Página 1
REGULAR COUNCIL MEETING
AGENDA
SEPTEMBER 14, 2015 - 7:30 P.M.
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA
DOVER, DELAWARE
OPEN FORUM - 15 MINUTES PRIOR TO OFFICIAL MEETING (7:15 P.M.)
THE “OPEN FORUM” SEGMENT IS PROVIDED TO EXTEND THE OPPORTUNITY TO THE GENERAL PUBLIC
TO SHARE THEIR QUESTIONS, THOUGHTS, COMMENTS, CONCERNS, AND COMPLAINTS. DISCUSSION OF
ANY ITEM APPEARING ON THE AGENDA AS A PUBLIC HEARING IS PROHIBITED DURING THE OPEN
FORUM AS AN OPPORTUNITY WILL BE PROVIDED DURING CONSIDERATION OF THAT ITEM. CITIZEN
COMMENTS ARE LIMITED TO THREE (3) MINUTES. COUNCIL IS PROHIBITED FROM TAKING ACTION
SINCE THEY ARE NOT IN OFFICIAL SESSION; HOWEVER, THEY MAY SCHEDULE SUCH ITEMS AS REGULAR
AGENDA ITEMS AND ACT UPON THEM IN THE FUTURE.
INVOCATION BY CHAPLAIN WALLACE R. DIXON
PLEDGE OF ALLEGIANCE LED BY COUNCILMAN BRIAN LEWIS
AGENDA ADDITIONS/DELETIONS
* CONSENT AGENDA
THOSE ITEMS ON THE COUNCIL AGENDA WHICH ARE CONSIDERED ROUTINE AND NON-
CONTROVERSIAL SHALL BE MARKED WITH AN ASTERISK (*) AND WILL BE ACTED UPON BY A SINGLE
ROLL CALL VOTE OF THE COUNCIL. THERE WILL BE NO SEPARATE DISCUSSION OF THESE ITEMS
UNLESS A MEMBER OF COUNCIL SO REQUESTS, IN WHICH EVENT THE MATTER SHALL BE REMOVED
FROM THE CONSENT AGENDA AND CONSIDERED A SEPARATE ITEM.
* 1. ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF AUGUST 24, 2015
2. RESOLUTION NO. 2015-13 - PRESENTATION - CITY OF DOVER BRONZE MEDAL - PATROLMAN
FIRST CLASS JAMES JOHNSON
* 3. DOVER HUMAN RELATIONS COMMISSION REPORT - MAY 27, 2015
A. ELECTION OF COMMISSION CHAIR
(COMMISSION ELECTED S. RENEE SMITH TO SERVE AS CHAIR)
B. DISCUSSION - RECENT EVENTS INVOLVING THE DOVER POLICE DEPARTMENT
(COMMISSION ACTION NOT REQUIRED)
C. SCHEDULING OF NOVEMBER 2015 MEETING DATE
(COMMISSION SCHEDULED MONTHLY MEETINGS TO BE HELD AT 5:15 P.M. ON THE
FOLLOWING DATES: JUNE 23, JULY 28, AUGUST 25, SEPTEMBER 29, OCTOBER 27, AND
NOVEMBER 17, 2015)
Página 2
COUNCIL AGENDA - SEPTEMBER 14, 2015 PAGE 2
* 3. DOVER HUMAN RELATIONS COMMISSION REPORT - MAY 27, 2015 (CONTINUED)
D. DHRC COMMITTEE UPDATES
(DUE TO TIME CONSTRAINTS THE BELOW ITEMS WERE DEFERRED)
D-1. GOVERNMENT POLICY, PROGRAMS, AND PRACTICES COMMITTEE (RUANE)
D-2. COMMUNITY ENGAGEMENT COMMITTEE (ROACH)
D-3. EDUCATION COMMITTEE (HENDERSON)
D-4. COMMUNICATIONS COMMITTEE (SMITH)
E. COMMISSION MEMBERS’ ANNOUNCEMENTS
(COMMISSION ACTION NOT REQUIRED)
* 4. DOVER HUMAN RELATIONS COMMISSION REPORT - JULY 28, 2015
A. CHAIR'S RESIGNATION FROM THE COMMUNICATIONS COMMITTEE
(COMMISSION RECOMMENDED ACCEPTANCE OF THE CHAIR'S RESIGNATION FROM THE
COMMUNICATIONS COMMITTEE)
B. DHRC COMMITTEE UPDATES
(COMMISSION ACTION NOT REQUIRED ON THE BELOW ITEMS)
B-1. GOVERNMENT POLICY, PROGRAMS, AND PRACTICES COMMITTEE (RUANE)
B-2. COMMUNITY ENGAGEMENT COMMITTEE (ROACH)
B-3. EDUCATION COMMITTEE (HENDERSON)
B-4. COMMUNICATIONS COMMITTEE (SMITH)
C. CHAIR 27-DAY UPDATE REPORT AND FEEDBACK
(COMMISSION ACTION NOT REQUIRED ON THE BELOW ITEMS)
C-1. MEETING WITH MAYOR AND CHIEF OF POLICE
C-2. MEETING WITH CHAIR, STATE COMMISSION AND THE STATE COMMISSION
SUPPORTIVE ROLE
C-3. MEETING WITH CITY COUNCIL PRESIDENT
C-4. SUGGESTED BUDGET TO CITY COUNCIL
C-5. TRAINING
C-6. COMMUNITY INVOLVEMENT
C-7. PUBLICITY
C-8. COMMISSIONERS (SKILLS, NETWORKS, INTERESTS)
C-9. BY LAWS
D. COMMISSION MEMBERS' ANNOUNCEMENTS
(COMMISSION ACTION NOT REQUIRED)
* 5. SAFETY ADVISORY AND TRANSPORTATION COMMITTEE REPORT - AUGUST 24, 2015
A. DISCUSSION - INCREASED CRIMINAL ACTIVITY - DOVER PARK/SILVER LAKE PARK
(COMMITTEE ACTION NOT REQUIRED)
B. CONCERNS OF OWENS MANOR RESIDENTS
(COMMITTEE ACTION NOT REQUIRED)
C. OVERVIEW OF DOVER POLICE DEPARTMENT POLICY REGARDING CONTACT, ARREST,
OR DETAINMENT OF UNDOCUMENTED OR ILLEGAL ALIENS
(COMMITTEE ACTION NOT REQUIRED)
D. DEBRIEFING/POST-MORTEM ON FIREFLY MUSIC FESTIVAL (PRESENTATIONS BY THE
DEPARTMENT OF PLANNING AND INSPECTIONS AND THE DOVER POLICE DEPARTMENT
AND SUMMARY OF DISCUSSION WITH REPRESENTATIVES FROM PERSIMMON PARK
PLACE, WILD MEADOWS, AND RESIDENTS ON PERSIMMON TREE LANE)
(COMMITTEE ACTION NOT REQUIRED)
Página 3
COUNCIL AGENDA - SEPTEMBER 14, 2015 PAGE 3
* 5. SAFETY ADVISORY AND TRANSPORTATION COMMITTEE REPORT - AUGUST 24, 2015
(CONTINUED)
E. PRIORITIZATION OF CITY OF DOVER STATE CAPITAL TRANSPORTATION PROGRAM
(CTP) PROJECTS
(COMMITTEE RECOMMENDED APPROVAL OF THE RECOMMENDED PRIORITY RANKING FOR
THE COMING YEAR, AS RECOMMENDED BY STAFF)
* 6. LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE REPORT - AUGUST 24, 2015
A. TRANSFER OF REAL PROPERTY FROM DELAWARE CIVIC CENTER CORPORATION TO
DELAWARE STATE UNIVERSITY
(COMMITTEE RECOMMENDED CONTINUING THE CONVERSATION AND INFORMATION
GATHERING FROM DELAWARE STATE UNIVERSITY (DSU), AS WELL AS THE CITY MANAGER,
AND FOR DSU TO COME BACK AT THE FIRST MEETING IN OCTOBER AND GIVE ANOTHER
PRESENTATION IN REGARD TO HOW THEY COULD ECONOMICALLY BENEFIT BOTH THE CITY
AND DSU )
B. SEMI-ANNUAL REVIEW - STATISTICS REGARDING JOBS AND BUSINESSES GAINED AND
LOST IN THE CITY OF DOVER SINCE JANUARY 2015 (DEFERRED BY COMMITTEE ON
AUGUST 10, 2015 DUE TO TIME CONSTRAINTS)
(COMMITTEE ACTION NOT REQUIRED)
* 7. MONTHLY REPORTS - JULY 2015
A. CITY ASSESSOR’S REPORT
B. CITY MANAGER’S REPORT
C. CITY PLANNER’S REPORT
D. CONTROLLER/TREASURER’S BUDGET REPORT
E. ECONOMIC DEVELOPMENT OFFICE REPORT
F. FIRE CHIEF’S REPORT
8. REQUEST FOR AUTHORIZATION TO REIMBURSE KENT COUNTY LEVY COURT - WATER MAIN
DIAMETER INCREASE (JASON LYON)
(STAFF RECOMMENDS AUTHORIZATION TO REIMBURSE KENT COUNTY LEVY COURT
$30,000 FOR THE INCREASED DIAMETER WATER MAIN THAT IS CURRENTLY BEING
INSTALLED TO SERVE THE KENT COUNTY RECREATION BUILDING ON NEW BURTON ROAD)
9. COUNCIL MEMBERS’ ANNOUNCEMENTS
/TM
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\COUNCIL-AGENDAS\2015\09-14-2015.WPD
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE
TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Página 4
REGULAR COUNCIL MEETING
The Regular Council Meeting was held on August 24, 2015 at 7:30 p.m. with Council President
Slavin presiding. Council members present were Mr. Anderson, Mr. Sudler, Mr. Neil, Mr. Lewis,
Mr. Cole, Mr. Hosfelt, Mr. Hare, and Mr. Hutchison.
Council staff members present were Police Chief Bernat, Mrs. Mitchell, Mrs. Townshend, Fire Chief
Hall, Mr. Koenig, City Solicitor Rodriguez, and Mrs. McDowell. Mayor Christiansen was also
present.
OPEN FORUM
The Open Forum was held at 7:15 p.m., prior to commencement of the Official Council Meeting.
Council President Slavin declared the Open Forum in session and reminded those present that
Council was not in official session and could not take formal action.
Ms. Janetta Guinn, 749 Slaughter Street, stated that her water meter is sitting in her driveway and
it is hard for her to get her cars back and forth. She indicated that if they park in the driveway they
risk having the landlord tow their cars, and if they park on the street they risk the Dover Police
towing the cars.
Responding to Ms. Guinn, Council President Slavin stated that they noted the situation with
Ms. Guinn’s driveway and the possible need for sidewalks in that area during their recent
walkthrough. Mr. Slavin suggested that she speak with Mrs. Ann Marie Townsend, Director of
Planning and Community Development, after the meeting.
Mr. Tyrone Ratu, a Dover citizen, stated that he thought the Open Forum should be televised for the
public so that everybody can see what is going on. He indicated that he would be protesting in front
of City Hall if it is not televised.
The invocation was given by Bishop Thomas L. Holsey, followed by the Pledge of Allegiance.
AGENDA ADDITIONS/DELETIONS
Mr. Hutchison moved for approval of the agenda, seconded by Mr. Neil and unanimously
carried.
Mr. Lewis requested that item #5A - Parks, Recreation, and Community Enhancement Committee
Report - August 10, 2015 - Exception Request to Allocate Down Payment Assistance Outside of the
Downtown Development District Target Area, be removed from the Consent Agenda.
Mr. Anderson requested that item #8 - Discharging the Ad Hoc Financial and Operational Advisory
Committee, be removed from the Consent Agenda.
Mr. Neil moved for approval of the Consent Agenda, as amended, seconded by Mr. Cole and
carried by a unanimous roll call vote.
Página 5
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 2
ADOPTION OF MINUTES - SPECIAL COUNCIL MEETINGS - BUDGET REVIEW OF
MAY 27-28 AND JUNE 1-3, 2015
The Minutes of the Special Council Meetings - Budget Review of May 27-28 and June 1-3, 2015
were unanimously approved by motion of Mr. Neil, seconded by Mr. Cole and bore the written
approval of Mayor Christiansen.
ADOPTION OF MINUTES - REGULAR COUNCIL MEETING OF AUGUST 10, 2015
The Minutes of the Regular Council Meeting of August 10, 2015 were unanimously approved
by motion of Mr. Neil, seconded by Mr. Cole and bore the written approval of
Mayor Christiansen.
PRESENTATION BY THE KIWANIS CLUB TO THE GREATER DOVER BOYS AND
GIRLS CLUB
Mr. Allan Kujala, Past President of the Kiwanis Club of Dover, presented Mr. Darrell Tingle,
Director of Business Development for the Boys and Girls Club, with a check representing the final
payment toward a $25,000 donation for construction of the new Boys and Girls Club facility.
Mr. Kujala stated that this is a worthwhile project that will greatly benefit the children of the Dover
community for many years to come. He challenged other service clubs to meet the Kiwanis
commitment to improve the world one child and one community at a time.
Mr. Kujala stated that the Kiwanis Club of Dover is proud to support numerous, meaningful projects
that benefit their community, noting that several years ago they donated $10,000 toward the
construction of the Dover Public Library, the largest such contribution by any service club located
here in the state capital.
Mr. Tingle thanked the Kiwanis Club and all those who have pitched in to make this facility a reality.
He noted that this is going to make a big difference in the lives of the children in this community by
giving them another place to go, grow, learn, and have fun.
PROCLAMATION - NATIONAL PREPAREDNESS MONTH
The City Clerk read the following Proclamation into the record:
WHEREAS, National Preparedness Month creates an important opportunity for City of Dover
residents to prepare their homes, businesses, and their communities for potential natural disasters
or terrorist attacks; and
WHEREAS, investing in emergency preparedness can reduce injuries, fatalities, and economic
devastation in our community and nation; and
WHEREAS, the Federal Emergency Management Agency's "Ready" Campaign, Citizen Corps, and
other federal, state, local, private, and volunteer agencies are working to increase public activities
to prepare for emergencies and to educate individuals on how to take action; and
WHEREAS, the Ready Campaign established four universal building blocks of emergency
preparedness, Be Informed, Make a Plan, Build a Kit and Get Involved with the 2015 National
Preparedness Month Theme being “Don't Wait. Communicate. Make your emergency plan today”;
and
Página 6
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 3
WHEREAS, emergency preparedness is the responsibility of every citizen of the City of Dover and
all citizens are urged to make preparedness a priority and work together, as a team, to ensure that
individuals, families, and communities are prepared for disasters and emergencies of any type, and
are encouraged to participate in preparedness activities and to be proactive in establishing sound
plans for addressing emergencies.
NOW, THEREFORE, I, ROBIN R. CHRISTIANSEN, MAYOR OF THE CITY OF DOVER,
DELAWARE do hereby proclaim the month of September 2015 as NATIONAL PREPAREDNESS
MONTH in the City of Dover, and encourage all citizens, businesses, and organizations to develop
their own emergency plan and work together toward creating a more prepared society.
MAYOR ROBIN R. CHRISTIANSEN'S VETO OF THE MOTION ADOPTED BY
CITY COUNCIL ON JULY 27, 2015 - TO AFFIRM CITY COUNCIL'S DECISION OF
MARCH 23, 2015, TO MOVE THE ECONOMIC DEVELOPMENT OFFICE UNDER THE
CITY MANAGER, WITH THE UNDERSTANDING THAT THIS MATTER WILL BE
REVISITED IN SEPTEMBER, WHICH COULD LEAD TO A DIFFERENT ACTION
Council President Slavin reminded members that, during the Regular Council meeting of
August 10, 2015, based on Deputy City Solicitor Pepper's legal opinion that Mayor Christiansen’s
veto notice was not provided within seven (7) days of the March 23, 2015 Council action and,
therefore, had no bearing, City Council unanimously accepted Deputy City Solicitor Pepper's
recommendation regarding the veto. He advised that, subsequently, Mr. Pepper provided a revised
legal opinion stating that, because City Council adopted the Fiscal Year 2016 Annual Operating
Budget, including the Mayor's Fiscal Year 2016 organizational chart showing the Police Department
and Economic Development Office under the Mayor, the March 23, 2015 motion to move
departments under the City Manager, as far as the Economic Development Office is concerned, was
reversed. Mr. Slavin noted that the effect of the July 27, 2015 motion affirming City Council's
decision of March 23, 2015 to move the Economic Development Office under the City Manager was
to revise the Mayor's organizational chart in the FY 2016 budget. Since the Mayor vetoed that
motion within the time required by the Charter, the Economic Development Office will remain under
the Mayor pursuant to the Mayor’s Fiscal Year 2016 Organizational Chart unless and until Council
overrides the veto.
Mr. Hare suggested that, with everything that is going on in the city, they should just leave things
as they are and let the Mayor be in charge of Economic Development and the Police Department,
just like it was before this discussion started. He felt that there were more important things to deal
with than worrying about who is going to report to whom and starting all these inner battles.
Mr. Hare moved to reset the form of government to what existed on March 8, 2015 with the
Police Department and the Economic Development Office reporting to the Mayor and the City
Manager, Controller/Treasurer, City Planner, City Assessor, and City Clerk reporting to
Council. All other departments will report to the City Manager. The motion was seconded
by Mr. Lewis and carried by a unanimous roll call vote.
Mr. Hare moved to cancel the Special Meeting scheduled for September 16, 2015 to discuss the issue
of Form of Government and Reporting Structure. After a brief discussion resulting in a consensus
of Council that their constituents should be included in the discussion, Mr. Hare withdrew his
motion.
Página 7
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 4
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE REPORT -
AUGUST 10, 2015
The Parks, Recreation, and Community Enhancement Committee met on August 10, 2015
with Chairman Anderson presiding.
Exception Request to Allocate Down Payment Assistance Outside of the
Downtown Development District Target Area
During the Parks, Recreation, and Community Enhancement meeting of
March 9, 2015, members considered the Review/Scoring of Community
Development Block Grant (CDBG) Applications. Members recommended awarding
$60,000 of the City’s CDBG grant allocation for public service activities to the City
of Dover Homeownership Assistance Program and that priority be given to the
Downtown Redevelopment Target Area as designated in the Dover Code until
January 2016, with funding to be re-evaluated at that time to see if there are funds left
over for the remainder of the City. The Committee’s recommendation was approved
by City Council during their Regular Meeting of March 23, 2015.
Mrs. Tracey Harvey, Planner I, stated that staff was requesting an exception to the
Committee’s recommendation to allow $20,000 of the approved funding for the City
of Dover homeownership program to be reallocated to a first time homebuyer who
was experiencing a hardship and was currently under contract to purchase a home
outside of the Downtown Development District (DDD) Target Area. She explained
that without the funding, this individual’s contract would be canceled and she would
not be eligible to purchase a home for at least 10 years. Mrs. Harvey advised
members that Ms. Tomeka Crawford, the housing counselor for this client, was
present to speak on this individual’s behalf.
Staff recommended allocating $20,000 in down payment assistance outside of the
DDD Target Area to a client experiencing a hardship.
Responding to Mr. Hutchison, Mrs. Ann Marie Townshend, Director of Planning and
Community Development, stated that the request had not been reviewed by the City
Manager.
In response to Mr. Hutchison, Mrs. Harvey stated that the request was supported by
staff.
Responding to Mr. Anderson, Mrs. Harvey stated that the home being purchased was
a townhouse located behind the Redner’s Warehouse Market on Route 8 in Dover,
and if this $20,000 allocation were approved, $40,000 in funding would remain in
the homeownership program for FY 2016. She stated that $60,000 had been
allocated for the entire year.
In response to Mr. Anderson regarding pending applications, Mrs. Harvey stated that
there was one (1) application pending for the downtown area.
Página 8
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 5
Mr. Caldwell questioned the reason for this special case outside the DDD area.
Responding, Mrs. Harvey stated that Ms. Crawford could better explain the hardship
of the client.
In response to Mr. Hosfelt’s request for clarification regarding the CDBG program,
Mrs. Harvey explained that CDBG funds are typically used City-wide, but because
of the City’s DDD designation, the Parks, Recreation, and Community Enhancement
Committee chose to allocate all of the funding for the City’s homeownership
program for the downtown area.
Mr. Hosfelt questioned if a request of this nature would be an unusual use for this
money if the property were located in the downtown area, and Mrs. Harvey indicated
that it would not be.
Mr. Hutchison requested Mr. Scott Koenig, City Manager, to comment on this item.
Responding, Mr. Koenig explained that it was a goal across the City to promote
homeownership in general. Although these CDBG funds were intended to focus on
the DDD as the target area, he had no objection to staff coming to Council to expand
beyond the DDD since this would go toward the overall goal of the City. Mr. Koenig
noted that he did not have the benefit of knowing the location of the subject property.
Ms. Tomeka Crawford, Homeownership Specialist, National Council on Agricultural
Life and Labor Research Fund, Inc. (NCALL), 363 Saulsbury Road, explained that
this client had approached her nearly a year ago wanting to purchase a home in
Dover. She indicated that her client works and lives in the City and would like to
remain in the City by using the City of Dover down payment and settlement
assistance program. Ms. Crawford stated that this individual had worked very hard
to become mortgage ready by selling a mobile home that was sub-standard and no
longer meeting her family’s needs, paying off debt, improving her credit score, and
saving money. At the point of becoming mortgage ready, the underwriting guidelines
changed, which made it impossible for the client to buy without using the City of
Dover program. If unable to use the $20,000 down payment and settlement
assistance program, this client would have to look at a much longer term of over 10
years to purchase a home. Ms. Crawford requested members to visualize having a
ready-to-move-in dream home and having that dream disappear all at once. She
stated that this is what would happen if this client were not approved for the CDBG
funds.
Ms. Crawford explained that she was present as a voice of the client who was not
present to represent herself. She advised members that she worked with this client
and saw the hardship, challenges, and the dream in front of her, noting that this
dream was almost to the point of disappearing. She requested approval for the client
to utilize the City of Dover program, which would allow her to move into the home
by September 15, 2015.
Página 9
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 6
Mr. Caldwell indicated that he was 100% in support of helping the client but
questioned if providing assistance for the purchase outside of the designated area
would set a precedent for the City in the future whenever someone has a hardship and
cannot buy a home. Responding, Mrs. Harvey reminded members that the
Committee had agreed to revisit the allocation of funds if all of the funds were not
expended in the target area by January 2016, and to determine then if funds would
be used City-wide. She noted that the City’s CDBG program was normally a
City-wide program and had not targeted the downtown area previously.
Mayor Christiansen reiterated that this program had always been a City-wide
program and was made site-specific when the City was designated as a DDD to
strengthen that program. He advised members that the City had partnered with
NCALL in revitalizing downtown Dover and the Restoring Central Dover initiative.
It was Mayor Christiansen’s belief that NCALL, a partner in good faith with the City,
would not have stepped forward and asked for this exception if they were not in
support of assisting this client in becoming a homeowner in Dover. He stated that
the opportunity to make someone a homeowner is a great opportunity for the City,
noting that this could be used as an advertisement for people considering moving to
the City. He stated that NCALL’s presence helps strengthen the City’s commitment
to restoring homeownership in the City.
Responding to Mr. Hosfelt as to whether the funds would be recouped by the City,
Mrs. Harvey explained that the funds would be a forgivable grant and the City would
only recoup these funds if the homeowner chooses to buy, sell, or rent the property
within 10 years.
In response to Mr. Anderson, Mrs. Harvey stated that if the recipient homeowner
buys, sells, or rents the property, they will be required to pay back a percentage of the
loan on a sliding scale, based on the type of loan and the length of the loan.
Mr. Anderson explained that the City’s homeownership program is funded out of the
CDBG program to help with the City’s goals related to low-income housing. He
stated that this is federal money and the City determines where it is spent within the
federal government’s guidelines.
Mrs. Crawford stated that she was committed to the downtown Dover initiative and
that she had another client who was in a position to purchase a home in the target
area and would be taking advantage of the funding available through the City’s
CDBG program as well.
Ms. Denise Freeman, Housing Counseling Director, NCALL, explained that NCALL
had long been a supporter of City of Dover initiatives and a huge supporter of the
City’s homeownership program. She stated that NCALL was fully committed to the
Restoring Central Dover initiative. Ms. Freeman explained that NCALL had
participated in many related events in Dover, including workshops with Central
Delaware Habitat for Humanity, Inc. She noted that events had been scheduled or
held at locations such as Bibleway Temple Church of God in Christ, Solid Rock
Página 10
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 7
Baptist Church, and Holy Trinity Church. Ms. Freeman stated that NCALL was also
fully committed to providing assistance to help families purchase homes, particularly
first-time home buyers. She explained that this particular client had remained
committed to becoming a home buyer. Ms. Freeman stated her pleasure that
Ms. Crawford was serving as housing counselor for this client, noting that
Ms. Crawford was passionate about wanting this family to succeed.
Responding to Mr. Anderson as to when the client entered the program,
Ms. Crawford explained that this occurred in June of 2014 and confirmed that the
criteria for the mortgage process had changed since that time.
Members were made aware that the loan officer working with the client had provided
a confidential letter outlining the client’s hardship.
The Committee recommended approval of staff’s recommendation to allocate
$20,000 in down payment assistance outside of the Downtown Development District
(DDD) Target Area to a client experiencing a hardship.
During the Council meeting, Mr. Anderson, Chair of the Parks, Recreation, and Community
Enhancement Committee, advised that the Committee recently recommended focusing the
Community Development Block Grant funds on the Downtown Development District where the first
priority would be for housing within the district. He noted that the Committee felt it would be better
to allow this exception rather than have the applicant lose their mortgage.
Mr. Lewis expressed concern that the grant money was specifically allocated for the Downtown
Development District targeted area and he felt it should be utilized for that. Responding,
Mr. Anderson stated that the Community Development Block Grant funds are actually available to
eligible residents citywide; however, the Committee wanted to ensure that the money was prioritized
so that most of it went into the Downtown Development District.
Mrs. Ann Marie Townsend, Director of Planning and Community Development, advised that,
because of the efforts with the Downtown Development District, the Parks, Recreation, and
Community Enhancement Committee recommended that the home ownership assistance focus on
the District. She noted that the recommendation was approved by City Council and was not a
requirement of any of the Department of Housing and Urban Development (HUD) rules.
Mrs. Townshend stated that, in this specific case, the purchaser of this home had been working with
the NCALL housing counselor for about a year, and her process started prior to the decision to focus
on the Downtown Development District. Although it would be ideal to spend all of the funds in the
downtown because they do need to increase home ownership in that area, this purchaser was caught
in the middle. Mrs. Townshend noted that the housing counselor who had been working with the
purchaser testified that if she was not able to get the down payment assistance, she would not be able
to go to settlement and would miss the opportunity for home ownership. She advised that this
purchaser started the home buying process well in advance of the City receiving the Downtown
Development District designation and City Council’s decision to prioritize the downtown area.
Página 11
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 8
Mr. Lewis asked if new homeowners living in his or other districts could apply for and receive a
$20,000 grant if they were experiencing a hardship. Responding, Mr. Hare stated that this applicant
applied and put their blood, sweat, and time into doing what they were told for seven (7), eight (8),
or nine (9) months and then the City changed their rules.
Mr. Hutchison stated that, based on the testimony regarding this applicant during the Committee
meeting, although the property is outside of the Downtown Development District he supported the
request because it fulfilled the requirements of the grant application process. He noted that any other
grant requests should be reviewed on a case-by-case basis.
Mr. Anderson noted that this program had historically been for the whole city; however, because an
incentive package was being developed for the Downtown Development District, the Committee
recommended prioritizing most of the money for the downtown area. He noted that 75% to 80% of
the money is still going to go into the Downtown District with the understanding that some of that
money would go into other parts of the City after the downtown applications were received and
evaluated.
Mr. Anderson reiterated that this applicant had gone through the process and was eligible for the
program; however, she was caught in the process when the rule changed. He noted that there was
a provision for an exception to be considered and it did not seem fair to disqualify this applicant
because of a rule change.
Responding to Mr. Lewis, Mr. Hare stated that if 20 people applied they would be considered in the
order they are received; however, the Downtown Development District rule would apply. If there
are enough funds for five (5) applicants and five (5) applicants in the Downtown Development
District applied, they would get first consideration. If there is only one (1) in the Downtown
Development District, then four (4) of the other 20 might qualify. Mr. Hare reiterated that the
Downtown Development District rule was not in place when this applicant applied and followed the
process.
Mr. Anderson stated that the federal grant leaves it to the municipality to prioritize where the funds
are spent.
Mrs. Townsend noted that NCALL, one of the lead partners in the downtown revitalization, provides
the housing counseling and is very aware of this situation. They will be building homes for home
ownership in the downtown, along with Habitat for Humanity, and as new clients come in, they are
focusing them in the downtown area if they are looking in Dover.
Mr. Anderson moved for approval of the Committee's recommendation to allocate $20,000 in
down payment assistance outside of the Downtown Development District (DDD) Target Area
to a client experiencing a hardship. The motion was seconded by Mr. Hare and carried by a
roll call vote of eight (8) yes and one (1) abstention (Lewis).
Recreation Needs Assessment
During the Parks, Recreation, and Community Enhancement Committee meeting
held on July 13, 2015, members considered the Draft Recreation Needs Assessment
Página 12
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 9
and recommended continued discussion of the Recreation Needs Assessment at their
next meeting. The Committee’s recommendation was approved by City Council
during their Regular Meeting of July 27, 2015.
Mrs. Ann Marie Townshend, Director of Planning and Community Development,
recommended that members take action on the Draft Recreation Needs Assessment,
noting that the assessment could be fine-tuned moving forward.
Mayor Christiansen requested clarification regarding the splash park concept.
Responding, Mrs. Townshend explained that, based on the information from the
public, staff would be looking toward locating splash pads at Silver Lake and Dover
Park. Based on the needs assessment, the City would move into doing master plans
for the parks, including the amenities. She stated that it had yet to be determined
which location would be first for a splash pad since this was not part of the
assessment.
Responding to Mayor Christiansen regarding the time frame for the opening of the
splash pads, Mrs. Townshend stated that, because of the desire for the City to deliver
more opportunities on the east side of the City, she felt that staff should move
forward with the master plan for Dover Park as the location for the first splash pad.
She indicated that this splash pad could not be constructed next fiscal year but
probably the year after.
Noting that the Capital School District had a new superintendent, Mayor Christiansen
questioned if it was expected that the City would be able to continue to use the
District’s two (2) facilities on the east side of the City. Responding, Mrs. Townshend
stated that the City uses the Capital School District’s facilities routinely, noting that
the City uses the field at the old Dover High School and runs an after school program
at Towne Point Elementary School. She stated that the District had been very
supportive in working with the City on other programming as well. Regarding
expanding the City’s programs to East Dover Elementary School to accommodate the
needs of youth on the east side of the City, Mrs. Townshend stated that this had not
yet been discussed but it was something she could look into.
Responding to Mr. Hutchison regarding working cooperatively with Kent County
Levy Court, Mrs. Townshend stated that the City was working with Kent County and
planned to meet with County staff to discuss recreation needs and working together.
Additionally, she indicated that the City works with the YMCA routinely, and that
this was increasing. Mrs. Townshend indicated that the YMCA was currently
conducting swim lessons for the City’s Camp Small Wonder and provides
transportation to and from their facility for these lessons.
The Committee recommended acceptance of the City of Dover Recreation Needs
Assessment.
Página 13
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 10
By consent agenda, Mr. Neil moved for approval of the Committee's recommendation,
seconded by Mr. Cole and carried by a unanimous roll call vote.
Mr. Anderson expressed his thought that strategic planning and goal setting goes
hand in hand with the Recreation Needs Assessment in that they are both plans to
improve various aspects of the City, revitalize the downtown, and improve recreation
opportunities. He asked for members of the Committee and the public to review the
information provided and offer suggestions and priorities regarding what needed to
be done. Mr. Anderson noted that some improvements would be easier than others,
such as adding trail stations at Schutte Park, and some would be more difficult and
more costly, such as a splash park. He pointed out the importance of determining
which park would have which amenities and noted that different funding proposals
must be considered. Mr. Anderson stated that there had been a proposal to change
the open space requirements and to also review the fee system dedicated to the
Parkland Reserve Fund, noting that there is no funding stream for capital
improvements in this area, and that most of the funding currently comes out of the
General Fund, with approximately $100,000 coming from fees.
Responding to Mr. Caldwell as to how the City’s recent tax increase would affect
park funding, Mr. Anderson stated his belief that this revenue would be applied to
public safety and infrastructure.
In response to Mr. Caldwell as to whether parks and recreation funding was being
received through grants, Mrs. Townshend explained that the City had utilized grant
funding through the Delaware State Parks from the Land and Water Conservation
Trust Fund; however, she indicated that there may be other opportunities for projects
that would help to improve public health. Mrs. Townshend stated that she recently
discussed looking for other grant opportunities with her staff.
Mr. Anderson stated that grants may be available for the expansion of trails and
updating of fitness stations.
Mrs. Townshend stated that a lot of the fitness classes offered at the YMCA and Club
Fitness use barbells, which the City’s programs are lacking, noting that they are
expensive to purchase. Some of the instructors that staff had spoken with indicated
they could offer a wider variety of classes if barbells could be incorporated into the
programming. Mrs. Townshend advised that staff was looking into researching grant
funds for these types of small projects, noting that last year Nemours donated $1,000
to purchase four (4) bicycle racks. She indicated that although grant funds may not
help with large projects such as splash pads and restrooms, there are probably
untapped funds for some projects.
Responding to Mr. Hosfelt, Mrs. Townshend advised that the fees collected for the
parks and recreation programs do not cover the cost of the programs and that fees
only account for about 20%, when considering only the Parks and Recreation budget.
When the Grounds Division, which maintains all of the parkland, is factored in, the
Página 14
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 11
revenue from recreation only pays for approximately 8% of the combined budget.
Mrs. Townshend confirmed Mr. Hosfelt’s understanding that the majority of the
needs assessment survey respondents felt that fees collected should help fund the
programs. She stated that most of the respondents indicated that there should be a
fee differential for residents versus non-residents, particularly some of the field and
pavilion rental fees which had not been adjusted in a number of years and were very
labor intensive for the Grounds Division. Mrs. Townshend stated that the softball
leagues that rent the fields are some of the larger money makers; however, the fees
collected do not cover the cost to maintain the grounds.
Responding to Mr. Hosfelt, Mrs. Townshend advised that league fees vary,
depending on the season, and noted that each team pays a fee. The softball
registration fee for the fall was approximately $500 per team, but can be as high as
$800. She noted that a current challenge was a decline in interest for softball and
there were fewer teams registering. Mrs. Townshend stated that Mr. Steve Pickering,
Sports Coordinator, had been working to expand leagues and the City had been doing
a lot more in regard to bringing in leagues for growing sports, such as field hockey
and lacrosse.
Mr. Anderson suggested ultimate frisbee as an option.
In response to Mayor Christiansen regarding State contributions, Mrs. Townshend
advised that the State contributes very little to the parks and recreation programs and
the only State funding the City receives is from grants, such as matching grants. For
example, having submitted a pre-application, the City recently received an invitation
to fill out a grant application for the Mallard Park improvements project, which
would cover approximately $33,000 of a $66,000 project.
Responding to Mayor Christiansen regarding utilizing Delaware State University’s
(DSU’s) School of Business to find grant money for other projects, Mrs. Townshend
indicated that this was something she could look into. She also stated that, in the
spring, the City always utilizes an intern from DSU who has to work 400 hours and
she could have this intern research grant funds.
At the request of Mayor Christiansen, Mrs. Townshend and Mr. Anderson agreed to
meet with the Mayor to discuss grant research and resources. Mayor Christiansen
noted that the DSU School of Business is a great untapped source of reference that
the City could use.
Mr. Anderson stated that he would also like to meet with the City’s counterparts at
Kent County.
Mr. Anderson posed questions to members regarding their thoughts on what areas
staff should be asked to look at first in relation to the needs assessment. He noted
that staff desired to look at building a new master plan for east Dover and to look at
Página 15
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 12
the expanded area in Schutte Park, which he felt were both important. Mr. Anderson
stated his desire for the Committee to come back to this issue, noting he would like
more of the Committee members to be present to discuss this.
Strategic Planning and Goal Setting (Restoring Central Dover Strategic Plan)
Referring to the Executive Summary of the Restoring Central Dover - Our Vision for
Vitality plan, Mr. Anderson questioned if members had any particular points to
discuss in the plan or areas to prioritize, such as housing, community economic
development, recreation, or youth programs.
Mr. Hosfelt stated that he would like to hear from Mr. Joe Myer, Chair, Restoring
Central Dover Steering Committee, and staff, and expressed a desire to meet with
this committee. Mr. Hosfelt stated that he was one (1) of the original members of the
steering committee years ago when the process started. Noting that many things had
occurred since that time, he felt it would be important for Council as a whole to get
an overview of how it started and where things stood currently in order to determine
a direction for the future. Mr. Hosfelt indicated that the Restoring Central Dover
Steering Committee was the driving force behind this effort.
Noting that the Restoring Central Dover Steering Committee had grant funds but no
legislative authority, Mr. Anderson expressed his opinion that they needed the Parks,
Recreation, and Community Enhancement Committee in this regard. He felt that
working together, great things could be accomplished. Mr. Anderson stated that
members of the Restoring Central Dover Steering Committee had reached out to
members of the Parks, Recreation, and Community Enhancement Committee, and
suggested issuing an invitation to the Restoring Central Dover Steering Committee
to meet with the Parks, Recreation, and Community Enhancement Committee.
The Committee recommended issuing an invitation to the members of the Restoring
Central Dover Steering Committee to meet with the Parks, Recreation, and
Community Enhancement Committee.
By consent agenda, Mr. Neil moved for approval of the Committee's recommendation,
seconded by Mr. Cole and carried by a unanimous roll call vote.
The Committee deferred this item for further discussion during the
September 14, 2015 Parks, Recreation, and Community Enhancement Meeting.
By consent agenda, Mr. Neil moved for approval of the Committee's recommendation,
seconded by Mr. Cole and carried by a unanimous roll call vote.
Mayor Christiansen advised members that Mrs. Horsey was on the way to recovery
and should be able to attend the next meeting.
The Committee recommended sending official speedy recovery and get well wishes
to Mrs. Horsey from the Committee.
Página 16
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 13
By consent agenda, Mr. Neil moved for approval of the Committee's recommendation,
seconded by Mr. Cole and carried by a unanimous roll call vote.
Mr. Anderson moved for acceptance of the Parks, Recreation, and Community Enhancement
Committee Report, seconded by Mr. Hare and carried by a unanimous roll call vote.
UTILITY COMMITTEE REPORT - AUGUST 10, 2015
The Utility Committee met on August 10, 2015 with Chairman Hutchison presiding.
Annual Review and Approval of Governing Policy for Energy Commodity Risk
Management
Members were advised that the City of Dover has in place an approved risk
management policy associated with the purchase of energy commodity and related
investment contracts. The purpose of the energy commodity and investment
contracts resulting from the application of the risk management policy is: (i) to secure
economic and reliable energy supply to meet the ongoing energy requirements of the
City and its citizens, and (ii) to provide price certainty for those end users purchasing
electricity supply from the City.
Mr. Scott Koenig, City Manager, stated that City management, along with The
Energy Authority (TEA) and their client manager, completed their annual review of
the Energy Commodity Risk Management Policy, and he reviewed the changes
recommended for the Utility Committee and City Council acceptance. He indicated
that the revisions were maintenance changes recommended by both TEA and staff
to clarify issues, streamline the process, or remove language that was outdated
because of the changing markets.
Staff recommended acceptance of the revised Governing Policy for Energy
Commodity Risk Management.
Referring to Page 13 - Risk Limits and Risk Measurements, A. Limits, Item #1,
Volume/ Maturity/Value Limits, Mr. Blakeman noted the inclusion of Fuel Oil #6 in
the chart. He questioned if the City was still buying #6 oil and was permitted to burn
it. Responding, Mrs. Donna Mitchell, Controller/Treasurer, stated that the City was
no longer buying #6 fuel oil.
Mr. Koenig stated his belief that the City was not permitted to burn this type of oil
and that this could be removed from the policy. Mr. Blakeman supported removing
it, feeling that it was misleading.
With reference to Item #2, Delegation Authority, on Page 13, Mr. Blakeman noted
the statement that “The ERMC may delegate these authorities to individuals
authorized to commit Dover to financial obligations.” He questioned if there was a
list of these authorized individuals. Responding, Mr. Koenig stated his belief that the
positions that are able to commit to those transactions were specified on Page 8 -
Management and Controls, B. Executive Risk Management Committee (ERMC),
Página 17
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 14
which defines the roles of the members of the ERMC. He noted that the members
of the ERMC include the City Manager, Director of the Utility, and Controller, and
between these three (3) individuals, the City has the authority to make those
transactions.
