Yo rale tèks sa a nan PDF la otomatikman, epi li ka gen erè. PDF la se dosye ofisyèl la, kidonk tcheke l anvan ou konte sou sa a.
11 paj pa gen anpil tèks ou ka li isit la, oswa yo pa gen ditou, souvan paske se eskanè oswa desen. Gade PDF la pou sa yo.
Paj 1
REGULAR COUNCIL MEETING
The Regular Council Meeting was held on November 22, 2010 at 7:30 p.m. with Council
President Hogan presiding. Council members present were Mr. Bonar, Mrs. Russell, Dr.
McGlumphy, Mr. Leary, Mr. McGiffin, Mrs. Williams, Mr. Salters, and Mr. Ruane.
Council staff members present were Police Chief Hosfelt, Ms. Russell, Mrs. Mitchell,
Mrs. Townshend, Fire Chief Christiansen, Mr. DePrima, City Solicitor Rodriguez, and
Mrs. McDowell. Mayor Carey was also present.
OPEN FORUM
The Open Forum was held at 7:15 p.m., prior to commencement of the Official Council Meeting.
Council President Hogan declared the Open Forum in session and reminded those present that
Council was not in official session and could not take formal action.
There was no one present wishing to speak during the Open Forum.
The invocation was given by Chaplain Dixon, followed by the Pledge of Allegiance.
AGENDA ADDITIONS/DELETIONS
Council President Hogan requested the deletion of Item #9 - Election of Officers, Robbins Hose
Company - Year 2011 Fire Line Officers, and noted that the matter will be considered during the
Regular Council Meeting of December 13, 2010.
Dr. McGlumphy moved for approval of the agenda, as amended, seconded by Mrs.
Williams and unanimously carried.
Mrs. Russell requested that Item #5A - Review of Active Recreation Plan - Bayard Plaza be
removed from the consent agenda. Dr. McGlumphy requested that Item #6B - b-2 - Ordinance
#2010-30 - Budget Amendments and Item #6D - Approval of Library Funding Plan Transfers
and Use of Green Energy Rate Revenue be removed from the consent agenda.
Mrs. Williams moved for approval of the consent agenda, as amended, seconded by Mr.
Bonar and carried by a unanimous roll call vote.
ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF NOVEMBER 8, 2010
The Minutes of the Regular Council Meeting of November 8, 2010 were unanimously
approved by motion of Mrs. Williams, seconded by Mr. Bonar and bore the written
approval of Mayor Carey.
PRESENTATIONS - 2010 MAYOR=S PRAYER BREAKFAST CONTRIBUTIONS
Mayor Carleton E. Carey, Sr. reminded members that each year proceeds from the Mayor=s
Prayer Breakfast are donated to various organizations. Mayor Carey announced that this year=s
proceeds totaled $2,200, and he presented donations, as follows:
Calvary Baptist Church - Youth Program
Mayor Carey presented a donation in the amount of $300 to Reverend John Moore, of Calvary
Baptist Church, for the Youth Program.
Paj 2
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 2
Elizabeth W. Murphey School
Mayor Carey presented a donation in the amount of $400 to Mr. Mike Kopp of the
Elizabeth W. Murphey School.
United Service Organizations (USO) of Delaware
Mayor Carey presented a donation in the amount of $500 to Ms. Joan Cote of the United Service
Organizations (USO) of Delaware.
Dover Interfaith Mission
Mayor Carey presented a donation in the amount of $1,000 to Ms. Jeanine Kleimo of the
Dover Interfaith Mission.
Mayor Carey thanked all those who participated in this year=s Annual Mayor=s Prayer Breakfast,
noting that there was a total of 412 attendees. He also thanked the Sheraton Inn for the
outstanding service provided for the event.
PUBLIC HEARING - VIOLATION OF DANGEROUS BUILDING ORDINANCE -
35 N. NEW STREET, OWNER OF RECORD - HOUSE OF PRIDE
A public hearing was duly advertised for this time and place to consider a violation of the
Dangerous Building Ordinance for 35 N. New Street, owned by House of Pride. Mr. Scott
Koenig, Public Services Manager/Director of Public Works, advised members that the property
was damaged by a fire in 2002 and that no repairs have been made since. He stated that, in
January 2003 the building was condemned, and in 2007, the building was registered as a vacant
building and has remained vacant. Mr. Koenig stated that the City issued a demolition permit in
January 2008; however, the owner has not taken action to demolish the building. He stated that
the Code Enforcement Division performed an interior inspection of the structure in September
2010 and determined that several windows were not secure and were open to the elements.
These windows were subsequently boarded by the property owner. On October 27, 2010, the
Fire Marshal=s Office and Code Enforcement Division performed an inspection of the building
and identified a number of structural concerns with the interior walls, flooring, and foundation.
In addition, the Fire Marshal=s Office determined that the building was being used for storage in
excess of what is permitted under the fire code for residential use. He advised members that the
property has been the subject of numerous code violations for junk, debris, and tall grass and
weeds.
Mr. Koenig presented slides (Exhibit 1) depicting the condition of the structure. Staff
recommended that City Council:
1) Declare this accessory building dangerous;
2) Order the property to be repaired or demolished by December 22, 2010 by
the owner or equity owner at their own risk;
3) Order the Building Inspector to cause the repair or demolition of the
structure if not completed by the owner within ten (10) days of the date set by
Council; and
Paj 3
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 3
4) Order the City Manager, with the assistance of the City Solicitor, to cause
the cost of repairs or demolition to be charged against the land on which the
building exists as a municipal lien or cause such cost to be added to the tax
duplicate as an assessment, or to be levied as a special tax, or to be recovered in a
suit at law against the owner.
Council President Hogan declared the public hearing open. There being no one present wishing
to speak during the public hearing, Council President Hogan declared the public hearing closed.
Mr. Leary moved that the structure located at 35 N. New Street be declared a dangerous building
and subject to demolition, as recommended by staff. The motion was seconded by Mr. Bonar.
Responding to Mr. Salters, Mrs. Ann Marie Townshend, Director of Planning and Community
Development, advised members that staff conducted inspections on other properties owned by
the House of Pride and identified several corrections that are required. She stated that the
House of Pride is moving forward with the corrections; however, she noted that there is another
property that is vacant and in a condition similar to the subject property. If progress is not made
in the near future on the other property, staff will take appropriate action in declaring this
property dangerous as well.
In response to Mr. Salters regarding recouping the City=s expenses, Mrs. Townshend stated that
unpaid fines are submitted to collections. She noted that demolition expenses are placed as a lien
against the property, which the City would recoup upon the sale of the property. Mr. Koenig
stated that if a property goes to sale and the liens exceed the offer, the offer is brought to the City
for acceptance of the reduced amount or deferment. Mr. DePrima stated that the City cannot
bring a property to sheriff=s sale based on the lien alone and the only venue would be a tax sale.
He stated that the City is expediting a tax sale in an attempt to recoup monies due to the City for
those properties with liens and arrears on their property taxes. Mr. DePrima reminded members
that non-profit organizations, such as House of Pride, typically apply to have their taxes waived
and questioned whether liens are being placed on non-profit owned properties. He stated that the
City may want to investigate this matter and decide whether or not to continue waiving fees for
non-profit owned properties.
Mr. Bonar moved for a call for the question, seconded by Mrs. Williams and carried, with
Dr. McGlumphy voting no.
On a call for the question, the motion to: 1) declare the accessory building located at
35 N. New Street dangerous; 2) order the property to be repaired or demolished by
December 22, 2010 by the owner or equity owner at their own risk; 3) order the
Building Inspector to cause the repair or demolition of the structure if not completed by
the owner within ten (10) days of the date set by Council; and 4) order the City Manager,
with the assistance of the City Solicitor, to cause the cost of repairs or demolition to be
charged against the land on which the building exists as a municipal lien, or cause such cost
Paj 4
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 4
to be added to the tax duplicate as an assessment, or to be levied as a special tax, or to be
recovered in a suit at law against the owner, as recommended by staff, was carried by a
unanimous roll call vote.
