Paj 1
UTILITY COMMITTEE
AGENDA
November 14, 2011 - 5:00 P.M. - Council Chambers - City Hall - City of Dover
Public comments are welcomed on any item and will be permitted at appropriate
times. When possible, please notify the City Clerk (736-7008 or e-mail at
CityClerk@dover.de.us) should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. Request for Street Name Change - Slaughter Street (Between Loockerman Street and North
Street)
2. TEA/NAES Monthly Report (August)
3. Updates
A. Green Energy Funding and Programming
B. National Pollution Discharge Elimination System (NPDES) Municipal Separate Storm
Sewer Systems (MS4) Permit
4. Adjournment by 5:25 P.M.
/tm
S:\AGENDAS & MINUTES\Committee-Agendas\2011\11-14-2011 UTILITY.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO
INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Paj 5
City of Dover
REQUEST FOR STREET NAME CHANGE
Utility Committee of City of Council
Meeting of November 14, 2011
Recommendation from the Planning Commission
Meeting of October 17, 2011
Petitioner: New Jerusalem Baptist Church
C/o Reverend Clifton Holmes
25 Slaughter Street
Dover, DE 19904
Location: One block segment of Slaughter Street which runs in a north-south direction
between West North Street and West Loockerman Street just east of the
railroad corridor
Purpose: Request to change the street name of this street segment from Slaughter
Street to Jerusalem Way. Request was filed in accordance with the Dover
Code of Ordinances, Chapter 98, Article II, Section 98-45 Street name
change Procedure
Proposed Street Name: Jerusalem Way
File Number: MI-11-11
Recommendation of the Planning Commission:
This Request for a Street Name Change (Slaughter Street to Jerusalem Way) was considered by
the Planning Commission at their meeting on October 17, 2011. Six members of the Planning
Commission were present with three members absent. Information on the Request was presented
to the Planning Commission by Planning Staff and by the petitioner, Reverend Clifton Homes on
behalf of New Jerusalem Baptist Church. According to the street name change procedures, a
public hearing was not required. The Planning Commission was also provided the attached
Report and Comments from the Development Advisory Committee (D.A.C.). See Attached
Report with Comments from the Department of Public Utilities, DelDOT, and Kent County
Department of Planning Services – Division of Geographic Information Systems: 911
Addressing.
The Planning Commission unanimously recommended in favor of the requested street name
change from Slaughter Street to Jerusalem Way (for the segment of Slaughter Street running
between West North Street and West Loockerman Street), with six (6) members voting in favor
of the street name change and three (3) members absent. An excerpt of the draft minutes of the
Planning Commission discussion on the application is attached.
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Paj 6
Excerpt of DRAFT Meeting Minutes for Planning Commission Meeting of October 17, 2011:
MI-11-11 Request for Street Name Change: Slaughter Street to Jerusalem Way – Review
for Recommendation to City Council of a Request for a Street Name Change for the one block
segment of Slaughter Street which runs in a north-south direction between West North Street and
West Loockerman Street just east of the railroad corridor. The new street name proposed is
Jerusalem Way. The request was filed in accordance with Dover Code of Ordinances, Chapter
98, Article II, Section 98-45 Street name change procedure which also references Appendix A:
Land Subdivision Regulations, Article VI, Section A. Streets. The name change procedure
requires review and comments by the Development Advisory Committee (DAC) and review by the
Planning Commission prior to public hearing and consideration by the City Council.
Representative: Reverend Clifton Holmes, New Jerusalem Baptist Church.
Mrs. Melson-Williams stated that this is a petition that was received by the City. The City of
Dover Code of Ordinances in Chapter 98 has a specific procedure for street name changes in
how that happens. The petition was filed and the review process begins with the Development
Advisory Committee. Comments were provided from the Development Advisory Committee
that she will highlight and then it moves onto the Planning Commission for review. You are to
consider the request this evening. There is no hearing that is required and your action this
evening is a recommendation regarding the name change request along with your reasons for
doing so.
Mrs. Melson-Williams further stated that the background report talks about the short segment of
Slaughter Street, specifically the segment of Slaughter Street that is one block in length and runs
in a north/south direction between what is West North Street and the terminus of Loockerman
Street near the train station. This request is to change that street segment from Slaughter Street
to Jerusalem Way.
Mrs. Melson-Williams further described some history about the area; it appears that the name
Slaughter Street for that street segment was identified in the late 1800’s. One of the property
owners in the vicinity and of this street segment was a T. Slaughter. This name appears on some
of the historical maps marking ownership in the area. There are a number of other names that
actually were used including Negro Street for this street. Basically, the street does not come into
existence until around 1885.
Mrs. Melson-Williams further stated that today, for the segment of Slaughter Street on the west
side is the Duncan Center building. The Duncan Center is addressed off of West Loockerman
Street; however, access to the parking facilities for that building comes off of Slaughter Street.
On the east side of Slaughter Street, only one building remains which is the church building that
is currently occupied by the New Jerusalem Baptist Church. In requesting the street name
change, there are some provisions within the Land Subdivision Regulations that go to the naming
conventions for streets and the proposed street name “Jerusalem Way” follows these
conventions.
Paj 7
Mrs. Melson-Williams further stated that the Planning Staff is recommending approval of the
street name change and our comments include that there will, if successful, have to be
notification of that street name change as well as installation of new street signage in the area.
The other reporting DAC agencies include the Public Utilities Department that comments on the
need for updated street signage should the change occur. There were no specific comments that
DelDOT had on the change. The Kent County 911 Addressing Center notes that they have no
objection to the proposed street name of “Jerusalem Way.”
There were no comments from any Planning Commission members at this time.
Reverend Holmes stated that he would appreciate your consideration this evening for this
request. In all due respect to Mr. Slaughter who this street was named after, we have had a
problem with some confusion with the other part of Slaughter Street with people stopping all the
time to ask for directions as well as confusion with mail delivery. This will help with the
confusion and is the reason for the request of the name change. He also noted that several
members of the church’s Board of Trustees were also present in the audience in support of the
request.
Mr. Hemmig stated that there is no public hearing required for this application.
Colonel Welsh moved to forward a recommendation of approval to City Council for MI-11-11
Request for Street Name Change: Slaughter Street to Jerusalem Way, seconded by Mr. Baldwin
and the motion was unanimously carried 6-0 with Mr. Tolbert, Mr. Nichols and Mr. Friedman
absent.
Paj 8
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
D.A.C MEETING DATE: October 5, 2011
=====================================================================
APPLICATION: Request for Street Name Change: Slaughter Street to Jerusalem Way
FILE#: MI-11-11 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Dawn E. Melson-Williams, AICP PHONE#: 736-7196
=====================================================================
This request is submitted for Planning Commission review of a Request for a Street Name
Change for the one block segment of Slaughter Street which runs in a north-south direction
between West North Street and West Loockerman Street just east of the railroad corridor. The
new street name proposed is Jerusalem Way.
The request was filed in accordance with Dover Code of Ordinances, Chapter 98, Article II,
Section 98-45 Street name change procedure which also references Appendix A: Land
Subdivision Regulations, Article VI, Section A. Streets. The name change procedure requires
review and comments by the Development Advisory Committee (DAC) and review by the
Planning Commission prior to review by the Utility Committee of City Council and then public
hearing and consideration by the City Council.
History of Area
This area of Dover is part of the downtown grid network of streets. The 1868 Beers Map of Dover
shows limited development in this area with only the railroad corridor and a large block bounded by
Loockerman Street to the north, Queen Street on the east, and North Street on the south. Within the
block, there are two buildings fronting on Loockerman Street, a cemetery adjacent to Queen Street,
and an African Church building. The western portion of the block is owned by T. Slaughter. The
1885 Bird’s Eye View of Dover by Bailey shows a north-south street bisecting the block by 1885
with more extensive building development (residences, a school) fronting the street. Review of the
Sanborn Fire Insurance Map series 1885-1944, shows the street names of Negro Street and
Slaughter Street for this street segment. It appears that this street segment was named for the
adjacent property owner, T. Slaughter.
It is also noted that there is another street segment also named Slaughter Street (not subject to this
request). This street is located west of the railroad corridor and runs east-west with street
connections of Clarence Street and Minima Street to West North Street. This “Slaughter Street” is
depicted on an 1887 Map of Dover by W.B. Roe.
Existing Conditions and Use:
For this one block segment of Slaughter Street, the west side adjacent to the railroad corridor is
developed with a multi-story office building and parking lot known as the Duncan Center and
Paj 9
MI-11-11 Request for Street Name Change: Slaughter Street to Jerusalem Way
DAC Report of October 5, 2011
Page 2
addressed as 500 West Loockerman Street. The site access to the parking lot is from Slaughter
Street. On the east side of the block the only remaining building fronting on the subject street is a
church building (constructed circa 1871) currently occupied by the New Jerusalem Baptist Church.
The church is addressed as 25 Slaughter Street.
This street right-of-way is owned and maintained by the City of Dover.
