Paj 1

UTILITY COMMITTEE The Utility Committee Meeting was held on June 9, 2014 at 6:01 p.m. with Chairwoman Williams presiding. Members present were Mr. Perza (arrived 6:02 p.m.), Mr. Slavin, Mr. Blakeman, and Mr. Snaman. Councilmen Dixon and Hutchison (arrived at 6:13 p.m.) were also present. AGENDA ADDITIONS/DELETIONS Mr. Blakeman moved for approval of the agenda as presented, seconded by Mr. Snaman and unanimously carried. Annual Engineering Consultant's Report on the Operation and Maintenance of the Electric System - Fiscal Year 2013 Mrs. Donna Mitchell, Controller/Treasurer, reviewed the conclusions of the Annual Engineering Consultant’s Report on the Operation and Maintenance of the Electric System - Fiscal Year 2013. Referring to Table 4-2: Annual Revenues and Sales Ratios on Page 4-4, Mr. Blakeman noted that revenues were $99,513,156 in FY 2011 and $88,331,196 in FY 2013, and he expressed concern about this $11M reduction in revenue. He indicated that the forecast for the current year was approximately $76M, which would be another $12M reduction, and inquired if this would be a continuing trend. Mrs. Mitchell explained that this was the result of decreases in the power supply cost and that the City had reduced rates in the last two (2) years by approximately 20%. She noted that higher-priced hedges in earlier years had now ended and noted that rates were based on rate studies performed by Burns & McDonnell that took into consideration the cost of services. Referencing Table 4-2, Mr. Blakeman also observed that the residential rate was reduced from $0.1479/kWh to $0.1400 over a three (3) year period, which he felt was a small reduction compared to the reduction in non-residential rates, which had decreased by one (1) cent or more during this period. He questioned if customers were reaping the benefit of more efficient operation of the system. Mrs. Mitchell explained that the rates were based on allocations determined by the cost of service. She stated that residential use accounts for more of the cost of service, noting that nearly all of the distribution is to residential users. Mrs. Williams noted that the historic tenacity of the Electric Fund was beginning to wane a bit and that the City would probably make up the difference in the Water Fund. Mr. Slavin moved to recommend acceptance of the report as presented, seconded by Mr. Blakeman and unanimously carried. (City Clerk’s Office Note: Following the meeting, it was determined that the Annual Engineering Consultant’s Report on the Operation and Maintenance of the Electric System Fiscal Year 2013 did not include updated information. Mrs. Donna Mitchell, Controller/ Treasurer, subsequently provided a revised report (Attachment #1). TEA/NAES Report (April) The TEA/NAES Monthly Report for April 2014 was provided to members to enable them to monitor electric sales and revenues received, which will provide a better understanding of any fluctuations that occur and allow the opportunity to make improvements if deemed necessary.

Paj 2

UTILITY COMMITTEE MEETING OF JUNE 9, 2014 PAGE 2 Referring to the Power Supply Summary on Page 1, Mr. Scott Koenig, City Manager, explained that overall power supply costs for April 2014 were $267,987 under budget and that this was one (1) of the few times that the City had been under budget for this component of the power cost. He reminded members that the City had experienced difficulty with some of the PJM charges earlier in the fiscal year; however, these charges had now stabilized. In January 2014, the City spent considerably more on the cost of power than anticipated during the budget preparation; however, it was hoped that these costs would track relatively well entering into the FY 15 budget. Prior to this year, there were a number of extremely high cost hedges and the City’s actual costs for power supply had tracked consistently below the budget. Mr. Koenig noted that the budget for the current year had been revised and was tracking much “tighter.” In reference to the April 2014 Power Supply Sources on Page 2 of the report, Mr. Koenig explained that hedge purchases accounted for 79% of the load, the City was in the spot market or day ahead market for 17%, and the Dover Sun Park provided 4% of the City’s power. Referring to the YTD Variance Report, Page 12, he noted that Total - Utilities Cost reflected that these costs exceeded the target by $6,774,576, which was related to very high PJM charges in January. However, he noted that this was allowed for in the budget and staff believed that these costs would be under control in FY 15. Referring to the Capital Improvement Projects (CIP), Page 23, Mr. Koenig stated that NAES seemed to be progressing well through the projects, and noted that the spring outage was complete. He stated that work had been performed on the turbines which involved extra costs associated with their inspection and eventual replacement in the PJM; however, all units were available for operation after the spring outage and were expected to produce when necessary for the PJM. Mr. Blakeman questioned why the actual Hedged Cost and Unhedged Costs ($/MWh) reflected on Page 2 varied from the budgeted costs, since these costs should be known when the budget is developed. Responding, Mr. Koenig explained that the City’s program states that the City should be 80% hedged on July 1, 2014 for FY 2015; therefore, the cost of 80% of the projected power load should be known. The other 20% is purchased from the market or is related to the Dover Sun Park. At the beginning of the fiscal year, these costs are relatively known. But the hedge position for the out-years is less than 80% because the City does not get up to full 80% hedge until it is coming into the power year. Mr. Koenig explained that the total budget includes the amounts anticipated for the unhedged costs. Mrs. Mitchell further explained that the variance between the $55.67 budgeted hedged cost and the actual hedged cost of $47.91 was the result of the unhedged portion of the power supply and reflected cost reductions in the market. She stated that staff would research the variance in the unhedged energy cost between the budgeted amount of $38.93 and the actual amount of $6.10. Mrs. Williams noted that it was difficult for civilian and elected officials to understand hedged funds and requested that a workshop be provided to members on this topic. She stated her preference that this meeting be scheduled for late in the afternoon (approximately 3:00 p.m. or 4:00 p.m.). Mr. Koenig noted that the City’s contact for The Energy Authority meets with staff each month on a Thursday and suggested that a workshop could be scheduled to follow this monthly meeting.

Paj 3

UTILITY COMMITTEE MEETING OF JUNE 9, 2014 PAGE 3 Mr. Blakeman moved to accept the report, seconded by Mr. Snaman and unanimously carried. Updates Garrison Oak Technical Park Project Updates Mr. Scott Koenig provided updates on the Garrison Oak Technical Park projects, as follows: City Infrastructure Mr. Koenig stated that City infrastructure contracts were underway at the Garrison Oak Technology Park. A-Del Construction Company had been doing a significant amount of earthwork associated with stormwater management as it ties into the White Oak Tax Ditch. George & Lynch, Inc. was constructing the force main, had done the directional bore underneath Route 1 as well as some additional directional bores under the White Oak Tax Ditch, and was in the process of connecting various components of the force main. He indicated that a field construction issue had arisen adjacent to Baytree and the contractor was working to ensure that the force main could fit between other utilities. Mr. Koenig stated that excavation work for the wet well at the pump station was expected to begin shortly. Delivery of some of the stormwater structures had begun. Staff had been working with Chicago Bridge and Iron (CB&I), who would be constructing the water tower, and a mobilization date would be established with this contractor. Calpine Energy Center Mr. Koenig informed members that a number of deliveries were occurring every day to the Calpine Energy Center. The first unit at the Energy Center was well underway, and much of the outside of the unit had been assembled, although a good deal of related piping had yet to be completed. The right-of-way was being cleared of trees for the contractors to run a radial line from the Energy Center back to the 230kV Cartanza Substation. It was Mr. Koenig’s understanding that pole line construction would begin in the next 30 to 60 days and that a good deal of work was taking place at the back of the substation to make necessary improvements for the connection to the grid. Mr. Koenig advised members that a significant amount of activity was taking place at the Garrison Oak Technical Park, including a “kickoff ceremony” that was held in the last 30 days for the Uzin Utz manufacturing facility, which will be constructed on the west side of the Garrison Farm. Approximately 300 construction workers were expected to be associated with the Garrison Energy Center and approximately 30-40 (or more) construction workers with the Uzin Utz property once the steel assembly occurs. Once up and running, City contracts related to infrastructure improvements would involve approximately 20-50 workers, depending on the particular trades that are underway. Mr. Koenig stated that the only contracts that had not been let so far had to do with the relocation of the 69kV electric line on the roadway, and those were expected to be bid out shortly and would be brought forward to Council. This line would start on the east side of the property and involve pole adjustment across the frontage of the Garrison property. Mr. Koenig stated that activities were converging on the date of June 1, 2015, when Calpine expected to be operational in the PJM, and the Uzin Utz facility was tracking along the same lines. It was hoped that the infrastructure and all City projects would be substantially complete by December 31, 2014. Testing for Calpine would occur in February or March 2015, and this date would be in line with the time that the City expected to have staff on line at the Water Treatment Plant to help buffer the impact on the City’s system. Philip Utz, from Uzin Utz, indicated that he

Paj 4

UTILITY COMMITTEE MEETING OF JUNE 9, 2014 PAGE 4 hoped to have the outside of the facility constructed by the end of the year and to put equipment in early next year, with the expectation that manufacturing operations would begin in the June timeframe. Mr. Koenig stated that the projects all seemed to be tracking correctly and staff was actively marketing the balance of the property. He expressed that, from a marketing standpoint, interest had increased now that there was construction activity and infrastructure, and staff was hopeful that one (1) or two (2) additional tenants would be realized this year. Responding to Mr. Blakeman regarding the status of the gas pipeline, Mr. Koenig stated his understanding that line construction was on track, and almost all of the pipe in the area from Leipsic Road going back behind Dover Downs was in place and had been tested. It was his recollection from a conference call with Calpine, that the pipeline was approximately half complete. The right-of-way along the back of Wild Meadows had been cleared, and it was Mr. Koenig’s belief that the line had been dug through this area, but he was unsure if it had yet reached the Calpine property. He stated that this project was moving very smoothly. He stated that his office had not received complaints from residents or motorists. After driving through Wild Meadows a couple of times, he felt that the visual impact of the clearing was not as intense as he anticipated and some trees were left between the houses and the actual right-of-way as a buffer. In response to Mr. Hutchison, Mr. Koenig stated that the target completion date for the gas line was the end of 2014, if not sooner, and that the lateral line would be 16 inches in diameter. Dover Sun Park Members reviewed the Electric Revenue Fund FY14 White Oak Solar Park Incremental Cost. Progress Update on Purchase Power Agreement Mr. Scott Koenig, City Manager, advised members that Mr. Kirk Betts, the City’s Utility Attorney, had been working with a specific contact at Calpine to bring forward a purchase power agreement. A number of iterations had gone back and forth to determine the economic value of power going forward. Mr. Betts was not prepared to bring information forward at this time, and it was hoped that he would be closer to obtaining a number that he believed should be brought forward to Council in this regard within the coming weeks. Discussions were continuing about closing the gap between what the City believed was reasonable and what Calpine believed was reasonable. Mr. Koenig indicated that a draft agreement would come before Council, likely in Executive Session since this would be a legal matter, and would be voted upon in a public session. Responding to Mr. Blakeman, Mr. Koenig stated that staff had not participated in negotiations to this point, and that Mr. Betts and the “number crunchers” from The Energy Authority (TEA) had been passing numbers back and forth. He stated that it was likely that he, Mrs. Mitchell, Mr. Betts, and other key individuals would be included. Mr. Blakeman suggested that if there was someone on staff who would be dealing with this matter on a daily basis, this staff member should be included in negotiations as well. In response to Mrs. Williams, Mrs. Mitchell stated that $100,000 was budgeted in the Electric Fund budget for RFP and contract negotiations in FY 14 and $100,000 in FY 15 because the City was also negotiating with NAES.

Paj 5

UTILITY COMMITTEE MEETING OF JUNE 9, 2014 PAGE 5 Mr. Blakeman moved for adjournment, seconded by Mr. Snaman and unanimously carried. Meeting adjourned at 6:31 p.m. Beverly C. Williams Chair BCW/TM/js/dd S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Minutes\2014\06-09-2014 UTILITY.wpd Attachment Attachment #1 - Revised Annual Engineering Consultant’s Report on the Operation and Maintenance of the Electric System - FY 2013

Paj 6

ATTACHMENT #1 Utility Committee Meeting of 06/09/2014 Annual Engineering Consultant’s Report on the Operation and Maintenance of the Electric System Fiscal Year 2013 City of Dover, Delaware Project No. 78609 June 2014

Paj 7

Annual Engineering Consultant’s Report on the Operation and Maintenance of the Electric System Fiscal Year 2013 prepared for City of Dover, Delaware Dover, Delaware June 2014 Project No. 78609 prepared by Burns & McDonnell Engineering Company, Inc. Missouri City, Missouri COPYRIGHT © 2014 BURNS & McDONNELL ENGINEERING COMPANY, INC.

