EXHIBIT #1 COUNCIL MINUTES 05/12/2008 2008 STATE OF THE CITY Carleton E Carey, Sr. Mayor

Paj 2

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 City of Dover Vision The City of Dover is a place where people want to live! Through the team effort of its elected officials, employees, and citizens, Dover is a clean and safe community with a future of balanced growth and opportunity where all h citizens are heard, enjoy a high quality of life, and diversity is valued.

Paj 3

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Overall Quality of Life When asked to rate the overall quality of life in Dover, 55% of respondents thought it was “Good” and 12% thought it was Excellent “Excellent”. *Good rating increased 6% and Fair decreased by 6 from 2006 Citizen Survey Source: 2007 Citizen Survey Results

Paj 4

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Overall Quality of Service Provided The overall quality of service provided by the City of Dover was rated 60 on 100 point scale in 2007, compared to 60 in 2006, and 61 in 2005. Source: 2007 Citizen Survey Results

Paj 5

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 City p Population Growth 35,500 35,197 35,000 34,500 34,079 34,000 33,858 33,500 33,434 33,000 32,500 2004 2005 2006 2007 * Source: DE Population Consortium Estimate 2007

Paj 6

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Taxable Property Values Beginning Fiscal VALUE: Year 2008 $2,900,227,275 (July 1, 2007) % of change: 8.451% from last year Value Change: Please note: $245,084,275 This does not include (Value change is the increase in value Senior Citizen Discount from last year) o

Paj 7

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 City Budget Fiscal Year 2008-09 Draft Budget Figures: $158 Million (excludes intrafund tranfers and current year balance) Increase of only 3% over last years budget

Paj 8

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Business Licenses 2007 Total: 4,734 2006 Total: 4,574 Increase of 160 Business Licenses Issued Construction Permits Issued 2007 Total: 2752 2006 Total: 2637

Paj 9

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 New Construction 966 New Site Plan pp Applications for Review in 2007 • Applications for commercial construction or rehabilitation • Office buildings • Apartment/condominium units • Governmental or ll college • Hotels

Paj 10

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 2007 Planning Commission Approvals 9Retail 442,431 Square Feet (Inclusive of Eden Hill Commercial District) 9Institutional 128,676 Square Feet q 9Hospitality 1,730,051 Square Feet (Inclusive of Dover Downs Video Expansion) 9Industrial 84,552 Square Feet 9Office 166,205 Square Feet 9Residential 832 New Housing Units

Paj 11

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Construction Value 2007 Total: $135.8 Million Dollars 2006 Total: $96.2 Million Dollars 2005 Total: $71 Million Dollars 2004 Total: $59.7 Million Dollars

Paj 12

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Construction Projects

Paj 13

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Total Complaints Violent Crime Five Year Comparison Five Year Comparison Actual Drug Arrests Drugs, Vice, & Organized Crime Section

Paj 14

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Police Department 9 Special Operations Support Team (S.O.R.T.) S.O.R.T. consists of 14 veteran officers who are only considered for this assignment upon completion of extensive physical training. During 2007 the motivated team completed more than 140 hours of specialized training. The response team executed numerous high- risk search warrants in support of the Drug, Vice and Organized Crime Section. 9 Drugs,Vice and Organized Crime Section 5 Dover Police Officers who work in plain clothes pcapacity. Because of their dedication seizures include 30,512 grams of cocaine; 27,325 grams of marijuana and $75, 648.00 9 Operation Safe Streets In addition to the Drug Unit and the DEA Task force the Dover PD continues to support the Operation Safe Street Initiative. They concentrate efforts on street level sales of illegal narcotics and current probationers who live within the city limits.

Paj 15

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Electronic Red Light Safety Program (ERLSP)

Paj 16

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Dover Fire Department 9 1,161 emergency responses last year; An increase of 1.2% over last year 9 2,600 hours of firefighter training provided which entailed more than 100 different training courses 9 Several firefighters also took advanced rescue training and received certification through the National Fire Protection Association 9 3,000 children participated in fire safety programs 9 300 smoke detectors given to City residents

Paj 17

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 DOVER FIRE DEPARTMENT The Dover Fire Department was organized in 1882 and recently celebrated its 125th Anniversary. In 2007, 200 men and women volunteered 17,606 hours of time to help make Dover safe. Department currently maintains and operates: 5 engines 2 ladder trucks 2 heavy rescue vehicles A Brush Unit A foam trailer A rescue boat 2 utility trucks 2 command vehicles

Paj 18

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Connecting With Citizens CRM PROGRAM City of Dover Citizens Relations Newsletter Management Program African American Festival COMING Public SOON! Affairs Coordinator Senior Verizon EG Citizen Tax Channel Reduction CGI Videos

Paj 19

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Parks & Recreation ƒ Old Dover Days celebrated their 75th Anniversary the first weekend of May ƒ Sl ilver Lake R evitalization project started with tree l l planting l along St. Jones River ƒ 2007 Spring Summer Performing Arts Series hosted 5,007 people on The Green for the free Thursday evening performances ƒ Silver Lake kayak tours had 59 people register, this was the first year we offered this lake activity ƒ Annual Tree Lighting drew a crowd of about 800 people ƒ Greater Dover Arts Council presented the first Mayor’s Arts Award to two (2) y Phyllis Levitt and the Dover Art League

