Paj 1

CITY OF DOVER, DELAWARE COUNCIL COMMITTEE OF THE WHOLE MEETING Tuesday, July 12, 2022 at 6:00 PM City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware AGENDA THIS AGENDA HAS BEEN REVISED TO INCLUDE UPDATED WEBEX INFORMATION Public comments are welcomed on any item and will be permitted at the appropriate time. When possible, please notify the City Clerk (302-736-7008 or email at cityclerk@dover.de.us) should you wish to be recognized. VIRTUAL MEETING NOTICE This meeting will be held in the City Hall Council Chambers with electronic access via WebEx. Public participation information is as follows: Dial: 1-650-479-3208 Link: https://rb.gy/zptxzx Event number: 2535 870 5434 Event password: DOVER (if needed) If you are new to WebEx, get the app now at https://www.webex.com/ to be ready when the meeting starts. CALL COUNCIL COMMITTEE OF THE WHOLE MEETING TO ORDER PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE ADOPTION OF THE AGENDA 1. Presentation of Meeting House Branch Drainage Improvement Project (Committee Action Not Required) 2. NCALL Donation of 7,176 square feet of 235 North Kirkwood Street to the City of Dover (David S. Hugg, III, City Manager) (Staff recommendation: approve acceptance of donation.)

Paj 2

COUNCIL COMMITTEE OF THE WHOLE MEETING - July 12, 2022 PAGE 2 MAYOR AND COUNCIL REPORTS 3. Council President Sudler 4. First District 5. Second District 6. Third District 7. Fourth District 8. At - Large 9. Mayor Christiansen ADJOURNMENT OF THE PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE MEETING UTILITY COMMITTEE ADOPTION OF THE AGENDA 1. Engineering Support – Water Street & S. Governors Avenue (Jason Lyon, Director Water Wastewater) (Staff recommendation: authorize additional engineering design support to the Office of Management and Budget, Division of Facilities Management to increase stormwater storage, in the amount of $16,500.) ADJOURNMENT OF THE UTILITY COMMITTEE MEETING LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE ADOPTION OF THE AGENDA 1. Evaluation of Bids – Garrison Oak Technology & Business Park (GOTBP) Substation Switchgear (Shawn Burgett, Engineering Services and System Operations Superintendent, Electric Department) (Staff recommendation- awarding contract #22-0036EL to Siemens) 2. Proposed Budget Amendment to the 2019 CDBG Action Plan with the special allocation authorized by the Coronavirus Aid Relief and Economic Security Act (CARES Act) (Tracey Harvey) (Staff recommendation: approval of the Proposed Budget Amendment totaling $91,931 for Fiscal Year 2019)

Paj 3

COUNCIL COMMITTEE OF THE WHOLE MEETING - July 12, 2022 PAGE 3 3. Consideration of School Resource Officer (SRO) requests (Chief Thomas Johnson, Dover Police Department) (Staff recommendation: approval of School Resource Officer requests, contingent on funding from requestors) 4. Engineering services required to complete the Meeting House Branch Drainage Improvement Project design (Sole Vendor) (Mark Nowak, Public Works Director) (Staff recommendation: to use AECOM (Sole Vendor) for engineering services required to complete the Meeting House Branch Drainage Improvement Project design) 5. Adjustment to Police Promotion Process (Mayor Christiansen and Chief Johnson) (Staff recommendation: Approve the revised table as requested.) ADJOURNMENT OF THE LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE MEETING ADJOURNMENT OF THE COUNCIL COMMITTEE OF THE WHOLE THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING

Paj 4

Item 1. Meeting House Branch Drainage Improvement Project Where Are We| The Plan Forward | Anticipated Schedule Joshua Barth Environmental Scientist Department of Public Works 4

Paj 5

Item 1. 5

Paj 6

Item 1. Brief History: • Pre-1940 A branch of the Saint Jones River – Meeting House Branch, drained around 600 acres of land through city. • 1940s the City of Dover used downstream portion as a dump. • 1960-1970 the City of Dover used same downstream portion as a wastewater treatment facility • 1970-2016 the City of Dover used downstream area as a public works yard Historical United States Geological Survey Map (1930) 6

Paj 7

Historical City of DoverItem 1. Map. Red arrow indicates PWII Property. Green arrow indicates hospital. 7

Paj 8

Item 1. Map of Meeting House Branch today, enclosed, and developed over. Meeting House Branch has a drainage area of ~600 acres. Red arrow identifies PWII property. Black line represents location of Meeting House Branch. *Only 0.2 miles of the stream remains open today (by Cherry St).* 8

Paj 9

Item 1. 9

Paj 10

Item 1. Brick arch under South State St 10

Paj 11

Item 1. Where are We? • Working with AECOM to finalize drainage improvement project design. Design is currently 50% complete (need to design open channel from State Street to the Saint Jones River). • Working with Compliance Environmental and EA Engineering to complete VCP at PWII. PWII is contaminated with trash, metals, and oil debris 11

Paj 12

Item 1. Plan Forward? 1) Complete Ecological Risk Assessment 2) Complete Feasibility Study for recreational scenario (accommodates park and Drainage drainage improvement Eco-Risk Assess Feasibility Project Study project) Design 3) Complete drainage improvement project design 4) Clean up PWII and construct drainage improvement project 12

Paj 13

Item 1. Anticipated Schedule? 13

Paj 14

Item 1. Thank You! 14

Paj 15

Item 2. ACTION FORM PROCEEDING: CCOW Parks and Recreation Committee DEPARTMENT OF ORIGIN: City Manager DATE SUBMITTED: 7/6/22 PREPARED BY: David Hugg SUBJECT: NCALL Donation 7,176 square feet of 235 North Kirkwood Street REFERENCE: RELATED PROJECT: Mary Street Park REVIEWED BY: EXHIBITS: NCALL letter and plot of proposed lot line adjustment EXPENDITURE REQUIRED: n/a AMOUNT BUDGETED: n/a FUNDING SOURCE (Dept./Page in CIP & Budget): n/a TIMETABLE: STAFF RECOMMENDATION: Approve acceptance of donation BACKGROUND AND ANALYSIS The properties at 217, 225, and 235 N. Kirkwood Street was purchased by NCALL from the Pride of Dover Lodge with assistance from the City. NCALL pledged to donate a portion of the 235 North Kirkwood Street property to add to Mary Street Park. NCALL has approached the city offering to donate 7,176 square feet of property as part of their anticipated subdivision and future construction of four new residential units. Attached are the letter from NCALL making the offer and a plot of the minor lot line adjustment creating the four lots and indicating the area to be donated and added to the Mary Street Park. Council approval is required for the acceptance of this land donation. 15

Paj 16

Item 2. 16

Paj 17

Item 2. 17

Paj 18

Item 1. CITY OF DOVER, DELAWARE ACTION FORM PROCEEDING: Council Committee of the Whole (Utility) DEPARTMENT OF ORIGIN: Water & Wastewater SUBMITTED ON: July 1, 2022 PREPARED BY: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services REVIEWED BY: David Hugg, City Manager and Lori Peddicord, Controller / Treasurer SUBJECT: Engineering Support – Water Street & S. Governors Avenue TIMETABLE: Memorandum of Understanding to be executed within seven (7) days of Council approval. RELATED PROJECT: X REFERENCE: N/A EXPENDITURE REQUIRED: $16,500 AMOUNT BUDGETED: $0 FUNDING SOURCE (Dept./Page in CIP & Budget): Shortfall to be covered by savings in project SW2202 Silver Lake Dam Repairs. STAFF RECOMMENDATION: Authorize additional engineering design support to the Office of Management and Budget, Division of Facilities Management to increase stormwater storage, in the amount of $16,500. BACKGROUND AND ANALYSIS: The State of Delaware is currently in the design phase of constructing a new Kent County Family Courthouse and associated parking lots. The location of this project is on the northern side of the Water Street and S. Governors Avenue intersection. This intersection is prone to significant flooding, as such, the city is in the process of conducing a feasibility study, engineering design, and ultimately improving the stormwater system in this area. As this courthouse will construct a parking lot on the northwest intersection of Water Street and S. Governors Avenue, city staff identified a potential area for stormwater improvement. Underground stormwater storage could occur below the proposed parking lot. The initial plan is to have this function as an overflow location for stormwater. City staff met with the Office of Management and Budget, Division of Facilities Management (DFM) to discuss a partnership with this improvement. Both parties agreed that this would be the opportune time to design this facility. DFM has a design engineer that has provided an estimate to perform this engineering service, the amount is $16,500. This service was not budgeted in the City budget. 18

Paj 19

Item 1. The fee proposed by this work will be supplemented by a budget amendment from the surplus in the Silver Lake Dam Repairs Project. A breakdown of the funding sources in provided below: Funding Description Current Spent / Savings / Requested Proposed Source Budget Encumbered Remaining Change Budget Remaining General SW2205 – Water $22,500* $0 $0 $16,500 $39,000 Street Flooding Imp. General SW2202 – Silver Lake $91,500* $63,482 $28,018 ($16,500) $11,518 Dam Repairs *-this current budget assumes City Council approval during the July 11, 2022 meeting. City staff reviewed the estimate and finds the fee to be reasonable for the service they are provided. Staff recommends authorization of the payment to DFM in the amount of $16,500. 19

Paj 20

Item 1. MEMORANDUM OF UNDERSTANDING This Memorandum of Understanding (“MOU”) is between the City of Dover (the “City”) and the Office of Management and Budget, Division of Facilities Management (collectively, “DFM”) effective July 1, 2022. The City and DFM are collectively referred to as the “Parties.” The purpose of this Memorandum of Understanding is to outline the Parties’ respective roles and responsibilities solely for the design of the underground stormwater collection system (“Project”) in furtherance of the City’s request. The Parties hereby agree that this MOU is expressly limited to the design phase of the Project and exclusive in its entirety as to any subsequent Project phase and that the term “Project” as used herein shall not be deemed or construed to incorporate, expressly or implicitly, any subsequent Project phase; provided, however, that the Parties may hereafter consent in writing signed by both Parties to incorporate by reference this MOU into a separate written agreement between the Parties. Based on recent discussions between the City and DFM, the Parties agreed to proceed with this design phase of the Project—an underground stormwater management system located beneath the proposed Box Outlet parking lot site (Tax Parcel Number 2-05-07709-03-2100-001/02, located at 446/448 S. Governor’s Ave., Dover, Delaware, 19901). The Project is anticipated to provide management and additional storage to facilitate migration of known flooding issues occurring at the intersection of W. Water Street and S. Governors Ave., as part of the Meeting House Branch Drainage project. Noteworthy is that the Project’s design will meet DNREC’s BMP (Best Management Practices) Standards and Specifications. IT IS MUTUALLY AGREED BY THE PARTIES HERETO THAT: A. The purpose of this MOU is solely to complete the Project’s design phase so that any subsequent, separate agreements for the Project’s completion can be fulfilled in conjunction with the building and construction of the new Kent County Family Courthouse and parking lot. B. The execution of the Architectural and Engineering (“A/E”) design work needed for the Project will begin once the proposal for design (“Design Proposal”) has been reviewed and approved in writing by both Parties. The total price for the A/E design work for the Project is $16,500, which includes the civil drawing work by Duffield plus the 10% markup by the A/E firm, Tevebaugh. C. If there are any change orders associated with the Project’s design phase, such change orders will be reviewed and approved in writing by both Parties. 20

