Paj 1
REGULAR COUNCIL MEETING
AGENDA
REVISED TO INCLUDE THE RECOMMENDATIONS FOR ITEM #6A. - #6A.I
MAY 27, 2014 - 7:30 P.M .
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA
DOVER , DELAWARE
OPEN FORUM - 15 MINUTES PRIOR TO OFFICIAL MEETING (7:15 p.m.)
The “Open Forum” segment is provided to extend the opportunity to the general public to share
their questions, thoughts, comments, concerns, and complaints. Discussion of any item appearing
on the agenda as a public hearing is prohibited during the Open Forum as an opportunity will
be provided during consideration of that item. Citizen comments are limited to three (3) minutes.
Council is prohibited from taking action since they are not in official session; however, they may
schedule such items as regular agenda items and act upon them in the future.
INVOCATION BY REVEREND THEODORE HENDERSON
PLEDGE OF ALLEGIANCE LED BY COUNCILMAN PERZA
AGENDA ADDITIONS/DELETIONS
* CONSENT AGENDA
Those items on the Council Agenda which are considered routine and non-controversial are
marked with an asterisk (*) and will be acted upon by a single roll call vote of the Council. There
will be no separate discussion of these items unless a member of Council so requests, in which
event the matter shall be removed from the Consent Agenda and considered a separate item.
* 1. Adoption of Minutes - Annual Council Meeting of May 12, 2014
2. Public Hearings - Violation of Dangerous Building Ordinance
A. Property located at 45 South New Street, Owned by House of Pride
(Staff recommends: 1. Declaring this building and all accessory structures on this
property dangerous; 2. Ordering the property repaired or demolished by June 26, 2014
by the owner or equity owner at their own risk; 3. Ordering the Building Inspector to
cause the repair or demolition of the structures if not completed by the owner within 10
days of the date established by City Council; 4. Ordering the City Manager with the
assistance of the City Solicitor to cause the cost of repairs or demolition to be charged
against the land on which the building exists as a municipal lien or cause such cost to
be added to the tax duplicate as an assessment, or to be levied as a special tax, or to be
recovered in a suit at law against the owner.)
Paj 2
Council Agenda - May 27, 2014 Page 2
2. Public Hearings - Violation of Dangerous Building Ordinance (Continued)
B. Property located at 110 South New Street, Owned by House of Pride
(Staff recommends: 1. Declaring this building and all accessory structures on this
property dangerous; 2. Ordering the property repaired or demolished by June 26, 2014
by the owner or equity owner at their own risk; 3. Ordering the Building Inspector to
cause the repair or demolition of the structures if not completed by the owner within 10
days of the date established by City Council; 4. Ordering the City Manager with the
assistance of the City Solicitor to cause the cost of repairs or demolition to be charged
against the land on which the building exists as a municipal lien or cause such cost to
be added to the tax duplicate as an assessment, or to be levied as a special tax, or to be
recovered in a suit at law against the owner.)
* 3. Special Safety Advisory and Transportation Committee Report - May 12, 2014
A. Concerns Related to Permit Parking In Front of Wesley Pre-School and Education
Building
(Committee recommended that the matter be remanded back to staff to meet with
Wesley Church to consider the needs and assessments that need to be factored in
regarding the Church, its school, and its mission and that staff be authorized to proceed
with intermediate permit spot adjustments)
B. Discussion - Traffic Concerns on College Road (Request of Westminster Village)
(Committee action not required)
C. Update - Dover High School Construction
(Committee action not required)
* 4. Parks, Recreation, and Community Enhancement Committee Report - May 12, 2014
A. Proposed Ordinance #2014-08 - Amending Appendix B - Zoning - Article 3 - District
Regulations - Section 10 - Institutional and Office Zone (IO); Section 11 -
Neighborhood Commercial Zone (C-1); Section 12 - Limited Commercial Zone
(C-1A); Section 13 - Central Commercial Zone (C-2); Section 14 - Limited Central
Commercial Zone (C-2A); Section 15 - Service Commercial Zone (C-3); Section 16 -
Highway Commercial Zone (C-4); Section 26 - Commercial/Professional Office
Development District (C-PO); Article 4 - Zoning Bulk and Parking Regulations;
Article 10 - Planning Commission; and Article 12 - Definitions (See Item #12)
(On April 14, 2014, the Committee referred the ordinance back to staff to make
recommended changes and to clarify language for the Committee’s consideration
during their meeting of May 12, 2014)(Committee recommended adoption of
Proposed Ordinance #2014-08, as drafted by the Planning Department)
B. Updates
(Committee action not required)
Paj 3
Council Agenda - May 27, 2014 Page 3
* 5. Utility Committee Report - May 12, 2014
A. Capital School District Request to Transfer Equivalent Dwelling Unit (EDU) Credits
(Dover High School)
(Committee recommended approval of the transfer of Equivalent Dwelling Unit (EDU)
credits for the Capital School District from 1 Pat Lynn Drive to 1 Dover High Drive)
B. Annual Review and Approval of Governing Policy For Energy Commodity Risk
Management
(Committee recommended approval of the Governing Policy for Energy Commodity
Risk Management)
C. Quarterly Review of Utility Related Capital Investment Plan (CIP) (Electric and
Water/Wastewater)
(Committee action not required)
D. TEA/NAES Report (March)
(Committee recommended acceptance of the report)
E. Updates
(Committee action not required)
6. Legislative, Finance, and Administration Committee Report - May 12, 2014
* A. Downtown Dover Business Improvement District (BID) Budget and Assessment (Tax)
Rates for Fiscal Year 2014/2015
(Committee recommended approval of the proposed budget and assessment (tax) rates
for Fiscal Year 2014/2015)
* B. Discussion - Responsibilities and Reporting Structure for the Mayor and City
Manager and Continuation of Full-Time Status for the Position of Mayor
(Committee to continue discussion of this item following the 2014 Special Mayoral
Election)
* C. Proposed Planning and Inspections Fee Increases
(Committee deferred consideration of the proposed Planning and Inspections fee
increases to allow staff to contact the chamber of commerce and schedule a public
hearing)
* D. Authorization for New Position - Assistant City Manager
(Committee deferred )
* E. 2015 Property Revaluation and Reassessment
(Committee recommended approval to proceed with the 2015 Property Reassessment)
* F. FY14 Edward Byrne Justice Assistance Grant Program - Police Vehicle Computer
and Video Technology Upgrades
(Committee recommended approval of the grant project)
* G. Proposed Revenue Policy - Police Extra Duty/Voluntary Overtime
(Committee recommended adoption of the Revenue Policy - Police Extra
Duty/Voluntary Overtime)
Paj 4
Council Agenda - May 27, 2014 Page 4
6. Legislative, Finance, and Administration Committee Report - May 12, 2014 (Continued)
* H. Proposed Ordinances
h-1. #2014-09 Amending Chapter 50 - Floods; Chapter 22 - Buildings and Building
Regulations, Article III - Building Code, Section 22-61 - Adopted, (a)
International Building Code and International Residential Code Adopted; and
Appendix F - Fees and Fines (Sponsors: Perza and Townshend)(See Item #13-A)
(Committee recommended adoption of Proposed Ordinance #2014-09)
h-2. #2014-10 - FY 2014 Budget Amendment (Sponsors: Hutchison and
Mitchell)(See Item #13-B)
(Committee recommended adoption of Proposed Ordinance #2014-10)
h-3. #2014-14 Amending Appendix D - Downtown Dover Business Improvement
District (DDBID), Article III - Establishment of DDBID, Section 3 - Geographic
Boundaries, and Section 5 - Management Company (Sponsors: Lynn and
Townshend)(See Item #13-C)
(Committee recommended adoption of Proposed Ordinance #2014-14)
I. Proposed Reinstatement of the Fee Waiver Provision for Tax Exempt Properties
(Committee recommended that staff be requested to prepare an ordinance to reinstate
the incentives for tax exempt properties)
7. Set Public Hearing - Electric Fund Budget (Recommended that a Public Hearing be set for
June 9, 2014 at 7:30 p.m.)
8. Senate Bill No. 226 Amending Title 26 of the Delaware Code Relating to Public Utilities
* 9. Council President Appointments - 2014/2015 Committees (Annual Appointments Deferred
During the Meeting of May 12, 2014)
A. Legislative, Finance, and Administration Committee
B. Parks, Recreation, and Community Enhancement Committee
C. Safety Advisory and Transportation Committee
D. Utility Committee
E. Compensation Commission
F. Construction Code Appeals Committee
G. Other Post-Employment Benefits (OPEB) Trust Fund Board
H. Retirement Committee - General Employee Pension Plan
I. Retirement Committee - Police Pension Plan
* 10. 2014/15 Miscellaneous Appointments - Council President (Annual Appointments Deferred
During the Meeting of May 12, 2014)
A. Chamber of Commerce & Greater Dover Committee Liaison Members
B. City/County Committee (Liaison to Kent County)
C. Kent County Tourism
D. Central Delaware Economic Development Council (CDEDC) Liaison Member/Kent
Economic Partnership
* 11. Appointments Recommended by Council President Bonar - City Chaplains (Annual
Appointments to Expire May 2015)
A. Reverend Theodore A. Henderson of Dover Christian Church
B. Bishop Thomas L. Holsey of Bibleway Temple Church of God in Christ
Paj 5
Council Agenda - May 27, 2014 Page 5
12. First Reading of Proposed Ordinance #2014-08
The First Reading is offered on the Proposed Ordinance. Amendments to Appendix B -
Zoning require a Public Hearing. It is recommended for referral to the Planning
Commission on June 16, 2014, and that a Public Hearing be set for July 14, 2014 at
7:30 p.m., at which time the Final Reading and Council action will take place. Copies of
all proposed ordinances are available at the entrance of the Council Chambers or can be
obtained from the City Clerk’s Office.
A. Amending Appendix B - Zoning, Article 3 - District Regulations, Section 10 -
Institutional and Office Zone (IO); Section 11 - Neighborhood Commercial Zone
(C-1); Section 12 - Limited Commercial Zone (C-1A); Section 13 - Central
Commercial Zone (C-2); Section 14 - Limited Central Commercial Zone (C-2A);
Section 15 - Service Commercial Zone (C-3); Section 16 - Highway Commercial Zone
(C-4); Section 26 - Commercial/Professional Office Development District (C-PO);
Article 4 - Zoning Bulk and Parking Regulations; Article 10 - Planning Commission;
and Article 12 - Definitions
(Parks, Recreation, and Community Enhancement Committee)
13. First Reading - Proposed Ordinances
The First Reading is offered on the following proposed ordinances. The Final Reading
of the ordinances and action by Council will take place on June 9, 2014. Copies of all
proposed ordinances are available at the entrance of the Council Chambers or can be
obtained from the City Clerk's Office.
A. #2014-09 Amending Chapter 50 - Floods; Chapter 22 - Buildings and Building
Regulations, Article III - Building Code, Section 22-61; and Appendix F - Fees and
Fines
B. #2014-10 - FY 2014 Budget Amendment
C. #2014-14 Amending Appendix D - Downtown Dover Business Improvement District
(DDBID), Article III - Establishment of DDBID, Section 3 - Geographic Boundaries,
and Section 5 - Management Company
14. Proposed Ordinance #2014-05 With Planning Commission Amendment #1 (PC#1) and
Council Amendment #1 (C#1)
The Public Hearing and Final Reading of the proposed ordinance were accomplished
during the Council meeting of May 12, 2014, at which time it was tabled by Council.
Copies are available at the entrance of the Council Chambers.
A. #2014-05 With Planning Commission Amendment #1 (PC#1) and Council
Amendment #1 (C#1) Amending Appendix B - Zoning, Article 3 - District
Regulations, Section 2 - General Residence Zones (RG-1 and RG-2), Subsection 2.4
- Conditional Uses
15. Council Members’ Announcements
/tm
C:\Users\ddevine\Dropbox\05-27-2014 COUNCIL\05-27-2014 REVISED 05-25-2014.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO
CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Paj 6
ANNUAL COUNCIL MEETING
The Annual Council Meeting was held on May 12, 2014 at 7:30 p.m. with Mayor Bonar presiding.
Council members present were Mr. Anderson, Mr. Dixon, Mr. Lynn, Mr. Perza, Mr. Slavin,
Mrs. Williams, Mr. Hare, and Mr. Hutchison.
Council staff members present were Police Chief Bernat, Mrs. Mitchell, Mrs. Townshend,
Mr. Koenig, City Solicitor Rodriguez, and Mrs. McDowell.
The invocation was given by Bishop Thomas L. Holsey, followed by the Pledge of Allegiance.
AGENDA ADDITIONS/DELETIONS
Mr. Hutchison moved for approval of the agenda, seconded by Mrs. Williams and
unanimously carried.
Mr. Hare moved for approval of the Consent Agenda, seconded by Mr. Hutchison and carried
by a unanimous roll call vote.
ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF APRIL 28, 2014
The Minutes of the Regular Council Meeting of April 28, 2014 were unanimously approved
by motion of Mr. Hare, seconded by Mr. Hutchison and bore the written approval of
Mayor Bonar.
PROCLAMATION - COMMUNITY ACTION MONTH
The City Clerk read the following Proclamation into the record:
WHEREAS, Community Action Agencies were created when the Economic Opportunity Act of
1964 was signed into law and, currently, there are approximately one thousand such agencies serving
the underprivileged in the United States; and
WHEREAS, First State Community Action Agency has been committed to working with
individuals and communities to overcome the challenges of unemployment, homelessness,
substandard living conditions, and hunger in Delaware since 1965; and
WHEREAS, First State Community Action Agency has made an essential contribution to
individuals and families in Delaware by providing innovative and cost-effective programs that enable
them to improve their lives and living conditions; and
WHEREAS, Delaware and the entire country must continue to promote economic security and
ensure that all citizens are able to live with dignity by providing support and opportunities for those
in need of assistance.
NOW, THEREFORE, I, DAVID L. BONAR, MAYOR OF THE CITY OF DOVER,
DELAWARE, do hereby proclaim May 2014 as COMMUNITY ACTION MONTH in the City
of Dover in recognition of the hard work and dedication of First State Community Action Agency.
Paj 7
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 2
Mayor Bonar presented the Proclamation to Ms. Bernice Edwards, Executive Director of First State
Community Action Agency, and relayed appreciation for the work provided for the betterment of
the community.
Ms. Edwards thanked the Mayor and Council for recognizing the First State Community Action
Agency and for their continued support.
PROCLAMATION - PUBLIC WORKS WEEK
The City Clerk read the following Proclamation into the record:
WHEREAS, public works services are an integral part of our community and citizens' everyday
lives, and the support of an understanding and informed citizenry is vital to the efficient operation
of public works systems and programs such as facilities management, fleet maintenance, grounds
and parks maintenance, solid waste collection and recycling, street and stormwater management,
water production, and water and wastewater operations and maintenance; and
WHEREAS, the health, safety, and comfort of this community greatly depend on these facilities and
services and the quality and effectiveness of these facilities and services, as well as their engineering,
construction, and inspection, are vitally dependent upon the efforts and efficiency of the qualified
and dedicated personnel of the Department of Public Works; and
WHEREAS, The American Public Works Association 2014 National Public Works Week theme
"Building for Today, Planning for Tomorrow" represents the classic idea of stewardship embodied
by the profession of public works and the professionals that practice it. Focusing on the
communities; "building" points out the day to day aspect of public works that is quality of life, while
"planning" references the sustainable practices that ensure the quality of life for future generations.
NOW, THEREFORE, I, DAVID L. BONAR, MAYOR OF THE CITY OF DOVER,
DELAWARE, do hereby proclaim May 18th - 24th, 2014 as Public Works Week in the City of
Dover and urge all citizens and organizations to learn more about the details involved in providing
public services and to recognize the contributions that our dedicated public works employees make
every day to our health, safety, comfort, and quality of life.
Mayor Bonar presented the Proclamation to Mrs. Sharon Duca, Public Works Director, and relayed
appreciation for the departments’ efforts to assure continued service to the residents of Dover.
Ms. Duca thanked the Mayor and Council for taking the time to recognize the Department of Public
Works, as many communities are doing across the country for National Public Works Week. She
stated that it is an honor for her to work with so many dedicated and qualified individuals who
tirelessly aim to provide key services related to the City’s public health and safety.
Mrs. Duca stated that the Department of Public Works consists of 87 staff members who provide
sanitation services for approximately 11,000 accounts; maintenance of over 140 miles of streets and
storm drains; maintenance of 215 acres of public grounds, design of 47 flowerbeds, and maintenance
of thousands of street trees; operation and maintenance of 22 well sites, including a large water plant
and 15 micro plants; production of an average 1.5B gallons of potable water per year; maintenance
Paj 8
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 3
of over 190 miles of water main; maintenance of over 180 miles of sanitary sewer main and
operation and maintenance of 40 wastewater pumping stations; operation and maintenance of 18
principal facilities; maintenance of a fleet of 188; administration of a nearly $10M operating budget;
and the engineering and inspection of an annual $4M capital plan. Mrs. Duca thanked the men and
women of the Department of Public Works for their efforts and dedication.
REPEALING, RESCINDING, OR AMENDING RESOLUTION NO. 2014-07 APPOINTING
THE VICE-MAYOR AS MAYOR UNTIL THE MAYOR'S POSITION IS FILLED AND
RATIFYING ACTION ALREADY TAKEN
Mr. Anderson stated that he believed that Council acted in haste when they adopted
Resolution No. 2014-07 on April 28, 2014 because the term for the Council President expires during
this meeting. In order to have a full choice for the election of the Council President, he suggested
repealing the Resolution.
Mr. Anderson moved that Resolution No. 2014-07 be repealed, notwithstanding, all actions that were
taken under that Resolution be ratified. The motion was seconded by Mrs. Williams.
Responding to Mr. Lynn, Mr. Bonar stated that he signed proclamations, tributes, financial
documents, and the closing documents for the Uzin Utz property, as presented by staff members.
He also attended DEMA meetings to determine funding for emergency management resources and
various civic functions.
Mr. Lynn asked if a list of actions had been generated for circulation to Council since they were
being asked to ratify them. Mr. Bonar stated that he did not recall having been asked to submit a list.
Mr. Lynn stated that he took exception to this (action) for a number of reasons and cautioned
members that, pursuant to Section 13 of the City of Dover Charter (Vacancies; forfeiture of office;
filling of vacancies, (b) Forfeiture of office), a council member shall forfeit that office if the council
member: (2) violates any express prohibition of this charter. He stated that the Charter mandates
specifically in Section 15 that (The council president and vice-mayor shall retain his/her right to
vote as councilman at all times although he/she may be acting as the mayor,) “unless the mayors
absence appears to be indefinite or extended, in which case council shall pass a resolution appointing
the vice-mayor as mayor until the mayor's position is either filled in accordance with section 13
hereof or the mayor returns to his/her duties,” (which resolution shall provide that the vice-mayor
shall have the right to approve or disapprove council action in accordance with section 10 hereof,
in which case the vice-mayor shall lose his/her vote as councilman until further action is taken by
council.) Mr. Lynn stated that this was a statutory construction matter. Council passed the
Resolution making the Vice-Mayor the Mayor because of the indefinite or extended absence of
Mayor Carey and the Charter tells them that the only two (2) circumstances within which they may
rescind that action are: the Mayor’s position is either filled or the Mayor returns to his/her duties.
Mr. Lynn noted that neither of those conditions had been met and this action would be in direct
contravention of the City Charter. He suggested that this action is expressly prohibited by Robert’s
Rules of Evidence, which views rescissions of motions or resolutions as an abhorrence. For
example, if they vote to paint the barn red and the barn is then painted red, and the next meeting they
vote to rescind the action, it cannot be undone. Mr. Lynn stated that they could not undo making the
Vice-Mayor the Mayor.
Paj 9
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 4
Responding to Mr. Hare, City Solicitor Nicholas H. Rodriguez stated that he and Councilman Lynn
had gone back and forth all week and he disagrees with Mr. Lynn’s interpretation of the Charter.
He noted that a written opinion had been provided to the City Clerk (as on file in the Office of the
City Clerk), which states that, because the Mayoral election has been set for June 17, 2014 and the
newly elected mayor will be sworn into office on June 25, 2014, the absence of the mayor is no
longer indefinite and the rescinding action would be permitted. Mr. Rodriguez also noted that the
motion to rescind conforms with Robert’s Rules of Order (11th Edition), Section 35, which states that
you cannot rescind a motion that has caused an action that is impossible to undo, which does not
apply in this situation.
A call for the question by Mrs. Williams was carried by a roll call vote of five (5) yes (Dixon,
Perza, Williams, Hare, and Hutchison) and three (3) no (Anderson, Lynn, and Slavin).
The motion to repeal Resolution No. 2014-07 failed by a roll call vote of four (4) yes (Anderson,
Williams, Hare, and Hutchison) and four (4) no (Dixon, Lynn, Perza, and Slavin).
ELECTION OF COUNCIL PRESIDENT/VICE-MAYOR
Mr. Perza moved that nominations be made from the floor, rather than by ballot. The motion
was seconded by Mr. Anderson and unanimously carried.
Mr. Perza moved to nominate David L. Bonar to serve as Council President/Vice-Mayor for
2014/2015, seconded by Mr. Hutchison.
Mr. Lynn reminded members that only a sitting member of Council could be nominated for Council
President and, since Mr. Bonar had been appointed as the Mayor with adoption of Resolution
No. 2014-07, he was not eligible for nomination.
Mr. Lynn moved to nominate Timothy A. Slavin to serve as Council President/Vice-Mayor for
2014/2015, seconded by Mr. Slavin.
Mrs. Williams moved to nominate William F. Hare to serve as Council President/Vice-Mayor for
2014/2015, seconded by Mr. Anderson.
Mr. Hutchison moved to close nominations for Council President/Vice-Mayor, seconded by
Mr. Lynn and unanimously carried.
At the request of Mr. Hare, paper election ballots were provided to each member of Council. Mayor
Bonar requested that members cast their votes for Council President/Vice-Mayor and place their
ballots in the envelope to be submitted to the City Solicitor for the tallying of results. He reminded
members that the nominees were Mr. Slavin and Mr. Hare.
Mr. Anderson moved to take a three (3) minute recess, seconded by Mr. Hare and carried by
unanimous consent.
Meeting recessed at 7:59 p.m. and reconvened at 8:03 p.m.
Paj 10
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 5
Mayor Bonar announced that one (1) ballot had been left unmarked. Mr. Anderson recalled that the
Charter provides the right to abstain.
City Solicitor Rodriguez announced that Mr. Hare received four (4) votes and Mr. Slavin received
two (2) votes for Council President/Vice-Mayor.
Mayor Bonar announced that he would resign as Mayor, effective immediately, thereby becoming
eligible for the Council President/Vice-Mayor election.
Mr. Perza moved to nominate David L. Bonar as Council President/Vice-Mayor for 2014/2015,
seconded by Mr. Hutchison.
Mr. Anderson moved to nominate Timothy A. Slavin as Council President/Vice-Mayor for
2014/2015, seconded by Mr. Lynn.
Responding to Mr. Lynn, City Solicitor Rodriguez stated that the resignation of Mr. Bonar as Mayor
returns him to his seat on Council and resolves the issue of his eligibility for nomination as Council
President/Vice-Mayor.
Mrs. Williams moved to close nominations for Council President/Vice-Mayor, seconded by
Mr. Perza and unanimously carried.
Mr. Slavin withdrew his name from nomination.
Mr. Lynn stated that, because Mr. Bonar had resigned as Mayor and the Mayor presides at the
Annual Meeting, Mr. Bonar should no longer preside over the meeting. Mr. Slavin noted that the
Charter was designed to govern them in all circumstances and the farther they drift away from it, the
more trouble they will get themselves into.
Mr. Bonar relinquished the Chair to Mrs. Williams to conduct the election for Council
President/Vice-Mayor.
Mr. Slavin moved for a roll call, seconded by Mr. Hare and carried by a roll call vote of six (6)
yes (Anderson, Perza, Bonar, Hare, Hutchison and Williams), two (2) no (Lynn and Slavin),
and one (1) abstention (Dixon).
By a roll call vote of eight (8) yes (Anderson, Dixon, Perza, Slavin, Bonar, Hare, Hutchison,
and Williams) and one (1) abstention (Lynn), David L. Bonar was elected to serve as Council
President/Vice-Mayor for 2014/2015.
PROPOSED RESOLUTION NO. 2014-10 APPOINTING THE VICE-MAYOR AS MAYOR
UNTIL THE MAYOR’S POSITION IS FILLED
Mr. Slavin suggested that, since the period of time for the Mayor’s absence is no longer indefinite
and the Council President/Vice-Mayor acts as Mayor during the vacancy, the adoption of the
Resolution was not necessary. City Solicitor Rodriguez concurred and no action was taken.
Paj 11
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 6
PUBLIC HEARING/FINAL READING OF PROPOSED ORDINANCES AMENDING
APPENDIX B - ZONING, ARTICLE 3 - DISTRICT REGULATIONS
A public hearing was duly advertised for this time and place to consider proposed zoning text
amendments to Appendix B - Zoning, Article 3 - District Regulations, Section 2 - General Residence
Zones (RG-1 and RG-2), Subsection 2.4 - Conditional Uses, and Section 17 - Shopping Center
Development (Permitted Uses) of the Dover Code.
Mr. Hare moved that the Final Reading of the proposed ordinances be acknowledged by title
only, seconded by Mr. Dixon and unanimously carried. (The First Reading of the ordinances
was accomplished during the Council Meeting of March 24, 2014.)
Proposed Ordinance #2014-05 With Planning Commission Amendment #1 (PC#1) Amending
Section 2 - General Residence Zones (RG-1 and RG-2), Subsection 2.4 - Conditional Uses
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that the text amendments would allow for professional offices as a conditional use within the
General Residence Zones, with very strict criteria, on State Street and Governors Avenue between
Mary and Water Streets and on the entirety of Route 8. She noted that the Planning Commission
unanimously recommended adoption of the ordinance with two (2) amendments: 1. Reduce the
maximum number of employees from six to four; and 2. Limit the applicability of the proposed
ordinance to Route 8 only.
Council President Bonar declared the hearing open.
Mr. Joseph D'Urso, 305 North State Street, requested clarification of the area affected by the
ordinance amendment. Responding, Mrs. Townshend stated that, if the Planning Commission’s
proposed amendments are adopted, it would only be applicable to Route 8.
Mrs. Yvonne Hall, 228 North State Street, stated that she did not believe four (4) parking spaces
would be enough for a business. She felt that the people parking on the streets would suffer because
of the maximum proposed parking. Mrs. Townshend responded that this would be a very small
operation with no more than four (4) employees.
There being no one else present wishing to speak during the public hearing, Council President Bonar
declared the hearing closed.
Mr. Hutchison moved for adoption of Planning Commission Amendment #1 (PC#1) to Proposed
Ordinance #2014-05, seconded by Mrs. Williams.
Mr. Anderson stated that he was opposed to PC#1 because it was limited to Route 8. He felt that
the City should encourage the micro-businesses that will not be disruptive.
The motion for adoption of Planning Commission Amendment #1 to Proposed Ordinance #2014-05
failed by a roll call vote of five (5) no (Anderson, Dixon, Lynn, Perza, and Hare) and four (4) yes
(Slavin, Williams, Hutchison, and Bonar).
Mr. Slavin moved to table action on Proposed Ordinance #2014-05, seconded by Mr. Lynn.
Paj 12
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 7
Mr. Slavin noted that he has heard from numerous constituents who did not want this extended to
the residential area of North State Street. He noted that he worked very hard to ensure that they
attended the Planning Commission to have their concerns heard. Mr. Slavin suggested that they
deliberate with those residents before proceeding.
The motion to table action on Proposed Ordinance #2014-05 was carried by a roll call vote of
eight (8) yes (Dixon, Lynn, Perza, Slavin, Williams, Hare, Hutchison, and Bonar) and one (1)
no (Anderson).
Proposed Ordinance #2014-06 With Planning Commission Amendment #1 (PC#1) Amending
Section 17 - Shopping Center Development (Permitted Uses)
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that the text amendments originally proposed would have added new uses to the Shopping Center
Development (SC-1, SC-2, and S-C3) zones and the Community Shopping Center (SC-2) zone. She
noted that, during the Planning Commission meeting, the applicant requesting to allow apartments
as part of a mixed use development withdrew the request. As a result, the Planning Commission
proposed amendments to remove the language related to that request from the ordinance amendment.
Council President Bonar declared the hearing open and, with no one present wishing to speak, the
public hearing was closed.
Mr. Hare moved for adoption of Planning Commission Amendment #1 (PC#1) to Proposed
Ordinance #2014-06. The motion was seconded by Mr. Hutchison and carried by a unanimous
roll call vote.
Mr. Slavin moved for adoption of the ordinance, as amended. The motion was seconded by
Mr. Dixon and, by a unanimous roll call vote, Council adopted Ordinance #2014-06, as
follows:
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
COUNCIL MET:
That Appendix B - Zoning, Article 3 - District Regulations, Section 17 - Shopping Center
Development [(SC-1, SC-2 and SC-3)], Subsection 17.32 be amended by adding a new paragraph 6
to read as follows:
6. Light motor vehicle service accessory to a permitted use, provided that all work is
completed inside a building and that no automobiles are stored outside.
ADOPTED: MAY 12, 2014
Paj 13
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 8
AUTHORIZATION TO EXECUTE SETTLEMENT AGREEMENTS RELATED TO
EMPLOYEE GRIEVANCES
Council President Bonar read the following statement into the record:
“During the first week of March, James Hosfelt, who was serving as the City’s Chief
of Police, announced his retirement. Under the City’s Charter, the Mayor is
responsible for selecting a new Chief of Police when the position becomes vacant.
In light of Chief Hosfelt’s retirement, and the Charter provision addressing the
selection of the Chief of Police, former Mayor Carlton Carey began to consider
candidates to serve as the City’s next Chief of Police.
On March 25, former Mayor Carey announced that he had selected then-Deputy
Chief Paul Bernat to serve as the next Chief of Police, and he further announced that
the appointment would become effective on April 4.
The newly appointed Chief of Police Bernat, who has the authority under
Department
policy to select the Deputy Chief of Police, announced that Lieutenant Marvin Mailey
would serve as the new Deputy Chief of Police.
During the period of time between April 4, when Chief Bernat’s selection became
effective, and April 8, five employee grievances were filed by high-ranking officers
in the Police Department. The officers who filed the grievances included two
captains (Captain Robert Scott and Captain Tim Stump), and three lieutenants
(Lieutenant Dan McKeown, Lieutenant Jason Pires, and Lieutenant J. Eric
Richardson).
In his grievance, Captain Scott alleged that:
The way in which the selection of the Deputy Chief occurred was in
contravention of the customs, policies, and practices of the City of Dover and
the City of Dover Police Department. This selection also was in direct
violation of the City of Dover’s Equal Employment Opportunity and
Affirmative Action policy as well as the federal and Delaware State laws
prohibiting race discrimination in employment decisions, including
promotions.
Captain Scott further alleged that although he expressed an interest in being
promoted, he “was not selected due to [his] race, Caucasian” and that “the
candidate selected for Deputy Chief was chosen because of his race,
African-American.”
In each of their individual grievances, Captain Stump, and Lieutenants McKeown,
Pires, and Richardson alleged:
Paj 14
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 9
I feel that Mayor Carey being involved and/or insisting that Marvin Mailey
be promoted to Major is unprecedented and completely contrary to the past
promotional patterns established by the Dover Police Department.
In his individual grievance, Captain Stump stated that he is “a white male” and
alleged that “based upon [his] race and color, [his] opportunity to be promoted to
the ranks of Deputy Chief and/or Chief of Police was adversely affected.”
In his individual grievance, Lieutenant McKeown alleged that he “was unfairly
prevented from advancing to the rank of Captain/Major due solely to [his] race
which is Caucasian.”
In his individual grievance, Lieutenant Pires alleged that he “believe[s] that due to
[his] ethnicity and that [sic] fact that [he is] bi-racial [he] was discriminated
against and the opportunity to be promoted was not afforded to [him] for those
reasons.”
In his individual grievance, Lieutenant Richardson alleged that “due to [his] race
and
color of [his] skin [he] was discriminated against and the opportunity to be
promoted was not available to [him] for those reasons.”
When the grievances were advanced to Police Chief Bernat, he conferred with City
Council to determine if the grievances could be resolved. City Council reviewed the
grievances and the facts and circumstances leading up to the selection of the new
Chief of Police and the new Deputy Chief of Police. That review raised serious
questions about whether the former Mayor—in contravention of the Police
Department’s promotion policy—exceeded his authority and orchestrated a series
of events to ensure then-Lieutenant Marvin Mailey would be elevated to the position
of Deputy Chief of Police. Mayor Carey denied these allegations.
In view of the allegations made in the grievances, the potential exposure to the City
if the allegations were proven to be true, and City Council’s concern over actions
alleged to have been taken by then-Mayor Carey, City Council requested that the
Mayor resign from his public office.
Without conceding the veracity of the allegations that had been made against him,
less than two days after being asked, former Mayor Carey submitted a letter of
resignation to City Council.
With the five grievances still pending, the City’s attorneys and management team
entered into settlement negotiations with the officers and their Fraternal Order of
Police affiliated representative. With the authorization of City Council by its May 12
formal vote, the five grievances have been resolved through an agreement to make
monetary payments from the City to each of the officers in amounts totaling three
hundred thousand dollars ($300,000).
Paj 15
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 10
If true, the alleged actions taken by former Mayor Carey demonstrate employment
practices rejected by the City of Dover and its management. While the City embraces
diversification, and equal opportunity in the workplace, discriminatory acts—even
if the result is well intentioned—are unacceptable.
Having received and accepted the resignation of former Mayor Carey and having
resolved the police officer grievances, City Council looks forward to brighter
moments for our City. Chief of Police Paul Bernat and Deputy Chief of Police
Marvin Mailey have the full support and confidence of City Council as they move the
Police Department past these unfortunate and difficult events, and lead the Police
Department in a way that maintains its distinction as one of the top police
departments in the entire Country.”
Mr. Slavin noted that this was an unsettling issue for all involved; however, in the best interest of
the City, and based upon the advice they received, this is the most economical resolution.
Mr. Anderson stated that, based on the advice of counsel, the cost to defend this number of suits
separately would exceed the amount of the settlement and this is probably the least worst option
available to them.
Mrs. Williams moved for approval of the settlement agreement (as on file in the Office of the
City Clerk), seconded by Mr. Dixon and carried by a roll call vote of eight (8) yes (Anderson,
Dixon, Lynn, Slavin, Williams, Hare, Hutchison, and Bonar) and one (1) no (Perza).
Mrs. Williams moved to authorize Council President/Vice-Mayor Acting Bonar to execute the
settlement agreement. The motion was seconded by Mr. Hutchison and carried by a roll call
vote of eight (8) yes (Anderson, Dixon, Perza, Slavin, Williams, Hare, Hutchison, and Bonar)
and one (1) no (Lynn).
STATE OF THE CITY MESSAGE
Mayor David L. Bonar presented the State of the City Message (Exhibit #1).
MONTHLY REPORTS - MARCH 2014
By motion of Mr. Hare, seconded by Mr. Hutchison, the following monthly reports were
accepted by consent agenda:
City Assessor's Report
City Manager's Report
City Planner's Report
Controller/Treasurer's Budget Report
Economic Development Office Report
Fire Chief's Report
Police Chief's Report (February and March)
Paj 16
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 11
QUARTERLY REVIEW OF CAPITAL INVESTMENT PLAN (CIP) (JANUARY,
FEBRUARY, AND MARCH)
Members were provided a Project Tracking Report, as of March 31, 2014, for the Capital Investment
Plan (CIP).
By consent agenda, Mr. Hare moved for acceptance of the Quarterly CIP Report, seconded
by Mr. Hutchison and carried by a unanimous roll call vote.
2014/15 STAFF APPOINTMENTS - CITY COUNCIL
Mr. Hutchison moved for approval of the Staff Appointments for 2014/2015, seconded by
Mr. Hare and, by a unanimous roll call vote, the following appointments were made:
City Assessor - Cheryl A. Russell
Building Inspector - Ann Marie Townshend
City Clerk - Traci A. McDowell
Assistant City Clerk - Denise L. Devine
Controller/Treasurer - Donna S. Mitchell
Assistant Finance Director - Vacant
Assistant Treasurers - Traci A. McDowell
- Denise L. Devine
Interim Fire Marshal - Timothy P. Mullaney, Jr.
City Planner - Ann Marie Townshend
City Solicitor - Nicholas H. Rodriguez
Deputy City Solicitor - William W. Pepper, Sr.
2014/15 COMMITTEE APPOINTMENTS - COUNCIL PRESIDENT
Council President Bonar requested that the 2014/2015 Council President Committee Appointments
be deferred.
Mr. Anderson moved to defer the Council President Committee Appointments for 2014/2015
until the next Regular Council Meeting, seconded by Mr. Hare and carried by a unanimous
roll call vote.
1M. ISCELLANEOUS APPOINTMENTS - COUNCIL PRESIDENT
Council President Bonar requested that the 2014/2015 Council President Miscellaneous
Appointments be deferred.
Mr. Perza moved to defer the Council President Miscellaneous Appointments for 2014/2015
until the next Regular Council Meeting, seconded by Mr. Anderson and carried by a
unanimous roll call vote.
COMMITTEE APPOINTMENTS - MAYOR
Mr. Slavin moved to defer the Mayor’s Committee Appointments for 2014/2015 until the newly
elected Mayor is sworn in. The motion was seconded by Mrs. Williams and carried by a
unanimous roll call vote.
Paj 17
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 12
PROPOSED RESOLUTION NO. 2014-08 APPROVING THE 2014 COMMUNITY
DEVELOPMENT BLOCK GRANT ACTION PLAN
By consent agenda, Mr. Hare moved for adoption of Resolution No. 2014-08 Approving the
2014 Community Development Block Grant (CDBG) Action Plan, seconded by Mr. Hutchison,
and by a unanimous roll call vote, Council adopted Resolution No. 2014-08, as follows:
A RESOLUTION PROPOSING APPROVAL OF THE 2014 COMMUNITY
DEVELOPMENT BLOCK GRANT ACTION PLAN
WHEREAS, the City of Dover is entitled to $226,472 through the United States Department of
Housing and Urban Development Community Development Block Grant program; and
WHEREAS, the City of Dover has prepared the 2014 Action Plan, in accordance with the United
States Department of Housing and Urban Development guidelines, that serve as the primary planning
document for identifying and meeting the housing and community development needs for the low
and moderate-income residents of Dover; and
WHEREAS, the City of Dover is in favor of utilizing the Community Development Block Grant
funds for the community development purposes in accordance with the National Community
Development objectives of benefitting low and moderate income families, eliminating slums and
blight, and meeting other community development objectives; and
WHEREAS, the United States Department of Housing and Urban Development requires the City
of Dover to submit a Consolidated Plan and an Action Plan for Application for Federal Assistance
including the proposed use of funds and including certain certifications and policies to obtain its
$226,472 entitlement; and use of $8,554 in program income for eligible activities; and
NOW, THEREFORE, BE IT RESOLVED That the Mayor and Council of the City of Dover
approve the 2014 Community Development Block Grant Action Plan and application for Federal
Assistance included in the Action Plan, along with certifications and policies attached and authorize
its forwarding to the United States Department of Housing and Urban Development for
consideration.
ADOPTED: May 12, 2014
PROPOSED RESOLUTION NO. 2014-09 AUTHORIZING SIGNATURES FOR BANKING
SERVICES ON BEHALF OF THE CITY OF DOVER, DELAWARE -
CONTROLLER/TREASURER AND ASSISTANT TREASURERS
By consent agenda, Mr. Hare moved for adoption of the Proposed Resolution, seconded by
Mr. Hutchison, and by a unanimous roll call vote, Council adopted Resolution No. 2014-09,
as follows:
Paj 18
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 13
A RESOLUTION AUTHORIZING SIGNATURES FOR BANKING SERVICES ON
BEHALF OF THE CITY OF DOVER, DELAWARE
WHEREAS, the City of Dover's investment policy includes the investment of funds up to $100,000
per banking institution, investments in the State of Delaware Investment Pool, and the purchase and
sale of U.S. Treasury and agency securities; and
WHEREAS, the banking institutions, brokerage firms, trust companies, and other various financial
institutions require an Authorizing Resolution for the opening of accounts, and for purchasing,
selling, transferring, assigning, and handling securities;
NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the City of Dover, that
the Controller/Treasurer and Assistant Treasurers are hereby authorized to open accounts with
banking institutions and purchase, sell, transfer, assign, and handle securities and that they are
authorized to sign all related forms;
BE IT FURTHER RESOLVED that the transactions in these accounts be carried out with any one
signature; and
That the following are the office holders authorized for these purposes, until further notice:
Donna S. Mitchell - Controller/Treasurer
Traci A. McDowell - Assistant Treasurer
Denise L. Devine - Assistant Treasurer
ADOPTED: MAY 12, 2014
EVALUATION OF BIDS - VANSANT CAPACITY IMPROVEMENT EQUIPMENT
SUPPLY PROCUREMENT
Mr. Vincent Scire, PE l Plant Manager with NAES Corporation, advised members that the major part
of the VanSant Capacity Increase CIP scope of work is the procurement of an engineered wet
compression system and the startup commissioning of that equipment. This proposed contract
addresses the engineering design, equipment supply, and installation support activities associated
with the wet compression system. He noted that this system installation will increase the capacity
of the VanSant combustion turbine generator by 6 megawatts from its current rated capacity of
39 megawatts. This contract work represents a significant portion of the work to be performed on
this project. The remaining major portion of the scope to include the installation of the system and
testing will be managed by NAES using a combination of support personnel and contractors. At this
time staff is confident this project will be under budget.
