Paj 1
AGENDA
CITY OF DOVER PLANNING COMMISSION
Monday, July 18, 2011 – 7:00 P.M. - City Hall: Council Chambers
PLEDGE OF ALLEGIANCE
ROLL CALL
APPROVAL OF AGENDA
ADOPTION OF MINUTES OF REGULAR MEETING of June 20, 2011
COMMUNICATIONS & REPORTS
1) The next Planning Commission Quarterly Workshop is scheduled for Tuesday, August 16,
2011 at 4:00pm in the City Hall Conference Room.
2) Report on City Council actions
3) Update on other Planning activities
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
OLD BUSINESS
1) Requests for Extensions of Planning Commission Approval:
a) C-10-02 The Arbors at 1051 College Road – Request for extension of the conditional
approval granted on August 16, 2010 by the Planning Commission to the Conditional Use
Site Plan Review to permit the construction of a 55,350 S.F. multi-family building with
48 total units (condominium style units) and associated site improvements. The project is
located on one parcel of land totaling 4.32 acres ± and is zoned RG-2 (General Residence
Zone). The subject area is located on the north side of College Road, just west of McKee
Road. The owner of record is JNK, LLC. Tax Parcel: ED-05-067.00-01-35.03-000.
Council District 1.
NEW DEVELOPMENT APPLICATIONS
1) S-11-09 State Street Plaza at 1004 S. State Street – Public Hearing and Review of a Site Plan
for the construction of a 9,942 SF office building and other associated site improvements at
1004 South State Street. The property is 0.7635 acres ± and is zoned C-2A (Limited Central
Commercial Zone). The property is located on the west side of South State Street at the
intersection with Wyoming Avenue. The owner of record is Gateway South Professional
Center, LLC and the equitable owner is ADP Properties, Inc. Property Address: 1004 South
State Street. Tax Parcel: ED05-077.17-07-21.00-000. Council District 2.
2) MI-11-06 Text Amendment: Revisions to Article 10 of the Zoning Ordinance (Appendix B)
– Public Hearing and Review for Recommendation to City Council of a series of
Amendments to the Article 10 of the Zoning Ordinance related to the procedures and
requirements for applications to the Planning Commission and Historic District Commission.
The proposed changes are aimed at improving consistency within the ordinance, clarifying
Paj 2
City of Dover Planning Commission Agenda
Public Hearing: July 18, 2011
Page 2 of 2
and streamlining review processes, removing antiquated language, and expanding public
notification requirements. Ordinance #2011-14.
NEW BUSINESS
1) Review of Draft “Policy on Physical Posting Requirements”
2) Nomination and Election of Officers (Chairman and Vice-Chairman)
3) Appointment of the Architectural Review Oversight Subcommittee of Planning
Commission (in accordance with Zoning Ordinance, Article 10 §2.28)
ADJOURN
THE AGENDA ITEMS MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE
TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Paj 3
CITY OF DOVER PLANNING COMMISSION
June 20, 2011
The Regular Meeting of the City of Dover Planning Commission was held on Monday June 20,
2011 at 7:00 PM with Chairman Hemmig presiding. Members present were Mr. Hemmig, Mr.
Tolbert, Colonel Welsh, Mr. Baldwin, Mr. Nichols, Mr. Holt, Mr. Ambruso, and Mr. Shomo.
Mr. Friedman was absent.
Staff members present were Mrs. Melson-Williams, Mrs. Duca, Ms. Cornwell, Mr. Albert and
Ms. Metsch. Also present were Mr. Rick Gould, Mr. Mike Henry, Mr. Rich Vetter, Mr. Ryan
Becraft, Mr. Michael Cassidy, and Mr. Constantine Malmberg. Also speaking from the public
was Dr. Steven Schlesinger.
APPROVAL OF AGENDA
Mr. Tolbert moved to approve the agenda as submitted, seconded by Mr. Holt and the motion
was unanimously carried 8-0 with Mr. Friedman absent.
APPROVAL OF THE PLANNING COMMISSION MEETING MINUTES OF MAY 16,
2011
Colonel Welsh moved to approve the regular Planning Commission meeting minutes of May 16,
2011, seconded by Mr. Tolbert and the motion was unanimously carried 8-0 with Mr. Friedman
absent.
COMMUNICATIONS & REPORTS
Mrs. Melson-Williams stated that the next Quarterly Workshop is scheduled for Tuesday, August
16, 2011 at 4:00 PM in the City Hall Conference room.
Mrs. Melson-Williams further stated that an APA Audio Web Conference regarding the 2011
Planning Law Review session will be held on June 29, 2011 at 4:00 PM. This audio web
conference is hosted at the Kent County Administration Building in Room 220. The event would
be co-sponsored by the Delaware Chapter of the APA and the Kent County Planning Office.
Mrs. Melson-Williams provided an update on the regular City Council meeting of May 23, 2011,
and the regular City Council, Utility Committee, the Parks Recreation and Community
Enhancement Committee, and the Legislative, Finance and Administration Committee meetings
of June 13, 2011.
Mrs. Melson-Williams further stated that included in the Planning Commission packets were
some sheets that need to be inserted into your 2008 Comprehensive Plan. These are 2011
Comprehensive Plan Amendments that were approved by City Council in March and April of
this year. There were some text pages that were updated as well as the Land Development Plan
Map 12-1.
OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS
Mrs. Melson-Williams presented the audience information on policies and procedures for the
meeting.
Paj 4
CITY OF DOVER PLANNING COMMISSION JUNE 20, 2011
OLD BUSINESS
S-10-13 YMCA at 1137 South State Street – Request for extension of the conditional approval
granted on June 21, 2010 by the Planning Commission to the Site Development Master Plan for
the construction of three separate building additions to the existing YMCA building located 1137
South State Street and associated site improvements. The three building additions are proposed
in phases with Phase 1: Gymnasium at 9,250 S.F., Phase 2: Fitness Addition at 3,030 S.F., and
Phase 3: Program Space at 6,500 S.F. in size. The project is located on three parcels of land
totaling 4.4196 acres ± proposed for consolidation into one parcel as part of this application. The
properties are currently zoned IO (Institutional/Office Zone) and RGO (General Residence and
Office Zone. The owners of record are YMCA of Dover, Inc. and Young Men’s Christian
Association of Delaware, Inc. Property Addresses: 1137, 1145, and 1169 South State Street. Tax
Parcels: ED05-077.17-05-01.00-000, ED05-077.17-05-57.00-000, and ED05-077.17-05-58.00-
000. Council District 2.
Representatives: Mr. Rick Gould, YMCA; and Mr. Mike Henry, Becker Morgan Group, Inc. were
present in the audience.
Mrs. Melson-Williams provided an overview for the request of extension for this application.
There were no questions raised from any Planning Commission members at this time.
Mr. Hemmig questioned if there would be any items that would affect the extension with regards to
changes in the Zoning Ordinance? Responding to Mr. Hemmig, Mrs. Melson-Williams stated that
no not with regards to the I/O (Institutional/Office) zoning district that this project is currently
located in.
Colonel Welsh moved to approve a one year extension for S-10-13 YMCA located at 1137 South
State Street, seconded by Mr. Nichols and the motion was unanimously carried 8-0 with Mr.
Friedman absent.
NEW DEVELOPMENT APPLICATIONS
C-11-04 M & L Ventures, LLC at Lafferty Lane – Public Hearing and Review of a Minor
Subdivision and Conditional Use Site Plan to create two parcels of 5.46 ± acres and 4.13 ± acres for
the construction of a total of ten 9,950 SF manufacturing/warehousing buildings on two parcels
(after subdivision) and other associated site improvements at Lafferty Lane. The property is
currently 9.99 acres ± and is zoned M (Manufacturing Zone) and is subject to the AEOZ (Airport
Environs Overlay Zone) APZ 1 and Noise Zones C and D. The property is located on the south
side of Lafferty Lane west of Horsepond Road. The owner of record is M & L Ventures, LLC.
Property Address: Lafferty Lane. Tax Parcel: ED05-077.00-01-28.04-000. Council District 2.
Waivers Requested: Reduction of Bicycle Parking, Partial elimination of curbing, and Partial
Elimination of Sidewalk. Previously, application C-09-03 was reviewed by the Planning
Commission in March 2009 and January 2010; however, that plan has expired.
Representatives: Mr. Rich Vetter, RK&K Engineers; Mr. Ryan Becraft, RK&K Engineers; and
Mr. Michael Cassidy, M&L Ventures.
2
Paj 5
CITY OF DOVER PLANNING COMMISSION JUNE 20, 2011
Ms. Cornwell provided an overview of the application.
There were no questions raised from any Planning Commission members at this time.
Mr. Hemmig opened a public hearing and after seeing no on wishing to speak closed the public
hearing.
Mr. Hemmig questioned if there was a recommendation for an increase in bicycle parking?
Responding to Mr. Hemmig, Mrs. Melson-Williams stated that yes; the Planning Staff
recommended that at least two (2) bicycle parking spaces be provided. The applicant was
requesting a full elimination of the requirement.
Colonel Welsh moved to approve C-11-04 M & L Ventures, LLC located at Lafferty Lane with the
waiver requests granted for the sidewalk, elimination of curbing, and to amend the requirement
of two (2) bicycle parking areas, seconded by Mr. Nichols and the motion was unanimously
carried 8-0 with Mr. Friedman absent.
C-11-03 Governors Club Professional Center at 144 Kings Highway – Public Hearing and
Review of a Conditional Use Site Development Plan to permit the establishment of a café/sandwich
shop in a portion of the first floor of an existing building. The property is zoned RGO (General
Residence and Office Zone) and H (Historic District Zone). The property is located at the
southernmost intersection of American Avenue and Kings Highway. The owner of record is
Governors Club Professional Center, LLC and the lessee is Coffee Shop, LLC. Property Address:
144 Kings Highway SW. Tax Parcel: ED05-077.05-04-40.00-000. Council District 2.
Representative: Mr. Constantine Malmberg, Attorney representing the Applicant.
Ms. Cornwell provided an overview of the application.
Mr. Malmberg stated that the owner of this coffee shop has been a manager of McGlynn’s Pub
and was the one who got the operation up and running here in Dover. He has been in the
restaurant business for twenty (20) years and is an operator that should know what he is doing.
The intended use as indicated by Staff is a coffee shop where sandwiches for lunch or coffee in
the early morning to serve DNREC, Wesley College students, and that type of clientele. It is not
anticipated that there would be much in the way of evening hours other than in connection with
events held at the Schwartz Center where it might be appropriate for Friday and Saturday night
ice cream with the kids after dinner.
Mr. Malmberg further stated that as Staff indicated, this is a preferred Conditional Use in this
district. The idea as set forth in the Code is to try and encourage tourism uses in Downtown with
more vitality by interjecting some commercial uses into the office district that represents the
Historic District.
Mr. Holt questioned regarding the business, is the owner contemplating staying with those hours
or having it open for certain events Downtown? Responding to Mr. Holt, Mr. Malmberg stated
that the concept is 7:00 AM through lunch most weekdays that would cater to the business in
Downtown Dover. On Friday and Saturday nights, they will try to pick up some theater traffic
3
Paj 6
CITY OF DOVER PLANNING COMMISSION JUNE 20, 2011
for dessert as they will be serving gelato along with coffee and a sandwich shop.
Mr. Holt further stated that he feels that this is going to be a good fit and would even suggest that
they have some outdoor seating. Responding to Mr. Holt, Mr. Malmberg stated that there is a
plan for some seating out on the deck porch. This will be an old style coffee house because the
ceilings in this building are fourteen (14) to sixteen (16) feet in height and should make a very
nice shop.
Mr. Nichols questioned with regards to the floor plan, will it have to be revamped or remodeled
to accommodate this sandwich shop? Responding to Mr. Nichols, Mr. Malmberg stated that they
submitted a floor plan for the proposed use. There will be no changes in any of the walls and no
significant improvements at all to the facility other than those associated with the restaurant use
which would be sinks and running water. There are no hoods required and not contemplated at
this time. This is a fairly low intrusive use into the historic structure. They would need to set up
the tables, counters, and wash sinks.
Mr. Nichols questioned that one bathroom is shown on the plan. Will this be a co-ed bathroom?
Responding to Mr. Nichols, Mr. Malmberg stated that this is an existing bathroom that is
handicap accessible and yes, it is a co-ed bathroom.
Mr. Nichols further questioned if there would be a handicap ramp? Responding to Mr. Nichols,
Mr. Malmberg stated that they are going through an analysis with the Building Code Department
on accessibility for the property and whether or not it is feasible. The Building Code requires
that a handicap ramp be put in unless it is not feasible to put one in. Currently, unless the
architect comes up with some better plans, it would destroy the front porch because of the
requirements of ramping and the like. Staff, the applicant, and I will all meet on site next week
to review possibilities and see how feasible it would be. This is a fairly small user and
depending upon how extravagant it is to get up this high on a historic structure, a lot of things
could happen such as architectural review through the Historic District Commission if there is
extensive ramping or extensive cost for what is a third of the building with the remaining uses
staying the same.
Mr. Hemmig opened a public hearing.
Dr. Steven Schlesinger – Stated that he owns the building that is adjacent across the alleyway
from the Governors Club. The building is currently zoned RGO and the buildings that surround
the property are mostly RGO. Residences line Kings Highway across the street from the
property and offices line American Avenue across from this property. His property which shares
the alley with the Governors Club, is both office and residential. The question that needs to be
asked in order for the Conditional Use permit to be granted in the Historic District is “Does a
coffee/sandwich shop make this a greater attraction to tourists and residents?” He does not think
that it does. There is already ample opportunity for this type of business in the Downtown area
with the zoning already in place on Loockerman Street west of State Street where there are at
least five (5) or six (6) empty stores. On the second block, the empty stores outnumber the
occupied stores. A coffee shop or sandwich shop could do quite well there on New Street,
Governors Avenue, or on State Street. Remember the business Mort’s Deli use to have. The
proposed Governors Club would seat approximately fifty (50) people and have shifts of Staff to
4
Paj 7
CITY OF DOVER PLANNING COMMISSION JUNE 20, 2011
run the facility. Parking is already pressured in this area especially with the loss of City Hall
parking and construction of the new library. The idea that most patrons would be on foot he
believes is hellatious and thus if only half of the seats were filled with drivers, then twenty-six
(26) parking spaces would be necessary. You have heard that there are nine (9) spaces on the
circle and there are eight (8) out back with two (2) of those in an enclosed garage that would
have a parked car behind them. The garage spaces are inadequate to hold the two (2) cars that
people would be using. Staff would park in the alley near the kitchen where the blueprints state
that there are eight (8) parking spaces that includes two cars in the garage. First of all, the garage
does not accommodate the two cars and any cars parked in the garage would be blocked in and
could not get out with the three to four cars parked in the area. If there was a Staff of six per
shift, there is insufficient parking even for that shift never mind the overlap in Staff during a shift
change. Add to that, this is a three story building where most tenants park in the back of the
building and you can see the quandary we face about parking. Also bear in mind that this is an
alley and not a City street. In years past, without a retail establishment in the building, vehicles
have blocked in the driveway, parked, and left their cars blocking the alley. They also park in
the adjacent City Park which is an open space across from the Governor’s Mansion. This
adjacent park in the past has had grass destroyed by various construction company trucks that
park there that was not relative to them doing construction; he believes that they had offices in
this building. In additional to all of that, the plan is to have them taken out. Are customers
expected to find a parking spot, go into the building and order? If this is the case why not eat in
there or go up the alley and leave the car and just run in.
Dr. Schlesinger further stated that he believes that there are issues with regards to health which is
associated with odor generated by the restaurant’s open garbage receptacle which would be a
focus of odors and certainly animals, flies, and maggots. This garbage receptacle is less than
twenty-five (25) feet from another apartment. Parties of this facility in the past have resulted in
garbage bagged and placed in this three sided brick space which is fully open on one side for
pickup. Full receptacles with sloppily placed garbage bags not in the proper cans would
certainly be a health hazard. Besides the issues of parking and garbage removal, the operating
hours would pose an additional nuisance. The place would be staffed every day as proposed
7:00 AM to 7:00 PM with customers leaving later and the Staff arriving earlier causing
significant noise, traffic, and lighting disturbance. The traffic and noise in this alley is not
compatible with the current neighborhood’s residential and business schedule and traffic
patterns. Certainly, having this facility less than fifty (50) feet from an apartment will limit
anyone’s interest in living in the apartment and will adversely affect his property’s value as well
as upset the current neighborhood’s quiet Victorian appeal. Why disturb a successful
neighborhood when there is an area that would welcome this new business? Why should
historical Downtown businesses such as himself pay taxes to downtown development for many
years and now be blessed by planning to be met with nuisance of traffic, garbage disposal issues,
increased parking as a reward for accepting additional taxation as we are in the historical
Downtown Dover district. As the extent of this plan proceeds and as renovation has already
begun, without the acceptance of this Plan, he believes that the entire neighborhood will look
differently with this proposed Plan when you see the overall ambitious projected plans. This
coffee shop bares no benefit where it is planned versus a better location of being on Loockerman
Street where the shop would be welcome and could draw additional traffic.
5
Paj 8
CITY OF DOVER PLANNING COMMISSION JUNE 20, 2011
Dr. Schlesinger further stated that he is also concerned regarding the handicap ramp. There was
a space and a half out back that was made for handicap vehicles. If a ramp were to be placed
there is would cause that space there to be one and a half spaces lost out back to the existing
which is still way too few for what is needed. He would welcome anyone to drive up the
alleyway to see if you think that nine (9) cars could get into this space and if nine (9) spaces
would even be adequate. Thank you for your patience in listening to his opinion on this poorly
fit plan into the existing Historic District. It is a squeeze in the neighborhood with all the
nuisance, hygiene issues, odor, and increase in traffic which could potentially be dangerous as
cars come out of the alleyway much more frequently onto Division Street and find themselves
with ongoing traffic from west to east which is always a hard block to get out onto. There is also
an increase in trespassing which he would not look forward to. We have four (4) spaces towards
the back and we would have to block it off because we know what would happen if we did not,
those spaces would not be available. Personally, it is his feeling that this is not a benefit to the
area as it does not fit the area. We already have an existing area that is not being developed and
this would be a disturbance to the existing neighborhood with unwelcome noise disturbing
markably increased hours.
Mr. Hemmig closed the public hearing after seeing no one else wishing to speak.
Mr. Hemmig stated that Dr. Schlesinger addressed the possibility of garbage. If there is a
problem with garbage, this would be addressed through Code Enforcement with the City of
Dover. As far as the business aspect, he personally feels that it is a good fit for this area and the
uniqueness of the building lends a lot of ambiance to the potential of the café.
Colonel Welsh stated that he agreed with Mr. Hemmig’s comments and while he empathizes
with Dr. Schlesinger and listened to his concerns, he is also aware through Code Enforcement
there are a lot of his concerns that could be resolved if in fact they do become concerns.
Colonel Welsh moved to approve C-11-03 Governors Club Professional Center located at 144
Kings Highway as requested, seconded by Mr. Nichols and the motion unanimously carried 8-0
with Mr. Friedman absent.
Meeting Adjourned at 7:32 PM
Sincerely,
Diane Metsch
Secretary
6
Paj 10
City of Dover
DATA SHEET FOR SITE PLAN REVIEW
DEVELOPMENT ADVISORY COMMITTEE MEETING OF July 7, 2011
PLANNING COMMISSION MEETING OF July 18, 2011
Plan Title: State Street Plaza
S-11-09
Plan Type: Site Plan
Property Location: Southwest corner of South State Street and Wyoming Avenue.
Property Address: 1004 South State Street
Tax Parcel: ED-05-077.17-07-21.00-000
Owner: Gateway South Professional Center, LLC
Project Engineer: Larson Engineering
Site Area: 0.7635 +/- ac.
Proposed Use: Medical Office Building
Building Area: Proposed Building – 9,945 S.F.
Impervious Area: Proposed – 82.5%
Off Street Parking: Required – 34 (1 per 300 S.F. of floor space)
Proposed – 36 spaces
Sewer & Water: City of Dover
Zoning Classification: C-2A (Limited Central Commercial Zone)
Waiver Requested: Partial Elimination of Curbing
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Paj 11
DAC Report S-11-09 State Street Plaza
July 7, 2011
Page | 2
C P
CITY OF DOVER I L
T A
DEVELOPMENT ADVISORY COMMITTEE Y N
N
APPLICATION REVIEW COMMENTARY O I
F N
D.A.C. MEETING DATE: July 7, 2011 G
D
O
V
APPLICATION: State Street Plaza at 1004 South State Street E
R
FILE #: S-11-09 REVIEWING AGENCY: City of Dover Planning
CONTACT PERSON: Janelle M. Cornwell, AICP PHONE #: (302) 736-7196
PLAN SUMMARY:
This Site Plan Review is to permit the construction of a 9,945 S.F. medical office
building. The project area consists of one (1) parcel of land totaling 0.7635 acres ±. The
property for the proposed development is zoned C-2A (Limited Central Commercial
Zone). The property is located on the southwest corner of South State Street and
Wyoming Avenue. The owner of record is Gateway South Professional Center, LLC.
The property address is 1004 South State Street. Tax Parcel: ED-05-077.17-07-21.00-
000.
The site was previously reviewed and approved for retail use by the Planning
Commission in 2008 (S-07-61). The Site Plan expired prior to construction commencing
on February 28, 2010.
PARKING SUMMARY
The minimum parking requirements for the C-2A (Limited Central Commercial Zone) is
one (1) parking space for every 300 S.F. of floor area. The calculation for a medical
office building is also one (1) parking space for every 300 SF of floor area. Based on the
size of the building (9,945 S.F.) the site requires thirty-four (34) parking spaces. The
plan indicates thirty-six (36) new parking spaces for the proposed building of which two
(2) are handicap parking spaces. The Plan exceeds the parking requirements of the
Zoning Ordinance based on the floor area of the proposed building and is under 25% of
the maximum amount of parking allowed.
BUILDING ARCHITECTURE
The building appears to be predominately brown brick with window storefronts. The
exact materials need to be identified on the elevations. The building will have a flat roof
with three pitched entrance features around the building. There are columns dividing the
storefronts. The back of the building is a blank block building with a brick water table
feature. Large expanses of blank wall are to be avoided per Zoning Ordinance Article 5
Paj 12
DAC Report S-11-09 State Street Plaza
July 7, 2011
Page | 3
Section 19. If significant changes are proposed to the architecture the architecture will be
reviewed by the Planning Commission at a future meeting.
SITE CONSIDERATIONS
Dumpster
The building is required to have two (2) dumpster pads based on the size of the building.
Article 5 Section 6.12 requires one dumpster pad is for the first 8,000 S.F. of gross floor
area and a second dumpster pad is required for each additional 16,000 S.F. of gross floor
area or fraction thereof. The Site Plan identifies one dumpster pad location. The
dumpster pad is located along the west side of the site across from the entrance off of
Wyoming Avenue. The second dumpster location shall be reserved on site and will be
required to be constructed if determined to be necessary by the Planning Director. The
dumpster enclosure material shall match the proposed building.
Loading Space
Based on the size of the building (9,945 S.F.) a loading space is not required; however, a
loading space is provided on the plan.
Sidewalks
Article 5 §18 requires sidewalks to be installed along the public street frontages of a
property. The plan shows an existing sidewalk along Wyoming Avenue and South State
Street. The plan indicates an entrance into the site along both street frontages.
Waiver Requested - Curbing
Article 6 § 3.6(b) requires curbing for all parking areas. Upright curbing is provided on
the site. The plan indicates two small depressed areas along the north edge of the parking
lot to allow for drainage into the stormwater management area. A waiver may be granted
by the Planning Commission to allow for drainage into the stormwater management area.
A written waiver request for the depressed curbing to allow for drainage into the
stormwater management area has been submitted for consideration by the Planning
Commission.
Opaque Barrier
An opaque barrier is required when a non-residential use abuts a residential use (Article 5
§7.2). For this project, this occurs on a portion of the west property line as the site abuts a
residence (Lands of James Norton). An opaque barrier consists of an opaque component at
least six (6) feet in height (a wooden fence, masonry wall or earthen berm). The Planning
Commission has the ability to waive the requirement for the opaque barrier component
consisting of the wooden fence, masonry wall or earthen berm. A landscape barrier
consisting of either a continuous evergreen planted screen at least six (6) feet in height when
planted or a hedge that will grow to be at least six feet is required as a part of the buffering
for the parcel abutting a residential use. The landscape portion of the buffer is required to be
planted on the residential side of the opaque barrier. The plan proposes both the fence and
landscaping.
Paj 13
DAC Report S-11-09 State Street Plaza
July 7, 2011
Page | 4
TREE PLANTING AND LANDSCAPE PLAN
The submitted plan does include the requisite Landscaping Plan elements. Based on the
total project site area of 33,258 S.F., twelve (12) trees would be required. The plan
shows the required number of trees. The trees are a mixture of deciduous trees. The trees
are located around the perimeter of the site with two trees located within the parking
island.
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE,
PLAN CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS
AGENCY’S AUTHORITY AND AREA OF EXPERTISE.
CITY AND STATE CODE REQUIREMENTS:
1) Curbing shall be constructed in accordance with the Zoning Ordinance unless a
waiver is granted by the Planning Commission. A written waiver request for the
elimination of curbing has been submitted for consideration by the Planning
Commission.
2) Revise the projected water uses to reflect the proposed office use on the Utility Plan
Sheet.
3) Update the Data Column on the Title Sheet and Site Plan Sheet with the following
information:
a) Any changes recommended or other approval by the Planning Commission.
b) Any waiver granted by the Planning Commission.
c) Revise the existing use to vacant.
d) Remove the existing building area.
e) Provide the equitable owner information on the Title Sheet.
f) Provide a note stating that trash pickup will be private.
4) Provide a construction detail for the following items but not limited to: the proposed
pole mounted lights, etc.