Paj 20

EXHIBIT #1 75th Anniversary COUNCIL MINUTES 05/12/2008 OLD DOVER DAYS

Paj 21

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 John W. Pitts Center Grand Opening of the John W. Pitts Recreation Center was held April 24, 2008

Paj 22

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Dover ANCHOR Library City Hall and Post Office Parking Lot is the selected site for the New ANCHOR library! Meeting space for everyone DOVER Youth space Novel programs ANCHOR LIBRARY Excellent resources -Formed a citizen- Way more computers based committee for Lots of parking Information everywhere the Anchor Books galore Library project “A library says a lot Room for everything consisting of three Adult reading area about a community.” Recreation destination subcommittees, You’ll love it! building design, SHOW YOUR public relations and SUPPORT FOR THE fundraising NEW DOVER PUBLIC LIBRARY -The City has THE ANCHOR LIBRARY committed 3.7 million Architect Firms have FOR CENTRAL DELAWARE! in a library reserve been interviewed! fund for the Anchor Decision to be Library project! CONTACT YOUR announced soon! LEGISLATORS

Paj 23

EXHIBIT #1 EXTRA EXTRA COUNCIL MINUTES 05/12/2008 READ ALL ABOUT IT! HEADLINE NEWS IN OTHER NEWS… Library Visitors Programs Designed for INCREASE at Dover Public Library Children and Adults Continues to Dover, DE Acting Library Director Joan Draw Crowds at Dover Public Library Stover announced that the Dover Public Dover, DE Karen DeMarco from the Library continues to see a steady Dover Public Library is proud that the increase in patrons on a regular basis. library programs draw such terrific crowds. “We are sure when the new 2006: 354,967 , library is built and the space allows, even more will join us.” 2007: 396,837 Adult Programs 2006: 1352 41,870 MORE 2007: 1859 people visited the Children’s Programs Dover Public Library in 2006: 14,268 2007: 8052* 2007 *Due to lack of children’s librarian for partial year

Paj 24

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Public Utilities Improved Electric Service y 69Kv Feeders 3 & 4 Phase I, to improve reliability and future growth. y College Road Substation - to improve reliability for north Dover customers and serve the ongoing growth. y Mayfair Substation was rebuilt to increase capacity and improve reliability for customers in the SW portion of the system. y Replacing older underground lines throughout the City.

Paj 25

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Public Utilities Electric Department y NAES Staff celebrated 3-years accident free. y Installing pollution control equipment to improve Dover’s air quality. y Replacing air monitoring equipment to ensure regulatory compliance. y City Staff demolished and rebuilt Mayfair Substation - y Station was brought on-line April 27, 2008.

Paj 26

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Water System Upgrades y Installed 6 of the 12 deep well contact time chambers to mitigate eliminate brown water issues. y Continue system-wide flushing as part of the Water Quality Improvement Program. y Completed the redevelopment of freshwater Well No. 8. y Installed Variable Frequency Drive (VFD’s) at the White Oak Pumping Station in order to improve ffi i efficiency and reduce future maintenance costs.

Paj 27

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Dover: A Great Place to Live! ¾ Fortune Small Business Magazine placed Dover at No. 55 in its compilation of “100 Best Places to Live and Launch 2008.” ¾ DAFB Received 2008 Commander In Chief Installation Excellence Award (This is the first time in the 23-year history of this prestigious award that an Air Mobility Command installation has been recognized as the Air Force's best.) ¾ Dover High School Recognized, for second year in a row, as one of the Top Schools in the U.S.A.!

Paj 28

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Strategic Initiatives ♦ Establish an Anchor Library in Dover ♦ Promote Homeownership & Promote Affordable Housing ♦ Maintain and Improve Infrastructure, and Implement Brown Water Solutions ♦ Strengthen Property Maintenance and Enforcement ♦ Develop a Plan to secure Electric Generation for the next 20 years ♦ Support the building of a Cultural Center ♦ Create an Economic Development Strategy

Paj 29

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Proposed Initiatives 9 Brown Water Solutions 9 Reducing Cost of Medical & Retirement benefits 9 Future Generating Capacity; Dover Energy 2030 9 Reducing Inflow and Infiltration 9 Silver Lake Management 9 Comprehensive Plan Update 9 Create Economic Development Strategy

Paj 30

EXHIBIT #1 COUNCIL MINUTES 05/12/2008 Government Efficiency State of the City Presentations 60 50 53 50 48 40 30 32 20 10 0 2005 2006 2007 2008 Number of Slides

Paj 31

EXHIBIT #1 Sometimes we have to stop and smell COUNCIL MINUTES 05/12/2008 the flowers….

Paj 32

EXHIBIT #1 The City of Dover COUNCIL MINUTES 05/12/2008 THANK YOU! Continued Community Excellence Through Quality Service!

