Ale nan kontni prensipal la
AskDover

Planning Commission Meeting Packet

Planning Commission. 17 fevriye 2026.

Louvri PDF la (22.2 MB)

Yo rale tèks sa a nan PDF la otomatikman, epi li ka gen erè. PDF la se dosye ofisyèl la, kidonk tcheke l anvan ou konte sou sa a.

5 paj pa gen anpil tèks ou ka li isit la, oswa yo pa gen ditou, souvan paske se eskanè oswa desen. Gade PDF la pou sa yo.

Paj 1

CITY OF DOVER, DELAWARE

PLANNING COMMISSION

Tuesday, February 17, 2026 at 6:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware

AGENDA

Written comments are accepted via mail to City of Dover – Planning Commission, P.O. Box 475 Dover DE 19903 and via email at CompPlan@dover.de.us.

IN-PERSON and VIRTUAL MEETING NOTICE

The Planning Commission Meeting for February 17, 2026 will be held at City Hall in City Council Chambers at 6:00 PM and as a Virtual Meeting using Webex, an audio/video conferencing system as an electronic means of communication. The public is welcome to attend. See participation information below.

PUBLIC PARTICIPATION INFORMATION

City of Dover Planning Commission Meeting of February 17, 2026 at 6:00 PM

Join By Phone: Dial +1-650-479-3208
Access Code: 253 575 64910
Password from Phones: 3683772

Join Online: https://bit.ly/PCMeeting02172026
Webinar Number: 2535 756 4910
Webinar Password: DoverPC

If you are new to Webex, get the app now at https://www.webex.com/ to be ready when the meeting starts. For problems accessing the meeting, please call the Planning Office at (302) 736-7196.

CALL TO ORDER

PLEDGE OF ALLEGIANCE

ROLL CALL

ADOPTION OF AGENDA

APPROVAL OF MINUTES

  • 1.Adoption of Meeting Minutes of January 20, 2026

1

Paj 2

PLANNING COMMISSION - February 17, 2026 PAGE 2

COMMUNICATIONS & REPORTS

Meeting Reminder: The next Planning Commission regular meeting date is Monday, March 16, 2026.

Update on City Council Actions

Department of Planning & Inspections Updates

OPENING REMARKS CONCERNING MEETING PROCEDURES FOR APPLICATIONS

OLD BUSINESS

Request for Extension of Planning Commission Approval

NEW APPLICATIONS

  • 2.AX-26-01 Lands of Fuller at 7 Nixon Ln - Public Hearing and Review for Recommendation to City Council for an Annexation Request and Rezoning Request for a parcel of land totaling 41,526 SF+/- (0.9533 acres +/-) located at 7 Nixon Lane. The property is currently zoned RS-1 (Residential Single Family Zone) in Kent County. The proposed Zoning is R-8 (One Family Residence Zone). The property is located on the east side of Nixon Lane slightly north of North Little Creek Road. The annexation category according to Dover’s 2019 Comprehensive Plan is Category 1: High Priority Annexation Area and the land use designation is Residential Medium Density. The property owner is Lupe N. Fuller. Property Address: 7 Nixon Lane. Tax Parcel: ED-00-068.19-01-28.00-000. Proposed Council District 3. Ordinance #2025-23. The First Reading of this Annexation Request was completed on December 8, 2025 by City Council. Public Hearing before the Planning Commission is scheduled for February 17, 2026 and City Council on March 9, 2026.
  • 3.AX-26-02 Lands of United Worldwide Express, LLC at 1624 North Little Creek Rd and Adjacent Two Parcels - Public Hearing and Review for Recommendation to City Council for an Annexation Request and Rezoning Request for three parcels of land of 5.12 Acres +/-, 3.15 acres +/-, and 0.48 acres +/- located at 1624 North Little Creek Road and the two parcels to the south. The main parcel is currently zoned IL – Limited Industrial Zone and RMH – Residential Manufactured Home Zone in Kent County. The other two parcels are currently zoned RMH – Residential Manufactured Home Zone in Kent County. The proposed Zoning for all parcels is IPM (Industrial Park Manufacturing Zone) and subject to the AEOZ (Airport Environs Overlay Zone): APZ II - Accident Potential Zone II. The properties are located on the south side of North Little Creek Road and adjacent to State Route 1. The annexation category according to Dover’s 2019 Comprehensive Plan is Category 1: High Priority Annexation Area and the land use designation is Office and Office Park.The property owner is United Worldwide Express, LLC. Property Addresses: 1624 North Little Creek Rd and two unaddressed parcels. Tax Parcels: ED-00-068.20-01-15.00-000, ED-00-077.00-01-07.00-000, and ED-00-077.00-01- 07.01-000. Proposed Council District 2. Ordinance #2025-24.The First Reading of this Annexation Request was completed on December 8, 2025 by City Council. Public Hearing before the Planning Commission is scheduled for February 17, 2026 and City Council on March 9, 2026.

2

Paj 3

PLANNING COMMISSION - February 17, 2026 PAGE 3

  • 4.Z-26-01 Lands of United Worldwide Express, LLC at 1600 North Little Creek Rd and Adjacent Parcel at 0.509 AC North Little Creek Road – Public Hearing and Review for Recommendation to City Council of Rezoning Request for the two parcels of land located at 1600 North Little Creek Road consisting of 1.77 acres +/- and the adjacent parcel to the east consisting of 0.52 acres +/-. The properties are zoned C-PO (Commercial and Professional Office Zone) and subject to the AEOZ (Airport Environs Overlay Zone): APZ II - Accident Potential Zone II. The proposed Zoning for both properties is IPM (Industrial Park Manufacturing Zone) and subject to the AEOZ (Airport Environs Overlay Zone): APZ II - Accident Potential Zone II. The properties are located on the south side of North Little Creek Road between Fairfax Lane and State Route 1. The owner of both parcels is United Worldwide Express, LLC. Property Addresses: 1600 North Little Creek Rd and one unaddressed parcel referenced as 0.509 AC North Little Creek Road. Tax Parcels: ED-05-068.20-01-61.00-000 and ED-05-068.20-01-62.00-000. Council District 2. Ordinance #2026-07. The First Reading of this Proposed Ordinance was completed on January 28, 2026. Public Hearing before the Planning Commission is to be scheduled for February 17, 2026 and the Public Hearing before the City Council on March 9, 2026.
  • 5.C-26-01 Bay Pointe Apartments (One Building Concept) at 1100 Bay Road - Public Hearing and Review of a Conditional Use Site Plan Application to permit the construction of one Multiple Dwelling-Unit (Apartment) Building as a three-story 59,313 SF building with 54 apartment units and associated site improvements. The proposed Apartment building requires Conditional Use review in the C-4 zoning district. Previously, three existing lots were consolidated into one parcel of total 3.302 +/- acres and are zoned C-4 (Highway Commercial Zone). The property is located on the southwest side of Bay Road at the intersection with Lafferty Lane. The owner of record is Patel Hospitality Properties, LLC. Property Address: 1100 Bay Road. Tax Parcel Number: ED-05-086.00-01-20.00-000. Council District 2. For Consideration: Active Recreation Plan. Previous Application C-21-04 Bay Pointe Apartments (One-Building Concept) was approved by the Planning Commission in May 2021 and an Extension in May 2023 with Final Plan Approval of June 27, 2023; the plan has expired.

NEW BUSINESS

PUBLIC COMMENTS OPPORTUNITY

ADJOURN

Posted Agenda: February 6, 2026

THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING

3

Paj 4

Item 1.

CITY OF DOVER PLANNING COMMISSION

January 20, 2026

The Meeting of the City of Dover Planning Commission was held on Tuesday, January 20, 2025, at 6:00 PM as an In-Person Meeting and also using the phone/videoconferencing system Webex. The Meeting Session was conducted with Chair Mr. Witham presiding. Members present were Mr. Lewis, Mr. Roach (virtual), Mrs. Maucher, Dr. Jones, Mr. Reaves (virtual), Mrs. Welsh (virtual – arrived at 7:00 PM), and Mr. Witham.

Staff members present were Mrs. Dawn Melson-Williams, Ms. Sharon Duca, Mr. Jason Lyon and Mrs. Kristen Mullaney.

APPROVAL OF AGENDA

Mrs. Maucher moved to approve the Agenda as presented, seconded by Dr. Jones and the motion was carried 6-0.

APPROVAL OF MEETING MINUTES OF DECEMBER 15, 2025

Mrs. Maucher moved to approve the Planning Commission Meeting Minutes of December 15, 2025, seconded by Mr. Lewis and the motion was carried 6-0.

COMMUNICATIONS & REPORTS

Mrs. Melson-Williams stated that the next Planning Commission regular meeting is scheduled for Tuesday, February 17, 2026. Monday is a holiday so your meeting will move to that Tuesday. She will let the Commission know that we do have five applications that have been filed for that evening and if there is no objection, she is recommending that we start that meeting at 6PM rather than 7PM. If that seems amenable to the Planning Commission by consensus, we will move forward with that timeframe. (There was no objection.)

Mr. Witham asked if there was any procedure in determining how many applications we can receive for one meeting. Responding to Mr. Witham, Mrs. Melson-Williams stated that there is not by Code. We have kind of balanced the complexity and number of applications when making a decision to either start earlier or split into two meetings. With the applications this evening, we felt we could get through if we started an hour earlier. Same thing would be true for our February meeting time. When you get into more than six and pushing eight, then we tend to split the Planning Commission Meeting into either two sessions or two meeting nights. It is a balancing act. The types of applications that we have for February are different than the combination that we have this evening. So, she thinks it’s reasonable that we could get through five if you wanted to start at 6 PM that evening.

Mrs. Melson-Williams provided an update on the regular City Council and various Committee meetings held on January 12 & 13, 2026.

Mrs. Melson-Williams stated that we have finalized your Schedule of Deadlines and Meetings for 2026. A final version of that was included in your meeting packet so you can mark your calendar for the Planning Commission meetings. They continue to be on the third Monday of each month unless that Monday happens to be a holiday and then it moves one day.

1
4

Paj 5

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS

Mrs. Melson-Williams presented the audience information on policies and procedures for the In- Person Meeting and Virtual Meeting using the Webex system.

OLD BUSINESS

Requests for Extensions of Planning Commission Approval: None

NEW APPLICATIONS

S-26-01 – Bayhealth Medical Center, Inc. - Kent Campus: Master Plan Phases 1-3 – Public Hearing and Review of the Site Development Master Plan and Parcel Consolidation Plan for the Bayhealth Medical Center – Kent Campus. The Master Plan outlines three (3) phases (with subphases) of construction as follows: Phase 1A – Emergency Department 2-story Expansion (Overbuild) and Central Services Building 6,000 SF Addition; Phase 1B - Bed Tower 6-story Overbuild; Phase 2A – New 5-story Parking Garage (500 spaces) and Main Entry Addition with Drop-off Area; Phase 2B – Demolition of Existing Parking Garage and a Podium Expansion as 3-story Surgical Pavilion; Phase 2C - Emergency Department 3-story Expansion; and Phase 3 - Demolition of Existing Legacy Building. The properties involved consist of a total land area of 22.55 acres ±. The properties are zoned IO (Institutional and Office Zone) and partially subject to the SWPOZ (Source Water Protection Overlay Zone). The project is generally located in the block created by South State Street, Hope Street, South Governors Avenue, and South Street with additional project area located on the north side of South Street. The main property address is 640 South State Street. The owner of record is Bayhealth Medical Center Inc. Tax Parcels: ED-05-077.13-01-52.00-000, ED-05-077.13-01-48.00-000, ED-05-077.13-01-18.00- 000, ED- 05-077.13-01-18.01-000, ED-05-077.13-02-01.00-000, ED-05-077.13-01-02.00-000, and ED- 05-077.13-02-12.00-000. Council District 2. Waiver Request: Reduction of Bicycle Parking Requirement, For Consideration: Parking Adequacy Statement/Reduction of Parking Requirement. The Board of Adjustment on October 15, 2025 granted approval of variances for the front yard setback and to allow a building height of 175 feet (V-25-05).

Representatives: Mr. Terry Murphy, President & CEO of Bayhealth; Mr. Gregory Moore, Becker Morgan Group; Mr. John Paradee, Brockstedt, Mandalas, Federico LLC

Mrs. Melson-Williams stated that this is a Site Development Master Plan that is for the Bayhealth Medical Center, the Kent Campus here in Dover. The image on the screen shows the hospital block. The main address for the hospital is 640 S. State Street and the property is zoned IO (Institutional and Office Zone) and there is a portion that is subject to the SWPOZ (Source Water Protection Overlay Zone). The hospital brings to us this evening, a Master Plan of a series of three phases with subphases that we will learn more about for construction of various additions, overbuilds, and new buildings at the site. The project primarily focuses on what we call the main block of the hospital. As noted, this is the block that is bounded by S. State Street that is at the bottom of the screen, South Street which is on the right, Hope Street which is on the left, and at the top of the screen is S. Governors Avenue. Additionally, there are adjoining parking lot areas on the north side of South Street is the large parking lot there called the South Street Parking Lot and also the Central Services Building that connects to the main hospital

2
5

Paj 6

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

block via the overhead bridge. There is a Hope Street Parking Lot and also to the east of S. State Street to the bottom of the page is the Scull Parking Lot that serves the hospital’s main campus as well the Surgery Center Building and Day Care facility that are also on that property. Tonight, in looking at a Master Plan, the Planning Commission is presented a concept of what these various phases will be and then each phase ultimately would have to go through a process for an Administrative Site Plan Review where there is a much more detailed presentation on the specifics of that phase. Quickly, Phase 1A involves the Emergency Department as a two-story expansion which is an overbuild and then an addition to the Central Services Building that is shown on the screen. Phase 1B is the bed tower six-story overbuild. It is on top of the existing Podium Building. Phase 2A is a new five-story Parking Garage to consist of 500 spaces and a new kind of main entry addition. The new parking garage facility is the box you see at the lower part of the screen there at the corner of S. State Street and South Street. Phase 2B would be the demolition of the existing parking garage and then an expansion in its place. Phase 2C is another expansion to the Emergency Department; again, kind of on the west side of the building. Phase 3 would be the demolition of what they call the existing Legacy Buildings. In this image, that’s the area kind of shown in the greenish color. For this project, we overall look at general parking for the overall hospital. The parking is based on a square footage calculation of 1 parking space per 300 square feet of floor area. There are portions of the Code which would require a minimum of at least one parking space per three beds and that’s clearly satisfied in them meeting a parking requirement based on floor area. They did present a narrative related to parking and the Planning Staff has additionally focused on parking compliance by noting that because this project is within the Downtown Redevelopment Target Area, there is no parking requirement based on use and that’s the bed use calculation. However, being located in that Target Area also makes them eligible for a parking reduction of 20% and with that, their parking proposal to include just over 1,200 surface parking spaces and a garage of over 500 spaces would meet their parking requirements. Additionally, loading spaces are provided at the Central Services Building as they have a centralized intake process. With parking, our Code requires a bicycle parking requirement. They have submitted a Waiver Request to reduce that parking requirement. If you do the math based on vehicle spaces, it would require 85 parking spaces for bicycles and they are asking to reduce that to the currently provided number of 38. Additionally, the Planning Office has provided generalized comments. For a number of the details of the Plan, Staff has noted that the Administrative Site Plan process will require a number of those things to be submitted at that time. The Planning Office is recommending approval of the bicycle parking reduction. They are noting that their project will be making changes to vehicular and pedestrian connections for the hospital and they want to make sure that as each phase progresses, that the appropriate accessible roots and ramps are in place to satisfy the movement of both vehicles and pedestrians throughout the campus. Stormwater management has always been a concern in this area related to nearby drainage systems; so, that will be something that they will be working through as part of future plan reviews. We have also noted that now is the best time to plan for any kind of EV charging. It is her understanding that they do have some already on their overall campus. The Development Advisory Committee Report continues with comments from our various other agencies and they are included by reference. That includes the Departments of Public Works and Water/Wastewater, the Fire Marshal’s Office, from DelDOT, the Kent Conservation District, and the Dover/Kent County MPO.

Mr. Murphy stated that they will try and be brief tonight. They know that there are others behind

3
6

Paj 7

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

us. We are going to do just a brief introduction and really talk about the very important reasons why we are here in front of you and the future of Dover in Kent County healthcare. We are going to go over a little bit of the history of the Kent Campus in the current state and then speak very specifically about the Historic District of the City of Dover and then talk about our Master Facility Plan with some closing thoughts. Again, they will be mindful of time. He has been the Chief Executive of Bayhealth since 2009. Again, he has been working at Bayhealth since 2001. For the 5,000 team members that we have, we work very hard every day to take care of this community and we take it very seriously; it’s part of our mission. The one thing that is important for him to share is that planning for us is uniquely different. We have to be prepared for 10 or 20 years down the road just by the nature of what we do in healthcare and caring for people. It’s extremely complex in these spaces and buildings and how we do it. It’s ever changing, so we put a lot of time and effort into planning with our own Planning Committee. So, we have done a lot of work in the past months and years specifically that brings us here today. First, he wants to share a little bit about what we need to grow. This is from a recent study in JAMA to talk about the need for hospital bed space for people that will be hospitalized. No one needs to raise their hand, but if you were born between 1946 and 1964, you are referred to as a baby boomer. The “boomer” is the important word because of the birth rate that occurred during that time. Unfortunately, what we have in front of us here is that the baby boomers are now aging. You figure 1946 to today. We are caring for baby boomers and that requires of a lot of healthcare, not less healthcare. What this shows in the study by researchers at JAMA is that the projected occupancy rate prior to COVID is going to go from less than 64% in hospitals across the U.S. to a projected occupancy in 2035 of 85%. 85% occupancy is not a good thing in healthcare because patients come and go. In fact, during the recent flu pandemic and epidemic that’s been going on post-Thanksgiving and Christmas at our hospitals, we were over 90% occupied. So what does that mean? ED over-crowding is not really an ED issue; it’s really about having beds for patients that are sick enough to be admitted to a bed and get them to a bed. So we need beds in a big way to prepare for the aging baby boomers. The number of hospitalizations in the U.S. is going to go from 36 million to 40 million by 2035. It is something that we think about because it’s coming and we need to think to be able to care for the community. The next slide shows where Delaware is a little bit unique by decades. On the left on the gray is Delaware’s percent of population over the age of 65 and on the right is the U.S. percent of population that’s over the age of 65. So what is unique to Delaware is on the bottom right-hand side. If there’s one thing you take away from this, Delaware ranks 5th in the Nation for percent of total population over the age of 65. This just means our work is just that much more important in order to get prepared for the aging baby boomers who are a large percent in Kent and Sussex counties as a percent of our total population. The next slide shows on the blue line the number of beds at the Kent Campus over the decades. The reason we are here are the last three decades as we are looking to add close to 100 beds on our Campus. The orange is really the growth of Kent County. As you look at the growth of Kent County, you see a similar growth in the number of beds needed to care for a growing population. So it’s not just the aging population; it’s the growing population that we face. He mentioned that they do a lot of planning. The one thing to take away is on the upper right. We believe by 2032 that we are going to need to have close to another 100 beds to carefully care for the community in an appropriate way. The challenge that they have on our Kent Campus is how do we expand the number of beds and how do we improve the Emergency Room and the flow from the Emergency Room? Right now, we have 50 rooms that are semi-private. He doesn’t know how many of you go into a hotel and say “whoever comes through that door next, I want to room with

4
7

Paj 8

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

tonight.” But semi-private rooms aren’t really the way to go in health care. It takes away family members; it’s private thing. Like we have in Sussex, on the Kent Campus, we want to move to all private rooms for the health care that we deliver for the patients and their family members. We need to modernize our surgical in what’s known as interventional platforms for the future. We want to have work spaces that attract the best and the brightest physicians, nurses and technicians. We need to replace an aging infrastructure. So when we talk about Legacy Buildings, there are buildings that have been there for a long time that really won’t function in health care in the future nor today and those would eventually come down. We want to be more efficient and we also want to stop hospital sprawl. So this Plan actually does those things and the way that we are able to do that is, we’ve taken a lot of time in the planning process to really re- imagine, like we did in our Sussex Campus, how to do this stuff well. The one thing is that we are going to move to a more vertical Campus. If any of you have ever come into the Kent Campus in the current entrance and you need to go to the Outpatient, you go onto a long walk or if you are on this tower or the next tower. There is a horizontal growth that has occurred in our history and we want to move people and materials vertically where it’s more efficient, less movement and easier to move things through elevators front and back. We want to move more vertical. The design focus is how to improve our ED experience and our flow and that’s the first part of our phase of our project. He mentioned moving to all private rooms and they also what to have technology in our rooms for the patient and their families to increase transparency and communication in the care that also involves the family. We believe this is a great way to improve patient outcomes as well. This project is for Bayhealth as an organization, the largest re- investment we have ever made. This is larger than what we’ve done at Sussex Campus. It is a large re-investment into the community. What we do is very complex and it’s very unique. What he would also say is that we’ve put a lot of time and effort into thinking how we will grow and be prepared for the future. We think this would be a great facility that will attract the best and the brightest and we look forward to your support and are open to questions. At this point, he is going to turn it over to Mr. Moore from the Becker Morgan Group who will get into a little bit more of the details.

Mr. Moore stated that we are going to talk a little bit about the current state of the Campus and where it came from and then we will go directly into the Master Plan and show you some images. Before he does that, he wants to make clear that we have no issues with the DAC comments from the Report. We think it’s a well-developed Report as Mrs. Melson-Williams always does and we conform to everything and have no issues. The second thing he wants to start with is that they had a number of outreach meetings to our neighbors in our regional area as well as the Friends of Old Dover. We had three different meetings with these groups. In fact, we had our neighbor meetings with one in the evening so that they made sure everybody could attend. We had over 30 people attend. We want to be a good community member and make sure they understand what we are doing and how we are doing it. This is actually an image showing the 1927 opening of the Kent Campus which was shown there in red. That is the actual building. You can see how rural it is. The Bryan House that is on this property today is not even there. The Frear House happens to be and there are a couple of other properties. You will notice that Governors Avenue wasn’t even extended over Route 13; so, this is quite a different time. The total population of the County was about 30,000 people. Notice how rural the area was around the hospital and we think that’s when Dover was growing and continues to grow. The next slide shows that between 1927 and 1973 there were a number of additions to the hospital around the

5
8

Paj 9

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

Legacy Building from 1927 and the population is now 86,000 pushing towards 90,000. There is a consistent growth in our population and we were growing at the same time. You can see buildings getting built along Hope Street around that main building that was built in 1927. In 1986 to 1992, we had other expansions. You can see in blue, the 1986 Building which survives today and will survive the Master Plan. The population is up to 111,000 and a number of buildings. The old building is completely surrounded with new expansions. That continues past 1992. He will note that that 1986 Building originally was built as a three story building and we did an overbuild of three stories to make it the six stories that it is today. We understand how to do these overbuilds; we’ve done it, we’ve managed it, and we will do that again as part of the progress of Phase 1. The next slide shows the 2010 Expansion and it was large. We sat here in 2006 before this very body getting a Master Plan approval. That planning started in 2006 and the buildings were built in 2010. You can see as Mrs. Melson-Williams outlined the CSB Building which is the service building to the right with the bridge crossing South Street. That will all survive. That’s where materials come into the hospital, where our loading zones are, our waste goes through there and there is also utilities that serve the building in terms of heating, electrical, and supply. The 2010 building that is in light blue is still there. The main entrance of the hospital is still there on that version and you can see everything to the left is now a different color. We call that the legacy side of the building. The next slide shows that populations at that time had approached 190,000 and that is the last expansion that we did. You can see that this is very much the same with exception that you can see everything to the left in red that we call legacy. Most of those buildings are 45-50 years or older. They present a problem to us because modern healthcare Codes have changed significantly. Specially, floor to ceiling heights have to be larger to have patients. They have to be larger for surgeries and those buildings don’t meet those and we have to expand in other areas so that we can actually meet those modern healthcare Codes that we have to deal with. We will talk about the Legacy Buildings later but notice 1986 and 2004 on that 1986 Building. It was 2004 when we added three stories of beds on top of that building, doing that while the 1986 Building was in service and that is what we will have to do again. Mr. Murphy mentioned the sprawl. He mentioned coming into the hospital in the main entrance in blue on the screen; you can see that it’s circled. You see the six story tower addition that we are going to show you in a minute and you see the parking garage in the back on the far right side. But when you come in, you may be in beds that are in the current four stories, but there are three other locations that beds are to the left and one of them is over 424 feet from the main entrance. We are having complaints from our patients and providers that they have too far to go. It’s confusing. We don’t know which elevator to go to; we don’t know which bed tower to go to. We are trying to stop that sprawl by making this Master Plan change today. Let’s talk about where we are relative to the City and our context. The tan is actually the City of Dover’s Historic District and the red star is actually where we are going to build the tower and the blue is the property that is part of this application from Bayhealth. Notice that we are not in the Historic District, but we are very close. A portion of our property is in it and he will show us that as they expand. The next slide shows a red line and that is the Historic District line. You can see the blue is our property boundaries that we are presenting tonight. You can see that bridge crossing South Street right in the center, S. Governors Avenue to the top, and S. State Street to the bottom. But we are not in the Historic District. We do own a building that is and that is the Professional Office Building on S. State Street. We are very aware of that Historic District and have been before that Commission as we have made expansions and modernized that building with windows and such. So we are very respectful of that Historic District. You have seen

6
9

Paj 10

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

surprisingly that during his entire life, there have been very few parking garages in Dover and now you have actually approved three others in addition to the one you are seeing tonight. One of those is Legislative Hall on the far right, the Downtown Dover Mobility Center and the Kent County Family Court House. All three of them are in the Historic District and we are just on the edge and that sets us to be a little bit different. The next slide shows the Dover Mobility Center which is under construction and this is the side view that you see from the sides, not from the street and notice that it is about 58 feet tall in total and there are parts of it that are about 55 feet in height. The next slide shows from the Governors Avenue side; again, the 58 foot version. He points that out because he wants you to get an idea of the scale of our project compared to these because you’ve seen these already. There were two historic buildings that were in the Historic District that were torn down as part of the project. The next slide shows the rendering of the Court House. The Court House is by itself on the front and then the back is the Parking Garage. That building is about 58 feet tall; it’s close to Governors Avenue and it is in the Historic District. It went through the Historic District Commission and then came here to this body for approval. There were four buildings that were demolished as part of that construction. This is the most recent which is just starting construction. It’s hard to see but it’s just getting underway at Legislative Hall and the parking garage is there to the left. You are experienced with parking garages. You are experienced with some demolition that has been partaken to allow the parking garages to be there.

The next slide shows their Master Plan and the specifics of what we are doing. The next slide shows Phase 1. Our Phase 1 right in the center is the tower overbuild and that’s where we are erecting six stories of what we call our “bed tower” to add these many bed rooms that we need. Part of that is demand because of population growth and as Mr. Murphy said, the aging population but the other part that we have to account for is the double rooms that we have to turn to single rooms. To the left you can see the Legacy Buildings; that’s the older buildings that are over 45 years old. He will refer to them in a bit. In the green, you will see the circle. That is the Emergency Department overbuild and a new Emergency Room entrance and expansion providing more seating area, providing more security and a large area so that there’s more patient rooms for Emergency so that we don’t have the problems that we are having today with backup times. Then a small addition on the right side next to the bridge that is not for patients or people, it is a utility building that is part of the CSB and electrical supply and services are the main use of that building. The next slide shows the new entrance that is part of this phase to the Emergency Department with the enhancements that he has pointed out; more waiting area in the front, more security and you can see that it will be done first. It will be the very first part of Phase 1 and in this picture, you can see the Parking Garage in the back that we will talk about later. The next slide shows the other side of the Campus; the main entrance to the hospital will remain. We will build six stories of the bed tower above the existing Podium that Mrs. Melson- Williams referenced. You can see the demarking red line where those four stories turn to ten by going six above it and all of that is bed tower. The main entrance stays the same. The build is over top of the four stories and he can tell you that the building was planned for those extra six stories. We designed it for ten and now we are finally erecting that building on that Podium in 2010. Notice that the Cancer Center that you may have been in is remaining intact. That is part of that first four-story Podium Building. That will remain and it will be the beds above. Phase 2 is in parts. At the bottom you can see a new parking garage and that parking garage is a four-stories with a little over 500 total spaces. The bed tower will actually be there, and the Emergency

7
10

Paj 11

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

Department expansion will be there, and the new Emergency Department entrance will be there. On the far right side which is green, you can see another Podium expansion and that Podium expansion is going to be the surgical suite. There is going to be three stories of that building allowing us to expand our surgical which is over in the Legacy Buildings now. That surgical area will be more modern, it will be more technologically savvy, and it will provide healthcare and surgery at a higher level. As Bayhealth has grown and the population has grown, we are providing more surgeries. We are providing more different types of surgeries and adding specialties that require more surgical rooms so that we can do that. You can almost see the bed towers in the center in that light blue; you can see two elevators on each side of that. One of them is for patients and the other is for service and emergencies but we are simplifying the vertical move up to the towers and making it simpler for people to understand. We are also bringing the Emergency Department much closer to the tower and the beds so that when you go to the Emergency Room and need to go to the beds if you need to go to a room, you can go quickly right up the elevators. But that is also true of our staff and our doctors; it is efficient for them to get there. If you get surgery and you have to go to the beds, there is an elevator right next to you and it consolidates that and goes vertical as opposed to the “sprawl” that we have today which is hurting us in efficiency. You will also note that in the center of that Plan we have a building that is going to be part of the main entrance that will allow you to come into the Parking Garage at the bottom at the page in red and be able to walk into the main entrance of the hospital totally under cover and in a new building pavilion that allows you access to those elevators. Another couple things to note; we are removing the entrance off of State Street. That is the main entrance to the building. We are leaving the entrance in the same location on the current Podium, but we believe that by moving that entrance off of State Street, we are going to help improve traffic on State Street because there are a number of issues there as it relates to Holy Cross and a lot of different movements in different directions. We are going to maintain our main entrances off of South Street to the hospital. If you are coming to the hospital, you can use either Governors Avenue or State Street to get there. They think that is strong traffic issues to allow people to get to the hospital from multiple roads. You are going to be able to pull in, drop off, and then pull right into the parking garage and walk under cover back to the main entrance. That is modern health care. We have done a lot of studying; we have been studying this for years. That location for a parking garage is strategic and important. It is the closest that we can get that number of spots to the main entrance so that our patients and our visitors don’t have to walk too far. We looked at putting it over on the other side of South Street but then you would have to cross a road and then you would have probably about 400-500 more feet. We can’t put it in the Legacy Building because everything in that Legacy Building has to remain in service until we can move it. We can’t do that until we affect these changes, whether it be surgery or whether it be the ED expansion. The other thing that we are going to be doing is moving out-patient over to the Blue Hen Mall. We have a large presence at the Blue Hen Mall. We just made a major expansion there and outpatient services are going to be more at the Blue Hen Mall which is going to reduce traffic at this site. This is going to be more of an acute hospital; a bed hospital with an additional 100 beds and that is our strategy. We are also going to be able to take some of our Staff over to the Blue Hen Mall so that we don’t have a lot of staff here. When I say “staff” I mean functions like possibly financial, Human Resources, etc. that don’t have to be in a hospital. They can actually be doing their functions off-site and we can concentrate on this site being the acute hospital and that will help us reduce traffic. The next slide shows the view in 3-D architectural from South Street. Pretend like you are standing inside on South Street and you are

8
11

Paj 12

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

looking at the existing hospital. That glass that’s above the Bayhealth insignia on the right is the Cancer Center. That remains and the main entrance stays the same. You will be able to drive in off of South Street, drive around that loop, go into the parking garage which is to the left and then walk back under cover into the main entrance. That loop will provide for allowing you to drop-off and allowing you to continue to the parking garage if you wish. The next slide shows the view looking from the north along S. State Street. That street there is South Street and you can see the Podium Tower, the six-story Bed Tower that he referred to in the background, and then the Parking Garage to the left and then you can look down S. State Street. Notice we positioned it so that we can do nice landscaping and gardens along the edge, both on South Street and S. State Street to break that down. Our heights are 36 feet 10 inches for four stories and we are slightly higher than that at our elevator and we are slightly higher than that for our canopy which we have solar panels on. The next slide shows that in a little bit of a different view. This is coming from the south. The 1986 building that had the three story overbuild is to your left, then the parking garage there. You can see the 36 feet and the 44 foot elevations. We tried to make that as low as we could so that it had a residential scale and we didn’t change the scale of the area. The next slide shows a closer view. Notice that the vehicular entrance is gone and it becomes garden and it becomes a walkway into the entrance of the hospital. The Parking Garage is landscaped along S. State Street to give a little bit of a softer image on S. State Street. You can see the Podium in the back with the new six stories above it. The next slide shows a vision of seeing all three over builds in one on S. Governors Avenue. It is actually a very difficult option to see because of how large the building is. On the back side, you see the Phase 1 Bed Tower and then Phase 1 on the right side would be the ED overbuild which is the entire Emergency Department giving us much more space so that when you come in you don’t have to sit and wait. You can actually get to a location where a doctor can see you in the Emergency Department and then they can get you up into the tower if you have to get a bed. That should help us reduce those wait times. On the far left hand side along where the light is at S. Governors Avenue and the Bayhealth insignia, that is the Surgical Suite. There is going to be surgery and a pharmacy in those areas, again, located right under the tower so that efficiency for our staff and efficiency for movement throughout the building is accommodated. The next slide shows moving down a little past the light and past South Street. The building to your left behind that red car is actually the CSB. That is where the functional things happen. That is where we bring in our materials. They go over that bridge behind the trees and they get into the building. All of that will remain and you can see those three-story overbuilds on S. Governors Avenue, which again are the Surgical Suite as well as the ED overbuild and the tower in the back. The next slide shows Phase 3. Phase 3 is basically when they will have all of these things done and they are then able to remove those Legacy Buildings that we can’t renovate. When we remove them, we believe that will be ten years from now. We have to do this slowly; these are long term construction projects. Once we remove them, some of that will go to Blue Hen Mall and some of that will go into the new expansion areas here. Once that’s done, we will be back here before the Commission as to what we are going to do with that space. But that will allow us to go the next ten years and the next ten years. Our philosophy is to stop the sprawl, go up, and utilize our property more affectively and don’t require people to walk such distances as we do today. The next slide shows Mr. John Paradee on the right; he is going to close for him. That is a 3-D image of what the campus will look like. The 1986 Building on the left, the parking garage to the bottom and the Podium and the bed tower to the top.

9
12

Paj 13

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

Mr. Paradee stated that he stands before the Commission tonight not just as an attorney who has been doing land use law for forty years in our community. He stands before you as a former Chair of the Board of Bayhealth. He will tell you that one of his proudest accomplishments during the time that he was on the Board was hiring Mr. Terry Murphy. Mr. Murphy has been a tremendous leader for this organization in delivering our vision for the quality of healthcare in Kent County. You heard Mr. Murphy and Mr. Moore talk about the importance of this project, not just to the hospital and its ability to deliver quality care at the highest level and comply with regulatory requirements, take advantage of technology, and deliver healthcare in the most efficient way possible. But this is important to this community and to all of central Delaware. We appreciate your time and focus tonight. What he handed out are the two leading cases on Site Plan approvals in Delaware. Oddly enough, one of them was decided in the City of Dover involving this very Commission back in 1994. It is referred to as the East Lake Partners Case. In that case, Judge Max Terry talked about the role of a Planning Commission like this is not legislative or discretionary like the City Council when it’s considering a Rezoning. It is called partly administerial and partly quasi-judicial. You have to look at the application and try to decide, does it meet the Code requirements or not? What this case stands for is that if you have a project before you that meets all Code requirements, your discretion is extremely limited. You can attach conditions of approval to address concerns that may alleviate health, safety, and welfare concerns but you can’t deny the project. That decision built on a case that was decided several years earlier called State ex rel. Daniel D. Rappa v. Buck Inco. Essentially it says the same thing, that when you are confronted with an application like this for a Site Plan or even a Master Site Plan Development your discretion is really, does this meet the Code requirements? We would respectfully submit to you that it does meet the Code requirements and there is no basis really in the Code to deny it. He would ask you more importantly beyond that legal standard is, think about what this means to the community. We have to build this expansion and we have to build it now. Our population is growing beyond control. We need 100 new beds and we need them quickly or this hospital will not be able to deliver the quality of care that we all deserve. In closing, he will remind you that this is very important not just to the hospital and not just to the City of Dover, but to all of Kent County and central Delaware. We appreciate your consideration.

Dr. Jones stated that in the plan she noticed that under the challenges, one was to ease the traffic is to obtain physicians, nurses and allied health professionals. In the larger scheme of things, is there a PR plan? She knows some people who work in that area and you are doing some things. But she is just wondering if you are around a lot of newcomers to Dover, the first thing you hear is “I have to go back to New York because there is this or there is not that” and of course she is a Delawarean so her response is a little different. Responding to Dr. Jones, Mr. Murphy stated that they are doing more for workforce development than most. We are paying for people to go to school to learn to be a CNA or a Tech so that they can have a job once they are done with that training program. We are now a teaching hospital and training physicians that we have had many that have stayed not only in Kent and Sussex, but have stayed in the State of Delaware to practice. Physicians, nurses, technologists; we are doing everything with every institution of higher education that we can do. It is important to also know that you want to have spaces for the professionals. When we redesigned the Sussex Campus, we asked the team members. What makes sense as a nurse in how you deliver care and what do you want right outside the room versus going to hunt and find? When you do those things well in facilities and with the

10
13

Paj 14

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

technology, you attract really good people and that is also what we are trying to accomplish with this project.

Dr. Jones stated that she doesn’t usually personalize but she wants to say this. Her mother was a nurse in one of those Legacy Buildings in about 1957 so she remembers what it looked like. Currently, she has a niece who is a very happy nurse at Bayhealth so she is going to share with her. Responding to Dr. Jones, Mr. Murphy stated that he wasn’t there but if he can ever do anything for her please let him know.

Dr. Jones stated that in the scheme of the new Site Plan, she didn’t hear much about security. Responding to Dr. Jones, Mr. Murphy stated that security in healthcare today is one of our biggest issues. As that new front entrance expands, we are going to really look at all of the safety and security systems that are out there today. We are open 24 hours a day and 7 days a week. We are reflective of society so we are open to everyone and we have to provide a safe and secure environment. We do that now but as things elevate and more things come to market, our plan primarily in the front entrance as well as the Emergency Department would be to elevate to make sure that we are keeping the things that can be harmful out and providing a safe place for people to work. That’s really important for our team members.

Mrs. Maucher questioned that with new Parking Garage, all access would be off of South Street, not S. State Street? Responding to Mrs. Maucher, Mr. Moore stated yes, we have two entrances off of South Street so that you can come in and then circle back out. The Emergency Department will still gain its access for ambulances over on the other side. But we believe that it’s a better traffic condition by using South Street as our main entrance and our exit. The other thing that he didn’t mention in the presentation is that they want a light at the location of South Street and S. State Street. DelDOT controls that, we have met with them and talked to them. We think that will actually improve traffic on S. State Street as well giving it a stop so that cars can get out of Holy Cross when they have functions.

Mrs. Maucher asked about a light at Hope Street on S. Governors Avenue. She walks that street and it’s a straight line from Wyoming Avenue to the next light at South Street. Responding to Mrs. Maucher, Mr. Moore stated that they have met with DelDOT to talk. We have been talking about a light at South Street and S. State Street. There is already one on S. Governors Avenue and that’s why we want it on both sides so that cars can come in and people that might be in trauma or whatever can actually have a light to protect them. We have not talked of one on S. Governors Avenue but we are starting our process with DelDOT. We have a lot of work to do with traffic and entrances. Even just to remove the entrance on S. State Street, there is a permit and a process that we have to go through to do that. We are doing that already so we will take consideration of that light to them as well.

Mrs. Maucher stated that she walks that frequently on S. Governors Avenue and it’s the fact that they can pick up speed from Wyoming Avenue down to South Street. The MPO noted that there is a high pedestrian accident rate in that area so that might be something for consideration. Responding to Mrs. Maucher, Mr. Moore stated that’s a good point. The other thing that is going to happen is, by taking out all of the outpatient facilities away as part of the Legacy Buildings and moving them to the outpatient facility at the Blue Hen Mall, that will reduce a lot of traffic to

11
14

Paj 15

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

our site so we think that will improve it as well.

Mrs. Maucher asked if that would include the Surgery Center on Scull Terrace or is that going to stay there? Responding to Mrs. Maucher, Mr. Murphy stated that we are not removing it as part of this. That’s one of the areas that we are looking at that would make sense to be out there eventually but that’s not part of this right now. Anything that is out-patient or any type of facility where they don’t need to be there for acute reasons, we are looking at how we can decamp and move it to an area that has great parking and was relatively inexpensive to get.

Mrs. Maucher stated that her last question is on timing. You said it was a ten-year plan. Responding to Mrs. Maucher, Mr. Moore stated that their timing is to move right into Phase 1 which is the Emergency Department. That overbuild of six-stories is going to take a long time; it’s going to take years. We believe that it will be five years away before we do the Parking Garage and Phase 2. We will have to be fully finished with our Phase 1 to do that. We already have contractors on board, we are already starting to schedule that and we are already working with our architects to do that. But we believe that it will take us ten years before we get to Phase 3. So, this is a long term plan. Remember the history, the last Master Plan was approved in 2006. Those buildings weren’t in service until 2010 and 2011; so, it took five to six years to get that and this is actually a tougher project.

Mr. Lewis stated thank you for the presentation. He always enjoys when we get a 99-year-old aerial photo as part of the presentation, but it was very comprehensive. Following up on what Dr. Jones was saying, we don’t hear about a project that comes here for a new apartment complex or the Dover 2030 Project without hearing the name Bayhealth. They are anticipating that some of your new employees will be populating some of these new apartments that we are getting. You mentioned 97 new beds by 2032. Is there an industry standard that hospitals nationwide go by? Like if you have X number of beds, that means you have X number of employees? Responding to Mr. Lewis, Mr. Murphy stated that it was a great question. Not necessarily. What he would say is our history, if you look at the number of employees, we are growing. For example, we’ve changed as a teaching hospital now since 2019; we employee a whole faculty. We employee people that take care of the residents and residency coordinators. The other thing that’s different is healthcare is changing. A lot of things are moving to outpatient; so, it’s just changed so much over time. A lot of the procedures that used to be done by surgery are now being done by interventional ways where there is not a surgical procedure. Which is better and shorter lengths of stay; so there is no true number. We do use a standard, but we are at 5,000. He doesn’t know what is was when he got here but we are going to continue to grow in order to meet the needs and do our healthcare well.

Mr. Witham opened a public hearing.

Mr. Stephen Loper – 76 Sackarackin Avenue Dover, DE 19901 Mr. Loper stated that the hospital is a good neighbor. They have been professional. He is close to the hospital. In short, he and his wife are in favor of all of the phases of this long-term project. They believe this project will have a positive impact on our community.

Dina Vendetti – President, Chamber of Commerce and 352 West Wind Drive Dover, DE

12
15

Paj 16

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

19901 Ms. Vendetti stated that she is not here just representing the Chamber of Commerce although that is her purpose for tonight, but she is also a resident of the City of Dover. She is here to speak absolutely in favor of the expansion at Bayhealth. There is a multitude of reasons that she thinks that were really outlined in the presentation. There are two things that she would like to zero in on. The first is that as a Chamber, part of our duty is to help this area to be a business friendly area. When we are talking about bringing businesses and companies to Central Delaware, it’s really important that the infrastructure can handle all of that and the hospital is part of that infrastructure. We have to have good healthcare in order to be competitive and in order to attract people to come to our area. As the population grows, which she thinks has been shown here this evening, the need for healthcare grows. We have an extremely high quality healthcare through Bayhealth here in central Delaware, but soon and maybe already, there is just not enough of it. This hospital expansion will enable that to grow and keep pace with the population and keep pace with the companies that would perhaps like to come here and do business. The second thing that she would like to call to your attention and this has been mentioned a couple of times this evening is that we are now a teaching hospital and that’s been a benefit that is a win. It’s a win for the residents who come here. It’s a win for the doctors who are serving as their mentors and their guides because in order to teach somebody how to be on the edge or the forefront of what’s happening, you have to be really good at it yourself. So that is a win for the doctors and all of that is a double win for the residents here in Central Delaware. In order to maintain that status, there has to be an infrastructure that will accommodate all of the technological advances and things that are happening in medicine. Currently, we are at the end of where our facility can handle that and we need to grow that. She thinks Mr. Murphy spoke to that in his presentation. So, for all of those reasons, we are in favor of the expansion.

Dr. Joseph Rubacky, III, D.O., FAAFP – Dover Family Physicians PA 1342 S. Governors Avenue Dr. Rubacky stated that he has been in practice at Bayhealth for 37 years and been involved in many of their projects. He is proud of the many things we have done. During my time here, we have seen tremendous growth not only in population served, but also in services. The culmination of that was the start of our teaching programs with three medical schools and starting multiple residency programs, which he was one of the ones who led to the development and start of these programs. So he thinks he can attest to that and the importance of those to the community. Someone asked about what we are doing to improve access. These teaching programs were developed specifically to improve access with the side effect of improving care. One of our biggest barriers to care right now is a divide and care where we are literally overwhelmed most days in our emergency room where we have patients double bunked in hallways and some people have extremely long wait times. The reason for that is just a backflow of the hospital. We don’t have enough admission beds. Right now, he made rounds teaching students today and he had patients that are double bunked in single bunk rooms. In addition to that, we have patients who are having transmissions of infectious diseases. He has two patients right now that picked up the flu from having roommates that they shouldn’t have had. We need to rapidly expand this facility and go to all single rooms and have enough rooms that we can actually care for our patients. One of the other questions had to deal with recruitment and retention of staff. There is nothing more demoralizing than not having the tools to care and do the job you want to do. For example, he has a patient right now that is 92 years old that got

13
16

Paj 17

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

admitted last night. She waited 12 hours in the ER to be seen with abdominal pain. The poor thing then finally got admitted, had to wait hours to get in a room and she is unfortunately dying and is in a double bunked room. The family is there with her at the bedside and they have no room or privacy. This is not the care that we want to provide for our loved ones, so we have a moral and ethical problem also. One of the things that he teaches is medical ethics. We have an ethical obligation to provide the best care and we also have an obligation to provide the care that we would want our mothers and fathers to receive. Right now, unfortunately, we’re not living up to that. We have the financial resources with our hospital and the leadership resources that you’ve just seen, to do what we need to do. There are a lot of communities that don’t have that so we don’t want to squander this opportunity; we need to move quickly on this. The need was there several years ago and the need is only going to get greater as the community expands. He gives his strongest recommendation to move forward with this post haste.

Mr. Witham asked if he is comfortable with this Master Development Plan in that the hospital will be able to conduct its activities in an efficient and careful manner to serve patients while this construction is going on. Responding to Mr. Witham, Mr. Rubacky stated yes he is. He can speak for it from personal experience because he was actually involved in the 2006 project intimately. It lead to the concept of the ten-story build because the vertical direction will make things much more efficient and it will be a much nicer environment for not only those working, but for all of the patients. He is very confident on that. Unfortunately, everyone inherently opposes changes, even good change and this is a good change building this. But it is going to change slightly the view and the dynamics of our Downtown community. We have to be realistic about that, but the need far outweighs any determinant that can occur with this expansion.

Mr. Witham stated that he assumes the hospital has made careful planning to keep its activities ongoing sufficiently enough to serve the needs of the people in Kent County with all of this construction. Responding to Mr. Witham, Mr. Rubacky stated yes, it has and he can speak from his time on the Board also. A couple things, one is financial. The financial planning that this hospital as done and has done for decades is superior to just about any institution and to be able to maintain the financial stability to be able to do this with double A bond rating. Along with that, one of the things back when we initially merged with Milford and created Bayhealth, we looked at the possibility of doing a green site hospital outside of Dover and in between Milford and Dover, way back as part of our due diligence before we did the expansion in Milford. One of the things that came out of the planning when we met with national planners was that this site that we currently have will meet the needs going forward in the community if properly developed for at least 100 years. This plan is part of the fulfillment of that. When this gets completed in 5 or 6 years, you are looking at another 40-50 years life span on this. It will be fulfilling the needs of our children when they start having high health care needs. He wasn’t born here but one of his children was born here by the way.

Ms. Diane Laird – Downtown Dover Partnership at 101 W Loockerman Street Dover, DE 19901 Ms. Laird stated that she is the Executive Director of the Downtown Dover Partnership. She doesn’t live here and she wasn’t born here in the hospital but she has spent quite a bit of time in Dover having worked for the Partnership in the last 7.5 years and spent 20 years prior to that working with the Downtown Dover organizations. What she has admired about Dover is the

14
17

Paj 18

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

proactive planning stance versus reactive. There are a couple of things that she just likes to be enthusiastically in support of. Briefly she will speak but she’s enthusiastically in support of these expansion plans. Two points that she would like to make. One has to do with transformation of a community and the other is reinforcing the adequacy of medical facilities in the community as it grows. The first point is transformation. Talk about transformation; it kind of is proactive or reactive, inside out or outside in. This community that she has been thrilled to be a part of and proud to be a part of is transforming from the inside out. “Outside in” means the forces outward are telling it how it develops; that is part of this. But “inside out” is the community saying how do we respond to the needs and plan proactively to address them appropriately. The simultaneous completion of Master Plans for Downtown Dover that have been undertaken over the past several years include anchor institutions, not only Bayhealth but the DDP, DSU, and the Biggs Museum. These four anchor institutions have done this simultaneously which again, shows a strong philosophy here in this community to proactively plan to transform from the “inside out”. This bodes well for the future of the city and in fact, these plans including Bayhealth’s expansion are expected to be in place for a city that is considered to be viable, sustainable, and livable for years ahead. The quality and accessibility of healthcare is critical for this community. Certainly, she wants to also emphasize the need for adequacy of the current medical facility. It is not adequate at present and we know there is anticipated growth. She just wants to bring home the point that what she is working with daily which is plans for 120 units on S. Governors Avenue that could be potentially 200 plus residents in the near term. We anticipate probably breaking ground within the next year so that 2.5 years or so from now, there could be an additional 200- 300 residents. There are other projects underway. The Old Post is bringing about 42 new apartments which again are close to another 100 people potentially. We have a goal, the Downtown Dover Partnership, in its Master Plan alone of a projected 2,000 new residents in Downtown alone. That’s not speaking of the City overall or the County. That again, is accomplished through our 120 apartment units and the Old Post’s 42 units. We are well on our way to those 2,000 new residents projected in a short matter of time. She wants to applaud Bayhealth for its proactive stance and again, emphasize that this is not alone. DSU and Bayhealth and the Biggs Museum, we are all planning. This is great philosophy for a City and she is proud to be part of it.