5) Revise the Landscape Plan with the following:
a) Ensure the base map for the Landscape Plan matches the remainder of the
Plan Sheets. The placement of the building is located differently.
b) Clarify the number of Dwarf Garden Juniper plants on the site. The Plant List
indicates 57 plants; however, there are only 35 plants shown on the plan.
c) Clarify the label and symbol 7 IC located on the west property line. The plan
indicates seven trees or plants; however, there they are not listed in the Plant
List.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET
CODE OBJECTIVES:
1) Recommendation on waiver:
Paj 14
DAC Report S-11-09 State Street Plaza
July 7, 2011
Page | 5
a. Partial Elimination of Curbing: Staff recommends approval of the request
to eliminate curbing in several places in the parking lot on the north side to
allow for drainage into the stormwater management area.
ADVISORY COMMENTS TO THE APPLICANT:
1) Approval for the Stormwater Management Area was granted approval in
December of 2008 by the Kent Conservation District. Their approval is valid for
three (3) years and would expire in December of 2011. The applicant shall
contact the Kent Conservation District to ensure the validity of the Stormwater
Management Plan and discuss its relevance to the current application.
2) In the event, that major changes and revisions to the Site Plan occur in the
finalization of the Site Plan contact the Department of Planning and Inspections.
Examples include reorientation of building, relocation of site components like
stormwater management areas, and increases in floor area. These changes may
require resubmittal for review by the Development Advisory Committee,
Planning Commission, or other agencies and commissions making
recommendations in regards to the plan.
3) Staff recommends the applicant consult with DNREC regarding the previous
removal of underground storage tanks.
4) Other agencies and departments which participate in the Development Advisory
Committee may provide additional comments related to their areas of expertise
and code requirements.
5) Following Planning Commission approval of the Site Plan, the Plan must be
revised to meet all conditions of approval from the Development Advisory
Committee or as otherwise noted. A Check Print must be submitted for review by
Planning Office Staff also submit to other DAC member agencies. Upon
determination that the Plan is complete and all agency approvals have been
received, copies of the Plan may be submitted for final endorsement and DAC
member agencies with comments.
6) The applicant/developer shall be aware that prior to any ground disturbing
activities on the site the appropriate site inspections and permits are required.
7) Construction may have an effect on the adjacent property owners and nearby
travel lanes. Any work requiring the closing or rerouting of potential customers
or visitors to adjacent properties should be coordinated as to offer the least
amount of inconvenience to the adjacent property owners.
8) A City of Dover Pre-Construction meeting will be required prior to a Notice to
Proceed letter being issued for construction to commence.
Paj 15
DAC Report S-11-09 State Street Plaza
July 7, 2011
Page | 6
9) The applicant shall be aware that Site Plan approval does not represent a Sign
Permit, nor does it convey permission to place any sign on the premises. Any
proposed site or building identification sign shall require a Sign Permit from the
City of Dover prior to placement of any such sign.
10) The applicant shall be aware that Site Plan approval does not represent a Building
Permit and associated construction activity permits. A separate application
process is required for issuance of a Building Permit from the City of Dover.
If you have any questions or need to discuss any of the above comments, please call
the above contact person and the Planning Department as soon as possible.
Paj 16
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
APPLICANT D.A.C. MEETING DATE: JULY 7, 2011
APPLICATION: State Street Plaza at 1004 S. State Street
FILE #: S-11-09
REVIEWING AGENCY: City of Dover Public Utilities Department
CONTACT PERSON: Steve Enss - Electric
Sharon Duca, P.E. - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC
1. The roadway and curbing must be in.
2. The right-of-way must be within 6" of final grade.
3. The property corners must be staked.
4. Owner is responsible for locating all water, sewer, and storm sewer lines.
5. Owner is responsible for installing all conduits and equipment pads per the City of Dover Engineering Department
specifications.
6. Owner is responsible for site and/or street lighting.
7. Meter locations will be determined by City of Dover Engineering Department.
8. Load sheets and AutoCAD compatible DXF or DWG diskettes of site plans, including driveways, are required prior to
receiving approved electrical construction drawings.
9. Any relocation of existing electrical equipment will be engineered by the City of Dover Electric
Department. Developer may be required to perform a quantity of the relocation. Any work performed by the
City of Dover will be at the owner’s expense.
10. Prior to construction, owner is responsible for granting an easement to the City of Dover Electric
Department. Easement forms will be furnished and prepared by the City of Dover Electric Engineering Department.
11. Fees will be assessed upon final site plans. The owner will be responsible for fees assessed prior to
construction. Owner is required to sign off plans prepared by the Electric Department.
12. Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric
Engineering Department.
13. Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric
Engineering Department with a physical address of the property.
14. All Engineering and design for Dover Electric will be engineered upon final approved plans. All Engineering work will
be furnished by the City’s Electric Engineering Department.
Paj 17
State Street Plaza
File #: S-11-09
July 7, 2011
Page 2 of 4
WATER
1. The following notes must be added to the plans:
a. All water utility components must meet the requirements of the Public Utilities Water Wastewater Handbook,
effective date March 22, 2010.
b. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the
project.
c. Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in
accordance with the City of Dover Public Utilities Department specifications and requirements.
d. The site contractor shall contact the City of Dover Public Utilities Construction Manager at (302) 736-7070 prior to
the start of construction. A representative from the City of Dover Department of Public Utilities must observe and
approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed
by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted
in the field due to conditions of the existing main. Possible conditions that would require tapping relocation
include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test
holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be
held responsible for field conditions requiring adjustment of the tapping location or for any work required by the
contractor to make an appropriate and lawful connection.
2. The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
3. Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine
the size of the domestic and irrigation (if applicable) water meter for the proposed building. These projections must be
submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meter must be
installed in a pit outside the building in a non-traffic bearing area (which includes vehicular, bicycle and pedestrian
traffic) per City of Dover requirements and manufacturer’s recommendations. Also, a dual check valve is required
downstream of the meter.
4. The plan for the site references a one-inch (1”) domestic service for the site. Based upon the usage currently
projected for this site, it is unlikely that the size(s) shown will be adequate. Calculations determining the service line
size must be submitted to our office for review.
5. The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be
installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically
this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the
domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the
building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap
and valve are located within five feet (5’) to ten feet (10’) of the building. A blow up detail of this layout is
recommended.
6. Provide a construction detail, meeting City of Dover requirements, for the proposed restraining system for the fire
main located within the buildings. The Public Utilities Department will test and inspect all fire mains to a blind flange
located inside the buildings. The blind flange with tap is used for hydrostatic pressure testing (200 psi for two (2)
hours) and dechlorination. The flange must be restrained in the direction of the pipe entering the facility. A pipe
entering horizontally through a wall sleeve shall be restrained with rods through the wall. A pipe entering vertically
through a slab shall be restrained through the floor to the ninety degree (90°) bend and thrust block. All rods shall be
a minimum of ¾” all thread. All pipes through walls and slabs must be Class 52 cement lined ductile iron pipe.
Confirm particulars to meet this requirement with mechanical designer.
WASTEWATER
1. The following notes must be added to the plans:
a. All wastewater utility components must meet the requirements of the Public Utilities Water Wastewater Handbook,
effective date March 22, 2010. Please contact our office for more information.
b. Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the
mains in accordance with the City of Dover Public Utilities Department specifications and requirements.
Paj 18
State Street Plaza
File #: S-11-09
July 7, 2011
Page 3 of 4
c. Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall
discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff,
subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any
sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as
“…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes,
exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no
illegal discharges to the sanitary sewer system are created with the site improvements.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines.
Rim and invert elevations must be labeled on all sanitary structures.
3. Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the
right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty
cast iron frame and cover to prevent damage to the cleanout and lateral.
STORMWATER
1. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control
Plan from Kent Conservation District submitted to our office.
2. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim
and invert elevations must be labeled on all stormwater structures.
GENERAL
1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and
practices. This must be included as a note on the plan.
2. The final site plan must be submitted in a digital format compatible with AutoCAD 2010 (.dwg format).
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC
1. Owner must give the City of Dover Electric Department three (3) months notice prior to construction. Owner is
responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is
now available on the website at the following link: http://www.cityofdover.com/departments/electric/documents/.
WATER / WASTEWATER / STORMWATER / GENERAL
1. None.
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC
1. While reviewing the plan, the Electric Division has noticed that the plan has very little real estate for the electrical
equipment required to feed the proposed building.
WATER
1. Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Public Utilities
Department directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the
site.
WASTEWATER / STORMWATER
1. None.
Paj 19
State Street Plaza
File #: S-11-09
July 7, 2011
Page 4 of 4
GENERAL
1. The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be
abandoned, flowable fill may be required.
2. All standard notes and details provided on the plan shall be in accordance with the Water / Wastewater Handbook.
3. Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed
within the plan set and accordingly identified within an itemized response letter.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Paj 20
C F
I I
CITY OF DOVER T R
Y E
DEVELOPMENT ADVISORY COMMITTEE
O M
APPLICATION REVIEW COMMENTARY F A
R
D.A.C. MEETING DATE: July 7, 2011 D S
O H
V A
E L
R
APPLICATION: State Street Plaza 1004 S. State Street____________________________
FILE #: S-11-09 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal
CONTACT PERSON: David Truax, Fire Marshal PHONE #: (302) 736-7011
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY,
AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF
EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY
THE APPLICANT:
CITY AND STATE CODE REQUIREMENTS:
1. Proposed building is single story. Primary fire lanes are required to be 24 feet wide and
cover the side of the building that has the primary entrance and exit. Secondary fire lanes
can be reduced to 16 feet wide. Both can be no closer than 10 feet to the building and no
farther than 50 feet from the building. Submitted fire lane coverage is fine; the plan
needs to show the markings of the fire lane.
2. Any gas fired HVAC equipment must be equipped with emergency cut off switches
remotely located.
3. Address numbers of at least 12 inches in height must be placed on the street side of the
building visible from the street.
4. Any natural or LP gas bottles, meters, values, regulators, etc., must have impact
protection.
5. Full building and fire plan review is required.
6. Building cannot be occupied or construction or renovations started until completion of
building and fire plan review.
Paj 21
DAC Report
State Street Plaza
1004 S. State Street
Page 2
7. All required means of egress shall have an exit discharge consisting of a non slip surface
and leading to and terminating at a public way.
8. Understanding is that this is to be a dental practice. If more than 3 persons are incapable
of self-preservation the occupancy would have to be reviewed as ambulatory health care
and would require review by the State FMO for Center for Medicaid and Medicare
Services.
9. Knox Box required. If fire protection is installed.
10. Project to be completed per approved Site Plan.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
NONE
ADVISORY COMMENTS TO THE APPLICANT:
1. After any application has been approved by the Planning Commission, the applicant has a
maximum of thirty (30) days to appeal to the Code Board of Appeals Committee.
2. All comments from this office, approved by the Planning Commission are at the expense
of the owner/applicant.
3. The proposed building will be reviewed under Business Occupancy.
4. The City of Dover uses the 2009 NFPA Life Safety Code, 2009 IBC, latest editions of all
other NFPA Codes and the 2009 Delaware State Fire Prevention Regulations.
5. The Dover Fire Department request that a 8 ½ X 11 copy of the floor plan and site plan
be submitted to Station 1, attention Fire Chief, prior to the Certificate of Occupancy
being issued.
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the Planning Department as soon as possible.
Paj 22
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: June 30, 2011 T
===============================================================
APPLICATION: State Street Plaza at 1004 S. State Street
FILE#:S-11-09 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. In order to be issued an entrance permit, the department will require the applicant to
provide the proper forms, fees, and plans.
2. Per Section 3.6.5 of the Standards and Regulations for Subdivision Streets and State
Highway Access Adopted February 15, 2010, an 80-foot wide right-of-way (40-feet
from the centerline) is required for a minor arterial. According to the Kent County
Classification Maps, KCR 025 (South State Street) is classified as a minor arterial
road. If the existing right-of-way does not have the proper width along the frontage of
the site, the department will require 40-feet of right-of-way dedication from the
innermost edge of the through lane for public use.
3. The developer shall perform all of the off-site improvements and the signal
modification as noted in the approved entrance plans dated April 23, 2009.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Paj 23
CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
APPLICATION REVIEW COMMENTARY Planning
D.A.C. MEETING DATE: 7/7/2011 Organization
APPLICATION: State Street Plaza at 1004 South State Street
FILE #: S-11-09 REVIEWING AGENCY: Dover/Kent County MPO
CONTACT PERSON: Jim Galvin, AICP PHONE #: (302) 387-6030
The Dover/Kent County MPO has participated in the State’s Preliminary Land Use Services
(PLUS) process. The MPO requested the opportunity to bring the recommendations on issues
of our concern to the City as well. The MPO will limit comments to development proposals and
applications that may lead to new development. Issues of concern to the MPO are effective
transit, reducing the amount of vehicle emissions by shortening or eliminating trips, and
facilities for alternative modes of transportation, including bicycle and pedestrian access. The
MPO considers the bicycle facilities required by the City of Dover to be the standard for all
applications, not to be waived.
City of Dover Planning Commission 7/18/2011
Project Review
S-11-09 State Street Plaza at 1004 South State Street
The South State Street location is a commercial node less than one mile from The Green in
downtown Dover. As such, many facilities exist for alternative modes of transportation as well
as vehicle access. The Project is within 150 yards of two transit stops for several bus routes. It
has sidewalks at both road frontages and into the site at the entrance driveways. There are
site-based bicycle facilities indicated in the plans.
The site meets the standards the MPO considers. We have no objection.
If you have any questions or need to discuss any of the above comments,
please call the above contact person and the Planning Department as soon as
possible.
Paj 25
PETITION TO AMEND ZONING ORDINANCE TEXT
Public Hearing before the
Dover Planning Commission
July 18, 2011
Proposed Zoning Change: Amendment to Appendix B – Zoning, Article 10 – Planning
Commission, and Appendix F – Fees and Fines
Summary of Amendment: Last year, the City Council assigned two goals to the Planning Office,
including streamlining of our application processes and expansion of our
public notice requirements. To meet this goal, the Planning Office began
a thorough review of Article 10 of the Zoning Ordinance. This article
specifies the requirements for all applications that appear before the
Planning Commission and Historic District Commission, as well as
administrative plan review and amendments to the Zoning Ordinance. In
reviewing the article, the staff worked to improve the consistency
throughout sections of the article, standardize processes where possible,
and streamline zoning review for small projects and changes of
occupancy that do not include site disturbance.
The Planning Office released a draft ordinance in late April and held
subsequent meetings with the real estate, development, and engineering
communities. The draft ordinance was also shared with the Historic
District Commission. Overall feedback has been positive. Comments
received are attached. Many of the questions asked at the outreach
meetings related to the physical posting requirement.
On June 13, 2011, following review by the Legislative, Finance and
Administration Committee, the Committee endorsed the ordinance with
the Staff recommendations regarding the comments received
incorporated.
Ordinance Number: 2011-14
File Number: MI-11-06
Attachments: Ordinance #2011-14
Summary of Proposed Changes to Zoning Ordinance
Code Mark-Up
Summary of Comments Received
Comments Received
DAC Agency Comments
Paj 26
FIRST READING
CITY OF DOVER
ORDINANCE #2011-14
1 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
2 COUNCIL MET:
3 That Appendix B - Zoning, Article 10 – Planning Commission be amended by deleting it in its
4 entirety and replacing it with the following:
5 ARTICLE 10. PLANNING COMMISSION
6
7 Section 1. Approval of conditional uses.
8 On application and after public notice and hearing, the commission may authorize the issuance
9 by the city planner of permits for any of the conditional uses for which this ordinance requires, in
10 the district in which such use is proposed to be located. In approving any such use, the planning
11 commission shall take into consideration the public health, safety and welfare, the comfort and
12 convenience of the public in general and of the residents of the immediate neighborhood in
13 particular, and may prescribe appropriate conditions and safeguards as may be required in order
14 that the results of its action may, to the maximum extent possible, further the expressed intent of
15 this ordinance and the accomplishment of the following objectives in particular:
16 1.1 Accessibility for emergency response. That all proposed structures, equipment or
17 material shall be readily accessible for fire, ambulance, police, and other emergency
18 response;
19 1.2 Harmony of location, size and character. That the proposed use shall be of such
20 location, size and character that, in general, it will be in harmony with the appropriate and
21 orderly development of the zone in which it is proposed to be situated and will not be
22 detrimental to the orderly development of adjacent properties in accordance with the
23 zoning classification of such properties;
24 1.3 Residential zones. That, in addition to the above, in the case of any use located in, or
25 adjacent to, a residential zone:
26 1.31 The location and size of such use, the nature and intensity of operations involved
27 in or conducted in connection therewith, its site layout and its relation to access
28 streets shall be such that both pedestrian and vehicular traffic to and from the use and
29 the assembly of persons in connection therewith will not be hazardous or
30 inconvenient to, or incongruous with, the said residential district or conflict with the
31 normal traffic of the neighborhood; and
Draft Amendments to Article 10 June 14, 2011 Page 1 of 33
Paj 27
32 1.32 The location and height of buildings, the location, nature and height of walls and
33 fences, the nature and extent of landscaping, and other improvements on the site shall
34 be such that the use will not hinder or discourage the appropriate development and
35 use of adjacent land and buildings.
36 1.4 Conditional use permits.
37 1.41 Conditional use approval. Any use for which a conditional use permit may be
38 granted shall be deemed to be a conforming use in the district in which such use is
39 located, provided that:
40 (A) The provision in this ordinance under which such permit was issued is still in
41 effect;
42 (B) Such permit was issued in conformity with the provisions of this ordinance;
43 and
44 (C) Such permit shall be deemed to affect only the lot or portion thereof for which
45 such permit shall have been granted.
46 1.42 Periodic renewal of conditional use permit. The commission may require that
47 conditional use permits be periodically renewed. Such renewal shall be granted
48 following public notice and hearing in accordance with subsection 1.53. The
49 commission may withhold approval of the renewal upon a determination by the city
50 planner to the effect that such conditions as may have been prescribed by the
51 commission in conjunction with the issuance of the original permit have not been, or
52 are being no longer, complied with.
53 1.43 Revocation of conditional use permit. If the city planner determines that the
54 conditions prescribed by the commission in conjunction with the issuance of the
55 conditional use permit have not been, or are no longer complied with, he shall initiate
56 the process for revocation of the permit according to the following procedure:
57 (A) The city planner shall notify the permit-holder in writing of the
58 noncompliance with the permit conditions and allow the permit-holder 30
59 days to comply with the permit conditions.
60 (B) If, after 30 days, the city planner determines that the permit-holder has not
61 come into compliance with permit conditions, he shall notify the permit-
62 holder that the planning commission will hold a public hearing on revocation
63 of the conditional use permit.
64 (C) The planning commission shall hold a public hearing for which notice shall be
65 completed by the planning office in accordance with the provisions of
66 subsection 1.53 of this article.
67 (D) Following the public hearing, the planning commission shall take action in the
68 following regard:
69 (1) Revoke the conditional use permit.
Draft Amendments to Article 10 June 14, 2011 Page 2 of 33
Paj 28
70 (2) Issue a probationary period after which the commission shall review
71 the permit in accordance with the provisions regarding periodic
72 renewal of conditional use permit.
73 (3) Determine that the conditional use may continue as initially
74 authorized.
75 (E) The planning commission shall document findings of fact that support the
76 action taken with regards to the conditional use permit.
77 1.5 Application procedure.
78 1.51 Preapplication Meeting. Prior to the submission of a conditional use application,
79 the applicant or his representative shall meet in person with the city planner or his
80 designee with a sketch plan. The purpose of this meeting shall be to discuss proposed
81 uses or developments and to review the process and submission requirements.
82 1.52 Application. Application for a conditional use permit shall be submitted to the
83 city planner, on forms approved by the planning commission, at least 30 days prior to
84 the planning commission meeting at which approval of the permit is to be requested.
85 Each application for a conditional use permit shall be accompanied by a fee as
86 provided for in Appendix F--Fees and Fines.
87 1.53 Public hearing. Prior to the review and action on the conditional use permit
88 application, the commission shall hold a public hearing subject to the following
89 public notification procedures:
90 (A) The applicant shall advertise the public hearing in a newspaper of general
91 circulation at least 15 days prior thereto.
92 (B) The applicant shall notify by mail all property owners within 200 feet of the
93 extreme limits of the subject property as their names appear on the municipal
94 tax record at least 15 days prior thereto.
95 (C) The applicant shall post a notice outlining the date, time, place, and nature of
96 the hearing in a conspicuous location on the property at least 15 days prior to
97 the planning commission hearing. Such notice shall be designed in accordance
98 with standards set forth by the planning commission.
99 (D) The applicant shall provide the planning office with a copy of the notice,
100 verification of newspaper publication, a date-stamped photo of the property
101 posting, and post office mail receipts indicating the date of mailing for all
102 letters on or before the meeting date.
103 (E) Said notices shall state the date, time and place of the hearing, the site
104 location, a brief description of the conditional use and shall state that a copy
105 of the conditional use application and plan is filed with the planning office for
106 public review.
Draft Amendments to Article 10 June 14, 2011 Page 3 of 33
Paj 29
107 1.54 City planner report. For each application for a conditional use permit, the city
108 planner shall issue a report to the planning commission including comments from
109 other agencies and detailing how the application conforms to the requirements of the
110 zoning ordinance and other provisions of city and state codes. This report shall not be
111 deemed to represent a comprehensive list of all city and state code requirements.
112 (A) The city planner shall transmit copies of the report and summary of the
113 application to the planning commission at least seven days prior to the date of
114 the meeting at which approval of the permit is to be requested.
115 1.55 Planning commission action. The planning commission shall act to approve or
116 disapprove any such request for a conditional use permit within 45 days after the
117 meeting at which approval is requested or within such additional time as may be
118 consented to by the applicant. Planning commission disapproval shall include written
119 findings upon any element found contrary to the provisions or intent of the zoning
120 ordinance.
121 1.56 Notice of decision. The planning office shall send the applicant a letter notifying
122 the applicant of the planning commission’s decision on the conditional use permit
123 application. Such letter shall document any conditions and waivers approved as part
124 of the application approval. Whenever the planning commission denies an
125 application for conditional use, such application for conditional use, or an application
126 on the same property which is substantially similar, shall not be accepted for
127 consideration by the planning commission sooner than one year from the date of
128 denial.
129 1.57 Amendments. Substantial amendments to conditional use permits shall be acted
130 upon in the same manner as the original request for a conditional use permit. The city
131 planner shall review proposed amendments to determine if they are substantial in
132 nature. Amendments that are not deemed substantial may be referred to the planning
133 commission for consideration at the discretion of the city planner.
134 1.58 Transfer of property. If the property is sold by the applicant or by any affiliated
135 member of a single corporate family of which the applicant or its parent company is a
136 member, after approval of the conditional use but before the proposed use or
137 construction of the proposed use is started, or if, within 24 months of the approval,
138 the proposed use or construction of the proposed use is not undertaken by or for the
139 applicant or any affiliated member of a single corporate family of which the applicant
140 or its parent company is a member, the conditional use approval shall be null and
141 void, unless an extension of time is granted by the planning commission.
142 1.59 Final plans and working drawings. Following approval by the planning
143 commission, the applicant shall develop final conditional use permit plans for
144 approval by the planning office. The planning office shall determine that all
Draft Amendments to Article 10 June 14, 2011 Page 4 of 33
Paj 30
145 necessary approvals have been issued by city departments, and outside regulatory
146 agencies, prior to issuing final plan approval. No building permit shall be issued until
147 such time that the planning office has issued final conditional use permit plan
148 approval.
149 1.6 Expiration of planning commission approval.
150 1.61 Conditional use approval shall expire on the last day of the 24th month after the
151 date of final or conditional approval of the planning commission, if construction of
152 the work authorized or use permitted has not started or unless an extension of time is
153 applied for by the applicant and granted by the planning commission. Approval shall
154 also expire if the construction of work authorized has stopped for a period of one
155 year, unless an extension of time is applied for and granted by the planning
156 commission.
157 1.62 Requests for extension of approval shall be made no later than 30 days prior to
158 the final approval expiration date. Upon receipt of such requests, the matter shall be
159 considered at the next regularly scheduled meeting of the planning commission.
160
161 1.63 In considering a request for an extension of approval, the planning commission
162 shall consider, but not be limited to, the following:
163 (A) Whether the project has been delayed for reasons beyond the control of the
164 applicant, excluding economic or financial reasons.
165 (B) Whether the applicant has made substantial progress toward obtaining final
166 approvals.
167 (C) Whether there have been any significant changes in the surrounding
168 neighborhood.
169 (D) Whether there has been any related amendments to the zoning map or text, or
170 the comprehensive plan, or if any waivers or variances have been granted.
171
172 1.64 Requests for extensions shall be submitted in writing to the planning office.
173
174 1.65 Under no circumstances shall the planning commission grant extensions beyond
175 36 months from the date of first approval.
176 1.7 Submission requirements for conditional use permits requiring site development plan
177 approval by the planning commission. The following submission requirements shall
178 accompany applications for conditional use permits where site development plan
179 approval by the planning commission is required by subsection 2.1. The applicant shall
180 cause a site map to be prepared by a civil engineer, surveyor, land planner, or architect.
181 The applicant shall submit copies of the site map to the city planner, who shall transmit
182 copies to the planning commission at least seven days prior to the meeting at which
Draft Amendments to Article 10 June 14, 2011 Page 5 of 33
Paj 31
183 approval of the permit is to be requested. Elements to be included on the site map are
184 listed below:
185 1.71 Scale and dimensions. The map shall be at least 11 inches by 17 inches and at a
186 scale of ten, 20, 30 or 40 feet to the inch, except that if the property has a maximum
187 dimension over 900 feet, a scale of 50 feet to the inch may be used.
188 1.72 Legal data:
189 (A) Tax parcel identification number.
190 (B) Name and address of the owner of record.
191 (C) Name and address of the equitable owner, if any.
192 (D) Name and address of the person, firm or organization preparing the map.
