Página 1
Silver Lake Commission
July 30, 2025
5:30 PM
In person & Via Weblink
**DRAFT**
Members Present Staff & Guests
Kathy Doyle Carolyn Courtney, Parks & Recreation Staff
Michael Lewis Nichole Arnold, Parks & Recreation Staff
Anthony Morris Bryn Wambaugh, City of Dover Environmental Scientist
John DeMarie Aireal Vickers, City of Dover Environmental Scientist
Charles Salkin 3rd District Resident
WELCOME & CALL TO ORDER
The meeting was called to order at 5:30 PM
MEMBER & STAFF INTRODUCTION
Brief Introductions around the table.
MEETING MINUTES
Minutes were approved with minor changes, with said changes applied the minutes will be recorded accordingly.
CALL TO ORDER/VACANT POSITIONS
Kathy Doyle stepped up as acting chair for tonight’s meeting. The commission has should have 7 active members with city staff
support. One seat remains open. Doyle asked about meeting outside with members to discuss changes, Ms. Courtney looked
into this and found the commission cannot conduct any official business without a quorum. No decisions can be made, and no
votes can be taken. Mr. DeMarie had a recommendation to fill the vacant spot and recommended William Ardito. An e-mail
will be sent to him to discuss this position.
DOVER POLICE – PARK REPORT UPDATE
Dover Police were unable to attend the meeting; however, they sent Ms. Courtney an e-mail stating that they had no concerns
at that time about the park. Attachment A.
STORMWATER AND EARTH DAY UPDATES
Bryn and Aireal presented to the group more information on Earth Day. There was a Storm water day that was hosted for the
week with informative information about storm water day, how to join the next years Earth Day event, and a thank you to the
presenters. The events that were hosted throughout the week were a nature walk, which was a guided walk, the screening of
the Lorax film at the Dover library, and litter pick up day. The community joined in on the fun and there were around 63
attendees that played the games and around 50 city employees that showed up for the fun. On April 28th, 2025, the Mayor
awarded Bryn and Aireal a proclamation. Bryn and Aireal were excited about the community coming together for Earth Day and
look forward to doing it again next year and hoping to have more volunteers.
RIPARIAN BUFFERS UPDATES
Mrs. Doyle explained to the group what a water shed was and exactly how riparian buffers work. A discussion took place on
riprap and riparian buffers. Mrs. Doyle noted that approximately a month ago, the city ordinances were amened to
requirement riparian buffers on new construction around bodies of water. Ms. Courtney responded to Mrs. Doyle that at this
time, the city is not in violation of city or state ordinances as they do not have any new construction projects on or near the lake
shoreline.
SILVER LAKE AND ST. JOHNS RIVER UPDATES
Mrs. Doyle inquired about testing of the water and lake. It was agreed staff will reach out to DNREC divisions that may be
helpful with testing procedures and latest data for the lake. Ms. Courtney will reach out to Fisheries and report back.
SILVER LAKE MASTER PLAN
The Silver Lake Master plan has been approved through council for FY26. The amount approved was for
$75,000.00 and this would include fitness stations along paved trail, woodlands assessment, plans to preserve the
Página 2
old African American cemetery, consideration of current and future park facilities such as: the lake, beach and
indoor bathrooms. Discussion took place on how the master plan would move forward. Ms. Courtney noted as
staff begins to work on this project, open houses/workshops etc would be opened for the public to offer their
input to the master plan. It is likely the city may apply for ORPT grants to assist with project funding. There is a
probability staff will work with a consultant to facilitate the master plan project along with community
involvement. However, at this time, staff is focused on completion of the Dover Park Community Building/Spray
Pad, All Inclusive Playground and the Skatepark. The Silver Lake Master Plan will be addressed as the year moves
forward. The commission members will be kept updated.
SILVER LAKE DRAW DOWN
The City of Dover drawn down week will be October 6th through October 17th, 2025. Notice of Intent letters will be mailed to
licensed boaters and lakeside property owners within the next few days.
WATERSHED MAP
Ms. Doyle shared watershed maps and reviewed their importance. Attachment 2.
ENDING COMMENTS
Mrs. Doyle was nominated to serve as Chair of the committee. The group would still like to meet quarterly, and our next
meeting is scheduled for November 5th.
(AN ERROR OCCURRED DURING THE TAPING OF THE MINUTES, THE SOUND WAS NOT AVAILABLE)
Página 5
City of Dover
Silver Lake Sub-
Watershed
Implementation
Strategy
For the Silver Lake
Commission
Lara Allison
6/30/2011
Página 6
TABLE OF CONTENTS
Introduction ................................................................................................................................................................1
Saint Jones River History ......................................................................................................... 1
Existing Watershed Conditions................................................................................................ 4
Watershed Baseline Assessment............................................................................................. 5
Sub-watershed Delineation ..................................................................................................... 6
Executive Summaries of Watershed Projects ...............................................................................................8
Silver Lake Sub-Watershed .......................................................................................................... 8
Sub-Watershed Implementation Strategy ................................................................................................... 11
Strategy ..................................................................................................................................... 11
Monitoring ................................................................................................................................. 13
Sub-Watershed Management Opportunities.............................................................................................. 25
Introduction ............................................................................................................................... 25
Silver Lake sub-watershed projects ........................................................................................... 26
Current Projects..................................................................................................................... 26
Partner Projects ..................................................................................................................... 34
Future outlook of the Silver Lake sub-watershed ..................................................................... 36
Página 7
INTRODUCTION
The St. Jones River is located in Kent County, Delaware and hosts the state capital, the City
of Dover. The City of Dover has a large influence on the St. Jones River, its tributaries, and
the entire Watershed of which it drains. Silver Lake, a man-made lake formed by a dam in
the St. Jones River, is the largest body of water in the City, and has attracted residents and
visitors to enjoy its benefits. The growing number of visitors and increasing development of
land have taken their toll on the Lake. In 1986, the Silver Lake Commission (Commission)
was formed following the recommendation of Dover’s City Council. On August 27, 1990, by
request from then-Mayor Jack Richter, the Commission was officially adopted as an advisory
committee to the City Council and City staff.
Since then, the Commission has worked to improve the condition of the Lake and provide a
forum for public involvement on issues related to the Lake. Commission members seek
ways to improve the Lake’s water quality, wildlife habitat, open space and park
opportunities, and water-related activities through participation and coordination with
other government bodies and institutions (Dover, 1990).
The purpose of this document is to provide the Silver Lake Commission and its partners
with a strategy for implementing water quality-improvement projects that influence the
ecological condition of Silver Lake. A prioritized list of potential Best Management Practice
(BMP) opportunities with the greatest cost-benefit ratio to Silver Lake shall serve as a
resource to the Commission for future project planning.
In addition to this document, other resources are available for planning goals outside of this
document’s reach, such as wildlife habitat improvement, open space creation, or
recreational activity implementation.
SAINT JONES RIVER HISTORY
The St. Jones River is dammed at Silver Lake and winds down 10mi towards the Delaware
Bay passing through commercial, residential, and agricultural areas along the way. The
watershed of the St. Jones River drains the upland area of the River in addition to its
tributaries including Fork Branch, Maidstone Branch, Cahoon Branch, McKee Run, and
Dover Creek. 57,643 acres of land drain into the St. Jones River, ultimately emptying into
the Delaware Bay (Rogerson, Jacobs, & Howard, 2010).
1
Página 8
Figure 1. Location of the St. Jones River Watershed in central Delaware.
2
Página 9
Land use activities can characterize a particular region, such as a watershed, and provide a
snapshot of the area showing how it is being used. Comparisons between land use data
from different points in time provide insight into how the landscape has changed and what
trends have started to appear. Land use data allows planners and land managers to make
informed decisions regarding the future development and protection of a watershed.
