COUNCIL COMMITTEE OF THE WHOLE
AGENDA
AUGUST 28, 2018 - 6:00 P.M.
CITY HALL COUNCIL CHAMBERS
15 LOOCKERMAN PLAZA, DOVER, DELAWARE
PUBLIC COMMENTS ARE WELCOMED ON ANY ITEM AND WILL BE PERMITTED AT APPROPRIATE
TIMES. WHEN POSSIBLE, PLEASE NOTIFY THE CITY CLERK (736-7008 OR E-MAIL AT
CITYCLERK@DOVER.DE.US) SHOULD YOU WISH TO BE RECOGNIZED.
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE
AGENDA ADDITIONS/DELETIONS
1. COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM SEMI-ANNUAL REPORT
(COMMITTEE ACTION NOT REQUIRED)
2. PRESENTATION - DOVER PARK MASTER PLAN (WHITMAN, REQUARDT AND ASSOCIATES LLP)
3. ADJOURNMENT OF PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE MEETING
UTILITY COMMITTEE
AGENDA ADDITIONS/DELETIONS
1. ANNEXATION REQUEST - 179 MIFFLIN ROAD, OWNED BY STEVEN E. ANDREW
(STAFF RECOMMENDS PROCEEDING WITH ANNEXATION OF THE SUBJECT PROPERTY)
2. EVALUATION OF BIDS - FY 2018 STREET AND ALLEY PROGRAM
(STAFF RECOMMENDS AWARDING A UNIT PRICE CONTRACT, BASED UPON BID #18-0039PW, FOR THE
FY 2018 STREET AND ALLEY PROGRAM TO GRASSBUSTERS LANDSCAPING, INC. BASED ON THE
PREVAILING WAGE UNIT PRICES FOR EACH WORK ITEM SUBMITTED. THE ESTIMATED VALUE OF THE
CONTRACT IS $1,032,968.00. WORK WILL BE PERFORMED IN STRICT ACCORDANCE TO THE BID
SPECIFICATIONS.)
3. ADJOURNMENT OF UTILITY COMMITTEE MEETING
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
AGENDA ADDITIONS/DELETIONS
1. 2018 FIREFLY MUSIC FESTIVAL DEBRIEFING
(COMMITTEE ACTION NOT REQUIRED)
Página 2
COUNCIL COMMITTEE OF THE WHOLE AGENDA - AUGUST 28, 2018 Page 2
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE (CONTINUED)
2. EVALUATION OF PROPOSALS - AMBULANCE SERVICES CONTRACT
3. PRIORITIZATION OF CITY OF DOVER STATE CAPITAL TRANSPORTATION PROGRAM (CTP) PROJECTS
(STAFF RECOMMENDS APPROVAL OF THE RECOMMENDED PRIORITY RANKING FOR THE COMING YEAR)
4. ADJOURNMENT OF SAFETY ADVISORY AND TRANSPORTATION COMMITTEE MEETING
ADJOURNMENT OF COUNCIL COMMITTEE OF THE WHOLE MEETING
/TM S:\AGENDAS-MINUTES-PACKETS-PRESENTATIONS-ATT&EXH\COMMITTEE-AGENDAS\2018\08-28-2018 CCW AGENDA.WPD
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(E)(2), THIS
AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE
SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING.
Página 3
CDBG Semi-Annual Report
February-July 2018
CDBG Semi-Annual Review
- The City was awarded $270,899 in program funds for fiscal year 2018.
- FY18 Action Plan has been approved by HUD.
- The City is in compliance with the 1.5 timeliness standard for expenditure of funds within the
program year.
CDBG FY17 Projects
Homeownership Assistance Program
Six (6) first-time homebuyers received settlement assistance and purchased affordable housing
in the City.
Dover Interfaith Mission for Housing
CDBG funds were used to provide operations cost for the shelter. During the program year, over 300
men were serviced and provided overnight shelter.
Connections Community Support Program
CDBG funds were used to provide rapid re-housing/rental assistance services for homeless
households within the City. Two (2) families were provided rental assistance and two (2)
families were provided motel vouchers.
Milford Housing Homeowner Rehabilitation/Emergency Home Repair Programs
During the program year, one single family home was fully renovated, and five (5) families
received emergency home repairs.
Habitat for Humanity
Exterior renovations to an existing owner-occupied home in the Restoring Central Dover
Revitalization area is presently under way.
Neighborhood Stabilization Program (NSP)
From 2010-2018, twelve (12) foreclosed properties were purchased, renovated and sold to
qualified homebuyers in the City, and sixteen (16) families received settlement assistance to
purchase affordable housing. Year to date, over 2.2 million in NSP grant funds have been
invested in the City of Dover. This project is completed.
Página 4
Parks, Recreation, and Community Enhancement 8/28/2018
Status of FY-18 Program Funds - Fiscal Year 7/1/18- 6/30/19
2017 Grant Projects Project Details Total Grant Funds Expended Unencumbered Balance
Funds will be utilized for
settlement assistance for
Homeownership Assistance Program $105,000 $105,000
properties purchased in
the City
Funds will be utilized for
rapid re-housing/rental
Connections $5,000 $5,000
assistance for homeless
persons
Funds will be utilized for
Dover Interfaith Mission for Housing utility and maintenance $22,000 $22,000
cost for the shelter.
Funds will be utilized for
Milford Housing Development Corp $39,719 $39,719
emergency home repairs.
Funds will be utilized for
Milford Housing Development Corp rehabbing owner $25,000 $25,000
occupied homes.
Funds will be utilized to
rehab the exterior of
Habitat for Humanity $20,000 $20,000
owner occupied homes in
the RCD area.
Total $216,719 $216,719
FY18 program funds have not been distributed to the City at this time.
Página 5
DOVER PARK
MASTER PLAN
DOVER, KENT COUNTY, DELAWARE
DRAFT - AUGUST 2018
Página 6
ACKNOWLEDGEMENTS
Mayor and City Council
Project Team Members
Donna Mitchell, City Manager
Kirby Hudson, Assistant City Manager
Margie Cyr, Director, Library & Parks and Recreation (Project Chair)
Sharon Duca, Director, Public Works
Robin Eaton, Public Works, Grounds
Kay Sass, Public Affairs Offer, Emergency Management
Carolyn Courtney, Parks and Recreation
Steve Pickering, Parks and Recreation
Sherwanda Rachal-Speaks, Parks and Recreation
Wayne Voshell, Parks and Recreation
Prepared by:
Whitman, Requardt & Associates
1013 Centre Road, Suite 302
Wilmington, DE 19805
Adopted:
Página 7
TABLE OF CONTENTS
ACKNOWLEDGMENTS
PREFACE i
I. EXECUTIVE SUMMARY iv
II. BACKGROUND INFORMATION 1
INTRODUCTION 2
OVERVIEW OF DOVER PARK 2
COMMUNITY PROFILE 2
OTHER AREA PARKS 3
PARKS MAINTENANCE AND OPERATIONS 4
III. PLANNING AND PUBLIC ENGAGEMENT 7
OVERVIEW AND TIMELINE 8
COMMUNITY ENGAGEMENT 9
ENGAGEMENT ACTIVITIES 9
PROJECT PRINCIPLES 13
IV. EXISTING CONDITIONS AND ANALYSIS 15
SITE INVENTORY 16
EXISTING PARK ELEMENTS AND CONDITIONS 16
CURRENT MAINTENANCE AND OPERATIONS 20
OPPORTUNITIES AND CHALLENGES 21
INTRODUCTION 21
ACCESSIBILITY/CIRCULATION 21
ACTIVITY/PROGRAMMING 22
DESIGN/AESTHETICS 23
SAFETY 23
VEGETATION AND ENVIRONMENT 24
MAINTENANCE AND OPERATIONS 26
V. DESIGN DEVELOPMENT 29
PRELIMINARY ALTERNATIVE CONCEPTS 30
DEVELOPMENT PROCESS 30
DOVER PARK ALTERNATIVE CONCEPT PLAN 1 32
DOVER PARK ALTERNATIVE CONCEPT PLAN 2 33
FINDINGS 34
Página 8
VI. DOVER PARK MASTER PLAN 37
FINAL MASTER PLAN CONCEPT PLAN 38
SUMMARY 38
HIGH PRIORITY FACILITIES 38
DOVER PARK FINAL CONCEPT PLAN 39
POTENTIAL ADDITIONS 40
COST ESTIMATE 42
SUSTAINABLE MAINTENANCE RECOMMENDATIONS 43
VII. IMPLEMENTATION 47
GUIDANCE AND RESOURCES 48
APPENDICES 53
APPENDIX A - SURVEY RESULTS
APPENDIX B - PUBLIC MEETING BOARDS COMMENTS
City of Dover Parks & Recreation Dover Park Master Plan
Página 9
PREFACE Park and its facilities in consideration of the
priorities identified through the community-
driven planning process.
BACKGROUND WHY A MASTER PLAN?
A park master plan is an important tool to help the
Dover Park has served the recreational needs City and the community leverage the full benefits
for east side residents and the wider city for the park has to offer, from providing wildlife
nearly 50 years, providing a place to take a walk habitat and first-time experiences in nature for
in the woods, do an aerobics class, attend YMCA young children, to hosting special events and
summer youth programs, have a family picnic, sports leagues. The Master Plan provides an
play ball, and much more. The park facilities and illustrative vision for the park that inspires action
its natural environment have evolved over time, and support, and also a descriptive, phased
much like the surrounding neighborhoods and implementation plan. Both are critical to long-
wider city. term success and sustainability, that is, both are
In 2013, the City’s consideration and subsequent necessary to ensure the park is safe, well-used,
council vote to demolish the indoor recreation attractive, and well-maintained into the future.
center, raised concern for provision of As the overall guide for the design, programming,
recreational resources and other services that capital investment, maintenance and operations
were being provided by Dover Park. Interest grew at the park, the Master Plan supports interagency
for evaluating Dover Park and the City’s wider coordination, budgeting and fiscal responsibility,
system of parks and recreational resources, which transparency, accountability and benchmarking,
resulted in an array of community discussions, and can also be used to generate support from
the citywide Recreation Needs Assessment, outside organizations, including funding and
and a separate East-Side Assessment Report. other partnerships.
These efforts brought forth important questions, The master planning process is a critical element
concerns, and ideas for helping the park for realizing the community’s vision, enabling a
transition to an up-to-date community facility forum for open discussion about concerns and
with infrastructure and operations that match opportunities, vetting all ideas and grounding
the needs and resources of the community and ideas and subsequent plans in the realities of
City. Consequently, the Dover Park Master Plan available resources and other technical elements.
was undertaken. Engaging stakeholders in defining what to include
in the plan and how to achieve the vision also
PROJECT PURPOSE infuses a higher level of community interest
The goal of the Master Plan for Dover Park is and commitment that can last well into plan
to improve park and recreational resources implementation and help sustain a love for parks.
for Dover’s east side, provide users a safe and Dover Park also functions as part of an entire
enjoyable park experience, and ensure that the
park is an asset that contributes to the overall
vitality of the City of Dover.
PARKS, RECREATION, AND OPEN SPACE
Parks, recreation, and open space are not
simply amenities, they are vital components of ARE NOT SIMPLY AMENITIES, THEY ARE
a thriving community. The Master Plan for Dover VITAL COMPONENTS OF A THRIVING
Park will provide the City the tools needed to
incrementally and sustainably develop Dover COMMUNITY.
i PREFACE
Página 10
system of parks and recreation facilities,
providing a range of environments, equipment,
and staffing support for residents and visitors to
engage in recreational activities and experiences
in nature and the outdoors. This individual park
master plan and elements such as budgeting,
maintenance, capital expenditures, and more,
also must be considered in the context of the full
Dover Park system. Doing so can lead to long-
term sustainability and efficiencies for Dover Park
and providing recreational resources for the City
overall, which are interrelated.
City of Dover Parks & Recreation Dover Park Master Plan ii
Página 12
I. EXECUTIVE
SUMMARY
City of Dover Parks & Recreation Dover Park Master Plan iv
Página 13
VISION FOR DOVER PARK positive activity
■ Provide park spaces and equipment that are
safe and perceived as safe (personal safety,
traffic safety, and operational safety)
EXECUTIVE SUMMARY ■ Promote a healthy ecosystem and leverage
environmental services
The goal of the Master Plan for Dover Park is
to improve park and recreational resources ■ Preserve park facilities and investments to
for Dover’s east side, provide users a safe and maintain the benefits over the long-term and
enjoyable park experience, and ensure that the ensure the facilities remain safe, comfortable,
park is an asset that contributes to the overall and attractive
vitality of the City of Dover.
The results from this planning effort are immediate
As a result of previous studies and public and long-term strategies for the enhancement
engagement events, the Dover Park Master Plan and development of Dover Park that addresses
was created. A large portion of this master plan the recreational needs of community members,
process was to involve the community in the particularly residents east of U.S. Route 13.
vision for Dover Park. The public engagement
efforts included the following: This park master plan presents a conceptual
• Project Team Meetings guide. It does not intend to show the specific
design details for any element, and it does not
• Primary Stakeholder Interviews necessarily show locations of minor features such
• Public Kick Off Open House as benches, signs, or other smaller components.
While the public was engaged in development of
• Public Charette this park plan, the process of engaging park users
• Online WikiMap and stakeholders will continue as elements of this
plan move toward implementation. Opportunities
• City Council Presentation will continue to arise for engaging stakeholders
The Dover Park Master Plan is the result of these in guiding the specific physical changes and
planning efforts and is a guide for the City of infrastructure details. These actions will proceed
Dover to use for both short-term and long-term as capital funding becomes available.
improvement and maintenance efforts. The The final master plan from this effort is shown on
Master Plan reflects the integration of project the next page.
principles and follows these goals:
■ Achieve comfortable, safe access and travel
to / through Dover Park for walkers, bicyclists,
and other modes, while balancing the needs
of the various uses of the park
■ Provide for the recreational needs of the
surrounding neighborhoods (primary), while
also supporting broader community/regional
opportunities (secondary)
■ Make beautiful and vibrant public spaces
that create a positive identity and attract
v EXECUTIVE SUMMARY
Página 14
DOVER PARK FINAL CONCEPT
d
R oa
Oak
e
hit Enhance Main
W Entrance
Pond
Enjoyment Area
Thin Understory and
Remove Invasives
Exis
tin
g
Sid
alk
ew Enhance
Access
ne
Existing Parking Point
rn La
and Driveway
Crushed
Aco
Stone
Keep Trail Vegetation Removal
Playground Limited to Along Trail
2 Classroom with
Can-Do Restroom Building
Playground and Sidewalk
or Splash Pad
alt
ph
Existing As
Nature Play
Pavilion il
Area Within Tra
Add Access
Existing Trees
from Acorn
Lane
Nature Bench
Existing
Water Play (Typical)
Pavilion
Stone Trail
Maintain and shed
Skate Relocate Cru
Disc Golf
Tr a
Maintain il Course
Soccer Existing
Add Access Field Water Tower
Point for
Existing Parking
Mapleton Square
and Driveway
and The Laurels
Vegetation
Removal
Thin Understory and Limited to
Evergreen
Remove Invasives Along Trail
Forest Preservation
(Remove
Low Limbs)
l
rai Maintain
eT Community
ton Garden and
dS Enhance
he
us
Cr Buffer
n
alt Nixo
ph
Maintain As
Lane
Existing Softball Field
Trail
Parking
Wi llis p
Resurface
As Basketball
ha Courts
ad lt T
Ro rail
Existing
Portable
Toilets
Resurface
Tennis Courts
Enhance South Entrance
and Add Signage
City of Dover Parks & Recreation Dover Park Master Plan vi
Página 16
II. BACKGROUND
INFORMATION
City of Dover Parks & Recreation Dover Park Master Plan 1
Página 17
INTRODUCTION
OVERVIEW OF DOVER PARK
Dover Park is located in the City of Dover, which
is the county seat of Kent County and the capital
of Delaware. The city is located on the St. Jones
River in the Delaware River coastal plain. Dover
Park is located on the east side of Dover and is
the largest city park facility to the east of U.S.
Route 13 (Figure 1).
Approximately 15 (53%) of the 28.2 total acres
of parkland are wooded. Park facilities include
playgrounds, a softball field, basketball courts,
tennis courts, picnic pavilions, multi-purpose field
and a disc golf course. A few groups use the park
regularly for ball games and occasionally there
are officially programmed activities and special
events in the park.
The park’s main entrance is located at White Figure 1: Dover Park Location in Dover, DE
Oak Road and can be accessed by vehicles,
bicyclists and pedestrians. By the entrance is a
stormwater pond with thick vegetation and an field with lights, two basketball courts, three
existing sidewalk and driveway that lead into the tennis courts that accommodate pickleball,
park. Much of the park has a perimeter chain link portable toilets, and existing parking lot with
fence. In some places the fence has been cut to approximately 64 parking spaces. There is an
provide access from nearby neighborhoods. asphalt path that serves as non-motorized access
at the southernmost end of the park from Willis
The northern section of the park has park facilities Road. DART First State’s bus route 108 stops along
that include: playground equipment, benches, Willis Road, with a stop at the southern entrance
chess tables with chairs, pavilion, picnic tables, to the park.
sidewalks and parking area for approximately
25 cars. This area is the former site of the COMMUNITY PROFILE
indoor recreation center and remaining utility The city has a population of approximately
connections. 37,400 residents, of which nearly 8,000 (21%)
Within the wooded midsection of the park there are under 18 (American Community Survey
is an existing parking lot with 44 parking spaces, 5-year estimates, 2016). Within a one-mile radius
disc golf course, abandoned asphalt pathway, of Dover Park, there are approximately 5,000
and municipal water tower. West of the wooded residents and 2,900 housing units (US Census,
area is the large multi-purpose field and along 2010). Those people living within one mile are
the eastern edge of the northeast quadrant of considered the primary user group for the park.
the park is an open drainage ditch. According to Census data, approximately 15 to
The southern section of the park has a softball 20 percent of the census block group in which
Dover Park is located is under 10 years (see
2 BACKGROUND INFORMATION
Página 18
the park, approximately 12% of households have
no vehicle available, consistent with rates for City
of Dover (ACS 5 year estimates, 2016). Those with
no access to a motor vehicle will need to rely on
close to home recreation opportunities and/or
will need to use public transit. Considerations
of walking and bicycling access to the park is
particularly important because many park users
are too young to drive a vehicle and many park
users also are seeking convenient opportunities.