Mr. Blakeman questioned if the “individuals authorized to commit Dover to financial
obligations” referred to the members of the ERMC committee. In response,
Mr. Koenig stated that TEA can perform a small range of transactions themselves.
Mr. Blakeman questioned if these transactions would be performed by an employee
of TEA. Responding, Mrs. Mitchell stated that TEA’s current service manager is one
of the members of the ERMC and this individual would instruct their employees to
do hedging. She confirmed that the Utility Committee would authorize the City’s
members of the ERMC Committee to authorize TEA to act.
Mr. Blakeman indicated that it might be helpful if someone at TEA was listed so that
it would be known who this was going to be. Mrs. Mitchell explained that position
titles rather than the names of ERMC members were included in the policy to avoid
the need to revise the document when there are staff changes. Mr. Blakeman noted
that the statement referenced only “individuals authorized.” He did not feel that
individuals needed to be specified but thought that the term “other authorized
individuals” was vague.
Mr. Koenig expressed his belief that delegation would also be covered by TEA’s
insurance, etc. TEA would not delegate this responsibility to an unqualified person
since TEA would be as responsible as the City.
With reference to Item #3, Volume Limits on Page 13, Mr. Blakeman referred to the
statement that “For no reason should a transaction be executed that exceeds the City’s
electric load requirements” and questioned if this referred to exceeding the limits on
an hourly, daily, or monthly basis and if there was a time frame attached to
exceeding. In response, Mr. Koenig stated his belief that the excess would be based
on the purchase. If the City were purchasing load to 80% for the current year, this
may involve day-ahead transactions, which the City sometimes makes. He stated that
it would be either the cumulative load profile for the year or the daily expected load
profile, noting that there are many kinds of transactions that happen. Mr. Koenig
indicated that it could be a daily, monthly, or annual time frame.
Mrs. Mitchell stated that this would be based on TEA monitoring the City’s load and
needs, noting that TEA is not supposed to exceed this. She concurred with
Mr. Koenig that this is based on the percentage that is hedged versus what the City
buys in the open market. Mrs. Mitchell advised members that the City does not
hedge 100% in case the load for the month does not come in at 100% and that
volumes are measured.
Página 18
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 15
Mr. Blakeman questioned, if 80% of the load were hedged, whether this percentage
could not be exceeded. Responding, Mrs. Mitchell stated that TEA can buy what
they need on the market based on the load but cannot exceed 100%.
Mr. Koenig stated that the hedge target for FY 16, which began on July 1, 2015, was
80% in the month of July. The City was still carrying 20% of the load as short-term
purchases and trying to take advantage of the market. In FY 17, a target of 60% of
the estimated load was set. He explained that the City is under 100% on a rolling
basis moving through the year. When starting each year, the City would not be over
80% of the projected load.
Mr. Blakeman suggested, perhaps not this year but next year, that the language be
clarified as he felt it was vague.
Noting that the policy references the City of Dover hedge program, Ms. Stewart
questioned if there was a hedge program document available for her review as a new
member of the Committee. Responding, Mr. Koenig stated that staff would bring
this document forward.
The Committee recommended acceptance of the revised Governing Policy for Energy
Commodity Risk Management.
By consent agenda, Mr. Neil moved for approval of the Committee's recommendation,
seconded by Mr. Cole and carried by a unanimous roll call vote.
Quarterly Review of Utility Related Capital Investment Plan (CIP) (Electric and
Water/ Wastewater) (April, May, and June) (Pre-Audit)
Mr. Scott Koenig, City Manager, reviewed the preliminary Capital Investment Plan
Project Tracking Quarterly Report as of June 30, 2015. He advised members that
staff in the Public Works Department, the Electric Department, and in some other
departments with respect to vehicle purchases, had been working diligently to finish
a backlog of projects that had accumulated over several years. Mr. Koenig expressed
his pleasure that a number of the projects listed in the report that had been in progress
for some time had been completed. He noted that some projects, such as stormwater
utility planning, were multi-year projects and were expected to extend beyond one
(1) year.
Mr. Koenig indicated that staff had worked hard to complete the Garrison Oak
Technical Park (GOTP) improvement projects, which were expected to be completed
in FY 16 and a backlog of individual street paving and utility-related projects that
had been lagging behind had been caught up. Mr. Koenig stated that a number of
projects were under construction throughout the City, and several street program and
community transportation projects under the General Fund had closed out. He
advised members that some projects still lingered, such as the Lincoln Park Center,
as well as some small unused funds in some individual Community Transportation
Fund locations.
Página 19
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 16
In regard to the water and sewer utility, Mr. Koenig stated that staff had been
working on finalizing a site for an elevated storage tank at the north end of the City
and was very close to securing that site. He advised that this project was considered
by the Planning Commission and there were some objections regarding the site
location. Staff believed that a new site had been worked out and this project would
be brought forward in the next few months. Mr. Koenig informed members that the
GOTP water system improvements were complete and the sanitary sewer system
improvements were very near completion. He advised that the elevated storage tank
had lagged behind slightly, but the top of the tower was now on. Mr. Koenig stated
that the welds on the bowl of the tower would be finalized and the project would be
moved to completion this fall, which would help finalize all of the Garrison Oak
projects. He indicated that the curb line had been poured in the back section.
Mr. Koenig indicated that a new deep well at Schutte Park had been completed and
back-up generators had been put into place. He advised that there had been several
Inflow and Infiltration (I&I) projects that were completed throughout the system.
Mr. Koenig stated that, in general, staff had caught up or was making good progress
on catching projects up and getting into current year money, versus funds that had
lagged behind for a while.
With reference to the Electric Department, Mr. Koenig stated that improvements to
the Horsepond Substation were completed in FY 15 and Staff had been working on
a system upgrade related to the new Energizer location. He indicated that the
General Scott Substation project was now underway and he reiterated that staff was
making significant progress in getting into the current year's money and projects,
which had fallen behind. Mr. Koenig advised that the Electric Department completed
the relocation of the 69 KV line, and staff was awaiting base paving and some
additional moves from Verizon and Comcast to finish up that work.
In response to Mr. Hutchison regarding the time frame required to complete the water
tower north of the City, Mr. Koenig estimated that it would take approximately one
(1) year to construct.
Mr. Hutchison questioned how the City’s long-term system appeared based on the
current increased demand for water at Calpine. Responding, Mr. Koenig advised
members that Calpine block one (1) had been in operation all summer and the City
had managed the demand of Calpine and the rest of the system with the existing well
system and elevated storage tanks. He noted that there had been significant volume
changes in the tanks. To Mr. Koenig’s knowledge, no complaints about pressure had
been received across the City, which was good news. The additional tank at the
Garrison Farm would take the City from about 3.75M gallons of elevated storage to
5.25M gallons, since the tank would hold 1.5M gallons. This would take care of all
demand related to the future build-out of the GOTP. Mr. Koenig advised that the
additional 1.0M gallons being discussed on the north end of the City would increase
storage to 6.25M gallons. He explained that the purpose of the additional elevated
storage was to allow for water supply for a fire in a worse case scenario. Mr. Koenig
Página 20
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 17
stated that, from an everyday operating standpoint, the system would be over-built;
however, the towers are built to allow for response to an instantaneous emergency or
severe fire demand at the worst possible time during a hot summer. He advised
members that after going through all the engineering calculations and building the
systems to all of those variables, the end result is pretty significant additional
elevated storage, and he anticipated that those features would be in place by the end
of 2016.
Mr. Koenig stated that if block two (2) of Calpine were built, a need for elevated
storage was not anticipated; however, additional drilling for water resources was
anticipated. He noted that money was set aside in FY 16 to try and identify the
location of that next well resource, and staff would be meeting with the Department
of Natural Resources and Environmental Control (DNREC) shortly to discuss how
to proceed from a regulatory standpoint, and then hopefully begin an investigation
in design and construction over the next few years. Mr. Koenig indicated that the
system had generally performed very well this summer, even when there were days
with high heat during the week. He noted that his office had not received the number
of complaints that he felt might occur when the full load at Calpine was turned on.
Mr. Koenig stated that the water treatment plant on Long Point Road was acting as
the buffer to supply water to the energy block. He noted that there had been
significant demands on the system without negative repercussions, noting that
Calpine, the City’s power plant, and NRG Energy, Inc., had all been running at times.
Mr. Koenig noted that there was a lot of water moving through the system currently,
but this was good for the City for a number of reasons.
In response to Mr. Blakeman regarding the fact that the new well was a shallow well
as opposed to a deep well, Mr. Koenig stated that the deep Piney Point well at
Schutte Park was the newest well constructed as a replacement of a former Piney
Point well. The allocation was moved from one (1) point of the system to another
point and the well was drilled at basically the same depth.
Mr. Blakeman expressed his understanding that the City could not receive any more
allocation for deep aquifer water. Responding, Mr. Koenig stated that the challenge
was that the State wants the City to discontinue drilling in the Piney Point aquifer.
Wells can be replaced, but they did not want to authorize significant new allocations.
He advised that the State does not want to authorize additional allocations in the
Cheswold aquifer because of the same issue, potential mining of the aquifer.
Mr. Koenig explained that the concern about pumping from the Colombia aquifer,
which is the unconfined aquifer out near Long Point Road, was that pumping that
aquifer causes the potential intrusion of salt water, which would not be desired. He
stated that when looking for the next well, the City may be in the Frederica aquifer,
which is much deeper than the Piney Point well at about 250 to 300 feet. Mr. Koenig
noted that there are many decisions to be made from a technical and administrative
level before determining the next well. Staff had tried to develop the
interconnections with Tidewater Utilities and other systems for drought protection
and for the entire discussion about how to manage the resource. Mr. Koenig
Página 21
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 18
explained that the State was now requiring farmers to obtain allocation permits, and
that the table is heavily weighed in the agriculturalists’ favor. He indicated that
agriculturalists’ demands for hundreds of thousands of gallons are typically granted;
however, if the City makes similar requests, they typically begin a negotiating
process begins. Mr. Koenig noted that the State may grant a portion of the request,
but then asks the City to take a portion of the allocation from other areas. In the past
two (2) years, if the City had allocation permits that permitted production at 500
gallons per minute but production had been 450 gallons for the last 10 years, the
State had requested that the permit be reduced to 450 gallons, stating that they would
grant the extra gallons elsewhere. Mr. Koenig indicated that the State is very
stringent with the overall umbrella of the system.
Mr. Koenig stated that there are approximately 22 wells in the entire system. If the
City requested another permit or another well, adding a 23rd well would not mean that
the State would take the City’s limit from 10 Million Gallons per Day (MGD) to 11
MGD; they may leave it at 10 MGD and just approve another well. He indicated that
many discussions were going on internally to determine how to manage this resource.
Mr. Koenig advised that drinking water is a valuable resource and noted that the State
recognizes its value. He stated that the City of Dover is in the State growth zone,
and, at the policy level, the State wants development to happen in a way that they
term “on system.” Policies in years past have favored pushing developments and
economic development to the municipalities, but this requires the appropriate
allocations for water and sewer. Mr. Koenig indicated that it was somewhat of a
moving target at the State to get all of those things to match up.
Mr. Blakeman noted that there were 31 projects listed in the report in progress and
questioned the likelihood of them being carried over to the next budget year.
Responding, Mr. Koenig advised members that some were intended to be multi-year
projects. He noted that Self-Contained Breathing Apparatus (SCBA) was ordered for
the Fire Department which did not come in by June 30, 2015; therefore, this had to
be carried over as a project in progress, and there was a handful of other projects that
remained for similar reasons. He noted that some projects were simply behind and
the City was not on target with every single project.
Mr. Blakeman stated that staff had done a good job cutting down on the backlog and
expressed a desire that projects would not build back up again.
Mr. Koenig stated that funds for projects in the I & I funds do not dry up on June 30th,
noting that these projects have to be rebudgeted, but funds are present.
Mr. Anderson thanked Mr. Koenig for good progress at Woodcrest Drive and Buttner
Street, noting that constituents from these areas had contacted him with a very
favorable review and he had not observed or heard about any flooding problems
recently there. Mr. Anderson stated that he was glad to see some of I & I projects
moving forward because the infiltration costs the City a lot of money, and the more
that can be done, the better.
Página 22
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 19
Mr. Anderson questioned whether Mr. Koenig was concerned that funds for some of
the projects must be spent because of the possibility of the State trying to recapture
unspent funds next year, noting that the State had tried to do this in 2008/2009.
Responding, Mr. Koenig stated that his concern was with regard to State funding
related to the street program. With the budget increases in FY 16, Council brought
the City street program up to $1M. He felt it was important for the City to keep the
community transportation projects tight administratively, in terms of getting them
authorized, completed, and reimbursed. Mr. Koenig explained that the State
legislature had indicated that Community Transportation Funds may be significantly
cut next year, and this would affect the City’s ability to do some specially requested
street projects. He noted an additional concern that if Municipal Street Aid were cut,
the City would have to tailor back the street program from $1M to make up for some
of this funding. Mr. Koenig indicated that this was not a concern for the FY16
budget but was a concern for FY 17. He indicated that if there were State revenue
cuts to local governments, the City would be looking at capital project cuts and
potentially operational cuts.
Mr. Anderson indicated that he had heard talk about some devolution to local
governments but no talk about money going with that. In response, Mr. Koenig
stated his thought that this would be debated significantly over the next year. He
indicated his hope that if revenues do go away, that this would occur on a horizon
that the City can plan for rather than immediately, since the immediate pullback of
those revenues would cause the City to reconsider some of the capital projects.
Responding to Mr. Anderson regarding the reason for the delay on the Lincoln Park
project, Mr. Koenig indicated that the money afforded for this project was related to
design. He explained that there was a conceptual design for the project; however,
one (1) of the reasons that the project had not progressed was because of the fairly
significant construction cost and because no one had yet been identified who was
interested in building in that area. Mr. Koenig stated that if a private developer was
willing to take on some of this project, they may elect to construct the road or
improvements privately, and they would not be under wage rate requirements. He
advised members that a public-private partnership to build out the concept would
likely not require the City to borrow money to go forward to construction.
Mr. Koenig explained that the grant that the City received was for design and
planning. In regard to the potential purchase of property, he felt the federal
guidelines would become another obstacle that must be managed, since construction
as a federal project would require a different set of rules than those for a private
developer or if the City were to take on the land acquisition for it. Mr. Koenig stated
that if the project was done through a grant, there are special rules for land
acquisition, business relocation, and home relocation, and it would become a very
burdensome project to undertake. Assistance would be needed from the Delaware
Department of Transportation (DelDOT), including their expertise in land
acquisition, to move it forward as a joint federal, state, and local government project.
Because of the uncertainty about what would be done with this area, staff had not
asked for construction money at this point.
Página 23
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 20
Mr. Anderson questioned how the new prevailing wage structure would benefit the
City. Responding, Mr. Koenig advised members that the State relaxed some of the
prevailing wage guidelines for public works projects related to Community
Transportation Funds, and staff was waiting for written guidance. His understanding
was that there was a new threshold at the State level for the kicking in of the State
prevailing wage for community transportation. Mr. Koenig stated his belief that the
threshold was approximately $250,000, noting that he needed to confirm this figure.
He explained that a City road project valued at $100,000 funded solely with
community transportation funds would be below the threshold. Mr. Koenig noted
that this would help with projects such as the Inner City Cultural League, the Solid
Rock Church, and some individual road projects, since the prevailing wage would not
be required under the new rules, which would result in potential savings.
The Committee recommended acceptance of the report as presented.
By consent agenda, Mr. Neil moved for approval of the Committee's recommendation,
seconded by Mr. Cole and carried by a unanimous roll call vote.
TEA/NAES Report (June)
The TEA/NAES Monthly Report for June 2015 was provided to members to enable
them to monitor electric sales and revenues received, which will provide a better
understanding of any fluctuations that occur and allow the opportunity to make
improvements if deemed necessary.
Mr. Scott Koenig, City Manager, noted that the monthly reports received in the 11th
and 12th months of the year are the most important. He felt that the City had a pretty
good year overall regarding its power supply and hedging program efforts. Referring
to Page 13 of the report, he noted that year-to-date information, which reflects the
12-month period, indicated a budgeted gross load of 744,332 MW and the actual was
757,247 MW; therefore, the City sold more energy than staff was preparing in the
budget. Mr. Koenig noted that the Total - Utilities Cost reflected that the City had
budgeted $49.4M and actually spent $47.8M. The City’s load was higher than
anticipated and the City came in under budget in power supply by about $1.5M. He
reminded members that several years ago the City realized a multi-million dollar
savings in this area because the City’s hedges were coming off and the City was able
to buy power at a lower cost. There was a similar condition moving through this
year, but there were some months that tended to fluctuate. Mr. Koenig noted that
extreme cold weather during the winters of 2014 and 2015 resulted in some major
swings in costs, and the City was able to overcome that over the 12-month period.
He reminded members that the energy market is extremely dynamic, changing
almost daily, which creates challenges in projecting for the future. Mr. Koenig
advised members that hiring Mr. Harry Maloney, Electric Director, had provided
additional perspective. He stated that Mrs. Donna Mitchell, Controller/ Treasurer,
had been involved with this contract from the beginning and previously in the
transition from PACE to TEA as the City’s energy management provider.
Página 24
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 21
Mr. Koenig reiterated that he was happy where the year ended up, noting that staff
expected that things would tighten up over the 12-month period, and they had, but
the City had been faring reasonably well.
Responding to Mr. Hutchison as to how far out the City buys into the market,
Mr. Koenig stated that the City was buying no more than five (5) years out and makes
declining purchases over a five (5) year period. He stated that the City was just
starting to purchase products for five (5) budget years out, which presents challenges
in projecting the future.
In response to Mr. Hutchison, Mr. Koenig confirmed that when buying five (5) years
out, the City is generally locked in. He noted that there may be a unique opportunity
to sell and a deal is not finalized until the date is attained; however, the City is, for
the most part, locked in when committing to these purchases.
Mr. Blakeman commented that if the City wanted to sell undesirable power, others
would probably also find it undesirable.
Referring to the $1.9M total listed for hedge transactions in the Executive Summary
on Page 2 of the report, Mr. Blakeman questioned if these funds were paid in the
PJM bill or paid separately as a check to another party. In response, Mrs. Mitchell
explained that hedges are paid separately to somebody else. The City has
counterparties, such as Constellation, Macquarie, and BP, and the City pays
whomever it has the hedges with for the month. She indicated that TEA makes sure
that everything matches up and forwards the invoices to the City for payment.
Mr. Blakeman stated that he was having difficulty reconciling the purchase and cost
information in the report, indicating that the Executive Summary on Page 2 listed a
$1.8M purchase and energy charges of $898,169.44; however, the PJM bill for July
was approximately $775,000, which was the amount that the City sent to PJM. He
noted that the $1.8M purchase and $898,619.44 in energy charges were substantially
higher than the $775,000 amount.
In response, Mrs. Mitchell explained that the PJM bill reflects both sales and
purchase transactions. When PJM is paid, the City pays them the net of the credits
and the debits on the bill. The net at the end of the year should be the total of all the
weeks’ bills, which is the final bill for the month. She indicated that on a weekly
basis, it may go one way or another, reflecting a payment in week one (1) and a credit
in week two (2). In the final week of the month, PJM provides a total bill that trues
up all transactions, and the net of all debits and credits is what the City pays.
Mr. Blakeman reiterated the problem that a total of approximately $1,866,000 was
reflected in purchases and fees from PJM, but the bill came to $775,000.
Responding, Mrs. Mitchell stated that the credits that the City receives for its load
reduces what the City pays PJM.
Página 25
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 22
Mr. Blakeman stated that he would like to see an explanatory reference if the City is
paying substantially less, because he was not able to reconcile the report with the bill.
After additional discussion, Mrs. Mitchell referred to page 11 of the TEA report. She
explained that the items included in Power Supply at the top of the report, such as the
PJM - Energy, Congestion, and Losses and PJM - ARR, Transmission and Fees, and
PJM - Capacity UCAP Obligated Purchased, reflected the purchases from PJM, such
as the $1.8M total referenced previously. Mrs. Mitchell stated that the Power
Generation Non-Production Revenue listed near the bottom of Page 11, listed on this
spreadsheet as totaling approximately $930,666, reflected the net amount billed, such
as the $775,000 mentioned previously. She explained that the $1.8M in the
Executive Summary was based on the power supply in the top section and is not
netting against the capacity credit.
Mr. Blakeman indicated that this was his concern since the larger number was being
used to calculate the cost of kWh or MWh of power, and if only an amount in the
neighborhood of $775,000 was being paid, the cost per MWh should be lower than
using the $1.8M.
Mrs. Mitchell stated that, as presented on page 11, the power supply MWh cost is
netted against the credit for power supply generation to offset the City’s credit,
providing the net MWh cost, which is the true cost.
Mr. Blakeman suggested that lower number would be a better number to put in the
Executive Summary, as opposed to using the $1.8M as a calculation, to show the
actual cost per MWh of purchasing power.
Mrs. Mitchell explained that this is the power supply piece and stated the need to
look at the terminology used by TEA. The generation credit is the City’s production
credit piece. TEA provides amounts for the power supply, the generation credit, and
the net cost for the month.
Mr. Blakeman stated his belief that the City was actually paying $775,000, not
$1.8M, and if the kWh’s from this report were divided to show the cost per kWh or
MWh, a higher cost would be reflected than if the net number were used. His
concern was that the City was reflecting a higher cost per kWh or MWh than if the
$775,000 number, which he felt was the real number, were used.
Mr. Blakeman felt that this was something that should be looked at.
The Committee recommended acceptance of the report as presented.
By consent agenda, Mr. Neil moved for approval of the Committee's recommendation,
seconded by Mr. Cole and carried by a unanimous roll call vote.
Página 26
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 23
Updates
Green Energy Funding and Programming
Members reviewed details regarding Green Energy Funding and Programming.
National Pollution Discharge Elimination System (NPDES) Municipal Separate
Storm Sewer Systems (MS4) Permit
No update was provided.
Garrison Oak Technical Park Project Updates
Mr. Scott Koenig, City Manager, provided the following updates:
City Infrastructure/Calpine Energy Center
From a utility standpoint, projects at the Garrison Oak Technology Park (GOTP)
would be coming to an end over the next couple of months and a final cost would be
determined and reported to Council. Mr. Koenig expressed his belief that these
projects were right about at budget; however, the electric relocation was about
$50,000 under budget. He indicated that the City was beginning to see a return on
its investments. The Calpine facility was occupied and producing energy out of
block one, and Calpine was a large water user and fairly large sewer customer. It was
Mr. Koenig’s belief that the Uzin Utz facility had received its temporary certificate
of occupancy and was beginning to ramp up for a full operation shortly. He expected
that these facilities would have opening dedications in September and October and
staff was continuing to market the balance of the park, having committed to a sale for
one (1) parcel in addition to the Uzin Utz and Calpine facilities. Mr. Koenig advised
members that there was additional activity in the GOTP for those interested in
relocating or building new businesses there and that staff was very happy with the
GOTP’s standing in this regard.
Mr. Koenig stated that infrastructure comes to a close, the FY 15 and FY 16 total
City budgets were close in numbers. He noted that the operating budget was
becoming more expensive and the capital budget decreased slightly as the City was
progressing through a spike in cost associated with the development of the GOTP.
In regard to the budget, Mr. Anderson questioned if the surplus would go toward the
power supply, to pay back funds, or to the reserve. Responding, Mr. Koenig stated
his belief that funds saved through the purchase of energy would go into the Rate
Stabilization Fund, rather than the operating budget, to help with potential future
increases or levelization of future power costs or power cost adjustments.
In response to Mr. Anderson, Mrs. Mitchell confirmed that these funds were not
accounted for in the budget that was just passed by Council.
Dover Sun Park
Mr. Scott Koenig, City Manager, reviewed a spreadsheet entitled “City of Dover
Electric Revenue Fund - FY 15 - White Oak Solar Park Incremental Cost.” He
advised members that numbers were provided through June 2015, and the
incremental cost of the solar park to the City’s ratepayers was approximately
Página 27
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 24
$909,000 for the year. Mr. Koenig stated that the City pays a premium for solar
energy; however, it is required to diversify the City’s portfolio. He advised members
that the challenge was how to make this work for the City in the long run.
Mr. Koenig noted that there had been some instances during months with extreme
temperatures when power coming off the solar park was cheaper on a monthly basis
than what was being bought off the grid, which he had not expected. He advised
members that the reality was, moving forward, that the City would have to invest
more in solar and other renewable energy projects to comply with Renewable
Portfolio Standards (RPS) standards and to diversify its portfolio. He noted that
these costs would be higher, but this must be done to maintain the utility.
The Committee recommended acceptance of the updates as presented.
By consent agenda, Mr. Neil moved for approval of the Committee's recommendation,
seconded by Mr. Cole and carried by a unanimous roll call vote.
By consent agenda, Mr. Neil moved for acceptance of the Utility Committee Report, seconded
by Mr. Cole and carried by a unanimous roll call vote.
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE REPORT -
AUGUST 10, 2015
The Legislative, Finance, and Administration Committee met on August 10, 2015 with
Chairman Hare presiding.
African American Business and Workforce Inclusion Report (Economic
Inclusion Study) by Delaware State University Center for Economic
Development and Trade (Dr. Michael Casson)
During their Regular Meeting of November 25, 2013, City Council considered a
request from Mr. Clayton Hammond II, Delmarva Black Chamber of Commerce
Chairman, for funding for the Delaware State University Center for Economic
Development and Trade to conduct an economic inclusion study for the City of
Dover. City Council approved the request to fund the Economic Inclusion Study in
the amount of $6,000, as recommended by the Legislative, Finance, and
Administration Committee.
Dr. Michael Casson, Director, University Center for Economic Development and
Trade (UCEDIT), reviewed a presentation of the African American Business and
Workforce Inclusion Report for the City of Dover, Delaware.
Dr. Casson thanked leadership for commissioning the study. He explained that
Mr. Bill Neaton, Economic Development Manager, and the City’s Economic
Development Office staff were instrumental in moving this process forward and
showing leadership pertaining to the engagement of the African-American population
in the City of Dover.
Página 28
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 25
In terms of the importance of an inclusion study, Dr. Casson stated that at this time
last year a need was laid out to address the African-American community so that this
community could be seen to grow economically, socially, and professionally. He
stated that the intent was not to exclude any other populations within the City, but to
look particularly at potential areas of growth in business and workforce development
in the African-American community. Dr. Casson noted that when all populations
progress at their optimal level, there is economic growth, cities become more
competitive, and there can be movement forward as a city.
Dr. Casson explained that the basis for the study was a questionnaire that was
presented to the City’s Economic Development Office, and he reviewed some of the
questions included. He indicated that the questionnaire looked at resources
pertaining not only to African-Americans but to the total population, noting that the
African-American population is a part of the total population. Dr. Casson stated his
understanding that no exclusionary practices were happening; however, he expressed
the desire to see what mechanisms may trigger more participation among the
African-American community as opposed to other populations.
Dr. Casson reviewed statistics reflected under Dover’s African American Population
at a Glance.
Dr. Casson stated that Data Driven Decision Making (DDDM) should be used as a
basis to ensure effectiveness across programs, services, and resources. He noted the
importance of collecting sound data and utilizing that data to make informed
decisions. Dr. Casson stated that it was important to make sure that the initiatives,
practices, and actions put forth are optimizing resources and funds when there are
budget constraints.
Dr. Casson reviewed the steps of the DDDM “Cycle of Inquiry,” emphasizing that
this was a dynamic process and adjustments would be made based on the information
collected during that process. He indicated that starting to think about how to
effectively collect this data for the African-American community would be the
number one (1) priority.
Dr. Casson stated that commissioning the economic inclusion study was a very
important first step in this process, and the next important step would be an inclusion
plan. This plan would take some of the points from the inclusion study, bring
together the stakeholders, and begin to create strategies around engaging the
African-American community.
In reviewing the recommendations from the study, Dr. Casson indicated that the chief
recommendation was the need for a comprehensive inclusion plan. This would entail
pulling together a steering committee of stakeholders to delve deeper into the
African-American small business community and the workforce community,
determine what the needs are, and begin to devise action items around those needs.
Página 29
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 26
He emphasized the need to employ DDDM to ensure that the strategic plan and the
action items that come forth from the inclusion plan actually reach the target
population.
In response to Mr. Anderson, Dr. Casson explained that the unemployment statistics
included in the report were Bureau of Labor Statistics (BLS) projections, indicating
that they were five (5) year projections based on the 2000 census. He stated his belief
that the information was from the American Community Survey.
Mr. Anderson noted the 16% unemployment rate for African Americans as a
percentage of the total labor force and stated that the Hispanic population had
approximately doubled in the last five (5) years.
Dr. Casson stated that the Hispanic population had grown by 9%. He indicated that
the African American population had increased by approximately 3% to 4%, and the
white population had decreased by 11%.
Responding to Mr. Anderson, Dr. Casson confirmed that these were not absolute
numbers but a percentage of City population.
Mr. Anderson noted that African American businesses accounted for approximately
8.7% of the businesses in the State. He stated that African Americans represented
approximately 40% of the City’s population but only 12.7% of the businesses.
Noting that he would have expected the business figure to be around 20% as a
percentage of population, Mr. Anderson inquired what Dr. Casson would attribute
this disparity to.
Responding, Dr. Casson stated his belief that this was due to the processes and
protocols in place for African-American small businesses to engage resources and
services for development. He felt that this might be an area for growth, noting that
if these resources and services were present and were not being utilized for some
reason, perhaps the proper communication channel was not being used. Dr. Casson
noted that the City was above the State average in African American businesses, but
there was still a disparity based on population. Noting that there was a propensity or
taste among the African-American population for entrepreneurship, Dr. Casson stated
the question was how to determine what processes were in place to ensure this. For
example, Dr. Casson questioned how the City’s Economic Development Office could
oversee data collection or track movement as it pertains to African Americans who
are interested in the development of small businesses. If this movement could be
tracked, these potential business persons could be directed toward more optimal
paths. Dr. Casson indicated that sometimes a path may be followed that leads to
stagnation, and from there a business never grows or develops.
Mr. Anderson questioned if being more focused in getting the message out would
help the general population as well. He noted that the purpose was not to direct
government money to any particular group, but to make sure that the whole
population is served and that Dover is growing as a City.
Página 30
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 27
In response, Dr. Casson confirmed that it was important to ask what was being done
for the general population as a whole. He indicated that if this question were
answered, it would be possible to understand if there was information flow, if
services were available, and if these services were reaching the general population,
and then to find out why the African-American population was not getting this
information. Dr. Casson stated, from a general perspective and through DDDM, it
could be said, for example, that there was a program for business technical assistance
and the African-American population did not attend. Questions could then be asked
about the reasons why, such as whether it was due to the marketing or a lack of
knowledge or information as it pertains to a business. He felt that by starting there,
efforts could then be made to begin to dissect not just the participation of the
African-American community but all populations in the City of Dover, noting that
the Hispanic population was growing. Dr. Casson stated the need to look at the
broader area and then begin to pinpoint why certain populations were not getting the
services that they need.
Noting that there are budgetary constraints, Dr. Casson stated the importance of
getting strategies and action items in place that would give the highest yield. This
would be done through DDDM, through development of an inclusion plan, and by
drilling deeper into the questions being asked. Dr. Casson reiterated that the question
was what the current process was for engaging the public and the African-American
community.
Mr. Anderson noted that strategic planning would be discussed by the Parks,
Recreation, and Community Enhancement Committee.
Mr. Hutchison stated that he was impressed with the information that had been
gathered and asked if the number of students graduating versus those dropping out
of high school was being looked at from an economic development and workforce
perspective. Responding, Dr. Casson stated that this would go directly to the point
of DDDM. He questioned where those students who were dropping out were going
and what workforce needs in the City could be filled and addressed.
Mr. Hutchison expressed his opinion that this information could be helpful in the
future.
Mr. Sudler questioned what one (1) of the major issues was that was identified by the
African-American business owners in the downtown area in regard to conducting
business in the City of Dover, or an issue related to engaging, encouraging, or
advocating for individuals of African-American, Hispanic, or minority descent. In
response, Dr. Casson advised members that this study was actually focused on the
services and programs that were coming out of the City.
Mr. Sudler questioned if a survey could be conducted or if questions could be asked
to get current feedback from African-American business owners and minority owners
as a whole. Dr. Casson stated that this request went directly to the recommendations
of the study in terms of the inclusion plan. He indicated that this would bring the
Página 31
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 28
stakeholders to the table to talk about the strategic plan and the focus for addressing
some of the needs pertaining to African-American business and workforce
development.
Dr. Casson encouraged members to consider the economic inclusion plan, which
would include the type of surveys that Mr. Sudler mentioned to gather information
and find out why African Americans were or were not being engaged.
The Committee recommended acceptance of the report as presented.
By consent agenda, Mr. Neil moved for approval of the Committee's recommendation,
seconded by Mr. Cole and carried by a unanimous roll call vote.
Request to Waive Demolition Liens - 27 North New Street and 45, 67, and
101 South Queen Street
Mr. Scott Koenig, City Manager, advised members that the City had been working
in the Downtown Development District (DDD) to improve a number of different
components in this area and a number of structures had been demolished there over
the last few years. Central Delaware Habitat for Humanity, Inc. had offered to
purchase four (4) properties from Dr. Joe Burden, Jr. Under the proposal, the liens
would be transferred from Dr. Burden to Habitat, and Habitat would then pay the
City of Dover $7,500 for each of the four lots (4), for a total of $30,000. The subject
properties were 27 North New Street and 45, 67, and 101 South Queen Street. Each
of the properties had been encumbered by a demolition lien due to prior dangerous
building declarations. A summary of the offer and associated write-off amounts was
as follows:
Address Offer Price Total City Write-Off City's 2015
Lien Amount Amount Assessed
Land Value
27 N. New Street $ 7,500 $ 22,274.97 $ 14,774.97 $ 13,100
45 S. Queen Street $ 7,500 $ 13,862.18 $ 6,362.18 $ 11,900
67 S. Queen Street $ 7,500 $ 14,348.46 $ 6,848.46 $ 13,800
101 S. Queen Street $ 7,500 $ 15,684.02 $ 8,184.02 $ 13,400
Totals $ 30,000 $ 66,169.63 $ 36,169.63
Mr. Koenig advised members that, while the write-off would be substantial, the long
term benefit of the proposal outweighed the financial impact of this write-off.
Mr. Koenig stated that it was staff’s strong belief, from an administrative standpoint,
that transferring this property would be a good thing for the City of Dover. He noted
that the City had preached home ownership in this area and Habitat would virtually
guarantee long-term home ownership.
Página 32
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 29
Staff recommended authorizing the properties to be transferred from Dr. Joe Burden,
Jr. to Central Delaware Habitat for Humanity without collecting the City's liens
against the properties in exchange for a payment of $30,000 from Central Delaware
Habitat for Humanity ($7,500 per parcel).
In response to Mr. Shevock regarding whether Dr. Burden owned any other
properties in the City, Mr. Koenig stated that Dr. Burden owned a substantial amount
of property within the City.
Responding to Mr. Shevock as to whether either the write-off or the total lien amount
could be transferred to Dr. Burden’s other properties and attached for payment,
Mr. Koenig stated his belief that this could not be done. He expressed his opinion,
in the larger context of dealing with distressed properties, that this would not be a
good precedent to start and was unsure if the City could legally do this. Mr. Koenig
stated that staff had talked to Mr. William Pepper, Deputy City Solicitor, about this
particular transaction and there was no legal reason that the City could not transfer
a lien from one (1) property owner to another and then forgive the lien.
Mr. Koenig advised members that Dr. Burden had been working with staff and had
paid all of his FY 15 taxes. He stated his belief that Dr. Burden had paid FY 16 taxes
on all but the subject properties; therefore, progress had been made in a number of
areas. Mr. Koenig indicated staff’s belief that this land transfer would clear the water
in some cases and provide a fast forward to home ownership on these four (4) lots.
He stated that if the City continued to pursue the liens and forced a tax sale, there
would be no guarantee that those purchasing the properties would occupy them, as
they could be rentals. Mr. Koenig reiterated, under the proposal, that the City would
be virtually guaranteed home ownership.
Mr. Sudler stated that he was glad that Dr. Burden and the City of Dover had reached
an understanding and agreement and were working together.
The Committee recommended approval of Staff’s recommendation to authorize the
properties to be transferred from Dr. Joe Burden, Jr. to Central Delaware Habitat for
Humanity without collecting the City's liens against the properties in exchange for
a payment of $30,000 from Central Delaware Habitat for Humanity ($7,500 per
parcel).
By consent agenda, Mr. Neil moved for approval of the Committee's recommendation,
seconded by Mr. Cole and carried by a unanimous roll call vote.
Disposition of City Owned Land – Property Located at 710 and 715 Slaughter
Street
Members were informed that the City of Dover acquired properties located at 710
and 715 Slaughter Street at a monition sale due to liens for taxes and demolition
expenses. Mr. Scott Koenig, City Manager, stated that these were excess properties,
as the City had no use for them and would be better served by the properties being
redeveloped and restored as taxable properties.
Página 33
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 30
Members reviewed the details regarding these properties as follows:
Address Land Area City Expenses and City's 2015
Other Charges Assessed Land
Value
710 Slaughter Street 0.1722 Acres $12,462.50 $39,400
(7,500 sq ft)
715 Slaughter Street 0.1079 Acres $8,653.75 $38,700
(4,700 sq ft)
Mr. Koenig stated that the City had been in an active demolition phase for some time
and was prepared to start releasing some properties for redevelopment. He advised
members that these two (2) properties lie outside the City’s Downtown Development
District, and the Central Delaware Habitat for Humanity, Inc. had not placed a high
priority on them. Mr. Koenig stated that it was Staff’s belief that a higher market
value could be recovered using the “Standard Method of Disposition” to dispose of
the properties, either through sealed bid or auction, in hopes of recovering in excess
of the demolition liens associated with them.
Staff recommended the following: 1) determining that the subject properties are
excess properties; and 2) authorizing the City Manager to dispose of the subject
properties using the “Standard Method of Disposition” of the Procedure for Sale and
Disposition of Real Property.
The Committee recommended approval of staff’s recommendation.
By consent agenda, Mr. Neil moved for approval of the Committee's recommendation,
seconded by Mr. Cole and carried by a unanimous roll call vote.
Proposed Ordinance #2015-13 Amending Appendix B - Zoning, Article 3 -
District Regulations, Section 2 - General Residence Zones (RG-1 and RG-2);
Article 4 - Zoning Bulk and Parking Regulations, Section 4.2 - RG-1 (General
Residence Zones); and Article 5 - Supplementary Regulations, Section 1 -
Supplementary Regulations Applying to Residence Zones
Mrs. Ann Marie Townshend, Director of Planning and Community Development,
explained that proposed Ordinance #2015-13 was one (1) of the implementation
measures for the City’s Downtown Development District program and the Restoring
Central Dover plan. One (1) of the measures called for in the Restoring Central
Dover plan, as well as a number of other planning documents that preceded it, was
to allow flexibility of housing styles within the downtown area. Mrs. Townshend
advised members that the downtown neighborhoods were largely zoned RG-1
(General Residence Zone). The proposed ordinance would allow townhouses and
duplex dwellings as a conditional use. She indicated that several restrictions were
included to make sure that these dwellings would be on individual lots. The
Página 34
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 31
ordinance also stated that no more than four (4) dwelling units would be allowed in
a group of townhomes and there would be separation between groups of townhomes.
Shared access or access from the alley would be encouraged when appropriate.
Referring to Lines #101-104 of the proposed ordinance, Mrs. Townshend stated that
the language was changed so that multiple dwellings, which is another term for
apartments, would be permitted only in the RG-2 (General Residence Zone) district,
not in the RG-1 district. She noted that this addressed one (1) of the challenges that
Staff had been dealing with for a number of years. As of 2006, the conversion of
homes to apartments was no longer allowed, but the ordinance amendment would
make it clear that apartments would not be a permitted use in the RG-1 zone, and any
such use there would be legal nonconforming.
Mrs. Townshend advised members that additional administrative waivers were
included in the ordinance. One (1) would allow minor lot line adjustments among
a finite piece of land as an administrative process as long as it meets the bulk
requirement, the minimum lot size, and the minimum lot width. Mrs. Townshend
noted that many lots in the downtown area do not meet the requirements; therefore,
there was a need to go to the Board of Adjustment just to reapportion existing land.
She explained that Section 2.6 (b), beginning on Line #152 of the ordinance, would
allow administrative discretion to make these adjustments if the number of lots was
not being increased. Mrs. Townshend explained, for example, that there may be
three (3) lots that are together and that have widths of 20 feet, 30 feet, and 25 feet.
This provision would allow these lots to be distributed more evenly without having
to go to the Board of Adjustment.