Paj 8

June 10, 2014 Ms. Donna S. Mitchell, CPA Controller/Treasurer City of Dover 5 East Reed Street Weyandt Hall, Suite 300 Dover, Delaware 19901 RE: Annual Engineering Consultant’s Report Project No. 78609 Dear Ms. Mitchell: In compliance with the requirements of Section 705 and Section 504 of the City of Dover, Delaware Resolution Authorizing and Securing Electric Revenue Bonds, adopted December 23, 1985 (Resolution), Burns & McDonnell submits this Annual Engineering Consultant’s Report for the fiscal year ended June 30, 2013. This report summarizes our review and assessment of the City of Dover’s (City) Electric System, its existing retail electric rates, its insurance coverage in effect, and its reserve funds. Financial, statistical, and operating data used in preparing the report were initially reported in the City’s annual financial statements and accounting records. Additional information was furnished by City and Electric Division staff. In the preparation of this Engineering Consultant’s Report, Burns & McDonnell completed assessments of the electric generating stations and the transmission and distribution system of the City’s Electric Division. Assessments involved interviews, observations, and review of fiscal year 2013 expenditures and fiscal year 2014 budgets. In addition, an analysis of the balances of the Improvement and Extension Fund as well as other funds supporting the Electric Division was performed. Burns & McDonnell also reviewed the adequacy of revenues provided by current retail rates in relation to the requirements of the Resolution. Finally, a high-level assessment of the City’s insurance coverage related to the Electric Division was completed. Based on these reviews and assessments, it is the opinion of Burns & McDonnell that the Electric System is being operated and maintained, including replacements and upgrades as appropriate, in a manner that is consistent with current electric utility practices. In addition, the current retail rates have provided sufficient revenues to satisfy the debt service coverage requirement in the Resolution. Further, it is the opinion of Burns & McDonnell that the balances in the various reserve funds maintained by the City for the Electric Division are sufficient for their intended purposes. 9400 Ward Parkway • Kansas City, MO 64114-3319 Tel: 816 333-9400 • Fax: 816 333-3690 • www.burnsmcd.com

Paj 9

We appreciate the cooperation and assistance provided by the City and the Electric Division staff in the preparation of this report. We will be happy to discuss the report with you at your convenience. Sincerely, BURNS & McDONNELL Ted J. Kelly Principal & Senior Project Manager Business & Technology Services TJK/pcf

Paj 10

2014 Engineering Consultant’s Report Table of Contents TABLE OF CONTENTS Page No. 1.0 EXECUTIVE SUMMARY ................................................................................... 1-1 1.1 Introduction .......................................................................................................... 1-1 1.2 Electric System Overview and Assessment ......................................................... 1-1 1.2.1 General Plant ......................................................................................... 1-2 1.2.2 Production Plant .................................................................................... 1-2 1.2.3 Transmission and Distribution Plant ..................................................... 1-3 1.3 Financial Assessment ........................................................................................... 1-3 1.4 Conclusions .......................................................................................................... 1-5 2.0 INTRODUCTION ............................................................................................... 2-1 2.1 Purpose of Report ................................................................................................ 2-1 2.2 Organization ......................................................................................................... 2-2 3.0 ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT .................................. 3-1 3.1 Electric System Overview.................................................................................... 3-1 3.1.1 Production Plant .................................................................................... 3-2 3.1.2 Transmission and Distribution Plant ..................................................... 3-3 3.1.3 General Plant ......................................................................................... 3-3 3.2 Electric System Assessment ................................................................................ 3-3 3.2.1 Electric Generating Stations ................................................................. 3-4 3.3 Transmission and Distribution Systems............................................................. 3-13 3.3.1 Safety .................................................................................................. 3-13 3.3.2 System Reliability ............................................................................... 3-13 3.3.3 Power Quality ..................................................................................... 3-14 3.3.4 Operations and Maintenance............................................................... 3-14 3.3.5 Design Standards and Specifications .................................................. 3-15 3.3.6 Transmission and Distribution Capital Improvements ....................... 3-15 3.3.7 Condition Assessment ......................................................................... 3-17 3.4 Conclusions ........................................................................................................ 3-18 4.0 FINANCIAL ASSESSMENT.............................................................................. 4-1 4.1 Financial Results .................................................................................................. 4-1 4.1.1 Required Revenue Level ....................................................................... 4-1 4.1.2 Electric Rates ........................................................................................ 4-1 4.1.3 Operating Results .................................................................................. 4-2 4.1.4 Adequacy of Electric Rates ................................................................... 4-6 4.2 Status of Revenue Bonds ..................................................................................... 4-7 4.3 Insurance .............................................................................................................. 4-8 4.4 Operating and Reserve Accounts ....................................................................... 4-10 City of Dover, Delaware TOC-1 Burns & McDonnell

Paj 11

2014 Engineering Consultant’s Report Table of Contents 4.4.1 Electric Revenue Fund ........................................................................ 4-11 4.4.2 Electric Improvement and Extension Fund......................................... 4-12 5.0 CONCLUSIONS ................................................................................................ 5-1 City of Dover, Delaware TOC-2 Burns & McDonnell

Paj 12

2014 Engineering Consultant’s Report Table of Contents LIST OF TABLES Page No. Table 3-1: Year-End Plant in Service ...................................................................................... 3-1 Table 3-2: Fiscal Year 2014 Planned Capital Expenditures .................................................... 3-2 Table 3-3: FY 2013 Generating Plant Operating Statistics ..................................................... 3-6 Table 4-1: Annual Sales and Customer Accounts ................................................................... 4-3 Table 4-2: Annual Revenues and Sales Ratios ........................................................................ 4-4 Table 4-3: Revenue Margins and Unaccounted for Energy .................................................... 4-5 Table 4-4: Comparative Statement of Revenues, Expense, ..................................................... 4-6 Table 4-5: Debt Service Coverage ........................................................................................... 4-7 Table 4-6: Debt Service Schedule of Electric Revenue Bonds ............................................... 4-8 Table 4-7: Schedule of Insurance Coverage in Effect ............................................................. 4-9 Table 4-8: Reserve Account Activity and Balances .............................................................. 4-14 City of Dover, Delaware TOC-3 Burns & McDonnell

Paj 13

2014 Engineering Consultant’s Report Table of Contents LIST OF FIGURES Page No. Figure 2-1: Organization ........................................................................................................... 2-3 Figure 2-2: Administration ........................................................................................................ 2-3 Figure 2-3: System Operations.................................................................................................. 2-4 Figure 2-4: Electric Engineering ............................................................................................... 2-4 Figure 2-5: Electric Transmission and Distribution .................................................................. 2-5 City of Dover, Delaware TOC-4 Burns & McDonnell

Paj 14

2014 Engineering Consultant’s Report Statement of Limitations LIST OF ABBREVIATIONS Abbreviation Term/Phrase/Name Burns & McDonnell Burns & McDonnell Engineering Company, Inc. City City of Dover, Delaware DCS distributed control system EDQP Employee Development and Qualification Program EIA U.S. Energy Information Administration FY Fiscal Year GWh gigawatt-hour I&E Fund Electric Improvement & Extension Fund kV kilovolt kW kilowatt kWh kilowatt-hour LAN local area network McKee Run McKee Run Generating Station MW megawatt MWh megawatt-hour NAES North American Energy Services Corporation NERC North American Electric Reliability Corporation NRG NRG Energy Center Ohm standard unit of electrical resistance PJM Pennsylvania New Jersey Maryland Interconnection Report 2014 Engineering Consultant’s Report on the Operation and Maintenance of the Electric System Resolution Resolution Authorizing and Securing Electric Revenue Bonds, adopted December 23, 1985 City of Dover, Delaware i Burns & McDonnell

Paj 15

2014 Engineering Consultant’s Report Statement of Limitations VanSant VanSant Generating Station TEA The Energy Authority, Inc. City of Dover, Delaware ii Burns & McDonnell

Paj 16

2014 Engineering Consultant’s Report Statement of Limitations STATEMENT OF LIMITATIONS In preparation of the 2014 Engineering Consultant’s Report on the Operation and Maintenance of the Electric System (the Report), Burns & McDonnell relied upon information provided by the City of Dover, Delaware (the City). The information included various analyses, computer-generated information and reports, audited financial reports, and other financial and statistical information, as well as other documents such as operating budgets and current retail electric rate schedules. While Burns & McDonnell has no reason to believe that the information provided, and upon which Burns & McDonnell has relied, is inaccurate or incomplete in any material respect, Burns & McDonnell has not independently verified such information and cannot guarantee its accuracy or completeness. In addition, Burns & McDonnell has used the information provided to make certain assumptions with respect to conditions that may exist in the future. While Burns & McDonnell believes the assumptions made are reasonable for the purposes of the Report, it makes no representation that the conditions assumed will occur. City of Dover, Delaware iii Burns & McDonnell

Paj 17

1.0 – EXECUTIVE SUMMARY

Paj 18

2014 Engineering Consultant’s Report Executive Summary 1.0 EXECUTIVE SUMMARY 1.1 Introduction The 2014 Engineering Consultant’s Report on the Operation and Maintenance of the Electric System (Report) has been prepared in compliance with the requirements of the City of Dover, Delaware Resolution Authorizing and Securing Electric Revenue Bonds, adopted December 23, 1985 (Resolution). Burns & McDonnell was retained as the Engineering Consultant by the City of Dover, Delaware (City) to complete an inspection of the Electric System and prepare a report on findings. The Resolution requires that the Engineering Consultant complete the following: “The City covenants that it will cause the Engineering Consultants employed under the provisions of Section 705 of this Resolution . . . to make an inspection of the Electric System at least once each fiscal year and . . . to submit to the City Manager a report setting forth (a) their findings whether the properties of the Electric System have been maintained in good repair, working order and condition and whether they have been operated efficiently and economically and (b) their recommendation as to (i) the proper maintenance, repair and condition of the Electric System during the ensuing fiscal year and an estimate of the appropriations which should be made for such purposes, (ii) the insurance to be carried under the provisions of Article VII of this Resolution, (iii) the amount that should be deposited during the ensuing fiscal year to the credit of the Improvement and Extension Fund for the purposes set forth in Section 510 of this Article, (iv) the extensions, improvements, renewals and replacements which should be made during the ensuing fiscal year, and (v) any necessary or advisable revisions of the electric rates.” This is the eleventh annual Engineering Consultant’s Report prepared for the City by Burns & McDonnell. 1.2 Electric System Overview and Assessment The Electric Division served 23,446 customers at the end of fiscal year (FY) 2013, 19,993 of which were residential customers. Four of the Electric Division customers take service from the 69-kV transmission system. These customers include the Dover Air Force Base, Kraft, Proctor & Gamble, and NRG Energy City of Dover, Delaware 1-1 Burns & McDonnell

Paj 19

2014 Engineering Consultant’s Report Executive Summary Center (NRG). NRG is an exempt wholesale generator that sells power that must be transmitted through the City’s transmission system to third party purchasers. When the NRG plant is not operational, the Electric Division provides power for the plant site. 1.2.1 General Plant General plant facilities consist primarily of Electric Division administrative and operations facilities and pollution control related equipment on McKee Run Generating Station (McKee Run) and VanSant Generating Station (VanSant). Other types of general plant include office furniture and equipment, transportation and power-operated equipment, and communication equipment. Effective July 1, 2011, the City entered into an Energy Management Agreement with The Energy Authority, Inc. (TEA) to assist the City with its energy procurement, energy sale, purchase of fuels, establishment and management of risk policies, and the development and management of hedging protocols and related energy procurement challenges. Headquartered in Jacksonville, Florida, TEA is a non-profit energy manager owned by seven public utility systems operating across the nation. 1.2.2 Production Plant The City owns two generating plants, the McKee Run and VanSant generating stations. McKee Run consists of three steam turbine generating units with a total combined capacity of 136 megawatts (MW). VanSant is a 39 MW simple-cycle combustion turbine unit. North American Energy Services Corporation (NAES Corporation) operates the generating plants. The agreement between the City and NAES Corporation has been in effect since July 1, 2006. The various systems and components of the generating plants reviewed by the Engineering Consultant are listed below: Major Equipment  Steam turbines/generators  Boilers and auxiliaries  Station cooling water systems  Fuel handling systems  Water treatment systems  Station electrical systems  Station control systems  General facilities City of Dover, Delaware 1-2 Burns & McDonnell

Paj 20

2014 Engineering Consultant’s Report Executive Summary Management and Organization  Safety  Training  Staffing Based on statements and information provided by the City, as well as the observations and reviews performed, it is the Engineering Consultant’s opinion that the City’s power generation facilities are being operated and maintained consistent with generally accepted electric utility practice in the United States. In general, the performance, operation, maintenance, staff, planning, and training aspects for the McKee Run and VanSant were found to be above average. Specifically, the generation facilities have demonstrated a high level of availability despite the dispatching of the units primarily for peak demand. 1.2.3 Transmission and Distribution Plant The transmission and distribution network includes 44 miles of overhead transmission lines, 0.12 miles of underground transmission lines, 190 miles of overhead distribution lines and 268 miles of underground distribution lines. Four Electric Division customers take service off of the 69-kV transmission system. The following list includes areas of the transmission and distribution system that were considered and reviewed.  System reliability  Power quality  Operations and maintenance  Design standards and specifications  Transmission and distribution improvements It is the Engineering Consultant’s opinion that the design, construction, operation, and maintenance of the City’s electric transmission and distribution system and the associated facilities are consistent with current generally accepted electric utility standards. In recent years, the City has made appropriate upgrades and improvements which the Engineering Consultant has observed while conducting the reviews and assessments to complete the annual reports. 1.3 Financial Assessment The level of revenues required from the retail electric rates for the Electric Division were determined through the analysis of the financial results and net income or net margins for FY 2013. The Resolution requires that the Electric Division maintain a debt service coverage ratio of 1.25. City of Dover, Delaware 1-3 Burns & McDonnell