Paj 21

Item 1. D. DFM will: a. Contract with an appropriate vendor to perform the architectural and engineering design services for the Project. As required, the vendor will provide DFM the cost estimates for the design and site plans of the Project. b. Provide site plans and design status updates to the City throughout this Project as the same become available. c. Assume responsibility for financial management of the Project expenses, including contracts, purchase orders, and invoices owed by the City. In furtherance of its responsibility in this subsection c., DFM will maintain accurate financial records and make them available to the City upon request. E. City of Dover will: a. Within 30 calendar days of both Parties’ signing the Design Proposal, pay to DFM the amount of $16,500, as such amount is identified in Section B., above. b. Within 30 calendar days of the Parties’ review and written approval of any change orders referenced in Section C., above, pay to DFM the amount owed for any such change order. c. Within 30 calendar days of the City’s receipt of invoices for any and all other expenses for A/E design associated with the Project and not identified in subsections a. and b. in this Section E., pay to DFM the total amount due for such invoices. Project Procedures and Implementation: All correspondence, reports, invoices, and inquiries associated with the content of the Project should be directed to Jason Lyon, Director of Water and Wastewater/Engineering Services at the City of Dover, Department of Water and Wasterwater, PO Box 475, Dover, Delaware 19903 or by email at jlyon@dover.de.us The undersigned agree to the follow the provisions outlined in this MOU. Jennifer Coverdale DATE Director of Facilities Management The City of Dover agrees to disburse funds for this Project in accordance with the rules and procedures outlined in this MOU. David Hugg DATE City Manager, City of Dover 21

Paj 22

Item 2. COMMITTEE ACTION FORM PROCEEDING: Council Committee of the Whole - Legislative, Finance and Administrative Committee DEPARTMENT OF ORIGIN: Electric DATE SUBMITTED: July 6, 2022 PREPARED BY: Shawn Burgett, Engineering Services & System Operations Superintendent SUBJECT: Evaluation of Bids – Garrison Oak Technology & Business Park (GOTBP) Substation Switchgear REFERENCE: N/A RELATED PROJECT: EE2215 REVIEWED BY: Dave Hugg, City Manager; Lori Peddicord, Controller; Paul Waddell, Electric Director EXHIBITS: Exhibit A – Bid Tabulations for RFP 22-0036EL EXPENDITURE REQUIRED: $1,680,581 AMOUNT BUDGETED: $7,000,000 FUNDING SOURCE (Dept./Page in CIP & Budget): Electric/163 Acct # 411-42-26-99-000-57060 TIMETABLE: Award upon Council Approval RECOMMENDED ACTION: Staff recommends awarding #22-0036EL to Siemens BACKGROUND AND ANALYSIS This Committee Action Form (CAF) is to gain approval for the purchase of a Switchgear building to be installed at the new GOTBP substation. This piece of equipment will be used to house all the breakers, relays, and batteries. It will also provide circuit protection to the 69 kV and 12.47 kV lines coming into and out of the station in addition to arc flash protection to internal equipment and personnel. The battery bank provides emergency DC voltage to power the protection relays in the event of AC voltage failure. The Request for Proposal was solicited and advertised per the City Purchasing Policy by the Procurement Manager, posted on the City website, and sent directly to multiple vendors the City knew could provide the material and there was one (1) response. After evaluation it was deemed that the submission from Siemens fully met the specifications drafted by Aubrey Silvey in partnership with City of Dover Electric personnel. Additionally, the submission from Siemens is a firm price that includes a partial credit (-$50,000) for cancelation fee on the previous switchgear project 22-0008EL. Rank Vendor All in Price Comments Firm pricing, installation & 1 Siemens $1,680,581 commissioning included 22

Paj 23

Item 3. ACTION FORM PROCEEDING: Council Committee of the Whole (Legislative and Finance) DEPARTMENT OF ORIGIN: Planning Department DATE SUBMITTED: June 9, 2022 PREPARED BY: Tracey Harvey SUBJECT: Proposed Budget Amendment to the 2019 CDBG Action Plan with the special allocation authorized by the Coronavirus Aid Relief and Economic Security Act (CARES Act) REFERENCE: N/A RELATED PROJECT: CARES Act funding first and second round allocations REVIEWED BY: N/A EXHIBITS: CARES Act allocation award letter EXPENDITURE REQUIRED: $91,931 AMOUNT BUDGETED: $91,931 FUNDING SOURCE (Dept./Page in CIP & Budget): TIMETABLE: Pending Council approval, the Planning Office will publish a public notice allowing a 5-day comment period for citizens to comment on the proposed amendment. STAFF RECOMMENDATION: Staff recommends approval of the proposed Budget Amendment totaling $91,931 for Fiscal Year 2019. BACKGROUND AND ANALYSIS The City of Dover partnered with the Delaware Department of Health and Social Services (DHSS) to administer the first and second round of CARES Act funding to prevent, prepare and respond to coronavirus (COVID-19). The funds were used to provide motel vouchers to homeless families and individuals and pay utilities for persons facing disconnection of their services due to Covid-19. The first and second round of funding in the amount of $475,372 has been expended servicing 70 families and individuals meeting the January 4, 2022 deadline. In October 2021, American Rescue Plan Act (ARPA) funding was awarded to Dover Interfaith Mission for Housing (DIMH) in the amount of $50,000 to provide motel vouchers and rental and utility payment assistance in response to persons affected by Covid-19. All funding has been drawn down and there is still a need to service this population. DIMH has agreed to continue to administer the grant with the third round of CARES Act funding that will provide motel vouchers, rental assistance and pay utilities for persons facing disconnection of services in response to the negative impact of Covid-19. 23

Paj 24

May 13, 2022 The Honorable Robin Christiansen Mayor of Dover Dover 15 Loockerman Plaza Dover, DE 19901-7327 Dear The Honorable Mayor Christiansen: I am pleased to inform you of a reallocation to your jurisdiction of Community Development Block Grant funds made available to prevent, prepare for, and respond to coronavirus (CDBG-CV) in the amount of $91,931. This reallocation is authorized by the Coronavirus Aid, Relief, and Economic Security Act (CARES Act), Public Law 116-136, enacted March 27, 2020, to respond to the growing effects of this historic public health crisis. The CARES Act made available $5 billion in CDBG-CV funds. These funds were fully allocated to grantees in three rounds. However, some grantees did not apply for one or more allocation rounds by the August 16, 2021, deadline, or otherwise declined their awards. The remaining $3,069,687 of CDBG-CV funds are now reallocated to those grantees that have demonstrated capacity to quickly expend CDBG-CV funds. The grantees eligible for this reallocation are limited to those that expended 99 percent or more of their CDBG-CV funds by January 4, 2022. To accept this reallocation of $91,931, please amend the Consolidated Plan containing CDBG-CV funds to include this reallocation amount and submit to HUD for review. Remember that your citizen participation plan must describe the criteria for an amendment to be considered substantial and that all substantial amendments are subject to the public comment and consultation requirements found in 24 CFR Part 91 before they may be submitted to HUD. Pursuant to the CARES Act, the public comment period for CDBG-CV funds is reduced to not less than five days. Upon acceptance of your Consolidated Plan amendment by HUD, the field office will amend your CDBG-CV grant agreement to include the reallocation amount. Please be aware that the amended grant agreement must be fully executed and submitted to HUD’s Fort Worth Accounting Center by September 23, 2022. After that date, these funds will no longer be available to HUD for obligation or award. This reallocation is part of the CDBG-CV grant and subject to the requirements of the CARES Act and the Notice of Program Rules, Waivers, and Alternative Requirements Under the CARES Act for Community Development Block Grant Program Coronavirus Response Grants, Fiscal Year 2019 and 2020 Community Development Block Grants, and for Other Formula Programs [84 FR 51457]. These requirements include oversight, reporting, and the requirement that each grantee have adequate procedures to prevent the duplication of benefits (DOB). HUD has provided guidance and technical assistance on DOB the prevention of fraud, waste, and abuse, and on documenting the impact of this program for beneficiaries. www.hud.gov espanol.hud.gov

Paj 25

2 The Office of Community Planning and Development (CPD) is looking forward to working with you to successfully meet the urgent and complex challenges faced by our communities. If you or any member of your staff has questions, please contact your local CPD Field Office Director. Sincerely, Jemine A. Byron Acting General Deputy Assistant Secretary for Community Planning and Development