Request for Street Name Change
The proposed Street Name requested is Jerusalem Way for this segment of Slaughter Street. Within
the Land Subdivision Regulations Article VI, Section A. Streets, guidelines for the naming of
streets are provided.
Article VI. Section A. Streets. 16. Street names shall be selected so as not to duplicate, or be
confused with, the names of existing streets. Street names shall be subject to the approval of the
commission. All new streets shall be named in the following manner:
TABLE INSET:
Short
General Direction Long
(under 1,000 ')
North and south Streets Places
East and west Avenues Courts
Diagonal Roads Ways
Curving Drives Lanes, Circles
Arterial streets shall be named Boulevards
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN
CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY'S
AUTHORITY AND AREA OF EXPERTISE.
RECOMMENDATIONS and ADVISORY COMMENTS:
1. Planning Staff recommends approval of the street name Jerusalem Way as following the
naming conventions for a short one block segment of street.
2. As part of the Development Advisory Committee process, a series of City, County, and
State agencies were notified of the street name change request. Any comments received
regarding the request are attached to this report.
3. Upon approval of the street name change, notification of appropriate City, County, and
State agencies will be completed by the City of Dover.
4. Upon approval of the street name, the installation of updated street name blades on the
street will be completed by the City of Dover.
Paj 10
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: SEPTEMBER 28, 2011
APPLICATION: REQUEST FOR STREET NAME CHANGE: SLAUGHTER STREET TO
JERUSALEM WAY
FILE #: MI-11-11
REVIEWING AGENCY: City of Dover Public Utilities Department
CONTACT PERSON: Steve Enss - Electric
Sharon Duca, P.E. - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC / WATER / WASTEWATER
1. Our office has no objections to the proposed name change.
STORMWATER / GENERAL
1. None.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC / WATER / WASTEWATER / STORMWATER / GENERAL
1. None
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC / WATER / WASTEWATER / STORMWATER
1. None.
GENERAL
1. The new street signs required for this location will be purchased and installed by the Public Services Department.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Paj 11
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE D
E
APPLICATION REVIEW COMMENTARY L
D
D.A.C. MEETING DATE: October 5, 2011
O
========================================================= T
APPLICATION: Request for Street Name Change: Slaughter Street to Jerusalem Way
FILE#: MI-11-11 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY'S
AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. The Department has no comments.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
If you have any questions or need to discuss any of the above comments, please call the above contact person
and the planning department as soon as possible.
Paj 12
Kent County
Department of Planning Services
Division of Geographic Information Systems
SARAH E. KEIFER, AICP Phone: 302/744-2420
Director of Planning Services FAX: 302/736-2128
Email: sabrina.fite@co.kent.de.us
SABRINA FITE
GIS Specialist
TO: - Dawn E. Melson-Williams, AICP
The City of Dover
FROM: Sabrina Fite
911 Addressing
DATE: September 30, 2011
PIN #:
OWNER:
REF: MI-11-11 Request for Street Name Change: Slaughter Street to Jerusalem Way
- Kent County has no objections regarding the proposed street name JERUSALEM WAY
Paj 13
Slaughter Street - Jerusalem Way
Proposed Street Name Change
127 130
131
133 136
585 141
For 135
est
St 321
403
407 329
409
2 415
erman St
k
600
Looc
326
212
412
S Qu
516 416
St
een 371
gh
Slau
25
t
tree
500 ter S
645
St
N orth
W
450
520
350
0 75 150 300 Feet
¯
Date Printed: October 5, 2011 Legend
File: m:\gis_data\projects\tech_mxds
\street_name_change Portion Proposed to be Renamed Jerusalem Way
Department: Public Services GIS
Dover Parcels
City of Dover, Delaware
Paj 14
The Energy Authority, Inc.
Monthly Management Committee Update – August 2011
Revised October 25, 2011
Prepared by:
Jamie Mahne
Member Services Manager
904.360.1374
jmahne@teainc.org
Paj 15
TABLE OF CONTENTS
I. Executive Summary ................................................................................................................ 1
II. Budget Report ......................................................................................................................... 4
III. Energy Management ............................................................................................................ 7
IV. Operations Management .................................................................................................... 16
i
Paj 16
I. Executive Summary
Power Supply:
Power Supply Costs FY2011-12
$9,000,000
$8,000,000
$7,000,000
$6,000,000
$5,000,000
$4,000,000
$3,000,000
$2,000,000
$1,000,000
$0
Jul-11 Aug-11 Sep-11 Oct-11 Nov- Dec-11 Jan-12 Feb-12 Mar- Apr-12 May- Jun-12
11 12 12
Budget Actual
Powers Supply costs were $489,212 under budget due to decreased PJM load (4,338
MWh less than forecast). This variance is inclusive of 1,012MWh of solar power
generated by the Dover Sun Park in August.
Average cost/MWh on the supply side was $90.17 compared to a budgeted cost of
$91.45. Mild temperatures in PJM along with Hurricane Irene’s impact resulted in lower
load and lower energy prices.
Dover’s hedge purchases totaled 61,280 MWh, which was 80% of the projected load.
Versus actual load, this hedged percentage totaled 85% of Dover’s needs for the month.
Dover’s power purchases from hedge transactions totaled $4,435,151. Purchases from
PJM totaled $1,243,031 (all in), with DA Energy purchases totaling $747,504 and
Balancing Spot Market Energy totaling $118,708.
1
Paj 17
Generation Summary
Generation Revenue FY2011-12
$2,000,000
$1,500,000
$1,000,000
$500,000
$-
Jul-11 Aug-11Sep-11 Oct-11 Nov- Dec-11 Jan-12 Feb-12 Mar- Apr-12 May- Jun-12
11 12 12
Budget Actual
Net generation for the month credited by PJM was 2,825MWh. The budget did not
expect any generation. Net generation revenue totaled $145,859 vs. a budget of
$260,656. Dover’s units were dispatched for a total of 9 starts and ran for more than 54
hours this month.
Operations Management Summary
During the month of August, there were no restricted work days or lost time accidents.
The facility has now gone 321 days without an OSHA recordable accident or a Lost Time
reportable accident. The plant received no Notice of Violations (NOVs).
The actual expenses for August are $392,825 against a budgeted amount of $432,020 for
a favorable variance of $39,195 or ≈ 9.07%. The variance was due to the following:
PERSONNEL EXPENSES – Favorable variance of $60,800.
MATERIALS AND SUPPLIES EXPENSES- The account with any appreciable variance was
the Water and Sewer account which was higher than budgeted due to supporting unit operations
for an unfavorable variance of $28,086.
ADMINISTRATIVE EXPENSES – Lower than budgeted expenses in the areas of Electric,
Environmental Expenses, DCS Control Systems / Maintenance and Combustion Turbine
Maintenance contributed to a favorable variance of $6,481.
The current budget forecast for the current fiscal year is $5,917,031 expensed versus an approved
budget of $5,964,818 thereby realizing a 99.20%.expense rate.
2
Paj 18
In the month of August, Units 3 and 11 were dispatched three times and once
respectively by PJM. During the month, Unit 11 also successfully completed the PJM
Capacity Test for the Summer Demonstration Period. Unit 11 was operated for the City
of Dover during Hurricane Irene to supply cranking power to McKee Run Unit 3 which
was on hot standby, in the event the City of Dover was disconnected from the Bulk
Electric System
Risk Management Summary
Similar to July, PJM power prices remained strong through the month of August, against
falling natural gas prices. Subsequently, the PJM heat rate is trading near its highs.
Natural gas storage remains in the low middle of the 5-year range.
The current projected cost of service is below:
Power Year Hedge Ratio Blended Cost
($/MWh)
2011-12 83% $70.57
2012-13 74% $67.84
2013-14 46% $61.15
2014-15 24% $60.69
2015-16 3% $64.81
3
Paj 19
II. Budget Report
Variance Report:
Budget Actual Variance
Aug-11 Aug-11
Load Forecast (Net of Solar Output) 76,807 72,469 4,338
Power Supply
Power Supply (inc. Mgt Fees) $6,327,968 $5,818,037 $509,931
Capacity UCAP Obligated Purchased $695,864 $716,582 ($20,718)
Total - Power Supply $7,023,831 $6,534,619 $489,212
Power Generation O&M & Fixed Fuel
Plant O&M $466,179 $392,825 $73,354
Fixed Fuel and Transport Charges $0 $0 $0
Subtotal Generation O&M & Fixed Fuel $466,179 $392,825 $73,354
Power Generation Production Margin
Economic and reliability dispatch ($118,922) ($121,660) $2,738
Testing $0 $0 $0
Subtotal Generation Production Margin ($118,922) ($121,660) $2,738
Power Generation Non-Production Revenue
Generation Capacity Credit ($573,981) ($376,703) ($197,278)
Emissions Allowance Sales $0 $0 $0
Black Start & Reactive Power Revenue ($33,933) ($40,321) $6,389
Subtotal - Non-Production Revenue ($607,913) ($417,024) ($190,889)
Total - Power Generation ($260,656) ($145,859) ($114,797)
Total - Utilities Cost $6,763,175 $6,388,760 $374,415
Unit Costs
Total - Power Supply $91.45 $90.17 $1.28
Total - Power Generation ($3.39) ($2.01) ($1.38)
Final Cost of Service to City of Dover
Ratepayers $88.05 $88.16 ($0.10)
4
Paj 20
Variance Analysis:
Power Supply
Due to normal temperatures and reduced load in the mid-Atlantic, Dover consumed
4,338MWh below what was forecasted.
