Yo rale tèks sa a nan PDF la otomatikman, epi li ka gen erè. PDF la se dosye ofisyèl la, kidonk tcheke l anvan ou konte sou sa a.
4 paj pa gen anpil tèks ou ka li isit la, oswa yo pa gen ditou, souvan paske se eskanè oswa desen. Gade PDF la pou sa yo.
Paj 1
PARKS, RECREATION, AND
COMMUNITY ENHANCEMENT COMMITTEE
The Parks, Recreation, and Community Enhancement Committee Meeting was held on
October 10, 2011, at 12:00 p.m. with Mr. Hare presiding in the absence of Mrs. Russell. Members
present were Mrs. Horsey and Mr. Lewis. Mr. Anderson was absent.
AGENDA ADDITIONS/DELETIONS
Mrs. Horsey moved for approval of the agenda, seconded by Mr. Lewis and unanimously
carried.
Presentation - Foster Care Treatment Services Provided by Pressley Ridge
Ms. Cha-Tanya Lankford, Pressley Ridge Program Director, provided a presentation,
“An Introduction to Pressley Ridge,” (Attachment #1) and stated that her intent was to give members
a brief overview of the background, purpose, and function of the organization, which provides
treatment foster care (TFC) services. She explained that Pressley Ridge has two (2) foundational
beliefs: 1) children matter, and 2) we can make a difference, and noted that every service provided
by the organization is based on these beliefs. She provided historical information regarding the
founding of the organization and explained that it has evolved throughout the years to meet the needs
of children and families served.
Mrs. Lankford explained that Pressley Ridge originally provided residential and educational services;
however, programs today include residential treatment services, treatment foster care services,
community-based services, education services, international programs and services, and the Pressley
Ridge Institute, which is the organization’s research arm. Pressley Ridge’s principal purpose is to
place children with trained foster care families in homes that provide stability and structure, with
permanency and reunification as the primary goal for each child. She noted that many children that
are referred to Pressley Ridge have had 12-14 placements before they come to the organization.
Mrs. Lankford reviewed information regarding intermediate and long-term goals established and
achieved by children served by the organization and their families. She stated that Pressley Ridge
provides services in the Dover community, has foster homes in City neighborhoods, and has clients
who are presently attending local schools.
In response to Mr. Lewis, Ms. Lankford stated that Pressley Ridge does not have a local residential
facility but places children in family settings that meet their needs. She explained that the caseload
for staff members is between eight (8) and ten (10) children and that each child is treated by a
treatment coordinator, supervisor, licensed social worker, therapist, psychiatrist, and trained foster
parents. All foster parents receive 40 hours of initial training and 30 additional hours of training
each year for dealing with children with behavioral problems.
Responding to Mr. Lewis, Ms Lankford stated that Pressley Ridge is constantly recruiting foster care
homes and has homes set aside and waiting for children.
In response to Mrs. Horsey, Ms. Lankford noted that there are six (6) other foster care organizations
in the State and that Pressley Ridge accepts referrals from these organizations.
Paj 2
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 10, 2011 PAGE 2
Ms. Lankford encouraged members to consult Pressley Ridge’s newly updated website for further
information and to contact her if they have any additional questions.
Neighborhood Stabilization Program (NSP) Partnership with Habitat for Humanity
Mrs. Tracy Harvey, Community Development Manager, advised members that the Community
Development Office was requesting to establish a Neighborhood Stabilization Program (NSP)
Partnership with Central Delaware Habitat for Humanity (CDHFH). She explained that this request
was due to the Dover Housing Authority (DHA) Board of Commissioners’ decision to decrease their
participation in the NSP program as part of DHA’s plan to restore financial viability to their
organization. Mrs. Harvey felt that CDHFH would be an asset to the city’s NSP program due to their
successful record in providing homeownership to the low-income population. She stated that
CDHFH provides affordable homes with monthly mortgage payments that are lower than the rents
typically charged for two (2) or three (3) bedroom apartments.
Mrs. Havey indicated that, as part of the NSP, the DHA purchased four (4) properties and sold
two (2). Of the remaining properties, one (1) is occupied under a lease-purchase arrangement, and
the other, located on Hancock Avenue, has been renovated and is for sale. Once these properties are
sold, DHA’s partnership with the City under the NSP will be dissolved.
Mrs. Harvey noted that CDHFH has an excellent track record in providing homeownership in Dover,
with 14 houses built within City limits, all of which are occupied. The organization recently
purchased and renovated the property at 101 Jefferson Court and sold it to a low-income family that
was previously living in a shelter. She noted that approximately $205,000 remains in the NSP line
of credit, which would be used for CDHFH to purchase and renovate a property to sell to a
qualifying family. Mrs. Harvey explained that the organization’s qualifying criteria and selection
process for families is very structured, and they have provided permanent homeownership solutions
to over 100 adults and children throughout Kent County since they have been in existence. She
explained that CDHFH holds the mortgages for all houses that they renovate or construct.
