Ir al contenido principal
AskDover

Regular City Council Packet

City Council Meetings. 26 de octubre de 2026.

Abrir el PDF (29.8 MB)

Este texto se extrajo de el PDF de forma automática y puede contener errores. El PDF es el registro oficial, así que consúltelo antes de confiar en esto.

43 páginas tienen poco o ningún texto legible aquí, a menudo por ser escaneos o dibujos. Para verlas, consulte el PDF.

Página 1

CITY OF DOVER, DELAWARE

REGULAR CITY COUNCIL MEETING

Monday, October 26, 2026 at 6:30 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware

AGENDA THIS AGENDA HAS BEEN REVISED BY REMOVING ITEM #17 – DOVER HUMAN RELATIONS COMMISSION APPOINTMENT OF CHIARA FOX-MOLOCK

VIRTUAL MEETING NOTICE

This meeting will be held in the City Hall Council Chambers with electronic access via WebEx. Public participation information is as follows:

Dial: 1-650-479-3208
Link: https://tinyurl.com/538f5jpb
Event number: 2530 726 3477
Event password: DOVER (if needed)

If you are new to WebEx, get the app now at www.webex.com/ to be ready when the meeting starts.

The meeting can also be viewed on Comcast Channel 14, Verizon Channel 20, and on the City's Streaming Player located at www.cityofdover.gov under "Quick Links".

OPEN FORUM - 15 Minutes Prior to Official Meeting (6:15 p.m.)

The “Open Forum” segment is provided to extend the opportunity to the general public to share their questions, thoughts, comments, concerns, and complaints. Discussion of any item appearing on the agenda as a public hearing is prohibited during the Open Forum as an opportunity will be provided during consideration of that item. Citizen comments are limited to three (3) minutes. Council is prohibited from taking action since they are not in official session; however, they may schedule such items as regular agenda items and act upon them in the future.

INVOCATION - Elder Ellis B. Louden

PLEDGE OF ALLEGIANCE - Council President Neil

ADOPTION OF AGENDA

ADOPTION OF CONSENT AGENDA

Página 2

REGULAR CITY COUNCIL MEETING - October 26, 2026 PAGE 2

All Consent Agenda items are considered routine and non-controversial and will be acted upon by a single roll call vote of the Council. There will be no separate discussion of these items unless a member of Council so requests, in which event the matter shall be removed from the Consent Agenda and considered a separate item.

CONSENT AGENDA

ADOPTION OF MINUTES

  • 1.Regular City Council Meeting of October 12, 2026

COMMITTEE REPORTS

  • 2.Council Committee of the Whole Report of October 13, 2026

COUNCIL REPORTS - SEPTEMBER 2026

  • 3.First District
  • 4.Second District
  • 5.Third District
  • 6.Fourth District
  • 7.At-Large
  • 8.Council President Neil

Legislative, Finance, and Administration Committee

  • 9.Proposed Ordinance #2026-15 - Amending Chapter 42 - Environment – By Adding Sec.42-3 - Lighting (Eddie Kopp, Code Enforcement Supervisor)

(Committee Recommendation: Forward Proposed Ordinance#2026-15 to council for approval.)

(This item will be considered during the latter part of the meeting - see item #18)

  • 10.Budget Amendment Discussion (Sharon Duca, City Manager)

(Committee Action Not Required)

  • 11.Alderman's Court Ad Hoc Committee Update (Councilman Anderson)

(Committee Action Not Required)

Parks, Recreation, and Community Enhancement

  • 12.Consideration of Withdrawal and Reallocation of CDBG Funds for People's Community Center Renovation Project (Debbie O'Brien, Community Development Manager)

Página 3

REGULAR CITY COUNCIL MEETING - October 26, 2026 PAGE 3

(Committee Recommendation: The motion for approval of the withdrawal of the previously approved $40,000 CDBG allocation for the People's Community Center Renovation Project and direct staff to make the funds available through the 2027 Annual Action Plan Process failed to pass.)

QUARTERLY REPORTS

  • 13.Quarterly Revenue Report as of September 30, 2026

(Staff Recommendation: Acceptance of the Quarterly Revenue Report)

  • 14.Quarterly Review - Capital Investment Plan (CIP) (July, August, September)

(Staff Recommendation: Acceptance of the Capital Investment Plan (CIP) Report

SEMI-ANNUAL REPORTS

  • 15.Semi-Annual Inspection by City Manager - Robbins Hose Company

(Staff Recommendation: Acceptance of the Semi-Annual Inspection Report)

ITEMS NOT ON THE CONSENT AGENDA

  • 16.Kent County Hazard Mitigation Plan (Kay Sass, Emergency Management Director)
  • 17.Reallocation of Budgeted Personnel Resources (Sharon Duca, City Manager)

ORDINANCES

FIRST READING - The First Reading is offered on the Proposed Ordinance. Final action by Council will take place during the Second Reading on NOVEMBER 09, 2026. The ordinance is available at the entrance of the Council Chambers, on the City's website at www.cityofdover.gov under "Government," or by contacting the City Clerk's Office at 302-736-7008 or cityclerk@doverde.gov.

  • 18.Proposed Ordinance #2026-15 - Amending Chapter 42 - Environment - By Adding Sec. 42-3 - Lighting

CITY MANAGER’S ANNOUNCEMENTS

MAYOR'S ANNOUNCEMENTS

COUNCIL MEMBERS’ ANNOUNCEMENTS

ADJOURNMENT

THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING

Página 4

Item #1.

REGULAR CITY COUNCIL MEETING

The Regular City Council Meeting was held on October 12, 2026, at 7:22 p.m. with Council President Neil presiding. Council members present were Ms. Hall, Mr. Boggerty, Mr. Anderson, Dr. Pillsbury, Ms. Arndt, Mr. Rocha, and Mr. Lewis. Dr. Sudler was absent.

Staff members present were Police Chief Johnson, Ms. Marney, Ms. Duca, Ms. Melson-Williams, Deputy Fire Chief Iannucci, City Solicitor Griffith, and Ms. Bennett. Mayor Christiansen was also present.

OPEN FORUM

The Open Forum was held at 6:15 p.m., prior to commencement of the Official Council Meeting. Council President Neil declared the Open Forum in session and reminded those present that Council was not in official session and could not take formal action.

Michael Sheinbaum read a poem concerning homelessness and asked Council and the Mayor to provide a plan for men who would otherwise have overnight shelter during the winter. He encouraged City leaders to show compassion for neighbors in need.

William Faust, Dover, requested an update regarding the Hugg lawsuit and questioned its potential cost to taxpayers and accountability for any related conduct. He also questioned the startup costs and anticipated benefits of the Alderman’s Court, requested public statements regarding recent gun violence, and expressed concern about City finances, increasing costs to residents, vacant storefronts, and public safety.

Doug Hall, Dover, reported a suspected fraudulent email purporting to come from the Mayor and offering a grant to Bobby Wilson of Booted and Suited in exchange for a payment. He offered copies for review. Mr. Hall also supported continued winter shelter at People’s Church and expressed concern about people being left outside in freezing temperatures. He alleged misconduct involving City employees and property condemnation and stated that he intended to provide information to the United States Attorney.

Lee Robinson, Dover, supported People’s Church and described the difficulties faced by unsheltered residents during recent rain. The speaker expressed concern about increasing numbers of unsheltered young people and women and urged Council to preserve the shelter’s services.

Melanie Coker, a fourth-grade student, described volunteering to serve meals and prepare supplies for people experiencing homelessness. She spoke about the sense of community at the shelter and the assistance provided to a family member. She asked Council to allow the shelter to continue providing a safe place to sleep.

Gina Cloud requested that People’s Church be allowed to continue its winter overnight lodging program until an alternative was available. She described volunteering to prepare and serve meals and invited Council members to visit on October 21 to observe the program. She urged the City to retain the temporary shelter while working toward a permanent solution.

Paulette Gibbs-Snipes, representing ICG Enterprises, Inc., supported People’s Community Center and its Code Purple Winter Sanctuary. She acknowledged the importance of zoning and public

Página 5

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 2

safety requirements and urged Council to work with the Center to find a practical solution allowing the sanctuary to operate safely.

Evelyn Finney Stevenson supported Code Purple and described her brother’s experience in the program. She stated that responsibilities, structure, trust, and a sense of purpose helped him build confidence and transition back into the community. She emphasized that the program provides support beyond meals and shelter.

Reverend Dr. Mark Parsons, pastor of the Presbyterian Church of Dover, supported People’s Community Center on behalf of members and volunteers. He acknowledged neighborhood safety concerns but stated that eliminating winter shelter without an immediate alternative could increase hardship and public safety problems. He urged City leaders, service providers, and residents to develop solutions together.

Robert Proud, 26 South State Street, described his previous use of Code Purple and emphasized the importance of its winter shelter. He acknowledged residents’ concerns but questioned whether the shelter’s overnight guests were the source of the neighborhood’s problems. He expressed concern about the risk of deaths from exposure if the service was unavailable.

Yolanda Jackson, Magnolia, described volunteering to cook and serve meals at People’s Community Center. She asked what alternative shelter would be available and requested information regarding the number of available beds, a replacement plan, and a date for reopening or replacing the Code Purple location.

Stewart Marks, American Street, Dover, described volunteering to serve meals and stated that People’s Community Center provides hope and assistance beyond food and lodging. He expressed concern that removing shelter could increase desperation and crime and urged Council to consider the long-term consequences.

Garth Stebolo, Smyrna, described volunteering to cook at People’s Church and expressed concern about hypothermia among unsheltered residents. He stated that volunteers and supplies were available and urged Council to allow the winter shelter to continue operating.

Sue Harris, 241 Pine Street, coordinator of People’s Community Center, described a longtime sanctuary participant who relies on its consistency and support. She expressed concern about residents with mental health needs who may have difficulty finding alternatives. She distributed information concerning the history of Code Purple and its inclusion in the City’s Consolidated Plan and requested support for the winter sanctuary. (Exhibit #1)

Andrea Freud, Bradford Street, stated that her concerns related to funding previously awarded to People’s Church and the representation of neighbors’ concerns. She alleged that comments by residents had been misrepresented and questioned the Center’s transparency and stewardship of public and charitable funds. She referred to Ms. O’Brien’s report and offered to submit her complete written remarks. (Exhibit #2)

Lachelle Paul, Dover, questioned what had changed in the shelter’s operations or zoning after years of City and State support. She urged consistent enforcement and asked that winter shelter remain available until an alternative was provided.

Página 6

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 3

Ms. Paul also addressed the proposed resolution concerning the Police Chief and Mayor. She requested accountability for alleged violations involving transportation and City vehicle use, questioned the associated costs to taxpayers, and urged repayment of any amounts improperly spent rather than changes intended to excuse past conduct.

Dr. Armina Domingue, executive director of Dover Interfaith Mission for Housing, offered to participate in a collaborative winter response plan involving the City, shelters, churches, and community partners. She stated that the organization had limited space and resources but was willing to explore its capacity and help identify practical shelter options.

Dale Swain, representing D-CLEAR and the Citizens Alliance for Responsible Land Use, supported the proposed data center moratorium. He encouraged study of resource consumption, utility infrastructure, and environmental impacts before approving development and suggested reviewing New Castle County’s ordinance. He stated that D-CLEAR members were willing to assist with the study.

Rick Reynolds described his experience being homeless and using People’s Church during the previous winter. He questioned the reasons for discontinuing support after years of service and expressed concern that redevelopment priorities could displace vulnerable residents. He urged City leaders to consider the human consequences of losing the shelter.

Janice Smallwood, Dover, described visiting People’s Church to encourage others, share information, and help clean up. She stated that the program provides a welcoming community and asked that its services continue.

At the conclusion of public comments, it was announced that winter shelter and applicable laws and codes would be discussed at the October 27 Legislative, Finance, and Administration Committee meeting. Members of the public were invited to participate, and the speaker emphasized the need for a solution by December 1. Council President Neil noted that the City also maintains emergency plans for cold weather.

INVOCATION

The invocation was given by Elder Ellis B. Louden.

PLEDGE OF ALLEGIANCE

The Pledge of Allegiance was led by Councilman Lewis

ADOPTION OF AGENDA

Ms. Arndt moved for adoption of the agenda, seconded by Dr. Pillsbury and unanimously carried.

ADOPTION OF CONSENT AGENDA

All Consent Agenda items are considered routine and non-controversial and will be acted upon by a single roll call vote of the Council. There will be no separate discussion of these items unless a member of Council so requests, in which event the matter shall be removed from the Consent Agenda and considered a separate item.

Ms. Arndt moved for adoption of the consent agenda, seconded by Dr. Pillsbury and carried by a unanimous roll call vote (Sudler absent).

Página 7

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 4

PROCLAMATION – INDIGENOUS PEOPLE’S DAY

The City Clerk read the following Proclamation into the record:

WHEREAS, the City of Dover acknowledges that the land on which we live and work is part of the ancestral homeland of the Lenni-Lenape people, who have stewarded these lands for thousands of years; and

WHEREAS, the Lenni-Lenape, also known as the Delaware people, are the Indigenous inhabitants of Delaware and the surrounding region, and their enduring presence, traditions, and cultural contributions remain vital to our shared history; and

WHEREAS, Indigenous Peoples continue to enrich our community through leadership, service, scholarship, art, and advocacy, carrying forward the resilience and spirit of their ancestors; and

WHEREAS, Indigenous Peoples' Day is an opportunity to honor the Lenni-Lenape and all Indigenous Nations, past, present, and future, while recognizing their sovereignty, wisdom, and deep connection to the land; and

WHEREAS, the City of Dover is committed to fostering understanding, respect, and reconciliation by acknowledging the original inhabitants of this land and celebrating the diversity of Indigenous cultures; and

NOW, THEREFORE, I, ROBIN R. CHRISTIANSEN, MAYOR OF THE CITY OF DOVER, DELAWARE, do hereby proclaim October 12, 2026, as INDIGENOUS PEOPLES' DAY in the City of Dover and encourage all residents to recognize and celebrate the Lenni-Lenape and all Indigenous Peoples for their invaluable contributions to our history and community.

On behalf of the Mayor and Council, Mayor Christiansen presented the proclamation to Chief Douglas and members of the tribe.

Chief Douglas thanked the City for the recognition and discussed Delaware legislation creating an Indigenous Peoples Commission. Another representative emphasized the tribe’s place as the first people of the First State.

PROCLAMATION – HALLOWEEN TRICK-OR-TREAT

The City Clerk read the following Proclamation into the record:

WHEREAS, the children of the City of Dover enjoy the fun and festivities associated with the observance of the Halloween Trick-or-Treat custom, emerging from their homes as ghosts, witches, princesses, cartoon characters, caped crusaders, or action heroes and traveling with friends and family door to door throughout the neighborhood to gather treats; and

WHEREAS, Children ages 12 and under may participate in Trick-or-Treating in small groups, ages will be strictly enforced. Parents must accompany their children throughout their journeys in celebrating Halloween Trick-or-Treat. Motorists are urged to drive with extra caution and to be ever watchful of our youngsters making their rounds; and

Página 8

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 5

WHEREAS, it is requested that residents indicate their willingness to welcome children by keeping their porch or exterior lights on and that youngsters call only on homes that are lit.

NOW, THEREFORE, I, ROBIN R. CHRISTIANSEN, MAYOR OF THE CITY OF DOVER, DELAWARE, do hereby proclaim that the Halloween Trick-or-Treat observance to be held on Saturday, the 31st day of October 2026, between the hours of 6:00 p.m. and 8:00 p.m. in the City of Dover, and urge all residents, both young and old, to make this a happy and safe occasion for our children.

Mayor Christiansen accepted the proclamation and encouraged residents to make the Halloween observance safe and enjoyable.

ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF SEPTEMBER 28, 2026 The Minutes of the Regular Council Meeting of September 28, 2026, were unanimously approved by motion of Ms. Arndt, seconded by Dr. Pillsbury, and bore the written approval of Mayor Christiansen.

COUNCIL COMMITTEE OF THE WHOLE REPORT - SEPTEMBER 29, 2026

The Council Committee of the Whole met on September 29, 2026, at 6:00 p.m. with Councilman Anderson presiding in the absence of Council President Neil. Members of Council present were Ms. Arndt, Mr. Boggerty, Mr. Lewis (via WebEx), Mr. Rocha, and Dr. Sudler (out at 11:44 p.m.). Ms. Hall and Dr. Pillsbury were absent. Mayor Christiansen was also present. Civilian members present for their Committee meetings were Ms. Jackson (Safety, Advisory, and Transportation), Mr. Garfinkel (via WebEx), and Mr. Shevock (via WebEx) (Legislative, Finance, and Administration). Ms. Kemp (Safety, Advisory, and Transportation) and Mr. Lewis (Parks, Recreation, and Community Enhancement) were absent.

ADOPTION OF AGENDA

Ms. Arndt moved for adoption of the agenda, seconded by Mr. Rocha and unanimously carried.

Booted and Suited (Bobby Wilson, CEO and Founder) Mr. Anderson read a statement submitted by Council President Neil, who was absent due to illness. Council President Neil supported Mr. Wilson’s program, subject to available funding, particularly its proposed training and downtown cleanup component. He said uniformed workers could ease the strain on Public Works employees, improve downtown's appearance and safety, and provide a yearlong training opportunity that could lead to employment. He noted that Mr. Wilson had already demonstrated his commitment through a downtown cleanup.

Mr. Bobby Wilson, CEO and Founder of Booted and Suited, provided an overview of the organization’s proposed workforce development program in Dover. He stated that the organization had secured a downtown office for classroom instruction and a garage for automotive and construction training. The eight-week program would include three weeks of soft-skills training, followed by hands-on

Página 9

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 6

instruction provided by certified automotive mechanics and retired union tradespeople. He referenced proposed partnerships with the bricklayers’ union and Local 199, as well as an existing relationship with TechForce.

Mr. Wilson explained that he had personally funded the office and garage expenses and identified a need for workforce training opportunities in Dover after observing Kent and Sussex County residents traveling to Wilmington for similar services. His goal was to connect Dover-area residents with employment opportunities closer to home.

He also discussed the organization’s eight-week farmers market held on The Green and plans to expand the initiative as part of a broader effort to create a cleaner, greener, and safer Dover.

Mr. Wilson proposed establishing a uniformed downtown cleanup crew operating five to six days per week, with the potential for an evening shift as the program expanded. Modeled after Downtown Visions in Wilmington, the crew would clean streets and doorways, provide escorts for individuals who felt unsafe, and report concerns to the Police Department without performing or interfering with law enforcement duties. He also anticipated opportunities for individuals completing community service through probation and parole.

Mr. Wilson stated that the organization planned to sustain its efforts through grants and donations, with an accounting firm overseeing funds associated with the beautification initiative and communicating expenditures to the city. He noted that volunteers had already conducted power washing and street cleaning downtown with support from private citizens but that additional funding would be necessary to continue and expand those efforts.

Responding to Mayor Christiansen, Mr. Wilson stated that the program would serve returning citizens, SNAP recipients, and individuals with disabilities. He emphasized the importance of wraparound services, including assistance accessing food benefits, Medicaid, and healthcare. Individuals needing detoxification or rehabilitation would need those services before entering a jobsite, where safety was essential. The organization would work with individuals according to their needs and readiness for training. He stated that DDP had supported the farmers' market but had not yet provided financial assistance.

Mayor Christiansen suggested partnering with the Interfaith Ministers Association and Senator Paradee’s upcoming expungement program scheduled for October 21 at the Dover Hope Zone, 3 North Bradford Street.

Responding to Mr. Rocha, Mr. Wilson stated that Loockerman Street would be the primary focus, with work extending to nearby streets, including Governors Avenue, Queen Street, and New Street. Workers would also engage individuals and encourage enrollment in training. He stated that donors were interested in paying tuition and described opportunities in construction, including prevailing-wage projects and school construction throughout Delaware.

Página 10

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 7

Responding to Mr. Lewis, Mr. Wilson stated that he was pursuing county support and anticipated applying for state grants, including SNAP-related funding. He described access to three grant writers and a donation plan.

Responding to Mr. Lewis, Mr. Wilson stated that the organization had a contingency plan using grants and donations to continue operations.

Responding to Mr. Boggerty, Ms. Debbie O’Brien, Community Development Manager, stated that the proposed activities could potentially meet a national objective under public services. She had emailed the organization a CDBG application but had not received a response.

Responding to Dr. Sudler, Mr. Wilson discussed a proposed YouthBuild program for ages 16 through 24, modeled on a Wilmington program, and stated that he was speaking with the Dover Housing Authority.

Responding to Ms. Arndt, Mr. Wilson explained that Booted and Suited would provide the training rather than merely referring participants elsewhere, using qualified instructors and union partnerships.

Responding to Dr. Sudler, Ms. Sharon Duca, City Manager, stated that the only application she knew of was the economic development application that was included in the packet, and that Council had closed that application process in June. Mr. Anderson initially noted that existing applications had been excluded from the closure.

Mr. Boggerty suggested completing the CDBG application as a potentially simpler funding route.

Mr. Anderson explained that a CDBG application would still require scoring, committee review, and Council consideration and that available funding had not yet been established.

Mr. Lewis noted that economic development money had been allocated to the Garrison Oak entrance project and that funding this request would require a budget amendment.

Ms. Trish Marney, Controller/Treasurer, concurred and stated that the application process would need to be reopened. She clarified that the committee voted to end the process on June 22, Council approved that action on July 13, and Mr. Wilson’s application was dated July 15.

Mr. Anderson suggested referring the proposal to staff for consideration during the October budget amendment.

Ms. Arndt confirmed that the packet contained the application and stated that it was incomplete. She identified requirements including proof of at least two years of

Página 11

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 8

operation, a location map and street address, zoning confirmation, letters of support, progress reports, and the required project description. She stated that she would support consideration after the application was completed and staff verified the information.

Mr. Boggerty encouraged Mr. Wilson to pursue both applications while awaiting further consideration.

Mayor Christiansen encouraged Mr. Wilson to follow the established process, identify an available revenue source, and provide the information needed for staff review.

Mr. Lewis agreed that the application needed to meet grant standards and that applicants should be treated fairly.

William G. Faust, Jr., Dover, questioned the program’s cost, responsibility for downtown sidewalk cleaning, and the effect of a budget amendment on residents with fixed incomes. He urged the city to prioritize its financial obligations and seek outside funding if city resources were insufficient.