Historically, the watershed land use characteristics were dominated by agriculture. In
today’s landscape, while agriculture is still a dominant land use, it is quickly being replaced
by development, more specifically, residential development. The National Land Cover
Dataset (NLCD) in 2007 shows almost 70% of the watershed as agricultural or developed
land. Information from the NLCD in 1997 compared to 2007 shows a 6.5% decrease in
farmed land and a 6% increase in developed land (Table 1). This suggests an almost direct
conversion of farmland to developed land. As stated in the “Technical Background Report,
Silver Lake Watershed” by Earl Shaffer, “urbanization through the conversion of land to
permanent impervious surfaces such as streets and houses, represents an irreversible
impact on the watershed” (Shaffer, 1989). Proper planning is necessary to prevent costs
associated with clean-up efforts downstream of development; it is also necessary to protect
ecologically important areas that play an integral part in the health of the watershed.
A more detailed description of the history of the St. Jones River and watershed can be found
in the DNREC report “Technical Background Report, Silver Lake Watershed.”
Table 1. Land use changes for the St. Jones River watershed between 1997 and 2007
(Rogerson, Jacobs, & Howard, 2010).
Land Use Category 1997 (%) 2007 (%) 10-year % Change
Developed 25.5 31.5 +6.0
Recreational 1.4 1.8 +0.4
Farmed 44.5 38.0 -6.5
Forest 9.8 8.4 -1.4
Wetlands 14.9 15.1 +0.2
Water 2.1 2.7 +0.6
Beaches/Sand <1.0 <1.0 0
Extraction or
1.8 2.4 +0.6
Transitional
3
Página 10
Figure 2. Land Use in the St. Jones Watershed in 2007 based on NLCD land use
categories.
EXISTING WATERSHED CONDITIONS
Under the Federal Clean Water Act, the State’s Department of Natural Resources and
Environmental Control (DNREC) has the responsibility of monitoring the water quality in
the St. Jones Watershed and other watersheds in Delaware. DNREC analyzes water samples
for impairments that could compromise the integrity of the waterways and the many uses
they provide. Impaired waterways that do not meet the specified State and Federal
standards are listed on the national 303 (d) list. If a waterway is on the list, under the
Federal Clean Water Act, DNREC is required to develop a Total Maximum Daily Load
(TMDL) to remediate the water quality of the watershed. A TMDL was developed for the St.
Jones Watershed to address the impairments found in all of the Watershed segments.
The State of Delaware’s 2010 Combined Watershed Assessment Report (305(b)) and
Determination for the Clean Water Act Section 303(d) List of Waters Needing TMDLs
4
Página 11
identifies 8 listed water segments: 2 tidal segments of the St. Jones River, 3 freshwater
stream segments, and 3 freshwater lakes or ponds. Reasons for listing include bacteria,
dissolved oxygen (DO), PCBs, nutrients, dioxin, mercury, DDT, arsenic, biology, and habitat
(DNREC, April 2010). The most probable source of these pollutants is from Non-Point
Source (NPS) pollution. TMDLs are currently in place to reduce pollutants and eventually
remove water segments off the impairment list (303(d)). TMDLs should be used as a guide
for prioritizing water quality improvement projects and incorporated into future land
planning and management decisions.
WATERSHED BASELINE ASSESSMENT
A baseline assessment of the entire St. Jones Watershed (Watershed) was completed by
Duffield Associates, Inc. (Duffield) in October 2008. With help from volunteers, Duffield
identified and evaluated potential pollution control opportunities in the sub-watersheds
and urban areas that would improve water quality and prevent impairment. In total, 158
opportunities were identified, scored, and prioritized, including 26 WMWQ technology
opportunities and 132 upland opportunities. An additional five potential corridors for
preservation/land management opportunities were also identified.
The baseline assessment indicated various sources and types of water quality impairment.
Duffield then identified several practices that could reduce pollution in the Watershed and
selected sites to evaluate the practices. “Upland target areas included opportunities such as
retrofitting existing sites with revised best management practices (e.g. bioswales,
bioretention) and select neighborhood and hotspot sites that could increase water quality
protection by using different site or land management practices. The upland sites were
ranked from high to low priority. The WMWQ sites were evaluated for six technologies,
which focused on wetland/floodplain restoration and creation, buffers, infiltration, and
preservation. The WMWQ sites were scored and then ranked by Watershed-wide, sub-
watershed, technology, and site. Table 5 shows Watershed-wide rankings for total WMWQ
scores and individual WMWQ technology scores for each site evaluated” (Duffield
Associates, Inc., October 2008). (Christina Tributary Action Team and Water Resources
Agency, 2007; F.X. Browne, 1988; DNREC, City of Dover, and Advisory Committee, 1996)
Projections for future impervious cover are increasing in all four sub-watersheds (Table 2).
The Silver Lake sub-watershed is projected to have the greatest amount of total area of
imperviousness (5,122.4 acres), while the Tidbury Creek sub-watershed is projected to
have the greatest increase of imperviousness relative to total land area (27.6%).
5
Página 12
Table 2. Sub-Watershed Potential Future Land Use Statistics and Existing Protected Lands
SUB-WATERSHED DELINEATION
For the purposes of this report, the four sub-watersheds identified by the Duffield Report
(Duffield Associates, Inc., October 2008) will be used and referenced throughout this
strategy.
The Duffield report created a map that delineates the sub-watersheds of the St. Jones
Watershed based on existing geospatial data (Figure 3). The sub-watershed delineation
map is used to more accurately report data and recommendations in each sub-watershed.
The sub-watershed boundaries reported by Duffield are as consistent as possible with those
reported by DNREC. The sub-watersheds include: Isaac Branch, Silver Lake, St. Jones River,
and Tidbury Creek.
Water bodies within each sub-watershed include:
Silver Lake- Fork Branch, Penrose Branch, Maidstone Branch, Cahoon Branch,
Puncheon Run, Upper St. Jones River, Silver Lake
Isaac Branch- Isaac Branch, Allabands Mill Stream, Almhouse Branch
St. Jones- Lower St. Jones River
6
Página 13
Tidbury Creek- Tidbury Creek, Red House Branch, Newell Branch, Voshell Pond,
Derby Pond
Figure 3. Sub-watersheds of the St. Jones River Watershed delineated.
7
Página 14
EXECUTIVE SUMMARIES OF WATERSHED PROJECTS
SILVER LAKE SUB-WATERSHED
From its inception, the Silver Lake Commission (Commission) worked towards improving
Silver Lake and its associated drainage area, the sub-watershed within the St. Jones
Watershed. Through partnerships with state, county, local governments, and non-
regulatory organizations, the Commission has completed numerous successful projects. It is
also continuously adapting and improving projects to meet the challenges of difficult
problems that arise in Silver Lake (Lake). The following lists identify past projects
completed or attempted, and the background behind each project.
i. Silver Lake.
1. Biological stimulant. A new, proprietary product came recommended to
DNREC staff by officials who used it to treat algal growth in stormwater
ponds and water treatment facilities in California and Virginia. The product
was designed to alter the nutrient ratios of carbon, nitrogen, and
phosphorus, and encourage the growth of naturally occurring bacteria that
is usually suppressed by overabundant algal blooms. At the time, algal
blooms outcompeted natural bacteria for the available nutrients in the Lake.
DNREC staff, alongside City of Dover personnel, decided to test this
biological formula in Silver Lake and other smaller lakes and ponds in
Delaware. It was applied to Silver Lake during the summer of 1996 every
two weeks above the causeway. Ideally, the currents move some of the
product below the causeway to improve algae conditions throughout the
entire Lake. Using this method, the annual cost to the City is approximately
$15,000. If an additional application needs to be applied below the
causeway to achieve the desired results, the cost can increase to $25,000,
plus the cost of additional supplies and personnel time.
The results of the application of the biological stimulant were somewhat
inconclusive. During the summer of 1996, above average rainfall events
occurred in the area of Silver Lake. Silver Lake saw decreased amounts of
algal blooms, however, it is uncertain whether that was a result of the
stimulant, or the lake’s higher, rain-induced flushing rates. City and DNREC
staff had hoped to apply the stimulant the following summer to compare
results between separate seasons; however, the company supplying the
product had closed before the next round of testing could be completed
(Tyler, 2011) (DNREC, City of Dover, and Advisory Committee, 1996).