193 (E) Date, north point and written and graphic scale.
194 (F) Sufficient description of information to define precisely the boundaries of the
195 property and that portion of the property for which a conditional use permit is
196 requested, and the approximate total acreage of that portion of the property for
197 which a conditional use permit is requested. All distances shall be given in
198 feet and tenths of a foot. All angles shall be given to the nearest ten seconds or
199 closer. The error of closure shall not exceed one in 10,000.
200 (G) The locations, names and existing widths of adjacent street rights-of-way and
201 curblines.
202 (H) The locations and owners of record of all adjoining lands.
203 (I) Location, width and purpose of all existing and proposed easements, setbacks,
204 reservations and areas dedicated to public use within or adjoining the
205 property.
206 (J) A complete outline of existing or proposed deed restrictions or covenants
207 applying to the property and recital of the deed references if they are of
208 record.
209 (K) Existing zoning, including two location maps, one at a scale of 1,200 feet to
210 the inch, and one at a scale of 400 feet to the inch, showing the distance along
211 all adjacent roads to the nearest intersection.
212 1.73 Existing structures.
213 (A) Location of uses and outlines of structures, drawn to scale on or within 100
214 feet of the property.
215 (B) Paved areas, sidewalks and vehicular access between the site and public
216 streets.
217 (C) Other existing development, including fences and landscape screening.
218 1.74 Proposed use:
219 (A) A written description of the proposed use.
Draft Amendments to Article 10 June 14, 2011 Page 6 of 33
Paj 32
220 (B) A designation of that portion of the existing structures to be devoted to the
221 proposed use and for which a conditional use permit has been requested.
222 (C) A designation of that portion of the property to be devoted to the proposed
223 use, not requiring structures and for which a conditional use permit has been
224 requested.
225 (D) A designation of the parking area and indication of the number of off-street
226 parking spaces.
227 (E) Indication of on-site circulation pattern and access to the property from
228 adjacent roads.
229 1.75 Proposed development:
230 (A) Conditional use applications involving construction of new buildings and
231 structures shall include a site plan which reflects compliance with the
232 minimum requirements of subsection 2.5.
233 1.76 Natural features:
234 (A) Topography of the site.
235 (B) Location of different soil types, as indicated by the Soil Survey of Kent
236 County prepared by the Natural Resources Conservation Service. The soils
237 information shall be supplemented by soil boring and percolation test data if
238 requested by the city.
239 (C) Location of flood hazard areas as identified on the FEMA flood insurance
240 maps.
241 (D) Location of significant natural features, including, bodies of water, wetlands
242 and forest areas.
243 1.77 Requested information: Full and complete information requested by the city
244 planner in accordance with the development information requirements set forth in
245 section 4.
246 1.78 Miscellaneous information: Other information deemed by the planning
247 commission to be necessary to determine conformity with the intent of this ordinance.
248 1.8 Submission requirements for conditional use permits where site development plan
249 approval by the planning commission is not required. The following submission
250 requirements shall accompany applications for conditional use permits where site
251 development plan approval by the planning commission is not required by subsection 2.1,
252 where the applicant is seeking conditional use approval to occupy an existing
253 structure. The applicant shall submit copies of the site map conforming to the
254 specifications listed below to the city planner, who shall transmit copies to the planning
255 commission at least seven days prior to the meeting at which approval of the permit is to
256 be requested. Elements to be included on the site map are listed below:
257
Draft Amendments to Article 10 June 14, 2011 Page 7 of 33
Paj 33
258 1.81 Scale and Dimensions. The map shall be at least 8.5 inches by 11 inches and at a
259 scale of ten, 20, 30 or 40 feet to the inch, except that, if the property has a maximum
260 dimension over 900 feet, a scale of 50 feet to the inch may be used.
261 1.82 Existing Conditions. The existing building and conditions on the lot must be
262 depicted. It is permissible to utilize the most recent mortgage survey of the property
263 for this purpose. If conditions, such as buildings and building additions, paved areas,
264 landscaping and accessory structures, on the lot have changed since the survey was
265 completed, the applicant shall depict these changes on the plan to the best of his
266 ability. However, the nature and extent of such revisions must be approved by the city
267 planner at the required preapplication meeting.
268 1.83 Proposed use:
269 (A) A written description of the proposed use.
270 (B) A designation of that portion of the existing structures to be devoted to the
271 proposed use and for which a conditional use permit has been requested.
272 (C) A designation of that portion of the property to be devoted to the proposed
273 use, not requiring structures and for which a conditional use permit has been
274 requested.
275 (D) A designation of the parking area and indication of the number of off-street
276 parking spaces.
277 (E) Indication of on-site circulation pattern and access to the property from
278 adjacent roads.
279 1.84 Additional Information. The city planner and/or planning commission may
280 request more detailed information, including but not limited to architectural floor
281 plans, on a case-by-case basis at their discretion.
282 1.85 Legal data:
283 (A) Tax parcel identification number.
284 (B) Name and address of the owner of record.
285 (C) Name and address of the equitable owner, if any.
286 (D) Name and address of the person, firm, or organization preparing the map.
287 (E) Date, north point, and written and graphical scale.
288 (F) The location and names of adjacent streets.
289 (G) The location, zoning, and owners of record of all adjacent properties.
290 Section 2. Site development plan approval.
291 2.1 Required. Site development plan approval shall be required for the erection or
292 enlargement of all structures and the establishment of any use for which site development
293 plan approval is required by this ordinance. Site development plan shall be required
294 according to the following criteria:
Draft Amendments to Article 10 June 14, 2011 Page 8 of 33
Paj 34
295 2.11 Planning commission site plan review. Site development plans shall be referred
296 to the planning commission for consideration and review include any of the
297 following:
298 (A) Site plans for new structures and building additions of 3,000 square feet or
299 greater in floor area; or
300 (B) Site plans with a total of 5,000 square feet or greater of new or added
301 impervious surface, including new structures or building additions; or
302 (C) Nonresidential site plans with site disturbance greater than 1,500 square feet
303 and adjacent to residential uses or residential zones.
304 2.12 Site development master plan. Site development master plans shall be subject to
305 review and approval by the planning commission in accordance with subsection 2.44.
306 2.13 Zoning review. For site development plans involving construction of a single
307 family detached, single family attached, or single family semi-detached dwelling; an
308 accessory structure; or a non-residential change of use for which no building addition
309 or increase in impervious cover is proposed, the city planner or his designee may
310 approve the site development plan in conjunction with building permit review.
311 2.14 Administrative site plan. All site development plans that do not meet the
312 thresholds for zoning review in accordance with subsection 2.13 or planning
313 commission site plan review in accordance with subsection 2.11 shall be reviewed as
314 administrative site development plans.
315 2.2 Objectives. In considering and acting upon site development plans, the public health,
316 safety and welfare, the comfort and convenience of the public in general and of the
317 residents of the immediate neighborhood in particular shall be taken into consideration
318 and appropriate conditions and safeguards may be prescribed as may be required that the
319 results of approval may, to the maximum extent possible, further the expressed intent of
320 this ordinance and the accomplishment of the following objectives in particular:
321 2.21 Maximum safety and convenience of vehicular, transit, bicycle, and pedestrian
322 traffic by ensuring that all proposed and impacted streets, driveways and walkways
323 are adequate, but not excessive in number, adequate in width, grade, alignment,
324 capacity, and visibility, and suitably located, particularly with respect to their
325 connections with public streets.
326 2.22 The provision of adequate access to all proposed structures, equipment, or
327 material on the site for fire, ambulance, police, and other emergency services.
328 2.23 The provision of adequate off-street parking to accommodate the vehicles of
329 persons connected with or visiting the use and to obviate the parking of such vehicles
330 in public streets.
Draft Amendments to Article 10 June 14, 2011 Page 9 of 33
Paj 35
331 2.24 A site layout (including the location, power, direction, and time of any outdoor
332 lighting of the site) which would have no adverse effect upon adjacent properties.
333 2.25 Landscaping of the site in a manner which is in character with that generally
334 prevailing in the neighborhood and which provides reasonable screening, at all
335 seasons of the year, of all playgrounds, parking areas, and service areas from the view
336 of adjacent residential properties and streets.
337 2.26 In applicable cases, a drainage system and layout which would afford the best
338 solution to any drainage problems.
339 2.27 Ensure that large scale development projects involving extended construction
340 periods are planned and implemented in accordance with an approved site
341 development master plan.
342 2.28 Consideration shall be given to the physical orientation and architectural
343 characteristics of proposed buildings, the relationship of proposed buildings to
344 existing buildings and to other proposed buildings, and their contributions to the
345 overall image of the immediate vicinity by considering the building and architectural
346 design guidelines as set forth in article 5, section 19. Design characteristics of
347 proposed buildings and building additions shall not detract or devalue existing
348 buildings in the immediate vicinity.
349 (A) If the planning commission determines that the proposed physical orientation
350 and architectural characteristics of the proposed buildings do not meet the
351 intent and objectives of this section, then the planning commission shall refer
352 the proposal to the architectural review oversight subcommittee for review
353 and comment.
354 (B) The subcommittee shall meet and review the proposal with the applicant, and
355 return its comments to the planning commission by the next regularly
356 scheduled meeting.
357 (C) The architectural review oversight subcommittee shall be appointed by the
358 commission at its annual meeting, and membership shall consist of two
359 planning commission members, and two design professionals with experience
360 in construction, and the mayor or the mayor's designee. Two alternate design
361 professionals with experience in construction shall also be appointed.
362 2.3 Effect of site development plan approval. No building permit will be issued for any
363 structure covered by this section until an approved site development plan or approved
364 amendment of any such plan has been secured by the applicant. No certificate of
365 occupancy will be issued for any structure or use of land covered by this section unless
366 the structure is completed or the land is developed or used in accordance with an
367 approved site development plan or approved amendment of any such plan.
368 2.4 Application Procedure.
Draft Amendments to Article 10 June 14, 2011 Page 10 of 33
Paj 36
369 2.41 Preapplication Meeting. Prior to the submission of a site development plan, the
370 applicant or his representative shall meet in person with the city planner or his
371 designee with a sketch plan. The purpose of this meeting shall be to discuss proposed
372 uses or developments in order to determine, first, whether the site development plan
373 application shall be submitted to the city planner for consideration and review as an
374 administrative site plan or shall be referred to the planning commission.
375 If the application is to be referred to the planning commission, the applicant shall be
376 informed at the preapplication meeting which elements listed in subsection 2.5 below
377 will be required in determination of conformity with the provisions and intent of this
378 section, along with any other comments and suggestions intended to bring about
379 conformity with the provisions and intent of this section.
380 2.42 Administrative site plan review.
381 (A) Process for administrative site plan application. If, as a result of the
382 preapplication meeting as described in subsection 2.41, it is determined that
383 the proposed uses or development is of a type that may be approved by the
384 city planner, the applicant shall submit the application for site development
385 plan approval on forms approved for that purpose, to the city planner with the
386 required documentation under the provisions of subsection 2.5, and a fee as
387 provided for in Appendix F: Fees and Fines. The city planner shall coordinate
388 the reviews of the various administrative departments of the City of Dover and
389 outside regulatory agencies and approve the application within thirty (30) days
390 of the date of submission or refer it to the planning commission at their next
391 scheduled meeting.
392 (B) Final plans and working drawings. Following initial review and comment by
393 the city planner, the applicant shall develop final construction plans for
394 approval by the planning office. The planning office shall determine that all
395 necessary approvals have been issued by city departments and outside
396 regulatory agencies prior to issuing final plan approval. No building permit
397 shall be issued until such time that the planning office has issued final site
398 plan approval.
399 (C) Expiration. Administrative site development plan approval shall expire on the
400 last day of the 24th month after the date of final approval by the planning
401 office if construction of the work authorized or use permitted has not started
402 or unless an extension of time is applied for by the applicant and granted by
403 the city planner. Approval shall also expire if the construction of work
404 authorized has stopped for a period of one year unless an extension of time is
405 applied for and granted by the city planner.
406 (D) Circumventing zoning requirements. Administrative site plans shall not be
407 used to circumvent the requirement of planning commission site plan review.
Draft Amendments to Article 10 June 14, 2011 Page 11 of 33
Paj 37
408 If the city planner determines that cumulative administrative site plans on a
409 property are being used to circumvent the requirements of the zoning
410 ordinance or other provisions of the Dover Code of Ordinances, he shall refer
411 the application to the planning commission, subject to the requirements of
412 subsection 2.43.
413 2.43 Planning commission site plan review.
414 (A) Site development plan. If, as a result of the preapplication meeting as
415 described in subsection 2.41, it is determined that the proposed uses or
416 development is of a type that would be reviewed by the planning commission
417 and approval or disapproval of the application given by that body, the
418 application for site development plan approval shall be submitted to the city
419 planner on forms approved by the planning commission, at least 30 days prior
420 to the planning commission meeting at which approval is to be requested. The
421 application for site development plan approval shall be accompanied by a fee
422 as provided for in Appendix F--Fees and Fines.
423 (B) Land subdivision. If a proposed use or development requires planning
424 commission review under the land subdivision regulations of the City of
425 Dover as set forth in appendix A, the application for conditional approval of
426 the preliminary layout, under article IV, section B of that ordinance appendix
427 A, and the application for site development plan approval under this ordinance
428 shall be submitted and reviewed concurrently. The application for site
429 development plan approval shall be revised and all changed elements
430 resubmitted and reviewed concurrently with the application for plan approval
431 under article IV, section C of the land subdivision regulations set forth in
432 appendix A.
433 (C) Public hearing. Prior to the review and action on the site plan application, the
434 commission shall hold a public hearing subject to the following public
435 notification procedures:
436 (1) The applicant shall advertise the public hearing in a newspaper of
437 general circulation at least 15 days prior thereto.
438 (2) The applicant shall notify, by mail, all property owners within 200 feet
439 of the extreme limits of the site plan property as their names appear on
440 the municipal tax record at least 15 days prior thereto.
441 (3) The applicant shall post a notice outlining the date, time, place, and
442 nature of the hearing in a conspicuous location on the property. Such
443 notice shall be designed in accordance with standards set forth by the
444 planning commission.
445 (a) The applicant shall provide the planning office with a copy of
446 the notice, verification of newspaper publication, a date-
447 stamped photo of the property posting, and post office mail
Draft Amendments to Article 10 June 14, 2011 Page 12 of 33
Paj 38
448 receipts including the date of mailing for all letters on or before
449 the meeting date.
450 (4) Said notices shall state the date, time and place of the hearing, the site
451 location, a brief description of the site plan and shall state that a copy
452 of the site plan application and plan is filed with the planning office
453 for public review.
454 (D) City planner report. For each site plan application to the planning commission
455 the city planner shall issue a report to the planning commission including
456 comments from other agencies detailing how the application conforms to the
457 requirements of the zoning ordinance and other provision of city and state
458 codes. This report shall not be deemed to represent a comprehensive list of all
459 city and state code requirements. The city planner shall transmit copies of the
460 proposed site development plan and the city planner’s report to the planning
461 commission at least seven days prior to the date of the meeting at which
462 approval of the site development plan is to be requested.
463 (E) Planning commission action. The planning commission shall act to approve or
464 disapprove any application for site development plan received by it either as
465 an original review or as a referral from the city planner under the provisions of
466 subsection 2.42(A) of this article within 45 days or within such additional
467 time as may be consented to by the applicant. Planning commission
468 disapproval shall include written findings upon any site development plan
469 element found contrary to the provisions or intent of the zoning ordinance.
470 (F) Notice of decision. The planning office shall send the applicant a letter
471 notifying the applicant of the planning commission’s action regarding the site
472 plan application. Such letter shall document any conditions and waivers
473 approved or recommended as part of the application approval.
474 (G) Final plans and working drawings. Following approval by the planning
475 commission, the applicant shall develop final site plans for approval by the
476 planning office. The planning office shall determine that all necessary
477 approvals have been issued by city departments and outside agencies
478 regulating street access and stormwater management, prior to issuing final
479 plan approval. No building permit shall be issued until such time that the
480 planning office has issued final site plan approval
481 (H) Amendments. Substantial amendments to an approved site development plan
482 shall be acted upon in the same manner as the original plan. The city planner
483 shall review proposed amendments to determine if they are substantial in
484 nature. Amendments that are not deemed substantial may be referred to the
485 planning commission for consideration at the discretion of the city planner.
486 (I) Expiration of planning commission approval.
Draft Amendments to Article 10 June 14, 2011 Page 13 of 33
Paj 39
487 (1) Site development plan approval shall expire on the last day of the 24th
488 month after the date of final or conditional approval of the planning
489 commission if construction of the work authorized or use permitted has
490 not started or unless an extension of time is applied for by the applicant
491 and granted by the planning commission. Approval shall also expire if the
492 construction of work authorized has stopped for a period of one year
493 unless an extension of time is applied for and granted by the planning
494 commission.
495 (2) Request for extension of approval shall be made no later than 30 days
496 prior to the final approval expiration date. Upon receipt of such request,
497 the matter shall be considered at the next regularly scheduled meeting of
498 the planning commission.
499 (3) In considering a request for an extension of approval, the planning
500 commission shall consider, but not be limited to, the following:
501 (a) Whether the project has been delayed for reasons beyond the
502 control of the applicant, excluding economic or financial reasons.
503 (b) Whether the applicant has made substantial progress toward
504 obtaining final approvals.
505 (c) Whether there have been any significant changes in the
506 surrounding neighborhood.
507 (d) Whether there has been any related amendments to the zoning map
508 or text, or the comprehensive plan, or if any waivers or variances
509 have been granted.
510 (4) Requests for extensions shall be submitted in writing to the planning
511 office.
512 (5) Under no circumstances shall the planning commission grant extensions
513 beyond 36 months from the date of first approval.
514 2.44 Site development master plans. Conceptual site development master plans shall
515 be reviewed by the planning commission in accordance with the provisions of
516 subsection 2.43. Conceptual site development master plans shall depict a site
517 development proposal that reflects general compliance with the provisions of the
518 zoning ordinance and shall also reflect the following information on the plan:
519 (A) Conceptual Master Plan. Conceptual Master Plan shall include the proposed
520 general layout of building, streets, parking, open space, landscape concepts,
521 and stormwater management areas.
522 (1) Detailed site construction plans, details, and specifications are not required
523 as part of a site development master plan submission.
524 (2) The plan shall illustrate distinct phase boundaries for each proposed
525 construction phase and shall depict proposed construction and site
526 improvements planned for each phase. Bulk quantities and area totals for
Draft Amendments to Article 10 June 14, 2011 Page 14 of 33
Paj 40
527 each construction phase, and for the total site, shall be tabulated in a data
528 column on the plan.
529 (3) Each construction phase shall be enumerated in sequential order on the
530 site development master plan according to the order of construction
531 contemplated by the plan. Phases shall be implemented in accordance with
532 the approved site development master plan unless the city planner
533 approves an alternate phasing.
534 (4) Each construction phase represented on the master plan shall be planned
535 and designed to function independent of construction and site
536 improvements contemplated in future construction phases in all respects,
537 including but not limited to bulk area provisions of the zoning district in
538 which the site is located, off-street parking requirements, site entrances,
539 emergency access requirements, site utilities, and stormwater management
540 improvements except where the requirements and needs of a later phase
541 are met and remain met by a previous phase of completed construction.
542 (5) Any special agreements or conditions of approval relative to the overall
543 development that have been specified by regulatory agencies shall be
544 documented on the site development master plan.
545 (B) Phased site plan approval. Individual phased components of the Conceptual
546 Master Plan are to be reviewed and approved as an Administrative Site
547 Plan. Final site construction plans, including detailed site grading, paving,
548 utilities, stormwater management, and tree planting and preservation plans
549 shall be submitted for final approval by the city planner and/or authorized
550 designee, and to other agencies having jurisdiction, on a phase by phase basis
551 in accordance with the approved site development master plan, and all
552 regulations of the City of Dover governing the approval of site plans as set
553 forth in subsection 2.4 and 2.5.
554 (C) Amendments. Substantial amendments to an approved site development
555 master plans shall be acted upon in the same manner as the original plan. The
556 city planner shall review proposed amendments to determine if they are
557 substantial in nature. Amendments that are not deemed substantial may be
558 referred to the planning commission for consideration at the discretion of the
559 city planner.
560 (D) Expiration of planning commission approval. For projects which are reviewed
561 and approved by the planning commission as conceptual master plans,
562 approval of the conceptual master plan shall remain valid for a period not to
563 exceed five years from the date of planning commission approval, provided
564 that the authorized construction or use has commenced within two years of
565 approval and is proceeding toward completion. In addition, the time between
Draft Amendments to Article 10 June 14, 2011 Page 15 of 33
Paj 41
566 the completion of one phase and the initiation of the next phase shall not
567 exceed a period of two years.
568 2.5 Site development plan elements submission requirements accompanying applications
569 for site development plan approval. The applicant shall cause a site development plan
570 map to be prepared by a civil engineer, surveyor, land planner, or architect. The applicant
571 shall submit copies of the site development plan to the city planner at the time of filing
572 the formal application for site development plan approval under the provisions of
573 subsection 2.42, subsection 2.43, or subsection 2.44. If the application is under the
574 provisions of subsection 2.43 or 2.44, the city planner shall transmit copies of the site
575 development plan map to the planning commission at least seven days prior to the
576 meeting at which approval of the application for site development plan approval is to be
577 requested. Site development plan elements shall include those listed below which are
578 appropriate to the proposed development or use as indicated in the preapplication meeting
579 required by the provisions of subsection 2.41.
580 2.51 Scale dimensions: Ten, 20, 30 or 40 feet to the inch, except that if the property
581 has a maximum dimension over 900 feet, a scale of 50 feet to the inch may be used.
582 2.52 Legal data:
583 (A) Tax parcel identification number.
584 (B) Name and address of the owner of record.
585 (C) Name and address of the equitable owner, if any.
586 (D) Name and address of the person, firm or organization preparing the map.
587 (E) Date, north point and written and graphic scale.
588 (F) Sufficient description of information to define precisely the boundaries of the
589 site, and total acreage of the site. All distances shall be given in feet and tenths
590 of a foot. All angles shall be given to the nearest ten seconds or closer. The
591 error of closure shall not exceed one in 10,000.
592 (G) The locations, names and existing widths of adjacent street rights-of-way and
593 curblines.
594 (H) The locations and owners of record of all adjoining lands.
595 (I) Locations, widths and purposes of all existing and proposed easements,
596 setbacks, reservations and areas dedicated to public use within or adjoining
597 the property.
598 (J) A complete outline of existing or proposed deed restrictions or covenants
599 applying to the property and recital of the deed references if they are of
600 record.
601 (K) Existing zoning on the site and adjacent properties.
Draft Amendments to Article 10 June 14, 2011 Page 16 of 33
Paj 42
602 (L) Two location maps, one at a scale of 1,200 feet to the inch, and one at a scale
603 of 400 feet to the inch, showing the distance along all adjacent roads to the
604 nearest intersections.
605 (M) Record of any agreements between the applicant and the city regarding the
606 proposed development.
607 2.53 Natural features:
608 (A) Contour lines at vertical intervals of two feet for land with an average existing
609 slope of four percent or less, and at intervals of five feet for land with an
610 average existing slope greater than four percent.
611 (B) Location of different soil types, as indicated by the soil survey of Kent
612 County, prepared by the Natural Resources Conservation Service, and
613 including locations of flood hazard areas as identified in the FEMA Flood
614 Insurance Maps. The soils information shall be supplemented by soil boring
615 and percolation test data, if requested by the city.
616 (C) Location of significant natural features, including bodies of water, wetlands,
617 and forest areas.
618 2.54 Proposed development:
619 (A) Existing buildings and other structures.
620 (B) Location and width of all proposed streets and rights-of-way. Speed bumps or
621 speed dips for the purpose of slowing down traffic on any street shall not be
622 permitted.
623 (C) Location of all proposed structures, except one-family detached dwellings,
624 and an indication of the total number of dwelling units.
625 (D) Location and dimensions of all lot lines.
626 (E) Building setback lines on all lots.
627 (F) Location of all uses not requiring structures, including parks, playgrounds and
628 other open space areas.
629 (G) Location and plans for any outdoor signs.
630 (H) Location, direction, power and time of use for any proposed outdoor lighting.
631 (I) The location, size and arrangement of proposed sidewalks, driveways, loading
632 areas, off-street parking areas and other paved areas.
633 (J) Indication of the total amount of impervious surfaces and the development
634 coverage.
635 (K) Any proposed changes in elevation of the site and elevations of all streets,
636 parking areas, and building foundations. The datum to which all elevations,
637 including existing contour elevations, refer shall be clearly indicated on the
638 plan.
Draft Amendments to Article 10 June 14, 2011 Page 17 of 33
Paj 43
639 (L) Plans for surface drainage of the site. Such plans shall include stormwater run-
640 off calculations and shall show the proposed method of accommodating the
641 anticipated run-off.
642 (M) Any proposed below-ground or above-ground utilities and any contemplated
643 public improvements, including road improvements, on or adjoining the
644 property. Plans for such utilities and improvements shall indicate whether the
645 developer, the city, or other agency will bear the financial responsibility for
646 the construction, and which improvements are intended to be dedicated to the
647 city.
648 (N) Proposed grading, screening and other landscaping, including types and
649 locations of proposed street trees.
650 (O) Architectural elevation drawings or other graphic representations illustrating
651 exterior building characteristics of proposed buildings and/or building
652 additions that would be visible from the public right-of-way. Elevation
653 drawings shall be drawn to scale and shall reflect major architectural elements
654 such as exterior surface materials, windows, doors, columns, and wall-
655 mounted signage. Elevation plans are intended to provide a general depiction
656 of the physical appearance, massing and scale of the proposed construction.
657 2.55 Requested information. Full and complete information requested by the city
658 planner in accordance with the development information requirements set forth in
659 section 4.
660 2.56 Development in stages. If the site development plan indicates more than one
661 stage of the development, supplementary material shall be included to show
662 compliance with article 5, section 9, development in stages.