Paj 33

City of Dover Effective July 1, 2008 Electric Tariffs Net Energy Metering “NM” AVAILABILITY This rider is available to customers served under the following service classifications, Residential “R”, Small Commercial “C and C1”, Medium Commercial “C2 and C3", Large Commercial “C5", Primary “P”, and Transmission “T” who own and operate an electric generation facility on the Customer’s premises. The primary intent of this installation is to offset part or all of the Customer’s electricity requirements. Capacity cannot be more than 25 kW for residential customers and 500 kW for non-residential customers. The primary source of fuel must be solar, wind, hydro, or another approved source of renewable energy. This rider is applicable to generation interconnected and operated in parallel with the City of Dover’s transmission and/or distribution facilities. Application for the installation of any generation system in excess of 500 kilowatts shall be made under a special contract. Any customer who elects this rider must apply by filling out the City of Dover Generator Interconnection Application at least 60 days in advance of the proposed activation date. Approval of the application by the City must be granted prior to activation of the electric generation facility. CONNECTION TO THE CITY’S SYSTEM The electric generation system cannot be connected to the City’s system unless it meets all applicable safety and performance standards set forth by the following: The City of Dover Technical Considerations Covering Parallel Operations of Customer Owned Generation of 500 kW or less dated July 1, 2008, National Electric Code, the Institute of Electrical and Electronic Engineers, Underwriters Laboratories, and the City of Dover Electric Service Handbook. The Customer must, at his/her expense, obtain any and all necessary permits, inspections, and approvals required by any local public authorities and any other governing regulations in effect at that time. DELIVERED VOLTAGE The delivered voltage and delivery point of the Customer’s electric generation shall be at the same delivered voltage and delivery point that would be supplied by the City if the Customer purchased all of its electricity from the City. CONTRACT TERM The contract term shall be the same as the Customer’s applicable rate tariff. RATE The monthly billing shall be as stated in the applicable rate tariff. Under this rider, only the per kWh charge for electricity delivered by the Customer is affected. The Customer will pay for all kWh delivered by the City of Dover. If the Customer has delivered electricity to the City’s system a credit will be issued equal to the City’s current kWh rate for that particular class of customer (equal to the Delivery Service Charges and Supply Service Charges). This credit will be applied to subsequent billing periods to offset a customer’s consumption (City delivered kWh) in those billing periods until all credits are used or until the end of a twelve month period. After a 12 month period ending either on December 31 or July 31, to be chosen at the discretion of the customer, any excess kWh credits shall be forfeited to the City for use solely to augment existing funding for the Green Energy Fund. The payment to the Green Energy Fund shall be equal to the avoided cost of wholesale power. Any excess kWh credits from the customer shall not reduce any fixed monthly customer charges, taxes or other components of the electric bill imposed by the City. METERING

Paj 34

City of Dover Effective July 1, 2008 Electric Tariffs A bi-directional watt-hour electric meter will be installed at the Customer’s location to measure the energy consumed and the energy delivered to the City system. The City will furnish, install, maintain, and own all bi- directional revenue meters. However, where a large capacity meter is required to serve a customer, or a larger capacity meter is requested by the customer, the customer shall pay the City the difference between the larger capacity meter and the meter normally provided under the customer’s applicable rate tariff. Cost will be determined under the Additional Costs and Responsibilities clause below. ADDITIONAL COSTS AND RESPONSIBILITIES The customer will be required to pay for any additional transmission and distribution costs, transformation, system protection, and any related safety/protective equipment in excess of what would normally be paid for by the City. Protective equipment will be installed by the Customer to provide safety for personnel, provide adequate protection for the City’s electric utility system and to the Customer’s property, and to prevent any interference with the City’s supply of energy to other utility customers. This equipment will be owned, installed, and maintained by the Customer. FAILURE TO COMPLY The City may disconnect the Customers service from the City’s electric system if the Customer fails to comply with any of the stipulations of this rider, The Technical Considerations Covering Parallel Operations of Customer Owned Generation of 500 kW or Less dated July 1, 2008, National Electric Code, the Institute of Electrical and Electronic Engineers, Underwriters Laboratories, the Generator Interconnection Application and the City of Dover Electric Service Handbook. RULES AND REGULATIONS The General Rules and Regulations of the City of Dover for electric service shall apply to service rendered under this service classification. All minimum billings, charges for kWh, kW, Purchased Power Adjustment, Public Utility Tax, Renewal Energy Charge, etc. will be covered under the applicable rate tariff. ADOPTED: May 12, 2008

Paj 35

City of Dover Electric Service Handbook Division VI Interconnection Agreement Technical Considerations Covering Parallel Operations of Customer Owned Generation Of 500 Kilowatts or Less And Interconnected with the City of Dover System July 1, 2008 Technical Considerations Covering Parallel Operations Of Customer Owned Generation of 500 Kilowatts or less and Interconnected with the City of Dover Delivery System Prerequisite – The customer must first be in compliance with the tariff rules and regulations and the applicable tariff classification and rates. The terms and conditions contained herein are in addition to, but do not modify nor negate, the terms of the tariff. I Purpose – The purpose of this document (relating to interconnection of on-site distributed generation and parallel generation requirements) is to clearly state the terms and conditions that govern the interconnection and parallel operation of on-site distributed generation, in order to: A. establish technical requirements which will promote the safe and reliable parallel operation of distributed generation resources; B. enhance the reliability of electric service; C. facilitate the implementation and use of distributed resources technologies; D. enhance economic efficiency in the production and consumption of electricity and other energy; and E. promote the use of distributed resources in order to provide electric system benefits during periods of capacity constraint. II Applicability - Unless otherwise provided, these guidelines apply to all customer generation operating below 501 kilowatts which is interconnected at 34.5kV or below and operated in parallel with the Company’s power delivery System. The technical requirements of Section XIV and subsequent sections of this document do not apply to NEM Rider Tariff generators using inverter technology, as requirements for these installations are already covered in the applicable codes, IEEE Standard 519, Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems, IEEE Standard 929, Recommended Practice for Utility Interface of Photovoltaic (PV) Systems, NEC 690, Solar Photovoltaic Systems, UL 1703, Standard for Safety Flat-Plate Photovoltaic Modules and Panels, and UL 1741, Underwriters Laboratories Subject 1741-1999, Standards for Static Inverters and Charge Controllers for use in Photovoltaic Power Systems. III Definitions A. Account - an account is one metered or un-metered rate or service classification which normally has one electric delivery point of service. Each account shall have only one