The land use around Dover Park is primarily
residential development. Apartment complexes
are adjacent to the park on the northeast and
west sides. These apartment complexes are
Manchester Square, Baytree Apartment Homes,
Mapleton Square and The Laurels. Single family
homes are east and south of the park.
Data Source: American
Community Survey 2016, 5 year
(by Block Group) PARK CLASSIFICATION
Dover Park’s land area classifies it as a
Figure 2: Percent of Population Under 10 Years Old Community Park based on classification
standards of the National Recreation and
Parks Association (NRPA). A community park
Figure 2). The data further suggests that the is identified as being between 20 to 40 acres
population in the areas to the north of the park with a focus on meeting community-based
are generally older and have a smaller proportion recreational needs, that may also provide
of the population under 10 years. Parks can amenities that have a regional draw as well
and should provide recreational opportunities as preserving landscape and open space.
for people of all ages, including both active and Additionally, the NRPA recommends that a
passive experiences. Based on the quantitative typical park and recreation agency should
and qualitative analysis, it is likely that Dover Park offer one park for every 2,144 residents, with
has a primary user group that comprises a large 10.1 acres of parkland per 1,000 residents.
proportion of young families.
Approximately 4% of the population under 18
years has a disability, which is in line with the rates OTHER AREA PARKS
in the county and statewide. Of the population Dover Park is the third largest city owned public
as a whole, approximately 13% (4,800 people) park within Dover. The City of Dover manages 27
is living with a disability. The needs of different parks that have a variety of active and passive
user groups, including those with either physical recreation opportunities. Table 1 lists each City
or other disabilities should be considered as owned park and provided facilities.
park areas are developed and redeveloped to
maximize accessibility for all. In some cases these Existing park and recreation facilities east of
considerations may be required, such as in the U.S. Route 13 were inventoried to analyze the
design of pathways and parking. Within 1 mile of needs for residents in the area. Figure 3 depicts
City of Dover Parks & Recreation Dover Park Master Plan 3
Página 19
the public parks, public schools and private
RECREATIONAL development facilities within a mile of Dover Park
were identified, mapped and made available to the
NEEDS ASSESSMENT public at all community engagement events.
The City of Dover’s 2015 Recreation Needs PARKS MAINTENANCE AND
Assessment assessed and prioritized what OPERATIONS
Dover residents identified as their recreational City of Dover Public Works is currently in charge of
needs. The Recreation Needs Assessment managing all City owned parkland in Dover. Public
is intended to guide the City in making Works is also responsible for maintaining local
appropriate investments in their park system roads and stormwater facilities within the City. Park
to ensure that capital investments support maintenance and operations tasks include trash
the identified needs of the community. receptacle and general debris collection, setting up
506 people completed the survey and 42% athletic fields, mowing lawns, and responding to
of respondents indicated that they use Dover resident calls for park maintenance requests.
Park. 239 respondents indicated that they use
the park for walking/jogging, league activities
and playground use. The assessment also
identified the following amenities that should
be evaluated as part of the master planning
process: restrooms, indoor recreation center,
paved loop trail system, fitness stations, skate
park, splash pad and bicycle racks.
National Recreation and Parks Association (NRPA) Park Classification
Classification Size Guidelines
• Recreation and social purpose
Neighborhood Park, • Emphasis on informal active and passive recreation
Mini‐Park / Pocket 1 to 5 acres, typically • Serves area within approximately 1/4 to 1/2 mile radius
Park uninterrupted by major roads or physical barriers (defined as Park
Service Area)
Community Park • Emphasis on meeting recreational needs of surrounding
(The term “Anchor Park” has community; may also have a regional draw
20 to 40 acres
been used to describe this • Often accommodate large groups of people
type of park in Dover) • Often has a landscape and open space preservation purpose
• Consolidated fields/facilities
Regional Athletic
20 to 80 acres • For programmed adult and youth activity
Complex / Facility
• Serves the community and region
• Unique / single‐purpose facility
Special Use Facility ranges in size • Can apply to a range of park types
Examples: nature site, aquatic, historic site, plaza
4 BACKGROUND INFORMATION
Página 20
Table 1: Existing Parks and Facilities in Dover
City of Dover Parks & Recreation Dover Park Master Plan 5
Página 21
Figure 3: Existing Facilities East of US 13
6 BACKGROUND INFORMATION
Página 22
III. PLANNING
AND PUBLIC
ENGAGEMENT
City of Dover Parks & Recreation Dover Park Master Plan 7
Página 23
PROJECT It is important to involve the public and
stakeholders throughout the master planning
OVERVIEW process because they understand the needs,
interests, and concerns of users. Additionally.
the public engagement process allows the
design team to gather ideas from all activities
OVERVIEW AND TIMELINE and transform them into graphical plans that are
This Dover Park Master Plan project was initiated
grounded in reality and feasible.
through the attention and efforts of a variety of
community stakeholders and City staff dating The entire master planning process and
back to 2013 and earlier. Those efforts include documentation lasted five months, beginning in
the City’s Recreation Needs Assessment, East- April 2018. The public was engaged throughout
Side Assessment Report, and City Council/ the planning and design process effort. The
Committee discussion, and other community design team divided the process into four tasks
conversations. These efforts brought forth to be completed in a compressed timeframe. The
important preliminary questions, concerns, and timeline below identifies the four tasks and lists
ideas for helping the park transition to an up-to- the objectives and actions for each. Identifying
date community facility with infrastructure and the who, why, what, where and how through
operations that match the needs and resources existing conditions analysis, public engagement
of the community. This master planning process and master plan development informed the
and engagement approach was structured to design team to create and refine a master plan
build on those previous efforts. for the City to implement at Dover Park.
8 PLANNING AND PUBLIC ENGAGEMENT
Página 24
COMMUNITY the final presentation to city council.
ENGAGEMENT Primary Stakeholder Interviews
Primary stakeholder interviews were completed
during the public engagement process. The
ENGAGEMENT ACTIVITIES project team chose stakeholders that represented
Public engagement events informed participants the City, had specific knowledge about the
about the park, planning process and gathered park’s maintenance and operations, understood
the public’s desires, comments and feedback. The recreational needs, and/or held special interest in
engagement strategies were selected to provide the park. The stakeholders that responded for an
opportunities for everyone to participate, from interview included the following:
the resident who was unaware Dover Park existed • Current and Former City Council
to highly involved community members. Some Representatives
engagement strategies provided quick and easy
access to participate, while others required more • Dover Housing Authority
time and discussion within a group. Engagement • Police and Emergency Services
opportunities were offered on different days and
• Public Works
times to allow for more community members
to participate. The following are descriptions of • Dover Parks and Recreation
each public engagement strategy and include • City of Dover Staff
a summary of how they were conducted and
engaged participants. The public engagement • Capital School District Personnel
efforts included the following: • Kent County Planning
• Project Team Meetings • Kent County Conservancy
• Primary Stakeholder Interviews • YMCA
• Public Kick Off Open House
Key findings were included on the public open
• Public Charette house boards and were used in the development
• Online WikiMap of the master plan.
• City Council Presentation Public Open House
Project Team Meetings A public open house meeting was held at the
Dover Public Library on May 16, 2018 and was
The project team kickoff meeting that was made attended by approximately 40 individuals,
up of the design team and City staff was held most whom were Dover residents. The meeting
at the start of the project to identify key goals, had eight stations with boards that provided
constraints, strategies for public engagement information ranging from the park’s existing
and logistics for the master planning process. conditions, background information, previous
Regularly scheduled weekly phone calls were study findings, neighborhood demographics,
held throughout April and May to discuss project proposed project principles, and what the design
progress and public engagement logistics. team heard so far from stakeholder interviews
Check-ins were scheduled approximately once a and project team meetings. Most of the boards
month for June through August to discuss public were interactive and allowed participants to
engagement feedback, final concept refinement, attach their comments to gain public input and
cost estimate for proposed improvements, build on the vision for the park. A portion of the
master plan report development and logistics for interactive boards represented the following
City of Dover Parks & Recreation Dover Park Master Plan 9
Página 25
proposed project principles:
• Accessibility and Circulation
• Activity and Programming
• Design/Aesthetics
• Safety
• Vegetation and Environment
• Maintenance and Operations
Station at the Public Kickoff Open House with upcoming
events list, exit surveys, and an aerial map of the park The other interactive boards were the Community
Vision Wall with open ended questions that
allowed for community response. Detail board
comments and responses can be found in
Appendix B. After going through these stations,
participants were asked to fill out a short survey.
Fourteen participants filled out a survey. Survey
results have been included in Appendix A.
Design Week – Charrette
The most intensive public engagement effort
Design team member having a discussion with public was a 3-day design charrette that was held at
open house participants Maranatha Church during May 22-23, 2018.
The project team used the charrette process
to advance the stakeholder and public input
from previous public engagement strategies to
generate two concept plan alternatives for Dover
Park.
The first day of the charrette allowed the public to
participate in hands on activities to develop plan
concepts. Upon entering the space, participants
were able to respond to multiple visual
Visual preference survey boards at the first day of Design preference surveys. From there, two groups of 7-9
Week participants that included community members,
stakeholders and a facilitator worked together to
create a potential concept design for the park.
Each group was provided with an aerial map and
programming packet to build their potential park.
The packets included string to make pathways
of varying lengths and materials, athletic field
cutouts, and colored paper with ¼ and ½ acre
circles with a list of community desired programs
that could be provided in those spaces. The
group members used the provided materials and
Participants working together to create a vision for Dover worked together to place park improvements on
Park the park aerial. After discussion and designing was
10 PLANNING AND PUBLIC ENGAGEMENT
Página 26
complete by the group, the facilitator introduced
the city’s short-term budget and did a rough cost
estimate for the site improvements that were
selected for the design. The teams were able to
modify their park plans to fit the city’s short-term
budget. This exercise gave the participants the
idea of a budget and how much the city can afford
and maintain in the short-term and beyond.
Previous public input and the plans created by
the two teams were used by the design team to Participants placing and discussing programmed spaces
advance the concepts during the open design for Dover Park at Day 1 of Design Week
studio. This all-day event was a working studio that
allowed community members and stakeholders
to drop by and ask questions or provide input on
the design. The two concept alternatives were
presented on the following evening to the public.
Partcipants were able to view both concepts, cost
estimates and phasing schedules. A short survey
was made available for input and design team
was on hand to answer any questions.
Online WikiMap City staff members discussing the two concept
alternatives
WikiMap was utilized to collect feedback from
community members for the vision of Dover Park.
The tool allowed participants to access an online
survey and aerial map of Dover Park. The survey
posed similar questions to the survey at the
public open house. Participants were also able to
add comments directly on an aerial map in the
form of strengths, weaknesses and opportunities
within Dover Park. Twenty (20) individuals filled
out the online survey and comments were made
on the aerial map. See Appendix A for full results. Community members discussing the elements in Concept
City Council Presentation 1 at the public meeting
In August 2018, the final concept plan was
presented to the city council for approval.
Reserved for photo of Final Dover Park Master Plan being
presented to city council for approval
City of Dover Parks & Recreation Dover Park Master Plan 11
Página 27
Public Feedback
Below are example public feedback results that
were gathered from Public Kickoff Open House
HOW OFTEN DO YOU VISIT
and online WikiMap survey. Public participation DOVER PARK?
and feedback informed the project team in Daily
Never
the master planning process for programming Weekly 10%
20%
Dover Park. See Appendices for public feedback 5%
compilation.
IS THERE ANYTHING THAT PREVENTS YOU
OR A MEMBER OF YOUR HOUSEHOLD
FROM USING DOVER PARK? Monthly
35% Yearly
YES 30%
32%
NO
68%
Please identify up to 5 types of activities that you would like to be able to do
(or continue to do) in Dover Park:
GARDENING 2
PLAY SOCCER 2
PLAY BASKETBALL 4
OTHER 4
PLAY TENNIS & PICKLEBALL 4
PLAY BASEBALL OR SOFTBALL 5
TAKE AN EXERCISE & HEALTH CLASS 4
PARTICIPATE IN ADULT SPORTS LEAGUES 4
PLAY DISC GOLF 6
PARTICIPATE IN YOUTH PROGRAMMING; CAMPS; SPORTS LEAGUES 9
GIVE MY PET EXERCISE 10
RIDE A BIKE 15
PLAY (ON PLAYGROUND OR OTHER UNSTRUCTURED PLAY) 20
WALK & JOG 20
HAVE A PICNIC OR SOCIAL GATHERING WITH MY FAMILY & FRIENDS 17
PARK MAINTAINED FOR ENVIRONMENTAL VALUES 18
EXPLORE NATURE (E.G. HIKE THROUGH THE WOODS, BIRD WATCH, ETC.) 23
ATTEND SPECIAL EVENTS (E.G. FESTIVAL, ART FAIR, ETC.) 22
0 5 10 15 20 25
12 PLANNING AND PUBLIC ENGAGEMENT
Página 28
PROJECT PRINCIPLES
Analyzing the information gathered from the stakeholder interviews, meetings with city officials, public
engagement strategies, site visits and desktop research, the six proposed project principles were finalized
by the project team to guide the vision and design development for Dover Park. The six principles and
goals are listed in Table 2.
Table 2: Dover Park Project Principles
Project Principle Goal
Achieve comfortable, safe access and travel to / through Dover Park for walkers,
Accessibility and bicyclists, and other modes, while balancing the needs of the various uses of the
Circulation park
Provide for the recreational needs of the surrounding neighborhoods (primary),
Activities and
while also supporting broader community/regional opportunities (secondary)
Programming
Make beautiful and vibrant public spaces that create a positive identity and attract
Design/Aesthetics
positive activity
Provide park spaces and equipment that are safe and perceived as safe (personal
Safety
safety, traffic safety, and operational safety)
Vegetation and
Promote a healthy ecosystem and leverage environmental services
Environment
Maintenance and Preserve park facilities and investments to maintain the benefits over the long‐
Operations term and ensure the facilities remain safe, comfortable, and attractive
City of Dover Parks & Recreation Dover Park Master Plan 13
Página 30
IV. EXISTING
CONDITIONS AND
ANALYSIS
City of Dover Parks & Recreation Dover Park Master Plan 15
Página 31
SITE INVENTORY
EXISTING PARK ELEMENTS AND
CONDITIONS
The design team conducted an inventory of
Dover Park’s elements and their condition in
the spring of 2018. Overall, the park appeared
in good condition. Notably, multiple City staff
were encountered addressing maintenance and
monitoring issues during park visits.
The full range of park elements were evaluated
including the woodlands, play equipment, and
other infrastructure. The detailed list of park
elements and their condition are presented in
Table 3. Photos of existing elements were taken
during the site visit are on pages 33 and 34. Based
on conditions of the park during field visits, most
of the park’s individual elements were in good or
fair condition. Elements in poor condition were:
park entrances; fencing (including vegetative
overgrowth); the cable access barrier that
extends along the tree line roughly midway
through the park (just south of the playground
and its parking area); and benches. The elements
that were labled as poor needed the most
attention by maintenance staff to improve the
view of the park like the entrances and fencing
(vegetation overgrowth and areas cut for access).
Others where unusable or a potential hazards like
the cable access barrier and the benches in the
woods.
16 EXISTING CONDITIONS AND ANALYSIS
Página 32
Table 3: Dover Park Existing Elements and Conditions
Element Condition Description
Utilized by adult softball league, the infield and outfield is currently maintained.
Softball Field Good Field lighting allows the games to be played at night.
Open space that is currently mowed with two soccer nets. Space is used for
Multi‐Purpose Field Good pickup soccer games and passive recreation.
Playground (Ages 2‐5) Good Standard play equpment with slides, ladder, fireman's pole and stairs.
Standard play equpment with slides, monkey bars, ladders, fireman's pole and
Playground (Ages 5‐12) Good stairs. Metal caterpillar climber.
Small grouping of tables with four seats and chess board printed on tables. Wood
Chess Tables Good on seats recently replaced.
Pavilions Good Two wooden pavilions on concrete slab that fit 6 picnic tables each.
Sidewalk in the southern area of the park connects the softball field, tennis
courts, and basketball courts to parking. Sidewalk in the northern section of the
Concrete Sidewalk Good park connect the main entrance, playground, parking and pavilion.
Vehicular access from the main entrance to three parking areas throughout the
Driveway and Parking Lots Good park. There is a northern, central and southern parking lot.
Evergreen Forest Good Dense mature pine forest with little undergrowth
Two vehicular security gates: one at the main entrance and one located before
the wooded parking area that are used to block vehicle access to the park at
Park Vehicular Gates Good night.
Hardwood Forest Fair Dense mature hardwood forest with dense undergrowth vegetation
Two asphalt basketball courts for pickup games. Faded court lines on worn court
Basketball Courts Fair surface and one slanted basketball net.
Three tennis courts with pickleball option. Worn court surface and failing
Tennis Courts Fair perimeter fence.
9 hole course placed centrally within the park. Tee marker signage fading and
diffcult to locate. Overgrowth of vegetation has created difficult playing
Disc Golf Course Fair conditions for many of the holes. Currently no map or signage in park for course.
Eight wooden picnic tables placed in the pavilions. During site visit, some wre
Picnic Tables Fair missing wood slab for seats.
Restrooms Fair Two portable toliets with fence around three sides.
Street lighting fixtures along the driveway and parking areas throughout the
Lighting Fair park.
Two formal entrances: Main north entrance with pedestrian and vehicular
access. Southern entrance pedestrian only. Informal entrances from
Park Entrances Poor neighborhoods to the east and west of the park
Perimeter chain link fence. Many areas are compromised from vandalization for
Fence Poor access or vegetation growth.
Cable Access Barrier Poor Low cable with wooden posts in central section of park.
Metal benches around the playground and broken unusable wood/metal
Benches Poor benches in the woods.
City of Dover Parks & Recreation Dover Park Master Plan 17
Página 33
Figure 5: Dover Park Aerial and Existing Amenities
18 CHAPTER HEADING
Página 34
Existing softball field with field lighting Existing basketball courts with faded court lines and
leaning backboard
Pavilion near the playground with six picnic tables - some Existing tennis courts with worn surfaces
picnic tables missing parts
Disc golf course tee marker with faded signage Existing playground equipment and benches
Disc golf basket within the evergreen forested area Existing pavilion with one picnic table in the forested area
City of Dover Parks & Recreation Dover Park Master Plan 19
Página 35
Among all the parks in the Dover City system,
Dover Park is known and loved by many for its
trees and woodlands. A majority of participants
in the master planning process expressed their
affinity for the natural feel of the park.