PUBLIC HEARING - SALE OF DOVER PUBLIC LIBRARY (45 S. STATE STREET
AND ASSOCIATED PARKING LOT)
In accordance with the City=s Procedure for the Sale and Disposition of Real Property, a public
hearing was set for this time and place to consider the sale of the Dover Public Library and the
associated parking lot at 45 S. State Street.
Mr. Anthony DePrima, City Manager, advised members that the Procedure for the Sale and
Disposition of Real Property includes a three (3) step process. He explained that Step 1 was
completed when the Legislative, Finance, and Administration Committee recommended disposal
of the property during their meeting of September 13, 2010 and Council=s intent to sell the
property was advertised. Mr. DePrima stated that Step 2 requires advertising pertinent
information in a local paper once a week for two (2) weeks and that ads were placed in the Dover
Post on Wednesday, November 10, 2010 and Wednesday, November 17, 2010. He stated Step 3,
which requires that a public hearing be held for the purpose of taking public comment on the
sale, will be completed this evening. Mr. DePrima indicated that, according to the Procedure,
after considering public comments and the public record, Council will determine whether it is in
the best interest of the City to sell the property, have it rezoned, and request an opinion from the
City Manager regarding the recommended method of sale and level of advertising.
Members were reminded that funds from the sale of the current Dover Public Library Building
and the associated parking area are planned for use in the construction of the new Dover library.
During the November 8, 2010 Legislative, Finance and Administration Committee meeting, it
was reported that no City Departments have a need for the property.
Staff recommended that, following the public hearing, Council: 1) find it in the best interest of
the City to dispose of the property through sale or long term lease; 2) request that the City
Manager and City Planner obtain the necessary zoning and planning approvals for rezoning,
minor subdivision, alley abandonment, and possible variances to prepare the property for sale or
lease; and 3) request that the City Manager provide Council with a recommendation regarding
whether an appraisal is necessary, the method of sale, and the degree and scope of advertising.
In response to Mr. Ruane, Mr. DePrima stated that the property is currently zoned RGO
(Residential and General Office) and that it may be more appropriate to rezone the property as
Commercial/Professional Office or Institutional Office. In addition, he stated that in order to
prepare the site for sale, it will be necessary to prepare a minor subdivision\lot line adjustment to
place the library and parking lot on one parcel and annex the Carriage House to the 5 East Reed
Street property, for which variances may or may not be needed. Mr. DePrima also noted that the
paper alley which extends through the property must be abandoned.
Paj 5
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 5
Responding to Mr. Ruane regarding an appraisal of the property, Mr. DePrima stated that the last
step in the process will be to request that the City Manager provide Council with a
recommendation regarding whether an appraisal is necessary, the method of sale, and the degree
and scope of advertising. He stated that an appraisal is not required, according to the procedure.
Council President Hogan declared the public hearing open.
Prior to public testimony, Council President Hogan noted the receipt of a letter submitted by the
Greater Dover Committee which was read into the record, as requested, by Council President
Hogan (Exhibit #2).
Reverend John Moore, Youth Pastor at Calvary Baptist Church (resides at 216 Fieldbrook Drive
in Magnolia), stated that he has worked with children aged 3-17 for the past 10 years. He
relayed the importance of education for children and noted the crippling effects of illiteracy on
society. Reverend Moore expressed his pride that each high school senior in his ministry has
gone to college. He noted that, although many of these children could be considered "at risk" or
in need of "special education," he has found that once their minds are engaged and learning
begins, children gain confidence. Reverend Moore indicated that the first 1,000 days of a child=s
life are critical, since 85% of an individual=s personality is created during this time. He stated
that the public library is a tremendous resource for providing education. Reverend Moore noted
the critical importance of the Dover Public Library, as follows: 1) it provides resources typically
not found in the home; 2) many children do not have computers or technology at home to
conduct research; and 3) it provides an opportunity for children to broaden their minds. He
reiterated his gratitude for the work of Dover=s Public Library.
Ms. Jeanine Kleimo, Chair of Dover Interfaith Mission for Housing (resides at 79 Vining Run in
Camden), stated that she deals with men everyday who have been deprived of education, are
searching for work, and are welcomed at the Dover Public Library. These men are sent daily to
search for employment, learn to utilize computers, and be encouraged to think of themselves as
regular citizens of the community who have access to the public facilities offered by the
City of Dover. She advised members that approximately 90 shelter guests have obtained
full-time employment this past year. She noted that the library has been a critical resource for
shelter residents in their search for employment and urged support of the Dover Public Library.
Ms. Lisa Chase, 110 N. Fairfield Drive, concurred with the comments made by Reverend Moore
and noted that approximately 1/3 of the first 1,000 days of her children=s lives were spent at a
public library. In 2002, upon moving to Dover, she stated that one (1) of the first things she did
was visit the Dover Public Library to obtain library cards. She stated that her family spends
several days at the library each week. It was Ms. Chase=s opinion that the Dover Public Library
is the greatest asset of the City of Dover (and Central Delaware) and is her family=s favorite
place to be. She expressed the critical need for a new facility and urged members= support.
Ms. Connie Myers, 14-B Seskinore Court, requested members to support the measure, noting
Paj 6
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 6
that the library needs Council=s support.
Mr. Jim Stewart, Member of the Executive Committee for the Dover Public Library
(742 Bicentennial Boulevard) explained that the sale of the Dover Public Library at 45 S. State
Street is the first of several measures that will be required to keep the library project moving
forward. He stated that stopping the project now would be premature and requested that
members consider the amount of funds already committed by the State, private organizations,
and other funding sources. Mr. Stewart urged members to approve the requested sale and
support the other measures to bring the new library to fruition.
Mr. Phil Martino, Vice-President of the Capital School Board of Education (resides at
370 Stonewater Way, Dover), relayed the Board=s support for the sale of the library to ensure
adequate funds for the library project. With current State testing being converted to
computerized format, he noted that schools do not have an adequate number of computers and
felt that the new library facility would aid students in this regard.
Mr. Fred Kaltreider, 2 Rodney Road, congratulated the City of Dover on careful planning for the
construction and financing of the new anchor library. With most of the funds already acquired,
he felt it would be easier for the fundraising committee to finish their job if Council signals their
commitment by moving forward with the project.
Mr. Jim Flood, 89 Laurel Drive, stated that there will always be a need for a basic source of
information and that the new library will serve as this source. In addition, he felt that the new
library would benefit the City economically and urged members to support the sale.
Mr. N.C. Vasuki, 235 Carnoustie Road, stated that upon arriving in Dover in 1961, the
Dover Public Library was one of the first places he visited. Since that time, he has seen the use
of the library increase and stated that the support of Council would be helpful in making the new
library a reality.
Mr. Tom Worley, 248 Meadow Drive, stated that there is a need for a new library in order to
meet demand, and indicated his support for the project. He relayed the importance of a good,
vigorous library when executives and managers of companies consider a new business location.
He encouraged members to declare the library surplus and move forward with the new library.
Ms. Nicole Colbert, 303-A West Loockerman Street, stated her support for the measure to
declare the Dover Public Library as surplus in order to move forward with the new anchor
library project. She stated that her family utilizes the library each day and that the library
provides a safe place in Dover for her teenagers to go. She felt that the library provides a means
for individuals to be exposed to positive influences during a time when negativity prevails.
Mr. Ruane moved to approve staff=s recommendation that Council: 1) find that it is in the
best interest of the City to dispose of the property located at 45 S. State Street (and
Paj 7
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 7
associated parking lot) through sale or long term lease; 2) request that the City Manager
and City Planner obtain the necessary zoning and planning approvals for the rezoning,
minor subdivision, alley abandonment, and possible variances to prepare the property for
sale or lease; and 3) request that the City Manager provide City Council with a
recommendation as to whether an appraisal is necessary, the method of sale, and the
degree and scope of advertising. The motion was seconded by Mr. Salters and carried by a
unanimous roll call vote.
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE
REPORT - NOVEMBER 8, 2010
The Parks, Recreation, and Community Enhancement Committee met on November 8, 2010 with
Chairwoman Russell presiding.