Paj 26

Item 4. ACTION FORM PROCEEDING: Council Committee of the Whole – Legislative, Finance & Administration DEPARTMENT OF ORIGIN: Police PREPARED BY: Chief Thomas Johnson SUBJECT: Additional School Resource Officer for Academy of Dover Charter School, et. al. REFERENCE: N/A RELATED PROJECT: N/A APPROVALS: City Manager, Controller/Treasurer EXHIBITS: None Potential Back-end Exact dollars to EXPENDITURE REQUIRED: PROJECT REVENUE: costs at termination cover Officer costs Reimbursement Revenues from FUNDING SOURCE (Dept./Page in CIP & Budget): participating Schools TIMETABLE: Upon Council approval, the Police Department will add the Academy of Dover Charter School to its SRO program and initiate hiring an additional Police Officer. Presuming that future requests are also fully funded, the same model will prevail for other schools. RECOMMENDED ACTION: Approve the compensated SRO model as requested. BACKGROUND On May 24, 2022 there was a mass shooting at an elementary school in Texas that generated concern across the entire country. Dover PD took note of the incident and provided additional security for all City schools for the balance of that week. On June 3, 2022, Dr. Michelle Marinucci of the Academy of Dover Charter School met with Chief Thomas Johnson, Jr. to request a School Resource Officer (SRO) at their school located at 104 Saulsbury Rd, Dover, DE. The Academy of Dover Charter is a free public charter school with approximately 419 students (85% from within the corporate limits of Dover) in grades K through 8. Their educational process is student-centered and achieved by partnerships involving students, parents, and staff where each child embraces the love, joy, and value of education. Recognizing the complexities of adding to the authorized strength of the Dover PD, the school is requesting the SRO to start as soon as practical for the police department. To fulfill this request, a Memorandum of Understanding (MOU) between the Academy of Dover Charter School and the Police Department will be signed to form a contract. The MOU, following the same template of the current document in place with Capital School District, will cover policy, process and finances. The MOU would cover three years and be reviewed, as well as revised if necessary, every three years thereafter. The cost would mirror that of an entry-level Officer each year and move with the FOP CBA going forward. Therefore; FY 23 would be valued at $110,473.09 (uniforms and gear included), FY 24 would be valued at $102,093.27 (-uniforms/gear +contract raise), and FY 25 would be valued at $105,952.03 (+contract raise). [Total – 3yrs - $318,518.39] These amounts would be paid, in their entirety, by the school. The contract/MOU will contain language that requires 90-day notice of termination. Should that ever occur, the Dover PD would request the city retain the employee and allow the next regular separation to return the department to the appropriate authorized strength. Every effort will be made with the school to coordinate contract termination with a typical employee departure. . ACTION REQUESTED The Legislative and Finance Committee and Council approve this and similar SRO requests going forward. 24

Paj 27

Item 5. CITY OF DOVER, DELAWARE ACTION FORM PROCEEDING: Council Committee of the Whole (Leg & Fin) DEPARTMENT OF ORIGIN: Public Works SUBMITTED ON: July 1, 2022 PREPARED BY: Mark Nowak GISP, Public Works Director REVIEWED BY: Dave Hugg, City Manager and Lori Peddicord, Controller / Treasurer SUBJECT: Engineering services required to complete the Meeting House Branch Drainage Improvement Project design (Sole Vendor) TIMETABLE: Notice to proceed will be given within (30) days of Council approval. RELATED PROJECT: n/a REFERENCE: n/a EXPENDITURE REQUIRED: $250,000.00 AMOUNT BUDGETED: $837,200.00 FUNDING SOURCE (Dept./Page in CIP & Budget): Meeting House Branch Improvements - $837,200.00, Project No. ST2003-CNST Account No.: 101-12-18-35-000-54030 (FY22 Carry Forward). Move 250,000.00 to Project No. ST2003-ENG. STAFF RECOMMENDATION: To use AECOM (Sole Vendor) for engineering services required to complete the Meeting House Branch Drainage Improvement Project design. BACKGROUND AND ANALYSIS: The scope of the project will complete the design for stormwater infrastructure upgrades. Design will include the Bayhealth Hospital parking lot, State Street, and the City of Dover owned property referred to as PWII, adjacent to the Saint Jones River. The project scope increases stormwater capacity, while restoring a section of what was once an open stream known as Meeting House Branch. The open stream will flow from State Street to the Saint Jones River, intersecting PWII. This project originally started in 2014 under the URS Corporation. URS was later bought by AECOM which took over the project/design in 2017. The project was never completed due to budget constraints and other limiting factors. The Department of Public Works is requesting the approval to move forward with AECOM as a sole vendor for the following reasons: 25

Paj 28

Item 5.  Project is large and complex, and AECOM already has firsthand, working knowledge, of the project.  AECOM has all electronic files, engineering designs, and data associated with project.  State of Delaware permitting agencies have already approved aspects of the project under previous AECOM submissions. 26

Paj 29

302.781.5900 tel Item 5. Sabre Building, Suite 300 4051 Ogletown Road 302.781.5901 fax Newark, DE 19713 May 6, 2022 Mr. Joshua Barth Department of Public Works City of Dover P.O. Box 475 Dover, DE 19903 Re: Meeting House Branch Drainage Improvement Project Dear Mr. Barth: AECOM is pleased to submit our proposal to the Dover Department of Public Works for professional engineering services related to the design of drainage improvements for the Meeting House Branch. A. BACKGROUND In 2014, the City of Dover proposed a watershed improvement project that would directly affect the St. Jones River Watershed. The existing stormwater system located in downtown Dover, known as the Meeting House Branch storm sewer, was undersized and negatively impacts the surface water quality of the St. Jones River. AECOM (formerly URS) was contracted by the City to provide preliminary investigations, engineering design, permitting, and preparation of bidding documents. The proposed work associated with the design included the demolition of the existing Public Works Yard (the PWII Site) located along the St. Jones River, construction of a wetland to partially treat stormwater runoff, and improvements to the drainage system extending westerly from the PWII Site through the “Tar Ditch” area and into the Bay Health Hospital, and modifications to the existing Well House 9. In 2016, AECOM completed 90% design including a Hydrologic and Hydraulic (H&H) evaluation, construction plans and specifications and started the permitting process. However, due to the concerns with contaminated soil identified within the PWII site, potential impact to the County’s existing force main related to construction of the proposed constructed wetland, and available funding, the project was put on hold. In July 2021, the City reached out to AECOM regarding finalizing the design. It also provided an update on the Voluntary Cleanup Program at the Site. Dover plans to implement the proposed Meeting House Branch drainage system improvements involving Bay Health storm sewer capacity upgrade, box culvert under State Street, and construction of an open channel to St. Jones River. But it has concerns regarding the wetland construction, such as protection of the existing force main, remediation of the contaminated site, etc. On July 20, 2021, a meeting was held among AECOM, City of Dover, Kent County, EA Engineering, Compliance Environmental and Delaware Department of Natural Resources and Environmental Control (DNREC) to discuss the concerns with the present wetland site design. After the meeting, per the City’s request, AECOM submitted a proposal on September 27, 2021, to refine projected costs for three proposed scenarios: originally designed wetland, altered smaller wetland and grass meadow with open channel. On April 1, 2022, Dover informed AECOM that the City has chosen to pursue Scenario 3, grass meadow with open channel without estimates specified in the September 2021 proposal. Dover requested a detailed proposal for finalizing the design for the selected alternative. B. PROJECT SCOPE The project scope includes design, permitting, and bidding phase services to update the prior design in accordance with the new project directives. 27

Paj 30

Item 5. Page 2 of 7 C. SERVICES TO BE PROVIDED Based on the above project scope, the specific tasks to be performed are as follows: Task 1: Project Management and Pre-design Investigation The pre-design investigations including necessary survey, geotechnical investigations, wetland delineation were conducted in 2016 for the previous design. Changes to the site conditions may have occurred since then. AECOM will provide supplemental investigations to evaluate existing conditions within the project site. Included within this task are the following elements: 1. Project Management throughout the design and bidding phase including coordination with the City of Dover, tracking of budget, deliverables, quality control and schedule. 2. Perform initial site visit and kick-off meeting with Dover to confirm field information. 3. Provide survey services. The survey team will review the previous survey plan and conduct additional field survey. We have budgeted three field days to include: a. Submit a One-call request for South State Street within the project vicinity to field survey the existing utility information. b. Conduct field survey to incorporate the two city projects completed since last design and within the project vicinity. General field checks throughout remaining project area and field survey resulting from this. c. Locate the flags from an updated wetland delineation and show on the base map. d. Update the previous survey plan to reflect the current site conditions. 4. Perform sub-surface utility investigation (SUI). AECOM will obtain the services of a subcontractor, Level A Underground Solutions, to provide private utility locating services. The focus of this investigation is the existing Kent County 30” force main within the PWII site, which was not included in the previous scope of work. Level A will use geophysical methods including Electromagnetic scanning and Ground Penetrating Radar to locate the pipe horizontally (Quality Level B). In addition, Quality Level A data including the location, pipe size and depths below grade surface will be provided using vacuum excavation to excavation test holes on underground utilities. Test hole locations will be located by the AECOM survey team and shown on the base map. 5. Review previous geotechnical report. Provide calculations per DelDOT/AASHTO standards to address previous DelDOT review comments. We don’t foresee any changes in the allowable bearing pressures or other geotechnical aspects that would affect the structural design. No additional test pits will be required. 6. Conduct wetland delineation. A wetland delineation for the Project completed in 2014. Due to the amount of time that has passed, AECOM will delineate the wetland in accordance with the 1987 U.S. Army Corp of Engineers (USACE) Wetland Delineation Manual, Regional Supplements, and applicable guidance, and update the Wetland Delineation Memorandum. The work will be limited to the previously delineated area within the Project Study Area. AECOM will navigate to the delineated wetland and water boundary points using a Trimble Geo XH 6000 series GPS unit to assess the boundary. If the boundary has changed, AECOM will re-delineate the boundary, and survey the new points with a Trimble Geo XH 6000 series GPS unit, or equivalent, with sub- foot accuracy potential. Verified and new boundary points will be re-flagged. Wetland determination data forms that were previously completed will also be confirmed in the field. Any changes in wetland conditions will be noted, and new photographs will be taken at each location. A Revised Wetland Memorandum with updated mapping, data forms, and photographs will be provided. L:\DCS\Projects\1551\DE_Dover\20700539_PWII\Eng_Data\PM\2022.4_ Proposal\2022.5.6_MeetingHouseDrainage Proposal.docx 28