Mr. Zach Prebula – Kent Economic Partnership at 555 Bay Road Dover, DE 19901 Mr. Prebula stated that he is the Director of Operations for the Kent Economic Partnership and we are the economic development organization for Kent County. Part of our role is to focus on business attraction and also to support local businesses looking to expand. Bayhealth is not only one of our largest employers in the area, but they are one of the most vital institutions serving our community. Dover and Kent County have experienced strong positive growth in job creation. To sustain this momentum, our healthcare infrastructure must grow alongside and meet the needs of our residents and our workforce that continue to grow. For these reasons, they strongly support this project and ask that the Commission approves it.

Mrs. Melson-Williams stated that they received written correspondence in regards to this application. It was provided to the Planning Commission members on their desks this evening. It’s on letterhead of the Church of the Holy Cross and dated January 16, 2026. It is addressed to the Planning Commission and states, “ To Whom it May Concern: I am writing to share that I, as Pastor of Holy Cross Church, have been made aware of the expansion plans of Bayhealth

15
18

Paj 19

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

Hospital, Kent Campus, including their plan to request a 10-story bed tower, new parking garage on State St., and Emergency Department upgrades. I believe that their mission to serve the region with healthcare is important to the community and their expansion is clearly dedicated to that mission. I would like to share that we at Holy Cross Church are supportive of the hospital’s expansion and have no concerns with the approval of their master plan.” It is signed In Christ, Rev. James Lentini, Pastor.

Mrs. Melson-Williams stated that Mrs. Welsh joined the meeting about 30 minutes ago.

Mr. Witham closed the public hearing.

Mr. Witham stated that is his understanding that the DAC as well as the Planning Office recommends approval of the waiver for the bicycle reduction. Responding to Mr. Witham, Mrs. Melson-Williams stated that is correct.

Mr. Lewis moved to approve S-26-01 Bayhealth Medical Center, Inc. – Kent Campus: Master Plan Phase 1-3 to include the waiver request for the reduction of bicycle parking requirement as well as the Parking Adequacy Statement that was under consideration, seconded by Mrs. Maucher and the motion was carried 7-0 by roll call vote with Mrs. Denney and Mr. Baldwin absent. Mr. Lewis voting yes. Mr. Roach voting yes; it is a welcomed addition and he definitely appreciates the proactive approach in regards to the reactive approach. Thank you so much for all of the detail that was put into this; it was amazing. Mrs. Maucher voting yes; based on DAC comments and the Bayhealth’s willingness to accommodate any comments that were in there. It is a much needed addition and very welcomed and hopefully it will be a good draw for good paying jobs in the area. Dr. Jones voting yes; for all of the reasons previously stated. She would also like to thank the presenters for the presentation. She had no problems following tonight and reading right along and she also thanks Mr. Paradee for reminding us of our responsibility tonight. Mr. Reaves voting yes; for reasons previously stated. Mrs. Welsh voting yes; this is a worthy project and the presentation that she experienced was very well done. She is looking forward to utilizing such a vast facility in about 20 years when she is old and needs it. Mr. Witham voting yes; we had an excellent presentation by a number of people representing the hospital. This redevelopment plan is desperately needed and he thinks the Commission’s questions were all answered in a way in which we all understand and agree with. The hospital is in full agreement with the DAC comments so he sees no reasons why we should not approve this plan.

S-26-02 – R.E. Pierson Regional Headquarters (Office, Garage and Contractors yard) at 30 Lafferty Lane – Public Hearing and Review of a Site Plan Application to permit the construction of R. E. Pierson Regional Headquarters to consist of a 9,900 SF Office Building, a 9,600 SF Garage with a fenced Contractors Work Yard (laydown and equipment storage) area, and associated site improvements. The project development area is 5.284 acres of the overall parcel of 29.6135 acres. The property is zoned M (Manufacturing Zone) and is subject to the AEOZ (Airport Environs Overlay Zone): Accident Potential Zone I (APZ I) and Noise Zone A. The property is located on the south side of Lafferty Lane between Bay Road and Horsepond Road. The owner of record is Richard E. Pierson Construction, Co. Property Address: 30 Lafferty Lane. Tax Parcel Number: ED-05-077.00-01-28.03-000. Council District 2. Waiver Requests: Partial

16
19

Paj 20

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

Elimination of Sidewalk, Partial Elimination of Upright Curbing. For Consideration: Performance Standards Review Application.

Representative: Mr. Gregory Moore, Becker Morgan Group

Mrs. Melson-Williams stated that this is a Site Plan Application as noted for the R.E. Pierson Regional Headquarters. It is located on the south side of Lafferty Lane. It is kind of in the second bend of the curve if you came off of Bay Road onto Lafferty Lane. The full project area is just over 5 acres of what is a much larger tract of land that is just under 30 acres in size. You can see that the development is proposed for what is the northeast corner of the property. The property is zoned M (Manufacturing Zone) and is subject to the AEOZ (Airport Environs Overlay Zone) with portions of it falling into the Accident Potential Zone I (APZI) and Noise Zone A. The next slide shows a close up of the development. What is proposed is an office and that is the building kind of in the center of the screen. There is a parking lot between the proposed office building and Lafferty Lane and then the southern part of the development area is to include a separate garage building and a surrounding work yard area. The next slide shows some of the proposed landscaping. The garage and work yard area is a fenced area. Additionally, there are tree plantings along two of the sides. The eastern portion of the property is where we find their stormwater management facility that they are looking to design for this site and then some additional tree plantings. The use as an office building and associated garage is an allowable use within the M (Manufacturing Zone) and also within the AEOZ (Airport Environs Overlay Zone) because there are land use compatibility measures that have to be met for uses in this area. For parking, they are meeting the parking requirement. In this case, parking is at a rate of 1 space per 800 SF of floor area. We utilize the office building for that calculation finding that the garage will have likely vehicles that are parked in it for storage or minor maintenance operations for the most part. They are providing their bicycle parking associated with the office building. Site access, as you can see, is a single entrance point from Lafferty Lane and that will be subject to a DelDOT review process for that entrance. Along Lafferty Lane, we do see them proposing to construct sidewalk from that entrance to the eastern property line. They are seeking a waiver of the elimination of sidewalk installation along the balance of the property that is moving to the west from this site entrance. While the Planning Commission can consider a variance or a waiver request regarding that sidewalk, ultimately DelDOT is the final say as Lafferty Lane is a State maintained road. Additionally, they have requested a waiver for the partial elimination of upright curbing in some of their areas related to stormwater management to get those waters into a swale to then reach what is likely to become a dry pond scenario for their stormwater. That waiver is something that Planning Staff can authorize and we have done so. This project is a one-story building. The next image shows that it is basically one-story. It’s a metal building and they are using a waits coating in a different color. The front elevation of the office building has this porch that expands across the front of it. That is the upper left image in this and then the views of the other facades of the building show a series of windows. The next image is the view of the garage building. Again, making use of the metal system as well and a couple of locations of larger overhead doors. With this project in the M (Manufacturing Zone), it is subject to the Performance Standards Review Process where the applicant has to respond to whether or not the project would create any of the objectionable elements. That is further detailed in Page 7 of the DAC Report and in the applicant’s response to that. So that will be something that the Planning Commission needs to consider as part of this Site Plan Application review. We have two Waiver

17
20

Paj 21

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

requests. The first one being that elimination of sidewalk installation along kind of the western balance of the overall property. The Waiver Request for upright curbing, Staff has already approved it. Our other plan review comments are noted in the DAC Report beginning on Page 8. Recommendations that we have noted include really for them to take a look at what the stormwater management requirements are going to be and to try to focus on a dry pond design given the proximity to the Air Force Base to the south of this location. The garage building itself is slightly within one of the Noise Zones which would require some noise attenuation provisions to be met but there may be ways to minimize the intrusion of that building into that site. Then also is the Performance Standards Review Application. She does want to note that we also identified that there is a proposed street on an adjacent property that has not been constructed as of yet. It is known as Construction Drive. We believe that it is probably south of the development area but wanted to make them aware of it in case future planning for redevelopment of the balance of this site could make use of that proposed City street network that’s planned for at least the property to the east of the subject site. The Development Advisory Committee Report also contains the comments from the other regulatory agencies including Public Works, the Department of Water/Wastewater, the City’s Fire Marshal’s Office, DelDOT, the Kent Conservation District and the Dover Kent County MPO.

Mr. Moore stated that they prepared the plans and have fully reviewed and agrees with all of the comments from the DAC. Just a clarification on the sidewalk and our Waiver Request; we are not objecting to putting a sidewalk there, we just want to schedule that when we develop that piece of the property.

Mr. Witham stated that he thinks their letter indicated that you will be installing it along the frontage of the proposed project area. Responding to Mr. Witham, Mr. Moore stated that is correct. They are going to put the sidewalk in right in front and then as the other part develops, they will connect that all together. So, it’s really not a Waiver Request; it’s a phasing request.

Mrs. Maucher asked if they grant the Waiver Request for this project, they will need a Site Plan for the other portion of the project in which case they would have the sidewalk requirement. Is that correct? Responding to Mrs. Maucher, Mrs. Melson-Williams stated that the Code talks about sidewalk along the property frontage. In this case, there is only a small portion of the property that is proposed for development at this time and that is where they are proposing to do the sidewalk. Technically, our Code would say that you install the entire sidewalk for the entire property at this point in time. They are looking for an option to phase, which she thinks you could reasonably consider as part of a Waiver Request; however, she will note that the installation of all or only a portion of the sidewalk will be subject to DelDOT review and they (DelDOT) certainly, in this case, have the final say when it comes to that sidewalk. She knows that DelDOT has a couple of options related to some fees-in-lieu and to hold some things in abeyance too, but tonight you could certainly recommend a Waiver Request to allow that phasing of it noting that future development would most certainly require that continuation of sidewalk.

Mrs. Maucher stated that her other question would be, is there other sidewalk along Lafferty Lane or is this going to be a sidewalk to nowhere? Responding to Mrs. Maucher, Mrs. Melson- Williams stated that there have been other projects to the north and east of this location where

18
21

Paj 22

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

sidewalk has been constructed recently or is in the works. This is near the Dover Industrial Park site so there is sidewalk as part of that project. There are certainly gaps along Lafferty Lane, but some of that is because properties have not developed or have developed prior to such regulations.

Mr. Witham opened the public hearing.

Mr. Zach Prebula – Kent Economic Partnership at 555 Bay Road Dover, DE 19901 Mr. Prebula stated that they are in support of this project. This Lafferty Lane area is a growing area and continues to attract new businesses and create jobs for this area. This is a company that is looking to do just that by creating jobs for Dover and the County. For those reasons, they ask that the Commission please support this project.

Mr. Witham closed the public hearing.

Dr. Jones moved to approve S-26-02 – R.E. Pierson Regional Headquarters (Office, Garage and Contractors yard) at 30 Lafferty Lane to include the Waiver Request for the partial elimination of upright curbing which will be phased in and future development would require the remaining sidewalk as well as consideration for compliance with the Performance Standards Review Application, seconded by Mrs. Welsh and the motion was carried 7-0 by roll call vote with Mrs. Denney and Mr. Baldwin absent. Dr. Jones voting yes; for reasons stated in the motion. Mr. Reaves voting yes. Mrs. Welsh voting yes; for reasons stated in the motion. Mr. Lewis voting yes. Mr. Roach voting yes. Mrs. Maucher voting yes; based on DAC comments. Mr. Witham voting yes; based on the DAC comments, the presentation, and the applicant should be aware that we are not the final authority on the curbing on a DelDOT maintained road.

S-26-03 – The Enclave Apartments: Revised Walker Road Apartments – Public Hearing and Review of a Site Development Application for the construction of two (2) three story, garden style apartment buildings consisting of twenty-four (24) units each for a total of 48 units. Also proposed are a Clubhouse, parking lot improvements, and four (4) outdoor recreation areas. The property is zoned RM-2 (Medium Density Residence Zone). The subject site consists of one parcel totaling 6.08 acres +/- located on the north side of Walker Road and west of Independence Boulevard. The owner of record is Dover Synergy Group, LLC. Property Address: unaddressed parcel on Walker Road. Tax Parcel: ED-05-067.18-01-71.00-000. Council District 4. Waiver Request: Partial Elimination of Upright Curbing. For Consideration: Active Recreation Area Plan. The project was previously reviewed as S-23-22 Walker Road Apartments in December of 2023; that plan is being superseded.

Representative: Mr. Tolano Anderson, Owner; Mr. Rich Sinegar, Scott Engineering

Mrs. Melson-Williams stated that this is a Site Plan for The Enclave Apartments located on Walker Road. It is a just over 6 acre area of land that is zoned RM-2 (Medium Density Residence Zone). Their proposal is for a project of two apartment buildings which would consist of a total of 48 units. The other building on the site is a Clubhouse building that also includes their leasing office. This project may look slightly familiar. There was a Plan, S-23-22 for a project called Walker Road Apartments that the Planning Commission granted conditional

19
22

Paj 23

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

approval of in December 2023. That plan has now expired and this is a slightly different configuration of the proposed development for this property. The RM-2 (Medium Density Residence Zone) does allow for apartments as one of the allowable uses. For apartments, the parking calculation is based on a dwelling unit calculation and also additional space related to any onsite offices. So, they are providing a total of 115 parking spaces which satisfies that parking requirement. They have also identified a number of bicycle racks throughout the site to meet the bicycle parking requirement. They did make a request for a waiver for the partial elimination of curbing. There is a rear emergency access drive that encircles to the rear of the buildings. You find that along what are the left and the top of this plan drawing. Planning Staff has authorized that Waiver Request to eliminate curbing in that area. The balance of the entrance drive coming into the site and the parking area does have the upright curbing. Related to sidewalks, this site has a narrow access drive that comes in off of Walker Road. That will be flanked by sidewalk leading into the site which then circulates through the parking lot areas and to each of the buildings. There is existing sidewalk along the frontage of Walker Road for this parcel and for its single family house neighbors that are there directly on Walker Road. As noted, there is a rear emergency access requirement and the Plan is providing that. The project includes lighting. There is in this lower right hand corner, a stormwater management pond that is a DelDOT facility. It is actually now part of the right-of-way for Walker Road it seems; so, we are asking for a Record Plan to definitively show that along with any easements for this project to make use of that stormwater pond as part of their drainage plan. This project, as she noted earlier, has an Active Recreation Area Plan and that was reviewed by the City’s Parks, Recreation and Community Enhancement Committee earlier this month. They did recommend its approval. There is a separate report document that focuses specifically on the Recreation Plan for this project. It meets one of our exemptions finding that it’s a small development which then means that its Active Recreation Area requirement is a minimum of 150 SF per dwelling unit or a minimum of 10,000 SF. They are just over that as long as the Clubhouse area continues to provide some active recreation in addition to the office that is proposed there. The other components of the Active Recreation Area include a half-court basketball, a volleyball court and then two areas which appear to be lawn areas for other types of active recreation. The building also has requirements for tree planting. This site does consist of woodland areas and we have asked for a little bit better definition of what those existing areas are and what will be proposed for clearing. The Plan data column indicates that there are 4.19 acres of existing woods and they are proposing to remove 2.09 acres which gets them just under the 50% maximum clearing so we want to make sure that they are fully compliant with that. From a tree planting perspective, they are maintaining woodland but then for the non-woodland areas of the balance of the site, there are tree planting requirements. They will need to be planting at least 58 trees. Their Plan currently shows 61 to meet that requirement. This property is a little unique in that the eastern part of the site is transversed by somewhat of a ditch network and wetland area which then necessitates a wetland buffer. They are looking to make use of the wetland buffer at a 30 foot distance which means there are riparian plantings of trees and other vegetation as well as bank stabilization that must be implemented in order to reduce that buffer to 30 feet. The project went through the Planning review comments that start on Page 7. As noted in our recommendations, the Planning Staff has approved the elimination of upright curbing for a portion of the site and we provide some guidance notes regarding the woodland clearing and that wetland buffer. Then we are certainly encouraging them to think about bicycle parking opportunities and whether some of those could be covered in some fashion or interior to buildings. We certainly encourage

20
23

Paj 24

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

planning for electric vehicle charging options. We did recommend that Record Plan to clearly place the stormwater management pond in the right-of-way because right now on our mapping, it appears that it’s part of the main overall parcel. Additional comments were provided to gleam some more details regarding that Active Recreation Area Plan. The other agencies have provided comments as part of this including the Public Works Department, the Department of Water/Wastewater, the Fire Marshal’s Office, DelDOT, the Kent Conservation District, and Dover/Kent County MPO. Those all make up the Development Advisory Committee comments that are presented here. The next image does show an example of the architecture for the project. As noted, it’s a three-story building with a mix of materials and a hipped roof structure. The next image shows a similar format for the one-story Clubhouse at this location.

Mr. Anderson stated that as you can see, the Plan that the Commission approved in 2023 has been tweaked but he doesn’t think that its overall significantly. He does want to point out a couple of things. They are excited about the project and he is here to speak on behalf of the application. Affordable housing is still a problem in our city. There is just a need for more and more housing so we think that this project answers the mail on that with its 48 apartments. We are excited to be able to provide housing, maybe for some of those people from the Bayhealth application. We are certainly in agreement with the DAC comments. We’ve appreciated the process with them and with the Planning Staff. Everything looks good and you can see that there have been some changes. They think it is going to be a good use of that land and a good use providing housing for the people who need it.

Mrs. Maucher stated that on the stormwater pond, DelDOT owns it and you would have access to it. Is that what she is understanding? Responding to Mrs. Maucher, Mr. Anderson stated yes, that is the plan.

Mrs. Maucher asked if that is a pretty common occurrence. Could DelDOT say “no, you’re not using our pond; you have to do your own?” Responding to Mrs. Maucher, Mrs. Melson-William stated yes and yes. The stormwater management pond, they believe, was an existing facility built when they made improvements to the Walker Road corridor a number of years ago. It is somewhat interconnected with the drainage ditch that runs through this site and the wetland area. This project will have to account for stormwater management and if there is this opportunity to make use of that pond, it may have been designed in order to accommodate future development. But that is something that they will have to prove with the Kent Conservation District and ultimately seek permission with DelDOT.

Mrs. Maucher further asked if DelDOT would then still have maintenance control or would it go to the apartment owner? Responding to Mrs. Maucher, Mrs. Melson-Williams stated that she believes the question of maintenance would be part of any kind of authorization to outfall into it and as to the maintenance responsibilities long term.

Mrs. Maucher asked for apartments, are you looking at single, double, or three bedroom apartments? Responding to Mrs. Maucher, Mr. Anderson stated that they are looking at a combination.

Mrs. Maucher further asked if they will have elevators. Responding to Mrs. Maucher, Mr.

21
24

Paj 25

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

Anderson stated that there would be stairs.

Mr. Witham stated that he gathers from Mrs. Melson-Williams comments that the maps may somewhat need to be tweaked because she is saying that there is some impact on this stormwater drainage. Responding to Mr. Witham, Mrs. Melson-Williams stated that they have additional work to do to fully define what their stormwater management plan is for the site. She’s not sure if the engineer can speak to where their current work on that is regarding the site overall and this existing pond.

Mr. Sinegar stated that they are working with DelDOT. It was originally a piece of this property that was cut out back in 2002 when the Walker Road project was done and there is deed for that project. The mapping wasn’t corrected but there is a deed for that property that is now State right-of-way. So, that’s where Mrs. Melson-Williams was looking for a Record Plan to justify that, but we are in the process of talking to DelDOT and making sure there is capacity for it. There will be a maintenance agreement and there will be a shared use agreement for that. We are in the process of working with DelDOT for that.

Dr. Jones stated that Mr. Anderson mentioned the area being very much in need of affordable housing. Can you speak to “affordable”? What range in pricing are you looking at? Responding to Dr. Jones, Mr. Anderson stated that looking at the economy today, that’s a moving target. He would say what’s affordable in his personal opinion is what an average family could afford in the current market conditions. Now that’s changing; if we actually look at what the market’s done just in the last twelve months you can see significant changes in what housing runs for. We have maybe 25 individual rental units right now and those rents are moving significantly higher than what most people can afford. Our objective here is to create an apartment complex that will be reasonably priced based on the actual market. It would be unfair to try to predict what that would be at this point.

Dr. Jones stated that she was a little surprised to look in your Active Recreation Area Plan, given where the apartment buildings will be and I didn’t see an opportunity for pickle ball. Pickle ball is one of the fastest growing sports. You have basketball and volleyball. Did you consider that at all? Responding to Dr. Jones, Mr. Anderson stated no, he had not considered pickle ball, but we will certainly put that into consideration.

Dr. Jones stated that it may even bring some clients.

Mr. Witham opened a public hearing and after hearing no one wishing to speak, closed the public hearing.

Dr. Jones asked if there were any comments from neighbors received. Responding to Dr. Jones, Mrs. Melson-Williams stated that there was no written correspondence received. She is not sure that we had any individuals who came in to ask about this one either.

Mrs. Welsh moved to approve S-26-03 – The Enclave Apartments: Revised Walker Road Apartments inclusive of the consideration for the Active Recreation Area Plan and also for the Waiver Request for the partial elimination of upright curbing, seconded by Mr. Lewis.

22
25

Paj 26

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

Mr. Witham asked if the DAC comments mentioned any ADA ramps at the end of the sidewalks. Responding to Mr. Witham, Mrs. Melson-Williams stated that she believes that is one of the comments that would need to be clarified. Any time that a sidewalk interconnects with the parking drive aisle, the appropriate ADA accessible ramps are required. So its not just at the entrance but internal to the site as well.

Mr. Witham stated that it is his understanding that the applicant does agree with the DAC comments.

Mrs. Welsh moved to approve S-26-03 – The Enclave Apartments: Revised Walker Road Apartments inclusive of the consideration for the Active Recreation Area Plan and also for the Waiver Request for the partial elimination of upright curbing, seconded by Mr. Lewis and the motion was carried 7-0 by roll call vote with Mrs. Denney and Mr. Baldwin absent. Mrs. Welsh voting yes; the plan seems to be a good re-do of the previously approved plan that lapsed, so she thinks it’s a good use of the space. Mr. Lewis voting yes. Mr. Roach voting yes; we need housing in this area desperately. Mrs. Maucher voting yes; based on DAC comments and the applicant’s agreeableness to the DAC comments and she also recognizes the need for additional housing in the area. Dr. Jones voting yes. Mr. Reaves voting yes; for reasons previously stated. Mr. Witham voting yes; the applicant does agree with the DAC comments and it’s certainly a given that Dover does need additional housing that meets the needs of the public. This appears to be a plan that will meet that requirement.

S-26-04 – DuPont Plaza at 747 N. DuPont Highway: Revised Master Plan – Public Hearing and Review of a Revised Site Development Master Plan with Minor Subdivision Plan to permit phased construction of a retail center known as DuPont Plaza. The center consists of four buildings totaling 44,366 SF and is to be constructed in phases. The buildings proposed include a 7,440 SF Building A - Retail; 12,950 SF Building B - Retail; 2,046 SF Building C – Restaurant; and 21,930 SF Building D – Retail (Tractor Supply). The property consists of 9.954 acres and is proposed to be subdivided into multiple lots. The property is zoned SC-2 (Community Shopping Center Zone) and subject to the SWPOZ (Source Water Protection Overlay Zone). The property is located on the east side of North DuPont Highway and south of Leipsic Road. The owner of record is Rojan 15 DD, LLC. Property Address: 747 North DuPont Highway. Tax Parcel: ED- 05-068.05-01-15.00-000. Council District 3. PLUS #2018-02-02. Waiver Requests: Subdivision Waiver – Lots without Public Street Frontage. This site was subject to S-19-03 Retail Center at 747 N. DuPont Highway: Master Plan reviewed by Planning Commission in 2019 with its Final Plan approval issued in 2021 along with Administrative Site Plan S-19-18 DuPont Plaza: Phase 1; the plans are expired. A proposed

Representative: Mr. Doug Liberman, Larson Engineering Group; Mr. Bob Aerenson (virtual); A representative of MSP Development

Mrs. Melson-Williams stated that this is a Site Development Master Plan for DuPont Plaza located at 747 N. DuPont Highway, known years ago as the Berry Van Lines site. The property is zoned SC-2 (Community Shopping Center Zone) and is subject to the SWPOZ (Source Water Protection Overlay Zone). This property in conjunction with the adjoining property to its east

23
26

Paj 27

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

where The Edge Apartments is under construction, make up the area that’s zoned SC-2 (Community Shopping Center Zone) and meet that land massing requirement. As such, the two projects share an entrance drive that comes from Leipsic Road to access both properties. The project is proposed and consists in this version of a Master Plan to be four (4) buildings. The property is located along the east side of N. DuPont Highway so at that point, there is a right-in right-out entrance that leads to circulation drive aisles throughout the complex. Then you can see on the left hand side that other drive that goes back over to Leipsic Road. There are four buildings that are proposed and we know the most about the one at the top of the screen which has been identified as a potential location of a Tractor Supply building and kind of garden center area. For all of the buildings, retail uses are allowed and there is also as designed here, one of the buildings that potentially could be a restaurant with drive through. With a Master Plan, what is presented to you is their concept and then each phase will have to submit an Administrative Site Plan for review of that specific phase for its details. With this project, our Report noted all of those previous Master Plans. With this one, it consists of four phases, four buildings, and a building in each phase. They are also proposing a Minor Subdivision. It’s a little hard to see on these images but there is a proposal to set the Tractor Supply area as one lot and then the building closest to DuPont Highway on another lot and then the intervening areas on a third lot. What that then leads us to is their Subdivision Waiver Request. This configuration of lots ends up with at least one lot that has no frontage at all on a public street and then another lot that has very limited frontage. The Land Subdivision Regulations for the City of Dover as part of our Code in Appendix A do allow for waivers of the Subdivision Regulations. We think because this is meant to function as an overall shopping complex, that it is reasonable to consider these Subdivision Waivers in order to place individual areas on individual lots; however, they will have to be linked together by easements related to circulation, access, and utilities. With the property being in the SWPOZ (Source Water Protection Overlay Zone), there are some limitations related to use. There are early versions and it may still appear in some of your plan sets that the building closest to DuPont Highway potentially could be an America’s Tire facility; however, Staff has determined that that use is a type of motor vehicle service which his not allowed in the SWPOZ (Source Water Protection Overlay Zone). Additionally, there are impervious surface coverage limitations with that SWPOZ (Source Water Protection Overlay Zone) and with some caveats that the Master Plan review process can allow a larger area to be impervious if an Excellent Recharge Area for stormwater management is designed. They will be working through the process to definitely determine that and previous project designs were able to achieve that. From a parking standpoint, parking is based on square footage and this, as required, meets the parking requirements and then some. There is over 142 regular parking spaces plus additional handicapped parking spaces that are proposed with the project and then they should also provide bicycle parking spaces at the site. As noted, site access comes from N. DuPont Highway and from Leipsic Road. The design of those entrances is subject to DelDOT review. They are showing sidewalk along the DuPont Highway frontage with sidewalks leading into the site and circulating the site. Likewise, the entrance location from Leipsic Road has sidewalks planned and some of that has actually been built with the construction of the apartments that is underway on the adjacent property. With the Master Plan, a lot of times we do not have full building architecture. They did in their submission provide us information on the Tractor Supply location and what that rendering does look like. The rendering on the screen shows the potential version of the Tractor Supply. You can see all four elevations and there has been some discussion with the applicant to continue that red banding that we see on some of the

24
27

Paj 28

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

facades around to the rear which is the bottom image on this screen, as that will be visible from the adjoining parking areas and that entrance drive that is shared with the apartments. As they move into development of the other phases of the project, the architecture for those buildings would need to revisit the Planning Commission. For tree plantings requirements, they are meeting those. There is a requirement to plant 145 trees throughout the site. They are in some cases used as screening opportunities, in other areas on the perimeter for the screening, and then also throughout the parking lot areas and islands. The project also requires that Arterial Street Buffer that’s along the frontage along DuPont Highway. That is an area of thirty (30) feet in depth and they are providing that with this plan design. The Planning Staff noted our various comments for the project. Some of our recommendations focus on the fact of the opportunity for the Tractor Supply change in architecture. We are recommending in favor of the Subdivision Waiver finding that this is a project that is overall linked together and for financing and long term ownership of this, they will be forever linked even if individual buildings are placed on individual lots. The Development Advisory Committee Report includes the information and comments from the other regulatory agencies including the Department of Public Works, the Department of Water/Wastewater, the Fire Marshal’s Office, DelDOT, the Kent Conservation District and the Dover/Kent County MPO.

Mr. Liberman stated that Mrs. Melson-Williams does a nice job going over everything but he will go back through and kind of hit the high points. DuPont Plaza was the abandoned Berry Van Lines site located at 747 N. DuPont Highway. The site is generally located at the southeast corner of Leipsic Road and Route 13. The area is largely commercial all the way around. We have apartments for Silver Mill and The Edge that are nearby and he thinks the closest housing lot is over 850 feet from the site. The site has gone through the Brownfield Remediation and has had a few attempts at being developed over the past 15 years. The last approved Master Plan was done on the site in 2019. Development was for four buildings totaling 62,200 SF at that point. Ultimately, that project did not move forward mostly due to COVID-19. The owner had signed leases for the bulk of the development but he did not want to hold those companies to those deals as he wasn’t sure and they weren’t sure what the business climate was going to be coming out of COVID. It has taken six (6) years now for us to get to this point where they are ready to move forward. Tonight, we have a Revised Master Plan for the four buildings totaling 44,366 SF. This includes a 21,930 SF Tractor Supply Co store on the rear of the parcel. There are ongoing negotiations with tenants for the other three buildings. Our plan tonight is to hopefully get Planning Commission approval for the Master Plan and then move forward with Tractor Supply plans, the entrance plans off Route 13, and the internal drive aisles. We would then acknowledge that if there are major changes to the Plan and building layouts for the others that we have to come back to the Commission to present those changes. The site is served by two entrances as Mrs. Melson-Williams mentioned: a rights-in and rights-out on Route 13 and full access off of Leipsic Road. The access off of Leipsic Road has already been constructed. We will have to make an application to DelDOT to re-approve the entrance on Route 13. They will have to verify the traffic counts and everything for the site, but given that we have less square footage, we are going to have less traffic trips. Traffic trips are what determine the length of our turn lanes; so, what’s already been approved should be approved again. But those are the famous last words and we will see how that goes. We acknowledge that we have to deal with DelDOT. The site is located within the SWPOZ (Source Water Protection Overlay Zone). We will be infiltrating a large portion of the runoff from the site to meet the standard of the Superior Infiltration Design.

25
28

Paj 29

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

We are decreasing the impervious from what was originally on the Berry Van Lines site of 77.4% and even from the previously approved plan which was 74.9% down to the 71.3% that we are showing on the site. We did meet with Kent Conservation District to discuss a path forward with the review of our plans. We plan to use the original design. If you take a look at the pond on the upper left corner of the site that is the original pond that was called for in the other plans and they have an underground infiltration system on the front pad. We are also proposing to keep that. So, we just have to work out the sizes on those based off of what we have flowing to those but he thinks that the original layout and sizes that they have are going to be more than enough for what we need to do to provide stormwater management for the site and meet infiltration requirements of the Source Water Protection Area. The site previously had an approved Comprehensive Sign Package. We intend to update that package and present it to you once we get a couple more tenants in and definitely before Tractor Supply goes to construction. So, we will be back for that package and again, prior to construction. We reviewed the DAC comments and are in agreement with them with the exception of Comment 6 and he doesn’t know if we are necessarily in disagreement with what Mrs. Melson-Williams had in the Report, but that’s the one that relates to the 1,000 gallon above ground propane tank. Within the SWPOZ (Source Water Protection Overlay Zone), we are not allowed to have what the Code calls “gas tanks.” Propane is stored under high pressure when it’s a liquid but when it’s introduced to atmosphere, if becomes airborne gas. It is not a liquid so it does not infiltrate into the ground and does not become a groundwater contaminate. At this point, we are waiting for DNREC to weigh in on that matter but they wanted to point out the propane is naturally an airborne gas and not a liquid gasoline. There is a definite difference where propane is not very soluble with water so groundwater would not be an issue with allowing the propane tank on the site. We do understand that the architectural elevation for each additional tenant need to come back before Planning Commission for review and actually it is going to be a good way to update the Commission as to the status of the development and give you a say in kind of what’s going on. At that point, Mrs. Melson-Williams did mention the comment about carrying a red band around the back of the building and he believes that the developer agreed to do that so that will address Mrs. Melson- Williams’ comment towards the architecture. We did not have any concerns with the comments from the City of Dover Department of Public Works and Water/Wastewater, Fire Marshal, DelDOT or the Dover/Kent County MPO that were listed in the DAC Report. Again, Mrs. Melson-Williams mentioned the Subdivision Waiver for the project from the Appendix A- Subdivision, Article IV E.5 which requires each lot to have frontage on a public street. In this case within this zoning district, we have to have 150 feet of frontage for each lot. For the three proposed lots, we have one lot with legal frontage at 289 feet, one with minimal lot frontage with just a hair over 75 feet and then the Tractor Supply at the rear of the site which does not have any frontage. As you can see from the layout of the site with only 367 feet along Route 13 trying to get frontage for these parcels really doesn’t work so we have to really rely on that Subdivision Waiver to provide the individual lots that are necessary for this development. Granting this Waiver would not set a precedent as he believes that the Center at Dover has the same type of situation with commercial lots that do not front on public streets and again, how the development looks and operates does not change if the Waiver is granted. Therefore, we would like to request approval of the Revised Master Plan for DuPont Plaza conditioned upon the DAC comments and obtaining all agency approvals.

Mr. Lewis stated that he is intimately familiar with this site. He worked almost 10 years at Dover

26
29

Paj 30

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

Motor Speedway and he lives due south of here just north of the lake. Literally anything at this lot would look better than how it looks now. It’s just empty and blank and there are plenty of opportunities for growth and building and new businesses on our main corridor on Route 13 and this is one of them. He is looking forward to seeing what’s coming there. Responding to Mr. Lewis, Mr. Liberman stated that he thinks this is one of the last really open parcels on Route 13.

Mr. Lewis stated that there are a couple but there are several empty storefronts and he is happy to see that this is reaching this phase.

Mr. Witham asked what was going to happen to the Tractor Supply Store south of Dover in Camden. Responding to Mr. Witham, Mr. Liberman stated that it is still going to be there. The place looks busy every time he drives by.

Mrs. Maucher asked if the propane was for resale. Responding to Mrs. Maucher, Mr. Liberman stated yes.

Mrs. Maucher further asked if the access off of Route 13 and Leipsic is part of the Phase I for the Tractor Supply, correct. Responding to Mrs. Maucher, Mr. Liberman stated that the access off of Leipsic Road is already there and then as part of Phase I, yes we are going to be constructing the entrance off of Route 13.

Mrs. Maucher asked if it would be inclusive of the sidewalk. Responding to Mrs. Maucher, Mr. Liberman stated yes.

Mr. Witham stated that he assumes that the propane to be sold is going to be sold much like you would see at Home Depot or Lowes. Responding to Mr. Witham, Mr. Liberman stated that you would bring your jug and then they refill it at the store. It’s not like Lowes or Home Depot; they have the big racks where you pay your money, drop your tank in and grab a new one. This is just you bring your tank and they fill it.

Mr. Witham asked Mrs. Melson-Williams if that requires a waiver from the Commission. Responding to Mr. Witham, Mrs. Melson-Williams stated that the question about the above ground storage tank for the propane is something that we identified during the review process and Planning Staff (our Planning Consultant that was working on this) has reached out to DNREC. There has been some initial conversation, but she is not sure that we have everything totally formally in writing as of yet. We did ask that question as to whether this would be something that would impact groundwater. There is certainly a permitting process with DNREC for above ground storage tanks of a certain size anyway, but we need to have the question clarified about whether it’s allowed in the SWPOZ (Source Water Protection Overlay Zone). We are certainly working with the applicant to figure that out at this point. There is not really an action that the Planning Commission specifically needs to do with that. It is just going to be a question of zoning verification compliance if that use is allowed in the SWPOZ (Source Water Protection Overlay Zone).

Mr. Witham asked if that means that any motion to approve the application will have to be subject to zoning compliance. Responding to Mr. Witham, Mrs. Melson-Williams stated yes, any

27
30

Paj 31

CITY OF DOVER PLANNING COMMISSION JANUARY 20, 2026

Item 1.

motion would be subject to that. She thinks there is a comment as referenced by Mr. Liberman about it in our DAC Report. In Section VIII, Number 6 talks about that propane filling station aboveground storage tank and that we are further evaluating whether that is zoning compliant at this point.

Mr. Aerenson stated that if there were any questions, he would be happy to answer but he thinks Mr. Liberman did a fabulous presentation. He thinks the Commission has all of the information that you need and we appreciate this court.

Mr. Witham opened the public hearing and after seeing no one wishing to speak, closed the public hearing.

Mr. Lewis moved to approve S-26-04 DuPont Plaza at 747 N. DuPont Highway: Revised Master Plan with acknowledging the Subdivision Waiver with the public street frontage and also acknowledging that some of the outstanding issues may be subject to zoning requirements and/or the purview of Council, seconded by Mrs. Maucher and the motion was carried 7-0 with Mrs. Denney and Mr. Baldwin absent. Mr. Lewis voting yes; again, it is a much needed project for that area. Mr. Roach voting yes; he agrees that it is definitely needed. Mrs. Maucher voting yes; based on DAC comments, the presentation from the applicant, and she concurs that it is a needed project. Dr. Jones voting yes; based upon previous comments. Mr. Reaves voting yes. Mrs. Welsh voting yes; for reasons previously stated. Mr. Witham voting yes; based on the presentation, the comments received tonight by the Commissioners, and the DAC recommendations.

NEW BUSINESS

No items of New Business.

PUBLIC COMMENTS OPPORTUNITY

No members of the public spoke.

Meeting adjourned at 8:52 PM.

Sincerely,

Kristen Mullaney
Secretary

28
31

Paj 32

Item 2.

City of Dover
PETITION TO ANNEX AND REZONE PROPERTY
Development Advisory Committee Meeting of February 4, 2026
Public Hearing Before Planning Commission on February 17, 2026

File Number: AX-26-01

Ordinance Number: 2025-23

Applicant/Owner of Lupe N. Fuller
Record:

Property Address: 7 Nixon Lane, Dover DE

Tax Parcel ID #: ED-00-068.19-01-28.00-000

Lot Size: 0.9533 acres +/- (41,526 SF)

Present Zoning: RS-1 (Residential Single Family Zone)

Proposed Zoning: R-8 (One Family Residence Zone)

2019 Comprehensive Category 1: High Priority Annexation Areas Plan Designation:

2019 Comprehensive Residential Medium Density Plan Land Use Category:

Present Use: Single Family Detached Dwelling

Proposed Use: Single Family Dwelling and potential future subdivision of vacant area into multiple lots

Utility Availability: Electric: 7 Nixon Lane is currently served by City of Dover Electric. With any future redevelopment of the property, the electric service needs will be evaluated. The property owner will be responsible for any and all costs associated with the changes of electrical service needs related to any future redevelopment including extending and providing service upgrades to the proposed property.

Water and Sanitary Sewer: 7 Nixon Lane is not served by City
of Dover Water. 7 Nixon Lane is not served by Sanitary Sewer.
The property owner has not contacted the Department about the
possible connection to these services. Water and Sanitary Sewer

32

Paj 33

Item 2.

are available to this property. The property owner is responsible
for any and all costs associated with extending and providing
service upgrades to the property. This may include, but not
limited to, tapping the sanitary sewer and water mains,
connection to the building for both utilities, purchasing
appropriately sized water meter and pit, paying impact fees, and
obtaining permits.

Staff Recommendation The Electric Department has no objection to the annexation. for AX-26-01: The Department of Water and Wastewater has no objection to the annexation.

  • P.O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 33

Paj 34

Item 2.
City of
CITY OF DOVER Dover
Planning
Office
DEVELOPMENT ADVISORY COMMITTEE

APPLICATION REVIEW COMMENTARY

D.A.C. MEETING DATE: February 4, 2026

APPLICATION: Annexation of Lands of Fuller at 7 Nixon Lane, Dover DE

FILE #: AX-26-01 REVIEWING AGENCY: City of Dover Planning

CONTACT PERSON: Dawn Melson-Williams, AICP, Principal Planner PHONE #: (302) 736-7196

Note: This Review Report was initially prepared by Staff of the Rossi Group (under a Planning Services contract with the City of Dover). The DRAFT Report was completed with additional review and editing by the City’s Planning Office.

  • I.APPLICATION SUMMARY Review of an Annexation Request and Rezoning Request for a parcel of land totaling 41,526 SF+/- (0.9533 acres +/-) located at 7 Nixon Lane. The property is currently zoned RS-1 (Residential Single Family Zone) in Kent County. The proposed Zoning is R-8 (One Family Residence Zone). The property is located on the east side of Nixon Lane slightly north of North Little Creek Road. The annexation category according to Dover’s 2019 Comprehensive Plan is Category 1: High Priority Annexation Area and the land use designation is Residential Medium Density. The property owner is Lupe N. Fuller. Property Address: 7 Nixon Lane. Tax Parcel: ED-00-068.19-01-28.00-000. Proposed Council District 3. Ordinance #2025-23.

Existing Property The property is located on the east side of Nixon Lane near the intersection with North Little Creek Road. The subject parcel is contiguous to the City boundary north of the subject parcel (55 Nixon Lane) and west across Nixon Lane (30 Nixon Lane and 1335 East Division Street). The parcel is part of a larger group of parcels on Nixon Lane and Acorn Lane that makes up an enclave that is surrounded by the City. The property includes an existing single-family detached dwelling on the south end of the parcel. The property is currently zoned RS-1 (Residential Single Family Zone) in Kent County. Surrounding Land Uses The property is surrounded by residential properties, some in the City and others in unincorporated Kent County, mostly developed with single-family detached dwellings. One of the parcels to the west, across Nixon Lane in unincorporated Kent County, has manufactured homes on it. Other lots on Nixon Lane that are within the City of Dover are zoned RM-1 (Medium Density Residence Zone), R-8 (One Family Residence Zone), and R-20 (One Family Residence Zone).

II. COMPREHENSIVE PLAN COMPLIANCE REVIEW

In the 2019 Comprehensive Plan, the Potential Annexation Areas (Map 13 -1) identifies the property in the Category 1: High Priority Annexation Areas. The Growth and Annexation Plan

34

Paj 35

Item 2.
AX-26-01 Lands of Fuller at 7 Nixon Ln: Annexation
DAC Report of February 4, 2026

Chapter (Chapter 13) notes that “Lands in this category are primarily enclaves of unincorporated territory mostly surrounded by the City of Dover. In all or most of these cases, the City provides these parcels with one or more essential service (sewer, water, police, fire, trash).” For Category 1: High Priority Annexation Areas, it notes in the Recommendations that “the City will not extend sewer and/or water infrastructure to Category 1 areas unless the property owners annex into the City” with consideration given for issues of health, safety and welfare. The 2019 Comprehensive Plan also sets the review criteria for the review of zoning for parcels being proposed for annexation. Chapter 13, page 13-9 notes that the Zoning Review may include:

  • •Proposed zoning be in compliance with the land use category shown on Map 13-2 and used in conjunction with Table 12-1: Land Use and Zoning Matrix;
  • •Character and compatibility of the surrounding land uses and properties;
  • •The street type and capacity serving the property;
  • •Environmental concerns and conditions that may influence land use and zoning;
  • •Market concerns and conditions;
  • •The compatibility with the overall goals of the Comprehensive Plan.

Map 13-2: Potential Land Use for Annexation Areas identifies the Land Use Classification for this property to be Residential Medium Density. The goals and recommendations for the Residential Medium Density Land Use are listed in the 2019 Comprehensive Plan excerpts presented below:

Goals: Residential Land Uses To develop and maintain an adequate supply of housing of varying type, size, and densities that are aesthetically pleasing and located within neighborhoods designed or redesigned to promote convenience, conservation, and access to the greater community, but which are properly buffered through distance and landscaping from incompatible land uses.

Policies: Residential Land Uses • Allow flexibility in housing styles and types while regulating gross density within residential developments.

  • •Require linkage streets and sidewalks between adjoining residential subdivisions and street right-of way stubs to adjoining vacant developable land.
  • •Encourage the separation of residential areas from incompatible uses through buffering distances and the use of transitional zoning categories.
  • •Encourage high density residential development in infill areas that are near essential services, public transit, and employment opportunities.
  • •Permit limited compatible neighborhood commercial uses that support surrounding residences within residential areas.

35

Paj 36

Item 2.
AX-26-01 Lands of Fuller at 7 Nixon Ln: Annexation
DAC Report of February 4, 2026

The following is an excerpt from the 2019 Comprehensive Plan regarding Residential Medium Density Land Uses (page 12-4):

Recommendation for Residential Medium Density Residential Medium Density land uses involve a maximum gross density of eight (8) dwelling units per acre. This type of development may include single family houses on smaller lots, duplexes, townhouses, and some apartments. Some Manufactured Home Park developments would also be considered Residential Medium Density. Medium density residential uses are permitted in the following zoning districts: R-8 (One Family Residence Zone), R-7 (One Family Residence Zone), RM-1 (Medium Density Residence Zone), RM- 2 (Medium Density Residence Zone) planned to reflect the historic patterns and mix of land uses common to Dover’s early development, RG-1 (General Residence Zone), RG-2 (General Residence Zone), RG-3 (Group Housing Zone), RGO (General Residence and Office Zone), and MH (Manufactured Housing Zone). The Land Development Plan recommends that Residential Medium Density uses be permitted near existing and planned service and employment centers and in locations well supported by transportation infrastructure and mass transit services. Areas identified as Medium Density Residential can be looked at as potential receiving areas under a transfer of development rights program. Areas in the northern portion of the City are appropriate for Residential Medium Density development.

As part of the Land Development Plan, Table 12-1: Land Use and Zoning Matrix specifies that the following zones are compatible with this land use classification of Residential Medium Density.

R-10 (One Family Residence) R-8 (One Family Residence) R-7 (One Family Residence) RM-1 (Medium Density Residence) RM-2 (Medium Density Residence) Residential Medium Density RG-1 (General Residence) RG-2 (General Residence) RG-3 (Group Housing) RGO (General Residence and Office) MH (Manufactured Housing) C-1 (Neighborhood Commercial)

III. ZONING REVIEW

Request for R-8 (One Family Residence Zone) The applicant has requested the zoning of R-8 (One Family Residence Zone). The types of permitted uses in the R-8 (One Family Residence Zone) are provided in Article 3 §1 of the Zoning Ordinance and referenced sections. See the following Code excerpt:

36

Paj 37

Item 2.
AX-26-01 Lands of Fuller at 7 Nixon Ln: Annexation
DAC Report of February 4, 2026

Article 3 Section 1. – One Family Residence zone [(R-20, R-15, R-10, R-8, R-7)].

1.1 Uses permitted. In a one-family residence R-20, R-15, R-10, R-8 and R-7 zones, no building or premises shall be used and no building or part of a building shall be erected or altered which is arranged, intended or designed to be used, in whole or in part, for any uses except the following:

1.11 The raising of field and garden crops, vineyards and orchard farming, the maintenance of nurseries, and the seasonal sale of the products thereof, provided no building is erected and signs conform with article 5, section 4.

1.12 One-family detached dwellings, not to exceed one such dwelling per lot.

1.13 Public buildings, structures and uses, including parks and playgrounds, subject to approval of site plans by the planning commission in accordance with article 10, section 2.

1.14 The following uses are permitted, conditional upon the approval of the planning commission in accordance with the procedures and subject to the general conditions set forth in section 10.1 and to any specified requirements set forth below:

(a) Places of worship, including parish houses; [and] schools, including nursery schools, kindergartens and day care centers in accordance with article 5, Supplementary Regulations, section 14. Child day care facilities; philanthropic and eleemosynary institutions; hospitals and sanitariums for general medical care; and funeral homes subject to the following requirements: i. Any school permitted under this paragraph [subsection 1.14(a)] shall be a nonprofit organization within the meaning of the Internal Revenue Act and shall be registered effectively as such thereunder. ii. Any school permitted under this paragraph [subsection 1.14(a)], other than a kindergarten, nursery school, or day care center, shall occupy a lot with an area of not less than two acres, plus one acre for each 100 pupils for which the building is designed. iii. Any kindergarten or nursery school permitted under this paragraph [subsection 1.14(a)] shall be limited to a maximum of 50 children in zones R-8 thru R-20 and a maximum of 100 children in all other zones. At least 100 square feet of outdoor play space per child shall be provided. Outdoor play space shall be fenced or otherwise enclosed on all sides and shall not include driveways, parking areas, or land unsuited by other usage or natural features for children's active play space. Fencing or other enclosures shall be a minimum height of four feet. The minimum lot area for each ten, or remainder over the multiple of ten, children shall be the same as the minimum lot area requirement for each dwelling unit in the districts in which such uses are to be located. iv. No such building or part thereof shall be erected with less than a 50-foot front yard or nearer than 25 feet from any other street or property line. v. The sum of all areas covered by all principal and accessory buildings shall not exceed 20 percent of the area of the lot. vi. Courts shall conform to the requirements of article 5, section 3 hereof.

(b) Railroad and public utility rights-of-way and structures necessary to serve areas within the city, subject to such conditions as the planning commission may impose in order to protect and promote the health and safety and general welfare of the community and the character of the neighborhood in which the proposed structure is to be constructed.

(c) Country clubs or other annual membership clubs, catering exclusively to members and their guests, and accessory private playgrounds, golf courses, swimming pools, tennis courts and recreation buildings not conducted as business enterprises, provided that the following operations shall be prohibited: i. Outdoor entertainment, live or mechanical; ii. The use of outdoor public address systems for any purpose; and iii. Exterior lighting producing glare at the lot line other than that essential for the safety of the users of the premises.

37

Paj 38

Item 2.
AX-26-01 Lands of Fuller at 7 Nixon Ln: Annexation
DAC Report of February 4, 2026

No building erected under the provisions of this paragraph [subsection 1.14(c)] shall be so erected nearer than 50 feet to any street or property line. (d) Adult day care facilities in accordance with Article 5—Supplementary Regulations, Section 22—Adult Day Care Facilities.

1.15 Accessory uses, limited to the following: (a) Professional office or studio of an artist, dentist, musician, teacher, or physician, but not including veterinarians, provided that: i. Such office or studio is incidental to the residential use of the premises and is carried on by a resident thereon with not more than one nonresident assistant; and ii. Such office or studio shall occupy not more than 30 percent of the area of one floor of the main building. iii. Studios where dancing or music instruction is offered to groups in excess of four pupils at one time or where concerts or recitals are held are prohibited. iv. Medical centers, barbershops, beauty parlors, real estate offices, funeral homes or similar uses shall not be considered permitted accessory uses.

(b) Garden house, tool house, playhouse, greenhouse or pool incidental to the residential use of the premises and not operated for gain.

(c) Private garage, provided that, in the case of a one-family dwelling, such garage shall have a capacity of not more than three passenger automobiles. One such space may be leased to a person not [a] resident on the premises.

(d) Keeping domestic animals as pets, provided not more than three (3) dogs over six months old, shall be permitted.

