CITY OF DOVER, DELAWARE
SPECIAL COUNCIL MEETING
Monday, November 07, 2022 at 5:15 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
VIRTUAL MEETING NOTICE
This meeting will be held in City Hall Council Chambers with electronic access via
WebEx. Public participation information is as follows:
Dial: 1-650-479-3208
Link: https://rb.gy/wagkg1
Event number: 2532 427 7094
Event password: DOVER (if needed)
If you are new to WebEx, get the app now at https://www.webex.com/ to be ready when the meeting
starts.
ADOPTION OF AGENDA
1. Evaluation of Bids - Demolition of Property at 235-239 West Loockerman Street, owned
by SAG Holdings, LLC
(Staff Recommends awarding the contract for demolition of 235-239 West Loockerman to
Design Contracting.)
ADJOURNMENT OF SPECIAL COUNCIL MEETING
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO
29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION
OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE
TIME OF THE MEETING
1
Paj 2
Item 1.
COMMITTEE ACTION FORM
PROCEEDING: City Council
DEPARTMENT OF ORIGIN: Planning & Inspections Department DATE SUBMITTED: 10/28/2022
PREPARED BY: Eddie Kopp, Chief Code Enforcement Officer
SUBJECT: Evaluation of Bid #23-0003PI: 235-239 W Loockerman St Demolition
REFERENCE: N/A
RELATED PROJECT: N/A
APPROVALS: David Hugg III, City Manager
EXHIBITS: RFP, Addendum, Bid Tabulation, & Recommended Bid
EXPENDITURE REQUIRED: $154,230.00
AMOUNT BUDGETED: $250.000
FUNDING SOURCE (Dept./Page in CIP & Budget): 110-11-16-20-000.53033 (Demolition Expenses)
TIMETABLE: Contract to be issued upon final approval.
RECOMMENDED ACTION: Staff recommends awarding the contract for demolition of 235-239 W
Loockerman St to Design Contracting
BACKGROUND AND ANALYSIS
City Council ordered the building repaired or demolished on August 15, 2022. There has been no improvement
to the building by the owner or interested parties. The building continues to worsen daily and poses a danger
to the public. Phase I of the asbestos abatement is wrapping up. Phase II of asbestos will be in conjunction
with the demotion of the building.
Bids were solicited and advertised according to City Policy by the City’s Contract and Procurement
Manager under Bid #23-0003PI. Four companies submitted bids. Three of the bids were complete and
the potential vendors were deemed to be capable and competent; therefore, pricing was the determining
factor in bid award. The lowest bidder did not fulfill all of the requirements requested during the RFP. Staff is
recommending that the contract be awarded to Design Contracting.
A summary of all are included in the packet.
2
Paj 3
Item 1.
City of Dover
October 4, 2022
To Whom It May Concern:
The City of Dover will receive sealed bids on October 26, 2022, at 2:00 PM local time for the
purpose of contracting for DEMOLITION OF A THREE‐STORY COMMERCIAL STRUCTURE WITH
BASEMENT LOCATED AT 235‐239 WEST LOOCKERMAN STREET, BID NUMBER 23‐0003PI. The
bid must be submitted with three (3) paper copies and one (1) electronic copy on either a
CD/DVD or flash drive in a sealed envelope to: City of Dover Procurement Office, 710 William
Street, Dover, DE 19904. All vendors must complete the Intent to Bid notice and send it via
email to doverwhse@dover.de.us or by fax to (302) 736‐7178 if they intend to submit a bid.
Any vendor not returning the form may not receive published addenda.
Your submission is not revocable for ninety (90) days following the response deadline indicated
above.
LATE SUBMISSIONS:
A bid received after the closing date and time for receipt of the bids is late and shall not be
considered. It is the responsibility of the submitter to ensure that the bid is received prior to
the closing date and time.
QUESTIONS:
If you have questions concerning this Intent to Bid, they must be made in writing and emailed to
me at doverwhse@dover.de.us. All questions must be submitted no later than October 13, 2022.
All questions will be compiled and answered in the form of an addendum and will be emailed to all
prospective bidders who return the attached ITB notice and will be posted on the City of Dover
web site, https://www.cityofdover.com/bid‐procurement. All changes or corrections to this
Intent to Bid will be handled by addenda issued by the Purchasing Office. The receipt of all addenda
must be acknowledged in the bid submission.
The City of Dover reserves the right to request corrections, clarifications, and/or additional
information pertaining to the bidder’s response.
Bids will be opened publicly at the time and place designated in this letter. All bids will be
opened in the presence of the Procurement Manager or his/her designee. The main purpose of
the bid opening is to reveal the name(s) of the bidder(s), not to serve as a forum for
determining the low bidder(s).
3
Paj 4
Item 1.
The contract shall be awarded within 90 days of the closing date to the bidder who is
determined in writing to be most advantageous to the City. All prices must be held firm for a
minimum of 90 days from the date of the bid opening. The bids and summaries shall not be
open for public inspection until after receipt of a fully executed contract.
Public employees and elected officials must discharge their duties impartially so as to assure
competitive access to governmental procurement by responsible contractors. Moreover, they
should conduct themselves in such a manner as to foster public confidence in the integrity of City
procurement. Dover Code Article II Section 30 (Appendix A of this policy), establishes standards of
ethical conduct among public officials and employees. Vendors participating in the City
procurement will be disqualified from the procurement if the employee, official or vendor is found
to be in violation of the City’s ethical standards and a referral of the matter will be presented to the
Ethics Commission.