Paj 36

electric service supplier providing full electric supply requirements for that account. A premises may have more than one account. B. Company – City of Dover C. Customer – any adult person, partnership, association, corporation, or other entity: (i) in whose name a service account is listed, (ii) who occupies or is the ratepayer for a premises, building, structure, etc., and (iii) who is primarily responsible for payment of bills. A customer includes anyone taking Delivery Service or combined Electric Supply & Delivery Service from the Company under one service classification for one account, premises or site. Multiple premises or sites under the same name are considered multiple Customers. D. Distributed Generation or On-Site Distributed Generation - an electrical generating unit of less than or equal to 500 kW which may be connected in parallel operation to the Company’s system. E. Generator Owner - the owner of the generating system that is interconnected to the Company. F. Grid - the interconnected arrangement of lines and transformers that make up the Company’s electric power system. G. IEEE Standard 929 - IEEE Standard entitled Recommended Practice for Utility Interface of Photovoltaic (PV) Systems, P929 Draft 11, dated July, 1999, or subsequent approved revision thereof. H. Interconnection – the physical connection of distributed generation to the Company’s system in accordance with these guidelines so that parallel operation can occur. I. Interconnection Application - the standard form of application which must be submitted by the Generation Owner to the Company for permission to interconnect with the Company system. The approved Interconnection Application sets forth the contractual conditions under which the Company and Generator Owner agree that one or more generating units whose aggregate generation at the Point of Common Coupling is less than or equal to 500 kW may be interconnected at 34.5 kV or less with the Company’s system. J. Inverter – a static power converter with control, protection and filtering functions that converts Direct Current input to Alternating Current output. Inverters must be of the non-islanding type. K. Island - a portion of the utility system which contains both load and distributed generation and is isolated from the remainder of the utility system. L. Parallel Operation - any electrical connection between the Company’s system and the Generator Owner’s generating source. M. Point of Common Coupling - the point where the electrical conductors of the Company system are connected to the Customer’s conductors and where any

Paj 37

transfer of electric power between the Generator Owner and the Company System takes place (such as switchgear near the meter). N. Pre-Approved Equipment - specific generating and protective equipment system or systems that have been approved by the Company as meeting the applicable parts of this document. O. Pre-Interconnection Study - a study or studies which may be undertaken by the Company in response to its receipt of a completed application for parallel operation with the Company’s system submitted on the Interconnected Application form prescribed by these guidelines. Pre-Interconnection Studies may include, but are not limited to service studies, coordination studies and facilities impact studies. P. Qualifying Facility (QF) - an electric generation facility which is a qualifying facility under Subpart B, Section 201 of the Federal Energy Regulatory Commission’s regulations per the Public Utility Regulatory Policies Act of 1978. Q. Stabilized - the Company’s system following a disturbance which returns to the normal range of voltage and frequency for at least 5 minutes or longer as coordinated with the Company. The Company may require a longer period upon a reasonable showing that the reconnection after 5 minutes will adversely affect the safety and reliability of the electric system. R. Unit – a distributed generation facility. S. Utility System or Electric Distribution Facility - Company’s distribution system operating at 34.5 kilovolts or below to which the generation equipment is interconnected. IV Interconnection Application - A proposed Generator Owner will make a formal application to the Company for the interconnection of a generator to the Company system. The application will be made on an Application Form provided by the Company. V Designation of Company Contact Persons for Matters Relating to Distributed Generation Interconnection – The Company’s Electric Engineering Department will be the designated point of contact for all matters related to interconnected generation. The Company will maintain records concerning applications received for interconnection and parallel operation of distributed generation. Such records will include the date of receipt of each such application, documents generated in the course of processing such applications, correspondence regarding such applications and the final disposition of such application. VI Pre-Interconnection Studies – In many instances the Company will wish to conduct a service study, coordination study, or facilities impact study prior to interconnection of a distributed generation unit. In instances where such studies are deemed necessary the scope of such studies shall be based on the characteristics of the particular distributed generation unit to be interconnected and the proposed point of interconnection. A) Completion of Pre-interconnection Study - Upon completion of the interconnection study, the Company will notify the Generator Owner that his application has been approved or indicate insufficient detail why the application

