Ale nan kontni prensipal la
AskDover

Entèlijans atifisyèl (AI) tradui paj sa a. Pèsonn pa revize li, e li ka gen erè. Gade vèsyon angle a

Dokiman ki tache

Historic District Commission. 18 fevriye 2016.

Louvri PDF la

Yo rale tèks sa a nan PDF la otomatikman, epi li ka gen erè. PDF la se dosye ofisyèl la, kidonk tcheke l anvan ou konte sou sa a.

7 paj pa gen anpil tèks ou ka li isit la, oswa yo pa gen ditou, souvan paske se eskanè oswa desen. Gade PDF la pou sa yo.

Paj 1

CITY OF DOVER HISTORIC DISTRICT COMMISSION AGENDA THURSDAY, February 18, 2016 - 3:00 P.M. City Hall – Conference Room ROLL CALL APPROVAL OF AGENDA APPROVAL OF MINUTES OF MEETING on January 21, 2016 COMMUNICATIONS & REPORTS 1. Summary of 2016 Activity a. Summary of Applications 2015 b. Summary of Architectural Review Certifications for 2016 2. Department of Planning & Inspections Update NEW APPLICATIONS OLD BUSINESS 1. Certified Local Government (CLG) Program a. Status of Annual Report (May-September 2015) NEW BUSINESS 1. Review of Permits Referred to Commission 2. Presentation on Capitol Complex Lighting Upgrades (HI-16-01) ADJOURN THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSION. Agenda Posted: February 10, 2016

Paj 2

CITY OF DOVER HISTORIC DISTRICT COMMISSION January 21, 2016 The Regular Meeting of the City of Dover Historic District Commission was held on Thursday, January 21, 2016 at 3:07 PM with Chairman Salkin presiding. Members present were Chairman Salkin, Mr. Scrafford and Mr. McDaniel. Mr. Jackson and Ms. Horsey were absent. Planning Office Staff members present were Mrs. Melson-Williams, Mr. Cook, Mr. Diaz, and Mrs. Purnell. APPROVAL OF AGENDA Mr. McDaniel moved for approval of the agenda, seconded by Mr. Scrafford and the motion was unanimously carried 3-0. Mr. Jackson and Ms. Horsey were absent. ADOPTION OF MINUTES OF THE REGULAR HISTORIC DISTRICT COMMISSION MEETING OF DECEMBER 17, 2015 Mr. McDaniel moved to adopt the minutes of the regular Historic District Commission meeting of December 17, 2015, seconded by Mr. Scrafford and the motion was unanimously carried 3-0 of the members present. COMMUNICATIONS & REPORTS Summary of 2014-2015 Activity Mrs. Melson-Williams stated that there were six (6) numbered applications for 2014 and eight (8) for 2015. Some of which were informational or referrals that came before the Historic District Commission. There were no major changes to the Summary of Applications other than what was previously noted the building at 312 W. Loockerman Street which was the consideration of a determination of Demolition by Neglect has now been demolished by the City. Mrs. Melson-Williams stated the Santa House arrived just in time before Christmas so that it could be occupied by Santa. Responding to Chairman Salkin’s question regarding the status of South State Street and Elm Terrace, Mrs. Melson-Williams stated that it went through a Historic District Commission review process and then a Site Plan process with the Planning Commission. The plans were finalized. They are still within their plan approval timeframe from Planning Commission. It may expire later this year. From the Planning Commission approval, they have two (2) years to finalize the plan and start construction and they can ask for an additional one (1) year extension. She thinks that they have already asked for the one (1) year extension so it would expire in 2016. This was pertaining to the parking lot at the rear of the building. The building is divided as apartments. Summary of Architectural Review Certifications for 2015 Mrs. Melson-Williams stated that there was a flat roof permit (in December). The permit activity within the Historic District had fifty-eight (58) permits. There were sixteen (16) interior or non-visible renovation projects which require no Architectural Review Certification. There were

