CITY OF DOVER PLANNING COMMISSION
AGENDA
Monday, April 15, 2013 – 7:00 P.M.
City Hall Council Chambers
15 Loockerman Plaza, Dover, Delaware
PLEDGE OF ALLEGIANCE
ROLL CALL
APPROVAL OF AGENDA
ADOPTION OF MINUTES OF REGULAR MEETING of March 18, 2013
COMMUNICATIONS & REPORTS
1) Reminder: The next Planning Commission Quarterly Workshop is scheduled for
Tuesday, May 21, 2013 at 4:00pm in the City Hall Conference Room.
2) Reminder: The next Planning Commission regular meeting is scheduled for Monday,
May 20, 2013 at 7:00pm in the City Council Chambers.
3) Report on City Council actions
4) Update on Planning activities
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
OLD BUSINESS
1) Requests for Extensions of Planning Commission Approval:
a) C-11-02 4-H After School Program at Capitol Green Community Center – Request for a
second one year extension of the Planning Commission approval granted April 18, 2011 for
a Conditional Use Plan to permit use of an after school program (Day Care Center) for
grades K-6 within the existing community center at 416 Sussex Avenue. The property is
zoned RG-1 (General Residence Zone). The property is located on the south side of Sussex
Avenue east of River Road. The owner of record is Capitol Green Apartments, LLC.
Property Address: 416 Sussex Avenue. Tax Parcel: ED05-077.10-02-08.00-000. Council
District 4. Previously, a one year extension was granted on April 16, 2012 by the Planning
Commission.
NEW BUSINESS
NEW DEVELOPMENT APPLICATIONS
1) S-13-05 Lands of KGH Development Corporation at 625 South State Street – Public Hearing
and Review of an Site Plan for the expansion of the existing parking lot for an additional 130
parking spaces located at 625 South State Street and 100 Scull Terrace. The property is zoned
IO (Institutional and Office Zone) and a portion of the property is subject to the SWPOZ
Paj 2
City of Dover Planning Commission Agenda
Public Hearing: April 15, 2013
Page 2 of 2
(Source Water Protection Overlay Zone) Tier 1 – Wellhead Protection Area and Tier 3 –
Excellent Recharge Area. The property is located east side of South State Street in the block
between South Street and Hope Street. The owners of record are KGH Development
Corporation and Central DE Surgery Center. Addresses: 625 South State Street, 100 Scull
Terrace, and 150 Scull Terrace. Tax Parcel: ED-05-077.13-01-51.00-000. Council District 2.
Waiver Requested: Partial Elimination of Curbing and Consideration of Joint Parking
Facilities
2) S-13-06 US Gas at 461 North DuPont Highway – Public Hearing and Review of a Site Plan
to allow for the addition of a fenced paved area consisting of 6,861 SF of impervious surface
located at 461 North DuPont Highway. The property is the location of an existing automobile
service station with fuel sales. The property is zoned C-4 (Highway Commercial Zone). The
property is located on the southeast corner of North DuPont Highway and Townsend
Boulevard. The owner of record is US Gas, LLC. Address: 461 North DuPont Highway.
Tax Parcel: ED-05-068.13-01-55.00-000. Council District 3. Waivers Requested: Reduction
of Arterial Street Buffer and Partial Elimination of Curbing.
ADJOURN
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS
SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS,
INCLUDING EXECUTIVE SESSIONS.
Posted Agenda: April 5, 2013 at 1:45pm
Paj 3
CITY OF DOVER PLANNING COMMISSION
March 18, 2013
The Regular Meeting of the City of Dover Planning Commission was held on Monday, March 18,
2013 at 7:00 PM with Vice Chairman Tolbert presiding. Members present were Mr. Holden, Mr.
Shomo, Mr. Holt, Mr. Baldwin, Dr. Jones and Ms. Still. Mr. Ambruso and Colonel Welsh were
absent.
Staff members present were Mrs. Townshend, Mrs. Melson-Williams, Ms. Cornwell, Mrs. Duca,
and Mrs. Mullaney. Also present were Mr. Gregory Moore, Mr. Garth Jones and Mr. Ian Cohen.
Also speaking from the public were Mr. Jerome Emerson, Mrs. Denise Jones, Ms. Kelly Harris, Mr.
Leonard Roberts, Mr. Vincent Carney, Mr. Skip Cohen, Mr. James Jones, Mr. Chris Lindbloom,
Mr. Clarence Richardson and Mrs. Linda Lushbaugh.
APPROVAL OF AGENDA
Dr. Jones moved to approve the agenda as submitted, seconded by Mr. Holt and the motion was
unanimously carried 7-0 with Mr. Ambruso and Colonel Welsh absent.
APPROVAL OF THE PLANNING COMMISSION MEETING MINUTES OF FEBRUARY
19, 2013
Ms. Still moved to approve the Planning Commission minutes of February 19, 2013, seconded by
Mr. Holden and the motion was unanimously carried 7-0 with Mr. Ambruso and Colonel Welsh
absent.
APPROVAL OF THE QUARTERLY WORKSHOP MEETING MINUTES OF FEBRUARY
20, 2013
Mr. Baldwin moved to approve the Quarterly Workshop minutes of February 20, 2013, seconded by
Dr. Jones and the motion was unanimously carried 7-0 with Mr. Ambruso and Colonel Welsh
absent.
COMMUNICATIONS & REPORTS
Mrs. Townshend stated that the next Planning Commission meeting will be held on Monday, April
15, 2013 at 7:00PM in the City Hall Council Chambers.
Mrs. Townshend provided an update on the regular City Council and Utility Committee meetings
held on March 11, 2013.
Mrs. Townshend noted that the workshop held on February 26, 2013 for Discussion of the Role and
Scope of the Historic District Commission and Historic District was well attended. Several good
ideas about procedures were received and a survey will be forthcoming.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Townshend presented the audience information on policies and procedures for the meeting.
OLD BUSINESS
1.) Requests for Extensions of Planning Commission Approval: None
1
Paj 4
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
NEW BUSINESS
NEW DEVELOPMENT APPLICATION
1) Applicant’s Request:
a) Applicant’s Request to Consider Amending a Condition Previously Adopted (Approved)
Regarding S-12-12 Delaware State University Applied Optics Research Building: Site
Development Master Plan – Request to consider amending the Condition of Requiring Parcel
Consolidation as associated with the conditional approval of the Site Development Master Plan
for Delaware State University Applied Optics Research Building project. The three phase
project on the Delaware State University Campus consists of the relocation of three existing
modular buildings (4,280 SF, 1,696 SF and 1,696 SF) and the construction of two Applied
Optics Research Buildings: Building 1 of 4 stories and 30,700 SF and Building 2 of 5 stories
and 44,232 SF (total of 74,932 SF of new building) along with associated site improvements.
The subject property is zoned IO (Institutional and Office Zone) and is subject to the SWPOZ
(Source Water Protection Overlay Zone) Tier 3 – Excellent Recharge Area. The property is
located on the west side of North DuPont Highway north of College Road. The owner is State
of Delaware c/o Delaware State University. Address: 1200 North DuPont Highway. Tax
Parcels: Portion of ED-05-057.00-01-21.00-000, ED-05-057.00-19.00-000 and ED-05-057.00-
01-20.00-000. Council District 4. This Site Development Master Plan application received
conditional approval at the Planning Commission Meeting of June 18, 2012.
Representatives: None
Mr. Holden recused himself from this application. His employer was the engineer of record on this
project.
Dr. Jones also recused herself from this application as well, due to teaching at the University.
Mrs. Townshend stated that a request from Delaware State University was received requesting that the
Planning Commission amend one of the conditions of approval granted by the Commission on June
18, 2012. The request is related to S-12-12 Site Development Master Plan for the Applied Optics
Research Building.
In consultation with the City Clerk and the City Solicitor, it was determined that under Robert’s Rules
of Order, the condition that the University is requesting can be amended but it would take the Planning
Commission making a motion to amend their previous motion before it could be discussed. The
applicant is requesting that the condition that multiple parcels on the campus be consolidated as a part
of the application approval, be amended by the Planning Commission. The request has been placed on
the agenda by Staff so that the Planning Commission has the option of amending the motion that was
approved on June 18, 2012. The Commission cannot initiate discussion on the request unless a motion
is made and seconded to amend the motion of June 18, 2012 granting conditional approval of the Site
Development Master Plan as that motion relates to the requirement of the parcels to be consolidated.
If such a motion is made and seconded, the floor can be opened for questions of the Staff or the
2
Paj 5
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
Applicant and discussion. Only the condition that is on the published agenda in reference to the parcel
consolidation can be part of the discussion or amended motion. If a member of the Planning
Commission wishes to discuss the request, they can make the motion even if it’s for reasons of
discussion.
Ms. Still stated in accordance with notice given on the published agenda, I move to amend the motion
of June 18, 2012 approving S-12-12 Delaware State University Applied Optics Research Building Site
Development Master Plan, by removing the condition that the parcels be consolidated, seconded by
Mr. Baldwin and the motion was unanimously carried 7-0 with Mr. Ambruso and Colonel Welsh
absent.
Mr. Holt questioned if the parcel would be kept separate and not merged in with the rest of the
University property? Responding to Mr. Holt, Mrs. Townshend stated that the condition that was part
of the approval is that the multiple parcels that make up Delaware State University would be required
to be consolidated. Also as part of that consolidation for the land hooked parcel that crosses College
Road, a parcel line at the road would be added. North of College Road there are three (3) parcels and
not all of them have frontage. Also the SWPOZ (Source Water Protection Overlay Zone) is used in
terms of how things are calculated. For a number of reasons, Staff had recommended that the parcels
be consolidated. She deferred to Mrs. Melson-Williams since she has done the plan review of this
application and is better prepared to talk about the locations of the parcel lines.
Mrs. Melson-Williams stated that this was part of the Site Development Master Plan review that
occurred before the Planning Commission in June 2012. There are three (3) parcels of land identified
by tax parcel I.D. numbers that make up the Delaware State University Campus. It was a
recommendation of Staff to consolidate those parcels into one tract of land. The Planning Commission
had previously made that recommendation with a previous project in 2009 that the existing three (3)
parcels be consolidated and that the one parcel that is divided by the current location of College Road
be separated into two (2) parcels as that area of the Campus is zoned differently. The area south of
College Road was subject to a previous plan for development of its own that has since expired. The
recommendation to consolidate the parcels was made because several of the parcels lack frontage on a
public street and it also would add convenience to how Staff has to calculate the provisions for the
SWPOZ (Source Water Protection Overlay Zone) when it comes to the limitations related to the
impervious surface coverage limits of that zone. The applicant did make a letter request and submitted
a boundary survey document as well as an aerial photograph. The Planning Staff included the full
Development Advisory Committee Report that the Commission members were issued and acted upon
in June 2012. A copy of the Notice of Decision letter related to the action taken in June 2012 and also
the excerpt of the Planning Commission meeting minutes from that date which includes extensive
testimony about the parcel consolidation both from Staff and the applicant’s representative that
appeared at that meeting.
Mrs. Townshend stated that a “yes” vote is a vote to eliminate the requirement that the parcels be
consolidated.
The motion to amend the approval removing the condition of parcel consolidation was unanimously
carried 5-0 by roll call vote with Ms. Still, Mr. Baldwin, Mr. Holt, Mr. Shomo, and Mr. Tolbert voting
yes. Mr. Holden and Dr. Jones were recused and Mr. Ambruso and Col. Welsh were absent.
3
Paj 6
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
AX-13-01 Lands of Sipple’s Used Cars at 1174 South Governors Avenue – Public Hearing and
Recommendation to City Council on the Rezoning Request associated with the Annexation of one
parcel of land totaling 8,250 SF +/- located at 1174 South Governors Avenue. The property is
currently zoned BG (General Business District) in Kent County. The proposed zoning for the property
is C-2A (Limited Central Commercial Zone). The property is located west of South Governors
Avenue south of Lynnhaven Drive. The annexation category according to Dover’s 2008
Comprehensive Plan is Category 1: High Priority Annexation Area and the land use designation is
Commercial. The owner of record is Sipple’s Used Cars, Inc. Address: 1174 South Governors
Avenue. Tax Parcel: ED-00-086.05-01-12.00-000.