The decrease in load along with stable prices in PJM resulted in a cost of $90.17/MWh
for power supply, $1.28/MWh less than budget.
For the month, the city realized a favorable variance of $509,931 for power supply vs.
the monthly budget.
This variance can be attributed to the decrease in load from the forecast.
Generation
Power generation realized an unfavorable budget variance of $114,797.
This included a $215,846 charge from PJM for failure to provide 3.4 MWs of expected
capacity in 2010-2011. This was due to the excursion on unit 1 in July 2010.
Plant O&M expenses realized a favorable budget variance of $73,354.
Power Generation Production Margin realized a favorable budget variance of $2,738.
Dover’s Generation output was sold to PJM at an average of $110/MWh.
5
Paj 21
Variance Year-To-Date:
Budget Actual Variance
YTD YTD
Load Forecast (Net of Solar Output) 155,238 156,013 (775)
Power Supply
Power Supply (inc. Mgt Fees) $12,495,483 $13,093,990 ($598,507)
Capacity UCAP Obligated Purchased $1,391,727 $1,433,187 ($41,459)
Total - Power Supply $13,887,210 $14,527,177 ($639,967)
Power Generation O&M & Fixed Fuel
Plant O&M $1,177,273 $995,740 $181,533
Fixed Fuel and Transport Charges $0 $0 $0
Subtotal Generation O&M & Fixed Fuel $1,177,273 $995,740 $181,533
Power Generation Production Margin
Economic and reliability dispatch ($237,844) ($1,719,489) $1,481,645
Testing $0 $0 $0
Subtotal Generation Production Margin ($237,844) ($1,719,489) $1,481,645
Power Generation Non-Production Revenue
Generation Capacity Credit ($1,147,961) ($969,253) ($178,709)
Emissions Allowance Sales $0 $0 $0
Black Start & Reactive Power Revenue ($67,865) ($115,170) $47,305
Subtotal - Non-Production Revenue ($1,215,826) ($1,084,423) ($131,404)
Total - Power Generation ($276,397) ($1,808,172) $1,531,775
Total - Utilities Cost $13,610,814 $12,719,005 $891,808
Unit Costs
Total - Power Supply $89.48 $92.92 ($3.44)
Total - Power Generation ($1.80) ($10.96) $9.16
Final Cost of Service to City of Dover
Ratepayers $87.68 $81.96 $5.72
6
Paj 22
III. Energy Management
Power Supply
Load (MWh) FY 2011-12
100,000
80,000
60,000
40,000
20,000
0
Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May- Jun-12
12
Budget Actual
Dover’s total load was 72,469 MWh versus a forecasted load of 76,807 MWh.
Dover’s planned hedged volume was 80% of forecast. The decrease in load
resulted in a realized hedged volume of 85% of actual load.
Dover’s planned energy cost/MWh of unhedged load was $121. The actual
energy cost for unhedged load was $124/MWh – this increase on a $/MWh was
more in part to spreading fixed costs across the decreased load than any increase
in PJM prices..
The following is a summary of Dover’s power purchases for the month:
City of Dover's Wholesale Load
Volume $'s
Hedges 61,280 ($4,345,151.60)
PJM Charges 72,469 ($1,959,613.15)
TEA Fees ($83,000.00)
Dover Sun Park ($146,855.10)
Total ($6,534,619.85)
Cost to Serve $/MWh ($90.17)
7
Paj 23
Purchased power variance report:
Budget Actual Variance
Load (MWh) 76,807 72,469 4,338
Hedged Volume (MWh) 61280 61280 0
Unhedged Volume (MWh) 15,527 11,189 4,338
Unhedged Volume (%) 20% 15% 5%
Unhedged Energy Cost ($/MWh) 121 124 (3)
Unit Energy Costs ($/MWh) $82.39 $80.28 $2.10
All-in Unit Energy Costs ($/MWh) $91.45 $90.17 $1.28
8
Paj 24
Generation
Dover produced 2,825MWh of generation over 6 days in August. The total revenue from
energy generation was $311,297. Dover’s production margin equaled $121,660.
Dover sold generation into PJM at an average price of $110.16.
City of Dover's Wholesale Generation
Net Generation Mwh 2,825.89
All In Generation Margin
PJM Bill Energy $ 311,297.35
PJM Capacity $ 376,703.10
Black Start, Reactive Credit, DASR & EFORp $ 40,321.46
Gas Purchases $ (162,735.00)
Oil Purchases $ -
Transport / Cash Out $ (26,902.15)
Gross Margin $ 538,684.76
Production Margin
Generation Production Revenues (PJM) $ 311,297.35
Gas Purchases $ (162,735.00)
Oil Purchases $ -
Transport / Cash Out $ (26,902.15)
Gross Production Margin $ 121,660.20
$/Mwh All In Generation Margin $ 190.62
$/Mwh Generation Production Margin $ 43.05
9
Paj 25
Fuel Purchases
Dover’s generation was not dispatched on #2 Fuel Oil this month. Given the limited
amount of run time, there were limited gas purchases for the units. These are listed
below:
Spot Gas Purchases
New Jersey Natural Gas Date Volume Price Total
8/1/2011 9,000. 4.70 $42,300.00
8/1/2011 3,500. 4.90 $17,150.00
8/2/2011 10,000. 4.72 $47,200.00
8/8/2011 8,000. 4.47 $35,760.00
8/8/2011 1,500. 4.85 $7,275.00
8/26/2011 500. 4.30 $2,150.00
8/27/2011 1,500. 4.40 $6,600.00
34,000 $158,435.00
Hess Corporation Date Volume Price Total
8/15/2011 1,000.00 $4.300 $4,300.00
1,000 $4,300.00
PESCO Date Volume Price Total
0 $0.00
Total 35,000 ($4.65) ($162,735.00)
10
Paj 26
Transportation and Imbalance
Below is a table of the transportation and imbalance charges incurred in August:
Eastern Shore Transport and Imbalance Charges
Imbalance/dth Imbalance/dth Cost/dth Total Cost
77 $4.49 $345.35
$345.35
Transport Volume/dth $/dth Total Cost
IT (Days 1-28) 35,077 $0.460900 $16,166.99
IT (Days 1-28) 33,290 $0.312100 $10,389.82
$26,556.81
Net ($26,902.15)
ESNG was granted a motion to place suspended revised tariff sheets into effect on July
29, 2011 forward. The new IT rate is $.0773/dth.
Emissions
Emissions and Allowance Management
Dover has elected not to include revenues from emission allowance sales in its 2011-
2012 fiscal year budget. Dover has more than sufficient allowances set aside for
retirement (see Exhibit 1). Due to the expiration of EPA’s Clean Air Interstate Rule
(CAIR) at the end of CY2011, any unused or unsold CAIR allowances will expire
without residual value.
Exhibit 1: Emissions Allowance Summary through August 31, 2011
2011-2012 EMISSIONS ALLOWANCE SUMMARY
SO2 NOx
Allowance
Allowance Sale Sale
Date Action Rev.1 Allocation2 Rev.
Allocation Price Price
Seas. Ann.
N/A 2003-2006 139 0 0
Carryover
1/1/08 2007 Carryover 549 0 0
1
Revenue calculations account for a $0.50/ton broker fee for SO2, a $10/ton broker fee for annual NOx
and $1/ton broker fee for seasonal NOx
2
Per Clean Air Interstate Rule (CAIR), starting in 2009, NOx emissions are governed by a seasonal and
annual program.
11
Paj 27
1/1/09 2008 Carryover 2,691 0 0
1/1/09 2009 Allocation 2,723 53 80
2/1/10 2010 Allocation 1,988 50 78
1/1/11 2011 Allocation 1,988 49 76
4/1/11 2011 Reallocation 2 5
9/29/09 SO2 Sales (1,500)
11/12/09 NOx Ann. Sales (45)
11/13/09 SO2 Sales (1,410)
11/20/09 NOx Seas. Sales (25)
12/31/09 2009 Emissions3 (1) (6) (13)
12/31/10 2010 Emissions 0 (54) (54)
10/31/10 EPA Linearity (68) (68)
Testing Req.
2011 2010 Deficit NOx 53 22
Purchases
Aug 2011 Revised 2010 30 30
ECMPS data
8/31/11 2011 Emissions (2) (32) (36)
Pre-CAIR:
3,189
TOTAL ALLOWANCES - $0 52 74 - $0
CAIR:
3,976
TEA’s estimate, given current dispatch expectations, for the market value of the
remaining CAIR allowance inventory is approximately $9,231 as of September 20, 2011.