Paj 3

CITY OF DOVER HISTORIC DISTRICT COMMISSION JANUARY 21, 2016 42 permits that required some type of Architectural Review Certifications. Responding to Mr. Scrafford’s question regarding if there was a continuation of trees on their plans at the Brockstedt Law Office on State and Loockerman Street facing Division Street or is it complete, Mrs. Melson-Williams stated that she thinks it is complete relating to landscaping. There was a tree planting requirement because portion of the project had to go before the Planning Commission. The discussion of the trees facing Division Street was for the shrub plantings at the end of the parking lot fencing area. Mr. Scrafford stated that it looked good but he thought that there was more. Report of 2015 Historic District Commission Activity Mrs. Melson-Williams stated that they were reporting on the designation as a Certified Local Government. The report will become part of the overall Department of Planning and Inspections annual report. Responding to Mr. McDaniel’s question whether verification had to be sent to the State so that they know the Historic District Commission is abiding by the rules of the Certified Local Government, Mrs. Melson-Williams stated that she will discuss it later in the meeting. NEW BUSINESS Review of Permits Referred to Commission There were none. Information on Permits with Architectural Review Certification to be issued by Staff: Mrs. Melson-Williams stated included in the packet was information and photos on Building Permit #16-25: Brick Repair & Repointing Project at the Century Club Building at 40 The Green. The contractor will be Paul’s Pointing. The project will consist of the entire front brick façade of the building. There are some minor brick repairs where the brick condition has deteriorated. The permit was filed with the anticipation of an early spring start on the project. The project follows the Design Standards and Guidelines for the City of Dover Historic District zone in their approach to taking care of the historic brick. Staff intends to issue the Architectural Review Certification. Mr. McDaniel is a nearby neighbor of the facility. Certified Local Government (CLG) Program: Mrs. Melson-Williams stated that there is a start of an Annual Report that is required as a Certified Local Government. The report will cover the City of Dover’s participation as a Certified Local Government during the timeframe of May 15, 2015 through September 30, 2015. She has begun the Annual Historic Preservation Report based on the guidance in the Certified Local Government handbook. Earlier this week she received some correspondence from the State Historic Preservation Staff member (Laurie) who manages the Certified Local Government program. The requested information is due by February 15, 2016. The final version will be provided to the Historic District Commission members once it is completed. 2

Paj 4

CITY OF DOVER HISTORIC DISTRICT COMMISSION JANUARY 21, 2016 Responding to Chairman Salkin’s question whether the requested information had to be submitted to the State and Federal, Mrs. Melson-Williams stated that it is a State requirement and then the State gathers information collectively, to then do an overall roll up for federal submission. She also received a question series from the National Park Service and it will also ultimately get rolled up by the State Office. Responding to Mr. McDaniel’s question regarding how many communities is part of the Certified Local Government, Mrs. Melson-Williams stated that they are number 6. Grant Opportunities Mrs. Melson-Williams stated that information was provided in the packet. The first is the National Creative Placemaking Fund, which funds projects that work with artists and arts organizations in the historic district area. The second is the American Architectural Foundation for their Sustainable Cities Design Academy, which provides development and design assistance to local government, business, and community leaders and developers engaged in planning and implementing civic projects that support and expand the sustainability goals of the city and region in which they are located. Mr. Scrafford questioned whether the Dover Transit Center Neighborhood Plan project Mr. Gregg Moore presented to the Historic District Commission was a qualifying project. Mr. McDaniel stated that when the Dover Transit Center Neighborhood Plan first started they were going to try to locate an office building in the location. Mrs. Melson-Williams stated that the Neighborhood Plan has a number of different implementation strategies and projects. Mr. Scrafford and Mr. McDaniel suggested informing Mr. Moore of the grant opportunities. Mrs. Melson-Williams stated that the grant sounded like for a project that needs additional technical assistance in working through the details. Responding to Mr. McDaniel’s question whether the Historic District Commission qualified for the grants because they are a Certified Local Government, Mrs. Melson-Williams stated that the Historic District Commission potentially qualified and they reached out specifically to those types of entities. OLD BUSINESS South Bradford Street Streetscape Enhancements Project: Segment between West Division Street and West Loockerman Street (HI-15-08): Public Workshop held January 12, 2016. Mrs. Melson-Williams stated that the Public Workshop was an open house format. They presented the overall maps that were presented to the Historic District Commission. There was an opportunity to provide written comments. Planning Staff will forward the minutes of the last meeting to the project team of the presentation made at the Historic District Commission meeting so that it will reflect the questions and views on the project. 3

