CITY OF DOVER PLANNING COMMISSION
March 21, 2016
The Regular Meeting of the City of Dover Planning Commission was held on Monday, March 21,
2016 at 7:00 PM with Chairman Mr. Tolbert presiding. Members present were Mr. Holden, Mr.
Cregar, Mr. Holt, Mr. Baldwin and Mr. Tolbert. Colonel Welsh, Dr. Jones, Ms. Still and Mr.
Ambruso were absent.
Staff members present were Mrs. Ann Marie Townshend, Mr. Jason Lyon, Mr. Bill Cook, Mr.
Eddie Diaz and Mrs. Mullaney. Also present was Mr. Jon Falkowski, Ms. Carol Ohm, Mr. Michael
Maupin, Mr. James Burgess, Ms. Dana Sawyer, Mr. Allen Henson, Mr. Dale McCalister, Mr.
Joseph Lazorick, Mr. Raymond Harbeson Jr., Mr. Alex Schmidt and Mr. Douglas Barry. Speaking
from the public was Mr. Thomas DiSabatino, Mr. Dan Maler and Mr. Richard McKee.
APPROVAL OF AGENDA
Mr. Cregar moved to approve the agenda as submitted, seconded by Mr. Holt and the motion was
unanimously carried 5-0 with Colonel Welsh, Dr. Jones, Ms. Still and Mr. Ambruso absent.
APPROVAL OF THE PLANNING COMMISSION MEETING MINUTES OF FEBRUARY
16, 2016
Mr. Holt moved to approve the Planning Commission Meeting minutes of February 16, 2016,
seconded by Mr. Baldwin and the motion was unanimously carried 5-0 with Colonel Welsh, Dr.
Jones, Ms. Still and Mr. Ambruso absent.
COMMUNICATIONS & REPORTS
Mrs. Townshend stated that the next Planning Commission meeting is scheduled for Monday, April
18, 2016 at 7:00pm in the City Council Chambers.
Mrs. Townshend provided an update on the regular City Council and Utility Committee meetings
held on February 22 & 23, 2016 and March 14 & 15, 2016.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Townshend presented the audience information on policies and procedures for the meeting.
OLD BUSINESS
1. Requests for Extensions of Planning Commission Approval:
A. S-14-08 Woodland Tree Clearing Plan of 560 Bay Road – Request for one year extension of
Planning Commission approval granted on April 21, 2014 to the Site Development Plan to
permit the clearing of approximately 7.45 acres ± of trees (woodland) on a 12.67 acre ±
parcel. This included approval of the waiver request to permit the tree clearing to exceed
50% of the woodland on the property at 560 Bay Road and to accept the Woodland (Tree)
Mitigation Plan at the Anne McClements Woodland Tract (Fork Branch Nature Preserve)
previously approved by the Planning Commission on April 19, 2010 with Application S-10-
03 South Dover Plaza. The Woodland Mitigation Plan was implemented and completed by
October 2013. The property is zoned C-4 (Highway Commercial Zone). The property is
located on the southwest side of Bay Road. The owner of record is S H E Holdings, LLC.
1
Paj 2
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
Property Address: 560 Bay Road. Tax Parcel: ED-05-077.00-01-10.00-000. Council District
2.
Representatives: None
Mrs. Townshend stated that this was a Site Plan application for woodland clearing of property at
560 Bay Road. When this application came to the Commission two (2) years ago, the mitigation
associated with this has already been completed at McClements Nature Preserve but the clearing
has not yet taken place. The applicant has requested a one year extension.
Mr. Cregar questioned if Staff knew what the hold-up was on this? Responding to Mr. Cregar, Mrs.
Townshend stated no, she knows they have talked to the property owner about potential
development but the clearing has not yet taken place; the mitigation has taken place.
Mr. Cregar moved to approve S-14-08 Woodland Tree Clearing Plan of 560 Bay Road for a one
year extension, seconded by Mr. Baldwin and the motion was unanimously carried 5-0.
2. Revise Plan Information:
A. C-13-11 Dover Christian Church at 1738 Forrest Avenue – Information on Revisions to
Conditional Use Site Plan for construction of a one story 9,600 SF place of worship (church
building) and associated site improvements. The proposed Revisions consist of reduction of
building size, reduction of number of parking spaces, reduction of impervious coverage,
revision to type of stormwater management facility and revisions to building architecture and
materials. The existing residence on the property is proposed for demolition. The property is
1.5576 acres and is zoned R-10 (One Family Residential Zone) and subject to the COZ-1
(Corridor Overlay Zone). The property is located on the south side of Forrest Avenue and
west of Dover High Drive. The owner of record is Dover Christian Church, Inc. Address:
1738 Forrest Avenue. Tax Parcel: ED-05-075.00-01-04.00-000. Council District 1. The
Planning Commission granted conditional approval of the Conditional Use Site Plan on
October 21, 2013 and a one year extension on August 17, 2015; Final Plan approval is still
pending.
Representatives: Mr. Jon Falkowski, Becker Morgan Group
Mr. Holden recused himself from this application due to his employer being the engineer on record.
Mrs. Townshend stated that this is a change to a Conditional Use Site Plan for the Dover Christian
Church located on the south side of Forrest Avenue west of Dover High Drive. The Planning
Commission approved plans for the construction of a one story 9,600 SF church at this location. At
this point, they have been working through the application process. They have made some changes
to the church. It’s a smaller church and they have made some changes to the architecture. They are
also requesting an extension as the plan is set to expire in October 2016. The applicant is here and
can answer any questions.
Mr. Falkowski stated that as Mrs. Townshend mentioned, there is a significant reduction in
footprint. It went from 9,600 SF to just below 4,000 SF mainly due to budgetary concerns and
trying to get it down to a reasonable size that the congregation can raise enough money to afford.
2
Paj 3
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
There was also some stormwater limitations because they ran into some bad soils so they had to
reduce the footprint at little bit and shift the building over slightly. Parking was also reduced mainly
to match the assembly size of one hundred twenty-eight (128) seats. They have provided that
minimum parking plus 25% extra for a total of forty (40) parking spaces. No other changes to the
plan other than that and the exterior materials. They are still keeping some masonry and just adding
some siding.
Mr. Tolbert stated that it’s a much smaller building. Will they still be able to do all that they
intended to do? Responding to Mr. Tolbert, Mr. Falkowski stated yes, it still meets the program.
They will just be able to afford it a little better now.
Mr. Holt stated that it’s usually the other way around; they normally want to enlarge instead of
decrease in size. Responding to Mr. Holt, Mr. Falkowski stated that he thinks one day they would
like to expand and they have left some space on either side as money would allow. They would like
a few more meeting spaces.
Mr. Holt moved to approve C-13-11 Dover Christian Church at 1738 Forrest Avenue (Revised
Plan) for a reduction in the size of the church, seconded by Mr. Baldwin and the motion was
unanimously carried 4-0 with Mr. Holden recused and Colonel Welsh, Dr. Jones, Ms. Still and Mr.
Ambruso absent.
NEW BUSINESS
1) S-16-04 Dover Behavioral Health Systems: Phase I, 4-Bedroom Additions at 725 Horsepond
Road: Waiver Request – Review and Consideration of a Waiver Request for parking reduction
as associated with the Administrative Site Plan for construction of a 1,400 ± sq. ft. addition at
the rear of the building to consist of four bedrooms. This Administrative Site Plan review will
precede a future Site Plan Application for a 9,800 sq. ft. Phase II addition. The project is located
on the east side of Horsepond Road north of Lafferty Lane and is adjacent to the City Lane. The
property is zoned IO (Institutional and Office Zone) and is subject to the AEOZ (Airport
Environs Overlay Zone). The owner of the property is UHS of Dover LLC. Tax Parcel: ED-05-
078.00-01-08.00-000. Council District 2.