Representatives: None
Mrs. Townshend stated that the request is for an annexation and rezoning. The Planning
Commission’s role in this is to review and make a recommendation to City Council as it relates to the
rezoning. The current zoning of the property is BG (General Business District) in Kent County. The
proposed zoning is C-2A (Limited Central Commercial Zone) in the City of Dover. The property
shows in the City of Dover’s Comprehensive Plan as a Category 1 High Priority Annexation Area. It
is one of the areas that is largely surrounded by the City. The potential land use for annexation
indicates that it would receive a commercial designation if annexed into the City of Dover. The
requested zoning is C-2A (Limited Central Commercial Zone) and looking at the surrounding zonings,
all of the properties that are within the City of Dover and adjacent to the subject property are also
zoned C-2A (Limited Central Commercial Zone). Looking at the properties there is a church and
Creekstone Office Complex which are both zoned C-2A (Limited Central Commercial Zone). The
properties that are in Kent County are BG (General Business District). The C-2A (Limited Central
Commercial Zone) is consistent with the surrounding land uses and zoning classifications as well as
with the Comprehensive Plan.
Mr. Tolbert questioned if this was a used car lot? Responding to Mr. Tolbert, Mrs. Townshend stated
that it was not a used car lot. The property was owned by Sipple’s Used Cars and this property is a
residential parcel. It’s zoned business but it is used residentially.
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Mr. Holt moved to approve AX-13-01 Lands of Sipple’s Used Cars at 1174 S Governors Avenue,
recommending to City Council a rezoning from BG (General Business District) to C-2A (Limited
Central Commercial Zone), seconded by Dr. Jones and the motion was unanimously carried 7-0 with
Mr. Ambruso and Colonel Welsh absent.
C-13-02 Offices of E-Z Pass at 22-24 West Loockerman Street – Public Hearing and Review of a
Conditional Use Plan to allow for the establishment of an office on the first floor of an existing building at
22-24 West Loockerman Street. The property is zoned C-2 (Central Commercial Zone) and is subject to
the H (Historic District Overlay Zone). The property is located on the south side of West Loockerman
Street west of South State Street. The owner of record is Downtown Dover Partnership. Address: 22-24
West Loockerman Street. Tax Parcel: ED-05-077.09-04-16.00-000. Council District 4.
Representatives: Mr. Gregg Moore, President of Downtown Dover Partnership; Mr. Lou Colon,
Executive Director of Downtown Dover Partnership
4
Paj 7
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
Mr. Holden recused himself from this application as his employer is the engineer of record.
Ms. Cornwell stated that this is a Conditional Use application for the use as an office on the first floor
of the property located at 22-24 West Loockerman Street. The property is zoned C-2 (Central
Commercial) and is subject to the Historic District. The use as an office on the first floor on West
Loockerman Street for properties located between State Street and New Street requires a Conditional
Use. The Planning Commission previously reviewed and approved the Site Plan for improvements to
the rear plaza area in December 2012. Building Permits have also been issued administratively for
other work inside of the building. The office use is to establish E-Z Pass on the first floor of the
building and a small portion of that area will be used as retail. They will also be using about 2,000
square feet of the basement. A number of the site items have been addressed as part of the Site Plan.
The other agencies reviewing this application have provided their comments in the DAC Report.
Mr. Moore stated that they are pursing E-Z Pass as the tenant for this building. Their hope is that once
DelDOT actually chooses the E-Z Pass vendor, they will be able to negotiate with them and put them
into this building. He wanted to be clear that there are currently two (2) vendors vying for that E-Z
Pass program and they are unable to negotiate until DelDOT has elected a vendor. The one specific
detail that they are aware of is that sixty (60) people will be in the building.
Mr. Moore further stated that they are not exactly certain what the layout of the building will be. When
they filed the application, they were hoping that they would have a retail component on the frontage.
He believes that there will be retail but this will have to be worked out once the vendor is selected. If
approval is given they would like to be granted approval to have office on the first floor and then
provide Staff their layout once they know what it will be.
Mr. Tolbert questioned if the office located at the Toll Plaza will still remain open? Responding to Mr.
Tolbert, Mr. Moore stated that he believed there would still be a small function of E-Z Pass at the Toll
Plaza. This is actually a back of the house E-Z Pass where they have a call center, they do paperwork
and they will have customers make payments.
Mr. Tolbert opened a public hearing and after seeing no one wishing to speak, closed the public
hearing.
Dr. Jones moved to approve C-13-02 Offices of E-Z Pass at 22-24 West Loockerman Street, along with
the Staff recommendations, seconded by Mr. Shomo and the motion was unanimously carried 6-0 with
Mr. Holden recused and with Mr. Ambruso and Colonel Welsh absent.
S-13-03 Lands of Boyles at 527-529 South State Street – Public Hearing and Review of a Site
Development Plan application and Architectural Review Certification to permit the construction of a
parking lot. The property is zoned RGO (General Residence and Office Zone) and is subject to the H
(Historic District Overlay Zone) and SWPOZ (Source Water Protection Overlay Zone) Tier 3 –
Excellent Recharge Area. The property is located on the northeast corner of South State and Elm
Terrace. The owners of record are William and Lisa Boyles. Address: 527-529 South State Street.
Tax Parcel: ED-05-077.09-05-47.00-000. Council District 2. Waiver Requests: Reduction in Parking
Requirement and Elimination of Curbing.
5
Paj 8
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
Representatives: Mr. Garth Jones, Becker Morgan Group
Mr. Holden recused himself from this application as his employer is the engineer of record.
Mrs. Melson-Williams stated that this is a Site Plan application for the Lands of Boyles located at 527-
529 South State Street. It is a proposal for a parking lot to be constructed at the rear of the building
that is located on the site. Since the property is located within the City of Dover’s Historic District, it
has been reviewed by the Historic District Commission and a recommendation regarding the
Architectural Review Certification for the project has been forwarded to the Planning Commission.
Specifically, it is a separate report titled “Architectural Review Report Recommendation Report”. The
Historic District Commission considered the application at their meeting held on February 21, 2013
and they are recommending approval of the Architectural Review Certification. However, since this
application has to come before the Planning Commission for Site Plan review the Planning
Commission will take final action in regards to that Architectural Review Certification. This action
will need to be part of the motion or as a separate motion. Reference can be made to the Architectural
Review Recommendation Report and the comments and recommendations of the Historic District
Commission, making any additions or changes that are deemed necessary for certification of the
project.
Mrs. Melson-Williams further stated that the project involves construction of a parking lot to the east
of the building that fronts on State Street. This is a corner property located at South State Street and
Elm Terrace. The parking lot would take access off of an alley that runs to the rear of property. It is a
parking lot consisting of seven (7) spaces and it would be paved. Other aspects of the site include a
proposal for a fence that would extend along South State Street, Elm Terrace and to the entrance of the
parking lot. The fence is proposed as a black decorative metal fence, four (4) feet in height with the
exception of the corner visibility area at South State Street and Elm Terrace where the height of the
fence is limited to three (3) feet by code. The other aspects related to this project include landscaping.
There is a proposal for shrubs along the Elm Terrace frontage of the property. The site with its
existing trees, meets the tree planting requirements of the Zoning Ordinance. Along the north side of
the property there is an existing shrubline that has been trimmed recently that provides screening for
the parking lot on that side.
Mrs. Melson-Williams stated that the applicant is requesting two (2) waivers in regards to this project.
The first, being a waiver from the up-right curbing requirement. Parking lots typically require up-right
curbing unless deemed to be removed due to stormwater management practices. The applicant is
seeking to build the parking lot without the up-right curbing seeing that the current drainage flows
across the property. In this case, the drainage would flow from the parking lot through a grass area on
the site that will be lawn as part of this project. The second waiver is a request for a reduction in the
required parking for the site. The property is zoned RGO (Residence General and Office Zone).
Currently, the building consists of three (3) apartments. Those apartments would require a total of
seven (7) parking spaces on site which this parking lot proposal would accommodate. However, the
RGO (Residence General and Office Zone) of the property also allows for the use of the building as
offices and since this application was being presented to the Planning Commission, Staff
recommended that the applicant pursue a waiver reduction related to what would be a parking
requirement for office use of the building, should that happen in the future. Based on the size of the
building, the office use would require ten (10) parking spaces. However, the Zoning Ordinance allows
for a parking waiver to be considered. The Planning Commission can actually grant a waiver for up to
6
Paj 9
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
50%. The applicant’s request is for a 30% reduction, bringing the parking requirement down to the
seven (7) spaces that they are proposing. The project is within the redevelopment target area for the
Downtown. It is eligible for a 20% parking reduction because of its location. The applicant has
provided some reasoning for their request noting mass transit in the area and the ability to walk in the
area due to existing sidewalks along South State Street and along the Elm Terrace frontage of this
property. The property also proposes a bike rack to be located on site which meets the bicycle parking
requirements of the Code.
Mrs. Melson-Williams further stated that this project was reviewed by the Development Advisory
Committee for the City of Dover and those agencies have provided their comments. The City’s Public
Works Office has asked for some calculations related to stormwater management to ensure that the
run-off from this parking lot can be adequately handled by what exists in the area. DelDOT has no
comments on this application as they are not taking access off of a State maintained road. The alley is
a City of Dover alley. Kent Conservation District notes that they are not reaching the thresholds that
require a full storm-water management plan for their review.
Mr. Jones stated that they did meet with the DAC Committee and they are in agreement with the
comments. As Mrs. Melson-Williams mentioned as part of the request, we are asking for two (2)
waivers. One waiver request is the elimination of the up-right curbing. Right now the drainage flows
across the site and they would like to continue that pattern. It will flow across a lawn area which they
believe will provide water quality treatment although it’s not required. The second waiver request is to
reduce the parking requirements for an office use from ten (10) spaces to seven (7) spaces, in case this
is ever changed into an office use.
Mr. Tolbert opened a public hearing.
Mr. Jerome Emerson – Christ Episcopal Church 523 South State Street Dover DE 19901
Mr. Emerson stated that he was representing Christ Episcopal Church. They are neighbors to the
property in discussion. He rises in support of the project. One reason is that they are exceptionally
good neighbors. They have assisted with snow removal and bush removal. Getting the parking off of
Elm Terrace and in behind the house will really improve the traffic flow which goes into the Church’s
main parking lot. So they look forward to this project taking place and they are very supportive of the
Boyles property and their proposal.
Mr. Tolbert closed the public hearing after seeing no one else wishing to speak.
Mr. Baldwin questioned if a reduction in parking was granted, did the applicant see any conflicts
between the people living in the apartments and the office workers? Responding to Mr. Baldwin, Mrs.
Townshend stated that in the case of having office uses there would no longer be apartments in that
building. The property is zoned so that it can be either apartments or offices so it’s likely to be one or
the other not both.
Mr. Baldwin moved to approve S-13-03 Lands of Boyles at 527-529 South State Street, along with the
two waiver requests for up-right curbing and the reduction of parking spaces and also the
Architectural Review Certification, seconded by Dr. Jones and the motion was unanimously carried
6-0 with Mr. Holden recused, and with Mr. Ambruso and Colonel Welsh absent.
7
Paj 10
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
MI-13-04 Clearview Meadows PND: Revised Active Recreation Plan and Minor Subdivision Plan –
Review of Revised Active Recreation Plan #2 to eliminate the swimming pool facilities and add a
community building within the Active Recreation Area of the subdivision. Public Hearing and
Review of a Minor Subdivision Plan for lot revisions to relocate one lot and to create two additional
lots for a total of 305 residential lots. The subdivision is located on the north side of South Little
Creek Road, south of North Little Creek Road and east of Babb Drive. The subdivision is zoned
R-8 (One Family Residence Zone) and RM-1 (Medium Density Residence Zone) and subject to the
AEOZ (Airport Environs Overlay Zone). The owner of record is Shirliz, LLC. Tax Parcel of Active
Recreation Area: ED-05-077.07-06-98.00-000. Tax Parcels Affected by Minor Subdivision: ED-
05-077.07-06-96.00-000, ED-05-077.07-06-98.00-000 and ED-05-068.19-06-24.00-000. Council
District 2. Clearview Meadows went through the PND (Planned Neighborhood Design) process as
C-04-01 and SB-04-04P with approvals granted by the Planning Commission in April and
September 2004. Construction of the subdivision is underway with 63 of 303 dwelling units
complete.