Paj 5

CITY OF DOVER HISTORIC DISTRICT COMMISSION JANUARY 21, 2016 Responding to Mr. McDaniel’s question whether from the open forum if Mrs. Melson-Williams got a feel of what the other people would like regarding the project, Mrs. Melson-Williams stated that there were a number of people who expressed interest in the full brick concept. There were less than 20 people in attendance and some of them included residents along the street. Mr. McDaniel commented that it seemed like a long time before they choose what they are going to do and an even longer time before they implement the project. Mrs. Melson-Williams stated that this is the concept stage and then they move into what are the alternatives, selection of proposals, design details, and bidding then construction of the project. Responding to Mr. McDaniel’s question whether the timeframe would be 2017, Mrs. Melson-Williams stated that she believed that it was the timeframe. She will keep the Historic District Commission updated as things progress. Mr. Scrafford stated that the project was advancement in the City’s historic presentation. In the historic area sometimes the residents are driven by dollars and that is not what the program is about. There are successful brick sidewalks in the City. Discussion of Architectural Review Certifications process Mrs. Melson-Williams stated that there was nothing new to report. Mr. Scrafford stated that the process works well, but they just need to make sure they are comfortable with how it works because sometimes they get a little confused. It seems to be moving in the direction the Historic District Commission wants the process to go. Chairman Salkin stated that the process itself other than the decision about what gets into the process seems to be working fine. Responding to Mr. McDaniel’s question if there were any applications, Mrs. Melson-Williams stated not at this point. There may be something in the future due to the vacant lots in the Downtown Historic District area if something was to move forward. The meeting was adjourned by acclamation. Meeting adjourned at 3:34 PM Sincerely, Maretta Savage-Purnell Secretary 4

Paj 6

City of Dover Historic District Commission Summary of Applications 2015 Updated thru February 1, 2016 FILE# PLAN NAME LOCATION TYPE ACTION STATUS HI-15-01 DRAFT Certified City of Dover Application to be Draft Application presented to HDC on Planning Staff completed DRAFT of CLG Local designated as a 1/15/2015. Draft Application reviewed by Application. Application presented to City Government Certified Local Legislative, Finance & Administration Council who endorsed its submission. Application Government Committee on 2/9/2015. City Council on Submission to SHPO with cover letter 2/23/2015 approved Application for dated 3/30/2015 from Mayor. Designated submission. a CLG on May 15, 2015. HI-15-02 Sign Permit #14- 151 Kings Highway Sign Permit for post Permit #14-1609 referred to HDC by City Permit issued for post and panel sign. Sign 1609 Referral SW, Woodburn and panel sign Planner for Architectural Review installed. Governors Mansion Certification consultation; 1/15/2015 HDC Meeting - approved ARC as submitted in permit; Staff Approval of Permit per ARC HI-15-03 Sign Permit #15- 6 South State Street, Sign Permit for Permit #15-15 referred to HDC by City Permit issued. Freestanding sign and fence 15 Referral Baird Mandalas & freestanding sign Planner for Architectural Review installed at property corner of South State Brockstedt and fence Certification consultation; 1/15/2015 HDC Street and Division Street. Meeting - approved ARC with conditions on height and size; Staff Approval of Permit per ARC HI-15-04 Building Permit 3 Loockerman Plaza, Building Permit for Permit #15-19 referred to HDC by City Permit issued. Construction complete. #15-19 Referral PNC Bank Drive-thru ATM Planner for Architectural Review structure Certification consultation; 1/15/2015 HDC Meeting - approved ARC with conditions for dumpster enclosure; Staff Approval of Permit per ARC HI-15-05 Biggs Museum 406 Federal Street Installation of Architectural Review Certification Permit issued. Installation of the sculpture Sculpture exterior sculpture of Application granted at HDC meeting of is complete. tree and birds 2/19/2015; Staff Approval of Permit per ARC