Representatives: Ms. Carol Ohm, Apex Engineering Inc
Mr. Diaz stated that this project is Phase 1 and (the total project) is an approximately 12,000 SF
addition to the Dover Behavioral Health building at 725 Horsepond Road which is just to the north
of Lafferty Lane. This first Phase is 1,400 SF which was small enough to qualify it to come into the
Planning Office for Administrative Site Plan review. The size of this addition would require them to
construct four (4) more parking spaces than what are currently available on the site. Since they say
that they are well served by existing parking they submitted a parking waiver request which cannot
be processed administratively. The data that they provided Staff shows that on any given day they
are using no more than 60% of their existing parking. They have one hundred sixty-one (161)
parking spaces on site and the very maximum number of spaces that they are using is ninety-four
(94). They also have some programs that provide shuttle service for their patients so on that basis
Staff is recommending that the Commission approve the waiver request.
3
Paj 4
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
Ms. Ohm stated that their development plans for the site right now are for a 12,000 SF addition
which they have split up into two (2) different phases. The first phase being just shy of 1,400 SF
and the second phase being close to 9,800 SF. That was done because of the urgency for four (4)
bedrooms immediately. So because of the timing for review and approval, they split the project up
into two phases. Phase 1 is before the Commission currently and Phase 2 has been submitted to the
Planning Office as well. Their request right now is for Phase 1 but the same request will also be for
Phase 2. The site also has the capacity for an area on-site which they have labeled in the last edition
that came before the Planning Commission. They showed a future parking area on-site. If in the
event in the future parking became needed, they would be an area where parking could be
constructed. They have now shown a little bit more information in terms of a parking layout for that
area, showing that they could get as many as fifty-six (56) parking spaces if needed in the future.
Typically, the parking lot is only 50% full so in order to save on stormwater management and so
forth, they would like to leave the parking as is and show the future parking area that they have
shown as needed in the event that it ever becomes necessary.
Mr. Cregar stated that in his day job he has had the opportunity to be at this facility at various times
throughout the day and there is excess parking currently on that site for morning, afternoons and
evenings. He thinks the waiver would be appropriate at this time.
Mr. Holden moved to approve S-16-04 Dover Behavioral Health Systems: Phase I, 4 Bedroom
Addition at 725 Horsepond Road: Waiver Request due to adequate parking on-site, seconded by
Mr. Baldwin and the motion was unanimously carried 5-0 with Colonel Welsh, Dr. Jones, Ms. Still
and Mr. Ambruso absent.
NEW DEVELOPMENT APPLICATIONS
1) AX-16-01 Lands of Capitol Cleaners & Launderers, Inc at 1102 South State Street – Public
Hearing and Review for Recommendation to City Council of an Annexation Request and
Rezoning Request for one parcel of land totaling 6,331 S.F. ± located at 1102 South State Street.
The property is currently zoned BG (General Business District) in Kent County. The proposed
zoning for the property is C-2A (Limited Central Commercial Zone). The property is located
west of South State Street and north of State Street Road and South DuPont Highway. The
annexation category according to Dover’s 2008 Comprehensive Plan is Category 1: High
Priority Annexation Area and the land use classification is Commercial. The owner of record is
Capitol Cleaners & Launderers, Inc. Address: 1102 South State Street. Tax Parcel: ED-00-
086.05-01-46.02-000.
Representatives: None
Mrs. Townshend stated that this is a small annexation application. It’s a property that is just over
6,000 S.F. This is actually an interesting circumstance because the property line goes through a
building and the two properties associated with the building have different owners. This is the front
portion of the building and the property is located at 1102 South State Street. The property is owned
by Capitol Cleaners & Launderers, Inc. The current zoning in Kent County is BG (General Business
District) and the proposed zoning in the City is C-2A (Limited Central Commercial Zone).
Currently, they receive City of Dover electric and water and they are looking to get into the City’s
sewer system. This is directly south of the dental office that came to the Commission about one year
4
Paj 5
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
ago and is currently under construction. Her understanding from the property owner is that they are
working with the property owner to the north to secure an easement to get the sewer to their
property. It is in a Category 1: High Priority Annexation Area with the land use classification as
Commercial. The property immediately north is zoned C-2A (Limited Central Commercial Zone)
and that is consistent with the zoning requested by this property owner. Staff would recommend in
favor of the annexation and the zoning classification noting that this is one of the enclave areas of
high priority annexation area.
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Cregar stated that do we want to attach C-2A (Limited Central Commercial Zone) at this point
in time? Responding to Mr. Cregar, Mrs. Townshend stated yes.
Mr. Cregar moved to recommend approval to City Council for AX-16-01 Lands of Capitol Cleaners
& Launderers, Inc. at 1102 South State Street. They recognize that this property is in a high priority
area and he would move that they recommend that this annexation be approved and that it be
recommended for C-2A (Limited Central Commercial Zone) upon its inclusion into the City,
seconded by Mr. Holden and the motion was unanimously carried 5-0 by roll call vote with Colonel
Welsh, Dr. Jones, Ms. Still and Mr. Ambruso absent. Mr. Holden voting yes, due to Staff comments
and its positioning in a high priority annexation area. Mr. Cregar voting yes, for the same reasons.
Mr. Holt voting yes; it is in a high priority area and he thinks it’s going to be good for City. Mr.
Baldwin voting yes, for the reasons previously stated. Mr. Tolbert voting yes; it’s consistent with
what they want to accomplish.
2) C-16-03 Duplexes at W. Reed Street and South Kirkwood Street – Public Hearing and Review
of a Conditional Use application to construct three duplex buildings for a total of six dwelling
units. The project includes a Minor Subdivision Plan to reconfigure the existing lot fronting on
Reed Street and the two lots fronting on South Kirkwood Street into six lots fronting on Reed
Street. Each of the six main lots is proposed to be between 1,673 S.F. and 2,345 S.F. in area.
The total property area is 10,871 S.F. (0.247 acres) and is zoned RG-1 (General Residence
Zone). The property is located on the east side of South Kirkwood Street just south of Reed
Street. The owner of record is Mautiste Investment Group. Property Addresses: 420 West Reed
Street, 105 South Kirkwood Street, and 107 South Kirkwood Street. Tax Parcels: ED-05-
076.12-02-65.00-000, ED-05-076.12-02-64.00-000, and ED-05-076.12-02-63.00-000. Council
District 4. This application is associated with Application V-16-01 variance requests related to
RG-1 bulk standards as approved by the Board of Adjustment on February 17, 2016.
Representatives: Mr. Michael Maupin, Mautiste Investment Group; Mr. James Burgess, Elite
Homes LLC
Mr. Cook stated that this application is for duplexes at West Reed Street and South Kirkwood
Street. This is a review of a Conditional Use application to construct three (3) duplex buildings for a
total of six (6) dwelling units. The project includes a Minor Subdivision Plan to reconfigure the
existing lots fronting on South Kirkwood Street into six (6) lots fronting on West Reed Street. There
are three (3) existing parcels that go east and west and the Minor Subdivision Plan would create six
(6) parcels that go north and south and front on Reed Street. Each of the six (6) lots is purposed to
5
Paj 6
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
be between 1,673 SF and 2,345 SF in area. Lot property is 10,781 SF and is zoned RG-1 (General
Residence Zone). The property is located on the east side of South Kirkwood Street and just south
of Reed Street. Owner of record is Mautiste Investment Group.
This was a rather complex application that they have been working with the developer on for
several months now. The property to note is within the City’s Downtown Development District so a
variety of incentives are available for construction projects that promote investment within that
District. One of the goals of the Downtown Development District program as well as other City
goals pertain to the promotion of homeownership opportunities in the Downtown area as well as
improved housing stock generally in the Downtown area. This project did receive a Large Project
Grant reserve through the Downtown Development District program.
On the next block north on Kirkwood Street, Central Delaware Habitat for Humanity has
constructed three (3) homes at this time. All three (3) of those homes are occupied by homeowners
and an additional home is under construction and there is an additional lot that they have not
received plans for yet but it’s anticipated that that additional lot will be built on as well.
The project is a Conditional Use because duplex one family dwellings are a Conditional Use
housing type in the RG-1 (General Residence Zone). The Commission may recall back in October
there were amendments to RG-1 (General Residence Zone) and RG-2 (General Residence Zone) to
allow townhouses and duplexes to be Conditional Uses in those zones.
