Yo rale tèks sa a nan PDF la otomatikman, epi li ka gen erè. PDF la se dosye ofisyèl la, kidonk tcheke l anvan ou konte sou sa a.
Paj 1
Bicycle/Pedestrian Subcommittee
Tuesday, March 6, 2018
5:00 PM – 6:00 PM
Large Conference Room – Dover City Hall
DRAFT AGENDA
Agenda
Meeting Minutes of February 2017
Old Items:
1. Dover Treasure Hunt
2. Construction Projects (DelDOT)
3. Bike Fix‐it Station
4. Bike Month Events (Bike to Work day, Ride of Silence)
5. Dover Duathlon – April 14, 2018
New Items
1. Snow Removal
2. BFC Report Card Sub/Subcommittee
3. MPO FY18 Grant
4. Timeline & Milestones – Sub/subcommittee
Announcements
Adjournment
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C.
§10004(E)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS,
INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING.
Paj 2
Dover Bicycle and Pedestrian Subcommittee
History Timeline
Spring 2012 At Delaware Bike Summit, Dover City Planning Director,
Ann Marie Townsend, declares intention for Dover to
become a Bike Friendly Community
April 2, 2013 First meeting of Bike/Ped Subcommittee; Chairman
appointed: Jim Hutchison; First task chosen: Bike
Friendly Community Application
May 2013 First Bike‐to‐Work Day event in Dover
April 23 – July 2, 2013 Prepared & submitted BFC Application (3 months)
November 2013 League of American Bicyclists gives Dover “Honorable
Mention” (= application for Bike Friendly Community
turned down)
February 4 – Oct 7, 2014 Completed Pedestrian Plan (7 months)
Feb 4, ‘14 – March 3, ‘15 Completed Bike Plan (13 months)
May 2016 First Ride of Silence event
August 2015 Concept Design funded for Senator Bikeway
October 2015 Partnership formed with Capital School District
January 2016 Engineering Design for Senator Bikeway, Phase I, is
funded (construction planned for FY 2017)
April 2016 Bike Rack Contest winner is declared (DHS drafting
class)
April 2016 First Dover Duathlon event
Spring 2017 First bicycle education classes in Capitol School District
April 2017 Application for Walk‐Friendly Community turned down
May 2017 First signature Dover bike rack installed, at public
library
November 2017 Awarded Bronze‐level Bike Friendly Community by
League of American Bicyclists
Paj 3
Bicycle Pedestrian Sub‐Committee
Dover City Hall Large Conference Room
Dover, DE
February 6, 2018
***DRAFT***
Members Present: Others Present:
Jim Hutchison‐Chair, Chris Asay, Jayce Lesniewski, Carolyn Courtney, Margery Cyr, Eddie
Dave Moses, Gerry Pennington, Fran Riddle Diaz, John Fiori, Kate Layton,
CALLED TO ORDER: Meeting opened at 5:02 P.M.
Mrs. Cyr was welcomed by the Chair and everyone gave brief introductions.
AGENDA
The agenda was presented for review. With no changes the agenda was accepted as presented.
APPROVAL MEETING MINUTES
The minutes were presented for review. Mr. Fiori noted a typo in the previous minutes, “punch and run” should be
puncheon (first paragraph). No additional edits were made. The motion to approve was made and seconded, passing
without objection.
OLD ITEMS
Dover Treasure Hunt
Mrs. Riddle shared information on the meeting held with Sarah Zimmerman, Kate Layton and Carolyn Courtney. We have
developed a list of folks that would be interested in the project. We are hosting a meeting for brainstorming this idea.
The meeting of this group will be held on February 22 at the Pitts Recreation Center, Schutte Park from at 3 PM. All are
welcomed. Goal to see the interest, talk about how it can take shape and particularly when. We want to pick a date that
is no conflicting and possibly complimentary to another downtown Dover activity.
Mr. Asay, what about the grant application for the event. Mrs. Riddle noted we did not get the America WALKS grant,
which would have pushed our timeline than we were ready to go. We may look into other grant possibilities. We think
the costs of this event will be mainly for signage, we need to get a lot of buy in. It really should not that large, especially
to one organization. We have promoted this as primary sponsors as the: Bike/Ped Subcommittee, First State Heritage
Park, and Restoring Central Dover. We are hoping to get a lot partners that would be interested in sponsoring the (3)
three key organizations.
The chair commented this is a good walking activity to support our pedestrian needs. We have focused on biking so I am
glad to see some pedestrian activities.
Construction Projects
Mr. Fiori reported:
Senator Bikeway – DelDOT will install and maintain the green paint. However, another meeting with the city
officials (City Manager and Public Works leaders) to discuss maintenance of 130 delineators that will be installed
between the cycle track and road. They will be asking the city to install and remove seasonally for winter/snow,
reinstalling in the spring. DelDOT would pay and do the initial installation. Mr. Asay noted this was the first time
he had heard these delineators were removable. He felt this was never mentioned in the public workshops.
There was some discussion on who made the decision to make this decision to take them out in the winter. Mr.
Paj 4
Asay feels this is terrible. Most of the winter this area is is cycleable, by taking out the delineators it will no
longer be a low stress bike route. He wanted to know who made this decision, Century Engineering did not
discuss this option or else I would have had a long discussion with them. Mr. Fiori noted the decision was made
within DelDOT not at Century Engineering. Mr. Moses noted what would be the alternative to taking them out
since leaving them in they will most likely be destroyed by snow plows? More discussion took place on how
other communities handle similar situations. Mr. Fiori noted he would look into what other communities do in
for seasonal issues.