A Request for Proposal package was advertised according to the City purchasing policy and NAES
purchasing policy. A mandatory Pre-bid meeting was also advertised and three (3) potential
respondents attended this meeting; two (2) bids were received; one (1) declined to bid. The proposals
were evaluated using cost, experience, completeness of bid, and guaranteed capacity increase and
emissions limits. Of the two bids received, one Bidder (Wood Group) did not provide guarantee of
Paj 19
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 14
emissions and their bid was deemed to be non- conforming. Only one bidder, Mee Industries, Inc.
met criteria for capacity increase and provided an emissions guarantee. That bidder also provided
the lowest evaluated bid.
Based upon the evaluation prepared by consultant McHale Performance, the City Manager and
Controller recommended awarding the contract to Mee Industries, Inc. for $294,435.00 for Option 2.
NAES will perform the remaining work at a cost of $113,306 bringing the total cost of this portion
of the project in at $407,741.
Mrs. Williams moved for approval of Staff’s recommendation, seconded by Mr. Dixon and
carried by a unanimous roll call vote.
EVALUATION OF PROPOSALS - WELLHEAD REDEVELOPMENT PROGRAM
CONTRACT
Mr. Scott Koenig, City Manager, reminded members that this item was deferred by City Council on
April 28, 2014 to allow him an opportunity to discuss the 10% per year escalator with the low bidder,
A.C. Schultes of Delaware, Inc. He advised members that they have agreed to reduce the annual
escalator to 3.5%.
The Department of Public Works maintains multiyear contracts with potential contractors to ensure
that the bidding rules are adhered to for any contractors that might be hired to perform work for the
Department. These contracts are priced as a “time, equipment, and material” contract and may
exceed $25,000 annually. This contract will provide for the rehabilitation and repair of twenty (20)
production wells in an effort to maintain operations and/or increase the yield of each well as it relates
to the permitted allocation. The recommended contractor will perform flow testing of each well and
provide a report detailing testing results as well as recommendations. Upon reviewing information
provided by the contractor, the City of Dover will plan for and/or schedule further repairs as needed
based upon the prices provided.
A Request for Proposal (RFP) was advertised according to the City purchasing policy by the City’s
Purchasing Agent under RFP #14-0034PW. One (1) contractor submitted a qualified proposal. The
proposals were evaluated using the following criteria: demonstrated experience with similar projects
including a history of achieving highest and best results among its peers; cost; previous projects in
the City of Dover; and availability to perform duties. Staff reviewed the proposal from A.C. Schultes
and concluded that the pricing was fair and the proposal was complete. Originally, A.C. Schultes of
Delaware, Inc included a 10% annual escalator, after further discussion they have agreed to reduce
the annual escalator to 3.5%.
A.C. Schultes of Delaware, Inc. submitted all of the contractor’s qualification information, which
included a list of recently completed projects similar in scope, as well as a financial statement that
were all found to be adequate. In conclusion, staff recommends awarding a three (3) year agreement,
with the City option of two (2), one (1) year extensions, for the Wellhead Redevelopment Multiyear
Contract to A.C. Schultes of Delaware, Inc.
Paj 20
ANNUAL CITY COUNCIL MEETING OF MAY 12, 2014 PAGE 15
Staff recommended awarding a three (3) year agreement, with the City option of two (2), one (1) year
extensions, for the Wellhead Redevelopment Multiyear Contract to A.C. Schultes of Delaware, Inc.
as per the pricing included in the bid submittal.
Mrs. Williams moved for approval of staff’s recommendation, seconded by Mr. Hare and
carried by a unanimous roll call vote.
Responding to Mr. Slavin, Mr. Koenig stated that only one (1) bid was originally received; therefore,
it was not necessary to rebid in order to negotiate the adjustment to the escalator.
COUNCIL MEMBERS’ ANNOUNCEMENTS
Mr. Hutchison announced that Master Corporal Keith Hester is being recognized as an outstanding
resource officer for the Capital School District.
Council President Bonar stated that he would not be seeking re-election to City Council, nor any
other political office, once his term expires. He noted that it has been a very trying couple of weeks,
being especially hard on the Police Department. Mr. Bonar noted that Carleton Carey served the
public for more than 50 years and he deserves our respect as the former Mayor and a member of the
community.
By unanimous consent, the Meeting Adjourned at 9:08 p.m.
TRACI A. McDOWELL
CITY CLERK
All orders, ordinances, and resolutions adopted by City Council during their Annual Meeting of
May 12, 2014, are hereby approved.
DAVID L. BONAR
COUNCIL PRESIDENT/
VICE-MAYOR ACTING
/TM
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Council-Minutes\2014\05-12-2014 ANNUAL.wpd
Exhibit
Exhibit #1 - State of the City Message
Paj 21
EXHIBIT #1
Annual Council Meeting of 05/12/2014
Madam President, my colleagues on Council, Mr. Koenig, employees of the City of
Dover, members of our community and the media, I would like to take a moment
to reflect on where we were this past year and the vision I hope most of us share
as we move forward through the rest of 2014 and into 2015.
It is my pleasure to speak to you all serving as the mayor of the great city of
Dover. We have seen some changes recently, however before I continue I also
owe a debt of gratitude to my wife for being understanding and supportive as I
have accepted a few more responsibilities in the recent weeks, and for Council
President Beverly Williams for also stepping in to serve as Council President.
I want to recognize our city employees who put forth a valiant effort daily to try
to keep costs down to a minimum for all of our constituents. We have seen a
slight increase over the past couple of years for example to cover the costs of
trash and recycling pickups, due to increased landfill expenses. We have
economized our operations through identifications of efficiencies and stream
lining processes. We are “going green” for our customers, requesting them to sign
up for e-billing for their utilities and taxes. A customer can now receive an email
notification, and have the option to view and pay their bill directly online. We
Paj 22
have changed it so our customers using a credit/debit or e-check are not paying a
fee, making it affordable and easy for everyone to access.
We are also fortunate that we continue to see growth in our community as many
places are not as prosperous. We have the new Dover High School being finished
and opening this fall, we have the growth at the Garrison Oak Technical Park with
Calpine and most recently with Uzin Utz; U-Floor Systems that will be breaking
ground this month. Philipp Utz, President of Uzin Utz Manufacturing North
America Inc. has stated on more than one occasion that his company (and I
quote) “could have built their manufacturing plant anywhere on the east coast,
but chose Dover because of the hard work and commitment of city staff to make
it happen and the business friendly environment created by the partnership
between the City of Dover, State of Delaware and Kent County.” This is the type
of partner building that makes for a successful Economic Development Office and
for successful growth in our community. Last March, the DDP hired a full time
Executive Director, which allowed the Economic Development Manager to focus
on city wide initiatives. This proved very timely as we attracted two
manufacturing facilities; we also sent out to bid and awarded the infrastructure
improvements. The city has been able to work with Kent County in developing a
future food innovation district in Dover, although still in the planning stages, it has
Paj 23
great potential for future job growth. Our primary focus will remain to attract
new businesses while aiding existing businesses in being successful.
The Planning and Inspections Department has continued to respond to the
challenges of the economic recession, while also responding to the signs of strong
economic growth. In 2013, Grottos, Dick’s Sporting Goods, Royal Farms, Redners,
and Green Turtle all opened after either new construction or extensive renovation
in the City. Additionally, the planning and construction of the new Dover High
School has been a continuing priority. The City has provided leadership to ensure
that sidewalks and a safe crossing of Route 8 are in place when the school opens
in August. The cooperation and leadership of DelDOT has also been instrumental
in keeping this project on track. Code Enforcement staff has continued to stay
busy with vacant and dangerous buildings, as well as daily property maintenance
enforcement. The City demolished 13 dangerous buildings in 2013. Another six
were demolished by property owners and five were repaired by property owners
due to the City’s enforcement. At the end of 2013, the city has 303 registered
vacant buildings.
The Parks & Recreation Department has worked to expand programming and
provide flexibility to meet the varying needs of our customer base. The addition
Paj 24
of early morning fitness classes, the implementation of a flexible fitness pass
program, and the expansion of our summer day camp offerings have all helped to
meet the diversity of City residents and residents of the surrounding area. In a
cost saving measure, our news print program has been replaced with school
flyers, Facebook and e-mail blasts. In the next year, we hope to expand our social
media presence. We will also be rolling out our on-line registration in the next
couple of months and look forward to the feedback from the recreation needs
assessment to continue to improve our offerings.
The Dover Public Library is approaching its second anniversary of life in the new
building. Our mission states: Delaware libraries are leaders in connecting and
inspiring a lifetime of discovery. The mission of the Dover Public Library is to
connect people to a variety of resources and services that inform, educate and
entertain. We are a quality of life entity and we believe that cultural and
educational enrichment and information is the key to a successful and balanced
life for our citizens.
With our creative and committed staff and in our new facility, we are working
towards fulfilling that mission. The community is responding; and it is a very busy
Paj 25
place. Statewide we continue to have the highest computer usage (in-house and
wireless); and we rank within the top five of busiest circulation libraries.
Our staff understands and is committed to the philosophy that we serve all
people. And our services must be diverse enough to meet a variety of needs and
interests. Daily we scan the horizon for developing library services and technology
that enhances our work and the peoples’ access to information.
We have endured many changes including some outside of our control with the
rigid temperatures and substantial amounts of precipitation this past winter, it
proved to me that all the work our electric department has put in to improving
our system reliability has really paid off as there were very few issues in
continuous supply of electric to our community. Our Public Works Department
Crews worked many overnight hours trying to keep the roads clear, and maintain
services to our constituents. As the Public Works Department moves towards
accreditation ensuring we continue to meet and exceed the national standards
and practices, they continue to look for efficiencies in their operations while
providing outstanding service throughout the community. Department of Public
Works is committed to protecting the health, safety, and welfare of the public.
Our staff is equally committed to improving our operations, maintenance,
Paj 26
rehabilitation, and replacement of our city public infrastructure. As the stewards
of the cities physical infrastructure the department is committed to putting forth
the effort to provide a sustainable environment and infrastructure for generations
to come.
For the 6th year in a row, our Electric Department earned the RP3 Platinum
Designation which is earned by the American Public Power Association. The RP3
program recognizes utilities that demonstrate high proficiency in reliability,
safety, work force development and system improvement. The new LED street
lighting was installed in the Woodcrest Subdivision and on Rt. 13 to promote the
“Going Green” campaign, while the infrastructure was completed for the new
Dover high School and the Calpine Project. The construction rebuild has started at
the Horsepond Substation increasing the Southeast Dover area electric reliability
and the 69 line will begin in FY 15 to increase the protection of lines that will aid
in decreasing the size of an area affected should an issue occur in the system. I am
proud of the work accomplished by our Departments and look forward to the
improvements coming.
Paj 27
Still, we continue to move forward trying to keep everything as budget friendly
for our community while providing the level of service all of you appreciate and
expect.
This year through our Assessor’s office we had 382 senior citizens and 39 disabled
citizens benefit from our Property Reduction Program. There was a .36% increase
in value from last year due to building permit activity, annexations and new
construction. The taxable valuation for FY 2014 was $3,164,734,200 (this amount
does not reflect the reduction in value for those who benefitted from the
Property Reduction Program.) Our current tax rate is .3378 cents per $100 and
our values are based on the last reassessment conducted in 2010. Staff continues
to actively review property data to ensure accuracy for the next citywide
reassessment.
Dover Police Department said a fond farewell to Chief James Hosfelt and we
welcomed Captain Paul Bernat as our new Chief. In 2013, the Dover Police
Department handled 380 less complaints than 2012 and Group A and Violent
Crimes were down for the 3rd straight year. The Dover Police Department cleared
68.2% of robberies and 58.1% of burglaries which greatly exceeds the national
averages for these types of crimes. The Drugs, Vice and Organized Crime Section
Paj 28
(D.V.O.C.) accounted for 1,663 proactive arrests involving drugs, prostitution and
counterfeit merchandise. As a result of these arrests, the D.V.O.C. were able to
seize 42,987 grams of marijuana, 1,095 grams of cocaine, 308 grams of heroin,
1,398 prescription pills and $128,307.00 in currency. Along with illegal drugs and
money, the D.V.O.C. also seized and removed from our streets, 77 handguns, 21
rifles, 8 shotguns and over 10,000 rounds of ammunition. The number of traffic
arrests increased by 13% as compared to the 2012. Traffic crashes increased
slightly by 3%. The use of social media has proven to be a valuable tool for Dover
PD. It has aided in the arrest and conviction of several criminals, and the feedback
received from the community is outstanding.
While striving to maintain quality services, city departments have come up with
many innovative ways to find efficiencies, assisting in workloads of other
departments and maintain a positive helpful attitude as they take great pride in
serving all of you.
My hope is that we continue to move forward in a positive direction, that we
embrace the changes, accept the challenges and work together as a team. One
saying I use often in conversation and is included at the end of each email is
“Don’t tell me the reasons it won’t work, tell me the one reason it will.” That is
Paj 29
what this city council and the employees have embraced. They accepted the
challenge to find solutions, to streamline processes to reduce expenses where
they can. Now it comes to the point where working with the City Manager, and
the Finance Director conversations will continue as we look at any additional
areas where we can reduce in order to save without cutting the services that we
all appreciate, expect and rely upon.
My hope continues that each person who resides in the City of Dover feels they
have a voice, feels they have support and a clear understanding of what we do
and why, and that we all continue to work together on solving the problems and
issues that arise, building unity and forming a strong front.
So I will leave you once again with my final thought…Don’t tell me the reasons it
won’t work, tell me the one reason it will.
Thank you and good night.
Paj 38
SPECIAL SAFETY ADVISORY AND TRANSPORTATION
COMMITTEE
A Special Safety Advisory and Transportation Committee Meeting was held on May 12, 2014 at
2:01 p.m. with Chairman Hutchison presiding. Members present were Mr. Dixon (arrived at 2:17 p.m.),
Mr. Perza (arrived at 2:06 p.m., departed at 2:36 p.m., returned at 2:42 p.m.), and Mr. Keller.
Councilman Anderson was also present.
AGENDA ADDITIONS/DELETIONS
Once a quorum was present, Mr. Keller moved for approval of the agenda, seconded by
Mr. Dixon and unanimously carried.
Concerns Related to Permit Parking In Front of Wesley Pre-School and Education Building
Members were advised that the Downtown Dover Partnership (DDP) acquired and renovated the
property located at 22-24 W. Loockerman Street. A lease was negotiated with Transcore, the State
of Delaware’s vendor for E-ZPass, and E-ZPass opened at this location in early March. In order to
accommodate E-ZPass employees’ parking needs, the DDP included the guarantee of 85 parking
spaces in the North Street and Bradford Street parking lots for use by E-ZPass employees. This
allocation of parking permits caused the City and DDP to work together to reallocate permit,
metered, and free two (2) hour parking within the existing municipal lots managed by the DDP. To
balance the need for customer parking with employee parking, the City Manager and City Planner
jointly decided to convert 13 parking spaces in what is known as “A-Street Lot” from free two (2)
hour parking to permit parking. Without making this change, there would be insufficient parking in
the Bradford Street Lot to accommodate both employees and visitors.
The A-Street Lot was utilized for City employee parking for approximately 18 months during the
construction of the Dover Public Library. During this time, the City received no complaints and
observed no operational issues with this allocation of parking. Prior to, and since designating 13
permit spaces in this area on March 1, 2014, staff continued to monitor this area and regularly
observed open parking among the two (2) hour spaces.
Tenants of the Wesley Church Education Building and the Wesley Pre-School expressed concern
with the allocation of permit parking in this area, which was previously free two (2) hour parking.
No other municipal lot in the area could accommodate the 13 permits. Staff recommended that the
permit parking remain as currently configured. If the Committee and Council wished to reconfigure
parking in response to the concerns, staff recommended consideration of the following options:
1. Move the mailbox from the current location to the library parking lot near the
post office.
2. Remove large holly trees from the landscape island to allow better access to
parallel parking spaces on either side of the island. Plant landscaping that has
less conflict with vegetation.
3. Move permit parking from the angled parking spaces to the parallel parking
spaces on either side of the island. Some permit spaces would still be necessary
in the angled parking area.
Paj 39
SPECIAL SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF MAY 12, 2014 PAGE 2
Mrs. Ann Marie Townshend, Director of Planning and Community Development, explained that
there were a total of 24 parking spaces in the area being discussed: 20 parking spaces in the A-Street
Lot (13 designated for permit parking, six (6) for two (2) hour free parking, and one (1) for
handicapped parking) and four (4) additional two (2) hour free parallel spots on the Loockerman
Street side of the median. She noted that if the holly trees located on the median are not trimmed
well, inconvenience is caused for those parking in three (3) of the spaces on the south side of the
median. She noted that placement of the drive-through mailbox took away one (1) parking space
on the south side of the median.
Mrs. Townshend advised members that when the parking needs and availability of the larger area
were examined, there was a need to move 13 permit spots from the Barros, McNamara, Malkiewicz
and Taylor, PA law firm (located on the corner of Loockerman and State Streets) to the A-Street Lot
because they could not be absorbed in the lots on the west side of State Street. Staff talked to the
Wesley United Methodist Church a couple of weeks prior to implementing this change and looked
at other options; however, they were unable to come up with anything that would resolve the issue.
Mrs. Townshend suggested that members hear what the public has to say regarding this topic and
that the matter be referred to staff to determine if other configurations would address the specific
problems. She stated that, in order to address the issue, staff needed to understand better the actual
concerns to determine if parking was not available or if parking spots were not convenient.
Mr. Hutchison stated his understanding that Wesley United Methodist Church was looking for a
compromise whereby three (3) to five (5) parking spaces could be made available. He questioned
if the post office box could be placed in an alternative location and if there was some flexibility to
provide spaces for the church. He reminded members that the Church had been at its location for
well over 100 years, had made contributions to the community, and that the Church also brought
business downtown.
Mr. Scott Koenig, City Manager, stated that staff had tried to keep all the permit parking spots
adjacent to each other to avoid multiple conflicting messages in terms of signage. He noted that
re-striping had been discussed; however, he felt that significant re-striping would likely involve
consultation with the Delaware Department of Transportation (DelDOT). Mr. Koenig stated that
staff had not looked at alternative sites for the mailbox. He indicated that the site plan for the Dover
Public Library anticipated that the mailbox would be put in a spot similar to its previous location;
however, this entrance/exit was very congested. He suggested that there may be better alternative
locations.
Mr. Anderson expressed his opinion that taking all of the slots in front of the church had caused
“angst” and inquired if a few slots could be open to the church and others reserved for permit
parking. Responding, Mr. Koenig reiterated that splitting parking designations could cause a need
for additional parking signage and difficulties with adherence. He felt the current method provided
the easiest, clearest message, but this could be altered if it was Council’s wish.
Paj 40
SPECIAL SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF MAY 12, 2014 PAGE 3
Mr. Perza advised members that he had attended the Wesley Preschool as a child and his daughter
now attends the school; therefore he was familiar with the purpose of this portion of the parking lot
and the spots used to drop off children. He indicated that he did not see the link between these spots
and the parking situation on Loockerman Street two (2) to three (3) blocks west. He felt that the
situation should be fixed so as not to disrupt the historic use of Wesley Church and the preschool
and stated his desire to find a solution to accomplish this.
Mr. Dave Casto, 8 Gregory Court, Chair of Trustees, Wesley United Methodist Church, explained
that he understood what the City was going through and this was one of the reasons that the Church
had been willing to compromise from the beginning. However, he felt that perhaps compromising
rather than stating that the Church did not want parking permits in this area at all had been a mistake.
He asked members to imagine a business or private, non-profit, enterprise that offered many
programs suddenly having 10 parking spots in front of their building taken, noting that he was
unaware of any other location in the City where this had occurred. Mr. Casto indicated that this
came as a shock to the Church, as they were not involved in the planning processes or informed of
what was going on. He stated that one (1) meeting was held the morning that related signs were put
up, after the signs were erected. Mr. Casto advised members that a number of individuals utilize the
building for different programs and that some of these programs would be expanding. He stated that
the availability of two (2) hour parking would allow the church to serve the developmentally disabled
and to operate its Clothing Closet. He explained that, at times, parking is not available in close
proximity to the church. Mr. Casto expressed his opinion that the Barros, McNamara, Malkiewicz,
and Taylor, PA law firm should have made arrangements for their own parking when they moved
across the street, rather than having parking spots taken from the Church. He advised members that
the Church had always been a good partner with the City, allowing use of their parking for Dover
Days, the Schwartz Center, etc.
Dr. Joyce Denman, Supervisor of Special Education, Capital School District, explained that the
District’s Student Transition to Adult Readiness (STAR) program was started during the previous
year to serve students aged 18-21 with significant disabilities who are eligible for public school
services. Since being in a school facility with students aged 14-18 was deemed inappropriate for
these students, the Wesley Education Building site was selected due to its location near the Dover
Public Library and close proximity to community events. The first complete successful year for the
program had concluded and parents, teachers, and paraprofessionals were pleased with the setting.
Dr. Denman stated that service personnel, including a psychologist, speech language pathologist,
physical therapist, occupational therapists, and administrators, come to the site for short visits every
day to provide services. These individuals are on very tight schedules because they work at several
sites and convenient parking is important to allow them to complete 30-minute sessions and go to
their next assignment. In addition, food service providers deliver breakfast, and subsequently lunch,
at this location each day.
Mr. Alex Vaughan, 509 Dyke Branch Road, Trustee, Wesley United Methodist Church, requested
clarification regarding the path that brought those present to the current meeting and what led to the
“path that was taken last December” (parking changes that were made in the A-Street Lot).
Responding, Mr. Hutchison stated that the City was considering parking spaces needed in the
downtown area. He stated that this included Wesley United Methodist Church and that parking was
being discussed in this context.
Paj 41
SPECIAL SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF MAY 12, 2014 PAGE 4
Mr. Vaughan stated that, as a trustee, his interest was from an administrative standpoint. He stated
he was aware that the parking spaces had something to do with the Barros, McNamara, Malkiewicz
and Taylor, PA law firm, but was also led to believe that it had something to do with the new
E-ZPass offices on Loockerman Street. He stated his belief that the history of this parking situation
went back many years to when the DDP had facilitated acquiring the former Woolworth’s building
that now houses E-ZPass. Mr. Vaughan did not understand why the parking concerns being
discussed were not addressed at the time this project was undertaken.
Mr. Hutchison stated that the City of Dover and DDP had made a commitment to work with E-ZPass
to bring new jobs downtown and to work with the State of Delaware to accomplish this. He
expressed his hope that the City could work with Wesley United Methodist Church to get the
situation resolved.
Mr. Vaughan hoped this would be the result, but stated concern that the Church was not brought into
the conversation in December 2013 when staff began addressing the parking concerns. He felt that
the parking issues that caused the reallocation of these spaces began several years ago and that
leaving the Church out of the discussion was not good neighborhood relations.
In response, Mr. Hutchison stated that he had discussed this matter earlier in the day with
Mrs. Townshend and Mr. Koenig, and they were well on the way to addressing the concerns
expressed. Mr. Vaughan stated that the Church was looking forward to being part of the process.
Mr. David Evans, Co-Lay Leader of Wesley United Methodist Church, 388 Clark Farm Road,
Smyrna, advised members that approximately 95-96% of the Church’s service is work for those less
fortunate and this work is done out of the Wesley Education Building. He noted that the Clothing
Closet serves hundreds of needy people who do not have clothes and likely do not have cars;
therefore, they must be driven to the Clothes Closet where it is difficult to find a parking spot. In
addition, he estimated that 20 people come to the building every Tuesday at 7:00 a.m. for a Bible
study, noting that, at 68 years old, he is one of the youngest attendees. Mr. Evans advised members
that he had pulled a gentleman from the holly bushes referred to previously because he stumbled
getting out of his car. He felt that it might not have become an issue and Church representatives
would not be attending the meeting if someone had approached them first regarding this matter
instead of assuming that the parking spots were not being used, and if the church had explained that
95% of their outreach to needy people was done out of this building. However, he stated that
parking was now an issue and a critical need for the individuals who need these services the most.
Mr. Jack Royston, 44 Philchrist Drive, expressed concurrence with the comments of the previous
speakers, including the need for better communication “with our friends and neighbors.” He stated
appreciation for the City taking the time to look into the problem and expressed his hope that it
would be resolved in an amicable way.
Reverend Amy Yarnall, 140 Hazel Road, indicated that her views had been expressed and stated her
appreciation for the City’s consideration of this issue.
Paj 42
SPECIAL SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF MAY 12, 2014 PAGE 5
Mr. Keller stated that he sympathized with the Church and advised those present that the City would
do its very best.
Mr. Hutchison recommended a 45-day delay on the current issue, which would give Mr. Koenig and
Mrs. Townshend an opportunity to come back to members with a proposal.
Responding to Mr. Perza regarding the reason for the 45-day time period, Mrs. Townshend stated
that the Committee’s current special meeting was being held at the beginning of the month rather
than the normal meeting date on the fourth Monday of the month. It was planned to bring the issue
back to the Committee at the end of June so that staff could sort through possible scenarios.
Mr. Hutchison inquired if something could be done to assist the church in addressing their immediate
issues before 45 days. He noted that the correspondence he received regarding this issue indicated
a need for three (3) to five (5) parking spaces.
Mrs. Townshend stated that there were on-street parking spaces further west on Loockerman Street
adjacent to the building owned by Barros, McNamara, Malkiewicz and Taylor, PA and indicated that
some of the permit spaces could be shifted to that area. She stated that five (5) to seven (7), and
possibly eight (8) spaces could be accommodated if this area were designated for permit parking.
Mr. Koenig stated that this could be done; however, he was unsure what the unintended
consequences could be.
Reverend Yarnall advised members that the STAR and Wesley Preschool programs would not be
operating at full capacity during the summer and wanted everyone to realize this if studies regarding
parking would be conducted in the summertime.
Responding to Mr. Keller as to whether the Barros, McNamara, Malkiewicz and Taylor, PA law firm
should also be notified, Mrs. Townshend stated that the law firm was well aware of the issues.
Mr. Perza moved that the matter be remanded back to staff to meet with Wesley Church to
consider the needs and assessments that need to be factored in regarding the Church, its
school, and its mission and that staff be authorized to proceed with intermediate permit spot
adjustments, seconded by Mr. Dixon and unanimously carried.
Discussion - Traffic Concerns on College Road (Request of Westminster Village)
Mrs. Ann Marie Townshend, Director of Planning and Community Development, stated that there
had been a request from a resident at Westminster Village to signalize the exit from Westminster
Village onto College Road that lines up with North Dover Elementary School. This request was sent
to the Delaware Department of Transportation (DelDOT) traffic section to determine if this was
something that they could look at and to analyze crash data. DelDOT determined that a signal would
not have prevented any of the accidents that occurred at this location and did not find that a signal
was warranted. Mrs. Townshend advised members that there were continual issues with congestion
and speeding on the stretch of College Road extending from the University Courtyard Apartments
to the Woodlands of Fox Hall. She recommended reaching out to the DelDOT traffic section and
Paj 43
SPECIAL SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF MAY 12, 2014 PAGE 6
the Dover/Kent County Metropolitan Planning Organization (MPO) to perform a traffic study in that
area to look at traffic counts and measures that could be put in place to help facilitate better flow of
traffic. Mrs. Townshend noted that McKee and College Road were both DelDOT roads and that
DelDOT would need to implement any changes.
Mr. Hutchison suggested that staff have DelDOT look at the area due to the large number of students
walking between the apartments and the University on a daily basis. Mrs. Townshend concurred,
stating that pedestrian issues and efficient traffic flow were both concerns in the area.
Update - Dover High School Construction
Mrs. Ann Marie Townshend, Director of Planning and Community Development, stated that the
Capital School District (CSD) had been working with the Fire Marshal’s Office to complete fire
alarm testing so that furniture could be moved into Dover High School later in May. It was hoped
that testing would be complete by the end of the current week, and from a building code standpoint,
furniture could then be moved in. It was hoped that a temporary Certificate of Occupancy (CO)
would be issued in June: however, Mrs. Townshend expressed some concerns, noting that the
Department of Natural Resources and Environmental Control (DNREC) would not agree to a
temporary CO until stormwater violations were resolved. She stated that monthly coordination
meetings were continuing, with some interim meetings being held regarding stormwater. The
stormwater outfall under Route 8 was expected to be finished within the next couple of days, with
construction on the east entrance to begin shortly after. Mrs. Townshend stated that staff had advised
the CSD that the east entrance did not need to be entirely complete for the temporary CO to be
issued, but the school could not open for the year without its completion. The temporary CO would
be very specific as to moving in, setting up, and getting things in place. She noted that DelDOT was
getting ready to move forward on the sidewalks and installation of the High-Intensity Activated
CrossWalk (HAWK) signal. All but one (1) property owner had signed the easements needed and
a more difficult route must be taken to acquire the construction easement for this owner’s property.
Responding to Mr. Hutchison regarding the stormwater requirements, Mrs. Townshend stated that
DNREC was the controlling factor in regard to stormwater issues and that going against DNREC
would jeopardize the City’s status as a regulated community under the stormwater program.
Mrs. Townshend stated that staff was working very closely with DRNEC and EDiS to make sure
these issues are resolved as quickly as possible. She noted that wet weather and the very cold and
snowy winter had made the project difficult.
Noting that the southern segment of Dover High Drive and its connection to Tribbett Road must be
completed before school opens in September, Mr. Hutchison questioned if staff had issued a written
document to that effect. Responding, Mrs. Townshend stated that this had not been done because
stormwater appeared to be the biggest concern. However, she concurred that the City was at the
point that issues related to the roadway should be put in writing because the roadway is critical.
Noting the importance of the safety of the children, Mr. Keller questioned if the completion of
sidewalk construction and the installation of the HAWK signal would be required for a CO.
Mrs. Townshend stated that these aspects were under DelDOT’s control, rather than the CSD’s;
Paj 44
SPECIAL SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF MAY 12, 2014 PAGE 7
however, DelDOT was fairly confident that the HAWK signal and the bulk of the sidewalks would
be in place by August. She indicated that no plans had been made to bus the children to school if
sidewalks were not completed, but if there were not a safe walking route to school, the CSD would
have to provide bus transportation.
Responding to Mr. Hutchison, Mrs. Townshend confirmed that the sidewalks under discussion were
on the north side of Route 8. It was her belief that, ultimately, sidewalks would be needed on the
south side also, as well as on Mifflin Road.
In response to Mr. Keller, Mrs. Townshend stated her recollection that approximately 200 children
would be using the HAWK signal, although parents may transport some of these children.
Mr. Perza questioned if the CSD was aware that they would not be permitted to open the school until
all requirements were completed, regardless of whether these requirements were the responsibility
of DelDOT or other parties. He expressed the desire to ensure that nothing “slips through the
cracks” and that the CSD is made aware of all requirements. Responding, Mrs. Townshend
indicated that these requirements had been stated at the coordination meetings during the past
three (3) months; however, she concurred that putting them in writing would be worthwhile. She
stated that EdiS had assured staff that the project would be complete.
Mr. Perza expressed a desire to intervene and to avoid “finger pointing” and stated that the bottom
line is that children cannot go into the school until it is safe, regardless of who gets it done. He
stated he wished to create a record now in this regard. Concurring, Mrs. Townshend stated that the
City could not sign off on the project if it were not safe.
Mr. Perza moved for adjournment, seconded by Mr. Keller and unanimously carried.
Meeting adjourned at 2:52 p.m.
James L. Hutchison, Sr.
Chairman
JLH/JS/dd/tm
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Minutes\2014\05-12-2014 SA&T.wpd
Paj 45
PARKS, RECREATION, AND
COMMUNITY ENHANCEMENT COMMITTEE
The Parks, Recreation, and Community Enhancement Committee Meeting was held on
May 12, 2014, at 3:01 p.m. with Chairman Dixon presiding. Members present were Mr. Hutchison,
Mr. Perza, Mr. Caldwell, and Mrs. Horsey (arrived at 3:02).
AGENDA ADDITIONS/DELETIONS
Councilman Hutchison moved for approval of the agenda, seconded by Mr. Caldwell and
unanimously carried.
Proposed Ordinance #2014-08 - Amending Appendix B - Zoning - Article 3 - District
Regulations - Section 10 - Institutional and Office Zone (IO); Section 11 - Neighborhood
Commercial Zone (C-1); Section 12 - Limited Commercial Zone (C-1A); Section 13 - Central
Commercial Zone (C-2); Section 14 - Limited Central Commercial Zone (C-2A); Section
15 - Service Commercial Zone (C-3); Section 16 - Highway Commercial Zone (C-4);
Section 26 - Commercial/Professional Office Development District (C-PO); Article 4 - Zoning
Bulk and Parking Regulations; Article 10 - Planning Commission; and Article 12 - Definitions
During the Parks, Recreation, and Community Enhancement Committee meeting held on
April 14, 2014, members considered Proposed Ordinance #2014-08. After much discussion,
members recommended that Proposed Ordinance #2014-08 be referred back to staff for a final read
through to make recommended changes and clarify language, and returned to the Parks, Recreation,
and Community Enhancement Committee on May 12, 2014. City Council approved the
Committee’s recommendation during their regular meeting held on April 28, 2014.
During the Parks, Recreation, and Community Enhancement Committee meeting on May 12, 2014,
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that Proposed Ordinance #2014-08 was before the Committee in its original draft format with no
revisions since the previous meeting.
Mrs. Townshend stated that she had met with Councilman Perza regarding this matter to address the
concerns he expressed during the previous meeting. Mrs. Townshend explained that, historically,
when staff proposed zoning text amendments without involving the regulated community, they were
often directed to do so before any action could be taken. As a result, the decision was made to
approach the Central Delaware Chamber of Commerce (CDCC), the Kent County Association of
Realtors, and other members of the community to review the commercial and office zone ordinances
to obtain input before bringing the amendments before Council. A little over a year was spent
reviewing the ordinances in great detail and each section was scrutinized in an effort to simplify the
zoning ordinance and to broaden specific uses to more general use categories. She stated that
another goal was to address consistency from one section to another. Bulk standards were also
examined, since experience had shown that these standards were causing good design to be set aside
because of setback requirements. It was noted that the Planning Commission had the authority to
determine if the circulation on the site did not work well. Thresholds for projects that must be
considered by the Planning Commission were also considered.
Paj 46
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF MAY 12, 2014 PAGE 2
Mrs. Townshend indicated that more clarification might be needed in Lines 414-420 of the ordinance
to make it clear that new buildings would be treated differently than existing buildings.
Mrs. Townshend stated that, to this point, primary discussions had been through the CDCC and the
real estate community. Mr. Keith Cooker, Landmark Engineering, and Mr. Bob McLeish,
Lighthouse Construction, participated on behalf of homebuilders. She stated that she had spoken
with downtown merchants to inform them of the proposed changes. She reminded members that
two (2) public hearings would be held regarding the ordinance, one (1) before the Planning
Commission and one (1) before City Council; therefore there would be opportunities for the public
to share its concerns.
In reference to his original concerns in terms of clarity of some sections of the Proposed Ordinance,
particularly Section 2.11(a)-(c), Mr. Perza stated that, after meeting with Mrs. Townshend, reviewing
the historic process, and understanding the additional steps that would include opportunities for
public input before any changes were made, he withdrew his objection to moving forward to Council
with the draft Ordinance as presented.
Mr. Perza moved to recommend adoption of Proposed Ordinance #2014-08, as drafted by the
Planning Department, seconded by Mrs. Horsey and unanimously carried.
Updates
Community Development Block Grant (CDBG) Program
Mrs. Tracey Harvey, Planner I, advised the Committee that the staff had met the U. S. Housing and
Urban Development (HUD) Department’s timeliness standard for expenditure of Community
Development Block Grant (CDBG) funds and that all funds were expended 60 days prior to the end
of FY 14.
Mrs. Harvey stated that the last Neighborhood Stabilization Program (NSP) home was sold last
month, closing this program with a total of 11 homes sold and settlement assistance provided to 10
first time home buyers.
In response to Councilman Hutchison’s inquiry as to the level of requests for assistance and support,
Mrs. Harvey advised that the number of such requests had increased, and the FY 2014 CDBG budget
was increased to support those needs. She noted that the summer tends to be a busier time for the
program.
Responding to Mr. Dixon regarding activities related to the Restoring Central Dover Initiative, a
planning initiative for the revitalization of central Dover, Mrs. Harvey stated that several related
open houses were held during the previous week at Bayard Plaza and they were well attended
(approximately 150 people). A successful street fair also took place on May 10, 2014. She indicated
that the National Council on Life and Labor Research (NCALL), the lead agency for the Initiative,
was the recipient of a related grant from the Wells Fargo Regional Foundation and that completion
of an implementation plan for this grant would be the next step for those working on the project.
Paj 47
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF MAY 12, 2014 PAGE 3
Recreation Needs Assessment
Mrs. Ann Marie Townshend advised the Committee that staff was approximately six (6) weeks
behind where they hoped to be at this point in terms of accomplishing the Recreation Needs
Assessment. She stated that it was planned to issue a survey to recreation providers in the area for
review and then to distribute the survey to the community within the next two (2) weeks.
In response to Mr. Hutchison regarding the status of demolition of the recreation building at the
Dover Park, Mrs. Townshend advised members that demolition bids were due on May 14, 2014.
Once Council approves a bidder, staff will move forward with the project. She indicated that an
$80,000 placeholder was included in the FY 15 Capital Improvement Plan budget for future use at
Dover Park and the planned use of these funds would be determined by the results of the needs
assessment.
Mr. Hutchison moved for adjournment, seconded by Mr. Caldwell and unanimously carried.
Meeting adjourned at 3:18 p.m.
Wallace R. Dixon
Chairman
WRD/MK/js/dd/tm
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Minutes\2014\05-12-2014 PR&CE.wpd
Paj 48
UTILITY COMMITTEE
The Utility Committee Meeting was held on May 12, 2014 at 4:00 p.m. with Chairwoman Williams
presiding. Members present were Mr. Perza (arrived 4:07), Mr. Slavin, Mr. Blakeman, and
Mr. Snaman. Councilmen Dixon, Anderson, and Hutchison were also present.
AGENDA ADDITIONS/DELETIONS
Mr. Blakeman moved for approval of the agenda as presented, seconded by Mr. Snaman and
unanimously carried.
Capital School District Request to Transfer Equivalent Dwelling Unit (EDU) Credits
(Dover High School)
Mr. Scott Koenig, City Manager, reviewed a request from the Capital School District to transfer
water and sewer Equivalent Dwelling Units (EDU) from the current Dover High School property
located at 1 Pat Lynn Drive to the new school at 1 Dover High Drive. Mr. Koenig explained that,
based on calculations made by Mrs. Sharon Duca, Director of Public Works, if the request were
approved, the impact fee for the new school would be $18,207, which would include transferred
EDUs from the old property in addition to new EDUs created on the new property. If the request
were not approved, the impact fee would be $412,692. Mr. Koenig pointed out that although this
request is allowable under the City Code, it is only allowed if approved by Council. Members were
advised that, per the City of Dover Code of Ordinances, two (2) references are applicable to this
request. The first code reference is located in Chapter 110, Article III – Water Service, Division 3
– Water Impact Fees, Section 110-208 (d), and the second code reference is located in Chapter 110,
Article IV – Wastewater Service, Division 3 – Wastewater Impact Fees, Section 110-283 (c). Both
sections state that “No EDUs shall be transferred from one property to another property, whether or
not such properties are owned by the same person, without the approval of city council.”