The way the houses are sited, they have parking in the front. They basically have two (2) spaces
together which strattle the common property line between the two (2) units. There is one (1) parking
space per dwelling unit which is the requirement for duplex dwellings within the RG-1 (General
Residence Zone). The homes are sited towards the front with parking in the front. For Conditional
Uses in the RG-1 (General Residence Zone), one of the stipulations for duplex dwellings would be
that duplex dwellings shall be designed to minimize points of access to the public street and to take
access from an alley or other shared access where such access is available. An early version of this
plan did have an alley or driveway in the rear of these properties. It was a twelve (12) foot right-of-
way which would have been dedicated to the City and the houses were out close to the front. The
original plan had the parking in the back which was sort of the design intent of the RG-1 (General
Residence Zone) to sort of minimize having parking in the front of the houses. But for various
reasons among City Departments such as the Planning Office, Fire Marshal’s Office and Public
Works there was agreement that placing the parking in the front in this instance was a better
solution. It had to do with the width of Reed Street and the ability to have fire access on Reed Street
and the fact that there will not be parking on Reed Street. For a variety of reasons as well as
maintenance of the proposed driveway in the back, the plan came to the conclusion that this was the
better solution for this case.
The project did have an application through the Board of Adjustment for variances. The variances
related to lot size because the lots would be undersized for the RG-1 (General Residence Zone)
dimension standards, setbacks as well as lot coverage. Those variances were granted. Because of the
change in the layout, the project will have to go back to the Board of Adjustment as an item of Old
Business. Staff will take it back and modify the variances based on the changes in lot configuration.
The trash pick-up is going to be from Reed Street and there will be fenced screening enclosures on
6
Paj 7
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
the fronts of the houses to contain the containers. Those will be accessible right off the driveways in
the fronts of the houses.
Mr. Cook used a display to show a proposed rendering of one building with two dwelling units.
There will be three (3) of these buildings with similar overall style and form. One of the
recommended conditions of approval was to have some variation of the siding colors and minor
architectural details when possible. There is sidewalk required which would be on the Reed Street
frontage as well as the South Kirkwood Street frontage. There is existing sidewalk there but that
will have to be improved in accordance with the requirements. There also is a proposed amendment
to the Zoning Ordinance that will be going to City Council for first reading on Monday, March 28,
2016. That change relates to a provision within Article 6 Section 5.3 which is a supplementary set
of regulations related to parking in multi-family dwellings. For whatever reason that particular
provision is the only place in the Zoning Ordinance where duplexes are referred to as multi-family
dwellings. Everywhere else, duplexes are considered one-family dwellings. That change is proposed
to make the parking in the front possible and also to eliminate the inconsistency that was found.
That’s a part of the Zoning Ordinance that doesn’t get looked at very much because they don’t get
that many situations where it comes up.
A landscape and tree planting plan will be received and that is considered part of the Final Plan
approval. The recommendations suggested as conditions of approval are as follows: Staff
recommended that three (3) foot sidewalks connect the driveways to the front steps of each unit. As
mentioned, they also recommended that an enclosure be added to the front of the units to screen the
trash receptacles. They recommend that siding colors vary among the structures. They
recommended that the Landscape Plan to be submitted consider additional plantings in the yard of
the lot that’s farthest to the west that faces South Kirkwood Street. Plant materials should vary in
height be hardy and low maintenance, include a mix of evergreen and deciduous plants. They also
further recommended that driveways and sidewalks be surfaced in concrete.
Mrs. Townshend stated that she wanted to add that Staff did receive electronically the Landscape
Plan. They do have a Landscape Plan that shows the required tree planting and landscaping. It came
in on Friday afternoon.
Mr. Maupin stated that they didn’t talk a lot about the construction of the inside of the units and the
layouts. It’s going to be approximately 1,200 SF of living space with one (1) full bath and two (2)
half baths. There will be a half bath on the first floor and then a full bath and a half bath on the
second floor. They do a lot of these types of projects; this is their first one in Delaware.
Traditionally, they have done these in a modular fashion but he was happy to find a local builder
that could build these on-site stick built.
Mrs. Townshend stated that this property is the location of the old Square Club which is very old
dilapidated building. One of the things that has been appealing about this application is that it would
replace that with new housing that would be targeted toward homeownership. Mr. Maupin came to
Staff shortly after Dover received the Downtown Development District designation. He has looked
at a number properties and has worked very closely with Staff. He has pretty much done anything
that Staff has asked including initially designing the site to have alley access. Then after going
through the DAC process and seeing that the alley access created challenges with stormwater, with
the Public Works service delivery and a number of other issues, they very quickly changed the site
7
Paj 8
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
layout. This had been a very collaborative process to improve this property in this area of the City
that is in great need of investment.
Mr. Tolbert questioned if Staff had recommended that each building be a different color?
Responding to Mr. Tolbert, Mrs. Townshend stated not within the buildings. So if there are three (3)
structures with two (2) units each then each set kind of has different siding so that it’s not all one
strip of one color.
Mr. Tolbert questioned if the applicant would have a problem with that? Responding to Mr. Tolbert,
Mr. Maupin stated that there was no problem at all with that. That was already in the original plan.
They’ve done it a couple of different ways in the past; this particular design doesn’t warrant having
color change in the middle of those two duplexes but they have done it that way. In this particular
case, they are going to have three (3) separate colors of siding.
Mr. Tolbert further questioned if they knew what those colors were going to be at this point?
Responding to Mr. Tolbert, Mr. Maupin stated no, he and Mr. Burgess (the builder) are going to
talk about that. He is sure one of them will be a beige color. They tend to go with neutral colors
most of the time.
Mr. Maupin stated that the old Square Club will be demolished and one of the things they look to do
when they have to demolish a building is to try to give some development density to make the
project work for them. As Mrs. Townshend stated, they worked pretty closely with the City to try to
make a design to allow these three (3) duplexes to work on that footprint. He is very confident that
it’s really going to beautify the area.
Mr. Holt congratulated the applicant for what they have done with this property. The old Square
Club going down is a big win for Dover in a lot of ways. It’s been an eyesore for years.
Mr. Cregar stated that he is being challenged by the requested recommendation by the Planning
Commission to put these recycling and dumpster bins on the front of the house. Responding to Mr.
Cregar, Mrs. Townshend stated that trash collection was one of the issues that they had a lot of
discussion about at DAC. If they don’t have the enclosures in the front, the property owners would
have to take the units behind the houses which unfortunately their experience in the Downtown
areas and other areas throughout the City is people frequently do not do that. The concern was that
if they did not have them provide enclosures that they would end up with a constant enforcement
and complaints about trash cans being stored in the front.
Mr. Cregar questioned why the trash cans can’t go on the sides of the duplexes? Responding to Mr.
Cregar, Mrs. Townshend stated that there is only five (5) feet between the structures so the concern
was that it would fill that area pretty quickly and not give very much room to move between the
structures.
Mr. Cregar stated that he is trying to visualize how these enclosures are going to look on the front.
Responding to Mr. Cregar, Mr. Maupin noted that the buildings are going to site twenty-four (24)
feet off of the street. This will allow for the steps coming down and the sidewalk to make an “L”
into the driveway. They will have a little bit of a front yard there; it won’t be on the curb as the
existing structure is today. They have kind of what back and forth with this amongst themselves but
8
Paj 9
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
after talking to his builder and architect, they believe that they can accommodate this request. The
other issue with having a trash pick-up on the shared driveway in the rear making that a common
drive was going to present some other problems. They were going back and forth on this from a
design prospective to figure out which one looks the best. Mr. Burgess thinks this is going to look
better than the original plan that they had.
Mr. Burgess stated that as far as the trash enclosures, he is thinking that the size was specified but
it’s probably going to be like a PVC type white fence area that can be opened and closed. So when
the trash cans are taking care of they will just push both cans for each unit and close it up. The way
that they designed it the driveways to be right in the center. He envisions the enclosures to be right
in between the two center twin windows. Once you come out of the steps because they expanded
the entryway and changed it so that the parking isn’t right in front of the door and will have the
steps and the three (3) foot sidewalk that was requested going to the driveway and then right in the
center will be the enclosures. He thinks on the three (3) different buildings it will actually be a
pretty nice looking unit.