Paj 31

Item 5. Page 3 of 7 Task 2: Design 1. Coordinate with Compliance Environmental and EA Engineering on site contamination and determine the alignment of the open channel through the PWII site into the St. Jones River. Compliance Environmental / EA Engineering will provide delineations of horizontal and vertical extent of contamination and preferred areas for construction of the channel. 2. Review and revise the hydrological and hydraulic (H&H) model to incorporate the selected open channel alternative. AECOM will check the assumptions in compliance with the current design standards related to storm event intensity and duration for the 10-yr design storm event. The H&H model was previously developed for the drainage area only within the project limits. Conditions upstream of the Bay Health Hospital were input from the 2009 detailed H&H evaluation conducted by Becker Morgan. For this proposal, AECOM assumes the same approach and no changes to upstream conditions. Our present scope does not include enlargement or changes to the prior alignment of the 2016 box culvert and associated structures design. 3. Coordinate with Kent County to determine standards to protect the existing 30” force main that will be crossed by the proposed channel and maintain access to the pipe for maintenance throughout the PWII site. 4. Update the design report, design drawings and technical specifications related to the selected alternative and findings from Task 1 above. Finalize construction plans for the entire drainage improvement project. a. The previous structural design of the proposed culvert underneath State Street will be reviewed and updated in conformance with the latest edition of DelDOT’s Bridge Design Manual and ASTM C1577 standard culvert designs. AECOM does not anticipate significant changes to the previously submitted structural design and details for the culvert section or to the headwall and outflow structure. AECOM will submit these documents to DelDOT for review and comment. Each submission will be accompanied by DelDOT’s applicable Plan Submission Checklist(s). As indicated by the checklist, AECOM will submit design reports (i.e. Special Provisions, Structural Calculations, Quality Calculations, etc.) with the appropriate project submissions. b. Revise demolition plan to show existing building foundations and concrete retaining rings to remain in place to limit excavation within contaminated soils. c. Design an open channel with a surrounding grass meadow through the PWII site including plan, profile, and details sheets. Dover will provide the preferred meadow grass seed mix. d. Indicate protections to existing Well House 9 and permanent access to the well house. e. Remove proposed improvements to the Well House 9 building from the Construction Drawings. 5. Finalize contract documents. The contract forms will follow the Engineers Joint Contract Documents Committee (EJCDC) format with supplementary conditions as required by funding agency. Up to six copies will be provided. 6. Prepare an updated opinion of probable construction cost at final design. The following items will be incorporated: a. Include contingency for Kent County force main in case pipe becomes compromised. b. Include cost for engineering support and Resident Project Representative (RPR) service. L:\DCS\Projects\1551\DE_Dover\20700539_PWII\Eng_Data\PM\2022.4_ Proposal\2022.5.6_MeetingHouseDrainage Proposal.docx 29

Paj 32

Item 5. Page 4 of 7 c. Remove the original cost of well house upgrades. Add costs to protect the well house and provide permanent access to the well house. b. Exclude PWII site remediation cost, which will be prepared by EA Engineering and Compliance Environmental under a separate contract. 7. AECOM has budgeted three deliverables to the City for review: 50%, 90%, and Final. 8. AECOM has budgeted one in-person meeting and one virtual meeting with the City during the design phase. 9. Evaluate up to three options to provide access to the South Side of the open channel with a conceptual cost comparison. AECOM will work with the City to select the possible crossing locations. A separate proposal will be submitted by AECOM to then provide design services and incorporate the channel crossing based on the selected alternative as the engineering will vary depending on the selected option. a. Option 1: land crossing with culvert b. Option 2: bridge designed for vehicle use c. Option 3: access from S. State St., no bridge required 10. One additional site visit is included during the design phase to support completion of the design. Task 3: Permitting 1. Sediment and Stormwater Management Plan (SSMP) approval from Kent Conservation District (KCD) will be required. AECOM expects more than 1 acre of soil disturbance associated with the proposed improvements. Therefore, a detailed SSMP plan will be required for the project. AECOM will schedule a preapplication meeting with KCD. A SSMP package including application forms, design narrative, hydraulic calculations and design drawings will be submitted to KCD for review. The proposal includes efforts to address one round of review comments. 2. Notice of Intent (NOI) for Storm Water Discharges Associated with Construction Activity under a NPDES General Permit. The NOI must be submitted to DNREC prior to approval of the SSMP by KCD. AECOM will provide basic info for the online application. An application fee (provided by the City) shall be submitted with the completed NOI. 3. DelDOT Safety Permit. AECOM will contact the regional DelDOT office and prepare permit application package. AECOM will follow up with DelDOT after submittal and provide additional information. 4. AECOM will prepare the supporting documentation and submit applications for the following permits:  USACE Section 404 - Clean Water Act and Section 10 - Rivers & Harbors Act Pre- Construction Notification (PCN) for Nationwide Permit # 43 – Stormwater Management Facilities and Nationwide Permit # 7 – Outfall Structures and Associated Intake Structures – For disturbances to non-tidal wetlands (unmapped non-tidal wetlands are not regulated by the State of Delaware) and work below Mean High Water (MHW) of the St. Jones River.  DNREC Subaqueous Lands Permit/Letter of Authorization (Appendix F – Outfall Structures and Associated Intake Structures and Appendix P – Stormwater Management) – For activities in subaqueous lands (lands lying at or below two feet above local mean high water which support or are capable of supporting certain plant species that are listed in the law and regulations). L:\DCS\Projects\1551\DE_Dover\20700539_PWII\Eng_Data\PM\2022.4_ Proposal\2022.5.6_MeetingHouseDrainage Proposal.docx 30

Paj 33

Item 5. Page 5 of 7 AECOM will prepare Draft and Final permit applications incorporating one round of client review/comments. Upon completion of 50% design, AECOM will start conversations with USACE and DNREC. Draft applications will be submitted to the City for review within 2 weeks of target submittal date. AECOM will follow up with agencies after submittal and provide additional information. We anticipate at least 3 months for agency to complete the review. 5. The City of Dover has jurisdiction over floodplain development in the City. We anticipate coordination with the City regarding the impacts to the floodplain, but previously in discussions with the City’s Flood Plain Coordinator, are not sure of the final needs until the design is complete. Once a path forward is finalized, we will provide the City with an additional services request for any needed services. We have budgeted 10 hours for this coordination. Task 4: Bidding 1. Prepare for and lead a pre-bid meeting. 2. Provide documents to prospective bidders (plan holders) and respond to plan holder’s questions regarding the Contract Documents. 3. Draft and issue up to two (2) addenda. 4. Review the bids and make a recommendation to the City regarding the award of the bid. 5. Issue conformed documents for construction. D. SERVICES NOT PROVIDED The following tasks are not included in the budget for this proposal. AECOM routinely provides or coordinates the following additional services for this type of project and welcomes the opportunity to further assist the City upon request: 1. Property easement support or preparation of easement descriptions. 2. Permit application fees. 3. CCTV of the existing storm sewer. 4. Planning or design of a future Park located at the PWII site upon completion of the project and remediation of the site. 5. Design for the relocation of existing utilities such as power, communications, sanitary, gas, etc. to facilitate the project. 6. Changes in project purpose and / or design which would result in the need for DNREC / Nationwide Permits not specified. 7. Threatened or endangered species involvement. 8. Historic / archaeological resource involvement. 9. Design of any wetland mitigation offsets that may be required during the permitting effort. 10. Construction administration or review services. 11. Any other services not specifically mentioned as included in previous sections. E. ASSUMPTIONS AECOM has made the following assumptions when developing the budget for this proposal. Should any of these assumptions prove inaccurate, AECOM will provide additional needed services at an additional cost upon request by the City. L:\DCS\Projects\1551\DE_Dover\20700539_PWII\Eng_Data\PM\2022.4_ Proposal\2022.5.6_MeetingHouseDrainage Proposal.docx 31

Paj 34

Item 5. Page 6 of 7 1. Access to the project area will not be restricted. 2. Formal Jurisdictional Determination for wetlands is not included. 3. AECOM assumes that regulatory agencies will conduct field reviews of the wetland limits prior to issuing permits. This proposal does not include time for accompanying regulatory reviewers during these field reviews as it has been our experience that this is not often necessary for projects of this type and scale. 4. An in-person Joint Permit Process Meeting (JPPM) with USACE/DNREC is not anticipated for this project however 2 hours has been included for teleconference meetings with USACE and DNREC. 5. The City will provide any existing hazardous material surveys for the existing Public Works buildings. 6. The City will be responsible for all local municipal site plan permits, if required. 7. This project does not include upgrades for Well House 9. 8. The present design will not be altered along the corridor through Bay Health property and at the State Street Crossing. 9. This project does not include relocation of the County force main. The pipe will remain in place and need to be protected during construction. 10. This proposal does not include the development of remediation plans, which will be prepared by EA Engineering and Compliance Environmental under a separate contract. 11. We do not anticipate a “net fill” within the flood plain as part of the proposed improvements at the PWII site. As such, we do not anticipate the need for hydraulic modeling of the St. Jones River to demonstrate any changes in floodplain / floodway elevations resulting from the proposed improvements. 12. Detailed design of access to the South Side of the proposed channel is not included. After the City decides the access option, AECOM will submit a change order to provide design service. 13. City of Dover will provide front end documents and will advertise the project. 14. The City’s electrical department will relocate existing power lines as necessary to facilitate construction. 15. The design basis for improvements to the storm sewer will be the 10-year, 24-hour storm event; however, the 100-year event will be analyzed. The purpose of the project is to improve the capacity of Meeting House Branch lower section, from the Bay Health Hospital through the PWII site. Elimination of any existing flooding conditions along the remainder of the Meeting House Branch storm sewer or improvements to inlet capacities associated with the drainage system is not part of the project scope. 16. The City will manage any property easement efforts that may be required within the project limit. 17. Contractor will obtain any Building and Demolition Permits directly from the City. 18. A boundary survey is not necessary. 19. No additional coordination except specifically mentioned as included in previous sections. 20. Additional site visits and owner requested meetings, beyond those noted as included in Section C, will be billed on an hourly rate basis as additional services. L:\DCS\Projects\1551\DE_Dover\20700539_PWII\Eng_Data\PM\2022.4_ Proposal\2022.5.6_MeetingHouseDrainage Proposal.docx 32

Paj 35

Item 5. Page 7 of 7 F. PROJECT MANAGEMENT The Principal-in-Charge of this project shall be Chris Curran, PE. Karen Du, PE will serve as Project Manager and will be responsible for the day-to-day activities of AECOM. G. SCHEDULE We will begin our services immediately upon receipt of written authorization to proceed and anticipate design will be completed within about eight months. Since 2020, due to Covid restriction, agency review time has been difficult to predict. In the attached preliminary schedule, we assume a six-month permitting time. H. ESTIMATED FEES The estimated budget for our services noted above is on a time and material basis with a not to exceed limit of $250,000. This fee will not be exceeded without written authorization from the Department of Public Works. This proposal is subject to the conditions stated in AECOM Technical Services Inc. Standard Engineering Services Agreement. The scope and pricing provided herein are valid for six months from date of submittal. We look forward to continuing our service to the City of Dover. If you have any questions or need additional information, please do not hesitate to call us. Thank you for the opportunity to be of continued service to the City. Sincerely, AECOM Technical Services, Inc. Christopher T. Curran, PE Vice President Attachments: - Preliminary schedule - AECOM Technical Services Inc. Standard Engineering Services Agreement L:\DCS\Projects\1551\DE_Dover\20700539_PWII\Eng_Data\PM\2022.4_ Proposal\2022.5.6_MeetingHouseDrainage Proposal.docx 33

