CITY OF DOVER PLANNING COMMISSION
JUNE 21, 2022
The Meeting of the City of Dover Planning Commission was held on Monday, June 21, 2022 at
7:00 PM as an In-Person Meeting and also using the phone/videoconferencing system WebEx.
The Meeting Session was conducted with Vice Chair Mr. Hartman presiding. Members present
were Mr. Cooper, Mr. Roach (virtual), Mrs. Denney, Mr. Hartman, Mr. Baldwin, Dr. Jones, Mrs.
Welsh (virtual). Mrs. Malone and Mrs. Maucher were absent.
Staff members present were Mrs. Dawn Melson-Williams, Mr. Julian Swierczek, Mr. Jason
Lyon (virtual) and Mrs. Kristen Mullaney. Also present were Mr. Brian Turner, Mr. Elio Baltista
Jr., Chief Judge Michael Newell, Mr. Bill Lenihan, Mr. James Taylor, Mr. John Rathfon and Mr.
Joseph Dopsovic.
APPROVAL OF AGENDA
Dr. Jones moved to approve the Agenda as submitted, seconded by Mr. Baldwin and the motion
was unanimously carried 7-0 with Mrs. Malone and Mrs. Maucher absent.
APPROVAL OF MEETING MINUTES OF APRIL 18, 2022
Mrs. Welsh moved to approve the Planning Commission Meeting Minutes of April 18, 2022,
seconded by Mr. Baldwin and the motion was unanimously carried 7-0 with Mrs. Malone and
Mrs. Maucher absent.
COMMUNICATIONS & REPORTS
Mrs. Melson-Williams provided an update on the regular City Council and various Committee
meetings held on April 25 & 26, 2022, May 9 & 10, 2022, May 23 & 24, 2022 and June 13 & 14,
2022.
Mrs. Melson-Williams stated that the next Planning Commission regular meeting is scheduled
for Monday, July 18, 2022 at 7:00PM in the City Hall Council Chambers. At this point, she is
not sure that we will be having this meeting and it will depend on if there is any business. They
have no new applications, but they haven’t officially cancelled that meeting yet.
Mrs. Melson-Williams stated that the City Manager has announced the selection of Mary Ellen
Gray as the next City Planner and to serve as the Director of Planning & Inspections. Her start
date is July 18, 2022 so they will certainly may sure that you have the opportunity to meet and
greet her. Mary Ellen has previously served as the Assistant Director in the Kent County
Department of Planning & Inspections and is currently serving as the Director in the City of
Newark.
Mrs. Melson-Williams stated that one of our previous Planning Commission members, Mr.
Ronald Shomo has passed away in recent weeks. He served as a Planning Commission member
for a three-year term that began in June 2010 through July 2013. Some of the people on the
Commission may remember Mr. Shomo. That was a gig in his retirement after serving as a Band
Director for the Capital School District for many years.
1
Paj 2
CITY OF DOVER PLANNING COMMISSION JUNE 21, 2022
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the In-
Person Meeting and Virtual Meeting using the WebEx system.
OLD BUSINESS
1) Requests for Extensions of Planning Commission Approval: None
2) Update on Revisions to Applications:
S-19-13 Office Building at 223 and 225 West Division Street - Update to Planning Commission
on Design Revisions to Site Development Plan Application S-19-13 Lands of NCALL at 223 &
225 West Division Street. This Application and Lot Consolidation Plan Application was initially
approved for the construction a three-story 7,671 SF office building together with associated site
improvements. The subject properties to be combined total 5,120 feet and are located north side
of West Division Street east of North New Street. The property is zoned C-1A (Limited
Commercial Zone). The owner of record is NCALL, Inc. Property Addresses: 223 West Division
Street and 225 West Division Street. Tax Parcels: ED-05-076.08-05-28.00-000 and ED-05-
076.08-05-29.00-000. Council District 4. This application received conditional approval by the
Planning Commission in July 2019 and a 1-year extension of approval in June 2021.
Representatives: Mr. Brian Turner, Mountain Consulting
Mr. Swierczek stated that this is an application for a Site Development Plan and Lot
Consolidation Plan that was recently before the Planning Commission in July 2019. It did
receive an extension of plan approval in the summer of 2021; so the plan is valid through July
2022. There is not necessarily any action required on the part of the Planning Commission this
evening. This is merely a courtesy update as they have revised their plans. Originally when this
came before the Planning Commission in 2019, this was a building of a little over 7,600 SF and
three stories. The original design was something more of a French Provençal aesthetic where as
now, it is a little bit more of a mission aesthetic. As this was a revision of the original design to a
smaller square footage and a reduction to the overall height of the building, this was not
necessarily requiring any specific action on the part of the Planning Commission. This
application had been approved with two waiver requests. One for the partial elimination of
upright curbing at the rear of the building where they are proposing a couple parking spaces and
a tree mitigation plan as this facility takes up the bulk of the site on West Division Street. They
are going to be planting their required two trees off-site at two other NCALL properties within
the City.