Stakeholders also strongly support enhancing
the existing recreational facilities currently in
Dover Park. Additionally, they desire to protect
the environmental assets above infrastructure
Existing chess tables with playground (ages 2-5) and development that would heavily disturb or
bench in foreground. diminish these features. During the design team
site visit and part of the site analysis and inventory
effort, the elements that make up Dover Park were
identified, inspected and an action to implement
as part of the vision for Dover Park was assigned
to each element.
CURRENT MAINTENANCE AND
OPERATIONS
City of Dover Public Works is currently in charge of
Multi-purpose field with evergreen trees in background managing all City owned parkland in Dover. Public
Works is also responsible for maintaining local
roads and stormwater facilities within the City.
Tasks at Dover Park include trash receptacle and
general debris collection, setting up soccer nets,
removing fallen tree limbs, mowing lawns, and
responding to resident calls for park maintenance
requests. Dover Police currently opens and
closes the vehicular access gate and does a drive
through the park. The City doesn’t currently have
an official maintenance plan for Dover Park.
Existing vehicular access within the forested area
Existing sidewalk near main entrance with thick
vegetation that creates poor user visibility
20 EXISTING CONDITIONS AND ANALYSIS
Página 36
OPPORTUNITIES AND ■ Park is closed from sundown to sunrise
except for occasional scheduled events
CHALLENGES ■ Unauthorized ATV use in open lawn areas
■ Safe pedestrian and bicycle connections
INTRODUCTION to the park – lack of crosswalks and/or
Through the park analysis completed by the design sidewalks
team and input from the public engagement
strategies, opportunities and challenges were ■ Users creating breaks in fence and informal
identified for each of the project principles. The pathways along the perimeter fence
following is a list of each project principle with
a description of all identified opportunities and ■ Site evaluation and improvements are
challenges. limited to the park property boundary and
access to the park from surrounding area is
ACCESSIBILITY/CIRCULATION not part of this project
The goal of this project principle is to achieve
comfortable, safe access to/through the park Figure 6 depicting the existing accessibility and
for walkers, bicyclists, and other modes, while circulation in the park was created from the site
balancing the needs of various users of the park. visit finding and stakeholder interviews. It was
presented on one of the presentation boards
OPPORTUNITIES for the public open house and was on display
■ Improve access to the park from throughout the design week charrette.
neighborhoods to the east
■ Improve pedestrian circulation - create
pathways that connect through the park
■ Improve the access from Manchester
Square
■ Improve park entrances and signage -
increase visibility of access points to the
park and make more inviting
Pathway and gate that allow access to park from
■ Maintain vegetation to improve the Manchester Square
accessibility and circulation of park
CHALLENGES
■ Perception of fence – some perceive the
fence as limiting access into the park
and others perceive the fence as keeping
undesirable activity contained and supports
law enforcement
■ Different entities own different sections
of the perimeter fence and maintenance Secondary vehicle access gate within the park
practices vary
City of Dover Parks & Recreation Dover Park Master Plan 21
Página 37
Figure 6: Existing Access and Circulation Overview
ACTIVITY/PROGRAMMING OPPORTUNITIES
The goal of this project principle is to provide ■ Dover Park is a 28.2 acre park and is an
for the recreational needs of the surrounding important recreation resources for the
neighborhood (primary), while also supporting residents east of US13, particularly kids and
broader community and regional opportunities youth
(secondary).
■ Multi-purpose field is currently used for
pickup soccer games - the large, open area
22 EXISTING CONDITIONS AND ANALYSIS
Página 38
could be utilized for additional programs like new users and retain positive users
concerts, pop-up play activities, and other
small events CHALLENGES
■ Strong support for bringing back physical ■ Current negative perception of the park
staff presence and programs ■ Program and maintenance commitments by
■ Utilize environmental features to promote the City
educational programming and exploration/
enjoyment of nature ■ Deterring negative activity within the park
■ Desire to preserve and enhance existing
recreational facilities SAFETY
The goal of this project principle is to provide
■ Use capital improvements to fund highly park spaces and equipment that are safe and
desirable, affordable and maintainable perceived as safe (personal safety, traffic safety,
facilities and programs to the park
and operational safety).
■ Park provides areas for passive and active
recreation OPPORTUNITIES
■ Vegetation and undergrowth can be managed
■ Existing utility infrastructure can be utilized to improve visibility
to implement new facilities like a restroom
or water play area ■ Create and enhance exsiting spaces that are
ADA accessible
■ Building on existing collaborations within
City departments (i.e. Tuesdays in the Park) ■ Implement programs and facilities into park
and local organizations to provide children to bring more eyes on the park
and adult programs
■ Police Department funded security cameras
CHALLENGES can be installed and monitored by Dover
Police
■ Funding for desired recreational facilities
and providing proper maintenance ■ Lighting could be upgraded under City’s
effort to upgrade street lighting in Dover
■ Low utilization of park due to public
perception of safety and lack of programming CHALLENGES
park is currently underutilized
■ Majority of the park is densely wooded with
■ Current park hours and lighting does not thick undergrowth making poor user visibility
allow for daily extended hour use throughout
■ Monitoring the park consistently by City staff
DESIGN/AESTHETICS for negative activity
The goal of this project principle is to make a
beautiful and vibrant public space that creates a
positive identity and attracts positive activity.
OPPORTUNITIES
■ Create a space that compliments the
natural environment features of the park
■ Capital improvement funding has been
allocated to make improvements to the park
■ Enhance current park elements to attract
City of Dover Parks & Recreation Dover Park Master Plan 23
Página 39
VEGETATION AND
ENVIRONMENT
The goal of this project principle is to promote a
healthy ecosystem, provide exposure to nature,
and leverage environmental services.
OPPORTUNITIES
■ Forested area is unique, unlike other parks
or places in Dover
Mature hardwood trees and understory vegetation
■ Engage community members in some
around the existing abandoned asphalt driveway
vegetation maintenance activities
■ Park can be utilized by nearby youth to
explore nature
■ Utilize environmental features to promote
educational programming and exploration/
enjoyment of nature
■ Strong desire by community to preserve
environmental features
■ Visitors enjoy using disc golf course within
Unique mature evergreen forest area in the park
the forested area
■ Space for wildlife enhancements (bird
feeders, pollinator gardens, etc.)
CHALLENGES
■ Controlling undergrowth of forest to
improve site visibility and use of park
■ Invasive plants growing on perimeter fence
■ Current park hours and lighting does not
allow for daily extended hour use
Stormwater management pond with thick vegetation at
■ Safety concern in densely wooded areas entrance of the park
■ Identifying and removing dead and
hazardous trees
■ Clearing of fallen limbs in evergreen forest
area after large storms
Figure 7 was created from the site visit findings
and desktop research. It was presented on one
of the presentation boards for the public open
house and was on display throughout the design
week charrette. Ditch that connects to the Tributary to Little River
24 EXISTING CONDITIONS AND ANALYSIS
Página 40
Figure 7: Existing Vegetation and Environmental Conditions
City of Dover Parks & Recreation Dover Park Master Plan 25
Página 41
MAINTENANCE AND
OPERATIONS
The goal of this project principle is to preserve
park facilities and investments to maintain the
benefits over long-term and ensure the facilities
remain safe, comfortable and attractive.
OPPORTUNITIES
■ Desire to implement a vegetative
management plan Evergreen forest blocks views of different sections of park
■ Improve park signage and entrances
■ Funding is provided by Dover Police to
install security cameras
■ Utilize local schools, churches, organizations
for community based volunteer groups for
some of the vegetation management and
clean up activities
CHALLENGES
■ Budget and lack of current maintenance Multi-purpose field is periodically mowed
schedule
■ Creating and maintaining visibility
throughout the park
■ Vandalism and graffiti
■ Long held ideas and/or one negative
experience may be creating negative
perceptions
■ Concerted law enforcement efforts are
critical to sustainable/effective operations Adequate trash receptacles that are periodically emptied
can be found throughout the park
■ Different entities own different sections
of the perimeter fence and maintenance
practices vary
Figure 8 was created from the site visit findings
and stakeholder interviews. It was presented on
one of the presentation boards for the public
open house and was on display throughout the
design week charrette.
Fallen limbs in the evergreen forest after a winter storm
26 EXISTING CONDITIONS AND ANALYSIS
Página 42
Vehicle Access Gate
(Closed Dusk to Dawn
by Police)
Vegetation
Pond growing on fence/
blocking sight lines
Mowed Grass
Ditch
Mowed Grass Water
Mature Tower
Hardwood
Forest - thick
undergrowth and
Mature invasive plants
Evergreen Forest -
storm damage
Vegetation creates
growing on fence/ maintenance
blocking sight lines issues
Mowed Grass
Maintained
Softball Field
Police patrol park -
area of usual illegal Vegetation
activity growing on fence/
blocking sight lines
- Limited Visibility
Figure 8: Existing Maintenance and Operations Overview
City of Dover Parks & Recreation Dover Park Master Plan 27
Página 44
V. DESIGN
DEVELOPMENT
City of Dover Parks & Recreation Dover Park Master Plan 29
Página 45
PRELIMINARY presented to the stakeholders and community
members who attended the last day of the
ALTERNATIVE CONCEPTS charrette. Both concepts displayed the following
imperative elements:
■ Improve park security by adding measures
DEVELOPMENT PROCESS that increase sight distances and monitor
Dover Park conceptual plans were derived from activity in park.
community and stakeholder outreach efforts
that included project team meetings, one public ■ Create better access and circulation through
open house, primary stakeholder interviews, and park by installing paths, enhancing existing
a 3-day public charrette. In addition to in person entrances and add additional entrances.
meetings, for the duration of the outreach
efforts a WikiMap was made available online ■ Manage vegetation to provide safe use of all
for members of the community to provide their existing and proposed amenities.
vision for the park. The public input revealed
that there was interest in preserving but also ■ Provide a staff presence through onsite
managing the forested and vegetated areas for facility and/or programs.
safe use of the park, retaining and enhancing the
existing recreation amenities, adding additional ■ Maintain all existing athletic amenities,
infrastructure and providing clear access to the support facilities, and play equipment.
park from surrounding neighborhoods.
■ Include lighting (This item not shown on
Two alternative concept plans, cost estimates, plan - to be included under the citywide
and proposed phasing for each design were effort to upgrade street light fixtures).
Who? Why? What?
Identify
Identify Describe
Stakeholder Park and range of
target Interests motivations
Analysis
user for use
Rec Needs
activities /
programs
Systems -comfort
-circulation
Where? How? -natural / ecology
-etc.
• Activity Aesthetics /
Landscape
areas Park Patterns
• Delineate
spaces
Plan Operations /
Implementation
30 DESIGN DEVELOPMENT
Página 46
ALTERNATIVE CONCEPT 1 ALTERNATIVE CONCEPT 2
Element Description Element Description
Phase 1 (0‐5 years) Phase 1 (0‐5 years)
An ADA compliant linear trail system that connects the
An ADA compliant loop trail system that connects to all Multi‐Use Asphalt official north and south park entrances. Minimum 8' wide
Multi‐Use Asphalt official and proposed park access points for this phase.
Linear Trail trail with 2' clearance on both sides.
Loop Trail Minimum 8' wide trail with 2' clearance on both sides.
Crushed Crushed stone/gravel trails from Acorn Lane, Mapleton
Brushed concrete pad with 8‐10 water features to
accomodate 20‐30 kids. Consider an activation button to Stone/Gravel Trails Square, and Manchester Square
turn on water with a flow‐through or repurpose system Play space with log balance beams, boulders, building
because it requires low maintenance and operating costs Nature Play Area blocks and willow branch arches within the woods near
conpared to a recirculating system that requries water (1/2+ acre) the existing pavilion.
Splash Pad treatment and testing regularly. Building with 1‐2 New modular building with either 2 small open space
Classrooms and concept classrooms or one larger classroom with divider.
ADA compliant asphalt parking lot with ten parking spacing
Acorn Lane Access adjacent to a proposed asphalt pathway that connects to
Restroom ADA compliant access and restroom.
and Parking the proposed loop multi‐use trail system. Park signage. Thinning of undergrowth and clearing of invasive
vegetation near the existing entrances, all proposed
Thinning of undergrowth and clearing of invasive Vegetation entrances, along proposed trail system and through the
vegetation near the existing entrances, all proposed Management middle of the park to improve user visibility.
Vegetation entrances, along proposed loop trail system and through
Management the middle of the park to improve user visibility. Trim and removal of vegetation around entrances and on
fencing to improve visibilty to park. Replace main entrance
Trim and removal of vegetation around entrances and on Entrance sign. Add smaller park signs to southern entrance, Acorn
fencing to improve visibilty to park. Replace main entrance Enhancements Lane, and access point from Manchester Square.
Existing Entrances sign. Add smaller park signs to southern entrance and Remove overgrown vegetation within the fairways, repair
Enhancement access point from Manchester Square. or replace any broken disc baskets or tee boxes. Consider
Park has one staff member at the park for programs one Fix and Maintain replacing tee signage and placing a disc golf course map at
Park Staff day a week. Disc Golf Course the park.
At least three security cameras funded, placed and Resurface Tennis
Security Camera monitored by Dover Police Department.
Courts and Resurface and repaint existing tennis courts and
Phase 2 (5‐10+ years)
If feasible, remove a portion of the vegetation in between Basketball Courts basketball courts. Repair or replace broken nets, if any.
the sidewalk and pond within the park to allow user Educational tools to allow for wildlife observing for users
observation into the pond. Possible added elements could
Wildlife/Habitat (birdhouses, bat boxes, turtle basking platforms, pollinator
be benches, picnic tables or a wooden platform adjacent to Enhancements gardens, etc.
pond. Identify wildlife in the pond, and consider adding Park has one staff member at the park for programs one
habitat enhancements (turtle basking platforms) for Park Staff day a week.
Pond Enhancement educational activities. At least three security cameras funded, placed and
Paved trail with skateboard/wheel sport obstacles like Security Camera monitored by Dover Police Department.
Linear Skate grind ledges, flat rails, manual pads, pump bumps, Phase 2 (5‐10+ years)
Obstacle Trail funboxes and/or rainbow rails. Paved trail with skateboard/wheel sport obstacles like
Pavilion and play space with natural materials like log Linear Skate grind ledges, flat rails, manual pads, pump bumps,
Nature Play Area balance beams, boulders, building blocks and willow Obstacle Trail funboxes and/or rainbow rails.
(1/4 acre) with branch arches within the woods near the proposed Acorn
Pavilion Lane entrance.
Playground that is designed to be accessible to every child
Approximately one acre dog park in wooded area. Section Can‐Do Playground regardless of physical, mental and sensory abilities.
of woods to be cleared of undergrowth and invasives. If Up to 1 acre fenced in community garden with crushed
desired by community, consider perimeter fence with
stone/gravel trail from asphalt trail to gate. Consider
sections for big and small dogs as well as a pet waste
adding fruit trees outside of fenced in area to create a
Dog Park station.
buffer between softball field/basketball courts and Nixon
Remove overgrown vegetation within the fairways, repair
Community Garden Lane residents.
or replace any broken disc baskets or tee boxes. Consider
Fix and Maintain replacing tee signage and placing a disc golf course map at Install at least 10 benches throughout the park along the
Disc Golf Course the park. Benches new trail system and near new park elements.
Resurface Tennis Four fitness stations spread out in the central area of the
Courts and Resurface and repaint existing tennis courts and basketball Fitness Stations park with outdoor stationary fitness equipment.
Basketball Courts courts. Repair or replace broken nets, if any.
Crushed Stone Secondary crushed stone/gravel trail through the
Connector Trail hardwood forest near the dog park.
Install at least 10 benches throughout the park along the
Benches new trail system and near new park elements.
Add an ADA compliant asphalt trail from the proposed
Additional Multi‐Use Mapleton Square entrance to the Phase 1 asphalt loop
Asphalt Trail trail. Extend the loop trail through the southern section of
Connections the park.
Educational tools to allow for wildlife observing for users
Wildlife/Habitat (birdhouses, bat boxes, turtle basking platforms, pollinator
Enhancements gardens, etc.
