UTILITY COMMITTEE
The Utility Committee Meeting was held on November 13, 2012 at 5:00 p.m. with
Councilwoman Williams presiding in the absence of Chairman Bonar. Members present were
Mr. Perza and Mr. Blakeman. Mr. Snaman was absent. Members of Council present were
Mr. Hutchison, Mr. Lynn (arrived at 5:08 p.m.), and Council President Leary (arrived at 5:05 p.m.).
Mayor Carey (arrived at 5:03 p.m.) was also present.
AGENDA ADDITIONS/DELETIONS
Mr. Blakeman moved for approval of the agenda as presented, seconded by Mr. Perza and
unanimously carried.
Water Quality and Inflow and Infiltration (I & I) Updates
Members were provided a presentation entitled “Water Quality Update,” (Attachment #1), a City
of Dover Water Quality Applicable Expenditures Report (Attachment #2), a City of Dover Inflow
and Infiltration Applicable Expenditures Report (Attachment #3), and a presentation entitled
“Inflow/Infiltration Update” (Attachment #4). Mrs. Duca reviewed the “Water Quality Update”
presentation (Attachment #1), providing background information on the origin of brown water issues
and explaining steps that have been taken to remedy the situation and find solutions. Referring to
the Water Quality Expenses and Complaints graph (Page 4 of the presentation) and the City of Dover
Water Quality Applicable Expenditures Report (Attachment #2), Mrs. Duca noted that the changes
that have been made have brought about significant improvement in terms of stabilizing the water
chemistry.
In response to Mrs. Williams inquiry regarding the function of the Wellhead Variable Frequency
Drive (VFD) Upgrade referenced in the presentation under “Production Capital Improvements,”
Mrs. Duca advised that the flow is primarily regulated by pumps rather than gravity, but the VFD
allows water to slowly “ramp up” into the system. The VFD controls how quickly water turns on
and the pace at which it flows, allowing for less disturbance in the mains.
Mrs. Duca reviewed the Distribution Capital Improvements portion of the presentation (Page 7),
identifying various methods that have been implemented to design a more structurally superior pipe
system, allowing for ease of locating the pipes at all times and minimizing reactions between the iron
and the pipes themselves. She explained the prioritization schedule for water main relining and/or
replacement projects to meet industry standards and address water quality concerns. Mrs. Duca
reviewed improvements that have been or are being made to address the problem, including upgrades
to the water main. She noted that future plans include replacing a minimum of one (1) mile of pipe
per year beginning in FY 2014, along with other operational improvements and monitoring plans.
She concluded this portion of her presentation by outlining the steps needed to move forward to meet
the desired improvement goals to the City’s water system, including long-term planning, securing
increased long term financial resources and staffing resources, and the utilization of consultants and
outside contractors to meet critical timeframes.
Paj 2
UTILITY COMMITTEE MEETING OF NOVEMBER 13, 2012 PAGE 2
Mrs. Duca stated that the City of Dover Inflow and Infiltration Applicable Expenditures Spreadsheet
(Attachment #3) was created approximately six (6) years ago to track expenses, and explained that
the spreadsheet provides a breakdown of the various projects that have been done on both production
and distribution sides, including actual expenses from FY 2003 to FY 2012. Also included on the
spreadsheet was a total amount for each category, (including the amount budgeted for this fiscal
year) which reflected any carry over required, ensuring everything is accounted for when jobs are
complete. She stated that operational expenses including staff time, advertising, laundry claims,
complaints, etc., are also included on the spreadsheet.
In response to Mrs. Williams regarding the cost of replacing unlined cast iron pipe, Mrs. Duca
explained that with staff doing the work, the cost to replace one (1) mile of pipe each year would be
under $1M per year since labor is accounted for in the Departments operating expenses. She noted
with larger projects, such as the Route 13 project that was recently completed, the expense would
exceed $1M per mile. She felt that the time would come when the City’s manpower limitation
(having only one (1) crew) would require the use of contractors as well. Mrs. Duca explained that
within the next five (5) years, as staff encounters water lines that are more appropriate in size,
consideration would be given to relining rather than replacing pipe. She noted that this may require
expending a three year (3) allocation of funds for the project within one (1) year to obtain the best
cost overall. Mrs. Duca noted that staff was still analyzing this project.