Mr. Cregar questioned if the applicant was okay with the recommendation for the driveways to be
concrete? Responding to Mr. Cregar, Mr. Maupin stated that maybe he read it wrong but he thought
the sidewalk leading to the driveway is concrete.
Mrs. Townshend stated that it states both in the report.
Mr. Maupin stated that the only issue that he might have with it is that they were discussing
pervious versus impervious type of paving and obviously with concrete they won’t be able to do
that. Asking for the driveway to be concrete, was that aesthetics? Responding to Mr. Maupin, Mrs.
Townshend stated that it was aesthetics and maintenance. They find a lot of areas where the asphalt
driveways get kind of chewed up by the grass and the weeds. Just because this is such a tight area,
the concern was that if you have one property owner who doesn’t maintain their asphalt then it
could significantly change the whole project.
Mr. Maupin stated that they see no issue with that at all.
Mr. Holt stated that he had an asphalt driveway for a long time and they finally took it out and put
in a concrete driveway. It has been such a big an improvement that he would never have another
asphalt driveway if he had a choice. He always had to patch or seal the asphalt driveway. It actually
makes the property look 100% better.
Mr. Holt questioned if this was going to be like a condo association? Responding to Mr. Holt, Mr.
Maupin stated no, these will be six (6) individual lots, all separately owned and no condo
association. With the proposal they are going to have a little bit more grass in the front so from a
lawn care perspective, a little more is going to be on the homeowner with this design instead of
having just a big open grassy area in the back yard. There will be more front maintenance required
for the homeowner.
Mr. Holt further questioned if each homeowner would be responsible for his owner property?
Responding to Mr. Holt, Mr. Maupin stated that was correct.
9
Paj 10
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
Mr. Tolbert opened a public hearing and then after seeing no one wishing to speak, he closed the
public hearing.
Mr. Holden moved to approve the Conditional Use application C-16-03 Duplexes at W. Reed Street
and South Kirkwood Street, seconded by Mr. Holt and the motion was unanimously carried 5-0 by
roll call vote. Mr. Holden voting yes; he thinks it’s a good addition for Downtown and it appears to
comply with Conditional Use and infill standards of the Zoning Ordinance and he is looking
forward to revitalization of that area. He thinks residents in that area is a good thing. Mr. Cregar
voting yes; this supports the Downtown Development District and Restoring Central Delaware and
he concurs with Mr. Holden’s reasons also. Mr. Holt voting yes; it’s a win-win for the City of Dover
and the removal of the old Square Club is a real plus. Mr. Baldwin voting yes; he is glad to see that
green building leave. Mr. Tolbert voting yes; it’s something that should have happened at that
particular site. The old Square Club building was a terrible eye sore and this will be a dramatic
change to the site and he is glad to see that.
3) US-16-01 Delaware Technical Community College Comprehensive Sign – Public Hearing and
Review of a Unified Comprehensive Signage Plan application to amend the applicant’s existing
approved Signage Plan (US-13-02) to permit additional banners totaling 418 S.F., to be placed
on multiple buildings on the Delaware Technical Community College campus. The property is
zoned IO (Institutional and Office Zone). The property is located on the west side of North
DuPont Highway between West Denney’s Road and Scarborough Road. The owner of record is
State of Delaware – Delaware Technical & Community College. Address: Delaware Tech Terry
Campus, 100 Campus Drive. Tax Parcel: ED-05-057.00-01-00.000. Council District 3. This
application is associated with US-13-02 approved by the Planning Commission on December
16, 2013 with Final Plan approval on January 14, 2015.
Representatives: Ms. Dana Sawyer, Delaware Tech; Mr. Allen Henson, Delaware Tech
Mr. Cook stated that this case is an amendment to approved Sign Plan US-13-02. This was a
Comprehensive Unified Sign Plan for their entrance signage that the Commission approved a
couple of years ago and was constructed not that long ago. This case is one of those cases where
you think something should be simple and it isn’t. The applicant approached us wanting to put up
some banners to commemorate the 50 year anniversary of the institution. As stated in the report, the
City has a Temporary Sign Permit program to allow placement of temporary signs for special
events, sales and things of that nature. The applicant wanted to be able to display these signs for the
duration of the calendar year of 2016. Unfortunately, the Temporary Sign provisions of the Zoning
Ordinance only allow for display up to ninety (90) days in a calendar year on a property.
Additionally, the Temporary Sign Permit provisions only permit two (2) signs per property up to a
total of one hundred (100) SF. There are special provisions in the Zoning Ordinance for a grand
opening but this isn’t a business so they couldn’t really go that angle. What they decided was that
the best way to accomplish this was to amend the existing Unified Comprehensive Signage Plan to
allow for the placement of the banners to commemorate the anniversary of the institution. However,
in the future the applicant can change these banners around and use the space for whatever they
want to use it for up to the size that the Planning Commission approves. So they would be able to
use that space forever without having to apply for Temporary Sign Permits for any reason. There
are three (3) different banners. In the packet there is a Site Plan and what they look like. They are
on three (3) different buildings on the campus. There were a lot of gray areas and sort of holes that
10
Paj 11
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
this fell into that unfortunately just didn’t work out favorably so that’s the reason they have to go
through this process. Normally on a campus such as this, if a sign isn’t visible it doesn’t even
require a permit. The sign that’s going to be on the building closest to Scarborough Road, because
of the angle of the wall he isn’t sure that it’s going to be visible from the public right-of-way.
It will be visible from the Campus. If you struggle to look for it from the right-of-way you might
find it. The most visible sign is going to be on Building 200 which is on North DuPont Highway.
It’s a smaller building that’s fairly close to Route 13. The other banner is going to be on a building
off of Scarborough Road and then the third banner is going to be facing West Denney’s Road. Staff
recommends approval of the plan; it represents harmonious concept incorporating colors of the
university and the college logo. The number, type and the size of the signs are appropriate to the
building size, the distances from the public roadways and the different street classifications as we
define them in the Sign Regulations of the Zoning Ordinance.
Mr. Tolbert questioned if they remove these banners with 50 year anniversary can they put anything
up there? Responding to Mr. Tolbert, Mr. Cook stated that’s the idea of putting in this plan. They
would be limited to the size that this plan approves for them. The design can change but the size
would have to stay these sizes or under and the locations approved as well.
Ms. Sawyer stated that they have nothing else to add. They are in agreement with everything stated
by Mr. Cook.
Mr. Cregar questioned if they are amending what was really their Master Sign Plan before to allow
these additional signs? Responding to Mr. Cregar, Mr. Cook stated that was correct.
Mr. Cregar stated that once they receive approval and the 50 year celebration is over, is there any
thought as to what might go there at this point in time? Responding to Mr. Cregar, Ms. Sawyer
stated that they may put up something like “Register Now, Classes Beginning” or something of that
nature.
Mr. Cook stated that he believes that the signs are up at this time. They did find a loop hole within
the Temporary Sign Ordinance to allow the signs to be placed up to the ninety (90) days. Basically,
they started on January 1 and they are on their ninety (90) day clock and when that clock runs out it
reverts to this plan assuming that it is approved.
Mr. Holt questioned if along with the signs is the school planning to have any kind of celebration or
function to celebrate 50 years? Responding to Mr. Holt, Ms. Sawyer stated yes, they have numerous
activities planned throughout the year and it’s all listed on their website.
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Holt moved to approve US-16-01 Delaware Technical Community College Comprehensive Sign
Plan, seconded by Mr. Cregar and the motion was unanimously carried 5-0 by roll call vote. Mr.
Holden voting yes; it makes sense, seems visually appealing and it seems to follow the Sign
Ordinance. Mr. Cregar voting yes; he agrees with Staff in that he thinks the size and the location
will be harmonious with the area and certainly represent the college very well. If we would have
had these as part of the original Unified Sign Plan they would have probably approved them at that
11
Paj 12
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
point in time so he thinks this is fitting. Mr. Holt voting yes; he is sure this is going to be a real plus
for the college and it helps them show off their 50 year anniversary. Mr. Baldwin voting yes, for all
of the previously stated reasons. Mr. Tolbert voting yes; he has no problem with the application.
