Ir al contenido principal
AskDover

Esta página fue traducida por inteligencia artificial. No la ha revisado ninguna persona y puede contener errores. Ver la versión en inglés

Anexo

Parks, Recreation, and Community Enhancement Committee. 10 de septiembre de 2012.

Abrir el PDF

Este texto se extrajo de el PDF de forma automática y puede contener errores. El PDF es el registro oficial, así que consúltelo antes de confiar en esto.

9 páginas tienen poco o ningún texto legible aquí, a menudo por ser escaneos o dibujos. Para verlas, consulte el PDF.

Página 1

PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE AGENDA SEPTEMBER 10, 2012 - 12:00 NOON CITY HALL CONFERENCE ROOM 15 LOOCKERMAN PLAZA DOVER, DELAWARE Public comments are welcomed on any item and will be permitted at appropriate times. When possible, please notify the City Clerk (736-7008 or e-mail at CityClerk@dover.de.us) should you wish to be recognized. AGENDA ADDITIONS/DELETIONS 1. Presentations A. Restoration and Remediation of Mirror Lake - Rick Greene, Department of Natural Resources and Environmental Control (DNREC) B. Overview of City of Dover Recreation Programs 2. Updates A. Planning and Funding for New Library B. CDBG Program /tm S:\AGENDAS-MINUTES-PACKETS\Committee-Agendas\2012\09-10-2012 PR&CE.wpd THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.

Página 2

September 10, 2012

Página 3

 Remediate contaminated sediments  Restore/enhance habitat & ecological function  Provide a comprehensive and long-term solution

Página 4

 Limited ecological “services and functions”  Sandbar/sedimentation  Canada geese  Invasive plants  Eroding banks  Stormwater Impacts (parking lots & other paved areas)

Página 5

 Fish, sediment and surface water within the St. Jones River and Mirror Lake are contaminated with PCBs, mercury and other pollutants  Fish advisory first issued in 1988 to reduce public exposure  Concentrations falling, but very slowly. Why?

Página 6

 PCB & Hg in fish depend on concentrations in the sediment  Sediments act like a capacitor which release contamination to water  PCBs & Hg very persistent  Decades predicted for conc of PCB in Mirror Lake sediments to drop to point that fish OK to eat

Página 7

R R : A. Do nothing and wait it out  No cost but fails to address habitat or contaminant problems. Long wait (~74 years) on contaminants . B. Dredge  Several downsides for this option. C. Cap it  Medium costs, contaminants remain & may still diffuse through cap. Can be integrated with habitat restoration. D. “Sequester” it in Place  Contaminants remain but bioavailability & bioaccumulation greatly reduced, hereby cutting eco & human health risks; Half the cost of dredging. Also, this approach can be integrated with habitat restoration. This is DNREC’s preferred option.

Página 8

 Not needed to support navigation/commerce, recreation, or education.  Will not enhance habitat or ecological functions  Expensive (~$1.5 M). Contaminants in sediments likely to drive up disposal costs even further.  Worst of contamination is deeper down in sediments. Dredging will release some of that contamination.  Not a permanent solution to “sand bar” problem. Sandbar will reform over time.  Very low likelihood of being permitted. Non-starter.

Página 9

 DNREC staff contacted Dr. Upal Ghosh, UMBC, in summer of 2011 to explore feasibility of carbon treatment of Mirror Lake & downstream channel  Mirror Lake considered good candidate  Proposal developed and circulated internally within DNREC with great interest  Expected Reduction of contaminant bioavailability: 70 – 90% or better in 5 years or less

Página 10

Has strong sorption properties that act to bind contaminants, making them less available to the food chain

Página 11

 Involves incorporating activated carbon directly into sediments to bind the contamination and reduce bioavailability. How it works: bioaccumulation reduced bioaccumulation new sediment=barrier

Página 12

Proposed remediation area for carbon sequestration

Página 13

 Optimum time is November  Lower risk of hurricanes and frontal storms; also base flow still low  Avoids fish spawning runs; also recreational fishing winding down • Draw down Silver Lake as temporary buffer • Install Portadam & dewater Mirror Lake w/ high capacity pumps

Página 14

 For fully dewatered areas: broadcast and till in immediately  For wet areas: shoot in pellets with “hydroseeder”-type device or potentially apply by helicopter

Página 15

Bottom Contour of Mirror Lake

Página 17

Emergent wetlands will Channel be increased will remain in size.

Página 21

HERBACEOUS PLANTS Sweet flag Water plantain Fox sedge Blue flag iris Swamp sunflower Soft rush Arrow arum Torrey's rush Black needle rush

Página 22

Pickerel weed Green bulrush Lizards tail Duck potato Common three-square Woolgrass American white water lilly Soft stem bulrush

Página 23

 Fish contamination & toxicity to benthic aquatic life reduced significantly; fish advisories lifted/lessened sooner.  Unsightly sandbar will be converted to attractive intertidal wetland, beautifying the gateway to historic Dover.  Wetland plantings will enhance biodiversity & ecological function of Mirror Lake. They’ll also take up nutrients.  Canada goose & invasive plant problem reduced.  Increased recreational usage & enjoyment.  Innovation will be recognized & implemented elsewhere.