Paj 36

Item 5. Dover Meeting House Branch Drainage Improvments Preliminary Schedule Date: 05-05-2022 2022 2023 Activity Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Pre-design Investigation (1) 50% Design, Issue For Permit Package (2) City Review 50% Design Permitting (3) 90% Design City Review 90% Design 100% Design, Issue For Bid Package City Review Bid Package Public Bidding 1. Assume NTP issued on 7/1/2022. 2. Assume 2-wk review by the City 3. Assume 4 months for USACE review. 34

Paj 37

Item 5. AECOM Project Number _______________ AECOM Project Name _______________ DESIGN ENGINEERING SERVICES AGREEMENT This Design Engineering Services Agreement (“Agreement”) effective this 6th of May, 2022_, is by and between City of Dover_, a Delaware, (“Client”), and AECOM Technical Services, Inc., a California corporation, (“AECOM”); each also referred to individually as (“Party”) and collectively as (“Parties”). In consideration of the mutual covenants and promises contained herein, the Parties agree as follows: 1. SCOPE OF SERVICES 1.1 AECOM shall perform the services set forth in EXHIBIT A (“Services”), incorporated herein by reference. 1.2 AECOM will provide the work products specifically commissioned by Client for delivery by AECOM to Client and listed in EXHIBIT A (“Deliverables”) in accordance with the schedule (“Project Schedule”). 2. TERM OF AGREEMENT Upon execution by the Parties, this Agreement shall have the effective date set forth above. This Agreement shall remain in force until all obligations related to the Services, other than those obligations which survive termination of this Agreement under Article 27, have been fulfilled, unless this Agreement is sooner terminated as set forth herein. 3. COMPENSATION AND PAYMENT AECOM shall be paid for the performance of the Services in accordance with EXHIBIT B (“Compensation and Payment”), incorporated herein by reference. 4. NOTICE All notices, requests, claims, demands and other official communications herein shall be in writing. Such notices shall be given (i) by delivery in person, (ii) by a nationally recognized commercial courier service; or (iii) by United States Postal Service, registered mail, postage prepaid and return receipt requested. Notices shall be effective upon actual delivery to the other Party at the following addresses: TO CLIENT: Department of Public Works City of Dover P.O. Box 475 Dover, DE 19903 Attn: Joshua Barth TO AECOM: 4051 Ogletown Road, Suite 300 Newark, Delaware 19713 Attn: Christopher T. Curran, P.E. Claims-related notices shall be copied to: AMER-DCSProjectClaimNotices@aecom.com or to which address the receiving Party may from time to time give notice to the other Party. Rejection or other refusal to accept, or the inability to deliver because of changed address for which no notice was given, shall be deemed to be receipt of the notice as of the date of such rejection, refusal to accept, or inability to deliver. Claims-related notices need to include the AECOM project name and number found in this Agreement as well as contact information of the person submitting the notice. 5. AECOM’S RESPONSIBILITIES U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 35 Page 1 of 15

Paj 38

Client’s Name Item 5. Date 5.1 AECOM shall perform the Services in accordance with the degree of professional skill, quality and care ordinarily exercised by members of the same profession currently practicing in the same locality under comparable circumstances and as expeditiously as is consistent with professional skill and the orderly progress of the Project. The full extent of AECOM's responsibility with respect to the Services shall be to perform in accordance with the above standards and to remedy any material deficiencies or defects in the Deliverables at AECOM’s own expense, provided that AECOM is notified by Client, in writing, of any such deficiency or defect within a reasonable period after discovery thereof, but in no event later than 90 days after AECOM's completion or termination of the Services. AECOM MAKES NO OTHER REPRESENTATIONS OR WARRANTIES, EXPRESS OR IMPLIED, INCLUDING ANY IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE, MERCHANTABILITY, INFORMATIONAL CONTENT OR OTHERWISE. 5.2 AECOM will endeavor in good faith, as needed, to obtain from the appropriate authorities their interpretation of applicable codes and standards and will apply its professional judgment in interpreting the codes and standards as they apply to the Project at the time of performance of the Services. Notwithstanding the above, the Parties agree that, as the Project progresses, such codes or standards may change or the applicability of such codes or standards may vary from AECOM’s original interpretation through no fault of AECOM and that additional costs necessary to conform to such changes or interpretations during or after execution of the Services will be subject to an equitable adjustment in the Compensation and Project Schedule. 5.3 AECOM shall be responsible for its performance and that of AECOM’s lower-tier subcontractors and vendors. However, AECOM shall not be responsible for health or safety programs or precautions related to Client's activities or operations or those of Client's other contractors and consultants or their respective subcontractors and vendors (“Contractors”). AECOM shall have no responsibility for (i) construction means, methods, techniques, sequences or procedures; (ii) the direction of Contractors’ personnel; (iii) selection of construction equipment; (iv) coordination of Contractors’ work; (v) placing into operation any plant or equipment; or (vi) Contractors’ failure to perform the work in accordance with any applicable construction contract. AECOM shall not be responsible for inspecting, observing, reporting or correcting health or safety conditions or deficiencies of Client, Contractors or others at the project site (“Project Site”) other than AECOM’s employees, subconsultants and vendors. So as not to discourage AECOM from voluntarily addressing health or safety issues while at the Project Site, in the event AECOM does identify such issues by making observations, reports, suggestions or otherwise, AECOM shall have no authority to direct the actions of others not under AECOM’s responsibility and control and shall have no liability, responsibility, or affirmative duty arising on account of AECOM’s actions or forbearance. 5.4 Notwithstanding anything contained in this Agreement, AECOM shall have no responsibility for the discovery, presence, handling, removal, transportation, storage or disposal of, or exposure of persons to hazardous materials in any form related to the Project. AECOM shall not be responsible for Client's pre-existing site conditions or the aggravation of those preexisting site conditions to the extent not caused by the negligence or willful misconduct of AECOM. 5.5 In the event that the Services include construction observation or similar field services, AECOM’s responsibility shall be limited to determining general conformance with AECOM’s design. Visits by AECOM to the Project Site and observations made by AECOM shall not relieve the Contractors of ther obligation to conduct comprehensive inspections of the construction work sufficient to ensure conformance with the intent of the construction contract documents, and shall not relieve the Contractors of their responsibility for means, methods, techniques, sequences and procedures necessary for coordinating and completing all portions of the construction work and for all safety precautions incidental thereto. 5.6 Any opinions of probable construction costs provided by AECOM represent AECOM's good faith professional judgment in light of its experience, knowledge and the information reasonably available to AECOM at the time of preparation of the opinion. However, since AECOM has no control over the market, economic conditions or the bidding procedures, AECOM, its directors, officers and employees and subconsultants do not make any guarantees or warranties whatsoever, whether express or implied, with respect to such opinions and accept no responsibility for any loss or damage arising therefrom or in any way related thereto. Any reliance upon such opinions, whether by Client or third parties, do so at the relying party’s own sole risk. 6. CLIENT’S RESPONSIBILITIES U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 36 Page 2 of 15

Paj 39

Client’s Name Item 5. Date 6.1 Client shall provide in writing any specific Client requirements or criteria for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations. 6.2 Client shall furnish all information and technical data in Client's possession or under its control reasonably required for AECOM’s proper performance of the Services prior to AECOM’s commencement of the Services or at such other times as Client and AECOM mutually agree. AECOM is entitled and will rely upon the accuracy, completeness, currency and non-infringement of information and data provided by Client or obtained from generally accepted sources within the industry, except to the extent such verification by AECOM may be expressly required as a defined part of the Services. AECOM will not be responsible for defects in its Services attributable to its reliance upon or use of such information and data. 6.3 Client shall arrange for access and make all provisions necessary for AECOM to enter upon public and/or private property as required for AECOM to properly perform the Services. Client shall disclose to AECOM any known or suspected hazards at the Project Site which may pose a threat to human health, property or the environment. 6.4 If any document or inquiry requires Client to approve, comment, or to provide any decision or direction with regard to the Services, such approval, comment, decision or direction shall be provided within a reasonable time within the context of the Project Schedule, or if not identified in the Project Schedule, within a reasonable time to facilitate the timely performance of the Services. 7. INDEPENDENT CONTRACTOR Nothing contained in this Agreement shall be construed to create a partnership, joint venture, or create a relationship of employer/employee or principal/agent between Client or Client’s Contractors and AECOM. 8. CONFIDENTIALITY 8.1 AECOM shall treat as confidential information and data delivered to it by Client or developed in the performance of the Services that are specified in writing by Client to be confidential (“Confidential Information”). Confidential Information shall not be disclosed to third parties by AECOM without the consent of Client, except to the extent reasonably believed necessary by AECOM for its performance of the Services, for a period of 5 years following completion or termination of this Agreement. 8.2 Notwithstanding the above, these restrictions shall not apply to Confidential Information which (i) is already known to AECOM at the time of its disclosure; (ii) becomes publicly known through no wrongful act or omission of AECOM; (iii) is communicated to a third party with the express written consent of Client and not subject to restrictions on further use or disclosure; (iv) is independently developed by AECOM; or, (v) to the extent such Confidential Information is required by Law to be disclosed; provided that the information required for disclosure shall remain Confidential Inforamtion as to all other persons or entities pursuant to the terms of this Agreement, and provided further that AECOM shall promptly provide Client with written notice of such requirement. 8.3 Upon termination of this Agreement or upon Client’s written request, AECOM shall return the Confidential Information to Client or destroy the Confidential Information in AECOM’s possession or control. Notwithstanding the above, AECOM shall not be required to destroy Confidential Information held electronically in archive or back-up systems in accordance with general systems archiving or backup policies or required for preservation by law, regulation, audit, data retention or corporate archival purposes or per regulatory, judicial or governmental order. All such retained Confidential Information shall be kept confidential by AECOM subject to and in accordance with the terms of this Agreement. 9. DATA RIGHTS 9.1 All right, title and interest in and to any Deliverables, and excluding any AECOM Intellectual Property, shall be assigned by AECOM to Client upon full payment for the Deliverables. Client acknowledges and agrees that AECOM is the author of, and retains all rights, title and interest in all other intellectual property, including work papers, templates, details, designs, drawings, plans, renderings, analyses, calculations, models, U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 37 Page 3 of 15