8
Página 15
2. Aeration. Aeration of Silver Lake was a recommendation from the report by
F.X. Browne Associates and also in a discussion paper by DNREC, the City of
Dover, Kent County, and an advisory committee, (“Options for the Protection
and Improvement of Silver Lake”) and was considered an option to increase
the dissolved oxygen content of the Lake waters and enhance vertical
circulation (DNREC, City of Dover, and Advisory Committee, 1996). Ideally,
this would improve circulation of the water column, increase habitat for
aerobic organisms, reduce or eliminate fish kills, reduce internal nutrient
loadings, decrease blue-green algae populations, and improve water column
oxygenation. This technique was described as being best suited for shallow
lakes where temperature stratification is minimal. However, the costs
associated with the amount of materials and equipment necessary for
aerators to operate effectively in Silver Lake were high. There were also
concerns regarding boat traffic in the lake and whether recreationalists
using the lake would damage the aerators and associated components.
Later, DNREC scientists advised against the use of aerators because of the
determination that it would re-suspend phosphorus into the Lake (Tyler,
2011) (Edgell, 2011).
3. Alum. From the dismissal of the use of aerators grew the interest in using
alum to alleviate the nutrient-related problems in the Lake. As suggested by
the F.X. Browne report alum would bind phosphorus at the sediment-water
interface and prohibit phosphorus from entering back into the water column
(F.X. Browne, 1988). At the time, the technique was new and little was
known about the lake characteristics needed for the process to be effective.
Its use in coastal plain ecoregions, where shallow water ponds and lakes are
common, is not feasible due to the short hydrologic residence time and
sediment disturbance from physical and biological factors. Boating on the
Lake is a popular activity and wave action from the boats would resuspend
particulate phosphorus and particulate aluminum. Also, the expense to
purchase alum alone is high (Greene, 2011).
ii. Silver Lake Sub-watershed
1. Stormwater retrofit at Delaware State University. In both the F.X.
Browne study and “Options” report, recommendations for the creation of
“forebays” at several inflow points into Silver Lake to try and trap sediment
and other pollutants before washing into the Lake. One site where this was
completed is located at the intersection of State College Road and N. College
Road on the property of Delaware State University in Dover. The
constructed forebay treats approximately 150 acres of commercial and
industrial land, including 1.2 miles of the nearby 6-lane highway which is
9
Página 16
one of the most traveled in the state. The project consists of a forebay area
designed to capture the majority of the sediment and anything not captured
there overflows to a shallow wetland area where additional water treatment
can occur. In total, the project area is approximately 3 acres. Funds for the
project came from partners including DNREC, City of Dover, Kent County,
and Kent Conservation District. Additional monies came from DNREC
penalty funds, 21st Century fund, and DelDOT pavement and rehabilitation
funds (Division of Soil and Water Conservation).
2. Dredging of Mirror Lake. Mirror Lake is a shallow body of water
downstream of the Silver Lake dam and adjacent to the intersection of
Loockerman Street and Park Drive in Dover. The lake is tidally influenced by
the St. Jones River and has a tidal range of approximately 1.0 foot. Over time
a sand bar has developed from sediment build-up that is deposited and is
visible at low tide. The City of Dover was interested in the improvement of
Mirror Lake for environmental and aesthetic reasons and asked DNREC staff
for recommendations. Staff from DNREC’s Division of Soil and Water
Conservation performed a bathymetric survey of the Lake in February 1997
and sediment core borings in September 2004 as a preliminary step to
investigate the possibility of dredging to remove the accumulated sediment
and other potential contaminants. DNREC provided two methods of
dredging with cost estimates for each method. Mechanical dredging with
truck haul disposal carried a price tag of approximately $427,500 and
hydraulic dredging with geotubes had a cost of approximately $538,500 at
the time of the estimation in 2007. Insufficient funds for the project halted
any further progress for dredging Mirror Lake. DNREC revisited the topic
again in 2010 by initiating a comprehensive analysis on the original
sediment cores taken in 2004, preparing new cost estimates for dredging, of
$1, 500,000, and speaking with the City of Dover and Silver Lake
Commission about potential alternatives in preparation of the results of the
analysis as the costs for dredging may be too high. DNREC also wishes to
explore less expensive and invasive approaches to addressing the sediment
sand bar, while maintaining the goal of reducing the impact to human and
wildlife health.
Additional recommendations were made by F.X. Browne and the “Options” report, however
only the items listed here have been acted upon thus far.
10
Página 17
SUB-WATERSHED IMPLEMENTATION STRATEGY
STRATEGY
The Silver Lake Commission (Commission) re-evaluated their approach to solving Sliver
Lake’s water quality problems around 2005-2006, following their attempts at using large,
solitary capital improvement project methods. Historically, the water quality problems
facing the Lake were compounded due to many non-point sources discharging into the Lake
untreated. The new approach focuses on a watershed-based method that addresses
pollutant problems before they enter the Lake; in this way, pollutants are captured and
filtered before they can degrade water quality in Silver Lake. This proactive approach
encourages the completion of Best Management Practices (BMPs) throughout the
watershed to alleviate the compounded effect in the Lake. While the BMPs may not capture
all pollutants before entering the Lake, addressing the pollutants before they enter the Lake
will significantly improve water quality.
To jumpstart the new watershed-based approach, DNREC hired Duffield Associates, Inc.
(Duffield) to perform a watershed-wide assessment to identify water quality improvement
projects. Duffield performed a baseline assessment in 2007 and published the “St. Jones
River Watershed Baseline Assessment Technical Memorandum” (Baseline Assessment), in
October 2008, which detailed the results. The information gathered provided the basis for
future project recommendations and included information on Watershed and sub-
watershed characteristics, as well as current and projected watershed conditions, to
determine future issues and impairments. The Baseline Assessment identified potential
pollution control opportunities by using information based on current reports, geospatial
data, current regulations, and field review of actual stream bodies. During the field review,
staff from DNREC, the Center for Watershed Protection (CWP), and Duffield documented
visual cues and other watershed conditions that indicate potential water quality
impairments such as: lack of riparian buffer area; undersized culverts downstream from
development; point source discharge pollutant problems; older developments without
stormwater quality best management practices; uncontrolled stormwater runoff - severe
channel erosion; lack of infiltration basins; isolated wetland loss due to lack of regulations;
and agricultural nutrient loading.
These impairments can be addressed and categorized into two categories “upland
restoration” and Watershed Management Water Quality technologies (WMWQ), (Tyler,
2011) which include: tree planting; additional native landscaping; stormwater pond
maintenance, creation, or bioretention; impervious cover removal; on-site stormwater
management (e.g., rain barrels, rain gardens, green rooftops); creation/restoration of
upland buffers; wetland/Floodplain Creation and/or Restoration; stormwater Infiltration;
stream channel improvements; preservation of streams, wetlands, floodplains, and buffers;
and flood control. In the St Jones Watershed, 26 WMWQ technology opportunities and 132
11
Página 18
upland opportunities (total of 158 opportunities) were identified, screened, scored, and
prioritized in the Implementation Plan as potential projects to improve water quality. The
initial scoring and ranking of selected sites and technologies were conducted based on a
system of weighted factors and scoring parameters established by the project team (DNREC,
Duffield Associates, and CWP). For WMWQ sites, six technologies that focused on
wetland/floodplain restoration and creation, buffers, infiltration, and preservation were
evaluated for each site. The sites were then scored on a scale of 1 to 10 for potential, and
ranked based on a watershed-wide scale, sub-watershed, technology-specific, and
individual sites (Table 3). Upland sites were ranked into high, medium, or low priority
based on screening factors and scoring criteria developed by the project team (Table 4).
The list can be organized according to a certain target area, such as a sub-watershed (Table
5). The majority of pollution control opportunities throughout the entire watershed occur
within the Silver Lake sub-watershed (Table 6).
