Bicycle/Pedestrian Subcommittee
Tuesday, April 3, 2018
5:00 PM – 6:00 PM
Large Conference Room – Dover City Hall
DRAFT AGENDA
Agenda
Meeting Minutes of March 2018
New Items
1. Open Streets Program
Old Items:
1. Dover Treasure Hunt
2. Construction Projects (DelDOT)
3. Bike Month Events (Bike to Work day, Ride of Silence)
4. Dover Duathlon – April 14, 2018
Announcements
Adjournment
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C.
§10004(E)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS,
INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING.
Paj 3
Private Development &
the Senator Bikeway
Existing Conditions, Paths to be Constructed, and Gaps
to be Filled
Paj 4
Background: Expanded
Requirements for Sidewalk and
Multi-Use Path Construction
Starting in Spring 2017, DelDOT began requiring 10-foot
wide multi-use paths to be constructed as part of
approval for development projects in State Level 1
Investment Areas. Previously only 5-foot wide sidewalks
were required.
Dover followed by passing an ordinance package in
October 2017 (#2017-12) which included a revamp of
the Zoning Ordinance’s sidewalk regulations. Under the
new ordinance, the Planning Commission could request
multi-use path instead of sidewalk in service of an
adopted Bicycle or Pedestrian Plan.
Paj 5
Background: Involved Projects
Area of
proposed
developments
Senator Bikeway to run 3.5 miles from Dover High School to DuPont Highway (Rt. 13)
First proposed as part of Dover’s 2015 Bicycle Plan
Two possible routes between Dover Central Middle School and DuPont Hwy
Paj 6
Background: Involved Projects
Capital Station project approved by Planning Commission in June 2017; has
submitted plans for Final Approval
65,000 square feet (SF) of retail and restaurant space, including a 21,998 SF Aldi
grocery store
Paj 7
Background: Involved Projects
Lidl project originally approved by Planning Commission in July 2016; returned
with new plan in March 2018 but withdrew application
36,185 SF grocery store, later revised to 25,400 SF with 7,500 SF separate
retail building
Paj 8
Background: Involved Projects
Wells Fargo project approved as Administrative Site Plan by Planning Office in
August 2017, currently under construction
No change to size of existing building; parking and circulation improvements only
NOT required to upgrade to multi-use path, as DelDOT entrance approval was not
needed
Paj 9
Kings Highway Area
Existing Conditions
H wy
nt
po
BIKEABLE
SHOULDERS
EDGEHILL
CVS
N S
Du
Feet
0 175 350 700
BIKE LANE
WELLS EASTOVER
FARGO HILLS
W
hit
e
Oa
kR
Hwy
N D u pont
d
CAPITAL STATION
p SITE
Ma
LOAN
P
TIL
LIDL GROCERY
le
PAYDAY kw
SITE ADULT ST. JONES
y
PROBATION SUBSTATION
AND (COD)
PAROLE Dr
Hwy Park
Kings
LUTHER
TOWERS
MEMORIAL PARK
Mill Dr
visio
E Di
Lewis
n St
SILVER LAKE
PARK
EXISTING TRAIL
Dela t Ave
Ken
CENTRAL MIDDLE SCHOOL w ar e
Ave
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID,
IGN, and the GIS User Community
Paj 10
Kings Highway Area
Senator Bikeway
n t Options
H wy
po
EDGEHILL
CVS
N S
Du
Feet
0 175 350 700
EASTOVER
HILLS
W
hit
e
Oa
kR
Hwy
N D u pont
d
CAPITAL STATION
p SITE
Ma
P
LIDL GROCERY
le
kw
SITE
y
SENATOR BIKEWAY
Dr
OPTION #1 Hwy Park
Kings
LUTHER
TOWERS
Mill Dr MEMORIAL PARK
visio
E Di
Lewis
SENATOR BIKEWAY
n St OPTION #2
SILVER LAKE
PARK
Dela
w ar e
Ave t Ave
Ken
CENTRAL MIDDLE SCHOOL
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID,
IGN, and the GIS User Community
Paj 11
Kings Highway Area
Private Path
Development
n t H wy
po
EDGEHILL Du
CVS N S
Feet
0 175 350 700
REQUIRED
MULTI-USE PATHS
EASTOVER
HILLS
W
hit
e
Oa
kR
Hwy
N D u pont
d
CAPITAL STATION
p SITE
Ma
P
LIDL GROCERY
le
kw
SITE
y
SENATOR BIKEWAY
Dr
OPTION #1 Hwy Park
Kings
LUTHER
TOWERS
Mill Dr MEMORIAL PARK
visio
E Di
Lewis
SENATOR BIKEWAY
n St OPTION #2
SILVER LAKE
PARK
Dela
w ar e
Ave t Ave
Ken
CENTRAL MIDDLE SCHOOL
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID,
IGN, and the GIS User Community
Paj 12
Kings Highway Area
Post-Construction
n t Gaps
Hw
y
po
EDGEHILL Du
CVS
N S
Feet
0 175 350 700
EASTOVER
HILLS
W
hit
e
Oa
kR
Hwy
N D u pont
d
CAPITAL STATION
p
SITE
Ma
P
LIDL GROCERY
le
kw
SITE
y
Dr
Hwy Park
Kings
LUTHER
TOWERS
Mill Dr MEMORIAL PARK
visio
E Di
Lewis
n St
SILVER LAKE
PARK
Dela
w ar e
Ave t Ave
Ken
CENTRAL MIDDLE SCHOOL
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID,
IGN, and the GIS User Community, Surdex Corp, 2017
Paj 13
Detail- North DuPont
Highway and
Kings Highway
N
Feet
0 45 90 180
Issues:
-No path developed on Loan-Til-Payday Site
-Must use 3 crosswalks to reach bikeable shoulder on south side of White Oak Road
-No bikeable shoulder on north side of White Oak Road until Halsey Road Surdex Corp, 2017
Paj 14
Detail- North DuPont
Highway and
Division Street
N
Feet
0 45 90 180
Issues:
-No crosswalk across DuPont on north side of intersection
-No bikeable shoulders on Division Street until John Hunn Brown Road
Surdex Corp, 2017
Paj 15
Detail- Division Street
and Park Drive
N
Feet
0 45 90 180
Issues:
-Narrow Right-of-Way
-Power poles are close to street and cannot be moved
Surdex Corp, 2017
Paj 16
Next Steps
Determine which of two possible routes is better
Make intersection improvements at DuPont
highway for crossing of selected route
If Division Street route is selected, design path
and acquire right-of-way so that St. Jones
Substation operations are not impacted