05-22-2025 - Special Council - Budget Review Packet
City Council Meetings. 20 de mayo de 2025.
Este texto se extrajo de el PDF de forma automática y puede contener errores. El PDF es el registro oficial, así que consúltelo antes de confiar en esto.
204 páginas tienen poco o ningún texto legible aquí, a menudo por ser escaneos o dibujos. Para verlas, consulte el PDF.
Página 1
CITY OF DOVER
DRAFT ANNUAL
OPERATING BUDGET
FOR FISCAL YEAR
JULY 1, 2025 - JUNE 30, 2026
“COMMUNITY EXCELLENCE THROUGH QUALITY
SERVICE”
Published by:
The City Manager’s Office
David S. Hugg, III, City Manager
Sharon J. Duca, P.E., Assistant City Manager
Página 2
THIS PAGE INTENTIONALLY LEFT BLANK
Página 3
CITY OF DOVER
VISION
The City of Dover is a place where people want to
live! Through the team effort of its elected officials,
employees, and citizens, Dover is a clean and safe
community with a future of balanced growth and
opportunity where all citizens are heard, enjoy a
high quality of life, and diversity is valued.
Página 4
THIS PAGE INTENTIONALLY LEFT BLANK
Página 5
Table of Contents
FY 2025 – 2026 Draft Annual Operating Budget
With 2026 – 2030 Capital Investment Plans
Section Page
Introduction
City Manager’s Letter……………………………………………………………………………….. 1
How To Use This Budget ………………………………………………………………………….. 5
Operational Structure……………………………………………………………………………….. 7
Budget Summary
Budget Process…………………………………………………………………………………………. 9
Financial Policies……………………………………………………………………………………… 18
Fund Summaries
All Funds Financial Summary……………………………………………………………………. 29
General Fund…………………………………………………………………………………………… 31
General Fund Projected Cost Per Capita……………………………………………………... 35
Sanitation Fund……………………………………………………………………………………….. 36
Water Fund……………………………………………………………………………………………… 38
Wastewater Fund……………………………………………………………………………………… 43
Electric Fund……………………………………………………………………………………………. 48
Property Tax Projection…………………………………………………………………………….. 53
Personnel Summary
Personnel Table………………………………………………………………………………………… 55
Personnel Cost Summary………………………………………………………………………….. 56
Overtime Trends -- FY23 Through FY26 Comparison..………………………………… 57
Strategic Requests......................................................……………………………………. 58
Página 6
Section Page
Capital Investment Plan
Total City Funding Source Summary………………………………………………………….. 63
General Fund
Funding Source Summary…………………………………………………………………………. 73
Projects By Department…………………………………………………………………………….. 74
Sanitation Fund
Funding Source Summary…………………………………………………………………………. 131
Projects By Department…………………………………………………………………………….. 132
Water Fund
Funding Source Summary…………………………………………………………………………. 137
Projects By Department…………………………………………………………………………….. 138
Wastewater
Funding Source Summary…………………………………………………………………………. 153
Projects By Department…………………………………………………………………………….. 154
Electric
Funding Source Summary…………………………………………………………………………. 169
Projects By Department…………………………………………………………………………….. 170
Debt Service
Debt Service Schedules
General Obligation Bonds…………………………………………………………………………. 200
Water, Wastewater & Electric Revenue Bonds…………………………………………….. 201
General
Operating Department & Division Summaries
ii
Página 7
Section Page
Mayor……………………………………………………………………………………………………… 207
City Council……………………………………………………………………………………………… 211
City Manager……………………………………………………………………………………………. 215
City Clerk…………………………………………………………………………………………………. 219
Central Services
Procurement & Inventory……………………………………………………………….. 224
Facilities Management……………………………………………………………………. 227
Fleet Maintenance………………………………………………………………………….. 229
Customer Service………………………………………………………………………………………. 231
Emergency Management & Communications………………………………………………. 235
Finance……………………………………………………………………………………………………. 239
Fire Department……………………………………………………………………………………….. 243
Human Resources…………………………………………………………………………………….. 247
Information Technologies………………………………………………………………………….. 251
Library…………………………………………………………………………………………………….. 255
Parks & Recreation……………………………………………………………………………………. 259
Grounds………………………………………………………………………………………… 246
Planning, Inspections & Community development
Planning……………………………………………………………………………………….. 266
Inspections & Permitting…………………………..……………………………………. 268
Code Enforcement…………………………………………………………………………. 270
Police………………………………………………………………………………………………………. 273
Public Works
Administration……………………………………………………………………………… 280
General Fund Engineering……………………………………………………………… 282
Streets………………….………………………………………………………………………. 284
iii
Página 8
Section Page
Stormwater………………………………………………………………………………………………. 287
Sanitation
Sanitation………………………………………………………………………………………………… 291
Public Utilities Water
Water Fund
Water Engineering………………………………………………………………………… 300
Water Maintenance……………………………………………………………………….. 302
Water Treatment plant…………………………………………………………………… 304
Public Utilities Wastewater
Wastewater Fund
Wastewater Engineering………………………………………………………………… 312
Wastewater Maintenance……………………………………………………………….. 314
Public Utilities Electric
Electric Fund
Engineering…………………………………………………………………………………… 320
Power Plant…………………………………………………………………………………… 322
Power Supply………………………………………………………………………………… 324
Electric Transmission & Distribution………………………………………………. 326
Administration……………………………………………………………………………… 328
Meter Reading………………………………………………………………………………. 330
System Operations…………………………………………………………………………. 332
Other Funds
Special Revenues……………………………………………………………………………………… 335
Municipal Street Aid………………………………………………………………………. 338
Electric Red Light Program…………………………………………………………….. 339
iv
Página 9
Section Page
Realty Transfer Tax……………………………………………………………………….. 340
Community Transportation……………………………………………………………. 341
Substance Abuse Prevention Program……………………………………………… 342
Library Grant………………………………………………………………………………… 343
Community Development Block Grants (CDBG)………………………………. 344
Police Grants…………………………………………………………………………………. 346
Lodging Tax………………………………………………………………………………….. 347
American Rescue Plan Act (ARPA)………………………………………………….. 348
Economic & Community Development…………………………………………….. 349
Ambulance Service………………………………………………………………………… 350
Internal Service Funds
Worker’s Compensation…………………………………………………………………. 351
v
Página 10
THIS PAGE INTENTIONALLY LEFT BLANK
vi
Página 11
INTRODUCTION THE FOLLOWING SUBSECTIONS ARE INCLUDED:
CITY MANAGER’S LETTER HOW TO USE THIS BUDGET OPERATIONAL STRUCTURE
Página 12
THIS PAGE INTENTIONALLY LEFT BLANK
Página 13
1
Página 14
2
Página 15
3
Página 16
4
Página 17
Introduction City of Dover
HOW TO USE THIS BUDGET
The City of Dover budget document is intended to provide concise and reliable information to readers (Dover's citizens, the public, and other governmental entities) about the City's policies, financial plan, and operations. It includes information on Dover's objectives and budget for Fiscal Year 2026.
At the front of the budget is a Table of Contents that will aid the reader in finding specific information quickly and provide a summary of the major topics. The budget is divided into 12 major sections: Introduction, Budget Summary, Fund Summaries, Personnel Summary, Capital Investments Plan, Debt Service, General, Sanitation, Public Utilities Water, Public Utilities Wastewater, Public Utilities Electric, and Other Funds. Highlights of each section are as follows:
INTRODUCTION
The City Manager's letter to Council contains an overview of the budget. It discusses goals of the budget and highlights important issues by major fund and division summaries. The Introduction also includes a section on the City operational structure.
BUDGET SUMMARY
In this section, all the funds are discussed in summary form. The Budget Summary begins by reviewing the budget process, calendar, amending the budget, budget procedures, capital investments plan and budget, budget policy guidelines, explanation of funds, budgetary basis of accounting and financial policies.
FUND SUMMARIES
A Fund Summary of each major fund which shows how revenues and expenditures are reported by fund, a self- balancing set of accounts designed to track specific revenues, and the uses of those revenues. Each fund's origin and purpose.
These explain and discuss, in more detail, the City's major funds and their contingencies. Funds presented in this section include: General Fund, General Capital Project Fund, Sanitation Fund, Sanitation Improvement and Extension Fund, Wastewater Fund, Wastewater Improvement and Extension Fund, Water Fund, Water Improvement and Extension Fund, Electric Revenue Fund, and Electric Improvement and Extension Fund.
PERSONNEL SUMMARY
This section provides a summary of the City’s personnel, overall personnel budget, overtime trends and strategic requests.
CAPITAL INVESTMENTS PLAN (CIP)
Readers can find information on criteria, guidelines, and summary information on revenue sources and uses in this section. Highlights of Dover's CIP are identified, and a description of each project funded for Fiscal Year 2026 is included.
DEBT SERVICE
In this section, readers get an overview of the City's debt and the charter information on the subject. The City’s Debt Policy is also included.
5
Página 18
Introduction City of Dover
GENERAL, SANITATION, WATER, WASTEWATER, and ELECTRIC
These sections of the budget are arranged by fund with the department listing beginning with Mayor, City Council, and City Manager. Thereafter, the departments are listed alphabetically within each fund. Departments are further categorized into divisions. Each department’s budget detail begins with a description of the department vision and an overview of major programs, objectives and measures, and strategic objectives and measures, along with any budget recommendations and notes, if appropriate.
OTHER FUNDS
Readers can find information on the City's other funds. These funds are usually internal service funds (cost sharing funds that serve the major funds), trust funds (funds held by the City in a trustee capacity) and agency funds (funds that account for assets held by the City as an agent for another outside agency).
Readers are encouraged to contact the City with any comments or questions they might have regarding the budget. Inquiries may be addressed to the City Manager, P.O. Box 475, Dover, DE 19903-0475 or by telephone at (302) 736-7005.
6
Página 19
Introduction City of Dover
OPERATIONAL STRUCTURE
Each operational fund is comprised of departments which are major organizational units of the City. Each department has overall management responsibility for one or more divisions. A line-item listing of expenses is included along with a personnel summary and organization charts by functions and staffing.
The operational structure is included as a cross reference to depict relationships among programs, organizational units, and funds. The operational units by fund are listed in the table below.
FUND DEPARTMENT DIVISION/PROGRAM
GENERAL FUND Mayor Dover Police Department Economic Development City Council Legislative, Policy, and Administration Fiduciary Community Interaction City Manager Budget Preparation Department Management Project Development City Clerk Administrative Support Codification Ombudsman Municipal Elections and Referenda Central Services Warehouse and Purchasing Facilities Management Fleet Maintenance Customer Services/ Customer Service Tax Office Billing Collections Appraisal and Assessment Administration Emergency Management & Emergency Preparedness Communications Fire Marshal Finance Treasury and Cash Management Financial Reporting Administration Payroll Debt Management Accounts Payable Internal Auditing Budgetary Controls Asset Management Fire Fire Suppression and Rescue Response Fire Communications Fire Prevention Human Resources Recruitment and Employment Employee Benefits Risk Management Employee and Labor Relations
7
Página 20
Introduction City of Dover
FUND DEPARTMENT DIVISION/PROGRAM
GENERAL FUND Information Technology Support Programming Administration Library Circulation/Reference Services Adult Services Youth Services Parks, Recreation & Grounds Parks and Park Management Grounds and Beautification Recreation Youth Intervention Program Planning, Inspections & Planning and Planning Services Community Development Property Maintenance Construction, Inspection, and Permit Administration Community Development Police Core Law Enforcement Operational Support Services Administrative Support Services Public Works Administration Streets Stormwater Water & Wastewater General Fund - Engineering & Inspection
SANITATION Public Works Sanitation
WATER FUND Water & Wastewater Water - Engineering & Inspection Water - Maintenance Water - Treatment Plant WASTEWATER FUND Water & Wastewater Wastewater - Engineering & Inspection Wastewater - Maintenance
ELECTRIC FUND Electric Administration
Transmission & Distribution
Engineering
System Operations & Energy Programs
Power Supply
Electric Generation
The budget includes other special funds which can be found in Other Funds.
8
Página 21
BUDGET SUMMARY THE FOLLOWING SUBSECTIONS ARE INCLUDED:
BUDGET PROCESS
CALENDARS
BUDGET PROCEDURES
FINANCIAL POLICIES
Página 22
THIS PAGE INTENTIONALLY LEFT BLANK
Página 23
Budget Summary City of Dover
BUDGET PROCESS
The budget process is conducted to comply with all charter mandates.
The City Charter mandates the following:
The City Manager shall prepare and submit to the Council a budget presenting a financial plan for conducting the affairs of the City for the ensuing fiscal year. The total of proposed expenditures shall not exceed the total of anticipated income.
The budget shall include the following information:
- •A detailed statement showing the expenses of conducting each department and office of the City for the current year and last preceding fiscal year
- •A detailed estimate of the expenses of conducting each department and office of the City for the ensuing fiscal year with reasons for the increases and decreases recommended
- •The amount of the debt of the City with a schedule of maturities of bond issues
- •A statement showing the amount required for interest in the City debt and for paying off any bonds maturing during the year and the amount required for the sinking fund
- •An itemized statement of all anticipated income of the City with a comparative statement of the amounts received by the City from each of the same or similar sources for the last preceding and current fiscal years
- •An estimate of the amount of money to be received from taxes
- •Other information as the City Manager may think desirable or as may be required by the Council
The Council shall, on or before the fourth Monday in June each year, adopt a budget for the succeeding fiscal year. The Council shall, as far as possible, adhere to the budget so adopted in the making of appropriations.
The preparation of the budget begins with the establishment of goals and parameters through the City Manager's office. In October, the City Manager’s office distributed comprehensive budget instructions to department heads.
The City of Dover's method of budgeting has evolved from concepts of many budgeting methods. A line-item form of budget is used to account for expenses and revenues. In recent years, the City has incorporated concepts of programmatic budgeting which focuses on programs performed. Programs are examined periodically for their relevance and effectiveness, a concept which comes from zero-based budgeting philosophy.
In February of 2025, budget line items for both the current budget and proposed budget were reviewed with department heads to determine if service levels were to be maintained, improved, or reduced. New projects for the Capital Investment Plan were reviewed at this time as well. Revenues were projected as accurately as possible, in order to set priorities for proposed expenditures.
The Council will review the proposed budget in l a te May . June 9, 2025 has been set for the Electric Fund Budg et Public Hearing. Public comments on the entire FY26 City Budget were also sought on this date. The budget is made available on the City of Dover website at https://www.cityofdover.com/public-documents.
According to the ordinance, the proposed budget must go through two readings. After the budget’s adoption, monthly financial reports are issued to monitor and control the budget during the fiscal year.
9
Página 24
Budget Summary City of Dover
FISCAL 2025-2026 (JULY 1, 2025 – JUNE 30, 2026)
Chronological BUDGET GUIDELINES REVENUES, EXPENSES & CIP PERSONNEL BUDGET SUMMARIES, ANALYTICS & FORECAST MODELS COUNCIL & COMMITTEE PRESENTATIONS 10/15/2024 Budget Memo, Instructions, & ‘Add Pay’ requests to be distributed Department’s Revenue & Expense Budget Preparation and entry into Munis (both Operating & 10/15/2024 CIP). Lockout will occur on 12/23/2024. .Submissions to Cent. Services by 10/25/24*; Inspections completed 11/29/24; Vehicle 10/25/2024* – inspections and recommendations completed; Submit to City Manager by 12/02/24. 11/29/2024
Price guides for computer related items, cell phones, copier maintenance, janitorial, HVAC, 10/31/2024 uniforms, vehicles, and life cycle replacements placed in the shared folder.
11/4/2024 Updated ‘Add Pay’ information due to City Manager’s Office.
Requests for headcount or personnel changes (reclassification/raise) due to Human Resources *11/12/2024 and City Manager’s Office. Personnel budget changes, including reclassifications, are reviewed by the City Manager, 11/20/2024 – Controller/Treasurer & Human Resources Director. Meetings held with Department Heads to 12/20/2024 discuss. Department’s Revenue & Expense Budget Preparation and entry into Munis *12/23/2024 *Lockout will occur on 12/23/2024.
*12/23/2024 *All CIP support documentation submitted to City Manager by 12/23/2024
1/6/2025 – City Manager, Controller/Treasurer & Human Resources review draft personnel budget. 1/17/2025
Department Narrative due; Complete personnel budget files; CMO to determine benefit *1/17/2025 rates; CMO enters personnel items into Munis.
1/31/25 Council workshop to review budget goals and objectives 1/27/25 – 2/14/25 Draft Budget Summaries & Forecast Models Prepared (based on FY25 data) 2/3/25 – 2 /28/25 Draft Budget Review meetings held with Department Heads 2/24/25 – 2/28/25 Draft Budget Summaries and historical trend review by City Manager & Controller 3/3/25 – 3/7/25 Revised Draft Budget & CIP prepared
5/19/25 – 6/13/25 Budget Communication Meetings with Commercial Customers, Department Heads & citizens
05/12/2025 Setting of Public Hearing – Electric Fund Budget 05/14/25 – 05/16/25 Preliminary Draft Budget to Council 05/20/25 – 05/22/25 Budget review meetings; Standing Committee Members invited 6/9/2025 Electric Public Hearing (Advertisement posted 10 days prior) & First Reading of Budget Ordinance 6/23/25 Second Reading of Budget Ordinance Bold with asterisk indicates deadline for Department Heads* 10
Página 25
Budget Summary City of Dover
AMENDING THE BUDGET
There are two ways of amending any individual budget. Although the budget is presented as a line-item budget, department heads are permitted to change the breakdown within the materials and supplies and administrative groups of accounts (52000, 53000) if the total budgeted for that department is not exceeded. Department heads are not authorized to re-appropriate salary (51000) or capital items (54000).
Through budget ordinance, the City Manager has the authority to make interdepartmental transfers of up to five percent if financial policies are adhered to.
Any re-budgeting of available fund balances must have the approval of the City Council.
BUDGET PROCEDURES
Budgets are prepared for the General Fund, Sanitation Fund, Sanitation Capital Projects Fund, Governmental Capital Projects Fund, Water Fund, Wastewater Fund, Water Capital Projects Fund, Wastewater Capital Projects Fund, Electric Revenue Fund, Electric Capital Projects Fund, and Special Revenue Funds.
The Governmental Capital Projects Fund is a section of the General Fund. This section is required by our financial policy. The separate budget for this fund covers the planning and control of only capital items for the General Fund. The Sanitation Capital Projects Fund covers the planning and control of capital items for those funds. The Water Capital Projects Fund, Wastewater Capital Projects Fund, and Electric Capital Projects Fund are sections of each utility enterprise. These sections are required by bond resolutions. Separate budgets for these funds cover the planning and control of only capital items of the utilities.
Estimated ending budgetary balances provide the balancing amount for each budget. Acceptable budgetary balance guidelines were established by Council. The General Fund should maintain a minimum reserve in the budget balance of at least eight percent and no greater than twelve percent of the current year’s operating revenues for the General Fund, excluding the carry-forward balance. Water and Wastewater Funds should maintain a minimum reserve in the budget balance of at least eight percent and no greater than seventeen percent of the current year’s operating revenues for each of the Water and Wastewater Funds, excluding the carry forward balance. The Electric Revenue Fund should maintain a minimum budget balance of at least twelve percent of the current year operating revenues for the Electric Revenue Fund, excluding the carry forward balance.
The City follows the practice of encumbrance accounting for the Governmental Fund types. Encumbrances represent commitments related to unperformed contracts for goods or services. The encumbrances outstanding at year ends are reported as reservations of fund balances and do not constitute expenditures or liabilities. The commitments will be honored during the subsequent year.
The City Council adopts the budget. The City Council also adopts revisions for major items throughout the year. The City Charter requires the City to adhere to the budget appropriations as adopted by City Council. Department managers may not amend the total department budget amounts. Budget ordinances give the City Council the authority to revise budget appropriations. Budget ordinances give the City Manager the authority to transfer amounts not exceeding five percent of the total departmental budget within departments and between departments within funds. This is the legal level of budgetary control. If expenditures exceed appropriations by less than five percent of the total department budget, no formal Council approval procedure is required by the City budget ordinance. However, the City Council reviews all departmental budget activity on a regular basis and must approve all over expenditures of appropriations or transfer of appropriated amounts. All unencumbered appropriations lapse at the end of the fiscal year.
11
Página 26
Budget Summary City of Dover
CAPITAL INVESTMENTS PLAN AND BUDGET
The Capital Investments Plan is a five-year plan for the purchase of property, equipment, and public improvements that are of a permanent nature. The City proposes a five-year Capital Investments Plan annually. The capital investments budget is a one-year appropriation of expenditures from the Capital Investments Plan and is normally funded from bond proceeds, grants, and operating funds. Capital expenditures are those which are not a current expense and have a period of usefulness of at least five years. Such items include projects requiring debt obligation, acquisitions or lease of land, purchase of major equipment or vehicles, construction of buildings or facilities, and major improvements.
CRITERIA
Capital outlays are major projects undertaken by the City that generally fit within one or more of the following categories:
All projects requiring debt obligation or borrowing
Any acquisition or lease of land
Purchase of major equipment and vehicles ordered in excess of $25,000 with a life expectancy of five years or more
Construction of new buildings or facilities including engineering, design, and other pre-construction costs with an estimated cost, in excess of $25,000
Major building improvements that are not routine expenses and that substantially enhance the value of a structure
Major equipment or furnishings required to furnish new buildings or other projects
Major projects that are generally not recurring on a "year in, year out" basis
Projects costing more than $1,000 but less than $25,000 are included in the operating budget (minor capital).
All vehicles requested for replacement were inspected by Fleet Maintenance staff. Each vehicle’s brake system, fuel system, suspension, steering mechanism, coupling devices, and operating systems were checked for condition and rated good, fair, or poor. Repair estimates were also included if any of the vehicle systems required maintenance. Any vehicles with a rating of good or fair were not replaced.
12
Página 27
Budget Summary City of Dover
BUDGET POLICY GUIDELINES
The City of Dover follows numerous policy guidelines when preparing the budget. The most significant guidelines follow:
The budget should be balanced with current revenues being equal to or greater than current expenditures/expenses. The following approaches are employed to balance the budget in order of priority: improve productivity, create new service fees, raise existing service fees based on the cost of services, eliminate programs, increase property taxes, and lastly, reduce or eliminate services.
The tax rate should be competitive with nearby cities and cities of comparable size. The rate should produce revenue adequate to pay for approved City services. Qualified senior citizens receive a $50,000 exemption from the assessed value.
The General Fund shall realize returns from the Enterprise Funds, excluding the Sanitation Fund. The returns should not sacrifice improvements to the utilities. The budget includes transfers of $10,000,000 from the Electric Fund and $1,00,000 each from the Wastewater and Water Funds for a total transfer from the Utility Funds to the General Fund of $12,000,000. This makes up a combined 23.2% of the General Fund revenues.
Contingency Funds shall be maintained in the General, Sanitation, Wastewater, Water, and Electric Funds. These contingencies should be adequate to handle unexpected expenditures/expenses. The General Fund will maintain an amount of at least $700,000. The Wastewater and Water Funds will maintain an amount of at least $250,000. The Electric Revenue Fund will maintain an amount of at least $750,000. The City may only use monies in the contingency funds in times of unforeseen emergency expenditures.
