties to the west or
Lot A/Lot B proposed development in the future. The boulevard-like entrance format
could allow for a potential access/egress option should one lane be blocked by an
emergency.
2) Waiver Request: Partial Elimination of Sidewalks: Planning Staff recommends approval
of the waiver request to eliminate the requirement for the construction of sidewalks along
a segment of the north side of West Denneys Road adjacent to the existing single family
detached dwellings. This is based on the findings of the physical characteristics of this
59
Página 60
Item 4.
S-23-19: Windward Ridge Apartments Site Plan
DAC Report of October 4, 2023
Page 13 of 14
frontage area with existing driveways, trees, and house proximity. Also, this is a segment
unlikely to be traveled by pedestrians as no sidewalks exist to the west. However, if these
properties are redeveloped in the future, then reconsideration of this requirement will be
warranted.
3) Tree Plantings: Planning Staff encourages the use of native tree species especially in
areas adjacent to the existing woodland areas to remain and due to the project’s proximity
to area of the Fork Branch Nature Preserve. The applicant is recommended to consult
with DNREC Staff on appropriate tree species for this area.
4) Bicycle Parking: Planning Staff encourages providing covered bicycle parking
opportunities within the buildings or as an extension of the garage buildings.
5) EV Parking: Planning Staff encourages this project to include the installation of Electric
Vehicle Charging Stations in its parking lot. Currently, the Zoning Ordinance does not
require them, but many other jurisdictions have implemented such requirements and there
also may be State Code requirements for Electric Vehicle Charging Stations. Electric
Vehicle Charging Stations formats include EV-Capable, EV-Ready, and EV-Installed.
a. Ensure some of the EV spaces are handicapped accessible.
b. Clarify if the garage spaces offer EV charging opportunities.
XIII. ADVISORY COMMENTS TO THE APPLICANT:
1) The Planning Commission should act upon the request for any waivers as part of any
motion regarding this project application, or as a separate motion as necessary. Note: All
waivers are at the discretion of the Planning Commission. The Commission may approve
or deny waiver requests. The Subdivision Waiver requires review and action by the
Council Committee of the Whole: Safety Advisory and Transportation Committee and
City Council.
2) In the event, that major changes and revisions to the Site Development Plan occur in the
finalization of the Site Plan contact the Department of Planning and Inspections.
Examples include relocation of site components like paving and increases in floor area.
These changes may require resubmittal for review by the Development Advisory
Committee, Planning Commission, or other agencies and commissions making
recommendations regarding the Plan.
3) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
4) The site is located within the SWPOZ (Tier 3: Excellent Recharge Area) and the Planning
Office and Kent Conservation District will coordinate to ensure compliance.
5) Following Planning Commission approval of the Site Development Plan, the Plan must
be revised to meet all conditions of approval from the Development Advisory Committee
or as otherwise noted. A Check Print must be submitted for review by Planning Office
Staff and the other commenting agencies. Upon determination that the Plan is complete
60
Página 61
Item 4.
S-23-19: Windward Ridge Apartments Site Plan
DAC Report of October 4, 2023
Page 14 of 14
and all agency approvals have been received, copies of the Plan may be submitted for
final endorsement (Final Plan Approval). The Record Plan must be recorded at the Kent
County Recorder of Deeds and a copy returned to the Planning Office prior to Final Site
Plan approval.
6) For building new construction, the requirements of the building code and the fire code
must be complied with. Consult with the Chief Building Inspector and City of Dover Fire
Marshal for these requirements. The resolution of these items may impact the site design
including such items as building dimensions and height, building openings, and fire
protection needs, etc.
7) The applicant/developer shall be aware that prior to any development or ground
disturbing activities on the site the appropriate site inspections and permits are required.
This includes activities to clean up existing vegetation, site grading, etc.
8) The addresses for the new buildings proposed on the property will need to be confirmed
with the City’s Tax Assessment Office. Each apartment building will be addressed using
the named drive aisles of Crosswind Drive, Leeward Way, and Tradewind Way.
9) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections
and permits are required.
10) The applicant shall be aware that Site Plan approval does not represent a Building Permit
and associated construction activity permits. A separate application process is required
for issuance of a Building Permit from the City of Dover. Building Permits will be
required for each building.
11) The applicant shall be aware that Plan approval does not represent a Sign Permit, nor
does it convey permission to place any sign on the premises. Any proposed site or
building identification sign may require a Sign Permit from the City of Dover prior to
placement of any such sign in accordance with Zoning Ordinance, Article 5 §4.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
61
Página 62
Item 4.
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: SEPTEMBER 27, 2023
APPLICATION: Winward Ridge Apartments on West Denneys Road
FILE #: S-23-19
REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater
CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services
CONTACT PHONE #: 302-736-7025
CONTACT PHONE #: jlyon@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
SANITATION
1. The proposed plan will require private trash collection services. A note to this effect is to be added to the plan. Dumpster locations
should also be provided on the plan.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from
Kent Conservation District is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert
elevations must be labeled on all stormwater structures.
3. Please be advised that easements will not be provided for the stormwater infrastructure on this site, it shall be privately
maintained.
STREETS
1. Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted to our
office.
2. The street network is to be private and will not be maintained by the City of Dover.
WATER
1. The certificate of public convenience and necessity (CPCN) for this property is held by Tidewater Utilities. Please obtain
approval from Tidewater Utilities for the water design.
2. If the water source to this property is purchased from the City of Dover, by Tidewater Utilities, potential water infrastructure
improvements may be necessary, depending on the demand of this development.
3. Staff performed a water model study for this development, based on the current unit count, this site would require a twelve-
inch (12”) service line to feed the complex. This assumes that the water is purchased through our water system and not
through a separate water source from Tidewater. Additionally, future requirements may be required when the final water
demand figures are provided.
62
Página 63
Item 4.
Windward Ridge Apartments on West Denneys Road
File #: S-23-19
September 27, 2023
Page 2 of 3
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall discharge or cause
to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff, subsurface drainage,
uncontaminated noncontact cooling water or unpolluted industrial process waters to any sanitary sewer”, this shall include
condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as “…any system used for conveying rain water,
surface water, condensate, cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer, owner
and designers shall ensure during construction that no illegal discharges to the sanitary sewer system are created with the
site improvements.
3. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines. Rim and invert
elevations must be labeled on all sanitary structures.
4. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the right-of-way
and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty cast iron frame and
cover to prevent damage to the cleanout and lateral.
5. Sizing (flow) calculations must be submitted for all sanitary sewer mains showing that velocity and all other requirements are met.
6. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
7. If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County ordinance
requirements, must be provided. A construction detail for the proposed grease trap, as well as the proposed location, must be
provided on the plan.
8. Per the Water / Wastewater Handbook, provisions shall be made to extend sewer service to all adjoining properties, parcels or
lots, regardless of ownership or control of adjoining properties, parcels or lots.
9. The downstream pump station must be evaluated by the developer / engineer to verify it can handle the additional effluent
flow.
10. Provisions shall be made to extend sewer service to all adjoining properties, parcels or lots, regardless of ownership or control
of adjoining properties, parcels or lots.
11. The proposed pump station shall be privately maintained.
12. If adjacent properties connect to the sanitary sewer service in this development, the infrastructure can be installed within an
easement that the city would maintain, this includes the pump station. Please be advised that all infrastructure must be
installed per city requirements for future maintenance by the city.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must
be included as a note on the plan.
2. No trees may be planted within ten feet (10’) of utility infrastructure.
3. No structure may be installed within ten feet (10’) of utility infrastructure, please depict all underground utilities and structures
on the utility plan sheet to confirm compliance.
4. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2018 (.dwg format).
63
Página 64
Item 4.
Windward Ridge Apartments on West Denneys Road
File #: S-23-19
September 27, 2023
Page 3 of 3
b. Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
SANITATION / STORMWATER / STREETS / WATER / WASTEWATER / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
WATER
1. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water &
Wastewater directly to schedule these tests.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated with extending
and providing service and capacity to the proposed development.
2. Prior to plan approval, it may be required to submit the sanitary sewer system plans to the DNREC, Division of Water Resources,
Surface Water Discharges Section for review and approval. The owner/developer is responsible for providing all application fees,
completed forms and plan sets directly to DNREC.
3. Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer and storm sewer
crossings must be shown on the profiles.
4. Wastewater impact fees will be required to be paid prior to Certificate of Occupancy for this project.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned,
flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan
set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist,
which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
SANITATION / STORMWATER / STREETS
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE
P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
64
Página 65
Item 4.
CITY OF DOVER ELECTRIC
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: SEP 27, 2023
APPLICATION: Windward Ridge Apartments on West Denneys Road
FILE #: S-23-19
REVIEWING AGENCY: City of Dover Electric Department
CONTACT PERSON: Shawn Burgett, Engineering Services & System Operations Superintendent
CONTACT PHONE #: 302-674-7568
CONTACT EMAIL #: sburgett@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all existing underground electric, communications and water facilities.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric
Department. Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to
construction. Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
65
Página 66
Item 4.
Windward Ridge Apartments on West Denneys Road
File #: S-23-19
Sep 27, 2023
Page 2 of 2
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook
is now available on the website at the following link: https://evogov.s3.amazonaws.com/media/27/media/13108.pdf.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. This project is outside of the service area for the City of Dover Electric Department. Please save this document for our
general notes if the apartments will be transferred to the city electric department in the future.
2. Provide load sheets if the new load requirements will change as soon as possible to verify proper sizing of transformers
and creation of primary fee estimates. Current load sheets can be found at the following link:
https://www.cityofdover.com/media/Electric%20Department/COD%20Electric%20Load%20Sheet.pdf.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON
AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
66
Página 67
C F
S-23-19
Item 4.
I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 09/27/23 D S
O H
V A
E L
APPLICATION: Windward Ridge Apartments on West Dennys Road
R
FILE #: S-23-19 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
josika@dover.de.us
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed occupancy classification is residential apartments, storage (garages), and assembly
(clubhouse). These comments pertain to the residential apartments.
2. Building Access shall be no further than 50 feet from a primary entrance
Where buildings are provided with an automatic sprinkler system installed in accordance with
NFPA 13, access shall be no further than 100 feet from the primary entrance.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)
3. Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times the
width of the door(s) or for 10 feet, whichever is greater.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
4. Perimeter access shall be 75% and clearly shown on the plans.
Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings of
two or more stories, measured from the face of the building at grade with a maximum slope of ten
percent (10%). Plantings and utility services (includes condenser units, transformers, etc.) shall be
permitted within the perimeter access, and shall not interfere with emergency services fire ground
operations.
If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building
perimeter shall not be included in the calculation of Percent of Perimeter Access.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)
Where parking is located between the building and perimeter access area, parking shall not be
located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall
for building of two or more stories.
67
Página 68
Item 4.
5. Fire lanes shall cover 35% of the proposed building.
Fire lanes are required to be 24 feet wide and run along the front of the building as determined by the
primary entrance(s). In cases where there is more than one primary entrance(s), each shall be served
by a fire lane even if this exceeds the percentage as required.
The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and
the closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one or
two stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in height.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5)
6. Where parking is located between the building and the fire lane, parking shall not be located closer
than 15 feet to the exterior wall.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1)
Where parking is located between the building and the perimeter access area, parking shall not be
located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall
for building of two or more stories. 2021 Delaware State Fire Prevention Regulations, 705, Chapter 5,
3.5.2
7. All Fire Lanes shall be marked as follows:
both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top and
face of the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid yellow
demarcation line shall mark the edge(s) of the fire lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
8. The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware
Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be
suitable for street surfaces
9. Fire lane signs shall be located as follows:
see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150 foot
intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher than
eight feet (8’) above the pavement, signs shall be placed at each end of the fire lane, and signs shall
face all oncoming traffic.
Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in lieu
of fire lane signs and shall conform to the specifications of 7.6.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
10. Where overhangs, canopies, balconies, or any other building or site features must project over any
fire lane, an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall be
provided and the portion of the building perimeter which contains overhangs, canopies, balconies, or
any other building features shall not apply towards the fire lane accessibility requirements of Section
4.0, Table 5-1 in this chapter.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.8)
11. Emergency access to rear building areas compliant with City of Dover Code (Appendix B-Zoning,
Article 5- Supplementary Regulations, Section 17);
all four stories and greater buildings require 24ft fire lane at the rear.
All two to three story apartment structures require an 18ft Secondary Fire Lane at the rear.
68
Página 69
Item 4.
All townhouses (3-8 units with no fire protection) require a 16ft alley or 18ft secondary fire lane at
the rear.
12. Multiple Access Roads shall be provided when a fire department access road (fire lane) is determined
by the Fire Marshal to be impaired by vehicle congestion, condition of terrain, climatic conditions, or
other factors that could limit access such as placement of fire hose from fire equipment.
13. Street width shall be in accordance with City of Dover Code of Ordinances, Appendix A, Article VII,
Section A. 13,
Residential areas
24 feet wide with no parking,
30 feet wide with parking on one side, or
36 feet wide with parking on both sides
Commercial areas
26 feet wide with no parking,
32 feet wide with parking on one side, or
38 feet wide with parking on both sides
Alley
12 feet wide
14. Any dead-end road more than 300 feet in length shall be provided with a turnaround or cul-de-sac as
outlined in the 2021 Delaware State Fire Prevention Regulations 705, chapter 5, 2.3.
15. Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in
reference to this process.
16. Gated Areas: Fire Department access shall be provided to the property through the use of a system or
device approved by the Fire Marshal. The system or device required shall be located in an area
accessible to the fire department and approved by the Fire Marshal. All gates shall be either
automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate. The
owner or their representative shall meet with the Fire Marshal prior to submission to agree on the
system. A letter of agreement shall be created and signed by both parties. The letter shall include a
detailed description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their representative
shall meet with the Fire Marshal prior to submission to agree on the means to open. A letter of
agreement shall be created and signed by both parties. The letter shall include a detailed description
of the manual means to open.
To be considered accessible for fire department apparatus the actual clear openings shall be not less
than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate shall be
setback from the perpendicular street by at least 50 feet.
Please contact this office to discuss options available to comply with this requirement.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
17. Fire hydrants shall be installed per the requirements of City of Dover Public Utilities
Water/Wastewater Handbook, NFPA requirements, and Delaware State Fire Prevention
Regulations. City Ordinance Sec 46-9 (f).
69
Página 70
Item 4.
5.1.1 Hydrant spacing as shown in the Fire Flow Tables shall be used as a general rule. Hydrants shall be
located at the direction of the State Fire Marshal so as to minimize friction in fire hose. All hydrant
spacing shall be located along available roads or at the direction of the State Fire Marshal. This
measurement shall be calculated by way of accessible thoroughfare(s) from the building to be
protected to the hydrant and may not necessarily be a radius. 5.1.3 Additional hydrants shall be
provided when the State Fire Marshal deems it necessary based on the configuration of the site,
building(s), exposures, construction, occupancy, and/or specific hazard(s).
Fire Flow table 2, hydrant spacing shall be 800 feet on center for one and two family detached dwellings,
other residential, rowhouses and townhouses, assembly, health care, business, education, storage,
industrial, mercantile, and mini storage. (702, Chapter 6)
NFPA 1
18.5.2 detached one- and two-family dwellings, fire hydrants shall be provided for detached one- and
two-family dwellings in accordance with both of the following: 1. the maximum distance to a fire
hydrant from the closest point on the building shall not exceed 600 feet 2. the maximum distance
between fire hydrants shall not exceed 800 feet.
18.5.3 buildings other than detached one- and two-family dwellings, fire hydrants shall be provided for
buildings other than detached one- and two-family dwellings in accordance with both of the
following 1. The maximum distance to a fire hydrant from the closet point on the building shall not
exceed 400 feet 2. The maximum distance between fire hydrants shall not exceed 500 feet
18. All fire hydrants shall be marked as prescribed within the appropriate section of this regulation and
as illustrated by the appropriate figures of this regulation.
All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define
specific areas, where fire hydrants are located along a curb line with permitted parking, the area
between the fire hydrant and the street or fire lane shall be stenciled with four inch (4") demarcation
lines and the words "NO PARKING", demarcation lines shall be measured from the center line of the
fire hydrant and extend for a distance 15 feet on both sides.
Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked
vehicles they shall be treated as follows: fire hydrants shall be protected in all directions for a
distance of seven feet (7') with barriers or curbing, Minimum four-inch (4") diameter steel bollards
filled with concrete and marked yellow shall be installed at the outermost corners of the fire hydrant
demarcation area. The minimum height of the bollard shall be 36 inches above the finished grade of
the adjacent surface, and the steamer connection of all fire hydrants shall be positioned so as to be
facing the edge of the street, or traffic lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2)
The owner is responsible if the hydrant is private.
19. Hydrant barrels shall be provided with reflective material, such as paint, durable for
highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel under
the top flange, hydrant bonnets shall be color coded based on the following criteria: class AA 1500
GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 - 999 GPM -
painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM - painted black.
(2021 Delaware State Fire Prevention Regulations 703, Chapter 3. 4)
The owner is responsible if the hydrant is private.
20. Hydrants are to be Darling Co. B-62-B Breakaway https://american-usa.com/products/valves-and-
hydrants/fire-hydrants/5-1-4-american-darling-b-62-b-5
21. NFPA 72 compliant Fire Alarm System required per occupancy code requirements.
70
Página 71
Item 4.
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an
occupancy determined to be a place of assembly by the fire marshal and is capable of receiving an
occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with
NFPA codes governing the installation of fire alarms and the National Electrical Code.
Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined to
be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50 percent of
the assessed value of the building and is capable of receiving an occupant load 75 persons or greater
or is being enlarged to receive an occupant load of 75 persons or greater, shall be required to install
a complete fire alarm system in accordance with NFPA codes governing the installation of fire
alarms and the National Electrical Code.
Public mode audible requirements. To ensure that audible public mode signals are clearly heard by
occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average
ambient sound level or five decibels (dB) above the maximum sound level having a duration of at
least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area required
to be served by the system using the A-weighted scale dBA. In the event the stated requirement
cannot be met a shunt trip relay/switches shall be the approved method of meeting the intent of
this section of the Code.
(City Code of Ordinances 46-171)
22. Sprinkler system required. System is to be monitored by an approved Fire Alarm System.
This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions which
are modified by more than 50% after the effective date of these Regulations. The 50% figure shall be
calculated utilizing the gross square footage of the building, structure, marine vessel, premises and
conditions as to arrive at the correct application.
Any proposal that is presented to the Office of the State Fire Marshal for review and approval for a
building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross square
footage of a non-sprinklered building, may not have another such project for the same building
submitted for review and approval any sooner than three (3) years after the date of the final inspection
unless sprinkler projection is provided throughout the entire building.
In all buildings exceeding 10,000 square feet of aggregate, gross floor area.
In all buildings in excess of 40 feet in height or more than four (4) stories in height.
In all buildings or areas thereof used for the storage, fabricating, assembling, manufacturing,
processing, display or sale of combustible goods, wares, merchandise, products, or materials when
more than two (2) stories or 25 feet in height.
In all basement areas exceeding 2,500 square feet floor area.
In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and exceeding two
(2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or
Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment buildings
storage areas except individual unit closets that are located within individual residential living units.
In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA 101, as adopted
and/or modified by these Regulations. In all buildings or areas classified as "high hazard" under the Life
Safety Code, NFPA 101, or "extra hazard" under the Standard for the Installation of Sprinkler Systems,
NFPA 13, as adopted and/or modified by these Regulations.
All buildings used as dormitories, in whole or in part, to house students at a public or private school
or public or private institution of higher education. (16 Del.C. Ch. 88) This applies to all such
dormitories regardless if new or existing.
(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)
Places of assembly shall be sprinklered throughout in accordance with the most recently adopted
edition of NFPA 13 when the following apply:
All new indoor places of assembly with an occupant load of 150 persons or greater.
71
Página 72
Item 4.
Any interior renovations of 50 percent or more to an existing place of assembly with an occupant
load greater than 150 persons.
Any additions or increase in interior size to an existing place of assembly that would create an
occupant load of 150 persons or greater.
Places of assembly where alcohol is served for consumption on the premises shall be sprinklered
throughout in accordance with the most recently adopted edition of NFPA 13 when the following
apply:
All new indoor places of assembly with an occupant load of 100 persons or greater and where
alcohol will be served for consumption on the premises.
Any interior renovation of 50 percent or more to an existing place of assembly with an occupant load
greater than 100 persons and where alcohol will be served for consumption on the premises.
Any additions or increase in interior size to an existing place of assembly which would create
an occupant load of 100 persons or greater and where alcohol will be served for consumption on
the premises.
New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout in
accordance with the most recently adopted edition of NFPA 13.
(City of Dover Code of Ordinances 46-162)
23. Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow located within
50 feet of main entrance. Access to the Fire Department Connection must be clear unobstructed
access as defined by the AHJ.
Fire department connections. Unless otherwise approved by the fire marshal, fire department
connections shall be on the street side of the building and shall be located and arranged so that
hose lines can be readily and conveniently attached to without interference from any nearby
obstructions as defined by the fire marshal's office. Fire department connections shall be a five-
inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover Fire
Hydrant and within 50 feet of the main entrance of the structure it serves. All fire department
connections shall be not less than three feet nor more than five feet in height above finished grade.
The fire marshal shall have the authority to require more stringent requirements when deemed
necessary. (City of Dover Code of Ordinances 46-162)
24. Parking and/or obstructions shall be prohibited in front of fire department connections for a distance
measuring from the center line and extending four feet on both sides.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
25. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose would
come off the fire equipment.
26. All standpipe and sprinkler connections shall be marked as prescribed within the appropriate
section of this regulation and as illustrated by the appropriate figures of this regulation. All
standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow demarcation
lines to define specific areas, Solid yellow demarcation lines shall be measured from the center line of
the connection and extend for a distance of four feet (4') on both sides, and where parking is allow
between the building and the street or fire lane the solid yellow demarcation lines shall extend from
the end of the sidewalk surface to the street or fire lane (Markings shall not be required on the
sidewalk surface). All fire department connections (standpipe and sprinkler) shall have a minimum
72
Página 73
Item 4.
12" x 18" sign that reads FIRE DEPT. CONNECTION, sign lettering shall be a minimum of 3 inches
(3") in height with red scotchlite letters on white scotchlite background. The sign shall be clearly
visible from the fire lane or roadway, and signs using NFPA international symbols shall be an
acceptable alternative. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)
27. Standpipes shall be provided in all areas and buildings as required in the codes and standards listed
in Regulation 701 as well as the following areas or buildings:
In all Class A and Class B places of assembly and institutional occupancies two (2) stories or 25 feet
in height or over,
In any building over three (3) stories, In any building over 35 feet in height,
In any building that has a floor above the first floor over 10,000 square feet gross floor area,
In all buildings where the 1st floor exceeds 60,000 gross square feet,
a Class I horizontal standpipe system installed in accordance with the applicable codes and
standards listed in Regulation 701 of these Regulations shall be provided. All standpipe systems shall
be installed in accordance with the applicable codes and standards listed in Regulation 701.
The standpipe system shall be carried up with each floor and shall be installed and ready for use as
each floor progresses.
Standpipes shall not be more than one floor below the highest forms of staging,
The 2½-inch of hose connections on Class I systems shall be provided in the following locations, At
the highest intermediate landing between floor levels in every required exit stairway,
Where intermediate landing is not provided, hose connections shall be permitted to be located at the
main floor landings in exit stairways when approved by the authority having jurisdiction,
Where the local fire department has the capability of providing the required pressure, hydraulically
designed standpipe systems in fully sprinklered, non-high-rise buildings shall be designed to provide
the required waterflow rate.
A sign shall be provided at each landing, in all interior stairways, designating the floor level. (2021
Delaware State Fire Prevention Regulations 702, Chapter 4, 2)
28. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators, and
valves located inside structures shall have impact protection, except when located in separate
protected utility rooms.
Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The
bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in concrete at
a minimum of 18 inches surrounding the bollard. The bollards must be a least 48 inches (four ft.) in
height above the finish grade elevation. Any deviation of the stated requirements must be approved
by the fire marshal and/or chief building inspector. The above dimensions shall serve as the
requirement for installation; however, the fire marshal and/or chief building inspector shall have the
authority to require more stringent dimensions to fit the needs of devices warranting impact
protection.
73
Página 74
Item 4.
Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors shall be
of fluorescent or have a reflective coating. Any deviation of the stated requirements must be approved
by the fire marshal and/chief building inspector.
(City of Dover Code of Ordinances, 46-4)
29. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley, shall
have displayed on that wall, in legible, easily read characters which are of contrasting color to the
background, the proper street number for such house, building, or structure in accordance with the
following:
One-family and two-family residential structures, height, the number shall measure a minimum of four inches
in height, location, the number shall be placed on the house above or to the left or right of the front
entrance, color, the number shall be contrasting to the background color, Arabic numerals, all numbers
shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when
identifying individual apartments with exterior doors, and 12 inches when identifying buildings with
apartment complexes where there are two or more buildings not assigned street addresses.
Individual buildings with street addresses shall have numbers measuring six inches, location, numbers
shall be placed either in the center of the building or on the street end of the building so as to be
visible from either the public or private street or from the parking lot, color, numbers shall be
contrasting to the background color, Arabic numerals, all numbers used shall be Arabic numerals.
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in
height, location generally, numbers shall be placed either in the center of the building or on the street
end of the building so as to be visible from either the public or private street or from the parking lot,
property line or driveway, should the building be located far enough from a public or private road so that
the numbers are not clearly visible from the street, then the street address shall also be posted on the
property at or near the property line or driveway to said building,
color; each building, numbers shall be contrasting to the background color and shall be placed on each
building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number
affixed to the front of the tenant space and on the outside of the rear door which corresponds with
that tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
30. A lock box (Knox) containing any and all means necessary for fire department access shall be
provided at the following occupancies: any occupancy that contains a fire alarm signaling system that
is monitored off-site, or any occupancy that contains an automatic sprinkler system.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for any new or
existing building where a fire alarm or sprinkler system is being installed. It shall be the
responsibility of the owner or occupant to keep a set of keys in the secured key box that are
current to the locks of the protected occupancy. Buildings with 24-hour staffing or guard service
shall be exempt from this subsection.
74
Página 75
Item 4.
Location. The secured key system shall be located as close to the main entrance as possible. Should
the building design not allow the secured key system to be located by the main entrance, the fire
marshal and fire chief shall come to an agreement as to an alternate location for the key box. A
secured key system, once installed, shall not be obstructed from view or obstructed by any means
that would delay the fire department access to the box.
Required keys. Keys to be secured in the key box shall include keys to all points of ingress or egress,
whether on the interior or exterior of the building, and keys to locked mechanical rooms, electrical
rooms, elevator rooms, fire alarm and sprinkler controls and any area protected by automatic fire
detection. Keys to individual residential apartment units are not required.
Ordering responsibility. It shall be the responsibility of the general contractor to order the key box for
new buildings. It shall be the responsibility of the owner or tenant to order the key box for existing
buildings.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted before
the installation of a key box.
(City Code of Ordinances 46-127)
Knox Box to be mounted 6 feet above ground level
31. All required means of egress shall have an exit discharge consisting of a non-slip surface and leading
to and terminating at a public way. NFPA 101
32. All new passenger elevators in a building shall be provided with a car sized to accommodate an
ambulance cot 24 inches (609 mm) by 84 inches (2133 mm) in its horizontal open position. Where
two or more new passenger elevators are located in a single hoist way and serve all or the same
portion of the building, only one elevator car that provides a car sized to accommodate an ambulance
cot 24 inches by 84 inches in its horizontal position for each hoist way shall be required. Elevator
cars required to comply with 15.1 or 15.2 shall be identified by the international symbol for emergency
medical services (star of life). The symbol shall be not less than 3 inches (76 mm) in height and shall
be placed inside on both sides of the hoist way door frame. Firefighter recall keys shall be provided in
a manner acceptable to the local fire department. (2021 Delaware State Fire Prevention Regulations
705, Chapter 1, 15)
33. Buildings over 25,000 Sq. Ft are to have radio performance testing done prior to Final CO. This must
be scheduled in advance with an authorized vendor.
34. Project to be completed per approved Site Plan.
35. Full building and fire plan review is required.
36. Separate building permits/plans submission will be required for each building and/or tenant fit out. If
the permit submission is for a “shell” a Certificate of Occupancy will not be issued. Separate plans
and permits submissions will be required for each “tenant fit out” at which time a Certificate of
Occupancy will be issued upon compliance/completion of each “tenant fit out”.
Each “shell” will require a fire permit for sprinkler and fire alarm if applicable. Those systems (for the
“shell”) must be accepted into service prior to any “tenant fit out” fire permits being issued.
37. Construction or renovations cannot be started until building plans are approved.
75
Página 76
Item 4.
38. Fire alarm systems, fire suppression systems, hoods, exhaust ducts, and hood suppression systems
require a fire permit from the Fire Marshal’s Office. This work cannot be started until the permit is
approved.
39. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
40. The following is City Ordinance, Appendix B-Zoning, Article 8 Enforcement and Penalties:
Section 1. - Building permits.
No building or structure in any district shall be erected or structurally altered without a building permit
duly issued upon application to the building inspector. No building permit shall be issued unless the
proposed construction or use is in full conformity with all the provisions of this ordinance. Any building
permit issued in violation of the provisions of this ordinance shall be null and void and of no effect,
without the necessity for any proceedings for revocations or nullification thereof, and any work
undertaken or use established pursuant to any such permit shall be unlawful (see section 4 for
penalties).
1.1 No building permit shall be issued for the construction or alteration of any building upon a lot
without frontage upon, or legal permanent access to, a public street improved to the satisfaction of the
planning commission, or without access to a public sewer.
1.2 No building permit shall be issued for any building where the site development plan of such
building is subject to approval by the planning commission, except upon approval of such plans
approved by the said commission.
1.21 No building permit shall be issued for any building in a subdivision unless the subdivision plot has
been approved by the planning commission.
1.3 No building permit shall be issued for a building to be used for any conditional use in any zone
where such use is allowed only with approval of the planning commission, unless and until such
approval has been duly granted by the said commission.
(Ord. of 7-12-1993, § 3)
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. Please confirm the square footage of the garages to determine perimeter access, fire lane, fire
alarm, and sprinkler requirements.
2. Please confirm the square footage, occupant load, and if alcohol will be permitted at the
clubhouse to determine perimeter access, fire lane, fire alarm, and sprinkler requirements.
3. Please confirm that the Fire Lanes are 24’ wide
4. Fire hydrant locations need to be shown and in compliance with items # 17 and #25 listed
above.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2021 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
76
Página 77
Item 4.
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
T
===============================================================
APPLICATION: Windward Ridge Apartments
FILE#: S-23-19 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Michael Vandevander PHONE#: 302-760-2141
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
No person, firm, corporation or the like shall construct, open, reconstruct, maintain, modify or use any
crossing or entrance onto a state-maintained highway, street or road, including any drainage modifications
leading into or carried by the highway drainage system, without first having complied with standards and
regulations adopted by the Department and having obtained a permit issued by the Department.
Please contact the Delaware Department of Transportation - Development Coordination section to begin
permit process.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
1. A pre-submittal meeting with DelDOT is required to further discuss the project.
2. Site Access. The proposed entrance for this subdivision is located at a position that
provides the most sight distance in each direction. The Department is in support of a
single access point. This will provide the safest ingress/egress to the site, and maximize
the use of the sight distance.
3. Although DelDOT's TIS warrants are met, DelDOT may accept an Area Wide Study Fee
(AWSF) since the site would generate fewer than 2,000 ADT and fewer than 200 peak
hour trips in lieu of a TIS if the Local Land Use Agency does not require a TIS. Please
provide documentation stating that the LLUA does NOT require a TIS. Upon receipt of
this, DelDOT will issue an AWSF letter stating the required fee and improvements for
this project.
4. There is an existing single home on the southwest corner of the project site. This home
is to remain. The proposed pedestrian facility (Shared Use Path SUP) will stop at the
eastern portion of this existing lot. Continuing the SUP is not advised due to the limited
site area. The Department is willing to accept a Permanent Easement at that location.
77
Página 78
KENT CONSERVATION DISTRICT
Item 4.
1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
OCTOBER 2023
APPLICATION: Windward Ridge Apartments on West Denneys Road
FILE #: S-23-19
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Kate Owens
PHONE: (302) 608 – 5370
EMAIL: stormwater@kentcd.org
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY
AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF
EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE
ADDRESSED BY THE APPLICANT:
Source: 2019 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
1. As the disturbance for this site will exceed 1 acre, a detailed sediment and stormwater management plan must
be reviewed and approved by the District prior to any land disturbing activity (i.e. clearing, grubbing, filling,
grading, etc.) taking place. The review fee and a completed Application for a Detailed Plan are due at the time
of plan submittal to the District’s office.
2. A Stormwater Assessment Study (SAS) and pre-application meeting are required prior to submitting for review.
3. The following notes must appear on the record plan:
a) The Kent Conservation District reserves the right to enter private property for purposes of periodic site
inspection.
b) The Kent Conservation District reserves the right to add, modify, or delete any erosion or sediment control
measure, as it deems necessary.
c) A clear statement of defined maintenance responsibility for stormwater management facilities must be
provided on the Record Plan.
ADVISORY COMMENTS TO THE APPLICANT:
1. The District does not recommend this site for development due to numerous site limitations such as areas in the
Excellent Groundwater Recharge Zone, wooded wetlands, and poor soil conditions.
2. The District will require that a preliminary soil investigation be conducted and completed as part of the SAS.
3. The preferred methods of Stormwater management are those practices that maximize the use of the natural
features of a site, promote recharge and minimize the reliance on structural components.
4. A letter of no objection to recordation will be provided once the detailed Sediment and Stormwater Management
Plan has been approved.
78
Página 79
Item 4.
MORRIS & RITCHIE ASSOCIATES, INC.
ENGINEERS, ARCHITECTS, PLANNERS, SURVEYORS,
AND LANDSCAPE ARCHITECTS
Date: August 31, 2023
City of Dover Planning and Inspections
City Hall
15 Loockerman Plaza
Dover, DE 19901
Attention: Ms. Mary Ellen Gray
Subject: Windward Ridge Second Entrance
Waiver Request
Dear Ms. Gray,
On behalf of our client, Jack Lingo Asset Management, Morris & Ritchie Associates (MRA)
respectfully requests a waiver from the requirements of Appendix A, Article 6A8(b) of the City
of Dover Code for the Windward Ridge Subdivision. This section of the code states:
A. Streets
8. The creation of interconnected streets will be encouraged wherever the commission finds that
such layout will not interfere with traffic convenience and safety. The commission shall
determine the number of connections of streets in the proposed subdivision with existing
streets. At least two connections onto a state-maintained road or a city-maintained street are
required unless the Delaware Department of Transportation or the city engineer determines
that the second connection will not be permitted or is determined to be nonfeasible. This
requirement shall pertain to:
b. Site Development containing 150 or more dwelling units.