Representatives: Mr. Ian Cohen, Shirliz, LLC
Mrs. Melson-Williams stated that this was an application associated with the subdivision known as
Clearview Meadows. The subdivision is located off of South Little Creek Road just east of Safeway
and also has a connection onto North Little Creek Road as well. There is also a connection onto Babb
Drive near the Luther Village project. There are two items for consideration by the Planning
Commission. The first is a Revised Active Recreation Plan which is being referred to as Revised
Recreation Plan #2. Also a Minor Subdivision Plan that is associated with it. The Clearview
Meadows subdivision was a project in the PND (Planned Neighborhood Design) Option that was
initially reviewed in 2004. This subdivision moved through the review process with the Planning
Commission and ultimately a Record Plan dividing the property into the lots that are present today was
recorded in September 2005. Final Construction Plans were approved in January 2006. The project as
approved consists of a total of 303 residential lots with a mix of single family dwellings, townhouses
and duplex units. The project has been under construction and is now currently owned by a different
developer than the one that took it through the process originally.
Mrs. Melson-Williams further stated that the applicant is requesting a revision to the Active Recreation
Plan. Any of the Active Recreation Plans that come before the Planning Commission first go through
review with the City of Dover’s Parks, Recreation and Community Enhancement Committee to look at
the technical side of the active recreation component and what they are providing. That occurred with
this Revised Plan #2 with the Parks, Recreation and Community Enhancement Committee most
recently. This Committee has issued a recommendation of support of the revisions to the Active
Recreation Area. The proposal for the changes to the Active Recreation Area consists of the
following: the elimination of what was a swimming pool that was proposed on the project and the
associated bath house. A copy of this was actually submitted to the Planning Commissioners. It also
involves the relocation of a gazebo seating element and the addition of a community building with an
associated parking lot. With this plan, the swimming pool was originally on the eastern side of what is
a large park like Active Recreation Area that is centrally located in the subdivision. With the change,
the swimming pool is eliminated and more of a walking path is just located in that area. The
community building is proposed on the western end of this park area at the terminus of what is John
Hunn Brown Road, the entrance road from South Little Creek Road onto the site. The community
building has interior space that consists of exercise room, a small meeting room and a large meeting
8
Paj 11
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
room along with associated restroom facilities, storage and a small kitchen area. The Active
Recreation Plan continues to include the playground area and the large walking path network system
that creates a loop through the park area as well as the inter-connections to the street network of the
subdivision. With this proposal for changes to the Active Recreation Plan, it precipitated some
revisions to the lot layout for the project site. With the location of the community building, it requires
that one lot be relocated. It is a single family residential lot and it is proposed to be relocated to the
eastern side of the park area and then an additional lot created in that space as well. A second
additional lot is proposed in the northern end of the subdivision closer to North Little Creek Road in
what was previously an open space area. Even with these changes to the open space areas the project
continues to meet the land area requirements for open space for the PND (Planned Neighborhood
Design) as well as the amount of Active Recreation Area necessary for the subdivision which is based
on the number of units within the subdivision itself.
Mrs. Melson-Williams stated that the plan was reviewed by the Planning Office; they have noted some
of the technical side of things related to construction and some updates to the plan which will be
necessary with the lot revisions that are proposed. The project also moved through the City of Dover’s
Development Advisory Committee and there are advisory comments from the City of Dover’s Public
Works Office related to water and sewer service with what will be the new lots. DelDOT has no
comments specifically to this plan; they just note that the subdivision is part of some Letters of
Agreement related to off-site improvements. They will be working with the developer in regards to
implementation of those items. The Kent Conservation District notes that this aspect of the project
does not require the development of a detailed sediment and stormwater management plan. That was
done as part of the overall subdivision and the large stormwater management facility already exists on
the property. There were a variety of attachments in the provided packets, including a revised layout
for the community building which changed the location of the driveway due to some existing utility
infrastructure that was located where it was originally proposed. There are also detailed estimates
regarding the improvements for the Active Recreation Area.
Mr. Cohen stated that Shirliz, LLC acquired the property about a year and a half ago, looked at the
plans in detail and have reviewed all of the economics that are tied into the subdivision that was
previously approved. They have determined that it is a much more practical amenity to create a
community center as opposed to a swimming pool. Being in the development business for decades
and their experience with swimming pools in developments of this size do not generally get installed
or properly used until you have approximately 80% of the community in place and paying dues
sufficient enough to support that. The subdivision currently has about sixty five (65) units either under
construction or completed and therefore getting to that 80% level is probably a decade away. The
reality is that they can create and develop a community center that can be used now as opposed to
something that may happen in the future. They did hold a community meeting where many people
were in support of the Active Recreation Plan but he was aware that there were some people present
who may be to the contrary of this plan. Their concept is to move this project forward. It languished
from many years and they are dedicated to getting this project moving. They believe that the
community center is the appropriate amenity to put in place as part of the overall community and
should enhance the ability to move the project forward.
Ms. Still questioned the time frame that they were anticipating for this construction? Responding to
Ms. Still, Mr. Cohen stated that subject to getting a Building Permit, they would hope to be under way
this year constructing the community center as well as some of the environs around the community
9
Paj 12
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
center.
Mr. Tolbert questioned if they intended to put a pool inside of the community center? Responding to
Mr. Tolbert, Mr. Cohen stated no, the pool would be eliminated altogether.
Mr. Tolbert opened a public hearing.
Denise Jones – 124 Nob Hill Road Dover DE 19901
Mrs. Jones stated that she was a resident of the community and that she had also previously worked
for the prior developer of the community in 2007. She and her husband were under the
understanding that there was going to be a pool and they have been anticipating this for many years.
They have been living at their residence for five (5) years and the pool has still not happened.
There are many homeowners who have been or are currently deployed that they have discussed this
proposal with. They all have been in agreement that we are anticipating or waiting for the pool.
The homeowners had not heard anything regarding not having the pool until they received a
certified letter two weeks ago. The revisions of where the developer is planning to construct the
community center is right at the end of the main street. They live four (4) houses away from this
location. According to the plan, the parking looks like it would be a nightmare for everyone living
on Nob Hill Road. Single family homes are on one side where there is plenty of parking, her
parking is in the rear and guests will park in the front. She has worked in many developments that
have had this situation and it does not work. She said they all would like to have the pool as they
were promised in their development. If the developer does not want to give them the pool then use
the two additional lots that they would be creating and turn them into a dog park.
Kelly Harris – 108 Nob Hill Road Dover DE 19901
Ms. Harris stated that she had sent an email to the Planning Office prior to this meeting. She is a
resident of the community. There are a total of seven (7) rental properties, one (1) vacant
townhome and one (1) vacant single family home on just Nob Hill Road. This leaves roughly ten
(10) occupied homes on this street. A few people that she spoke with were still in favor of the
swimming pool and they want to see progress in the neighborhood due to the fact of being stagnant
for so long. She does not feel that it is a good idea to put a community building within the
neighborhood unless it will have a pool. She explained that it is not like she lives in an apartment
and can move when her lease is up. She bought into something that she thought was going to be
there and a buying point was the swimming pool. She had print outs from a Realtor’s website,
advertising not only a pool but also a club house for the three (3) new homes being sold. She also
had case law from Case 08C08010JTV Reserve Management Lot vs. Thirty (30) lots. It states in
Paragraph 15: “The original declaration reserves development reserved a generic right to modify
restrictions; however, the exercise of such a right is not unlimited where a developer seeks to
enforce an amendment to restrictions against non-consenting owners who bought their lots before
the amendment was affective. The amendment must be reasonable in light of the original intent of
the developer and the lot owners. If it is not reasonable it is invalid. Reasonableness may be
ascertained from the declaration of restrictions and all of the intended facts and circumstances
relevant to the nature of the development.” She said that she had not seen any numbers showing
how much a pool is going to cost, how much the recreation center is going to cost or how much her
Homeowners Association fees are going to increase. She attended the meeting held on February 13,
2013 where no one was able to get an opinion in. The developers basically said this is what we are
planning to do. There were fifteen (15) homes that attended out of around sixty (60) homes. She
10
Paj 13
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
does not know how that is a positive outlook from a number of people if not even half of the
community attended the meeting. She also had an email from someone who was not able to attend
the meeting, stating that she was also in favor of the swimming pool.
Leonard Roberts – 100 Lady Bug Drive Dover DE 19901
Mr. Roberts stated that he is a resident of the community. He felt the pool was just one issue; there
are a lot of issues in this development. They lost the original contractor PCS Homes; now they have
Smart Homes LLC. At their closings on their homes, they were not told that they had a lot of
restrictions on their properties. He has a restriction line in the center of his backyard. He is not able
to place a shed or a fence there. It is intolerable that he is mowing the lawn for the City. When he
finally received the paperwork for this Revised Plan, it stated Lot 284 no fence or shed. In the
original copies of the prints, a stockade fence is supposed to be up along Lady Bug Drive to around
Nob Hill Road, which was an agreement with the neighboring church. When he went to the City of
Dover he questioned if the builder can put up a stockade fence at this location, why can he not put
up a fence on his property? The City’s reasoning is because the land is designated as farmland. A
permit for a shed was disapproved by the City of Dover due to him having a restriction. He can
only build ten (10) feet from the back of his house. He feels that this is similar to living in New
York City. He is caring for the lawn, but he cannot put up a fence to keep robbers from coming
across his property. People are disrespecting his wife in his own back yard and he feels that this is
unreasonable. The plan as a whole needs to be looked at because to him, 95% of this community
has restrictions on every property. He lives in a duplex on the corner right behind Safeway and
Target. He has all of that property and cannot do anything with it. He has dead trees that should
have been taken down because you can pull the bark off with your fingers. This is a disaster
waiting to happen at his house. He cannot find out if he owns the trees or if the City owns them.
The City told him that the trees are on common ground. He feels that there are a lot of things going
on in this development that need to be looked at by City Council. He also has a room inside the
house that gets cold air because the cold air return is under the third bedroom. A lot of things need
to be inspected because he feels like he threw his money out the window by purchasing this home.
Responding to Mr. Roberts, Mrs. Townshend stated that there is forty (40) foot no building line. In
the PND (Planned Neighborhood Design), there is a required forty (40) foot buffer along the
perimeter of the project boundary and that forty (40) foot buffer is on a number of private lots. This
is a problem that they have here and a couple of other places have the forty (40) foot buffer in place
as well.
Vincent Carney – 120 Lady Bug Drive Dover DE 19901
Mr. Carney stated that the forty (40) foot no building line was not explained to them when they
purchased the homes in this development. He was misled on a lot things when he purchased his
home. As far as in the back of his house, there are a lot of trees and the markers start further back
where he cannot build or place anything there. He said his grass is supposed to go further out but
the developer decided that they were not going to put it that far out because of the church. With the
first developers, there supposedly was a deal that the church would cut the trees down if the
developer built them a parking lot. The parking lot was built for them but then they decided to
leave the trees up. As for the swimming pool, his wife is in favor of the pool. He thinks that
instead of taking away the pool now, they should hold off on it until they have more houses built
and more income going towards the Homeowners Association fees and then it can be considered
again. If they construct the pool now, it will be hard on the people living there now because there
11
Paj 14
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
are not enough people to pay towards maintaining the pool. He also feels that he should be able to
place a shed on his property since he was told while purchasing his home that he would be able to
have one.
Skip Cohen – 132 Nob Hill Road Dover DE 19901
Mr. Cohen stated that he was also a resident of the community. The Homeowners Association that
they keep paying into month after month is now $13,000-$14,000 in arrears. He has no idea where
the money is going to because they are not seeing any results. As members of the Homeowners
Association, he does not see any progress. He has lived here since December of 2010. He and his
wife own one of the corner townhomes and they hear a lot of talk and promise from the developers.
