This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
9 pages have little or no readable text here, often scans or drawings. See the PDF for those.
Page 1
PARKS, RECREATION, AND COMMUNITY
ENHANCEMENT COMMITTEE
AGENDA
SEPTEMBER 10, 2012 - 12:00 NOON
CITY HALL CONFERENCE ROOM
15 LOOCKERMAN PLAZA
DOVER, DELAWARE
Public comments are welcomed on any item and will be permitted at appropriate
times. When possible, please notify the City Clerk (736-7008 or e-mail at
CityClerk@dover.de.us) should you wish to be recognized.
AGENDA ADDITIONS/DELETIONS
1. Presentations
A. Restoration and Remediation of Mirror Lake - Rick Greene, Department of Natural
Resources and Environmental Control (DNREC)
B. Overview of City of Dover Recreation Programs
2. Updates
A. Planning and Funding for New Library
B. CDBG Program
/tm
S:\AGENDAS-MINUTES-PACKETS\Committee-Agendas\2012\09-10-2012 PR&CE.wpd
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. THIS AGENDA IS SUBJECT TO CHANGE TO
INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS.
Page 2
September 10, 2012
Page 3
Remediate contaminated sediments
Restore/enhance habitat & ecological function
Provide a comprehensive and long-term solution
Page 4
Limited ecological “services and functions”
Sandbar/sedimentation
Canada geese
Invasive plants
Eroding banks
Stormwater Impacts (parking lots & other paved
areas)
Page 5
Fish, sediment and surface water within the St. Jones
River and Mirror Lake are contaminated with PCBs,
mercury and other pollutants
Fish advisory first issued in 1988 to reduce public exposure
Concentrations falling, but very slowly. Why?
Page 6
PCB & Hg in fish depend
on concentrations in the
sediment
Sediments act like a
capacitor which release
contamination to water
PCBs & Hg very persistent
Decades predicted for conc
of PCB in Mirror Lake
sediments to drop to point
that fish OK to eat
Page 7
R R :
A. Do nothing and wait it out
No cost but fails to address habitat or contaminant problems. Long
wait (~74 years) on contaminants .
B. Dredge
Several downsides for this option.
C. Cap it
Medium costs, contaminants remain & may still diffuse through cap.
Can be integrated with habitat restoration.
D. “Sequester” it in Place
Contaminants remain but bioavailability & bioaccumulation greatly
reduced, hereby cutting eco & human health risks; Half the cost of
dredging. Also, this approach can be integrated with habitat
restoration. This is DNREC’s preferred option.
Page 8
Not needed to support navigation/commerce, recreation,
or education.
Will not enhance habitat or ecological functions
Expensive (~$1.5 M). Contaminants in sediments likely to
drive up disposal costs even further.
Worst of contamination is deeper down in sediments.
Dredging will release some of that contamination.
Not a permanent solution to “sand bar” problem. Sandbar
will reform over time.
Very low likelihood of being permitted. Non-starter.
Page 9
DNREC staff contacted Dr. Upal Ghosh, UMBC, in
summer of 2011 to explore feasibility of carbon
treatment of Mirror Lake & downstream channel
Mirror Lake considered good candidate
Proposal developed and circulated internally within
DNREC with great interest
Expected Reduction of contaminant bioavailability:
70 – 90% or better in 5 years or less
Page 10
Has strong sorption
properties that act to
bind contaminants,
making them less
available to the food
chain
Page 11
Involves incorporating activated carbon directly into sediments to bind
the contamination and reduce bioavailability.
How it works:
bioaccumulation reduced bioaccumulation new sediment=barrier
Page 12
Proposed
remediation
area for
carbon
sequestration
Page 13
Optimum time is November
Lower risk of hurricanes and frontal storms; also base flow still low
Avoids fish spawning runs; also recreational fishing winding down
• Draw down Silver Lake as temporary buffer
• Install Portadam & dewater Mirror Lake w/ high capacity
pumps
Page 14
For fully dewatered areas: broadcast and till in immediately
For wet areas: shoot in pellets with “hydroseeder”-type device or
potentially apply by helicopter
Page 15
Bottom Contour of Mirror Lake
Page 17
Emergent
wetlands will Channel
be increased will remain
in size.
Page 21
HERBACEOUS PLANTS
Sweet flag Water plantain Fox sedge
Blue flag iris
Swamp sunflower
Soft rush
Arrow arum
Torrey's rush Black needle rush
Page 22
Pickerel weed
Green bulrush
Lizards tail Duck potato
Common three-square
Woolgrass
American white water lilly
Soft stem bulrush
Page 23
Fish contamination & toxicity to benthic aquatic life reduced
significantly; fish advisories lifted/lessened sooner.
Unsightly sandbar will be converted to attractive intertidal
wetland, beautifying the gateway to historic Dover.
