Yo rale tèks sa a nan PDF la otomatikman, epi li ka gen erè. PDF la se dosye ofisyèl la, kidonk tcheke l anvan ou konte sou sa a.
Paj 1
CITY OF DOVER HISTORIC DISTRICT COMMISSION
AGENDA
THURSDAY, August 15, 2019 – 3:30 PM
City Hall – Conference Room
ROLL CALL
APPROVAL OF AGENDA
APPROVAL OF MINUTES OF MEETING on June 20, 2019
COMMUNICATIONS & REPORTS
1. Summary of Activity
a. Summary of Applications 2018 and 2019
b. Summary of Architectural Review Certifications for 2019
2. Department of Planning & Inspections Update
NEW APPLICATIONS - None
NEW BUSINESS
1. Review of Permits Referred to Commission
2. Presentation on Small-Cell Wireless Installations
3. Certified Local Government (CLG) Program
a. Status of FFY2018 CLG Grant
i. Report on Historic District Workshop Event of June 20, 2019
b. Update on FFY2019 CLG Grant Application Submission
4. Project for Dover’s 2019 Comprehensive Plan
a. Update on Project Activities
ADJOURN
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO
CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSION.
Agenda Posted: August 6, 2019
Paj 2
CITY OF DOVER
HISTORIC DISTRICT COMMISSION
June 20, 2019
The Regular Meeting of the City of Dover Historic District Commission was held on Thursday,
June 20, 2019 at 3:30 PM with Vice Chairperson Ms. Horsey presiding. Members present were
Mr. Street, Ms. Horsey and Mr. Czerwinski. Mr. McDaniel and Ms. Mason were absent.
Planning Office Staff members present were Mrs. Melson-Williams, Mr. Hugg and Mr. Swierczek.
APPROVAL OF AGENDA
Mr. Czerwinski moved for approval of the agenda, seconded by Mr. Street and the motion was
unanimously carried 3-0. Mr. McDaniel and Ms. Mason were absent.
ADOPTION OF MINUTES OF THE REGULAR HISTORIC DISTRICT COMMISSION
MEETING OF APRIL 18, 2019
Mr. Czerwinski moved for approval of the meeting minutes of April 18, 2019, seconded by Mr.
Street and the motion was unanimously carried 3-0. Mr. McDaniel and Ms. Mason were absent.
COMMUNICATIONS & REPORTS
Summary of Applications for 2018
Mrs. Melson-Williams stated that there have not been any changes. She does not believe the fence
will happen at 401 South Governors Avenue because another tenant has taken up that property
rather than the Doggy Daycare that originally sought the Fence Permit. The only application for
2019 is the Downtown Mural Project. The mural project on the property at 109-113 W.
Loockerman Street is not being pursued at this point and time. The other mural on the back of
Mitten and Winters is continuing to progress.
Summary of Architectural Review Certifications for 2019
Mrs. Melson-Williams stated that with the Summary of Applications there were 11 applications.
Eleven (11) permits through the end of May consist of interior renovations, exterior, roof and
Demolition Permits and signage. The Delaware State University Foundation is now the owner of
203 S. State Street also known as the Parsonage Building.
Mrs. Horsey asked if they were renting the building. Mrs. Melson-Williams replied they are the
owners. Mr. Hugg replied that to his understanding it was a donation for tax purposes. It was a
gift. Mrs. Melson-Williams stated that the only thing they have received is a Sign Permit.
Department of Planning & Inspections Update
Mrs. Melson-Williams mentioned that this afternoon there will be the City of Dover Historic
District Workshop Event at 4:00 p.m. Included in your packet were two updated events: the
Historic Preservation Symposium on June 26, 2019 and Delaware Department of Transportation
Public Workshop on the Bradford Street Streetscape Enhancements Project on June 24, 2019.
Paj 3
CITY OF DOVER HISTORIC DISTRICT COMMISSION JUNE 20, 2019
NEW BUSINESS
Review of Permits Referred to Commission.
Mrs. Melson-Williams stated that there was no review of Permits formally referred to Commission.