Vonderlear Smack, Dover, requested a workshop to help organizations prepare grant applications.

LaChelle Paul, Dover, supported the concept but raised concerns about the deficit, increased user fees, equal access to funding, and tracking expenditures.

Doug Hall, Dover, supported grant-writing assistance and urged greater attention to small businesses and community needs, while criticizing city spending and enforcement practices.

Belinda Main, Dover, questioned how the city would generate revenue, support downtown businesses, and complete projects while addressing parking, safety, and neighborhood needs.

Michael Sheinbaum, Dover, owner of Chris and Holly Family Entertainment, described limited local business opportunities, his charitable activities, and the need for greater compassion toward residents experiencing homelessness.

This item was informational; committee action was not required.

Dr. Sudler moved to refer the program to staff for review while Mr. Wilson completed the application and submitted it through both recommended funding avenues. The motion was seconded by Mr. Boggerty and unanimously carried.

By consent agenda, Ms. Arndt moved for approval of the Committee’s recommendation, seconded by Dr. Pillsbury and carried by a unanimous roll call vote (Sudler absent).

Página 12

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 9

PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE

The Parks, Recreation, and Community Enhancement Committee met with Mr. Anderson presiding in the absence of Chairwoman Hall.

Adoption of Agenda
Dr. Sudler moved for adoption of the agenda, seconded by Ms. Arndt and
unanimously carried.

Consideration of Withdrawal and Reallocation of CDBG Funds for People’s Community Center Renovation Project (Debbie O’Brien, Community Development Manager) Mr. Rocha recused himself from the meeting at 7:17 p.m.

Ms. Debbie O’Brien, Community Development Manager, presented the reasons for recommending withdrawal of the previously approved CDBG allocation for the People’s Community Center Renovation Project. She explained that the city was responsible for administering federal funds in accordance with applicable requirements and that noncompliance could lead to corrective action, repayment, or jeopardized future funding. She stated that public comments received during the environmental review prompted a broader review of project feasibility, documentation, procurement, contractual obligations, readiness, and compliance.

Ms. O’Brien organized her review around five questions: whether the project could achieve its CDBG objective within a reasonable timeframe; whether procurement standards had been followed; whether contractual obligations had been met; whether the city could assure compliance with federal requirements; and whether there was a reliable path to completion and service delivery. She stated that the renovation had not been completed despite multiple identified funding sources, and that a clear completion timeline and sustainable operating plan had not been demonstrated.

Ms. O’Brien reported unresolved procurement and supporting-documentation deficiencies, including failure to provide the required quotations. She stated that contractual performance and reporting concerns did not warrant extending the agreement. She also identified concerns about past performance and the ability to document eligible beneficiaries, verify eligibility, and measure outcomes supporting the CDBG national objective. She stated that the project had not progressed to implementation during the performance period and that required reports and documentation remained outstanding. Reduced grant-in-aid funding and the denial of economic development funding added to her concerns about sustainability.

Staff recommended approving the withdrawal of the previously approved $40,000 CDBG allocation for the People’s Community Center Renovation Project and directing staff to make the funds available through the 2027 Annual Action Plan Process.

Página 13

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 10

Responding to Ms. Arndt, Ms. O’Brien confirmed the requirement of three quotes and stated that she had received one quotation, with only every other page provided alongside the invoice.

Responding to Ms. Arndt, Ms. O’Brien stated that the agreement required satisfactory administration, monthly progress reports, compliance with applicable laws and policies, and completion within the performance period. She reported that requests for monthly reports on February 5 and August 13, 2026, had not produced the required reports. The performance period ended June 30, and no permit applications had been received before expiration; she did not believe permits had been submitted subsequently. She stated that compliance with the city’s purchasing policy and federal requirements had not been demonstrated. She described a May 26 meeting and follow-up emails, including reminders on October 7, May 27, and June 10 about procurement requirements. She stated that repeated attempts to obtain documentation and move the project forward had often gone unanswered. Ms. Arndt expressed disappointment that conditions had not been met for a project the committee had hoped to pursue.

Responding to Mr. Boggerty, Ms. O’Brien said that, according to the ARPA application, members were expected to contribute $152,978 in matching funds; however, the documentation provided reflects only $1,642 in matching disbursements. The 2025 CDBG application identified the church endowment as the source of the matching funds. In a subsequent conversation, Dr. Hodge indicated that the endowment would have to be used to complete the project if sufficient grant funding was not received. He acknowledged that this would not be sustainable long term, as revenue from the endowment was also being used to fund the church’s operations.

At the Legislative, Finance and Administration Committee meeting on February 26, 2026, Dr. Hodge stated that funding had been received from a private foundation to completely renovate a space that would be designated for various groups, including Neighborhood Partners, the Department of Labor, and Polytech, to conduct workshops and provide case management services. No additional information or documentation was provided regarding funding from the private foundation.

In an April 6, 2026, email, Dr. Hodge stated that the Governor’s Office had funded a renovation project in the basement of People’s Church to convert one large space into private offices and a conference room for training and case management. She subsequently contacted the Governor’s Office, which indicated that it had no knowledge of such a funding commitment. The Governor’s Office did reference a separate grant; however, after reviewing that grant, she determined that it was unrelated to this project.

The 2026 CDBG application identified the requested $40,000 as only 5% of an $800,000 project, with the remaining funding to be provided through other sources. Even if the full CDBG funding contemplated under the 2025–2029 Consolidated Plan were awarded, $40,000 annually for five years, for a total of $200,000, a

Página 14

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 11

substantial portion of the project cost would still need to be funded from other sources.

Given the varying representations regarding matching funds, the church endowment, private foundation funding, and funding reportedly provided through the Governor’s Office, she felt that additional transparency and documentation regarding the other funding sources for the project were warranted.

Responding to Mr. Boggerty, Ms. O’Brien stated that $153,978 was allocated in the first ARPA round and of that $40,000 was for the renovations. She noted that none of the money had been spent on those renovations, as she had receipts. She explained that instead it had been used for other work, including showers, the kitchen, and the sprinkler system, rather than the proposed renovation.

Responding to Dr. Sudler, Ms. O’Brien stated that there was not one item that she could think of that they were compliant with. She stated that documentation had consistently required additional work and that the pattern of repeated requests without responses was unusual. She also stated that the 2026 application had been submitted more than two weeks late.

Responding to Dr. Sudler, Ms. O’Brien stated that the process had been unusual and that she had not encountered similar issues previously.

Responding to Dr. Sudler, Ms. O’Brien stated that she had consulted the City Solicitor and that her sustainability concerns relied in part on statements from Dr. Hodge.

Responding to Mayor Christiansen, Ms. O’Brien confirmed that reporting, accountability, and timing requirements were applied consistently to all recipients and noted that the September 24, 2025, agreement ran through June 30, 2026, although the application estimated that the work would take no more than three months. She noted that the project had not started before the agreement expired.

Mr. Lewis expressed disappointment regarding the reported noncompliance. He felt that for somebody who wanted the grant money so badly, not to follow the guidelines and rules was appalling.

Ms. Arndt pointed out that only five members remained available and six were needed for a quorum. Mr. Anderson stated that the applicant would be allowed to respond on the record before the committee adjourned without action.

Dr. Hodge stated that he believed Ms. O’Brien was very capable and a valuable asset to the city and that, as a taxpayer, he appreciated the city’s efforts to ensure that subrecipients properly accounted for public funds and maintained appropriate financial controls. He stated that he supported the city closely scrutinizing subrecipients to ensure that funds were being properly administered.

Página 15

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 12

However, Dr. Hodge stated that he felt blindsided by the concerns being raised. He emphasized that the organization had not received any federal pass-through funding from the city, including ARPA or Community Development Block Grant funds, that had not been spent appropriately. He noted that reimbursement would not have been issued unless the organization had submitted the required documentation and receipts. He further stated that city representatives were welcome to conduct a site visit and review the work completed.

Dr. Hodge provided a timeline of the project, explaining that after the proposal was approved and the contract was signed by the Mayor in September, work began immediately. He stated that Tracey and Ms. O’Brien conducted a site visit and identified peeling paint that could potentially contain lead. The organization subsequently hired Harvard Environmental to conduct lead testing, which confirmed the presence of lead and the need for remediation. The remediation was completed, followed by a reinspection confirming that the issue had been addressed. He stated that the associated reports and receipts were submitted to the city.

Dr. Hodge stated that the organization was later advised that a Tier I environmental review was required. The organization hired a company recommended by the city, completed the review, and had the report submitted to the city. He further stated that during a site visit, Ms. Harvey advised him that three bids were not required because the project amount was under $50,000. Nevertheless, the organization had several contractors consider the project. After being dissatisfied with one prospective contractor, Dr. Hodge contacted the Downtown Dover Partnership for a recommendation. The organization ultimately entered into a contract with a recommended contractor and paid for the first phase of work, which included demolition of the existing bowling alley. He stated that the canceled check was submitted to the city for reimbursement.

Dr. Hodge recalled that Ms. O’Brien subsequently advised him that she was uncertain whether the organization would receive the full reimbursement because there had been significant public opposition. He believed this referred to approximately 17 form letters received by Council in January and maintained that many of the complaints contained in those letters did not relate directly to the organization. Regarding approximately $40,000 in prior funding, Dr. Hodge stated that the funds had been used to hire Becker Morgan to prepare plans for the new community development center and that documentation was available to substantiate those expenditures. He asserted that every expenditure made by the organization was accounted for, completed in a timely manner, and could be verified through an audit. He maintained that the organization had not been noncompliant with any funding requirement.

Dr. Hodge acknowledged that there had been considerable back-and-forth with Ms. O’Brien regarding documentation submitted for both programmatic CDBG expenses and the third round of ARPA funding. He stated that whenever additional information or documentation was requested, the organization provided it. He maintained that the organization had complied with all requests and emphasized

Página 16

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 13

that reimbursement-based funding required the organization to demonstrate that expenditures were appropriate before receiving city funds. For that reason, he questioned assertions that funding received several years earlier had been improperly spent or was noncompliant, stating that he believed the city would have raised those concerns at the time.

Dr. Hodge requested that the city reimburse the organization for the remaining funds it had already expended pursuant to its agreements. He stated that if the city could identify a specific expenditure that did not comply with required procedures or applicable federal regulations, it was the city’s responsibility to withhold reimbursement for that expenditure; however, he did not believe general concerns or suggestions of noncompliance were sufficient.

Finally, Dr. Hodge disputed concerns regarding the sustainability of the program. He stated that Howard Stafford was prepared to begin the workforce development program once the physical space was completed. He also reported that the organization had received a commitment that afternoon for approximately $350,000 from another source, which he declined to identify, as well as approximately $100,000 in DuPont funding. He stated that sufficient funding was available to continue the program once the physical space was completed in accordance with the Becker Morgan designs and the contract.

Responding to Mr. Boggerty, Dr. Hodge stated that the contractor had stopped work pending payment and that the organization expected the city to reimburse approximately $30,000. He noted that they were unable to give Ms. O’Brien updates because no work had occurred since the demolition.

Responding to Mr. Boggerty, Dr. Hodge stated that they would proceed with the work when the promised $350,000 became available and noted that the city still owes them $30,000.

Mr. Boggerty emphasized the need to use available resources to advance rehabilitation and community services and stated that he had reached a decision.

Responding to Ms. Arndt and following clarification from Ms. O’Brien, Dr. Hodge acknowledged that none of that allocation had been reimbursed. A separate $22,700 had been reimbursed for program activities.

Responding to Ms. Arndt, Dr. Hodge stated that there had been frequent email exchanges but no construction progress to report after demolition stopped. He noted that he was out of town for part of June, and all of July and August. He explained that there was nothing to report on.

Ms. O’Brien clarified that monthly reports were contractually required and that her outstanding request concerned the reimbursed shelter operations project, including an annual report needed for closeout to HUD by September 9.

Página 17

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 14

Dr. Hodge stated that he did not recall the request but accepted that she had the email.

Mr. Anderson asked that the closeout information be provided the next day.

Responding to Dr. Sudler, Dr. Hodge stated that, at Ms. O’Brien’s request, he had sent an explanation describing the advice from Ms. Harvey, the quotations obtained, and the decision to use the contractor recommended by DDP. He believed he had received an acknowledgment indicating the matter was resolved.

Ms. O’Brien responded that procurement requirements had reiterated multiple times and that her June 11 request for an additional quotation had not received a response. She stated that only alternating pages of the executed contractor agreement were submitted. The pages received called for a $52,004.04 deposit, while the submitted check was $44,504.04, with no explanation of the $7,500 difference. She stated that she had never heard Ms. Harvey say three quotations were unnecessary. Her understanding was that purchases above $10,000 required three quotations and projects above $50,000 required sealed bids or an RFP. When Dr. Hodge referenced the grant’s $40,000 amount, Ms. O’Brien identified the overall project as $178,000.

Mr. Anderson explained that, following Mr. Rocha’s recusal, only five of the committee’s eleven members were available and the committee could not conduct further business or vote. He stated that the applicant had been permitted to respond, so both positions were recorded.

Due to there being a lack of quorum, the Committee was unable to take action.

Mr. Anderson moved for adjournment of the Parks, Recreation, and Community Enhancement Committee meeting, hearing no objection the meeting adjourned at 8:09 p.m.

Mr. Rocha reentered the meeting at 8:11 p.m.

SAFETY, ADVISORY, AND TRANSPORTATION COMMITTEE

The Safety, Advisory, and Transportation Committee met with Chairman Boggerty presiding.

Adoption of Agenda Ms. Arndt moved for adoption of the agenda, seconded by Mr. Anderson and unanimously carried.

Update on Safety Concerns on East Loockerman Street (Jason Lyon, Assistant City Manager) Mr. Jason Lyon, Assistant City Manager, reported on the temporary closure of the eastbound entrance to East Loockerman Street near Burger King. The closure began in July following the committee’s earlier direction. Notices had been hand-

Página 18

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 15

delivered to affected residents and posted on social media. The affected area included East Loockerman Street and nearby connections to Division Street and involved more than 100 residents.

Mr. Lyon reported that the Police Department’s speed study showed substantially lower traffic volume, a four-mile-per-hour reduction in the 85th-percentile speed, and a six-mile-per-hour reduction in the highest recorded speed. He described those reductions as significant on a street with a 25-mile-per-hour limit. Staff had not received complaints about access to residents’ properties, but some residents questioned emergency access.

Mr. Lyon stated that the alternate emergency route could add approximately one to two minutes to response time. Staff had considered bollards and an automatic gate but were concerned about cost and mechanical reliability. Staff proposed replacing the temporary barrier with a Do Not Enter sign allowing emergency and authorized vehicles. He stated that Police, Fire, and Public Works representatives agreed that this was an efficient and economical approach and that unauthorized entry could be enforced.

Staff recommended approving the installation of a Do Not Enter/Emergency and Authorized Vehicles Only sign.

Responding to Mr. Rocha, Mr. Lyon stated that he did not have information regarding the number of emergency responses that occurred during the trial but that he would research it.

Mr. Rocha expressed doubt that drivers would honor a sign and favored retaining a barrier while protecting emergency access.

Mr. Lewis stated that residents continued to report speeding concerns and that an earlier Do Not Enter sign had been disregarded. He believed the barrier had made a difference and questioned whether police could provide adequate enforcement if it was removed. He suggested that a camera might be needed if staff relied on signage.

Dr. Sudler proposed signs on both sides of the entrance, camera enforcement, and substantial fines. He suggested a $500 first-offense penalty and a higher penalty for subsequent violations as a stronger deterrent.

Mr. Lyon stated that other traffic-calming measures, such as chicanes, were unsuitable because the road was narrow. He reiterated the estimated emergency- route delay and noted that cameras would involve cost and administration. Staff would need to research the authority to increase fines.

Chief Thomas Johnson stated that he believed the city could adopt a local traffic ordinance and establish a penalty but was uncertain whether digital technology could lawfully be used to enforce a prohibited-entry violation. He distinguished that

Página 19

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 16

issue from specifically authorized red-light and speed enforcement and offered to verify whether officers could issue violations based on video.

Mayor Christiansen stated, based on his personal experience as a firefighter rather than on behalf of the Fire Chief, that Division Street had long served as a rapid eastbound response route from the downtown fire station. He believed it could offer an easier route into the neighborhood, particularly for larger apparatus, and supported continuing the successful restriction while considering emergency access. He emphasized that time remained critical in emergency responses.

Responding to Mr. Lewis, Chief Johnson stated that officers could include the location in routine enforcement, but the available frequency would probably be insufficient to produce a substantial behavioral change.

Responding to Mr. Lewis, Mr. Lyon offered an initial estimate of approximately $1,000 to $2,000, depending on the approach, and stated that he would return with a more specific assessment regarding a permanent curb or barrier.

Ms. Arndt supported exploring a prominent sign and substantial posted fine but cautioned against a permanent obstruction that could prevent traffic diversion during an emergency at U.S. Route 13 and Division Street.

Mr. Rocha clarified that he favored a gate or other barrier that could be opened when needed.

Dr. Sudler suggested a remotely operated arm similar to a railroad crossing gate.

Mr. Boggerty cautioned that other neighborhoods had similar concerns and that closing roads throughout the city could create emergency-access challenges.

Mayor Christiansen stated that fire apparatus and ambulances were equipped with Opticom devices and suggested exploring whether that system could operate a gate.

Dr. Sudler discussed potential infrastructure funding, including the proposed Capital Area Municipal Sustainability Act, state legislators’ community transportation funds, and county support. He encouraged strengthening coordination with Kent County to help address infrastructure needs and reduce the burden on City residents.

Mr. Anderson recommended retaining the existing arrangement while staff researched the alternatives, stating that the current solution was working and that further evaluation did not need to be rushed.

Sarah, Clara, and Irma Bell, East Loockerman Street, described feeling safer riding bicycles and walking their dogs since the closure and asked that the road remain closed.

Página 20

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 17

Mary Bell, East Loockerman Street, thanked Council and stated that speeding resumed when the barrier was temporarily moved. She supported retaining the barrier while exploring a gate, heavier fines, or enforcement technology.

Robert Bell, East Loockerman Street, reported reduced traffic and speeding, supported emergency-access technology, and raised privacy concerns regarding license plate readers.

Terry Sipple, Dover, supported conspicuous signs, camera enforcement, and strong penalties.

David Suiters, East Loockerman Street, emphasized children’s safety, described longstanding speeding concerns, and favored an operable gate rather than an immovable barrier.

Jeremy Schneider, East Loockerman Street, described a serious crash near his home, reduced speeding, and increased neighborhood activity since the closure. He asked that the current barrier remain while options were considered.

Anthony Wilson, East Loockerman Street, stated that the closure had improved safety for his children and allowed him to run in the neighborhood, and described a recent police response in which vehicles arrived by different routes within a short interval.

Bonnie Pennington, Dover, described speeding and school-bus safety concerns on Kirkwood Street and requested equivalent attention to other neighborhoods.

William G. Faust Jr., Dover, suggested lower-cost alternatives, such as weighted barrels or posts with a brightly marked chain that emergency personnel could unlock.

Regan Coder, 406 Kings Highway, supported the barrier and suggested neighborhood-watch assistance and cameras.

Dawn Mejia, Dover, acknowledged previously using the street as a shortcut, stated that the barrier had changed her driving behavior, and reported increased two-way traffic in the alley behind Edgehill.

Jeanie Anderson, Dover, supported similar neighborhood benefits elsewhere in the city.

Belinda Main, Dover, supported retaining the barrier and requested broader traffic- safety measures, consistent enforcement, and attention to other affected streets.

Mr. Anderson moved to recommend continuing the current safety arrangement, have staff review the options discussed, and bring them back to the committee. The motion was seconded by Mr. Rocha and unanimously carried.

Página 21

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 18

By consent agenda, Ms. Arndt moved for approval of the Committee’s recommendation, seconded by Dr. Pillsbury and carried by a unanimous roll call vote (Sudler absent).

Loockerman Plaza Pedestrian Improvements Update (Paul Moser, DelDOT, and Jason Lyon, Assistant City Manager) Mr. Jason Lyon, Assistant City Manager, introduced Mr. Paul Moser, Professional Engineer, DelDOT Active Transportation and Community Connections, for an update on the pedestrian improvements discussed in April. Mr. Moser commended the city for initiating the East Loockerman Street trial and stated that a four-mile- per-hour reduction in 85th-percentile speed was meaningful.

Mr. Moser explained that the Dover/Kent County Metropolitan Planning Organization had brought the Loockerman Plaza project to DelDOT. The area’s high pedestrian use and connectivity needs gave it a strong ranking. The concept focused on slowing traffic, providing formal midblock crossings, improving transit access, connecting sidewalks, and making the Federal Street crossing clearer and safer. Proposed pedestrian-activated rectangular rapid flashing beacons would improve drivers’ awareness and yielding.

Mr. Moser described a crossing connecting the library area to Federal Street, curb extensions to shorten crossing distances and improve sightlines, and a bus boarding area consistent with DART’s preference for boarding in the travel lane. The concept included additional green space, an extended median crossover, and a curb extension near the library to make the crossing more visible. Mr. Moser described extending the median island near the church to accommodate a six-foot walkway with a grass buffer, adding crossings along the plaza and at Federal Street, and providing a crossing near the coffee shop beyond the PNC Bank entrance. He proposed a No Left Turn restriction at the bank crossover. Fully closing that crossover by extending the medians would exceed the project’s current scope and budget.

Mr. Moser expected access to be maintained through partial closures, flaggers, parking restrictions, and temporary closure of a median crossover as needed. The project remained at the concept stage, so a construction schedule was not yet available. He stated that any closure would be coordinated with the city.

Mr. Anderson thanked the presenters and stated that the concept reflected his understanding of the earlier discussion, including the requested crosswalk serving City Hall.

Ms. Arndt asked that materials fit the historic downtown setting and stated that asphalt would not be appropriate there. She also expressed concern that a bus boarding in the lane would stop traffic and preferred maintaining the ability for vehicles to maneuver around it.

Mr. Moser stated that there might be sufficient width for vehicles to pass a stopped bus, but he would confirm that. He explained that in-lane boarding was preferred

Página 22

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 19

by DART and could avoid parked vehicles obstructing accessible loading. He asked for city preferences on brick or concrete sidewalks. DelDOT generally favored concrete for accessibility but could accommodate brick in recognition of the historic setting.