In response to Mr. Lewis, Mrs. Ann Marie Townshend, Director of Planning and Community
Development, indicated that the City has partnered with CDHFH on a number of previous projects,
including the renovation of 101 Jefferson Court under the Community Development Block Grant
(CDBG) Program. Mr. Neaton, Economic Development Director, indicated that CDHFH worked
with the City on the ABC = 123 Program, which involved performing minor renovations and
clean-up in the Downtown Dover area. Mrs. Harvey indicated that CDHFH has an NSP relationship
in Sussex County that has been very successful.
Responding to Mr. Hare, Mrs. Harvey explained that the $205,000 that remains in the City’s NSP
fund consists of the City’s allocation from the NSP as well as proceeds from homes already sold.
The initial grant received from NSP was in the amount of $1.5M, and all but $205,000 has been
expended. She stated that when the three (3) remaining homes are sold, the proceeds will go into
the line of credit and will be used to purchase additional homes.
Mrs. Townshend explained that when the City went forward with the NSP, it was determined that
the City did not want to own/manage properties or hold mortgages in connection with the program.
For this reason, the City partnered with other agencies to perform this function, and the City received
Paj 3
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 10, 2011 PAGE 3
grant funds and distributed them to these agencies, who purchase, maintain, repair, and sell
properties. She indicated that, as houses sell, the City receives program income from these sales,
which is returned to the fund. All funds generated by the sale of these properties will be dedicated
to the NSP until 2013. After 2013, remaining funds will be allocated to Community Development
Block Grant (CDBG) projects. Mrs. Townshend explained that the NSP was established as
foreclosure rates began to rise in an effort to prevent foreclosures from becoming a blight on the
community and to turn them into affordable homeownership opportunities.
In response to Mr. Hare, Mrs. Harvey confirmed that all housing projects undertaken as a result of
the partnership with CDHFH would be within the City of Dover.
Mrs. Horsey moved to recommend that Council approve the Neighborhood Stabilization
Program (NSP) partnership between the City and the Central Delaware Habitat for Humanity,
seconded by Mr. Lewis and unanimously carried.
Proposed Ordinance #2011-25 - Amendment to Appendix B - Zoning, Article 3 - District
Regulations, Section 17 - Shopping Center Development [(SC-1, SC-2 and SC-3)], Subsection
17.3 - Permitted Uses (Relating to Neighborhood Shopping Center Zone)
Mrs. Ann Marie Townshend, Director of Planning and Community Development, reviewed Proposed
Ordinance #2011-25, which would amend the SC-1 (Neighborhood Shopping Center) zone to permit
retail and service establishments and specify that gas pumps would be permitted in this zone as an
accessory use subject to conditional use approval. The proposed ordinance would prohibit
wholesaling; warehousing; storage; and motor vehicle service, sales, and/or fueling stations in this
zoning classification. Mrs. Townshend stated that, in order to determine the impact of this change,
staff reviewed the properties within the City that are currently zoned SC-1, which include the former
Playtex Plant at the northwest corner of Route 8 and Route 13, the Hamlet Shopping Center at the
corner of Walker and Saulsbury Roads, the Dover Downs Shopping Center (location of Best Buy),
and Route 8 Plaza (location of Talbots). She indicated that this type of use was not deemed to be
out of character for these properties.
In response to Mr. Hare, Mrs. Townshend explained that the need for the proposed ordinance became
apparent when an initial land use plan was being considered for the property at the location of the
former Playtex Plant at the corner of Route 8 and Route 13, noting that the plan involved
consideration of gas pumps as an accessory use at that location. Because this was not a permitted
use under the current zoning, staff concluded that it was more appropriate to amend the zoning text
to add this as an accessory use than to approach it through the rezoning process, since it was
determined that this type of use was not incongruous with the areas surrounding all City properties
with this zoning designation.
Mrs. Townshend explained that, before development, a site plan would be reviewed by the Planning
Commission and a conditional use application for the gas pumps would be required. Conditions
could be attached to such an application, including buffering or other protections. She noted that
notifications would be sent to property owners within 200 feet and physical posting on the property
would also be required.
Paj 4
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 10, 2011 PAGE 4
Mrs. Horsey stated that she agreed with the inclusion of the terms “accessory use” and “conditional
use,” which she stated added two (2) protections in the ordinance. She felt that the amendment
appeared to be a correction to the Code and it was logical to implement the change by ordinance
rather than rezoning the individual properties affected to “get around” the existing ordinance.
Responding to Mr. Hare, Mrs. Townshend stated that the Playtex property was formerly zoned
Industrial Park Manufacturing; however, its current designation is Neighborhood Shopping Center.
She noted that the property was rezoned in 2009 as result of the City’s comprehensive rezoning. She
recalled that the current designation was the result of a specific request from a realtor who was
working with Playtex to market the property at the time.
Mr. Lewis expressed concerns regarding the “carbon footprint” left by designating such an accessory
use and the potential need to clean up the property if the type of use were to change in the future.