Investments made by the City will address safety, liquidity, and yield. Interest earned from investment of available funds will be distributed to funds according to ownership of the invested funds. The City’s investment policy authorizes investment of City funds in U.S. Government Securities, fully insured or fully collateralized Certificates of Deposit with federally insured institutions, the State investment pool, and Repurchase Agreements.
Utility rates are reviewed annually to ensure that they will generate revenues adequate to cover operating expenses, meet the legal requirements of bond covenants, and allow adequate capital replacement.
EXPLANATION OF FUNDS
The accounting policies of the City conform to generally accepted accounting principles as applicable to governments. The following is a summary of the more significant policies:
- •Basis of Presentation - Fund Accounting
The accounts of the City are organized based on funds and account groups, each of which is considered a separate accounting entity. The operations of each fund are accounted for with a separate set of self-balancing accounts that comprise its assets, liabilities, fund equity, revenues, and expenditures or expenses, as appropriate. Government resources are allocated to and accounted for in individual funds based upon the purposes for which they are to be spent and the means by which spending activities are controlled.
The City reports the following major governmental fund:
General Fund: The General Fund is the general operating fund of the City. It is used to account for all financial resources except those required to be accounted for in another fund.
The City reports the following major proprietary funds:
Sanitation Fund: This fund accounts for transactions related to sanitation services, including payment of fees for waste disposal.
Wastewater Fund: This fund accounts for transactions related to wastewater services, including the payment of fees to Kent County for the treatment of sewage.
13
Página 28
Budget Summary City of Dover
Water Fund: This fund accounts for transactions related to water services. The City also holds lease agreements with cell phone companies for equipment placed on City water towers.
Electric Revenue Fund: This fund incorporates all transactions related to the generation, transmission and distribution of electricity. The Energy Authority (TEA) is contracted to manage the City’s power procurement, and North American Energy Services (NAES) is contracted to operate and maintain Dover’s electric generators at the Van Sant unit.
The City reports the following non-major funds:
Internal Service Fund: The City has created one internal service fund to account for the activities related to self- insured Workers Compensation. Receipts are provided from contributions by the City’s five major funds. Expenses are related to payment of claims, premiums, and administration costs. Actuarial analyses are completed triennially to ensure enough reserves for claims for the Workers Compensation Fund.
Special Revenue Funds: These funds account for the proceeds of specific revenue sources that are legally restricted to expenditure for specified purposes. This includes the Ambulance Service Fund.
Fiduciary Funds: Fiduciary funds consist of trust and agency funds and are used to report assets held by the City in a trustee or agency capacity for others. These funds are, therefore, not available to support City programs.
The City is the trustee for the City’s two pension plans: the Police Pension Fund and the Employee General Pension Fund.
The City allocates the costs of certain governmental services to the costs of business-type activities (indirect expense allocation). These costs include allocated amounts of City management, centralized budgetary formulation and oversight, accounting financial reporting, information technology, payroll, procurement, contracting and oversight, investing and cash management, personnel services, etc. The allocations are charged to the business-type activities based on the use of these services. As a matter of policy, the costs of certain governmental functions are not allocated to business-type activities such as public safety, library, recreation, permitting, inspections, streets, community, and economic development.
Basis of Accounting Basis of accounting refers to when revenues and expenditures or expenses are recognized in the accounts and reported in the financial statements. Basis of accounting relates to the timing of the measurements made regardless of the measurement focus applied.
All Governmental Funds, Expendable Trusts, and Agency Funds are accounted for using the modified accrual basis of accounting. Their revenues are recognized when they become measurable and available as net current assets.
Revenues that are susceptible to accrual include property taxes and billable service charges. All other revenues are accounted for when they are received.
Property taxes are recognized in the fiscal period for which they are levied provided they are “available’ – i.e., they are collected in the current period or are expected to be collected soon enough thereafter to be used to pay liabilities of the current period. The City considers all revenues reported in the government funds to be available if the revenues are collected 60 days after year-end, except for trash collection, which has a 30-day collection period.
Expenditures are generally recognized under the modified accrual basis of accounting when the related fund liability is incurred. The exception to this general rule is principal and interest on general long-term debt which is recognized when due. Also, claims and judgments and compensated absences are recognized as expenditures to the extent they have matured. General capital asset acquisitions are reported as expenditures in governmental funds. Proceeds of general long-term debt and acquisitions under capital leases are reported as other financing sources.
The government-wide financial statements as well as all proprietary and fiduciary trust funds are accounted for using the accrual basis of accounting and the economic resources measurement focus. Their revenues are recognized when they are earned, and their expenses are recognized when they are incurred.
14
Página 29
Budget Summary City of Dover
BUDGETARY BASIS OF ACCOUNTING
The City prepares the budget for Governmental Fund types in which the expenditure is estimated based on liabilities for goods and services to be incurred during the fiscal year. Revenues for the General Fund are budgeted on a cash basis except for property taxes and billable services, which are on a modified accrual basis. Under the cash basis of budgeting transactions are recognized only when cash is received. Under modified accrual basis revenues are recorded when they are earned (whether cash is received at the time). The expenditure is accounted for when the purchase orders are issued. Encumbrances are established when purchase orders are issued and accounted for as a designation of fund balance at year-end. The budget is amended in the subsequent year for the outstanding encumbrances of the prior year.
Budgets for the Electric Revenue Fund, Water Fund, Wastewater Fund, Sanitation Fund, and Internal Service Fund are prepared on an accrual basis. Revenues are recorded when they are earned, and expenditures are recorded when goods and services are received whether cash disbursements are made at the time or not. Budgets are prepared under the assumption that the principal redemption of long-term debt must be assumed by Enterprise Fund activity in conformity with the bond ordinance.
The budget is presented in this document in the legal budget format (non-GAAP) adopted by the City. Under this method: Capital outlays are considered expenditures; grants are considered as revenues and not contributions to capital; depreciation is not budgeted; debt service proceeds are considered to be revenues, not an increase in liabilities; debt payments are shown as expenditures rather than reductions of liabilities; proceeds from the sale of assets are considered revenue, however, the gain or loss is not.
15
Página 30
Budget Summary City of Dover
THIS PAGE INTENTIONALLY LEFT BLANK
16
Página 31
CITY OF DOVER FINANCIAL POLICIES
Amended June 24, 2019
17
Página 32
CITY OF DOVER, DELAWARE
FINANCIAL POLICIES
The purpose of these policies is to present a standardized set of principles that the City follows in managing its financial and budgetary affairs. These are general statements of policies, which represent long-standing principles, traditions, and practices that will be used to guide the City in maintaining financial stability. It will be the responsibility of the Finance Department to ensure the financial objectives of these policies are maintained.
Revenue Policy
- 1.The City will strive to maintain a broad and diversified revenue base that will equitably distribute the burden of supporting City services and will protect the City from short-term fluctuations in any one revenue source.
- 2.The City will actively support economic and industrial development recruitment and retention efforts to provide for a solid revenue base.
- 3.The City will maintain timely collection systems and implement necessary enforcement strategies to collect revenues from available sources.
- 4.The City will establish user fees and charges for services, when feasible, at levels related to the cost of providing the services. The City will review the fees and charges every three to five years to determine modifications needed to keep pace with the cost of providing the services. Property Tax Rates are set annually
- 5.The City will establish, when feasible, self-supporting enterprise funds and intergovernmental service funds in which a relationship between revenues and expenditures clearly exists.
- 6.The City will project current revenues on a conservative basis so the actual revenues will consistently meet or exceed budgeted revenues. Revenues greater or less than the original budget will flow through to the audited Ending Budget Balance.
- 7.The City will maintain a budgetary control system and will prepare reports, which compare actual revenues to budgeted amounts.
- 8.The City will limit the designation of General Fund revenues for specified purposes to maximize flexibility in budgeting and revenue utilization.
- 9.The City will review annually and revise, where necessary, its cost allocation formulas, i.e. internal service departments.
- 10.Upon satisfying all rate covenants the City will provide operating transfers to the General Fund. From the Water/Wastewater Utility no greater than $1,000,000 and from the Electric Utility no greater than $10,000,000.
18
Página 33
Expenditure Policy
- 1.Basic and essential services provided by the City will receive priority for funding, i.e. Public Safety & Health, Utilities, Streets, & Sanitation.
- 2.A report of the expenses of the Public Safety categories that have been identified will be presented to City Council two (2) times; once upon delivery of the proposed budget in May and the other upon the adoption of the budget in July. The report will map the revenues that have been identified to support the expenses, how much of a gap there is, and what the trend is for closing the gap over a 20-year period. The revenues will be the direct revenues of those programs and the Property Tax Revenue, excluding BID taxes.
- 3.The City will adopt a balanced budget, by fund, for all funds maintained by the City, in which total anticipated revenues must equal or exceed the budgeted expenditures, less capital transfers, for each fund. The Beginning Budget Balance will not be considered a revenue source.
- 4.The City will maintain a budgetary control system to ensure adherence to the original adopted budget and will prepare reports, which compare actual expenditures to budgeted amounts. Expenditures greater or less than the original adopted budget will flow through the audited Ending Budget Balance.
- 5.The City will restrict the use of appropriations as follows: Funds appropriated for personnel expenses shall be restricted to use as personnel expenses. Any personnel savings at the end of each fiscal year will be re-appropriated in the next fiscal year to be transferred to the City’s capital funds or unfunded retirement liabilities as approved by City Council; Funds appropriated as capital expenses shall be restricted to use as capital expenses; Funds appropriated as operating expenses shall be restricted to use as operating expenses; All requests for additional personnel shall be accompanied with a five-year estimate on the costs of such position(s), including salaries and other employment costs (OEC’s);
- 6.The City will refrain from budgeting revenues derived from infrequent and unanticipated transactions for ongoing expenses. These revenues will be set aside for asset replacement or as otherwise directed by Council.
- 7.The City will provide access to medical, dental, vision, life, AD & D, and short-term disability insurance for its employees. The cost for these benefits will be a shared responsibility between the City and its employees as outlined in the City Personnel Handbook or collective bargaining agreements
- 8.The City will provide access to medical and dental insurance for its retirees and their families. The cost for these benefits will be a shared responsibility between the City and its retirees as outlined in the City Personnel Handbook or collective bargaining agreements.
19
Página 34
- 9.The City will provide access to appropriate retirement plans for its employees. The City will make contributions for eligible employees at the actuarial determined percentage defined for each of the respective retirement plans.
- 10.The City will establish an Other Post-Employment Benefit Fund (OPEB). The City will make contributions for eligible employees and retirees at the actuarial determined rates or percentages to fund future retiree medical benefits.
Debt Policy
- 1.The City will maintain a debt management policy and full disclosure on financial reports.
- 2.The City will maintain communications with bond rating agencies and continue to strive for improvements in the City’s bond rating.
- 3.The City will adhere to its debt covenants.
- 4.The City will review its debt capacity every three (3) years.
- 5.The City will pay for all capital projects and capital improvements on a pay-as-you-go basis using current revenues if possible. If a project or improvement cannot be financed with current revenues, long-term debt or use of reserves will be recommended.
- 6.The City will refrain from issuing long-term debt for a period in excess of the expected useful life of the capital project.
- 7.The City will use special assessment revenue or other self-supporting bonds instead of general obligation bonds, when practical.
- 8.The City will seek refinancing of outstanding debt if it is determined that the City will benefit by reduced interest expense over the remaining life of the bonds.
Budget Balance/Reserve Policy – General Fund
- 1.The City will strive to maintain a minimum Budget Balance, of at least 8% and no greater than 12% of the current year operating revenues for the General Fund, excluding the carry forward balance. The purpose of the budget balance is to meet temporary fluctuations in cash flows and to provide a cushion for loss of revenues until operating changes can be implemented. If the final Budget Balance exceeds the amount as approved in the budget ordinance, such funds shall be used to provide for capital purchases, unfunded retirement liabilities, or as otherwise designated by City Council. The City may use monies in the Budget Balance only in times of fiscal and economic hardship.
- 2.Once achieved, at no time should the City’s budget balances fall below their specified percentages. If a shortfall occurs in the budget balance and immediately restoring the balances to the specified percentage would cause an extreme burden on the taxpayers, the budget balance may, with the City Council’s approval, be restored to the specified percentage within one (1) year, but in any case, no longer than three (3) years.
20
Página 35
- 3.The City will maintain a minimum reserve, in a contingency account, of at least $700,000. The City may only use monies in the contingency accounts to cover emergencies of a non-recurring nature that are over and above the normal course of operations. Examples are uninsured losses, storms or hurricane damages. The Contingency Reserve will not be used to balance the operating budget.
- 4.The total of the General Fund budget and contingency balances shall not exceed 17% (~ 2 months) of Budgeted Operating Revenues.
- 5.The City will create a Capital Asset Replacement account for Governmental Fund asset procurements. Optimally, the amount set aside for future asset replacements should equal the annual depreciation of the current assets. (Annual Depreciation is approximately $3.5 million per year). The City will appropriate excess (amounts greater than budgeted) revenues to fund this account, or if the balance is less than the $500,000 minimum, $200,000 per annum until such time the minimum balance is replenished.
- 6.The City will create a General Capital Project Fund to account for all General Government asset procurements and projects. The City will provide operating fund transfers and/or debt proceeds for each fiscal year’s Capital Investment Plan. All vehicle and equipment purchases under $25,000 will be budgeted on a pay as you go basis.
Budget Balance/Reserve Policy – Wastewater Fund
- 1.The City will strive to maintain a minimum Budget Balance, of at least 8% and no greater than 17% (two months) of the current year operating revenues for Wastewater Utility Funds, excluding the carry forward balance. The purpose of the budget balance is to meet temporary fluctuations in cash flows and to provide a cushion for loss of revenues until operating changes can be implemented. If the final Budget Balance exceeds the amount as approved in the budget ordinance, such funds shall be used to provide for capital purchases, unfunded retirement liabilities, or as otherwise designated by City Council. The City may use monies in the Budget Balance only in times of fiscal and economic hardship.
- 2.Once achieved, at no time should the City’s budget balances fall below their specified percentages. If a shortfall occurs in the budget balance and immediately restoring the balances to the specified percentage would cause an extreme burden on the ratepayers, the budget balance may, with the City Council’s approval, be restored to the specified percentage within one (1) year, but in any case, no longer than three (3) years.
- 3.The City will maintain a minimum reserve, in a contingency account, of at least $250,000 for the Wastewater Fund. The City may only use monies in the contingency accounts to cover emergencies of a non-recurring nature that are over and above the normal course of operations. Examples are uninsured losses, storms or hurricane damages. The Contingency Reserve will not be used to balance the operating budget.
- 4.The total of the Wastewater Fund budget and contingency balances shall not exceed 25% (3 months) of Budgeted Operating Revenues.
- 5.The City will maintain a Capital Asset Replacement account to cover replacement or procurement of assets of the utility. Optimally, the amount set aside for future asset
21
Página 36
replacements should equal the annual depreciation of the current assets. The City will maintain a minimum balance of $500,000 for Capital Asset Replacements. The City will appropriate excess revenues to fund this account, or if the balance is less than the minimum $100,000 per annum for each utility until such time the minimum balance is achieved.
- 6.The City established by ordinance on December 17, 1996 the Wastewater Impact Fee Reserve to provide for future expansion of the City’s wastewater system due to increased demand. The ordinance further provides for debt service payments attributed to wastewater expansion projects to be funded by the current year’s collection of Impact Fees and the remainder to be deposited into the reserve account. The City shall maintain a minimum of 20% of wastewater revenues in the Impact Fee Reserve account. Amounts used to finance projects shall be replenished by the operating revenues of the Wastewater Fund over the succeeding seven years of any project completion.
- 7.The Wastewater Improvement & Extension Fund budget balance shall be no less than $200,000 of the current fiscal year’s appropriation for wastewater projects to allow for project variances and change orders; a 10% contingency shall be included in project budgets greater than $250,000 if the Department Head determines it to be appropriate. All vehicle and equipment purchases under $25,000 will be budgeted on a pay as you go basis. The City Manager shall make the necessary budget amendments in accordance with the City of Dover Purchasing & Budget Amendment Policies.
Budget Balance/Reserve Policy – Water Fund
- 1.The City will strive to maintain a minimum Budget Balance, of at least 8% and no greater than 17% (two months) of the current year operating revenues for the Water Utility Fund, excluding the carry forward balance. The purpose of the budget balance is to meet temporary fluctuations in cash flows and to provide a cushion for loss of revenues until operating changes can be implemented. If the final Budget Balance exceeds the amount as approved in the budget ordinance, such funds shall be used to provide for capital purchases, unfunded retirement liabilities, or as otherwise designated by City Council. The City may use monies in the Budget Balance only in times of fiscal and economic hardship.
- 2.Once achieved, at no time should the City’s budget balances fall below their specified percentages. If a shortfall occurs in the budget balance and immediately restoring the balances to the specified percentage would cause an extreme burden on the ratepayers, the budget balance may, with the City Council’s approval, be restored to the specified percentage within one (1) year, but in any case, no longer than three (3) years.
- 3.The City will maintain a minimum reserve, in a contingency account, of at least $250,000 for each of the Water Funds. The City may only use monies in the contingency accounts to cover emergencies of a non-recurring nature that are over and above the normal course of operations. Examples are uninsured losses, storms or hurricane damages. The Contingency Reserve will not be used to balance the operating budget.
- 4.The total of the Water Fund budget and contingency balances shall not exceed 25% (3 months) of Budgeted Operating Revenues.
22
Página 37
- 5.The City will maintain a Capital Asset Replacement account to cover replacement or procurement of assets of the utility. Optimally, the amount set aside for future asset replacements should equal the annual depreciation of the current assets. The City will maintain a minimum balance of $500,000 for Capital Asset Replacements. The City will appropriate excess revenues to fund this account, or if the balance is less than the minimum $100,000 per annum for each utility until such time the minimum balance is achieved.
- 6.The City established by ordinance on February 1, 2008 the Water Impact Fee Reserve to provide for future expansion of the City’s water system due to increased demand. The ordinance further provides for debt service payments attributed to water system expansion projects to be funded by the current year’s collection of Impact Fees and the remainder to be deposited into the reserve account. The City shall maintain a minimum of $1.5 million of water revenues in the Impact Fee Reserve account. Amounts used to finance projects shall be replenished by the operating revenues of the Water Fund over the succeeding seven (7) years of any project completion.
- 7.The Water Improvement & Extension Fund budget balance shall be no less than $200,000 of the current fiscal year’s appropriation for water projects to allow for project variances and change orders; a 10% contingency shall be included in project budgets greater than $250,000 if the Department Head determines it to be appropriate. All vehicle and equipment purchases under $25,000 will be budgeted on a pay as you go basis. The City Manager shall make the necessary budget amendments in accordance with the City of Dover Purchasing & Budget Amendment Policies.
Budget Balance/Reserve Policy – Electric Revenue Fund
- 1.The City will strive to maintain a minimum Budget Balance, of at least 12% (45 days) of the current year operating revenues for the Electric Revenue Fund, excluding the carry forward balance and power cost adjustments. The purpose of the budget balance is to meet temporary fluctuations in cash flows and to provide a cushion for loss of revenues until operating changes can be implemented. If the final Budget Balance exceeds the amount as approved in the budget ordinance, such funds shall be used to provide for capital purchases, unfunded retirement liabilities, or as otherwise designated by City Council. The City may use monies in the Budget Balance only in times of fiscal and economic hardship.
- 2.Once achieved, at no time should the City’s budget balances fall below their specified percentages. If a shortfall occurs in the budget balance and immediately restoring the balances to the specified percentage would cause an extreme burden on the ratepayers, the budget balance may, with the City Council’s approval, be restored to the specified percentage within one (1) year, but in any case, no longer than three (3) years.
- 3.The City will maintain a minimum reserve, in a contingency account, of at least $750,000 for the Electric Revenue Fund. The City may only use monies in the contingency accounts to cover emergencies of a non-recurring nature that are over and above the normal course of operations. Examples are uninsured losses, storms or hurricane damages. The Contingency Reserve will not be used to balance the operating budget.
- 4.The total of the combined Electric Revenue Fund budget and contingency balances shall not exceed 25% (3 months) of Budgeted Operating Revenues.
23
Página 38
- 5.The City has established by bond covenant an account to cover insurance deductibles on the electric transmission and distribution system or the generating plants. The City shall maintain a minimum balance of $750,000 to cover various deductibles.
- 6.Recognizing price fluctuations in the wholesale power markets the City has established a rate stabilization reserve. The purpose of using such a reserve is to level off the fluctuations in the wholesale power supply market and in turn provide stable rates to our customers. In those instances where the actual cost of power supply and generation are less/more than the budgeted cost of power supply and generation, the City will transfer the difference to/from the Rate Stabilization Reserve. The balance shall be maintained at a minimum of 10% not to exceed 20% of the purchase power cost in any given year. If the reserve balance exceeds the 20% maximum, a credit will be applied to the power cost adjustment over the next three (3) fiscal years.
- 7.The Electric Improvement & Extension Fund budget balance shall be no less than $200,000 of the current fiscal year’s appropriation for electric system projects to allow for project variances and change orders; a 10% contingency shall be included in project budgets greater than $250,000 if the Department Head determines it to be appropriate. All vehicle and equipment purchases under $25,000 will be budgeted on a pay as you go basis. The City Manager shall make the necessary budget amendments in accordance with the City of Dover Purchasing & Budget Amendment Policies.
- 8.The City has established an account to provide for capital financing of Future Capacity or system expansion. The City shall maintain a balance equivalent to the value of 10% growth in capacity at any given time, or no less than $10,000,000. Amounts used to finance projects shall be replenished by the operating revenues of the Electric Revenue Fund over the succeeding seven years of any project completion.
- 9.The City has established an account to provide for replacement or procurement of utility system assets, otherwise known as Depreciation Reserve. Optimally, the amount set aside for future asset replacements should equal the annual depreciation of the current assets. The City will maintain a minimum balance of $10,000,000. The primary purpose of this account is to provide partial or all financing of major capital projects and minimize debt service payments. The account is also intended to cover unforeseen capital replacements due to equipment breakdowns, storms or hurricane damages. Amounts used to finance projects shall be replenished by the operating revenues of the Electric Revenue Fund over the succeeding seven (7) years of any project completion
- 10.The total of the combined Electric Revenue and Electric Improvement & Extension Fund budget and reserve balances shall be benchmarked at 50% Budgeted Operating Revenues. Operating Fund Budget Balance and Reserves shall be adjusted to appropriate levels through adjustments in the operating budget. Improvement & Extension Fund Budget Balance and Reserves shall be adjusted in accordance with the Capital Improvement Plan.
Investment and Cash Management Policy
- 1.The City will deposit all receipts on a timely basis in interest bearing accounts.
24
Página 39
- 2.The City will strive to maximize the return on its investment portfolio without jeopardizing principal amounts.
- 3.The City will limit its investments to the types of securities provided for by Delaware statutes.
- 4.The City will diversify its investments by maturity date to protect against market fluctuations.
- 5.The City will purchase securities from qualified institutions based on competitive bids in an effort to obtain the highest available rates.
- 6.The City will maintain an Investment Policy based on prudent investment practices and will monitor all investment managers’ compliance with policy objectives.
Capital Improvement Policy
- 1.The City will prepare and update, as needed a five-year Capital Improvements Program (CIP) which will provide for the orderly maintenance, replacement, and expansion of capital assets.