Review of Active Recreation Plan - Bayard Plaza (Corner of W. Loockerman Street and
S. Governors Avenue)
Ms. Janelle Cornwell, Planner II, reviewed the detailed information provided to members
regarding the Recreation Plan for Bayard Plaza. She noted that Bayard Plaza is being reviewed
as a Site Development Plan and that the subject property consists of a parcel of land totaling
0.635+/- acres. The Site Plan is to permit the construction of a 54,998 S.F. mixed use building
with 48 residential units on floors 2 through 5 and retail space on the first floor. The residential
units consist of apartments.
Ms. Cornwell stated that, as part of the Site Plan review process for this project, the applicant has
prepared a Conceptual Recreation Plan, which illustrates how the Bayard Plaza development will
provide recreation amenities in accordance with the design specifications described in
Article 5, Section 10 of the Zoning Ordinance. The Plan indicates that 1,593 S.F. of land would
be reserved as active recreation area in central locations on the site. She stated that the proposed
amenities include a 751 S.F. multipurpose community room on the first floor of the building and
a 842 S.F. picnic area with picnic tables and a grill behind the building. She reviewed
information from the submitted plan (dated October 1, 2010) for the active recreation area to be
constructed, as follows:
Required
Active Recreation Area 75 S.F. per dwelling unit Provided
Multipurpose on Plan
community room,
(Article 5 §10.515) 48 DU = 3,600 S.F. picnic area with 2 picnic tables and
Requires 3,600 S.F. grill = total of 1,593 S.F.
Active Recreation Amenities Accessible Located on first floor of the
(Article 5 §10.15) development.
Active Recreation Amenities Age Oriented to development Multipurpose room; picnic area with
(Article 5 §10.15) grills and picnic tables.
Parking Onsite parking provided for most
dwelling units. A parking lot with
46 spaces is located on the site.
Setbacks: 30 feet from The picnic area is located within
residential lots and 25 feet 30 feet of the property line;
from right-of-way for street however, it is not considered a
Paj 8
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 8
structure and is permitted to be
located within 30 feet of the
property line.
Landscaping The Landscape Plan provides one
tree in this area. It is located on the
south side of the dumpster
enclosure.
Ms. Cornwell noted that the applicant applied to the Board of Adjustment for a variance
reducing the required amount of active recreation area on the site from 3,600 S.F. to 1,593 S.F.
She advised members that during their meeting of November 3, 2010, the Board of Adjustment
granted this variance and approved the proposed amenities.
Staff submitted the following comments and recommendations regarding the Active Recreation
Area to be constructed:
1. The proposed plan does not meet the area requirements for the Active Recreation
Area. The plan is required to provide 3,600 S.F. of Active Recreation Area and it is
proposing 1,593 S.F. of Active Recreation Area.
2. Staff recommends approval of the multipurpose community room and the picnic area
with two (2) picnic tables and a grill.
3. Ensure that one (1) of the picnic tables is handicapped accessible.
4. Revise the following on the Active Recreation Area Plan Sheet: Revise the
calculation for the Active Recreation Area required. It should state 75 S.F. per
dwelling unit with a minimum of 2,500 S.F. provided on site.
5. In the event that major changes and revisions to the Site Plan occur in the finalization
of the Site Plan, contact the Planning Office. Examples include reorientation of
building, relocation of site components like stormwater management areas, and
increases in floor area. These changes may require resubmittal for review by the
Development Advisory Committee, Planning Commission, or other agencies and
commissions making recommendations in regards to the plan.
6. The applicant was reminded of the requirements for construction phasing of the
recreation area as associated with the development of the residential units.
Article 5, §10.6 Construction phasing. The recreation and open space
areas shall be completed in a proportion equal to or greater than the
proportion of residential dwelling units completed, except that 100
percent of the recreation and open space areas shall be completed prior to
issuing building permits for the final 20 percent of the dwelling units
proposed. Building permits shall not be issued for dwelling units unless
the requirements of this section are met.
Paj 9
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 9
7. There shall be provisions which ensure that the common open space land and
community room (including Active Recreation Area) shall continue as such and be
properly managed and maintained. The developer shall either retain ownership and
responsibility for maintenance of such open land; or provide for and establish one (1)
or more organizations for the maintenance of all common open space.
a. Add a note on the Site Plan regarding who is responsible for maintenance and
insurance on the common open space.
In response to Mr. Ruane, Mrs. Ann Marie Townshend, Director of Planning and Community
Development, indicated that the applicant submitted an application to the Board of Adjustment.
She explained that if a development project requires a variance to proceed, the requested
variance must go before the Board of Adjustment prior to consideration by the Planning
Commission, since the Planning Commission is not authorized to approve a request that does not
meet City Code. She noted that staff determined that the Code should be revised in this area and
she plans to prepare such a revision. Mrs. Townshend provided a legal opinion submitted by
City Solicitor Rodriguez (attachment to Committee minutes), which indicated that the applicant
proved that there were exceptional practical difficulties and has met the legal criteria for a
variance.
Mr. Ruane clarified that his concerns related to procedures within the Planning Department.
Responding, Mrs. Townshend advised members that staff does not refer matters to the
Board of Adjustment, explaining that applicants submit applications to the Board. All
applications received by the Planning Department are presented to the Board of Adjustment. She
also explained that, procedurally, variances must be considered by the Board of Adjustment prior
to review by any other body (Planning Commission, Development Advisory Committee, etc.).
Responding to Mrs. Russell, Mrs. Townshend confirmed that members must now consider the
proposed Active Recreation Plan within the square footage that has been granted by the
Board of Adjustment.
Mr. Zachery Carter, Director of Parks and Recreation, advised members that, as an alternative,
he had suggested that the Board of Adjustment members consider the option of cash in lieu of
parkland rather than requiring the specified land area. Since the formula for the cash in lieu
would have resulted in an excessive amount and prevented the project from moving forward, he
had proposed that consideration be given to taking the value of the land to determine the cash in
lieu amount (similar to the action taken for Dove View), which would have equated to
approximately $15,000. However, Mr. Carter stated that the City Solicitor indicated that the
Board of Adjustment did not have such authority, explaining that the Board of Adjustment could
only grant or deny the variance.
Mrs. Townshend further explained that the Parks, Recreation, and Community Enhancement
Paj 10
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 10
Committee cannot go against the action of the Board of Adjustment. She advised members that
the legal role of the Board of Adjustment is to adjust the Code by changing Code requirements as
they relate to a project and that no other body can impose a requirement that has been waived by
the Board.
Responding to Mr. Lewis, Mrs. Townshend stated that, in accordance with the Dover Code, the
required minimum on-site Active Recreation Area is 2,500 S.F. The calculation for Bayard
Plaza would be 3,600 S.F.; however, the code requirement was superceded by the action of the
Board of Adjustment approving a variance requiring only 1,593 S.F. of on-site Active Recreation
Area.
Dr. McGlumphy indicated his desire to support projects that will provide improvements to the
downtown area and felt that the City should not be a blockade to such projects.
Mr. Matt Spong, Landscape Architectural Services, and Mr. Doug Liberman, Larson
Engineering, reviewed the details regarding the proposed Active Recreation Plan for the Bayard
Plaza.
Mr. Ruane noted that the size proposed for the multipurpose community room is 751 S.F. and
that there are 48 units proposed. He questioned if there is a standard for determining the resident
ratio to space to assist in determining if the room is adequate for the number of residents.
Responding, Mrs. Townshend stated that there is no standard in this regard. Mr. Lieberman
advised members that the 751 S.F. is the area prescribed by the Delaware State Housing
Authority based on the number of units.
Mr. Ruane relayed his support for the project and explained that his concerns are related to
procedural issues. Noting that staff intends to prepare zoning text amendments, he suggested
that staff provide standards for the size of a community room that would serve as a multipurpose
room.
In response to Mr. Ruane, Mrs. Townshend assured members that staff will work on proposed
amendments as soon as possible to address the concerns relayed.
The Committee recommended acceptance of the Active Recreation Plan for Bayard Plaza as
presented, with the inclusion of staff=s comments and recommendations.
Mrs. Russell reiterated the concerns of the Committee regarding the matter being presented to
the Committee after the review by the Board of Adjustment. She assured members that staff has
been requested to review this matter for possible ordinance amendments that would prevent
future occurrences.