In response to Mrs. Williams’ concern regarding the demolition of the gym, cafeteria, etc. at the
current facility, Mr. Koenig advised that members of the Capital School District were present to
address those questions.
Mr. Sean Sokolowski, Business Manager for Capital School District, advised members that as of
May 12, 2014, it was the District’s intent to demolish all of the existing facilities at the current
location. Responding to Mrs. Williams, Mr. Sokolowski stated that the fields would remain intact
and that keeping the gym, cafeteria, etc. were considered; however, the cost to maintain the
structures would be prohibitive. He explained that demolishing the entire facility would allow the
contractor to perform a complete demolition. If the contractor were asked to preserve certain
sections of the facility, this would change the way the demolition was performed, requiring a great
deal more work and increased costs to preserve the heating, air conditioning and ventilation
(HVAC), electric, etc.
In response to Mr. Slavin, Mr. Sokolowski confirmed that there is a governance from the Department
of Education that the building has to be demolished if funds are accepted for the new facility.
Responding to Mrs. Williams, Mr. Sokolowski said that it was not common practice for the
Department of Education to require demolition of the existing structure when building a new facility;
however, he stated that the Cape Henlopen School District demolished their facility when they built
their new high school and the Laurel School District was looking at doing the same. Mr. Sokolowski
stated that if the Capital School District wished to maintain the current high school, the Department
Paj 49
UTILITY COMMITTEE MEETING OF MAY 12, 2014 PAGE 2
of Education would not have provided funds to build the new school and would have had to invest
in renovating the current building, which would not have been cost effective. In response to
Mrs. Williams concerning other school districts being permitted to keep their existing buildings,
Mr. Sokolowski said that this is sometimes allowed but would only be possible if there was enough
enrollment to fill the old building and the new building, and the Capital School District did not have
this capacity.
In response to Mr. Blakeman, Mr. Sokolowski stated that Capital School District will maintain
ownership of the land where the old school is located; however, there were no immediate plans other
than to hold on to it for future use, hopefully for another middle school or an elementary school.
Mr. Sokolowski noted that when land was being sought for the new high school, there were not
many areas within City limits with enough acreage to accommodate the school, grounds for fields,
parking lots, etc.; therefore, it did not make sense to let go of the property.
Responding to Mrs. Williams, Mr. Sokolowski stated that the old school property would be
accessible to the public, noting that the District continues to keep them in good working order and
has rented them out on occasion.
In response to Mr. Slavin regarding the City Manager’s recommendation on transferring the EDUs,
Mr. Koenig advised members that staff’s position was that the request met the technical merits and
the decision was up to City Council.
Responding to Mr. Dixon regarding the possibility of retaining the gym and other parts of the facility
for youth, Mr. Sokolowski indicated that the gyms at William Henry Middle School and Central
Middle School are available; however, funding is not available to do a partial demolition at Dover
High School.
Responding to Mr. Perza regarding the City having a basis or a precedent to deny a request for
transfer of EDUs, Mr. Koenig stated that such a transfer was approved for Capital School District
for their administrative offices; therefore, there was a precedent for approving this type of request,
but not for denying it, to his knowledge. In response to Mr. Koenig as to whether he recommended
the transfer, Mr. Koenig stated that the Public Works Department indicated that the request met the
technical merits and the City Manager’s Office recommended approval of the transfer based on those
merits.
In response to Mrs. Williams as to whether the gym at the current high school could be left for use
as a stand-alone building, Mr. Koenig stated that this was possible; however, the costs associated
with doing so would be drastically greater and he did not have authorization to make that
recommendation. Additionally, aside from the responsibility and cost associated with maintaining
the facility, any agreement that would be established if the gym were to remain would likely include
a clause that if the Department of Education wanted to use the property for a school, the City would
have to abandon the facility. As a result, it could cost the City millions of dollars to invest in the
partial demolition and subsequent maintenance, only to have to abandon the property later. In
addition, the certificate that was granted to the Capital School District from the Department of
Education specifically stated that the current facility would be demolished.
Paj 50
UTILITY COMMITTEE MEETING OF MAY 12, 2014 PAGE 3
Responding to Mrs. Williams regarding other issues related to construction of the new high school,
Mr. Koenig stated that, at this time, he did not have any additional concerns. He indicated that the
Capital School District had committed to building a second entrance, the apartment developer had
reinitiated their projects so that the road would be extended and tied into the subdivision, and the
additional sidewalks on the north side of Route 8 were progressing. He noted that there was one (1)
property that may have to go to condemnation; however, all other property owners had agreed to the
easements.
Responding to Mr. Perza as to whether the City should postpone the transfer until after the school
is opened to ensure that all outstanding items are completed, Mr. Koenig indicated that impact fees
are traditionally paid at the time of occupancy; however, City Council had the option to suspend
action on the transfer until all items are complete.
In response to Mr. Blakeman, Mr. Perza advised that if the Capital School District wanted to use the
old high school property at a later date, they would have to pay the full impact fees.
Mr. Slavin moved to recommend approval of the transfer of Equivalent Dwelling Unit (EDU)
credits for the Capital School District from 1 Pat Lynn Drive to 1 Dover High Drive. The
motion was seconded by Mr. Dixon and carried by a vote of four (4) yes (Williams, Slavin,
Blakeman, and Slavin) and one (1) no (Perza).
Annual Review and Approval of Governing Policy For Energy Commodity Risk Management
Mr. Scott Koenig, City Manager, reviewed the Governing Policy for Energy Commodity Risk
Management (Attachment #1) and explained that this policy governs how the City trades energy.
He stated that the hedge program outlines the rules for good transactions that can be reviewed by the
internal committee and lets the public know that the City is following the rules. Mr. Koenig advised
members that the changes referenced in the document were basically “housekeeping” changes.
Mr. Blakeman moved to recommend approval of the Governing Policy for Energy Commodity
Risk Management, seconded by Mr. Slavin and unanimously carried.
Quarterly Review of Utility Related Capital Investment Plan (CIP) (Electric and
Water/Wastewater)
Mr. Scott Koenig, City Manager, reviewed the Capital Investment Plan Project Tracking Report, as
of March 31, 2014 which included the financial status of each project, noting some of the projects
were complete and some had not been billed yet.
Mr. Koenig provided updates on the Garrison Farm project, stating that the water, sewer, and electric
projects had been authorized by Council and were underway, as well as the earth moving component
of the storm water aspect. Mr. Koenig advised members that George & Lynch, Inc., the contractor
for the sewer project, had mobilized and it was expected that the tower contractor would mobilize
shortly.
Mr. Koenig advised members that Community Transportation Fund projects had been reallocated
to South Street adjacent to the hospital, however, it continued to appear open on the report because
the contractor had not presented the bill to the City yet.
Paj 51
UTILITY COMMITTEE MEETING OF MAY 12, 2014 PAGE 4
Mr. Koenig indicated that members were starting to catch up on some of the backlog of capital
projects, noting that the Horsepond project had made substantial progress and that Council would
be considering the extension for services for the Van Sant proposal during their meeting scheduled
for later in the evening.
Responding to Mr. Anderson, Mr. Koenig advised members that the cost of the Garrison Oak
Technical Park improvements was approximately $14.2M, including the water tower, the sanitary
pumping station and force main, improvements including the road, storm sewers, the water main,
gravity sewer main, and design drawings for the entire subdivision. Of that amount, approximately
$550,000 was for electric improvements. In response to Mr. Anderson regarding the amount of
funds that were provided by City taxpayers and how much was bond money, State contributions, and
Calpine contributions, Mr. Koenig stated that he did not have the breakdown with him but offered
to provide this information. The State of Delaware did not contribute to the portion of the project
that he had described; however, State funds went to the gas line extension. He indicated that there
was no cash contribution from Calpine; the $14.2M was City funds from General Fund Bonding, the
Water/Sewer Fund, and the Electric Fund.
In response to Mr. Slavin, Mr. Koenig advised that the City did not contribute to the gas line and that
the total cost was roughly $7M, $2M of which was paid by the state.
Responding to Mr. Anderson, Mr. Koenig advised that the in-ground pipe and elevated storage inside
the Garrison Oak Technical Park were designed for the full build-out of the Park; however, if
additional wattage is required, it will be necessary to develop additional water resources.
Mrs. Williams stated that the Purchase Power Agreement (PPA) and water revenues would be
primary resources to recapture costs.
Responding to Mr. Perza, Mr. Koenig stated that it was his plan to resume the Tar Ditch Interceptor
project within the next 60 days and he hoped to meet with the property owners to attempt to acquire
some of the easements.
TEA/NAES Report (March)
The TEA/NAES Monthly Report for March 2014 was provided to members to enable them to
monitor electric sales and revenues received, which will provide a better understanding of any
fluctuations that occur and allow the opportunity to make improvements if deemed necessary.
Mr. Blakeman moved to recommend acceptance of the report, seconded by Mr. Perza and
unanimously carried.
Updates
Green Energy Funding and Programming
Members reviewed details regarding Green Energy Funding and Programming.
National Pollution Discharge Elimination System (NPDES)
Mr. Scott Koenig, City Manager, advised members that the City received three (3) notices of
violation of the Municipal Separate Storm Sewer System (MS4) permit. One violation was for non-
compliance and two (2) violations were related to properties owned by the City: the former Public
Works site and the City of Dover warehouse site. Staff was currently working through these notices
Paj 52
UTILITY COMMITTEE MEETING OF MAY 12, 2014 PAGE 5
of violations and would be making the associated corrections to become compliant. Mr. Koenig
advised members that the presentation provided at the Budget Hearings scheduled for the next week
would include a request for an Environmental Scientist position to address these issues and remain
compliant.
Responding to Mr. Hutchison, Mr. Koenig advised that the violations had not cost the City money
to date; however, if the City does not become and remain in compliance, financial penalties could
be assessed.
Garrison Oak Technical Park Project Updates
Mr. Scott Koenig, City Manager, provided the following updates:
City Infrastructure
Mr. Koenig advised members that A-Del Construction Company, the City’s earth work and road
contractor, had begun digging the ponds associated with storm water management. George & Lynch,
Inc. was putting in a 16-inch force main on White Oak Road that will extend back from the Garrison
Farm under Route 1 to the White Oak Farm pump station. He indicated that as soon as there is a
passable drive back to the elevated storage tower site, the earth work associated with the sanitary
pump station should begin. Mr. Koenig indicated that the work could begin during the current week.
He noted that engineers had been reviewing all of the field drawings to proceed with that portion of
the project.
Calpine Energy Center
Mr. Scott Koenig, City Manager, stated that the Calpine Energy Center was heavily under
construction. He advised that weekly teleconferences were continuing regarding the right-of-way
clearing back to the 230kV tie and work was progressing with Delmarva Power on building the radio
line from the 230kV tie back to the Garrison Energy Center. Mr. Koenig also stated that the gas
main work was underway and, as of May 12, 2014, was approximately 52% complete. It was hoped
that the area around Dover Downs would be cleaned up in advance of the Firefly Festival so that gas
line construction would not be taking place in that area during the festival. He noted that the Uzin
Utz project was nearing final approval, noting that a ground breaking was scheduled on Tuesday,
May 13, 2014 and construction would begin shortly at Calpine. In addition, Mr. Koenig advised that
Chesapeake Gas was scheduled to install the gas distribution line through the Garrison Farm
infrastructure once the roads are generally laid out. Mr. Koenig stated that the construction was
scheduled for substantial completion by the end of 2014 and that projects seemed to be progressing
as scheduled in order to receive flows for Calpine and Uzin Utz.
Dover Sun Park
Members reviewed details regarding the Dover Sun Park.
Mr. Snaman moved for adjournment, seconded by Mr. Slavin and unanimously carried.
Meeting adjourned at 4:36 p.m.
Beverly C. Williams
Chair
BCW/MK/js/dd/tm
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Minutes\2014\05-12-2014 UTILITY.wpd
Attachments
Attachment #1 - Governing Policy for Energy Commodity Risk Management
Paj 53
ATTACHMENT #1
Utility Committee Meeting of 05-12-2014
City of Dover, Delaware
Governing Policy
For
Energy Commodity
Risk Management
Effective: September 10, 2012
Approved by: City of Dover Council
Date: September 10, 2012
Paj 54
TABLE OF CONTENTS
PURPOSE OF THE RISK MANAGEMENT POLICY ................................................................34
A. Introduction...................................................................................................................34
B. Scope of Policy ..............................................................................................................34
C. Objectives and Risk Philosophy .................................................................................45
D. Policy Administration ..................................................................................................45
MANAGEMENT AND CONTROLS ...........................................................................................56
A. Utility Committee of The City Council .....................................................................56
B. Executive Risk Management Committee ..................................................................56
1. City Manager .............................................................................................................................. 7
2. Director of the Utility............................................................................................................... 78
3. Controller .................................................................................................................................. 78
4. TEA Member Services Manager............................................................................................. 89
DISCUSSION OF RISKS .............................................................................................................89
MARKETING AND TRADING PRACTICES ..........................................................................910
A. Standards of Conduct ................................................................................................910
B. Products, Activities and Limitations .......................................................................910
C. Contract Documentation and Confirmations.......................................................1011
D. Training..........................................................................................................................11
E. New Product Protocol .............................................................................................1112
RISK LIMITS AND RISK MEASUREMENTS.......................................................................1112
A. Limits..........................................................................................................................1112
1. Volume/Maturity/Value Limits ....................................................................................... 1112
2. Volume Limits ...................................................................................................................... 1213
3. Locational Limits .................................................................................................................. 1213
B. Stress Testing and Back Testing .............................................................................1213
C. Instances of Exceeding Risk Limits........................................................................1213
CREDIT POLICY ......................................................................................................................1213
A. Measuring Credit Risk .............................................................................................1314
B. Analysis and Extension of Credit Limits ..............................................................1314
C. Instances of Exceeding Credit Limits ........................................................................14
REPORTING .............................................................................................................................1415
A. Risk Reporting ..........................................................................................................1415
B. Credit Reporting .......................................................................................................1516
C. Hedge Effectiveness Reporting ..............................................................................1617
INFORMATION TECHNOLOGY SYSTEMS ........................................................................1617
POLICY DISTRIBUTION AND COUNSEL ...........................................................................1617
A. Distribution Outside The City ................................................................................1617
B. Designated Counsel .................................................................................................1617
APPENDIX A – Approved Products .........................................................................................1718
APPENDIX B – Approved Counterparties and Threshold Tables ............................................1819
APPENDIX C – Business Risks ................................................................................................2223
APPENDIX D – Glossary ..........................................................................................................2324
APPENDIX D – Swap Transaction Representative ..................................................................2526
2
Paj 55
PURPOSE OF THE RISK MANAGEMENT POLICY
A. Introduction
The City of Dover (“City”) and its customers are routinely exposed to energy price risk,
volume variability risk, basis risk and credit risk – herein referred to collectively as
energy commodity risk - in the normal conduct of serving its electric load requirements.
Volatility of energy commodity prices and volumetric uncertainty (either
supply/generation or load obligations) impose a substantial and direct risk to the City’s
financial and operating performance.
By authority of its charter, the City has responsibility for overseeing the City’s
electricity operations, including the management of its cost of serving Dover’s
customers. By agreement dated May 6, 2011 and approved by the City (the “EMA”),
the City has engaged The Energy Authority, Inc. (“TEA”) to assist the City with Asset
Management and Strategic Planning Services, Risk Management Services, and Energy
Management Services.
This Policy for Energy Commodity Risk Management (“Policy”) is established the
explicit understanding that the City has retained and delegated responsibilities to TEA
to provide Risk Management Services.
Additionally, the City has issued this Policy for dealing with the philosophy,
framework and delegation of responsibilities necessary to govern activities related to
Dover’s energy commodity risk management. As set forth herein, the City has
established an organizational structure, delegated responsibility and established
internal controls and procedures to ensure that all transactional and oversight activities
are conducted in compliance with this Policy and in accordance with the City’s normal
reporting, legal, financing and regulatory requirements relating to energy assets and
transactions.
B. Scope of Policy
This Policy covers all transactions entered into the by the City of Dover designed to
meet the City’s electric load requirement and the management of risk related to these
transactions.
In the event of conflict between this Policy and the EMA, the Policy shall control.
This Policy is separate and distinct from enterprise risk management policies and
procedures addressing the City’s safe operation of its generating stations and energy
3
Paj 56
infrastructure, insurance requirements, permit compliance, employee matters
regulatory compliance with laws and regulations of the State of Delaware and Federal
Agencies such as EPA, FERC, NERC and CFTC or other potential risks to the City
beyond the purchase and sale of fuel and electric power and its ancillary products.
C. Objectives and Risk Philosophy
The objectives of the Policy are to identify energy commodity price and credit risk
exposures and give the City a framework for the quantification and management of
these exposures. The Policy will identify the reports needed to convey how the
identified risk exposures can potentially impact the City’s overall cost of providing
electricity service to its customers and report on the risk management of the
transactions associated with City’s electric load requirements.
Under the Policy, risk management activities will be conducted consistent with the
City’s overall objective of appropriate risk mitigation. There are several objectives of
the Policy which, when taken and executed together, serve to manage the City’s energy
commodity price exposures. Specifically, the Policy:
Establishes framework for developing credit limits for counterparties and quantifies
and manages the credit exposures related to potential counterparty abrogation
Quantifies the impact of the above exposures on City’s financial results
Manages the impact of the above exposures in line with the City’s identified level of
risk tolerance
Provides clear delineation of responsibilities and authority, outline a separation of
duties, and ensure reporting of risk is timely and accurate.
Ensures that the impact of any action affecting the City’s position is consistently
quantified, monitored and authorized.
The City’s risk management activities will be conducted consistent with its overall objective of
appropriate risk mitigation and never for purposes of speculation.
D. Policy Administration
This Policy has been approved by the Executive Risk Management Committee and The
Utility Committee of the Dover City Council. The Utility Committee must approve
modifications to the Policy with the exception of the appendix information which can
be modified with the approval of the Executive Risk Management Committee.
4
Paj 57
MANAGEMENT AND CONTROLS
This Policy articulates the management and organization of the City and TEA to serve
as a control framework outlining delegation of duties and responsibilities.
A. Utility Committee of The City Council
The Utility Committee of The City Council (The Committee) has a responsibility to
provide approval of this Policy. With this approval, The Committee also assumes
additional duties. They will understand the risks the City is and could be exposed to
due to their energy commodity risk management activities. In this role, the Committee
will have a responsibility to also understand the City’s policies and procedures, internal
controls and systems which are used to help manage the City’s energy commodity
risks.
The Committee will approve any amendments to the Policy or limits within. The
Executive Risk Management Committee will update the Committee periodically
regarding the Policy and its functions. It will be the Committee’s responsibility to:
Discuss guidelines and strategic policies that govern the process by which the
Energy Risk Management Committee assesses and manages risks
Review and approve the risk policy at least annually
Approve new members of the Executive Risk Management Committee
Acknowledge the risk inherent in transactions covered under this Policy
B. Executive Risk Management Committee
An Executive Risk Management Committee (“ERMC”) has been formed to provide
executive management oversight for the City’s energy commodity risk management
activities. The ERMC is charged with the creation, amendment and administration of
this Policy, including acquiring any approvals required by the Utility Committee, and
will ensure that all energy commodity risk management activities of the City are
performed consistent with this Policy. The ERMC will meet at least monthly to review
compliance and conduct its business as described in this Policy.
The ERMC shall be comprised of the following voting members: The City Manager,
The Director of Utility, The City’s Controller and TEA’s Member Client Service
Manager.
The City’s ERMC will make decisions following the process outlined in this Policy.
TEA’s Member Client Services Manager may include representatives from other areas
within TEA in the monthly ERMC meetings who will attend in person or by conference
call as non-voting advisors. Other City employees and TEA staff may also be asked to
5
Paj 58
attend meetings from time-to-time, as the ERMC deems necessary. The responsibilities
of the ERMC shall include:
Establish scope and frequency for management reporting to the Utility Committee.
No less than annually, review the City’s Energy Commodity Policies and Procedures
for correctness and completeness.
Review and approve any new risk report or change to an existing risk report
provided by TEA to monitor risks outlined in this Policy.
Understand and approve any models, methodologies, and assumptions used for
measuring risks such as volume risk, process risk, counterparty risk and commodity
risk.
Monitor the City’s risks and ensure they are within the limits and are being
managed according to what is indicated within the City’s Policy and associated
procedures
Understand the City’s risk management objectives and risk tolerances.
Review and approve the risk management and trading strategy programs and
associated risk. Each program should be reviewed to ensure alignment with Policy
objectives and compliance with risk limits within this Policy.
Periodically review any risk management program approved in light of recent
market changes, and ensure continued compliance with its established guidelines
Review and approve new products, markets, trading counterparties and credit
limits
Review all violations and exceptions to this Policy and report such to the
Committee.
Approve the individuals or companies that engage in the City’s commodity
transactions and are subject to the limits within this Policy.
Ensure that the individuals or companies authorized to transact on behalf of the City
as well as manage its risks, are appropriately trained and qualified.
Ensure independence and segregation of duties between front, middle and back
office at TEA.
Recommend changes to this Policy to the City’s Utility Committee for approval and
ensure the Utility Committee understands the City’s overall compliance with this Policy
and associated procedures
The ERMC will meet at least monthly to review risks identified and reported on by the
Policy, this meeting shall be chaired by The City Manager. Minutes of each meeting of
the ERMC shall be recorded and reflect any decisions and follow-up action items to be
performed. These minutes will be reviewed and approved by the members of the
ERMC in a timely manner.
Each member of the ERMC has a unique role as defined below:
6
Paj 59
1. City Manager
The City Manager is independent of all commercial functions and carries the
responsibility of establishment and maintenance of risk management for the City. The
City Manager will be a voting member of the ERMC and act as a chair of the ERMC.
Other responsibilities include:
Ensure this Policy is maintained.
Oversee reviews of the City’s energy commodity risks, limits, risk measurement
methodologies and models, and programs and recommend changes to the ERMC.
Ensure potential transactions and their impacts on the City’s risks and limits defined
within this Policy.
Develop and monitor the implementation of the Policy, and oversee other risk
management processes and procedures established by this Policy or otherwise by
the ERMC.
2. Director of the Utility
The Director of the Utility is responsible for all trading, hedging, pricing, structuring,
and market and operational risk management activities associated with the City. The
Director of the Utility will be a voting member of the ERMC. Other responsibilities
include:
Review the effectiveness of transaction processing systems and procedures relating
to risk measurement.
Recommend operational risk and business risk assessment guidelines.
3. Controller
The Controller is independent of all commercial functions and carries the responsibility
of the City’s accounting practices. The Controller will be a voting member on the
ERMC. Other responsibilities include:
Perform financial accounting including accounting for hedging and derivatives
activities.
Comply with tax rules and make appropriate tax elections.
Record realized and unrealized gains and losses.
Reconcile general ledger, cash transactions and margin accounts.
Implement tax-hedge accounting policies and other regulatory tax requirements.
Develop and maintain documentation outlining standard procedures for conducting
business.
Invoice counterparties and resolve billing disputes.
Perform daily/weekly/monthly transaction checkout with counterparties.
7
Paj 60
Develop and maintain documentation outlining standard procedures for conducting
business.
4. TEA Member Client Services Manager
The TEA Member Client Service Manager roles and responsibilities are defined exhibit
B of the EMA between the City and TEA. The TEA Client Member Service Manager
will be a voting member on the ERMC. Other responsibilities include:
Monitor risk reports between ERMC meetings.
Report to the Committee and the ERMC on the City’s adherence to all limits and
functions within this policy.
Engage the ERMC in discussions regarding events or developments that could
expose the company to potential losses.
Recommend to the ERMC specific risk limits consistent with the City’s risk
management objectives, risk tolerance, and risk management policy.
Coordinate and distribute independent market fundamental analysis.
Provide advisory support and recommendations as specified in Article 5 of the
EMA.
DISCUSSION OF RISKS
This Policy covers the management of all material energy market risks faced by the City. A
comprehensive list of risks that are or could be relevant to City is shown in Appendix C of the
Policy. Among the most critical of these risks are commodity risk, counterparty risk, process
risk, volume risk, and budget risk. These risks are measured by the limit structure and controls
outlined in the Policy.
Commodity risk represents the potential adverse impacts to the value of the City’s
portfolio due to changes in the market. Commodity risk encompasses volatility risk,
forward price risk, basis risk, correlation risk and liquidity risk.
Counterparty risk represents the potential losses the City could incur due to delivery
risk and receivable risk. Delivery risk stems from a supplier or trading counterparty
that is unable or unwilling to perform on its commitments including but not limited to
delivery or receipt of commodities. Receivable Risk includes the City’s risk associated
with a counterparty’s timeliness of payment for services rendered.
Process risks represents the risks associated with process problems including, but not
limited to, inaccurate data capture, untimely trade execution or settlement problems.
Controls over process risks are embedded in the organizational structure of TEA
through the design processes and operating procedures.
8
Paj 61
Volume Risk represents the potential for unforeseen changes from projections of excess
or shortfall of capacity or energy from the actual needs. When variances are large
coupled with large costs to transact and adverse moves in market prices this risk could
be realized. In management of this risk, the City must be aware of the fact that
unexpected variations in volume are often highly correlated with price movements.
Budget Risk represents the potential to deviate outside of tolerable bounds of the City’s
budget. Deviations from budget can be caused by forecast error or unforeseeable
adverse changes in market prices.
MARKETING AND TRADING PRACTICES
A. Standards of Conduct
Individuals authorized to transact for the City shall not misrepresent, conceal or
withhold information regarding energy commodity trading and risk management
transactions to any person responsible for the accurate recording and/or reporting of
such transactions; participate in any such transaction or similar activity for the benefit
of any party other than the City; or hold or be a beneficiary of any financial interest in
any entity with which the employee is engaged in trading or other business activity
(other than ownership of an interest in a mutual fund managed by another party).
Further, no employee authorized to place or execute such transactions may engage in
trading power or energy commodities derivative instruments for his or her personal
account.
B. Products, Activities and Limitations
Pursuant to achieving the City’s core objectives for the purpose of energy commodity
risk management, the following limitations shall apply.
Permissible instruments will be restricted to the products and instruments specified
in Appendix A – Approved Products of the Policy;
o All physical forward transactions shall be governed by the Edison Electrical
Institutive (EEI), North American Energy Standards Board (NAESB), or
similar agreements with counterparties approved by the City.
o The City reserves the right to enter into financial hedge transactions to
effectuate Policy objectives, but does not authorize TEA to enter into financial
hedge transactions on its behalf. Any such financial transactions that the City
may enter into shall be governed by ISDA agreements with counterparties as
approved by the City.
The maturity for each permissible instrument will be restricted to the maturity limits
specified in the risk limits section of the Policy.
9
Paj 62
Transaction volumes for each risk management transaction will be restricted to the
amounts specified in the Risk Limits section of the Policy.
Risk management transactions will be outlined in the City of Dover Hedge Program
which will be approved by the ERMC. Risk management transactions may include
the following:
o Hedging the forward price of purchased power for delivery to the City as
needed to meet its electric load requirements.
o Hedging the forward price of natural gas and fuels as needed to generate
power to meet the City’s electric load requirements.
o Unwinding of hedges to accommodate changes in expected load
requirements, or for economic reasons subject to explicit constraints set by the
ERMC.
C. Contract Documentation and Confirmations
No over-the-counter transaction may be executed until an EEI, NAESB, or similar
agreement has been authorized by the City, approved by the ERMC and fully executed
by the parties.
Written confirmations will be required from counterparties, as defined in the Master
Service Agreement between the City and counterparty, within one business day or such
longer time as required by the contract in question for all risk management transactions.
Contemporaneous with any commitments and prior to receipt of written confirmations,
verbal commitments shall be memorialized internally as to instrument structure,
quantity, relevant time horizon, price and any other relevant terms; such internal
documentation shall be time stamped and correlated to the ultimate written
confirmation to or from the counterparty. Both the internal documentation as well as
the written confirmation from the counterparty shall be provided to TEA’s Risk Control
Group immediately upon receipt for verification.
In the event that there is a material failure to provide timely documentation or
confirmations, then at the City Manager’s sole discretion, the offending individual’s
authorization may be suspended. Similarly, if the failure to provide timely
documentation or confirmations is due to the failure of counterparty, then at the
discretion of the City Manager, a moratorium may be imposed on transactions with that
counterparty. In such cases, the City Manager shall notify the ERMC of the issues
leading to the suspension or moratorium shall.
Nothing herein shall inhibit the City Manager from bringing control issues to the TEA’s
Member Client Services Manager prior to a decision on materiality or the imposition of
a suspension of trading privileges or counterparty moratorium.
10
Paj 63
D. Training
The ERMC will ensure that all City employees and/or TEA Staff that will execute
transactions on behalf of the City will have appropriate training in the markets in which
the transactions occur.
E. New Product Protocol
As required to manage the City’s energy commodity risk the ERMC shall approve new
products provided the requirements of the New Product Approval Procedure are met.
RISK LIMITS AND RISK MEASUREMENTS
A. Limits
The limit structure is designed to quantify the types of risk in City’s energy commodity
portfolio. The City will manage and report on its energy commodity market risk using
Volume/Maturity/Value Limits, a Cost of Service Limit and a Hedge Loss Limit.
1. Volume/Maturity/Value Limits
Transaction limits for the Individuals Authorized to execute transactions and the
maturity limits for each permissible instrument are listed below. Transactions for
amounts in excess of those listed may be executed only upon approval of the ERMC.
This limit, maturity and value structure is not intended for use when transacting day-
ahead and real time in the PJM market.
Maximum Daily Notional Limits
Volume/Maturity/Value Limits
Volume Value ($000)
Balance of the Month through 12 Months 50 20,000
Power Between 13 Months and 24 Months 50 20,000
(MW) Between 25 Months and 36 Months 25 10,000
Hourly Limit Between 37 Months and 48 Months 25 10,000
Between 49 Months and 60 Months 25 10,000
Balance of the Month through 12 Months 30,000 400
Natural Gas Between 13 Months and 24 Months 30,000 400
(MMBtu) Between 25 Months and 36 Months 10,000 200
Monthly Limit Between 37 Months and 48 Months 10,000 200
Between 49 Months and 60 Months 10,000 200
Balance of the Month through 12 Months 6,000 400
#2/#6 Fuel Oil Between 13 Months and 24 Months 6,000 400
(Bbl) Between 25 Months and 36 Months 3,000 200
Monthly Limit Between 37 Months and 48 Months 3,000 200
Between 49 Months and 60 Months 3,000 200
11
Paj 64
The amounts in the table above refer to the maximum volume of orders that can be
placed in any one day the individuals authorized to conduct trades for the specified
time period. On any one day the maximum transaction volume placed can be for up to
50 MegaWatts per hour for every hour during a single calendar month (including both
on-peak and off-peak hours), OR 25,000 MMBtu per month for all months pertinent to
the natural gas transaction, OR 6,000 Bbl per month for all months pertinent to the oil
transaction.
2. Volume Limits
For no reason should a transaction be executed that exceeds the City’s electric load
requirements. If there is an adjustment to the City’s electric load requirements and the
existing transactions greater than 100% of the adjusted electric load requirements the
ERMC will review and approve the offsetting strategy deployed in sufficient proportion
to mitigate the encroachment.
3. Locational Limits
Non-Commodity Transactions must support the requirement of one of the City’s
generation units, native load or transaction locations.
B. Stress Testing and Back Testing
The City’s positions shall be periodically stress tested and models shall be back tested.
The processes around these tests are outlined in the Stress Testing and Back Testing
Procedure.
C. Instances of Exceeding Risk Limits
Should the City or TEA enter into a transaction that causes the portfolio to exceed any
above mentioned limits the Director of the Utility shall, in addition to notifying the
ERMC, also notify the Chair of The Committee as soon as practicable and shall provide
periodic reports to the Chair on the status the transactions for as long as the City is
exceeding its limits. The ERMC will review and determine whether any liquidation or
offsetting of transactions is warranted. The incident will be documented as a Policy
Exception by the Director of the Utility.
CREDIT POLICY
Credit Risk is the risk due to the uncertainty in a counterparty’s ability to meet its
contractual obligations. The primary objective of this credit policy is to mitigate, to the
extent commercially reasonable, the credit risks associated with transactions covered in
this Policy while still allowing the City to achieve its objectives.
12
Paj 65
A. Measuring Credit Risk
The status of credit risk will be measured and reported through reports provided by
TEA.
The current credit exposure will be reported at the agreement level via a Counterparty
Credit Report provided by TEA. This information will be made available in real time to
TEA trading personnel so that it can be checked prior to executing transactions for the
City. Those responsible for risk oversight at the City and TEA will have access to this
information no less frequently than once per day. The ERMC will monitor overall
credit utilization and any credit exceptions at least monthly. When measuring the
current credit risk, netting will be applied to the exposure if the City’s contract with a
counterparty includes provisions for netting.
B. Analysis and Extension of Credit Limits
Physical and financial commodity transactions will be executed with counterparties
approved by the ERMC with credit available to support the transactions. The
creditworthiness of a counterparty will be determined by both qualitative and
quantitative factors. Factors shall include, but not limited to:
A company’s debt credit ratings provided by the rating agencies.
Financial data such as an analysis of the income statement, balance sheet, and cash
flow, as well as liquidity and capital structure.
Subjective factors such as company’s fuel diversity, overall size, risk management
policy and internal controls, geographic diversity, and market intelligence.
A credit limit is the amount of unsecured credit granted to a counterparty. Unsecured
credit exposure includes amounts owed by the counterparty, whether billed or not, and
the mark-to-market differences in value of any collateral which the counterparty has
provided the City. Any net exposure above the collateral threshold will require the
posting of collateral by a counterparty. Further information on the City’s procedure for
establishing credit is contained in the Counterparty & Credit Review Process.
Collateral thresholds, term limitations and credit exposure limits will be subject to the
maximums indicated in Appendix B, based upon the lower of the S&P and Moody’s
credit ratings.
At no time will the City incur a credit exposure with any counterparty greater than
$60,000,000.
13
Paj 66
C. Instances of Exceeding Credit Limits
The City and TEA are restricted by the credit limits approved by the ERMC. The ERMC
can suspend trading with a counterparty, if that counterparty’s credit limit has been
reached or exceeded. The City or TEA traders shall not exceed the Counterparty
Credit Limit by executing transactions with any counterparty without approval of the
ERMC.
The ERMC will determine when it’s appropriate to require additional collateral if a
counterparty’s credit exposure exceeds its credit limit. Collateral includes standing
letter of credit, cash, and prepayments.
All credit exceptions will be documented and reported to the ERMC and the Committee
as Policy Exceptions.
REPORTING
A. Risk Reporting
Preparation of timely reports is critical to monitoring risk. TEA will furnish the
required reports on a regular frequency for the City in a format acceptable to the ERMC.
In addition, the ERMC and its designees will be provided access to the City’s risk
reports as updated daily via TEA’s secure Web Portal.
Reports required on a monthly basis and for periodic meetings of the ERMC include the
following:
Profit and Loss Report
The Profit and Loss (P&L) Report shows the daily realization of transactions at either
the transaction price or the market price as transaction roll from unrealized to realized.
This report should show volumes, transaction prices and market prices of realized
physical and financial power and fuel transactions.
Mark to Market Report
The Mark to Market (“MTM”) Report conveys the potential transaction exposure if the
energy commodity portfolio was liquidated at the most recent market settlement prices.
This report should show volumes, transaction prices and market prices of unrealized
physical and financial power and fuel transactions.
14
Paj 67
Activity Report
The Activity Report presents a summary of all energy commodity risk management
activities undertaken, including new transactions taken, existing transactions
settled/liquidated, and any transactions unwound.
Cost of Service Report
The City’s exposure to energy price risk shall be monitored and reported on a Cost-of-
Service basis. All calculations are at the wholesale level. The Cost-of-Service recognizes
all prior (expired) months within the Power Year on the basis of actual (incurred) costs,
and recognizes all forward (pending) months within the Power Year on the basis of
expected forward power and fuel prices and expected forward load-following risks. As
defined below, the Cost-of-Service is an aggregation of Forward Energy Commodity
Portfolio Cost, the Load Following Cost Expectation and the City’s Budget Target for
Purchase Power Expense.
o The Net Purchased Power Cost shows the net cost of all physical and financial
transactions related to the City’s anticipated commodity requirements for power
and fuel and is based on the price of all hedge transactions plus the forward
market price of all unhedged transactions valued at current forward prices for
energy commodities, customer-level cost per MWH of all physical and financial
transactions related to Dover’s actual plus anticipated energy.
o The expected fixed costs defined as load-serving entity (LSE) capacity costs,
transmission costs and TEA management fees.
o The Expected Load-Following Cost for a specified power year is defined as the
expected cost (or revenue) associated with intra-month load variations due to
weather or other events affecting demand. As an interim measure due to lack of
necessary market information and the rapid evolution of the PJM RTO market,
the ERMC has specified $2.50 per MWH as an estimate of the Load Following
Cost to be used for estimating the City’s Forward Cost-of-Service Report. The
ERMC will update the Expected Load Following estimate while lack of necessary
market information persists no less than annually.
o The Budget Target for Purchase Power Expense represents the City’s view of
expected purchase power expense.
B. Credit Reporting
Counterparty Credit Report
The Counterparty Credit Report conveys the exposure to all counterparties with which
the City has credit exposure resulting from its energy commodity risk management
activities.
CFTC Reporting
The City understands that transacting over the counter (OTC) swaps carries an
additional Commodity Futures Trading Commission (CFTC) reporting function. Once
15
Paj 68
required by the CFTC, the City will report on how the City generally meets its financial
obligations associated with entering into non-cleared swaps in a manner acceptable to
the CFTC.
C. Hedge Effectiveness Reporting
If the City’s transactions require a hedge effectiveness test, those testing results will be
reported to the ERMC no later than one month after the end of the financial reporting
period. The report will include a summary of testing methodology, assumptions of the
testing and the outcome of results with a pass or fail by transaction.
INFORMATION TECHNOLOGY SYSTEMS
Since information systems play a vital role in The City’s trading abilities, the City shall
ensure that the information systems and technology used to store all transaction
information is maintained and secure. The City’s transactions will be stored in TEA’s
enterprise trading and risk management system. TEA uses the TriplePoint Commodity
XL (CXL) system, integrated with Commodity XL for Credit Risk (Credit Risk). TEA
has assigned a Database Administrator (DBA) that is charged with the database security
and maintenance for the transaction database, CXL.
The following safeguards for data security and backup will be installed:
Transaction data stored in the system of record will be replicated daily to ensure
data redundancy;
The CXL database will be backed up at least daily after the close of business.
POLICY DISTRIBUTION AND COUNSEL
A. Distribution Outside The City
The City’s Policy is restricted to the use of the City and TEA organizations. It shall not
be distributed outside these organizations without the consent the ERMC.
B. Designated Counsel
Questions about the interpretation of any matters of this Policy should be referred to
ERMC. The ERMC will provide clarification and explanation on any updates to this
Policy.
All legal matters stemming from this Policy will be referred to the City’s Legal Counsel.
16
Paj 69
APPENDIX A – Approved Products
The following shall constitute a list of approved forward hedge products to be utilized
by TEA to manage the City’s energy commodity portfolio:
Forward Physical Power Peak
Forward Physical Power Off-Peak
Forward Physical Power All Hours
Forward Physical Natural Gas Delivered Dover via Eastern Shore Pipeline
Forward Physical Residual Fuel Oil (#6) Delivered Dover
Forward Physical Residual Fuel Oil (#2) Delivered Dover
Capacity
Forward Financial Power Peak
Forward Financial Power Off-Peak
Forward Financial Power All Hours
Financial Call Option
Financial Put Option
PJM Demand Bids and Generation Offers
PJM InSchedules
PJM Transmission Products
o Financial Transmission Rights
o Annual Auction Revenue Rights
PJM Tier 2 Synchronized Reserves
The above instruments can be executed by TEA on behalf of the City of Dover for the
current and next two successive Power Years (July to June).
17
Paj 70
APPENDIX B – Approved Counterparties and Threshold Tables
This Appendix establishes approved counterparties and their Collateral thresholds.
