Yo rale tèks sa a nan PDF la otomatikman, epi li ka gen erè. PDF la se dosye ofisyèl la, kidonk tcheke l anvan ou konte sou sa a.
Paj 1
Bicycle Pedestrian Sub‐Committee
Dover City Hall Large Conference Room
Dover, DE
May 8, 2018
*** Approved, June 19, 2018 ***
Members Present: Others Present:
Chris Asay, Jayce Lesniewski, Dave Moses, Gerry Carolyn Courtney, Eddie Diaz, John Fiori,
Pennington, Fran Riddle, Andy Siegel Margie Cyr
CALLED TO ORDER: Meeting opened at 5:04 P.M.
AGENDA
The agenda was presented for review. Ms. Courtney asked to remove the meeting minutes from April they are not ready
for today’s meeting. With that change the agenda was accepted without objection.
NEW ITEMS
Private Development & Senator Bikeway
Mr. Diaz gave a brief overview of the Capital Station development and Senator Bikeway tie‐in. (Presentation attached).
Why are private developments are required to build multiuse pathway? This was started by DelDOT in 2017, as part of
their state level project approvals. This prompted changes in what I show you today and well Dover made their own
changes so that we have a similar policy when it was needed. Latest route of the Senator Bikeway, route runs east to
west and how do we cross over RT13 to head further east. The Capital Station project was reviewed. Discussion on what
is going into the new shopping center. This does not include south west corner property at King Highway and Rt13. The
Chinese restaurant still needs to come down. The Wells Fargo and Parole building will be staying. Mr. Asay questioned
why the bank does not have make changes? Mr. Diaz noted with there is not enough right‐a‐way in front of the bank,
they are not installing the 10’ wide pathway due to property frontage that is available. They are not changing the
location of number of entrances since they are not involved with the new project coming. The Wells Fargo parking lot
does not change. Mr. Diaz reviewed the remaining pieces of the project and frontage issues noting where the gaps are.
Three major ones, White Oak Road where paving site is not being developed, the Capital Station Project and the N. Little
Creek project about development of this site, to encourage redevelopment DelDOT agreed not require intersection
changes here. And the third gap is the city own substation. Gaps were demonstrated in the slides. At Dupont and Kings
Highway, here the issue is the Payday site is not being developed. To get to the bikeable shoulder on the South side of
White Oak, one would need to do three crosswalks while the more direct route would be to go straight across. It would
take serious public action for this to be fixed. We would need to address this another way. Mr. Siegel noted this should
be fine, but we need to be sure we can get them to the existing crosswalks.
Mr. Lesniewski asked if the Lidl still coming? Mr. Diaz replied that it is not moving forward at this point, they have
withdrawn their application.
In review of the last site, we are really not going to see any development in the future and the utility pole along this area
would be extremely costly to move. Each pole could cost close to a million dollars to move so they are not going
anywhere. Discussion took place about the various right‐of‐ways and how we could get the pathway built filling in these
gaps. Mr. Diaz was thanked for his time and presentation.
Paj 2
By‐Laws Review
Ms. Cyr shared that Ms. Courtney came to Mr. Hutchsion and her regarding a revision to the by‐laws. My response was, if
we are going to look, lets look at them as whole as they are 5 years old now. My question to Mr. Hutchsion was to see if
a smaller group could work on them rather than this body as a whole. With brief discussion it was noted Mr. Lesniewski
offered to assist in the project. Ms. Courtney will coordinate calendars to move this forward. We will add to next months
agenda to see where we are in the process.
OLD ITEMS
Dover Treasure Hunt
Mrs. Riddle shared the update we are moving forward with a date of July 20, 2019. We are still in early stages but we are
moving along nicely. The next meeting is May 24 at the Library at 3 pm. We plan on having monthly meetings for the
smaller work groups and over all meetings to coordinate the smaller group activities.
Construction Projects
Mr. Asay asked about the workshop on the RT10 project? Mr. Fiori did not have an update for this meeting.
Bike Fixit Station
Ms. Courtney reported city staff was meeting to discuss the concrete pad and exact location at the library. It is still
coming but not in time for Bike to Work Day.
Bike Month Events
Mr. Siegel continues his plan to ride in from Dover High School (former site). Donations were being solicited for the
breakfast. Mr. Fiori noted DelDOT had a group of riders planning to come and they would have their tent set up with Bike
Month t‐shirts for participants. Mr. Siegel has sent out notices to all the city employees including the library and police
station. Mrs. Cyr asked for a reminder so they be sure to have a door open for us.
Ms. Courtney reported the Ride of Silence is scheduled for that same evening, May 16. We do have police escort
scheduled as typical for this event. Mr. Siegel reminded everyone helmets are required for these event.
Mr. Fiori noted the Legislators Ride is tomorrow.
Dover Duathlon
Ms. Courtney noted we had 65. Great age group of people participating in and in volunteers. Event was successful. There
is some discussion on next year’s date. As we had decided to host this event the 2nd Saturday of April, however it has
been brought to our attention due to the Coastal Running Festival. We will address the date of the 2019 at another time
after some discussion. It was recommended to stay away from Easter weekend. Potentially, April 6 would be the best
date. Everyone was asked to look into other events and report back things that felt would be of major conflict.
ANNOUNCEMENTS
No announcements.
ADJOURNMENT
With no further business the meeting adjourned at 6:10 PM without objection.