Please reference the City of Dover Purchasing Policy if you have any questions at:
https://evogov.s3.amazonaws.com/media/27/media/47170.pdf
The City of Dover reserves the right to waive technicalities, to reject any or all submissions, or any
portion thereof, to advertise for new bids, to proceed to do the work otherwise, or to abandon the
work, if in the best interest of the City.
All vendors must completely fill out, sign, date, and return the attached “Consent for
Disclosure Under the Freedom of Information Act (FOIA)” form with their submission. Failure
to return the completed form will be deemed consent to the disclosure of all information
included in the submission after the receipt of a signed contract or issuance of a purchase
order. Any and all proprietary information contained within the bid must be isolated and
clearly marked. The cover must indicate that the bid contains such information.
Minority, women, veteran, service‐disabled, veteran, and individuals with disabilities owned
vendor preference shall be three percent (3%) of the value of the award. The vendor must
identify qualification and claim to the preference on the submitted bid documents. The
vendor must provide authoritative proof of minority ownership such as identification in the
certification directory maintained by the State of Delaware Office of Supplier Diversity to
qualify for this preference. This preference is to be considered as a stand‐alone and cannot be
added to any other preference that may be allowed. This preference shall not apply to
subcontractors.
Local vendor preference shall be considered for materials, equipment, construction contracts,
and utility contracts. Local vendor preference shall be three percent (3%) of the annual value of
the award. The term local vendor is defined as a gradually increasing range with preference
assigned as follows:
Rule 1: Vendor located within the city limits of the City of Dover.
Rule 2: Vendor located within Kent County, Delaware (applicable only if no vendor
qualifies under rule 1)
4
Paj 5
Item 1.
Rule 3: Vendor located within the State of Delaware (applicable only if no vendor
qualifies under rules 1 & 2)
In the event that no vendor qualifies under rules 1, 2, or 3, no local vendor preference will be
awarded. The vendor must identify qualification and claim to the preference on the
submitted bid documents. This preference is to be considered as stand‐alone and cannot be
added to any other preference that may be allowed.
A bid bond or certified check in the amount equivalent to ten percent (10%) of the proposal
amount shall be required with each proposal. Acceptable bid security shall be limited to a bid
bond in a form satisfactory to the City underwritten by a company licensed to issue bid bonds in
this state or a bank certified check. If a bid does not comply with security requirements, it shall be
rejected as being non‐responsive. The check or bid bond of the bidder to whom the contract is
awarded will be forfeited to the City of Dover as liquidated damages in case the contract and
performance bond are not executed within fifteen days after receiving official notification of
award.
A performance bond shall be required from the successful bidder for a construction contract. Such
a bond shall be for the full amount of the contract. If the contractor fails to provide such a bond or
a binder within fifteen days of the award of the contract, the award of the contract or the contract
shall be void. The bond shall be released by the City of Dover upon successful completion of the
contract and upon a detailed inspection of the contracted work.
In the event the contractor does not fulfill its obligations under the terms and conditions of this
contract, the City of Dover may contract for an equivalent product on the open market. Any
difference in cost between the contract prices herein and the price of open market product shall be
the responsibility of the contractor. Under no circumstances shall monies be due the contractor in
the event open market products can be obtained below contract cost. Any monies charged to the
contractor may be deducted from an open invoice.
Neither the contractor nor the City of Dover shall be held liable for non‐performance under the
terms and conditions of this contract due but not limited to, government restriction, strike, flood,
fire, or unforeseen catastrophe beyond either party's control. Each party shall notify the other in
writing of any situation that may prevent performance under the terms and conditions of this
contract.
Vendors must provide references to the City of Dover upon request. Vendor references may be
checked to verify the bidder’s ability to perform the contract requirements, the quality of work,
and the ability to meet obligations.
ENVELOPES MUST BE MARKED “DEMOLITION OF A THREE‐STORY COMMERCIAL STRUCTURE
WITH BASEMENT LOCATED AT 235‐239 WEST LOOCKERMAN STREET, BID NUMBER 23‐
0003PI.” No faxed or emailed bids will be accepted.
5
Paj 6
Item 1.
The City of Dover shall have the right to reject any or all bids if deemed to be in the best
interest of the City, such as but not limited to local vendor preference and minority vendor
preference while awarding.
Sincerely,
Barry Wolfgang
Contract and Procurement Manager
City of Dover
(302) 736‐7795
www.cityofdover.com
6
Paj 7
Item 1.
City of Dover
INTENT TO BID NOTICE
23-0003PI
ITB Number: ________________________ October 26, 2022 @ 2:00 P.M.
ITB Opening: __________________________
Description: __________________________________________________________________
Demolition of 235-239 West Loockerman Street, Dover Delaware
If you are interested in the Intent to Bid described above, you can download it in Adobe PDF
format from our web site http://www.cityofdover.com/bid-procurement. Any amendments or
other additional information related to this solicitation will be posted with the original
document on the web site.
If you do not have internet access and want to receive this Intent to Bid, all subsequent
amendments, or additional information on the bid package, please provide the requested
information to:
The City of Dover
Purchasing Office
710 William Street
Dover, DE 19904
Fax: (302) 736-7178, attention Procurement Manager
E-mail: doverwhse@dover.de.us
Please complete the following and return this form to the City of Dover Purchasing Office.
Company: Vendor Response /Request
No submission at this time, please retain on
Address: vendor list
Please send complete bid package
Contact: I will download the bid package
Phone: I intend to submit
Email: I do not intend to submit
Other:
7
Paj 8
Item 1.
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
THREE-STORY COMMERCIAL STRUCTURE WITH BASEMENT DEMOLITION
235-239 WEST LOOCKERMAN STREET
DOVER DE 19904
ITB #23-0003PI
CITY OF DOVER
P O BOX 475
DOVER, DE 19903
8
Paj 9
Item 1.