Collateral thresholds, term limitations and credit exposure limits that are subject to the
following maximums based upon the lower of the S&P and Moody’s credit ratings:
Credit Thresholds from Dover Extended to the Counterparty
Constellation Energy
Threshold S&P Moody's
$ 60,000,000 AAA Aaa
$ 50,000,000 AA‐ to AA+ Aa3 to Aa1
$ 50,000,000 A‐ to A+ A3 to A1
$ 40,000,000 BBB+ Baa1
$ 30,000,000 BBB Baa2
$ 20,000,000 BBB‐ Baa3
$ ‐ Below BBB‐ Below Baa3
Integrys
Threshold S&P Moody's
$ 20,000,000 AAA Aaa
$ 20,000,000 AA‐ to AA+ Aa3 to Aa1
$ 15,000,000 A‐ to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ 1,000,000 BBB‐ Baa3
$ ‐ Below BBB‐ Below Baa3
Sempra Energy
Threshold S&P Moody's
$ 20,000,000 A or above A2 or above
$ 20,000,000 A‐ to A+ A3
$ 15,000,000 BBB+ Baa1
$ 10,000,000 BBB Baa2
$ ‐ BBB‐ or lower Baa3 or lower
Conectiv
Threshold S&P Moody's
Unspecified * Above BBB+ Above Baa3
$ ‐ Below BBB‐ Below Baa3
* Conectiv does not have a defined credit threshold, so for planning purposes, a
18
Paj 71
$10,000,000 threshold is imposed as a conservative limit
Macquarie Cook Power
Threshold S&P Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA‐ to AA+ Aa3 to Aa1
$ 15,000,000 A‐ to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ ‐ BBB‐ or below Baa3 or below
FPL Energy
Threshold S&P Moody's
$ 30,000,000 AAA Aaa
$ 25,000,000 AA‐ to AA+ Aa3 to Aa1
$ 20,000,000 A‐ to A+ A3 to A1
$ 15,000,000 BBB+ Baa1
$ 10,000,000 BBB Baa2
$ ‐ BBB‐ or below Baa3 or below
Deutsche Bank
Threshold S&P Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA‐ to AA+ Aa3 to Aa1
$ 15,000,000 A‐ to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ ‐ BBB‐ or below Baa3 or below
Barclays Bank
Threshold S&P Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA‐ to AA+ Aa3 to Aa1
$ 15,000,000 A‐ to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ ‐ BBB‐ or below Baa3 or below
19
Paj 72
Credit Thresholds from the Counterparty Extended to Dover
Constellation Energy
Threshold Fitch Moody's
$ 40,000,000 AA‐ or Above Aa3 or above
$ 30,000,000 A+ A1
$ 20,000,000 A A2
$ 10,000,000 A‐ A3
$ ‐ BBB or below Baa1 or below
Integrys
Threshold Fitch Moody's
$ 20,000,000 AAA Aaa
$ 20,000,000 AA‐ to AA+ Aa3 to Aa1
$ 15,000,000 A‐ to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ 1,000,000 BBB‐ Baa3
$ ‐ Below BBB‐ Below Baa3
Sempra Energy
Threshold Fitch Moody's
$ 27,000,000 A‐ or above A3 or above
$ 5,000,000 BBB+ Baa1
$ 1,000,000 BBB Baa2
$ ‐ BBB‐ or lower Baa3 or lower
Conectiv
Threshold Fitch Moody's
Unspecified * Above BBB+ Above Baa3
$ ‐ Below BBB‐ Below Baa3
*Conectiv does not have a defined credit threshold, so for planning purposes, a
$10,000,000 threshold is imposed as a conservative limit
20
Paj 73
Macquarie Cook Power
Threshold Fitch Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA‐ to AA+ AA3 to Aa1
$ 15,000,000 A‐ to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ ‐ BBB‐ or below Baa3 or below
FPL Energy
Threshold Fitch Moody's
$ 23,000,000 AAA Aaa
$ 18,000,000 AA‐ to AA+ AA3 to Aa1
$ 13,000,000 A‐ to A+ A3 to A1
$ 8,000,000 BBB+ Baa1
$ 3,000,000 BBB Baa2
$ ‐ BBB‐ or below Baa3 or below
Deutsche Bank
Threshold Fitch Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA‐ to AA+ AA3 to Aa1
$ 15,000,000 A‐ to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ ‐ BBB‐ or below Baa3 or below
Barclays Bank
Threshold Fitch Moody's
$ 25,000,000 AAA Aaa
$ 20,000,000 AA‐ to AA+ AA3 to Aa1
$ 15,000,000 A‐ to A+ A3 to A1
$ 10,000,000 BBB+ Baa1
$ 5,000,000 BBB Baa2
$ ‐ BBB‐ or below Baa3 or below
21
Paj 74
APPENDIX C – Business Risks
Business Risks Topology
Commodity Counterpart
Process Risk Volume Risk Budget Risk
Risk y Risk
Receivables Market Load Market
Price Risk
Risk Deadline Risk Uncertainty Uncertainty
Performance Reporting Load
Volume Risk Supply Risk
Risk Risk Uncertainty
M2M/Forward Generation
Forecast Error
Curve Risk Uncertainty
Liquidity Risk
Basis Risk
22
Paj 75
APPENDIX D – Glossary
Back Office – That part of a trading organization which handles transaction accounting,
confirmations, management reporting, and working capital management.
Bilateral Transaction - Any physical or financial transaction between two
counterparties, neither of whom is an Exchange or market entity (e.g. MISO).
Capacity – The real power output rating of a generator or system, typically in
megawatts, measured on an instantaneous basis.
Commodity - A basic good used in commerce that is interchangeable with other
commodities of the same type. Commodities are most often used as inputs in the
production of other goods or services. The quality of a given commodity may differ
slightly, but it is essentially uniform across producers. When they are traded on an
exchange, commodities must also meet specified minimum standards, also known as a
basis grade.
Financial Bilateral Transaction – A Bilateral Transaction that is non-physical and is
defined by a Source Point, Sink Point, and Delivery Point that may be any CP Nodes as
specified by the Midwest ISO.
Financial Forward – An agreement regarding a position in a specified commodity, a
specified price, and a specified future settlement date, that does not result in physical
delivery of the commodity. Rather one party in the agreement makes a payment to the
other party on the basis of the commodity price at the future date.
Front Office – That part of a trading organization which solicits customer business,
services existing customers, executes trades and ensures the physical delivery of
commodities.
Hedging Transaction - A transaction designed to reduce the exposure of a specific
outstanding position or portfolio; “fully hedged” equates to complete elimination of the
targeted risk and “partially hedged” implies a risk reduction of less than 100%.
Mark-to-Market Value – A measure of the current value of unrealized positions;
includes both Open Positions and Closed Positions.
Middle Office – That part of a trading organization that measures and reports on
market risks, develops risk management policies and monitors compliance with those
23
Paj 76
policies, manages contract administration and credit, and keeps management and the
Board informed on risk management issues.
Policy – Dover’s Governing Policy for Energy Commodity Risk, as amended and
approved by The Utility Committee.
Portfolio – A collection of transactions.
Realized Gains/(Losses) – The amount earned (or lost) from a transaction , considered
to be realized once the time for performance has lapsed (e.g. delivery of power in the
case of physical transactions or expiration of an option in the case of financial
transactions).
Term – The total duration of a contract, defined as the number of days between the
beginning flow date and ending flow date, inclusive.
Unrealized Gains/ (Losses) – The amount expected to earn (lose) on a specific
transaction(s); however, the time for performance has not lapsed. The total value of
Unrealized Gains/ (Losses) is the Mark-to-Market value.
24
Paj 77
APPENDIX D – Swap Transaction Representative
Purpose:
To ensure that the City of DoverXXXX, a Special Entity under the Dodd-Frank Financial
Reform Act, selects a qualified representative (“Representative”) to provide advice and
guidance when entering into swap transactions with Swap Dealers or Major Swap
Participants.
Definitions:
Special Entity: As defined in 7 U.S.C. 6s(h)(2)(C) and further interpreted in 17 C.F.R.
23.401(c). XXXXThe City of Dover is a Special Entity as defined by 17 C.F.R. 23.401(c)(2).
Swap Dealer: As defined in 7 U.S.C. 1a(49) and further interpreted in 17 C.F.R. 1.3(ggg)
Major Swap Participant: As defined in 7 U.S.C. 1a(33) and further interpreted in 17
C.F.R. 1.3(hhh)
Representative: As defined in this policy and 17 C.F.R. 23.450
Policy:
Selection: XXXXThe City of Dover shall endeavor to seek and employ an individual or
entity that will voluntarily act as a Representative for all energy commodity swap
transactions between XXXX and any Swap Dealer or Major Swap Participant. The
Representative must meet the following qualifications identified in 17 C.F.R. 23.450(b):
(i) Has sufficient knowledge to evaluate the transaction and risks;
(ii) Is not subject to a statutory disqualification;
(iii) Is independent of the swap dealer or major swap participant;
(iv) Undertakes a duty to act in the best interests of the Special Entity it represents;
(v) Makes appropriate and timely disclosures to the Special Entity;
(vi) Evaluates, consistent with any guidelines provided by the Special Entity, fair
pricing and the appropriateness of the swap; and
(vii) In the case of a Special Entity as defined in § 23.401(c)(2) or (4), is subject to
restrictions on certain political contributions imposed by the Commission, the
Securities and Exchange Commission, or a self-regulatory organization subject to
the jurisdiction of the Commission or the Securities and Exchange Commission;
provided however, that this paragraph (b)(1)(vii) of this section shall not apply if
the representative is an employee of the Special Entity.
The Representative and XXXXthe City of Dover shall enter into a legal agreement that
binds the Representative to comply with items (i) through (vii) in this policy.
25
Paj 78
At no longer than any 12 month interval, the City of Dover XXXX shall review the
performance of the Representative to ensure compliance with items (i) through (vii) in
this policy.
26
Paj 79
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
The Legislative, Finance, and Administration Committee meeting was held on May 12, 2014, at
5:00 p.m. with Chairman Lynn presiding. Members present were Mr. Hare, Mr. Slavin,
Mr. Rushe, Mr. Shevock. Other members of Council present were Mr. Anderson,
Mr. Dixon, Mrs. Williams (departed at 6:05 p.m.; returned at 6:14 p.m.; departed at 6:17 p.m.) , and
Mr. Hutchison. Mayor Bonar was also present (departed at 6:05 p.m.; returned at 6:15 p.m.) .
AGENDA ADDITIONS/DELETIONS
Mr. Rushe moved for approval of the agenda, seconded by Mr. Shevock and unanimously
carried.
Downtown Dover Business Improvement District (BID) Budget and Assessment (Tax) Rates
for Fiscal Year 2014/2015
Ms. Cheryl Russell, Tax Assessor, explained that the Business Improvement District (BID)
Ordinance adopted by City Council requires that Council adopt a BID budget and assessment every
year. She stated that this report represents the proposed budget and assessment for fiscal year
2014-15. Ms. Russell informed members that, based on the assessments provided by the City’s Tax
Office, the proposed revenue was $50,000, which would allow for the personnel and administration
expenses in the amount of $50,000.
Staff recommended approval of the proposed budget and assessment (tax) rates for Fiscal Year
2014/2015, as presented.
Mr. Hare moved to recommend approval of staff’s recommendation, seconded by Mr. Rushe,
and carried by a vote of four (4) yes (Hare, Rushe, Shevock, and Lynn )and one (1) no (Slavin).
Discussion - Responsibilities and Reporting Structure for the Mayor and City Manager and
Continuation of Full-Time Status for the Position of Mayor
Councilman Hutchison stated that it was very important for members to keep in mind that the City
of Dover has a City Manager form of government, and that the largest department within the City
is the Police Department, with a total of 130.5 people, a budget of $13.5M per year, with $500,000
per year in overtime costs and 700,000 per a year in extra duty work, and that the Police Department
also oversees a number of grants ranging from $200,000 to $400,000 annually. He reminded
members to also keep in mind that the Police Department has a very complex payroll system, and
that the City has strict guidelines and policies regarding promotions and discipline.
(City Clerk’s Office Note: The City of Dover has operated under a modified Council-City Manager
form of government since 1929.)
Mr. Hutchison stated that the Secretary of Homeland Security is in charge of the Delaware State
Police, noting that the Secretary is a professional, as is the City Manager for the City of Dover.
Referring to the City’s organizational structure, Mr. Hutchison informed members that, having
served as Police Chief as well as a part-time and full-time Mayor for the City, one (1) of his greatest
concerns was the serious disconnect of the Mayor from the structure of the City. He stated that, as
a result of the 1988 Consent Decree, the Mayor was removed from the Council Chambers, lost
connection with the City Manager and Council, and was left to do what he/she would like to do.
Paj 80
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 2
Mr. Hutchison advised members that, whether the City has a full-time or part-time Mayor, it is
absolutely necessary to have a job description as well as responsibilities and duties.
Mr. Hutchison expressed his opinion that the City of Dover has one (1) of the finest police
department’s in the State of Delaware; however, he indicated his concern with the fact that when a
Police Chief retires or leaves, only the Mayor is involved with the selection of the new Police Chief.
As an alternative, Mr. Hutchison suggested that members consider a change to require the selection
of the Police Chief by a Committee of three (3), consisting of the Mayor, City Manager and Council
President. He further recommended that following the Committee’s interview process, they make
a recommendation to City Council for confirmation. Mr. Hutchison stated that this proposed change
would bring the Mayor, City Manager, Council and Police Department under one (1) control and,
in his opinion, would work a lot better than the current method.
Mr. Hare expressed his opinion that the City of Dover needs to decide whether to have a strong
Mayor or City Manager type of government, noting that the City has had a hybrid type of government
for as long as he could remember. Mr. Hare stated that, in 1997, when the Mayor’s position became
full-time, he thought that the City was going to switch to a strong Mayor type of government but it
remained the same. It was his recollection that when the Mayor first became a full-time position,
a job description was created; however, over the years, it had been eliminated. Mr. Hare stated that
he did not disagree with the hiring policy and, whether or not the Mayor or City Manager is in charge
of the Police Department, he indicated that the selection of the Chief by a Committee of three (3)
would probably be good.
Mayor Bonar thanked Mr. Lynn for compiling the in-depth information provided on this topic, and
expressed his personal support of the Police Department. He indicated that when this topic was
discussed during the 1990s, the members involved, including himself, had the best intentions of a
having a system that would operate in the best interest of the City, noting that all of the debate and
discussion was prefaced by the phrase “as we perceive it.” Mayor Bonar expressed his opinion that
Mr. Hutchison’s suggestion for putting the Police Chief under the City Manager bears merit, but
suggested the possibility of creating a Committee with four (4) members for the selection process
for the Police Chief. He agreed with Mr. Hutchison that the complexities of the Police Department
are increasingly detailed and stated that it requires oversight by someone who is familiar with not
only day to day personal management procedures, but also budgeting and hiring procedures as well
as contract negotiations. Mayor Bonar expressed his opinion that, nine (9) times out of 10, the City
would not elect a Mayor with that type of expertise, but noted that those abilities could be realized
by involving the Council President, City Manager, and others in the selection process for the Police
Chief. Mayor Bonar reminded members that, ultimately, it was the Committee’s decision whether
to forward this matter to Council for full debate, but expressed his opinion that the public should be
provided with an opportunity to comment. Referring to the information provided with regard to this
topic, Mayor Bonar noted that there were a great number of municipalities throughout the region
which have the Police Chief under a City Manager form of oversight, and that it is indicative that
most cities with the same type of government as the City of Dover are satisfied with this type of
structure.
Paj 81
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 3
Mr. Lynn stated that it was important to separate the various issues surrounding this topic, noting
that the City’s type of government had become intermingled with the decision about whether or not
to limit or reduce the Mayor’s powers as well as the decision regarding the part-time/full-time
Mayor.
Noting that the Legislative and Finance Committee Report of January 25, 1995 and the Special
Council Meeting minutes of January 29, 2004 reflect Mr. Hutchison’s advocacy for a full-time
Mayor in the City of Dover, Mr. Lynn questioned what had changed Mr. Hutchison’s position
regarding this topic. Responding, Mr. Hutchison stated that the status of the full-time Mayor today
has changed, compared to what it was when he held the office. For example, he stated that one (1)
of the duties and responsibilities of the full-time Mayor was to handle economic development for
the entire City; whereas, today there are three (3) additional positions which handle economic
development. Additionally, Mr. Hutchison explained that there have been many changes over the
last 10 years with regard to salaries, benefits, payroll, and the complexities of contracts and he
believed that it would be unfair for the Mayor to be responsible for these matters without having the
training to do so. He stated that he still wholeheartedly supported a full-time Mayor but explained
that the City cannot have a full-time Mayor if he/she is not going to be given and held accountable
for specific duties and responsibilities. Mr. Hutchison stated that the Mayor could maintain
responsibility for the Police Department, with the City Manager running the daily operations and
reporting to the Mayor.
Mr. Hare stated that he did not have any objections to the City of Dover having a Mayor-Council
form of government or a full-time Mayor, but noted that in cities with a Mayor-Council form of
government or a strong Mayor, the Mayor typically has an assistant with similar qualifications and
responsibilities as a City Manager. Mr. Hare expressed his opinion that the Mayor of the City of
Dover be given more responsibility.
Councilman Anderson stated that Mr. Hutchison had raised valid points, and noted that having input
from the City Manager, or City’s Manager representative, and the Council President, or the Council
President’s representative, would be a very sensible approach for hiring of a replacement Police
Chief. Mr. Anderson expressed his opinion that this type of advice and overview would be helpful
in the future but noted that it had not been necessary in the past because the City of Dover Code does
not allow for outside recruitment for the Chief of Police. He shared his belief that most promotions
should be made from with inside the City but that the complete elimination of potential candidates
not employed by the City narrows the field. Mr. Anderson suggested that the City conduct a review
of the entire process for hiring the Police Chief. He stated that the idea that members of City Council
should confirm the selection for Police Chief makes sense, since the Mayor’s other appointments
require such confirmation. He stated that he was not in favor of the idea of completely restructuring,
noting that there was a movement in the U.S. to restore some measure of accountability to elected
officials and law enforcement. Mr. Anderson also reminded members that Council had recently
moved the Economic Development Office under the Mayor’s Office which he believed had proven
to be a beneficial decision with positive results, in terms of helping businesses grow and bringing
jobs to the City.
Paj 82
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 4
Councilwoman Williams reminded members that, for varying reasons, the last two (2) full-time
Mayors did not complete their terms of office and that the recent change to four (4) year terms for
the Mayor and members of Council have markedly changed the Office of the Mayor. She also noted
that Council currently has the ability to discharge the city manager; however, there is no method,
beyond resignation, for recourse of action if Council is dissatisfied with the Mayor. She expressed
her concern that the City does not have a provision for recall or impeachment, noting that it could
present a problem when there is a full-time Mayor.
Mr. Slavin stated that he was a proponent of a full-time Mayor in 2004 and remained a proponent
for several reasons. He expressed his belief that, beyond the Mayor’s veto power, Council needs a
checks and balance system with a full-time presence. He stated that Council should use this an
opportunity to further delineate the two (2) branches of government, noting that the hybrid approach
has blended them and led to confusion. Mr. Slavin emphasized that the City of Dover needs a full-
time Mayor because it is a full-time city.
Referring to information compiled by the National League of Cities regarding forms of government,
Mr. Lynn reviewed the characteristics of a Mayor-Council form of government and shared his
opinion that the City of Dover’s form of government has suited the City well throughout its history
and that there is plenty of room to grow into this form of government, given that New York,
Chicago, Philadelphia, and Los Angeles have a similar form of government. In regard to a full-time
or part-time Mayor, he noted that the issue was discussed in incredible detail in both the 1990s and
in 2004 and that, in both instances, City Council was of the decision that the position of Mayor
should be full-time. Additionally, Mr. Lynn stated that a referendum was held which demonstrated
that the citizens of the City were in favor of a full-time Mayor and, expressed his belief that, nothing
had occurred to lead members to conclude anything to the contrary. With regard to the powers and
duties of the Mayor, Mr. Lynn shared a sentiment expressed by Councilman Perza that “the guys
with the guns ought to answer to an elected official.” He noted his belief that it would be a
dangerous precedent for the Dover Police Department to report to a bureaucrat or unelected official,
like the City Manager. Referring to the powers and duties of the Mayor, Mr. Lynn stated his opinion
that there is room to rein in the financial aspect of the Mayor’s role with regard to the Police
Department, explaining that the budgeting for the Police Department should be proactive instead of
reactionary to allow Council the opportunity to have an actual role in forming some of the financial
policies of the Police Department, and provide the Controller/Treasurer or another City staff member
an opportunity to maintain the financial checks and balances within the Police Department.
Mr. Hutchison stated that the City Manager is the City’s paid expert who works for the Mayor and
Council. It was his belief that the Police Department runs itself for the most part but that placing the
City Manager in charge of the daily operations would provide a chain of command with the Police
Chief reporting to the City Manager, who reports directly to the Mayor and Council. It was
Mr. Hutchison’s opinion that this type of organizational structure would allow the Mayor to remain
as the “point person” for the City while bringing the total City together beginning with the Mayor,
City Manager, and Council.
Paj 83
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 5
Mr. Lynn cautioned members that decisions in contravention of the City’s Charter should not be
made based upon the exigencies of the moment, in a rush to judgement. He stated that the formation
of the City’s government was made with long deliberation and should not be changed over the course
of a week as the result of one (1) event. Mr. Lynn agreed that the current City Manager, Mr. Scott
Koenig, was a professional; however, he reminded members that within the past three (3) years, there
were discussions in which the judgement and ethics of the former City Manager were called into
question. Noting that no single office in the City is immune from corruption or doubt or any other
character flaws, Mr. Lynn expressed his opinion that the authority of the Police Department should
be placed in the hands of an elected official who the electorate controls, rather than in the hands of
a bureaucrat, whom it would take nine (9) members of Council to rein in.
Mr. Hare agreed that these issues could not be resolved in one (1) meeting. He expressed his
preference that members discuss and decide upon the appropriate form of government for the City,
prior to entertaining discussion regarding the full-time or part-time Mayor.
In regard to the issue of having a full-time Mayor, Mr. Anderson noted that more than 70% of the
citizens previously voted in the referendum and that he had not heard a groundswell for change in
this regard but the opposite. He expressed that he would like to see someone who is extraordinarily
competent and capable in this position but that the budgetary matters for all departments should go
through the City Manager’s Office. In regard to the Police Department reporting the City Manager,
Mr. Anderson cautioned members to remember that the City’s Charter prohibited Council from
engaging with employees under the direction of the City Manager without permission, noting that
he would not want to be “out of the loop” when it comes to something as important as law
enforcement.
Responding to Mr. Anderson, Mr. Hare stated that he would favor a change to a City Administrator
who reports to the Mayor with Council’s approval, instead of having a City Manager, if that were
the decision of the Council.
Mayor Bonar reviewed the “Current Trends” in municipal forms of government compiled by the
National League of Cities. He encouraged members to review the valuable information available
on these issues. He stated that the members had brought up really good points and that the
Committee would have to decide how to proceed. Mayor Bonar noted the possibility of creating a
group to explore these issues in more detail, reminding members that there would be several months
in which to consider these matters before the legislative session occurs in January. He suggested that
an opportunity be provided for constituents to express how they feel.
Mr. Edward Christian, Jr., 9 Pennwood Dr., Dover, stated that he was accustomed to the City
Manager-City Council form of government, in which the Mayor was chosen by City Council
members to serve as the presiding officer of City Council and assigned a number of ceremonial
duties. He noted that under this form of government, a City Manager was hired by and served under
the direction of the City Council, and if he/she was not suitable for the job, then he/she was fired by
City Council. In regard to the position of Mayor, Mr. Christian indicated his belief that the duties
and responsibilities for the Mayor of the City of Dover were developed based upon the qualifications
and areas of expertise of the individual who held the office when it became a full-time, salaried
Paj 84
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 6
position, and questioned whether the City would find anyone else with that level of expertise to
manage the City. He stated that voters often make decisions based on their personal “comfort zones”
but rely on the elected officials to lead and guide. Mr. Christian stated that elected officials have a
tendency to make decisions based upon what will keep them in office; however, he encouraged
members to make decisions based on what needs to be done for the benefit of the citizens of the City,
while keeping in mind what other cities and localities are doing, as well as relevant history.
Mr. Lynn reminded members that this was not necessarily an item which the Committee would need
to take action on; however, action could be entertained. As advised by the City Clerk,
Traci McDowell, he noted that the Consent Decree may prohibit a strong Mayor.
Mr. Rushe stated his belief that the Committee needs to hear more public comment before taking any
action.
Mr. Hutchison agreed that the City should allow for further public input and discussion.
Mayor Bonar agreed that further public input seemed warranted, noting that this evening’s discussion
revealed a strong consensus that these topics should at least be considered.
Mr. Hare moved to bring this matter back to the Committee to allow for public input and further
discussion in regard to the different forms of government.
Responding to Mr. Lynn, Mr. Hare stated that the intent of his motion was for the Committee to
examine the form of government issue prior to any further discussion regarding the role of the
Mayor.
After further clarification and discussion, Mr. Hare withdrew his motion.
Mr. Slavin moved for the Committee to continue discussion of the responsibilities and reporting
structure for the Mayor and City Manager and continuation of full-time status for the position of
Mayor, following the 2014 Special Mayoral Election, seconded by Mr. Hare.
Mr. Slavin clarified that his motion was to include future discussion of the matter as introduced on
this evening’s agenda.
Mr. Anderson noted his support for the motion.
On a call for the question, the motion for the Committee to continue discussion of the
responsibilities and reporting structure for the Mayor and City Manager and continuation of
full-time status for the position of Mayor, following the 2014 Special Mayoral Election, carried
by a vote of four (4) yes (Hare, Rushe, Shevock, and Slavin), and one (1) no (Lynn).
Paj 85
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 7
Proposed Planning and Inspections Fee Increases
Mrs. Ann Marie Townshend, Director of Planning and Community Development, reviewed Planning
and Inspections fee increases proposed for FY 2014/2015. She reminded members that the proposed
fee increases were previously presented to members of City Council during the City Council Budget
Workshop of March 31, 2014.
Mrs. Townshend stated that in reviewing the Planning and Inspections fees, she focused on 1) the
fees that do not come close to cost recovery; and 2) the last time each fee was reviewed. Referring
to the fees that do not come close to cost recovery, she expressed her opinion that it did not make
very good business sense to place the burden on the taxpayers for a service that benefits one (1)
person. For example, she stated when there is a Board of Adjustment application, the meeting costs
approximately $600, including $75 per Board member in attendance, legal fees to have legal counsel
available, and the costs associated with a newspaper ad and mailing notices. Mrs. Townshend
explained that the current fee for a residential variance was $200 and the current fee for a
commercial variance was $300; therefore, the fees for this service do not come close to recovering
the City’s costs. She stated that staff does advise interested applicants when they believe the
applicant does not have a very strong case; however, the applicants often decide to proceed.
Mrs. Townshend explained that the proposed increases include several fees in the planning
application and building permit category that had not been reviewed or updated since 2004, and that
the City’s rental permit fees had not been changed since 2000. She also stated that the City’s public
occupancy permit fees had not been adjusted since 1993 and informed members that these permits
cost a great deal of staff time to administer because they require the fire marshals to conduct annual
site inspections.
Mrs. Townshend stated that she also tried to keep the economic climate in mind while reviewing the
fees to make sure that the proposals would not jeopardize economic recovery. She noted that the
proposed fee increases are modest and do not significantly increase the cost of doing business but
would allow the City to recover more of the costs associated with providing services.
In regard to the proposed increase for the sign permit fee, Mrs. Townshend explained that many of
the City’s sign permits are very near to the minimum fee and that the penalty for installing a sign
without a permit is that the permit fee is doubled. She stated that staff had experienced people
laughing at them when they inform them that their permit will increase to $30 or $50 as a result of
the penalty.
Mrs. Townshend informed members that she also reviewed fees for other agencies throughout the
State of Delaware and that, in all cases, the City of Dover’s fees, including the proposed increases,
were below many other localities and in line with others.
Mr. Slavin reminded members that fee increases are always a difficult issue and when the economy
is good, the public asks why the City is trying to slow down the economy and when the economy is
bad, why the City is trying to make it harder to do business. He shared his appreciation for the way
that Mrs. Townshend presented the information and the inclusion of the last time each fee was
adjusted. Mr. Slavin questioned if there was any thought to reintroducing the concept of putting fees
Paj 86
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 8
on an escalator that would allow for a minor adjustment every other year. He stated that he had
talked to a number of people in the business community who said that they would rather see small
adjustments to fees than a one time adjustment every so many years.
Responding, Mrs. Townshend stated that when staff proposed an escalator for the business license
fee in 2010, the business community was opposed. She stated that whichever way staff approaches
fee increases proves to be the opposite of the way that the business community would want it at that
point in time. She stated that the key to the proposed fee increases was keeping the adjustments
modest, explaining that, if the City really wanted to correct not having increased the fees for 10 to
20 years, staff would have proposed more significant increases. For example, Mrs. Townshend
noted that most of the public occupancy permits, which require the fire marshals to conduct annual
fire safety inspections, were currently $25 per year and were proposed to increase to $50 per year.
Mr. Slavin questioned whether the proposed increases had been vetted by the business community
and whether staff had contacted the chamber of commerce. Responding, Mrs. Townshend stated that
she had not spoken to the chamber of commerce but offered to do so. She stated that the difference
between the current proposal and those considered in previous years was that the previous proposals
included significantly larger increases. Mrs. Townshend reminded members that the rental permit
fees were always controversial. She stated that, as proposed, the rental permit fee would increase
from $90 to $100 for a house per year and expressed her opinion that rents have surely increased well
over $10 within the past 14 years.
Mr. Slavin expressed his disagreement with a cost recovery model for fees, stating that, although it
is not the case with the current proposal, aligning services with the costs to recover the services
typically makes the City overly aggressive on fees. He indicated that many of the individuals who
access these services have already paid for them through property taxes and other costs. Mr. Slavin
cautioned that the City needed to be very careful to ensure that individuals are not denied their due
process rights because they cannot afford the fees associated with services, such as Board of
Adjustment applications.
Responding to Mr. Slavin, Mrs. Townshend stated that even with the proposed increase, the City
would not come close to recovering the costs associated with conducting a Board of Adjustment
meeting. She informed members that a review of the fees for municipalities in Sussex County
revealed fees of more than $1,000 for the Board of Adjustment because it is a costly process.
Mrs. Townshend indicated that while there is the belief that these services are paid for by the general
tax base, the general tax base covers only a very small portion of the City’s operations.
Mr. Lynn suggested that the Committee table this matter and send notice out to the chamber of
commerce.
Mr. Hare expressed his opinion that the City should have a public hearing regarding this matter to
provide the chamber of commerce as well as the public an opportunity to speak. He stated that he
would like to see the inclusion of an escalator, so that the City will not have this to address this again
in the future.
Paj 87
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 9
Mr. Hare moved to defer consideration of the proposed Planning and Inspections fee increases to
allow staff to contact the chamber of commerce and schedule and public hearing, seconded by
Mr. Slavin.
Mr. Slavin stated his belief that the Town of Smyrna, Delaware, has an escalator built into the
Town’s ordinances for all of these fees, and asked staff to investigate and provide members with the
information.
Mrs. Townshend stated that staff was not opposed to an escalator but reminded members that the last
time it was brought forward, the business community was opposed. Responding, Mr. Slavin
indicated his belief that the business community was previously opposed to the idea because they
did not hear about it prior to Council discussions.
Mr. Hare requested that staff also provide a fee comparison.
On a call for the question, the motion to defer consideration of the proposed Planning and
Inspections fee increases to allow staff to contact the chamber of commerce and schedule a
public hearing was unanimously carried.
Authorization for New Position - Assistant City Manager
Mr. Scott Koenig, City Manager, informed members that during the City Manager's evaluation last
fall, City Council indicated that the City Manager's office needed additional staff to improve
response times to various inquires and concerns. As a result of these comments, the City Manager
was directed to evaluate additional administrative capacity to improve the overall function of the
office. He stated that two (2) position descriptions were reviewed, an Executive Assistant for the
City Manager and an Assistant City Manager.
Mr. Koenig stated that the Assistant City Manager position currently existed in the City’s hierarchy,
although it had not been filled for more than 20 years. He explained that an Assistant City Manager,
rather than an Executive Assistant for the City Manager, would provide greater assistance with
respect to the needs of the City Manager's Office as well as the citizens of the City, especially with
the complexity of the issues that the City Manager’s Office has begun to handle on a daily basis,
including contract negotiations, land purchases, and the general operation of a growing city. The
Assistant City Manager position would also provide more value in the area of succession planning
for the upper level of the organization. Mr. Koenig stated that the Assistant City Manager position
was valued as a Grade 136 with a market salary range of $105,189 - $122,032.
Based on the long-term needs of the City, staff recommended authorizing the City Manager to
include one (1) Assistant City Manager position in the FY 2015 budget request for the City
Manager’s Office.
Mayor Bonar commended Mr. Koenig for bringing this matter forward for consideration, noting that
it was not an easy topic, given the current fiscal constraints but it is something that needs to be done.
Mayor Bonar stated that the City is not as easy to run as it once was and he his aware of the
Paj 88
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 10
inordinate amount of time that the City Manager has to spend on the telephone and in negotiating
sessions.
Mr. Slavin moved to defer the item for consideration during the upcoming Special Council Meeting -
Budget Review, seconded by Mr. Shevock. By a vote of two (2) yes (Shevock and Slavin), and three
(3) no (Hare, Lynn, and Rushe) the motion failed.
Mr. Hare moved to authorize the City Manager to include one (1) Assistant City Manager position
in the FY 2015 budget request for the City Manager’s Office but that the position not be filled until
the budget has been adopted, seconded by Mr. Rushe. By a vote of two (2) yes (Hare and Rushe),
and three (3) no (Lynn, Shevock and Slavin) the motion failed.
Mr. Lynn moved to authorize the City Manager to include one (1) Assistant City Manager position
in the FY 2015 budget request for the City Manager’s Office. The motion failed due to the lack of
a second.
Mr. Slavin moved to defer the item, seconded by Rushe and carried by a vote of four (4) yes
(Hare, Rushe, Shevock, and Slavin) and one (1) no (Lynn).
2015 Property Revaluation and Reassessment
Ms. Cheryl Russell, Tax Assessor, informed members that, according to the City Code, the
revaluation and reassessment of all real property may be conducted this year, since five (5) years
have passed since the last reassessment. She stated that staff sent a Request for Proposals (RFP) out
in April so that the City could budget for the reassessment for FY 2015. Ms. Russell indicated that
May 1, 2014 was the deadline to turn in the sealed bids to the City of Dover, and one (1) bid for the
2015 reassessment was received in the amount of $125,300. She stated that staff would be able to
reduce the figure to $108,000 if they complete the printing and mailing.
Ms. Russell reminded members that a reassessment is an effort to value all real property at its fair
market value in an equitable and uniform manner and shifts the burden of tax among the tax payers.
She stated that, after several years without a reassessment, some properties will be over-assessed,
some under-assessed based on market and economic conditions.
Staff recommended approval to proceed with the 2015 Property Reassessment.
Responding to Mr. Hare, Ms. Russell confirmed that the complete reassessment would cost $108,000
and explained that the difference between the 2015 Property Reassessment and the reassessment
which was conducted five (5) years ago was that staff has gone out and looked at all of the properties
so it does not have to be a comprehensive reassessment. She stated that every property will receive
a letter with a new assessed value but that the firm would not have to physically review each property
like they previously did.
In response to Mr. Shevock, Ms. Russell confirmed that the 2015 Property Reassessment would be
conducted by the same firm that conducted the previous reassessment.
Paj 89
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 11
Mr. Rushe questioned whether staff anticipated an overall increase or decrease in property taxes.
Responding, Ms. Russell stated that, for a lot of the commercial properties, staff had noticed that
transfers were higher than the current values but, for the most part, the residential property values
had decreased slightly in some areas while others were staying about the same. She indicated that
the values for new construction were currently very accurate. Ms. Russell reminded members that
the reassessment is revenue neutral, so there will be no impact to the tax base for the revaluation.
As a point of clarification, Mr. Slavin stated that the reassessment is a revenue neutral exercise;
therefore, while the assessed value may go up or down, the City is not allowed to use that as an
excuse for increasing taxes. City Council would have to set the tax rate appropriately in order to
increase or decrease revenue.
In response to Mr. Hare, Ms. Russell confirmed that the City would spend $108,000 on the
reassessment and would not receive any additional revenue as a result.
Concurring with Mr. Slavin, Ms. Russell stated that it is easier to defend values when they are closer
to what the market is indicating.
Ms. Slavin noted that if you sell a property that has not had an assessment in 15 years, you would
pay the tax rate from 15 years ago rather than current market rate.
Councilman Anderson questioned whether the State law that makes reassessments revenue neutral
also allowed for the recovery of the cost of the reassessment. Responding, Ms. Russell stated this
question was raised in 2000 and, as she recalled, Delaware did not allow for the recovery.
Mr. Anderson stated his belief that the law allowed up to 15% of the value of the assessment to be
recovered and requested that staff look further into the matter.
Mr. Slavin moved to recommend approval to proceed with the 2015 Property Reassessment,
as recommended by staff, seconded by Mr. Shevock and unanimously carried.
FY14 Edward Byrne Justice Assistance Grant Program - Police Vehicle Computer and Video
Technology Upgrades
Police Chief Paul Bernat informed members that the Dover Police Department recently received its
annual allocation from the Office of Justice Programs (OJP) for the 2014 Justice Assistance Grant
(JAG). Similar to previous years, Dover Police Department was identified as a disparate funding
agency along with Kent County because there is no law enforcement function at the county level,
unlike Newcastle County in northern Delaware. This disparate condition requires the submission
of a joint grant application for the two (2) agencies. Although no funds were designated for Kent
County in the allocation document, a Memorandum of Understanding would be completed and
signed by both agencies stating that Kent County will waive any claim to the funding on this grant.
Chief Bernat stated that the Dover Police Department intends to upgrade/replace eight (8) vehicle
computer/video systems. He explained that a portion of the upgrades would be purchased for new
vehicles that would be coming on line during FY 2015. Chief Bernat informed members that on
April 8, 2014, Windows XP became obsolete and the State of Delaware Division of Communications
Paj 90
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 12
discontinued support for it and, as a result, the remainder of the grant funds would be used to retrofit
older vehicle computer/video systems to bring those units back online and in compliance with
Windows 7, the current operating system. He stated that the department was currently short-handed
on working computers in vehicles, and was hoping to get approval to submit this application early,
so the funding could be released earlier by the United States Department of Justice (USDOJ).
Chief Bernat indicated that the department also planned to purchase COBAN systems, a sole vendor
purchase, which had been in use by the Delaware State Police and other agencies throughout the state
and received good reviews from both the user and maintenance perspectives. As result, the
department would purchase the new systems in two (2) or more increments to retrofit older the
model vehicles first, as scheduling permits, and retrofit the new vehicles during the FY 2015
budgeted vehicle replacement cycle.
Chief Bernat stated that the City of Dover had been allotted a grant totaling $51,549 and that total
project budget was $81,549.
Staff recommended approval of the grant project, as requested.
Mr. Hare moved to recommend approval of the grant project, as recommended by staff,
seconded by Mr. Rushe and unanimously carried.
Proposed Revenue Policy - Police Extra Duty/Voluntary Overtime
Mrs. Donna Mitchell, Controller/Treasurer, reviewed the Proposed Revenue Policy for Police Extra
Duty/Voluntary Overtime (Attachment #1). She explained that she had a question in regard to
section I. Policy, which she and Police Chief Paul Bernat were unable to discuss, and she
recommended that the text indicated in red font be included in the policy, as presented. Referring
to section IV. Requests for Extra Duty Officers, Mrs. Mitchell stated that Chief Bernat requested the
insertion of the first paragraph of subsection F and she subsequently recommended the inclusion of
the second paragraph. In reference to section V. Payment Methods, Mrs. Mitchell noted her
recommendation for the addition of a second paragraph under subsection B. City Sponsored Events,
as indicated in red font. She stated that this policy had been fully vetted with Dover Downs and
Chief Bernat and that they had “signed off” on the policy with the indicated changes. Mrs. Mitchell
noted that former Police Chief James Hosfelt had been instrumental in assisting her with drafting
the policy.
Staff recommended adoption of the policy.
Responding to Mr. Hare, Mrs. Mitchell stated that the City would earn money from extra duty under
the proposed policy and that she had calculated the revenue for the budget.
In response to Councilman Hutchison, Mrs. Mitchell confirmed that she was happy with the policy
as presented.
Mr. Hare moved to recommend adoption of the Revenue Policy - Police Extra Duty/Voluntary
Overtime, as recommended by staff, seconded by Mr. Rushe and unanimously carried.