At the request of Mrs. Williams, Mrs. Townshend explained that the applicant for the Bayard
Plaza made application to the Board of Adjustment for a variance from the Active Recreation
Paj 11
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 11
requirements. She stated that Bayard Plaza was able to provide 1,500 S.F. of Active Recreation
Area on the site and requested a variance for the remaining area required as well as exemption
from a cash-in-lieu payment. If the variance was not requested, Mrs. Townshend stated that the
project would have required 3,600 S.F. of Active Recreation Area. She noted that a cash-in-lieu
payment for the portion that could not be provided could also have been requested.
Concurring with Mrs. Russell, Mrs. Williams relayed her concerns with the process.
Responding, City Solicitor Rodriguez assured members that it was appropriate for the Board of
Adjustment to consider the application and to grant the variance. With regards to the
cash-in-lieu, he stated that the amount required would have been so great that the developer
would have been unable to move forward with the project, which he felt influenced the Board=s
decision to grant the variance. To the best of his recollection, this was the first time such a
request had been considered by the Board of Adjustment.
Reiterating the concerns relayed during the Committee meeting, Mr. Ruane felt that the matter
created a precedent that provides an opportunity for others in a similar situation to go before the
Board of Adjustment. He noted that members have requested that staff take the appropriate
action to resolve these types of issues from recurring. Although Committee members recognized
the level of financial commitment to the project; there was concern that no cash-in-lieu payment
was required when other projects with less ability to commit funds have made some financial
contribution. As a result of all the concerns relayed, Mr. Ruane noted that the Committee has an
expectation that this type of situation will not occur in the future.
Responding to Mr. Salters, City Solicitor Rodriguez explained that the Board of Adjustment has
the authority to grant variances and Council does not have the authority to reverse action taken
by the Board of Adjustment. Should Council vote against the action of the Board of Adjustment
and the recommendation of the Committee, City Solicitor Rodriguez indicated that the variance
granted by the Board of Adjustment would not be affected.
In response to Council President Hogan, Mrs. Townshend stated that, in retrospect, it might have
been prudent for the Board of Adjustment to exclude review by the Parks, Recreation, and
Community Enhancement Committee on this matter. She stated that this is an unusual
circumstance and is not a typical variance considered by the Board of Adjustment.
Mrs. Williams questioned if there was an appellate action that could be taken against the
decision of the Board of Adjustment. Responding, City Solicitor Rodriguez indicated that only
those who are involved in the variance could make such an appeal, for instance, an applicant
could appeal to the Superior Court if a request for variance was denied. He advised members
that there is no appellate process provided for the City of Dover in this regard. City Solicitor
Rodriguez noted that this particular application is very unusual and felt assured that the matter
would not set a precedent.
Mr. Ruane stressed that the concerns relayed by members did not reflect disapproval of the
proposed project. He stated that the Committee supports the project and believes it would be
beneficial to the City and the downtown Dover area.
Mrs. Williams requested the City Solicitor to determine if there is a viable means to change the
Paj 12
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 12
process due to concerns that a precedent has been set and the problem was not solved.
Concurring, Mr. Bonar felt that this issue sets a precedent and will place Council in an awkward
position when making decisions of this nature in the future. He also felt that Council, as a
legislative body, should have absolute authority with regard to approval of all matters submitted
to Council for consideration by any public body. He suggested that the City Solicitor complete
the request of Mrs. Williams and bring forward a recommendation to resolve such issues in the
future.
Mrs. Russell moved for approval of the Committee=s recommendation for acceptance of the
Active Recreation Plan for Bayard Plaza as presented, with the inclusion of staff=s
comments and recommendations, seconded by Dr. McGlumphy and unanimously carried.
Proposed Ordinance No. 2010-28 - Amendments to Appendix B - Zoning, Article 3 -
District Regulations, Section 14 - Limited Central Commercial Zone (C-2A) and Section 30
- Recreational and Open Space Zone (ROS)
Mrs. Ann Marie Townshend, Director of Planning and Community Development, reminded
members that staff regularly reviews the Zoning Ordinance for areas that need to be revised or
rewritten. She stated that two (2) areas within the District Regulations are recommended for
amendment, as follows:
1) Amend C-2A (Limited Central Commercial Zone) to allow parking lots and
structures as principal uses on suitably landscaped lots, through the Conditional Use
process. This change would add the Conditional Use which is already listed in the C-
2 (Central Commercial Zone). By making this a Conditional Use, the Planning
Commission would be given discretion to ensure that parking lots and structures are
constructed in a way that complements the surrounding area.
2. Amend ROS (Recreational and Open Space Zone) to add cemeteries as a permitted
use and to exempt interment (burial) structures, such as mausoleums, from the 30-foot
setback from property lines. When staff drafted the text for the ROS zone, cemeteries
were not specifically addressed; however, in mapping the zone, cemeteries were
rezoned to ROS. Following discussion with the administration at Holy Cross
Cemetery, staff determined that the absence of cemeteries as a permitted use in the
ROS zone was an oversight and should be corrected.
Staff recommended that the proposed ordinance be forwarded to City Council for First Reading
on November 22, 2010, referred to the Planning Commission for consideration on December 20,
2010, and that a Final Reading and public hearing be set before City Council on January 10,
2011.
In response to several members= concerns regarding the close proximity of mausoleums to
residential private property, Mrs. Townshend suggested that if the Committee desired that the
setback apply only when adjacent to residential areas, the proposed ordinance could be amended
by adding the following to Line 23: "unless they are adjacent to residential properties." She
noted that the addition of this language would not have prohibited the mausoleum currently
located at Holy Cross since the cemetery is not adjacent to residential properties. Mrs.
Townshend explained that adjacent properties include only those that actually abut and that
Paj 13
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 13
properties across the street would not be considered "adjacent."
Responding to Dr. McGlumphy, Mrs. Townshend anticipated that those residential
neighborhoods located on South State Street to Route 13 would remain as such, which was very
clear in the 2008 Comprehensive Plan. She assured members that the proposed amendment
would not impact this region as it is not zoned C-2 or C-2A; therefore, a stand-alone parking lot
would not be permitted. Mrs. Townshend advised members that non-residential parking cannot
be provided on a residential property. She explained that the situation involving Dr. David
Jawahar=s office, which is located across the street from the hospital, is due to the property being
zoned RGO (General Residential and Office), which allows both residential and office use;
therefore, the requested parking was permitted. However, Mrs. Townshend assured members
that the parking cannot be expanded. In addition, she reminded members that the RGO is a
closed zone and that the Dover Code does not allow more parking than 125% of the minimum.
Referring to the proposed amendment to Line 23 suggested by staff, Mr. Ruane questioned
the possibility of including a number of feet (distance), rather than the use of "adjacent," to
address those concerns regarding the possibility of an intrusion into a neighborhood.
Responding, Mrs. Townshend suggested that the proposed ordinance could be amended by
adding the following to Line 23: "unless adjacent to residential uses. For the purposes of this
section, adjacent shall include properties separated by a street."
Mrs. Horsey questioned if the addition of greater footage would provide better protection.
Responding, Mrs. Townshend suggested that the setback could be set at 50 feet, rather than
30 feet (as noted in Line 22 of the proposed ordinance). To include a right-of-way (across the
street), she suggested that the setback be set at 60 feet. Should members wish to prohibit
structures from the perimeter of a cemetery, she suggested the elimination of the following
additional proposed text in blue font (Lines 22 and 23): "In cemeteries, structures associated
with interment shall be exempt from this requirement."
The committee recommended adoption of Proposed Ordinance #2010-28, as amended to include
Lines #1-14 only, amending Article 3 - District Regulations, Section 14 - Limited Central
Commercial Zone (C-2A), Subsection 14.4 - Conditional Uses, of Appendix B of the Zoning
Code and that the proposed ordinance (attachment to Committee minutes) be forwarded to City
Council for First Reading on November 22, 2010; referred to the Planning Commission for
consideration on December 20, 2010; and that a Final Reading and public hearing be set before
City Council on January 10, 2011.