Paj 40

Client’s Name Item 5. Date software, macros, applications, specifications, processes, procedures, interim or draft documents, methodologies, know-how, and any other instruments of service: (a) belonging to AECOM or its consultants prior to the effective date of this Agreement; (b) developed by AECOM or its consultants outside the scope of, or not exclusively pursuant to, this Agreement; (c) licensed by AECOM or its consultants from a third-party; and (d) included within the Deliverables but which are generic, generally applicable to or standard in AECOM’s business (collectively, “AECOM Intellectual Property”). To the extent the Deliverables contain, or Client’s receipt of the Services require the use of AECOM Intellectual Property, to the extent of AECOM’s ownership and control thereof, AECOM hereby grants to Client, upon full payment for the Deliverables and Services, a limited, non-exclusive, non-assignable, royalty-free license to use and sublicense said AECOM Intellectual Property solely and to the extent necessary to achieve the purposes stated in EXHIBIT A. 9.2 Nothing in this Agreement shall be construed to prohibit AECOM or its consultants from using for other purposes, clients or projects the skills, knowledge and experience gained by AECOM or its consultants in the performance of the Services and provision of the Deliverables pursuant to this Agreement, provided that AECOM and its consultants do not use Client’s Confidential Information. 9.3 AECOM, in developing solutions, testing hypotheses, or documenting designs, may employ advanced technologies for simulation, information modeling, generative design, and the development of project documentation (“Technical Tools”). While these Technical Tools may result in digital files and/or simulations or models (“Datasets”), when not specifically defined within this Agreement, these Datasets will not constitute a Deliverable or portion thereof. Rather, the Technical Tools and Datasets will be a byproduct of AECOM’s internal processes and will be AECOM's sole proprietary information. Notwithstanding anything to the contrary in this Agreement, any ownership and data rights provisions will not apply to such Technical Tools and Datasets and AECOM will remain the sole owner of such Technical Tools and Datasets. 9.4 Client understands and accepts that the Services and Deliverables provided by AECOM pursuant to this Agreement are intended by AECOM for the sole use by Client for the specific purpose stated in EXHIBIT A. Client agrees, to the fullest extent permitted by law, to indemnify, defend and hold harmless AECOM and its consultants and their directors, officers, employees, agents, representatives, affiliated and parent companies, (“AECOM Indemnities”) against any and all claims, suits, causes of action, damages, losses, costs, expenses and liabilities (including the aggregate amount paid in reasonable settlement of any actions, suits, proceedings or claims), including reasonable attorneys’ fees and costs of defense, to which AECOM or any of the AECOM Indemnities may become subject as a consequence of any use or modification of, reliance upon, or transmission to a third party of, said Services, Deliverables, AECOM Intellectual Property, by Client outside the scope of this Agreement without the express, written permission by AECOM. 10. RECORD DRAWINGS Client shall direct the Contractors to provide AECOM with updated red-line documentation which accurately and completely reflects any changes between the original design and the final construction. Record drawings to be delivered by AECOM to Client as a part of the Services (“Record Drawings”) reflect the design provided by AECOM as modified by such updated information. Consistently with AECOM’s defined Services, AECOM shall not have an obligation to independently validate such information related to the actual construction. AECOM makes no warranty or guarantee with regard to the accuracy or completeness of the information provided by the Contractors and third parties and shall bear no responsibility for any errors or omissions arising from or related to any defects or deficiencies in such information. 11. ELECTRONIC FILES 11.1 Electronic files to be delivered under this Agreement, if any, contain information to be used for the production of contract documents for the Project and are provided solely as an accommodation to Client. The official Contract Documents of Record (“Contract Documents”) are those documents produced by AECOM which bear seals and/or signatures. Unless otherwise expressly set forth in the Services, no electronic files delivered under this Agreement are Contract Documents. 11.2 The electronic files, if any, were created to supplement the official Contract Documents. Due to the possibility that files of this nature can be modified, either unintentionally or otherwise; or that the information contained in these files can be used in a manner for which they were not originally intended; or that electronic data may be corrupted by electronic transmission, AECOM makes no representation that the files, after U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 38 Page 4 of 15

Paj 41

Client’s Name Item 5. Date delivery, will remain an accurate representation of the source data in AECOM's possession, or are suitable for any other purpose or use. 11.3 All indications of AECOM’s and AECOM’s subconsultants’ involvement, including but not limited to seals and signatures, shall be removed from each electronic display and shall not be included in any prints produced therefrom. 11.4 Client understands and agrees that the right to use the electronic files, if such are provided under this Agreement, is specifically limited to the Project and the purpose defined by AECOM and is conditioned upon proper payment for such use. 11.5 If a third-party license is required to access or use electronic files, Client acknowledges its responsibility at its own expense to obtain all applicable hardware and software needed to legally access the electronic files. AECOM shall have no liability for third parties’ use of or reliance on such files. 12. CERTIFICATION 12.1 For purposes of this Agreement, “certification” means to state or declare a professional opinion based on the standard of performance set forth in Section 5.1 above. 12.2 AECOM shall not be required to execute certificates that would (i) result in AECOM having to certify, guarantee or warrant the existence of conditions whose existence AECOM cannot reasonably ascertain under the existing Services; (ii) require knowledge, services or responsibilities beyond the Services; or (iii) may, in AECOM’s reasonable judgment, require AECOM to make a certification that would not normally be covered by AECOM’s professional or other liability insurance. In addition, Client agrees not to make resolution of any dispute with AECOM or payment of any amount due to AECOM in any way contingent upon AECOM executing such certificates. 12.3 A professional's certification in no way relieves other parties from meeting their respective requirements imposed by contract or other means, including commonly accepted industry standards and practices. If required as a part of its Services, AECOM will provide a written report stating whether, in AECOM’s professional opinion and based on periodic site visits, the construction work complies generally with the Contract Documents. 13. CHANGED SITE CONDITIONS The discovery of hazardous materials, hazardous wastes, pollutants, contaminants or concealed obstructions or utilities that could not reasonably have been anticipated from information provided to and reasonably apparent to AECOM constitutes a changed site condition. To the extent that such changed site condition increases the health and safety risks associated with the Services or requires AECOM to perform services different or in excess compared to those set forth in the Services, AECOM may, at its sole discretion, elect to suspend and/or terminate the related Services and shall be paid for the related Services up through the date of such termination. To the extent that the changed site conditions impact the cost, level of effort or schedule of the Services, equitable adjustments shall be made to the Services, schedule and fee under this Agreement. 14. MATERIALS AND SAMPLES Any items, substances, materials or samples removed from the Project Site for testing, analysis, or other evaluation will be returned to the Project Site unless otherwise agreed to by the Parties in writing. Client recognizes and agrees that AECOM is acting as a bailee and at no time assumes title to said items, substances, materials or samples. 15. COMPLIANCE The Parties shall comply with applicable treaties, compacts, statutes, ordinances, codes, regulations, consent decrees, orders, judgments, rules, and other requirements of governmental or judicial entities that have jurisdiction over the Services (“Law”). 16. FORCE MAJEURE Neither Party shall be responsible for a delay or disruption in, or inability to provide its respective performance under this Agreement, other than a delay in payment for Services already performed, if such delay is caused by events or contingencies, existing or future, beyond the reasonable control of the claiming Party, including “acts of God,” abnormal weather conditions or other natural catastrophes, war (whether declared or not), terrorism, sabotage, computer viruses, civil unrest, strikes, U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 39 Page 5 of 15

Paj 42

Client’s Name Item 5. Date lockouts or other industrial disturbances, pandemics, epidemics, health emergencies, virus (e.g., SARS Cov- 2), disease (e.g. COVID-19), plague, changes in law or regulations, quarantine, travel restrictions, discovery of hazardous materials, differing or unforeseeable site conditions, acts of governmental agencies or authorities (whether or not such acts are made in response to other Force Majeure Events), or any other events or circumstances not within the reasonable control of the party affected, whether or not of a similar kind or nature to any of the foregoing (a “Force Majeure Event”). The Party seeking application of this provision shall notify the other Party in writing promptly upon learning of the impact of the Force Majeure Event upon the notifying Party’s performance of its obligations under this Agreement. Upon the occurrence of a Force Majeure Event, AECOM shall be entitled to an equitable adjustment to the project schedule and compensation sufficient to compensate AECOM for any increase in the time or costs necessary to perform the Services under this Agreement. Should a Force Majeure Event substantially prevent or be reasonably likely to substantially prevent AECOM’s performance of the Services for more than thirty (30) days, then AECOM shall be entitled to terminate this Agreement without breach. In case of such termination, AECOM shall be entitled to compensation for those Services performed as of the date of termination. 17. INSURANCE 17.1 AECOM will maintain the following insurance coverages and amounts: 17.1.1 Workers Compensation insurance as required by Law; 17.1.2 Employer’s Liability insurance with coverage of $1,000,000 each accident/employee. 17.1.3 Commercial General Liability insurance with coverage of $2,000,000 per occurrence/aggregate; 17.1.4 Automobile Liability insurance with coverage of $1,000,000 combined single limit; and 17.1.5 Professional Liability insurance with coverage of $2,000,000 per claim/aggregate. 18. INDEMNITY 18.1 AECOM agrees to indemnify Client, its officers, directors and employees, from third party claims of loss or damage, exclusive of defense obligations, for bodily injury or property damage (“Claims”), to the proportional extent caused by AECOM’s negligence or willful misconduct. 18.2 If Services include AECOM’s performance during the construction phase of the Project, Client shall require Client’s Contractors working on the Project Site to include AECOM, its directors, officers and employees in any indemnity and in any insurance benefits that Client requires such Contractors to provide to Client. 19. CONSEQUENTIAL DAMAGES WAIVER NOTWITHSTANDING ANY OTHER PROVISION TO THE CONTRARY IN THIS AGREEMENT AND TO THE FULLEST EXTENT PERMITTED BY LAW, IN NO EVENT SHALL EITHER PARTY, ITS PARENTS, AFFILIATES AND SUBSIDIARIES OR THEIR RESPECTIVE DIRECTORS OFFICERS OR EMPLOYEES BE LIABLE TO THE OTHER FOR ANY INDIRECT, INCIDENTAL, SPECIAL, CONSEQUENTIAL OR PUNITIVE DAMAGES WHATSOEVER (INCLUDING, WITHOUT LIMITATION, LOST PROFITS, LOSS OF REVENUE, LOSS OF USE OR INTERRUPTION OF BUSINESS) ARISING OUT OF OR RELATED TO THIS AGREEMENT, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES, AND AECOM HEREBY RELEASES CLIENT AND CLIENT HEREBY RELEASES AECOM FROM ANY SUCH LIABILITY. 20. RISK ALLOCATION AND RESTRICTION OF REMEDIES THE PARTIES HAVE EVALUATED THE RESPECTIVE RISKS AND REMEDIES UNDER THIS AGREEMENT AND AGREE TO ALLOCATE THE RISKS AND RESTRICT THE REMEDIES TO REFLECT THAT EVALUATION. NOTWITHSTANDING ANY OTHER PROVISION TO THE CONTRARY IN THIS AGREEMENT AND TO THE FULLEST EXTENT PERMITTED BY LAW, CLIENT AGREES TO RESTRICT ITS REMEDIES UNDER THIS AGREEMENT AGAINST AECOM, ITS PARENTS, AFFILIATES AND SUBSIDIARIES, AND THEIR RESPECTIVE U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 40 Page 6 of 15