Página 24

 Estimated Cost = $0.75 million (includes planning, design, construction, and monitoring)  $0.68 million secured from State HSCA program  $63K also secured from DNREC to develop plans & specs  No costs to prepare Fed & State permit applications (will be done in-house by DNREC)  Labor for much of construction from DNREC & Conservation District. Some labor from City of Dover would be very helpful.

Página 26

 Enthusiasm & overall support for the project  Access/staging agreement  Draw down Silver Lake prior to dewatering (careful!)  Labor:  Lift truck to help unload & load Portadam frames  2 people to help set up & tear down the frames  Plantings

Página 27

Task Timing Project Proposal Complete – 5/2012 Artist’s Renderings Complete – 5/2012 Community Input & Support Ongoing – Initiated Spring 2012 Plans & Specs Target Completion – 1/2013 Secure Permits Target Completion – 5/2013 Baseline Monitoring (water, sed & fish) Target Completion – Summer /Fall 2013 Construction Nov through Dec 2013 Post-construction Monitoring Nov 2014 and Nov 2015 Reporting Various

Página 28

Scott Koening Silver Lake Commission, esp. Dean Holden City of Dover Parks & Rec  Upal Ghosh, UMBC  Mark Biddle  Frank Piorko  Chuck Williams  Marj Crofts  Dave McQuaide & Robin Tyler  Steve Williams  Lara Allison  Lyle Jones  John Schneider  Brittany Sturgis  Stew Michels & Cathy Martin  John Cargill  Bob Enright  Melanie Tymes  Virgil Holmes  Steve Wright  Ed Bonner, USACE

Página 29

Ghosh, U. and Greene, R. 2012. In-situ Treatment of Mirror Lake Sediments to Reduce Uptake of Pollutants in the Food Chain. Proposal. Greene, R. Saint Jones & Mirror Lake PCB Time Response without Carbon Treatment. Delaware Department of Natural Resources and Environmental Control, Dover, DE. Greene, R. 2012. Managing Water During the Mirror Lake Restoration and Remediation Project. Delaware Department of Natural Resources and Environmental Control, Dover, DE.

Página 30

Status of FY-11 CDBG Projects U Monthly statistics for the month of August 2012 CDBG FY11 Projects Homeownership Assistance Program Eight families have purchased homes using the Dover First Start Program. Homeowner Rehabilitation Program Three homes have been completed. Dover Interfaith Mission to the Homeless CDBG funds have been utilized to cover the operations cost for the shelter. Emergency Home Repair Project Emergency repairs have been completed on 15 properties in the City of Dover. Connections Community Support Program Motel vouchers have been provided to 18 homeless persons in the City of Dover. Neighborhood Stabilization Program (NSP) The city was awarded $1,426,740 for the acquisition and rehab of foreclosed properties to be sold to qualifying families. A total of $1,277,993 has been expended on the acquisition and renovations for 9 properties. The remaining balance of $148,747 will be utilized for renovations and acquisition. Six properties have been sold, two are for sale, and one is a rental that serves persons with disabilities. Habitat has purchased a property and is currently under renovation. 218 Ann Avenue (sold) 337 N. Governors Avenue (sold) 343 Mimosa Avenue (sold) 254 Green Blade Drive (sold) 907 Woodcrest Avenue (sold) 302 Stone Brook Place (for sale) 1430 S. Hancock (group home rental) 11 Westover Drive (sold) 1415 S. Hancock (for sale) 110 Thames Drive (under renovation)

Página 31

Parks, Recreation, and Community Enhancement 9/10/2012 Status of FY-11 Program Funds Spent - Fiscal Year 7/1/11- 6/30/12 2011 Grant Projects Project Details Total Grant Funds Expended Unencumbered Balance Eight families have Homeownership Assistance Program purchased homes in the $58,167 $58,167 $0 FY10 & 11 City of Dover *Housing Rehabilitation Program FY10completed $25,275 $25,275 $0 Funding for utility and Dover Interfaith Mission to Homeless $34,479 $28,502 $5,977 lease cost 18 motel vouchers for Connections Comm. Support $5,000 $5,000 $0 homeless provided Emergency home repairs RC & D $38,000 $38,000 $0 completed on 15 homes Housing Rehabilitation Program 3 homes completed $38,000 $36,219 $1,781 Total $198,921 $191,163 $7,758 *rehab projects - please note that $25,275 has been rolled over to program year FY-11 806 Forest Street completed 122 Davis Circle 839 Paul Street completed