By consent agenda, Mrs. Williams moved for approval of the Committee=s
recommendation, seconded by Mr. Bonar and carried by a unanimous roll call vote. (The
First Reading of the ordinance will take place during the latter part of the meeting).
Proposed Amendment to the 2010 Community Development Block Grant (CDBG) Action
Plan - Unanticipated Program Income
Mrs. Tracey Harvey, Community Development Director, advised members that the
Community Development Office has received an additional $25,087 in program income that is
Paj 14
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 14
uncommitted. Staff requested that these additional funds be allocated to the three (3) 2010 sub-
recipient grant projects. The breakdown of the uncommitted funds is as follows:
Uncommitted program income from 2010 grant allocation $12,234
Housing Rehabilitation loan payoff $ 6,953
1994 Integrated Disbursement and Information System (IDIS)
uncommitted funds $ 5,900
TOTAL $25,087
Since the grant requests from the 2010 sub-recipients were funded below the requested levels,
Mrs. Harvey explained that the additional funding may be added to the existing projects to fund
them at the requested level. She noted that funding all three (3) sub-recipients at the initial
requested level would total $19,000, leaving a balance of $6,087, which staff recommended be
added to the Housing Rehabilitation Program.
Staff recommended awarding the $25,087 in additional CDBG program income to sub-recipient
projects.
Responding to Mr. Ruane, Mrs. Harvey confirmed that the recommended action would increase
funding for the projects, as follows:
Project 4 - Habitat for Humanity from $32,000 to $40,000
Project 5 - Connections Community Support Program from $12,000 to $15,000
Project 6 - RC&D from $32,000 to $40,000
In response to concerns of Mr. Ruane, Mrs. Harvey confirmed that the program administration
costs would increase. She noted that program administration is funded at $58,000 and would
increase to $65,000, which equates to 1.5% of the grant applications.
Mr. Lewis felt that members should consider issuing the additional funds to other applicants that
did not receive grant funding, noting that those recommended for receipt of the additional funds
have already received some funding. Responding, Mrs. Russell questioned how members would
determine which of those applicants qualified. Mrs. Harvey reminded members that the
applications were scored and that, to her recollection, the remaining applicants did not score
well.
Mr. Ruane suggested the possibility of providing some of the additional funds to the
Police Department. Responding, Mrs. Townshend stated that the Dover Police Department did
not apply; therefore, they could not even be considered. In addition, she stated that public
service funds are capped at 15% for all CDBG projects.
Mr. Ruane questioned if any of the additional funds could be assigned to Project 7 - Community
Revitalization Infrastructure, which involved the reconstruction of streets and curbs.
Paj 15
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 15
Responding, Mrs. Townshend stated that, although the total amount requested was not provided
to the Community Revitalization Infrastructure Project, the work associated with this grant has
been completed or is almost complete; therefore, additional funds would not provide for
additional work being completed.
The Committee recommended awarding the $25,087 in CDBG program income to sub-recipient
projects, as recommended by staff.
By consent agenda, Mrs. Williams moved for approval of the Committee=s
recommendation, seconded by Mr. Bonar and carried by a unanimous roll call vote.
UPDATES
The following updates were provided to members:
Puncheon Run Watershed Action Team Update
There was no update provided for the Puncheon Run Watershed Action Team.
Planning and Funding for New Library
Mr. Zachery Carter, Director of Parks and Recreation, reviewed the update for the Planning and
Funding for the New Library provided to members.
In response to Mrs. Russell, Mr. Carter stated that the proposed opening date for the new library
is September 2012, explaining that construction will take 18 months.
Responding to Dr. McGlumphy, Mr. Carter assured members that he would provide them with
an update on committed funds for the library project.
The Committee recommended acceptance of the Update for the Planning and Funding for the
New Library.
By consent agenda, Mrs. Williams moved for approval of the Committee=s
recommendation, seconded by Mr. Bonar and carried by a unanimous roll call vote.
CDBG Program
Mrs. Tracey Harvey, Director of Community Development, reviewed the Status of
FY 2009-2010 CDBG Projects Report, which was provided to members.
The Committee recommended acceptance of the Update for the CDBG Program.
By consent agenda, Mrs. Williams moved for approval of the Committee=s
recommendation, seconded by Mr. Bonar and carried by a unanimous roll call vote.
Housing and Recovery Act of 2008 Funds (Neighborhood Stabilization Fund)
Paj 16
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 16
Mrs. Tracey Harvey, Director of Community Development, reviewed the Update for the Housing
and Recovery Act of 2008 Funds (Neighborhood Stabilization Fund) which was provided to
members.
In response to Dr. McGlumphy, Mrs. Townshend stated that the City does not take ownership of
any properties, explaining that properties are owned by the Diamond State Community Land
Trust or the Dover Housing Authority. She stated that the City does not have the staff or
expertise to buy and sell properties.
The Committee recommended acceptance of the Update for the Housing and Recovery Act of
2008 Fund (Neighborhood Stabilization Fund).
By consent agenda, Mrs. Williams moved for approval of the Committee=s
recommendation, seconded by Mr. Bonar and carried by a unanimous roll call vote.
Youth Advisory Committee
Mrs. Russell advised members that local schools will be contacted to solicit applications from
students who may be interested in serving on the Youth Advisory Committee.
The committee recommended acceptance of the Update for the Youth Advisory Committee.
By consent agenda, Mrs. Williams moved for approval of the Committee=s
recommendation, seconded by Mr. Bonar and carried by a unanimous roll call vote.
Mrs. Williams moved for acceptance of the Parks, Recreation, and Community
Enhancement Committee Report, seconded by Mr. Bonar and unanimously carried.
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE REPORT -
NOVEMBER 8, 2010
The Legislative, Finance, and Administration Committee met on November 8, 2010 with
Chairman Leary presiding.
Review and Recommendation - Filling of Critical Positions
During their meeting of February 23, 2009, members recommended approval of the Hiring
Freeze for Fiscal Year 2008-2009, but to allow the hiring of critical positions through the review
and approval of the Legislative, Finance, and Administration Committee and City Council. It
was suggested that there be a "standing" agenda item to consider the filling of critical positions
and, if there are no positions to consider, the item could be removed.
Permission to Recruit - Motor Equipment Operator (MEO) II (Streets Division) - In-House,
MEO I
Mr. Anthony DePrima, City Manager, reviewed a request to recruit a Motor Equipment
Operator (MEO) II and an MEO I in the Streets Division. He stated that a vacancy was created
when a current MEO II employee was transferred to the Public Utilities Department. Mr.
DePrima advised members that MEO II and III positions have traditionally been career ladder
positions whereby vacancies are filled in-house. This provides an opportunity for first-level
Paj 17
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 17
MEO employees to advance within the department. As such, staff has requested to advertise the
MEO II position in-house and, assuming that an existing MEO I employee is hired for this
position, to fill the MEO I position.
Mr. DePrima reminded members that an MEO I position was recently advertised; therefore, in
order to speed the hiring process, staff suggested making a selection from the applications
already received.
The Committee recommended approval of the request to recruit for a Motor Equipment Operator
(MEO) II in the Streets Division (in-house posting) and Motor Equipment Operator (MEO) I in
the Streets Division, as recommended by staff.
By consent agenda, Mrs. Williams moved for approval of the Committee=s
recommendation, seconded by Mr. Bonar and carried by a unanimous roll call vote.
Proposed Ordinance #2010-29 - Appendix B - Zoning, Article 3 - District Regulations,
Section 8 - Mobile Home Park Zone (MHP)
Mrs. Ann Marie Townshend, Director of Planning and Community Development, presented
members with Proposed Ordinance #2010-29. She explained that the ordinance applies to areas
within the MHP (Mobile Home Park) Zone where parks are developed with private streets and
would require that such streets remain clear and unobstructed, including clear access to
driveways and mailboxes. She explained that the proposed amendment would ensure that
residents have access to their driveways and mailboxes during snow storms and other events.
Staff recommended that Proposed Ordinance #2010-29 be forwarded to City Council for a
First Reading on November 22, 2010, referred to the Planning Commission on December 20,
2010, and that a Final Reading and public hearing be held before City Council on January 10,
2011.