Paj 21

2014 Engineering Consultant’s Report Executive Summary Customers of the Electric Division of the City were charged for the electric service they received based on the City’s rate schedules and contracts that were in place in FY 2013. A comprehensive cost-of-service and rate design study was completed in 2006 and subsequent rate analyses were completed in 2007, 2008, 2012, and 2013 to examine revenue requirements and revenue generation. Specifically, the 2006 rate study was conducted to address increased costs associated with a new power supply contract that became effective on July 1, 2006. The rate study recommended combining a number of rate classes and implementing rate increases on July 1, 2006. The 2006 rate study also recommended an additional increase be implemented on January 1, 2007 to cover increased costs associated with operating the generating station. The 2007 and 2008 rate analyses re-examined Electric Division revenues and expenses and recognized additional revisions to power supply costs. As a result of these analyses, additional rate increases were implemented on July 1, 2007, July 1, 2008, and July 2012. The July 2013 rate adjustments established the rate schedules utilized by the Electric Division today. Total energy sales increased from 710.3 GWh in FY 2012 to 723.1 GWh in FY 2013, an increase of 1.8 percent. Total revenue from sales to electric customers in FY 2013 was $88.3 million, representing a decrease of $3.6 million from FY 2012 rate revenue of $91.9 million. In FY 2013, the average revenue per kWh for residential customers was 14.00 cents and the system-wide average price was 12.22 cents per kWh. The Electric Division’s largest cost in providing electric service to its customers is the wholesale cost of power purchased from the Pennsylvania New Jersey Maryland Interconnection (PJM) marketplace through its energy manager, TEA. From FY 2012 to FY 2013, the cost of power increased from $58.9 million to $65.4 million. Net income decreased from $8.5 million in FY 2012 to $6.2 million in FY 2013. The net income decrease in FY 2013 was due in large part to the increase in transfers out of the Electric Revenue Fund. Following is an excerpt from Section 502(c) of the Resolution. “(c) The total amount of the Revenues of the Electric System during the preceding fiscal year shall have been not less than the total of the following: The Current Expenses of the Electric System during the current fiscal years shown by the Annual Budget . . . for such fiscal year, and City of Dover, Delaware 1-4 Burns & McDonnell

Paj 22

2014 Engineering Consultant’s Report Executive Summary One hundred twenty-five percent (125%) of the maximum amount of the Principal and Interest Requirements for any fiscal year thereafter on account of all bonds then Outstanding under the provisions of this Resolution.” The Resolution requires that annual revenues of the Electric Division be no less than the total current expenses plus 125 percent of the greatest remaining annual debt service. The Electric Division achieved debt service coverage ratios for FY 2011, FY 2012, and FY 2013 of 5.45, 6.48, and 6.56 respectively; therefore, the revenues generated by the current electric rates have been sufficient to meet the applicable covenant of the Resolution. The City maintains a comprehensive insurance program to cover varying types of liabilities, as well as significant losses related to various Electric Division properties. It is the opinion of Burns & McDonnell as Engineering Consultant, and not as insurance counselor, the insurance in full force and affect appears to satisfy the requirements of Section 706 of the Resolution. The City established the Electric Revenue Fund and the Electric Improvement & Extension (I&E) Fund to make moneys available for specific purposes when they are needed. The following is a list of these funds’ respective cash accounts: Electric Revenue Fund  Insurance Reserve Account  Contingency Reserve Account  Electric Rate Stabilization Reserve Account  Interest and Sinking Account Electric Improvement and Extension Fund  Depreciation Reserve Account  Future Capacity Reserve Account The Engineering Consultant reviewed activity information on the accounts listed above and found that the balances in those accounts as of June 30, 2013, were consistent with the required or target balances. 1.4 Conclusions Based on the reviews and assessments completed, it is the opinion of Burns & McDonnell that: City of Dover, Delaware 1-5 Burns & McDonnell

Paj 23

2014 Engineering Consultant’s Report Executive Summary 1. The City’s power generation facilities are being operated and maintained consistent with generally accepted electric utility practice in the United States. 2. The design, construction, operation, and maintenance of the City’s electric transmission and distribution system and the associated facilities are consistent with current generally accepted electric utility standards and over the past few years, the system has been upgraded in order to improve operation and service to customers. 3. The Electric Division capital projects included in the City’s Capital Investment Plan and the FY 2014 Operating Budget are necessary and should provide improved reliability and power quality for the Electric System. 4. The cash balances as of June 30, 2013 for the various accounts maintained by the City for the Electric Division appear to be sufficient for their defined purposes. 5. The insurance coverage in full force and effect as maintained by the City related to the various assets of the Electric Division appears to satisfy the requirements of Section 706 of the Resolution. 6. The electric revenues generated by the City’s current retail rates are more than sufficient to fulfill the debt service coverage requirement (125 percent of current expenses) defined in Section 502(c) of the Resolution. City of Dover, Delaware 1-6 Burns & McDonnell

Paj 24

2.0 – INTRODUCTION

Paj 25

2014 Engineering Consultant’s Report Introduction 2.0 INTRODUCTION The City of Dover, Delaware (City) operates a municipally-owned electric utility system that served 23,446 customers within the City and surrounding areas at the end of fiscal year (FY) 2013. The service area of the electric utility is located in central Delaware; with the City itself located approximately 70 miles south of Philadelphia, Pennsylvania. 2.1 Purpose of Report This 2014 Annual Engineering Consultant’s Report (Report) has been prepared in compliance with the requirements adopted December 23, 1985 of the City of Dover Electric Bond Resolution (Resolution). Burns & McDonnell was retained by the City as the Engineering Consultant defined in Section 705 of the Resolution, as follows. “The City covenants that it will, for the purpose of performing and carrying out the duties imposed on the Engineering Consultants under the provisions of this Resolution, employ an independent engineer or engineering firm or corporation having a nationwide and favorable repute for skill and experience in such work.” The required scope of the Report is described in Section 504 of the Resolution, as follows. “The City covenants that it will cause the Engineering Consultants employed under the provisions of Section 705 of this Resolution . . . to make an inspection of the Electric System at least once each fiscal year and . . . to submit to the City Manager a report setting forth (a) their findings whether the properties of the Electric System have been maintained in good repair, working order and condition and whether they have been operated efficiently and economically and (b) their recommendation as to (vi) the proper maintenance, repair and condition of the Electric System during the ensuing fiscal year and a estimate of the appropriations which should be made for such purposes, (vii) the insurance to be carried under the provisions of Article VII of this Resolution, (viii) the amount that should be deposited during the ensuing fiscal year to the credit of the Improvement and Extension Fund for the purposes set forth in Section 510 of this Article, (ix) the extensions, improvements, renewals and replacements which should be made during the ensuing fiscal year, and City of Dover, Delaware 2-1 Burns & McDonnell

Paj 26

2014 Engineering Consultant’s Report Introduction (x) any necessary or advisable revisions of the electric rates.” 2.2 Organization The Electric Utility Director is responsible for the overall management of the Electric Utility Division. (The Electric Utility Director position is currently vacant.) The Electric Director oversees the day-to-day operations of the Electric Division and manages the Division’s staff. The Director also provides oversight of the Power Plant budget, monitors the contracts of the energy coordinator and the power generation operator/manager, and is responsible for North American Energy Services Corporation (NAES Corporation) contracts and oversight. The Electric Division is organized into four separate operating sections. Descriptions of the current Electric Division sections are provided below. Administration Section – Administration provides the overall management of the Electric Division’s Engineering and Transmission & Distribution Sections. This section performs all planning and budgeting, monitors all construction projects, administers all power supply and generating station operations agreements, and coordinates with customer service and public relations for the Electric Division. System Operations Section – System Operations is responsible for the operation of a 24/7 system operations control center. This section was formally a part of the Electric Engineering Section, but now has been identified as its own section comprising of the System Operators Crew Leader and the Operators. Electric Engineering Section – Electric Engineering provides design, specifications, construction management, and project inspection for all capital investment projects of the Electric Division. This section also develops and maintains maps, plans, and specifications, as well as engineering standards for construction and maintenance of the Electric System. Transmission & Distribution Section – Transmission & Distribution constructs, operates, and maintains the overhead and underground electric systems and fiber optic communication facilities. This section installs and maintains all electric metering, as well as street and security lighting. This section also investigates and resolves customers’ power problems and oversees the work of tree trimming contractors. Figures 2-1 through 2-4 provide organizational charts illustrating the staffing hierarchies of the various sections in the Electric Division. The number of individuals in each position was indicated as appropriate. Electric Division staff totaled 38 at the time the FY 2014 budget was issued. City of Dover, Delaware 2-2 Burns & McDonnell

Paj 27

2014 Engineering Consultant’s Report Introduction The subsequent sections of the Report provide a discussion of the required reviews and inspections conducted pursuant to Section 504 of the Resolution. Section 3 describes the assessment of the Electric System and its condition. Section 4 presents the financial results for the Electric Division, including an analysis of the adequacy of revenues provided by the electric rates. Section 5 summarizes the conclusions of Burns & McDonnell regarding the operation and maintenance of the Dover Electric System. Figure 2-1: Organization Figure 2-2: Administration City of Dover, Delaware 2-3 Burns & McDonnell

Paj 28

2014 Engineering Consultant’s Report Introduction Figure 2-3: System Operations System Operations System Ops Crew Leader (1) System Operators (4) Figure 2-4: Electric Engineering City of Dover, Delaware 2-4 Burns & McDonnell

Paj 29

2014 Engineering Consultant’s Report Introduction Figure 2-5: Electric Transmission and Distribution City of Dover, Delaware 2-5 Burns & McDonnell

Paj 30

3.0 – ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT

Paj 31

2014 Engineering Consultant’s Report Electric System Overview and Assessment 3.0 ELECTRIC SYSTEM OVERVIEW AND ASSESSMENT 3.1 Electric System Overview The Electric System owned by the City primarily consists of production plant, transmission plant, distribution plant, and general plant facilities, and construction work in progress. Table 3-1 displays the year-end balances of the various plant components for FY 2011 through FY 2013. Table 3-2 itemizes the specific capital investment plan projects and anticipated expenditures included in the FY 2014 budget. Table 3-1: Year-End Plant in Service FY 2011 FY 2012 FY 2013 Capital assets, not being depreciated Land $ 1,458,066 $ 1,458,066 $ 1,458,066 Construction in progress 424,809 789,014 1,338,909 Total capital assets, non-depreciable $ 1,882,875 $ 2,247,080 $ 2,796,975 Capital assets, being depreciated Buildings $ 17,383,566 $ 17,456,628 $ 17,619,349 Production 63,408,937 64,610,399 65,040,049 Transmission 32,558,944 33,106,748 34,010,686 Distribution 59,824,248 60,680,365 61,752,469 Administration 1,551,280 1,634,017 1,743,754 Vehicles 622,236 640,096 625,876 Total capital assets, being depreciated $ 175,349,211 $ 178,128,253 $ 180,792,183 Less accumulated depreciation for: Buildings $ (10,992,065) $ (11,400,308) $ (11,795,879) Production (39,931,442) (41,416,622) (42,682,428) Transmission (9,206,982) (10,344,554) (11,537,017) Distribution (23,817,302) (25,322,267) (26,832,246) Administration (1,102,778) (1,196,545) (1,316,532) Vehicles (435,188) (464,219) (481,527) Total accumulated depreciation $ (85,485,757) $ (90,144,515) $ (94,645,629) Total capital assets, being depreciated, net 89,863,454 87,983,738 86,146,554 Total capital assets, net $ 91,746,329 $ 90,230,818 $ 88,943,529 In FY 2013, the Electric System experienced a decrease in the annual system peak demand and an increase in annual energy sales from the previous year. The Electric System experienced its peak at 2 p.m. on July 8, 2012 of 171.6 MW. For the year, 723.1 GWh of energy were sold, an increase of 1.8 percent from the preceding year. The Electric Division projects energy sales in FY 2014 to total 721.2 GWh, a decrease of 0.3 percent. The Electric Division expects annual energy sales to remain relatively constant from FY 2014 through FY 2018. City of Dover, Delaware 3-1 Burns & McDonnell