In response to Mr. Hare concerning notification of the residents of Bayard Avenue, Mrs. Townshend
reiterated that all property owners within 200 feet of the property would be notified and notice of the
proposed change would also be posted on the property.
Staff recommended that members recommend adoption of Proposed Ordinance #2011-25.
Mrs. Horsey moved to recommend adoption of Proposed Ordinance #2011-25 amending
Appendix B - Zoning, Article 3 - District Regulations, Section 17 - Shopping Center
Development [(SC-1, SC-2, and SC-3)], Subsection 17.3 - Permitted Uses (Relating to
Neighborhood Shopping Center Zone) (Attachment #2), as recommended by staff, seconded
by Mr. Lewis and unanimously carried.
Proposed Ordinance #2011-26 - Amendment to Appendix B - Zoning, Article 5 -
Supplementary Regulations, Section 1 - Supplementary Regulations Applying to Residence
Zones and Section 7 - Supplementary Regulations Applying to All Non-Residential Zones
(Relating to Corner Lots)
Mrs. Ann Marie Townshend, Director of Planning and Community Development, reviewed
Proposed Ordinance #2011-26. She advised members that, based on the definition of a “front yard”
in the Zoning Ordinance, corner lots have two (2) front yards, one (1) along each street frontage. The
Zoning Ordinance limits the height of a fence in a front yard to four (4) feet. This means that
property owners of corner lots are restricted in their ability to install a privacy fence to fence in what
many residents would consider a back yard.
Mrs. Townshend stated that the proposed ordinance would clarify that corner lots have two (2) front
yards; permit such lots in residential zones to have a fence of up to 6½ feet in height in the front yard
that is along the side of the principal structure; permit such lots in non-residential zones to have a
fence of up to eight (8) feet in height in the front yard that is along the side of the principal structure;
and designate which yard on corner lots shall function as the side and rear yards. Additionally, the
proposed ordinance would clarify that residential lots with dual frontages would be permitted to have
fences of up to 6½ feet in height situated in the yard to the rear of the principal structure and
Paj 5
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 10, 2011 PAGE 5
non-residential lots with dual frontages would be permitted to have fences of up to eight (8) feet in
height situated in the yard to the rear of the principal structure.
Mrs. Townshend reviewed a series of diagrams depicting the provisions of the proposed ordinance
as they would apply to the designation of front yards and rear yards and fence height restrictions for
dual frontage residential and non-residential lots (Attachment #3). She noted that the intent of the
proposed Code amendment was to correct language in the zoning ordinance that frequently leaves
the City at odds with residents who apply for permits for privacy fencing.
In response to Mr. Hare, Mrs. Townshend stated that, currently, property addresses are determined
by the street on which the principal structure fronts; however, there is a “legacy” of side yards being
used for that purpose and residents are resistant to changing these addresses.
Staff recommended that members recommend adoption of Proposed Ordinance #2011-26.
Mr. Lewis moved to recommend approval of Ordinance #2011-26 - amending Appendix B -
Zoning, Article 5 - Supplementary Regulations, Section 1 - Supplementary Regulations
Applying to Residence Zones and Section 7 - Supplementary Regulations Applying to All
Non-Residential Zones (Relating to Corner Lots) (Attachment #4), seconded by Mrs. Horsey
and unanimously carried.
Benchmarks Established for the Economic Development Office
Mr. Bill Neaton, Economic Development Director, reviewed a semi-annual update regarding the
progress of the Economic Development Office (EDO) toward meeting its established benchmarks.
He advised members that the EDO has two primary objectives: 1) to support the efforts of the
Downtown Dover Partnership (DDP) (Mr. Neaton serves as the Executive Director of the DDP) and
promote downtown business growth; and 2) to promote City-wide economic development. Mr.
Neaton reviewed the FY 2010-2011 Strategic Accomplishments of the EDO, as follows:
Downtown Dover Partnership and Downtown Dover Business Growth
In regard to the DDP and Downtown Business Growth, Mr. Neaton noted that the DDP participated
in 19 events in Downtown Dover during FY 2010-2011. A new chairperson of the Organization
Committee was elected and fundraising letters were distributed. The goal of completing a merchant
satisfaction survey in the downtown area was accomplished with nearly 100% participation and an
above average rating was achieved.
In reviewing the goals relating to downtown business growth, Mr. Neaton noted that the DDP
recently established a $50,000 loan fund to assist downtown businesses in purchasing inventory,
remodeling, etc. He indicated that a committee of bankers has been established to review
applications for this program and make recommendations to the DDP. Mr. Neaton anticipated that
the awarding of these loans would assist area businesses to stay in operation and prosper. He
indicated that the goal of working with potential property owners to fill vacant commercial buildings
on Loockerman Street was an ongoing process, as many of these properties are not in conformance
Paj 6
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 10, 2011 PAGE 6
with Code. Mr. Neaton stated that the EDO is working with owners to improve properties as part
of the aforementioned loan program.