He had with him, an ad from a Realtor about tot lots, walking trails, swimming pools; all of the
things that at issue here. Things that they were told initially that they would have but they do not
have. What they see out of their front door is heavy equipment that has been sitting there. It has
been used but not to develop anything of any value to a homeowner. They are clearing areas but
there are a lot of empty lots. All that they have seen in the last two (2) plus years is heavy
equipment and portable potty. Another thing that concerns him is that while there has been a delay,
promises and no action the development remains empty. This is inviting all kinds of crime. People
are cutting the tops off of the sewer grates. There was a quarter ton air conditioner that was stolen
and they attempted to steal a second one. One evening they looked out of their window and a
vehicle was set on fire.
James Jones – 124 Nob Hill Road Dover DE 19901
Mr. Jones stated that he moved into the development in 2007. At that time, a lot of amenities that
have been mentioned this evening were promised. They have dealt with a lot of neglect in the
community. When it snows they have buses that come through from the City. It’s like they are not
thought of as a community. They have trailer homes to their left, a community business to their
right. It is a pathway for people to cut through with motorcycles or off-road vehicles. The other
night they witnessed a drug bust in the open area of the neighborhood. He feels giving them a
recreation area and picnic grounds would hoard a lot of outside people that come to use the
facilities. He knows that this recreation area would not be managed by the Police or any security
agency. He believes that a pool would at least allow some kind of management for people coming
and going. If they are left with an open area they will be dealing with the youth who have nothing
else to do but come there and hang out. He thinks that a managed pool would be something that
would allow some kind of regimentation of people that coming and leaving that property. A pool
would also be nice.
Chris Lindbloom – 35 Mer Way Dover DE 19901
Mr. Lindbloom stated that he feels opposite of what has been said so far. He is in agreement with
making this change. The main portion is that they have not progressed; there are issues with crime
from developments around them. As of right now, no one can say anything about promises that
have been maintained except from their current developer. The current developer said that the
homeowners would not have to pay from snow removal anymore and they have upheld their end of
the deal. This is what caused them to be in debt dramatically as an HOA. From the standpoint of
where the community center will be located compared to where the pool would be located is
another issue. The pool would be located at the narrowest wedge of the community in between
where the trailer park homes are and the walkway which is now a connection to North Little Creek
Road. By moving the community center to the opposite side of the development which would be
12
Paj 15
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
near the retirement home side, they would cut out the direct line of traffic that they have crossing
through the back end of the neighborhood. There would be a lighted building with very nice
landscaping and a lot more traffic to it from the community would help eliminate that pass through
from the other communities that they do not want walking through. As a total plan, the other
concern that they would run into with having a pool is the personal insurance that has to be paid for
as an HOA on that pool. If there were injuries caused from people that get into that pool that they
do not want in the pool at 2 AM due to not having a building there, not being very well lit, that
creates a long term liability to the homeowners of the community. He is in agreement that the
location should be moved. It will also help progress the buildings forward because there will an
actual amenity already there.
Clarence Richardson – 104 Nob Hill Road Dover DE 19901
Mr. Richardson stated that he feels if you have a building with light, who will take care of this
building? The building will have to be secured somehow. The community which is already hurting
because a lot of the promises made have never happened. He is sure that the new developer has
good intentions on the things he is saying but the fact remains that there are not a lot of people in
the community that can support what the developer plans to do. It seems to him that if more people
came to the meeting then maybe they could have this discussion and it could be timelier than what
they have now. Their main concerns are things that the previous builder did not handle. Another
main concern will be the security issues because they have had fires and Police chasing people
through the neighborhood. But because it is not the most secure area, a community center will still
need to be monitored. He has had things broken into before but believes that locks help honest
people stay honest. They do not do lot for people who really want to tear up something. This
Revised Plan seems to be more of a short term situation in which the developer is trying to promise
something that seems good. But in the long term, it will be more of a nuisance. The community
center will be something that none of the property owners really wanted and someone will have to
take care of it.
Linda Lushbaugh – 135 Lady Bug Drive Dover DE 19901
Mrs. Lushbaugh stated that she and her husband are property owners of a property in the
community. They have been property owners since 2008. She believes that what we have here are
promises that have been broken and angry people. They have lived in different states in medium
income developments with pools and they have done very well. These developments seem to
attract young families with children and the homes all of sudden become more desirable to those
types of people because there is something to do with the kids in pool areas. It does bring other
activities to the area for example swim clubs. They can see only good things and overall they
bought into the area with the pool being one of the major deciding factors. They are in favor of the
pool.
Mrs. Townshend stated that she would like to acknowledge three pieces of correspondence for the
record. There is an email with attachments from Kelly Harris who spoke tonight from 108 Nob Hill
Road. There are also emails from Wendy and Paul Waddell at 15 Mer Way and Mr. and Mrs.
Delroach at 110 Nob Hill Road. All of the emails are in favor of the swimming pool.
Mr. Tolbert closed the public hearing after seeing no one else wishing to speak.
Dr. Jones questioned if the developer was aware of all of the issues of the neighborhood? Responding
13
Paj 16
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
to Dr. Jones, Mr. Cohen stated yes, they were aware of the entire development plan.
Dr. Jones further questioned the words “development plan”, as in issues that have been brought to the
attention of this Commission tonight? Responding to Dr. Jones, Mr. Cohen stated yes.
Dr. Jones stated that Mr. Cohen indicated that his years of experience tell him that approximately 80%
of the development needs to be complete before the pool is properly supported. She questioned the
proper support for the community center. She further questioned if there was a possibility that there
would be additional assessments for the residents because of the community center versus a swimming
pool down the road? Responding to Dr. Jones, Mr. Cohen stated that it would be far less expensive.
The community center is built by the developer; there is no cost to the homeowners to build the
community center. The maintenance of the community center as time progresses is the primary cost to
the community. In terms of the long term one versus the other, the swimming pool can be used maybe
four (4) months a year in this climate and a community center can be used twelve (12) months a year.
Therefore, there is electricity, maintenance and basic cleaning that will have to occur twelve (12)
months a year. That cost is probably minimal compared to tens of thousands of dollars that have to be
put into a swimming pool. Pools do require a significant amount of maintenance as they age. They do
believe statistically that it is far less expensive to have a community center operational than a pool.
Dr. Jones questioned far less expensive to whom? Responding to Dr. Jones, Mr. Cohen stated that
once the pool is built or once the community center is built, it is basically the Homeowners
Association’s responsibility to maintain those items.
Dr. Jones questioned if this information had been communicated to the Homeowners Association in
terms of a projection? She further stated that it sounds like there had been very poor communication
prior to his time. She questioned has there been communication regarding this matter? Responding to
Dr. Jones, Mr. Cohen stated that he disagreed with that. There was a meeting held on February 11,
2013 where every single member of the community was invited. He believed that someone had
mentioned earlier in the night that only fifteen (15) out of the sixty (60) members of the community
were in attendance. From his seat, most of the people seemed to be fine with the Revised Plan. They
did not discuss specific budget matters but the issues that she had mentioned were all brought up.
Mr. Baldwin questioned that since the selling point of the residents who purchased homes was the
pool, is he amendable to having another meeting with the residents in order to get more of a
representation? Responding to Mr. Baldwin, Mr. Cohen stated that he did not know that it would do
any good. He did not know what more could be presented. They are dealing with something that
could be done today versus something that would be done years from now. People talk about having a
pool and they talk about issues in the overall community but he believes that the community would
have a lot more problems with the pool physically being there at this point in time than a community
center by leaps and bounds.
Mr. Baldwin further stated that Mr. Cohen commented that when the meeting was held, costs were not
reviewed. Responding to Mr. Baldwin, Mr. Cohen stated that they did review costs in general terms,
but a specific budget was not prepared. The developer was very direct as to the costs of the swimming
pool maintenance versus the community center maintenance. If the Planning Commission does not
approve the Revised Plan then the pool will stay there but it will not get built for years. They are the
successor developer; they inherited the plan, reviewed it and realized that it makes more sense. The
14
Paj 17
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
original plan did not show a pool, the original developers had a pool instituted as a second plan instead
of tennis courts. This revision would be the second revision of the plan. He sympathizes with the
people who bought homes from PCS Homes that were told otherwise, but they are not the original
developers they are the successor developers and their plan is to build the community center. They
believe that it will bring more people to the community. More people and more activity is better for
the community as a whole.
Mr. Holt questioned if a program could be set-up for the people who were in favor of the pool where
they could purchase memberships in order to off-set the cost of a pool? Also, maybe open up the pool
to outside people provided that they pay the membership fee as well? Responding to Mr. Holt, Mr.
Cohen stated that this process would not be allowed by the documents that are presently in place. This
would create a commercial use of the property. They would be dealing with the State of Delaware, a
private pool versus a public pool which creates other issues.
Mr. Holden stated that he appreciated Mr. Cohen’s efforts and he thought that his efforts were above
board in reaching out to the development to express his proposed path. What he has heard tonight is
eight (8) individuals in favor of waiting for a pool and one (1) in favor of going forward with the
community center. He would lean towards supporting the eight (8) individuals who want what they
view they were promised and that they do not mind waiting for. He did not hear anybody demand that
the pool had to happen today. He would be in favor of tabling the application if Mr. Cohen wanted to
reach out the community more. Maybe there were more people who really support having the
community center that the Planning Commission has not heard from. He is also sensitive to the other
issues that have been raised that are not things that they can address at this time such as the buffers on
lots and the crime. He strongly suggested to the community to reach out City Council or to the
Community Police. But the issue at hand today is that the residents are say that they will wait for the
pool.
Mr. Tolbert questioned how many members were on the Homeowner’s Association Board?
Responding to Mr. Tolbert, Mr. Cohen stated that they were four (4) members on the board at this
time.
Mr. Tolbert further questioned if the residents of the community pay a Homeowner’s Association fee?
Responding to Mr. Tolbert, Mr. Cohen stated yes.
Mr. Tolbert questioned if the pool was installed, would the Homeowner’s Association fees increase for
the residents? Responding to Mr. Tolbert, Mr. Cohen stated that the fees would increase dramatically.
If the pool had to be installed today, the fees would increase exponentially.
Mr. Tolbert further questioned if the residents were aware that the fees would increase? Responding to
Mr. Tolbert, Mr. Cohen stated that he believed that the residents were aware of this.
Mr. Tolbert questioned if this issue was addressed during the neighborhood meeting? Responding to
Mr. Tolbert, Mr. Cohen stated that the issue was addressed at the meeting.
Mr. Holden motioned to deny the request MI-13-04 Clearview Meadows PND: Revised Active
Recreation Plan and Minor Subdivision Plan due to the community being willing to wait until they
reach the critical mass necessary to support a pool, seconded by Mr. Baldwin and the motion carried
15
Paj 18
CITY OF DOVER PLANNING COMMISSION MARCH 18, 2013
by roll call vote 6-1 with Mr. Shomo, Mr. Baldwin, Mr. Holden, Ms. Still, Mr. Holt, and Mr. Tolbert
voting yes and with Dr. Jones voting against and Mr. Ambruso and Colonel Welsh absent.
Meeting adjourned at 8:34 PM
Sincerely,
Kristen Mullaney
Secretary
16
Paj 20
City of Dover
DATA SHEET FOR SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF April 3, 2013
PLANNING COMMISSION MEETING OF April 15, 2013
Plan Title: Lands of KGH Development Corporation at 625 South State
Street: Parking Lot Construction
S-13-05
Plan Type: Site Plan
Property Location: East side of South State Street
Property Addresses: 625 South State Street, 100 Scull Terrace, and 150 Scull Terrace
Tax Parcel: ED-05-077.12-01-51.00-000
Owner: KGH Development Corporation and Central DE Surgery Center
Present Zoning: IO (Institutional and Office Zone)
SWPOZ (Source Water Protection Overlay Zone)
Existing Uses: Existing Buildings as Offices, Surgery Center, and Day Care
Center with Parking Lots (96 existing parking spaces)
Proposed Uses: Same with Expansion of Parking Lots (Total to be 226 parking
spaces)
Site Area: 8.24 acres (359,134 S.F.)