CONTENTS
THREE-STORY COMMERCIAL STRUCTURE WITH BASEMENT DEMOLITION
235-239 WEST LOOCKERMAN STREET
CITY OF DOVER
BID NO. 23-0003PI
SECTION 1 - PROJECT SPECIFICATIONS PAGE
1.0 Scope of Services 3
1.1 Description of Work 3
1.2 Contractors Plan 3
1.3 Condition of Structure 4
1.4 Protection 4
1.5 Damages 4
1.6 Traffic 4
1.7 Pollution Controls 5
1.8 Building Demolition 5
1.9 Fill 6
1.10 Statement of Qualifications 7
SECTION 2 – QUALIFICATIONS
2.0 Qualifications of Candidates 7
2.1 Obligations of the Candidate 8
2.2 Liquidated Damages 8
2.3 Criteria for Award 8
2.4 Time Provisions 8
2.5 Assignment of Contract 8
2.6 Indemnification 8
2.7 Building Permits 8
2.8 Insurance Coverage 8
SIGNATURE SHEET 9
BID SHEET 10
BIDDER’S CHECK LIST 10
2
9
Paj 10
Item 1.
BID #23-0003PI
SECTION 1 - PROJECT SPECIFICATIONS
1.0 SCOPE OF SERVICES
The City of Dover is seeking a qualified and competent contractor to demolish and remove a three-story
commercial structure with a basement, all junk, debris, litter, fences, or other materials located at 235-239 West
Loockerman Street, Dover, DE. Per the City of Dover Code of Ordinances, Part II, Chapter 22, Article XI,
Section 22-381, Dangerous Buildings Ordinance, the Dover City Council has determined this property to be a
dangerous dwelling and all structures must be taken down and completely removed. The following information
should be of assistance in developing a bid. If you have any questions, please contact Mr. Barry Wolfgang,
Contract and Procurement Manager at (302) 736-7795. All technical questions must be emailed to
doverwhse@dover.de.us.
1.1 DESCRIPTION OF WORK
1.1.1 Demolition work requires removal and disposal off-site of the following:
1.1.2 Three story commercial structure, including all items inside.
1.1.3 Building footing area is to be backfilled with clean fill dirt, compacted, graded, and seeded after all basement
walls and footers have been removed.
1.1.4 Disconnect water, sewer, electric and telephone services. An inspection of the capped sewer line which
must performed above grade must be made by a City of Dover Building Inspector.
1.1.5 A demolition permit is to be obtained from the City prior to any work being done on the property . There
will be no charge for the permit. A final inspection will be performed by a Building Inspector.
1.1.6 Any salvageable items of value left after the owner has removed what he/she wants in the building(s) shall
then become the property of the Contractor.
1.1.7 Storage or sale on-site of removed salvageable items will not be permitted.
1.1.8 The use of explosives will not be permitted.
1.1.9 All asbestos containing material, if any, will be removed from the structure(s) by a separate contract
prior to and during the demolition of the structure(s). Demolition Contractor will be required to
work with the asbestos abatement contractor.
1.2 CONTRACTORS PLAN
1.2.1 Contractor shall include with their bid, a brief narrative description of how they plan to complete the project.
The plan shall include the technique that will be used to demolish the building(s), as well as the equipment
that will be used to demolish the buildings and haul them away.
3
10
Paj 11
Item 1.
1.3 CONDITION OF STRUCTURES
1.3.1 The City assumes no responsibility for actual condition of structures to be demolished.
1.4 PROTECTION
1.4.1 Provide passageways around the areas of demolition to ensure safe passage of persons in the area.
1.4.2 No part of the buildings may be left in an unsafe condition. If any danger is imminent, the contractor shall
rope off or place barricades around the area.
1.4.3 Protect existing trees and vegetation adjacent to the demolition areas. With written permission of the City,
some vegetation may be removed to facilitate demolition of the house, if necessary.
1.5 DAMAGES
1.5.1 Should adjacent property be damaged in any manner, the Contractor shall stop work immediately and
contact Mr. Eddie Kopp, Code Enforcement Supervisor, (302) 736-7010.
1.5.2 Contractor shall promptly repair damages caused to adjacent facilities, property, streets, and sidewalks by
demolition operations as directed by the City and at no cost to the City.
1.6 TRAFFIC
1.6.1 Conduct demolition operations and the removal of debris to ensure minimum interference with roads, streets,
walks, and other adjacent occupied or used facilities. Loockerman Street and South New Street will
need to be closed during demolition. This closure will need to be coordinated with Dover Police
Department and the Delaware Department of Transportation.
1.6.2 Do not close or obstruct streets, walks, or other occupied or used facilities without permission from
authorities having jurisdiction (Dover Police Department & DelDOT). Provide alternate routes around
closed or obstructed traffic ways, if required by governing regulations.
1.6.3 The contractor shall maintain traffic in the project area to the satisfaction of the applicable local regulatory
agencies, the local public agency, and the City. Unless otherwise specified within the Contract Documents,
the Contractor must maintain pedestrian and vehicular traffic. It shall be the sole responsibility of the
Contractor to keep the local regulatory agencies, (including but not limited to, the Police and Fire
Departments) notified at least 72 hours in advance of changes in traffic patterns. The Contractor shall
supply, install, maintain, adjust, move, relocate and store all signs, suitably lighted barricades, sidewalk
sheds, traffic cones, warning lights and traffic delineators, as necessary to carry out the traffic routing plan
and maintain vehicular and pedestrian traffic, to keep people, animals, and vehicles from excavations,
obstacles, etc.