In regard to Fiscal Year 2010-2011 strategic accomplishments related to the DDP, Mr. Neaton
explained that one of the initiatives of the DDP was to develop a recruitment strategy to attract new
businesses to the downtown area. He noted that a Recruitment Subcommittee, chaired by
Mr. Anthony DePrima, former City Manager, has been established for this purpose and Mr. DePrima
has developed a group of realtors and developers to collaborate on this effort and has put a work plan
in place. In regard to the property at 22-24 W. Loockerman Street (“the C. Moore building”),
Mr. Neaton stated that the DDP is currently in the process of accepting bids for the renovation of this
property and conducting meetings with bidders and Becker Morgan Group to develop cost-saving
strategies for retrofitting the building. A Request for Proposals (RFP) has been issued for legal,
architecture and engineering (A&E), and landscaping aspects of the project and the DDP approved
Becker Morgan Group as the landscape and A&E firm and Street & Ellis as the law firm.
Mr. Neaton noted that preliminary plans for the project would be submitted to the City on
October 14, 2011.
City-Wide Economic Development
Mr. Neaton noted that the City’s unemployment rate has remained at or below the State’s
unemployment rate and has decreased over the past year. He stated that the EDO continues to follow
up with 12 small businesses and ten (10) out-of-town companies that were contacted to encourage
locating in the City.
In regard to Fiscal Year 2010-2011 Strategic Accomplishments Related to City-Wide Economic
Development, Mr. Neaton advised members that completion of a site development master plan for
the Garrison Tract and development of an overall marketing plan for the site were major tasks
performed by the EDO and that Calpine Corporation has a current lease on Lot #7 at the site. He
explained that the original tenant, Macquarie Energy, sold their interest to Calpine, and Calpine is
currently awaiting an impact study from Pennsylvania, Jersey, Maryland Interconnection (PJM)
before proceeding. He noted that the State of Delaware set aside $3M for infrastructure
improvements at the Garrison Tract, and these improvements are also pending receipt of the impact
study. Mr. Neaton stated that he spoke with Secretary Alan Levin, Delaware Economic
Development Office, who indicated that there was no requirement for matching funds to be
committed for this project, although Mr. Neaton indicated that Calpine has committed to
matching funds to assist with infrastructure improvements. Mr. Neaton stated that he met with
Secretary Collin O’Mara, Department of Natural Resources and Environmental Control, and
Secretary Levin regarding the promotion of the Garrison Tract to renewable energy manufacturers
outside the State.
Mr. Neaton stated that, approximately one (1) week ago, Delaware State University was awarded
a $500,000 grant to enhance economic development strategies in central Delaware and that
Dr. Michael Casson, Assistant Professor of Economics, plans to work in partnership with the City’s
EDO to use these funds to promote development in Dover. Mr. Neaton planned to attend a
Paj 7
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 10, 2011 PAGE 7
follow-up meeting with Dr. Casson and Dr. Harry Williams, President, Delaware State University,
to determine how to proceed. Mr. Neaton noted that he works with the presidents of all higher
educational institutions in the City on a regular basis.
In response to Mr. Lewis, Mr. Neaton stated that two (2) businesses closed in the Downtown Dover
area last year. He stated that a new tenant would soon occupy the former Hunter House restaurant
and that a restaurant specializing in salads will be opened at the location of the former downtown
shoe store.
Responding to Mr. Lewis, Mr. Neaton stated that the projection of less than 10% unemployment in
2011-12 was based on the struggling national economy and a desire to set a realistic goal for the
City.
At the request of Mr. Hare, Mr. Neaton stated that a list of all vacant commercial buildings in the
City could be developed. He noted that information is currently maintained for all vacant buildings
over 20,000 S.F. and vacant buildings in the Rt. 13 corridor. He also agreed to develop a list of
businesses that have been contacted to encourage locating in Dover, including the types of businesses
and their responses.
Mr. Lewis moved to accept the Economic Development Office (EDO) report, seconded by
Mrs. Horsey, and unanimously carried.
UPDATES
Planning and Funding for the New Library
Mr. Zachary Carter, Director of Parks and Recreation, advised members that a “Topping Off of the
Steel” Ceremony has been scheduled for October 20, 2011 at 5:00 p.m. Library donors will be
invited to sign a steel beam located inside the building. He stated that M & T Bank will sponsor this
event and provide refreshments.
Mr. Carter noted that, on October 19, 2011 at 5:00 p.m., the Fordham Brewing Company will hold
a Fall Festival in conjunction with the release of a new product and a portion of the funds received
will be donated to the Dover Library Foundation. Tickets for this event are currently on sale at the
Dover Library, the Fordham Brewing Company, and the Dover Newsstand at a cost of $10 for adults
and $5 for children.
Mr. Carter stated that a grant has been prepared for submission to ING Direct, who provided funding
for the new library during the previous year and subsequently encouraged the City to reapply.
Artisans’ Bank also suggested that a grant request be submitted for the project. Mr. Carter stated that
a new committee, the “Next Generation Committee” has been formed as part of the library’s Capital
Campaign Committee. The Next Generation Committee has set a goal of raising $100,000 for the
privilege of naming the storytime room in the new library facility.
