CITY OF DOVER PLANNING COMMISSION
SEPTEMBER 16, 2019
The Regular Meeting of the City of Dover Planning Commission was held on Monday,
September 16, 2019 at 7:00 PM in the City Hall Council Chambers with Chairperson Dr. Jones
presiding. Members present were Mr. Adams, Mr. Roach, Ms. Edwards, Mr. Baldwin, Mr.
Tolbert, Mrs. Welsh, Ms. Maucher and Dr. Jones. Mr. Hartman was absent.
Staff members present were Mr. Dave Hugg, Mrs. Dawn Melson-Williams, Mr. Julian
Swierczek, Mr. Jason Lyon and Mrs. Kristen Mullaney. Also present were Mr. Jonathan Street,
Mr. Jason Munyan and Mr. Bill Krapf.
APPROVAL OF AGENDA
Ms. Maucher moved to approve the agenda as submitted, seconded by Mrs. Welsh and the
motion was unanimously carried 8-0 with Mr. Hartman absent.
APPROVAL OF THE PLANNING COMMISSION MEETING MINUTES OF AUGUST
19, 2019
Mrs. Welsh moved to approve the Planning Commission Meeting minutes of August 19, 2019,
seconded by Mr. Roach and the motion was unanimously carried 8-0 with Mr. Hartman absent.
COMMUNICATIONS & REPORTS
Mr. Hugg stated that the next Planning Commission regular meeting is scheduled for Monday,
October 21, 2019 at 7:00pm in the City Council Chambers.
Mr. Hugg provided an update on the regular City Council and various Committee meetings held
on September 9 and 10, 2019.
Mr. Hugg stated that they are trying to get the Comprehensive Plan together in a form that they
can submit to the State Planning Office for PLUS Review on October 1, 2019. They also
continue to operate at a minimum staffing although they do have three applications for the vacant
Planner position that they hope to deal with shortly. They will also soon be posting two position
announcements for an Inspector and for a Code Enforcement Officer.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the
meeting.
OLD BUSINESS
1) Requests for Extensions of Planning Commission Approval: None
NEW APPLICATIONS
1) S-19-19 Delaware Solid Waste Authority Administration Building at 601 & 801 Energy Lane
– Public Hearing and Review of a Site Development Plan and Lot Consolidation Plan
1
Paj 2
CITY OF DOVER PLANNING COMMISSION SEPTEMBER 16, 2019
Application to construct a two-story 23,487 SF office building with associated site
improvements. The subject properties to be combined total 7.3343 +/- acres and are located
north side of Energy Lane east of Bay Road. The submission will be subject to a Performance
Standards Review Application. The properties are zoned IPM (Industrial Park and
Manufacturing Zone). The owner of record for both properties is Delaware Solid Waste
Authority. Property Addresses: 601 and 801 Energy Lane. Tax Parcels: ED-05-077.00-03-
04.00-000 and ED-05-077.00-03-05.00-000. Council District 2. Waiver Requests: Partial
Elimination of Curbing, IPM Planned Industrial Park: Alternative Design Standards - Rear
Setback Requirement. The subject site is Lots 4 and 5 of the Northgate Center originally
subdivided with Application SB-05-05 Stover Professional Campus with Planning
Commission approvals in September and November 2005.
Representatives: Mr. Jonathan Street, Becker Morgan Group; Mr. Jason Munyan, Delaware
Solid Waste Authority
Mr. Swierczek stated that this is a review of a Site Development Plan and Lot Consolidation Plan
Application to construct a two story 23,487 SF office building with associated site
improvements. The overall site was originally subdivided with application SB-05-05 Stover
Professional Campus with Planning Commission approvals dating to 2005. That Record Plan
subdivided the original tract into twelve lots of which these are Lots 4 and 5. Consolidating these
lots would total 7.3 acres. Site Plan S-16-11 developed the parcels that were originally Lots 6-12
to the south of the site as the new Chesapeake Utilities Office. In their application, the applicant
has noted two waiver requests with their plan. The first waiver request is from the Zoning
Ordinance, Article 6, Section 3.6b requiring upright curbing for all parking areas and access
drives, stating that curbing will not benefit or enhance the conveyance of stormwater runoff.