4) US-16-02 Winner Ford Comprehensive Sign Plan – Public Hearing and Review of a Unified
Comprehensive Signage Plan (US-02-01) and permit the construction and implementation of
new signage for multiple buildings of the motor vehicle sales and service facility. The subject
property is a total of 9.94 acres ± and is zoned C-4 (Highway Commercial Zone). The property is
located on the east side of South DuPont Highway just to the north of Public Safety Boulevard.
The owner of record is 591 DuPont Highway LLC. Property Address: 592 South DuPont
Highway. Tax Parcel: ED-05-077.00-01-12.05-000. Council District 2. This application will
supersede US-02-01 approved by the Planning Commission on January 22, 2002.
Representatives: Mr. Dale McCalister, First State Signs; Mr. Joseph Lazorick, Montchanin
Development Group
Mr. Cook stated this is a review of Unified Comprehensive Signage Plan US-16-02 that would
supersede the applicant’s existing approved Signage Plan which was US-02-01 that was approved
about fifteen (15) years ago. It will permit the construction and implementation for new signage for
multiple vehicles (brands) of the motor vehicle sales and service facility. The new signage would
consist of an additional pylon sign, wall signs and post and panel directional signs. The subject
property is 9.94 acres and is zoned C-4 (Highway Commercial Zone). The property is located on the
east side of South DuPont Highway and north of Public Safety Boulevard.
The Commissioners have a Plan Book in their packets as well as a Site Plan but all the information
needed for tonight is in the Plan Book. There was a recent Site Development Plan S-14-02 for the
new Ford showroom and Final Plan approval was done in October 2014. Building Permits are
issued and construction is almost done on that project. This plan is going to replace US-02-01, a
previously approved Comprehensive Signage Plan. The reason this plan came about is because
there has been a lot building changes on that property subsequent to when the US-02-01 was
approved. He thinks the Hyundai building was new. There have also been changes in the brands that
were offered on the property. Formerly, there was Mitsubishi and Kia so that has all changed. Some
time ago a former Planner made a suggestion that at some point the whole property should be
brought back for a new plan to encompass the changes to the site. In the Plan Book submitted by the
applicant, the first ten (10) pages were provided to demonstrate how the site has changed and then
the fact that overall this Plan is a net reduction in signage in terms of the number of signs on the
site. Going through the application, Staff gave an overview of the rationale for a Unified
Comprehensive Sign Plan and what qualifies. This one qualifies because it has the street frontage on
Route 13. There is a minimum that you have to apply for a Unified Comprehensive Signage Plan
and of course as you know a Unified Comprehensive Signage Plan allows for the ability to increase
the number area or type of sign versus the standard Sign Ordinance. The Plan Book has the designs
for the different signs and the locations and then Table 2 on page 5 has a summary of the signage
area for each building by type and the dimensions of each sign.
Staff recommends approval of US-16-02 to include 1,139 SF of total signage as described in the
submitted plan. There is one pylon sign which is proposed at the corner near Public Safety
Boulevard and Route 13 and this is going to be a sign advertising their multi-brand servicing
12
Paj 13
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
meaning that they are going to service any kind of vehicle not just Ford or Hyundai. They feel that
the property has the significant frontage to allow for this and also they note that not too far from
where this sign is proposed to be, there used to be a Mitsubishi pylon sign in the past which was
subsequently removed. The use of pylon signs in the proposed scale is appropriate for the use of
property as a car dealership representing more than one brand. Also, the three (3) other pylon signs
on the site are existing so there’s no change there. In terms of the wall signage, most of the wall
signage on this plan relates to the Ford building so it will be four (4) signs on the wall facing Route
13. The Hyundai building is not changing. The wall signage that’s on the service and body shop in
the back really isn’t going to be visible from the public right-of-way but it’s included with the
Signage Plan. In terms of directional signs, there’s a new design of directional signs which is
consistent compared to the previous assortment of directional signs that used to be on the site. Staff
feels that it’s a visual improvement that will guide way-finding on the property.
Mr. McCalister stated that they agree with Staff. When they brought the plan in they were working
off the old plan. They are tearing down the old Mitsubishi building and those two (2) pylons were
already gone. They had one in the pond and another one by the building so it’s a reduction from
what they did last time and is pretty clean.
Mr. Tolbert opened a public hearing and then after seeing no one wishing to speak, closed the
public hearing.
Mr. Cregar moved to approve US-16-02 Winner Ford Comprehensive Sign Plan, stating that
having reviewed the DAC Report and having been to the site it seemed like there were a lot of signs
when looking at the plan but when you look at it in its concept and how it’s going to blend together
and pull those buildings together, he believes that it’s in the best interest to approve this Unified
Sign Plan, seconded by Mr. Baldwin and the motion was unanimously carried 5-0 by roll call vote.
Mr. Holden voting yes, due to Staff comments and other comments offered. Mr. Cregar voting yes,
based on Staff comments and actually seeing the site. Mr. Holt voting yes; he feels like it will be a
big improvement for the site. Mr. Baldwin voting yes. Mr. Tolbert voting yes; the signs are
consistent with what they are all about and there are no problems with the plan.
5) S-16-06 Grace Presbyterian Church Site Development Master Plan at 350 McKee Road – Public
Hearing and Review of a Site Development Master Plan application to permit construction in
six phases consisting of three building additions and a parking lot expansion. The building
additions would total 20,857 S.F. ±. The Plan also proposes demolition of a 1,485 S.F. ±
building near the western edge of the site. The total building area on site after completion of the
Plan would be 43,307 S.F. ±. The property is zoned IO (Institutional and Office Zone) and is
subject to the COZ-1 (Corridor Overlay Zone). The property is located on the west side of
McKee Road south of College Road. The owner of record is Grace Presbyterian Church, Inc.
Address: 350 McKee Road. Tax Parcel: ED-05-067.14-01-70.01-000. Council District 4.
Waivers Requested: Elimination of Opaque Barrier Fence Component and Partial Elimination
of Curbing. This application is associated with Application V-15-15 a variance request to
exceed the maximum number of parking spaces as approved by Board of Adjustment on
December 16, 2015.
Representatives: Mr. Raymond Harbeson Jr., Grace Presbyterian Church
13
Paj 14
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
Mr. Diaz stated that is a Site Development Master Plan. It proposes adding about 20,000 SF onto an
existing 22,000 SF church building over six (6) separate phases. The property is zoned IO
(Institutional and Office Zone) and is subject to the COZ-1 (Corridor Overlay Zone) and is located
on the west side of McKee Road south of College Road. The City and the church have worked
together a couple of times in the past on this property. In 2010 they went before the Planning
Commission and City Council to get their current zoning classification and in 2011 the Planning
Office approved administratively a Parcel Consolidation Plan that turned the four (4) parcels on
their property into one (1) parcel. The City records still show the property as four (4) parcels but
they have been moving forward with this Site Development Master Plan under the assumption that
the deed was successfully recorded at Kent County. Most recently in 2015, they went before the
Board of Adjustment to allow more parking on-site than the Zoning Ordinance allows. They need
that Variance because they plan to build most of the parking that they need on-site in an earlier
phase than the buildings that would allow that parking.
The first phase consists of most of the site work. They are expanding the parking lot and also adding
some stormwater management facilities. The second phase is a hospitality addition that is
essentially an expansion of the connection between the two (2) halves of the existing building. The
third phase is a new sanctuary that is about 10,000 SF. The fourth phase is the demolition of an
existing house that’s on the west side of the property. The fifth phase is interior renovations to the
old sanctuary that would turn it into two (2) floors so that would without extending the footprint of
the building, add about 3,200 SF. The sixth phase would be adding a new multi-purpose room that’s
about 3,500 SF. Since this is a Site Development Master Plan, what Staff will be asking the
Commission to do tonight is approve the overall Master Plan and then the individual phases would
go through Staff for individual Administrative Site Plan reviews.
There are a couple of things that Staff asked the applicant to change during the DAC meeting. Most
importantly, the Fire Marshal wants the fire lane to come up around the northwestern side of the site
so that they would be able to access the addition. The applicant has assured Staff that they can make
the changes that are being asked. There are a couple of waiver requests attached to this application.