NEW APPLICATIONS
S-22-06 New Courthouse at South Governors Avenue and West Water Street – Public Hearing
and Review of a Site Development Plan Application, associated Lot Consolidation Plan, and
Architectural Review Certification to permit the construction of a five-story 106,711 GFA
government building to serve as the new Kent County Family Court. The proposal includes a
five-story Parking Structure (425 vehicle parking spaces), parking lot, and other site
improvements. The Site presently consists of a series of eleven (11) parcels consisting of a total
2
Paj 3
CITY OF DOVER PLANNING COMMISSION JUNE 21, 2022
of 3.7499 +/- acres and an alley. The properties are zoned IO (Institutional and Office Zone) and
subject to the SWPOZ (Source Water Protection Overlay Zone), as well as the H (Historic
District Zone). The properties are located on the east side of South Governors Avenue between
West Water Street and Bank Lane. The owner of record/ equitable owner is the State of
Delaware. Property Addresses: 401, 411, 429, 435, 439, 441, and 447 S. Governors Avenue; 101
and 117 West Water Street; 123 Bank Lane; and part of 34 The Green. Tax Parcels: ED-05-
077.09-03-32.00-000, ED-05-077.09-03-33.00-000, ED-05-077.09-03-35.00-000, ED-05-
077.09-03-36.00-000, ED-05-077.09-03-37.00-000, ED-05-077.09-03-48.00-000, ED-05-
077.09-03-50.00-000, ED-05-077.09-03-53.00-000, ED-05-077.09-03-52.00-000, ED-05-
077.09-03-61.00-000, and an alley. Future Addresses: 415 S. Governors Avenue (Parking
Garage), and 445 S. Governors Avenue (Courthouse). Council District 4. Project Site is subject
to the Architectural Review Certification Application HI-22-03 as reviewed and recommended at
the April 21, 2022 meeting of the Historic District Commission. For Consideration:
Architectural Review Certification, Tree Mitigation Plan. Waiver Request: Alternative Size of
Loading Spaces.
Representatives: Mr. Elio Baltista Jr., Parkowski Guerke and Swayze PA; Chief Judge Michael
Newell, Delaware Family Court; Mr. Bill Lenihan, Tevebaugh Architecture; Mr. James Taylor,
Duffield & Associates
Mrs. Melson-Williams stated that this is one of the bigger projects that we have seen in recent
times for a new Courthouse and an associated Parking Structure to be located on the east side of
South Governors Avenue in the block that is between Bank Lane and West Water Street. For the
image that is shown on the screen, West Water Street is at the bottom of the page and Bank Lane
would be at the top and then Governors Avenue kind of runs up and down vertically just to the
left of the two buildings shown in blue. It does consist of a number of tax parcels but in total, the
property area including an alley, will be 3.7499 acres. The properties are zoned IO (Institutional
and Office Zone) and are now all in the Historic District Zone thanks to a recent Rezoning
Application that brought the balance of the block into the Historic District. The properties are all
subject to the SWPOZ (Source Water Protection Overlay Zone); however, in this Downtown,
properties are exempt from certain provisions of that zoning designation. Tonight for
consideration, we will be dealing with an Architectural Review Certification. That is the review
process for something being constructed in the City’s Historic District Zone. That process started
in April with the application being reviewed by the Historic District Commission and as a result
of that, they have made a recommendation. For consideration, there is also a Request for Tree
Mitigation. Portions of this property are intended to be landscaped with tree plantings; however,
space is somewhat limited and they are seeking a Request to plant some of the required trees on
other State owned properties here in Dover. There is also a Waiver Request associated with the
alternative size of loading spaces. There is not a designated marked loading space. There is an
area that is located to the northeast side of the Courthouse Building. A little bit about the project
site; it does include a number of existing properties and there are several buildings that are
currently located on them that have been proposed for demolition and Demolition Permits have
been filed for those as part of a first phase of improvements to the site. As mentioned, the
Architectural Review Certification process began with the Historic District Commission. They,
like the Planning Commission, are charged with reviewing the project in concert with the Design
Standards and Guidelines for the City of Dover’s Historic District Zone. It looks at a number of
3
Paj 4
CITY OF DOVER PLANNING COMMISSION JUNE 21, 2022
things related to placing the building on the site and then the form and materials of the buildings
themselves. She does want to, by reference; note that there is a Recommendation Report that was
forwarded from the Historic District Commission from their April meeting and that is included in
the Planning Commission packet. Specifically, the Historic District Commission did recommend
approval of the Architectural Review Certificate for the application. They did note that they
recommend approval of an Alternative Bulk Standard related to the rear yard setback. There is a
portion of the Courthouse that was unable to meet the setback requirements but the Historic
District Commission is recommending that rear yard setback be reduced to a twenty-five foot
wide rather than a thirty foot one. They also, in their action on the Architectural Review
Certification Recommendation, recommended the use of fencing and it’s appropriate in areas
adjacent to the residential areas that adjoin this property. The Courthouse itself is a three-story L-
shaped building. Its main exterior is brick. There is also a variety of cast stone elements and
definition provided in size of openings and differences in the plain of the building. Likewise, the
Parking Garage structure is also brick. It is a series of parking decks that would allow for over
four hundred parking spaces within it. There is also included in the packet, additional
information about the design of the parking structure in that the parking spaces within it will be
slightly reduced in size from the standard parking space but they tend to follow typical parking
structure layouts. This would allow the building to remain the size that it is and its placement in
proximity to the street while still providing that significant number of parking spaces undercover.