Paj 43

Client’s Name Item 5. Date DIRECTORS, OFFICERS, SHAREHOLDERS AND EMPLOYEES, (“AECOM COVERED PARTIES”), SO THAT THE TOTAL AGGREGATE LIABILITY OF THE AECOM COVERED PARTIES SHALL NOT EXCEED $250,000 OR THE ACTUAL PAID COMPENSATION FOR THE SERVICES, WHICHEVER IS GREATER. THIS RESTRICTION OF REMEDIES SHALL APPLY TO ALL SUITS, CLAIMS, ACTIONS, LOSSES, COSTS (INCLUDING ATTORNEY FEES) AND DAMAGES OF ANY NATURE ARISING FROM OR RELATED TO THIS AGREEMENT WITHOUT REGARD TO THE LEGAL THEORY UNDER WHICH SUCH LIABILITY IS IMPOSED. CLAIMS MUST BE BROUGHT WITHIN ONE CALENDAR YEAR FROM PERFORMANCE OF THE SERVICES UNLESS A LONGER PERIOD IS REQUIRED BY LAW. 21. DISPUTES RESOLUTION 21.1 Either Party may initiate a dispute resolution by providing written notice to the other Party setting forth the subject of the claim, dispute or controversy and the requested relief. The recipient of such notice shall respond within 5 business days with a written statement of its position and a recommended solution to the Claim. 21.2 If the Parties cannot resolve the dispute through negotiation, either Party may refer the claim, dispute or controversy to a panel (“Panel”) consisting of a designated senior representative from each Party (“Representative”), who shall have the authority to resolve it. The Representatives shall not have been directly involved in the Services and shall negotiate in good faith. No written or verbal representation made by either Party in the course of any Panel proceeding or other settlement negotiations shall be deemed to be a Party’s admission. If the representatives are unable to resolve the dispute within 15 business days, either Party may pursue its respective legal and equitable remedies. 22. GOVERNING LAW All contract issues and matters of law will be adjudicated in accordance with the laws of the state where the Project is located, excluding any provisions or principles thereof which would require the application of the laws of a different jurisdiction. 23. TERMINATION 23.1 This Agreement may be terminated for convenience by either Party upon 30 days advance written notice. On termination, AECOM will be paid for all Services performed up through the termination date. 23.2 This Agreement may be terminated for cause by either Party if the other Party materially fails to perform its obligations under this Agreement, does not commence correction of such non-performance within 10 business days of receipt of written notice and/or fails to diligently complete such correction thereafter. The respective rights and obligations of the Parties predating such termination shall survive termination of this Agreement. 24. ASSIGNMENT 24.1 Neither Party may assign this Agreement without the written consent of the other Party, which unconcented-to assignment shall be void ab initio. 24.2 Notwithstanding Section 24.1 above, the Parties recognize that AECOM has affiliated companies who have specialized expertise, necessary certifications/registrations or other capabilities that may make use of such affiliates more suitable for the performance of all or part of the Services. AECOM shall be entitled, without additional consent, to assign this Agreement or performance of the Services, in whole or in part, to any of AECOM’s subsidiaries or affiliates upon written notice to Client. 25. PARTIES IN INTEREST Nothing in this Agreement, expressed or implied, is intended to confer on any person or entity other than the Parties any right or remedy under or by reason of this Agreement. The provisions of this Agreement shall bind and inure solely to the benefit of the Parties and their respective successors and permitted assigns. U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 41 Page 7 of 15

Paj 44

Client’s Name Item 5. Date 26. WAIVER Either Party may in writing waive any provisions of this Agreement to the extent such provision is for the benefit of the waiving Party. No waiver by any Party of a breach of any provision of this Agreement shall be construed to be a waiver of any subsequent or different breach. 27. SEVERABILITY AND SURVIVAL The invalidity or unenforceability of any particular provision of this Agreement shall not affect the other provisions, and this Agreement shall be construed in all respects as if any invalid or unenforceable provisions were omitted. Articles 4 (Notice), 5 (AECOM’s Responsibilities), 6.2 (Reliance on Data), 8 (Confidentiality), 9 (Data Rights), 10 (Record Drawings), 11 (Electronic Records), 12 (Certification), 14 (Materials and Samples), 17 (Insurance), 18 (Indemnity), 19 (Consequential Damages Waiver), 20 (Risk Allocation), 21 (Disputes Resolution), 22 (Governing Law), 24 (Assignment), 25 (Parties in Interest) and 27 (Severability and Survival) shall survive termination of this Agreement. To the extent any provision of this Agreement violates any law, or is otherwise invalid or unenforceable, said provision shall be revised to the limited extent necessary to make that provision legal and enforceable and, to the fullest extent permitted by law, consistent with Parties’ original intent. 28. PREPARATION OF AGREEMENT Each Party has had the opportunity to avail itself of legal advice and counsel. Neither Party shall be deemed to be the drafter or author of this Agreement. In the event this Agreement is subject to interpretation or construction by a court of law or panel of arbitration, such court or panel shall not construe this Agreement, or any portion hereof, against either Party as the drafter of this Agreement. 29. SIGNATURES Each person executing this Agreement warrants that he/she has the necessary authority to do so on behalf of the respective Party. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original, but all of which together shall constitute a single agreement. 30. ORDER OF PRECEDENCE Executed Change Orders Desgin Engineering Services Agreement Article 31 “Special Terms and Conditions” Design Engineering Services Agreement Articles 1 through 30 and 32 EXHIBIT B Compensation and Payment EXHIBIT A Services Other contract documents 31. SPECIAL TERMS AND CONDITIONS . None 32. ENTIRE AGREEMENT This Agreement contains all of the promises, representations and understandings of the Parties and supersedes any previous understandings, commitments, proposals or agreements, whether oral or written. This Agreement shall not be altered, changed, or amended except as set forth in a written amendment to this Agreement, duly executed by both Parties. The attached EXHIBIT C (“Change Order”), incorporated herein by reference, is the preferred form for such use. U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 42 Page 8 of 15

Paj 45

Client’s Name Item 5. Date AECOM Technical Services, Inc. CLIENT: _______________ Signature Signature Printed Name Printed Name Printed Title Printed Title Date Date Address Address ____________________________________ ____________________________________ ____________________________________ ____________________________________ ) (End of page) U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 43 Page 9 of 15

Paj 46

Client’s Name Item 5. Date EXHIBIT A SERVICES Services: See attached Proposal dated May 6, 2022. Schedule: See attached Proposal dated May 6, 2022. Deliverables: See attached Proposal dated May 6, 2022. AECOM Project Manager Name Chris Curran, P.E. Title Vice President Address 625 West Ridge Pike, Suite 100, Conshohocken, PA 19428 Phone Number 610.234.0404 Email Address chris.curran@aecom.com Client Project Manager Name Joshua Barth Title Environmental Scientist Address P.O. Box 475, Dover, DE 19903 Phone Number 302.736.7020 Email Address jbarth@dover.de.us (End of page) U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 44 Page 10 of 15

Paj 47

Client’s Name Item 5. Date EXHIBIT B COMPENSATION AND PAYMENT 1 COMPENSATION The Services set forth in EXHIBIT A will be compensated on the following basis: [] Advance retainer of [$ N/A] The advance retainer is to be applied to the final invoice. Any remainder will be returned to Client within 30 days of receipt of final payment. [] Time & Material - See Section 2.1 for Hourly Labor Rates [] Time and Materials with a Not-to-Exceed (“NTE”) amount of ($ 250,000). The Hourly Labor Rates (if applicable) are as in Section 2.1 below. Reimbursable expenses are included in the overall NTE cap. [] Lump Sum [$]: Milestone/Deliverable & Date Payment Amount $ [] Cost Plus Fixed Fee: [Cost $ N/A and Fee $ N/A] [X ] Other: See attached Proposal dated May 6, 2022.. 2. RATE SCHEDULE Compensation shall be based on the following Hourly Labor Rate Schedule: . 2.1 HOURLY LABOR RATE SCHEDULE Senior Principal Professional $ 210.00 – 285.00 Principal Professional / Construction Manager $ 170.00 – 210.00 Project Professional $ 150.00 – 175.00 Senior Professional $ 100.00 – 150.00 Staff Professional $ 80.00 – 100.00 Staff Designer $ 75.00 – 150.00 BIM Specialist $100.00 – 170.00 Project Field Technician $ 75.00 – 125.00 Staff Field Technician $ 50.00 – 85.00 Administrative Staff $ 80.00 – 125.00 Survey Crew (2 person) $ 150.00 – 250.00 Survey Crew (3 person) $ 230.00 – 330.00 Contracted Services and Equipment Rentals 1.1 times our cost 2.2 OTHER HOURLY LABOR RATE CATAGORIES If additional labor categories are authorized during the performance of this Agreement, compensation for each additional category will be negotiated at the time the additional Services are authorized. 2.3 ANNUAL HOURLY LABOR RATE ADJUSTMENTS The Hourly Labor Rate Schedule is adjusted each calendar year to reflect updated labor cost categories. Labor cost of Services authorized in subsequent calendar years will be based on the applicable Hourly Labor Rate Schedule for those years. U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 45 Page 11 of 15