Paj 32

2014 Engineering Consultant’s Report Electric System Overview and Assessment Table 3-2: Fiscal Year 2014 Planned Capital Expenditures Electric Engineering Projects: General Scott Switchgear $ 800,000 Air Conditioner Replacement/Monitors 12,000 Substation Battery Replacement 24,500 Distribution Upgrades 400,000 Lighting Project and Rehabilitation 50,000 Distribution Feeder Replacement Program 277,500 Distribution Capacitors and Controls 60,000 Transmission Line Maintenance Program 75,000 69 kV Substation Switch Replacement 80,000 Horsepond Substation Reliability Upgrade 591,800 Subtotal Electric Engineering Division $ 2,370,800 Electric Transmission & Distribution Projects: New Developments $ 600,000 Advanced Metering Infrastructure 150,000 Subtotal Electric Transmission Division $ 750,000 Electric Generation Projects: Unit 3 Cooling Tower Repairs $ 42,000 McKee Run Unit 3 Auxiliary System Components 116,000 VanSant Unit 11 Component Replacements 32,000 McKee Run High Energy Piping Repairs 80,000 Metering Systems Upgrades 25,000 McKee Run & VanSant Safety & Compliance Improvemetns 86,000 McKee Run Natural Gas System Block/Bleed Valves 65,000 McKee Run & VanSant Mobile Crane Repair/Replace 125,000 McKee Run & VanSant Preservation of Structures 42,000 McKee Run Unit 3 Turbine Repairs 1,149,800 McKee Run Units 1 & 2 Component Repairs 105,000 Van Sant Capacity Increase 250,000 Subtotal Electric Generation Division $ 2,117,800 Total Planned Capital Investment Projects $ 5,238,600 3.1.1 Production Plant The City owns two plants, the McKee Run and VanSant generating stations. McKee Run consists of three steam turbine generating units with a total combined capacity of 136 megawatts (MW). VanSant is a 39- MW simple-cycle combustion turbine unit. North American Energy Services Corporation (NAES Corporation) operates the generating plants. The agreement between the City and NAES Corporation has been in effect since July 1, 2006. The Engineering Consultant’s observations regarding the generating stations and units are described later in this section of the Report. City of Dover, Delaware 3-2 Burns & McDonnell

Paj 33

2014 Engineering Consultant’s Report Electric System Overview and Assessment Effective July 1, 2011, the City entered into an Energy Management Agreement with The Energy Authority, Inc. (TEA) to assist the City with its energy procurement, energy sales, purchase of fuels, establishment and management of risk policies, the development and management of hedging protocols and related energy procurement challenges. 3.1.2 Transmission and Distribution Plant The service area includes 44 miles of overhead transmission lines, 0.12 miles of underground transmission lines, 190 miles of overhead distribution lines and 268 miles of underground distribution lines. Four Electric Division customers take service off of the 69-kV transmission system. These customers include the Dover Air Force Base, Kraft, Proctor & Gamble, and NRG Energy Center (NRG). NRG is an exempt wholesale generator that sells power that must be transmitted through the City’s transmission system to third party purchasers. When the NRG plant is not operating the Electric Division provides power for the plant site. The Electric Division has two contracts for providing transmission service through the Electric System. The Electric Division provides transmission service to NRG for the output of its 16 MW electric generator. The Electric Division also has a point-to-point contract for the output of an NRG Combustion Turbine which ties directly to the Kent Substation and is not part of the Dover transmission system. 3.1.3 General Plant The general plant category consists primarily of Electric Division administrative and operations facilities, and pollution control-related equipment at McKee Run and VanSant. The agreement with NAES Corporation stipulates NAES Corporation manage the operation and maintenance of the facilities while the City funds all replacements and upgrades required to maintain the capability of the two generating stations. The City is also responsible for the costs of compliance with new regulations promulgated. Other types of items included in the general plant category include office furniture and equipment, computer- related equipment, transportation and power-operated equipment, and communication equipment. Burns & McDonnell did not specifically assess the items in the general plant category for the Report. 3.2 Electric System Assessment Burns & McDonnell made observations and conducted assessments of the Electric System assets in support of the development of this annual Engineering Consultant’s Report. The findings of Burns & McDonnell from the review of the City’s Electric System are documented herein. City of Dover, Delaware 3-3 Burns & McDonnell

Paj 34

2014 Engineering Consultant’s Report Electric System Overview and Assessment 3.2.1 Electric Generating Stations On April 17, 2014, Mr. Ted Kelly of Burns & McDonnell met with representatives of NAES Corporation to discuss the condition of the McKee Run and VanSant generating stations. Mr. Kenneth Beard, the Plant O&M Manager, coordinated the visit along with Mr. Vince Scire, the Plant Manager. 3.2.1.1 Description McKee Run consists of three units. Units 1 and 2 were originally coal-fired units, which began operations in 1961 and 1962, respectively. In 1972, these units were converted to burn No. 6 fuel oil. Units 1 and 2 each have rated capacities of 17 MW. Unit 3 began operations in 1975 and was designed to fire No. 6 fuel oil and natural gas. Unit 3 has a rated capacity of 102 MW. In FY 2008, the City began work to convert all three units at McKee Run to burn No. 2 fuel oil in order to reduce pollution from the plant. To date, the necessary upgrades and new equipment had been installed allowing each of the units to burn both natural gas and No. 2 fuel oil. VanSant consists of a simple cycle combustion turbine with a rated capacity of 39 MW. This unit commenced operation in 1991. VanSant remains unmanned, except when it is dispatched into service. On the occasions when the unit is dispatched, personnel from McKee Run are transferred to VanSant to startup and operate the unit. 3.2.1.2 Management and Organization Station management is very well organized and knowledgeable. Personnel take a logical approach to the operation and maintenance of the generation facilities. Mr. Vince Scire serves as the Plant Manager. The management/leadership team consists of eight positions including Mr. Scire’s position. The Administrative Manager, O&M Manager, Compliance Coordinator, and Materials Coordinator, all report directly to Mr. Scire. One Operations Supervisor and two Day Shift Operator positions are currently open at the plant. The open Operations Supervisor position is part of the management/leadership team. The O&M Manager oversees a Maintenance Supervisor and four Operations teams. Each operations team consists of two supervisors and three operators working 12-hour rotating shifts. Two operators work eight-hour flex time shifts Monday through Friday, and fill in as needed. The maintenance team consists of a planner, a supervisor and five employees working eight-hour shifts. The operations and maintenance personnel are all union employees. The relationship between the union and management was reported to be excellent. McKee Run is currently at a staff level of 29 employees, with 32 approved positions. City of Dover, Delaware 3-4 Burns & McDonnell

Paj 35

2014 Engineering Consultant’s Report Electric System Overview and Assessment 3.2.1.3 Safety “Safety First” is an overall theme and attitude of the Electric Division. Near-miss incidents are documented, reviewed, and corrective follow-up actions are taken as required with an employee-run safety committee actively in place. This committee conducts monthly safety meetings, completes safety equipment inspections, and defines and implements tasks to improve safety in all areas. Members of the safety committee complete periodic visual inspections of employee work activities utilizing an observation checklist to detail their findings. Recorded observations are discussed and infractions corrected. Safety is the first topic discussed at all meetings at the generating plant. An indoctrination video emphasizing safety is shown to all visitors when entering the Station. There were no restricted work days or lost time accidents reported in FY 2013. NAES ended the year with 51,786 man-hours worked with no OSHA recordable accidents. 3.2.1.4 Training The required annual OSHA compliance training is completed and documented for each employee. A formal two-day employee orientation program is required for all new employees. This orientation covers a multitude of subjects from employee benefits to a review of the various Station operating manuals. For operator training, the Employee Development and Qualification Program (EDQP) has been established. EDQP is a formal program for training operators to progressively advance to positions with additional responsibilities. In addition to the above programs, cross training of various disciplines also occurs. An example of cross training would be plant operators training with maintenance staff. Plant staff receive environmental and safety training online via the GPi Learning website. The training includes tutorials and exams to ensure comprehension of the subject matter. Plant manuals, meetings, etc. offer additional safety training. Plant staff continues to receive appropriate operator certification training for the Pennsylvania New Jersey Maryland Interconnection (PJM) market. This training should continue in the future. The plant also completes planning and scheduling training on a regular basis for plant operators. 3.2.1.5 Major Equipment Operation and Maintenance In general, the generation facilities appear to have been properly operated and maintained, and in good condition as evidenced by the high availability of the units. The generation facilities are dispatched sparingly and operate primarily as peaking units. As such, the individual units incur a relatively large City of Dover, Delaware 3-5 Burns & McDonnell

Paj 36

2014 Engineering Consultant’s Report Electric System Overview and Assessment number of starts per year and low annual capacity factor. Table 3-3 summarizes the major FY 2013 operating statistics. The large amount of time that units are not operating allows for maintenance and repair of the units. As a result, the FY 2013 overall equivalent availability factor for the generation facilities averaged 58.99 percent. Low net capacity factors are partially offset by PJM capacity credits. In FY 2013, $14.3 million of PJM capacity credits helped cover the fixed operating and maintenance costs of the Electric System. PJM capacity credits are expected to continue to provide similar benefits in FY 2014 and beyond. 3.2.1.6 Electronic Management System Maintenance activities are organized, planned, and managed using MP2tm by CMMS Data Group, a computer-based management system. All three major categories of maintenance activities (corrective, preventative, and predictive) are electronically managed by MP2tm. Table 3-3: FY 2013 Generating Plant Operating Statistics Rated Net Net Heat Capacity - Production - Net Capacity Rate Number of Unit Number MW MWh Factor Btu/kWh Starts VanSant 39 1,568.4 0.46% 12,096 8 McKee Run Unit 1 17 545.5 0.37% 15,866 2 Unit 2 17 1,024.4 0.69% 14,812 4 Unit 3 102 12,692.5 1.42% 11,715 18 Total 175 15,830.7 1.03% 32 Forced Equivalent Outage Operating Service Availability Unit Number Hours Hours Factor Factor VanSant - 52.1 0.59% 59.45% McKee Run Unit 1 80.0 74.8 0.85% 57.62% Unit 2 - 170.3 1.94% 59.45% Unit 3 - 201.8 2.30% 59.45% Total 80.0 499.0 5.70% For corrective maintenance activities, any station operator or mechanic can enter a work order into the system at any terminal on the Station local area network (LAN). A supervisor reviews the request, turns it into a work order, and assigns a priority according to a predetermined categorization. The work order is planned, parts are ordered, and then the work order is assigned to an operator or maintenance technician for completion once the material has been received. City of Dover, Delaware 3-6 Burns & McDonnell

Paj 37

2014 Engineering Consultant’s Report Electric System Overview and Assessment This system is also used to manage and track preventative maintenance activities that follow a schedule. Changing filters, and turning on and off heat tracing are examples of preventative maintenance. Predictive maintenance activities practiced include oil analyses, vibration testing, and infrared surveys. Portable vibration testing equipment is used at the Stations to improve the frequency of and capabilities to trouble- shoot rotating equipment. The technology allows personnel to identify problems and take corrective actions before equipment failure occurs. 3.2.1.7 Electric Generation Improvements The following describes completed, on-going, and planned improvements to the City’s generation assets: Recently Completed:  DOE Grant - Photovoltaic Panels  McKee Run & VanSant Arc Flash  McKee Run Driveway Repaving  Unit 3 Fire Protection System  Unit 3 Cooling Tower Life Extension  Unit 1 Outage FY 2011  Unit 2 - Boiler Inspection & Repair  VanSant CT Mark IV Upgrades  Work Management Software Replacement  Unit 3 - Gas Modification  Unit 3 Air Heater Expansion Joint  Units 1 and 2 Control Modifications  Units 1 and 2 Stack Repairs Inspection  Unit 3 - Stack Repairs Inspection  Unit 3 Boiler Air Heater  Unit 3 FD and ID Fan Controller Upgrade  Unit 3 DCS Computers & Software Upgrades  Units 1 and 2 Component Repairs  VanSant Component Replacements  Unit 3 Auxiliary System Components  Industrial Wastewater Discharge System  Unit 3 Air Heater Expansion Joint  Unit 3 Generator Repairs City of Dover, Delaware 3-7 Burns & McDonnell

Paj 38

2014 Engineering Consultant’s Report Electric System Overview and Assessment  Units 1 & 2 Stack Repairs  Unit 1 Gasket Leak Repair On-Going:  McKee Run Preservation of Structures  Unit 3 Boiler Systems  Unit 3 Auxiliary System Components  Unit 3 Turbine Outage – Inspections & Repairs  Units 1 & 2 Component Repairs Planned:  McKee Run Building Equipment Replacements  McKee Run High Energy Piping  McKee Run Natural Gas System Block/Bleed Valves  McKee Run Fuel Oil System Refurbishment  Unit 3 – Stack Repairs  Unit 3 – Cooling Water Line Replacement  Unit 3 – Cooling Tower Life Extension  Units 1, 2 & 3 Hydrogen Purity Analyzers  VanSant Capacity Increase  VanSant Major Overhaul & Inspection  VanSant Component Replacements  Metering System Upgrades  Safety & Compliance Improvements  Vehicles, Trucks & Equipment 3.2.1.8 Condition Assessment The following is a summary of the condition assessment of major equipment at McKee Run and VanSant as presented by the NAES corporation staff. Burns & McDonnell made no internal assessments of equipment during the facility tour. City of Dover, Delaware 3-8 Burns & McDonnell