Going back to the DAC Report and the review process related to the Zoning Ordinance, parking
is being provided in both the parking structure and then with the reconfiguration of a parking lot
that is located along West Water Street. The lower right-hand corner of the property is where the
parking lot will be, slightly reconfigured but generally the same portion of the location that there
is a parking lot today. The project is providing bicycle parking on site and the other requirements
related to street frontage sidewalks and sidewalks that lead into the site to access both buildings
and then also to connect both buildings. She did mention the tree planting requirement and the
Tree Mitigation Plan. Basically, the site is deficient twelve trees and the applicant believes that
they can certainly satisfy that tree planting deficit by accommodating those on other State-owned
properties located here within the City of Dover. Staff can work with them to ensure that the
mitigation occurs. Planning Staff is recommending approval of the Architectural Review
Certificate for the project and also the Tree Mitigation Plan. They do note that with this property
being adjacent to some residential properties, there are some requirements for opaque barriers. In
most cases, there is a fence component that will be implemented and where utilities are not in
conflict, either existing trees or new plantings will be implemented. They do plan for some
electrical vehicle charging stations as part of the project. It is not currently a requirement of our
Code, but they are taking that step. Additionally in the packet, is their Letter of Request. This
project did go through PLUS Review even though it is not required to given its location so that
PLUS Review Letter was also provided since it came in after the May distribution to you on this
project.
Mr. Baltista stated that as Mrs. Melson-Williams indicated, they are here with respect to the
proposed Kent County Family Courthouse, Parking Structure and adjacent lot. He would like to
begin by stating that this has been a long road going through this public process; he sees light at
the end of the tunnel and the Planning Office has been great working hand-in-hand with the
applicant in helping guide us through that process.
4
Paj 5
CITY OF DOVER PLANNING COMMISSION JUNE 21, 2022
Mr. Lenihan stated that Mrs. Melson-Williams did a great job of updating the Commission on
the project. They had great meetings with the Historic District Commission and the Development
Advisory Committee and they will continue to work with the Planning Office, the Fire Marshal’s
Office and all of the other DAC members as they develop the design and they will have
continuous administrative reviews with them on each of the components and regulations to make
sure that they are in compliance all the way through this project. As Mrs. Melson-Williams
mentioned, there were a few key items; one was the Tree Mitigation Plan that they have a game
plan for and they will continue to work with the Planning Department on that as they move
forward. They had several waivers. One was for the alternate size of the loading space. They had
that area on the back side of the Courthouse; it’s kind of a service yard area and adequately
accommodates the loading spaces in that area we just don’t have them specifically defined. Also,
with the parking space width, all of the surface parking spaces will meet the City of Dover
requirement of nine-foot-wide parking spaces but they are requesting for within the parking
structure only, to reduce the width to an 8.5 foot width. 8.5 foot is a standard width for parking
structures. Even some of the industry literature recommends that size width for these types of
parking structures and they recommend going with that because to increase the width, they
would also have to increase the height of the parking structure to accommodate the same amount
of vehicles to meet our parking demand that was stated in our parking study for the project. The
other one was the rear setback line because we are adjacent to a residential property at the rear of
the building for the width of the one yard there. They can only accommodate a twenty-five-foot
setback based on the requirements of the use groups within the building. They believe that they
are meeting the intent of that regulation of having enough space between an institutional building
and a residential property. The existing historic home is several hundred feet away from the
Courthouse and the property line; so, we feel that they are meeting the intent of that requirement
there by adjusting the setback only five feet. It was also mentioned about fencing, that the Code
has a requirement in the Historic District for four-foot-high fencing. We want to keep the four-
foot-high fencing in most areas but right behind our service area in the rear to cover and obscure
some mechanical equipment and also for security reasons, they are requesting to go to a six-foot-
high fence just in that area. They are asking for approval of the Architectural Review Certificate
that was recommended by the Historic District Commission.
Mr. Hartman opened the public hearing.
Mrs. Melson-Williams stated that there was one written piece of correspondence regarding the
application that was received from the Central Delaware Chamber of Commerce. It is a letter
dated April 22, 2022 signed by their President, Dina Vendetti who is in the room this evening.
They note their support of the Courthouse and parking garage project that is proposed at this
Downtown location.
Mr. Hartman closed the public hearing after seeing no one wishing to speak.
Dr. Jones moved to approve S-22-06 New Courthouse at South Governors Avenue and West
Water Street to include the Architectural Review Certificate as presented, the Tree Mitigation
Plan and the alternative size of the loading space and the reduction in parking spaces, seconded
by Mrs. Denney.
5
Paj 6
CITY OF DOVER PLANNING COMMISSION JUNE 21, 2022
Mrs. Melson-Williams asked the motion maker to clarify if they are approving the Site
Development Plan as well with reference to the DAC Report and Comments.