Paj 7

City of Dover Historic District Commission Summary of Applications 2015 Updated thru February 1, 2016 HI-15-06 Building at 312 312 West Determination of Determination of Demolition by Neglect by Active Code Enforcement Cases and West Loockerman Street Demolition by HCD at meeting of 2/19/2015. Property designated a Dangerous Building. Property Loockerman Neglect declared a Dangerous Building by City owner has until 9/9/2015 to repair or Street Council on 3/9/2015. demolish building. City taking action to demolish the building. Demolition Permit #15-1387 issued 10/9/2015. Demolition of building complete. HI-15-07 Santa House Loockerman Way Informational Permit issued. Structure placed Project and other locations Presentation Project for a portable temporary structure. 12/17/2015. Presentation on project at 4/23/2015 HDC Meeting. Staff Approval of Permit #15- 1159 per ARC recommendations. HI-15-08 South Bradford Bradford Street Informational Project concept for proposed pedestrian Presentation of project Street segment between Presentation improvements including new sidewalks, concepts/alternatives. Public Workshop Streetscape West Division Street curb ramps, crosswalks, curbing, held by DelDOT 1/12/2016. Enhancements and West pedestrian lighting, landscaping. Project Loockerman Street Presentation on project concept at 12/17/2015 HDC Meeting.

Paj 8

Summary of Permit Applications with Architectural Review Certification 2016 - Updated Thru 1-31-2016 DATE PERMIT # LOCATION TYPE ACTION ON ARCHITECTURAL NOTES REVIEW CERTIFICATE 1/12/2016 16-35 47 South West Street Roof Permit Staff Approval. No ArchRevCert Replacement of flat roof system. required due to lack of visibility.

Paj 9

Presentation on Capitol Complex Lighting Upgrades HI-16-01 A presentation will be made at the meeting on a lighting upgrade project in the Capitol Complex area. See the attached:  Photographs  Lighting Specifications  Lighting Location Plans

Paj 14

ABBREVIATIONS INDEX DRAWING LIST General 1.0 PROJECT COVER SHEET Electrical 9.0 ELECTRICAL COVER SHEET ŏ 9.1 SITE LIGHTING PLAN - AREA A 9.2 SITE LIGHTING PLAN - AREA B 9.3 SITE LIGHTING PLAN - AREA C This drawing is the property of 9.4 TOWNSEND BUILDING - BASEMENT ELECTRICAL PLANS - ADD ALTERNATE #1 StudioJAED and is prepared for the exclusive use of its clients 9.5 LEGISLATIVE HALL - BASEMENT ELECTRICAL PLANS at the location indicated. No other use is authorized or intended. E-Mail: info@StudioJAED.com STATE OF DELAWARE Website: www.StudioJAED.com OMB / DIVISION OF FACILITIES MANAGEMENT CORPORATE HEADQUARTERS 2500 WRANGLE HILL ROAD, STE. 110 BEAR, DE 19701 P: (302) 832-1652 F: (302) 832-1423 OMB PROJECT #MJ1002000009 CAPITOL COMPLEX LIGHTING UPGRADES LOCATION MAP AREA MAP DOVER, DE 19901 CAPITOL COMPLEX LIGHTING UPGRADES OMB PROJECT MJ1002000009 STATE OF DELAWARE DOVER, DELAWARE 19901 SYMBOLS LEGEND PROJECT COVER SHEET BID DOCUMENTS NOVEMBER 20, 2015 DLD PP SITE MAP G 1.0 14077