Mrs. Townshend advised members that the waiver recommendation in Section 2.6
(c) on Line #158 would allow parking surfaces other than hard-paved, dust-free
surfaces, as long as those parking areas were located in the rear yard. She explained
that there were many areas downtown where people were parking on the grass or dirt.
It was being suggested that staff be granted administrative discretion to allow stone
in the rear yard if these areas were off an alley. Mrs. Townshend stated that staff was
looking at the bulk standards, which are the lot area and lot width, and bulk standards
were proposed that would be more compatible with what was in the area rather than
being more suburban in nature.
In reference to Line #194, Mrs. Townshend explained that an infill lot is a vacant lot
in a developed area. She stated that supplementary regulations would be amended
to develop infill standards that would make it clear that on an infill lot, sidewalks,
some degree of landscaping, and a primary façade that fronts on the street would be
required.
Mr. Townshend stated that, as an amendment to the Zoning Ordinance, the proposed
ordinance would go to City Council for First Reading, to the Planning Commission
for a public hearing, and then would return to City Council with a recommendation
Página 35
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 32
from the Planning Commission for a public hearing and final action. She noted that
there may be minor amendments during that process, but she did not expect
significant changes.
In response to Mr. Sudler, Mrs. Townshend stated that recycled asphalt that is
tamped and packed would be sufficient for alternative rear parking under the
ordinance amendment.
Responding to Mr. Hutchison regarding how many people can live in a townhouse,
Mrs. Townshend stated that the City does not regulate this number. She explained
that no more than five (5) unrelated people can live in any type of single-family
dwelling, whether attached, detached, or semi-attached. She noted that staff planned
to review all residential zones and some of the definitions that go with them in the
next year or so. Mrs. Townshend indicated that the provision regarding five (5)
unrelated people can, at times, create problems and Staff planned to look at how
other jurisdictions had treated this.
Mr. Hutchison stated that he supported the concept; however, he cautioned that Staff
should be very careful moving forward in this regard, noting that five (5) people can
mean five (5) cars.
In regard to Lines #172-#173 referencing lot width (ft.) per dwelling unit,
Mr. Anderson questioned if this referred to the total lot width. In response,
Mrs. Townshend stated this referred to the width of the house plus the land that goes
with that house. For example, noting that each house in a duplex has a side yard, she
stated that the lot width would include the side yard plus the house area.
Mrs. Townshend stated that townhouses do not have side yards, so the lot could not
be narrower than a 20-foot townhouse.
Responding to Mr. Sudler, Mrs. Townshend stated that a 20-foot wide townhouse
would not need 40 feet of parking but would need one (1) off-street parking place.
She indicated that the proposed ordinance would encourage access off the alley and
preserve the on-street parking. In this way, the rhythm of the downtown
neighborhoods would not be so intersected with driveways. Mrs. Townshend noted
that staff would have to deal with the definition of family when reviewing the
residential zones.
In response to Mr. Sudler, Mrs. Townshend stated that the size of the average parking
space for one (1) individual would be 9 feet by 18 feet.
The Committee recommended adoption of proposed Ordinance #2015-13.
By consent agenda, Mr. Neil moved for approval of the Committee's recommendation,
seconded by Mr. Cole and carried by a unanimous roll call vote. (The First Reading of the
ordinance will take place during the latter part of the meeting.)
Página 36
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 33
Semi-Annual Review - Statistics Regarding Jobs and Businesses Gained and
Lost in the City of Dover Since January 2015
The Committee deferred this item until the next meeting.
By consent agenda, Mr. Neil moved for approval of the Committee's recommendation,
seconded by Mr. Cole and carried by a unanimous roll call vote.
By consent agenda, Mr. Neil moved for acceptance of the Legislative, Finance, and
Administration Committee Report, seconded by Mr. Cole and carried by a unanimous roll call
vote.
DISCHARGING THE AD HOC FINANCIAL AND OPERATIONAL ADVISORY
COMMITTEE
During the Regular Council meeting of November 12, 2013, the Ad Hoc Financial and Operational
Advisory Committee members were appointed to one (1) year terms to expire November 10, 2014.
The Committee was created to advise the Legislative, Finance, and Administration Committee, who
would in turn advise City Council as a whole on operations, financial issues, and organizational
structure within the City of Dover.
The Committee met four (4) times, the last time being April 17, 2014, and had since become
inactive. It was recommended that the Ad Hoc Financial and Operational Advisory Committee be
formally discharged.
Mr. Anderson expressed concern with discharging the committee without receiving their final report.
Responding, Mr. Slavin stated that he reached out to the chair of the committee and they indicated
that a final report would not be forthcoming.
Mr. Anderson expressed hope that the new committee of staff and City Council members that will
be reporting on cost savings in government will do due diligence and meet soon.
Mr. Anderson moved to discharge the Ad Hoc Financial and Operational Advisory Committee.
The motion was seconded by Mr. Sudler and unanimously carried.
FIRST READING OF PROPOSED ORDINANCE #2015-13 AMENDING APPENDIX B -
ZONING
Council President Slavin reminded the public that copies of the proposed ordinance were available
at the entrance of the Council Chambers or could be obtained from the City Clerk's Office. Since
the ordinance amends the Zoning Code, a public hearing is required. Staff recommended referral
of the amendments to the Planning Commission on September 21, 2015 and that a public hearing
take place during the Council Meeting of October 12, at 7:30 p.m., at which time, final action by
Council will take place.
Mr. Anderson moved to refer the amendment and set a public hearing before City Council for
October 12, 2015 at 7:30 p.m. as recommended by staff. The motion was seconded by Mr. Neil
and unanimously carried.
Página 37
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 34
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of the
Zoning Ordinance Amendments as read by the City Clerk, by title only, as follows:
< Proposed Ordinance #2015-13 Amending Appendix B - Zoning, Article 3 - District
Regulations, Section 2 - General Residence Zones (RG-1 and RG-2); Article 4 - Zoning Bulk
and Parking Regulations, Section 4.2 - RG-1 (General Residence) Zones; and Article 5 -
Supplementary Regulations, Section 1 - Supplementary Regulations Applying to Residence
Zones
ANNEXATION/REZONING REQUEST/FIRST READING OF PROPOSED ORDINANCE
#2015-14
A request was received for annexation and rezoning of properties located on the easterly side of
Nixon Lane consisting of .5171+/- acres (Lot 1) and 121 Acorn Lane, consisting of .4609+/- acres
(Lot 2), owned by Paul C. Phillips and Theresa HoShue. This property is currently zoned RS-1-
Single Family Residential (Kent County zoning classification) and the proposed zoning is R-8 - One
Family Residential (City of Dover zoning classification). Staff recommended that the request be
referred to the Utility Committee on September 14, 2015; to the Planning Commission on
September 21, 2015; and that a public hearing be set for October 12, 2015 at 7:30 p.m. (Tax Parcels:
ED-00-068.19-01-25.00-000 (Lot 1) and ED-00-068.19-01-25.01-000 (Lot 2); Council District: 3;
Planning Reference: AX-15-01).
Mr. Hare moved for referral, as recommended, seconded by Mr. Anderson and unanimously
carried.
In accordance with Section 1-9 of the Dover Code, Council acknowledged the First Reading of
proposed Ordinance, as read by the City Clerk by title only, as follows:
ORDINANCE #2015-14 AMENDING THE ZONING ORDINANCE AND ZONING MAP OF THE
CITY OF DOVER BY CHANGING THE ZONING DESIGNATION OF PROPERTIES LOCATED
ON NIXON LANE AND AT 121 ACORN LANE.
COUNCIL MEMBERS' ANNOUNCEMENTS
Mr. Sudler announced that there will be a second 4th District Quarterly meeting in partnership with
Dover Community Action Forum (DCAF) and Mount Zion AME Church and Social Action
Commission on Tuesday, September 8, 2015 from 7:00 p.m. to 9:00 p.m. at the Mount Zion AME
Church, 101 North Queen Street. He stated that the topic is the current form of government versus
the proposed strong mayor/city council form of government and encouraged all residents from all
districts to participate.
Mr. Lewis announced that the 2nd District will be having a community meeting on Saturday,
September 12, 2015 at 2 p.m. at Victory Christian Fellowship, 18 Greenhill Avenue. The meeting
is being held to hear the concerns of the constituents in the 2nd district.
Mr. Anderson announced that the Kent County Economic Summit would be held on
September 22, 2015 at Delaware Tech. He noted that it is an important event and encouraged
members of the city and the business community to be well engaged in the summit.
Página 38
CITY COUNCIL MEETING OF AUGUST 24, 2015 PAGE 35
Mr. Sudler announced that, as a newly elected Council person, he is very proud of the City Manager,
the Department Head, the City Planner, and all the City officials and State legislators who
participated in the Lincoln Park and Simon Circle walk through the previous Saturday. He noted that
they not only had a really good time, they were also able to identify issues that can be rectified.
Mr. Sudler especially thanked 1st District Councilman Hosfelt and Council President Slavin for
taking on a role of leadership and keeping them together and focused. He stated that he feels very
proud to be a City Councilman and he hopes that they continue the momentum and continue to
function as one, united.
Mr. Hutchison announced that the State Firemen’s Parade would be held on September 19, 2015
from noon to 4:00 p.m. beginning in front of Legislative Hall. He also announced that the Dover
Fire Department will have open house on October 10, 2015 beginning at noon.
Mr. Sudler moved for adjournment, seconded by Mr. Hosfelt and unanimously carried.
Meeting adjourned at 8:17 P.M.
TRACI A. McDOWELL
CITY CLERK
All ordinances, resolutions, motions, and orders adopted by City Council during their Regular
Meeting of August 24, 2015, are hereby approved.
ROBIN R. CHRISTIANSEN
MAYOR
/TM
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Council-Minutes\2015\08-24-2015.wpd
Página 39
DOVER HUMAN RELATIONS COMMISSION
The Dover Human Relations Commission (DHRC) meeting was held on May 27, 2015 at 5:15 p.m.
with Vice Chairman McGiffin presiding. Members present were Mr. Henderson, Mr. Roach (arrived
at 5:29 p.m.), Mr. Ruane, Mrs. Sadusky (arrived at 5:17 p.m.), Ms. Smith, and Ms. Stewart. Ms. Hicks
was absent.
AGENDA ADDITIONS/DELETIONS
Mr. Henderson moved for approval of the agenda, seconded by Mr. Ruane and unanimously
carried.
Election of Commission Chair
Mr. McGiffin advised members that Chairman Cecil Wilson had resigned from the DHRC and it
would be necessary to elect a new Chair.
Mr. McGiffin moved to nominate Ms. Smith to serve as Chair, seconded by Mr. Ruane and
unanimously carried.
Mr. Henderson moved to close nominations, seconded by Mr. Ruane and unanimously carried.
By unanimous consent, Ms. Smith was elected to serve as Chair of the DHRC.
Ms. Smith expressed her appreciation for being entrusted with the role of DHRC Chair and stated
that she would do her best to serve members and the community with integrity and ensure that every
voice is heard.
Mr. McGiffin indicated that he would be happy to continue to serve as Vice Chairman.
Discussion - Recent Events Involving the Dover Police Department
Maj. Marvin Mailey, Deputy Chief of Police, advised members that a couple of weeks ago a video
was released of an arrest made by Officer James Webster on August 24, 2013. Maj. Mailey indicated
that a Use of Force Report is generated anytime an officer uses force during the course of an arrest
and the City of Dover Police Department had been in possession of the videotape since the onset of
this report. He advised members that at the time of the incident, Mr. James Hosfelt was serving as
Chief of Police, current Police Chief Paul Bernat was a Major in the Department, and Maj. Mailey
had been working in the Department’s Internal Affairs Division. Maj. Mailey explained that he had
done the investigation himself and, although the details of the investigation were protected under the
Law-Enforcement Officers’ Bill of Rights, it was found that Officer Webster had violated policy.
He was punished appropriately and was suspended for an undisclosed length of time. Maj. Mailey
stated that Officer Webster was retrained and put back to work as part of the closure of the
investigation.
Maj. Mailey stated that when the incident was being investigated in 2013, the videotape was shown
to the State Attorney General's Office, who presented it to a grand jury. The grand jury elected not
to charge Officer Webster at that time. It was also presented to the U. S. Department of Justice
(DOJ) in Wilmington, where it was reviewed. No wrongdoing was seen and no charges were
pursued. Maj. Mailey assured members that all of the information that the Dover Police Department
could provide from a prosecutable standpoint, as far as their investigation, was provided because the
Página 40
DOVER HUMAN RELATIONS COMMISSION
MEETING OF MAY 27, 2015 PAGE 2
Department investigated the incident criminally as well as internally. He explained that an internal
investigation is separate from a criminal investigation. During an internal investigation, an officer
is compelled to answer questions that they would not normally answer during a criminal
investigation since they would be invoking their Fifth Amendment right. Maj. Mailey stated that the
U.S. Department of Justice passed on prosecuting the case and Officer Webster returned to work.
Maj. Mailey advised members that this matter was brought to light again when a law suit was
subsequently filed by Mr. Latif Dickerson and the American Civil Liberties Union (ACLU) became
heavily involved. During the course of this civil suit, the videotape was deemed non-confidential
by the judge. Maj. Mailey stated that it became evident that the video was going to be released at
some point, and the City reached an impasse in negotiations with the ACLU as to how and when this
would occur. He explained that the ACLU was threatening to release it before the City could prepare
residents for what might happen. Maj. Mailey noted that it was desired to avoid, in Dover, events
similar to those that had recently occurred in Ferguson, Missouri; Baltimore, Maryland; and all
across the United States.
Maj. Mailey explained that the City contacted and met with the National Association for the
Advancement of Colored People (NAACP), showed them the videotape, and informed them that the
City was aware of the event. It was explained that the Police Department had investigated the
incident and posed it to two (2) individual law enforcement agencies, the DOJ and the State Attorney
General’s Office, who passed on prosecution. Maj. Mailey stated that the NAACP was advised that
the City did not try to hide the incident and acknowledged that what Officer Webster had done was
wrong and his actions were not condoned in Dover. Maj. Mailey indicated that the City made the
NAACP aware of everything that potentially could come out of this videotape.
Maj. Mailey advised members that the NAACP had questions which the City answered, and the City
and the NAACP worked together to a point. He stated that Mr. Lamar Gunn, President of the
local chapter of the NAACP, did not want the City to release the videotape because he feared
backlash in the community in the way of protests, demonstrations, and destruction of property, which
Maj. Mailey stated did not occur. He indicated that people in the community were not happy about
it, as reflected in posts on the internet and the Police Department’s website as well as calls made to
the Police Department; however, they were not upset to the point of rioting or demonstrating.
Maj. Mailey indicated his belief that this was because there had been closure to what happened,
noting that the Attorney General’s Office reopened the investigation, the videotape was shown to
another grand jury, and Officer Webster was charged. Maj. Mailey stated his understanding that
Officer Webster’s trial date would be coming up on May 28, 2015, noting that he was currently
suspended without pay from the Dover Police Department pending the criminal case. Maj. Mailey
stated that the Dover Police Department’s investigation had been completed in 2014 when the case
was referred to the two (2) agencies and discipline was imposed.
Responding to Ms. Smith, Maj. Mailey stated his belief that the reason this issue resurfaced was due
to the civil lawsuit filed by Mr. Dickerson, noting that the possibility of the videotape being released
probably contributed.
Página 41
DOVER HUMAN RELATIONS COMMISSION
MEETING OF MAY 27, 2015 PAGE 3
For clarification, Mr. McGiffin explained that on the criminal side of the law, the Dover Police
Department went to the State prosecuting authority, who initially determined to take no action. The
Federal prosecuting authority also investigated and decided to take no action. The new State
Attorney General then decided to take another look at it and, this time, the State decided to take
prosecutorial action, all of which was on the criminal side of the law. On the civil side of the law,
Mr. Dickerson and the ACLU of Delaware decided to take civil action. Mr. McGiffin informed
members that there were two (2) different cases on two (2) different tracks; the government deals
with the criminal track, but the civil track is handled by Mr. Dickerson or the ACLU on his behalf.
Mr. McGiffin stated that this item had been placed on the agenda because he felt it important for
the DHRC to acknowledge that this event took place and the Commission did not have a role in the
City’s response to it, stating that the DHRC was not asked for advice or comment. Mr. McGiffin
felt that this was the kind of issue that the DHRC should be able to address when the Commission
matures as an organization, and that members should be in the loop when something like this
happens.
Maj. Mailey advised members that former DHRC Chairman Wilson was aware and sat in on one (1)
of the meetings just prior to the videotape being shown.
In response to Mr. Ruane, Maj. Mailey indicated that the Use of Force Policy is in the Dover Police
Department’s rules and regulations and policy manual, stating his belief that this information would
be available to the public. Maj. Mailey advised members that the behavior seen on the videotape,
as far as a kick to the head, was outside of the policy and was not what officers are trained to do.
He indicated that the Department has a continuum with respect to the use of force that progresses
from voice inflection through a hands technique for grasping people, the use of taser and pepper
spray, up to the use of lethal force.
In response to Mr. Ruane about training for the new officers that were being hired at the Police
Department, Maj. Mailey confirmed that these officers would obtain basic knowledge about use of
force from State training. When they come to the Dover Police Department, they would go through
a field training tour with another seated officer. Maj. Mailey explained that they would go over
related policies, procedures, and regulations as part of that orientation and training.
In response to Mr. Ruane, Maj. Mailey confirmed that this particular officer had undergone that
training and then was retrained when he returned to active duty on the force. He informed members
that officers undergo training once per year, which he compared to continuing education, noting that
they are re-certified in CPR and review criminal law. Maj. Mailey stated that they may also go over
how to deal with the public, verbal communication skills, safe and legal traffic stops, avoiding
profiling, integrity classes, etc.
In response to Ms. Smith as to whether Officer Webster’s discipline included non-payment,
Maj. Mailey stated that Officer Webster had been placed on paid administrative leave up to a certain
point in the process when discipline took over. Maj. Mailey could not speak to why Officer Webster
Página 42
DOVER HUMAN RELATIONS COMMISSION
MEETING OF MAY 27, 2015 PAGE 4
was disciplined or whether or not he was paid during his punishment time since this was part of the
Law-Enforcement Officers’ Bill of Rights; he could only say that Officer Webster was disciplined
by the agency.
Mr. McGiffin expressed his hope that this event would show members that there is a need to increase
the DHRC’s profile as a commission and develop credibility. He felt that this would be done
through the committee work that the Commission had agreed to do, noting that this would expose
everyone in the City to the DHRC. Mr. McGiffin stated that the DHRC’s research project would
involve interviewing people, making online surveys available and offering focus groups for
discussion of diversity issues, and the police would also be asked to cooperate in this regard. The
DHRC would work with all of the various City agencies. Mr. McGiffin hoped that if there were
another similar situation in the future, people would look to the DHRC. He expressed his opinion
that the DHRC should recommend that the City formally include the DHRC in their plan to deal with
emergencies of this nature so that the Commission can do what it is charged with and wants to do.
In response to Mr. Ruane, Maj. Mailey stated that Chief Bernat had taken leadership and proactively
held meetings in regard to this incident, and the Mayor was also involved.
Mr. Ruane suggested, as the new Chair of the DHRC, that Ms. Smith look for an opportunity to
speak with the Mayor and the Police Chief about who the DHRC is and what their role might be.
He advocated using this incident as an example and asking that the City include the DHRC when
inviting parties to public meetings to address these situations proactively.
Mr. Henderson stated that other ad hoc committees, religious communities, and ministers should not
be overlooked, noting that he had seen this approach used in Baltimore and other cities. He advised
members that Dover’s Interdenominational Ministerial Alliance (IMA) was very proactive.
Mr. Roach stated the importance of the Police Department building rapport within the community.
In response to Ms. Smith regarding how the DHRC could support and strengthen its relationship
with the Police Department, Maj. Mailey suggested that members do a ride along with officers to see
the complaints they respond to and how they interact with the public. He concurred with Mr. Roach
that more officers were needed walking in the community and stated that a program had been started
to have officers walk through neighborhoods as part of extra duty assignments. He indicated that
this was working in Wilmington and felt it would work in Dover. Maj. Mailey advised members that
the City’s police cadets would be working in the downtown area, the Dover Public Library, and in
neighborhoods.
Maj. Mailey stated that for many years the Police Department had been forced to do more with less
and had not had the personal contact needed since they were occupied with going after those
who were getting out of line. He indicated that if officers had more time for inter-personal
communication, there would be less misunderstanding. Maj. Mailey advised members that, just as
in other professions, there are good and bad police officers; however, he assured members that bad
officers in Dover would not last long because there are corrective measures in place. Maj. Mailey
Página 43
DOVER HUMAN RELATIONS COMMISSION
MEETING OF MAY 27, 2015 PAGE 5
stated that the Dover Police Department offers a Citizens’ Police Academy for a couple of weeks
over the summer that allows citizens to learn about how the Department operates, what is done
during the course of drug and burglary investigations, community policing, and the Department’s
social media program. He noted that the social media program had helped the Department reach out
to the community on a lot of fronts, noting that the Dover Police Department was featured in a recent
YouTube video, and there was a similar follow-up video as well. Maj. Mailey invited members to
tour the Police Department and meet the officers. He stated that it was important for officers to get
out and have fun with the community, so the community and Department could get to know one
another.
Ms. Smith requested that the DHRC be informed when the Citizens’ Police Academy is held.
Ms. Smith stated that the purpose of inviting someone from the Police Department was to create an
awareness that the DHRC was not at the table in regard to the incident that occurred, discuss why
this was the case, and find out how to get to the table. She stated that she would be happy to meet
with the Mayor and Police Chief and invited members to join her to find out what was needed to
solidify the relationship and create more synergy. Ms. Smith stated that the DHRC would have no
power unless they had people behind them, and questioned how to get a greater following, noting
that, currently, there were only eight (8) total people involved. She felt that once the Commission’s
constituents come to recognize and respect them, the DHRC would have power and she requested
members for feedback in this regard.
Mr. Roach indicated that members attend certain community events or meetings individually, and
felt it important for members to attend some of these occurrences together to show that the
Commission is unified, noting that this might bring about support.
In response to Ms. Smith as to the specific target audience and types of events, Mr. Henderson stated
that last week he attended a meeting with Fourth District Councilmen Anderson and Sudler at the
Solid Rock Baptist Church. In regard to the police videotape incident, Mr. Henderson expressed his
belief that the DHRC was not invited to the table because others were busy trying to put the fire out,
but stated the need for the DHRC to make their own presence. Mr. Henderson felt that the DHRC’s
presence should be in Districts 3 and 4 in various meetings and functions and with various churches.
Mr. Ruane noted that there was a recent shooting in District 2.
Mr. Roach stated the need to be there for everyone, since the sensitivity and importance of various
issues may be subjective.
Ms. Smith questioned how to pinpoint those events that the DHRC needs to attend as a unit and also
ensure that it is a diverse group of people, how to communicate with one another that this is where
members need to be, and what the DHRC’s agenda would be. She stated the need to be strategic in
Página 44
DOVER HUMAN RELATIONS COMMISSION
MEETING OF MAY 27, 2015 PAGE 6
identifying whether the target audience would be at the grass roots or upper echelon levels.
Ms. Smith reminded members that they had previously discussed partnering with groups of people
as a grass roots effort, which would be more proactive than attending events. She felt the need to
be very strategic in creating power and orientation.
Mr. Henderson agreed that the Commissioners needed to identify events to attend, noting that he gets
information online. He also stated that Rev. Rita Mishoe Paige, member of the IMA, is very active
in the community. Mr. Henderson indicated that he would like to think in terms of those he
represents rather than those who follow. He stated the need for members to get out of their comfort
zones as Commissioners. Mr. Henderson noted that Councilmen Anderson and Sudler, particularly
Councilman Sudler, were trying very hard to get established, become aware and open up community
forums, and indicated that, as a commissioner and member of the IMA, he planned to attend every
one (1) of those meetings that he could. He stated that if he hears of a community meeting
anywhere, he wants to be there to be aware of what is going on.
Mr. McGiffin advised members that when he was serving as City Councilman, there were seven (7)
different community meetings that took place at various levels of frequency. He felt it incumbent
upon himself, as a Third District Commissioner, to contact his two (2) Council district
representatives to find out when such meetings are held.
Mr. Roach suggested that each commissioner could identify two (2) or three (3) events coming up
in the near future and communicate them to the whole group so members could attend as a whole.
In response to Mr. Ruane, Mrs. Traci McDowell, City Clerk stated that new Council members were
not made aware of the DHRC during their orientation sessions since orientation involves getting
them on board, telling them what their responsibilities are, and letting them know how to get
information.
Mr. Ruane commented that, in addition to meeting with the Mayor and Police Chief, there was an
opportunity to educate Council about who the DHRC is and how they got to be where they are. He
questioned whether newly elected Council representatives have knowledge of the DHRC or that they
have a connection with commissioners. Noting that there were five (5) new members of Council,
he felt the DHRC should have some strategy for reaching out to Council, whether through written
communication or a meeting.
Scheduling of November 2015 Meeting Date
Ms. Smith questioned whether members should continue to meet once per month or take a few
months off. She stated her opinion that there was a need to meet to build upon momentum,
determine a specific direction, continue to build a brand, get into the community, make the DHRC’s
presence known, and get clarity on who their audience is.
Mr. Roach stated his preference for hour-long meetings once per month.
Página 45
DOVER HUMAN RELATIONS COMMISSION
MEETING OF MAY 27, 2015 PAGE 7
By unanimous consent, members scheduled monthly meetings to be held at 5:15 p.m. on the
following dates:
June 23, 2015
July 28, 2015
August 25, 2015
September 29, 2015
October 27, 2015
November 17, 2015
Ms. Smith requested members to keep one another apprised through email about community events.
Responding, Mr. McGiffin cautioned members of the DHRC’s need, as a public body, to comply
with the Freedom of Information Act (FOIA) and that information should be distributed through the
City Clerk’s Office.
Ms. Denise Devine, Assistant City Clerk, advised members to avoid serial meetings, including
emails or text messages, which could violate FOIA. She stated, if members were planning to get
together, they should contact the Clerk’s Office to determine who should or should not attend, and
whether there would be a need to post the gathering as a public meeting.
Ms. Smith requested that, over the next 30 days, members think about the events that they wish to
attend, in order to pinpoint their market and whether they are trying to engage leadership or grass
roots, noting that this would determine the events where they put most of their energy.
Mr. Ruane questioned if both areas could be addressed. Responding, Ms. Smith stated that focusing
on two (2) totally different markets might cause members to run themselves ragged. She stated that
focusing on one (1) market and building from there would not mean that members could not attend
both types of events, it would just identify the target audience and a means of reaching them.
DHRC Committee Updates
By unanimous consent, this item was deferred due to time constraints.
Commission Members’ Announcements
By unanimous consent, this item was deferred due to time constraints.
Mr. Henderson moved for adjournment, seconded by Mr. Roach and unanimously carried.
Meeting adjourned at 6:16 p.m.
S. Renee Smith
Chairwoman
SRS/TM/js/dd
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Misc-Minutes\HUMAN RELATIONS COMMISSION\2015\05-27-2015 Dover Human Relations Commission.wpd
Página 46
DOVER HUMAN RELATIONS COMMISSION
The Dover Human Relations Commission (DHRC) meeting was held on July 28, 2015 at 5:15 p.m.
with Chairwoman Smith presiding. Members present were Mr. Henderson (departed at 6:15 p.m.),
Mr. McGiffin, Mr. Roach (arrived at 5:33 p.m.), Mrs. Sadusky, and Ms. Stewart. Ms. Hicks was absent.
AGENDA ADDITIONS/DELETIONS
Mr. Henderson moved for approval of the agenda, seconded by Mr. McGiffin and
unanimously carried.
Chair’s Resignation from the Communications Committee
Ms. Smith advised members that she was resigning from the Communications Committee, stating
that she would still be intricately involved in supporting the process; however, she wanted to give
her attention to the position of Chair.
Mr. McGiffin moved to accept the Chair’s resignation from the Communications Committee,
seconded by Mrs. Sadusky and unanimously carried.
DHRC Committee Updates (Deferred During the Meeting of May 27, 2015)
Ms. Smith stated that no committee updates were submitted. She informed members that Mr. Ruane
had emailed his resignation as Commissioner representing the Second District, noting that he would
be moving to California. Ms. Smith felt it might be fitting for members to acknowledge Mr. Ruane
in some way but was unsure when he would be leaving and indicated that she would advise members
when she got that information. Mr. Henderson noted that Mr. Ruane’s departure would be a big loss
to the DHRC and members concurred.
Chair 27-Day Update Report and Feedback
Meeting with Mayor and Chief of Police
Ms. Smith advised members that she met with Mayor Christiansen, Police Chief Paul Bernat, and
Maj. Marvin Mailey, Deputy Police Chief, and expressed her desire to understand their strategic plan
and top three (3) priorities. She explained to them that the DHRC wanted to support what the Police
Department is trying to do but remain neutral. Ms. Smith stated that they had indicated that their top
three (3) priorities were crime, jobs, and restoring hope to the City; however, their strategic plan had
not yet been developed. She indicated that Chief Bernat and Maj. Mailey advised that more police
cadets had been hired and one (1) of their strategies was to hire more officers to police. Ms. Smith
stated that Chief Bernat mentioned that morale in the Police Department had improved since he
became the Chief of Police one (1) year ago; however, crime had also increased. Chief Bernat had
indicated that morale was measured through a survey conducted two (2) years ago and he committed
to doing another survey. Ms. Smith felt that the DHRC should have some level of involvement or
partnership with this survey and presented this idea to members as a possibility.
Ms. Smith advised members that, during her meeting with the Police Department, Maj. Mailey had
brought up the Department’s ride along program, which was also mentioned during the DHRC
meeting of May 27, 2015, and she suggested that the DHRC follow up on this by email. She
suggested that the Department be made aware that the DHRC is interested in the Police
Página 47
DOVER HUMAN RELATIONS COMMISSION
MEETING OF JULY 28, 2015 PAGE 2
Department’s Citizen’s Police Academy as well. Ms. Smith recommended that something be put
in writing to show that the DHRC would like to be kept informed of what is happening and when
these programs are available and asked if members were interested in them.
Mr. McGiffin stated that he went through this Academy when he served on City Council, noting that
it is offered one (1) day per week for approximately 10 weeks. It is a thorough review of Police
Department operations with a fully developed curriculum that is presented by one (1) or two (2)
officers who bring in specialists. Mr. McGiffin felt that this was a great, eye-opening experience that
everyone should go through. He explained that members can schedule a ride along by contacting
Maj. Mailey and that participants typically arrive at 6:30 p.m. before shift end and ride with an
officer for eight (8) to 10 hours. He noted that officers drive the same streets as citizens but see very
different things.
In response to Ms. Smith, Ms. Sadusky offered to craft an email to Maj. Mailey to find out how
members could participate in the Citizens’ Police Academy and schedule a ride along.
Ms. Traci McDowell, City Clerk, requested that the City Clerk’s Office be copied on the email so
there would be a record of DHRC activities.
Mr. McGiffin questioned if Chief Bernat would be open to including some questions about diversity
issues in the survey relating to morale that was mentioned previously. This would solve a challenge
for the Government Policy, Programs and Practices (GPPP) Committee in terms of getting
information from the Police Department for the GPPP diversity research project. Responding,
Ms. Smith stated that this request could be included in the email that Mrs. Sadusky was planning to
compose.
After further discussion, members agreed that Ms. Smith, Mrs. Sadusky, and Mr. McGiffin would
review the email before it is sent.
Meeting with Chair, State Commission and the State Commission Supportive Role
Ms. Smith advised members that she had an interesting and enlightening meeting with Ms. Romona
Fullman, Director of the State of Delaware Division of Human Relations, who is an attorney, and
Mr. Calvin Christopher, Chair of the State Human Relations Commission (SHRC). Ms. Smith stated
that Ms. Fullman had expressed interest in coming to a DHRC meeting to introduce herself. Noting
that, as part of its enabling legislation, the DHRC does not have the infrastructure to handle
complaints, Ms. Smith indicated the State Division of Human Relations does have such
infrastructure. She stated that any complaints received by DHRC members should be handled by
the Division of Human Relations.
Ms. Smith advised members that DHRC members could attend SHRC meetings and could do so via
their Dover satellite location at 861 Silver Lake Boulevard, Suite 205. She indicated that the Office
of Civil Rights and Public Trust would be providing a presentation to the SHRC. Ms. Smith
reminded members that Ms. Allison Reardon, Director of the Office of Civil Rights and Public Trust,
Página 48
DOVER HUMAN RELATIONS COMMISSION
MEETING OF JULY 28, 2015 PAGE 3
had attended the DHRC meeting of March 10, 2015. At that time, there was a lot of uncertainty as
to what that Office would look like, what its mission would be, and how they would execute it.
Ms. Smith stated that there had been concern regarding how the Office of Civil Rights and Public
Trust, SHRC, and DHRC could partner so that they all could work in the direction of civil rights,
diversity, and cooperation. Ms. Smith indicated that Ms. Reardon would be speaking on this topic
and Ms. Smith offered to advise members of the meeting date.
Meeting with City Council President
Ms. Smith informed members that she met with City Council President Timothy Slavin, who
indicated that he would like an opportunity to come and greet members, which Ms. Smith planned
to schedule for September. She indicated that Mr. Slavin had no major suggestions for the DHRC,
but he requested that they get together again in the future to discuss how the Commission was
moving forward. He also requested that members not step beyond their role as commissioners, for
example by writing articles to the newspaper. Ms. Smith stated that she herself had originally
written to the newspaper on behalf of the Commission in response to killings that took place in South
Carolina; however, she had pulled this piece and rewritten it on her own behalf. She cautioned
members not to do what she had almost done in this regard.
Suggested Budget to City Council
Members were provided the City of Dover Human Relations Commission Budget Request
(Attachment #1) which was presented to City Council during the Special Council Meeting - Budget
Review on June 1, 2015. Chairwoman Smith advised members that she had reviewed this request
with City Council at that time and that Council was taken by surprise by this $5,000 request. She
felt there was a lack of understanding of the cost of training and development. Ms. Smith expressed
her opinion that much more than $5,000 was needed for the DHRC to operate; however, she
presented this amount since it had been provided to Council before she became Chair of the
Commission. She stated that $1,500 had been included for conflict resolution development training,
which would be mediation, and $1,000 for social media development. Ms. Smith indicated that
Council had approved $2,000 in expenditures and the DHRC must return to the City Manager to
request additional funds.
Training
Ms. Smith advised members that when she presented the DHRC budget request to City Council
during the Special Council Meeting - Budget Review of June 1, 2015, she was advised that the State
Human Relations Commission (SHRC) provides training; however, Mr. Calvin Christopher, Chair
of the SHRC, had informed her that the SHRC pays for training for its own members. The SHRC
did invite Ms. Smith to basic mediation training. Ms. Smith provided a flyer from the University
of Delaware Institute for Public Administration - School of Public Policy and Administration, which
provided details regarding a Four-Day Basic Mediation Training (Attachment #2), scheduled for
October 2015. She estimated that the SHRC had approximately 20 members, and three (3) or
four (4) would be attending this training. Ms. Smith indicated that the cost of the training was
approximately $800 and that she would like to participate, noting that she would not be 100%
comfortable trying to resolve conflict without this specific skill set.
Página 49
DOVER HUMAN RELATIONS COMMISSION
MEETING OF JULY 28, 2015 PAGE 4
Mr. McGiffin suggested that two (2) DHRC members be sent to mediation training, since funds were
available and the training was relevant to what the Commission does. Mr. McGiffin stated the
importance of having someone trained in mediation to help recognize issues where the DHRC can
and cannot be helpful.
Ms. Smith expressed the desire to put the budgeted funds to good use and stated that there should
be a report to advise Council how the funds were used to demonstrate to Council that funds were
used wisely. If mediation was not used during the year, at least there would be DHRC members who
had been trained and this would show that members were committed.
Ms. Smith questioned if any other members had an interest in attending the training, and
Mr. Henderson stated that he would be available to go.
Ms. McDowell advised members that the City Clerk’s Office has a relationship through the
Delaware Municipal Clerks Association with Ms. Fran Fletcher, from the University of Delaware
Institute for Public Administration (IPA), which is the organization that would be putting on the
mediation training. Ms. McDowell offered to contact Ms. Fletcher to see if the training could be
offered in Dover, which might reduce the expense and allow more members to participate.
Ms. McDowell offered to find out what other types of training IPA offers that might be useful for
members. She noted that IPA provides an institute for municipal clerks, a part of which includes
training provided by attorneys free of charge. Ms. McDowell suggested that such individuals may
be able to come and explain why DHRC meetings must be published, in the interest of open and
transparent government, noting that the DHRC is a subset of a municipal government. She stated
that there may be others in the State and City that could benefit from this kind of training, as well
as the DHRC.
Ms. Smith stated that she would defer scheduling the training until she heard from Ms. McDowell
regarding this possibility.
Community Involvement
Ms. Smith expressed appreciation that Ms. Stewart and Mr. Ruane attended the All Unity Day rally
held on Saturday, June 6, 2015 at Legislative Mall. Ms. Smith indicated that she thought this would
be an opportunity for DHRC members to introduce themselves; however, she was then asked to
serve as master of ceremonies for the program due to the illness of the organizer, Rev. Rita Paige.
Ms. Smith advised members that this was a good event.
Ms. Smith stated that there had been an article in the Delaware State News on June 13, 2015 about
her role as the new Chair of the DHRC.
Ms. Stewart stated that Ms. Smith did a great job speaking at the All Unity Day event.
Mr. McGiffin stated that the announcement piece in the Delaware State News where Ms. Smith was
described as the new Chair of the DHRC was also great.
Página 50
DOVER HUMAN RELATIONS COMMISSION
MEETING OF JULY 28, 2015 PAGE 5
Ms. Smith advised members that she had been approached about being a speaker at a Technology
Education and Design (TED) talk in Dover. She explained that this would involve getting a group
of approximately 100 community members together to talk about subjects that impact their lives.
Four (4) to five (5) speakers would speak for 20 minutes each. She suggested that if the DHRC and
SHRC got involved, this could be used as an opportunity to create a platform to get the community
engaged around topics that are important to members. Ms. Smith stated that an expert would be
asked to speak, and it could be someone from a university or a community leader, someone from the
local area or anywhere in the country. The DHRC would assist in partnering to promote and sponsor
the event. Ms. Smith advised members that Dr. Dan Young, who had headed up a TED program in
Wilmington, was now trying to bring this to Dover. She suggested inviting Dr. Young to a DHRC
meeting to show a video of what this program looks like to see if this would be something that
members want to engage in.
In response to Mr. Henderson’s request for clarification on TED talks, Ms. Smith stated that speakers
give motivating and inspiring speeches at these events. Ms. Smith advised members that TED talks
are videoed and had been held in different cities, noting that all such events in Wilmington had been
sold out. She felt that this program could add value and exposure to the DHRC.
Ms. Smith stated that she would invite Dr. Dan Young to the next DHRC meeting to provide
additional information about TED talks.
Ms. Smith advised members that she would be making a recommendation to the Council President
for appointments to the two (2) vacant seats on the Commission in the First and Second Districts and
asked members to let her know if they had recommendations, noting that she was looking for
diversity. She asked that they develop recommendations before the next meeting so that the DHRC
would be ready to move on those recommendations. Once the seats are filled, she suggested that a
group picture be taken of the DHRC at City Hall. Ms. Smith suggested creating awareness and a
connection by sending this picture and a congratulatory note to various members of the community,
saying that the DHRC was proud of them, with each of the Commissioners’ names and districts. She
felt this could easily be done one (1) to three (3) times per week and would not be costly. Ms. Smith
stated that she would defer this for the present until the other two (2) members are appointed and
suggested that this system could be up and running by the end of September or October.
Ms. McDowell stated that a resume and bio for the recommended appointees would need to be
provided to members of Council before Council votes on the appointments.
Publicity
In response to Ms. Smith regarding current information on the City of Dover website for the DHRC,
Ms. Denise Devine, Assistant City Clerk, advised members that there was currently no page for the
DHRC on the City’s website; however, the Photo Gallery on the home page of the City’s website
included photographs pertaining to the DHRC.
Ms. Smith advised members that this information is what appears when googling the Dover Human
Relations Commission and stated her feeling that this information was antiquated. She suggested
that it be replaced with a photo of current members, biographical information, and perhaps their
Página 51
DOVER HUMAN RELATIONS COMMISSION
MEETING OF JULY 28, 2015 PAGE 6
guiding principles or core values as a starting point. She questioned if a commitment could be made
that every member provide a photo, an abbreviated two (2) paragraph bio, and a sentence or two (2)
as to why they serve, and asked if this change to the website could be made in-house.
Members reviewed the current bios of City Council members on the City of Dover website.
Ms. Smith requested that members provide approximately two (2) paragraphs in approximately a
200-word range to the City Clerk’s Office by August 14, 2015.