1.6.4 Signs shall be adequate from the regulation safety and convenience of traffic and pedestrians. The
Contractor may be required to employ certified flagger(s) and take other such reasonable means or
precautions as required to prevent damage or injury to other property, and to minimize to public nuisance
by construction operations.
1.6.5 The Contractor shall observe and obey all local and state laws, ordinances, regulations, and permits in
relation to the obstruction of a street, keeping passageways open and protecting pedestrians.
4
11
Paj 12
Item 1.
1.6.6 Suitably lighted barriers or barricades shall be furnished by the Contractor and put up and maintained at
all times, during the night and daytime, around all open ditches, trenches, pedestrian walkways,
excavations, or other work potentially dangerous to pedestrians. Such barricades shall be securely
constructed, supported, and braced at least 3 feet high above the ground. Barricades shall be placed on all
sides and throughout the entire length and of all open ditches, trenches, excavations, or other work, which
must be barred to the general public. Barricades shall be properly painted to the satisfaction of the owner
in order to retain a high degree of visibility to vehicular and pedestrian traffic.
1.6.7 Should the contractor or his employees neglect to set out and maintain barricades or lights, as required in
these specifications, the City immediately and without notice, may furnish, install, and maintain barricades
or lights. The cost thereof shall be borne by the contractor and may be deducted from any amount due or
to become due to the contractor under this contract.
1.6.8 The contractor will be held responsible for any damages that the local public agency, owner, their heirs or
assigns may have to pay as consequence of the contractor’s failure to protect the public from injury, and
the same may be deducted from any payments that are due, or may become due, to the contractor under
this contract.
1.6.9 Provide a traffic director and certified flagger(s) as required by the local regulatory agencies.
1.7 POLLUTION CONTROLS
1.7.1 Use of water sprinkling, temporary enclosures, and other suitable methods as necessary to limit the amount
of dust and dirt rising and scattering in the air, to the lowest level of air pollution practical for the condition
of work. Comply with the governing Clean Air regulations. Do not use water where it may create
hazardous or objectionable conditions such as pollution, ice, or flooding.
1.7.2 Clean adjacent improvements including walks and streets of all dust, dirt and debris caused by demolition
operations, as directed by governing authorities. Return adjacent areas to condition existing prior to the
start of the work.
1.8 BUILDING DEMOLITION
1.8.1 Demolish the building(s) completely and remove all debris and rubble from the site. Use such methods as
required to complete the work within the limitations of governing regulations.
1.8.2 Proceed with demolition in a systematic manner from the top of the structure to the ground and from the
rear to the front of the structure(s). Complete demolition work above each floor or tier before disturbing
any of the supporting members on the lower levels.
1.8.3 Demolish concrete and masonry in small sections.
1.8.4 Remove structural framing members and lower to ground, by means of hoists, derricks, or other suitable
methods.
1.8.5 Locate demolition equipment throughout the structure and remove materials so as to not impose excessive
loads to supporting walls, floors or framing.
5
12
Paj 13
Item 1.
1.8.6 Demolish basement/foundations, other waits, and footings. Remove basement access in sidewalk on South
New Street and replace with fill material and City approved sidewalk.
1.8.7 The use of swinging weight, clamshell bucket, power shovel, bulldozer or other mechanical contrivance for
the purpose of demolition shall be permitted.
1.8.8 Where a swinging weight or other mechanical contrivance is used, a protected zone of demolition at least
one and one-half times the height of the structure or portion thereof being so demolished shall be
maintained around the points of impact. The supporting cables shall be of such length or shall be so
restrained that it is not possible for the weight to swing against any structure other than the structure being
demolished.
1.8.9 Where a clamshell bucket is being used, a safety zone shall be maintained within 25 feet of the line of
travel of the bucket.
1.8.10 No materials shall be dropped to any point lying outside the exterior walls of the structure unless the area
is effectively protected.
1.8.11 Columns, beams and other structural members which are being dismembered shall not be under any stress
other than their own weight during removal and shall be chained or lashed in place to prevent any
uncontrolled swinging or dropping. Large structural members shall not be thrown or dropped but shall be
carefully lowered from the building.
1.8.12 All rubbish and debris shall be kept thoroughly wetted down to prevent dust and dirt from rising or
spreading.
1.8.13 Burning on-site will not be permitted.
1.8.14 Blasting will not be permitted on the project site.
1.8.15 Upon completion of all demolition work, the contractor shall repair any streets, sidewalks, or other features
scheduled to remain, that have been damaged due to this demolition, to a condition equal to or better than
their preexisting conditions. Materials used for repair shall be of like kind and of the thickness, width,
length, etc. as the original, except that, asphalt may be used to replace concrete only if so ordered by the
City and/or the local authorities.
1.8.16 The contractor shall be responsible for the protection and preservation of all municipal and public utilities
traversing the project site, the protection of manholes and manhole covers, valve boxes and other devices
serving buildings in the area and shall pay all costs of repair in the event of damage caused by his work.
1.8.17 The contractor shall not remove barricades until approval to do so is granted by the City.
1.9 FILL
Provide all fill necessary to bring the existing grades under the demolished building to be level with the adjacent
present grades. Fill to be compacted in 6-12” lifts and left clean. Material shall be clean, well-graded sand and
gravel, free of organic matter, rubble, frost and all deleterious substance. Fill shall contain no rocks over 4” in
the greatest dimension. Fill shall be compacted in lifts no greater than 12 inches per lift.
6
13
Paj 14
Item 1.