- 2.The CIP will identify long-range capital projects and capital improvements of all types, which will be coordinated with the annual operating budget to maintain full utilization of available revenue sources.
- 3.When preparing the CIP, the City will seek to identify all viable capital projects and capital improvements required during the subsequent five-year period. These projects and improvements will be prioritized by year and by funding source.
- 4.Every attempt will be made to match projects and improvements with available funding sources. Future operating costs and savings associated with a project or an improvement will also be given consideration in the establishment of priorities.
- 5.When appropriate, the City will seek Federal, State, and other funding to assist in financing capital projects and capital improvements.
- 6.The City will incorporate the reasonable findings and recommendations of other cities’ Boards, Commissions, Committees, and Citizen Task Forces, as they relate to capital projects and improvements.
- 7.The City will seek input from the public by holding public hearings in relation to the establishment of projects and project priorities.
Financial Reporting Policy
- 1.The City’s accounting system will maintain records in accordance with accounting standards and principles outlined by the Governmental Accounting Standards Board (GASB), Financial Accounting Standards Board (FASB), and the State of Delaware.
- 2.The City will employ an independent accounting firm to perform an annual audit of the City’s finances and make the annual audit available to all required and interested parties.
25
Página 40
- 3.The City will produce monthly and quarterly financial statements reporting the current periods’ activity for all funds maintained by the City.
- 4.The City will prepare an annual budget document that provides a basic understanding of the City’s planned financial operations for the coming fiscal year. Copies of the proposed and final budget will be made available to all interested parties and opportunities will be provided for citizen input prior to final decisions on the budget.
- 5.The City will place continued emphasis on review and maintenance of an accounting system which provides strong internal budgetary and accounting controls designed to provide reasonable assurance, but not absolute, assurance regarding:
(a) the safeguarding of assets against loss from unauthorized use or disposition and, (b) the reliability of financial records for preparing financial statements and reports, and the maintaining accountability for assets.
- 6.The City will seek annual renewal of the Government Finance Officers Association’s (GFOA) Certificate of Achievement for Excellence in Financial Reporting.
Adoption:
Approval by City Council: January 28, 2002
Most recent amendments:
1. Amended by City Council on September 8, 2014
2. Amended by City Council on October 12, 2015
3. Amended by City Council on June 24, 2019
26
Página 41
FUND SUMMARIES THE FOLLOWING SUBSECTIONS ARE INCLUDED:
ALL FUNDS SUMMARY
GENERAL FUND
SANITATION
WASTEWATER FUND
WATER FUND
ELECTRIC FUND
Página 42
THIS PAGE INTENTIONALLY LEFT BLANK
Página 43
City of Dover Fiscal
Year 2026
Recommended Budget
Budget Highlights & Discussion Points
27
Página 44
THIS PAGE INTENTIONALLY LEFT BLANK
28
Página 45
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
City of Dover
All Funds Summary
Fiscal 2026 Recommended Budget
Fund or Beginning Revenues/ Expenses/ Ending
Reserve Account Balances Transfers In Transfers Out Balances
| 1 | General Fund | ||||||
| 2 | Operating Fund | $ | 11,180,500 | $ 52,380,300 | $ (59,654,800) | $ | 3,906,000 |
| 3 | Contingency Account | 790,800 | 20,000 | - | 810,800 | ||
| 4 | Capital Project Fund | 3,566,300 | 10,144,900 | (9,435,700) | 4,275,500 | ||
| 5 | Capital Asset Reserve | 1,524,900 | (120,200) | - | 1,404,700 | ||
| 6 | Parkland Reserve | 105,300 | (5,300) | - | 100,000 | ||
| 7 | Total General Fund | 17,167,800 | 62,419,700 | (69,090,500) | 10,497,000 |
8 Sanitation
| 9 | Operating Fund | - | 5,168,400 | (4,619,300) | 549,100 |
| 10 | Contingency Account | 140,000 | - | - | 140,000 |
| 11 | I & E Fund | - | 735,000 | (735,000) | - |
| 12 | Total Sanitation Fund | 140,000 | 5,903,400 | (5,354,300) | 689,100 |
13 Water Fund
| 14 | Operating Fund | 1,295,000 | 8,497,900 | (8,110,700) | 1,682,200 |
| 15 | Contingency Account | 326,700 | 10,000 | - | 336,700 |
| 16 | I & E Fund | 93,500 | 8,830,600 | (8,719,600) | 204,500 |
| 17 | Capital Asset Reserve | 616,200 | 20,000 | - | 636,200 |
| 18 | Impact Fee Reserve | 2,082,713 | 80,900 | (30,900) | 2,132,713 |
| 19 | Total Water Fund | 4,414,113 | 17,439,400 | (16,861,200) | 4,992,313 |
20 Wastewater Fund
| 21 | Operating Fund | 3,507,000 | 12,711,700 | (13,176,900) | 3,041,800 |
| 22 | Contingency Account | 326,700 | 12,000 | - | 338,700 |
| 23 | I & E Fund | 787,100 | 2,752,100 | (2,702,100) | 837,100 |
| 24 | Capital Asset Reserve | 614,800 | 20,000 | - | 634,800 |
| 25 | Impact Fee Reserve | 6,064,600 | 204,800 | (4,800) | 6,264,600 |
| 26 | Total Wastewater Fund | 11,300,200 | 15,700,600 | (15,883,800) | 11,117,000 |
27 Electric Fund
| 28 | Operating Fund * | 48,251,000 | 104,590,400 | (122,569,900) | 30,271,500 |
| 29 | Contingency Account | 1,012,400 | 35,000 | - | 1,047,400 |
| 30 | Insurance Reserve | 888,200 | 30,000 | - | 918,200 |
| 31 | Rate Stabilization Reserve | 9,804,556 | 360,000 | - | 10,164,556 |
| 32 | I & E Fund | 7,761,874 | 10,738,300 | (10,738,300) | 7,761,874 |
| 33 | Depreciation Reserve | 19,616,687 | 800,000 | - | 20,416,687 |
| 34 | Future Capacity Reserve | 15,490,300 | 500,000 | - | 15,990,300 |
| 35 | Total Electric Fund | 102,825,017 | 117,053,700 | (133,308,200) | 86,570,517 |
36 Less:
| 37 | Interfund Operating Transfers | (12,000,000) | 12,000,000 | |
| 38 | Capital and Reserve Transfers | (20,523,900) | 20,523,900 | |
| 39 | Interfund Allocations | 4,565,000 | (4,565,000) | |
| 40 Subtotal Major Operating Funds | 135,847,130 | 218,516,800 | (240,498,000) | 113,865,930 |
| 41 | Workers Compensation | 6,449,683 | 1,552,000 | (660,000) | 7,341,683 | |
| 42 | Community Transportation Fund | 528,000 | - | (528,000) | - | |
| 43 | Police Grants | - | 585,900 | (765,000) | (179,100) | |
| 44 | Library Grants | - | 401,150 | (401,150) | - | |
| 45 | CDBG | - | 318,000 | (318,000) | - | |
| 46 | American Recovery Act Funding | 881,600 | - | - | 881,600 | |
| 47 | Economic/Community Development | 734,000 | - | - | 734,000 | |
| 48 | Ambulance Service | - | 850,000 | (600,000) | 250,000 | |
| 49 | Subs Abuse - Youth Prog | 51,210 | 90,000 | (103,200) | 38,010 | |
| 50 | Total All Funds & Reserves | $ 144,491,624 | $ 222,313,850 | $ (243,873,350) | $ | 122,932,124 |
Notes: Special Revenue Funds with receipts that pass over to the General Fund are not individually included. These are Municipal Street Aid, Civil Traffic Penalties, and Transfer Taxes.
29
Página 46
FY 2026 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Fiscal Year 2025/2026
General Fund Revenue
| GRANTS | COURT OF |
|---|---|
| 5.0% | CHANCERY FEES |
| 8.7% | |
| POLICE FINES & | |
| FEES | FRANCHISE FEES |
| LODGING TAX | |
| 2.6% | 1.0% |
| 1.0% | |
LIBRARY &
| LICENSES & | RECREATION FEES |
|---|---|
| PERMITS | 0.9% |
| 6.3% | |
OTHER
| TRANSFER TAXES | MISCELLANEOUS |
|---|---|
| 3.9% | RECEIPTS |
| 0.4% | |
INTERFUND SERVICE FEES 15.3%
PROPERTY TAXES
31.9%
UTILITY TRANSFERS
23.2%
30
Página 47
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
GENERAL FUND
CASH RECEIPT SUMMARY
2024/25 $ DIFFERENCE % CHG
2023/2024 ORIGINAL 2024/25 2025/2026 2025/2026 FY26 VS FY26 VS
ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED FY25 BUDGET FY25 VS
| 1 | BEGINNING BALANCE | 12,057,508 | 5,547,600 | 14,860,800 | 11,180,500 | 11,180,500 | 5,632,900 | 101.5% |
| . | ||||||||
|---|---|---|---|---|---|---|---|---|
| 2 | FINES AND POLICE REVENUE | 697,859 | 781,100 | 781,100 | 767,900 | 767,900 | (13,200) | -1.7% |
| 3 | LIBRARY REVENUES | 148,058 | 153,100 | 153,100 | 151,200 | 151,200 | (1,900) | -1.2% |
| 4 | KENT COUNTY BOOK REIMBURSEMENT | 425,611 | 155,000 | 155,000 | 180,000 | 180,000 | 25,000 | 16.1% |
| 5 | BUSINESS LICENSES | 1,484,323 | 1,616,400 | 1,616,400 | 1,540,000 | 1,540,000 | (76,400) | -4.7% |
| 6 | PERMITS AND OTHER FEES | 2,906,381 | 1,785,000 | 1,797,000 | 1,722,000 | 1,722,000 | (63,000) | -3.5% |
| 7 | MISCELLANEOUS CHARGES | 3,133,600 | 1,262,000 | 1,250,000 | - | - | (1,262,000) | -100.0% |
| 8 | POLICE EXTRA DUTY | 597,457 | 497,500 | 497,500 | 514,000 | 514,000 | 16,500 | 3.3% |
| 9 | PROPERTY TAXES | 16,223,148 | 16,876,000 | 16,876,000 | 16,500,000 | 16,500,000 | (376,000) | -2.2% |
| 10 | RECREATION REVENUE | 140,377 | 145,000 | 145,000 | 145,000 | 145,000 | - | 0.0% |
| 11 | FRANCHISE FEE | 524,452 | 600,000 | 600,000 | 500,000 | 500,000 | (100,000) | -16.7% |
| 12 | RENT REVENUE - GARRISON FARM | 98,139 | 76,800 | 76,800 | 100,000 | 100,000 | 23,200 | 30.2% |
| 13 | COURT OF CHANCERY FEES | 4,449,818 | 3,500,000 | 3,500,000 | 4,500,000 | 4,500,000 | 1,000,000 | 28.6% |
| 14 | INVESTMENT INCOME | 75,316 | 50,000 | 50,000 | 100,000 | 100,000 | 50,000 | 100.0% |
| 15 | RECEIPTS SUBTOTAL | 34,871,085 | 27,497,900 | 27,497,900 | 26,720,100 | 26,720,100 | (777,800) | -2.8% |
| 16 | INTERFUND SERVICE RECEIPTS | |||||||
| 17 | INTERFUND SERVICE RECEIPTS GEN GOV | 1,592,553 | 1,679,500 | 1,679,500 | 1,788,400 | 1,788,200 | 108,900 | 6.5% |
| 18 | INTERFUND SERVICE RECEIPTS PUB WORKS | 667,278 | 857,600 | 857,600 | 983,100 | 983,100 | 125,500 | 14.6% |
| 19 | INTERFUND SERVICE RECEIPTS CENT SRVCS | 1,031,077 | 2,035,700 | 2,035,700 | 1,428,900 | 1,793,700 | (606,800) | -29.8% |
| 20 | INTERFUND SERVICE RECEIPTS FIN ADMIN | 2,733,566 | 2,553,400 | 2,553,400 | 3,424,900 | 3,373,700 | 871,500 | 34.1% |
| 21 | INTERFUND SERVICE RECEIPTS SUBTOTAL | 6,024,473 | 7,126,200 | 7,126,200 | 7,625,300 | 7,938,700 | 499,100 | 7.0% |
22 GRANTS:
| 23 POLICE EXTRA DUTY | 604,418 | 165,000 | 165,000 | 708,000 | 708,000 | 543,000 | 329.1% |
| 24 POLICE GRANTS FUND | 484,658 | 145,000 | 145,000 | 165,000 | 165,000 | 20,000 | 13.8% |
| 25 POLICE PENSION GRANT | 812,409 | 620,000 | 620,000 | 850,000 | 850,000 | 230,000 | 37.1% |
| 26 GREEN ENERGY GRANT | 98,500 | 98,500 | 98,500 | 98,500 | 98,500 | - | 0.0% |
| 27 GRANTS SUBTOTAL | 2,054,726 | 1,028,500 | 1,028,500 | 1,821,500 | 1,821,500 | 793,000 | 77.1% |
28 TRANSFERS FROM:
| 29 TRANSFER TAX | 2,322,756 | 2,000,000 | 2,000,000 | 2,000,000 | 2,000,000 | - | 0.0% |
| 30 LODGING TAX | - | 500,000 | 500,000 | 500,000 | 500,000 | - | 0.0% |
| 31 AMBULANCE SERVICE | - | 600,000 | 600,000 | 600,000 | 600,000 | - | 0.0% |
| 32 MUNICIPAL STREET AID | 789,494 | 750,000 | 750,000 | 750,000 | 750,000 | - | 0.0% |
| 33 CIVIL TRAFFIC PENALTIES | 66,052 | 50,000 | 50,000 | 50,000 | 50,000 | - | 0.0% |
| 34 WATER/WASTEWATER | 1,000,000 | 2,000,000 | 2,000,000 | 2,000,000 | 2,000,000 | - | 0.0% |
| 35 ELECTRIC | 8,000,000 | 10,000,000 | 12,465,200 | 10,000,000 | 10,000,000 | - | 0.0% |
| 36 TRANSFERS FROM SUBTOTAL | 12,178,302 | 15,900,000 | 18,365,200 | 15,900,000 | 15,900,000 | - | 0.0% |
37 TOTAL REVENUES 55,128,587 51,552,600 54,017,800 52,066,900 52,380,300 514,300 1.0%
38 TOTAL BEGINNING BALANCE & REVENUE 67,186,095 57,100,200 68,878,600 63,247,400 63,560,800 6,147,200 10.8%
GENERAL FUND EXPENSE SUMMARY
| 2024/25 | $ DIFFERENCE | % CHG | ||||||
|---|---|---|---|---|---|---|---|---|
| 2023/2024 | ORIGINAL | 2024/25 | 2025/2026 | 2025/2026 | FY26 VS | FY26 VS | ||
| ACTUAL | APPROVED | PROJECTED | REQUESTED | RECOMMENDED | FY25 BUDGET | FY25 VS | ||
| 1 | DEPARTMENT EXPENSES: | |||||||
| 2 | CITY CLERK | 428,268 | 486,800 | 486,800 | 492,900 | 492,900 | 6,100 | 1.3% |
| 3 | COUNCIL | 234,310 | 266,500 | 266,500 | 276,600 | 276,600 | 10,100 | 3.8% |
| 4 | PLANNING | 615,537 | 898,800 | 898,800 | 1,081,400 | 1,079,800 | 181,000 | 20.3% |
| 5 | CITY MANAGER | 1,477,117 | 1,279,000 | 1,379,000 | 1,470,600 | 1,470,300 | 191,300 | 15.0% |
| 6 | HUMAN RESOURCES | 373,335 | 478,000 | 478,000 | 495,200 | 495,200 | 17,200 | 3.6% |
| 7 | MAYOR | 201,462 | 304,600 | 304,600 | 316,700 | 316,700 | 12,100 | 4.0% |
| 8 | FIRE | 854,396 | 1,008,300 | 1,013,800 | 1,732,800 | 1,133,800 | 125,500 | 71.9% |
| 9 | LIFE SAFETY | 852,815 | 1,222,500 | 1,222,500 | 1,662,200 | 1,664,100 | 441,600 | 36.0% |
| 10 | CODE ENFORCEMENT | 780,365 | 1,163,500 | 1,161,500 | 1,213,700 | 1,143,700 | (19,800) | 4.3% |
| 11 | INSPECTIONS | 733,048 | 767,400 | 769,400 | 700,100 | 769,100 | 1,700 | -8.8% |
| 12 | POLICE | 20,713,420 | 23,061,100 | 23,061,100 | 24,749,200 | 24,749,200 | 1,688,100 | 7.3% |
| 13 | POLICE EXTRA DUTY | 746,018 | 405,000 | 405,000 | 910,700 | 910,700 | 505,700 | 124.9% |
| 14 | PUBLIC WORKS - ADMINISTRATION | 616,713 | 670,700 | 670,700 | 743,500 | 743,500 | 72,800 | 10.9% |
| 15 | STREETS | 713,543 | 797,000 | 797,000 | 899,800 | 899,800 | 102,800 | 12.9% |
| 16 | GROUNDS MAINTENANCE | 1,603,126 | 1,788,500 | 1,788,500 | 2,047,300 | 2,047,300 | 258,800 | 14.5% |
| 17 | STORMWATER | 708,159 | - | 1,021,200 | 1,109,900 | 1,104,900 | 1,104,900 | 0.0% |
| 18 | FACILITIES MANAGEMENT | 798,550 | 886,400 | 886,400 | 807,900 | 807,900 | (78,500) | -8.9% |
| 19 | GENERAL FUND ENGINEERING | 251,951 | 292,900 | 292,900 | 303,500 | 303,500 | 10,600 | 3.6% |
| 20 | LIBRARY | 1,904,921 | 2,146,000 | 2,146,000 | 2,373,800 | 2,373,800 | 227,800 | 10.6% |
| 21 | RECREATION | 1,446,704 | 1,573,300 | 1,583,300 | 1,653,300 | 1,653,300 | 80,000 | 5.1% |
| 22 | PROCUREMENT & INVENTORY | 826,622 | 958,600 | 958,600 | 1,011,600 | 1,011,600 | 53,000 | 5.5% |
| 23 | FLEET MAINTENANCE | 1,032,448 | 1,081,400 | 1,081,400 | 1,139,400 | 1,139,400 | 58,000 | 5.4% |
| 24 | INFORMATION TECHNOLOGY | 810,666 | 920,500 | 920,500 | 1,045,700 | 1,045,700 | 125,200 | 13.6% |
| 25 | FINANCE | 752,831 | 1,009,900 | 1,009,900 | 1,025,400 | 1,025,400 | 15,500 | 1.5% |
| 26 | CUSTOMER SERVICE | 1,280,368 | 1,456,800 | 1,446,800 | 1,567,300 | 1,512,400 | 55,600 | 7.6% |
| 27 | DEPARTMENT SUBTOTALS | 40,756,692 | 44,923,500 | 46,050,200 | 50,830,500 | 50,170,600 | 5,247,100 | 13.1% |
| 28 | OTHER EXPENDITURES: | |||||||
| 29 | DEBT SERVICE | 627,990 | 626,700 | 626,700 | 625,200 | 625,200 | (1,500) | -0.2% |
| 30 | CONTRIBUTION TO DDP | 150,000 | 150,000 | 150,000 | 150,000 | 150,000 | - | 0.0% |
| 31 | INSURANCE | 1,112,185 | 1,044,300 | 1,044,300 | 1,200,000 | 1,200,000 | 155,700 | 14.9% |
| 32 | OTHER EMPLOYMENT EXPENSES | - | - | - | 200,000 | 200,000 | 200,000 | 0.0% |
| 33 | BANK & CREDIT CARD FEES | 33,458 | 30,700 | 30,700 | 57,800 | 57,800 | 27,100 | 88.3% |
| 34 | STREET LIGHTS | 835,660 | 841,100 | 841,100 | 830,000 | 830,000 | (11,100) | -1.3% |
| 35 | OTHER EXPENSE SUBTOTAL | 5,307,293 | 4,796,700 | 4,796,700 | 3,063,000 | 3,063,000 | (1,733,700) | -36.1% |
| 36 | TRANSFERS | |||||||
| 37 | TRANSFER TO CAPITAL FUND - PROJECTS | 3,037,800 | 3,173,600 | 4,617,600 | 5,720,400 | 5,511,200 | 2,337,600 | 80.2% |
| 38 | APPROP. POLICE PENSION - STATE GRANT | 812,409 | 692,800 | 692,800 | 850,000 | 850,000 | 157,200 | 22.7% |
| 39 | TRANSFER TO ELECTRIC FUND (ERP) | 25,000 | 25,000 | 25,000 | 25,000 | 25,000 | - | 0.0% |
| 40 | TRANSFER TO OTHER/CABLE FRANCHISE RESV | 10,315 | - | - | 10,000 | 10,000 | 10,000 | 0.0% |
| 41 | TRANSFER TO INVENTORY WRITE-OFFS | 25,000 | 25,000 | 25,000 | 25,000 | 25,000 | - | 0.0% |
| 42 | TRANSFERS SUBTOTAL | 6,261,324 | 5,407,200 | 6,851,200 | 6,630,400 | 6,421,200 | 1,014,000 | 22.6% |
| 43 TOTAL EXPENDITURES | 52,325,309 | 55,127,400 | 57,698,100 | 60,523,900 | 59,654,800 | 4,527,400 | 9.8% |
| 44 BUDGET BALANCE | 14,860,786 | 1,972,800 | 11,180,500 | 2,723,500 | 3,906,000 | 1,933,200 | 38.1% |