663 2.57 Miscellaneous information. Other information deemed by the planning
664 commission to be necessary to determine conformity with the intent of this ordinance.
665 Section 3. Historic district commission and architectural review.
666 3.1 Historic district commission established.
667 3.11 Creation and purpose. There shall be a historic district commission for the
668 purpose of assisting the planning commission and city planner in reviewing
669 applications for architectural review certifications as specified in subsection 3.2; and
670 for making recommendations for designation of historic district zones; and for
671 establishing guidelines for the preservation and conservation of historic district zones;
672 and for advising other officials and departments in the City of Dover in matters
673 concerning historic preservation; and for reviewing all proposed National Register
674 nominations in the City of Dover; and for acting as a liaison on behalf of the City of
675 Dover to individuals and organizations concerned with historic preservation; and for
676 carrying out programs of historic preservation education in the City of Dover.
Draft Amendments to Article 10 June 14, 2011 Page 18 of 33
Paj 44
677 3.12 Appointment. The commission shall consist of five members nominated by the
678 mayor and approved by the city council, who are residents of the City of Dover and
679 who have demonstrated special interest, experience, or knowledge in history,
680 architecture, or historic preservation. Two of the members, to the extent available,
681 shall be professional members representing the professions of architecture, history,
682 archaeology, planning, historic preservation or related disciplines. At least two
683 members shall be residents of the district, and at least one shall represent the business
684 within the district.
685 3.13 Term. The members of the commission shall serve for three-year staggered
686 terms. Vacancies shall be filled within 60 days in accordance with subsection 3.12 of
687 this section.
688 3.14 Organization. The commission shall meet at least four times per year in a place
689 that is advertised in advance and open to the public and shall keep minutes of its
690 meetings that are available to the public. All review decisions shall be made in public.
691 The commission shall establish bylaws for its general procedure, which shall include
692 a section addressing conflicts of interest. The commission shall produce an annual
693 report of its activity that is kept on file for public review with the city planning office.
694 3.2 Architectural review certification.
695 3.21 Effect of architectural review certificate. No building permit or certificate of
696 occupancy may be issued for any structure in the historic district until an architectural
697 review certificate is issued as required under article 3, section 21, subsection 21.3 for
698 the historic district.
699 3.22 Architectural review certification by the city planner.
700 (A) An architectural review certificate for specific classes of building permits,
701 including fences, signs, siding, window and door replacement, roofing, the
702 addition or replacement of decorative features, minor demolition, residential
703 additions, and other construction of a minor nature, may be issued by the city
704 planner, after a review and determination that the proposed construction is in
705 general accordance with the standards set forth in subsection 3.25.
706 (B) The city planner may refer any permit application for demolition or
707 construction in the historic district for consultation with commission.
708 (C) All decisions of the city planner pursuant to this subsection shall be
709 documented on the building permit. When the city planner grants a
710 conditional approval under this section, all conditions of approval shall be set
711 forth in writing on the building permit. In the event of a denial, the reasons for
712 such denial shall be documented in a written notice of decision which shall
713 identify all elements of the application found to be contrary to the provisions
714 or intent of this section.
Draft Amendments to Article 10 June 14, 2011 Page 19 of 33
Paj 45
715 (D) An applicant may appeal the decision of the city planner to the historic district
716 commission and such appeal shall be considered as an architectural review
717 certification application to the historic district commission and shall meet all
718 of the requirements set forth in subsection 3.23.
719 3.23 Architectural review certification by the historic district commission
720 (A) The historic district commission shall issue architectural review certificates
721 for the construction or demolition of single-family and two-family homes, and
722 nonresidential structures or additions involving a gross floor area of 3,000
723 square feet or less, after review of the proposed construction and after a
724 determination that the construction is in general accordance with the standards
725 set forth in subsection 3.25 below.
726 (B) All applications to the historic district commission for architectural review
727 certification shall be subject to the procedures set forth in subsection 3.26.
728 (C) All decisions of the historic district commission pursuant to this subsection
729 shall be formalized in a written notice of decision. When the commission
730 grants a conditional approval under this subsection, all conditions of approval
731 shall be set forth in writing in the notice of decision. In the event of a denial,
732 the notice of decision shall state the reasons for denial and shall identify all
733 elements of the application found to be contrary to the provisions or intent of
734 this subsection.
735 (D) An applicant may appeal the decision of the historic district commission to the
736 planning commission, and such appeal shall be considered as an architectural
737 review certification application to the planning commission and shall meet all
738 of the requirements set forth in subsection 3.24 and subsection 3.26.
739 3.24 Architectural review certification by the planning commission.
740 (A) The planning commission shall issue architectural review certificates referred
741 or appealed to it, upon review of the recommendations of the historic district
742 commission and upon a determination that the proposed construction is in
743 accordance with the standards set forth in subsection 3.25.
744 (B) All applications to the planning commission for architectural review
745 certification shall be subject to the procedures set forth in subsection 3.26.
746 (C) All decisions of the planning commission pursuant to this subsection shall be
747 formalized in a written notice of decision. When the planning commission
748 grants a conditional approval under this subsection, all conditions of approval
749 shall be set forth in writing in the notice of decision. In the event of a denial,
750 the notice of decision shall state the reasons for denial and shall identify all
751 elements of the application found to be contrary to the provisions or intent of
752 this subsection.
753 3.25 Architectural review standards.
Draft Amendments to Article 10 June 14, 2011 Page 20 of 33
Paj 46
754 (A) An architectural review certificate may be issued if it is found that the
755 architectural style, general design, height, bulk and setbacks, arrangement,
756 location and materials and structures affecting the exterior appearance are
757 generally in harmony with neighboring structures and complementary to the
758 traditional architectural standards of the historic district as set forth in the
759 historic district design guidelines and standards adopted by the planning
760 commission and as set forth in the United States Secretary of the Interior's
761 Standards for Rehabilitation.
762 (B) The city planner, historic district commission or planning commission shall
763 not consider normal maintenance and repair (see definitions, article 12),
764 interior arrangement, or building features not subject to public view.
765 3.26 Procedures for an architectural review by the historic district commission and/or
766 planning commission.
767 (A) Architectural preapplication meeting. Prior to action on any application for an
768 architectural review certificate, the applicant shall meet in person with the city
769 planner or his delegated representative. The purpose of such conference shall
770 be to discuss the proposed construction or other action requiring the certificate
771 in order to determine what information is useful in the determination of
772 conformity with the provisions and intent of the historic district regulation as
773 expressed in this ordinance.
774 (B) Application and fee. The application to the historic district commission for an
775 architectural review certificate and related information shall be submitted to
776 the city planner at least 30 days prior to the historic district commission
777 meeting at which review is requested and shall be accompanied by a fee as
778 provided for in Appendix F--Fees and Fines.
779 (C) Public hearing. Prior to the review and action on an architectural review
780 certification, the historic district commission shall hold a public hearing
781 subject to the following public notification procedures:
782 (1) The applicant shall advertise the public hearing newspaper of general
783 circulation at least 15 days prior thereto.
784 (2) The applicant shall notify, by mail, all property owners within 200 feet of
785 the extreme limits of the subject property as their names appear on the
786 municipal tax record at least 15 days prior thereto.
787 (3) The applicant shall post a notice outlining the date, time, place, and nature
788 of the hearing in a conspicuous location on the property. Such notice shall
789 be designed in accordance with standards set forth by the planning
790 commission.
791 (4) The applicant shall provide the planning office with a copy of the notice,
792 verification of newspaper publication, a date-stamped photo of the
Draft Amendments to Article 10 June 14, 2011 Page 21 of 33
Paj 47
793 property posting, and post office mail receipts indicating date of mailing
794 for all letters on or before the meeting date.
795 (5) Said notices shall state the date, time, and place of the hearings before the
796 historic district commission, a brief description of the project and shall
797 state that a copy of the application and plan is on file with the planning
798 office for public review.
799 (6) If the planning commission is reviewing a project in accordance with other
800 sections of this article, then the public hearing notice on those applications
801 must also give notice of architectural review certification.
802 (D) Application information. The applicant shall provide such information and
803 documents listed below which will satisfactorily illustrate the proposed action
804 as indicated in the architectural preapplication meeting required in subsection
805 3.26(A):
806 (1) All plan elements required in subsection 2.5.
807 (2) Plans and specifications indicating existing and proposed development,
808 including structures, architectural elevation drawings, trees and any other
809 landscaping, existing and proposed, including the general design, location
810 and orientation of structures in relation to curb line, right-of-way line and
811 neighboring buildings, colors, and materials to be used on exterior
812 surfaces, detailed plans for any signs, photographs of the existing site and
813 neighboring buildings, and such other information as will enable the
814 historic district commission or planning commission to determine
815 conformity with the ordinance.
816 (E) City planner report. For each application to the planning commission the city
817 planner shall issue a report to the planning commission including comments
818 from other agencies detailing how the application conforms to the
819 requirements of the zoning ordinance and other provision of city and state
820 codes. This report shall not be deemed to represent a comprehensive list of all
821 city and state code requirements. The city planner shall transmit copies of the
822 proposed site development plan and the city planner’s report at least seven
823 days prior to the date of the meeting at which approval of the site development
824 plan is to be requested.
825 (F) Historic district commission action. The historic district commission shall act
826 to review and render a recommendation to approve any such application
827 within 45 days of transmittal to the commission or within such additional time
828 as may be consented to by the applicant. The recommendation of the historic
829 district commission shall be forwarded to the planning commission and acted
830 upon by the planning commission in conjunction with action on the associated
831 site development plan. If a site development plan application is not filed in
832 accordance with the provisions of subsection 2.4 of this article within one year
Draft Amendments to Article 10 June 14, 2011 Page 22 of 33
Paj 48
833 of recommendation, the recommendation shall expire. The historic district
834 commission may grant a one-year extension of its recommendation upon
835 written request by the applicant. Such request shall be made in writing to the
836 planning office at least thirty days prior to the expiration of the historic district
837 commission’s recommendation.
838 (G) Substantial Amendments. Substantial amendments to an application or an
839 architectural review certificate shall be acted upon in the same manner as the
840 original plan.
841 (H) Expiration of architectural review certification issued by the historic district
842 commission.
843 (1) Architectural review certification approval shall expire on the last day of
844 the 12th month after the date of approval if construction of the work
845 authorized or use permitted has not started or unless an extension of time
846 is applied for by the applicant and granted by the historic district
847 commission. Approval shall also expire if the construction of work
848 authorized has stopped for a period of one year unless an extension of time
849 is applied for and granted by the historic district commission.
850 (2) Request for extension of approval shall be made no later than 30 days
851 prior to the final approval expiration date. Upon receipt of such request,
852 the matter shall be considered at the next regularly scheduled meeting of
853 the historic district commission.
854 (3) In considering a request for an extension of approval, the historic district
855 commission shall consider, but not be limited to, the following:
856 (a) Whether the project has been delayed for reasons beyond the control
857 of the applicant, excluding economic or financial reasons.
858 (b) Whether the applicant has made substantial progress toward obtaining
859 final approvals.
860 (c) Whether there have been any significant changes in the surrounding
861 neighborhood.
862 (d) Whether there has been any related amendments to the zoning map or
863 text, or the comprehensive plan, or if any waivers or variances have
864 been granted.
865 (4) Requests for extensions shall be submitted in writing to the planning
866 office.
867 (5) Under no circumstances shall the historic district commission grant
868 extensions beyond 24 months from the date of first approval.
869 3.3 Historic district amendments.
870 3.31 Historic district commission review required. Any motion or petition to amend,
871 supplement, or repeal a historic district by the city council in accordance with section
Draft Amendments to Article 10 June 14, 2011 Page 23 of 33
Paj 49
872 5, amendments, shall require a report by the historic district commission as set forth
873 in article 3, subsection 21.4.
874 3.32 Review criteria for placing individual structures in a historic district. The historic
875 district commission may recommend that an individual structure or property be
876 placed in an existing contiguous historic district or be placed in a historic district
877 specifically created for the property or structure upon considering the following
878 criteria and factors:
879 (A) Significant value as part of the historical, cultural, artistic, social, ethnic or
880 other heritage of the nation, state or community;
881 (B) Association with an important person or event in national, state, or local
882 history.
883 (C) Representative of the distinguishing characteristics of an architectural type
884 inherently valuable for the study of a period, style, craftsmanship, method of
885 construction or use of indigenous material;
886 (D) Notable work of a master builder, designer, architect, or artist whose
887 individual genius has influenced an era;
888 (E) The desire of the owner to have the property designated;
889 (F) Increased potential of economic or community development.
890 3.33 Review criteria for amendments or creation of new historic districts. The historic
891 district commission may recommend amendments to an existing historic district,
892 recommend repeal of an existing historic district or recommend the creation of a new
893 historic district upon considering the following criteria:
894 (A) Any criteria listed in subsection 3.32.
895 (B) Distinctive character or homogeneity of architectural design or dates of
896 construction throughout the area.
897 (C) Identifiable by clear and distinctive boundaries.
898 (D) Repetition of distinguishing architectural or land use characteristics
899 throughout the area.
900 3.34 Public hearing required. For all proposed amendments to the boundary of the
901 historic district, the historic district commission shall hold a public hearing subject to
902 the following public notification procedures:
903 (A) The planning office shall advertise the public hearing in a newspaper of
904 general circulation at least 15 days prior thereto.
905 (B) The planning office shall notify, by mail, all directly affected property owners
906 and all property owners within 200 feet of the extreme limits of the properties
907 proposed for addition to or removal from the district as their names appear on
908 the municipal tax record at least 15 days prior thereto.
909 3.4 Demolition by neglect.
Draft Amendments to Article 10 June 14, 2011 Page 24 of 33
Paj 50
910 3.41 Responsibility of property owners. Property owners of properties within the
911 historic districts shall not allow their buildings to be demolished by neglect (see
912 definitions, article 12) by failing to provide ordinary maintenance or repair.
913 3.42 Responsibility of the historic district commission. The historic district
914 commission shall monitor the condition of historic properties and existing buildings
915 in the historic district to determine if they are being demolished by neglect by failing
916 to provide ordinary maintenance and repair (see definitions, article 12). In the event
917 that the commission determines a demolition by neglect is occurring, it shall carry out
918 the following:
919 (A) Determine and set forth steps required to remedy the situations or defects.
920 (B) Direct the city planner to inform the property owners of its findings,
921 determination, and recommended remedies.
922 (C) In the event that the property owners fail to commence work within the
923 reasonable time allotted by the commission, the commission may direct the
924 building inspector to begin proceedings under chapter 22, buildings, and
925 building regulations, article XI, dangerous buildings, of the Code of
926 Ordinances for the City of Dover to bring about the repair or demolition of the
927 building.
928 3.43 Responsibility of the city planner. The city planner shall notify the historic
929 district commission of buildings within the historic district that have been referred to
930 him by the building inspector that meet the definition of dangerous buildings under
931 the provisions of chapter 22 buildings and building regulations, article XI dangerous
932 buildings, of the Code of Ordinances for the City of Dover. In such cases the
933 commission shall determine if the building is being demolished by neglect. Before
934 referring a property to the commission for consideration as demolition by neglect, the
935 city planner shall give written notice to the owner, occupant, mortgagee, lessee,
936 agent, and all other persons having an interest in said building, as shown by the
937 records of the recorder of deeds of the county, to appear before historic district
938 commission at the time, date and location specified.
939 Section 4. Development information requirements.
940 4.1 In order to more effectively evaluate the probable impact of proposed development
941 and thereby to carry out the purposes of this ordinance when making decisions and
942 recommendations regarding development proposals, the planning commission, historic
943 district commission, or city planner may adopt a standard set of information
944 requirements, which may be updated from time to time as necessary.
945 4.2 The information requirements shall be administered by the city planner and shall be a
946 part of submission requirements for all applications to the planning commission.
947 Section 5. Amendments.
Draft Amendments to Article 10 June 14, 2011 Page 25 of 33
Paj 51
948 This ordinance or any part thereof may be amended, supplemented or repealed, from time
949 to time, by the city council on its own motion or upon application, as provided in chapter
950 3 of title 22, Municipalities of the Delaware Code Annotated (22 Del. C. § 301 et seq.).
951 Every such proposed amendment shall be referred by the city council to the planning
952 commission for a report before the public hearing. The city council shall not take action
953 on any such amendment without a report from the planning commission unless the
954 planning commission fails to render such a report within 75 days after its regularly
955 scheduled meeting following such referral.
956 5.1 Types of amendments to the ordinance. The following are the types of amendments
957 that may be made to the ordinance:
958 5.11 Zoning text amendments. Amendments to ordinance text may be made upon
959 initiation of the city planner or under sponsorship of three members of city council.
960 5.12 Map amendment by application. A property owner may make application to the
961 city for amendment of the zoning map as it relates to his property. Amendments to the
962 zoning map may also be initiated by sponsorship of three members of city council and
963 shall be considered under the procedures of subsection 5.3 as it relates to applications
964 for map amendments.
965 5.13 Comprehensive zoning map amendment. Amendment to the zoning map as a
966 result of a new, revised, or amended comprehensive plan, or other formal plan or
967 study shall be considered as a comprehensive zoning map amendment and shall be
968 initiated by the planning office.
969 5.2 Procedure for zoning text amendments in accordance with subsection 5.11.
970 5.21 Public hearing and notice. An amendment to the ordinance text shall be subject
971 to public hearing before the planning commission and city council prior to adoption.
972 Such hearing shall be advertised in a newspaper of general circulation at least fifteen
973 (15) days prior to the planning commission hearing. Such notices shall state the date,
974 time and place of the planning commission and city council hearings and a brief
975 description of the proposed zoning text amendment, and specify that documents are
976 available in the planning office for review.
977 5.22 City planner report. For each proposed zoning text amendment, the city planner
978 shall issue a report to the planning commission and city council, including comments
979 from other reviewing agencies, that evaluates the following factors:
980 A) Whether such change is consistent with the aims and principles embodied in
981 the ordinance as to the particular zones concerned; and
982 B) Whether such proposed amendment is consistent with the aims of the
983 comprehensive plan of the city.
Draft Amendments to Article 10 June 14, 2011 Page 26 of 33
Paj 52
984 5.23 Report of the planning commission. Regarding each proposed amendment to the
985 ordinance text, the planning commission shall provide a report to the city council
986 stating a recommended action with regards to the proposed amendment, along with
987 the commission’s evaluation of the following factors:
988 A) Whether such change is consistent with the aims and principles embodied in
989 the ordinance as to the particular zones concerned; and
990 B) Whether such proposed amendment is consistent with the aims of the
991 comprehensive plan of the city.
992 5.3 Application procedure for zoning map amendments in accordance with subsection
993 5.12.
994 5.31 Preapplication Meeting. Prior to the submission of a zoning map amendment
995 application, the applicant or his representative shall meet in person with the city
996 planner or his designee to discuss the rezoning request. The purpose of this meeting
997 shall be to discuss proposed uses or developments and to review the process and
998 submission requirements.
999 5.32 Application. Application for a zoning map amendment shall be submitted to the
1000 city planner, on forms approved by the planning commission, along with a fee as
1001 provided for in Appendix F--Fees and Fines, and copies of a site map as described
1002 below.
1003 (A) Submission requirements accompanying applications for amendments to the
1004 zoning map. The applicant shall cause a site map to be prepared by a civil
1005 engineer, surveyor, land planner, or architect. The applicant shall submit
1006 copies of the site map to the city planner. The elements to be included on the
1007 site map are listed below:
1008 (1) Scale and dimensions. The map shall be at least 8.5 by 11 inches and at a
1009 scale of ten, 20, 30 or 40 feet to the inch, except that if the property has a
1010 maximum dimension over 900 feet, a scale of 50 feet to the inch may be
1011 used.
1012 (2) Legal data.
1013 (a) Tax parcel identification number.
1014 (b) Name and address of the owner of record.
1015 (c) Name and address of the equitable owner, if any.
1016 (d) Name and address of the person, firm or organization preparing the
1017 map.
1018 (e) Date, north point and written and graphic scale.
1019 (f) Sufficient description of information to precisely define the boundaries
1020 of the property and that portion of the property for which a rezoning is
1021 requested; and total acreage for which a rezoning is requested. All
1022 distances shall be in feet and hundredths of a foot. All angles shall be
Draft Amendments to Article 10 June 14, 2011 Page 27 of 33
Paj 53
1023 given to the nearest second or closer. The error of closure shall not
1024 exceed one in 10,000.
1025 (g) The locations, names and existing widths of adjacent street rights-of-
1026 way and curblines.
1027 (h) Location, width and purpose of all existing and proposed easements,
1028 reservations and areas dedicated to public use within or adjoining the
1029 property.
1030 (i) Existing and proposed zoning.
1031 (j) Any existing development on the property, including buildings, fences
1032 and landscape screening.
1033 (k) Full and complete information requested by the city planner in
1034 accordance with the development information requirements set forth in
1035 section 4.
1036 5.33 Setting of hearings and referral to planning commission. For any application to
1037 amend the zoning map, city council shall refer the proposed amendment to the
1038 planning commission and set dates for the public hearings to be held before the
1039 planning commission and city council.
1040 5.34 Advertisement of public hearing. Following referral of a zoning map amendment
1041 application to planning commission by city council, the applicant shall advertise the
1042 public hearing as follows:
1043 (A) The applicant shall notify by mail all property owners within a distance of 200
1044 feet of the extreme limits of the subject property of the public hearing dates,
1045 times and locations.
1046 (B) The applicant shall advertise the public hearings in a newspaper of general
1047 circulation at least fifteen (15) days prior to the planning commission hearing.
1048 Such notices shall state the date, time and place of the planning commission
1049 and city council hearings and a brief description of the proposed zoning map
1050 amendment, and specify that documents are available in the planning office
1051 for review.
1052 (C) The applicant shall also post a notice outlining the date, time, place, and
1053 nature of the hearings in a conspicuous location on the property. Such notice
1054 shall be designed in accordance with standards set forth by the planning
1055 commission and city council.
1056 (D) The applicant shall provide the planning office with a copy of the notice,
1057 verification of newspaper publication, a date-stamped photo of the property
1058 posting, and post office mail receipts indicating the date of mailing for all
1059 letters on or before the planning commission meeting date.
Draft Amendments to Article 10 June 14, 2011 Page 28 of 33
Paj 54
1060 5.35 City planner report. For each application for a zoning map amendment, the city
1061 planner shall transmit a report to the planning commission and city council, including
1062 comments from other reviewing agencies that evaluate the following factors:
1063 (A) Whether the uses permitted by the proposed change would be compatible with
1064 the existing uses and zones in the area concerned;
1065 (B) Whether adequate public services and infrastructure exist or can be created or
1066 expanded to serve the needs of any additional demand as a result of such
1067 change; and
1068 (C) Whether the proposed change is in accordance with the city’s current
1069 comprehensive plan.
1070 5.36 Report of the planning commission. Regarding each application for a zoning
1071 map amendment, the planning commission shall provide a report to the city council
1072 stating a recommended action with regards to the proposed amendment, along with
1073 the commission’s evaluation of the following factors:
1074 (A) Whether the uses permitted by the proposed change would be compatible with
1075 the existing uses and zones in the area concerned;
1076 (B) Whether adequate public services and infrastructure exist or can be created or
1077 expanded to serve the needs of any additional demand as a result of such
1078 change; and
1079 (C) Whether the proposed change is in accordance with the city’s current
1080 comprehensive plan.
1081 5.37 Amendment of zoning map. Following action by city council with regards to an
1082 application to amend the zoning map, the planning office shall update the zoning map
1083 to reflect the action of city council.
1084 5.38 Notice of decision. The city clerk shall send the applicant a letter notifying the
1085 applicant of the city council’s action regarding the application for a zoning map
1086 amendment.
1087 5.4 Procedure for comprehensive zoning map amendment in accordance with subsection
1088 5.13.
1089 5.41 Public hearing and notice. A comprehensive zoning map amendment shall be
1090 subject to public hearing before the planning commission and city council prior to
1091 adoption. The planning office shall advertise the public hearings as follows:
1092 (A) The planning office shall advertise the public hearing in two newspapers of
1093 general circulation at least fifteen (15) days prior to the planning commission
1094 hearing.
1095 (B) The planning office shall notify all affected property owners by mail at least
1096 15 days prior to the planning commission hearing, informing them of the
1097 proposed zoning map amendment as it relates to their property.
Draft Amendments to Article 10 June 14, 2011 Page 29 of 33
Paj 55
1098 (C) Such notices shall state the date, time and place of the planning commission
1099 and city council hearings and a brief description of the proposed zoning map
1100 amendment, and specify that documents are available in the planning office
1101 for review.
1102
1103 5.42 City planner report. For any comprehensive zoning map amendment, the city
1104 planner shall issue a report to the planning commission and city council, including
1105 comments from other reviewing agencies, that identifies:
1106 A) The reasons for the comprehensive zoning map amendment;
1107 B) All properties where a change in zone is proposed; and
1108 C) How the proposed changes to the zoning map support the city’s current
1109 comprehensive plan.
1110 5.43 Report of the planning commission. Regarding each application for a
1111 comprehensive zoning map amendment, the planning commission shall provide a
1112 report to the city council stating a recommended action with regards to the proposed
1113 amendment, along with the commission’s evaluation of the following factors:
1114 (A) Whether the uses permitted by the proposed change would be compatible with
1115 the existing uses and zones in the area concerned;
1116 (B) Whether adequate public services and infrastructure exist or can be created or
1117 expanded to serve the needs of any additional demand as a result of such
1118 change; and
1119 (C) Whether the proposed change is in accordance with the city’s current
1120 comprehensive plan.
1121 5.44 Adoption of comprehensive zoning map amendment. Upon adoption of the
1122 comprehensive zoning map amendment by city council, the zoning of properties shall
1123 be as reflected in the adopted map.
1124 5.45 Notice of decision. The city shall notify all affected property owners in writing
1125 with regards to any amendments to the zoning map that affect their properties.