1.10 STATEMENT OF QUALIFICATIONS
Please answer the following questions regarding your company’s past performance on similar projects. Attach a
financial statement or other supportive documentation. Failure to reply to this instruction may be regarded as
justification for rejecting a bid.
A. Number of years in business: __________________________________________
B. Number of personnel employed:
Part time _______________________________________
Full time _______________________________________
C. List three contracts of this type/size your firm completed within the last three years:
Project Date Contact Person Phone No.
D. SUBCONTRACTORS: If subcontractors are to be used, please list firm name, address, name of
principal, and phone number below or on a separate sheet. Also indicate portion or section of work
subcontractor will be performing.
Company name Address Principal Phone
Additional information may be requested subsequent to your responding to this bid request.
2.0 QUALIFICATIONS OF CANDIDATES:
The City may make such investigations as deemed necessary to determine the ability of the candidate to perform
the work and the degree to which any candidate meets the criteria for award listed herein.
7
14
Paj 15
Item 1.
2.1 OBLIGATIONS OF THE CANDIDATE:
At the time of the opening of bids, each candidate will be presumed to be thoroughly familiar with the
specifications, the various sites, the City's requirements, and the objectives for each element of the project item
or service.
2.2 LIQUIDATED DAMAGES:
Liquidated damages for late completion will be $500.00 per day.
2.3 CRITERIA FOR AWARD:
This Intent to Bid does not necessarily contemplate an award based solely on price. Rather, the City reserves its
rights to reject any or all bids or any portion thereof that may determine to be the best value and overall contract.
2.4 TIME PROVISIONS:
The content of any bid submitted is to remain valid and available to the City for ninety (90) days from the day
bids are due.
2.5 ASSIGNMENT OF CONTRACT:
The successful candidate agrees that he will not assign, transfer, or subcontract any portion of the award, unless
indicated.
2.6 INDEMNIFICATION:
Contractor shall not assert any claim arising out of any act or omission by any agent, officer or employee of the
City in the execution or performance of this Agreement against any such agent, officer or employee.
The contractor expressly agrees to at all times indemnify, defend and save harmless the City of Dover and its
respective officers, agents, and employees on account of any and all demands, claims, damages, losses, litigation,
financial costs and expenses, including counsel's fees, and compensation arising out of personal injuries
(including death), any damage to property, real or personal and any other loss, expense or aggrievement directly
or indirectly arising out of, related to or in connection with the project and the work to be performed hereunder
by the contractor, its employees, agents, subcontractors, material suppliers, or anyone directly or indirectly
employed by any of them. The contractor shall and does hereby assume and agree to pay for the defense of all
such claims, demands, suits, proceedings and litigation. The provisions of this paragraph shall survive the
expiration or early termination of this agreement and shall not be limited by reason of any insurance coverage.
2.7 BUILDING PERMIT FEES:
The contractor is responsible to obtain demolition permits at no cost.
2.8 INSURANCE COVERAGE:
The contractor must submit a certificate of insurance coverage which identifies the limits of specific
coverage for the business with their bid submission.
8
15
Paj 16
Item 1.
CITY OF DOVER BID NO. 23-0003PI
SIGNATURE SHEET
To the City Contract and Procurement Manager
Dover, Delaware
This certifies that the undersigned has examined the location of:
Three-Story Commercial Structure with Basement Demolition
235-239 West Loockerman Street
Dover DE 19901
and hereby declares that they have carefully examined the specifications and project site and has satisfied
themselves as to all the quantities and conditions and understands that in signing this bid they waive all rights to
plead any misunderstanding regarding the same.
The undersigned further understands and agrees that they will furnish and provide all the necessary material,
machinery, implements, tools, labor, services, and other items of whatever nature, and to do and perform all the
work necessary under the aforesaid conditions, to carry out the contract and to accept in full compensation
therefore the amount of the contract as agreed to by the contractor and the City.
NOTE: Unit prices for all items, all extensions, and total amount of bid, shall be shown, and be written in ink or
typed. Show unit prices in figures only. Figures written to the right of the dot (decimal) in the dollars column
shall be considered as cents.
The bidder is hereby advised that by signature of this bid they are deemed to have acknowledged all requirements
and signed all certificates contained herein.
** Receipt is hereby acknowledged of addendum(s) No. (s) _______________ , _______________ &
______________
SIGNATURE OF AUTHORIZED OFFICIAL(s)
_______________________ ______________________
_____________________________ ________________
FIRM NAME _______________ ___________________
(ADDRESS) _____________________ _____________
TELEPHONE NUMBER
EMAIL ADDRESS
9
16
Paj 17
Item 1.
BID SHEET
Three-Story Commercial Structure with Basement Demolition
CITY OF DOVER BID NO. 23-0003PI
THE CITY OF DOVER RESERVES THE RIGHT TO AWARD THIS CONTRACT BASED ON
WHICH BID IS MOST ADVANTAGEOUS TO THE CITY.
ITEM DESCRIPTION QTY UNIT DOLLAR
NO. AMOUNT
1. LUMP SUM BID FOR COMPLETE DEMOLITION 1 LS $
AND REMOVAL OF THE THREE-STORY
COMMERCIAL STRUCTURE, BASEMENT, ALL
JUNK, DEBRIS, LITTER FENCES, & VEGETATIVE
OVERGROWTH AT 235-239 LOOCKERMAN STREET
Local Vendor Preference (Circle one):
Rule 1 Rule 2 Rule 3 None
Minority Vendor Preference (Circle one):
Yes No
I SHALL BEGIN WORK WITHIN FOURTEEN (14) DAYS AFTER NOTICE TO PROCEED IS
RECEIVED AND COMPLETE WORK WITHIN THIRTY (30) DAYS.