| 45 TOTAL BUDGET BALANCE & EXPENDITURES | 67,186,095 | 57,100,200 | 68,878,600 | 63,247,400 | 63,560,800 | 6,460,600 | 10.8% |
| 46 EXCEEDS/(REMAINS)TO MEET REQUIREMENT | 10,450,500 | (2,151,400) | 6,859,100 | (1,441,900) | (284,400) |
31
Página 48
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
GENERAL FUND EXPENSE SUMMARY
| 2024/25 | $ DIFFERENCE | % CHG | ||||||
|---|---|---|---|---|---|---|---|---|
| 2023/2024 | ORIGINAL | 2024/25 | 2025/2026 | 2025/2026 | FY26 VS | FY26 VS | ||
| ACTUAL | APPROVED | PROJECTED | REQUESTED | RECOMMENDED | FY25 BUDGET | FY25 VS | ||
| 1 | DEPARTMENT EXPENSES: | |||||||
| 2 | CITY CLERK | 428,268 | 486,800 | 486,800 | 492,900 | 492,900 | 6,100 | 1.3% |
| 3 | COUNCIL | 234,310 | 266,500 | 266,500 | 276,600 | 276,600 | 10,100 | 3.8% |
| 4 | PLANNING | 615,537 | 898,800 | 898,800 | 1,081,400 | 1,079,800 | 181,000 | 20.3% |
| 5 | CITY MANAGER | 1,477,117 | 1,279,000 | 1,379,000 | 1,470,600 | 1,470,300 | 191,300 | 15.0% |
| 6 | HUMAN RESOURCES | 373,335 | 478,000 | 478,000 | 495,200 | 495,200 | 17,200 | 3.6% |
| 7 | MAYOR | 201,462 | 304,600 | 304,600 | 316,700 | 316,700 | 12,100 | 4.0% |
| 8 | FIRE | 854,396 | 1,008,300 | 1,013,800 | 1,732,800 | 1,133,800 | 125,500 | 71.9% |
| 9 | LIFE SAFETY | 852,815 | 1,222,500 | 1,222,500 | 1,662,200 | 1,664,100 | 441,600 | 36.0% |
| 10 | CODE ENFORCEMENT | 780,365 | 1,163,500 | 1,161,500 | 1,213,700 | 1,143,700 | (19,800) | 4.3% |
| 11 | INSPECTIONS | 733,048 | 767,400 | 769,400 | 700,100 | 769,100 | 1,700 | -8.8% |
| 12 | POLICE | 20,713,420 | 23,061,100 | 23,061,100 | 24,749,200 | 24,749,200 | 1,688,100 | 7.3% |
| 13 | POLICE EXTRA DUTY | 746,018 | 405,000 | 405,000 | 910,700 | 910,700 | 505,700 | 124.9% |
| 14 | PUBLIC WORKS - ADMINISTRATION | 616,713 | 670,700 | 670,700 | 743,500 | 743,500 | 72,800 | 10.9% |
| 15 | STREETS | 713,543 | 797,000 | 797,000 | 899,800 | 899,800 | 102,800 | 12.9% |
| 16 | GROUNDS MAINTENANCE | 1,603,126 | 1,788,500 | 1,788,500 | 2,047,300 | 2,047,300 | 258,800 | 14.5% |
| 17 | STORMWATER | 708,159 | - | 1,021,200 | 1,109,900 | 1,104,900 | 1,104,900 | 0.0% |
| 18 | FACILITIES MANAGEMENT | 798,550 | 886,400 | 886,400 | 807,900 | 807,900 | (78,500) | -8.9% |
| 19 | GENERAL FUND ENGINEERING | 251,951 | 292,900 | 292,900 | 303,500 | 303,500 | 10,600 | 3.6% |
| 20 | LIBRARY | 1,904,921 | 2,146,000 | 2,146,000 | 2,373,800 | 2,373,800 | 227,800 | 10.6% |
| 21 | RECREATION | 1,446,704 | 1,573,300 | 1,583,300 | 1,653,300 | 1,653,300 | 80,000 | 5.1% |
| 22 | PROCUREMENT & INVENTORY | 826,622 | 958,600 | 958,600 | 1,011,600 | 1,011,600 | 53,000 | 5.5% |
| 23 | FLEET MAINTENANCE | 1,032,448 | 1,081,400 | 1,081,400 | 1,139,400 | 1,139,400 | 58,000 | 5.4% |
| 24 | INFORMATION TECHNOLOGY | 810,666 | 920,500 | 920,500 | 1,045,700 | 1,045,700 | 125,200 | 13.6% |
| 25 | FINANCE | 752,831 | 1,009,900 | 1,009,900 | 1,025,400 | 1,025,400 | 15,500 | 1.5% |
| 26 | CUSTOMER SERVICE | 1,280,368 | 1,456,800 | 1,446,800 | 1,567,300 | 1,512,400 | 55,600 | 7.6% |
| 27 | DEPARTMENT SUBTOTALS | 40,756,692 | 44,923,500 | 46,050,200 | 50,830,500 | 50,170,600 | 5,247,100 | 13.1% |
| 28 | OTHER EXPENDITURES: | |||||||
| 29 | DEBT SERVICE | 627,990 | 626,700 | 626,700 | 625,200 | 625,200 | (1,500) | -0.2% |
| 30 | CONTRIBUTION TO DDP | 150,000 | 150,000 | 150,000 | 150,000 | 150,000 | - | 0.0% |
| 31 | INSURANCE | 1,112,185 | 1,044,300 | 1,044,300 | 1,200,000 | 1,200,000 | 155,700 | 14.9% |
| 32 | OTHER EMPLOYMENT EXPENSES | - | - | - | 200,000 | 200,000 | 200,000 | 0.0% |
| 33 | BANK & CREDIT CARD FEES | 33,458 | 30,700 | 30,700 | 57,800 | 57,800 | 27,100 | 88.3% |
| 34 | STREET LIGHTS | 835,660 | 841,100 | 841,100 | 830,000 | 830,000 | (11,100) | -1.3% |
| 35 | OTHER EXPENSE SUBTOTAL | 5,307,293 | 4,796,700 | 4,796,700 | 3,063,000 | 3,063,000 | (1,733,700) | -36.1% |
| 36 | TRANSFERS | |||||||
| 37 | TRANSFER TO CAPITAL FUND - PROJECTS | 3,037,800 | 3,173,600 | 4,617,600 | 5,720,400 | 5,511,200 | 2,337,600 | 80.2% |
| 38 | APPROP. POLICE PENSION - STATE GRANT | 812,409 | 692,800 | 692,800 | 850,000 | 850,000 | 157,200 | 22.7% |
| 39 | TRANSFER TO ELECTRIC FUND (ERP) | 25,000 | 25,000 | 25,000 | 25,000 | 25,000 | - | 0.0% |
| 40 | TRANSFER TO OTHER/CABLE FRANCHISE RESV | 10,315 | - | - | 10,000 | 10,000 | 10,000 | 0.0% |
| 41 | TRANSFER TO INVENTORY WRITE-OFFS | 25,000 | 25,000 | 25,000 | 25,000 | 25,000 | - | 0.0% |
| 42 | TRANSFERS SUBTOTAL | 6,261,324 | 5,407,200 | 6,851,200 | 6,630,400 | 6,421,200 | 1,014,000 | 22.6% |
| 43 TOTAL EXPENDITURES | 52,325,309 | 55,127,400 | 57,698,100 | 60,523,900 | 59,654,800 | 4,527,400 | 9.8% |
| 44 BUDGET BALANCE | 14,860,786 | 1,972,800 | 11,180,500 | 2,723,500 | 3,906,000 | 1,933,200 | 38.1% |
| 45 TOTAL BUDGET BALANCE & EXPENDITURES | 67,186,095 | 57,100,200 | 68,878,600 | 63,247,400 | 63,560,800 | 6,460,600 | 10.8% |
| 46 EXCEEDS/(REMAINS)TO MEET REQUIREMENT | 10,450,500 | (2,151,400) | 6,859,100 | (1,441,900) | (284,400) |
32
Página 49
FY 2026 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Fiscal Year 2025/2026
General Fund Expenditures
By Major Function
TRANSFER TO
CAPITAL PROJECTS
9.2%
OTHER
| 0.4% | CITY |
| DEBT SERVICE | INSURANCE |
| ADMINISTRATION | |
|---|---|
| 1.0% | 2.0% |
| 5.1% | |
| STREET LIGHTS | LIBRARY, |
|---|---|
| 1.4% | RECREATION & |
| GROUNDS | |
| 6.8% | |
| RETIREE PENSION | |
| CONTRIBUTIONS | |
| 1.4% | |
| PLANNING & | |
| INSPECTIONS | |
| RETIREE MEDICAL | 7.8% |
| CONTRIBUTIONS | |
| 0.3% | |
PUBLIC WORKS 11.8%
FINANCIAL ADMINISTRATION 7.8%
FIRE 1.9%
POLICE 43.0%
Several General Fund Departments service all City operations. The General Fund bills the utility funds services provided. The receipts are reported as revenue in the General Fund and not netted against the expenditures.
33
Página 50
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
GOVERNMENTAL CAPITAL PROJECTS FUND SUMMARY
2024/25 $ DIFFERENCE % CHG
2023/2024 ORIGINAL 2024/25 2025/2026 2025/2026 FY26 VS FY26 VS
ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED FY25 BUDGET FY25 VS
1 BEGINNING BALANCE - PROJECTS 6,188,667 348,200 8,463,200 3,566,300 3,566,300 3,218,100 924.2%
| 2 | REVENUES | |||||||
| 3 | STATE GRANTS - Other | 805,807 | 948,900 | 2,493,900 | 3,924,500 | 3,924,500 | 2,975,600 | 313.6% |
| 4 | LINE OF CREDIT (HEAVY DUTY VEHICLES) | - | - | 811,400 | - | - | - | 0.0% |
| 5 | MISCELLANEOUS RECEIPTS | 77,280 | 20,000 | 20,000 | - | - | (20,000) | -100.0% |
| 6 | TRANSFER FROM GENERAL FUND | 3,037,800 | 3,173,600 | 4,617,600 | 5,720,400 | 5,720,400 | 2,546,800 | 80.2% |
| 7 | TRANSFER FROM CAPITAL ASSET RESERVE | - | - | 220,000 | - | - | - | 0.0% |
| 8 | TRANSFER FROM LODGING TAX | 443,995 | 500,000 | 500,000 | 500,000 | 500,000 | - | 0.0% |
| 9 | SUBTOTAL CAPITAL PROJECT FUNDING SOURCES | 4,359,667 | 4,642,500 | 8,662,900 | 10,144,900 | 10,144,900 | 5,502,400 | 118.5% |
10 TOTAL FUNDING SOURCES 4,359,667 4,642,500 8,662,900 10,144,900 10,144,900 5,502,400 118.5%
11 TOTAL BEGINNING BALANCE & FUNDING SOURCES 10,548,334 4,990,700 17,126,100 13,711,200 13,711,200 8,720,500 174.7%
12 EXPENDITURES
| 13 | FIRE | 371,760 | 566,600 | 614,400 | 569,500 | 569,500 | 2,900 | 0.5% |
| 14 | GROUNDS | 236,160 | 80,000 | 80,000 | 85,000 | 85,000 | 5,000 | 6.3% |
| 15 | RECREATION | 2,029,883 | 1,160,000 | 2,029,800 | 330,000 | 330,000 | (830,000) | -71.6% |
| 16 | LIFE SAFETY | - | - | - | 155,200 | - | - | 0.0% |
| 17 | CODE ENFORCEMENT | 42,369 | - | - | 135,000 | 135,000 | 135,000 | 0.0% |
| 18 | POLICE | 751,216 | 1,488,100 | 2,351,400 | 1,176,400 | 1,176,400 | (311,700) | -20.9% |
| 19 | STREETS | 801,746 | 415,800 | 2,973,100 | 3,130,000 | 2,870,000 | 2,454,200 | 590.2% |
| 20 | STORMWATER | 925,452 | - | 4,366,100 | 3,310,000 | 3,124,000 | 3,124,000 | 0.0% |
| 21 | INFORMATION TECHNOLOGY | 48,392 | 112,000 | 172,000 | 110,700 | 110,700 | (1,300) | -1.2% |
| 22 | FACILITIES MANAGEMENT | 76,249 | - | 83,000 | 474,000 | 474,000 | 474,000 | 0.0% |
| 23 | PROCUREMENT & INVENTORY | - | 820,000 | 890,000 | 125,000 | 517,000 | (303,000) | -37.0% |
| 24 | FLEET MAINTENANCE | 520,171 | - | - | 44,100 | 44,100 | 44,100 | 0.0% |
| 25 DEPARTMENT SUBTOTAL | 6,982,222 | 4,642,500 | 13,559,800 | 9,644,900 | 9,435,700 | 4,793,200 | 103.2% |
| 26 | BUDGET BALANCE | 3,566,112 | 348,200 | 3,566,300 | 4,066,300 | 4,275,500 | 3,927,300 | 1127.9% |
| 27 TOTAL BUDGET BALANCE & EXPENDITURES | 10,548,334 | 4,990,700 | 17,126,100 | 13,711,200 | 13,711,200 | 8,720,500 | 174.7% |
$ DIFFERENCE
| 2023/2024 | ORIGINAL | 2024/25 | 2025/2026 | 2025/2026 | FY26 VS | ||
|---|---|---|---|---|---|---|---|
| 28 RESERVE BALANCES | ACTUAL | APPROVED | PROJECTED | REQUESTED | RECOMMENDED | FY25 BUDGET | POLICY |
| 29 CAPITAL ASSET RESERVE | 1,653,050 | 1,524,900 | 1,524,900 | 1,404,700 | 1,404,700 | (120,200) Min $500K | |
| 30 PARKLAND/RECREATION | 400,000 | 105,300 | 105,300 | 100,000 | 100,000 | (5,300) | N/A |
34
Página 51
FY 2026 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
PROJECTED GENERAL FUND COST
PER CAPITA BY FUNCTION
Fiscal Year 2025-2026
| OTHER | $5.50 |
| TRANSFER TO CAPITAL… | $144.40 |
| INSURANCE | $31.44 |
| DEBT SERVICE | $16.38 |
| STREET LIGHTS | $21.75 |
| RETIREE PENSION… | $22.27 |
| RETIREE MEDICAL… | $5.24 |
| PUBLIC WORKS | $184.62 |
| FINANCIAL ADMINISTRATION | $121.91 |
| FIRE | $29.71 |
| POLICE | $672.32 |
| PLANNING & INSPECTIONS | $122.01 |
| LIBRARY, RECREATION &… | $105.52 |
| CITY ADMINISTRATION | |
|---|---|
| $79.96 | |
$0.00 $200.00 $400.00 $600.00 $800.00
Total per capita based on population estimate of 38,166* =
$1,357.73
*US Census estimate for 2020
35
Página 52
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
SANITATION FUND SUMMARY
2024/25 $ DIFFERENCE % CHG
2023/2024 ORIGINAL 2024/25 2025/2026 2025/2026 FY26 VS FY26 VS
ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED FY25 BUDGET FY25 VS
1 BEGINNING BALANCE - SANITATION - - - 331,800 - 331,800 0.0%
2 BASE REVENUE:
| 3 SANITATION SERVICES | 3,966,546 | 4,851,600 | 4,851,600 | 5,168,400 | 5,168,400 | 316,800 | 6.5% |
| 4 TOTAL REVENUES | 3,966,546 | 4,851,600 | 4,851,600 | 5,168,400 | 5,168,400 | 316,800 | 6.5% |
| 5 TOTAL BEGINNING BALANCE & REVENUES | 3,966,546 | 4,851,600 | 4,851,600 | 5,500,200 | 5,168,400 | 648,600 | 6.5% |
6 DIRECT EXPENSES:
| 7 SANITATION OPERATING | 2,641,982 | 3,140,600 | 3,140,600 | 3,288,500 | 3,268,500 | 147,900 | 4.1% |
| 8 DIRECT EXPENDITURE SUBTOTAL | 2,641,982 | 3,140,600 | 3,140,600 | 3,288,500 | 3,268,500 | 147,900 | 4.1% |
| 9 OTHER EXPENSES: | |||||||
|---|---|---|---|---|---|---|---|
| 10 INTERFUND SERVICE FEES | - | 500,200 | 500,200 | 617,600 | 615,800 | 117,400 | 23.1% |
| 11 OTHER EXPENSES SUBTOTAL | - | 500,200 | 500,200 | 617,600 | 615,800 | 117,400 | 23.1% |
| 12 TRANSFER TO: | |||||||
| 13 SANITATION IMP AND EXT | - | 739,000 | 1,191,000 | 735,000 | 735,000 | (4,000) | -0.5% |
| 14 CONTINGENCY RESERVE | - | 140,000 | 140,000 | - | - | (140,000) -100.0% | |
| 15 TRANSFER TO SUBTOTAL | - | 879,000 | 1,331,000 | 735,000 | 735,000 | (144,000) -16.4% | |
| 16 TOTAL EXPENSES | 2,641,982 | 4,519,800 | 4,971,800 | 4,641,100 | 4,619,300 | 121,300 | 2.2% |
| 17 BUDGET BALANCE | - | 331,800 | 331,800 | 859,100 | 549,100 | 121,300 | 65.5% |
| 18 TOTAL BUDGET BALANCES & EXPENSES | 2,641,982 | 4,851,600 | 5,303,600 | 5,500,200 | 5,168,400 | 242,600 | 6.5% |
2024/25 $ DIFFERENCE 2023/2024 ORIGINAL 2024/25 2025/2026 2025/2026 FY26 VS 19 RESERVE BALANCES ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED FY25 BUDGET POLICY 20 CONTINGENCY - 140,000 140,000 140,000 140,000 - $0
36
Página 53
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
SANITATION IMPROVEMENT & EXTENSION FUND SUMMARY
2024/25 $ DIFFERENCE % CHG
2023/2024 ORIGINAL 2024/25 2025/2026 2025/2026 FY25 VS FY25 VS ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED FY25 BUDGET fy25 VS
| 1 | BEGINNING BALANCE | - | - | 207,000 | - | - | - | 0.0% |
| 2 | TOTAL BEGINNING BALANCES | - | - | 207,000 | - | - | - | 0.0% |
| 3 | REVENUES | |||||||
| 4 | LOANS | - | - | 245,000 | - | - | - | 0.0% |
| 5 | TRANS FR OPERATING FUND | 982,109 | 739,000 | 739,000 | 735,000 | 735,000 | (4,000) | -0.5% |
| 6 | TOTAL BEGINNING BALANCES & REVENUES | 982,109 | 739,000 | 1,191,000 | 735,000 | 735,000 | (4,000) | -0.5% |
| 7 | EXPENSES | |||||||
| 8 | TRUCKS | 982,109 | 739,000 | 1,191,000 | 735,000 | 735,000 | (4,000) | -0.5% |
| 9 | TOTAL EXPENSES | 982,109 | 739,000 | 1,191,000 | 735,000 | 735,000 | (4,000) | -0.5% |
10 BUDGET BALANCES - - - - - - 0.0%
11 TOTAL BUDGET BALANCES & EXPENSES 982,109 739,000 1,191,000 735,000 735,000 (4,000) -0.5%
| 2024/25 | $ DIFFERENCE | |||||||
|---|---|---|---|---|---|---|---|---|
| 2023/2024 | ORIGINAL | 2024/25 | 2025/2026 | 2025/2026 | FY25 VS | |||
| 12 | RESERVE BALANCES | ACTUAL | APPROVED | PROJECTED | REQUESTED | RECOMMENDED | FY25 BUDGET | POLICY |
| 13 | CAPITAL ASSET RESERVE | - | - | - | - | - | - | $0 |
37
Página 54
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WATER FUND SUMMARY 2024/25 $ DIFFERENCE % CHG 2023/2024 ORIGINAL 2024/25 2025/2026 2025/2026 2025/2026 FY26 VS FY26 VS ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY25 BUDGET FY25 VS
1 BEGINNING BALANCE - WATER 2,012,500 1,536,000 1,754,600 1,295,000 1,295,000 1,295,000 (241,000) -15.7%
| 2 | BASE REVENUE: | ||||||||
| 3 | WATER SERVICES | 6,544,591 | 6,566,900 | 6,566,900 | 7,568,500 | 7,568,500 | 7,568,500 | 1,001,600 | 15.3% |
| 4 | WATER TANK SPACE LEASING | 423,588 | 450,500 | 450,500 | 464,000 | 464,000 | 464,000 | 13,500 | 3.0% |
| 5 | WATER IMPACT FEES | 353,484 | 230,000 | 230,000 | 250,000 | 250,000 | 250,000 | 20,000 | 8.7% |
| 6 | INTEREST - WATER | 266,880 | 100,000 | 100,000 | 150,000 | 150,000 | 150,000 | 50,000 | 50.0% |
| 7 | MISCELLANEOUS SERVICE FEE | 42,955 | 65,200 | 65,200 | 65,400 | 65,400 | 65,400 | 200 | 0.3% |
| 8 | TOTAL REVENUES | 7,679,298 | 7,430,100 | 7,430,100 | 8,497,900 | 8,497,900 | 8,497,900 | 1,067,800 | 14.4% |
9 TOTAL BEGINNING BALANCE & REVENUES 9,691,798 8,966,100 9,184,700 9,792,900 9,792,900 9,792,900 279,900 9.2%
10 DIRECT EXPENSES:
| 11 | ENGINEERING & INSPECTION | 298,146 | 425,700 | 425,700 | 416,600 | 416,600 | 416,600 | (9,100) | -2.1% |
| 12 | WATER MAINTENANCE | 765,276 | 881,300 | 881,300 | 967,200 | 967,200 | 967,200 | 85,900 | 9.7% |
| 13 | WATER TREATMENT PLANT | 2,713,454 | 3,201,500 | 3,201,500 | 3,097,400 | 3,097,400 | 3,097,400 | (104,100) | -3.3% |
| 14 DIRECT EXPENDITURE SUBTOTAL | 3,776,876 | 4,508,500 | 4,508,500 | 4,481,200 | 4,481,200 | 4,481,200 | (27,300) | -0.6% | |
| 15 OTHER EXPENSES: | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| 16 | DEBT SERVICE - WATER | 770,997 | 695,600 | 695,600 | 543,000 | 543,000 | 543,000 | (152,600) | -21.9% |
| 17 | OTHER EMPLOYMENT EXPENSES | - | 109,500 | 109,500 | - | - | - | (109,500) | -100.0% |
| 18 | INTERFUND SERVICE FEES | 1,095,767 | 1,023,100 | 1,023,100 | 750,900 | 750,900 | 750,900 | (272,200) | -26.6% |
| 19 | BANK & CREDIT CARD FEES | - | 20,000 | 20,000 | 25,000 | 25,000 | 25,000 | 5,000 | 25.0% |
| 20 OTHER EXPENSES SUBTOTAL | 2,093,664 | 1,848,200 | 1,848,200 | 1,318,900 | 1,318,900 | 1,318,900 | (529,300) | -28.6% | |
| 21 TRANSFER TO: | |||||||||
| 22 | GENERAL FUND FROM WATER | 500,000 | 1,000,000 | 1,000,000 | 1,000,000 | 1,000,000 | 1,000,000 | - | 0.0% |
| 23 | WATER IMP AND EXT | 1,536,700 | 503,000 | 503,000 | 1,280,600 | 1,280,600 | 1,280,600 | 777,600 | 154.6% |
| 24 | ELECTRIC FUND (ERP) | 25,000 | 25,000 | 25,000 | 25,000 | 25,000 | 25,000 | - | 0.0% |
| 25 | TRANSFER TO INVENTORY WRITE-OFFS | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | 5,000 | - | 0.0% |
| 26 TRANSFER TO SUBTOTAL | 2,066,700 | 1,533,000 | 1,533,000 | 2,310,600 | 2,310,600 | 2,310,600 | 777,600 | 50.7% | |