Responding to Mr. Rocha, Mr. Moser stated that there was adequate room. He anticipated impacts to approximately two spaces near the library, potentially reducible to one, and approximately three spaces near the bus boarding area where parking could interfere with transit access. He stated that tree limbs would be trimmed as necessary and that the city would likely be responsible for long-term maintenance. The grass buffer could also be adjusted to address clearance.

Mr. Moser proposed a public workshop tentatively on November 10, potentially at the library. Preliminary plans would be sent to Mr. Lyon for review and could incorporate feedback about materials and maintenance. The goal was to complete design in early 2027, with possible construction in late 2027, subject to funding, inflation, and other potential delays.

This item was informational; committee action was not required.

Mr. Boggerty moved for adjournment of the Safety Advisory and Transportation Committee meeting, hearing no objection the meeting adjourned at 9:45 p.m.

LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE

The Legislative, Finance, and Administration Committee met with Chairman Anderson presiding.

Adoption of Agenda
Ms. Arndt moved for adoption of the agenda, seconded by Mr. Rocha and
unanimously carried.

Get Work Foundation Presentation – Youth Sports and Community Center Feasibility Study Proposal (Dante Daniel, Chief Operating Officer, Terez Trott, Chief Executive Officer) Mr. Terez Trott, Chief Executive Officer and Co-Founder, and Mr. Dante Daniel, Chief Operating Officer, Get Work Foundation, presented a request for up to $50,000 from the economic development fund for an independent market, financial feasibility, and economic-impact study of a youth sports and community center. They emphasized that the request did not approve construction, debt, operations, a site, or a particular building. The study could recommend proceeding, changing the concept, phasing development, relocating, or stopping.

Mr. Trott stated that the study would test demand, assess responsible operations, compare potential sites and facility sizes, estimate costs and economic benefits, and identify realistic funding options. He described a community survey with 609

Página 23

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 20

responses, including 597 Delaware residents. Nearly 96 percent supported exploring the center, and nearly 90 percent indicated that their households would likely use it. Youth recreation was the highest priority, with safety, after-school activities, health and wellness, and workforce development also identified. He acknowledged that a community survey did not substitute for a feasibility study.

Mr. Trott discussed an increase in Kent County juvenile arrests and clarified that arrests were not a count of unique young people and did not establish that the absence of a sports center caused crime or that a center would reduce it. He presented supervised activities, mentorship, leadership, employment pathways, and other supports as elements worth evaluating within the city’s broader prevention efforts.

Mr. Trott described a year-round concept that could include sports courts, indoor turf, training, ice activities, education, workforce programming, wellness, and virtual golf. The study would identify which uses and scale were sustainable. He stated that recurring tournaments might bring visitors to hotels, restaurants, retailers, and entertainment businesses, while emphasizing that youth sports were not being equated with NASCAR. He cited state sports-tourism spending and grant programs as examples of an economic development opportunity, with no guarantee of funding.

Mr. Daniel described planning scenarios in the proposal, including an illustrative established-facility scenario of sixteen tournaments, approximately 14,000 visitors, and roughly $3 million in annual activity. He stressed that those figures were scenarios rather than forecasts or guarantees and that an objective study was needed. He acknowledged the city’s deficit, budget reductions, and increased revenue measures and stated that the proposal sought to explore new activity without increasing residents’ taxes.

Mr. Daniel identified potential state sports-tourism and community redevelopment funding, as well as USDA community-facility opportunities. He cited DE Turf and Dover’s existing sports-related visitor activity and described an interest in bringing recurring tournaments to Dover. He referenced Spooky Nook in Pennsylvania as a case study in the proposal, while explaining that the study would determine what was realistic locally.

Mr. Daniel described a possible relationship among the Dover Mall area, Bally’s, and Delaware State University (DSU), intended to create an economic and community hub rather than separate activities. He reported meeting with DSU President Tony Allen about indoor turf, internships, retaining graduates, and possible University land near Sam’s Club. A convention component for University events had been discussed as a potential condition of that collaboration. He stressed that those ideas remained subject to feasibility review.

Mr. Daniel stated that the foundation had met with three potential consulting firms and selected a preferred advisor based on expertise in market demand, feasibility, economic impact, and operations, prior Delaware work, and a proposed flat $50,000

Página 24

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 21

fee. He anticipated a study lasting approximately twelve weeks. He stated that the resulting study would be public and available to other parties, rather than reserved for the foundation.

Mr. Daniel described prospective investor discussions involving an emerging basketball player and his family, New Balance, and Klutch Sports. He stated that an independent study and evidence of city support would strengthen future discussions. He also described a backpack, clothing, and sneaker distribution event undertaken with New Balance as part of youth and community engagement. Those discussions were presented as potential opportunities rather than committed project financing.

The presenters described development in phases: feasibility analysis; stakeholder and investor engagement; possible construction over two to three years; operational planning and staffing; and program development. They expressed a preference for exploring the Dover Mall area and envisioned a community center during the week and revenue-producing tournaments on weekends. Programs could draw on local expertise in barbering, information technology, wellness, social work, and other fields. They reiterated that the city’s requested investment was for a third-party study and that the foundation did not seek to receive or control the study funds.

Dr. Sudler commended the preparation, acknowledgment of the City’s fiscal constraints, and attention to youth social and emotional needs. He encouraged the presenters to attend the October 7 Mayor’s Blue Ribbon Opioid Use Disorder Task Force meeting and explain how the concept might align with youth prevention and remediation priorities. He stated that local or state opioid funding could be another avenue to explore but did not commit the task force to funding the request. Joshua Pritchett, age ten, supported the center as a place for sports, school support, mentoring, and belonging, and described traveling outside Dover for tournaments.

Ramar Prince Jr., age eleven, supported the center as a place for opportunities to learn teamwork, discipline, responsibility, and leadership.

Responding to Mr. Boggerty, Mr. Daniel stated that other facilities existed, but that access and hours did not fully meet youth needs. He emphasized the presenters’ Dover roots, the desire to revitalize local activity, and the need to let an independent consultant evaluate the concept. He stated that city participation could strengthen applications to other funders.

Mr. Lewis commended the presentation but reiterated that available funding remained the central issue. He encouraged an economic development application meeting the established criteria.

Responding to Mr. Lewis, Mr. Daniel stated that the intent was to provide accessible programming for youth and underserved residents, with age-based charges and other financial details to be evaluated through the study. He stated that

Página 25

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 22

DSU’s resources were committed to other facilities and described collaboration involving land and shared facilities rather than an immediate funding commitment. Mr. Daniel added that the foundation believed the proposal met multiple economic and community development criteria and that previously reserved Garrison Oak funds had been retained for economic development rather than transferred to cover the general fund deficit. Responding to Ms. LaChelle Paul, Mr. Daniel stated that staffing levels depended on the study’s findings, but that security, custodial, and other positions, as well as workforce training, were envisioned. When she asked about opioid prevention, he welcomed a holistic approach incorporating drug prevention, mental health, workforce development, and partnerships with organizations that needed a place to deliver services.

William Holden, Dover, supported local sports opportunities for children and potential business activity from tournaments, including photography, vendors, food service, and cleaning.

Mike Conway, co-founder of a soccer venture with Dr. Jackson, described his experience in professional and youth soccer and offered to assist with programming, events, partnerships, and introductions to prospective sponsors. He clarified that no teams or sponsors were already committed.

Damar Miller, Capital Park, supported additional youth programming and offered barbering mentorship and skills training.

Responding to Bonnie Pennington, Mr. Daniel stated that the proposal addressed persons of all abilities and described plans to discuss partnerships with an autism- focused organization.

Mr. Trott added that special events were also envisioned.

Rosetta Brickhouse, an educator and former DSU facilities employee, supported the concept’s sports, economic, and workforce opportunities and offered assistance.

Larry Harvey, supported the potential for visitor spending and local business activity, citing his family’s experience traveling for youth sports.

Mr. Anderson stated that a feasibility study had value, but the economic development application process was closed. He suggested that staff explore combining this request with other similar proposals, including a swim center, into a city-owned study that participating organizations could use. He stated that a shared study could reduce duplication and taxpayer expense.

This item was informational; committee action was not required.

Página 26

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 23

Dr. Sudler moved to recommend referring the proposal back to staff for
review. The motion was seconded by Mr. Boggerty and carried, with Mr.
Garfinkel voting no.

By consent agenda, Ms. Arndt moved for approval of the Committee’s recommendation, seconded by Dr. Pillsbury and carried by a unanimous roll call vote (Sudler absent).

Mr. Boggerty took over as chair at 10:54 p.m.

Proposed Resolution No. 2026-12 – Implementing Recommendations of the Independent Investigation and Review Conducted by 21CP Solutions (Councilman Anderson) Mr. Anderson presented Proposed Resolution No. 2026-12 as a measure concerning administration and city procedures, rather than a judgment about particular individuals. He referenced Council’s Charter responsibilities and stated that the recommendations came from the independent 21CP Solutions review. The proposed resolution would direct staff to develop implementation measures within sixty days, allowing consideration of the needs of different departments, particularly the Police Department.

Mr. Anderson stated that the city’s handbook and practices should be consistent with its ethics provisions and other existing requirements. He believed the recommendations could be implemented through a resolution because the ordinances were not themselves deficient; the concern was their interpretation and application. He urged public consideration of the recommendations.

Mr. Lewis moved to release the complete 21CP report for public transparency.

Mr. Anderson stated that the City Solicitor had advised that releasing the report, particularly without redactions, would violate legal protections, including the Law- Enforcement Officers’ Bill of Rights. He urged members to follow counsel’s advice.

Mr. Lewis moved to release the full report of 21CP for public transparency. The motion was seconded by Mr. Garfinkel.

Mayor Christiansen referenced accusations made during the previous evening’s meeting alleging that he and Chief Johnson had violated ethical standards. He stated that the matters had been investigated numerous times, including by the Department of Justice, internally, and through an investigation for which the city paid approximately $50,000.

Mayor Christiansen reminded Council that the terms and conditions of Chief Johnson’s employment had been approved by Council following a recommendation from a committee consisting of city staff and members of Council. He emphasized that he took his responsibilities seriously and stated that he received weekly accountability reports regarding the Chief’s activities, including detailed emails concerning his work product.

Página 27

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 24

Mayor Christiansen stated that he believed the resolution before Council was premature and concurred with Councilman Lewis that the public had a right to know the contents of the investigative report. He stated that he had nothing to shield from the report and insisted that, before Council acted on the resolution, the city had an obligation to the public and to those investigated to release the report.

He emphasized his belief in transparency, stating that if he had done something wrong, he should be held accountable, but if he had not, he should not be held responsible for wrongdoing. He further stated that Council should not question the Chief regarding matters related to the terms of his employment because Chief Johnson reported directly to him. Mayor Christiansen accepted responsibility for the terms under which the Chief was hired and for his performance of those duties.

Mayor Christiansen reiterated that the city had paid for the investigative report and maintained that transparency should prevail. He stated that he had nothing to hide and had acted within the confines of the employment agreement recommended by the committee and subsequently presented to and approved by a previous Council. He believed the city had an obligation to maintain those standards for the current Chief and stated that future employment terms could be changed after Chief Johnson’s tenure if Council wished to do so.

Mayor Christiansen also recalled that Council had discussed the matter in Executive Session approximately two or three times roughly two years earlier and that no action had been taken at that time. He concluded by reiterating that, in the interest of transparency, the investigative report should be released to the public because the public had ultimately paid for it.

Dr. Sudler thanked the Mayor for supporting transparency and asked whether Chief Johnson also agreed to release, expressing concern that the city and residents could face litigation.

Mr. Anderson raised a point of order, stating that the Chief was represented by counsel and should not be questioned about the matter without his attorney present, and that counsel had objected.

Mayor Christiansen recommended tabling the resolution for additional consideration while reiterating that he supported release of information concerning him on advice of his attorney.

Ms. Arndt stated that she had no objection to transparency but recalled the City Solicitor advising against release. She would not support the motion without revisiting that advice.

Vonderlear Smack, Dover, requested release of the investigative findings and supporting materials to the fullest extent legally permitted, with redactions and explanations for any lawful withholding. She asked for the contract, invoices, total cost, a release date, opportunities for public questions, and a public progress report

Página 28

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 25

on implementation. She stated that proposed policy changes did not explain which allegations were substantiated or why recommendations were made.

LaChelle Paul, Dover, similarly requested lawful redaction and disclosure so residents could assess how the proposed resolution related to the investigation’s findings.

Dr. Sudler asked whether the Solicitor could be contacted before a decision.

Mr. Boggerty noted that this would require a pause and that the hour was late.

Mr. Anderson referred to legal advice concerning a FOIA appeal and stated that privileged advice could not be discussed publicly without an appropriate executive session.

Mayor Christiansen cautioned Council to proceed carefully and suggested that the matter be tabled until additional information could be obtained. He reiterated the importance of transparency and stated that he had no objection to the information being made public.

Mayor Christiansen stated that the terms of Chief Johnson’s hiring and accountability had been placed under his responsibility and that he accepted responsibility for those matters. He maintained that Chief Johnson had acted ethically regarding the concerns being raised.

Mayor Christiansen again cautioned Council to “tread lightly,” noting his many years of experience with the city, and concluded by emphasizing that transparency was owed to the public.

Mr. Rocha supported disclosure but asked for the City Solicitor’s reasons for withholding the report.

Mr. Anderson identified personnel matters, the Law-Enforcement Officers’ Bill of Rights, and the absence of waived rights, while stating that other reasoning could not be discussed publicly. When the Clerk’s Office clarified that the City Solicitor’s official written response on the referenced FOIA appeal was not yet public, Mr. Anderson stated that it could not be disclosed in the meeting. He noted that any committee action would still require Council consideration.

Mr. Lewis reiterated that he wanted his request for full disclosure on the record and thanked the Mayor for supporting it.

Mr. Rocha asked for further legal advice about whether the report could be released with redactions. He stated that the resolution did not provide enough information for him to support forwarding it at that time.

Dr. Sudler requested clarification that the pending motion concerned release of the full report and was separate from the proposed resolution.

Página 29

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 26

Ms. Arielle Rivera, Assistant City Clerk, read that Mr. Lewis moved to release the full report of the 21CP findings for public transparency. The motion was seconded by Mr. Garfinkel.

Responding to Mr. Rocha, Mr. Anderson explained that the resolution concerned adopting policy recommendations and that Council had read the report and could evaluate those recommendations.

Dr. Sudler emphasized public servants’ responsibility for accountability and transparency and commended the Mayor’s willingness to permit disclosure, while acknowledging that legal concerns remained.

Ms. Paul reiterated that the public had expected transparency from the independent investigation and needed the findings to assess the proposed policy changes.

Ms. Arndt recommended tabling the resolution and revisiting disclosure with the City Solicitor, including the possibility of redactions. She cautioned against acting contrary to legal advice.

Dr. Sudler asked Mr. Lewis to withdraw his motion so the city could first obtain advice about potential legal consequences. He suggested revisiting the matter promptly, potentially through a special meeting.

Mr. Lewis declined to withdraw the motion, stated that the issue had remained unresolved for too long, and called for a vote.

Mr. Lewis moved to release the full report of 21CP for public transparency. The motion was seconded by Mr. Garfinkel and failed by a roll call vote of two (2) yes (Rocha, Lewis) and six (6) no (Boggerty, Anderson, Arndt, Sudler, Shevock, Garfinkel), and three (3) absent (Hall, Pillsbury, Neil).

Ms. Arndt moved to table the Proposed Resolution No. 2026-12. The motion was seconded by Mr. Rocha and unanimously carried.

By consent agenda, Ms. Arndt moved for approval of the Committee’s recommendation, seconded by Dr. Pillsbury and carried by a unanimous roll call vote (Sudler absent).

Mr. Anderson resumed as chair at 11:42 p.m.

Community Riverwalk Assessment Grant (Jason Lyon, Assistant City Manager) Mr. Jason Lyon, Assistant City Manager, reviewed the proposal regarding the Community Riverwalk Assessment Grant.

Mr. Boggerty moved to recommend accepting the staff recommendation authorizing the City Manager to enter into an agreement with the Downtown Dover

Página 30

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 27

Partnership for the allocation of the applicable grant funding. The motion was seconded by Mr. Rocha.

Staff recommended authorizing the City Manager to enter into an agreement with the Downtown Dover Partnership for the allocation of the applicable grant funding.

Responding to Mr. Lewis, Mr. Lyon stated that the city could not receive EPA cleanup funding for the site because the city, as the owner, had caused the contamination.

Responding to Mr. Lewis, Mr. Lyon stated that no land would be conveyed under this proposal. He explained that DDP had received a multipurpose grant that could support two activities described in the proposal: a building assessment and abatement, and a conceptual plan for long-term use.

Mr. Boggerty moved to recommend authorizing the City Manager to enter into an agreement with the Downtown Dover Partnership for the allocation of the applicable grant funding. The motion was seconded by Mr. Rocha and unanimously carried.

By consent agenda, Ms. Arndt moved for approval of the Committee’s recommendation, seconded by Dr. Pillsbury and carried by a unanimous roll call vote (Sudler absent).

Mr. Anderson moved for adjournment of the Legislative, Finance, and Administration Committee meeting, hearing no objection the meeting adjourned at 11:44 p.m.

Mr. Anderson moved for adjournment of the Council Committee of the Whole meeting, hearing no objection the meeting adjourned at 11:45 p.m.

By consent agenda, Ms. Arndt moved for acceptance of the Council Committee of the Whole Report, seconded by Dr. Pillsbury and carried by a unanimous roll call vote (Sudler absent).

MONTHLY REPORTS – AUGUST 2026

By motion of Ms. Arndt, seconded by Dr. Pillsbury, the following monthly reports were accepted by consent agenda:

City Council’s Community Enhancement Fund Report
City Manager’s Report
Controller/Treasurer’s Budget Report
Fire Chief’s Report
Police Chief’s Report

APPOINTMENTS/REAPPOINTMENTS RECOMMENDED BY MAYOR

CHRISTIANSEN

By consent agenda, Ms. Arndt moved for approval of the following appointment, as recommended by Mayor Christiansen. The motion was seconded by Dr. Pillsbury and carried by a unanimous roll call vote (Sudler absent).

Página 31

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 28

Planning Commission – Three-Year Term to Expire June 2029 A. Mark E. Reaves

FINAL READING – PROPOSED ORDINANCE #2025-19 – ADOPTION OF THE 2024 ICC CODES The First Reading of the Proposed Ordinance was accomplished during the Council Meeting of September 28, 2026. Council President Neil reminded members of the public that copies of the proposed ordinances were available at the entrance of the Council Chambers or on the City’s website at www.cityofdover.gov under “Government”.

Mr. Jason Osika, Deputy Director of Emergency Management and Fire Marshal, reviewed the proposed replacement of the City’s 2009 building codes with the 2024 International Building, Residential, Existing Building, Property Maintenance, Fire, and Swimming Pool and Spa Codes. He explained that energy, mechanical, plumbing, and fuel gas requirements remained under statewide codes and that the ICC Performance Code would be repealed. Projects already under active design could proceed under the prior codes if the owner elected that option and provided documentation.

Mr. Osika explained that the tiny-house construction standards did not authorize uses or locations otherwise prohibited by the Zoning Ordinance. He stated that residential sprinkler requirements applied to new one- and two-family dwellings and townhouses and did not require existing homes to be retrofitted solely because of the code adoption. He described the Committee amendment addressing renovations that meet the 50% threshold, under which sprinklers would be required in the new area without requiring the existing residence to be retrofitted.

Mr. Lewis expressed concern about sprinkler requirements for additions and renovations, their cost to homeowners, and the reliability of sprinkler systems. Responding to Mr. Boggerty, Mr. Osika explained how the renovation threshold could apply to a finished basement and stated that residential sprinkler systems could use residential water lines and materials, rather than the larger systems typically required for commercial projects. Mr. Rocha asked whether sprinklers could be installed in only one portion of a home, and the Mayor confirmed that this was possible.

Ms. Arndt moved that the Final Reading of proposed ordinance #2025-19 be acknowledged by title only, seconded by Mr. Boggerty and unanimously carried.

Mr. Anderson moved to adopt the Committee Amendment as presented. The motion was seconded by Ms. Arndt and carried with Mr. Lewis voting no (Sudler absent).

Mr. Anderson explained that the amendment was intended to protect owners of existing homes from the cost and difficulty of retrofitting an entire residence when undertaking qualifying new work. He supported adoption of the ordinance as amended, citing fire safety concerns associated with modern construction materials while acknowledging housing affordability concerns.

By motion of Ms. Arndt, seconded by Dr. Pillsbury and carried by a roll call vote of seven (7) yes (Hall, Boggerty, Anderson, Pillsbury, Arndt, Rocha, Neil), one (1) no (Lewis), and one (1) absent (Sudler), Ordinance #2025-19 was adopted as amended, as follows: BE IT

Página 32

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 29

ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:

That Chapter 22 – Buildings and Building Regulations, Article III – Building Code, be amended by inserting the text indicated in bold, blue, italics and deleting the text indicated in red strikeout as follows:

Sec.22-61. – Adopted.

TRANSITION, REPEALER, SEVERABILITY, AND EFFECTIVE DATE

Transition rule: This ordinance takes effect immediately upon adoption. Notwithstanding its immediate effectiveness, a project may, at the owner’s or applicant’s written election, be designed, submitted, reviewed, and permitted under the codes in effect immediately before this ordinance if the owner or applicant demonstrates that: (1) a registered design professional was retained for the project under a written contact or other written engagement before the effective date; and (2) that design professional performed active design work on the project during the six months immediately preceding the effective date The building official may require the written contact or engagement together with dated drawings, specifications, invoices, progress reports or other records reasonably sufficient to establish eligibility. This exception applies only to the project and scope documented and does not waive any applicable zoning, floodplain, fire, utility, licensing or other approval. A permit validly issued before the effective date remains governed by the prior code while the permit remains valid.

Repealer: All ordinances or parts of ordinances in conflict with this ordinance are repealed to the extent of the conflict. The repeal of the ICC Performance Code for Buildings and Facilities is express and complete.

Severability: If any provision, sentence, clause, section, or application of this ordinance is held invalid, the invalidity does not affect any other provision or application that can be given effect without the invalid provision or application.