The office received one inquiry regarding a sign project. Staff had a meeting with the property
owner and sign company representative to discuss better options than their initial permit
submission. Another asked questions regarding an electronic message sign in the Historic District.
The initial recommendation is it is likely it would be referred to the Commission should the
application come in.
Certified Local Government (CLG) Program
Update on FFY2018 CLG Grant Application
Mrs. Melson-Williams stated that Staff provided a draft copy of the Historic Preservation
Chapter of the Comprehensive Plan to the SHPO (State Historic Preservation Office) as part of
the Grant. They have the opportunity to review and comment on the plan. They are also aware of
the Workshop that is being held today that is also in conjunction with the Grant. The Office
received the Grant Application for FFY2019 that will start July 1, 2019. She mentioned the
similar highlights of the application. The application is due July 15, 2019. The letter announcing
the grant funding opportunity identifies that the City is eligible to apply for $9238 which is then
matched by the City 60/40 and it would be $6159. The match does not have to be cash; it can be
in kind. Mrs. Melson-Williams’ initial thought for what the grant activities could be would be to
go back to looking to hire a consultant to work on the Design Standards and Guidelines. If the
Commission members have any other ideas, she asked them to let her know.
Mr. Czerwinski asked Mrs. Melson-Williams if she had enough resources. Mrs. Melson-
Williams replied that it would be going out for a consultant. Looking at the schedule could be a
little interesting because they will be wrapping up the Comprehensive Plan about the same time.
The application is due July 15, 2019. Technically, the Grant year starts on July 1st and ends on
June 30th the following year.
Mrs. Melson-Williams stated that other types of eligible Grant activities include: Historic
property surveys, National Register Nominations, other types of Preservation Planning
assistance, and outreach efforts. There is also funds for training for Staff and/or Interns. Money
was placed in the City budget request for the match. The Final Reading for the budget will be
held on Monday, June 24, 2019.
Mr. Hugg asked about the eligible amount. Mrs. Melson-Williams replied that they are eligible
for the amount based on population which is the minimum and beyond that it is based on the
amount that has to be regranted. It is then divided up proportionally which is explained in the
grant guidelines. The base award for the City of Dover would be $5000. The base award for New
Castle County and the City of Wilmington would be $7000. This year’s grant is between $2000-
$4000 which covers portion of her staff time to work on the Historic Preservation Chapter,
printing and mailing related to the workshop event. The Grant is due before the next Historic
District Commission meeting.
2
Paj 4
CITY OF DOVER HISTORIC DISTRICT COMMISSION JUNE 20, 2019
Project for Dover’s 2019 Comprehensive Plan
a) Update on Project Activities
b) Review of Working text Draft #1 – Chapter 6: Historic Preservation
Update on Project Activities
Mrs. Melson-Williams stated that Planning Staff have been actively working on text writing of
all the chapters and have set a goal to have a full draft of the plan for Staff Review in the next
two weeks. As a follow up to that, ultimately there will be a draft of the entire document released
at some point this summer to then start the formal review process that it will have to entail.
Mrs. Melson-Williams as previously mentioned the Historic Preservation Chapter that was
included in your packet titled “Copy for Workshop Review.” This is the same text that was
submitted the Historic Preservation Office for their comment through the Grant program. This is
an opportunity for the Historic District Commission members to read the chapter as we have
looked the goals and recommendations rather extensively for this chapter. If you have any
questions Staff would like to hear them. This will be available for members of the public that
come to the workshop.
Mr. Street moved to adjourn the meeting, seconded by Mr. Czerwinski and unanimously carried
3-0.