BIDDER’S CHECK LIST
The bidder’s attention is especially called to the following items:
A. SIGNATURE SHEET
To be filled in and signed by the bidder and returned with the bid.
B. BID SHEET
The unit prices, extensions and total amounts bid must be shown in the spaces provided and returned
with the bid.
C. CONTRACTOR’S PLAN (not a form)
As stated on Page 3, paragraph 1.2, Contractor shall include with their bid, a brief description of how they
plan to complete the project. The plan shall include the technique that will be used to demolish the
building(s), as well as the equipment that will be used to demolish the building(s) and haul it away.
D. STATEMENT OF QUALIFICATIONS
To be filled in and returned with the bid.
E. CERTIFICATE OF INSURANCE
A copy of the contractor(s) insurance coverage must be included in the submission.
Note: There may be a large amount of unclaimed debris inside of the house. All demolition costs must
include the disposal of this material.
10
17
Paj 18
Item 1.
PRE-DEMOLITION CONDITION ASSESSMENT REPORT
FOR
237 AND 239 WEST LOOCKERMAN STREET
DOVER, DELAWARE
September 2022
Prepared For
THE CITY OF DOVER, DELAWARE
Prepared By
550 S. BAY ROAD, DOVER, DELAWARE 19901 (302)734-9188
18
Paj 19
Item 1.
CONTENTS
I. EXECUTIVE SUMMARY .......................................................................................................................... 1
II. PURPOSE AND SCOPE ........................................................................................................................... 1
A. General Description .......................................................................................................................... 2
B. Documents Reviewed ....................................................................................................................... 2
C. Limiting Considerations .................................................................................................................... 2
III. OBSERVATIONS ................................................................................................................................. 2
A. Building Construction:....................................................................................................................... 2
B. Hazards: ............................................................................................................................................ 2
C. General Structural Condition: ........................................................................................................... 3
IV. DEMOLITION RECOMMENDATIONS ................................................................................................. 4
Photo Logs: 5
I. EXECUTIVE SUMMARY
Century Engineering, LLC, (Century) performed a site observation of the buildings at 237 and 239 West
Loockerman Street, Dover Delaware on September 13, 2022. This building experienced a fire in March
2022 and sustained significant structural fire damage in the southwest portion of the structure, and water
damage throughout the rest of the building. Now condemned, the building is to be demolished.
The purpose of the site visit was to evaluate the structural integrity of the damaged building and identify
areas of concern that could compromise or damage the adjacent building at 231 West Loockerman Street,
which was not damaged during the fire and is to remain in place.
Buildings 237/239 are constructed as one building with common exterior walls and commercial façade
facing Loockerman Street. It was determined that 237/239 are not directly in contact with 231 and have
a physical gap of approximately 4-inches separating the two buildings.
II. PURPOSE AND SCOPE
The pre-demolition structural condition assessment is performed to better understand the present
condition of the building and confirm that demolition activities may be performed safely, and that the
chances of unplanned collapse are minimized. The report has been prepared in accordance with EM-385-
1-1, USACE Safety and Health manual, 30 November 2014. This report is based on the observations or
Walter J. Hoey, P.E., and Richard A. Beard, P.E., Senior Structural Engineer.
19
Paj 20
Item 1.
City of Dover
Pre-Demolition Structural Condition Assessment
237 and 239 West Loockerman Street
A. General Description
Our inspection is a “walk-through” visual-type assessment performed by qualified personnel. No
material testing (destructive or otherwise) or calculations were performed to determine the
adequacy of the original design. Our Structural Condition Assessment is intended to be a general,
overall “snapshot” of the building on the date the inspection was performed. It will not be a
technically exhaustive or detailed evaluation of existing conditions.
B. Documents Reviewed
There were no record drawings provided or reviewed for this building.
C. Limiting Considerations
Century has performed a visual inspection of the building included in this report. As stated, no
demolition or exposure of covered structural elements was performed. Hidden or latent
unobserved conditions may exist that cannot be seen or included in this report. Photographs
provided are to show general conditions. HAZMAT (asbestos, etc.) investigations shall be by
others and are not specifically covered by this report.
Hazards noted in this report are visual observations and may not be all inclusive.
III. OBSERVATIONS
A. Building Construction:
The building is a constructed as one structure with a central demising wall running the length and
height of buildings 237/239 in a north south orientation, perpendicular to Loockerman Street.
The exterior walls and the demising wall are load bearing brick masonry supporting steel and
timber girders placed in an east west orientation. Timber floor joists, supported by the masonry
walls and girders, run in a north south direction for the first, second, and third floors and for the
third floor ceilings. Roof construction consists of timber trusses placed in an east west direction
and supported by the exterior and demising walls. Both 237 and 239 have a full basement with
both interior and exterior access.
B. Hazards:
Several hazards that may impact demolition operations were noted:
The floors in some areas are covered with thick debris preventing the identification of
holes or weak spots in the flooring.
Evidence of mold was noted in the basement.
The top portion of the west masonry wall is unsupported at areas where the roof trusses
have been destroyed by the fire. Without the lateral support of the roof, this section of
wall has the potential to fall to the sidewalk below under strong winds or from settlement
within the building.
Water damage has caused ceiling tiles and plaster to fall on the floors.
The brick masonry chimney on the north side of the building contains large longitudinal
cracks on two sides and has the potential to fall.
Page |2 20
Paj 21
Item 1.