The proposed entrance for the Windward Ridge subdivision onto W. Dennys Road has been
designed with consideration given to the surrounding properties and existing nearby entrances.
The parcel frontage for the proposed development is limited to less than 390’ with the existing
entrance to the Carlisle Village subdivision located less than 180’ to the northeast and an existing
dual driveway entrance for the remaining single-family residence at 4085 W. Denneys Road.
Based upon these site constraints, there is insufficient road frontage to accommodate two
entrances and maintain safety for the traffic on W. Dennys Road. Additionally, we held a pre-
application meeting with the Delaware Department of Transportation Development Coordination
team on July 19, 2023 and discussed the Code requirement for a secondary access. In this
meeting, DelDOT stated that they would not be in favor of a second access to W. Dennys Road
for this project due to these constraints.
We respectfully request that, based on the above circumstances, the Windward Ridge project
be granted a waiver from the specific requirement of Appendix A, Article 6A8(b) of the City of
Dover Code.
18 Boulden Circle, Suite 36, New Castle, DE 19720 (302) 326-2200 Fax: (302) 326-2399 www.mragta.com
Abingdon, MD Baltimore, MD Laurel, MD Towson, MD Georgetown, DE New Castle, DE Purcellville, VA Raleigh, NC Orlando, FL
(410) 515-9000 (443) 490-7201 (410) 792-9792 (410) 821-1690 (302) 855-5734 (302) 326-2200 (703) 994-4047 (984) 200-2103 (407) 317-6288
79
Página 80
Item 4.
Windward Ridge – Second Entrance Waiver Request
August 31, 2023
Page 2
Thank you for your consideration of this waiver. If you have any questions, please do not
hesitate to contact this office.
Very Truly Yours,
MORRIS & RITCHIE ASSOCIATES, INC.
Charles Barnett,
Principal
Cc: Doug Motley, Jack Lingo Asset Management
File (21905)
80
Página 81
Item 4.
MORRIS & RITCHIE ASSOCIATES, INC.
ENGINEERS, ARCHITECTS, PLANNERS, SURVEYORS,
AND LANDSCAPE ARCHITECTS
Date: August 31, 2023
City of Dover Planning and Inspections
City Hall
15 Loockerman Plaza
Dover, DE 19901
Attention: Ms. Mary Ellen Gray
Subject: Windward Ridge Pedestrian Access
Waiver Request for Lots A & B
Dear Ms. Gray,
On behalf of our client, Jack Lingo Asset Management, Morris & Ritchie Associates (MRA)
respectfully request a waiver from the requirements of Appendix B, Article 5.18.2(a) of the City
of Dover Code for a portion the Windward Ridge Subdivision. This section of the code states:
18.2 Applicability. Sidewalks or other pathways according to the requirements of this section
shall be installed on a property by the property owner or developer under the following
circumstances:
a. When the property is part of a development proposal which is subject to planning commission
site development plan review.
Internal sidewalks are proposed throughout the community to provide pedestrian linkage for
all of the apartment buildings and community amenity areas. We are requesting relief from the
sidewalk requirement as it relates to the two existing residential single-family lots that will
remain (identified as Lot A and Lot B). These two lots will not have access to the apartment
community and will remain as single-family residences which have direct driveway access to W.
Dennys Road.
We held a pre-application meeting with the Delaware Department of Transportation
(DelDOT) Development Coordination team on July 19, 2023 and discussed this issue. DelDOT
stated in this meeting that no sidewalk or shared use path will be required on these two lots by
the developer at this time. A 15’ wide easement for the benefit of DelDOT has been provided
should the Department desire to install additional pedestrian facilities in this are in the future.
We respectfully request that, based on the above circumstances, the Windward Ridge project
be granted a waiver from the specific requirement of Appendix B, Article 5.18.2(a) of the City of
Dover Code as it relates to these two remaining lots.
18 Boulden Circle, Suite 36, New Castle, DE 19720 (302) 326-2200 Fax: (302) 326-2399 www.mragta.com
Abingdon, MD Baltimore, MD Laurel, MD Towson, MD Georgetown, DE New Castle, DE Purcellville, VA Raleigh, NC Orlando, FL
(410) 515-9000 (443) 490-7201 (410) 792-9792 (410) 821-1690 (302) 855-5734 (302) 326-2200 (703) 994-4047 (984) 200-2103 (407) 317-6288
81
Página 82
Item 4.
Windward Ridge – Pedestrian Access Waiver Request
August 31, 2023
Page 2
Thank you for your consideration of this waiver. If you have any questions, please do not
hesitate to contact this office.
Very Truly Yours,
MORRIS & RITCHIE ASSOCIATES, INC.
Charles Barnett,
Principal
Cc: Doug Motley, Jack Lingo Asset Management
File (21905)
82
Página 83
Item 4.
City of Dover
DATA SHEET FOR RECREATION PLAN REVIEW
Review of Active Recreation Area Plan
PARKS, RECREATION AND COMMUNITY ENHANCEMENT COMMITTEE
MEETING OF October 10, 2023
PLANNING COMMISSION MEETING of October 16, 2023
Plan Title: Windward Ridge Apartments, S-23-19
Plan Type: Site Development Plan and Minor Lot Line Adjustment Plan
Active Recreation Area Plan
Location: North Side of West Denneys Road and west of but not adjacent to West
Denneys Road
Addresses: 57 Rocky Road
4085 West Denneys Road
Unaddressed parcel on north side of West Denneys Road
Tax Parcels: ED-05-056.00-01-02.00-000
ED-05-056.00-01-03.00-000
ED-05-056.00-01-04.00-000
Owners: George L. Craig Jr. and Deborah J. Craig
Robert G. Keller and Gloria K. Keller
Bruce A. Burkett
Equitable Owner/Developer: Jack Lingo Asset Management, LLC
Site Area: Lot A: 3.5 acres +/-
Lot B: 1.01 acres +/-
Remaining Lot Area: 35.61 acres (Project Area)
Total: 40.12 Acres +/-
Zoning: RM-2 (Medium Density Residence Zone and partially subject to
SWPOZ (Source Water Protection Overlay Zone)
Current Use: Two Single Family Detached Dwellings (to remain) and Woodland
Proposed Use: Garden Style Apartments (Multi-family Community)
Dwelling Units: 300 apartment units
For Consideration: Active Recreation Area Plan
Recreation Area: Required – 83,050 SF (1.90 acres+/-)
Provided – 97,360 SF (2.24 acres+/-)
P. O. Box 475 Dover, DE 19903 83
Community Excellence Through Quality Service
Página 84
Item 4.
S-23-19: Windward Ridge Apartments Active Recreation Area Plan Review for Parks and Recreation Meeting of
October 10, 2023
Page 2 of 6
I. PROJECT SUMMARY:
The project proposes construction of Windward Ridge Apartments on West Denneys Road. This
is a Site Development Application S-23-19 for the construction of thirteen (13) garden style
apartment buildings consisting of eleven (11) buildings containing twenty-four (24) units and
two (2) buildings containing eighteen (18) units for a total of 300 apartment units. Also proposed
are twelve (12) garage buildings, a Club House with Pool, walking paths, parking, and other site
improvements. Two (2) existing single family detached dwellings will remain on separate lots
after a Minor Lot Line Adjustment Plan to reconfigure the three properties. The properties are
zoned RM-2 (Medium Density Residence Zone) and partially subject to the SWPOZ (Source
Water Protection Overlay Zone). The subject site consists of three parcels totaling 40.12 acres
+/- located on the north side of West Denneys Road and west of but not adjacent to Carlisle
Drive. The owners of record are George L. Craig Jr. and Deborah J. Craig; Robert G. Keller and
Gloria K. Keller; and Bruce A. Burkett and the equitable owner is Jack Lingo Asset
Management, LLC. Property Addresses: 57 Rocky Road, 4085 West Denneys Road, and an
unaddressed parcel on West Denneys Road. Tax Parcels: ED-05-056.00-01-02.00-000, ED-05-
056.00-01-03.00-000, and ED-056.00-01-04.00-000. Council District 1. For Consideration:
Active Recreation Area Plan. Waiver Requests: Partial Elimination of Sidewalk and Subdivision
Waiver of Requirement for Two Connections to Public Street.
This subject area was annexed with Application AX-22-03 Lands of Craig, Keller, and Burkett:
Annexation of Three Parcels on West Denneys Road in early 2023.
II. ACTIVE RECREATION AREA PLAN SUMMARY:
The Site Development Plan as submitted for the Windward Ridge Apartment Complex notes a
variety of Active Recreation features, as well as walking paths throughout the woodland areas.
This information is provided to show how the Site Plan submitted is achieving the aims set out in
the Zoning Ordinance, Article 5 Section 10: Open space, recreation, and other public facilities.
The amount of Active Recreation Area required is 275 SF per dwelling unit which would require
83,050 SF (1.90 acres) of area (using 302 units). An itemized listing of the Recreation Areas and
materials is given on Plan Sheet 8 and example features in the Architectural Packet. The
proposed amenities include a Clubhouse with Pool, Tot Lot Playground, Walking Trails,
Exercise/Picnic Area, and Dog Park Area. See Summary Table below of Active Recreation
Areas.
Active Recreation Area (Article 5 §10.1)
Required Provided on Plan
275 S.F. per dwelling unit or ½ • Clubhouse Area with Pool and Amenities Areas
acre (21,780 SF) whichever is (27,240 SF)
greater to be provided on site. • Tot Lot Playground (5,565 SF)
• Walking Trails (20,670 SF)
302 DU = 83,050 SF (1.90 acres) • Exercise/Picnic Area (21,525 SF)
Required = 83,050 SF • Dog Park Area (22,360 SF)
Provided: 97,360 SF (2.24 acres) Also: Bike Racks
84
Página 85
Item 4.
S-23-19: Windward Ridge Apartments Active Recreation Area Plan Review for Parks and Recreation Meeting of
October 10, 2023
Page 3 of 6
Article 5 Accessible The Clubhouse with Pool is in the central portion of the site
§10.151 plan and reachable via the sidewalk system from the
apartment buildings. The Tot Lot Playground is also near the
sidewalk system and has benches for sitting.
The Clubhouse has interior spaces of an Office and Business
Center, Fitness Center, Yoga Room, Restrooms, and a Great
Room with Games Tables, TV Lounge, and Social Functions
spaces. The exterior spaces in addition to the Pool are seating
area, outdoor kitchen/grill area, social gathering/eating areas,
game area for cornhole and bocce, and shade structure
features.
10.152 Pedestrian oriented There are walking paths through the woodland areas outlined
in the Site Plan. Staff would like to see measurements on the
linear feet of walkways.
One walking trail leads to a Dog Park Area.
10.153 Age Oriented The types of recreation areas outlined in the plans show the
ability for a variety of users from the Tot Lot Playground to
Clubhouse and Pool and Walking Trails.
10.154 Parking The parking is provided for the apartment buildings and is
adjacent to the sidewalk system for the complex.
10.155 Walking, jogging There are 6 bike rack locations on the Site Plan providing 42
and biking trails spaces. The requirement is 1 bike space for every 20 car
spaces (Article 6, Section 3 of the Zoning Ordinance). They
are in compliance with the 37 minimum bike spaces
requirement.
The walking trail system has a mulch surface.
10.156 Setbacks The recreation areas on these Site Plans follow the setback
requirements as they are internal to the site.
A portion of the Dog Park areas should be removed from the
wetland buffer area.
10.157 Landscaping The site requires 273 trees and there is the appropriate
number listed on the plan. Specific tree species will need to
be identified on the plans and signed off by a Landscape
Architect as per Zoning Ordinance.
The site will preserve 19.02 acres of woodland of the 37.44
acres of existing woodlands. No development will occur in
the wetland areas or Special Flood Hazard Area (floodplain).
10.158 Area The breakdown of the allotted recreation areas is listed on
Sheet 8 of the Site Plan. The dimension measurements of
each recreation amenity should be provided to confirm the
listed land area.
85
Página 86
Item 4.
S-23-19: Windward Ridge Apartments Active Recreation Area Plan Review for Parks and Recreation Meeting of
October 10, 2023
Page 4 of 6
III. REVIEW PROCESS
The Planning Office has prepared this Active Recreation Area Report outlining the Recreation
Area proposal. The Parks, Recreation and Community Enhancement Committee will need to
consider the proposed Active Recreation Area and make a recommendation. The Planning
Commission must act to accept the Recreation Area Plan as part of the Site Plan review process.
The Parks, Recreation and Community Enhancement Committee will review the Recreation Area
Plan at their meeting on October 10, 2023. The Planning Commission Public Hearing and
Review of the Site Development Plan S-23-19 and the Recreation Area Plan is scheduled for
October 16, 2023.
IV. CODE CITATIONS:
Dover Code of Ordinances, Appendix B – Zoning, Article 5 – Supplementary Regulations,
Section 10 – Open Space, Recreation and Other Public Facilities (select excerpts).
Article 5 Section 10
Section 10. - Open space, recreation, and other public facilities.
The City of Dover shall require the reservation of open space, recreation, and other public facilities in
accordance with the provisions of this section as a condition of approval for all one-family dwelling,
two-family dwelling and multiple-family dwelling residential developments requiring conditional use
approval, site development plan approval, or land subdivision approval by the City of Dover Planning
Commission.
10.1 Recreation areas.
10.11 Purpose. The purpose of this section is to ensure that active recreation areas are
provided as an integral design element within residential developments and that such facilities are
of an adequate scale in relation to the size of the residential development and which provide
residents with a variety of active recreational pursuits.
10.12 Dedication required. The commission shall require the dedication or reservation of
recreation areas, and the subsequent construction of recreation facilities of a character, extent
and location suitable to the needs created by a development for recreation facilities as defined
and in accordance with the design guidelines set forth.
10.13 Definition. The following are illustrative of the types of recreation areas and subsequent
facilities that shall be deemed to serve active recreational needs and therefore to count toward
satisfaction of the recreation area requirements of this section: tennis courts, handball courts,
racquetball courts, swimming pools, saunas and exercise rooms, meeting or activity rooms within
clubhouses, baseball and soccer fields, basketball courts, volleyball courts, swings, slides and
play apparatus, and developed walking, jogging or biking trails.
10.14 Recreation area review….
10.15 Design guidelines…
10.16 Area required. All residential developments shall provide recreational areas in a size
equal to 275 square feet per dwelling unit or one-half acre of land, whichever is greater. In no
case shall the commission require that more than ten percent of the gross are a of the
development be so dedicated or reserved when the gross area is greater than five acres.
86
Página 87
Item 4.
S-23-19: Windward Ridge Apartments Active Recreation Area Plan Review for Parks and Recreation Meeting of
October 10, 2023
Page 5 of 6
V. STAFF RECOMMENDATIONS
The following are comments and recommendations from staff of the Planning Office following
review of the Active Recreation Area Plan.
1) Provide size (dimensions) of each recreation area amenity. Based on 302 dwelling units
(when including the two existing single family detached dwellings), a total of 83,0500 SF
of Active Recreation Area must be provided. As presented, the Plan has met the area
requirement. Clarify if Lot A and B will be allowed access to these amenities.
2) The Site Plan overall is showing pedestrian connectivity among the various buildings,
amenities, and across the drive-aisles and the parking lot areas.
3) Active Recreation Area: As a residential development, there is a requirement for Active
Recreation area(s). Staff Recommends the following regarding these Recreation Areas:
a. Clubhouse: The Clubhouse offers a number of function spaces for exercise, game
play, and socializing both on the interior and the exterior surrounding the Pool.
i. Ensure appropriate pool security systems are in place.
ii. Add exterior access gates to fenced pool area.
iii. Provide details of the Clubhouse and its amenities i.e., surfaces, shade
structures, fencing, etc.
b. Playground: Plans submitted show that there are proposed features identified as a Tot
Lot, but further information is needed as to what specific playground amenities are
proposed.
i. It should also be noted what material is intended for the ground cover.
ii. Add connecting sidewalk to reach benches.
c. Walking Trails: Two walking trail/path systems are proposed: one in the southwest
woodland area and one near the northern stormwater management pond.
i. Include the linear feet length of walking path.
ii. Provide construction details for surface material, width, and edge
treatment of walking trails.
d. Dog Park: The Dog Park is located within the woodland area along one of the
walking trails. It is proposed to be fenced.
i. Provide details of fence design. Alter shape of fenced area to remove it
from the wetland buffer area.
ii. Identify any amenities of Dog Park such as fenced areas, gate entry
system, trash/waste disposal, rules of usage, etc.
e. Exercise/Picnic Area: Clarify the location of this amenity.
f. Bicycle Parking: Bicycle parking should be located near each Apartment Buildings. If
any Bike Parking facilities are proposed internal to the buildings, then the Plans
should note as such.
i. Staff recommends adding bike racks near each recreation amenity,
especially the Clubhouse.
ii. Staff encourages providing covered bicycle parking opportunities within the
87
Página 88
Item 4.
S-23-19: Windward Ridge Apartments Active Recreation Area Plan Review for Parks and Recreation Meeting of
October 10, 2023
Page 6 of 6
buildings or as an extension of the garage buildings.
g. Pedestrian Facilities Internal to the Site/ Connectivity: The layout of the proposed
sidewalks internal to the site are generally good.
i. Make sure to connect the bike racks and the recreation areas directly to the
pedestrian paths or sidewalks.
ii. Add Pedestrian marked crossings where sidewalks and trails cross drive aisle.
Add at trail crossing south of Building 10.
iii. Ensure curb cuts or ramps shown on sidewalks near drive aisle crossings; add
accessible ramps where necessary.
iv. Ensure wooden footbridge crossings do not impact wetland areas.
h. Adequate Lighting for the Site: Please detail the light fixtures to be used and add
lighting to the parking lots.
i. Landscaping: Specific tree species will need to be identified on the plans and signed
off by a Landscape Architect as per Zoning Ordinance.
i. Tree placement providing shade to recreation amenity areas is encouraged.
VI. ADVISORY COMMENTS
1) This Site Development Plan set depicting the Recreational Areas are to include appropriate
improvements, plans, and details of the Active Recreation Area as approved.
2) There shall be provisions which ensure that the community space (all areas under
consideration for Active Recreation Areas) shall continue as such and be properly managed
and maintained. The developer shall either retain ownership and responsibility for
maintenance of the common use areas or provide for and establish one (1) or more
organizations for the ownership and maintenance of all common space i.e., a Homeowners
Association or other property management entity. The organization shall be responsible for
maintenance, insurance, and taxes on the community space.
3) In the event, that major changes and revisions to the Plan occur in the finalization of the Plan
contact the Planning Office. Examples include reorientation of buildings, relocation of site
components, changes in floor area or unit count, or design revisions impacting Active
Recreation Areas. These changes may require resubmission for review by the Development
Advisory Committee, Planning Commission, or other agencies and commissions making
recommendations in regard to the plan.
4) The Parks, Recreation, and Community Enhancement Committee shall submit to the
Planning Commission a report detailing the recommendations as to the Recreation Area Plan.
Attachments:
• Select Sheet from Site Plan S-23-19: Sheet 1 – Title Sheet, Sheet 3 – Existing Conditions
Plan, and Sheet 8 – Conceptual Landscape & Active Recreation Plan
• Architectural Drawings and Photo Series Set
88
Página 89
Item 4.
STATE OF DELAWARE
OFFICE OF MANAGEMENT AND BUDGET
OFFICE OF STATE PLANNING COORDINATION
August 23, 2023
Charlie Barnett
Morris & Ritchie Associates, Inc.
8 W Market Street
Georgetown, DE 19947
RE: PLUS Review – 2023-07-09; Windward Ridge
Dear Mr. Barnett:
Thank you for meeting with State agency planners on July 26, 2023 to discuss the Windward
Ridge project. According to the information received, you are seeking review of a proposed site
plan for the construction of 13 garden apartment buildings totaling 312 units on three parcels
totaling 40.12 acres zoned RM-2 (Medium Density Residential).
Please note that changes to the plan, other than those suggested in this letter, could result in
additional comments from the State. Additionally, these comments reflect only issues that are
the responsibility of the agencies represented at the meeting. The developers will also need to
comply with any Federal, State, and local regulations regarding this property. We also note
that as the City of Dover is the governing authority over this land, the developers will need to
comply with any and all regulations/restrictions set forth by the City.
Strategies for State Policies and Spending
The proposed project is located in investment Levels 1 and 2 according to the 2020 Strategies
for State Policies and Spending.
Investment Level 1 reflects areas that are already developed in an urban or suburban fashion,
where infrastructure is existing or readily available, and where future redevelopment or infill
projects are expected and encouraged by State policy. Investment Level 2 reflects areas where
growth is anticipated by local, county, and State plans in the near-term future. Because
development in Levels 1 and 2 is consistent with the 2020 Strategies for State Policies and
Spending, the Office of State Planning Coordination supports this site plan, provided it meets all
requirements of the City of Dover.
122 Martin Luther King Jr. Blvd. South – Haslet Armory Third Floor Dover, DE 19901
Phone (302)739-3090 Fax (302) 739-5661 www. stateplanning.delaware.gov
89
Página 90
Item 4.
PLUS review 2023-07-09
Page 2 of 19
Code Requirements/Agency Permitting Requirements
Department of Transportation (DelDOT) – Contact Stephen Bayer 302-760-4834
• Any site access points onto State maintained roads must be designed in accordance with
DelDOT’s Development Coordination Manual, which is available at
http://www.deldot.gov/Business/subdivisions/index.shtml?dc=changes.
• Pursuant to Section 1.3 of the Manual, a Pre-Submittal Meeting is required before plans
are submitted for review. The form needed to request the meeting and guidance on
what will be covered there and how to prepare for it is located at
https://www.deldot.gov/Business/subdivisions/pdfs/Meeting_Request_Form.pdf?0802
2017.
• Section 1.7 of the Manual addresses fees that are assessed for the review of
development proposals. DelDOT anticipates collecting the Initial Stage Fee when the
record plan is submitted for review and the Construction Stage Fee when construction
plans are submitted for review.
• Per Section 2.2.2.1 of the Manual, Traffic Impact Studies (TIS) are warranted for
developments generating more than 500 vehicle trip ends per day or 50 vehicle trip
ends per hour in any hour of the day. Using the 11th edition of the Institute of
Transportation Engineers’ Trip Generation Manual, DelDOT estimates that the subject
development will not generate traffic volume sufficient to require a TIS. The traffic
volume expected would require an Area Wide Study Fee (AWSF).
• Section 2.2.2.2 of the Development Coordination Manual provides that for
developments generating less than 2,000 vehicle trip ends per day and less than 200
vehicle trip ends per hour in any hour of the day, DelDOT may accept an AWSF in lieu of
the TIS if the local government does not require a TIS. The AWS Fee is calculated as $10
per daily trip. AWS Fees are used to fund traffic studies, not to build improvements.
• As necessary, in accordance with Section 3.2.5 and Figure 3.2.5-a of the Manual, DelDOT
will require dedication of right-of-way along the site’s frontage. By this regulation, this
dedication is to provide a minimum of 30 feet of right-of-way from the physical
centerline of West Denneys Road. By this regulation, this dedication is to provide a
minimum of 30 feet of right-of-way from outmost edge of the through lanes of West
Denneys Road. The following right-of-way dedication note is required, “An X-foot wide
strip of right-of-way from the centerline is hereby dedicated in fee simple to the State
of Delaware, acting by and through the Delaware Department of Transportation.”
90
Página 91
Item 4.
PLUS review 2023-07-09
Page 3 of 19
• In accordance with Section 3.2.5.1.2 of the Manual, DelDOT will require the
establishment of a 15-foot wide permanent easement across the property frontage.
The location of the easement shall be outside the limits of the ultimate right-of-way.
The easement area can be used as part of the open space calculation for the site. The
following note is required, “A 15-foot wide permanent easement is hereby dedicated
in fee simple to the State of Delaware, acting by and through the Delaware
Department of Transportation.”
• Referring to Section 3.4.2.1 of the Manual, the following items, among other things, are
required on the Record Plan:
o A Traffic Generation Diagram. See Figure 3.4.2-a for the required format and
content.
o Notes identifying the type of off-site improvements, agreements (signal, letter)
contributions and when the off-site improvements are warranted.
• Section 3.5.4.2 of the Manual addresses requirements for Shared Use Paths (SUP) and
sidewalks. For projects in Level 1 and 2 Investment Areas, installation of paths or
sidewalks along the frontage on State-maintained roads is required.
• In accordance with Section 3.8 of the Manual, storm water facilities, excluding filter
strips and bioswales, shall be located a minimum of 20 feet from the ultimate State
right-of-way along all frontage roads.
• In accordance with Section 5.2.9 of the Manual, the Auxiliary Lane Worksheet should be
used to determine whether auxiliary lanes are warranted at the site entrances and how
long those lanes should be. The worksheet can be found at
http://www.deldot.gov/Business/subdivisions/index.shtml.
• In accordance with Section 5.4 of the Manual, sight distance triangles are required and
shall be established in accordance with American Association of State Highway and
Transportation Officials (AASHTO) standards. A spreadsheet has been developed to
assist with this task. It can be found at
http://www.deldot.gov/Business/subdivisions/index.shtml.
• In accordance with Section 5.14 of the Manual, all existing utilities must be shown on
the plan and a utility relocation plan will be required for any utilities that need to be
relocated.
91
Página 92
Item 4.
PLUS review 2023-07-09
Page 4 of 19
Department of Natural Resources and Environmental Control (DNREC) – Contact Beth Krumrine
302-735-3480
Disclaimer Clause: Staff from the Delaware Department of Natural Resources and
Environmental Control (DNREC) reviewed the project submitted for PLUS review. The absence
of comments regarding specific resources does not indicate that there are not additional
constraints or environmental issues on site, nor does it indicate DNREC support of a project.
Concerns Identified Within the Development Footprint
Wetlands and Subaqueous Lands
Maps from the Statewide Wetlands Mapping Project indicate the potential presence of non-
tidal wetlands on the site. The application indicates that wetlands have been delineated. The
U.S. Army Corps of Engineers sign-off is completed. The application does not propose direct
impacts to the wetlands. The forested wetlands on this property could support an array of
plants and animals, most notably wetland dependent species such as amphibians.
Requirements:
• If the site design changes and dredge or fill of wetlands or subaqueous lands becomes
necessary, permitting and/or authorization requirements may apply.
Federal Contact: U.S. Army Corps of Engineers (Dover Office) at (267) 240-5278.
Website: https://www.nap.usace.army.mil/Missions/Regulatory/Contacts/
State Contact: DNREC Wetlands and Subaqueous Lands Section at (302) 739-9943.
Website: https://dnrec.alpha.delaware.gov/water/wetlands-subaqueous/
Vegetated Buffer Zones
Site plans show a 30-foot vegetated buffer along non-tidal wetlands. Vegetated buffer zones
placed adjacent to waterways and wetlands help improve water quality by reducing sediment
and pollutants loads. They also provide valuable habitat and can help prevent encroachment of
human activities into ecologically sensitive areas. Vegetated buffers are not equivalent to
setbacks, as residential lots, walkways, and stormwater management facilities should not be
contained within the vegetated buffer zone.
Requirements:
• The applicant must comply with minimum vegetated buffer widths as identified
within county and municipal codes.
Contact: DNREC Wildlife Species Conservation & Research Program at (302) 735-3600.
Website: https://dnrec.alpha.delaware.gov/fish-wildlife/contact-information/
92
Página 93
Item 4.
PLUS review 2023-07-09
Page 5 of 19
Special Flood Hazard Area
According to the newest Flood Insurance Rate Maps (FIRM), the northern portion of this parcel
is situated within a Special Flood Hazard Area, specifically within the mapped 100-year
floodplain (1% annual chance of flooding). The Special Flood Hazard Area identified on the site
lies within zone A. In lands contained within the 100-year floodplain, the National Flood
Insurance Program's floodplain management regulations must be enforced through the local
floodplain ordinance, which can have higher standards. There are no structures or features
proposed within the floodplain.
Requirements:
• The applicant must comply with the local floodplain ordinance and regulations
applicable to development or construction within the 100-year floodplain. In
determining the boundary of the floodplain, use the most recent FIRM maps available,
which can be found at https://floodplanning.dnrec.delaware.gov/
Contact: DNREC Shoreline and Waterway Management Section at (302) 739-9921.
Website: https://dnrec.alpha.delaware.gov/watershed-stewardship/waterways/floodplains/
Stormwater Management
The project proposes greater than 5,000 square feet of land disturbing activities and will be
subject to Delaware’s Sediment and Stormwater Regulations.
Requirements:
• A Sediment and Stormwater Plan must be developed, then approved by the appropriate
plan review agency prior to any land disturbing activity taking place on the site. For this
project, the plan review agency is the Kent Conservation District.
• Additionally, to address federal requirements, construction activities that exceed 1.0
acre of land disturbance require Construction General Permit coverage through
submittal of an electronic Notice of Intent for Stormwater Discharges Associated with
Construction Activity. This form must be submitted electronically
(https://apps.dnrec.delaware.gov/enoi/, select Construction Stormwater General
Permit) to the DNREC Division of Watershed Stewardship, along with the $195 fee.
• Schedule a project application meeting with the appropriate plan review agency prior to
moving forward with the stormwater and site design. As part of this process, you must
submit a Stormwater Assessment Study.
Plan review agency contact: Kent Conservation District at (302) 608-5370.
Website: http://kentcd.org/
93
Página 94
Item 4.
PLUS review 2023-07-09
Page 6 of 19
General stormwater contact: DNREC Sediment and Stormwater Program at (302) 739-9921.
E-mail: DNREC.Stormwater@delaware.gov.
Website: https://dnrec.alpha.delaware.gov/watershed-stewardship/sediment-stormwater/
Hydrologic Soils Group
Hydrologic Soil Group soils (poorly drained) have been identified in the site. These soil types are
typically not conducive to utilizing infiltration stormwater Best Management Practices such as
bioretention and infiltration basins, which must meet minimum infiltration requirements.
Requirements:
• Any stormwater Best Management Practices that propose the use of infiltration or
natural recharge shall include a soils investigation.
Contact: DNREC Sediment and Stormwater Program at (302) 739-9921.
E-mail: DNREC.Stormwater@delaware.gov.
Website: https://dnrec.alpha.delaware.gov/watershed-stewardship/sediment-stormwater/
Excellent Groundwater Recharge Area
An Excellent Groundwater Recharge Area is located on the central portion of the site. These
areas have soils that are conducive to water infiltrating downward from surface water
into groundwater. Preservation of these areas is important for replenishing groundwater
supplies and ensuring drinking water for future generations.
Requirements:
• The applicant must comply with all county and municipal requirements for construction
and uses in Excellent Groundwater Recharge Areas.
Contact: DNREC Source Water Assessment and Protection Program at (302) 739-9945.
Website: https://dnrec.alpha.delaware.gov/water/supply/ground-water-protection/
Wildlife Displacement
Development of this site is anticipated to displace local wildlife. Delaware is home to a rich
array of wildlife species, which greatly depend on forests and other habitat types for food,
water and cover.
Requirements:
• Future residents are not permitted to discharge firearms within 100 yards (300 feet)
of any occupied dwelling or building to hunt or remove nuisance wildlife.
Contact: DNREC Division of Fish and Wildlife at (302) 739-9912
Website: https://dnrec.alpha.delaware.gov/fish-wildlife/wildlife/
94
Página 95
Item 4.
PLUS review 2023-07-09
Page 7 of 19
Nutrient Management Plan
This project proposes open space of 26 acres.
Requirements:
• A nutrient management plan is required for all persons or entities who apply nutrients
to lands or areas of open space of 10 acres or more.
Contact: Delaware Department of Agriculture’s Nutrient Management Program at (302) 698-
4558.
Website: https://agriculture.delaware.gov/nutrient-management/
Delaware Emergency Management Agency (DEMA) – Contact Phillip Cane 302-659-2325
Proposed Project Parcel Flood Concern
• The majority of this parcel is located within an area of Minimal Flood Concern of 1,000
years or greater. However, the northwestern part of the property appears to be in a
Special Flood Hazard Area (SFHA) Flood Zone A, which is a 1% or 100-year flood plain.
The properties themselves do not appear to actually be within a floodplain. No official
requirements here from DEMA.
Parcel Status within County Evacuation Zone Location
• The parcel is not yet located within the 10-mile EPZ for the Salem Nuclear Power Plant.
However, the sections to the southeast of W. Denneys Road are located within Kent
Evacuation Zone D.
Parcel Status within the 10-mile Emergency Planning Zone (EPZ) for the Salem Nuclear Power
Plant
• The parcel is not located within the 10-mile EPZ for the Salem Nuclear Power Plant.
State Historic Preservation Office (SHPO) – Contact Carlton Hall 302-736-7400
• There are no known archaeological sites or known historic or eligible properties in the
project area.
• Wetland permitting may be required for northern portion of the parcel – in which case,
this project should be properly initiated through Section 106 Regulations.
• Probability for precontact archaeological resources is high.
95
Página 96
Item 4.
PLUS review 2023-07-09
Page 8 of 19
• Portions of the area have been archaeologically surveyed. The survey uncovered many
archaeological sites and materials in analogous areas.
• An archaeological survey is recommended.
Delaware State Fire Marshall’s Office – Contact Duane Fox 302-739-4394
This document is for information purposes only and does not constitute any type of approval
from the Delaware State Fire Marshal’s Office
At the time of formal submittal, the applicant shall provide; completed application, fee, and
three sets of plans depicting the following in accordance with the Delaware State Fire
Prevention Regulations (DSFPR):
Fire Protection Water Requirements
• Water distribution system capable of delivering at least 1,000 gpm for 1-hour duration,
at 20-psi residual pressure is required. Fire hydrants with 800 feet spacing on centers.
• Where a water distribution system is proposed for mixed occupancy use sites, the
infrastructure for fire protection water shall be provided, including the size of water
mains for fire hydrants and sprinkler systems.
Fire Protection Features
• All structures over 10,000 Sq. Ft. aggregate will require automatic sprinkler protection
installed.
• Buildings occupied as apartments (multi-family living units comprising of 3 or more
units) will require automatic sprinkler protection installed.
• Buildings greater than 10,000 sq ft, 3-stories or more, over 35 feet, or classified as High
Hazard, are required to meet fire lane marking requirements.
o Show Fire Department Connection location (Must be within 300 feet of fire
hydrant), and detail as shown in the DSFPR.
• Show Fire Lanes and Sign Detail as shown in DSFPR.