In response to Mrs. Williams’ concerns regarding leakage into groundwater and the County’s sewer
system, Mrs. Duca explained that leakage would not necessarily go into the sewer; however, the
Department of Natural Resources and Environmental Control (DNREC) had issues regarding slow
leaks from the system into the ground. She noted that DNREC had concerns regarding how quickly
chlorinated water reaches a receiving body of water; therefore, it was important to keep the City’s
water loss at a minimum.
Responding to Councilman Hutchison regarding the life expectancy of the new piping that was
recommended, Mrs. Duca advised members that the cement-lined ductile iron pipe has had the best
field testing and has a life expectancy of approximately 80-100 years. She noted that the existing
cast iron lines had been in the ground for approximately 100 years and were manufactured prior to
relining technology development. Mrs. Duca explained that the process of replacing pipes in the
City began about six (6) or seven (7) years ago and included the replacement of some of the lines that
were installed in the early 1800s. She noted that these projects would improve the structural integrity
of the system.
Proceeding to the Inflow/Infiltration Update presentation (Attachment #4), Mrs. Duca provided an
overview of the program and stated that these assessments had not been “on the books” as long as
the water quality concerns, so it had taken some time to identify the issues and the best way to
address the problem. She reviewed the presentation, outlining specifics pertaining to the City’s
Inflow & Infiltration system. She attributed much of the problem to the age of the City’s pipes and
progressive deterioration, which increase the possibility of groundwater entering the system and
Paj 3
UTILITY COMMITTEE MEETING OF NOVEMBER 13, 2012 PAGE 3
resulting in increased cost to the City. Mrs. Duca reminded members that the City pays for what is
discharged; however, customers are charged based on their usage.
Referring to Page 4 of the presentation, Mrs. Duca explained that inflow and infiltration can enter
the system as a result of broken laterals, mains, manholes, direct connections, and sump pump
connections, all of which contribute to the issue of what enters the City’s sanitary sewer system and
is not directed to the storm drain or other drainage features. She elaborated by displaying a chart
representing the increased costs associated with the inflow and infiltration issues. Mrs. Duca
presented some of the ways the City is trying to assess the problems and strategies being
implemented to work toward resolution, explaining that this is a huge undertaking and requires
prioritization based on research regarding the level of damage and structural integrity. She identified
several tools which are utilized to accomplish this, including the City’s Closed Circuit Television
(CCTV) Sewer Truck and staff certification in the Pipeline Assessment Certification Program
(PACP) for the use of the GraniteXP software, allowing them to assess each pipe in the system.
Mrs. Duca advised members of the efforts currently in motion to address the problem, including
interceptors on Division Street, northwest Loockerman Street, and the St. Jones, as well as main
replacements on New and Reed Streets, infrastructure replacement in Morris Estates, and Fox Hall
manhole replacement. She stated that the Fox Hall manhole replacement was almost complete and
was the last item that would be attributed to City I & I infrastructure; remaining concerns are related
to I & I from private sources.
Mrs. Duca concluded her presentation by outlining the resources needed to achieve the desired
results, including increased dedicated financial resources, increased and long term staffing resources,
and utilization of outside consultants and contractors to meet critical timeframes. She noted that the
cost of utilizing contractors to complete the work was much higher on the I & I side due to the
specialty relining, as well as the ultimatums on the actual replacement of the sewer line.
Referring to the City of Dover Inflow and Infiltration Applicable Expenditures Report
(Attachment #3), Mrs. Duca explained that the report, which dates back to FY 2008 when projects
began in an effort to resolve the I & I problem, outlined the expenses involved in the various
projects, including the CCTV Sewer Truck investment, staff time, etc. She noted that the cost of
doing the work internally by utilizing the truck and internal staff was a fraction of what it would cost
to use an outside contractor. Mrs. Duca stated that the City is trying to get Kent County to grant
impact fee credits for what is being removed from the system to offset some of the expenses
incurred.
Committee action was not required.
Quarterly Review of Utility Related Capital Investment Plan (CIP) (Electric and
Water/Wastewater) (July, August, and September)
Due to time constraints, this item was deferred until the next meeting.
Paj 4
UTILITY COMMITTEE MEETING OF NOVEMBER 13, 2012 PAGE 4
TEA/NAES Report (August)
Due to time constraints, this item was deferred until the next meeting.
Updates - Garrison Oak Technical Park
Due to time constraints, this item was deferred until the next meeting.