This represents $1,595 for 3,189 pre-CAIR SO2 allowances trading at $0.50/ton, $1,988
for 3,976 CAIR SO2 allowances trading at $0.50/ton, $5,180 for 74 annual NOx
allowances trading at $70.00/ton and $468 for 52 seasonal NOx allowances trading at
$9.00/ton.
EMISSIONS & ALLOWANCE SUMMARY THROUGH AUGUST 31, 2011
Cumulative
Emissions Allowances
Cumulative Annual
Allowance Allowance for sold in Allowance
Annual Allowances
Vintage Allocation August August Balance
Emissions Sold
2011 2011
(Purchased)
SO2: 2007- 10,157 N/A 131 N/A 4,847 5,179
10
SO2: 2011 1,988 0.1 2 0 0 1,986
NOx: Ann. 80 N/A 13 0 45 22
2009
NOx: Seas 53 N/A 6 N/A 25 22
2009
NOx Ann. 78 N/A 94.7** N/A (22) 8
3
Under CAIR, pre-CAIR SO2 allowances are retired at a rate of 2 allowances for each ton emitted. It is
assumed that pre-CAIR allowances will be retired before CAIR allowances.
12
Paj 28
2010
NOx Seas 50 N/A 94.7** N/A (53) 11
2010
NOx Ann. 80 25.5 38.8 0 0 44
2011
NOx Seas 51 25.5 36.1 0 0 19
2011
Note **: EPA approved petition to use lower emissions rate for NOx on McKee Run Unit 3 by
30 tons.
EPA Cross-State Air Pollution Rule or CSAPR
The final CSPAR was published in the August 8, 2011 Federal Register (76 FR 48208),
with an effective date of October 7, 2011. The first compliance period begins for annual
SO2 and NOx allowances on January 1, 2012. As mentioned in last month’s report,
CSAPR does not include compliance requirements or allowance allocations for
generating units located in Delaware and Dover will not be required to submit emission
allowances for annual SO2, annual NOx or Seasonal NOx for compliance years 2012 and
beyond.
While there continues to be the possibility of legislative and legal challenges to this new
rule, affected entities must assume it will become effective on the stated date and begin
complying with the rule.
As stated on the EPA Website, "EPA will remove CAIR allowances of vintage years
2012 and greater from all AMS accounts on Friday, October 14, 2011. Within 2 or 3 days
before this date, EPA will send an email to the designated representatives and authorized
account representatives of accounts that include these CAIR allowances and remind these
representatives of the scheduled removal of these CAIR allowances.
After removal of the vintage year 2012 and greater CAIR allowances, on Monday,
October 17, 2011, EPA will begin recording vintage year 2012 CSAPR allowance
allocations in compliance accounts of units as addressed in the notice of data availability
(NODA) published in the Federal Register on July 18, 2011. Unit-level CSAPR
allowance allocations, and the data upon which those allocations are based, can be
viewed at http://www.epa.gov/crossstaterule/techinfo.html.
The Clean Air Act Title IV provisions for SO2 will remain in effect and Dover, which
does not have significant SO2 emissions, will need to continue compliance with this
program.
SO2 and NOx
CAIR prices continue to be deflated because of over-supply, as shown on Figures 1
through 3. Markets are just beginning to form for CSAPR allowance prices and the
magnitude of CSAPR prices are significantly higher than recent CAIR allowance prices.
13
Paj 29
Figure 1 – SO2 Allowance Prices
6
5
4
$/Ton 3
2
1
0
Average of Wtd Avg Offer Price ($/ton)
Average of Wtd Avg Bid Price ($/ton)
Figure 2 – Seasonal NOx Allowance Prices
40
35
30
25
$/Ton 20
15
10
5
0
Average of Wtd Avg Offer Price ($/ton)
Average of Wtd Avg Bid Price ($/ton)
14
Paj 30
Figure 3 – Annual NOx Allowance Prices
400
350
300
250
$/Ton 200
150
100
50
0
Average of Wtd Avg Offer Price ($/ton)
Average of Wtd Avg Bid Price ($/ton)
RGGI and Federal Carbon Outlook
RGGI allowance prices continue to price at very low levels due to over-supply, dropping
to $1.86 as of September 20, 2011 which is below the reserve price of $1.89/ton. The
13th RGGI auction occurred on September 7th and cleared at the reserve price of $1.89,
with only 18% of the 2009-2011 control period allowances offered for sale actually being
sold in the auctions. TEA continues to monitor RGGI activities.
In Congress, there continues to be little movement on climate legislation. EPA continues
to pursue the “Tailoring Rule” which will impact new sources and Clean Air Act Title V
permitting existing source; however on September 15, 2011 EPA confirmed that it would
not meet a September 30 deadline for issuing rules governing greenhouse gas emissions
from power plants and other major sources.
EPA issued the Mandatory Reporting of Greenhouse Gases Rule (74 FR 56260) which
requires reporting of greenhouse gas (GHG) data and other relevant information from
large sources and suppliers in the United States. The purpose of the rule is to collect
accurate and timely GHG data to inform future policy decisions. The implementation
program for this rule is referred to as the Greenhouse Gas Reporting Program (GHGRP).
The deadline to submit 2010 reports is September 30, 2011. NAES has indicated it will
submit the report in a timely manner.
15
Paj 31
IV. Operations Management
NAES Corporation
Dover, Delaware
August 2011
Monthly Report
NAES Scholarship Award is presented to Lori Berryhill, daughter of
Operations Supervisor Lance Berryhill, by Plant Manager Vince Scire.
16
Paj 32
Table of Contents
1.0 Environmental, Health and Safety
2.0 Financial
3.0 Operations
4.0 Maintenance
5.0 CIP
6.0 General Plant Information
7.0 Summary of NAES Performance
17
Paj 33
1.0 Environmental, Health and Safety:
During the month of August, there were no restricted work days or lost time accidents.
The facility has now gone 321 days without an OSHA recordable accident or a Lost Time
reportable accident. The plant received no Notice of Violations (NOVs).
The facility submitted the revised 2010 Q3 & Q4 ECMPS data for Unit 3 which provided
the amended MER constants for emission calculation purposes. With the revised data, the
EPA was able to complete the annual NOx reconciliation for 2010. Utilizing the
amended MER constants, the facility emissions went from 119 NOx tons (allowances) to
89 NOx tons (allowances), a reduction 30 NOx emission allowances that were reported
emitted.
Work continues on addressing the Total Dissolved Solids (TDS) issue for Outfalls 004
and 005. In an effort to purse alternate and possibly less costly solutions to the handling
of cooling tower blowdown, preliminary discussions with the City of Dover Public
Works Department have opened the possibility of discharging the waste to the Kent
County Waste Water Treatment Plant (WWTP). This option could have the additional
benefit of removing the facility NPDES discharge permit (other than general storm water)
as well as from the DRBC docket requirements. Further discussions with the City as well
as with Kent County to develop this concept are scheduled to take place in September.
Environmental training was conducted across all teams to review and discuss the facility
emergency response plans (ERAP, SMP-2, SPCC, SWPPP, FRP), and specifically the
2011 Q1 and Q2 FRP exercises (Deployment Drill – Q1, Tabletop – Q2). Employee
feedback regarding the exercises has been positive and productive discussions have taken
place. An emphasis was put on the concept of the Incident Command System (ICS) and
how it may be utilized to enhance the facilities ability to respond to incidents of all types,
as well as interface with outside agencies and resources in an effective manner.
Environmental, Health and Safety Statistics
Month Fiscal Year to Date
(August) (7/1/11-6/30/12)
NOVs 0 0
Opacity Deviations 0 0
Environmental Deviations 0 3
OSHA Recordable 0 0
OSHA LTA's 0 0
First Aid cases 0 0
Restricted Workday Accident 0 0
Near Miss 0 1
Man Hours Worked 4,007.50 8,097.75
Date last OSHA Recordable 10/14/10
Date last Lost Time Accident 10/14/10
Days since last OSHA recordable 321
Days since last Lost Time Accident 321
18
Paj 34
Emissions (NOx & SO2) All data thru 8/31/11
NOx Summary - Year (May-Sept.)Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2009 0.9 0.7 4.2 0.6 6.4
2010 0.7 2.2 88.7 3.3 94.7
2011 1.8 1.5 31.4 1.4 36.1
NOx Summary - Year (Jan. – Dec.)Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2009 0.9 0.7 10.1 0.6 12.3
2010 0.7 2.2 88.7 3.3 94.7
2011 1.8 1.5 32.6 2.9 38.8
CAIR NOx Allowances Summary*
NOx Allowances
CAIR CAIR NOx Available Total NOx NOx Allowance Balance
CAIR NOx
NOx Allowances (Per Facility, Prior to Tons Emitted
Allowances
Allowance Sold YTD Sale) (Yr/ Season)
Purchased
Vintage McKee Run
VanSant YTD McKee Run VanSant
(Yr/Season) McKee Run -
(Yr/Season) (Yr/Season) (Yr/Season)
VanSant
2009 45/25 75/50 5/3 12/5 - 1/1 0/0 – 0/0 18/0 4/2
89**/89** - 22##/53# –
2010 0 73/47* 5/3 6/11 2/0
3/3 0/0
2011 0 75###/48### 5/3 33/31– 3/1 0/0 - 0/0 42###/17### 2/2
Note ** - EPA approved petition to use lower MER for NOx emissions.