(e) Keeping of chickens for individual domestic purposes subject to the following restrictions: i. Keeping of chickens shall not be permitted on lots smaller than 10,890 square feet in lot area. ii. No more than five (5) chickens shall be permitted on a residential lot. iii. Chickens shall be registered with the Delaware Department of Agriculture. iv. Chickens shall be penned in a coop that shall be at least four (4) square feet per chicken. v. All chicken coops shall be located in a rear yard and shall be a minimum of 20 feet from side and rear property lines. vi. Any odor associated with the chickens shall not be discernable from property lines. vii. Keeping of roosters shall be prohibited. viii. Any lot with chickens shall either comply with these requirements by June 1, 2016 or remove the chickens.

(f) Dormitories accessory to schools, provided that such dormitories conform to the bulk regulations of the RG-1 zone. For purposes of computing bulk requirements, each four rooms shall be considered one dwelling unit. Parking shall be calculated as identified in Article 6—Off- Street Parking, Section 3—Required off-street parking spaces, Paragraph 3.1—Schedule of requirements.

(g) Customary home occupations, provided that: i. No display of products, goods and/or signs shall be visible from the street. ii. Such home occupation shall be incidental and secondary to the residential use of the premises and shall be conducted in the principal building by the resident or residents that reside therein. iii. Nonresident assistants or co-workers shall be prohibited. iv. Such home occupation shall not occupy more than 30 percent of the area of one floor in the principal building. v. There shall be no exterior effect such as noise, traffic, odor, dust, smoke, gas, fumes, radiation, or electromagnetic interference.

38

Paj 39

Item 2.
AX-26-01 Lands of Fuller at 7 Nixon Ln: Annexation
DAC Report of February 4, 2026

IV. RECOMMENDATION OF PLANNING STAFF:

The request for the R-8 (One Family Residence Zone) is for a zone that focuses on one-family residences (detached dwellings) on lots of a minimum 8,000 SF size. Staff recommends the annexation of the property at 7 Nixon Lane and its rezoning to R-8 (One Family Residence Zone) be approved as requested. The subject property is in the City’s Annexation Plan of the 2019 Comprehensive Plan as Category 1: High Priority Annexation Areas with a Land Use Classification as Residential Medium Density. This is a High Priority Annexation Area since it is an enclave and will help fill in one of the holes in the City of Dover Boundary. The R-8 zoning is consistent with other development in the area surrounding this parcel which include a number of residential zones such as R-20 to R-8 and RM-1 zones. The R-8 zoning accommodates the current use of the property as a single-family dwelling and allows for future subdivision and development of the northern portion of the property. The property is also already served by the City electric. This Annexation/Rezoning Request does not grant approval of a specific use for the property but makes its land use subject to a listing of uses permitted and potential conditional uses as allowed in the R-8 zoning district. Staff notes that any potential redevelopment for the site or changes of use for the existing building would have to be in line with the zoning classification and would similarly have to follow all development design guidelines of the Zoning Ordinance. Were the Application for Annexation/Rezoning to be recommended by the Planning Commission and subsequently approved by the City Council, the applicant would still have to submit Site Development Plans, Subdivision Plans, and/or Permits for review for any new use of the site or the building. At the present time, the property is expected to remain as a single family detached residence with the only improvements related to making connections to City water and/or sewer services as needed. There is potential for a future subdivision of the parcel into multiple lots.

The parcel meets the lot dimensions for a parcel zoned R-8 and the current dwelling appears to comply with the bulk standards for setbacks and lot coverage. Any non-conformity of the existing buildings’ uses and placement regarding the bulk standards of the R-8 would be subject to the provisions of the Zoning Ordinance, Article 7 – Nonconforming Buildings and Uses. This recommendation is being made without the benefit of hearing the comments of surrounding landowners and residents. A Public Hearing is required on this matter and the Planning Commission should give those comments consideration.

  • V.PLANNING COMMISSION REVIEW FOR RECOMMENDATION As part of the Annexation Request, the City of Dover zoning district is to be determined; therefore, it is a request for a type of zoning map amendment which changes the zoning district of a property. The Planning Commission as part of their public hearing and review process will provide a recommendation on the zoning to City Council. As part of the process outlined in Zoning Ordinance, Article 10 Section 5, the Planning Commission must evaluate the following factors when considering the request:

39

Paj 40

Item 2.
AX-26-01 Lands of Fuller at 7 Nixon Ln: Annexation
DAC Report of February 4, 2026

Article 10 § 5.36 Report of the planning commission. Regarding each application for a zoning map amendment, the planning commission shall provide a report to the city council stating a recommended action with regards to the proposed amendment, along with the commission's evaluation of the following factors:

(A) Whether the uses permitted by the proposed change would be compatible with the existing uses and zones in the area concerned;

(B) Whether adequate public services and infrastructure exist or can be created or expanded to serve the needs of any additional demand as a result of such change; and

(C) Whether the proposed change is in accordance with the city's current comprehensive plan.

A Recommendation Report from the Planning Commission will be forwarded to City Council for their consideration of the Annexation/Rezoning Application.

ADVISORY COMMENTS TO THE APPLICANT

  • 1)From the agency comments received, it appears that ability to provide City water and sewer is feasible due to the proximity to existing infrastructure along Nixon Lane. It would be the property owner’s responsibility to cover all costs associated with extending and connecting services to the existing dwelling.
  • 2)Regarding connection to City services (water and/or sanitary sewer) the applicant must contact the City’s Department of Water & Wastewater for procedures, permitting and impact fees.
  • 3)Upon annexation into the City of Dover, the property will be subject to the provisions of the Dover Code of Ordinances. This includes procedures such as review processes for plans for redevelopment or subdivision and permits for construction activities, licensing, etc.
  • 4)The applicant shall be aware that approval of any Annexation & Rezoning application does not represent a Building Permit or other construction activity permit approval. A separate application submission showing all improvements is required before issuance of permits by the City of Dover.

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Office as soon as possible.

40

Paj 41

Item 2.

CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JANUARY 28, 2026

APPLICATION: Lands of Fuller at 7 Nixon Lane FILE #: AX-26-01 REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater CONTACT PHONE #: 302-736-7025 CONTACT EMAIL: jlyon@dover.de.us

T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .

T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :

CITY AND STATE CODE REQUIREMENTS

SANITATION / STREETS / STORMWATER / WATER / WASTEWATER / GENERAL

  • 1.Our office has no objections to the proposed annexation of tax parcel ED-00-068.19-01-28.00-000. Any redevelopment shall adhere to the City of Dover Water/Wastewater Handbook and the Specifications, Standards & Procedures for Public Works Construction. Impact fees will be applied to this property.

RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES SANITATION / STREETS / STORMWATER / WATER / WASTEWATER / GENERAL 1. None

ADVISORY COMMENTS TO THE APPLICANT

SANITATION / STREETS / STORMWATER / GENERAL

  • 1.None WATER / WASTEWATER
  • 1.As per the Petition to Annex and Rezone Property, as heard by the Council Committee of the Whole, please find the following:
  • a.7 Nixon Lane is not served by City of Dover Water. 7 Nixon Lane is not served by Sanitary Sewer. The property owner has not contacted the Department about the possible connection to these services. Water and Sanitary Sewer are available to this property. The property owner is responsible for any and all costs associated with extending and providing service upgrades to the property. This may include, but not limited to, tapping the sanitary sewer and water mains, connection to the building for both utilities, purchasing appropriately sized water meter and pit, paying impact fees, and obtaining permits.

I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .

41

Paj 42

C F
AX-26-01
Item 2.
I I
T R
CITY OF DOVER Y E

DEVELOPMENT ADVISORY COMMITTEE O M

F A APPLICATION REVIEW COMMENTARY R D.A.C. MEETING DATE: 01/28/26 D S O H V A E L R APPLICATION: Lands of Fuller at 7 Nixon Ln

FILE #: AX-26-01 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal

CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457 josika@dover.de.us

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.

THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE APPLICANT:

CITY AND STATE CODE REQUIREMENTS:

  • 1.Proposal is an annexation and rezoning request. This office has no objections.
  • 2.Every house, building or structure used or intended for use as living quarters or as a place for conducting business, and having any wall facing or abutting any public or private street or alley, shall have displayed on that wall, in legible, easily read characters which are of contrasting color to the background, the proper street number for such house, building, or structure in accordance with the following:

One-family and two-family residential structures, height, the number shall measure a minimum of four inches in height, location, the number shall be placed on the house above or to the left or right of the front entrance, color, the number shall be contrasting to the background color, Arabic numerals, all numbers shall be Arabic numerals.

Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when identifying individual apartments with exterior doors, and 12 inches when identifying buildings with apartment complexes where there are two or more buildings not assigned street addresses. Individual buildings with street addresses shall have numbers measuring six inches, location, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot, color, numbers shall be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic numerals.

42

Paj 43

Item 2.

Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in height, location generally, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot,

property line or driveway, should the building be located far enough from a public or private road so that the numbers are not clearly visible from the street, then the street address shall also be posted on the property at or near the property line or driveway to said building,

color; each building, numbers shall be contrasting to the background color and shall be placed on each building in the complex,

Arabic numerals, all numbers used shall be Arabic numerals,

Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number affixed to the front of the tenant space and on the outside of the rear door which corresponds with that tenant space. Numbers shall measure six inches in height. (City of Dover Code of Ordinances, 98-344)

ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:

  • 1.N/A

APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):

2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association) 2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association) 2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association) 2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association) 2009 IBC (International Building Code) Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations 2021 Delaware State Fire Prevention Regulations City of Dover Code of Ordinances

*If you have any questions or need to discuss any of the above comments, please call the above contact person listed.

43

Paj 44

Item 2.

From: Mobley, Will (DelDOT)
To: Melson-Williams, Dawn; Schwartz, Joshua (DelDOT)
Subject: EXTERNAL: DAC Comments 28 Jan 26 Staff Development Meeting
Date: Wednesday, January 28, 2026 5:04:46 PM

WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning,

Here are the comments from DelDOT for the applications discussed in the DAC Committee Meeting.

AX-26-01 Lands of Fuller at 7 Nixon Ln
No objection to annexation.

AX-26-02 Lands of United Worldwide Express, LLC at 1624 North Little Creek Rd and Adjacent Two Parcels No objection to annexation.

Z-26-01 Lands of United Worldwide Express, LLC at 1600 North Little Creek Rd and Adjacent Parcel at 0.509 AC North Little Creek Road No objection to rezoning.

C-26-01 Bay Pointe Apartments (One Building Concept) at 1100 Bay Road This project has an Entrance Plan Approval dated 5-10-23. Plan approval expires 5-10- 26. Plans will need reapproval if no work is started before expiration date.

US-26-01 Dover Industrial Park Comprehensive Signage Plan Ensure planned sign structure is outside of DelDOT Right of Way. At a minimum the sign must be placed outside the clear zone of the state maintained frontage road and must not fall within the sight distance triangle located at the site entrance. Lastly Delaware Code 17 § 1108 Location and condition of advertising regulated. ---(a) Subject to subsection (c) of this section, no outdoor advertising sign, display or device, except a directional, gateway, or warning sign, official sign or notice erected by or with the approval of the Department, shall be erected subsequent to July 14, 1969, within 25 feet of the right-of-way line of any public highway if visible from any portion of the same.

44

Paj 45

Item 2.

Sincerely,
Will T Mobley III, PMP
Division of Economic Development, DELDOT
Interim Kent County Review Coordinator
Phone (302)-760-2409
Will.mobley@delaware.gov

45

Paj 46

KENT CONSERVATION DISTRICT

Item 2.

1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG

CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
FEBRUARY 2026

APPLICATION: Lands of Fuller at 7 Nixon Ln
FILE #: AX-26-01
REVIEWING AGENCY: Kent Conservation District
CONTACT: Cullen Baker
PHONE: 302-608-5370
EMAIL: stormwater@kentcd.org

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:

Source: 2019 Delaware Sediment and Stormwater Regulations

CITY AND STATE CODE REQUIREMENTS:

Kent Conservation District has no objection to the annexation & rezoning request for the above referenced parcel.

ADVISORY COMMENTS TO THE APPLICANT:

In the future, if there is any proposed disturbance that will exceed 5,000 square feet, a sediment and stormwater management plan must be reviewed and approved by our office prior to any land disturbing activity (i.e. clearing, grubbing, filling, grading, etc.).

46

Paj 47

Item 2.

CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
ADVISORY BRIEF Planning
D.A.C. MEETING DATE: 2/4/2026 Organization

AX-26-01 Lands of Fuller at 7 Nixon Ln

FILE # AX-26-01 REVIEWING AGENCY: Dover/Kent County MPO

CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030

Attached, please find comments submitted by Dover Kent MPO for each of the current City of Dover Development Advisory Committee (DAC) applications. These comments are a part of the MPO’s ongoing goals of promoting transportation safety and connectivity within the region. They are submitted in accordance with the support given by the MPO Council on November 6, 2024.

Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be waived.

City of Dover Planning Commission
Annexation and Zoning Review

AX-26-01 Lands of Fuller at 7 Nixon Ln

The MPO has no objections to the Annexation Request and Rezoning Request. Further comments will be provided if changes to the property, such as subdivision or site development, take place at a later date.

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.

47

Paj 48

Item 2.

48

Paj 49

Item 2.

49

Paj 50

Item 3.

City of Dover
PETITION TO ANNEX AND REZONE PROPERTY
Development Advisory Committee Meeting of February 4, 2026
Public Hearing Before Planning Commission on February 17, 2026

File Number: AX-26-02

Ordinance Number: 2025-24

Applicant/Owner of United Worldwide Express, LLC Record:

Property Address: 1624 North Little Creek Road, Dover DE
Tax Parcel ID #: ED-00-068.20-01-15.00-000
Lot Size: 5.12 acres +/-
Present Zoning: IL (Limited Industrial Zone)
RMH (Residential Manufactured Home Zone)

Property Address: Unaddressed Parcel south of North Little Creek Road
Tax Parcel ID #: ED-00-077.00-01-07.00-000
Lot Size: 3.15 acres +/-
Present Zoning: RMH (Residential Manufactured Home Zone)

Property Address: Unaddressed Parcel west of State Route 1
Tax Parcel ID #: ED-00-077.00-01-07.01-000
Lot Size: 0.48 acres +/-
Present Zoning: RMH (Residential Manufactured Home Zone)

Proposed Zoning: IPM (Industrial Park Manufacturing Zone) AEOZ (Airport Environs Overlay Zone): APZII – Accident Potential Zone II

2019 Comprehensive Category 1: High Priority Annexation Areas Plan Designation:

2019 Comprehensive Office and Office Park
Plan Land Use Category:

Present Use: Storage/Warehouse Buildings and Vacant Lots

Proposed Use: Future Redevelopment (for Mini-Storage Buildings)

Utility Availability: Electric: 1624 N. Little Creek Road is currently served by City of Dover Electric. As the following parcels of the Unaddressed Parcel of 3.15 acres on N. Little Creek Road and the Unaddressed Parcel of 0.48 acres west of State Route 1 are

50

Paj 51

Item 3.

undeveloped and woodland areas, they likely do not have
specific City of Dover Electric services at the present time.
With any future redevelopment of the properties, the electric
service needs will be evaluated. The property owner will be
responsible for any and all costs associated with the changes in
electrical service needs related to any future redevelopment
including extending and providing service upgrades to the
proposed properties.

Water and Sanitary Sewer: 1624 N. Little Creek Road is not currently served by City of Dover Water. Unaddressed Parcel of 3.15 acres on N. Little Creek Road is not currently served by City of Dover Water. Unaddressed Parcel of 0.48 acres west of State Route 1 is not currently served by City of Dover Water.

1624 N. Little Creek Road is not currently served by City of
Dover Sanitary Sewer. Unaddressed Parcel of 3.15 acres on N.
Little Creek Road is not currently served by City of Dover
Sanitary Sewer. Unaddressed Parcel of 0.48 acres west of State
Route 1 is not currently served by City of Dover Sanitary
Sewer.

The property owner has not contacted the Department about the possible connection to these services. Water is available to these properties. The property owner is responsible for any and all costs associated with extending and providing service upgrades to the property area. Sanitary Sewer is not immediately available to this property area; the developer may reach out to Kent County Public Works to see if the connection is more feasible. The property owner is responsible for any and all costs associated with extending and providing service upgrades to this property area. This may include tapping the sanitary sewer and water mains, connection to the building for both utilities, purchasing appropriately sized water meter and pit, paying impact fees, and obtaining permits.

Staff Recommendation The Electric Department has no objection to the annexation. for AX-26-02: The Department of Water and Wastewater has no objection to the annexation.

  • P.O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 51

Paj 52

Item 3.
City of
CITY OF DOVER Dover
Planning
Office
DEVELOPMENT ADVISORY COMMITTEE

APPLICATION REVIEW COMMENTARY

D.A.C. MEETING DATE: February 4, 2026

APPLICATION: Annexation of Lands of United Worldwide Express, LLC at 1624 North Little Creek Road, Dover DE

FILE #: AX-26-02 REVIEWING AGENCY: City of Dover Planning

CONTACT PERSON: Dawn Melson-Williams, AICP, Principal Planner PHONE #: (302) 736-7196

Note: This Review Report was initially prepared by Staff of the Rossi Group (under a Planning Services contract with the City of Dover). The DRAFT Report was completed with additional review and editing by the City’s Planning Office.

  • I.APPLICATION SUMMARY Review of an Annexation Request and Rezoning Request for three parcels of land of 5.12 Acres +/-, 3.15 acres +/-, and 0.48 acres +/- located at 1624 North Little Creek Road and the two parcels to the south. The main parcel is currently zoned IL – Limited Industrial Zone and RMH – Residential Manufactured Home Zone in Kent County. The other two parcels are currently zoned RMH – Residential Manufactured Home Zone in Kent County. The proposed Zoning for all parcels is IPM (Industrial Park Manufacturing Zone) and subject to the AEOZ (Airport Environs Overlay Zone): APZ II - Accident Potential Zone II. The properties are located on the south side of North Little Creek Road and adjacent to State Route 1. The annexation category according to Dover’s 2019 Comprehensive Plan is Category 1: High Priority Annexation Area and the land use designation is Office and Office Park. The property owner is United Worldwide Express, LLC. Property Addresses: 1624 North Little Creek Rd and two unaddressed parcels. Tax Parcels: ED-00-068.20-01-15.00-000, ED-00-077.00-01-07.00-000, and ED-00-077.00-01-07.01-000. Proposed Council District 2. Ordinance #2025-24.

Existing Properties The properties are located on the south side of North Little Creek Road, immediately west of State Route 1. The subject parcels are contiguous to the City boundary along the west property line. The adjoining parcels to the northwest are within the City and planned to be developed along with the subject parcels. The northernmost property has a structure on it with the southern property area being wooded. Surrounding Land Uses Rojan Meadows is immediately west of the subject properties and is zoned RM-1. State Route 1 is immediately to the east, outside of the City boundary. The property north across North Little Creek Road is the right-of-way for State Route 1. The abutting property to the northwest on the south side of North Little Creek Road is the subject of Rezoning Application Z-26-01, to rezone from C- PO (Commercial and Professional Office Zone) to IPM (Industrial Park Manufacturing Zone), and

52

Paj 53

Item 3. AX-26-02 Lands of United Worldwide Express LLC at 1624 North Little Creek Road DAC Report of February 4, 2026

it planned to be developed in conjunction with the subject properties. Parcels surrounding the subject property on all sides are within the AEOZ (Airport Environs Overlay Zone): APZ II - Accident Potential Zone II as are the subject properties.

II. COMPREHENSIVE PLAN COMPLIANCE REVIEW

In the 2019 Comprehensive Plan, the Potential Annexation Areas (Map 13 -1) identifies the property in the Category 1: High Priority Annexation Areas. The Growth and Annexation Plan Chapter (Chapter 13) notes that “Lands in this category are primarily enclaves of unincorporated territory mostly surrounded by the City of Dover. In all or most of these cases, the City provides these parcels with one or more essential service (sewer, water, police, fire, trash).” For Category 1: High Priority Annexation Areas, it notes in the Recommendations that “the City will not extend sewer and/or water infrastructure to Category 1 areas unless the property owners annex into the City” with consideration given for issues of health, safety and welfare. The 2019 Comprehensive Plan also sets the review criteria for the review of zoning for parcels being proposed for annexation. Chapter 13, page 13-9 notes that the Zoning Review may include:

  • •Proposed zoning be in compliance with the land use category shown on Map 13-2 and used in conjunction with Table 12-1: Land Use and Zoning Matrix;
  • •Character and compatibility of the surrounding land uses and properties;
  • •The street type and capacity serving the property;
  • •Environmental concerns and conditions that may influence land use and zoning;
  • •Market concerns and conditions;
  • •The compatibility with the overall goals of the Comprehensive Plan.

Map 13-2: Potential Land Use for Annexation Areas identifies the Land Use Classification for this property to be Office and Office Parks. It is also located within the zoning district of AEOZ (Airport Environs Overlay Zone) surrounding the Dover Air Force Base. The 2019 Comprehensive Plan describes strategies and recommendations for Employment Centers, which includes office and industrial uses. It also includes strategies and recommendations related to the Dover Air Force Base. The associated goals and policies are listed in the 2019 Comprehensive Plan excerpts presented below (pages 12-16 through 12-20); see excerpt below:

EMPLOYMENT CENTERS: OFFICE PARK AND INDUSTRIAL

LAND USES

To a large extent, Dover’s character has been set by the historic location of key uses throughout the City, from the governmental complexes in the center, to rail dominate uses along the railroad right-of-way, to military uses at Dover Aire Force Base (DAFB). Today, office parks and industrial land uses are areas partially or completely occupied by existing industrial and/or manufacturing uses. A large area of vacant developable land north of and adjoining Dover Air Force Base has been designated for industrial and manufacturing uses. Such uses are generally more compatible with military operations and seem to be less effected by noise associated with military overflights. Other areas for employment centers are adjacent to transportation routes (vehicle and rail). See Chapter 10 – Economic Development) for a more detailed discussion of Dover’s economic opportunities.

53

Paj 54

Item 3. AX-26-02 Lands of United Worldwide Express LLC at 1624 North Little Creek Road DAC Report of February 4, 2026

Assumptions: Employment Centers 1. The Dover community is fortunate to harbor several regional, national and international industry leaders within the City limits. Dover intends to accommodate the reasonable aspirations and expectations of its industrial and manufacturing community to support the vitality of these precious resources.

  • 2.A healthy and well-rounded local economy will depend upon diversity in business and employment opportunities.
  • 3.Opportunities exist to build on Dover’s regional proximity for warehousing and distribution and its access to Dover Air Force Base (DAFB) for expansion of civilian air transportation and aviation related manufacturing, service and repair functions.

Goal: Employment Centers Create a more vibrant, growing economy with a broader range of job opportunities through collaborative efforts to market the region, identify potential targets, and respond to opportunities to foster an increase in office and industrial development in appropriate and designated areas.

Policies: Employment Centers 1. Protect existing industrial, office park and manufacturing establishments from encroachment by incompatible land uses which could result in nuisance complaints, hazardous situations, and human conflict.

  • 2.Provide sufficient land area for industrial purposes to enable the expansion of existing industries, the establishments of new facilities, and revitalization of underutilized older industrial sites.
  • 3.Provide for a variety of office park and industrial development opportunities through the designation of areas for small, medium and large establishments within planned industrial parks.
  • 4.Promote alternative modes of accessibility including pedestrian and bicycle facilities, bus shelters and transit stops, and provide incentives for car and van pooling of employees.
  • 5.Create flexible and contemporary industrial zoning provisions that reflect emerging trends in uses, facilities, and business opportunities to meet future needs.

Recommendations: Employment Centers The City is committed to fostering a strong, vibrant, and balanced local economy built on existing and new business locations. This initiative requires close coordination with state and county economic development entities. It also requires continuous attention to the needs of existing businesses, efforts to promote a skilled

54

Paj 55

Item 3. AX-26-02 Lands of United Worldwide Express LLC at 1624 North Little Creek Road DAC Report of February 4, 2026

workforce, a comprehensive marketing and promotional strategy, and land use and development regulations that are efficient and contemporary. The Comprehensive Plan designates areas throughout the City where job growth and opportunities are encouraged. Plan Chapter 10 – Economic Development lays out a set of goals and actions designed to reinforce this commitment.

Office Parks The Land Development Plan designates specific tracts of land of various sizes for Office and Office Park land uses. Office Park development involves an integrated development of office buildings with shared entrances, driveways and parking. The majority of uses permitted within an Office Park are generally weekday professional office uses involving very little or no activity at night or on weekends. For this reason, the Office Park designation may be viewed as a transitional use category when situated between more intense commercial and industrial land uses and residential land uses. This designation usually involves the C-PO (Commercial/Professional Office Zone) zoning district. These areas are located throughout the City with established office concentrations in the Enterprise Business Park, along Silver Lake Boulevard, on College Park Drive, along Old Rudnick Lane, the Northgate Center, and elsewhere. Scattered office uses are also located along Saulsbury/McKee Road and within designated “Mixed Use” areas in the Eden Hill Farm Traditional Neighborhood Design (TND). Smaller scale areas for office parks are the Woodbrook complex on South Governors Avenue, office complexes along Walker Road, and areas along Route 8.

Large Scale Industry The Land Development Plan designates all existing major industrial facilities and associated vacant lands for Industrial use. These properties include the manufacturing facilities of Kraft Heinz Foods, Proctor & Gamble, Edgewell Personal Products, PPG Industries, General Metalcraft and others.

Industrial Parks Several planned industrial parks have been initiated since 1986 which offer industrial development potential. The Land Development Plan designates these sites for continued Industrial use. These sites include Kent County Aero Park/Air Cargo Terminal, Enterprise Business Park, College Business Park, and McKee Business Park. The City purchased and has developed the Garrison Oak Business and Technology Center (formerly the Garrison Oak Technical Park) in 1999-2000. It now houses a solar electric facility, an electric generating facility, a flooring products manufacturer, and a security firm with ten shovel ready lots remaining available. Planning is underway to extend the Joint Use Agreement with Dover Air Force Base to allow expansion of the Kent County Aero Park into a regional facility. The Central Delaware Aviation Complex will facilitate aviation uses including air cargo, aircraft maintenance and repair, and related uses as part of a newly designated “Employment Center.”

55

Paj 56

Item 3. AX-26-02 Lands of United Worldwide Express LLC at 1624 North Little Creek Road DAC Report of February 4, 2026

DOVER AIR FORCE BASE

Although Dover Air Force Base (DAFB) is within the City limits, as a land holding of the Federal government it is not subject to municipal regulation. In recognition of the strategic importance of DAFB with respect to the national interest, as well as the contributions of DAFB to the local economy and overall image of Dover, it is essential that the Comprehensive Plan support and protect the vital interests of Dover Air Force Base as an integral part of Dover. A majority of the land area surrounding DAFB is within the City limits. Much of this land is impacted by noise associated with base operations and specific locations in close proximity to aircraft runways have been identified by the Department of Defense as accident potential zones. It is within these areas that Dover can play an important role in protecting the mission of DAFB by restricting development within these areas to uses that would be relatively compatible with military operations. The Airport Environs Overlay Zone (AEOZ) was adopted in 2001 and revised in 2013 following the Air Installation Compatible Use Zone Study Update from August 2010. By virtue of a Joint Use Agreement and a dedicated taxiway access to the base runway and air traffic control capabilities, a connection to the Base for civilian aircraft use is available. Operated by the Delaware River and Bay Authority on behalf of DelDOT and adjacent to the Kent County Aeropark, the Civil Air Terminal represents a significant resource for future development of aviation and aeronautic business opportunities.

Assumptions: Dover Air Force Base 1. Dover Air Force Base influences the Dover community in many positive ways. Its benefits include positive economic impacts through employment and commerce. Skilled military personnel and their families from all over the country come to Dover and become an important part of our community. Dover residents also take great pride in the important role Dover Air Force Base plays in the defense of our nation and its peacekeeping and emergency relief efforts.

  • 2.The connection to the Base for expansion of adjacent public and private air-related uses is an important, long-term opportunity for the City and Kent County.

Goal: Dover Air Force Base Create a favorable and compatible environment for Dover Air Force Base through a resolute commitment to provide all reasonable planning accommodations to protect the Base.

Policies: Dover Air Force Base 1. Restrict land uses surrounding Dover Air Force Base to uses defined in the most current edition of the Air Installation Compatible Use Zone (AICUZ) document produced by the United States Department of Defense.

56

Paj 57

Item 3. AX-26-02 Lands of United Worldwide Express LLC at 1624 North Little Creek Road DAC Report of February 4, 2026

  • 2.Require special noise attenuation measures to be incorporated within plans for the construction of new buildings in the vicinity of Dover Air Force Base.
  • 3.Maintain the designated Airport Environs Overlay Zone (AEOZ) which includes the Accident Potential Zones and Noise Zones as defined by the Air Installation Compatible Use Zone (AICUZ) document. This ordinance sets forth regulations within the Zoning Ordinance governing land use and development within these areas (Article 3 Section 22). The boundaries of the AEOZ may be updated in the future to coincide with the most current edition of the AICUZ document.
  • 4.Ensure cooperative planning to facilitate joint use activities in a manner that protects the Base operations while achieving associated economic benefits.

Recommendations: Dover Air Force Base The Land Development Plan reflects the existing limits of Dover Air Force Base for location purposes. No enlargement of the land use area associated with DAFB is proposed at this time. Areas immediately north of DAFB within the City limits have been designated for Industrial uses, focused on air cargo and other aviation- based uses. A few small pockets of existing residential development exist north of DAFB along Horsepond Road and Lafferty Lane. The Land Development Plan shows this area as Industrial, primarily because the AEOZ (Airport Environs Overlay Zone) prohibits new residential uses in this area. The City will not rezone active residential properties until or unless the residential use ceases on that property. Portions of the adjacent industrial lands and other lands will be considered for rezoning to a newly established IPM3 (Industrial Park Manufacturing – Industrial Aviation and Aeronautics Center) zone as master planning for the area continues. As part of the Land Development Plan, Table 12-1: Land Use and Zoning Matrix specifies that the following zones are compatible with this land use classification of Office and Office Parks.

CPO (Commercial and Professional Office)
Office and Office Parks IO (Institutional and Office)
IPM (Industrial Park Manufacturing)
RGO (General Residence and Office)

III. ZONING REVIEW

Request for IPM (Industrial Park Manufacturing Zone) The applicant has requested the zoning of IPM (Industrial Park Manufacturing Zone). The following code excerpt of the IPM zoning district is provided from Article 3 §20 of the Zoning Ordinance.

57

Paj 58

Item 3. AX-26-02 Lands of United Worldwide Express LLC at 1624 North Little Creek Road DAC Report of February 4, 2026

Article 3 Section 20. Industrial park manufacturing zone (IPM). 20.1 Uses permitted. No building or premises shall be used and no building or part of a building shall be erected, which is arranged, intended or designed to be used, in whole or in part, for any purpose, except the following, and in accordance with performance standards procedure as set forth in article 5, section 8, and subject to site development plan approval as set forth in article 10, section 2: 20.11 Manufacturing, assembling, converting, altering, finishing, cleaning, cooking, baking or any other type of manufacturing or industrial processing of any goods, materials, products, instruments, appliances and devices, provided that the fuel used shall be oil, gas or electricity; together with incidental clinics, cafeterias and recreational facilities for the exclusive use of employees of the concern engaged in such undertaking. 20.12 Research, design, testing and development laboratories. 20.13 Printing, publishing, binding, packaging, storage, warehousing, transshipment and distribution, and trucking terminals. 20.14 Business, professional or administrative offices; banks and financial institutions; hotels, motels and restaurants; public parks, playgrounds, and recreational facilities; and public utility uses, provided that these uses shall only be located upon a thoroughfare, arterial street or access highway with[in] the IPM zone. Retail sales and service establishments within planned industrial parks for local needs and local consumption of the employees and customers of the other permitted uses within the planned industrial park. 20.15 Signs shall meet the regulations found in article 5, section 4, supplementary sign regulations. 20.16 Agricultural or farm uses as defined and permitted in article 3, section 1.11. 20.17 The following uses may be permitted as conditional uses if approved by the planning commission in accordance with the provisions and procedures set forth in article 10, section 1 and any specified requirements set forth below: (a) Associated retail uses in conjunction with and accessory to a permitted use, provided that the associated retail use does not occupy more than 30 percent of the gross floor area of the building or group of buildings on a lot. Parking shall be provided at a rate of one parking space per 300 square feet of retail space for the exclusive use of retail customers in addition to the bulk parking requirements of this zoning district for a particular use. 20.18 Mini-storage facilities, subject to the following regulations: (a) No unit shall be placed within 30 feet of any other structure on the lot or a residential property line. (b) No outside storage [is allowed], except for recreational vehicles, boats or personal automobiles when completely screened from view and parked in specifically approved locations. Parking for these vehicles shall not count toward the required parking set forth in subsection (e) below. (c) No individual unit may be used for retail, garage sale or any other commercial activities. (d) No storage of flammable, explosive, corrosive or other hazardous products may occur in the individual unit. (e) Parking must be provided at a ratio of one space for each 25 rental units, plus a minimum of three spaces for an office outside of the enclosure. One row of parallel parking is permitted between buildings at a ratio of one space per 25 feet. (f) All other bulk requirements of this ordinance are met. 20.19 Marijuana cultivation facilities, marijuana manufacturing facilities, and marijuana testing facilities, subject to the requirements outlined in article 5, section 24.

20.2 Uses prohibited. The following uses are specifically prohibited: 20.21 Residences, except those existing at the time of adoption of this amendment.

58

Paj 59

Item 3. AX-26-02 Lands of United Worldwide Express LLC at 1624 North Little Creek Road DAC Report of February 4, 2026

20.22 Manufacturing uses involving primary production of the following products from raw materials: asphalt, cement, charcoal, and fuel briquettes; chemicals: aniline dyes, ammonia, carbide, caustic soda, cellulose, chlorine, and carbon black and bone black, creosote, hydrogen and oxygen, industrial alcohol, nitrates (manufactured and natural) of an explosive nature, potash, plastic materials, and synthetic resins, pyroxylin, rayon yarn, and hydrochloric, nitric, phosphoric, picric, and sulphuric acids: coal, coke, and tar products, including gas manufacturing; explosives; fertilizers; glue, and size (animal); linoleum and oil cloth; matches; paint, varnishes, and turpentine; rubber (natural or synthetic); [and] soaps, including fat rendering. 20.23 The following processes: nitrating of cotton or other materials; magnesium foundry; reduction, refining, smelting, and alloying of metal or metal ores; refining secondary aluminum; refining petroleum products, such as gasoline, kerosene, naphtha, [and] lubricating oil; distillation of wood or bones; [and] reduction and processing of wood pulp and fiber, including papermill operations. 20.24 Operations involving stockyards, slaughterhouses, and slag piles. 20.25 Storage of explosives, [and] bulk or wholesale storage of gasoline above [the] ground. 20.26 Dumps. 20.27 Quarries, stone crushers, screening plants, and storage of quarry screenings, accessory to such uses. 20.28 Junkyards, automobile dismantling plants or storage of used parts of automobiles or other machines or vehicles or of dismantled or junked automobiles.

AEOZ (Airport Environs Overlay Zone) The properties are located within the AEOZ – APZ-II (Accident Potential Zone II) found in Article 3 §22.3 of the Zoning Ordinance, and therefore, this zoning classification must be assigned upon annexation. The AEOZ includes prohibition of certain uses that are incompatible with the Dover Air Force Base operations, specifically regarding noise and accident potential; see Zoning Ordinance, Article 3 §22.6.

IV. RECOMMENDATION OF PLANNING STAFF:

The request for the IPM (Industrial Park Manufacturing Zone) is for a zone that allows for offices, industrial, and mini-storage facility uses. Staff recommends the annexation of the three properties located at 1624 North Little Creek Road and the adjacent two parcels to the south and for the associated rezoning to IPM (Industrial Park Manufacturing Zone) and AEOZ-APZII (Airport Environs Overlay Zone – Accident Potential Zone II) be approved as requested. The subject property is in the City’s Annexation Plan of the 2019 Comprehensive Plan as Category 1: High Priority Annexation Areas with a Land Use Classification as Office and Office Park. While the subject property is not an enclave that is fully surrounded by the City, it fills a hole between the existing City boundary and the State Route 1 right-of-way. The main parcel of the three properties is also already served by the City electric. This Annexation/Rezoning Request does not grant approval of a specific use for the property but makes its land use subject to a listing of uses permitted and potential conditional uses as allowed in the IPM zoning district. Staff notes that any potential redevelopment for the site or changes of use for the existing building would have to be in line with the zoning classification and would similarly have to follow all requirements of the Zoning Ordinance. Were the Application for Annexation/Rezoning to be recommended by the Planning Commission and subsequently

59

Paj 60

Item 3. AX-26-02 Lands of United Worldwide Express LLC at 1624 North Little Creek Road DAC Report of February 4, 2026

approved by the City Council, the applicant would still have to submit Site Development Plans or Subdivision Plans and/or Permits for review for any new use of the site or the existing building.

The parcels, when combined with the adjacent parcels already within the City, meet the lot dimensions for IPM zone related to conventional lots. Any non-conformity of the existing buildings’ uses and placement in relation the bulk standards of the IPM would be subject to the provisions of the Zoning Ordinance, Article 7 – Nonconforming Buildings and Uses. This recommendation is being made without the benefit of hearing the comments of surrounding landowners and residents. A Public Hearing is required on this matter and the Planning Commission should give those comments consideration.

  • V.PLANNING COMMISSION REVIEW FOR RECOMMENDATION As part of the Annexation Request, the City of Dover zoning district is to be determined; therefore, it is a request for a type of zoning map amendment which changes the zoning district of a property. The Planning Commission as part of their public hearing and review process will provide a recommendation on the zoning to City Council. As part of the process outlined in Zoning Ordinance, Article 10 Section 5, the Planning Commission must evaluate the following factors when considering the request:

Article 10 § 5.36 Report of the planning commission. Regarding each application for a zoning map amendment, the planning commission shall provide a report to the city council stating a recommended action with regards to the proposed amendment, along with the commission's evaluation of the following factors:

(A) Whether the uses permitted by the proposed change would be compatible with the existing uses and zones in the area concerned;

(B) Whether adequate public services and infrastructure exist or can be created or expanded to serve the needs of any additional demand as a result of such change; and

(C) Whether the proposed change is in accordance with the city's current comprehensive plan.

A Recommendation Report from the Planning Commission will be forwarded to City Council for their consideration of the Annexation/Rezoning Application.

ADVISORY COMMENTS TO THE APPLICANT

  • 1)The Planning Staff advises the applicant that this general location in the vicinity of the existing partial interchange of State Route 1 and Route 8 (North Little Creek Road) has been mentioned in several studies for potential expansion of the interchange/road network to allow additional access to State Route 1 and related improvements to freight movement conditions in this eastern part of the City. These potential transportation improvements were identified in the East/West Freight Routes Phase 2 Study (2025), the Dover Air Cargo Freight Access Study (2021), and the Dover Freight Plan (2025). See the comments provided by the

60

Paj 61

Item 3. AX-26-02 Lands of United Worldwide Express LLC at 1624 North Little Creek Road DAC Report of February 4, 2026

Dover/Kent County MPO for information and references to these studies.

  • 2)From the agency comments received, it appears that ability to provide City water is feasible due to the proximity to existing infrastructure. The ability for sanitary sewer service would need to be discussed with the Kent County Department of Public Works. It would be the property owner’s responsibility to cover all costs associated with extending and connecting services to the existing building.
  • 3)Regarding connection to City services (water) the applicant must contact the City’s Department of Water & Wastewater for procedures, permitting and impact fees. Regarding connection to Kent County services (sanitary sewer), the applicant must contact the County Department of Public Works for procedures, permitting, and impact fees.
  • 4)Upon annexation into the City of Dover, the property will be subject to the provisions of the Dover Code of Ordinances. This includes procedures such as review processes for plans and permits for construction activities, licensing, etc.
  • 5)The applicant shall be aware that approval of any Annexation & Rezoning application does not represent a Building Permit or other construction activity permit approval. A separate application submission showing all improvements is required before issuance of permits by the City of Dover.
  • 6)The use of the existing building on the property would be subject to the City of Dover procedures for business licensing, public occupancy permits, and/or Vacant Building registration.

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Office as soon as possible.

61

Paj 62

CITY OF DOVER

Item 3.

DEVELOPMENT ADVISORY COMMITTEE APPLICATION REVIEW COMMENTARY STAFF D.A.C. MEETING DATE: JANUARY 28, 2026

APPLICATION: Lands of United Worldwide Express, LLC at 1624 North Little Creek Road and Adjacent Two Parcels FILE #: AX-26-02 REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater CONTACT PHONE #: 302-736-7025 CONTACT EMAIL: jlyon@dover.de.us

T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .

T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT : CITY AND STATE CODE REQUIREMENTS SANITATION / STREETS / STORMWATER / WATER / WASTEWATER / GENERAL 1. Our office has no objections to the proposed annexation of tax parcels ED-00-068.20-01-15.00-000, ED-00-077.00-01-07.00-000 & ED-00-077.00-01-07.01-000. Any redevelopment shall adhere to the City of Dover Water/Wastewater Handbook and the Specifications, Standards & Procedures for Public Works Construction. Impact fees will be applied to this property.

RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES SANITATION / STREETS / STORMWATER / WATER / WASTEWATER / GENERAL 1. None

ADVISORY COMMENTS TO THE APPLICANT

SANITATION / STREETS / STORMWATER / GENERAL

  • 1.None WATER / WASTEWATER
  • 1.As per the Petition to Annex and Rezone Property, as heard by the Council Committee of the Whole, please find the following:
  • a.1624 N. Little Creek Road is not currently served by City of Dover Water. Unaddressed Parcel of 3.15 acres on N. Little Creek Road is not currently served by City of Dover Water. Unaddressed Parcel of 0.48 acres west of State Route 1 is not currently served by City of Dover Water. 1624 N. Little Creek Road is not currently served by City of Dover Sanitary Sewer. Unaddressed Parcel of 3.15 acres on N. Little Creek Road is not currently served by City of Dover Sanitary Sewer. Unaddressed Parcel of 0.48 acres west of State Route 1 is not currently served by City of Dover Sanitary Sewer. The property owner has not contacted the Department about the possible connection to these services. Water is available to these properties. The property owner is responsible for any and all costs associated with extending and providing service upgrades to the property area. Sanitary Sewer is not immediately available to this property area; the developer may reach out to Kent County Public Works to see if the connection is more feasible. The property owner is responsible for any and all costs associated with extending and providing service upgrades to this property area. This may include tapping the sanitary sewer and water mains, connection to the building for both utilities, purchasing appropriately sized water meter and pit, paying impact fees, and obtaining permits. I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE . 62

Paj 63

C F
AX-26-02
Item 3.
I I
T R
CITY OF DOVER Y E

DEVELOPMENT ADVISORY COMMITTEE O M

F A APPLICATION REVIEW COMMENTARY R D.A.C. MEETING DATE: 01/28/26 D S O H V A E L R APPLICATION: Lands of United Worldwide Express at 1624 N Little Creek Rd

FILE #: AX-26-02 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal

CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457 josika@dover.de.us

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.

THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE APPLICANT:

CITY AND STATE CODE REQUIREMENTS:

  • 1.Proposal is a annexation and rezoning request for three parcels. This office has no objections.
  • 2.Every house, building or structure used or intended for use as living quarters or as a place for conducting business, and having any wall facing or abutting any public or private street or alley, shall have displayed on that wall, in legible, easily read characters which are of contrasting color to the background, the proper street number for such house, building, or structure in accordance with the following:

One-family and two-family residential structures, height, the number shall measure a minimum of four inches in height, location, the number shall be placed on the house above or to the left or right of the front entrance, color, the number shall be contrasting to the background color, Arabic numerals, all numbers shall be Arabic numerals.

Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when identifying individual apartments with exterior doors, and 12 inches when identifying buildings with apartment complexes where there are two or more buildings not assigned street addresses. Individual buildings with street addresses shall have numbers measuring six inches, location, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot, color, numbers shall be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic numerals.

63

Paj 64

Item 3.

Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in height, location generally, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot,

property line or driveway, should the building be located far enough from a public or private road so that the numbers are not clearly visible from the street, then the street address shall also be posted on the property at or near the property line or driveway to said building,

color; each building, numbers shall be contrasting to the background color and shall be placed on each building in the complex,

Arabic numerals, all numbers used shall be Arabic numerals,

Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number affixed to the front of the tenant space and on the outside of the rear door which corresponds with that tenant space. Numbers shall measure six inches in height. (City of Dover Code of Ordinances, 98-344)

ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:

  • 1.If the building on the property is being used, an annual fire and life safety inspection is needed. If the building on the property is not being used, it would need to be registered as a vacant building,
  • 2.Please contact this office in reference to fire department responses to the property for open burning, there is no open burning in the City of Dover.

APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):

2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association) 2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association) 2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association) 2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association) 2009 IBC (International Building Code) Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations 2021 Delaware State Fire Prevention Regulations City of Dover Code of Ordinances

*If you have any questions or need to discuss any of the above comments, please call the above contact person listed.

64

Paj 65

Item 3.

From: Mobley, Will (DelDOT)
To: Melson-Williams, Dawn; Schwartz, Joshua (DelDOT)
Subject: EXTERNAL: DAC Comments 28 Jan 26 Staff Development Meeting
Date: Wednesday, January 28, 2026 5:04:46 PM

WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning,

Here are the comments from DelDOT for the applications discussed in the DAC Committee Meeting.

AX-26-01 Lands of Fuller at 7 Nixon Ln
No objection to annexation.

AX-26-02 Lands of United Worldwide Express, LLC at 1624 North Little Creek Rd and Adjacent Two Parcels No objection to annexation.

Z-26-01 Lands of United Worldwide Express, LLC at 1600 North Little Creek Rd and Adjacent Parcel at 0.509 AC North Little Creek Road No objection to rezoning.

C-26-01 Bay Pointe Apartments (One Building Concept) at 1100 Bay Road This project has an Entrance Plan Approval dated 5-10-23. Plan approval expires 5-10- 26. Plans will need reapproval if no work is started before expiration date.

US-26-01 Dover Industrial Park Comprehensive Signage Plan Ensure planned sign structure is outside of DelDOT Right of Way. At a minimum the sign must be placed outside the clear zone of the state maintained frontage road and must not fall within the sight distance triangle located at the site entrance. Lastly Delaware Code 17 § 1108 Location and condition of advertising regulated. ---(a) Subject to subsection (c) of this section, no outdoor advertising sign, display or device, except a directional, gateway, or warning sign, official sign or notice erected by or with the approval of the Department, shall be erected subsequent to July 14, 1969, within 25 feet of the right-of-way line of any public highway if visible from any portion of the same.

65

Paj 66

Item 3.

Sincerely,
Will T Mobley III, PMP
Division of Economic Development, DELDOT
Interim Kent County Review Coordinator
Phone (302)-760-2409
Will.mobley@delaware.gov

66

Paj 67

KENT CONSERVATION DISTRICT

Item 3.

1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG

CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
FEBRUARY 2026

APPLICATION: Lands of United Worldwide Express, LLC at North Little Creek Road and Adjacent Two Parcels FILE #: AX-26-02 REVIEWING AGENCY: Kent Conservation District CONTACT: Cullen Baker PHONE: 302-608-5370 EMAIL: stormwater@kentcd.org

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:

Source: 2019 Delaware Sediment and Stormwater Regulations

CITY AND STATE CODE REQUIREMENTS:

Kent Conservation District has no objection to the annexation & rezoning request for the above referenced parcel.

ADVISORY COMMENTS TO THE APPLICANT:

In the future, if there is any proposed disturbance that will exceed 5,000 square feet, a sediment and stormwater management plan must be reviewed and approved by our office prior to any land disturbing activity (i.e. clearing, grubbing, filling, grading, etc.).

67

Paj 68

Item 3.

CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
ADVISORY BRIEF Planning
D.A.C. MEETING DATE: 2/4/2026 Organization

AX-26-02 Lands of United Worldwide Express, LLC at 1624 North Little Creek Rd and Adjacent Two Parcels

FILE # AX-26-02 REVIEWING AGENCY: Dover/Kent County MPO

CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030

Attached, please find comments submitted by Dover Kent MPO for each of the current City of Dover Development Advisory Committee (DAC) applications. These comments are a part of the MPO’s ongoing goals of promoting transportation safety and connectivity within the region. They are submitted in accordance with the support given by the MPO Council on November 6, 2024.

Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be waived.

City of Dover Planning Commission
Annexation Review

AX-26-02 Lands of United Worldwide Express, LLC at 1624 North Little Creek Rd and Adjacent Two Parcels

Although Dover Kent MPO does not have any objections to the proposed Annexation, it is worth noting that several recent MPO studies pertain to these parcels. First, in the East/West Freight Routes Phase 2 Study, several new alignments were proposed in key locations across Kent County to improve freight conditions and facilitate the movement of goods. The most relevant proposal from the study is the SR 1 interchange, which would allow for direct access to SR 1 from North Little Creek Road.1 If completed, this project would benefit the industrial sites in the area and reduce the amount of truck traffic on surrounding roadways. The project is also a potential benefit to Dover Air Force Base, and several interchange options were evaluated in the

1 East/West Freight Routes Phase 2 Study. Dover/Kent County MPO (2025). https://doverkentmpo.delaware.gov/files/2025/07/East-West-Final-Report-with-Appendicies.pdf#page=16.

68

Paj 69

Item 3.

Dover Air Cargo Freight Access Study.2 However, the interchange project would significantly impact the properties being discussed through this application, as the proposed alignment would run directly through the parcels. With this in mind, the City of Dover and the applicant should review the recommendations of the East/West Freight Routes Phase 2 Study and discuss how the parcels can be utilized while still meeting the greater needs of the freight community in Kent County.

The second relevant study is the Dover Freight Plan, a document that outlines the City’s freight goals and recommends a path forward to achieving them. Some of the steps listed in the document include requiring truck parking and staging areas for all freight-related site development, creating opportunities for freight-intensive development along truck routes, and increasing coordination between local and State agencies and other relevant stakeholders.3 The applicant should be aware of the City’s freight goals and ensure the plans for these properties help work towards the goals’ completion.

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.

2 Dover Air Cargo Freight Access Study - Planning and Environmental Linkage (PEL) Report. Dover/Kent County MPO (2021). https://doverkentmpo.delaware.gov/files/2021/09/Dover-Air-Cargo-Freight-Study- PEL_final.pdf#page=25. 3 Dover Freight Plan. City of Dover (2025). https://doverkentmpo.delaware.gov/files/2025/04/2025-04_Dover- Freight-Plan_FINAL.pdf.

69

Paj 70

Item 3.

70

Paj 71

1

OU T E #
LEXINGTON GLEN H.O.A.
NIC HO
5-05-068.20-01-56.00-000
LAS DR

(OFF RA ZONED R-8 IVE N.O.F.