1126 5.5 Amendment protests. In the case of a protest against any amendment, such
1127 amendment shall not become effective, except in accordance with the provisions of
1128 section 305 of chapter 3 of title 22, Municipalities, of the Delaware Code Annotated (22
1129 Del. C. § 305).
1130 5.6 Zoning map amendment approvals. In all cases where the city council shall approve
1131 an amendment to the zoning map, the said council shall find that, for reasons fully set
1132 forth in the said findings, such amendment is in conformity with the comprehensive plan
1133 for the city.
Draft Amendments to Article 10 June 14, 2011 Page 30 of 33
Paj 56
1134 5.61 Reconsideration, one-year limitation.
1135 (A) Whenever an amendment has been denied by the city council, such
1136 amendment, or one substantially similar, shall not be reconsidered sooner than
1137 one year from the date of the prior denial, except as provided in subsection
1138 (B) hereof.
1139 (B) Notwithstanding the provisions of subsection (A) hereof, the planning
1140 commission may request the council to reconsider an application within the
1141 one-year period from the denial of the same if the land use in the area has
1142 changed to such a degree that failure to do so would prevent proper planning
1143 and development of the area in question.
1144 5.7 Closed zones. Where the city finds that new development in a certain zone would be
1145 inconsistent with the purposes of this ordinance, but that elimination of or substantial
1146 changes to the zone would create a hardship for many owners of existing buildings and
1147 land in that zone, the city may declare the zone closed. The city council shall not accept
1148 or approve amendments to the zoning map which would place land in a closed zone.
1149 Closed zones include:
1150 (A) R-7;
1151 (B) RG-4;
1152 (C) RG-O, except in the downtown redevelopment target area as described in
1153 appendix C of the City of Dover Code of Ordinances.
1154 BE IT FURTHER ORDAINED:
1155 That Appendix F – Fees and Fines be amended by deleting the text shown in red bold
1156 strikethrough and replacing it with the text shown in blue bold italics as follows:
Appendix B—Zoning—Article 10—Planning Commission
Sec. 1 Approval of conditional uses
Subsec. 1.52 Application procedure; Conditional use $325.00,
permit; each application ..... plus $15.00 per acre of
the area or multiple
thereof involved in the
application
Sec. 2 Site development plan approval
Subsec. 2.45 Fees ..... Application for site
2.42 development plan
approval—$325.00
Application for
administrative site
Draft Amendments to Article 10 June 14, 2011 Page 31 of 33
Paj 57
plans—$125.00
Subsec. Fees…. Application for site
2.43 development plan
approval—$325.00
Sec. 3 Historic district commission and architectural review
Subsec. 3.25 Procedures for an architectural review by the historic district
3.26 commission or planning commission
Subsec. Application and fee for an $250.00
(b) architectural review certificate
.....
Sec. 5 Amendments
Subsec. 5.12 Fees
5.32
Each petition application for a Minimum fee of $325.00,
rezoning amendment ..... in addition to required
district supplemental fee
Residential and single-family (R- $10.00 per acre
7, R-8, R-10, R-15, and R-20);
supplemental fee .....
Multifamily (RG-0, RG-1, RG-2, $30.00 per acre
RG-3, RG-4, RG-5, RM-1, and
RM-2), cluster and MHP;
supplemental fee .....
Commercial and institutional (C- $50.00 per acre
1, C-1A, C-2, C-2A, C-3, CPO,
RC and IO); supplemental fee
.....
Shopping center development $60.00 per acre
(SC-1, SC-2 and SC-3);
supplemental fee .....
Manufacturing and industrial $60.00 per acre
development (M and IPM);
supplemental fee .....
All applications for $250.00
amendment to the zoning
Draft Amendments to Article 10 June 14, 2011 Page 32 of 33
Paj 58
ordinance (appendix B) .....
1157
1158 BE IT FURTHER ORDAINED:
1159 That the amendments shall be affective upon adoption of this ordinance and that any unexpired
1160 conditional use permit, site development plan, or architectural review certificate approval shall
1161 be eligible for extension of approval by the approving body for a period of time not to exceed 36
1162 months from the last day of the month during which initial approval was granted by that body.
1163
1164 SYNOPSIS
1165 The proposed ordinance would amend the
1166 procedures for conditional use permits, site
1167 development plans, architectural review certificates
1168 and amendments to the zoning ordinance. Included
1169 in the proposed amendments are measures to clarify
1170 and streamline certain review processes and expand
1171 public notification requirements.
Draft Amendments to Article 10 June 14, 2011 Page 33 of 33
Paj 62
the City.
• Requires that a description of the proposed use accompany the Conditional Use Permit application.
Proposed Changes to Site Development Plan Requirements
• Sets four types of reviews and the processes for each:
o Planning Commission Site Plan
• New buildings or building additions of 3,000 SF or greater (same as current)
• Addition of 5,000 SF of impervious cover (same as current)
• Non-residential site plans that includes more than 1,500 SF of disturbance (current threshold set at 500 SF)
o Site Development Master Plan
o Zoning Review
• New process — Currently these projects are required to be reviewed as an Administrative Site Plan
• No building or impervious cover expansion proposed
• Change of use within existing building
• Review with building permit review
o Administrative Site Plan
• New buildings, building additions, impervious cover, or disturbance below the Planning Commission Site Plan thresholds
• Same as current Administrative Site Plan Process
Historic District Commission
• Clarifies three types of Architectural Review Certification:
o Review and approval by City Planner at building permit submission
o Review and approval by Historic District Commission
o Review and recommendation by Historic District Commission for final action by the Planning Commission
• Clarifies process for amendments to the boundary of the Historic District
o Public hearing before the Historic District Commission
o Notice of hearing in newspaper and mailed to affected property owners and owners of properties within 300 feet of
affected properties — all 15 days prior to Historic District Commission Hearing
• Clarifies the procedures for "Demolition by Neglect" determination.
Amendments to the Zoning Ordinance
Establishes clear processes for applications to amend the Zoning Map (rezoning), amendments to the Zoning Map as a result of a
Comprehensive Rezoning, and amendments to the Zoning Text.
Summary of Proposed Changes to Article 10
July 8, 2011 Page 3 of 3
Paj 63
1 Code Mark-up Document
2 DRAFT Amendments to Zoning Ordinance, Article 10
3
4 ARTICLE 10. PLANNING COMMISSION
5
6 Section 1. Approval of conditional uses.
7 On application and after public notice and hearing, the commission may authorize the issuance
8 by the city planner of permits for any of the conditional uses for which this ordinance requires, in
9 the district in which such use is proposed to be located, the approval of such use by the
10 planning commission. In approving any such use, the planning commission shall take into
11 consideration the public health, safety and welfare, the comfort and convenience of the public in
12 general and of the residents of the immediate neighborhood in particular, and may prescribe
13 appropriate conditions and safeguards as may be required in order that the results of its action
14 may, to the maximum extent possible, further the expressed intent of this ordinance and the
15 accomplishment of the following objectives in particular:
16 1.1 Accessibility for emergency response fire and police protection. That all proposed
17 structures, equipment or material shall be readily accessible for fire, ambulance, and
18 police, and other emergency response protection;
19 1.2 Harmony of location, size and character. That the proposed use shall be of such
20 location, size and character that, in general, it will be in harmony with the appropriate and
21 orderly development of the zone in which it is proposed to be situated and will not be
22 detrimental to the orderly development of adjacent properties in accordance with the
23 zoning classification of such properties;
24 1.3 Residential zones. That, in addition to the above, in the case of any use located in, or
25 indirectly adjacent to, a residential zone:
26 a. The location and size of such use, the nature and intensity of operations
27 involved in or conducted in connection therewith, its site layout and its relation to
28 access streets shall be such that both pedestrian and vehicular traffic to and from
29 the use and the assembly of persons in connection therewith will not be hazardous
30 or inconvenient to, or incongruous with, the said residential district or conflict
31 with the normal traffic of the neighborhood; and
32 b. The location and height of buildings, the location, nature and height of walls
33 and fences, and the nature and extent of landscaping, and other improvements on
34 the site shall be such that the use will not hinder or discourage the appropriate
35 development and use of adjacent land and buildings.
36 1.4 Conditional use pPermits.
Draft Amendments to Article 10 April 1, 2011 Page 1 of 41
Paj 64
37 a. Conditional use approval. Any use for which a conditional use permit may be
38 granted shall be deemed to be a conforming use in the district in which such
39 use is located, provided that:
40 1. The provision in this ordinance under which such permit was issued
41 is still in effect;
42 2. Such permit was issued in conformity with the provisions of this
43 ordinance; and
44 3. Such permit shall be deemed to affect only the lot or portion thereof
45 for which such permit shall have been granted.
46 b. Periodic renewal of conditional use permit. The commission may require that
47 conditional use permits be periodically renewed. Such renewal shall be granted
48 following due public notice and hearing in accordance with subsection 1.53. ,
49 and may be withheld only The commission may withhold approval of the
50 renewal upon a determination by the city planner to the effect that such
51 conditions as may have been prescribed by the commission in conjunction with
52 the issuance of the original permit have not been, or are being no longer, complied
53 with. In such cases, a period of 60 days shall be granted the applicant for full
54 compliance prior to the revocation of the said permit.
55 Any use for which a conditional use permit may be granted shall be deemed
56 to be a conforming use in the district in which such use is located, provided
57 that:
58 a. The provision in this ordinance under which such permit was
59 issued is still in effect;
60 b. Such permit was issued in conformity with the provisions of this
61 ordinance; and
62 c. Such permit shall be deemed to affect only the lot or portion thereof
63 for which such permit shall have been granted.
64 c. Revocation of conditional use permit. If the city planner determines that the
65 conditions prescribed by the commission in conjunction with the issuance of the
66 conditional use permit have not been, or are no longer complied with, he shall
67 initiate the process for revocation of the permit according to the following
68 procedure:
69 1. The city planner shall notify the permit-holder in writing of the
70 noncompliance with the permit conditions and allow the permit-holder
71 30 days to comply with the permit conditions.
72 2. If, after 30 days, the city planner determines that the permit-holder
73 has not come into compliance with permit conditions, he shall notify the
Draft Amendments to Article 10 April 1, 2011 Page 2 of 41
Paj 65
74 permit-holder that the planning commission will hold a public hearing
75 on revocation of the conditional use permit.
76 3. The planning commission shall hold a public hearing for which
77 notice shall be completed by the planning office in accordance with the
78 provisions of section 1.53 of this article.
79 3. Following the public hearing, the planning commission shall take
80 action in the following regard:
81 a. Revoke the conditional use permit.
82 b. Issue a probationary period after which the commission shall
83 review the permit in accordance with the provisions regarding
84 periodic renewal of conditional use permit.
85 c. Determine that the conditional use may continue as initially
86 authorized.
87 1.5 Application procedure.
88 1.51 Preapplication Meeting. Prior to the submission of a conditional use application,
89 the applicant or his representative shall meet in person with the city planner or his
90 designee with a sketch plan. The purpose of this meeting shall be to discuss proposed
91 uses or developments and to review the process and submission requirements.
92 1.52 1.51 Application. Application for a conditional use permit shall be submitted in
93 triplicate to the city planner, on forms approved by the planning commission, at least 30
94 days prior to the planning commission meeting at which approval of the permit is to be
95 requested.
96 1.52 Each application for a conditional use permit shall be accompanied by a fee as
97 provided for in Appendix F--Fees and Fines.
98 1.53 Public hearing. Prior to the review and action on the conditional use permit
99 application, the commission shall hold a public hearing subject to the following public
100 notification procedures: to be advertised by the applicant
101 (a) The applicant shall advertise the public hearing in a newspaper of general
102 circulation at least 15 ten days prior thereto.
103 (b) The applicant shall notify by mail all property owners within 300 200 feet of
104 the extreme limits of the subject site plan property as their names appear on the
105 municipal tax record at least 15 ten days prior thereto.
106 (c) The applicant shall post a notice outlining the date, time, place, and nature
107 of the hearing in a conspicuous location on the property at least 15 days prior to
108 the planning commission hearing. Such notice shall be designed in accordance
109 with standards set forth by the planning commission.
Draft Amendments to Article 10 April 1, 2011 Page 3 of 41
Paj 66
110 (d) The applicant shall provide the planning office commission with a copy of
111 the notice, verification of newspaper publication, a date-stamped photo of the
112 property posting, and post office mail return receipts indicating the date of
113 mailing for all letters on or before the meeting date.
114 (e) Said notices shall state the date, time and place of the hearing, the site
115 location, a brief description of the conditional use site plan and shall state that a
116 copy of the conditional use application and plan is filed with the planning office
117 department for public review.
118 1.54 City planner report. For each application for a conditional use permit, the city
119 planner shall issue a report to the planning commission including comments from
120 other agencies and detailing how the application conforms to the requirements of the
121 zoning ordinance and other provisions of city and state codes. The city planner shall
122 certify on each application for a conditional use permit whether or not the
123 application meets the requirements of all zoning ordinance provisions other than
124 those of this section regarding conditional use permit approval.
125 1.55 a. The city planner shall transmit retain one copy and transmit two copies
126 of the report and summary of the application certified conditional use permit
127 application to the planning commission or its representative at least seven days
128 prior to the date of the meeting at which approval of the permit is to be requested.
129 1.56 1.55 Planning commission action. The planning commission shall act to approve
130 or disapprove any such request for a conditional use permit within 45 days after the
131 meeting at which approval is requested or within such additional time as may be
132 consented to by the applicant. Failure to act within 45 days or the additional time
133 consented shall be deemed approval. Planning commission disapproval shall include
134 written findings upon any element found contrary to the provisions or intent of this the
135 zoning code ordinance.
136 1.56 Notice of decision. The planning office shall send the applicant a letter notifying
137 the applicant of the planning commission’s decision on the conditional use permit
138 application. Such letter shall document any conditions and waivers approved as part of
139 the application approval. Whenever the planning commission denies an application
140 for conditional use, such application for conditional use, or an application on the same
141 property which is substantially similar, shall not be accepted for consideration by the
142 planning commission sooner than one year from the date of denial.
143 1.57 1.57 Amendments. Substantial Aamendments to or renewals of conditional use
144 permits shall be acted upon in the same manner as the original request for a conditional
145 use permit. The city planner shall review proposed amendments to determine if they
146 are substantial in nature. Amendments that are not deemed substantial may be
Draft Amendments to Article 10 April 1, 2011 Page 4 of 41
Paj 67
147 referred to the planning commission for consideration at the discretion of the city
148 planner.
149 1.58 1.58 Transfer of property. If the property is sold by the applicant or by any
150 affiliated member of a single corporate family of which the applicant or its parent
151 company is a member, after approval of the conditional use but before the proposed use
152 or construction of the proposed use is started, or if, within 24 months one year of the
153 approval, the proposed use or construction of the proposed use is not undertaken by or for
154 the applicant or any affiliated member of a single corporate family of which the applicant
155 or its parent company is a member, the conditional use approval shall be null and void,
156 unless an extension of time is granted by the planning commission.
157 1.59 Whenever the planning commission denies an application for conditional use,
158 such application for conditional use, or an application on the same property which
159 is substantially similar, shall not be accepted for reconsideration by the planning
160 commission sooner than one year from the date of denial.
161 1.59 Final plans and working drawings. Following approval by the planning
162 commission, the applicant shall develop final conditional use permit plans for approval
163 by the planning office. The planning office shall determine that all necessary
164 approvals have been issued by city departments, and outside regulatory agencies, prior
165 to issuing final plan approval. No building permit shall be issued until such time that
166 the planning office has issued final conditional use permit plan approval.
167 1.60 Expiration of planning commission approval.
168 (a) Conditional use approval shall expire on the last day of the 24th 12th month
169 after the date of final or conditional approval of the planning commission, if
170 construction of the work authorized or use permitted has not started or unless an
171 extension of time is applied for by the applicant and granted by the planning
172 commission. Approval shall also expire if the construction of work authorized has
173 stopped for a period of one year, unless an extension of time is applied for and
174 granted by the planning commission.
175 (b) Requests Application for extension of approval shall be made no later than 30
176 days prior to the final approval expiration date. Upon receipt of such requests
177 application, the matter shall be considered at the next regularly scheduled
178 meeting of the planning commission.
179 (c) In considering a request for an extension of approval, the planning
180 commission shall consider, but not be limited to, the following:
181 1. Whether the project has been delayed for reasons beyond the control of
182 the applicant, excluding economic or financial reasons.
Draft Amendments to Article 10 April 1, 2011 Page 5 of 41
Paj 68
183 2. Whether the applicant has made substantial progress toward
184 obtaining final approvals.
185 2. Whether the project is of a minor size and scale.
186 3. Whether there has been any significant changes in the surrounding
187 neighborhood.
188 4. Whether there has been any related amendments to the zoning map or
189 text, or the comprehensive plan, or if any waivers or variances have been
190 granted.
191 (d) Requests Applications for extensions shall be submitted in writing to the
192 planning office city by completing an application for extension approval
193 form, which may be obtained in city hall.
194 (e) Under no circumstances shall the planning commission grant extensions
195 beyond 36 24 months from the date of first approval.
196 1.6 Submission requirements for conditional use permits requiring site development
197 plan approval by the planning commission. The following submission requirements
198 shall accompany applications for conditional use permits where site development plan
199 approval by the planning commission is required by section 2.1 of Article 10. The
200 applicant shall cause a site map to be prepared by a civil engineer, surveyor, land planner,
201 or architect or other competent person. The applicant shall submit 15 copies of the site
202 map to the city planner building inspector, who shall retain one copy and transmit
203 nine copies to the planning commission or its representative at least seven days prior to
204 the meeting at which approval of the permit is to be requested. Elements to be included
205 on the site map are listed below:
206 1.61 Scale and dimensions. The map shall be at least 11 18 inches by 17 26 inches, but
207 not more than 24 inches by 36 inches and at a scale of ten, 20, 30 or 40 feet to the inch,
208 except that if the property has a maximum dimension over 900 feet, a scale of 50 feet to
209 the inch may be used.
210 1.62 Legal data:
211 (a) Tax parcel identification number. Lot, block, and section number of the
212 property.
213 (b) Name and address of the owner of record.
214 (c) Name and address of the equitable owner, if any.
215 (d) Name and address of the person, firm or organization preparing the map.
216 (e) Date, north point and written and graphic scale.
Draft Amendments to Article 10 April 1, 2011 Page 6 of 41
Paj 69
217 (f) Sufficient description of information to define precisely the boundaries of the
218 property and that portion of the property for which a conditional use permit is
219 requested, and the approximate total acreage of that portion of the property for
220 which a conditional use permit is requested. All distances shall be given in feet
221 and tenths of a foot. All angles shall be given to the nearest ten seconds or closer.
222 The error of closure shall not exceed one in 10,000.
223 (g) The locations, names and existing widths of adjacent street rights-of-way and
224 curblines.
225 (h) The locations and owners of record of all adjoining lands.
226 (i) Location, width and purpose of all existing and proposed easements, setbacks,
227 reservations and areas dedicated to public use within or adjoining the property.
228 (j) A complete outline of existing or proposed deed restrictions or covenants
229 applying to the property and recital of the deed references if they are of record.
230 (k) Existing zoning, including two location maps, one at a scale of 1,200 feet to
231 the inch, and one at a scale of 400 feet to the inch, showing the distance along all
232 adjacent roads to the nearest intersection.
233 1.63 Existing structures.
234 (a) Location of uses and outlines of structures, drawn to scale on or within 100
235 feet of the property.
236 (b) Paved areas, sidewalks and vehicular access between the site and public
237 streets.
238 (c) Other existing development, including fences and landscape screening.
239 1.64 Proposed use:
240 (a) A written description of the proposed use.
241 (b) (a) A designation of that portion of the existing structures to be devoted to the
242 proposed use and for which a conditional use permit has been requested.
243 (c) (b) A designation of that portion of the property to be devoted to the proposed
244 use, not requiring structures and for which a conditional use permit has been
245 requested.
246 (d) (c) A designation of the parking area and indication of the number of off-street
247 parking spaces.
248 (e) (d) Indication of on-site circulation pattern and access to the property from
249 adjacent roads.
250 1.65 Proposed development:
Draft Amendments to Article 10 April 1, 2011 Page 7 of 41
Paj 70
251 (a) Conditional use applications involving construction of new buildings and
252 structures shall include a site plan which reflects compliance with the minimum
253 requirements of article 10, section 2.54 of this ordinance.
254 1.66 Natural features:
255 (a) Topography of the site.
256 (b) Location of different soil types, as indicated by the Soil Survey of Kent
257 County prepared by the Natural Resources Conservation Service. The soils
258 information shall be supplemented by soil boring and percolation test data
259 requested by the city.
260 (c) Location of flood hazard areas as identified on the FEMA flood insurance
261 maps.
262 (d) Location of significant natural features, including, bodies of water, wetlands
263 and forest areas.
264 1.67 Requested information: Full and complete information requested by the city planner
265 in accordance with the development information requirements set forth in article 10,
266 section 4.
267 1.68 Miscellaneous information: Other information deemed by the planning commission
268 to be necessary to determine conformity with the intent of this ordinance.
269 1.7 Submission requirements for conditional use permits where site development plan
270 approval by the planning commission is not required. The following submission
271 requirements shall accompany applications for conditional use permits where site development
272 plan approval by the planning commission is not required by section 2.1 of this article, where
273 the applicant is seeking conditional use approval to occupy an existing structure. The
274 applicant shall submit copies of the site map conforming to the specifications listed below to
275 the city planner, who shall transmit copies to the planning commission at least seven days
276 prior to the meeting at which approval of the permit is to be requested. Elements to be included
277 on the site map are listed below:
278
279 1.71 Scale and Dimensions. The map shall be at least 8.5 inches by 11 inches and at a
280 scale of ten, 20, 30 or 40 feet to the inch, except that, if the property has a maximum
281 dimension over 900 feet, a scale of 50 feet to the inch may be used.
282 1.72 Existing Conditions. The existing building and conditions on the lot must be
283 depicted. It is permissible to utilize the most recent mortgage survey of the property for
284 this purpose. If conditions, such as buildings and building additions, paved areas,
285 landscaping and accessory structures, on the lot have changed since the survey was
286 completed, the applicant shall depict these changes on the plan to the best of his ability.
Draft Amendments to Article 10 April 1, 2011 Page 8 of 41
Paj 71
287 However, the nature and extent of such revisions must be approved by the city planner
288 at the required preapplication meeting.
289 1.73 Proposed use:
290 (a) A written description of the proposed use.
291 (b) A designation of that portion of the existing structures to be devoted to the
292 proposed use and for which a conditional use permit has been requested.
293 (c) A designation of that portion of the property to be devoted to the proposed
294 use, not requiring structures and for which a conditional use permit has been
295 requested.
296 (d) A designation of the parking area and indication of the number of off-street
297 parking spaces.
298 (e) Indication of on-site circulation pattern and access to the property from
299 adjacent roads.
300 1.74 Additional Information. The city planner and/or planning commission may
301 request more detailed information, including but not limited to architectural floor
302 plans, on a case-by-case basis at their discretion.
303 1.75 Legal data:
304 (a) Tax parcel identification number.
305 (b) Name and address of the owner of record.
306 (c) Name and address of the equitable owner, if any.
307 (d) Name and address of the person, firm, or organization preparing the map.
308 (e) Date, north point, and written and graphical scale.
309 (f) The location and names of adjacent streets.
310 (g) The location, zoning, and owners of record of all adjacent properties.
311 Section 2. Site development plan approval.
312 2.1 Required. Site development plan approval shall be required for the erection or
313 enlargement of all structures and the establishment of any use for which site development
314 plan approval is required by this ordinance. Site development plan shall be required
315 according to the following criteria:
316 2.11 Planning commission site plan review. Site development plans shall be
317 referred to the planning commission for consideration and review include any
318 of the following:
319 (a) Site plans for new structures and building additions of 3,000 square
320 feet or greater in floor area; or
321 (b) Site plans with a total of 5,000 square feet or greater of new or added
322 impervious surface, including new structures or building additions; or
Draft Amendments to Article 10 April 1, 2011 Page 9 of 41
Paj 72
323 (c) Nonresidential site plans with site disturbance greater than 1,500
324 square feet and adjacent to residential uses or residential zones.
325 2.12 Site development master plan. Site development master plans shall be
326 subject to review and approval by the planning commission in accordance with
327 Article 10, Section 2.44.
328 2.13 Zoning review. For site development plans involving construction of a
329 single family detached, single family attached, or single family semi-detached
330 dwelling; an accessory structure; or a non-residential change of use for which
331 no building addition or increase in impervious cover is proposed, the city
332 planner or his designee may approve the site development plan in conjunction
333 with building permit review.
334 2.14 Administrative site plan. All site development plans that do not meet the
335 thresholds for zoning review in accordance with section 2.13 or planning
336 commission site plan review in accordance with section 2.11 shall be reviewed
337 as administrative site development plans.
338 2.2 Objectives. In considering and acting upon site development plans, the public health,
339 safety and welfare, the comfort and convenience of the public in general and of the
340 residents of the immediate neighborhood in particular shall be taken into consideration
341 and appropriate conditions and safeguards may be prescribed as may be required that the
342 results of approval its action may, to the maximum extent possible, further the expressed
343 intent of this ordinance and the accomplishment of the following objectives in particular:
344 2.21 Maximum safety and convenience of vehicular, transit, bicycle, and
345 pedestrian traffic by ensuring that all proposed and impacted streets, driveways
346 and walkways are adequate, but not excessive in number, adequate in width,
347 grade, alignment, capacity, and visibility, and suitably located, particularly with
348 respect to their connections with public streets.
349 2.22 The provision of adequate access to all proposed structures, equipment, or
350 material on the site for fire, ambulance, and police, and other emergency
351 services protection.
352 2.23 The provision of adequate off-street parking to accommodate the vehicles of
353 persons connected with or visiting the use and to obviate the parking of such
354 vehicles in public streets.