Wetland plantings will enhance biodiversity & ecological
function of Mirror Lake. They’ll also take up nutrients.
Canada goose & invasive plant problem reduced.
Increased recreational usage & enjoyment.
Innovation will be recognized & implemented elsewhere.
Page 24
Estimated Cost = $0.75 million (includes planning,
design, construction, and monitoring)
$0.68 million secured from State HSCA program
$63K also secured from DNREC to develop plans &
specs
No costs to prepare Fed & State permit applications
(will be done in-house by DNREC)
Labor for much of construction from DNREC &
Conservation District. Some labor from City of Dover
would be very helpful.
Page 26
Enthusiasm & overall support for the project
Access/staging agreement
Draw down Silver Lake prior to dewatering (careful!)
Labor:
Lift truck to help unload & load Portadam frames
2 people to help set up & tear down the frames
Plantings
Page 27
Task Timing
Project Proposal Complete – 5/2012
Artist’s Renderings Complete – 5/2012
Community Input & Support Ongoing – Initiated Spring 2012
Plans & Specs Target Completion – 1/2013
Secure Permits Target Completion – 5/2013
Baseline Monitoring (water, sed & fish) Target Completion – Summer /Fall 2013
Construction Nov through Dec 2013
Post-construction Monitoring Nov 2014 and Nov 2015
Reporting Various
Page 28
Scott Koening
Silver Lake Commission, esp. Dean Holden
City of Dover Parks & Rec
Upal Ghosh, UMBC Mark Biddle
Frank Piorko Chuck Williams
Marj Crofts Dave McQuaide & Robin Tyler
Steve Williams Lara Allison
Lyle Jones John Schneider
Brittany Sturgis Stew Michels & Cathy Martin
John Cargill Bob Enright
Melanie Tymes Virgil Holmes
Steve Wright Ed Bonner, USACE
Page 29
Ghosh, U. and Greene, R. 2012. In-situ Treatment of Mirror Lake Sediments
to Reduce Uptake of Pollutants in the Food Chain. Proposal.
Greene, R. Saint Jones & Mirror Lake PCB Time Response without Carbon
Treatment. Delaware Department of Natural Resources and Environmental
Control, Dover, DE.
Greene, R. 2012. Managing Water During the Mirror Lake Restoration and
Remediation Project. Delaware Department of Natural Resources and
Environmental Control, Dover, DE.
Page 30
Status of FY-11 CDBG Projects
U
Monthly statistics for the month of August 2012
CDBG FY11 Projects
Homeownership Assistance Program
Eight families have purchased homes using the Dover First Start Program.
Homeowner Rehabilitation Program
Three homes have been completed.
Dover Interfaith Mission to the Homeless
CDBG funds have been utilized to cover the operations cost for the shelter.
Emergency Home Repair Project
Emergency repairs have been completed on 15 properties in the City of Dover.
Connections Community Support Program
Motel vouchers have been provided to 18 homeless persons in the City of Dover.
Neighborhood Stabilization Program (NSP)
The city was awarded $1,426,740 for the acquisition and rehab of foreclosed properties to be sold to
qualifying families. A total of $1,277,993 has been expended on the acquisition and renovations for
9 properties. The remaining balance of $148,747 will be utilized for renovations and acquisition.
Six properties have been sold, two are for sale, and one is a rental that serves persons with
disabilities. Habitat has purchased a property and is currently under renovation.
218 Ann Avenue (sold) 337 N. Governors Avenue (sold)
343 Mimosa Avenue (sold) 254 Green Blade Drive (sold)
907 Woodcrest Avenue (sold) 302 Stone Brook Place (for sale)
1430 S. Hancock (group home rental) 11 Westover Drive (sold)
1415 S. Hancock (for sale) 110 Thames Drive (under renovation)
Page 31
Parks, Recreation, and Community Enhancement 9/10/2012
Status of FY-11 Program Funds Spent - Fiscal Year 7/1/11- 6/30/12
2011 Grant Projects Project Details Total Grant Funds Expended Unencumbered Balance
Eight families have
Homeownership Assistance Program
purchased homes in the $58,167 $58,167 $0
FY10 & 11
City of Dover
*Housing Rehabilitation Program FY10completed $25,275 $25,275 $0
Funding for utility and
Dover Interfaith Mission to Homeless $34,479 $28,502 $5,977
lease cost
18 motel vouchers for
Connections Comm. Support $5,000 $5,000 $0
homeless provided
Emergency home repairs
RC & D $38,000 $38,000 $0
completed on 15 homes
Housing Rehabilitation Program 3 homes completed $38,000 $36,219 $1,781
Total $198,921 $191,163 $7,758
*rehab projects - please note that $25,275 has been rolled over to program year FY-11
806 Forest Street completed
122 Davis Circle
839 Paul Street completed