The Committee recommended that Proposed Ordinance #2010-29 (attachment to Committee
minutes) be forwarded to City Council for a First Reading on November 22, 2010, referred to the
Planning Commission on December 20, 2010, and that a Final Reading and public hearing be
held before City Council on January 10, 2011.
By consent agenda, Mrs. Williams moved for approval of the Committee=s
recommendation, seconded by Mr. Bonar and carried by a unanimous roll call vote. (The
First Reading of the ordinance will take place during the latter part of the meeting.)
Proposed Ordinance #2010-30 - Budget Amendments
Mrs. Donna Mitchell, Controller/Treasurer, reviewed Proposed Ordinance #2010-30 - Budget
Amendments, which was provided to members. She explained that the amendments incorporate
the audited budget balances of all funds and accounts.
Paj 18
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 18
During the City Council meeting of October 25, 2010, Mrs. Mitchell reviewed the
Quarterly Revenue Report and indicated that the City=s transfer tax revenue forecast was
decreased due to a decline in the overall market and a decrease in real estate sales. Mr. Ruane
noted that the City=s Charter requires a balanced budget and that the projection indicates a
revenue shortfall. At that time, Mrs. Mitchell stated that bringing forward a budget amendment
with the additional carry forward balance would cover the shortfall from the audited budget
balances.
Mrs. Mitchell noted that the motion made by Council on October 25, 2010 was "to accept the
Quarterly Revenue Report as of September 30, 2010, with the understanding that staff will
provide a budget amendment to account for the reduction of expenditures in the amount of
$350,000 related to the diminishing transfer tax estimate." She explained that the motion
indicated an expectation for a reduction in expenditures without using any excess carry forward
balance. Mrs. Mitchell advised members that the proposed ordinance amendment uses the
excess carry forward balance rather than a reduction in expenditures.
In addition, Mrs. Mitchell stated that the Electric Fund projects have also been included in the
proposed amendments. She reminded members that, during their meeting of October 25, 2010,
the Utility Committee recommended approval of the revised Capital Investment Project (CIP) for
the Electric Revenue Fund and, since this recommendation would be considered by Council
(during their meeting of November 8, 2010) prior to the proposed budget amendments being
presented to Council for approval, staff included the CIP amendments as well.
Staff recommended approval of the draft budget ordinance to incorporate audited budget
balances and revised CIP=s to be forwarded to City Council for a First Reading on November 22,
2010.
Referring to Pages 16 and 17 of the Council Meeting Minutes of October 25, 2010 as alluded to
by Mrs. Mitchell, Mr. Ruane noted that the motion directed staff to provide a budget amendment
to account for the reduction of expenditures in the amount of $350,000 related to the diminishing
transfer tax estimate. He stated that the proposed ordinance does not carry out the intent of the
motion and suggested that the ordinance be amended or deferred until such time that staff has the
opportunity to prepare a budget amendment as directed by Council.
In response to Mr. McGiffin, Mrs. Mitchell confirmed that the typical practice has been for all
expenditures to be addressed during the mid-year review. Should members wish to address the
reduction of expenditures at mid-year review, Mrs. Mitchell suggested that they also consider the
reduction of revenue at this time and allow the excess to go into the ending budget balance,
rather than offsetting the reduction of revenue.
Responding to Mr. Ruane, Mr. DePrima confirmed that generally the mid-year report to Council
is made in March rather than January of each year. Mr. Ruane relayed his concern with a delay
in addressing the reduction of expenditure based on the continuing loss of revenue.
Mr. DePrima assured members that although Mr. Ruane=s concerns were valid, staff is attentive
to their responsibilities and that action would be taken to address any budgetary issues, even if
Council does not take immediate action in this regard.
Paj 19
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 19
Mr. Ruane referred to Line 197 of the proposed ordinance and noted that there was an
adjustment to the prior year=s balance for the Electric Revenue Fund proposed in the amount of
$1,451,589. He stated that, during the last review of the Electric Fund, he proposed an
additional power cost adjustment for rate payers at the beginning of the year, since revenue was
greater than anticipated. Mr. Ruane noted that the $1,451,589 would be available for a power
cost adjustment by January 1, 2011 and suggested that the City Manager be requested to provide
information to members on how this would affect rate payers and whether a rate adjustment
could be provided.
Noting that the suggested budget ordinance amendments were proposed for consideration at the
next Committee meeting, Mr. DePrima stated that, although staff could develop information
regarding the concept of a power cost adjustment, additional time may be needed to complete
research. Although he was not opposed to an early power cost adjustment, he stated that
adjustments are typically accomplished in June. Mr. DePrima reminded members that the last
power cost adjustment issued by Council was for an increase. He cautioned members that action
taken by Council in January will impact the action required in June.
The Committee recommended that Proposed Ordinance #2010-30 - Budget Amendments be
deferred until the next Committee meeting, with the understanding that the City Manager will
present a plan to address the expenditures that would be required to meet the reduced revenue
with the proposed ordinance amendment.
Responding to the request of Dr. McGlumphy, Mr. Leary stated that, although this matter
was considered by the Committee during a meeting held earlier in the evening, since he was
not aware that there would be questions in this regard, he was not prepared to present the
Committee=s recommendation; however, he assured members that the recommendation of the
Committee would be presented during the Council Meeting of December 13, 2010. Clarifying,
Council President Hogan stated that the Committee=s recommendation was for the approval of
Proposed Ordinance #2010-30 - Budget Amendments as presented, and that any changes that
may be necessary would be considered during the mid-year review.
In response to Mrs. Williams, Mr. DePrima explained that the original amount budgeted for
transfer tax was $1M and that, based on the quarterly projection, staff submitted a proposal to
reduce the amount to $650,000. On November 18, 2010, the City received a letter from the State
of Delaware indicating that the City would received a very large transfer tax in the amount of
approximately $647,000 due to the sale of several large apartment buildings. Utilizing the
$650,000 projection and adding in the $647,000, Mr. DePrima stated that the actual transfer tax
would be approximately $1.3M, which is $300,000 over the original budgeted amount of $1M.
Mr. Leary reiterated that there is no recommendation for this item at this time. (The Committee=s
recommendation will be presented to members for consideration during their Regular Meeting of
December 13, 2010).
Paj 20
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 20
Review of City of Dover Identity Theft Prevention Policy
Mrs. Teresa Tieman, Senior City Administrator, advised members that the City of Dover
Privacy Committee met on October 15, 2010, at which time members discussed an incident that
occurred on March 25, 2010 in the Information Technology (IT) Department. She noted that the
incident involved a document with confidential information being placed on the City=s website
for approximately 10 minutes. The document was used by a programmer in the department to
test the website. Since this incident, the IT Department has adopted a policy to use only
documents that have been created for the sole purpose of testing when testing the website. The
Privacy Committee felt that the remedy developed by the IT Department was acceptable and that
no changes were required to the Identity Theft Prevention Policy.
The Committee recommended acceptance of the Report provided by the Privacy Committee.
By consent agenda, Mrs. Williams moved for approval of the Committee=s
recommendation, seconded by Mr. Bonar and carried by a unanimous roll call vote.
Approval of Library Funding Plan Transfers and Use of Green Energy Rate Revenue
Mr. Anthony DePrima, City Manager, reminded members that, during the Committee meeting of
October 11, 2010, a detailed status report of the new Dover Library Project was presented.
The presentation included the most up-to-date funding plan. As reported at that meeting,
Mr. DePrima stated that several of the funding sources found in the "Highly Probable" column
could be moved into the "Committed" column by action of City Council, as follows:
1) Reynolds Trust Funds: $46,355. An estate bequest received several years ago for
the library.
2) Reciprocal Borrowing Residual Funds: $30,000. These funds represent the
difference between the committed column and the highly probable column in the
"City Reserve Contribution" row.
3) Green Energy Rate Funds: $215,000. The City has set aside $60,000 and, since
October 2009, has been setting aside half of the revenue, or about $5,400 per
month. By January 2012, $215,000 will be accumulated.
4) Use of Green Energy Funds for Debt Service for Green Energy Loan. After
January 2012, current plans project using $8,000 of the monthly revenue to
finance a $1.5 million loan at 2.5% with a 20-year term. The loan amount and
terms are subject to change and will not be sought until late 2011. At this time,
staff is simply seeking approval to use these funds for this purpose.