Paj 15

E-1 TYPICAL LIGHT POLE SCOPE OF WORK (PROVIDE TO ALL LIGHT POLES UNLESS NOTED OTHERWISE): E-1 DEMOLISH OLD LUMINAIRE AND PROVIDE NEW LUMINAIRE, MOUNT LED DRIVER, CONNECT LUMINAIRE TO DRIVER, AND PROVIDE NEW GROUND WIRE WHIP FASTENED TO POLE. TAP AND PROVIDE (3) SET SCREWS TO SECURELY FASTEN LIGHT FIXTURE TO POLE TOP. PROVIDE 3" SLEEVE TO CONCEAL SET SCREWS AND FITTING; WHICH SHALL BE PAINTED TO MATCH NEW LUMINAIRE IN COLOR AND FINISH. E-2 DEMOLISH EXISTING THWN POLE WIRING AND PROVIDE NEW SO CORD (2#12+1#12G) WITH STRAIN RELIEF (TO BE PROVIDED WITH LUMINAIRES) AND FUSED, MOISTURE-RESISTANT SPLICE AT POLE BASE (TRON MODEL # BK/HEB-AA OR APPROVED EQUAL). SO CORD SHALL BE PROVIDED WITH MINIMUM 24" CABLE SLACK. CONNECT TO NEW LUMINAIRE DOOR OVER THE INTERIOR ALLOWS ACCESS TO BREAKERS AND EXISTING FEEDER. PROVIDE 2A FUSE FOR EACH FUSED SPLICE. (AS IN STANDARD TRIM). WITH THIS DOOR CLOSED, SCREWS THAT SECURE THE TRIM TO THE INTERIOR DEADFRONT AREA E-3 ADD ALTERNATE #3 - REMOVE POLE SKIRTING, PAINT POLE BASE, PAINT POLE SKIRTING, PAINT ENTIRE SURFACE OF PROTECTED FROM REMOVAL BY UNAUTHORIZED PERSONS. LIGHT POLE, AND REINSTALL POLE SKIRTING. COLOR AND FINISH IS TO MATCH THAT OF NEW LUMINAIRE. CONCRETE BASE IS NOT TO BE PAINTED. BOX GENERAL NOTES: 1. CONTRACTOR IS TO MEG-OHM TEST ALL EXISTING INTERCONNECTING WIRING BETWEEN LUMINAIRES, UNDERGROUND PULLBOXES, JUNCTION BOXES, AND SOURCE PANELS. ANY EXISTING, INTERCONNECTING FEEDER RUNS WHICH ARE HINGE TRIM FOUND TO BE FAULTY ARE TO BE REPLACED IN EXISTING CONDUIT. 2. CONTRACTOR IS TO RECORD LAYOUT OF INTERCONNECTING WIRING AND DEVELOP A SITE PLAN INCLUDING ALL CONDUCTORS RELATED TO LIGHTING WITHIN THE SCOPE OF WORK -- INCLUDING NEW AND EXISTING CONDUCTORS TRIM IS SECURED TO BOX LIP WITH AND CONDUITS. AS-BUILT DRAWINGS SHALL BE DELIVERED TO OWNER PRIOR TO PROJECT COMPLETION. SCREWS, AND ALSO TO THE PANEL INTERIOR DEADFRONT (AS ARE 2. CONTRACTOR IS TO FIELD MEASURE ALL POLE TOP FITMENTS TO ENSURE A PROPER FIT OF NEW LUMINAIRE AND STANDARD MHC TRIMS). WITH TRIM PROVIDE ADAPTER HARDWARE AND SLEEVES TO CONCEAL FASTENERS AS REQUIRED, WHICH SHALL BE PAINTED TO HINGED TO BOX, IT ALLOWS ACCESS MATCH NEW LUMINAIRE IN COLOR AND FINISH. TO GUTTER AREA WITHOUT HAVING TO REMOVE TRIM. 3. CONTRACTOR TO REMOVE AND REINSTALL ACCESS PANELS IN EXISTING POLES, HAND HOLES, AND UNDERGROUND PULL BOXES AS REQUIRED TO FACILITATE WORK. CONTRACTOR IS RESPONSIBLE FOR REMOVING DIRT / GRADING TO A SECONDARY LOCK IS AVAILABLE ACCESS UNDERGROUND PULL BOXES, AND IS RESPONSIBLE FOR PROVIDING NEW STAINLESS STEEL FASTENERS (1/4" ON SOME HINGED TRIMS (FACTORY HEX HEAD, BLACK) FOR ANY FASTENERS DAMAGED DURING WORK. CONTRACTOR TO REMOVE ANY DIRT / GRADING ASSEMBLED ONLY) WHICH LATCHES FROM CONCRETE POLE BASES AND PROPERLY SET SKIRTS FLAT ON CONCRETE BASES AS PART OF BASE BID. TOM BOX LIP E-2 ELECTRICAL SYMBOL LEGEND E-3 Power Devices TYPICAL FULLY HINGED SURFACE MOUNTED DOOR AND TRIM DETAIL SCALE: NTS LIGHTING CONTACTOR, IN NEMA 1 ENCLOSURE, H-O-A