| 27 TOTAL EXPENSES | 7,937,240 | 7,889,700 | 7,889,700 | 8,110,700 | 8,110,700 | 8,110,700 | 221,000 | 2.8% | |
28 BUDGET BALANCE WATER 1,754,558 1,076,400 1,295,000 1,682,200 1,682,200 1,682,200 605,800 56.3%
| 29 TOTAL BUDGET BALANCES & EXPENSES | 9,691,798 | 8,966,100 | 9,184,700 | 9,792,900 | 9,792,900 | 9,792,900 | 826,800 | 9.2% |
| 30 EXCEEDS/(REMAINS)TO MEET REQMNT | 833,100 | 184,800 | 403,400 | 662,500 | 662,500 | 662,500 |
2024/25 $ DIFFERENCE 2023/2024 ORIGINAL 2024/25 2025/2026 2025/2026 2025/2026 FY26 VS 31 RESERVE BALANCES ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED APPROVED FY25 BUDGET POLICY
32 CONTINGENCY - WATER 314,681 317,700 326,700 336,700 336,700 336,700 19,000 $250K
38
Página 55
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WATER IMPROVEMENT & EXTENSION FUND SUMMARY
2024/25 $ DIFFERENCE % CHG
2023/2024 ORIGINAL 2024/25 2025/2026 2025/2026 FY25 VS FY25 VS ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED FY25 BUDGET fy25 VS
1 BEGINNING BALANCE - WATER 8,250,800 1,900,100 4,317,800 93,500 93,500 (1,806,600) -95.1%
| 2 | REVENUES | |||||||
| 3 | STATE LOAN FUND - WATER | - | - | - | 2,217,500 | 2,217,500 | 2,217,500 | 0.0% |
| 4 | TRANS FR OPERATING FUND - WATER | 1,536,700 | 503,000 | 503,000 | 1,280,600 | 1,280,600 | 777,600 | 154.6% |
| 5 | TRANSFER FR WATER IMPACT FEE | - | - | - | 282,500 | 282,500 | 282,500 | 0.0% |
| 6 | FEDERAL/STATE GRANTS | 972,600 | 2,009,000 | 4,018,000 | 5,000,000 | 5,000,000 | 2,991,000 | 148.9% |
| 7 | INTEREST INCOME | 78,261 | 50,000 | 50,000 | 50,000 | 50,000 | - | 0.0% |
| 8 | MISCELLANEOUS RECEIPTS | - | - | 75,100 | - | - | - | 0.0% |
| 9 | TOTAL REVENUES | 2,587,561 | 2,562,000 | 4,646,100 | 8,830,600 | 8,830,600 | 6,268,600 | 244.7% |
10 TOTAL BEGINNING BALANCES & REVENUES 10,838,361 4,462,100 8,963,900 8,924,100 8,924,100 2,731,400 100.0%
| 11 | EXPENSES | |||||||
| 12 | ENGINEERING & INSPECTION | 41,322 | 26,900 | 26,900 | - | - | (26,900) | -100.0% |
| 13 | WATER MAINTENANCE | 2,059,817 | 3,456,700 | 7,886,700 | 3,098,600 | 3,037,600 | (358,100) | -12.1% |
| 14 | WATER TREATMENT PLANT | 132,187 | 885,000 | 956,800 | 5,682,000 | 5,682,000 | 4,797,000 | 542.0% |
| 15 | TOTAL EXPENSES | 2,233,326 | 4,368,600 | 8,870,400 | 8,780,600 | 8,719,600 | 4,412,000 | 99.6% |
16 TOTAL ENDING BUDGET BALANCES 8,605,036 2,680,700 93,500 143,500 204,500 (2,537,200) -92.4%
17 TOTAL BUDGET BALANCES & EXPENSES 10,838,361 7,049,300 8,963,900 8,924,100 8,924,100 1,874,800 26.6%
| 2024/25 | $ DIFFERENCE | ||||||
|---|---|---|---|---|---|---|---|
| 2023/2024 | ORIGINAL | 2024/25 | 2025/2026 | 2025/2026 | FY25 VS | ||
| 18 | RESERVE BALANCES | ACTUAL | APPROVED PROJECTED REQUESTED | RECOMMENDED | FY25 BUDGET | POLICY | |
| 19 | CAPITAL ASSET RESERVE-WATER | 596,188 | 601,500 | 616,200 | 636,200 | 636,200 | 34,700 MIN $500K |
| 20 | IMPACT FEE RESERVE - WATER | 2,012,713 | 1,815,200 2,082,713 | 2,132,713 | 2,132,713 | 317,513 20% of Rev. |
39
Página 56
FY 2026 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Fiscal Year 2025/2026
Water Fund
Revenue
IMPACT FEES
3%
WATER TANK
SPACE LEASING
5%
MISCELLANEOUS
SERVICE FEE
3%
WATER SERVICES 89%
40
Página 57
FY 2026 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
2025/2026 Budget
Water Fund Expenses
By Major Function
TRANSFER TO
| GENERAL FUND | TRANSFER TO | |
|---|---|---|
| INTRAFUND | 12.3% | CAPITAL PROJECTS |
| SERVICE FEES | 15.8% | |
| 9.6% | ||
CAPITAL ASSET RESERVE WATER 0.1%
DEBT SERVICE 6.7%
ELECTRIC FUND (ERP) 0.3%
ENGINEERING & INSPECTION 5.1%
WATER TREATMENT
PLANT
38.2% WATER
DEPARTMENT
11.9%
41
Página 58
FY 2026 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
2025/2026 Budget
Water Fund Expenses
By Expense Category
TRANSFER TO
GENERAL FUND
12.8%
INTRAFUND
| SERVICE FEES | TRANSFER TO |
|---|---|
| 9.6% | CAPITAL PROJECTS |
| 16.5% | |
DEBT SERVICE 7.0%
ADMINISTRATIVE
EXPENSES
11.6% MISCELLANEOUS
EXPENSES
0.7%
MATERIALS &
| SUPPLIES | PERSONNEL |
|---|---|
| 6.4% | SERVICES |
| 35.3% | |
42
Página 59
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WASTEWATER FUND SUMMARY
2024/25 $ DIFFERENCE % CHG
2023/2024 ORIGINAL 2024/25 2025/2026 2025/2026 FY26 VS FY26 VS
ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED FY25 BUDGET FY25 VS
1 BEGINNING BALANCE - WASTEWATER 2,360,100 3,942,400 3,942,400 3,507,000 3,507,000 (435,400) -11.0%
2 BASE REVENUE:
| 3 WASTEWATER SERVICES | 4,672,371 | 4,193,600 | 4,193,600 | 5,131,300 | 5,131,300 | 937,700 | 22.4% |
| 4 WASTEWATER TREATMENT SERVICES | 3,369,660 | 3,672,600 | 3,672,600 | 4,775,400 | 4,775,400 | 1,102,800 | 30.0% |
| 5 GROUNDWATER INFLOW ADJUSTMENT | 2,180,803 | 1,977,400 | 1,977,400 | 2,369,800 | 2,369,800 | 392,400 | 19.8% |
| 6 WASTEWATER IMPACT FEES | 312,451 | 230,000 | 230,000 | 235,000 | 235,000 | 5,000 | 2.2% |
| 7 INTEREST - WASTEWATER | 298,597 | 100,000 | 100,000 | 200,000 | 200,000 | 100,000 | 100.0% |
| 8 MISCELLANEOUS SERVICE FEE | 25,243 | 50,200 | 50,200 | 200 | 200 | (50,000) | -99.6% |
| 9 TOTAL REVENUES | 10,909,125 | 10,223,800 | 10,223,800 | 12,711,700 | 12,711,700 | 2,487,900 | 24.3% |
- •0.0% 10 DIRECT EXPENSES: 11 ENGINEERING & INSPECTION 160,049 382,000 382,000 516,200 519,900 134,200 36.1% 12 WASTEWATER MAINTENANCE 1,311,525 1,369,000 1,369,000 1,524,400 1,524,400 155,400 11.4% 13 DIRECT EXPENDITURE SUBTOTAL 1,471,573 1,751,000 1,751,000 2,040,600 2,044,300 289,600 16.8% 14 OTHER EXPENSES: 15 DEBT SERVICE - WASTEWATER 664,587 614,200 614,200 644,000 644,000 29,800 4.9% 16 KENT COUNTY TREATMENT CHARGE 4,828,325 5,198,600 5,198,600 5,822,500 5,822,500 623,900 12.0% 17 INTERFUND SERVICE FEES 841,741 724,900 724,900 942,400 935,200 217,500 29.0% 18 BANK & CREDIT CARD FEES - 6,000 6,000 6,000 6,000 - 0.0% 19 OTHER EXPENSES SUBTOTAL 6,444,653 6,548,300 6,548,300 7,414,900 7,407,700 866,600 13.1% 20 TRANSFER TO: 21 GENERAL FUND FROM WASTEWATER 500,000 1,000,000 1,000,000 1,000,000 1,000,000 - 0.0% 22 WASTEWATER IMP AND EXT 2,270,900 1,329,900 1,329,900 2,694,900 2,694,900 1,365,000 102.6% 23 ELETRIC FUND (ERP) 25,000 25,000 25,000 25,000 25,000 - 0.0% 24 TRANSFER TO INVENTORY WRITE-OFFS 5,000 5,000 5,000 5,000 5,000 - 0.0% 25 TRANSFER TO SUBTOTAL 3,021,010 2,359,900 2,359,900 3,724,900 3,724,900 1,365,000 57.8% 26 TOTAL EXPENSES 10,937,237 10,659,200 10,659,200 13,180,400 13,176,900 2,521,200 23.6%
27 BUDGET BALANCE WASTEWATER 2,331,989 3,507,000 3,507,000 3,038,300 3,041,800 (468,700) -13.3%
| 28 TOTAL BUDGET BALANCES & EXPENSES | 13,269,225 | 14,166,200 | 14,166,200 | 16,218,700 | 16,218,700 | 2,052,501 | 14.5% |
| 29 EXCEEDS/(REMAINS)TO MEET REQMNT | 1,030,389 | 2,271,200 | 2,283,200 | 1,512,900 | 1,516,400 |
2024/25 $ DIFFERENCE 2023/2024 ORIGINAL 2024/25 2025/2026 2025/2026 FY26 VS 30 RESERVE BALANCES ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED FY25 BUDGET POLICY 31 CONTINGENCY - WASTEWATER 314,681 317,800 326,700 338,700 338,700 20,900 $250K
43
Página 60
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WASTEWATER IMPROVEMENT & EXTENSION FUND SUMMARY
2024/25 $ DIFFERENCE % CHG
2023/2024 ORIGINAL 2024/25 2025/2026 2025/2026 FY25 VS FY25 VS ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED FY25 BUDGET fy25 VS
| 1 | BEGINNING BALANCE - WASTEWATER | 2,219,300 | 767,900 | 3,760,100 | 787,100 | 787,100 | 19,200 | 2.5% |
| 2 | TOTAL BEGINNING BALANCES | 2,219,300 | 767,900 | 3,760,100 | 787,100 | 787,100 | 19,200 | 2.5% |
| 3 | REVENUES | |||||||
| 4 | TRANS FR OPERATING FUND - WW | 2,270,900 | 1,329,900 | 1,329,900 | 2,694,900 | 2,694,900 | 1,365,000 | 102.6% |
| 5 | TRANSFER FR WASTEWATER IMPACT FEE | - | 7,200 | 287,200 | 7,200 | 7,200 | - | 0.0% |
| 7 | INTEREST INCOME | 26,700 | 20,000 | 20,000 | 50,000 | 50,000 | 30,000 | 150.0% |
| 8 | EXPENSES | |||||||
| 9 | ENGINEERING & INSPECTION | - | 116 | - | - | - | (116) | -100.0% |
| 10 | WASTEWATER MAINTENANCE | 872,182 | 1,691,100 | 5,064,100 | 2,702,100 | 2,702,100 | 1,011,000 | 59.8% |
| 11 | YEAR END ADJUSTMENT | - | - | - | - | - | - | 0.0% |
| TRANSFER TO IMPACT FEE RESV - WW | - | - | - | - | - | - | 0.0% | |
| 12 | TOTAL EXPENSES | 872,182 | 1,691,216 | 5,064,100 | 2,702,100 | 2,702,100 | 1,010,884 | 59.8% |
13 TOTAL ENDING BUDGET BALANCES 3,976,918 787,784 787,100 837,100 837,100 49,316 6.3%
14 TOTAL BUDGET BALANCES & EXPENSES 4,849,100 2,479,000 5,851,200 3,539,200 3,539,200 1,060,200 42.8%
| 2024/25 | $ DIFFERENCE | ||||||
|---|---|---|---|---|---|---|---|
| 2023/2024 | ORIGINAL | 2024/25 | 2025/2026 | 2025/2026 | FY25 VS | ||
| 15 | RESERVE BALANCES | ACTUAL | APPROVED PROJECTED REQUESTED | RECOMMENDED | FY25 BUDGET | POLICY | |
| 16 | CAPITAL ASSET RESERVE-WASTEWATER | 594,824 | 601,500 | 614,800 | 634,800 | 634,800 | 33,300 MIN $500K |
| 17 | IMPACT FEE RESERVE - WASTEWATER | 5,864,589 | 5,142,900 6,064,600 | 6,264,600 | 6,264,600 | 1,121,700 20% of Rev. |
44
Página 61
FY 2026 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Fiscal Year 2025/2026
Wastewater Fund
Revenue
IMPACT FEES MISCELLANEOUS
GROUNDWATER SERVICE FEE
1.8%
INFLOW 1.6%
ADJUSTMENT
18.6%
WASTEWATER
SERVICES
WASTEWATER
40.4%
TREATMENT
SERVICES
37.6%
45
Página 62
FY25 ANNUAL OPERATING BUDGT _ DOVER, DELAWARE
FY 2026 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
2025/2026 Budget
Wastewater Fund Expenses
By Major Function
TRANSFER TO
GENERAL FUND
| 7.6% | TRANSFER TO |
| INTRAFUND | CAPITAL PROJECTS |
| SERVICE FEES | 20.5% |
| 7.1% | |
|---|---|
MISCELLANEOUS EXPENSES 0.2%
KENT COUNTY TREATMENT FEES 44.2%
ENGINEERING & INSPECTION 3.9%
DEBT SERVICE
WASTEWATER
4.9%
DEPARTMENT
11.6%
46
Página 63
FY25 ANNUAL OPERATING BUDGT _ DOVER, DELAWARE
FY 2026 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
2025/2026 Budget
Wastewater Fund Expenses
By Expense Category
TRANSFER TO
TRANSFER TO
GENERAL FUND
INTRAFUND 7.8% CAPITAL PROJECTS
21.1%
SERVICE FEES
7.4%
MISCELLANEOUS EXPENSES 0.2%
PERSONNEL SERVICES 9.0%
MATERIALS &
SUPPLIES
1.1%
KENT COUNTY
TREATMENT FEES
45.5% ADMINISTRATIVE
EXPENSES
2.8%
DEBT SERVICE 5.0%
47
Página 64
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
ELECTRIC REVENUE FUND SUMMARY
| 2024/25 | $ DIFFERENCE | % CHG | |||||||
|---|---|---|---|---|---|---|---|---|---|
| 2023/2024 | ORIGINAL | 2024/25 | 2025/2026 | 2025/2026 | 2025/2026 | FY25 VS | FY25 VS | ||
| ACTUAL | APPROVED | PROJECTED | REQUESTED | RECOMMENDED | APPROVED | FY25 BUDGET | fy25 VS | ||
| 1 | BEGINNING BALANCE | 35,750,600 | 46,148,500 | 54,257,400 | 48,251,000 | 48,251,000 | 48,251,000 | 2,102,500 | 4.6% |
| 2 | DISTRIBUTION OF EARNINGS - PCA CREDIT | - | (7,100,000) | (7,100,000) | - | - | - | 7,100,000 | -100.0% |
| 3 | BEGINNING BALANCE - ADJUSTED | 35,750,600 | 39,048,500 | 47,157,400 | 48,251,000 | 48,251,000 | 48,251,000 | 9,202,500 | 23.6% |
| 4 | BASE REVENUE: | ||||||||
| 5 | DIRECT SALES TO CUSTOMER | 85,003,308 | 91,131,200 | 91,131,200 | 101,796,900 | 101,796,900 | 101,796,900 | 10,665,700 | 11.7% |
| 6 | UTILITY TAX | 1,365,916 | 1,356,100 | 1,356,100 | 1,348,500 | 1,348,500 | 1,348,500 | (7,600) | -0.6% |
| 7 | MISCELLANEOUS REVENUE | 2,148,041 | 608,000 | 608,000 | 700,000 | 700,000 | 700,000 | 92,000 | 15.1% |
| 8 | RENT REVENUE | 126,517 | 136,000 | 136,000 | 135,000 | 135,000 | 135,000 | (1,000) | -0.7% |
| 9 | GREEN ENERGY | 127,881 | 135,000 | 135,000 | 135,000 | 135,000 | 135,000 | - | 0.0% |
| 10 | INTEREST EARNINGS | 202,292 | 1,500,000 | 500,000 | 400,000 | 400,000 | 400,000 | (1,100,000) | -73.3% |
| 12 | TRANSFER FROM UNCOLLECTIBLE RSRV | 75,000 | 75,000 | 75,000 | 75,000 | 75,000 | 75,000 | - | 0.0% |
| 13 | TOTAL REVENUES | 89,108,544 | 94,941,300 | 96,903,100 | 104,590,400 | 104,590,400 | 104,590,400 | 9,649,100 | 10.2% |
| 14 | TOTAL BEGINNING BALANCE & REVENUES | 124,859,144 | 133,989,800 | 144,060,500 | 152,841,400 | 152,841,400 | 152,841,400 | 18,851,600 | 14.1% |
| - 0.0% | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| 15 | EXPENSES: | ||||||||
| 16 | POWER SUPPLY | 23,246,439 | 24,945,600 | 24,945,600 | 26,631,500 | 26,631,500 | 26,631,500 | 1,685,900 | 6.8% |
| 17 | DOVER SUN PARK ENERGY | 2,765,102 | 3,700,800 | 3,700,800 | 3,361,200 | 3,361,200 | 3,361,200 | (339,600) | -9.2% |
| 18 | SOLAR RENEWAL ENERGY CREDITS | 360,223 | 381,900 | 381,900 | 375,100 | 375,100 | 375,100 | (6,800) | -1.8% |
| 19 | POWER SUPPLY MANAGEMENT | 674,792 | 701,800 | 701,800 | 729,900 | 729,900 | 729,900 | 28,100 | 4.0% |
| 20 | REC'S (Renewable Energy Credits) | - | 6,429,200 | 6,429,200 | 6,465,100 | 6,465,100 | 6,465,100 | 35,900 | 0.6% |
| 21 | RGGI | - | 70,500 | 70,500 | 87,500 | 87,500 | 87,500 | 17,000 | 24.1% |
| 22 | PJM CHARGES - ENERGY | (304,046) | 11,932,000 | 11,932,000 | 12,675,700 | 12,675,700 | 12,675,700 | 743,700 | 6.2% |
| 23 | PJM CHARGES - TRANSMISSION & FEES | 11,293,607 | 13,645,200 | 13,645,200 | 17,001,700 | 17,001,700 | 17,001,700 | 3,356,500 | 24.6% |
| 24 | CAPACITY CHARGES | 8,297,976 | 23,451,800 | 9,920,500 | 22,291,100 | 22,291,100 | 22,291,100 | (1,160,700) | -4.9% |
| 25 | SUB-TOTAL POWER SUPPLY | 46,334,093 | 85,258,800 | 71,727,500 | 89,618,800 | 89,618,800 | 89,618,800 | 4,360,000 | 5.1% |
| 26 | PLANT OPERATIONS | 2,121,536 | 2,296,800 | 2,296,800 | 2,239,600 | 2,239,600 | 2,239,600 | (57,200) | -2.5% |
| 27 | GENERATIONS FUELS | 29,412 | 191,300 | 191,300 | 28,500 | 28,500 | 28,500 | (162,800) | -85.1% |
| 28 | PJM SPOT MARKET ENERGY | (112,347) | (147,000) | (147,000) | (108,300) | (108,300) | (108,300) | 38,700 | -26.3% |
| 29 | PJM CREDITS | (1,026,515) | (262,800) | (262,800) | (188,000) | (188,000) | (188,000) | 74,800 | -28.5% |
| 30 | CAPACITY CREDITS | (2,779,711) | (10,404,300) | (10,404,300) | (9,336,100) | (9,336,100) | (9,336,100) | 1,068,200 | -10.3% |
| 31 | GENERATION SUBTOTAL | (1,767,625) | (8,326,000) | (8,326,000) | (7,364,300) | (7,364,300) | (7,364,300) | 961,700 | -11.6% |
| 32 | POWER SUPPLY & GENERATION SUBTOTAL | 44,566,468 | 76,932,800 | 63,401,500 | 82,254,500 | 82,254,500 | 82,254,500 | 5,321,700 | 6.9% |
| 33 | DIRECT EXPENDITURES | ||||||||
| 34 | TRANSMISSION/DISTRIBUTION | 4,886,611 | 5,205,100 | 5,205,100 | 5,736,800 | 5,736,800 | 5,736,800 | 531,700 | 10.2% |
| 35 | ELECTRICAL ENGINEERING | 1,700,148 | 1,937,000 | 1,937,000 | 2,052,000 | 2,052,000 | 2,052,000 | 115,000 | 5.9% |
| 36 | ADMINISTRATION | 900,452 | 1,129,100 | 1,129,100 | 1,155,700 | 1,155,900 | 1,155,900 | 26,600 | 2.4% |
| 37 | METER READING | 553,085 | 529,800 | 529,800 | 569,400 | 569,400 | 569,400 | 39,600 | 7.5% |
| 38 | SYSTEMS OPERATIONS | 960,121 | 1,067,500 | 1,067,500 | 1,159,400 | 1,159,400 | 1,159,400 | 91,900 | 8.6% |
| 39 | DIRECT EXPENDITURE SUBTOTALS | 9,000,417 | 9,868,500 | 9,868,500 | 10,673,300 | 10,673,500 | 10,673,500 | 804,800 | 8.2% |
| 40 | OTHER EXPENSES: | ||||||||
| 41 | UTILITY TAX | 1,365,916 | 1,356,100 | 1,356,100 | 1,348,500 | 1,348,500 | 1,348,500 | (7,600) | -0.6% |
| 42 | ALLOW FOR UNCOLLECTIBLES | 300,000 | 300,000 | 300,000 | 100,000 | 100,000 | 100,000 | (200,000) | -66.7% |
| 43 | CONTRACTUAL SERVICES - RFP'S | 960 | 50,000 | 50,000 | 50,000 | 50,000 | 50,000 | - | 0.0% |
| 44 | LEGAL EXPENSES | 41,250 | 50,000 | 50,000 | 50,000 | 50,000 | 50,000 | - | 0.0% |
| 45 | INTERFUND SERVICE FEES | 4,086,966 | 4,371,600 | 4,868,200 | 4,824,300 | 5,123,800 | 5,123,800 | 452,700 | 17.2% |
| 46 | INTEREST ON DEPOSITS | 20,512 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | - | 0.0% |
| 47 | BANK & CREDIT CARD FEES | 616,091 | 619,300 | 619,300 | 650,000 | 650,000 | 650,000 | 30,700 | 5.0% |
| 48 | DEBT SERVICE | 1,378,255 | 1,441,900 | 1,441,900 | 1,376,300 | 1,376,300 | 1,376,300 | (65,600) | -4.5% |
| 49 | STORM EXPENSE | - | 150,000 | 150,000 | 150,000 | 150,000 | 150,000 | - | 0.0% |