Paj 91
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 13
Proposed Ordinance #2014-09 Amending Chapter 50 - Floods
Mrs. Ann Marie Townshend, Director of Planning and Community Development, reviewed Proposed
Ordinance #2014-09 amending Chapter 50 - Floods; Chapter 22 - Buildings and Building
Regulations, Article III - Building Code, Section 22-61; and Appendix F - Fees and Fines, noting that
it is a time sensitive matter. Mrs. Townshend explained that the proposed ordinance would remove
the language currently found in Chapter 50 of Dover Code and replace it with the current standards
and regulations which are compliant with the Federal Emergency Management Agency (FEMA).
She stated that the City is a participating community in the National Flood Insurance Program
(NFIP) and, as long as the City complies with certain FEMA required practices, property owners
within the City are able to have flood insurance. Mrs. Townshend stated that in order to continue
participation in the NFIP, the City is required to implement standards for construction activities
within the 100-year floodplain and, when FEMA updates the Flood Insurance Rate Maps (FIRM),
the City is required to update the City’s regulatory requirements to comply with the most current
FEMA standards. Mrs. Townshend explained that FEMA is in the process of updating the FIRM
for Kent County, with the new maps to take effect on July 7, 2014, and all NFIP communities must
have updated regulatory requirements in place by July 7, 2014, when the new maps take effect.
Mrs. Townshend stated that the Department of Natural Resources and Environmental Control
(DNREC) hired a consultant to develop model ordinances, approved by FEMA, for Delaware's
communities to adopt. She explained that many of the provisions contained in the 2009 and 2012
International Code Council (ICC) series of building codes already comply with the FEMA standards,
and the City has adopted the 2009 ICC codes. The model ordinance that staff used in updating the
City’s regulation is a code coordinated model that recognizes the standards in the building code and
does not duplicate or reiterate these standards. Use of this ordinance minimizes the likelihood for
conflict and confusion among chapters of the Dover Code. Mrs. Townshend noted that the
regulations that apply directly to buildings are within in the building code and that non building
related flood regulations were proposed for inclusion in Chapter 50.
Staff recommended adoption of Proposed Ordinance #2014-09.
Mr. Hare moved to recommend adoption of Proposed Ordinance #2014-09, as recommended
by staff, seconded by Mr. Slavin and unanimously carried.
Proposed Ordinance #2014-10 - FY 2014 Budget Amendment
In regard to the Committee’s discussion of the Proposed Planning and Inspections Fee Increases,
earlier during the meeting, Mrs. Donna Mitchell, Controller/Treasurer, informed members that she
would be contacting the chamber of commerce prior to the Special Council Meeting - Budget
Review to discuss any changes proposed for the next fiscal year budget and that she could
incorporate the proposed Planning and Inspections fees.
Mrs. Mitchell reviewed Proposed Ordinance #2014-10 - FY 2014 Budget Amendment, noting that
it was the second set of budget amendments for Fiscal Year 2013/2014. She reminded members that
the first budget amendment for Fiscal Year 2013/2014 (Ordinance #2013-08) was approved by
Council on January 27, 2014. She explained that the proposed budget amendment adjusts the
revenues to reflect the current forecast; reflects the pension accounting changes, shifting the fund
Paj 92
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 14
expenses back to the Divisions and interfund service line items in the General Fund,
Water/Wastewater Fund and Electric Revenue Fund; incorporates internal budget adjustments
completed in accordance with the budget amendment authority of the City Manager; transfers
$77,000 of savings in temporary help for the Library to the Inspections demolition account to fund
the Council action approved for increased demolition cost; and reflects operating expense reductions
based on annual budget reviews with the City Manager.
Mrs. Mitchell stated that the proposed budget amendment also included additional items, some of
which had previously been discussed with City Council, including the Salt Barn, Street Division CIP
budget of $50,000 which was inadvertently dropped off in the project carry forwards in the January
ordinance; an additional $15,000 for Kent Conservation District storm water; demolition of the
White Oak Park recreation building with a current estimate of $70,500 in the Recreation Division
CIP; Old Library clean up with a current estimate of $35,000 in the Library Division CIP; $12,000
for contractual services in the Finance Division for an agreed upon procedure engagement with
current auditors to review internal control procedures, revenue procedures and cash handling
procedures at Recreation, Library and Police Divisions; and a Water Utility, U.S. 13 Water Main,
VWQ0907, lawsuit settlement with Eastern States Construction in the amount of $141,600.
Mrs. Mitchell noted that all of these items were being funded through salary savings within the
budget and transfers to the Capital Project Fund from the General Fund.
Staff recommended adoption of Proposed Ordinance #2014-10.
Mr. Lynn stated that he would not be supporting the budget amendment because he could not support
the demolition of the White Oak Park recreation building. He explained that he could not imagine
the City spending $70,500 to demolish a building which the City allowed to become derelict, and
essentially demolished by neglect. He expressed his opinion that it is money wasted and that the
building could have been used to the benefit of the public and it’s demolition deprives an entire
portion of the City of recreational facilities.
Mr. Slavin noted that he had recently discussed his concerns regarding the fungibility of the City’s
funds, specifically that salary savings are spread across other operational categories, with Mr. Wayne
Holden, Ad Hoc Financial and Operational Advisory Committee Chair. Mr. Slavin stated that he
deals with the discipline of leaving salary savings in the salary line and operational savings in the
operational lines everyday, in his job with the State of Delaware, and that he was encouraging
Mr. Holden to incorporate that into some of the Committee’s recommendations. In response to
Mr. Slavin, Mrs. Mitchell stated that with the accounting change for the pensions, the City’s Annual
Required Contribution (ARC), as determined by the actuary, is based on budgeted salaries. She
explained that if the City has attrition, the City might not meet that ARC because the City would not
have the salary base there with that percentage. She stated that she and Mr. Koenig had discussed
the possibility of recommending a policy change that would require any salary savings to go toward
those liabilities to ensure that the City meets the ARC. Mr. Slavin stated that he would support such
a policy change.
Paj 93
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 15
Mr. Hare moved to recommend adoption of Proposed Ordinance #2014-10, as recommended
by staff, seconded by Mr. Rushe and carried by a vote of three (3) yes (Hare, Rushe, and
Shevock) and two (2) no (Lynn and Slavin).
Proposed Ordinance #2014-14 Amending Appendix D - Downtown Dover Business
Improvement District (DDBID), Article III - Establishment of DDBID, Section 3 - Geographic
Boundaries, and Section 5 - Management Company
Mrs. Ann Marie Townshend, Director of Planning and Community Development, reviewed Proposed
Ordinance #2014-14, explaining that it was brought to her attention by Mrs. Donna Mitchell,
Controller/Treasurer, that there was a discrepancy between the City’s Dover Downtown Business
Improvement District (DDBID) ordinance and the composition of the Downtown Dover Partnership
Board of Directors, which is the City’s management company under the DDBID statute.
Mrs. Townshend informed members that in drafting Proposed Ordinance #2014-14, she and the City
Clerk had examined the State statute regarding the Business Improvement District, the City’s
ordinance regarding the DDBID and the composition of the DDP Board of Directors. Mrs.
Townshend stated that the proposed amendment specifically designates the Downtown Dover
Partnership as the "management company" for the Business Improvement District and removes the
requirement that a majority of the management company's Board of Directors be owners or owners'
designees of commercial properties within the Business Improvement District. Referring to lines
33, 35, and 36 of the proposed ordinance, she explained that the proposed amendments would
require the management company to be comprised of at least five (5) members who either own a
commercial property within the DDBID or are the designee of such owner, and remove the language
that requires that commercial property owners constitute a majority of the Board of Directors.
Mrs. Townshend stated that the State statute requires the five (5) commercial property owner
representatives, but does not require that a majority of the Board be commercial property owners.
She noted that, with the composition of the DDP Board, it would be almost impossible to have such
a majority.
Mrs. Townshend stated that the proposed ordinance would help fix the discrepancy, and the she was
also working with Mr. Greg Moore, DDP President and Mr. Gerry Street, DDP member, to address
a change to the DDP By-laws.
Staff recommended adoption of Proposed Ordinance #2014-14.
Mr. Slavin moved to recommend adoption of Proposed Ordinance #2014-14, as recommended
by staff, seconded by Mr. Shevock and unanimously carried.
Proposed Reinstatement of the Fee Waiver Provision for Tax Exempt Properties
Mr. Slavin reminded members that during their meeting of January 13, 2014, the Committee
recommended adoption of Proposed Ordinance #2014-01 amending Chapter 102 - Taxation, Article
IV - Abatement of Real Estate Taxes; Appendix C - Downtown Redevelopment, Article II -
Definitions and Article III - Eligibility; and Appendix E - Commercial and Industrial Building
Redevelopment, Article II - Eligibility, to require compliance with Section 1-13 - Clean Hands;
provide for revocation of the incentives for beneficiaries who are delinquent on obligations to the
Paj 94
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 16
City; and make tax exempt properties ineligible for the incentives, which was adopted by City
Council on February 10, 2014.
Mr. Slavin expressed his belief that ordinance #2014-01 was intended to be a Clean Hands ordinance
which would ensure that those who were receiving the incentives had “clean hands” and did not have
any other issues with the City, and that he did not realize at the time the ordinance was considered
that it would also strip away the incentive program for non-profit organizations. He stated that the
adoption of the ordinance has had an effect on two (2) large not-for-profit organizations that have
been significant to the downtown Dover revitalization.
Referring to Line 119 of Proposed Ordinance #2014-01, Mr. Slavin proposed that the Committee
recommend reinstatement of the incentive program for the subject properties that are exempt from
City of Dover real estate taxes.
Councilman Anderson stated that this is a very important provision because much of the
development includes not-for-profits, including some community projects which are a very important
part of the revitalization of downtown.
Responding to Councilman Hutchison, Mr. Slavin stated that he had not discussed this proposal with
either the City Manager or Controller/Treasurer to determine the potential budgetary impact.
Mrs. Donna Mitchell, Controller/Treasurer, stated that she had not quantified the financial impact
of this proposal and questioned whether the issue with the proposal was the financial impact or the
general concept.
Mr. Lynn stated his belief that the staff would be aware of any financial impact, since this language
had been previously removed from the ordinance.
Mrs. Ann Marie Townshend, Director of Planning and Community Development, clarified that non-
profits can qualify for the incentives as long as the property is not tax exempt. As an example, she
stated that, earlier in the day, staff had approved the incentives for the Inner City Cultural
League, Inc., a non-profit which qualified for the incentives because the subject property was not tax
exempt.
Mrs. Townshend stated that staff had reviewed the history of incentives for tax exempt properties
since 1998 and could not find any record of a tax exempt property applying for the incentives since,
except Bayhealth, which applied in 2008. She stated that Wesley College and the State of Delaware,
which are two (2) other major tax exempt organizations within the City, have not applied for or
utilized the incentives and have paid all of the applicable fees.
Noting her belief that this proposal was based on Bayhealth, Mrs. Townshend stated that prior to
2008, there were no requests from Bayhealth to utilize the incentives. In 2008, the incentives were
utilized by Bayhealth for the addition of the parking garage and new podium building.
Mrs. Townshend stated that since 1998, the City had issued 141 building permits to Bayhealth, and
that they utilized the waiver on eight (8) of those permits, for which the City waived a total of
Paj 95
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 17
$572,248 in building permit fees and, based on that amount, $7,224.80 (10%) was paid to the
Downtown Dover Partnership. Mrs. Townshend noted that since 1998, the City had received
$260,498.50 for building permit fees from Bayhealth.
Additionally, Mrs. Townshend stated that staff also examined the staff time, since 2009, associated
with permits and inspections for Bayhealth, the State of Delaware and Wesley College, the larger
non-profits that do not pay any City of Dover property taxes. She stated that staff estimated that they
had spent 18 hours per year on inspections related to permits; 8 hours per year on annual life safety
inspections; and, in terms of specific building permits, the City had spent 356 staff hours conducting
onsite inspections related to building construction.
Mrs. Townshend explained that the idea behind making tax exempt properties ineligible for the
incentives was that the property owners are receiving a service but they are not paying property taxes,
whereas, other property owners who receive the incentives do pay property taxes. She clarified that
it was not an unintended consequence and that the information was included in the Committee action
form considered by the Legislative, Finance, and Administration Committee during their meeting
of January 13, 2014.
Responding to Mr. Slavin, Mrs. Townshend stated that the value of the construction for Bayhealth
had not been totaled but, in reviewing the data gathered by staff, she stated that the permits ranged
from $6.7M, $2M, $1.6M, and $9M. In response, Mr. Slavin suggested that members consider not
only the amount the City is losing in revenue but also how much the City is generating in
development.
Mr. Scott Koenig, City Manager, expressed his opinion that this matter was a policy issue and stated
that his preference, as indicated in the Committee action form considered by the Legislative, Finance,
and Administration Committee during their meeting of January 13, 2014, was that tax exempt
property not be eligible for incentives that relate to the General Fund. He noted that there are some
instances in which Bayhealth owns property that is revenue generating and still on the tax rolls.
Mr. Koenig explained that although Bayhealth has invested a substantial amount of capital in the
City, Bayhealth probably would have invested that capital regardless of whether the incentives were
offered because the City provides services, including utilities, police and fire, which are all
components of building a large industrial facility; in this case, a facility serving as a community
hospital. He expressed his desire that tax exempt properties not receive an additional incentive
package because of their tax exempt status, since the City does provide services. Mr. Koenig stated
his belief that these organizations can plan their projects out and afford to include the components
related to these incentives in their business plan.
Mr. Koenig reiterated his request that, from a policy standpoint, tax exempt properties not qualify
for incentives related to the General Fund.
Mr. Slavin moved to recommend that staff be requested to prepare an ordinance to reinstate
the incentives for tax exempt properties, seconded by Mr. Shevock and unanimously carried.
Paj 96
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF MAY 12, 2014 PAGE 18
Mr. Lynn informed members that this was his last meeting as Chairman of the Legislative, Finance,
and Administration Committee, noting that he circulated his letter of resignation as Chairman of the
Committee to the City Clerk and members of the Committee early in the evening. He thanked the
members for their time and service, and stated that it was a pleasure working with all of the
members. Mr. Lynn indicated that did not wish to be reappointed as Committee Chair going
forward, given that his responsibilities in his campaign for the General Assembly were simply
overwhelming, such that he could not continue on in the leadership role that he served in for the past
two (2) years. He thanked former Council President Thomas Leary for appointing him to his
position as Committee Chairman, noting that it had been fun and an honor to serve, and that he
looked forward to working with members of the Committee in the future.
By unanimous consent, the meeting adjourned at 6:53 p.m.
Sean M. Lynn
Chairman
SML/TM/dd
C:\Users\ddevine\Dropbox\Denise\05-12-2014 LF&A.wpd
Attachment
Attachment #1 - Proposed Revenue Policy - Police Extra Duty/Voluntary Overtime
Paj 97
ATTACHMENT #1
LF&A Committee Meeting of 05/12/2014
CITY OF DOVER
REVENUE POLICY
POLICE EXTRA DUTY / VOLUNTARY OVERTIME
I. POLICY
The City of Dover Police Department recognizes the need for individuals and businesses to
have the services of police officers for special events or other functions that would not be
part of routine patrol. The Department will ensure that these needs are met by permitting
officers to work for these employers in their capacity as Dover Police Officers. Additionally,
the Department shall seek to secure grant funding to compensate officers for voluntary
patrols in and around specific areas of the city, supplementing the normal activities of the
Department.
Question: Why can’t grant work be done during routine schedules as long as we are not
going below minimum staffing levels for public safety?
II. PURPOSE
It is the purpose of this document to outline the extra duty billing rates and procedures to
our customers and granting agencies.
III. RESPONSIBILITIES
The Special Enforcement Unit Commander will be the Extra Duty Coordinator and will
assign clerical support as well.
The Extra Duty Coordinator shall be responsible for ensuring that all requests conform to
this Procedural Notice, City ordinances, and to oversee compliance with departmental
regulations.
The Chief of Police will determine if an extra duty request is a “must fill” position, due to
safety concerns to the public or to police. When this occurs, and no one has volunteered to
work the position, the Extra Duty Coordinator will be responsible for assigning this extra
duty job to an officer.
The Extra Duty Coordinator will be responsible for determining the adequate number of
officers to staff an event.
In cases where the staffing was underestimated the on-site supervisor or working shift
commander, at an event may, at his discretion, notify the employer and the extra duty
coordinator that additional officers are needed. Regardless of whether or not the employer
was able to be notified, the on-site supervisor may call in additional officers and the
employer will be billed accordingly.
Examples of “Special Events” requiring extra duty assignments include, but are not limited
to, events:
1. That require a City of Dover permit
2. Involve temporary road closures
3. Require right of way closures
4. Bicycle or foot races or walks
Paj 98
Revenue Policy – Police Extra Duty/Voluntary Overtime Page 2 of 10
5. Active traffic control- where an officer is actively/physically engaged in directing
vehicular or pedestrian traffic
6. Other special events
IV. REQUESTS FOR EXTRA DUTY OFFICERS
Any individual or private firm may request extra duty officers for work within the city limits of
Dover. Requests must be received between the hours of 8:00 am and 4:00 pm Monday
through Friday and can be mailed, emailed, faxed or brought in person to the Dover Police
Department. Applications must be received seven (7) days before the event. Any requests
made less than seven (7) days in advance are only processed with the understanding that
the assignment may not be filled. These requests will be directed to the Extra Duty
Coordinator, who will ensure that the requesting party understands the payment and
cancellation procedures.
The Extra Duty Coordinator will try to accommodate any schedule requests made by the
employer if made within one hour prior to the time of the event.
It shall be the responsibility of the Extra Duty Coordinator to review all requests and the
work required. The extra duty request will be denied if:
A. The employment is prohibited by State Law, City Ordinance, or Dover Police
Department Rules & Regulations.
B. The employment presents a potential risk of injury due to the lack of officers being
requested for the assignment.
C. The request requires the officer to act in any capacity other than a law enforcement
official.
D. The final determination of whether a permit is approved rests with the Extra Duty
Coordinator. While efforts will be made to comply with the assignment duties as defined
by the business representatives, the Dover Police Department maintains exclusive
rights in determining the number of officers required in order to maintain a safe
environment for all and dictate placement and duties.
E. On occasion, specific staffing levels and officer placement are influenced by City of
Dover Ordinances and unique circumstances identified by the City of Dover Council
regarding zoning approval for individual establishments and land parcels.
F. (Chief Bernat requested this addition) Major re-occurring special events within the City
of Dover may involve more defined and detailed staffing and planning processes that
may be outlined in a memorandum of understanding at the discrection of the Chief of
Police or his designee.
Recommendation of Controller/Treasurer – Any separate agreements must adhere to
the requirements of the Extra Duty Revenue/Voluntary Overtime Policy and all other
City of Dover personnel and financial policies and procedures as promulgated by the
City Council, City Manager, or Controller Treasurer.
Paj 99
Revenue Policy – Police Extra Duty/Voluntary Overtime Page 3 of 10
V. PAYMENT METHODS
Billing and processing for all extra duty accounts will be handled in accordance with current
City of Dover finance policies.
A. Non-Recurring permits
Employers who are using the extra duty services one time, or are determined by the
Extra Duty Coordinator as a high risk customer, must pay for services before the
assignment commences.
Officers can work additional hours with permission granted by the shift commander or
extra duty coordinator. If this should occur, the extra duty employer must pay the
additional charges on the next business day to the Extra Duty Coordinator. To prevent
this, the employer may pay for extra hours and if unused, will be reimbursed.
No officer is allowed to accept monies from an extra duty employer.
B. Extra Duty for City Sponsored Events
The cost of police personnel to maintain safety for the actual event, those officers
assigned to traffic and/or crowd control, will be absorbed by the City of Dover.
Controller Recommendation – City sponsored events will be staffed by officers
scheduled during the hours of the event. For events that required additional staffing
levels, regular overtime will be schedule and paid to those officers that actually work
overtime.
C. Extra Duty for Non City Sponsored Events
The Extra Duty Coordinator will schedule officers to work non-city sponsored events.
The expense associated with this extra duty will be the responsibility of the event
organizers. The Coordinator may also arrange for additional requests for police
services, such as money escorts or overnight security.
VI. REPORTING PROCEDURES
The officer may elect to go directly to the job site and report to the point of contact identified
on the assignment worksheet. That contact (or his/her designee) will be responsible for
completing the time-on-duty and time-off-duty sections, along with the Extra Duty Employer
section of the assignment worksheet. If the officer elects to do this, he/she must contact
the on-duty Shift Supervisor by telephone to be input into the CAD system.
VII. FAILURE TO APPEAR FOR EXTRA DUTY
An employer, upon realizing that the officer failed to appear, should notify the extra duty
coordinator at (302)- 736-7145 immediately and also call the on duty shift commander at
(302)736-7111.
Paj 100
Revenue Policy – Police Extra Duty/Voluntary Overtime Page 4 of 10
VIII. CANCELLATIONS OF EXTRA DUTY
A. Extra duty assignments will not be canceled less than one hour prior to the scheduled
start time, except as authorized by a Unit or Division Commander, during regular duty
hours, or after regular duty hours, the On-Call Lieutenant.
B. In the case of a departmental need or community emergency, the Chief of Police or
designee may cancel any extra duties assignments. The extra duty officers would then
be immediately available for service to the department.
IX. PROCEDURE FOR CANCELLATIONS OF EXTRA DUTY ASSIGNMENTS
NOTIFICATIONS
A. Cancellations by the extra duty employer should be made at least one hour before the
time the assignment is scheduled to begin. If cancellation is made in less than an hour
(with the exception of a natural disaster) the customer will be charged and the assigned
officers will be paid a minimum of 3 hours as per the FOP Union contract. When an
extra duty assignment is canceled by an extra duty employer the following procedure
will be followed:
1. The person who receives the cancellation notice will document in the extra duty
book, the date and time the cancellation call was received, and they will initial next
to this entry.
2. The person will then notify the officer who had signed up for the extra duty
assignment.
a. This notification will be by leaving the officer a voice mail message stating the
particular extra duty assignment was canceled.
b. If the cancellation notice was received after normal working hours and the
assignment is for the next business day the person receiving the notification will
comply with the above steps but they will also attempt to contact the officer at
the officer’s residence.
3. The person’s initials next to the entry will signify that his person did in fact notify the
officer.
B. When an extra duty assignment is canceled for inclement weather the following
procedure will be followed:
1. The officer who has signed up for the extra duty assignment will be responsible for
contacting the On Duty Supervisor at least one (1) hour prior to the start of the extra
duty assignment. The On Duty Supervisor will make the determination if an extra
duty assignment will be canceled due to inclement weather at this time.
2. If extra duty assignments are going to be canceled due to inclement weather in
advance of the assignment, the officer making the decision to cancel the assignment
will ensure that the officers are notified in advance if possible. (ie: leaving the officer
a message at his residence if possible, if not then a voice mail message)
Paj 101
Revenue Policy – Police Extra Duty/Voluntary Overtime Page 5 of 10
3. Officers are required to check their voicemail one (1) hour prior to the scheduled start
time of all assignments unless notified previously.
C. A phone message will be left for the Extra Duty Coordinator advising of the cancellation
and that the officer(s) were in fact notified.
D. Some extra duty assignments will be canceled regularly due to inclement weather
where others such as grant-related extra duty assignments are generally not canceled
for inclement weather, unless such weather is severe. Officers are expected to be
prepared to adapt to existing weather conditions.
X. DISCONTINUATION OF SERVICE
If the Chief of Police or his designee or the Extra Duty Coordinator, determines that it is in
the best interest of the department to discontinue an extra duty service, the customer
employer will be immediately notified.
XI. BILLING POLICY
A. Billing rates for Fiscal Year 2015 are as indicated in Attachment 4.
B. Officers pay rates for extra duty assignments, regardless of type, are governed by the
Collective Bargaining Agreement.
C. The City of Dover will pay the officers wages as well as pay for worker’s compensation
and general liability insurance, administrative resource costs, automobile fuel,
maintenance and insurance. An overhead rate is added to the contractual Extra Duty
rate to cover these cost.
D. Officers working an extra-duty assignment will be paid a 3-hour minimum. If the
assignment is not canceled according to policy, or if the officer is released from the
assignment less than 3 hours from the start time, he/she will receive three (3) hours pay
at the extra duty rate.
E. If an officer is late to the assignment for any reason, the officer will be paid only for
actual hours worked.
F. Officers are held strictly accountable for their extra duty assignment worksheets, as this
is the source document by which officers are paid. The customer or designee must sign
the worksheet upon completion of the assignment. For large assignments, the
customer must sign the master worksheet that covers all the officers on that
assignment. Officers will be compensated for extra duty assignments during the pay
period in which the worksheet is submitted to payroll.
G. If an officer must work additional hours on an extra duty assignment, the customer is
responsible for payment of the additional costs, as long as the overage is due to the
extra duty assignment and is necessary.
H. At the conclusion of the extra duty assignment, the officer should place the assignment
worksheet in the payroll mailbox, but no later than the officer’s next scheduled workday.
Loss of an extra duty assignment worksheet may result in a delay of payment to the
officer, or may cause the officer to forfeit pay. Reproduction of assignment worksheets
Paj 102
Revenue Policy – Police Extra Duty/Voluntary Overtime Page 6 of 10
may be done with the approval of the Extra Duty Coordinator. The officer will have sole
responsibility for obtaining the proper signatures/dates/times. All employees working
extra duty are required to submit accurate assignment worksheets. The accuracy of
these assignment sheets is critical in ensuring appropriate employee compensation.
The employee’s signature must match the printed name of the employee assigned the
duty. The editing of extra duty worksheets by the employee is permitted for the
purpose of adding accurate information.
G. Any officer who falsifies any portion of the extra duty assignment worksheet will be
subject to discipline under General Order 26, Code of Conduct.
XII. WORKERS’ COMPENSATION/LIABILITY
The City of Dover is self- insured for general liability and statutory workers’
compensation coverage. Police officers assigned to extra duty work are afforded
workers compensation coverage.
XIII. EFFECTIVE DATE
This Procedure shall become effective upon adoption of City Council. Rates will be
reviewed on an annual basis and revised upon Council approval during the adoption of the
annual budget.
Paj 103
Revenue Policy – Police Extra Duty/Voluntary Overtime Page 7 of 10
Attachment 1
NOTICE TO CUSTOMERS
The officers are at all times subject to the policies and procedures of the City of Dover and
the rules and regulations governing employees of the Dover Police Department (DPD). A
customer has no authority over police personnel and is restricted to providing only a
general assignment of duties to be performed by the officer. Those duties never
supersede DPD policy or procedures and employers of the extra duty officers should so be
advised. Extra duty officers remain under the exclusive control of the department and
accountable for strict adherence to departmental rules and regulations. Any conflicting
rules of employers of extra duty officers will be disregarded. The officer shall refuse to
perform any duties deemed to be in conflict with the guidelines established by the Dover
Police Department. As determined by the Department, officers may be recalled from extra
duty to on-duty status.
This permit is for Law Enforcement work only and does not exempt customers from
obtaining other necessary permits for this event.
The City of Dover Police Department is NOT obligated to provide extra duty services. A
permit will not be issued to any person, firm, or organization whose offices, members,
business, or operations are questionable or for any event of a potentially compromising
nature.
Dover Police Department officers are NOT permitted to receive cash from customers for
any reason whatsoever.
The undersigned customer agrees, individually and on behalf of the named applicant, to
promptly pay for extra duty services rendered. Further, the undersigned agrees,
individually and on behalf of the named applicant to pay all costs, expenses and attorney’s
fees incurred in the collection of any sums due hereunder.
Paul M. Bernat.
Chief of Police
I have read and understand the “Extra Duty Conditions of Permit” and “Notice To
Customers”
________________________________________________________________
Customer-Individually and as Authorized Representative Date
_____________________________
Federal ID
Paj 104
Revenue Policy – Police Extra Duty/Voluntary Overtime Page 8 of 10
Attachment 2
DOVER POLICE DEPARTMENT
BILLING INFORMATION FORM
TO: DEPARTMENT OF FINANCE
FROM: Dover Police Department Date: 5/8/14
THIS SECTION TO PLEASE BILL AS FOLLOWS
BE COMPLETED BY
THE FINANCE
DEPARTMENT TYPE OF ACCOUNT CODE ACCOUNT NUMBER
VENDOR:
THIS WORK DONE ON:
LOCATION: As Requested
SECTION DESCRIPTION OF
WORK DONE: Police services
# HOURS:
TO BE
DETAIL OF CHARGES
LABOR:
COMPLETED
OVERHEAD:
VEHICLE: 0
BY THE
TOTAL BILL:
OPERATING MANUAL PAYMENT INTRUCTIONS: Take this invoice to the City of Dover Customer Services
Department located at 5 East Reed Street, Dover DE 19901. Only cash, money order or certified
funds payments will be accepted.
DEPARTMENT
AUTHORIZED
SIGNATURE
FINANCE DEPARTMENT
RECEIVED BY RECEIVED ON
KEYED BY VERIFIED BY
Paj 105
Revenue Policy – Police Extra Duty/Voluntary Overtime Page 9 of 10
Attachment 3
Dover Police Department Extra Duty Request Form
Type of Event:
Number of people attending:
Location of event:
Dates & Times Requested:
Billing Information:
Name:
Address:
Phone #’s: Cell # Work #
Contact person at the event:
Contact person cell #:
Person(s) requesting officer(s):
Signature of requesting person:
The responsible party will be charged a 3-hour minimum (per officer) if the assignment is
not canceled one (1) hour before the assigned start time. If the officer(s) are released
from the assignment less than three (3) hours from the start time, he/she will receive three
(3) hours pay. To cancel an assignment, dial (302) 736-7111.
Official use only, do not write below
Number of officers assigned:
Times officers assigned: to
Approved:
Return this form or fax it to: Special Enforcement Unit Commander.
Fax # (302) 672-1842, any additional questions, dial (302) 736-7145
Paj 106
Revenue Policy – Police Extra Duty/Voluntary Overtime Page 10 of 10
Attachment 4
City of Dover
Officer Extra Duty Billing Rates for Grant Related Events
Officer
Billing
Rank Rate
Patrolman $42.00
Patrolman 1st Class $51.00
Corporal $55.00
Master Corporal $65.00
Sergeant $72.00
Lieutenant $78.00
Captain $85.00
Officer Extra Duty Billing Rates for Office of Highway Safety Grants
Federal Approved Rate $50.00
City of Dover
Officer Extra Duty Billing Rates for Special Events (Spectator’s over 5,000)
Officer Total
Billing Overhead Hourly
Rank Rate Rate Rate
Special Event Rate $57.00 $2.00 $59.00
City of Dover
Officer Extra Duty Billing Rates for Non-Special Events
Officer Total
Billing Overhead Hourly
Rank Rate Rate Rate
Extra Duty Rate $57.00 $6.00 $63.00
Vehicles Actively Used on Extra Duty Jobs - Hourly Rate $ 16.25
Paj 107
SPONSOR: Sen. Lawson & Sen. Lavelle & Rep. D. Short
Sen. Simpson; Reps. Briggs King, Miro, Spiegelman
DELAWARE STATE SENATE
147th GENERAL ASSEMBLY
SENATE BILL NO. 226
AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO PUBLIC UTILITIES.
BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF DELAWARE:
1 Section 1. Amend Subchapter III-A, Chapter 1, Title 26 of the Delaware Code by making deletions as shown by
2 strike through and insertions as shown by underline as follows:
3 § 365. Customer billing.
4 (a) Each Commission-regulated electric company, retail electricity provider, or municipal electric company shall
5 include on each customer’s monthly bill the cost assessed to the customer for any of the following public purpose program
6 charges or nonbypassable charges:
7 (1) The Green Energy Fund charge, as established by § 1014(a) of this title;
8 (2) The Low-Income Home Energy Assistance Program (LIHEAP) charge, as established by § 1014(b) of this
9 title;
10 (3) The recovery of costs incurred by complying with a state mandated renewable energy portfolio standard,
11 as authorized by § 358(f) of this title and the Rules and Procedures to Implement the Renewable Energy Portfolio
12 Standard, CDR 26-3000-3008 § 3.2.3.2, related to procuring RECs and SRECs;
13 (4) The recovery of costs related to alternative compliance payments, as authorized by § 358(f)(2) of this title;
14 and
15 (5) The charges collected on behalf of a qualified fuel cell provider project, as authorized by § 364 of this title.
16 (b) The customer’s monthly bill shall reflect the cost assessed for the items in paragraph (3)(a)(1) through (5) of
17 this section in terms of total cost and cost per kilowatt hour. The customer’s final bill for each calendar year shall reflect
18 the cost assessed for the items in paragraph (3)(a)(1) through (5) of this section in terms of total cost for the calendar year.
Page 1 of 2
LC : MJC : RAY May 15, 2014
4801470116
Paj 108
19 Section 2. Amend § 358, Title 26 of the Delaware Code by making deletions as shown by strike through and
20 insertions as shown by underline as follows:
21 § 358. Issuance of renewable energy credits; reporting requirement; alternative compliance payment.
22 (f)(1) Recovery of costs — A retail electricity supplier or municipal electric company may recover, through a
23 nonbypassable surcharge, actual dollar for dollar costs incurred in complying with a state mandated renewable energy
24 portfolio standard, except that any compliance fee assessed pursuant to subsection (d) of this section shall be
25 recoverable only to the extent authorized by paragraph (f)(2) of this section.
26 (2) A retail electricity supplier or municipal electric company may recover any alternative compliance
27 payment if:
28 a. The payment of an alternative compliance payment is the least cost measure to ratepayers as compared
29 to the purchase of eligible energy resources to comply with a renewable energy portfolio standard; or
30 b. There are insufficient eligible energy resources available for the electric supplier to comply with a
31 renewable energy portfolio standard.
32 (3) Any cost recovered under this section shall be disclosed to customers at least annually on inserts accompanying
33 customer bills.
SYNOPSIS
Section 1 of this bill would increase consumer knowledge and corporate transparency by requiring a Commission-
regulated electric company, retail electricity provider, or municipal electric company to include on each customer’s bill a
line-by-line accounting of the amount of each bill, in total cost and cost per kilowatt hour, directed to:
(1) the Green Energy Fund;
(2) the Low-Income Home Energy Assistance Program
(3) the costs incurred by complying with the state mandated renewable energy portfolio standard related to
procuring RECs and SRECs;
(4) the costs related to alternative compliance payments related to the electric company’s decision to make
such payment in lieu of meeting the renewable energy portfolio standards contained in Subchapter III-A of Title 26;
and
(5) the charges collected on behalf of qualified fuel cell provider projects, such as Bloom Energy.
Section 2 of this bill would remove the current requirement that electric companies annually disclosure the costs
recovered under § 358 of Title 26 on inserts to customer bills as that requirement is incorporated into the changes made in
Section 1 of the bill.
Author: Sen. Lawson
Page 2 of 2
LC : MJC : RAY May 15, 2014
4801470116
Paj 109
City of Dover
2014/15 COMMITTEE APPOINTMENTS - COUNCIL PRESIDENT
1. LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE - This committee advises
the city council on proposed Charter amendments, ordinances to be adopted or amended, and other
legislative matters; financial matters, including the city's budget, assessments, and taxation and
administrative issues, policy, procedures, and operations of the city. The committee advises the city
council regarding matters relating to the mayor, council, city manager's office, finance department,
administrative services, city clerk's office, tax assessor's office, human resources department,
central services department, information technology department, election board, pension boards,
and any other departments, committees, and other areas as deemed appropriate. Consists of five
(5) members - three (3) elected City officials and two (2) City residents. Four (4) members shall be
appointed by the Council President and one (1) member shall be appointed by the Committee Chair.
A. David L. Anderson - Chair
B. William F. Hare
C. Timothy A. Slavin
D. Daniel T. Shevock (by Council President)
E. Roy Sudler, Jr. (by Committee Chair)
2. PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE - This committee
advises the city council on parks, playgrounds, open space, and other recreational facilities and
programs; matters relating to the community enhancements by reviewing and commenting on
community plans, and recommends appropriate funding for each community improvement project;
advises the city council on landscaping and beautification programs and tree preservation
requirements, and assists in developing an understanding of the objectives and methods of tree
conservation. The Committee advises city council regarding matters relating to the parks and
recreation department, planning department, grounds department, community development, Silver
Lake Commission, Greater Dover Arts Council, library commission, and other areas as deemed
appropriate, including funding. Consists of five (5) members - three (3) elected City officials and two
(2) City residents. Four (4) members shall be appointed by the Council President and one (1) member
shall be appointed by the Committee Chair.
A. Wallace R. Dixon - Chair
B. David L. Anderson
C. Adam M. Perza
D. Ann Baker Horsey (by Council President)
E. M. Milford Caldwell, Jr. (Appointed by Chairperson)
Paj 110
COUNCIL PRESIDENT APPOINTMENTS - 2014/2015 COMMITTEES PAGE 2
3. SAFETY ADVISORY AND TRANSPORTATION COMMITTEE - This committee advises the city
council on public safety issues, policies, procedures, and operations relative to emergency
operations, and fire and police services. The Committee shall act as an advisory committee to the
city council regarding matters relating to the police department, fire department, department of
inspections, and other areas as deemed appropriate. Consists of five (5) members - three (3) shall be
elected City officials and two (2) shall be City residents. Four (4) members shall be appointed by the
Council President and one (1) member shall be appointed by the Committee Chair.
A. James L. Hutchison, Sr. - Chair
B. Wallace R. Dixon
C. Adam M. Perza
D. David J. Truax (Effective July 3, 2014) (by Council President)
E. Thomas J. Keller, Jr. (by Committee Chair)
4. UTILITY COMMITTEE - This committee advises the city council on the installation, maintenance,
repair, improvement, and relocation of electric, water, sewer, streets, communication utilities and
other infrastructures within the city and lawfully extending beyond the city corporate limits; shall
advise the city council on the issue of utility consumption rates, suggested code amendments, and
condemnation of public rights-of-way; and shall act as an advisory committee to determine and
establish utility issues, policies, procedures, and operations relative to electric, water, sewer,
communications, etc., including, but not limited to, nonconsumption utility fees, utility extensions,
impact fees, and service connection fees. The Committee shall act as an advisory committee to the
city council regarding matters relating to the electric department, and public works department,
including water, sewer, and sanitation divisions, and other areas as deemed appropriate. Consists
of five (5) members - three (3) shall be elected City officials and two (2) shall be City residents. Four (4)
members shall be appointed by the Council President and one (1) member shall be appointed by the
Committee Chair.
A. Beverly C. Williams - Chair
B. Adam M. Perza
C. Timothy A. Slavin
D. Richard K. Snaman (by Council President)
E. Lester L. Blakeman, Sr. (by Committee Chair)
Paj 111
COUNCIL PRESIDENT APPOINTMENTS - 2014/2015 COMMITTEES PAGE 3
5. COMPENSATION COMMISSION - To consider compensation for the Mayor, City Council, and
paid members of City Committees and Commissions. The compensation commission shall consist of
five members, one (1) member appointed by the mayor, one (1) member appointed by the council
president, and three (3) members appointed by city council during the annual meeting. Members shall be
city residents who are registered to vote in city elections. Members shall serve two-year terms and cannot
be reappointed within the next two (2) years. The controller/treasurer and human resources director shall
serve as ex-officio, nonvoting members.
A. Vacant (by Council)
B. Vacant (by Council)
C. Vacant (by Council)
6. CONSTRUCTION CODE APPEALS COMMITTEE - This committee shall hear appeals by any
person aggrieved by a decision of the building inspector in respect to the provisions of Chapter 22 -
Buildings and Building Regulations (Plumbing, Mechanical, and Fire Prevention). Consists of three
(3) members - two (2) elected City officials and the City Manager.
A. Adam M. Perza - Chair
B. Sean M. Lynn
C. Scott D. Koenig - City Manager
7. OTHER POST-EMPLOYMENT BENEFITS (OPEB) TRUST FUND BOARD - This board shall
adopt a trust agreement for the OPEB fund (and may amend the trust agreement from time to
time), shall take all actions necessary and appropriate to establish and maintain the OPEB fund as
a trust that is exempt from taxation under Internal Revenue Code § 115 [26 U.S.C. § 115]. The trust
shall be maintained and administered by the board solely for the benefit of participants, retirees,
and beneficiaries by providing payments for retiree health insurance for medical care in compliance
with Internal Revenue Code § 105 [26 U.S.C. § 105] and with the Dover Code as presented and
verified by representatives and/or retiree health insurance service providers of the city. Consists
of five (5) members - the controller/treasurer, human resources director, city manager, and two (2) elected
city officials.