Mr. Lenihan asked if the motion could also include all of the waivers that they outlined here
tonight. One was the Tree Mitigation Plan and the waivers were the alternate size for loading
space, the parking space width for the parking spaces within the parking structure, the rear
setback from thirty feet to twenty-five feet and the six-foot high fencing at that rear yard area.
Dr. Jones moved to amend the motion to include approving the Site Development Plan and the
DAC Report and Comments as well as the Tree Mitigation Plan and all waivers requested (as
listed above by applicant), seconded by Mrs. Denney and the motion was carried 7-0 by roll call
vote with Mrs. Malone and Mrs. Maucher absent. Dr. Jones voting yes. Mrs. Welsh voting yes;
the facility is badly needed, and she thinks the design has come through as a very well thought
out and exceptionally planned facility. Mr. Cooper voting yes; for reasons previously stated. Mr.
Roach voting yes; for reasons previously stated. It is definitely needed and he appreciates the
applicants working so hard with the Planning Staff. Mrs. Denney voting yes; she thinks this is a
lovely enhancement to our City and to that area and she as well, is very excited and looking
forward to seeing this progress. Mr. Baldwin voting yes; for all of the statements that have been
made. Mr. Hartman voting yes; based on the comments of the Planning Staff and the DAC
Meeting and the Architectural Review Recommendation Report.
S-22-07 Parking Lot at 446 South Governors Avenue – Public Hearing and Review of a Site
Development Plan Application to permit the construction of a 45-vehicle parking lot to serve the
proposed Kent County Family Court. This parking lot is in addition to the proposed parking
garage facility proposed for the Kent County Family Courthouse. The Site consists of a parcel of
land consisting of a total of 0.4989 +/- acres. The property is zoned C-2A (Limited Central
Commercial Zone) and subject to the SWPOZ (Source Water Protection Overlay Zone). The
property is located on the west side of South Governors Avenue, north of West Water Street. The
owner of record is the State of Delaware. Property Address: 446 S. Governors Avenue. Tax
Parcel: ED-05-077.09-03-21.00-000. Council District 4. Project Site is associated with Site
Development Plan Application S-22-06 New Family Courthouse at S. Governors Ave and W.
Water Street.
Representatives: Mr. James Taylor, Duffield & Associates; Mr. Elio Baltista Jr., Parkowski
Guerke and Swayze PA; Mr. Bill Lenihan, Tevebaugh Architecture
Mr. Swierczek stated that this application is for a parking lot located at 446 South Governors
Avenue. This is accessory to the Courthouse project and has been accompanying the Courthouse
review through both the Historic District Commission review process as well as the DAC
review. This property is zoned C-2A (Limited Central Commercial Zone) and is also subject to
the SWPOZ (Source Water Protection Overlay Zone); however, as Mrs. Melson-Williams
mentioned earlier, the Downtown area is not subject to some of the restrictions that it would be
elsewhere in the City. However, it is worth noting that the proposed development which is on the
site of the previous Box Outlet would reduce the impervious coverage there by a little over 21%.
They are meeting their tree planting requirements and landscaping requirements. After some
determination by Planning Staff, the adjoining property that is zoned commercial is actually a
residential use. After discussions with the applicant, they were accommodating it and meeting
6
Paj 7
CITY OF DOVER PLANNING COMMISSION JUNE 21, 2022
the Code requirements. Therefore, they will add additional landscaping for screening along that
northern property line and the recommendation of Planning Staff that pedestrian connectivity be
improved under this Site Plan. The applicant has expressed willingness to work with that as well,
saying that they would include added sidewalk to the bicycle parking pad as well as to the
parking area in general.
Mr. Taylor stated that he would like to thank Planning Staff for all of their support and working
through this project. As Mr. Swierczek mentioned, the two major comments related to this were
pedestrian connectivity into the parking lot as well as ADA parking spaces and they are working
to come up with that accommodation. With all of the comments received, we are anticipating
working with the different members of the DAC to make this project happen.
Mr. Hartman opened the public hearing and after seeing no one wishing to speak, closed the
public hearing.
Mrs. Denney stated that she has a comment in regards to this aspect of the project. Just because
for many years she worked in that vicinity on Queen Street and living on North State Street, she
often, after a substantial rain events, found it very difficult to get to her home. Because with the
impervious soil aspect of that area, the old Eden Hill Farm space, and plenty of land; but for
some reason rainwater wants to run downhill and of course that runs on the impervious soil.
There have been many floods and many opportunities for the City of Dover Police Department to
busy themselves putting up barriers for that reason when they could be doing other things. She
just wanted to make that comment because that is of concern to her. She used to dream that
somebody would take down that building there that is going to be taken down for parking space
and instead make a stormwater management area. Responding to Mrs. Denney, Mr. Taylor stated
that it is one thing that has been identified and noted. He is sure Mr. Lyon can comment on this
as well but the City is currently working on projects in this area to improve drainage. There is
currently a project from about this intersection down towards the discharge part to the east which
is called the Meeting (House) Branch and then there is also other drainage improvements
proposed. We are currently working with the City of Dover as part of this project to be able to
put an underground stormwater facility in this parking lot. Although not shown currently as part
of this plan, this is something that has been discussed in the last two months with the City and
the State is willing to work with them to provide some additional storage area for those rain
events.