Staff has approved that request to partially eliminate the upright curbing requirement for the
office building. The second waiver request is for the Alternative Design Standards, specifically
the reduction of the rear yard setback. Staff has recommended approval of this waiver by the
Planning Commission as the applicant has stated that while the majority of the planned building
complies with the more restrictive setback, there is approximately a 40 foot wide section that
encroaches into the setback. The waiver is sought as the neighboring property is zoned RG-2
(General Residence Zone). The site of the Blue Hen Apartments contains a stormwater
management pond and wooded areas where abutting the section of the proposed development
along Energy Lane. Also, in accordance with Zoning Ordinance Article 5, Section 8.6, this
development is required to go through the Performance Standards Review. A letter was
submitted by the applicant for the Performance Standards Review and was included in the
packets for review by the Planning Commission. Just as a reminder to the members of the
Planning Commission, Commission members should act upon the request for waivers as well as
the Performance Standards Review Application as part of any motion regarding this project or as
a separate motion as necessary.
Mr. Adams recused himself from this project because he has a business relationship with the
Delaware Solid Waste Authority.
Mr. Street stated that the renderings on the screen show a graphic of the Site Plan as it is laid out
today. There are a couple of easements to deal with on the site. They are moving some sewer
2
Paj 3
CITY OF DOVER PLANNING COMMISSION SEPTEMBER 16, 2019
which is the diagonal shaded area shown on the rendering. They are purposing something
additional to the project in conjunction with something that Chesapeake has recently done. They
have some type of multi-modal walking path that will be interconnected between our site and the
Chesapeake site; and they are looking at opportunities to actually connect to Tudor Industrial
Park site which is back and to the right of their site through the woods. That is something that
they have to research a little further but that is something that they are trying to add to the site.
They are going for the LEED certification on the building and the site itself. The presentation
also shows a nice symmetric view of the front of the building. These are our renderings as they
stand now and from their recent meetings with the Delaware Solid Waste Authority; they don’t
intend on these changing at all. There are random variable sloping roofs and a green roof on the
back. The rear of the building is what the neighbors in the Blue Hen Apartments would be
seeing. That small section of sloped roof on the right side of the image is actually what is
projecting into that setback that they have requested relief from. For the record, they would like
to clarify in the design that they have 23,487 SF as the building square footage, but he would like
to increase that a little bit to 23,600 SF. That allows them a little bit of room to play. They don’t
intend for the building to change anymore but they wanted to update that square footage to make
sure that it is correct. They are in agreement with the DAC Report and they have no questions for
Staff.
Dr. Jones opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Tolbert questioned if the application was in compliance with the Performance Standards
Review Application requirements? Responding to Mr. Tolbert, Mr. Swierczek stated that the
letter that was included with the packets was basically required as the zoning is of an industrial
nature. It was on the part of the applicant to attest that there would be no pollutants or any kind
of detrimental effects on part of this development to the neighboring community. As the
development proposed is for an office building, Planning Staff is satisfied with its content.
Ms. Maucher questioned if the motion would need to include approval of the Performance
Standards Review Application? Responding to Ms. Maucher, Mrs. Melson-Williams stated yes.
Ms. Maucher moved to approve S-19-19 Delaware Solid Waste Authority Administration
Building, including the waiver for the partial elimination of curbing and the alternative design
standard rear setback requirement as well as the approval of the Performance Standards Review
Application and the DAC comments, seconded by Mrs. Welsh and the motion was carried 7-0 by
roll call vote with Mr. Adams recused and Mr. Hartman absent. Ms. Maucher voting yes; based
on DAC recommendations and Staff recommendations. Mr. Roach voting yes; based on reasons
previously stated. Ms. Edwards voting yes; based on Staff recommendations and that is a nice
looking building and she thinks that it is going to be a really great addition to that side of town.
Mr. Baldwin voting yes; based on Staff recommendations. Mr. Tolbert voting yes. Mrs. Welsh
voting yes; the building is beautiful and is very nicely done. Dr. Jones voting yes; based on Staff
recommendations and the DAC Report.