Paj 38

cannot be approved. The conducting of such pre-interconnection studies shall not unduly delay the interconnection of the distributed generation. In no event shall such studies take longer to complete than 4 weeks after receipt of signed customer application and customer submittal of all required data. B) Pre-interconnection Study Fee - The Company will do a pre-interconnection study without charge up to the typical and customary cost that the Company would expend for study work of similar type of customer interconnection. If the cost to the Company is expected to exceed this typical and customary amount, or if multiple submittals by the Generator Owner are necessary, the Company will advise the Generator Owner of the expected cost of such study work by the Company before such work begins. The Generator Owner will be responsible for payment of all costs above the typical and customary amount. VII Network Interconnection of Distributed Generation – Where generation is to be connected to a network system and capable of exporting power to the Grid, the interconnection study may result in more stringent interconnection requirements. VIII Pre-approval of Generation units, Devices and Systems - Upon approval by the Company that certain generating unit’s protective devices and/or system(s) meet the standards set out in these guidelines, such approval shall be made available to the appropriate manufacturer upon written request. For subsequent applications using some or all of the identical generating unit’s protective devices and/or systems, the manufacturer may submit a copy of the approval with the application as proof that its equipment has already been approved for use on the Company’s system. Use of pre-approved equipment will not eliminate any applicable requirement for a pre-interconnection study to determine the suitability of the equipment for each application, given the unique arrangements and characteristics of both the Generator Owner and Company systems at the point of the interconnection. IX Connection Approval – The Generator Owner can connect their generation to the Company system only after the Interconnection Application has been approved and the Generation Owner has received approval notification. The Company will provide notification within four weeks after the receipt of the Interconnection Application and all required data. X Interconnected Generation Site Warning Label – The Generator Owner will install a warning label in a conspicuous place on their electric meter or meter box to notify the Company personnel that there is a generator source installed on the load side of the meter. The warning label shall not be placed in a location that would interfere with the ability of Company personnel to read the electric meter. The Company will provide the warning label to the Generator Owner. The warning label must be placed before the generation can be interconnected. XI Disconnection and Reconnection. The Company may disconnect a distributed generation unit under the following conditions: 1) Application Termination – Upon termination of the approved Interconnection Application. 2) Non Compliance – For non-compliance with the technical guidelines specified in this document or other requirements contained in the applicable Customer Tariff, provided that the Company has given notice to the Generator Owner and provided

Paj 39

the Generator Owner reasonable time (consistent with the condition) to correct such non-compliance. The Company will reconnect the unit only upon receipt of certification from the Generator Owner and verification by the Company that the unit is in compliance. The Company will provide verification within a reasonable time period. 3) In Case of a system emergency outage of the Company’s Primary Electrical Sources – The Generator Owner’s generation equipment must be installed and configured so that parallel operation must automatically cease immediately and automatically during outages or loss of the Company’s electric source in accordance with these guidelines. The Generation Owner must also cease parallel operation upon notification by the Company of a system emergency, abnormal condition or in cases where such operation is determined to be unsafe, interferes with the supply of service to other customers or interferes with the Company’s system maintenance or operation. In addition, the Company may disconnect the generator from the system for system emergencies without notice. However, the Company will use reasonable efforts to notify the Generation Owner prior to disconnecting. 4) For Routine Maintenance and Repairs – The Company may disconnect a Customer/Generation Owner for routine maintenance and repairs on the Company’s system consistent with applicable tariffs and agreements. The Company will make reasonable efforts to provide advance notice to the Customer/Generation Owner of service interruptions resulting from routine maintenance. The Company will reconnect the Customer/Generation Owner as quickly as possible under reasonable operations constraints following any such service interruption. XII Termination – The Generation Owner may terminate the approved Interconnection Application at any time upon thirty (30) days of providing written notice to the Company. The Company may terminate the Interconnection Application for cause after 60 days written notice to the Generator Owner of a material violation of the terms of the approved Interconnection Application and after the Generator Owner has had a reasonable opportunity to remedy the violation. The Generator Owner must give the Company notice that it intents to permanently shut down his generation. XIII Privileged Communications Concerning Proposed Distributed Generation Projects – In the course of processing applications for parallel operation and in the conduct of pre- interconnection studies, the Generation Owner shall provide the Company with detailed information concerning the proposed distributed generation project. The Company shall not use such knowledge of proposed distributed generator projects submitted to it for review to prepare competing proposals to the Generator Owner whereby the Company, or its affiliate, offers either discounted rates in return for not installing the distributed generation, or offers competing distributed generation projects. XIV Technical Guidelines for Parallel Operation of On-site Distributed Generation Units – This subsection describes minimum requirements and procedures for safe and effective connection and operation of distributed generation. A Generator Owner may operate 60 Hertz, three phase or single phase generating equipment, whether a QF or non-QF, in

Paj 40

parallel with the Company’s system pursuant to an approved Interconnection Application provided that the equipment and Generator Owner meet or exceed the requirements of these guidelines or the NEM Rider Tariff requirements and that the Company has approved the Generator Owner’s application to interconnect. This subsection describes typical interconnection requirements. Certain specific interconnection locations and conditions may require the installation of additional protective hardware or special protection settings, especially when exporting power to the system. If the Company excludes that an application for parallel operation requires additional protective hardware or special protection settings, the Company shall make those requirements known to the Generator Owner within 14 days after all pertinent studies are completed. Approval to connect to the Company system indicates only that the minimum requirements for a safe proper interconnection have been satisfied. Such approval does not imply that the Generator Owner’s facility meets all federal, state and local standards or regulations. A) General Interconnection and Protection Requirements. 1) The Generator Owner’s generation and interconnection installation must meet all applicable national, state, and local construction and safety codes. 2) The Generator Owner’s generator shall be equipped with protective hardware and software designed to prevent the generator from energizing one of the Company’s de-energized circuits. The Generator Owner’s generator must automatically disconnect from the Company’s system if the Grid source is lost, irrespectively of connect loads or other generators. 3) The generator shall be equipped with the necessary protective hardware and software designed to prevent sustained parallel operation of the generating equipment with the Company’s system unless the system service voltage and frequency are within acceptable magnitudes as defined in Section XIV.B. 4) Pre-approved equipment shall be accepted as part of an interconnection proposal without the need to re-review the equipment itself. However, the application, design and setting of pre-approved units and/or equipment must be reviewed and coordinated according to the unique needs of the specific location of the proposed installation. Where a complete unit or system has been pre-approved, only location-specific issues will typically need to be reviewed. 5) The Generator Owner will be responsible for protecting its own generating and interconnection equipment in such a manner so that Company system outages, short circuits, single phasing conditions or other disturbances including zero sequence currents and ferroresonant over-voltages do not damage the Generator Owner’s generating equipment. The protective equipment shall also prevent excessive or unnecessary tripping that would adversely affect the Company’s service reliability to other Generator Owners and Customers. 6) The generator and interface protection schemes shall be continuously monitored and functioning and the generator shall immediately disconnect from the Company’s system for any condition that would make the protection scheme inoperable.