Ms. McDowell indicated that the City Clerk’s Office was available to support the DHRC and could
create the DHRC’s web page if information were provided. She estimated that this could be done
within a week after receiving members information.
Ms. Smith expressed her expectation that by the third week in August members should be able to
direct people to the DHRC web page.
Commissioners (Skills, Networks, Interests)
Noting that all members were serving on committees at this time, Ms. Smith questioned if members
felt they had the passion, skill sets, and networks to execute what they had signed up to do.
Responding, Mr. Henderson stated that he feels more comfortable when there is more structure and
continuity, noting that he continued to be on a learning curve; however, he stated that he felt good
about continuing to serve on the Education Committee.
Ms. Smith stated that the Education Committee would be responsible for educating the community
and connecting the DHRC through workshops. She indicated that the TED talk discussed previously
would be part of this responsibility. Ms. Smith also suggested that the Education Committee could
decide, for example, to hold four (4) events, one (1) each quarter, choosing four (4) dates and topics
that would be presented to the Commission and then mobilized. She stated that even if one (1) event
were held, such as the TED talk, at least the community would be engaged and members would be
doing more than just attending meetings and begin to see results.
Mrs. Sadusky indicated that she was serving on the Education Committee with Mr. Henderson and
that she and Mr. Henderson had discussed presenting perhaps (2) educational events. She noted that
she is very interested in the DHRC; however, had experienced complications and time constraints.
She suggested that the TED talk might be a simple way of accomplishing something by having
someone come into the community.
Mr. Henderson stated that Mr. George Bailey, business manager at Sam’s Club, is excellent at
putting together diverse groups such as African Americans, Asian Americans, and Latin Americans.
Mr. Henderson hoped to work with Mr. Bailey and find out his resources with regard to education
and diversity. He noted that the University of Delaware also had resources.
Ms. Smith asked members to not be discouraged due to the lack of a quorum at the DHRC meeting
scheduled in June and the resignation of members. She stated that it is not about who is not present,
it is about who is present and ready to do the work. Ms. Smith explained that she was ready to move
Página 52
DOVER HUMAN RELATIONS COMMISSION
MEETING OF JULY 28, 2015 PAGE 7
forward and every meeting would have goals and dates. She indicated that Commissioner Wilson
did a superb job putting together infrastructure and now it is time to mobilize it. Ms. Smith felt that
the Commission had done much strategic planning but had forgotten to look at the basics, including
the skill sets, networks and interests of members which were underutilized. Ms. Smith suggested
that the Commission have a session focusing on contacts, such as those in churches, fraternities,
boards, and organizations, for example, the Women in Leadership Council and the United Way,
noting that Mr. John Moore, Vice President, Resource Development and Strategic Partnerships for
the United is in Dover. She felt that members could develop ideas on tapping into networks and this
would allow the DHRC to partner with other organizations that share concerns about diversity to put
on educational events. She noted that the SHRC has offices in Kent, Sussex, and New Castle
counties, including one (1) in Dover, and has a responsibility for this area. She indicated that United
Way should be at the table because they operate throughout the entire State and have many events
in Wilmington but not in the local area. She felt that putting on these events would be as valuable
to other organizations as they would to the DHRC.
Mr. Henderson stated that he had heard more about limitations for the DHRC than possibilities,
noting that the DHRC was unable to discuss complaints or gather together as a group. Responding,
Mrs. McDowell advised members that since there were currently seven (7) members appointed, no
more than three (3) members could meet without it being a published meeting.
Responding to Mr. McGiffin, Ms. McDowell confirmed that when the two (2) vacancies on the
Commission are filled, the number of members that could gather, other than in a public meeting,
would increase.
Bylaws
Ms. Smith stated that she had read through Chapter 58 - Human Relations - of the Dover Code
several times. She indicated that it contained great information on the purpose of the Commission
and encouraged all members to read it.
Commissioners’ Announcements
There were no members wishing to make announcements.
Mr. McGiffin moved for adjournment, seconded by Ms. Stewart and unanimously carried.
Meeting adjourned at 6:26 p.m.
S. Renee Smith
Chairwoman
SRS/TM/js/dd
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Misc-Minutes\HUMAN RELATIONS COMMISSION\2015\07-28-2015 Dover Human Relations Commission.wpd
Attachments
Attachment #1 - City of Dover Human Relations Commission Budget Request
Attachment #2 - Flyer - University of Delaware - Four-Day Basic Mediation Training
Página 53
ATTACHMENT #1
DHRC Meeting of 07/28/2015
CITY OF DOVER
HUMAN RELATIONS COMMISSION
BUDGET REQUEST
FY 2016 BUDGET SUMMARY - The Fiscal Year (FY) 2016 budget submission request from
the Hum an Relations Commission sustains the alignment of priorities for the City of Dover
to maintain, protect, and improve the quality oflife and rights of all its citizens through
engagement, awareness and education.
A request of $5000 assists the Commission in building its mission to strengthen its
credibility and community relationships through development training, establishing
partnerships, one-on-one contact, marketing, and educational forums. Additionally, the
Commission is currently working with the city to assess its diversity practices. The
continuation of this process may require additional professional assistance for research.
The proposed budget request supports the following :
Commissioner Conflict Resolution $1500
Development Training
Social Media Development $1000
Educational Forums for Constituents ,. $ 500
Marketing Materials $1000
Professional Assistance for Research $1000
Please Note: All costs are approximate only.
Página 54
Subject: Fwd: UD's Basic Mediation Training October 2015
Calvin,
Below is information about the mediation course staff and commissioners took several years ago. Please feel free to forward to
S. Renee.
Regards,
Romona
Romona Fullman
Begin forwarded message:
From: Fran Fletcher <franf@u<lcl edu>
Date: June 10, 2015 at 9:00:09 AM EDT
To: <rornona. ful Irnan(rustate.de. us>
Subject: UD's Basic Mediation Training October 2015
Reply-To: Fran Fletcher <fran f:fD udc I.ed u>
ATTACHMENT #2
Email not displaying correctly? DHRC Meeting of 07/28/2015
Four-Day Basic Mediation Training
October 6-7 & 13-14, 2015
9:00 a.m. - 4:00 p.m.
Buena Vista Conference Center, New Castle, Delaware
'Ibis four-day workshop is taught by highly skilled and experienced mediators, active in the dispute resolution field, and
committed to best practices and continuing education. In addition, it is supported by a diverse group of professional
mediators who serve as coaches and provide feedback to support and facilitate learning, including directors of volunteer
mediation programs who are available to explain volunteer mediation opportunities in Delaware.
In Four Days You Will ...
• Gain a comprehensive introduction into the field of mediation and alternative dispute resolution methods;
• Learn a six-step facilitative mediation process;
• Understand the role and responsibilities of a mediator;
• Practice co-mediating disputes that lend themselves to a non-legal resolution process;
• Learn and practice facilitative mediation principles of self-determination, empowerment, and confidentiality
through active listening, questioning, re-framing, and neutral language; and
Página 55
• Exercise impartiality.
To register. visit Jlttps://commerce.cashnet.com/UDELIPCR
Registration deadline: September I
For more information, visit our events page:
:www.ipa.udel.edu/crp/trainingandevents,html.
Thank you.
Fran Fletcher
Conflict Resolution Program
Institute for Public Administration
School of Public Policy and Administration
University of Delaware
302-83 1-6812
Bookmark Us. Llke Us. Follow Us.
Visit our website for mor~ info on !PA Like us on Facebook to find out what's Follow us on :rwilt4;J'. for updates on
and its upcoming events . happening with IPA. current I PA news.
Página 56
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
The Safety Advisory and Transportation Committee Meeting was held on August 25, 2015,
at 4:00 p.m. with Chairman Hosfelt presiding. Members present were Mr. Hutchison,
Mr. Sudler (arrived at 4:09 p.m.), Mr. Keller, and Mr. Shelton. Members of Council present were
Mr. Anderson and Mr. Cole (arrived at 4:09 p.m.). Mayor Christiansen (departed at 4:41 p.m. and returned
at 4:55 p.m.) was also present.
AGENDA ADDITIONS/DELETIONS
Mr. Hutchison moved for approval of the agenda, seconded by Mr. Keller and unanimously
carried.
Concerns of Owens Manor Residents
By unanimous consent, this item was deferred until later in the meeting.
Discussion - Increased Criminal Activity - Dover Park/Silver Lake Park (Deferred during the
meeting of June 22, 2015)
Police Chief Paul Bernat advised members that he reviewed records pertaining to calls for service
for Dover Park and Silver Lake Park for 2013, 2014, and January 1 through August 12, 2015. He
advised members that, excluding calls related to opening and closing of park gates, there were 35
complaints related to Silver Lake in 2013, 26 in 2014, and 18 to date in 2015. Chief Bernat
questioned if members were interested in particular types of complaints.
Responding, Mr. Anderson stated that people did not seem to have complaints regarding daytime
use, but concerns were expressed by those exercising in the park in the evening, close to the park’s
closing time near dusk. He indicated that there were complaints about activity in the woods, people
sleeping in the park, and suspected drug activity.
Mr. Anderson indicated the need for the City to stay ahead of the curve so that crime does not start
relocating to the parks as it is moved from neighborhoods. He felt that the parks are great places for
families in the City; however, he noted that there had been a shooting at Dover Park during the past
couple of weeks. Mr. Anderson felt that there was a lack of security due to people going back and
forth between the neighboring areas of the park and using the park to hide out. He indicated that
there were not significant barriers to this activity, noting issues related to vegetation on some of the
trails, lack of lighting, etc.
Responding, Chief Bernat stated that the Police Department contacted Ms. Sharon Duca, Public
Works Director, and that a Public Works crew significantly cleaned up the east side of Silver Lake,
which looked a lot better now. He indicated that previously this area had been overgrown worse than
he had seen during his 39 years in Delaware. Mr. Anderson expressed thanks for these efforts.
Chief Bernat expressed his opinion that environmental design is the best crime prevention. He stated
that trashy areas invite people to do seedy things, whereas nice areas are more likely to have people
there for the proper reasons. Chief Bernat stated that, due to the concerns expressed, the Police
Department had picked up enforcement efforts and patrols. He stated that all six (6) police cadets
are now bike trained, and three (3) of them ride in this area quite a bit. Chief Bernat stated that these
cadets had been very well received.
Página 57
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF AUGUST 24, 2015 PAGE 2
Mr. Anderson stated his impression that there had been an improvement in the atmosphere at Silver
Lake since the issue first came up approximately a month-and-a-half ago, and expressed his hope
that this would occur soon at Dover Park.
Chief Bernat stated that prior years reports from Dover Park revealed seven (7) complaints and 12
complaints. He noted that there have been 21 complaints in 2015, so there was an uptake in this
area. He explained that patrols there had also been increased; however, it was harder for cadets to
get across the highway to this area. Chief Bernat stated that this was usually a good spot for the K-9
officers to patrol at night.
Mr. Hosfelt inquired if there was a specific type of complaint that appeared to be the number one (1)
concern. Responding, Chief Bernat stated that most were suspicious events, which were probably
called in and could be related to a variety of issues, such as two (2) to four (4) people in a vehicle,
possibly smoking a cigarette or a marijuana cigarette, or somebody walking in the park after dark.
Chief Bernat advised members that in 2015, six (6) of the 18 incidents were proactive police stops,
which indicated that the Police Department was doing its job. He stated that there had been
disorderly conduct incidents and a psychiatric incident with a mental patient. In addition, there were
a couple of personal items found, a parking violation, a medical incident, and a fight, but no major
incidents.
Mr. Hutchison noted that previously the gate had been locked at night and questioned if this was still
being done. In response, Chief Bernat indicated that he discovered that this was not being done as
much as it had been in the past. It was his feeling that staff should continue to lock the gate and the
Department would keep an eye on this. Chief Bernat stated that sometimes officers get
overwhelmed, noting that they may be doing other things that have more precedence than shutting
a park gate.
Based on the number of complaints received, Mr. Hutchison felt that locking the gate was not
justified as long as patrols were increased and the cadets were being used in the area. Responding,
Chief Bernat felt that this was a good point, noting that not locking the gate would allow officers to
go in and make sure there was no one in violation, noting that there were large signs stating that the
park is open from dawn to dusk.
Mr. Shelton asked if K-9 units were getting out of the vehicles or just driving through the areas. In
response, Chief Bernat stated that, as a former K-9 officer, he would get out of his vehicle in the
parks because it was a good time for his dog to relieve itself in the wooded areas. He also noted that
this allowed people present to see that the officer would actually get out of the vehicle and if they
were doing anything seedy, they would not want to stay around. Chief Bernat stated that he would
reiterate this to the K-9 officers.
Referring to the excerpt of the minutes of the Parks, Recreation, and Community Enhancement
Committee meeting of June 8, 2015, Mr. Hosfelt noted that there had been questions about grants
for police patrols. Mr. Hosfelt questioned if extra-duty hours were being used for patrols or if they
were based on the regular schedule. Responding, Chief Bernat stated that currently all foot patrol
grants were based upon violent crime, and staff was not really seeing violent crime in that area.
Página 58
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF AUGUST 24, 2015 PAGE 3
Mr. Anderson questioned if Department of Justice and Homeland Security grants were being looked
at as part of the City’s camera footprint. In response, Chief Bernat stated that camera efforts were
now being concentrated in the downtown area. He noted that there were currently 71 cameras
downtown, and an additional 14 had been requested through an open grant, which would bring the
total to 85. Chief Bernat stated that the Police Department had experienced great success with the
cameras, noting that two (2) homicides had been solved with them. He stated that he would love to
put cameras in other areas, and he would also like to have foot patrols in the downtown area. He
indicated that there were more pressing matters; however, it was his goal to make these things
happen eventually.
Concerns of Owens Manor Residents
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that the City had received complaints from time to time from residents of Owens Manor and other
Dover Housing Authority (DHA) properties. She noted that some complaints came through Senator
Brian Bushweller's office, and that office was also following up with staff on those complaints.
Mrs. Townshend explained that staff had a productive meeting with the DHA on July 23, 2015 and
she felt there was good resolution, as reflected in the correspondence between herself and
Ms. Ami Sebastian-Hauer, Executive Director, Dover Housing Authority.
Mrs. Townshend explained that DHA is the property manager for Owens Manor, which is owned
by the Delaware Community Investment Corporation and Great Lakes Capital Fund. She noted that
there are some issues with the ground settling, which are causing several areas of the building to
separate. Mrs. Townshend stated that a structural report identified the issues, but the problem could
not be fixed until geotechnical work was done in the Spring of 2015. She indicated that DHA was
working with their consultants to obtain a design for what needed to be done to address the issue so
they can make the necessary repairs. At the meeting, it was agreed that DHA would provide staff
with a timeline on when these things were expected to occur. Mrs. Townshend stated that the issue
was slow settlement and separation that needed to be corrected so that it does not get worse, rather
than something that was expected to fall down. She expressed her opinion that the structural
engineers would have made it known if there was an imminent danger. Mrs. Townshend indicated
that a number of issues were brought forward, such as the condition of carpets and the sprinkler,
which were noted in the City’s inspection report, as well as issues that the City was not involved in,
such as cable TV service. She advised members that most of the repairs had been made and the
DHA was in the process of getting a quote on the carpets and scheduling that work, which should
be done in the near future.
Mrs. Townshend stated that the bedbug issue was a tough situation. She explained that routine
bedbug inspections and treatments are performed, and there are procedures involved, such as
removal of the furniture and several treatments when needed. Mrs. Townshend stated that part of
the challenge is that when furniture is placed near the dumpsters, other residents may see a nice new
couch and take it in. She advised members that DHA is keenly aware of the bedbug issue and was
working on treatment, but cooperation was needed from the residents in not bringing discarded items
back in.
Página 59
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF AUGUST 24, 2015 PAGE 4
Mrs. Townshend informed members that complaints had been received about people being told they
had to pay by money order. She explained that this was not a routine requirement, but money orders
are required when the payer’s check has bounced or if the individual was going to court.
Mrs. Townshend stated other ways to work with residents were discussed, because DHA does not
have a full-time site manager to make sure that rents are recorded when they are turned in.
Mrs. Townshend reiterated that the meeting had been productive, communication had remained
open, and the repairs were being made.
In response to Mr. Hosfelt, Ms. Ami Sebastian-Hauer, Executive Director, Dover Housing Authority,
76 Stevenson Drive, stated that Ms. Townshend had summarized everything and she had no
additional comments or concerns.
Mr. Sudler stated that, as a landlord, he had dealt with bedbugs and they are a problem. He
questioned whether DHA had thought about trying to isolate affected items by immediately getting
rid of or bagging them. Responding, Ms. Sebastian-Hauer stated that their bedbug procedure had
expanded and in the last couple of weeks they had inspected every single unit at Owens Manor and
Queen Manor. A maintenance person had been assigned to the exterminator and the day before an
inspection, they go in and help tenants prepare by bagging up all of their bedding and clothing and
helping to move mattresses, pictures, etc. She explained that tenants are asked to cooperate and to
discard their personal items and, although some items are sentimental and tenants do not want to get
rid of them, staff just explains to them about the bedbug issue.
Referring to the bedbug issue, Mr. Keller asked if there had been incidences of residents being bitten
or having to seek medical help. Responding, Ms. Sebastian-Hauer stated that this had unfortunately
occurred, noting that staff has found out about the bedbugs after this happens. She advised members
that DHA found a number of units that were infested that had not been reported to them.
Ms. Sebastian-Hauer reiterated that tenant cooperation is very important, and tenants are asked to
report bedbugs to management; however, if they do not and it gets to the point where they have to
dispose of all of their items and they have been bitten, DHA will step in, call their emergency
contact, and have client services come in. She indicated that tenants’ failure to come forward
regarding the issue is a problem.
Responding to Mr. Hutchison, Ms. Sebastian-Hauer stated that Owens Manor has 60 units. She
explained that every single unit was inspected in one (1) day and a list was maintained of those units
that were infested and those that were not. Infested units received immediate treatment that same
day and were placed on a three (3) treatment cycle. She stated her belief that the next treatment was
scheduled for Thursday, August 27, 2015.
Mr. Hutchison questioned if this was the recommended approach, suggesting that one would think
that everything would have to be treated, infested or not. Responding, Ms. Sebastian-Hauer stated
that the infested unit and the two (1) adjacent units are treated. She noted that the problem was bad
on the fourth floor and bedbugs were seen in the hallways. At that point, the entire end of the fourth
floor was treated, and people came in and helped to vacuum and perform the second half of the
treatment.
Página 60
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF AUGUST 24, 2015 PAGE 5
In response to Mr. Keller as to whether the Board of Health had addressed this situation,
Ms. Sebastian-Hauer stated that they had not.
Responding to Mr. Sudler regarding whether money order payments are required only for residents
who had been delinquent, Mrs. Sebastian-Hauer stated that DHA does not accept cash but will accept
personal checks and money orders. Money orders are required if the tenant has had a check bounce
or if their case has been filed in court and they want their case dismissed.
Mr. Shelton inquired if it was possible to destroy furniture that is put outside rather than having
tenants bring it back in. In response, Ms. Sebastian-Hauer stated that this was being done now, and
all tenants had been asked to schedule an inspection with staff before bringing things into the
buildings. In response to how this was enforced, she stated that DHA had a list of all units that are
bedbug free, and if one (1) of those units ends up with bedbugs, it would then be known that the
tenant brought something in.
Mr. Keller asked if furniture placed outside was subject to the elements, such as rain, and
Mrs. Sebastian-Hauer stated that it was and that these items are set out for trash pickup.
Mr. Anderson noted that other concerns had been expressed, such as a lack of railings in the
building, and requested an update on the progress. Responding, Ms. Sebastian-Hauer stated that any
major work undertaken at Owens Manor must have approval from Delaware State Housing Authority
(DSHA) and the limited partner, who are the 99% owners of Owens Manor. She noted that DHA
was obtaining cost estimates, which they will submit to DSHA and Delaware Community Investment
Corporation and Great Lakes Capital Fund.
Mr. Anderson stated that there had been complaints about the system for visitor parking and inquired
if there was a way to address this. Mrs. Sebastian-Hauer stated that there was very limited parking
at Owens Manor and Queen Manor, noting that when they were built, a request was submitted to the
City for a waiver on the number of parking spaces. She advised members that, at the request of the
residents of both Owens Manor and Queen Manor, a parking tag policy was implemented. Those
who had cars were able to obtain a parking tag that allowed them to park in the parking lot.
Mrs. Sebastian-Hauer explained that reasonable accommodations were made for a couple of the
tenants and reserved parking was provided for the nurse’s aides and Meals on Wheels providers. For
the convenience of tenants, other visitors have to park on the street and Ms. Sebastian-Hauer felt that
there was probably nothing else that could be done in this regard.
Mr. Anderson questioned if security cameras would be placed back at Owens Manor. Responding,
Ms. Sebastian-Hauer indicated that new cameras had been purchased and would be installed.
Ms. Sebastian-Hauer advised members that DHA was trying to make progress, and Mr. Anderson
stated that it sounded like real progress was being made.
In response to Mr. Keller, Ms. Sebastian-Hauer stated that one (1) parking space is allotted per
apartment and a number of tenants do not have cars.
Página 61
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF AUGUST 24, 2015 PAGE 6
In response to Mr. Sudler regarding the definition of the geotechnical work referenced previously,
Mrs. Townshend explained that a number of soil borings were done to determine the compaction and
strength of the soil where the building was placed so that planning can be done for the repairs needed
to fix the settlement issue. She indicated that this would involve digging into the ground to see what
the soil horizon is.
Mr. Sudler asked if material would be placed to keep the soil from shifting. Responding,
Mrs. Townshend stated that the study had been done, which provided soil borings to look at the
cross-sections of what is under the ground. The next phase would be to design the repairs, noting
that repairs would be extensive and involve jacking up the building.
In response to Mr. Sudler regarding where they were in the geotechnical process,
Mrs. Sebastian-Hauer stated that they were working with the structural engineer. Mrs. Townshend
and Ms. Sebastian-Hauer were unsure which engineer was assisting.
Responding to Mr. Sudler, Mrs. Townshend explained that the sprinkler issue mentioned previously
was not for the sprinkler system but related to repairs needed in the sprinkler room, since there had
been a leak that resulted in some rotted wood which needed repair. She stated that those repairs had
been made.
In response to Mr. Keller regarding the cost of the geotechnical work, Mrs. Townshend advised
members that this was being handled by the DHA and the ownership partners, who would also make
decisions regarding what to do with it.
Overview of Dover Police Department Policy Regarding Contact, Arrest, or Detainment of
Undocumented or Illegal Aliens
Chairman Hosfelt stated that he had asked that this item be placed on the agenda, due to recent
national attention regarding a horrific homicide in San Francisco, California, allegedly committed
by an undocumented immigrant. Mr. Hosfelt wanted to make sure that the public had knowledge
of where the Dover Police Department and the City of Dover stood in regard to this issue.
Police Chief Paul Bernat stated that Dover Police Department Procedural Notice 4.1.1 - Foreign
Nationals, Diplomats and U.S. Immunity provides guidelines related to illegal aliens. He reviewed
Section II - Guidelines, Illegal Aliens, explaining that the Dover Police Department contacts U.S.
Immigration and Custom Enforcement (ICE) for three (3) reasons: 1) if the alien is a re-entry; 2) if
the alien is in possession of a fraudulent Green Card, Social Security number, or Social Security
card; and 3) if an legal or illegal alien is arrested for a felony crime.
Chief Bernat stated that Section III - Procedure outlines the procedure for these situations, noting that
ICE will not respond directly to the Department unless circumstances are extremely unusual, but will
provide guidance and advice. If circumstances fit the proper criteria, ICE will do the follow-up work
as soon as possible. Chief Bernat stated that any problems or questions that arise would be directed
to the Department of Immigration, and the City liaison is the Criminal Investigation (CI) sergeant.
Página 62
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF AUGUST 24, 2015 PAGE 7
Chief Bernat advised members that Dover is not a sanctuary city; however, Baltimore, Philadelphia,
Jersey City, and New York City are sanctuary cities in this area. He explained that there are 31
sanctuary cities in the United States, including San Francisco. Illegal aliens are safe and will not be
deported in sanctuary cities. Chief Bernat indicated that the Dover Police Department will do
anything they can to have an individual deported if they find they are illegal.
Mr. Hosfelt stated that the individual in San Francisco was a seven (7) time convicted felon who had
been deported five (5) times. He questioned if this individual came into the custody of the Dover
Police Department and ICE issued a detainer or wanted this individual when released from the
Department’s custody, whether the individual would be released or turned over to ICE. Responding,
Chief Bernat indicated that the individual would be turned over to ICE or placed in the Department
of Corrections (DOC) until ICE could pick the individual up. He stated that the Dover Police
Department would do everything they could legally within their bounds, reiterating that Dover is not
a sanctuary city.
Mr. Sudler questioned how many illegal immigrants had been deported or transferred to ICE within
the last three (3) years. In response, Chief Bernat indicated that he had checked with the Delaware
Criminal Justice Information System (DELJIS) and they were unable to provide this information.
He also checked with ICE and the individual responsible for this information was on bereavement
leave. Chief Bernat advised members that he was in his 27th year of service and could not remember
that the Department had deported anyone, although he was sure that it had happened.
Mr. Sudler requested that this information be submitted to the Committee once it is obtained.
Mr. Anderson thanked Mr. Hosfelt for the related groundwork that was done during his service as
Chief of Police, for continuing to assist Chief Bernat, and for covering this issue. He reminded
members that the Dover community had suffered a loss in 2007 when some Delaware State
University students were killed in Jersey City, which is a sanctuary city, by someone who had been
convicted of violent crimes, should have been deported, and had been in the country approximately
three (3) times. Mr. Anderson stated the importance of those in the community cooperating with
federal law enforcement in this area, as they do with the FBI and other organizations, and in tracking
crimes.
Mr. Anderson stated his understanding that the discussion was not about going after particular
groups of people but applying existing procedures to everyone and using all resources available to
check all federal records. Chief Bernat agreed and indicated that an inability to speak English would
be one (1) clue and would be a reason to ask for a Green Card and paperwork.
Mr. Anderson noted that any individual would be asked to produce an ID, and an illegal individual
may not be able to produce one. Chief Bernat explained that there would have to be a reason for the
police to stop or encounter the individual and officers do not go looking for illegal aliens.
Página 63
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF AUGUST 24, 2015 PAGE 8
Mr. Anderson questioned the City’s position on Senate Bill (SB) 59, sponsored by Senator
Bryan Townsend, which could potentially make Delaware a sanctuary state, and whether
Chief Bernat saw this as an infringement on local federal law enforcement. Responding,
Chief Bernat indicated that if he were asked, he would say that he was not interested in being a
sanctuary city.
Debriefing/Post-Mortem on Firefly Music Festival (Presentations by the Department of
Planning and Inspections and the Dover Police Department and Summary of Discussion with
Representatives from Persimmon Park Place, Wild Meadows, and Residents on Persimmon Tree
Lane)
Police Chief Paul Bernat reviewed a presentation entitled “Special Preparation Instructions &
Debriefing/Post-Mortem on Firefly Music Festival” dated August 24, 2015. He advised members
that the Firefly Music Festival was held June 18-21, 2015 at Dover International Speedway and was
very successful, with over 78 bands performing and close to 90,000 attendees. Chief Bernat
reviewed the Dover Police Mission Statement During Firefly and the Dover Police Objectives
During Firefly.
Chief Bernat felt that bringing fans into the event went much better than in the past, noting that
breaking the festival up over four (4) days instead of three (3) helped tremendously. He explained
that monthly meetings were held through the entire year with Dover International Speedway Security
in regard to the Firefly Music Festival, Big Barrel Country Music Festival, and two (2) NASCAR
races, including one (1) that is always held during the first weekend in June and another to be held
in October. Chief Bernat advised members that officers are given strict instructions to operate within
the National Incident Management System (NIMS) and operations are NIMS compliant. In
reviewing the map of the Woodlands at Dover Downs, Chief Bernat explained that the two (2) main
stages, one (1) at the very top of the map and one (1) just to the right of that stage, were in the
jurisdiction of the Delaware State Police, and the Dover Police Department assisted them in that
area. He indicated that there were several additional stages in the area at the bottom of the map that
were in the City’s jurisdiction.
Chief Bernat reviewed the Grid Map, explaining that Districts 1 and 2 were in the City’s jurisdiction
and part of District 2 and all of District 3 were managed by the Delaware State Police. He indicated
that during the load-in on Wednesday, June 17, 2015, there was a large number of campers, mostly
tents. Chief Bernat noted that Lot 18, off Persimmon Tree Lane, was in the Delaware State Police’s
jurisdiction. He advised members that there was severe weather on Saturday, the third day of the
event, and there was an evacuation that went very smoothly, considering the amount of people.
Sunday was the final day of the festival and crowds were huge.
Chief Bernat estimated that 16 police agencies were involved that had the same basic mission: to
manage the people, traffic, and safety aspects. He emphasized that an extra 90,000 to 95,000 people
could not come to the City with the aid of only the Dover Police Department’s authorized strength
of 101 officers and true strength of 92, counting the five (5) recruits that just came out of the
Delaware State Police Academy.
Página 64
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF AUGUST 24, 2015 PAGE 9
Chief Bernat reviewed the Calls for Service, including 64 total complaints, six (6) arrests, and 29
charges. He explained that there were three (3) Megan’s Law Notifications involving three (3)
workers who were sex offenders who are required to register when they come into a town, and the
officers made sure that all of the appropriate steps were taken.
Chief Bernat stated that a total of 3,378 extra duty man hours were used. He noted that there were
several items to be addressed for improvement for the 2016 Firefly Festival; however, from a public
safety standpoint and considering the size of the event, the 2015 Firefly Music Festival did not have
any major issues.
Chief Bernat advised members that the Big Barrel Country Music Festival was also a success. He
noted that this Festival only used the two (2) stages which are in the jurisdiction of the Delaware
State Police, so the Dover Police Department had minimal responsibility with regard to security, but
had a lot of extra duty for traffic and things of that nature. Chief Bernat reminded members that
officers worked a three (3) day weekend for the NASCAR race, immediately followed by a four (4)
day weekend for Firefly, and the Big Barrel event was held the next weekend. Officers were
extremely busy during this time and were not allowed to take vacations, except for life events, such
as having a baby, graduation, etc. Chief Bernat expressed pride in the Department, noting that
officers did everything that they were supposed to do.
Chairman Hosfelt stated, for the record, that he is employed full time as the security manager for
Dover International Speedway; therefore, he could speak to this subject with some knowledge. He
expressed appreciation for Chief Bernat’s report, indicating that it was very well done. He stated that
on Saturday night of the Firefly Festival, when the evacuation was done, there had been over
10 inches of rain in a 19-day span, and things were not looking very good, with storms coming across
the bay. He indicated that Mr. Clement, Dover International Speedway staff meteorologist, and Red
Frog Events, the promoter, made the decision to evacuate. With the help of the Dover Police
Department, Delaware State Police, the Delaware Department of Transportation (DelDOT), Dover
International Speedway security, and everyone else working in conjunction, about 70,000 to 75,000
individuals were evacuated in less than an hour. Mr. Hosfelt attributed this to the planning that is
done on a monthly basis, noting that meetings had begun to plan for next year less than 1½ - two (2)
weeks after the festival, and this is a constant planning process. Reiterating that District 3 had been
in the jurisdiction of the Delaware State Police, Mr. Hosfelt stated that annexation of that land into
the City was being looked at and anticipated that this would happen at some point this year. He
expressed his belief that when these festivals come next year, that entire responsibility will be that
of the Dover Police Department, with the help of Delmar, Seaford, Cheswold, and Clayton, who he
stated were all amazing and had done a great job.
Mr. Hutchison expressed pride in the Dover police and all the agencies that worked with them, as
well as Dover International Speedway. He felt that others have no idea of the amount of energy that
goes into this throughout the whole year to be able to make this happen. Mr. Hutchison felt that
there was no other event in the State of Delaware that brings in this number of people, noting that
it required training, planning, years of hard work, and reevaluating what is done each year. He stated
that this was a great event and the City, Kent County, and the State all benefit from it.
Página 65
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF AUGUST 24, 2015 PAGE 10
Mr. Keller echoed Mr. Hutchison’s comments, noting that he had spoken to a lot of the residents in
the area and there were hardly any complaints. He conveyed kudos to all, stating that they had done
a remarkable job.
Mr. Sudler inquired how many officers it took to secure the event as a whole. Responding,
Chief Bernat stated that this number varied by day and time of day.
Mr. Hosfelt stated that on any given day, approximately 750 to 800 security officers are employed
at the location and about 250 law enforcement personnel, noting that this would not include
Emergency Medical Services (EMS) and firefighters.
Mr. Hosfelt informed members that he and Councilman Neil had hosted a discussion with
representatives from Persimmon Park Place and Wild Meadows and residents on Persimmon Tree
Lane regarding their concerns about the festivals. Mr. Hosfelt stated that those concerns were
addressed and had been forwarded to Red Frog Events for discussion.
Prioritization of City of Dover State Capital Transportation Program (CTP) Projects
Mrs. Ann Marie Townshend, Director of Planning and Community Development, advised members
that each year City Council develops a list of transportation priorities and shares these priorities with
the Secretary of Transportation for consideration as the Delaware Department of Transportation
(DelDOT) develops the State's Capital Transportation Plan (CTP), and this list is also shared with
the City’s legislative delegation. She indicated that in the past staff had looked at additional needs
and projects; however, during the past few years, due to limited funding, the City’s approach was
to review the ranking of the previously prioritized projects. Mrs. Townshend stated that the current
priority list was developed by herself; Mr. Scott Koenig, City Manager; Mrs. Sharon Duca, Public
Works Manager; and Mr. Bill Neaton, Economic Development Manager. She explained that they
reviewed the priorities approved by City Council in September 2014, and recommended the
following priority ranking for the coming year:
1. Construction of Sidewalks within the Walk Zone of the New Dover High
School - Now that the Dover High School has been operational for a full
school year, the critical sidewalk gaps that were identified in the Dover High
Pedestrian Study performed by the Dover/Kent County Metropolitan
Planning Organization (MPO) continue to be a high priority. The critical
gaps that are of highest priority to the City and most critical in providing safe
access to the school are Mifflin Road and the south side of Route 8 west of
Mifflin Road.
Mrs. Townshend explained that students are routinely seen walking on the shoulder
and in the turn lane of Route 8, especially on the south side, between Dover High
School and Mifflin Road, as well as in these areas on Mifflin Road. While there was
currently no funding in place for this project, she indicated that the City believed that
this was a safety issue that must be addressed. Mrs. Townshend advised members
Página 66
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF AUGUST 24, 2015 PAGE 11
that students can be seen walking in these areas during the week before and after
school, and since students are leaving later due to fall sports, a lot of them are
walking at dusk when the setting sun is a real concern.
Mrs. Townshend advised members that she, along with DelDOT staff, the
Metropolitan Planning Organization (MPO), and staff from the Federal Highway
Administration (FHA), did a bicycle and pedestrian assessment of Route 8 from
Route 13 to the City limit, and all of those who were part of that assessment had
significant concerns about this area. Mrs. Townshend felt it very important to
continue to impress on DelDOT not to wait until a child is hit to deal with this
problem. She stated the need to be very aware and continue to advocate with State
legislators and to have the Capital School District and DelDOT join with the City on
this issue. Mrs. Townshend noted that she observed five (5) students walking in the
shoulder in the short period of time that she was driving west while taking her son
to school earlier in the day, and that there are many more students there in the
afternoon. Reiterating that there was no funding for the project, Mrs. Townshend
stated that sometimes money just has to be found, and she felt that this was one (1)
of those times.
2. Kenton Road Corridor Upgrades - Upgrading Kenton Road, including the
addition of sidewalks along the road, continues to be a priority for the City.
This project is currently in the CTP.
Mrs. Townshend explained that upgrades to the Kenton Road corridor had become
more important since there was more activity in the area resulting from the new
Dover High School and since the YMCA purchased the Kent Swim Club. She
indicated that a study had been done of this area several years ago. Mrs. Townshend
stated that the design and ultimate construction of the project was in the current CTP
and would be a five (5) year process involving the travel surface as well as shoulders
and sidewalks. She noted that in recent years some projects had been dropped from
the CTP and she felt the City should keep an eye on this project.
3. Loockerman Street/Forest Street Improvements - This project has been a
priority for the City to help spur redevelopment and improved traffic flow on
the west side of Dover. It was initially identified in the West Side
Redevelopment study performed in 2001. This project is currently funded in
the CTP. With the Downtown Development District Program, the
implementation of this project is a priority for the City.
Mrs. Townshend stated that these improvements related to a spot where there were
five (5) points in an intersection and expressed the need to make sure this project
stays in the CTP.
Página 67
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF AUGUST 24, 2015 PAGE 12
4. Garrison Oak Connector Road - Due to the increased activity and interest in
the Garrison Oak Technical Park, the planning and construction of this
connection to Delaware Route 1 is increasingly important. This project is not
currently in the CTP.
Mrs. Townshend reminded members that the City had made an investment in the
infrastructure within the Garrison Oak Technical Park and stated the need to continue
to reiterate to DelDOT the importance of this road as the connection from the
Garrison Oak Technical Park to Route 1, since there will not be a White Oak Road
interchange. She noted that this service road would extend from Garrison Oak along
Route 1 and down to the Route 8 interchange.
5. College Road Corridor Upgrades - This project is intended to upgrade
College Road to include sidewalks and other road improvements. This project
is not currently in the CTP.
Mrs. Townshend stated that the MPO had done a pedestrian study for Delaware State
University (DSU) that involved College Road, particularly the University Courtyard
Apartments and the walking path. She noted that a number of improvements were
needed for College Road; however, there was no current funding for it, and staff felt
it important to rank highly those projects that have funding to ensure that funding
stays intact. Mrs. Townshend stated that this project was a real priority and College
Road needed the investment.
6. Route 8/Hazlettville Road Connector - This is planned to be a north/south
access road that was identified in the Delaware 8 Concept Plan and
Operations Study. With the construction of the new Dover High School, the
construction of this connection is important to providing access to the school
without causing additional burden on other roads in the area. This project is
not currently in the CTP.
Mrs. Townshend explained that this road would extend from Dover High Drive
through the Papen Farm along the west side of the Village of Cannon Mill to
Hazlettville Road, so that all of the traffic from the south would not be going through
Artis Drive and Mifflin Road, which already have traffic issues. Part of the need was
also related to an interconnection point between Dover High Drive and Cannon Mill,
which had not opened yet so cut-through traffic could not currently be evaluated.
Mrs. Townshend advised members that, surprisingly, school traffic had not been as
bad as anticipated. She felt that this project should be monitored, noting that from
a long-term perspective the connection would be needed, but it was not as high of a
priority as items 1 through 5 on the list. Mrs. Townshend stated that this item had
higher priority in prior years.
Página 68
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF AUGUST 24, 2015 PAGE 13
7. Crawford Carroll Avenue Extension - The extension of Crawford Carroll
Avenue south toward the DSU campus becomes a more critical priority with
DSU’s lease of the Sheraton Hotel property. The extension of Crawford
Carroll Avenue will help avoid use of US Route 13 for local trips between
the Sheraton property and the DSU campus. This project is included in the
CTP.
Mrs. Townshend explained that in order to get from the former Sheraton Hotel to the
DSU campus proper, it is necessary to go out on Route 13. With legislative support,
sidewalks were installed so there was a safe way to walk, but there was still a need
for a non-Route 13 connection. Mrs. Townshend noted that if DSU were to move
forward with building a convocation center, it was possible that they may need to
build this road; therefore, it may not end up being a State-paid road.
8. Kings Highway/Route 13 Intersection Improvements - The intersection of
Kings Highway, US Route 13, and White Oak Road needs improvement to
meet an acceptable level of service standard. The current condition of the
intersection hinders redevelopment of properties in this vicinity. This project
is not in the CTP.
Mrs. Townshend explained that this intersection, near Dunkin’ Donuts, had problems
with its geometry and was failing. She noted that the ranking for this project had
dropped down a bit on the list, primarily because the City was in the process of a
Transportation Improvement District (TID) study and modeling was currently
underway for that. Mrs. Townshend stated that all improvements necessary along the
Route 13 and Bay Road corridor would be covered under the TID study. This would
not guarantee funding but, according to State law, once that study is complete and the
TID agreement is signed, a fee would be collected and those road improvements
would need to have a different priority in the State’s CTP.
9. US Route 13 Service Road Corridor - The construction of service roads along
US Route 13 is a project that will help to alleviate congestion on Route 13.
This project is not in the CTP.
Mrs. Townshend stated that this is an off-road system, mainly behind the Dover
International Speedway and Dover Mall, that would take traffic off Route 13 and
relieve some of the pressure points in this area. She indicated that this would be
looked at as part of the modeling that was in progress for the TID.