A. William F. Hare
B. Beverly C. Williams
Paj 112
COUNCIL PRESIDENT APPOINTMENTS - 2014/2015 COMMITTEES PAGE 4
8. RETIREMENT COMMITTEE - GENERAL EMPLOYEE PENSION PLAN - The duties of this
committee are to manage the city employees' pension plan. Consists of seven (7) members - two (2)
elected City officials, the City Manager, the City Controller/Treasurer and three (3) elected by eligible
employees, with three (3) year staggered terms with elections held in June.
A. David L. Anderson
B. Sean M. Lynn
9. RETIREMENT COMMITTEE - POLICE PENSION PLAN - This committee shall administer the
[retirement] plan and shall have the power and the duty to take all action and to make all decisions
necessary or proper to carry out the plan. Consists of seven (7) members - two (2) elected City
officials, the City Manager (Ex-Officio), Chief of Police (Ex-Officio), and three (3) elected by members
of the plan to three (3) year staggered terms, with elections held in January and presented to Council for
confirmation.
A. David L. Anderson
B. Sean M. Lynn
10. MISCELLANEOUS COMMITTEE APPOINTMENTS
A. Chamber of Commerce and Greater Dover Committee Liaison Members
a-1. William F. Hare
a-2. Beverly C. Williams
B. City/County Committee (Liaison to Kent County)
b-1. Mayor (Vacant)
b-2. David L. Bonar
b-3. William F. Hare
b-4. James L. Hutchison
b-5. Beverly C. Williams
b-6. Scott D. Koenig
C. Kent County Tourism
c-1. Wallace R. Dixon
c-2. William G. Neaton (Staff Liaison)
D. Central Delaware Economic Development Council (CDEDC) Liaison Member/Kent Economic
Partnership
d-1. William F. Hare
FORMS ANNLMTG.CP Prepared by: City Clerk's Office/tm
S:\ANNUAL MEETINGS\2014 Meeting\Annual Meeting-Council President.wpd
Paj 113
FIRST READING
CITY OF DOVER
PROPOSED ORDINANCE #2014-08
BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
COUNCIL MET:
That Appendix B – Zoning, Article 3 – District Regulations, Section 10 – Institutional and Office
Zone (IO) be amended by deleting it in its entirety and inserting in lieu thereof the following:
1 Section 10. Institutional and office zone (IO).
2 10.1 Uses permitted. In an institutional and office zone (IO), no building or premises shall
3 be used, and no building or part of a building shall be erected, which is arranged,
4 intended, or designed to be used, in whole or in part, for any purpose, except the
5 following:
6 (a) Business, professional, or governmental offices.
7 (b) Banks.
8 (c) Research, design, and development laboratories.
9 (d) Public and institutional uses including hospitals, medical clinics, libraries, police
10 stations, courthouses, transit centers, schools, colleges, universities, places of public
11 assembly, philanthropic and charitable institutions, parks, playgrounds, public indoor
12 recreation centers, athletic fields.
13 (e) Public utility rights-of-way and structures necessary to serve areas within the city.
14 (f) Day care centers, provided they are established in accordance with all applicable
15 state regulations pertaining to child care and provided that they are established and
16 maintained in accordance with article 5, section 14 of this ordinance.
17 (g) Emergency shelters and transitional housing.
18 10.2 Conditional uses. The following uses are permitted, conditional upon the approval of
19 the planning commission in accordance with the procedures and subject to the general
20 conditions set forth in article 10, section 1:
21 (a) Firearm ranges, prisons, and correctional facilities.
22 (b) Public incinerators.
23 (c) Hotels and restaurants.
24 10.3 Accessory uses. The following uses shall be permitted accessory to other permitted uses
25 on a lot.
26 (a) Clinics, cafeterias, and recreational facilities.
27 (b) Motor vehicle storage and repair facilities accessory to a public or institutional use.
28 (c) Restaurants that are on a campus and intended to support users of the campus.
29 10.4 Uses prohibited. The following uses are prohibited:
30 (a) Landfills, dumps.
Paj 114
PROPOSED ORDINANCE #2014-08 - AMENDING APPENDIX B-ZONING PAGE 2
31 10.5 Enclosed buildings. All permitted uses and all storage accessory thereto, other than off-
32 street parking, shall be carried on in buildings fully enclosed on all sides, except for
33 outdoor eating areas associated with restaurants and outdoor sales areas approved by the
34 city planner.
35 10.6 Performance standards. All uses are subject to performance standards as set forth in
36 article 5, section 8.1.
37 10.7 Site development plan approval. Site development plan approval in accordance with
38 article 10, section 2 hereof shall be required prior to the issuance of building permits for
39 the erection or enlargement of all structures and prior to the issuance of certificates of
40 occupancy for any change of use.
41 BE IT FURTHER ORDAINED:
42 That Appendix B – Zoning, Article 3 – District Regulations, Section 11 – Neighborhood
43 Commercial Zone (C-1) be amended by deleting it in its entirety and inserting in lieu thereof the
44 following:
45 Section 11. Neighborhood commercial zone (C-1).
46 11.1 Uses permitted. In a neighborhood commercial zone (C-1), no building or premises shall
47 be used, and no building or part of a building shall be erected, which is arranged,
48 intended, or designed to be used, in whole or in part, for any purpose, except the
49 following:
50 (a) Retail stores.
51 (b) Personal service establishments.
52 (c) Service establishments.
53 (d) Restaurants.
54 (e) One family residences, including attached and semi-detached dwellings, complying
55 with the bulk standards of the RG-1 (General Residence) zone.
56 (f) Apartments and multi-family dwellings.
57 11.2 Uses prohibited. The following uses are prohibited:
58 (a) Fuel pumps; motor vehicle storage, sales, or repairs.
59 (b) Drive-throughs.
60 (c) Liquor stores.
61 (d) Fire arm sales
62 (e) Tobacco shops.
63 11.3 Enclosed buildings. All permitted uses and all storage accessory thereto, other than off-
64 street parking, shall be carried on in buildings fully enclosed on all sides, except for
65 outdoor eating areas associated with restaurants and outdoor sales areas approved by the
66 city planner.
67 11.4 Floor area. The total floor area in any one establishment shall not exceed 2,500 square
68 feet.
Paj 115
PROPOSED ORDINANCE #2014-08 - AMENDING APPENDIX B-ZONING PAGE 3
69 11.5 Performance standards. All uses are subject to performance standards as set forth in
70 article 5, section 8.1.
71 11.6 Site development plan approval. Site development plan approval in accordance with
72 article 10, section 2 hereof shall be required prior to the issuance of building permits for
73 the erection or enlargement of all structures and prior to the issuance of certificates of
74 occupancy for any change of use.
75 BE IT FURTHER ORDAINED:
76 That Appendix B – Zoning, Article 3 – District Regulations, Section 12 – Limited Commercial Zone
77 (C-1A) be amended by deleting it in its entirety and inserting in lieu thereof the following:
78 Section 12. Limited commercial zone (C-1A)
79 12.1 Uses permitted. In a limited commercial zone (C-1A), no building or premises shall be
80 used, and no building or part of a building shall be erected, which is arranged, intended,
81 or designed to be used, in whole or in part, for any purpose, except the following:
82 (a) Retail stores.
83 (b) Personal service establishments.
84 (c) Service establishments.
85 (d) Restaurants.
86 (e) Business, professional, and governmental offices.
87 (f) One family residences, including attached and semi-detached dwellings, complying
88 with the bulk standards of the RG-1 (General Residence) zone.
89 (g) Apartments and multi-family dwellings.
90 12.2 Conditional uses. The following uses are permitted, conditional upon the approval of the
91 planning commission in accordance with the procedures and subject to the general
92 conditions set forth in article 10, section 1:
93 (a) Drive-throughs accessory to a permitted use.
94 12.3 Uses prohibited. The following uses are prohibited:
95 (a) Motor vehicle storage, sales, or repairs.
96 12.4 Enclosed buildings. All permitted uses and all storage accessory thereto, other than off-
97 street parking, shall be carried on in buildings fully enclosed on all sides, except for
98 outdoor eating areas associated with restaurants and outdoor sales areas approved by the
99 city planner.
100 12.5 Performance standards. All uses are subject to performance standards as set forth in
101 article 5, section 8.1.
102 12.6 Site development plan approval. Site development plan approval in accordance with
103 article 10, section 2 hereof shall be required prior to the issuance of building permits for
104 the erection or enlargement of all structures and prior to the issuance of certificates of
105 occupancy for any change of use.
Paj 116
PROPOSED ORDINANCE #2014-08 - AMENDING APPENDIX B-ZONING PAGE 4
106 BE IT FURTHER ORDAINED:
107 That Appendix B – Zoning, Article 3 – District Regulations, Section 13 – Central Commercial Zone
108 (C-2) be amended by deleting it in its entirety and inserting in lieu thereof the following:
109 Section 13. Central commercial zone (C-2).
110 13.1 Uses permitted. In a central commercial zone (C-2), no building or premises shall be
111 used, and no building or part of a building shall be erected, which is arranged, intended,
112 or designed to be used, in whole or in part, for any purpose, except the following:
113 (a) Retail stores.
114 (b) Restaurants.
115 (c) Hotels, including bed and breakfast inns.
116 (d) Art galleries and studios.
117 (e) Service establishments.
118 (f) Personal service establishments.
119 (g) Business, professional, and government offices.
120 (h) Apartments and multi-family dwellings, provided that no dwelling units shall be
121 permitted in the first floor on the street frontage of Loockerman Street.
122 13.2 Conditional uses. The following uses are permitted, conditional upon the approval of the
123 planning commission in accordance with the procedures and subject to the general
124 conditions set forth in article 10, section 1:
125 (a) Parking lots and parking structures as a principal use.
126 (b) Places of public assembly.
127 (c) Manufacturing, assembling, converting, altering, finishing, cleaning, or any other
128 processing of products where goods so produced or processed are to be sold at
129 retail exclusively on the premises, provided that:
130 (1) An area fully concealed from any street and equal to not more than 20
131 percent of the area devoted to retail sales shall be so used;
132 (2) Electrical power not to exceed a total of five rated horsepower, and steam
133 pressure not in excess of 60 pounds of pressure per square inch shall be used
134 exclusively;
135 (3) Not more than four (4) employees are engaged in such production or
136 processing.
137 13.3 Enclosed buildings. All permitted uses and all storage accessory thereto, other than off-
138 street parking, shall be carried on in buildings fully enclosed on all sides, except for
139 outdoor eating areas associated with restaurants and outdoor sales areas approved by the
140 city planner.
141 13.4 Performance standards. All uses are subject to performance standards as set forth in
142 article 5, section 8.1.
143 13.5 Site development plan approval. Site development plan approval in accordance with
144 article 10, section 2 hereof shall be required prior to the issuance of building permits for
145 the erection or enlargement of all structures and prior to the issuance of certificates of
146 occupancy for any change of use.
Paj 117
PROPOSED ORDINANCE #2014-08 - AMENDING APPENDIX B-ZONING PAGE 5
147 BE IT FURTHER ORDAINED:
148 That Appendix B – Zoning, Article 3 – District Regulations, Section 14 – Limited Central
149 Commercial Zone (C-2A) be amended by deleting it in its entirety and inserting in lieu thereof the
150 following:
151 Section 14. Limited central commercial zone (C-2A).
152 14.1 Uses permitted. In a limited central commercial zone (C-2A), no building or premises
153 shall be used, and no building or part of a building shall be erected, which is arranged,
154 intended, or designed to be used, in whole or in part, for any purpose, except the
155 following:
156 (a) Retail stores.
157 (b) Business, professional or governmental offices.
158 (c) Personal service establishments.
159 (d) Restaurants.
160 (e) Service establishments.
161 (f) Hotels.
162 (g) Places of public assembly.
163 (h) Drive-throughs.
164 (i) One (1) family residences, including attached and semi-detached dwellings,
165 complying with the bulk standards of the RG-1 (General Residence) zone.
166 (j) Apartments and multi-family dwellings.
167 14.2 Conditional uses. The following uses are permitted, conditional upon the approval of the
168 planning commission in accordance with the procedures and subject to the general
169 conditions set forth in article 10, section 1:
170 (a) Parking lots and parking structures as a principal use on suitably landscaped lots.
171 (b) Fuel pumps accessory to a permitted use.
172 14.3 Enclosed buildings. All permitted uses and all storage accessory thereto, other than off-
173 street parking, shall be carried on in buildings fully enclosed on all sides, except for
174 outdoor eating areas associated with restaurants and outdoor sales areas approved by the
175 city planner.
176 14.4 Performance standards. All uses are subject to performance standards as set forth in
177 article 5, section 8.1.
178 14.5 Site development plan approval. Site development plan approval in accordance with
179 article 10, section 2 hereof shall be required prior to the issuance of building permits for
180 the erection or enlargement of all structures and prior to the issuance of certificates of
181 occupancy for any change of use.
Paj 118
PROPOSED ORDINANCE #2014-08 - AMENDING APPENDIX B-ZONING PAGE 6
182 BE IT FURTHER ORDAINED:
183 That Appendix B – Zoning, Article 3 – District Regulations, Section 15 – Service Commercial Zone
184 (C-3) be amended by deleting it in its entirety and inserting in lieu thereof the following:
185 Section 15. Service commercial zone (C-3).
186 15.1 Uses permitted. In a service commercial zone (C-3), no building or premises shall be
187 used, and no building or part of a building shall be erected, which is arranged, intended,
188 or designed to be used, in whole or in part, for any purpose, except the following:
189 (a) Service establishments.
190 (b) Personal service establishments.
191 (c) Business, professional or governmental offices.
192 (d) Retail uses accessory to a permitted use.
193 (e) Drive-throughs accessory to a permitted use.
194 (f) Wholesale, storage, and warehousing establishments.
195 (g) Indoor recreation and amusement establishments.
196 (h) Motor vehicle, boat, or farm equipment sales or service, subject to the following
197 regulations:
198 (1) The minimum lot size for such establishments shall be 20,000 square feet,
199 and the minimum street frontage shall be 150 feet.
200 (2) Entrance and exit driveways shall have an unrestricted width of not less than
201 16 feet, shall be located not nearer than ten feet from any property line and
202 shall be so laid out as to avoid the necessity of any vehicle leaving the
203 property to back out across any public right-of-way or portion thereof.
204 (3) Vehicle lifts or pits, dismantled and disabled automobiles and all parts or
205 supplies shall be located within a building enclosed on all sides.
206 (4) All service or repair of motor vehicles, other than such minor servicing as
207 change of tires or sale of gasoline or oil, shall be conducted in a building
208 fully enclosed on all sides. This requirement shall not be construed to mean
209 that the doors to any repair shop must be kept closed at all times.
210 (5) The storage of gasoline or flammable oils in bulk shall be located fully
211 underground in accordance with applicable provisions of the National Fire
212 Protection Association Code.
213 (6) No fuel pumps shall be located nearer than 15 feet to any street line.
214 (7) Fuel pumps shall not be permitted closer than 100 feet from a property line
215 of any school, day care, church, hospital, nursing home, or place of public
216 assembly designed for the simultaneous use and occupancy by more than 100
217 persons.
218 (i) Manufacturing, assembling, converting, altering, finishing, cleaning or any other
219 processing of products for sale on or off the premises, provided that not more than
220 25 persons shall be engaged in such activity; and provided further, that any such
221 use shall be subject to the performance standards procedure as set forth in article 5,
222 section 8.
223 (j) Mini-storage facilities, subject to the following regulations:
224 (1) No unit shall be placed within 30 feet of a residential property line.
225 (2) No outside storage, except for recreational vehicles, boats, or personal
226 automobiles when parked in specifically approved locations. Parking for
227 these vehicles shall not count toward the required parking set forth in
Paj 119
PROPOSED ORDINANCE #2014-08 - AMENDING APPENDIX B-ZONING PAGE 7
228 subsection (e) below.
229 (3) No individual unit may be used for retail, garage sale or any other
230 commercial activities.
231 (4) No storage of flammable, explosive, corrosive or other hazardous products
232 may occur in the individual unit.
233 (5) Parking must be provided at a ratio of one (1) space for each 25 rental units,
234 plus a minimum of three (3) spaces for an office outside of the enclosure.
235 15.2 Conditional uses. The following uses are permitted, conditional upon the approval of the
236 planning commission in accordance with the procedures and subject to the general
237 conditions set forth in article 10, section 1:
238 (a) Crematory, subject to the following requirements:
239 (1) The building lot line upon which a crematory is to be established shall be
240 located at least 100 feet from any residential zone.
241 (2) Where adjacent to residential zones, all landscape buffers shall be required.
242 The buffer shall consist of a landscape screen no less than six and one half
243 (6½) feet high. All landscaping shall be properly maintained throughout the
244 life of the use on lot.
245 (3) Loading operations shall be conducted within a completely enclosed
246 building. Location of loading doors shall be at the side or rear of the building.
247 (4) The crematory shall comply with the Delaware Incinerator Regulations. A
248 copy of the approved air pollution permit issued by the State of Delaware
249 Department of Natural Resources and Environmental Control shall
250 accompany the application for a certificate of occupancy.
251 15.3 Enclosed buildings. All permitted uses and all storage accessory thereto, other than off-
252 street parking, shall be carried on in buildings fully enclosed on all sides, except for
253 outdoor eating areas associated with restaurants and outdoor sales areas approved by the
254 city planner.
255 15.4 Performance standards. All uses are subject to performance standards as set forth in
256 article 5, section 8.1.
257 15.5 Site development plan approval. Site development plan approval in accordance with
258 article 10, section 2 hereof shall be required prior to the issuance of building permits for
259 the erection or enlargement of all structures and prior to the issuance of certificates of
260 occupancy for any change of use.
261 BE IT FURTHER ORDAINED:
262 That Appendix B – Zoning, Article 3 – District Regulations, Section 16 – Highway Commercial
263 Zone (C-4) be amended by deleting it in its entirety and inserting in lieu thereof the following:
264 Section 16. Highway commercial zone (C-4).
265 16.1 Uses permitted. In a highway commercial zone (C-4), no building or premises shall be
266 used, and no building or part of a building shall be erected, which is arranged, intended,
267 or designed to be used, in whole or in part, for any purpose, except the following:
268 (a) Retail stores.
Paj 120
PROPOSED ORDINANCE #2014-08 - AMENDING APPENDIX B-ZONING PAGE 8
269 (b) Business, professional or governmental offices.
270 (c) Restaurants.
271 (d) Personal service establishments.
272 (e) Service establishments.
273 (f) Hotels and motels.
274 (g) Places of public assembly.
275 (h) Bus terminal.
276 (i) Wholesale, storage, warehousing, and distribution establishments.
277 (j) Indoor or outdoor recreation and amusement establishments.
278 (k) Hospitals and medical centers.
279 (l) Drive-throughs.
280 (m) Motor vehicle, boat, or farm equipment sales or service:
281 (1) The minimum lot size for such establishments shall be 20,000 square feet,
282 and the minimum street frontage shall be 150 feet.
283 (2) Entrance and exit driveways shall have an unrestricted width of not less than
284 16 feet, shall be located not nearer than ten feet from any property line and
285 shall be so laid out as to avoid the necessity of any vehicle leaving the
286 property to back out across any public right-of-way or portion thereof.
287 (3) Vehicle lifts or pits, dismantled and disabled automobiles, and all parts or
288 supplies shall be located within a building enclosed on all sides.
289 (4) All service or repair of motor vehicles, other than such minor servicing as
290 change of tires or sale of gasoline or oil, shall be conducted in a building
291 fully enclosed on all sides. This requirement shall not be construed to mean
292 that the doors to any repair shop must be kept closed at all times.
293 (5) The storage of gasoline or flammable oils in bulk shall be located fully
294 underground in accordance with applicable provisions of the National Fire
295 Protection Association Code.
296 (6) No fuel pumps shall be located nearer than 15 feet to any street line.
297 (7) Fuel pumps shall not be permitted closer than 100 feet from a property line
298 of any school, day care, church, hospital, nursing home, or place of public
299 assembly designed for the simultaneous use and occupancy by more than 100
300 persons.
301 (n) Manufacturing, assembling, converting, altering, finishing, cleaning, or any other
302 processing of products for sale on or off the premises, provided that not more than
303 25 persons shall be engaged in such activity; and provided further, that any such
304 use shall be subject to the performance standards procedure as set forth in article 5,
305 section 8.
306 (o) Mini-storage facilities, subject to the following regulations:
307 (1) No unit shall be placed within 30 feet of a residential property line.
308 (2) No outside storage, except for recreational vehicles, boats, or personal
309 automobiles when completely parked in specifically approved locations.
310 Parking for these vehicles shall not count toward the required parking set
311 forth in subsection (e) below.
312 (3) No individual unit may be used for retail, garage sale, or any other
313 commercial activities.
314 (4) No storage of flammable, explosive, corrosive, or other hazardous products
315 may occur in the individual unit.
316 (5) Parking must be provided at a ratio of one (1) space for each 25 rental units,
317 plus a minimum of three (3) spaces for an office
Paj 121
PROPOSED ORDINANCE #2014-08 - AMENDING APPENDIX B-ZONING PAGE 9
318 (p) Adult entertainment establishments, subject to the provisions stated in article 5,
319 section 13.
320 16.2 Conditional uses. The following uses are permitted, conditional upon the approval of the
321 planning commission in accordance with the procedures and subject to the general
322 conditions set forth in article 10, section 1:
323 (a) Apartments and multi-family dwellings.
324 (b) Crematory, subject to the following requirements:
325 (1) The building lot line upon which a crematory is to be established shall be
326 located at least 100 feet from any residential zone.
327 (2) Where adjacent to residential zones, all landscape buffers shall be required.
328 The buffer shall consist of a landscape screen no less than six and one half
329 (6½) feet high. All landscaping shall be properly maintained throughout the
330 life of the use on lot.
331 (3) Loading operations shall be conducted within a completely enclosed
332 building. Location of loading doors shall be at the side or rear of the building.
333 (4) The crematory shall comply with the Delaware Incinerator Regulations. A
334 copy of the approved air pollution permit issued by the State of Delaware
335 Department of Natural Resources and Environmental Control shall
336 accompany the application for a certificate of occupancy.
337 16.3 Enclosed buildings. All permitted uses and all storage accessory thereto, other than off-
338 street parking, shall be carried on in buildings fully enclosed on all sides, except for
339 outdoor eating areas associated with restaurants and outdoor sales areas approved by the
340 city planner.
341 16.4 Performance standards. All uses are subject to performance standards as set forth in
342 article 5, section 8.1.
343 16.5 Site development plan approval. Site development plan approval in accordance with
344 article 10, section 2 hereof shall be required prior to the issuance of building permits for
345 the erection or enlargement of all structures and prior to the issuance of certificates of
346 occupancy for any change of use.
347 BE IT FURTHER ORDAINED:
348 That Appendix B – Zoning, Article 3 – District Regulations, Section 26 – Commercial/Professional
349 Office Development District be amended by deleting it in its entirety and inserting in lieu thereof
350 the following:
351 Section 26. Commercial and professional office zone (C-PO).
352 26.1 Uses permitted. In a commercial and professional office zone (C-PO), no building or
353 premises shall be used, and no building or part of a building shall be erected, which is
354 arranged, intended, or designed to be used, in whole or in part, for any purpose, except
355 the following:
356 (a) Business, professional or governmental offices.
357 (b) Banks.
358 (c) Medical laboratories.
Paj 122
PROPOSED ORDINANCE #2014-08 - AMENDING APPENDIX B-ZONING PAGE 10
359 (d) Drive-in facilities accessory to any permitted use.
360
361 26.2 Conditional uses. The following uses are permitted, conditional upon the approval of the
362 planning commission in accordance with the procedures and subject to the general
363 conditions set forth in article 10, section 1:
364 (a) Conditional uses accessory to permitted uses on the same lot:
365 (1) Cafeteria.
366 (2) Restaurant.
367 (3) Barbershop/beauty shop.
368 (4) Copy center.
369 (5) Office supply.
370 (6) Retail store.
371 (7) Newsstand.
372 (8) Spa and health club.
373 (9) Associated laboratories (other than those affiliated with permitted medical
374 uses).
375 (b) Residential uses as follows:
376 (1) Apartments and multifamily residences, provided at least two off-street
377 parking spaces shall be provided in the area for each unit.
378 (2) One (1) family residences subject to the requirements of the RG-1 (General
379 Residence) zone.
380 26.3 Enclosed buildings. All permitted uses and all storage accessory thereto, other than off-
381 street parking, shall be carried on in buildings fully enclosed on all sides, except for
382 outdoor eating areas associated with restaurants and outdoor sales areas approved by the
383 city planner.
384 26.4 Performance standards. All uses are subject to performance standards as set forth in
385 article 5, section 8.1.
386 26.5 Site development plan approval. Site development plan approval in accordance with
387 article 10, section 2 hereof shall be required prior to the issuance of building permits for
388 the erection or enlargement of all structures and prior to the issuance of certificates of
389 occupancy for any change of use.
390 BE IT FURTHER ORDAINED:
391 That Appendix B – Zoning, Article 4 – Zoning Bulk and Parking Regulations, Sections 4.14 and
392 4.15 be amended by deleting the text shown in red bold strikethrough and inserting the text shown
393 in blue bold italics as follows:
394 Section 4.14. [C-1, C-1A, C-2, C-2A zones.]
395 Bulk and parking regulations for neighborhood commercial (C-1), limited commercial (C-1A),
396 central commercial (C-2), and limited commercial (C-2A) zones are as follows:
Paj 123
PROPOSED ORDINANCE #2014-08 - AMENDING APPENDIX B-ZONING PAGE 11
C-1 C-1A C-2 C-2A
397 Minimum required:
Lot area (sq. ft.) 2,500
Lot width (ft.) 35 100 25 0 50
Lot depth (ft.) 100 75 70 100
Front yard (ft.) 25 25 0 15
Side yard (ft.) None required, but 15 None Same as C-1 None Same as C-1
10 5 feet min. if required, but required, but 5 feet min. if None required,
provided 5 feet min. if provided but 5 feet min. if
provided provided
Rear yard (ft.) 20 15 15 20 above ground floor. At Same as C-2
ground floor, 5 ft. required
Side or rear yards which adjoin a 25 15 2515 25 15 25
residential zone (ft.)
Off-street parking
Per 300 sq. ft. floor area or 2 1½ ½ for new construction 1
Per employee (whichever is 0 1 0 1
greater)
398 Maximum permitted:
Building height
Stories 2 2 6 6
Feet 30 30 60 75 60 75
Floor area ratio 0.5 1.0 0.35 1.5 4.0 4.0
399 Section 4.15. [C-3, C-4, R-C, IO zones.]
400 Bulk and parking regulations for service commercial (C-3), highway commercial (C-4), recreation
401 and commercial (RC), and institutional and office (IO), and commercial and professional office
402 (C-PO) zones are as follows:
C-3 C-4 RC IO C-PO
403 Minimum required:
Lot area 5 acres 10,000 sq. 5,000 sq. ft.
ft.
Lot width (ft.) 100 150 per 250 50 100 50
building
Lot depth (ft.) 100 150 400 100 100
Front yard (ft.) 25 20 30 20 30 20 10 10
Side yard (ft.) 20 15 25 15 50 10 5
Rear yard (ft.) 10 10 or equal 50 15 or equal 15
to bldg. to bldg.
height height
Side or rear yards which adjoin a residence 30 30 100 30 25
zone (ft.)
Off-street parking
Per 300 sq. ft. floor area or 1 1½ 1 1 1
Per employee (whichever is greater) 1 1 1
404 Maximum permitted:
Building height
Stories 26 46 10 10 3
Feet 30 75 45 75 130 130 150 45
Floor area ratio 0.5 4.0 2.0 4.0 4.0 4.0 6.0 2.0
Lot coverage 0.5 2.0 4.0 4.0
Lot coverage 85% 75%
Paj 124
PROPOSED ORDINANCE #2014-08 - AMENDING APPENDIX B-ZONING PAGE 12
405 BE IT FURTHER ORDAINED:
406 That Appendix B – Zoning, Article 10 – Planning Commission, Section 2 - Site Development Plan
407 Approval, be amended by deleting the text shown in red bold strikethrough and inserting the text
408 shown in blue bold italics as follows:
409 Section 2. - Site development plan approval.
410 2.1 Required. Site development plan approval shall be required for the erection or
411 enlargement of all structures and the establishment of any use for which site
412 development plan approval is required by this ordinance. Site development plan shall be
413 required according to the following criteria:
414 2.11 Planning commission site plan review. Site development plans shall be subject to
415 review and approval by the planning commission if they meet the following
416 thresholds:
417 (a) Site plans for new structures of 5,000 square feet or greater in floor area
418 and building additions of 3,000 5,000 square feet or greater in floor area or
419 greater than 15 percent of existing floor area, whichever is greater; or
420 (b) Site plans with a total of 5,000 square feet or greater of new or added
421 impervious surface, including new structures or building additions; or
422 (c) Nonresidential site plans with site disturbance greater than 2,500 1,500
423 square feet and adjacent to residential uses or residential zones.
424 2.12 Site development master plan. Site development master plans shall be subject to review
425 and approval by the planning commission in accordance with subsection 2.44.
426
427 2.13 Zoning review. For site development plans involving construction of a single-family
428 detached, single-family attached, or single-family semidetached dwelling; an accessory
429 structure; or a nonresidential change of use for which no building addition or increase
430 in impervious cover is proposed, the city planner or his designee may approve the site
431 development plan in conjunction with building permit review.
432 2.14 Administrative site plan. All site development plans that do not meet the thresholds for
433 zoning review in accordance with subsection 2.13 or planning commission site plan
434 review in accordance with subsection 2.11 shall be reviewed as administrative site
435 development plans.
436 BE IT FURTHER ORDAINED:
437 That Appendix B – Zoning, Article 12 – Definitions be amended by adding the following definitions
438 in the appropriate alphabetical order:
439 Apartment: A dwelling unit, within a building with other uses and/or dwelling units, that is
440 intended for use as a residence by an individual or a single family.
441 Dwelling, multi-family: (see “dwelling, multiple” - A building, or portion thereof, containing more
442 than two dwelling units)
Paj 125
PROPOSED ORDINANCE #2014-08 - AMENDING APPENDIX B-ZONING PAGE 13
443 Emergency shelter: A facility providing temporary housing to homeless or transient persons in
444 a dormitory style setting; such facility may also provide or facilitate other social services including
445 counseling and vocational training.
446 Personal Service Establishment: Establishments primarily engaged in providing individual
447 services generally related to personal needs, such as a hair salon.
448 Place of Public Assembly: Establishments where the principal use is for the gathering of persons
449 for activities such as civic, social, or religious functions, including but not limited to night clubs,
450 theaters, civic halls, and places of worship.
451 Retail: The selling of goods, wares, or merchandise directly to the ultimate consumer or persons
452 without a resale license.
453 Restaurant: An establishment in which the principal use is preparation and sale of food and
454 beverages.
455 Service Establishment: Any establishment whose primary activity is the provision of assistance,
456 as opposed to products, to individuals, business, industry, government, and other enterprises.
457 Transitional housing: A residential facility developed in a one-family dwelling unit that is
458 established to provide transition from homelessness to permanent housing, and generally integrated
459 with other social services and counseling programs to assist in the transition to self-sufficiency
460 through acquisition of stable income and permanent housing.
461 Vocational Training: A specialized instructional establishment that provides on-site training of
462 business, commercial, and/or trade skills. Incidental instructional services in conjunction with
463 another primary use shall not be considered vocational training.
464 ADOPTED: *
465 (SPONSORS: HARE, BONAR)
466 Actions History
467 May 27, 2014 - Scheduled for First Reading at Council
468 May 12, 2014 - Considered by Parks, Recreation, and Community Enhancement Committee
469 April 14, 2014 - Deferred by the Parks, Recreation, and Community Enhancement Committee
Paj 126
1 FIRST READING
2
3 CITY OF DOVER PROPOSED ORDINANCE #2014-09
4
5 WHEREAS, the City of Dover, Delaware has the authority to adopt regulations designed to promote the
6 public health, safety, and general welfare of its citizenry; and
7
8 WHEREAS, the Federal Emergency Management Agency has identified special flood hazard areas
9 within the boundaries of the City of Dover and such areas may be subject to periodic inundation which may
10 result in loss of life and property, health and safety hazards, disruption of commerce and governmental services,
11 extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all of which
12 adversely affect the public health, safety and general welfare, and
13
14 WHEREAS, the City of Dover was accepted for participation in the National Flood Insurance Program
15 on September 16, 1982 and the City of Dover desires to continue to meet the requirements of Title 44 Code of
16 Federal Regulations, Sections 59 and 60, necessary for such participation; and
17
18 WHEREAS, the City of Dover has, in Chapter 22 – Buildings and Building Regulations, of the Dover
19 Code of Ordinances adopted a building code that contains provisions for the design and construction of
20 buildings, structures, and dwellings in flood hazard areas; and
21
22 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF
23 DOVER, IN COUNCIL MET:
24
25 That Chapter 50 – Floods, of the Dover Code of Ordinances, be amended by deleting it in its entirety and
26 inserting in lieu thereof the following:
27
28 Chapter 50 FLOODS
29
30 ARTICLE I – IN GENERAL
31
32 Sec. 50-1. Findings.
33 The Federal Emergency Management Agency (FEMA) has identified special flood hazard areas within the
34 boundaries of the City of Dover, Delaware. Special flood hazard areas are subject to periodic inundation which
35 may result in loss of life and property, health and safety hazards, disruption of commerce and governmental
36 services, extraordinary public expenditures for flood protection and relief, and impairment of the tax base, all of
37 which adversely affect the public health, safety and general welfare. Development that is inadequately
38 elevated, improperly floodproofed, or otherwise unprotected from flood damage also contribute to the flood
39 loss.
40
41 The City of Dover agreed to meet the requirements of the National Flood Insurance Program and was
42 accepted for participation in the program on September 16, 1982. As of that date or the initial effective date of
43 the City of Dover Flood Insurance Rate Map, all development and new construction as defined herein, are to be
44 compliant with these regulations and the flood load and flood-resistant construction provisions of the building
45 code.
46
47 Sec. 50-2. Statement of purpose.
48 It is the purpose of these regulations to promote the public health, safety and general welfare, and to:
49 (A) Protect human life, health and welfare;
Page 1
Paj 127
50 (B) Encourage the utilization of appropriate construction practices in order to prevent or minimize
51 flood damage in the future;
52 (C) Minimize flooding of water supply and sanitary sewage disposal systems;
53 (D) Maintain natural drainage;
54 (E) Reduce financial burdens imposed on the community, its governmental units and its residents, by
55 discouraging unwise design and construction of development in areas subject to flooding;
56 (F) Minimize the need for rescue and relief efforts associated with flooding and generally
57 undertaken at the expense of the general public;
58 (G) Minimize prolonged business interruptions;
59 (H) Minimize damage to public facilities and other utilities such as water and gas mains, electric,
60 telephone and sewer lines, streets and bridges;
61 (I) Reinforce that those who build in and occupy special flood hazard areas should assume
62 responsibility for their actions;
63 (J) Minimize the impact of development on adjacent properties within and near flood prone areas;
64 (K) Provide that the flood storage and conveyance functions of the floodplain are maintained;
65 (L) Minimize the impact of development on the natural and beneficial functions of the floodplain;
66 (M) Prevent floodplain uses that are either hazardous or environmentally incompatible; and
67 (N) Meet community participation requirements of the National Flood Insurance Program as set forth
68 in the Code of Federal Regulations at 44 C.F.R. Section 59.22.
69
70 Sec. 50-3. Areas to which these regulations apply.
71 These regulations shall apply to all special flood hazard areas within the jurisdiction of the City of Dover,
72 as identified in Section 1.4.
73
74 Sec. 50-4. Basis for establishing special flood hazard areas.
75 For the purposes of these regulations, and for the purpose of establishing flood hazard areas in the
76 building code [Section 1612.3 and Table R301.2(1)], the following are adopted by reference as a part of these
77 regulations and serve as the basis for establishing special flood hazard areas:
78 (A) The FEMA Flood Insurance Study for Kent County , Delaware and Incorporated Areas dated
79 July 7, 2014 and all subsequent amendments and/or the most recent revision thereof.
80 (B) The FEMA Flood Insurance Rate Map for Kent County , Delaware and Incorporated Areas dated
81 July 7, 2014 , and all subsequent amendments and/or the most recent revision thereof.
82 (C) Other hydrologic and hydraulic engineering studies and/or maps prepared pursuant to these
83 regulations or for other purposes, and which establish base flood elevations, delineate 100-year
84 floodplains, floodways or other areas of special flood hazard.
85 (D) The City of Dover may identify and regulate new local flood hazard or ponding areas. These
86 areas should be delineated and adopted on a “Local Flood Hazard Map” using best available
87 topographic data and locally derived information such as flood of record, historic high water
88 marks or approximate study methodologies.
89 (E) Where field surveyed topography indicates that ground elevations are below the closest
90 applicable base flood elevation, even in areas not delineated as a special flood hazard area on a
91 flood hazard map, the area shall be considered as special flood hazard area.
92
Page 2
Paj 128
93 Maps and studies that establish special flood hazard areas are on file at the City of Dover Department of
94 Planning and Inspections.
95
96 Sec. 50-5. Abrogation and greater restrictions.
97 These regulations are not intended to repeal or abrogate any existing ordinances including subdivision
98 regulations, zoning ordinances or building codes. In the event of a conflict between these regulations and any
99 other ordinance, the more restrictive shall govern. These regulations shall not impair any deed restriction,
100 covenant or easement, but the land subject to such interests shall also be governed by these regulations.
101
102 Sec. 50-6. Interpretation.
103 In the interpretation and application of these regulations, all provisions shall be:
104 (A) Considered as minimum requirements;
105 (B) Liberally construed in favor of the governing body;
106 (C) Deemed neither to limit nor repeal any other powers granted under state statutes; and
107 (D) Where a provision of these regulations may be in conflict with a state or Federal law, such state
108 or Federal law shall take precedence , where more restrictive.
109
110 Sec. 50-7. Warning and disclaimer of liability.
111 The degree of flood protection required by these regulations is considered reasonable for regulatory
112 purposes and is based on scientific and engineering considerations. Larger floods can and will occur on rare
113 occasions. Flood heights may be increased by man-made or natural causes. These regulations do not imply that
114 land outside of the special flood hazard areas or uses that are permitted within such areas will be free from
115 flooding or flood damage. These regulations shall not create liability on the part of the City of Dover , any
116 officer or employee thereof, or the Federal Emergency Management Agency, for any flood damage that results
117 from reliance on these regulations or any administrative decision lawfully made thereunder.
118
119 50-8. Severability.
120 Should any section or provision of these regulations be declared by the courts to be unconstitutional or
121 invalid, such decision shall not affect the validity of the regulations as a whole, or any part thereof other than
122 the part so declared to be unconstitutional or invalid.
123
124 Secs. 50-9—50-19. Reserved.
125
126 ARTICLE II. ADMINISTRATION
127
128 50-20. Designation of the floodplain administrator.
129 The city planner is hereby appointed to administer and implement these regulations and is referred to
130 herein as the floodplain administrator. The floodplain administrator is authorized to: (A) Fulfill the duties and
131 responsibilities set forth in these regulations, (B) Delegate duties and responsibilities set forth in these
132 regulations to qualified technical personnel, plan examiners, inspectors, and other employees, or (C) Enter into
133 a written agreement or written contract with another jurisdiction or agency, or private sector entity to administer
134 specific provisions of these regulations, upon receiving necessary approvals. Administration of any part of these
135 regulations by another entity shall not relieve the community of its responsibilities pursuant to the participation
136 requirements of the National Flood Insurance Program as set forth in the Code of Federal Regulations at 44
137 C.F.R. Section 59.22.
138
Page 3
Paj 129
139 50-21. Duties and responsibilities of the floodplain administrator.
140 The duties and responsibilities of the floodplain administrator shall include but are not limited to:
141 (A) Coordinate with the building official to support administration, interpretation, and enforcement
142 of the flood load and flood-resistant construction provisions of the building code.
143 (B) Review applications for permits to determine whether proposed activities will be located in
144 special flood hazard areas.
145 (C) Interpret floodplain boundaries and provide flood elevation and flood hazard information.
146 (D) Review applications to determine whether proposed activities will be reasonably safe from
147 flooding.