Paj 41

7) The operating power required for the protection and control schemes for the generator and the control power used to disconnect the generator from the Company must not be dependent on local Company grid power. 8) Where multiple generators are connected to the system through a single point of common coupling, the sum of the ratings of the generators will be used to determine the applicability of these guidelines. Protection scheme performance with one or more units off line will have to be considered. 9) Applicable circuit breakers or other interrupting devices at the Generator Owner’s facility must be capable of interrupting the maximum available local utility Company fault current at the site, including any contribution from the Owner’s generator(s). 10) The Generator Owner will furnish and install a manual disconnect device which, when opened, will have the effect of isolating the generator from the Company’s system. The disconnect device shall have a visible break (a disconnect switch, a draw-out circuit breaker, fuse block, etc. as appropriate to the voltage level), will at all times be accessible to the Company’s personnel, and shall be capable of being locked in the open position via a Company padlock. The Company shall use reasonable efforts to utilize padlocks of a size consistent with typical manufacture’s specifications. The Generator Owner shall follow the Company’s switching, clearance and tagging procedures which the Company shall provide and attach the Warning Label noted in Section X. 11) The design, procurement, installation, and maintenance of the equipment at the Generator Owner’s site are the responsibility of the Generator Owner and at the Generator Owner’s expense. 12) Any necessary enhancements or improvements needed within the Company’s system and/or at the Customer site(s) to accommodate the parallel interconnection of the Generator Owner’s generation will be at the Generator Owner’s expense. 13) The Generator Owner has full responsibility and liability for the safe and proper operation of their equipment and the power originating from their generator. The Generator Owner is also responsible for synchronizing their generator(s) with the Company’s system and maintaining synchronous operation. 14) The Generator Owner must immediately cease parallel operation upon notification by the Company if such operation is determined to be unsafe, interferes with the supply of service to other customers, or interferes with the Company’s system maintenance or operation. 15) The Company reserves the right to specify the type of transformer connection (e.g. delta-delta, wye-delta, wye-wye) that will be employed for all multiphase interface transformers consistent, where reasonable, with the Generator Owner’s power system. B) Prevention of Generator Owner Generation Interference with Company System. To eliminate undesirable interference caused by operation of the Generator Owner’s

Paj 42

generating equipment, the Generator Owner’s generator shall meet the following criteria: 1) Voltage – The generating equipment will be operated in such a manner that the voltage levels on the Company’s system are in the same range as if the generating equipment were not connected to the Company’s system. The Generator Owner shall provide an automatic method of initiating a disconnect sequence of his generating equipment from the Company system with set points noted in the table below. Generating Systems Generating Systems with Non-Inverter or with Inverters Greater than Rotating Inverters Up to 500kW Machine Generating 500kW Systems • Trip in 0.1 second • Trip in 0.1 Second for • Trip in 0.1 second for for V<50% V <50% V < 50% or V ≥115% • Trip in 2 second for • Trip within 0.1 to 30 • Trip within 0.1 to 30 50%≤V<88% seconds for seconds for V>110% • Trip in 2 seconds for 50%≤V<88% or 106%<V<137% • Trip within 0.1 to 30 V<90% • Trip in 0.03 second seconds for (Specific voltage and time for 137%≤V 106%<V<137% delay set points will be (Above times and • Trip in 0.03 second for determined for each voltages installation.) 137%≤V taken directly from IEEE (Specific voltage and time 929) delay set points will be determined for each installation.) Note: Trip time refers to the time between when the abnormal voltage condition occurs and the generator being completely disconnected from the utility Company. On three phase generator installations, full three phase voltage sensing should be employed. Voltages must be sensed on the high side of any interface transformer if the transformer high voltage winding is ungrounded. The Generator Owner may reconnect to the grid when the system voltage returns to normal range and is stabilized as defined in Section III, Definitions. 2) Flicker – The Generator Owner shall not cause excessive voltage flicker on the Company’s system. This flicker shall not exceed the “Borderline of Irritation” curve, Fig. 10.3, as define in IEEE Std 519-1992, Recommended Practices and Requirements for Harmonic Control in Electric Power Systems. Lower levels of flicker may be required in areas where equipment such as computers and instrumentation are impacted. 3) Frequency – The operating frequency of the generating equipment shall not deviate more than the values noted in the table below. Generating Generating Systems with Non-Inverter or Rotating Systems with Inverters Greater than Machine Generating Inverters Up 500kW Systems to 500kW