MP)
NORT
H LIT
STATE OF DELWARE TLE CR

STATE R
EEK RO
AD
STATE ROUTE 1
X LAN
E

FAIRFA

NORT STA

TE ROUTE AY H LITTL / EXPRESSW

STATE
(FREEWAY
(DELA E CRE
W A RE EK RO #1

AD

E #1
ROUT

T H BO
(80' W
IDE
E #8)

R OU T )

(NOR
22'± 702'± TO NICHOLAS
(SO
DRIVE

E #1
C8 C1 318'± TO FAIRFAX
LANE

ROUTD) STATEUTHBOUND) C2 UN

NE C3 ESS, LLC X LA (60' W IDE 01-62.00-000 FAIRF W IDE EXPR A 0.52± AC. L15 CURRENT ZONING: CP 2-05-068.20- L16

UNITED W OR PROPOSED O UNITED W O ZONING: IP LD RLW IDE EX M PRESS, LL LOCATION MAP SCALE: 1"=1000' 2-05-068.20- C 01-61.00-000 (FREEW L14 L18

1
L17 KEY INDEX

OUTE #AY) 477.8'±

1.77 ± AC.

STATE R
(W IDTH
AY ANNEXATION
SEPTIC
C UR RE N T
ZONING: C
VARIES

S SW PROPOSED PO

/ E XPRE C4 WETLANDS

ZONING: IP L19 )

M
C7

L221
L2
L2L20113'±50.9'±
3

LINE BEARING DISTANCE N.O.F. L1 S 86°43'12" W 20.00' STATE OF DELWARE L2 S 00°49'32" E 71.97' STATE ROUTE 1 L3 S 00°49'32" E 82.66' UNITED WORLWIDE EXPRESS, LLC L4 S 88°07'03" W 115.00' L5 S 02°34'03" E 404.14' L13 2-00-068.20-01-15.00-000 L1 L6 S 87°45'58" E 125.01' 5.12± AC. CURRENT ZONING: IL L7 N 50°03'24" W 302.67' 98'± L8 N 85°02'34" W 241.97' PROPOSED ZONING: IPM L2 L9 N 50°03'24" W 31.95' L10 N 19°38'41" W 502.78' IL ZONE L12 ZONING DISTRICT BOU NDARY LINE L11 S 31°50'26" W 33.84' RMH ZONE L12 S 85°49'01" W 392.38' L1 L3 L13 N 19°38'41" W 308.86' 1 L14 N 08°45'20" E 343.64' L4 L15 N 05°37'04" E 236.18' UNITED WORLWIDE EXPRESS, LLC L16 N 05°37'26" E 236.42' 2-00-077.00-01-07.00-000 L17 S 82°22'34" E 65.00' 3.15± AC. L18 S 82°22'56" E 30.20' CURRENT ZONING: RMH L19 N 05°37'26" E 245.00' Y PROPOSED ZONING: IPM

ER WA

L20N 88°55'26" E144.00'
L21N 36°19'34" W79.07'
RUBAK IDE
L22N 27°55'12" E51.19'
L23N 31°59'09" E43.40'
(60' W

N.O.F. L10 L5 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING A SUBDIVISION KNOWN AS C1 2894.90' 124.90' 124.89' S 80°20'42" E "ROJAN MEADOWS" C2 2894.90' 95.25' 95.25' S 82°31'25" E AS RECORDED IN PLAT C3 2894.90' 102.82' 102.82' S 84°29'01" E BOOK 153, PAGE 34 C4 5884.23' 648.59' 648.26' N 07°02'05" W ZONED RM-1/PND, C5 21539.48' 77.09' 77.09' S 02°52'48" W AEOZ-APZII C6 21539.48' 173.65' 173.65' N 02°58'30" E C7 361.01' 94.46' 94.19' N 16°21'32" E C8 25.00' 14.26' 14.07' S 25°05'47" W

L6

L9 UNITED WORLDWIDE EXPRESS
C5
L8 2-00-077.00-01-07.01-000
0.48± AC.
CURRENT ZONING: RMH
PROPOSED ZONING: IPM

L7
C6

AD
RO
A N IDE
J 'W
RO (60

NOTES CURRENT OWNER OF RECORD: UNITED WORLDWIDE EXPRESS. LLC 605 INTERCHANGE BOULEVARD ANNEXATION PLAN NEWARK, DE 19711 OF ENGINEER: SCOTT ENGINEERING, INC. UNITED WORLDWIDE EXPRESS, LLC 22 OLD RUDNICK LANE DOVER, DE 19901 NORTH LITTLE CREEK ROAD 1. TAX MAP PARCEL NO. 2-00-068.20-01-15.00-000 ZONED IL (5.12± AC.) DOVER, DE 2-00-077.00-01-07.00-000 ZONED RMH (3.15± AC.) 2-00-077.00-01-07.01-000 ZONED RMH (0.48± AC.)

  • 2.PROPOSED ZONING: IPM (INDUSTRIAL PARK MANUFACTURING) SITUATE IN: EAST DOVER HUNDRED
  • 3.EXISTING USE: STORAGE AND WAREHOUSE KENT COUNTY, STATE OF DELAWARE
  • 4.PROPOSED USE: MINI STORAGE
  • 5.SETBACKS: EXISTING IL - FRONT 40'; SIDE 25'; REAR 40' SCOTt ENGINEERING, INC. RMH - FRONT 20'; SIDE 5'; REAR 10' Consulting Engineers Surveyors Land Planners PROPOSED IPM - FRONT 60', SIDE & REAR 40' (100' ADJOINING RESIDENTIAL ZONE) 22 Old Rudnick Lane, Suite 2 Dover, DE 19901 302-736-3058 DRAWING NO. 3220 SCALE: 1"=150'

DRAWN BY. S.E.I. ANNEX-1

Paj 72

Item 4.

City of Dover PETITION TO AMEND ZONING DISTRICT First Reading before the Dover City Council on January 28, 2026 Development Advisory Committee Review – Applicant DAC Meeting of February 4, 2026 Public Hearing Before the Planning Commission on February 17, 2026

Application: Lands of United Worldwide Express, LLC at 1600 North Little Creek Road and Adjacent Parcel at 0.509 AC North Little Creek Road Rezoning C-PO/AEOZ to IPM/AEOZ

Owner: United Worldwide Express, LLC

Address: 1600 North Little Creek Road, Dover DE and
Unaddressed parcel referenced as 0.509 AC North Little Creek Road,
Dover DE

Location: Located on the south side of North Little Creek Road between Fairfax Lane and State Route 1

Tax Parcel: ED-05-068.20-01-61.00-000 and ED-05-068.20-01-62.00-000

Size: 1.77 acres +/- and 0.52 acres +/-

Present Use: Vacant Land (previous building demolished)

2019 Comprehensive Plan – Land Use Category: Office and Office Park

Present Zoning: C-PO (Commercial and Professional Office Zone) and subject to the AEOZ (Airport Environs Overlay Zone): APZ II - Accident Potential Zone II

Proposed Zoning: IPM (Industrial Park Manufacturing Zone) and subject to the AEOZ (Airport Environs Overlay Zone): APZ II - Accident Potential Zone II

Reason for Request: Rezoning the property for development of mini-storage buildings

File Number: Z-26-01

Ordinance Number: 2026-07

Note: This Review Report was initially prepared by Staff of the Rossi Group (under a Planning Services contract with the City of Dover). The DRAFT Report was completed with additional review and editing by the City’s Planning Office.

  • I.APPLICATION SUMMARY: This Rezoning Application is for two parcels of land located at 1600 North Little Creek Road
  • P.O. Box 475 Dover, DE 19903 72 Community Excellence Through Quality Service

Paj 73

Item 4. Z-26-01 Lands of United Worldwide Express, LLC. at 1600 North Little Creek Road DAC Report of February 4, 2026

consisting of 1.77 acres +/- and the adjacent parcel to the east consisting of 0.52 acres +/-. The properties are zoned C-PO (Commercial and Professional Office Zone) and subject to the AEOZ (Airport Environs Overlay Zone): APZ II - Accident Potential Zone II. The proposed Zoning for both properties is IPM (Industrial Park Manufacturing Zone) and subject to the AEOZ (Airport Environs Overlay Zone): APZ II - Accident Potential Zone II. The properties are located on the south side of North Little Creek Road between Fairfax Lane and State Route 1. The owner of both parcels is United Worldwide Express, LLC. Property Addresses: 1600 North Little Creek Rd and one unaddressed parcel referenced as 0.509 AC North Little Creek Road. Tax Parcels: ED-05-068.20-01-61.00-000 and ED-05-068.20-01-62.00-000. Council District 2. Ordinance #2026-07.

The First Reading of this Proposed Ordinance was scheduled for January 26, 2026 and was completed at the City Council Meeting of January 28, 2026 due to the meeting being postponed due to weather. Public Hearing before the Planning Commission is scheduled for February 17, 2026 and the Public Hearing before the City Council is set for March 9, 2026.

Existing Property: The existing property included a building onsite that was to be demolished under Demolition Permit #24-1615. The properties are located on the south side of North Little Creek Road between Fairfax Lane and State Route 1. The applicant is seeking rezoning to allow for future development of the properties to be mini storage buildings. Any redevelopment of the site will be subject to a separate application submission for plans or permits.

Surrounding Land Uses Parcels adjacent to the subject properties are zoned RM-1 (Medium Density Residential) along the west border. The RM-1 zoned property is associated with a subdivision known as “Rojan Meadows PND” which includes single-family residences. Land to the north is dedicated to transportation right-of-way with State Route 1 and North Little Creek Road. Adjacent to the east and south is a series of properties subject to Annexation Application AX-26-02 Lands of United Worldwide Express, LLC at 1624 North Little Creek Road and Two Parcels.

II. COMPREHENSIVE PLAN COMPLIANCE REVIEW

In the 2019 Comprehensive Plan, the Land Development Plan (Map 12-1) recommends that this property be used for Office use. Additionally, the subject parcels are located within the zoning district AEOZ (Airport Environs Overlay Zone). The 2019 Comprehensive Plan describes strategies and recommendations for Employment Centers, which includes office and industrial uses. It also includes strategies and recommendations related to the Dover Air Force Base. The associated goals and policies are listed in the 2019 Comprehensive Plan excerpts presented below (pages 12-16 through 12-20); see excerpt below:

EMPLOYMENT CENTERS: OFFICE PARK AND INDUSTRIAL

LAND USES

To a large extent, Dover’s character has been set by the historic location of key uses throughout the City, from the governmental complexes in the center, to rail dominate uses along the railroad right-of-way, to military uses at Dover Aire Force Base (DAFB). Today, office parks and industrial land uses are areas partially or completely occupied by existing industrial and/or manufacturing uses. A large area 73

Paj 74

Item 4. Z-26-01 Lands of United Worldwide Express, LLC. at 1600 North Little Creek Road DAC Report of February 4, 2026

of vacant developable land north of and adjoining Dover Air Force Base has been designated for industrial and manufacturing uses. Such uses are generally more compatible with military operations and seem to be less effected by noise associated with military overflights. Other areas for employment centers are adjacent to transportation routes (vehicle and rail). See Chapter 10 – Economic Development) for a more detailed discussion of Dover’s economic opportunities.

Assumptions: Employment Centers 1. The Dover community is fortunate to harbor several regional, national and international industry leaders within the City limits. Dover intends to accommodate the reasonable aspirations and expectations of its industrial and manufacturing community to support the vitality of these precious resources.

  • 2.A healthy and well-rounded local economy will depend upon diversity in business and employment opportunities.
  • 3.Opportunities exist to build on Dover’s regional proximity for warehousing and distribution and its access to Dover Air Force Base (DAFB) for expansion of civilian air transportation and aviation related manufacturing, service and repair functions.

Goal: Employment Centers Create a more vibrant, growing economy with a broader range of job opportunities through collaborative efforts to market the region, identify potential targets, and respond to opportunities to foster an increase in office and industrial development in appropriate and designated areas.

Policies: Employment Centers 1. Protect existing industrial, office park and manufacturing establishments from encroachment by incompatible land uses which could result in nuisance complaints, hazardous situations, and human conflict.

  • 2.Provide sufficient land area for industrial purposes to enable the expansion of existing industries, the establishments of new facilities, and revitalization of underutilized older industrial sites.
  • 3.Provide for a variety of office park and industrial development opportunities through the designation of areas for small, medium and large establishments within planned industrial parks.
  • 4.Promote alternative modes of accessibility including pedestrian and bicycle facilities, bus shelters and transit stops, and provide incentives for car and van pooling of employees.

74

Paj 75

Item 4. Z-26-01 Lands of United Worldwide Express, LLC. at 1600 North Little Creek Road DAC Report of February 4, 2026

  • 5.Create flexible and contemporary industrial zoning provisions that reflect emerging trends in uses, facilities, and business opportunities to meet future needs.

Recommendations: Employment Centers The City is committed to fostering a strong, vibrant, and balanced local economy built on existing and new business locations. This initiative requires close coordination with state and county economic development entities. It also requires continuous attention to the needs of existing businesses, efforts to promote a skilled workforce, a comprehensive marketing and promotional strategy, and land use and development regulations that are efficient and contemporary. The Comprehensive Plan designates areas throughout the City where job growth and opportunities are encouraged. Plan Chapter 10 – Economic Development lays out a set of goals and actions designed to reinforce this commitment.

Office Parks The Land Development Plan designates specific tracts of land of various sizes for Office and Office Park land uses. Office Park development involves an integrated development of office buildings with shared entrances, driveways and parking. The majority of uses permitted within an Office Park are generally weekday professional office uses involving very little or no activity at night or on weekends. For this reason, the Office Park designation may be viewed as a transitional use category when situated between more intense commercial and industrial land uses and residential land uses. This designation usually involves the C-PO (Commercial/Professional Office Zone) zoning district. These areas are located throughout the City with established office concentrations in the Enterprise Business Park, along Silver Lake Boulevard, on College Park Drive, along Old Rudnick Lane, the Northgate Center, and elsewhere. Scattered office uses are also located along Saulsbury/McKee Road and within designated “Mixed Use” areas in the Eden Hill Farm Traditional Neighborhood Design (TND). Smaller scale areas for office parks are the Woodbrook complex on South Governors Avenue, office complexes along Walker Road, and areas along Route 8.

Large Scale Industry The Land Development Plan designates all existing major industrial facilities and associated vacant lands for Industrial use. These properties include the manufacturing facilities of Kraft Heinz Foods, Proctor & Gamble, Edgewell Personal Products, PPG Industries, General Metalcraft and others.

Industrial Parks Several planned industrial parks have been initiated since 1986 which offer industrial development potential. The Land Development Plan designates these sites for continued Industrial use. These sites include Kent County Aero Park/Air Cargo Terminal, Enterprise Business Park, College Business Park, and McKee Business Park. The City purchased and has developed the Garrison Oak Business and Technology Center (formerly the Garrison Oak Technical Park) in 1999-2000. It now houses a solar electric facility, an electric generating facility, a flooring

75

Paj 76

Item 4. Z-26-01 Lands of United Worldwide Express, LLC. at 1600 North Little Creek Road DAC Report of February 4, 2026

products manufacturer, and a security firm with ten shovel ready lots remaining available. Planning is underway to extend the Joint Use Agreement with Dover Air Force Base to allow expansion of the Kent County Aero Park into a regional facility. The Central Delaware Aviation Complex will facilitate aviation uses including air cargo, aircraft maintenance and repair, and related uses as part of a newly designated “Employment Center.”

DOVER AIR FORCE BASE

Although Dover Air Force Base (DAFB) is within the City limits, as a land holding of the Federal government it is not subject to municipal regulation. In recognition of the strategic importance of DAFB with respect to the national interest, as well as the contributions of DAFB to the local economy and overall image of Dover, it is essential that the Comprehensive Plan support and protect the vital interests of Dover Air Force Base as an integral part of Dover. A majority of the land area surrounding DAFB is within the City limits. Much of this land is impacted by noise associated with base operations and specific locations in close proximity to aircraft runways have been identified by the Department of Defense as accident potential zones. It is within these areas that Dover can play an important role in protecting the mission of DAFB by restricting development within these areas to uses that would be relatively compatible with military operations. The Airport Environs Overlay Zone (AEOZ) was adopted in 2001 and revised in 2013 following the Air Installation Compatible Use Zone Study Update from August 2010. By virtue of a Joint Use Agreement and a dedicated taxiway access to the base runway and air traffic control capabilities, a connection to the Base for civilian aircraft use is available. Operated by the Delaware River and Bay Authority on behalf of DelDOT and adjacent to the Kent County Aeropark, the Civil Air Terminal represents a significant resource for future development of aviation and aeronautic business opportunities.

Assumptions: Dover Air Force Base 1. Dover Air Force Base influences the Dover community in many positive ways. Its benefits include positive economic impacts through employment and commerce. Skilled military personnel and their families from all over the country come to Dover and become an important part of our community. Dover residents also take great pride in the important role Dover Air Force Base plays in the defense of our nation and its peacekeeping and emergency relief efforts.

  • 2.The connection to the Base for expansion of adjacent public and private air-related uses is an important, long-term opportunity for the City and Kent County.

76

Paj 77

Item 4. Z-26-01 Lands of United Worldwide Express, LLC. at 1600 North Little Creek Road DAC Report of February 4, 2026

Goal: Dover Air Force Base Create a favorable and compatible environment for Dover Air Force Base through a resolute commitment to provide all reasonable planning accommodations to protect the Base.

Policies: Dover Air Force Base 1. Restrict land uses surrounding Dover Air Force Base to uses defined in the most current edition of the Air Installation Compatible Use Zone (AICUZ) document produced by the United States Department of Defense.

  • 2.Require special noise attenuation measures to be incorporated within plans for the construction of new buildings in the vicinity of Dover Air Force Base.
  • 3.Maintain the designated Airport Environs Overlay Zone (AEOZ) which includes the Accident Potential Zones and Noise Zones as defined by the Air Installation Compatible Use Zone (AICUZ) document. This ordinance sets forth regulations within the Zoning Ordinance governing land use and development within these areas (Article 3 Section 22). The boundaries of the AEOZ may be updated in the future to coincide with the most current edition of the AICUZ document.
  • 4.Ensure cooperative planning to facilitate joint use activities in a manner that protects the Base operations while achieving associated economic benefits.

Recommendations: Dover Air Force Base The Land Development Plan reflects the existing limits of Dover Air Force Base for location purposes. No enlargement of the land use area associated with DAFB is proposed at this time. Areas immediately north of DAFB within the City limits have been designated for Industrial uses, focused on air cargo and other aviation- based uses. A few small pockets of existing residential development exist north of DAFB along Horsepond Road and Lafferty Lane. The Land Development Plan shows this area as Industrial, primarily because the AEOZ (Airport Environs Overlay Zone) prohibits new residential uses in this area. The City will not rezone active residential properties until or unless the residential use ceases on that property. Portions of the adjacent industrial lands and other lands will be considered for rezoning to a newly established IPM3 (Industrial Park Manufacturing – Industrial Aviation and Aeronautics Center) zone as master planning for the area continues. As part of the Land Development Plan, Table 12-1: Land Use and Zoning Matrix specifies that the following zones are compatible with this land use classification of Office and Office Parks.

CPO (Commercial and Professional Office)
Office and Office Parks IO (Institutional and Office)
IPM (Industrial Park Manufacturing)
RGO (General Residence and Office)

77

Paj 78

Item 4. Z-26-01 Lands of United Worldwide Express, LLC. at 1600 North Little Creek Road DAC Report of February 4, 2026

III. ZONING REVIEW

Request for IPM (Industrial Park Manufacturing Zone) Zoning The following code excerpt of the IPM zoning district is provided from Article 3 §20 of the Zoning Ordinance. Article 3 Section 20. Industrial park manufacturing zone (IPM). 20.1 Uses permitted. No building or premises shall be used and no building or part of a building shall be erected, which is arranged, intended or designed to be used, in whole or in part, for any purpose, except the following, and in accordance with performance standards procedure as set forth in article 5, section 8, and subject to site development plan approval as set forth in article 10, section 2: 20.11 Manufacturing, assembling, converting, altering, finishing, cleaning, cooking, baking or any other type of manufacturing or industrial processing of any goods, materials, products, instruments, appliances and devices, provided that the fuel used shall be oil, gas or electricity; together with incidental clinics, cafeterias and recreational facilities for the exclusive use of employees of the concern engaged in such undertaking. 20.12 Research, design, testing and development laboratories. 20.13 Printing, publishing, binding, packaging, storage, warehousing, transshipment and distribution, and trucking terminals. 20.14 Business, professional or administrative offices; banks and financial institutions; hotels, motels and restaurants; public parks, playgrounds, and recreational facilities; and public utility uses, provided that these uses shall only be located upon a thoroughfare, arterial street or access highway with[in] the IPM zone. Retail sales and service establishments within planned industrial parks for local needs and local consumption of the employees and customers of the other permitted uses within the planned industrial park. 20.15 Signs shall meet the regulations found in article 5, section 4, supplementary sign regulations. 20.16 Agricultural or farm uses as defined and permitted in article 3, section 1.11. 20.17 The following uses may be permitted as conditional uses if approved by the planning commission in accordance with the provisions and procedures set forth in article 10, section 1 and any specified requirements set forth below: (a) Associated retail uses in conjunction with and accessory to a permitted use, provided that the associated retail use does not occupy more than 30 percent of the gross floor area of the building or group of buildings on a lot. Parking shall be provided at a rate of one parking space per 300 square feet of retail space for the exclusive use of retail customers in addition to the bulk parking requirements of this zoning district for a particular use. 20.18 Mini-storage facilities, subject to the following regulations: (a) No unit shall be placed within 30 feet of any other structure on the lot or a residential property line. (b) No outside storage [is allowed], except for recreational vehicles, boats or personal automobiles when completely screened from view and parked in specifically approved locations. Parking for these vehicles shall not count toward the required parking set forth in subsection (e) below. (c) No individual unit may be used for retail, garage sale or any other commercial activities. (d) No storage of flammable, explosive, corrosive or other hazardous products may occur in the individual unit. (e) Parking must be provided at a ratio of one space for each 25 rental units, plus a minimum of three spaces for an office outside of the enclosure. One row of parallel parking is permitted between buildings at a ratio of one space per 25 feet. (f) All other bulk requirements of this ordinance are met.

78

Paj 79

Item 4. Z-26-01 Lands of United Worldwide Express, LLC. at 1600 North Little Creek Road DAC Report of February 4, 2026

20.19 Marijuana cultivation facilities, marijuana manufacturing facilities, and marijuana testing facilities, subject to the requirements outlined in article 5, section 24. 20.2 Uses prohibited. The following uses are specifically prohibited: 20.21 Residences, except those existing at the time of adoption of this amendment. 20.22 Manufacturing uses involving primary production of the following products from raw materials: asphalt, cement, charcoal, and fuel briquettes; chemicals: aniline dyes, ammonia, carbide, caustic soda, cellulose, chlorine, and carbon black and bone black, creosote, hydrogen and oxygen, industrial alcohol, nitrates (manufactured and natural) of an explosive nature, potash, plastic materials, and synthetic resins, pyroxylin, rayon yarn, and hydrochloric, nitric, phosphoric, picric, and sulphuric acids: coal, coke, and tar products, including gas manufacturing; explosives; fertilizers; glue, and size (animal); linoleum and oil cloth; matches; paint, varnishes, and turpentine; rubber (natural or synthetic); [and] soaps, including fat rendering. 20.23 The following processes: nitrating of cotton or other materials; magnesium foundry; reduction, refining, smelting, and alloying of metal or metal ores; refining secondary aluminum; refining petroleum products, such as gasoline, kerosene, naphtha, [and] lubricating oil; distillation of wood or bones; [and] reduction and processing of wood pulp and fiber, including papermill operations. 20.24 Operations involving stockyards, slaughterhouses, and slag piles. 20.25 Storage of explosives, [and] bulk or wholesale storage of gasoline above [the] ground. 20.26 Dumps. 20.27 Quarries, stone crushers, screening plants, and storage of quarry screenings, accessory to such uses. 20.28 Junkyards, automobile dismantling plants or storage of used parts of automobiles or other machines or vehicles or of dismantled or junked automobiles.

AEOZ (Airport Environs Overlay Zone) The property is located within the AEOZ – APZ-II (Accident Potential Zone II) found in Article 3 §22.3 of the Zoning Ordinance. The AEOZ includes prohibition of certain uses that are incompatible with the Dover Air Force Base operations, specifically regarding noise and accident potential; see Zoning Ordinance, Article 3 §22.6.

IV. RECOMMENDATION OF THE PLANNING STAFF:

This Request is to rezone lands from C-PO (Commercial and Professional Office Zone) to IPM (Industrial Park Manufacturing Zone) and to remain within the AEOZ (Airport Environs Overlay Zone). The current C-PO zone allows for business, governmental, medical, and financial uses, as well as a series of accessory uses subject to conditional use review. The C-PO zone does not permit mini-storage facilities. See Zoning Ordinance, Article 3 §26.

The IPM Zone allows many of the uses permitted within the C-PO Zone, but it also allows for other uses, including manufacturing and mini-storage facilities. The AEOZ further restricts uses in the areas surrounding the Dover Air Force Base to protect public health, safety, and welfare by identifying areas impacted by high levels of aircraft noise and the potential for aircraft accidents associated with airport operations.

As part of the process to change the zoning district of a property outlined in Zoning Ordinance, Article 10 Section 5, the City Planner must evaluate the following factors when considering the request:

79

Paj 80

Item 4. Z-26-01 Lands of United Worldwide Express, LLC. at 1600 North Little Creek Road DAC Report of February 4, 2026

Article 10 § 5.22 City planner report. For each proposed zoning text amendment, the city planner shall issue a report to the planning commission and city council, including comments from other reviewing agencies, that evaluates the following factors:

(A) Whether such change is consistent with the aims and principles embodied in the ordinance as to the particular zones concerned; and

(B) Whether such proposed amendment is consistent with the aims of the comprehensive plan of the city.

Staff recommends that the Rezoning of the two properties (parcels 61.00 and 62.00) be granted to IPM (Industrial Park Manufacturing Zone). The proposed zoning is consistent with the Comprehensive Plan for the Office Land Use Category classification. Rezoning to IPM is one of the zoning districts eligible for consideration in this Land Use Category classification. The IPM zone permits the mini-storage facility use desired by the applicant.

Staff also recommends that the properties remain subject to the AEOZ (Airport Environs Overlay Zone). The purpose of the AEOZ is to ensure uses within this area are compatible with operations of the Air Force Base.

The Rezoning Request, including the retention of the AEOZ, is consistent with policies set forth in the 2019 Comprehensive Plan related to Employment Centers and the Dover Air Force Base.

This Rezoning Request does not grant approval of a specific use for the property but makes its land use subject to a listing of uses permitted and potential conditional uses as allowed in IPM (Industrial Park Manufacturing Zone) zoning district and the Land Use Compatibility Table of the AEOZ found in Zoning Ordinance, Article 3 Section 22.6. If the application for Rezoning is recommended by the Planning Commission and subsequently approved by the City Council, the applicant will still have to submit plans and/or permits for review for certain uses or redevelopment of the site.

This recommendation is being made without the benefit of hearing the comments of surrounding landowners and residents. A public hearing is required on this matter and the Planning Commission should give those comments consideration.

  • V.PLANNING COMMISSION REVIEW FOR RECOMMENDATION This Rezoning Application is a request for a zoning map amendment which changes the zoning district of a property(s). The Planning Commission as part of their public hearing and review process will provide a recommendation on the Rezoning Request to City Council. As part of the process outlined in Zoning Ordinance, Article 10 Section 5, the Planning Commission must evaluate the following factors when considering the request:

Article 10 § 5.36 Report of the planning commission. Regarding each application for a zoning map amendment, the planning commission shall provide a report to the city council stating a recommended action with regards to the proposed amendment, along with the commission's evaluation of the following factors:

(A) Whether the uses permitted by the proposed change would be compatible with the existing uses and zones in the area concerned;

80

Paj 81

Item 4. Z-26-01 Lands of United Worldwide Express, LLC. at 1600 North Little Creek Road DAC Report of February 4, 2026

(B) Whether adequate public services and infrastructure exist or can be created or expanded to serve the needs of any additional demand as a result of such change; and

(C) Whether the proposed change is in accordance with the city's current comprehensive plan.

A Recommendation Report from the Planning Commission will be forwarded to City Council for their consideration of the Rezoning Application.

VI. ADVISORY COMMENTS TO THE APPLICANT:

  • 1)The Planning Staff advises the applicant that this general location in the vicinity of the existing partial interchange of State Route 1 and Route 8 (North Little Creek Road) has been mentioned in several studies for potential expansion of the interchange/road network to allow additional access to State Route 1 and related improvements to freight movement conditions in this eastern part of the City. These potential transportation improvements were identified in the East/West Freight Routes Phase 2 Study (2025), the Dover Air Cargo Freight Access Study (2021), and the Dover Freight Plan (2025). See the comments provided by the Dover/Kent County MPO for information and references to these studies.
  • 2)The applicant shall be aware that approval of any Rezoning application does not represent Site Development Plan or Subdivision Plan. Following any decision made by City Council regarding this Rezoning, an application for a Site Plan, Subdivision Plan, and/or appropriate Building Permits must be submitted to the Planning Department prior to the establishment of a new use, redevelopment activity, or any construction activity on the site. The applicant should contact the Planning Staff to determine the appropriate review process for any proposed projects.
  • 3)The properties are subject to the requirements of the AEOZ (Airport Environs Overlay Zone) related to development. Future plan submission must reflect this zoning classification on the plan sheets.
  • 4)The applicant shall be aware that approval of any Rezoning application does not represent a Building Permit, Demolition Permit, Sign Permit, or other construction activity permit approval. A separate application submission is required before issuance of permits by the City of Dover.
  • 5)The applicant shall be aware that any future use and/or buildings may be subject to separate permitting or licensing processes through the City of Dover Licensing and Permitting Division. All businesses operating in the City of Dover are required to obtain a City of Dover Business License. Certain types of uses also require a Public Occupancy Permit or Rental Dwelling Permits.

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Office as soon as possible.

81

Paj 82

Item 4.

CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JANUARY 28, 2026

APPLICATION: Lands of United Worldwide Express, LLC at 1600 North Little Creek Road and Adjacent Parcel at 0.509 AC North Little Creek Road FILE #: Z-26-01 REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services CONTACT PHONE #: 302-736-7025 CONTACT EMAIL #: jlyon@dover.de.us

T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .

T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :

CITY AND STATE CODE REQUIREMENTS

SANITATION / STREETS / STORMWATER / WATER / WASTEWATER / GENERAL

  • 1.Our office has no objections to the proposed rezoning of tax parcels ED-05-068.20-01-61.00-000 and ED-05-068.20-01-62.00-
  • 000.Any redevelopment shall adhere to the City of Dover Water/Wastewater Handbook and the Specifications, Standards & Procedures for Public Works Construction. Impact fees may be applied to this property. Future development shall comply with all aspects of the City of Dover’s Cross Connection Control Program.

RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES SANITATION / STREETS / STORMWATER / WATER / WASTEWATER / GENERAL 1. None

ADVISORY COMMENTS TO THE APPLICANT

SANITATION / STREETS / STORMWATER / WATER / WASTEWATER / GENERAL 1. None I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .

82

Paj 83

Item 4.

CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JAN 28, 2026

APPLICATION: Lands of United Worldwide Express, LLC at 1600 North Little Creek Rd and adjacent Parcel at .509 AC North Little Creek Road FILE #: Z-26-01 REVIEWING AGENCY: City of Dover Electric Department CONTACT PERSON: Shawn Burgett, Engineering Services & System Ops Superintendent CONTACT PHONE #: 302-674-7568 CONTACT EMAIL #: sburgett@dover.de.us

T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .

T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :

CITY AND STATE CODE REQUIREMENTS

ELECTRIC

Our office has no objection to the rezoning of: ED-05-068.20-01-61.00-000 and ED-05-068.20-01-62.00-000.

RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES ELECTRIC 1. Should this site be redeveloped, which includes modifications to the use, the applicant / developer will be responsible for all costs associated with providing the appropriate meter / service to this site based upon the use including any necessary system upgrades or extensions. The appropriateness and adequacy of electric and meters will be assessed at that time. 2. Any redevelopment shall adhere to the City of Dover’s Electric Service Handbook. https://evogov.s3.amazonaws.com/media/27/media/13108.pdf.

ADVISORY COMMENTS TO THE APPLICANT

ELECTRIC

  • 1.None.

I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .

83

Paj 84

C F
Z-26-01
Item 4.
I I
T R
CITY OF DOVER Y E

DEVELOPMENT ADVISORY COMMITTEE O M

F A APPLICATION REVIEW COMMENTARY R D.A.C. MEETING DATE: 01/28/26 D S O H V A E L R APPLICATION: Lands of United Worldwide Express at 1600 N Little Creek Rd

FILE #: Z-26-01 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal

CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457 josika@dover.de.us

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.

THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE APPLICANT:

CITY AND STATE CODE REQUIREMENTS:

  • 1.Proposal is a rezoning request for two parcels. This office has no objections.
  • 2.Every house, building or structure used or intended for use as living quarters or as a place for conducting business, and having any wall facing or abutting any public or private street or alley, shall have displayed on that wall, in legible, easily read characters which are of contrasting color to the background, the proper street number for such house, building, or structure in accordance with the following:

One-family and two-family residential structures, height, the number shall measure a minimum of four inches in height, location, the number shall be placed on the house above or to the left or right of the front entrance, color, the number shall be contrasting to the background color, Arabic numerals, all numbers shall be Arabic numerals.

Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when identifying individual apartments with exterior doors, and 12 inches when identifying buildings with apartment complexes where there are two or more buildings not assigned street addresses. Individual buildings with street addresses shall have numbers measuring six inches, location, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot, color, numbers shall be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic numerals.

84

Paj 85

Item 4.

Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in height, location generally, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot,

property line or driveway, should the building be located far enough from a public or private road so that the numbers are not clearly visible from the street, then the street address shall also be posted on the property at or near the property line or driveway to said building,

color; each building, numbers shall be contrasting to the background color and shall be placed on each building in the complex,

Arabic numerals, all numbers used shall be Arabic numerals,

Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number affixed to the front of the tenant space and on the outside of the rear door which corresponds with that tenant space. Numbers shall measure six inches in height. (City of Dover Code of Ordinances, 98-344)

ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:

  • 1.N/A

APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):

2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association) 2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association) 2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association) 2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association) 2009 IBC (International Building Code) Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations 2021 Delaware State Fire Prevention Regulations City of Dover Code of Ordinances

*If you have any questions or need to discuss any of the above comments, please call the above contact person listed.

85

Paj 86

Item 4.

From: Mobley, Will (DelDOT)
To: Melson-Williams, Dawn; Schwartz, Joshua (DelDOT)
Subject: EXTERNAL: DAC Comments 28 Jan 26 Staff Development Meeting
Date: Wednesday, January 28, 2026 5:04:46 PM

WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning,

Here are the comments from DelDOT for the applications discussed in the DAC Committee Meeting.

AX-26-01 Lands of Fuller at 7 Nixon Ln
No objection to annexation.

AX-26-02 Lands of United Worldwide Express, LLC at 1624 North Little Creek Rd and Adjacent Two Parcels No objection to annexation.

Z-26-01 Lands of United Worldwide Express, LLC at 1600 North Little Creek Rd and Adjacent Parcel at 0.509 AC North Little Creek Road No objection to rezoning.

C-26-01 Bay Pointe Apartments (One Building Concept) at 1100 Bay Road This project has an Entrance Plan Approval dated 5-10-23. Plan approval expires 5-10- 26. Plans will need reapproval if no work is started before expiration date.

US-26-01 Dover Industrial Park Comprehensive Signage Plan Ensure planned sign structure is outside of DelDOT Right of Way. At a minimum the sign must be placed outside the clear zone of the state maintained frontage road and must not fall within the sight distance triangle located at the site entrance. Lastly Delaware Code 17 § 1108 Location and condition of advertising regulated. ---(a) Subject to subsection (c) of this section, no outdoor advertising sign, display or device, except a directional, gateway, or warning sign, official sign or notice erected by or with the approval of the Department, shall be erected subsequent to July 14, 1969, within 25 feet of the right-of-way line of any public highway if visible from any portion of the same.

86

Paj 87

Item 4.

Sincerely,
Will T Mobley III, PMP
Division of Economic Development, DELDOT
Interim Kent County Review Coordinator
Phone (302)-760-2409
Will.mobley@delaware.gov

87

Paj 88

KENT CONSERVATION DISTRICT

Item 4.

1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG

CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
FEBRUARY 2026

APPLICATION: Lands of United Worldwide Express, LLC at 1600 North Little Creek Road and Adjacent Parcel at 0.509 AC North Little Creek Road FILE #: Z-26-01 REVIEWING AGENCY: Kent Conservation District CONTACT PERSON: Cullen Baker PHONE: (302) 608 – 5370 EMAIL: stormwater@kentcd.org

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:

Source: 2019 Delaware Sediment and Stormwater Regulations

CITY AND STATE CODE REQUIREMENTS:

Kent Conservation District has no objection to the proposed rezoning of the above referenced site.

ADVISORY COMMENTS TO THE APPLICANT:

Soil disturbance (e.g. clearing, grading, excavations, tree clearing, or stoning) equal to or greater than 5,000 square feet requires a Sediment and Stormwater Management Plan to be submitted and approved by the Kent Conversation District prior to the commencement of disturbance.

88

Paj 89

Item 4.

CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
ADVISORY BRIEF Planning
D.A.C. MEETING DATE: 2/4/2026 Organization

Z-26-01 Lands of United Worldwide Express, LLC at 1600 North Little Creek Rd and Adjacent Parcel at 0.509 AC North Little Creek Road

FILE # Z-26-01 REVIEWING AGENCY: Dover/Kent County MPO

CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030

Attached, please find comments submitted by Dover Kent MPO for each of the current City of Dover Development Advisory Committee (DAC) applications. These comments are a part of the MPO’s ongoing goals of promoting transportation safety and connectivity within the region. They are submitted in accordance with the support given by the MPO Council on November 6, 2024.

Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be waived.

City of Dover Planning Commission
Zoning Review

Z-26-01 Lands of United Worldwide Express, LLC at 1600 North Little Creek Rd and Adjacent Parcel at 0.509 AC North Little Creek Road

Although Dover Kent MPO does not have any objections to the proposed Rezoning, it is worth noting that several recent MPO studies pertain to these parcels. First, in the East/West Freight Routes Phase 2 Study, several new alignments were proposed in key locations across Kent County to improve freight conditions and facilitate the movement of goods. The most relevant proposal from the study is the SR 1 interchange, which would allow for direct access to SR 1 from North Little Creek Road.1 If completed, this project would benefit the industrial sites in the area and reduce the amount of truck traffic on surrounding roadways. The project is also a potential benefit to Dover Air Force Base, and several interchange options were evaluated in the

1 East/West Freight Routes Phase 2 Study. Dover/Kent County MPO (2025). https://doverkentmpo.delaware.gov/files/2025/07/East-West-Final-Report-with-Appendicies.pdf#page=16.

89

Paj 90

Item 4.

Dover Air Cargo Freight Access Study.2 However, the interchange project would significantly impact the properties being discussed through this application, as the proposed alignment would run directly through the parcels. With this in mind, the City of Dover and the applicant should review the recommendations of the East/West Freight Routes Phase 2 Study and discuss how the parcels can be utilized while still meeting the greater needs of the freight community in Kent County.

The second relevant study is the Dover Freight Plan, a document that outlines the City’s freight goals and recommends a path forward to achieving them. Some of the steps listed in the document include requiring truck parking and staging areas for all freight-related site development, creating opportunities for freight-intensive development along truck routes, and increasing coordination between local and State agencies and other relevant stakeholders.3 The applicant should be aware of the City’s freight goals and ensure the plans for these properties help work towards the goals’ completion.

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.

2 Dover Air Cargo Freight Access Study - Planning and Environmental Linkage (PEL) Report. Dover/Kent County MPO (2021). https://doverkentmpo.delaware.gov/files/2021/09/Dover-Air-Cargo-Freight-Study- PEL_final.pdf#page=25. 3 Dover Freight Plan. City of Dover (2025). https://doverkentmpo.delaware.gov/files/2025/04/2025-04_Dover- Freight-Plan_FINAL.pdf.

90

Paj 91

Item 4.

91

Paj 92

5-05-068.20-01-56.00-000 NIC HO

(OFF RAM ZONED R-8 LAS DR

N.O.F. IVE

P)
STATE OF DELWARE NORT
H LIT
TLE CR
EEK RO
STATE ROUTE 1 AD

X LAN E

FAIRFA

STA
NORT
TE ROUTE
H LITTL AY

/ EXPRESSW

STATORTHBOUND) E CRE (FREEWAY (DELA W ARE EK RO #1 AD STATE ROUT (80' W E #8) IDE

E R OU ) 22'± 702'± TO NICHOLAS

(SOU DRIVE

C8 C1 318'± TO FAIRFAX LANE

(N UND) R OU T C2 NE C3 X LA (60' W EXPRESS, T H BO T E #1 2-05-068.20- LL

FAIRF
IDE
01-62.00-000 C E #1
A
0.52± AC.

UNITED WO L15 CURRENT ZONING: CP L16

RLD W IDE PROPOSED O UNITED W O ZONING: IP RLW IDE EX M PRESS, LLC LOCATION MAP SCALE: 1"=1000' 2-05-068.20- 01-61.00-000 (FREEW L14 L18

1
L17

OUTE #AY) KEY INDEX

1.77 ± AC.

STATE R (W IDTH AY SEPTIC REZONING - CURRENT ZONING: C VARIES) SSW PROPOSED PO

/ EXPR E C4 WETLANDS -

ZONING: IP
L19
M
C7

L2 2 L2 1 3 L20 LINE BEARING DISTANCE L2 L1 S 86°43'12" W 20.00' L2 S 00°49'32" E 71.97' L3 S 00°49'32" E 82.66' L4 S 88°07'03" W 115.00' N.O.F. L5 S 02°34'03" E 404.14' STATE OF DELWARE L6 S 87°45'58" E 125.01' STATE ROUTE 1 L7 N 50°03'24" W 302.67' UNITED WORLWIDE EXPRESS, LLC L8 N 85°02'34" W 241.97' L9 N 50°03'24" W 31.95' L13 2-00-068.20-01-15.00-000 L1 L10 N 19°38'41" W 502.78' 5.12± AC. CURRENT ZONING: IL L11 S 31°50'26" W 33.84' PROPOSED ZONING: IPM L2 L12 S 85°49'01" W 392.38' L13 N 19°38'41" W 308.86' L14 N 08°45'20" E 343.64' IL ZONE L12 ZONING DISTRICT BOU NDARY LINE L15 N 05°37'04" E 236.18' RMH ZONE L16 N 05°37'26" E 236.42' L1 L3 L17 S 82°22'34" E 65.00' 1 L18 S 82°22'56" E 30.20' L4 L19 N 05°37'26" E 245.00' UNITED WORLWIDE EXPRESS, LLC L20 N 88°55'26" E 144.00' 2-00-077.00-01-07.00-000 L21 N 36°19'34" W 79.07' 3.15± AC. L22 N 27°55'12" E 51.19' CURRENT ZONING: RMH L23 N 31°59'09" E 43.40' Y PROPOSED ZONING: IPM

ER WA RUBAK IDE CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING (60' W C1 2894.90' 124.90' 124.89' S 80°20'42" E C2 2894.90' 95.25' 95.25' S 82°31'25" E N.O.F. L10 L5 C3 2894.90' 102.82' 102.82' S 84°29'01" E A SUBDIVISION KNOWN AS C4 5884.23' 648.59' 648.26' N 07°02'05" W "ROJAN MEADOWS" C5 21539.48' 77.09' 77.09' S 02°52'48" W AS RECORDED IN PLAT C6 21539.48' 173.65' 173.65' N 02°58'30" E BOOK 153, PAGE 34 C7 361.01' 94.46' 94.19' N 16°21'32" E ZONED RM-1/PND, C8 25.00' 14.26' 14.07' S 25°05'47" W AEOZ-APZII

L6

L9 UNITED WORLDWIDE EXPRESS
C5
L8 2-00-077.00-01-07.01-000
0.48± AC.
CURRENT ZONING: RMH
PROPOSED ZONING: IPM

L7
C6

AD
RO E
A N I D
R OJ 0' W
(6

REZONING PLAN NOTES OF CURRENT OWNER OF RECORD: UNITED WORLDWIDE EXPRESS. LLC 605 INTERCHANGE BOULEVARD UNITED WORLDWIDE EXPRESS, LLC NEWARK, DE 19711 NORTH LITTLE CREEK ROAD ENGINEER: SCOTT ENGINEERING, INC. DOVER, DE 22 OLD RUDNICK LANE DOVER, DE 19901 SITUATE PARTIALLY IN: 1. TAX MAP PARCEL NO. 2-05-068.20-01-61.00-000 ZONED CPO 2-05-068.20-01-62.00-000 ZONED CPO CITY OF DOVER, EAST DOVER HUNDRED AND PARTIALLY IN EAST DOVER HUNDRED, KENT COUNTY, STATE OF DELAWARE 2. PROPOSED ZONING: IPM (INDUSTRIAL PARK MANUFACTURING)

  • 3.SETBACKS: EXISTING SCOTt ENGINEERING, INC. CPO - FRONT 10'; SIDE 5 (ADJOINING RESIDENTIAL 25'); REAR 15' Consulting Engineers Surveyors Land Planners
PROPOSED22 Old Rudnick Lane, Suite 2
IPM- FRONT 60', SIDE & REAR 40' (100' ADJOINING RESIDENTIAL ZONE)Dover, DE 19901302-736-3058
DRAWING NO.3220SCALE:1"=150'

DRAWN BY. S.E.I. RZ-1

Paj 93

Item 5.

City of Dover
DATA SHEET FOR CONDITIONAL USE SITE PLAN REVIEW

DEVELOPMENT ADVISORY COMMITTEE MEETING OF February 4, 2026

PLANNING COMMISSION MEETING OF February 17, 2026

Plan Title: Bay Pointe Apartments Project (One Building Concept), C-26-01

Plan Type: Conditional Use Site Plan

Previous Applications: C-20-05, C-21-04

Location: 1100 Bay Road, Dover DE 19901
Southwest side of Bay Road, end of Lafferty Lane

Tax Map IDs: ED-05-086.00-01-20.00-000

Owner/Applicant: Patel Hospitality Properties, LLC

Combined Site Area: 3.302 +/- acres

Zoning: C-4 (Highway Commercial Zone)

Current Use: Vacant Land

Proposed Use: One (1) Apartment Buildings with (54) Total Dwelling Units and associated site improvements - (38) 1-bedroom apartment units - (16) 2-bedroom apartment units

Off Street Parking: Required – 122 spaces
Proposed – 131 spaces

Water: City of Dover
Sanitary Sewer: Kent County Department of Public Works

For Consideration
Recreation Area: Active Recreation Area Plan
Required – 10,000 SF Active Recreation
Provided – 13,390 SF Recreation Area

  • P.O. Box 475 Dover, DE 19903 Community Excellence Through Quality Service 93

Paj 94

Item 5.
C-26-01 Bay Pointe Apartments Project
DAC Report of February 4, 2026
City of
Dover
CITY OF DOVER Planning
Office
DEVELOPMENT ADVISORY COMMITTEE

APPLICATION REVIEW COMMENTARY

D.A.C. MEETING DATE: February 4, 2026

APPLICATION: Bay Pointe Apartments Project (One Building Concept) at 1100 Bay Rd, Dover

FILE #: C-26-01 REVIEWING AGENCY: City of Dover Planning

CONTACT PERSON: Dawn Melson-Williams, Principal Planner PHONE #: (302) 736-7196

Note: This Review Report was initially prepared by Staff of the Rossi Group (under a Planning Services contract with the City of Dover). The DRAFT Report was completed with additional review and editing by the City’s Planning Office.

  • I.PLAN SUMMARY This application is for review of a Conditional Use Site Plan to permit the construction of a Multiple Family Dwelling Unit (Apartment) Building, a three-story 59,313 SF Gross Floor Area building with 54 apartment units (16 two-bedroom, 38 one-bedroom), and associated site improvements. The proposed Apartment building requires Conditional Use review in the C-4 (Highway Commercial Zone) zoning district. The three existing lots were consolidated into a 3.302 +/- acre parcel and are zoned C-4. The property is located on the southwest side of Bay Road at the intersection with Lafferty Lane. The owner of record is Patel Hospitality Properties. Property Addresses: 1080, 1100, and 1106 Bay Road. Tax Parcel Number: ED-05-086.00-01- 20.00-000.

II. PROJECT DESCRIPTION

The subject property is located at the southwest side of Bay Road, with Delaware Route 1 running alongside the west and north portions of the project site, at the intersection of Lafferty Lane. The applicant proposes to construct one (1) three-story Multiple Dwelling-Unit (Apartment) Building of 54 total Dwelling Units (16 two-bedroom, 38 one-bedroom) and to be known as Bay Pointe Apartments.

The property is surrounded on the west, north and south by right-of-way for Delaware Route 1. Properties across Bay Road to the east and north of Lafferty Lane are also zoned C-4 (Highway Commercial Zone) and C-3 (Service Commercial Zone). Across Bay Road to the east and south of Lafferty Lane is the Kings Cliffe Manufactured Home Parke, which is zoned MH (Manufactured Housing Zone). Previous Application C-21-04 Bay Pointe Apartments (One- Building Concept) was approved by the Planning Commission in May 2021 and with an updated Active Recreation Plan. As the time period for the plans has expired, this application C-26-01 is a resubmission of the Plans.

94

Paj 95

Item 5.
C-26-01 Bay Pointe Apartments Project
DAC Report of February 4, 2026

Previous Applications The subject property was previously the subject of another Conditional Use Site Development Plan with associated Lot Consolidation Plan identified as C-20-05; it was also named “Bay Pointe Apartments.” Application C-20-05 was submitted by the same Applicant and had similarly sought to develop the combined parcels as Apartments, but as two (2) Buildings. The Application C-20-05 as a two-building concept proposal similarly noted (54) total planned dwelling units (apartment) but proposed limited Active Recreation Space and showed a different drive aisle/parking space configuration design of the site. Application C-20-05 was heard by the Planning Commission at their December 2020 meeting but was not approved.

The applicant then submitted a Conditional Use Site Development Plan with associated Bay Pointe Apartments as a One-Building Concept and with an updated Active Recreation Plan identified as C-21-04. The application was approved by the Planning Commission in May 2021 and after receiving an Extension of Approval in May 2023; it then achieved Final Plan Approval on June 27, 2023. An Administration Building Permit to start the temporary site entrance and site clearing activities was issued. Since this authorized site work did not continue beyond the basic stone entrance the plan approval expired. The parcel consolidation that was part of C-21-04 was recorded.