355 2.24 A site layout (including the location, power, direction, and time of any
356 outdoor lighting of the site) which would have no adverse effect upon adjacent
357 properties.
358 2.25 Landscaping of the site in a manner which is in character with that generally
359 prevailing in the neighborhood and which provides reasonable screening, at all
Draft Amendments to Article 10 April 1, 2011 Page 10 of 41
Paj 73
360 seasons of the year, of all playgrounds, parking areas, and service areas from the
361 view of adjacent residential properties and streets.
362 2.26 In applicable cases, a drainage system and layout which would afford the
363 best solution to any drainage problems.
364 2.27 Ensure that large scale development projects involving extended construction
365 periods are planned and implemented in accordance with an approved site
366 development master plan.
367 2.28 Consideration shall be given to the physical orientation and architectural
368 characteristics of proposed buildings, the relationship of proposed buildings to
369 existing buildings and to other proposed buildings, and their contributions to the
370 overall image of the immediate vicinity by considering the building and
371 architectural design guidelines as set forth in article 5, section 19. Design
372 characteristics of proposed buildings and building additions shall not detract or
373 devalue existing buildings in the immediate vicinity.
374 (a) If the planning commission determines that the proposed physical
375 orientation and architectural characteristics of the proposed buildings do
376 not meet the intent and objectives of this section, then the planning
377 commission shall refer the proposal to the architectural review oversight
378 subcommittee for review and comment.
379 (b) The subcommittee shall meet and review the proposal with the
380 applicant, and return its comments to the planning commission by the next
381 regularly scheduled meeting.
382 (c) The architectural review oversight subcommittee shall be appointed by
383 the commission at its annual meeting, and membership shall consist of two
384 planning commission members, and two design professionals with
385 experience in construction, and the mayor or the mayor's designee. Two
386 alternate design professionals with experience in construction shall also be
387 appointed.
388 2.3 Effect of site development plan approval. No building permit will be issued for any
389 structure covered by this section until an approved site development plan or approved
390 amendment of any such plan has been secured by the applicant. No certificate of
391 occupancy will be issued for any structure or use of land covered by this section unless
392 the structure is completed or the land is developed or used in accordance with an
393 approved site development plan or approved amendment of any such plan.
394 2.4 Application Procedure.
395 2.41 Preapplication Meeting Presubmission conference. Prior to the submission of a
396 site development plan, the applicant or his representative shall meet in person with the
Draft Amendments to Article 10 April 1, 2011 Page 11 of 41
Paj 74
397 planning office and the city planner or his designee with a sketch plan. The purpose of
398 this meeting conference shall be to discuss proposed uses or developments in order to
399 determine, first, whether the site development plan application shall be submitted to the
400 city planner for consideration and review as an administrative site plan or shall be
401 referred to the planning commission. Site development plans that shall be referred to
402 the planning commission for consideration and review include any of the following:
403 (a) Site plans for new structures and building additions of 3,000 square feet
404 or greater in floor area; or
405 (b) Site plans with a total of 5,000 square feet or greater of new or added
406 impervious surface, including new structures, or building additions; or
407 (c) Nonresidential site plans with site disturbance greater than 1,000 500
408 square feet and adjacent to residential properties.
409 If the application is to be referred to the planning commission, the applicant shall
410 be informed at the preapplication meeting presubmission conference meeting
411 which elements listed in subsection 2.5 below will be useful required in
412 determination of conformity with the provisions and intent of this section, along
413 with any other comments and suggestions intended to bring about conformity
414 with the provisions and intent of this section.
415 2.42Decision. Administrative site plan review
416 2.421 Process for administrative site plan application. If, as a result of the
417 preapplication meeting presubmission conference as described in subsection
418 2.41 of this ordinance, it is determined that the proposed uses or development is
419 of a type that may be approved by the city planner building inspector, the
420 applicant shall submit the application for site development plan approval, in
421 triplicate, on forms approved for that purpose, to the city planner building
422 inspector with the required documentation under the provisions of subsection 2.5
423 of this article, and a fee as provided for in Appendix F—Fees and Fines. The
424 city planner building inspector shall coordinate the reviews of the various
425 administrative departments of the City of Dover and outside regulatory agencies
426 and approve or disapprove the application within thirty (30) ten days of the date
427 of submission or refer it to the planning commission at their next scheduled
428 meeting.
429 2.43Disapproval. In the event that the building inspector disapproves an
430 application for site development plan approval, his disapproval shall include
431 written findings upon any site development plan element found contrary to
432 the provisions or intent of this ordinance. If an applicant feels aggrieved by
433 the disapproval of an application for site development plan approval by the
434 building inspector, the applicant may request a review and consideration by
Draft Amendments to Article 10 April 1, 2011 Page 12 of 41
Paj 75
435 the planning commission at the next regularly scheduled business meeting
436 and the building inspector shall forward the application, all pertinent
437 material submitted by the applicant and a copy of his written findings and
438 reasons for denial of the application to the planning commission or its
439 authorized representative.
440 2.422 Final plans and working drawings. Following initial review and comment
441 by the city planner, the applicant shall develop final construction plans for
442 approval by the planning office. The planning office shall determine that all
443 necessary approvals have been issued by city departments and outside
444 regulatory agencies prior to issuing final plan approval. No building permit
445 shall be issued until such time that the planning office has issued final site plan
446 approval.
447 2.423 Expiration. Administrative site development plan approval shall expire on
448 the last day of the 24th month after the date of final approval by the planning
449 office if construction of the work authorized or use permitted has not started or
450 unless an extension of time is applied for by the applicant and granted by the
451 city planner. Approval shall also expire if the construction of work authorized
452 has stopped for a period of one year unless an extension of time is applied for
453 and granted by the city planner.
454 2.424 Circumventing zoning requirements. Administrative site plans shall not
455 be used to circumvent the requirement of planning commission site plan review.
456 If the city planner determines that cumulative administrative site plans on a
457 property are being used to circumvent the requirements of the zoning ordinance
458 or other provisions of the Dover Code of Ordinances, he shall refer the
459 application to the planning commission, subject to the requirements of section
460 2.43.
461 2.44Submission to planning commission. At each regularly scheduled business
462 meeting of the planning commission, the building inspector shall submit to the
463 planning commission a list of all applications for site development plan approval
464 and a copy of the site development plans that he has approved since the last
465 regularly scheduled business meeting of the planning commission.
466 2.43 Planning commission site plan review.
467 2.431 Site development plan. If, as a result of the preapplication meeting as
468 described in subsection 2.41, it is determined that the proposed uses or
469 development is of a type that would be reviewed by the planning commission
470 and approval or disapproval of the application given by that body, the
471 application for site development plan approval shall be submitted to the city
472 planner on forms approved by the planning commission, at least 30 days prior
Draft Amendments to Article 10 April 1, 2011 Page 13 of 41
Paj 76
473 to the planning commission meeting at which approval is to be requested. The
474 application for site development plan approval shall be accompanied by a fee as
475 provided for in Appendix F--Fees and Fines.
476 2.432 Land subdivision. 2.441 If a proposed use or development requires
477 planning commission review under the land subdivision regulations of the City of
478 Dover as set forth in appendix A, the application for conditional approval of the
479 preliminary layout, under article IV, section B of that ordinance appendix A, and
480 the application for site development plan approval under this ordinance shall be
481 submitted and reviewed concurrently. The application for site development plan
482 approval shall be revised and all changed elements resubmitted and reviewed
483 concurrently with the application for plan approval under article IV, section C of
484 the land subdivision regulations set forth in appendix A.
485 2.45Fees. If, as a result of the presubmission conference as described in subsection
486 2.41, it is determined that the proposed uses or development is of a type that would
487 be reviewed by the planning commission and approval or disapproval of the
488 application given by that body, the application for site development plan approval
489 shall be submitted, in triplicate, to the building inspector, on forms approved by the
490 planning commission, at least 30 days prior to the planning commission meeting at
491 which approval is to be requested. The application for site development plan
492 approval shall be accompanied by a fee as provided for in Appendix F--Fees and
493 Fines. Applications for administrative site plans shall be accompanied by a fee as
494 provided for in Appendix F--Fees and Fines.
495 2.433 2.47 Public hearing. Prior to the review and action on the site plan
496 application, the commission shall hold a public hearing subject to the following
497 public notification procedures:
498 (a) The applicant shall advertise the public hearing to be advertised by
499 the applicant in a newspaper of general circulation at least 15 ten days
500 prior thereto.
501 (b) The applicant shall notify, by mail, all property owners within 300 200
502 feet of the extreme limits of the site plan property as their names appear on
503 the municipal tax record at least 15 ten days prior thereto.
504 (c) The applicant shall post a notice outlining the date, time, place, and
505 nature of the hearing in a conspicuous location on the property. Such
506 notice shall be designed in accordance with standards set forth by the
507 planning commission.
508 (d)The applicant shall provide the planning office commission with a
509 copy of the notice, verification of newspaper publication, a date-stamped
Draft Amendments to Article 10 April 1, 2011 Page 14 of 41
Paj 77
510 photo of the property posting, and post office mail return receipts
511 including the date of mailing for all letters on or before the meeting date.
512 (e) Said notices shall state the date, time and place of the hearing, the site
513 location, a brief description of the site plan and shall state that a copy of
514 the site plan application and plan is filed with the planning office
515 department for public review.
516 2.434 2.46 City planner report Building inspector certification. For each site
517 plan application to the planning commission the city planner shall issue a
518 report to the planning commission including comments from other agencies
519 detailing how the application conforms to the requirements of the zoning
520 ordinance and other provision of city and state codes. The city planner shall
521 transmit copies of the proposed site development plan and the city planner’s
522 report The building inspector shall certify on each application for site
523 development plan approval whether or not the application meets the
524 requirements of all zoning ordinance provisions. The building inspector shall
525 retain one copy and transmit two copies of the certified application for site
526 development plan approval to the planning commission or its authorized
527 representative at least seven days prior to the date of the meeting at which
528 approval of the site development plan is to be requested.
529 2.435 2.48 Planning commission action. The planning commission shall act to
530 approve or disapprove any application for site development plan received by it
531 either as an original review or as a referral from the city planner an appeal
532 under the provisions of subsection 2.422 2.43 of this article within 45 days or
533 within such additional time as may be consented to by the applicant. Failure to
534 act within 45 days or the additional time consented shall be deemed
535 approval. Planning commission disapproval shall include written findings upon
536 any site development plan element found contrary to the provisions or intent of
537 this the zoning ordinance.
538 2.436 Notice of decision. The planning office shall send the applicant a letter
539 notifying the applicant of the planning commission’s action regarding the site
540 plan application. Such letter shall document any conditions and waivers
541 approved or recommended as part of the application approval.
542 2.437 2.49 Final plans and working drawings. Following approval by the
543 planning commission, the applicant shall develop final site plans for approval
544 by the planning office. The planning office shall determine that all necessary
545 approvals have been issued by city departments and outside agencies regulating
546 street access and stormwater management, prior to issuing final plan approval.
547 No building permit shall be issued until such time that the planning office has
548 issued final site plan approval Final plans and working drawings shall not be
Draft Amendments to Article 10 April 1, 2011 Page 15 of 41
Paj 78
549 prepared for submission to the city planner for building permit approval
550 until after approval of the application for site development plan approval has
551 been obtained.
552 2.438 2.49.1 Amendments. Substantial aAmendments to an approved site
553 development plan shall be acted upon in the same manner as the original plan.
554 The city planner shall review proposed amendments to determine if they are
555 substantial in nature. Amendments that are not deemed substantial may be
556 referred to the planning commission for consideration at the discretion of the
557 city planner.
558 2.439 2.491 Expiration of planning commission approval.
559 (a) Site development plan approval shall expire on the last day of the 24th
560 12th month after the date of final or conditional approval of the planning
561 commission if construction of the work authorized or use permitted has
562 not started or unless an extension of time is applied for by the applicant
563 and granted by the planning commission. Approval shall also expire if the
564 construction of work authorized has stopped for a period of one year
565 unless an extension of time is applied for and granted by the planning
566 commission.
567 (b) For projects which are reviewed and approved by the planning
568 commission as site development master plans, approval of the master
569 plan shall remain valid for a period not to exceed five years from the
570 date of planning commission approval, provided that the authorized
571 construction or use has commenced within one year of approval and is
572 proceeding toward completion, unless an extension of time is applied
573 for by the applicant and granted by the planning commission. In
574 addition, the time between the completion of one phase and the
575 initiation of the next phase shall not exceed a period of two years.
576 Upon approval of a site development master plan by the planning
577 commission, the city planner or authorized designee shall have
578 approval authority over final plans governing each phase of
579 construction as depicted on the master plan.
580 (c) Request Application for extension of approval shall be made no later
581 than 30 days prior to the final approval expiration date. Upon receipt of
582 such request application, the matter shall be considered at the next
583 regularly scheduled meeting of the planning commission.
584 (d) In considering a request for an extension of approval, the planning
585 commission shall consider, but not be limited to, the following:
Draft Amendments to Article 10 April 1, 2011 Page 16 of 41
Paj 79
586 1. Whether the project has been delayed for reasons beyond the
587 control of the applicant, excluding economic or financial reasons.
588 2. Whether the project is of a minor size and scale.
589 2. Whether the applicant has made substantial progress toward
590 obtaining final approvals.
591 3. Whether there has been any significant changes in the
592 surrounding neighborhood.
593 4. Whether there has been any related amendments to the zoning
594 map or text, or the comprehensive plan, or if any waivers or
595 variances have been granted.
596 (e) Requests Applications for extensions shall be submitted in
597 writing to the planning office city by completing an application
598 for extension of approval form which may be obtained in city
599 hall.
600 (f) Under no circumstances shall the planning commission grant
601 extensions beyond 36 24 months from the date of first approval.
602 2.44 Site development master plans. Conceptual site development master plans
603 shall be reviewed by the planning commission in accordance with the provisions
604 of section 2.43. Conceptual site development master plans shall depict a site
605 development proposal that reflects general compliance with the provisions of
606 the zoning ordinance and shall also reflect the following information on the
607 plan:
608 2.441 Conceptual Master Plan. Conceptual Master Plan shall include
609 the proposed general layout of building, streets, parking, open space,
610 landscape concepts, and stormwater management areas.
611 (a) Detailed site construction plans, details, and specifications
612 are not required as part of a site development master plan
613 submission.
614 (b) The plan shall illustrate distinct phase boundaries for each
615 proposed construction phase and shall depict proposed
616 construction and site improvements planned for each phase.
617 Bulk quantities and area totals for each construction phase, and
618 for the total site, shall be tabulated in a data column on the plan.
Draft Amendments to Article 10 April 1, 2011 Page 17 of 41
Paj 80
619 (c) Each construction phase shall be enumerated in sequential
620 order on the site development master plan according to the order
621 of construction contemplated by the plan. Phases shall be
622 implemented in accordance with the approved site development
623 master plan unless the city planner approves an alternate
624 phasing.
625 (d) Each construction phase represented on the master plan shall
626 be planned and designed to function independent of construction
627 and site improvements contemplated in future construction
628 phases in all respects, including but not limited to bulk area
629 provisions of the zoning district in which the site is located, off-
630 street parking requirements, site entrances, emergency access
631 requirements, site utilities, and stormwater management
632 improvements except where the requirements and needs of a later
633 phase are met and remain met by a previous phase of completed
634 construction.
635 (e) Any special agreements or conditions of approval relative to
636 the overall development that have been specified by regulatory
637 agencies shall be documented on the site development master
638 plan.
639 2.442 Phased site plan approval. Individual phased components of the
640 Conceptual Master Plan are to be reviewed and approved as an
641 Administrative Site Plan. Final site construction plans, including
642 detailed site grading, paving, utilities, stormwater management, and tree
643 planting and preservation plans shall be submitted for final approval by
644 the city planner and/or authorized designee, and to other agencies
645 having jurisdiction, on a phase by phase basis in accordance with the
646 approved site development master plan, and all regulations of the City of
647 Dover governing the approval of site plans as set forth in this article 10,
648 section 2.4 of this ordinance.
649 2.443 Amendments. Substantial aAmendments to an approved site
650 development plan shall be acted upon in the same manner as the
651 original plan. The city planner shall review proposed amendments to
652 determine if they are substantial in nature. Amendments that are not
653 deemed substantial may be referred to the planning commission for
654 consideration at the discretion of the city planner.
Draft Amendments to Article 10 April 1, 2011 Page 18 of 41
Paj 81
655 2.444 Expiration of planning commission approval. For projects which
656 are reviewed and approved by the planning commission as Conceptual
657 Master Plans, approval of the conceptual master plan shall remain valid
658 for a period not to exceed five years from the date of planning
659 commission approval, provided that the authorized construction or use
660 has commenced within two years of approval and is proceeding toward
661 completion. In addition, the time between the completion of one phase
662 and the initiation of the next phase shall not exceed a period of two
663 years.
664 2.5 Site development plan elements submission requirements accompanying applications
665 for site development plan approval. The applicant shall cause a site development plan
666 map to be prepared by a civil engineer, surveyor, land planner, or architect or other
667 competent person. The applicant shall submit 15 copies of the site development plan
668 map to the city planner building inspector prior to or at the time of filing the formal
669 application for site development plan approval under the provisions of subsection 2.42,
670 subsection 2.43, or subsection 2.45 2.44 of this article. If the application is under the
671 provisions of subsection 2.45 2.43 or 2.44 of this article, the city planner shall retain one
672 copy and transmit nine copies of the site development plan map to the planning
673 commission or its authorized representative at least seven days prior to the meeting at
674 which approval of the application for site development plan approval is to be requested.
675 Site development plan elements shall include those listed below which are appropriate to
676 the proposed development or use as indicated in the preapplication meeting
677 presubmission conference required by the provisions of subsection 2.41 of this
678 ordinance.
679 2.51 Scale dimensions: Twenty Ten, 20, 30 or 40 feet to the inch, except that if the
680 property has a maximum dimension over 900 feet, a scale of 50 feet to the inch may be
681 used.
682 2.52 Legal data:
683 (a) Tax parcel identification number Lot, block, and section number of the
684 property.
685 (b) Name and address of the owner of record.
686 (c) Name and address of the equitable owner, if any.
687 (d) Name and address of the person, firm or organization preparing the map.
688 (e) Date, north point and written and graphic scale.
689 (f) Sufficient description of information to define precisely the boundaries of the
690 site, and total acreage of the site. All distances shall be given in feet and tenths of
Draft Amendments to Article 10 April 1, 2011 Page 19 of 41
Paj 82
691 a foot. All angles shall be given to the nearest ten seconds or closer. The error of
692 closure shall not exceed one in 10,000.
693 (g) The locations, names and existing widths of adjacent street rights-of-way and
694 curblines.
695 (h) The locations and owners of record of all adjoining lands.
696 (i) Locations, widths and purposes of all existing and proposed easements,
697 setbacks, reservations and areas dedicated to public use within or adjoining the
698 property.
699 (j) A complete outline of existing or proposed deed restrictions or covenants
700 applying to the property and recital of the deed references if they are of record.
701 (k) Existing zoning on the site and adjacent properties.
702 (l) Two location maps, one at a scale of 1,200 feet to the inch, and one at a scale
703 of 400 feet to the inch, showing the distance along all adjacent roads to the nearest
704 intersections.
705 (m) Record of any agreements between the applicant and the city regarding the
706 proposed development.
707 2.53 Natural features:
708 (a) Contour lines at vertical intervals of two feet for land with an average existing
709 slope of four percent or less, and at intervals of five feet for land with an average
710 existing slope greater than four percent.
711 (b) Location of different soil types, as indicated by the soil survey of Kent
712 County, prepared by the Natural Resources Conservation Service, and including
713 locations of flood hazard areas as identified in the FEMA Flood Insurance
714 Maps. The soils information shall be supplemented by soil boring and percolation
715 test data, if requested by the city.
716 (c) Location of significant natural features, including bodies of water, wetlands,
717 and forest areas.
718 2.54 Proposed development:
719 (a) Existing buildings and other structures.
720 (b) Location and width of all proposed streets and rights-of-way. Speed bumps or
721 speed dips for the purpose of slowing down traffic on any street shall not be
722 permitted.
723 (c) Location of all proposed structures, except one-family detached dwellings, and
724 an indication of the total number of dwelling units.
725 (d) Location and dimensions of all lot lines.
Draft Amendments to Article 10 April 1, 2011 Page 20 of 41
Paj 83
726 (e) Building setback lines on all lots.
727 (f) Location of all uses not requiring structures, including parks, playgrounds and
728 other open space areas.
729 (g) Location and plans for any outdoor signs.
730 (h) Location, direction, power and time of use for any proposed outdoor lighting.
731 (i) The location, size and arrangement of proposed sidewalks, driveways, loading
732 areas, off-street parking areas and other paved areas.
733 (j) Indication of the total amount of impervious surfaces and the development
734 coverage.
735 (k) Any proposed changes in elevation of the site and elevations of all streets,
736 parking areas, and building foundations. The datum to which all elevations,
737 including existing contour elevations, refer shall be clearly indicated on the plan.
738 (l) Plans for surface drainage of the site, if requested by the city. Such plans
739 shall include stormwater run-off calculations and shall show the proposed method
740 of accommodating the anticipated run-off.
741 (m) Any proposed below-ground or above-ground utilities and any contemplated
742 public improvements, including road improvements, on or adjoining the property.
743 Plans for such utilities and improvements shall indicate whether the developer, the
744 city, or other agency will bear the financial responsibility for the construction, and
745 which improvements are intended to be dedicated to the city.
746 (n) Proposed grading, screening and other landscaping, including types and
747 locations of proposed street trees.
748 (o) Architectural elevation drawings or other graphic representations illustrating
749 exterior building characteristics of proposed buildings and/or building additions
750 that would be visible from the public right-of-way. Elevation drawings shall be
751 drawn to scale and shall reflect major architectural elements such as exterior
752 surface materials, windows, doors, columns, and wall-mounted signage. Elevation
753 plans are intended to provide a general depiction of the physical appearance,
754 massing and scale of the proposed construction.
755 2.55 Requested information. Full and complete information requested by the city planner
756 in accordance with the development information requirements set forth in article 10,
757 section 4.
758 2.56 Development in stages Stage development compliance. If the site development
759 plan indicates more than only one stage of the development, supplementary material
760 shall be included to show compliance with article 5, section 9, development in stages.
Draft Amendments to Article 10 April 1, 2011 Page 21 of 41
Paj 84
761 2.57 Miscellaneous information. Other information deemed by the planning commission
762 to be necessary to determine conformity with the intent of this ordinance.
763 2.58 Site development master plans. Site development master plans shall depict a
764 generalized site development proposal that reflects general compliance with all
765 applicable provisions of article 10, subsection 2.5 above, and shall also reflect the
766 following information on the plan:
767 (1) The plan shall illustrate distinct phase boundaries for each proposed
768 construction phase and shall detail proposed construction and site
769 improvements planned for each phase. Bulk quantities and area totals for
770 each construction phase, and for the total site, shall be tabulated in a data
771 column on the plan.
772 (2) Each construction phase shall be enumerated in sequential order on the
773 site development master plan according to the order of construction
774 contemplated by the plan. Phases shall be implemented in accordance with
775 the approved site development master plan.
776 (3) Each construction phase represented on the master plan shall be planned
777 and designed to function independent of construction and site improvements
778 contemplated in future construction phases in all respects, including but not
779 limited to bulk area provisions of the zoning district in which the site is
780 located, off-street parking requirements, site entrances, emergency access
781 requirements, site utilities, and stormwater management improvements.
782 (4) Any special agreements or conditions of approval relative to the overall
783 development that have been specified by regulatory agencies shall be
784 documented on the site development master plan.
785 Site construction plans, details, and specifications are not required as part of
786 a site development master plan submission. Final site construction plans,
787 including detailed site grading, paving, utilities, stormwater management,
788 and tree planting and preservation plans shall be submitted for final
789 approval by the planning director, and/or authorized designee, and to other
790 agencies having jurisdiction, on a phase by phase basis in accordance with
791 the approved site development master plan, and all regulations of the City of
792 Dover governing the approval of site plans as set forth in this article 10,
793 section 2 of this ordinance.
794
795 Section 3. Historic district commission and architectural review.
796 3.1 Historic district commission established.
Draft Amendments to Article 10 April 1, 2011 Page 22 of 41
Paj 85
797 3.11 Creation and purpose. There shall be a historic district commission for the purpose
798 of assisting the planning commission and city planner in reviewing applications for
799 architectural review certifications as specified in subsection 3.2 of this article section; and
800 for making recommendations for designation of historic district zones; and for
801 establishing guidelines for the preservation and conservation of historic district zones;
802 and for advising other officials and departments in the City of Dover in matters
803 concerning historic preservation; and for reviewing all proposed National Register
804 nominations in the City of Dover; and for acting as a liaison on behalf of the City of
805 Dover to individuals and organizations concerned with historic preservation; and for
806 carrying out programs of historic preservation education in the City of Dover.
807 3.12 Appointment. The commission shall consist of five members nominated by the
808 mayor and approved by the city council, who are residents of the City of Dover and who
809 have demonstrated special interest, experience, or knowledge in history, architecture, or
810 historic preservation. Two of the members, to the extent available, shall be professional
811 members representing the professions of architecture, history, archaeology, planning,
812 historic preservation or related disciplines. At least two members shall be residents of the
813 district, and at least one shall represent the business within the district.
814 3.13 Term. The members of the commission shall serve for three-year staggered terms.
815 Vacancies shall be filled within 60 days in accordance with subsection 3.12 of the article
816 section.
817 3.14 Organization. The commission shall meet at least four times per year in a place that
818 is advertised in advance and open to the public and shall keep minutes of its meetings that
819 are available to the public. All review decisions shall be made in public. The commission
820 shall establish bylaws for its general procedure, which shall include a section addressing
821 conflicts of interest. The commission shall produce an annual report of its activity
822 that is kept on file for public review with the city planning office.