Paj 3
Private Development &
the Senator Bikeway
Existing Conditions, Paths to be Constructed, and Gaps
to be Filled
Paj 4
Background: Expanded
Requirements for Sidewalk and
Multi-Use Path Construction
Starting in Spring 2017, DelDOT began requiring 10-foot
wide multi-use paths to be constructed as part of
approval for development projects in State Level 1
Investment Areas. Previously only 5-foot wide sidewalks
were required.
Dover followed by passing an ordinance package in
October 2017 (#2017-12) which included a revamp of
the Zoning Ordinance’s sidewalk regulations. Under the
new ordinance, the Planning Commission could request
multi-use path instead of sidewalk in service of an
adopted Bicycle or Pedestrian Plan.
Paj 5
Background: Involved Projects
Area of
proposed
developments
Senator Bikeway to run 3.5 miles from Dover High School to DuPont Highway (Rt. 13)
First proposed as part of Dover’s 2015 Bicycle Plan
Route between Silver Lake Park and Rt. 13 not yet determined
Paj 6
Background: Involved Projects
Capital Station project approved by Planning Commission in June 2017; has
submitted plans for Final Approval
65,000 square feet (SF) of retail and restaurant space, including a 21,998 SF Aldi
grocery store
Paj 7
Background: Involved Projects
Lidl project originally approved by Planning Commission in July 2016; returned
with new plan in March 2018 but withdrew application
36,185 SF grocery store, later revised to 25,400 SF with 7,500 SF separate
retail building
Paj 8
Background: Involved Projects
Wells Fargo project approved as Administrative Site Plan by Planning Office in
August 2017, currently under construction
No change to size of existing building; parking and circulation improvements only
NOT required to upgrade to multi-use path, as DelDOT entrance approval was not
needed
Paj 9
Kings Highway Area
Existing Conditions
H wy
nt
po
BIKEABLE
SHOULDERS
EDGEHILL
CVS
N S
Du
Feet
0 175 350 700
BIKE LANE
WELLS EASTOVER
FARGO HILLS
W
hit
e
Oa
kR
Hwy
N D u pont
d
CAPITAL STATION
p SITE
Ma
LOAN
P
TIL
LIDL GROCERY
le
PAYDAY kw
SITE ADULT ST. JONES
y
PROBATION SUBSTATION
AND (COD)
PAROLE Dr
Hwy Park
Kings
LUTHER
TOWERS
MEMORIAL PARK
Mill Dr
visio
E Di
Lewis
n St
SILVER LAKE
PARK
EXISTING TRAIL
Dela t Ave
Ken
CENTRAL MIDDLE SCHOOL w ar e
Ave
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID,
IGN, and the GIS User Community
Paj 10
Kings Highway Area
Private Path
Development
n t H wy
po
EDGEHILL Du
CVS N S
Feet
0 175 350 700
REQUIRED
MULTI-USE PATHS
EASTOVER
HILLS
W
hit
e
Oa
kR
Hwy
N D u pont
d
CAPITAL STATION
p SITE
Ma
P
LIDL GROCERY
le
kw
SITE
y
Dr
Hwy Park
Kings
LUTHER
TOWERS
Mill Dr MEMORIAL PARK
visio
E Di
Lewis
n St
SILVER LAKE
PARK
Dela
w ar e
Ave t Ave
Ken
CENTRAL MIDDLE SCHOOL
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID,
IGN, and the GIS User Community
Paj 11
Kings Highway Area
Post-Construction
n t Gaps
Hw
y
po
EDGEHILL Du
CVS
N S
Feet
0 175 350 700
EASTOVER
HILLS
W
hit
e
Oa
kR
Hwy
N D u pont
d
CAPITAL STATION
p
SITE
Ma
P
LIDL GROCERY
le
kw
SITE
y
Dr
Hwy Park
Kings
LUTHER
TOWERS
Mill Dr MEMORIAL PARK
visio
E Di
Lewis
n St
SILVER LAKE
PARK
Dela
w ar e
Ave t Ave
Ken
CENTRAL MIDDLE SCHOOL
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID,
IGN, and the GIS User Community, Surdex Corp, 2017
Paj 12
Detail- North DuPont
Highway and
Division Street
N
Feet
0 45 90 180
Issues:
-No path developed on Loan-Til-Payday Site
-Must use 3 crosswalks to get from Loan-Til-Payday to bikeable shoulder on south side of White Oak Road, and vice versa
-No bikeable shoulder on north side of White Oak Road until Halsey Road and
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN,
the GIS User Community, Surdex Corp, 2017
Paj 13
Detail- North DuPont
Highway and
Division Street
N
Feet
0 45 90 180
Issues:
-No crosswalk across DuPont on north side of intersection
-No bikeable shoulders on Division Street until John Hunn Brown Road
Surdex Corp, 2017
Paj 14
Detail- Division Street
and Park Drive
N
Feet
0 45 90 180
Issues:
-Narrow Right-of-Way
-Power poles are close to street and cannot be moved
Surdex Corp, 2017
Paj 15
Next Steps
Determine which route(s) are desired to access
DuPont Highway from Silver Lake Park
Make intersection improvements at DuPont
highway for crossing of selected routes
If Division Street route is selected, design path
and acquire right-of-way so that St. Jones
Substation operations are not impacted
If either major private project does not reach
completion, plan to fill additional gaps left by it