III. ZONING REVIEW

C-4 (Highway Commercial Zone) The application is a Conditional Use Site Plan for the proposed construction of one apartment building. Apartments and multi-family dwellings in the C-4 Zone are Conditional Uses which require approval from the Planning Commission. (Zoning Ordinance, Article 3 Section 16.2)

Article 3 Section 16.1 Highway commercial zone (C-4) 16.1 Uses permitted. In a highway commercial zone (C-4), no building or premises shall be used, and no building or part of a building shall be erected, which is arranged, intended, or designed to be used, in whole or in part, for any purpose, except the following: (a) Retail stores. (b) Business, professional or governmental offices. (c) Restaurants. (d) Personal service establishments. (e) Service establishments. (f) Hotels and motels. (g) Places of public assembly. (h) Bus terminal. (i) Wholesale, storage, warehousing, and distribution establishments. (j) Indoor or outdoor recreation and amusement establishments. (k) Hospitals and medical centers. (l) Drive-throughs. (m) Motor vehicle, boat, or farm equipment sales or service: (1) The minimum lot size for such establishments shall be 20,000 square feet, and the minimum street frontage shall be 150 feet. (2) Entrance and exit driveways shall have an unrestricted width of not less than 16 feet, shall be located not nearer than ten feet from any property line and shall be so laid out as to avoid the necessity of any vehicle leaving the property to back out across any public right-of-way or portion thereof. (3) Vehicle lifts or pits, dismantled and disabled automobiles, and all parts or supplies shall be located within a building enclosed on all sides. (4) All service or repair of motor vehicles, other than such minor servicing as change of

95

Paj 96

Item 5.
C-26-01 Bay Pointe Apartments Project
DAC Report of February 4, 2026

tires or sale of gasoline or oil, shall be conducted in a building fully enclosed on all sides. This requirement shall not be construed to mean that the doors to any repair shop must be kept closed at all times. (5) The storage of gasoline or flammable oils in bulk shall be located fully underground in accordance with applicable provisions of the National Fire Protection Association Code. (6) No fuel pumps shall be located nearer than 15 feet to any street line. (7) Fuel pumps shall not be permitted closer than 100 feet from a property line of any school, day care, church, hospital, nursing home, or place of public assembly designed for the simultaneous use and occupancy by more than 100 persons. (n) Manufacturing, assembling, converting, altering, finishing, cleaning, or any other processing of products for sale on or off the premises, provided that not more than 25 persons shall be engaged in such activity; and provided further, that any such use shall be subject to the performance standards procedure as set forth in article 5, section 8. (o) Mini-storage facilities, subject to the following regulations: (1) No unit shall be placed within 30 feet of a residential property line. (2) No outside storage, except for recreational vehicles, boats, or personal automobiles when completely parked in specifically approved locations. Parking for these vehicles shall not count toward the required parking set forth in subsection (e) below. (3) No individual unit may be used for retail, garage sale, or any other commercial activities. (4) No storage of flammable, explosive, corrosive, or other hazardous products may occur in the individual unit. (5) Parking must be provided at a ratio of one space for each 25 rental units, plus a minimum of three spaces for an office. (p) Adult entertainment establishments, subject to the provisions stated in article 5, section 13.

16.2 Conditional uses. The following uses are permitted, conditional upon the approval of the planning commission in accordance with the procedures and subject to the general conditions set forth in article 10, section 1: (a) Apartments and multi-family dwellings. (b) Crematory, subject to the following requirements: (1) The building lot line upon which a crematory is to be established shall be located at least 100 feet from any residential zone. (2) Where adjacent to residential zones, all landscape buffers shall be required. The buffer shall consist of a landscape screen no less than six and one-half feet high. All landscaping shall be properly maintained throughout the life of the use on lot. (3) Loading operations shall be conducted within a completely enclosed building. Location of loading doors shall be at the side or rear of the building. (4) The crematory shall comply with the Delaware Incinerator Regulations. A copy of the approved air pollution permit issued by the State of Delaware Department of Natural Resources and Environmental Control shall accompany the application for a certificate of occupancy.

This Conditional Use Site Plan is subject to the requirements of Article 10 §1 further discussed below.

With Conditional Use Site Plan applications, the Planning Commission reviews the proposed project to determine whether or not the intended use is appropriate in type and scale for the immediate neighborhood. The Commission must also consider whether or not the proposed use will have an adverse impact on the future orderly development of the surrounding area. The following sections of the Zoning Ordinance which relate to the role of the Commission in

96

Paj 97

Item 5.
C-26-01 Bay Pointe Apartments Project
DAC Report of February 4, 2026

reviewing Conditional Use Site Plan applications are particularly relevant when reviewing this application:

Article 10 §1.1 Accessibility for emergency response. That all proposed structures, equipment or material shall be readily accessible for fire, ambulance, police, and other emergency response;

1.2 Harmony of location, size and character. That the proposed use shall be of such location, size and character that, in general, it will be in harmony with the appropriate and orderly development of the zone in which it is proposed to be situated and will not be detrimental to the orderly development of adjacent properties in accordance with the zoning classification of such properties;

IV. PARKING SUMMARY

The parking requirement for apartments in the C-4 (Highway Commercial Zone) is based on a rate of two (2) parking space per dwelling unit plus 0.25 space per dwelling unit for visitor parking and one parking space for every 200 SF of office space. Based on the number of dwelling units (54 units), this site would require 122 parking spaces. The submission does not indicate office space. The plans submitted identify a total of 131 parking spaces, including six (6) ADA-accessible parking spaces. The typical parking spaces are nine feet wide and the ADA parking spaces are eight feet wide. Four of the ADA spaces abut a 60-inch access isle.

The Plans only indicate there is one van accessible space provided. However, two of the six handicapped parking spaces are van accessible - sharing the 120-inch access isle, but only one is labeled as such. While the minimum required number of van accessible spaces (1) has been met, that similarly placed space could be utilized as a second van accessible space with matching signage.

The Plans note the location of the van signage in the space next to the one labeled “VAN”, not in the space itself and should be moved to align with the van accessible space. Also, the van signage does not appear to comply with ADA requirements in that van accessible spaces must have two signs, the international symbol of accessibility and a second sign stating that the space is van accessible, mounted at least 60 inches above the ground (measured to the bottom of the sign). The signage shown on Sheet 11(4) has the van access sign below the 60-inch height requirement indicated for the sign above whereas the signage height should be measured from the bottom of the lowest placed sign on the mount.

Supplementary Parking Requirements Article 6 §5.3 of the Zoning Ordinance lays out additional stipulations for parking specific for “Multiple Dwelling” (Apartments):

5.3 Supplementary parking regulations for multiple dwellings. No parking space shall be located in any front yard or within three feet of any lot line in side or rear yards. The parking of motor vehicles within 15 feet of any wall or portion thereof, is prohibited. Except for electric vehicle charging stations, no automobile service shall be permitted to be extended to users of the lot, including sales, repair or fueling, and no gasoline, oil, grease, or related supplies shall be stored or sold in any such lot or in any garage on such lot.

97

Paj 98

Item 5.
C-26-01 Bay Pointe Apartments Project
DAC Report of February 4, 2026

The plans submitted note the distance between the physical parking spaces and the main structure of the building with the closest being 15.39 feet from the main structure. Planning Staff confirms the current layout meets these parking criteria.

Bicycle Parking Bicycle parking is required at a ratio of one space for every twenty parking spaces. If the site is to be served by 131 parking spaces, seven (7) bicycle parking spaces are required. The Data Column notes eight (8) bicycle parking spaces are planned, and the Site Plan shows them located on the northwest side of the Apartment Building in a covered bike rack.

  • V.SITE CONSIDERATIONS

Access There is one entrance proposed to the site: a full access drive at the signalized intersection of Bay Road and Lafferty Lane. The design of the entrance access to Bay Road is subject to review by DelDOT, as Bay Road is a state-maintained road. The Entrance connects to the main two-way drive which loops around the entirety of the main building. Most parking spaces are shown to have direct access to this main drive aisle.

Sidewalks Sidewalks are required along the Bay Road street frontages of the site (Zoning Ordinance, Article 5 Section 18). The plan shows a multi-use path of ten (10) feet in width as required along the Bay Road frontage. Sidewalk is proposed on the south side of the proposed entrance drive from Bay Road leading into the site connecting to a sidewalk that runs along the inside of the Parking Lot area and encompasses the entirety of the Apartment Building. The on-site sidewalk system connects across the Parking Lot to the north where the Plans show an Active Recreation Area is to be provided.

Pedestrian access into the Apartment Building is currently shown at the center of the western façade, as well as the southeast and northeast ends of the eastern façade. This access appears to be sufficient to access the Building from various points.

There is a multi-use pathway known as the St. Jones Greenway on the west side of State Route 1; however, it is not readily accessible from the subject property. Additionally, there are currently no other sidewalks or multi-use paths along either side of this Bay Road segment. The multi-use path proposed in this plan would be the start of a pedestrian system in this southern segment of Bay Road. However, it would not directly connect to other pedestrian-only facilities; the roadway system does have limited paved shoulders.

There are five (5) crosswalks included on the Plans: at the south sidewalk entrance across the parking lot, the north end of the building to the Active Recreation Area, across the Bay Road front entrance through the traffic islands, from the south-end of the front crosswalk island crossing from Bay Road to the island on Lafferty Lane, and across the traffic islands on Lafferty Lane. It is unclear from the Plans if the crosswalks at the intersection will also have Accessible Pedestrian Signal (APS) pushbuttons or pedestrian lights installed to facilitate safe crossing – especially crossing both Bay Road and Lafferty Lane.

98

Paj 99

Item 5.
C-26-01 Bay Pointe Apartments Project
DAC Report of February 4, 2026

Curbing Upright curbing for the parking lots and drive aisles is required per the requirements of Article 6 Section 3.6(b) of the Zoning Ordinance. This curb type appears to be utilized throughout the site layout. Pedestrian connections with detectable warning surfaces are present at each of the crosswalk connections.

Lighting Lighting is proposed throughout the site where parking is provided. Most lighting is located along the perimeter and on the parking islands in the larger parking lot area (Sheet 8). It is unclear if there will be exterior lighting on the Apartment Building itself.

Rear Emergency Access Emergency rear access is required for some residential dwelling types. According to Article 5, Section 17 of the Zoning Ordinance a 16 ft. wide alley or 18 ft. wide Secondary Fire Lane is required for apartments that are 2-3 stories to serve as rear access. This is to provide access to rear building areas. The Plans submitted note that the access drive aisle planned around the entire perimeter of the building is (24) feet wide which satisfies the Rear Emergency Access requirements of the Zoning Ordinance. It remains unclear as to which façade (west or east elevation) serves as the front (and rear) of the Apartment Building.

The Fire Marshal’s Office will also evaluate these fire protection measures as related to the fire lane requirements of the applicable Fire Codes.

Dumpsters According to Zoning Ordinance, Article 5 §6.12, the Dumpster requirements for an Apartment Complex are two (2) Dumpsters required for the first 48 apartments, and one (1) for each additional 24 apartments or fraction thereof. The plans submitted identify one (1) Dumpster enclosure, containing three (3) Dumpster units. This is therefore compliant with Code requirements.

The plans submitted further identify the details of the Dumpster enclosure. Specifically, it will be surrounded by an eight-foot-tall CMU dumpster enclosure. This enclosure is also shown to have gates. The gate material is stated as a wood privacy fence. The placement of the dumpster enclosure appears to be out of the 30-foot setback requirement for Article 5 §7.3 Arterial street buffers, but the distance of that structure from the right-of-way is not labeled on the Development Plan.

Arterial Street Buffer According to Zoning Ordinance, Article 5 §7.3, a 30-foot buffer is required for nonresidential zoned property that fronts on a principal arterial street. The northwest side of this C-4 (Highway Commercial Zone) parcel abuts Delaware Route 1 and a 30-foot buffer from the right-of-way is therefore required. The same is required along Bay Road.

7.3 Arterial street buffers. Where nonresidential zoned property fronts on a principal arterial street, as designated by the comprehensive plan, a landscape buffer shall be required in addition to normal landscaping of the street right-of-way. This landscape buffer shall be required when the property is subject to site development plan review or site development master plan review by the

99

Paj 100

Item 5.
C-26-01 Bay Pointe Apartments Project
DAC Report of February 4, 2026

planning commission according to appendix B, zoning, article 10, planning commission. Arterial street buffers shall be a minimum of 30 feet in depth, measured from the right-of-way line of the arterial street.

The Development Plan shows the buffer as a “30-foot Arterial Street Setback” and appears to be in compliance with the ordinance.

VI. BUILDING ARCHITECTURE

The Plan submission includes Architectural Renderings presenting a single elevation noted as the “Front elevation.” The Drawing also does not include a rendering of the “rear” (west) side of the building nor the north and south ends of the structure.

The Rendering shows only one elevation, labeled “Front Elevation.” This elevation appears to be the east elevation that fronts Bay Road. There are no main entrances labeled in the rendering but rather shows a series of patios with two patio doors at ground level at the rear. It is assumed these unlabeled rear doors are specific to particular units and the one double-door entrance at the rear (west side) of the building shown on the Development Plan is the main entrance.

The exterior finish of the Apartment Building is comprised of a stone veneer at the first-floor watertable level and then horizontal siding for the remainder of the first, and then second and third levels. This siding is shown in three neutral colors: slightly lighter and darker beige colors, as well as a gray color. The exact materials proposed are not specifically identified. The horizontal lines of the siding are broken by the vertical protrusions of the balconies which are lined with white vertical trim and encased with black railings. As with the wall materials, the trim and railing materials are also not identified. The drawings show a flat roof.

VII. TREE PLANTING AND LANDSCAPE PLAN

Zoning Ordinance, Article 5 §16 lays out the requirements for tree planting and preservation. A new project is required to provide tree planting at a rate of one (1) tree per 3,000 SF of the “Development Area.” With a stated overall site area of 143,857 SF, this would put their tree plantings requirement at a minimum of forty-eight (48) trees. The current landscaping plan is proposing to plant 54 new trees.

The Landscape Plan (Sheet 7) indicates that there are 0.00 AC of woodlands in the project area. However, the Active Recreation Area Plan lists the prior use as “vacant, wooded” and portions of the Existing Conditions (Sheet 2) that are to be cleared for the development currently appear to contain woodland-type vegetation (approximately 54,000 SF) and would therefore require tree preservation measures per Article 5 §16 of the Zoning Ordinance if the vegetation to be cleared meets the Article 5 §16.2 definition.

Article 5 §16.2 Definitions Woodland. An area of contiguous wooded vegetation (7,500 square feet or greater), where trees exist at a density of at least one tree with a caliper dimension of six inches or greater per 375 square feet of land and where the tree branches form a contiguous canopy.

Article 5 §16.5 Woodland Preservation 16.51 Tree preservation and selective clearing plan required. All site development proposals which involve the development of woodland areas and require planning commission approval

100

Paj 101

Item 5.
C-26-01 Bay Pointe Apartments Project
DAC Report of February 4, 2026

shall include a tree preservation and selective clearing plan as part of the submission plan. The tree preservation and selective clearing plan shall be prepared in accordance with the provisions of subsection 16.5, subsection 16.7 and subsection 16.8 of this section.

The submitted plan includes the landscaping approach for the overall project. The current Landscape Plan (Sheet 7) and Existing Conditions (Sheet 2) do not include Notes or statements if the site was evaluated by a licensed professional and determined to have no woodlands present. The Landscape Plan shows a mixture of deciduous trees, evergreen trees, and flowering trees to provide a total of 54 trees, meeting the minimum requirements for non-woodland areas. The trees are proposed in groupings along the Bay Road frontage, adjacent to the building, and along the periphery of the parking lot. It appears that some of the proposed tree plantings may conflict with underground Stormwater Management Facilities.

VIII. ACTIVE RECREATION AREA

The Zoning Ordinance, Article 5 §10 sets out requirements for open space and recreation areas within residential developments. Zoning Ordinance, Article 5 Section 10.514 notes that a residential development of 10 or fewer acres with a density over six (6) units per acre shall provide Active Recreation at a rate of 150 SF of active recreation area per dwelling unit, or 10,000 SF of active recreation area, whichever is greater. As the development overall is proposed to provide 54 total dwelling units (requiring 8,100 SF), the site would be required to provide a minimum of 10,000 SF of Active Recreation Area. The Site Plan submitted shows a designated Active Recreation Area of 13,390 SF +/- provided at the north end of the site.

The Active Recreation Area includes several amenities including a gazebo with picnic table area, kayak storage, outdoor fitness area, and a sand volleyball court. A sidewalk provides direct access to the Active Recreation Area from the main Apartment Building and across the parking lot. There is also a sidewalk linkage from the Recreation Area to the multi-use path along Bay Road. There are no exterior lights within the Active Recreation Area. The Active Recreation Area proposal will also be evaluated in a separate Review Report.

IX. CITY AND STATE CODE REQUIREMENTS:

The subject proposal has been reviewed for code compliance, plan conformity, and completeness in accordance with the agency’s authority and area of expertise. The following items have been identified as elements which need to be addressed by the applicant:

  • 1)The Planning Commission must review and make a determination regarding the Conditional Use for an Apartment Building use in the C-4 zone.
  • 2)The Active Recreation Plan will reviewed by the Parks, Recreation and Community Enhancement Committee. This review is scheduled for February 10, 2026. A separate Active Recreation Area Plan Report will be issued.
  • 3)Site Improvement Plan, Sheet CS-1001:
  • a.Include all bulk standards both as required and proposed.
  • b.Note the setback, parking, and tree count both as required and proposed.
  • c.Include the tree planting and landscaping figures, both as required and as proposed.
  • d.Update Site Plan for location of van accessible signage to align with van accessible

101

Paj 102

Item 5.
C-26-01 Bay Pointe Apartments Project
DAC Report of February 4, 2026

parking space e. Include labeling for all pedestrian connections and types. f. Update the Site Data Column and other parcel references to reflect the parcel consolidation. The parcel number should be listed as ED-05-086.00-01-20.00-000.

  • 4)CS2201 Lighting Plan:
  • a)Please note if there is to be any lighting proposed on the perimeters of the buildings themselves this detail should be included on the Architectural Renderings. The Lighting Plan does not include any lighting coverage for the Active Recreation Area.
  • 5)In addition to labelling the building elevation as “Front,” please also note the façade based on its relative cardinal direction (east, west, etc.).
  • 6)CS0201 Existing Conditions Plan:
  • a)It is noted that there is currently 1,049 SF of impervious surface on the site. Please ensure that this area is identified and quantified in the Notes column on CS0201 (Existing Conditions Plan).
  • 7)CS2001 Landscape Plan:
  • a)Staff recommends including notation withing the Landscape Plan that the site was independently assessed by a licensed professional for the presence of woodlands and if the vegetation to be cleared meets the Article 5 §16.2 definition. If so, include submission of a tree preservation plan with the inclusion of tree mitigation practices, as necessary. Please ensure that this is identified on Sheets CS0201 (Existing Conditions Plan) and CS2001 (Landscape Plan). If tree mitigation is required, all tree mitigation must occur on-site unless an off-site location is specifically approved by the planning commission. If an evaluation determined that there is no woodland present, please add a note to verify this on the Landscape Plan.
  • b)Ensure placement of any trees/ landscaping does not conflict with any underground utilities/ stormwater management systems and other utilities, complies with separation distances.
  • c)Please show the multi-use path.
  • 8)CS6001 Site Details:
  • a)Update Sheet CS6001 (Site Details) signage for the van accessible sign height to be measured from the bottom of the lowest placed sign on the mount.
  • b)Update Sheet CS6001 (Site Details) to include a “Type 1” pedestrian connection diagram identified from Sheet 3.

IX. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES: In accordance with the Zoning Ordinance, Article 10 §1, the Planning Commission in considering and acting upon Conditional Use Plans may prescribe appropriate conditions and safeguards so that the public health, safety, and welfare, the comfort and convenience of the public in general, and the residents of the immediate neighborhood in particular shall be taken into consideration. These safeguards may to the maximum extent possible further the expressed

102

Paj 103

Item 5.
C-26-01 Bay Pointe Apartments Project
DAC Report of February 4, 2026

intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed in subsections 1.1 to 1.2. 1) Conditional Use for Apartments: The request is for the construction of Apartments through the Conditional Use process. The location of this residential development is in proximity to other residential areas (a manufactured home community), to a variety of commercial, service, and office establishments, and employment opportunities. The location is very close to Dover Air Force Base (DAFB) and may provide an opportunity for housing of personnel and their families. The property location is on Bay Road near an access point to Delaware Route 1 and therefore is easily accessed by vehicle but has more limited pedestrian access. a) The development offers another residential housing option in the City in the form of a higher density apartment use, which supports affordable housing goals. b) Evaluate and implement any building construction techniques that may be necessary to abate nearby traffic noise.

  • 2)Active Recreation Area: Staff is satisfied with the proposed plan to meet the Active Recreation Area requirements provided by the Applicant. Planning Staff notes that the minimum size required for the Active Recreation for this project is 10,000 SF and the Applicant has identified an area dedicated to Active Recreation on site at 13,390 SF. Planning Staff would therefore recommend approval for the proposed Active Recreation Plan.
  • 3)Multimodal/ Pedestrian Accessibility: Accessibility should be provided throughout the site to ensure all tenants have equal access to all the site’s amenities and features. This should include:
  • a)At least one picnic table to be provided should have access to it provided by a sidewalk, and at least one (1) accessible space for seating.
  • b)Implement traffic control measures at the entrance area and drive aisle to facilitate movements and safe pedestrian entry.
  • c)Evaluate Landscape opportunities adjacent to the building for the privacy of 1st floor units, screening of equipment, etc. These, however, must remain compliant with fire safety requirements.
  • X.ADVISORY COMMENTS TO THE APPLICANT:
  • 1)In the event, major changes and revisions to the Conditional Use Site Plan occur in the finalization of the Conditional Use Site Plan contact the Department of Planning and Inspections. Examples include relocation of site components like paving and increases in floor area. These changes may require resubmittal for review by the Development Advisory Committee, Planning Commission, or other agencies and commissions making recommendations in regard to the Plan.
  • 2)Following Planning Commission approval of the Conditional Use Site Plan, the Plan must be revised to meet all conditions of approval from the Development Advisory Committee or as otherwise noted. A Check Print must be submitted for review by Planning Office Staff and the other commenting agencies. Upon determination that the

103

Paj 104

Item 5.
C-26-01 Bay Pointe Apartments Project
DAC Report of February 4, 2026

Plan is complete and all agency approvals have been received; copies of the Plan may be submitted for final endorsement (Final Plan Approval).

  • 3)Other agencies and departments which participate in the Development Advisory Committee may provide additional comments related to their areas of expertise and code requirements.
  • 4)For building new construction, the requirements of the building code and the fire code must be complied with. Consult with the Building Inspections Staff and City of Dover Fire Marshal regarding these requirements. The resolution of these items may impact the site design including such items as building dimensions and height, building openings, and fire protection needs, etc.
  • 5)The applicant/developer shall be aware that prior to any development or ground disturbing activities on the site the appropriate site inspections and permits are required. This includes activities to clean up existing vegetation, the import of fill dirt, etc.
  • 6)Construction may have an effect on the adjacent property owners and nearby travel lanes. Any work requiring the closing or rerouting of potential customers or visitors to adjacent properties should be coordinated as to offer the least amount of inconvenience to the adjacent property owners.
  • 7)The addresses for the new building proposed on the property will need to be confirmed with the City’s Tax Assessment Office. It appears that the consolidation of the properties has resulted in an address of 110 Bay Road.
  • 8)The applicant/developer shall be aware that prior to any ground disturbing activities on the site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections and permits are required.
  • 9)The applicant shall be aware that Conditional Use Site Plan approval does not represent a Building Permit and associated construction activity permits. A separate application process is required for issuance of a Building Permit from the City of Dover. Building Permits will be required for the apartment building and the active recreation amenities (i.e. gazebo).
  • 10)The applicant shall be aware that Plan approval does not represent a Sign Permit, nor does it convey permission to place any sign on the premises. Any proposed site or building identification sign may require a Sign Permit from the City of Dover prior to placement of any such sign in accordance with Zoning Ordinance, Article 5 §4.

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.

104

Paj 105

Item 5.

CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JANUARY 28, 2026

APPLICATION: Bay Pointe Apartments (One Building Concept) at 1100 Bay Road FILE #: C-26-01 REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services CONTACT PHONE #: 302-736-7025 CONTACT EMAIL: jlyon@dover.de.us

T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .

T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :

CITY AND STATE CODE REQUIREMENTS

SANITATION

  • 1.Every commercial customer shall provide such premises with a sufficient number of solid waste containers to provide adequate capacity for the solid waste placed out for collection without overloading the capacity of the containers. The City of Dover shall provide commercial customers with a maximum of two (2), 90-gallon trash containers and two (2), 90-gallong recycling containers.
  • 2.Trash collection site shall be oriented for side-loading pick-up if customer is utilizing City of Dover sanitation services.
  • 3.Any commercial customer requiring more containers, or larger containers, than provided above, must utilize private service. STORMWATER
  • 1.Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from Kent Conservation District is submitted to our office.
  • 2.The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert elevations must be labeled on all stormwater structures.
  • 3.Please coordinate with the City of Dover to obtain as-built information from a recent stormwater project. The installed infrastructure surrounds the property. STREETS
  • 1.Final site plan approval will not be granted until a letter of no objection, signed by DelDOT is submitted to our office.
  • 2.The current City of Dover standard street section provides for a 3’ grass strip between the curb and sidewalk. This standard was administratively revised to meet ADA and FHA compliance with cross slope requirements and to prevent cars from scrapping at driveways. The revised standard utilizes a five feet (5’) wide public sidewalk with a five feet (5’) wide grass strip behind the curb. Sidewalk and curb shall be installed for the width of the project scope.
  • 3.It shall be unlawful for any person to alter the curb of any street so as to create a curb depression for the purpose of permitting vehicles to enter onto or exit from the city streets, without a permit issued by the city manager. 105

Paj 106

Item 5.
Bay Pointe Apartments (One Building Concept) at 1100 Bay Road
File #: C-26-01
January 28, 2026

  • 4.Please provide an entrance plan for the work proposed on Innovation Way. At minimum, this plan shall provide the radius’ of the entrance, grade elevations and turning diagrams to provide evidence that the improvements will not be detrimental to traffic or drainage.
  • 5.Please add the following notes to the plans:
  • a.Standard City of Dover sidewalk, as per chapter 98, article IV of the Dover Code of Ordinances, shall be required to be installed along the entire public street frontage of a property. Where frontage sidewalk exists but does not meet the standards of chapter 98, article IV, the sidewalk shall be re-laid to meet the standards. Sidewalk shall include barrier-free access ramping at points of intersection with street crossings and at other locations so as to afford reasonable barrier-free pedestrian movement and site access.
  • b.In accordance to Appendix A, Article VI, Section B.3, all sidewalks shall ascend from the curbstone to the building line at the ratio of one-quarter of an inch to the foot. Nothing in this section shall be construed to affect any pavement previously laid by order of the city council, until it is taken up and relaid. WATER
  • 1.All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information.
  • 2.The following notes must be added to the plans:
  • a.Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project.
  • b.Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
  • c.The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736- 7025 prior to the start of construction. A representative from the City of Dover Department of Water & Wastewater must observe and approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted in the field due to conditions of the existing main. Possible conditions that would require tapping relocation include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be held responsible for field conditions requiring adjustment of the tapping location or for any work required by the contractor to make an appropriate and lawful connection.
  • 3.The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
  • 4.Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine the size of the domestic and irrigation (if applicable) water meter for the proposed building. These projections must be submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meter must be installed in a pit per City of Dover requirements and manufacturer’s recommendations. Also, a dual check valve is required downstream of the meter.
  • 5.The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap and valve are located within five feet (5’) to ten feet (10’) of the building. A blow up detail of this layout is recommended.
  • 6.Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The Department of Water & Wastewater will test and inspect all fire mains to a blind flange located inside the buildings. The blind flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the floor to the ninety degree (90) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through walls and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with mechanical designer.
  • 7.Water services shall be either type K copper or SDR-9. 1. All non-metallic water lines (mains and services) shall be installed with a tracer wire and identification tape. The wire shall be a minimum of twelve (12) gauge blue coated solid copper wire, wrapped 106

Paj 107

Item 5.
Bay Pointe Apartments (One Building Concept) at 1100 Bay Road
File #: C-26-01
January 28, 2026

around the pipe, and extending up into all valve and curb boxes. The identification tape shall be six-inches (6”) wide, laid one foot (1’) above the pipe, with the following text: “Caution: Buried Water Line Below”. 3M marker balls, model 1423-XR, or approved equal shall be installed at every service line connection to the water main and all bends on the service line. 8. On October 24, 2022, City of Dover Council approved the new Cross Connection Control Program. This program requires certain backflow prevention assemblies on water service connections to the city’s distribution system. Please provide a specific description of the activities within this project. 9. A minimum of fifteen feet (15’) shall be provided between the fire hydrant and fire hydrant valve. WASTEWATER 1. The wastewater main that is existing belongs to Kent County Department of Public Works, their approval of this plan will be required prior to staff provided our final approval. GENERAL 1. All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must be included as a note on the plan. 2. No trees may be planted within ten feet (10’) of utility infrastructure. 3. The final site plan must be submitted in the following compatible digital formats: a. AutoCAD 2018 (.dwg format). b. Adobe Reader (.pdf format).

RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES WATER / WASTEWATER / GENERAL 1. None

ADVISORY COMMENTS TO THE APPLICANT

WATER

  • 1.The City of Dover water system is available to this site. The developer is responsible for all costs associated with extending and providing service to the proposed development.
  • 2.Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking Water for review and approval. The owner/developer will be responsible for providing all completed forms and plan sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the Office of Drinking Water until review has been completed by our office.
  • 3.Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water & Wastewater directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the site.
  • 4.Water impact fees will be required to be paid prior to Certificate of Occupancy for this project. WASTEWATER
  • 1.None. GENERAL
  • 1.Please provide a profile to confirm that all utilities are installed with proper clearances from the proposed storm sewer line.
  • 2.The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned, flowable fill may be required.
  • 3.This project will require a State Utility Permit to be submitted to Delaware Department of Transportation. This application shall be created by the developer. 107

Paj 108

Item 5.
Bay Pointe Apartments (One Building Concept) at 1100 Bay Road
File #: C-26-01
January 28, 2026

  • 4.Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team- logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88.

I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .

108

Paj 109

Item 5.

CITY OF DOVER ELECTRIC
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: JAN 28, 2026

APPLICATION: Bay Pointe Apartments (One Building Concept) at 1100 Bay Road FILE #: C-26-01 REVIEWING AGENCY: City of Dover Electric Department CONTACT PERSON: Shawn Burgett, Engineering Services & System Operations Superintendent

CONTACT PHONE #: 302-674-7568

CONTACT EMAIL: sburgett@dover.de.us

T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .

T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :

CITY AND STATE CODE REQUIREMENTS

ELECTRIC

  • 1.Any relocation or upgrade of existing electrical equipment will be engineered by the City of Dover Electric Department. Developer may be required to perform a quantity of the relocation. Any work performed by the City of Dover will be at the owner’s expense.
  • 2.Owner is responsible for locating all existing underground facilities to include electric, water and gas.
  • 3.Owner is responsible for site and/or street lighting.
  • 4.Must maintain 10' clearance around all electrical equipment, unless pre-approved by the City of Dover Electric Engineering Department.
  • 5.Prior to the completion of any/all designs and estimates, the owner is responsible for providing the Electric Engineering Department with a physical address of the property.
  • 6.All Engineering and design for Dover Electric will be engineered upon receipt of final approved plans. All Engineering work will be furnished by the City’s Electric Engineering Department. GENERAL
  • 1.Final site plan must be submitted in a digital format compatible with AutoCAD 2010 (.dwg format) and Adobe Reader (.pdf format), if applicable. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES
  • 1.Owner must give the City of Dover Electric Department three (3) months’ notice prior to construction. Owner is responsible for following the requirements outlined in the City of Dover’s Electric Service Handbook. The handbook is now available on the website at the following link: https://evogov.s3.amazonaws.com/media/27/media/13108.pdf. 109

Paj 110

Item 5.
Bay Pointe Apartments (One Building Concept) at 1100 Bay Road
File #: C-26-01
Jan 28, 2026

ADVISORY COMMENTS TO THE APPLICANT

  • 1.Provide load sheets as soon as possible for proper sizing of transformers and creation of primary fee estimates. Current load sheets can be found at the following link: https://www.cityofdover.com/media/Electric%20Department/COD%20Electric%20Load%20Sheet.pdf.
  • 2.Electric service is currently provided by the City.
  • 3.If any upgrade to electric supply needs to be accomplished, customer will be responsible for all costs associated with the project.

I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .

110

Paj 111

C F
C-26-01 I I
Item 5.
T R
CITY OF DOVER Y E

DEVELOPMENT ADVISORY COMMITTEE O M

F A APPLICATION REVIEW COMMENTARY R D.A.C. MEETING DATE: 01/28/26 D S O H V A E L R APPLICATION: Bay Pointe Apartments at 1100 Bay Rd

FILE #: C-26-01 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal

CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457 josika@dover.de.us

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.

THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE APPLICANT:

CITY AND STATE CODE REQUIREMENTS:

  • 1.Proposed occupancy classification is apartments.
  • 2.Building Access shall be no further than 50 feet from a primary entrance.

Where buildings are provided with an automatic sprinkler system installed in accordance with NFPA 13, access shall be no further than 100 feet from the primary entrance. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)

  • 3.Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times the width of the door(s) or for 10 feet, whichever is greater. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
  • 4.Perimeter access shall be 75% and clearly shown on the plans.

Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings of two or more stories, measured from the face of the building at grade with a maximum slope of ten percent (10%). Plantings and utility services (includes condenser units, transformers, etc.) shall be permitted within the perimeter access, and shall not interfere with emergency services fire ground operations.

If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building perimeter shall not be included in the calculation of Percent of Perimeter Access. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)

Where parking is located between the building and perimeter access area, parking shall not be located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of two or more stories.

  • 5.Fire lanes shall cover 35% (plus rear access) of the proposed building. 111

Paj 112

Item 5.

Fire lanes are required to be 24 feet wide and run along the front of the building as determined by the primary entrance(s). In cases where there is more than one primary entrance(s), each shall be served by a fire lane even if this exceeds the percentage as required.

The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and the closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one or two stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in height. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5)

  • 6.Where parking is located between the building and the fire lane, parking shall not be located closer than 15 feet to the exterior wall. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1) Where parking is located between the building and the perimeter access area, parking shall not be located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of two or more stories. 2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5.2
  • 7.All Fire Lanes shall be marked as follows:

both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top and face of the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid yellow demarcation line shall mark the edge(s) of the fire lane. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)

  • 8.The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be suitable for street surfaces
  • 9.Fire lane signs shall be located as follows:

see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150 foot intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher than eight feet (8’) above the pavement, signs shall be placed at each end of the fire lane, and signs shall face all oncoming traffic.

Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in lieu of fire lane signs and shall conform to the specifications of 7.6. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)

  • 10.Where overhangs, canopies, balconies, or any other building or site features must project over any fire lane, an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall be provided and the portion of the building perimeter which contains overhangs, canopies, balconies, or any other building features shall not apply towards the fire lane accessibility requirements of Section 4.0, Table 5-1 in this chapter. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.8)
  • 11.All access roadways shall be paved and be a minimum of 20 feet clear width for two-way traffic and 14 feet clear width for one-way traffic. The paved width of access roadway shall be measured from edge of parking spaces, or face of curb for vertical curb and back of curb for mountable curb, or edge of pavement if there is no curbing.(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 5.2)
  • 12.Multiple Access Roads shall be provided when a fire department access road (fire lane) is determined by the Fire Marshal to be impaired by vehicle congestion, condition of terrain,

112

Paj 113

Item 5.

climatic conditions, or other factors that could limit access such as placement of fire hose from fire equipment.

  • 13.Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in reference to this process.
  • 14.Fire hydrants shall be installed per the requirements of City of Dover Public Utilities Water/Wastewater Handbook, NFPA requirements, and Delaware State Fire Prevention Regulations. City Ordinance Sec 46-9 (f). 5.1.1 Hydrant spacing as shown in the Fire Flow Tables shall be used as a general rule. Hydrants shall be located at the direction of the State Fire Marshal so as to minimize friction in fire hose. All hydrant spacing shall be located along available roads or at the direction of the State Fire Marshal. This measurement shall be calculated by way of accessible thoroughfare(s) from the building to be protected to the hydrant and may not necessarily be a radius. 5.1.3 Additional hydrants shall be provided when the State Fire Marshal deems it necessary based on the configuration of the site, building(s), exposures, construction, occupancy, and/or specific hazard(s). Fire Flow table 2, hydrant spacing shall be 800 feet on center for one and two family detached dwellings, other residential, rowhouses and townhouses, assembly, health care, business, education, storage, industrial, mercantile, and mini storage. (702, Chapter 6)

NFPA 1

18.5.2 detached one- and two-family dwellings, fire hydrants shall be provided for detached one- and two-family dwellings in accordance with both of the following: 1. the maximum distance to a fire hydrant from the closest point on the building shall not exceed 600 feet 2. the maximum distance between fire hydrants shall not exceed 800 feet.

18.5.3 buildings other than detached one- and two-family dwellings, fire hydrants shall be provided for buildings other than detached one- and two-family dwellings in accordance with both of the following 1. The maximum distance to a fire hydrant from the closet point on the building shall not exceed 400 feet 2. The maximum distance between fire hydrants shall not exceed 500 feet

  • 15.All fire hydrants shall be marked as prescribed within the appropriate section of this regulation and as illustrated by the appropriate figures of this regulation.

All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define specific areas, where fire hydrants are located along a curb line with permitted parking, the area between the fire hydrant and the street or fire lane shall be stenciled with four inch (4") demarcation lines and the words "NO PARKING", demarcation lines shall be measured from the center line of the fire hydrant and extend for a distance 15 feet on both sides.

Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked vehicles they shall be treated as follows: fire hydrants shall be protected in all directions for a distance of seven feet (7') with barriers or curbing, Minimum four-inch (4") diameter steel bollards filled with concrete and marked yellow shall be installed at the outermost corners of the fire hydrant demarcation area. The minimum height of the bollard shall be 36 inches above the finished grade of the adjacent surface, and the steamer connection of all fire hydrants shall be positioned so as to be facing the edge of the street, or traffic lane. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2) The owner is responsible if the hydrant is private.

113

Paj 114

Item 5.

  • 16.Hydrant barrels shall be provided with reflective material, such as paint, durable for highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel under the top flange, hydrant bonnets shall be color coded based on the following criteria: class AA 1500 GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 - 999 GPM - painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM - painted black. (2021 Delaware State Fire Prevention Regulations 703, Chapter 3. 4) The owner is responsible if the hydrant is private.
  • 17.Hydrants are to be Darling Co. B-62-B Breakaway https://american-usa.com/products/valves-and- hydrants/fire-hydrants/5-1-4-american-darling-b-62-b-5
  • 18.NFPA 72 compliant Fire Alarm System required per occupancy code requirements.

Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an occupancy determined to be a place of assembly by the fire marshal and is capable of receiving an occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with NFPA codes governing the installation of fire alarms and the National Electrical Code.

Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined to be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50 percent of the assessed value of the building and is capable of receiving an occupant load 75 persons or greater or is being enlarged to receive an occupant load of 75 persons or greater, shall be required to install a complete fire alarm system in accordance with NFPA codes governing the installation of fire alarms and the National Electrical Code.

Public mode audible requirements. To ensure that audible public mode signals are clearly heard by occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average ambient sound level or five decibels (dB) above the maximum sound level having a duration of at least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area required to be served by the system using the A-weighted scale dBA. In the event the stated requirement cannot be met a shunt trip relay/switches shall be the approved method of meeting the intent of this section of the Code. (City Code of Ordinances 46-171)

  • 19.Sprinkler system required. System is to be monitored by an approved Fire Alarm System.

This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions which are modified by more than 50% after the effective date of these Regulations. The 50% figure shall be calculated utilizing the gross square footage of the building, structure, marine vessel, premises and conditions as to arrive at the correct application.

Any proposal that is presented to the Office of the State Fire Marshal for review and approval for a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross square footage of a non-sprinklered building, may not have another such project for the same building submitted for review and approval any sooner than three (3) years after the date of the final inspection unless sprinkler projection is provided throughout the entire building.

In all buildings exceeding 10,000 square feet of aggregate, gross floor area.

In all buildings in excess of 40 feet in height or more than four (4) stories in height. 114

Paj 115

Item 5.

In all buildings or areas thereof used for the storage, fabricating, assembling, manufacturing, processing, display or sale of combustible goods, wares, merchandise, products, or materials when more than two (2) stories or 25 feet in height.

In all basement areas exceeding 2,500 square feet floor area.

In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and exceeding two (2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or

Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment buildings storage areas except individual unit closets that are located within individual residential living units.

In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA 101, as adopted and/or modified by these Regulations. In all buildings or areas classified as "high hazard" under the Life Safety Code, NFPA 101, or "extra hazard" under the Standard for the Installation of Sprinkler Systems, NFPA 13, as adopted and/or modified by these Regulations.

All buildings used as dormitories, in whole or in part, to house students at a public or private school or public or private institution of higher education. (16 Del.C. Ch. 88) This applies to all such dormitories regardless if new or existing.

(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)

Places of assembly shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13 when the following apply:

All new indoor places of assembly with an occupant load of 150 persons or greater.

Any interior renovations of 50 percent or more to an existing place of assembly with an occupant load greater than 150 persons.

Any additions or increase in interior size to an existing place of assembly that would create an occupant load of 150 persons or greater.

Places of assembly where alcohol is served for consumption on the premises shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13 when the following apply:

All new indoor places of assembly with an occupant load of 100 persons or greater and where alcohol will be served for consumption on the premises.

Any interior renovation of 50 percent or more to an existing place of assembly with an occupant load greater than 100 persons and where alcohol will be served for consumption on the premises.

115

Paj 116

Item 5.

Any additions or increase in interior size to an existing place of assembly which would create an occupant load of 100 persons or greater and where alcohol will be served for consumption on the premises.

New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13. (City of Dover Code of Ordinances 46-162)

NFPA 101, 12.3.5.1 The following assembly occupancies shall be protected throughout by an approved, supervised automatic sprinkler system in accordance with 9.7.1.1(1): 1. Dance Halls 2. Discotheques 3. Nightclubs 4. Bars 5. Restaurants 6. Assembly occupancies with festival seating

  • 20.Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow located within 50 feet of main entrance. Access to the Fire Department Connection must be clear unobstructed access as defined by the AHJ.

Fire department connections. Unless otherwise approved by the fire marshal, fire department connections shall be on the street side of the building and shall be located and arranged so that hose lines can be readily and conveniently attached to without interference from any nearby obstructions as defined by the fire marshal's office. Fire department connections shall be a five- inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover Fire Hydrant and within 50 feet of the main entrance of the structure it serves. All fire department connections shall be not less than three feet nor more than five feet in height above finished grade. The fire marshal shall have the authority to require more stringent requirements when deemed necessary. (City of Dover Code of Ordinances 46-162)

  • 21.Parking and/or obstructions shall be prohibited in front of fire department connections for a distance measuring from the center line and extending four feet on both sides. (2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
  • 22.Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose would come off the fire equipment.
  • 23.All standpipe and sprinkler connections shall be marked as prescribed within the appropriate section of this regulation and as illustrated by the appropriate figures of this regulation. All standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow demarcation lines to define specific areas, Solid yellow demarcation lines shall be measured from the center line of the connection and extend for a distance of four feet (4') on both sides, and where parking is allow between the building and the street or fire lane the solid yellow demarcation lines shall extend from the end of the sidewalk surface to the street or fire lane (Markings shall not be required on the sidewalk surface).

All fire department connections (standpipe and sprinkler) shall have a minimum 12" x 18" sign that reads FIRE DEPT. CONNECTION, sign lettering shall be a minimum of 3 inches (3") in height with red scotchlite letters on white scotchlite background. The sign shall be clearly visible from the fire lane or roadway, and signs using NFPA international symbols shall be an acceptable alternative. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)

  • 24.Standpipes shall be provided in all areas and buildings as required in the codes and standards listed in Regulation 701 as well as the following areas or buildings:

116

Paj 117

Item 5.

In all Class A and Class B places of assembly and institutional occupancies two (2) stories or 25 feet in height or over,

In any building over three (3) stories, In any building over 35 feet in height,

In any building that has a floor above the first floor over 10,000 square feet gross floor area,

In all buildings where the 1st floor exceeds 60,000 gross square feet,

a Class I horizontal standpipe system installed in accordance with the applicable codes and standards listed in Regulation 701 of these Regulations shall be provided. All standpipe systems shall be installed in accordance with the applicable codes and standards listed in Regulation 701.

The standpipe system shall be carried up with each floor and shall be installed and ready for use as each floor progresses.

Standpipes shall not be more than one floor below the highest forms of staging,

The 2½-inch of hose connections on Class I systems shall be provided in the following locations, At the highest intermediate landing between floor levels in every required exit stairway,

Where intermediate landing is not provided, hose connections shall be permitted to be located at the main floor landings in exit stairways when approved by the authority having jurisdiction, Where the local fire department has the capability of providing the required pressure, hydraulically designed standpipe systems in fully sprinklered, non-high-rise buildings shall be designed to provide the required waterflow rate.

A sign shall be provided at each landing, in all interior stairways, designating the floor level. (2021 Delaware State Fire Prevention Regulations 702, Chapter 4, 2)

  • 25.The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be protected from impact damage by impact protection. Natural gas and LP gas meters, regulators, and valves located inside structures shall have impact protection, except when located in separate protected utility rooms.

Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48 inches (four ft.) in height above the finish grade elevation. Any deviation of the stated requirements must be approved by the fire marshal and/or chief building inspector. The above dimensions shall serve as the requirement for installation; however, the fire marshal and/or chief building inspector shall have the authority to require more stringent dimensions to fit the needs of devices warranting impact protection.

Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors shall be of fluorescent or have a reflective coating. Any deviation of the stated requirements must be approved by the fire marshal and/chief building inspector. (City of Dover Code of Ordinances, 46-4)

  • 26.Every house, building or structure used or intended for use as living quarters or as a place for conducting business, and having any wall facing or abutting any public or private street or alley, shall have displayed on that wall, in legible, easily read characters which are of contrasting color to the background, the proper street number for such house, building, or structure in accordance with the following:

117

Paj 118

Item 5.

One-family and two-family residential structures, height, the number shall measure a minimum of four inches in height, location, the number shall be placed on the house above or to the left or right of the front entrance, color, the number shall be contrasting to the background color, Arabic numerals, all numbers shall be Arabic numerals.

Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when identifying individual apartments with exterior doors, and 12 inches when identifying buildings with apartment complexes where there are two or more buildings not assigned street addresses. Individual buildings with street addresses shall have numbers measuring six inches, location, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot, color, numbers shall be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic numerals.

Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in height, location generally, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot,

property line or driveway, should the building be located far enough from a public or private road so that the numbers are not clearly visible from the street, then the street address shall also be posted on the property at or near the property line or driveway to said building,

color; each building, numbers shall be contrasting to the background color and shall be placed on each building in the complex,

Arabic numerals, all numbers used shall be Arabic numerals,

Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number affixed to the front of the tenant space and on the outside of the rear door which corresponds with that tenant space. Numbers shall measure six inches in height. (City of Dover Code of Ordinances, 98-344)

  • 27.A lock box (Knox) containing any and all means necessary for fire department access shall be provided at the following occupancies: any occupancy that contains a fire alarm signaling system that is monitored off-site, or any occupancy that contains an automatic sprinkler system. (2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)

Secured key systems. When required; exemption. A secured key system shall be required for any new or existing building where a fire alarm or sprinkler system is being installed. It shall be the responsibility of the owner or occupant to keep a set of keys in the secured key box that are current to the locks of the protected occupancy. Buildings with 24-hour staffing or guard service shall be exempt from this subsection.

Location. The secured key system shall be located as close to the main entrance as possible. Should the building design not allow the secured key system to be located by the main entrance, the fire marshal and fire chief shall come to an agreement as to an alternate location for the key box. A secured key system, once installed, shall not be obstructed from view or obstructed by any means that would delay the fire department access to the box.

118

Paj 119

Item 5.

Required keys. Keys to be secured in the key box shall include keys to all points of ingress or egress, whether on the interior or exterior of the building, and keys to locked mechanical rooms, electrical rooms, elevator rooms, fire alarm and sprinkler controls and any area protected by automatic fire detection. Keys to individual residential apartment units are not required.

Ordering responsibility. It shall be the responsibility of the general contractor to order the key box for new buildings. It shall be the responsibility of the owner or tenant to order the key box for existing buildings.

Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted before the installation of a key box. (City Code of Ordinances 46-127)

Knox Box to be mounted 6 feet above ground level

  • 28.All required means of egress shall have an exit discharge consisting of a non-slip surface and leading to and terminating at a public way. NFPA 101
  • 29.All new passenger elevators in a building shall be provided with a car sized to accommodate an ambulance cot 24 inches (609 mm) by 84 inches (2133 mm) in its horizontal open position. Where two or more new passenger elevators are located in a single hoist way and serve all or the same portion of the building, only one elevator car that provides a car sized to accommodate an ambulance cot 24 inches by 84 inches in its horizontal position for each hoist way shall be required. Elevator cars required to comply with 15.1 or 15.2 shall be identified by the international symbol for emergency medical services (star of life). The symbol shall be not less than 3 inches (76 mm) in height and shall be placed inside on both sides of the hoist way door frame. Firefighter recall keys shall be provided in a manner acceptable to the local fire department. (2021 Delaware State Fire Prevention Regulations 705, Chapter 1, 15)
  • 30.Buildings over 25,000 Sq. Ft are to have radio performance testing done prior to Final CO. This must be scheduled in advance with an authorized vendor.
  • 31.Project to be completed per approved Site Plan.
  • 32.Full building and fire plan review is required.
  • 33.Construction or renovations cannot be started until building plans are approved.
  • 34.Fire alarm systems, fire suppression systems, hoods, exhaust ducts, and hood suppression systems require a fire permit from the Fire Marshal’s Office. This work cannot be started until the permit is approved.
  • 35.Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
  • 36.The following is City Ordinance, Appendix B-Zoning, Article 8 Enforcement and Penalties:

Section 1. - Building permits.

No building or structure in any district shall be erected or structurally altered without a building permit duly issued upon application to the building inspector. No building permit shall be issued unless the proposed construction or use is in full conformity with all the provisions of this ordinance. Any building

119

Paj 120

Item 5.

permit issued in violation of the provisions of this ordinance shall be null and void and of no effect, without the necessity for any proceedings for revocations or nullification thereof, and any work undertaken or use established pursuant to any such permit shall be unlawful (see section 4 for penalties).

1.1 No building permit shall be issued for the construction or alteration of any building upon a lot without frontage upon, or legal permanent access to, a public street improved to the satisfaction of the planning commission, or without access to a public sewer.