• Standpipe systems may be required per DSFPR.
Accessibility
• All premises, which the fire department may be called upon to protect in case of fire,
and which are not readily accessible from public roads, shall be provided with suitable
gates and access roads, and fire lanes so that all buildings on the premises are accessible
96
Página 97
Item 4.
PLUS review 2023-07-09
Page 9 of 19
to fire apparatus. This means that the access road must be constructed so fire
department apparatus may negotiate it.
• Any dead-end road more than 300 feet in length shall be provided with a turn-around or
cul-de-sac arranged such that fire apparatus will be able to turn around by making not
more than one backing maneuver. The minimum paved radius of the cul-de-sac shall be
38 feet. The dimensions of the cul-de-sac or turn-around shall be shown on the final
plans. Also, please be advised that parking is prohibited in the cul-de-sac or turn around.
• The use of speed bumps or other methods of traffic speed reduction must be in
accordance with Department of Transportation requirements.
• The local Fire Chief, prior to any submission to our Agency, shall approve in writing the
use of gates that limit fire department access into and out of the development or
property.
Gas Piping and System Information
• Provide type of fuel proposed and show locations of bulk containers on plan.
Required Notes
• Provide a note on the final plans submitted for review to read “All fire lanes, fire
hydrants, and fire department connections shall be marked in accordance with the
Delaware State Fire Prevention Regulations.”
• Proposed Use
• Alpha or Numerical Labels for each building/unit for sites with multiple buildings/units
• Square footage of each structure (Total of all Floors)
• National Fire Protection Association (NFPA) Construction Type
• Maximum Height of Buildings (including number of stories)
• Note indicating if building is to be sprinklered.
• Name of Water Provider
• Letter from Water Provider approving the system layout.
• Provide Lock Box Note (as detailed in DSFPR) if any buildings are to be sprinklered.
• Provide Road Names, even for County Roads
Please note that this project has not been reviewed for adequacy of emergency responder
(fire, emergency medical services, law enforcement) response.
97
Página 98
Item 4.
PLUS review 2023-07-09
Page 10 of 19
Recommendations/Additional Information
This section includes a list of site-specific suggestions that are intended to enhance the project.
These suggestions have been generated by the State Agencies based on their expertise and
subject area knowledge. These suggestions do not represent State code requirements.
They are offered here in order to provide proactive ideas to help the applicant enhance the site
design, and it is hoped (but in no way required) that the applicant will open a dialogue with the
relevant agencies to discuss how these suggestions can benefit the project.
Department of Transportation (DelDOT) – Contact Stephen Bayer 302-760-4834
• The applicant should expect a requirement that all PLUS and Technical Advisory
Committee (TAC) comments be addressed prior to submitting plans for review.
• Please be advised that the Standard General Notes have been updated and posted to
the DelDOT website. Please begin using the new versions and look for the revision dates
of March 21, 2019 and March 16, 2021. The notes can be found at
https://www.deldot.gov/Business/subdivisions/
Department of Natural Resources and Environmental Control (DNREC) – Contact Beth Krumrine
302-735-3480
Wetlands and Subaqueous Lands
• As proposed for this project, do not disturb wetland areas. Wetlands are a critical part
of our natural environment. They reduce the impacts of flooding, absorb pollutants, and
improve water quality. Wetlands provide habitat for animals and plants and many
contain a wide diversity of life, supporting plants and animals that are found nowhere
else.
• Maintain input to natural wetlands at the pre-construction level. Avoid causing an
increase or decrease in the naturally occurring water level.
• Avoid diverting surface water from roadways and stormwater facilities into the wetlands
on site. Water quality could be detrimentally affected by run-off, which can contain oil
and other pollutants.
• Avoid installing sewers with grates, which can create a hazard for amphibians and
reptiles.
98
Página 99
Item 4.
PLUS review 2023-07-09
Page 11 of 19
• Design the development to exclude curbs. If road curbing is part of the design, curbing
that allows small animals, such as turtles and salamanders, to climb out of the roadbed
(such as Type 2 or Cape Cod curbing) is preferred over steep, vertical curbing.
• Use open bottom box culverts to allow for natural substrate to remain and in-water
passage of aquatic life. Additionally, culverts should be left as wide as possible to ensure
that salamanders can travel through them.
Federal Contact: U.S. Army Corps of Engineers (Dover Office) at (267) 240-5278.
Website: https://www.nap.usace.army.mil/Missions/Regulatory/Contacts/
State Contact: DNREC Wetlands and Subaqueous Lands Section at (302) 739-9943.
Website: https://dnrec.alpha.delaware.gov/water/wetlands-subaqueous/
Vegetated Buffer Zones
• Expand the 30-foot buffer to no less than 100 feet from the edge of wetlands and all
waterways to protect water quality and to provide an additional margin of safety for
flooding.
• Vegetated buffer zones should be left undisturbed during construction and should be
identified outside of the Limit of Disturbance on the engineering plans. In some
instances, stormwater outfalls, conveyances, and emergency spillways may cross
through these zones, and will require temporary disturbance during construction.
• Vegetated buffer zones should be deeded as community open space. Signage should be
installed at the edge and within the buffer zones to deter residents from encroaching
into these common areas.
• Maintain vegetated buffer zones as either grasslands/meadows or forest. Buffer zones
should be planted exclusively with native trees and plants. Native plants are well-suited
to our climate and require limited maintenance. They also provide an increasingly
important role in the survival of native birds and beneficial insects whose habitat is
shrinking due to development and climate change.
• Grass cutting for vegetated buffer zones if maintained as meadow should not occur
between April 1st to July 31st to reduce impacts to nesting birds and other wildlife
species that utilize meadows and grasslands for breeding habitat.
Contact: DNREC Wildlife Species Conservation & Research Program at (302) 735-3600.
Website: https://dnrec.alpha.delaware.gov/fish-wildlife/contact-information/
99
Página 100
Item 4.
PLUS review 2023-07-09
Page 12 of 19
Delaware Ecological Network
Most of the project site lies within lands designated within the Delaware Ecological Network, a
statewide network of interconnected lands of significant ecological value. This GIS data layer is
based on principles of landscape ecology and conservation biology, providing a consistent
framework to identify and prioritize areas for natural resource protection. Forest disturbances
on this site will jeopardize habitat on the parcel and likely beyond the parcel’s boundary.
• Removing forested areas within the Delaware Ecological Network should be avoided to
the greatest extent possible. These areas provide wildlife habitat, uptake nutrients,
infiltrate stormwater, and improve water quality. Forests also provide shading and
cooling, while also reducing carbon that contributes to climate change.
Contact: DNREC Wildlife Species Conservation and Research Program at (302) 735-3600.
Website: https://dnrec.alpha.delaware.gov/fish-wildlife/contact-information/
Removal of Mature Forest
The preliminary plan proposes the elimination of approximately 18 of 37 acres of forest on the
site. An analysis of historical data indicates that much of the forest area located on the site has
likely maintained some degree of forest cover since 1937 and could be considered mature
forest. Mature forests possess the potential for rare, threatened, or endangered species that
rely on this type of habitat.
• Removing forested areas for development, especially mature forests, should be avoided
to the greatest extent possible. Forests filter water for improved water quality, provide
habitat for wildlife, absorb nutrients, infiltrate stormwater, moderate temperatures,
and store atmospheric carbon which would otherwise contribute to climate change.
• A forest assessment should be conducted to determine if mature forest resources exist
on the property and to delineate their boundaries. Additionally, a forest assessment
would include the identification of specimen trees and forest-dependent wildlife. If
mature forests are found, these areas should be conserved to the maximum extent
practicable.
• To reduce impacts to nesting birds and other wildlife species that utilize forests for
breeding, it is recommended that tree clearing not occur from April 1st to July 31st.
Likewise, avoid mowing open space areas and grass filter strips during the same
timeframe, as various species of birds utilize these areas for nesting sites.
Contact: DNREC Division of Fish and Wildlife, Species Conservation and Research Program at
(302) 735-3600.
Website: https://dnrec.alpha.delaware.gov/fish-wildlife/conservation/
100
Página 101
Item 4.
PLUS review 2023-07-09
Page 13 of 19
Special Flood Hazard Area
• As proposed, locate all structures outside of the floodplain. If this is not possible, the
developer should consider designing structures to a higher standard to avoid potential
future flood damage and loss.
Contact: DNREC Shoreline and Waterway Management Section at (302) 739-9921.
Website: https://dnrec.alpha.delaware.gov/watershed-stewardship/waterways/floodplains/
Key Wildlife Habitat
The non-tidal coastal plain stream directly adjacent to the property, is mapped as Key Wildlife
Habitat in the Delaware Wildlife Action Plan.
• Key Wildlife Habitat should be conserved to the maximum extent practicable and
negative impacts should be minimized.
• In the interest of water quality and wildlife habitat, we recommend maintaining an
upland buffer of at least 100 ft along rivers, streams and wetlands. This buffer should
not be a maintained lawn area and should not contain lot lines or infrastructure. We
recommend the buffer area be comprised of the existing vegetation or planted with
Delaware native species of trees, shrubs, grasses or wildflowers.
• Appropriate erosion and sediment control measures should be taken during
construction activities to minimize potential impacts to the stream system. For erosion
control, we recommend (if feasible) using materials that are biodegradable and that do
not include plastic netting or have welded-joint poly-based matting. Wildlife
entanglement in rolled erosion control products (RECP), especially those that contain
plastic netting, is well documented.
Contact: DNREC Division of Fish and Wildlife, Species Conservation and Research Program at
(302) 735-3600.
Website: https://dnrec.alpha.delaware.gov/fish-wildlife/conservation/
Stormwater Management
• Where the site and soil conditions allow, integrate runoff reduction techniques including
infiltration basins, bioretention (rain gardens), filter strips, and pavers to encourage on-
site stormwater infiltration and reduce runoff.
• For improved stormwater management, preserve existing trees, wetlands, and passive
open space.
Plan review agency contact: Kent Conservation District at (302) 608-5370.
101
Página 102
Item 4.
PLUS review 2023-07-09
Page 14 of 19
Website: http://kentcd.org/
General stormwater contact: DNREC Sediment and Stormwater Program at (302) 739-9921. E-
mail: DNREC.Stormwater@delaware.gov.
Website: https://dnrec.alpha.delaware.gov/watershed-stewardship/sediment-stormwater/
Drainage
• All existing drainage ditches on the property should be evaluated for function and
cleaned, if needed, prior to the construction of the project.
• Environmental permits or exemptions may be required by the County Conservation
District (Standard Plan), the DNREC Sediment and Stormwater Program (eNOI/NOT),
Army Corp of Engineers, and/or DNREC Wetlands and Subaqueous Lands Section prior
to clearing and/or excavating ditch channels.
• All precautions should be taken to ensure the project does not hinder any off-site
drainage upstream of the project or create any off-site drainage problems downstream
by the release of on-site storm water.
Contact: DNREC Drainage Program at (302) 855-1930.
Website: https://dnrec.alpha.delaware.gov/drainage-stormwater/
Water Quality (Pollution Control Strategies)
This site lies within the Saint Jones River Watershed. Surface water quality in this watershed
does not meet Federal and/or State Water Quality Standards and a Pollution Control Strategy is
in place for this watershed.
• Implement vegetated buffers with a width of at least 100 feet around all water
features on or adjacent to the site.
• Reduce impervious surfaces on the project site by eliminating areas of impervious
pavement and/or using pervious pavement where practicable.
• Reduce stormwater runoff by integrating infiltration basins, bioretention (rain
gardens), filter strips, and by preserving existing trees, wetlands, and passive open
space.
• Reduce the necessity for nutrient application by maintaining open space as
meadow or forest planted exclusively with native plants. Native plants are well-
suited to our climate and require limited maintenance.
102
Página 103
Item 4.
PLUS review 2023-07-09
Page 15 of 19
Contact: DNREC Division of Watershed Stewardship’s Watershed Assessment Section at (302)
739-9939.
Website: https://dnrec.alpha.delaware.gov/watershed-stewardship/
Excellent Groundwater Recharge Area
• For Excellent Groundwater Recharge Areas, limit impervious surfaces to no more than
20% of the entire area designated as having excellent recharge.
Contact: DNREC Source Water Assessment and Protection Program at (302) 739-9945.
Website: https://dnrec.alpha.delaware.gov/water/supply/ground-water-protection/
Wildlife Displacement
• Removing forested areas for development, especially mature forests, should be avoided
to the greatest extent possible. Forests are a key habitat type for wildlife in Delaware.
• Deer, groundhogs, and rabbits will browse on gardens and ornamental landscaping.
Reduce the potential for future conflicts between future residents and wildlife by
maintaining large blocks of forest, as opposed to small pockets of wooded areas.
Contact: DNREC Division of Fish and Wildlife, Species Conservation and Research Program at
(302) 735-3600.
Website: https://dnrec.alpha.delaware.gov/fish-wildlife/wildlife/
Mosquitoes
The project is expected to be impacted by mosquitoes due to its location near large expanses of
wetlands. Mosquito control issues are increasing as developments infringe on wetland areas,
often leading to increased demands for mosquito control services beyond what DNREC has the
resources to provide.
• If necessary, arrange for long-term mosquito control services through a private
company licensed in this area of specialty. In some cases, the DNREC Mosquito Control
Section may be able to provide these services free of charge.
Contact: DNREC Division of Fish and Wildlife, Mosquito Control Section at (302) 739-9917.
Website: https://dnrec.alpha.delaware.gov/fish-wildlife/mosquito-control/
Nature Preserves
The proposed development is located near the Fork Branch Nature Preserve.
• While across the street, there should be an effort made by the developer to ensure
encroachment into the Preserve does not occur. There shall be no staging of equipment
103
Página 104
Item 4.
PLUS review 2023-07-09
Page 16 of 19
on Park property.
• While not currently registered as Natural Area, the property’s proximity to Fork Branch
Nature Preserve suggests that it may share some or all ecological, historical, cultural, or
geologic value as the land within the Nature Preserve. Consider minimizing the
development footprint and dedicating forested and wetland areas as a Nature Preserve
through a conservation easement or donation of land. For more information, please
contact the DNREC Planning Preservation and Development Section.
Contact: DNREC Division of Parks and Recreation, Office of Nature Preserves at (302) 739-9039.
Website: https://dnrec.alpha.delaware.gov/parks/natural-areas/ or
https://dnrec.alpha.delaware.gov/parks/open-space/conservation-easements/
Additional Sustainable Practices
• Install electric vehicle (EV) charging stations for your residents. Residents will
increasingly expect options for EV charging. Installation costs can vary significantly
depending on the parking and electricity distribution at a given location, so it is often
easier and cheaper to plan for the installation at construction, rather than doing costly
retrofits later. The DNREC Division of Climate, Coastal and Energy offers rebates of up to
90% of the cost of the charging station for commercial, multi-unit dwelling and other
public properties. These programs address climate change goals of reducing greenhouse
gas emissions and improving overall air quality
(https://dnrec.alpha.delaware.gov/climate-coastal-energy/clean-transportation/).
• Use renewable energy infrastructure such as solar or geothermal to reduce energy costs
and further reduce pollution created from offsite generation. Grant funds and incentives
are available for Delmarva Power customers through the DNREC Green Energy Fund,
which includes several funding types through the state’s major electric utilities
(https://dnrec.alpha.delaware.gov/climate-coastal-energy/renewable/assistance/).
• Include space for recycling dumpsters within the preliminary site design stage. These
can be placed adjacent to trash dumpsters.
• Incorporate nonmotorized connectivity and install bicycle racks where feasible to help
facilitate non-vehicular travel modes.
• Use efficient Energy Star rated products and materials in construction and
redevelopment. Energy efficient appliances use less energy over time. This saves
consumers and businesses money, while also helping to reduce pollution from power
generation.
104
Página 105
Item 4.
PLUS review 2023-07-09
Page 17 of 19
• Use structural paint coatings that are low in Volatile Organic Compounds to help protect
air quality. Air pollution from new construction is generated through the use of
maintenance equipment, paints, and consumer products like roof coatings and primers.
• Use recycled materials, such as reclaimed asphalt pavement, to reduce heat island
effects on paved surfaces, prevent landfill waste, and lower material costs.
Contact: DNREC Division of Climate, Coastal & Energy at (302) 735-3480.
Website: https://dnrec.alpha.delaware.gov/climate-coastal-energy/
Delaware Emergency Management Agency (DEMA) – Contact Phillip Cane 302-659-2325
Population
• The county has a population density of 310.20 per square mile based on the US 2020
Census report; an increase from 2010 at 271.30 persons per square mile.
• The specific census block(s) the project is located on has a total population of 77,
though, with development, this will undoubtedly change.
• The adjacent blocks aggregate bring the area to a total population of 710.
FEMA National Risk Index
• The FEMA National Risk Index is an online mapping application that identifies
communities most at risk to 18 natural hazards: Avalanche, Coastal Flooding, Cold
Wave, Drought, Earthquake, Hail, Heat Wave, Hurricane, Ice Storm, Landslide, Lightning,
Riverine Flooding, Strong Wind, Tornado, Tsunami, Volcanic Activity, Wildfire, and
Winter Weather. The FEMA National Risk Index is calculated by multiplying the Expected
Annual Loss times the Social Vulnerability and dividing that by the Community
Resilience.
• According to FEMA’s National Risk Index, the parcel is considered relatively low for
overall natural hazards risks.
105
Página 106
Item 4.
PLUS review 2023-07-09
Page 18 of 19
• Community Resilience is a consequence reduction risk component and a community risk
factor that represents the ability of a community to prepare for anticipated natural
hazards, adapt to changing conditions and withstand/recover rapidly from disruptions.
Social Vulnerability is a consequence-enhancing risk factor that represents the
susceptibility of social groups to the adverse impacts of natural hazards.
• Its community resilience and social vulnerability are rated as relatively high.
Renewable Energy Commitment
• Regarding energy use and consumption, the parcel utilizes natural gas as the
predominant fuel type for heating purposes with electric heat a close second.
• DEMA strongly encourages the use of renewable energies and high-efficiency appliances
and utilities. Regarding utilities, DEMA suggests incorporating 90% series furnaces/HVAC
systems; the closer to 99%, the better, as well as A/C units of 20 Seer or greater. DEMA
recommends using tankless water heaters, and battery backup systems for sump pumps
to reduce potential water damage from power failure.
• Lastly, DEMA encourages the integration of modern and emerging technologies, such as
the potential for electric vehicles in garages/parking lots, green roofs where applicable
and allowable, and the like.
Delaware State Housing Authority (DSHA) - Contact Karen Horton 302-739-4263
• DSHA supports the proposal for 312 rental units on 40 acres of land near West Denney’s
Road in Dover. While this is a market-rate development, it provides a more affordable
option for many residents.
• This site is also located within a DSHA-defined “Area of Opportunity” which are strong,
high value markets, with close job proximity and economic opportunity, high performing
schools, amenities and supportive infrastructure that help households succeed.
Unfortunately, these same areas contain little affordable housing. DSHA recommends
that local stakeholders provide resources to connect these residents to the high-quality
services the area has to offer.
• Due to the large scale of this project (40 acres, 312 units), DSHA encourages that the
developer utilizes thoughtful site layout and design measures. This includes measures
that are human-scale and incorporates attractive streetscapes, community recreation
areas, visually appealing façade treatments, and significant landscaping measures. These
elements all serve to create desirable quality communities where families can thrive.
106
Página 107
Item 4.
PLUS review 2023-07-09
Page 19 of 19
Delaware State Fire Marshall’s Office – Contact Duane Fox 302-739-4394
• Although not a requirement of the Delaware State Fire Prevention Regulations, the
Office of the State Fire Marshal encourages home builders to install residential fire
sprinkler systems in all residential dwellings.
• The Office of the State Fire Marshal reminds home builders that they are obligated to
comply with requirements of Subchapter III of Chapter 36 of Title 6 of the Delaware
Code which can be found at the following website:
http://delcode.delaware.gov/title6/c036/sc03/index.shtml
• Preliminary meetings with fire protection specialists are encouraged prior to formal
submittal. Please call for appointment. Applications and brochures can be downloaded
from our website: www.statefiremarshal.delaware.gov, technical services link, plan
review, applications or brochures.
Following receipt of this letter and upon filing of an application with the local jurisdiction, the
applicant shall provide to the local jurisdiction and the Office of State Planning
Coordination a written response to comments received as a result of the pre-application
process, noting whether comments were incorporated into the project design or not and the
reason, therefore.
Thank you for the opportunity to review this project. If you have any questions, please contact
me at 302-739-3090.
Sincerely,
David L. Edgell, AICP
Director, Office of State Planning Coordination
CC: City of Dover
107
Página 108
Item 4.
MORRIS & RITCHIE ASSOCIATES, INC.
ENGINEERS, ARCHITECTS, PLANNERS, SURVEYORS,
AND LANDSCAPE ARCHITECTS
Date: September 29, 2023
Office of State Planning Coordination
122 Martin Luther King Jr. Blvd. South
Dover, DE 19901
Attention: Mr. David Edgell, Director
RE: Windward Ridge PLUS Review 2023-07-09
Dear Mr. Edgell:
We are in receipt of your comment letter dated August 23, 2023 with regard to the proposed Windward
Ridge residential project proposed in the City of Dover and respond as follows:
Strategies for State Policies and Spending
Comment 1: The proposed project is located in investment Levels 1 and 2 according to the 2020
Strategies for State Policies and Spending.
Investment Level 1 reflects areas that are already developed in an urban or suburban
fashion, where infrastructure is existing or readily available, and where future
redevelopment or infill projects are expected and encouraged by State policy. Investment
Level 2 reflects areas where growth is anticipated by local, county, and State plans in the
near-term future. Because development in Levels 1 and 2 is consistent with the 2020
Strategies for State Policies and Spending, the Office of State Planning Coordination
supports this site plan, provided it meets all requirements of the City of Dover.
Response: Comment acknowledged.
Code Requirements/Agency Permitting Requirements
Department of Transportation - Contact Stephen Bayer 302 760-4834
Comment 2: Any site access points onto State maintained roads must be designed in accordance with
DelDOT’s Development Coordination Manual, which is available at
http://www.deldot.gov/Business/subdivisions/index.shtml?dc=changes.
Response: Comment acknowledged; the site access will be designed in accordance with the
Development Coordination Manual.
Comment 3: Pursuant to Section 1.3 of the Manual, a Pre-Submittal Meeting is required before
plans are submitted for review. The form needed to request the meeting and guidance
on what will be covered there and how to prepare for it is located at
https://www.deldot.gov/Business/subdivisions/pdfs/Meeting_Request_Form.pdf?080
2 2017.
Response: Comment acknowledged; the Pre-Submittal Meeting was held on July 19, 2023.
Comment 4: Section 1.7 of the Manual addresses fees that are assessed for the review of development
proposals. DelDOT anticipates collecting the Initial Stage Fee when the record plan is
submitted for review and the Construction Stage Fee when construction plans are
submitted for review.
18 Boulden Circle, Suite 36, New Castle, DE 19720 (302) 326-2200 Fax: (302) 326-2399 www.mragta.com
Abingdon, MD Baltimore, MD Laurel, MD Towson, MD Georgetown, DE New Castle, DE Purcellville, VA Raleigh, NC Orlando, FL
(410) 515-9000 (443) 490-7201 (410) 792-9792 (410) 821-1690 (302) 855-5734 (302) 326-2200 (703) 994-4047 (984) 200-2103 (407) 317-6288
108
Página 109
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 2 of 17
Response: Comment acknowledged; review fees are anticipated to be provided in accordance with
current DelDOT policy.
Comment 5: Per Section 2.2.2.1 of the Manual, Traffic Impact Studies (TIS) are warranted for
developments generating more than 500 vehicle trip ends per day or 50 vehicle trip
ends per hour in any hour of the day. Using the 11th edition of the Institute of
Transportation Engineers’ Trip Generation Manual, DelDOT estimates that the
subject development will not generate traffic volume sufficient to require a TIS. The
traffic volume expected would require an Area Wide Study Fee (AWSF).
Response: Comment acknowledged. Through further discussions with DelDOT we anticipate
providing the AWSF.
Comment 6: Section 2.2.2.2 of the Development Coordination Manual provides that for developments
generating less than 2,000 vehicle trip ends per day and less than 200 vehicle trip ends
per hour in any hour of the day, DelDOT may accept an AWSF in lieu of the TIS if the
local government does not require a TIS. The AWS Fee is calculated as $10 per daily
trip. AWS Fees are used to fund traffic studies, not to build improvements.
Response: Comment acknowledged. Through further discussions with DelDOT we anticipate
providing the AWSF.
Comment 7: As necessary, in accordance with Section 3.2.5 and Figure 3.2.5-a of the Manual,
DelDOT will require dedication of right-of-way along the site’s frontage. By this
regulation, this dedication is to provide a minimum of 30 feet of right-of-way from
the physical centerline of West Denneys Road. By this regulation, this dedication is
to provide a minimum of 30 feet of right-of-way from outmost edge of the through
lanes of West Denneys Road. The following right-of-way dedication note is required,
“An X-foot wide strip of right-of-way from the centerline is hereby dedicated in
fee simple to the State of Delaware, acting by and through the Delaware
Department of Transportation.”
Response: Comment addressed; as shown on the Preliminary Plan, additional right of way has been
noted to be dedicated along West Denneys Road. The Record Plan will include the
requested dedication note in accordance with DelDOT requirements.
Comment 8: In accordance with Section 3.2.5.1.2 of the Manual, DelDOT will require the
establishment of a 15-foot wide permanent easement across the property frontage.
The location of the easement shall be outside the limits of the ultimate right-of-way.
The easement area can be used as part of the open space calculation for the site. The
following note is required, “A 15-foot wide permanent easement is hereby
dedicated in fee simple to the State of Delaware, acting by and through the
Delaware Department of Transportation.”
Response: Comment addressed; the requested easement area has been shown on the Preliminary
Plan. The Record Plan will include the requested easement note in accordance with
DelDOT requirements.
Comment 9: Referring to Section 3.4.2.1of the Manual, the following items, among other things, are
required on the Record Plan:
• A Traffic Generation Diagram. See Figure 3.4.2-a for the required format and
content.
• Notes identifying the type of off-site improvements, agreements (signal, letter)
contributions and when the off-site improvements are warranted.
109
Página 110
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 3 of 17
Response: Comment acknowledged; Record Plans will be prepared in and submitted for DelDOT
review in accordance with current DelDOT requirements.
Comment 10: Section 3.5.4.2 of the Manual addresses requirements for Shared Use Paths (SUP)
and sidewalks. For projects in Level 1 and 2 Investment Areas, installation of paths
or sidewalks along the frontage on State-maintained roads is required.
Response: Comment acknowledged; the Preliminary Plan shows the Shared Use Path as discussed
with, and requested by, DelDOT during the Pre-Application Meeting. The location of
these improvements will be shown on both the Record Plans and Site Entrance Plans in
accordance with current DelDOT requirements.
Comment 11: In accordance with Section 3.8 of the Manual, storm water facilities, excluding filter
strips and bioswales, shall be located a minimum of 20 feet from the ultimate State
right-of-way along all frontage roads.
Response: Comment addressed; all SWM areas are currently shown a minimum of 20’ beyond the
area of DelDOT Right-of-Way dedication.
Comment 12: In accordance with Section 5.2.9 of the Manual, the Auxiliary Lane Worksheet should be
used to determine whether auxiliary lanes are warranted at the site entrances and how
long those lanes should be. The worksheet can be found at
http://www.deldot.gov/Business/subdivisions/index.shtml.
Response: Comment acknowledged; site entrance will be designed in accordance with current
DelDOT requirements. Supporting design calculations will be provided as part of the
plan review package.
Comment 13: In accordance with Section 5.4 of the Manual, sight distance triangles are required and
shall be established in accordance with American Association of State Highway and
Transportation Officials (AASHTO) standards. A spreadsheet has been developed to
assist with this task. It can be found at
http://www.deldot.gov/Business/subdivisions/index.shtml.
Response: Comment acknowledged; plans will be developed and submitted for DelDOT review in
accordance with current DelDOT requirements. Supporting design calculations will be
provided as part of the plan review package.
Comment 14: In accordance with Section 5.14 of the Manual, all existing utilities must be shown on the
plan and a utility relocation plan will be required for any utilities that need to be
relocated.
Response: Comment acknowledged; plans will be developed and submitted for DelDOT review in
accordance with current DelDOT requirements.
Department of Natural Resources and Environmental Control – Beth Krumrine 302-735-3480
Concerns Identified Within the Development Footprint
Wetlands and Subaqueous Lands
Maps from the Statewide Wetlands Mapping Project indicate the potential presence of non- tidal wetlands
on the site. The application indicates that wetlands have been delineated. The U.S. Army Corps of
Engineers sign-off is completed. The application does not propose direct impacts to the wetlands. The
forested wetlands on this property could support an array of plants and animals, most notably wetland
dependent species such as amphibians.
110
Página 111
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 4 of 17
Comment 15: If the site design changes and dredge or fill of wetlands or subaqueous lands becomes
necessary, permitting and/or authorization requirements may apply.
Response: Comment acknowledged.
Vegetated Buffer Zones
Site plans show a 30-foot vegetated buffer along non-tidal wetlands. Vegetated buffer zones placed
adjacent to waterways and wetlands help improve water quality by reducing sediment and pollutants
loads. They also provide valuable habitat and can help prevent encroachment of human activities into
ecologically sensitive areas. Vegetated buffers are not equivalent to setbacks, as residential lots,
walkways, and stormwater management facilities should not be contained within the vegetated buffer
zone.
Comment 16: The applicant must comply with minimum vegetated buffer widths as identified within
county and municipal codes.
Response: Comment acknowledged; vegetated buffers will be provided in accordance with
requirements of the City of Dover Code.
Special Flood Hazard Area
According to the newest Flood Insurance Rate Maps (FIRM), the northern portion of this parcel is
situated within a Special Flood Hazard Area, specifically within the mapped 100-year floodplain (1%
annual chance of flooding). The Special Flood Hazard Area identified on the site lies within zone A. In
lands contained within the 100-year floodplain, the National Flood Insurance Program's floodplain
management regulations must be enforced through the local floodplain ordinance, which can have higher
standards. There are no structures or features proposed within the floodplain.
Comment 17: The applicant must comply with the local floodplain ordinance and regulations applicable
to development or construction within the 100-year floodplain. In determining the
boundary of the floodplain, use the most recent FIRM maps available, which can be
found at https://floodplanning.dnrec.delaware.gov/
Response: Comment acknowledged.
Stormwater Management
The project proposes greater than 5,000 square feet of land disturbing activities and will be subject to
Delaware’s Sediment and Stormwater Regulations.
Comment 18: A Sediment and Stormwater Plan must be developed, then approved by the appropriate
plan review agency prior to any land disturbing activity taking place on the site. For this
project, the plan review agency is the Kent Conservation District.
Response: Comment acknowledged; Sediment and Stormwater Management Plans will be developed
in accordance with the requirements of Kent Conservation District (KCD) and the
Delaware Sediment and Stormwater Regulations (DSSR).
Comment 19: Additionally, to address federal requirements, construction activities that exceed 1.0 acre
of land disturbance require Construction General Permit coverage through submittal of an
electronic Notice of Intent for Stormwater Discharges Associated with Construction
Activity. This form must be submitted electronically
(https://apps.dnrec.delaware.gov/enoi/, select Construction Stormwater General Permit)
to the DNREC Division of Watershed Stewardship, along with the $195 fee.
Response: Comment acknowledged; NOI will be submitted as part of the plan approval process with
KCD.
111
Página 112
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 5 of 17
Comment 20: Schedule a project application meeting with the appropriate plan review agency prior to
moving forward with the stormwater and site design. As part of this process, you must
submit a Stormwater Assessment Study.
Response: Comment acknowledged; pre-application meeting will be coordinated with KCD prior to
formal submittal of plans and reports for review associated with the proposed land
disturbance activities.
Hydrologic Soils Group
Hydrologic Soil Group soils (poorly drained) have been identified in the site. These soil types are
typically not conducive to utilizing infiltration stormwater Best Management Practices such as
bioretention and infiltration basins, which must meet minimum infiltration requirements.
Comment 21: Any stormwater Best Management Practices that propose the use of infiltration or natural
recharge shall include a soils investigation.
Response: Comment acknowledged; a soils investigation will be done to identify locations where
this stormwater practice is practical and a report will be provided to KCD as part of the
design package for their review.
Excellent Groundwater Recharge Area
An Excellent Groundwater Recharge Area is located on the central portion of the site. These areas have
soils that are conducive to water infiltrating downward from surface water into groundwater. Preservation
of these areas is important for replenishing groundwater supplies and ensuring drinking water for future
generations.
Comment 22: The applicant must comply with all county and municipal requirements for construction
and uses in Excellent Groundwater Recharge Areas.
Response: Comment acknowledged; proposed construction activities within the Excellent
Groundwater Recharge Area will be designed in accordance with requirements of the
City of Dover Code.
Wildlife Displacement
Development of this site is anticipated to displace local wildlife. Delaware is home to a rich array of
wildlife species, which greatly depend on forests and other habitat types for food, water and cover.
Comment 23: Future residents are not permitted to discharge firearms within 100 yards (300 feet) of
any occupied dwelling or building to hunt or remove nuisance wildlife.
Response: Comment acknowledged.
Nutrient Management Plan
This project proposes open space of 26 acres.
Comment 24: A nutrient management plan is required for all persons or entities who apply nutrients to
lands or areas of open space of 10 acres or more.
Response: Comment acknowledged.
Delaware Emergency Management Agency (DEMA) – Contact Phillip Cane 302-659-2325
Comment 25: The majority of this parcel is located within an area of Minimal Flood Concern of 1,000
years or greater. However, the northwestern part of the property appears to be in a
Special Flood Hazard Area (SFHA) Flood Zone A, which is a 1% or 100-year flood
112
Página 113
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 6 of 17
plain. The properties themselves do not appear to actually be within a floodplain. No
official requirements here from DEMA.
Response: Comment acknowledged.
Comment 26: The parcel is not yet located within the 10-mile EPZ for the Salem Nuclear Power Plant.
However, the sections to the southeast of W. Denneys Road are located within Kent
Evacuation Zone D.
Response: Comment acknowledged.
Comment 27: The parcel is not located within the 10-mile EPZ for the Salem Nuclear Power Plant.
Response: Comment acknowledged.
State Historic Preservation Office (SHPO) – Contact Carlton Hall 302-736-7400
Comment 28: There are no known archaeological sites or known historic or eligible properties in the
project area.
Response: Comment acknowledged.
Comment 29: Wetland permitting may be required for northern portion of the parcel – in which case,
this project should be properly initiated through Section 106 Regulations.