Mr. Blakeman moved for adjournment, seconded by Mr. Perza and unanimously carried.
Meeting Adjourned at 5:30 P.M.
Beverly C. Williams
Acting Chair
BCW/DD/mk/js/tm
S:\AGENDAS-MINUTES-PACKETS\Committee-Minutes\2012\11-13-2012 UTILITY.wpd
Attachment
Attachment #1 - Water Quality Update Presentation
Attachment #2 - City of Dover Water Quality Applicable Expenditures
Attachment #3 - City of Dover Inflow and Infiltration Applicable Expenditures
Attachment #4 - Inflow/Infiltration Update Presentation
Paj 5
Attachment #1
Utility Committee Meeting November 13, 2012
WATER QUALITY UPDATE
UTILITY COMMITTEE PRESENTATION Attachment #1
NOVEMBER 13, 2012
Utility Committee Meeting November 13, 2012
DEPARTMENT OF PUBLIC WORKS
Paj 6
WATER QUALITY OVERVIEW
• Water Quality issues (i.e. brown water) began
in 2002 following the implementation of
mandated chemical addition.
• As is the case with other systems nationwide,
Dover’s water system was not designed for
chemical addition.
▫ Complex system
▫ 3 aquifer sources
▫ Multiple entry points (1 Water Treatment Plant and
15 unmanned wells with treatment)
Paj 7
WATER QUALITY OVERVIEW
• Consultants have been utilized to assist staff in
analyzing the system, finding solutions to
brown water issues and designing projects.
• “Magic Pill” or “Textbook” solutions do not
exist.
• It will take the dedication of staff time and
financial resources to address all components
relating to this problem.
Paj 8
WATER QUALITY EXPENSES & COMPLAINTS
Paj 9
ADDRESSING THE PROBLEM –
PRODUCTION CAPITAL IMPROVEMENTS
• Deep Well Contact Chambers
▫ Chambers have been
installed at all sites by our
in-house Construction Crew
▫ Will be required at any
future deep well sites
▫ Testing by our Water
Operators demonstrates that
chemical reactions resulting
from mandated chemical
addition are stabilized
Paj 10
ADDRESSING THE PROBLEM –
PRODUCTION CAPITAL IMPROVEMENTS
• Wellhead Redevelopment
Program
▫ Annual program to improve
capacity and flow
• Wellhead VFD Upgrades
▫ Installed at appropriate wells to
improve flow control
• Remote Control & Monitor Wells
▫ Installed to improve control at all well sites,
primarily by our Water Operators
Paj 11
ADDRESSING THE PROBLEM –
DISTRIBUTION CAPITAL IMPROVEMENTS
• Pipe material control
▫ Cement-lined DIP
• Water Main Replacement Priority
List
▫ Developed by our engineering
staff to determine prioritization
schedule for water main relining
and/or replacement projects to
meet industry standards and
address water quality concerns
Paj 12
ADDRESSING THE PROBLEM –
DISTRIBUTION CAPITAL IMPROVEMENTS
• Water Main Upgrades
▫ Since FY 2009 the Department
has upgraded 24,842 l.f. (4.7
miles) of undersized and
unlined cast iron pipe
primarily with our in-house
Construction Crew
▫ It is planned to replace a
minimum of one (1) mile per
year starting FY 2014
Paj 13
ADDRESSING THE PROBLEM - OPERATIONS
• Additional Monitoring &
System Analysis
▫ Continuous monitors
installed at all well sites by
our Water Operators to
allow them to receive and
respond to water quality
parameter changes quickly
▫ New radios and antennas
also installed by our Water
Operators to enable proper
equipment functioning
Paj 14
ADDRESSING THE PROBLEM - OPERATIONS
• Water System Flushing
▫ Continue to conduct two (2),
three (3) week long system wide
flushing operations
▫ Design utilizing water model,
perform field testing for and
implement Unidirectional
Flushing Program for water
system to provide the most
effective cleaning of the water
mains (projected FY 2015)
Paj 15
DESIRED RESULTS AND RESOURCES
• The improvements desired to the City’s
water system will require:
▫ Increased, dedicated and long term financial
resources.
FY 2013 Capital Budget = $916,142
▫ Increased, dedicated and long term staffing
resources.
Goals will require time from our 36 Water /
Wastewater Utility staff members including
engineers, field crews, construction
workers, inspectors and water operators.