Waivers Requested: Partial Elimination of Curbing
Consideration of Joint Parking Facilities
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Paj 21
City of
Dover
Planning
CITY OF DOVER Office
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C. MEETING DATE: April 3, 2013
APPLICATION: Lands of KGH Development Corporation at 625 South State Street: Parking
Lot Construction
FILE #: S-13-05 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Dawn Melson-Williams, AICP PHONE #: (302) 736-7196
PLAN SUMMARY:
This applications is for review of an Site Development Plan application for the expansion of the
existing parking lot for an additional 130 parking spaces located at 625 South State Street and 100
Scull Terrace. The property is zoned IO (Institutional and Office Zone) and a portion of the
property is subject to the SWPOZ (Source Water Protection Overlay Zone) Tier 1 – Wellhead
Protection Area and Tier 3 – Excellent Recharge Area. The property is located east side of South
State Street in the block between South Street and Hope Street. The owners of record are KGH
Development Corporation and Central DE Surgery Center. Addresses: 625 South State Street, 100
Scull Terrace, and 150 Scull Terrace. Tax Parcel: ED-05-077.13-01-51.00-000. Council District 2.
This project requires Site Plan Review due to the amount of additional impervious surface
coverage.
Located on this property is two story building originally constructed as a mansion house now
utilized as offices. The building is known as Greenwold (K-126) and also known as the Manlove
Hayes House (original owner) and Scull Mansion (20th century property owner). It is listed on
the National Register of Historic Places. Constructed circa 1864 the house and its property
included other outbuildings, a front carriage drive, and a planned landscape design.
PROJECT PROPOSAL (Drawings dated 3/1/2013):
The application proposes construction of several parking lot areas on the property at 625 South
State Street. The existing parking lot located between the existing two story office building
(mansion house) and the one story Outpatient Surgery Center will be expanded to the west. The
existing gravel area south of the mansion house is proposed as an eleven space paved parking lot.
The existing gravel drive just west of the mansion house and the gravel area to the north of the
mansion house are proposed to become a seven-four (74) space parking lot. It is noted that a
small parking area existed previously north of the mansion house; however, aerial photographs
show that between 2007 and 2012 this gravel area was greatly expanded into previous lawn areas
(without approval) and a driveway connection made to the adjacent property at 605 South State
Street. The applicant indicates that the gravel area north of the mansion house was expanded as
part of the construction parking and staging area for the recent building expansion projects at the
Paj 22
S-13-05 Lands of KGH Development Corporation at 625 South State Street: Parking Lot Expansion
DAC Report of April 3, 2013
Page 2
Bayhealth Medical Center. The project plans show some information on stormwater
improvements in the northeastern area of the site and new tree plantings.
Previous Review of Master Plan S-06-14 Bayhealth Medical Center:
While this specific property was not included in the Master Plan, a Master Plan was completed
for the main campus area of the Bayhealth Medical Center at 640 South State Street. The project
area for the Bayhealth Medical Center Master Plan consisted of multiple parcels of land located
between South State Street and South Governors Avenue in the vicinity of South Street and
Hope Street. It did not include this subject parcel at 625 South State Street. (Note: This property
was later included in a Unified Comprehensive Signage Plan for the Bayhealth Medical Center
facilities.)
The Bayhealth Medical Center Kent Campus Master Plan (S-06-14) was approved under the Site
Development Master Plan process in June 2006 with a one year extension to the project in May
2007. The Site Development Master Plan process allows for a series of construction phases to be
outlined in a Master Plan for Planning Commission review and approval. Revisions to the Master
Plan approved in September 2007 related to a Pedestrian & Utility Bridge over South Street
rather than a tunnel as first proposed. The phases of the project were given as follows:
Phase 1: Central Services Building
Phase 2: Podium Building, Parking Garage, and Pedestrian & Utility Bridge
Phase 3: South Street Parking Lot improvements
Phase 4: seven story Bed Tower Building Addition and north Parking Garage
Prior to each Phase of construction a Site Plan specific to that phase is submitted for
Administrative Site Plan review. After some revisions to the construction sequencing the
following phases have been completed: S-08-20 Phase 1- Podium Building and Parking Garage
and S-08-42 Phase 2A – Central Services Building and Pedestrian & Utility Bridge.
Administrative Site Plan review was completed in August 2009 for S-09-02 Phase 2B – South
Street Parking Lot Improvements; however, this aspect of the project has not commenced.
PARKING SUMMARY
The proposed northwestern parking lot expansion will result in parking between the building and
the street; however, the parking lot is located over one hundred (100) feet back from the street
and is therefore permitted to be located there. This is exception is granted in the IO zoning
district provisions (Zoning Ordinance, Article 3 §10.31).
The following parking information is provided for the subject property at 625 South State Street:
The parking requirements for a property in the IO zone is one parking space per 300 S.F. of floor
area or one per employee, whichever is greater. The Day Care Center requires parking at a rate
of one parking space per adult attendant and one parking space per ten (10) children.
Based on the size of the office buildings and surgery center building totaling at least 14,904 S.F.
resulting in a total of at least fifty (50) parking spaces would be required for these buildings* on
the project site (*Note: The overall square footage for the two story office buildings is unclear on
the plan. The building being demolished and storage pole building are not included in square
footage calculation.). Based on nineteen (19) attendants and seventy-eight (78) children, the Day
Care Building requires twenty-seven (27) parking spaces. Therefore, overall the subject property
requires at least seventy-seven (77) parking spaces and would be permitted to have at least
ninety-six (96) parking spaces under the maximum parking provisions of Zoning Ordinance,
Paj 23
S-13-05 Lands of KGH Development Corporation at 625 South State Street: Parking Lot Expansion
DAC Report of April 3, 2013
Page 3
Article 6 §3.11. With clarification of the total square footage for each building, the parking
requirement for the subject site can be set. As currently presented the subject property is
proposing a total of two hundred twenty-six (226) parking spaces which exceeds the maximum
allowed parking.
Consideration of Joint Facilities for Parking
While the total number of parking spaces proposed on the site at 625 South State Street exceeds
the maximum parking limitation, the applicant has indicated they are seeking to consider the
overall parking provided for the Bayhealth Medical Center properties. The Zoning Ordinance
includes provisions for considerations of parking to jointly serve multiple establishments.
Article 6 Section 3.7 Joint facilities. Required parking spaces, open or enclosed, may be provided
in spaces designed to serve, jointly, two or more establishments, whether or not located on the
same lot, provided that the number of required spaces in such joint facilities shall be not less than
the total required for all such establishments.
Bayhealth Medical Center Campus Parking Summary:
The minimum off street parking requirement for hospital use is based on one (1) space per every
three (3) beds in the facility (Article 6 § 3.1). The IO zoning district parking requirements are
governed by either square footage or employee count. Previous projects implemented on the
Bayhealth Medical Center campus with the recent capital improvement project included
construction of a parking garage, new surface parking lots, and improvements to existing parking
lots. At the time of the Master Plan review for the Bayhealth Medical Center in 2006, the Zoning
Ordinance did not include a maximum parking space limitation.
The applicant provided a Parking Exhibit Plan (4/2/12) to the Planning Office showing the locations
of the campus buildings and associated parking facilities in order to utilize the provisions for joint
facilities parking. The Bayhealth Medical Center main campus area was identified to include the
Hospital building and Parking Garage between South State Street and South Governors Avenue; the
Hope Street Parking Lot; the Central Services Building, office building and the South Street
Parking Lot; the office buildings at 540, 560, and 600 South Governors Avenue; the Gates property
at 605 South State Street, and the subject site at 625 South State Street. See Chart of Existing
Parking Facilities (Information from Parking Exhibit Plan).
Existing Parking Facilities at Bayhealth Medical Center campus
Location Address Number of Parking Spaces
Scull Property 625 South State Street 141
Gates Property 605 South State Street 9
Bayhealth Hospital (main 640 South State Street 12 at Frear House
building) 8 at front entrance
371 in Parking Garage
17 Emergency Room
84 Staff Parking Lot
North of South Street Governors Avenue 26 at Office Building
56 at Central Service Building
401 South Street Parking Lot
Hope Street Parking Lot Southeast corner of Hope Street and 157
South Governors Avenue
Human Resources Office 600 South Governors Avenue 49
Medical Office Buildings 540 & 560 South Governors Avenue 184
Paj 24
S-13-05 Lands of KGH Development Corporation at 625 South State Street: Parking Lot Expansion
DAC Report of April 3, 2013
Page 4
Overall, a total of 1,515 parking spaces are available and the total number of employees is 2,052
employees. The parking requirement for the joint facilities would be based on the employee
count; thus, the project for parking lot expansion at 625 South State Street contributes towards
the overall parking requirement for the facility.
Bicycle Parking
The project is required to provide bicycle parking. The bicycle parking calculation is one for
every twenty parking spaces. Based on the total of 226 parking spaces on this parcel, twelve
(12) bicycle parking spaces are required. The plan does not depict bicycle parking locations for
the property.
Waiver Requested: Partial Elimination of Curbing
Article 6 §3.6(b) requires upright curbing for all parking areas. The proposed parking lot does not
incorporate curbing in the following areas: east and southeast sides of the front expanding
parking lot, and the parking lot south of the mansion house office building. A written waiver
request for the elimination of curbing in these areas was submitted to the Planning Office for
consideration by the Planning Commission citing the reasons of existing conditions and the
management of water runoff. See attached waiver request.
SITE CONSIDERATIONS
Access
The property is access by an entrance drive from South State Street. For addressing purposes,
this entrance drive is named Scull Terrace. The entrance drive is shared with the Holy Cross
Church and School Complex. This shared entrance drive was created in the late 1980’s and is
referenced in an Easement Agreement dated January 30, 1987 (Deed Book 47 Page 63). (Also
referenced in development activities for property with Application C-90-1 KGH Surgery Center
& Diagnostic Center and C-90-12 KGH Paramedic Training Center.)
SWPOZ (Source Water Protection Overlay Zone)
Portions of the site are located within the SWPOZ (Tier 3: Excellent Recharge Area and Tier 1:
Secondary Wellhead Protection Area) found in Article 3 Section 29.7 of the Zoning Ordinance.
However, this project site is within the downtown redevelopment target area which is exempted
from the SWPOZ requirements and restrictions as per Zoning Ordinance, Article 3 §29.79 for the
Tier 3 area. The area subject to the Tier 1 requirements does not appear to be located within the
project area for the new parking lot expansion.
Sidewalks
The project site has an existing sidewalk along the South State Street frontage. The sidewalk
must include the appropriate accessibility ramps and crosswalk markings at the intersection with
the entrance drive. There are a narrow concrete path crossing the northern portion of the front
lawn to the street and a stone path crossing the southern area of the front lawn to the street.
Lighting
The parking lot project does identify additional site lighting in the areas of expansion. However,
the type of lighting fixture that will be used needs to be shown on the plan. The proposed
lighting must be adequate to safely light all parking and pedestrian areas yet must be shielded
and directed as to not create a nuisance on the adjacent properties.
Paj 25
S-13-05 Lands of KGH Development Corporation at 625 South State Street: Parking Lot Expansion
DAC Report of April 3, 2013
Page 5
TREE PLANTING AND LANDSCAPE PLAN
The submitted plan presents information on the existing trees on the property and the proposal
for new tree plantings. Portions of the property are existing woodland that are shown to remain.
Based on the total non-woodland area of 278,779 S.F., a total of ninety-three (93) trees are
required. The plan lists seventy-three (73) existing trees to remain on the property and the
planting of twenty (20) new trees thus meeting the requirement. A number of existing trees to the
north and east of the mansion house building will be removed to accommodate the parking for
the site. The new tree plantings are prosed on the west edge of the front parking lot area and to
the southeast of the mansion house adjacent to the expanded parking lot. The plantings include
ornamental trees such as Crabapple and Crape Myrtle trees, Eastern Red Spruce trees and Winter
King Hawthorns.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S
AUTHORITY AND AREA OF EXPERTISE.
CITY AND STATE CODE REQUIREMENTS:
1) The Site Plan must reflect any changes recommended by the Planning Commission.