Paj 39

2014 Engineering Consultant’s Report Electric System Overview and Assessment 3.2.1.9 Steam Turbines/Generators The steam turbines and generators for VanSant and McKee Run Units 1 and 2 were reported to be in satisfactory condition with no major problems. McKee Run Unit 3 turning gear engagement problems were reported in the summer 2010 outage report and repairs were completed in FY 2012. XL Insurance completes inspections of the Electric Division production facilities on an annual basis. After each inspection the insurance provider issues a report detailing its risk reduction recommendations. A recommendation following the FY 2011 inspection addressed safety. XL Insurance recommended the installation of a permanent fire protection system for the turbine generator bearings at McKee Run. The City completed the installation of the system in FY 2011 for Unit 3. The City and XL Insurance agree that portable foam generating carts are sufficient fire protection for Units 1 and 2, due to their light use. For FY 2012, Unit 1 conducted turbine generator checks and found a bearing steam seal leak. Steam seals were removed and sent out for refurbishment by Siemens Energy Services during the fall 2012 outage. Bearing was inspected and checked for wear. Bearing did have some wear and did not meet acceptable tolerance, so it was sent out for refurbishment by Fusion Babbiting. Turbine condition assessment was conducted during the fall outage and the Units were found to be in satisfactory working condition. For Spring 2013, an extensive inspection and testing was performed on Unit 3’s turbine and generator. The inspection showed signs of seam oil, hydrogen, and busing box leakages. All issues were fixed and brought to acceptable operating standards. NAES Instrument, Control and Electrical (IC&E) Technicians completed four recommended General Electric Technical Information Letters (TIL) projects for VanSant Unit 11 in both spring and fall 2013 outages as shown below: 1. Annual TIL 1004-2R1 (IGV’s and first stage corrosion/pitting inspection) 2. Annual TIL 1068-2R1 (IGV’s bushing inspection) 3. Annual TIL 1132-2 (IGV thrust washer corrosion inspection) 4. Annual TIL 1049-2R1 (Inspect and measure dovetail material loss) During the fall 2013 outage, NAES mechanics installed new hand wheel throttle valve mechanical parts. Thereafter, the IC&E installed a portable vacuum pump to the Unit 1 turbine to simulate vacuum. The turbine was reset and the throttle valve was closed. The throttle valve was then fully opened with no issues and the handle was freewheeling. City of Dover, Delaware 3-9 Burns & McDonnell

Paj 40

2014 Engineering Consultant’s Report Electric System Overview and Assessment 3.2.1.10 Boilers and Auxiliaries Boiler inspections are conducted every year on each of the boilers. The annual inspections typically include the inspection and cleaning of the major boiler components, including the mud and steam drums, the forced draft and induced draft fans, the windbox, condenser water box, condenser tubes, hotwell, air preheater components, and safety valves. In FY 2011, the outlet duct expansion joint was replaced on Unit 3. Operations removed the appropriate insulation and lagging to prepare the duct. The Electric Division contracted Apex to complete the installation the equipment. A complete seam weld was utilized to seal the joint and the job site was cleaned. No additional problems with this joint developed in FY 2012. In FY 2012, several principle changes were made on the generating system’s boiler and auxiliary units at McKee Run. New beck drives were installed on Unit 3 induced draft and forced draft fans. Also, sector plates and seals were replaced in the Unit 3 air heater. Following its FY 2010 annual inspection of the production facilities, XL Insurance recommended the City implement a program that tracks annual hot and cold settings of hangers in the steam, reheat, feedwater and boiler systems. In FY 2011 and FY 2012, the City met the recommendation by implementing a program that will examine the high energy piping systems on a five-year basis, beginning in 2014. During FY 2013 inspections, no major issues were found within the Unit 1 or Unit 2 boiler. Unit 3 had an issue during the startup of the boiler while attempting to obtain a boiler purge. The issue was fixed by replacing a Gas Fuel Trip Relay. Waterwall tubing sections were replaced within Unit 3’s A-2 burner. 3.2.1.11 Station Cooling Water Systems The Station has split cooling water systems with one system serving Unit 1 and Unit 2 and a separate system serving Unit 3. Projectile tube cleaning was completed on the Unit 1 and Unit 2 condensers during the spring FY 2011 outage. All the tubes in each unit were cleaned utilizing the scraper blade plug method. Samples were taken from the tube cleanings and retained for inspection. No leaks were detected in the expansion joint or condenser tubes. Each condenser box was cleaned. Projectile tube cleaning was last completed in the 1980’s. The cooling water systems are reported to be sufficiently sized and in satisfactory condition, with no major issues reported at the time of this Report. 3.2.1.12 Fuel Handling Systems Natural gas is delivered to the Station via a 4-inch pipeline for Unit 1 and Unit 2 and in a 10-inch diameter pipeline for Unit 3. No. 2 fuel oil is delivered to the Station by truck and unloaded into tanks. City of Dover, Delaware 3-10 Burns & McDonnell

Paj 41

2014 Engineering Consultant’s Report Electric System Overview and Assessment Forwarding pumps deliver the fuel oil to each of the units. No major fuel projects were reported to be completed in FY 2012. 3.2.1.13 Water Treatment/Steam Purity Quality control parameters for boiler feed-water, internal boiler water, cooling tower water, and steam purity are checked at a minimum of twice per day when systems are operating. Results are recorded and graphically compared to control limits. Adjustments are then made as required. Boiler feed water is treated city water (well water from the City) using a regenerative ion resin demineralizer system, along with deaeration for oxygen control. Boilers 1 and 2 use a coordinated phosphate control for boiler internal purity control and Boiler 3 uses a balanced trisodium phosphate and disodium phosphate within a narrow pH range. A deep-bored water well was installed to provide water in addition to the City supplied water. City water has a high chlorine level which may exceed the Station permitted limits. By combining City water with the well water, the chlorine levels can be maintained at the permitted limits. Water for cooling tower makeup is also obtained from City water. The primary control parameter is silica concentration. Blow down is adjusted as required to maintain control. The City is currently undergoing the approval process with Kent County to obtain an integrated waste water permit to be able to discharge cooling water to the sewer system. No major water treatment issues were reported at the time of this Report. Steam purity is not continuously monitored. Samples are taken twice daily and tested for pH, conductivity, and silica. There have not been any problems with steam purity. Annual inspections of the boiler drums and separation internals have verified that these systems are intact and operating properly. Following its FY 2010 annual inspection of the production facilities, XL Insurance recommended the City implement lay-up procedures to protect water systems from corrosion. In FY 2011 and FY 2012, NAES worked to update plant procedures to conform to best practices/OSHA standards. In FY 2012, the station did not experience any internal corrosion related failures, steam path deposits, or excessive condenser fouling. NALCO provides water treatment consulting services and chemicals. A representative visits the Station periodically to review test data and check chemical usage rates. No major issues were reported at the time of this Report. 3.2.1.14 Station Electrical Systems Overall, Station electrical systems and transformers are considered to be in satisfactory condition. A condition assessment of the generation facilities’ transformers was conducted in February 2011. Oil inspections and analyses were conducted. The inspector recommended that normal operation continue for City of Dover, Delaware 3-11 Burns & McDonnell

Paj 42

2014 Engineering Consultant’s Report Electric System Overview and Assessment all the transformers at the plant. Oil sampling is now completed twice per year on the generator step-up transformers (GSUs). All plant transformers are examined annually. Following its FY 2008 annual inspection of the production facilities, XL Insurance recommended the City build blast walls around transformers at the plant. In FY 2011, the City continued to research blast wall protection. Fire barrier walls were installed between the Unit 1 and 2 auxiliary transformers and the Unit 3 start-up transformer. Based on the 2012 XL Insurance annual inspection, there is still no sprinkler protection for GSU’s 1-3. 3.2.1.15 Station Control Systems Unit 1 and Unit 2 controls are electro-pneumatic and Unit 3 controls are a distributed control system (DCS). During the March FY 2011 spring outage, a controls upgrade was completed at McKee Run Units 1 and 2. The new devices control igniters, pilots and shut down main fuel to protect the boiler. The project included the installation of new limit switches on main gas, pilot gas, and oil supply/return valves. The controls upgrades help the system meet national fire protection codes. Following its 2007 annual inspection of the production facilities, XL Insurance recommended the City seal openings in fire barriers through which cables pass. The City has worked each year since to make progress on sealing openings in fire barriers. The City completed sealing the rest of the openings as part of its boiler controls and control room upgrades in 2013. In general, the station control systems are considered to be in satisfactory condition. The Unit 1 and Unit 2 control systems are outdated but perform satisfactorily. All relays have recently been inspected at both McKee Run and VanSant for North American Electric Reliability Corporation, PJM Interconnection and Mid-Atlantic Area Council compliance. The electro hydraulic control system was modified to become a primary/primary system in 2013. In 2013 additional control wiring was installed to upgrade the Unit 1 and Unit 2 gas control system. No major controls issues were reported at the time of this Report. 3.2.1.16 General Facilities No major projects or improvements were completed to the General Facilities in FY 2013 other than routine maintenance and repairs. In general, the station facilities appeared clean and well maintained during the site visit. 3.2.1.17 VanSant Generating Station In general, the unit is operated infrequently, but is well maintained. Although the station is only manned when operating, an operator performs a twice daily walk through with a checklist of items to review and City of Dover, Delaware 3-12 Burns & McDonnell

Paj 43

2014 Engineering Consultant’s Report Electric System Overview and Assessment the results are logged. The annual overhaul and inspections were conducted at VanSant during FY 2013. No major problems were found. The VanSant unit has the capability of black starts. The unit has the capability of remote control; however, the unit is not permitted for remote control. XL Insurance completes inspections of the Electric Division production facilities on an annual basis. After each inspection the insurance provider issues a report detailing its risk reduction recommendations. The lone recommendation for VanSant following the FY 2012 inspection addressed safety. XL Insurance recommended the installation of gas detection equipment at the plant. A gas detection system has been installed. The gas detectors will activate the fire suppression system and alarm to the central control system. No other major repairs or upgrades were made at VanSant in FY 2013. 3.3 Transmission and Distribution Systems On April 17, 2014, Mr. Ted Kelly visited the City to collect information and to observe the City transmission and distribution system, as operated and maintained by the Electric Division. Mr. Bill Hewlett provided information related to the transmission and distribution system. Mr. Hewlett also led a tour of the electric transmission and distribution system. The Electric Division distributes power to its customers by a network of transmission lines, distribution substations, and distribution lines. The transmission lines are rated at 69 kV and are connected to fifteen distribution substations located throughout the service area. The distribution substations reduce the power from transmission voltages to the primary distribution voltages of 12 kV to facilitate distribution of electric power to customers. 3.3.1 Safety Mr. Hewlett reported to Burns & McDonnell that there were no reportable injuries or lost workdays in FY 2013. 3.3.2 System Reliability The Electric Division provides for reliability of its distribution system by configuring a majority of its distribution circuits in primary open loop arrangements, improving existing circuits, and installing adequate substation transformer capacity. Normal transformer and line loading are limited to provide sufficient margin to convey firm power requirements during an emergency or a switching operation, or for maintenance. City of Dover, Delaware 3-13 Burns & McDonnell

Paj 44

2014 Engineering Consultant’s Report Electric System Overview and Assessment 3.3.3 Power Quality The Electric Division does not have any significant power quality problems. The overall power factor for the Electric System decreased from 99.86 percent in FY 2012 to 98.43 percent in FY 2013. Power transformers are equipped with load tap changers that regulate bus voltages at the distribution substations. Distribution transformers are equipped with no-load taps to make voltage adjustments. There are capacitors and voltage regulators on the Electric System that control voltage and vars on the portion of the system furthest away from the current source and generation. The system operators monitor the power factor closely and turn on capacitors or adjust the generation to compensate for low power factors. 3.3.4 Operations and Maintenance The Electric Division has a SCADA system that is monitored continuously for any problems that may arise in the Electric System. The main control room has two system operator desks and a large screen where system operating information is displayed. System operators can monitor the Electric System operation, such as voltage levels, current flows, etc. and make necessary adjustments as problems arise. The systems operators have received some PJM training, but are not required to be certified as Delmarva Power is the controlling agency. Loading on substation transformers used for an emergency, a switching operation, or maintenance is limited to 120 percent of the rated capacity, followed by a twelve-hour cool-down period. The Electric Division has eight line crews to work on the system. Four crews are responsible for overhead lines, four crews are responsible for underground lines, and one crew is responsible for maintenance. The primary responsibilities of the eight line crews are installation of new service connections and construction of new lines. The trouble crew maintains the street lights, repairs underground services and is the first responder to outages. Tree trimming is contracted out and is no longer performed by the Electrical Division; however, performance of the contractor is monitored by the Line Crew Superintendent. The Substation/Relay Maintenance Division is responsible for operation and maintenance of the substations and associated equipment. Visual inspections of substations, associated equipment, trip counter checks and battery systems checks are performed regularly. The Substation/Relay Maintenance Division is also responsible for contractor oversight during annual transformer condition assessments. TJ/H2b Analytical Services completed the annual transformer condition assessments in February 2011. No abnormal gas was indicated and since the oil condition was within acceptable parameters, TJ/H2b recommended the continuation of normal operation. The City has a contract with an environmental City of Dover, Delaware 3-14 Burns & McDonnell