10. US Route 13 Sidewalk Construction - Construction of sidewalks along US 13
continues to be a priority. This project is not in the CTP. Construction of
sidewalks is required when properties develop.
Página 69
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING OF AUGUST 24, 2015 PAGE 14
Mrs. Townshend advised members that construction of sidewalks on Route 13 would
also be addressed through the TID. She indicated that at this point there were very
few sidewalk gaps on Route 13 and things seemed to be resolving themselves in this
regard through the development process. She noted that there were still a few key
pieces, stating that it would be great if DelDOT could come up with funds for this.
Mrs. Townshend advised members that, in addition to these projects, the City was
also in support of implementation of the Bicycle and Pedestrian Plans developed by
the MPO and approved by City Council in 2015. She expressed appreciation for the
construction of Capital City Trail segments by DelDOT and the active participation
on the part of DelDOT in the City’s efforts to make Dover more bicycle and
pedestrian friendly.
Mr. Sudler asked if financial assistance had been sought from 31st District Representative Sean Lynn
or 17th District Senator Brian Bushweller. Responding, Mrs. Townshend indicated that community
transportation fund dollars typically do not go toward projects in the CTP, since CTP projects are
larger than that pool of money could cover. She noted that staff had reached out to the legislators
in regard to advocating for Dover to get some of these projects into the CTP. Mrs. Townshend
explained that, on the technical side, staff participates in the MPO, attends the DelDOT CTP hearing,
communicates with DelDOT, and also makes sure that the City’s legislators know what the needs
are.
Mayor Christiansen advised members that he and Kent County Levy Court Vice President Brad Eaby
sit on the MPO and champion projects that would be beneficial to the City of Dover. He indicated
that Levy Court Commissioner At-Large Terry Pepper also seemed to support the City. Mayor
Christiansen stated his opinion that the City is well represented on the MPO.
Mr. Hutchison moved to recommend approval of the priority ranking for the coming year, as
recommended by staff. The motion was seconded by Mr. Keller and unanimously carried.
Mr. Hutchison moved for adjournment, seconded by Mr. Sudler and unanimously carried.
Meeting adjourned at 5:06 p.m.
James E. Hosfelt, Jr.
Chairman
JEH/TM/js/dd
S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\Committee-Minutes\2015\08-24-2015 SA&T.wpd
Página 70
LEGISLATIVE, FINANCE AND ADMINISTRATION COMMITTEE
The Legislative, Finance, and Administration Committee meeting was held on August 24, 2015, at
6:00 p.m. with Chairman Hare (departed at 6:39 p.m.; returned at 6:45 p.m.) presiding. Members present
were Mr. Cole, Mr. Sudler, Ms. Maucher, and Mr. Shevock. Members of Council present were
Mr. Anderson, Mr. Neil (arrived at 6:54 p.m.), Mr. Lewis (arrived at 6:45), Mr. Hosfelt, Mr. Hutchison,
and Mr. Slavin (departed at 6:38 p.m.; returned at 6:40 p.m.). Mayor Christiansen was also present.
AGENDA ADDITIONS/DELETIONS
Mr. Shevock moved for approval of the agenda, seconded by Mr. Cole and unanimously
carried.
Transfer of Real Property from Delaware Civic Center Corporation to Delaware State
University
Mr. Scott Koenig, City Manager, advised that a request was received from Delaware State University
(DSU) regarding the transfer of property from the Delaware Civic Center Corporation. He stated
that he had a few requests related to this item; however, he asked that the representatives from DSU
speak first. Mr. Koenig indicated that in January 2015, he, along with Mr. Kirby Hudson, Assistant
City Manager, former Council President David Bonar, and Mr. William Pepper, Deputy
City Solicitor, met by telephone with the representatives of DSU to talk about a potential transfer
of land and, since that time, the attorneys had been working on a way to potentially make that
happen.
Mr. Thomas Preston, DSU General Counsel, reviewed his letter to Council President Slavin, dated
August 11, 2015. He stated that approximately 13 years ago, the ownership of three (3) parcels of
land was transferred to the Delaware Civic Center Corporation (DCCC). Mr. Preston informed
members that approximately 41 acres of that plot was owned by the City of Dover, and the City
maintained a reversionary interest which stipulated that if the DCCC did not use the property for
building a civic center within 10 years, the City could demand that the land revert back to the City.
He indicated that K.W. Lands, LLC donated a parcel of approximately 6.3 acres which had a similar
reversionary interest. The last parcel was given in fee simple, with no reversionary interest.
Mr. Preston stated that the DCCC did not build the civic center and, in fact, went out of existence.
Mr. Preston explained that DSU was committed to building that facility if they can get the funding,
noting that they are currently working on it; however, in order to move forward, DSU needed to
solidify the real estate portion. Mr. Preston stated that DSU was asking the City to either waive its
reversionary interest entirely or agree that DSU has a certain period of time to try to raise the money
to build a convocation center. He noted that if it were built within that time, the reversionary interest
would expire.
Mr. Sudler asked what the DSU board of trustees’ most recent decision was in regard to this matter.
Responding, Mr. Preston stated that the board was in favor of this matter; however, he explained that
the board would be most interested when they come up with financing. He noted that the board
recognized that this is a facility that would be tremendously additive to DSU, as well as Kent County
and the City of Dover.
Página 71
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF AUGUST 24, 2015 PAGE 2
Mr. Sudler asked how soon construction would begin if the City were to waive the reversionary
interest. In response, Mr. Preston stated that this would be a $57.5M project and DSU was a long
way from having that amount. He explained that DSU was talking to people and there were some
incredibly creative ideas being floated around. Mr. Preston stated that they would like to believe that
it would come to fruition but he could not make a pledge.
Mr. Shevock questioned what type of building DSU planned to build on the property, whether it
would be an academic building or sports related. Responding, Mr. Preston explained that the
building would be a combination that would house a basketball arena, volleyball, and those kinds
of sports, and it would also have facilities around the exterior of the building that would be
academic. He stated that DSU was talking to people about creating a health center that would use
part of the facility as well, and it would be designed to be easily used for conventions, trade shows,
and the like. The purpose underlying the building was to be very flexible and provide a facility that
does not exist anywhere else in Delaware, specifically in Kent or Sussex counties.
Mr. Shevock asked if there would be a provision for some type of attachment to DSU’s other
properties. In response, Mr. Preston explained that approximately a month and a half ago, DSU had
discussions with the Delaware Department of Transportation (DelDOT) regarding their plans for the
extension of Crawford Carroll Avenue. He stated that, assuming that it comes to pass at some point,
Crawford Carroll Avenue would be a connection and DSU would also plan to have a walking path.
Mr. Preston noted that DSU currently runs small buses up to the residence hall, which used to be the
Sheraton, and down Route 13; however, the idea would be to get the traffic off of Route 13 if
possible.
Mr. Anderson expressed his opinion that this would definitely be a positive addition to the City. He
noted that the land was in a good and valuable location and the City should reclaim its interest. He
questioned the possibility of a partnership with DSU and the City regarding payment in lieu of taxes
(PILOT) and issues of that nature if the City were to transfer the property to DSU. Responding,
Mr. Preston stated that DSU would be happy to talk to the City about it; however, it was his hope
that it would not be linked to this particular transfer because it was his thought that these were
separate topics and ought to be discussed separately. Mr. Preston stated that DSU understood the
City’s concern about this and was prepared to talk at the City’s convenience.
Ms. Maucher asked what funding sources had been identified and if Mr. Preston expected to have
issues similar to those that the City had in raising funds. In response, Mr. Preston stated that they
were not in a place with any of the potential partners to say that they had identified any real sources.
He explained that they had looked at public/private partnerships all over the country that had built
medical buildings, hospitals, schools, etc., and they knew that this was possible. Mr. Preston stated
that they just have to find someone who is prepared to invest $60M in Kent County in a convocation
center, which was not the easiest deal to sell. He noted that they were making some progress, and
he was guardedly optimistic.
Referring to the other models that Mr. Preston had looked at, Ms. Maucher asked what the timing
was to obtain the funds. Responding, Mr. Preston stated that it varied. While some of the big
California universities have had a lot of money and a lot of support and were able to put together a
Página 72
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF AUGUST 24, 2015 PAGE 3
public/private partnership very quickly, others had taken a great deal of time. He stated that some
buildings would be easy to build because there is cash flow immediately. With a residence hall, for
example, 500 kids move in every year and may pay $9,000 a year for the room, which puts a lot of
bricks and mortar on the ground, but convocation centers are tougher.
Members were provided the Delaware State University Convocation Center Final Report, Delaware
State University, Dover, Delaware, May 2014 (Attachment #1). Mr. Preston stated that this
feasibility study estimated that the proposed convocation center would have between 144 and 170
events every year, only 40 percent of which would be DSU related. He explained that it was difficult
to estimate how many of those would be free events versus those for which tickets would be sold.
Mr. Preston stated that the estimate for building operations was between $5.5M and $7.2M, which
would be significant for this economy. He indicated that the convocation center would result in
approximately 180 permanent jobs, as well as approximately 500 jobs during the construction.
Mr. Preston noted that, fiscally, this would be a big deal for Kent County and Dover.
Mr. Sudler asked whether DSU had entertained the idea of giving the City of Dover a discounted rate
if the City needed to do something in that capacity. In response, Mr. Preston stated that this had
never come up; however, DSU facilities were currently used frequently by the City as well as State
and County organizations. He indicated that typically contracts include a charge of $150 or $200
and he did not see any reason why it would not be the same. Mr. Preston stated that the only caveat
would be that DSU would have to maintain the building and pay the light bill.
Mr. Hare noted that there was an electric transfer station on the property which the DCCC was going
to pay to have moved. He questioned whether it would need to be moved for the proposed
convocation center and, if so, whether the City or DSU would pay have it moved. Responding,
Mr. Preston stated that Mr. Hare was the first to raise this issue; however, he explained that if DSU
had a public/private partnership deal, he did not think this would be a major problem. He indicated
that it would need to be moved and this would be done as part of the cost of putting up the building.
Mr. Hare expressed his opinion that due diligence had not yet been done by the City to know what
would be given away, noting that someone may be interested in purchasing the land.
In response to Mr. Hare, Mr. Preston indicated that in 2001, the City was satisfied that the benefits
from having the civic center built, the jobs that it would create, and the commercial traffic that it
would generate would more than offset whatever the value of the land was, noting that he did not
have any reason to believe that the analysis had changed since 2001. He stated that DSU did not
have an appraisal of the property and he did not know its worth.
Mr. Preston stated his understanding that there were issues with the property that would need to be
taken care of, noting that a major portion of it is fill, which would impact the value. He expressed
his opinion that the City had to consider whether putting up a center that would result in 180
permanent jobs and between $5M and $7M per year, would be worth more to the City in the long
term than whatever this particular 41 acres could be sold for.
Página 73
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF AUGUST 24, 2015 PAGE 4
Mr. Hare asked for a breakdown of the 180 full-time positions that the center would have. Noting
that Mr. Preston indicated that the center would have 144 to 170 events per year and some may be
fee-paying events, Mr. Hare asked if there would be any revenue to the City from taxes or anything
like that. Responding, Mr. Preston stated that there would certainly be revenue to the City from
utilities, as there is from the campus now. Noting that DSU pays almost $3.6M per year, he stated
that the amount would increase with the construction of a substantial new building. Mr. Preston
stated that they would not go forward with this project if they were not satisfied that the spin-off, in
terms of revenues, jobs, etc., more than outweighed the cost of building it. He expressed his belief
that this property would not be taxed any more than the rest of the University’s property.
In response to Mr. Hare, Mr. Preston confirmed that the University’s property is not taxed at all. He
expressed hope that the City of Dover had concluded that having DSU as a neighbor was profitable
in ways other than tax revenue.
Mr. Koenig, referring to staff’s meeting with DSU in January, stated that the City was interested in
this concept from an administrative standpoint; however, he explained that a couple of things had
happened in the intervening time and the City was under pressure in a number of different areas.
Mr. Koenig stated that the City wants to encourage development because it is desired that the
economic base expand, both in Dover and Kent County, and this would be a good project on many
facets for that. He noted that DSU was on the record as saying this would create utility revenue for
the City. Mr. Koenig advised members that there were three (3) separate parcels which had been
assessed in total at approximately $2.8M by the City’s tax assessment office. He stated that all
three (3) parcels were currently tax-exempt because they were granted to the Civic Center
Corporation.
Mr. Koenig informed members that since the January meeting with DSU, two (2) things had
happened which were very specific to this discussion. He reminded members that State revenues
and transfers to local governments are a big question for the future. Mr. Koenig explained that it was
important for the City to take advantage of opportunities to discuss PILOT agreements or long-term
partnerships where the City receives revenue. He stated his understanding that DSU might not want
to couple these two (2) things together; however, he advised that this was really the time to talk
about it since DSU was now on record as saying that this facility would generate additional income.
Mr. Koenig indicated that unless these discussions begin now, in the early stages, it would be
difficult for the City to get DSU on the record in the future. He advised members that the PILOT
agreement was something that the City was interested in; however, it had not been discussed with
DSU prior to this evening. Mr. Koenig stated that DSU had approximately $250M of assessed land
value in the City of Dover, which represents a huge economic investment in Dover. Mr. Koenig
noted that having the University inside the City limits provides many advantages to the City;
however, he reiterated that there was the issue of PILOT, which the City had not discussed with
them.
Mr. Koenig stated that the second issue, which had come up in the last 10 days, was related to
potential solar fields on this property. He advised members that, under the renewable portfolio
standards, the City would be deficient in Solar Renewable Energy Credits (SRECs) in the next
Página 74
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF AUGUST 24, 2015 PAGE 5
couple of years. He explained that in January, staff had not discussed what the City would do in the
future for the next round of these renewable energy sources. Referring to the Conceptual Site Plan
on Page 16 of the Delaware State University Convocation Center Final Report, Delaware State
University, Dover, Delaware, May 2014, Mr. Koenig noted that the area labeled future parking
would be attractive to a solar developer for the location of a solar field. He stated that the City
would like to entertain that discussion with potential solar developers for this part of the land,
because this was the cap on the old landfill.
Mr. Koenig stated that the 40+ acres of land that the City owned was an inert landfill that went
through a closure exercise back in the mid-1990s. He explained that for the last four (4) or five (5)
years, the City of Dover had been paying a small amount for the inspection of that cap to make sure
that it stays in place and that the closure documents stayed current, or green, while the Civic Center
Corporation had been defunct.
Mr. Koenig reiterated that the City has a need for future solar development and advised that
Mr. Harry Maloney, Electric Director, had indicated that this was a really good area based on current
technology whereby a solar developer can build a floating field of solar power that would not be
damaged by the differential sediment of the landfill cap. Mr. Koenig stated that staff would like to
bring this matter before City Council as a discussion that the land labeled as future parking may
potentially be something that the City would like to pursue for solar fields. Although staff did not
currently know how much land would be needed for the solar fields, the rough estimate was in the
five (5) acre range, which would still leave a substantial amount of land that the City would not have
a future interest in.
Mr. Koenig advised that, from an administrative level, he would like to take the best of all the
discussions going forward. He explained that he would like to continue discussing the potential
transfer of the land, and evaluate whether a portion of this land that is away from the convocation
center could be redeveloped or developed as a solar field through the City’s integrated resource plan
that is about to go out for proposals. Mr. Koenig stated that he would recommend that the City do
the reversion clause, in case DSU does not move forward with the project, so that the City would
have the potential to further evaluate this for either expansion of renewables or some other
development application that may happen in the future.
Mr. Shevock noted that the Conceptual Site Plan indicated that the City would require 1,600 parking
spaces for a 4,800-seat facility and that the proposal was approximately 500 spaces short. It was his
assumption that parking would go over into the future parking area and he questioned how much of
the future parking would be used for a solar panel field.
In response to Mr. Shevock, Mr. Koenig, noting that the Conceptual Site Plan depicted the electric
substation in its current location, stated that DSU did not contemplate moving the electric substation,
which would be substantially costly. Mr. Koenig was unsure of the exact amount of land that would
be needed for a solar panel field or how it would impact DSU’s plan. He stated that the number of
parking spaces needed would depend on the event being held and could be worked out as the City
moves through design.
Página 75
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF AUGUST 24, 2015 PAGE 6
Mr. Shevock asked if a waiver request regarding the specified number of parking spaces would come
back to the City. Responding, Mr. Koenig stated that there could potentially be a waiver, but that
would have to be granted by the City’s Planning Commission through the planning process.
Mr. Hutchison asked if DSU had a timetable related to construction for this project. In response,
Mr. Koenig noted that Mr. Preston said the sooner the better but that they did not have funding
arranged at this time.
In response to Mr. Hutchison, Mr. Preston stated that DSU would love to begin construction
tomorrow; however, they have to have the money and would not start building without having
identified the sources.
Mr. Hutchison stated that he loved what he saw, noting that it was very impressive and long overdue
for DSU. He expressed his hope that the City Manager, Economic Development Office staff, and
DSU would work together to develop an agreement. Mr. Hutchison noted that there are many
opportunities with the campus growing the way it is.
Responding to Mr. Hosfelt, Mr. Koenig reiterated that the City’s parcel was approximately
41.5 acres and estimated that the assessed value of this property was approximately $2.4M. He
reminded members that it should be taken into consideration that this was a landfill and not highway
frontage.
Mr. Hosfelt was not sure whether giving away $2.4M of land was the best idea with the current state
of the City. He expressed his opinion that this somehow needed to be tied to PILOT. Mr. Hosfelt
noted that members had discussed how much the land was worth, the area that it takes up within the
City, and the fact that this project would have an impact on City services, such as the police
department, fire department, ambulance service, etc. He stated that it was going to have more of an
impact than just paying those fees. Mr. Hosfelt thought that, going forward and especially if this
would be a money-making venture for the University, it would not make sense for the City to give
away $2.4M worth of land.
Mr. Hare stated that he spoke to someone from DSU earlier in the day who said that after Labor Day
the City was welcome to come out and have a conversation with Dr. Williams. Mr. Hare reiterated
that he did not believe that the City should make a decision without more information.
Ms. Maucher asked if DSU felt that they could not move forward without title to the land or if there
could be some type of agreement that once certain goals are met by DSU, the land could be
transferred. She was concerned that DSU could have the same fundraising issues as the DCCC and
the property could sit for another 13 years without being utilized.
In response to Ms. Maucher, Mr. Preston stated that, under the best circumstances, raising the
amount of money required to construct the proposed building would be a challenge, and he did not
have any problem with the City maintaining the reversionary interest. He explained that it would
Página 76
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF AUGUST 24, 2015 PAGE 7
be difficult to move forward when he could not tell a potential partner that DSU had the land and
show them what it looked like. Mr. Preston stated that DSU had to start the process with the
foundation, which was the land.
Ms. Maucher asked how long a reversionary period DSU would want, whether it would be another
10 years or if five (5) years would be sufficient, with an option to extend. Responding, Mr. Preston
stated that the City of Dover was DSU’s partner and DSU would work with the City. He explained
that if five (5) years with an option for another five (5) was the way the City wanted to go, DSU
would be happy to discuss it. Mr. Preston stated that the problem was that there was no money in
the State coffers and he did not think the State would be in a position to build a $57M building any
time in the reasonable future. He indicated that DSU had to be completely different and creative,
and that process was taking some time, noting that DSU had been talking to people for at least a
year; however, he did not have anything he could put on the table. Mr. Preston stated that DSU had
a terrific person helping them and they were confident that they would get it done, but it could easily
be another five (5) years.
Mr. Sudler asked what the largest amount was that DSU had raised, and in what amount of time they
had raised it. In response, Mr. Preston stated that DSU was in the midst of its most successful capital
drive in the 125-year history of the University. He indicated that DSU targeted $20M, and he
believed they were at $16.5M in two-and-one-half years. Mr. Preston explained that this capital
drive was targeted for scholarships.
Mr. Anderson expressed his support for this concept and stated that the City needed to reclaim its
interest in the property and discuss this matter to determine where the City was going. He was not
sure of the feasibility of a solar park and whether this would be an ideal place for it with the building
around it and all of the trees. Mr. Anderson thought that the City Manager needed more time to
evaluate the options and suggested that perhaps this item could be discussed in three (3) to six (6)
weeks.
Council President Slavin thanked Mr. Preston and his team from DSU for briefing members on this
project. He also thanked members for expressing their concerns, which he thought were well
founded and well communicated. Mr. Slavin stated that this was the period of due diligence that was
needed, noting that there would be many ways of meeting all of these interests, noting that he had
not heard any opposition to the idea of bringing in additional jobs or to the status and prestige that
a convocation center would have for the region and DSU.
Mr. Hare reiterated his concerns regarding the current state of the City and the possibility of giving
$2.4M worth of the land to DSU to build a $60M convocation center. He informed members that
DSU currently had $259M worth of tax-free property in the City and the State of Delaware had
$280M worth of such property in the City. This proposal would increase DSU’s amount to more
than $300M and result in DSU having more tax-free property in the City than the State of Delaware
has. Mr. Hare expressed his opinion that more due diligence needed to be done to justify to the
citizens why the City would give 41+ acres of land to DSU, while the citizens would pay more taxes
because DSU does not pay any.
Página 77
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF AUGUST 24, 2015 PAGE 8
Mr. Sudler moved to continue conversation and information gathering from Delaware State
University (DSU), as well as the City Manager, and for DSU to come back and give another
presentation in regard to how they could economically benefit both the City and DSU. The motion
was seconded by Mr. Cole.
Responding to Mr. Hare, Mr. Sudler and Mr. Cole agreed to stipulate that this item be considered
at the first meeting in October.
The motion to continue conversation and information gathering from Delaware State
University (DSU), as well as the City Manager, and for DSU to come back at the first meeting
in October and give another presentation in regard to how they could economically benefit
both the City and DSU was unanimously carried.
Referring to the Delaware State University (DSU) convocation center, Mr. Bill Neaton, Economic
Development Manager, noted that the City’s Economic Development Office had been working with
DSU since the first day that their plan came out. He noted that the Economic Development Office,
the State legislators, and the Chamber of Commerce were all part of the feasibility study that was
funded by the State for the convocation center. Mr. Neaton informed members that a number of
locations were considered prior to coming up with the proposed location and, due to the proximity
to the University, the size of the parcel of land, and the parking area, this one (1) far exceeded every
other parcel of land that was examined.
Semi-Annual Review - Statistics Regarding Jobs and Businesses Gained and Lost in the City
of Dover Since January 2015 (Deferred by Committee on August 10, 2015 Due to Time
Constraints)
Mr. Bill Neaton, Economic Development Manager, reviewed statistics regarding the City of Dover
top employers, noting that DSU was one (1) of the larger employers in the City of Dover, with
approximately 1,000 full-time and part-time employees. He noted that they continued to expand
their programs, and the Optical Science Center for Applied Research (OSCAR) was about to open.
Mr. Neaton stated that DSU continued to expand and create a base in the City of Dover that is a
Center of Excellence, and the City was pleased to partner with the University.
Mr. Neaton informed members that Bayhealth continued to expand and had added approximately
100 employees since January 29, 2015, which would continue to increase. Bayhealth had purchased
property south of Milford, where they would be building a health campus at a projected cost of
between $250M and $275M. Mr. Neaton stated that Bayhealth was continuing to purchase physician
practices which would also increase their employee base.
Mr. Neaton stated that Dover Air Force Base continued to remain stable. He explained that the City
of Dover was currently involved in a community partnership initiative with Dover Air Force Base,
to assist the Base in reducing their costs so they could remain a viable partner in the City of Dover.
Mr. Neaton stated that the City of Dover, residents, and Dover Air Force Base have a really unique
relationship, noting that those at the Base who have lived in other places say that it is probably the
Página 78
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF AUGUST 24, 2015 PAGE 9
best relationship of any community and military base in the country. He reminded members that
several awards had been won for having that kind of relationship. Staff continued to meet with
Dover Air Force Base, and the next partnership initiative meeting would be held later in the week.
Mr. Neaton explained that Edgewell, formerly known as Playtex and then Energizer, was now a
separate corporation from Energizer, with their own letters on the stock exchange. Edgewell is the
leading edge concentrating on well-being. Mr. Neaton informed members that Edgewell was
continuing to retrofit their plant in Dover, and their engineer advised Mr. Neaton that they were on
schedule to complete the project in 2017 and transfer all of their feminine care manufacturing from
Canada to Dover, which would provide several hundred jobs in Dover.
Mr. Neaton reminded members of the Kraft Foods and Heinz merger, which resulted in the loss of
2,500 jobs in the company. He stated that the day that this was announced, he and the Mayor made
contact with the plant manager at Kraft Foods, who was cautiously optimistic that they would not
see a major impact in these job cuts. Mr. Neaton stated that Kraft was lean and mean at the levels
of management, and was manufacturing products that nobody else in the country manufactures. He
advised that he, the Mayor, and the City Manager would be meeting with the plant manager on
Friday morning to discuss what is necessary for the City to assist Kraft in moving forward.
Mr. Neaton indicated that they are truly a great partner to have in the City of Dover, and staff
maintained almost monthly contact with them. He advised that when he called Kraft regarding the
City’s need for water for this year’s Comicon at the Dover Public Library, they donated 5,000 bottles
of water.
Mr. Neaton noted that Procter & Gamble, another great partner for the City, had remained steady and
was preparing to celebrate their 40th anniversary.
Mr. Neaton advised members that Wesley College had a new president, Mr. Clark, who is a very
progressive thinker. Mr. Neaton expressed his opinion that Mr. Clark would do great things for
Wesley College.
Mr. Neaton stated that Hirsh Industries was a silent little business located on the northern edge of
Dover that takes rolled steel and manufactures filing cabinets and, last year Hirsh manufactured
approximately one (1) million filing cabinets. Mr. Neaton informed members that he and the Mayor
met with Hirsh last month to discuss some concerns and problems they were experiencing. Hirsh
asked for assistance from a few City departments, and the City responded almost immediately to
their requests. Mr. Neaton advised members that the City was continuing to assist Hirsh with their
warehousing. They had discussed expanding and met with the City Planner last week. Mr. Neaton
stated that Hirsh discussed abandoning a lift station and going into gravity feed into the sewer
system; however, it was his understanding that they were not going to do this because it would be
too costly. He noted that the Public Works Department, Planning Office, and Mayor’s Office had
been working very closely to assist Hirsh.
Página 79
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF AUGUST 24, 2015 PAGE 10
Mr. Hutchison noted that Kraft Foods had expressed concerns regarding the high cost of electricity
and asked if that would be part of Mr. Neaton’s discussions. Responding, Mr. Neaton informed
members that a meeting was scheduled for Friday, August 28, 2015 to discuss various issues, which
he thought would include the cost of utilities.
Mr. Anderson asked what the current unemployment rate was for the City. In response, Mr. Neaton
stated that he did not know the current unemployment rate for the City but he would forward it to
Mr. Anderson. Mr. Neaton noted that it had remained fairly stable over the last few months but was
a little higher than the State level.
Mr. Anderson asked if Mr. Neaton had heard any concerns from Dover’s major employers other than
those in regard to commercial utility rates. Responding, Mr. Neaton indicated that commercial utility
rates were probably the greatest concern. He stated that they are pleased with staff’s response time
to their requests. For example, Mr. Neaton advised that Kraft Foods experienced power problems
in their yard last year and the plant manager and the City worked very quickly to resolve their
problems.
Mr. Anderson stated that he had also heard concerns regarding commercial utility rates, particularly
with the small three (3) percent increase included in the FY 2016 Budget.
Referring to Edgewell, Mr. Anderson noted that there was a plan to significantly increase the jobs
at the Energizer/Playtex plant, by at least 50 percent, over the next several years and asked if there
were any changes to that plan, with the spin-off of Edgewell. In response, Mr. Neaton advised
members that Edgewell was still on board with that plan. They are in the process of shutting down
their plant in Canada and those jobs will come to Dover, which will result in the 50 percent increase.
Mr. Neaton stated that there was some plastic container manufacturing at the Dover plant which had
between 40 and 45 jobs, and the City attempted to keep those jobs in Dover; however, that
manufacturing was unfortunately transferred to Connecticut. He explained that they already had a
clean room setup in Connecticut and it would have cost them approximately $2M more to build a
clean room in Dover.
Referring to the new shopping facility near Sam’s Club, Mr. Anderson asked if there was a time
frame for the five (5) stores, and how the facility would impact employment and the value of the
City’s investment in that area. Responding, Mr. Neaton advised that he had weekly contact with
Mr. Dean Pletz, Vice President of The Onyx Group, which is doing that project. He noted that they
expect to have the first store completed sometime in January or February 2016. Mr. Neaton
indicated his understanding that the first store would be Petco. The Onyx Group expected the rest
of their project to be complete early next year. As far as employment, Mr. Neaton stated that he
could not guess at the numbers; however, with five (5) retail stores and a restaurant, he indicated that
it could possibly be in the hundreds of employees.
Mr. Neaton advised members that the projected completion date for the Produce Junction Store
was the end of September or the first of October 2015. He believed that they would employ
approximately 60 to 70 people. In response to Mr. Hare, Mr. Neaton stated that the Produce Junction
Store would be located at the former Office Max site.
Página 80
LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING OF AUGUST 24, 2015 PAGE 11
Responding to Mr. Anderson, Mr. Neaton stated that the City’s incentives had absolutely impacted
these developments and had a very positive effect in bringing people into Dover.
Mayor Christiansen reiterated that City staff would be meeting with 20 of Dover’s largest utility
users on Friday, August 28, 2015. He stated that the meeting was facilitated at the request of the
Chamber of Commerce and employers were invited to attend. Mayor Christiansen noted that the
Chamber was working in tandem with the City’s Economic Development Office and the City
Manager’s Office to guarantee that these employers would let the City know the issues that they are
having, the hardships that they face, and how the City needs to protect the jobs currently in place,
as well as bring new jobs to the City.
Responding to Mr. Hare, Mr. Neaton informed members that the former K-Mart is owned by people
in Cleveland, Ohio and they have a tenant. He stated that he had spoken to them approximately
one (1) month ago and they had submitted a plan to the Delaware Department of Transportation
(DelDOT) regarding additional entrances and exits. Once that is approved, they would be able to
announce who the potential tenant is. Mr. Neaton explained that he had seen the plans for the
facility, which include additional landscaping and islands in the parking lot. He stated that the plans
also included landscaping along Route 13, as part of the beautification of Route 13.
In response to Mr. Sudler, Mr. Neaton explained that the five (5) new retail stores would be located
on the site of the former Walmart and would include Ross Dress for Less, Petco, and Five Below.
He stated that there would also be an Outback Steakhouse built on a pad site at that location.
By unanimous consent, the meeting adjourned at 6:55 p.m.
William F. Hare
Chairman
WFH/TM/dd
Attachments
Attachment #1 - Delaware State University Convocation Center Final Report, Delaware State University, Dover,
Delaware, May 2014
Página 81
ATTACHMENT #1
Legislative, Finance, and Administration Committee Meeting of 08/24/2015
Delaware State University
Convoca on Center
Final Report
Delaware State University
Dover, Delaware
May 2014
ATTACHMENT #1
Legislative, Finance, and Administration Committee Meeting of 08/24/2015
Página 82
Participants
Representatives from Delaware State University (DSU), the State of Delaware, Kent County, the City of Dover and the Greater Kent Committee, came together to
participate in a series of workshops and conference calls to brainstorm and provide feedback on the Delaware Convocation Center project. We thank all participants for
their assistance with furthering the project.
Steering Commi ee Project Team:
Senator Colin Bonini, State Senator, 16th District
Senator Brian Bushweller, State Senator, 17th District Holzman Moss Bo no Architecture
Rep. Darryl Sco , State Representa ve, 31st District Douglas Moss, AIA, LEED BD+C
Mayor Carleton Carey, Mayor, City of Dover Pa y Chen, AIA, LEED AP
Mr. Bill Neaton, Economic Development Manager, City
of Dover
Mr. James Waddington, Director – Economic ForeSite Facility Planners
Partnership, Kent County Levy Court Peggy Chong, Assoc. AIA, LEED Green Assoc.
Ms. Judy Diogo, President, Central Delaware Chamber
of Commerce Conven ons, Sports & Leisure
Ms. Shelly Cecche , Execu ve Director, Greater Kent Interna onal
Commi ee Jay Lenhardt
Mr. Bill Strickland, Past President, Greater Kent Weston Johnson
Commi ee
Mr. Stuart Ou en, Former Chair, Delaware Civic Center
Corpora on Becker Morgan Group
Ms. Carolyn Curry*, Chief of Staff and VP for Gregory Moore, P.E.
Ins tu onal Advancement, DSU Michael Henry, LEED AP
Dr. Amir Mohammadi*, University Treasurer,
DSU EDIS
Dr. Alton Thompson, Provost & VP for Academic Gerald Doherty, LEED AP
Affairs, DSU Rob Belfiore, LEED AP
Dr. Teresa Hardee, VP for Finance, DSU
Mr. Victor Santos, Government Rela ons, DSU
*Commi ee Co-Chair
Página 83
CONTENTS
Introduc on 1
Overview
Process
Mission, Mandates and Major Assump ons
Understanding the Market 5
Methodology
Market Characteris cs
Recommenda ons 9
Public-Private Partnership
Phasing
Building Program
Site Op ons
Cost
Projected Impact 21
Events and A endance
Financial Opera ons
Economic Impacts
Funding Analysis
Management Op ons
Delaware Convocation Center
Página 84
Project Objectives
Through visioning sessions with the Steering CommiƩee,
the following list of prioriƟes for the project was established:
• Create an academic building that supports DSU’s pedagogical
mission
• Envision DSU facility for shared use by the entire state of Delaware
• Establish indoor venue for DSU convocation and graduation
• Develop premier facility for men’s and women’s NCAA basketball
• Create multi-use facility for large assemblies, conferences, trade
shows, entertainment and athletic events
• Assess market to estimate users, uses and financial viability
• Establish strategies to achieve annual financial break-even
• Create engine to enhance economic development (job creation
and tourism)
• Promote active partnerships with DSU, State of Delaware, Kent
County, City of Dover, and school districts
• Provide a premier facility through design excellence
Página 85
Introduc on
Project Overview Existing Conditions and Needs
The desire to embark on a feasibility study for the It is vital for DSU to have a convocation center.
Delaware Convocation Center arises from the myriad The lack of an appropriate large-scale indoor
needs of Delaware State University, the City of location for commencement activities has resulted
Dover, Kent County and the state of Delaware for an in the implementation of last-minute alternative
assembly and event space. The convocation center, arrangements due to inclement weather. In 2009,
a place to hold graduation ceremonies on a twice attendees sat in the rain throughout the graduation
yearly basis, is a much-needed gathering space for ceremony with many having to leave due to the
the university and the residents of the surrounding downpour. In 2010 and 2011, the graduating class
region. was split into three smaller groups and separate
ceremonies were carried out indoors. Neither option
Capitalizing upon the potential synergies of a is an ideal way to celebrate the graduates and their
joint project between town and gown, the study families on the day that caps the students’ college
investigates the viability of a convocation center and career, a day which should be the source of many
its impact upon the region. Reviewing current market proud, happy memories.
conditions and trends, existing facilities, surveys
and interviews with prospective stakeholders and
users, the study presents a holistic and conservative
assessment of the project’s feasibility.
In conjunction with the data and information
compiled, the study also takes a preliminary look
into the size and usage of a facility that would be
suitable for the Dover area market. The hypothetical
facility allows the team to get further feedback about
its appropriateness to the community, usability,
cost and economic impact on the region, in addition
to exploring ways of accommodating both the
university’s and community’s programming and space
needs.
2
Delaware Convocation Center
Página 86
In 2009, rain impeded the commencement ceremony, dampening the spirits of the graduates and their families. The lack of an indoor venue that could accommodate all the
par cipants was sorely felt.
3
Página 87
Process
Bringing together a mul -disciplinary team, Holzman
Moss Bo no Architecture was commissioned to
undertake this study in April 2013. The scope of
work included assessment of the market condi ons,
inves ga ng poten al sites, establishing a
preliminary program and construc on cost, analysis
of financial and economic opera ons, examina on
of funding op ons and assessment of ownership and
management op ons.
To address the range of issues, the team includes
experts from fields such as market and financial
planning (CSL Interna onal), space planning (ForeSite
Facility Planners), civil/ traffic/ site analysis (Becker
Morgan Group) and cost es ma ng/ scheduling (EDIS-
Barton Malow joint venture).
Over a period of nine months, the team undertook
numerous surveys and interviews with members
of the community, key poten al stakeholders and
users, in addi on to market research. The team made
periodic presenta ons to the Steering Commi ee to
keep them apprised of our findings, while providing
various op ons for the proposed facility in order
to fine-tune our recommenda ons. Members
of the commi ee included state senators, state
representa ves, representa ves from the City of
Dover, representa ves from Delaware State University,
members of the Greater Kent Commi ee, Central
Delaware Chamber of Commerce and many others.
4
Delaware Convocation Center
Página 88
LOCALMARKET
INDUSTRYTRENDS CONDITIONS COMPARABLE/
COMPETITIVEVENUES
PROJECTPLANNING/
LOCALMEETINGS POTENTIALUSER
Delaware INTERVIEWS/SURVEYS
MARKETDEMAND Convoca on BUILDINGPROGRAM
Center
SITESELECTION Feasibility Study REVENUEANDEXPENSE
PROJECTION
FUNDINGALTERNATIVES
OWNERSHIP/
ECONOMICIMPACT MANAGEMENTOPTIONS
ANALYSIS
CONCEPTUALDESIGN
PROJECTCOSTS FORSITE
To achieve an in-depth understanding of the mul ple factors affec ng the viability of the proposed convoca on center, the team embarked on a scope of work, as represented
in the diagram above, to look at the project in a holis c and comprehensive manner. The methodology allowed the team and the Steering Commi ee to analyze the social,
financial and economic impacts related to the project throughout its life.
Página 89
Understanding the Market
Methodology • Level of support for and overall a tude toward
the convoca on center project;
In planning the development of the proposed • Level of support for various poten al project
Delaware Convoca on Center, it is important to funding sources;
solicit feedback from poten al facility patrons and • Local mee ng and event/mee ng space needs;
stakeholders. Interviews were conducted with more • Interest in using event/mee ng space at the
than160 organiza ons and stakeholders including proposed Delaware Convoca on Center; and,
Delaware State University; City, County and State • Interest in priority/premium sea ng op ons and
officials; local/regional business community; spectator poten al naming and sponsorship opportuni es
event promoters; state/regional conven on planners; that could be offered at the proposed Delaware
other higher educa on campuses; regional K-12 Convoca on Center.
schools; and regional hospitality industry leaders.
The interviews and surveys iden fied a variety of
“This area needs a large A comprehensive survey was also distributed via email needs not met by exis ng event venues, ascertained
to the Dover/Kent County-area business community moderate demand for concerts, family and spor ng
arena to aƩract big name, as well as university students, faculty/staff, alumni events, determined a strong level of interest from
state organiza ons, and brought to light robust
revenue-generaƟng events and donors and other area residents. More than 300
support for a public-private partnership. Of vital
surveys were completed, providing important insight
and entertainment. Currently into the following: importance, more than 90% of the survey respondents
exhibited a posi ve a tude towards the project.
residents have to travel 1½ • History of a endance at other event and
hours in any direcƟon to assembly facili es in Dover and the surrounding Market Characteris cs
region;
get access to cultural and • Interest level in a ending various types of Market a ributes such as local and regional market
entertainment events of events/programming at the proposed Delaware demographic characteris cs, transporta on access
Convoca on Center; and compe ve entertainment establishments in
significant caliber. This is long • Current rela onship with Delaware State the local and regional market provide key indicators
University and the local/regional community;
overdue.“ - comment by survey • Opinions on the convoca on center’s poten al
of the poten al demand for the proposed Delaware
Convoca on Center.
respondent impact on the community and its residents;
6
Delaware Convocation Center
Página 90
The following is a summary of the key findings of the
analysis of market characteris cs.
• The Dover metropolitan area is home to
approximately 168,000 residents. (Fig. 1) The
proposed Delaware Convoca on Center will
have the poten al to draw a endees from
throughout the Delmarva region, which has a
popula on of approximately 1.4 million, and on
a more limited basis from the western shore of
Maryland, southern New Jersey and southeastern
Pennsylvania.
• Dover’s lack of commercial air service or
proximity to the I-95 corridor may impact the
proposed Delaware Convoca on Center’s ability
to a ract regional conven ons and certain
touring entertainment events. However, the
Dover market’s strong highway linkages to points
throughout the Delmarva Peninsula, along with its
rela vely central loca on within that region, make
Dover well posi oned to capture event delegates
and a endees from throughout the immediate
region. (Fig. 2)
• The availability of abundant, moderately priced
hotel rooms in Dover could be a significant
advantage in drawing conferences, sports
Fig. 1 This table provides some sta s cs about the
tournaments and other such events to the
popula on in the Delmarva region with regard to size,
proposed Delaware Convoca on Center. The
age and income.
ability to a ract these events could help increase
demand for hotels, providing a needed boost to
the local hotel industry.