2) S-19-20 Delaware State Police Building Update at Bay Road Commercial: 560 and 600 Bay
Road – Public Hearing and Review of a Revision to Site Development Plan S-17-20. The
3
Paj 4
CITY OF DOVER PLANNING COMMISSION SEPTEMBER 16, 2019
Plan Revision replaces the two buildings previously proposed as a 70,646 SF grocery store
and a 17,664 SF multi-tenant retail building on the west side of the site with the construction
of a one-story 62,667 SF office building and associated site improvements. The subject
properties total 12.9366 +/- acres and are located on the southwest side of Bay Road. The
property is zoned C-4 (Highway Commercial Zone). The owner of record for both properties
is Bayroad CAP, LLC. Property Addresses: 560 and 600 Bay Road. Tax Parcels: ED-05-
077.00-01-10.00-000 and ED-05-077.00-01-09.00-000. Council District 2. Waiver Request to
Reconfirm: Reduction of Arterial Street Buffer. For Consideration: Tree Mitigation Plan.
Application S-17-20 Bay Road Commercial was previously approved by the Planning
Commission in July 2017 and received Final Plan Approval on July 23, 2019.
Representatives: Mr. Jonathon Street, Becker Morgan Group; Mr. Bill Krapf, LC Management
Mrs. Melson-Williams stated that this application may look familiar to some of the Commissioners
as it was previously known as Bay Road Commercial. It went through the Planning Commission
review in July 2017 and actually within the last month and a half, got Final Plan Approval for what
was really a shopping center development project. However, this new application has made a change
to what is the westernmost building on the property which previously was intended to be a grocery
store and a multi-tenant building. With this proposal, that building has now changed into a large
office building with an estimated square footage of 62,677 SF. The other buildings on the site and
the general overall layout of the site remain the same with two kind of outbuildings closest to Bay
Road to be restaurants and then the other building to be another multi-tenant building probably
targeted more on the retail and commercial side. The property is zoned C-4 (Highway Commercial
Zone) so development activities are subject to those Bulk Standards. With this project, she will note
a couple of things and the differences between the previous plan and the one that we are seeing now.
With the building change, the overall building floor area has decreased for the project. The total lot
coverage for the site has decreased for the project; however, the number of parking spaces on the
property has increased. With the office building, it would follow the parking requirements for C-4
(Highway Commercial Zone) which is based on the rate of one space per 300 SF. The same would
carry true for the retail building. For the restaurants; however, their parking is based on a seat count
provision so they have kind of estimated what those seat counts would be since the restaurant tenants
are unknown. Bottom line, the estimate for required parking at this point with the new format to this
plan would be a total parking requirement of 445 parking spaces. Their plan as shown is providing
790 parking spaces. The project does include loading space areas, dumpster locations servicing
buildings, and the start at compliance for the bicycle parking for the site as well. Access to the site
remains the same with this office building which is described as kind of a Phase I area. Access
would be traveling from Bay Road onto what is the Bay Court Plaza entrance drive and then the two
western most entrances from that Bay Court entrance drive onto this Bay Road Commercial site
would be what would be constructed in Phase I. That brings you in kind of flanking the proposed
office building. There is a right in/right out proposed off of Bay Road but that would be developed in
a likely later phase of construction activity. The property includes plans for sidewalks along the Bay
Road frontage and also along the northern edge of the Bay Court entrance drive. Part of that
sidewalk area does actually exist today but with their project improvements would be reconstructed.
The western part of that constructed with the Phase I and the new points of access to happen with
that.
4
Paj 5
CITY OF DOVER PLANNING COMMISSION SEPTEMBER 16, 2019
The screen showed the architect’s rendition of the new western office building that is proposed there.
The parking configuration shown in this rendering isn’t quite what is shown on their plan but the
architecture of the building basically shows a one story building, a variety of masonry and other
siding materials for the building. There are a series of windows and then key entry points are then
capped by a hanging canopy over those direct areas. With this project, there is a waiver that was
previously approved. There was previously a reduction in the Arterial Street Buffer for the overall
site. That Arterial Street Buffer is typically thirty feet in width. It was reduced previously by the
Planning Commission to a 20-foot width. With a new Revised Plan, there are no changes in that area
so they just ask that the Planning Commission reconfirm that previously issued waiver. With this
project, they are seeking a consideration of what is a Tree Mitigation Plan for this project. They are
proposing to locate a series of trees along the Bay Court entrance drive; however, it would be located
on the Bay Court property rather than their own because of the location of utility lines and other
underground utility items in that area of their property. It does go to the intent of creating more of a
tree lined entrance way. If you remember correctly, this entrance drive isn’t located on their
property, it is located on the adjacent property to the south which is why they would have to ask for
what is technically called in our Code a Tree Mitigation Plan which occurs when you are planting
trees to meet your planting requirement not on your property but on a property elsewhere in the City.