Paj 45

2014 Engineering Consultant’s Report Electric System Overview and Assessment consultant to check each substation for oil leaks and to provide instruction on cleaning up in the event of an oil spill. The City contracts with an outside firm to inspect and chemically treat each wood pole in the Electric System every ten years. This is accomplished by awarding a five-year contract to spread out the expenses. Pole treatments were completed in May of 2013. Dover treated and inspected over 760 poles during 2013, of which, only one pole was rejected providing a 99.9% pass rate. 3.3.5 Design Standards and Specifications The Electric Division designs the transmission and distribution circuits and some substation upgrades in conformance with national safety standards. Other substation and transmission design is contracted to Pike Electric, Inc. The underground distribution design utilizes road or alley front access construction. This design means the electrical equipment, such as transformers and underground cable, are installed beside the road instead of behind houses or buildings. The advantage of front access construction is the accessibility for maintenance and repairs to cable and electric equipment. The underground cables are installed in polymerized vinyl chloride pipe for added protection and for easy cable replacement. The Electric Division installs jacketed, concentric cable that is rated at 15 kV, with 133 percent ethylene propylene rubber insulation. The standard overhead distribution design utilizes a flat construction with a single cross-arm and insulators on 45-foot class 2 poles. Typically all electrical equipment locations have ground rods installed with measured readings of 25 ohms or less. The substation design is generally a low-profile rigid bus design. The circuit breakers are SF6 gas-filled and the relays are microprocessor based with SCADA control and monitoring. 3.3.6 Transmission and Distribution Capital Improvements The following describes completed, on-going, and planned improvements to the City’s transmission and distribution assets: Recently Completed:  69-kV Feeders 3 and 4  Replacement of 69-kV Breakers & Design  Governors Avenue Rebuild City of Dover, Delaware 3-15 Burns & McDonnell

Paj 46

2014 Engineering Consultant’s Report Electric System Overview and Assessment  Mid-City Substation Upgrades  Substation PT and CT Replacement  Transmission Relaying, Replacement and Calibrations  Outage Management System  Wyoming Avenue – Underground  Pleasanton Acres – Underground  Royal Grant – New Underground Service  Dover Downs Switchgear  Substation Equipment & Fencing  69kV Switch Replacement  Frazier Substation Reliability Upgrade On-Going:  Capitol Park – Underground  Morris Estates – Underground  Bayside Drive (Persimmon to White Oak Road)  Lighting Project and Rehabilitation  Horsepond Road Substation Reliability Upgrade  Transmission Line Maintenance Program  Distribution Capacitors – Overhead  Distribution Capacitors – Underground  New Developments – UG Transformers  New Developments – UG Conductors/Devices  Meter Replacements  Vehicles, Trucks, & Equipment Planned:  Substation Battery Replacement  Richardson Circle  Lebanon 400 Feeder  Townpoint Distribution Upgrades  Distribution System Upgrades – Unidentified  Horsepond Road URD – Distribution Feeders City of Dover, Delaware 3-16 Burns & McDonnell

Paj 47

2014 Engineering Consultant’s Report Electric System Overview and Assessment  McKee Run Yard Rebuild (Transmission)  Distribution Feeder Replacement Program  McKee Run & State College Road Feeder Replacements  GOTP Transmission Line Relocation  McKee Run Transformer/Substation Repairs  Horsepond SS to Cartanza 69kV Rebuild  69kV Substation Cable Replacement North Street  General Scott Switchgear  Dover Air Force Base Substation Rebuild  System Automation  DNREC R&R Metering  West Dover Connector  Meadows at Jefferson Terrace  Chestnut Grove Development  Garrison Oak Technical Park  Uzin Utz Manufacturing 3.3.7 Condition Assessment The transmission and distribution system assessment included drive-by observations of a sample of the transmission circuits, distribution circuits, and substations. Many of the fifteen substations were physically observed during the tour. The following substations were observed during the tour:  McKee Substation  College Park Substation  Dover Downs Substation  Frazier Substation  VanSant Substation  General Scott Substation  Division Street Substation  Mid-City Substation  Mayfair Substation  St. Joan’s Substation  Cartanza Substation City of Dover, Delaware 3-17 Burns & McDonnell

Paj 48

2014 Engineering Consultant’s Report Electric System Overview and Assessment  Horsepond Substation  Danner Farm Substation  Lebanon Substation In general, the substations were in acceptable operating conditions. Bill Hewlett provided a tour of the substations with Ted Kelly on April 17, 2014. The Frazier Substation was rebuilt last year; an additional 3 breaker system was added for a 69 kV bus. The General Scott Substation has relatively new breakers, and the controls are scheduled to be upgraded in FY 2014 or 2015. Horsepond Substation is currently being rebuilt. Work started in late February and scheduled to be back in service by June, 2014. Conductor line was replaced at the Savannah and White Oak Substation areas. The City’s in the process of replacing conductor throughout the entire 69 kV system. Moving forward, a greater portion of the system will be converted from overhead to underground distribution. 3.4 Conclusions Based on statements and information provided, as well as the observations and reviews performed, it is the opinion of Burns & McDonnell that the City’s power generation facilities are being operated and maintained consistent with accepted electric utility practice in the United States. In general, the performance, operation, maintenance, staff, planning, and training aspects for the McKee Run and VanSant stations were found to be above average. Specifically, the generation facilities have demonstrated a high level of availability despite the dispatching of the units primarily for peak demand. It is the opinion of Burns & McDonnell that the design, construction, operation and maintenance of the City’s electric transmission and distribution system and the associated facilities are consistent with current generally accepted electric utility standards. In completing Annual Engineering Consultant’s Reports over the past several years, Burns & McDonnell has observed that the City has made appropriate system upgrades and improvements. The City and the Electric Division are proactive in preventative maintenance and expansion of the Electric System before problems arise. City of Dover, Delaware 3-18 Burns & McDonnell

Paj 49

4.0 – FINANCIAL ASSESSMENT

Paj 50

2014 Engineering Consultant’s Report Financial Assessment 4.0 FINANCIAL ASSESSMENT A review of the financial results of the Electric System for the fiscal year ended June 30, 2013, is provided below. 4.1 Financial Results The total revenue of the Electric Division during FY 2013 included revenue from charges for electric service, as well as miscellaneous revenues from items such as rents, penalties, reconnection fees, and development fees. On Table 4-4, revenues were compared to the Electric Division’s costs of providing services to its customers to determine whether the financial requirements of the Electric Division were met. 4.1.1 Required Revenue Level The level of revenues required from the retail electric rates for the Electric Division was determined through the analysis of the financial results and net income or net margins for the most recent fiscal year. The City of Dover, Delaware Resolution Authorizing and Securing Electric Revenue Bonds, adopted December 23, 1985 requires that the Electric Division maintain a debt service coverage ratio of 1.25. The following is an excerpt from Section 502(c) of the resolution. “(c) The total amount of the Revenues of the Electric System during the preceding fiscal year shall have been not less than the total of the following: (3) The Current Expenses of the Electric System during the current fiscal years shown by the Annual Budget . . . for such fiscal year, and (4) One hundred twenty-five percent (125%) of the maximum amount of the Principal and Interest Requirements for any fiscal year thereafter on account of all bonds then Outstanding under the provisions of this Resolution. The City further covenants that, from time to time and as often as it shall appear necessary, it will adjust the electric rates as may be necessary or proper so that the revenues of the Electric System in each fiscal year will not be less than the total of the amounts set forth in subdivision (c) of this section.” 4.1.2 Electric Rates Customers of the Electric Division are charged for the electric service based on rate schedules, tariffs, or contracts that reflect the costs to the Electric Division of providing that service. For purposes of setting City of Dover, Delaware 4-1 Burns & McDonnell

Paj 51

2014 Engineering Consultant’s Report Financial Assessment electric rates, customers with similar load and service characteristics should be placed in the same rate classification. A comprehensive cost-of-service and rate design study was completed in 2006 and subsequent rate analyses were completed in 2007 and 2008 to examine revenue requirements and revenue generation. Specifically, the 2006 rate study was conducted to address increased costs associated with a new power supply contract that became effective on July 1, 2006. The rate study recommended combining a number of rate classes and implementing rate increases on July 1, 2006. The 2006 rate study also recommended an additional increase be implemented on January 1, 2007 to cover increased costs associated with operating the generating station. The 2007 and 2008 rate analyses re-examined Electric Division revenues and expenses and recognized additional revisions to power supply costs. As a result of these analyses, additional rate increases were implemented on July 1, 2007 and July 1, 2008. The City retained Burns & McDonnell to conduct cost-of-service and rate design study in 2012 followed by an update in 2013. The 2012 study examined revenue adequacy, revenue responsibility, and revenue recovery for the Electric Division. It scrutinized customer classes and proposed adjustments for demand rate components and corresponding changes to energy charges. In May 2013, the City retained Burns & McDonnell to incorporate updated power supply cost projections, and other updates, into the model it developed as part of the 2012 Study. The current rate classes are listed below.  Residential  Small Commercial (1 Phase, 3 Phase, 1 Phase Heating, Church, and Municipal)  Medium Commercial (1 Phase & 3 Phase)  Large Commercial (3 Phase with Reactive Metering)  Primary  Transmission  Outdoor Development Lighting  Private Outdoor Lighting 4.1.3 Operating Results Table 4-1 presents a summary of the annual energy sales, the average monthly number of customer accounts, and the annual average kilowatt-hour (kWh) energy per customer of the Electric Division for FY 2011 through FY 2013. Annual energy sales decreased in FY 2012 to 710.3 GWh, a decrease of 3.2 percent from 734.1 GWh in FY 2011. Energy sales increased to 723.1 GWh in FY 2013, a 1.8 percent increase from FY 2012. City of Dover, Delaware 4-2 Burns & McDonnell

Paj 52

2014 Engineering Consultant’s Report Financial Assessment Table 4-1: Annual Sales and Customer Accounts FY 2011 FY 2012 FY 2013 Energy Sales (kWh) Residential 208,092,047 196,388,942 204,759,680 Commercial 243,985,517 230,814,311 232,220,877 Primary 153,879,249 160,560,686 167,144,717 Transmission 128,146,159 122,563,783 119,003,804 Total Energy Sales 734,102,972 710,327,722 723,129,078 Average Number of Monthly Customers (bills) Residential 19,730 19,910 19,990 Commercial 3,140 3,355 3,412 Primary 42 39 37 Transmission 3 4 4 Total Customers Accounts 22,915 23,308 23,443 Energy Usage Per Customer (kWh/cust./yr.) Residential 10,547 9,864 10,243 Commercial 77,702 68,797 68,060 Primary 3,663,792 4,116,941 4,517,425 Transmission 42,715,386 30,640,946 29,750,951 Average Usage Per Customer 32,036 30,476 30,846 Table 4-2 presents revenues from sales, revenue per kWh ratios, and average revenue per customer ratios for each revenue classification. Total revenue from sales to electric customers in FY 2013 was $88.3 million, representing a decrease of $3.6 million, or 3.9 percent from FY 2012. Total revenue from sales to electric customers includes utility tax revenue and power cost adjustment revenue. In FY 2013, the average rate revenue per kWh for residential customers was 14.00 cents and the total average rate revenue was 12.22 cents per kWh. The July 2012, through June 2013 national average monthly utility-level retail sales of electricity and associated revenue per kWh, as published by the US Energy Information Administration (EIA), were 11.88 and 9.84 cents per kWh, respectively. For a state- wide comparison, the EIA summarized the Delaware July 2012 through June 2013 average monthly utility-level retail sales of electricity and associated revenue per kWh to be 13.58 cents per kWh for residential customers and 11.06 cents per kWh across all sectors.1 1 US Energy Information Administration, Form EIA-826 Data Monthly Electric Utility Sales and Revenue Data, http://www.eia.gov/electricity/data/state/avgprice_annual.xls (May 22, 2014) City of Dover, Delaware 4-3 Burns & McDonnell