City of Dover Parks & Recreation Dover Park Master Plan 31
Página 47
DOVER PARK CONCEPT 1
oad
kR
Oa
e
hit Enhance Main
W Entrance
Pond
Enhancement/
Enjoyment Area
(Phase 2) Thin Understory and
Remove Invasives
Exis
tin
g
Sid
As
Trail
alk
alt
ew Enhance
ph
Access
ne
Existing Parking Point
rn La
Minimal Vegetation
and Driveway Removal
Aco
(Enhance for Wildlife)
Keep
Playground Bench (Typical) Asphalt
(All Phase 2) Trail
Splash
Pad
Existing
Pavilion
alt
ph
As
il Add Access
Tra from Acorn
Lane
Asphalt New Pavilion
Trail Existing
Maintain Pavilion (Phase 2)
(Phase 2) Small Nature
Disc Golf
l
Skate Tr a i
Course Play Area Parking Lot
(Phase 2) (Phase 2) (10 Spaces)
(Phase 2 ) As p Thin Understory and
Maintain
Soccer rail Remove Invasives
lt T
Add Access Field ha Existing
Point for Water Tower
Mapleton Square
and The Laurels Existing Parking
and Driveway
Crushed Wooded
Keep Evergreen Dog Park
Stone Trail
Forest
Remove
(Phase 2)
Low Limbs
Maintain
halt Trail and
Asp
Enhance
Buffer
Asphalt
n
Nixo
Trail
(Phase 2)
Existing Maintain
Lane
Parking Softball Field
Wi llis p
Resurface
Basketball
As
ha Courts
ad lt T (Phase 2)
Ro rail
Resurface
Tennis Courts
(Phase 2)
Enhance South Entrance
and Add Signage
Figure 9: Dover Park Alternative Concept Plan 1
32 DESIGN DEVELOPMENT
Página 48
DOVER PARK CONCEPT 2
d
oa
kR
Oa
e
hit Enhance Main
W Entrance
Thin Understory and
Remove Invasives
Exi
sti
As ng
T Sid
alt
ph
alk
rail ew Enhance
Linear Access
Existing
Skate
ne
Sidewalk Existing Parking Point Minimal Vegetation
rn La
Obstacles Removal
and Driveway
(Phase 2) (Enhance for Wildlife)
Aco
Keep
Playground Proposed
shed Sto
2 Classroom and Cru ne
Can-Do Restroom Fitness
Playground Facility Station il
Tra
(Phase 2) (Phase 2)
Existing il Bench (Typical)
Pavilion Tra (All Phase 2)
ne
to Large Add Pedestrian
Nature Play
S
ed Access to
sh Area Cr Acorn Lane
Fitness C ru u
Existing she
Station dS
Nature Pavilion tone
(Phase 2) Trail il
Water Play ne Tra
d Sto
Fitness C rushe
Existing Parking Station
h
Asp and (Phase 2)
Maintain al Driveway
Soccer ra il
Field tT
Existing
Fitness Water Tower
Maintain
Station
Disc Golf
(Phase 2)
Course
Thin Understory and
Remove Invasives
Minimal Vegetation
Add Access Keep Evergreen Removal
Point for Forest (Enhance for Wildlife)
Mapleton Remove
Square Low Limbs
Crushed
Stone Trail Community
Garden
(Phase 2)
n
p Nixo
As
Maintain
Lane
ha
lt T Softball Field
ra
llis
il
Wi Existing
Resurface
Basketball
Parking
ad
Courts
Ro
Resurface
Tennis
Courts
Enhance South Entrance
and Add Signage
Figure 10: Dover Park Alternative Concept Plan 2
City of Dover Parks & Recreation Dover Park Master Plan 33
Página 49
The city’s available funding for short-term (Phase
I: 0-5 years) capital improvements within Dover
Park is $640,000. No funding has been allocated
during the master planning process for long-term
(Phase II: 5+ years) improvements. Estimates Alternative Concept 1
include approximate costs for all elements listed Phase 1 (0‐5 years) $540,000
in Phase I and Phase II, maintenance of existing
facilities at current maintenance level, and Phase 2 (5+ years) $330,000
maintenance of improvements added for Phase I Full Build $970,000
and Phase 2. Totals for each phase and full build
for each concept are illustrated on this page. Alternative Concept 2
Both concept alternatives were presented to the Phase 1 (0‐5 years) $640,000
public and attendees had the opportunity to fill Phase 2 (5+ years) $305,000
out a survey that asked the individual to prioritize
each of the project principles by individual Full Build $945,000
importance and how each represented their
vision in Concept 1 and 2. Each principle for the
two concepts could be rated by either very well,
somewhat and not well.
FINDINGS
Alternative Concepts Findings
Project Principle Public Feedback Analysis
This project principle had the highest amount of individual votes for very important. Public
voiced strong favor for a loop system trails over the linear main trail with connections to
access points but had concern for the amount of clearing necessary for trails within
Accessibility and forested areas. Most liked the proposed access points and ehancements for existing
Circulation entrances.
This project principle had a mix of responses. For example some liked splash pad while
others did not. Majority of respondents did not comment or favor the dog park and its
location because it would require some vegetation management. Most people left
Activities and comments if they felt a proposed amenity was impacting forested areas too much. Overall
Programming most of the proposed types of facilities were well received.
There was a strong preference for Concept 2 as the participants' vision for this principle
because it had less trails and development in the woods. Overall participants highly value
Vegetation and preserving the forested area and minimizing development/programming within these
Environment areas.
As expected, this project principle got the least amount of very important responses by
Maintenance and the public but the maintenance and operations of each concept was presented in basic
Operations terms to the public. This principle has a high priority for a successful park.
People felt that Concept 1 was somewhat safer than Concept 2 because of there are
Safety programmed spaces throughout the park and the loop trail system.
Concept 1 had an even response of "very well" or "somewhat" response whereas most
people voted "very well" for Concept 2. Most people that commented on overall design
differences said they felt it was too much clearing of the wooded areas and did not like
Overall dog park.
34 DESIGN DEVELOPMENT
Página 50
How important are the following things to you
as an individual?
30
25
20
15
10
5
0
Activities and Accessibility and Vegetation and Maintenance and Safety
Programming Circulation Environment Operations
(budget)
Not Important Neutral Very Important
How well does Concept 1 represent your
personal vision for the park?
30
25
20
15
10
5
0
Activities and Accessibility Vegetation Maintenance Safety Overall
Programming and and and
Circulation Environment Operations
(budget)
Not Well Somewhat Very Well
How well does Concept 2 represent your personal
vision for the park?
35
30
25
20
15
10
5
0
Activities and Accessibility Vegetation and Maintenance Safety Overall
Programming and Circulation Environment and Operations
(budget)
Not Well Somewhat Very Well
City of Dover Parks & Recreation Dover Park Master Plan 35
Página 52
VI. DOVER PARK
MASTER PLAN
City of Dover Parks & Recreation Dover Park Master Plan 37
Página 53
FINAL MASTER PLAN ■ Park entrance enhancements at all existing
and proposed official access points
CONCEPT PLAN ■ Clearing undergrowth near the main
entrance and through the center of park in
the hardwood forest area. Removing large
SUMMARY specimen trees that are hazardous
A final master plan was completed and presented
to city council for review with a cost estimate ■ Install and monitor 3 security cameras
for proposed short-term improvements (0-5
years) and optional list of improvements the The following elements were selected as potential
city could pick from for either a short-term or additions with some possibly being implemented
long-term project. The total estimated costs and in the short term (0-5 years) but most to be
phasing were based on the city’s available capital accomplished in the long term (6-10+ years) to be
improvement for the next five years. selected at the City’s discretion:
The following elements were selected as high • Splash Pad (accommodates 20-30 kids)
priority short term (0-5 years) components to be • Can-Do Playground
implemented for a successful Dover Park:
• Indoor Classroom(s) with Restroom
■ An asphalt multi-use loop trail system and
pathway connections throughout the park • Linear Skate Obstacle Trail (1,000 SF)
■ Resurfacing of tennis courts and basketball
• Nature Play Area
courts • Community Garden (with fence)
■ Access points and trails from the east side • Park Benches (10+)
of the park at Acorn Lane and Manchester • Pond Enjoyment Area
Square and the west side at Mapleton Square
and The Laurels • Wildlife Enhancements
• Enhance Disc Golf Course
HIGH PRIORITY FACILITIES
Short Term (0‐5 years) Element Sections
Element Description
Public feedback favored a loop trail system but there was concern for the amount of asphalt trails and disturbance within the
wooded areas. For the final concept, an ADA accessible asphalt loop trail was selected with crushed stone/gravel secondary
connection trails. The asphalt trail from the main entrance to the existing playground was eliminated, the main trail in the
evergreen forest was moved along the perimeter to minimize forest impacts, and the alignment within the hardwood forest was
Paved Loop Trail adjusted to use the existing abandoned asphalt area and avoid crossing the ditch. Potential for bicycle racks, fitness stations,
System benches, etc. to be added along trail and at intersections.
Resurface Existing Public feedback encouraged preserving and enhancing existing facilities within the park. Resurface and repaint existing tennis
Courts courts (3) and basketball courts (2). Repaint tennis court lines to include pickleball. Repair or replace broken nets, if any.
Due to the amount of vegetation clearing for a new parking lot and an asphalt trail from Acorn Lane and the park currently having
adequate parking, the parking lot addition was not selected for final design. A pedestrian access point and crushed/stone trail was
selected to provide access from Acorn Lane to minimize environmental impacts. Similar trail treaments were selected for access
Park Entrances and points from Mapleton Square and Manchester Square. Trim and remove of vegetation around entrances and on fencing to improve
Enhancements visibilty to park. Replace main entrance sign. Add smaller park signs for all other entrances.
This action is a top priority for safety and better utilization of the park. Thinning of undergrowth and clearing of invasive vegetation
Vegetation near the existing entrances, all proposed entrances, along proposed trails and through the middle of the park to improve user
Management visibility.
Security Camera At least three security cameras funded, placed and monitored by Dover Police Department.
38 DOVER PARK MASTER PLAN
Página 54
DOVER PARK FINAL CONCEPT
oad
kR
Oa
e
hit Enhance Main
W Entrance
Pond
Enjoyment Area
Thin Understory and
Remove Invasives
Exis
tin
g
Sid
alk
ew Enhance
Access
ne
Existing Parking Point
rn La
and Driveway
Crushed
Aco
Stone
Keep Trail Vegetation Removal
Playground Limited to Along Trail
2 Classroom with
Can-Do Restroom Building
Playground and Sidewalk
or Splash Pad
alt
ph
Existing As
Nature Play
Pavilion il
Area Within Tra
Add Access
Existing Trees
from Acorn
Lane
Nature Bench
Existing
Water Play (Typical)
Pavilion
Stone Trail
Maintain and shed
Skate Relocate Cru
Disc Golf
Tr a
Maintain il Course
Soccer Existing
Add Access Field Water Tower
Point for
Existing Parking
Mapleton Square
and Driveway
and The Laurels
Vegetation
Removal
Thin Understory and Limited to
Evergreen
Remove Invasives Along Trail
Forest Preservation
(Remove
Low Limbs)
l
rai Maintain
eT Community
ton Garden and
dS Enhance
he
us
Cr Buffer
n
alt Nixo
ph
Maintain As
Lane
Existing Softball Field
Trail
Parking
Wi llis As
Resurface
Basketball
alt Courts
Ro ph
Tra
ad il
Existing
Portable
Toilets
Resurface
Tennis Courts
Enhance South Entrance
and Add Signage
Figure 11: Dover Park Final Concept Plan
City of Dover Parks & Recreation Dover Park Master Plan 39
Página 55
POTENTIAL ADDITIONS
The following is the list of potential additions that
were presented to the city officials as elements
that could be implemented in short-term or
long-term projects. These elements were found
to be desirable by the public and stakeholders
but did not rank as high as a trail system,
enhancing existing amenities, improving security
and managing vegetation for safety. A short Source: Blue Lake Regional Park
description and photo of the main elements from Example of nature play area with large boulders, logs and
the selection menu has been provided. stumps
SPLASH PAD
A small brushed concrete pad with 8-10 water
features and activation button to accomodate 20-
30 kids. The master plan suggests this element to
be added to the park if proper funding becomes
available and there is a maintenance commitment
for this facility. Selection of water system type is
extremely important. Can be implemented by
iteself or in conjunction with a Can-Do Playground
or other play equipment. If implemented with Source: Blue Lake Regional Park
Can-Do Playground, consider reduction in splash Example of small splash pad on concrete
pad size and number of water features.
CAN-DO PLAYGROUND
Playground that is designed to be accessible
to every child regardless of physical, mental or
sensory abilities. The master plan suggests this
element be located in the northern section of the
park near the existing pavilion. Build on existing
sidewalk infrastructure to make the path from
parking area to playground ADA accessible. Add
benches and shaded spaces to perimeter of play Source: Can-Do Playground facebook
area. The facility should be placed near existing Can-Do Playground in Wilmington, DE
playground equipment.
MODULAR BUILDING
Proposed modular building that is programmed
to have either two small classrooms or one large
classroom with divider. Either setup would have
ADA accessible restrooms and access to the
building from parking area and asphalt loop trail
system. This facility should only be implemented
and is highly dependent on frequent community
programs that require indoor classrooms or all Source: Modular Genius
day summer programs for kids in Dover Park Example of modular classroom with restroom facility
provided by Parks and Recreation.
40 DOVER PARK MASTER PLAN
Página 56
NATURE PLAY AREA
Play space within the wooded area near the
existing pavilion that has natural materials like
log balance beams, climbing boulders, building
blocks, and a water play area. The water play area
could be a small water pump that allows kids
to pump water into a small area that mimics a
stream bed or a water table. The facility should
be designed to minimize impacts to the existing
mature trees within the play space.
Source: Unknown
Example of nature play area with a small hand water
pump as the water play feature
LINEAR SKATE OBSTACLE TRAIL
Paved trail with skateboard/wheel sport obstacles
like grind ledges, flat rails, manual pads, pump
bumps, funboxes and/or rainbow rails. Trail should
be designed to have adequate space to ride in
and out of each obstacle. Spaces for resting and
observation should be placed within view of the
trail. Create a connection from the asphalt trail to
this facility. This facility should be located in an
open area like the edge of the multi-purpose field
to minimize impacts to woods. Source: Omokoroa Skate Path
Example of linear skate trail with obstacles
COMMUNITY GARDEN
Up to 1 acre fenced in community garden with
crushed stone/gravel trail from asphalt loop trail
to gate. This space allows community members to
participate in gardening with each other. Primarily
planted with fruits and vegetables, it provides a
food source to the local community. This facility
should be used if there is nearby community
interest for a community gardening group and is
facilitated by Parks and Recreation or established
organization. Source: Wilsonville Parks and Recreation
Example of Community Garden with fence
POND ENJOYMENT AREA
Removal of an area of vegetation in between
the pond and existing sidewalk to create a space
for users to passively enjoy the pond. Possible
elements in this space is a viewing platform with
railing and benches or picnic tables in the grass
area. Opportunities for educational outreach and
adding wildlife enhancements.
ADDITIONAL FACILITIES
Benches, wildlife enhancements and enhancing Source: Camp Rosenthal
the existing disc golf course are other facilities Example of a view platform with railing and bench
that are listed on the additional options menu. adjacent to a pond
City of Dover Parks & Recreation Dover Park Master Plan 41
Página 57
COST ESTIMATE
The cost estimate is divided into two sections with the first section listing the approximate total cost for
Phase I (0-5 years) improvements and the second section is a list of potential additional improvements
that the city could choose implement one or a few of the elements in Phase I and/or decide which to
implement in later phases. Anticipated funding for Phase I has been included in this table for reference.
During this planning effort, no funding has been allocated beyond Phase I.
FINAL PREFERRED CONCEPT ‐ DOVER PARK CAPITAL IMPROVEMENT LIST
Phase 1 (0‐5 yrs.)
Phase Quantity Improvement Approximate Unit Cost Total Cost
Pathways, Trails, and Circulation
1 0.75 Miles Asphalt Paved Trail $45,000 per 1/4 mile $135,000
1 0.25 Miles Gravel/crushed stone trail (8' wide) $15,000 per 1/4 mile $30,000
1 5 Park Entrance Enhancements $7,000 each $35,000
sub‐total $200,000
Athletic Facilities
1 3 Resurface Tennis Courts $10,000 each $30,000
1 2 Resurface Basketball Courts $10,000 each $20,000
sub‐total $50,000
Vegetation Management
1 6 Clearing Undergrowth $8,000 per acre $60,000
1 5 Remove Large Specimen Trees $3,000 each $15,000
sub‐total $75,000
Park Security
1 3 Security Cameras $7,500 camera + $7,500 pole $45,000
sub‐total $45,000
Total Improvements $370,000
Estimated Engineering costs (15%) $60,000
5 year maintenance costs (includes current costs) $70,000
Approximate Phase I Cost $500,000
Menu of Potential Additional Improvements
Splash Pad (accommodates 20‐30 Kids) $250,000
Can‐Do Playground $195,000
Indoor Classroom with Restrooms $165,000
Linear Skate Obstacles (1000 SF) $65,000
Nature Play Area $40,000
Community Garden (with fence) $35,000
Park benches (10) $20,000
Pond Enhancement/Enjoyment Area $20,000
Wildlife enhancements (i.e. birdhouses, bat boxes, view scopes) $6,000
Fix and Maintain Frisbee Golf Course $6,000
Anticipated Available Funding Phase 1
FY 2018‐2019 $140,000
FY 2019‐2020 $125,000
FY 2020‐2021 $125,000
FY 2021‐2022 $125,000
FY 2022‐2023 $125,000
total $640,000
42 DOVER PARK MASTER PLAN
Página 58
SUSTAINABLE
MAINTENANCE
RECOMMENDATIONS
In order for the park to function successfully for the community, a sustainable maintenance protocol must
be created and followed by the City. The first table provided in this section are an example maintenance
and monitoring schedule that can be built upon and implemented to address the maintenance concerns
for existing vegetation management and proposed elements for Dover Park. The table also includes
which efforts have the potential to involve volunteers from the community. The second table provides
a list of the existing elements within Dover Park and assigns an action for each.
Maintenance/Monitoring Schedule
Volunteer
JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC YEAR NOTES Opportuntity
INITIAL LARGE EFFORT VEGETATION ACTIVITIES
Large effort YEAR 1‐2; Focus efforts YEAR 1 on
entrances and fencing that is being damaged by
weight of vegetation. Ongoing upkeep and
Vegetation Removal ‐ Fence X X X 1‐2 repair fence as needed. YES
Large effort YEAR 1; Remove undergrowth along
existing sidewalk (25' on each side) and prune
Vegetation Removal ‐ Main tree limbs lower than 7'. Selectively prune
Entrance Zone X X X 1 evergreens in late winter. YES
Large effort YEAR 1‐2; Ongoing upkeep. Clear
undesirable undergrowth within 10' from edge
of parking/driveway pavement. Preserve hollies
and desirable plants. Prune in late winter as
Vegetation Removal ‐ needed. Remove undergrowth near pavilion
Central Parking Zone X X X X 1‐2 (100' radius) and prune tree limbs lower than 7'. YES
Large effort YEAR 3‐4; Ongoing upkeep.
Selectively clear undergrowth and remove
Vegetation Removal ‐ invasives. Preserve hollies and desirable plants.
Southern Hardwood Zone X X X X 3‐4 Prune trees in late winter as needed. YES
Inspect for dead or hazardous trees play areas
and existing paths and parking in YEAR 1.