City of Dover
Pre-Demolition Structural Condition Assessment
237 and 239 West Loockerman Street
Hazardous materials cannot be segregated due to the partial collapse of portions of the
building and the fire and water damage throughout.
C. General Structural Condition:
Overall, the power has been turned off to both buildings. However, at the time of this site visit,
the power had not been disconnected. Water is still on and running out of damaged hot-water
radiators in Building 237. The city is working to get the water turned off at the main water valve(s)
on Loockerman and Queen Streets. Natural gas has been turned off to the building. However,
the gas lines and meters are still connected at the rear of the building.
Building 239:
Fire damage is primarily contained to the southern section of the structure and extends from the
first floor through the roof, compromising all elements. Floors have been weakened by fire
damage and from water saturation. Portions of floors are missing, especially at the southeast
corner of the structure. Second floor joists display severe charring and section loss toward the
front of the building.
The roof has suffered significant fire damage and burned through in numerous locations. Roof
joists have been compromised or completely destroyed in some areas. Access to the roof was
not possible at the time of this site visit.
Brick masonry foundation walls are visible in the basement. These walls appear sound and
undamaged from the fire and water. However, mold is visible throughout the basement, including
black mold on the walls and ceilings and an unknown white mold resembling cotton candy hanging
from the first floor joists.
The brick chimney located on the exterior of the rear (north) wall contains large vertical cracks on
the east and west sides. These cracks extend from the first floor to the top of the chimney. This
element presents a hazard to the existing undamaged building to remain located just to the north
of building 239.
Building 237:
Extensive water damage is noted in building 237. Floors are covered with ceiling tiles and other
ceiling construction having failed from being saturated with water. The majority of the damage
appears to be smoke damage on the first floor and some minor fire damage to the ceiling in the
front room.
Page |3 21
Paj 22
Item 1.
City of Dover
Pre-Demolition Structural Condition Assessment
237 and 239 West Loockerman Street
IV. DEMOLITION RECOMMENDATIONS
Considering buildings 237/239 are not attached to any of the adjacent buildings, it appears that
demolition of the fire damaged buildings can be performed with some precautions.
Demolition methods should consider the use of a backhoe type equipment with a claw
attachment. This equipment should be positioned on Queen Street, pulling down the building
from west to east.
The contractor should consider installing cables between the east and west exterior walls of the
building to prevent unintentional or sudden collapse of the building, to control the demolition of
the walls and to avoid movement toward structures to remain.
The damaged chimney on the north end of the building should be carefully demolished to prevent
the structure from falling on the building directly to the north.
Care should be exercised with removal of the easterly wall adjacent to building 231 to ensure it
does not collapse or kick back to the east during removal of the floor joists or the wall itself.
Foundation walls should be removed with care following the removal of floor joists and girders.
Temporary bracing is recommended to prevent their unintentional failures. We recommend the
foundation walls be removed to 1-foot below finished grade and the area backfilled to finished
grade.
The basement floors should be broken up to allow drainage prior to backfilling. The basement
doors within the sidewalk should be removed, the utility well backfilled, and the surface finished
with a concrete sidewalk to match the surrounding sidewalk.
All basement areas should be backfilled with clean fill as soon as possible to prevent collapse of
the adjacent areas. This operation should be performed whether the foundation walls are
removed or not. Temporary shoring may be required to maintain the integrity of the surrounding
sidewalks and buildings.
Heavy loads, such as dumpsters and vehicles, should not be allowed on the sidewalks to prevent
additional lateral loads on the foundation walls, especially as demolition progresses.
The east brick foundation wall is anticipated to be a separate structure from building 231.
However, the footings of two buildings may be in contact or cast together. Additionally, the two
foundation walls may have some shared elements that will only be revealed during demolition.
It is recommended to have a structural engineer on site during demolition to observe the progress
and ensure the operation is not compromising the buildings to remain.
Page |4 22
Paj 23
City of Dover
Item 1.
Pre-Demolition Structural Condition Assessment
237 and 239 West Loockerman Street
Photo #1 – South Elevation facing West Loockerman Street
Photo #2 – West Elevation facing South New Street
Page |5 23
Paj 24
City of Dover
Item 1.
Pre-Demolition Structural Condition Assessment
237 and 239 West Loockerman Street
Photo #3 and #4 – Separation Between Adjacent Building on West Loockerman Street
Page |6 24
Paj 25
City of Dover
Item 1.
Pre-Demolition Structural Condition Assessment
237 and 239 West Loockerman Street
Photo #5 - Rear Alley Looking East Photo #6 - Rear Alley Looking West
Page |7 25
Paj 26
City of Dover
Item 1.
Pre-Demolition Structural Condition Assessment
237 and 239 West Loockerman Street
Photo #7 - Rear Basement Access to Building 237
Photos #8 – Rear Alley looking East
Page |8 26
Paj 27
City of Dover
Item 1.
Pre-Demolition Structural Condition Assessment
237 and 239 West Loockerman Street
Photo #9 - Building 239 - First Floor
Photo #10 – Building 239, Second Floor Joists Severely Burned
Page |9 27
Paj 28
City of Dover
Item 1.
Pre-Demolition Structural Condition Assessment
237 and 239 West Loockerman Street
Photo #11 – Third Floor Fire Damage
Photon #12 – Third Floor Ceiling and Roof Damage
P a g e | 10 28
Paj 29
City of Dover
Item 1.
Pre-Demolition Structural Condition Assessment
237 and 239 West Loockerman Street
Photo #13 – Roof Rafters Burned Through – Roof Open to Daylight
Photo #14 - Mold Growing on Walls in Basement
P a g e | 11 29
Paj 30
City of Dover
Item 1.