Note# - 53 tons were purchased to help compensate for the shortage in seasonal NOx allowances.
Note## - 22 tons were purchased to help compensate for the shortage in annual NOx allowances.
Note###- 2 tons (Seasonal and 4 tons (Annual) were reallocated by the EPA to the McKee Run 2011
account.
SO2 Summary - Year (Jan.-Dec.)Tons
Year Unit #1 Unit #2 Unit #3 Unit #11 TOTAL
2009 0.05 0.05 0.1 0.2 0.4
2010 0.0 0.0 0.3 0.0 0.3
2011 0.0 0.0 0.1 0.5 0.6
Note: Data is as of 8/31/2011
19
Paj 35
SO2 Allowances Summary
SO2 Allowances Available Total SO2
SO2 (Per Unit, Prior to Sale & Tons Emitted SO2
SO2 Allowance Allowances Reconciliation) – Allowances
Vintage Sold - YTD U3 and U11 Balance
Unit #3 Unit #11 YTD
2003-2006 139 138 1 0 0
2007 2455 2585 138 98 170
2008 2392 2585 138 32 299
2009 0 2585 138 0 2723
2010 0 1850 138 0 1988
2011 0 1850 138 1 1987
Note: Data is as of 8/31/2011
CO2 Allowances Summary*
CO2 CO2 CO2 Allowances Available Total CO2 CO2
Allowance Allowances (Per Facility, Prior to Tons Emitted Allowance
Vintage Sold YTD Sale) Balance
McKee Run VanSant
2009 0 59,805 1,699 5,796 55,708
2010 0 47,844 1,636 32,971 16,509
2011 0 35,883 1,227 17,709 19,401
2012 0 23,922 818 0 24,740
2013 0 11,961 409 0 12,370
Note: All CO2 allowance values are provided by the RGGI CO2 Allowance Tracking System
20
Paj 36
2.0 Financial
Financial – Current Month (Estimated)
Month –August 2011
Actual Budget Variance
Personnel 217,325 278,125 60,800
Materials & Supplies 44,403 16,317 (28,086)
Administrative Expenses 131,097 137,578 6,481
Total $392,825 $432,020 $39,195
Financial – Fiscal Year to Date (Estimated)
Number of Months – 2
Actual Budget Variance
Personnel 432,845 556,250 123,405
Materials & Supplies 45,342 33,549 (11,793)
Administrative Expenses 517,552 559,156 41,604
Total $995,739 $1,148,955 $153,216
2.1 Variance analysis:
The actual expenses for August are $392,825 against a budgeted amount of $432,020 for a
favorable variance of $39,195 or ≈ 9.07%. The variance was due to the following:
PERSONNEL EXPENSES – A favorable variance of $60,800 was realized in the Straight
labor, Overtime, and Labor Burdens accounts due to several open staff positions.
Note: Included in this variance is a positive variance of $31,912 for the Employee Incentive
Accumulator and Employee Incentive Burden Accumulator that will occur every month. These
expenses were broken down into every month over the entire year, instead of having them
budgeted for June of 2012 when they would actually be expensed.
MATERIALS AND SUPPLIES EXPENSES- The account with any appreciable variance was
the Water and Sewer account which was higher than budgeted due to supporting unit operations
for an unfavorable variance of $28,086.
ADMINISTRATIVE EXPENSES – Lower than budgeted expenses in the areas of Electric,
Environmental Expenses, DCS Control Systems / Maintenance and Combustion Turbine
Maintenance contributed to a favorable variance of $6,481.
The current budget forecast for the current fiscal year is $5,917,031 expensed versus an approved
budget of $5,964,818 thereby realizing a 99.20%.expense rate.
21
Paj 37
3.0 Operations
Unit Operations / Outages / Trips
In the month of August, Units 3 and 11 were dispatched three times and once respectively
by PJM. During the month, Unit 11 also successfully completed the PJM Capacity Test
for the Summer Demonstration Period. Unit 11 was operated for the City of Dover during
Hurricane Irene to supply cranking power to McKee Run Unit 3 which was on hot
standby, in the event the City of Dover was disconnected from the Bulk Electric System.
Month – August 2011
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 0.0 0.0 35.416 35.416 18.649 54.065
Starts # 0 0 3 3 6 9
Gross Generation MWh 0.0 0.0 2,851.488 2,851.488 192.125 3,043.613
Net Generation MWh 0.0 0.0 2,645.084 2,645.084 191.907 2,836.991
Total Auxiliaries MWh 20.115 20.115 397.537 437.767 1.516 439.283
Auxiliaries purchased MWh 20.115 20.115 191.133 231.363 1.298 232.661
Fuel Gas Used MMBTU 10.274* 8.219* 29,791.822 29,791.822 4,235.904 34,027.726
Fuel Oil Used MMBTU 0.0 0.0 0.0 0.0 0.0 0.0
Fuel Oil Used Gallons 0.0 0.0 0.0 0.0 0.0 0.0
Total Fuel MMBTU 10.274* 8.219* 29,791.822 29,791.822 4,235.904 34,027.726
Net Heat Rate BTU/KWh 0.0 0.0 11,256 11,256 22,073 16,665
Unit Trips # 0 0 0 0 1 0
Capacity Factor % 0.0 0.0 3.49 2.61 0.66 2.18
Availability Factor % 100.00 100.00 100.00 100.00 100.00 100.00
Commercial
% 0 0 0 0 0 0
Unavailability (CU)
Planned Outage Hours Hours 0.0 0.0 0.0 0.0 0.0 0.0
Maintenance Outage
Hours 0.0 0.0 0.0 0.0 0.0 0.0
Hours
Forced Outage Hours Hours 0.0 0.0 0.0 0.0 0.0 0.0
Reserve Shutdown
Hours 744.000 744.000 708.584 2,196.584 725.351 2,921.935
Hours
HW Boiler Gas Usage MMBTU 0 0
Pilot Gas Usage MMBTU 139,333 139,333 277,667 277,667
# Note: Does not include HWB or Pilot Gas. Fuel usage numbers are taken from
fuel flow instruments.
* Indicates fuel used for testing high gas pressure trips on Units 1 & 2.
22
Paj 38
2011-2012 Fiscal Year-to-Date ( 2 Month )
McKee McKee McKee MRS VanSant Total
Unit 1 Unit 2 Unit 3 Facility Unit 11 All Units
Capacity MW 17 17 102 136 39 175
On Line Hours Hrs 59.234 57.267 236.585 353.086 53.600 406.686
Starts # 1 1 16 18 11 29
Gross Generation MWh 561.129 564.344 18,927.359 20,052.832 1,326.737 21,379.569
Net Generation MWh 532.006 521.173 17,544.644 18,597.823 1,325.755 19,923.578
Total Auxiliaries MWh 65.841 79.889 1,907.017 2,052.747 3.636 2,056.383
Auxiliaries purchased MWh 56.833 56.833 524.302 637.968 2.654 640.622
Fuel Gas Used MMBTU 8,554.933 7,620.677 194,854.408 211,030.018 19,347.263 230,377.281
Fuel Oil Used MMBTU 0.0 0.0 0.0 0.0 0.0 0.0
Fuel Oil Used Gallons 0.0 0.0 0.0 0.0 0.0 0.0
Total Fuel MMBTU 8,554.933 7,620.677 194,854.408 211,030.018 19,347.263 230,377.281
Net Heat Rate BTU/KWh 15,947 15,503 11,130 14,193 17,648 15,921
Unit Trips # 0 0 0 0 1 0
Capacity Factor % 0.85 0.83 4.35 3.47 0.93 2.90
Availability Factor % 100.00 100.00 100.00 100.00 100.00 100.00
Commercial
% 0 0 0 0 0 0
Unavailability (CU)
Planned Outage Hours Hours 0.0 0.0 0.0 0.0 0.0 0.0
Maintenance Outage
Hours 0.0 0.0 0.0 0.0 0.0 0.0
Hours
Forced Outage Hours Hours 0.0 0.0 0.0 0.0 0.0 0.0
Reserve Shutdown
Hours 1,428.766 1,430.733 1,251.402 4,110.901 1,434.400 5,545.301
Hours
HW Boiler Gas Usage MMBTU 0 0
Pilot Gas Usage MMBTU 139,333 139,333 277,667 277,667
Fuel Oil Inventory
Monthly Monthly Fuel Monthly FY 11-12 Fuel FY 11-12
Inventory Inventory Purchases Inventory Inventory Purchases Inventory
(Start) (End) (Month) (Change) (Start) (YTD) (Change)
McKee Run
(#2 Fuel Oil) 455,606 455,606 0 0 454,725 0 881
VanSant
153,549 152,453 0 1,096 153,212 0 1,096
(#2 Fuel Oil)
Note: As measured by tank level instruments. Tank levels may change due to oil temperature.