Remove as needed. Increase efforts as new
Specimen Tree Inspection X X 1‐5 improvements are added to park. NO
Spot spray foliar spray glyphosate on aggressive
plants on fencing and identified problematic
Exotic/Invasive Plant areas in park. Do not spray near play areas. To
Control Spray X X 1‐5 be applied by trained professional. NO
ONGOING VEGETATION MAINTENANCE
Trim and remove any vegetation encroaching on
path/sightlines ‐ maintain 2' clear on either side
Vegetation Along Pathways X X X ALL of asphalt trail YES
Undergrowth and Sightline Maintain vegetation to initial large effort
Maintenance X X X X ALL standards YES
Evergreen Forest Cleanup X X ALL Remove fallen large limbs in evergreen forest YES
Leaf and Debris Cleanup X X ALL Remove from desired areas. Compost leaves. YES
Inspect for dead or hazardous trees near park
Specimen Tree Inspection X X ALL amenities. Remove as needed. NO
Mowing Lawn X X X X X X ALL Keep to current standard. NO
PROPOSED SHORT‐TERM IMPROVEMENTS
Trail System X X ALL Inspect asphalt and crushed stone trails NO
Park Signage X X ALL Inspect for stability and any vandalism NO
Inspect for wear and tear. Remove vegetation
Tennis Courts X X ALL from fencing. Repair net if needed. NO
Basketball Courts X X ALL Inspect for wear and tear. Repair if needed NO
Inspect pole stability in spring and fall. Verify
with police that cameras are operational four
Security Cameras X X X X ALL times a year. NO
City of Dover Parks & Recreation Dover Park Master Plan 43
Página 59
Dover Park Existing Facilities Maintenance
Element Action
Maintain field to current standards. Monitor field lighting to ensure proper function. Inspect
Softball Field dugout benches and grandstand yearly.
Maintain mowing schedule and periodically inspect soccer nets. Repair nets as need. Store when
Multi‐Purpose Field field not in use.
Monitor area by a walkthrough when emptying trash receptacles during the year. Inspect play
Playground (Ages 2‐5) equipment yearly in spring. Consider replacement of play equipment and play surface in long term
Playground (Ages 5‐12) goals.
Chess Tables Inspect yearly and repair as needed.
Inspect yearly and repair as needed. Clear undergrowth around pavilion in woods to improve user
Pavilions sight lines.
Maintain to current standards. Consider pedestrian connection through the park as part of short
Concrete Sidewalk term goal.
Driveway and Parking Lots Maintain to current standards.
Remove lower limbs that block user sight lines. Clear large fallen branches. Monitor tree health and
Evergreen Forest remove any hazards.
Maintain to current standards. Revisit use of gates if park receives adequate lighting, programming
Park Vehicular Gates and surveillance.
Thin and clear undergrowth to improve views throughout park. Remove lower limbs that impede
on user sight lines. Clear fallen branches on pathways. Monitor tree health and remove any
Hardwood Forest hazards.
As part of short term goals, resurface court and paint court lines. Inspect backboards and nets
Basketball Courts monthly and replace as needed.
Resurfacing courts and include court lines for pickleball. Remove vines and vegetation from
perimeter fence. Repair fence as needed. Inspect nets monthly and repair as needed. Remove and
Tennis Courts store nets in winter.
Inspect disc golf baskets and replace as needed. Replace current tee marker with highly visible
marker and signage. Clear undergrowth vegetation in fairway. Consider moving holes that conflict
with new amenities. Create updated course map and post within park. Maintain fairways for play
Disc Golf Course and inspect baskets each spring. Repair or replace as needed.
Repair picnic tables to provide seating. Consider maintaining at least three picnic tables in the
wooded pavilion. Inspect yearly and repair. Replace as needed with metal picnic tables to reduce
Picnic Tables burning of tables.
Maintain to current standard. Consider upgrading facility if day programs will be offered at the
Restrooms park for children.
Lighting was not observed by design team during evening hours. Public feedback noted that some
lights were burned out. Consider upgrading lighting fixtures as part of Dover's plan to upgrade all
Lighting downtown lighting.
Improve visability of formal park entrances and replace/add signage. Remove vegetation from
fences and repair as needed. Formalize at least one user created access points for pedestrians to
Park Entrances access the park from the east and west neighborhoods.
Improve visability of formal park entrances and replace/add signage. Remove vegetation from
fences and repair as needed. Formalize at least one user created access points for pedestrians to
Fence access the park from the east and west neighborhoods.
Ineffective and potential hazard. Remove from park. Consider low wooden guiderail along the
Cable Access Barrier driveway if vehicles accessing the multi‐purpose field is a concern.
Maintain metal benches at playground to current standard. Inspect yearly and consider
Benches replacement as part of long term goal. Remove benches in the woods.
44 DOVER PARK MASTER PLAN
Página 60
City of Dover Parks & Recreation Dover Park Master Plan 45
Página 62
VII.
IMPLEMENTATION
City of Dover Parks & Recreation Dover Park Master Plan 47
Página 63
GUIDANCE AND • On site management—Having a City staff
person on site supports park surveillance,
RESOURCES helps build confidence in park safety among
neighbors, and can provide a welcoming and
recognizable face for the park. Historically,
This section offers guidance and additional Dover Park had on-site, regular staff presence
resources for plan implementation and is at the park when the indoor recreational
organized around the three vital principles facility existed and was used for classes and
identified at the beginning of this plan: other events. From the perspective of many
■ Security / Safety key stakeholders interviewed, the removal of
the building and staff presence coincided with
■ Programming -- Activate the park a decline in the real or perceived safety of the
park.
■ Sustainable Operations / Maintenance
While the budget may not exist for daily presence
Included in this section are examples of strategies and a physical facility for a staff person, an
and resources that could be helpful as the City and incremental approach to building the presence is
community proceed with plan implementation. recommended.
The contents, however, is not prescriptive. The
City and others implementing the plan should In the immediate-term, The City should identify
use these guidelines and examples in developing what resources will allow and then develop a
their detailed approach and action plan. strategy for getting a presence in the park on
a regular basis. Currently, the City has police
Security / Safety scheduled to open and close the park gates daily,
in the morning and evening. Public Works staff also
Security and safety are a top priority. While all
visit the park weekly, though not at regular times,
elements of park design and operations are inter-
for trash collection and occasional maintenance.
related, improving park safety and improving
This presence can be complemented with a
associated public perceptions of the park should
presence oriented toward activities/programs
be an immediate priority in implementing this
and may be done once a month to begin with. For
plan.
example, a parks and recreation vehicle could be
Strategies: equipped with an identifiable vehicle magnet and
sent out to the park with the same staff person
• Enforcement—It is imperative that real
on the first Saturday morning of every month.
safety issues be addressed immediately
The vehicle can help provide the recognizable
both to stop any negative behavior and
presence and the regularity of schedule makes
cutoff potential for negative park reputation.
it easier for the park users—children and their
Consistent enforcement is likely to require
parents—to remember when a program will be
dedication of resources for an initial period,
occurring.
but in conducting the early and consistent
enforcement can ultimately reduce the need In the medium and longer-term, aim for having
for more extensive presence and dedication a regular staff presence at the park on multiple
of resources in the long-term. This early, days. This person or people need not be on-site full
heightened enforcement can help stem time, but his/her schedule should be predictable
proliferation of negative park perceptions, and coordinated to provide a presence in the
which will help grow park use for legitimate park at times most likely to provide services/
purposes and build a park user presence that programs when most convenient and attractive
serves as a supportive surveillance system. for surrounding residents/users, such as a
48 IMPLEMENTATION
Página 64
Saturday morning or early evenings from spring suggests that the park and the infrastructure
through early fall. within are not used to the fullest extent. The
recommended park design that emerged from
Examples: the planning process should help with building up
1. Partner with community organizations park use, but establishing and implementing an
to establish a presence. Work with nearby engaging, fun schedule of programs and events is
community organizations and sports leagues to the critical, complementary component.
build a strong presence in the park. Strategies:
• Programming—Community activist and city • Build a strategic program--The program,
planner, Jane Jacobs, posited the term “eyes or schedule, of activities and events for the
on the street” to reference the idea that when park should be intentional, providing for the
a space is regularly used by a range of people recreational needs and interests of nearby
it will have, in essence, a built-in surveillance residents (primary users), complementing the
system, the basis of the widely used Crime overall program offerings across the city, and,
Prevention Through Environmental Design to the extent possible, bringing in a diversity
(CPTED) approach to park and civic design. of users that will create the lively atmosphere.
Strategic park programming is an important
complement to the other security and safety Examples:
strategies described. The City should build a
repertoire of programs and events that aims 1. In the summer of 2018, the City of Dover library
to attract diverse users who will collectively system initiated a regular schedule of activities to
use the different areas of the park and use occur at the park. This program attracted children
them at different times. and adults and initiated a repeat presence of
staff. Continue this program and increasing its
Programming is addressed in more detail in the regularity, as interest grows.
next section.
2. Explore partnerships with local organizations,
Programming—activate the park such as the pickleball club, Maranatha Church,
health-promotion organizations, and economic
An important goal of this master plan is to infuse development/commerce entities with which
Dover Park with activity, not just enhance the park program and events can be scheduled for the
infrastructure and landscape. Park programming park.
is a critical component of ensuring park success
by supporting the overall community recreational • Ensure an organized, well-managed program-
services aspect of the City’ parks program, Program/event administration must also
reactivating its spaces and bringing in park users; be well-organized and managed for safety,
and supporting park security. In some cases, comfort, and reliability. Programs and events
programming might be led by the City Parks and if the user, whether he/she participates in the
Recreation Department. However, collaboration event/activity or not. This includes ensuring
in programming across departments and with events/programs follow all park rules. Issues
other organizations is another option that can such as noise and consumption of alcoholic
offer efficient use of resources and help build beverages are examples of activities that may
a more dynamic overall park program, for both be problematic. Programs and events that
regular and special events and programs. are well-organized and meet expectations
can boost park popularity and usership;
Park use is not officially tracked, however, unorganized programs and events can foster
observation of the park during seasonable disappointment, disengagement, and even be
weather conditions and other anecdotal evidence safety concerns.
City of Dover Parks & Recreation Dover Park Master Plan 49
Página 65
• Funding and budgeting—Ensuring that City overall, which are interrelated.
funding is sufficient for park development
and maintenance is fundamental to long-term Examples:
park success and sustainability. Healthy fiscal
management is the product of effective and 1. Be proactive—a little data and numbers can
proactive budgeting. The Dover Park Master mean the difference between a successful park
Plan was developed through a process that and an unused park in disrepair. Establishing
identified the important recreational needs a budget that is based on known, historical
the park should serve, evaluated how those costs for park maintenance/operations, factors
needs could best be served through physical in anticipated expenditures/revenues, and
modifications to the park, and then presented includes both regular maintenance costs and
a recommended strategy for doing so in a way sufficient funds set aside for emergencies and
that balances new expenditures with proper contingencies can help a park succeed and also
upkeep and fiscal responsibility (see previous can help streamline operations.
pages). This section offers additional guidance 2. Creative partnership—Generate community
and general strategies for approaching support for parks by forming partnerships
fiscally sound plan implementation and park with other city departments, outside agencies,
maintenance. private sector firms, and community/volunteer
Why? organizations. These partnerships can be oriented
toward park development, maintenance,
• Safe, comfortable, attractive space draws and programming and support a well-used,
users sustainable park. Examples are:
• Supports consistent maintenance • community health programs
• Safe operations • economic development
opportunities/events
• Boosts morale
• community and volunteer-supported
Strategies: maintenance programs
• Approach funding, budgeting, and • environmental sustainability/education
management from a systems level will focused
help decision-makers use resources more
efficiently and help stave off reactive and/or
deferred maintenance, which is a dangerous
point for parks. Dover Park functions as part
of an entire system of parks and recreation
facilities, providing a range of environments,
equipment, and staffing support for residents
and visitors to engage in recreational activities
and experiences in nature and the outdoors.
This individual park master plan and elements
such as budgeting, maintenance, capital
expenditures, and more, also must be
considered in the context of the full Dover
Park system. Doing so can lead to long-term
sustainability and efficiencies for Dover Park
and providing recreational resources for the
50 IMPLEMENTATION
Página 66
City of Dover Parks & Recreation Dover Park Master Plan 51
Página 68
APPENDICES
City of Dover Parks & Recreation Dover Park Master Plan 53
Página 69
APPENDIX A - SURVEY RESULTS
SUMMARY
A short survey was made available to the public during May 2018 at the Public Kickoff Open House and
by online Wikimap. Thirty-four (34) participants completed the survey. The results are presented in the
graphs and tables with brief description of findings.
QUESTION 1: WHERE DO YOU LIVE?
All partcipants responded to this question and 60% live within the City of Dover, with 27% living within
walking distance of Dover Park.
Within walking Outside of Kent
distance of Dover County
Park
(Approximately
1/4 mile)
Kent County
In the City of
Dover (beyond
1/4 mile)
QUESTION 2: LIST THE NUMBER OF PEOPLE IN YOUR HOUSEHOLD BY AGE GROUP.
All partcipants responded and most are young to middle aged adults with children under the age of ten.
20
19
13
10
9
7 7
5
Under 5 years 5-9 years 10-14 years 15-19 years 20-34 years 35-54 years 55-64 years 65 years or
older
54 APPENDIX A
Página 70
QUESTION 3: IS THERE ANYTHING THAT PREVENTS YOU OR A MEMBER OF YOUR
HOUSEHOLD FROM USING DOVER PARK?
All participants responded to this question. If yes was selected, they were asked to specify. Those results
are presented in the table on the next page. Majority of responses are safety concern and some were a
lack of accessibilty and programming.
YES
32%
NO
68%
QUESTION 3 FILL IN RESPONSES
If yes, please tell us what prevents you or a member of your household from using Dover Park.
Would not go alone, but with a group of friends and their children, safety in numbers...this is true of other
park locations statewide
Teens and adults doing illegal things
The neighborhoods on either side of the park are a little sketchy. I believe that fencing was damaged that
allowed people to use the park as a throughway. Also, the last time I visited the playground with my (at the
time) toddler we found a needle and used condom on the playground.
Crime neighborhoods around the park
One time while taking my children to the park we saw what looked like a drug deal go down. So I packed
the kids up and never went back.
Went there once and was harassed by people in the park so we left and never returned
The location of the park and safety
Not as safe as when they had an office and summer camp programs there
Dart stop Accessibility
Safety concerns and adequate lighting
Drug activitiy in area
Need more things to do in park
City of Dover Parks & Recreation Dover Park Master Plan 55
Página 71
QUESTION 4: PLEASE CIRCLE UP TO FIVE TYPES OF ACTIVITIES THAT YOU WOULD LIKE
TO BE ABLE TO DO (OR CONTINUE TO DO) IN DOVER PARK.
All participants responded to this question. Other answers included: botanical garden, splash pad,
pool, watersports, and fishing.
GARDENING 2
PLAY SOCCER 2
PLAY BASKETBALL 4
OTHER 4
PLAY TENNIS & PICKLEBALL 4
PLAY BASEBALL OR SOFTBALL 5
TAKE AN EXERCISE & HEALTH CLASS 4
PARTICIPATE IN ADULT SPORTS LEAGUES 4
PLAY DISC GOLF 6
PARTICIPATE IN YOUTH PROGRAMMING; CAMPS; SPORTS LEAGUES 9
GIVE MY PET EXERCISE 10
RIDE A BIKE 15
PLAY (ON PLAYGROUND OR OTHER UNSTRUCTURED PLAY) 20
WALK & JOG 20
HAVE A PICNIC OR SOCIAL GATHERING WITH MY FAMILY & FRIENDS 17
PARK MAINTAINED FOR ENVIRONMENTAL VALUES 18
EXPLORE NATURE (E.G. HIKE THROUGH THE WOODS, BIRD WATCH, ETC.) 23
ATTEND SPECIAL EVENTS (E.G. FESTIVAL, ART FAIR, ETC.) 22
0 5 10 15 20 25
56 APPENDIX A
Página 72
QUESTION 5 FILL IN RESPONSES
Please share your vision for Dover Park by completing this sentence:
"In 5 years I would like Dover Park to be..."
a safe, desirable place to be
a diverse community center that a person could go to have FUN!!
open at night in the summer, park personnel presence instead of cops
safe, well maintained, and used by individuals and families
Environmentally safe learning environment for the younger generation
More excitement for the children and families
Safe and open to all Dover residents
More lights, and more safer and useable for people with disability
Have more of a police presence
I believe that the park can be special and can bring people together
Back to the beauftiful park its meant to be. Vibrate with native vegitation, birds, flowers, and life. I belive
the city needs a presence in this park again. When they tore down the building ‐ it's like they completely
forgot about this wonderful asset. I want to see it taken care of with activities and facilties for all ages.
also to really offer the neighbhorhood kids a safe place to play all year long.
A safe, healthy place for residents of Dover to go and relax and enjoy the town they live in.
Not as sketchy and more family oriented.
In 5 years I would like Dover Park to be a place that I can safely visit with my children. I place that I can use
as a destination for my walks with my dogs. A place I can invite friends to get together with me in a safe
environment.
A safe place for all families!
green as possible and safe
A sustainable park that enhances the quality of life of local residents.
I would love to see a bontanical garden or an outdoor musical playground. Something unique and
interesting for Dover.
The go to park for families to enjoy time together in a safe, clean environment
a place for all people.
A great environmental space for all to enjoy. Please incorporate environmentally friendly designs into the
plan.
A friendly park with a large playground and nice jogging trails with fitness equipment stops along the way.
Cleaned and Maintained regularly.
clean, safe and functioning for families with active lifestyles. It would be wonderful if the park gave a
feeling of safety and vitality.
I envision up kept spaces, nicely maintained walking paths/ bike paths, a park guide/ safety monitor and
potentially a new entrance from a better part of town.
Water play ‐ spray park, kiddie pool nothing for kids to do in summer...now that Silver Lake has been
closed for so long We cant afford the Y or get over to the other side of town for swimming
Running trails updated and larger playground. Sprinkler for kids
A preserved woodland with walkable paths
Still a forest with preservation policies in place. I would not like to see park access from Nixon Lane
Would like to see it ket up better. Maybe a building for doing activities year round. Maintain the lights for
safety at night and walk/jogging paths. Make access from different locations easier, maybe even parking
by the other entrances.
City of Dover Parks & Recreation Dover Park Master Plan 57
Página 73
WIKIMAP COMMENTS AND MAP
Comment
Comment
Category
The fact that it is surrounded by an area with a lot of crime is a weakness. Try cleaning up crime in Town Point and
Weakness surrounding areas before you start worrying about parks.
Opportunity Opportunity to clean up the crime in the area instead of worrying about spending tax money on parks.
Strength One of the few remaining areas in Dover that doesn't have houses
Opportunity Would be nice to have an access from Acorn Lane
Weakness Vegetation needs to be controlled. Will help make the park safer with better sight lines.
Strength Playground is nice.