Meeting adjourned at 3:55 PM
Sincerely,
Maretta Savage-Purnell
Secretary
3
Paj 5
City of Dover Historic District Commission
Summary of Applications 2019
Updated thru July 31, 2019
FILE# PLAN NAME LOCATION TYPE ACTION STATUS
HI-19-01 Information on Downtown Dover; Presentation Informational Presentation and Information heard on grant funded Mural
Downtown Dover Potential Mural Consultation on Wall Preparation for project from Design Committee of
Mural Project Location at 109-113 S. Bradford St. elevation - HDC Downtown Dover Partnership; Property
W. Loockerman recommendation to not allow Owner to be advised that masonry wall
Street painting of an existing masonry wall should not be painted
HI-19-02 CLG Grant Certified Local Information File Notice of Eligibility for Grant Grant Application submitted; awaiting
Application for Government 6/14/2019; FFY2019 CLG Grant Formal Award Letter and Letter of
FFY2019 Application for Application submitted 7/11/2019 to Agreement; Grant Timeframe Summer
Grant Funding SHPO 2019-6/30/2019
Paj 6
City of Dover Historic District Commission
Summary of Applications 2018
Updated thru July 31, 2019
FILE# PLAN NAME LOCATION TYPE ACTION STATUS
HI-18-01 CLG Grant Certified Local Information File Notice of Eligibility for Grant Grant Application received; awaiting
Application for Government 3/15/2018; FFY2018 CLG Grant Formal Award Letter and Letter of
FFY2018 Application for Application submitted 5/11/2018 to Agreement; Grant Timeframe to be 7/1/18-
Grant Funding SHPO 6/30/19
HI-18-02 Referral of 12 Kings Highway Demolition Permit - Permit #18-1104 referred to HDC by Permit Application received 6/25/2018;
Demolition NE, Elizabeth W. Accessory Structure City Planner 7/5/2018 for consultation Additional Information received 7/9/2018
Permit #18-1104 Murphey School on Architectural Review Certification; enabled ArchRevCert to be granted: Permit
Accessory Applicant provided additional issued 7/10/2018; Update on Status to
Structure information to Planner; Planner HDC on 7/19/2018; Structure Demolished
issued ArchRevCert 7/10/2018
HI-18-03 Referral of Fence 401 South Fence Permit Permit #18-1207 referred to HDC by Permit application received 7/13/2018;
Permit #18-1207 Governors Avenue City Planner 7/18/2018 for HDC authorizes fence height and
consultation on Architectural Review recommends materials; Permit to be
Certification; Considered at issued subject to conditions of
7/19/2018 HDC Meeting - approval Architectural Review Certification. No
granted for 6 ft. height with activity for this potential user.
recommendations on fence material
Paj 7
City of Dover
July 11, 2019
Gwen Davis, Deputy SHPO
Division of Historical and Cultural Affairs
21 The Green
Dover DE 19901
Via Email: gwen.davis@delaware.gov
RE: Submission of Certified Local Government Grant Application (Request Funding for
FFY2019) from City of Dover, Delaware
Dear Ms. Davis:
The City of Dover, Delaware is pleased to submit for consideration our Certified Local
Government Grant Application for Funding for FFY2019 from the Historic Preservation Fund as
administered by the State Historic Preservation Office. As per the letter of June 14, 2019, we are
aware that the City of Dover is eligible to apply for a grant award for FFY2019 of $9,238 which
requires a minimum cash or in-kind match of $6,159 (40% of the project’s total cost). We have
proposed a project for an “Addendum to Design Standards & Guidelines for the City of Dover
Historic District Zone: Modern Materials & Technologies.” The project will seek to hire a
consultant to assist the Historic District Commission and Planning Staff to develop a Draft
Addendum document focused on the use and role of modern materials and construction
technologies in the Historic District. The Department of Planning & Inspections requested
$10,000 in Program Expenses for the grant project as part of the City’s FY2019-2020 Budget
review process to serve as the grant match. This amount was adopted as part of the City’s Budget
on June 24, 2019: Budget Line #100-10-16-21-000-52026.
The City’s Department of Planning & Inspections prepared this Grant Application and will serve
as the key point of contact for the grant and the project activities. The Department also serves as
staff to the City of Dover’s Historic District Commission. The Planning Office may be contacted at
(302) 736-7196. We look forward to working with your Office regarding this grant application as
part of the City of Dover’s participation in the Certified Local Government program.