Response: Comment acknowledged.
Comment 30: Probability for precontact archaeological resources is high.
Response: Comment acknowledged.
Comment 31: Portions of the area have been archaeologically surveyed. The survey uncovered many
archaeological sites and materials in analogous areas.
Response: Comment acknowledged.
Comment 32: An archaeological survey is recommended.
Response: Comment acknowledged; recommendation for archaeological consultant will be noted
for developer’s consideration.
Delaware State Fire Marshall’s Office – Contact Duane Fox 302-259-7037
Comment 33: At the time of formal submittal, the applicant shall provide; completed application, fee,
and three sets of plans depicting the following in accordance with the Delaware State Fire
Prevention Regulation (DSFPR).
Response: Comment acknowledged; plans will be developed and submitted in accordance with the
requirements of the Delaware State Fire Prevention Regulation (DSFPR) and the
applicable application for plan review.
Fire Protection Water Requirements:
Comment 34: Water distribution system capable of delivering at least 1,000 gpm for 1-hour duration, at
20-psi residual pressure is required. Fire hydrants with 800 feet spacing on centers.
Response: Comment acknowledged; if necessary, flow tests will be performed to confirm available
flow and pressure requirements of the DSFPR. Hydrants will be provided for on-site
113
Página 114
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 7 of 17
areas in accordance with spacing requirements consistent with the proposed residential
unit type(s) proposed by this project.
Comment 35: Where a water distribution system is proposed for mixed occupancy use sites, the
infrastructure for fire protection water shall be provided, including the size of water
mains for fire hydrants and sprinkler systems.
Response: Comment acknowledged; this information will be provided as part of the construction
plans.
Fire Protection Features:
Comment 36: All structures over 10,000 Sq. Ft. aggregate will require automatic sprinkler
protection installed.
Response: Comment acknowledged; sprinkler systems are proposed for all apartment buildings.
Comment 37: Buildings occupied as apartments (multi-family living units comprising of 3 or more
units) will require automatic sprinkler protection installed.
Response: Comment acknowledged; sprinkler systems are proposed for all apartment buildings.
Comment 38: Buildings greater than 10,000 sq ft, 3-stories or more, over 35 feet, or classified as High
Hazard, are required to meet fire lane marking requirements. Show Fire Department
Connection location (Must be within 300 feet of fire hydrant), and detail as shown in the
DSFPR.
Response: Comment acknowledged; all apartment buildings will meet the DSFPR requirements.
Fire lanes and required markings will be included in the final Site Plan.
Comment 39: Show Fire Lanes and Sign Detail as shown in DSFPR.
Response: Comment acknowledged; fire lanes and required markings will be included in the final
Site Plan.
Comment 40: Standpipe systems may be required per DSFPR.
Response: Comment acknowledged.
Accessibility:
Comment 41: All premises, which the fire department may be called upon to protect in case of
fire, and which are not readily accessible from public roads, shall be provided
with suitable gates and access roads, and fire lanes so that all buildings on the
premises are accessible to fire apparatus. This means that the access road must be
constructed so fire department apparatus may negotiate it.
Response: Comment acknowledged; all buildings will have adequate access. All internal roads will
be in designed in accordance with City of Dover standards and will accommodate fire
apparatus.
Comment 42: Any dead-end road more than 300 feet in length shall be provided with a turn-around or
cul-de-sac arranged such that fire apparatus will be able to turn around by making not
more than one backing maneuver. The minimum paved radius of the cul-de-sac shall be
38 feet. The dimensions of the cul-de-sac or turn-around shall be shown on the final
plans. Also, please be advised that parking is prohibited in the cul-de-sac or turn around.
Response: Comment acknowledged; no dead-end roads are proposed for this project.
Comment 43: The use of speed bumps or other methods of traffic speed reduction must be in
accordance with Department of Transportation requirements.
114
Página 115
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 8 of 17
Response: Comment acknowledged.
Comment 44: The local Fire Chief, prior to any submission to our Agency, shall approve in writing the
use of gates that limit fire department access into and out of the development or property.
Response: Comment acknowledged; no gates limiting access to the development are anticipated to
be installed as part of this project.
Gas Piping and System Information:
Comment 45: Provide type of fuel proposed and show locations of bulk containers on plan.
Response: Comment acknowledged; while no bulk containers are anticipated for this project, plans
will be developed in accordance requirements of the DSFPR and will include this
information.
Required Notes:
Comment 46: Provide a note on the final plans submitted for review to read " All fire lanes, fire
hydrants, and fire department connections shall be marked in accordance with the
Delaware State Fire Prevention Regulations"
Proposed Use
Alpha or Numerical Labels for each building/unit for sites with multiple buildings/units.
Square footage of each structure (Total of all Floors)
National Fire Protection Association (NFPA) Construction Type
Maximum Height of Buildings (including number of stories)
Note indicating if building(s) is/are to be sprinklered
Name of Water Provider
Letter from Water Provider approving the system layout
Provide Lock Box Note (as detailed in DSFPR) if Building is to be sprinklered
Provide Road Names, even for County Roads
Response: Comment acknowledged; plans will be developed in accordance requirements of the
DSFPR and include the applicable notes and information as detail in the plan
application checklist.
Recommendations/Additional Information
This section includes a list of site-specific suggestions that are intended to enhance the project. These
suggestions have been generated by the State Agencies based on their expertise and subject area
knowledge. These suggestions do not represent State code requirements. They are offered here in
order to provide proactive ideas to help the applicant enhance the site design, and it is hoped (but in no
way required) that the applicant will open a dialogue with the relevant agencies to discuss how the
suggestions can benefit the project.
Department of Transportation – Contact Stephen Bayer 302-760-2109
Recommendation 1: The applicant should expect a requirement that all PLUS and Technical Advisory
Committee (TAC) comments be addressed prior to submitting plans for review.
Response: Comment acknowledged; plans will be submitted to DelDOT with revisions to
address TAC and PLUS comments as noted above.
Recommendation 2: Please be advised that the Standard General Notes have been updated and posted to
the DelDOT website. Please begin using the new versions and look for the revision
115
Página 116
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 9 of 17
dates of March 21, 2019 and March 16, 2021. The notes can be found at
https://www.deldot.gov/Business/subdivisions/.
Response: Comment acknowledged; plans to be submitted to DelDOT will reference latest
General Notes for Record Plans, Entrance Plans, and Maintenance of Traffic
Plans.
Department of Natural Resources and Environmental Control (DNREC) – Contact Beth Krumrine
302-735-3480
Concerns Identified Within the Development Footprint
Wetlands and Subaqueous Lands
Recommendation 3: As proposed for this project, do not disturb wetland areas. Wetlands are a
critical part of our natural environment. They reduce the impacts of flooding,
absorb pollutants, and improve water quality. Wetlands provide habitat for
animals and plants and many contain a wide diversity of life, supporting plants
and animals that are found nowhere else.
Response: Comment acknowledged; the project will be designed to minimize impacts to
wetlands and will comply with State and Federal regulations.
Recommendation 4: Maintain input to natural wetlands at the pre-construction level. Avoid causing
an increase or decrease in the naturally occurring water level.
Response: Comment acknowledged.
Recommendation 5: Avoid diverting surface water from roadways and stormwater facilities into the
wetlands on site. Water quality could be detrimentally affected by run-off,
which can contain oil and other pollutants.
Response: Comment acknowledged.
Recommendation 6: Avoid installing sewers with grates, which can create a hazard for amphibians
and reptiles.
Response: Comment acknowledged.
Recommendation 7: Design the development to exclude curbs. If road curbing is part of the design,
curbing that allows small animals, such as turtles and salamanders, to climb out
of the roadbed (such as Type 2 or Cape Cod curbing) is preferred over steep,
vertical curbing.
Response: Comment acknowledged.
Recommendation 8: Use open bottom box culverts to allow for natural substrate to remain and in-
water passage of aquatic life. Additionally, culverts should be left as wide as
possible to ensure that salamanders can travel through them.
Response: Comment acknowledged.
Vegetated Buffer Zones
Recommendation 9: Expand the 30-foot buffer to no less than 100 feet from the edge of wetlands
and all waterways to protect water quality and to provide an additional margin
of safety for flooding.
Response: Comment acknowledged; buffer areas to natural resources will be provided in
accordance with the requirements of the City of Dover Code. Strategies will be
116
Página 117
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 10 of 17
developed in concert with KCD to provide protection to wetland areas during
construction to reduce sediment discharge to these areas.
Recommendation 10: Vegetated buffer zones should be left undisturbed during construction and
should be identified outside of the Limit of Disturbance on the engineering
plans. In some instances, stormwater outfalls, conveyances, and emergency
spillways may cross through these zones, and will require temporary
disturbance during construction.
Response: Comment acknowledged; buffer areas will be designed in accordance with the
requirements of the City of Dover Code.
Recommendation 11: Vegetated buffer zones should be deeded as community open space. Signage
should be installed at the edge and within the buffer zones to deter residents
from encroaching into these common areas.
Response: Comment acknowledged; buffer areas will be primarily located within community
open space areas.
Recommendation 12: Maintain vegetated buffer zones as either grasslands/meadows or forest. Buffer
zones should be planted exclusively with native trees and plants. Native plants
are well-suited to our climate and require limited maintenance. They also
provide an increasingly important role in the survival of native birds and
beneficial insects whose habitat is shrinking due to development and climate
change.
Response: Comment acknowledged; riparian buffer areas will be planted and maintained in
accordance with requirements of the City of Dover Code.
Recommendation 13: Grass cutting for vegetated buffer zones if maintained as meadow should not
occur between April 1st to July 31st to reduce impacts to nesting birds and
other wildlife species that utilize meadows and grasslands for breeding habitat.
Response: Comment acknowledged.
Delaware Ecological Network
Recommendation 14: Most of the project site lies within lands designated within the Delaware
Ecological Network, a statewide network of interconnected lands of significant
ecological value. This GIS data layer is based on principles of landscape
ecology and conservation biology, providing a consistent framework to identify
and prioritize areas for natural resource protection. Forest disturbances on this
site will jeopardize habitat on the parcel and likely beyond the parcel’s
boundary.
Removing forested areas within the Delaware Ecological Network should be
avoided to the greatest extent possible. These areas provide wildlife habitat,
uptake nutrients, infiltrate stormwater, and improve water quality. Forests also
provide shading and cooling, while also reducing carbon that contributes to
climate change.
Response: Comment acknowledged.
Removal of Mature Forest
Recommendation 15: The preliminary plan proposes the elimination of approximately 18 of 37 acres
of forest on the site. An analysis of historical data indicates that much of the
forest area located on the site has likely maintained some degree of forest cover
117
Página 118
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 11 of 17
since 1937 and could be considered mature forest. Mature forests possess the
potential for rare, threatened, or endangered species that rely on this type of
habitat.
Removing forested areas for development, especially mature forests, should be
avoided to the greatest extent possible. Forests filter water for improved water
quality, provide habitat for wildlife, absorb nutrients, infiltrate stormwater,
moderate temperatures, and store atmospheric carbon which would otherwise
contribute to climate change.
Response: Comment acknowledged; forest area removal will be minimized as much as
practical for the development and will comply with the City of Dover Code.
Recommendation 16: A forest assessment should be conducted to determine if mature forest
resources exist on the property and to delineate their boundaries. Additionally,
a forest assessment would include the identification of specimen trees and
forest-dependent wildlife. If mature forests are found, these areas should be
conserved to the maximum extent practicable.
Response: Comment acknowledged.
Recommendation 17: To reduce impacts to nesting birds and other wildlife species that utilize forests
for breeding, it is recommended that tree clearing not occur from April 1st to
July 31st. Likewise, avoid mowing open space areas and grass filter strips
during the same timeframe, as various species of birds utilize these areas for
nesting sites.
Response: Comment acknowledged.
Special Flood Hazard Area
Recommendation 18: As proposed, locate all structures outside of the floodplain. If this is not
possible, the developer should consider designing structures to a higher
standard to avoid potential future flood damage and loss.
Response: Comment acknowledged; no structures are proposed within the floodplain.
Key Wildlife Habitat
Recommendation 19: The non-tidal coastal plain stream directly adjacent to the property, is mapped
as Key Wildlife Habitat in the Delaware Wildlife Action Plan.
Key Wildlife Habitat should be conserved to the maximum extent practicable
and negative impacts should be minimized.
Response: Comment acknowledged; no impacts are expected to this stream as part of this
project.
Recommendation 20: In the interest of water quality and wildlife habitat, we recommend maintaining
an upland buffer of at least 100 ft along rivers, streams and wetlands. This
buffer should not be a maintained lawn area and should not contain lot lines or
infrastructure. We recommend the buffer area be comprised of the existing
vegetation or planted with Delaware native species of trees, shrubs, grasses or
wildflowers.
Response: Comment acknowledged.
Recommendation 21: Appropriate erosion and sediment control measures should be taken during
construction activities to minimize potential impacts to the stream system. For
118
Página 119
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 12 of 17
erosion control, we recommend (if feasible) using materials that are
biodegradable and that do not include plastic netting or have welded-joint poly-
based matting. Wildlife entanglement in rolled erosion control products
(RECP), especially those that contain plastic netting, is well documented.
Response: Comment acknowledged.
Stormwater Management
Recommendation 22: Where the site and soil conditions allow, integrate runoff reduction techniques
including infiltration basins, bioretention (rain gardens), filter strips, and pavers
to encourage on- site stormwater infiltration and reduce runoff.
Response: Comment acknowledged; stormwater management facilities will be designed in
accordance the requirements of the DSSR, and the Kent Conservation District.
Recommendation 23: For improved stormwater management, preserve existing trees, wetlands, and
passive open space.
Response: Comment acknowledged.
Drainage
Recommendation 24: All existing drainage ditches on the property should be evaluated for function
and cleaned, if needed, prior to the construction of the project.
Response: Comment acknowledged.
Recommendation 25: Environmental permits or exemptions may be required by the County Conservation
District (Standard Plan), the DNREC Sediment and Stormwater Program
(eNOI/NOT), Army Corp of Engineers, and/or DNREC Wetlands and Subaqueous
Lands Section prior to clearing and/or excavating ditch channels.
Response: Comment acknowledged; these agencies will be consulted through the design of the
project when necessary.
Recommendation 26: All precautions should be taken to ensure the project does not hinder any off-
site drainage upstream of the project or create any off-site drainage problems
downstream by the release of on-site storm water.
Response: Comment acknowledged; no modifications to the existing natural drainageways
are proposed by this project. On-site grading will maintain the current drainage
patterns of the neighboring properties. Stormwater management will be provided
on site and will be designed in accordance with the current DSSR to reduce the
potential for impacts to downstream properties due to discharge of stormwater
runoff.
Water Quality (Pollution Control Strategies)
Recommendation 27: This site lies within the Saint Jones River Watershed. Surface water quality in
this watershed does not meet Federal and/or State Water Quality Standards and
a Pollution Control Strategy is in place for this watershed.
Implement vegetated buffers with a width of at least 100 feet around all water
features on or adjacent to the site.
Response: Comment acknowledged; buffer areas will be planted and maintained in
accordance with requirements of the City of Dover Code.
Recommendation 28: Reduce impervious surfaces on the project site by eliminating areas of
119
Página 120
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 13 of 17
impervious pavement and/or using pervious pavement where practicable.
Response: Comment acknowledged.
Recommendation 29: Reduce stormwater runoff by integrating infiltration basins, bioretention (rain
gardens), filter strips, and by preserving existing trees, wetlands, and passive open
space.
Response: Comment acknowledged; stormwater management will be provided on site and will
be designed in accordance with the current DSSR and these practices will be
considered during the design.
Recommendation 30: Reduce the necessity for nutrient application by maintaining open space as
meadow or forest planted exclusively with native plants. Native plants are well-
suited to our climate and require limited maintenance.
Response: Comment acknowledged; open space plantings will be provided in accordance with
the requirements of the City of Dover Code.
Excellent Groundwater Recharge Area
Recommendation 31: For Excellent Groundwater Recharge Areas, limit impervious surfaces to no
more than 20% of the entire area designated as having excellent recharge.
Response: Comment acknowledged; the project will be designed in accordance with the
requirements of the City of Dover Code.
Wildlife Displacement
Recommendation 32: Removing forested areas for development, especially mature forests, should be
avoided to the greatest extent possible. Forests are a key habitat type for
wildlife in Delaware.
Response: Comment acknowledged.
Recommendation 33: Deer, groundhogs, and rabbits will browse on gardens and ornamental
landscaping. Reduce the potential for future conflicts between future residents
and wildlife by maintaining large blocks of forest, as opposed to small pockets
of wooded areas.
Response: Comment acknowledged.
Mosquitoes
Recommendation 34: The project is expected to be impacted by mosquitoes due to its location near
large expanses of wetlands. Mosquito control issues are increasing as
developments infringe on wetland areas, often leading to increased demands
for mosquito control services beyond what DNREC has the resources to
provide.
If necessary, arrange for long-term mosquito control services through a private
company licensed in this area of specialty. In some cases, the DNREC
Mosquito Control Section may be able to provide these services free of charge.
Response: Comment acknowledged; it is anticipated that the SWM facilities will be designed
to provide deep pool areas to accommodate the establishment of native fish to
provide level of natural mosquito control within the SWM area. Information
regarding Mosquito Control services will be provided to the developer and HOA
for their consideration.
120
Página 121
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 14 of 17
Nature Preserves
Recommendation 35: The proposed development is located near the Fork Branch Nature Preserve.
While across the street, there should be an effort made by the developer to
ensure encroachment into the Preserve does not occur. There shall be no
staging of equipment on Park property.
Response: Comment acknowledged; no disturbance or staging of equipment on Park property
is expected for this project.
Recommendation 36: While not currently registered as Natural Area, the property’s proximity to
Fork Branch Nature Preserve suggests that it may share some or all ecological,
historical, cultural, or geologic value as the land within the Nature Preserve.
Consider minimizing the development footprint and dedicating forested and
wetland areas as a Nature Preserve through a conservation easement or
donation of land. For more information, please contact the DNREC Planning
Preservation and Development Section.
Response: Comment acknowledged; this information will be provided to the developer.
Additional Sustainable Practices
Recommendation 37: Install electric vehicle (EV) charging stations for your residents. Residents will
increasingly expect options for EV charging. Installation costs can vary
significantly depending on the parking and electricity distribution at a given
location, so it is often easier and cheaper to plan for the installation at
construction, rather than doing costly retrofits later. The DNREC Division of
Climate, Coastal and Energy offers rebates of up to 90% of the cost of the
charging station for commercial, multi-unit dwelling and other public
properties. These programs address climate change goals of reducing
greenhouse gas emissions and improving overall air quality
(https://dnrec.alpha.delaware.gov/climate-coastal-energy/clean-transportation/).
Response: Comment acknowledged; EV charging stations are proposed for this project and
this information will be shared with the developer for their consideration. Further
details will be provided as part of the Site Plan.
Recommendation 38: Use renewable energy infrastructure such as solar or geothermal to reduce
energy costs and further reduce pollution created from offsite generation. Grant
funds and incentives are available for Delmarva Power customers through the
DNREC Green Energy Fund, which includes several funding types through the
state’s major electric utilities (https://dnrec.alpha.delaware.gov/climate-coastal-
energy/renewable/assistance/).
Response: Comment acknowledged; information will be shared with the developer for their
consideration.
Recommendation 39: Include space for recycling dumpsters within the preliminary site design stage.
These can be placed adjacent to trash dumpsters.
Response: Comment acknowledged; information will be shared with the developer for their
consideration.
Recommendation 40: Incorporate nonmotorized connectivity and install bicycle racks where feasible
to help facilitate non-vehicular travel modes.
121
Página 122
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 15 of 17
Response: Comment acknowledged; connectivity and bicycle racks are proposed for this
project. Further details will be provided as part of the Site Plan.
Recommendation 41: Use efficient Energy Star rated products and materials in construction and
redevelopment. Energy efficient appliances use less energy over time. This
saves consumers and businesses money, while also helping to reduce pollution
from power generation.
Response: Comment acknowledged; information will be shared with the developer for their
consideration.
Recommendation 42: Use structural paint coatings that are low in Volatile Organic Compounds to
help protect air quality. Air pollution from new construction is generated
through the use of maintenance equipment, paints, and consumer products like
roof coatings and primers.
Response: Comment acknowledged; information will be shared with the developer for their
consideration.
Recommendation 43: Use recycled materials, such as reclaimed asphalt pavement, to reduce heat
island effects on paved surfaces, prevent landfill waste, and lower material
costs.
Response: Comment acknowledged; information will be shared with the developer for their
consideration.
Delaware State Emergency Management Agency (DEMA) - Contact Philip Cane 302-659-2325
Recommendation 44: The county has a population density of 310.20 per square mile based on the US
2020 Census report; an increase from 2010 at 271.30 persons per square mile.
The specific census block(s) the project is located on has a total population of
77, though, with development, this will undoubtedly change.
The adjacent blocks aggregate bring the area to a total population of 710.
Response: Comment acknowledged.
Recommendation 45: The FEMA National Risk Index is an online mapping application that identifies
communities most at risk to 18 natural hazards: Avalanche, Coastal Flooding,
Cold Wave, Drought, Earthquake, Hail, Heat Wave, Hurricane, Ice Storm,
Landslide, Lightning, Riverine Flooding, Strong Wind, Tornado, Tsunami,
Volcanic Activity, Wildfire, and Winter Weather. The FEMA National Risk
Index is calculated by multiplying the Expected Annual Loss times the Social
Vulnerability and dividing that by the Community Resilience. According to
FEMA’s National Risk Index, the parcel is considered relatively low for
overall natural hazards risks.
Response: Comment acknowledged.
Recommendation 46: Community Resilience is a consequence reduction risk component and a
community risk factor that represents the ability of a community to prepare for
anticipated natural hazards, adapt to changing conditions and withstand/recover
rapidly from disruptions. Social Vulnerability is a consequence-enhancing risk
factor that represents the susceptibility of social groups to the adverse impacts
of natural hazards. Its community resilience and social vulnerability are rated
as relatively high.
122
Página 123
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 16 of 17
Response: Comment acknowledged.
Recommendation 47: Regarding energy use and consumption, the parcel utilizes natural gas as the
predominant fuel type for heating purposes with electric heat a close second.
DEMA strongly encourages the use of renewable energies and high-efficiency
appliances and utilities. Regarding utilities, DEMA suggests incorporating 90%
series furnaces/HVAC systems; the closer to 99%, the better, as well as A/C
units of 20 Seer or greater. DEMA recommends using tankless water heaters,
and battery backup systems for sump pumps to reduce potential water damage
from power failure.
Response: Comment acknowledged; information will be shared with the developer for their
consideration.
Recommendation 48: Lastly, DEMA encourages the integration of modern and emerging
technologies, such as the potential for electric vehicles in garages/parking lots,
green roofs where applicable and allowable, and the like.
Response: Comment acknowledged.
Delaware State Housing Authority (DSHA) - Contact Karen Horton 302-739-4263
Recommendation 49: DSHA supports the proposal for 312 rental units on 40 acres of land near West
Denney’s Road in Dover. While this is a market-rate development, it provides
a more affordable option for many residents.
This site is also located within a DSHA-defined “Area of Opportunity” which
are strong, high value markets, with close job proximity and economic
opportunity, high performing schools, amenities and supportive infrastructure
that help households succeed. Unfortunately, these same areas contain little
affordable housing. DSHA recommends that local stakeholders provide
resources to connect these residents to the high-quality services the area has to
offer.
Due to the large scale of this project (40 acres, 312 units), DSHA encourages
that the developer utilizes thoughtful site layout and design measures. This
includes measures that are human-scale and incorporates attractive
streetscapes, community recreation areas, visually appealing façade treatments,
and significant landscaping measures. These elements all serve to create
desirable quality communities where families can thrive.
Response: Comment acknowledged.
Delaware State Marshall's Office - Contact Duane Fox 302-739-4394
Recommendation 50: Although not a requirement of the Delaware State Fire Prevention Regulations,
the Office of the State Fire Marshal encourages home builders to install
residential fire sprinkler systems in all residential dwellings.
Response: Comment acknowledged.
Recommendation 51: The Office of the State Fire Marshal reminds home builders that they are
obligated to comply with requirements of Subchapter III of Chapter 36 of Title
6 of the Delaware Code which can be found at the following website:
http://delcode.delaware.gov/title6/c036/sc03/index.shtml
123
Página 124
Item 4.
Re: Windward Ridge PLUS Review (2023-07-09) Comments Response
September 29, 2023
Page 17 of 17
Response: Comment acknowledged.
Recommendation 52: Preliminary meetings with fire protection specialists are encouraged prior to
formal submittal. Please call for appointment. Applications and brochures can
be downloaded from our website: www.statefiremarshal.delaware.gov,
technical services link, plan review, applications or brochures.
Response: Comment acknowledged; a pre-submittal meeting will be scheduled with the SFMO
prior to plan submittal.
A Preliminary Plan application has been submitted to the City of Dover Department of Planning and
Zoning for review and approval. If you should require additional information regarding this PLUS
application, please contact me at your convenience at 302-326-2200.
Truly Yours,
MORRIS & RITCHIE ASSOCIATES, INC.
Charlie Barnett,
Principal
c.c. Mary Ellen Gray, City of Dover
Doug Motley, JLAM
File (21905)
124
Página 125
Item 4.
SITE DATA:
SITE
MORRIS & RITCHIE
ASSOCIATES, INC.
ENGINEERS, PLANNERS,
SURVEYORS, AND LANDSCAPE
ARCHITECTS
18 BOULDEN CIRCLE
SUITE 36
NEW CASTLE, DE 19720
302-326-2200
302-326-2399 FAX
DEVELOPER
JACK LINGO ASSET MANAGEMENT
246 REHOBOTH AVENUE
REHOBOTH BEACH, DE 19971
(302) 226-6645
LOCATION MAP
WINDWARD RIDGE
NORTH
SITE
KENT COUNTY, DELAWARE
LOCATION MAP
CITY OF DOVER
LEGEND:
GENERAL NOTES:
NW NW
FP FP
© CONTENTS COPYRIGHT 2023
MORRIS & RITCHIE ASSOCIATES, INC.
SHEET INDEX:
OWNER CERTIFICATION (PARCEL OWNER
02.00): CERTIFICATION (PARCEL 03.00):
SHEET TITLE
PRELIMINARY PLAN
TITLE SHEET
SHEET NUMBER
ENGINEER'S CERTIFICATION: OWNER CERTIFICATION (PARCEL 04.00):
1 OF 8
125
Página 126
Item 4.
LEGEND
MORRIS & RITCHIE
ASSOCIATES, INC.
ENGINEERS, PLANNERS,
SURVEYORS, AND LANDSCAPE
ARCHITECTS
NORTH 18 BOULDEN CIRCLE
CURVE TABLE SUITE 36
NEW CASTLE, DE 19720
302-326-2200
CURVE # LENGTH RADIUS DELTA CHORD BEARING CHORD LENGTH 302-326-2399 FAX
DEVELOPER
JACK LINGO ASSET MANAGEMENT
246 REHOBOTH AVENUE
REHOBOTH BEACH, DE 19971
(302) 226-6645
WINDWARD RIDGE
LINE TABLE
LINE # LENGTH DIRECTION
KENT COUNTY, DELAWARE
CITY OF DOVER
© CONTENTS COPYRIGHT 2023
MORRIS & RITCHIE ASSOCIATES, INC.
SITE DATA:
SHEET TITLE
PRELIMINARY PLAN
RECORD PLAN
SHEET NUMBER
2 OF 8
126
Página 127
Item 4.
FP
FP LEGEND
FP FP
FP FP /
SOILS TABLE:
FP
FP FP
FP
/
FP FP
/
FP NW NW
/ FP
/ NW NW MORRIS & RITCHIE
FP /
FP
/ FP
ASSOCIATES, INC.
FP FP FP
FP
/ FP
FP / ENGINEERS, PLANNERS,
/ / / / SURVEYORS, AND LANDSCAPE
FP /
FP
/
FP
FgcA ARCHITECTS
NORTH
FP FP FP /
/
FP / NW
NW
NW 18 BOULDEN CIRCLE
/ SUITE 36
/ FP
/
NEW CASTLE, DE 19720
/ FP FP NW CURVE TABLE 302-326-2200
FP / /
/ / 302-326-2399 FAX
NW NW
FP / NW CURVE # LENGTH RADIUS DELTA CHORD BEARING CHORD LENGTH
/
FP / DEVELOPER
FP /
/
FP
/ Za / /
NW
NW JACK LINGO ASSET MANAGEMENT
246 REHOBOTH AVENUE
FP / REHOBOTH BEACH, DE 19971
/ FP S (302) 226-6645
/FP NW
/
SA
FP NW N
/
FP /
/ FP SA
N
/ Za NW /
/ NW SA
N
LINE TABLE
/ / SA
WINDWARD RIDGE
/ NW NW N
LINE # LENGTH DIRECTION
/ /
/ S
/ /
SA
N
/
/ / SA
FgcA /
/
/
N
/
/ SA
/ N
SA
/ N
/
SA
N
FgcA / S
/
/ /
/
NW
NW NW
/ NW NW /
/ NW
/ /
NW
/ / /
NW /
/
KENT COUNTY, DELAWARE
G
/
G
/ NW / /
/ G
/
G
/ G
/ /
WocA / NW / / / G
/ / W G
/ / / G S
NW
W
G
/ /
W
NW
/ G G
/ /
CITY OF DOVER
/ W
G G
W
/ /
/ G
NW W
/ NW
NW
NW WdcB W G
NW NW /
NW W
/ / G
FgcA W
G W
CoA
/ /
W
/
G
W
/ / /
/ G W
/ /
FgcA / G
W
/ /
/ / W
/
G
HbB / W
/ /
/ /
/ / G
/ W
/
/ / / /
/ /
/ G
W
/ / / /
/ /
/ / /
/ G W
/ /
/
/ / W
G
/ / /
W
/ / / G
/ W
HbB G
/
/
W
/ / © CONTENTS COPYRIGHT 2023
/
/ MORRIS & RITCHIE ASSOCIATES, INC.
WdcB G
W
/ /
/
/ G W
/ / / / G W
/
/
/ HbB G
W
/
W
/ / /
G /
/ W
/
/ G W
SHEET TITLE
/ W
/ G
/ / W
PRELIMINARY PLAN
EXISTING CONDITION
/
W
/ /
W
/
/
W
/ SHEET NUMBER
/
W
/ /
W
/ /
/
/
W
W
3 OF 8
/ /
127
Página 128
Item 4.
LEGEND
RT
HNO MORRIS & RITCHIE
NW NW ASSOCIATES, INC.
NW NW
ENGINEERS, PLANNERS,
FP FP SURVEYORS, AND LANDSCAPE
ARCHITECTS
18 BOULDEN CIRCLE
SUITE 36
NEW CASTLE, DE 19720
302-326-2200
302-326-2399 FAX
DEVELOPER
JACK LINGO ASSET MANAGEMENT
246 REHOBOTH AVENUE
REHOBOTH BEACH, DE 19971
(302) 226-6645
WINDWARD RIDGE
KENT COUNTY, DELAWARE
CITY OF DOVER
© CONTENTS COPYRIGHT 2023
MORRIS & RITCHIE ASSOCIATES, INC.
A A A A A A A A A CZ CZ
A A CZ CZ
A A A CZ
A
A CZ
CZ CZ A CZ
CZ CZ
CZ CZ A
CZ CZ
A
A
A SHEET TITLE
A
A
A
A PRELIMINARY PLAN
A
A
SITE PLAN
A
A
SHEET NUMBER
4 OF 8
128
Página 129
Item 4.
FP
FP
FP
LEGEND FP
FP FP
FP
FP
FP
FP
FP NO
NW NW
H RT MORRIS & RITCHIE
FP
NW NW
FP ASSOCIATES, INC.
FP FP
FP ENGINEERS, PLANNERS,
FP SURVEYORS, AND LANDSCAPE
ARCHITECTS
FP
FP 18 BOULDEN CIRCLE
SUITE 36
NEW CASTLE, DE 19720
FP
302-326-2200
302-326-2399 FAX
FP
FP
DEVELOPER
FP
JACK LINGO ASSET MANAGEMENT
246 REHOBOTH AVENUE
REHOBOTH BEACH, DE 19971
(302) 226-6645
FP FP
FP
NW FP
FP
NW
FP
WINDWARD RIDGE
NW
FP
NW
FP
FP FP
FP
NW FP
NW
FP
FP FP
NW FP
FP NW
FP FP
NW FP
FP NW
NW FP
NW
NW
FP
NW
NW
FP
KENT COUNTY, DELAWARE
NW
FP
NW NW
NW
NW
NW
NW
NW
NW
NW
CITY OF DOVER
NW
NW
NW
NW
NW NW
NW
NW NW
NW //
NW
NW
//
// NW
NW
//
NW // NW
NW
NW
// // NW
NW NW
NW
NW
NW
// //
NW
NW
// //
NW
// NW
//
NW
//
NW
//
//
© CONTENTS COPYRIGHT 2023
MORRIS & RITCHIE ASSOCIATES, INC.
SHEET TITLE
PRELIMINARY PLAN
SITE PLAN
SHEET NUMBER
5 OF 8
129
Página 130
Item 4.
LEGEND
W
W
W
W
W
W W
W
W W W W
RT
HNO NW NW MORRIS & RITCHIE
W
W
NW NW
ASSOCIATES, INC.
W
W
FP FP
ENGINEERS, PLANNERS,
SURVEYORS, AND LANDSCAPE
W ARCHITECTS
W
W
W W W
W W 18 BOULDEN CIRCLE
W
W SUITE 36
W W W
NEW CASTLE, DE 19720
W 302-326-2200
W
302-326-2399 FAX
W
W W W
DEVELOPER
W JACK LINGO ASSET MANAGEMENT
246 REHOBOTH AVENUE
W REHOBOTH BEACH, DE 19971
W
(302) 226-6645
W
W W
W W
W
W
W
W
W W
W
WINDWARD RIDGE
W
W
W
W
W
W
W W
W
W W
W W
W
W
W
W
W
W
W
W
KENT COUNTY, DELAWARE
W
W
W
W
W
W
W
W
W
CITY OF DOVER
W
W
W
W
W
W
W
W
W W
W W
W
W
W W
W
W
W W
W W
W W
W
W
W W W
W W
W W
W
W
W
W
W W W
W
W
W
W
W
W
W
W
W
W
W
© CONTENTS COPYRIGHT 2023
W W MORRIS & RITCHIE ASSOCIATES, INC.