Staff recommended approval to commit the following funds to the New Library Project:
1) Reynolds Trust Funds in the amount of $46,355, 2) Reciprocal Borrowing Residual Funds in
the amount of $30,000, 3) Green Energy Rate Grant funds in the amount of $215,000, and 4)
Paj 21
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 21
Use of Green Energy Funds: Debt Service for Green Energy Loan.
The Committee recommended approval of staff=s recommendation.
In response to Dr. McGlumphy regarding Recommendation #4 - Debt Service for Green Energy
Loan, Mr. DePrima explained that the amount of the loan is projected to be $1.5M; however, the
actual amount of the loan would not be known until the City is closer to the project, assuming it
is approved and prices are obtained. The recommendation is to approve the use of these funds
for this purpose.
Mr. Leary moved to commit the following funds to the New Library Project: 1) Reynold
Trust Funds in the amount of $46,355, 2) Reciprocal Borrowing Residual Funds in the
amount of $30,000, 3) Green Energy Rate Grant funds in the amount of $215,000, and 4)
Use of Green Energy Funds: Debt Service for Green Energy Loan, as recommended. The
motion was seconded by Mr. Salters and unanimously carried.
Mr. Leary moved for acceptance of the Legislative, Finance, and Administration
Committee Report, seconded by Mr. McGiffin and unanimously carried.
MONTHLY CIP REPORT - SEPTEMBER 2010
By motion of Mrs. Williams, seconded by Mr. Bonar, the Monthly CIP Report for
September 2010 was accepted by consent agenda.
2010 ANNUAL REPORT FOR THE DOWNTOWN DOVER PARTNERSHIP
Mr. Bill Neaton, Economic Development Director, reviewed the 2010 Annual Report for the
Downtown Dover Partnership (DDP), which was provided to members.
Responding to Mr. Ruane, Mr. Neaton stated that, although half of his time is to be devoted to
the Downtown Dover Partnership as the Executive Director and half as the Economic
Development Director for the City, over the last several months his role as Economic
Development Director for the City has been emphasized due to inquiries regarding properties
and the desire to bring businesses into the City. He advised members that during the last two (2)
years, time dedicated to the Downtown Dover Partnership has been reduced due to the assistance
of the Downtown Coordinator.
In response to Dr. McGlumphy, Mr. Neaton indicated that the greatest impediment the City is
facing in economic development is the condition of vacant properties. Although these properties
are not in such a condition that would require condemnation, they are not in a condition to be
suitable for immediate use. He noted that a landlord made improvements to the building located
at the corner of Loockerman Street and Governors Avenue during the last year, and the building
became occupied. He assured members that City staff has utilized the vacant property ordinance
and that contact is made with landlords to encourage improvements.
Paj 22
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 22
Mr. Ruane questioned if there has been success working with the owner of the vacant lot known
as the Collegian. Mr. Neaton stated that a possible solution was identified during the charrette
process and he has been working with a developer, who is working with a retailer in regard to
this property. He advised members that the cost of the property has been substantially reduced,
noting that it was initially $4M.
Mr. Leary moved for acceptance of the 2010 Annual Report for the Downtown Dover
Partnership, seconded by Mr. Salters and unanimously carried.
EVALUATION OF BIDS - BIDDING AND CONSTRUCTION ADMINISTRATION -
LIBRARY
Mr. Anthony DePrima, City Manager, advised members that the architectural firm of
Holzman, Moss, & Bottino Architecture (HMBA) completed the Dover Public Anchor Library
construction documents in November 2010. He noted that with the completion of the
construction documents, the City is ready to begin the next steps for the library project. Mr.
DePrima reminded members that these steps were outlined in the Dover Anchor Library
presentation provided to members during the Parks, Recreation, and Community Enhancement
Committee and Legislative, Finance, and Administration Committee meetings of October 11,
2010 and include the Bidding and Bidding Administration concurrently, and the Construction
and Construction Administration concurrently. Mr. DePrima explained that the Council Action
Form provided to members addresses the Bidding and Construction Administration Services
provided by the project architect: Holzman, Moss, & Bottino Architecture. He indicated that one
(1) contract is proposed for both services; however, the contract will allow the City to terminate
the contract for any reason after the Bidding Services Phase. Mr. DePrima explained that
Council action would be required to proceed with construction, which is planned in
January/February after bidding has been completed, evaluated, and presented to members. He
assured members that the contracts have been written in such a way that if the City does not
move forward with construction, the City has no obligation to either party under the construction
portion of the contract.
Bidding:
Mr. DePrima advised members that the scope of work will include working with the construction
manager to prepare the final documents in the required format for the public bidding process.
During the bidding process, the work will include attending a pre-bid meeting with sub-
contractors, responding to sub-contractor questions, and issuing addenda as required to respond
to questions about the documents. He noted that following the receipt of bids by the construction
manager, the work will include reviewing the bidders and discussing financial alternatives to
allow the project to proceed to the construction phase of work. The total cost for Bidding
Administration and estimated 10 percent project reimbursable is $119,409.
Construction Administration:
Mr. DePrima advised members that this phase of work, if authorized, will include periodic
reviews of the site and building construction, responding to construction manager questions
Paj 23
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 23
(Requests for Information), issuing clarification sketches, and reviewing all submittals and shop
drawings. Participation in monthly executive committee meetings and bi-monthly site visits
would also be involved. Upon substantial completion of the project, the work will include
preparation of a punch-list, with the assistance of the construction manager, and review of items
until they have been completed. Record drawings will not be provided as part of this scope and
will be provided by the construction manager. This phase will also include review and
documentation for the U.S. Green Building Council (USBGC) - Leadership in Energy and
Environmental Design (LEED) submittal process and coordination with all consultants and the
construction manager to assure that all requirements have been established and delivered. The
total cost for Construction Administration and estimated 10 percent reimbursable is $477,638.
Staff recommended that the City Manager be authorized to sign a Professional Services Contract
for the Bidding and Construction Administration for the Dover Public Anchor Library to
Holzman, Moss, & Bottino Architecture firm for the amount of $597,047. This amount covers
the total expenses and estimated 10 percent project reimbursable expenses. Total cost for bidding
and estimated 10 percent project phase reimbursable is $119,409.
Mr. Ruane moved for approval of staff=s recommendation, seconded by Mr. McGiffin.
Responding to Dr. McGlumphy regarding the amount of $597,047, Mr. Steve Benesh of
Holzman, Moss, & Bottino stated that there is a full team involved and that, in addition to the
architectural fees, the amount includes architect, engineer, and consultant fees. He also noted
that a local architect is performing architectural, civil engineering, and landscape architect
services. Additional team members include a mechanical, electrical, and fire protection engineer
as well as specialty consultants, such as audio/visual, telecommunications security, and acoustic
experts who will be involved in the construction of the project. He stated that he believed that
the schedule plans for 20 months of work.
Responding to Mr. Bonar, Mr. Benesh stated that the Delaware firms involved include the
Becker Morgan Group (architect and civil engineer) and Landscape Architectural Services
(landscape architect).
In response to Mr. Salters, Mr. DePrima stated that the bid process is open and competitive and
there is no guarantee as to the contractors. Mr. Jerry Dougherty, Vice President of EDiS,
explained that the process is similar to Title 29 of the State of Delaware Code, emphasizing that
the project will be advertised, and each contract will be primed to EDiS Company and will be
awarded through open, competitive bids. He stated that there is no preference for minority bids.
Clarifying, Mr. DePrima advised members that EDiS Company has the City=s Purchasing Policy
which they will follow. He reminded members that the City=s Policy includes local vendor and
minority vendor preferences, and felt confident that EDiS will follow those portions of the City=s
Purchasing Policy. Responding, Mr. Dougherty confirmed the use of the City=s Purchasing
Policy.
The motion authorizing the City Manager to sign a Professional Services Contract for the
Bidding and Construction Administration for the Dover Public Anchor Library to
Holzman, Moss, & Bottino Architecture firm in the amount of $597,047, with the
Paj 24
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 24
understanding that this amount covers the total expenses and estimated 10 percent project
reimbursable expenses, and total cost for bidding and estimated 10 percent project phase
reimbursables of $119,409, was carried by a unanimous roll call vote.