SWITCH. MECHANICALLY HELD, 120V COIL, 3 POLE CIRCUIT BREAKER TYPICAL LIGHT POLE ELEVATION SCALE: NTS PHOTOCELL UTILITY METER FUSIBLE DISCONNECT SWITCH FOR MOTOR CONTROL CENTER WITH RKI FUSE CLIPS. REVISIONS DRY TYPE TRANSFORMER, 3 PHASE, NEMA1 ENCLOSURE DESCRIPTION DATE This drawing is property of Spring City Elect. Mfg. and is issued to the 1) FINIAL: CAST ALUMINUM, 356 ALLOY, SECURED WITH (1) 1/4"-20 SET SCREW 7) KEYSLOTTED DRIVER HOUSING: SPUN ALUMINUM, 12) 10kv SURGE PROTECTOR recipient with the understanding that it shall not be copied, duplicated, passed Site Lighting Devices 2) COOLCAST¥ HEAT DISSIPATING ROOF: CAST ALUMINUM, 356 ALLOY, SECURED WITH (3) 10-24 ROUND HEAD MACHINE SCREWS 13) QUICK DISCONNECTS: ELECTRICAL COMPONENTS on to unauthorized parties, nor used for any purpose other than that for which it is specifically furnished except with Spring City's written permission. SECURED WITH (4) 10-24 ROUND HEAD MACHINE SCREWS 8) CIMCON iSLC-3300 PLUG AND PLAY WIRELESS LIGHTING SUPPLIED WITH QUICK DISCONNECTS CONTROLLER POLE - TOP LUMINAIRE 3) CROSSFIRE¥ OPTICAL SYSTEM: INJECTION MOLDED REFLECTIVE OPTICS, 14) GASKET: NEOPRENE GASKET TYPE II (ASYMMETRIC) DISTRIBUTION 9) LUMINAIRE CASING: CAST ALUMINUM, ALLOY 356 15) 1 WATT CREE XPE LED UNDERGROUND, RECESSED PULLBOX / JUNCTION BOX 4) LUMINAIRE CAGE: CAST ALUMINUM, ALLOY 356 10) GASKET: NEOPRENE GASKET 16) VENT HOOD DOME: CAST ALUMINUM, ALLOY 356 5) POWER CABLE: BUNDLED POWER CABLE WITH QUICK DISCONNECTS 11) LED DRIVERS: LOCATED IN SPUN HOUSING, DRIVERS TO BE DETERMINED (BASED ON REQUIRED WATTAGE) 6) PANELS: SEEDED ACRYLIC 20-1/2" LUMINAIRE SPECIFICATIONS STYLE: YORKTOWN LIGHTING FIXTURE SCHEDULE 1 HEIGHT: 38 3/8" FIXTURE LAMPS VOLTAGE MOUNT FIXTURE DESCRIPTION MANUFACTURER / CATALOG # REMARKS 16 WIDTH: 20 1/2" MATERIAL: CAST ALUMINUM ALLOY A.N.S.I. 356, PER SPRING CITY ELECTRICAL: ALMYRK-LE080/EVX/X2-40- A.S.T.M. B26-95 A LED 208V POLE-TOP 6-SIDED LED LUMINAIRE - CR3-YPBP-FBR-CU FINISH: POWDER COATED - GLOSS BLACK NOTES: CONTRACTOR IS TO MODIFY AND DRILL EXISTING POLE-TOP FITTING AS REQUIRED FOR SECURE INSTALLATION OF NEW LUMINAIRES WITH SET 2 SCREWS PROVIDED WITH LUMINAIRES. CONTRACTOR TO FURNISH (5) ADDITIONAL SPARE LUMINAIRES WITH DRIVERS AND WIRE WHIPS. LAMPING: 80 WATT LED 15 3 VOLTAGE: ELECTRONICALLY WIRED AT 120-277 14 VOLTS COLOR TEMP: 3000K (WARM WHITE) DISTRIBUTION: TYPE III (ASYMMETRIC DISTRIBUTION) 13 4 38 3/8" GLOBE: PEBBLED ACRYLIC CATALOG NO.: ALMYRK-LE080/EVX/X2-40-CR3-YPBP-FBR-CU 5 12 6 11 7 10 8 Spring City Electrical Mfg. Co. HALL AND MAIN STREETS - P.O. BOX 19 - SPRING CITY, PA. 19475 PHONE (610) 948-4000 - FAX (610) 948-5577 - WWW.SPRINGCITY.COM 9 DESCRIPTION THE YORKTOWN LED LUMINAIRE CUSTOMER STATE OF DELAWARE-DOVER, DE PROJECT LUMINAIRE TO ACCEPT A JOB LEGISLATIVE MALL 3" DIA. X 3" HIGH TENON SCALE DRAWN BY: DATE DRAWING NO. N.T.S. Y.V. 11-05-14 FIX-29020 SHEET TITLE TYPICAL POLE-TOP LUMINAIRE DETAIL SCALE: NTS DRAWN CHK'D/DESIGNER DISCIPLINE SHEET NO. PROJECT NO.