1.2 No building permit shall be issued for any building where the site development plan of such building is subject to approval by the planning commission, except upon approval of such plans approved by the said commission.

1.21 No building permit shall be issued for any building in a subdivision unless the subdivision plot has been approved by the planning commission.

1.3 No building permit shall be issued for a building to be used for any conditional use in any zone where such use is allowed only with approval of the planning commission, unless and until such approval has been duly granted by the said commission.

(Ord. of 7-12-1993, § 3)

ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:

  • 1.Please confirm that the islands have 14’ clearance as outlined in item # 11 listed above
  • 2.Please add a hydrant at the rear of the building

APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):

2021 NFPA 1 Fire Code (NFPA; National Fire Protection Association) 2021 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association) 2019 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association) 2019 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association) 2009 IBC (International Building Code) Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations 2021 Delaware State Fire Prevention Regulations City of Dover Code of Ordinances

*If you have any questions or need to discuss any of the above comments, please call the above contact person listed.

120

Paj 121

Item 5.

From: Mobley, Will (DelDOT)
To: Melson-Williams, Dawn; Schwartz, Joshua (DelDOT)
Subject: EXTERNAL: DAC Comments 28 Jan 26 Staff Development Meeting
Date: Wednesday, January 28, 2026 5:04:46 PM

WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning,

Here are the comments from DelDOT for the applications discussed in the DAC Committee Meeting.

AX-26-01 Lands of Fuller at 7 Nixon Ln
No objection to annexation.

AX-26-02 Lands of United Worldwide Express, LLC at 1624 North Little Creek Rd and Adjacent Two Parcels No objection to annexation.

Z-26-01 Lands of United Worldwide Express, LLC at 1600 North Little Creek Rd and Adjacent Parcel at 0.509 AC North Little Creek Road No objection to rezoning.

C-26-01 Bay Pointe Apartments (One Building Concept) at 1100 Bay Road This project has an Entrance Plan Approval dated 5-10-23. Plan approval expires 5-10- 26. Plans will need reapproval if no work is started before expiration date.

US-26-01 Dover Industrial Park Comprehensive Signage Plan Ensure planned sign structure is outside of DelDOT Right of Way. At a minimum the sign must be placed outside the clear zone of the state maintained frontage road and must not fall within the sight distance triangle located at the site entrance. Lastly Delaware Code 17 § 1108 Location and condition of advertising regulated. ---(a) Subject to subsection (c) of this section, no outdoor advertising sign, display or device, except a directional, gateway, or warning sign, official sign or notice erected by or with the approval of the Department, shall be erected subsequent to July 14, 1969, within 25 feet of the right-of-way line of any public highway if visible from any portion of the same.

121

Paj 122

Item 5.

Sincerely,
Will T Mobley III, PMP
Division of Economic Development, DELDOT
Interim Kent County Review Coordinator
Phone (302)-760-2409
Will.mobley@delaware.gov

122

Paj 123

KENT CONSERVATION DISTRICT

Item 5.

1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG

CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
FEBRUARY 2026

APPLICATION: Bay Pointe Apartments (One Building Concept) at 1100 Bay Road FILE #: C-26-01 REVIEWING AGENCY: Kent Conservation District CONTACT PERSON: Cullen Baker PHONE: (302) 608 - 5370 EMAIL: stormwater@kentcd.org

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:

Source: 2019 Delaware Sediment and Stormwater Regulations

CITY AND STATE CODE REQUIREMENTS:

  • 1.As the disturbance for this site will exceed 1 acre, a detailed sediment and stormwater management plan must be reviewed and approved by the District prior to any land disturbing activity (i.e. clearing, grubbing, filling, grading, etc.) taking place. The review fee and a completed Application for a Detailed Plan are due at the time of plan submittal to the District’s office.
  • 2.The following notes must appear on the record plan:
  • a.The Kent Conservation District reserves the right to enter private property for purposes of periodic site inspection.
  • b.The Kent Conservation District reserves the right to add, modify, or delete any erosion or sediment control measure, as it deems necessary.
  • c.A clear statement of defined maintenance responsibility for stormwater management facilities must be provided on the Record Plan. ADVISORY COMMENTS TO THE APPLICANT:
  • 1.KCD currently has an approved plan for this project, which is valid until November 4, 2027. KCD also held a pre-construction meeting on May 7, 2024.
  • 2.KCD will require an updated set of sediment and stormwater plans to be submitted for review and re- approval, and a 25% re-approval fee will be required at that time.
  • 3.A letter of no objection to recordation will be provided upon approval of the Sediment and Stormwater Management Plan.

123

Paj 124

Item 5.

CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
ADVISORY BRIEF Planning
D.A.C. MEETING DATE: 2/4/2026 Organization

C-26-01 Bay Pointe Apartments (One Building Concept) at 1100 Bay Road

FILE # C-26-01 REVIEWING AGENCY: Dover/Kent County MPO

CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030

Attached, please find comments submitted by Dover Kent MPO for each of the current City of Dover Development Advisory Committee (DAC) applications. These comments are a part of the MPO’s ongoing goals of promoting transportation safety and connectivity within the region. They are submitted in accordance with the support given by the MPO Council on November 6, 2024.

Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be waived.

City of Dover Planning Commission
Conditional Use Site Plan Review

C-26-01 Bay Pointe Apartments (One Building Concept) at 1100 Bay Road

Dover Kent MPO recommends that the marked crosswalk connecting the eastern and western sides of Bay Road be moved southward, so that it utilizes the existing median as an area of refuge for pedestrians. Bay Road is a minor arterial with an Annual Average Daily Traffic (AADT) of 18,794 and a posted speed limit of 45 mph. Combined with the width of the road and the number of travel lanes, these conditions would make crossing Bay Road dangerous for pedestrians even with a designated crossing area. The crossing is also likely to see frequent use from residents of the new apartments. Considering that not all pedestrians will be able to cross the full length of the road within the provided time, a pedestrian refuge would be a valuable safety improvement in this location. This change to the entrance would set an example for pedestrian crossings on multi-lane roads in Dover, as there are many locations in the city with similar existing conditions. The applicant is encouraged to speak to DelDOT and Dover Kent MPO about this possibility.

The other elements of the plan address most of the issues Dover Kent MPO looks for in site plans. These elements include internal sidewalks, a shared use path along the property’s frontage,

124

Paj 125

Item 5.

crosswalks at key locations, curb ramps, accessible parking spaces near the main entrance, bicycle parking, and a circular route around the building for trash collection and first responders. The applicant should ensure that all of these improvements follow the accessibility requirements of the City of Dover, DelDOT, and the Americans with Disabilities Act (ADA).

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.

125

Paj 126

Item 5.

City of Dover
DATA SHEET FOR RECREATION PLAN REVIEW
Review of Active Recreation Area Plan

PARKS, RECREATION AND COMMUNITY ENHANCEMENT COMMITTEE

MEETING OF February 10, 2026
PLANNING COMMISSION MEETING of February 17, 2026

Plan Title: Bay Pointe Apartments (One Building Concept)

Plan Type: Active Recreation Area
Associated with Conditional Use Site Plan C-26-01

Location: Southwest side of Bay Road at Lafferty Lane

Address: 1100 Bay Road

Tax Parcels: ED-05-086.00-01-20.00-000

Owner/Applicant: Patel Hospitality Properties

Site Area: 3.302 +/- acres

Zoning: C-4 (Highway Commercial Zone)

Prior Use: vacant, vegetated/wooded areas

Proposed Use: One Apartment Building with associated site improvements

Dwelling Units: 54 units

Parking: Required: 122 parking spaces
Proposed: 131 parking spaces

Water: City of Dover
Sanitary Sewer: Kent County Department of Public Works

For Consideration
Recreation Area: Active Recreation Area Plan
Required – 10,000 SF
Provided – 13,390 SF

  • P.O. Box 475 Dover, DE 19903 126 Community Excellence Through Quality Service

Paj 127

Item 5. C-26-01: Bay Pointe Apartments Active Recreation Area Review Report to Parks, Recreation & Community Enhancement Committee – February 10, 2026

  • I.PROJECT SUMMARY: This Application C-26-01 is for review of a Conditional Use Site Plan to permit the construction of a Multiple Family Dwelling Unit (Apartment) Building, a three-story (59,313 SF Gross Floor Area) building with 54 apartment units (16 two-bedroom, 38 one-bedroom), and associated site improvements. The property is zoned C-4 (Highway Commercial Zone) which requires approval of a Conditional Use Application for the proposed Apartment Building. The associated site improvements include a parking lot, multi-use path along the frontage of Bay Road and sidewalk connections from the parking lot to the building and from the multi-use path to the parking area. This project also includes landscaping along the Bay Road frontage and around and throughout the parking area.

Previous Application This Apartment Building Plan was previously reviewed and approved as C-21-04 Bay Pointe Apartments in May 2021 by Planning Commission with Final Plan Approval in June 2023. That plan expired, and the applicant has submitted this new Application C-26-01 which replicates what was previously approved.

II. ACTIVE RECREATION AREA PLAN SUMMARY:

According to Article 5 §10.514 Residential developments of ten (10) or fewer acres with a density over six units per acre shall be required to provide 150 square feet of Active Recreation Area per dwelling unit or 10,000 square feet of active recreation area, whichever is greater. With this project of fifty-four (54) units, the Active Recreation Area requirement calculates to 8,100 SF which is less than 10,000 SF thus requiring the greater amount. The property is 3.302 acres; therefore, density is 16.3 dwelling units per acre.

The following table depicts the calculation of Active Recreation Area required and a summary of the amenities:

Required Provided on Plan Active Recreation 150 S.F. per dwelling unit or • 13,390 SF Area (Article 5 10,000 SF whichever is greater • 248 SF +/- per dwelling §10.514) to be provided on site. unit Amenities: 54 DU = 8,100 SF • Picnic Pavilion/Gazebo Required = 10,000 SF • Picnic Tables (5) • Outdoor Fitness Stations Provided: 13,390 SF • Sand Volleyball Court • Canoe/Kayak Storage Other Site Improvements: • Access to sidewalk system and multi-use path • Covered Bicycle Parking rack (outdoor)

The Plans submitted include an Active Recreation Area Plan Sheet (Sheet CS1002; included as exhibit). This plan shows the extent of the planned Active Recreation Facilities on site. Located to the north of the main building and connected to the building and the multi-use path (along Bay 127

Paj 128

Item 5. C-26-01: Bay Pointe Apartments Active Recreation Area Review Report to Parks, Recreation & Community Enhancement Committee – February 10, 2026

Road frontage) via a sidewalk, the Active Recreation Area is noted as being 13,309 SF +/- in area. It is to be comprised of a picnic area with associated gazebo and picnic tables, an area dedicated to outdoor fitness equipment, a storage facility for kayaks, and a designated sand volleyball court. These features are proposed in addition to the bicycle parking facilities (for minimum 7 bicycles), a sidewalk around the perimeter of the Apartment Building, and a connection to the multi-use path along Bay Road.

III. REVIEW PROCESS

The Planning Office has prepared this Active Recreation Area Report outlining the facilities proposed by the Applicant to meet the Active Recreation Area requirements. The Parks, Recreation and Community Enhancement Committee will need to consider the proposed Active Recreation Area proposal and make a recommendation. The Planning Commission must act to accept the proposed Recreation Area Plan as part of its review of the Conditional Use Site Plan.

The Parks, Recreation and Community Enhancement Committee will review the proposed Active Recreation Area facilities for Bay Pointe Apartments (C-26-01) at their meeting on February 10, 2026. The Planning Commission Public Hearing and Review of the Conditional Use Site Plan C-26-01 is set for February 17, 2026.

IV. CODE CITATIONS:

Dover Code of Ordinances, Appendix B – Zoning, Article 5 – Supplementary Regulations, Section 10 – Open Space, Recreation and Other Public Facilities (select excerpts).

Article 5 Section 10 Section 10. - Open space, recreation and other public facilities. The City of Dover shall require the reservation of open space, recreation and other public facilities in accordance with the provisions of this section as a condition of approval for all one-family dwelling, two- family dwelling and multiple-family dwelling residential developments requiring conditional use approval, site development plan approval, or land subdivision approval by the City of Dover Planning Commission.

10.1 Recreation areas. 10.11 Purpose. The purpose of this section is to ensure that active recreation areas are provided as an integral design element within residential developments and that such facilities are of an adequate scale in relation to the size of the residential development and which provide residents with a variety of active recreational pursuits.

10.12 Dedication required. The commission shall require the dedication or reservation of recreation areas, and the subsequent construction of recreation facilities of a character, extent and location suitable to the needs created by a development for recreation facilities as defined and in accordance with the design guidelines set forth.

10.13 Definition. The following are illustrative of the types of recreation areas and subsequent facilities that shall be deemed to serve active recreational needs and therefore to count toward satisfaction of the recreation area requirements of this section: tennis courts, handball courts, racquetball courts, swimming pools, saunas and exercise rooms, meeting or activity rooms within clubhouses, baseball and soccer fields, basketball courts, volleyball courts, swings, slides and play apparatus, and developed walking, jogging or biking trails.

10.14 Recreation area review…

128

Paj 129

Item 5. C-26-01: Bay Pointe Apartments Active Recreation Area Review Report to Parks, Recreation & Community Enhancement Committee – February 10, 2026

10.15 Design guidelines. 10.151 Accessible. Recreation areas shall be accessible within the development and arranged in a manner which affords reasonable access to all residents within the development. When warranted, recreation areas can be dispersed throughout the development, provided that each remote location is accessible.

10.152 Pedestrian oriented. Recreation areas shall be pedestrian oriented and designed with linkages to existing and planned public walkways and with other existing or planned recreation areas.

10.153 Age oriented. The nature and scope of planned recreation areas shall reflect an awareness of, and sensitivity toward, the anticipated age groups that would reside within the proposed development.

10.154 Parking. Designs consider the need for parking facilities associated with recreation areas.

10.155 Walking, jogging and biking trails. Recreation trails shall only be counted toward the recreation area requirement when constructed as an accessory to central recreation facilities. The developed trail shall be the only area counted toward the area requirement.

10.156 Setbacks. No structure, equipment or game court surface required under this section shall be located nearer than 30 feet to any lot line of a lot to be used for residential purposes, nor nearer than 25 feet from any right-of-way line.

10.157 Landscaping. Such uses shall be landscaped in accordance with provisions of article 5, section 15, and where warranted, visual screening of parking areas, game courts, playground areas and other features as necessary to preserve and protect the interests of adjoining residential properties may be required.

10.158 Area. The minimum area of a remote recreation area shall be 2,000 square feet.

10.16 Area required. All residential developments shall provide recreational areas in a size equal to 275 square feet per dwelling unit or one-half acre of land, whichever is greater. In no case shall the commission require that more than ten percent of the gross area of the development be so dedicated or reserved when the gross area is greater than five acres.

10.17 Cash in lieu of recreation area construction…

10.5 Exemption to recreation area and open space dedication. 10.51 Exemptions for small developments. 10.514 Residential developments of ten (10) or fewer acres with a density over six units per acre. These developments shall be exempt from the area requirements set forth in section 10.16, but shall be required to provide 150 square feet of active recreation area per dwelling unit or 10,000 square feet of active recreation area, whichever is greater. If the commission determines that the construction of some or all of the required active recreation area is not practical or desirable, the commission shall require a cash in lieu donation for the active recreation area determined as not practical or desirable. Cash-in- lieu amount shall be in accordance with subsection 10.173 of this article.

10.7 Council approval. Prior to acceptance by the planning commission, all areas planned for public dedication, or cash donations provided under this section must be submitted to, and approved by the

129

Paj 130

Item 5. C-26-01: Bay Pointe Apartments Active Recreation Area Review Report to Parks, Recreation & Community Enhancement Committee – February 10, 2026

parks, recreation, and community enhancement committee of the City of Dover, and shall be subject to final review and approval by [the] city council.

  • V.STAFF RECOMMENDATIONS Planning Staff recommends approval of the proposed Active Recreation Area for Conditional Use Site Plan Application C-26-01 Bay Pointe Apartments. The following are comments and recommendations from the Planning Office following review of the Active Recreation Area Plan.
  • 1)Active Recreation Area: As a residential development, there is a requirement for Active Recreation Area. The Plans submitted note an area of 13,390 SF to the north of the building specifically designated as “Active Recreation Area.” The features of this Active Recreation Area identified include: a Gazebo and picnic area with picnic tables and seating; a covered Kayak Storage Facility; an Outdoor Fitness Station; and a Sand Volleyball court. Staff supports the proposed Site Improvements proposed to meet the qualifications of an Active Recreation Area.
  • 2)Recreation Areas: Staff recommends approval and further recommends the following regarding improving functionality and accessibility of the Active Recreation Area for the potential residents.
  • a.Accessibility:
  • i.Implement accessible sidewalks connecting from the main building, across the parking lot (including any and all required crosswalk striping, and accessible ramps on all sidewalks) to the Active Recreation Area. ii. The gazebo itself should be accessible with no steps required in order to enter. This can be achieved using site grading. iii. At least one picnic table should have access to it provided via a sidewalk and at least one (1) accessible space for seating.
  • b.General:
  • i.Clarify if gazebo will have interior seating.

VI. ADVISORY COMMENTS

  • 1)The Conditional Use Site Plan set depicting any Recreation Areas is to include appropriate improvements, plans, and details of the Recreation Area as approved.
  • 2)There shall be provisions which ensure that any proposed Active Recreation Areas shall continue as such and be properly managed and maintained. The developer shall either retain ownership and responsibility for maintenance of the common use areas or provide for and establish one (1) or more organizations for the ownership and maintenance of all common space i.e. a Homeowners Association or other property management entity. The organization shall be responsible for maintenance, insurance and taxes on the recreation areas.
  • 3)In the event, that major changes and revisions to the Plan occur in the finalization of the Plan, contact the Planning Office. Examples include reorientation of building, relocation of site components, changes in floor area or unit count, or design revisions impacting Active 130

Paj 131

Item 5. C-26-01: Bay Pointe Apartments Active Recreation Area Review Report to Parks, Recreation & Community Enhancement Committee – February 10, 2026

Recreation Areas. These changes may require resubmission for review by the Development Advisory Committee, Planning Commission, or other agencies and commissions making recommendations in regard to the plan.

  • 4)The Parks, Recreation, and Community Enhancement Committee shall submit to the Planning Commission a report detailing the recommendations as to the Active Recreation Area requirements.

Attachments: • Excerpts from Site Plan set C-26-01 Bay Pointe Apartments: Site Improvement Plan Sheet (CS1001), Active Recreation Plan Sheet (CS1002) and Landscape Plan Sheet (CS2001)

Note: This review Report was initially prepared by Staff of the Rossi Group (under a Planning Services contract with the City of Dover. The Report was completed with additional review and editing by the City’s Planning Office.

131

Paj 132

Item 5.

GENERAL SITE CONSTRUCTION SPECIFICATIONS BITUMINOUS PAVING LEGEND

BAY POINTE APARTMENTS GENERAL

  • 1.THE CONTRACTOR SHALL CONSULT THESE SECTIONS IN DETAIL, AS HE WILL BE RESPONSIBLE FOR WORK INDICATED AND EXISTING BUILDING GOVERNED BY CONDITIONS SET FORTH THERE IN. RIGHT-OF-WAY / PROPERTY LINE QUALITY ASSURANCE CURB
  • 1.PERFORM WORK IN ACCORDANCE WITH APPLICABLE DELAWARE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. SIDEWALK

CIVIL CONSTRUCTION PLANS 2. MIXING PLANT: DELAWARE DEPARTMENT OF TRANSPORTATION APPROVED FACILITY. PAVEMENT

  • 3.OBTAIN MATERIALS FROM SAME SOURCE THROUGHOUT. SIGN UTILITY POLE AND LIGHT ENVIRONMENTAL REQUIREMENTS FH HYDRANT
  • 1.DO NOT PLACE BITUMINOUS WHEN AMBIENT AIR OR COARSE STONE BASE COURSE SURFACE TEMPERATURE IS LESS THAN 40 DEGREES F, NOR WHEN SURFACE IS WET OR FROZEN. 5 MAJOR CONTOUR

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR MATERIALS 4 MINOR CONTOUR 1. BINDER COURSE: DELDOT TYPE B WATER LINE

CITY OF DOVER, EAST DOVER HUNDRED, KENT COUNTY, DELAWARE 2. WEARING COURSE: DELDOT TYPE C UNDERGROUND GAS LINE

  • 3.TACK COAT: EMULSIFIED ASPHALT UNDERGROUND STEAM LINE SANITARY SEWER

AND OWNER MUST BE NOTIFIED OF ANY INITIAL ISSUED: JULY 14, 2021 4. FORMS: WOOD FORM MATERIAL, PROFILED TO SUIT CONDITIONS. DRAINAGE SEWER 5. PAVEMENT MARKINGS IN ACCORDANCE WITH DELAWARE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. OVERHEAD ELECTRIC LINE

LAST REVISED: MARCH 14, 2023 EXECUTION UNDERGROUND ELECTRIC LINE 1. VERIFY THAT COMPACTED SUBBASE IS DRY AND READY TO SUPPORT PAVING AND IMPOSED LOADS, SEE STRUCTURAL FILL SECTION. UNDERGROUND TELECOMM LINE

DISCREPANCIES BEFORE PROCEEDING WITH WORK 2. VERIFY GRADIENTS AND ELEVATIONS OF BASE ARE CORRECT. UNDERGROUND COMMUNICATIONS LINE

  • 3.APPLY TACK COAT TO VERTICAL CONTACT SURFACES OF EXISTING CURBS, PAVEMENTS, AND STRUCTURES. PREPARED FOR: MANHOLES
  • 4.COAT SURFACES OF MANHOLE OR INLET FRAMES WITH OIL TO PREVENT BOND WITH BITUMINOUS CONCRETE PAVEMENT. DO

5.
NOT TACK COAT THESE SURFACES.

PLACE BITUMINOUS MIXTURE WHEN TEMPERATURE IS NOT MORE THAN 15 F DEGREES FROM THE TEMPERATURE OF THE OWNER/DEVELOPER VALVES

PATEL HOSPITALITY PROPERTIES COMPLETED MIXTURE AT THE PLANT. INLET

  • 6.PLACE WEARING COURSE WITHIN TWO HOURS OF PLACING AND COMPACTING BINDER COURSE. IF NOT PLACED WITHIN TWO TREE HOURS, APPLY TACK COAT OVER BINDER COURSE TO ASSURE ADHESION. PROPOSED BUILDING
  • 7.COMPACT PAVEMENT BY ROLLING WITH MINIMUM 10 TON ROLLER. DO NOT DISPLACE OR EXTRUDE PAVEMENT FROM POSITION. HAND COMPACT IN AREAS INACCESSIBLE TO ROLLING EQUIPMENT WITH HOT IRON TAMPERS, WEIGHING NOT LESS THAN 25 LBS. PROPOSED PROPERTY LINE
  • 8.PERFORM ROLLING WITH CONSECUTIVE PASSES TO ACHIEVE EVEN AND SMOOTH FINISH, WITHOUT ROLLER MARKS. 3171 DUPONT PARKWAY PROPOSED CONCRETE CURB

PROPOSED HEAVY DUTY CONCRETE 9. LONGITUDINAL JOINT IN ONE LAYER SHALL OFFSET THE PREVIOUS JOINT IN THE LAYER IMMEDIATELY BELOW BY

TOWNSEND, DELAWARE 19734

APPROXIMATELY 6 INCHES. WHERE ABUTTING PAVING IS NOT PLACED THE SAME DAY OR THE ABUTTING JOINT IS DISTORTED, PROPOSED LIGHT DUTY CONCRETE THE JOINT SHALL BE TRIMMED TO A TRUE SURFACE AND PAINTED WITH A TACK COAT. PROPOSED HEAVY DUTY ASPHALT 10. TRANSVERSE JOINTS SHALL BE STRAIGHT-EDGED TO ASSURE SMOOTHNESS, AND THE JOINT FACE SHALL BE PAINTED WITH A

---- TACK COAT. CROSS ROLL, TO OBTAIN THOROUGH COMPACTION OF JOINT. PROPOSED LIGHT DUTY ASPHALT

BAY POINTE APARTMENTS PATEL HOSPITALITY PROPERTIES 11. IMMEDIATELY AFTER PLACEMENT, PROTECT PAVEMENT FROM MECHANICAL INJURY UNTIL ADEQUATE STABILITY AND ADHESION

APPLICATION # C-21-04 HAVE BEEN OBTAINED AND THE MATERIAL HAS COOLED SUFFICIENTLY TO PREVENT DISTORTION OR LOSS OF FINES. 5 PROPOSED MAJOR CONTOUR

  • 12.NO VEHICULAR TRAFFIC SHALL BE PERMITTED ON THE NEW SURFACE IN LESS THAN SIX (6) HOURS AFTER THE SURFACE HAS 4 PROPOSED MINOR CONTOUR

BAY ROAD BEEN FINISHED.

3171 DUPONT PARKWAY

COVER SHEET W PROPOSED WATER SERVICE

PAVEMENT MARKINGS S PROPOSED SANITARY SEWER

UC PROPOSED COMMUNICATIONS LINE GENERAL UE PROPOSED ELECTRIC LINE 1. THE CONTRACTOR SHALL CONSULT THESE SECTIONS IN DETAIL, AS HE WILL BE RESPONSIBLE FOR WORK INDICATED AND

CITY OF DOVER, DLEAWARE 19901 GOVERNED BY CONDITIONS SET FORTH THERE IN.

TOWNSEND, DELAWARE 19734 UG PROPOSED GAS LINE

  • 2.THIS WORK SHALL CONSIST OF FURNISHING AND INSTALLING OF PAVEMENT MARKINGS TO VARIOUS SURFACES AT LOCATIONS AND PATTERNS AS SPECIFIED IN THE CONTRACT DOCUMENTS OR AS DIRECTED BY THE ENGINEER/ARCHITECT. THIS INCLUDES DURABLE AND NONDURABLE LINE MARKINGS (STRIPING), LEGENDS (LETTERS AND NUMBERS), AND SYMBOLS.

MATERIALS

  • 1.MATERIALS SHALL MEET THE REQUIREMENTS OF THE DELAWARE DEPT. OF TRANSPORTATION AND AS INDICATED ON THE DRAWINGS. NORTH NORTH

EXECUTION

  • 1.INSTALLATION SHALL BE IN ACCORDANCE WITH THE DELAWARE DEPT. OF TRANSPORTATION AND AS INDICATED ON THE DRAWINGS. SITE SITE Sheet List Table
  • 2.MAINTAIN THE STRIPING AND PAVEMENT MARKINGS, EXISTING OR CONSTRUCTED BY THIS CONTRACTOR, IN “LIKE NEW” Sheet Number Sheet Title CONDITION FOR THE DURATION OF THE CONTRACT. REPAIR OR REPLACE UNSUITABLE PAVEMENT MARKINGS WITH NEW PAVEMENT MARKINGS MEETING THE REQUIREMENTS OF THIS SPECIFICATION. 1 COVER SHEET 2 EXISTING CONDITIONS AND DEMOLITION PLAN EARTHWORK 3 SITE IMPROVEMENT PLAN QUALITY INSURANCE 4 ACTIVE RECREATION PLAN
  • 1.FILLS SHOULD BE PLACED IN LAYERS NOT EXCEEDING 8 INCHES COMPACTED MEASURE. THIS CRITERION MIGHT BE ADJUSTED 5 GRADING PLAN BY THE GEOTECHNICAL ENGINEER IN THE FILED DEPENDING ON THE CONDITIONS PRESENT AT THE TIME OF CONSTRUCTION, ON THE COMPACTION EQUIPMENT USED, AND ON FILL MATERIAL SELECTED. FILLS FOR SUPPORT OF PAVEMENTS SHOULD BE 6 UTILITY PLAN COMPACTED TO AT LEAST 95 PERCENT OF THE LABORATORY DETERMINED DRY DENSITY, ASTM D-698, WHEN SMALL, ALS BRD BRD GBR BY 7 LANDSCAPE PLAN

PROJECT STATUS: ---- HAND-OPERATED COMPACTION EQUIPMENT US USED, AND TO AT LEAST 95 PERCENT OF THE LABORATORY DETERMINED DRY DENSITY, ASTM D-1557, WHEN SELF-PROPELLED, HEAVY DUTY CONSTRUCTION EQUIPMENT IS USED.

8LIGHTING PLAN
2. UNDER PAVEMENTS, PREPARED SUBGRADES SHOULD BE THOROUGHLY PROOF ROLLED USING A MINIMUM 10-TON VIBRATORY
ROLLER OPERATED IN STATIC MODE OR A FULLY LOADED DUMP TRUCK IN AN ATTEMPT TO IDENTIFY UNSTABLE (SOFT, YIELDING, 9 UTILITY PROFILES
ETC.) SURFACE AREAS. DURING PROOFROLLING ANY UNSTABLE AREA FOUND SHOULD BE STABILIZED BY EXCAVATING AND
REPLACING THOSE SOILS WITH SUITABLE SOILS.10UTILITY PROFILES
11SITE DETAILS

PLOTSTYLE:Pennoni NCS.stb 3. A QUALIFIED GEOTECHNICAL ENGINEER OR TECHNICIAN, PAID FOR BY THE OWNER, SHALL MONITOR ALL SITE PREPARING,

PER DAC COMMENTS - CHECK PRINTS

GRADING, AND FILL CONSTRUCTION. THE ENGINEER/ TECHNICIAN SHOULD OBSERVE AND DOCUMENT THE SITE PREPARATION, 12 SANITARY SEWER DETAILS EXISTING FILL MATERIAL REMOVAL, AND FILL/BACKFILL CONSTRUCTION WORK, AND MAKE APPROPRIATE FILED TESTS, AS NECESSARY, TO VERIFY THAT ACCEPTABLE FILL MATERIALS ARE BEING USED AND THAT CONSTRUCTION IS BEING PERFORMED 13 WATER DETAILS IN ACCORDANCE WITH APPLICABLE PLANS, SPECIFICATIONS AND ACCEPTABLE CONSTRUCTION PRACTICES.

REVISIONS 14 STORM SEWER DETAILS

REVISED PER COD PW STRUCTURAL BACKFILL

REVISED PER KC PW 1. STRUCTURAL FILL SHOULD BE INCLUDED IN THE CONTRACT DOCUMENTS. GRANULAR FILL SHOULD CONSIST OF WELL-GRADED MATERIAL WITH MAXIMUM PARTICLE SIZE LESS THAN 3 INCHES, MOT MORE THAN 20 PERCENT PASSING THE NO. 200 SIEVE AND LOCATION MAP LOCATION MAP FINAL PLANS

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS0001.dwg PLOTTED:5/24/2023 4:42 , PMBY:Andrew Shields HAVE A PLASTICITY INDEX (PI) NOT GREATER THAN 8 PERCENT.

  • 2.IMPORTED STRUCTURAL FILL SHOULD BE APPROVED AND SAMPLED BY TESTING AGENCY PRIOR BACKFILL OPERATIONS. Scale: 1" = 400' Scale: 1" = 1200'
  • 3.UNIFORMLY MOISTEN OR AERATE SUBGRADE AND EACH SUBSEQUENT FILL OR BACKFILL SOIL LAYER BEFORE COMPACTION TO CALL BEFORE YOU DIG WITHIN 3 PERCENT OF OPTIMUM MOISTURE CONTENT Call Miss Utility of Delmarva . NO. 800-282-8555 4 3 2 1
  • 4.DO NOT PLACE BACKFILL OR FILL SOIL MATERIAL ON SURFACES THAT ARE MUDDY, FROZEN, OR CONTAIN FROST OR ICE. Ticket Number(s):

2023-03-14
FIELD QUALITY CONTROL

02/17/22 02/11/22
PREPARED BY: 9/24/21 DATE

PENNONI ASSOCIATES INC. 1. TESTING AGENCY TO INSPECT AND TEST SUBGRADES AND EACH FILL OR BACKFILL LAYER. PROCEED WITH SUBSEQUENT EARTHWORK ONLY AFTER TEST RESULTS FOR PREVIOUSLY COMPLETED WORK COMPLIES WITH REQUIREMENTS. ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES 2. TESTING AGENCY WILL TEST COMPACTION OF SOILS IN PLACE ACCORDING TO ASTM D 1556, ASTM D2167, ASTM D 2922, AND ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE ASTM D 2937, AS APPLICABLE. PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON 3. TEST PAVED AREA SUBGRADES AND AT EACH COMPACTED FILL AND BACKFILL LAYER, AT LEAST 1 TEST FOR EVERY 2000 THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

Christiana Executive Campus PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION SQUARE FEET, BUT NO FEWER THAN 3 TESTS. OWNER'S CERTIFICATION: OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS I, THE UNDERSIGNED, HEREBY CERTIFY THAT I AM THE AUTHORIZED AGENT OF THE OWNER OF THE PROPERTY 4. WHEN TESTING AGENCY REPORTS SUBGRADE, FILLS, OR BACKFILLS HAVE NOT ACHIEVED DEGREE OF COMPACTION SPECIFIED, SOLE RISK AND WITHOUT LIABILITY OR LEGAL SCARIFY AND MOISTEN OR AERATE, OR REMOVE AND REPLACE SOIL TO DEPTH REQUIRED; RECOMPACT AND RETEST UNTIL SPECIFIED COMPACTION IS OBTAINED. 121 Continental Drive, Suite 207 DESCRIBED AND SHOWN ON THIS PLAN, THAT THE PLAN WAS MADE AT MY DIRECTION, AND THAT I ACKNOWLEDGE THE SAME TO ME BY ACT AND DESIRE THE PLAN TO BE DEVELOPED AS SHOWN IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS. EXPOSURE TO PENNONI ASSOCIATE; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES

DEWATERING Newark, DE 19713-4310 ARISING OUT OF OR RESULTING THEREFROM.

PLAWX21003 T 302.655.4451 PROJECT 1. PREVENT SURFACE WATER AND GROUND WATER FROM ENTERING EXCAVATIONS, FROM PONDING ON PREPARED SUBGRADES, DOMINIC J. BALASCIO DATE AND FROM FLOODING PROJECT SITE AND SURROUNDING AREAS. THE BIDDER IS RESPONSIBLE FOR COMPLETE DEWATERING PATEL HOSPITALITY PROPERTIES

F 302.654.2895 DATE 2021-07-14

FOR ALL SITE WORK INCLUDING STORMWATER MANAGEMENT AND EROSION CONTROL FACILITIES. ALL DEWATERING METHODS 3171 DUPONT PARKWAY MUST BE APPROVED BY DNREC AND MUST BE PER THE DNREC ESC HANDBOOK, LATEST VERSION EFFECTIVE FEBRUARY, 2019. TOWNSEND, DELAWARE 19734 DRAWING SCALE 1"=30' 2. PROTECT SUBGRADES FROM SOFTENING, UNDERMINING, WASHOUT, AND DAMAGE BY RAIN AND EATER ACCUMULATION. PROFESSIONAL CERTIFICATION: REROUTE SURFACE WATER RUNOFF AWAY FROM EXCAVATED AREAS. DO NOT ALLOW WATER TO ACCUMULATE IN I, THE UNDERSIGNED, HEREBY CERTIFY THAT I AM A REGISTERED ENGINEER IN THE STATE OF DELAWARE, THAT THE EXCAVATIONS. WHERE PONDING DOES OCCUR, THE WATER SHOULD BE PUMPED IMMEDIATELY, AND GRADES SHOULD THEN BE INFORMATION SHOWN HERON HAS BEEN PREPARED UNDER MY SUPERVISION AND THE THE BEST OF MY KNOWLEDGE DRAWN BY SRA ESTABLISHED TO PREVENT FURTHER PONDING. AND BELIEF REPRESENTS GOOD ENGINEERING PRACTICES AS REQUIRED BY THE APPLICABLE LAWS OF THE STATE OF DELAWARE. APPROVED BY GBR

STEVEN ANDERSON JR., PE (DE PE# 13187) PENNONI ASSOCIATES INC. 121 CONTINENTAL DRIVE, SUITE 207

DATECS0001
NEWARK, DE 19713-4310PHONE: (302) 351-5227FAX: (302) 654-2895SHEET1OF 14
132

Paj 133

Item 5.

PENNONI ASSOCIATES INC.

39EXISTING HW
INV IN 30.38NOTES:
1. THE SUBJECT PROPERTIES ARE REFERENCED AS TAX MAP:

Christiana Executive Campus

NO2-05-08600-01-1800-00001 (LOT 1)
RTH
382-05-08600-01-1900-00001 (LOT 2)
2-05-08600-01-2000-00001 (LOT 3)
50

121 Continental Drive, Suite 207 31 45 2. TOPOGRAPHIC INFORMATION WAS TAKEN FROM FIELD SURVEYS BY PENNONI 40 TH L ASSOCIATES, INC PERFORMED IN OCTOBER 2020 AND SUPPLEMENTED IN AUGUST 32 E S AND 35 2021. TA S (Ri TE O N/F O N 27°50'06 33 "W ght F D F -of- Wa ELAW (OT RO 3. MISS UTILITY SHALL BE NOTIFIED THREE (3) CONSECUTIVE WORKING DAYS PRIOR Newark, DE 19713-4310 154.02' y) AR HE RE UT TO EXCAVATION, AT 1-800-282-8555.

E1
34 E XP

T 302.655.4451 F 302.654.2895

35RE4.ALL SIGNING FOR MAINTENANCE OF TRAFFIC IS THE CONTRACTORS
SS RESPONSIBILITY, AND SHALL FOLLOW THE GUIDELINES SHOWN IN LATEST EDITION
36WAY
EDS&OF "DELAWARE TRAFFIC CONTROLS FOR STREETS AND HIGHWAY CONSTRUCTION,
GE
OFFRMAINTENANCE, UTILITY, AND EMERGENCY OPERATIONS."
PAEE
LANDS N/F OFVINWA
N0Y)5.UNLESS SPECIFICALLY STATED OR SHOWN HEREON TO THE CONTRARY, THIS
38THE STATE OF DELAWARE1°4G
3SURVEY IS MADE SUBJECT TO AND DOES NOT LOCATE OR DELINEATE:
(Right-of-way)233 '39" E
Zoning N/A.19

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR ' "W 5.1. RIGHTS OR INTEREST OF THE UNITED STATES OF AMERICA OR STATE OF 3' 0 ' DELAWARE OVER LANDS NOW OR FORMERLY FLOWED BY TIDEWATER, BUT NO 9 °5 .98 LONGER VISIBLE OR PHYSICALLY EVIDENT, OR LANDS CONTAINING ANY ANIMAL, 69 14 MARINE OR BOTANICAL SPECIES REGULATED BY OR UNDER THE JURISDICTION N 1 OR ANY FEDERAL, STATE, OR LOCAL AGENCY.

37 5.2. BUILDING SETBACK LINES, ZONING REGULATIONS OR LINES ESTABLISHED BY ANY FEDERAL, STATE OR LOCAL AGENCY WHICH MAY AFFECT THE BUILDING OR DEVELOPMENT POTENTIAL OF THE SUBJECT PROPERTY.

AND OWNER MUST BE NOTIFIED OF ANY 36

5.3.ANY SUBSURFACE OR SUBTERRANEAN CONDITION, EASEMENTS OR RIGHTS,
33INCLUDING, BUT NOT LIMITED TO MINERAL OR MINING RIGHTS, OR THE
35LOCATION OF OR RIGHTS TO ANY SUBSURFACE STRUCTURES, CONTAINERS OR
FACILITIES OR ANY OTHER NATURAL OR MAN-MADE SUBSURFACE CONDITION
WHICH MAY OR MAY NOT AFFECT THE USE OR DEVELOPMENT POTENTIAL OF
THE SUBJECT PROPERTY.
  • 6.UTILITY NOTES:

DISCREPANCIES BEFORE PROCEEDING WITH WORK

336.1.THE LOCATION OF THE EXISTING UNDERGROUND UTILITIES SHOWN ON THIS
130.00'64.93'PLAN HAVE BEEN TAKEN FROM EXISTING UTILITY RECORDS AVAILABLE AT THE
S 21°36'00" ES 21°36'00" ETIME THESE PLANS WERE PREPARED AND FROM SURFACE OBSERVATION OF
THE SITE. LOCATIONS OF UTILITIES AS SHOWN AND MAY OR MAY NOT BE
3534
COMPLETE. THE NATURE AND EXACT LOCATION OF EXISTING UTILITIES SHOULD
34BE VERIFIED PRIOR TO INITIATING ANY ACTIVITY THAT MAY AFFECT THEIR USE
OR LOCATION.

TH 6.2. COMPLETENESS OR ACCURACY OF LOCATION AND DEPTH OF UNDERGROUND F W E UTILITIES AND STRUCTURES IS NOT GUARANTEED. O LA 35 /F E y) N D a S F -W D O f 6.3. THE CONTRACTORS SHALL VERIFY LOCATIONS AND DEPTHS OF ALL

EXISTING CONDITIONS AND DEMOLITION PLAN

N N TE t-o UNDERGROUND UTILITIES AND STRUCTURES BEFORE THE START OF WORK. " E LA TA igh 17 0' 0' S (R °4 .3 6.4. IF CONFLICTS ARE FOUND THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE 35 A

194.56'
13 06
3

REOWNER AND DESIGN ENGINEER FOR INSTRUCTION BEFORE PROCEEDING WITH
WORK.
36LANDS N/F OFLANDS N/F OF

S 64°54'06" W PATEL HOSPITALITY PROPERTIES 36 PATEL HOSPITALITY PROPERTIES 7. THIS SITE IS ZONED C-4 (HIGHWAY COMMERCIAL) 2-05-08600-01-1900-00001 2-05-08600-01-1800-00001 LANDS N/F OF (LOT 2) (LOT 1) PATEL HOSPITALITY PROPERTIES 36 8. NO WETLANDS ARE FOUND ON-SITE PER EVALUATION BY PENNONI ASSOCIATES INC. 2-05-08600-01-2000-00001 N 69°02'40" E N 68°24'00" E 165.11' EX. VEGETATION (LOT 3)

BAY POINTE APARTMENTS TO BE REMOVED.

PATEL HOSPITALITY PROPERTIES 36

165.12' 165.11' S 68°24'00" W
37
LOT LINES TO BE

BAY ROAD EXTINGUISHED (TYP.) 36

3171 DUPONT PARKWAY
37 EX. PAVEMENT 37
TO BE REMOVED.
38

MACADAM 37

CITY OF DOVER, DLEAWARE 19901
TOWNSEND, DELAWARE 19734
PAVING
N 68°23'57" E
EX. SIGN TO BE
REMOVED. (TYP.)

27.68'
EX. STORM SEWER EX. STORM SEWER
TO BE REMOVED. TO BE REMOVED.
116.00' 131.86' 64.93' 369.00'
S 21°35'59" E S 21°36'00" E S 21°36'00" E S 21°36'00" E

MAC PVNG MAC PVNG "NO STOPPING "NO STOPPING "NO STOPPING

MAC PVNG

STANDING ORSTANDING OR
"DO NOTSTANDING ORPARKING"
GRASS3636PARKING""ONE WAY"ENTER"GRASSPARKING"
37GRASS37"WRONG WAY"EDGE OF PAVING
37
38BENCHMARK
EOP38EOP
3838
37.47 (PK NAIL)EDGE OF TRAVEL LANE (WHITE STRIPE)
KCSDD #24
3898 LF 12" CMPRIM 37.51
INV. IN 35.4INV. IN 24.82 (12.69 FT DEEP)
INV. OUT 35.2
INV. OUT 24.64 (12.87 FT DEEP)

STOP BAR
8" PVC SEWER @ 0.003 FT/FT 8" PVC SEWER @ 0.003 FT/FT
APPROXIMATE LOCATION DO NOT ENTER SIGN
APPROXIMATE LOCATION
72 LF 12" CMP

BAY ROAD

EOPINV. IN 35.5EOP
EX. 4" STEEL GAS MAIN,"TURN LANE"
INV. OUT 35.3APPROXIMATE 42" COVER38
EOP
38

EX. R/W 200' "WRONG WAY" (KCR 0007) "CIVIL AIR TERMINAL" GRASS "DO NOT ENTER" 37 "TO TOLL NORTH" GRASS VE (MINOR ARTERIAL) 'ROUTE 1' ALS BRD BRD GBR O INLET BY R "LEFT TURN INLET 'U-TURN' 36 H

PROJECT STATUS: ---- UNKNOWN UTILITY

EAYIELD ON
GREEN"
D
GRASS
"LEFT TURN YIELD ON GREEN" "DO NOT ENTER"
TR37
AF
FI
C38
SI
GNEOP
AL

STOP BAR
C
AB
LE

PLOTSTYLE:Pennoni NCS.stb

PER DAC COMMENTS/CHECK PRINTS 39

REVISIONS
CONC. G
12" WATER MAIN
UTTER 38 CONC. GU CITY OF DOVER

REVISED PER COD PW

38TTER
CONC. CUNKNOWN COVER

REVISED PER KC PW
URB CONC. CU
BAR RB
STOP
"DO NOT ENTER" YIELD
SIGN

FINAL PLANS

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS0201.dwg PLOTTED:5/24/2023 4:43 , PMBY:Andrew Shields

UNKNOWN UTILITYGRASS
GRASS37
UNKNOWN UTILITY

TRAFFIC SIGNAL POLE UTILITY BOX 4 3 2 1 NO.

UTILITY POLECHAINLINK FENCE
36"LAFFERTY LN" "BAY RD" UTILITY POLE

2023-03-14 02/17/22 02/11/22 9/24/21
"ONE WAY"
"DIVIDED HIGHWAY" DATE

LAFF
GUY ANCHOR
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
GAS WITNESS POST ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED

347)
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON

)

ERTY THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

(KCR LECTOR
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
GAS WITNESS POST OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS

OL 5
SOLE RISK AND WITHOUT LIABILITY OR LEGAL

OR C 3 EXPOSURE TO PENNONI ASSOCIATES; AND OWNER

(MIN
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

LANE

PROJECT PLAWX21003

SOILS DATE 2021-07-14

TYPE DESCRIPTION HYDROLOGIC SOIL DRAWING SCALE 1"=30'

UDORTHENTS, 0 TO 10 PERCENT DRAWN BY SRA

UzC A
SLOPES
APPROVED BY GBR
0 30' 60'

CS0201
SHEET 2 OF 14
133

Paj 134

Item 5.

PENNONI ASSOCIATES INC.
SITE DATA
EXISTING TAX PARCELS ED-05-086.00-01-18.00-000 (LOT 1)

Christiana Executive Campus
1080 BAY RD, DOVER, DE 19901
0.2461 ACRES (10,721 SF)

ED-05-086.00-01-19.00-000 (LOT 2)

121 Continental Drive, Suite 207 TH E S LAND 1106 BAY RD, DOVER, DE 19901 TA S 0.4963 ACRES (21,618 SF) (Ri TE O N/F O PROPOSED CONCRETE CURB ght F D F -of- Wa ELAW (OT RO NO R ED-05-086.00-01-20.00-000 (LOT 3)

Newark, DE 19713-4310
UT
TH
DELDOT PCC 1-6 (TYP.) HE
y) AR RE
BAY RD, DOVER, DE 19901

E1
E XP 2.5600 ACRES (111,518 SF)
STORMWATER BASIN RE
SS

T 302.655.4451 F 302.654.2895 LIGHT DUTY BOTTOM ELEV. 26.00 PROPOSED DUMPSTER ENCLOSURE WA OWNER PATEL HOSPITALITY PROPERTIES ASPHALT PAVING 8,304 SF BOTTOM WITH WOOD PRIVACY FENCE & ED YS GATES CONTAINING (3) THREE 8 CF GE & OF FR OWNER ADDRESS 1640 POWDERHORN DRIVE DUMPSTERS PA EE LANDS N/F OF VIN WA NEWTOWN, PA 18940 THE STATE OF DELAWARE 30' G Y) AR (Right-of-way) TE EXISTING ZONING C4 (HIGHWAY COMMERCIAL) RIA Zoning N/A 35' LS 28 RE TR AR E EXISTING USE VACANT (ALL 3 EXISTING PARCELS) YA ET SE

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR
RD TB
SE AC PROPOSED USE (CONDITIONAL USE) MULTI-FAMILY APARTMENT - 54 UNITS
TB
AC K
K (FOLLOWING CONSOLIDATION OF 3 PARCELS)

LANE FIRE START DEPRESSED PROPERTY ACREAGE (CONSOLIDATED) 3.302 ACRES (143,857 SF) CURB END ZONING REGULATIONS 5' 8' DEPRESSED 10' 18' CURB4" SOLID YELLOW LINE

AND OWNER MUST BE NOTIFIED OF ANY

24VANREREQUIREDPROPOSED
FUSPEDESTRIAN
'18'EMINIMUM LOT WIDTH (FT)150682
9'TYP.1725.CONNECTION,
TYP.00'TYPE 1MINIMUM LOT DEPTH (FT)150297
'.3
7
24'8 5.MINIMUM FRONT YARD (FT)2089.75
70MINIMUM SIDE YARD (FT)1560.75
15'
R212MINIMUM REAR YARD (FT)10 OR EQ. BLDG
5'.0 9'
HEIGHT = 3586.09
22.00'39.96'R2
20.33'
STOPMAXIMUM BUILDING HEIGHT (FT)7535
5'ACTIVE RECREATION AREA
15.39'
20'8
SIGNMAXIMUM BUILDING HEIGHT (# OF STORIES)63

TB
R5 13,390 SQ. FT.

15' SIDE YARD SE

DISCREPANCIES BEFORE PROCEEDING WITH WORK

' (TYP.) SEE ACTIVE REC. PLAN FOR DETAIL MAXIMUM FLOOR AREA RATIO 4.0 (575,424 SF) 0.41 (59,313 SF) MAXIMUM LOT COVERAGE (%) 75% (107,893 SF) 72.2% (103,979 SF) 70.83' FRONT R3 PARKING RATIONALE FIRE LANE CURB STOP (TYP.) COVERED BICYCLE ' SIGN PARKING (8 SPACES) ADA PARKING SIGN (TYP. OF 6) FIRE LANE SIGN (1) "VAN ONLY" SIGN REQ. REQUIRED OFF-STREET PARKING 2 SPACES PER DWELLING UNIT + 1 SPACE FOR EVERY 200 SF OF OFFICE + ACK TH 0.25 SPACES PER DWELLING UNIT FOR VISITORS 3-STORY, 54-UNIT APARTMENT BUILDING F W R5 E R5 R3 = (2*54) + (1*0/200) + (0.25*54) O LA ' ' 22 /F E y) = 122 ' 19,771 SF FOOTPRINT N D a PEDESTRIAN 30 S F -W D O f PROPOSED OFF-STREET PARKING = 131 59,313 GFA CONNECTION, 'A N TE t-o REQUIRED HANDICAP PARKING = 5 (1 MUST BE VAN ACCESSIBLE) RT LA TA igh PROPOSED HANDICAP PARKING = 6 (1 VAN ACCESSIBLE) TYPE 3 ER S (R IA REQUIRED BICYCLE PARKING 1 PER 20 PROPOSED OFF-STREET PARKING SPACES FIRE LANE SIGN 24' 18' 18' 22' 18' LS A R TR E = 7 SPACES FIRE LANE EE PROPOSED BICYCLE PARKING = 8 SPACES FIRE LANE SIGN STOP SIGN T LIMIT OF DELDOT SIGN 14 9' SE REQUIRED DUMPSTERS 2 FOR FIRST 48 DWELLING UNITS + R1-1 30" T PAVEMENT BA 1 FOR EACH ADDITIONAL 24 UNITS OR FRACTION SECTION CK REAR =3 15 PROPOSED DUMPSTERS =3 R5 10 'S ' ID 65.78' E R2 SE EXISTING LAND USE SUMMARY 5' TB

BAY POINTE APARTMENTS AC

SITE IMPROVEMENT PLAN

5'K
11R5
'
R2

PATEL HOSPITALITY PROPERTIES

1216" WIDE WHITE.75
.47'
(TYP. AT STOPSTOP
12.25'
'LOT 1LOT 2LOT 3TOTALS
4" SOLID24'BARS)SIGNBUILDINGS (PRIMARY)0 SF0 SF0 SF0 SF(0%)
87.00'
R5
(TYP.)'