EVALUATION OF BIDS - CONSTRUCTION MANAGER AT RISK CONTRACT
Mr. Anthony DePrima, City Manager, reminded members that EDiS Company was selected as
the Construction Management firm for the Dover Public Anchor Library project in July 2009.
With the completion of the construction documents, the City is ready to begin the next steps for
the library project. These steps, as outlined in a recent presentation to City Council through the
Parks, Recreation and Community Enhancement Committee and the Legislative, Finance, and
Administration Committee, are the Bidding and Bidding Administration concurrently, and the
Construction and Construction Administration concurrently.
Mr. DePrima stated that the Council Action Form provided to members addresses the
Bidding, Construction and Construction Administration Services for the project with the
City=s Construction Manager, EDiS. One (1) contract is proposed for both services; however,
the contract will allow the City to terminate the contract for any reason after the Bidding
Services Phase. He advised members that Council action to proceed to construction is planned
in January after bidding has been completed, evaluated and presented to Council. EDIS
Company will prepare the library bid documents and solicit bids for the construction of the
library. Once bids are submitted, he stated that EDiS will evaluate all bids and present their
recommendations to Council for the construction of the library. The cost for the bidding of the
project is $17,100.
Mr. DePrima advised members that the proposed contract is called a "Construction Manager at
Risk" contract, with EDiS Company as the Construction Manager at Risk. This contract
provides that there will be a guaranteed maximum price for library construction that will be
determined once the bids are received. The estimated cost of construction is $16,821,162. (This
includes pricing from the Total Project Cost Summary recently provided to City Council
including building construction costs, $16,736,162; signage, $80,000; and Kent County
Conservation District fee, $5,000.) Once the bid prices are accepted by City Council, the EDiS
contract will be amended to reflect a final guaranteed maximum price. If at the end of the
project, costs are under the guaranteed maximum price or budgeted contingency costs are not
used, the savings go to the City. The proposed contract stipulates that, if the project is bid and
the City decides to move to construction but not use EDiS as the Construction Manager, the City
would reimburse EDiS 10% of their fee, or $76,000. If the project does not advance to
construction, the City would only be obligated to pay the cost for the bidding in the amount
estimated at $17,100.
Staff recommended that the City Manager be authorized to enter into a "Construction Manager at
Risk" contract with the EDiS Company for bidding services, construction administration, and
construction of the Dover Public Library for the preliminary estimated amount of $16,821,162.
The contract is to include City Council approval of the final maximum guaranteed price based on
bidding results prior to construction.
Referring to the preliminary estimated amount of $16,821,162, Mr. DePrima explained that the
amount represents the current, estimated, maximum amount for the project and that after bidding
Paj 25
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 25
is completed, this amount will be amended accordingly.
Mr. Ruane moved to authorize the City Manager to enter into a "Construction Manager at
Risk" contract with the EDiS Company for bidding services, construction administration,
and construction of the Dover Public Library for the preliminary estimated amount of
$16,821,162; it is understood that the contract is to include City Council approval of the
final maximum guaranteed price based on bidding results prior to construction. The
motion was seconded by Mr. McGiffin and carried by a unanimous roll call vote.
FIRST READING - PROPOSED ZONING ORDINANCE AMENDMENTS
Council President Hogan reminded the public that copies of the proposed ordinances are
available at the entrance of the Council Chambers or can be obtained from the City Clerk's
Office. Since the ordinances are amendments to the Zoning Code, a public hearing is required.
Staff recommended referral of the amendments to the Planning Commission on December 20,
2010 and that a public hearing take place during the Council Meeting of January 10, 2011, at
7:30 p.m., at which time, final action by Council will take place.
Mr. Salters moved to refer the amendments to the Planning Commission on December 20,
2010 and set a public hearing before City Council for January 10, 2011 at 7:30 p.m., as
recommended by staff. The motion was seconded by Mrs. Russell and unanimously
carried.
Referring to Ordinance #2010-29, Mr. McGiffin requested that Subsection 8.17 - Maintenance of
Private Streets, include fire hydrants.
Mr. McGiffin moved to amend Ordinance #2010-29 by adding "fire hydrants" to
Subsection 8.17 - Maintenance of Private Streets. The motion was seconded by Mr. Bonar
and unanimously carried.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of
the Zoning Ordinance Amendments as read by the City Clerk, by title only, as follows:
> ORDINANCE #2010-28 - AMENDMENTS TO APPENDIX B - ZONING, ARTICLE 3 - DISTRICT
REGULATIONS, SECTION 14 - LIMITED CENTRAL COMMERCIAL ZONE (C-2A) AND SECTION
30 - RECREATIONAL AND OPEN SPACE ZONE (ROS)
> ORDINANCE #2010-29 - APPENDIX B - ZONING, ARTICLE 3 - DISTRICT REGULATIONS,
SECTION 8 - MOBILE HOME PARK ZONE (MHP)
Paj 26
CITY COUNCIL MEETING OF NOVEMBER 22, 2010 PAGE 26
COUNCIL MEMBERS ANNOUNCEMENTS
Mr. McGiffin reminded members to mark their calendar for June 25, 2011 for the next
African American Festival.
Mrs. Russell advised members that she will be participating in the Thanksgiving Dinner at 4:00
p.m. on Thursday, November 25, 2010 at the Dover Interfaith Mission, and that the Mission will
also hold a Christmas Dinner. She invited others to attend.
Mr. Bonar noted that today, November 22, 2010, marks the 47th Anniversary of the
Assassination of President John F. Kennedy, which was a life-changing moment for many.
Council President Hogan announced that the Christmas Tree Lighting Ceremony will be held on
November 29th at 6:00 p.m. and encouraged all to participate.
Council President Hogan wished Mrs. Russell and Mr. Bonar a Happy Birthday.
Mrs. Williams, along with several other members, wished everyone a Happy Thanksgiving.
By unanimous consent, the meeting adjourned at 9:26 P.M.
TRACI A. McDOWELL
CITY CLERK
All orders, ordinances, and resolutions adopted by City Council during their Regular Meeting of
November 22, 2010, are hereby approved.
CARLETON E. CAREY, SR.
MAYOR
/TM/jg
mag14BC.wpd
Exhibits Attached to Original Minutes and File Copy
Exhibit #1 - Presentation - Violation of Dangerous Building Ordinance - 35 N. New Street
Exhibit #2 - Letter from the Greater Dover Committee - Sale of Dover Public Library
Paj 27
EXHIBIT #1
Regular Council Meeting of 11/22/2010
Violation of Dangerous
Building Ordinance
35 North New Street
Public Services Department
Dover, Delaware
Paj 28
35 North New Street
Case History
Structure was subject of fire in 2002 and was condemned in
January 2003.
In 2007, building was registered vacant.
In 2008, City issued demolition permit, which has expired.
In September 2010 City performed interior inspection and found
unsecured windows. These windows have been boarded.
In October 2007 City performed interior inspection and
identified a number of concerns:
– Building is used for storage
– Structural concerns with flooring, interior walls and foundation
– Fire damage
Property has had numerous tall grass and weed and exterior
property maintenance violations.
Paj 29
Dangerous Building Code –
Chapter 22 Article XI, Sec. 22-381
(4) Fire damage, etc.
(5) Unfit for habitation.
(9) General welfare.
(12) Unoccupied buildings.
Paj 40
Recommended Council Action
Declare this building and all accessory buildings on the property
dangerous.
Order the property repaired or demolished by December 22, 2010.
Order the Building Inspector to cause the repair or demolition of
the structure if not completed by the owner within (10) days of the
date set by Council.
Order the City Manager with the assistance of the City Solicitor to
cause the cost of repairs or demolition to be charged against the
land on which the building exists as a municipal lien or cause such
cost to be added to the tax duplicate as an assessment, or to be
levied as a special tax, or to be recovered in a suit at law against
the owner.
Paj 41
EXHIBIT #2
Regular Council Meeting of 11/22/2010