▫ Utilization of consultants and outside
contractors to meet critical time frames.
Paj 16
Attachment #2
Utility Committee Meeting November 13, 2012
CITY OF DOVER WATER QUALITY APPLICABLE EXPENDITURES
PROJECT INFORMATION FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 TO DATE FY 2013 BUD
Production CIP Expenses
Wellhead Redevelopment Program $12,179.00 $52,736.00 SPENT:
Description : capacity and flow improvements WD0801 WD1102 $67,675.00
WQ Recommendation : n/a $32,151.00 PENDING:
Account # : 417-6800-568.40-31 $990.00 $150,961.29 $143,840.15 $23,838.98 $21,984.00 WD0904 $70,238.00 $6,600.00 $55,134.50 $674,695.92 $2,325.00
Project #: WS0201 WS0404 WS0505 WS0606 WD0801 $36,368.00 WD1001 WD1102 WD1203 WD1301
Water System SCADA Upgrade WD0905
Description : flow control improvements
WQ Recommendation : data acquisition and storage
Account # : 417-6800-568.40-31 $192,198.00 $21,294.60 $213,492.60
Project #: WS0301 WS0301
Water Quality Evaluation
Description : system analysis
WQ Recommendation : n/a
Account # : 417-6800-568.40-34 $1,660.00 $77,407.64 $79,067.64
Project #: WD0504 WD0504
Water Quality Improvements: WTP Transducer / Analyzers
Description : flow control improvements, monitoring
WQ Recommendation : water quality monitoring (analyzers)
Account # : 417-6800-568.40-34 $12,317.10 $12,317.10
Project #: WS0502
Water Quality Improvements: Well #2 VFD Upgrade
Description : flow control improvements
WQ Recommendation : n/a
Account # : 417-6800-568.40-34 $22,655.85 $22,655.85
Project #: WS0502
Water Quality Improvements: Consulting
Description : Deep Well Contact Chamber Design, Stage II
Disinfection By-Product Rule Analysis
WQ Recommendation: deep well contact chambers,
preparation for new / pending regulations
Account # : 417-6800-568.40-34 $103,765.47 $35,836.70 $139,602.17
Project #: WS0502 WD0811
Bayard Avenue Contact Chamber: Well #13R
Description : chlorine reaction time improvements
WQ Recommendation : deep well contact chambers
Account # : 417-6800-568.40-34/.40-31 $71,043.47 $8,905.21 $79,948.68
Project #: WS0707 WS0707
Remote Control and Monitor Wells
Description : flow control improvements
WQ Recommendation : n/a
Account # : 417-6800-568.40-31 $51,135.46 $63,767.66 $23,104.00 $31,896.00 $169,903.12
Project #: WD0802 WD0802 WD1002 WD1002
Water Quality Improvements: Deep Well Contact Chambers
Wells #1, #2, #3, #4, #6, #7, #8, #9, #10, #11, #14, #15
Description : chlorine reaction time improvements
Attachment #2
WQ Recommendation : deep well contact chambers
Account # : 417-6800-568.40-34/.40-31 $805,753.22 $95,484.30 $901,237.52
Project #: WD0811 WQ0904
Wellhead VFD Upgrades: Well #11
Description : flow control improvements
WQ Recommendation : n/a
Account # : 417-6800-568.40-31 $2,505.06 $18,780.94 $21,286.00
Project #: WD0808 WD0808
Utility Committee Meeting November 13, 2012
Updated: 11-13-12 Department of Public Works Page 1 of 6
Paj 17
CITY OF DOVER WATER QUALITY APPLICABLE EXPENDITURES
PROJECT INFORMATION FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 TO DATE FY 2013 BUD
Wellhead VFD Upgrades: Well #13R
Description : flow control improvements
WQ Recommendation : n/a
Account # : 417-6800-568.40-31 $2,505.06 $11,717.99 $14,223.05
Project #: WD0809 WD0809
Wellhead VFD Upgrades: Well #15
Description : flow control improvements
WQ Recommendation : n/a
Account # : 417-6800-568.40-31 $2,505.06 $11,717.99 $14,223.05
Project #: WD0810 WD0810
Wellhead VFD Upgrades: Well #3
Description : flow control improvements