One is a waiver request for upright curbing around portions of the edges of the parking lot and they
are requesting those to allow better stormwater flow to their stormwater management facilities. The
other request is for a waiver of the opaque barrier requirement along the southern edge of the
property. That barrier would ordinarily be required because it’s zoned residential on the other side
but it’s actually another church there and Liberty Church sent a letter concurring with the
applicant’s waiver request. It is also a forested property line so it’s partially opaque already.
The architectural drawings are particularly important because this building is in the COZ-1
(Corridor Overlay Zone) so the building side that faces McKee Road is the corridor elevation. It has
more strict requirements for architecture than the base zoning. They look for functioning windows
and architectural features on the façade but based on the drawings that the applicant gave, Staff is
satisfied that it would meet the requirements of the COZ-1 (Corridor Overlay Zone). When the
individual phases come back through to Staff, they will be reviewing the architecture in more detail.
Staff is recommending approval of the Master Site Development Plan and they would also ask the
Commission to act on the two (2) waiver requests for upright curbing and for the opaque barrier.
14
Paj 15
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
Mr. Harbeson stated that as Mr. Diaz stated, in addition to the advertisement requirements for this
public hearing they did meet with the property owners adjacent to their church and explain their
plans to them. They did get a letter from Liberty Church supporting their waiver request and just
today he was handed a letter from the Hamlet Homes Association which is the other residential
community supporting their waivers as well.
Mr. Harbeson presented a copy of the letter from the Hamlet Homes Association.
Mr. Tolbert stated that Phase 5 says it’s an interior church addition. Are they enlarging the church?
Responding to Mr. Tolbert, Mr. Diaz stated that the sanctuary is two stories tall but because it’s a
church it’s an open interior two story space so the renovation would actually add a floor inside the
building.
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Cregar questioned if the applicant agreed with all of the DAC comments and recommendations
that were brought forth by Staff? Responding to Mr. Cregar, Mr. Harbeson stated that they agree
with everything and they have worked very closely with Staff for about five (5) years on this Master
Plan and they have been very helpful.
Mr. Cregar stated that it’s very ambitious; it’s going to be a great site.
Mr. Cregar moved to approve S-16-06 Grace Presbyterian Church Site Development Master Plan
at 350 McKee Road to include the waivers for the elimination of curbing and the opaque barrier
that would be required under normal conditions, seconded by Mr. Holt and the motion was
unanimously carried 5-0 by roll call vote. Mr. Holden voting yes, due to near resident support for
the project, Staff comments, the applicant’s acceptance of Staff and DAC comments. He also thinks
that it’s a well thought out Master Plan. He appreciates all of the hard work that it takes to get to
that point. Mr. Cregar voting yes, for the reasons given by Mr. Holden and it meets the City’s
Master Plan requirements and it will be a really great site. Mr. Holt voting yes; he feels that it’s a
very nicely laid out Master Plan and it’s going to be a plus for the church. Mr. Baldwin voting yes;
it’s a very good plan that’s going to be a beautiful addition to the church. Mr. Tolbert voting yes;
due to Mr. Diaz’s thorough review and clarification on some questions that he had.
6) S-16-07 The Arbors Senior Garden Apartments at 1051 College Road – Public Hearing and
Review of a Site Plan application to permit construction of a 48-unit senior garden apartment
complex. The project consists of a proposed three-story 55,350 S.F. residential building and
associated site improvements, including construction of an improved public street (Senior Way)
on existing right-of-way connecting College Road and Topaz Circle. The parcel is divided into
two discontinuous areas on either side of the right-of-way and totals 3.77 acres. It is zoned RG-2
(General Residence Zone). The property is located on the north side of College Road and west
of McKee Road. The owner of record is Shree Ganesh LLC. Address: 1051 College Road. Tax
Parcel: ED-05-067.00-01-35.03-000. Council District 1. Waivers to be Requested: Partial
Elimination of Curbing. Project includes review of an Active Recreation Plan. A previous
Conditional Use Site Plan C-10-02 The Arbors Condominiums was reviewed by Planning
Commission in August 2010 but has since expired.
15
Paj 16
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
Representatives: Mr. Alex Schmidt, Century Engineering Inc; Mr. Douglas Barry, T&M
Associates
Mrs. Townshend stated that this property is known as The Arbors Senior Garden Apartments. It’s
located on College Road just west of McKee Road. This project has been before the Planning
Commission on three (3) other occasions. First back in 2005 as College Road Garden Apartments, it
was a Planned Neighborhood Design Senior Citizen Housing Option. After it expired, it came back
again as The Arbors Planned Neighborhood Design Senior Citizen Housing Option. At that point in
time the road right-of-way for Senior Way was platted as part of that plan so the road right-of-way
for Senior Way was recorded in 2009 but then the Site Plan expired and The Arbors Condominiums
came back to the Planning Commission in 2010. That plan has also since expired. The proposed
plan has forty-eight (48) dwelling units on 3.77 acres.
There is a revised plan sheet that is on the Commissioner’s desks that shows some of the changes to
the plan. Most notably is the removal of ten (10) parking spaces. There were ten (10) parking spaces
that were within or partially within the front yard of the property as it relates to Senior Way. There
is a written request for a reduction of ten (10) spaces to bring the parking down to ninety-eight (98)
spaces instead of one hundred eight (108) spaces. As a part of that, they will need to on their Final
Plan, show where that parking would be accommodated in the future if they were to need it. Part of
that justification for the parking reduction is that these will be senior apartments. This is not
however coming to the Commission as a Senior PND. The other waiver request that is requested by
the applicant is the partial elimination of curbing and that again is to facilitate stormwater. There is
an Active Recreation Plan because of the size and the density being proposed. There is a minimum
Active Recreation Area of 150 SF per dwelling unit required or a minimum per project of 10,000
SF. Therefore, 10,000 SF is required. The Commission does have the Active Recreation Plan on the
sheet in front of them. The report indicates that there is about 21,000 SF of active recreation based
on the calculation of 150 SF per dwelling unit or 10,000 SF total; 10,000 SF is what is required.
What they did is changed the calculation to incorporate the path but not a lot of the lawn area
around the path. The Active Recreation Area proposal submitted includes a walking path on the
west side of Senior Way along with a gazebo in that area. That was reviewed by the Parks,
Recreation and Community Enhancement Committee last week at their meeting on the March 15,
2016.
Renderings of the building are consistent with what was approved before. The building is three (3)
stories and the height is listed as 38 feet and 6 inches to the mean height between the eave and the
ridge which is how they determine height for things with this type of roof. They do have bicycle
parking proposed; they have a bicycle rack proposed near the front entrance sidewalk. They will
need to install sidewalks along the public street frontages including Senior Way. They have
provided the emergency rear access that is required for apartments. The other DAC agencies have
reviewed this and offered their comments as well. The stormwater management plan is still active
from its prior approval so at this point they would be working through the City’s process and
DelDOT’s approval for the final approvals.
Mr. Tolbert questioned if the pathway was a walking pathway? Responding to Mr. Tolbert, Mrs.
Townshend stated yes, it’s a five (5) foot wide walking path.
16
Paj 17
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
Mr. Tolbert questioned how long the pathway would be? Responding to Mr. Tolbert, Mr. Barry
stated two hundred (200) yards; it circulates through the site so it’s continuous path.
Mr. Holt stated that it looks like the walking path will be concrete. Responding to Mr. Holt, Mrs.
Townshend stated yes.
Mr. Barry stated that he just wanted to reiterate since this project has been approved twice but
expired because it was never constructed. The first time it was approved it was senior only, the
second time it was approved it was non-senior. This time it is definitely going to be deed restricted
to seniors.
Mr. Tolbert opened a public hearing.