Paj 8
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING OF OCTOBER 10, 2011 PAGE 8
Mr. Carter noted that an official ribbon cutting will be held for the new Job Center at the
existing Dover Public Library on October 14, 2011 at 12:00 noon. Governor Jack Markell and
Senator Chris Coons were planning to attend and a tour of the new library construction site will be
offered to a limited number of attendees.
Mr. Carter stated that construction of the new library was proceeding; the concrete for the first,
second, and third floors had been poured; and more than 90% of the structural steel was in place.
Within the next two (2) weeks, brickwork will begin and, within the next month, drilling will begin
for geothermal wells.
CDBG Program
Mrs. Tracey Harvey, Community Development Manager, stated that the funding approval agreement
for the release of FY 2011 Community Development Block Grant (CDBG) funds was approved by
the Mayor on July 21, 2011. All sub-recipient contracts were signed by mid-August and all projects
were underway.
In response to Mr. Hare, Mrs. Harvey explained that the City serves as a “pass-through” for the
majority of program funds, but the Street Repair Project and Housing Rehabilitation Programs were
City projects.
Mrs. Horsey moved to accept the report, seconded by Mr. Lewis and unanimously carried.
Housing and Recovery Act of 2008 funds (Neighborhood Stabilization Fund)
This information was provided during the discussion of Agenda Item #2, Neighborhood Stabilization
Program (NSP) Partnership with Habitat for Humanity.
Mr. Lewis moved for adjournment, seconded by Mrs. Horsey and unanimously carried.
Meeting adjourned at 1:18 P.M.
William F. Hare
Acting Chairman
WFH/JS/dd/tm
S:\AGENDAS & MINUTES\Committee-Minutes\2011\10-10-2011 PR&CE.wpd
Attachments
Attachment #1 - Presentation - “An Introduction to Pressley Ridge”
Attachment #2 - Proposed Ordinance #2011-25 - Amending Appendix B - Zoning, Article 3 (Relating to Neighborhood
Shopping Center Zone)
Attachment #3 - Diagrams Depicting the Provisions of Proposed Ordinance #2011-26
Attachment #4 - Proposed Ordinance #2011-26 - Amending Appendix B - Zoning, Article 5 (Relating to Corner Lots)
Paj 9
ATTACHMENT #1
PR&CE Committee Meeting of 10/10/2011
10/19/2011
An Introduction to
Cha-Tanya Lankford, LCSW
Program Director
An Introduction to Pressley Ridge
TFC Services
Presentation Outline:
I. History
II. Mission / Values
III. Model of Care
IV. Services
V. Re-Education
VI. Pressley Ridge- Delaware
VII. Delaware Specific Outcomes
VIII. Question/Answer
1
Paj 10
10/19/2011
Beginnings
Pressley Ridge traces it’s beginnings to
two orphanages started in the 1800’s.
◦ The Protestant Orphan Asylum of Pittsburgh
and Allegheny – opened in 1832.
◦ The Pittsburgh and Allegheny Home for the
Friendless – opened in 1861.
Beginnings
In 1866, The Protestant Home for
Children moved to a new building in
Allegheny City on Ridge Avenue.
Also in 1866, the Home for the Friendless
moved to a new building named “Pressley
House” on Pressley Street.
2
Paj 11
10/19/2011
Years of Traditional Services . . .
The Protestant Home and the Home for
the Friendless continued to operate as
traditional orphanages into the 1950’s.
In 1955, Pressley House was reorganized
as a residential treatment center for
emotionally disturbed children ages six to
twelve.
The Next Steps . . .
In 1957, the Marshall Avenue property
was purchased and cottage-style
residences were built.
Pressley House provided residential
treatment, educational services, foster
care and day care programs.
A special education day-school was built
in 1965.
3
Paj 12
10/19/2011
Next Steps . . .
In 1966, the Protestant Home began
serving emotionally disturbed children
ages 12 to 15, and also provided
psychiatric and psychological consultants
and caseworkers.
Can you see where this is leading . . . .
The Merger
In 1969, the two institutions merged and
took the name Pressley Ridge School.
By 1973, all educational and residential
services were moved to the Marshall
Avenue campus.
The Pressley Ridge board continued to
explore innovations in services to
troubled children. The Re-Education
philosophy was adopted.
4
Paj 13
10/19/2011
Continued Growth
Through the 1970’s, 80’s & 90’s Pressley
Ridge continued to add programs and
expand services:
◦ 1975 – The Ohiopyle Wilderness School
◦ 1981 – PRYDE Therapeutic Foster Care
◦ 1983 – Residential and Foster Care service
expand in Pennsylvania and West Virginia
◦ TFC services expand to Maryland (1988), Ohio
(1990), Washington, DC (1998), Portugal (1999),
Delaware (2003), Hungary (2006) and Texas
(2007)
Changing Names
In 1985, the name was change to Pressley
Ridge Schools to reflect the diversification
of programs and locations.