WQ Recommendation : n/a
Account # : 417-6800-568.40-31 $17,960.97 $17,960.97
Project #: WD0901
Wellhead VFD Upgrades: Well #9
Description : flow control improvements
WQ Recommendation : n/a
Account # : 417-6800-568.40-31 $20,262.38 $20,262.38
Project #: WD0902
Production CIP Expenses $193,188.00 $172,255.89 $145,500.15 $101,246.62 $209,781.89 $931,129.77 $239,692.23 $93,342.00 $38,496.00 $107,870.50 $2,380,876.05 $70,000.00
Distribution System CIP Expenses
Dead End Water Main Removal
Description : flow improvements
WQ Recommendation : n/a
Account # : 417-6800-568.40-34 $22,391.79 $22,391.79
Project #: WD0306
Division Street Water Main Upgrade
Description : unlined pipe replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-34 $12,033.20 $8,498.73 $1,334,251.51 $1,354,783.44
Project #: WD0304 WD0304 WD0304
Misc. Distribution System Improvements
Description : capacity and flow improvements,
unlined pipe replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-34 $100.00 $56,440.04 $20,917.96 $36,700.41 $21,449.28 $20,206.06 $21,188.32 $11,352.86 $39,772.12 $228,127.05
Project #: WD0401 WD0503 WS0602 WS0706 WD0806 WD0903 WD1004 WD1101 WD1201
Water Quality Improvements: Bayard Avenue Connection
Description : Division Street Upgrade completion
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-34 $23,102.71 $23,102.71
Project #: WS0502
Water Quality Improvements: Water Main Rehabilitation
Description : Surveying and Design
WQ Recommendation: main rehabilitation
Account # : 417-6800-568.40-31 $50,137.50 $50,137.50
Project #: WD0811
Water Quality Improvements: Pear St./West St.
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $321,903.84 $203,693.63 $525,597.47
Project #: WQ0902 WQ0902
Updated: 11-13-12 Department of Public Works Page 2 of 6
Paj 18
CITY OF DOVER WATER QUALITY APPLICABLE EXPENDITURES
PROJECT INFORMATION FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 TO DATE FY 2013 BUD
Water Quality Improvements: South St.
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $37,469.28 $37,469.28
Project #: WQ0903
Water Quality Improvements: Washington St./Pennsylvania Ave.
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $310,063.02 $310,063.02
Project #: WQ0901
Water Quality Improvements: Route 13 Water Main
Description: capacity improvements, unlined pipe SPENT:
replacement $20,055.68
WQ Recommendation : main rehabilitation PENDING:
Account # : 417-6800-568.40-31 $67,396.65 $56,599.26 $40,948.72 $1,905,647.45 $2,090,647.76 $172,544.32
Project #: WQ0907 WQ0907 WQ0907 WQ0907 WQ0907
Water Quality Improvements: Bayard Ave. area Partial Const.
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $6,490.00 $242,720.76 $255,995.67 $505,206.43
Project #: WQ0905 WQ0905 WQ0905
Water Quality Improvements: East of North State Street
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $29,002.50 $147,821.91 $176,824.41
Project #: WQ0906 WQ0906
S. Governors Avenue Water Main Upgrade
Description : capacity improvements
unlined pipe replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-34 $2,664.00 $81,534.98 $84,198.98
Project #: WD0807 WD0807
Water Quality Improvements: McKee Run Plant WMR
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $95,612.76 $95,612.76
Project #: WQ1001
Water Quality Improvements: Walker Road
Description : Surveying and Design
WQ Recommendation: main rehabilitation
Account # : 417-6800-568.40-31 $23,750.00 $23,750.00
Project #: WQ1002
Water Quality Improvements: Loockerman Plaza