Fig. 2 This table shows the distance and length of me
it would take to drive to Dover from surrounding ci es.
7
Página 91
• The City of Dover is not home to an indoor
entertainment venue with a sea ng capacity
greater than 2,500 seats and offers limited
exhibi on space, providing the proposed
Delaware Convoca on Center with poten al
untapped event opportuni es. However, the
facility could face compe on from regional
facili es such as the Chase Center in Wilmington,
the Bob Carpenter Center at the University of
Delaware in Newark for certain regional events.
Fig. 3. This chart summarizes the levels of interest from survey respondents for various events that could occur in
the proposed convoca on center
8
Delaware Convocation Center
Página 92
Conceptual Rendering of Gradua on Ceremony
The architect’s conceptual rendering for the convoca on center (a specific design has not been created) shows the arena accommoda ng a gradua on ceremony with 1,200
graduates on the event floor and an audience of 3,600 people in the sea ng bowl. The arena’s sea ng configura on is flexible, allowing it to be used for a variety of events such
as concerts, trade shows, spor ng events, and many others.
Página 93
Recommenda ons
Public-Private Partnership Building Program
The key components of the program consist of the
Many facili es around the country that are similar to academic spaces of the Health and Wellness Ins tute,
the Delaware Convoca on Center are based on public- the event floor of the arena, fixed and flexible bowl
private partnerships. Not surprisingly, survey results sea ng, visitor support spaces, support spaces for the
show that approximately 88% of the respondents athle c teams, administra on spaces and building
support a public-private partnership for the Delaware support spaces.
Convoca on Center. This strategy ensures that the
convoca on center can become an asset to the The arena’s event floor accommodates a variety of
university, central and southern Delaware, and the fields-of-play and retractable seats allow for greater
city, providing much-needed event space for various flexibility. In convoca on or commencement se ngs,
cons tuents, maximizing the building’s u liza on rate an addi onal 1,200 loose seats can be placed on the
event floor.
and enhancing the rela onship between the academic
and civic communi es.
Academic Program
As a DSU facility with an interest in varied community
and regional uses, the building program reflects The Academic Health and Wellness Ins tute is a fast-
growing academic program at DSU, which is sorely
the needs of diverse cons tuents in its lis ng of
in need of addi onal space. Classroom spaces can
spaces. An cipated ac vi es include a mix of
double as mee ng and ballroom spaces, and can cater
“This project would be great academic, spectator, athle c conven on, conference to the conven on and conferencing events that the
and mee ng events. The program provides the
for Delaware State University. opportunity for mul ple uses of the same space.
facility hopes to a ract.
We will have revenues for Phasing
the University and the city of Considera on has been given to zoning the building
to ensure ease of access by both the public and “Right-sizing” the facility is critical to ensuring its
Dover.” - comment by survey university students, faculty and staff. Much thought success. Currently, there are no facilities in Dover that
respondent has also been given to the successful sharing of seat more than 2,500 patrons for events. Based on
mul purpose spaces between the various en es. industry trends, analysis of market characteristics and
Conscien ous scheduling of spaces will be cri cal to responses from stakeholder interviews, a facility with
maintaining the smooth opera ons of the building. a capacity ranging from 4,300 to 6,000 would be ideal
to meet the concert, family show, sport event and
convocation needs of the city and university.
10
Delaware Convocation Center
Página 94
Keeping in mind the twin considerations of what
the market can support and budget constraints,
which influence the size of the proposed project,
the proposal puts forth the idea of a phased project.
The first phase would allow for the development of
a 3,600 seat facility (4,800 seats at graduation) with
the possibility of expansion to meet increased market
demand, if funding permits it. All the academic,
meeting and breakout spaces will be built in Phase 1
to allow the Health and Wellness Institute to be fully
functional from the first day. It is also vital to note
that some of these spaces provide opportunities for
rental income.
Phase 2 represents an increase in the number of
seats in the bowl, resulting in a total of 4,800 seats
(6,000 seats at graduation), a proportional increase in
visitor support spaces, and some building support and
storage spaces. The enlarged seating bowl presents
the ability to attract larger roadshows, better
publicized concerts and more tradeshows.
Retractable Seating
20,000 s.f. 20,000 s.f.
Planning for a porƟon of the seaƟng bowl to be
retractable allows for greater flexibility. When all the Fig. 4. The facility will meet all the needs expressed by DSU and the City of Dover from Day 1, providing all the
seats are pulled out, the event floor is at its smallest, required gathering, mee ng and academic spaces. Planning for a second phase, provides the opportunity for the
accommodaƟng acƟviƟes that fit within a basketball facility to respond to increased demand for sea ng in the arena.
court. When rows of seats are retracted, the event
floor expands, permiƫng acƟviƟes that require more
space, such as trade shows, concerts, the circus etc,
to occur, an invaluable feature given the lack of indoor
exhibiƟon space in Dover.
11
Página 95
Phase 1 Phase 1 and 2
PH 2 PH 1
CONCESSIONS RESTROOMS RESTROOMS CONCESSIONS RESTROOMS
CONCESSIONS CONCESSIONS
SEATING CONCESSIONS SEATING
SEATING SEATING SEATING
EVENT FLOOR CONCESSIONS EVENT FLOOR CONCESSIONS
CONCESSIONS
CONCOURSE CONCOURSE
SEATING CONCESSIONS SEATING
CONCESSIONS CONCESSIONS
CONCESSIONS RESTROOMS ACCESS TO RESTROOMS CONCESSIONS RESTROOMS ACCESS TO
ACADEMIC/ ACADEMIC/
MAIN LOBBY MAIN LOBBY
Conceptual Floor Plan LEVEL
Conceptual Floor Plan LEVEL
CONCOURSE
CONCESSIONS CONCESSIONS
CONCOURSE CONCOURSE
PH 2 PH 1
ACADEMIC/ LOBBY ACADEMIC/ LOBBY
STO. MEETINGS OFF. OFFICE STORAGE STO. MEETINGS OFF.
Conceptual Building Sec on Conceptual Building Sec on
Academic Public Sea ng Event Floor
In Phase 1, the sea ng will form a horse-shoe shape surrounding the event floor, accommoda ng approximately 3,600 people in the bowl sea ng. Phase 2 allows for an increase
of about 1,200 seats. With a total of 4,800 seats, the Delaware Convoca on Center will become an ever more a rac ve event arena for concert organizers and roadshows.
12
Delaware Convocation Center
Página 96
COMMENCEMENT CLASSROOM/ EXERCISE
(addi onal 1,200 seats)
>dhZ PHYSIOLOGY LAB
Retractable seats
BASKETBALL BADMINTON BOXING
VOLLEYBALL INDOOR SOCCER WRESTLING
HANDBALL TENNIS TAEKWONDO
Maximum Sea ng Configura on
This is a plan diagram of the sea ng bowl and event floor. Events such as convoca ons and basketball games will be accommodated in the maximum sea ng configura on. The
diagrams show addi onal ac vi es that could occur on the event floor.
Full Sea ng Bowl: 3,680 seats
13 Event Floor: 10,300 s.f.
Página 97
JOB FAIR Dh^/&^d/s> EYhd
(630 seats)
Retracted seats
CAR SHOW CONCERT TRADE SHOW
BMX /Zh^
Retracted Bowl Configura on
This plan diagram provides maximum event floor space by retrac ng rows of sea ng. In the retracted bowl scenario, the event floor will be able to accommodate larger-scale
events such as consumer shows, concerts, and many others.
Retracted Sea ng Bowl: 2,730 seats
Event Floor: 15,050 s.f. 14
Delaware Convocation Center
Página 98
Site Options
The team started by inves ga ng 12 poten al sites in
and around the DSU campus, before focusing on three
preferred sites. In exploring site op ons for the facility,
we took into account issues such as:
• Visibility from vehicular traffic on Route 13
• Proximity to DSU campus
• Pedestrian and bike access to DSU campus
• Traffic accessibility from Route 1 and Route 13
• Adequate space for new facility, parking, etc.
• Poten al for shared parking with neighbors
• Land ownership
• Environmental condi ons
• U lity infrastructure
• Reloca on of exis ng site infrastructure
In evalua ng the sites against the criteria listed above,
the site highlighted in blue emerged as the favored
op on (refer to adjacent diagram). As the former
Delaware Civic Center Site, it is currently owned by
the Delaware Civic Center Associa on. A transfer of
ownership would need to be discussed. Some of the
advantages of the recommended site include:
• Adjacency to DSU campus
• Ease of access
• Adequate parking
• Reduced cost of land acquisi on
The proximity of Site 2 to the DSU main campus, as well as the Commons, is a cri cal asset. It only takes a short
walk for students to get to the Health and Wellness Ins tute.
15
Página 99
Conceptual Site Plan
The proposed convoca on center will be served by a primary public entrance that faces the parking lot, a secondary public entrance off Crawford Carroll Avenue, which is mainly
for bus drop-offs, and an entrance for the Academic Health and Wellness Ins tute. Service and loading access to the building will be separate from the public entrances. Based
on the City of Dover’s requirements, a 4,800 seat facility requires approximately 1,600 spaces.
16
Delaware Convocation Center
Página 100
Conceptual Rendering of NCAA Basketball Game
As a basketball arena, the convoca on center will provide the facili es needed by the DSU Hornets to hone their skills, display their talent and further their game. While the
arena has not yet been designed, this architect’s conceptual rendering of the space shows a long span open room without columns, which is ideal for athle c events. This
illustra on shows the sea ng bowl at the maximum sea ng configura on with all the seats pulled out. The es mated number of spor ng events such as men’s and women’s
17 basketball and women’s volleyball is approximately 35 per year.
Página 101
Conceptual Rendering of Academic Space
The architect’s depic on of a classroom shows a space that can be used for a variety of func ons, serving academic, as well as community ac vi es. Par ons in the room allow
it to be sub-divided into three smaller classrooms, accommoda ng DSU’s academic programs and providing much needed academic space.
18
Delaware Convocation Center
Página 102
Conceptual Rendering of Academic Space/ Mul -use Ballroom
In addi on to serving as a classroom, the room is designed to be flexible in use and accommodates a variety of ac vi es such as community mee ngs, banquets and more.
Equipped with audiovisual equipment, Wi-Fi capabili es, and furniture storage, this mul purpose room will be ac vely used throughout the day and night.
19
Página 103
Phase I Cost
In order to accurately assess the convoca on center’s
viability, it is vital to establish an es mate for the cost
of designing and building the facility. The cost es mate
below put together by EDIS and Barton Malow reflects
EDIS’ knowledge of local construc on condi ons
and standards in Dover, as well as Barton Malow’s
experience with convoca on centers. These figures
are based upon the team’s recommenda ons in terms
of facility size and preliminary concept designs.
Construc on Costs $46.0 M
(includes con ngency, general condi ons, insurance and bonds etc.)
“The cost model used for
this study allows for a Other Project Costs $8.4 M
building design that provides (professional fees, furniture, equipment, con ngency etc.)
extraordinary low cost pricing
value while maintaining a high An cipated Cost Escala on (2017) $3.1 M
quality, funcƟonal building that
meets the program needs of Grand Total Project Cost $57.5 M
the university ” - EDiS Company,
Wilmington, DE
20
Delaware Convocation Center
Página 104
Conceptual Rendering of Entry Lobby
With mul ple entry points, the lobby serves the patrons a ending events at the arena, as well as students and faculty heading to the Health and Wellness Ins tute. The
concourse on the upper level provides a variety of patron ameni es such as the cket office, concessions, restrooms and more.
Página 105
Projected Impact
Job Crea on Delaware and 230 are es mated to be new jobs in the
City of Dover.
The construc on and on-going opera ons of the
Delaware Convoca on Center will create much- The total long-term, permanent jobs created from
needed jobs in the local economy. These jobs the on-going opera ons of the Delaware Convoca on
will include not only direct full and part- me jobs Center are es mated to range from 130 to 180 full and
created temporarily during construc on of the part- me jobs (stated in FTEs), depending on the level
facility spanning jobs such as construc on workers, of opera ons achieved by the venue. Approximately
tradesmen and manufacturers of raw materials three-quarters of the jobs created during the venue’s
and building supplies, but also more permanent opera ons are an cipated new jobs created in the City
full- and part- me jobs during the on-going annual of Dover and about one-third would be considered
opera ons of the facility including jobs such as facility new jobs in the State of Delaware.
opera ons personnel (i.e. management, marke ng,
finance, human resources, maintenance, event Events and A endance
services, administra on, etc.), event-day staff (i.e.
box office a endances, cket takers, ushers, security, Based on extensive market research, annual event
concession workers, parking a endants, traffic control and a endance levels were es mated for the
personnel, etc.) and community support personnel proposed Delaware Convoca on Center. Two sets of
in areas such as hotel, restaurant, entertainment, es mates were developed: a “base case” scenario
retail, transporta on and other such industries. represen ng the event and a endance levels that
The full-effect of employment impacts in the local are es mated to be reasonably achievable on an
economy will be further realized as ini al construc on annual basis, and “best case” scenario represen ng
and opera ons spending are re-spent within the an opera ng level that reflects successful, aggressive
community, suppor ng the crea on of addi onal facility management that results in above-peer venue
“Great way to build revenue indirect and induced job impacts. opera ons.
and bring people here to the Overall, the Delaware Convoca on Center is es mated
middle of the state.” - comment to temporarily generate a total of 760 full and part-
me jobs (stated in full- me equivalents) during
by survey respondent construc on. Of this amount, 510 construc on-period
FTEs are es mated to be new jobs in the State of
22
Delaware Convocation Center
Página 106
The table (Fig. 5) summarizes the event and
a endance es mates for the proposed
Delaware Convoca on Center under the Phase I
building program scenario. It should be noted that
these event and a endance totals do not include use
of classrooms or athle c and academic offices, athle c
prac ces, student recrea onal ac vi es or other such
day-to-day use of the facility that would take place in
addi on to the specific event types included in the
es mates.
The proposed Delaware Convoca on Center is
es mated to host 144 to 176 annual events with
annual a endance of approximately 116,250 to
153,350. Approximately 60 percent of convoca on
center events and a endance are es mated to be
derived from non-DSU community events. In the event
that Phase II of the project is completed in the future,
annual a endance levels are es mated to increase
by approximately 15 percent, due primarily to the
facility’s ability to a ract addi onal concert, family
show and spor ng event ac vity assuming a larger
sea ng capacity.
Financial Opera ons
The table (Fig. 6) presents the es mated opera ng
revenues and expenses es mated to result from
convoca on center opera ons during a normalized
year of opera ons. As shown, it is an cipated that
Delaware State University would likely need to make
Fig. 5 forecasts the number of events and poten al a endance.
23
Página 107
an annual opera ng contribu on of $27,000 under the Economic Impacts
best case to $224,500 under the base case.
Reflec ve of a true town-and-gown partnership, a The opera ons of the proposed Delaware Convoca on
mul -purpose, community-oriented convoca on Center would generate economic impacts to the City,
center will benefit the central and southern Delaware County and State on an annual basis as a result of
region through the crea on of spending, jobs, tax visita on and expenditures associated with Delaware
revenues and hotel rooms and enhancement in the Convoca on Center opera ons and events. The table
quality of life for local residents, while Delaware State (Fig. 7) presents a summary of the gross economic
University benefits from facility revenues generated impact and fiscal revenues es mated to be generated
from non-university events which will serve to by the proposed Delaware Convoca on Center during
significantly reduce the required annual university a normalized year of opera ons.
contribu ons which could approach upwards of
$700,000 as a DSU-only venue. Facility opera ons are es mated to generate
approximately $5.4 to $7.2 million per year in direct
If Phase II of the building program is constructed, spending. Coun ng this ini al direct spending and
opera ng revenues are es mated to increase by the subsequent rounds of re-spending that would
approximately 10 percent due to increased a endance impact the local economy through a mul plier effect,
and event ac vity. However, opera ng expenses are the total economic ac vity (output) generated by
es mated to increase by approximately eight percent Delaware Convoca on Center opera ons is es mated
due to the increased size and volume of the facility, to range from $7.0 to $9.4 million per year, suppor ng
addi onal staffing needs, increased maintenance 130 to 180 jobs with $2.5 to $3.4 million in annual
costs and other such considera ons. Therefore, the earnings. Over a 30-year period, the net present value
Fig. 6 illustrates the best and worst case scenarios with net financial opera ons following the comple on of (“NPV”) of total output generated by the Delaware
regard to opera ng revenues and expenses. Phase II are es mated to be largely similar to those Convoca on Center is es mated to range from $135
presented for Phase I in the table to the right. million to $183 million.
These financial opera ng es mates do not include Should full build-out of Phase II of the building
capital reserve funding or poten al debt service program be completed, the economic impacts
payments associated with facility funding. associated with the proposed Delaware Convoca on
Center are es mated to increase by approximately 15
to 20 percent, due primarily to an assumed increase in
24
Delaware Convocation Center
Página 108
the number of events such as concerts, family shows Based on discussions with project stakeholders, a
and spor ng events that could draw addi onal non- review of past efforts regarding poten al public
local a endees to the Dover area. assembly funding in Dover, an assessment of poten al
taxes and other public revenue streams, and other
Hotel Room Demand such considera ons, it is likely that the majority of
funding for the proposed Delaware Convoca on
By drawing out-of-town visitors to the area, the Center will be derived from state funding and
Delaware Convoca on Center will generate room poten ally be supplemented by a number of other
nights to benefit local hotel opera ons. Overall, it is community funding sources.
es mated that demand for approximately 11,000 to
14,500 new hotel room nights will be created annually It appears the most reasonable funding approach
in the Dover area from visi ng event personnel, would include State of Delaware general fund
out-of-town patrons, business suppliers and others contribu ons, DSU general fund contribu ons, private
in connec on with the on-going opera ons of the and other possible community funding sources.
Delaware Convoca on Center.
Management Op ons
Funding Analysis
The Delaware Convoca on Center will be owned by
It is es mated that Phase I of the proposed Delaware DSU. However, given the likelihood that mul ple
Convoca on Center could cost approximately $57.5 par es will likely be required to fund the construc on
million to develop. Assuming an interest rate of 5.0 of the facility, it is recommended that an en ty such as
percent and 30-year bonds, annual debt service an authority, board or commission be established to
Fig. 7 shows the economic impact resul ng from the
payments could approximate $3.7 million annually if provide overall governance of the proposed Delaware
Delaware Convoca on Center
the en re amount is financed. Convoca on Center.
Historically, the development of convoca on centers, This governance en ty should include representa on
arenas, conference centers and other similar venues from various stakeholders to ensure that all relevant
o en involve varying degrees of partnerships between par es are included in key decisions pertaining to the
the public and private sectors. For facili es that are respec ve facili es they oversee. The appropriate
u lized for colleges and universi es for their assembly composi on of the governing en ty will ul mately
and athle c events, the college or university typically depend largely on the funding partners involved with
also par cipates in the funding of those facili es.
25
Página 109
facility development. The governing en ty should
have representa on from each project stakeholder,
which may include, but are not necessarily limited
to DSU, the State of Delaware, Kent County, the
City of Dover and poten ally representa ves of the
local and regional corporate community, hospitality
industry, the Delaware Sports Commission and other
relevant en es. This will ensure that the needs and
expecta ons of each stakeholder are considered when
se ng policies and making decisions.
While there may be several en es that par cipate
in funding the construc on of the venue, DSU should
be responsible for the venue’s daily opera ons and
provide any necessary contribu ons to support its
daily opera ons. To effec vely operate the venue,
DSU will need to directly hire a staff with significant
previous convoca on center opera ng experience
or consider outsourcing the management of the
venue to a private management company with the
requisite exper se. Third party management would
likely represent the most efficient and effec ve means
of opera ng the facility. The event es mates and
financial projec ons presented herein assume that the
proposed Delaware Convoca on Center is managed
by a competent and experienced arena management
company.
26
Delaware Convocation Center
Página 110
Conceptual Rendering of Trade Show Event
By retrac ng the first eight rows of seats, the event floor is enlarged and accommodates events such as concerts, trade shows and consumer shows. The es mated number of
non-athle c community events per year range from 86-113, a rac ng between 135,000-178,000 visitors.
27
Página 111
Conclusion
“Is it feasible for DSU and the City of Dover to have a
convocaƟon center?”
Having completed: The study finds that a convoca on center is:
• More than 10 months of research, analysis, • Feasible and should be pursued
workshops, presenta ons and feedback • DSU has a significant need for the educa onal
• Surveys of more than 300 people including facili es provided in the convoca on center
University students, faculty, staff, alumni, donors, • Growth in the number of students and
members of the Dover/Kent County-area business educa onal programs demand facili es like the
community, and residents of the surrounding area convoca on center to allow DSU to be a world-
• Extensive interviews with more than 150 groups class state educa onal facility
such as DSU, surrounding school districts, • Benefits the central and southern Delaware
business and professional associa ons, state community from joint-use of the convoca on
agencies and many more center due to the size and design of the facility for
public gatherings
• Has the poten al to boost the economic
development of central and southern Delaware
and the City of Dover
“Let’s get moving on this great • Funding for capital costs of the project will be
idea for Dover!” - comment by augmented by income-genera ng community
events such as concerts, trade shows,
survey respondent conven ons, spor ng events etc
• Opera ng costs to DSU and the State can be
significantly reduced by bringing in revenues from
public, community-use events
28
Delaware Convocation Center
Página 112
Architecture
Interior Design
Facility Programming
Master Planning
Environmental Stewardship
Holzman Moss Bo no Architecture, LLP
214 West 29th Street, 17th Floor
New York, New York 10001
www.holzmanmoss.com
ForeSite Facility Planners, LLC
214 West 29th Street, 17th Floor
New York, New York 10001
www.foresiteplan.com
Página 113
Monthly Report
July 2015
Office of City Assessor
Página 114
Assessor’s Report
Number of Deeds Stamped for Transfer Tax Dollar Amount for
the Month of July 2014/2015 the Month of July 2014/2015
26 27 $100
30 23
Thousands
25 $53 $53 $56 $50
20 14 15 15 $26
$50
15 $18 $13 $6
10 5 2014
1 2 1 2014
5 $0
0 2015 2015
First Time Buyer for the Month July 2014/2015 Realty Property
of July 2014/2015 Sales in Dollars Received Prior
to Recording
26 27
30
$4 $4 $3 $2 $4 $3
$4
Res. Non‐First
Millions
20 14 15 $3
Time Buyers $2 $1 $0
2014 $1
Res. First Time $0
10
Buyers 2015
0
2014 2015
Major Updates
May ‐ 15 June ‐ 15 July ‐ 15
Assessment Change ‐$87,308,570 ‐$33,394,930 ‐$1,042,600
Residential Sales Ratio Report
Sales in Study Total Assessed Total Sale Price Ratio PRD
Value
16 $2,143,100 $2,230,100 0.96 1.01
1
Página 115
Assessor’s Report
Ratio – Assessed Value divided by Sale Price.
PRD – Mean – A PRD above 1.03 tends to indicate assessment regressivity – high valued properties are under
appraised relative to low valued properties. A PRD below .98 tends to indicate assessment progressivity – high
valued properties are relatively over appraised.
Points of Interest
Scanning & Filing
‐ All new deeds are being scanned and attached to the CAMA software for easy retrieval.
‐ All appeal documents and correspondence are being scanned and attached to the CAMA software for
easy retrieval.
‐ All old property record cards are being scanned and indexed into Fortis.
Assessor’s Office
‐ 2015 Tax Bills were generated, printed, sorted and mailed
2
Página 116
AUG 11, 2015 CITY OF DOVER PAGE: 1
03:09 PM SALES RATIO REPORT CA324
PARID NBHD LUC ADDRESS UNITS STYLE YRBLT STORIES SFLA GRADE CDU TOTAL APPR SALE DT PRICE ASR
ED05-067.14-02-13.00 2 R10 12 FOREST CREEK DR 1 13 1975 2 1273 C- AV 81,200 23-JUL-15 114,000 .71
ED05-067.15-02-27.00 2 R10 232 N ANN AVE 1 16 1990 1 1578 C- AV 121,400 17-JUL-15 130,000 .93
ED05-067.15-03-21.00 2 R10 58 N ANN AVE 1 14 1956 1 864 C- AV 74,100 09-JUL-15 69,500 1.07
ED05-067.17-01-67.00 3 R10 42 SCIOTO CT 1 5 1980 2 2389 C+ AV 207,400 29-JUL-15 229,000 .91
ED05-068.18-04-15.00 7 R10 87 MITSCHER RD 1 14 1945 1 880 C AV 68,800 09-JUL-15 79,000 .87
ED05-076.03-04-02.00 11 R10 225 SAXONDALE LN 1 5 2008 2 2092 B+ AV 238,200 10-JUL-15 250,000 .95
ED05-076.05-02-26.00 14 R10 51 STONEY DR 1 8 1986 2 1893 C+ AV 140,700 22-JUL-15 159,900 .88
ED05-076.05-04-01.063 102 R50 46 PAR HAVEN DR 1 20 1978 1 481 C- AV 29,000 16-JUL-15 30,000 .97
ED05-076.05-08-03.00 3 R10 115 CHELSEA WAY 1 5 1998 2 2078 B- AV 214,900 27-JUL-15 200,000 1.07
ED05-076.08-02-27.00 9 R10 226 N QUEEN ST 1 2014 2 1695 C+ AV 130,800 15-JUL-15 145,000 .90
ED05-076.10-02-18.00 16 R10 17 MIFFLIN RD 1 14 1991 1 1786 C+ AV 156,600 15-JUL-15 161,500 .97
ED05-076.10-02-25.00 16 R10 31 MIFFLIN RD 1 5 1991 2 1343 C+ AV 126,000 10-JUL-15 149,800 .84
ED05-076.13-01-47.00 14 R10 132 THAMES DR 1 13 1995 2 1980 C+ AV 124,800 15-JUL-15 92,000 1.36
ED05-076.20-02-27.00 12 R10 1152 YEARSLEY DR 1 14 1963 1 1716 C GD 164,800 02-JUL-15 162,500 1.01
ED05-077.17-02-44.00 5 R10 960 MONROE TER 1 14 1959 1 1517 C+ AV 160,300 17-JUL-15 159,900 1.00
ED05-077.18-02-61.00 4 R10 27 EVERGREEN DR 1 14 1953 1 1064 C GD 104,100 06-JUL-15 98,000 1.06
Página 117
CITY MANAGER’S
MONTHLY REPORT
JULY 2015
City Manager’s Monthly Report, July 2015
Página 118
Customer Services
In the month of July, we processed 5,850 credit card payments for the month totaling $1,567,686.52.
Human Resources
Continued contract negotiations.
Library
517 attended 49 programs for adults.
333 attended 29 programs for teens.
833 attended 43 programs for children.
23 volunteers completed 600 hours of service.
156 attended 36 programs/classes coordinated through the Job Center.
Public Works
Working on CIP and additional funding for future street program and other projects.
2 City Manager’s Monthly Report, July2015
Página 119
CUSTOMER SERVICES
WORK ORDERS PROCESSED Extensions
382
of Credit398
3,000 400 358
2,500
308 292 300
2,161
2,053 2,075 300 268
2,018 1,998
2,000 1,855 1,861
1,749 211 208
1,570 1,599 1,630
1,437 200
1,500 1,298
1,000 100
500
0
Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Jul- Aug - Sep - Oct- Nov- Dec- Jan- Feb- Mar- Apr - May- Jun- Jul-
14 14 14 14 14 14 15 15 15 15 15 15 15 14 14 14 14 14 14 15 15 15 15 15 15 15
CUSTOMER PAYMENT USAGE CUTS FOR NON PAYMENT
80,000 $2,000,000
60,000 $1,600,000
40,000 $1,200,000
22,561
20,435
$800,000
20,000 6,573
2,636 6,035 1,923
2,611 181 180 1,921
$400,000 $316,426
0 165588.8
$837 $735
Drive-Thru Over the Mail, Drop Credit Bank $-
Window Counter Box Cards Drafts July 2015 July 2014 FYTD16 FYTD15
2016 YTD 2015YTD
FY 2016 FY 2015
Major Program Updates Jul 2015 Jul 2014 Difference
Year-to-Date Year-to-Date
Number of Customers Served 26,974 28,321 (1,347) 26,974 28,321
Final Bills 732 749 (17) 732 749
Estimated Bills 218 213 5 218 213
Penalties Posted $ 12,109 $ 16,242 (4,133) $ 12,109 $ 16,242
Extensions of Credit - Amount Extended $ 83,062 $ 54,976 28,086 $ 83,062 $ 54,976
Balance Transfers $ 2,471 $ 1,051 1,420 $ 2,471 $ 1,051
Utility Collections $ 42,394 $ 6,567 35,827 $ 42,394 $ 6,567
Special Assessments $ - $ - - $ - $ -
Miscellaneous Billings $ 83,704 $ - 83,704 $ 83,704 $ -
CNP through Disconnect Collars $ - $ - - $ - $ -
Court Cases $ - $ - - $ - $ -
Tamperings $ - $ - - $ - $ -
Taxes Levied $ 12,887,409 $ 10,914,894 1,972,515 $ 12,887,409 $ 10,914,894
Billing Adjustments $ (20,512) $ 283,632 (304,144) $ (20,512) $ 283,632
Total Taxes Collected $ 11,136,477 $ 9,397,419 1,739,058 $ 11,136,477 $ 9,397,419
Taxes Outstanding $ 1,730,420 $ 1,801,107 (70,687) $ 1,730,420 $ 1,801,107
Payments in Lieu $ - $ 27,227 (27,227) $ - $ 27,227
City Manager’s Monthly Report, July 2015 3
Página 120
HUMAN RESOURCES
Category July Aug Sept Oct Nov Dec Jan Feb Mar April May June July Total
14 14 14 14 14 14 15 15 15 15 15 15 15
Caucasian* 291 290 290 291 288 290 287 286 289 289 291 290 291 N/A
Minorities* 58 58 61 61 61 62 63 62 63 61 63 63 64 N/A
Hired 1 1 5 5 0 5 1 0 9 5 9 3 8 52
Terminated/ 2 2 2 4 3 2 3 2 5 7 4 4 4 44
Resigned/
Retired/Other
Transferred/ 0 1 0 3 5 1 0 0 0 0 0 4 0 14
Promoted
Jobs Posted 4 4 2 3 3 3 3 2 7 2 2 2 1 38
Workers Comp. Inju- 2 2 1 2 5 1 1 3 3 3 2 2 0 27
ries
Workers Comp. 86 160 51 22 32 2 17 29 312 97 231 115 260 1414
Hours
Insurance Claims 0 1 4 1 1 5 4 1 3 0 2 2 0 24
Full-time Employees: 332 Part-time Employees: 25(5 Pitts Center, 1 Recreation, 10 Library, 2 Customer Service, 1 Central Services, (6) Police Department)
-Numbers do not reflect, temporary, seasonal, relief fire dispatchers, committee or council members.
Positions Hired: Library Clerk (part-time); Field Supervisor I, Streets; Field Supervisor II Grounds; Electrical Engineer I, Electric Department;
Crime Analyst/Accreditation Manager (Police Department); Service Center Clerk (part-time, Pitts Center), LAN Analyst (Police Department); Customer
Service Clerk, (Customer Service)
Position Resigned/Retired/Terminated: (2) Police Officer, Utility Maintenance Mechanic I (Water, wastewater), Motor Equipment Operator I,
(Sanitation)
Positions Posted: Planner I
Recruitment Information (Positions closed in July)
Position Total Female Male Unknown Black White Hispanic Asian/Pacific American Unknown In Out
Islander Indian/Alaskan Dover Dover
Native
Planner I 5 1 3 1 1 3 - - - 1 1 4
Unfilled/Open Positions by Department*
Unfilled/Open Positions July Aug Sept Oct Nov Dec Jan Feb Mar April May June July
By Department 14 14 14 14 14 14 15 15 15 15 15 14 14
Electric 4 5 25 5 2 2 2 4 3 2 3 2 1
Public Works 11 11 12 11 12 12 12 13 15 13 17 16 17
Police 0 2 2 0 1 1 10 10 4 4 2 3 5
All Other Departments 4 3.5 4.5 5 5 3 3 4.5 4.5 5 4 6 10
Totals 20 21.5 23.5 21 20 18 28 29.5 26.5 24 26 27 33
*Not used for Budgeting Purposes
²
The following has been updated to reflected the Fiscal 2015-16 Budget
Electric: Lineman 1st Class
Public Works: (3) Utility Maintenance Mechanic I/Wastewater; Civil Engineer l; Public Works Inspector (Public Works); Motor Equipment
Operator I (Streets); Motor Equipment Operator II (Streets); (3) Motor Equipment Operator I (Sanitation); Nursery Person II (Grounds);
Nursery Person I (Grounds); Mechanic I; (2) Motor Equipment I Water/wastewater; Water Treatment Plant Operator I; Operations Manager
Police: (5) Police Officer
*Police Officer (4) 9/2015
All Other Departments: Building Supervisor (part-time, Pitts Center); (2) Customer Service Clerk (part-time), Librarian II; (2) Librarian I (part-time);
Library Clerk I (part-time), Administrative Assistant (Information Technology-part-time); Library Page (part-time); AS400/System Operator
(Information Technology); Planner I (Planning & Inspections); Accountant I (Finance); Key Accounts Representative (Customer Service); Generation
Manager (Electric)
4 City Manager’s Monthly Report, July2015
Página 121
HUMAN RESOURCES
continued
Turnover Statistics
2010 2011 2012* 2013 * 2014 2015
Total Turnover % 5.57 6.75 11.00 10.91 6.02 8.51
Termination Turnover % 0.27 1.08 0.29 1.47 .57 .28
Resignation Turnover % 2.12 4.05 5.21 5.01 2.29 5.11
Retirement Turnover % 3.18 1.62 5.50 4.42 3.15 3.12
* Healthcare cost sharing implemented
** Healthcare cost sharing implemented for DOE
Average Employees
2010 2011 2012* 2013* 2014 2015
Total Number of Employees Separating from 21 25 38 37 21 30
Service
Average Number of Full-time Employees 362 356 333 325 331 331
Average Number of Part-time Employees 16 15 12 14 18 21
* Healthcare cost sharing implemented
City Manager’s Monthly Report, July 2015 5
Página 122
INFORMATION TECHNOLOGY
Service Requests Resolved Programming Requests Completed
140 128 125 30 28
120 121
116
120 111
102 25 22
100 91 90 91
18 18 19
20 16 17 16
80 15
52 15 13
60 11
31
9
40 10
20 13 4
5
0
Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- 0
Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May- Jun- Jul-
14 14 14 14 14 14 15 15 15 15 15 15 15
14 14 14 14 14 14 15 15 15 15 15 15 15
Page Views - City of Dover Web Page
40,000
35,000
30,000
Pages Viewed
25,000
20,000
31,605 31,423 31,600 31,423 32,737 33,605
28,026 25,426 26,428 27,275 28,370
23,955
15,000
10,000 23,845
5,000
0
Jul- Aug - Sep - Oct- Nov- Dec- Jan- Feb- Mar- Apr - May- Jun- Jul-
14 14 14 14 14 14 15 15 15 15 15 15 15
Current
Performance Indicators Last Month Same Month
Month
Last Year
iSeries Availability 100% 100% 100%
Server Availability 100.00% 100% 100%
AS/400 Connections
(concurrent/authorized users)
N/A N/A N/A
PCs Supported 380 372 364
Scheduled PCs Replaced - - -
Servers Supported 30 30 19
People Trained 1 11 12
Availability Statistics based on 7:00 AM until 5:00 PM Monday—Friday
6 City Manager’s Monthly Report, July2015
Página 123
LIBRARY
Reference Transactions
1200
1000
800
600
400
200
0
Adult Teen Children
Jul 15
Adults – 1,437 Teens – 473 Children – 629
Circulation July 15 FYTD 16 July 14 FYTD 15
Dover residents 22,565 22,565 24,177 24,177
Ebooks 2,482 2,482 1,874 1,874
Kent residents* 13,863 13,863 16,886 16,886
Non-county residents 2,312 2,312 2,153 2,153
Registrations
Dover residents 389 389 443 443
Kent residents* 31 31 62 62
Non-county residents 6 6 11 11
Other
Visiting Patrons 28,012 28,012 27,119 27,119
Meeting Room Usage 1,297 1,297 1,387 1,387
Photocopier Usage 1,127 1,127 1,188 1,188
Computer Printing Usage 2,660 2,660 2,476 2,476
Computer Users 4,855 4,855 5,243 5,243
Wireless Computer Users 2,005 2,005 1,656 1,656
Holds (Total) 7,473 7,473 7,233 7,233
*Breakout of Kent County Residential Statistics
Circulation Registrations
Harrington: 169 Harrington: 1
Milford: 202 Milford: 0
Smyrna: 1,029 Smyrna: 3
Outside City Limits: 12,463 Outside City Limits: 27
Total Registered Users: (Card Holders)
City: 27,298 Kent County: 12,533 Outside Kent County: 1,058
Other Points of Interest:
Inter/Interlibrary: 68 items loaned out Technical services: 867 items added
39 items borrowed 627 items deleted
Volunteers: 600 hours of service completed
City Manager’s Monthly Report, July 2015 7
Página 124
PUBLIC WORKS
Administration
Administrative review and inspection services continued on all residential and commercial developments.
The following residential subdivisions are in various phases of construction:
Oak Shadows Emerald Pointe Eden Hill (Residential)
Patriot Village Clearview Meadows Village of Cannon Mill
Sanitation
Monthly Total Refuse (Tons) Sanitation Hours
1,500
895 869 869 925
1000
1,000 827 834 848 875
726 717 733
648 588 563 572
541
440 483
500 292
500
239 190
205 166 151 166 173 135 211 217 177 172
110
34 32
- 0
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Bulk Col lecti on Mechanized Hand Trash Contai ner
14 14 14 14 14 14 15 15 15 15 15 15 15 Collection Collection Repair/Del ivery
Bulk Automated Jul 15 Jul 14
JULY 15 FYTD 16 JULY 14 FYTD 15
Trips to DSWA Sandtown Landfill 190 190 197 197
Total Tonnage to DSWA 1,115.26 1,115.26 1,100.41 1,100.41
90-Gallon Containers Delivered 102 102 23 23
300-Gallon Containers Delivered 0 0 8 8
Total Man Hours-containers Delivered 34 34 32 32
CURBSIDE RECYCLING TOTAL # OF TOTAL # OF
STATS HOUSEHOLDS ACCOUNTS WEIGHT/LBS. AVE. LBS.
COLLECTED
July 2015 20,849 9,166 258,600 12.40
8 City Manager’s Monthly Report, July2015
Página 125
PUBLIC WORKS
continued
Streets JULY 15 FYTD 16 JULY 14 FYTD 15
Signed Installed 2 2 47 47
Signs Repaired 0 0 10 10
Curbs Painted Yellow (feet) 1,116 1,116 283 283
New Post Installed 1 1 4 4
Storm Catch Basins Repaired 7 7 0 0
Storm Catch Basin Repairing (Hrs.) 24 24 0 0
Storm Catch Basins Cleaned 246 246 2 2
Storm Catch Basins Cleaning (Hrs.) 28 28 4 4
Hot Mix Patching (Tons) 0 0 0 0
Hot Mix Patching (Hrs.) 0 0 0 0
Cold Mix Patching Hrs.) 13 13 56 56
Concrete Work (Hrs) 24 24 8 8
Concrete Patching (Cubic Yards) 0 0 0 0
Ditch Work (Hrs). 24 24 0 0
Street and Alley Maintenance (Hrs) 0 0 101 101
Street Sweeping (Miles) 1,049 1,049 1,480 1,480
Street Sweeping (Cubic Yards) 88 88 348 348
Grounds
Total Work Orders = 16 General = 6 Arborist = 10
Arborist Crew JULY 2015 JULY 2014
Trees Trimmed 30 28
Trees Removed 20 3
Stumps Removed 0 1
Mowed grass a good portion of the month
Trimmed multiple trees
Cut down multiple trees
Evaluate trees
Beautification Crew
Weeded and tiled flower beds
Worked in greenhouse
Sprayed flower beds
Water flower beds and hanging baskets
Mowing Crew
Mowed grass at various city locations
Sprayed weeds
Yard Repairs
City Manager’s Monthly Report, July 2015 9
Página 126
PUBLIC WORKS
continued
Geographic Information Systems (GIS)
Planning Created a GeoForm and model for Planning to track plan information
Planning & Inspections Used information from Tracey & Jason Osika to create an
Above Ground Storage Tanks layer. Used that to create a
1-mile buffer around the tanks to determine property
locations in relation to them.
Planning & Inspections Created maps of three locations in the City with buffer
layers around the major highways and train tracks.
Provided Tracey with PDF versions of the maps for her project.