In 2004, the name was simplified to
Pressley Ridge.
In 2008, Pressley Ridge merged with
Family and Children’s Services of Central
Pennsylvania adding many new, unique
programs to the organization.
5
Paj 14
10/19/2011
Pressley Ridge Programs Today
Residential Treatment Services
Treatment Foster Care
Community-based Services
Education Services
International Programs & Services
The Pressley Ridge Institute
Our Mission
To improve the adjustment and achievement
of children & youth with troubling behaviors
through effective programs that focus on all
aspects of their lives.
To lead in the development of innovative
programing through evaluation, research and
outcome measurement.
To champion initiative to improve the system
of care for children , youth and their families.
6
Paj 15
10/19/2011
Re-ED is our Foundation-
Our Values
Nicholas Hobbs
Six Re-Education Value Statements:
◦ Idealism is Imperative
◦ Relationships are Paramount
◦ Joy in Our Work is Essential
◦ Re-ED is our Foundation
◦ We Strive for Quality – Nothing Less than the
Best
◦ We are All Teachers and We are All Learners
Re-ED is our Foundation
Twelve Re-ED Principles
1. Life is to be lived now; 7.Feelings should be nurtured;
2. Trust is Essential; 8. The group is very important;
3. Competence makes a difference; 9. Ceremony & ritual give order;
4.Time is an ally; 10. The body is the armature of
self;
5.Self-control can be taught; 11. Communities are important;
6. Intelligence can be taught; 12. Know some joy in each day;
7
Paj 16
10/19/2011
Pressley Ridge- Model of Care
Pressley Ridge- Delaware
The beginning
Services in Delaware began Spring 2003
Luke McDonough, MS came from Pressley
Ridge Day School in Pittsburgh and began
the program from his home in Magnolia,
DE
Introduced to Delaware to provide
specific Individualized Residential
Treatment (IRT) services for youth in care
8
Paj 17
10/19/2011
Initial IRT Services
IRT was a structured program with
specific requirements of parents:
◦ Preferred two parent homes;
◦ Preferred one parent not work and primary
role was as the care taker of the IRT youth;
Next Chapter
Cha-Tanya Lankford, LCSW began
September 2005; charged with increasing
census & programming capacity
Luke McDonough returned to Pittsburgh
Program experienced continued growth
in 2005 and 2006
◦ 2005- 18 youth and approximately 23 homes
to 45 youth and 70 homes
9
Paj 18
10/19/2011
Growth Spurt
February 2007 new contract entered into
with DFS to provide Treatment Foster
Care (TFC) services;
◦ Increased Levels of Care (LOC) of TFC that
included Level IV & V
◦ Resulted in continual recruitment and
certification efforts
Expansion
2008 marked by continued growth
Expanded and opened two additional
offices in the state- one office servicing
each County (New Castle & Sussex);
Growth continued throughout 2008 &
2009
10
Paj 19
10/19/2011
The Recession of 2009
January 2009 the State of Delaware hit
with the great financial crisis;
The Delaware TFC programs felt the hit
via a dramatic decrease in referrals and
placements;
Census peaked at 90 youth and 120 TFC
homes throughout the state;
Stabilization
2010 – 2011 Programs and services have
begin to level off;
Today serve approximately 65 youth/year
75 TFC homes located throughout the
state;
11
Paj 20
10/19/2011
Going Forward
• Seeking to provide specialty services in
the state; Take advantage of the niche
treatment needs of the state (juvenile sex
offenders)
• Increase community based services
• Continue community based outreach
• Seeking additional financial streams:
• Medicaid Billing
Delaware Outcomes - Immediate
Outcomes Benchmark Delaware Results Service Line
Score Result
Goal 1: Feel better about 80% 87%
family sit/life (based on
Satisfaction Survey
Results)
Goal 2: Hopefulness in 80% 100% 69%
future quality of life
(based on Follow Up
Interview Results)
12
Paj 21
10/19/2011
Delaware Outcomes - Intermediate
Outcomes Benchmark Delaware Results Service Line
Score Result
Goal 1: Individuals 80% 87%
manage their behavior
and relationships with
family and peers (based
on Satisfaction Survey
Results)
Goal 2: Successfully 80% 82% 90%
Manage Behavior at
Follow‐Up (based on
Follow Up Interview
Results)
Delaware Outcomes – Long Term
Outcomes Benchmark Delaware Results Service Line
Score Result
Goal 1: Obtain 90% 91%
Permanency/Stability
(based on the # of
internal transfers that
occurred in the program)
Goal 2‐Indicator I: 80% 77% 90%
Improvement in
Permanency and
Stability at Discharge
(based on the living
environment at
discharge)
13
Paj 22
10/19/2011
Delaware Outcomes – Long Term cont’d.
Outcomes Benchmark Delaware Results Service Line
Score Result
Goal 2‐Indicator II: 80% 93%‐Less Less LE ‐83%
At follow up, youth will restrictive LE
continue to live in a less No Moves‐85%
restrictive placement 71%‐No Moves
and experience no since d/c
moves.