Effective date (***Insert final adopted date)

(a) International Building Code adopted.A copy of the “International Building Code, 2024 Editions,” as published by the International Code Council , and is available at the International Code Council Website (codes.iccsafe.org) and is herby adopted as the Building Code of the City of Dover for the control of buildings and structures. The code is adopted as if fully set out herein, with the following additions insertions, deletions and changes: Section 101.1 Title. Insert “City of Dover, Delaware.”

105.2 Work exempt from permit.

The published 2024 list is adopted

Página 33

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 30

Local approvals preserved. An exemption from a building permit does not exempt any work or development activity from zoning review, a zoning permit, floodplain review, site-plan review, sign approval, utility or right-of-way approval, or any other permit or approval required by the Dover Code or applicable law. This includes accessory structures, buildings, fences and signs.

Section 105.5. Expiration. Insert the following text following the word “demonstrated” at the end of the section: “and does not exceed the 3 year time limit as stated in 105.5.2.”; and insert the following subsections:

105.5.1. Time limitation of permit. A permit for any activity for which a permit is required shall be valid for 180 days from the date of issuance. One 180-day extension may be granted without additional charge to the permit holder. Additional 180-day extensions may be granted with payment of a renewal fee as specified in Appendix F: Fees and Fines.

105.5.2. Completion of construction. All construction for which a building permit is required must be completed and pass final inspection within three (3) years after issuance of the building permit. If not completed within three (3) years, a new building permit must be obtained and any applicable fees paid. Fees paid under the expired permit are not credited unless the building official approves a credit in writing.

SECTION 107 SUBMITTAL DOCUMENTS

107.1 Submittal documents. Insert: Construction documents and other data shall be submitted in one paper set and in an approved digital format. One reviewed paper set or an approved digital set shall be returned or made available to the applicant. Documents involving the practice of architecture or engineering shall be prepared, signed, sealed and dated by a Delaware- registered design professional as required by Delaware professional-registration law. The building official may require additional documents where special conditions exist and may waive documents not required by law when they are unnecessary to determine code compliance. The building official has the authority to remove the requirement for a paper set.

109.3 BUILDING PERMIT VALUATIONS Insert: “See Section 22-65 and Appendix F— Fees and Fines of the City of Dover Code of Ordinance.” New-construction valuation shall be calculated using the most recently published ICC Building Valuation Data table unless otherwise approved in writing by the building official.

SECTION 113 BOARD OF APPEALS. See Section 22-1 of the City of Dover Code of Ordinance.”, Construction and property maintenance code board of appeals.

Section 114.4 Violation Penalties. Any person who violates a provision of this code or fails to comply with any of the requirements thereof or who erects, constructs, places, alters, repairs, a building or structure in violation of the approved construction documents or directive of the building inspector, or of a permit or certificate issued under the provisions of this code shall be charged with a violation of this code and be guilty of a misdemeanor, punishable by a fine as

Página 34

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 31

provided for in Appendix F—Fees and Fines, or by imprisonment thirty (30) days, or both such fine and imprisonment. Each day that a violation continues shall be deemed a separate offense.

Section 115.3 Unlawful continuance. Insert: "Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be charged with a violation of this section and shall be fined as provided for in Appendix F—Fees and Fines. Each day that a violation continues shall be deemed a separate offense." in place of: "Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform a violation or unsafe condition, shall be subject to penalties as prescribed by law."

Energy and flood-resistant construction Section 1301.1.1, Criteria. Buildings shall be designed and constructed in accordance with the Statewide Energy Conservation Code then in effect under 16 Del. C. ch. 76 and 7 DE Admin. Code 2101

Section 1612.3. The flood hazard areas identified by the Federal Emergency Management Agency in the Flood Insurance Study for Kent County, Delaware, and Incorporated Areas, effective July 7, 2014, together with the accompanying Flood Insurance Rate Maps and all subsequent amendments, revisions and Letters of Map Change, are adopted by reference. Chapter 50 of the Dover Code controls where it is more restrictive.

Section 1612.4.1 Elevation requirements. The minimum elevation shall be the elevation required by ASCE 24, the design flood elevation, or the base flood elevation plus 18 inches, whichever is highest.

Appendix G, Flood-Resistant Construction. Appendix G is adopted in its entirety. Chapter 50 of the Dover Code controls where it is more restrictive.

(b) International Residential Code Adopted. A copy of the International Residential Code for One- and Two-Family Dwellings, 2024 Edition, as published by the International Code Council, shall be authenticated and recorded by the City Clerk and is adopted for regulating one- and two-family dwellings and townhouses within its published scope, subject to the following local amendments:

Section 101.1 Title. Insert "City of Dover, Delaware" in place of "[NAME OF JURISDICTION]"

Section R101.2, Scope. A home day-care facility serving twelve or fewer children may be within the scope of this code only as provided in Section 22-61(a) and Appendix BD. Adoption of Appendices BB or BC does not authorize a tiny house or accessory dwelling unit where the use, density, lot, dimensional, parking or other development standard is not permitted by the Dover Zoning Ordinance.

Página 35

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 32

Section R105.2. Work exempt from permit, Building - 1. Insert "120" in place of "200". Delete numbers 2 through 5 in their entirety. Replace number 7 with the following: "Prefabricated swimming pools accessory to a Group R-3 occupancy provided that the swimming pools are not designed to retain a depth of 24" (610 mm) or more, and do not exceed 5,000 gallons (18925L) and installed entirely above ground. An exemption from a building permit does not exempt any work or development activity, including an accessory structure or deck, from zoning review, a zoning permit, floodplain review or another approval required by the Dover Code or applicable law.

SECTION R106 CONSTRUCTION DOCUMENTS

R106.1 Submittal documents. Insert: Construction documents and other data shall be submitted in one paper sets and an approved digital format. One reviewed paper set or approved digital set shall be returned or made available to the applicant. Documents shall be prepared, signed, sealed and dated by a Delaware-registered design professional where required by Delaware law. The building official may require additional information or waive documents not required by law when they are unnecessary to determine compliance. The building official may change the paper requirement as needed.

Exception: The building official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for is such that review of construction documents is not necessary to obtain compliance with this code.

SECTION R108 FEES

R108.2 Schedule of permit fees. Insert "see Section 22-65 Fees for permits " in place of "in accordance with the schedule as established by the applicable governing authority".

SECTION R112 BOARD OF APPEALS See Chapter 22 - Buildings and Building Regulations, Article I - In General, Sec. 22-1 Construction and property maintenance code board of appeals.

SECTION R113 VIOLATIONS

Section 113.4 Violation Penalties. Insert "See Section 22-61 (a) Section 113.4 Violation Penalties" in place of "Any person who violates a provision of this code or fails to comply with any of the requirements thereof or who erects, constructs, places, alters, repairs, a building or structure in violation of the approved construction documents or directive of the building inspector, or of a permit or certificate issued under the provisions of this code, shall be subject to penalties as prescribed by law."

SECTION R114 STOP WORK ORDER

Section R114.2 Unlawful continuance. Insert: "See Section 22-61 (a) International Building Code, Section 114.3 Unlawful continuance" in place of "Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform a violation or unsafe condition, shall be subject to penalties as prescribed by law."

Página 36

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 33

TABLE R301.2(1) CLIMATIC AND GEOGRAPHIC DESIGN CRITERIA

Status Snow Wind Seismic Weather / Termite Winter / Flood Frost AFI / Mean 115 mph; topographic effects, Chapter special Yes 50; July 7, Severe / 18°F / 596 Adopt 25 psf wind A (moderate 2014 24 in. / 54°F region and to heavy) FIS/FIRM, wind-borne as revised debris zone: No Wind exposure category and site-specific design conditions remain determined under the published code.

Table R301.2(1), footnote (g): September 16, 1982, Flood Insurance Study for Kent County and Incorporated Areas, dated July 7, 2014, or as subsequently amended or revised.

Table R301.5 MINIMUM UNIFORMLY DISTRIBUTED LIVE LOADS. Insert the following at the end of footnote "c": Calculations demonstrating compliance with the minimum live load shall be provided by a registered design professional for stairs and fire escapes that do not have additional "stringer" or "carriage" support located and equally distributed in the middle section of the stair width.

Adopt as published.

Applicability to existing residential structures and additions. Section R309 applies to newly constructed one- and two-family dwellings and townhouses. No automatic residential sprinkler system shall be required in any portion of a one- or two-family dwelling or townhouse that existed before an addition, alteration, repair, renovation or other work, even where the scope, value, floor area, percentage or other threshold associated with the work would otherwise require that existing portion to comply with current-code automatic-sprinkler requirements. Where an addition, considered independently of the existing portion, meets or exceeds an otherwise applicable threshold requiring an automatic residential sprinkler system, the system shall be installed in the addition only and shall not be required to extend into the existing portion. A system required in an addition shall be designed and installed in accordance with Section R309.1.1 or R309.2.1, as applicable. This local amendment does not waive the sprinkler requirement for a newly constructed dwelling or townhouse and does not waive any fire- or life-safety requirement other than the installation or extension of an automatic residential sprinkler system into the existing portion.

Página 37

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 34

Under “Home day care serving twelve or fewer children. (6): A newly constructed dwelling shall comply with IRC Section R309. No automatic residential sprinkler system shall be required in the existing portion of a dwelling solely because the dwelling is used for child day care or because work to the dwelling meets a current-code threshold. An addition shall be governed by the local amendment titled “Applicability to existing residential structures and additions” in Section 22-61(b).

Section R329.2, Stationary engine generators—Installation. Replace the reference to IRC fuel-gas and electrical chapters with “the Statewide Fuel Gas Code and the edition of NFPA 70 adopted and amended by the Delaware State Fire Marshal.”

Section R306.1.4, Establishment of design flood elevation. The design flood elevation shall be established using Chapter 50 and the FEMA Flood Insurance Study and Flood Insurance Rate Maps for Kent County, Delaware, and Incorporated Areas, (Date as of this adoption) effective July 7, 2014, as amended or revised.

Section 903.2.1, Group A. The published requirements of Section 903.2.1 remain in effect. The additional local sprinkler requirements in Section 46-162 are supplemental; where requirements differ, the more restrictive requirement applies.

Section 1105.1.1 and Table 1105.1.1. Retain the published section and table. In addition, each main public entrance to a newly constructed place of public accommodation shall have an automatic door or a qualifying calling device as required by 6 Del. C. § 4504(d).

Sections R306.2.1 and R306.3.2, Elevation requirements. Where the published code establishes elevation using the base flood elevation, the required elevation shall be the design flood elevation or the base flood elevation plus 18 inches, whichever is higher. In Zone AO, the lowest floor shall be elevated above the highest adjacent grade by the mapped depth plus 18 inches, but not less than 3.5 feet where no depth number is specified. Chapter 50 controls where it is more restrictive.

CHAPTER 4 FOUNDATIONS

SECTION R403 FOOTINGS

R403.1.1 Minimum size. All continuous footings shall be a minimum of 8 inches in depth by 16 inches in width. Footings shall be sized to support imposed loads. Footing projections, P, shall be not less than 2 inches (51 mm) and shall not exceed the footing thickness. Footing thickness and projection for fireplaces shall comply with Section R1001.2. Footings supporting piers and columns shall be sized for tributary load and allowable soil pressure under Table R401.4.1. Footings for wood and precast foundations shall comply with the applicable published details, tables and figures in Sections R403.2 and R403.4. Exceptions:

Página 38

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 35

  • 1.Minimum footings for single-story decks shall be three times the widest nominally measured side of the post and shall be sized to support imposed loads; interior posts ordinarily support more load than perimeter posts.
  • 2.Decks having vertical members spaced 6 feet (1,829 mm) on center or less may be placed on a 4-inch (101 mm) concrete pad where the vertical members are placed 12 inches (305 mm) inside the pad perimeter, and all corners are anchored with approved anchoring devices. Decks 20 feet (6,096 mm) or more in length shall have two additional anchors on each side at mid-span.
  • 3.Residential accessory structures less than 300 square feet (27.9 m²), other than pole buildings and garages, shall be leveled and secured with tie-downs or equivalent manufactured-home anchoring devices, one at each corner. Structures 20 feet (6,096 mm) or more in length shall have two additional anchors on each side at mid-span. Lumber and wood siding from grade to 8 inches (203 mm) above finished grade shall be pressure treated in accordance with Section R317.
  • 4.Prefabricated room enclosures shall be placed on an approved support system in accordance with the manufacturer’s installation instructions.

R403.1.3 Seismic reinforcing. Delete in its entirety.

R403.1.4 Minimum Depth. Insert "24" in place of "12".

Amend R403.1.4.1 Frost protection—Exceptions to read:

The exception is revised to coordinate with Section R403.1.1: freestanding accessory structures of less than 300 square feet, other than pole buildings and garages, may use the anchoring method in Section R403.1.1, Exception 3. All pole buildings, garages and accessory structures of 300 square feet or more shall have frost-protected footings. Footings shall not bear on frozen soil unless the frozen condition is permanent.

Chapter 11, Energy efficiency. Delete the chapter and substitute: “Buildings shall comply with the Statewide Energy Conservation Code then in effect under 16 Del. C. ch. 76 and 7 DE Admin. Code 2101.”

Chapters 12 through 43. Delete Chapters 12 through 43, including all tables and figures. Mechanical, fuel-gas and plumbing work is governed by the applicable Statewide Codes, and electrical work is governed by NFPA 70 as adopted and amended by the Delaware State Fire Marshal.

IRC appendices adopted Appendix BB, Tiny Houses, is adopted in its entirety. Appendix BC, Accessory Dwelling Units (ADU), is adopted in its entirety. Appendix BD, Home Day Care Occupancy—R-3, is adopted in its entirety. Appendix BO, Existing Buildings and Structures, is adopted in its entirety.

Página 39

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 36

Appendices BB and BC regulate construction only and do not authorize a land use or dwelling unit not permitted by the Dover Zoning Ordinance. Appendix BD is subject to the licensing, zoning and inspection conditions in Section 22-61(a). Appendix BO applies only to buildings within the IRC scope; Chapter 50 and any more restrictive applicable provision control.

Appendix NE, Electric Vehicle Charging Infrastructure, is not separately adopted because the Statewide Energy Conservation Code includes the state-adopted Appendix RE.

Subsection (c) is repealed in its entirety.

(c) International Existing Building Code. The International Existing Building Code, 2024 Edition, as published by the International Code Council, is adopted by reference for the repair, alteration, change of occupancy, addition and relocation of existing buildings, including historic buildings.

A copy shall be authenticated and recorded by the City Clerk. No IEBC appendix is adopted.

Section 202, General definitions. Add: “International Fuel Gas Code means the Statewide Fuel Gas Code; International Mechanical Code means the Statewide HVACR Code; International Plumbing Code means the Statewide Plumbing Code; and International Energy Conservation Code means the Statewide Energy Conservation Code.”

The proposed amendment changing the IEBC definition of “Existing building” from “building permit” to “certificate of occupancy” is deleted; the published definition is retained.

The proposed deletions of Sections 406, 806 and 1007 are deleted; those published sections are retained.

Appendix E is not adopted.

(d) Statewide Energy Conservation Code. Pursuant to 16 Del. C. ch. 76, the City shall enforce the Statewide Energy Conservation Code then in effect as adopted and amended by the Delaware Department of Natural Resources and Environmental Control or its successor. As of this draft, the statewide code is based on the 2024 IECC for residential construction and the 2024 IECC/ASHRAE 90.1-2022 for commercial and high-rise residential construction, including state-adopted Appendices RE and CB. The controlling edition and effective date are those established by state law and regulation; no local appendix of adoption dates is created. (e) International Swimming Pool and Spa Code.

The International Swimming Pool and Spa Code, 2024 Edition, as published by the International Code Council, is adopted by reference for the construction, alteration, movement, renovation, replacement, repair and maintenance of swimming pools, spas, hot tubs and aquatic facilities. A copy shall be authenticated and recorded by the City Clerk.

Página 40

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 37

Section 202, General definitions. Add the same Statewide Code definitions stated for IEBC Section 202 above.

Sections 305.4 and 305.5. The proposed local weakening of structure-wall and on-ground-pool barrier provisions is deleted. The published 2024 barrier provisions are retained without local amendment.

Section 406.2, Pool perimeter access. Delete the published subsection and substitute: “Walkways. Public swimming pools shall have walkways not less than 4 feet in width extending around the pool. Curbs and sidewalks around a public swimming pool shall have a slip-resistant surface and shall be arranged to prevent the return of surface water to the pool.”

BE IT FURTHER ORDAINED:

That Chapter 22 – Building and Building Regulations, Article V – Mechanical Code be amended by inserting the text indicated in bold, blue, italics, and deleting the text indicated in red strikeout as follows:

Sec. 22-141. – Adopted.

Pursuant to 24 Del. C. ch. 18, the City shall enforce the Statewide HVACR Code then in effect as adopted and modified by the Delaware Board of Plumbing, Heating, Ventilation, Air Conditioning and Refrigeration Examiners. As of this draft, the statewide code is based on the 2015 International Mechanical Code. The controlling edition and effective date are those established by state law and regulation. Local administrative amendments below apply only to the extent permitted by state law and approved by the State Board where approval is required.

Section 101.1 Title. Insert "City of Dover, Delaware" in place of "[NAME OF JURISDICTION]"

106.5 Fee Schedule. Insert "See DCO Section 22-145 and Appendix F-Fees and Fines. Section 106.5.3 Fee refunds. Delete in its entirety.

SECTION 108 VIOLATIONS

Section 108.4 Violation Penalties. See IBC Section 114.4 as locally amended in Section 22-61(a).

Section 108.5 Stop work orders. See IBC Section 115.3 as locally amended in Section 22- 61(a).

BE IT FURTHER ORDAINED:

Página 41

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 38

That Chapter 22 – Building and Building Regulations, Article VI – Plumbing Code be amended by inserting the text indicated in bold, blue, italics, and deleting the text indicated in red strikeout as follows:

Sec. 22-181. - Adopted. Statewide Plumbing Code. Pursuant to 16 Del. C. ch. 79, the City shall enforce the Statewide Plumbing Code then in effect as adopted and modified by the Delaware Division of Public Health. As of this draft, the statewide code is based on the 2021 International Plumbing Code. The controlling edition and effective date are those established by state law and regulation. Local water, wastewater and administrative requirements apply only to the extent allowed by state law. The International Private Sewage Disposal Code is not adopted because private sewage disposal is enforced by other authorities having jurisdiction.

Section 101.1 Title. Insert "City of Dover, Delaware" in place of "[NAME OF JURISDICTION]"

Section 106.6.2 Fee Schedule. Insert “See Section 22-185 and Appendix F—Fees and Fines.”

[JURISDICTION TO INSERT APPROPRIATE SCHEDULE]".

Section 106.6.3 Fee refunds. Delete in its entirety.

Section 108.4 Violation Penalties. Insert: See IBC Section 114.4 as locally amended in Section 22-61(a).

Section 108.5 Stop work orders. Insert See IBC Section 115.3 as locally amended in Section 22-61(a).

(b) Statewide Fuel Gas Code. Pursuant to 24 Del. C. ch. 18, the City shall enforce the Statewide Fuel Gas Code then in effect as adopted and modified by the Delaware Board of Plumbing, Heating, Ventilation, Air Conditioning and Refrigeration Examiners. As of this draft, the statewide code is based on the 2015 International Fuel Gas Code. The controlling edition and effective date are those established by state law and regulation.

(a) [Severability.] The severability paragraph formerly codified as subsection (c) is deleted; a single ordinance-wide severability clause appears below. Sections 22-182 through 22-186 otherwise remain unchanged.

BE IT FURTHER ORDAINED:

That Chapter 22 – Building and Building Regulations, Article VII – Property Maintenance Code be amended by inserting the text indicated in bold, blue, italics, and deleting the text indicated in red strikeout as follows:

Página 42

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 39

Sec. 22-221. – Adopted.

(a) A certain document, three copies of which are on file in the Licensing and Permitting Office of the city, being marked and designated as "The International Property Maintenance Code, 2024" as published by the International Code Council, be and is hereby adopted as the Property Maintenance Code of the City of Dover, in the State of Delaware; for the control of buildings and structures as herein provided; and each and all of the regulations, provisions, penalties, conditions and terms of said property maintenance code are hereby referred to, adopted, and made a part hereof, as if fully set out in this section, with the following additions, insertions, deletions and changes:

Section 101.1 Title. Insert "City of Dover, Delaware" in place of "[NAME OF JURISDICTION]"

SECTION 111 MEANS OF APPEAL See Chapter 22 - Buildings and Building Regulations, Article I - In General, Sec. 22-1 Construction and property maintenance code board of appeals.

103.1 Creation of enforcement agency. Insert “Department of Planning and Inspections” for the name of the department of building safety and “building official” for the title of the official in charge.

Section 302.4, Weeds. Insert “8 inches” in place of “[JURISDICTION TO INSERT HEIGHT IN INCHES].”

Section 304.14 Insect screens. Insert "March 1st to November 30th" in place of "[date] to [date]".

Section 602.3 Heat supply. Insert "September 15th to May 1st" in place of "[date] to [date]".

Section 602.4. Occupiable work spaces. Insert "September 15th to May 1st" in place of "[date] to [date]".

(b) It shall be unlawful for any person to violate any of the provisions of the publication adopted in subsection (a).

BE IT FURTHER ORDAINED:

That Chapter 46 – Fire Prevention and Protection, Article III – Fire Codes, Section 46-121. - Adopted be amended by inserting the text indicated in bold, blue, italics, and deleting the text indicated in red strikeout as follows:

Sec. 46-121. – Adopted.

(a) International Fire Code adopted. A certain document, three copies of which are on file in the Licensing and Permitting Office of the city, being marked and designated as "International Fire Code, 2024 Edition," as published by the International Code Council, be and is hereby adopted as the Fire Prevention Code of the City of Dover in the State of

Página 43

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 40

Delaware; for the control of buildings, structures and premises as herein provided; and each and all of the regulations, provisions, penalties, conditions and terms of said International Fire Code, are hereby referred to, adopted and made part hereof as if fully set out in this section, with additions, insertions, deletions and changes as follows:

Section 101.1 Insert "City of Dover, Delaware", in place of [NAME OF JURISDICTION].

Section 103.1, Creation of agency. Insert “City of Dover Fire Marshal’s Office” and “fire code official.”

Sections 105.5 and 105.6, Required operational and construction permits. Delete the published permit lists. Permit requirements expressly established elsewhere in Chapter 46 remain in effect.