2) Upright curbing shall be provided in accordance with the Zoning Ordinance unless a waiver
is granted by the Planning Commission. A written waiver request was submitted for the
elimination of a portion of the curbing for consideration by the Planning Commission.
3) This application seeks to utilize the joint facilities parking provisions of Zoning Ordinance,
Article 6 Section 3 for the subject site at 625 South State Street and the Bayhealth Medical
Center campus. Information on the required parking for the hospital facilities and the existing
parking conditions on the campus was provided for review.
4) Sheet C-001:
a) The data column needs to be updated prior to Final Approval. Some of the items which
need revising are as follows:
i) Indicate the zoning SWPOZ (Source Water Protection Overlay Zone) Tier 3 and Tier
1 under the zoning for the site.
ii) Add maximum lot coverage limitation of 85%.
iii) Update Item #15 for the floor area calculation to list the total floor area (excluding the
building to be demolished, the pole building used for storage, and the day care center)
and the appropriate parking calculation. The Day Care Building floor area cannot be
counted in this tally as it has a specific parking calculation based on its use.
iv) Check number of parking spaces provided. The plan drawing shows 226 spaces.
v) Add note listing the SWPOZ exemption for Tier 3 for this property.
vi) Add note with SWPOZ requirements for the Tier 1 areas.
vii) Clarify and add information regarding the joint facilities for parking including the
subject area, total number of parking spaces available (currently and proposed), total
number of employees, etc.
viii) Add a note to the Plan to provide information on any waivers granted by the
Planning Commission.
Paj 26
S-13-05 Lands of KGH Development Corporation at 625 South State Street: Parking Lot Expansion
DAC Report of April 3, 2013
Page 6
5) Show location of the Flood Plain areas that impact the property.
6) Show dimension of distance from parking lot to street in reference to the IO zoning district
off-street parking requirements.
7) Add information on the easement regarding the shared entrance drive.
8) The plan does not show the location of existing utilities (water, sewer, stormwater, etc.). This
information will be necessary to determine conflicts with proposed tree planting locations
and other site improvements.
9) Sheet C-101: Provide reference to tree protection measures and identify locations on the
Demolition Plan.
10) Show location of existing Dumpsters that serve the property. Construction of Dumpster
enclosures or other screening mechanisms may be required.
11) Sheet C-201:
a) Clarify the total floor area square footage for each building. It is unclear if the label of
each building is the building footprint area or total floor area. Also update the floor area
listings in any data columns.
b) Identify entrance locations to mansion house office building to ensure appropriate access
is in place from the parking lot.
c) Connect existing path along existing landscape wall on south side of mansion house
building to the parking lot.
d) Add sidewalk connection between the two parking lot areas in the area east of the
mansion house building.
e) Show location of parking bumpers (existing and proposed).
f) Identify the location of any traffic control signage for the parking lots.
12) Add construction details for items such as curbing, parking bumpers, traffic control signage,
light fixtures, etc.
13) The following information must be provided on the plan as related to Landscape Plan in
accordance with the plan requirements as listed in Zoning Ordinance, Article 5 §16.8:
a) Provide list of existing trees to remain.
b) Add planting detail for evergreen tree.
c) Update listing of zoning per Site Plan comments.
d) Check number of existing trees to be retained. Trees must be located on this parcel to be
counted.
e) Revise tree type proposed as two Eastern Red Spruces directly west of the mansion house
as these plantings will block the view of the historic mansion building from South State
Street.
14) Add connecting sidewalk from new parking lot area to sidewalk stub at the Holy Cross
entrance.
Paj 27
S-13-05 Lands of KGH Development Corporation at 625 South State Street: Parking Lot Expansion
DAC Report of April 3, 2013
Page 7
15) Evaluate the pavement conditions of the entrance drive. Improvements may be necessary to
paving, parking bumpers, and curbing and pavement markings including updating the
crosswalks to the piano key style striping.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
1) Waiver Request: The following is the Staff recommendation regarding the waiver
request.
a. Partial Elimination of Curbing: Staff recommends approval of the request to
eliminate the curbing for the parking lot for areas necessary for stormwater
management. The locations of such eliminations of curbing may be refined during
the design process. Parking bumpers are recommended at the head of all parking
spaces where the upright curbing has been eliminated.
2) The plan provides limited information on the projects’ strategy for stormwater
management. There are known drainage issues along the southern property line with
Holy Cross Church and School complex. This project must not increase the drainage
issues in that area and it is recommended that improvements be made in that area to help
resolve drainage issues.
3) Staff recommends installation of shrub/hedge planting along the South State Street side
of western parking lots as a screening for the vehicles in the parking lot. This will help
mitigate the effects of adding the parking lot into the landscape area surrounding the
historic mansion house (now offices) and character of the area. At the neighboring church
property a landscaped hedge screens the parking lot from the street.
4) Staff recommends implementation of a new pedestrian sidewalk system leading from the
parking lot expansion area along the north side of the entrance drive leading to the
pedestrian crosswalks at the entrance drive and designated crossing area of South State
Street. The stone path and the narrow concrete path are not constructed as accessible
routes. Appropriate pedestrian connections to other hospital facilities not located on the
subject site is a key element in the consideration of this expanded parking lot to serve
multiple hospital facilities under the provisions of the joint parking facilities.
5) Staff recommends that light fixtures places in the vicinity of the mansion house building
fit the character of the historic structure.
6) Since the property is listed on the National Register of Historic Places, documentation of
the outbuilding (646 S.F. two story office building) is recommended prior its demolition.
It appears to be one of the remaining outbuildings (accessory structures) previously
associated with the mansion house. Documentation of the building would include
photographs and information on the building’s construction.
ADVISORY COMMENTS TO THE APPLICANT:
1) The Planning Commission will act upon waiver requests as part of any motion to approve
this project, or as a separate motion if necessary. Note: All waivers are at the discretion of
the Planning Commission. The Commission may approve or deny waiver requests.
Paj 28
S-13-05 Lands of KGH Development Corporation at 625 South State Street: Parking Lot Expansion
DAC Report of April 3, 2013
Page 8
2) Other agencies and departments which participate in the Development Advisory Committee
may provide additional comments related to their areas of expertise and code requirements.
3) In the event, that major changes and revisions to the Site Plan occur in the finalization of the
Site Plan contact the Department of Planning and Inspections. These changes may require
resubmittal for review by the Development Advisory Committee, Planning Commission, or
other commissions making recommendations in regards to the plan.
4) Construction will have an effect on the adjacent property owners and nearby streets and site
access. Any work requiring the closing or rerouting of owners or visitors to the adjacent
properties, streets, and site access shall be coordinated with the Planning Office and other
City Staff as to offer the least amount of inconvenience.
5) The applicant/developer shall be aware that prior to any ground disturbing activities on the
site the appropriate site inspections and permits are required.
6) As the property is listed on the National Register of Historic Places (known as Greenwold
and Manlove Hayes House), any projects involving federal funds are subject to the Section
106 process of the National Historic Preservation Act.
7) The applicant should be aware of the potential for historic archaeological resources which
may include previous building locations, wells, privies, etc. on the property to the rear of the
mansion house. The State Division of Historical & Cultural Affairs can provide technical
assistance when dealing with archaeological resources including previous studies at the
subject properties.
8) The applicant shall be aware that Site Plan approval does not represent a Building Permit,
Demolition Permit, and associated construction activity permits. A Building Permit will be
utilized as a tracking mechanism for the site improvements of the parking lot. A Demolition
Permit is required to demolish the small office building. A separate application process is
required for issuance of a Building Permit from the City of Dover.
9) The applicant shall be aware that Site Plan approval does not represent a Sign Permit, nor
does it convey permission to place any sign on the premises. Certain types of signage require
a Sign Permit from the City of Dover prior to placement of any such sign; please consult with
Planning Staff in regards to signage.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Paj 29
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MARCH 27, 2013
APPLICATION: Lands of KGH Development Corporation
FILE #: S-13-05
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Steve Enss - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Electric - 302-736-7070 Public Works – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
2. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
3. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
4. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
WATER / WASTEWATER / STREETS / GROUNDS / SANITATION
1. None.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from Kent Conservation District is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and
practices. This must be included as a note on the plan.
2. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2004 (.dwg format).
b. Adobe Reader (.pdf format).
Paj 30
Lands of KGH Development Center
File #: S-13-05
March 27, 2013
Page 2 of 2
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER / WASTEWATER / STORMWATER / STREETS / SANITATION / GROUNDS / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC / WATER / WASTEWATER / STORMWATER / STREETS / SANITATION / GROUNDS / GENERAL
1. None
SANITATION
1. Please depict the location of the current dumpster(s) / trash container(s) that is being serviced by the City of Dover,
further comments may follow.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Paj 31
C F
I I
CITY OF DOVER T R
Y E
DEVELOPMENT ADVISORY COMMITTEE
O M
APPLICATION REVIEW COMMENTARY F A
R
D.A.C. MEETING DATE: D S
O H
V A
E L
R
APPLICATION: KGH 625 South State St. Scull Terrace Parking Lot
FILE #: S-13-05 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: David Truax, Fire Marshal PHONE #: (302) 736-7011
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY,
AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF
EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY
THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
Existing building is over 5000 sq. ft. and paved service will need to have fire lanes marked per
Delaware State Fire Prevention Regulations. Fire lane to pick up the front and north side of
building.
Project to be completed per approved Site Plan.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
After any application has been approved by the Planning Commission, the applicant has a
maximum of thirty (30) days to appeal to the Code Board of Appeals Committee.
All comments from this office, approved by the Planning Commission are at the expense of the
owner/applicant.
The proposed building will be reviewed under Business Occupancy.
Paj 32
The City of Dover uses the 2009 NFPA Life Safety Code, 2009 IBC, latest editions of all other
NFPA Codes and the 2009 Delaware State Fire Prevention Regulations.
The Dover Fire Department request that a 8 ½ X 11 copy of the floor plan and site plan be
submitted to Station 1, attention Fire Chief, prior to the Certificate of Occupancy being issued.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Paj 33
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: March 27, 2013 T
===============================================================
APPLICATION: Lands of KGH Development Corporations at 625 South State Street
FILE#: S-13-05 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. The department requires the applicant to provide proper forms, fees, and plans in
order to issue an entrance permit.
2. The applicant must provide ADA compliant curb ramps along the site frontage on
South State Street. In addition, the cross-walks at the existing entrance must be
removed and replaced with piano-key cross-walks.
3. A 10’wide permanent easement (PE) must be created along the site frontage to
accommodate the existing sidewalk and all future utility installations.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
If the proposed parking lot will serve any of the staff at the Bayhealth hospital, then the
developer will be required to perform a traffic study of the site entrance intersection to
determine whether a signalized pedestrian crossing is warranted at the entrance. When
the study is completed, DelDOT will review it and send its recommendations of the
improvements to the City. The improvements contained in the study will be implemented
by the developer per DelDOT's discretion. Please contact Ms. Naa-Astwei Tetteh at (302)
659-4097 or via e-mail at Naa-Atswei.Tetteh@state.de.us to obtain the scope of the
traffic study.
ADVISORY COMMENTS TO THE APPLICANT:
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Paj 34
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
April 2013
APPLICATION: KGH Development Corporation
FILE #: S-13-05
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: David C. Cahill PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH
THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE
ADDRESSED BY THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management plan must be
reviewed and approved by our office prior to any land disturbing activity (i.e. clearing, grubbing, filling, grading, etc.) taking
place. The review fee and a completed Application for a Detailed Plan are due at the time of plan submittal to our office.
Construction inspection fees based on developed area and stormwater facility maintenance inspection fees based on the number
of stormwater facilities are due prior to the start of construction. Please refer to the fee schedule for those amounts.
2. The following notes must appear on the record plan:
The Kent Conservation District reserves the right to enter private property for purposes of periodic site inspection.
The Kent Conservation District reserves the right to add, modify, of delete any erosion or sediment control
measure, as it deems necessary.
A clear statement of defined maintenance responsibility for stormwater management facilities must be provided on
the Record Plan.
3. A soils investigation supporting the stormwater management facility design is required to determine impacts of the seasonal high
groundwater level and soils for any basin design.