In this case, elsewhere in the City is just a few feet to the south on the adjacent property. With the
DAC Report, the Planning Office provided the Plan Review comments. They did in the
Recommendations Suggested for Additional Considerations noted that Staff continues to support the
Arterial Street Buffer reduction from the 30 to 20 feet. They also recommend approval of the request
to locate the series of trees onto that adjacent property to create that entrance drive provided that the
adjacent property owner grants permission to do so. The other comment that they have made is in
regards to parking. Per their DAC Report, on Page 9 they recommend careful evaluation of the
traffic circulation for the Revised Phase I area and the evaluation of the proposed amount of parking
for the overall project. They note that there are certainly some opportunities to re-evaluate the
configuration of parking in this area, they think, to create a simpler traffic pattern in that area
immediately in front of this office building. The DAC Report also includes the comments from the
other regulatory agencies including the Public Works Office, the Fire Marshal’s Office, DelDOT and
the Kent Conservation District. Even though they have an approved plan for the project, you may
start to see activities for site improvements because they do have to do tree clearing. Those activities
may get underway under what they currently have as an approved plan but to do anything to
construct the west Phase I as an office building, we need to take care of the application for Site Plan
that is before the Commission tonight. It is a Site Plan with two waivers: the renewal of the
reduction of the Arterial Street Buffer and the Tree Mitigation Plan Request to plant the trees on the
adjacent property.
Mr. Street stated that what you see before you is the line of Phase I and to the left side of that what
you are looking at is the extent of the revision. Everything in Phase II essentially is what it was
before. As Staff has discussed, basically due to fall through in a lease agreement, they had to go for
what they would consider a better tenant for this phase of the project. They are moving forward as
quickly as they can to get this underway. The site itself has not changed that much with the
exception of the building and some layout in regards to the building itself. He does want to make a
clarification for the office building itself will have a total square footage of 62,900 SF as a buffer of
what they submitted six weeks ago. They were in the early stages of refining that design. They are
not doing the architecture but he was in contact with the architect this morning and he gave him the
5
Paj 6
CITY OF DOVER PLANNING COMMISSION SEPTEMBER 16, 2019
updated number. It’s fine to be over but it’s not fine to be under when they go to pull the Permit
itself. With the exception of the building itself, the site really maintains what they had originally
intended. As Dawn said, the Tree Mitigation that they are talking about is on the bottom part of that
page; it’s a line of twenty some trees. They don’t see it being an issue for the neighboring owner to
approve this Mitigation Plan as it is the same owner. With that, they have read through Staff’s
Report itself and the other DAC comments from the other agencies and they don’t have any real
questions or problems with the recommendations or comments made by the agencies with the
exception of one unfortunately. It’s the third one where they talk about parking and further
consideration of a parking arrangement of what is Phase I. As it is stated on the application itself,
these are going to become renovated offices for the State Police. Working in conjunction with our
plan, the developer and the State Police, this is the arrangement, orientation and layout that they
have all come together to agree on. They request that Number 3 be moved to Advisory. He
understands what Staff is talking about but this kind of goes deeper than just what they want. On
their side, they are dealing with multiple agencies and owners, developers and tenants. This is what
they have seen, this is what they like and this is what they have approved. They would request that
Number 3 be moved to the Advisory Comments as to not become a requirement for the application
itself.
Mr. Adams questioned what the Delaware State Police plan to use this building for today or in the
future? Responding to Mr. Adams, Mr. Street stated that essentially what they are doing is moving
from across the street. They have multiple agencies with their offices and support staff. He is not
sure what publicly he can disclose but there is a secure section of the building which handles a lot of
their response teams. This is not a Troop; it is basically their offices and support staff supporting the
State Police themselves.