As part of the final step in the watershed study of the St. Jones River basin, Duffield
prepared “St. Jones Watershed Implementation Plan,” in February 2009 to present
strategies and potential prioritization to achieve the pollution control goals using the
opportunities identified. The Plan examined several methods of implementation strategies
for all of the sub-watersheds found in the overlying St. Jones Watershed (Watershed). This
provides the option for different organizations, such as municipalities, DNREC, Kent County,
or regional groups, to select the strategy that best suits their goals and priorities. The
strategies were broken down into three approaches: ranking, technology, and sub-
watershed. Duffield identifies the sub-watershed approach as the preferred strategy, citing
targeted multi-faceted improvements can have significant impact on water quality
improvement. A sub-watershed strategy is also conducive to various funding sources that
may become available. As part of the Plan, Duffield recommends initiating the sub-
watershed strategy with the Silver Lake sub-watershed, the largest in the entire Watershed.
Silver Lake sub-watershed almost fully encompasses the City of Dover, as well as the
headwaters to the entire Watershed. Activities that take place in the headwaters of any
watershed impact the overall health of the entire watershed. The Silver Lake sub-
watershed is approximately 38.4 mi² (24,576 acres) and has the largest percentage of
urban/commercial/residential area, approximately 31%, and the smallest portion of
protected lands at 3.7% (Duffield Associates, Inc., February 2009). Projections for future
impervious surface are expected to exceed all other sub-watersheds (Table 2, Introduction).
These statistics support the recommendation to focus initial efforts in the Silver Lake sub-
watershed. Additionally, Duffield found this sub-watershed to have the greatest potential
for water quality improvement based on the number of high-ranking projects found in the
field assessment. Duffield found the top five sites for WMWQ technology opportunities in
the entire Watershed within the Silver Lake sub-watershed, as well as twelve upland sites
with high ranks (Figure 4).
12
Página 19
MONITORING
A monitoring plan helps determine the effectiveness of projects implemented throughout
the watershed by measuring pollutant load reductions and water quality. It also important
to track activities for state, federal, and municipalities reporting associated with water
quality and restoration projects. In the Plan, Duffield outlines a monitoring plan with
several important components for determining success. There are different methods
presented in the Plan by Duffield to track progress based on the source of information.
Timeframes associated with each method should also be considered when identifying
appropriate monitoring techniques. It is important to determine an appropriate measure of
success, preferably based on scientific data versus visual or aesthetic indicators, and
educate members of the public in the same manner (Tyler, 2011). The Watershed should be
reassessed on a regular basis (every 5-7 years) to maintain the most accurate data and
determine if current priorities are inline with pre-established priorities. If new issues arise,
refocusing the Watershed Plan may be necessary (Duffield Associates, Inc., February 2009).
13
Página 20
Table 3. Silver Lake sub-watershed total WMWQ technology scores, ranked highest to lowest.
Screening Categories for WMWQ Technologies SILVER LAKE SUB-WATERSHED SITE IDENTIFICATION NUMBERS
12/1
3 18 16 5 8 1 10 7 14 3 6 15 17 19 2 20 9 11 4
Existing Buffer Width 1 4 1 10 4 2 10 4 1 1 1 1 1 1 2 1 7 0 1
Existing Buffer Length 3 3 6 10 6 3 9 6 3 7 3 3 3 3 3 3 4 3 6
Proposed Buffer Width 10 10 10 10 9 10 9 6 9 9 5 6 9 6 9 5 6 5 5
Areal Buffer Protection 10 10 10 10 10 10 10 8 10 10 8 10 10 10 8 10 10 10 8
Surrounding Topography
Upgradient of Stream 4 3 4 4 4 3 4 3 4 3 4 4 4 4 4 4 4 4 4
Proposed Buffer Type 10 10 10 3 7 8 4 10 10 8 8 10 10 3 8 3 6 3 8
CREATION/RESTORATION
OF UPLAND BUFFERS 38 40 41 47 40 36 46 37 37 38 29 34 37 27 34 26 37 25 32
Soil Types Within
Creation and/or
Restoration Areas 8 8 8 3 8 3 3 3 3 6 3 1 1 1 1 1 3 1 1
Approximate Average
Depth of Excavation 9 10 10 7 9 7 7 8 4 1 4 6 3 4 1 4 4 1 1
Soil Relocation 10 10 10 10 10 10 10 9 10 9 9 10 10 10 9 10 5 10 4
Hydrology 9 9 10 9 9 9 7 9 5 2 5 5 5 5 0 5 7 2 2
Location Within
Watershed 10 10 10 10 10 10 7 10 10 10 7 10 7 10 8 10 7 7 10
14
Página 21
Wetland Type/Size 10 10 6 10 8 10 10 10 10 10 10 6 10 6 6 6 2 6 6
WETLAND/FLOODPLAIN
CREATION AND/OR
RESTORATION 56 57 54 49 54 49 44 49 42 38 38 38 36 36 25 36 28 27 24
Soil Types Within
Creation Area 3 2 3 3 1 3 3 2 3 3 4 4 3 4 4 4 3 4 4
Appoximate Average
Depth of Excavation 9 7 10 6 7 7 7 6 4 1 4 6 4 4 1 4 4 4 4
Soil Relocation 10 10 10 10 10 10 10 9 10 9 10 10 10 10 9 10 5 10 4
Permeability 6 6 6 6 6 7 6 6 7 7 7 7 7 7 7 7 6 7 7
Location Within
Watershed 8 8 8 7 8 8 7 8 8 8 7 8 7 8 10 8 7 7 8
Size/Land Use 8 8 3 8 8 8 3 8 8 8 10 4 8 4 4 4 2 4 4
INFILTRATION 44 41 40 40 40 43 36 39 40 36 42 39 39 37 35 37 27 36 31
Access 7 9 7 7 4 7 9 7 7 7 9 7 6 7 7 7 9 7 7
Ownership 5 2 2 2 2 5 2 2 2 2 2 2 2 2 2 2 5 2 5
Likely Approach 7 7 7 7 7 5 7 7 7 7 7 7 7 7 7 7 3 5 3
Stream Length 6 6 4 10 6 8 6 4 6 8 4 6 6 6 8 6 6 6 2
Location Within
Watershed 6 6 6 5 6 6 5 6 6 6 5 6 5 6 8 6 2 5 6
Level of Impairment 8 7 4 7 10 1 7 10 4 4 10 7 4 4 7 4 4 7 4
STREAM CHANNEL
IMPROVEMENTS 39 37 30 38 35 32 36 36 32 34 37 35 30 32 39 32 29 32 27
Existing Preservation 10 10 10 7 7 7 7 7 10 7 7 10 3 10 7 10 7 7 7
15
Página 22
Potential Disturbance
Risk 10 7 7 5 5 8 5 5 7 8 5 7 0 7 5 7 8 5 5
Potential Preservation 10 4 5 5 4 4 4 5 4 4 4 4 0 4 5 4 5 4 5
Location Within
Watershed 2 4 4 4 7 2 4 7 2 7 6 2 6 4 2 2 8 4 2
PRESERVATION OF
STREAMS, WETLANDS &
BUFFERS 32 25 26 21 23 21 20 24 23 26 22 23 9 25 19 23 28 20 19
Flood Storage Need 6 4 7 7 2 7 4 0 4 2 4 4 7 2 6 2 1 6 7
Storage Potential 3 3 2 4 3 4 3 2 3 1 3 1 3 2 3 2 1 2 1
Approximate Average
Depth of Excavation 4 5 5 3 3 4 3 2 2 1 2 1 3 1 0 1 3 1 1
Location Within
Watershed 5 5 5 3 5 5 3 1 5 5 3 5 3 5 4 5 2 3 4
FLOOD CONTROL 18 17 19 17 13 20 13 5 14 9 12 11 16 10 13 10 7 12 13
21 21 21 20 20 19 19 18 18 18 18 16 16 16 16 15 15 14
TOTAL SCORE
227 7 0 2 5 1 5 0 8 1 0 0 7 7 5 4 6 2 6
16
Página 23
Table 4. Screening factors and scoring criteria for upland site evaluations.