Sincerely,
Department of Planning & Inspections
David S. Hugg III Dawn E. Melson-Williams, AICP
Planning Director Principal Planner
Enclosures: CLG Grant Application Packet with Attachments 1, 2, 2A, 3, Project Narrative,
and Historic District Map
CC: Planning Office File HI-19-02
Mayor Robin Christiansen via email
Donna Mitchell, City Manager via email
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Paj 8
Project Narrative FFY2019
Addendum to Design Standards & Guidelines for the City of Dover Historic District Zone: Modern
Materials & Technologies
The City of Dover is proposing a preservation planning project to evaluate and update portions of the
Design Standards & Guidelines for the City of Dover Historic District Zone document. The result of
the project will be a Draft Addendum document focusing on modern and technological advancements
in materials and construction activities of items discussed in the Design Standards & Guidelines.
The current Design Standards & Guidelines for the City of Dover Historic District Zone document
was created1 and adopted in 1992-1993 with the formal establishment of the City’s Historic District
Commission (HDC) by ordinance adopted July 26, 1993. The ordinances of the City of Dover allow
for the designation and protection of historic properties. The purpose of Historic District regulations
is:
“to preserve and enhance that unique character and value of the old portion of Dover as an area of
special charm and interest. It is particularly intended that the regulations prevent, in the historic district,
any change of conditions that would be deemed to be a disfigurement or degradation of the present
unique visual and architectural qualities of the district.” (Zoning Ordinance, Article 3, Section 21)
The geographic boundaries of the Historic District (H) zone are established as a zoning
classification. The original boundaries of the Historic District established in 1961 were generally
described as extending from just north of Division Street south to South Street inclusive of the
properties fronting on South State Street and The Green then east to the St. Jones River. In 1997, the
boundaries of the Historic District Zone were expanded to include properties fronting on West
Loockerman Street from Bradford Street to the railroad corridor and areas in the vicinity of South
Governors Avenue, South Bradford Street, North Street, and Bank Lane. The areas of expansion
included many commercial and residential properties listed in the National Register of Historic
Places as part of the Victorian Dover Historic District. See attached Map of City of Dover Historic
District showing the current boundaries (shaded in orange).
As a preservation and redevelopment tool, the Design Standards and Guidelines provide guidance
for property owners, design professionals, staff and the Historic District Commission (and Planning
Commission). The “historic district design guidelines and standards” are defined by the Zoning
Ordinance as follows:
“Historic district design guidelines and standards: The document adopted by the City of Dover
Planning Commission as being the source reference document for construction and maintenance of
buildings, structures, and additions with the Dover Historic District and which is the guiding document
for the historic district commission and city planner in their review of applications for architectural
review certification.”
Therefore, it is utilized as a guiding document in the decision making process of reviewing of
construction activities in the Historic District zone for issuance of Architectural Review
Certification (Zoning Ordinance, Article 10 Section 3). Applications for Architectural Review
Certification are reviewed by the City Planner (Staff), the Historic District Commission, and
Planning Commission. See the following code excerpt regarding the architectural review standards.
1
The current document Design Standards and Guidelines for the City of Dover Historic District Zone was prepared in
1992 by John Milner Associates Inc. with funding by a grant from the National Park Service, U.S. Department of the
Interior and administered by the State Historic Preservation Office. City Planning Staff, the State Historic Preservation
Office, the Friends of Old Dover, Main Street Dover, and other interested parties participated in the development of
the document.
Paj 9
Zoning Ordinance, Article 10 Section 3.25 Architectural review standards.
(A) An architectural review certificate may be issued if it is found that the architectural style,
general design, height, bulk and setbacks, arrangement, location and materials and
structures affecting the exterior appearance are generally in harmony with neighboring
structures and complementary to the traditional architectural standards of the historic
district as set forth in the historic district design guidelines and standards adopted by the
planning commission and as set forth in the United States Secretary of the Interior's
Standards for Rehabilitation.
(B) The city planner, historic district commission or planning commission shall not consider
normal maintenance and repair (see definitions, article 12), interior arrangement, or
building features not subject to public view.