| 50 | OTHER EXPENSES SUBTOTAL | 8,806,948 | 9,447,900 | 9,944,500 | 8,569,100 | 8,868,600 | 8,868,600 | (878,800) | -6.1% |
| 51 | TRANSFER TO: | ||||||||
| 52 | IMPROVEMENT & EXTENSION | - | - | - | 17,738,300 | 10,538,300 | 10,538,300 | 17,738,300 | 0.0% |
| 53 | GENERAL FUND | 8,000,000 | 10,000,000 | 12,465,000 | 10,000,000 | 10,000,000 | 10,000,000 | - | 0.0% |
| 54 | TRANSFER TO 'OTHER' RESERVE | 127,881 | 30,000 | 30,000 | 135,000 | 135,000 | 135,000 | 105,000 | 350.0% |
| 55 | TRANSFER TO INVENTORY WRITE-OFFS | 100,000 | 100,000 | 100,000 | 100,000 | 100,000 | 100,000 | - | 0.0% |
| 56 | TRANSFER TO SUBTOTAL | 8,227,881 | 10,130,000 | 12,595,000 | 27,973,300 | 20,773,300 | 20,773,300 | 17,843,300 | 105.1% |
| 57 | TOTAL EXPENSES | 70,601,715 | 106,379,200 | 95,809,500 | 129,470,200 | 122,569,900 | 122,569,900 | 23,091,000 | 15.2% |
58 BUDGET BALANCE - WORKING CAPITAL 54,257,430 27,610,600 48,251,000 23,371,200 30,271,500 30,271,500 (4,239,400) 9.6%
| 59 | TOTAL BUDGET BALANCE & EXPENSES | 124,859,144 | 133,989,800 | 144,060,500 | 152,841,400 | 152,841,400 | 152,841,400 | 18,851,600 | 14.1% |
| 60 | EXCEEDS/(REMAINS)TO MEET REQUIREMENT | 43,744,430 | 16,226,600 | 36,987,000 | 10,829,400 | 17,729,700 | 17,729,700 |
| 2024/25 | $ DIFFERENCE | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| 2023/2024 | ORIGINAL | 2024/25 | 2025/2026 | 2025/2026 | 2025/2026 | FY25 VS | |||
| 61 | RESERVE BALANCES | ACTUAL | APPROVED | PROJECTED | REQUESTED | RECOMMENDED | APPROVED | FY25 BUDGET | POLICY |
| 62 | CONTINGENCY RESERVE | 975,374 | 979,300 | 1,012,400 | 1,047,400 | 1,047,400 | 1,047,400 | 68,100 | $750K |
| 63 | INSURANCE RESERVE | 856,153 | 862,500 | 888,200 | 918,200 | 918,200 | 918,200 | 55,700 | $750K |
| 64 | RATE STABILIZATION RESERVE | 9,444,556 | 10,424,400 | 9,804,556 | 10,164,556 | 10,164,556 | 10,164,556 | (259,844) 10% - 20% |
48
Página 65
FY 2026 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Electric Fund
Fiscal Year 2025/2026
Revenue
DIRECT SALES TO
CUSTOMER
97.3%
UTILITY TAX
1.3%
MISCELLANEOUS
REVENUE
1.4%
49
Página 66
FY 2026 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Electric Fund
Fiscal Year 2025/2026
Expense by Major Function
ENGINEERING
ADMINISTRATION
1.7%
0.9%
T&D
4.7% METER READING
0.5%
SYSTEMS OPERATIONS 0.9%
TRANSFER TO GENERAL FUND 8.2%
TRANSFER TO CAPITAL PROJECTS 8.6%
INTERFUND
SERVICE FEES
4.2%
POWER SUPPLY &
GENERATION
67.1% DEBT SERVICE
1.1%
MISCELLANEOUS STATE UTILITY EXPENSES TAXES 1.0% 1.1%
50
Página 67
FY 2026 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
Electric Fund
Fiscal Year 2025/2026
Expense by Category
POWER SUPPLY & GENERATION 73.4%
ADMINISTRATIVE EXPENSES 1.4%
MATERIALS &
| SUPPLIES | TRANSFER TO |
|---|---|
| 0.8% | GENERAL FUND |
| 8.9% | |
PERSONNEL SERVICES
| 7.3% | INTERFUND |
| SERVICE FEES | |
|---|---|
| DEBT SERVICE | |
| 4.6% | |
| MISCELLANEOUS | 1.2% |
| EXPENSES | |
| 1.1% | |
| RETIREE MEDICAL | |
| CONTRIBUTIONS | |
| STATE UTILITY | |
| 0.0% | |
| TAXES | |
| 1.2% | |
51
Página 68
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
ELECTRIC IMPROVEMENT & EXTENSION FUND SUMMARY
2024/25 $ DIFFERENCE % CHG
2023/2024 ORIGINAL 2024/25 2025/2026 2025/2026 FY25 VS FY25 VS ACTUAL APPROVED PROJECTED REQUESTED RECOMMENDED FY25 BUDGET fy25 VS
1 BEGINNING BALANCE 24,439,400 33,165,000 19,464,374 7,761,874 7,761,874 (25,403,126) -76.6%
| 2 | REVENUES | |||||||
| 3 | TRANSFER FROM ELECTRIC | - | - | - | 17,738,300 | 10,538,300 | 17,738,300 | 0.0% |
| 4 | STATE GRANTS | 924,661 | - | - | - | - | - | 0.0% |
| 5 | GENERAL SERVICE BILLING | 1,328,019 | 1,000,000 | 1,000,000 | 200,000 | 200,000 | (800,000) | -80.0% |
| 6 | TRF FROM FUTURE CAPACITY | - | 2,000,000 | 2,000,000 | - | - | (2,000,000) | -100.0% |
| 7 | TOTAL REVENUES | 2,416,014 | 3,000,000 | 3,000,000 | 17,938,300 | 10,738,300 | 14,938,300 | 257.9% |
8 TOTALS 26,855,414 36,165,000 22,464,374 25,700,174 18,500,174 (10,464,826) -48.8%
| 9 | EXPENSES | |||||||
| 10 | ELECTRIC ADMINISTRATION | 1,437,500 | - | 1,078,600 | 60,000 | 60,000 | 60,000 | 0.0% |
| 11 | ELECTRIC GENERATION | 6,340,419 | 470,000 | 2,233,000 | 460,000 | 460,000 | (10,000) | -2.1% |
| 12 | TRANSMISSION AND DISTRIBUTION | 2,060,304 | 3,090,000 | 3,905,400 | 2,600,000 | 2,400,000 | (490,000) | -22.3% |
| 13 | ELECTRICAL ENGINEERING | 4,663,817 | 3,986,000 | 7,485,500 | 12,964,000 | 5,964,000 | 8,978,000 | 49.6% |
| 14 | METER READING | - | - | - | 50,800 | 50,800 | 50,800 | 0.0% |
| 15 | ERP SYSTEM | - | - | - | 1,803,500 | 1,803,500 | 1,803,500 | 0.0% |
| 16 | TOTAL EXPENSES | 14,502,040 | 7,546,000 | 14,702,500 | 17,938,300 | 10,738,300 | 10,392,300 | 42.3% |
17 BUDGET BALANCE 12,353,374 28,619,000 7,761,874 7,761,874 7,761,874 (20,857,126) -72.9%
18 TOTAL BUDGET BALANCE & EXPENSES 26,855,414 36,165,000 22,464,374 25,700,174 18,500,174 (10,464,826) -48.8%
| 2024/25 | $ DIFFERENCE | |||||||
|---|---|---|---|---|---|---|---|---|
| 2023/2024 | ORIGINAL | 2024/25 | 2025/2026 | 2025/2026 | FY25 VS | |||
| ACTUAL | APPROVED | PROJECTED | REQUESTED | RECOMMENDED | FY25 BUDGET | POLICY | ||
| 19 | RESERVE BALANCES | |||||||
| 20 | DEPRECIATION RESERVE | 21,778,487 | 13,517,800 | 19,616,687 | 20,416,687 | 20,416,687 | 6,898,887 | Min $10M |
| 21 | FUTURE CAPACITY RESERVE | 14,920,327 | 12,716,900 | 15,490,300 | 15,990,300 | 15,990,300 | 3,273,400 | Min $10M |
52
Página 69
For reference, no tax increase proposed in FY26 Draft Budget.
Projected Tax Revenue
| Taxable Value as of 7/1/2024 | $ 3,620,834,640.00 | |||
| Current Tax Rate | $ | 0.004550 | $ | 16,474,797.61 |
| Proposed Rate 1 ‐ 2 cent increase | $ | 0.004750 | $ | 17,198,964.54 |
| Proposed Rate 2 ‐ 3 cent increase | $ | 0.004850 | $ | 17,561,048.00 |
| Proposed Rate 3 ‐ 4 cent increase | $ | 0.004950 | $ | 17,923,131.47 |
| Proposed Rate 4 ‐ 6 cent increase | $ | 0.005150 | $ | 18,647,298.40 |
| Proposed Rate 5 ‐ 8 cent increase | $ | 0.005350 | $ | 19,371,465.32 |
| Proposed Rate 6 ‐ 10 cent increase | $ | 0.005550 | $ | 20,095,632.25 |
| Average residential home value | $ | 150,000.00 | ||
| Current Tax Rate | $ | 0.004350 | $ | 652.50 |
| Proposed Rate 1 ‐ 2 cent increase | $ | 0.004550 | $ | 682.50 |
| Proposed Rate 2 ‐ 3 cent increase | $ | 0.004850 | $ | 727.50 |
| Proposed Rate 3 ‐ 4 cent increase | $ | 0.004950 | $ | 742.50 |
| Proposed Rate 4 ‐ 6 cent increase | $ | 0.005150 | $ | 772.50 |
| Proposed Rate 5 ‐ 8 cent increase | $ | 0.005350 | $ | 802.50 |
| Proposed Rate 6 ‐ 10 cent increase | $ | 0.005550 | $ | 832.50 |
| Average residential home value | $ | 197,600.00 **based on census | |
|---|---|---|---|
| Current Tax Rate | $ | 0.004350 $ | 859.56 |
| Proposed Rate 1 ‐ 2 cent increase | $ | 0.004550 $ | 899.08 |
| Proposed Rate 2 ‐ 3 cent increase | $ | 0.004850 $ | 958.36 |
| Proposed Rate 3 ‐ 4 cent increase | $ | 0.004950 $ | 978.12 |
| Proposed Rate 4 ‐ 6 cent increase | $ | 0.005150 $ | 1,017.64 |
| Proposed Rate 5 ‐ 8 cent increase | $ | 0.005350 $ | 1,057.16 |
| Proposed Rate 6 ‐ 10 cent increase | $ | 0.005550 $ | 1,096.68 |
| Average residential home value | $ | 250,000.00 **stated value | |
|---|---|---|---|
| Current Tax Rate | $ | 0.004350 $ | 1,087.50 |
| Proposed Rate 1 ‐ 2 cent increase | $ | 0.004550 $ | 1,137.50 |
| Proposed Rate 2 ‐ 3 cent increase | $ | 0.004850 $ | 1,212.50 |
| Proposed Rate 3 ‐ 4 cent increase | $ | 0.004950 $ | 1,237.50 |
| Proposed Rate 4 ‐ 6 cent increase | $ | 0.005150 $ | 1,287.50 |
| Proposed Rate 5 ‐ 8 cent increase | $ | 0.005350 $ | 1,337.50 |
| Proposed Rate 6 ‐ 10 cent increase | $ | 0.005550 $ | 1,387.50 |
53
Página 70
THIS PAGE INTENTIONALLY LEFT BLANK
54
Página 71
PERSONNEL SUMMARY THE FOLLOWING SUBSECTIONS ARE INCLUDED:
PERSONNEL TABLE
PERSONNEL COST SUMMARY
OVERTIME TRENDS
STRATEGIC REQUESTS
Página 72
THIS PAGE INTENTIONALLY LEFT BLANK
Página 73
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
City of Dover
Fiscal Year 2026 Budget
Personnel Table
| 2023-2024 | 2024-2025 | 2025-2026 | ||
|---|---|---|---|---|
| DEPT/DIVISION | ||||
| BUDGET | BUDGET | RECOMMENDED | CHANGE | |
| CITY CLERK | 4.0 | 4.0 | 4.0 | 0.0 |
| CITY MANAGER | 5.0 | 5.0 | 4.0 | (1.0) |
| CODE ENFORCEMENT | 6.0 | 6.0 | 6.0 | 0.0 |
| CUSTOMER SERVICES | 15.0 | 15.0 | 15.0 | 0.0 |
| FACILITIES MAINTENANCE | 6.0 | 6.0 | 6.0 | 0.0 |
| FINANCE | 8.0 | 8.0 | 8.0 | 0.0 |
| FIRE DEPARTMENT | 6.0 | 6.0 | 6.0 | 0.0 |
| FLEET MAINTENANCE | 5.0 | 5.0 | 5.0 | 0.0 |
| GROUNDS | 14.0 | 14.0 | 14.0 | 0.0 |
| HUMAN RESOURCES | 4.0 | 4.0 | 4.0 | 0.0 |
| INFORMATION TECHNOLOGY | 5.0 | 5.0 | 5.0 | 0.0 |
| INSPECTIONS | 6.0 | 6.0 | 6.0 | 0.0 |
| LIBRARY | 14.0 | 14.0 | 14.0 | 0.0 |
| LIFE SAFETY | 4.0 | 4.0 | 5.0 | 1.0 |
| MAYOR | 2.0 | 2.0 | 2.0 | 0.0 |
| PARKS AND RECREATION | 10.0 | 10.0 | 10.0 | 0.0 |
| PLANNING | 6.0 | 6.0 | 6.0 | 0.0 |
| POLICE - TOTAL* | 145.0 | 145.0 | 147.0 | 2.0 |
| PROCUREMENT AND INVENTORY | 5.0 | 5.0 | 5.0 | 0.0 |
| PUBLIC WORKS - ADMINISTRATION | 5.0 | 5.0 | 4.0 | (1.0) |
| PUBLIC WORKS - ENGINEERING | 2.0 | 2.0 | 2.0 | 0.0 |
| STREETS | 7.0 | 7.0 | 7.0 | 0.0 |
| STORMWATER | 8.0 | 8.0 | 8.0 | 0.0 |
| SANITATION | 11.0 | 11.0 | 11.0 | 0.0 |
| GENERAL FUND AND CDBG TOTAL | 303.0 | 303.0 | 304.0 | 1.0 |
| ELECTRIC ADMINISTRATION | 3.0 | 3.0 | 3.0 | 0.0 |
| ELECTRIC SYSTEM OPERATIONS | 5.0 | 5.0 | 5.0 | 0.0 |
| ELECTRIC ENGINEERING | 11.0 | 11.0 | 11.0 | 0.0 |
| ELECTRIC T & D | 24.0 | 24.0 | 24.0 | 0.0 |
| METER READING - CUSTOMER SERVICE | 4.0 | 4.0 | 4.0 | 0.0 |
| ELECTRIC FUND TOTAL | 47.0 | 47.0 | 47.0 | 0.0 |
| WATER ENGINEERING | 2.5 | 2.5 | 2.5 | 0.0 |
| WASTEWATER ENGINEERING | 2.5 | 2.5 | 4.5 | 2.0 |
| WATER MAINTENANCE | 6.0 | 6.0 | 7.0 | 1.0 |
| WASTEWATER MAINTENANCE | 11.0 | 11.0 | 11.0 | 0.0 |
| WATER TREATMENT PLANT | 14.0 | 14.0 | 14.0 | 0.0 |
| WATER/WASTEWATER FUNDS TOTAL | 36.0 | 36.0 | 39.0 | 3.0 |
| TOTAL FULL-TIME PERSONNEL | 386.0 | 386.0 | 390.0 | 4.0 |
| *109 Officers; 38 Civilians - 147 Total Employees | ||||
| 2023-2024 | 2024-2025 | 2025-2026 | ||
| DEPT/DIVISION | ||||
| BUDGET | BUDGET | RECOMMENDED | CHANGE | |
| PART-TIME PERSONNEL | ||||
| CITY CLERK | 0.0 | 0.0 | 0.0 | 0.0 |
| CITY COUNCIL COMMITTEES | 17.0 | 19.0 | 19.0 | 0.0 |
| CITY MANAGER | 0.0 | 0.0 | 0.0 | 0.0 |
| PLANNING COMMISSION | 14.0 | 14.0 | 14.0 | 0.0 |
| FIRE (5 On Call Dispatchers) | 9.0 | 9.0 | 9.0 | 0.0 |
| GROUNDS | 0.0 | 0.0 | 0.0 | 0.0 |
| PARKS AND RECREATION | 15.0 | 15.0 | 15.0 | 0.0 |
| LIBRARY | 18.0 | 18.0 | 18.0 | 0.0 |
| POLICE CADET/PART TIME POSITIONS | 7.0 | 8.0 | 8.0 | 0.0 |
| PROCUREMENT AND INVENTORY | 1.0 | 1.0 | 1.0 | 0.0 |
| CUSTOMER SERVICES | 0.0 | 0.0 | 0.0 | 0.0 |
| METER READING - CUSTOMER SERVICE | 0.0 | 0.0 | 0.0 | 0.0 |
| FINANCE | 0.0 | 0.0 | 0.0 | 0.0 |
| INFORMATION TECHNOLOGY | 0.0 | 0.0 | 0.0 | 0.0 |
| HUMAN RESOURCES | 0.0 | 0.0 | 0.0 | 0.0 |
| ELECTRIC ENGINEERING | 0.0 | 0.0 | 0.0 | 0.0 |
| COMMUNITY DEVELOPMENT GRANT | 0.0 | 0.0 | 0.0 | 0.0 |
| SUBSTANCE ABUSE GRANT | 10.0 | 10.0 | 10.0 | 0.0 |
| TOTAL PART-TIME PERSONNEL | 91.0 | 94.0 | 94.0 | 0.0 |
| TOTAL PERSONNEL | 477.0 | 480.0 | 484.0 | 4.0 |
55
Página 74
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
City of Dover
2025-2026
BUDGET
Total City Personnel by Fund
| Dept/Div | # of | Division | Base Pay | Bonus/Allow./SD | Overtime | Part Time/Temp | Total | Total | Total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Number | Positions | Title | 51011 | On Call 51011 | 51012 | 51013 | Wages | Benefits | Personnel | ||||
| 1100-511 | 4 | City Clerk | $ | 293,500 | $ | 2,400 $ | - | $ | - | $ | 295,900 $ | 144,600 $ | 440,500 |
| 1200-512 | 21 | City Council | 192,900 | - | - | - | 192,900 | 15,400 | 208,300 | ||||
| 1600-533 | 20 | Planning | 556,500 | (18,400) | 13,000 | 9,000 | 560,100 | 416,900 | 977,000 | ||||
| 2100-515 | 4 | City Manager | 487,700 | 3,100 | - | - | 490,800 | 533,800 | 1,024,600 | ||||
| 3100-518 | 4 | Human Resources | 305,100 | 9,300 | - | - | 314,400 | 87,900 | 402,300 | ||||
| 3200-519 | 2 | Mayor | 110,800 | - | - | - | 110,800 | 63,100 | 173,900 | ||||
| 1400-514 | 15 | Fire | 385,800 | 5,800 | 55,200 | 31,000 | 477,800 | 141,000 | 618,800 | ||||
| 1600-531 | 5 | Life Safety | 482,500 | 300 | 29,900 | - | 512,700 | 491,500 | 1,004,200 | ||||
| 1600-532 | 6 | Code Enforcement | 386,600 | - | 14,300 | - | 400,900 | 199,200 | 600,100 | ||||
| 1600-534 | 6 | Building Inspections | 361,600 | - | 13,000 | - | 374,600 | 252,500 | 627,100 | ||||
| 1700-542 | 38 | Civilian Police | 2,536,500 | 40,600 | 187,900 | 182,200 | 2,947,200 | 1,838,400 | 4,785,600 | ||||
| 1700-543 | 109 | Law Enforcement | 11,071,500 | 179,200 | 962,700 | - | 12,213,400 | 6,094,600 | 18,308,000 | ||||
| 1700-544 | 0 | Police Extra Duty | 800,000 | - | - | - | 800,000 | 110,700 | 910,700 | ||||
| 2400-551 | 4 | Public Works Admin | 312,300 | 2,500 | 400 | - | 315,200 | 381,500 | 696,700 | ||||
| 1800-554 | 7 | Streets | 387,300 | 1,700 | 13,200 | - | 402,200 | 271,800 | 674,000 | ||||
| 1800-555 | 11 | Sanitation | 637,300 | 1,600 | 17,000 | - | 655,900 | 635,300 | 1,291,200 | ||||
| 1800-560 | 8 | Stormwater | 422,000 | 2,200 | 10,200 | - | 434,400 | 211,800 | 646,200 | ||||
| 2500-552 | 6 | Facilities | 344,400 | - | 7,500 | - | 351,900 | 230,800 | 582,700 | ||||
| 2600-553 | 2 | Public Works Engineering | 147,500 | 2,200 | 2,500 | - | 152,200 | 72,900 | 225,100 | ||||
| 1500-523 | 32 | Library | 869,400 | 9,000 | - | 368,100 | 1,246,500 | 722,900 | 1,969,400 | ||||
| 1500-522 | 14 | Grounds | 827,100 | - | 28,400 | - | 855,500 | 821,100 | 1,676,600 | ||||
| 1500-525 | 25 | Recreation | 623,700 | 4,800 | 10,000 | 180,900 | 819,400 | 481,300 | 1,300,700 | ||||
| 2700-571 | 6 | Procurement & Inventory | 363,500 | - | 1,400 | 25,900 | 390,800 | 210,600 | 601,400 | ||||
| 2800-572 | 5 | Fleet Maintenance | 334,700 | - | 5,300 | - | 340,000 | 254,400 | 594,400 | ||||
| 2200-516 | 5 | Information Technology | 427,800 | - | 1,600 | - | 429,400 | 287,500 | 716,900 | ||||
| 2300-517 | 8 | Finance | 600,900 | 7,700 | - | - | 608,600 | 246,600 | 855,200 | ||||
| 2900-529 | 15 | Customer Service | 854,400 | - | 3,300 | - | 857,700 | 511,900 | 1,369,600 | ||||
| Total General Fund | $ | 25,123,300 | $ | 254,000 $ 1,376,800 $ | 797,100 $ | 27,551,200 $ | 15,730,000 $ | 43,281,200 |
| Dept/Div | # of | Division | Base Pay | Bonus/Allow./SD | Overtime | Part Time/Temp | Total | Total | Total | |||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Number | Positions | Title | 10-11 | On Call 10-11 | 10-12 | 10-13 | Wages | Benefits | Personnel | |||
| 2600-553 | 2.5 | Water Engineering | $ | 235,600 $ | 3,700 $ | - | $ | - | $ | 239,300 $ | 111,100 $ | 350,400 |
| 6800-568 | 7 | Water Maintenance | 484,500 | 13,300 | 16,700 | - | 514,500 | 303,600 | 818,100 | |||
| 7600-576 | 14 | Water Treatment | 1,091,900 | 23,000 | 35,700 | - | 1,150,600 | 649,700 | 1,800,300 | |||
| 2600-553 | 2.5 | Wastewater Engineering | 313,900 | - | 2,900 | - | 316,800 | 135,700 | 452,500 | |||
| 6900-569 | 11 | Wastewater Maintenance | 632,400 | 18,800 | 53,200 | - | 704,400 | 340,000 | 1,044,400 | |||
| Total Water/Wastewater Fund | $ | 2,758,300 $ | 58,800 $ | 108,500 $ | - | $ | 2,925,600 $ | 1,540,100 $ | 4,465,700 |
| Dept/Div | # of | Division | Base Pay | Bonus/Allow./SD | Overtime | Part Time/Temp | Total | Total | Total | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Number | Positions | Title | 10-11 | On Call 10-11 | 10-12 | 10-13 | Wages | Benefits | Personnel | ||
| 8300-563 | 11 | Engineering | 1,132,600 | 19,800 | 17,200 | - | 1,169,600 | 513,000 | 1,682,600 | ||
| 8200-562 | 24 | T&D | $ | 2,633,100 $ | 45,100 $ | 188,100 $ | - | $ | 2,866,300 $ | 1,514,300 $ | 4,380,600 |
| 8400-564 | 3 | Administration | 293,800 | - | - | - | 293,800 | 139,300 | 433,100 | ||