Primary Screening
Description Scoring
Factor
>11.5 lb = 30
Combines total impervious area treated with
4.5 - 11.5 lb = 20
Pounds of TN Removal removal efficiency of proposed retrofit. Will
Expected per Year score the drainage area to the retrofit & removal
1.5 - 4.5 lb = 10
efficiency of BMP
<1.5 lb = 0
<15K = 25
15 - 35K = 16
Cost Total retrofit cost
35 - 95K = 8
>95K = 0
Capture >= 0.25" during 0.5" storm
event of off-site runoff = 10
Capture of off-site Whether any off-site runoff is captured and
Capture >= 0.10" during 0.5" storm
runoff treated
event of off-site runoff = 5
No off-site runoff captured = 0
Practice includes soil absorption
(bioretention), infiltration, or retention
= 20
Ability of practice to reduce overall volume of
Practice includes filtering, runoff
Runoff Reduction runoff through infiltration, absorption, runoff
dispersion, or other practice that
capture & reuse, etc.
provides some runoff reduction = 10
Practice does not include these
features = 0
Whether property has current funding, planning Good chance for quick implementation
process underway where retrofit could fit into = 15
larger project, or located next to a sensitive water
Short-term
body (e.g., Silver Lake), 319 potential, dry pond Potential chance for quick
Implementation
conversion, DelDOT projects (less than 6 months) implementation = 7
Retrofit Reconnaissance Inventory (RRI) does No utility conflicts identified = 4
Few Site & Utility Not at this time = 0
not identify utility conflicts at location of
Constraints
practice Utility conflicts identified = 0
Secondary
Description Scoring
Screening
No Aesthetic,Factor
Nuisance, Practice does not include standing water, No issues identified = 1
Safety Issues mosquito habitat, steep drop-offs, unattractive
nuisances, etc. Issues identified =
Exceptional 0
opportunity =3
Outdoor Learning & Whether practice is strategically located on LID promoted = 3
Moderate opportunity = 2
Promotes innovative Practice promotes the concept of decentralized
Community Outreach property and has design features that would be of
practices/LID runoff treatment and reduction
Opportunities interest to students and community LID not necessarily
Marginal promoted
oppportunity =1 =0
17
No opportunity = 0
Practice contains features = 2
Promotes Bacteria Practice contains filtering, desiccation, or other
Removal processes that can remove bacteria
Practice doesn't contain features = 0
Trees planting included = 1
Página 24
Table 5. Project ranking of Upland sites located in the Silver Lake sub-watershed.
Project Sub-
Rank Municipality Name
ID Watershed
R19c Silver Lake Dover Dover High School
DE Agricultural
R30a Silver Lake Dover
Museum
Carroll's Corner
R48a Silver Lake Dover
Shop Cntr
R31c Silver Lake Dover Legislative Hall
R41a Silver Lake Dover Holy Cross
R19e Silver Lake Dover Dover High School
DE Tech & Comm
R14c Silver Lake Dover College, Terry
Campus
DE Tech & Comm
R14d Silver Lake Dover College, Terry
Campus
R19b Silver Lake Dover Dover High School
Fairview Elementary
High R29c Silver Lake Dover
School
R8a Silver Lake Dover Super Fresh
R34a Silver Lake Dover Schutte Park
N53 Silver Lake Dover Chatham Cove
N56 Silver Lake Dover Silver Mill
N49 Silver Lake Dover Capitol Green 1
Rodney/ May/Cross/
N78 Silver Lake
Wedge
N36 Silver Lake Dover Woodcrest
Lake Club
N52 Silver Lake Dover
Apartments
Woodbrook/Sherwo
N77 Silver Lake Dover
od
N38 Silver Lake Dover Fairview
N55 Silver Lake Dover
Overlook on Silver
18
Página 25
Lake
N54 Silver Lake Dover East Lake Gardens
N11 Silver Lake Dover Baltray
N66 Silver Lake none Hunter's Pointe
State Police
H505 Silver Lake Dover
Station/Museum
Public Works Yard
H510 Silver Lake Dover
(P2)
City Public Works
H506 Silver Lake Dover
Yard
R13a Silver Lake Dover Modern Maturity
R26a Silver Lake Dover Target
William Henry MS /
R22a Silver Lake Dover Booker T
Washington ES
R8b Silver Lake Dover Super Fresh
Med. R19a Silver Lake Dover Dover High School
R26b Silver Lake Dover Target
R106a Silver Lake ?? Taco Bell
R502a Silver Lake Dover Wawa
Dover Central
R23a Silver Lake Dover
Middle School
Fairview Elementary
R29a Silver Lake Dover
School
Carrolls Corner
R48b Silver Lake Dover
Shop. Cntr
Blue Hen Corporate
R64c Silver Lake Dover
Center
Women's Health
Med. R201a Silver Lake Dover
Center
Frear Federal
R530a Silver Lake Dover
Building
R501a Silver Lake Dover US Gas
R64b Silver Lake Dover Blue Hen Corporate
19
Página 26
Center
R101a Silver Lake Dover City Hall
R13b Silver Lake Dover Modern Maturity
Edgehill Shopping
R25b Silver Lake Dover
Center/State Library
R41c Silver Lake Dover Holy Cross
Blue Hen Corporate
R64a Silver Lake Dover
Center
R108a Silver Lake Dover La Tonalteca
State Police
R505b Silver Lake Dover
Museum
R31b Silver Lake Dover Legislative Hall
St Andrews
R500a Silver Lake Dover
Lutheran Church
Edgehill Shopping
R25c Silver Lake Dover
Center/State Library
R105a Silver Lake Dover Burger King
R510a Silver Lake Dover Harvest House
R26c Silver Lake Dover Target
State Police
R505a Silver Lake Dover
Museum
R31a Silver Lake Dover Legislative Hall
Carrolls Corner
R48c Silver Lake Dover
Shopping Center
R41b Silver Lake Dover Holy Cross
McKee Business
R16c Silver Lake Dover
Park
R102a Silver Lake Dover Merrill Lynch
South Dover
R42a Silver Lake Dover
Elementary School
R43a Silver Lake Dover Bay Court Plaza
N1 Silver Lake Dover Mill Creek
20
Página 27
N50 Silver Lake Dover Capitol Green 2
Edgehill/Dover
N51 Silver Lake Dover
Heights
N114 Silver Lake none Capitol Park
N173 Silver Lake none Quails Nest
N4 Silver Lake Dover Maple Dale Retreat
N202 Silver Lake None Meadow Ridge
N3 Silver Lake Dover The Meadows
N60 Silver Lake none Carlisle Village
Elm Terrace & State
N47 Silver Lake Dover
St
N48 Silver Lake Dover Kent Ave
Division St &
N39 Silver Lake Dover
Governors
N63 Silver Lake None Foxhall
H501 Silver Lake Dover US Gas
Cheswold Recycle
H504 Silver Lake none
Center
H502 Silver Lake Dover Wawa
DE Tech & Comm
R14a Silver Lake Dover College, Terry
Campus
R107a Silver Lake Dover Del Taco
R4a Silver Lake Dover Kmart
R10a Silver Lake Dover Golden Corral
Low Proctor & Gamble
R20a Silver Lake Dover
North Building
R27a Silver Lake Dover Dover Mart
DE Tech & Comm
R14b Silver Lake Dover College, Terry
Campus
Proctor & Gamble
R21a Silver Lake Dover
South Building
21
Página 28
R19d Silver Lake Dover Dover High School
R200a Silver Lake none A & H Uniform
R501b Silver Lake Dover US Gas
N2 Silver Lake Dover Maple Glen Dr
N21 Silver Lake none Zurkow Lots
Rt 8 & Sharon Hill
N69 Silver Lake None
Rd
H301 Silver Lake Dover Gas Station/U-Haul
H303 Silver Lake Dover Car Zone
Poors Energy
H503 Silver Lake none
Service
H507 Silver Lake Dover Jiffy Lube
Edgehill Shopping
H508 Silver Lake Dover
Center
H500 Silver Lake Dover Auto Zone
H509 Silver Lake Dover Self Wash/Wax
*Property owners have not been contacted as part of the
preparation of this report.
Sub-Watershed Key
St. Jones
Tidbury Creek
Isaac Branch
Silver Lake
22
Página 29
Table 6. Watershed wide WMWQ scores ranked highest to lowest (Duffield 2008).