Paj 43

• Trip in 0.1 • Trip in 0.1 second for • Trip in 0.1 second for second for F<59.3 Hz F<59.3 Hz F<59.3 Hz • Trip in 0.1 second for • Trip in 0.1 second for • Trip in 0.1 F>60.5 Hz. F>60.5 Hz. second for (Other frequency and time delay (Other frequency and time delay F>60.5 Hz. set points may be necessary for a set points may be necessary for a (Set points taken specific installation.) specific installation.) from IEEE 929) Note: Trip time refers to the time between when the abnormal frequency condition occurs and the generator being completely disconnected from the utility Company. The Generator Owner may reconnect when the system frequency returns to normal range and is stabilized as defined in Section III, Definitions. 4) Harmonics – Non-linear circuit elements such as inverter can produce harmonics. Per IEEE std 519, Recommended Practices and Requirements for Harmonic Control in Electric Power Systems, Table 11.1, the total harmonic distortion (THD) voltage shall not exceed 5% of the fundamental 60 Hz frequency nor 3% of the fundamental for any individual harmonic as measured at the location where the customer interfaces with the Company’s system (Point of Common Coupling). In addition, the level of harmonic current that the customer is allowed to inject into the Company’s system shall not exceed that specified in Table 10.3 in IEEE Std 519. Furthermore, any communication notch should be limited as defined by Table 10.2 in IEEE Std 519. The preceding requirements apply to all types of generation systems. The Generator Owner is responsible for the installation of any necessary controls or hardware to limit the voltage and current harmonics generated by his equipment to defined levels. 5) Power Factor – The generator must not adversely impact the power factor of the Generator Owner site. Most inverters are designed to operate close to unity power factor. The operating power factor of the generator shall be contained within the limits defined in the table below. Generating Generating Systems with Non-Inverter or Rotating Systems with Inverters Greater than 500kW Machine Generating Inverters Up Systems to 500kW 0.95 Lagging 0.95 Lagging or Leading 0.95 Lagging or Leading or Leading When output exceeds 10% when output of inverter rating. exceeds 10% of inverter rating. (From IEEE 929-1999) However, to the extent that a Generator Owner’s power factor at the Point of Common Coupling falls below 0.95 lagging as a direct result of the installation of the generating unit(s), the Generator Owner must obtain, install and maintain, at his

Paj 44

expense, corrective apparatus that compensates for the drop in power factor caused by the installation of the generator. Penalties will be assessed for power factors that fall below 0.95 lagging or leading. 6) Current – In some cases, directional over-current protection may be required to limit fault current flowing onto the Grid in the event of a line fault. DC inverters that are incapable of producing fault current do not require directional over- current protection. Inverter systems should not inject DC current greater than 0.5% of rated inverter output into the AC interface point under either normal or abnormal conditions. 7) Fault and Line Clearing – The Generator Owner shall automatically disconnect from the Company’s system during electrical faults on the Company’s electrical system and upon loss of the Company’s electric source. The Generator Owner may reconnect when the system voltage and frequency return to normal range and is stabilized as defined in Section III, Definitions. Detection of the loss of the Company’s primary electric system, where the Generator Owner is operating in an island with other customer load, becomes increasingly difficult as the level of distributed generation on a feeder approaches the connected load. For generating units 500kW and below, the over/under voltage and over/under frequency settings described previously along with the anti-islandizing provisions of IEEE 929/UL 1746 inverters, should be sufficient to satisfy this provision. 8) Automatic Reclosing – The Generator Owner is responsible for protecting his equipment from the effects of switching or automatic reclosing of the Company’s feeder circuit. The Generator Owner may request the Company to delay high speed reclosing on the Company’s feeder to allow the interconnected generator sufficient time to remove itself from an islandized or de-energized feeder prior to automatic reclose. Since delaying the automatic reclose time degrades the level of service provided to other customers on the circuit, the Company will limit the automatic reclose time delays to a few seconds or less. The Generator Owner may also request that a direct transfer trip scheme be added to remove the interconnected Generator from service prior to automatic reclosing by using communications equipment between the generator site and the Company. Similarly the Generation Owner may request that a synchronizing check, or reclose blocking scheme be installed on the Company’s feeder to prevent out of phase reclosing. The Generation Owner is responsible for all costs associated with the installation and maintenance of these requested modifications. C. Control, Protection and Safety Equipment Requirements Specific to Generators of 500 kW or less. All Generator Owners 500 kW or less can be single phase. Customer owned generators greater than 10 kW must be evaluated by the Company to determine if it can be single phase. The following table describes necessary control, protection and safety equipment specific to generator of 500kW or less connected to Secondary or Primary Voltage Systems: Control, Protection and Safety Equipment for Generators of 500 kW1 or Less Connected to