Goal 3: Improvement in 80% 74%
Functioning (Well‐being)
(CAFAS)
Indicator I‐ improvement
in CAFAS/PECFAS scores
at d/c
Delaware Outcomes – Long Term cont’d.
Outcomes Benchmark Delaware Results Service Line
Score Result
Goal 4: Achieve Safety 80% 100% 98%
At Follow‐up, youth will
be free from harm or
victimization
Goal 5: Educational 80% 82% of them were 95% of them
Functioning ‐ Youth will attending school were attending
be attending school, or had graduated school or had
receiving good grades or graduated
67% of those
will have graduated.
attending school 70% of those
reported attending school
receiving good reported
grades receiving good
grades
14
Paj 23
10/19/2011
Questions?
Pressley Ridge TFC
Cha-Tanya Lankford, LCSW
Program Director
846 Walker Road
Suite 32-1
Dover, DE 19904
302-677-1590 office
302-677-1591 fax
302-423-5072 cellular
www.pressleyridge.org
Pressley Ridge- New Castle Co. Pressley Ridge- Sussex Co.
56 W. Main Street 20145 Office Circle
Suite 203 Unit 2
Newark, DE 19702 Georgetown, DE 19947
15
Paj 24
ATTACHMENT #2
PR&CE Committee Meeting of 10/10/2011
CITY OF DOVER PROPOSED ORDINANCE #2011-25
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
2 COUNCIL MET:
3 That Appendix B - Zoning, Article 3 - District Regulations, Section 17 - Shopping Center
4 Development [(SC-1, SC-2 and SC-3)], Subsection 17.3 - Permitted Uses, be amended by inserting
5 the text indicated in bold, blue, italics and deleting the text indicated in bold, red, strikeout as
6 follows:
7
8 17.31 In a neighborhood shopping center (SC-1), the following are permitted uses:
9 1. All uses permitted in the neighborhood commercial zone C-1, with no limitation on the
10 size of establishments;
11 2. Business, professional and governmental offices, public libraries, banks and restaurants.;
12 3. Retail and service establishments, subject to the following:
13 (a) The following uses shall be prohibited:
14 i. Wholesaling, warehousing, storage;
15 ii. Motor vehicle service, sales, and/or fueling stations.
16 (b) Gasoline pumps shall be permitted only as an accessory use and shall be subject
17 to conditional use approval by the planning commission in accordance with
18 Appendix B - Zoning, Article 10 - Planning Commission, Section 1 - Approval of
19 conditional uses.
20 ADOPTED: *
21 SYNOPSIS
22 The proposed ordinance would amend the SC-1 (Neighborhood Shopping Center)
23 zone to permit retail and service establishments, would specify that gas pumps would
24 be permitted only as an accessory use and would be subject to conditional use
25 approval, and would prohibit wholesaling, warehousing, storage, and motor vehicle
26 service, sales, and/or fueling stations.
27 Actions History
28 October 10, 2011 - Scheduled for consideration by the Parks, Recreation, and Community Enhancement Committee
29 S:\ORDINANCES\2011\Draft\Ordinance 2011-25 - Appendix B - Zoning, Article 3, Section 17, Relating to Permitted Uses Within the Neighborhood Shopping Center Zone.wpd
Paj 25
ATTACHMENT #3
PR&CE Committee Meeting of 10/10/2011
Paj 29
ATTACHMENT #4
PR&CE Meeting of 10/10/2011
CITY OF DOVER ORDINANCE #2011-26
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
2 COUNCIL MET:
3 That Appendix B - Zoning, Article 5 – Supplementary Regulations, Section 1 – Supplementary
4 Regulations Applying to Residence Zones, Subsection 1.3 – Corner Lots, be amended by
5 inserting the text indicated in bold, blue, italics as follows:
6 1.3 Corner lots.
7 1.31 Corner Visibility. In all zones within the city, no structure, fence, wall, landscaping,
8 earthen berm, sign or any other form of obstruction to visibility, in excess of three feet in
9 height above the adjacent street grade, shall be erected, placed or maintained on any
10 corner lot within the triangular area formed by intersecting right-of-way lines. Two sides
11 of the triangular area shall be 20 feet in length and measured from the point of
12 intersection of the right-of-way lines as further illustrated in figure 5-1.
13 1.32 Yard Requirements. Corner lots are considered to have two front yards. The rear
14 yard for a corner lot shall be the yard that is opposite the street upon which the
15 principal structure fronts. The side yard for a corner lot shall be the yard that is
16 opposite the street adjacent to the side of the principal structure.
17 1.33 Fences. A fence on a corner lot shall comply with the front yard requirement for
18 height along the street upon which the principal structure fronts. A fence on a corner
19 lot shall comply with the side yard requirement for height along the street adjacent to
20 the side of the principal structure.