Screening Categories for SITE IDENTIFICATION NUMBERS
WMWQ Technologies
12/
18 16 5 8 27 1 10 7 14 26 23 3 6 15 21 22 25 17 19 2 20 9 24 11 4
13
CREATION/RESTORATIO
N OF UPLAND BUFFERS 38 40 41 47 40 38 36 46 37 37 37 40 38 29 34 27 28 33 37 27 34 26 37 28 25 32
WETLAND/FLOODPLAIN
CREATION AND/OR
RESTORATION 56 57 54 49 54 39 49 44 49 42 37 34 38 38 38 38 38 32 36 36 25 36 28 38 27 24
INFILTRATION 44 41 40 40 40 42 43 36 39 40 43 40 36 42 39 40 40 39 39 37 35 37 27 29 36 31
STREAM CHANNEL
IMPROVEMENTS 39 37 30 38 35 33 32 36 36 32 31 33 34 37 35 31 31 31 30 32 39 32 29 22 32 27
PRESERVATION OF
STREAMS, WETLANDS &
BUFFERS 32 25 26 21 23 32 21 20 24 23 24 30 26 22 23 32 26 26 9 25 19 23 28 25 20 19
FLOOD CONTROL 18 17 19 17 13 19 20 13 5 14 14 6 9 12 11 6 10 12 16 10 13 10 7 13 12 13
22 21 21 21 20 20 20 19 19 18 18 18 18 18 18 17 17 17 16 16 16 16 15 15 15
TOTAL SCORE
7 7 0 2 5 3 1 5 0 8 6 3 1 0 0 4 3 3 7 7 5 4 6 5 2 146
* Property owners have not been contacted as part of the preparation for this report. Red numbers are highest technology scores.
Sub-Watershed Key
St. Jones
Tidbury Creek
Isaac Branch
Silver Lake
23
Página 30
Figure 4. Initial recommendation sites for the Silver Lake sub-watershed (Duffield 2008).
24
Página 31
SUB-WATERSHED MANAGEMENT OPPORTUNITIES
INTRODUCTION
With a strategy in place, partners and other organizations have a more focused approach to
improving the quality of the St. Jones Watershed. The Silver Lake sub-watershed strategy
may not fulfill the priorities of every organization and may be limiting for those with
specific objectives. However, the strategy provides direction for future management
opportunities. As part of the “St. Jones Watershed Implementation Plan” (Plan) by Duffield ,
priority lists were developed to target pollution control opportunities within the Silver Lake
sub-watershed. These lists use different strategies such as upland sites, Watershed
Management for Water Quality (WMWQ) technologies, neighborhoods, hotspots, and
preservation to identify target projects. The lists developed by the Plan are a place to begin
efforts. It is not meant to be implemented strictly in chronological order, but instead used
as a guide for watershed improvement activities that ultimately depend on partner
cooperation and funding availability.
The lists below provide an overview of the current efforts occurring in the Silver Lake sub-
watershed to improve water quality. These projects, identified either before or recently
after the Plan was written, were chosen based on landowner and partner cooperation and
willingness to collaborate on the proposed improvement projects. The site name and
identification code are listed next to those sites identified in the Plan’s list of potential
upland sites. The Plan provides useful cost estimates of Best Management Practices (BMP)
identified for individual upland projects that may help with decisions with budgets.
Another useful tool is the expected pollutant removal by each BMP and the associated costs,
therefore providing the cost effectiveness of each project. Common storm water BMP and
their associated nutrient removal rate are presented in Table 7.
WMWQ technologies are also listed in the Plan and show a great deal of potential. The
WMWQ technologies are a reflection of the specific types of pollution control measures
identified by the St Jones Tributary Action Team (TAT) in the Pollution Control Strategy
(PCS Addendum 1) to improve water quality within the watershed. These projects are
typically larger scale and require more land area, space, and most importantly, participation
from private landowners. The benefits, however, are just as successful as upland/urban
retrofits as they occur mostly in the headwaters of the Watershed and sub-watersheds.
Planners and land managers should reference this strategy and the Plan for guidance on
future project planning.
25
Página 32
Table 7. BMP Percent Reduction of Nutrients from Urban Runoff
BMP Total Nitrogen (%) Total Phosphorous
(%)
Stormwater Wet Ponds 40 50
Sand Filter 47 41
Stormwater Dry Ponds 15 25
Stormwater Wetlands 30 49
Infiltration Practices 65 70
Water Quality Swales 25 34
Rain Garden 43 81
SILVER LAKE SUB-WATERSHED PROJECTS
CURRENT PROJECTS
1. Dover High School. Located at Walker Road and Patrick Lynn Drive in Dover, DE, the
high school campus would benefit from better stormwater infiltration practices. URS
Corp. has submitted a proposal for design and conceptual work for the site. Several
ideas were proposed, and after site visits, design consultations, and meetings with
school personnel, the following projects were designated as the best options:
construction of a rain garden to collect stormwater runoff from the parking lot
surface;
restoring function and prevent erosion to the discharge area in the unnamed
channel;
increasing water volume entering the wetland/storage area in the existing
stormwater wetland to improve nutrient removal.
The rain garden alone will prevent 5 pounds of nitrogen, 0.5 pound each of phosphorus
and zinc, and 275 lbs of sediment per year from entering Silver Lake. The pollutant load
reduction for the stormwater wetland retrofit is yet to be determined, but should be
26
Página 33
comparable to the previous reductions, if not more. Reference in Duffield: Site Name:
R19 – Dover High School.
2. Delaware Agricultural Museum and Village. Located off of Rt. 13 southbound in Dover,
DE, the Agricultural Museum and Village (Museum) property was identified in the
Duffield report for a conversion of a dry pond to a bioswale. The dry pond conversion,
in addition to other enhancements, has recently been completed with funds primarily
from the Clean Water Advisory Council’s Community grant. Plans to convert it to a
bioswale and re-grade adjacent land to direct water flow away from Museum buildings
and towards the bioswale have recently been completed. Two rain gardens, on either
side of the Museum entrance, collect almost half of the stormwater runoff from the roof
where it previously was discharged onto mowed grass. Additionally, a 10-foot buffer
encircling three sides of Mill pond was planted to discourage Canada geese from nesting
and traversing between the pond and land. Six floating wetlands, a new technique used
to improve the water quality, were launched in Mill pond. Water samples were
collected to monitor the effect floating wetlands had on phosphorus, nitrogen, and
bacteria removal. Fencing was installed along the Silver Lake shoreline on Museum
property to reduce the number of geese entering the property via Silver Lake. The
bioswale is estimated to remove 1 pound each of phosphorus and zinc, 7.5 pounds of
nitrogen, and 500 pounds of sediment per year. Each rain garden is estimated to reduce
phosphorus and nitrogen by 45%, zinc by 80% and sediment by 60%. The removal of
nutrients and bacteria from the Mill pond due to the floating wetlands and vegetated
buffer are still being monitored through water sample analyses, but are expected to
reduce bacteria significantly. Reference in Duffield: Site Name: R30 – DE Agricultural
Museum.
27
Página 34
3. Delaware Technical and Community College. Located at Scarborough Road and Route
13 in Dover, DE. The Technical and Community College’s campus offers an opportunity
to work with students and officials to create a stormwater management and
sustainability plan that will address the College’s future needs of expansion while
maintaining and enhancing stormwater infiltration and bioretention practices. Cost
estimates are currently being determined for potential projects including: several rain
gardens, converting a tax ditch to a bioswale, step pool conversion, and re-grading areas
to collect more water for treatment before entering the storm drain system untreated.
All project combined would remove approximately 4.25 pounds of phosphorus, 37
pounds of nitrogen, 3.6 pounds of zinc, and 3,502 pounds of sediment per year from
entering Silver Lake. Reference in Duffield: Site Name: R14 - DE Technical &
Community College, Terry Campus.