Paj 45

Secondary or Primary System Generator Size 500 kW or less Over-Current Trip X Over-Voltage Trip X Under Voltage Trip X Over/Under Frequency Trip X Synchronizing Check2 Manual or Automatic Notes: 1. Exporting to the Company system many require additional operational/protection devices. 2. For synchronous and other type of generators with stand-alone capability. D) Control, Protection and Safety Requirement Specific to Three Phase Synchronous Generators, Induction Generators, and Inverter Systems. Generators greater than 500 kW must be three phase machines connected to three phase circuits. 1) Three Phase Synchronous Generators. Generator circuit breakers shall be three phase devices with electronic or electromechanical control. The Generation Owner is solely responsible for properly synchronizing his generator with the Company’s system. For a synchronous generator, the excitation system response ratio shall not be less than 0.5 (five-tenths). The generator’s excitation system(s) shall conform, as closely as reasonably achievable, to the field voltage vs. time criteria specified in American National Standards Institute Standard C50.13-1989 in order to permit adequate field forcing during transient conditions. 2) Three Phase Induction Generators and Inverter Systems. Induction generation may be connected and brought up to synchronous speed (as an induction motor) if it can be demonstrated that the initial voltage drop measured on the Company’s side at the point of common coupling is within the visible flicker limits stated in Section XIV.B.2. Otherwise, the Generator Owner may be required to install hardware use other techniques to bring voltage fluctuations to acceptable levels. Line-commutated inverters do not require synchronizing equipment. Self-commutated inverters whether of the utility-interactive type or stand-alone type shall be used in parallel with the Company system only with synchronizing equipment. Control, Protection and Safety Equipment1 Greater than 25kW and Less than 500kW, Three Phase Connected to Primary System Generator Disconnect Device X Over-Voltage Trip X Under Voltage Trip X Over-Current Trip X Over/Under Frequency Trip X Ground Over-Voltage Trip2 OR X Ground Over-Current Trip2 Synchronizing Check3 Manual or Automatic

Paj 46

Power Direction4 X Transfer Trip/Reclose Blocking5 X Notes: 1. Exporting to the Company’s system may require additional operating/protection devices and will require coordination of operations with the Company. 2. Selection depends on grounding system, if required by the Company. 3. For synchronous and other types of generators with stand-alone capability. 4. Required only if generator size is greater than Generator Owner’s minimum load and thus capable of exporting. The relay will operate if the power flow from the generator into the Grid exceeds a predetermined level. A time delay will have to be incorporated into this relaying scheme to prevent it from operating during synchronous swings. 5. May be required as part of any necessary transfer tripping/reclose blocking protection scheme. a. Requirements Specific to Generators paralleling for 0.1 second or less (Closed Transition Switching) The table below shows the protective functions required by this requirement for generators less than 500kW which parallel with the Company’s system for 0.1 second or less such as during source or load transfers. Control, Protection and Safety Equipment Generators Connected to Secondary or primary System Voltage For 0.1 Second or Less (Closed Transition Switching) Generator Size Up to 500kW Over-Voltage Trip X Under Voltage Trip X Synchronizing Check1 Manual or Automatic Excessive Closed Time Trip2 X Notes: 1. For synchronous and other types of generators with stand-alone capability. 2. Scheme will trip generator if closed transition parallel mode remains in effect longer than 0.1 second. F) Inverter Type – DC Generation installations using inverters for interconnection with the Company must use non-islanding type inverters as defined in IEEE 519, Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems, IEEE 929, IEEE Recommended Practices for Utility Interface of Photovoltaic (PV) Systems (including Annex B, D, E & G) and UL Subject 1741, May 1999, Standard for Static Inverters and Charge Controllers for use in Photovoltaic Power Systems. G) Inspection and Start-Up Testing – the Generator Owner shall provide the Company with reasonable prior notice at least 2 weeks before the initial energizing and start-up testing of the Generator Owner’s generating equipment and the Company, at its discretion, shall witness the testing of any equipment and protective systems associated with the interconnection. The Generator Owner shall revise and re-submit the application

Paj 47

information for any proposed modification that may affect the safe and reliable operation of the Company’s system. The generator may be reconnected to the Company system only after the modified application has been reviewed, testing has been confirmed and the Company has given approval to reconnect. H) Site Testing and Commissioning - Testing of protection systems shall include procedures to functionally test all protective elements of the installation up to and including tripping of the generator and interconnection point. Testing and testing intervals should be in accordance with manufacturers’ and industry recommendations. Testing will verify all protective set points and relay/breaker trip timing. The Company may witness the testing of installed switchgear, protection systems, and generator. The Generator Owner is responsible for all maintenance of the generator, control and protective equipment. The Generator Owner will maintain records of such maintenance activities which the Company may review at reasonable times. I) Metering - Metering requirements will be reviewed on each specific installation. J) Dedicated Transformer – A dedicated transformer will be required where the generating Generator Owner is served from the same transformer secondary as another Company customer and inverter-based technology not meeting IEEE 929-1999 and IEEE 519-1992 specifications is used. In addition, a dedicated transformer or other current- limiting device is needed for any type of generator installation where the increase in available short circuit current could adversely impact other Company customers on the same secondary circuit. K) Suggested References The following references can supply technical support and insight into the safe, reliable interconnection of distributed generation with the Company’s systems. These references should be reviewed by those individuals or firms contemplating parallel operation of generation with the Company. IEEE C37.95-1989 - IEEE Guide for Protective Relaying of Utility-Consumer Interconnections IEEE Std 1001 (1988) - IEEE Guide for Interfacing Dispersed Storage and Generation Facilities with Electric Utility Systems IEEE Std 929 - IEEE Recommended Practices for Utility Interface of Photovoltaic (PV) Systems IEEE Std 1021 (1988) - IEEE Recommended Practices for Utility Interconnection of Small Wind Energy Conversion Systems IEEE Std 519 -1992 - IEEE Recommended Practices and Requirements for Harmonic Control In Electrical Power System NEC 690 - Solar Photovoltaic Systems UL 1703 -Standard for Safety Flat-Plate Photovoltaic Modules and Panels UL 1741 - Standards for Static Inverters and Charge Controllers for use in Photovoltaic Power Systems