148 (E) Review applications to determine whether all necessary permits have been obtained from those
149 Federal, state or local agencies from which prior or concurrent approval is required.
150 (F) Verify that applicants proposing to alter or relocate a watercourse have notified adjacent
151 communities and the Delaware Department of Natural Resources and Environmental Control
152 (Division of Watershed Stewardship), and have submitted copies of such notifications to the
153 Federal Emergency Management Agency.
154 (G) Issue permits to develop in special flood hazard areas when the provisions of these regulations
155 have been met, or disapprove the same in the event of noncompliance.
156 (H) Inspect special flood hazard areas to determine compliance with these regulations or to
157 determine if noncompliance has occurred or violations have been committed.
158 (I) Review submitted Elevation Certificates for completeness.
159 (J) Submit to FEMA data and information necessary to maintain flood hazard maps, including
160 hydrologic and hydraulic engineering analyses prepared by or for the City of Dover , corrections
161 to labeling or planimetric details, etc.
162 (K) Maintain and permanently keep all records for public inspection that are necessary for the
163 administration of these regulations including Flood Insurance Rate Maps, Letters of Map
164 Amendment and Revision, records of issuance and denial of permits, determinations of whether
165 development is in or out of special flood hazard areas for the purpose of issuing permits,
166 elevation certificates, other required certifications, variances, and records of enforcement actions
167 taken for violations of these regulations.
168 (L) Enforce the provisions of these regulations.
169 (M) Assist with and coordinate flood hazard map maintenance activities.
170 (N) Conduct, with the building official, determinations as to whether existing buildings and
171 structures damaged by any cause and located in special flood hazard areas, have been
172 substantially damaged.
173 (O) Make reasonable efforts to notify owners of substantially damaged buildings and structures of
174 the need to obtain a permit prior to repair, rehabilitation, or reconstruction, and to prohibit the
175 non-compliant repair of substantially-damaged buildings except for temporary emergency
176 protective measures necessary to secure a property or stabilize a structure to prevent additional
177 damage.
178 (P) Undertake, as determined appropriate by the floodplain administrator due to the circumstances,
179 other actions which may include but are not limited to: issuing press releases, public service
180 announcements, and other public information materials related to permit requests and repair of
181 damaged structures; coordinating with other Federal, state, and local agencies to assist with
Page 4
Paj 130
182 substantial damage determinations; providing owners of damaged structures materials and other
183 information related to the proper repair of damaged structures in special flood hazard areas; and
184 assisting owners with National Flood Insurance Program claims for Increased Cost of
185 Compliance payments.
186 (Q) Notify the Federal Emergency Management Agency when the corporate boundaries of the City
187 of Dover have been modified.
188
189 50-22. Permits required.
190 It shall be unlawful for any person or entity to begin construction or other development which is wholly
191 within, partially within, or in contact with any identified special flood hazard area, as established in Section 1.4,
192 including but not limited to: subdivision of land, filling, grading, or other site improvements and utility
193 installations; placement or replacement of a manufactured home; recreational vehicles; installation or
194 replacement of storage tanks; or alteration of any watercourse, until a permit is obtained from the City of Dover.
195 These regulations are intended to be administered and enforced in conjunction with the building code. No
196 permit shall be issued until the requirements of these regulations and, as applicable, the flood load and flood-
197 resistant construction provisions of the building code, have been met. Permit fees shall be as provided for in
198 Appendix F – Fees and Fines.
199
200 50-23. Application required.
201 Application for a permit shall be made by the owner of the property or his/her authorized agent, herein
202 referred to as the applicant, prior to the actual start of construction. The application shall be on a form furnished
203 for that purpose. For applications for buildings and structures, these required minimum contents of the
204 application are in addition to the requirements of the building code.
205
206 (A) Application contents.
207 At a minimum, applications shall include:
208 (1) Site plans drawn to scale showing the nature, location, dimensions, existing and proposed
209 topography of the area in question, the limits of any portion of the site that was
210 previously filled, and the location of existing and proposed structures, excavation, filling,
211 storage of materials, drainage facilities, and other proposed activities.
212 (2) Elevation of the existing natural ground where structures are proposed, referenced to the
213 datum on the Flood Insurance Rate Map, and an Elevation Certificate that shows the
214 ground elevation and proposed building elevations (identified in Section C of the
215 Elevation Certificate as “Construction Drawings”).
216 (3) Delineation of special flood hazard areas, floodway boundaries, flood zones, and base
217 flood elevations. Where surveyed natural ground elevations are lower than the base flood
218 elevations, base flood elevations shall be used to delineate the boundary of special flood
219 hazard areas. If proposed, changes in the delineation of special flood hazard areas shall
220 be submitted to and approved by FEMA in accordance with Section 3.4(B). Where
221 special flood hazard areas are not delineated or base flood elevations are not shown on
222 the flood hazard maps, the floodplain administrator has the authority to require the
223 applicant to use information provided by the floodplain administrator, information that is
224 available from other sources, or to determine such information using accepted
225 engineering practices.
226 (4) For subdivision proposals and development proposals containing at least 50 lots or at
227 least 5 acres, whichever is the lesser, and where base flood elevations are not shown on
228 Flood Insurance Rate Maps, hydrologic and hydraulic engineering analyses and studies as
Page 5
Paj 131
229 required by Section 4.2(D).
230 (5) Elevation of the lowest floor, including basement, or elevation of the bottom of the
231 lowest horizontal structural member, as applicable to the flood zone, of all proposed
232 structures, referenced to the datum on the Flood Insurance Rate Maps.
233 (6) Such other material and information as may be requested by the Floodplain Administrator
234 necessary to determine conformance with these regulations.
235 (7) For work on an existing structure, including any improvement, addition, repairs,
236 alterations, rehabilitation, or reconstruction, sufficient information to determine if the
237 work constitutes substantial improvement, including:
238 (a) Documentation of the market value of the structure before the improvement is
239 started or before the damage occurred.
240 (b) Documentation of the actual cash value of all proposed improvement work, or the
241 actual cash value of all work necessary to repair and restore damage to the before
242 damaged condition, regardless of the amount of work that will be performed.
243 (8) Certifications and/or technical analyses prepared or conducted by an appropriate design
244 professional licensed in the State of Delaware, as appropriate to the type of development
245 activity proposed and required by these regulations and the building code:
246 (a) Floodproofing Certificate for dry floodproofed non-residential structures, as
247 required by the building code.
248 (b) Certification that flood openings that do not meet the minimum requirements for
249 non-engineered openings but designed to automatically equalize hydrostatic flood
250 forces, as required by the building code.
251 (9) Technical analyses to document that the flood carrying capacity of any watercourse
252 alteration or relocation will not be diminished and documentation of maintenance
253 assurances as required in Section 4.11(C).
254 (a) Hydrologic and hydraulic engineering analyses demonstrating that the cumulative
255 effect of proposed development, when combined with all other existing and
256 anticipated development will not increase the water surface elevation of the base
257 flood by more than one foot in special flood hazard areas where the Federal
258 Emergency Management Agency has provided base flood elevations but has not
259 delineated a floodway, as required by Section 4.11(B).
260 (b) Hydrologic and hydraulic engineering analyses of any development proposed to
261 be located in an identified floodway, as required by Section 4.11(A).
262 (c) Hydrologic and hydraulic engineering analyses to develop base flood elevations
263 for subdivisions and large-lot developments, as required by Section 4.2(D) or
264 otherwise required by the floodplain administrator.
265
266 (B) Right to submit new technical data.
267 The applicant has the right to seek a Letter of Map Change and to submit new technical data to
268 FEMA regarding base maps, topography, special flood hazard area boundaries, floodway boundaries,
269 and base flood elevations. Such submissions shall be prepared in a format acceptable by FEMA and the
270 floodplain administrator shall be notified of such submittal. Submittal requirements and processing fees
271 shall be the responsibility of the applicant.
272
273
Page 6
Paj 132
274 (C) Requirement to submit new technical data.
275
276 The Floodplain Administrator shall notify FEMA of physical changes affecting flood hazard areas
277 and flooding conditions by submitting technical or scientific data as soon as practicable, but not later
278 than six (6) months after the date such information becomes available. The Floodplain Administrator
279 has the authority to require applicants to submit technical data to FEMA for Letters of Map Change.
280
281 50-24. Review, approval or disapproval.
282 (A) Review.
283 The floodplain administrator shall:
284 (1) Review applications for development in special flood hazard areas to determine the
285 completeness of information submitted. The applicant shall be notified of
286 incompleteness or additional information required to support the application.
287 (2) Review applications for compliance with these regulations after all information required
288 in Section 3.4 or identified and required by the floodplain administrator has been
289 received.
290 (3) Review all permit applications to assure that all necessary permits have been received
291 from those federal, state or local governmental agencies from which prior approval is
292 required. The applicant shall be responsible for obtaining such permits, including but not
293 limited to:
294 (a) Permits issued by the U.S. Army Corps of Engineers under Section 10 of the
295 Rivers and Harbors Act and Section 404 of the Clean Water Act, and the
296 Delaware Environmental Protection Agency under Section 401 of the Clean
297 Water Act.
298 (b) Permits required by the State of Delaware.
299 (4) Permit fees shall be as provided for in Appendix F – Fees and Fines.
300
301 (B) Approval or disapproval.
302
303 The floodplain administrator shall approve applications that comply with the applicable
304 requirements of these regulations. The Floodplain administrator shall disapprove applications
305 for proposed development that does not comply with the applicable provisions of these
306 regulations and shall notify the application of such disapproval, in writing, stating the reasons for
307 disapproval.
308
309 (C) Expiration of permit.
310 A permit is valid provided the actual start of construction occurs within 180 days of the
311 date of permit issuance. If the actual start of construction is not within 180 days of the date of
312 permit issuance, requests for extensions shall be submitted in writing. Upon reviewing the
313 request and the permit for continued compliance with these regulations, the Floodplain
314 Administrator may grant, in writing, one or more extensions of time, for periods not more than
315 180 days each. Permit fees shall be as provided for in Appendix F – Fees and Fines.
316
Page 7
Paj 133
317 50-25. Inspections.
318 The Floodplain Administrator shall make periodic inspections of development permitted in special flood
319 hazard areas, at appropriate times throughout the period of construction in order to monitor compliance. In
320 addition to the inspections required by the building code, such inspections may include:
321 (A) Stake-out inspection, to determine location on the site relative to the special flood hazard area
322 and floodway.
323 (B) Foundation inspection, upon placement of the lowest floor and prior to further vertical
324 construction, to collect information or certification of the elevation of the lowest floor.
325 (C) Enclosure inspection, including crawlspaces, to determine compliance with applicable
326 provisions.
327 (D) Utility inspection, upon installation of specified equipment and appliances, to determine
328 appropriate location with respect to the base flood elevation.
329 (E) Storage of Materials.
330
331 50-26. Submissions required prior to issuance of a certificate of occupancy.
332 The following certifications are required to be submitted by the permittee for development that is
333 permitted in special flood hazard areas prior to the issuance of a Certificate of Occupancy:
334 (A) For new or substantially improved residential structures or nonresidential structures that have
335 been elevated, an Elevation Certificate that shows the ground elevation and finished elevations
336 (identified in Section C of the Elevation Certificate as “Finished Construction”).
337 (B) For nonresidential structures that have been dry floodproofed, a Floodproofing Certificate based
338 on “Finished Construction” (identified in Section II).
339 (C) For all development activities subject to the requirements of Section 3.4(B), a Letter of Map
340 Revision shall be provided.
341
342 50-27. Flood insurance rate map use and interpretation.
343 The floodplain administrator shall make interpretations, where needed, as to the exact location of special
344 flood hazard areas, floodplain boundaries, and floodway boundaries. The following shall apply to the use and
345 interpretation of special flood hazard maps and data:
346 (A) In FEMA-identified special flood hazard areas where base flood elevation and floodway data
347 have not been identified and in areas where FEMA has not identified special flood hazard areas,
348 any other flood hazard data available from a federal, state, or other source shall be reviewed and
349 reasonably used. When a Preliminary Flood Insurance Rate Map has been provided by FEMA to
350 identify base flood elevations where such elevations were not previously shown, the base flood
351 elevations on the Preliminary Flood Insurance Rate Map shall be used.
352 (B) Special flood hazard area delineations, base flood elevations, and floodway boundaries on
353 FEMA maps and in FEMA studies shall take precedence over delineations, base flood
354 elevations, and floodway boundaries by any other source that reflect a reduced special flood
355 hazard area, reduced floodway width and/or lower base flood elevations.
356 (C) Other sources of data shall be reasonably used, with the approval of the floodplain administrator,
357 if they show increased base flood elevations and/or larger floodway areas than are shown on
358 FEMA flood maps and studies.
359 (D) Where field surveyed topography indicates that ground elevations are below the base flood
360 elevation, even in areas not delineated as a special flood hazard on a flood hazard map, the area
Page 8
Paj 134
361 shall be considered as special flood hazard area.
362
363 Secs. 50-28—50-29. Reserved.
364
365 ARTICLE III. REQUIREMENTS IN ALL SPECIAL FLOOD HAZARD AREAS
366
367 50-30. Application of requirements.
368 The general requirements of this section apply to all development proposed within special flood hazard
369 areas identified in Section 1.4.
370
371 50-31. Subdivisions and developments.
372 (A) All subdivision and development proposals shall be consistent with the need to minimize flood
373 damage and are subject to all applicable standards in these regulations.
374 (B) All subdivision and development proposals shall have utilities and facilities such as sewer, gas,
375 electrical, and water systems located and constructed to minimize flood damage.
376 (C) All subdivision and developments proposals shall have adequate drainage provided to reduce
377 exposure to flood damage.
378 (D) All subdivision proposals and development proposals containing at least 50 lots or at least 5
379 acres, whichever is the lesser, in FEMA-delineated special flood hazard areas where base flood
380 elevation data are not available, shall be supported by hydrologic and hydraulic engineering
381 analyses that determine base flood elevations and floodway delineations. The analyses shall be
382 prepared by a licensed professional engineer in a format required by FEMA for a Conditional
383 Letter of Map Revision or Letter of Map Revision. Submittal requirements and processing fees
384 shall be the responsibility of the applicant.
385
386 50-32. Protection of water supply and sanitary sewage systems.
387 (A) New and replacement water supply systems shall be designed to minimize or eliminate
388 infiltration of flood waters into the systems.
389 (B) New and replacement sanitary sewage systems shall be designed to minimize or eliminate
390 infiltration of floodwaters into systems and discharges from systems into floodwaters.
391 (C) On-site waste disposal systems shall be located to avoid impairment to or contamination from
392 them during conditions of flooding.
393
394 50-33. Buildings and structures.
395 All new construction of buildings and structures, including placement of manufactured homes and
396 substantial improvements to existing buildings and structures, that are to be located, in whole or in part, in
397 special flood hazard areas shall comply with flood load and flood-resistant construction requirements of the
398 building code.
399
400 50-34. Fill.
401 (A) Disposal of fill, including but not limited to rubble, construction debris, woody debris, and trash,
402 shall not be permitted in special flood hazard areas.
403 (B) Where permitted by the building code (Zones A, AE, and AO), fill placed for the purpose of
404 raising the ground level and to support a building or structure shall meet the following
405 requirements:
Page 9
Paj 135
406 (1) Extend laterally from the building footprint to provide for adequate access, as a function
407 of use; the Floodplain Administrator may seek advice from the Fire Marshal’s Office
408 and/or the local fire services agency.
409 (2) Placed and compacted to provide for stability under conditions of rising and falling
410 floodwaters and resistance to erosion, scour, and settling.
411 (3) Consist of soil or rock materials only.
412 (4) Sloped no steeper than one (1) vertical on two (2) horizontal, unless approved by the
413 Floodplain Administrator.
414 (5) Designed with provisions for adequate drainage and no adverse effect on adjacent
415 properties.
416 (C) Fill placed for a purpose other than to support a building or structure shall meet the requirements
417 of Sections 4.5(B)(2) through (B)(5).
418
419 50-35. Historic structures.
420 As specified by the building code, repair, alteration, or rehabilitation of historic structures shall be subject to the
421 requirements of the building code unless a determination is made that compliance will preclude a structure’s
422 continued designation as a historic structure and a variance is granted in accordance with Section 7 and such
423 variance is the minimum necessary to preserve the historic character and design of the structure.
424
425 50-36. Recreational vehicles.
426 (A) Recreational vehicles in special flood hazard areas shall be fully licensed and ready for highway
427 use, and shall be placed on a site for less than 180 consecutive days.
428 (B) Recreational vehicles that are not fully licensed and ready for highway use, or that are to be
429 placed on a site for more than 180 consecutive days, shall meet the requirements of Section 4.9
430 for manufactured homes.
431
432 50-37. Gas or liquid storage tanks.
433 (A) Underground tanks in special flood hazard areas shall be anchored to prevent flotation, collapse
434 or lateral movement resulting from hydrostatic loads, including the effects of buoyancy, during
435 conditions of the base flood.
436 (B) Above-ground tanks in special flood hazard areas shall be elevated and anchored to or above the
437 base flood elevation plus 18 inches or shall be anchored at- grade and designed and constructed
438 to prevent flotation, collapse, or lateral movement resulting from hydrodynamic and hydrostatic
439 loads, including the effects of buoyancy, during conditions of the base flood.
440 (C) In special flood hazard areas, tank inlets, fill openings, outlets and vents shall be:
441 (1) At or above the base flood elevation or fitted with covers designed to prevent the inflow
442 of floodwater or outflow of the contents of the tanks during conditions of the base flood.
443 (2) Anchored to prevent lateral movement resulting from hydrodynamic and hydrostatic
444 loads, including the effects of buoyancy, during conditions of the base flood.
445
446 50-38. Manufactured homes.
447 (A) Elevation. All new and replacement manufactured homes to be placed or substantially improved
448 in a flood hazard area shall be elevated such that the bottom of the lowest horizontal structural
449 supporting member of lowest floor of the manufactured home is elevated to or above the base
Page 10
Paj 136
450 flood elevation plus 18 inches.
451 (B) Foundations. All new and replacement manufactured homes, including substantial
452 improvement of existing manufactured homes, shall be placed on permanent, reinforced
453 foundations that are designed in accordance with Section R322 of the residential code based on
454 the applicable flood zone identified on the FIRM.
455 (C) Anchoring. All new and replacement manufactured homes to be placed or substantially
456 improved in a special flood hazard area shall be installed using methods and practices which
457 minimize flood damage. Manufactured homes shall be securely anchored to an adequately
458 anchored foundation system to resist flotation, collapse and lateral movement. The anchor and
459 tie-down specifications of the manufacturer are permitted, provided such specifications are
460 specific to installation in special flood hazard areas. This requirement is in addition to applicable
461 state and local anchoring requirements for resisting wind forces.
462 (D) Enclosures. Fully enclosed areas below elevated manufactured homes shall comply with the
463 requirements of Section R322 of the residential code based on the applicable flood zone
464 identified on the FIRM.
465 (E) Protection of mechanical equipment and outside appliances. Mechanical equipment and
466 outside appliances shall comply with the requirements of Section R322 for protection of
467 mechanical and electrical systems.
468
469 50-39. Accessory structures.
470 Accessory structures shall meet the requirements of these regulations. Accessory structures that have a
471 footprint of no more than 200 square feet may be allowed without requiring elevation or floodproofing provided
472 such structures meet all of the following requirements:
473 (A) Useable only for parking or limited storage;
474 (B) Constructed with flood damage-resistant materials below the base flood elevation;
475 (C) Constructed and placed to offer the minimum resistance to the flow of flood waters;
476 (D) Firmly anchored to prevent flotation, collapse, and lateral movement;
477 (E) Electrical service and mechanical equipment elevated to or above the level of the base flood
478 elevation plus 18 inches; and
479 (F) Equipped with flood openings that meet the requirements of Section R322.2.2 of the residential
480 code.
481 (G) For guidance, see FEMA Technical Bulletin #7 – Wet Floodproofing Requirements.
482
483 50-40. Protection of flood-carrying capacity.
484 (A) Development in floodways.
485 Within any floodway area designated on the Flood Insurance Rate Map, no encroachments, including
486 fill, new construction, substantial improvements, or other development shall be permitted unless it has
487 been demonstrated through hydrologic and hydraulic engineering analysis that the proposed
488 encroachment would not result in any increase in flood levels within the community during the
489 occurrence of the base flood discharge. Such technical data shall be submitted to the Floodplain
490 Administrator and to FEMA. The analyses shall be prepared by a licensed professional engineer in a
491 format required by FEMA for a Conditional Letter of Map Revision or Letter of Map Revision.
492 Submittal requirements and processing fees shall be the responsibility of the applicant.
493 The proposed development activity may be permitted if the analyses demonstrate that the activity:
Page 11
Paj 137
494 (1) Will not result in any increase in the base flood elevation; or
495 (2) Will result in an increase in the base flood elevation, provided a Conditional Letter of
496 Map Revision has been issued by FEMA and the applicant completes all of the following:
497 (a) Submits technical data required in Section 3.4(A)(8)(e);
498 (b) Evaluates alternatives which would not result in increased base flood elevations
499 and an explanation why these alternatives are not feasible;
500 (c) Certifies that no structures are located in areas which would be impacted by the
501 increased base flood elevation;
502 (d) Documents that individual legal notices have been delivered to all impacted
503 property owners to explain the impact of the proposed action on their properties;
504 (e) Requests and receives concurrence of the City Manager of the City of Dover and
505 the Chief Executive Officer of any other community impacted by the proposed
506 actions; and
507 (f) Notifies the Delaware Department of Natural Resources and Environmental
508 Control (Division of Watershed Stewardship).
509
510 (B) Development in areas with base flood elevations but no foodways.
511 For development activities in a special flood hazard area with base flood elevations but no designated
512 floodways, the applicant shall develop hydrologic and hydraulic engineering analyses and technical data
513 reflecting the proposed activity and shall submit such analyses and data to the Floodplain Administrator
514 and to FEMA. The analyses shall be prepared by a licensed professional engineer in a format required
515 by FEMA for a Conditional Letter of Map Revision or Letter of Map Revision. Submittal requirements
516 and processing fees shall be the responsibility of the applicant.
517 The proposed development activity may be permitted if the analyses demonstrate that the cumulative
518 effect of the proposed development activity, when combined with all other existing and potential special
519 flood hazard area encroachments will not increase the base flood elevation more than 1.0 (one) foot at
520 any point.
521
522 (C) Deliberate alterations of a watercourse.
523 For the purpose of these regulations, a watercourse is deliberately altered when a person causes a change
524 to occur within its banks. Deliberate changes to a watercourse include, but are not limited to: widening,
525 deepening or relocating of the channel; installation of culverts; construction of bridges, and excavation
526 or filling of the channel or watercourse banks.
527 For any proposed deliberate alteration of a watercourse, the applicant shall develop hydrologic and
528 hydraulic engineering analyses and technical data reflecting such changes and submit such technical
529 data to the Floodplain Administrator and to FEMA. The analyses shall be prepared by a licensed
530 professional engineer in a format required by FEMA for a Conditional Letter of Map Revision or Letter
531 of Map Revision. Submittal requirements and processing fees shall be the responsibility of the
532 applicant.
533 The proposed alteration of a watercourse may be permitted upon submission, by the applicant, of the
534 following:
535 (1) Documentation of compliance with Section 4.11(A) if the alteration is in a floodway or
536 Section 4.11(B) if the alteration is in a watercourse with base flood elevations but no
537 floodway.
538 (2) A description of the extent to which the watercourse will be altered or relocated as a
Page 12
Paj 138
539 result of the proposed development.
540 (3) A certification by a licensed professional engineer that the bankful flood-carrying
541 capacity of the watercourse will not be diminished.
542 (4) Evidence that adjacent communities, the U.S. Army Corps of Engineers, and the
543 Delaware Department of Natural Resources and Environmental Control (Division of
544 Watershed Stewardship) have been notified of the proposal and evidence that such
545 notifications have been submitted to the Federal Emergency Management Agency.
546 (5) Evidence that the applicant shall be responsible for providing the necessary maintenance
547 for the altered or relocated portion of the watercourse so that the flood carrying capacity
548 will not be diminished. The Floodplain Administrator may require the permit holder to
549 enter into an agreement with the City of Dover specifying the maintenance
550 responsibilities; if an agreement is required, the permit shall be conditioned to require
551 that the agreement be recorded on the deed of the property which shall be binding on
552 future owners.
553 Secs. 50-41—50-45. Reserved.
554
555 ARTICLE IV. VARIANCES.
556
557 50-46. Variances.
558 The City of Dover Construction Code Appeals Committee shall have the power to authorize, in specific cases,
559 such variances from the requirements of these regulations and the flood load and flood load and flood-resistant
560 construction of the building code, not inconsistent with Federal regulations, as will not be contrary to the public
561 interest where, owing to special conditions of the lot or parcel, a literal enforcement of the provisions of these
562 regulations would result in unnecessary hardship.
563
564 (A) Application for a Variance.
565 (1) Any owner, or agent thereof, of property for which a variance is sought shall submit an
566 application for a variance to the Floodplain Administrator.
567 (2) At a minimum, such application shall contain the following information: Name, address,
568 and telephone number of the applicant; legal description of the property; parcel map;
569 description of the existing use; description of the proposed use; location of the floodplain;
570 description of the variance sought; and reason for the variance request. Each variance
571 application shall specifically address each of the considerations in Section 5.1(B) and the
572 limitations and conditions of Section 5.1(C).
573
574 (B) Considerations for variances.
575 In considering variance applications, the City of Dover Construction Code Appeals Committee shall
576 consider and make findings of fact on all evaluations, all relevant factors, requirements specified in
577 other sections of these regulations, and the following factors:
578 (1) The danger that materials may be swept onto other lands to the injury of others.
579 (2) The danger to life and property due to flooding or erosion damage.
580 (3) The susceptibility of the proposed development and its contents (if applicable) to flood
581 damage and the effect of such damage on the individual owner.
582 (4) The importance of the services provided by the proposed development to the community.
Page 13
Paj 139
583 (5) The availability of alternative locations for the proposed use which are not subject to, or
584 are subject to less, flooding or erosion damage.
585 (6) The necessity to the facility of a waterfront location, where applicable, or if the facility is
586 a functionally dependent use.
587 (7) The compatibility of the proposed use with existing and anticipated development.
588 (8) The relationship of the proposed use to the comprehensive plan for that area.
589 (9) The safety of access to the property in times of flood for ordinary and emergency
590 vehicles.
591 (10) The expected heights, velocity, duration, rate of rise, and sediment transport of the flood
592 waters and the effects of wave action, if applicable, expected at the site.
593 (11) The costs of providing governmental services during and after flood conditions, including
594 maintenance and repair of public utilities and facilities such as sewer, gas, electrical, and
595 water systems, and streets and bridges.
596
597 (C) Limitations for variances.
598 (1) An affirmative decision on a variance request shall only be issued upon:
599 (a) A showing of good and sufficient cause. A “good and sufficient” cause is one
600 that deals solely with the physical characteristics of the property and cannot be
601 based on the character of the planned construction or substantial improvement, the
602 personal characteristics of the owner or inhabitants, or local provisions that
603 regulate standards other than health and public safety standards.
604 (b) A determination that failure to grant the variance would result in exceptional
605 hardship due to the physical characteristics of the property.
606 (c) Increased cost or inconvenience of meeting the requirements of these regulations
607 does not constitute an exceptional hardship to the applicant.
608 (d) A determination that the granting of a variance for development within any
609 designated floodway, or special flood hazard area with base flood elevations but
610 no floodway, will not result in increased flood heights beyond that which is
611 allowed in these regulations.
612 (e) A determination that the granting of a variance will not result in additional threats
613 to public safety; extraordinary public expense, nuisances, fraud on or
614 victimization of the public, or conflict with existing local laws.
615 (f) A determination that the structure or other development is protected by methods
616 to minimize flood damages.
617 (g) A determination that the variance is the minimum necessary, considering the
618 flood hazard, to afford relief.
619 (2) Upon consideration of the individual circumstances, the limitations and conditions, and
620 the purposes of these regulations, the City of Dover Construction Code Appeals
621 Committee may attach such conditions to variances as it deems necessary to further the
622 purposes of these regulations.
623 (3) The City of Dover Construction Code Appeals Committee shall notify any applicant in
624 writing to whom a variance is granted for a building or structure with a lowest floor
625 elevation below the base flood elevation that the variance is to the floodplain
626 management requirements only, and that the cost of federal flood insurance will be
Page 14
Paj 140
627 commensurate with the increased risk.
628 Secs. 50-47—50-49. Reserved.
629
630 ARTICLE V. ENFORCEMENT
631
632 50-50. Compliance required.
633 (A) No structure or land development shall hereafter be located, erected, constructed, reconstructed,
634 repaired, extended, converted, enlarged or altered without full compliance with these regulations
635 and all other applicable regulations which apply to uses within the jurisdiction of these
636 regulations.
637 (B) Failure to obtain a permit shall be a violation of these regulations and shall be punishable in
638 accordance with Section 6.2.
639 (C) Permits issued on the basis of plans and applications approved by the Floodplain Administrator
640 authorize only the specific activities set forth in such approved plans and applications or
641 amendments thereto. Use, arrangement, or construction of such specific activities that is
642 contrary to that authorized shall be deemed a violation of these regulations.
643
644
645 50-51. Violations and Penalties
646 (a) Violation of any provision or requirement of this ordinance or violation of any statement, plan,
647 application, permit or certificate approved under the provisions of this ordinance shall be considered a
648 misdemeanor.
649
650 (b) The owner, general agent or contractor of a building, premises, or part thereof, where such a
651 violation had been committed or does exist, shall be guilty of such misdemeanor.
652
653 (c) Any agent, contractor, architect, builder, corporation or other person who commits, takes part or
654 assists in such violation shall be guilty of such misdemeanor.
655
656 (d) The imposition of a fine or penalty for any violation of, or noncompliance with, this article shall
657 not excuse the violation or noncompliance or permit it to continue; and all such persons shall be required
658 to correct or remedy such violations or noncompliances within a reasonable time. Each day that a
659 violation continues after due notice has been served shall be deemed a separate offense.
660
661 (e) Penalties for violations or non-compliance shall be as provided for in Appendix F – Fees and
662 Fines.
663
664 ARTICLE VI. DEFINITIONS
665
666 The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in
667 this section, except where the context clearly indicates a different meaning. Where terms are not defined in
668 these regulations and are defined in the building code, such terms shall have the meanings ascribed to them in
669 that code.
670 Accessory structure: For the purposes of these regulations, a structure on the same lot with, and of a
671 nature customarily incidental and subordinate to, the principal structure.
672
673 Area of shallow flooding: A designated Zone AO on a community’s Flood Insurance Rate Map with a
674 one percent annual chance or greater of flooding to an average depth of one to three feet where a clearly defined
Page 15
Paj 141
675 channel does not exist, where the path of flooding is unpredictable, and where velocity flow may be evident.
676 Such flooding is characterized by ponding or sheet flow.
677
678 Base flood: The flood having a one percent chance of being equaled or exceeded in any given year; the
679 base flood also is referred to as the 100-year flood (or the 1%-annual-chance flood).
680
681 Base flood discharge: The volume of water resulting from a Base Flood as it passes a given location
682 within a given time, usually expressed in cubic feet per second (cfs).
683 Base flood elevation: The elevation of the base flood, including wave height, relative to the National
684 Geodetic Vertical Datum (NGVD), North American Vertical Datum (NAVD) or other datum specified on the
685 community’s Flood Insurance Rate Map.
686
687 Basement: Any area of the building having its floor subgrade (below ground level) on all sides.
688
689 Building Code: The family of building codes specifically adopted by the City of Dover in the Dover
690 Code of Ordinances – Chapter 22 – Buildings and Building Regulations. The code that applies to one- and two-
691 family dwellings is referred to as the “residential code.”
692
693 Development: Any manmade change to improved or unimproved real estate, including but not limited
694 to buildings or other structures, placement of manufactured homes, mining, dredging, filling, grading, paving,
695 excavation or drilling operations or storage of equipment or materials.
696
697 Elevation Certificate: The National Flood Insurance Program, Elevation Certificate (FEMA Form
698 086-0-33), used to document building elevations and other information about buildings. When required to be
699 certified, the form shall be completed by a licensed professional land surveyor.
700
701 Federal Emergency Management Agency (FEMA): The federal agency with the overall
702 responsibility for administering the National Flood Insurance Program.
703
704 FEMA Technical Bulletin: A series of guidance documents published by FEMA to provide guidance
705 concerning building performance standards of the National Flood Insurance Program. See sections where
706 specific TBs are identified.
707
708 Flood or Flooding: A general and temporary condition of partial or complete inundation of normally
709 dry land areas from:
710 (1) The overflow of inland or tidal waters, and/or
711 (2) The unusual and rapid accumulation or runoff of surface waters from any source.
712
713 Flood damage-resistant materials: Any construction material capable of withstanding direct and
714 prolonged contact with floodwaters without sustaining any damage that requires more than cosmetic repair. See
715 FEMA Technical Bulletin #2 – Flood Damage-Resistant Materials Requirements and FEMA Technical Bulletin
716 #8 – Corrosion Protection for Metal Connectors in Coastal Areas.
717
718 Flood Insurance Rate Map (FIRM): An official map on which the Federal Emergency Management
719 Agency (FEMA) has delineated both the special flood hazard areas and the risk premium zones applicable to
720 the community.
721 Zone A: Special flood hazard areas inundated by the 1% annual chance flood; base flood
722 elevations are not determined.
Page 16
Paj 142
723 Zone AE: Special flood hazard areas subject to inundation by the 1% annual chance flood; base
724 flood elevations are determined; floodways may or may not be determined.
725 Zone AO: Areas of shallow flooding, with or without a designated average flood depth.
726 Zone X (shaded): Areas subject to inundation by the 500-year flood (0.2% annual chance); areas
727 subject to the 1% annual chance flood with average depths of less than 1 foot or with contributing
728 drainage area less than 1 square mile; and areas protected by levees from the base flood.
729 Zone X (unshaded): Areas determined to be outside the 1% annual chance flood and outside the
730 500-year floodplain.
731
732 Flood Insurance Study: The official report provided by the Federal Emergency Management Agency
733 (FEMA) containing the Flood Insurance Rate Map (FIRM), the Flood Boundary and Floodway Map (FBFM),
734 the water surface elevations of the base flood and supporting technical data.
735
736 Floodplain: Any land area susceptible to being inundated by water from any source (see “Flood” or
737 “Flooding”).
738
739 Dry floodproofing: A combination of measures which results in a structures, including attendant
740 utilities and equipment, being watertight with all elements substantially impermeable and with structural
741 components having the capacity to resist flood loads.
742
743 Floodproofing Certificate: The National Flood Insurance Program, Floodproofing Certificate for
744 Non-Residential Structures (FEMA Form 86-0-34), used by registered professional engineers and architects to
745 certify dry floodproofing designs.
746
747 Floodway: The channel of a river or other watercourse and the adjacent land areas that must be
748 reserved in order to pass the base flood discharge such that the cumulative increase in the water surface
749 elevation of the base flood discharge is no more than a designated height.
750
751 Functionally dependent use: A use which cannot perform its intended purpose unless it is located or
752 carried out in close proximity to water; the term includes only docking facilities, port facilities that are
753 necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, but
754 does not include long-term storage or related manufacturing facilities.
755
756 Highest adjacent grade: The highest natural elevation of the ground surface prior to construction next
757 to the proposed walls of a structure.
758
759 Historic structure: Any structure that is:
760
761 (1) Individually listed in the National Register of Historic Places (a listing maintained by the U.S.
762 Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting
763 the requirements for individual listing on the National Register;
764 (2) Certified or preliminarily determined by the Secretary of the Interior as contributing to the
765 historical significance of a registered historic district or a district preliminarily determined by the
766 Secretary to qualify as a registered historic district.
767
768 Hydrologic and hydraulic engineering analysis: An analysis performed by a professional engineer,
769 licensed in the State of Delaware, in accordance with standard engineering practices as accepted by FEMA,
770 used to determine the base flood, other frequency floods, flood elevations, floodway information and
771 boundaries, and flood profiles.
772
Page 17
Paj 143
773 Letter of Map Change: A Letter of Map Change is an official FEMA determination, by letter, to
774 amend or revise an effective Flood Insurance Rate Map, Flood Boundary and Floodway Map, and Flood
775 Insurance Study. Letters of Map Change include:
776 Letter of Map Amendment (LOMA): An amendment based on technical data showing that a property
777 Was inadvertently included in a designated special flood hazard area. A LOMA amends the current effective
778 Flood Insurance Rate Map and establishes that a specific property is not located in a special flood hazard area.
779 Letter of Map Revision (LOMR): A revision based on technical data that may show changes to flood
780 zones, flood elevations, floodplain and floodway delineations, and planimetric features. One common type of
781 LOMR, a Letter of Map Revision Based on Fill (LOMR-F), is a determination that a structure or parcel of land
782 has been elevated by fill above the base flood elevation and is, therefore, no longer exposed to flooding
783 associated with the base flood; in order to qualify for this determination, the fill must have been permitted and
784 placed in accordance with these regulations.
785 Conditional Letter of Map Revision (CLOMR): A formal review and comment as to whether a
786 proposed flood protection project complies with the minimum National Flood Insurance Program requirements
787 for such projects with respect to delineation of special flood hazard areas. A CLOMR does not amend or revise
788 effective Flood Insurance Rate Maps, Flood Boundary and Floodway Maps, or Flood Insurance Studies; upon
789 submission to and approval of certified as-built documentation, a Letter of Map Revision may be issued.
790
791 Lowest floor: The lowest floor of the lowest enclosed area, including basement, but excluding any
792 unfinished or flood-resistant enclosure, usable solely for vehicle parking, building access or limited storage
793 provided that such enclosure is not built so as to render the structure in violation of the non-elevation
794 requirements specified in the building code for enclosures below the lowest floor.
795
796 Manufactured home: A structure, transportable in one or more sections, which is built on a permanent
797 chassis and is designed for use with or without a permanent foundation when connected to the required utilities.
798 The term "manufactured home" does not include a "recreational vehicle".
799
800 New construction: Buildings and structures for which the "start of construction" commenced on or
801 after September 16, 1982, including any subsequent improvements to such structures
802
803 Person: An individual or group of individuals, corporation, partnership, association, or any other entity,
804 including state and local governments and agencies.
805
806 Recreational vehicle: A vehicle which is built on a single chassis, 400 square feet or less when
807 measured at the largest horizontal projection, designed to be self- propelled or permanently towable by a light
808 duty truck, and designed primarily not for use as a permanent dwelling but as temporary living quarters for
809 recreational, camping, travel, or seasonal use.
810
811 Special flood hazard area: The land in the floodplain subject flood hazards and shown on a Flood
812 Insurance Rate Map as Zones A, AE, and AO. The term includes areas shown on other flood hazard maps that
813 are specifically listed or otherwise described in Section 1.4.
814
815 Start of construction: The date of issuance of permits for new construction and substantial
816 improvements to existing structures, provided the actual start of construction, repair, reconstruction,
817 rehabilitation, addition, placement, or other improvement was within 180 days after the date of issuance. The
818 actual start means the first placement of permanent construction of a building (including a manufactured home)
819 on a site, such as the pouring of a slab or footings, installation of pilings, or construction of columns. Permanent
820 construction does not include land preparation (such as clearing, grading and filling), the installation of streets
821 or walkways, excavation for a basement, footings, piers, or foundations, the erection of temporary forms or the
822 installation of accessory buildings such as garages or sheds not occupied as dwelling units or not part of the
Page 18
Paj 144
823 main building. For a substantial improvement, the actual “start of construction” means the first alteration of any
824 wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external
825 dimensions of the building.
826
827 Structure (or building): That which is built or constructed.
828
829 Substantial damage: Damage of any origin sustained by a structure whereby the cost of restoring the
830 structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure
831 before the damage occurred.
832
833 Substantial improvement: Any repair, alteration, reconstruction, rehabilitation, addition, or other
834 improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure
835 before improvement or repair is started. If the structure has sustained substantial damage, any repairs are
836 considered substantial improvement regardless of the actual repair work performed. The term does not,
837 however, include any project for improvement of a building required to correct existing health, sanitary, or
838 safety code violations identified by the building official and that are the minimum necessary to assure safe
839 living conditions.
840
841 Violation: The failure of a structure or other development to be fully compliant with the community’s
842 flood plain management regulations. A structure or other development without the Elevation Certificate, other
843 certifications, or other evidence of compliance required in these regulations is presumed to be in violation until
844 such time that documentation is provided.