21 BE IT FURTHER ORDAINED:
22 That Appendix B – Zoning, Article 5 – Supplementary Regulations, Section 1 – Supplementary
23 Regulations Applying to Residence Zones, Subsection 1.5 – Exceptions to Yard Requirements,
24 be amended by inserting the text indicated in bold, blue, italics and deleting the text indicated in
25 bold, red, strikeout as follows:
26 1.5 Exceptions to yard requirements.
27 1.51 Permitted obstructions. Cornice or cantilevered roofs and chimneys may project not
28 more than two and one-half feet into a required yard. Belt courses, windowsills and other
29 ornamental features may project not more than six inches into a required yard. Paved
30 terraces, steps, and walks (other than such as are needed for access to the buildings on the
31 lot) shall not project within 15 feet of a street line or four feet of a property line.
32 1.52 Entries and porticos. A roofed-over but unenclosed projection in the nature of an
33 entry, portico or awning not more than eight feet wide and extending not more than six
34 feet into the required front yard shall be exempt from the requirements of this section
Paj 30
Proposed Ordinance #2011-26 – Appendix B – Zoning, Article 5 Page 2
35 when the building otherwise complies with the regulations of this section. In computing
36 the average setback, the presence of such entries and porticos shall be ignored.
37 1.53 Existing setback. No proposed one-family or two-family dwelling need have a
38 setback greater than the average setback of the two existing dwellings with the greatest
39 setbacks within 200 feet on each side of the said proposed dwelling, on the same side of
40 the street and within the same block and the same zone.
41 1.54 Open decks. An open deck or patio extending to within ten feet of a rear lot line or
42 within 20 feet of a rear lot for second story decks shall be exempt from rear yard setback
43 requirements and lot coverage requirements so long as the principal structure complies
44 with the regulations. Such open decks or patios shall not be enclosed and used as a part of
45 the principal structure.
46 1.55 Fences. Fences or walls shall be limited to a maximum height of four feet above
47 the ground when situated within front yard areas, and shall be limited to a maximum
48 height of six and one-half feet above ground when situated within side and rear yard
49 areas. , except that corner lots shall comply with the more restrictive provisions of
50 article 5, section 1.31. Fences situated on corner lots shall be subject to the provisions
51 of article 5, section 1.3. For the purposes of this provision, on lots with dual street
52 frontage that are not corner lots, a fence situated to the rear of the principal structure
53 shall be limited to a maximum height of six and one-half feet above ground. Fences or
54 walls with a height in excess of six and one-half feet above ground shall conform to the
55 setback requirements for dwelling buildings as set forth in article 4 of this Appendix.
56 Fence material commonly referred to as "barbed wire" and/or "razor wire," or any similar
57 material, shall be prohibited in residential zones.
58 BE IT FURTHER ORDAINED:
59 That Appendix B – Zoning, Article 5 – Supplementary Regulations, Section 7 – Supplementary
60 Regulations Applying to All Non-Residential Zones, Subsection 7.5 – Fences, by inserting the
61 text indicated in bold, blue, italics and deleting the text indicated in bold, red, strikeout as
62 follows:
63 7.5 Fences. Fences or walls shall be limited to a maximum height of four feet above the
64 ground when situated within front yard areas, and shall be limited to a maximum height
65 of eight feet above [the] ground when situated within side and rear yard areas, except
66 that corner lots shall comply with the more restrictive provisions of article 5, section
67 1.31. Fences situated on corner lots shall be subject to the provisions of article 5,
68 section 1.3. For the purposes of this provision, on lots with dual street frontage that are
69 not corner lots, a fence situated to the rear of the principal structure shall be limited to
70 a maximum height of eight feet above ground. Fences or walls with a height in excess
71 of eight feet above [the] ground shall conform to the setback requirements for dwelling
72 buildings as set forth in article 4 of this Appendix. Fence material commonly referred to
Paj 31
Proposed Ordinance #2011-26 – Appendix B – Zoning, Article 5 Page 3
73 as "barbed wire" and/or "razor wire," or any similar material shall be prohibited along
74 property lines which adjoin residential zones.
75
76 ADOPTED: *
77
78 SYNOPSIS
79 The proposed ordinance would clarify that corner lots have two front yards;
80 permit such lots in residential zones to have a fence of up to six and one-half feet
81 in height in the front yard that is along the side of the principal structure; permit
82 such lots in non-residential zones to have a fence of up to eight feet in height in
83 the front yard that is along the side of the principal structure; and designate which
84 yard on corner lots shall function as the side and rear yards. Additionally, the
85 proposed ordinance clarifies that residential lots with dual frontages would be
86 permitted to have fences of up to six and one-half feet in height situated in the
87 yard to the rear of the principal structure and non-residential lots with dual
88 frontages would be permitted to have fences of up to eight feet in height situated
89 in the yard to the rear of the principal structure.
90 Action History
91 October 10, 2011 - Scheduled for Consideration by the Parks, Recreation, and Community
92 Enhancement Committee
93 S:\ORDINANCES\2011\Draft\Ordinance 2011-26 - Appendix B - Zoning, Article 5, Section 1, Relating to Corner Lots.docx