| 8500-565 | 4 | Meter Reading | 260,300 | 24,000 | 26,400 | - | 310,700 | 212,400 | 523,100 | ||
| 8600-526 | 5 | System Operators | 617,100 | 13,000 | 149,600 | - | 779,700 | 379,700 | 1,159,400 | ||
| Total Electric Fund | $ | 4,936,900 $ | 101,900 $ | 381,300 $ | - | $ | 5,420,100 $ | 2,758,700 $ | 8,178,800 |
| Dept/Div | # of | Division | Base Pay | Bonus/Allow./SD | Overtime | Part Time/Temp | Total | Total | Total | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Number | Positions | Title | 10-11 | On Call 10-11 | 10-12 | 10-13 | Wages | Benefits | Personnel | |||||
| 9900-596 | 0 | CDBG | $ | - | $ | 35,000 $ | - | $ | - | $ | 35,000 $ | - | $ | 35,000 |
| 9900-542 | 6 | Police Cadet Program | - | - | - | - | - | - | - | |||||
| 1500-581 | 10 | Substance Abuse Grant | - | - | - | 53,900 | 53,900 | 4,300 | 58,200 | |||||
| Total Grant Funds | $ | - | $ | 35,000 $ | - | $ | 53,900 $ | 88,900 $ | 4,300 $ | 93,200 |
482 GRAND TOTAL $ 32,818,500 $ 449,700 $ 1,866,600 $ 851,000 $ 35,985,800 $ 20,033,100 $ 56,018,900
56
Página 75
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
CITY OF DOVER OVERTIME COMPARISON FISCAL YEAR 2023 THROUGH 2026
| # | 2023 | 2024 | 2025 (through April) | 2026 | ||||||||||
| DEPARTMENT | Orig. Budget | Actual | Variance | % To Date | Orig. Budget | Actual | Variance | % To Date | Orig. Budget | Actual | Variance | % To Date | Proposed | |
| CITY CLERK | - | 881 | (881) | --- | - | 6,639 | (6,639) | 100.0% | - | 929.37 | (929) | 100.0% | - | |
| PLANNING | 7,000 | 7,398 | (398) | 105.7% | 6,300 | 9,296 | (2,996) | 147.6% | 11,700.00 | 8,163.51 | 3,536 | 69.8% | 13,000 | |
| CITY MANAGER | 5,400 | 5,293 | 107 | 98.0% | 4,800 | 23,056 | (18,256) | 480.3% | 3,400.00 | 15,057.73 | (11,658) | 442.9% | - | |
| HUMAN RESOURCES | - | 227 | (227) | --- | - | - | 0 | 0.0% | - | 0.0% | - | |||
| MAYOR | - | - | 0 | --- | - | - | 0 | 0.0% | - | 0.0% | - | |||
| FIRE | 25,000 | 76,887 | (51,887) | 307.5% | 37,200 | 64,643 | (27,443) | 173.8% | 61,200.00 | 61,658.87 | (459) | 100.7% | 55,200 | |
| LIFE SAFETY | 9,000 | 10,833 | (1,833) | 120.4% | 11,900 | 5,188 | 6,712 | 43.6% | 39,400.00 | 13,525.13 | 25,875 | 34.3% | 29,900 | |
| CODE ENFORCEMENT | 5,000 | 3,737 | 1,263 | 74.7% | 5,600 | 2,562 | 3,038 | 45.8% | 4,600.00 | 365.38 | 4,235 | 7.9% | 14,300 | |
| PUBLIC INSPECTIONS | 8,000 | 4,930 | 3,070 | 61.6% | 11,100 | 6,316 | 4,784 | 56.9% | 7,300.00 | 9,309.97 | (2,010) | 127.5% | 13,000 | |
| POLICE CIVILIAN | 163,600 | 169,637 | (6,037) | 103.7% | 189,200 | 225,609 | (36,409) | 119.2% | 167,900.00 | 189,718.16 | (21,818) | 113.0% | 187,900 | |
| POLICE LAW ENFORCEMENT | 650,000 | 728,180 | (78,180) | 112.0% | 738,100 | 941,196 | (203,096) | 127.5% | 761,100.00 | 822,786.95 | (61,687) | 108.1% | 962,700 | |
| PW ADMINISTRATION | - | - | 0 | --- | 400 | - | 400 | 0.0% | 800.00 | - | 800 | 0.0% | 400 | |
| STREET | 11,400 | 4,755 | 6,646 | 41.7% | 15,600 | 7,805 | 7,795 | 50.0% | 16,000.00 | 10,326.47 | 5,674 | 64.5% | 13,200 | |
| SANITATION | 17,300 | 7,264 | 10,036 | 42.0% | 20,700 | 11,270 | 9,430 | 54.4% | 21,000.00 | 13,105.36 | 7,895 | 62.4% | 17,000 | |
| GROUNDS | 10,700 | 13,730 | (3,030) | 128.3% | 18,100 | 22,661 | (4,561) | 125.2% | 27,200.00 | 24,689.96 | 2,510 | 90.8% | 28,400 | |
| STORMWATER | 8,800 | 1,243 | 7,557 | 14.1% | 11,100 | 4,847 | 6,253 | 43.7% | 11,400.00 | 6,811.55 | 4,588 | 59.8% | 10,200 | |
| FACILITIES MANAGEMENT | 5,000 | 3,384 | 1,616 | 67.7% | 5,000 | 1,309 | 3,691 | 26.2% | 8,100.00 | 3,242.90 | 4,857 | 40.0% | 7,500 | |
| PW ENGINEERING | 1,300 | 1,855 | (555) | 142.7% | 1,600 | 2,201 | (601) | 137.6% | 1,800.00 | 1,985.46 | (185) | 110.3% | 2,500 | |
| LIBRARY | - | 117 | (117) | --- | - | - | 0 | 0.0% | - | - | 0.0% | - | ||
| PARKS & RECREATION | 2,700 | 6,099 | (3,399) | 225.9% | 3,900 | 8,524 | (4,624) | 218.6% | 6,400.00 | 14,809.07 | (8,409) | 231.4% | 10,000 | |
| PROCUREMENT & INVENTORY | 1,400 | 373 | 1,027 | 26.7% | 1,700 | 1,113 | 587 | 65.5% | 1,400.00 | 969.39 | 431 | 69.2% | 1,400 | |
| VEHICLE MAINTENANCE | 5,000 | 2,071 | 2,929 | 41.4% | 5,900 | 4,429 | 1,471 | 75.1% | 5,100.00 | 7,299.86 | (2,200) | 143.1% | 5,300 | |
| 57 | INFORMATION TECHNOLOGIES | 1,800 | 878 | 922 | --- | 2,000 | 1,634 | 366 | 81.7% | 1,200.00 | 1,590.02 | (390) | 132.5% | 1,600 |
| FINANCE | - | - | 0 | --- | - | - | 0 | 0.0% | - | - | - | 0.0% | - | |
| CUSTOMER SERVICES | 400 | 9,947 | (9,547) | --- | 11,900 | (332) | 12,232 | -2.8% | - | - | - | 0.0% | 3,300 | |
| WATER ENGINEERING | - | 10 | (10) | --- | - | - | 0 | 0.0% | - | - | - | 0.0% | - | |
| WATER | 20,800 | 14,659 | 6,141 | 70.5% | 29,500 | 15,139.63 | 14,360 | 51.3% | 19,000.00 | 18,636.38 | 364 | 98.1% | 16,700 | |
| WATER TREATMENT PLANT | 44,900 | 19,835 | 25,065 | 44.2% | 53,600 | 23,616.61 | 29,983 | 44.1% | 52,400.00 | 28,706.71 | 23,693 | 54.8% | 35,700 | |
| WASTEWATER | 30,300 | 26,689 | 3,611 | 88.1% | 36,700 | 47,759 | (11,059) | 130.1% | 38,000.00 | 62,476.65 | (24,477) | 164.4% | 53,200 | |
| WASTEWATER ENGINEERING | 1,000 | 10 | 990 | --- | 1,700 | 1,619 | 81 | 95.3% | 1,900.00 | 1,749.83 | 150 | 92.1% | 2,900 | |
| TRANSMISSION/DISTRIBUTION | 139,800 | 152,026 | (12,226) | 108.7% | 161,300 | 180,543 | (19,243) | 111.9% | 172,900.00 | 143,782.32 | 29,118 | 83.2% | 188,100 | |
| ELECTRIC ENGINEERING | 12,100 | 11,547 | 553 | 95.4% | 21,300 | 20,057 | 1,243 | 94.2% | 16,800.00 | 12,168.28 | 4,632 | 72.4% | 17,200 | |
| ELECTRIC ADMINISTRATION | - | 279 | (279) | --- | - | 272 | (272) | 100.0% | 20.95 | (21) | 100.0% | - | ||
| ELECTRIC METERING | 10,200 | 5,291 | 4,909 | 51.9% | 8,700 | 16,400 | (7,700) | 188.5% | 16,400.00 | 8,174.96 | 8,225 | 49.8% | 26,400 | |
| ELECTRIC SYSTEMS OPERATIONS | 111,000 | 88,635 | 22,365 | 79.9% | 136,000 | 114,431 | 21,569 | 84.1% | 151,100.00 | 89,530.69 | 61,569 | 59.3% | 149,600 | |
| TOTAL | 1,308,900 | 1,378,697 | (69,797) | 105.3% | 1,550,900 | 1,769,804 | (218,904) | 114.1% | 1,625,500.00 | 1,571,591.88 | 53,908 | 96.7% | 1,866,600 |
ELECTRIC PLANT OPERATIONS 18,000 38,880 (20,880) 216.0% 18,000 1,624 16,376 9.0% 12,000.00 1,908.33 10,092 15.9% 18,000
POLICE EXTRA DUTY 355,800 543,669 (187,869) 152.8% 355,800 655,819 (300,019) 184.3% 355,800.00 822,324.30 (466,524) 231.1% 800,000
Página 76
FY26 STRATEGIC REQUESTS
Approved General Fund:
- •Provide six (6) month overlap for replacement of Community Development Manager.
- •Move one (1) Public Works Administrative Assistant from the General Fund to the Wastewater Fund.
- •Promote two (2) Customer Service Clerk I’s to Customer Service Clerk II’s.
- •Regrade Code Enforcement Inspectors.
- •Regrade Building Inspectors.
- •Provide an additional Communications Operator for the Police Department. (NEW)
- •Provide an additional Clerk II/III for the Police Department. (NEW)
- •Reclassify Public Affairs & Emergency Management Coordinator to Emergency Services Director.
- •Reclassify Life Safety Inspector III to Emergency Services Deputy Director.
- •Increase salary of the Fire Administrative Manager.
Denied General Fund:
- •Provide an additional part-time Customer Service Clerk I. (NEW)
- •Provide five (5) additional Fire Fighter II’s. (NEW)
Approved Water/Wastewater Fund:
- •Reclassify Water Production Manager to Assistant Director of Water & Wastewater.
- •Reclassify five (5) Water Treatment Plant Operators II’s to Water Treatment Plant Operator III’s.
- •Promote four (4) Water Treatment Plant Operator I’s to Water Treatment Plant Operator II’s.
- •Provide an additional Water Service Person in the Water Fund. (NEW)
- •Provide a GIS Specialist in the Wastewater Fund. (NEW)
Approved Electric Fund:
- •Promote one (1) Field Service Representative I to Field Service Representative II.
- •Promote one (1) Lineman Second Class to Lineman First Class.
- •Provide six (6) month overlap for replacement of Administrative Assistant.
58
Página 77
CAPITAL INVESTMENTS PLAN THE FOLLOWING SUBSECTIONS ARE INCLUDED:
REVENUE SOURCES AND FUNDS:
TOTAL CITY SUMMARY
GENERAL
SANITATION
PUBLIC UTILITIES WATER
PUBLIC UTILITIES WASTEWATER
PUBLIC UTILITIES ELECTRIC
Página 78
THIS PAGE INTENTIONALLY LEFT BLANK
Página 79
CAPITAL INVESTMENT PLANS
Revenue Sources & Funds
Total City Summary
General Fund
Sanitation Fund
Water Fund
Wastewater Fund
Electric Fund
59
Página 80
THIS PAGE INTENTIONALLY LEFT BLANK
60
Página 81
CITY SUMMARY
61
Página 82
THIS PAGE INTENTIONALLY LEFT BLANK
62
Página 83
63
Página 84
64
Página 85
65
Página 86
66
Página 87
67
Página 88
68
Página 89
69
Página 90
70
Página 91
GENERAL FUND
71
Página 92
THIS PAGE INTENTIONALLY LEFT BLANK
72
Página 93
73
Página 94
74
Página 95
75
Página 96
76
Página 97
77
Página 98
78
Página 99
79
Página 100
80
Página 101
81
Página 102
82
Página 103
83
Página 104
84
Página 105
85
Página 106
86
Página 107
87
Página 108
88
Página 109
89
Página 110
90
Página 111
91
Página 112
92
Página 113
93
Página 114
94
Página 115
95
Página 116
96
Página 117
97
Página 118
98
Página 119
99
Página 120
100
Página 121
101
Página 122
102
Página 123
103
Página 124
104
Página 125
105
Página 126
106
Página 127
107
Página 128
108
Página 129
109
Página 130
110
Página 131
111
Página 132
112
Página 133
113
Página 134
114
Página 135
115
Página 136
116
Página 137
117
Página 138
118
Página 139
119
Página 140
120
Página 141
121
Página 142
122
Página 143
123
Página 144
124
Página 145
125
Página 146
126
Página 147
127
Página 148
128
Página 149
SANITATION FUND
129
Página 150
THIS PAGE INTENTIONALLY LEFT BLANK
130
Página 151
131
Página 152
132
Página 153
133
Página 154
134
Página 155
WATER FUND
135
Página 156
THIS PAGE INTENTIONALLY LEFT BLANK
136
Página 157
137
Página 158
138
Página 159
139
Página 160
140
Página 161
141
Página 162
142
Página 163
143
Página 164
144
Página 165
145
Página 166
146
Página 167
147
Página 168
148
Página 169
149
Página 170
THIS PAGE INTENTIONALLY LEFT BLANK
150
Página 171
WASTEWATER FUND
151
Página 172
THIS PAGE INTENTIONALLY LEFT BLANK
152
Página 173
153
Página 174
154
Página 175
155
Página 176
156
Página 177
157
Página 178
158
Página 179
159
Página 180
160
Página 181
161
Página 182
162
Página 183
163
Página 184
164
Página 185
165
Página 186
THIS PAGE INTENTIONALLY LEFT BLANK
166
Página 187
ELECTRIC FUND
167
Página 188
THIS PAGE INTENTIONALLY LEFT BLANK
168
Página 189
169
Página 190
170
Página 191
171
Página 192
172
Página 193
173
Página 194
174
Página 195
175
Página 196
176
Página 197
177
Página 198
178
Página 199
179
Página 200
180
Página 201
181
Página 202
182
Página 203
183
Página 204
184
Página 205
185
Página 206
186
Página 207
187
Página 208
188
Página 209
189
Página 210
190
Página 211
191
Página 212
192
Página 213
193
Página 214
194
Página 215
195
Página 216
196
Página 217
197
Página 218
THIS PAGE INTENTIONALLY LEFT BLANK
198
Página 219
DEBT SERVICE THE FOLLOWING SUBSECTIONS ARE INCLUDED:
DEBT LIMIT DEBT SERVICE SCHEDULES
Página 220
THIS PAGE INTENTIONALLY LEFT BLANK
Página 221
Table 14
Computation of Legal Debt Margin
Last Ten Fiscal Years
(amounts expressed in thousands)
Fiscal Year
| 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 | ||||
| Debt Limit | $ 182,504 | $ 181,594 | $ 179,226 | $ 179,004 | $ 163,700 $ 162,904 | $ | 160,737 | $ | 157,816 | $ | 155,396 | $ | 158,485 |
| Net (Taxable) Assessed Value on Books | 3,650,076 | 3,631,886 | 3,584,529 | 3,580,083 | 3,273,993 | 3,258,090 | 3,214,744 | 3,156,311 | 3,107,912 | 3,207,154 |
| Total net debt applicable to limit | 5,108 | 5,614 | 6,111 | 6,599 | 5,371 | 5,700 | 5,877 | 6,209 | 6,783 | 7,337 | ||||||||
| Legal Debt Margin | $ 177,396 | $ 175,980 | $ | 173,115 | $ | 172,405 | $ | 158,329 | $ | 157,204 | $ | 154,860 | $ | 151,607 | $ | 148,613 | $ | 151,148 |
Total Net Debt applicable to limit as a percentage of debt limit 2.80% 3.09% 3.41% 3.69% 3.28% 3.50% 3.59% 4.36% 4.63% 2.56%
Legal Debt Margin Calculation for the current fiscal year
Net (Taxable) Assessed Value on Books $ 3,650,076
Debt Limit - 5 Percent of Total Assessed Value $ 182,504
DEBT
(For which the City's full faith and credit has been pledged)
199
Gross Bonded Debt 5,108
LEGAL DEBT MARGIN $ 177,396
Source: City of Dover Financial Reports, City of Dover Charter, Section 50(b), and Tax Assessor's Office July 2009 the Charter was amended and the debt limit was reduced from 25% of the total assessed value to 5%.
Página 222
CITY OF DOVER DEBT SERVICE
SCHEDULES
2019 General Obligation Bonds 2021 General Obligation Bonds Total General Fiscal Fund Debt Year Principal Interest Principal Interest Service
2024
| 356,556 | 101,565 | 149,662 | 22,830 | 630,613 | ||||||
| 2025 | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| 364,092 | 92,569 | 152,211 | 17,774 | 626,646 | ||||||
| 2026 | ||||||||||
| 371,544 | 83,664 | 154,804 | 15,182 | 625,194 | ||||||
| 200 | 2027 | |||||||||
| 379,140 | 74,576 | 157,440 | 12,545 | 623,701 | ||||||
| 2028 | ||||||||||
| 386,760 | 65,478 | 160,122 | 9,864 | 622,224 | ||||||
| 2029 | ||||||||||
| 2,485,176 | 55,843 | 162,849 | 7,136 | 2,711,004 | ||||||
| 2030 | ||||||||||
| 165,622 | 4,363 | 169,985 | ||||||||
| 2031 | ||||||||||
| 168,443 | 1,542 | 169,985 | ||||||||
| Total | $ | 4,343,268 | $ | 473,695 | $ | 1,271,153 | $ | 91,236 | $ | 6,179,352 |
Página 223
CITY OF DOVER DEBT SERVICE SCHEDULES (CONTINUED)
Water/Wastewater Fund Water/Wastewater Fund 2009 Municipal Revenue 2010 Municipal Revenue Bonds 2011 Municipal Revenue Fiscal Bonds (Wastewater) (Water) Bonds (Wastewater) Year Principal Interest Principal Interest Principal Interest
2024 294,505 52,543 133,649 27,640 43,302 14,823
| 2025 | 300,424 | 46,624 | 137,160 | 24,129 | 44,875 | 13,250 |
| 201 | ||||||
|---|---|---|---|---|---|---|
| 2026 | 306,463 | 40,585 | 140,764 | 20,526 | 46,505 | 11,619 |
2027 312,623 34,425 144,461 16,828 48,195 9,930
2028 318,906 28,142 148,257 13,033 49,946 8,178
2029 325,316 21,732 152,151 9,138 51,761 6,364
2030 331,855 15,193 156,148 5,141 53,642 4,483
2031 338,526 8,522 79,607 1,039 55,592 2,534
| 2032 | 171,807 | 1,718 | - | - | 28,548 | 514 | ||||
| Total | $ 2,700,425 | $ | 249,484 | $ 1,092,197 | $ | 117,474 | $ | 422,366 | $ | 71,695 |
Página 224
202
Página 225
CITY OF DOVER DEBT SERVICE
SCHEDULES (CONTINUED)
Electric Revenue Fund
Fiscal 2018 Revenue Bonds Electric
Year Principal Interest Total
2024 910,000 466,950 1,376,950
2025 955,000 420,325 1,375,325
2026 1,005,000 371,325 1,376,325
203 2027 1,055,000 319,825 1,374,825
2028 1,110,000 265,700 1,375,700
2029 1,160,000 214,750 1,374,750
2030 1,200,000 173,550 1,373,550
2031 1,240,000 136,950 1,376,950
2032 1,275,000 99,225 1,374,225
2033 1,315,000 60,375 1,375,375
| 2034 | 1,355,000 | 20,325 | 1,375,325 |
| $12,580,000 | $ 2,549,300 | $ | 15,129,300 |
Página 226
THIS PAGE INTENTIONALLY LEFT BLANK
204
Página 227
GENERAL THE FOLLOWING SUBSECTIONS ARE INCLUDED:
MAYOR CITY COUNCIL CITY MANAGER CITY CLERK CENTRAL SERVICES CUSTOMER SERVICES EMERGENCY MANAGEMENT AND COMMUNICATIONS FINANCE FIRE HUMAN RESOURCES INFORMATION TECHNOLOGY LIBRARY PARKS, RECREATION, AND GROUNDS PLANNING, INSPECTIONS, AND COMMUNITY DEVELOPMENT POLICE PUBLIC WORKS
Página 228
THIS PAGE INTENTIONALLY LEFT BLANK
Página 229
GENERAL FUND BUDGET REVIEW
Fiscal Year 2025-2026
205
Página 230
THIS PAGE INTENTIONALLY LEFT BLANK
206
Página 231
01213456ÿ89ÿ84
"#4$%214ÿ66162&52
ÿ !
207
Página 232
Mayor
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 % DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 102,729 161,500 161,500 173,900 173,900 8%
MATERIALS & SUPPLIES 700 2,600 2,600 1,100 1,100 -58%
ADMINISTRATIVE EXPENDITURES 98,034 140,500 140,500 141,700 141,700 1%
TOTAL EXPENDITURES $ 201,462 $ 304,600 $ 304,600 $ 316,700 $ 316,700 4%
Highlights:
No significant changes to departmental budget.