W
W
W
W
W
W
W
W
W W
W
W
W W
W
W W W
W
W
W
W SHEET TITLE
W W W
W W
W W W
W W W
W W
W
W
W W W W
W
W
W W
W
PRELIMINARY PLAN
W W W W
W W
W
UTILITY PLAN
W S
W
SHEET NUMBER
W
W
W
W
6 OF 8
130
Página 131
Item 4.
FP
FP
FP
FP
LEGEND FP FP
FP
FP
FP
FP
FP NO
H RT MORRIS & RITCHIE
W FP
NW NW W FP ASSOCIATES, INC.
NW NW
W FP ENGINEERS, PLANNERS,
FP SURVEYORS, AND LANDSCAPE
FP FP
ARCHITECTS
W
FP
W W W FP 18 BOULDEN CIRCLE
W SUITE 36
W W NEW CASTLE, DE 19720
FP
W 302-326-2200
W 302-326-2399 FAX
W FP
FM FM
W
FP
W
DEVELOPER
W
FP
JACK LINGO ASSET MANAGEMENT
W 246 REHOBOTH AVENUE
REHOBOTH BEACH, DE 19971
W (302) 226-6645
W FP FP
W
W FP
NW W FP
W
W FP
NW W
FP
WINDWARD RIDGE
NW W
W
W FP
NW
W FP
FP FP
W FP
NW FP
NW
W
FP
W FP FP
NW W FP
W
FP NW
FP FP
NW W
FP
W FP NW
NW W FP
W NW
W NW
FP
NW
NW W FP
KENT COUNTY, DELAWARE
W NW
W FP
W W
NW NW W
W NW
W
NW W
FM
NW W NW
NW FM
NW W NW
CITY OF DOVER
NW
NW
FM NW
NW W
NW NW
W FM
NW
NW NW
W FM
NW //
NW
NW
//
//
W NW
FM
NW
// W
NW // NW
W
NW
NW FM
// //
W NW
NW NW W
W W NW
NW FM
NW
// // W NW
W
NW
// // FM
W
W NW
// NW
//
W FM
W NW
//
NW
// FM
W
FM
// W
W FM
W
W FM
W
W FM
W
W FM
© CONTENTS COPYRIGHT 2023
W W MORRIS & RITCHIE ASSOCIATES, INC.
W W FM
W
W
W
FM
W
W
W W
W W FM
W
W
W
W SHEET TITLE
W FM
W W
W
PRELIMINARY PLAN
W
W
UTILITY PLAN
W
W W
W SHEET NUMBER
W
W
W
W
W
W
W
7 OF 8
W
W
W W W W
131
Página 132
Item 4.
FP
FP FP
FP SITE NOTES:
FP FP
FP
FP FP
FP
FP FP
FP
FP
MORRIS & RITCHIE
FP FP
FP
ASSOCIATES, INC.
FP
FP
FP
FP ENGINEERS, PLANNERS,
SURVEYORS, AND LANDSCAPE
FP
ARCHITECTS
FP
FP
NORTH
FP FP FP
FP NW
NW
NW 18 BOULDEN CIRCLE
SUITE 36
FP NEW CASTLE, DE 19720
FP FP NW 302-326-2200
FP
302-326-2399 FAX
NW NW NW
FP
FP
FP
NOTES: DEVELOPER
FP
NW JACK LINGO ASSET MANAGEMENT
NW 246 REHOBOTH AVENUE
FP
REHOBOTH BEACH, DE 19971
FP (302) 226-6645
FP NW
FP NW
FP
FP
NW
NW
WINDWARD RIDGE
NW NW
NW
NW NW
NW NW
NW
NW NW
KENT COUNTY, DELAWARE
// //
//
NW
//
NW
//
NW //
//
NW
CITY OF DOVER
//
// //
NW
NW NW
NW
NW NW
NW
LEGEND
© CONTENTS COPYRIGHT 2023
MORRIS & RITCHIE ASSOCIATES, INC.
NW NW
NW NW
FP FP
SHEET TITLE
PRELIMINARY PLAN
// // ACTIVE RECREATION
AND LANDSCAPE PLA
SHEET NUMBER
8 OF 8
132
Página 133
Windward Ridge Item 4.
Building Architecture – While the architectural plan design will not begin until after Preliminary Approval, we expect
to construct buildings of similar design and finishes as we have used in other recent projects.
133
*Buildings shown were constructed by JLAM at our project Windward on the River located in Milford, DE and are intended to be indicative of the design for Windward Ridge.
Página 134
Windward Ridge Item 4.
Building Architecture – Front Perspective
134
*Buildings shown were constructed by JLAM at our project Windward on the River located in Milford, DE and are intended to be indicative of the design for Windward Ridge.
Página 135
Windward Ridge Item 4.
Building Architecture – Front and Side Perspective
135
*Buildings shown were constructed by JLAM at our project Windward on the River located in Milford, DE and are intended to be indicative of the design for Windward Ridge.
Página 136
Windward Ridge Item 4.
Garage Architecture – The garage architecture and finish materials will be similar to, and cohesive with, the main
apartment buildings.
136
*Garage buildings shown are intended to be indicative of the design for Windward Ridge.
Página 137
Windward Ridge Item 4.
Amenity Architecture – Similar to the buildings, amenity architectural plan design will not begin until after Preliminary
Approval. However, we expect to construct an amenity comparable in size and finishes to another recent JLAM
project.
137
*Amenity Building shown was constructed by JLAM at our project Windward on the River located in Milford, DE and are intended to be indicative of the design for Windward Ridge.
Página 138
Windward Ridge Item 4.
Amenity Architecture – Front Perspective
138
*Amenity Building shown was constructed by JLAM at our project Windward on the River located in Milford, DE and are intended to be indicative of the design for Windward Ridge.
Página 139
Windward Ridge Item 4.
Amenity Architecture – Rear Perspective
139
*Amenity Building shown was constructed by JLAM at our project Windward on the River located in Milford, DE and are intended to be indicative of the design for Windward Ridge.
Página 140
Windward Ridge Item 4.
Amenity Programming – Clubhouse Interior
Main Entrance
Office Business
Center
Yoga Room
M&W
Restrooms
Great Room
Game Tables
Fitness Center TV Lounge
Social Functions
Pool Deck
Pool Deck 140
*Amenity Building shown was constructed by JLAM at our project Windward on the River located in Milford, DE and are intended to be indicative of the design for Windward Ridge.
Página 141
Windward Ridge Item 4.
Amenity Programming – Great Room Typical Finishes
141
*Amenity Building shown was constructed by JLAM at our project Windward on the River located in Milford, DE and are intended to be indicative of the design for Windward Ridge.
Página 142
Windward Ridge Item 4.
Amenity Programming – Great Room Typical Finishes
142
*Amenity Building shown was constructed by JLAM at our project Windward on the River located in Milford, DE and are intended to be indicative of the design for Windward Ridge.
Página 143
Windward Ridge Item 4.
Amenity Programming – Yoga Studio & Fitness Center Typical Finishes
143
*Amenity Building shown was constructed by JLAM at our project Windward on the River located in Milford, DE and are intended to be indicative of the design for Windward Ridge.
Página 144
Windward Ridge Item 4.
Amenity Programming – Clubhouse Exterior – Typical Features
Outdoor
Kitchen /
Grilling area
Ample Pool
Deck with
Seating
Resort Style Pool
Social
Social / gathering
eating area
areas
Arch. /
shade Cornhole,
features bocce, game
area
144
*Illustration shown for programming intent only, not for specific locations on Windward Ridge amenity site
Página 145
Windward Ridge Item 4.
Amenity Programming – Clubhouse Exterior
145
*Amenity Building shown was constructed by JLAM at our project Windward on the River located in Milford, DE and are intended to be indicative of the design for Windward Ridge.
Página 146
Windward Ridge Item 4.
Amenity Programming – Clubhouse Exterior
146
*Amenity Building shown was constructed by JLAM at our project Windward on the River located in Milford, DE and are intended to be indicative of the design for Windward Ridge.
Página 147
Windward Ridge Item 4.
Amenity – Active Open Space – We plan to complement the wooded walking trails with our “Thicket” concept, which is
a curated selection of features concentrated within the designated area to enable residents to enjoy the surrounding
natural and serene setting.
147
*Area shown were constructed by JLAM at our project Welches Pond located in Lewes, DE and are intended to be indicative of the design for Windward Ridge.
Página 148
Windward Ridge Item 4.
Entrance Monument – Our planned entrance monument will be constructed of natural materials that compliment the
community aesthetic. It will be located in the median of the entryway, providing signage in both directions.
148
*Area shown were constructed by JLAM at our project Welches Pond located in Lewes, DE and are intended to be indicative of the design intent for Windward Ridge.
Página 149
Item 4.
S-23-19 Windward Ridge Apartments on West Denneys
Road
Public Comments Received (as of Noon 10/6/2023): Set 1
Item 1: Email of 9/29/2023 from Joseph Blevins noting need for
housing and also listing some questions.
149
Página 150
Item 4.
From: Security Guard
To: CompPlan
Cc: jlbhomemail@yahoo.com
Subject: EXTERNAL: S-23-19 Windward Ridge Apartments
Date: Friday, September 29, 2023 4:53:08 PM
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
I am excited about this project because there is a great need for housing in the Dover area but I do
have some questions. Denny’s Rd isn’t conveniently located near anything. Are there plans to build
sidewalks the entire length? I perceive it as a fairly dangerous road to be walking on. What about
public transportation? There are no bus stops along this section of Denny’s road either.
Thank you for your time,
Joseph Blevins
150
Página 151
Item 4.
From: Beth Knight
To: CompPlan
Subject: EXTERNAL: Apartment Plans on Denney"s Road
Date: Thursday, October 12, 2023 3:33:34 PM
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
As a longtime resident and homeowner in Carlisle Village, I would like to have my concerns over the
proposed 13 apartment buildings being built by our neighborhood.
My first concern relates to Denney's Road itself. This is a two-lane road with no shoulders, no turns lanes,
and no sidewalks. It curves where the proposed development is. Since being made part of Rt. 15, the
traffic can be very heavy, at times. There have been times where we cannot get out of our neighborhood
for several minutes. There have been a couple of occasions where we are stuck in our neighborhood due
to accidents or construction- and we have only one way in and out of our neighborhood, so it's inconvient.
It's also a concern because what if an ambulance or fire truck needs to get into Carlisle Village and can't?
I can foresee many more accidents if you put in 300 apartments and make no improvements to that road.
People flying left out of the apartments won't have a clear view of people coming right out of Carlisle
Village because of the curves in the road. Accidents near our entrance means we are either trapped in
our neighborhood or not able to get in and go to our homes. Before anything of this scale is built, serious
improvements need to be made to Denney's. It's the same road it was 50 years ago!!!
I have additional concerns but feel that this traffic situation is the priority right now.
I disagree with such a large apartment complex being built at that location.
Sincerely,
Beth A. Knight
151
Página 152
Item 5.
City of Dover
DATA SHEET FOR CONDITIONAL USE SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING of November 1, 2023
PLANNING COMMISSION MEETING of November 20, 2023
Plan Title: Mt. Zion A.M.E. Church Building Addition, C-23-03
Plan Type: Conditional Use Site Plan Application
Parcel Consolidation Plan
Associated Application: V-23-04
Owner: Mt. Zion A.M.E. Church
Project Engineer: W. Zachary Crouch, Davis, Bowen, and Friedel, Inc.
Location: Northeast corner of N. Queen Street and Fulton Street
Property Address: 101 & 107 N. Queen St.
Tax Parcels: ED-05-076.08-03-37.00-000
ED-05-076.08-03-38.00-000
Site Area: 0.17 acres +/- (7,405.2 square feet)
0.09 acres +/- (3,920.4 square feet)
Project Area: 0.26 acres +/- (11,325.6 square feet)
Zoning: RG-1 (General Residence Zone)
Existing Use: Place of Worship (Church)
Proposed Use: Place of Worship (Church) with Building Addition
Building Footprint Area: 5,152 Square Feet
Building Addition Footprint Area: 1,402 Square Feet
New Building Footprint Area: 6,554 Square Feet
Sanitary Facilities: City of Dover
Water Supply: City of Dover
Waivers Requested: None
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service 152
Página 153
City of Item 5.
Dover
CITY OF DOVER Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: November 1, 2023
APPLICATION Mt. Zion A.M.E. Church Building addition at 101 (and 107) N. Queen St.
FILE #: C-23-03 REVIEWING AGENCY: City of Dover Planning Office
CONTACT PERSON: Katherine Oehmke and Dawn Melson-Williams, AICP
PHONE #: 302.736.7196
I. PLAN SUMMARY
This application is for the review of a Conditional Use Site Plan for a 1,402 SF addition
(footprint) to 5,152 SF Building (footprint) for Mt. Zion A.M.E Church. The use of the subject
properties is as a Place of Worship (Church), which is a conditionally allowed use in the RG-1
Zone (General Residence Zone). The subject properties are zoned RG-1 (General Residence
Zone). The properties totaling 11,500 SF are located at the northeast corner of N. Queen Street
and Fulton Street. The owner of record for both parcels is A.M.E. Church of Dover. Property
Addresses: 101 N. Queen Street and 107 N. Queen Street. Tax Parcel IDs: ED-05-076.08-03-
37.00-000 and ED-05-076.08-03-38.00-000. Council District 4.
II. PROJECT DESCRIPTION
The site is located on the corner of Queen Street and Fulton Street with an alley on its east side.
The location consists of two parcels upon which the existing Church Building stands with the
front elevation facing N. Queen Street. The use of the subject properties is as a Place of Worship
(Church), which is a conditionally allowed use in the RG-1 Zone (General Residence Zone).
The Place of Worship structure known as Mt. Zion AME Church was built circa 1959 with later
renovations. The church building’s original construction was established prior to the current
zoning provisions of the City of Dover Zoning Ordinance thus making it a legal non-conforming
use and building. The project will add a building addition onto the existing church to allow for
offices and muti-function space used as accessory related to the church activities.
Previous Application V-23-04
The existing principal building exceeds the building coverage limitation of the Zoning Ordinance
and is considered legal non-conforming. Since the proposed project will increase the building
coverage, an application to the Board of Adjustment was required. The Applicant requested a
variance from the requirements of Article 3 §1.14(a)(v) of the Zoning Ordinance. This was to
allow an increase in the maximum sum of all areas permitted to be covered by a principal
building and accessory buildings from 20% to 56.89% to allow for a proposed building addition.
On September 20, 2023, the Board of Adjustment granted this variance to increase the area
permitted to be covered by buildings (Application V-23-04).
Surrounding Properties
153
Página 154
Item 5.
C-23-03 Mt. Zion A.M.E. Church Building Addition at 101 (and 107) N. Queen St.
Final DAC Report of November 1, 2023
Page 3 of 8
The properties in the blocks surrounding the Church site are zoned RG-1 (General Residence
Zone). The property (109 N. Queen Street) adjacent to the north contains a one-family detached
dwelling that is listed as a Vacant Building. Continuing to the north are other single family
detached dwellings. There are several churches along N. Queen Street in the proximity. A series
of parcels across the street from the subject site are owned by Mt. Zion A.M.E. Church. Directly
across from the church is a single family home owned by the applicant. There is also a parking
lot for the church.
III. ZONING REVIEW
RG-1 (General Residence Zone)
Zoning Ordinance, Article 3 Section 2. General residence zones (RG-1 and RG-2) list the
permitted uses, conditional uses, and other provisions of the RG-1 zone. In Article 3 Section
2.11, it notes for the RG-1 zone that the allowable uses include those uses permitted in the one-
family residence zones; this refers to Zoning Ordinance, Article 3 Section 1.
In the One-Family Residence Zones, Places of Worship are a Conditional Use and have specific
requirements for development. See code excerpt below.
Article 3 Section 1
1.14 The following uses are permitted, conditional upon the approval of the planning
commission in accordance with the procedures and subject to the general conditions set
forth in section 10.1 and to any specified requirements set forth below:
(a) Places of worship, including parish houses; [and] schools, including nursery schools,
kindergartens and day care centers in accordance with article 5, Supplementary
Regulations, section 14. Child day care facilities; philanthropic and eleemosynary
institutions; hospitals and sanitariums for general medical care; and funeral homes
subject to the following requirements:
i. Any school permitted under this paragraph [subsection 1.14(a)] shall be a nonprofit
organization within the meaning of the Internal Revenue Act and shall be registered
effectively as such thereunder.
ii. Any school permitted under this paragraph [subsection 1.14(a)], other than a
kindergarten, nursery school, or day care center, shall occupy a lot with an area of
not less than two acres, plus one acre for each 100 pupils for which the building is
designed.
iii. Any kindergarten or nursery school permitted under this paragraph [subsection
1.14(a)] shall be limited to a maximum of 50 children in zones R-8 thru R-20 and a
maximum of 100 children in all other zones. At least 100 square feet of outdoor play
space per child shall be provided. Outdoor play space shall be fenced or otherwise
enclosed on all sides and shall not include driveways, parking areas, or land unsuited
by other usage or natural features for children's active play space. Fencing or other
enclosures shall be a minimum height of four feet. The minimum lot area for each
ten, or remainder over the multiple of ten, children shall be the same as the minimum
lot area requirement for each dwelling unit in the districts in which such uses are to
be located.
iv. No such building or part thereof shall be erected with less than a 50-foot front yard or
nearer than 25 feet from any other street or property line.
v. The sum of all areas covered by all principal and accessory buildings shall not
exceed 20 percent of the area of the lot.
vi. Courts shall conform to the requirements of article 5, section 3 hereof.
154
Página 155
Item 5.
C-23-03 Mt. Zion A.M.E. Church Building Addition at 101 (and 107) N. Queen St.
Final DAC Report of November 1, 2023
Page 4 of 8
The current use as a Place of Worship is allowed as a Conditional Use per Article 3 Section 1.14
(a). The current use as a Place of Worship since established prior to the adoption of the Zoning
Ordinance is considered legal non-conforming and can continue indefinitely per Zoning
Ordinance, Article 7. Nonconforming Buildings and Uses. For any expansion of the use such as
this Building Addition, it would be subject to the current zoning provisions and would require
consideration through the Conditional Use application process to become a conforming use.
With the proposed Building Addition, the property would also become subject to the
requirements listed (items i through vi). Specifically for this use as a Place of Worship, the
requirements of Item iv and Item v would apply.
The placement of the building on the lots does not meet the setback provisions outlined in
Item iv; however, these setbacks are considered legal non-conforming and are allowed to
continue as long as the degree of nonconformity is not increased or any new conformity
created (per Zoning Ordinance, Article 7. Nonconforming Buildings and Uses). Any
Building Addition would be limited to the existing setbacks of the existing building. Any
Building Addition could not be placed any closer to the property lines than the existing
building. The proposed Building Addition complies with this provision.
In the case of Item v for the coverage of the lot by the principal building, a Building
Addition increases the degree of nonconformity for the building coverage compared to
the lot area. Thus, it required consideration of a variance that was approved with V-23-
04.
With Conditional Use Plan applications, the Planning Commission reviews the proposed project
to determine whether or not the intended use for the building is appropriate in type and scale for
the immediate neighborhood. The Commission must also consider whether or not the proposed
use will have an adverse impact on the future orderly development of the surrounding area. The
following sections of the Zoning Ordinance which relates to the role of the Commission in
reviewing Conditional Use Plan applications are particularly relevant when reviewing this
application:
Article 10 Section 1
1.1 Accessibility for emergency response. That all proposed structures, equipment or material shall
be readily accessible for fire, ambulance, police, and other emergency response;
1.2 Harmony of location, size and character. That the proposed use shall be of such location, size
and character that, in general, it will be in harmony with the appropriate and orderly development of
the zone in which it is proposed to be situated and will not be detrimental to the orderly development
of adjacent properties in accordance with the zoning classification of such properties;
1.3 Residential zones. That, in addition to the above, in the case of any use located in, or adjacent
to, a residential zone:
1.31 The location and size of such use, the nature and intensity of operations involved in or
conducted in connection therewith, its site layout and its relation to access streets shall be such that
both pedestrian and vehicular traffic to and from the use and the assembly of persons in connection
therewith will not be hazardous or inconvenient to, or incongruous with, the said residential district or
conflict with the normal traffic of the neighborhood; and
1.32 The location and height of buildings, the location, nature and height of walls and fences, the
nature and extent of landscaping, and other improvements on the site shall be such that the use will
not hinder or discourage the appropriate development and use of adjacent land and buildings.
155
Página 156
Item 5.
C-23-03 Mt. Zion A.M.E. Church Building Addition at 101 (and 107) N. Queen St.
Final DAC Report of November 1, 2023
Page 5 of 8
If the Planning Commission approves a Conditional Use Application, the use is granted as a
Conditional Use Permit. Such permits may be permanent, subject to limitations outlined in
Zoning Ordinance, Article 10 §1.41 or be required by the Commission to undergo periodic
renewal using the procedure described in Article 10 §1.42. Any Conditional Use Permit,
permanent or not, may be revoked using the procedure described in Article 10 §1.43 if the
conditions prescribed by the Commission in conjunction with the issuance of the Conditional
Use Permit have not been or are no longer being complied with.
IV. PARKING SUMMARY
In addition to the two handicapped spaces in front of the building along N. Queen Street, there is
an off-street parking for the Church in the parking lot across the street from the church at 110
and 120 N. Queen Street. Staff counted additional 25 spaces. There is another small parking lot
at 37 N. Queen Street with 6 spaces. Total off-street parking is 33 spaces. Using the parking
calculation in Zoning Ordinance, Article 6, Section 3.1, the requirement would be 33 parking
spaces based on the 6,554 SF footprint size of the building (and needs to be calculated based on
total floor area). A seat count of the sanctuary was not provided.
For: At Least One Parking Space For Each
Two hundred (200) square feet of floor area, but not
less than one (1) space for each four (4) seats, where
Places of worship provided
The parking requirement for this location for the existing Church Building is considered legal
non-conforming as the Building was constructed prior to enactment of the Zoning Ordinance.
There is on-street parking in the vicinity in addition to a sidewalk system for pedestrians.
Bicycle Parking
There is no current bicycle parking at the property, and there is no proposed bike parking on
the Site Plan. For every 20 parking spaces, there should be one bicycle parking space. It is
unclear if their parking lots include bicycle parking.
V. SITE CONSIDERATIONS
Building Access
The current main entrance to the Church is a set of large double doors. The proposed addition
will have an additional set of double doors in the north addition to the building. There are two
existing single doors on the south side of the building. The rear (east) side of the building will
remain to have 2 single doors for egress.
Lighting
While the architectural plans do not depict new lighting, Google Street View shows lights by the
doors and the large cross on the front of the building appears to be backlit. The demolition plan
shows that they are taking out a light pole from the ramp area.
Dumpster
There are no dumpsters shown in the proposed plan. Google Street View shows the large
trash/recycling bins at the back (east) side of the building along the alley. It appears that they
have City collection service with large black bins and a recycle bin. It is unclear if the bins are
stored inside or within the back fenced area along the alley.
156
Página 157
Item 5.
C-23-03 Mt. Zion A.M.E. Church Building Addition at 101 (and 107) N. Queen St.
Final DAC Report of November 1, 2023
Page 6 of 8
Sidewalks
There are sidewalks on the west and south sides of the building along N. Queen Street and Fulton
Street. The proposed addition has an ADA accessible ramp that connects the front sidewalk from
the front (west) side of the building into the addition.
VI. BUILDING ARCHITECTURE
When the Church was constructed in 1957-1959, the design of the church was modern. The
modest church addition design will allow the large stained-glass window to remain the focal
point of the structure. The Church has a raised first floor approximately a half story up with 8
steps to the entrance level. There are windows to the basement at street level. The basement
contains a kitchen, multi-purpose spaces, storage, and bathrooms. The addition to the Church
basement will house two more multi-purpose spaces with an accordion dividing wall and a
storage closet.
The roof line of the main church building is pitched. The entrance area at the rear of the building
along the alley, and the front entrance along N. Queen Street have flat roofs. The current office
area on the north side of the building also has a flat roof. The north side of the Addition has 2 tall
thin windows, and 2 double windows on the first floor. The basement will have 3 more windows
visible from the pedestrian level.
The Addition will have a dark brick exterior with 2 narrow tall windows on the west side facing
N. Queen Street. The front portion of the Addition will have an ADA ramp surrounded by wood
railings. The ramp will provide access to the church through the Addition from the surrounding
sidewalks. The roof will be flat, similar in height to the offices at the rear portion of the existing
building. The first floor addition will house a lobby, offices, a connecting corridor to the church
and additional multi-purpose spaces with another folding partition wall.
VII. TREE PLANTING AND LANDSCAPE PLAN
Development Area
The project site development area is most of the northern lot at 107 N. Queen Street.
Tree Plantings
The submitted plan does not include any new trees. There are 2 existing trees on the south side of
the property. According to the tree planting schedule in Article 5 Section 16.62, the tree
calculation is 1 tree for every 3,000 square feet of development area. The two parcels together
are 11,325 square feet. There should be 4 trees total, giving credit for the existing 2 trees on the
south side of the property. Please note a Tree Mitigation Plan on the Cover Sheet if you plan to
place your additional trees elsewhere than the two parcels in this application.
VIII. CITY AND STATE CODE REQUIREMENTS:
The subject proposal has been reviewed for code compliance, plan conformity, and completeness
in accordance with the agency’s authority and area of expertise. The following items have been
identified as elements which need to be addressed by the applicant:
1) Sheet C-001 and associated plan sheets:
a) Clarify building floor area versus building footprint. Provide each in square feet.
157
Página 158
Item 5.
C-23-03 Mt. Zion A.M.E. Church Building Addition at 101 (and 107) N. Queen St.
Final DAC Report of November 1, 2023
Page 7 of 8
b) The Zoning is not listed on the cover page.
c) Identify any bicycle parking on site or note if in parking lots.
d) City of Dover Engineer Signature Block not required.
e) Item 8, replace “Town” with “City of Dover”. Electric will be City of Dover.
f) Item 10, please add column with existing setbacks.
g) Item 16, list Building Footprint and the Building Floor Area. Make sure to clarify the
combined Floor Area for both floors of the addition to the building.
h) Add Tree Planting calculations.
2) A Record Plan Sheet is needed to combine parcels.
3) Page C-002: Line 15, Approved Site plans are valid for 2 years. Stormwater Management
Plans may be valid for 3 years. Please clarify which Plan is referenced and the correct
number of years if needed.
4) Page C-051:
i) The 50’ Setback line in the middle of the existing building should read “Property
Line”.
5) Page C-101:
(a) Proposed Addition square footage should indicate footprint.
(b) Please note Dumpster/Garbage storage location.
(c) Notate a Tree Planting Schedule. Based on requirement of 1 tree per 3000 SF of total
lot area. This project must provide a total of 4 trees (existing and proposed).
6) The applicant may seek approval of a Tree Mitigation Plan to plant the required trees
elsewhere. A written request must be submitted with reasons and concept for planting.
IX. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET
CODE OBJECTIVES:
In accordance with the Zoning Ordinance, Article 10 §1, the Planning Commission in
considering and acting upon Conditional Use Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
in subsections 1.1 to 1.3.
1) Conditional Use for Place of Worship: The applicant is seeking to expand an existing
Place of Worship building that pre-dates the enactment of the City’s Zoning Ordinance.
The use of the building is not changing; it is just expanding in size (floor area). The
Building Addition seeks to continue the use of the building as a Church facility at this
location in the neighborhood while modernizing the building for programming functions
and ADA accessibility. Planning Staff finds the proposal compatible with the area.
2) Bicycle Parking: Planning Staff recommends the installation of the bicycle parking rack
to serve the building either at the Church Building or at the nearby church owned parking
lot to allow to appropriate parking for this transportation option.
158
Página 159
Item 5.
C-23-03 Mt. Zion A.M.E. Church Building Addition at 101 (and 107) N. Queen St.
Final DAC Report of November 1, 2023
Page 8 of 8
Other agencies may recommend additional considerations to meet code objectives in accordance
with their areas of expertise. Action on all considerations identified in this section is at the
discretion of the Planning Commission.
X. ADVISORY COMMENTS TO THE APPLICANT:
1) If major changes and revisions to the Conditional Use Site Development Plan occur in the
finalization of the Plan, contact the Planning Office. Examples include reorientation of
the addition, relocation of site component, and increases in floor area count. These
changes may require resubmittal for review by the Development Advisory Committee,
Planning Commission, or other agencies and commissions making recommendations
regarding the plan.
2) Following Planning Commission approval of the Conditional Use Site Plan, the Plan
must be revised to meet all conditions of approval from the Development Advisory
Committee or as otherwise noted. A Check Print must be submitted for review by
Planning Office Staff and the other commenting agencies. Upon determination that the
Plan is complete and all agency approvals have been received, copies of the Plan may be
submitted for final endorsement (Final Plan Approval).
3) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
4) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate site inspections, Pre-Construction meeting and permits/licenses
are required.
5) For building new construction, the requirements of the building code and the fire code
must be complied with. Consult with the Chief Building Inspector and City of Dover Fire
Marshal for these requirements. The resolution of these items may impact the site design
including such items as building dimensions and height, building openings, and fire
protection needs, etc.
6) The applicant should be aware that Conditional Use Site Plan approval does not represent
a Sign Permit, nor does it convey permission to place any sign on the premises. Any
proposed site or building identification sign shall require a Sign Permit from the City of
Dover prior to placement of any such sign unless deemed internal to the campus. It is
recommended that the applicant discuss the sign regulation requirements with the
Planning Staff prior to applying for a Sign Permit.
7) The applicant should be aware that Conditional Use Site Plan approval does not represent
a Building Permit and associated construction activity permits. A separate application
process is required for the issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
159
Página 160
CITY OF DOVER Item 5.
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: NOVEMBER 1, 2023
APPLICATION: Mt. Zion AME Church Building Addition at 101 North
Queen Street
FILE #: C-23-03
REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater
CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services
CONTACT PHONE #: 302-736-7025
CONTACT PHONE #: jlyon@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS
A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
SANITATION
1. The current solid waste collection provided by the City of Dover can still be utilized. If this addition provides additional solid
waste containers, above and beyond the existing, the property shall utilize private services.
WATER
1. Our office has no objection to the conditional use proposed for the subject property.
2. Due to the fact that this property is changing uses, water usage projections (peak demand or plumbing fixtures) must be submitted
to our office to correctly determine the size of the domestic and irrigation (if applicable) water meter for the building. These
projections must be submitted prior to approval so the meter size can be placed on the final site plan, if an upgrade is required.
The proposed water meter must be installed in a pit per City of Dover requirements and manufacturer’s recommendations. Also,
a dual check valve is required downstream of the meter.
3. On October 24, 2022, City of Dover Council approved the new Cross Connection Control Program. This program requires certain
backflow prevention assemblies on water service connections to the city’s distribution system. The type of assembly will be
determined by the activity that will occur in the new addition.
WASTEWATER
1. Our office has no objection to the conditional use proposed for the subject property.
2. Sizing (flow) calculations must be submitted for all sanitary sewer laterals (other than for single-family dwellings) showing that
velocity and all other requirements are met. All proposed wastewater utility components must meet the requirements of the
Public Utilities Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information.
GENERAL / STORMWATER / STREETS
1. None.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
160
Página 161
Item 5.
Mt. Zion AME Church Building Addition at 101 North Queen Street
File #: C-23-03
November 1, 2023
Page 2 of 2
STREETS / SANITATION / STORMWATER / WATER / WASTEWATER / GENERAL
1. None
ADVISORY COMMENTS TO THE APPLICANT
WATER
1. Water impact fees may be associated with this project.
2. One meter shall be utilized for the entire building.
WASTEWATER
1. Wastewater impact fees may be associated with this project.
STREETS / SANITATION / STORMWATER / GENERAL
1. None
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE
P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
161
Página 162
C F
C-23-03
Item 5.
I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 11/01/23 D S
O H
V A
E L
APPLICATION: Mt. Zion AME Church Building Addition at 101 North Queen St
R
FILE #: C-23-03 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
josika@dover.de.us
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed occupancy classification is assembly.
2. Building Access shall be no further than 50 feet from a primary entrance.
Where buildings are provided with an automatic sprinkler system installed in accordance with
NFPA 13, access shall be no further than 100 feet from the primary entrance.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)
3. Perimeter access shall be N/A and clearly shown on the plans.
Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings
of two or more stories, measured from the face of the building at grade with a maximum slope of
ten percent (10%). Plantings and utility services (includes condenser units, transformers, etc.)
shall be permitted within the perimeter access, and shall not interfere with emergency services
fire ground operations.
If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building
perimeter shall not be included in the calculation of Percent of Perimeter Access.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)
Where parking is located between the building and perimeter access area, parking shall not be
located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior
wall for building of two or more stories.
4. Fire lanes shall cover 50% of the proposed building.
162
Página 163
Item 5.
Fire lanes are required to be 24 feet wide and run along the front of the building as determined by
the primary entrance(s). In cases where there is more than one primary entrance(s), each shall be
served by a fire lane even if this exceeds the percentage as required.
The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and
the closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one
or two stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in
height.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5)
5. Gated Areas: Fire Department access shall be provided to the property through the use of a
system or device approved by the Fire Marshal. The system or device required shall be located in
an area accessible to the fire department and approved by the Fire Marshal. All gates shall be
either automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate.
The owner or their representative shall meet with the Fire Marshal prior to submission to agree
on the system. A letter of agreement shall be created and signed by both parties. The letter shall
include a detailed description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their
representative shall meet with the Fire Marshal prior to submission to agree on the means to
open. A letter of agreement shall be created and signed by both parties. The letter shall include a
detailed description of the manual means to open.
To be considered accessible for fire department apparatus the actual clear openings shall be not
less than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate
shall be setback from the perpendicular street by at least 50 feet.
Please contact this office to discuss options available to comply with this requirement.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
6. NFPA 72 compliant Fire Alarm System required per occupancy code requirements.
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an
occupancy determined to be a place of assembly by the fire marshal and is capable of receiving an
occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with
NFPA codes governing the installation of fire alarms and the National Electrical Code.
Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined
to be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50
percent of the assessed value of the building and is capable of receiving an occupant load 75
persons or greater or is being enlarged to receive an occupant load of 75 persons or greater, shall
be required to install a complete fire alarm system in accordance with NFPA codes governing the
installation of fire alarms and the National Electrical Code.
Public mode audible requirements. To ensure that audible public mode signals are clearly heard by
occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average
ambient sound level or five decibels (dB) above the maximum sound level having a duration of at
least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area
required to be served by the system using the A-weighted scale dBA. In the event the stated
requirement cannot be met a shunt trip relay/switches shall be the approved method of meeting
the intent of this section of the Code.
(City Code of Ordinances 46-171)
163
Página 164
Item 5.