Mrs. Denney stated that over the years, she has had a lot of experience with parking lots,
driveways, etc. that they used to call “parkable turf” and she realized that there are a lot of safety
issues for tripping and stuff. But she was just wondering if there had been any discussion about
something like that. Obviously, we have to have a place for water to go. Responding to Mrs.
Denney, Mr. Taylor stated that the project, as Mr. Swierczek mentioned, is almost 100%
impervious on the lot today with the building and the parking. They are reducing that by about
21% which is adding a lot more green space than what exists today. Through the State, with the
redevelopment requirements, which is what they try to do to meet those events if they want to get
enough water back into the ground, they consider redevelopment to be 15% so they are
exceeding that expectation. Having a turf block type thing versus having asphalt surface gets a
little tough in this type of area because if you want to have it from a maintenance perspective,
7
Paj 8
CITY OF DOVER PLANNING COMMISSION JUNE 21, 2022
you need to be able to provide people with a safe place to park. All of the area that is impervious
(all of the area that is asphalt), would drain to an underground stormwater facility to be collected
and held for a period of time before releasing back into the system. What that is usually designed
for is, let’s get it away from those peak hours of where the high intensity comes down, you start
getting your flooding and they let everything go back out. They are still in design of exactly what
that’s going to look like, but all of those things have been taken into consideration with the
design of this lot to try and help mitigate some of the issues that the City has seen within the last
number of years.
Mrs. Melson-Williams stated that Mr. Jason Lyon from the Department of Water and
Wastewater would like to make a comment as well. His department, in conjunction with others,
has been working on this drainage issue.
Mr. Lyon stated that the State has been extremely gracious to partner with us on this project. The
City actually has a stormwater management project in this area, although it’s not timing with this
project. We are kind of expediting a little bit to kind of utilize this parking lot as an underground
storage facility as it kind of functions the same way as the comment about the permeable turf.
The water would still get underground and beheld there. It is important to note that that
intersection of Water Street and Governors Avenue is for all intents and purposes a bath tub; it
drains all of those roads. As one would imagine, the stormwater structure in that area was never
really designed to today’s standards so part of our long term project is to upgrade that area. But
with the cooperation with the State, they are working on utilizing that parking lot to have some
sort of storage. As Mr. Taylor mentioned, they are still working through the details of that. It is
also important to note that the parking lot is actually a little bit higher than the intersection so just
putting a stormwater facility in that parking lot is not going to solve all of the problems, but it
certainly will help it as well.
Mrs. Welsh moved to approve S-22-07 Parking Lot at 446 South Governors Avenue as there are
no waivers and she would imagine that the applicant will comply with all of the DAC comments,
seconded by Mr. Cooper and the motion was carried 7-0 by roll call vote with Mrs. Malone and
Mrs. Maucher absent. Mrs. Welsh voted yes; it’s apparent that it’s a necessary accessory to the
Courthouse and it appears to be a good use of the space on that corner and it sounds like with
the stormwater mitigation that it’s going to provide some needed improvement to the drainage in
that area. Mr. Cooper voting yes; for reasons previously stated. Mr. Roach voting yes; for
reasons previously stated. Mrs. Denney voting yes; obviously, we have to have a parking space
there and she just really hopes that when all is said and done, some of the flooding in that area
will be gone. Mr. Baldwin voting yes. Dr. Jones voting yes; for reasons previously stated. Mr.
Hartman voting yes; he agrees with the comments of the DAC Report.
S-22-09 Dover Apartments at Leipsic Road – Public Hearing and Review of a Site Development
Application for the construction of six (6) 3-story, 46,800 GSF garden style apartment buildings
each containing thirty-six (36) units for a total of 216 apartment units. Also proposed are eleven
(11) garage buildings, a Clubhouse with Pool, Recreation Facilities, parking, and other site
improvements. The property is zoned SC-2 (Community Shopping Center Development Zone)
and partially subject to the SWPOZ (Source Water Protection Overlay Zone) Tier 3: Excellent
Recharge Area. The property is located on the southeast side of Leipsic Road east of North
DuPont Highway. The owner of record is Rojan DD 15, LLC and equitable owner/developer is
8
Paj 9
CITY OF DOVER PLANNING COMMISSION JUNE 21, 2022
Metropolitan Group. Property is currently unaddressed. Tax Parcel: ED-05-068.05-01-15.01-
000. Council District 3. This site was previously subject to Minor Subdivision Application SB-18-
01. The related commercial development immediately adjacent to the southwest was reviewed as
Master Plan S-19-03 Retail Center at 747 N. DuPont Highway (DuPont Plaza). Waiver
Request: Reduction of Parking Requirement. Review of Active Recreation Area Plan with
Consideration of Partial Fee-in-lieu of Active Recreation Area Construction.