Opportunity Nice to have a path/sidewalk into the park from Acorn Lane
Weakness Need better signage. Old sign is worn & hard to read.
Strength Basketball & tennis courts just need a sprucing up.
Opportunity Maybe another pavilion for picnics
Opportunity Dog park area
Opportunity handicap accessible walking paths
Weakness Increase in police presence
Opportunity maintain fencing for area residents who don't want to be used as a cut through
The entrance to the park on white oak is an favorable location. I do not feel safe going into the park with my
Weakness children.
Opportunity Opportunity for a better entrance to the park (less foot traffic from the local liquor store).
Relocate playground and picnic areas here. Provide walking paths around the playground. Consider resizing the
Opportunity baseball diamond, or putting in a batting cage instead.
Strength Keep forested area in tact, but create marked bike/hiking paths
Opportunity Relocate baseball diamond here.
Add entrance here with 5 or 6 parking spots and with a starting point for a jogging trail/walking path into the rest of
Opportunity the park.
58 APPENDIX A
Página 74
City of Dover Parks & Recreation Dover Park Master Plan 59
Página 75
APPENDIX B - PUBLIC MEETING BOARDS COMMENTS
Community Vision Wall ‐ List one thing you would
keep/preserve in the park. List one thing you would change.
Public Comments
KEEP/PRESERVE CHANGE
Basketball Water, shower towers
Tennis/soccer Bathrooms, pavilion for outdoor exercise
Tennis courts Arcade
Tennis courts Upgrade bathrooms
Basketball courts, tennis courts More grills
Tennis courts Fountain focal point
As much of the woods as possible Fun thing for kids
Woods Add splash pad. Maintain undergrowth
Softball diamond Skateboard area
Play area for children with health disabilities
Small soccer fields for 1v1
60 APPENDIX B
Página 76
Community Vision Wall ‐ Please complete the following
statement ‐ "In five years, I want Dover Park to be.."
Public Comments
A community garden where anyone of all ages can work.
Cultural center with classes for all ages
Weekly community garden for all ages.
A sustainable places for trees and flowers to grow. Possibly a garden or adding forest tours.
Community Center
Horseshoe pits
Full of color!
Dog park
Ping pong
Candy shop for kids
BBQ Pits and pavilions
Keep nature alive and four square
Cooking for kids and free candy
Cooking class for kids
Colorful, crime free ‐ safe
Classes for kids
We wish to have a splash park for kids
Free food
Gaming Card Shop
Keep wildlife in mind, eliminate non‐native species of plants, any new plantings should be
native, there are perfect open areas for a butterfly/pollinator garden
A pool
Gi Gi ball
To have a popup adventure playground
We need a public swimming pool
A place of recreation and fun but also for nature and animals
A stage! Have performers that interact with the audience or talent shows
Summer camps
During the summer hire only young women who genuinely care about the welfare and
needs of kids enrolled in summer camps.
A place where I can run (path around the whole park), a secure place (solar lights),
environmentally safe place, well kept, a place where concerts can be held sometimes
(portable stage), a patroled place where no drug activity takes place.
Open evening concerts in summer, open at night for picnics, lighted basketball/tennis courts
A crime free, fun, clean place to take the family with daily activities. A scheduled events
calendar Mon‐Fri with themed activities. +1 +1
City of Dover Parks & Recreation Dover Park Master Plan 61
Página 77
Accessibility and Circulation Overview
Public Comments
Wayfinding within the park needed!
Walking path from Acorn Lane to main part of park starting at
Acorn Land and Revolutionary Avenue Intersection. plus 1
added by another participant
Park drive lights burned out
Lighting around basketball courts
Would not want fence removed between Dover Park and Girl
Scout Lane nor entrance opened from Nixon Lane
Not enough advertising for the park
Activity and Programming Overview
Public Comments
Bocce Courts
Restrooms/Water fountains
Restrooms/Water fountains
Job fairs held in pavilion and on the field
BBQ grills
Provide a safe activity that promotes nature
We need a community building at Dover Park
BBQ facilities
Better utilization of tennis courts ‐ offer lessons, etc. Splash
pad where building used to be. Infrastructure in place ‐
beneficial/easy access for Manchester Square kids. Large
walking/bike path network. Evening concerts similar to
concerts on the Green.
Another vote for each of the above. Splash pool, concerts ‐
evening, tennis courts, bike/walk path
Spinning chair (type of play equipment)
More paths/nature walks
Indoor gym for youth to play basketball. Indoor sports
exercise classes
Jogging/biking path. plus 2 added by other participant s
62 APPENDIX B
Página 78
Vegetation and Environment Overview
Public Comments
Cut down the brush from 6' down!
This is the most tranquil place in the park ‐ please preserve.
Arrow to the evergreen forest photo. Another partcipant put
a +1 after comment.
Bird feeders to attract bird watchers! Two other partcipants
added a +1 after comment
Evergreen forest is really cool and appropriate for disc golf.
Short holes are good for beginners.
Fishing pond
Maintenance and Operations Overview
Public Comments
Wesley College envrionmental master programs may help
maintain park.
Social media for school districts for planning and
implementation
Lights that automatically turn on and security cameras
Delaware State University ‐ Fraternity/Sorority
More Police. Ditto!
Adopt a park! Fraternity/Sorority
Volunteers to maintain
Volunteers to maintain
Park rangers and Patrol men
Park rangers and Patrol men
No removal of existing trees
Federal grants for funding. Private sponsors for tax write off.
Business sponsor donations
City of Dover Parks & Recreation Dover Park Master Plan 63
Página 79
PETITION TO ANNEX AND REZONE PROPERTY
Before the Dover City Council Committee of the Whole - Utility Committee
August 28, 2018
File Number: AX-18-02
Ordinance Number: 2018-09
Applicant: Steven E. Andrew
Owner of Record: Steven E. Andrew
Property Address: 179 Mifflin Road
Tax Parcel ID #: ED-00-076.10-01-32.00-000
Lot Size: 1.37 acres +/-
Present Zoning: RS-1 (Single Family Residential Zone)
Proposed Zoning: R-8 ( One Family Residence Zone)
Comprehensive Plan Category 1: High Priority Annexation Areas
Designation:
Comprehensive Plan Low Density Residential
Land Use Designation:
Present Use: Single Family Detached Dwelling
Proposed Use: No Proposed Change
Utility Availability: Water and sanitary sewer service is available within Mifflin
Road. The property owner would be responsible for the costs
associated with tapping the water and sanitary sewer mains
extending services to the property, payment of impact fees, and
obtaining permits associated with such improvements.
The property is not currently served by City of Dover Electric; it
appears to be served by overhead line at the rear of the properties
by another service provider. The property owner would be
responsible for the costs and installation of certain equipment to
the City’s specifications in order to extend City Electric Service
to the property.
Staff Recommendation: Staff recommends that the City proceed with annexation of the
subject property.
Página 80
City of Dover Application No.: AX-18-02
Department of Planning & Inspections
Farmview Dr
R-8
R-8 R-8
Faw n St
RG-2
RG-2
ill Dr
Woodm
RG-2
R-8
Site
R-8
ROS
R-8
RM-1
ar Dr
Trafalg
ifflin
M
RM-1 Rd
R-8
R-8
Title: Steven E. Andrew
Legend
Address: 179 Mifflin Road Dover Boundary
Parcel ID: ED-00-076.10-01-32.00-000
Proposed Zoning: R-8 (One-Family Residence Zone) Zoning
Owner: Steven E. Andrew Dover Parcels
Date: 8/14/2018
Kent County Parcels
Subject Property
« 0 125 250 500 Feet
2012 Buildings
Página 81
ACTION FORM
PROCEEDING: CCW – Utility Committee AGENDA ITEM:
DEPARTMENT OF ORIGIN: Public Works DATE SUBMITTED: 08/17/2018
PREPARED BY: Sharon J. Duca, P.E., Public Works Director / City Engineer
SUBJECT: Evaluation of Bids – FY 2018 Street & Alley Program
REFERENCE: CIP – Street, Concrete and Alley Program
RELATED PROJECT:
APPROVALS: City Manager, Controller
EXHIBITS: Aerial Maps
EXPENDITURE REQUIRED: $1,032,968.00 Est. AMOUNT BUDGETED: $1,549,625.76
FUNDING SOURCE (Dept./Page in CIP & Budget): Multiple Funding Sources: General Fund - $649,500,
ST1801, Account No.: 147-1800-554.40-31. Community Transportation Funds - $412,325.76, CT1833, CT1896
and CT1904, Account No.: 318-9900-582.40-31. State of Delaware Bond Bill Proceeds - $500,000, ST1908,
Account No.: 318-9900-582.40-31
TIME TIMETABLE: Notice to Proceed to be issued within 60 days of Council approval. Project anticipated to be
completed in 120 calendar days from Notice to Proceed issuance, weather permitting.
RECOMMENDED ACTIONS: Award a unit price contract, based upon Bid #18-0039PW for the FY 2018 Street &
Alley Program to Grassbusters Landscaping, Inc. based on the Prevailing Wage unit prices for each work item
submitted. The estimated value of the contract is $1,032,968.00. Work will be performed in strict accordance
to the Bid Specifications.
BACKGROUND AND ANALYSIS
In concurrence with the City of Dover’s Capital Investments Plan, it is proposed to rehabilitate various pavement
and concrete sections throughout the City of Dover. The total length of scheduled street repaving is
approximately 7,973 linear feet, or 1.51 miles. Along with repaving, this project includes the following: install
37 inlet protections, remove and replace approximately 270 linear feet of Type I Curb, remove and replace
approximately 3,588 linear feet of Type III Curb and Gutter, remove and replace approximately 13,576 square
feet of 6” driveway apron, remove and replace approximately 23,100 square feet of 4” concrete flatwork,
remove and replace 18 catch basin frame and head, install approximately 110 linear feet of valley gutter, install
approximately 70 linear feet of new Type III Curb and Gutter, install approximately 5,975 square feet of new 4”
concrete flatwork, installation of 580 square feet of detectible truncated domes, and 401 cubic yards of graded
aggregate. Contractors will also prepare approximately 32,616 square yards of subgrade for resurfacing or
paving, including any cleaning, sweeping, root mat removal, manhole and valve lid adjustment, roto-mill 65,253
square yard-inch of bituminous pavement. Contractors will overlay approximately 3,721 tons of type “C” hot
mix, patch 5 square yards of roadway using type “C” hot mix. Other items included in this project includes 1,060
linear feet of double yellow solid striping, 530 linear feet of single white solid striping, 420 linear feet of single
dashed striping, 12 painted arrows, 251 linear feet of stop bar, 168 crosswalk bars, and 5 traffic signal loops.
Página 82
ACTION FORM
Evaluation of Bids – FY 2018 Street & Alley Program
Page 2 of 2
The following locations were included in the proposed scope of work to be completed under the FY 2018 Street
& Alley Program:
STREET NAME / EXHIBIT TITLE
MOCKINGBIRD AVENUE
S. NEW STREET
BUTTNER PLACE
BERTRAND DRIVE
REESE STREET
BLUE HEN BLVD.
HOPE STREET
Bids were opened on Tuesday, July 17, 2018. Six (6) contractors submitted unit price bids for the proposed work
to be performed. Based on the proposed quantities, the estimated contract values are as follows:
CONTRACTOR LOCATION BASE BID TOTAL COST EVALUATED PRICE
GRASSBUSTERS LANDSCAPING, INC. NEWARK, DE $1,032,968.00 $1,032,968.00 $1,032,968.00
SAM’S CONSTRUCTION, LLC WILMINGTON, DE $1,383,491.60 $1,383,491.60 $1,383,491.60
A-DEL CONSTRUCTION, INC. NEWARK, DE $1,576,743.36 $1,576,743.36 $1,576,743.36
ALLEN MYERS MD, INC FALLSTON, MD $1,721,474.52 $1,721,474.52 $1,721,474.52
REYBOLD CONSTRUCTION GROUP, LLC BEAR, DE $1,821,029.34 $1,821,029.34 $1,821,029.34
GEORGE & LYNCH, INC. DOVER, DE $2,006,192.79 $2,006,192.79 $1,946,007.00*
*- George & Lynch, Inc., was awarded a 3% reduction, due to local vendor preference
City staff reviewed the submissions and found that the Grassbusters Landscaping, Inc. bid met all requirements for the
qualifications of the project. The staff recommends awarding the contract to Grassbusters Landscaping, Inc. in the amount
of $1,032,968 for the FY 2018 Street & Alley Program.
Página 83
E
IRD AVENU
MOCKINGB
LEGEND
Página 84
LEGEND
REET
W ST
S. NE
Página 85
LEGEND
CE
LA
RP
NE
TT
BU
Página 86
FOREST STREET
BERTRAND DRIVE
LINCOLN STREET
LEGEND
ROAD REPAIR
CONCRETE REPAIR
NOTE: THIS MAP IS FOR ILLUSTRATIVE PURPOSES
ONLY. ACTUAL LOCATIONS OF IMPROVEMENTS TO BE
FIELD VERIFIED.
Página 87
REESE STREET
PAUL STREET
LEGEND
ROAD REPAIR
CONCRETE REPAIR
NOTE: THIS MAP IS FOR ILLUSTRATIVE PURPOSES
ONLY. ACTUAL LOCATIONS OF IMPROVEMENTS TO BE
FIELD VERIFIED.
Página 88
VD.
N BL
S. E
BA U EH
YR BL
D
OA
LEGEND
ROAD REPAIR
CONCRETE REPAIR
NOTE: THIS MAP IS FOR ILLUSTRATIVE PURPOSES
ONLY. ACTUAL LOCATIONS OF IMPROVEMENTS TO BE
FIELD VERIFIED.
Página 89
HOPE STREET
S GOVERNORS AVE.
S STATE STREET
S BRADFORD STREET
LEGEND
ROAD REPAIR
CONCRETE REPAIR
NOTE: THIS MAP IS FOR ILLUSTRATIVE PURPOSES
ONLY. ACTUAL LOCATIONS OF IMPROVEMENTS TO BE
FIELD VERIFIED.
Página 90
MEMORANDUM
Department of Planning & Inspections
P.O. Box 475
Dover, Delaware 19903
Phone: 302.736.7196 Fax: 302.736.4217
DATE: August 17, 2018
TO: City Council Committee of the Whole: Safety Advisory & Transportation
Committee
FROM: Dave Hugg, Director of Planning & Inspections
Planning, Inspections, and Fire Marshal Staff
SUBJECT: Debriefing/Post-Mortem Report on 2018 Firefly Music Festival
The 2018 Firefly Music Festival was held June 14 through June 17, 2018 in The Woodlands located
at the Dover International Speedway. An event such as this involves multiple sections of the
Department including: Fire Marshal’s Office, Planning Office, Permitting & Licensing, and Code
Enforcement. The following summary of activities is provided. Also attached is the 2018 Firefly
After Action Report from the Fire Marshal’s Office.
Licenses & Permits
Temporary Firefly Music Permit for Event $500
Outdoor Activity Festival 2018
Permit
Temporary Dover International Existing Permit for $500
Camping Areas Speedway 2018 was amended
for this event
Business Licenses Red Frog Entertainment Agent $188
(Festival Grounds) Entertainment
Red Frog Open Market Operator $1623
Entertainment (106 vendors)
Fireworks Permits (Each Show 6 Fireworks Events @ $150
Producer) $25 each
Special Event Backyard Bizarre Special event permits $50
Permits and Center for Bio @ $25 each
Ethical Reform
RV/Camping South of Leipsic Fee per number of $75
Permits (Non- Road Site (Kozel), camping units
Festival Areas) Pugh’s and Home
Depot Site
Business Licenses Itinerant Merchant 18 Licenses @ $100 $1800
(Non-Festival Licenses each
Areas)
TOTAL Fee $4886
Revenue
Página 91
Debriefing Report for 2018 Firefly Music Festival Event
Page 2 of 2
Staff Activities & Hours
Planning Office (Planning Review of Permit submission 1 hour
Director) as Temporary Outdoor
Activity Permit Submission
per Zoning Ordinance,
Article 3 §18.1(l) and (m)
Permits & Licensing Staff Processing of Permits & 1 hour
Licenses for payment and
issuance
Code Enforcement Staff Business License Checks in 4 hours
Non-Festival Areas
(Thursday & Friday)
Fire Marshal’s Office Pre-Planning Meetings 241 hours
Permit Reviews
On-site at Event (Load-in,
Inspections, Fireworks, etc.)
TOTAL Staff Hours 247 hours
Overall, the 2018 Firefly Music Festival event went smoothly. For our Department, this activity
involves permitting and licensing activities and on-site inspections (before and during event). Since
the festival event occurs on property zoned RC (Recreational and Commercial Zone), the Zoning
Ordinance, Article 3 §18 contains specific provisions for permitting of a Temporary Outdoor
Activity. This is slightly different than a Special Event Permit.
Communication and planning for this event occurs throughout the year. With the 2018 event, the
Fire Marshal’s Office also utilized a mobile data collection method developed with the City’s GIS
(Geographic Information System) staff. Communication at various levels will be especially
important in the coming year with the transition in event ownership. This Department of Planning
and Inspections enjoys great communication with both Dover International Speedway and Red Frog
Entertainment in regards to the planning and execution of the event; and we are confident that we
will continue this positive relationship.
Staff has identified a number of areas where improvements can be made in future years in the pre-
event planning, permitting and in the implementation. These areas for improvement are further
detailed in the attached Fire Marshal’s Report. In general, these improvements focus on the
following topics: Festival set-up items; Rules and Management of Camping Areas; Roadways in
event areas; Fire Protection Elements; and Emergency Planning. Staff also has identified the need
for some potential Code amendments that we will be working to bring forward in the coming year as
Ordinances for consideration.
Attachment:
• 2018 Firefly After Action Report, Fire Marshal’s Office
Página 92
2018 Firefly After Action Report, Fire Marshal’s Office
- The Fire Marshal’s Office is onsite to ensure that all Fire and Life Safety items are in place and
adhered to for the citizens, staff, and attendees of the Firefly Music Festival to have a safe and
enjoyable experience.
- The Fire Marshal’s Office is in constant communication with Dover International Speedway, Red
Frog Events, and AEG throughout the year in preparation for the Firefly Music Festival.