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $104,625.86 $104,625.86
Project #: WQ1101
Updated: 11-13-12 Department of Public Works Page 3 of 6
Paj 19
CITY OF DOVER WATER QUALITY APPLICABLE EXPENDITURES
PROJECT INFORMATION FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 TO DATE FY 2013 BUD
Water Quality Improvements: Ross Street
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $4,250.00 $4,250.00
Project #: WQ1103
Water Quality Improvements: Wesley Campus (N. & S. Bradford)
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $103,298.32 $103,298.32
Project #: WQ1201
Water Quality Improvements: New Street
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $26,600.00 $26,600.00 $87,400.00
Project #: WQ1202 WQ1202
Water Quality Improvements: Silver Lake WMR
Description: capacity improvements, unlined pipe SPENT:
replacement $49,145.82
WQ Recommendation : main rehabilitation PENDING:
Account # : 417-6800-568.40-31 $155,300.44 $204,446.26 $85,995.73
Project #: WQ1203 WQ1203
Water Quality Improvements: North Street
Description: capacity improvements, unlined pipe SPENT:
replacement $33,335.00
WQ Recommendation : main rehabilitation PENDING:
Account # : 417-6800-568.40-31 $33,335.00 $11,665.00
Project #: WQ1301
Water Quality Improvements: West Street W Alley
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $4,250.00 $4,250.00 $161,000.00
Project #: WQ1105 WQ1105
Water Quality Improvements: Columbia Avenue
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $4,250.00 $4,250.00
Project #: WQ1102
Water Quality Improvements: William Street
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $4,250.00 $4,250.00 $280,000.00
Project #: WQ1104 WQ1302
Water Quality Improvements: Governors Avenue West Alley
Description: capacity improvements, unlined pipe
replacement
WQ Recommendation : main rehabilitation
Account # : 417-6800-568.40-31 $0.00 $15,000.00
Project #: WQ1303
Distribution System CIP Expenses $34,424.99 $8,598.73 $56,440.04 $1,355,169.47 $59,803.12 $71,586.78 $792,531.35 $403,507.97 $564,470.11 $2,568,148.98 $6,017,218.04 $916,141.55
Updated: 11-13-12 Department of Public Works Page 4 of 6
Paj 20
CITY OF DOVER WATER QUALITY APPLICABLE EXPENDITURES
PROJECT INFORMATION FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 TO DATE FY 2013 BUD
Operating Expenses
Claims Since 12/2002
Description : damaged laundry, etc.
WQ Recommendation : n/a
Account # : 412-6800-568.20-51 $1,143.31 $3,376.00 $5,586.40 $2,939.41 $1,259.93 $1,888.82 $417.74 $1,220.38 $921.32 $740.60 $19,493.91 $1,000.00
Distribution System Flushing $19,602.12 $112,406.97 $105,572.54 $177,062.77 $184,505.68 $82,072.50 $78,730.45 $77,118.90 $78,205.14 $78,267.80 $993,544.87 $81,600.00
Description : advertising, labor, supplies
WQ Recommendation : distribution system flushing program
c ADVERTISING
Account #: 412-6800-568.30-25 $504.12 $5,309.70 $2,974.44 $9,592.00 $15,340.30 $12,156.08 $9,530.45 $7,218.90 $7,105.14 $5,122.80 $74,853.93 $7,500.00
c LABOR (in-house)
Account #: 412-2600/5600/6800/6900/7600 $19,098.00 $106,948.80 $101,856.00 $165,516.00 $168,257.35 $68,768.64 $68,100.00 $68,800.00 $70,000.00 $72,045.00 $909,389.79 $73,000.00
c SUPPLIES - DISTRIBUTION (estimate)
Account #: 412-6800-568 $148.47 $742.10 $777.31 $598.03 $892.78 $800.00 $800.00 $800.00 $800.00 $6,358.69 $800.00
c SUPPLIES - WTP (estimate)
Account #: 412-7600-576 $1,177.46 $310.00 $255.00 $300.00 $300.00 $300.00 $300.00 $2,942.46 $300.00
System Monitoring
Description : sample analysis supplies (est.)