The Zoning Ordinance references the Design Standards & Guidelines when establishing the
Architectural Review Certification process for the City of Dover’s Historic District zone (H). An
Architectural Review Certificate is required for a demolition, erection, reconstruction, alternation,
restoration or exterior repairs on properties within the Historic District. Most projects within the
Historic District are eligible for administrative review of the Architectural Review Certificate as
part of the Building Permit process for such projects as signs, roof and door or window
replacement, and exterior finish/siding/trim work renovations. Project activities only involving
interior renovations are not subject to the Architectural Review Certification process. For example,
in calendar year 2018, a total of forty-seven (47) applications (permit activity in the Historic
District) were reviewed under this process with 38 Permits requiring Architectural Review
Certification and 9 Permits not requiring Architectural Review Certification. 2
Historic Preservation Planning is part of a comprehensive approach to land use planning in the City
of Dover. In Dover’s current plan, the 2008 Comprehensive Plan (as amended) this information is
presented in Chapter 6 - Historic Preservation and associated Map 6-1. The 2008 Comprehensive
Plan includes sets forth goals and a series of recommendations for each goal. The Historic
Preservation Goals are as follows:
Goal 1: Preserve and Protect Historic Resources
Historic Goal 2: Provide and Promote Incentives for Preservation Activities
Preservation Goal 3: Increase Public Information on Historic Resources
Goal 4: Collaborate with Diverse Groups and Governments
2008 Comprehensive Plan, excerpt from Table 1-1: Plan Chapter Goals
To achieve Goal 1, one of the adopted Recommendations was the Evaluation of Design Standards
and Guidelines since the original document was adopted in the early 90s. The recommendation also
suggested consideration of the standards and guidelines for the levels of protection for The Green
and the Loockerman Street areas.
For this project for an Addendum to the Design Standards & Guidelines, the City of Dover will
seek to hire a consultant through a Request for Professional Services process to assist the Historic
District Commission and Planning Staff with the project. The consultant will be required to have a
Principal Investigator (PI) who meets the professional qualification standards in 36 CFR 61. Also
involved in the project, the Historic District Commission consists of five (5) appointed members
and the Planning Commission3 consists of nine (9) appointed members. The Planning Staff serves
as staff support to the Historic District Commission and will manage the activities of this project.
2
The volume of Permit Activity in the Historic District over the past five years has averaged 52 applications a year with
a majority of them eligible for Architectural Review Certification review by Staff.
3
The Planning Commission, per the Zoning Ordinance, Article 10 Section 3.25(A), is involved in the formal adoption
process for the Historic District guidelines.
Paj 10
With the project, we hope to create an Addendum to the Design Standards & Guidelines that
focuses on the modern and technological advancements in materials and construction activities. In
recent years, the use and role of alternative and composite materials in construction has increased
with options for wood composites, PVC/vinyl products, and others. In addition, features like solar
panels and other conservation related measures have become more common place. This Addendum
will focus on these types of materials and items as associated with the practices for maintenance,
preservation and construction activities within the Historic District. Components of the Addendum
document will continue to provide guidelines for treatment of historic properties and features
focusing on maintenance, repair, alternations, and preservation or restoration of existing buildings;
guidelines for new construction activities (additions and new buildings), guidelines for demolition
activities; guidelines for landscaping and site elements, and guidelines for signage. The document is
to be consistent with the Secretary of Interior Standards for Treatment of Historic Properties
(Rehabilitation Standards and Guidelines).
The project will consist of a series of phases: Planning, Public Outreach, Guidelines Revision and
Refinement, and Preparation of Draft Addendum Document. The following chart outlines the
anticipated activities of the project.
Timeframe Project Phase Activities and Products
September 2019 Consultant Services Develop RFP and release.
Select Consultant
September – October 2019 Planning Meetings with Consultant,
Staff and HDC to outline
general project approach,
goals and format for
Addendum guidelines,
determine public input
strategy.
November 2019 – January Public Outreach Analysis of guidelines.
2020 Conduct focus
groups/stakeholder meetings
and a Public Workshop.
January 2020 – April 2020 Guidelines Revision & Prepare example page format
Refinement (text and photographs).
Meetings with Staff and HDC
to present drafts. Review of
multiple Drafts by Staff, HDC.
May 2020 – June 2020 Preparation of Draft Conduct Public Workshop on
Addendum Document Draft. Review of Draft by
State Historic Preservation
Office.