7. Sprinkler system reuired. System is to be monitored by an approved Fire Alarm System.
This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions
which are modified by more than 50% after the effective date of these Regulations. The 50%
figure shall be calculated utilizing the gross square footage of the building, structure, marine
vessel, premises and conditions as to arrive at the correct application.
Any proposal that is presented to the Office of the State Fire Marshal for review and approval for
a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross square footage
of a non-sprinklered building, may not have another such project for the same building submitted for
review and approval any sooner than three (3) years after the date of the final inspection unless sprinkler
projection is provided throughout the entire building.
In all buildings exceeding 10,000 square feet of aggregate, gross floor area.
In all buildings in excess of 40 feet in height or more than four (4) stories in height.
In all buildings or areas thereof used for the storage, fabricating, assembling, manufacturing,
processing, display or sale of combustible goods, wares, merchandise, products, or materials when more
than two (2) stories or 25 feet in height.
In all basement areas exceeding 2,500 square feet floor area.
In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and exceeding
two (2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or
Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment buildings
storage areas except individual unit closets that are located within individual residential living units.
In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA 101, as
adopted and/or modified by these Regulations. In all buildings or areas classified as "high hazard" under
the Life Safety Code, NFPA 101, or "extra hazard" under the Standard for the Installation of Sprinkler
Systems, NFPA 13, as adopted and/or modified by these Regulations.
All buildings used as dormitories, in whole or in part, to house students at a public or private
school or public or private institution of higher education. (16 Del.C. Ch. 88) This applies to all such
dormitories regardless if new or existing.
(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)
Places of assembly shall be sprinklered throughout in accordance with the most recently adopted
edition of NFPA 13 when the following apply:
All new indoor places of assembly with an occupant load of 150 persons or greater.
Any interior renovations of 50 percent or more to an existing place of assembly with an occupant
load greater than 150 persons.
Any additions or increase in interior size to an existing place of assembly that would create an
occupant load of 150 persons or greater.
Places of assembly where alcohol is served for consumption on the premises shall be sprinklered
throughout in accordance with the most recently adopted edition of NFPA 13 when the following
apply:
All new indoor places of assembly with an occupant load of 100 persons or greater and where
alcohol will be served for consumption on the premises.
Any interior renovation of 50 percent or more to an existing place of assembly with an occupant
load greater than 100 persons and where alcohol will be served for consumption on the premises.
164
Página 165
Item 5.
Any additions or increase in interior size to an existing place of assembly which would create an
occupant load of 100 persons or greater and where alcohol will be served for consumption on the
premises.
New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout in
accordance with the most recently adopted edition of NFPA 13.
(City of Dover Code of Ordinances 46-162)
8. Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow located
within 50 feet of main entrance. Access to the Fire Department Connection must be clear
unobstructed access as defined by the AHJ.
Fire department connections. Unless otherwise approved by the fire marshal, fire department
connections shall be on the street side of the building and shall be located and arranged so that
hose lines can be readily and conveniently attached to without interference from any nearby
obstructions as defined by the fire marshal's office. Fire department connections shall be a five-
inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover
Fire Hydrant and within 50 feet of the main entrance of the structure it serves. All fire
department connections shall be not less than three feet nor more than five feet in height above
finished grade. The fire marshal shall have the authority to require more stringent
requirements when deemed necessary. (City of Dover Code of Ordinances 46-162)
9. Parking and/or obstructions shall be prohibited in front of fire department connections for a
distance measuring from the center line and extending four feet on both sides.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
10. All standpipe and sprinkler connections shall be marked as prescribed within the appropriate
section of this regulation and as illustrated by the appropriate figures of this regulation. All
standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow
demarcation lines to define specific areas, Solid yellow demarcation lines shall be measured from
the center line of the connection and extend for a distance of four feet (4') on both sides, and
where parking is allow between the building and the street or fire lane the solid yellow
demarcation lines shall extend from the end of the sidewalk surface to the street or fire lane
(Markings shall not be required on the sidewalk surface). All fire department connections
(standpipe and sprinkler) shall have a minimum 12" x 18" sign that reads FIRE DEPT.
CONNECTION, sign lettering shall be a minimum of 3 inches (3") in height with red scotchlite
letters on white scotchlite background. The sign shall be clearly visible from the fire lane or
roadway, and signs using NFPA international symbols shall be an acceptable alternative. (2021
Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)
11. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators,
and valves located inside structures shall have impact protection, except when located in
separate protected utility rooms.
Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The
bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in
concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48
inches (four ft.) in height above the finish grade elevation. Any deviation of the stated
requirements must be approved by the fire marshal and/or chief building inspector. The above
dimensions shall serve as the requirement for installation; however, the fire marshal and/or chief
building inspector shall have the authority to require more stringent dimensions to fit the needs
of devices warranting impact protection.
165
Página 166
Item 5.
Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors
shall be of fluorescent or have a reflective coating. Any deviation of the stated requirements must
be approved by the fire marshal and/chief building inspector.
(City of Dover Code of Ordinances, 46-4)
12. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley,
shall have displayed on that wall, in legible, easily read characters which are of contrasting color
to the background, the proper street number for such house, building, or structure in accordance
with the following:
One-family and two-family residential structures, height, the number shall measure a minimum of four
inches in height, location, the number shall be placed on the house above or to the left or right of
the front entrance, color, the number shall be contrasting to the background color, Arabic numerals,
all numbers shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when
identifying individual apartments with exterior doors, and 12 inches when identifying buildings
with apartment complexes where there are two or more buildings not assigned street addresses.
Individual buildings with street addresses shall have numbers measuring six inches, location,
numbers shall be placed either in the center of the building or on the street end of the building so
as to be visible from either the public or private street or from the parking lot, color, numbers shall
be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic
numerals.
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in
height, location generally, numbers shall be placed either in the center of the building or on the
street end of the building so as to be visible from either the public or private street or from the
parking lot,
property line or driveway, should the building be located far enough from a public or private road so
that the numbers are not clearly visible from the street, then the street address shall also be
posted on the property at or near the property line or driveway to said building,
color; each building, numbers shall be contrasting to the background color and shall be placed on
each building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite
number affixed to the front of the tenant space and on the outside of the rear door which
corresponds with that tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
13. TBD A lock box (Knox) containing any and all means necessary for fire department access shall
be provided at the following occupancies: any occupancy that contains a fire alarm signaling
system that is monitored off-site, or any occupancy that contains an automatic sprinkler system.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
166
Página 167
Item 5.
Secured key systems. When required; exemption. A secured key system shall be required for any new
or existing building where a fire alarm or sprinkler system is being installed. It shall be the
responsibility of the owner or occupant to keep a set of keys in the secured key box that are
current to the locks of the protected occupancy. Buildings with 24-hour staffing or guard
service shall be exempt from this subsection.
Location. The secured key system shall be located as close to the main entrance as possible.
Should the building design not allow the secured key system to be located by the main
entrance, the fire marshal and fire chief shall come to an agreement as to an alternate
location for the key box. A secured key system, once installed, shall not be obstructed from
view or obstructed by any means that would delay the fire department access to the box.
Required keys. Keys to be secured in the key box shall include keys to all points of ingress or
egress, whether on the interior or exterior of the building, and keys to locked mechanical
rooms, electrical rooms, elevator rooms, fire alarm and sprinkler controls and any area
protected by automatic fire detection. Keys to individual residential apartment units are not
required.
Ordering responsibility. It shall be the responsibility of the general contractor to order the key
box for new buildings. It shall be the responsibility of the owner or tenant to order the key
box for existing buildings.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted
before the installation of a key box.
(City Code of Ordinances 46-127)
Knox Box to be mounted 6 feet above ground level
14. All required means of egress shall have an exit discharge consisting of a non-slip surface and
leading to and terminating at a public way. NFPA 101
15. Project to be completed per approved Site Plan.
16. Full building and fire plan review is required.
17. Construction or renovations cannot be started until building plans are approved.
18. Fire alarm systems, fire suppression systems, hoods, exhaust ducts, and hood suppression
systems require a fire permit from the Fire Marshal’s Office. This work cannot be started until
the permit is approved.
19. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
20. The following is City Ordinance, Appendix B-Zoning, Article 8 Enforcement and Penalties:
Section 1. - Building permits.
No building or structure in any district shall be erected or structurally altered without a building permit
duly issued upon application to the building inspector. No building permit shall be issued unless the
proposed construction or use is in full conformity with all the provisions of this ordinance. Any building
permit issued in violation of the provisions of this ordinance shall be null and void and of no effect,
without the necessity for any proceedings for revocations or nullification thereof, and any work
undertaken or use established pursuant to any such permit shall be unlawful (see section 4 for
penalties).
167
Página 168
Item 5.
1.1 No building permit shall be issued for the construction or alteration of any building upon a lot
without frontage upon, or legal permanent access to, a public street improved to the satisfaction of the
planning commission, or without access to a public sewer.
1.2 No building permit shall be issued for any building where the site development plan of such
building is subject to approval by the planning commission, except upon approval of such plans
approved by the said commission.
1.21 No building permit shall be issued for any building in a subdivision unless the subdivision plot has
been approved by the planning commission.
1.3 No building permit shall be issued for a building to be used for any conditional use in any zone
where such use is allowed only with approval of the planning commission, unless and until such
approval has been duly granted by the said commission.
(Ord. of 7-12-1993, § 3)
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. The plan states the current building is 5,152 SF and the new addition is 1,402 SF. The
plan then shows dimensions of 102’ x 25.4’ (times about two) which is 5,181 SF. This
appears to be the first floor only and does not include the basement. I need to square
footage of the entire building in order to determine several items/requirements.
o Received an email on 11/03/23 from Timothy Matzner confirming that the total
square footage will be 13,070 S.F. and that they will be adding a new sprinkler
and fire alarm system as part of the project.
2. PA N/A as outlined in item # 3 listed above.
3. FL 50% as outlined in item # 4 listed above.
o The N Queen St and Fulton St roadway can be counted towards the Fire Lane.
4. I don’t believe this building currently has a fire alarm system, please confirm the same.
Fire alarm system TBD.
o Older fire alarm currently in place, new fire alarm will be installed with this
project.
5. If a FAS is required, the Hood suppression would need to be tied to the FAS
6. I don’t believe this building currently has a sprinkler system, please confirm the same.
Sprinkler system TBD.
o A new sprinkler system will be installed with this project.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2021 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
168
Página 169
Item 5.
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
T
===============================================================
APPLICATION: C-23-03 Mt Zion AME Church Addition 101 North Queen Street
FILE#: C-23-03 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Michael Vandevander PHONE#: 302-760-2141
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
No person, firm, corporation or the like shall construct, open, reconstruct, maintain, modify or use any
crossing or entrance onto a state-maintained highway, street or road, including any drainage modifications
leading into or carried by the highway drainage system, without first having complied with standards and
regulations adopted by the Department and having obtained a permit issued by the Department.
Please contact the Delaware Department of Transportation - Development Coordination section to begin
permit process.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
1. DelDOT has no comment and require no submission for this project as it is city limits.
169
Página 170
Item 5.
CITY OF DOVER ELECTRIC
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: NOV 1, 2023
APPLICATION: Mt. Zion AME Church Building Addition at 101 North
Queen Street
FILE #: C-23-03
REVIEWING AGENCY: City of Dover Electric Department
CONTACT PERSON: Paul Waddell, Electric Director
Shawn Burgett, Engineering Services & System Operations Superintendent
CONTACT PHONE #: 302-674-7568
CONTACT EMAIL: sburgett@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. Any relocation or upgrade of existing electrical equipment will be engineered by the City of Dover Electric
Department. Developer may be required to perform a quantity of the relocation. Any work performed by the City of
Dover will be at the owner’s expense.
2. Owner is responsible for locating all existing underground facilities to include electric, water and gas.
3. Owner is responsible for site and/or street lighting.
4. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
5. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
6. All Engineering and design for Dover Electric will be engineered upon receipt of final approved plans. All Engineering
work will be furnished by the City’s Electric Engineering Department.
GENERAL
1. Final site plan must be submitted in a digital format compatible with AutoCAD 2010 (.dwg format) and Adobe Reader
(.pdf format), if applicable.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
1. Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook
is now available on the website at the following link: https://evogov.s3.amazonaws.com/media/27/media/13108.pdf.
170
Página 171
Mt. Zion AME Church Building Addition at 101 North Queen Street Item 5.
File #: C-23-03
November 1, 2023
Page 2 of 2
ADVISORY COMMENTS TO THE APPLICANT
1. Provide load sheets as soon as possible for proper sizing of transformers and creation of primary fee estimates.
Current load sheets can be found at the following link:
https://www.cityofdover.com/media/Electric%20Department/COD%20Electric%20Load%20Sheet.pdf.
2. Electric service is currently provided by the City.
3. If any upgrade to electric supply needs to be accomplished, customer will be responsible for all costs associated with
the project.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON
AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
171
Página 172
KENT CONSERVATION DISTRICT
Item 5.
1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
NOVEMBER 2023
APPLICATION: Mt. Zion AME Church Building Addition at 101 & 107 North Queen Street
FILE #: C-23-03
REVIEWING AGENCY: Kent Conservation District
CONTACT: Kate Owens
PHONE: 302-608-5370
EMAIL: stormwater@kentcd.org
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY
AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS
ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
Source: 2019 Delaware Sediment and Stormwater Regulations
CITY AND STATE CODE REQUIREMENTS:
The proposed improvements will disturb less than 5,000 square feet and is therefore exempt from the
Delaware Sediment and Stormwater Regulations. Kent Conservation District has no objection to the
conditional use site plan for the above referenced site.
172
Página 173
Item 5.
ME MORANDUM
TO: City of Dover Planning Office
FROM: Malcolm Jacob, Transportation Planner
DATE: 11/3/2023
SUBJECT: DAC Comments 11/2023
Dear Members of the Planning Office,
Attached, please find comments submitted by Dover Kent MPO for each of the current Development
Advisory Committee (DAC) site plan reviews. Plans were reviewed during the Staff DAC meeting of
Wednesday, November 1, 2023, and comments are being submitted in advance of the Applicant DAC
meeting of Wednesday, November 8, 2023.
Please reach out to the MPO if further input is needed.
Sincerely,
Malcolm Jacob
Transportation Planner
Dover/Kent County Metropolitan Planning Organization
Malcolm.Jacob@doverkentmpo.org
(302) 387-6030
https://doverkentmpo.delaware.gov/
POB 383 / Dover, DE 19903 / http://doverkentmpo.delaware.gov / (302) 387-6030 FAX: (302) 387-6032 173
Página 174
Item 5.
1. C-23-03 Mt. Zion AME Church Building Addition at 101 North Queen Street (and 107 North
Queen Street)
No objections to the current site plan. Sidewalks are already present, and the plan includes
accessibility ramps.
2. S-23-20 Cold Storage Warehouse at 451 Garrison Oak Drive
No objections to the current site plan, provided developers ensure the site is ADA-compliant.
(Accessible pedestrian paths, ramps and striping at crossings, etc.)
3. S-23-21 BHD Operations Facility at 250 Garrison Oak Drive
No objections to the current site plan, provided developers ensure the site is ADA-compliant.
(Accessible pedestrian paths, ramps and striping at crossings, etc.)
POB 383 / Dover, DE 19903 / http://doverkentmpo.delaware.gov / (302) 387-6030 FAX: (302) 387-6032 174
Página 175
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Item 5.
ENGINEER'S STATEMENT
I, W. ZACHARY CROUCH, P.E., HEREBY STATE THAT I AM A REGISTERED ENGINEER IN
MT ZION AME
DATA COLUMN THE STATE OF DELAWARE, THE THE INFORMATION SHOWN HEREON HAS BEEN
PREPARED UNDER MY SUPERVISION AND TO MY BEST KNOWLEDGE REPRESENTS
1 TAX MAP ID 2-05-07608-03-3700-000, GOOD ENGINEERING PRACTICES AS REQUIRED BY THE APPLICABLE LAWS OF THE
O 2-05-07608-03-3800-000 STATE OF DELAWARE.
2 DEED REFERENCE BOOK: C 32, PAGE: 31
3 APPROXIMATE PROJECT CENTER LATITUDE LONGITUDE
39.1621461° 75.5309618°
4 ENGINEER OWNER
CHURCH ADDITION
DAVIS, BOWEN & FRIEDEL, INC. MT. ZION A.M.E. CHURCH Professional Certification. I hereby certify that
these documents were prepared or approved by
1 PARK AVENUE 101 N QUEEN ST. me, and that I am a duly licensed Professional
MILFORD, DE 19963 DOVER, DELAWARE 19904 Engineer, in the laws of the State of Delaware
TIMOTHY M. METZNER, RLA License No. 12734 Expiration Date: 06-30-24
PHONE: (302) 424-1441 W. ZACHARY CROUCH, P.E. DATE
N DAVIS, BOWEN & FRIEDEL, INC.
EMAIL: tmm@dbfinc.com
1 PARK AVENUE
5 DATUM HORIZONTAL VERTICAL MILFORD, DE 19963
NAVD 83 (DE STATE PLANE) NAVD 88
6
7
ZONING
LAND USE
EXISTING
GENERAL
RESIDENCE (RG1)
EXISTING
PROPOSED
GENERAL
RESIDENCE (RG1)
PROPOSED
PRELIMINARY PLANS OWNER'S STATEMENT
I, MT. ZION A.M.E. CHURCH, HEREBY STATE THAT I AM THE OWNER OF THE
PROPERTY DESCRIBED AND SHOWN ON THIS PLAN, THE PLAN WAS MADE AT MY
LAND USE LAND USE
CITY OF DOVER
DIRECTION. I ACKNOWLEDGE THE SAME TO BE MY ACT AND DESIRE THE PLAN TO BE
8 UTILITY PROVIDERS SEWER WATER GAS ELECTRIC DEVELOPED AS SHOWN IN ACCORDANCE WITH ALL APPLICABLE LAWS AND
M TOWN TOWN N/A N/A REGULATIONS.
9 POSTED SPEED LIMIT FULTON ST (LOCAL ROAD) N QUEEN ST (KCR 190A)
25 MPH 25 MPH
10
11
FLOODPLAIN
TRANSPORTATION
IMPROVEMENT DISTRICT (TID)
THE PROPERTY IS NOT IMPACTED BY THE 100 YEAR FLOODPLAIN AS
DETERMINED BY FEMA PANEL 10001C0166H, DATED MAY 05, 2003 &
BY FEMA PANEL 10001C0167H, DATED MAY 05, 2003.
THE PROPERTY IS NOT LOCATED IN A TRANSPORTATION IMPROVEMENT
DISTRICT (TID). DISTANCE TO NEAREST TID (MILFORD) : 18.244 MI.
KENT COUNTY, DELAWARE
MT. ZION A.M.E. CHURCH DATE
L 12
13
GROUNDWATER RECHARGE
WELLHEAD PROTECTION AREA
THE PROPERTY IS LOCATED IN AN AREA OF FAIR GROUNDWATER RECHARGE.
THE PROPERTY IS NOT LOCATED IN A WELLHEAD PROTECTION AREA.
DBF# 4335A001 101 N. QUEEN ST.
DOVER, DELAWARE 19904
14 WETLANDS THE PROPERTY IS NOT IMPACTED BY STATE AND/OR FEDERALLY REGULATED
WETLANDS.
JUNE 2023 APPROVED
15 CODE COMPLIANCE REQUIRED PROPOSED
FRONT SETBACK 50 FT 50 FT CITY OF DOVER ENGINEER:
MT ZION AME CHURCH ADDITION
SIDE SETBACK 25 FT 25 FT
K
REAR SETBACK 25 FT 25 FT
MAXIMUM DENSITY N/A N/A
MAXIMUM BUILDING HEIGHT 35 FT (2.5 STORIES) 35 FT (2.5 STORIES)
PARKING N/A N/A
16 AREAS EXISTING PROPOSED
SITE AREA 11,520.00 SF. (0.264 AC.) (100.00%) 11,520.00 SF. (0.264 AC.) (100.00%)
J NAME DATE
IMPERVIOUS COVER 6,315.08 SF. (0.145 AC.) (54.82%) 7,776.79 SF. (0.179 AC.) (67.51%)
KENT COUNTY, DELAWARE
AGREEMENT #
BUILDING FOOTPRINT 5,152 SF. (0.118 AC) (44.72%) 1,402 SF. (0.032 AC) (12.17%)
OVERALL BUILDING FOOTPRINT --- 6,554 SF. (0.150 AC) (56.89%)
INDEX OF SHEETS
CITY OF DOVER
GENERAL
C-001 TITLE SHEET
C-002 LEGEND & NOTES
I
DEMOLITION PLAN
C-051 EXISTING CONDITIONS
C-052 PRELIMINARY DEMOLITION PLAN
SITE PLAN
C-101 PRELIMINARY SITE & GRADING PLAN
PE
PE
PE
H PE
PE
PE
PROJECT LOCATION PROJECT LOCATION
G
F
© 2023 Microsoft Corporation © 2023 TomTom
VICINITY MAP SCALE: 1" = 6 MILES LOCATION MAP SCALE: 1" = 500'
E
0' 6 MI 12 MI 18 MI 0' 500' 1000' 1500'
SCALE: 1" = 6 MILES SCALE: 1" = 500'
D
P:\4335\4335a001-mt zion ame church\CAD\SHEET\PRELIM\4335A001-C-001-TITLE.dwg Oct 06 , 2023 - 9:02am PERY
Date:
C
JUNE 2023
Scale:
AS SHOWN
Dwn.By:
YAP
Proj.No.:
4335A001
B
TITLE SHEET
A
Dwg.No.:
C-001
175
THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2023
Página 176
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Item 5.
GENERAL NOTES DEMOLITION NOTES EXISTING SYMBOLS PROPOSED SYMBOLS
O 1. THE CONTRACTOR SHALL NOTIFY THE FOLLOWING TWO WEEKS PRIOR TO THE START OF CONSTRUCTION AND 1. MISS UTILITY OF DELMARVA SHALL BE NOTIFIED THREE CONSECUTIVE WORKING DAYS PRIOR TO EXCAVATION, AT 1-800-282-8555.
SHALL APPRISE AND COORDINATE DURING ALL PHASES OF CONSTRUCTION: LINETYPE DESCRIPTION LINETYPE DESCRIPTION
1.1. CITY OF DOVER PUBLIC WORKS DEPARTMENT 302-736-7025 2. EXISTING UTILITIES ARE SHOWN IN ACCORDANCE WITH THE BEST AVAILABLE INFORMATION. COMPLETENESS OR CORRECTNESS THEREOF
1.2. DAVIS, BOWEN & FRIEDEL, INC. 302-424-1441 IS NOT GUARANTEED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE UTILITY COMPANIES INVOLVED IN ORDER TO
1.3. KENT CONSERVATION DISTRICT 302-608-5370
SECURE THE MOST ACCURATE INFORMATION AVAILABLE AS TO UTILITY LOCATION AND ELEVATION. NO CONSTRUCTION AROUND OR
ADJACENT TO UTILITIES SHALL BEGIN WITHOUT NOTIFYING THEIR OWNERS AT LEAST 48 HOURS IN ADVANCE. THE CONTRACTOR SHALL PROPERTY LINE PE PROPERTY LINE
TAKE THE NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED SERVICE AND ANY DAMAGE
2. MISS UTILITY OF DELAWARE SHALL BE NOTIFIED THREE (3) CONSECUTIVE WORKING DAYS PRIOR TO EXCAVATION, DONE TO THEM DUE TO HIS/HER NEGLIGENCE SHALL BE IMMEDIATELY AND COMPLETELY REPAIRED AT THE CONTRACTOR'S EXPENSE. TO R/W RIGHT-OF-WAY LINE
AT 1-800-282-8555. LOCATE EXISTING UTILITIES IN THE FIELD PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL CONTACT MISS UTILITY OF DELMARVA. EX-R/W RIGHT-OF-WAY LINE Professional Certification. I hereby certify that
these documents were prepared or approved by
me, and that I am a duly licensed Professional
3. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND DISPOSING IN A LOCATION APPROVED BY ALL GOVERNING
3. BOUNDARY SURVEY BY DAVIS, BOWEN & FRIEDEL INC JUNE 2023. BASE TOPOGRAPHY PREPARED BY DAVIS, BOWEN
& FRIEDEL INC. BOUNDARY AND TOPOGRAPHIC SURVEY DATA PROVIDED BY DAVIS, BOWEN & FRIEDEL INC. AUTHORITIES, OF ALL ABOVE GROUND STRUCTURES, UNDERGROUND STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS, PARKING, ++ EASEMENT PE EASEMENT Engineer, in the laws of the State of Delaware
License No. 12734 Expiration Date: 06-30-24
DRIVES, DRAINAGE STRUCTURES, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN ON THE REMAINING PLANS CAN BE
N CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE
2. THIS PROJECT USES DATUM NAD83 DELAWARE STATE PLANE. COMPACTED FILL MATERIAL PER THE SPECIFICATIONS.
X FENCE X FENCE - CHAINLINK
3. CONTRACTOR SHALL PROVIDE STAKEOUT NECESSARY FOR THE INSTALLATION OF UTILITIES, STORM DRAINS, 4. THE CONTRACTOR SHALL REMOVE AND IMMEDIATELY REPLACE, RELOCATE, RESET OR RECONSTRUCT ALL OBSTRUCTIONS IN THE ROAD
PAVING AND ALL OTHER SITE WORK INCLUDED IN THESE PLANS. ALL STAKEOUT WORK IS TO BE PERFORMED WAY, INCLUDING, BUT NOT LIMITED TO, MAILBOXES, SIGNS, LANDSCAPING, LIGHTING, PLANTERS, CULVERTS, DRIVEWAYS, PARKING AREAS,
CURBS, GUTTERS, FENCES, OR OTHER NATURAL OR MAN-MADE OBSTRUCTIONS. TRAFFIC CONTROL, REGULATORY, WARNING AND 24 CONTOUR FENCE - SPLIT RAIL
UNDER THE DIRECT SUPERVISION OF A PROFESSIONAL LAND SURVEYOR REGISTERED IN THE STATE OF
DELAWARE. INFORMATIONAL SIGNS SHALL REMAIN FUNCTIONAL AND VISIBLE TO THE APPROPRIATE LANES OF TRAFFIC AT ALL TIMES, WITH THEIR
RELOCATION KEPT TO A MINIMUM DISTANCE. THE COST SHALL BE INCLUDED IN THE COST OF ITEMS BID. 24.74 TC FENCE - STOCKADE
4. THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR ANY DEVIATION FROM THESE PLANS UNLESS
24.24
24.24 SPOT ELEVATIONS: SURFACE
5. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LAWS, ORDINANCES, RULES, REGULATIONS AND ORDERS OF ANY PUBLIC BODY
WRITTEN APPROVAL HAS BEEN PROVIDED BY THE ENGINEER. HAVING JURISDICTION. THE CONTRACTOR SHALL ERECT AND MAINTAIN, AS REQUIRED BY THE CONDITIONS AND PROGRESS OF THE WORK,
ALL NECESSARY SAFEGUARDS FOR SAFETY AND PROTECTION. SWALE 24 CONTOUR
5. ACCORDING TO FEMA FLOOD INVENTORY MAP 10001C0166H, DATED: MAY 05, 2003, AND FEMA FLOOD INVENTORY
MAP 10001C0167H, DATED: MAY 05, 2003. THE SITE IS IN ZONE "X" - AREA OF MINIMAL FLO0DING. 6. DELAWARE REGULATIONS PROHIBIT THE BURIAL OF CONSTRUCTION DEMOLITION DEBRIS, INCLUDING TREES AND STUMPS ON 23.00 TC 23.00 TOP OF CURB
M CONSTRUCTION SITES. ANY SOLID WASTE FOUND DURING THE EXCAVATION FOR STRUCTURES AND UTILITY LINES ON AND OFF SITE MUST EDGE OF WOODS 22.50 BC SPOT ELEVATIONS: SURFACE BOTTOM OF CURB
6. THE DNREC SEDIMENT AND STORMWATER PROGRAM (OR DELEGATED AGENCY) SHALL BE NOTIFIED IN WRITING BE REMOVED AND PROPERLY DISCARDED. ANY REMEDIAL ACTION REQUIRED IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM.
FIVE (5) DAYS PRIOR TO COMMENCING WITH CONSTRUCTION. FAILURE TO DO SO CONSTITUTES A VIOLATION OF ADDITIONAL COSTS WILL BE NEGOTIATED WITH THE OWNER.
THE APPROVED SEDIMENT AND STORMWATER MANAGEMENT PLAN.
7. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF S EX-SS SANITARY SEWER - SEWER MAIN, MANHOLE, & CLEANOUT SWALE
UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY BE
7. REVIEW AND OR APPROVAL OF THE SEDIMENT AND STORMWATER MANAGEMENT PLAN SHALL NOT RELIEVE THE PERFORMED BY THE UTILITY COMPANY'S FORCES AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES.
CONTRACTOR FROM HIS OR HER RESPONSIBILITIES FOR COMPLIANCE WITH THE REQUIREMENTS OF THE THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES, PERMITS AND CHARGES. EX-W WATER SERVICE - EDGE OF WOODS
DELAWARE SEDIMENT AND STORMWATER REGULATIONS, NOR SHALL IT RELIEVE THE CONTRACTOR FROM
ERRORS OR OMISSIONS IN THE APPROVED PLAN. 8. DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. ALL WORK MUST BE DONE IN COMPLIANCE WITH
THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, AS AMENDED AND ALL RULES AND REGULATIONS THERETO APPURTENANT. D STORM SEWER - STORMDRAIN, MANHOLE, & INLET MH 8SS SANITARY SEWER - MANHOLE, CLEANOUT, & FLOW ARROW
8. IF THE APPROVED PLAN NEEDS TO BE MODIFIED, ADDITIONAL SEDIMENT AND STORMWATER CONTROL MEASURES
MAY BE REQUIRED AS DEEMED NECESSARY BY DNREC OR THE DELEGATED AGENCY. 9. PRIOR TO DEMOLITION OCCURRING, EROSION CONTROL DEVICES ARE TO BE INSTALLED AS DETAILED ON THE SEQUENCE OF
CONSTRUCTION. CURB, CURB & GUTTER 8W
WATER SERVICE - VALVE, WATER METER, & FIRE HYDRANT
L 9. FOLLOWING SOIL DISTURBANCE OR REDISTURBANCE, PERMANENT OR TEMPORARY STABILIZATION SHALL BE
COMPLETED FOR ALL PERIMETER SEDIMENT CONTROLS, SOIL STOCKPILES, AND ALL OTHER DISTURBED OR
GRADED AREAS ON THE PROJECT SITE WITHIN 14 CALENDAR DAYS UNLESS MORE RESTRICTIVE FEDERAL CONCRETE - SIDEWALK, PAD, OR PAVING STORM SEWER - MANHOLE, PIPE, & DRAINAGE INLET
REQUIREMENTS APPLY.
10. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL COMPLY WITH THE DELAWARE EROSION AND SEDIMENT FULL DEPTH PAVEMENT - LIGHT / HEAVY CURB, CURB & GUTTER
CONTROL HANDBOOK, LATEST EDITION.
BUILDING CONCRETE - SIDEWALK, PAD, OR PAVING
11. AT ANY TIME A DEWATERING OPERATION IS USED, IT SHALL BE PREVIOUSLY APPROVED BY THE AGENCY
CONSTRUCTION SITE REVIEWER FOR A NON-EROSIVE POINT OF DISCHARGE, AND A DEWATERING PERMIT SHALL
BE APPROVED BY THE DNREC WELL PERMITTING BRANCH.
TREES & BUSH - DECIDUOUS & EVERGREEN FULL DEPTH PAVEMENT - LIGHT
MT ZION AME CHURCH ADDITION
K 12. APPROVAL OF A SEDIMENT AND STORMWATER MANAGEMENT PLAN DOES NOT GRANT OR IMPLY A RIGHT TO
DISCHARGE STORMWATER RUNOFF. THE OWNER/DEVELOPER IS RESPONSIBLE FOR ACQUIRING ANY AND ALL
SIGNS & MAILBOXES FULL DEPTH PAVEMENT - HEAVY
AGREEMENTS, EASEMENTS, ETC., NECESSARY TO COMPLY WITH STATE DRAINAGE AND OTHER APPLICABLE LAWS.
13. THE CONTRACTOR SHALL AT ALL TIMES PROTECT AGAINST SEDIMENT OR DEBRIS LADEN RUNOFF OR WIND FROM BUILDING
LEAVING THE SITE. PERIMETER CONTROLS SHALL BE CHECKED DAILY AND ADJUSTED AND/OR REPAIRED TO FULLY
CONTAIN AND CONTROL SEDIMENT FROM LEAVING THE SITE. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN
IT HAS REACHED HALF OF THE EFFECTIVE CAPACITY OF THE CONTROL. IN ADDITION, THE CONTRACTOR MAY NEED TREES & BUSHES - DECIDUOUS
TO ADJUST OR ALTER MEASURES IN TIMES OF ADVERSE WEATHER CONDITIONS, OR AS DIRECTED BY THE AGENCY
CONSTRUCTION SITE REVIEWER.
TREES & BUSHES - EVERGREEN
14. BEST AVAILABLE TECHNOLOGY (BAT) SHALL BE EMPLOYED TO MANAGE TURBID DISCHARGES IN ACCORDANCE
WITH REQUIREMENTS OF 7. DEL C. CH 60, REGULATIONS GOVERNING THE CONTROL OF WATER POLLUTION,
J SECTION 9.1.02, KNOWN AS SPECIAL CONDITIONS FOR STORMWATER DISCHARGES ASSOCIATED WITH ITEMS TO BE DEMOLISHED
CONSTRUCTION ACTIVITIES, AND DNREC POLICIES, PROCEDURES, AND GUIDANCE.
KENT COUNTY, DELAWARE
15. APPROVED PLANS REMAIN VALID FOR 3 YEARS FROM THE DATE OF APPROVAL. SIGNS
16. POST CONSTRUCTION VERIFICATION DOCUMENTS ARE TO BE SUBMITTED TO THE DNREC SEDIMENT AND
SITE NOTES
CITY OF DOVER
STORMWATER PROGRAM WITHIN 60-DAYS OF STORMWATER MANAGEMENT FACILITY COMPLETION.
17. THE NOTICE OF INTENT FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER A
NPDES GENERAL PERMIT FOR THIS PROJECT IS #XXXX. AT ANY TIME THE OWNERSHIP FOR THIS PROJECT PARKING COUNT
CHANGES, A TRANSFER OF AUTHORIZATION OR A CO-PERMITTEE APPLICATION MUST BE SUBMITTED TO DNREC.