WQ Recommendation : distribution system monitoring, water
quality monitoring program
Account # : 412-7600-576 $3,276.90 $4,521.48 $3,909.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 $25,707.38 $3,500.00
Operating Expenses $20,745.43 $115,782.97 $111,158.94 $183,279.08 $190,287.09 $87,870.32 $82,648.19 $81,839.28 $82,626.46 $82,508.40 $1,038,746.16 $86,100.00
WATER QUALITY EXPENSE TOTAL $248,358.42 $296,637.59 $313,099.13 $1,639,695.17 $459,872.10 $1,090,586.87 $1,114,871.77 $578,689.25 $685,592.57 $2,758,527.88 $9,436,840.25 $1,072,241.55
WATER QUALITY COMPLAINTS 271 627 906 369 542 241 221 249 111 118 2,956
Updated: 11-13-12 Department of Public Works Page 5 of 6
Paj 21
CITY OF DOVER WATER QUALITY APPLICABLE EXPENDITURES
PROJECT INFORMATION FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 TO DATE FY 2013 BUD
$3,000,000.00 3,000
PRODUCTION CIP EXPENSES $107,870.50
$2,500,000.00 DISTRIBUTION SYSTEM CIP EXPENSES 2,500
OPERATING EXPENSES
WATER QUALITY COMPLAINTS
$2,000,000.00 $101,246.62 2,000
$1,355,169.47
$183,279.08 $2,568,148.98
$1,500,000.00 1,500
$931,129.77 $239,692.23
$145,500.15 $792,531.35
$71,586.78
$56,440.04 $87,870.32 $82,648.19
$172,255.89 $111,158.94
$209,781.89 $38,496.00
$1,000,000.00 1,000
$8,598.73 906 $93,342.00 $564,470.11
$59,803.12
$193,188.00 $115,782.97 $403,507.97
$82,626.46
$190,287.09
$34,424.99
$81,839.28
$20,745.43 627 542
$500,000.00 500
249
369
221
271
111
241
118 $82,508.40
$0.00 0
FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012
Updated: 11-13-12 Department of Public Works Page 6 of 6
Paj 22
Attachment #3
Utility Committee Meeting November 13, 2012
CITY OF DOVER INFLOW AND INFILTRATION APPLICABLE EXPENDITURES
PROJECT INFORMATION FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 TO DATE FY 2013 BUD
CIP Expenses
Inflow/Infiltration Removal Program
Description : design, rehabilitation of sanitary sewer with I&I problems
Account # : 417-6900-569.40-31 $5,160.98 $1,350.52 $1,767,683.77 $451,249.04 $54,612.78 $2,280,057.09 $1,122,087.22
Project #: WW0803 WW0903 WW1001 WW1101 WW1201 Various
Inflow/Infiltration Removal - New Street/Reed Street SPENT:
Description : Numerous cracks, reverse flow on main $43,940.52
Account # : 417-6900-569.40-31 $43,940.52 PENDING:
$286,059.48
Project #: II1301
Inflow/Infiltration Removal - Fox Hall Sewer Rehab
Description : manholes allowing infiltration
Account # : 417-6900-569.40-31 $0.00
$142,000.00
Project #: II1302
Inflow/Infiltration Removal - Morris Estates Sewer Rehab
Description : pipe deterioration, causing infiltration
Account # : 417-6900-569.40-31 $0.00
$276,000.00
Project #: II1303
Inflow/Infiltration Removal - Wesley College Sewer Rehab SPENT
Description : Various cracks causing infiltration $7,200.00
Account # : 417-6900-569.40-31 $7,200.00 PENDING:
$0.00
Project #: II1304
Inflow/Infiltration Removal - NRG Sewer Rehab
Description : Inflitration occuring in existing interceptor
Account # : 417-6900-569.40-31 $0.00
$175,000.00
Project #: II1305
Attachment #3
Inflow/Infiltration Removal - FY13 I & I Design SPENT:
Description : consultant review of three sanitary sewer basins $14,023.90
Account # : 417-6900-569.40-31 $14,023.90 PENDING:
$25,976.10
Project #: II1306
Lepore Road Pump Station Replacement
Description : installing new liner in wet well to prohibit infiltration
Account # : 417-6900-569.40-31 $0.00
$50,000.00
Utility Committee Meeting November 13, 2012
Project #: WW1104
CIP Expenses $5,160.98 $1,350.52 $1,767,683.77 $451,249.04 $54,612.78 $2,345,221.51 $1,967,287.22
Updated: 11-13-12 Department of Public Works Page 1 of 3
Paj 23
CITY OF DOVER INFLOW AND INFILTRATION APPLICABLE EXPENDITURES
PROJECT INFORMATION FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 TO DATE FY 2013 BUD
Operating Expenses
PACP Certification (10) $3,000.00 $3,000.00
Staff trained to properly identify and rate sanitary sewer condition
Recording and Rating Sanitary Sewer Mains $14,734.16 $20,471.08 $35,205.24 $22,645.00
Staff labor hours.