Pre-Demolition Structural Condition Assessment
237 and 239 West Loockerman Street
Photo #15 - Mold Growing on Ceiling in Basement
Photo #16 - Building 237 – First Floor
P a g e | 12 30
Paj 31
City of Dover
Item 1.
Pre-Demolition Structural Condition Assessment
237 and 239 West Loockerman Street
Photo #17 - Building 237 – Lower Level
Photo #18 - Building 237 – Basement with Mold on Walls
P a g e | 13 31
Paj 32
City of Dover
Item 1.
Pre-Demolition Structural Condition Assessment
237 and 239 West Loockerman Street
Photo #19 - Building 237 – Second Floor Gas Hot-Water Furnace in Mechanical Closet
(Similar Gas Hot-Water Furnace on Third Floor)
P a g e | 14 32
Paj 33
Item 1.
23-0003PI Questions
FAD Management
1. Just so we are clear, there has been no asbestos survey or abatement done and that is the
responsibility of the winning bidder?
The City of Dover will be paying for a separate contract for asbestos abatement. The
winning bidder will be required to work with the asbestos abatement contractor during
the demolition work.
FAD Management
1. Just so we are clear, there has been no asbestos survey or abatement done and that is the
responsibility of the winning bidder?
The City of Dover will be paying for a separate contract for asbestos abatement. The
winning bidder will be required to work with the asbestos abatement contractor during
the demolition work.
Design Contracting
1. What is the schedule for demolition?
Demolition would start as soon as the bid is approved by council. We intent to act quickly after
receiving the bids back to get the approval. The city wants the building demolished before the
freezing temperatures begin.
2. Are footings and foundations to remain or be removed? Does the basement floor get
removed?
As much of the footings and foundation should be removed if safe to do so. The basement should
be removed if safe to do so and it doesn’t affect the adjacent buildings.
3. Do you have specs for backfill?
This should be included in the bid.
4. How do you want to leave the site after demolition? Topsoil & seed or stone for parking?
Graded with topsoil and seed.
5. Any permanent fence after final grading?
33
Paj 34
Item 1.
No fence is required
F.R. Beinke
1. The sidewalk panels along the wall on both streets will need to be replaced when the
basement walls are removed.
All sidewalks will need to be in a like or better condition at the time of demolition. Any
damaged or removed sidewalk will need to be replaced.
2. The brick sidewalk at the corner of the building nearest the intersection will have to be
removed and reset after the basement walls are removed.
This is in the historic district all brick associated with the sidewalk will need to be replaced with
the same brick that was removed.
3. The footer along the party wall can remain so as to avoid undermining the wall of the
adjacent building.
The footer should be removed according to the recommendation from the engineering report
attached to the bid.
4. Please define whether the abatement or the demo contractor removes the Universal
Wastes such as refrigerants.
The demolition contractor will be responsible for universal waste. Asbestos will be removed
from a separate contractor hired by the city.
5. Please confirm that the City will remove, store and re-install the street light and horse tie
on New Street.
The street light removal can be requested prior to demolition.
34
Paj 35
City of Dover
Item 1.
Sealed Bid Tabulation
ITB Number: 23-0003PI ITB Due Date: October 26, 2022 @ 2:00 PM
ITB Title: Demolition of 235-239 West Loockerman Street, Dover, DE
Vendor Name Price Bid Comments
Signature sheet included: YES
Dependable Construction
Quote sheet included: YES
William Holley $112,250.00
Contractor’s plan included: YES
300 Cornell Drive, Suite A-2 Minus 3%=
Statement of qualifications included: YES
Wilmington, DE 19801 $108,882.50
Insurance Certificate Included: NO BID BOND
302-421-9152
Local/Minority vendor preference: MINORITY
Signature sheet included: YES
Design Contracting
Quote sheet included: YES
Andrew Diffley $159,000.00
Contractor’s plan included: YES
PO Box 25125 Minus 3%=
Statement of qualifications included: YES
Wilmington, DE 19899 $154,230.00
Insurance Certificate/Bid Bond Included: YES
302-429-6900
Local/Minority vendor preference: MINORITY
Signature sheet included: YES
Gateway Construction, Inc.
Quote sheet included: YES
Mark Kohout $320,000.00
Contractor’s plan included: YES
3527 Forrest Ave MINUS 3%=
Statement of qualifications included: YES
Dover, DE 19904 $310,400.00
Insurance Certificate/Bid Bond Included: YES
302-672-7942
Local/Minority vendor preference: LOCAL RULE 2
Signature sheet included: YES
Sunnyfield Contractor’s
Quote sheet included: YES
John Bartsch $164,900.00
Contractor’s plan included: YES
150 Sunnyfield Lane MINUS 3%=
Statement of qualifications included: YES
Dover, DE 19904 $159,953.00
Insurance Certificate/Bid Bond Included: YES
302-674-8610
Local/Minority vendor preference: LOCAL RULE 2
Signature sheet included:
Quote sheet included:
Contractor’s plan included:
Statement of qualifications included:
Insurance Certificate/Bid Bond Included:
Local/Minority vendor preference:
Signature sheet included:
Quote sheet included:
Contractor’s plan included:
Statement of qualifications included:
Insurance Certificate/Bid Bond Included:
Local/Minority vendor preference:
Awarded by City Council to:
1
35
Paj 36
Item 1.
36
Paj 37
Item 1.
37
Paj 38
Item 1.
38
Paj 39
Item 1.
39
Paj 40
Item 1.
40
Paj 41
Item 1.
41
Paj 42
Item 1.
42
Paj 43
Item 1.
43
Paj 44
Item 1.
44