Paj 48

Client’s Name Item 5. Date 3. REIMBURSEABLE EXPENSES Reimbursable expenses are expenditures made by AECOM for goods, travel expenses and vendor services in support of the performance of the Services. Such expenditures will be billed at the actual cost to AECOM plus ten percent (10%) to cover related administrative costs. 4. CHANGE ORDERS The Parties may at any time and by written agreement make changes in the Services, Project Schedule, Deliverables, Compensation or other terms and conditions in this Agreement. The Parties shall effect such change through the use of a written Change Order. EXHIBIT C is the preferred form for such use. 5. INVOICING AECOM will invoice Client on a monthly basis unless otherwise set forth herein. 6 PAYMENT 6.1 If payment is based on Time and Materials with a NTE, once AECOM reaches the NTE, AECOM will stop further Services pending a Change Order to adjust the budget and schedule for the continued performance of the Services. 6.2 Timely payment is a material term of this Agreement. Client shall pay all undisputed portions of AECOM’s invoices within 30 days of receipt without holdback or retention. Client shall notify AECOM within fourteen (14) days of the receipt of the invoice of any disputed items. Such notice must be accompanied by a detailed description of any disputed items and include supporting documentation as well as references to the provision(s) of this Agreement which permit a holdback or retention. If such notice is not provided within fourteen (14) days, Client waives its rights to dispute the invoice Undisputed amounts remaining unpaid 30 days after the invoice date shall bear interest at the rate of 1.5% per month on the unpaid balance and AECOM may suspend the Services pending receipt of such payment. In addition, AECOM retains its unrestricted rights under Article 23 (Termination) of the Agreement. 6.3 If the Project is suspended by Client for more than 30 days, AECOM shall be paid for all Services performed prior to the effective date of suspension within 30 days of such suspension. Upon resumption of the Project, AECOM shall be entitled to an equitable adjustment in cost and schedule to compensate AECOM for expenses incurred as a result of the interruption and resumption of the Services. 6.4 To the extent that completion of the Services is delayed beyond the original scheduled completion date and such delay is not the fault of AECOM, an equitable adjustment shall be made to AECOM’s Compensation and Project Schedule. 6.5 Except as otherwise specifically provided herein, Client shall pay or reimburse AECOM, as appropriate, for all categories of taxes other than income tax, including without limitation, sales, consumer, use, value added, gross receipts, privilege, and local license taxes related to the Services. 6.6 Client shall make payments to AECOM using one of the following methods: 6.6.1 AECOM LOCKBOX: AECOM Technical Services, Inc. 1178 Paysphere Circle Chicago, IL 60674 6.6.2 ELECTRONIC FUNDS TRANSFER/ACH PAYMENT: Account Name: AECOM Technical Services, Inc. Bank Name: Bank of America Address1: Building D Address2: 2000 Clayton Road City/State/Zip: Concord, CA 94520-2425 Account Number: 5800937020 ABA Routing Number: 071000039 U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 46 Page 12 of 15

Paj 49

Client’s Name Item 5. Date 6.6.3 WIRE TRANSFER: Account Name: AECOM Technical Services, Inc. Bank Name: Bank of America Address: 100 West 33rd St City/State/Zip: New York, NY 10001 Account Number: 5800937020 ABA Routing Number: 026009593 SWIFT Code: BOFAUS3N 6.6.4 Questions related to payment can be sent to: AECOM Cash Applications Supervisor by phone at (804) 515-8490 or by email at cashappsremittance@aecom.com (End of page) U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 47 Page 13 of 15

Paj 50

Client’s NameItem 5. Date AECOM Project Name: _______________ AECOM Project No.: _______________ Change Order No.: _______________ EXHIBIT C SAMPLE CHANGE ORDER FORM In accordance with the Consulting Services Agreement dated ___ 20___ between _________(“Client”), and ___________, a ________ corporation, (“AECOM”), this Change Order, with an effective date of _______________, 20______ modifies that Agreement _______________ as follows: 1. Changes to the Services: 2. Change to Deliverables: 3. Change in Project Schedule (attach schedule if appropriate): 4. Change in CONSULTANT’s Compensation: The Services set forth in this Change Order will be compensated on the following basis: [] No change to Compensation [] Time & Material (See EXHIBIT B for the Hourly Labor Rate Schedule) [] Time and Materials with a Not- to-Exceed amount of $_____. The Hourly Labor Rate Schedule is set forth in EXHIBIT B (if applicable). Reimbursable expenses are included in the overall Not to Exceed cap. [] Lump Sum $ ___________ Milestone/Deliverable & Date Payment Amount $ [] Cost Plus Fixed Fee: Cost $ _____________ and Fee $ ___________ Therefore, the total authorized Compensation, inclusive of this Change Order is $ _____________. 5. Project Impact: U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 48 Page 14 of 15

Paj 51

Client’s Name Item 5. Date 6. Other Changes (including terms and conditions): 7. All other terms and conditions of the Agreement remain unchanged. 8. Each Party represents that the person executing this Change Order has the necessary legal authority to do so on behalf of the respective Party. AECOM Technical Services, Inc. CLIENT: Signature Signature Printed Name Printed Name Printed Title Printed Title Date Date Address Address ____________________________________ ____________________________________ ____________________________________ ____________________________________ [End of Agreement] U.S. Design Engineering Services Agreement (October 8, 2018) Rev. May 11, 2020 49 Page 15 of 15

Paj 52

Item 6. ACTION FORM PROCEEDING: Council Committee of the Whole – Legislative, Finance & Administration DEPARTMENT OF ORIGIN: Police PREPARED BY: Chief Thomas Johnson / Mayor Robin Christiansen / City Manager Dave Hugg SUBJECT: Adjustment of the FY 24 Salary Scale beginning at the rank of Corporal. REFERENCE: N/A RELATED PROJECT: N/A APPROVALS: City Manager, Controller/Treasurer EXHIBITS: Proposed FY 24 Scale Chart for all FOP Ranks EXPENDITURE REQUIRED: $239,683.63 PROJECT REVENUE: None FUNDING SOURCE (Dept./Page in CIP & Budget): Personnel Budget TIMETABLE: Upon Council approval, the City Manager will execute a side letter (MOU) with the FOP to implement the proposed table beginning in FY 24. RECOMMENDED ACTION: Approve the revised table as requested. BACKGROUND The Chief of Police will be 55 years old during calendar year 2022. Long standing policy has been that no Officer shall be hired in the Dover Police Department beyond age 35 and serve beyond age 55. In 2020, the City of Dover hired Chief Johnson in a year he turned 53 years of age and it was certainly anticipated that he would not be compelled to retire under the existing policy. With that stipulated, the FOP requested impact bargaining to address the reduced promotional opportunities with Chief Johnson’s extended tenure and the anticipated change in retirement policy. Over the course of several meetings, it was also identified that current policy was also having an impact on recruitment and retention. In short, Dover PD has one of the longest timelines in Delaware to test for the non-competitive rank of Corporal. Quality candidates have reported that, among other reasons, they did not apply to Dover due to the delay in promotional opportunities. The most glaring example was the 8-year wait for Corporal. By the beginning of May, 2022 a side letter was signed that relieved Chiefs hired from outside of the Department of any age requirements, acknowledged the City’s full discretion to hire an outside Chief, and contained a commitment that the Chief, Mayor and City Manager would recommend this proposal to City Council in order to obtain the required funding. POINTS OF INTEREST Current policy allows an Officer to test for promotion to PFC after 3 years and for Corporal after 8 years. The desire is to allow PFC’s to test for Corporal after 6 years. The competitive ranks of Master Corporal and Sergeant are typically not mathematically possible until years 10 and 13 respectively under the current policy. Earning Corporal in year 7 will shorten the path to higher promotion and remove the recruitment barrier. As it relates to the development and useful tenure of senior staff, this move will ensure that the investment in supervisory, management and leadership training will pay greater dividends. In many cases, supervisors achieve staff ranks at the tail end of their careers and must be replaced. Only 1 member of the 8 staff officers under the Chief is still in the same rank since his appointment in 2020. Earlier promotions will help with this rapid turnover and ensure that the best and brightest are available for selection to the senior staff in the future. ACTION REQUESTED: The Legislative and Finance Committee and Council approve this table revision. 50

Paj 53

51 Item 6. 00'G6v yden LG'G9L'GZL 00%29'22) 00%29'/2L v0'802°0E} ¥0'802°06) clolg'lel cT'Se8'TEL LV'€GLVEL 00'G6¥'SEL 00'G6¥'SEL 00'G6¥'SEL 00'G6v'SEL 00'G6v'SEL 00'G6v'SEL 00'G6¥'SEL 00'G6¥'GEL SEL 11 00'£/272LL €C'E06'ELL LV'620°GLL OS'L8L'OLL [ZL'ee€'ZLL [95°0LG'8LL 8G'ELL'6LL 09°'916'0ZL /2'SZl'zel €0'LVE'SZL 05°08G'¥ZL 05°08S'¥ZL 05°08G'¥ZL 05°08G'¥ZL 05°08G'¥2L 05°08G'¥ZL 05°08S'¥ZL 05°08G'¥ZL 05°08G'¥ZL 0G5°08G'¥ZL [LL [ZL LL LL [ZL ZL [ZL LL LO'SLE Juswyedaq 16g L6'€¥8'E0L 98'898'%0L lC'216'G0L 92'266'90L 02°110'80L ¥€'ZYL'60L ZE€7/12°0LL SZ¥rbZLL 8Y'0LSELL 81'90L'VLL [vz'€s8'SLL 9Jeds 22110211 Z2°L10'LLL 2Z'L10°LLL VIOZLL LIOZLL LI0ZLL LIOZLL LIOZLL LIOZLL VIOZLL L10'ZLL LLL 9leog HZ PZT e910 08 v9 v9 v9 v9 v9 Ad 99'¥LS 95295 €9'/v6'L6 25'/29'G6 8L'009'96 68'6L5'86 91'815'66 1dom Lb'9LG'00L 158520 262590 051290) 9182200 LYS'.6 ¥9182°Z0L ¥9182°Z0L Aiejeg ¥9182°20L ¥9'182°70L $9182°20L ¥9'182'70L 1I9¥0L 18.200 182201 182201 18270, 18.70) Jano( LOL €0) pasodoud Jo AD 1d9 8€'60¥'88 92'/96°L6 €1'€98'26 [61L°018'C6 [S9'LEL'P6 22'829'S6 LG'GE9'96 28710926 6822586 6822586 6822586 68722586 6822586 6824586 682586 682586 6822586 6822586 682586 682586 6824586 6822586 682/586 682586 682/586 02 04d 2L1/8'69 0,199'2. 19'G8G'G/ £0'909'8, LE¥G/18 89°0c0'S8 66°088'G8 086598 0220928 0220928 0Z'209'/8 0Z',09°/8 02,0928 02'209'28 02'209°28 0220928 0220928 0220928 02'209°28 02'209°/8 02'209°28 02'20928 02'209°28 0Z'209'/8 0220928 0Z'209'/8 02'209'28 209/89 ¥206£'6S pEEES'19 829/€¢9 [01'668'G9 wpd |v [1 [2 |¢ v S 9 L 8 6 ol LL Zl cl pL Sl 91 Ll 8 61 0z [¥4 zz £Z vz SZ 9Z LZ 8z 62 0g

Paj 54

Item 6. City of Dover Police Department Salary Scale Comparison Current Salary 8,589,346.35 8,829,029.98 239,683.63 2.8% 52