23
Paj 39
VanSant Lifetime through 8/31/11
Actual Starts Factored Starts Fired Hours
VanSant 1275 2202.45 4184.66
Since HGP - Dec 2004 216 534.75 801.08
Team Report:
Plant employees continue General Physics safety training and environmental courses to
enhance their overall knowledge of permit and safety requirements. As the GPI courses
are being completed the employee reviews the standard operating procedure (SMP) for
the same topic they are training on to review NAES policy as well.
During the month of August, Operations staff successfully completed the PJM Capacity
Test on Unit 11 for the Summer Demonstration Period.
Operations personnel continue to support maintenance by working on Preventative
Maintenance (PM) work orders and other work orders that they have the necessary skills
to successfully complete the task. The Operations Department continues to utilize the
Flex Team in both Operations and Maintenance areas to help in maintaining the plant.
Capacity Testing – FY 2010-2011
Summer 2011 (June 1- Aug 31) Winter 2011-2012 (Dec 1- Mar 1)
Unit Rated Net Reported Net Unit Rated Net Reported Net
Capability (MW) Capability (MW) Capability (MW) Capability (MW)
1 17 17.06 1 17 *
2 17 17.67 2 17 *
3 102 102.31 3 102 *
VanSant 39 39.07 11 39 *
Total 175 176.11 Total 175 175
Note: * Denotes Unit is qualified for the PJM Winter Demonstration Period Exemption Program
24
Paj 40
4.0 Maintenance
During the month of August, plant maintenance staff continued addressing the backlog of
work orders. There were fifty work orders issued with seventy-eight work orders being
completed during the month. The table below summarizes the monthly work order
activities.
Work Order Report
August - 2
Outstanding
From Outstanding
Previous Issued This Completed at the end of
Priority # Month Month This Month the month
1 21 5 13 13
2 41 4 20 25
3 48 0 13 35
4 6 0 0 6
5 3 18 0 21
SW1 0 0 0 0
SW2 0 0 0 0
SW3 0 0 0 0
SW4 0 0 0 0
SW5 0 0 0 0
PM 49 23 32 40
Totals 168 50 78 140
Note: PMs are included in the priority totals
Notable activities during the month include:
1) Maintenance staff completed the cleaning of the lube oil tank sump pit. The staff
pumped out the fluid from the sump tank and cleaned out the remaining residue
and debris. The staff then properly labeled all the drums and stored them in the
Used Oil Storage room in preparation for the next scheduled disposal pick-up.
2) Maintenance staff completed the removal of 2B Circulating Water Pump (CWP)
and motor. The motor was removed, blocked up securely and was placed into
temporary storage while the pump is being repaired. The pump was removed and
blocked up while waiting for the repair contractor to arrange pick-up of the
equipment. The pump will undergo a thorough inspection so that a work scope
may be developed and the pump repaired to address any identified discrepancies.
3) IC& E Staff completed repairs on the security camera system and the main gate
call button when the plant experienced a lighting strike. A new multiplexer and
power supply for the camera system was installed to correct the problems with the
25
Paj 41
camera security system. A new call button was installed to correct the problem
with the call button at main entrance to the plant.
4) IC&E staff assisted with the capacity test for Unit 11. During the start up of the
gas turbine, the unit experienced a problem with the flame detection system. The
scanners were fogging up during the ramp up of the unit. The staff cleaned the
scanners and put the scanner back into service. Once the scanners were cleaned
and the unit warmed up in the firing mode, the fire scanners had no more issues.
5) IC&E Staff completed the repairs on the air conditioning system for Units 1 & 2
elevator control room. The staff was able to troubleshoot the problem and avoided
any interruption of control services that are housed in the control room. The room
houses controls for elevator and essential radio base stations from different
organization including the COD and the Delaware State Police.
26
Paj 42
5.0 Capital Improvement Projects (CIP)
Project
Description Update
Number
Units 1 & 2 Cooling Progress: The scope of work is being planned for 2011-2012.
EG1102 Tower Life
Extension Schedule: Work planned for this fiscal year is in development
Progress: This project is to assess and determine the actions
necessary to prolong the life of Units 1 and 2. Repair costs based on
Units 1 & 2 Life turbine inspection results will have to be developed and supplied to
EG1107
Extension the City of Dover in order to make a decision on how and when to
proceed. The plant is still waiting on estimated costs from Siemens.
Schedule: Planning for 2011-2012 fiscal year has started.
Progress: The 2011 work was completed on the expansion joint.
Unit 3 Air Heater
EG1112 Schedule: The 2012 scheduled work is expected to be completed by
Expansion Joint the end of January 2012
Progress: The 2011 work was completed on the expansion joint.
Units 1 & 2 Controls
EG1113 Schedule: The 2012 scheduled work will be completed by the end of
Modifications Fiscal year.
Progress: The 2011 Fall work scope has been developed and bids
Unit 3 Gas Line are being evaluated.
EG1114
Modification Schedule: The scheduled work is expected to be completed by the
end of January 2012.
Progress: Started on the development of the project work scope
Unit #3 Boiler Air
EG1201 documents.
Heater Schedule: Planning for 2011-2012 fiscal year has started.
Progress: Started on the development of the project work scope
Unit #3 Boiler
EG1202 documents.
Systems
Schedule: Planning for 2011-2012 fiscal year has started.
Progress: Started on the development of the project work scope
Unit 3 FD & ID Fan
EG1203 documents.
Damper Upgrade
Schedule: Planning for 2011-2012 fiscal year has started.
Unit 3 DCS Progress: Started on the development of the project work scope
EG1204 Computers & documents.
Software Upgrades Schedule: Planning for 2011-2012 fiscal year has started.
Progress: This project is for the unexpected needs that may occur
Miscellaneous during a budget year that were unexpected due to equipment failure
EG1205 Capital Equipment for example.
Replacements Schedule: The funding is in place and there are no capital items
identified at this time to go into this project fund.
McKee Run DI Progress: Started on the development of the project work scope
EG1206 Controls documents.
Replacement Schedule: Planning for 2011-2012 fiscal year has started.
27
Paj 43
Progress: Started on the development of the project work scope
VanSant Component
EG1207 documents.
Replacements
Schedule: Planning for 2011-2012 fiscal year has started.
McKee Run Progress: Started on the development of the project work scope
EG1208 Switchyard Blast documents.
Walls Schedule: Planning for 2011-2012 fiscal year has started.
McKee Run Progress: Started on the development of the project work scope
EG1209 Structural documents.
Preservation Schedule: Planning for 2011-2012 fiscal year has started.
Unit #3 Cooling Progress: Started on the development of the project work scope
EG1210 Tower Line documents.
Inspection Schedule: Planning for 2011-2012 fiscal year has started.
Progress: Development of the work scope is in the process of
EG1211 Unit 3 Stack Repairs commencing.
Schedule: Planning for 2011-2012 fiscal year has started.
Progress: Plant Staff and NAES Turbine Services are working to
Unit 3 Turbine finalize the work scope and specification and out for bids by the end
EG1212
Inspection of October.
Schedule: Planning for 2011-2012 fiscal year has started.
Progress: Started on the development of the project work scope
Unit 3 Auxiliary
EG1213 documents.
System Components
Schedule: Planning for 2011-2012 fiscal year has started.
5.1 CIP Budget
Approved
Latest
Budget
Project Number Description Estimate
($ X
($ X 1000)
1000)
Units 1 & 2 Cooling Tower Life
EG1102 199 136
Extension
EG1107 Units 1 & 2 Life Extension 409 409
EG1112 Unit 3 Air Heater Expansion Joint 135 135
EG1113 Units 1 & 2 Controls Modifications 150 145
EG1114 Unit 3 Gas Line Modification 60 57
EG1201 Unit #3 Boiler Air Heater 440 440
EG1202 Unit #3 Boiler Systems 130 130
EG1203 Unit 3 FD & ID Fan Damper Upgrade 92 92
EG1204 Unit 3 DCS Computers & Software 85 85
28
Paj 44
Upgrades
Miscellaneous Capital Equipment
EG1205 70 70
Replacements
EG1206 McKee Run DI Controls Replacement 65 65
EG1207 VanSant Component Replacements 50 50
EG1208 McKee Run Switchyard Blast Walls 50 50
EG1209 McKee Run Structural Preservation 38 38
Unit #3 Cooling Tower Line
EG1210 25 25
Inspection
EG1211 Unit 3 Stack Repairs 25 25
EG1212 Unit 3 Turbine Inspection 348 348
EG1213 Unit 3 Auxiliary System Components 113 113
6.0 General Plant Information
Training:
Environmental training was conducted across all teams to review and discuss the facility
emergency response plans (ERAP, SMP-2, SPCC, SWPPP, FRP), and specifically the
2011 Q1 and Q2 FRP exercises (Deployment Drill – Q1, Tabletop – Q2). Employee
feedback regarding the exercises has been positive and productive discussions have taken
place. An emphasis was put on the concept of the Incident Command System (ICS) and
how it may be utilized to enhance the facilities ability to respond to incidents of all types,
as well as interface with outside agencies and resources in an effective manner.