ADVISORY COMMENTS TO THE APPLICANT:
1. Green Technologies (bio retention, bio swales etc.) must be considered before traditional facilities can be considered.
a. The addition of parking typically allows for the introduction of green technologies to be implemented.
b. As a pre-treatment prior to entering the facility is also an effective use of bio swales, filter strips and/or bio retention.
2. The drainage patterns being shown on the plans do not appear to what was discussed in the pre application meeting. Some
drainage is being directed to the adjacent property (Holy Cross) there are known drainage issues in the area that the flows are
being directed.
3. The preferred methods of stormwater management are those practices that maximize the use of the natural features of a site,
promote recharge and minimize the reliance on structural components.
4. It is recommended that the stormwater management areas be incorporated into the overall landscape plan to enhance water
quality and to make the stormwater facility an attractive community amenity.
5. A letter of no objection to recordation will be provided once the detailed Sediment and Stormwater Management plan has been
approved.
6. Based on the site characteristics, a pre-application meeting will be required to discuss stormwater management and drainage for
this site.
Paj 36
City of Dover
DATA SHEET FOR SITE DEVELOPMENT PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF April 3, 2013
PLANNING COMMISSION MEETING April 15, 2013
Plan Title: US Gas
S-13-06
Plan Type: Site Development Plan
Applicant/Owner: US Gas, LLC
Project Engineer: Lane Engineering, LLC
Location: Southeast corner of North DuPont Highway and Townshend Boulevard
Address: 461 North DuPont Highway
Tax Parcel: ED-05-068.13-01-55.00-000
Site Area: 0.846 acres ± (36,852 SF ±)
Zoning: C-4 (Highway Commercial Zone)
Present Use: Automobile service station with gas pumps
Proposed Use: Automobile service station with gas pumps and with additional impervious
area
Proposed New Impervious Area: 6,861 SF
Sanitary Facilities: City of Dover
Water Supply: City of Dover
Waivers Requested: Reduction in Arterial Street Buffer
Partial Elimination of Curbing
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Paj 37
S-13-06 US Gas at 461 N. DuPont Hwy.
DAC Report for April 3, 2013
Page | 2
CITY OF DOVER City of
Dover
DEVELOPMENT ADVISORY COMMITTEE
Planning
APPLICATION REVIEW COMMENTARY Office
D.A.C. MEETING DATE: April 3, 2013
APPLICATION: US Gas at 461 North DuPont Highway
FILE #: S-13-06 REVIEWING AGENCY: City of Dover Planning Office
CONTACT PERSONS: Janelle M. Cornwell, AICP PHONE #: 302-736-7196
PLAN SUMMARY
This is a Site Development Plan Review to permit the addition of a 6,861 SF impervious area.
The site is an existing automobile service station with gas pumps. The property is zoned C-4
(Highway Commercial Zone). The property is located at the southeast corner of North DuPont
Highway and Townsend Boulevard. The owner of record is US Gas, LLC. Address is 641 North
DuPont Highway. Tax Parcel: ED-05-068.13-01-55.00-000.
The site has an active Code Enforcement Case (#12-1937) due to the placement of the
impervious surface without review and approval. The amount of impervious surface (9,644 SF)
placed on the property requires Site Plan approval by the Planning Commission. Zoning
Ordinance, Article 10 Section 2.11(B) states that site plans with a total of 5,000 SF or greater of
new or added impervious surfaces require Site Plan approval by the Planning Commission. A
portion of the unapproved impervious surface (3,418 SF) is proposed to be removed as part of
this application.
The use of the property as a motor vehicle service station shall conform with Article 3 Section
15.15 of the Zoning Ordinance. The storage of junk or dismantled vehicles or parts on the site is
prohibited.
Article 3 Section 15
15.15 Motor vehicle service stations, subject to the following regulations:
(a) The minimum lot size for such service stations shall be 20,000 square feet, and the
minimum street frontage shall be 150 feet.
(b) Entrance and exit driveways shall have an unrestricted width of not less than 16 feet,
shall be located not nearer than ten feet from any property line and shall be so laid out as
to avoid the necessity of any vehicle leaving the property to back out across any public
right-of-way or portion thereof.
(c) Vehicle lifts or pits, dismantled and disabled automobiles and all parts or supplies
shall be located within a building enclosed on all sides.
Paj 38
S-13-06 US Gas at 461 N. DuPont Hwy.
DAC Report for April 3, 2013
Page | 3
(d) All service or repair of motor vehicles, other than such minor servicing as change of
tires or sale of gasoline or oil, shall be conducted in a building fully enclosed on all sides.
This requirement shall not be construed to mean that the doors to any repair shop must
be kept closed at all times.
(e) The storage of gasoline or flammable oils in bulk shall be located fully underground in
accordance with applicable provisions of the National Fire Protection Association Code.
(f) No gasoline pumps shall be located nearer than 15 feet to any street line.
(g) No building permit for a motor vehicle service station shall be issued [for a station]
with a fuel dispenser system located closer than 100 feet from a property line of any
school, day care, church, hospital, nursing home, or place of public assembly designed
for the simultaneous use and occupancy by more than 100 persons.
PARKING SUMMARY
The minimum parking requirement for this project is one and a half (1½) parking spaces for 300
S.F. of floor area or one parking space per employee, whichever is greater. Based on the size of
the building of 1,680 S.F., a total of nine (9) parking spaces are required. The site is providing
nine (9) parking spaces. The site meets the parking requirement.
Bicycle Parking
The minimum bicycle parking is one (1) bike space for every twenty (20) parking spaces. Based
on the number of parking spaces at nine (9), a minimum of one (1) bicycle parking space is
required. The location of the bicycle parking is not identified on the plan.
SITE CONSIDERATIONS
Sidewalk
Sidewalk is required along all street frontages. Sidewalk exists along North DuPont Highway
and is proposed along Townsend Boulevard. There is a partial sidewalk connection into the site
at the corner of the property.
Loading Space
A loading space is not required based on the size of the building.
Dumpster
Based on the size of the building, one (1) dumpster pad and enclosure is required for the site. The
dumpster pad and enclosure are not shown on the plan. The dumpster enclosure material shall be
compatible with the architectural elements of the main building.
Waiver Requested: Partial Elimination of Curbing
The parking areas and access drives are required to be curbed (Article 6 §3.6). There is existing
curbing around the grass island at the corner of the site and near the south property line. The
plan is proposing the elimination of curbing for the rest of the site. There is no curbing along the
existing building. Parking bumpers will be provided at the head of the parking spaces. A written
waiver request for the partial elimination of curbing has been submitted to the Planning Office
for consideration by the Planning Commission.
Paj 39
S-13-06 US Gas at 461 N. DuPont Hwy.
DAC Report for April 3, 2013
Page | 4
Waiver Requested: Reduction in Arterial Street Buffer
North DuPont Highway (U.S Route 13) is considered as a principal arterial and requires a thirty (30)
foot landscape buffer along the road frontage known as an Arterial Street Buffer. The buffer is
measured from the edge of the right-of-way. This plan does not provide the required thirty (30) foot
landscape buffer along North DuPont Highway. The plan proposes a landscape buffer ranging from
none to fourteen (14) feet to a maximum of twenty-four (24) feet along North DuPont Highway. A
written waiver request for the reduction of up to sixteen (16) feet for the Arterial Street Buffer
has been submitted to the Planning Office for consideration by the Planning Commission.
TREE PLANTING AND LANDSCAPE PLAN
One (1) tree is required for every 3,000 SF of land area. The tree planting requirement is based
on the non-woodland land area. Based on the total size of the parcel (of the total non-woodland
area) at 36,852 SF, a total of thirteen (13) trees are required. The plan indicates that there are
twenty-six (26) proposed trees to be planted on the site. Five (5) of the proposed trees are
planted within the Arterial Street Buffer and shall not count towards the overall tree planting
requirement. The trees include a mixture of deciduous and evergreen trees. The trees are located
throughout the site with concentrations along the property lines. The plan meets the tree planting
requirement.
The property is zoned C-4 and requires a ten (10) foot landscape strip along the street lines. This
landscaped area is provided on the site along a portion of North DuPont Highway and Townsend
Boulevard. The trees planted within the landscape area along Townsend Boulevard may count
towards the tree planting requirement.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S
AUTHORITY AND AREA OF EXPERTISE.
CITY AND STATE CODE REQUIREMENTS:
1) The Arterial Street Buffer shall be constructed in accordance to the Zoning Ordinance
unless a waiver is granted by the Planning Commission. A written waiver for the
reduction of the Arterial Street Buffer has been submitted to the Planning Office for
consideration by the Planning Commission.
2) Curbing shall be constructed in accordance to the Zoning Ordinance unless a waiver is
granted by the Planning Commission. A written waiver for a partial elimination of
curbing to allow for drainage into the stormwater management area has been
submitted to the Planning Office o for consideration by the Planning Commission.
3) Provide the following items in the Data Column:
a) Indicate the size of the existing building.
b) Indicate the number of required and provided bicycle parking spaces.
c) Indicate the amount of new impervious surface.
d) Indicate the amount of new impervious surface to remain.
Paj 40
S-13-06 US Gas at 461 N. DuPont Hwy.
DAC Report for April 3, 2013
Page | 5
e) Indicate if the property is located within the floodplain and referenced FIRM map.
f) Provide a note stating that the use as a motor vehicle service station shall comply with
Article 3 Section 15.15 and there shall be no storage of junk or dismantled vehicles or
parts on the site.
g) Provide a note stating that the property is legal non-conforming with regards to the 100
foot setback from the property line of a church and that the gas pumps along North
DuPont Highway may be within 15 feet of the property line.
4) Indicate the location of the bicycle parking on the Site Plan, Grading Plan, and Landscape
Plan Sheets.
5) Show the setbacks on the Grading Plan Sheet.
6) Provide a full sidewalk connection into the site. This can be an extension of the existing
partial sidewalk connection into the site at the corner of the property or elsewhere on the
property.
7) Ensure barrier free access for the sidewalks on the site.
8) Indicate the full tax parcel number on the adjacent parcels of land on all Plan Sheets.
9) Indicate the zoning on the adjacent parcels of land on all Plan Sheets.
10) Indicate the full tax parcel number for the site on all Plan Sheets.
11) Provide the location of the dumpster pad and enclosure on the Site Plan.
12) Indicate the location of the existing utilities on all Plan Sheets.
13) Provide one (1) handicap parking space on all Plan Sheets.
14) Provide information as to the stability and strength of the impervious surface area to remain.
The impervious area shall comply with the standard paving detail and standards or the area
shall be paved.
15) The Plan Data Column will need to be updated prior to Final Approval with the following:
a) Any changes recommended or approvals including any waivers granted by the Planning
Commission.
16) Provide construction details for the following items but not limited to: barrier free sidewalk,
dumpster enclosures, dumpster pad, curbing, parking bumpers, paving section, lighting
fixtures, fence (maximum height 4 ft. in front yard and 8 ft. in side and rear yards), handicap
signage, bicycle parking, etc.
17) Revise the following items on the Landscape Plan Sheet:
a) Provide a Tree List on the sheet.
Paj 41
S-13-06 US Gas at 461 N. DuPont Hwy.
DAC Report for April 3, 2013
Page | 6
b) Identify the exact type of trees to be planted on the site in the Tree List.
c) Identify the exact number of the specific types of trees to be planted in the Tree List.
d) Identify the exact type of shrubs to be planted on the site in the Tree List.
e) Identify the exact number of the specific types of shrubs to be planted in the Tree List.
f) Provide a Landscape Architect, Architect, or Certified Nursery Professional Certification.
18) A City of Dover Business License is required for each engineer, architect, professional land
surveyor, or landscape architect doing business within the City. The City of Dover Business
License application can be found on the city’s website, www.cityofdover.com. A City of
Dover Business License for each engineer, architect, or professional surveyor shall be
obtained prior to Final Site Plan Approval. Please contact the Planning and Inspections
Department at 302-736-7010 with any questions.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
1) Waivers Requested: The following is Staff recommendation regarding the waivers requested.
a) Partial Elimination of Arterial Street Buffer: Staff recommends approval for the
reduction in the Arterial Street Buffer. Staff notes that there is a small buffer located at
the corner of N. DuPont Hwy. and Townsend Blvd and there is a large entrance along N.