Mr. Adams questioned the change that Mr. Street wanted made moving to Advisory? Responding to
Mr. Adams, Mr. Street stated that Recommendation Number 3, himself and Staff had multiple
conversations about how the parking is arranged in front of the building. Staff made a
recommendation offline talking about the project itself. They looked into kind of rearranging the
parking itself so that it’s not facing the building at a 45 degree angle and so that the travel lanes
aren’t at a 45 degree angle; essentially opposite of what you see. The travel lane would run with the
building not into the building for all of the parking. One thing that this does is make this more
appropriate for a retail frontage of a building. You have parking along the curb and you’ve got
multiple drive isles facing or entering into the building so to speak. One thing is that they are trying
to keep this versatile for the parcel itself as the State Police will be there as a lease. They are still
trying to plan for the future and keep the parking and the area itself versatile so that they can use that
in the future if needed.
Dr. Jones opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mrs. Welsh questioned if Staff had any issues with the reclassification of the parking as an Advisory
Comment? Responding to Mrs. Welsh, Mrs. Melson-Williams stated that it could certainly become
an Advisory Comment. She thinks that if you look at the language and how it was written on Page 9,
they didn’t say “you must”. They recommended careful evaluation of the traffic circulation. They
offered that there may be a variety of ways to approach that, not locking them into any one in
6
Paj 7
CITY OF DOVER PLANNING COMMISSION SEPTEMBER 16, 2019
particular. They basically made the recommendation because they think that there is potential for a
better project when it comes to the parking aspect. There are two aspects of parking: one is the
circulation in that Phase I area and the other is the overall amount of parking that this project is now
being shown with. They note again, the increase in parking while the total square footage for the site
has actually been reduced. Those are just food for thought type of things. The Recommendations
section is meant to look more carefully at the objectives for considering Site Plans. They felt that
with dealing with the safety matters with vehicular traffic on the site, they thought that it was in our
interest to put that forward as a Recommendation to evaluate. They can certainly evaluate and say
that they have evaluated our options and due to our tenant and lease provisions it is not feasible. It
depends on how you want to interpret what Staff said there.
Mr. Adams moved to approve S-19-20 Delaware State Police Building Update at Bay Road
Commercial: 560 and 600 Bay Road as submitted to include the two waivers: the Arterial Street
Buffer that was previously approved and the Tree Mitigation Plan that was requested as part of this
application and a continued conversation around the parking change and moving that parking
change to the Advisory Comments but also encouraging the applicant to continue to work
cooperatively with Staff to make that happen, seconded by Mrs. Welsh and the motion was carried 8-
0 by roll call vote with Mr. Hartman absent. Mr. Adams voting yes. Mr. Roach voting yes; he asks
that the applicant continue to work cooperatively with Staff and try to rectify the issues in regards to
parking to meet both needs for Staff and the applicant. Ms. Edwards voting yes. Mr. Baldwin voting
yes. Mr. Tolbert voting yes. Mrs. Welsh voting yes. Ms. Maucher voting yes; based on Staff
recommendations. Dr. Jones voting yes; based upon Staff recommendations.
NEW BUSINESS
1) Appointment of the Architectural Review Oversight Subcommittee of Planning Commission
(in accordance with Zoning Ordinance, Article 10 §2.28)
Mrs. Melson-Williams stated that at the last meeting, the Commission accepted the appointments
of Mrs. Welsh and Ms. Maucher to be the Planning Commission member representatives and you
directed Staff to reach out to the previous Design Professionals that had served on that
Subcommittee. They have not had the opportunity to do that so they ask that this item be continued.
They will try to get that taken care of for you.