Additionally, a new practice has been identified and will be incorporated into the facility
bulk unloading procedures. Employees will now be required to review the delivery
vehicle safety features and pertinent safety/environmental documentation prior to the
commencement of unloading activities.
Plant employees continue General Physics safety training and environmental courses to
enhance their overall knowledge of permit and safety requirements. As the GPI courses
are being completed the employee reviews the standard operating procedure (SMP) for
the same topic they are training on to review NAES policy as well.
Personnel:
29
Paj 45
NAES Scholarship awards were presented to Kayla, daughter of Operator II Eric Carrow
and Lori Berryhill, daughter of Operations Supervisor Lance Berryhill. Kayla is starting
her sophomore year at Wilmington College and is majoring in elementary education. Lori
will be starting her sophomore year at High Point University and is majoring in criminal
justice.
On August 25th, Mike Shane received a NAES Service Recognition Award from Vincent
Scire, Plant Manager, in recognition of completing 10 years of service working at the
City of Dover Generating Facilities.
Calendar of Events Date
McKee Run and VanSant Title V Semi-Annual Certification Due August 1, 2011
NOx Ozone Season Ends September 30, 2011
One Year Accident Free October 14, 2011
Units 1, 2, 3 and 11 Fall Outage October 3 to December 2, 2011
Winter Capacity Period December 1, 2011 to February 28, 2012
McKee Run and VanSant Title V Annual Certification Due February 1, 2012
NOx Emissions Reconciliation Due March 1, 2012
SO2 Emissions Reconciliation Due March 1, 2012
SARA III Report March 1, 2012
Annual VanSant Black Start Test March , 2012
Units 1, 2, 3 and 11 Spring Outage TBD
Air Emission Inventory April 1, 2012
McKee Run Title V Permit Renewal April 20, 2012
EIA-860 Report April 29, 2011
Units 1, 2, and 3 Spring Outage TBD
NOx Ozone Season Starts May 1, 2012
EIA-923 Report May 6, 2012
Fiscal Year 2011-2012 Ends June 30, 2012
PJM Summer Capacity Test Period June 1, 2012- August 31, 2012
Toxic Release Inventory (TRI) Annual Report July 1, 2012
30
Paj 46
7.0 Summary of NAES Performance to Date
Plant Performance FY 2011-2012
Measure Month Year to Date YTD FY Maximum
Incentive Incentive
Commercial
0% 0 $91,198 $91,198
Unavailability (CU)
Safety 0 0 $17,099 $17,099
Environmental 0 0 $17,099 $17,099
Capacity Tests
Summer Winter Summer Winter
Completed
Unit 1 No No Yes Yes $3,420 $3,420
Unit 2 No No Yes Yes $3,420 $3,420
Unit 3 No No Yes Yes $20,520 $20,520
Unit 11 Yes No Yes Yes $6,840 $6,840
Total YTD
100.00% Total YTD Incentive $159,597 $159,597
Incentive %
Note: Units 1, 2, 3 and 11 PJM Summer Capacity Tests have been successfully completed and would be
entered into the PJM Winter Capacity Test Exemption Program. The YTD Incentive calculation reflects
this information.
31
Paj 47
V. Appendix
PJM Invoice Breakdown
PJM Bill Summary August 2011
Gen Load Grand Total
Auction Revenue Rights (68,699.41) (68,699.41)
Balancing Operating Reserve (14,951.54) 31,265.59 16,314.05
Balancing Spot Market Energy (4,026.43) (118,708.35) (122,734.78)
Balancing Transmission Congestion 779.62 4,465.87 5,245.49
Balancing Transmission Losses 425.40 (4,529.51) (4,104.11)
Black Start Service (6,111.93) 1,665.18 (4,446.75)
Day-ahead Operating Reserve (4,306.04) 8,093.43 3,787.39
Day-ahead Scheduling Reserve (4,741.95) 3,690.20 (1,051.75)
Day-ahead Spot Market Energy (264,349.61) 747,504.89 483,155.28
Day-ahead Transmission Congestion (14,087.16) 58,435.35 44,348.19
Day-ahead Transmission Losses (6,758.49) 194,015.74 187,257.25
Expansion Cost Recovery 408.58 408.58
FERC Annual Recovery 4,188.29 4,188.29
Generation Deactivation Refund (741.04) (741.04)
Inadvertent Interchange 5,152.41 5,152.41
Load Reconciliation for Balancing Operating Reserve (8.63) (8.63)
Load Reconciliation for FERC Annual Recovery (2.27) (2.27)
Load Reconciliation for Inadvertent Interchange 0.85 0.85
Load Reconciliation for Market Monitoring Unit (MMU)
Funding (0.20) (0.20)
Load Reconciliation for North American Electric Reliability
Corporation (NERC) (0.35) (0.35)
Load Reconciliation for PJM Scheduling, System Control
and Dispatch Service (8.62) (8.62)
Load Reconciliation for PJM Scheduling, System Control
and Dispatch Service Refund 0.16 0.16
Load Reconciliation for Reactive Services (29.88) (29.88)
Load Reconciliation for Regulation and Frequency
Response Service (13.25) (13.25)
Load Reconciliation for Reliability First Corporation (RFC)
32
Paj 48
(0.53) (0.53)
Load Reconciliation for Schedule 9-6 - Advanced Second
Control Center (0.59) (0.59)
Load Reconciliation for Spot Market Energy (2,574.74) (2,574.74)
Load Reconciliation for Synchronized Reserve (21.99) (21.99)
Load Reconciliation for Transmission Congestion (1,187.98) (1,187.98)
Load Reconciliation for Transmission Losses (60.92) (60.92)
Load Reconciliation for Transmission Owner Scheduling,
System Control and Dispatch Service (3.00) (3.00)
Locational Reliability 716,582.05 716,582.05
Market Monitoring Unit (MMU) Funding 240.59 240.59
Meter Error Correction (5,001.83) (5,001.83)
Network Integration Transmission Service 270,969.76 270,969.76
Non-Firm Point-to-Point Transmission Service (1,004.35) (1,004.35)
North American Electric Reliability Corporation (NERC) 647.20 647.20
Organization of PJM States, Inc. (OPSI) Funding 46.13 46.13
PJM Scheduling, System Control and Dispatch Service -
Advanced Second Control Center 1,018.62 1,018.62
PJM Scheduling, System Control and Dispatch Service -
Capacity Resource/Obligation Mgmt. 1,036.02 1,036.02
PJM Scheduling, System Control and Dispatch Service -
Control Area Administration 13,018.69 13,018.69
PJM Scheduling, System Control and Dispatch Service -
Market Support 3,038.02 3,038.02
PJM Scheduling, System Control and Dispatch Service -
Market Support Offset (440.17) (440.17)
PJM Scheduling, System Control and Dispatch Service -
Regulation Market Administration 195.56 195.56
PJM Scheduling, System Control and Dispatch Service
Refund - Capacity Resource/Obligation Mgmt. (76.57) (76.57)
PJM Scheduling, System Control and Dispatch Service
Refund - Control Area Administration (1,115.90) (1,115.90)
PJM Scheduling, System Control and Dispatch Service
Refund - Market Support (265.33) (265.33)
PJM Scheduling, System Control and Dispatch Service
Refund - Regulation Market Administration (16.08) (16.08)
PJM Settlement, Inc. 440.17 440.17
Reactive Services 61,572.67 61,572.67
Reactive Supply and Voltage Control from Generation
and Other Sources Service (29,467.58) 31,998.27 2,530.69
Regulation and Frequency Response Service 27,364.98 27,364.98
33
Paj 49
Reliability First Corporation (RFC) 981.97 981.97
RPM Auction (592,549.50) (592,549.50)
Synchronized Reserve 8,606.31 8,606.31
Synchronous Condensing 100.22 100.22
Transmission Enhancement 14,547.77 14,547.77
Transmission Losses (57,589.79) (57,589.79)
Transmission Owner Scheduling, System Control and
Dispatch Service 5,527.37 5,527.37
Balancing Operating Reserve for Load Response 0.01 0.01
Load Reconciliation for Organization of PJM States, Inc.