DuPont Hwy. limiting the area of the Arterial Street Buffer. The may be the potential for
expansion of the buffer based comments from DelDOT.
b) Partial Elimination of Curbing: Staff recommends approval for the partial elimination of
curbing. Staff notes there are areas on the site that do not have curbing. The new
impervious area is proposing drainage into the stormwater management area. Parking
bumpers will be installed at the end of the parking spaces and a fence will be located
around the new impervious area.
ADVISORY COMMENTS TO THE APPLICANT:
1) The Planning Commission should act upon the waiver requests for the project as part of
any motion to approve this project, or as a separate motion if necessary. Note: All
waivers are at the discretion of the Planning Commission. The Commission may approve
or deny waiver requests
2) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise and code
requirements.
3) In the event, that major changes and revisions to the Site Development Plan occur in the
finalization of the Site Development Plan contact the Department of Planning and
Inspections. Examples include reorientation of buildings, relocation of site components
like stormwater management areas, and increases in floor area/unit count. These changes
may require resubmittal for review by the Development Advisory Committee, Planning
Commission, or other agencies and commissions making recommendations in regards to
the plan.
Paj 42
S-13-06 US Gas at 461 N. DuPont Hwy.
DAC Report for April 3, 2013
Page | 7
4) Following Planning Commission approval of the Site Development Plan, the Plan must
be revised to meet all conditions of approval from the Development Advisory Committee
or as otherwise noted. A Check Print must be submitted for review by Planning Office
Staff and the other commenting agencies. Upon determination that the Plan is complete
and all agency approvals have been received, copies of the Plan may be submitted for
final endorsement.
5) Construction may have an effect on the adjacent property owners and nearby travel lanes.
Any work requiring the closing or rerouting of potential customers, residents, or visitors
to adjacent properties should be coordinated as to offer the least amount of inconvenience
to the adjacent property owners.
6) The applicant shall be aware that Site Development Plan approval does not represent a
Sign Permit, nor does it convey permission to place any sign on the premises. Any
proposed site or building identification sign shall require a Sign Permit from the City of
Dover prior to placement of any such sign.
7) The applicant shall be aware that Site Development Plan approval does not represent a
Building Permit and associated construction activity permits. A separate application
process is required for issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Paj 43
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: MARCH 27, 2013
APPLICATION: US Gas at 451 N. Dupont Highway
FILE #: S-13-06
REVIEWING AGENCY: City of Dover Electric and Public Works Departments
CONTACT PERSON: Steve Enss - Electric
Jason A. Lyon, P.E. – Public Works
CONTACT PHONE #: Electric - 302-736-7070 Public Works – 302-736-7025
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
2. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer
may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the
owner’s expense.
3. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
4. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
WATER
1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22,
2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the
project.
b. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Department of Public Works specifications and requirements.
c. The site contractor shall contact the City of Dover Public Works Construction Manager at (302) 736-7025 prior to
the start of construction. A representative from the City of Dover Department of Public Works must observe and
approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted
in the field due to conditions of the existing main. Possible conditions that would require tapping relocation
include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test
holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be
held responsible for field conditions requiring adjustment of the tapping location or for any work required by the
contractor to make an appropriate and lawful connection.
3. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
Paj 44
US Gas at 461 N. Dupont Hwy.
File #: S-13-06
March 27, 2013
Page 2 of 4
4. Per the Water / Wastewater Handbook, minimum eighteen-inches (18”) of separation shall be provided for all water
services from all storm sewer infrastructure.
WASTEWATER
1. All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date
March 22, 2010. Please contact our office for more information.
2. The following notes must be added to the plans:
a. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the
mains in accordance with the City of Dover Department of Public Works specifications and requirements.
b. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall
discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff,
subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any
sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as
“…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes,
exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no
illegal discharges to the sanitary sewer system are created with the site improvements.
3. Per the Water / Wastewater Handbook, minimum eighteen-inches (18”) of separation shall be provided for all
wastewater services from all storm sewer infrastructure.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from Kent Conservation District is submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
STREETS
1. Final site plan approval will not be granted until either a copy of the approved entrance plan or a letter of no objection,
signed by DelDOT is submitted to our office.
GROUNDS / SANITATION
1. None.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and
practices. This must be included as a note on the plan.
2. The final site plan must be submitted in the following compatible digital formats:
a. AutoCAD 2004 (.dwg format).
b. Adobe Reader (.pdf format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER
1. The current design for this site includes a stormwater management area that is directly above the existing water
service to the building in question. Currently, the backflow prevention is downstream of the location of the proposed
pond. The current orientation increases the chance of contamination to the water service, since the backflow
preventer is not located to the north of the pond the water distribution system is subject to contamination. Staff
requests that the water line be designed to eliminate all conflict from the proposed pond. The relocation of the water
Paj 45
US Gas at 461 N. Dupont Hwy.
File #: S-13-06
March 27, 2013
Page 3 of 4
service would define the project as a renovation to water infrastructure, which would require the project to bring the
component of water service to be changed up to current standards and specifications. This includes, but is not limited
to the following:
a. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly
determine the size of the domestic and irrigation (if applicable) water meter for the proposed building. These
projections must be submitted prior to approval so the meter size can be placed on the final site plan. The
proposed water meter must be installed in a pit, in a non-traffic bearing location (which includes vehicular, bicycle
and pedestrian traffic). Also, a dual check valve is required downstream of the meter.
b. Curb stops shall be installed one foot (1’) outside of the right-of-way or easement line for each lot, in a non-traffic
bearing location.
c. The minimum size of all water service lines shall be one-inch (1”).
WASTEWATER
1. The current design for this site includes a stormwater management area that is directly above the existing wastewater
lateral to the building in question. The current orientation increases the likelihood of infiltration to the wastewater
lateral, which would subsequently enter the wastewater sewer system, causing unneeded treatment costs from the
Kent County Wastewater Treatment Plant. Staff requests that the wastewater lateral be designed to eliminate all
conflict from the proposed pond. The relocation of the wastewater lateral would define the project as a renovation to
wastwater infrastructure, which would require the project to bring the component of wastewater lateral to be changed
up to current standards and specifications. This includes, but is not limited to the following:
a. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines.
Rim and invert elevations must be labeled on all sanitary structures, including cleanouts.
b. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of
the right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a
heavy duty cast iron frame and cover to prevent damage to the cleanout and lateral.
c. Sizing (flow) calculations must be submitted for all sanitary sewer laterals (other than for single-family dwellings)
showing that velocity and all other requirements are met.
d. The minimum size of all sanitary sewer laterals shall be six-inch (6”).
STORMWATER / STREETS / SANITATION / GROUNDS / GENERAL
1. None
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. None
WATER
1. The City of Dover water system is available to this site. The developer is responsible for all costs associated with
extending and providing service to the proposed project.
2. Prior to plan approval, the water system plans may need to be submitted to the Division of Public Health, Office of
Drinking Water for review and approval. The owner/developer will be responsible for providing all completed forms
and plan sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be
submitted to the Office of Drinking Water until review has been completed by our office.
3. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of
Public Works directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the
site.
WASTEWATER
1. The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated
with extending and providing service and capacity to the proposed project.
Paj 46
US Gas at 461 N. Dupont Hwy.
File #: S-13-06
March 27, 2013
Page 4 of 4
2. Prior to plan approval, the sanitary sewer system plans may need to be submitted to the DNREC, Division of Water
Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible for
providing all application fees, completed forms and plan sets directly to DNREC.
STORMWATER / STREETS / GROUNDS
1. None.
SANITATION
1. Please depict the location of the current dumpster(s) that is being serviced by the City of Dover, further comments
may follow.
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be
abandoned, flowable fill may be required.
2. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial
Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team-
logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Paj 47
C F
I I
CITY OF DOVER T R
Y E
DEVELOPMENT ADVISORY COMMITTEE
O M
APPLICATION REVIEW COMMENTARY F A
R
D.A.C. MEETING DATE: D S
O H
V A
E L
R
APPLICATION: US Gas 461 North DuPont Highway
FILE #: S-13-06 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: David Truax, Fire Marshal PHONE #: (302) 736-7011
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY,
AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF
EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY
THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
If used for vehicle storage a Knox Box is required for fire department entry.
Project to be completed per approved Site Plan.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
After any application has been approved by the Planning Commission, the applicant has a
maximum of thirty (30) days to appeal to the Code Board of Appeals Committee.
All comments from this office, approved by the Planning Commission are at the expense of the
owner/applicant.
The proposed building will be reviewed under Occupancy.
The City of Dover uses the 2009 NFPA Life Safety Code, 2009 IBC, latest editions of all other
NFPA Codes and the 2009 Delaware State Fire Prevention Regulations.
Paj 48
The Dover Fire Department request that a 8 ½ X 11 copy of the floor plan and site plan be
submitted to Station 1, attention Fire Chief, prior to the Certificate of Occupancy being issued.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Paj 49
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: March 27, 2013 T
===============================================================
APPLICATION: US Gas at 461 North DuPont Highway
FILE#: S-13-06 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. The department requires the applicant to provide proper forms, fees, and plans in
order to re-evaluate and issue an entrance permit.
2. The applicant must provide ADA compliant curb ramps along at the existing
entrances along the site frontage on US Route 13 and Townsend Boulevard.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
Per the meeting that occurred between the applicant and the Department on June 7, 2011,
the existing entrances that are located within the functional area of the intersection US
Route 13 and Townsend Boulevard must be removed and relocated on Townsend
Boulevard. Also, the applicant was encouraged to seek a permanent easement (PE) from
the adjacent property in order to relocate the entrance away from the intersection.
ADVISORY COMMENTS TO THE APPLICANT:
• It is strongly recommended that the applicant meet and further discuss this
project with the Department.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Paj 50
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
April 2013
APPLICATION: US Gas @ 461 N. DuPont
FILE #: S-13-06
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: David C. Cahill PHONE #: 741-2600 ext.3
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH
THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE
ADDRESSED BY THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management plan must be
reviewed and approved by our office prior to any land disturbing activity (i.e. clearing, grubbing, filling, grading, etc.) taking
place. The review fee and a completed Application for a Detailed Plan are due at the time of plan submittal to our office.
Construction inspection fees based on developed area and stormwater facility maintenance inspection fees based on the number
of stormwater facilities are due prior to the start of construction. Please refer to the fee schedule for those amounts.
2. The following notes must appear on the record plan:
• The Kent Conservation District reserves the right to enter private property for purposes of periodic site inspection.
• The Kent Conservation District reserves the right to add, modify, of delete any erosion or sediment control
measure, as it deems necessary.
• A clear statement of defined maintenance responsibility for stormwater management facilities must be provided on
the Record Plan.
3. A soils investigation supporting the stormwater management facility design is required to determine impacts of the seasonal high
groundwater level and soils for any basin design.
ADVISORY COMMENTS TO THE APPLICANT:
1. When providing a report with the calculations for the site development the conditions that existed prior to the installation of the
milling must be used (grass conditions).
2. The proposed outfall structure is being shown within an existing storm drain system; this not a desirable design and may require
a pipe analysis to ensure no adverse drainage problems would develop.
3. Green Technologies (bio retention, bio swales etc.) must be considered before traditional facilities can be considered.
4. The plans show an outfall structure; however the type of facility (wet, dry or infiltration) has not been provided. The District
would be opposed to any facility that would not be esthetically pleasing (facilities that promote nuisance vegetations’)
5. The preferred methods of stormwater management are those practices that maximize the use of the natural features of a site,
promote recharge and minimize the reliance on structural components.
6. It is recommended that the stormwater management areas be incorporated into the overall landscape plan to enhance water
quality and to make the stormwater facility an attractive community amenity.
7. A letter of no objection to recordation will be provided once the detailed Sediment and Stormwater Management plan has been
approved.
8. Based on the site characteristics, a pre-application meeting will be required to discuss stormwater management and drainage for
this site.