Mr. Thomas DiSabatino – 346 Topaz Circle Dover, DE 19901
Mr. DiSabatino stated that he is a five (5) year resident in Emerald Pointe which is property
adjacent to this project. He is here basically to voice concerns of some of the neighbors considering
the concern about joining Topaz Circle with Senior Way and the traffic situation that would result
from it. The intersection at McKee Road and College Road is a high traffic area. A lot of traffic
goes through there during the daytime, he guesses to get to Kraft and the Edgewell factories. It’s
pretty much very busy for twelve (12) hours a day. Emerald Pointe only has one entrance into it at
the moment and that entrance is on McKee Road and for approximately twelve (12) hours a day it’s
very difficult to make a left turn out of there to head in the direction of Del-Tech. A right turn from
that entrance is not so bad. He thinks there has been one fatality at that location since he has been
living in the development for the past five (5) years. The residents are concerned since that is such a
high traffic area that people making a left turn at College Road and McKee Road might start to use
Senior Way and Topaz Circle to avoid the long wait to make a left hand turn during rush hour. He
thinks the signal at this location is about thirty (30) seconds long which allows about five to six (5-
6) cars through to make that left turn. They are also concerned that they may be missing that
intersection completely by coming off of McKee Road into Emerald Pointe and exiting Senior Way
onto College Road. Frankly, he doesn’t see the benefit of all that extra traffic through the
neighborhood to the residents of this proposed complex and their residents. It seems to him that
over time it’s going to become a cut-through to try voiding that intersection at College Road and
McKee Road.
Mr. Dan Maler – 16 Inverness Court Dover, DE 19904
Mr. Maler stated that his concerns are basically the same as Mr. DiSabatino but from the College
Road viewpoint. Coming out of Fox Hall right now making a left hand turn is very difficult. He has
measured it since he has heard about this meeting from the entrance of the Woodlands of Fox Hall
to the exit of the shopping center on the east side of the corner is approximately 2/10 of a mile. You
already have three intersections in this area, the Woodlands, Hidden Oaks and the Shopping Center
and on the opposite of the road you have two (2) churches and the business center on McKee Road.
The traffic is just ridiculous now and to add another street he thinks it’s just an accident waiting to
happen unless there is going to be improvements to that intersection and that road. If you go out
there in the mornings and the evenings, the traffic is backed up halfway to Hidden Oaks because of
that light. He doesn’t have any problem with the Senior Apartments, he just has a major problem
with the extension of the road out to State College Road. He doesn’t think they need another
17
Paj 18
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
intersection there at this point in time. Responding to Mr. Maler, Mrs. Townshend stated that
DelDOT reviews the entrances.
Mr. Maler questioned if DelDOT had approved the entrance or if they were still reviewing it?
Responding to Mr. Maler, Mrs. Townshend stated that they are in the process. It had been approved
in the past. DelDOT says that it was received for formal review in February and that they would be
issuing comments and then the applicant would address them. We do not have the detailed
comments from DelDOT at this time.
Mr. Maler stated that the road has not been approved at this point. Responding to Mr. Maler, Mrs.
Townshend stated that Senior Way has been recorded; that was recorded back in 2009 after the plan
went to the Planning Commission in 2007.
Mr. Maler stated that he understands that but they are now talking about seven (7) years later and
the traffic conditions were very much different from when it was originally approved. So he is
wondering where they stand now. Responding to Mr. Maler, Mrs. Townshend stated that DelDOT
will be doing a full review of the entrance at College Road with the traffic generation that would be
expected from both this and any traffic associated with Emerald Pointe.
Mr. Maler stated that he is anticipating at least sixty (60) vehicles if there are forty-eight (48) units
even if it’s senior center because more people have two (2) cars today. If you add the traffic from
Emerald Pointe, you would be talking about one hundred (100) cars a day.
Mr. Tolbert questioned if Mr. Maler had talked to DelDOT about his concerns? Responding to Mr.
Tolbert, Mr. Maler stated no because he just recently found out about this project. He has concern
about the traffic; he thinks there are too many outlets on State College Road in 2/10 of a mile.
Mr. Tolbert stated that DelDOT was aware of this situation. Responding to Mr. Tolbert, Mr. Maler
asked if there was a contact person at DelDOT for him to contact?
Mrs. Townshend stated that the entrance permit is only granted after the DelDOT Planning Section
has coordinated the development review with all of the sections in DelDOT. So at this point what
they are looking at is the entrance and whether there would need to be any modifications to College
Road in the area of the entrance which could be things like deceleration lanes, acceleration lanes or
turn lanes.
Mr. Maler stated that was his question, if there were any plans to approve that would maybe change
his perspective but a two (2) lane road now with that intersection is not going to work. The right
turn lane onto State College Road is ridiculously short and that’s one of the reasons why traffic
backs up at the light. Responding to Mr. Maler, Mrs. Townshend stated that Mr. Barry has met with
DelDOT so he might have some of the preliminary information.
Mr. Barry stated that they have had several meetings with DelDOT. They have done a detailed
traffic analysis and while it’s in the infancy of the review process they do know that there is going
to be right turn lane requirements, bike lane requirements, deceleration lane requirements but they
won’t know what the final permits will be until it’s gone through the cycle of DelDOT’s review and
approval process.
18
Paj 19
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
Mr. Tolbert questioned if the applicant would be in contact with the residents in the area regarding
this matter after getting a resolution from DelDOT? Responding to Mr. Tolbert, Mr. Barry stated
that he can.
Mr. Tolbert stated that Mr. Maler may want to be in contact with the residents afterwards because
there is a traffic concern there and it’s going to continue to be a problem in that area. That is not
something that the Planning Commission can resolve. They can disapprove the application but they
have to have a reason to do that. But he suggests that the problem be taken to DelDOT because they
have the say so over that traffic situation. The applicant is already in contact with DelDOT but he
should be in contact with DelDOT also so that he is aware of DelDOT’s plan.
Mr. Holden stated that the challenge of entrances and traffic onto the road is one that we certainly
deal with. Any property owner because they weren’t there first still also has a similar right to access
to the road and so it’s a challenge that we face as any area grows. The intersection of McKee Road
and College Road is known be of issue and that’s a point for any citizen to push with DelDOT to
address that. They also have to be cognizant of that because this project comes after others doesn’t
mean that they have a diminished right to State College Road to get to and from their project. They
have to build to certain standards; the Site Plan shows bike lanes, deceleration lane, easement for
other improvements so they are held to a standard that past developments were not. So they do carry
some greater burden but it is also a challenge that we deal with. Is the connection to Topaz Circle is
under DelDOT’s specific direction or is that City purvue? Is there something that pushes for the
connection? Is that a connection that the project desires or one that’s required? Responding to Mr.
Holden, Mrs. Townshend stated that the connection at Topaz Circle is under the City’s review. She
doesn’t believe that it’s under the Planning Commission at this point in time. The right-of-way is
platted; it exists. When Emerald Pointe was designed it has a sub-street that connects to this
property in anticipation of development of this property. The Subdivision Ordinance requires that
when you have a development that exceeds twenty (20) lots that you have to have two (2)
connections to a public road. This is that second connection to a public road for Emerald Pointe.
She thinks that if this were to be modified, eliminated or blocked, they would have to determine
what process that would be but she thinks that would go through a process where there would need
to be a request to waive the request of the requirements of the Subdivision Ordinance and to
expunge the right-of-way. This is a separate process that she believes would come through here but
ultimately ends up at City Council.
Mr. Holden stated that he understands the concerns of the thru traffic. He doesn’t know that he
would think driving through the residential development would be a short cut because of the
challenges of getting back onto McKee Road. If traffic is backed up at the intersection, traffic on
McKee Road is going to be very busy too so he would hope that it wouldn’t be seen as a shortcut.
He doesn’t know that he would see it as a shortcut; he would think heading to the stop light to take
the right would be the faster route there as well. It’s always a concern as you interconnect roads but
it’s also the intent of what the right-of-way that’s been platted. There’s some history for the intent
for that to occur when these different properties build out and so he doesn’t know that the Planning
Commission has too much to say there. Talking to your City Council person might be a route or
talking to DelDOT might be a route to overcome it and amend that connection as its planned right
now is a relatively high hurdle. There are some pieces to get through but it is certainly something to
push as a resident position.