28
Página 35
4. Fairview Elementary School. Located at the intersection of Walker Rd and Pear St in
Dover, DE. The principal at Fairview Elementary school has agreed to disconnect
several downspouts to construct a large rain garden near the building where students
and faculty pass by regularly. Education on rain gardens and stormwater runoff will be
incorporated into lesson plans and will continue even after construction ends. In
addition, the rain gardens will remove 0.5 pound of phosphorus, 3.75 pounds of
nitrogen, 0.5 pound of zinc, and 250 pounds of sediment per year from stormwater
runoff. Reference in Duffield: Site Name: R29 – Fairview Elementary.
5. Silver Lake Park. Located adjacent and south of the Silver Lake dam with parking off of
Washington Street and Lewis Mill Drive in Dover, DE. As part of a cooperative effort
amongst DNREC’s Watershed Assessment Section, 319 Nonpoint Source Program,
Division of Parks and Recreation, DELDOT’s Environmental Program, City of Dover’s
29
Página 36
Silver Lake Commission, and Polytech High School the Silver Lake Park Revitalization
Plan was developed to improve water quality in the St. Jones River while improving the
aesthetic value of the river to Dover residents and park visitors. Comments from Dover
residents and members of the public were incorporated as much as possible to ensure
the park would still serve the needs of its primary stakeholders. Several key projects
were identified and broken down into four implementation phases (Figure 5). Each
phase included a plan to establish riparian buffer along the river in a tiered system that
incorporates grasses and trees and can reduce sediments up to 96%, nitrogen up to
95% and phosphorus up to 79% (www.nrcs.usda.gov/NRCSProg.html). Phase 1 of the
Revitalization Plan is almost complete with the northern portion’s riparian buffer
complete, but still lacking park benches and educational and interpretive signage. The
southern portion of Phase 1 is currently on hold until other phases are closer to
completion. DNREC hired Biohabitats Inc. to develop the design of Phase 2, including
the discharge received by Washington Street in the drainage ditch adjacent to the park
that empties to the St. Jones River. After extensive surveying and planning, Biohabitats
created several options to choose from for the stabilization and restoration of the St.
Jones River near the dam. Shortly after, a public meeting was held in conjunction with
DNREC, City of Dover, Silver Lake Commission and Biohabitats to determine the final
design based on public input received during the meeting. The figure below is a detailed
sketch of the proposed design of the work to be done along the east side of the River and
park. The Mill Race, or wetland slough as identified in the sketch below, was added
later to address the excessively wet “island” area (Figure 6). During field review, the
required permitting agencies determined the design would need to be revised slightly to
meet state and federal standards. Permits for this project were received at the end of
February 2011 and bidding for construction is currently underway. Design plans are
currently being completed for Phase 3 in conjunction with partners from the City of
Dover and Kent County Parks & Recreation and will be planted in the Fall 2011.
Portions of Phase 4 have been completed with help from the City of Dover, Kent County
Parks & Recreation, Elizabeth Murphey School, and Central Middle School (see “Partner
Projects” listed below for more information). Other projects are in development and
will address storm water runoff and connect the riparian corridor (see DNREC Richards
& Robinson’s property, Figure 7).
30
Página 37
Figure 5. Silver Lake Park Revitalization Plan with Phases 1-4 identified.
31
Página 38
Figure 6. Biohabitats rendition of the proposed restoration and stabilization along the
St. Jones River.
6. Washington Street. Storm water runoff exiting from Washington Street in Dover, DE,
the entrance road to the beach side of Silver Lake Park, is currently discharging
untreated directly into the St. Jones River. Plans for a regenerative step pool
conveyance system are currently under way and should be completed in conjunction
with Phase 2 of the Silver Lake Park Revitalization Plan. The step pool system is
projected to reduce Nitrogen and Phosphorus by 45% and sediment by 60% from the
stormwater that currently drains from the approximately 17 acres of adjacent land.
Using a common loading rate for the Dover area, reductions using this technology for
the said acreage of land are estimated to remove 121.7 pounds of Nitrogen, 16.5 pounds
of Phosphorus, and 8500 pounds of sediment per year.
32
Página 39
7. DNREC Richards & Robinson’s property. Located in downtown Dover, DE at 89 Kings
Highway. Storm water runoff from this parcel is currently draining to Mirror Lake
untreated. As part of DNREC’s environmental improvement plan, storm water runoff
will be directed through a series of storm water BMP’s while an increase in riparian
buffer width will also help remove pollutants from entering Mirror Lake. This plan will
also attempt to address the sediment bar and associated contaminants found in Mirror
Lake at low tide. Residents and scientists will work together to develop a solution. See
“Mirror Lake: Analysis of Chemical Contaminants in Sediments,” 2011 and the DNREC
“Environmental Improvement Plans for Selected DNREC Office Sites,” 2011 for more
detailed information.
Figure 7. DNREC Richardson & Robbins property and the proposed environmental improvements
adjacent to the St. Jones River
33
Página 40
PARTNER PROJECTS
8. Elizabeth Murphey School. Located on the north side of East Division Street and west of
the St. Jones River in Dover, DE. This area is located directly across from the riparian
buffer planted in Phase 1 of the Silver Lake Park Revitalization Plan. The low-lying land
adjacent to the river was being mowed all the way to the edge of the river and
experienced frequent ponding or flooding during heavy rainfall. The shoreline was
severely eroded from human and animal traffic as well as water velocity in the river. In
the spring and fall of 2010, partners from Kent County Parks and Recreation, City of
Dover, and DNREC established a tiered riparian buffer and approximately 120 linear
feet of “living shoreline” consisting of biocoir logs and vegetating the backfilled soil
medium.
9. Central Middle School. Located on the north side of East Division Street and the
Elizabeth Murphey School and west of the St. Jones River in Dover, DE. The area
surrounding part of the St. Jones River that flows from the dam on the south side of
Silver Lake (Park) to the intersection of Loockerman Street at Mirror Lake is a widely
used area. Currently, the grassed area between the school and the River is mowed
almost directly to the bank. The partial wooded area of the project has extensive areas
of invasive species (Japanese honeysuckle, English ivy, Phragmites, Virginai creeper,
Trumpet Crepper, Porcelain berry, Autumn Olive, tree of Heaven, Multiflora rose, and
Privet). The invasive plants will be removed and sprayed with the help Delaware
Division of Parks and Recreation before the buffer is planted with native species. In
addition, an outdoor classroom will be created using recycled tire (semi-permeable)
flooring area creating a seating/classroom area. Students, in accordance with 7th grade
science curriculum, will test water quality annually in order to determine the health of
our local Silver Lake/St. Jones watershed. Additionally, students will use digital
photography to meet further Science standards. A tiered riparian buffer system, which
incorporates grasses and trees, can reduce sediments up to 96%, nitrogen up to 95%
and phosphorus up to 79%.
34
Página 41
10. Natural Resource Conservation Service (NRCS) building. Located off of College Park
Drive in Dover, DE. In 2010, partners from the Partnership for the Delaware Estuary,
NRCS, and Environmental Concern designed and installed a rain garden to collect runoff
from the adjacent parking lot and roof. Using help from students of North Dover
Elementary school, the rain garden was planted with 600 native plants to treat storm
water runoff before it enters the river system untreated.
11. Silver Lake Dam stabilization. The City of Dover’s Emergency Management Division
complied with the insurance agency overseeing the Silver Lake dam by making
necessary improvements. These improvements included vegetating either side of the
dam’s northern portion and fencing it off to prevent damage from waterfowl of park
visitors. Large rip rap was also installed to reduce the any additional erosion along the
banks due to wave action, foot traffic, and wildlife use. As a result, these improvements
will discourage foot traffic to vulnerable areas and improve the safety and
environmental integrity of the structure and surrounding area.
35
Página 42
ii. Education and Outreach
i) Rain Gardens for the Bays. EPA Region 3 initiative to reduce storm water runoff
entering “our bays” including the Delaware Bay, Delaware’s Inland Bays, and Maryland’s
Coastal Bays by installing rain gardens in the Bays’ watersheds. To date, three rain
gardens exist in the St. Jones Watershed, including 2 at the Delaware Agricultural
Museum, 1 at the Natural Resource Conservation Services (NRCS) office off of College
Park Dr. and 1 at Fairview Elementary School with assistance from the Partnership for
the Delaware Estuary.
ii) Fertilizer Campaign. Marketed as “Livable Lawns,” this campaign targets landscaping
companies and homeowners that apply fertilizer to lawns. The campaign aims to
educate homeowners and landscape professionals about the consequences of excessive
fertilizer use and fertilizer alternatives while ultimately reducing the amount of excess
nutrients reaching Delaware waterways.