Paj 16

ADD ALTERNATE #1 - TOWNSEND BUILDING A A A A A A A A A A A A A A ADD ALTERNATE #2 - BIGGS MUSEUM A A A A A A A A A A A A A A A A A A A A A A A A A A A A REVISIONS DESCRIPTION DATE A A A A A A A A A A A A A SHEET TITLE SCALE: 1" = 50' AREA A AREA B DRAWN CHK'D/DESIGNER AREA C DISCIPLINE SHEET NO. KEY PLAN PROJECT NO.

Paj 17

A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A ELECTRICAL NOTES: A A E-1 REMOVE EXISTING POLE-TOP LUMINAIRE, DISCONNECT INCOMING FEEDER A FROM LED DRIVER, RECONNECT FOR 208V, AND RE-INSTALL LUMINARE. A A A A A A A A A A A A A A REVISIONS A DESCRIPTION DATE A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A E-1 E-1 E-1 E-1 E-1 A A SHEET TITLE AREA A AREA B SCALE: 1" = 50' DRAWN CHK'D/DESIGNER AREA C DISCIPLINE SHEET NO. KEY PLAN PROJECT NO.

Paj 18

ELECTRICAL NOTES: E-1 REMOVE EXISTING POLE-TOP LUMINAIRE, DISCONNECT INCOMING FEEDER FROM LED DRIVER, RECONNECT FOR 208V, AND RE-INSTALL LUMINARE. A A A AREA B E-1 E-1 E-1 AREA C A E-1 A A A A A A REVISIONS A A DESCRIPTION DATE A A A A A A A A A A A A A A A A A A A A A AREA A AREA B SHEET TITLE SCALE: 1" = 50' AREA C DRAWN CHK'D/DESIGNER KEY PLAN DISCIPLINE SHEET NO. PROJECT NO.

Paj 19

LIGHTING SURVEY FOR STATE OF DELAWARE CITY OF DOVER - KENT COUNTY DELAWARE 1"=400' LOCATION MAP CM-03 CM-02 STATE OF DELAWARE CM-04 KEY MAP 1"=500' R Know what's STANDARD LIGHT POLE

Paj 20

CM-03 CM-02 CM-04 KEY MAP 1"=500' STATE OF DELAWARE R Know what's

Paj 21

CM-03 CM-02 CM-04 KEY MAP 1"=500' STATE OF DELAWARE R Know what's

Paj 22

CM-03 CM-02 CM-04 KEY MAP 1"=500' STATE OF DELAWARE R Know what's

Tounen nan reyinyon sa a