GraniteXP Software $3,600.00 $3,600.00 $7,200.00 $3,600.00
Initial software cost and corresponding yearly fee
CCTV Camera Truck $199,900.00 $199,900.00
Operating Expenses $0.00 $202,900.00 $0.00 $18,334.16 $24,071.08 $245,305.24 $26,245.00
INFLOW AND INFILTRATION REMOVAL EXPENSE TOTAL $5,160.98 $204,250.52 $1,767,683.77 $469,583.20 $78,683.86 $2,590,526.75 $1,993,532.22
Updated: 11-13-12 Department of Public Works Page 2 of 3
Paj 24
CITY OF DOVER INFLOW AND INFILTRATION APPLICABLE EXPENDITURES
PROJECT INFORMATION FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 TO DATE FY 2013 BUD
$2,500,000.00
$1,967,287.22
$26,245.00
$2,000,000.00
$1,767,683.77
$0.00
$1,500,000.00
$1,000,000.00
$451,249.04
$18,334.16
$500,000.00
$1,350.52
$202,900.00
$5,160.98
$0.00
$0.00
FY 2008 FY 2009 FY 2010 FY 2011 FY 2012
Updated: 11-13-12 Department of Public Works Page 3 of 3
Paj 25
Attachment #4
Utility Committee Meeting November 13, 2012
INFLOW / INFILTRATION UPDATE
UTILITY COMMITTEE PRESENTATION Attachment #4
NOVEMBER 13, 2012
Utility Committee Meeting November 13, 2012
DEPARTMENT OF PUBLIC WORKS
Paj 26
INFLOW AND INFILTRATION OVERVIEW
• In FY 2010, the City of Dover experienced its
wettest year in recent memory. An estimated
1.97 billion gallons were sent for treatment at
the Kent County Wastewater Treatment Plant
with 0.26 billion gallons sent in March 2010
alone.
• On average, the annual volume of wastewater
sent is approximately 1.58 billion gallons. The
monthly average is approximately 0.13 billion
gallons.
• At $2.34/1,000 gallons, inflow and infiltration
accounts for $304,200 on a monthly basis.
Paj 27
INFLOW AND INFILTRATION OVERVIEW
• The threat of infiltration is continuously
increasing. The pipes in the ground are
deteriorating, which increases the possibility of
groundwater entering our sanitary sewer
system.
• Older homes and developments also have illicit
connections to sanitary sewer mains, which
send rain water / groundwater to our system.
• The City of Dover is a contract user of Kent
County and therefore charged by the volume of
wastewater sent to the WWTP for treatment.
Paj 28
INFLOW AND INFILTRATION BASICS
• Inflow Examples
• Roof Drain Connection
to the Sanitary Sewer
• Uncapped Cleanout,
connected to the
Sanitary Sewer
• Storm Sewer Cross
Connection
• Infiltration Examples
• Broken House Lateral
• Root Intrusion into
Lateral
• Cracked or Broken
Sanitary Sewer Pipe
Paj 29
INFLOW AND INFILTRATION EXPENSES
Paj 30
ASSESSING THE PROBLEM
• Pump Station Flow Analysis
▫ Developed by engineering staff
to determine which sanitary
sewer basins have the largest
inflow and infiltration problem.
▫ This analysis is utilized to
prioritize the video inspection of
the sanitary sewer basins.
• Rehabilitation Methods
▫ Ultraviolet Cured Fiberglass
reliner
▫ Infrastructure replacement
Paj 31
ASSESSING THE PROBLEM
• Utilization of CCTV Sewer Truck
▫ Wastewater Maintenance staff assesses the sanitary
basins to record any structural/operational issues.
• Pipeline Assessment
Certification Program (PACP)
▫ Staff are certified in the
PACP methodology. With
the use of the GraniteXP
software package, staff
can rate each pipe in the
system, justifying the
need for rehabilitation.
Paj 32
ASSESSING THE PROBLEM – VIDEO INSPECTIONS
Paj 33
ADDRESSING THE PROBLEM –
TRANSMISSION CAPITAL IMPROVEMENTS
• Inflow and Infiltration
Rehabilitation
▫ Division Street, Northwest,
Loockerman Street, St. Jones
Interceptor Relining
▫ New Street / Reed Street
Main Replacement
▫ Morris Estates Infrastructure
Replacement
▫ Fox Hall Manhole
Replacement
Paj 34
DESIRED RESULTS AND RESOURCES
• The improvements desired to the City’s water
system will require:
▫ Increased, dedicated and long term financial resources.
FY 2013 Capital Budget = $1,967,287
▫ Increased, dedicated and long term staffing resources.
Goals will require time from 23 Water / Wastewater
Utility staff members including engineers, field crews
and inspectors
▫ Utilization of consultants and outside contractors to
meet critical time frames.