Representatives: Mr. James Taylor, Duffield & Associates; Mr. John Rathfon, Metropolitan
Group; Mr. Joseph Dopsovic, Metropolitan Group
Mr. Swierczek stated that this is a Site Development Plan application for a series of six
apartment buildings. Each is to contain about thirty-six apartment units and be 46,800 SF and
three stories in height. There are also eleven garage buildings proposed on site containing five
parking spaces and some storage facilities in each one of those buildings. This site had
previously gone through a Preliminary Land Use Services Review or PLUS Review. To the left
on the Site Plan, there is a ten-acre parcel of land. This had previously been one overall site of
twenty-five acres that had been subdivided in 2018 under Application SB-18-02. In 2018 was
this PLUS Review which is generally a process which is required whenever there are commercial
developments of over 75,000 SF or residential developments containing 125 of more dwelling
units. This has also been submitted with an Active Recreation Plan for your consideration as well
as a partial cash-in-lieu for a Recreation Area construction as well as a Waiver Request for the
partial reduction of parking requirements. With regards to the Active Recreation Plan, that was a
separate Report that was included in your packets. This is a Report that was sent to the Parks and
Recreation Committee in which the original submission of the applicant was presented to them.
The requirements for this development per Code would be that 59,400 SF or approximately 1.36
acres of Active Recreation be provided on-site. The submission of the applicant had originally
shown about 38,011 SF of Active Recreation. This had included a Clubhouse with a swimming
pool, fire pit, sports court, as well as some indoor active recreation area and then elsewhere on-
site there was a Dog Park that was identified. As this was not quite meeting the 59,400 SF as
required by Code, the applicant could either revise their design to meet that requirement or
present a proposal for Cash-in-lieu. They did not have the appraisal for that but the presentation
to the Parks and Recreation Committee did note that they are willing to do that for whatever
portion of that requirement that they would not be able to meet. They are still looking at ways to
increase the Active Recreation Area. With regards specifically to the Waiver for parking, the
minimum requirement for parking is dictated by Code to be 2.25 parking spaces per unit
proposed which with this application would be 486. The plans show 428 parking spaces being
provided. The Waiver submitted by the applicant notes that they manage several other large scale
residential developments in which their experience generally tells them that it’s 1.25 vehicle
parking spaces (per unit) necessary. However, they are asking for a reduction from 2.25 to 1.98
vehicle parking spaces. They also note in their request that it is somewhat smaller units being
proposed of one and two bedrooms as well as the availability of different types of transportation
in the area with bus routes in the vicinity, shared use paths and then the close proximity with
commercial properties nearby. Overall, Staff in review of the plans submitted, they had noted
that they were somewhat deficient in things like tree plantings; however, in the DAC review
process they indicated that they will be revising the plans to ensure that they are meeting
minimum requirements for tree plantings and landscaping in general. They had noted some
9
Paj 10
CITY OF DOVER PLANNING COMMISSION JUNE 21, 2022
concern on their initial review of the pedestrian connectivity noting that there did seem to be
some opportunities to improve pedestrian access internal to the site between the buildings and
the Active Recreation Areas, more specifically the Clubhouse and its facilities as well as to
neighboring properties to the south. Again, discussing this with the applicant, they have indicated
that they are willing to revise the plans to show that they will provide pedestrian facilities. In
regards to the Active Recreation Plan, it was the recommendation of the Parks and Recreation
Committee that the application be approved noting that they were still looking at ways to
increase the active recreation proposed.
Mr. Taylor stated that he would like Mr. Rathfon to come up and talk about Metropolitan Group
as a whole and then they will dive into the project itself.
Mr. Rathfon stated that the Metropolitan Group is a family owned and operated, fully integrated
land development company. He says family operated and fully integrated for two reasons; he
deals with the section of the company that takes the ground from acquisition through approvals
and then he oversees the construction. Once this is approved, they pass it to their D&B
construction group; they are their general contractors as well. They manage the site work and
construction which then gets transferred to Metropolitan Management Group which is our full-
service apartment management group with in-house maintenance staff and leasing staff. They
also do have a residential portion and a commercial portion of our company, so they basically do
it all. One thing that is very important for the Commission to know is that they are family
operated. The owner of the company is self-made and he has come from owning one apartment
to now owning about 3,500 apartments. They build about 300-500 a year in-house. He has six
children and the first of the children has just entered the business. They are here for the long
haul. When they come into communities like this, they come trying to better the community and
trying to bring housing to the community that is in need. They are here to be a long-term partner
with the community. We don’t get a project approved and flip it. We don’t build it and then flip
it. They plan to own this for 35-50 years and have it passed to the generations of the family.