823 3.2 Architectural review certification.
824 3.21 Effect of architectural review certificate. No building permit or certificate of
825 occupancy may be issued for any structure in the historic district until an architectural
826 review certificate is issued as required under article 3, section 21, subsection 21.3 for the
827 historic district.
828 3.22 Architectural review certification by the historic district commission and city
829 planner. Certifications under this subsection shall not be subject to the requirements
830 in subsection 3.25 with respect to conferences, fees, applications, public notices, and
831 time to act.
832 (a) An architectural review certificate for specific classes of building permits,
833 including fences, signs, siding, window and door replacement, roofing, the
834 addition or replacement of decorative features, minor demolition, residential
Draft Amendments to Article 10 April 1, 2011 Page 23 of 41
Paj 86
835 additions, and other construction of a minor nature, may be issued by the historic
836 district commission or by the city planner when authorized by the historic
837 district commission, after a review and determination that the proposed
838 construction is in general accordance with the standards set forth in subsection
839 3.24 of this article section.
840
841 (b) The city planner may refer any permit application for demolition or
842 construction in the historic district for consultation with commission. The
843 historic district commission shall authorize the city planner to issue
844 architectural review certificates for certain classes and types of construction
845 that it warrants to be generally acceptable.
846 (b) The historic district commission shall issue architectural review
847 certificates for the construction or demolition of single- and two-family
848 homes, and nonresidential structures or additions involving a gross floor
849 area of 3,000 square feet or less, after review of proposed construction and
850 after a determination that the construction is in general accordance with the
851 standards set forth in subsection 3.24 below.
852 (c) All other applications for an architectural review certificate shall be
853 forwarded to the historic district commission for review and
854 recommendations to the planning commission in accordance with subsection
855 3.23(a) of this section.
856 (d) All decisions of the historic district commission or the city planner pursuant
857 to this section shall be documented on the building permit formalized in a
858 written notice of decision. When the commission or city planner grants a
859 conditional approval under this section, all conditions of approval shall be set
860 forth in writing on the building permit in the notice of decision. In the event of a
861 denial, the reasons for such denial shall be documented in a written notice of
862 decision shall state the reasons for denial and shall which shall identify all
863 elements of the application found to be contrary to the provisions or intent of this
864 section.
865 (e) An applicant may appeal the decision of the city planner to the historic district
866 commission to the planning commission, and such appeal shall be considered as
867 an architectural review certification application to the historic district planning
868 commission and shall meet all of the requirements set forth in subsection 3.22A
869 3.23 and subsection 3.25 of this section.
870 3.22A Architectural review certification by the historic district commission
871 (a) The historic district commission shall issue architectural review certificates
872 for the construction or demolition of single- and two-family homes, and
Draft Amendments to Article 10 April 1, 2011 Page 24 of 41
Paj 87
873 nonresidential structures or additions involving a gross floor area of 3,000
874 square feet or less, after review of the proposed construction and after a
875 determination that the construction is in general accordance with the standards
876 set forth in subsection 3.24 below.
877 (b) All applications to the historic district commission for architectural review
878 certification shall be subject to the procedures set forth in subsection 3.25.
879 (c) All decisions of the historic district commission pursuant to this section shall
880 be formalized in a written notice of decision. When the commission grants a
881 conditional approval under this section, all conditions of approval shall be set
882 forth in writing in the notice of decision. In the event of a denial, the notice of
883 decision shall state the reasons for denial and shall identify all elements of the
884 application found to be contrary to the provisions or intent of this section.
885 (d) An applicant may appeal the decision of the historic district commission to
886 the planning commission, and such appeal shall be considered as an
887 architectural review certification application to the planning commission and
888 shall meet all of the requirements set forth in subsection 3.23 and subsection
889 3.25 of this section.
890 3.23 Architectural review certification by the planning commission.
891 (a) The planning commission shall issue architectural review certificates referred
892 or appealed to it, upon review of the recommendations of the historic district
893 commission and upon a determination that the proposed construction is in
894 accordance with the standards set forth in subsection 3.24 below.
895 (b) All applications to the planning commission for architectural review
896 certification shall be subject to the procedures set forth in subsection 3.25.
897 (c) (b) All decisions of the planning commission pursuant to this section shall be
898 formalized in a written notice of decision. When the planning commission grants
899 a conditional approval under this section, all conditions of approval shall be set
900 forth in writing in the notice of decision. In the event of a denial, the notice of
901 decision shall state the reasons for denial and shall identify all elements of the
902 application found to be contrary to the provisions or intent of this section.
903 3.24 Architectural review standards.
904 (a) An architectural review certificate may be issued if it is found that the
905 architectural style, general design, height, bulk and setbacks, arrangement,
906 location and materials and structures affecting the exterior appearance are
907 generally in harmony with neighboring structures and complementary to the
908 traditional architectural standards of the historic district as set forth in the historic
909 district design guidelines and standards adopted by the planning commission and
Draft Amendments to Article 10 April 1, 2011 Page 25 of 41
Paj 88
910 as set forth in the United States Secretary of the Interior's Standards for
911 Rehabilitation.
912 (b) The city planner, historic district commission or planning commission shall
913 not consider normal maintenance and repair (see definitions, article 12), interior
914 arrangement, or building features not subject to public view.
915 3.25 Procedures for an architectural review by the historic district commission and/or
916 planning commission.
917 (a) Architectural preapplication meeting review conference. Prior to action on
918 any application for an architectural review certificate, the applicant shall meet in
919 person with the city planner or his delegated representative. The purpose of such
920 conference shall be to discuss the proposed construction or other action requiring
921 the certificate in order to determine what information is useful in the
922 determination of conformity with the provisions and intent of the historic district
923 regulation as expressed in this ordinance. It is generally recommended that
924 final construction plans and working drawings not be prepared for
925 submission to the building inspector for a building permit until a required
926 architectural review certificate is issued.
927 (b) Application and fee. The application to the historic district commission or
928 planning commission for an architectural review certificate and related
929 information shall be submitted in 20 copies to the city planner at least 30 days
930 prior to the historic district commission meeting at which review or approval is
931 requested and shall be accompanied by a fee as provided for in Appendix F--Fees
932 and Fines.
933 (c) Public hearing notice. Prior to the review and action on a architectural review
934 certification, the historic district commission shall hold a public hearing subject to
935 the following public notification procedures:
936 (1) The applicant shall advertise the public hearing to be advertised by
937 the applicant in a newspaper of general circulation at least 15 ten days
938 prior thereto.
939 (2) The applicant shall notify, by mail, all property owners within 300
940 200 feet of the extreme limits of the subject property as their names appear
941 on the municipal tax record at least 15 days prior thereto.
942 (3) The applicant shall post a notice outlining the date, time, place, and
943 nature of the hearing in a conspicuous location on the property. Such
944 notice shall be designed in accordance with standards set forth by the
945 planning commission.
Draft Amendments to Article 10 April 1, 2011 Page 26 of 41
Paj 89
946 (4) The applicant shall provide the planning office commission with a
947 copy of the notice, verification of newspaper publication, a date-stamped
948 photo of the property posting, and post office mail return receipts
949 indicating date of mailing for all letters on or before the meeting date.
950 (5) Said notices shall state the date, time, date and place of the hearings
951 before the historic district commission and planning commission, a brief
952 description of the project and shall state that a copy of the application and
953 plan is on file with the planning office department for public review.
954 (6) If the planning commission is reviewing a project in accordance with
955 other sections of this article, then the public hearing notice on those
956 applications must also give notice of architectural review certification.
957 (d) Application information. The applicant shall provide such information and
958 documents listed below which will satisfactorily illustrate the proposed action as
959 indicated in the architectural review conference preapplication meeting required
960 in subsection 3.25(a):
961 (1) All plan elements required in article 10, section 2.5.
962 (2) Plans and specifications indicating existing and proposed development,
963 including structures, architectural elevation drawings, trees and any other
964 landscaping, existing and proposed, including the general design, location
965 and orientation of structures in relation to curb line, right-of-way line and
966 neighboring buildings, colors, and materials to be used on exterior
967 surfaces, detailed plans for any signs, photographs of the existing site and
968 neighboring buildings, and such other information as will enable the
969 historic district commission or planning commission to determine
970 conformity with the ordinance.
971 (e) City planner report. For each site plan application to the planning
972 commission the city planner shall issue a report to the planning commission
973 including comments from other agencies detailing how the application
974 conforms to the requirements of the zoning ordinance and other provision of
975 city and state codes. The city planner shall transmit copies of the proposed site
976 development plan and the city planner’s report at least seven days prior to the
977 date of the meeting at which approval of the site development plan is to be
978 requested.
979 (f) (e) Time to act Historic district commission action. The historic district
980 commission shall act to review and render a recommendation to approve any such
981 application within 45 days of transmittal to the commission or within such
982 additional time as may be consented to by the applicant. Failure to act within 45
983 days or the additional time consented to shall be deemed to be a favorable
Draft Amendments to Article 10 April 1, 2011 Page 27 of 41
Paj 90
984 recommendation. Applications requiring planning commission approval
985 under subsection 3.23 of the article shall be transmitted by the historic
986 district commission to the planning commission for consideration at its next
987 available meeting. The planning commission shall act on any such approval
988 within 45 days of its meeting. Failure to act within 45 days shall be deemed
989 approval. The recommendation of the historic district commission shall be
990 forwarded to the planning commission and acted upon by the planning
991 commission in conjunction with action on the associated site development plan.
992 If a site development plan application is not filed in accordance with the
993 provisions of section 2.4 of this article within one year of recommendation, the
994 recommendation shall expire. The historic district commission may grant a one-
995 year extension of its recommendation upon written request by the applicant.
996 Such request shall be made in writing to the planning office at least thirty days
997 prior to the expiration of the historic district commission’s recommendation.
998 (f g) Substantial Amendments. Substantial A amendments to an application or an
999 architectural review certificate shall be acted upon in the same manner as the
1000 original plan.
1001 (g h) Expiration of architectural review certification issued by the historic district
1002 commission.
1003 (a) Architectural review certification approval shall expire on the last day
1004 of the 12th month after the date of final or conditional approval if
1005 construction of the work authorized or use permitted has not started or
1006 unless an extension of time is applied for by the applicant and granted by
1007 the historic district commission. Approval shall also expire if the
1008 construction of work authorized has stopped for a period of one year
1009 unless an extension of time is applied for and granted by the historic
1010 district commission.
1011 (b) Request Application for extension of approval shall be made no later
1012 than 30 days prior to the final approval expiration date. Upon receipt of
1013 such request application, the matter shall be considered at the next
1014 regularly scheduled meeting of the historic district commission.
1015 (c) In considering a request for an extension of approval, the historic
1016 district commission shall consider, but not be limited to, the following:
1017 1. Whether the project has been delayed for reasons beyond the
1018 control of the applicant, excluding economic or financial reasons.
1019 2. Whether the applicant has made substantial progress toward
1020 obtaining final approvals.
1021 2. Whether the project is of a minor size and scale.
Draft Amendments to Article 10 April 1, 2011 Page 28 of 41
Paj 91
1022 3. Whether there has been any significant changes in the
1023 surrounding neighborhood.
1024 4. Whether there has been any related amendments to the zoning
1025 map or text, or the comprehensive plan, or if any waivers or
1026 variances have been granted.
1027
1028 (d) Requests Applications for extensions shall be submitted in writing to
1029 the planning office. to the city by completing an application for
1030 extension of approval form which may be obtained in city hall.
1031 (e) Under no circumstances shall the historic district commission grant
1032 extensions beyond 24 months from the date of first approval.
1033 3.3 Historic district amendments.
1034 3.31 Historic district commission review required. Any motion or petition to
1035 amend, supplement, or repeal a historic district by the city council in accordance
1036 with article 10, section 5, amendments, shall require a report by the historic
1037 district commission as set forth in article 3, section 21.4.
1038 3.32 Review criteria for placing individual structures in a historic district. The
1039 historic district commission may recommend that an individual structure or
1040 property be placed in an existing contiguous historic district or be placed in a
1041 historic district specifically created for the property or structure upon considering
1042 the following criteria and factors:
1043 (a) Significant value as part of the historical, cultural, artistic, social, ethnic or
1044 other heritage of the nation, state or community;
1045 (b) Association with an important person or event in national, state, or local
1046 history.
1047 (c) Representative of the distinguishing characteristics of an architectural type
1048 inherently valuable for the study of a period, style, craftsmanship, method of
1049 construction or use of indigenous material;
1050 (d) Notable work of a master builder, designer, architect, or artist whose
1051 individual genius has influenced an era;
1052 (e) The desire of the owner to have the property designated;
1053 (f) Increased potential of economic or community development.
1054 3.33 Review criteria for amendments or creation of new historic districts. The
1055 historic district commission may recommend amendments to an existing historic
Draft Amendments to Article 10 April 1, 2011 Page 29 of 41
Paj 92
1056 district, recommend repeal of an existing historic district or recommend the
1057 creation of a new historic district upon considering the following criteria:
1058 (a) Any criteria listed in subsection 3.32 of this section.
1059 (b) Distinctive character or homogeneity of architectural design or dates of
1060 construction throughout the area.
1061 (c) Identifiable by clear and distinctive boundaries.
1062 (d) Repetition of distinguishing architectural or land use characteristics
1063 throughout the area.
1064 3.34 Public hearing required. For all proposed amendments to the boundary of
1065 the historic district, the historic district commission shall hold a public hearing
1066 subject to the following public notification procedures:
1067 (a) The planning office shall advertise the public hearing in a newspaper of
1068 general circulation at least 15 days prior thereto.
1069 (b) The planning office shall notify, by mail, all directly affected property
1070 owners and all property owners within 300 feet of the extreme limits of the
1071 properties proposed for addition to or removal from the district as their names
1072 appear on the municipal tax record at least 15 days prior thereto.
1073 3.4 Demolition by neglect.
1074 3.41 Responsibility of property owners. Property owners of properties within the
1075 historic districts shall not allow their buildings to be demolished by neglect (see
1076 definitions, article 12) by failing to provide ordinary maintenance or repair.
1077 3.42 Responsibility of the historic district commission. The historic district
1078 commission shall monitor the condition of historic properties and existing
1079 buildings in the historic district to determine if they are being demolished by
1080 neglect by failing to provide ordinary maintenance and repair (see definitions,
1081 article 12). In the event that the commission determines a demolition by neglect is
1082 occurring, it shall carry out the following:
1083 (a) Determine and set forth steps required to remedy the situations or
1084 defects.
1085 (b) Direct the city planner to inform the property owners of its findings,
1086 determination, and recommended remedies.
1087 (c) In the event that the property owners fail to commence work within the
1088 reasonable time allotted by the commission, the commission may direct
1089 the building inspector to begin proceedings under chapter 22, buildings,
1090 and building regulations, article XI, dangerous buildings, of the Code of
Draft Amendments to Article 10 April 1, 2011 Page 30 of 41
Paj 93
1091 Ordinances for the City of Dover to bring about the repair or demolition
1092 of the building.
1093 3.43 Responsibility of the city planner. The city planner shall notify the historic
1094 district commission of buildings within the historic district that meet the
1095 definition of dangerous buildings under the provisions of chapter 22 buildings
1096 and building regulations, article XI dangerous buildings, of the Code of
1097 Ordinances for the City of Dover. In such cases the commission shall determine
1098 if the building is being demolished by neglect. Before referring a property to the
1099 commission for consideration as demolition by neglect, the city planner shall
1100 give written notice to the owner, occupant, mortgagee, lessee, agent, and all
1101 other persons having an interest in said building, as shown by the records of the
1102 recorder of deeds of the county, to appear before historic district commission at
1103 the time, date and location specified.
1104 Section 4. Development information requirements.
1105 4.1 In order to more effectively evaluate the probable impact of proposed development
1106 and thereby to carry out the purposes of this ordinance when making decisions and
1107 recommendations regarding development proposals, the planning commission, historic
1108 district commission, or city planner may shall adopt a standard set of information
1109 requirements, which may be updated from time to time as necessary.
1110 4.2 The information requirements will consist of a series of written questions to be
1111 answered by all applicants for amendments to the zoning map, conditional use
1112 permits, or site development plan approval. The information requirements for any
1113 application will depend on the type and scale of the development proposed, and on
1114 the type of application.
1115 4.3 The information requirements shall be administered by the city planner and shall be a
1116 part of submission requirements for all applications to the planning commission.
1117 Section 5. Amendments.
1118 This ordinance or any part thereof may be amended, supplemented or repealed, from time
1119 to time, by the city council on its own motion or upon application on petition, as
1120 provided in chapter 3 of title 22, Municipalities of the Delaware Code Annotated (22 Del.
1121 C. § 301 et seq.). Every such proposed amendment shall may be referred by the city
1122 council to the planning commission for a report before the public hearing. The city
1123 council shall not take action on any such amendment without a report from the planning
1124 commission unless the planning commission fails to render such a report within 75 days
1125 after its regularly scheduled meeting following such referral.
1126 5.1 Types of amendments to the ordinance. The following are the types of amendments
1127 that may be made to the ordinance:
Draft Amendments to Article 10 April 1, 2011 Page 31 of 41
Paj 94
1128 5.11 Zoning text amendments. Amendments to ordinance text may be made
1129 upon initiation of the city planner or under sponsorship of three members of
1130 city council.
1131 5.12 Map amendment by application. A property owner may make application
1132 to the city for amendment of the zoning map as it relates to his property.
1133 Amendments to the zoning map may also be initiated by sponsorship of three
1134 members of city council and shall be considered under the procedures of section
1135 5.3 as it relates to applications for map amendments.
1136 5.13 Comprehensive zoning map amendment. Amendment to the zoning map as
1137 a result of a new, revised, or amended comprehensive plan, or other formal plan
1138 or study shall be considered as a comprehensive zoning map amendment and
1139 shall be initiated by the planning office.
1140 5.1Report of planning 0commission. In making such report after holding a public
1141 hearing on the proposed amendment, the planning commission shall make an
1142 inquiry and determination concerning the items specified below:
1143 5.11Amendments and changes in text. Concerning a proposed amendment to or
1144 change in text of this ordinance:
1145 a. Whether such change is consistent with the aims and principles embodied
1146 in the ordinance as to the particular zones concerned;
1147 b. Which areas and establishments will be directly affected by such change
1148 and in what way they will be affected;
1149 c. The indirect implications of such change in its effect on other regulations;
1150 and
1151 d. Whether such proposed amendment is consistent with the aims of the
1152 comprehensive plan of the city.
1153 5.111 Concerning a proposed amendments involving a change in the zoning map by
1154 way of a petition to rezone property or by way of annexation:
1155 a. Whether the uses permitted by the proposed change would be appropriate
1156 in the area concerned;
1157 b. Whether adequate public school facilities and other public services exist or
1158 can be created to serve the needs of any additional residence likely to be
1159 constructed as a result of such change;
1160 c. Whether the proposed change is in accord with any existing or proposed
1161 plans in the vicinity;
1162 d. The effect of the proposed amendment upon the growth of the city as
1163 envisaged by the comprehensive plan;
Draft Amendments to Article 10 April 1, 2011 Page 32 of 41
Paj 95
1164 e. Whether the proposed amendment is likely to result in an increase or
1165 decrease in the total zoned residential capacity of the city and the probable
1166 effect thereof.
1167 5.2 Procedure for zoning text amendments in accordance with 5.11.
1168 5.21 Public hearing and notice. An amendment to the ordinance text shall be subject to
1169 public hearing before the planning commission and city council prior to adoption.
1170 Such hearing shall be advertised in a newspaper of general circulation at least fifteen
1171 (15) days prior to the planning commission hearing. Such notices shall state the date,
1172 time and place of the planning commission and city council hearings and a brief
1173 description of the proposed zoning text amendment, and specify that documents are
1174 available in the Planning office for review.
1175 5.22 City planner report. For each proposed zoning text amendment, the city planner
1176 shall issue a report to the planning commission and city council, including comments
1177 from other reviewing agencies, that evaluates the following factors:
1178 1) Whether such change is consistent with the aims and principles embodied in
1179 the ordinance as to the particular zones concerned; and
1180 2) Whether such proposed amendment is consistent with the aims of the
1181 comprehensive plan of the city.
1182 5.24 Report of the planning commission. Regarding each proposed amendment to the
1183 ordinance text, the planning commission shall provide a report to the city council
1184 stating a recommended action with regards to the proposed amendment, along with the
1185 commission’s evaluation of the following factors:
1186 1) Whether such change is consistent with the aims and principles embodied in
1187 the ordinance as to the particular zones concerned; and
1188 2) Whether such proposed amendment is consistent with the aims of the
1189 comprehensive plan of the city.
1190 5.3 Application procedure for zoning map amendments in accordance with 5.12.
1191 5.31 Preapplication Meeting. Prior to the submission of a zoning map amendment
1192 application, the applicant or his representative shall meet in person with the city
1193 planner or his designee to discuss the rezoning request. The purpose of this meeting
1194 shall be to discuss proposed uses or developments and to review the process and
1195 submission requirements.
1196 5.32 Application. Application for a zoning map amendment shall be submitted to the
1197 city planner, on forms approved by the planning commission, along with a fee as
1198 provided for in Appendix F--Fees and Fines, and copies of a site map as described
1199 below.
Draft Amendments to Article 10 April 1, 2011 Page 33 of 41
Paj 96
1200 5.321 Submission requirements accompanying applications for amendments to
1201 the zoning map. The applicant shall cause a site map to be prepared by a civil
1202 engineer, surveyor, land planner, or architect. The applicant shall submit
1203 copies of the site map to the city planner. The elements to be included on the
1204 site map are listed below:
1205 (1) Scale and dimensions. The map shall be at least 8.5 by 11 inches and
1206 at a scale of ten, 20, 30 or 40 feet to the inch, except that if the property
1207 has a maximum dimension over 900 feet, a scale of 50 feet to the inch
1208 may be used.
1209 (2) Legal data.
1210 (a) Tax parcel identification number.
1211 (b) Name and address of the owner of record.
1212 (c) Name and address of the equitable owner, if any.
1213 (d) Name and address of the person, firm or organization
1214 preparing the map.
1215 (e) Date, north point and written and graphic scale.
1216 (f) Sufficient description of information to precisely define the
1217 boundaries of the property and that portion of the property for
1218 which a rezoning is requested; and total acreage for which a
1219 rezoning is requested. All distances shall be in feet and
1220 hundredths of a foot. All angles shall be given to the nearest
1221 second or closer. The error of closure shall not exceed one in
1222 10,000.
1223 (g) The locations, names and existing widths of adjacent street
1224 rights-of-way and curblines.
1225 (h) Location, width and purpose of all existing and proposed
1226 easements, reservations and areas dedicated to public use within
1227 or adjoining the property.
1228 (i) Existing and proposed zoning.
1229 (k) Any existing development on the property, including
1230 buildings, fences and landscape screening.
1231 (l) Full and complete information requested by the city planner
1232 in accordance with the development information requirements
1233 set forth in section 4.
Draft Amendments to Article 10 April 1, 2011 Page 34 of 41
Paj 97
1234 5.33 Setting of hearings and referral to planning commission. For any application to
1235 amend the zoning map, city council shall refer the proposed amendment to the
1236 planning commission and set dates for the public hearings to be held before the
1237 planning commission and city council.
1238 5.34 Advertisement of public hearing. Following referral of a zoning map amendment
1239 application to planning commission by city council, the applicant shall advertise the
1240 public hearing as follows:
1241 1) The applicant shall notify by mail all property owners within a distance of 300
1242 feet of the extreme limits of the subject property of the public hearing dates,
1243 times and locations.
1244 2) The applicant shall advertise the public hearings in a newspaper of general
1245 circulation at least fifteen (15) days prior to the planning commission hearing.
1246 Such notices shall state the date, time and place of the planning commission
1247 and city council hearings and a brief description of the proposed zoning map
1248 amendment, and specify that documents are available in the Planning office for
1249 review.
1250 3) The applicant shall also post a notice outlining the date, time, place, and nature
1251 of the hearings in a conspicuous location on the property. Such notice shall be
1252 designed in accordance with standards set forth by the planning commission
1253 and city council.
1254 4) The applicant shall provide the planning office with a copy of the notice,
1255 verification of newspaper publication, a date-stamped photo of the property
1256 posting, and post office mail receipts indicating the date of mailing for all letters
1257 on or before the planning commission meeting date.
1258 5.35 City planner report. For each application for a zoning map amendment, the city
1259 planner shall transmit a report to the planning commission and city council, including
1260 comments from other reviewing agencies, that evaluates the following factors:
1261 1) Whether the uses permitted by the proposed change would be compatible with
1262 the existing uses and zones in the area concerned;
1263 2) Whether adequate public services and infrastructure exist or can be created or
1264 expanded to serve the needs of any additional demand as a result of such
1265 change; and
1266 3) Whether the proposed change is in accordance with the city’s current
1267 comprehensive plan.
1268 5.36 Report of the planning commission. Regarding each application for a zoning map
1269 amendment, the planning commission shall provide a report to the city council stating
Draft Amendments to Article 10 April 1, 2011 Page 35 of 41
Paj 98
1270 a recommended action with regards to the proposed amendment, along with the
1271 commission’s evaluation of the following factors:
1272 1) Whether the uses permitted by the proposed change would be compatible with
1273 the existing uses and zones in the area concerned;
1274 2) Whether adequate public services and infrastructure exist or can be created or
1275 expanded to serve the needs of any additional demand as a result of such
1276 change; and
1277 3) Whether the proposed change is in accordance with the city’s current
1278 comprehensive plan.
1279 5.37 Amendment of zoning map. Following action by city council with regards to an
1280 application to amend the zoning map, the planning office shall update the zoning map
1281 to reflect the action of city council.
1282 5.38 Notice of decision. The city clerk shall send the applicant a letter notifying the
1283 applicant of the city council’s action regarding the application for a zoning map
1284 amendment.
1285 5.4 Procedure for comprehensive zoning map amendment in accordance with 5.13.