Paj 53

2014 Engineering Consultant’s Report Financial Assessment Table 4-2: Annual Revenues and Sales Ratios FY 2011 FY 2012 FY 2013 Revenue Residential $ 30,774,462 $ 28,072,775 $ 28,668,248 Commercial 36,572,134 33,381,554 30,520,784 Primary 18,450,238 17,986,987 17,699,865 Transmission 13,716,322 12,506,664 11,442,299 Total Revenue $ 99,513,156 $ 91,947,980 $ 88,331,196 Revenue/kWh Residential $ 0.1479 $ 0.1429 $ 0.1400 Commercial 0.1499 0.1446 0.1314 Primary 0.1199 0.1120 0.1059 Transmission 0.1070 0.1020 0.0962 Total Revenue/kWh $ 0.1356 $ 0.1294 $ 0.1222 Revenue Per Customer Residential $ 1,560 $ 1,410 $ 1,434 Commercial 11,647 9,950 8,945 Primary 439,291 461,205 478,375 Transmission 4,572,107 3,126,666 2,860,575 Average Revenue Per Customer $ 4,343 $ 3,945 $ 3,768 The Electric Division’s largest cost in providing electric service to its customers in FY 2013 was the wholesale cost of power. The Electric Division purchased power from the PJM Interconnection marketplace through its Energy Manager, TEA. The cost of non-generated power includes energy and demand costs, power supply management expense, PJM charges and credits, generation fuels cost, and capacity charges and credits. The significance of power supply cost to the Electric Division is illustrated in Table 4-3. The top portion of the Table shows net operating revenue as the difference between total revenues generated by the rates and the cost of power supply.2 The ratios of power supply cost to sales revenues were calculated for FY 2011 through FY 2013. As illustrated, the Electric Division’s power supply cost as a percentage of rate revenue increased from 64.1 percent in FY 2012 to 63.0 percent in FY 2013. 2 For the purposes of this Report, the phrase “Power Supply” refers to the sum of the costs of power purchased and power generated. This includes plant costs and the cost of fuel. Power Supply also includes any expenses in the CIP Fund that are not capital expenses. The phrase “Purchased Power” refers only to the cost of power purchased from the market and other directly associated costs. City of Dover, Delaware 4-4 Burns & McDonnell

Paj 54

2014 Engineering Consultant’s Report Financial Assessment Table 4-3: Revenue Margins and Unaccounted for Energy FY 2011 FY 2012 FY 2013 Net Revenue Margins ($) Sales Revenues $ 99,513,156 $ 91,947,980 $ 88,331,196 Power Supply 69,616,076 58,929,133 55,681,251 Net Revenue Margin $ 29,897,080 $ 33,018,847 $ 32,649,945 Net Revenue Ratio 70.0% 64.1% 63.0% Unaccounted for Energy (kWh) Power Supply 768,254,000 738,190,000 752,869,000 Energy Sales 734,102,972 710,327,722 723,129,078 Unaccounted for Energy (Losses) [1] 34,151,028 27,862,278 29,739,922 Percentage 4.4% 3.8% 4.0% [1] Unaccounted for Energy (Losses) includes street lighting energy Table 4-3 also illustrates the ratio of the amount of energy purchased and delivered to the electric system to total energy sales. This relationship identifies the level of unaccounted for energy in the Electric System. This unaccounted for energy may include energy that was unmetered, metered inaccurately, stolen, lost, PJM transmission line losses, local system line/transformer losses, etc. The bottom portion of Table 4-3 presents these comparisons for the Electric Division for FY 2011 through FY 2013. As shown, the percentage ratio of the unaccounted for energy to the total energy purchased for FY 2013 was 4.0 percent. This is up from 3.8 percent in FY 2012. Table 4-4 presents a re-creation of the Electric Division’s Statement of Revenues, Expenses, and Changes in Unreserved Retained Earnings for the Electric Revenue Fund for FY 2011 through FY 2013. Net income decreased from FY 2012, totaling $6.2 million in FY 2013. An increase in Operating – Transfers Out resulted in a $2.3 million decrease in net income for the year. The General Fund Transfer was increased by $2.0 million to help finance the Calpine Project which the City is currently negotiating with for a Purchase Power Agreement and Capacity Agreement in light of the decommissioning Units 1 and 2. City of Dover, Delaware 4-5 Burns & McDonnell

Paj 55

2014 Engineering Consultant’s Report Financial Assessment Table 4-4: Comparative Statement of Revenues, Expense, and Changes in Unreserved Retained Earnings FY 2011 FY 2012 FY 2013 Operating Revenues: Charges for Electric Service $ 99,513,157 $ 91,947,980 $ 88,331,196 Miscellaneous Services/Incomes 2,389,462 1,581,421 2,354,497 Total Operating Revenues $ 101,902,619 $ 93,529,401 $ 90,685,693 Operating Expenses: General Administration $ 5,298,869 $ 5,223,149 $ 4,470,795 Power Supply 69,616,076 58,929,133 55,681,251 Transmission/Distribution 3,083,714 3,023,566 3,267,698 Engineering 1,722,244 1,163,379 1,107,231 Metering 204,352 205,791 219,010 System Operations 486,894 498,063 544,405 Utility Tax 1,944,543 1,548,208 1,443,853 Depreciation 4,710,658 4,783,444 4,621,501 Retirees Pension 1,115,765 Retiree Health Care 1,839,110 1,015,731 696,500 Total Operating Expenses $ 88,906,460 $ 76,390,464 $ 73,168,009 Net Operating Income $ 12,996,159 $ 17,138,937 $ 17,517,684 Non-operating Revenues (Expenses) Interest Earned Operating Fund $ 832,145 $ 120,876 $ 190,469 Reserved Funds 511,922 348,640 506,771 Net Increase in Fair Value of Investments (861,216) 45,200 (614,989) Interest and Fiscal Charges (1,385,035) (1,283,174) (1,432,779) Bond Discount Amortized (21,579) - Gain/(Loss) on Sale of Assets 16,830 47,966 5,203 Total Non-operating Revenues(Expenses) $ (906,933) $ (720,492) $ (1,345,325) Net Income Before Operating Transfers $ 12,089,226 $ 16,418,445 $ 16,172,359 Operating Transfers - In - - 8,282 Operating Transfers - Out (8,856,000) (7,876,288) (10,000,000) Total Net Operating Transfers $ (8,856,000) $ (7,876,288) $ (9,991,718) Net Income $ 3,233,226 $ 8,542,157 $ 6,180,641 4.1.4 Adequacy of Electric Rates The City’s Bond Resolution requires annual revenues of the Electric Division be no less than the total current expenses plus 125 percent of the greatest remaining annual debt service. “Current expenses”, as defined in the Resolution, includes all expenses necessary to maintain and repair the Electric System, all administrative expenses, and engineering, legal or other consultant fees. Transfers to reserve accounts and special purpose funds, and allowances for depreciation are specifically excluded from “current expenses.” City of Dover, Delaware 4-6 Burns & McDonnell

Paj 56

2014 Engineering Consultant’s Report Financial Assessment In order to determine if the City and the Electric Division have met this requirement, the net income shown in Table 4-4 was adjusted to include the interest on bonds, depreciation expense, and other non- cash income and expenses. Table 4-5 summarizes net income adjustments and the calculation of the revenues available for debt service for FY 2011 though FY 2013. Table 4-5: Debt Service Coverage FY 2011 FY 2012 FY 2013 Net Income $ 3,233,226 $ 8,542,157 $ 6,180,641 Plus Excluded Expenses: Operating Transfers - Out $ 8,856,000 $ 7,876,288 $ 10,000,000 Depreciation 4,710,658 4,783,444 4,621,501 Interest and Fiscal Charges 1,385,035 1,283,174 1,432,779 Bond Discount Amortized 21,579 - - Gain/(Loss) on Sale of Assets (16,830) (47,966) (5,203) Less Excluded Income: Net Increase in Fair Value of Investments 861,216 (45,200) 614,989 Interest Earned - Reserve Funds (511,922) (348,640) (506,771) Revenues Available for Debt Service $ 18,538,962 $ 22,043,257 $ 22,329,654 Maximum Principal and Interest in Any Year $ 3,401,954 $ 3,401,954 $ 3,401,954 Debt Service Coverage 5.45 6.48 6.56 Minimum Required Debt Service Ratio 1.25 1.25 1.25 As Table 4-5 illustrates, the City and the Electric Division maintained a debt service coverage ratio each year that exceeded the required 125 percent plus current expenses. Therefore, the revenues generated by the current electric rates have been sufficient to meet the applicable covenants of the Resolution. Section 502 of the Resolution requires that the annual debt service used in evaluating the revenues is to be the maximum amount for any fiscal year thereafter. Table 4-6 presents the annual totals of principal and interest amounts due on bonds currently outstanding. The calculation of the debt service coverage ratio in Table 4-5 is based on the total maximum debt service expense in any fiscal year. The FY 2013 calculation was based on the total FY 2016 debt service expense of $3,401,954. 4.2 Status of Revenue Bonds At the end of FY 2013, the City had two series of outstanding electric revenue bonds that were issued pursuant to the Resolution. On July 1, 2008, the City issued $22,200,000 in Electric Revenue Bonds (2008 Bonds). The proceeds from the sale of the 2008 Bonds were used (i) to finance or reimburse the City of Dover, Delaware 4-7 Burns & McDonnell

Paj 57

2014 Engineering Consultant’s Report Financial Assessment City for improvements to the City’s electric system; (ii) to fund a Debt Service Reserve Fund; and (4) to pay the costs of issuance of the 2008 Bonds. On November 17, 2010, the City issued $8,810,000 of Electric Revenue Refunding Bonds (Series 2010). The proceeds from the sale of the Series 2010 Bonds were used (i) to refund the Series 2004 Bonds, and (ii) to pay the costs of issuance of the Series 2010 Bonds. The non-taxable Series 2010 Bonds received an underlying rating of Aa2 by Moody’s Investors Services and an underlying rating of A+ by Fitch Ratings. Table 4-6 illustrates the debt service schedule for the Series 2008 and 2010 Bonds. The principal and interest and the annual total are shown for each series of bonds. At the time of issuance of the Series 2010 Bonds, the combined outstanding principal balance for both series of bonds was $30,280,000. Table 4-6: Debt Service Schedule of Electric Revenue Bonds 2008 Electric Revenue Bonds 2010 Electric Revenue Refunding Bonds Total Annual Period Principal Interest Debt Service Principal Interest Debt Service Debt Service FY 2014 430,000 986,454 1,416,454 1,740,000 219,100 1,959,100 3,375,554 FY 2015 450,000 964,954 1,414,954 1,810,000 166,900 1,976,900 3,391,854 FY 2016 475,000 942,454 1,417,454 1,890,000 94,500 1,984,500 3,401,954 FY 2017 695,000 918,704 1,613,704 - - - 1,613,704 FY 2018 730,000 883,954 1,613,954 - - - 1,613,954 FY 2019 765,000 847,454 1,612,454 - - - 1,612,454 FY 2020 800,000 815,706 1,615,706 - - - 1,615,706 FY21-34 16,325,000 6,618,185 22,943,185 - - - 22,943,185 Total $21,470,000 $ 15,013,223 $36,483,223 $ 8,810,000 $ 911,867 $ 9,721,867 $46,205,090 4.3 Insurance The City maintains a comprehensive insurance program to insure against varying types of liabilities and significant losses related to various Electric Division properties. Section 706 of the Resolution reads: "The City covenants that it will maintain a practical insurance program, with reasonable terms, conditions, provisions and costs, which the City Manager determines, with the approval of the Engineering Consultants, will afford adequate protection against loss, including loss of Revenues, caused by damage to or destruction of the Electric System or any part thereof and also comprehensive public liability insurance on the Electric System for bodily injury and property damage in such amounts as may be approved by the Engineering Consultants.” Table 4-7 summarizes itemized insurance coverage procured by the City for the period July 1, 2013, through June 30, 2014. Burns & McDonnell has reviewed this list of insurance, and in the opinion of City of Dover, Delaware 4-8 Burns & McDonnell

Paj 58

2014 Engineering Consultant’s Report Financial Assessment Burns & McDonnell, as Engineering Consultant and not as insurance counselor, the insurance in full force and affect appears to satisfy the requirements of Section 706 of the Resolution. Table 4-7: Schedule of Insurance Coverage in Effect July 1, 2013 - Starr Technical Risks Agency June 30, 2014 Coverage Property Earth Movement -Per Occurrence and in the $20,000,000 Annual Aggregate, except Earth Movement in High Hazard Earth Movement EXCLUDED Zones; Earth Movement in California; EXCLUDED Flood -Per Occurrence and in the Annual 10,000,000 Aggregate; Accounts Receivable; 100,000 Business Interruption; EXCLUDED Contingent Time Element Coverage; EXCLUDED Debris Removal (or 25% of Direct Property Loss, whichever the greater); 2,500,000 Demolition and Increased Cost of Construction; 10,000,000 EDP Media; 1,000,000 Errors and Omissions; 2,000,000 Expediting Expense; 1,000,000 Extra Expense, excluding replacement power or increased cost of generation, 2,000,000 transmission and/or distribution of electricity, water or natural gas; Fire Department Service Charges and Extinguishing Expenses; 500,000 Hazardous Substances -Per Occurrence and in the Annual Aggregate; 500,000 Inland Transit; 2,500,000 Newly Acquired Locations -90 Days reporting; 1,000,000 Personal Property Temporarily Off Premises; 100,000 Professional Fees; 250,000 Incidental Course of Construction; 5,000,000 Miscellaneous Unnamed Locations (except perils of Flood, Earth Movement and 500,000 Valuable Papers and Records; 100,000 Deductibles For each Occurrence giving rise to a claim under this policy, the Insured agrees to retain for its own account an initial amount of: In respect of Damage to Insured Property: $350,000 per Occurrence, except; $100,000 per Occurrence as respects Transit. In respect of Time Element loss (Extra Expense): 45 days per Occurrence, except; 72 hours per Occurrence in respect of Service Interruption. City of Dover, Delaware 4-9 Burns & McDonnell