(b) National Fire Codes adopted. There is hereby adopted the most recently published edition of the National Fire Prevention Association's (NFPA) National Fire Codes (excluding NFPA Codes 11C, 13E, 402M, -41s, 422, 424M-473, 901-906, 1001-1041, 1201-1410, 1452-1999, 5000).

(c) The more restrictive provisions of the International Fire Codes as set forth in subsection (a) above or the National Fire Codes as set forth in subsection (b) above shall apply whenever they may be in conflict.

(d) It shall be unlawful for any person to violate any of the provisions of the publications adopted in subsection (a) or (b).

FINAL READING – PROPOSED ORDINANCE #2026-14 – DATA CENTER

MORATORIUM

The First Reading of the Proposed Ordinance was accomplished during the Council Meeting of September 28, 2026. Council President Neil reminded members of the public that copies of the proposed ordinances were available at the entrance of the Council Chambers or on the City’s website at www.cityofdover.gov under “Government”.

Ms. Hall reviewed the proposed moratorium on accepting, processing, and approving applications for new large energy-use facilities and data centers. She stated that the only change since the first reading was the addition of a specific data center definition. She explained that the moratorium would provide time to study electrical capacity, infrastructure, utility costs, system reliability, and public welfare and to develop comprehensive standards. She described the limits on permits and other approvals, the treatment of pending applications, and the ordinance’s exemptions.

Mr. Lewis stated that he supported the moratorium but opposed data centers locating in Dover, citing concerns about the environment, residents’ health, and infrastructure.

Ms. Arndt moved that the Final Reading of proposed ordinance #2026-14 be acknowledged by title only, seconded by Mr. Boggerty and unanimously carried (Sudler absent).

Página 44

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 41

By motion of Ms. Hall, seconded by Mr. Anderson and carried by a unanimous roll call vote (Sudler absent), Ordinance #2026-14 was adopted, as follows:

BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN COUNCIL MET:

SECTION 1. - Purpose: The purpose of this Ordinance is to temporarily suspend the acceptance and approval of applications for new Large Energy Use Facilities while the City develops comprehensive regulations governing their location, construction, infrastructure requirements, utility impacts, and public welfare considerations.

SECTION 2. - Definitions: Large Energy Use Facility Large Energy Use Facility means a facility that does any of the following:

  • 1.Uses or is projected to use a monthly maximum demand of 75 megawatts or greater at a load factor of 85% or greater.
  • 2.Uses a monthly maximum instantaneous demand of 100 megawatts or greater.
  • 3.Is a data center that uses or is able to use a monthly maximum demand of 30 megawatts or greater. For purposes of this provision, a data center means a facility described under code 518210 of the 2022 North American Industry Classification system primarily engaged in providing computing infrastructure, data processing services, web hosting services, servers, artificial intelligence, cloud computing systems, cryptocurrency operations, high-performance computing systems, colocation services or similar digital processing equipment.

SECTION 3. – Moratorium Effective immediately upon adoption: The City shall not: • accept; • process; • review; • approve; • issue permits; • issue site plan approvals; • approve conditional uses; • approve rezonings; • approve subdivision applications; • issue building permits; • execute utility service agreements; • issue certificates of occupancy;

for any new Large Energy Use Facility or Data Center as defined in Section 2.

Página 45

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 42

SECTION 4. - Pending Applications Applications deemed complete before the effective date shall be stayed unless the applicant elects to withdraw.

The City Manager may recommend limited exemptions where necessary to prevent constitutional takings or vested-right claims, subject to Council approval.

SECTION 5. - Exemptions This Ordinance shall not apply to: Government facilities; Hospitals; Universities; Public safety facilities; Existing industrial users expanding by less than 20% electrical demand; Routine maintenance; Existing telecommunications facilities; Clean hydrogen production facilities as defined in Appendix B Article 12 Utility infrastructure owned by public utilities.

SECTION 6. - Comprehensive Study During the moratorium, the City shall prepare recommendations concerning: A. Electrical capacity • transmission • substations • redundancy • contingency planning B. Ratepayer protection including: • cost allocation • power purchase agreements • demand charges • standby power • stranded cost recovery C. Infrastructure • roads • water • sewer • stormwater D. Land Use • zoning districts • setbacks • buffering • height • screening E. Environmental Standards • emissions • generators • battery storage

Página 46

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 43

  • •noise
  • •lighting
  • •Economic Impact including:
  • •permanent jobs
  • •construction jobs
  • •tax revenue
  • •opportunity costs
  • •competing industrial uses
  • •Technology Review including:
  • •AI computing
  • •liquid cooling
  • •microgrids
  • •on-site generation
  • •renewable integration

SECTION 7. - Future Ordinance Prior to expiration of this moratorium, the City shall consider adoption of permanent regulations addressing: • zoning • utility requirements • electrical capacity reservation • minimum employment standards • water usage • environmental standards • decommissioning • financial security • community benefit agreements • public reporting requirements.

SECTION 8. - Duration This moratorium shall remain in effect for eighteen (18) months from the effective date unless sooner repealed by Council.

The Council may extend the moratorium by ordinance upon findings that additional study remains necessary.

SECTION 9. - Emergency Finding The Council specifically finds that immediate enactment is necessary because: • multiple inquiries regarding Large Energy Use Facilities; electrical infrastructure planning could be materially affected before permanent regulations are adopted; • delay could impair the City's ability to protect existing customers and future economic development opportunities; • immediate action is therefore required to preserve the public health, safety, and welfare

CITY MANAGER'S ANNOUNCEMENTS

Ms. Duca announced that the main water replacement work on Queen Street and the Fairview Alleys was nearing completion, with street restoration expected in late October. Water system

Página 47

Item #1.
CITY COUNCIL MEETING OF OCTOBER 12, 2026 PAGE 44

flushing was proceeding on schedule, with maps posted on the City’s website and Facebook page. She reported that crane setup for Dover Mobility Center precast concrete deliveries was scheduled for October 14th, with deliveries beginning October 15th and continuing through November, weekdays from 7:00 a.m. to 3:00 p.m. She described the delivery route through Division, Bradford, and Loockerman Streets. Staff were seeking solutions to repair the Silver Lake Dam sluice gate, which had delayed the lake drawdown, and had notified affected residents. She announced an October 14th housing-planning workshop at the Dover Public Library from 4:30 p.m. to 6:30 p.m. and reminded residents that leaf collection would begin October 19, 2026.

MAYOR'S ANNOUNCEMENTS

Mayor Christiansen announced a Veterans Day parade planned for November 7, 2026 and encouraged residents to watch for further information.

COUNCIL MEMBERS' ANNOUNCEMENTS

Mr. Anderson thanked Fourth District residents for attending the pizza and conversation event with Dr. Sudler and thanked City staff for responding to concerns. He announced that winter shelter, legal requirements, and possible accommodations would be discussed on October 27, 2026. Council President Neil noted that construction of the new parking garage would disrupt downtown traffic and that information from the Downtown Dover Partnership would be posted on the City’s website.

The meeting adjourned at 8:03 p.m.

ANDRIA L. BENNETT, CMC CITY CLERK

All ordinances, resolutions, motions, and orders adopted by City Council during their Regular Meeting of October 12, 2026, are hereby approved.

ROBIN R. CHRISTIANSEN MAYOR

Página 48

EXHIBIT #1

Regular Council Meeting of Item
10/12/2026
#1.

Página 49

Item #1.

Página 50

Item #1.

Página 51

Item #1.

Página 52

Item #1.

Página 53

EXHIBIT #2

Regular Council Meeting of 10/12/2026
Item #1.

Página 54

Item #1.

Página 55

Item #2.

COUNCIL COMMITTEE OF THE WHOLE

The Council Committee of the Whole met on October 13, 2026, at 6:00 p.m. with Council President Neil presiding. Council members present were Mr. Anderson, Ms. Arndt, Mr. Boggerty, Ms. Hall (joined at 6:13 p.m.), Mr. Lewis (via WebEx) (out at 8:05 p.m.), Dr. Pillsbury, and Mr. Rocha. Dr. Sudler was absent. Mayor Christiansen was also present. Civilian members present for their Committee meetings were Mr. Garfinkel (via WebEx), Mr. Shevock (via WebEx) (Legislative, Finance, and Administration), and Mr. Lewis (Parks, Recreation, and Community Enhancement).

ADOPTION OF AGENDA

Mr. Boggerty moved for adoption of the agenda, seconded by Dr. Pillsbury and unanimously carried.

Council Reports – September 2026

First District Dr. Pillsbury reported handling several complaints and concerns from constituents during the past month.

Mr. Rocha reported attending the Family Court ribbon-cutting ceremony, two Construction and Property Maintenance Code Board of Appeals meetings, the DEMEC dinner, a meeting with the Downtown Dover Partnership and Jason Lyon, Assistant City Manager, regarding the EPA Riverwalk assessment, and a Village of Westover Town Hall meeting at the library. He also addressed constituent complaints.

Second District Mr. Lewis reported that he attended Delaware State University’s event on Saturday, during which he participated in the parade. He also attended the grand opening of the Delaware State News at its new location in the Duncan Center, as well as various other community events throughout the past month. Additionally, he addressed constituent complaints on Elm Terrace, Orchard Avenue, and in the Stoney Creek development. He stated that he worked with staff to address and resolve those concerns.

Ms. Hall was absent; no report was given.

Third District Ms. Arndt reported speaking with several constituents with a range of concerns about trash in their neighborhood and along the Route 13 corridor, tree trimming, and how the city maintains trees, especially under power lines. She noted attending meetings for the Silver Lake Commission and providing assistance to the Downtown Dover Partnership. Lastly, she reported speaking to constituents regarding downtown development and concerns about downtown.

Página 56

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 2 Item #2.

Fourth District Mr. Anderson reported discussing efforts involving downtown properties and ongoing work on issues affecting the downtown area. He thanked staff for addressing so many of the concerns facing the different areas downtown.

Dr. Sudler was absent; no report was given.

At-Large Mr. Boggerty reported attending the Village of Westover Town Hall meeting and meeting a constituent who is considering opening a business downtown to contribute to continued downtown growth. He noted working with a constituent regarding a property that had been boarded up following the death of a family member, and Code Enforcement assisted. Lastly, he reported attending the Construction and Property Maintenance Code Board of Appeals meetings as the chairman.

Council President Neil Council President Neil reported attending the October 8, 2026, Code Board of Appeals meeting with Chairman Sudler. He discussed filling a vacant Third District seat on the Dover Human Relations Commission with Ms. Chiara Fox. He reported three East Lake constituent complaints involving a storm drain, a truck and shopping cart, and grass clippings entering drains, which Chief Code Enforcement Officer Eddie Kopp addressed. He also received a request to restrict non-local traffic on Acorn Lane while East Loockerman Street was blocked. Assistant City Manager Jason Lyon advised that Acorn Lane is under DelDOT’s jurisdiction. Mr. Neil discussed a complaint about debris at a house under construction at William and Water Streets, on which Mr. Kopp had taken action, and a neighborhood complaint involving White Oake Road and April Drive.

Due to the absence of Chairwoman Hall, the Legislative, Finance, and Administration Committee proceeded before the Parks, Recreation, and Community Enhancement Committee.

LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE

The Legislative, Finance, and Administration Committee met with Chairman Anderson presiding.

Adoption of Agenda Mr. Boggerty moved for adoption of the agenda, seconded by Mr. Rocha and unanimously carried.

Proposed Ordinance #2026-15 – Amending Chapter 42 – Environment – By Adding Sec. 42- 3 – Lighting (Eddie Kopp, Chief Code Enforcement Officer) Mr. Eddie Kopp, Chief Code Enforcement Officer, presented Proposed Ordinance #2026-15 concerning lighting in residential zones. He explained that the city had received an increasing number of complaints about light pollution, including spotlights installed on houses and directed into neighboring windows as a means of harassment. Existing zoning language addressed commercial properties but did not provide enforceable language for the residential complaints. The

Página 57

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 3 Item #2.

proposed ordinance would provide that authority, and its fee structure was consistent with the other applicable ordinances.

Staff recommended forwarding Proposed Ordinance #2026-15 to Council for approval.

Mr. Rocha stated that he had received a complaint about a neighbor’s light shining onto another property. He acknowledged that residents wanted to illuminate their backyards but stated that lighting should not interfere with another resident’s property or shine into a bedroom window.

Mr. Kopp confirmed that such complaints were common and that the existing code lacked enforceable language to address them.

Ms. Arndt questioned how unusually bright lighting would be defined and noted that the proposal did not specify lumens or other measurable criteria.

Responding to Ms. Arndt, Mr. Kopp stated that criteria could be added.

Ms. Arndt requested that staff review residential lighting ordinances adopted by other municipalities and consider including criteria to guide enforcement.

Responding to Mr. Lewis, Mr. Kopp explained that the proposal concerned lights installed on residential property, such as a spotlight mounted on a house and directed toward a neighboring property. Passing vehicle headlights would be incidental and would not fall under the ordinance. He stated that residents could direct security lighting away from neighboring windows while still protecting their properties. The intent was to prevent nuisance lighting, particularly lights deliberately directed into windows, and he was willing to consider revisions to clarify the language. Mr. Kopp further explained that the installation requirement would exclude a handheld flashlight and that the language had been adapted from another jurisdiction’s ordinance.

Mr. Rocha agreed that lumen criteria could be considered but questioned how staff would determine lumens without entering the property to inspect the fixture. He suggested that the complaint-based language might allow staff to address the brightness or direction of a light through the complaint process.

Mr. Kopp stated that he also used camera-mounted spotlights. He explained that directing a camera toward another person’s window raised a separate police concern and that a camera’s light should not be directed into that window. Some reflected light was inevitable, but the concern was light that interfered with the neighbor’s use of the property. He stated that cameras themselves should remain outside the scope of the proposed lighting ordinance.

Mayor Christiansen requested a point of personal privilege and stated that changing the advertised order of committee meetings required a Council motion to amend the agenda. He requested that Council formally approve the change or return to the original order.

Chairman Anderson returned the floor to Council President Neil for that purpose.

Página 58

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 4 Item #2.

Mr. Anderson moved to hold the Parks, Recreation, and Community Enhancement meeting after the Legislative, Finance, and Administration meeting. The motion was seconded by Ms. Hall and unanimously carried.

Council President Neil explained that the order had been changed because Chairwoman Hall had not been present to preside.

Mr. Boggerty discussed the reasonable person standard and questioned whether a numerical lumen limit would create a standard that residents and staff could readily measure. He described a light at his own home that he had discovered shone into a neighbor’s house through trees. Until he could adjust it, he had limited its use and communicated with the neighbor when he needed to use it. He distinguished ordinary passing headlights and security lighting from lighting that interfered with another residence.

Responding to Mr. Shevock, Mr. Kopp stated that the proposed ordinance would not apply to commercial properties, which were already subject to lighting provisions in the zoning ordinance. He offered to review the existing enforceable language and determine how the concern could be addressed. He reiterated that the proposed ordinance specifically addressed lighting between residential properties. Mr. Kopp described a prior complaint involving a sports field where fixtures had been converted to LED lighting without being repositioned. After staff explained the effect on neighboring homes, the lights had been redirected within a few days. He stated that staff intended to use conversations, notices, and education to resolve residential lighting complaints in a similar manner.

Ms. Arndt moved to recommend forwarding Proposed Ordinance #2026-15 to Council for approval, as recommended by staff. The motion was seconded by Dr. Pillsbury and unanimously carried.

Budget Amendment Discussion (Sharon Duca, City Manager) Ms. Sharon Duca, City Manager, discussed a potential budget amendment involving the Economic and Community Development Fund and entrance improvements at the Garrison Oak Technical Park. She explained that the Fiscal Year 2027 budget had authorized a $1.426 million transfer to the General Fund for the entrance improvements. The budget had reflected a prior-year fund balance of slightly more than $3 million and a remaining balance of approximately $1.672 million after the transfer. The year-to-date budget confirmed that the transfer had been completed.

Ms. Duca reported that staff had submitted an application for TIF funding in May 2026 using a revised project estimate of more than $2 million based on design changes. Staff received a funding decision on August 26 and an approval letter on September 26. The project remained in the design phase; DelDOT comments had been received, and staff had requested a meeting with DelDOT. Staff did not yet know whether the funding award would cover the final cost of the improvements. Staff hoped to advertise the project for bids within 45 days, depending on the outcome of the DelDOT meeting.

Ms. Duca explained that the funding award had prompted discussion of a budget amendment to return the $1.426 million to the Economic and Community Development Fund. Staff

Página 59

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 5 Item #2.

recommended limiting the return of funds until bids were received and final costs were known, with a buffer for potential change orders. She noted that the original $90,000 for design had also come from the fund. An additional engineering change order of approximately $45,000 was anticipated to address DelDOT’s concerns and revise the plans. If required, that change order would be submitted to Council because it exceeded her approval authority under city policy.

Chairman Anderson thanked Ms. Duca for the update and stated that further consideration of the transfer would be held pending additional project information. He had been interested in restoring the fund to approximately $2 million to address identified needs and exploring whether some funds could support a rebate or credit to customers following rate increases. He noted that those possibilities would need to be balanced against other priorities.

This item was informational; committee action was not required.

Alderman’s Court Ad Hoc Committee Update (Councilman Anderson) Councilman Anderson provided an update on the Alderman’s Court Ad Hoc Committee and referred members to the committee minutes included in the packet. He reported that the committee had received substantial participation from State representatives, community members, and individuals with court and academic experience. The Newark court clerk had provided information about that municipality’s operations, and Mr. Garfinkel had contributed his experience as a State magistrate. Judge Witham, a retired Superior Court judge, and Dr. Hoff also provided expertise.

Councilman Anderson stated that an alderman’s court was feasible because six Delaware municipalities already operated such courts and Dover had previously operated one, although that had ended approximately 70 years earlier. The committee was examining how a court could operate fairly and sustain itself financially. He emphasized that the purpose was to give Dover greater control over enforcement of lower-level offenses while allowing the Department of Justice to concentrate on higher-level offenses, rather than to create a revenue-generating mechanism.

Councilman Anderson described ten committee goals: improving quality of life for residents and offenders; distinguishing matters handled by the Alderman’s Court from those handled by the State courts; establishing exclusive and joint jurisdiction; developing cost and revenue estimates and evaluating financial sustainability; maintaining a community focus rather than relying solely on fines; permitting referrals to drug, veterans, and other specialty courts; retaining a criminal focus without affecting property through the court’s jurisdiction; developing sentencing guidelines with constructive community service; exploring an entry point for mental health assistance; and considering probation before judgment to support workforce skills and assessment of individual needs.

William G. Faust, Jr., Dover, questioned the accessibility of afternoon committee meetings for working residents. He referred to a reported startup estimate of approximately $500,000 and asked where funding would come from for a judge, personnel, facilities, security, and holding cells. He expressed concern that fines would place additional burdens on residents and stated that existing courts should address the offenses. He urged Council to focus on the budget, revenue, and serious public safety concerns, including gun violence, prostitution, and drugs.

Página 60

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 6 Item #2.

Chairman Anderson responded that, in his view, the current Department of Justice policies and existing court process had not adequately addressed prostitution and drug-related concerns. He stated that an Alderman’s Court could provide the referrals needed to address those issues.

Belinda Main, Dover, opposed creating a new court before addressing access to assistance for homelessness and addiction. She questioned whether another court or committee would resolve the problems and urged Council to act on constituent concerns.

Council President Neil responded that Council had been asked by residents and business owners to help individuals whose addiction or mental illness contributed to homelessness and disrupted businesses and neighborhoods. He stated that Council members lacked authority to require treatment and that a legal process was needed to require individuals to obtain help and remain in treatment long enough to address addiction or mental illness and enter training programs. He emphasized that the goal was assistance rather than collecting money from those individuals.

Bonnie Pennington, Dover, urged participants to work together and consider existing vacant buildings, including the former Family Court, before spending money on new facilities. She also stated that she could not attend a 3:00 p.m. meeting because of work and expressed concern about the City’s financial condition. She supported efforts to address homelessness, addiction, and pedestrian safety and encouraged cooperation rather than conflict.

Responding to Ms. Arndt, Mr. Anderson stated that the timing depended on establishing that the court could sustain itself and obtain jurisdiction sufficient to meet the committee’s goals. He stated that facility arrangements and other implementation choices could take additional time, and that the court might begin in an existing location and move later. Mr. Anderson clarified that it would likely take three months or longer for a recommendation and at least two years to implement the recommended changes, especially to the Charter.

Reginald Daniel, Townsend, emphasized gaps in substance use and mental health services. He described a homeless resident who was deaf and had difficulty accessing assistance, as well as literacy barriers and the difficulty of finding treatment for individuals who needed wound care. He urged the City to focus on filling gaps in existing services and addressing the underlying conditions contributing to homelessness and addiction. He questioned whether fines or a court with limited capacity would resolve those problems and favored strengthening coordinated resources for long- term improvement.

This item was informational; committee action was not required.

Mr. Anderson moved for adjournment of the Legislative, Finance, and Administration Committee meeting, hearing no objection the meeting adjourned at 7:21 p.m.

PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE

The Parks, Recreation, and Community Enhancement Committee met with Chairwoman Hall presiding.

Página 61

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 7 Item #2.

Adoption of Agenda Mr. Boggerty moved for adoption of the agenda, seconded by Dr. Pillsbury and unanimously carried.

Mr. Rocha recused himself from the meeting at 7:23 p.m.

Council President Neil stated that he had reviewed the packet and prior meeting minutes and intended to support staff’s recommendation based on the documented federal requirements, City ordinances, and timelines. He emphasized the need to replace lost shelter spaces and supported exploring the former Morris correctional facility. He also noted that the former Family Court was State property and that the subject would be discussed further on October 27.

Mayor Christiansen reported that he and two State legislators had been working with the State on options to address the loss of winter housing and expected to have information to present.

Mr. Boggerty moved to accept staff’s recommendation to withdraw the previously approved $40,000 CDBG allocation for the People’s Community Center Renovation Project and direct staff to make the funds available through the 2027 Annual Action Plan process. The motion was seconded by Dr. Pillsbury.

Mr. Anderson urged members to hear the additional information from the People’s Community Center before acting.

Ms. Arndt requested an opportunity for additional comments.

Mr. Boggerty withdrew his motion, and Dr. Pillsbury withdrew her second.