1286 5.41 Public hearing and notice. A comprehensive zoning map amendment shall be
1287 subject to public hearing before the planning commission and city council prior to
1288 adoption. The planning office shall advertise the public hearings as follows:
1289 1) The planning office shall advertise the public hearing in two newspapers of
1290 general circulation at least fifteen (15) days prior to the planning commission
1291 hearing.
1292 2) The planning office shall notify all affected property owners by mail at least 15
1293 days prior to the planning commission hearing, informing them of the proposed
1294 zoning map amendment as it relates to their property.
1295 3) Such notices shall state the date, time and place of the planning commission and
1296 city council hearings and a brief description of the proposed zoning text
1297 amendment, and specify that documents are available in the planning office for
1298 review.
1299 5.42 City planner report. For any comprehensive zoning map amendment, the city
1300 planner shall issue a report to the planning commission and city council, including
1301 comments from other reviewing agencies, that identifies:
1302 1) The reasons for the comprehensive zoning map amendment;
Draft Amendments to Article 10 April 1, 2011 Page 36 of 41
Paj 99
1303 2) All properties where a change in zone is proposed; and
1304 3) How the proposed changes to the zoning map support the city’s current
1305 comprehensive plan.
1306 5.43 Report of the planning commission. Regarding each application for a zoning
1307 map amendment, the planning commission shall provide a report to the city council
1308 stating a recommended action with regards to the proposed amendment, along with
1309 the commission’s evaluation of the following factors:
1310 1) Whether the uses permitted by the proposed change would be compatible with
1311 the existing uses and zones in the area concerned;
1312 2) Whether adequate public services and infrastructure exist or can be created or
1313 expanded to serve the needs of any additional demand as a result of such
1314 change; and
1315 3) Whether the proposed change is in accordance with the city’s current
1316 comprehensive plan.
1317 5.44 Adoption of comprehensive zoning map amendment. Upon adoption of the
1318 comprehensive zoning map amendment by city council, the zoning of properties
1319 shall be as reflected in the adopted map.
1320 5.45 Notice of decision. The city shall notify all affected property owners in writing
1321 with regards to any amendments to the zoning map that affect their properties.
1322 5.12Fees. Each petition for a rezoning amendment shall be accompanied by a
1323 minimum fee as provided for in Appendix F--Fees and Fines. In addition, each
1324 district would require supplemental fees per acre, as provided for in Appendix F--
1325 Fees and Fines, based on the following groupings: Residential and single-family (R-
1326 7, R-8, R-10, R-15, and R-20), multifamily (RG-0, RG-1, RG-2, RG-3, RG-4, RG-5,
1327 RM-1, and RM-2), cluster and MHP, commercial and institutional (C-1, C-1A, C-2,
1328 C-2A, C-3, CPO, RC and IO), shopping center development (SC-1, SC-2 and SC-3),
1329 and manufacturing and industrial development (M and IPM). All applications for
1330 amendment to the zoning ordinance appendix B shall be accompanied by a fee as
1331 provided for in Appendix F--Fees and Fines.
1332 5.13Public hearing; notice. The date, time and place of a public hearing shall be set
1333 and notice thereof shall be given in accordance with the provision of chapter 3 of
1334 title 22 of the Delaware Code (22 Del. C. § 301 et seq.).
1335 (a) When there is a petition to rezone property in accordance with subsection
1336 5.111, all property owners within a distance of 200 feet shall be notified by
Draft Amendments to Article 10 April 1, 2011 Page 37 of 41
Paj 100
1337 regular mail of the applications for rezoning. No fee shall be required for
1338 petitions filed in favor of or against a pending application.
1339 (b) When there is a proposed amendment to the zone map or zoning
1340 ordinance appendix B text as a result of a new, revised, or amended
1341 comprehensive plan, the planning commission and city council shall hold
1342 public hearings, to be advertised in two newspapers of general circulation at
1343 least 15 days prior to the planning commission hearing. Said notices shall
1344 state the time and place of the planning commission hearing and the city
1345 council hearing, a brief description of the proposed amendment or map
1346 depicting the proposed amended zoning map, and that the amended zoning
1347 map is filed at the Dover City Library, and with the planning department for
1348 public review.
1349 5.14 Proposed amendments. Should any proposed amendment consist of or include:
1350 5.141Boundary changes. Any change in the boundaries of any zone, which change
1351 would occur within a distance of 500 feet of the boundary of any other municipality;
1352 or
1353 5.142 Regulation changes. Any change in the regulations prescribed for any zone,
1354 any portion of which is located within 500 feet of such boundaries;
1355 the city clerk shall transmit to the municipal clerk of such other municipality a copy
1356 of the official notice of the public hearing thereon not later than the day after such
1357 notice appears in the official newspaper of the city.
1358 5.15Public hearing notice contents. All notices of public hearings shall specify:
1359 a. The nature of any proposed amendment;
1360 b. The land or district affected; and
1361 c. The date when, and the place where, the public hearing will be held.
1362 5.5 5.16 Amendment protests. In the case of a protest against any amendment, such
1363 amendment shall not become effective, except in accordance with the provisions of
1364 section 305 of chapter 3 of title 22, Municipalities, of the Delaware Code Annotated (22
1365 Del. C. § 305).
1366 5.6 5.17 Zoning map amendment approvals. In all cases where the city council shall
1367 approve an amendment to the zoning map, the said council shall find that, for reasons
1368 fully set forth in the said findings, such amendment is in conformity with the
1369 comprehensive plan for the city.
1370 5.18 Submission requirements accompanying petitions for amendments to the
1371 zoning map. The petitioner shall cause a site map to be prepared by a civil engineer,
Draft Amendments to Article 10 April 1, 2011 Page 38 of 41
Paj 101
1372 surveyor, land planner, architect or other competent person. The petitioner shall
1373 submit 15 copies of the site map to the city clerk. The elements to be included on the
1374 site map are listed below:
1375 5.181 Scale and dimensions. The map shall be at least 18 by 26 inches, but not more
1376 than 24 by 36 inches and at a scale of ten, 20, or 40 feet to the inch, except that if the
1377 property has a maximum dimension over 900 feet, a scale of 50 feet to the inch may
1378 be used.
1379 5.182Legal data.
1380 (a) Lot, block and section number of the property.
1381 (b) Name and address of the owner of record.
1382 (c) Name and address of the equitable owner, if any.
1383 (d) Name and address of the person, firm or organization preparing the map.
1384 (e) Date, north point and written and graphic scale.
1385 (f) Sufficient description of information to precisely define the boundaries of
1386 the property and that portion of the property for which a rezoning is
1387 requested; and total acreage for which a rezoning is requested. All distances
1388 shall be in feet and hundredths of a foot. All angles shall be given to the
1389 nearest second or closer. The error of closure shall not exceed one in 10,000.
1390 (g) The locations, names and existing widths of adjacent street rights-of-way
1391 and curblines.
1392 (h) Location, width and purpose of all existing and proposed easements,
1393 setbacks, reservations and areas dedicated to public use within or adjoining
1394 the property.
1395 (i) A complete outline of existing deed or proposed restrictions or covenants
1396 applying to the property and a recital of the deed.
1397 (j) Existing and proposed zoning.
1398 (k) Existing and proposed use.
1399 (l) Other existing development on the property, including fences and
1400 landscape screening.
1401 (m) Two location maps, one at a scale of 1,200 feet to the inch, and one at a
1402 scale of 400 feet to the inch, showing the distance along all adjacent roads to
1403 the nearest intersections.
1404 (n) Proposed access to the property from existing roads.
Draft Amendments to Article 10 April 1, 2011 Page 39 of 41
Paj 102
1405 (o) Significant natural features, including topography, location of flood
1406 hazard areas, and the location of different soil types as indicated by the Kent
1407 County soil survey. The soils information shall be supplemented by soil
1408 boring and percolation test data, if requested by the city.
1409 (p) Full and complete information requested by the city planner in
1410 accordance with the development information requirements set forth in
1411 section 4.
1412 5.183Rezoning to prior classification. In all cases where the city council shall
1413 approves an amendment to the zoning map because of a request for new
1414 construction of buildings or structures on the rezoned land or where new
1415 construction is required to carry out the new use on the rezoned land, the city
1416 council shall reconsider the zoning classification by having an amendment to rezone
1417 the land to its prior classification be automatically placed on the agenda by the city
1418 clerk, unless, within one year from the effective date of the amendment to the zoning
1419 map, one of the following conditions is met:
1420 a. New construction is started on the rezoned land according to the request
1421 for the amendment and such construction is proceeding in a normal and
1422 reasonable manner toward completion; or
1423 b. City council is given a satisfactory explanation for the failure to commence
1424 construction and reasonable written assurance that construction will
1425 commence soon after passage of the one-year period and will proceed in a
1426 normal and reasonable manner toward completion; or
1427 c. The current zoning is in conformance with the current comprehensive plan
1428 and its prior zone was not conforming with the current comprehensive plan.
1429 5.184 Reconsideration, one-year limitation.
1430 (a) Whenever a petition requesting an amendment, supplement, or change has
1431 been denied by the city council, such amendment petition, or one substantially
1432 similar, shall not be reconsidered sooner than one year from the date of the prior
1433 denial, except as provided in subsection (b) hereof.
1434 (b) Notwithstanding the provisions of subsection (a) hereof, the planning
1435 commission may request the council to reconsider an application within the one-
1436 year period from the denial of the same if the land use in the area has changed to
1437 such a degree that failure to do so would prevent proper planning and
1438 development of the area in question.
1439 5.19 Closed zones. Where the city finds that new development in a certain zone would be
1440 inconsistent with the purposes of this ordinance, but that elimination of or substantial
1441 changes to the zone would create a hardship for many owners of existing buildings and
Draft Amendments to Article 10 April 1, 2011 Page 40 of 41
Paj 103
1442 land in that zone, the city may declare the zone closed. The city council shall not accept
1443 or approve amendments to the zoning map which would place land in a closed zone.
1444 Closed zones include:
1445 (a) R-7;
1446 (b) RG-4;
1447 (c) RG-O, except in the downtown redevelopment target area as described in
1448 appendix C of the City of Dover Code of Ordinances.
Draft Amendments to Article 10 April 1, 2011 Page 41 of 41
Paj 104
Proposed Changes to Zoning Ordinance
Article 10 – Planning Commission
UPDATED Summary of Comments Received
Comment Submitted by Planning Staff Recommendation
Recommend allowing a two-year extension, total plan life Matt Spong, Landscape Staff recommends keeping a one-year extension
of four years. Architectural Services and total three year plan life.
Historic District Commission should review all projects on Historic District Commission This can be addressed in the Standards and
the Green and Constitution Place Guidelines.
Add back in the requirement of the Historic District Historic District Commission Staff supports this change
Commission to produce an annual report of its activity
Recommend that Site Development Master Plans have an Gregg Moore, Becker Morgan The current draft keeps the approval active for
approval for five years and eliminate the requirement that Group five years provided construction begins within
construction begin within one year and that construction two years of Planning Commission approval
not cease for more than two years between phases and that construction not cease for more than
two years between phases. Staff does not
support this change.
Recommend that the mailing distance for public notice Gregg Moore, Becker Morgan Staff supports this change but notes that the
remain at 200 feet from subject property rather than be Group expansion of the distance to 300 feet is
extended to 300 feet. consistent with the direction given by City
Council, through the Legislative, Finance and
Administration Committee in September 2010.
The minutes from this meeting are attached.
Recommend language clarifying the following: Glenn Mandalas, Attorney Staff supports these changes and has
• The Planning Commission must document incorporated them into a draft to be presented at
findings of fact in their decision regarding the Legislative, Finance & Administration
Conditional Use Permit revocation Committee.
• The state and city code requirements listed in the
City Planner Report is not a comprehensive list of
all such code requirements.
• Under Demolition by Neglect, clarify that the City
Planner shall notify the Historic District
Commission of dangerous buildings referred by
the Building Inspector.
June 13, 2011
Paj 106
Townshend, Ann Marie
From: Phil McGinnis <pjm@mcginnisrealty.com>
Sent: Tuesday, May 10, 2011 3:41 PM
To: CompPlan; Townshend, Ann Marie
Cc: 'Constantine F. Malmberg'; 'Paradee, John W.'; 'Tom Burns'; 'Holland Connie (OMB)';
jmolinaro@realtors.org
Subject: Article 10 amendments
Ann Marie‐
I appreciate being included in the Article meeting last week.
The mere thought of streamlining is appealing to me.
Further, more consistency in the timelines, deadlines, and other requirements are likewise welcomed.
I hope you will consider and provide for allowances for mixed‐use zoning conditions as we move closer to Smart Growth
principles.
I know Connie Holland is looking at developing a form‐based zoning guideline book, and I hope that all municipalities will
start planning for at least some aspect of form‐based zoning.
Looking forward to a wild ride through Article 10.
Phil McGinnis, CCIM, GAA, ALC, e-PRO
McGinnis Commercial Real Estate Company
302-736-2710 office
302-270-0656 cell
mailto:pjm@mcginnisrealty.com
1
Paj 107
Townshend, Ann Marie
From: Matt Spong <matt@las-llc.net>
Sent: Friday, May 13, 2011 2:09 PM
To: Townshend, Ann Marie; Melson-Williams, Dawn; Albert, Michael
Subject: Porposed changes zoning Oridiance
5-13-11,
As discussed at hearing last week Expiration of plans:
The proposed 2 year expiration after planning commission approval is a great idea.
Please consider a 2 year extension. In today's economy and regulatory environment this
extra time would be appreciated.
Thanks for your consideration.
Matt
Matthew, T . Spong RLA, ASLA, Principal
Landscape Architectural Services, L.L.C.
Phone: 302-284-4578
FAX: 302-284-0301
matt@las-llc.net
www.las-llc.net
The information in this communication and attachments is solely for the intended recipient.
This message, or any part thereof, shall not be disclosed, distributed, copied or retained
without the authorization of the sender. If you are not the intended recipient, please delete
this communication and attachments from your system.
1
Paj 108
Excerpt from Minutes of the Historic District Commission Meeting of April 21, 2011
Draft Zoning Text Amendment MI-11-06 Updates to Zoning Ordinance, Article 10 §3.
Historic District Commission and Architectural Review
Mrs. Melson-Williams stated that the Planning Staff has been working on what is Article 10 of
the Zoning Ordinance. Article 10 describes the process and procedures for Conditional Use
applications and Site Development Plans which are both Planning Commission processes. It
describes the processes for the Historic District Commission and Rezoning type of applications.
Mrs. Melson-Williams further stated that specifically what she has given you is the excerpt of
Article 10 which is Section 3 which is the Historic District Commission. It describes the
Historic District Commission, its appointment, and then the Architectural Review process. Your
packet included a Copy A excerpt and a Copy B excerpt. Copy A is taking the existing Code and
showing the editing marks. The existing Code is in black, where we are deleting statements is
notated in red with a strikethrough through it, and where we are adding text is in blue italics. We
have found in doing amendments to text, often times people want to know what did it say and
what are we putting in there.
Mrs. Melson-Williams further stated that Version B which Staff calls the “Black Ink Version” is
what it will ultimately look like once the editing is completed. Ignore the yellow highlights,
these are section references that Staff has to double check and make sure that numbers match and
that they are referring to the right section if things get re-numbered. We have done some work
on numbering in this section since we issued this to you. Before I start answering questions, this
is coming to you as an informational item. Staff is at the very beginning of what will be the
whole formal process in order to make these changes in the Zoning Ordinance. It has to appear
before a City Council Committee that is scheduled for next week. Staff will also be doing a
public outreach meeting to developers, architects, engineers, and folks that use this on a regular
basis that we deal with in using it. This will happen in May and we are hoping that the overall
Ordinance will start the formal review process in June. It has to go through a “First Reading”
with City Council, then a public hearing and review before the Planning Commission, and then
final public hearing and review with City Council. We are looking at mid-summer before any of
this would be put in place. The blue sheet outlined the key revisions and things that we are doing
with text amendment.
Mr. Scrafford questioned regarding line 322, Section A, it does not reference The Green as a
requirement. Line 322 states that the City Planner can do all those things and we specifically
requested that these things on The Green be referred to us at least for our review in order to
know that they are going on.
Mr. McDaniel stated that he agreed with Mr. Scrafford. He feels that we should also include
Constitution Place. Responding to Mr. McDaniel, Mrs. Melson-Williams stated that in the Draft
Design Guidelines what we had suggested was that The Green and Constitution Place that those
areas be treated specifically in that. It would include State Street to Water Street and from The
Green up to Loockerman Street. She is not sure how to implement that into here; however, they
will look at it.
Paj 109
Mr. Scrafford stated that it needs to be because as it stands right now, you do not need this
Commission. The way that it is written right now, the City Planner can do all of these things
without this Commission’s approval. Responding to Mr. Scrafford, Mrs. Melson-Williams
stated that the City Planner does not use a separate set of Guidelines and a portion of the Zoning
Ordinance that refers you to those Guidelines to do the activities and to do the Architectural
Review Certification may be enough to cover that or it may not.
Mr. Fisher questioned at our last meeting where we had the untimely application for extension,
this says a request for extension has to be thirty (30) days prior to expiration of the
Commission’s recommendation of one year. There is no provision in here for a waiver. If we
are going to have the power to waive should it be stated that the Commission has the power to
waive or the Commission does not have the power to waive? If it is silent he would assume that
they would not have the power to waive.
Mr. Salkin stated in Section 3.14 under “organization” the last sentence was crossed out that
stated “The Commission shall produce and annual report of its activity that is kept on file for
public review.” He does not object to this; however, it seems to him that there should be some
requirement that the summary of what we do whether it is annually, monthly, or quarterly should
be available to the public to explain a summary of the actions we have taken. It could be placed
on the website and not necessarily an annual report or a separate document.
Mr. Scrafford questioned where the minutes of this Commission are retained and available to the
public? Responding to Mr. Scrafford, Mrs. Melson-Williams stated that they are physically
retained in the Planning Office and they are accessible through the City’s website. All the
minutes from all of the various Boards, Commission, and Committees are available on the City’s
website.
Mr. Salkin stated that he was thinking some kind of summary form so that people could
understand what we do. Responding to Mr. Salkin, Mrs. Melson-Williams stated that she thinks
that they would put the sentence back in. She can tell you that the annual report that the
Planning Office does has a summary page of the applications that were heard and that is the
version of the chart that you see that has each years applications on it.
Note: At 4:00 PM Mr. McDaniel and Mr. Salkin left the meeting for other commitments.
Mr. Scrafford stated that the only other issue that he noticed was that there are places where we
do a recommendation for an Architectural Review Certificate and places where we actually issue
the Certificate. Responding to Mr. Scrafford, Mrs. Melson-Williams stated that this is one of the
things that we are trying to clarify. There are three (3) types of Architectural Review
Certifications. One is review by the City Planner with a Building Permit application as
referenced in 3.22A. Then there is review by the Historic District Commission meaning it
appears in front of you; you have the last say and issue the certificate. The third type of
Architectural Review Certification is recommendation by the Historic District Commission with
final action by the Planning Commission. This meaning the project is so big that it has to go to
the Planning Commission; however, stops with this Commission first and you put together a
series of recommendations on the Architectural Review Certificate. Your recommendation gets
Paj 110
forwarded onto the Planning Commission and the Planning Commission is the final say on the
Architectural Review Certification.
Note: At 4:11 PM Mr. Jackson left the meeting. Quorum was lost but no actions were taken;
only information presented to remaining members present.
Mr. Fisher stated on Line 995 and 996 in the blue language it states that “Such request shall be
made in writing to the Planning Office at least thirty days.” When you have the black ink copy
that line is not there, only in subsection d where the extension has to be made within thirty days
is it mentioned. Responding to Mr. Fisher, Ms. Cornwell stated that it is in there, line 818
through 820.
Mr. Fisher stated that his only concern regarding the thirty days is that it is clear in both copies,
no matter how you read it, and if the thirty day condition can be waived. His personal preference
would be no; however, it is not up to him to make that decision.
Ms. Melson-Williams stated that one thing that they did regarding Demolition by Neglect is that
we wrote a paragraph that clarifies what steps they need to do before it arrives before this
Commission.
Mr. Scrafford stated regarding 3.43A section starting with Line 1092 it does state that “The City
Planner shall notify the Historic District Commission;” however, it does not say when should it?
Responding to Mr. Scrafford, Mrs. Melson-Williams stated that the test with how it is written
here is if it is meeting the definition of “dangerous building” and then that dangerous building
then gives the citation for that. There may be something else in Chapter 22 that gives what the
responsibility of the Planner is regarding reasonable time.
Paj 113
CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JUNE 30, 2011
APPLICATION: TEXT AMENDMENTS: REVISIONS TO ARTICLE 10 OF
THE ZONING ORDINANCE
FILE #: MI-11-06
REVIEWING AGENCY: City of Dover Public Utilities Department
CONTACT PERSON: Steve Enss - Electric
Sharon Duca, P.E. - Water, Wastewater, Stormwater
CONTACT PHONE #: 302-736-7070
T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN
A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .
T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :
CITY AND STATE CODE REQUIREMENTS
ELECTRIC / WATER / WASTEWATER
1. Our office has no objections to the proposed amendments.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
ELECTRIC / WATER / WASTEWATER
1. None
ADVISORY COMMENTS TO THE APPLICANT
ELECTRIC / WATER / WASTEWATER
1. None.
I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE
C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .
Paj 114
CITY OF DOVER D
E
DEVELOPMENT ADVISORY COMMITTEE
L
APPLICATION REVIEW COMMENTARY D
O
D.A.C. MEETING DATE: June 30, 2011 T
===============================================================
APPLICATION: Text Amendment: Revision to Article 10 of the Zoning Ordinance
FILE#:MI-11-06 REVIEWING AGENCY: DelDOT
CONTACT PERSON: Julio F. Seneus PHONE#: 760-2145
===============================================================
THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN
ACCORDANCE WITH THIS AGENCY'S AUTHORITY AND AREA OF EXPERTISE.
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:
CITY & STATE CODE REQUIREMENTS:
1. The Department has no comments.
RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE
OBJECTIVES:
ADVISORY COMMENTS TO THE APPLICANT:
If you have any questions or need to discuss any of the above comments, please call the
above contact person and the planning department as soon as possible.
Paj 115
Appointment of the Architectural Review Oversight Subcommittee of
Planning Commission
As part of the Annual Meeting of the Planning Commission, one of the responsibilities of the
Planning Commission is to appoint the Architectural Review Oversight Subcommittee. The
following excerpt from the Zoning Ordinance is provided.
Appendix B: Zoning Ordinance, Article 10 Section 2. Site Development Plan Approval
2.28 Consideration shall be given to the physical orientation and architectural
characteristics of proposed buildings, the relationship of proposed buildings to existing
buildings and to other proposed buildings, and their contributions to the overall image of
the immediate vicinity by considering the building and architectural design guidelines as
set forth in article 5, section 19. Design characteristics of proposed buildings and
building additions shall not detract or devalue existing buildings in the immediate vicinity.
If the planning commission determines that the proposed physical orientation and
architectural characteristics of the proposed buildings do not meet the intent and
objectives of this section, then the planning commission shall refer the proposal to the
architectural review oversight subcommittee for review and comment. The subcommittee
shall meet and review the proposal with the applicant, and return its comments to the
planning commission by the next regularly scheduled meeting. The architectural review
oversight subcommittee shall be appointed by the commission at its annual meeting,
[and] membership shall consist of two planning commission members, and two design
professionals with experience in construction, and the mayor or the mayor's designee.
Two alternate design professionals with experience in construction shall also be
appointed.
The following excerpt is from Ordinance #2011-14 which is the proposed Text Amendment to
Article 10 of the Zoning Ordinance. The concept of architectural review by the Planning
Commission remains as part of the Code along with the appointment of the Architectural Review
Oversight Subcommittee.
From Ordinance #2011-14. Proposed Text of Appendix B: Zoning Ordinance, Article 10 Section
2. Site development plan approval.
2.28 Consideration shall be given to the physical orientation and architectural
characteristics of proposed buildings, the relationship of proposed buildings to
existing buildings and to other proposed buildings, and their contributions to the
overall image of the immediate vicinity by considering the building and architectural
design guidelines as set forth in article 5, section 19. Design characteristics of
proposed buildings and building additions shall not detract or devalue existing
buildings in the immediate vicinity.
(A) If the planning commission determines that the proposed physical orientation
and architectural characteristics of the proposed buildings do not meet the
intent and objectives of this section, then the planning commission shall refer
the proposal to the architectural review oversight subcommittee for review
and comment.
(B) The subcommittee shall meet and review the proposal with the applicant, and
return its comments to the planning commission by the next regularly
scheduled meeting.
(C) The architectural review oversight subcommittee shall be appointed by the
commission at its annual meeting, and membership shall consist of two
Paj 116
planning commission members, and two design professionals with
experience in construction, and the mayor or the mayor's designee. Two
alternate design professionals with experience in construction shall also be
appointed.
As of the Annual Meeting of the Planning Commission on July 19, 2010, the following
individuals were appointed to the Architectural Review Oversight Subcommittee of Planning
Commission.
Mr. Mike Hemmig, Planning Commission member
Colonel Robert Welsh, Planning Commission member
Mr. Terry Jackson, Architect with Jackson Architects, Design Professional
Mr. Jerry Peters, Facilities/Planning with Bayhealth Medical Center, Design Professional
Mayor’s designee (Mr. David Bonar upon confirmation of ability to serve)
Alternates: Mrs. Arden Bardol, Architect with Becker Morgan Group, Design Professional
Mr. Jack Pepper, Architect with Delaware Architects, LLC, Design Professional
The Planning Commission must appoint the members of the Subcommittee. The
membership of the Architectural Review Oversight Subcommittee shall consist the
following:
Planning Commission member
Planning Commission member
Design Professional with experience in construction
Design Professional with experience in construction
Mayor or Mayor’s designee
Alternates: 2 Design Professionals with experience in construction