Planning & Inspections Created a map of the DDD Boundary & the Habitat for
Humanity Downtown boundary for AMT. Provided a PDF
copy and printed out two 24"x36" copies.
Planning & Inspections Modified an existing map to show 381 College Rd along
with an inset map showing the sites location as being
outside the City's two National Historic Districts.
Planning & Inspections Created an Exhibit map for properties along Slaughter
City Manager's Office Street that the City owns and is trying to divest itself of.
Public Works Deactivated services to decrease locks
Public Works Troubleshoot issue with the link station and back it up.
Public Works Repaired the Water/Sewer/Storm Web App
Public Works GIS Completed the monthly update of Parcels, Active AHIs & rentals
Public Works Streets Completed a map book for Antonio.
Public Works Streets Modified the Community Maps to include stormwater.
Repathed existing layers. Removed all Fire Department
related layers. Printed out 8.5"x11" copies of each.
State of Delaware Created a GIS presentation for the Stevenson House student assembly
Fleet and Facilities Management
PM Work Orders Completed: 19 Number of Tire Repairs: 18 Number of Road Repairs: 12
Other Work Orders: 106 Repair Hours: 275.7 Road Repair Hours: 18
Total Work Orders: 125 Fabrication Hours: 15 Misc. Hours: 4
PM Hours: 97.5
# Of Scheduled PM’s: 42
# Of Scheduled PM’s Completed: 3
Major Program Updates
MEASURE July 2015 July 2014 DIFFERENCE
Fleet Maintenance - Scheduled 3 out of 42
Preventative Maintenance 7.14 % 4 out of 24
- 9.53%
appointments being kept (Quantity 16.67 %
and Percentage)
10 City Manager’s Monthly Report, July2015
Página 127
PUBLIC WORKS
Facilities Maintenance
Facilities - Routine work orders
29 out of 29 27 out of 28
completed within 5 days (Quantity +3.57%
100 % 96.43%
and Percentage)
Facilities - Emergency work orders
3 out of 3 1 out of 1
completed within 2 days (Quantity 0%
100% 100%
and Percentage)
Water/Wastewater
Water Production/Billed Consumption/Flow to
Kent County
255000000
205000000
155000000
105000000
55000000
5000000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
14 14 14 14 14 14 15 15 15 15 15 15 15
Total Water Prod. Billed Consumpt.
Total Flow to County City Readings
ENGINEERING SUMMARY
Major Program Updates JULY 15 JULY 14 DIFF FY16 YTD FY15
State and Federal Violations 0 violations 0 violations - - -
Water Quality Complaints 6 14 -8 6 14
Plan Review Completed With- 8 plans 11 plans
-3 8 11
in 30 days of Submission 100% 100%
OPERATIONAL SUMMARY
Task JULY 15 JULY 14 CURRENT FY
Water Production - Daily Average 5,828,452 4,982,645 180,682,000
Average Field Response Time (goal is <30 minutes) 13.5 19 13.5
Water Mains Repaired 0 2 0
Water Service Lines Repaired 5 1 5
Wastewater Mains Repaired 1 1 1
Wastewater Service Lines Repaired 0 0 0
Sewer Lines Flushed - linear feet 86,451 188,996 86,451
Sewer Mains Videoed -linear feet 640 232 640
Total Fire Hydrants in Service 1,819 1,819 1,819
Total Water Meters in City Distribution System 22 12 14,334
City Manager’s Monthly Report, July 2015 11
Página 128
ELECTRIC DEPARTMENT
System Peak Total System Load
200 100,000
158.2 152.4 155.6 158.5 73,066 76,060
69,215 68,704
135.4 135.8 63,151 65,517 62,574 61,012
80,000
60,195 60,236
150
114.8 120.6 55,747 54,958
51,470
104.9 101.1 104.7 103.8
90.95
60,000
100
40,000
50 20,000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
14 14 14 14 14 14 15 15 15 15 15 15 15 14 14 14 14 14 14 15 15 15 15 15 15 15
Outages Customers of Gained/Lost
35 8,000
20
25 6,000 15 14
Outages Customers
15 12
11 11 11
15 4,000
10 7 6 6
5 2,000 4 4 4
5 2
-5 Jul Sep Nov Jan Mar May Jul 0
0
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
14 14 14 15 15 15 15 14 14 14 14 14 14 15 15 15 15 15 15 15
Outages Customers
Outages: 9 Customers: 405
Electric Monthly Outage Report
The annual outage goal will be less than 295 Controllable Outages Average Response Time
minutes per customer, which is a Delaware Annual goal is less than 40 Goal is less than 30 minutes
Standard. This will be measured by calculating
the System Average Interruption Duration Index. Month Year-to-date Month Year-to-date
FY 16 YTD FY 15 FY 14
2 2 29 Minutes 29.0 Minutes
25.04 45.64 67.92
JULY 16 JULY 15 FY16 YTD
PROGRAM UPDATES
Tree Trimming 321 574 321
Number of Oil Releases 1 2 1
Lost Time Accidents – All Electric Utility Divisions 0 0 0
New Services 14 6 14
12 City Manager’s Monthly Report, July2015
Página 129
ELECTRIC DEPARTMENT
July 2015 Electric (EE Capitol Improvement Projects (CIP)
Project Number Description Update
Horsepond Substa-
EE1308 Progress: Work is Complete
tion
Progress: Foundation bids were received are awaiting approval by Council.
General Scott
Material has been allocated. Will be designing Fiber Optic in July.
EE1312 Switchgear
Replacement Schedule: FY16 construction tentatively scheduled for September.
Progress: Work activities are moving forward. Going to clear up a few issues
on N. Governors Blvd.
Capitol Park
EE1314
Upgrade Schedule: Scheduled for completion May 2015 weather permitting. A few
services on old N. Governors Blvd. section inner loop.
Progress: All poles & transmission lines are installed and energized. Remain-
ing poles need to be removed and distribution placed back to normal. Con-
tractor was pulled off project for 3 weeks for weather and storm damage
GOTP
(other areas). Complete as of 10 Jul 15.
EE1443 Transmission Line
Relocation Schedule: Work activities are moving forward & transmission portion should
be completed by early-July. City Crews to work on relocation of distribution
after Playtex and West Dover Connector.
Progress: Soil boring is complete and preliminary steel pole design complete.
69kV Rebuild Project Construction drawings to be started in July.
EE1500 (Horsepond to
Long Point)
Schedule: FY15 is for Design |FY16 budget is for construction.
Progress: State of Delaware requested project to be delayed to FY16.
EE1505 DNREC R&R
Schedule: Project on Hold | funds moved for other FY15 projects
Progress: All underground distribution work is complete on Kesselring Proper-
ty/New Burton Road |Work to begin on Saulsbury Road.
West Dover
EE1509 Connector -
State of DE Schedule: Planning on starting on Saulsbury Road after Playtex & Garrison
Oak.
Progress: City crews continuing the installation underground wire.
Town Point
EE1513 Distribution
Feeders Schedule: Project is under construction
Progress: No other work can proceed in development without contractor in-
stalling conduit
Chestnut Grove
EE1516
Subdivision Schedule: Not Scheduled | Contractor responsible for conduit installation in
development
Progress: Currently investigating the cables placement & engineering design.
69kV Cable Design continues in FY16 & construction in FY17.
Replacement –
EE1520
North St.
Substation Schedule: FY16 construction to begin.
City Manager’s Monthly Report, July 2015 13
Página 130
ELECTRIC DEPARMENT
continued
Progress: Primary underground cable was terminated & light standards are
Garrison Oak
installed.
Technical Park
EE1522
Infrastructure Schedule: Work activities are moving forward.
Phase 2
Progress: Material has been issued to contractor for installation. Temporary is
installed.
Lenders Lake
EE1524
Apartments Schedule: No Work Scheduled | Contractor responsible for conduit installa-
tion in development
Progress: All wire overhead & underground is installed (except underground
into College Road Subst.). Still awaiting second metering cabinet.
EE1526 Playtex Addition
Schedule: Termination of all wiring and digging into College Road expected in
August.
DAFB Temporary
EE1527 Progress: Work is Complete
Concrete Plant
W. Denney's
EE1529 Bridge Project - Progress: Work is Complete
State of DE
Bay Health URD
EE1530 Progress: Work is Complete
Relocation
Windstream DAF-
EE1531 Progress: Work is Complete
B/College Road
Dover Litho Pad
EE1532 Progress: Work is Complete
Sites 1 & 2
DE State Police
EE1533 Progress: Work is Complete
Generator Project
Hardees Rt. 13
EE1534 Progress: Work is Complete
Damage
Eden Hill Lights
EE1535 Progress: Work is Complete
Phase 1
Progress: Preliminary Design complete & Fee Schedule established. Waiting
on owner to agree to fees prior to any further work on project. This is the 3rd
Troutman time customer requested & previous (2) two instances, customer declined.
EE1536
Machines
Schedule: No work scheduled
Progress: Preliminary Design complete.
Kirby & Holloway
EE1537
Restaurant
Schedule: No work scheduled
Progress: Currently in Design
North Street
EE1538 Sidewalk
Improvements
Schedule: No Work Scheduled
14 City Manager’s Monthly Report, July2015
Página 131
ELECTRIC DEPARMENT
continued
Progress: Preliminary design is complete. Waiting on owner to agree to pro-
Keystone ject prior to any continuation of work.
EE1539
Automotive
Schedule: No Work Scheduled
College Road Progress: Currently design is complete.
EE1540 Substation PT
Replacement Schedule: Waiting on Material
Blue Hen Progress: Some work has been performed on Phase 1.
EE1541
Corporate Ctr. Schedule: Work activities are moving forward.
Westminster
EE1542 Progress: Work is Complete
Village
Habitat for
EE1543 Humanity S. Progress: Work is Complete
Kirkwood St.
Progress: Currently design is complete. Contractor has received material for
installation.
Nottingham
EE1544 Meadows -
Wellington Ave Schedule: No Work Scheduled | Contractor responsible for conduit installa-
tion in development
Firefly Lights -
EE1545 Progress: Work is Complete
Persimmon Tree
Progress: Complete and awaiting contractor installation to energize service.
EE1546 Del Tech Signs
Schedule: Work activities are moving forward.
Progress: Contractor has installed conduit &equipment pads. Received ease-
NBR Properties ments and payments.
EE1547
New Burton Rd
Schedule: Work activities are moving forward.
City Manager’s Monthly Report, July 2015 15
Página 133
City Planner’s Monthly Report
Planning, Inspections & Recreation
JULY 2015
Planning, Inspections &
Recreation Highlights
Sports Camps - Our summer sports
camps included Girls Beginner La-
crosse with 18 registrants, Soccer hosted 14 youngsters, and Volleyball hosted 16 girls.
Our August camps will include Basketball, Field Hockey and Football.
Softball Leagues - Men’s Southern Division Softball regular season ended with Allison’s
Auto Body (12-4) claiming the regular season Championship. Alison’s then defeated Vin-
cenzo’s to win the playoffs as well.
The Co-Ed Softball League Playoffs saw Team Pink defeat Knight’s Fine Jewelry to claim
the championship.
Spring & Summer Performing Arts on The Green - Our concert this year has received
many positive comments. July’s line up included Reptile World with 92 attendees (due to
rain held inside), the Island Boys Band played to a crowd of 297, The Reunion entertained
285, Imagine performed to a crowd of 277 and The Shakers played to a inside crowd of 78
due to rain.
Silver Lake Commission - Letters were prepared and mailed to lake side property owners
and licensed boaters noting the plan to open the Silver Lake Valve from Oct. 5 - 17, 2015.
With a Clean Up Day slated for Saturday, October 17.
Ann Marie Townshend, Dawn Melson-Williams, Bill Cook, and Tracey Harvey attend-
ed the APA Planning Law webinar and Land Use Law Review presentation by Max
Walton. This training session was sponsored by the APA Delaware Chapter.
Página 134
Planning, Inspections & Recreation Revenue
FY '16 Budget FY '16 Actual
Revenue Stream
Looking Forward…...
Business License $1,425,000 $ 1,337,494 94%
Trailer License $21,000 $ 9,855 47% Fall Programming
Building Permits $600,000 $ 58,701 10%
Cert. of Occupancy $6,500 $ 280 4%
Public Occupancy $9,700 $ 250 3%
Lodging House $14,100 $ 98 1%
Plumbing/Heating/Air $75,000 $ 4,851 6%
Rental Permit Fee $350,000 $ 1,391 0%
Miscellaneous $15,000 $ 695 5%
Fire Protection Fees $62,000 $ 5,416 9%
Code Enforcement $25,000 $ 3,375 14%
Vacant Building Reg. $100,000 $ 21,570 22%
Total P&I Revenue $2,703,300 $ 1,443,977 53%
Recreation $149,000 $ 9,045 6%
PLANNING OFFICE
The Planning Office is part of the review process for certain types of construction activity permits (Building
Permits, Sign Permits, etc.) and Certificate of Occupancy permits. For July 2015, Planning Staff was in-
volved with review of 74 Permits and 8 Certificates of Occupancy permits. (2015 calendar year total of 549
Permits and CO’s compared to 545 for 2014). Planning Staff also reviews new applications for Business Li-
censes and Rental Dwelling Permits.
COMPREHENSIVE PLAN IMPLEMENTATION
Planning Staff continues to focus on the various implementation items identified in the 2008 Comprehensive
Plan as amended.
On-going efforts of the Planning Office include and research for future ordinance amendments related to
the to residential uses in the RG-1 and RG-2 zones related to Downtown redevelopment and infill pro-
jects, the Recreational and Commercial (RC) zone and temporary activities.
The Planning Office is also involved in the following studies and projects: City Recreational Needs
Assessment, Restoring Central Dover Community Plan, and Transportation Improvement Districts.
Página 135
Construction Activity
Project work remains to complete the site improvements at the new Dover High School for
the eastern areas of the site including the baseball/softball field areas and associated build-
ings. Temporary Certificates of Occupancy are in place for the high school building and
stadium/athletic field areas with conditions. A Project Coordination meeting is scheduled
for early July to discuss project status (C-10-05/S-11-18)
For the Leander Lakes Apartments project, the foundation and building construction con-
tinues on the community center building and three apartment buildings. The apartment
complex is located south of Forrest Avenue/Route 8 and west of Dover High Drive. (S-12-
18)
The Planning Staff continues to participate in coordination conference calls with Calpine
regarding the Garrison Energy Center project at 450 Garrison Oak Drive (Lot 7 of the Gar-
rison Oak Technical Park). The project construction is in the final stages for the Garrison
Energy Center Phase 1 (S-12-17). The Planning Office continues to wait for receipt of
State DNREC permits for the Above Ground Storage Tank before approving the Adminis-
trative Site Plan (S-14-20) for the addition of a Fuel Oil Tank.
With construction activities finishing at the Uzin Utz Manufacturing facility at 200 Garri-
son Oak Drive (Lot 12 of the Garrison Oak Technical Park), a Temporary Certificate of
Occupancy was issued in July. (S-13-20)
A Summary of Construction Activity permitting is given below along with information on
the Downtown District Incentives authorized.
JULY 15 FY2015‐2016
New Home Permits Issued 2 2
Value of Commercial Projects $6,184,736 $6,184,736
Downtown Incen ves (Fees Waived) $1,441 $1,441
The OSCAR Building ‐ Delaware State University
Página 136
BOARD AND COMMISSION ACTIVITY
Planning Commission
The Planning Commission met on July 20, 2015. The next Planning Commission meeting is
scheduled for August 17, 2015. The following applications were considered:
C-14-04 109 East Division Street: Professional Office – Following Re-evaluation Review
approval was granted to the Conditional Use Site Plan to establish the professional office
within the existing building subject to conditions. Also approved a plan amendment to re-
duce the four (4) parking spaces requirement to three (3) parking spaces.
Z-15-03 Lands of Barrett at 35 and 39 North New Street: Rezoning from RG-1 to RG-3 –
Recommended approval of rezoning the two properties from RG-1 to RG-3 and with refer-
ence to the reasons stated in the DAC Report including that the rezoning is consistent with
the Comprehensive Plan, the Restoring Central Dover Plan and the Downtown Develop-
ment District.
US-15-01 Winner Volkswagen and Subaru: Comprehensive Signage Plan—Granted ap-
proval of the Comprehensive Signage Plan for the property consisting of freestanding and
wall signage.
As part of the Annual Meeting of the Planning Commission, Fred Tolbert was elected to serve
a Chairman and Kathleen Still was elected to service a Vice-Chairman. Appointments were
also made to the Architectural Review Oversight Subcommittee of the Planning Commission.
Board of Adjustment
The Board of Adjustment met on July 15, 2015. The next regular scheduled meeting of the
Board of Adjustment is scheduled for August 19, 2015. The following application was con-
sidered:
V-15-10 Modern Maturity Center at 1121 Forrest Avenue. Variance approved for an in-
crease in the maximum permitted sign area in order to allow construction of a 59 SF monu-
ment sign.
Historic District Commission
The Historic District Commission met on July 16, 2015. The next Historic District Commis-
sion meeting is scheduled for August 20, 2015. There were no new applications for Architec-
tural Review Certification. Information was provided on application and permit activity with-
in the Historic District. There was discussion of Information on Permits with Architectural Re-
view Certification issued by Staff for the Wayside Signage on The Green for the First State
National Historical Park and related to an exterior renovation project at 15 & 21 The Green.
Página 137
COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM
CDBG FY15 Projects
Homeownership Assistance Program
CDBG funds will be used to provide homeownership assistance to first-time homebuyers
who purchase affordable housing in the Downtown Development District Target Area.
Dover Interfaith Mission for Housing
CDBG funds will be used for operations cost for the shelter.
Connections Community Support Program
CDBG funds will be used to provide rapid re-housing/rental assistance services for
homeless households within the City.
Milford Housing Homeowner Rehabilitation Program
CDBG funds will be used to rehabilitate existing owner occupied housing in the City that
is in violation of the City’s Housing Code and complete emergency home repairs to elim-
inate housing conditions that threaten the health and safety of low income homeowners.
Habitat for Humanity
CDBG funds will be used to rehabilitate an existing home to provide affordable housing
to a family in the Downtown Development District Target Area.
Peoples Place Whatcoat Homeless Shelter
CDBG funds will be utilized for minor renovations to a facility that shelters the homeless.
Mayors Challenge to End Veterans Homelessness
The Mayor’s Task Force for Ending Veterans Homelessness has set a second goal to house
15 veterans for its 200th day celebration that has been scheduled on September 18th where
the Mayor will host a barbeque. The 100th Day Celebration was held on June 12th at the
Kent County Levy Court Building where it was announced the Task Force exceeded its
goal and housed 24 veterans within 100 days.
Página 138
Dangerous Buildings, Vacant Buildings & Demolitions
200 N. West Street—The owners obtained a permit in June of 2014. Since that time mini-
mal work has been done to the property and no inspections have been scheduled. The per-
mit is due to expire on June 9, 2015. Once the permit expires, the owners will be notified
that the property will be taking to City Council for authorization for demolition.
1370 College Road—Demolition has begun on the structure.
5 Welch Drive—Demolition is complete.
307 W. Division Street —All repairs have been made by the home-owner.
312 W. Loockerman Street—Notice was sent to the lien holders to make repairs to the va-
cant structure by January 6, 2015, or City Staff would schedule a date with Council to de-
clare the building dangerous and request to have the building demolished. On February
19th the City Historic District Commission ruled that Demolition by Neglect was occur-
ring and recommended the owner have 6 months to make repairs or to have the building
demolished. On March 9th City Council declared the building dangerous and the owner
was given until September 9, 2015 to repair or demolish the building.
311 N Governors Avenue—Owner was giving until August 13th to make repairs or the
City would have the structure demolished.
363 Rita-Wilma Way—The two abandoned mobile homes on this lot have been con-
demned as unfit for human occupancy and boarded. The lien holders and the property
owner have been notified to make repairs or demolish the homes by December 29, 2014.
When no repairs were made to the homes, the structures were presented to City Council
on March 9, 2015. The owners were giving until May 9th to repair or demolish the struc-
tures. The owner has obtained Demolition Permits for the mobile homes. Demolition has
begun to the mobile homes.
110 Rustic Lane—This building was condemned by City Staff and the dangerous building
process has begun. The home was boarded and a lien search has been requested. The
property will be presented to City Council on July 27th.
222 W. Reed St—City Staff brought forward this property to City Council on May 26,
2015, and requested that the structure be demolished. The owner requested additional
time to make repairs and City Council gave the owner until August 26, 2015, to make the
repairs.
Vacant Buildings—During the month of July, thirty-one (31) additional buildings were
registered as vacant, and $4,500.00 in vacant building registration fees were collected.
Página 139
Code Enforcement Activity—JULY 2015
Case Type # cases current # cases % staff ini ated % staff ini ated
month YTD current month YTD
No valid Rental Permit 3 134 100% 96%
No valid Building Permit 6 31 50% 68%
Tall grass and weeds 49 431 47% 70%
Unregistered vehicle 1 17 100% 88%
Abandoned vehicle 7 63 57% 78%
Annual Housing Inspec on 10 192 70% 89%
Property Maintenance – 60 379 50% 65%
Exterior
Electric Termina on 21 126 5% 25%
Dover Code of Ordinances 36 360 64% 75%
Zoning 9 53 89% 58%
Total Cases 202 1788
Total # of Inspec ons For 291
Month
528 Bay Road
110 Rus c Lane
Página 140
Fire Marshal’s Office, Building Inspections & Licensing Summary
LIFE SAFETY July15‐June16 July14‐June15
Inspec ons JULY 15 FYTD 16 JULY 14 FYTD 15
Annual Fire/Life Safety Inspec ons 55 55 14 14
Fire/Code/DCO Complaints 59 59 18 18
Inspec on Deficiencies from AFI 106 106 52 52
C/O & Acceptance Tests
15 15 8 8
Administra ve Walk Thru 12 12 8 8
Plan Review 14 14 ‐ ‐
Accidental $165,400 $437,100 $20000.00 $20000.00
Incendiary $0 $73,600 $0.00 $0.00
Undetermined $150,000 $22,900 $0.00 $0.00
PERMITTING AND LICENSING
Permits Issued
JULY 15 FYTD 16 JULY 14 FYTD 15
Administra ve Permit 4 4 4 4
Building Addi on/Renova on Permits 34 34 49 49
Building Permits
26 26 23 23
Demoli on Permits
5 5 7 7
Fence Permits 8 8 7 7
Fire Preven on Permits 19 19 6 6
Mechanical Permits
24 24 15 15
Plumbing Permits
26 26 24 24
Sign Permits 12 12 24 24
Swimming Pool Permits
1 1 5 5
Business Licenses
780 780 455 455
Merchant Licenses
196 196 126 126
Contractor Licenses
527 527 275 275
Lodging House Licenses
2 2 0 0
Mobile Homes
103 103 112 112
Public Occupancy 5 5 10 10
Rental Dwelling 29 29 21 21
BUILDING INSPECTIONS
Inspec ons JULY 15 FYTD 16 JULY 14 FYTD 15
Building
335 335 329 329
Plumbing/Mechanical
278 278 255 255
Cer ficate of Occupancy 9 9 12 12
Página 141
Fire Marshal’s Office—At a Glance
Deputy Fire Marshal Matthew Brown investi-
gated a large loss accidental fire located at 102
S. Queen Street. Total loss was valued at
$150,000 when a two story single family home
that is converted into several apartments
caught fire. The Fire Alarm System that was
recently installed as required by this office
possibly saved several occupants lives due to
the early notification from the Fire Alarm Sys-
tem. Fire Protection saves lives!
Recreation Division
Enrollment Summary
JULY FY 2016 verses JULY FY 2015
1200
1000
800
600 FY15
400
FY16
200
0
General Trips Camps
Recreation
Category FY14 FY15
General Recrea on 88 113
Sports 59 7
Trips 0 0
Leagues 992 572
Camps 318 344
Página 142
Revenue Breakdown: July 2015 verses July 2014
General Recreation General Re creation
Sports Sports
Trips Trips
Leagues Leagues
Building & Field Rentals
Building & Field Rentals
Camps
Camps
Camp Small Wonder
Camp Small Wonder
General Recreation $472.00 General Recreation $268.50
Sports 0 Sports $425.00
Trips 0 Trips 0
Leagues $8400.00 Leagues $5475.00
Building & Field Rentals $612.50 Building & Field Rentals $1525.00
Camps $725.00 Camps $664.00
Camp Small Wonder $450.00 Camp Small Wonder $1350.00
Página 143
John W. Pitts Recreation Center – JULY 2015
Total Program Attendance Facility Usage By The Hour
20,000 1,000
15,000 800
600
10,000
400
5,000 200
0 July 14 0 July 14
Aug 14
Sept 14
Oct 14 Aug 14
Sept 14
Nov 14
Dec 14 Oct 14
Nov 14
Dec 14
Jan 15
Feb 15
Mar 15 Jan 15
Feb 15
Apr 15
May 15 Mar 15
Apr 15
May 15
June 15
July 15 June 15
July 15
Facility Usage By The Hour JULY 15 FYTD 16 JULY 14 FYTD 15
Open Gym 180 180 233.5 233.5
Fitness Classes 34 34 43.75 43.75
Leagues 107.5 107.5 70 70
Camps 520.5 520.5 432 432
Sports Classes 0 0 13.5 13.5
Meetings & Rentals 19.5 19.5 16.5 16.5
Enrichment Classes 0 0 0 0
Total Facility Usage Hours 861.5 861.5 809.25 809.25
Daily Program Attendance** JULY 15 FYTD 16 JULY 14 FYTD 15
Total 5,428 5,428 4,081 4,081
Open Gym 162 162 260 260
Fitness Classes 184 184 257 257
Leagues 4,300 4,300 2,370 2,370
Camps 443 443 636 636
Sports Classes 0 0 161 161
Meetings & Rentals 339 339 397 397
Enrichment Classes 0 0 0 0
Since our opening in late April 2008, we have had 391,755 guests at the John W. Pitts Recreation Center.
July Open Gym Registrations and Packages Sold
Packages Sold: JULY MTD YTD FYTD
Daily: 1 $3 1 $3
Individual Quarterly: 0 $0 0 $0
Individual Annual: 0 $0 4 $0
Family Quarterly: 0 $0 3 $0
Family Annual: 0 $0_ 1 __ $0__
Revenue: $3 $3
Página 144
CITY OF DOVER
FINANCE AND PROCUREMENT & INVENTORY DEPARTMENTS
JULY 2015 - MONTHLY BUDGET REPORTS
PLEASE NOTE – THIS REPORT PROVIDES TOP LINE INFORMATION ON THE OPERATING
FUNDS. IF YOU WOULD LIKE ADDITIONAL INFORMATION, PLEASE FEEL FREE TO
CONTACT THE FINANCE DEPARTMENT.
Página 145
CITY OF DOVER
ACTIVITY REPORTS
JULY 2015
FINANCE DEPARTMENT ACTIVITY LEVELS
FY15 YTD FY16 YTD
BANK TRENDS
Number of Deposits Made (Hand, ACH & Wire, Lockbox) 647 643
Total Amount of All Deposits $ 17,911,153 $ 20,527,375
PAYROLL
Hours % Amount Hours % Amount
Gross wages per registers 68,081 100.0% $ 1,567,440 72,041 100.0% $ 1,749,387
Wages and Hours Worked
Regular 54,078 79.4% $ 1,151,705 55,678 77.3% $ 1,208,124
All over time 3,076 4.5% $ 127,282 3,733 5.2% $ 169,879
Other Paid or Unpaid Wages and Hours
Vacation 5,329 7.8% $ 148,388 4,680 6.5% $ 136,298
Sick 1,699 2.5% $ 42,000 1,101 1.5% $ 26,225
Terminal Leave - Retiree Vacation/Sick Payout 1,473 2.2% $ 41,056 3,893 5.4% $ 142,459
Comp Time 942 1.4% $ 26,741 598 0.8% $ 17,575
Personal 185 0.3% $ 5,727 176 0.2% $ 5,556
Leave Without Pay 480 0.7% $ - 455 0.6% $ -
Other (description below) 820 1.2% $ 24,541 1,729 2.4% $ 43,270
Other includes: pay adjustments, military differential pay, training, committee meetings, worker compensation tracking/adjustments, etc.
Other Activity
Number of Pay Periods 2 2
Number of Payroll Checks & Direct Deposits Issued 745 775
Number of Pension Checks Issued 254 253
Total Pension Benefits Paid - Defined Benefit Plan $ 432,177 $ 434,785
ACCOUNTS PAYABLE
Number of Check Vouchers 341 0
Number of EFT Vouchers 114 0
Vouchers Dollar Amount Disbursed $ 2,242,147 $ -
PROCUREMENT & INVENTORY ACTIVITY LEVELS
Contingency & Warehouse Stock
$2,800,000
$2,700,000
$2,600,000
Total Dollar Value
$2,500,000
$2,400,000
$2,300,000
$2,200,000
$2,100,000
$2,000,000
Series2 Series3
Value: $2,577,380 Line Items: 1,432
Fuel Use
Unleaded: 10,705.1 gallons
Diesel: 6,446.0 gallons
Total Cost: $ 34,782
Página 146
City of Dover
Finance Department
Monthly Report – July 2015
General Fund Summary
8%
Budget YTD Balance Budget
Beginning Balance $ 3,977,500 $ - $ 3,977,500 0.0%
Revenues
Court of Chancery Fees 1,065,100 - 1,065,100 0.0%
Police Extra Duty, Fines & Revenue 1,235,300 29,761 1,205,539 2.4%
Franchise Fees 672,300 - 672,300 0.0%
Grants 623,500 - 623,500 0.0%
Intrafund Services 5,231,200 359,727 4,871,473 6.9%
Library & Recreation Revenues 671,000 15,101 655,899 2.3%
Licenses & Permits 2,861,300 1,489,747 1,371,553 52.1%
Property Taxes (Includes BID Revenue) (1) 12,894,200 12,409,398 484,802 96.2%
Miscellaneous Revenues 57,700 561 57,139 1.0%
Sanitation Revenues 2,580,000 213,838 2,366,162 8.3%
Garrison Farm Rent Revenue 93,700 15,177 78,523 16.2%
Transfers-In from Special Funds & Utilities
Municipal Street Aid Fund 564,200 - 564,200 0.0%
Civil Traffic Penalties 450,000 - 450,000 0.0%
Transfer Taxes 1,340,000 181,734 1,158,266 13.6%
Verizon & Other Reserves 63,200 - 63,200 0.0%
Police Grants/Extra Duty 74,400 - 74,400 0.0%
Water/Wastewater Fund 850,000 70,833 779,167 8.3%
Electric Fund 10,000,000 833,334 9,166,666 8.3%
Total Revenues 41,327,100 15,619,211 25,707,889 37.8%
Total Beginning Balance & Revenues $ 45,304,600 $ 15,619,211 $ 29,685,389 34.5%
Expenditures
City Clerk & Council $ 501,500 $ 30,679 $ 470,821 6.1%
Mayor, City Manager & Human Resources 1,210,300 98,572 1,111,728 8.1%
Police & Police Extra Duty 15,761,400 863,714 14,897,686 5.5%
Public Services 4,669,500 297,501 4,371,999 6.4%
Engineering 181,400 3,526 177,874 1.9%
Procurement & Inventory, Facilities Mgmt., Fleet Maint. 2,036,200 130,514 1,905,686 6.4%
Planning, Inspections, Life Safety, Code Enf., & Economic Dev. 2,338,300 111,088 2,227,212 4.8%
Finance, Info Tech & Customer Services 2,807,800 278,245 2,529,555 9.9%
Library & Recreation 2,239,500 138,137 2,101,363 6.2%
Fire Department 745,400 137,820 607,580 18.5%
Assessor 234,800 21,621 213,179 9.2%
Contribution to DDP 70,000 - 70,000 0.0%
Miscellaneous Grant Expense 25,000 - 25,000 0.0%
Other Employment Expenses 520,100 - 520,100 0.0%
Bank & CC Fees 10,600 1,310 9,290 12.4%
Insurance 690,000 236 689,764 0.0%
OPEB - Retiree’s Health Care Contribution 1,895,600 157,967 1,737,633 8.3%
Police Pension Trust Contribution - State Grant 500,000 47,500 452,500 9.5%
Appropriation to Police Pension Fund 570,000 - 570,000 0.0%
Street Lights 797,700 67,698 730,002 8.5%
Debt Service 660,800 249,710 411,090 37.8%
Transfers Out
Inventory Write-offs 10,000 - 10,000 0.0%
Capital Projects Fund 2,625,400 - 2,625,400 0.0%
Verizon Reserve 50,000 - 50,000 0.0%
Uncollectibles: Trash & Other 50,000 - 50,000 0.0%
Total Expenditures 41,201,300 2,635,838 38,565,462 6.4%
Budget Balance - Working Capital 4,103,300 - - 0.0%
Total Budget Balance & Expenditures $ 45,304,600 $ 2,635,838 $ 42,668,762 5.8%
Reserve Balances
Contingency $ 720,300 $ 720,334
(1) Property Taxes are the taxes billed and not cash received. The outstanding receivable balance as of 7/31/15 is $1,430,828
as compared to $1,547,061 in July 2014.