Consideration of Withdrawal and Reallocation of CDBG Funds for People’s Community Center Renovation Project (Debbie O’Brien, Community Development Manager) Ms. Debbie O’Brien, Community Development Manager, presented a recommendation concerning the previously approved $40,000 CDBG allocation for the People’s Community Center Renovation Project.

Staff recommended approval of the withdrawal of the previously approved $40,000 CDBG allocation for the People’s Community Center Renovation Project and to direct staff to make the funds available through the 2027 Annual Action Plan Process.

Ms. O’Brien, Community Development Manager, corrected her response to a question Dr. Sudler raised at the previous meeting, clarifying that the People’s Community Center had complied with the requirement to obtain a Phase I Environmental Site Assessment.

Ms. O’Brien explained that her recommendation was strictly limited to whether the city should continue the environmental review process and proceed with releasing the $40,000 allocation for the workforce development renovations project.

Página 62

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 8 Item #2.

Ms. O’Brien stated that, since her presentation on September 29, 2026, she had identified two additional concerns. The first involved MFI Construction Services, the contractor identified in the reimbursement request. She explained that an internet search indicated the business was not licensed with the State or the City, was not registered as a contractor, and had a disconnected telephone number.

The second concern involved the People's Community Center's public statement that it did not intend to pursue the conditional use approval necessary to continue operating the overnight shelter. As a result, the shelter was not expected to operate during the upcoming winter. Ms. O’Brien noted that the city had already made a substantial federal investment in renovations and shelter-related improvements at the church through American Rescue Plan Act (ARPA) funding. Those improvements were associated with the intended use of the facility to provide shelter and services to individuals experiencing homelessness. Given the organization's decision not to pursue the required approval, she questioned whether a similar situation could occur with the proposed $40,000 allocation.

Ms. O’Brien emphasized that her concerns extended beyond a single missing document, procurement mistake, or administrative error. She stated that the city had made repeated efforts to identify a path forward through communications regarding spending requirements, requests for additional documentation, opportunities to submit corrected information, and efforts to identify eligible expenses and ways to continue supporting the proposed activities.

Ms. O’Brien acknowledged that previous discrepancies and deficiencies could not be undone; however, the outstanding concerns warranted pausing the process and considering all available information before proceeding. She reaffirmed her recommendation regarding the funding.

Ms. Sue Harris, Coordinator of the People’s Community Center, expressed her support for the proposed use of the Morris Correctional facility as an overnight shelter and commended Senator Buckson's efforts. She explained that operating the overnight shelter was only one component of the services provided by the People’s Community Center and placed considerable demands on the organization during its four months of operation. She stated that the Center served up to 100 individuals daily through meals, a free store, counseling, assistance with detoxification services, showers, clothing, toiletries, and other resources. Ms. Harris emphasized that the organization would welcome an alternative location for the overnight shelter and was willing to assist in establishing the new facility.

Ms. Harris stated that, although the organization hoped to recover its expenditures, her primary concern was addressing questions regarding the Center’s financial responsibility and reputation. She expressed appreciation for the city’s collaboration with the organization and other churches over the past decade, particularly through federal American Rescue Plan Act (ARPA) and Community Development Block Grant (CDBG) funding. She clarified that these funds were federal pass-through funds rather than funds from the city’s general budget. Ms. Harris acknowledged Ms. O’Brien’s efforts in reviewing the organization’s agreements and expenditures but expressed concern regarding political pressure and what she believed were factual inaccuracies in the previous presentation. She maintained that the organization had generally complied with applicable requirements, with two exceptions. The first involved the failure to

Página 63

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 9 Item #2.

submit a required final report within the established timeframe. She stated that the completed report had been provided to Ms. O’Brien that evening and attributed the delay, in part, to the organization not receiving the necessary reporting forms until approximately two weeks earlier. The second involved following federal procurement requirements rather than the city’s procurement requirements. She explained that, in the absence of clear instructions, the organization had relied on federal guidelines and did not become aware of the discrepancy until after the procurement process had been completed.

Ms. Harris noted that the city’s reimbursement procedures required expenditures and supporting documentation to be reviewed for compliance before payments were issued. She maintained that this process ensured that previously reimbursed expenses had been reviewed and approved by city staff.

Ms. Harris outlined renovations and improvements completed or underway at the facility, including architectural and engineering plans for the four-story building, installation of approximately 6,000 square feet of flooring, painting of basement walls, renovation of a permitted commercial kitchen with commercial-grade equipment, construction of three additional bathrooms and three shower rooms, installation of laundry facilities, renovation of storage and work areas, installation of a fire suppression and sprinkler system, exterior lighting, security cameras, and electronic security improvements. She also reported that demolition of a 125-year-old bowling alley had been completed to accommodate future workforce development and readiness offices, although construction of that space remained unfinished.

Ms. Harris provided the following project expenditures and funding information:

  • •Architectural and engineering plans totaling approximately $150,000.
  • •Commercial kitchen renovations totaling $94,232, funded through the initial ARPA allocation.
  • •Fire suppression and sprinkler improvements totaling approximately $125,000, of which $59,714 was funded through ARPA.
  • •Workforce development renovations estimated at $200,000, with the $40,000 CDBG allocation currently on hold.
  • •Building-wide HVAC replacement covering all four floors, totaling approximately $1.1 million, with completion anticipated by December 2026.

Ms. Harris stated that the initial ARPA-funded projects, including the commercial kitchen and sprinkler system, had been completed. She further reported that a second ARPA allocation of $63,288 for salaries, maintenance, and utilities had been fully reimbursed and that an August 7 monitoring review found the expenditures to be in compliance. She stated that the city subsequently approached the organization in 2025 regarding approximately $63,000 in previously allocated ARPA funding that another organization had been unable to expend. The Center accepted the funds for eligible expenses, including salaries, operating costs, and bunk beds, and

Página 64

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 10 Item #2.

approximately $17,000 remained available for reimbursement before the deadline of December 31, 2026.

Ms. Harris reported that the organization had received approximately $277,941 in ARPA funding and $62,700 in CDBG funding, including the disputed $40,000 renovation allocation and a pending $22,000 operations allocation. She estimated that the overall improvement projects totaled approximately $1.5 million, with approximately $340,000 provided through federal funding and the remaining expenses primarily covered by the church congregation. She disputed suggestions that the organization had failed to provide its required financial contribution.

Regarding the FY2025 CDBG renovation award, Ms. Harris explained that former Community Development Manager Tracey Harvey had advised the organization to follow federal procurement requirements, which Ms. Harris understood to require three bids for projects exceeding $50,000. Because the award was $40,000, the organization believed three bids were not required. Nevertheless, she stated that three contractors had been consulted, with two declining to submit bids after reviewing the architectural plans prepared by Becker Morgan. Following a recommendation from the Downtown Dover Partnership’s development director, the organization selected MFI Construction Services and entered into a contract, making two initial payments totaling approximately $53,000.

Ms. Harris stated that the contract and proof of payment were submitted to Ms. O’Brien in spring 2026 with a reimbursement request. When asked to explain the absence of three bids and the selection of MFI Construction Services, the organization provided a written explanation, which Ms. O’Brien acknowledged receiving.

Ms. Harris further explained that, during a fall 2025 site visit, Ms. Harvey advised the organization of federal environmental compliance requirements, including lead-based paint testing, potential abatement, and a Phase I Environmental Site Assessment. She stated that the organization understood these expenses would be eligible under the $40,000 CDBG allocation. The environmental work was completed in November and December 2025, and supporting documentation and reimbursement requests were submitted to the city.

Ms. Harris maintained that the city was obligated to reimburse approximately $17,100 for environmental-related expenditures and $22,900 toward the demolition expenses, totaling the $40,000 award.

Ms. Harris also addressed the matching-fund requirement, stating that the church congregation had financed substantial improvements, including the $1.1 million HVAC project, exceeding the required $153,978 contribution. She referenced the 2022 subrecipient agreement between the City of Dover and People’s Church of Dover, which established a performance period from April 27, 2022, through December 31, 2026. She emphasized that the agreement was with the church rather than the People’s Community Center.

Drawing on her professional experience managing federal, state, and local grants, Ms. Harris stated that grant applications typically include detailed procurement, reporting, and record-retention requirements. She expressed concern that the city’s grant application materials did not clearly

Página 65

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 11 Item #2.

identify the city’s $10,000 procurement threshold. She reiterated that the organization had relied on federal guidelines in the absence of written instructions and noted that it had previously obtained three bids for a project in 2022.

Ms. Harris explained that project timelines and budgets frequently required adjustments due to funding availability, contractor shortages, rising construction costs, environmental requirements, and other unforeseen circumstances. She stated that these challenges had been particularly significant following the COVID-19 pandemic. Although funding sources and project schedules had changed, she maintained that the organization’s overall objectives of providing services to individuals experiencing homelessness had remained consistent.

Ms. Harris expressed concern that complaints and allegations regarding the organization had negatively affected its ability to secure additional funding. She stated that some funding sources had become hesitant to support the Center because of uncertainty surrounding its continued operations. She specifically referenced the loss of anticipated homeless services funding, while noting that funding for the organization’s children’s programs had continued. She explained that the organization had anticipated receiving the homeless services funding until approximately mid- June and had identified it as a pending funding source in other grant applications.

Ms. Harris disputed concerns regarding compliance with CDBG national objectives and maintained that both the operations and renovation projects satisfied the applicable federal requirements, referencing 24 CFR §§ 570.201 and 570.208.

In closing, Ms. Harris reiterated that the 2022 agreement was entered into with People’s Church of Dover, a separate entity from the People’s Community Center. She stated that the city had previously issued correspondence confirming fulfillment of the church’s contractual obligations and that the church had invested substantially more in renovations than required under its agreement. She maintained that concerns regarding the earlier agreement should not be used as justification for withholding funding under the People’s Community Center’s 2025 agreement.

Ms. Arndt stated that there appeared to be misunderstandings on both sides and emphasized the importance of learning from past mistakes and maintaining open lines of communication. She clarified that her decision in March to vote against the $36,000 workforce development program grant application was based solely on the merits of the application and not on the performance or concerns associated with the overnight shelter. She explained that the application had not adequately demonstrated the program’s long-term sustainability or identified sufficient funding sources beyond the city. She expressed reservations about providing initial funding for a program without a clear plan for continued financial support, noting that she was generally more comfortable supporting capital improvements where expenditures and completed work could be documented.

Ms. Arndt emphasized that she had never advocated for the closure of the overnight shelter and recognized the importance of the services it provided. However, she believed the shelter should operate in a manner that was compatible with the surrounding neighborhood and addressed residents’ concerns. She expressed surprise at Ms. Harris’s statement that the organization did not wish to continue operating the overnight shelter and would not pursue the conditional use approval

Página 66

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 12 Item #2.

necessary to continue those operations. She noted that the city had received significant public criticism the previous evening regarding the potential closure of the shelter. She questioned that criticism in light of the organization's apparent decision not to pursue the available conditional use approval process, which could have allowed the shelter to continue operating.

Responding to Ms. Arndt, Ms. Harris explained that the People’s Community Center had gradually assumed responsibility for operating the emergency overnight shelter during the COVID-19 pandemic after other participating churches discontinued their involvement. She stated that the organization had continued providing shelter services for several years, often without dedicated funding, despite overnight shelter operations being the most demanding aspect of its services. She emphasized that the Center preferred to focus on programs that helped individuals experiencing homelessness achieve stability and independence rather than continuing to provide emergency shelter indefinitely.

Ms. Harris expressed her belief that the community needed transitional and affordable housing rather than additional emergency shelters. However, she acknowledged that emergency shelter capacity in Dover remained inadequate. She explained that the organization had actively sought alternative shelter locations and partners, including discussions with the Salvation Army and representatives associated with the proposed correctional facility. She expressed strong support for using the correctional facility, noting that its existing rooms, kitchens, and showers could accommodate shelter operations.

Regarding the conditional use approval, Ms. Harris explained that the organization did not wish to pursue the process because it had historically operated as an emergency shelter under Code Purple provisions and believed the additional approval would require considerable city staff time, expense, and public hearings without guaranteeing approval. She further expressed concern that obtaining permanent approval could create expectations that the organization operates a year- round shelter, which was not its intention.

Ms. Harris stated that the facility was equipped to accommodate approximately 30 individuals but frequently served between 50 and 60, with attendance occasionally reaching 80. She emphasized that the organization would prefer another provider assume responsibility for overnight shelter operations but would continue providing emergency shelter if no alternative became available, as it did not want individuals left outside in freezing conditions.

Ms. Harris also addressed concerns regarding neighborhood impacts, stating that the organization had made efforts to address complaints and encourage appropriate behavior among those receiving services. These efforts included identifying individuals responsible for discarded food containers and prohibiting individuals observed engaging in drug-related activities from returning. She acknowledged the difficulties associated with managing individuals experiencing homelessness, substance abuse, and other challenges but emphasized the importance of continuing to provide assistance.

In response to Ms. Arndt’s concerns regarding the sustainability of the workforce development program, Ms. Harris stated that the organization had secured or anticipated several additional funding sources, including approximately $350,000 in opioid-related funding, which remained

Página 67

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 13 Item #2.

pending, and approximately $100,000 in other funding awarded earlier in the year. She also referenced contributions from additional organizations and expressed confidence in the program’s financial sustainability.

Ms. Harris explained that Harold Stafford, former Delaware Secretary of Labor and former Polytech School Board member, would oversee the workforce development program. She stated that the program would initially focus on workforce readiness, including assisting participants with obtaining identification and necessary documentation, addressing substance abuse and mental health needs, and establishing the stability required before beginning employment training and development. She emphasized that these supportive and navigation services were essential components of the proposed program.

Ms. Harris concluded by reiterating her confidence in the organization’s financial management and expressing hope that additional funding opportunities would become available once concerns surrounding the organization were resolved. She acknowledged that her extensive professional experience in grant administration and financial management could be better utilized by the organization and stated that she intended to assume greater responsibility for overseeing and managing its grants moving forward.

Ms. Arndt reiterated that there had been misunderstandings and misinformation on both sides and emphasized the importance of correcting those misconceptions and working collaboratively moving forward. She expressed her inclination to allow the funding to proceed, acknowledging that some constituents might disagree with her position. However, she noted that the work had already been completed and believed consideration should be given to allowing the reimbursement. Ms. Arndt further emphasized that, should the organization apply for and receive city funding in the future, it would be expected to fully understand and comply with all applicable grant requirements, ensuring that all documentation and procedures were properly completed.

Mayor Christiansen asked Ms. O’Brien whether she had followed the procedures and instructions provided during her training regarding the reimbursement of grant funds.

Responding to Mayor Christiansen, Ms. O’Brien confirmed that she had.

Mayor Christiansen further asked whether he or any member of Council had influenced her presentation or decision to bring the matter before Council.

Responding to Mayor Christiansen, Ms. O’Brien stated that neither the Mayor nor any member of Council had influenced her decision.

Mr. Anderson stated that he supported Ms. O’Brien’s decision to withhold the funds until she received the necessary information. He explained that the matter had since progressed to the decision of whether to reprogram the funding, which he did not support. Mr. Anderson described the People’s Community Center as an organization that had made significant contributions to the city.

Página 68

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 14 Item #2.

Mr. Anderson asked Ms. Harris whether, to the best of her knowledge, the People’s Community Center was currently in compliance with city regulations.

Ms. Harris responded affirmatively.

Mr. Anderson further asked whether the expenditures and requirements that had been satisfied were compliant with federal regulations and eligible for reimbursement under federal guidelines, despite the organization’s inadvertent failure to comply with the City’s purchasing requirements.

Responding to Mr. Anderson, Ms. Harris responded affirmatively, confirming that, to the best of her knowledge, the expenditures complied with federal requirements and were eligible for reimbursement under federal guidelines.

Responding to Ms. Hall, Ms. Harris stated that she believed MFI was a credible company because the company had been recommended by the Downtown Dover Partnership. She explained that she made a note to follow up.

Ms. Hall requested that Ms. Harris report her findings back to Council.

William G. Faust, Jr. stated that the Morris Correctional Center had been closed by the Department of Correction due to funding constraints and expressed concern regarding the building’s maintenance and condition, which he believed could affect its suitability for use as a homeless shelter. He expressed support for the People’s Church and its efforts to assist vulnerable individuals. However, he cautioned Council against making exceptions to established funding requirements, noting that doing so could create a precedent for other organizations seeking similar consideration in the future. He emphasized that the funding involved public money and that appropriate oversight, accountability, and checks and balances were necessary to ensure its proper use.

LaChelle Paul, Dover, questioned how much funding the city had invested in the People’s Church for its emergency shelter operations. She expressed concern that previously invested funds could be wasted if the shelter was unable to continue operating, particularly given the ongoing need for emergency shelter services and the approaching winter months. She acknowledged the importance of accountability and proper oversight of public funds but emphasized the need to be responsible stewards of money already invested, whether through City, State, or federal funding. She questioned whether it would be reasonable to jeopardize those investments over administrative or procedural issues that could potentially be corrected. She suggested that some of the issues may have resulted from miscommunication or uncertainty regarding responsibilities among those involved in administering the grants. She encouraged the city to consider resolving those concerns rather than allowing previous investments and the services provided to the unhoused population to be negatively affected.

Responding to Ms. Paul, Ms. O’Brien stated that the city had invested $283,338 in overnight shelter operations. She clarified that the funding currently under consideration was for renovations associated with the workforce development program, not the overnight homeless shelter.

Página 69

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 15 Item #2.

Ms. Paul asked whether the funding previously invested in the People’s Church was necessary for the facility to comply with applicable requirements for operating the emergency shelter.

Ms. O’Brien explained that she could only address the funding agreement between the city and the People’s Community Center and could not speak to the facility’s zoning or operational requirements.

Ms. Harris clarified that the $40,000 allocation under consideration was specifically designated for renovations to convert the former bowling alley into a workforce development and readiness center and was unrelated to the overnight shelter. She explained that previous ARPA and CDBG funding had supported both capital improvements and operational expenses, including supplies and services already provided. She noted that an additional $22,700 in FY2025 CDBG operational funding remained pending.

Ms. Paul asked whether the workforce development program and other services were intended to support the same population, including individuals experiencing homelessness and substance abuse challenges.

Ms. Harris confirmed that the organization’s programs served low-income, extremely low-income, and homeless individuals. She explained that the overnight emergency shelter was only one component of the organization’s broader services, which continued throughout the year. She further clarified that funding for emergency shelter operations, year-round services, and capital improvements was generally obtained through separate grant applications.

Ms. Paul questioned whether the overnight emergency shelter would reopen during the upcoming winter.

Ms. Harris explained that the organization would consider continuing shelter operations if no alternative location became available and the city agreed to allow the organization to operate under the arrangement that had been in place for approximately ten years.

Ms. Paul expressed concern regarding the approaching winter and asked whether the city had a concrete plan to ensure emergency shelter would be available for individuals experiencing homelessness. She specifically questioned whether the city would permit the People’s Community Center to resume emergency shelter operations if no other facility became available.

Ms. Harris stated that the organization was prepared to assist but emphasized that it would not jeopardize its business license, certificate of occupancy, or other year-round programs by operating without the necessary agreement or authorization. She reiterated the organization’s willingness to assist in establishing an alternative shelter location and expressed hope that the City would continue pursuing those options. However, if no alternative became available, she hoped the city would consider an agreement allowing the organization to continue providing emergency shelter services as it had in previous years.

Bonnie Pennington, Dover, expressed concern regarding the potential closure of the People’s Church emergency overnight shelter and the lack of alternative accommodations during the winter

Página 70

COUNCIL COMMITTEE OF THE WHOLE MEETING OCTOBER 13, 2026 PAGE 16 Item #2.

months. She shared her personal experience with her son, who had previously experienced homelessness, and emphasized the importance of providing safe shelter during freezing temperatures. She urged Council to explore available funding within the city’s budget to allow the church to continue providing emergency shelter services.

Mr. Neil moved to recommend acceptance of the staff recommendation to withdraw the previously approved $40,000 CDBG allocation. The motion was seconded by Mr. Boggerty and failed by a roll call vote of three (3) yes (Boggerty, Neil, Mike Lewis), three (3) no (Hall, Anderson, Arndt), one (1) abstention (Pillsbury) (Sudler, Lewis absent).

Mr. Anderson voted no for the reasons he had previously stated.

Dr. Pillsbury stated that she remained undecided and abstained.

Council President Neil explained that his affirmative vote reflected concerns brought forward by neighboring residents and information in police and emergency medical reports about activity in the surrounding area.

Ms. Hall stated that she was troubled by the questions about the contractor payments and wanted further information, but also believed that the prior investment and the importance of completing the project supported her negative vote.

Following the failed motion, Council President Neil reiterated that the allocation concerned workforce development renovations rather than emergency sheltering. He stated that the city had continued contacting the Center’s trustees and others to explore assistance. He noted Ms. Harris’s willingness to provide emergency shelter under an agreement and stated that such an agreement would need to include the City’s requirements.

Ms. Hall moved for adjournment of the Parks, Recreation, and Community Enhancement Committee meeting, hearing no objection the meeting adjourned at 8:25 p.m.

Mr. Neil moved for adjournment of the Council Committee of the Whole meeting, hearing no objection the meeting adjourned at 8:25 p.m.

Fred A. Neil
Council President

Attachments
Attachment #1 - Information Packet from Sue Harris

Página 71

ATTACHMENT #1

Council Committee of the Whole Meeting of 10/13/2026 Item #2.

Página 72

Item #2.

Página 73

Item #2.

Página 74

Item #2.

Página 75

Item #2.

Página 76

Item #2.

Página 77

Item #2.

Página 78

Item #2.

Página 79

Item #2.

Página 80

Item #2.

Página 81

Item #2.

Página 82

Item #2.

Página 83

Item #2.

Página 84

Item #2.

Página 85

Item #2.

Página 86

Item #2.

Página 87

Item #2.

Página 88

Item #2.

Página 89

Item #2.

Página 90

Item #2.

Página 91

Item #2.

Página 92

Item #2.

Página 93

Item #2.

Página 94

Item #2.

Página 95

Item #2.

Página 96

Item #2.

Página 97

Item #2.

Página 98

Item #2.

Página 99

Item #2.

Página 100

Item #2.

Página 101

Item #2.

Página 102

Item #2.

Página 103

Item #2.