Mr. Taylor stated that Mr. Swierczek has been great to work with as always. There we some
specific recommendations that were listed in the Report for the conditions to meet approval and
he wanted to talk through some of those. For the pedestrian connectivity as Mr. Swierczek
mentioned, they are committed to providing that connectivity interior to the site. One item that
ties into the Active Recreation Area piece of it is that they have been working on developing a
trail path that would go around the bottom portion of the site and then connect up to the shared
use path along Leipsic Road. That would add about 16,000 SF into the Active Recreation Area,
reducing the Cash-in-lieu amount to about 5,000-6,000 SF. We are still working on the exact
design of that and look forward to working with Staff on showing that and getting that down to
an additional amenity for this community. One of the other pieces was regarding bicycle parking
facilities and providing some type of cover. In discussion with the owners, we are looking at
providing bicycle spaces in the breezeways that go between the residential units. There are three
on each building and being able to provide some bicycle racks in that area would provide some
shelter for those spaces. He is going to have Mr. Dopsovic come up and talk about some of the
other Active Recreation pieces and the parking spaces and the electrical vehicle charging
stations. As far as DelDOT process, the TIS is about 50% through the process. They are
requiring them to analyze the intersection of Route 13 and Leipsic Road as well as their site
10
Paj 11
CITY OF DOVER PLANNING COMMISSION JUNE 21, 2022
access points. As shown on the plan, there are two access points. One that is a shared access
point with the commercial development; and then about three quarters to the right, you can see
an entrance on Leipsic Road as well. DelDOT has previously stated that those two access points
make sense. He believes from the number of units perspective; they need to make sure that they
have two access points to the site as well. For stormwater management, they are working with
Kent Conservation District on the stormwater design for the site. A portion of the site falls with
the SWPOZ (Source Water Protection Overlay Zone) which permits a maximum of 30%;
however, we can go up to 60% if we provide certain practices or at least try to meet superior
infiltration design. So, they are currently undergoing some geo-technical testing and working on
the stormwater design for the site. They are at about 40% in that SWPOZ (Source Water
Protection Overlay Zone) which is the portion to the left-hand side. Regarding lighting, site
lighting will be designed in accordance with the City of Dover Code. They don’t anticipate any
issues with that.
Mr. Dopsovic stated that in regards to the parking, historically, like Mr. Rathfon said, our 3,500
properties they have never really exceeded 1.25 spaces per unit necessary or required. 2.25 is a
little excessive from what they are used to; however, they are trying to get to around 2 which
would be far in access of anything that we’ve provided before. They always make sure that if
there is a problem to address, they will take care of it and that even requires certain parking
spaces per building and where they are located. That is always in the back of our minds. That
would be the only large variance that we are really looking for at this time. In terms of tree
count, we are trying to provide a green space. In fact, part of the fee-in-lieu of for our Active
Recreation would be to not just place a bunch of playgrounds or anything on our space to want to
have some green space there if possible. We are trying to provide a trail now to get closer to that
number but above and beyond the fee-in-lieu of is not a problem. They will be fine providing
back to the City to make sure the City of Dover has enough green space as well. Right now, they
are trying to convert inactive land and make a nice space for residents. Also beyond that, getting
back to the transportation aspect of it, the bike spaces that they are planning on providing per
building will be in excess of what is required by far. He thinks it will be something like six per
building that would be required, and they will probably end up providing something like
eighteen per building; so, the bikes shouldn’t be an issue. In terms of electrical vehicle charging,
they have a stub directly in front of the Clubhouse that will be available from day one. Then
moving forward, all of our buildings are getting over-amperage so that they can provide stubs out
to parking spaces. As they see an influx of absorption of how many people are actually going to
be using electrical vehicles, we will be able to upgrade as necessary. Beyond that, their garages
are also going to be wired up so that they can have individual units per meterage. So, somebody
could lock up their car at night and charge it in their own dedicated spaces. They are all ways
that they are trying to future proof not just this building or facility but all of the facilities that
they have moving forward because they obviously know that this is the direction that
transportation is moving.
Mr. Taylor stated that a Dog Park was mentioned and there is also a Clubhouse block which is
shown in the middle of the screen, which is have a Clubhouse, a pool, a sports court, playground,
a car wash, a dog wash and then also a fire pit as well. That kind of covers all of the active
recreation. Just a comment on the Active Recreation Area reduction, this site as mentioned has a
Source Water Protection Overlay Zone (SWPOZ) which has a limit on the impervious coverage.
11
Paj 12
CITY OF DOVER PLANNING COMMISSION JUNE 21, 2022
In addition to the impervious coverage, the site also has a little bit of a high groundwater table
which makes their stormwater facilities larger in size versus smaller and allowing for lots of
infiltration. They are working through that balance as a whole for the site.
Mr. Hartman asked what the expected deficit is for the Recreation Area now. Responding to Mr.
Hartman, Mr. Taylor stated that originally, they were looking at 21,000 SF as the deficit but with
the addition of the trail along the bottom side, that added about 16,000 SF. So, they will be in the
range of 5,000 to 6,000 SF as a deficit.
Mr. Cooper asked if there was a break-down of how many of the apartments are going to be one
bedroom, two bedroom and three bedroom apartments? Responding to Mr. Cooper, Mr. Rathfon
stated that they tend to be about two thirds to one third. Two thirds are 2-bedroom apartments
and one third are 1-bedroom apartments. This product, a thirty-six unit product does have a little
more 1-bedroom units so it’s around 65/35. They don’t do any 3-bedroom units. Typically, our
tenants don’t have that many school aged children.