THE PERMITTEE OF RECORD SHALL NOT BE RELIEVED OF THEIR RESPONSIBILITIES UNTIL A NOTICE OF
TERMINATION HAS BEEN PROCESSED BY DNREC.
I
18. THE OWNER SHALL BE FAMILIAR WITH AND COMPLY WITH ALL ASPECTS OF THE NPDES CONSTRUCTION GENERAL
PERMIT ASSOCIATED WITH THE PROJECT, INCLUDING, BUT NOT LIMITED TO, PERFORMING WEEKLY SITE
INSPECTIONS DURING CONSTRUCTION AND AFTER RAIN EVENTS, AND MAINTAINING WRITTEN LOGS OF THESE
INSPECTIONS.
19. BEFORE ANY EARTHWORK OR EXCAVATION TAKES PLACE, THE CONTRACTOR SHALL CALL MISS UTILITY AT 811 OR
1.800.282.8555 AT LEAST 48 HOURS PRIOR TO CONSTRUCTION, TO HAVE ALL EXISTING UTILITIES MARKED ONSITE
20. DOCUMENTATION OF SOIL TESTING AND MATERIALS USED FOR TEMPORARY OR PERMANENT STABILIZATION
INCLUDING BUT NOT LIMITED TO SOIL TEST RESULTS, SEED TAGS, SOIL AMENDMENT TAGS, ETC. SHALL BE
PROVIDED TO THE DEPARTMENT OR DELEGATED AGENCY TO VERIFY THAT THE PERMANENT OR TEMPORARY
H STABILIZATION HAS BEEN COMPLETED IN ACCORDANCE WITH THE APPROVED PLAN. THE DEPARTMENT OR
DELEGATED AGENCY MAY REQUIRE ADDITIONAL SOIL TESTING AND REAPPLICATION OF PERMANENT OR
TEMPORARY STABILIZATION IN ACCORDANCE WITH SPECIFICATIONS PROVIDED IN THE DELAWARE EROSION AND
SEDIMENT CONTROL HANDBOOK, OR ALTERNATIVE MEASURES THAT PROVIDE FUNCTIONAL EQUIVALENCY.
21. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN AND REPAIR ALL EROSION, SEDIMENT
CONTROL AND STORMWATER MANAGEMENT PRACTICES DURING UTILITY INSTALLATION AND SITE CONSTRUCTION.
22. IT SHALL BE THE SOLE RESPONSIBILITY OF THE OWNER TO MAINTAIN AND REPAIR ALL EROSION, SEDIMENT
CONTROL AND STORMWATER MANAGEMENT PRACTICES AFTER COMPLETION AND APPROVAL OF ALL
STORMWATER MANAGEMENT PRACTICES.
23. TEMPORARY VEGETATIVE COVER, MULCHING AND/OR SPRINKLING WITH WATER SHALL BE THE METHODS USED AS
G NECESSARY TO CONTROL DUST.
24. STABILIZATION MATTING SHALL BE NORTH AMERICAN GREEN SC150BN OR DNREC TYPE SSM-III.
25. ALL RIPRAP SHALL BE UNDERLAIN WITH MIRAFI 600X GEOTEXTILE OR DNREC TYPE GS-1.
26. ALL STORM DRAIN PIPING, INLET, MANHOLE, AND END SECTION INSTALLATION SHALL BE IN ACCORDANCE WITH
KENT COUNTY CONSTRUCTION STANDARDS.
27. ALL STORM DRAIN DESIGNATED AS RCP IS TO BE REINFORCED CONCRETE PIPE, MEETING AASHTO M 170
SPECIFICATIONS, STORM DRAIN SEE PIPE SCHEDULE FOR PIPE CLASSIFICATION.
F 28. PIPE SPAN LENGTHS ARE MEASURED FROM C/L OF STRUCTURE TO C/L OF STRUCTURE, WHERE APPLICABLE ARE
ROUNDED TO THE NEAREST FOOT.
29. ALL SEALS MUST BE WATERTIGHT WITH NON SHRINK GROUT OR RUBBER GASKETS AND CONCRETE STRUCTURES
MUST BE PRECAST OR POURED IN PLACE.
30. CONTRACTOR SHALL GRADE, TOPSOIL, SEED AND MULCH ALL DISTURBED AREAS OF CONSTRUCTION, INCLUDING
PIPE INSTALLATION OR DITCH CONSTRUCTION. EROSION CONTROL MATTING SHALL BE PROVIDED ON ALL SLOPES
GREATER THAN 3:1.
31. THE CONTRACTOR SHALL PROVIDE SEDIMENT CONTROL MEASURES TO PROTECT STOCKPILE AREAS AND
STORAGE AREAS. ALL AREAS USED BY THE CONTRACTOR FOR STAGING OPERATIONS SHALL BE FULLY RESTORED
BY THE CONTRACTOR UPON COMPLETION OF THE PROJECT. IF THE STAGING AREA IS PAVED, IT SHALL BE
E RESTORED TO ITS ORIGINAL CONDITION. IF THE STAGING AREA IS UNPAVED, IT SHALL BE RE-GRADED, TOPSOILED,
SEEDED AND MULCHED TO THE SATISFACTION OF THE ENGINEER. ALL COSTS ASSOCIATED WITH RESTORATION OF
THE STAGING AREA SHALL BE AT THE CONTRACTOR'S EXPENSE. IF THE ENGINEER DETERMINES THAT A
SATISFACTORY STAND OF GRASS DOES NOT EXIST AT THE TIME OF FINAL INSPECTION, ALL COSTS ASSOCIATED
WITH RE-ESTABLISHING A SATISFACTORY STAND OF GRASS SHALL BE AT THE CONTRACTOR'S EXPENSE.
32. EQUIPMENT AND/OR STOCKPILE MATERIAL SHALL NOT BE STORED IN THE DRIPLINE AREA OF ANY TREE.
33. IF THE APPROVED PLAN NEEDS TO BE MODIFIED, ADDITIONAL SEDIMENT AND STORMWATER CONTROL MEASURES
MAY BE REQUIRED AS DEEMED NECESSARY BY THE KENT CONSERVATION DISTRICT.
34. STABILIZATION MATTING SHALL BE NORTH AMERICAN GREEN SC150BN OR APPROVED EQUIVALENT.
D
P:\4335\4335a001-mt zion ame church\CAD\SHEET\PRELIM\4335A001-C-001-TITLE.dwg Oct 06 , 2023 - 9:02am PERY
Date:
C
JUNE 2023
Scale:
AS SHOWN
Dwn.By:
YAP
Proj.No.:
4335A001
B
LEGEND &
NOTES
A
Dwg.No.:
C-002
176
THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2023
Página 177
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Item 5.
EX-R/W
O
Professional Certification. I hereby certify that
EX-R/W
these documents were prepared or approved by
me, and that I am a duly licensed Professional
Engineer, in the laws of the State of Delaware
License No. 12734 Expiration Date: 06-30-24
N
EX-R/W
M
PE PE PE PE PE PE PE PE PE PE PE
L
R/W
MT ZION AME CHURCH ADDITION
K
R/W
PE PE PE PE PE PE PE PE PE PE PE
J
KENT COUNTY, DELAWARE
CITY OF DOVER
R/W
I
R/W
H
R/W
G
R/W R/W R/W R/W R/W R/W R/W R/W R/W EX-R/W EX-R/W EX-R/W EX-R/W
F
E
EXISTING CONDITIONS
SCALE: 1" = 10" HORIZ.
D
P:\4335\4335a001-mt zion ame church\CAD\SHEET\PRELIM\4335A001-C-051-TOPO.dwg Oct 06 , 2023 - 9:02am PERY
Date:
C
JUNE 2023
Scale:
1" = 10'
Dwn.By:
YAP
Proj.No.:
ANE 4335A001
TAT
E PL
B D 83
83 S NGV
EXISTING
NAD
CONDITONS
A
Dwg.No.:
0'
SCALE: 1" = 10'
10' 20' 30'
C-051
177
THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2023
Página 178
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Item 5.
EX-R/W DEMO KEY NOTES
REMOVE EXTERIOR FITTINGS FROM BUILDING
O
REMOVE SIDEWALK / CONCRETE PAD, FULL DEPTH
EXISTING BRICK STAIRS TO BE REMOVED / RELOCATED
EXISTING BRICK PORCH TO BE REMOVED
EXISTING HVAC EQUIPMENT TO BE REMOVED / RELOCATED Professional Certification. I hereby certify that
EX-R/W
these documents were prepared or approved by
me, and that I am a duly licensed Professional
EXISTING LANDSCAPE BED TO BE REMOVED / RELOCATED Engineer, in the laws of the State of Delaware
License No. 12734 Expiration Date: 06-30-24
REMOVE UTILITY / LIGHT POLES
N
LEGEND
BUILDING TO BE
REMOVED / RELOCATED
EX-R/W
SIDEWALK/CONCRETE PADS
M TO BE REMOVED
LANDSCAPE FEATURES TO BE
REMOVED / RELOCATED
MISCELLANEOUS ITEMS
TO BE REMOVED
PE PE PE PE PE PE PE PE PE PE PE
L
R/W
MT ZION AME CHURCH ADDITION
K
R/W
PE PE PE PE PE PE PE PE PE PE PE
J
KENT COUNTY, DELAWARE
CITY OF DOVER
R/W
I
R/W
H
R/W
G
R/W R/W R/W R/W R/W R/W R/W R/W R/W EX-R/W EX-R/W EX-R/W EX-R/W
F
E
DEMOLITION PLAN
SCALE: 1" = 10" HORIZ.
D
P:\4335\4335a001-mt zion ame church\CAD\SHEET\PRELIM\4335A001-C-051-TOPO.dwg Oct 06 , 2023 - 9:02am PERY
Date:
C
JUNE 2023
Scale:
1" = 10'
Dwn.By:
YAP
Proj.No.:
ANE 4335A001
TAT
E PL
B D 83
83 S NGV PRELIMINARY
NAD DEMOLITION
PLAN
A
Dwg.No.:
0'
SCALE: 1" = 10'
10' 20' 30'
C-052
178
THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2023
Página 179
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Item 5.
EX-R/W SITE KEY NOTES
CONCRETE SIDEWALK
O
6" WOOD POST, TYP.
WOOD HANDICAP RAMP, TYP.
LANDSCAPE BEDDING, TYP.
6' HEIGHT, WOOD RAMP, W/ RAILINGS Professional Certification. I hereby certify that
EX-R/W
these documents were prepared or approved by
me, and that I am a duly licensed Professional
BRICK PLANTER Engineer, in the laws of the State of Delaware
License No. 12734 Expiration Date: 06-30-24
RELOCATED MONUMENT
N
PAVEMENT LEGEND
EX-R/W CONCRETE SIDEWALK, PAD OR PAVING
M
REINFORCED TURF
PE PE PE PE PE PE PE PE PE PE PE
33.52 33.52 35.00 35.00
L
10.2' 9.5'
35.00
33.52
R/W 33.52 35.00
MT ZION AME CHURCH ADDITION
K
PROPOSED ADDITION
1,402 S.F.
36.53 F.F.
31.99 36.53
R/W
31.99 36.53
31.96
31.85 EXISTING WALL SHOWN
AS REFERENCE
PE PE PE PE PE PE PE PE PE PE PE
J
KENT COUNTY, DELAWARE
32.11 32.01
CITY OF DOVER
R/W
I
R/W
H
R/W
G
R/W R/W R/W R/W R/W R/W R/W R/W R/W EX-R/W EX-R/W EX-R/W EX-R/W
F
E
SITE & GRADING PLAN
SCALE: 1" = 10" HORIZ.
D
P:\4335\4335a001-mt zion ame church\CAD\SHEET\PRELIM\4335A001-C-101-SITE.dwg Oct 06 , 2023 - 9:02am PERY
Date:
C
JUNE 2023
Scale:
1" = 10'
Dwn.By:
YAP
Proj.No.:
ANE 4335A001
TAT
E PL
B D 83
PRELIMINARY
83 S NGV
SITE &
NAD
GRADING
PLAN
A
Dwg.No.:
0'
SCALE: 1" = 10'
10' 20' 30'
C-101
179
THIS DRAWING, THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE PROPRIETARY TO DAVIS, BOWEN & FRIEDEL, INC., AND SHALL NOT BE ALTERED OR REUSED WITHOUT WRITTEN PERMISSION. COPYRIGHT © 2023
Página 183
Item 6.
City of Dover
DATA SHEET FOR SITE DEVELOPMENT PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF November 8, 2023
PLANNING COMMISSION MEETING November 20, 2023
Plan Title: Cold Storage Warehouse at 451 Garrison Oak Drive
Garrison Oak Business & Technology Center – Lot 8
S-23-20
Plan Type: Site Development Plan
Associated Application: Variance Application V-23-05 (Approved by Board of Adjustment)
Property Owner: City of Dover
Applicants/ Equitable Owner: SLS Equity Partners
Location: South side of Garrison Oak Drive
Address: 451 Garrison Oak Drive
Tax Parcel: LC-05-068.00-02-08.00-000
Site Area: Lot 8: 11.53 acres +/-
Zoning: IPM-2 (Industrial Park/Manufacturing Technology Center)
SWPOZ (Source Water Protection Overlay Zone): Tier 2 Primary Wellhead
Protection Area
Present Use: Vacant
Proposed Use: Warehouse
Sanitary Facilities: City of Dover
Water Supply: City of Dover
Waivers Requested: Partial Elimination of Upright Curbing
Reduction of Parking Requirement
For Consideration: Performance Standards Review Application
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service 183
Página 184
City of Item 6.
Dover
CITY OF DOVER Planning
Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: November 8, 2023
APPLICATION: Cold Storage Warehouse at 451 Garrison Oak Drive, Lot 8 Garrison Oak
Business & Technology Park
FILE #: S-23-20 REVIEWING AGENCY: City of Dover Planning Office
CONTACT PERSON: Dawn Melson-Williams, AICP PHONE #: 302.736.7196
I. PLAN SUMMARY
This is a Site Development Plan to permit construction of a 165,000 SF Cold Storage Warehouse
with associated site improvements. The site is located at Lot 8 of the Garrison Oak Business &
Technology Center. The property is zoned IPM-2 (Industrial Park Manufacturing Zone –
Business and Technology Center) and partially subject to the SWPOZ (Source Water Protection
Overlay Zone: Tier 2 Primary Wellhead Protection Area). The property of 11.53 acres is located
on the south side Garrison Oak Drive. The owner of record is the City of Dover; and the
equitable owner is SLS Equity Partners. Property Address: 451 Garrison Oak Drive. Tax Parcel:
LC-05-068.00-02-08.00-000. Council District 3.
Garrison Oak Business & Technology Center (Garrison Oak Technical Park)
The Subdivision Plan to layout the lots, street network, and other infrastructure was reviewed as
the Garrison Oak Technical Park (Application SB-09-06) to establish fifteen (15) individual lots
and residual open space from two parcels totaling 381.84 acres +/- on a tract known as Garrison
Oak. The Planning Commission reviewed and granted conditional approval of this proposed
Subdivision Plan for the Technical Park in January 2010 and September 2010 with the Record
Plan recorded in May 2012. Construction of infrastructure and the road network of Garrison Oak
Drive then commenced.
Within the Garrison Oak Business & Technology Center (previously known as the Garrison Oak
Technical Park), several lots have already been developed through the Site Development Plan
review process. Application S-10-01 completed the subdivision of Lot #15 and its development
as the Dover Sun Park. A Site Development Master Plan application (S-12-03) and Performance
Standards Review Application (MI-12-21) along with an Administrative Site Plan (S-12-17
Phase 1) approved in September 2013 was for Calpine’s development of Lot #7 as the Garrison
Energy Center. Site Plan S-13-20 outlined the development of Lot #12 for the Uzin Utz
Manufacturing N.A.; this dry mortar plant facility consisting of an office building, warehouse,
and production building opened for operation in 2015. Site Plan S-16-24 was for the
development of Advantech as office with the light manufacturing facility on Lot #13. Site Plan
S-23-09 Byler’s Warehouse was recently approved for the development of Lot #2 with a
warehouse building.
184
Página 185
Item 6.
S-23-20 Cold Storage Warehouse at Garrison Oak Drive on Lot #8 Garrison Oak Business & Technology Center
DAC Report of November 8, 2023
Page 3 of 11
Preliminary Land Use Services Review (PLUS)
The Garrison Oak Technical Park Subdivision Plan application was reviewed on November 25,
2009 by the Preliminary Land Use Services as required by the City of Dover’s Memorandum of
Understanding (MOU). This MOU requires certain types of applications (i.e. non-residential
developments of over 75,000 square feet) or specific project locations complete the PLUS Review
process prior to application submission. For this specific development of GOBTC Lot 8, the size
of the proposed building would have required PLUS Review per the MOU; however, a PLUS
Review Waiver has been granted based on its importance as an economic development project
and as per the waiver process established by House Bill 104 (29 Del. C. §9202 and §9203). See
Letter dated October 16, 2023 from the Office of State Planning Coordination granting the
waiver.
II. PROJECT DESCRIPTION
The Site Development Plan proposes the construction of a Warehouse for bulk cold storage as a
165,000 SF building. The design of the site appears to maximize the building size while also
providing on-site circulation, fire lane coverage, and space for on-site maneuverability of trucks
for loading activities. The Warehouse Building includes a series of truck dock bays on the south
elevation with additional truck and trailer parking for the functions of this distribution facility. A
portion of the building includes an office area with the car parking lot area on the east side of the
building. The southwestern edge of the site is partially impacted by the floodplain and the
southeastern portion of the site will focus on stormwater management areas. The site will be
subject to a Performance Standards Review Application to ensure the proposed use complies
with Zoning Regulations.
Previous Application
The site was granted two variances by the Board of Adjustment on October 18, 2023 to reduce
setbacks related to building height and to increase the maximum lot coverage to 71%
(Application V-23-05). The first Variance request was to reduce the setbacks as it relates to
building height by allowing a portion of the building to be up to 100 feet in height when setback
88 feet (front yard) or 60 feet (side yard) from the property lines. The second Variance request
allows an increase in the maximum lot coverage from 65% to 71% for the property.
Surrounding Properties
With its location within the Garrison Oak Business & Technology Center, this property is
adjacent to other undeveloped lots in the Park that are also zoned IPM-2. The neighboring
parcels are not yet developed include Lot #9 adjacent on the west and Lots #5 and 6 to the east
across Garrison Oak Drive. To the north, there are the solar field (Lot #15) and the energy
generation facility (Lot #7) already existing to the north across Garrison Oak Drive. Along the
subject parcel’s southern property line is a tract owned by the City of Dover zoned ROS
(Recreational and Open Space Zone). It serves as an open space area within the overall GOBTC
with tree plantings and also protects a Special Flood Hazard Area (100-year floodplain) and
drainage system in the area. On the next lot (Lot #3) to the south includes the placement of a City
of Dover Water Tower.
III. ZONING REVIEW
IPM-2 (Industrial Park Manufacturing Zone – Business & Technology Center)
Zoning Ordinance, Article 3 Section 20A lists the permitted uses, conditional uses, and other
provisions of the IPM-2 (Industrial Park Manufacturing Zone – Business and Technology
Center) zone. In Article 3 Section 20A.16, it notes for the IPM-2 zone that the proposed use of a
185
Página 186
Item 6.
S-23-20 Cold Storage Warehouse at Garrison Oak Drive on Lot #8 Garrison Oak Business & Technology Center
DAC Report of November 8, 2023
Page 4 of 11
warehouse building as a bulk cold storage and distribution building is allowable as a type of
“Warehousing, transshipment and distribution, and logistics support and trucking terminals.”
SWPOZ – Source Water Protection Overlay Zone, Tier 2: Primary Wellhead Protection Area
The purpose of the Source Water Protection Overlay Zone (Zoning Ordinance Article 3 §29) is
to provide a safe drinking water supply and to ensure that groundwater is adequately protected
and maintained. This the eastern portion of the site is subject to the Tier 2: Primary Wellhead
Protection Area.
The following uses listed below are prohibited throughout the SWPOZ, including in the Tier 2
area. The proposed use as a warehouse would be allowed.
Zoning Ordinance Article 3 Section 29
29.51 Uses prohibited:
a) Automobile body/repair shop, motor vehicle, boat or farm equipment service;
b) Gas stations and motor vehicle service stations;
c) Fleet/trucking/bus terminal;
d) Dry cleaner;
e) Electrical/electronic manufacturing facility;
f) Machine shop;
g) Metal plating/finishing/fabricating facility;
h) Chemical processing/storage facility;
i) Wood preserving/treating facility;
j) Junk yard/scrap yard/salvage yard;
k) Mines/gravel pit;
l) Land divisions resulting in high density (> one unit/acre) septic systems;
m) Equipment maintenance/fueling areas;
n) Injection wells/dry wells/sumps, except for single-family residences directing
gutter downspouts to a drywell;
o) Underground storage tanks;
p) All uses not permitted in the underlying zone district.
Tier 2 - Primary Wellhead Protection Area Lands are additionally subject to specific rules for
protection of potable water supply well fields. Specific requirements are for areas immediately
surrounding the actual wellhead location; there is not a wellhead on or within 500 feet of this
property. There are provisions related to management of stormwater runoff and its discharge
requiring use of sheet flow through grassland areas and certain construction features of
stormwater management facilities. This will be reviewed as part of the Stormwater Management
Plan by the Kent Conservation District.
IV. PARKING SUMMARY
The parking requirement in the IPM-2 zoning district is one space per 800 S.F. of floor area or
one space per employee of the largest shift. The floor area of 165,000 S.F. for the total facility
would require a minimum of 207 parking spaces. The plan shows a parking lot of 118 parking
spaces for (passenger) vehicles. However, the additional truck parking area (not at the loading
dock) would allow for more parking functionally related to building operations for staging of
trucks on-site. It is noted that the paved width of Garrison Oak Drive does not accommodate on-
street parking.
Waiver Request: Reduction of Parking Requirement (Number of Parking Spaces)
The Zoning Ordinance, Article 6 Section 3.9 allows the Planning Commission to consider
adjustments to parking requirements. The Planning Commission in granting a parking reduction can
186
Página 187
Item 6.
S-23-20 Cold Storage Warehouse at Garrison Oak Drive on Lot #8 Garrison Oak Business & Technology Center
DAC Report of November 8, 2023
Page 5 of 11
require that an area of open space be designated where parking could be constructed. The
applicant’s written request seeks a 50% reduction outlining a request to reduce the due to expected
operational needs of the facility based on function and staffing. The Request described a proposal
for 104 parking spaces. See attached Waiver Request.
Loading Spaces
The requirement for loading spaces in the IPM-2 zone is based on building square footage of the
specific uses. However, the number of required loading spaces for buildings in excess of 150,000
square feet is not specified and the applicant is to provide sufficient off-street loading berths for
the operations. Planning Staff is to evaluate the sufficiency of the loading area proposed. This
plan shows a loading dock with 33 truck dock bays on the south side of the building to satisfy
this requirement. Additionally, there are a series of 24 parking spaces for truck/trailer parking.
The loading dock area and truck parking area of the site is enclosed by fencing.
Bicycle Parking
The site is required to provide bicycle parking. The bicycle parking calculation is one for every
twenty parking spaces. Based on the number of parking spaces, six (6) bicycle parking spaces
are required.
V. BUILDING ARCHITECTURE
The proposed Cold Storage Warehouse facility is a building with a tall one story section as
warehousing with a corner section proposed as office area. The area adjacent to the loading dock
area is shorter in height. The building is predominately clad in a vertical metal insulated siding
panel system in a white color. There is some concern that the size of the building will result in
large expanses of blank walls unless detailing in material or form is implemented. The building
has a flat low sloping roof system. The office (corner) area includes a greater variety of exterior
finishes including the use of aluminum windows systems, metal wall panels, and metal canopy.
The facility must comply with the maximum height limitations of the IPM-2 zoning district. For
this zoning district, the maximum height is limited to distance of the element from the nearest
property line. The project has received a variance regarding this height vs. distance to property
line requirement. The tallest portion of the building is proposed at 100 feet to accommodate the
cold storage facility. The building placement is within the buildable area established by the front
yard setback of 60 feet and side yard and rear yard setbacks of 40 feet.
VI. SITE CONSIDERATIONS
Lot Coverage
The IPM-2 zone has a maximum lot coverage (impervious coverage) of 65%; however, the
project has received a variance to allow up to 71% lot coverage. Currently, the overall GOTBC
has a regional stormwater management system to account for 65% lot coverage. This project will
need to manage that increase in lot coverage (the difference of 6%).
Access
The site has two access/egress points to Garrison Oak Drive via an entrance drive aisle located
on the west end of the building and also from the east side of the building. This entrance drive
fully encircles the building serving as a fire lane on the north elevation and west elevation and
leading to the truck dock and parking on the south and a vehicle parking lot on the east.
187
Página 188
Item 6.
S-23-20 Cold Storage Warehouse at Garrison Oak Drive on Lot #8 Garrison Oak Business & Technology Center
DAC Report of November 8, 2023
Page 6 of 11
Lighting
The lighting internal to the site is shown along the entrance drives and within the parking lot and
the loading/ truck parking areas.
Dumpster
For industrial and warehousing uses, two Dumpsters are required for 80,000 SF of gross floor
area and one for each additional 40,000 SF or fraction thereof. For this project with a building of
165,000 S.F. the requirement is for five Dumpsters. The plan does not indicate a location
serving as a Dumpster area.
Sidewalk
Sidewalk is required along all City street frontages and within the site in accordance with Zoning
Ordinance, Article 5 §18. As part of the Garrison Oak Technical Park subdivision, a sidewalk
was constructed along the frontage of Lot #8 with Garrison Oak Drive in accordance with the
subdivision plan for the Park. In addition, sidewalks are shown connecting from the street
frontage sidewalk into the site and for pedestrian access from parking areas to building
entrances.
Curbing
Waiver Requested: Partial Elimination of Curbing
The Zoning Ordinance, Article 6 §3.6(b) requires upright curbing for all parking areas and access
drives. The plan does not include curbing for portions of the east edge of the vehicle parking lot
and along the north side of the north fire lane and east side of the west fire lane. A written waiver
request for the elimination of curbing in these areas was submitted to the Planning Office for
consideration by the City Planner citing the reasons for the request related to drainage related to
stormwater management.
VII. SPECIAL FLOOD HAZARD AREAS
Flood Hazard Area
Portions of the subject property are within the Special Flood Hazard Area (100-year floodplain/
1% chance of annual of flooding). This property is found on the FEMA FIRM Panels of Kent
County Delaware Map Number 10001C0167H effective 5/5/2003 and 10001C0186J effective
date July 7, 2014. A Letter of Map Revision, LOMR #17-03-0901P effective June 4, 2018,
identifies the site areas within the 100-year floodplain (Zone AE). The LOMR to refine the
floodplain location was completed as part of the development activities for the overall Garrison
Oak Technical Park where there were drainage improvements to the nearby Little River/White
Oak Tax Ditch system located within the flood plain area.
The Zoning Ordinance, Article 5 §11.21 requires that flood hazard areas (100-year floodplain)
remain as open natural areas with no impervious surfaces. The select areas on the along the
southern area of this tract of land where the Special Flood Hazard Area is found will remain as
the natural area with tree plantings outside of the proposed development area.
VIII. TREE PLANTING AND LANDSCAPE PLAN
The tree planting requirement is based on the development area with one (1) tree required per
3000 SF of development area. For this project on Lot #8, the Development Area consisting of
the entire property at 11.53 acres (~502,246.8 SF) requires 168 trees. The Landscape Plan shows
a concept for a total of 172 trees as a mix of canopy trees and evergreen trees. A line of new
188
Página 189
Item 6.
S-23-20 Cold Storage Warehouse at Garrison Oak Drive on Lot #8 Garrison Oak Business & Technology Center
DAC Report of November 8, 2023
Page 7 of 11
trees is proposed along the north frontage of the site along the entrance drive/ fire lane and then
along the southern property line. Othe trees are found in parking lot islands and select areas near
the building. The construction of Garrison Oak Drive included the planting of street trees; the
existing street tree plantings will need to be evaluated to determine if any are displaced by the
site entrance placement.
IX. PERFORMANCE STANDARDS REVIEW
Uses in the IPM-2 (Industrial Park Manufacturing zone – Technology Center) are subject to the
performance standards summarized in Zoning Ordinance, Article 5 §8.1 and as more specifically
outlined in Article 5 §8.5.
Article 5 §8.1 Dangerous and objectionable elements. No land or building in any zone shall
be used or occupied in any manner so as to cause any one or more of the following
conditions to exist and to be dangerous, injurious, noxious or offensive beyond the
boundaries of such premises in such a manner or in such amount as to adversely affect the
reasonable use of the surrounding area or adjoining premises: Fire, explosive or other
hazard; noise, or vibration; smoke, dust, odor or other form of air pollution; heat, cold,
dampness or electromagnetic disturbance; glare, liquid or solid refuse or waste; traffic
congestion causing roadways or intersections in the surrounding highway network to fall
below acceptable levels of comfort and convenience; or other substance, condition or
element (referred to hereinafter as "dangerous or objectionable elements"), provided that any
use permitted or not expressly prohibited by this ordinance may be undertaken and
maintained if it conforms to the regulations of this section limiting dangerous and
objectionable elements at the point of the determination of their existence.
The project’s compliance with a series of performance standards for the “dangerous and
objectionable elements” are to be considered by the Planning Commission. The “dangerous and
objectionable elements” are as follows:
• Fire and explosion hazards (activities with and storage of)
• Radioactivity or electromagnetic disturbance
• Noise (sound pressure level)
• Vibration
• Smoke
• Odors (Odorous gases or odorous matter)
• Fly ash, dust, fumes, vapors, gases, and other forms of air pollution
• Glare (from lighting or high temperature processes)
• Liquid or solid wastes
• Traffic congestion (Level of Service E)
The project cannot cause the above conditions to exist so that they adversely affect the
surrounding areas or adjoining properties. The specific limits of each performance standard are
described in the Zoning Ordinance. Where the performance standards conflict with regulations
established by other state or local agencies such as the Delaware Department of Natural
Resources and Environmental Control (DNREC), the more restrictive regulations apply.
As part of this procedure, a Performance Standard Review Application is required to accompany
this Plan submission for review and approval. The Applicant has submitted a Performance
189
Página 190
Item 6.
S-23-20 Cold Storage Warehouse at Garrison Oak Drive on Lot #8 Garrison Oak Business & Technology Center
DAC Report of November 8, 2023
Page 8 of 11
Standard Review Application Letter indicating how the proposed development would restrict the
emission of dangerous and objectionable elements detailed in Article 5, Section 8.5.
VIII. CITY AND STATE CODE REQUIREMENTS:
The subject proposal has been reviewed for code compliance, plan conformity, and completeness
in accordance with the agency’s authority and area of expertise. The following items have been
identified as elements which need to be addressed by the applicant:
1) Review and Approval of the Performance Standards Review Application is required for the
property development in accordance with Zoning Ordinance, Article 5 §8. The applicant has
submitted a Performance Standard Review Application Letter indicating how the proposed
development would restrict the emission of dangerous and objectionable elements detailed in
Zoning Ordinance, Article 5, Section 8.5.
2) Upright curbing must be provided around all parking areas and circulation drives unless a
waiver is granted by the City Planner. A waiver request was submitted to the Planning Office
for consideration.
3) The Planning Commission will consider the Waiver Request for a reduction in the parking
requirement. Site redesign could be required depending on the outcome of this Waiver
Request.
3) Sheet C-001, Cover Sheet and Overall Layout:
a) General Notes:
i) Note #3: Fully listing the FEMA FIRM Panels in addition to LOMR.
ii) Note #17: Update statement to apply to this project proposal.
iii) Note #18 and #19: Update with action taken on variances and include Application V-
23-05.
iv) Update references to Department of Public Works and Department of Water &
Wastewater.
b) Update label for Lot #7 for ownership to be the City of Dover unless land transaction is
complete. Also, on other sheets.
c) The zoning of the adjacent parcel to the south (Parcel 17.00) is zoned ROS. Also, on
other sheets.
d) Site Data Column:
i) Item #5: List SWPOZ (Source Water Protection Overlay Zone): Tier 2.
ii) Item #13 and #14: Update zoning district name. IPM-2 (Industrial Park
Manufacturing Zone – Business and Technology Center).
iii) Item #12: List coverage as a percentage.
iv) Item #19: Check provider for source of Electric.
v) Complete Items #23 and #24.
4) Sheet C-101, Boundary & Existing Conditions Plan:
a) Identify any street trees that will be impacted by the new entrance locations.
5) Sheet C-201 Preliminary Site & Utility Plan:
a) Identify location of bicycle parking.
b) Ensure fence location does not impact Special Flood Hazard Area (floodplain).
190
Página 191
Item 6.
S-23-20 Cold Storage Warehouse at Garrison Oak Drive on Lot #8 Garrison Oak Business & Technology Center
DAC Report of November 8, 2023
Page 9 of 11
c) Identify distance from parking space to building and fire lane to building.
d) Clarify outfall from stormwater management facility.
e) Ensure accessible ramps are provided from handicapped spaces onto sidewalk system and
also at points of intersection of sidewalk with parking lot.
f) The proposed sign placements are the entrances are subject to separate Sign Permits.
Check distance from property line for compliance.
g) Identify use of concreate pad near east gate entrance.
h) The Notes listed on the plan do not include the reference labels on the plan drawing. Plan
Set will also need to include Sheet C-901 for the details.
i) Identify the location and format of the Dumpsters.
6) Sheet L-101 Landscape Plan:
a) Check tree placement for utility conflicts and relocate as necessary to maintain adequate
separation distances. There appears to be conflicts with stormwater drainage piping.
b) Show the existing street trees along Garrison Oak Drive and confirm if any trees need to
be relocated/ replanted due to removal for the entrance construction.
7) Please provide one or more detail sheets depicting required site details, including but not
limited to bike racks, Dumpsters, traffic control signage, stormwater, and utility details, etc.
8) The Site Plan set will need to be updated with any changes recommended or approvals
including information on any waivers granted by the Planning Commission.
9) The proposed sign locations shown on this plan sheet are for informational purposes only and
approval of this plan does not grant approval to this signage. Additional review is required to
evaluate compliance with the Sign Regulations of the Zoning Ordinance; this freestanding
monument style sign is limited in height and size and distance to property line based on the
type of road the property fronts.
10) Any Sediment & Stormwater Management Plans granted approval by the Kent Conservation
District must reflect the Site Plan layout and design conditionally approved by the Planning
Commission and be in compliance with the Zoning Ordinance and technical review
requirements of other agencies.
X. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET
CODE OBJECTIVES:
In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in
considering and acting upon Site Development Plans may prescribe appropriate conditions and
safeguards so that the public health, safety, and welfare, the comfort and convenience of the
public in general, and the residents of the immediate neighborhood in particular shall be taken
into consideration. These safeguards may to the maximum extent possible further the expressed
intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed
in subsections 2.21 to 2.28.
1) Recommendation on Waiver Requests:
a. Waiver Request for Elimination of Upright Curbing: Planning Staff grants
approval of the elimination of upright curbing for select areas of the drive
191
Página 192
Item 6.
S-23-20 Cold Storage Warehouse at Garrison Oak Drive on Lot #8 Garrison Oak Business & Technology Center
DAC Report of November 8, 2023
Page 10 of 11
aisle/fire lanes and the parking lot. In these areas, the plan is looking to implement
certain approaches for stormwater management (sheet flow) at the site. In
locations where curbing is to be removed at the head of a parking space, then a
parking bumper should be implemented.
b. Waiver Request -Reduction of Parking Requirement: Planning Staff recommends
approval of the Waiver Request for the reduction in Parking Requirements based
on the expected operations of the building. A majority of the building floor area is
warehouse space where the number of employees is likely limited and will not
generate parking needs.
2) Consideration of Performance Standards Review Application: Planning Staff has
reviewed the Performance Standards Review Letter submitted and finds that it
sufficiently demonstrates the intent to comply with the restrictions as provided in Zoning
Ordinance, Article 5 Section 8.1 and 8.2 and that the intended use of the building as a
warehouse with distribution activities is not likely to cause these objectionable elements.
3) Building Architecture: Planning Staff notes a potential concern with large expanses of
blank walls on the proposed building. Please clarify the form of the wall surface and any
detailing by material and/or color that may animate the wall.
4) Electric Vehicle: Planning Staff encourages this project to include the installation of
Electric Vehicle Charging Stations in its parking lots/parking areas. Currently, the Zoning
Ordinance does not require them, but many other jurisdictions have implemented such
requirements. Electric Vehicle Charging Stations formats include EV-Capable, EV-
Ready, and EV-Installed.
Other agencies may recommend additional considerations to meet code objectives in accordance
with their areas of expertise. Action on all considerations identified in this section is at the
discretion of the Planning Commission.
ADVISORY COMMENTS TO THE APPLICANT:
1) The Planning Commission should act upon the request for waivers as part of any motion
regarding this project application, or as a separate motion as necessary. Note: All waivers
are at the discretion of the Planning Commission. The Commission may approve or deny
waiver requests.
2) In the event, that major changes and revisions to the Site Development Plan occur in the
finalization of the Plan contact the Planning Office. Examples include reorientation of
the complex/building, relocation of site components like stormwater management areas,
and increases in floor area count. These changes may require resubmittal for review by
the Development Advisory Committee, Planning Commission, or other agencies and
commissions making recommendations in regards to the plan.
3) Following Planning Commission approval of the Site Plan, the Plan must be revised to
meet all conditions of approval from the Development Advisory Committee or as
otherwise noted. A Check Print must be submitted for review by Planning Office Staff
and the other commenting agencies. Upon determination that the Plan is complete and all
192
Página 193
Item 6.
S-23-20 Cold Storage Warehouse at Garrison Oak Drive on Lot #8 Garrison Oak Business & Technology Center
DAC Report of November 8, 2023
Page 11 of 11
agency approvals have been received, copies of the Plan may be submitted for final
endorsement (Final Plan Approval).
4) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
5) The applicant/developer shall be aware that prior to any ground disturbing activities on
the site the appropriate site inspections, Pre-Construction meeting and permits/licenses
are required.
6) Construction may have an effect on the nearby properties and the travel lanes of Garrison
Oak Drive. Any work requiring the closing or rerouting of visitors to other properties
served by this road should be coordinated as to offer the least amount of inconvenience.
7) For building new construction, the requirements of the building code and the fire code
must be complied with. Consult with the Chief Building Inspector and City of Dover Fire
Marshal for these requirements. The resolution of these items may impact the site design
including such items as building dimensions and height, building openings, and fire
protection needs, etc.
8) Noting the proposed building height, Planning Staff reminds the applicant of
compliance needs with all applicable Federal Aviation Administration, State, and other
associated aeronautics related height restrictions, obstruction marking and lighting
standards for during construction and for the actual building.
9) The applicant shall be aware that Site Plan approval does not represent a Sign Permit, nor
does it convey permission to place any sign on the premises. Any proposed site or
building identification sign shall require a Sign Permit from the City of Dover prior to
placement of any such sign. It is recommended that the applicant discuss the sign
regulation requirements with the Planning Staff prior to applying for a Sign Permit.
10) The applicant shall be aware that Site Plan approval does not represent a Building Permit
and associated construction activity permits. A separate application process is required
for issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
193
Página 194
Item 6.
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: NOVEMBER 1, 2023
Revised
APPLICATION: Cold Storage Warehouse at 451 Garrison Oak Drive
FILE #: S-23-20
REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater
CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services
CONTACT PHONE #: 302-736-7025
CONTACT PHONE #: jlyon@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
SANITATION
1. The proposed plan will require private trash collection services.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from
Kent Conservation District is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert
elevations must be labeled on all stormwater structures.
STREETS
1. Final site plan approval will not be granted until a letter of no objection, signed by DelDOT is submitted to our office.
2. Please add the following notes to the plans:
a. Standard City of Dover sidewalk, as per chapter 98, article IV of the Dover Code of Ordinances, shall be required to be
installed along the entire public street frontage of a property. Where frontage sidewalk exists but does not meet the
standards of chapter 98, article IV, the sidewalk shall be re-laid to meet the standards. Sidewalk shall include barrier-free
access ramping at points of intersection with street crossings and at other locations so as to afford reasonable barrier-free
pedestrian movement and site access.
b. In accordance to Appendix A, Article VI, Section B.3, all sidewalks shall ascend from the curbstone to the building line at the
ratio of one-quarter of an inch to the foot. Nothing in this section shall be construed to affect any pavement previously laid
by order of the city council, until it is taken up and relaid.
3. Prior to construction occurring, a right-of-way permit will need to be submitted to our office for review and approval.
WATER
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010.
Please contact our office for more information.
194
Página 195
Item 6.
Cold Storage Warehouse at 451 Garrison Oak Drive
File #: S-23-20
November 1, 2023
Page 2 of 4
2. The following notes must be added to the plans:
a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance
with the City of Dover Department of Water & Wastewater specifications and requirements.
c. The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736-
7025 prior to the start of construction. A representative from the City of Dover Department of Water & Wastewater must
observe and approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted in the field
due to conditions of the existing main. Possible conditions that would require tapping relocation include proximity to pipe
joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes must be performed by the
contractor to determine the best tapping location. The City of Dover will not be held responsible for field conditions requiring
adjustment of the tapping location or for any work required by the contractor to make an appropriate and lawful connection.
3. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan. Please be advised that
effective May 1, 2022, water mains can now be constructed using C900 PVC pipe.
4. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine the size of
the domestic and irrigation (if applicable) water meter for the proposed building. These projections must be submitted prior to
approval so the meter size can be placed on the final site plan. The proposed water meter must be installed in a pit per City of
Dover requirements and manufacturer’s recommendations. Also, a dual check valve is required downstream of the meter.
5. The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be installed at the
tee to isolate combined fire and domestic water service to the building from the water loop. Typically, this valve is installed at
the tee or an acceptable distance from the building. A valve must be provided on the domestic water service, which must be
tapped off of the combined eight-inch (8”) fire/domestic service outside of the building. The domestic water tap and valve should
be as close to the building as possible. Typically, the domestic tap and valve are located within five feet (5’) to ten feet (10’) of
the building. A blow up detail of this layout is recommended.
6. Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The Department
of Public Works will test and inspect all fire mains to a blind flange located inside the buildings. The blind flange with tap is used
for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must be restrained in the direction of
the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall be restrained with rods through the wall. A
pipe entering vertically through a slab shall be restrained through the floor to the ninety degree (90°) bend and thrust block. All
rods shall be a minimum of ¾” all thread. All pipes through walls and slabs must be Class 52 cement lined ductile iron pipe.
Confirm particulars to meet this requirement with mechanical designer.
7. Water services shall be either type K copper or SDR-9.
8. On October 24, 2022, City of Dover Council approved the new Cross Connection Control Program. This program requires certain
backflow prevention assemblies on water service connections to the city’s distribution system. This project will require a double
check valve assembly to be installed downstream of the water meter in the building.
9. All water infrastructure on the property will be owned and maintained by the property owner.
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall discharge or cause
to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff, subsurface drainage,
uncontaminated noncontact cooling water or unpolluted industrial process waters to any sanitary sewer”, this shall include
195
Página 196
Item 6.
Cold Storage Warehouse at 451 Garrison Oak Drive
File #: S-23-20
November 1, 2023
Page 3 of 4
condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as “…any system used for conveying rain water,
surface water, condensate, cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer, owner
and designers shall ensure during construction that no illegal discharges to the sanitary sewer system are created with the
site improvements.
3. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines. Rim and invert
elevations must be labeled on all sanitary structures.
4. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the right-of-way
and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty cast iron frame and
cover to prevent damage to the cleanout and lateral.
5. Sizing (flow) calculations must be submitted for all sanitary sewer mains showing that velocity and all other requirements are met.
6. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
7. If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County ordinance
requirements, must be provided. A construction detail for the proposed grease trap, as well as the proposed location, must be
provided on the plan.
8. All wastewater infrastructure on the property will be owned and maintained by the property owner.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must
be included as a note on the plan.
2. No trees may be planted within ten feet (10’) of utility infrastructure.
3. No structure may be installed within ten feet (10’) of utility infrastructure, please depict all underground utilities and structures
on the utility plan sheet to confirm compliance.
4. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2018 (.dwg format).
b. Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
SANITATION / STORMWATER / STREETS / WATER / WASTEWATER / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with extending and
providing service to the proposed development.
2. Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking Water for
review and approval. The owner/developer will be responsible for providing all completed forms and plan sets to the City of
Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the Office of Drinking Water until
review has been completed by our office.
3. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water &
Wastewater directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the site.
4. Water impact fees will be required to be paid prior to Certificate of Occupancy for this project.
196
Página 197
Item 6.
Cold Storage Warehouse at 451 Garrison Oak Drive
File #: S-23-20
November 1, 2023
Page 4 of 4
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated with extending
and providing service and capacity to the proposed development.
2. Prior to plan approval, it may be required to submit the sanitary sewer system plans to the DNREC, Division of Water Resources,
Surface Water Discharges Section for review and approval. The owner/developer is responsible for providing all application fees,
completed forms and plan sets directly to DNREC.
3. Wastewater impact fees will be required to be paid prior to Certificate of Occupancy for this project.
4. Depending on the effluent flow, the downstream pump station must be evaluated by the developer / engineer to verify it can
handle the additional effluent flow.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned,
flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan
set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist,
which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
SANITATION / STORMWATER / STREETS
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE
P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
197
Página 198
Item 6.
CITY OF DOVER ELECTRIC
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: NOV 1, 2023
APPLICATION: Cold Storage warehouse at 451 Garrison Oak Drive
FILE #: S-23-20
REVIEWING AGENCY: City of Dover Electric Department
CONTACT PERSON: Shawn Burgett, Engineering Services & System Operations Superintendent
CONTACT PHONE #: 302-674-7568
CONTACT EMAIL #: sburgett@dover.de.us
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE
WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all existing underground electric, communications and water facilities.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric
Department. Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to
construction. Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
198
Página 199
Item 6.
Cold Storage Warehouse at 451 Garrison Oak Drive
File #: S-23-20
Nov 1, 2023
Page 2 of 2
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook
is now available on the website at the following link: https://evogov.s3.amazonaws.com/media/27/media/13108.pdf.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. This project is outside of the service area for the City of Dover Electric Department. Please save this document for our
general notes if the apartments will be transferred to the city electric department in the future.
2. Provide load sheets if the new load requirements will change as soon as possible to verify proper sizing of transformers
and creation of primary fee estimates. Current load sheets can be found at the following link:
https://www.cityofdover.com/media/Electric%20Department/COD%20Electric%20Load%20Sheet.pdf.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON
AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
199
Página 200
C F
S-23-20
Item 6.
I I
T R
CITY OF DOVER Y E
DEVELOPMENT ADVISORY COMMITTEE O M
F A
APPLICATION REVIEW COMMENTARY
R
D.A.C. MEETING DATE: 11/01/23 D S
O H
V A
E L
APPLICATION: Cold Storage Warehouse at 451 Garrison Oak Dr
R
FILE #: S-23-20 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457
josika@dover.de.us
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND
COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE
APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed occupancy classification is storage.
2. Building Access shall be no further than 50 feet from a primary entrance.
Where buildings are provided with an automatic sprinkler system installed in accordance with
NFPA 13, access shall be no further than 100 feet from the primary entrance.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)
3. Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times
the width of the door(s) or for 10 feet, whichever is greater.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
4. Perimeter access shall be 100% and clearly shown on the plans.
Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings
of two or more stories, measured from the face of the building at grade with a maximum slope of
ten percent (10%). Plantings and utility services (includes condenser units, transformers, etc.)
shall be permitted within the perimeter access, and shall not interfere with emergency services
fire ground operations.
If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building
perimeter shall not be included in the calculation of Percent of Perimeter Access.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)
Where parking is located between the building and perimeter access area, parking shall not be
located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior
wall for building of two or more stories.
200
Página 201
Item 6.
5. Fire lanes shall cover 100% of the proposed building.
Fire lanes are required to be 24 feet wide and run along the front of the building as determined by
the primary entrance(s). In cases where there is more than one primary entrance(s), each shall be
served by a fire lane even if this exceeds the percentage as required.
The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and
the closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one
or two stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in
height.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5)
6. Where parking is located between the building and the fire lane, parking shall not be located
closer than 15 feet to the exterior wall.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1)
Where parking is located between the building and the perimeter access area, parking shall not
be located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the
exterior wall for building of two or more stories. 2021 Delaware State Fire Prevention
Regulations, 705, Chapter 5, 3.5.2
7. All Fire Lanes shall be marked as follows:
both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top
and face of the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid
yellow demarcation line shall mark the edge(s) of the fire lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
8. The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware
Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be
suitable for street surfaces
9. Fire lane signs shall be located as follows:
see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150
foot intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher
than eight feet (8’) above the pavement, signs shall be placed at each end of the fire lane, and
signs shall face all oncoming traffic.
Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in
lieu of fire lane signs and shall conform to the specifications of 7.6.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)
10. Where overhangs, canopies, balconies, or any other building or site features must project over
any fire lane, an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall be
provided and the portion of the building perimeter which contains overhangs, canopies,
balconies, or any other building features shall not apply towards the fire lane accessibility
requirements of Section 4.0, Table 5-1 in this chapter.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.8)
11. Emergency access to rear building areas compliant with City of Dover Code (Appendix B-
Zoning, Article 5- Supplementary Regulations, Section 17);
all four stories and greater buildings require 24ft fire lane at the rear.
201
Página 202
Item 6.
All two to three story apartment structures require an 18ft Secondary Fire Lane at the rear.
All townhouses (3-8 units with no fire protection) require a 16ft alley or 18ft secondary fire lane
at the rear.
12. Any dead-end road more than 300 feet in length shall be provided with a turnaround or cul-de-
sac as outlined in the 2021 Delaware State Fire Prevention Regulations 705, chapter 5, 2.3.
13. Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in
reference to this process.
14. Gated Areas: Fire Department access shall be provided to the property through the use of a
system or device approved by the Fire Marshal. The system or device required shall be located in
an area accessible to the fire department and approved by the Fire Marshal. All gates shall be
either automatic or manual.
An automated system shall consist of one manual and one automated means to open the gate.
The owner or their representative shall meet with the Fire Marshal prior to submission to agree
on the system. A letter of agreement shall be created and signed by both parties. The letter shall
include a detailed description of both the manual and automated means.
A manual gate shall consist of one manual means to open the gate. The owner or their
representative shall meet with the Fire Marshal prior to submission to agree on the means to
open. A letter of agreement shall be created and signed by both parties. The letter shall include a
detailed description of the manual means to open.
To be considered accessible for fire department apparatus the actual clear openings shall be not
less than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate
shall be setback from the perpendicular street by at least 50 feet.
Please contact this office to discuss options available to comply with this requirement.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)
15. Fire hydrants shall be installed per the requirements of City of Dover Public Utilities
Water/Wastewater Handbook, NFPA requirements, and Delaware State Fire Prevention
Regulations. City Ordinance Sec 46-9 (f).
5.1.1 Hydrant spacing as shown in the Fire Flow Tables shall be used as a general rule. Hydrants
shall be located at the direction of the State Fire Marshal so as to minimize friction in fire hose.
All hydrant spacing shall be located along available roads or at the direction of the State Fire
Marshal. This measurement shall be calculated by way of accessible thoroughfare(s) from the
building to be protected to the hydrant and may not necessarily be a radius. 5.1.3 Additional
hydrants shall be provided when the State Fire Marshal deems it necessary based on the
configuration of the site, building(s), exposures, construction, occupancy, and/or specific
hazard(s).
Fire Flow table 2, hydrant spacing shall be 800 feet on center for one and two family detached
dwellings, other residential, rowhouses and townhouses, assembly, health care, business,
education, storage, industrial, mercantile, and mini storage. (702, Chapter 6)
NFPA 1
18.5.2 detached one- and two-family dwellings, fire hydrants shall be provided for detached one-
and two-family dwellings in accordance with both of the following: 1. the maximum distance to a
fire hydrant from the closest point on the building shall not exceed 600 feet 2. the maximum
distance between fire hydrants shall not exceed 800 feet.
202
Página 203
Item 6.
18.5.3 buildings other than detached one- and two-family dwellings, fire hydrants shall be
provided for buildings other than detached one- and two-family dwellings in accordance with
both of the following 1. The maximum distance to a fire hydrant from the closet point on the
building shall not exceed 400 feet 2. The maximum distance between fire hydrants shall not
exceed 500 feet
16. All fire hydrants shall be marked as prescribed within the appropriate section of this regulation
and as illustrated by the appropriate figures of this regulation.
All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define
specific areas, where fire hydrants are located along a curb line with permitted parking, the area
between the fire hydrant and the street or fire lane shall be stenciled with four inch (4")
demarcation lines and the words "NO PARKING", demarcation lines shall be measured from the
center line of the fire hydrant and extend for a distance 15 feet on both sides.
Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked
vehicles they shall be treated as follows: fire hydrants shall be protected in all directions for a
distance of seven feet (7') with barriers or curbing, Minimum four-inch (4") diameter steel
bollards filled with concrete and marked yellow shall be installed at the outermost corners of the
fire hydrant demarcation area. The minimum height of the bollard shall be 36 inches above the
finished grade of the adjacent surface, and the steamer connection of all fire hydrants shall be
positioned so as to be facing the edge of the street, or traffic lane.
(2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2)
The owner is responsible if the hydrant is private.
17. Hydrant barrels shall be provided with reflective material, such as paint, durable for
highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel
under the top flange, hydrant bonnets shall be color coded based on the following criteria: class
AA 1500 GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 -
999 GPM - painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM -
painted black.
(2021 Delaware State Fire Prevention Regulations 703, Chapter 3. 4)
The owner is responsible if the hydrant is private.
18. Hydrants are to be Darling Co. B-62-B Breakaway https://american-usa.com/products/valves-
and-hydrants/fire-hydrants/5-1-4-american-darling-b-62-b-5
19. NFPA 72 compliant Fire Alarm System required per occupancy code requirements.
Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an
occupancy determined to be a place of assembly by the fire marshal and is capable of receiving an
occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with
NFPA codes governing the installation of fire alarms and the National Electrical Code.
Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined
to be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50
percent of the assessed value of the building and is capable of receiving an occupant load 75
persons or greater or is being enlarged to receive an occupant load of 75 persons or greater, shall
be required to install a complete fire alarm system in accordance with NFPA codes governing the
installation of fire alarms and the National Electrical Code.
Public mode audible requirements. To ensure that audible public mode signals are clearly heard by
occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average
203
Página 204
Item 6.
ambient sound level or five decibels (dB) above the maximum sound level having a duration of at
least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area
required to be served by the system using the A-weighted scale dBA. In the event the stated
requirement cannot be met a shunt trip relay/switches shall be the approved method of meeting
the intent of this section of the Code.
(City Code of Ordinances 46-171)
20. Sprinkler system required. System is to be monitored by an approved Fire Alarm System.
This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions
which are modified by more than 50% after the effective date of these Regulations. The 50%
figure shall be calculated utilizing the gross square footage of the building, structure, marine
vessel, premises and conditions as to arrive at the correct application.
Any proposal that is presented to the Office of the State Fire Marshal for review and approval for
a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross square footage
of a non-sprinklered building, may not have another such project for the same building submitted for
review and approval any sooner than three (3) years after the date of the final inspection unless sprinkler
projection is provided throughout the entire building.
In all buildings exceeding 10,000 square feet of aggregate, gross floor area.
In all buildings in excess of 40 feet in height or more than four (4) stories in height.
In all buildings or areas thereof used for the storage, fabricating, assembling, manufacturing,
processing, display or sale of combustible goods, wares, merchandise, products, or materials when more
than two (2) stories or 25 feet in height.
In all basement areas exceeding 2,500 square feet floor area.
In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and exceeding
two (2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or
Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment buildings
storage areas except individual unit closets that are located within individual residential living units.
In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA 101, as
adopted and/or modified by these Regulations. In all buildings or areas classified as "high hazard" under
the Life Safety Code, NFPA 101, or "extra hazard" under the Standard for the Installation of Sprinkler
Systems, NFPA 13, as adopted and/or modified by these Regulations.
All buildings used as dormitories, in whole or in part, to house students at a public or private
school or public or private institution of higher education. (16 Del.C. Ch. 88) This applies to all such
dormitories regardless if new or existing.
(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)
Places of assembly shall be sprinklered throughout in accordance with the most recently adopted
edition of NFPA 13 when the following apply:
All new indoor places of assembly with an occupant load of 150 persons or greater.
Any interior renovations of 50 percent or more to an existing place of assembly with an occupant
load greater than 150 persons.
Any additions or increase in interior size to an existing place of assembly that would create an
occupant load of 150 persons or greater.
Places of assembly where alcohol is served for consumption on the premises shall be sprinklered
throughout in accordance with the most recently adopted edition of NFPA 13 when the following
apply:
All new indoor places of assembly with an occupant load of 100 persons or greater and where
alcohol will be served for consumption on the premises.
204
Página 205
Item 6.
Any interior renovation of 50 percent or more to an existing place of assembly with an occupant
load greater than 100 persons and where alcohol will be served for consumption on the premises.
Any additions or increase in interior size to an existing place of assembly which would create an
occupant load of 100 persons or greater and where alcohol will be served for consumption on the
premises.
New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout in
accordance with the most recently adopted edition of NFPA 13.
(City of Dover Code of Ordinances 46-162)
21. Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow located
within 50 feet of main entrance. Access to the Fire Department Connection must be clear
unobstructed access as defined by the AHJ.
Fire department connections. Unless otherwise approved by the fire marshal, fire department
connections shall be on the street side of the building and shall be located and arranged so that
hose lines can be readily and conveniently attached to without interference from any nearby
obstructions as defined by the fire marshal's office. Fire department connections shall be a five-
inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover
Fire Hydrant and within 50 feet of the main entrance of the structure it serves. All fire
department connections shall be not less than three feet nor more than five feet in height above
finished grade. The fire marshal shall have the authority to require more stringent
requirements when deemed necessary. (City of Dover Code of Ordinances 46-162)
22. Parking and/or obstructions shall be prohibited in front of fire department connections for a
distance measuring from the center line and extending four feet on both sides.
(2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
23. Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose
would come off the fire equipment.
24. If there is any type of rack storage, the following will be required: 1) a diagram showing the
layout and type of rack system 2) a list and quantity of items being stored 3) a letter from an
authorized/licensed fire suppression contractor stating that in rack sprinklers are or are not
needed. If in rack sprinklers are not needed, a letter may be requested from an
authorized/licensed fire suppression contractor to ensure that the sprinkler system is adequate
for the storage presented.
25. All standpipe and sprinkler connections shall be marked as prescribed within the appropriate
section of this regulation and as illustrated by the appropriate figures of this regulation. All
standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow
demarcation lines to define specific areas, Solid yellow demarcation lines shall be measured from
the center line of the connection and extend for a distance of four feet (4') on both sides, and
where parking is allow between the building and the street or fire lane the solid yellow
demarcation lines shall extend from the end of the sidewalk surface to the street or fire lane
(Markings shall not be required on the sidewalk surface). All fire department connections
(standpipe and sprinkler) shall have a minimum 12" x 18" sign that reads FIRE DEPT.
CONNECTION, sign lettering shall be a minimum of 3 inches (3") in height with red scotchlite
letters on white scotchlite background. The sign shall be clearly visible from the fire lane or
roadway, and signs using NFPA international symbols shall be an acceptable alternative. (2021
Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)
205
Página 206
Item 6.
26. Standpipes shall be provided in all areas and buildings as required in the codes and standards
listed in Regulation 701 as well as the following areas or buildings:
In all Class A and Class B places of assembly and institutional occupancies two (2) stories or 25
feet in height or over,
In any building over three (3) stories, In any building over 35 feet in height,
In any building that has a floor above the first floor over 10,000 square feet gross floor area,
In all buildings where the 1st floor exceeds 60,000 gross square feet,
a Class I horizontal standpipe system installed in accordance with the applicable codes and
standards listed in Regulation 701 of these Regulations shall be provided. All standpipe systems
shall be installed in accordance with the applicable codes and standards listed in Regulation 701.
The standpipe system shall be carried up with each floor and shall be installed and ready for use
as each floor progresses.
Standpipes shall not be more than one floor below the highest forms of staging,
The 2½-inch of hose connections on Class I systems shall be provided in the following locations,
At the highest intermediate landing between floor levels in every required exit stairway,
Where intermediate landing is not provided, hose connections shall be permitted to be located at
the main floor landings in exit stairways when approved by the authority having jurisdiction,
Where the local fire department has the capability of providing the required pressure,
hydraulically designed standpipe systems in fully sprinklered, non-high-rise buildings shall be
designed to provide the required waterflow rate.
A sign shall be provided at each landing, in all interior stairways, designating the floor level.
(2021 Delaware State Fire Prevention Regulations 702, Chapter 4, 2)
27. The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be
protected from impact damage by impact protection. Natural gas and LP gas meters, regulators,
and valves located inside structures shall have impact protection, except when located in
separate protected utility rooms.
Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The
bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in
concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48
inches (four ft.) in height above the finish grade elevation. Any deviation of the stated
requirements must be approved by the fire marshal and/or chief building inspector. The above
dimensions shall serve as the requirement for installation; however, the fire marshal and/or chief
building inspector shall have the authority to require more stringent dimensions to fit the needs
of devices warranting impact protection.
Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors
shall be of fluorescent or have a reflective coating. Any deviation of the stated requirements must
be approved by the fire marshal and/chief building inspector.
(City of Dover Code of Ordinances, 46-4)
206
Página 207
Item 6.
28. Every house, building or structure used or intended for use as living quarters or as a place for
conducting business, and having any wall facing or abutting any public or private street or alley,
shall have displayed on that wall, in legible, easily read characters which are of contrasting color
to the background, the proper street number for such house, building, or structure in accordance
with the following:
One-family and two-family residential structures, height, the number shall measure a minimum of four
inches in height, location, the number shall be placed on the house above or to the left or right of
the front entrance, color, the number shall be contrasting to the background color, Arabic numerals,
all numbers shall be Arabic numerals.
Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when
identifying individual apartments with exterior doors, and 12 inches when identifying buildings
with apartment complexes where there are two or more buildings not assigned street addresses.
Individual buildings with street addresses shall have numbers measuring six inches, location,
numbers shall be placed either in the center of the building or on the street end of the building so
as to be visible from either the public or private street or from the parking lot, color, numbers shall
be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic
numerals.
Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in
height, location generally, numbers shall be placed either in the center of the building or on the
street end of the building so as to be visible from either the public or private street or from the
parking lot,
property line or driveway, should the building be located far enough from a public or private road so
that the numbers are not clearly visible from the street, then the street address shall also be
posted on the property at or near the property line or driveway to said building,
color; each building, numbers shall be contrasting to the background color and shall be placed on
each building in the complex,
Arabic numerals, all numbers used shall be Arabic numerals,
Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite
number affixed to the front of the tenant space and on the outside of the rear door which
corresponds with that tenant space. Numbers shall measure six inches in height.
(City of Dover Code of Ordinances, 98-344)
29. A lock box (Knox) containing any and all means necessary for fire department access shall be
provided at the following occupancies: any occupancy that contains a fire alarm signaling system
that is monitored off-site, or any occupancy that contains an automatic sprinkler system.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)
Secured key systems. When required; exemption. A secured key system shall be required for any new
or existing building where a fire alarm or sprinkler system is being installed. It shall be the
responsibility of the owner or occupant to keep a set of keys in the secured key box that are
current to the locks of the protected occupancy. Buildings with 24-hour staffing or guard
service shall be exempt from this subsection.
Location. The secured key system shall be located as close to the main entrance as possible.
Should the building design not allow the secured key system to be located by the main
207
Página 208
Item 6.
entrance, the fire marshal and fire chief shall come to an agreement as to an alternate
location for the key box. A secured key system, once installed, shall not be obstructed from
view or obstructed by any means that would delay the fire department access to the box.
Required keys. Keys to be secured in the key box shall include keys to all points of ingress or
egress, whether on the interior or exterior of the building, and keys to locked mechanical
rooms, electrical rooms, elevator rooms, fire alarm and sprinkler controls and any area
protected by automatic fire detection. Keys to individual residential apartment units are not
required.
Ordering responsibility. It shall be the responsibility of the general contractor to order the key
box for new buildings. It shall be the responsibility of the owner or tenant to order the key
box for existing buildings.
Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted
before the installation of a key box.
(City Code of Ordinances 46-127)
Knox Box to be mounted 6 feet above ground level
30. All required means of egress shall have an exit discharge consisting of a non-slip surface and
leading to and terminating at a public way. NFPA 101
31. All new passenger elevators in a building shall be provided with a car sized to accommodate an
ambulance cot 24 inches (609 mm) by 84 inches (2133 mm) in its horizontal open position.
Where two or more new passenger elevators are located in a single hoist way and serve all or the
same portion of the building, only one elevator car that provides a car sized to accommodate an
ambulance cot 24 inches by 84 inches in its horizontal position for each hoist way shall be
required. Elevator cars required to comply with 15.1 or 15.2 shall be identified by the international
symbol for emergency medical services (star of life). The symbol shall be not less than 3 inches
(76 mm) in height and shall be placed inside on both sides of the hoist way door frame.
Firefighter recall keys shall be provided in a manner acceptable to the local fire department.
(2021 Delaware State Fire Prevention Regulations 705, Chapter 1, 15)
32. Buildings over 25,000 Sq. Ft are to have radio performance testing done prior to Final CO. This
must be scheduled in advance with an authorized vendor.
33. Project to be completed per approved Site Plan.
34. Full building and fire plan review is required.
35. Construction or renovations cannot be started until building plans are approved.
36. Fire alarm systems, fire suppression systems, hoods, exhaust ducts, and hood suppression
systems require a fire permit from the Fire Marshal’s Office. This work cannot be started until
the permit is approved.
37. Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
38. The following is City Ordinance, Appendix B-Zoning, Article 8 Enforcement and Penalties:
Section 1. - Building permits.
208
Página 209
Item 6.
No building or structure in any district shall be erected or structurally altered without a building permit
duly issued upon application to the building inspector. No building permit shall be issued unless the
proposed construction or use is in full conformity with all the provisions of this ordinance. Any building
permit issued in violation of the provisions of this ordinance shall be null and void and of no effect,
without the necessity for any proceedings for revocations or nullification thereof, and any work
undertaken or use established pursuant to any such permit shall be unlawful (see section 4 for
penalties).
1.1 No building permit shall be issued for the construction or alteration of any building upon a lot
without frontage upon, or legal permanent access to, a public street improved to the satisfaction of the
planning commission, or without access to a public sewer.
1.2 No building permit shall be issued for any building where the site development plan of such
building is subject to approval by the planning commission, except upon approval of such plans
approved by the said commission.
1.21 No building permit shall be issued for any building in a subdivision unless the subdivision plot has
been approved by the planning commission.
1.3 No building permit shall be issued for a building to be used for any conditional use in any zone
where such use is allowed only with approval of the planning commission, unless and until such
approval has been duly granted by the said commission.
(Ord. of 7-12-1993, § 3)
ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:
1. This is a high rise and large area building, please see additional regulations listed below.
2. Please confirm that the parking is 15’ from the building as outlined in item #6 listed
above (we will discuss the tractor trailer bays).
3. Please advise where the main entrance will be located.
4. Please refer to item # 14 listed above regarding access to the fenced areas.
5. Please refer to item # 15 listed above regarding fire hydrants. They need to be shown and
need to be spaced no farther than 800’ apart. These cannot be on the same system as the
fire suppression system. One needs to be within 300’ of the FDC.
6. No parking is allowed on Garrison Oak Drive due to the street width.
APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):
2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association)
2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association)
2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association)
2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association)
2009 IBC (International Building Code)
Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations
2021 Delaware State Fire Prevention Regulations
City of Dover Code of Ordinances
*If you have any questions or need to discuss any of the above comments, please call the above
contact person listed.
209
Página 210
Item 6.
Chapter 5 Mid Rise, High Rise and Large Area Buildings
1.0 Application
1.1 This chapter shall apply to all new buildings and this chapter shall apply to all existing
buildings that undergo a change in occupancy.
1.2 This chapter shall apply to all buildings, structures, marine vessels, premises, and
conditions which are modified by more than 50% after the effective date of these Regulations.
The 50% figure shall be calculated utilizing the gross square footage of the building, structure,
marine vessel, premises and conditions as to arrive at the correct application.
1.3 Any proposal that is presented to the Office of the State Fire Marshall for review and
approval for a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of
the gross square footage of a non-sprinklered building, may not have another such project for the
same building submitted for review and approval any sooner than three (3) years after the date
of the final inspection unless sprinkler projection is provided throughout the entire building.
19 DE Reg. 843 (03/01/16)
3.0 High Rise Building Fire Protection Features Required.
3.1 Fire Command Center
3.1.1 Every High Rise building shall contain a fire command center for fire department
operations in a location reviewed by the responsible Fire Chief and approved by the Office of the
State Fire Marshal.
3.1.2 The fire command center shall contain the following:
3.1.2.1 Voice alarm and p