BAY ROAD 5'

YELLOW LINEPROPOSED PCCR14" SOLIDOTHER IMPERVIOUS SURFACE0 SF1,049 SF0 SF1,049 SF(0.7%)
R
OPEN SPACE10,721 SF20,569 SF111,518 SF142,808 SF (99.3%)

3171 DUPONT PARKWAY 1-6 CURB (TYP.) 15 YELLOW TOTAL 10,721 SF 21,618 SF 111,518 SF 143,857 SF (100%) ' LINE STOP SIGN 87.00' 85.00' 12 18' R1-1 30" 20 A 15' WIDE PERMANENT EASEMENT IS HEREBY ESTABLISHED FOR THE PROPOSED LAND USE SUMMARY 30' ARTERIAL STREET SETBACK STATE OF DELAWARE AS PER THIS PLAT CONSOLIDATION OF LOTS 1-3 BUILDINGS (PRIMARY) 19,771 SF (13.7%)

CITY OF DOVER, DLEAWARE 19901
TOWNSEND, DELAWARE 19734
20' FRONT YARD SETBACK OTHER IMPERVIOUS SURFACE 84,208 SF (58.5%)
15' PERMANENT EASEMENT OVERALL IMPERVIOUS COVERAGE 103,979 SF (72.2%)
OPEN SPACE 39,878 SF (27.8%)
TOTAL 143,857 SF

LANDSCAPE PLANTING REGULATIONS

"NO STOPPING50.33'REQUIREDPROPOSED
STANDING ORTREE PLANTINGS4854
GRASS
PARKING"35.37'SHRUB PLANTINGS0162
GRASSEDGE OF PAVING
EOP
EDGE OF TRAVEL LANE (WHITE STRIPE)APARTMENT UNIT SUMMARY
PROPOSED
PROPOSED BLENDEDONE BEDROOM UNIT38

STOP BAR
662' SIGHT TRIANGLE TRANSITION TWO BEDROOM UNIT
TOTAL UNITS
16
54

BAY ROAD
EOP EOP
"TURN LANE"
EOP

EX. R/W 200' "WRONG WAY" (KCR 0007) "CIVIL AIR TERMINAL" GRASS "DO NOT ENTER" "TO TOLL NORTH" GRASS INLET STA 2+35.89 OFF 0.0' "LEFT TURN 'ROUTE 1' (MINOR ARTERIAL) SITE CONSTRUCTION NOTES: 15. BREAKAWAY POSTS SHALL BE USED WHEN INSTALLING ALL SIGNS. DETAIL T-15. REFERENCE DELDOT STANDARD CONSTRUCTION INLET 'U-TURN' UNKNOWN UTILITY YIELD ON 1. ALL WORK SHALL COMPLY WITH ALL APPLICABLE STATE, FEDERAL AND LOCAL CODES. ALL NECESSARY LICENSES AND ALS SRA BRD BRD GBR BY GREEN" GRASS 1+00 2+00 3+00 4+00 5+00 6+00 7+00

PROJECT STATUS: ---- "LEFT TURN YIELD ON GREEN" "DO NOT ENTER" PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT HIS EXPENSE UNLESS PREVIOUSLY OBTAINED BY OWNER. THE 16. THE CONTRACTOR SHALL NOTIFY THE FOLLOWING, TWO (2) WEEKS PRIOR TO THE START OF CONSTRUCTION: CONTRACTOR SHALL ERECT AND MAINTAIN, AS REQUIRED BY THE CONDITIONS AND PROGRESS OF THE WORK, ALL 16.1. THE OWNER, KENT CONSERVATION DISTRICT, & SITE ENGINEER NECESSARY SAFEGUARDS FOR SAFETY AND PROTECTION. EOP

PER DAC COMMENTS / CHECK PRINT SUBMISSION 2. THE CONTRACTOR SHALL IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES OR ERRORS THEY DISCOVER IN 17. THE CONTRACTOR SHALL MAINTAIN PUBLIC ROADS AND STREETS IN A BROOM SWEPT CONDITION AT ALL TIMES.

STOP BAR THE PLAN. 18. THE CONTRACTOR SHALL REMOVE AND IMMEDIATELY REPLACE, RELOCATE, RESET OR RECONSTRUCT ALL OBSTRUCTIONS 3. DEVIATION FROM THESE PLANS AND NOTES WITHOUT THE PRIOR CONSENT OF THE OWNER OR HIS REPRESENTATIVE OR IN THE WORK AREA, INCLUDING, BUT NOT LIMITED TO, MAILBOXES, SIGNS, LANDSCAPING, LIGHTING, PLANTERS, CULVERTS,

PLOTSTYLE:Pennoni NCS.stb THE ENGINEER MAY BE CAUSE FOR THE WORK TO BE REJECTED. DRIVEWAYS, PARKING AREAS, CURBS, GUTTERS, FENCES, OR OTHER NATURAL OR MAN-MADE OBSTRUCTIONS. TRAFFIC CONTROL REGULATORY, WARNING AND INFORMATION SIGNS SHALL REMAIN FUNCTIONAL AND VISIBLE TO THE 4. ALL MATERIALS SHALL BE NEW AND SHALL BE ASBESTOS AND VERMICULITE FREE. ALL MATERIALS SHALL BE STORED SO APPROPRIATE LANES OF TRAFFIC AT ALL TIMES, WITH THEIR RELOCATION KEPT TO A MINIMUM DISTANCE. AS TO ASSURE THE PRESERVATION OF THEIR QUALITY AND FITNESS FOR THE INTENDED WORK. CONC. G

REVISIONS UTTER CONC. GU TTER 5. DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. CONTRACTOR SHALL BE 19. TRANSITIONS FROM PROPOSED SIDEWALK AND CURB TO EXISTING SHALL BE MADE AT THE NEAREST EXISTING JOINT.

PER DELDOT COMMENTS CONC. C CONC. CU URB RESPONSIBLE FOR ALL WORK TO BE PERFORMED. IT MUST BE IN COMPLIANCE WITH THE OCCUPATIONAL SAFETY AND BAR RB

REVISED PER COD PW STOP HEALTH ACT OF 1970, AS AMENDED AND ALL RULES AND REGULATIONS THERETO APPURTENANT.

REVISED PER KC PW "DO NOT ENTER" YIELD SIGN FIRE MARSHAL NOTES: UNKNOWN UTILITY 6. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD LOCATE AND RECORD AND DAMAGE TO EXISTING PAVING, SIDEWALK, GRASS CURB OR STRUCTURES NOT TO BE REMOVED OR REPLACED, ENGINEER TO VERIFY LOCATION AND EXTENT OF DAMAGE.

FINAL PLANS

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS1001.dwg PLOTTED:5/24/2023 4:43 , PMBY:Andrew Shields GRASS 1. ALL FIRE LANES, FIRE HYDRANTS, AND FIRE DEPARTMENT CONNECTIONS SHALL BE MARKED IN ACCORDANCE WITH UNKNOWN UTILITY 7. THE CONTRACTOR SHALL MAINTAIN ONE COMPLETE SET OF CONTRACT DRAWINGS ON WHICH HE SHALL NOTE, IN RED, THE STATE FIRE PREVENTION REGULATIONS. THE ALIGNMENTS AND INVERTS OF ALL UNDERGROUND UTILITIES INSTALLED OR ENCOUNTERED DURING THE PROSECUTION OF THE WORK. ALL DISCREPANCIES BETWEEN THE PLAN LOCATIONS AND ELEVATIONS OF BOTH THE 2. THE FOLLOWING WATER FOR FIRE PROTECTION REQUIREMENTS APPLY: MAIN SIZES: 6" MINIMUM. MINIMUM CAPACITY: UTILITY BOX EXISTING AND PROPOSED UTILITIES SHALL BE SHOWN ON THE AS-BUILT DRAWINGS TO BE MAINTAINED BY THE 1,000 GPM @ 20 PSI RESIDUAL FOR 1 HOUR DURATION. HYDRANT SPACING: 800' ON CENTER (DSFPR REGULATION 702, CONTRACTOR IN THE FIELD. CHAPTER 6, SECTION 3). UTILITY POLE CHAINLINK FENCE 5 4 3 2 1 NO. "LAFFERTY LN" "BAY RD" UTILITY POLE 8. THE CONTRACTOR SHALL OPEN ONLY THAT SECTION OF TRENCH OR ACCESS PITS WHICH CAN BE BACKFILLED AND 3. LOCK BOX WILL BE REQUIRED. CONTACT LOCAL FIRE CHIEF FOR ORDERING INFORMATION AND LOCATION OF BOX ON "ONE WAY" STABILIZED AT THE END OF EACH WORKING DAY. STEEL PLATES SHALL BE USED ON ANY TRENCH OR ACCESS PITS WHICH THE BUILDING.

2023-03-14 2023-01-12
"DIVIDED HIGHWAY"

LA MUST REMAIN OPEN OVERNIGHT. THIS REQUIREMENT DOES NOT APPLY TO AREAS COMPLETELY CLOSED AND SECURE

02/17/22 02/11/22 9/24/21 DATE GUY ANCHOR FROM VEHICULAR OR PEDESTRIAN TRAFFIC. 4. THE PROPOSED BUILDING SHALL BE THREE STORY (35 FT MAX.)

ERTY

GAS WITNESS POST 9. DAMAGE TO EXISTING PAVING, SIDEWALK, CURB OR STRUCTURES NOT TO BE REPLACED OR REMOVED DURING 5. THE PROPOSE BUILDING CONSTRUCTION TYPE PER NFPA 220, STANDARD ON TYPES OF BUILDING CONSTRUCTION, CONSTRUCTION SHALL BE IMMEDIATELY REPORTED TO ENGINEER, CONTRACTOR SHALL REPAIR OR REPLACE ALL SHALL BE TYPE V(000). ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES O DAMAGED WORK WITHOUT CHARGE TO THE OWNER. (MIN ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE

LAFF (KCR 347)

  • 6.AUTOMATIC FIRE SPRINKLERS ARE PROPOSED FOR THIS STRUCTURE AND SHALL BE MONITORED BY AN APPROVED PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
  • 10.MISS UTILITY SHALL BE NOTIFIED THREE (3) DAYS PRIOR TO EXCAVATION. FIRE ALARM SYSTEM.

R CO THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER GAS WITNESS POST PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION 11. ALL DISTURBED AREAS WITHIN THE LIMIT OF DISTURBANCE, BUT NOT IN PAVEMENT, SHALL BE TOP-SOILED (6" MINIMUM), 7. FIRE DEPT. CONNECTION SHALL BE WITHIN 50 FEET OF MAIN ENTRANCE. ACCESS TO THE FIRE DEPT. CONNECTION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS

LLEC

SEEDED AND MULCHED. IF THE ENGINEER DETERMINES THAT A SATISFACTORY STAND OF GRASS DOES NOT EXIST AT THE SHALL BE CLEAR AND UNOBSTRUCTED AS DEFINED BY THE STATE FIRE REGULATIONS. FIRE DEPT. CONNECTION SOLE RISK AND WITHOUT LIABILITY OR LEGAL TIME OF FINAL INSPECTION, ALL COSTS ASSOCIATED WITH RE-ESTABLISHING A SATISFACTORY STAND OF GRASS SHALL BE SHALL BE WITHIN 300 FEET OF A FIRE HYDRANT, MEASURED AS HOSE WOULD OFF THE FIRE EQUIPMENT. EXPOSURE TO PENNONI ASSOCIATES; AND OWNER AT THE CONTRACTOR'S EXPENSE. SHALL INDEMNIFY AND HOLD HARMLESS PENNONI TOR 8. ADDRESS NUMBERS OF AT LEAST 12 INCHES IN HEIGHT MUST BE PLACED ON THE STREET SIDE OF THE BUILDING AND ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND ) 12. ALL SIGNING FOR MAINTENANCE OF TRAFFIC IS THE CONTRACTORS RESPONSIBILITY, AND SHALL FOLLOW THE GUIDELINES VISIBLE FROM THE STREET. EXPENSES ARISING OUT OF OR RESULTING THEREFROM. SHOWN IN LATEST EDITION OF "DELAWARE TRAFFIC CONTROLS FOR STREETS AND HIGHWAY CONSTRUCTION, PLAWX21003 NE MAINTENANCE, UTILITY, AND EMERGENCY OPERATIONS." PROJECT CITY OF DOVER GENERAL NOTES: 13. DESIGN, FABRICATION AND INSTALLATION OF ALL PERMANENT SIGNING SHALL BE AS OUTLINED IN THE LATEST VERSION OF THE DE MUTCD. 1. OWNERSHIP OF THE PROPOSED ACTIVE RECREATION AREA SHALL BE RETAINED BY THE DEVELOPER OR A DATE 2021-07-14 DESIGNATED HOMEOWNER'S / MAINTENANCE ASSOCIATION. THE ASSOCIATION SHALL BE RESPONSIBLE FOR THE 14. DESIGN AND INSTALLATION OF ALL PAVEMENT MARKINGS AND STRIPING SHALL BE AS OUTLINED IN THE LATEST VERSION MAINTENANCE, INSURANCE AND TAXES ON THE RECREATION AREA. DRAWING SCALE 1"=30' OF THE DE MUTCD. FOR FINAL PERMANENT PAVEMENT MARKINGS: 2. SANITATION SERVICES SHALL BE PROVIDED BY A PRIVATE SANITATION HAULER. DRAWN BY SRA a) EPOXY RESIN PAINT SHALL BE REQUIRED FOR LONG LINE STRIPING. b) THERMO PLASTIC (EXTRUDED OR PREFORMED MATERIAL) WILL BE REQUIRED ON ASPHALT SURFACES, FOR SHORT LINE APPROVED BY GBR STRIPING, I.E. SYMBOLS/LEGENDS.

CS1001 c) PERMANENT PAVEMENT MARKING TAPE (PER DELDOT APPROVED MATERIALS LIST) WILL BE REQUIRED ON CONCRETE SURFACES, FOR SHORT LINE STRIPING, I.E. SYMBOLS/LEGENDS. 0 30' 60'

SHEET 3 OF 14 134

Paj 135

Item 5.

PENNONI ASSOCIATES INC. TH E S LAND TA S (Ri TE O N/F O ght F D F RO ACTIVE RECREATION CALCULATION Christiana Executive Campus -of- Wa ELAW (OT y) AR HE RE UT E1 E XP PER ARTICLE 5, SECTION 10.514 ("RESIDENTIAL DEVELOPMENTS OF TEN (10) OR FEWER RE ACRES WITH A DENSITY OVER SIX UNITS PER ACRE") SS

121 Continental Drive, Suite 207 W AY ED S& REQUIRED ACTIVE RECREATION SPACE 150 SF PER DWELLING UNIT OR 10,000 SF GE OF FR (WHICHEVER IS GREATER) PA EE = 7,200 SF (150 * 54) OR 10,000 SF LANDS N/F OF WA

Newark, DE 19713-4310 30' VIN Y) = 10,000 SF THE STATE OF DELAWARE A G RT PROPOSED ACTIVE RECREATION SPACE = 13,390 SF (PROVIDED ON SITE) (Right-of-way) ER 35' IAL Zoning N/A 28 RE ST AR REE

T 302.655.4451 F 302.654.2895
YA T
RD SETB
SE AC
TB
AC K
K

LANE FIRE NO RTH

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR
VAN RE
FU
SE
SEE ENLARGEMENT
17
ON THIS SHEET

AND OWNER MUST BE NOTIFIED OF ANY 8 ACTIVE RECREATION AREA

15' SIDE YARD SE 13,390 SQ. FT. SEE ACTIVE REC. PLAN FOR DETAIL

TBACK PICNIC PAVILION/GAZEBO

DISCREPANCIES BEFORE PROCEEDING WITH WORK

143 TH E , 3-STORY, 54-UNIT APARTMENT BUILDING 3.3 856 S F W O LA 22 025 F /F E y) 19,771 SF FOOTPRINT AC 1 N D a . 30 S F -W D O f 59,313 GFA 'A N TE t-o RT LA TA igh ERI S (R COVERED KAYAK/CANOE AL E ST AR STORAGE RE ET 14 SE TB AC K 15 10 'S ID E SE TB AC K

BAY POINTE APARTMENTSACTIVE RECREATION PLANPATEL HOSPITALITY PROPERTIES
1220

30' ARTERIAL STREET SETBACK

BAY ROAD 3171 DUPONT PARKWAY 20' FRONT YARD SETBACK

131.86' 64.93' 369.00'
S 21°36'00" E S 21°36'00" E S 21°36'00" E

CITY OF DOVER, DLEAWARE 19901 TOWNSEND, DELAWARE 19734 50.33'

35.37'
CANOE/KAYAK STORAGE
GRASS GRASS
EDGE OF PAVING
EOP
EDGE OF TRAVEL LANE (WHITE STRIPE)

0 30' 60' OVERALL RECREATION PLAN SCALE: 1" = 30'

COVERED BICYCLE PARKING

8ACTIVE RECREATION AREA
13,390 SQ. FT.
SEE ACTIVE REC. PLAN FOR DETAIL
ALSBRDBRDGBRBY
16' DIA. - ADA ACCESSIBLE

PROJECT STATUS:
----
GAZEBO WITH ADA ACCESSIBLE
PICNIC TABLE INSIDE

PER DAC COMMENTS/CHECK PRINT SUBMISSION PICNIC TABLE TYP.

PLOTSTYLE:Pennoni NCS.stb
143
,
3.3 856 S
025 F

REVISIONS

AC 1
.
30

REVISED PER COD PW 'A

REVISED PER KC PW
RT
ER
COVERED KAYAK/CANOE IA
LS OUTDOOR FITNESS STATIONS COVERED BICYCLE RACK
FINAL PLANS

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS1002.dwg PLOTTED:5/24/2023 4:44 , PMBY:Andrew Shields

STORAGETR
EET
14SE
TB
ACK4321NO.
OUTDOOR FITNESS
STATIONS
2023-03-14
60.00'
02/17/2202/11/229/24/21
10DATE

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON

30.00' SAND VOLLEYBALL COURT THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

PROJECT PLAWX21003
20
DATE 2021-07-14
30' ARTERIAL STREET SETBACK DRAWING SCALE AS SHOWN

DRAWN BY SRA 20' FRONT YARD SETBACK SAND VOLLEYBALL COURT APPROVED BY GBR

020'40'ACTIVE RECREATION AREA ENLARGEMENT
SCALE: 1" = 20'
ADA COMPLIANT PICNIC TABLE
CS1002
SHEET4OF 14
135

Paj 136

Item 5.

PENNONI ASSOCIATES INC.
V NO
RTH
RCP
CL
30"
Christiana Executive Campus

121 Continental Drive, Suite 207
DMH-208 60" MANHOLE
RIM 35.45
39 INV IN 30.40 (18" S) EXISTING HW

Newark, DE 19713-4310

INV OUT 28.67 (24" N)INV IN 30.38
INV OUT 30.45 (15" E)
SUMP 26.67
GRADING NOTES:
T 302.655.4451 F 302.654.2895
38
OS-1 60" MANHOLE
EW-301 WINGWALLRIM 36.06501.BEDDING REQUIREMENTS SPECIFIED HEREIN ARE TO BE CONSIDERED AS
GRATE 34.0631INV IN 29.71 (24" E)45
MINIMUMS FOR RELATIVELY DRY, STABLE EARTH CONDITIONS. ADDITIONAL
I-207INV IN 31.70 (OS-1)INV IN 28.6740
(24" S)
ADS STORMTECH32BEDDING SHALL BE REQUIRED FOR ROCK TRENCHES AND WET AREAS.
RIM 34.64INV OUT 31.75 (24" W)
35
ISOLATOR ROWCONTRACTOR SHALL HAVE THE RESPONSIBILITY TO PROVIDE SUCH ADDITIONAL

RO
INV IN 30.60 (18" SE) SUMP 26.67
33 BEDDING AS MAY BE REQUIRED TO PROPERLY CONSTRUCT THE WORK.
INV OUT 30.60 (18" N) (OT
UT

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR INSPECTION PORT

SUMP 30.35HE
RE
E1
342.COMPACTION OF THE BACKFILL OF ALL TRENCHES SHALL BE COMPACTED TO
XP
35STORMWATER BASINRESTHE DENSITY OF 95% OF THEORETICAL MAXIMUM DRY DENSITY (ASTM D698).
I-206BOTTOM ELEV. 26.0033I-104 24 L X 30 WSWBACKFILL MATERIAL SHALL BE FREE FROM ROOTS, STUMPS, OR OTHER FOREIGN
36AY
RIM 34.808,304 SF BOTTOMGRATE 35.70EDS&DEBRIS AND SHALL BE PLACED IN LIFTS NOT TO EXCEED 8 INCHES IN
INV IN 30.78 (I-102)GE
INV IN 30.67 (18" SE)34OFFRCOMPACTED FILL THICKNESS. CORRECTION OF ANY TRENCH SETTLEMENT
INV OUT 30.67 (18" NW)INV OUT 30.28PAEEWWITHIN A YEAR FROM THE DATE OF APPROVAL WILL BE THE RESPONSIBILITY OF
SUMP 30.6735
36VINAY
38G)THE CONTRACTOR. MATERIAL THAT CANNOT BE COMPACTED AS REQUIRED
SHALL BE BROUGHT TO THE ATTENTION OF A GEOTECHNICAL ENGINEER, OVER

AND OWNER MUST BE NOTIFIED OF ANY TC 35.60 BC 35.10

28 EXCAVATED, AND THEN REPLACED WITH SUITABLE FILL.
I-205
RIM 34.80 35 36
3. THE CONTRACTOR WILL INSURE THAT POSITIVE AND ADEQUATE DRAINAGE IS
INV IN 30.91 (18" E)
TC 36.75
BC 36.25

35 MAINTAINED AT ALL TIMES WITHIN THE PROJECT LIMITS. THIS MAY INCLUDE, BUT INV OUT 30.91 (18" NW) NOT BE LIMITED TO, REPLACEMENT OR RECONSTRUCTION OF EXISTING SUMP 30.66 DRAINAGE STRUCTURES THAT HAVE BEEN DAMAGED OR REMOVED OR

3737.35
3737.8637.3534REGRADING AS REQUIRED BY THE ENGINEER, EXCEPT FOR THOSE DRAINAGE
DMH-105 60" MANHOLEITEMS SHOWN AT SPECIFIC LOCATIONS AND HAVING SPECIFIC PAY ITEMS IN THE

DISCREPANCIES BEFORE PROCEEDING WITH WORK I-103 RIM 36.22 DETAILED ESTIMATE. NO SEPARATE PAYMENT WILL BE MADE FOR ANY COSTS GRATE 34.30 TC/BC 38.20

36

INV IN 29.93 (24" N)INV OUT 31.30INCURRED TO COMPLY WITH THIS REQUIREMENT.
VANINV IN 30.17 (18" E)RE
35FU35
INV IN 28.67 (24" S)SETC 36.50

17
BC 36.00

33 4. THE CONTRACTOR SHALL PROVIDE ANY AND ALL EXCAVATION AND MATERIAL INV OUT 29.71 (24" W) TC 37.10

35 SAMPLES NECESSARY TO CONDUCT REQUIRED SOIL TESTS. ALL BC 36.60

SUMP 26.67
ARRANGEMENTS AND SCHEDULING FOR THE TESTING SHALL BE THE
CONTRACTOR'S RESPONSIBILITY.
TC 37.50
BC 37.00

TC/BC 37.70

  • 5.SOILS TESTING AND ON-SITE INSPECTION SHALL BE PERFORMED BY AN 8 37.93 TC/BC 37.70 TC 37.69 BC 37.19 0 5.1 INDEPENDENT GEOTECHNICAL ENGINEER. THE SOILS ENGINEER SHALL PROVIDE 33 x3 COPIES OF TEST REPORTS TO THE CONTRACTOR, THE OWNER AND THE 35 OWNER'S REPRESENTATIVE AND SHALL PROMPTLY NOTIFY THE OWNER, HIS x 35.10 36 38.60

REPRESENTATIVE AND THE CONTRACTOR, SHOULD WORK PERFORMED BY THE
18"X18" ADS N-12 36
38.18
38.18
37.93

15"X15" ADS N-12 TOP MANIFOLDTOP MANIFOLDCONTRACTOR FAIL TO MEET BUILDING STANDARDS.
35INVERT: 30.45"I-102
34INVERT: 30.17".25
x
34x 3535.10 35.45
xGRATE
6. CONTRACTOR SHALL FURNISH AND MAINTAIN ALL NECESSARY BARRICADES
.70INV IN 31.15 (I-103)
35AROUND THE WORK AREA AND SHALL PROVIDE PROTECTION AGAINST WATER
INV IN 31.46 (I-101)
DAMAGE AND SOIL EROSION.
INV OUT 31.40
3-STORY, 54-UNIT APARTMENT BUILDING
2235
TC 35.90
  • 7.MAXIMUM SIDEWALK CROSS SLOPE IS 2% AND MINIMUM SIDEWALK CROSS 19,771 SF FOOTPRINT BC 35.40

SLOPE IS 1% FOR ADA ACCESSIBLE AREAS.
59,313 GFA

BAY POINTE APARTMENTS
FFE=38.60
TC 36.65
BC 36.15

PATEL HOSPITALITY PROPERTIES
8. VERTICAL ELEVATIONS ARE BASED ON NAVD 88.
35
36
36 9. ALL SLOPES MAXIMUM 3:1 UNLESS OTHERWISE NOTED.

BAY ROAD 14 I-101

GRADING PLAN 3171 DUPONT PARKWAY

37.9337.933637.9337.93
GRATE 35.25I-100 30 L X 48 W
37.93
INV IN 31.98 (I-100)GRATE 35.85
37TC 37.65
BC 37.15

INV OUT 31.73 INV IN 3
6
32.53 (I-99)
I-204 TC 37.50

10 INV OUT 32.25 BC 37.00

GRATE 35.41

36INV IN 31.98 (I-203)
INV OUT 31.7336
37

CITY OF DOVER, DLEAWARE 19901 TOWNSEND, DELAWARE 19734 TC 36.21

I-202
BC 35.71
TC 37.65 TC 37.65
BC 37.15 BC 37.15

37
TC 37.65
BC 37.15

I-203 GRATE 36.42 TC 36.45
BC 35.95
36
GRATE 36.26 INV IN 32.82 (I-201) I-201
TC 37.65
BC 37.15
TC 37.65
BC 37.15

36
INV IN 32.14 (I-202) INV OUT 32.82 GRATE 36.36 37
INV IN 32.14 (I-302) INV37
OUT 33.00 BC 37.25

37
INV OUT 32.14
36 12 38 20
36.61
BC 37.50

I-99 30 L X 48 W GRATE 35.95 INV OUT 33.09 37

50.33'
SWALE 1 (START) 2'

GRASS3636GRASS35.37'
BOTTOM WIDTH
37GRASS37EDGE OF PAVING
37
EOP3838BENCHMARK
SWALE 2 (START)38
EOP
38
37.47 (PK
2' NAIL)
BOTTOM WIDTHSWALE 2 (END)EDGE OF TRAVEL LANE (WHITE STRIPE)
2' BOTTOM WIDTH
38I-301I-302SWALE 1 (END)
GRATE 35.59GRATE 36.602' BOTTOM WIDTH
ALSBRDBRDGBRBY
INV OUT 32.66

PROJECT STATUS: ---- INV IN 32.38 (I-301)

STOP BAR INV OUT 32.38 662' SIGHT TRIANGLE

BAY ROAD EOP EOP

PER DAC COMMENTS/CHECK PRINT SUBMISSION 38 EOP

38(KCR 0007)
GRASS37GRASS
(MINOR ARTERIAL)

PLOTSTYLE:Pennoni NCS.stb O VE STA 2+35.89 INLET R OFF 0.0' INLET 36 H EA UNKNOWN UTILITY D GRASS 0+00 1+00 2+00 TR 3+00 37 4+00 5+00 6+00 7+00 AF

REVISIONS FI C 38 SI

REVISED PER COD PW G N EOP

REVISED PER KC PW AL

STOP BAR
C
AB
LE

FINAL PLANS

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS1501.dwg PLOTTED:5/24/2023 4:44 , PMBY:Andrew Shields 38.67 BC

38.47 38.71 BC

38.74 BC 39 38.66 BC 38.67 BC 38.76 BC 38.58 BC 38.78 BC x x x 38.46 BC 38.40 BC x x x x x 38.36 BC 38.43

12" WATER MAIN

37.95 BC x
x x x
38.42 BC x

CONC. G

xx38.61 BC
MATCH38.42
x
UTTER38CONC. GUCITY OF DOVER
EXISTING37.91

38
37.92 BC
TTER
38
x

UNKNOWN COVER

37.26 TC/BC x x x

CONC. C NO.
x x MATCH
37.88 TC

CONC. CUR

x EXISTING

URB

37.38 BC x x 37.43 4 3 2 1
R
x

P BA 37.01 TC/BC

B
38 STO

38.2938.28 BC37.55 TC
xx38.25 BCx
x37.87 BC37.05 BC
x
x37.75 BC
37.8837.7338.35
x37.99 BCx
38.32 BC

2023-03-14
37.19 TC/BC 38.18 BC
x

02/17/22 02/11/22
x 37.78 BC

9/24/21
37.56 TC x

UNKNOWN UTILITY DATE

37.06 BC37.25xx
xx

GRASS 37.35

37
x
x x

37
37.28 37.55

GRASS

x 37.10
36.94 TC/BC
x

37
x x
MATCH 37.07 TC x 37.03
37.65
EXISTING 36.57 BC

UNKNOWN UTILITY

36.98 BC 36.85 BC

x MATCH EXISTING 37.16 ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES TRAFFIC SIGNAL POLE ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED UTILITY BOX TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION UTILITY POLE UTILITY POLE CHAINLINK FENCE OR ADAPTATION BY PENNONI ASSOCIATES FOR THE 36 SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL

LAFF
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
GUY ANCHOR ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.
GAS WITNESS POST

(MIN PROJECT PLAWX21003

ERTY
347)
GAS WITNESS POST DATE 2021-07-14
)
(KCR LECTOR
DRAWING SCALE N.T.S.

OL 5
OR C 3
DRAWN BY SRA

LANE APPROVED BY GBR

030'60'
CS1501
SHEET5OF 14
136

Paj 137

Item 5.

PENNONI ASSOCIATES INC. 39 EXISTING HW CITY OF DOVER UTILITY NOTES (WATER SERVICE): INV IN 30.38 1. ALL WATER UTILITY COMPONENTS MUST MEET THE REQUIREMENTS OF THE WATER

Christiana Executive Campus WASTEWATER HANDBOOK, EFFECTIVE DATE MARCH 22, 2010. 38 2. ALL PROPOSED WATER MAINS SHALL BE CEMENT LINED CLASS 52 DUCTILE IRON PIPE 50

121 Continental Drive, Suite 207
IN ACCORDANCE WITH AWWA C151, LATEST REVISION.

3145
40
THL
32E S AND353.THE USE OF HYDRANTS DURING/FOR CONSTRUCTION PURPOSES SHALL BE
TA SPROHIBITED. THIS METHOD MAY NOT BE UTILIZED DURING ANY PHASE OF THE
(Ri TE O N/F O
RONewark, DE 19713-4310
33NO
ght F D FR THPROJECT.
-of-
Wa ELAW(OT
y) AR HE
RE UT 4. ANY EXISTING WATER LINES NOT TO BE UTILIZED BY THE PROPOSED FACILITY MUST
E
34EXP

T 302.655.4451 F 302.654.2895 1 STORMWATER BASIN RE BE PROPERLY ABANDONED AT THE MAINS IN ACCORDANCE WITH THE CITY OF DOVER

3533S
36BOTTOM ELEV. 26.00SWDEPARTMENT OF WATER & WASTEWATER SPECIFICATIONS AND REQUIREMENTS.
8,304 SF BOTTOMEDAY
GES&
34OFFR5.THE SITE CONTRACTOR SHALL CONTACT THE CITY OF DOVER DEPARTMENT OF
PAEEWATER AND WASTEWATER CONSTRUCTION MANAGER AT (302) 736-7025 PRIOR TO
LANDS N/F OF36VINWA
38THE STATE OF DELAWARE35GY)THE START OF CONSTRUCTION. A REPRESENTATIVE FROM THE CITY OF DOVER
(Right-of-way)DEPARTMENT OF WATER & WASTEWATER MUST OBSERVE AND APPROVE ALL CITY
Zoning N/A

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR

28OWNED WATER INTERCONNECTIONS AND TESTING. ALL WATER TAPS MUST BE
PERFORMED BY A CITY OF DOVER APPROVED CONTRACTOR. THE PROPOSED
3536LOCATION FOR THE WATER CONNECTION MAY NEED TO BE ADJUSTED IN THE FIELD
35DUE TO CONDITIONS OF THE EXISTING MAIN. POSSIBLE CONDITIONS THAT WOULD
REQUIRE RELOCATIONINCLUDE PROXIMITY TO PIPE JOINTS, OTHER TAPS,
CONCRETE ENCASEMENTS, CONFLICT WITH OTHER UTILITIES, AND THE LIKE. TEST
3734HOLES MUST BE PREFORMED BY THE CONTRACTOR TO DETERMINE THE BEST
37
TAPPING LOCATION. THE CITY OF DOVER WILL NOT BE HELD RESPONSIBLE FOR
FIELD CONDITIONS REQUIRING ADJUSTMENT OF THE TAPPING LOCATION OR FOR ANY

AND OWNER MUST BE NOTIFIED OF ANY 36 WORK REQUIRED BY THE CONTRACTOR TO MAKE APPROPRIATE AND LAWFUL

VANRE
35FUCONNECTION.
SE35
1733
35 PROPOSED 6. ALL EXISTING UTILITIES SHALL BE ADJUSTED TO FINAL GRADE IN ACCORDANCE WITH
HYDRANTTHE CURRENT CITY OF DOVER REQUIREMENTS AND PRACTICES.
  • 7.NO TREES MAY BE PLANTED WITHIN TEN FEET (10') OF UTILITY INFRASTRUCTURE. PROPOSED WATER

DISCREPANCIES BEFORE PROCEEDING WITH WORK

SHUT OFF VALVE (TYP)8ACTIVE RECREATION AREA
13,390 SQ. FT.
33SEE ACTIVE REC. PLAN FOR DETAILKENT COUNTY UTILITY NOTES (SANITARY SEWER):
3635
361.THE SITE CONTRACTOR SHALL CONTACT THE KENT COUNTY PUBLIC WORKS
35PROPOSED FIRE DEPT.
34
DEPARTMENT AT (302) 744-2430 PRIOR TO THE START OF SANITARY SEWER
CONNECTION.
34CONSTRUCTION.
  • 2.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE AND PERFORM ANY TH E REQUIRED SANITARY SEWER BYPASS OR RELATED ACTIVITIES WITH KENT COUNTY 3-STORY, 54-UNIT APARTMENT BUILDING F W O LA PUBLIC WORKS DEPARTMENT. 22 35 /F E y) N D a 19,771 SF FOOTPRINT S F -W 3. KENT COUNTY SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE PORTION OF SEWER D O f N TE t-o 59,313 GFA PROPOSED PROPOSED LA TA igh DOWNSTREAM OF THE CLEANOUT LOCATED AT THE PROPERTY/ROW. THE PROPERTY SANITARY FFE=38.60 ELECTRIC CLEANOUT S (R OWNER SHALL BE RESPONSIBLE FOR MAINTENANCE OF THE PORTION OF SEWER 35 UPSTREAM OF THE AFOREMENTIONED CLEANOUT. A SERVICE E 36 R (TYP.) PROPOSED 36 COMMUNICATION 14 SERVICE GENERAL UTILITY NOTES: 36

36
37

10 1. ALL WORK SHALL COMPLY WITH APPLICABLE STATE, FEDERAL AND LOCAL CODES. ALL NECESSARY LICENSES AND PERMITS SHALL BE OBTAINED BY THE CONTRACTOR

BAY POINTE APARTMENTS 36 AT HIS EXPENSE UNLESS PREVIOUSLY OBTAINED BY THE OWNER.

PATEL HOSPITALITY PROPERTIES 36 PROPOSED WATER 2. THE CONTRACTOR SHALL IMMEDIATELY INFORM THE ENGINEER OF ANY 37 SHUT OFF VALVE (TYP) PROPOSED 8" CEMENT DISCREPANCIES OR ERRORS THEY DISCOVER IN THE PLAN. 37 LINED, CL 52 DIP FIRE

BAY ROAD

102 LF 8" SDR-35 @ 0.020 FT/FT36
SERVICE LINE3.DEVIATION FROM THESE PLANS AND NOTES WITHOUT THE PRIOR CONSENT OF THE

3171 DUPONT PARKWAY 36 OWNER OR HIS REPRESENTATIVE OR THE ENGINEER MAY BE CAUSE FOR THE WORK

UTILITY PLAN

37PROPOSED WATERPROPOSED COMBINED 8"
37METER PITTO BE REJECTED.
CEMENT LINED, CL 52 DIP37
PROPOSED 4" CEMENTDOMESTIC/FIRE SERVICE LINE4.UTILITIES ENTER THE PREMISES FROM PUBLIC STREETS OR RIGHTS OF WAY.
361238LINED, CL 52 DIP DOMESTIC20
WATER SERVICE LINE. 48" 5. ALL NON-CONDUCTIVE UTILITIES SHALL BE INSTALLED WITH DETECTABLE WARNING
COVER MIN.TAPE OR TRACER WIRE.
37

CITY OF DOVER, DLEAWARE 19901 TOWNSEND, DELAWARE 19734 PROPOSED WATER 6. ALL PIPE LENGTHS AND DISTANCES BETWEEN STRUCTURES ARE MEASURED FROM PROPOSED 8" WATER LATERAL SHUT OFF VALVE (TYP) TO PROPERTY LINE CENTER OF STRUCTURE TO CENTER OF STRUCTURE ALONG A HORIZONTAL PLANE.

  • 7.ALL STORM DRAINAGE PIPE SHALL BE LAID ON SMOOTH CONTINUOUS GRADES WITH PROVIDE MIN. 18" VERTICAL NO VISIBLE BENDS AT JOINTS. SEPARATION ON EXISTING UTILITIES.
  • 8.BEDDING REQUIREMENTS SPECIFIED HEREIN ARE TO BE CONSIDERED AS MINIMUMS FOR RELATIVELY DRY, STABLE EARTH CONDITIONS. ADDITIONAL BEDDING SHALL BE REQUIRED FOR ROCK TRENCHES AND WET AREAS. CONTRACTOR SHALL HAVE THE "NO STOPPING 50.33' RESPONSIBILITY TO PROVIDE SUCH ADDITIONAL BEDDING AS MAY BE REQUIRED TO PROPERLY CONSTRUCT THE WORK STANDING OR GRASS 36 36 GRASS PARKING" 35.37' 9. COMPACTION OF THE BACKFILL OF ALL TRENCHES SHALL BE COMPACTED TO THE 37 GRASS 37 EDGE OF PAVING 37 DENSITY OF 95% OF THEORETICAL MAXIMUM DRY DENSITY (ASTM D698). BACKFILL 38BENCHMARK EOP 38 EOP 38 38 MATERIAL SHALL BE FREE FROM ROOTS, STUMPS, OR OTHER FOREIGN DEBRIS AND 37.47 (PK NAIL) EDGE OF TRAVEL LANE (WHITE STRIPE) SHALL BE PLACED IN LIFTS NOT TO EXCEED 8 INCHES IN COMPACTED FILL KCSDD #24 THICKNESS. CORRECTION OF ANY TRENCH SETTLEMENT WITHIN A YEAR FROM THE 38 RIM 37.51 DATE OF APPROVAL WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. INV. IN 24.82 (12.69 FT DEEP) INV. OUT 24.64 (12.87 FT DEEP) 10. THE CONTRACTOR WILL INSURE THAT POSITIVE AND ADEQUATE DRAINAGE IS

STOP BAR 8" PVC SEWER @ 0.003 FT/FT APPROXIMATE LOCATION PROPOSED INSIDE DROP PROPOSED HYDRANT 8" PVC SEWER @ 0.003 FT/FT APPROXIMATE LOCATION 662' SIGHT TRIANGLE MAINTAINED AT ALL TIMES WITHIN THE PROJECT LIMITS. THIS MAY INCLUDE, BUT NOT CONNECTION. CORE DRILL BE LIMITED TO, REPLACEMENT OR RECONSTRUCTION OF EXISTING DRAINAGE

BAY ROAD EOP INTO EXISTING MANHOLE. EOP STRUCTURES THAT HAVE BEEN DAMAGED OR REMOVED OR REGRADING AS EX. 4" STEEL GAS MAIN, "TURN LANE" REQUIRED BY THE ENGINEER, EXCEPT FOR THOSE DRAINAGE ITEMS SHOWN AT FORM NEW FLOW CHANNEL 38 EOP APPROXIMATE 42" COVER INTO EXISTING FLOW SPECIFIC LOCATIONS AND HAVING SPECIFIC PAY ITEMS IN THE DETAILED ESTIMATE. 38

EX. R/W 200' CHANNEL. "WRONG WAY" (KCR 0007) "CIVIL AIR TERMINAL" NO SEPARATE PAYMENT WILL BE MADE FOR ANY COSTS INCURRED TO COMPLY GRASS "DO NOT ENTER" 37 "TO TOLL NORTH" GRASS WITH THIS REQUIREMENT. VE STA 2+35.89 (MINOR ARTERIAL) PROPOSED JACK AND BORE 'ROUTE 1' ALS BRD BRD BRD GBR O INLET BY R OFF 0.0' "LEFT TURN INLET 'U-TURN' UNDER EXISTING ROADWAY 11. CONTRACTOR MUST APPLY FOR ALL UTILITY CONNECTION APPLICATIONS. 36 H

PROJECT STATUS: ---- UNKNOWN UTILITY

EAYIELD ON8" CARRIER PIPE
GREEN"
D
GRASS
0+001+002+00
"LEFT TURN YIELD ON GREEN" "DO NOT ENTER"TR3+00374+0012" CASING PIPE5+006+007+0012.CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY CONNECTION FEES.
AF
FIC 38 13. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE LOCATION OF

PER DAC COMMENTS/CHECK PRINT SUBMISSION SIG ALL EXISTING UNDERGROUND UTILITIES AND TO TAKE WHATEVER STEPS N EOP NECESSARY TO PROVIDE FOR THEIR PROTECTION. THE ENGINEER HAS DILIGENTLY AL

STOP BAR C ATTEMPTED TO LOCATE AND INDICATE ALL EXISTING FACILITIES ON THESE PLANS; AB LE HOWEVER, THIS INFORMATION IS SHOWN FOR THE CONTRACTOR'S CONVENIENCE

PLOTSTYLE:Pennoni NCS.stb ONLY. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS OF 39 UTILITIES SHOWN OR NOT SHOWN. THE CONTRACTOR SHALL CONTACT THE UTILITY PROPOSED 8" TAPPING COMPANIES FOR EXACT LOCATION OF THEIR UTILITIES PRIOR TO STARTING SLEEVE (POWERSEAL 3490AS CONSTRUCTION. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO

REVISIONS

OR EQ.) AND TAPPING VALVEREPAIR AND REPLACE ANY AND ALL DAMAGE MADE TO UTILITIES BY THE
CONC. G(MUELLER 2360 OR EQ.)12" WATER MAINCONTRACTOR.
UTTER38CONC. GUCITY OF DOVER

REVISED PER COD PW

38TTER
CONC. C38UNKNOWN COVER

REVISED PER KC PW REVISED PER KC PW U CONC. CU 14. THE CONTRACTOR SHALL COORDINATE LOCATION AND INSTALLATION OF ALL RB BAR RB 38 STOP UNDERGROUND UTILITIES AND APPURTENANCES TO MINIMIZE DISTURBANCE TO "DO NOT ENTER" YIELD CURBING, PAVING, AND COMPACTED SUBGRADE. SIGN

FINAL PLANS

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS1701.dwg PLOTTED:5/24/2023 4:46 , PMBY:Andrew Shields UNKNOWN UTILITY GRASS 15. UTILITY COORDINATION SHALL BE INCLUDED IN THE PROJECT SCHEDULE AND IT IS 37

GRASS37THE EXPLICIT RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THAT THE
37PROJECT SCHEDULE INCLUDES THE NECESSARY RELOCATION.THE CONTRACTOR
UNKNOWN UTILITY
WILL NOT BE PAID ADDITIONALLY FOR THIS COORDINATION. THE CONTRACTOR
TRAFFIC SIGNAL POLESHOULD SEEK ASSISTANCE FROM ALL UTILITY COMPANIES TO LOCATE AND
PROTECT THEIR FACILITIES.
UTILITY BOX54321NO.
16. CONTRACTOR SHALL EXCAVATE ONLY AS MUCH TRENCH WHICH PIPE CAN BE
UTILITY POLECHAINLINK FENCEINSTALLED AND TRENCH BACKFILLED BY THE END OF EACH WORK DAY.
36"LAFFERTY LN" "BAY RD" UTILITY POLE

03/14/23 05/12/22 02/17/22 02/11/22 9/24/21 "ONE WAY" DATE 17. ALL UNDERGROUND UTILITY TRENCHES SHALL BE BACKFILLED WITH SAFE CLEAN "DIVIDED HIGHWAY"

LAFF FILL. GUY ANCHOR 18. ALL EXISTING CASTING AND INLET TOPS OR GRATES MUST BE ADJUSTED TO THE ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES GAS WITNESS POST PROPOSED GRADE, UNLESS OTHERWISE INDICATED. ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED (MIN TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON

ERTY
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
MAINTENANCE OF TRAFFIC NOTES:
347)
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
GAS WITNESS POST OR ADAPTATION BY PENNONI ASSOCIATES FOR THE

) (KCR LECTOR SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL TYPICAL APPLICATIONS PER THE DE MUTCD SHALL BE INCORPORATED TO ACHIEVE REQUIRED EXPOSURE TO PENNONI ASSOCIATES; AND OWNER

OL 5 TEMPORARY TRAFFIC CONTROL AND SAFETY REQUIREMENTS. THIS PROJECT IS SUBJECT TO SHALL INDEMNIFY AND HOLD HARMLESS PENNONI

OR C 3 ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND THE FOLLOWING TYPICAL APPLICATIONS UNLESS DIRECTED OTHERWISE BY THE DELDOT EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

LANE DISTRICT SAFETY OFFICER: TYPICAL APPLICATION 33 "STATIONARY LANE CLOSURE ON A MULTI-LANE, DIVIDED HIGHWAY(TA-33). SEE SEPARATE DELDOT ENTRANCE PLANS FOR ADDITIONAL INFORMATION. PROJECT PLAWX21003 DATE 2021-07-14 DRAWING SCALE 1"=30'

DRAWN BY SRA

APPROVED BYGBR
030'60'

CS1701
SHEET 6 OF 14
137

Paj 138

Item 5.

PENNONI ASSOCIATES INC.
V
P CL PLANT SCHEDULE

Christiana Executive Campus

DECIDUOUS TREES QTYBOTANICAL NAMECOMMON NAMESIZEROOT
30"
RC
AR5ACER RUBRUM `AUTUMN FLAME`AUTUMN FLAME RED MAPLE2" - 2.5" CAL.B&BSTRAIGHT SINGLE LEADER
GS13GLEDITSIA TRIACANTHOS `SKYLINE`SKYLINE HONEY LOCUST2" - 2.5" CAL.B&B
LS7LIQUIDAMBAR STYRACIFLUA `ROTUNDILOBA` TM
ROUND-LOBED SWEET GUM2" - 2.5" CAL.B&B

121 Continental Drive, Suite 207

EVERGREEN TREES QTYBOTANICAL NAMECOMMON NAMESIZEROOT
TG19THUJA STANDISHII X PLICATA `GREEN GIANT` GREEN GIANT ARBORVITAE6`-7` HT.CONT.FULL FORM TO GROUND
39EXISTING HW

Newark, DE 19713-4310

INV IN 30.38FLOWERING TREES QTYBOTANICAL NAMECOMMON NAMESIZEROOT
AC4AMELANCHIER CANADENSISCANADIAN SERVICEBERRY8`-9` HT.B&B
CV6CRATAEGUS VIRIDIS `WINTER KING`WINTER KING HAWTHORN8`-9` HT.B&B

T 302.655.4451 F 302.654.2895

38SHRUBSQTYBOTANICAL NAMECOMMON NAMESIZEROOTHEIGHTREMARKS
IC82ILEX CRENATA `COMPACTA`DWARF JAPANESE HOLLY5 GAL.CONT.18" - 24"MIN. 3 STEMS
50IV46ITEA VIRGINICA `HENRY`S GARNET`HENRY`S GARNET SWEETSPIRE 5 GAL.CONT.18" - 24"MIN. 3 STEMS
3145RG34RHUS AROMATICA `GRO-LOW`GRO-LOW FRAGRANT SUMAC 2 GAL.CONT.12" - 15"MIN. 3 STEMS
40
THL
32E S AND35
TA S
(Ri TE O N/F O
33ght F D F
-of-
Wa ELAW(OTRO
UT

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR

  • y)AR HE R E1
EEX
PLANTING NOTES AND SPECIFICATIONS
34
STORMWATER BASINPR
35
33ES
36BOTTOM ELEV. 26.00SW
8,304 SF BOTTOMEDAY
GS&F
34EO
FP RE 1. ALL TOPSOIL SHALL BE A MINIMUM 4” IN ALL SOD AREAS, 6" IN SEEDED AREAS AND 8” IN TREE, SHRUB
LANDS N/F OFAVEWAND GROUND COVER BEDS, INCLUDING PARKING LOT ISLAND BEDS.
36INGAY
THE STATE35)
(1) OF
GSDELAWARE
(Right-of-way) 2. PLANTING BEHIND PERPENDICULAR PARKING IS TO BE LOCATED A MINIMUM OF 5' BEHIND THE CURB

AND OWNER MUST BE NOTIFIED OF ANY

Zoning N/A 28 NO LINE. RTH 35 36 3. ALL LANDSCAPE AND GRASS AREAS ARE TO BE HAND RAKED AND LEFT CLEAR OF ALL STONES, ROCK, 35 CONSTRUCTION DEBRIS AND ANY UNSUITABLE MATERIALS.