The specific scope of work, tasks, and deliverables by the consultant will be further refined with
Planning Staff. Electronic copies of documents are anticipated for use at meetings and posting on
the City’s website for review. Subject to the selection of the consultant, the Project’s work
timeframe is expected to be September 2019 through June 2020 with the formal review process to
adopt the Draft Addendum Document to follow in Summer 2020 with the Historic District
Commission and Planning Commission.
Paj 11
Summary of Permit Applications with Architectural Review Certification
2019 - Updated Thru 7-31-2019
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
1/7/2019 18-2072 144 Kings Hwy SW, Building Permit - Building HDC Approval with Conditions on Construction of Kitchen Addition on
Governors Café Addition ARC 12/21/07: Application HI-17-04: west elevation. Project also subject
Staff Approval per ARC to Conditional Use C-18-01. Permit
issued.
2/11/2019 18-2115 201 W. Loockerman St. Building Permit - Interior Staff Approval. No ArchRevCert Interior renovations for café.
Renovation required for interior work. Project has a separate permit for
exterior work.
2/14/2019 19-131 108 E. Water St, Offices Building Permit - Interior and Staff Approval of ramp. No Interior renovations of office
Exterior Renovations ArchRevCert required for interior spaces; exterior work to
work. reconstruction portions of rear
accessibility ramp.
2/19/2019 19-159 401 Federal St, Townsend Roof Permit Not reviewed by Planning Staff. Roof replacement project with
Building Issued by Administrative Staff after similar/in-kind roof shingle
Building Code Review. materials.
2/25/2019 19-207 145 S. New St Demolition Permit - Interior Staff Approval for interior selective Interior demolition only. Project to
demolition. convert building to apartment units
is subject to a separate permit.
3/14/2019 19-94 306 S. State St., Law Offices Building Permit - Interior and Staff Approval. No ArchRevCert Interior renovations for offices.
Exterior Renovations required for interior work. Exterior work to improve access at
side rear entry door and rear fire
escape on south elevation.
4/29/2019 18-1927 145 S. New St Building Permit - Interior and Staff Approval. Interior renovations to fit-out for
Exterior Renovations four apartment units. Some exterior
changes related to windows and
doors. Staff worked with applicant
to bring project activities into
compliance with DS&G.
4/8/2019 19-354 54 S. State St, Presbyterian Temporary Sign Permit Staff Approval. Installation of vinyl banner from
Church of Dover 4/8/2019 to 4/22/2019.
Paj 12
Summary of Permit Applications with Architectural Review Certification
2019 - Updated Thru 7-31-2019
DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES
REVIEW CERTIFICATE
4/1/2019 19-387 305 W. Loockerman St., Sign Permit Staff Approval. Installation of window sign for new
Sold Out Sneakers (Retail retail store.
Store)
5/1/2019 18-2009 120 S. Governors Avenue, Building Permit Staff Approval. Pavilion structure in playground
Kent County Community area of Day Care Center. Limited
Action Agency visibility.
5/6/2019 19-653 203 S. State Street, Sign Permit Staff Approval Reface sign panel in existing
Delaware State University decorative pole sign at northwest
Foundation corner of building.
6/13/2019 18-767 Near 401 Federal St, Building Permit Staff Approval Replacement of Bus Shelter at
Townsend Building corner of Loockerman Plaza and
Federal Street.
7/12/2019 19-888 2 Kings Hwy, NE Fence Permit Staff Approval Replacement of fence across
interior of yard and fencing along
alley of property with metal picket
style fence.
7/10/2019 19-928 111 W. Loockerman St. at Temporary Sign Permit Staff Approval Installation of temporary sign on
rear, Duck Creek Printing east wall face from 7/10/2019 to
10/10/2019.
7/22/2019 19-987 420 S. State Street Window Permit Not reviewed by Planning Staff. Window replacement.
Issued by Administrative Staff only.