Mr. Hartman opened the public hearing and after seeing no one wishing to speak, closed the
public hearing.
Mrs. Welsh moved to approve S-22-09 Dover Apartments at Leipsic Road inclusive of all DAC
comments and the Waiver Request for the reduction of the parking requirement.
Mrs. Melson-Williams asked Mrs. Welsh to provide action on the Active Recreation Plan and
their request for a use of partial Cash-in-lieu as well in the motion.
Mrs. Welsh moved to approve S-22-09 Dover Apartments at Leipsic Road inclusive of all DAC
comments, the Waiver Request for the reduction of the parking requirement, the Active
Recreation Plan, and the request for partial cash-in-lieu of the Recreation Area construction,
seconded by Mrs. Denney and the motion was carried 7-0 by roll call vote with Mrs. Malone and
Mrs. Maucher absent. Mrs. Welsh voting yes; she thinks that it’s a well-designed project and she
thinks that it will work well in the space. The floor plans are well thought out and she was quite
impressed with the renderings of the exterior of the facility; it looks to be a very well thought out
and beautiful community. Mr. Cooper voting yes; for everything Mrs. Welsh said. Mr. Roach
voting yes; for reasons previously stated. Mrs. Denney voting yes; she is excited for this project.
She thinks it’s beautiful and well thought out. Certainly living space is needed here and she also
has an appreciation for the way they look towards the future with the electric car parking and
she agrees with Mrs. Welsh; it really addressed recreation well. Mr. Baldwin voting yes; for
reasons previously stated. Dr. Jones voting yes; for reasons previously stated. Mr. Hartman
voting yes; he agrees with the DAC plan and Staff comments.
NEW BUSINESS
Update on Dover Air Force Base Compatible Use Study
Mrs. Melson-Williams stated that included in the packet for the May Meeting was information
about a Public Workshop to be held on May 17, 2022. You can still see what the Workshop was
all about because the project site for the Dover Air Force Base Compatible Use Study does
12
Paj 13
CITY OF DOVER PLANNING COMMISSION JUNE 21, 2022
include a copy of the Workshop Presentation and a recording. That project site includes other
information as they have been in the data gathering phase. Staff has participated in a driving tour
of the Base and the associated assets that are necessary for the Base including all the way out to
Port Mahon to see the fuel off-loading facility which is quite an adventure on a school bus. It is
an ongoing study and they are moving into what they call stakeholder interviews. There will be
other opportunities for public workshop participation, so she encourages the Commissioners to
take a look at the Study site. It is an area of study that the focus is obviously on the Dover Air
Force Base and the 5-mile area around the Base, which includes a large part of the City and also
areas within Kent County and several other municipalities. There is a Policy Committee and a
Technical Support Committee that are assisting the consultant team on this project as you can see
at the bottom on the flyer. It is related to the Department of Transportation, Century Engineering,
the University of Delaware, and a consultant that is specifically related to airport and airplane
functions; and this is a US Department of Defense funded study. She certainly encourages the
Commissioners to stay in the loop on that and as opportunities for public outreach happen, Staff
will certainly bring those to the Commission.
Update on Downtown Dover Strategic Master Plan
Mrs. Melson-Williams stated that on the meeting agenda they provided the webpage link for this
Master Plan. The Downtown Dover Partnership has a consultant team led by Mosaic
Development Partners that is working on this Study. It is a little bit more of a faster pace with the
Study hopefully to be completed by this Fall. There is an opportunity for a survey for you to
participate in and it’s in the packet. There is a QR Code that you can scan or you can certainly
find the information by visiting the website as well. They have had a pretty good response on the
survey and they are quite pleased with that but they are asking for your big ideas for Downtown.
They would love to hear them. There will be opportunities for some public participation in this
Study as well. They are still moving through stakeholder interviews and really focusing on what
we need to do to make Downtown Dover more vibrant once again. They are willing to listen to
just about anyone and what you think is a crazy idea because it might not be so crazy. If you
have any questions Staff can try to answer those.
Mr. Hartman encouraged everyone to please fill out the survey. One of the comments that he is
going to make is that the multiple websites that they have Downtown. When he asks a question
about something that is going on, he never hears back.
Mrs. Denney stated that she was so excited when she saw it that she completed it immediately.
She finds it exciting because when you go through years and years where you think, does
anybody really care. Because we are so focused on what’s wrong that it’s a good feeling to talk
about what would be right and exciting.
Mr. Hartman asked if they are actually going to look at the surveys. Responding to Mr. Hartman,
Mrs. Melson-Williams stated yes, they have actually been looking at them. There may be some
reporting on the early findings of the survey on the website. She has heard that the number of
people that completed the survey in the first week; they were amazed by it. They have been
hearing good things but that is through her position on the Downtown Dover Partnership Board
at the current moment because the City Planner is one of the named positions there. She
13
Paj 14
CITY OF DOVER PLANNING COMMISSION JUNE 21, 2022
encourages you to be involved in your community and take a look at both of these studies and
opportunities to share.
Meeting adjourned at 8:46 PM.
Sincerely,
Kristen Mullaney
Secretary
14