19
Paj 20
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
Mr. Maler stated that he understands that if there is an open lot that something is eventually going to
be there. His concern about improvements to State College Road cannot be answered by anyone
tonight and the inclusion of Emerald Pointe brings additional traffic other than the complex that’s
going in. You aren’t just talking about forty-eight (48) units worth of cars or traffic coming in and
out; you are talking about a whole other neighborhood which is apparently in excess of twenty (20)
residential lots. You are bringing additional traffic other than what’s being built there. Responding
to Mr. Maler, Mr. Holden stated that is specifically under DelDOT’s purvue and that is going
through the entrance plan process. DelDOT takes a look at the potential traffic. They take a look at
whether you have to do a Traffic Operational Analysis or a Traffic Impact Study, whether off-site
improvements are warranted and so DelDOT carries the ball there with looking at that issue.
Mr. Maler stated that he has a contact at DelDOT that he can talk to but he thought that Mrs.
Townshend just stated that the connection between Emerald Pointe and Senior Way is the City’s
purvue not DelDOT’s. Responding to Mr. Maler, Mr. Holden stated that as he understands it, it’s
driven by the Subdivision Ordinance. It’s platted right-of-way has been made plain that that was the
intent when Emerald Pointe was approved but also when this project had a prior approval that did
end up being recorded. DelDOT is going to have that knowledge and they are going to have that
knowledge of the potential traffic in the residential area and from this. But if his concerns are truly
valid DelDOT is the one who looks at those concerns then he needs to speak with them regarding it.
Mr. Maler stated that if this project wasn’t being built would Senior Way be coming through now
even though Emerald Pointe is over by twenty (20) units or would it still be blocked up like it is
now? Responding to Mr. Maler, Mrs. Townshend stated that the City would not construct Senior
Way.
Mr. Maler stated that Senior Way is being driven by this project. Responding to Mr. Maler, Mrs.
Townshend stated yes.
Mr. Cregar stated that the access onto College Road provides the second access to what would be
Emerald Pointe also. Responding to Mr. Cregar, Mrs. Townshend stated yes.
Mr. Cregar stated for public safety, that was always considered to be part of what would be needed.
Responding to Mr. Cregar, Mrs. Townshend stated yes. To give a comparison, the reason for the
requirement for multiple points of access exist is because of what they ended up with along Route 8
and the situation where you have many developments that can only get in and out one way. It is not
efficient for traffic for traffic circulation but also if there’s an issue, you only have one way in for
public safety.
Mr. Richard McKee – 1021 West State College Road, Dover DE 19904
Mr. McKee stated his property abuts the planned property to the west side. He noticed on the
agenda that the owner is listed as Shree Ganesh LLC. Is it anticipated that this be the owner of the
property at the time of construction of this project? He noticed that there has been out there for quite
some time a real estate sign for R&R Real Estate. He presumed the property was for sale.
Responding to Mr. McKee, Mrs. Townshend stated that the City doesn’t have a role in ownership
transfer.
20
Paj 21
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
Mr. McKee stated that the traffic concerns are very real; he sees them from his living room window
every day. As for connecting Topaz Circle and Senior Way, he has a suggestion that entry and exit
from Senior Way onto College Road probably should be right turns only under current conditions
and as for in and out of Topaz Circle he suggests that it be gated and accessed only by emergency
vehicles. You have the fire station right down the road and it would certainly be a blessing to them
to be able to have that and having limited access to emergency vehicles only would eliminate the
cut through issue that is being brought up this evening.
Mr. Tolbert stated that everyone who spoke during the public hearing tonight should get together
after the meeting.
Mr. Tolbert closed the public hearing.
Mr. Holden moved to approve S-16-07 The Arbors Senior Garden Apartments at 1051 College
Road including the two (2) waiver requests for upright curbing and required parking and inclusion
of all Staff comments, second by Mr. Holt.
Mr. Cregar questioned if the recreation part of this is also part of what they need to approve?
Responding to Mr. Cregar, Mrs. Townshend stated yes.
Mr. Holden moved to approve S-16-07 The Arbors Senior Garden Apartments at 1051 College
Road including the two (2) waiver requests for upright curbing and required parking and inclusion
of all Staff comments and the Active Recreation Plan, second by Mr. Holt and the motion was
unanimously carried 5-0 by roll call vote. Mr. Holden voting yes, for the reasons stated and Staff
comments. Mr. Cregar voting yes; the concerns mentioned tonight are legitimate and we need to
rely on the State to look at this entrance as part of their overall review and whatever
recommendations they make the Commission would have to adhere to. Mr. Holt voting yes, with the
hope that they can get the traffic problem worked out for this roadway. Mr. Baldwin voting yes, for
the reasons previously stated. Mr. Tolbert voting yes; he is fully aware of the concerns that have
been expressed but the applicant will work closely with the Staff and DelDOT.
7) MI-16-02 Text Amendment: Keeping of Domestic Animals and Keeping of Chickens –
Public Hearing and Review for Recommendation to City Council on a series of Text
Amendments to Zoning Ordinance, Article 3 – District Regulations, Section 1.15d. The
proposed Ordinance revisions would amend the accessory uses of the One Family Residence
Zone regarding the provisions of keeping of domestic animals and add Article 3, Section
1.15e pertaining to the keeping of chickens and the associated restrictions. Staff Substitute
#1 for Ordinance #2016-01. The Public Hearing and Final Reading before City Council on
April 11, 2016.
Representatives: None
Mrs. Townshend stated that this was a proposed amendment to the Article 3 District Regulations,
Section 1 One Family Residence Zones, specifically relating to accessory uses within the one family
residence zones. Many of the other residential zones also refer back to the one family residence
zones so this applies beyond simply the one family residence zones. What this would do is change
some language. It would make it clear that keeping of domestic animals as pets would be permitted
21
Paj 22
CITY OF DOVER PLANNING COMMISSION MARCH 21, 2016
and takes out the references to allowing up to twenty-five (25) foul but then creates a new
subsection that would allow keeping of chickens for individual domestic purposes subject to a
number of restrictions. When this went before City Council for first reading a question came up as
to whether or not this would prevent the keeping of roosters. They thought that had been addressed
in the animal control section of the Code but upon review of that section they determined that
roosters are not prohibited anywhere in the Code. Therefore, Staff is recommending that a line be
added between lines 38 and 39 that would prohibit the keeping of roosters. In terms of the
restrictions that they would have on keeping of chickens, you would have to have a quarter acre lot.
You could not have more than five (5) chickens on a residential lot and they would need to be
registered with the Delaware Department of Agriculture. The purpose of this registration is so if
there is some type of avian virus they can notify the owners of chickens. They would require that
chickens be penned in a coop that would be at least four (4) square feet per chicken and be located
in a rear yard with a minimum of twenty (20) feet from the side and rear yard property lines and that
any odor associated with the chickens would not be discernable from the property lines. By June 1st,
the properties would have to be in compliance. Properties that are not large enough to have chickens
or that have more than five (5) chickens or that are not penned in the proper way would need to be
in full compliance by June 1st.
Mr. Holden stated that he is going to abstain from the discussion and voting because he has a bias
since he has chickens of his own.
Mr. Cregar stated that he assumes this came about through City Council because there is a problem.
Responding to Mr. Cregar, Mrs. Townshend stated that there is an area in the City where there are
chickens on a residential lot that the odor is discernable from beyond the property lines and
neighbors are concerned.
Mr. Baldwin questioned how many chickens this person has? Responding to Mr. Baldwin, Mrs.
Townsend stated that she thinks it was six (6).
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Holt questioned if roosters were more of a problem? Responding to Mr. Holt, Mrs. Townshend
stated that they are noisy.
Mr. Cregar moved to recommend approval to City Council for MI-16-02 Text Amendment: Keeping
of Domestic Animals and Keeping of Chickens, seconded by Ms. Holt and the motion was
unanimously carried 4-0 by roll call vote with Mr. Holden abstaining and Colonel Welsh, Dr.
Jones, Ms. Still and Mr. Ambruso absent. Mr. Cregar voting yes. Mr. Holt voting yes. Mr. Baldwin
voting yes. Mr. Tolbert voting yes.
Meeting adjourned at 9:01 PM.
Sincerely,
Kristen Mullaney
Secretary
22