- The Special Event Permit is turned into The City of Dover at least a month ahead of time. This
permit is reviewed by staff who has input on all special event permits. Any changes to the
festival after the permit submission is approved must be done through change orders submitted
to Dover International Speedway and the Fire Marshal’s Office. These changes must be
approved by both agencies.
- There were also several other permits submitted by individuals not associated with Dover
International Speedway/Red Frog Events/AEG who conduct business offsite during the festival.
Staff reviews these permits and checks on them as well.
- The Fire Marshal’s Office always had at least one person onsite for the festival (when the festival
was open). This year, we were onsite 24/7 for load in and we were assisted by Code
Enforcement staff to accomplish this. The current three staff members and one Code
Enforcement Officer put in a total of approximately 241 hours between Monday morning and
Sunday evening. The following was conducted by staff who were onsite:
o Staffed utilized a new layer through the City of Dover GIS system which was created by
Mark Nowak. While utilizing this system, staff plotted 144 “incidents” to include, but not
be limited to, mobile/temporary cooking issues, FM contacted for information,
emergency/exit light issues, meetings, electric department access, pyrotechnics
preshow review, pyrotechnics show, EMR contact, open flame issues, and egress issues.
I want to thank Mark Nowak for all his assistance with this new layer which we will
continue to utilize.
o Staff conducted a walkthrough of the entire festival. Several items were noted and
passed onto Dover International Speedway to ensure compliance. Staff continued
checking the festival during the remainder of the week.
o Staff was onsite to ensure load in was conducted in accordance with office
requirements.
o Staff was onsite for pyrotechnics preshow review. Staff was on stage when pyrotechnics
were conducted. 6 shows had pyrotechnics this year which is an increase from last year.
o Several drivable surfaces were installed in accordance with an agreement made with
Red Frog. Next year is the last year of the agreement made which will have most of the
required roads completed.
o We answered several questions that security had during the vehicle searches (this was
the first year that this was conducted).
o Staff assisted the electric department with access to areas needing to be checked due to
a credentials issue.
Página 93
o Staff assisted EMS staff
o Staff assisted Dover International Speedway security with noncompliance of camping
rules (cars in the fire lane)
o Staff assisted with a large crowd at the entrance of the festival on Saturday
- Items to address for the next festival:
o Mount Fire extinguishers on stages in fixed locations.
o Dover International Speedway security is needed in Lot 2 during load in (like lot 18). This
is to ensure vehicles are pulled in and not turned around. This should continue to be
monitored throughout the week like lot 18.
o The vendor camping behind the North Hub needs to be marked out like the other lots
and all rules apply to this lot as well (constant issue).
o All cooking needs to be conducted under a flame-retardant tent. Several tents were
flame resistant which included other questionable language. These tents were relocated
this year. In the future, they will be required to be taken down.
o Ensure all propane tanks are properly secured
o No household furniture is permitted in the camping lots. One couch made it into lot 18.
We will need a contact for the trash company to pick these items up immediately next
year.
o The Loft needs to be discussed in detail. We will not allow the fence/chain/rope to be in
place. Any means of egress needs to be free. We can discuss what needs to be done if
there is a desire to secure sections appropriately. I suggest that swing type doors be
installed that read emergency exit only.
o Complete roadways per the Red Frog agreement. Additional areas will need to be
discussed and installed prior to the 2020 festival.
o Emergency lights and exit lights need to be operable. This is a continuing issue. All
electrical cords need to be out of reach and the connections need to be taped so they
cannot be unplugged.
o The structure in lot 9, third party inspection was never received.
o All appropriate parties need to discuss and review the rules. Everyone should
understand and enforce these rules. These rules need to be updated on the website and
the app. In addition to other rules, no generators, charcoal grills, or open fires are
allowed. I will review the Firefly website and submit additional comments. When
purchasing tickets, the fans should have to acknowledge that they have read the rules.
o The platform above the Progressive bus was used prior to a third-party inspection taking
place
o Some back of house Fire Lanes were impeded (mainly in Division 2/3). I believe this was
due to there being additional space last year; however, the festival was brought back to
normal conditions this year.
o We would like to mark the lot 18 middle fire lane with the street signs
Página 94
o Need to ensure specific language is in the rules regarding the type of vehicles, tents, and
how vehicles are parked/tents are placed.
o Emergency plan needs to be submitted to this office
o Need to ensure that there is always fire protection on both sides of the bridge
o Discussion needs to take place with the City of Dover City Solicitor about the special
event permit.
o This office will be working with the Planning office to propose new fees and fines to the
Legislative and Finance Committee and Planning Commission. We are hoping to have
this on the October agendas.
- This was another successful festival within the City of Dover. I appreciate the outstanding
working relationship our agency has with all the other agencies onsite. A special thank you goes
to Mark Hostetter and Jim Hosfelt of Dover International Speedway who the City of Dover Fire
Marshal’s Office mainly deals with for Fire and Life Safety compliance. We also look forward to
working with AEG this year for the 2019 Festival.
-
Página 95
2018
Dover Police Department
Firefly Music Festival
After Action Report
Wednesday June 13, 2018 to Monday June 18, 2018
Página 97
2018 Dover Police Department Firefly Music Festival After Action Report 7/18/2018
1. EXECUTIVE SUMMARY:
This report is produced to assist the Dover Police Department, Red Frog Events,
Anschutz Entertainment Group (AEG) and the Dover International Speedway in
identifying issues that emerged during the Firefly Music Festival and is being prepared by
Lt. Kevin Kober, Special Enforcement Unit Commander of the Dover Police Department.
The Dover Police Department’s Mission Statement during this event was to secure and
deploy the law enforcement resources necessary to protect and serve the interest of the
citizens and City of Dover, while preserving the peace and ensuring that pedestrian and
vehicular traffic flow in an orderly and systematic manner during the six days involving
the Firefly Music Festival Weekend.
The Firefly Music Festival venue was split in years past between the jurisdiction of the
Dover Police Department and the Delaware State Police. However, the area known as
Division 3 and Lot 18 were annexed into the City of Dover and now fall under the
Dover Police jurisdiction. Each agency works in conjunction with each other but is
responsible as being the primary law enforcement agency to respond to and deal with
complaints in their respective jurisdiction.
1.1 The Dover Police Department’s Objectives were:
1.1.1 To maintain a professional, courteous presence during all activities
associated with the event.
1.1.2 Identify, control and/or remove conditions that could threaten the public
safety.
1.1.3 Practice pro-active policing ideas while addressing any criminal activity
with the appropriate law enforcement response.
1.1.4 Network with and employ the assistance of other law enforcement
agencies as needed to ensure public safety and smooth flow of traffic.
2. ESTIMATED ATTENDANCE & TIMES OF EVENTS:
The attendance for the event was not released this year by the promotors. An educated
guess using past crowd size as gauge would be around 30,000 of those attending
camping in the various campgrounds and approximately 80,000 in festival area during
active hours. (Note: Camping sites sold and parking areas were located solely in Dover
PD jurisdiction.)
Camping for the event began at 0600 on Wednesday, June 13, 2018 and ended on
Monday, June 18, 2018 at approximately 1100 hours. The campers were provided with
the rules of camping upon their purchase of the camp sites as well as the rules were
posted on the Firefly website.
2
Página 98
2018 Dover Police Department Firefly Music Festival After Action Report 7/18/2018
The promoter and city agreed that the music event was to start at 1200 hours each day and
was scheduled to end at 0200 hours on Friday and Saturday and 2400 hours on
Thursday and Sunday. Red Frog/ AEG also had the "Hub" area open nightly after the
venue was cleared for concert goers to enjoy additional activities.
3. PRIVATE SECURITY:
The promoter, Red Frog Events/ AEG, contracted with Dover Downs International
Speedway (DIS) and private security companies to staff different aspects of the venue.
The role of private security at the event was to identify, control, and/or remove conditions
that could threaten the peace, safety, and property of spectators, vendors, and/or staff
at the event. Private security guards and event staff, staffed all entry and exit gates,
as well as staffing all security posts, camping and parking areas, on both the exterior and
interior of the event and camping. The private security company was responsible for
conducting searches of all persons and property brought into the event. Additionally,
DIS was required to manage all alcohol sales and operations due to their license
requirements. DIS bartenders/servers were responsible for checking the identification of all
patrons in any of the festival venues that served alcoholic beverages.
The security companies were a key element in the safety and security of the event. The
following is breakdown of the security companies and their responsibilities during the
event.
3.1 CSC handled all of the stage security
3.2 CSC-Division 2 and all VIP viewing areas
3.3 DIS Security handled the parking lot and camping areas
3.4 BCM West Entry Gate and Division 1
3.5 APEX Vehicle Entry Control Points
3.6 RMC East Entry Gate and Division 3
Private security was also responsible for patrolling the camping/parking lot areas 24
hours a day during the entire event. Security was responsible for deterring minor
incidents in the parking lots such as tailgating, drinking, overnight camping and thefts
as well as deterring minor incidents such as loud/disorderly persons and thefts from the
camping areas.
During the event, the security staff liaised with law enforcement and handled all minor
infractions that occurred on the event grounds, camping and parking areas. Large-scale
crime issues were referred by the private security company to the Command Post for
appropriate law enforcement intervention as deemed necessary by the Incident
Commander of that respective jurisdiction.
3
Página 99
2018 Dover Police Department Firefly Music Festival After Action Report 7/18/2018
4. AGENCIES INVOLVED:
4.1 Dover Police Department - As the primary law enforcement agency
managed and deployed other law enforcement agencies as needed and
retained law enforcement management responsibility for events that
occurred in the jurisdiction of the Dover Police Department. They were
also utilized to monitor, direct, and control traffic (pedestrian and vehicle)
ingress and egress to the event in conjunction with the Delaware State
Police, Delaware Department of Transportation and Dover Downs
International Speedway and provided law enforcement/security at the
venue.
4.2 Delaware State Police - As the secondary law enforcement agency
managed and deployed and retained law enforcement management
responsibility for events that occurred in their jurisdiction and Lot 18.
They were also utilized to monitor, direct, and control traffic (pedestrian
and vehicle) ingress and egress to the event in conjunction with the Dover
Police Department, Delaware Department of Transportation and Dover
Downs International Speedway and provided law enforcement/security at
the venue.
4.3 Dover Fire Company – As the primary fire company was responsible
for the overall fire safety and medical transportation during the event.
Dover Fire coordinated with other fire companies to have ambulance and
fire equipment staffed for the event which was supervised by a Fire
Officer that was stationed at the Command Post. Due to the promoter of
the event having a pyrotechnics display planned during the event, a Fire
Marshal and Engine Crew was also present to monitor all pyrotechnic
operations.
4.4 Little Creek Fire Company - was responsible for hazardous material
safety.
4.5 Belvedere Fire Company - was responsible medical transportation.
4.6 Bridgeville Fire Company - was responsible medical transportation.
4.7 Hartley Fire Company - was responsible medical transportation.
4
Página 100
2018 Dover Police Department Firefly Music Festival After Action Report 7/18/2018
4.8 Delaware City Fire Company - was responsible medical transportation.
4.9 Leipsic Fire Company - was responsible medical transportation.
4.10 Carlisle Fire Company - was responsible medical transportation.
4.11 Christiana Fire Company - was responsible medical transportation.
4.12 Farmington Fire Company - was responsible medical transportation.
4.13 Kent County EMS – was responsible for any severe or serious medical
emergencies that cannot be treated by the on-site event first-aid staff.
4.14 Cheswold Police Department – was utilized in the area of Dover mall
by the ‘will call’ booth for security.
4.15 Smyrna Police Department - was utilized to direct and control traffic
ingress and egress for the event as well as patrol the parking lot, festival
grounds and camping areas.
4.16 Milton Police Department - was utilized to direct and control traffic
ingress and egress for the event as well as patrol the parking lot, festival
grounds and camping areas.
4.17 Wyoming Police Department - was utilized to conduct security at festival
grounds cash house and was utilized to direct and control traffic ingress and
egress for the event as well as patrol the parking lot and camping grounds.
4.18 Delaware State Police EOD – was utilized to respond to and deal with any
suspicious packages or items found or left in and around the grounds of the
festival area and as well as Dover Downs property.
4.19 Delaware Alcohol Tobacco Enforcement (DATE) – staffed the event
and provided uniformed and non-uniformed staff to monitor DATE
compliance and assist with the interior event security and U/C operations.
4.20 Delaware Joint Terrorism Task Force (JTTF) – was utilized to
provide undercover operations dealing with security issues in the
parking areas and inside of the venue.
5
Página 101
2018 Dover Police Department Firefly Music Festival After Action Report 7/18/2018
4.21 Dover Police Department Drug, Vice, Organized Crime Unit (DVOC)
– was utilized to assist with security issues in the venue and the parking
areas surrounding the venue. DVOC officers were used to identify any
potential drug/crowd related problems.
4.22 Clayton Police Department - was utilized to direct and control traffic
ingress and egress for the event as well as patrol the parking lot and
camping grounds.
4.23 Delaware Fire Police - were utilized to direct and control traffic ingress
and egress for the event.
4.24 Wilmington Manor Fire Company - was responsible medical
transportation.
4.25 Goodwill Company - was responsible for medical transportation.
4.26 Houston Fire Company - was responsible for medical transportation.
4.27 Indian River Fire Company - was responsible for medical transportation.
4.28 Kent & Queen Ann Rescue MDy - was responsible for medical
transportation.
4.29 Lewes Fire Company - was responsible for medical transportation.
4.30 Marydel Fire Company - was responsible for medical transportation.
4.31 Mid Sussex Rescue - was responsible for medical transportation.
4.32 Odessa Fire Company - was responsible for medical transportation.
4.33 Townsend Fire Company - was responsible for medical transportation.
5. COMMAND POST OPERATIONS:
An onsite Command Post was utilized for this event and was located at the southwest
corner of Dover Downs Speedway property which is just north of Control Point #1
located on Leipsic Road.
6
Página 102
2018 Dover Police Department Firefly Music Festival After Action Report 7/18/2018
The Command Post served as the logistical center for the Dover Police Department,
Delaware State Police, Dover Fire and other involved Fire, Law Enforcement and
Security agencies. The Command Post served as the central point of contact for all event
supervisors and the promoter.
Media and non-law enforcement personnel were not allowed to access any of the
designated Command Post areas unless authorized by the Officer in Charge (OIC) or his
designee.
6. COMMUNICATIONS:
The Firefly Festival was operated off of one radio frequency (KIOP2) for officers
working traffic posts and security posts such as Festival and Campground Rove Patrols.
This frequency was utilized by all law enforcement agencies.
A Dover Police Department Dispatcher staffed the Command Post 21 hours a day during
the event. The Dispatcher handled all law enforcement event radio traffic and maintained
a call log of important and relevant information and incidents.
Cellular phones were used as the primary means of communication with the undercover
officers.
7. LOGISTICS:
All uniformed personnel were required to wear their reflective vest or the Dover Police
Department high visibility Special Events Uniform, while on duty. Those that did not
have one accessible were issued one to use during the duration of the event.
It was also anticipated that golf carts, flares, narcotics test kits, office supplies, office
equipment, water, food, and other law enforcement equipment was going to be needed to
properly carry out this plan. The Dover Police Department, Red Frog, Dover Downs
International Speedway, Dover Fire, and the Delaware State Police provided the
necessary logistics and support.
Equipment was issued at the time of check in at the Command Post or public safety
compound. All issued equipment to include golf carts, radios, credentials, and
operational books were required to be turned in immediately after the officer’s assigned
shift.
8. INTELLIGENCE:
The Delaware Information and Analysis Center (DIAC), Delaware’s Fusion Center
which serves as a critical component of Delaware’s Homeland Security as well as
Criminal Intelligence, Critical Infrastructure Protection and Statewide Law Enforcement
investigative support prepared a threat assessment regarding the events associated with
7
Página 103
2018 Dover Police Department Firefly Music Festival After Action Report 7/18/2018
the Firefly festival and distributed same to the appropriated agencies that needed the
information. Threat condition issued by DIAC was ELEVATED for the duration of the
event.
9. FIRST AID/MEDICAL AID:
DIS and Red Frog/ AEG provided contracted medical services (doctors and nurses) and
staffed first aid stations throughout the venue. Kent County EMS personnel were also on
hand to respond to calls for service.
The ambulances from the respective fire companies mentioned in paragraph 4 were
stationed at strategic locations throughout the festival and also at the public safety
compound located at the back-a-house area and were available for response and transport
if necessary. Dover Fire was in contact with the EMS supervisor as well as other medical
staff at the event and coordinated any ambulance transportation that was required. All
serious medical needs were transported to the Fan Care Center or Bay Health/KGH.
10. CALLS FOR SERVICE:
Traditionally, an event of this type averages 10-20 arrests a day along with numerous
EMS calls. It was anticipated the number of arrests would be similar in nature and would
range from illegal drugs to disorderly subjects. Officers were discouraged from
attempting to make routine arrests often encountered with these types of events. The on-
site private security was given the first opportunity to resolve these types of problems.
Police officers became involved only when absolutely necessary and/or when requested
by private security.
The Joint Command Center/ Dover Police Department received 120 complaints related to
the Firefly Events from Wednesday June 13 at 0830 hours to Monday, June 18, 2018 at
1230 hours. Key complaints are broken down as follows:
(1) Death Investigation
(2) Domestic Incident
(2) Property Damage Crashes
(2) Personal Injury Crashes
(4) Assault
(12) Disorderly conduct
(7) Drug
(0) Fire
(1) Fraud
(1) Harassment
(0) Missing person
(2) Assist other agency
(0) Public Assist
(0) DUI
8
Página 104
2018 Dover Police Department Firefly Music Festival After Action Report 7/18/2018
(1) Found property
(5) Suspicious events
(31*) Thefts
(2) Welfare Check
(0) Alcohol Violations
(0) Animal Complaints
(3) Criminal Mischiefs
(0) Fights
(2) Psychiatric Event
(0) Terroristic Threatening
(1) Traffic Violations
(12) Trespass
*There were a total of 187 victims of cell phone thefts and wallet/ purse thefts. Due
to the extremely high volume, reports were grouped by time and location.