Paj 13
FY 2018 CERTIFIED LOCAL GOVERNMENT GRANT PROGRAM
Grant No. 10-18-161392-06 Start date: July 6, 2018 End Date: June 30, 2019
ATTACHMENT 1
CERTIFIED LOCAL GOVERNMENT GRANT PROGRAM
CLG GRANT PROGRESS REPORT FORM
Project: Historic Preservation Chapter of Comprehensive Plan: Dover
Grantee: The City of Dover
Grant Number: 10-18-161392-06
Reporting Period (check below):
□ Report 1 □ Report 2 □ Report 3
For July 6, 2018 – May 31, 2019
Specific Activities Accomplished during Reporting Period (July 2018 – May 31, 2019):
• Updates to Historic District Commission on Grant Project:
o Monthly Updates to the Historic District Commission on project at their meetings.
o Letter of Agreement for FFY2018 grant was received for signature and that the adopted
FY2018-2019 City Budget included the required cash match in the Planning Department’s
budget lines.
• Weekly meetings by Planning Staff Project Team for overall 2019 Comprehensive Plan Project.
• Dedicated page on City Website for 2019 Comprehensive Plan Project:
https://www.cityofdover.com/2019-comprehensive-plan
• Open House Event for 2019 Comprehensive Plan Project held August 23, 2018. Event included
poster display of Historic District maps and opportunities for public comment on displays and Focus
Area Maps.
• Research and text writing of Goals and Recommendations specific to Historic Preservation and the
Historic Preservation Plan chapter (Fall 2008 -Winter 2019).
• DRAFT Chapter 6: Historic Preservation Plan document submitted for review by HCA Staff on June
7, 2019 via email. (Titled Working Text Draft #1 – 4.10.2019 Copy for Grant Review Chapter 6 –
Historic Preservation Plan.) Awaiting comments.
• Historic District Workshop Event is being planned for June 20, 2019.
Overall Progress to date:
• Summer – Fall 2018: Evaluation of 2008 Goals and Recommendations by Historic District
Commission and Planning Staff for updating.
• Comprehensive Plan Project updates to City Council in October 2018 and April 2019; monthly
updates and review draft items with Planning Commission and Historic District Commission.
• Preliminary Draft #2A of Goals and Recommendations released on February 28, 2019 for general
review.
• Project Team Meetings held weekly to discuss document and text format, development of maps, data
gathering efforts, and reports on other meetings with City Departments, agencies and other local
governments.
• Research, data gathering, and text writing is an ongoing task.
• First Working Drafts of Chapters for Staff review only in March 2019 (internal Staff comment only).
• Development of Implementation Plan Chapter with items from each chapter topic area including
Historic Preservation in April 2019 (Staff Working DRAFT only).
• Public Outreach Workshop Event being planned for June in conjunction with Historic District
Commission’s monthly meeting.
1
Paj 14
FY 2018 CERTIFIED LOCAL GOVERNMENT GRANT PROGRAM
Grant No. 10-18-161392-06 Start date: July 6, 2018 End Date: June 30, 2019
Problems Affecting Progress:
• Some limitations on available Staff time for Comprehensive Plan Project work and its complexity.
Also impacts from Planning Office regular workload of applications, permitting, budget preparation,
and Staff medical/vacation leave absences.
• Overall Project moving more slowly than initially expected.
Schedule Status:
• In the next steps, Staff will be coordinating the Historic District Workshop Event to be held on June
20, 2019. This includes direct mailing announcement to property owners within the Historic District,
development of handout information on “Historic Districts,” preparation of display maps, gathering
of other information (existing brochures) for distribution, and a PowerPoint presentation.
• A copy of the Working Text Draft #1 – 4.10.2019 Copy for Workshop Review Chapter 6 – Historic
Preservation Plan is to be made available at the Workshop for review and comment.
• Any comments on the Historic Preservation Plan Chapter received from HCA Staff will be
incorporated into future DRAFTs of the Plan documents.
Other Pertinent Information:
• Next (Final) Report to include documentation of project work hours by Staff throughout the project
year and the supply costs associated with Workshop Event for Reimbursement Request.
• The 2019 Comprehensive Plan Project is ongoing with the full DRAFT document expected to be
released for public comment and formal review in Fall 2019. The new Plan must be certified by
February 2020.
Reimbursement Request Attached: Y N
Submitted By: Date: 7/1/2019
2