2) Project for Dover’s 2019 Comprehensive Plan
a. Update on Project Activities
Mrs. Melson-Williams stated that they have been giving the Commission updates on project
activities and the news that she has today is perhaps the most significant in a long time. The
release of a Draft Plan is imminent in that they will be looking to make a submission to the
PLUS Review Process which is the Preliminary Land Use Services Review Process with the
Office of State Planning Coordination. For a project update, they are basically in the final review
and editing of what they call a Staff Draft of the document. The released it as a complied
document to Planning Staff and to City Department Heads in mid-August. They have slowly had
comments coming back in and they have been trying to manage those and make updates to the
various chapters to reflect those comments. They are working with the City’s GIS Department on
7
Paj 8
CITY OF DOVER PLANNING COMMISSION SEPTEMBER 16, 2019
maps. There is a whole series of a dozen or so maps that are associated with the Comprehensive
Plan. Over the last year, there have been a couple of those maps issued as Preliminary Drafts but
there are additional tweaks to those. They have issued a Land Development Plan Map and two
maps associated with Annexation; both an Annexation Area and an Annexation Area Land Use
Map. Both of which have had some minor tweaks as they met with their adjacent jurisdictions
and did additional refinement with the Planning Staff review process. The key things that she
wants to note to the Commission is if you trust Staff enough to go ahead and submit a Draft to
PLUS. With that, that is going to be our introduction to the public of our initial draft of the
Comprehensive Plan and its Map Series. In the month of October, you will see them pushing that
to the public for them to start to get their initial look. With that, they are planning for another
Open House Event on October 23rd. It will be a late afternoon or early evening event for people
to come learn about, take views of the Plan Maps and get a look at the Draft document. They are
also thinking of a Visitation during the day on the following day to capture opportunities for all.
To start to see at least on the public side what this document looks like. They will be updating
the City Council at the Committee of the Whole Meeting next week and they will actually
provide to them Chapter 15 which is the Implementation Plan. The first pieces of that
Implementation Plan is to release a Draft, go to PLUS and then start the formal public review
process. She would certainly encourage any endorsement of Staff proceeding to the PLUS filing.
They do have the City’s website that has a page dedicated to the Comprehensive Plan and when
it is released publicly it will be posted there. They are anticipating that part of your October
meeting will be a little bit more of a formal introduction to that Draft so that the Commission
really starts to understand all of the components of it. It will not be the public hearing or formal
review process but at least a pretty good introduction for what is out on the street for initial and
more complete public review of the document.
Mr. Hugg stated that he thinks Mrs. Melson-Williams has covered it quite well. They look
forward to the Commission’s continuing input. It has been a somewhat long and arduous process
to get as to the point to where we are but he thinks that they have a very good document that just
needs some good editing and house cleaning before they can submit it.
Mr. Tolbert questioned if a copy of the Draft Plan would be on the City’s website? Responding
to Mr. Tolbert, Mrs. Melson-Williams stated yes, the entire Plan. They have to make a
submission of the entire plan document meaning all fifteen chapters. The Commission has seen
the Goals and Recommendations for the chapters in the past year and there is also a series of
about twelve maps. That entire document must be submitted to PLUS and when that is done,
they will post that entire document on the City’s website on our Comprehensive Plan Project
Page. They will probably set it up so that if you only wanted to read certain chapters you could
pull down a chapter but the document will be there electronically. Staff will give the
Commission at least a synopsis presentation at the October meeting. If you would like a full
printed copy of the document, Staff can provide that to you as well.
Ms. Maucher questioned with the PLUS Review, will there be a second review if there are
changes recommended after the first review? Responding to Ms. Maucher, Mr. Hugg stated that
the PLUS Review is primarily the State Agency’s review of the document. He suspects that they
will have both text and map questions or comments and they may have questions relating to the
ultimate certification of the Plan. Once they get those comments back, they will do kind of an
8
Paj 9
CITY OF DOVER PLANNING COMMISSION SEPTEMBER 16, 2019
editorial review of the Comprehensive Plan based on the PLUS comments and address any
certification issues. They will simultaneously be doing the Public Workshop and ultimately a
presentation and approval by the Planning Commission and a presentation and approval by City
Council. The State will get one more crack at it once it’s approved by City Council and then
there is a certification process.
Mrs. Melson-Williams stated that by issuing it to PLUS it becomes a public document so they
are looking to take that month as an opportunity to really introduce the public to the document.
The PLUS Review process does garner comments from various State Agencies. They may find
data corrections that need to be made. They also at the other end of that extreme would be what
they call “certification issues” meaning that there is material or parts of the Plan that could not be
certified ultimately by the Governor. When that happens, it becomes what do you have to do to
fix it and its somewhat of a negotiation process depending on what that certification comment is.
They are trying to avoid those but they will see.
Mrs. Welsh moved to approve and support the PLUS submission based on the DRAFT proposals,
seconded by Mr. Tolbert and the motion was carried 8-0 by voice vote.
Meeting adjourned at 7:55 PM.
Sincerely,
Kristen Mullaney
Secretary