The following were significant investigations made by Dover PD:
Incident/Complaint#: 50-18-19923
Date/Time: Sunday, June 17th, 2018 at approximately 6:30AM
Location: Firefly Camping Lot 18, Dover International Speedway, 1131 N. DuPont
Hwy, Dover, DE
Narrative:
The Dover Police Department is investigating the death of a 20-year-old woman that
occurred on Sunday morning. At approximately 6:30AM, officers were alerted to an
unresponsive female in Firefly Camping Lot 18 at Dover International Speedway. Upon
arrival, officers observed that Caroline Friedman from Philadelphia, PA was unconscious
at her campsite. Friedman was treated on scene by medical staff and transported to
Bayhealth Kent General Hospital where she was pronounced deceased at 6:55AM.
Friedman was an attendee of the 2018 Firefly Music Festival being hosted at Dover
International Speedway.
The cause of Friedman’s death is unknown, but is not believed to be the result of foul
play. An official cause of death is dependent upon autopsy and toxicology results.
9
Página 105
2018 Dover Police Department Firefly Music Festival After Action Report 7/18/2018
Incident/Complaint#: 50-18-19763
Date/Time: Saturday, June 16th, 2018
Location: Firefly Music Festival, Dover International Speedway, 1131 N. DuPont Hwy,
Dover, DE
Officer Releasing Information: M/Cpl. Mark Hoffman, Public Information Officer
Narrative:
Throughout Friday night (June 15th) and into the early morning hours of Saturday, June
16th, the Dover Police Department was notified of several cell phone thefts as the result
of pick pocket suspects being in the large crowds. One victim who had her phone taken
was able to track the phone using the “Find my iPhone” app. Officers from the Dover
and Delaware State Police Departments were able to track the phone to William
Rodriguez (34) and took him into custody. Rodriguez was found to be in possession of
27 cell phones at the time, including the victim’s phone that was left on and was able to
be tracked. Rodriguez has been charged with three counts of theft under $1,500 with
additional charges pending. Investigating officers are working to identify owners of the
remaining phones and contact their owners. A total of 20 charges were placed on the
subject after investigation was completed.
Rodriguez, who is from Miami, FL, was committed to JTVCC in default of $3,000 cash
bond.
The following are major drug arrests made by DVOC:
On June 15, 2018 members of the Dover Police Departments Drugs Vice and Organized
Crime Unit and Street Crimes Unit were conducting an undercover drug investigation in
the Firefly Music Festival Camp Grounds, specifically Dover Downs, 1131 North Dupont
Highway, Lot 2, Dover, Delaware.
Shakir Styles did Deliver 3 Amphetamine Pills to an Undercover Police Officer while
inside of Lot 2.
During the arrest, Shakir Styles resisted arrest and while being forcefully arrested Styles
did manage to get rid of a fanny pack containing several more Amphetamine Pills when
he threw it and a bystander picked it up.
- 3 Amphetamine Pills
- 7 Marijuana Cigarettes/6.5 grams of Marijuana
Shakir Styles was charged with the following criminal offenses:
- Delivery of Amphetamine Pills
- Possession With Intent to Deliver Marijuana
10
Página 106
2018 Dover Police Department Firefly Music Festival After Action Report 7/18/2018
- Tampering With Physical Evidence
- Resisting Arrest
- Possession of Drug Paraphernalia
Shakir Styles was also wanted out of Alexandria VA for Probation Violation for Drug
Dealing but Extradition was denied.
On June 14, 2018, members of the Dover Police Departments Drugs, Vice and Organized
Crime Unit and Street Crimes Unit were conducting undercover operations inside of
Firefly Music Festival Lot 2 Camp Grounds, Dover Downs, 1131 North Dupont
Highway, Dover, Delaware.
Undercover Officers observed a black male later identified as Hassan Mceachin selling
counterfeit tee shirts inside of the Lot 2 Dover Downs Camp Ground. Officers attempted
to contact Mceachin in reference to the offenses observed when he fled on foot through
the camp ground until he was finally taken into custody. During the foot pursuit and
struggle taking Mceachin into custody, a Dover Police Officer suffered injuries to his left
arm.
Mceachin was found in possession of the following:
- 37 counterfeit Dover Downs Firefly Music Festival shirts
- $850.00 United States Currency/Counterfeit Shirt Proceeds
- .1 grams of Marijuana
- Marijuana Grinder
Hassan Mceachin was charged with the following crimes:
- Assault 2nd
- Trademark Counterfeiting
- Resisting with Force or Violence
- Possession of Marijuana
- Possession of Drug Paraphernalia
On 6/16/18 the Dover Police Departments Drug, Vice and Organized Crime Unit
concluded a drug investigation with the arrest of Def-Parris Hearn. The DVOC unit was
investigating Hearn for drug dealing at the Firefly Music Festival at Dover Downs. Hearn
was taken into custody and found in possession of 200 doses of LSD. Hearn was charged
with the below offenses and later arraigned at JP7. Bond information was not known at
the time of this release.
-Pos. with intent to deliver LSD
-Pos. LSD in a Tier 3 quantity
11
Página 107
2018 Dover Police Department Firefly Music Festival After Action Report 7/18/2018
On June 15, 2018 members of the Dover Police Departments Drugs Vice and Organized
Crime Unit and Street Crimes Unit were conducting an undercover drug investigation in
the Firefly Music Festival Camp Grounds, specifically Dover Downs, 1131 North Dupont
Highway, Lot 2, Dover, Delaware.
Zachary Williams and Edward Hartmann did deliver 1.4 grams of MDMA/Ecstasy to an
Undercover Police Officer while inside of Lot 2.
Following the arrest a search of Zachary Williams and Edward Hartmann, Officers
searched them and their vehicle locating the following:
- 33 grams of MDMA
- 4.6 grams Cocaine
- 1.1 grams Marijuana
- Digital Scale
Zachary Williams was charged with the following criminal offenses:
- Delivery of MDMA/Ecstasy
- Possession Tier 5 MDMA/Ecstasy
- Possession With Intent to Deliver MDMA/Ecstasy
- Possession With Intent to Deliver Cocaine
- Conspiracy 2nd
- Possession of Marijuana
- Possession of Drug Paraphernalia
Edward Hartmann was charged with the following criminal offenses:
- Delivery of MDMA/Ecstasy
- Possession Tier 5 MDMA/Ecstasy
- Possession With Intent to Deliver MDMA/Ecstasy
- Possession With Intent to Deliver Cocaine
- Conspiracy 2nd
- Possession of Marijuana
- Possession of Drug Paraphernalia
On 6/16/18 the Dover Police Departments Drug, Vice and Organized Crime Unit
concluded a drug investigation with the arrest of Def-Andrew Arbieto. The DVOC unit
was investigating Arbieto for drug dealing at the Firefly Music Festival at Dover Downs.
Arbieto was taken into custody after selling an amount of Mushrooms and LSD to an
undercover police officer. After being taken into custody Arbieto was found in
possession of a total of 32 grams of Psilocybin Mushrooms and 30 doses of LSD.
Arbieto was charged with the below offenses and later arraigned at JP7. Bond
information was not known at the time of this release.
12
Página 108
2018 Dover Police Department Firefly Music Festival After Action Report 7/18/2018
-Pos. with intent to deliver LSD
-Delivery LSD
-Pos. with intent to deliver Psilocybin Mushrooms
-Delivery of Psilocybin Mushrooms
-Drug paraphernalia
-Pos. of Tier 1 LSD
-Pos. of ammunition by person prohibited
-Carrying a concealed dangerous instrument
11. ITEMS REQUIRING IMPROVEMENT:
At the conclusion of the Firefly Music Festival, it was determined that there were several
issues that needed to be addressed, dealt with and corrected for the 2019 Firefly Festival.
Some of the issues that arose during the weekend which will be addressed in the
upcoming meetings are as follows:
On Saturday there was an issue during the day where the festival entrance
scanners went off-line and caused major back up of people waiting to get in. This
eventually led to patrons pushing past the barriers on the bridge and front gate.
Better communication from festival workers to JOC when issues arise that could
lead to significant delays will help curb this issue in future.
Restriction on Motorcycles crossing the bridge while the bridge was open to carts
only. This was corrected on Saturday to allow the proper access. It is
recommended that motors have bridge access during the entire event when carts
have access.
Communications within the festival itself particularly while a performance is on-
going was severely hindered by the extreme sound levels. The location of the
microphone mount on our Event Uniform is ill positioned and the audio is
broadcast away from officers by design. Officers cannot hear any broadcasts
while a large performance is on-going unless the microphone is held directly to
one’s ear now tying up one hand which obviously in an emergency situation is
going to cause an issue. The mics are equipped with a 3.5mm port to allow for an
earpiece which would assist officers in the festival to ensure they hear all
emergency and non-emergency broadcasts which would greatly improve
communications.
Officers encountered numerous patrons who needed direction on where certain
more important locations were. Depending on where officers were located at the
time, it was difficult to say where these things were located or officers could only
provide them a general direction to head because the location may have been
quite a ways away (possibly leaving them lost again after they got part way
there). After the first day of the festival, the paper maps were all, nonexistent and
13
Página 109
2018 Dover Police Department Firefly Music Festival After Action Report 7/18/2018
numerous people weren't carrying cell phones to use the app (or they didn't want
to download it on their phone). The posting of more signs to provide direction
would have been helpful. Examples of these important locations would be
bathrooms, lost and found, water station, and the charging locations.
Dispatchers - It would be advantageous to know the schedule of events and the
number of people expected to attend well in advance, so the 911 manager can
plan the dispatcher’s schedules accordingly.
12. CONCLUSION:
There were 3482 of man hours managed by Dover PD (627 hours Municipal agencies)
and 3275 hours managed by the Delaware State Police. Considering the size of the event,
from the Dover Police public safety standpoint, the 2018 Firefly Music Festival did not
have any major issues. The communication and understanding of everyone’s role during
this festival has improved every year and as a result the overall day to day operations and
safety of the event has improved. Planning for the 2019 Firefly Festival will be
beginning soon. AEG has bought out Red Frog Events and is the sole owner of Firefly
moving forward.
Firefly for 2019 is Thursday June 20, 2019 – Sunday June 23, 2019
14
Página 113
Level Requested as supported by 911 Data: 1 24 hours a day 7 days a week and 1 – 16 hours a day 7 days
a week which covers our peak time 7am - 11pm
Gem Ambulance Mid Atlantic Prime Care St. Francis EMS
1- 24 /day 7 days/week 2 – 24/days 7 days/week 1- 24 /day 7 days/week 2 – 24/days 7 days/week
1 – 16 hrs day/ 7 days a 1 – 16 hrs day/ 7 days a 1 – 12 hrs/day – 7
week week days/week
All of the vendors except for PrimeCare require a transition period.
Mutual Aid: Concern over difference in staffing.
According to data from Kent County 911 Center the times where our current vendor was not available was
due to being on scene at another incident or delayed at the hospital.
Our new reporting requirement is going to capture the amount of time it is taking to release the EMS Staff
from the local hospital so we can work with them with true data to hopefully reduce the times where we will
need to utilize mutual aid. This would likely not decrease the amount of mutual aid that Dover EMS provides
to our neighbors when needed.
Página 118
Description Charge
Ambulance Mileage – Ground $45/mile
Ambulance ALS Level 1 - Non Emergency $1,053
Ambulance ALS Level 1 - Emergency $2,178
Ambulance BLS Non Emergency $992
Ambulance BLS Emergency $1882
Ambulance Specialty Care Transport $2,581
In cases where the patient is responsible for payment, as per
contract, the patient will be billed in the amount of $250 per
transport
Página 119
Vendors At a Glance
Vendor GEM Ambulance Mid Atlantic Prime Care St. Francis EMS
3 year contract $472,875 $909,000 $700,800 $600,000
$612,000
Annual Costs Year 1: 150,000 Year 1: 291,000 Option 1: 233,600 Year 1: 200,000
Year 2: 157,500 Year 2: 303,000 Option 2: 204,000 Year 2: 200,000
Year 3: 165,375 Year 3: 315,000 Year 3: 200,000
Submission Yes No Yes Yes
Complete?
Patient Fees $150 Did not submit $125 $250
Minority Preference No Yes Yes No
(3 yr reduction (3 yr reduction
10,000) 7,008 / 6,120)
Total Scores 806 456 841 779
Average Total 201.5 114 210.25 194.75
Average Individual 8.39 4.75 8.76 8.11
Score
Página 120
City of Dover
2018 Transportation Projects Priorities Letter Draft #2
To: Safety Advisory and Transportation Committee
From: David S. Hugg III, Director, Planning & Inspections and Dawn Melson‐Williams, Principal
Planner
Thru: Donna S. Mitchell, City Manager
Date: August 21, 2018
Subj: 2018 Transportation Priorities
Each year the City Council develops priorities for road improvements to be forwarded to the Secretary
of Transportation and the Dover/Kent MPO for consideration in the department’s Capital Transportation
Plan (CTP). The priorities below reflect current development patterns and the recommendations of
related studies and plans, such as the Dover Bicycle Plan and Pedestrian Plan and the Delaware Route 8
Concept Plan and Operations Study. Projects have been re‐prioritized as appropriate. Ranking in the
proposed FY19 to FY24 CTP has been noted for informational purposes.
1. Garrison Oak Connector Road – this project was moved down in the priority list last year
reflecting completion of a June 2017 study (Garrison Oak Traffic Study) that indicated that road
is not justified at this time, based on the current uses and potential continued development in
the Garrison Oak Technical Park (GOTP). However, an alignment study to determine the
feasibility and location of a future road connection is justified as this is an important economic
development asset for the City and the County. Utilization of the GOTP is restricted by the lack
of good access to SR1. As additional development occurs in the park its priority for construction
will be revised as appropriate. It is not in the CTP. It is listed as a high priority project by the
Central Delaware Chamber of Commerce.
2. Loockerman Street/Forest Street Intersection – this project has been a priority of the City to
help spur redevelopment activities in the Downtown Development District while also improving
traffic circulation and safety. It was identified as an improvement needed through the Restoring
Central Dover Study and the West Side Redevelopment Study conducted in 2001. It is also
complementary to the recommendations of the Capital Gateway Study addressing the Forest
Street/Route 8 corridor. It would result in improved traffic circulation, a more pedestrian‐
friendlier zone at the railroad crossings and create a new “gateway” into the downtown. It is in
the CTP as priority #60.
3. Sidewalks within the walk zone of the new Dover High School – Dover High School is entering
another school year and critical gaps in the sidewalk system remain, including along Mifflin Road
and along Route 8 on the south side from Mifflin Road west. This project also addresses the
continuation of the Senator Bikeway and the recommendations from the Capital Gateway Study.
The City is very concerned about public safety in this area and believes it deserves to be
included in the CTP and funded at the earliest opportunity.
4. Crawford Carroll Avenue Extension – this project reflects the continuing growth of Delaware
State University, commercial development in the area, and future development possibilities
involving the Dover Mall and adjoining properties. It would provide access between the DSU
P. O. Box 475 Dover, DE 19903
Community Excellence Through Quality Service
Página 121
Learning and Living Commons facility and the main campus as an alternate to using US 13. The
2008 Comprehensive Development Plan identified the need to link educational facilities of Del
Tech and DSU. It is also linked to Priority 5 as part of a plan to improve access throughout the
US13 corridor and is associated with the Dover Mall north entrance realignment This project is
included in the CTP as priority #47.
5. West Street Improvements from North Street to the Transit Center ‐ this project is along the
western edge of the Downtown Development Distract and would improve traffic flow, safety
and access to the transit system serving the Downtown and the City, and an opportunity for
multi‐modal linkages to be established. West Street has become an important connection for
the DART Transit service in the city but has not been improved to reflect to standards to meet
this use. Part of these improvements were achieved with the completion of bike/ped pathways.
It is in the CTP as Priority #71.
6. US 13 Service Roads/Scarborough Road – this project would create a service road parallel to US
13 from Leipsic Road to Scarborough Road, and a set of local access roads providing economic
benefits to the Dover Mall and proposed adjacent commercial complex, the Dover Mall Power
Center project concept. This project is in the CTP as SR 1/Scarborough Road C‐D roads at priority
#100 and is part of the US Route 13 Circulation Study. It is listed as a high priority by the Central
Delaware Chamber of Commerce.
7. College Road Corridor Upgrades (Kenton Road to McKee Road) – this project in in the CTP as
priority #77 and includes road improvements and sidewalks in this heavily traveled corridor. It is
a key east‐west linkage of northwest residential areas to commercial corridors and DSU. Recent
development in this area includes apartments and a rehabilitation hospital near the College
Road/McKee Road Intersection.
8. US 13 Sidewalk Construction – construction of multi‐use paths along US 13 continues to be a
priority. Construction of sidewalks is required when properties are developed or redeveloped,
but significant sections of the sidewalk system are either in deteriorated condition or missing
(Public Safety Boulevard to Puncheon Run Connector, for example). This project is not in the
CTP.
9. Route 8/Hazelettville Road Connector – this is a north/south access road that was identified in
the Route 8 Concept Plan and Operations Study. This connection will encourage economic
development and provide transportation alternatives in this heavily traveled corridor. This
project is in the CTP as priority #54.
10. Kenton Road Corridor Upgrades/ Route 8 East/West Corridor Plan Improvements – this project
includes road improvements and sidewalks to improve traffic flow and bicycle/pedestrian
safety. It is critical to improving the approach to the City from the northwest where new
residential areas within and outside the City are being built. This segment also lacks sidewalks.
the Route 8 Corridor Study identified several improvements along the Route 8 corridor that
would improve safety, better manage access, reduce congestion and provide improved traffic
flow. While improvements complementary to this corridor (POW‐MIA Parkway and Senator
Bikeway, for example) address north/south movements, continued development on the west
side of the City impact the capacity and operation of this roadway. This project is in the CTP as
priority 70. It is listed as a high priority by the Central Delaware Chamber of Commerce.
Página 122
11. Kings Highway/Route 13 Intersection Improvements – The intersection of Kings Highway/
White Oak Road and US 13 needs improvements to meet an acceptable level of service.
Extensive new commercial development (Capital Station Shopping Center and other commercial
facilities) are being constructed or are planned south of the intersection which will add traffic
and access burdens on these roads. The intersection project is not in the CTP.
In addition to these projects, the City is also in support of implementation of the Bicycle and Pedestrian
Plans developed by the Dover/Kent MPO and approved by the City Council in 2016. We appreciate
DelDOT’ s active participation in construction of segments of the Capital City Trail and Senator Bikeway.
We look forward to discussing these priorities with the MPO soon.