Página 147
City of Dover
Finance Department
Monthly Report – July 2015
Water/Wastewater Fund Summary
8%
Budget YTD Balance Budget
Beginning Balance - Water $ 861,600 $ - $ 861,600 0.0%
Beginning Balance - Wastewater 293,400 - 293,400 0.0%
1,155,000 - 1,155,000 0.0%
Revenues
Water Fees 6,200,000 508,541 5,691,459 8.2%
Wastewater Fees 3,728,000 364,614 3,363,386 9.8%
Wastewater Treatment Services 3,026,500 289,963 2,736,537 9.6%
Groundwater Inflow Adjustment 1,864,300 185,636 1,678,664 10.0%
Water Tank Space Leases 341,900 3,207 338,693 0.9%
Miscellaneous Service Fee 67,000 4,417 62,583 6.6%
Impact Fees - Water 250,000 6,654 243,346 2.7%
Impact Fees - Wastewater 250,000 6,021 243,979 2.4%
Total Revenues 15,727,700 1,369,053 14,358,647 8.7%
Total Beginning Balance & Revenues $ 16,882,700 $ 1,369,053 $ 15,513,647 8.1%
Expenses
Water/Wastewater Operating Divisions
Engineering & Inspection $ 517,500 $ 24,010 $ 493,490 4.6%
Water Department 673,300 33,036 640,264 4.9%
Water Treatment Plant 1,910,000 90,646 1,819,354 4.7%
Wastewater Department 968,600 41,072 927,528 4.2%
Kent County Treatment Charge 4,130,000 344,167 3,785,833 8.3%
Intrafund Service Fees 1,492,700 92,625 1,400,075 6.2%
Retiree's Health Care 178,600 14,883 163,717 8.3%
Debt Service 1,132,100 42,709 1,089,391 3.8%
Other Employment Expenses 20,000 - 20,000 0.0%
Bank & CC Fees 46,200 1,019 45,181 2.2%
Transfers Out
General Fund 850,000 70,833 779,167 8.3%
Contingency Reserve 32,000 - 32,000 0.0%
Water I & E Fund 1,800,000 - 1,800,000 0.0%
Wastewater I & E Fund 1,500,000 - 1,500,000 0.0%
Total Expenses 15,251,000 755,000 14,496,000 5.0%
Budget Balances
Budget Balance - Working Capital - Water 1,048,600 - 1,048,600 0.0%
Budget Balance - Working Capital - WW 583,100 - 583,100 0.0%
Total Budget Balances 1,631,700 - 1,631,700 0.0%
Total Budget Balances & Expenses $ 16,882,700 $ 755,000 $ 16,127,700 4.5%
Reserve Balances
Contingency-Water $ 137,700 $ 105,188
Contingency-Wastewater $ 191,100 $ 190,209
Impact Fee Reserve - Sewer $ 1,309,500 $ 1,742,652
Impact Fee Reserve - Water $ 202,000 $ 427,523
Bond Coverage Ratio (Covenant 1.20) 4.30 6.97
Página 148
City of Dover
Finance Department
Monthly Report – July 2015
Electric Revenue Fund Summary
8%
Budget YTD Balance Budget
Beginning Balance $ 6,177,600 $ - $ 6,177,600 0.0%
Revenues
Direct Sales to Customers 78,279,200 7,558,547 70,720,653 9.7%
Utility Tax 1,281,100 122,984 1,158,116 9.6%
Weyandt Hall Rents 202,600 12,214 190,386 6.0%
Miscellaneous Revenues 725,200 99,713 625,487 13.7%
Interest Earnings 47,900 372 47,528 0.8%
Transfer from Rate Stabilization 3,000,000 750,000 2,250,000 25.0%
Total Revenues 83,536,000 8,543,830 74,992,170 10.2%
Total Beginning Balance & Revenues $ 89,713,600 $ 8,543,830 $ 81,169,770 9.5%
Expenses
Power Supply & Generation
Hedged Energy $ 23,402,600 $ 2,670,864 $ 20,731,736 11.4%
Power Supply Management 996,000 83,000 913,000 8.3%
Capacity Charges 10,225,100 890,225 9,334,875 8.7%
Dover Sun Park Energy 2,313,900 241,720 2,072,180 10.4%
Renewal Energy Credits (Incl. Solar) 1,036,800 40,142 996,658 3.9%
RGGI 175,000 - 175,000 0.0%
PJM Charges - Energy 7,966,100 156,552 7,809,548 2.0%
PJM Charges - Transmission & Fees 7,932,500 505,236 7,427,264 6.4%
Total Power Supply 54,048,000 4,587,739 49,460,261 8.5%
Plant Operations 6,434,600 561,203 5,873,397 8.7%
Generation Fuels 1,167,300 210,029 957,271 18.0%
Capacity Credits (10,472,100) (902,146) (9,569,954) 8.6%
PJM Spot Market Energy (1,708,300) (281,682) (1,426,618) 16.5%
PJM Credits (360,000) (85,793) (274,207) 23.8%
Total Generation (4,938,500) (498,389) (4,440,111) 10.1%
Total Power Supply & Generation 49,109,500 4,089,350 45,020,150 8.3%
Electric Operating Divisions:
Transmission/Distribution 4,068,600 217,877 3,850,723 5.4%
Electrical Engineering 1,335,800 59,540 1,276,260 4.5%
Administration 839,300 34,302 804,998 4.1%
Meter Reading 360,500 25,905 334,595 7.2%
Systems Operations 679,800 39,887 639,913 5.9%
Intrafund Services 3,738,500 267,102 3,471,398 7.1%
Utility Tax 1,281,100 122,984 1,158,116 9.6%
OPEB Trust Contribution - Unfunded Liability 1,030,000 85,833 944,167 8.3%
Retirees Health Care 537,800 44,817 492,983 8.3%
Interest on Deposits 20,500 1,546 18,954 7.5%
Green Energy Payment to DEMEC 128,000 12,264 115,736 9.6%
Accounts Receivable Write-Offs 200,000 - 200,000 0.0%
Other Employee Expenses 72,000 - 72,000 0.0%
Bank & CC Fees 242,300 18,797 223,503 7.8%
Debt Service 3,402,000 283,496 3,118,504 8.3%
Transfers Out:
General Fund 10,000,000 833,334 9,166,666 8.3%
Electric Improvement & Extension Fund 3,500,000 - 3,500,000 0.0%
Transfer to Insurance Reserve 10,000 - 10,000 0.0%
Transfer to Contingency Reserve 13,000 - 13,000 0.0%
Total Expenses 80,568,700 6,137,034 74,431,666 7.6%
Budget Balance - Working Capital 9,144,900 - 9,144,900 0.0%
Total Budget Balance & Expenses $ 89,713,600 $ 6,137,034 $ 83,576,566 6.8%
Reserve Balances
Contingency Reserve $ 844,600 $ 822,677
Insurance Reserve $ 758,700 $ 740,642
Rate Stabilization Reserve $ 4,602,600 $ 6,755,354
Bond Coverage Ratio (Covenant 1.25) 2.62 6.85
Megawatt Hours Sold & Purchased
Sales to Customers MWh (excluding Street Light MWh) 712,390 68,293 9.6%
Sales per MWh $ 109.88 $ 110.68 100.7%
Purchased/Generated MWh 741,522 76,867 10.4%
All In MWh Supply & Generation $ 66.23 $ 53.20 80.3%
Página 149
City of Dover
Finance Department
Monthly Report – July 2015
General Capital Project Fund Summary
8%
Budget YTD Balance Budget
Beginning Balance - Projects $ 154,800 $ - $ 154,800 0.0%
Revenues
Interest Earnings 5,000 98 4,902 2.0%
Income from Sale of Assets 20,300 - 20,300 0.0%
Transfer from General Fund for Projects 2,625,400 - 2,625,400 0.0%
Total Revenues 2,650,700 98 2,650,602 0.0%
Total Beginning Balance & Revenue $ 2,805,500 $ 98 $ 2,805,402 0.0%
Expenditures
Fire $ 145,600 $ 145,614 $ (14) 100.0%
Grounds Maintenance 201,100 - 201,100 0.0%
Life Safety 55,700 - 55,700 0.0%
Police 262,100 - 262,100 0.0%
Streets 1,428,500 6,000 1,422,500 0.4%
Sanitation 449,000 - 449,000 0.0%
City Manager 24,700 - 24,700 0.0%
Mayor 84,000 - 84,000 0.0%
Total Expenditures 2,650,700 151,614 2,499,086 5.7%
Budget Balance - Projects 154,800 - 154,800 0.0%
Total Budget Balance & Expenditures $ 2,805,500 $ 151,614 $ 2,653,886 5.4%
Reserve Balances
Capital Asset Replacement Reserve $ 916,500 $ 915,129
Parkland/Recreation $ 296,700 $ 320,796
Página 150
City of Dover
Finance Department
Monthly Report – July 2015
Water/Wastewater Improvement & Extension Fund Summary
8%
Budget YTD Balance Budget
Beginning Balance - Water $ 833,500 $ - $ 833,500 0.0%
Beginning Balance - Wastewater $ 1,055,900 $ - $ 1,055,900 0.0%
Revenues
Interest Earnings 25,000 628 24,372 2.5%
Transfer from Operating Fund for Water 1,800,000 - 1,800,000 0.0%
Transfer from Operating Fund for Wastewater 1,500,000 - 1,500,000 0.0%
Transfer from Impact Fee Reserve - Wastewater 165,000 - 165,000 0.0%
Total Revenues 3,490,000 628 3,489,372 0.0%
Total Beginning Balance & Revenues $ 5,379,400 $ 628 $ 5,378,772 0.0%
Expenses
Water $ 2,028,600 $ - $ 2,028,600 0.0%
Wastewater 1,822,100 - 1,822,100 0.0%
Total Expenses 3,850,700 - 3,850,700 0.0%
Budget Balance - Working Capital - Water 617,400 - 617,400 0.0%
Budget Balance - Working Capital - Wastewater 911,300 - 911,300 0.0%
Total Budget Balances 1,528,700 - 1,528,700 0.0%
Total Budget Balances & Expenses $ 5,379,400 $ - $ 5,379,400 0.0%
Reserve Balances
Capital Asset Replacement - Water $ 518,500 $ 515,966
Capital Asset Replacement - Wastewater $ 515,200 $ 512,616
Página 151
City of Dover
Finance Department
Monthly Report – July 2015
Electric Improvement & Extension Fund Summary
8%
Budget YTD Balance Budget
Beginning Balance $ 3,623,600 $ - $ 3,623,600 0.0%
Revenues
Interest Earnings 26,700 489 26,211 1.8%
Transfer from Electric Revenue Fund 3,500,000 - 3,500,000 0.0%
General Service Billing 1,900,000 - 1,900,000 0.0%
Total Revenues 5,426,700 489 5,426,211 0.0%
Total Beginning Balance & Revenues $ 9,050,300 $ 489 $ 9,049,811 0.0%
Expenses
Electric Generation $ 1,655,000 $ 4,583 $ 1,650,417 0.3%
Transmission/Distribution 2,887,600 70,742 2,816,858 2.4%
Electrical Engineering 1,724,300 169 1,724,131 0.0%
Total Expenses 6,266,900 75,494 6,191,406 1.2%
Budget Balance - Working Capital (Unaudited) 2,783,400 - 2,783,400 0.0%
Total Budget Balance & Expenses $ 9,050,300 $ 75,494 $ 8,974,806 0.8%
Reserve Balances
Depreciation Reserve $ 10,066,400 $ 9,957,873
Future Capacity Reserve $ 10,218,000 $ 10,107,899
City of Dover
Finance Department
Monthly Report – July 2015
Community Transportation Improvement Fund
8%
Budget YTD Balance Budget
Beginning Balance $ 144,000 $ - $ 144,000 0.0%
Revenues
Grants Revenue 500,000 - 500,000 0.0%
Interest Earned 500 14 486 2.8%
Total Revenues 500,500 14 500,486 0.0%
Total Beginning Balance & Revenues $ 644,500 $ 14 $ 644,486 0.0%
Expenses
Program Expenses - Del Dot $ 644,000 $ - $ 644,000 0.0%
Total Expenses 644,000 - 644,000 0.0%
Budget Balance - Working Capital 500 - 500 0.0%
Total Budget Balances & Expenses $ 644,500 $ - $ 644,500 0.0%
Página 152
City of Dover
Finance Department
Monthly Report – July 2015
Police Grant Funds
8%
Budget YTD Balance Budget
Beginning Balance $ 125,000 $ - $ 125,000 0.0%
Revenues
State & Federal Grants Received 527,300 5,000 522,300 0.9%
Interest Earnings - 52 (52) 0.0%
Total Revenues 527,300 5,052 522,248 1.0%
Total Beginning Balance & Revenues $ 652,300 $ 5,052 $ 647,248 0.8%
Expenses
Cadet Program $ 80,300 $ 4,005 $ 76,295 5.0%
Equipment & Program Supplies 410,600 4,180 406,420 1.0%
Technology Equipment 20,000 - 20,000 0.0%
Telephone/Fax 15,000 2,216 12,784 14.8%
Training/Conference/Food/Travel 17,000 - 17,000 0.0%
Consulting/Audit Fees 1,000 - 1,000 0.0%
Operating Transfers - Out 74,400 - 74,400 0.0%
Total Expenses 618,300 10,401 607,899 1.7%
Budget Balance - Working Capital (Unaudited) 34,000 - 34,000 0.0%
Total Budget Balances & Expenses $ 652,300 $ 10,401 $ 641,899 1.6%
Página 153
City of Dover
Finance Department
Monthly Report – July 2015
Library Grant Fund
8%
Budget YTD Balance Budget
Beginning Balance $ 17,300 $ - $ 17,300 0.0%
Revenues
Grants Received 278,900 - 278,900 0.0%
Federal Grants 2,500 - 2,500 0.0%
Total Revenues 281,400 - 281,400 0.0%
Total Beginning Balance & Revenues $ 298,700 $ - $ 298,700 0.0%
Expenses
Program Expenses/Supplies-State Grants $ 26,600 $ 2,438 $ 24,162 9.2%
Office Supplies 24,000 912 23,088 3.8%
Printing/Duplicating 13,200 - 13,200 0.0%
Postage 100 - 100 0.0%
Books 129,200 44 129,156 0.0%
Furniture 3,100 - 3,100 0.0%
Audio Visual Supplies 75,100 116 74,984 0.2%
Training/Conference/Food/Travel 2,000 - 2,000 0.0%
Contractual Services 900 - 900 0.0%
Office Equipment/Repairs & Maintenance 6,000 33 5,967 0.6%
Other Equipment - Lease 1,200 147 1,053 12.3%
Total Expenses 281,400 3,690 277,710 1.3%
Budget Balance - Working Capital 17,300 - 17,300 0.0%
Total Budget Balances & Expenses $ 298,700 $ 3,690 $ 295,010 1.2%
City of Dover
Finance Department
Monthly Report – July 2015
After School Program/Substance Abuse Prevention Fund
8%
Budget YTD Balance Budget
Beginning Balance $ 41,000 $ - $ 41,000 0.0%
Revenues
Grants Received 55,700 - 55,700 0.0%
Recreation Revenue 33,000 450 32,550 1.4%
Total Revenues 88,700 450 88,250 0.5%
Total Beginning Balance & Revenues $ 129,700 $ 450 $ 129,250 0.3%
Expenses
Temporary Help/Benefits $ 60,200 $ 9,761 $ 50,439 16.2%
Program Expenses/Supplies 55,700 4,796 50,904 8.6%
Total Expenses 115,900 14,557 101,343 12.6%
Budget Balance - Working Capital 13,800 - 13,800 0.0%
Total Budget Balances & Expenses $ 129,700 $ 14,557 $ 115,143 11.2%
Página 154
City of Dover
Finance Department
Monthly Report – July 2015
CDBG Fund
8%
Budget YTD Balance Budget
Beginning Balance $ 2,100 $ - $ 2,100 0.0%
Revenues
Grants Received 265,400 713 264,687 0.3%
Interest Earnings - 14 (14) 0.0%
Total Revenues 265,400 727 264,673 0.3%
Total Beginning Balance & Revenues $ 267,500 $ 727 $ 266,773 0.3%
Expenses
Closing Cost/Down Payment Program $ 60,000 $ - $ 60,000 0.0%
Connection Community Supply Program 7,400 - 7,400 0.0%
Dover Interfaith Ministry 27,000 - 27,000 0.0%
MHDC Emergency Home Repair 88,200 - 88,200 0.0%
Habitat For Humanity 40,000 - 40,000 0.0%
NCALL Research Inc. - - - 0.0%
Peoples Place 6,800 - 6,800 0.0%
Salaries 36,000 - 36,000 0.0%
Total Expenses 265,400 - 265,400 0.0%
Budget Balance - Working Capital 2,100 - 2,100 0.0%
Total Budget Balances & Expenses $ 267,500 $ - $ 267,500 0.0%
Página 155
Monthly Report
July 2015
Economic Development Office
Página 156
2015_07 Economic Development
Bi-weekly conference call with Garrison Energy Center
Worked with Economic Development staff to update website
Assisted Grey Fox Grille with Verizon tree problem
Met with Lighthouse Construction to discuss electric hookup issues
Contacted Whiting Turner regarding door issues at E-ZPass
Participated in Parking Committee parking lot survey
Attended Leads Group meeting at R&R R
Met Lou Stackeni from Applied Bank regarding DDD financing
Participated in GAMSA conference call with DEDO
Economic Development staff meeting with Dr. Casson to review Inclusion Study
Presented Economic Development Initiatives to Mike Harrington’s business group
Attended monthly DEED meeting
Met with Colonial Investments regarding expansion of Nemours facility
Met with Osman Sammander regarding DDD funding
Attended DDD meeting with Delaware State Housing Authority
Attended Honorary Commander briefing at Dover Air Force Base
Attended Plant Managers meeting
Attended Central Delaware Chamber of Commerce board meeting
Attended planning meeting with Uzin Utz regarding grand opening
Met with Paul Lakeman regarding Organization Committee
Contacted DELDOT Secretary regarding speaking engagement in August
Provided incentive information for potential new grocery store in Dover
Attended GOTP progress meeting
Reviewed draft sales agreement for Advantech
Attended SAP announcement at Delaware State University
Attended Food Innovation District meeting
Attended meeting with Gerri Street and Mitch May to discuss DDP future plans
Meeting with downtown merchants and Mayor to discuss downtown issues
Attended a Pop-up location assessment visit
Met with the Mayor at Hirsh Industries to discuss potential expansion plans
Attended Bayhealth Business and Investment Committee meeting
Met with Restoring Central Dover Economic Development Working Group
Met with the new President of Wesley College and the Mosaic Group
Página 157
Measures:
1 Maintain an unemployment rate for the City of Dover that is lower than national and state
averages
2013-2014 Actual 2014-2015 Actual 2015 - 2015 Actual
Results <10% unemployment rate in < 10% unemployment rate in <10% unemployment rate in
June 2014 June 2015 June 2016
6.1 % - US Rate 5.3 % - US Rate 5.3% - US Rate
6.9 % - DE Rate 4.7 % - DE Rate 4.7 % - DE Rate
8.3% - City of Dover Rate 7.4% - City of Dover Rate 7.1% - City of Dover Rate
June 2014 Actual June 2015 Actual July 2015 Actual
2 Monitor number of contacts with small businesses and with out-of-town companies
interested in locating in Dover
2013-2014 Actual 2014-2015 Actual 2015 - 2016 Actual
Results ≥20 contacts with potential >20 contacts with potential >20 contacts with potential
small businesses; small businesses; small businesses;
23 contacts YTD 20 Contacts YTD 4 Contacts YTD
≥11 contacts with out-of-town >11 contacts with out-of-town >11 contacts with out-of-town
companies interested in companies interested in companies interested in
locating in Dover locating in Dover locating in Dover
13 Contacts YTD 16Contacts YTD 2 Contacts YTD
2015_7 Downtown Dover Partnership
Provided technical assistance to five (5) prospective small business individuals on overall
business development within the Downtown Dover Business District
Continued providing technical assistance to five (5) prospective small business individuals on
locating available space within the downtown district to lease
Provided nineteen (19) hours of Technical Assistance to merchants located in the Downtown
Business Corridor
Telephone conference with Leah daPonte from Language Liaisons, LLC regarding future
translation services of program and website materials.
Telephone conference with Representatives from Network Solutions regarding the renewal of
our Website Domain Name
Telephone Conversation with Sonia Aquilar from DEDO regarding agenda for the July 27
Hispanic Economic Development Subcommittee Meeting
Completed final proof of Downtown Dover Partnership Annual Report’ 14
Telephone Conference with Sybil White from Governor’s Advisory Council for Exceptional
Citizens regarding the logistics for the ADA 25 Event
Facilitated the DDP Parking Committee Annual Parking Lot Inspection
Página 158
Telephone conference with Megan Clapp from Dover Rent All Tents regarding the logistics and
set-up for the ADA 25 Event
Submitted Event Permit with Dover Police for the First Friday Event in July
Facilitated the logistical set-up for the First Friday Event in July
Telephone conference with Daniel Gordon from Backyard Bouncers regarding billing process
Telephone conference with Pastor Jean Pearce from World Outreach Ministries regarding usage
of the Loockerman Way Plaza for Community Assembly
Completed and submitted list of vacant properties to be considered for Project Pop Up to DEDO
Disseminated the Pop Up Project materials to downtown merchants, property owners and
realtors
Disseminated the “Minority Business Enterprise Construction Trades Forum” information to
merchants
Telephone conference with James Provo from the US SBA Office regarding scheduling future
Loan Workshops
Posted the Farmer’s Market Ad and materials on website
Conference call with Diane Laird from DEDO and DDP Staff to review the GAMSA Application
Provided Parking Committee with an update on current submitted Work Order on the
Governors Ave Parking Lot
Telephone conference with Lori Christiansen from the State regarding the permits for the ADA
25 Event
Met with Lorraine Thaw regarding the availability of 325 W. Loockerman Street
Met with William Neaton and Lou Stackeni from Applied Bank to discuss Resource Development
Posted Farmer’s Market flyers, posters and banners throughout the downtown corridor
Telephone conference with Charlie Rodriguez from R&R Realty regarding the use of the 326 W.
Loockerman Street lot for the Urban Music Festival scheduled for August 30th
Assisted with the coordination of logistics for the ADA 25 Event – Loockerman Way Plaza Site
Telephone conference with Kerri Hollyday from Dover Library on logistics for Comic Con Event
Provided Brandon Cohen, Merchant Committee Chairman with updates on DDP Financial
Reports and program developments
Updated Calendar of Events and posted information on website
Created Dining Guide and posted information on website
Conference Call with Lisa Fitzgerald from the USDA regarding Program Grant Award notification
Conference Call with Wanda Anderson from Wesley College regarding Homecoming Parade and
activities
Telephone conference with Maggie Pleasant from NCALL regarding available space for a
Rehab/Preservation Office in downtown
Attended the Restoring Central Dover Steering Committee Meeting
Telephone conference with Renee McGlothlin from Wesley College on logistics for the
Homecoming activities
Disseminated Project Pop up information to the downtown distribution list
Página 159
Submitted Work Order (electric, street closures, etc.) for First Friday Event
Met with Dr. Michael Casson from DSU and DDP Staff to review the Inclusion Study Report
Facilitated requested from ADA 25 Event Planning Committee to have Mayor present
Proclamation for the event
Telephone conference with referral Daniel Rivera on available space to establish bakery
business in downtown Dover
Telephone conference with Elana Baukman from Wesley College re Homecoming Parade Route
Met with Troy Boxton to discuss update on submitted Small Business Development Loan
Reported accident that occurred at the ADA 25 Event – Loockerman Way Plaza site
Assisted Eagle Wings Ministries with logistics development for the scheduled August 1
Community Outreach Event
Telephone conference with Theresa Owens regarding Historic Commission Meeting date
Completed Parking Survey Feedback Report
Created layout template of Loockerman Way Plaza with assistance from Becker Morgan
Completed and submitted Project Pop Up application for 134 W. Loockerman Street property
Attended the Economic Development Work Group Meeting
Attended the Project Pop up Location Assessment
Scheduled Vacant Building Assessment tour for Deshawn Sheppard
Telephone conference with Technical Representatives from Network Solutions to evaluate DDP
Website Search Engine Rankings
Attended CenDel Tenants Meeting
Submitted Work Order (Electric, Trash Cans, etc.) for the Community Block Party Event
scheduled for August 1
Telephone Conference with Karen Williams from Keller Williams regarding future DDD Resource
Information Workshop
Telephone conference with Kristin Pleasanton regarding the Historic Preservation Write-Up
needed for the GAMSA application
Attended the Gulf War Memorial Committee Meeting
Telephone Conference with Stefanie Lancaster from Governor’s Office for People with
Disabilities regarding the ADA 25 event permits
Updated the Downtown Development District Vacancy Database
Updated the Parking Lot Survey Database
Página 160
MONTHLY REPORT
JULY 2015
Página 161
Date Range: From 07/01/2015 to 07/31/2015
Incident Run Log Company: All Companies
Dover Fire Department Sorted by: Not selected
Date FDID Incident# Alarm ### Address Suite Type Lgth
07/01/2015 30046 2015-000703 00:51 41 FOREST CREEK DR False alarm or false call, other 0.3
07/01/2015 30046 2015-000704 10:27 209 S STATE ST Detector activation, no fire - unintentional 0.2
07/01/2015 30046 2015-000705 18:02 74 HIDDEN VALLEY DR HazMat release investigation w/no HazMat 0.7
07/02/2015 30046 2015-000706 01:21 320 PERSIMMON CIR WEST Heat from short circuit (wiring), defective/worn 0.5
07/02/2015 30046 2015-000707 18:30 27 RIVERCHASE DR. Electrical wiring/equipment problem, other 0.3
07/02/2015 30046 2015-000708 21:11 30 HERITAGE DR Smoke detector activation, no fire - unintentional 0.2
07/03/2015 30046 2015-000709 13:22 30 LOOCKERMAN PLZ False alarm or false call, other 0.3
07/03/2015 30046 2015-000710 14:00 190 JOHN HUNN BROWN RD Unauthorized burning 0.1
07/03/2015 30046 2015-000711 20:33 SCARBOROUGH RD Assist police or other governmental agency 0.0
07/04/2015 30046 2015-000712 18:19 155 SPRUANCE RD Garbage dump or sanitary landfill fire 0.3
07/04/2015 30046 2015-000713 22:24 411 LEGISLATIVE AVE Good intent call, other 0.6
07/05/2015 30046 2015-000714 02:42 35 JERI LA Explosive, bomb removal (for bomb scare, use 721) 1.6
07/05/2015 30046 2015-000715 06:29 47 KAREN PLACE Steam, vapor, fog or dust thought to be smoke 0.4
07/05/2015 30046 2015-000716 09:54 730 LAKEWOOD PLACE False alarm or false call, other 0.3
07/06/2015 30046 2015-000717 00:37 317 W DIVISION ST Garbage dump or sanitary landfill fire 0.3
07/06/2015 30046 2015-000718 11:37 1255 S STATE ST False alarm or false call, other 0.3
07/06/2015 30046 2015-000719 15:59 1300 S FARMVIEW DR A Smoke detector activation due to malfunction 0.3
07/06/2015 30046 2015-000720 18:57 217 MILLCREEK DR False alarm or false call, other 0.3
07/06/2015 30046 2015-000721 22:27 177 WILLIS RD False alarm or false call, other 0.3
07/06/2015 30046 2015-000722 22:45 19 N NEW ST Assist police or other governmental agency 0.4
07/07/2015 30046 2015-000723 12:50 1080 SILVER LAKE BLVD Building fire 1.6
07/07/2015 30046 2015-000724 13:28 1525 MCKEE RD Sprinkler activation, no fire - unintentional 0.4
07/07/2015 30046 2015-000725 15:52 401 Doveview Drive Removal of victim(s) from stalled elevator 0.4
07/07/2015 30046 2015-000726 20:10 712 S GOVERNORS AVE Extrication, rescue, other 0.2
07/07/2015 30046 2015-000727 23:22 902 E DIVISION ST Animal rescue 0.3
07/08/2015 30046 2015-000728 11:27 631 RIDGELY ST Unintentional transmission of alarm, other 0.4
07/08/2015 30046 2015-000729 17:16 217 ROSE VALLEY SCHOOL RD Trash or rubbish fire, contained 0.9
07/08/2015 30046 2015-000730 22:37 60 UPLAND AVE Good intent call, other 0.4
07/10/2015 30046 2015-000731 08:03 764 LEIPSIC RD Smoke detector activation, no fire - unintentional 0.4
07/10/2015 30046 2015-000732 10:55 3098 N DUPONT HWY Smoke detector activation, no fire - unintentional 0.3
07/10/2015 30046 2015-000733 20:34 430 COLLEGE RD 700 Sprinkler activation due to malfunction 0.3
07/11/2015 30046 2015-000734 04:19 102 S QUEEN Building fire 5.2
07/11/2015 30046 2015-000735 06:05 22 FREEDOM DR Good intent call, other 0.3
07/11/2015 30046 2015-000736 06:10 100 ELECTRIC Assist police or other governmental agency 2.5
07/12/2015 30046 2015-000737 18:13 263 N DUPONT HWY Good intent call, other 0.3
07/12/2015 30046 2015-000738 21:50 109- WILLIS RD Good intent call, other 0.4
07/13/2015 30046 2015-000739 04:16 W NORTH ST Assist police or other governmental agency 0.5
07/13/2015 30046 2015-000740 11:32 120 N STATE ST Alarm system sounded due to malfunction 0.4
07/13/2015 30046 2015-000741 13:20 864 S STATE ST Detector activation, no fire - unintentional 0.3
07/13/2015 30046 2015-000742 15:12 800 BAY RD Electrical wiring/equipment problem, other 0.5
07/13/2015 30046 2015-000743 18:38 17 N AMERICAN AVE Cooking fire, confined to container 0.2
07/14/2015 30046 2015-000744 18:10 500 PERSIMMON TREE LA 8 Good intent call, other 0.4
07/14/2015 30046 2015-000745 18:31 631 RIDGELY ST System malfunction, other 0.3
07/15/2015 30046 2015-000746 23:50 725 HORSEPOND RD Medical assist, assist EMS crew 0.3
07/16/2015 30046 2015-000747 10:17 51 WEBBS LN O Gas leak (natural gas or LPG) 1.2
07/16/2015 30046 2015-000748 18:45 LOOCKERMAN ST Extrication of victim(s) from vehicle 0.6
07/17/2015 30046 2015-000749 18:44 631 RIDGELY ST System malfunction, other 0.3
07/18/2015 30046 2015-000750 00:15 903 WOODCREST DR Smoke detector activation due to malfunction 0.3
07/18/2015 30046 2015-000751 11:51 97 PAR HAVEN DR J System malfunction, other 0.7
07/19/2015 30046 2015-000752 17:46 30 OLD RUDNICK LA System malfunction, other 0.4
07/20/2015 30046 2015-000753 13:09 400 COURT ST Alarm system activation, no fire - unintentional 0.4
07/20/2015 30046 2015-000754 14:01 124 S STATE ST False alarm or false call, other 0.3
07/20/2015 30046 2015-000755 21:06 41 S NEW ST Outside rubbish fire, other 0.1
07/20/2015 30046 2015-000756 23:17 1080 SILVER LAKE BLVD Overheated motor 0.6
07/20/2015 30046 2015-000757 23:30 214 BAY TREE RD G Central station, malicious false alarm 0.3
07/21/2015 30046 2015-000758 10:19 19 OPAL PL CO detector activation due to malfunction 0.4
07/21/2015 30046 2015-000759 10:21 725 HORSEPOND RD Medical assist, assist EMS crew 0.3
07/21/2015 30046 2015-000760 11:06 298 S DUPONT WHY Passenger vehicle fire 0.4
07/21/2015 30046 2015-000761 13:03 725 HORSEPOND RD Medical assist, assist EMS crew 0.2
Date: 09/09/2015 Page: 1 Time:11:13
Página 162
Date FDID Incident# Alarm ### Address Suite Type Lgth
07/21/2015 30046 2015-000762 16:41 725 HORSEPOND RD Smoke detector activation due to malfunction 0.2
07/21/2015 30046 2015-000763 22:02 140 HAMAN DR Malicious, mischievous false call, other 0.4
07/22/2015 30046 2015-000764 01:16 120 N STATE ST Alarm system sounded due to malfunction 0.2
07/22/2015 30046 2015-000765 01:30 140 HAMAN DR False alarm or false call, other 0.2
07/22/2015 30046 2015-000766 12:19 428 N. DUPONT HIGHWAY Building fire 1.3
07/22/2015 30046 2015-000767 13:38 116 SHINNECOCK RD Carbon monoxide detector activation, no CO 0.1
07/22/2015 30046 2015-000768 13:57 116 SHINNECOCK RD Carbon monoxide incident 0.5
07/22/2015 30046 2015-000769 22:37 1200 N DUPONT HWY False alarm or false call, other 0.1
07/23/2015 30046 2015-000770 13:58 47 RIVERSIDE RD Gas leak (natural gas or LPG) 0.4
07/23/2015 30046 2015-000771 16:29 1365 N DUPONT HWY Extrication of victim(s) from vehicle 0.6
07/23/2015 30046 2015-000772 19:38 103 S GOVERNORS AVE Public service assistance, other 0.0
07/24/2015 30046 2015-000773 03:52 10 FAIRWAY LAKES DR A Smoke detector activation due to malfunction 0.3
07/24/2015 30046 2015-000774 11:55 29 S TURNBERRY DR Smoke detector activation due to malfunction 0.2
07/24/2015 30046 2015-000775 14:45 125 GREENTREE DR 1 Outside rubbish fire, other 0.2
07/24/2015 30046 2015-000776 18:24 1225 N DUPONT HWY Sprinkler activation due to malfunction 0.6
07/24/2015 30046 2015-000777 18:32 1131 N DUPONT HWY Passenger vehicle fire 0.3
07/24/2015 30046 2015-000778 20:00 230 BEISER BLVD Smoke detector activation due to malfunction 0.5
07/25/2015 30046 2015-000779 02:24 222 S DUPONT HWY Alarm system sounded due to malfunction 0.4
07/25/2015 30046 2015-000780 07:29 1180 WALKER RD Good intent call, other 0.3
07/25/2015 30046 2015-000781 10:47 222 S DUPONT HWY Removal of victim(s) from stalled elevator 0.3
07/25/2015 30046 2015-000782 12:54 903 WOODCREST DR Carbon monoxide incident 0.5
07/25/2015 30046 2015-000783 12:55 CECIL ST Rescue, EMS incident, other 0.2
07/25/2015 30046 2015-000784 13:50 239 N NEW ST Building fire 0.9
07/25/2015 30046 2015-000785 16:06 1261 S FARMVIEW DR CO detector activation due to malfunction 0.3
07/26/2015 30046 2015-000786 19:55 CENTRAL CHURCH RD Assist invalid 0.3
07/29/2015 30046 2015-000787 05:24 104 SAULSBURY RD Alarm system activation, no fire - unintentional 0.5
07/30/2015 30046 2015-000788 20:21 MARYLAND AVE Power line down 0.3
07/30/2015 30046 2015-000789 22:52 1340 W NORTH ST Passenger vehicle fire 0.3
07/31/2015 30046 2015-000790 07:29 381 COLLEGE RD Good intent call, other 0.5
07/31/2015 30046 2015-000791 13:15 1704 E LEBANON RD Dispatched & canceled en route 0.1
07/31/2015 30046 2015-000792 14:55 1704 E LEBANON RD Gasoline or other flammable liquid spill 0.8
07/31/2015 30046 2015-000793 16:58 1450 N DUPONT HWY 0587 Extrication of victim(s) from vehicle 0.5
Total Number of Incidents: 91
Total Length of Incidents: 43.3 Hours
Página 163
Property Type Report (Summary) Period From 07/01/2015 to 07/31/2015
Dover Fire Department
Count Pct of Total Est Total Est
Incident Type Incidents Loss Loss
000 Property Use, other
Totals 0 0.00% $0 0.0%
1 Assembly
110 Fixed-use recreation places, other 1 1.10% $0 0.0%
131 Church, mosque, synagogue, temple, chapel 3 3.30% $0 0.0%
155 Courthouse 1 1.10% $0 0.0%
161 Restaurant or cafeteria 1 1.10% $0 0.0%
Totals 6 6.59% $0 0.0%
2 Educational
200 Educational, other 1 1.10% $0 0.0%
213 Elementary school, including kindergarten 1 1.10% $0 0.0%
255 Day care, in residence, licensed 1 1.10% $0 0.0%
Totals 3 3.30% $0 0.0%
3 Health Care, Detention & Correction
311 24-hour care Nursing homes, 4 or more persons 2 2.20% $0 0.0%
321 Mental retardation/development disability facility 1 1.10% $0 0.0%
322 Alcohol or substance abuse recovery center 2 2.20% $0 0.0%
331 Hospital - medical or psychiatric 2 2.20% $0 0.0%
Totals 7 7.69% $0 0.0%
4 Residential
419 1 or 2 family dwelling 26 28.57% $0 0.0%
429 Multifamily dwelling 11 12.09% $0 0.0%
449 Hotel/motel, commercial 4 4.40% $0 0.0%
460 Dormitory-type residence, other 3 3.30% $0 0.0%
Totals 44 48.35% $0 0.0%
5 Mercantile, Business
500 Mercantile, business, other 1 1.10% $0 0.0%
519 Food and beverage sales, grocery store 3 3.30% $0 0.0%
559 Recreational, hobby, home repair sales, pet store 1 1.10% $0 0.0%
599 Business office 4 4.40% $0 0.0%
Totals 9 9.89% $0 0.0%
6 Industrial, Utility, Defense, Agriculture, Mining
Totals 0 0.00% $0 0.0%
7 Manufacturing, Processing
700 Manufacturing, processing 3 3.30% $0 0.0%
Totals 3 3.30% $0 0.0%
8 Storage
888 Fire station 1 1.10% $0 0.0%
891 Warehouse 1 1.10% $0 0.0%
Totals 2 2.20% $0 0.0%
9 Outside or Special Property
938 Graded and cared-for plots of land 2 2.20% $0 0.0%
960 Street, other 4 4.40% $0 0.0%
961 Highway or divided highway 4 4.40% $0 0.0%
962 Residential street, road or residential driveway 2 2.20% $0 0.0%
965 Vehicle parking area 5 5.49% $0 0.0%
Totals 17 18.68% $0 0.0%
NNN None
Totals 0 0.00% $0 0.0%
Date: 09/09/2015 Page: 1
Página 164
Property Type Report (Summary) Period From 07/01/2015 to 07/31/2015
Dover Fire Department
Count Pct of Total Est Total Est
Incident Type Incidents Loss Loss
UUU Undetermined
Totals 0 0.00% $0 0.0%
Totals 91 $0
Date: 09/09/2015 Page: 2
Página 165
FY 15-16 City Funded Account Balance Sheet
ACCOUNT BUDGET SPENT BALANCE
Apparatus Repairs & Maintenance $ 85,300.00 $ 10,481.16 $ 74,818.84
Building Maintenace Supplies $ 1,500.00 $ 1,500.00
Command Vehicle $ 50,000.00 $ 33,650.00 $ 16,350.00
Contractual Services $ 10,500.00 $ 10,500.00
Electricity $ 45,000.00 $ 4,004.22 $ 40,995.78
Gasoline $ 20,000.00 $ 1,605.51 $ 18,394.49
Heating Expenses- Gas $ 16,000.00 $ 143.42 $ 15,856.58
Medical Supplies $ 1,000.00 $ 1,000.00
Office Supplies $ 2,000.00 $ 6.83 $ 1,993.17
Other Equipment Repairs $ 2,000.00 $ 2,000.00
Program Expenses $ 37,000.00 $ 4,787.09 $ 32,212.91
Radio Repairs $ 2,000.00 $ 2,000.00
Safety & Security $ 1,500.00 $ 1,500.00
Small Tools $ 4,500.00 $ 4,500.00
Telephone $ 10,000.00 $ 1,052.41 $ 8,947.59
Training & Travel $ 10,000.00 $ 200.00 $ 9,800.00
Uniforms & Firefighting Gear $ 30,000.00 $ 351.71 $ 29,648.29
Water/ Sewer $ 3,000.00 $ 137.46 $ 2,862.54
Balance as of 08/05/15
Página 166
4:31 PM Robbins Hose Company # 1, Inc.
08/05/15
Accrual Basis Profit & Loss Detail
July 2015
Type Date Num Name
Ordinary Income/Expense
Income
City Quarterly Deposit
Deposit 07/27/2015 241329
Total City Quarterly Deposit
Total Income
Expense
Apparatus Repairs & Maintenance
Check 07/17/2015 1368 Vaughan Fitch Graphics & Design
Check 07/26/2015 1374 Atlantic Emergency Solutions
Check 07/26/2015 1374 Atlantic Emergency Solutions
Total Apparatus Repairs & Maintenance
Command Vehicle
Check 07/27/2015 1376 I.G. Burton
Total Command Vehicle
Electricity
Check 07/19/2015 1371 City of Dover Utility
Check 07/19/2015 1372 City of Dover Utility
Total Electricity
Gasoline
Check 07/19/2015 1373 City of Dover
Check 07/19/2015 1373 City of Dover
Total Gasoline
Heating Expenses- Gas
Check 07/19/2015 1369 Chesapeake Utilities
Total Heating Expenses- Gas
Office Supplies
Check 07/19/2015 1373 City of Dover
Total Office Supplies
Telephone
Check 07/19/2015 1370 Chief Technologies, LLC
Check 07/19/2015 1373 City of Dover
Check 07/19/2015 1373 City of Dover
Total Telephone
Uniforms
Check 07/26/2015 1375 Municipal Emergency Services
Total Uniforms
Page 1 of 6
Página 167
4:31 PM Robbins Hose Company # 1, Inc.
08/05/15
Accrual Basis Profit & Loss Detail
July 2015
Type Date Num Name
Water/Sewer
Check 07/19/2015 1371 City of Dover Utility
Check 07/19/2015 1371 City of Dover Utility
Check 07/19/2015 1372 City of Dover Utility
Total Water/Sewer
Total Expense
Net Ordinary Income
Net Income
Page 2 of 6
Página 168
4:31 PM Robbins Hose Company # 1, Inc.
08/05/15
Accrual Basis Profit & Loss Detail
July 2015
Memo Clr Split
Ordinary Income/Expense
Income
City Quarterly Deposit
1st Quarter Installment- includes Command vehicle City Fund Account
Total City Quarterly Deposit
Total Income
Expense
Apparatus Repairs & Maintenance
Lettering of new Chiefs Vehicle City Fund Account
Invoice-10602DEL- Ladder 2 air brakes City Fund Account
Invoice # 10604DEL- Ladder 2 rear barkes City Fund Account
Total Apparatus Repairs & Maintenance
Command Vehicle
2015 Chev Tahoe City Fund Account
Total Command Vehicle
Electricity
Acct # 44343-32052 City Fund Account
Acct # 44255-31966 City Fund Account
Total Electricity
Gasoline
Unleaded Fuel- June City Fund Account
Bio-Diesel- June City Fund Account
Total Gasoline
Heating Expenses- Gas
Station 1 from 06/02 to 07/02 City Fund Account
Total Heating Expenses- Gas
Office Supplies
June Postage charges City Fund Account
Total Office Supplies
Telephone
Chief Messaging/web hosting until 08/01 City Fund Account
Verzon June charges City Fund Account
Cavalier June charges City Fund Account
Total Telephone
Uniforms
Invoice-00651536_SNV- boots City Fund Account
Total Uniforms
Page 3 of 6
Página 169
4:31 PM Robbins Hose Company # 1, Inc.
08/05/15
Accrual Basis Profit & Loss Detail
July 2015
Memo Clr Split
Water/Sewer
Acct # 44345-32054 City Fund Account
Acct # 44341-32050 City Fund Account
Acct # 44253-31964 City Fund Account
Total Water/Sewer
Total Expense
Net Ordinary Income
Net Income
Page 4 of 6
Página 170
4:31 PM Robbins Hose Company # 1, Inc.
08/05/15
Accrual Basis Profit & Loss Detail
July 2015
Amount Balance
Ordinary Income/Expense
Income
City Quarterly Deposit
120,675.00 120,675.00
Total City Quarterly Deposit 120,675.00 120,675.00
Total Income 120,675.00 120,675.00
Expense
Apparatus Repairs & Maintenance
1,915.00 1,915.00
583.27 2,498.27
6,840.99 9,339.26
Total Apparatus Repairs & Maintenance 9,339.26 9,339.26
Command Vehicle
33,650.00 33,650.00
Total Command Vehicle 33,650.00 33,650.00
Electricity
3,327.70 3,327.70
676.52 4,004.22
Total Electricity 4,004.22 4,004.22
Gasoline
508.20 508.20
1,097.31 1,605.51
Total Gasoline 1,605.51 1,605.51
Heating Expenses- Gas
143.42 143.42
Total Heating Expenses- Gas 143.42 143.42
Office Supplies
6.83 6.83
Total Office Supplies 6.83 6.83
Telephone
342.00 342.00
279.27 621.27
20.94 642.21
Total Telephone 642.21 642.21
Uniforms
351.71 351.71
Total Uniforms 351.71 351.71
Page 5 of 6
Página 171
4:31 PM Robbins Hose Company # 1, Inc.
08/05/15
Accrual Basis Profit & Loss Detail
July 2015
Amount Balance
Water/Sewer
89.50 89.50
14.49 103.99
33.47 137.46
Total Water/Sewer 137.46 137.46
Total Expense 49,880.62 49,880.62
Net Ordinary Income 70,794.38 70,794.38
Net Income 70,794.38 70,794.38
Page 6 of 6
Página 172
ACTION FORM
PROCEEDING: City Council AGENDA ITEM NO.:
DEPARTMENT OF ORIGIN: Public Works DATE SUBMITTED: 8/28/15
PREPARED BY: Sharon Duca, P.E., Public Works Director / City Engineer
SUBJECT: Authorization to Reimburse Kent County Levy Court – Water Main Diameter Increase
REFERENCE: CIP - Water Quality Improvements
RELATED PROJECT: N/A
APPROVALS: City Manager, Controller
EXHIBITS: Exhibit A – Bid Price for Pipe Diameter Change, A-Del Construction Co., Inc. , Exhibit B – Site Map
EXPENDITURE REQUIRED: $30,000 AMOUNT BUDGETED: $1,000,000
FUNDING SOURCE (Dept./Page in CIP & Budget): Department of Public Works- Water Management,
Project Name: Water Quality Improvements Account No.: 417-6800-568.40-31.
TIME TABLE: The reimbursement will occur within thirty (30) days of Council approval.
RECOMMENDED ACTION: Authorize staff to reimburse Kent County Levy Court $30,000 for the increased
diameter water main that is currently being installed to serve the Kent County Recreation Building on New
Burton Road.
BACKGROUND AND ANALYSIS
In the spring of 2014, Kent County Levy Court staff met with the City of Dover to discuss a new project,
entitled the Kent County Recreation Center. The location of this project is on New Burton Road, south of
Webbs Lane, which is not within City of Dover boundaries. In order to provide potable water to the site, Kent
County Levy Court proposed to extend a City owned water main from Webbs Lane south within New Burton
Road to their site, approximately 2,700 linear feet. This main would be within State of Delaware right-of-way
and would ultimately become the City of Dover’s to maintain. The design calculations from the project
engineer showed that an eight-inch (8”) water main would be sufficient to provide proper domestic and fire
water for the project. The City of Dover requested that the water main be increased to a twelve-inch (12”)
diameter; as this would provide the City opportunity for system expansion in the future.
City staff has reviewed the cost differential and believe it to be a fair market value. Based on the information
above, staff recommends reimbursing Kent County Levy Court $30,000 for the increased water main diameter
for the purposes of future expansion.
Página 174
ATTACHMENT A
Authorization to Reimburse Kent County Levy Court
Water Main Diameter Increase
Turner Dr
Rd
n
Garton Ln
rto
Bu
Ne
Ha man Dr
w
New 12" Water Main
Future Site Location
0 250 500 Feet
Legend
Dover Boundary Division Valve Main Size
Date Printed: August 28, 2015
File: m:\gis_data\projects\tech_mxds Dead End
Curb Stop/Meter Pit
\caf_authorization_to_reimburse_kc Reducer
Department: Public Works GIS Service Connection Curb Stop/House
City of Dover, Delaware
Meter Pit Curb Stop
Hydrant Valve Blow Off