Paj 59

2014 Engineering Consultant’s Report Financial Assessment July 1, 2013 - XL Insurance June 30, 2014 Coverage Property per Occurrence and in the Annual Aggregate in respect of Flood; $ 10,000,000 per Occurrence and in the Annual Aggregate in respect of Earth Movement, 20,000,000 Excluded. per Occurrence and in the Annual Aggregate applicable in High Hazard Movement zones; per Occurrence and in the Aggregate in respect Hazardous Substance; 500,000 per Occurrence in respect of Business Interruption; EXCLUDED per Occurrence in respect of Accounts Receivable; 100,000 per Occurrence in respect of scheduled, direct Contingent Time Element; EXCLUDED per Occurrence in respect of Incidental Course of Construction; 5,000,000 (or 25.00% of the direct physical loss, whichever greater) per Occurrence in 2,500,000 respect of Debris Removal; per Occurrence in respect of Demolition and Increased Cost of Construction; 10,000,000 per Occurrence in respect of Electronic Data Processing Media; 1,000,000 per Occurrence in respect of Errors and Omissions; 2,000,000 per Occurrence in respect of Expediting Expense; 1,000,000 per Occurrence in respect of Extra Expense excluding replacement power of 2,000,000 increased cost of generation, transmission and/or distribution of electricity, water or natural gas; per Occurrence in respect of Fire Department Service Charges and 500,000 Extinguishing Expenses; per Occurrence in respect of Newly Acquired Locations (ninety (90) days 1,000,000 reporting); per Occurrence in respect of property in Course of Inland Transit; 2,500,000 per Occurrence in respect of Miscellaneous Unnamed Locations, except: 500,000 Excluded. per Occurrence in respect of Flood; Excluded. per Occurrence in respect of Earth Movement; Excluded. per Occurrence in respect of Named Storm; per Occurrence in respect of Valuable Papers and Records; 100,000 per Occurrence in respect of Personal Property Temporarily Off Premise. 100,000 Deductibles / Retentions For each Occurrence giving rise to a claim under this policy, the Insured agrees to retain for its own account an initial amount of: In respect of Damage to Insured Property: $350,000, Per Occurrence, except; $100,000, per Occurrence as respect Transit; In respect of Time Element loss (Extra Expense): 45 days per Occurrence except; 72 hours Per Occurrence in respect of Service Interruption 4.4 Operating and Reserve Accounts The Electric Revenue Fund and the Electric Improvement & Extension (I&E) Fund are the City’s two funds devoted to the Electric Division. The funds are used to manage cash and transactions related to utility operations and capital expenditures, respectively. Each fund includes certain cash accounts established to make moneys available for specific purposes when they are needed. The accounts maintained within the Revenue and I&E Funds are listed herein. City of Dover, Delaware 4-10 Burns & McDonnell

Paj 60

2014 Engineering Consultant’s Report Financial Assessment Electric Revenue Fund  Insurance Reserve Account  Contingency Reserve Account  Electric Rate Stabilization Reserve Account  Interest and Sinking Account Electric Improvement & Extension Fund  Depreciation Reserve Account  Future Capacity Reserve Account The following are descriptions of each Fund, their respective accounts and their purposes. 4.4.1 Electric Revenue Fund The Electric Revenue Fund was established in Section 503 of the Resolution. All revenues are to be deposited into the Electric Revenue Fund when received. Current expenses are to be paid and other accounts are to be maintained from the Electric Revenue Fund. Moneys are transferred from the Electric Revenue Fund to the Electric Rate Stabilization Reserve Account, the Interest and Sinking Account, the I&E Fund, the Depreciation Reserve Account, and the Future Capacity Reserve Account. 4.4.1.1 Insurance Reserve Account The Insurance Reserve Account was established by the City to fund insurance deductibles in the event of loss(es) covered by the City’s insurance policies then in effect. The target minimum balance in the Insurance Reserve is $350,000. The reserve balance at the end of FY 2013 was $733,043. Dover will be proposing raising the minimum balance from $350,000 to $750,000 per insurance carrier recommendation in order to reduce premiums. This proposal will be taken to City Council in 2014. 4.4.1.2 Contingency Reserve Account The Contingency Reserve Account was established by the City in FY 2003 to provide for unplanned expenditures that may not be avoidable. The City’s Financial Policies require that a minimum balance be maintained in the Contingency Reserve Account equal to 1.0 percent of the current year revenues for the Electric Revenue Fund. The FY 2013 year-end balance was $814,236, which is equal to 0.92 percent of the FY 2013 revenues for the Electric Revenue Fund. City of Dover, Delaware 4-11 Burns & McDonnell

Paj 61

2014 Engineering Consultant’s Report Financial Assessment 4.4.1.3 Electric Rate Stabilization Account The Electric Rate Stabilization Reserve Account was established in FY 2005 to offset the costs of the power cost adjustment to the customers of Dover. The account’s target balance is a minimum of 3.0 percent, not to exceed 10.0 percent, of purchase power cost in any given year. Any excess of this amount will be refunded to customers in future years by reducing the rate of the power cost adjustment. The account’s FY 2013 end-of-year balance was $17,382,124, which was 31.2 percent of the FY 2013 purchased power cost. 4.4.1.4 Interest and Sinking Account The Interest and Sinking Account was established in Section 507 of the Resolution. This account consists of two restricted accounts: the Bond Service account and the Reserve Account. The Bond Service Account is funded with equal monthly transfers from the Electric Revenue Fund such that the balance, as of each payment date for interest or for principal and interest, will be equal to the amount of the payment due. The payments of principal and interest due on bonds are made from the Bond Service Account. The Reserve Account is funded by transfers from the Electric Revenue Fund, as necessary, to maintain a balance equal to the maximum combined principal and interest for any future fiscal year through the life of all bonds then outstanding. Moneys in the Reserve Account are used for paying interest on and principal of bonds when the balance in the Bond Service Account is insufficient for making those payments. Excess moneys in the Reserve Account are also used towards paying current interest payments. The total amount in the Restricted Accounts for the 2008 and 2010 bonds as of June 30, 2013, was $3,522,833. 4.4.2 Electric Improvement and Extension Fund The I&E Fund was established in Section 507 of the Resolution. Funds are added to the I&E Fund from the Electric Revenue Fund to the extent that the amount of funds available from the Electric Revenue Fund exceeds the total of the amounts required to be added to the Interest and Sinking Account. The I&E Fund also receives additional funding from the Depreciation Reserve Account, the Future Capacity Reserve Account, and from development receipts. Section 510 of the Resolution indicates that, except for certain situations, moneys held in the I&E Fund are to be used only for payment of costs of unusual maintenance or repairs, renewals or replacements, obtaining or replacing equipment, constructing extensions, additions, or improvements, and engineering expenses related to the foregoing activities. 4.4.2.1 Depreciation Reserve Account The Depreciation Reserve Account represents moneys that have been set aside for the sole purpose of funding renewals and replacements of the Electric System as components or equipment wear out, City of Dover, Delaware 4-12 Burns & McDonnell

Paj 62

2014 Engineering Consultant’s Report Financial Assessment deteriorate, or otherwise become unsuitable for the intended purpose. Transfers from the Electric Revenue Fund and investment earnings are the only sources of additional moneys for the Depreciation Reserve Account. Transfers to the I&E Fund are made as necessary to fund capital projects. The target appropriation for the Depreciation Reserve Account each year is the excess of depreciation expense for the year over the amount of principal included in debt service payments made during the year. The reserve balance at the end of FY 2013 was $9,855,704. 4.4.2.2 Future Capacity Reserve Account The Future Capacity Reserve Account was established to set aside and accumulate funds from the Electric Revenue Fund for use in evaluating and pursuing activities related to the Electric Division’s alternatives for power supply resources for future demand for electricity. The original target balance for this reserve was $5,000,000. The reserve balance at the end of FY 2013 was $10,004,190. Table 4-8 presents FY 2011 through FY 2013 year-end summaries of the activity within the cash accounts described above. The Insurance Reserve Account, the Contingency Reserve Account, the Electric Rate Stabilization Reserve Account, and the Interest and Sinking Account are accounts within the Electric Revenue Fund. The Depreciation Reserve Account and the Future Capacity Reserve Account are accounts within the I&E Fund. City of Dover, Delaware 4-13 Burns & McDonnell

Paj 63

2014 Engineering Consultant’s Report Financial Assessment Table 4-8: Reserve Account Activity and Balances Insurance Contingency Electric Rate Bond Depreciation Future Reserve Reserve Stabilization Reserve Reserve Capacity Account Account Account Account Account Account Year Ended June 30, 2011 Balance in Account on July 1 $ 396,530 $ 1,039,766 $ 4,776,519 $ 3,337,822 $ 8,021,155 $ 9,023,928 Receipts Interest Earned 6,804 17,022 83,648 108,665 141,066 154,843 Appropriations - - 1,300,000 3,588,881 2,250,000 - Total Funds Available $ 403,334 $ 1,056,788 $ 6,160,167 $ 7,035,368 $ 10,412,221 $ 9,178,771 Disbursements Debt Service Payments - - - (3,515,992) - - Transfer to Capital Projects - - - - - Balance in Account on June 30 $ 403,334 $ 1,056,788 $ 6,160,167 $ 3,519,376 $ 10,412,221 $ 9,178,771 Year Ended June 30, 2012 Balance in Account on July 1 $ 403,334 $ 1,056,788 $ 6,160,167 $ 3,519,376 $ 10,412,221 $ 9,178,771 Receipts Interest Earned 4,661 14,026 69,966 3,443 129,837 126,711 Appropriations - - 4,000,000 3,370,068 - - Total Funds Available $ 407,995 $ 1,070,814 $ 10,230,133 $ 6,892,886 $ 10,542,058 $ 9,305,482 Disbursements Debt Service Payments - - - (3,370,054) (500,000) - Transfer to Capital Projects (70,730) - - (300,000) 500,000 Balance in Account on June 30 $ 337,265 $ 1,070,814 $ 10,230,133 $ 3,522,833 $ 9,742,058 $ 9,805,482 Year Ended June 30, 2013 Balance in Account on July 1 $ 337,265 $ 1,070,814 $ 10,230,133 $ 3,522,833 $ 9,742,058 $ 9,805,482 Receipts Interest Earned 10,178 16,022 151,991 3,224 172,146 153,208 Appropriations 385,600 - 7,000,000 3,375,534 - 2,100,000 Total Funds Available $ 733,043 $ 1,086,836 $ 17,382,124 $ 6,901,591 $ 9,914,204 $ 12,058,690 Disbursements Debt Service Payments - (272,600) - (3,375,534) (58,500) (54,500) Transfer to Capital Projects - - - - (2,000,000) Balance in Account on June 30 $ 733,043 $ 814,236 $ 17,382,124 $ 3,526,057 $ 9,855,704 $ 10,004,190 City of Dover, Delaware 4-14 Burns & McDonnell

Paj 64

5.0 – CONCLUSIONS

Paj 65

2014 Engineering Consultant’s Report Conclusions 5.0 CONCLUSIONS In the preparation of this Engineering Consultant’s Report, Burns & McDonnell completed assessments of the electric generating stations and the transmission and distribution system of the City Electric Division. The investigations included interviews, observations, and reviews of FY 2013 expenditures and FY 2014 budgets. In addition, an analysis of the balances of the Improvement and Extension Fund and other funds benefiting the Electric Division was performed. Burns & McDonnell also reviewed the adequacy of the revenues provided by the current retail rates in relation to the requirements of the City of Dover, Delaware Resolution Authorizing and Securing Electric Revenue Bonds, adopted December 23, 1985. A high level assessment of the City’s insurance coverage related to the Electric Division was also completed. Based on these reviews and assessments, it is Burns & McDonnell’s opinion that: 1. The City’s power generation facilities are being operated and maintained consistent with accepted electric utility practice in the United States. 2. The design, construction, operation, and maintenance of the City's electric transmission and distribution system and the associated facilities are consistent with current generally accepted electric utility standards and over the past few years. The system has been upgraded in order to improve operation and service to customers. 3. The Electric Division capital projects included in the City’s Capital Investment Plan and the FY 2014 Operating Budget are necessary and should provide improved reliability and power quality for the Electric System. 4. The balances as of June 30, 2013 for the various reserve funds maintained by the City for the Electric Division appear to be sufficient for their defined purposes. 5. The insurance coverage in full force and affect as maintained by the City related to the various assets of the Electric Division appears to satisfy the requirements of Section 706 of the Resolution. 6. The electric revenues generated by the City’s current retail rates are more than sufficient to fulfill the debt service coverage requirement defined in Section 502(c) of the Resolution. City of Dover, Delaware 5-1 Burns & McDonnell

Paj 66

Burns & McDonnell World Headquarters 9400 Ward Parkway Missouri City, MO 64114 Phone: 816-333-9400 Fax: 816-333-3690 www.burnsmcd.com Burns & McDonnell: Making our clients successful for more than 100 years