Mr. Asay asked if the engineering out to bid? Mr. Fiori noted he felt final plans were submitted. He would
double check that and update at out next meeting. Still acquiring right‐of‐ways at this time.
West Street Multiuse Pathway
Construction will start in March and the same with Brecknock Park is also starting in March. Mrs. Cyr asked what
is being done at Breacknock. Mr. Fiori responded with finishing the multiuse path from the park to the POW
Parkway is being upgraded to ADA compliance with the stub connector to the gravel path of Brecknock.
Other Pertinent Construction Projects
Mr. Fiori noted the repaving of North Street is being done (sidewalk). Forest Ave. and Saulsbury Rd, we are
anticipating construction in the fall of 2018. US13 widening, preliminary plans were sent out last week,
comments have a due date and currently plans are show a multiuse path on both sides.
Bike Fixit Station
Mrs. Layton shared that Wil Grimes with Restoring Central Dover is able to make the purchase of the fixit station. The
city will have the concrete poured and then install the unit. The intent is to have this in place before Bike to Work Day.
The fixit station will go in near the air pump at the Dover Public Library. Some basic discussion took place.
Bike Month Events
Ms. Courtney reported the Ride of Silence will be held on May 16, 2018. Mr. Siegel was not in attendance to discuss Bike
To Work Day this time.
Dover Duathlon
Ms. Courtney noted registration is open. Process is going smoothly. Mr. Moses offered to donate a bicycle for a “give‐a‐
way item. It is a special Mike Wolf designed bike from 1930’s/40’s replica Antique Archeology bike. He feels this bike is a
collectors item. With discussion, it was agreed each registered participant would receive one (1) ticket for a chance to
win the bike. This will offer will be included on future promotional advertising of the event. Mr. Moses feels the will be
an incentive for those to register for the event. Ms. Courtney noted sponsors are still needed, package information is
available on the web site. The chair felt registration would be good this year, as we have no conflicts with Easter or other
similar events. Everyone was asked to promote the event and consider volunteering the day of the duathlon.
NEW ITEMS
Bicycle Friendly Report Card
The chair asked about the RT13 project, would that come under the category of improving on the bicycle network? Some
of that project falls within city boundaries. That would help us move to Silver category. Note also that the 3rd item on
steps to Silver, consider our previous discussion on low stress networks, Mr. Asay’s point is well taken. We can’t put
something up and not allow it to stay up. We need to be cognoscente of the presenting low stress options. Our projects
should be helping us out a lot. It does really say what we should be shooting for. Mr. Moses noted there are things done
in education that he felt were not highlighted. The chair would like to know what were some of the activities of what
pushed other communities up to a Silver level? Discussion took place on what options could help, possibly even bike
rodeos in the summer with the Restoring Central Dover (play streets) and the Capital School District.
Paj 5
Also bicycle parking was mentioned. Thinking about the bike rack in front of the DPL, then I think about the state
buildings? It was noted bike racks were installed in areas around Dover. Most were well received, however we did have
to remove the post style bike rack on The Green. Mr. Diaz noted residents complained directly to the Mayor, which
filtered down to Public Works, and they were removed from The Green itself. With discussion, Ms. Courtney was asked
to inquire with Legislative Hall to see if a bike rack of some sort could be installed next to state buildings on the legislative
complex area. The chair noted he would also contact someone he Mark Devore at Facilities Management and also
Legislative Council to move this idea forward. We do have some of the hitch post bike racks available that we could
possibly work a partnership out to provide the racks being stored now by the city that are looking for a home.
Mr. Moses feels we need to talk about keeping our foot on gas when it comes to Del State, Wesley, etc, but I don’t see
much lead way there. I want to keep up on this.
The chair asked Ms. Courtney if she could follow up with the LAB about what we can do for improve our level of bike
education and some of the activities are the other communities are doing that we are not.
Ms. Asay noted we ranked high in crashes. Mr. Fiori noted we are bad on crashes statewide. Mr. Asay wanted to know
why they only gave us this report card instead of the booklet they gave us last time? We do not know that answer.
Independence Traffic Control Measures
Mr. Asay noted the State of Delaware put in traffic measures on Independence Blvd. They have added a traffic circle at
one intersection and then bump out and islands in front of the park. Mr. Asay noted he was there taking pictures when
Ms. Courtney came around. Ms. Courtney noted, yes I live her and these traffic calming measures are not something all
of the neighbors wanted. In 25 years of living here, she had never had an issue however, now the stuff at the end of
Lamplighter. When the snow started to melt it piled up, creating a huge ponding that did not exist prior. These measure
collect trash and are causing safety issues with people running the new stop signs. Mr. Asay noted he recalled some
controversy there and that he had heard crash data used was not even for this area. It is noted, it is very unfriendly for
bicycles. It was noted that Rep. Sean Lynn forced this issue on the city. City officials had actually voted part of the project
down. They later agreed to allow the state of put this in. It was paid for by CTF funds of Mr. Lynns. Several citizens had
went to the city to get the project stopped. With discussion, there was not much this committee could really do to
mitigate having these traffic calming measures removed at this point.
ANNOUNCEMENTS
Mr. Asay noted now Lincoln Street has sidewalks (new) from one end to the other. He wanted to know who did that?
We were not aware if this was a city or state project.
ADJOURNMENT
With no further business the meeting adjourned at 6:20 PM without objection.