FUTURE OUTLOOK OF THE SILVER LAKE SUB-WATERSHED
The St. Jones Tributary Action Team (TAT) developed recommendations to reduce non-point
source nutrient and bacteria loads to the St. Jones Watershed in order to meet the 2006 Total
Maximum Daily Load (TMDL) as established by the Environmental Protection Agency (EPA).
Through extensive education and discussion, the St. Jones TAT developed recommendations for
open space, stormwater, wastewater, agriculture, and education. These recommendations were
submitted in the form of a Pollution Control Strategy (PCS) to then-Secretary of DNREC, John
Hughes. The St. Jones PCS is currently being finalized and will be submitted to EPA shortly
thereafter. The document is an excellent resource for a citizen perspective of important issues
related to improving the water quality of the St. Jones Watershed.
Within the storm water section of the St. Jones PCS, the TAT recommends implementing a storm
water utility to generate a stable source of funding for storm water management throughout the
watershed. Governor Minner’s Task Force on Surface Water Management quantified the statewide
financial need for stormwater management. “The Finance Subcommittee identified stormwater
capital requirements of $207.3 million over the next five years and projected annual maintenance
36
Página 43
requirements of $13.73 million” (URS Corporation, 2009). The Task Force thus recommended that a
stormwater utility operating at the county or local level should be formed as a funding vehicle for
the purpose of providing a simplified and comprehensive approach to drainage and flooding
problems. A stormwater utility is an approach that can generate a stable source of funding for
stormwater management within the region. The funds are made available by collecting user fees.
Stormwater utility fees are generally set by the amount of impervious cover on each resident’s
property. The higher the impervious cover the higher the fee. GIS mapping will be utilized to
measure impervious surface generated by residential and commercial development, and the utility
fee will be charged based on the property’s Equivalent Residential Unit (ERU). In fall 2011,
members of the City of Dover’s Council will be invited to participate in a tour of existing stormwater
structures throughout the City and entire Watershed to examine the costs associated with
maintaining quality facilities.
There are many benefits of a stormwater utility. According to DNREC, Division of Watershed
Stewardship, Watershed Assessment Section, a stormwater utility can generate up to $10 per capita
per $1/month/ERU. It is estimated that approximately one-eighth to one-sixth of the annual
revenue from a $1/month/ERU stormwater utility results in approximately $30,000--$40,000 for
cities and approximately $180,000--$250,000 for counties (Christina Tributary Action Team and
Water Resources Agency, 2007). The revenue generated from the utility can be used to fund a
variety of stormwater management and water quality programs. This tool can be used in the St.
Jones Watershed to contribute to the reduction of nutrients and bacteria reaching the rivers and
streams by implementing best management practices with the funds generated from the
stormwater utility.
Efficient implementation of best management practices and water quality improvement projects
depend largely on staff resources. It is suggested that the stormwater utility be used to fund a staff
position/Watershed Coordinator dedicated to managing and implementing the projects throughout
the St. Jones Watershed. New projects will require researching appropriate funding and attention
to detail during design and engineering phases. Stable funding for a Watershed Coordinator
becomes more important when completing multi-phased or long-term projects. Also, creating an
established position will allow the Watershed Coordinator to create and maintain local contacts,
thereby generating support and resources for future projects.
The Sediment and Stormwater regulations serve as an enabling structure for the local ordinances
needed in order to set up the utility. For example, the City of Wilmington has established a
stormwater utility for residential and commercial customers in the municipality where all
properties pay a stormwater charge based on their impervious cover.
Before funding even becomes available, potential projects should already be identified in a priority
list. Once funding does become available the process will move much quicker and smoother if all
research and cost-estimates are completed ahead of time. During the course of current project
37
Página 44
implementation by the St. Jones Watershed Coordinator and partners, a list of potential projects
have surfaced through both the Plan and amicable partnerships developed with landowners,
businesses, and partners. The following are projects currently being researched for further
potential as a stormwater improvement project:
Site Location Description of project Landscape Duffield
position priority
Super Fresh Dover, Silver Convert existing dry Headwaters High
Lake Sub- pond to large, passive
watershed bioretention.
Modern Dover, Silver Convert dry pond to Headwaters Medium
Maturity Center Lake Sub- bioretention
watershed
Behind Dover Dover, Silver Regenerative Adjacent to Unlisted *
Pools & Ag Lake Sub- stormwater conveyance Lake
Museum watershed system
Winding Creek Dover, Silver Potential for Headwaters; Duffield
DE, LLC Lake Sub- wetland/floodplain confluence of WMWQ
watershed creation and/or Maidstone & Project #
restoration, stormwater Penrose 12/13
infiltration, stream Branches
channel improvements,
preservation, and flood
control.
Private Dover, Silver Potential for Headwaters; Duffield
Landowner Lake Sub- wetland/floodplain adjacent to WMWQ
watershed creation and/or Cahoon Project #
restoration, stormwater Branch 18
infiltration, stream
channel improvements,
and flood control.
* Untreated stormwater discharge into Silver Lake behind Delaware Agricultural Museum
& Village and Dover Pools. Identified while completing BMPs on the Ag Museum property.
Developed a positive relationship with staff at the Ag Museum.
Outside funding sources may help supplement or extend the life of funds generated by the
stormwater utility. Partnering with other organizations (state, county, and municipal agencies,
non-profits, etc.) help leverage funds and promote productive and successful partnerships.
Funding sources used in the past include: Delaware’s Clean Water Advisory Council’s Community
38
Página 45
Water Quality Improvement Grant, 319 Non-Point Source grant, Delaware Land and Water
Conservation Trust Fund Trail Grant, and Community Environmental Project Fund (penalty funds).
New funding sources may arise and should be explored. Also, some funding sources are better
suited for certain projects than others. It is important to apply for the grant that most
appropriately fits the objectives and goals of each project.
39
Página 46
WORKS CITED
Christina Tributary Action Team and Water Resources Agency. (2007). The Christina Basin
Pollution Control Strategy. Dover: DNREC.
Division of Soil and Water Conservation. (n.d.). Improving Silver Lake: Forebay Project.
Dover, DE, USA: Delaware Department of Natural Resources and Environmental
Control.
DNREC. (April 2010). Combined Watershed Assessment Report (305(b)) and Determination
for the Clean Water Act Section 303(d) List of Waters Needing TMDLs. Dover:
Delaware Department of Natural Resources and Environmental Control.
DNREC, City of Dover, and Advisory Committee. (1996). Options for Protection and
Improvement of Silver Lake. Dover: DNREC.
Dover, C. o. (1990, August 27). Proposed Resolution-Silver Lake Commission. Dover, DE,
USA.
Duffield Associates, Inc. (February 2009). St. Jones River Watershed Implementation Plan.
Wilmington: Duffield Associates, Inc.
Duffield Associates, Inc. (October 2008). St. Jones River Watershed Pollution Control
Opportunities: Technical Memorandum. Wilmington: Duffield Associates.
Edgell, D. (2011, January). Planner, former Silver Lake Commission President. (L. Allison,
Interviewer)
F.X. Browne. (1988). Phase 1: Diagnostic-Feasability study of Silver Lake. Dover: F.X. Browne.
Greene, R. (2011, January). Engineer. (L. Allison, Interviewer)
Rogerson, A. B., Jacobs, A. D., & Howard, A. M. (2010). Wetland condition of the St. Jones River
Watershed. Dover: Delaware Department of Natural Resources and Environmental
Control.
Shaffer, E. (1989). Technical Background Report. Dover: Delaware Department of Natural
Resources and Environmental Control.
Tyler, R. (2011, January). Environmental Scientist, DNREC. (L. Allison, Interviewer)
URS Corporation. (2009). Kent County Level of Service Analysis of Surface Water Management
Needs. URS Corporation.