(OPSI) Funding (0.03) (0.03)
Load Reconciliation for Day-ahead Scheduling Reserve (20.66) (20.66)
Emergency Load Response 893.10 893.10
Peak-Hour Period Availability 215,846.40 215,846.40
Grand Total $(724,298.81) $1,955,590.05 $1,231,291.24
34
Paj 50
FUND SUMMARY
Total Collected
$ 689,206.24
DEMEC Admin Fee Paid $ 18,312.19
State Admin Fee Paid $ 13,987.88
Grants Paid $ 391,212.50
Grants/Fees Reserved and Amount Owed $ 284,163.36
Energy Depot Paid $ 31,519.82
Efficiency Programs Paid $ 34,068.34
*Funds Available $ (84,057.85)
* As of 10/11/2011
GRANTS PAID
Grant Amount Review Fee Amount
Date Grant Paid Applicant Type
Paid Paid Owed
9/21/2007 Laura Drew Kelly Geo - Res $ 3,000.00 $ 225.00 $ -
12/5/2007 Domingo Reye Solar - Res $ 12,762.50 $ 750.00 $ -
4/16/2008 Lakeland Commercial Group Geo - Comm $ 10,800.00 $ 750.00 $ -
6/19/2008 & 08/25/2008 L.D. Shank - Triad Farms Solar - Comm $ 30,000.00 $ 750.00 $ -
10/6/2008 City of Dover Solar - Comm $ 40,820.00 $ 750.00 $ -
10/21/2008 Robert & Cynthia Hartman Geo HP- Res $ 1,800.00 $ 135.00 $ -
10/21/2008 Robert Varipapa Geo HP- Res $ 2,400.00 $ 180.00 $ -
2/27/2009 David Jump Solar - Res $ 15,000.00 $ 750.00 $ -
2/27/2009 Jakob Seren Solar - Res $ 15,000.00 $ 750.00 $ -
2/27/2009 William Sweet Solar - Res $ 15,000.00 $ 750.00 $ -
3/31/2009 LD Shank - Triad Farms Solar WH-Comm $ 3,000.00 $ 225.00 $ -
3/31/2009 Warren & Joan Seaver Geo HP- Res $ 3,000.00 $ 225.00 $ -
4/22/2009 William Sweet Solar HW $ 3,000.00 $ 225.00 $ -
4/28/2009 State of DE/DNREC - DE Solar - Comm $ 30,000.00 $ 750.00 $ -
4/29/2009 Delaware Primary Care, LLC Solar - Comm $ 30,000.00 $ 750.00 $ -
9/11/2009 NCALL Solar - Comm $ 30,000.00 $ 750.00 $ -
9/11/2009 D. Brian Beckman Geo HP- Res $ 2,000.00 $ 150.00 $ -
9/21/2009 LKSC Dover, LLC Kids Cottage Solar - Comm $ 29,925.00 $ 750.00 $ -
10/5/2009 Mark F. Boller Geo HP- Res $ 3,000.00 $ 225.00 $ -
10/5/2009 John Welgan Solar - Res $ 15,000.00 $ 750.00 $ -
11/4/2009 LKSC Dover, LLC Kids Cottage Geo - Comm $ 12,000.00 $ 750.00 $ -
3/25/2010 Minaxi Patel Solar - Res $ 15,000.000 $ 750.000 $ -
3/23/2010 J. McGiffin Jr. & K. Doyle Geo HP- Res $ 3,000.000 $ 225.000 $ -
5/28/2010 Nancy Warner Geo HP- Res $ 1,200.000 $ 90.000 $ -
6/2/2010 David Teel Geo HP - Res $ 1,800.000 $ 135.000 $ -
6/2/2010 Dewey J. Barich Geo HP- Res $ 2,400.00 $ 180.000 $ -
7/12/2010 Mike & Sharonb Laverty Solar - Res $ 5,105.000 $ 382.880 $ -
8/19/2010 James Grilli Geo HP- Res $ 1,800.00 $ 135.000 $ -
8/19/2010 Michael Noble Solar - Res $ 15,000.000 $ 750.000 $ -
9/17/2010 David Teel Solar - Res $ 7,500.000 $ - $ 562.500
3/8/2011 Michael & Carol Apgar Solar - Res $ 7,500.000 $ - $ 562.500
3/17/2011 Elizabeth Murphey School Geo HP - Comm $ 9,200.000 $ - $ 690.000
5/24/2011 Richard Avant Geo HP - Res $ 2,400.000 $ - $ 180.000
6/23/2011 Charles Messina Plumbing Solar - Comm $ 10,000.000 $ 750.000
10/4/2011 Charles Bounds Geo HP - Res $ 1,800.000 $ - $ 135.000
Paj 51
Arturo Sanchez Solar - Res $ - $ 562.500
Application paid by the ARRA
Relief Program
$ -
Total $ 391,212.50 $ 13,987.88 $ 3,442.50
PENDING APPLICATIONS
Grant
Date Reserved Applicant Type
Reservation
3/20/2009 City of Dover Geo HP $ 185,190.86
1/27/2010 Pat's Pizzeria Solar - Comm $ 30,750.000
1/17/2011 Pat's Pizzeria Hot Water - Comm $ 10,750.000
3/29/2011 Psychiatric Access Central DE Solar - Comm $ 13,937.500
7/8/2011 Michael J. Kopp Geo - Res $ 2,472.500
7/11/2011 Ruth Ann Piper Geo - Res $ 1,290.000
7/15/2011 Robert Hall Geo - Res $ 3,225.000
9/1/2011 Elizabeth Murphey School Geo - Res $ 14,550.000 Bradford Bldg
9/1/2011 Elizabeth Murphey School Geo - Res $ 12,750.000 Florence Bldg
9/1/2011 Elizabeth Murphey School Geo - Res $ 5,805.000 Elizabeth Bldg
$ 280,720.86
ENERGY DEPOT FEES
3/3/2008 Start-up Fees $5,872.50
4/15/2008 Start-up Fees $1,957.50
4/15/2008 Mar, Apr, May 2008 $1,692.13
7/22/2008 June, July, Aug 2008 $1,692.13
10/10/2008 Sept, Oct, Nov 2008 $1,692.13
1/2/2009 Dec 08, Jan, Feb 2009 $1,692.13
4/3/2008 Mar, Apr, May 2009 $1,692.13
7/1/2009 June, July, Aug 2009 $1,692.13
9/11/2009 Sept, Oct, Nov 2009 $1,692.13
1/4/2010 Dec 09, Jan, Feb 2010 $1,692.13
3/29/2010 Mar, April, May 2010 $1,692.13
6/30/2010 June, July, Aug 2010 $1,692.13
10/4/2010 Sept, Oct, Nov 2010 $1,692.13
1/3/2011 Dec 2010, Jan, Feb 2011 $1,692.13
4/5/2011 Mar, Apr, May 2011 $1,692.13
7/8/2011 June, July, Aug 2011 $1,692.13
Total Paid $31,519.82
ENERGY EFFICIENCY CAMPAIGNS/EDUCATION PROGRAMS
1,500 CFL Campaign &
10/21/2008 Educational Literature $5,012.29
12/11/2008 Reimbursement for Green $3,459.12
Thermal Imager for Home Audits
3/31/2009 Program $5,581.12
Eco @ Home Energy Conserv.
1/4/2011 Calendars $20,015.81
Total $34,068.34
Paj 52
MEMORANDUM
Department of Planning and Community Development
P.O. Box 475
Dover, Delaware 19903
Phone: 302.736.7196 Fax: 302.736.4217
Date: October 20, 2011
To: Utility Committee
From: Ann Marie Townshend, AICP
RE: NPDES Permit for Municipal Separate Storm Sewer System (MS4)
As you are aware from previous discussions, the City of Dover has a permit through the National Pollution Discharge
Elimination System (NPDES) for our Municipal Separate Storm Sewer System (MS4). This permit was issued by the
Department of Natural Resources and Environmental Control (DNREC) in 2003for a five-year period. The permit has
been administratively extended by DNREC until all requirements of the permit are met and a new permit is in place.
Under the permit, the City is required to take action to improve the quality of stormwater runoff within the City.
Since the initiation of the permit, the City has struggled with compliance. In June 2010, the responsibility for managing
the permit was transferred from Public Services to Planning. Also on June 2, 2010, the City received a Notice of
Violation (NOV) relating to a number of permit requirements that had not been met. This NOV was closed out in
November 2010, when the terms of that NOV were met. DNREC subsequently performed an audit of the City’s MS4
permit in early 2011, and in June 2011, DNREC reported the results of that audit and issued another NOV. This NOV
related to outstanding permit requirements that were not addressed in the NOV issued in June 2010. The NOV issued in
June 2011 includes a number of required corrective actions that must be complete by December 31, 2011.
With the leadership of Michael Albert and assistance from the Watershed Assessment Section at DNREC and Wesley
College Environmental Science Program, the City is making great strides in moving toward compliance with the permit
requirements. This fall, the Wesley College Environmental Science Program provided an intern to help with the
outstanding tasks associated with the Notice of Violation, including development of a Storm Water Management Plan for
2012-2015. The Environmental Science students are also working to develop a number of public outreach materials that
will be implemented under the Storm Water Management Plan that will begin in January 2012.
Tasks completed in recent months include:
Marking of storm drains in the downtown area and throughout the State Complex;
Development of a brochure for the general public about non-point source pollution;
Completion of a survey regarding attitudes about water quality;
Development of a poster regarding proper automotive care that was distributed to all automotive businesses in the
City of Dover;
Insertion of an auto maintenance fact sheet into utility bills;
Continued progress on storm sewer system mapping.
In addition, I have received the State’s Certified Construction Reviewer certification. Sharon Duca and I will be providing
training to all City road staff and their supervisors on best management practices to protect water quality. The City’s new
website also includes information on the Stormwater Program, as required by the permit.