845
846 ARTICLE VII. APPLICABILITY
847
848 For the purposes of jurisdictional applicability, this ordinance shall apply in the City of Dover,
849 Delaware. This ordinance shall apply to all applications for development, including building permit applications
850 and subdivision proposals, submitted on or after July 7, 2104
851
852 BE IT FURTHER ORDAINED:
853
854 That Chapter 22 – Buildings and Building Regulations, Article III – Building Code, Section 22-61 –
855 Adopted, (a) International Building Code adopted, Section 1612.3 - Establishment of flood hazard areas,
856 of the Dover Code, be amended by deleting it in its entirety and inserting in lieu thereof the following:
857
858 Section 1612.3: Flood Insurance Study for the City of Dover, dated July 7, 2014, or as subsequently
859 amended or revised.
860
861 That Chapter 22 – Buildings and Building Regulations, Article III – Building Code, Section 22-61 –
862 Adopted, (a) International Residential Code adopted, Section R301.2, Table R301.2(1) Climatic and
863 Geographic Design Criteria, of the Dover Code, be amended by deleting it in its entirety and inserting in
864 lieu thereof the following:
865
866
867
868
869
870
871
872
873
Page 19
Paj 145
874 Table R301.2(1) Climatic and Geographic Design Criteria
875
Ground Wind Design Seismic Subject to Damage From Winter Ice Flood Hazards Air Mean
g
Snow Design c Design Barrier Freezing Annual
Speed Topographic Weathering Frost Termite
Load d k Category a Temp Under- Index Temperature
effects f line e j
layment ;sup\sup;
(mph) Depth
Required
;sup\sup; h
25 95 NO A Severe 24" Moderate 14° NO Adopted in 450 55°
gust To Heavy Chapter 50 of
77 the Code of the
fastest City of Dover
876
877 BE IT FURTHER ORDAINED:
878 That Chapter 22 – Buildings and Building Regulations, Article III – Building Code, Section 22-61 –
879 Adopted, (a) International Building Code adopted, be amended by inserting Section 1612.4.1, as follows:
880 Section 1612.4.1 Elevation requirements. The minimum elevation requirements shall be as specified in
881 ASCE 24 or the base flood elevation plus 18 inches, whichever is higher.
882 BE IT FURTHER ORDAINED:
883
884 That Chapter 22 – Buildings and Building Regulations, Article III—Building Code, Section 22-61 –
885 Adopted, International Residential Code Adopted, be amended by inserting the following:
886
887 Table R301.2(1), footnote (g): September 16, 1982, Flood Insurance Study for Kent County and Incorporated
888 Areas], dated July 7, 2014, or as subsequently amended or revised.
889
890 R322.2.1 Elevation requirements.
891
892 1. Buildings and structures in flood hazard areas not designated as Coastal A Zones shall have the
893 lowest floors elevated to or above the base flood elevation plus 18 inches or the design flood
894 elevation, whichever is higher.
895 2. Buildings and structures in flood hazard areas designated as Coastal A Zones shall have the
896 lowest floors elevated to or above the base flood elevation plus 1 foot (305 mm), or to the
897 design flood elevation, whichever is higher.
898 3. In areas of shallow flooding (AO Zones), buildings and structures shall have the lowest floor
899 (including basement) elevated at least as high above the highest adjacent grade as the depth
900 number specified in feet on the FIRM plus 18 inches or at least 3.5 feet if a depth number is not
901 specified.
902 4. Basement floors that are below grade on all sides shall be elevated to or above the base flood
903 elevation plus 18 inches or the design flood elevation, whichever is higher.
904
905 Exception: Enclosed areas below the design flood elevation, including basements whose floors are
906 not below grade on all sides, shall meet the requirements of Section R322.2.2.
907
908 BE IT FURTHER ORDAINED:
909
910 That Appendix F – Fees and Fines, be amended by inserting the bold, blue text, and deleting the text indicated
911 in red strikeout, as follows:
912
Page 20
Paj 146
Chapter 50 - Floods, Article II—Flood Damage Prevention Article II. Administration
50-50 22. Permit $50.00
Permits
required. Permit Extension $25.00
Violation and non-compliance; Not less than $25.00 nor more than
penalties $100.00, plus cost of prosecution
913
914
915 ADOPTED: *
916
917 SYNOPSIS
918 The proposed amendment replaces Chapter 50 – Floods, of the Dover Code of Ordinances in its entirety, adopts
919 flood hazard maps, designates a floodplain administrator, adopts administrative procedures, coordinates with
920 the building code, and adopts criteria for development in flood hazard areas. Additionally, Chapter 22 –
921 Buildings and Building Regulations and Appendix F – Fees and Fines have been amended accordingly.
922
923 Actions History
924 05/27/2014 - Scheduled for First Reading at Council
925 04/28/2014 - Introduced at the Legislative, Finance, and Administration Committee
926
Page 21
Paj 147
FIRST READING
1 of 10
ACTION FORM
PROCEEDING: Legislative, Finance & Administration Committee
DEPARTMENT OF ORIGIN: Finance DATE SUBMITTED: 04/23/2014
PREPARED BY: Donna Mitchell, Controller/Treasurer
SUBJECT: Proposed Budget Amendment for Fiscal Year 2014
APPROVALS: City Council
REVIEWED BY: City Manager
EXHIBITS: Proposed Budget Ordinance #2014 – 10
TIMETABLE: Upon approval
RECOMMENDED ACTION:
Staff recommends approval of the Budget Ordinance # 2014 – 10 for Fiscal Year 2014.
Attached is a second set of budget amendments for Fiscal Year 2013/2014. The first budget amendment
(2013-08) was approved on January 27, 2014. The proposed budget ordinance amending the Fiscal 2014
budget encompasses the following changes.
Revenues have been adjusted to reflect the current forecast.
Pension accounting changes are reflected, shifting the fund expenses back to the Divisions and
interfund service line items in the General Fund, Water/Wastewater Fund and Electric Revenue
Fund.
Incorporates internal budget adjustments completed in accordance with budget amendment
authority of the City Manager. I.e. transferring salary savings to contractual services for seasonal
grass mowing due to vacancies.
Transfers $77,000 of savings in temporary help for the Library to the Inspections demolition
account to fund the Council action approved for increased demolition cost.
Operating expense reductions based on annual budget reviews with the City Manager.
Also included are the following additional items of which a couple of them have previously been
discussed with City Council and the others are included for discussion now.
Salt Barn – Street Division CIP budget $50,000. Was inadvertently dropped off in the project
carry forwards in the January ordinance. Another $15,000 for Kent Conservation District storm
water.
Demolition of the White Oak Park recreation building – Current estimate $70,500 in the
Recreation Division CIP.
Old Library clean up – Current estimate $35,000 in the Library Division CIP.
Contractual services in the Finance Division $12,000 for agreed upon procedure engagement with
current auditors to review internal control procedures, revenue procedures and cash handling
procedures at Recreation, Library and Police Divisions.
Water Utility – U.S. 13 Water Main –WQ0907 – lawsuit settlement with Eastern States
Construction $141,600.
All of these items are being funded through salary savings within the budget. The transfer to the Capital
Project Fund has been adjusted for the CIP items.
Paj 148
FIRST READING
2 of 10
CITY OF DOVER ORDINANCE # 2014-10
2013-2014 BUDGET ORDINANCES - SECOND AMENDMENT
1 GENERAL FUND
2 REVENUES AND BUDGET FOR 2013-2014
3 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:
4 The amount hereinafter named aggregating Forty-One Million, Ninety-Seven Thousand dollars
5 ($41,097,000) or so much thereof as may be necessary are hereby appropriated from current revenues
6 and other funds for the use by several departments of the Municipal Government for the Fiscal
7 Year beginning July 1, 2013 and ending June 30, 2014:
8 ORIGINAL REVISED
9 2013/14 2013/14
10 BUDGET BUDGET
11 BEGINNING BALANCE $ 3,455,200 $ 4,219,800
12 REVENUES
13 FINES AND POLICE REVENUE 666,000 573,900
14 INVESTMENT INCOME 75,000 40,000
15 LIBRARY REVENUES 66,600 70,500
16 KENT COUNTY BOOK REIMBURSEMENT 400,000 460,000
17 BUSINESS LICENSES 1,460,000 1,460,000
18 PERMITS AND OTHER LICENSES 1,167,500 1,332,500
19 MISCELLANEOUS CHARGES 63,300 53,100
20 POLICE EXTRA DUTY 650,000 650,000
21 PROPERTY TAXES 11,120,000 11,046,000
22 BID REVENUE 49,500 49,500
23 RECREATION REVENUE 133,000 148,800
24 FRANCHISE FEE 606,200 636,000
25 TRASH FEES 2,676,500 2,595,600
26 RENT REVENUE - GARRISON FARM 118,500 118,500
27 COURT OF CHANCERY FEES 863,200 1,002,200
28 REVENUES SUBTOTAL 20,115,300 20,236,600
29 INTERFUND SERVICE RECEIPTS
30 INTRAFUND SERVICE RECEIPTS WATER/WASTEWATER 1,134,900 1,360,300
31 INTRAFUND SERVICE RECEIPTS ELECTRIC 3,319,400 3,572,700
32 INTERFUND SERVICE RECEIPTS SUBTOTAL 4,454,300 4,933,000
33 GRANTS
34 POLICE RELATED 110,000 126,800
35 POLICE PENSION GRANT 500,000 500,000
36 GREEN ENERGY GRANT 98,500 98,500
37 MISCELLANEOUS GRANTS 25,000 25,000
38 GRANTS SUBTOTAL 733,500 750,300
39 TRANSFERS FROM
40 TRANSFER TAX 1,315,500 1,393,000
41 MUNICIPAL STREET AID 527,400 663,900
42 CIVIL TRAFFIC PENALTIES 600,000 368,400
43 WATER/WASTEWATER 500,000 500,000
44 ELECTRIC 8,000,000 8,000,000
45 OTHER RESERVES 32,000 32,000
46 TRANSFERS FROM SUBTOTAL 10,974,900 10,957,300
47 TOTAL REVENUES 36,278,000 36,877,200
48 TOTALS $ 39,733,200 $ 41,097,000
Paj 149
FIRST READING
3 of 10
49 2013-2014 BUDGET ORDINANCES - SECOND AMENDMENT - CONTINUED
50 GENERAL FUND - EXPENDITURES AND BUDGET BALANCE FOR 2013-2014
51 ORIGINAL REVISED
52 2013/14 2013/14
53 DEPARTMENT EXPENSES BUDGET BUDGET
54 CITY CLERK $ 334,400 $ 371,700
55 COUNCIL 107,800 107,800
56 TAX ASSESSOR 198,300 208,400
57 FIRE 692,100 741,600
58 GROUNDS MAINTENANCE 948,500 1,160,700
59 LIBRARY 1,330,400 1,336,900
60 RECREATION 708,200 717,200
61 LIFE SAFETY 468,200 491,400
62 CODE INFORCEMENT 377,100 432,300
63 PLANNING 444,800 422,600
64 INSPECTIONS 540,300 695,200
65 ECONOMIC DEVELOPMENT 215,200 215,200
66 POLICE 13,571,800 13,988,700
67 POLICE EXTRA DUTY 760,000 776,800
68 STREETS 603,700 660,300
69 SANITATION 2,153,800 2,253,500
70 CITY MANAGER 457,300 460,000
71 INFORMATION TECHNOLOGY 660,500 740,000
72 FINANCE 906,500 980,000
73 PUBLIC WORKS - ADMINISTRATION 425,800 513,100
74 FACILITIES MANAGEMENT 632,600 689,100
75 PROCUREMENT & INVENTORY 517,600 559,400
76 FLEET MAINTENANCE 720,700 770,900
77 CUSTOMER SERVICES 1,109,400 1,232,200
78 HUMAN RESOURCES 334,300 393,100
79 MAYOR 83,300 83,300
80 DEPARTMENT SUBTOTALS 29,302,600 31,001,400
81 OTHER EXPENSES
82 DEBT SERVICE 557,300 557,300
83 CONTRIBUTION TO DDP 162,400 162,400
84 MISCELLANEOUS GRANT RELATED EXPENSES 25,000 25,000
85 INSURANCE 658,900 658,900
86 RETIREES HEALTH CARE 1,636,500 1,636,500
87 OTHER EMPLOYMENT EXPENSES 400,000 118,800
88 PENSION UNFUNDED LIABILITY 1,159,100 121,000
89 POLICE PENSION FUND - STATE GRANT 500,000 500,000
90 POLICE PENSION FUND - UNFUNDED LIABILITY 307,400 689,400
91 UNCOLLECTIBLES - TRASH AND OTHER 10,000 10,000
92 STREET LIGHTS 836,000 774,500
93 OTHER EXPENSE SUBTOTAL 6,252,600 5,253,800
94 TRANSFERS
95 TRANSFER TO CAPITAL FUND - PROJECTS 1,278,300 1,448,800
96 TRANSFERS SUBTOTAL 1,278,300 1,448,800
97 TOTAL EXPENDITURES 36,833,500 37,704,000
98 CURRENT YEAR BALANCE 2,899,700 3,393,000
99 TOTALS $ 39,733,200 $ 41,097,000
100 The City Manager is hereby authorized, without further approval of the City Council, to make
101 interdepartmental transfers of up to five percent of the amount hereinafter appropriated to any
102 department with the exception of any transfers prohibited by City Procedure #F306.
103 ADOPTED:
Paj 150
FIRST READING
4 of 10
104 2013-2014 BUDGET ORDINANCES - SECOND AMENDMENT - CONTINUED
105 GOVERNMENTAL CAPITAL PROJECTS FUND
106 REVENUES AND BUDGET FOR 2013-2014
107 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:
108 The amount hereinafter named aggregating Five Million, Three Hundred Thirty-Three Thousand, Six Hundred
109 dollars ($5,333,600) or so much thereof as may be necessary are hereby appropriated from current revenues
110 and other funds for the use by several departments of the Municipal Government for the fiscal year beginning
111 July 1, 2013 and ending June 30, 2014:
112 REVENUES
113 ORIGINAL REVISED
114 2013/14 2013/14
115 BUDGET BUDGET
116 BEGINNING BALANCE $ 241,200 $ 2,801,800
117 BEGINNING BALANCE - LIBRARY PROJECT (74,700) 256,500
118 REVENUES
119 STATE GRANTS - OTHER 15,000 15,000
120 CONTRACTOR'S CONTRIBUTIONS - 264,800
121 TRANSFER FROM COMMUNITY TRANSPORTATION - 60,500
122 TRANSFER FROM GENERAL FUND FOR PROJECTS 1,278,300 1,448,800
123 TRANSFER FROM MUNICIPAL STREET AID - CAPITAL - 251,200
124 TRANSFER FROM PARKLAND RESERVE 95,000 80,000
125 SUBTOTAL PROJECT RECEIPTS 1,388,300 2,120,300
126 STATE GRANTS - LIBRARY - 150,000
127 LIBRARY CAPITAL PLEDGES - 5,000
128 SUBTOTAL LIBRARY PROJECT RECEIPTS - 155,000
129 TOTAL REVENUES 1,388,300 2,275,300
130 TOTAL BEGINNING BALANCE AND REVENUES $ 1,554,800 $ 5,333,600
131 EXPENSE SUMMARY
132 ORIGINAL REVISED
133 2013/14 2013/14
134 DEPARTMENT EXPENSES BUDGET BUDGET
135 FIRE $ 238,500 $ 238,500
136 GROUNDS MAINTENANCE 50,100 50,100
137 LIBRARY - 446,500
138 RECREATION 95,000 172,000
139 CODE ENFORCEMENT 30,000 30,900
140 POLICE 257,300 342,400
141 STREETS 251,500 1,524,600
142 STREETS - GARRISON FARM INFRASTRUCTURE - 1,936,100
143 SANITATION 402,100 395,600
144 INFORMATION TECHNOLOGY 7,000 7,000
145 FACILITIES MANAGEMENT 17,800 17,800
146 PROCUREMENT & INVENTORY 55,000 55,000
147 DEPARTMENT SUBTOTAL 1,404,300 5,216,500
148 CURRENT YEAR BALANCE 150,500 117,100
149 TOTALS $ 1,554,800 $ 5,333,600
150 The City Manager is hereby authorized, without further approval of the City Council, to make
151 interdepartmental transfers of up to five percent of the amount hereinafter appropriated to any
152 department with the exception of any transfers prohibited by City Procedure #F306.
153 ADOPTED:
Paj 151
FIRST READING
5 of 10
154 2013-2014 BUDGET ORDINANCES - SECOND AMENDMENT - CONTINUED
155 WATER/WASTEWATER FUND
156 REVENUES AND BUDGET FOR 2013-2014
157 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:
158 The amount hereinafter named aggregating Fourteen Million, One Hundred Eighty Thousand, Three
159 Hundred dollars ($14,180,300) or so much thereof as may be necessary are hereby appropriated
160 from current revenues and other funds for the use by several departments of the Municipal Govern-
161 ment for the fiscal year beginning July 1, 2013 and ending June 30, 2014:
162 ORIGINAL REVISED
163 2013/14 2013/14
164 BUDGET BUDGET
165 BEGINNING BALANCE - WATER $ 770,800 $ 732,700
166 BEGINNING BALANCE - WASTEWATER 412,600 441,400
167 BEGINNING BALANCE - KCSA 141,600 (17,300)
168 TOTAL BEGINNING BALANCES 1,325,000 1,156,800
169 BASE REVENUE
170 WATER FEES 4,730,700 4,396,000
171 WASTEWATER FEES 3,642,700 3,529,000
172 WASTEWATER ADJUSTMENT FEES 2,980,300 2,900,000
173 GROUNDWATER INFLOW ADJUSTMENT 1,324,600 1,302,300
174 WATER TANK SPACE LEASING 333,800 321,200
175 SEWER IMPACT FEES 323,000 237,900
176 WATER IMPACT FEES 357,000 262,700
177 INTEREST - WATER 9,100 3,900
178 INTEREST - WASTEWATER 14,000 6,100
179 MISCELLANEOUS SERVICE FEE 82,000 64,400
180 TOTAL REVENUES 13,797,200 13,023,500
181 TOTAL BEGINNING BALANCES AND REVENUES $ 15,122,200 $ 14,180,300
Paj 152
FIRST READING
6 of 10
182 2013-2014 BUDGET ORDINANCES - SECOND AMENDMENT - CONTINUED
183 WATER/WASTEWATER FUND - EXPENDITURES AND BUDGET BALANCE FOR 2013-2014
184 ORIGINAL REVISED
185 2013/14 2013/14
186 DIRECT EXPENSES BUDGET BUDGET
187 ENGINEERING & INSPECTION $ 664,400 $ 499,000
188 WATER CONSTRUCTION 351,400 340,800
189 WATER MANAGEMENT 433,900 474,700
190 WATER TREATMENT PLANT 1,501,800 1,495,200
191 WASTEWATER MANAGEMENT 945,100 885,700
192 DIRECT EXPENDITURE SUBTOTAL 3,896,600 3,695,400
193 OTHER EXPENSES
194 DEBT SERVICE - WATER 403,800 403,800
195 DEBT SERVICE - WASTEWATER 615,700 603,400
196 RETIREES HEALTH CARE 200,000 200,000
197 OTHER EMPLOYMENT EXPENSES 25,000 10,800
198 PENSION UNFUNDED LIABILITY 339,400 -
199 KENT COUNTY TREATMENT CHARGE 3,524,800 4,030,000
200 INTRAFUND SERVICE FEES 1,233,400 1,458,800
201 OTHER EXPENSES SUBTOTAL 6,342,100 6,706,800
202 TRANSFER TO
203 GENERAL FUND FROM WATER 250,000 250,000
204 GENERAL FUND FROM WASTEWATER 250,000 250,000
205 WATER IMP AND EXT 1,200,000 1,233,200
206 WASTEWATER IMP AND EXT 1,330,000 1,330,000
207 TRANSFER TO SUBTOTAL 3,030,000 3,063,200
208 TOTAL EXPENSES 13,268,700 13,465,400
209 CURRENT YEAR BALANCES
210 CURRENT YEAR BALANCE WATER 1,056,400 658,400
211 CURRENT YEAR BALANCE WASTEWATER 797,100 (98,500)
212 CURRENT YEAR BALANCE KCSA - 155,000
213 CURRENT YEAR BALANCE SUBTOTALS 1,853,500 714,900
214 TOTAL CURRENT YEAR BALANCES AND EXPENSES $ 15,122,200 $ 14,180,300
215 The City Manager is hereby authorized, without further approval of the City Council, to make
216 interdepartmental transfers of up to five percent of the amount hereinafter appropriated to any
217 department with the exception of any transfers prohibited by City Procedure #F306.
218 ADOPTED:
Paj 153
FIRST READING
7 of 10
219 2013-2014 BUDGET ORDINANCES - SECOND AMENDMENT - CONTINUED
220 WATER/WASTEWATER IMPROVEMENT & EXTENSION FUND
221 CASH RECEIPTS/REVENUES AND BUDGET FOR 2013-2014
222 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:
223 The amount hereinafter named aggregating Fifteen Million, Four Hundred Fifty-Four Thousand, Nine Hundr
224 dollars ($15,454,900) or so much thereof as may be necessary are hereby appropriated from current reve
225 and other funds for the use by several departments of the Municipal Government for the fiscal year beginn
226 July 1, 2013 and ending June 30, 2014:
227 CASH RECEIPTS
228 ORIGINAL REVISED
229 2013/14 2013/14
230 BUDGET BUDGET
231 PRIOR YEAR BALANCE - WATER $ 1,620,000 $ 4,473,800
232 PRIOR YEAR BALANCE - WASTEWATER 660,900 2,807,000
233 TOTAL BEGINNING BALANCES 2,280,900 7,280,800
234 RECEIPTS
235 BOND PROCEEDS - WATER - 2013 ISSUE - 3,000,000
236 BOND PROCEEDS - WASTEWATER - 2013 ISSUE - 1,067,900
237 BOND PROCEEDS - WASTEWATER - 2011 ISSUE (DRLP) 62,000
238 ARBITRAGE REBATE - IRS REFUND - 66,000
239 TRANS FROM OPERATING FUND FOR WATER 1,200,000 1,233,200
240 TRANS FROM OPERATING FUND FOR WASTEWATER 1,330,000 1,330,000
241 TRANSFER FROM WATER IMPACT FEE RESERVE 390,000 390,000
242 TRANSFER FROM WASTEWATER IMPACT FEE RESERVE - 1,000,000
243 INTEREST INCOME 25,000 25,000
244 TOTAL RECEIPTS 2,945,000 8,174,100
245 TOTALS $ 5,225,900 $ 15,454,900
246 EXPENSE SUMMARY
247 ORIGINAL REVISED
248 2013/14 2013/14
249 EXPENSES BUDGET BUDGET
250 WATER $ 1,476,800 $ 7,649,700
251 WASTEWATER 1,251,000 5,252,400
252 WATER CONSTRUCTION 90,000 90,000
253 TOTAL EXPENSES 2,817,800 12,992,100
254 CURRENT YEAR BALANCE - WATER 1,655,700 1,402,800
255 CURRENT YEAR BALANCE - WASTEWATER 752,400 1,060,000
256 CURRENT YEAR BALANCE SUBTOTALS 2,408,100 2,462,800
257 TOTALS $ 5,225,900 $ 15,454,900
258 The City Manager is hereby authorized, without further approval of the City Council, to make
259 interdepartmental transfers of up to five percent of the amount hereinafter appropriated to any
260 department with the exception of any transfers prohibited by City Procedure #F306.
261 ADOPTED:
Paj 154
FIRST READING
8 of 10
262 2013-2014 BUDGET ORDINANCES - SECOND AMENDMENT - CONTINUED
263 ELECTRIC REVENUE FUND
264 REVENUES AND BUDGET FOR 2013-2014
265 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:
266 The amount hereinafter named aggregating Ninety-Four Million, Seven Hundred Twenty-Two Thousand,
267 One Hundred dollars ($94,722,100) or so much thereof as may be necessary are hereby appropriated
268 from current revenues and other funds for the use by several departments of the Municipal Government
269 for the fiscal year beginning July 1, 2013 and ending June 30, 2014:
270 ORIGINAL REVISED
271 2013/14 2013/14
272 BUDGET BUDGET
273 BEGINNING BALANCE $ 7,152,400 $ 6,620,900
274 BASE REVENUE
275 DIRECT SALES TO CUSTOMER 76,286,700 78,792,300
276 UTILITY TAX 1,492,200 1,309,300
277 MISCELLANEOUS REVENUE 602,000 579,100
278 RENT REVENUE 251,000 180,000
279 GREEN ENERGY 135,800 130,000
280 INTEREST EARNINGS 119,400 12,000
281 TRANSFER FROM RATE STABILIZATION 4,000,000 7,000,000
282 INTRAFUND SERVICE RECEIPTS WATER/WASTEWATER 98,500 98,500
283 TOTAL REVENUES 82,985,600 88,101,200
284 TOTALS $ 90,138,000 $ 94,722,100
Paj 155
FIRST READING
9 of 10
285 2013-2014 BUDGET ORDINANCES - SECOND AMENDMENT - CONTINUED
286 ELECTRIC REVENUE FUND - EXPENDITURES & BUDGET BALANCE FOR 2013-2014
287 ORIGINAL REVISED
288 2013/14 2013/14
289 EXPENSES BUDGET BUDGET
290 POWER SUPPLY $ 23,832,000 $ 25,977,700
291 SOLAR ENERGY 1,565,800 1,729,200
292 SOLAR RENEWAL ENERGY CREDITS 300,000 352,600
293 POWER SUPPLY MANAGEMENT 996,000 996,000
294 PJM CHARGES - ENERGY 12,812,900 17,274,000
295 PJM CHARGES - TRANSMISSION & FEES 4,740,000 7,420,000
296 CAPACITY CHARGES 15,787,200 15,614,100
297 SUB-TOTAL POWER SUPPLY 60,033,900 69,363,600
298 PLANT OPERATIONS 6,015,800 5,851,600
299 GENERATION FUELS - 1,603,800
300 PJM SPOT MARKET ENERGY (230,500) (1,004,500)
301 PJM CREDITS (397,000) (5,314,800)
302 CAPACITY CREDITS (15,079,800) (15,079,800)
303 GENERATION SUBTOTAL (9,691,500) (13,943,700)
304 POWER SUPPLY & GENERATION SUBTOTAL 50,342,400 55,419,900
305 DIRECT EXPENDITURES
306 TRANSMISSION/DISTRIBUTION 3,302,500 3,776,300
307 ELECTRICAL ENGINEERING 1,192,200 1,285,300
308 ADMINISTRATION 597,000 628,400
309 METER READING 220,300 273,800
310 SYSTEMS OPERATIONS 543,600 675,800
311 DIRECT EXPENDITURE SUBTOTALS 5,855,600 6,639,600
312 OTHER EXPENSES:
313 UTILITY TAX 1,492,200 1,309,300
314 ALLOW FOR UNCOLLECTIBLES 200,000 200,000
315 CONTRACTUAL SERVICES - RFP'S 100,000 100,000
316 RETIREES HEALTH CARE 513,300 513,300
317 OTHER EMPLOYMENT EXPENSES 150,000 125,700
318 TRANSFER TO PENSION UNFUNDED LIABILITY 1,314,200 -
319 OPEB UNFUNDED LIABILITY 975,700 975,700
320 GREEN ENERGY PAYMENT TO DEMEC 135,800 135,800
321 INTRAFUND SERVICE FEES 3,319,400 3,572,700
322 INTEREST ON DEPOSITS 27,000 20,000
323 DEBT SERVICE 3,301,900 3,301,900
324 OTHER EXPENSES SUBTOTAL 11,529,500 10,254,400
325 TRANSFER TO
326 IMPROVEMENT & EXTENSION 5,448,600 4,918,600
327 GENERAL FUND 8,000,000 8,000,000
328 TRANSFER TO SUBTOTAL 13,448,600 12,918,600
329 TOTAL EXPENSES 81,176,100 85,232,500
330 CURRENT YEAR BALANCE 8,961,900 9,489,600
331 TOTALS $ 90,138,000 $ 94,722,100
332 The City Manager is hereby authorized, without further approval of the City Council, to make
333 interdepartmental transfers of up to five percent of the amount hereinafter appropriated to any
334 department with the exception of any transfers prohibited by City Procedure #F306.
335 ADOPTED:
Paj 156
FIRST READING
10 of 10
336 2013-2014 BUDGET ORDINANCES - SECOND AMENDMENT - CONTINUED
337 ELECTRIC UTILITY IMPROVEMENT AND EXTENSION FUND
338 CASH RECEIPTS/REVENUES AND BUDGET FOR 2013-2014
339 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:
340 The amount hereinafter named aggregating Nine Million, Two Hundred Fifty-two Thousand Three Hundre
341 dollars ($9,252,300) or so much thereof as may be necessary are hereby appropriated from current
342 revenues and other funds for the use by several departments of the Municipal Government for the
343 fiscal year beginning July 1, 2013 and ending June 30, 2014:
344 CASH RECEIPTS
345 ORIGINAL REVISED
346 2013/14 2013/14
347 BUDGET BUDGET
348 BEGINNING BALANCE $ 3,091,000 $ 3,868,500
349 RECEIPTS
350 TRANSFER FROM ELECTRIC 5,448,600 4,918,600
351 GENERAL SERVICE BILLING 440,000 440,000
352 INTEREST EARNINGS 25,200 25,200
353 TOTAL RECEIPTS 5,913,800 5,383,800
354 TOTALS $ 9,004,800 $ 9,252,300
355 EXPENSE SUMMARY
356 ORIGINAL REVISED
357 2013/14 2013/14
358 EXPENSES BUDGET BUDGET
359 ELECTRIC GENERATION $ 2,117,800 $ 2,130,000
360 TRANSMISSION AND DISTRIBUTION 1,100,000 1,144,600
361 ELECTRICAL ENGINEERING 2,405,800 2,615,500
362 TOTAL EXPENSES 5,623,600 5,890,100
363 CURRENT YEAR BALANCE 3,381,200 3,362,200
364 TOTALS $ 9,004,800 $ 9,252,300
365 The City Manager is hereby authorized, without further approval of the City Council, to make
366 interdepartmental transfers of up to five percent of the amount hereinafter appropriated to any
367 department with the exception of any transfers prohibited by City Procedure #F306.
368 ADOPTED:
Paj 157
FIRST READING
CITY OF DOVER PROPOSED ORDINANCE #2014-14
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
2 COUNCIL MET:
3 That Appendix D - Downtown Dover Business Improvement District, Article III - Establishment of
4 the Dover Downtown Business Improvement District, Section 3 - Geographic Boundaries, and
5 Section 5 - Management Company of the Dover Code be amended by deleting the text indicated in
6 bold, red, strikeout and inserting the text indicated in bold, blue text, as follows:
7 Section 1. Purpose.
8 The creation of the Dover Downtown Business Improvement District is designed to assist in the
9 revitalization of the city's downtown and adjoining commercial district by providing enhanced
10 municipal services via a commercial property surtax. The district is created pursuant to chapter 15,
11 title 22, Delaware Code (22 Del. C. § 1501 et seq.) (hereafter, the "enabling legislation").
12 Section 2. Establishment.
13 The mayor and council hereby create a business improvement district to be known as the "Dover
14 Downtown Business Improvement District" ("DDBID"), which district shall be bounded, governed
15 and administered in accordance with this appendix D.
16 Section 3. Geographic boundaries.
17 The geographic boundaries of the DDBID shall not exceed the boundaries of the downtown
18 redevelopment target area as defined in aAppendix C [to the Code] - Downtown Redevelopment.
19 (Ord. of 4-10-2006(4))
20 Section 4. Duration of DDBID.
21 [The] city council shall have the right to dissolve the DDBID or change the designation of the
22 management company at any time.
23 Section 5. Management company.
24 [(a) Authorized.] The DDBID shall be governed by the Downtown Dover Partnership, a
25 management company specifically authorized by this ordinance and organized under the
26 not-for-profit corporation provisions of the Delaware General Corporation Law (8 Del.
27 C. § 101 et seq.).
28 (a) [(b)] Certification of incorporation. The city solicitor, as incorporator of the company, shall
29 prepare and cause, or amend, the certificate of incorporation to be filed with the secretary
30 of State of Delaware, which certificate shall include those requirements set forth in 22
31 Del. C. § 1504, as amended.
Paj 158
Proposed Ordinance #2014-14 - Appendix D - Downtown Dover Business Improvement District Page 2
32 (b) [(c)] Membership of company and board of directors. The management company shall be a
33 corporation comprised of a majority representation, but not less than five members or
34 directors respectively who either own a commercial property within the district, or are
35 the designee of such owner., and these directors shall constitute a majority of the
36 board of directors.
37 (c) [(d)] Company reports. The management company shall file with the finance department and
38 with the city clerk a monthly financial report and shall also provide an operating report
39 monthly. The City of Dover shall annually review the performance of the management
40 company and shall prepare for public inspection a report which certifies that the
41 management company is in compliance with its enabling ordinance, its certificate of
42 incorporation and bylaws, and the provisions of this appendix and 22 Del. C. ch. 15 (22
43 Del. C. § 1501 et seq.); the management company is fiscally sound; and the management
44 company has not discriminated against any person based upon race, sex, national origin,
45 religion, age or disability.
46 Section 6. Services.
47 Except as limited by the enabling legislation, the DDBID may use proceeds of the special
48 assessments to provide for the following services, directly or by contract: promotional events,
49 business training and education; streetscape and store design services and assistance; marketing and
50 advertising; economic development; market analysis and planning studies; security services;
51 sidewalk sanitation; [and] downtown signage and lighting.
52 Section 7. Assessment base.
53 The assessment base through which the annual budget of the DDBID shall be funded shall be the
54 real property assessment value as established by city property tax records for the qualified property
55 in the assessment zone.
56 Section 8. Properties exempt from assessment.
57 (a) All exclusively residential properties having not more than four rental units shall be
58 exempt from assessment.
59 (b) All properties which are (i) exempt from the city's real property tax and (ii) owned by
60 either churches or the federal, state or local government shall be exempt from
61 assessment.
62 (c) All assessment appeals shall be taken directly to the management company.
63 Section 9. Method of assessment.
64 (a) The management company shall assess each assessable property within the district by
65 multiplying the total service and improvement cost as reflected in the adopted budget for
66 each year (less any allocated surplus or estimated revenue from other sources) by the
67 ratio of the amount of such assessable property's assessment base to the total amount of
68 the assessment base for all assessable properties in the district or, if the district is divided
69 into assessment zones, in the respective assessment zone, provided that, in all cases, the
Paj 159
Proposed Ordinance #2014-14 - Appendix D - Downtown Dover Business Improvement District Page 3
70 assessment base shall be the one designated in the enabling legislation and this appendix
71 by the city to fund the district; and provided, further, that notwithstanding the above, the
72 management company shall have the power to impose an assessment of a minimum
73 amount.
74 (b) The management company shall by resolution authorize the payment of such assessments
75 annually.
76 (c) All assessments imposed by the management company shall constitute a lien on each
77 property so assessed, the nonpayment of which shall be collectible in the same manner
78 as the collection of a property tax delinquency by the city in which the district lies. No
79 action taken to enforce a claim by the management company for the annual payment shall
80 affect the status of any subsequent installment of the same or the next assessment, each
81 of which shall constitute a lien upon the property.
82 (d) Each year the city assessor shall provide the management company with a list of the
83 assessed values of all properties located within the DDBID which are subject to
84 assessment hereunder, as well as the:
85 (i) Name and address of the owner(s) of each such property; and
86 (ii) The address and parcel number of each such property.
87 (e) There shall be three assessment zones in the district as set forth in the attached map.
88 Zones 1, 2 and 3 shall provide 50 percent, 40 percent and ten percent of the budget
89 assessment.
90 (f) The annual budget and assessment zones shall be established by the management
91 company and submitted to [the] city council for approval on or before the first council
92 meeting in May each year. The budget shall be based on services and improvements
93 authorized by this ordinance and shall be approved by [the] council on or before the
94 second meeting in June. Once the budget is approved by [the] city council, the city
95 assessor shall supply to the management company the necessary information to determine
96 the assessments and assessment rate. The assessment rate shall be approved and accepted
97 by [the] council on or before the second meeting in June each year. The billing and
98 assessment year shall run from July 1 to June 30. Assessment notices shall be mailed on
99 or before the tenth working day of July each year. Assessments not paid by August 1
100 shall bear a penalty of 1½ percent per month.
101 (Ord. of 4-10-2006(5))
102 Section 10. Limitations on authority.
103 The management company shall have all of the powers and authorities described and listed in
104 22 Del. C. § 1504(b), as amended; provided, however, that it shall be prohibited from incurring
105 capital debt and owning real property with funds acquired through the DDBID revenues.
106 ADOPTED: *
107 S:\ORDINANCES\2014\DRAFT\Ordinance #2014-14 Amending Appendix D - Downtown Dover Business Improvement District.wpd
Paj 160
Proposed Ordinance #2014-14 - Appendix D - Downtown Dover Business Improvement District Page 4
108 SYNOPSIS
109 The proposed amendment names the Downtown Dover Partnership as the "management
110 company" for the Business Improvement District and removes the requirement that a
111 majority of the management company's Board of Directors be owners or owners' designees
112 of commercial properties within the Business Improvement District.
113 (SPONSORS: LYNN AND TOWNSHEND)
114 Actions History
115 05/27/2014 - Scheduled for First Reading at Council
116 05/12/2014 - Introduced at the Legislative, Finance, and Administration Committee
Paj 161
CITY OF DOVER
PROPOSED ORDINANCE #2014-05 WITH PC#1 AND C#1
(Planning Commission Amendments Indicated in Yellow Highlight)
(Amendments Proposed by Councilman David Anderson Indicated in Green Highlight)
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL
2 MET:
3 That Appendix B - Zoning, Article 3 - District Regulations, Section 2 - General residence zones (RG-1 and
4 RG-2), Subsection 2.4 - Conditional Uses, of the Dover Code be amended by re-designating existing subsection
5 (d) as subsection (e), and inserting a new subsection (d) to read as follows:
6 (d) Professional offices may be permitted on State Street and Governors Avenue between Water Street
7 and Mary Street, and on Route 8 in its entirety, subject to the following restrictions:
8 (d) Professional offices may be permitted on State Street and Governors Avenue between Water Street and
9 Mary Street, and on Route 8 in its entirety, subject to the following restrictions:
10 i. The office operations shall be conducted in such a manner as to maintain the residential character
11 of the surrounding neighborhood, and no changes or improvements shall be made to the premises
12 which might preclude utilization of the premises for residential purposes in the future.
13 ii. There shall be no other professional office located in the same zoning district within 250 feet of the
14 premises.
15 iii. No display of products or goods shall be visible from the street.
16 iv. There shall be no exterior effects such as noise, traffic, odor, dust, smoke, gas, fumes, radiation, or
17 electromagnetic interference.
18 v. A minimum of two (2) off-street parking spaces shall be required.
19 vi. No more than four (4) off-street parking spaces shall be permitted. Furthermore, all off-street spaces
20 shall be visually screened from adjacent residential uses, to the greatest extent possible, by
21 employing a landscape screen no less than six and one half (6½) feet high, which landscape screen
22 shall be properly maintained throughout the duration of the professional office use on the subject
23 premises.
24 vii. Signage shall be limited to one (1) sign, not to exceed six (6) square feet in area. No sign may be
25 illuminated.
26 viii. The hours of operation shall not commence prior to 6:00 a.m. and shall cease no later than 8:00 p.m.,
27 with no more than six (6) four (4) employees engaged in the operations upon the premises at any
28 given time.
29 ix. The Planning Commission shall have the authority to impose such additional conditions and
30 restrictions as may be necessary or appropriate to protect the general health, safety, and welfare of
31 the residents of surrounding properties.
32 ADOPTED: *
33 S:\ORDINANCES\2014\DRAFT\Ordinance #2014-05 Amending Appendix B - Zoning, Article 3 - District Regulations, Section 2 - General Residence w PC#1 & C#1 Final Reading.wpd
34 SYNOPSIS
35 The proposed ordinance would allow professional offices as a conditional use within the General Residence Zone on
36 State Street and Governors Avenue between Water Street and Mary Street, and on Route 8 in its entirety, subject
37 to a series of restrictions. Under the proposed ordinance, the establishment of such an office would be subject to
38 conditional use approval, which includes a public hearing before the Planning Commission.
39 (SPONSORS: BONAR, HUTCHISON, AND LYNN)
40 Actions History
41 05/27/2014 - Scheduled for Reconsideration at Council
42 05/12/2014 - Public Hearing/Final Reading at Council (Tabled)
43 03/24/2014 - First Reading Held at Council
44 03/10/2014 - Introduced at Parks, Recreation, and Community Enhancement Committee