Página 104

CITY OF DOVER Item #13.
FISCAL YEAR JULY 1, 2026 TO JUNE 30, 2027
PRELIMINARY QUARTERLY REVENUE REPORT
As of September 30 2026, FY27

FY27FY27Unaudited25%
ORIGINALREVISEDYTD% BUDGETFY26 Unaudited FY25 Unaudited
GENERAL FUNDBUDGETBUDGETREVENUESRECEIVEDCOMMENTSREVENUESREVENUES
1Property Taxes17,686,30017,686,30017,822,500100.8% Billed at the beginning of FY16,544,10016,306,379
2Payment In Lieu of Taxes500,000500,000570,900114.2% Billed at the beginning of FY538,900578,400
3Transfer from Electric Fund11,000,00011,000,0001,833,30016.7%10,000,00010,000,000
4Intrafund Service Receipts Electric5,104,9005,104,900357,1007.0%4,422,2003,887,700
5Transfer from Transfer Tax Fund2,300,0002,300,000399,70017.4%2,463,6003,212,200
6Business Licenses1,540,0001,540,0001,210,60078.6%1,554,0001,554,900
7Intrafund Service Receipts Water1,393,1001,393,10097,5007.0%1,206,8001,060,900
8Intrafund Service Receipts Wastewater1,003,5001,003,50070,2007.0%869,300764,200
9Sanitation Fees--2,1000.0%6,3001,221,200
10Permits & Other Licenses1,740,0001,740,000100,9005.8%2,500,1002,367,600
11Transfer from Municipal Street Aid Fund750,000750,000-0.0%777,800769,300
12Fines & Police Revenue745,600745,60062,4008.4%1,544,200741,600
13Police Extra Duty Fees550,000550,000159,80029.1%665,000853,700
14Transfer from Police Grant Funds190,000190,000-0.0%50,500383,600
15Police Pension Grant860,000860,000-0.0%925,400861,200
16Court of Chancery Fees4,500,0004,500,000989,00022.0%5,608,6004,644,000
17Transfer from Water/Wastewater Fund2,000,0002,000,000500,00025.0%2,000,0002,000,000
18Transfer from Civil Traffic Penalties Fund200,000200,000-0.0%1,318,30039,100
19Transfer from Sanitation1,000,0001,000,000-0.0%--
20Transfer from Lodging Tax450,000450,000149,60033.2%424,400384,700
21Transfer from Ambulance Service661,500--0.0%631,600559,400
22Transfer from Public Safety589,000589,000-0.0%--
23Library Revenues & County Reciprocal Pymt322,700322,70028,9009.0%295,900302,100
24Franchise Fees450,000450,000-0.0%337,000368,800
25General Fund Grant Receipts1,610,0001,610,0001,696,600105.4% Bond - Public Safety Funds $1.65MM; Dema Grant $.4632,80050,800
26Recreation Revenue142,000142,00037,00026.1%143,400128,200
27Other Miscellaneous Receipts273,500273,5009,3003.4% GSB $2.7m; Misc Rec $1.0m; FA $5.6m310,000546,000
28Interest Income100,000100,00033,20033.2%226,900163,000
TOTALS$ 57,662,100$ 57,000,600$26,130,60045.8%$ 55,397,100$53,748,979
Final Budget57,662,100.0057,000,600.0026,130,600.00$ 55,397,100$53,748,979

10/16/2026 1 of 2

Página 105

CITY OF DOVER Item #13.
FISCAL YEAR JULY 1, 2026 TO JUNE 30, 2027
PRELIMINARY QUARTERLY REVENUE REPORT
As of September 30 2026, FY27

FY27FY27Unaudited25%
ORIGINALREVISEDYTD% BUDGETFY26 Unaudited FY25 Unaudited
WATER FUNDBUDGETBUDGETREVENUESRECEIVEDCOMMENTSREVENUESREVENUES
1Water Fees$7,478,000$7,478,000$1,717,00023.0%$ 7,249,500 $6,624,200
2Water Impact Fees330,000330,00083,30025.2%542,000311,600
3Water Tank Space Leasing484,000484,000-0.0%478,700450,600
4Interest Income15,00015,00019,200128.0%144,300143,200
5Other Miscellaneous Revenues45,20045,20031,30069.2% Penalties $5.0m; GB $20.8m; State Grant $2.9m907,100164,300
TOTALS$8,352,200$8,352,200$1,850,80022.2%$9,321,600$7,693,900
Final Budget$8,352,200$8,352,2001,850,700$9,321,600$7,693,900
FY27FY27Unaudited25%
ORIGINALREVISEDYTD% BUDGETFY26 Unaudited FY25 Unaudited
WASTEWATER FUNDBUDGETBUDGETREVENUESRECEIVEDCOMMENTSREVENUESREVENUES
1Wastewater Fees$5,028,600$5,028,600$1,029,30020.5%4,569,0004,929,200
2Wastewater Adjustment Fees - County Trtmt5,300,0005,300,000960,80018.1%4,258,2004,315,000
3Groundwater Inflow Adjustment2,322,4002,322,400477,30020.6%2,115,1002,326,600
4Wastewater Impact Fees310,200310,20069,70022.5%445,100229,100
5Interest Income150,000150,00018,20012.1%152,700178,400
6Other Miscellaneous Revenues20,00020,00020,200101.0% Penalties $8.8m; FA $9.6m; Misc Inc $1.8m209,60025,000
TOTALS$13,131,200$13,131,200$2,575,50019.6%$ 11,749,700$12,003,300
Final Budget$13,131,200$13,131,2002,575,500$ 11,749,700$12,003,300
FY27FY27Unaudited25%
ORIGINALREVISEDYTD% BUDGETFY26 Unaudited FY25 Unaudited
SANITATION FUNDBUDGETBUDGETREVENUESRECEIVEDCOMMENTSREVENUESREVENUES
1Sanitation Fee5,524,8005,524,8001,071,00019.4%4,887,100-
TOTALS$5,524,800$5,524,800$1,071,00019.4%$4,887,100$-
Final Budget$5,524,800$5,524,8001,071,000$-$-
FY27FY27Unaudited25%
ORIGINALREVISEDYTD% BUDGETFY26 Unaudited FY25 Unaudited
ELECTRIC REVENUE FUNDBUDGETBUDGETREVENUESRECEIVEDCOMMENTSREVENUESREVENUES
1Sales to Customers$ 107,128,600$ 107,128,600$24,715,00023.1%$ 96,089,700 $87,035,300
2Purchase Power Adjustment---0.0%--
3Utility Tax1,356,1001,356,100384,50028.4%1,529,7001,392,900
4Rate Stabilization Reserve---0.0%--
Penalties $52.5m; GSB $92.2m; Misc $29.9m; Green
5Miscellaneous Revenue1,085,0001,085,000237,00021.8% Energy $30.9m; All Other $31.5m1,385,3001,179,300
6Interest Income2,500,0002,500,000416,50016.7%3,003,2002,593,000
TOTALS$ 112,069,700$ 112,069,700$25,753,00023.0%$ 102,007,900$92,200,500
Final Budget$ 112,069,700$ 112,069,70025,753,000$ 102,007,900$92,200,500

10/16/2026 2 of 2

Página 106

Item #14.

City of Dover
Capital Investment Plan and Project Status Report
As of September 30, 2025
1st Quarter FY26

Points to Remember * Includes Project Carry-Forward Budget Amendment Ordinance # 2025-02 (approved by Council on 2/10/25). * Original Project Budget = Original Total Project Budget initially included in approved annual budget. * Latest Project Budget = Revised Total Project Budget included in most recent approved annual budget or one of the following: bond resolution, revolving fund loan agreement, Council approved budget amendment, or City Manager approved amendment as per the Budget Amendment Procedure. * Actual Expenditure/Expense totals are subject to change, due to delays to the month-end closing process. * Water Quality, Inflow/Infiltration, Distribution Upgrades, and New Development projects are budgeted as a blanket project, and once individual projects are identified and estimated, they are created using an allocation of the overall budgeted amount.

Community Police Grants Police Grants Total

Current Year Budget Funding Sources Governmental Transportation Federal State ARPA Water Wastewater Sanitation Electric CIP

Budget Balance $ 3,566,100 $ 346,300 $ - $ - $ 5,110,900 $ 93,500 $ 767,900 $ - $ 33,165,000 $ 43,049,700

Line of Credit (Heavy Duty Vehicles) -

State Loan Fund 2,217,500

Miscellaneous Receipts -

General Billings for Reimbursement of Expense -

Federal Grants -

State Grants 3,924,500 5,000,000 8,924,500

Transfer from Water/WW Impact Fee Reserve 282,500 282,500

Transfer from Water/Wastewater Oper. Fund 1,280,600 1,280,600

Transfer from General Fund 5,720,400 5,720,400

Sanitation Services 735,000 735,000

Transfer from Lodging Tax 500,000 500,000

Transfer from Capital Asset Reserve -

Transfer from Future Capacity Reserves -

Interest Income 50,000 50,000

Total Funding Sources $ 13,711,000 $ 346,300 $ - $ - $ 5,110,900 $ 8,924,100 $ 767,900 $ 735,000 $ 33,165,000 $ 60,542,700

1 of 13 1ST QTR FY26 CIP-PROJECT STATUS REPORT

Página 107

Item #14.

PROJECT STATUS REPORT - GENERAL FUND

1st Quarter FY26 - as of September 30, 2025

PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR

Original Latest Project Original Revised Fiscal Project Account Project Project To Date Fiscal Year Fiscal Year YTD Budget Code Item Obj/Ele Budget Budget Expenses Budget Budget Charges Balance Status

Fire Department11-14-99-
FR1800Annual Contribution for Engine 554025$777,000$777,000$381,886$77,700$77,700$77,672$28 Paying monthly
FR2000Annual Contribution for Squad #1 (Rescue)54025956,000834,000291,71483,40083,40083,34753 Paying monthly
FR2200Annual Contribution for Engine 154025770,000852,200246,322123,200123,200123,16139 Paying monthly
FR2400Tower Ladder 2540251,623,6001,623,600377,169282,300330,100331,930(1,830) Paying monthly
---Portable Command Post540257,9507,9507,950--7,950(7,950) DelDOT agreement #22-P-PROG-56
CT2256Traffic Safety Vehicles54025-624(624) DelDOT agreement #22-P-PROG-56
Total Fire Department$4,134,550$ 4,094,750$ 1,305,041$566,600$614,400$624,683$(10,283)
Police11-17-00-
---Misc Automobiles54022$831,600$ 1,694,900$ 1,383,886$311,014
PD2301Police Officer Body Worn Cameras & Tasers54031$876,400$903,000$582,133229,500229,500229,47624 Ongoing
PD2302Axon In-car Cameras54031368,000368,600-18,10018,100-18,100 Completed
PD2501Police Property Security Fencing5403136,10036,100-215,800215,800-215,800 Ongoing
PD2502Police Department Academy 2nd Floor HVAC54031193,1007,900249,850193,100193,100249,850(56,750) Ongoing
Total Police$1,473,600$ 1,315,600$831,983$ 1,488,100$ 2,351,400$ 1,863,212$488,188
Streets12-18-35-
---Trucks54023$215,000$738,400$191,954$546,446 Veh #322 received
---Misc. Equipment54025180,800173,300146,91626,384 Hot Box Trailer #393 & Roller #307 received
ST2003Meeting House Branch54030$1,115,600$266,000$79,159-266,000$79,158.73186,841Design Ongoing
ST21012021 Street & Alley Prog-N Bradford St54031500,0001,115,600774,430-807,800774,43033,370Complete, awaiting final invoice
ST22012022 Street & Alley Prog-N Bradford St54031344,500344,500591,134-344,500295,56748,933Complete, awaiting final invoice
ST2302FY23 Street Program540311,102,700-976,531-623,100496,919126,181Complete
ST2501Street, Concrete, and Alley Program54030500,0001,115,600-----Project Cancelled for FY25
ST2502Community Signs5403160,00020,00020,00020,00020,00020,0000Complete
Total Streets$3,622,800$ 2,861,700$ 2,441,254$415,800$ 2,973,100$ 2,004,945 $968,155
Grounds12-18-51-
---Trucks54023$80,000$80,00070,806$9,194 Truck being assembled at Dealer
Total Grounds$80,000$80,000$70,806$9,194
Stormwater12-18-60-
---Trucks54023$-$295,500$287,326$8,174 Leaf truck #363 received
SW2204East Lake Garden Basin Improvements54030$580,000$-$44,500----
SW2206MS4 Inventory/Inspection & Green Technology5403143,600200,00043,519100,000200,00052,354147,646 Data collection is complete for FY25
Project awarded, awaiting start date-late
SW2303Persimmon Park Place Drainage Basin Impr.540311,200,0001,200,000646-1,200,000-1,200,000 summer
SW2305FY23 Misc. Emergency Storm Sewer Repairs54031350,000387,300634,137-387,300311,01776,283
SW2401FY24 Misc. Emergency Storm Sewer Repairs5403188,00088,00087,825-88,00087,825175
SW2407Water Street Flooding Design54031-25,30023,000-25,30023,0002,300 Project 95% complete
SW2501FY25 Misc. Emergency Storm Sewer Repairs54031490,00094,00066,15094,00094,00066,15027,850 An emergency repair is in progress

101 2 of 13 1ST QTR FY26 CIP-PROJECT STATUS REPORT

Página 108

Item #14.

PROJECT STATUS REPORT - GENERAL FUND

1st Quarter FY26 - as of September 30, 2025

PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR

Original Latest Project Original Revised Fiscal Project Account Project Project To Date Fiscal Year Fiscal Year YTD Budget Code Item Obj/Ele Budget Budget Expenses Budget Budget Charges Balance Status Stormwater (continued)

SW2502Meeting House Branch Drainage Improvements5403114,400,0001,250,000-1,250,0001,250,000-1,250,000Design ongoing
SW2503West Street Flooding Improvements54031800,000125,000-125,000125,000-125,000Project cancelled
SW2505The Greens of Dover/Lamplighter Ln SW Improv.54031150,00025,00019,59225,00025,00019,5925,408Complete
SW2506Lynnhaven Drive Flooding Improvements54031155,00025,00022,80025,00025,00022,8002,200Complete
SW2409/SW2507 Downtown Dover Upgrades - Stormwater54031245,000276,0003,916245,000276,0003,916272,08430% Design Completed
Moved to FY26 due to quotes exceeding budget
SW2508White Oak Ditch5403185,00085,000-85,00085,000-85,000
SW2509Vehicle Pole Barn54031300,000290,000-300,000290,000-290,000 Moved to FY27
TOTAL STORMWATER FUND$18,306,600$ 4,070,600$901,583$ 2,249,000$ 4,366,100$873,979$ 3,492,121
Parks & Recreation13-15-12-
---Other Equipment54025$60,000$60,000$60,000 $- Chipper #587 received

Contractor has been scheduled to finish
54031

PR2300Dover Park Splash Pad$200,000$441,600$187,801-441,600186,651254,950 concrete work
Contractor working on finishing floor and check
54031
PR2301Dover Park Building245,400188,92956,471 list
PR2401Dover Park ADA Playground54031800,000182,800623,563-182,8004,500178,300 Seeking funding/contractor for site work
PR2502Schutte Park Skate Park540311,100,0001,100,00021,6101,100,0001,100,00021,6101,078,390 Working with Engineer on plans
Total Parks & Recreation$2,100,000$ 1,724,400$832,974$ 1,160,000$ 2,029,800$461,689$ 1,568,110
Procurement/Inventory15-27-99-
---Other Equipment54025$-$70,000$69,802$198 Forklift #120 received
CS2501Warehouse Flat Roof Replacement54031$220,000$220,000$139,900220,000220,000139,90080,100 Complete
CS2502Fuel Pump Island Upgrade54031600,000683,000-600,000683,000-683,000 Project moved to FY26
Total Procurement/Inventory$820,000$903,000$139,900$820,000$973,000$209,702$763,298
Fleet Maintenance15-28-99
---Other Equipment54025$-$-398(398) Parts received - EV grant
Total Fleet Maintenance$-$-$398$(398)
Information Technology16-22-99-
IT2404Replace 3 servers54028$42,000$33,700$8,854$-$33,700$580.47 $33,120
IT2406Barracuda Backup5402840,00022,40013,611-22,400$13,611.228,789 To be paid out monthly for the next 4 years.
IT2503Server/San Replacement5402840,00037,50040,00037,500$36,463.491,037 Purchased and in service
IT2504Replacement of Cisco Switches5402812,00012,00038,50312,00012,000$20,906.17(8,906) Switches purchased and being paid off
IT2506Rewiring City Hall Internet Cable5402860,00060,00014,55360,00060,000-60,000 Waiting for quote from vendor
IT2507Reed Street Network Reconfiguration54028-6,60030,034-6,600$12,437.54(5,838) $7,000 in grant funding
Total Information Technology$194,000$172,200$75,521$112,000$172,200$83,999 $88,201

TOTAL GENERAL FUND $ 30,651,550 $ 15,142,250 $ 6,528,256 $ 6,891,500 $ 13,560,000 $ 6,193,412 $ 7,366,588

101 3 of 13 1ST QTR FY26 CIP-PROJECT STATUS REPORT

Página 109

Item #14.

PROJECT STATUS REPORT - COMMUNITY TRANSPORTATION FUND

1st Quarter FY26 - as of September 30, 2025

PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR

Original Latest Project Original Revised Fiscal Project Project Project To Date Fiscal Year Fiscal Year YTD Budget Code Item Budget Budget Expenses Budget Budget Charges Balance Status Community Transportation - 203-12-99

CT2322Dover Little League$221,400$336,600$296,316$40,000$336,600$296,316$40,284 Complete
CT2533Boggs Drive/Kerbin Street162,300162,30049,976-162,30049,976112,324 Kerbin St Complete, Boggs CCW
C/F for past projects; to be repurposed-23,000-23,000 July

TOTAL COMMUNITY TRANSPORTATION FUND $ 383,700 $ 498,900 $ 346,292 $ 40,000 $ 521,900 $ 346,292 $ 175,608

203 4 of 13 1ST QTR FY26 CIP-PROJECT STATUS REPORT

Página 110

Item #14.

PROJECT STATUS REPORT - POLICE FEDERAL GRANTS

1st Quarter FY26 - as of September 30, 2025

PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR

OriginalLatestProjectOriginalRevisedFiscal
ProjectProjectProjectTo DateFiscal YearFiscal YearYTDBudget
CodeItemBudgetBudgetExpensesBudgetBudgetChargesBalanceStatus
Federal Police Grants - 207-11-17-33
Expected completion by
GM2312 - Line 3Fibre Optic Upgrade$-$94,200$94,126$-$94,200$94,126$74 12/31/25.
G2310 - EquipLicense Plate Reader Cameras171,890211,309245,048-211,309211,309-

TOTAL FEDERAL POLICE GRANTS $ 171,890 $ 305,509 $ 339,174 $ - $ 305,509 $ 305,435 $ 74

207 5 of 13 1ST QTR FY26 CIP-PROJECT STATUS REPORT

Página 111

Item #14.

PROJECT STATUS REPORT - POLICE STATE GRANTS

1st Quarter FY26 - as of September 30, 2025

PAST, CURRENT & FUTURE BUDGETSCURRENT FISCAL YEAR
OriginalLatestProjectOriginalRevisedFiscal
ProjectProjectProjectTo DateFiscal YearFiscal YearYTDBudget
CodeItemBudgetBudgetExpensesBudgetBudgetChargesBalanceStatus
State Police Grants - 209-11-17-32
G2404Night Vision Equipment$-$45,800$32,997$-$45,800$32,997$12,803 Received
GS2501Backup Tape Library System30,00030,00029,96930,00030,00029,96932 Complete
GM2501Virtual Reality Simulation System305,700305,700305,701305,700305,700305,701(1)

TOTAL STATE POLICE GRANTS $ 335,700 $ 381,500 $ 368,667 $ 335,700 $ 381,500 $ 368,667 $ 12,833

209 6 of 13 1ST QTR FY26 CIP-PROJECT STATUS REPORT

Página 112

Item #14.