  • 4.LANDSCAPE CONTRACTOR WILL LOCATE ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION AND PLANTING INSTALLATION. 37 37 34
  • 5.ALL PROPOSED LANDSCAPING TO BE NURSERY GROWN, TYPICAL OF THEIR SPECIES OR VARIETY.

DISCREPANCIES BEFORE PROCEEDING WITH WORK 36 THEY ARE TO HAVE NORMAL VIGOROUS ROOT SYSTEMS, FREE FROM DEFECTS AND INFECTIONS AND

(1) GSIN ACCORDANCE WITH ANSI Z60.1
VANRE
(1) GS35FU
SE35
17 33 6. ALL PROPOSED PLANTINGS SHOULD BE INSTALLED PER STANDARDS OF THE AMERICAN NURSERY AND
35 LANDSCAPE ASSOCIATION, LATEST EDITION, AND STATE NURSERY/ LANDSCAPE ASSOCIATIONS WITH
REGARD TO PLANTING, PIT SIZE, BACKFILL MIXTURE, STAKING AND GUYING.
  • 7.ALL PLANTING CONTAINERS AND BASKETS SHALL BE REMOVED DURING PLANTING. ALL PLANTS SHALL (7) LS BE SET PLUMB AND POSITIONED SO THAT THE TOP OF THE ROOT COLLAR MATCHES, OR IS NO MORE THAN TWO (2”) INCHES ABOVE, FINISHED GRADE. REPLACE AMENDED BACKFILL IN 6-INCH LAYERS AND 8 COMPACT BACKFILL TO ELIMINATE VOIDS. CONTRACTOR SHALL PROVIDE A FOUR-INCH HIGH EARTHEN (15) RG 3 3 WATERING SAUCER ALONG THE PERIMETER OF EACH PLANTING PIT. CONTRACTOR SHALL WATER 36 35 NEWLY PLANTED VEGETATION PRIOR TO MULCHING PLANTING PIT. ALL VOIDS SHALL BE FILLED AND 36 SETTLING MITIGATED AS REQUIRED.

(4) IC (8) IC (4) IC (8) IC (4) IC

35 (4) IC 34 (2) AR 8. AFTER INITIAL WATERING AND PRIOR TO MULCHING, CONTRACTOR SHALL APPLY HERBICIDES AND 34 PRE-EMERGENT HERBICIDES AS REQUIRED TO ELIMINATE ANY WEED SEEDS OR PLANTS PRESENT ON ROOT BALL. (2) AR TH 9. ALL PLANTING BEDS AND PITS SHALL BE MULCHED WITH DOUBLE GROUND HARDWOOD MULCH AT A (5) IC 3-STORY, 54-UNIT APARTMENT BUILDING (5) IC F W O LA MINIMUM DEPTH OF 3”. 22 /F E y) 19,771 SF FOOTPRINT 35 (1) AR N D a S F -W D O f 10. SEEDBED PREPARATION: N TE t-o 59,313 GFA PROPOSED LA TA igh

BAY POINTE APARTMENTS SANITARY S (R FFE=38.60 E A. APPLY LIMESTONE AND FERTILIZER ACCORDING TO SOIL TESTS OR FERTILIZER MAY BE APPLIED AT

PATEL HOSPITALITY PROPERTIES

CLEANOUT35
A R THE RATE OF 260 POUNDS PER ACRE OR 6 POUNDS PER 1000 SQUARE FEET USING 10-20-10 OR
(TYP.) 36 EQUIVALENT. IN ADDITION, 300 POUNDS 4-1-2 PER ACRE OR EQUIVALENT OF SLOW RELEASE NITROGEN
E
36MAY BE USED IN LIEU OF TOP DRESSING.

LANDSCAPE PLAN 14

BAY ROAD (8) IC (4) IC (8) IC (4) IC

3171 DUPONT PARKWAY (8) IC 36 B. WORK LIME AND FERTILIZER INTO THE SOIL AS PRACTICAL TO A DEPTH OF 4-INCHES WITH A DISC, (1) GS SPRING TOOTH HARROW OR OTHER SUITABLE EQUIPMENT. THE FINAL HARROWING OR DISKING 36 37 OPERATION SHOULD PARALLEL TO THE GENERAL CONTOUR. CONTINUE TILLAGE UNTIL A REASONABLE 10 UNIFORM, FINE SEEDBED IS PREPARED. ALL BUT CLAY OR SILTY SOILS AND COARSE SANDS SHOULD BE ROLLED TO FIRM THE SEEDBED WHEREVER FEASIBLE. 36 36 C. INSPECT SEEDBED JUST BEFORE SEEDING. IF TRAFFIC HAS LEFT THE SOIL COMPACTED, THE AREA 37 (1) GS MUST BE RETILLED AND FIRMED AS OUTLINED BELOW.

CITY OF DOVER, DLEAWARE 19901 TOWNSEND, DELAWARE 19734

MULCHED LANDSCAPE(3) IV37
BED TYP. (1) AC (19) RG 36 D. IN AREAS DESIGNATED AS SOD, FESCUE SOD IS TO BE INSTALLED ON MINIMUM 4” TOPSOIL. AREAS TO
(2) TG(1) GS36BE SODDED ARE TO BE PREPARED AS NOTED ABOVE FOR SEEDED AREAS.
(1) GS37(3) IV(5) IV
(3) IV(3) IV 37(2) TG
(1) CV 37 12. TOPSOIL WITH A QUALITY ORGANIC SOIL AMENDMENT SHALL BE USED FOR ALL PLANTING AND
(1) TG(8) ICSEEDING OPERATIONS.
361238(1) GS(1) AC
(3) IV20
13. NOTIFY ALL UTILITY COMPANIES AND LOCATE ALL UTILITIES PRIOR TO EXCAVATING PLANT PITS.
(5) TG PLANT LOCATIONS MAY BE ADJUSTED IN THE FIELD TO AVOID INTERFERENCE WITH UNDERGROUND
37UTILITIES.
37
(1) GS37
(8) IV 37 14. SHOULD ANY DISCREPANCY ARISE BETWEEN THE PLANTING PLAN AND THE PLANTING SCHEDULE, THE
37
PLAN SHALL GOVERN AS TO THE QUANTITY OF PLANT MATERIAL.
38
(1) AC (1) GS (1) GS 37 (1) GS (1) GS 15. ALL SHADE TREES TO BE PRUNED OF SIDE BRANCHES TO A HEIGHT OF 6' ABOVE GRADE EXCEPT
(1) AC(3) TG(2) TG(9) IV(3) CV(2) TG
(2) CV(3) IV38
(2) TG
38WHERE NOTED IN PLANT SCHEDULE.
38131.86'64.93'369.00'
S 21°36'00" E S 21°36'00" E S 21°36'00" E 37 16. ALL PLANT MATERIAL SHALL BE APPROVED UPON ARRIVAL TO THE SITE, UNLESS OTHERWISE
37(6)37IVNOTIFIED.
50.33'
3738
36"NO STOPPING
37 STANDING OR 17. PROPOSED PLANT MATERIAL MAY BE SUBSTITUTED BY SIMILAR PLANTS PRIOR TO INSTALLATION,

36 36 GRASS 37 GRASS PARKING" 35.37' SUBJECT TO APPROVAL BY THE LANDSCAPE ARCHITECT AND NEW CASTLE COUNTY. 37 37 EDGE OF PAVING 38 38 38 18. DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO WORK AREA CONTRACTOR IS 38 EOP 38 38 38 RESPONSIBLE FOR FINE GRADING AND SEEDING ALL DISTURBED AREAS. EDGE OF TRAVEL LANE (WHITE STRIPE) 19. ALL PLANTS SPACED 7' O.C. OR CLOSER SHALL BE IN CONTINUOUS MULCHED BEDS.

  • 20.SEED ALL DISTURBED AREAS WITH GRASS SEED MIX SPECIFIED IN SEDIMENT CONTROL ALS BRD BRD GBR BY

PROJECT STATUS:
----
662' SIGHT TRIANGLE
STOP BAR
REQUIREMENTS.

  • 21.ALL PLANT MATERIAL SHALL BE WARRANTED AGAINST DEATH AND UNSATISFACTORY GROWTH FOR A

BAY ROAD EOP EOP MINIMUM PERIOD OF TWO YEARS AFTER THE DATE OF WRITTEN FINAL ACCEPTANCE BY THE "TURN LANE" 38 LANDSCAPE ARCHITECT AND/OR OWNERS REPRESENTATIVE. ANY PLANT MATERIAL THAT DIES OR EOP PERFORMS POORLY DURING THE WARRANTY PERIOD SHALL BE PROMPTLY REMOVED AND REPLACED 38

EX. R/W 200' "WRONG WAY" (KCR 0007) "CIVIL AIR TERMINAL" IN KIND.

PLOTSTYLE:Pennoni NCS.stb
GENERAL LANDSCAPE NOTES:

PER DAC COMMENTS/CHECK PRINTS 1. ALL NEW TREES SHALL HAVE A ONE YEAR REPLACEMENT GUARANTEE. LANDSCAPE MAINTENANCE NOTES

REVISIONS 2. SEE LANDSCAPE DETAILS SHEET FOR LANDSCAPE PLANTING NOTES, SPECIFICATIONS AND INSTALLATION DETAILS.

REVISED PER COD PW ANY AND ALL PLANT MATERIAL THAT DIES OR FAILS TO THRIVE SHALL BE IMMEDIATELY REPLACED WITH

REVISED PER KC PW 3. ONLY PRUNE OR REMOVE EXISTING TREES WHERE REQUIRED TO CONSTRUCT IMPROVEMENTS. LIKE SPECIES. RECOMMENDED ANNUAL MAINTENANCE OF SITE VEGETATION TO INCLUDE BUT NOT BE 4. NO PLANTINGS SHALL BE PLANTED CLOSER THAN TEN FEET (10') TO UTILITIES. LIMITED TO:

FINAL PLANS

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS2001.dwg PLOTTED:5/24/2023 4:46 , PMBY:Andrew Shields 1. FERTILIZER: MOW LAWN - FERTILIZE TWICE PER YEAR.

NOTE: 2. PRUNING: PRUNING SHALL BE LIMITED OR REMOVAL OF DEAD WOOD OR BRANCHES FOR TREES OR 1) HAND LOOSEN ROOTS OF FOR SIGHT DIFFERENCES/SAFETY REASONS. PRUNING OF SHRUBS AND TREES SHALL BE LIMITED TO CONTAINERIZED MATERIAL (TYP.) THE PRUNING NECESSARY TO MAINTAIN THE NATURAL SHAPE OF THE PLANT EXCEPT FOR SHEARED

PLANT AT SAMEHEDGES.
DEPTH AS NURSERY15" MIN.4321NO.
2) SCARIFY BOTTOM AND SIDES OF 3. PEST CONTROL: PRE-EMERGENT WEED CONTROL FOR MOWN LAWNS AND SHRUB BEDS MAY BE
HOLE PRIOR TO PLANTING APPLIED IN FEBRUARY. CHEMICAL TREATMENT FOR INSECT INFESTATION AND DISEASE MAY BE
COMPLETELY REMOVE
APPLIED AND SHALL BE SPECIFIC TO THE PROBLEM.

03/14/23 02/17/22 02/11/22 WIRE CAGE AND 9/24/21 DATE REMOVE BURLAP FROM BALL. IF WRAP SHRUBS TO SIT ON SUBGRADE 4. MULCHING: MULCHING SHALL BE MAINTAINED AT A DEPTH OF 3” IN PLANT BEDS AND AROUND BASE IS SYNTHETIC OR TREATED OF TREES. (NONBIODEGRADABLE) MULCH - 3" DEEP ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES REMOVE COMPLETELY. 5. MOWING: MOWN LAWN SEED MIX SHALL BE MOWN AT REGULAR INTERVALS THROUGHOUT THE ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE GROWING SEASON. GRASS HEIGHT SHOULD NOT EXCEED 3 INCHES. MOWER BLADES SHALL BE SET PROJECT. THEY ARE NOT INTENDED OR REPRESENTED AND 2-1/2 INCHES UNLESS OTHERWISE DIRECTED. WHERE APPLICABLE, RAIN GARDEN AND/OR TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON

TOPSOIL PLANTING SOIL MEADOW SEED MIXES SHALL BE MOWN ONLY ONCE YEARLY IN LATE WINTER. THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER 3" MIN. LAYER OF MULCH PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION EDGER OR ADAPTATION BY PENNONI ASSOCIATES FOR THE 6"± 6. PLANT PROTECTION: AVOID EXCESS INTRUSION INTO THE ROOT ZONE AREA OF ESTABLISHED SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS TOPSOIL PLANTINGS. SOLE RISK AND WITHOUT LIABILITY OR LEGAL FINISHED GRADE EXPOSURE TO PENNONI ASSOCIATES; AND OWNER REFER TO PLAN FOR GROUND COVER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI 7. WATERING: UNLESS STATED OTHERWISE IN THESE DOCUMENTS, PROVIDE APPROXIMATELY 1-INCH ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND

DEPTH OF RAINFALL/WATER PER WEEK THROUGHOUT THE GROWING SEASON FOR THE FIRST YEAR. EXPENSES ARISING OUT OF OR RESULTING THEREFROM. SUBGRADE OF BALL PROJECT PLAWX21003 DATE 2021-07-14 CENTERING OF SHRUB IN BED TO TAKE PRECEDENCE OVER DIMENSION FROM DRAWING SCALE 1"=30' SUBGRADE BALL DIA. EDGE. 2 x BALL DIA. DRAWN BY SRA

APPROVED BY GBR

DETAIL- TREE PLANTING
CS2001
DETAIL- SHRUB PLANTING
N.T.S. N.T.S. 0 30' 60'

SHEET 7 OF 14 138

Paj 139

Item 5.

PENNONI ASSOCIATES INC. EXISTING HW Luminaire Schedule INV IN 30.38 Fixture Type Qty Fixture Description Mounting Height Manufacturer Catalog Number LLF Total Watts Delivered Lumens Photometric File Name

Christiana Executive Campus

P4WA 9 AREA LIGHT, TYPE 4 WIDE WITH INTERNAL PACKLIGHT CONTROL 20 Feet Hubbell Lighting Inc VP-S-60L-136-3K7-4W-BC 0.900 133.506 8498 VP-S-60L-136-3K7-4W-BC.ies

121 Continental Drive, Suite 207

P5W 3 AREA LIGHT, TYPE 5 WIDE 20 Feet Hubbell Lighting Inc, dba Beacon Product VP-S-60L-136-3K7-5W 0.900 134.793 13495 VP-S-60L-136-3K7-5W.ies TH E S LAND TA S (Ri TE O N/F O RO Newark, DE 19713-4310 ght F D F -of- Wa ELAW (OT y) AR HE RE UT E1 E XP LIGHTING NOTES: RE

T 302.655.4451 F 302.654.2895 STORMWATER BASIN P4W BOTTOM ELEV. 26.00 A SS W AY 1. ALL NEW SITE LIGHTING SHALL OPERATE DAILY ON A DUSK TO DAWN BASIS. LIGHTS WILL BE 8,304 SF BOTTOM MH: 2 ED S& 0 GE CONTROLLED BY PHOTOCELL AND/OR ASTRONOMIC TIME CLOCK AND POWERED FROM THE NEW OF FR PA EE BUILDING ELECTRIC SERVICES. LANDS N/F OF VIN WA THE STATE OF DELAWARE Y) G (Right-of-way) Zoning N/A 28 NO

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR
RTH
P4
WA M WA
P4 : 20 H : 20
MH

AND OWNER MUST BE NOTIFIED OF ANY
VAN RE
FU
SE
17
0.5 FOOT CANDLE (TYP)

1.0 FOOT CANDLE (TYP)

P4W P4W 8

DISCREPANCIES BEFORE PROCEEDING WITH WORK A A MH : 20 MH : 20

P5W
MH : 20
TH

P4WF W
A3-STORY, 54-UNIT APARTMENT BUILDINGO LA
MH:22/F E y)
N D a
2019,771 SF FOOTPRINTS F -W
D O f
N TE t-o
59,313 GFALA TA igh
S (R
E
0.5 FOOT CANDLE (TYP)AR
E
1.0 FOOT CANDLE (TYP)14

P5W
MH 10
: 20

BAY POINTE APARTMENTS PATEL HOSPITALITY PROPERTIES BAY ROAD

LIGHTING PLAN 3171 DUPONT PARKWAY

12P5W
20
MH : 20
P4W
MHA

CITY OF DOVER, DLEAWARE 19901
TOWNSEND, DELAWARE 19734
: 20 P4W
MH A
: 20 P4W
MH A
: 20

"NO STOPPING

35.37'
STANDING OR
PARKING"

GRASSGRASS
EDGE OF PAVING
38EOP
383838
EDGE OF TRAVEL LANE (WHITE STRIPE)

STOP BAR 662' SIGHT TRIANGLE

BAY ROAD
EOP
"TURN LANE"
38
EOP

ALS BRD BRD GBR BY

PROJECT STATUS: ----

PLOTSTYLE:Pennoni NCS.stb

PER DAC COMMENTS/CHECK PRINTS REVISIONS

REVISED PER COD PW REVISED PER KC PW FINAL PLANS

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS2201.dwg PLOTTED:5/24/2023 4:47 , PMBY:Andrew Shields 4 3 2 1 NO.

03/14/23 02/17/22 02/11/22 9/24/21 DATE

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

PROJECT PLAWX21003 DATE 2021-07-14 DRAWING SCALE 1"=30'

LIGHT POLE FOUNDATION AND MOUNTING DETAIL DRAWN BY SRA

APPROVED BY GBR

030'60'
CS2201
SHEET8OF 14
139

Paj 140

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS4001.dwg PLOTTED:5/24/2023 4:48 , PMBY:Andrew Shields PLOTSTYLE:Pennoni NCS.stb PROJECT STATUS: ----

253040
253040
-1+00
-1+00

I-99 30 L X 48 W

I-201GRATE 35.95
GRATE 36.36INV OUT 33.09 (I-100 TO I-99)
INV OUT 33.00 (S)
36.6STA 0+00
37.5STA 0+000+0036.63ELEV 36.63
0+0037.54ELEV 37.54

I-202
GRATE 36.42
INV IN 32.82 (I-202 TO I-201)

INV OUT 32.82 (I-203 TO I-202)36.4
37.0
36.41EXISTING 8" DIA. SANITARY
37.00
EXISTING 4" STEEL NATURAL GAS MAIN

SEWER INV. AT CROSSING CONTRACTOR TO CONFIRM COVER AT 112 LF 15" HDPE @ 0.0

35 LF 15" HDPE @ 0.005 FT/FT 05 FT/FT

25.97±
CROSSING AND MAINTAIN 18" MIN.

I-100 30 L X 48 W

35.8GRATE 35.85
38.3STA 1+01.94INV IN 32.53 (I-100 TO I-99)
1+0035.83
CLEARANCE.
1+0038.34INV OUT 32.25 (I-101 TO I-100)
ELEV 38.42
STA 1+12.13
ELEV 35.52
137 LF 15" HDPE @ 0.0

05 FT/FT

54 LF 15" HDPE @ 0.0

35.2
37.5
35.21
37.47 05 FT/FT

I-101
GRATE 35.25
I-203 INV IN 31.98 (I-101 TO I-100)
GRATE 36.26 INV OUT 31.73 (I-102 TO I-101)
INV IN 32.14 (I-203 TO I-202)
INV IN 32.14 (I-203 TO I-302)
INV OUT 32.14 (I-204 TO I-203)

34.3

36.8I-102
STA 2+03.97
2+0034.27GRATE 35.45
2+0036.78
INV IN 31.15 (I-102 TO I-103)
53 LF 18" HDPE @ 0.0

ELEV 36.71 INV IN 31.46 (I-102 TO I-101) 05 FT/FT

STA 2+19.99 INV OUT 31.40 (I-104 TO I-102)
I-204
ELEV 34.10
GRATE 35.41
INV IN 31.98 (I-204 TO I-203)
INV OUT 31.73 (I-205 TO I-204)
SOUTHERN STORM SEWER NORTHERN STORM SEWER

33.3
35.8
33.26
35.80 HORIZONTAL SCALE: 1" = 30'
HORIZONTAL SCALE: 1" = 30'

EX. GRADE
EX. GRADE EX. GRADE PRO. GRADE
VERTICAL SCALE: 1" = 3'
125 LF 18" HDPE @ 0.0

VERTICAL SCALE: 1" = 3' 163 LF 18" HDPE @ 0.0

32.6

35.03+0032.5905 FT/FT
3+0035.0405 FT/FT

STA 3+26.86 ELEV 32.33

I-104 24 L X 30 W

32.4GRATE 35.70
34.5INV IN 30.78 (I-104 TO I-102)
STA 3+53.7332.40
34.53INV OUT 30.28 (DMH-105 TO I-104)
ELEV 34.49

I-205
GRATE 34.80
INV IN 30.91 (I-205 TO I-204)
INV OUT 30.91 (I-206 TO I-205)
48 LF 18" HDPE @ 0.005 FT/FT
73 LF 24" HDPE @ 0.005

I-20632.6
35.3GRATE 34.80
FT/FT
4+0032.64
4+0035.28INV IN 30.67 (I-206 TO I-205)
INV OUT 30.67 (I-207 TO I-206)
15 LF 18" HDPE @ 0.005 FT/FT

STA 4+17.59 DMH-105 60" MANHOLE RIM 36.22 ELEV 32.71 INV IN 29.93 (DMH-105 TO I-104) INV IN 30.17 (DMH-105 TO I-45) I-207 INV IN 28.67 (DMH-105 TO I-46) GRATE 34.64 39 LF 18" HDPE @ 0.005 FT/FT

INV OUT 29.71 (OS-1 TO DMH-105) INV IN 30.60 (I-207 TO I-206) INV OUT 30.60 (DMH-208 TO I-207)

34.3
34.32 STA 4+55.90
ELEV 34.29

STA 4+69.11 DMH-208 60" MANHOLE
ELEV 34.14 GRATE 35.45
INV IN 30.40 (DMH-208 TO I-207)
INV OUT 28.67 (I-47 TO DMH-208)
INV OUT 30.45 (I-48 TO DMH-208)

5+00
5+00

UNDERGROUND

UNDERGROUND STORMWATER

STORMWATER SYSTEM

SYSTEM

6+00

6+00253040
253040
HV
00

30' 3'

60' 6'

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR DATE ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES AND OWNER MUST BE NOTIFIED OF ANY ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE BAY POINTE APARTMENTS DRAWN BY PROJECT DISCREPANCIES BEFORE PROCEEDING WITH WORK PROJECT. THEY ARE NOT INTENDED OR REPRESENTED BAY ROAD SHEET APPROVED BY TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON CITY OF DOVER, DLEAWARE 19901 DRAWING SCALE

THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER

PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION03/14/234FINAL PLANSALS
9OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
UTILITY PROFILES
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
02/17/223REVISED PER COD PWBRD

SOLE RISK AND WITHOUT LIABILITY OR LEGAL

PENNONI ASSOCIATES INC.
02/11/22 2 REVISED PER KC PW BRD Christiana Executive Campus
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER

SHALL INDEMNIFY AND HOLD HARMLESS PENNONI

PATEL HOSPITALITY PROPERTIES 121 Continental Drive, Suite 207 OF 14 9/24/21 1 PER DAC COMMENTS/CHECK PRINT SUBMISSION GBR ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND 3171 DUPONT PARKWAY Newark, DE 19713-4310 CS4001 GBR BRD AS NOTED PLAWX21003 2021-07-14 EXPENSES ARISING OUT OF OR RESULTING THEREFROM. DATE NO. REVISIONS BY TOWNSEND, DELAWARE 19734 T 302.655.4451 F 302.654.2895 140 Item 5.

Paj 141

Item 5.

PENNONI ASSOCIATES INC.

Christiana Executive Campus

121 Continental Drive, Suite 207

Newark, DE 19713-4310

T 302.655.4451 F 302.654.2895
CO-1 CLEANOUT WITH TRAFFIC RATED LID

KCSDD #24 CO-2 CLEANOUT WITH TRAFFIC RATED LID 41.15' CARTWAY 33.84' MEDIAN 46.16' CARTWAY

RIM 38.50 40 40

RIM 37.48

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR RIM 38.41 PRO. GRADE

INV IN 31.20 (CO-1 TO CO-2) INV IN 32.85 (CO-2 TO ) EX. GRADE

INV IN 30.94 (KCSDD #24 TO CO-1) EXISTING 4" STEEL NATURAL GAS MAIN

INV OUT 31.20 (KCSDD #24 TO CO-1) CONTRACTOR TO CONFIRM

INV OUT 32.85 (CO-1 TO CO-2) EX. 12"

AND OWNER MUST BE NOTIFIED OF ANY
WATER COVER AT CROSSING AND
MAIN MAINTAIN 18" MIN. 8" GATE
8" CEMENT LINED, CL VALVE
52, DIP WATER MAIN CLEARANCE.
48" COVER MIN. 58 LF 12" CASING

40 PROPOSED
40
12" X 8" BUILDING ADJUST RIM TO
8" CEMENT LINED, CL 52, DIP
TAPPING FFE 38.60 FINAL GRADE
WATER MAIN CONT. TO SPRINKLER PRO. GRADE

DISCREPANCIES BEFORE PROCEEDING WITH WORK

SLEEVE 8" 45° BEND ROOM, 48" COVER MIN.
53 LF 12" CASING
8'' x 8'' x 6" EX. GRADE
TEE

8" 45° BEND 8" 45° BEND

3030EXISTING 4" STEEL NATURAL GAS MAIN
8" 45° BENDCONTRACTOR TO CONFIRM COVER AT
CROSSING AND MAINTAIN 18" MIN.
CLEARANCE.

20 FT X 10 FT JACKING PIT 10 FT X 10 FT RECEIVING PIT 3.04' EASEMENT PROPERTY LINE EXISTING 8" DIA. SANITARY SEWER INV. AT CROSSING 102 LF 8" SD 25.25± R-35 @ PROPOSED INV. 30.94 0.020 25 25 INV. AT FT/FT BUILDING 32.98± 36.5 30 30 36.45

BAY POINTE APARTMENTS PATEL HOSPITALITY PROPERTIES -0+50 0+00 1+00 2+00 2+50

UTILITY PROFILES BAY ROAD REFER TO KENT EX. 8" SANITARY

3171 DUPONT PARKWAY
WATER MAIN EXTENSION COUNTY DETAIL
SS-21, FOR INSIDE
SEWER BEHIND

HORIZONTAL SCALE: 1" = 30' DROP CONNECTION

VERTICAL SCALE: 1" = 3'

CITY OF DOVER, DLEAWARE 19901
TOWNSEND, DELAWARE 19734
RECONSTRUCT
CHANNEL AS REQUIRED EASEMENT
BY KENT COUNTY
DETAIL SS-21

PROPERTY LINE

20 20

38.4
38.42

-0+50 0+00 1+00 1+50

SANITARY 1 4+00 HORIZONTAL SCALE: 1" = 30' VERTICAL SCALE: 1" = 3'

ALS ALS BRD BRD GBR BY

PROJECT STATUS: ----

PER DAC COMMENTS/CHECK PRINT SUBMISSION

PLOTSTYLE:Pennoni NCS.stb

REVISED PROFILE DETAIL LABEL REVISIONS

REVISED PER COD PW REVISED PER KC PW FINAL PLANS

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS4002.dwg PLOTTED:5/24/2023 4:48 , PMBY:Andrew Shields 5 4 3 2 1 NO.

03/14/23 10/03/22 02/17/22 02/11/22 9/24/21 DATE

ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

PROJECT PLAWX21003 DATE 2021-07-14 DRAWING SCALE AS NOTED

DRAWN BY BRD

APPROVED BYGBR
03'6'
V
030'60'
CS4002
HSHEET10OF 14
141

Paj 142

Item 5.
30"

PENNONI ASSOCIATES INC.
LIGHT DUTY HEAVY DUTY
LIGHT DUTY HEAVY DUTY 6" 4,000 PSI CONCRETE, MAX W/C 0.45,

Christiana Executive Campus
MAX. SLUMP W/O ADMIXTURE: 5" CONTROL JOINTS 10 FT OC, 2" DEPTH.
REFER TO SAFETY EDGE DETAIL (TYP.) 1.25" DELDOT TYPE C ASPHALT OVER
BROOM FINISH EXPANSION JOINTS 20 FT OC, 0.25" THICK
1.5" DELDOT TYPE C ASPHALT 8" DELDOT GABC
1.5" DELDOT TYPE C ASPHALT 6" x 6" W2.0x2.0 WWF
4" DELDOT TYPE B ASPHALT 8" 4,000 PSI CONCRETE, MAX W/C 0.45,

121 Continental Drive, Suite 207
6" DELDOT GABC
3" DELDOT TYPE B ASPHALT MAX. SLUMP W/O ADMIXTURE: 5"
8" DELDOT GABC SUBGRADE COMPACTED TO 95%

STOP

BROOM FINISH

8" DELDOT GABC OF ASTM D 1557 (TYP.) MANUAL ON UNIFORM TRAFFIC
CONTROL JOINTS 10 6" x 6" W2.0x2.0 WWF
CONTROL DEVICES STANDARD

Newark, DE 19713-4310 SUBGRADE COMPACTED TO 95% FT OC, 1.5" DEPTH. SIGN FACE #R7-8. MOUNT SIGN OF ASTM D 1557 (TYP.) EXPANSION JOINTS A MINIMUM OF 60 INCHES FROM 30" 20 FT OC, 0.25" THICK NOTES: BOTTOM OF SIGN TO FINISHED PARKING T 302.655.4451 F 302.654.2895 1. THE SIGN SHALL HAVE A WHITE SCOTCHLITE GRADE. BACKGROUND WITH RED SCOTCHLITE LETTERS EXCEPT FOR THE WORD "NO" WHICH SHALL HAVE COLOR SCHEME REVERSED. 2. ALL LETTERING SHALL BE 3" IN HEIGHT EXCEPT FOR THE WORD "PARKING" WHICH SHALL BE 2" IN HEIGHT. MOUNT ABOVE FINISHED GRADE NO HIGHER THAN 8 FEET.

FIRE
ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR
NOTES:
1. SIGN SHALL BE MANUFACTURED AND PROVIDED PER DIMENSIONAL
AND COLOR STANDARDS AS SET FORTH IN THE MUTCD, LATEST

LANE

MATCH COLOR, LETTER STYLE AND EDITION. NOTES: NOTES: GENERAL SIGN DESIGN WITH MUTCD #R7-8 (INCLUDE 12" x 6" VAN 2. MOUNT SIGN TO BREAK AWAY POST A MINIMUM OF 7'-0" ABOVE FINISHED GRADE TO BOTTOM EDGE OF SIGN. 1. ALL PAVED AREAS SHALL BE PROOF ROLLED IN THE PRESENCE OF SITE ENGINEER 1. ALL PAVED AREAS SHALL BE PROOF ROLLED IN THE PRESENCE OF SITE ENGINEER SIGN WHERE INDICATED ON THE

AND OWNER MUST BE NOTIFIED OF ANY DRAWINGS) 3. LOCATE SIGN PER LOCATIONS SHOWN ON SITE PLAN. SIGN SHALL OR INDEPENDENT GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT OF OR INDEPENDENT GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT OF BE PLACED A MINIMUM OF 2'-0" FROM WALKWAYS AND CARTWAYS AGGREGATE. FROM THE OUTER EDGE OF THE SIGN. AGGREGATE.

ASPHALT PAVEMENT DETAILCONCRETE PAVEMENT DETAILSIGN - FIRE LANESIGN - ACCESSIBLE PARKINGSIGN - STOP
1N.T.S.
2N.T.S.
3N.T.S.
4N.T.S.
5N.T.S.

DISCREPANCIES BEFORE PROCEEDING WITH WORK 1 1/2"

8" O.D. SCH. 40 STEEL PIPE CROWN TOP
FLUSH WITH ADJACENT PAINT INDUSTRIAL YELLOW
PAVEMENT SURFACE TOP OF CURB
WITH 2 COATS EXTERIOR PAINT

NOTE: EXPANSION JOINTS 1/2" WIDE SHALL BE INSTALLED IN THE CURB 20' FILL WITH 3000 PSI APART & FILLED WITH CELLULAR CONCRETE COMPRESSION MATERIAL AS SPECIFIED & RECESSED FROM FACE & TOP OF CURB. CONTRACTION JOINTS SHALL BE PROVIDED MIDWAY BETWEEN EACH 48" EXPANSION JOINT PMF EXPANSION JOINT

UPRIGHT CURB (ON-SITE) DEPRESSED CURB (ON-SITE) 6

BAY POINTE APARTMENTS N.T.S. 7

PATEL HOSPITALITY PROPERTIES N.T.S.

BAY ROAD 3171 DUPONT PARKWAY

SITE DETAILS 48"

PROPOSED CURB

CITY OF DOVER, DLEAWARE 19901
TOWNSEND, DELAWARE 19734
EXPANSION JOINT
HEAVY DUTY CONC. PAD 3000 PSI
CONCRETE FOOTING
24"

BOLLARD DETAIL 8 N.T.S.

10' DUMPSTER DUMPSTER DUMPSTER
8' TALL WOOD
BOLLARD PRIVACY FENCE
1'

27' OVERALL

9' 9' 9'
8' TALL - DOUBLE
LEAF SWING
GATE TO MATCH
FENCE. ALS BRD BRD BY

PROJECT STATUS: ----

TRASH ENCLOSUREON SITE ADA RAMPS
109N.T.S.
N.T.S.
VARIES

PLOTSTYLE:Pennoni NCS.stb
1 / 4" PREMOLDED EXPANSION
JOINT MATERIAL

REVISIONS VARIES 1 / 8" RADIUS (TYP.)

REVISED PER COD PW ALL JOINTS

REVISED PER KC PW CONTROL JOINT

FINAL PLANS

± 1 / 8" WIDE x

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS6001.dwg PLOTTED:5/24/2023 4:49 , PMBY:Andrew Shields 1" DEEP 1 / 4"

GALV. POST CAP 8.0'

CENTER TO CENTER POSTS

2 1/2" DIA. GALVANIZED METAL 2 1/2" DIA. GALVANIZED METAL

JOINTS 4 3 2 NO. ATTACH WOOD RAILS TO POST (0.20 WALL THICKNESS) POST (0.20 WALL THICKNESS) GALVANIZED 2 1/2 LB/FT U POSTS WITH GALVANIZED POST 1"x6" PRESSURE TREATED 1"x6" PRESSURE TREATED CHANNEL POST - 10 FT LENGTH STRAP BRACKET 03/14/23 02/17/22 02/11/22 20 FT MAXIMUM BOARDS WITH 3 4" OVERLAP BOARDS WITH 3 4" OVERLAP EXPANSION JOINT SPACING DATE

7' MIN. 4" CONCRETE, CLASS B 2"x4" PRESSURE TREATED BROOM FINISH 2"x4" PRESSURE TREATED HORIZONTAL RAIL (TYP. OF 3) EXPANSION 6" X 6" W2.0X 2.0 WWF HORIZONTAL RAIL (TYP. OF 3) BREAK-AWAY POST EXPANSION ON-SITE ONLY ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES 8.0' HOLD 1"x6" PRESSURE TREATED 8.0' JOINT JOINT 4" GABC, COMPACTED ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED 2" TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON BOARDS 2" ABOVE THE GROUND TO POST THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER ALLOW DRAINAGE TO PASS HIN 50:1 MAX. OVERLAP X. WIT PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION HOLD 1"x6" PRESSURE TREATED BASE POST 3- 3 1/2 6:1 MAX 6:1 MA ROW UNDERNEATH 5' T OR ADAPTATION BY PENNONI ASSOCIATES FOR THE BOARDS 2" ABOVE THE GROUND TO FEET IN LENGTH SLOPE DELDO SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS 2" SOLE RISK AND WITHOUT LIABILITY OR LEGAL TOP OF CONCRETE FOOTING 3" ALLOW DRAINAGE TO PASS WITHIN 2 FT EXPOSURE TO PENNONI ASSOCIATES; AND OWNER BELOW GRADE UNDERNEATH SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

KEEP TOP OF CONCRETE FOOTING 3" BELOW GRADE 5' 5' 5' 5' PROJECT PLAWX21003 CONCRETE FOOTING 3.0' 3.0' 2021-07-14 3' - 0" 3000 PSI MIN. SUBGRADE DATE CONCRETE FOOTING COMPACTED TO 95% OF ASTM D 1557 DRAWING SCALE N.T.S. ALL POSTS SET ON 6" MIN. 34" COMPACTED CRUSHED STONE BED ALL POSTS SET ON 6" MIN. 34" EQUAL SPACES BETWEEN COMPACTED CRUSHED STONE BED EXPANSION AND CONTROL DRAWN BY SRA JOINTS (5' MAX.) 12" 12" APPROVED BY GBR

......

DIA.DIA.
JOINT SPACINGSIDEWALK SECTION
TRASH ENCLOSURE FENCESIGNAGE MOUNTING DETAILSIDEWALK DETAIL
11N.T.S.
12N.T.S.
13N.T.S.SHEET11OF 14
142

Paj 143

Item 5.

PENNONI ASSOCIATES INC.

Christiana Executive Campus

121 Continental Drive, Suite 207

Newark, DE 19713-4310

T 302.655.4451 F 302.654.2895

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR TERMINAL 1-WAY

AND OWNER MUST BE NOTIFIED OF ANY

DISCREPANCIES BEFORE PROCEEDING WITH WORK

2-WAY 3-WAY

FLOW CHANNEL PATTERNS

BAY POINTE APARTMENTS SANITARY SEWER DETAILS PATEL HOSPITALITY PROPERTIES NOT TO SCALE

BAY ROAD3171 DUPONT PARKWAY
KENT COUNTYAPPROVALKENT COUNTYAPPROVALKENT COUNTYAPPROVALKENT COUNTYAPPROVAL
DEPARTMENT OF PUBLIC WORKSDEPARTMENT OF PUBLIC WORKSDEPARTMENT OF PUBLIC WORKSDEPARTMENT OF PUBLIC WORKS
STANDARD DETAILSSTANDARD DETAILSSTANDARD DETAILSSTANDARD DETAILS
RELINER INSIDESPECIAL FITTINGSFLOW CHANNELSINGLE SEWER CLEANOUT
DIRECTOR OF PUBLIC WORKSDIRECTOR OF PUBLIC WORKSDIRECTOR OF PUBLIC WORKSDIRECTOR OF PUBLIC WORKS
DROP MANHOLEPATTERNSAND MAIN LINE CONNECTION
DETAIL
SS-21SS-04SS-06CO-07

CITY OF DOVER, DLEAWARE 19901 DELAWARE DATE DATE DATE DATE

TOWNSEND, DELAWARE 19734 DELAWARE DELAWARE DELAWARE

PAVED ROAD GRAVEL ROAD

12"
EXISTING PAVED ROAD 6" TYPICAL EXISTING GRAVEL ROAD
TYP.

6"
TYP.

SAWCUT EXISTING PAVEMENT (TYP.) BASE COURSE GRADED AGGREGATE

BITUMINOUS CONCRETE GEO-TEXTILE FABRIC

UNDISTURBED SOIL BASE COURSE GRADED AGGREGATE

2' COMPACTED BACKFILL MATERIAL WITH A 24" INITIAL BACKFILL MIN. OF 95% MAXIMUM DRY DENSITY COVER BEFORE EMBEDMENT MAGNETIC DETECTOR TAPE 12 FT. MAX. DIA. TO READ "CAUTION SEWER COVER-SEE LINE BELOW" 22 FT. MAX. BEDDING AS REQUIRED NOTE NO. 6 COVER (SEE SPECIAL BEDDING DETAIL) FOR DEEPER SPRINGLINE ELEVATION INSTALLATIONS

36" MIN.
TRENCH WIDTH
BACKFILL
MATERIAL SHALL
BE COMPACTED ALS BRD BRD GBR BY

PROJECT STATUS:
----
TO 95% MAXIMUM
DRY DENSITY
24" INITIAL
BACKFILL MINIMUM NOTES:
COVER UNDISTURBED UNDISTURBED PIPE DIAMETER TRENCH WIDTH

PER DAC COMMENTS/CHECK PRINT SUBMISSION BEFORE 1) 72" MINIMUM FINISHED PAVING WIDTH IN DELDOT R.O.W. EARTH EARTH COMPACTION 6" 36" 2) FOR TRENCHES REQUIRING SHORING AND BRACING, ALL WIDTHS SHALL BE 8" 36" INCREASED BY 2 FT. COMPACTED GRANULAR MATERIAL WITH A COMPACTED GRANULAR MATERIAL MINIMUM COMPACTION OF 95% MAXIMUM 10" 36" 3) WHEN THE GEOTECHNICAL REPORT INDICATES A HIGH WATER TABLE OR

PLOTSTYLE:Pennoni NCS.stb WITH A MINIMUM COMPACTION DRY DENSITY CONDITIONS WARRANT, WELL POINTS SHALL BE INSTALLED TO MAINTAIN OF 95% MAXIMUM DRY DENSITY 12" 36" REQUIRED WIDTHS AND SUITABLE BEDDING. TRENCH WIDTH (SEE TRENCH TRENCH WIDTH (SEE TRENCH 15" 36" 4) THE ENTIRE THICKNESS AND VERTICAL EDGE OF CUT SHALL BE TACKED. PAVEMENT WIDTH DETAIL) PAVEMENT WIDTH DETAIL) 18" 42" 5) THE SAME DEPTH OF PAVEMENT MATERIAL WHICH EXISTS BE REINSTALLED, BUT

REVISIONS 21" 42" IN NO CASE SHALL THE ASPHALT PAVEMENT BE LESS THAN 2" THICK.

24" 48" 6) THE ASPHALT PAVEMENT MATERIAL SHALL BE INSTALLED AND COMPACTED

REVISED PER COD PW THOROUGHLY TO ACHIEVE A SMOOTH LEVEL PATCH.

REVISED PER KC PW
27" 60"
7) ALL MAXIMUM DRY DENSITY REQUIREMENTS ARE BASED ON STANDARD PROCTER
30" 60" IN UNPAVED AREAS AND MODIFIED PROCTOR IN PAVED AREAS.
33" 66"
8) ONLY APPLY COMPACTED EFFORT OVER PIPE AFTER 24" INITIAL COVER

FINAL PLANS

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS6002.dwg PLOTTED:5/24/2023 4:50 , PMBY:Andrew Shields 36" 66" REQUIREMENT IS MET. 42" 78" 9) LIFTS TO BE A MINIMUM OF 8" MAXIMUM OF 12", EXCEPT FOR FIRST LIFT OF COVER 48" 84" OVER PIPE.

54" 96" 10) PVC SDR 35 FOR GRAVITY SANITARY SEWER APPLICATIONS FROM 3 TO 15 FT DEEP.

60" 102" 11) PVC SDR 26 OR PVC SDR 21 FOR GRAVITY SANITARY SEWER APPLICATIONS FROM 3 TO 20 FEET DEEP (CORRUGATED PVC PIPE AS ACCEPTABLE ALTERNATIVE).

4321NO.
66"108"
72" 120" 12) PVC SDR 21 FOR SANITARY SEWER FORCE MAIN APPLICATIONS 12 IN. DIA. OR LESS.

03/14/23 02/17/22 02/11/22 132" 9/24/21 78" DATE 13) FINAL TRENCH RESTORATION SHALL BE IN ACCORDANCE WITH CURRENT DELDOT 84" 138" STANDARDS

90" 144" 14) NO MATERIAL WILL BE ACCEPTED FOR BACKFILL THAT HAS A PLASTICITY INDEX 102" 156" GREATER THAN 30 ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE 108" 168" 15) ALL TRENCHING OPERATIONS MUST FOLLOW OSHA GUIDELINES FOR EXCAVATION PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI TRENCH PAVEMENT WIDTH ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM. NOT TO SCALE

KENT COUNTY APPROVAL DEPARTMENT OF PUBLIC WORKS KENT COUNTY APPROVAL DEPARTMENT OF PUBLIC WORKS ISSUED: KENT COUNTY APPROVAL DEPARTMENT OF PUBLIC WORKS PROJECT PLAWX21003 STANDARD DETAILS STANDARD DETAILS REVISED: STANDARD DETAILS 01/23/13 DATE 2021-07-14 DIRECTOR OF PUBLIC WORKS SPECIAL BEDDING AND EMBEDMENT DIRECTOR OF PUBLIC WORKS MODIFIED REVISED: DIRECTOR OF PUBLIC WORKS SEWER CLEANOUT DETAIL FOR PVC SANITARY SEWER PIPE TRENCH PAVEMENT WIDTH (TRAFFIC AREAS) PLATE DRAWING SCALE N.T.S. DATE SS-02 DATE SS-01 DATE CO-04 DELAWARE DELAWARE DELAWARE DRAWN BY SRA

APPROVED BY GBR

CS6002
SHEET 12 OF 14
143

Paj 144

Item 5.

PENNONI ASSOCIATES INC.

Christiana Executive Campus

121 Continental Drive, Suite 207

Newark, DE 19713-4310

T 302.655.4451 F 302.654.2895

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR

AND OWNER MUST BE NOTIFIED OF ANY

DISCREPANCIES BEFORE PROCEEDING WITH WORK

BAY POINTE APARTMENTS PATEL HOSPITALITY PROPERTIES BAY ROAD

WATER DETAILS 3171 DUPONT PARKWAY

CITY OF DOVER, DLEAWARE 19901 TOWNSEND, DELAWARE 19734 ”

CONCRETE EXISTING DIP MAIN THRUST BLOCK

EBAA MECHANICAL JOINT

AWWA C900 WATER MAIN

MJ X FLG TAPPING VALVE MJ FITTING

CAST IRON MJ TAPPING SLEEVE ALS BRD BRD GBR BY

PROJECT STATUS: ---- NOTES: 1. CITY OF DOVER MUST APPROVE ALL CONNECTIONS TO THE SYSTEM. WET TAPS SHALL BE COORDINATED WITH THE CITY AND A REPRESENTATIVE SHALL BE ON SITE DURING TAP. 2. WET TAPPING DETAIL IS FOR USE ON DUCTILE IRON PIPE. ADJUSTMENTS MAY BE

PER DAC COMMENTS/CHECK PRINT SUBMISSION REQUIRED FOR PVC WATER MAINS. 3. PROVIDE THRUST BLOCKS OR RESTRAINTS PER CITY DETAILS. 4. ALL VALVES SHALL OPEN IN THE COUNTERCLOCKWISE DIRECTION. 5. ALL TAPPING EQUIPMENT MUST BE DISINFECTED (CHLORINE MAY BE SWABBED ON INTERIOR OF ALL FITTINGS).

PLOTSTYLE:Pennoni NCS.stb
PIPE TAPPING DETAIL

REVISIONS

REVISED PER COD PW 6" MIN.

REVISED PER KC PW STAINLESS STEEL BANDS

FINAL PLANS

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS6003.dwg PLOTTED:5/24/2023 4:50 , PMBY:Andrew Shields 4 3 2 1 NO. GPT MODEL "C" END SEAL (OR APPROVED EQUAL)

03/14/23 02/17/22 02/11/22 9/24/21 DATE NOTE: PROVIDE END SEALS AT EACH END OF CASING PIPE TO CAP ANNULAR SPACE 6" MIN. BETWEEN THE CARRIER PIPE AND CASING PIPE. ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED CASING PIPE END SEAL DETAIL TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON A DOUBLE DETECTOR CHECK VALVE SHALL BE THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION INSTALLED DOWNSTREAM OF THE WATER METER IN OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS THE PROPOSED BUILDING IN A MECHANICAL ROOM SOLE RISK AND WITHOUT LIABILITY OR LEGAL THAT MAY BE ACCESSED FOR REGULAR INSPECTION EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI OF THE EQUIPMENT. CHECK VALVE SHALL MEET THE ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND REQUIREMENTS OF THE CITY OF DOVER WATER EXPENSES ARISING OUT OF OR RESULTING THEREFROM.

DEPARTMENT.
PROJECT PLAWX21003
DEPTH OF WATER METER REGISTER HEAD SHALL BE
6" TO 12" BENEATH FINISH GRADE. DATE 2021-07-14
DRAWING SCALE AS NOTED
WATER METER VAULT DETAIL
DRAWN BY BRD

APPROVED BY GBR

CS6003
SHEET 13 OF 14
144

Paj 145

Item 5.

PENNONI ASSOCIATES INC.

Christiana Executive Campus

121 Continental Drive, Suite 207

Newark, DE 19713-4310

T 302.655.4451 F 302.654.2895

ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR

AND OWNER MUST BE NOTIFIED OF ANY

DISCREPANCIES BEFORE PROCEEDING WITH WORK

BAY POINTE APARTMENTS STORM SEWER DETAILS PATEL HOSPITALITY PROPERTIES BAY ROAD 3171 DUPONT PARKWAY

CITY OF DOVER, DLEAWARE 19901 TOWNSEND, DELAWARE 19734

ALS BRD BRD GBR BY

PROJECT STATUS: ----

PER DAC COMMENTS/CHECK PRINT SUBMISSION WING WALL DETAIL 1

PLOTSTYLE:Pennoni NCS.stb
N.T.S.

REVISIONS DOWNSPOUT (SEE ARCH. PLANS)

REVISED PER COD PW REVISED PER KC PW PVC DOWNSPOUT TO WYE ADAPTOR

EXTERIOR BLDG WALL

FINAL PLANS

U:\Accounts\PLAWX\plawx21003 - bay pointe apartments 2\DESIGN\_SHEETS\CS6004.dwg PLOTTED:5/24/2023 4:50 , PMBY:Andrew Shields PVC WYE

CLEANOUT VENT FINISHED GRADE 4 3 2 1 NO.

03/14/23 02/17/22 02/11/22 9/24/21 DATE

BACKFILL TRENCH WITH SUITABLE ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE EXCAVATED MATERIAL PROJECT. THEY ARE NOT INTENDED OR REPRESENTED DEPTH AS TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON REQUIRED THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER 6" SDR 35 PVC PIPE PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND 6" SDR 35 PVC PIPE - CONNECT TO EXPENSES ARISING OUT OF OR RESULTING THEREFROM. STORMSEWER @ 1% MIN. SLOPE PROJECT PLAWX21003 6" PVC 90° ELBOW DATE 2021-07-14 DRAWING SCALE AS NOTED

DRAWN BY BRD

APPROVED BY GBR

2
DOWNSPOUT CONNECTION DETAIL

N.T.S.CS6004
SHEET14OF 14
145

Paj 146

Item 5.

146

Tounen nan reyinyon sa a