PROJECT STATUS REPORT - ARPA FUND

1st Quarter FY26 - as of September 30, 2025

PAST, CURRENT & FUTURE BUDGETSCURRENT FISCAL YEAR
OriginalLatestOriginalRevisedFiscal
ProjectProjectProjectPreviousFiscal YearFiscal YearYTDBudget
CodeItemBudgetBudgetExpensesBudgetBudgetChargesBalanceStatus
ST2301FY23 Street, Concrete, and Alley Program$ 1,200,000$ 1,401,000$919,714$ 1,401,000$ 1,401,000$-$ 1,401,000 Complete
WD2302Elevated Water Tower Maint. - Aero Park655,000-654,615---- Complete
WD2303Future Well Installation2,234,500-2,234,500---- Complete
WD2304Well #9 Improvements319,000-133,979---- Complete
WQ2304Water Quality Improvements-West St Alley346,500-281,735--62,207(62,207) Complete
WW2307Lepore Road Sanitary Sewer Upgrade317,000------ Cancelled
TOTAL ARPA FUND $ 5,072,000$ 1,401,000$ 4,224,542$ 1,401,000$ 1,401,000$62,207$ 1,338,793

210 7 of 13 1ST QTR FY26 CIP-PROJECT STATUS REPORT

Página 113

PROJECT STATUS REPORT - WATER FUND Item #14.
1st Quarter FY26 - as of September 30, 2025

PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR

Original Latest Project Original Revised Fiscal
Project Project Project To Date Fiscal Year Fiscal Year YTD Budget
Code Item Budget Budget Expenses Budget Budget Charges Balance Status
Water Engineering
--- Trucks $ 26,900 $ 26,900 $ 25,612 $ 1,288 Vehicle #427 received

Water

WD2300Meter Reading Technology Upgrade$30,000$30,000$--30,000-30,000Project Cancelled
WD2401Portable Emergency Generator16,9008,6009,500-8,600-8,600Complete
WD2507GIS Utility Network Upgrade160,000160,000141160,000160,000141159,859Work Underway 35% complete
WD2509Portable Emergency Generator70,00070,000-70,00070,000-70,000Project awarded, awaiting fabrication
WD2503Water Modeling Software46,00046,000-46,00046,000-46,000Complete
WD2205Future Well Installation1,415,400637,300392,877-637,300345,062292,238 Complete
WD2306Water Tank Concrete Rehab20,000109,000--109,000-109,000 Complete
WD2307Stonebrook East Water Main Increase26,00026,000--26,000-26,000 Developer non-responsive
WD2403Carport for Mini Excavator12,000140,600--140,600-140,600 Complete
WD2405Well #9 Improvements1,000,0001,700,000-700,0001,700,000-1,700,000 Work underway
WD2408Asset Management Plan100,000100,0004,728-100,0004,72895,272 Project underway, research phase
WD2409Facility Improvements @WTP185,00098,80096,804-98,80096,8041,996 Complete
WD2501Wellhead Redevelopment Program466,000166,000166,000166,000166,000166,000- Complete
WD2502Well 6 VFD57,00057,000-57,00057,000-57,000 Completed without using CIP project
WD2503Predictive Water Main Leak Modeling46,000-45,980--45,980(45,980)
WD2504Elevated Water Storage Tank Maintenance96,70096,70048,30896,70096,70048,30848,393 Spot repairs pending
WD2505SCADA Equipment Upgrade975,000975,000-975,000975,000-975,000 Project needs to be re-bid
WQ2303Water Quality Impr. - North State Street1,854,00029,7001,013,047-29,70016,23013,470 Complete
WQ2306Brandywine Lead and Copper Rule115,000------ Project 50% complete
WQ2401Water Quality Improvements1,707,3002,250,000--2,250,000-2,250,000 Awaiting agency approvals
WQ2403Downtown Dover Upgrades - Water--17,634--17,634(17,634) Awaiting agency approvals
WQ2502Miscellaneous Emergency Water Repairs85,00085,00035,68085,00085,00035,68049,320 Complete
WQ2503Downtown Dover Upgrades - Water1,101,0001,101,000-1,101,0001,101,000-1,101,000 30% Design Completed

Water Treatment Plant

--Trucks---$-$-$71,767$(71,767) Vehicle #622 received
WD2508WTP Improvements$ 5,885,000$956,800$-885,000956,800-956,800 Design underway
TOTAL WATER FUND $ 15,469,300$8,843,500$1,830,697$4,368,600$8,870,400$873,945$7,996,455

401 8 of 13 1ST QTR FY26 CIP-PROJECT STATUS REPORT

Página 114

PROJECT STATUS REPORT - WASTEWATER FUND Item #14.
1st Quarter FY26 - as of September 30, 2025

PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR

Original Latest Project Original Revised Fiscal Project Project Project To Date Fiscal Year Fiscal Year YTD Budget Code Item Budget Budget Expenses Budget Budget Charges Balance Status Wastewater --- Trucks $ 520,100 $ 640,100 $ 476,341 $ 163,759 Vehicle #692 received

WW2300 Meter Reading Technology Upgrade $ 30,000 $ 30,000 $ - - 30,000 - 30,000 Project Cancelled

WW2303Emergency Sanitary Sewer Repairs160,000-59,698--59,698(59,698) Complete
WW2308Heatherfield Pump Station Repl.45,00013,40038,200-13,4004,0129,388 Awaiting final deliverables
WW2310Miscellaneous Sanitary Sewer Rehab910,900910,0001,056,195-910,000756,900153,100 Project 90% Complete
WW2401Inflow/Infiltration Removal394,500394,500--394,500-394,500 Project 90% Complete
Miscellaneous Emergency Sanitary Sewer
WW2402Repairs443,000269,200286,563-269,200112,789156,411Awaiting materials for installation
WW2403Pump Station #7 Upgrades350,000655,00031,753-174,10029,503144,598Project to be re-programmed
WW2404GIS Utility Network Upgrade150,000800,000606,054-150,000138,84111,15995% complete
WW2406Turnberry Pump Station Repl.1,117,500889,326-1,117,500889,326228,174Project 80% complete
WW2407Asset Management Plan4,728-100,0004,72895,272Project underway, research phase
WW2408Fence Installation @ Fox Hall PS30,00012,800--12,800-12,800Project Cancelled
WW2409Cedar Chase Pump Station Repl.30,00016,5002,829-16,5002,82913,671Project 90% Complete
WW2412Downtown Upgrades - Wastewater30,00046,600--46,600-46,60030% Design Completed
FY25 Misc. Emerg. Sanitary Sewer
WW2501Repairs900,000173,2005,832170,000173,2005,832167,368Complete
WW2502Heatherfield Pump Station Repl.545,000545,000165,122545,000545,000165,122379,878Project to be bid in FY26, design issues
WW2504White Oak Road Improvements865,00065,000-65,00065,000-65,000Project awarded, awaiting schedule
WW2506Downtown Upgrades - Wastewater354,000354,000-354,000354,000-354,000Design ongoing
WW2507Puncheon Run PS Roof Replacement37,00052,20052,16837,00052,20052,16832Complete

TOTAL WASTEWATER FUND $ 5,274,400 $ 5,454,900 $ 3,198,467 $ 1,691,100 $ 5,064,100 $ 2,698,089 $ 2,366,012

403 9 of 13 1ST QTR FY26 CIP-PROJECT STATUS REPORT

Página 115

PROJECT STATUS REPORT - SANITATION FUND Item #14.
1st Quarter FY26 - as of September 30, 2025

PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR

Original Latest Project Original Revised Fiscal Project Account Project Project To Date Fiscal Year Fiscal Year YTD Budget Code Item Obj/Ele Budget Budget Expenses Budget Budget Charges Balance Status Sanitation 43-70-99 --- Trucks 54023 $ 739,000 $ 1,191,000 437,608 $ 753,392 Veh #449 & 447 received; #441 & 448 on order

TOTAL SANITATION FUND $ - $ - $ - $ 739,000 $ 1,191,000 $ 437,608 $ 753,392

405Page 115
10 of 131ST QTR FY26 CIP-PROJECT STATUS REPORT

Página 116

PROJECT STATUS REPORT - ELECTRIC FUND Item #14.
1st Quarter FY26 - as of September 30, 2025

PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR

Original Latest Project Original Revised Fiscal Project Project Project To Date Fiscal Year Fiscal Year YTD Budget Code Item Budget Budget Expenses Budget Budget Charges Balance Status Engineering --- Misc Automobiles $ 130,000 $ 179,500 $ 177,394 $ 2,106 Vehicles #784 & 786 received

EE2113/2317ArcFM Migration to Elec. Util. Network$270,000$160,000$277,305---- 80% complete
EE2202SCADA Master Hardware Replacement550,000550,000307,166-242,900-242,900 60% complete
EE2315SCADA Upgrade100,00031,00068,978-31,000-31,000 80% complete
EE2415Multiplexer Replacement130,000165,000164,645-165,000164,645355 Complete
EE2501Substation Battery Replacement127,00015,00017,42115,00015,00017,421(2,421) Complete
EE2523Substation Component Replacement150,00015,000-30,00015,000-15,000 Recurring project
EE2524Substation HVAC146,000146,000145,359-146,000145,359641 Complete
Project should be cancelled, waiting for
EE2408Cartanza Substation Foundation Repair85,000-3,500---- next budget approval, to start new project
EE2522Small Cell Wireless Improvements150,00030,000-30,00030,000-30,000 Recurring project
EE2411LED Lighting Conversion400,000127,000293,178-127,00020,211106,789 Complete
EE2090DAFB CT/PT Replacement73,00073,00071,514---- Complete
EE2313/2416/2513 Transmission Line Maintenance600,00050,000134,20250,00050,00044,7535,247 Recurring project
EE2219/2409/2510 McKee Switch Yard Reconfiguration347,000116,800670,439110,000116,800104,26912,531 Complete
EE2505Electric System Study750,000750,000-750,000750,000-750,000 5% Complete
EE2016/2215/2410 Garrison Oak Tech Park Substation8,250,00014,750,0006,624,2902,000,0004,746,3001,820,2732,926,027 35% complete
EE2402Woodcrest Overhead to Underground394,000-356,151--28,733(28,733) Complete
EE2303/2404Town Point Conversion914,000-479,851---- Complete
EE2502Farmview Substation Renovation245,000245,000149,588245,000245,000149,58895,412 Complete
EE2511Primary Metering OVH-UGD202,000202,000162,295202,000202,000162,29539,705 Recurring project
EE2515Fox Road Overhead Rebuild63,00063,00052,98363,00063,00052,98310,017 75% Complete
EE2516William Street Overhead Rebuild89,00089,00062,92089,00089,00062,92026,080 Complete
EE2517Sounds of Tri-State Rebuild63,00063,00058,65063,00063,00058,6504,350 Complete
EE2518Mitscher road Overhead Rebuild41,00041,00035,86541,00041,00035,8655,135 Complete
EE2519Transmission Pole Replacement504,000168,00054,369168,000168,00054,369113,631 Not started
Total Engineering$14,643,000$ 17,849,800$ 10,190,669$3,986,000$7,485,500$3,099,727$4,385,773

Electric Generation

EG2203Plant Decommissioning$14,000,000$1,333,000$2,172,289$-$1,333,000$1,703,017$(370,017) Complete
EG2302Plant Decommissioning----370,00089,193280,807 95% Complete
Sulfuric acid and caustic soda tanks
drained and rinsed. Scaffolding installed for
insulation removal and tank demolition.
EG2404VanSant Water Treatment System Rem60,00060,00040,238-60,00040,23819,763 Project approximately 80% complete.
Inspection 100% complete. Repairs to be
completed later this year following
discussion with Electric Department
Director and Budget Analyst. Bids received
for repairs and painting. Overall project
EG2501VanSant Out of Service Fuel Tank Inspection400,000400,00071,977400,000400,00071,977328,023 approximately 30% complete.
Recurring project. No additional
EG2502VanSant Unit 11 Component Replacements170,00070,00055,27570,00070,00055,27514,725 expenditures this FY.
Total Electric Generation$14,630,000$1,863,000$2,339,779$470,000$2,233,000$1,959,700$273,300

Transmission & Distribution

---Automobiles$130,000$130,000$128,068$1,932 Vehicles #767 & 799 received
---Trucks460,000808,800-808,800 Vehicle #766
---Other Equipment-440,200-440,200 Vehicle #775 carried forward
EE2521Emergency Component Replacement$260,000$69,900$127,08665,00069,900127,086(57,186) Recurring project
TD2401Dover Downs Metering31,0004,200615-4,2006153,585 Not started
Transmission & Distribution (continued)

411 11 of 13 1ST QTR FY26 CIP-PROJECT STATUS REPORT

Página 117

PROJECT STATUS REPORT - ELECTRIC FUND Item #14.
1st Quarter FY26 - as of September 30, 2025

PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR

OriginalLatestProjectOriginalRevisedFiscal
ProjectProjectProjectTo DateFiscal YearFiscal YearYTDBudget
CodeItemBudgetBudgetExpensesBudgetBudgetChargesBalanceStatus
TD2402Utility Pole Testing125,000-54,000--54,000(54,000) 90% Complete
TD2405Janes Road Conversion179,20017,3009,017-17,3009,0178,283 Complete

UG Transformers locations as follows:

EE2525New Developments1,000,0001,000,000503,3591,000,0001,000,000503,359496,641
TD2205Calvary Baptist Church19,80019,83219,832Complete
TD2301Rojan Meadows Phase 118,60018,60018,60075% Complete
TD2308El Azteca Dover---Cancelled
TD2411Commerce Way Warehouse35,900--Cancelled
TD2412Eden Hill Farms Phase 4A78,50097,64097,64050% Complete
TD2414Eden Hill OKH Phase 222,80016,0329,300Complete
TD2425966 Kitts Hummock Rd.29,0004,52858Complete
TD2426DNREC EV Charger13,850--Complete
TD2427110 Lafferty Ln Warehouse3,8003,7563,756Complete
TD2511The Edge at Dover235,450181,805181,805Complete
TD2516Caliber Collision37,70031,10531,105Complete
TD2517Dickinson Visitors Center28,60022,41322,413Complete
TD2519Byler's Warehouse10,70010,68610,686Complete
TD2520King Cole Campground5,00021,714Complete
TD2528Kent County Septage Facility23,85350% Complete
TD252987 Moonshine Ct8,6006,882Complete
TD2530Kent County EV Charger19,832Complete
TD2534Village of Mapledale28,48750% Complete
TD2538St Jones EV7,39550% Complete

UG Conductors locations as follows:

EE2525New Developments900,000900,000813,924900,000900,000813,92486,076
TD2110DAFB Welch Elementary18,60018,620-90% Complete-waiting on customer
TD2205Calvary Baptist Church57,40057,41948,860Complete
TD2301Rojan Meadows Phase 1122,800122,755-75% Complete
TD2303Kent Courthouse347,100347,058-75% Complete
TD2308El Azteca Dover---Cancelled
TD23091001 N DuPont EV Charger10,80010,757-Complete
TD2315DELDOT Kenton Rd895,300895,316409,20230% Complete
TD2411Commerce Way Warehouse22,000--Not started
TD2412Eden Hill Farms Phase 4A541,70068,82760,02950% Complete
TD2413Eden Hill Farms Apartment-22,43913,641
TD2414Eden Hill OKH Phase 2233,600203,90713,64150% Complete
TD2425966 Kitts Hummock Rd.24,50020,92020,920Complete
TD2426DNREC EV Charger4,950--Complete
TD2427Lafferty Ln Warehouse3,1003,13931Complete
TD2511The Edge at Dover147,3004,7794,779Complete
TD2516Caliber Collision37,150137,36710% Complete
TD2517Dickinson Visitors Center37,1509,10510% Complete
TD2519Byler's Warehouse37,4009,0049,004Complete
TD2520King Cole Campground15,50037,39437,394Complete
TD2528Kent County Septage Facility12,090Complete
TD252987 Moonshine Ct2,6505,498Complete
TD2530Kent County EV Charger1,935Complete
TD2534Village of Mapledale10,760Complete
TD2538St Jones EV19,593Complete

411 12 of 13 1ST QTR FY26 CIP-PROJECT STATUS REPORT

Página 118

PROJECT STATUS REPORT - ELECTRIC FUND Item #14.
1st Quarter FY26 - as of September 30, 2025

PAST, CURRENT & FUTURE BUDGETS CURRENT FISCAL YEAR

Original Latest Project Original Revised Fiscal
Project Project Project To Date Fiscal Year Fiscal Year YTD Budget
Code Item Budget Budget Expenses Budget Budget Charges Balance Status
Transmission & Distribution (continued)
UG Meters locations as follows:

EE2525New Developments535,000535,00092,555535,000535,00092,555442,445
TD2110DAFB Welch Elementary1,8001,758-Waiting on contractor
TD2205Calvary Baptist Church---Complete
TD2210Verona Woods Phase 3/46,1006,097-85% Complete
TD2301Rojan Meadows Phase 117,90017,867-50% Complete-waiting on customer
TD2308El Azteca Dover---0% Complete-waiting on customer
TD23091001 N DuPont EV Charger1,5001,489-Not started
TD2314CT Site Repairs & Maintenance32,00031,974-70% Complete
TD2315DelDOT Kenton Rd37,50037,54592430% Complete
TD2411Commerce Way Warehouse1,800--Not started
TD2412Eden Hill Farms Phase 4A9,20010,83310,83335% Complete
TD2414Eden Hill OKH Phase 24,1002,275-50% Complete
TD2425966 Kitts Hummock Rd.4004,0664,066Complete
TD2426DNREC EV Charger-370370Complete
TD2510Lafferty Ln Warehouse3,1001,8751,875Complete
TD2511The Edge at Dover23,45033,31533,315Not started
TD2516Caliber Collision1,65022,51810% Complete
TD2517Dickinson Visitors Center1,6501,39510% Complete
TD2519Byler's Warehouse3,1001,3951,395Complete
TD2520King Cole Campgroung1,200916916Complete
TD2523Preston Autobody1,191Complete
TD2528Kent County Septage Facility8,997Not started
TD252987 Moonshine Ct100389Complete
TD2530Kent County EV Charger52Complete
TD2534Village of Mapledale3,30950% Complete
TD2538St Jones EV1,010Complete
Total Transmission & Distribution$6,283,950$2,526,400$3,981,063$3,090,000$3,905,400$ 1,728,624.56$2,176,775

Administration

EE1819/EA2304 Reed St HVAC Overhaul2,675,2001,078,6003,691,254-1,078,600$1,078,55446 Complete
Total Administration$2,675,200$1,078,600$3,691,254$-$1,078,600$1,078,554$46

FN1701 Purchase of ERP System $ 1,313,400 $ - $ 911,280 $ - $ - $78,422 $ (78,422) In progress

TOTAL ELECTRIC FUND $ 39,545,550 $ 23,317,800 $ 21,114,045 $ 7,546,000 $ 14,702,500 $ 7,945,027 $ 6,757,473

411 13 of 13 1ST QTR FY26 CIP-PROJECT STATUS REPORT

Página 119

Item #15.

Página 120

Item #15.

Página 121

Item #16.

Página 122

Item #17.

CITY OF DOVER, DELAWARE

ACTION FORM

PROCEEDING: City Council DEPARTMENT OF ORIGIN: City Manager’s Office SUBMITTED ON: October 21, 2026 PREPARED BY: Sharon J. Duca, P.E., ICMA-CM, City Manager REVIEWED BY: Sharon J. Duca, P.E., ICMA-CM, City Manager and Patricia M. Marney, Controller / Treasurer

SUBJECT: Reallocation of Budgeted Personnel Resources TIMETABLE: Posting for applicable positions upon approval of City Council and receipt of associated resignation/retirement paperwork. RELATED PROJECT: X REFERENCE: FY27 Budget

EXPENDITURE REQUIRED: $329,000

AMOUNT AVAILABLE: $1,011,000

FUNDING SOURCE (Dept./Page in CIP & Budget): FY27 Personnel Budget for Electric Department and Police Department.

STAFF RECOMMENDATION:

Authorize the City Manager to unfreeze/hire the Groundsworker position in the Electric Department as well as start the hiring process for the Electric Director and Accreditation Manager positions upon receipt of required resignation/retirement paperwork.

BACKGROUND AND ANALYSIS:

Electric Department:

As part of the FY27 Budget, a Groudworker position was frozen. Since that time, a higher level Lineman has resigned/retired. In addition, two electrical engineers have resigned/retired, and the Electric Director has submitted paperwork for resignation/retirement. Evaluating the budgetary implications of these personnel changes and resulting needs of the Department, it has been determined that the resignations/retirements will result in approximately $311,000 in savings. Replacement of these positions is critical but will take some time. In light of the implications of these changes, and in addition to standard replacement practices, it is requested to unfreeze the Groundworker position and start posting for the Electric Director position, potentially allowing for overlap with the current Director. The conservatively projected cost of this proposal is approximately $271,000. Due to these projections, the proposal will stay within the approved budget levels.

Página 123

Item #17.

Police Department:

The Police Department is anticipating the resignation/retirement of the Accreditation Manager for the Department. It has been requested that this position be posted to allow for a training overlap of the position. Due to various vacancies within the Department, salaries and overtime costs have been evaluated as well as the addition of the overlap request with the Accreditation Manager. This evaluation of the proposal led to an approximate differential of $700,000 in savings. While overtime must continue to be monitored due to vacancies, adequate funding is available for the overlap which is estimated to cost approximately $58,000. (It should be noted that the proposed overlap would not occur until paperwork has been received regarding the resignation/retirement.)

Página 124

Item #18.

City of Dover

PROPOSED ORDINANCE #2026-15

1BE ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF DOVER, IN
2COUNCIL MET:
3
4 That Chapter 42 –Environment, be amended by inserting the text indicated in bold, blue, italics,
5and deleting the text indicated in red strikethrough as follows:
6
7Sec. 42-3. Lighting
8 (a) Generally. It shall be unlawful for any person to install, maintain, operate, or cause to
9 be installed, maintained, or operated, any excessive, unreasonable, or unusually bright
10 lighting, glare, or illumination that annoys, disturbs, injures, or endangers the
11 comfort, repose, health, peace, or safety of others, or creates a risk thereof, within the
12limits of the city.
13 (b) Exterior Lighting. All exterior lighting shall be installed, maintained, and operated to
14 minimize light trespass onto adjacent properties. The type, height, location, intensity,
15 and shielding of exterior lighting fixtures shall be designed and maintained so that
16 light is directed onto the subject property and does not unnecessarily shine, glare, or
17reflect onto adjacent buildings or properties.
18 (c) Light Trespass. Exterior lighting shall not be installed or operated in a manner that
19 causes excessive or unreasonable illumination, glare, or light trespass onto adjacent
20properties or public rights-of-way.
21 (d) Shielding. Where necessary to prevent excessive glare or light trespass, exterior
22 lighting fixtures shall be appropriately shielded, redirected, or adjusted to confine
23illumination to the subject property.
24 (e) Notice. Where a violation of this section is identified, the property owner shall be
25 notified of the violation and, when applicable, any complaint received concerning the
26 violation. The property owner shall take all reasonable and necessary action to correct
27 the violation and bring the premises into compliance with this section.
28 (f) Violations; penalties. Any property that violates any provision of this section shall be
29 subject to the fines and penalties provided in Appendix F—Fees and Fines.
30
31APPENDIX F - FEES AND FINES
32Chapter 42-3.- Lighting
Chapter 42.Environment
Sec. 42-3. Lighting
Subsec. (f) Violations; penalties, Initial Notice$0.00
Subsec. (f) Violations; penalties, Second Notice$100.00

Página 125

Item #18.

Subsec. (f) Violations; penalties, Third Notice$200.00
Subsec. (f) Violations; penalties, Fourth Notice$300.00
Subsec. (f) Violations; penalties, Fifth Notice$500.00
Subsec. (f) Violations; penalties, Sixth and Subsequent Notice$1000.00
33
34ADOPTED: *
35
36SYNOPSIS
37
38 This proposed ordinance establishes standards for exterior lighting within the City of Dover to
39 address excessive or unreasonable lighting, glare, illumination, and light trespass. The ordinance
40 requires exterior lighting to be installed, maintained, and operated in a manner that minimizes
41 impacts on adjacent properties and public rights-of-way. These amendments provide a specific
42 regulatory framework for addressing lighting-related complaints and violations while establishing
43 standards intended to prevent excessive lighting, glare, and light trespass from adversely affecting
44neighboring properties.
45
46(SPONSORS: ROCHA & DUCA)
47
48Actions History
4910/26/2026 – First Reading – City Council
50 10/13/2026 - Scheduled for Introduction - Legislative, Finance, and Administration Committee

Volver a esta reunión