208
Página 233
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
MAYOR 100-10-32-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 70,602 | $ | 103,700 | $ | 103,700 | $ | 110,800 | $ | 110,800 | 7% |
| FICA TAXES | 4,980 | 8,000 | 8,000 | 8,500 | 8,500 | 6% | |||||
| HEALTH INSURANCE | 25,130 | 46,600 | 46,600 | 48,600 | 48,600 | 4% | |||||
| L I D INSURANCE | 559 | 800 | 800 | 1,300 | 1,300 | 63% | |||||
| WORKERS COMPENSATION | 229 | 300 | 300 | 400 | 400 | 33% | |||||
| PENSION | 523 | 1,600 | 1,600 | 3,800 | 3,800 | 138% | |||||
| OPEB | 706 | 500 | 500 | 500 | 500 | 0% | |||||
| PERSONNEL COSTS | 102,729 | 161,500 | 161,500 | 173,900 | 173,900 | 8% |
| OFFICE SUPPLIES | 587 | 600 | 600 | 600 | 600 | 0% |
| PRINTING AND DUPLICATING | 113 | 500 | 500 | 500 | 500 | 0% |
| COMPUTER HARDWARE | - | 1,500 | 1,500 | - | - | -100% |
| MATERIALS & SUPPLIES | 700 | 2,600 | 2,600 | 1,100 | 1,100 | -58% |
| TELEPHONE/FAX | 745 | 500 | 500 | 700 | 700 | 40% |
| ADVERTISEMENT | 1,058 | 1,500 | 1,500 | 1,500 | 1,500 | 0% |
| SUBSCRIPTIONS AND DUES | 649 | 1,500 | 1,500 | 1,500 | 1,500 | 0% |
| COMMUNITY RELATIONS EXP | 5,466 | 7,000 | 7,000 | 8,000 | 8,000 | 14% |
| COMMUNITY ENHANCEMENT | 3,984 | 5,000 | 5,000 | 5,000 | 5,000 | 0% |
| ECONOMIC DEVELOPMENT | 86,132 | 125,000 | 125,000 | 125,000 | 125,000 | 0% |
| ADMINISTRATIVE EXPENDITURES | 98,034 | 140,500 | 140,500 | 141,700 | 141,700 | 1% |
TOTAL EXPENDITURES $ 201,462 $ 304,600 $ 304,600 $ 316,700 $ 316,700 4%
PERSONNEL BUDGETED FULL-TIME POSITIONS 2.0 2.0 2.0 2.0 2.0
209
Página 234
THIS PAGE INTENTIONALLY LEFT BLANK
210
Página 235
0ÿ00
01213456ÿ89ÿ84
012ÿ0851
162ÿ16212 485ÿ16212 1ÿ16212 82ÿ16212 24
1ÿ!"ÿ#16$ 854ÿ( 4ÿ"ÿ41 1ÿ"ÿ54685
54ÿ!"ÿ)842
%4ÿ"ÿ&8'ÿ" )15ÿ*"ÿ4+16 11ÿ,"ÿ52 &8ÿ4'ÿ"
211
Página 236
City Council
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 % DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 186,210 200,800 200,800 208,300 208,300 4%
MATERIALS & SUPPLIES 93 2,200 1,900 2,200 2,200 0%
ADMINISTRATIVE EXPENDITURES 48,008 63,500 63,800 66,100 66,100 4%
TOTAL EXPENDITURES $ 234,310 $ 266,500 $ 266,500 $ 276,600 $ 276,600 4%
Highlights:
New Councilwoman Donyale Hall elected to Second District.
212
Página 237
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
CITY COUNCIL 100-10-12-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| TEMPORARY HELP | $ | 172,404 | $ | 186,000 | $ | 186,000 | $ | 192,900 | $ | 192,900 | 4% |
| FICA TAXES | 13,244 | 14,200 | 14,200 | 14,800 | 14,800 | 4% | |||||
| WORKERS COMPENSATION | 561 | 600 | 600 | 600 | 600 | 0% | |||||
| PERSONNEL COSTS | 186,210 | 200,800 | 200,800 | 208,300 | 208,300 | 4% |
| OFFICE SUPPLIES | - | 100 | 100 | 100 | 100 | 0% |
| PRINTING AND DUPLICATING | 47 | 300 | 300 | 300 | 300 | 0% |
| COMPUTER HARDWARE | 46 | 1,800 | 1,500 | 1,800 | 1,800 | 0% |
| MATERIALS & SUPPLIES | 93 | 2,200 | 1,900 | 2,200 | 2,200 | 0% |
| TELEPHONE/FAX | 2,428 | 2,200 | 2,200 | 2,300 | 2,300 | 5% |
| SUBSCRIPTIONS AND DUES | 11,212 | 11,500 | 11,800 | 12,000 | 12,000 | 4% |
| TRAINING/CONF/FOOD/TRAVEL | 6,530 | 9,000 | 9,000 | 10,000 | 10,000 | 11% |
| CONTRACTUAL SERVICES | 5,400 | 7,900 | 7,900 | 8,900 | 8,900 | 13% |
| COMMUNITY RELATIONS EXP | 2,772 | 4,900 | 4,900 | 4,900 | 4,900 | 0% |
| DISCRETIONARY FUNDS | 19,500 | 25,000 | 25,000 | 25,000 | 25,000 | 0% |
| HRC-OFFICE SUPPLIES | 166 | 3,000 | 3,000 | 3,000 | 3,000 | 0% |
| ADMINISTRATIVE EXPENDITURES | 48,008 | 63,500 | 63,800 | 66,100 | 66,100 | 4% |
TOTAL EXPENDITURES $ 234,310 $ 266,500 $ 266,500 $ 276,600 $ 276,600 4%
PERSONNEL BUDGETED FULL-TIME POSITIONS
| PP/COUNCIL | 9.0 | 9.0 | 9.0 | 9.0 | 9.0 |
| PP/TEMP COMMITTEES | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 |
213
Página 238
THIS PAGE INTENTIONALLY LEFT BLANK
214
Página 239
0123ÿ 7 0123ÿ0567819 0123ÿ 7 8621ÿ1272 1272ÿ0123ÿ 7 6 2ÿ7932 6918ÿ5 0729ÿ18 98218 2ÿÿ 2 2 0625 ÿ18 2ÿ717 17 17122157 586 72 17122157 6 7ÿ 568 2ÿ 2) 7122157 *819121ÿ 717 17 !7"5 2157ÿ#8$75951 7 72 2ÿ# 2 72ÿ972 %13 2 2 *9 2ÿ 172778 #71157ÿÿ 2 2ÿ7) +12162157 8 2157ÿÿ&567 25 2 2 2ÿ 2) 32ÿ,(2157 97717'!7(82157'05ÿ7") 717 17 215 783ÿ 2ÿÿ0567182157
Página 240
City Manager
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 % DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 1,064,602 1,074,800 1,074,800 1,024,600 1,024,600 -5%
MATERIALS & SUPPLIES 9,836 19,000 19,000 11,700 11,700 -38%
ADMINISTRATIVE EXPENDITURES 402,679 185,200 285,200 434,300 434,000 134%
TOTAL EXPENDITURES $ 1,517,117 $ 1,279,000 $ 1,379,000 $ 1,470,600 $ 1,470,300 15%
Highlights: Public Affairs & Emergency Management Coordinator moved to head new Emergency Management & Communications Department (formerly Life Safety).
Legal Expenses increased based on new Solicitor and recent legal activity.
216
Página 241
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
CITY MANAGER 100-10-21-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 557,927 | $ | 579,900 | $ | 579,900 | $ | 490,800 | $ | 490,800 | -15% |
| OVERTIME | 23,056 | 3,400 | 3,400 | - | - | -100% | |||||
| FICA TAXES | 42,890 | 44,600 | 44,600 | 37,500 | 37,500 | -16% | |||||
| HEALTH INSURANCE | 83,757 | 106,400 | 106,400 | 76,100 | 76,100 | -28% | |||||
| L I D INSURANCE | 3,225 | 3,400 | 3,400 | 5,000 | 5,000 | 47% | |||||
| WORKERS COMPENSATION | 1,882 | 1,900 | 1,900 | 1,600 | 1,600 | -16% | |||||
| PENSION | 346,055 | 329,400 | 329,400 | 408,700 | 408,700 | 24% | |||||
| OPEB | 5,810 | 5,800 | 5,800 | 4,900 | 4,900 | -16% | |||||
| PERSONNEL COSTS | 1,064,602 | 1,074,800 | 1,074,800 | 1,024,600 | 1,024,600 | -5% |
| OFFICE SUPPLIES | 761 | 800 | 800 | 800 | 800 | 0% |
| PRINTING AND DUPLICATING | 3,896 | 5,900 | 5,900 | 5,900 | 5,900 | 0% |
| PROGRAM EXPENSES/SUPPLIES | 4,999 | 10,500 | 10,500 | 5,000 | 5,000 | -52% |
| COMPUTER HARDWARE | 179 | 1,800 | 1,800 | - | - | -100% |
| MATERIALS & SUPPLIES | 9,836 | 19,000 | 19,000 | 11,700 | 11,700 | -38% |
| TELEPHONE/FAX | 3,727 | 2,400 | 2,400 | 3,500 | 3,500 | 46% | |||||
| SUBSCRIPTIONS AND DUES | 3,705 | 5,600 | 5,600 | 5,600 | 5,600 | 0% | |||||
| TRAINING/CONF/FOOD/TRAVEL | 1,619 | 6,000 | 6,000 | 6,000 | 6,000 | 0% | |||||
| LEGAL EXPENSES | 368,260 | 152,000 | 252,000 | 400,000 | 400,000 | 163% | |||||
| COMMUNITY RELATIONS EXP | - | 200 | 200 | 200 | 200 | 0% | |||||
| GASOLINE | 117 | 500 | 500 | 500 | 200 | -60% | |||||
| ECONOMIC DEVELOPMENT | 18,500 | 18,500 | 18,500 | 18,500 | 18,500 | 0% | |||||
| 0% | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| TOTAL EXPENDITURES | $ | 1,517,117 | $ | 1,279,000 | $ | 1,379,000 | $ | 1,470,600 | $ | 1,470,300 | 15% |
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 5.0 | 5.0 | 5.0 | 5.0 | 4.0 |
| BUDGETED PART-TIME POSITIONS | - | - | - | - |
217
Página 242
THIS PAGE INTENTIONALLY LEFT BLANK
218
Página 243
0ÿ0
0123ÿ0567819
0123ÿ09 ÿ1825ÿ5ÿ0567819ÿ1ÿ
ÿ057212672ÿ 182ÿ
6
"8621ÿ1272
1272ÿ0123ÿ09 ÿ !623ÿ 1272ÿ25ÿ2 ÿ1825ÿ5ÿ
1 825ÿ5ÿ0567819ÿ1ÿÿ 0567819ÿ1ÿÿ057212672ÿ
057212672ÿ 18 18
219
Página 244
City Clerk
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 % DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 388,566 426,200 426,200 440,500 440,500 3%
MATERIALS & SUPPLIES 8,710 7,100 7,100 7,200 7,200 1%
ADMINISTRATIVE EXPENDITURES 30,992 53,500 53,500 45,200 45,200 -16%
TOTAL EXPENDITURES $ 428,268 $ 486,800 $ 486,800 $ 492,900 $ 492,900 1%
Highlights:
No planned elections for FY26 – reducing expenditures from FY25.
220
Página 245
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
CITY CLERK 100-10-11-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 261,657 | $ | 273,000 | $ | 273,000 | $ | 295,900 | $ | 295,900 | 8% |
| FICA TAXES | 19,252 | 20,900 | 20,900 | 22,600 | 22,600 | 8% | |||||
| HEALTH INSURANCE | 78,089 | 113,300 | 113,300 | 104,000 | 104,000 | -8% | |||||
| L I D INSURANCE | 1,701 | 2,100 | 2,100 | 3,300 | 3,300 | 57% | |||||
| WORKERS COMPENSATION | 2,026 | 900 | 900 | 1,000 | 1,000 | 11% | |||||
| PENSION | 16,717 | 13,300 | 13,300 | 10,800 | 10,800 | -19% | |||||
| OPEB | 2,486 | 2,700 | 2,700 | 2,900 | 2,900 | 7% | |||||
| PERSONNEL COSTS | 388,566 | 426,200 | 426,200 | 440,500 | 440,500 | 3% |
| FURNITURE & FIXTURES | - | 400 | 400 | 200 | 200 | -50% |
| OFFICE SUPPLIES | 1,562 | 1,700 | 1,700 | 2,000 | 2,000 | 18% |
| PRINTING AND DUPLICATING | 2,839 | 500 | 500 | 500 | 500 | 0% |
| COMPUTER SOFTWARE | 387 | 300 | 300 | 300 | 300 | 0% |
| COMPUTER HARDWARE | 3,922 | 4,200 | 4,200 | 4,200 | 4,200 | 0% |
| MATERIALS & SUPPLIES | 8,710 | 7,100 | 7,100 | 7,200 | 7,200 | 1% |
| TELEPHONE/FAX | 1,863 | 1,300 | 1,300 | 1,900 | 1,900 | 46% |
| ADVERTISEMENT | 1,403 | 1,000 | 1,000 | 1,100 | 1,100 | 10% |
| SUBSCRIPTIONS AND DUES | 745 | 1,100 | 1,100 | 1,100 | 1,100 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 2,712 | 7,500 | 7,500 | 6,500 | 6,500 | -13% |
| CONTRACTUAL SERVICES | 24,268 | 32,300 | 32,300 | 32,300 | 32,300 | 0% |
| ELECTION RELATED EXPENSES | - | 10,000 | 10,000 | 2,000 | 2,000 | -80% |
| OFF EQUIP/REPAIRS & MAINT | - | 300 | 300 | 300 | 300 | 0% |
| ADMINISTRATIVE EXPENDITURES | 30,992 | 53,500 | 53,500 | 45,200 | 45,200 | -16% |
TOTAL EXPENDITURES $ 428,268 $ 486,800 $ 486,800 $ 492,900 $ 492,900 1%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 4.0 | 4.0 | 4.0 | 4.0 | 4.0 |
| BUDGETED PART-TIME POSITIONS | - | - | - | - | - |
221
Página 246
THIS PAGE INTENTIONALLY LEFT BLANK
222
Página 247
70ÿ7
011213453ÿ7238ÿ9454
7534ÿ 21ÿ2 3
025213432ÿ011213453
| 75343ÿÿ 53ÿ | 3ÿ 21ÿ72543 | 4422321ÿ9454 |
|---|---|---|
| 9454 | ||
| 3 ! "#8 ÿ | 9 &452ÿ | 74(31! 15ÿ |
| 3 ! "#8 ÿ | 9 &452ÿÿ$'% | 74(31! 15ÿ |
942ÿ7 ÿ$"% 32245ÿ 74(31! 15ÿÿ$)%
**+
Página 248
Procurement & Inventory
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 539,379 604,500 604,500 601,400 601,400 -1%
MATERIALS & SUPPLIES 8,338 12,400 12,400 15,900 15,900 28%
ADMINISTRATIVE EXPENDITURES 278,904 341,700 341,700 394,300 394,300 15%
OPERATING EXPENDITURES 826,622 958,600 958,600 1,011,600 1,011,600 6%
CAPITAL OUTLAY - 820,000 890,000 125,000 517,000 -37%
TOTAL EXPENDITURES $ 826,622 $ 1,778,600 $ 1,848,600 $ 1,136,600 $ 1,528,600 -14%
Highlights: Fuel Pump Island Upgrade had to have additional budget added to FY25 project (CS2502).
Continued increase in postage expense.
224
Página 249
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
PROCUREMENT & INVENTORY 100-15-27-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 362,099 | $ | 390,100 | $ | 390,100 | $ | 363,500 | $ | 363,500 | -7% |
| OVERTIME | 1,113 | 1,400 | 1,400 | 1,400 | 1,400 | 0% | |||||
| TEMPORARY HELP | 17,307 | 23,700 | 23,700 | 25,900 | 25,900 | 9% | |||||
| FICA TAXES | 28,693 | 31,800 | 31,800 | 29,900 | 29,900 | -6% | |||||
| HEALTH INSURANCE | 30,558 | 52,700 | 52,700 | 26,900 | 26,900 | -49% | |||||
| L I D INSURANCE | 1,933 | 2,200 | 2,200 | 3,600 | 3,600 | 64% | |||||
| WORKERS COMPENSATION | 1,233 | 1,300 | 1,300 | 1,300 | 1,300 | 0% | |||||
| EDUCATIONAL ASSISTANCE | - | 4,000 | 4,000 | 4,000 | 4,000 | 0% | |||||
| PENSION | 92,804 | 93,400 | 93,400 | 141,300 | 141,300 | 51% | |||||
| OPEB | 3,640 | 3,900 | 3,900 | 3,600 | 3,600 | -8% | |||||
| PERSONNEL COSTS | 539,379 | 604,500 | 604,500 | 601,400 | 601,400 | -1% |
| FURNITURE/FIXTURES | - | 300 | 300 | 200 | 200 | -33% |
| OFFICE SUPPLIES | 271 | 1,000 | 1,000 | 1,000 | 1,000 | 0% |
| PRINTING AND DUPLICATING | 2,989 | 3,000 | 3,000 | 3,000 | 3,000 | 0% |
| PROGRAM EXPENSES/SUPPLIES | 490 | 1,000 | 1,000 | 1,000 | 1,000 | 0% |
| UNIFORMS/UNIFORM ALLOW | 930 | 1,200 | 1,200 | 1,200 | 1,200 | 0% |
| SECURITY/SAFETY MATERIALS | 47 | 800 | 800 | 800 | 800 | 0% |
| CITY BLDG MAINT SUPPLIES | 681 | 1,100 | 1,100 | 5,700 | 5,700 | 418% |
| WATER/SEWER | 2,019 | 3,000 | 3,000 | 3,000 | 3,000 | 0% |
| MATERIALS & SUPPLIES | 8,338 | 12,400 | 12,400 | 15,900 | 15,900 | 28% |
| TELEPHONE/FAX | 3,474 | 2,400 | 2,400 | 4,500 | 4,500 | 88% |
| POSTAGE | 186,465 | 215,900 | 215,900 | 268,900 | 268,900 | 25% |
| ELECTRICITY | 50,219 | 73,000 | 64,500 | 73,000 | 73,000 | 0% |
| ADVERTISEMENT | 1,500 | 2,500 | 2,500 | 2,500 | 2,500 | 0% |
| SUBSCRIPTIONS AND DUES | 420 | 700 | 700 | 600 | 600 | -14% |
| TRAINING/CONF/FOOD/TRAVEL | 873 | 3,000 | 3,000 | 1,200 | 1,200 | -60% |
| CONTRACTUAL SERVICES | 30,292 | 36,900 | 45,400 | 34,500 | 34,500 | -7% |
| ENVIRONMENTAL EXPENSES | 3,710 | 4,500 | 4,500 | 5,600 | 5,600 | 24% |
| GASOLINE | 1,620 | 2,400 | 2,800 | 3,500 | 3,500 | 46% |
| ADMINISTRATIVE EXPENDITURES | 278,904 | 341,700 | 341,700 | 394,300 | 394,300 | 15% |
OPERATING EXPENDITURES 826,622 958,600 958,600 1,011,600 1,011,600 6%
| CONSTRUCTION - PURCHASE | - | 820,000 | 820,000 | 125,000 | 517,000 | -37% |
| CAPITAL OUTLAY | - | 820,000 | 890,000 | 125,000 | 517,000 | -37% |
TOTAL EXPENDITURES $ 826,622 $ 1,778,600 $ 1,848,600 $ 1,136,600 $ 1,528,600 -14%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 |
| BUDGETED PART-TIME POSITIONS | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 |
225
Página 250
THIS PAGE INTENTIONALLY LEFT BLANK
226
Página 251
Facilities Management
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 630,910 667,500 667,500 582,700 582,700 -13%
MATERIALS & SUPPLIES 19,224 33,600 33,600 35,000 35,000 4%
ADMINISTRATIVE EXPENDITURES 148,416 185,300 185,300 190,200 190,200 3%
OPERATING EXPENDITURES 798,550 886,400 886,400 807,900 807,900 -9%
CAPITAL OUTLAY 76,249 - 83,000 474,000 474,000 100%
TOTAL EXPENDITURES $ 874,799 $ 886,400 $ 969,400 $ 1,281,900 $ 1,281,900 45%
Highlights:
Facilities has three (recent) vacancies to fill for FY26 .
227
Página 252
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
FACILITIES MANAGEMENT 100-12-25-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 369,353 | $ | 406,900 | $ | 406,900 | $ | 344,400 | $ | 344,400 | -15% |
| OVERTIME | 1,309 | 8,100 | 8,100 | 7,500 | 7,500 | -7% | |||||
| FICA TAXES | 26,859 | 31,700 | 31,700 | 26,900 | 26,900 | -15% | |||||
| HEALTH INSURANCE | 79,102 | 117,600 | 117,600 | 87,600 | 87,600 | -26% | |||||
| L I D INSURANCE | 1,561 | 1,800 | 1,800 | 2,800 | 2,800 | 56% | |||||
| WORKERS COMPENSATION | 17,247 | 18,800 | 18,800 | 15,500 | 15,500 | -18% | |||||
| PENSION | 131,771 | 78,500 | 78,500 | 94,600 | 94,600 | 21% | |||||
| OPEB | 3,708 | 4,100 | 4,100 | 3,400 | 3,400 | -17% | |||||
| PERSONNEL COSTS | 630,910 | 667,500 | 667,500 | 582,700 | 582,700 | -13% |
| UNIFORMS/UNIFORM ALLOW | 2,432 | 3,300 | 3,300 | 4,800 | 4,800 | 45% |
| SECURITY/SAFETY MATERIALS | 503 | 1,300 | 1,300 | 500 | 500 | -62% |
| SMALL TOOLS | 1,402 | 4,400 | 4,400 | 8,000 | 8,000 | 82% |
| CITY BLDG MAINT SUPPLIES | 11,015 | 18,000 | 18,000 | 18,000 | 18,000 | 0% |
| WATER/SEWER | 1,717 | 1,500 | 1,500 | 1,500 | 1,500 | 0% |
| ELEC MATERIALS/SUPPLIES | 2,156 | 2,200 | 2,200 | 2,200 | 2,200 | 0% |
| MATERIALS & SUPPLIES | 19,224 | 33,600 | 33,600 | 35,000 | 35,000 | 4% |
| TELEPHONE/FAX | 745 | 500 | 500 | 1,000 | 1,000 | 100% |
| ELECTRICITY | 37,655 | 60,000 | 60,000 | 60,000 | 60,000 | 0% |
| HEATING OIL/GAS | 1,614 | 3,000 | 3,000 | 3,000 | 3,000 | 0% |
| SUBSCRIPTIONS & DUES | 50 | 100 | 100 | 800 | 800 | 700% |
| TRAINING/CONF/FOOD/TRAVEL | 139 | 200 | 200 | 200 | 200 | 0% |
| CONTRACTUAL SERVICES | 103,748 | 116,700 | 116,700 | 120,200 | 120,200 | 3% |
| GASOLINE | 4,464 | 4,800 | 4,800 | 5,000 | 5,000 | 4% |
| ADMINISTRATIVE EXPENDITURES | 148,416 | 185,300 | 185,300 | 190,200 | 190,200 | 3% |
OPERATING EXPENDITURES 798,550 886,400 886,400 807,900 807,900 -9%
| TRUCKS-PURCHASE | - | - | - | 64,000 | 64,000 | 100% |
| OTHER EPUIP - PURCHASE | - | - | - | 50,000 | 50,000 | 100% |
| CONSTRUCTION - PURCHASE | 76,249 | - | 83,000 | 360,000 | 360,000 | 100% |
| CAPITAL OUTLAY | 76,249 | - | 83,000 | 474,000 | 474,000 | 100% |
TOTAL EXPENDITURES $ 874,799 $ 886,400 $ 969,400 $ 1,281,900 $ 1,281,900 45%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 |
| PP/TEMP | - | - | - | - | - |
228
Página 253
Fleet Maintenance
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 534,993 560,200 560,200 594,400 594,400 6%
MATERIALS & SUPPLIES 492,675 507,400 507,400 526,100 526,100 4%
ADMINISTRATIVE EXPENDITURES 4,779 13,800 13,800 18,900 18,900 37%
OPERATING EXPENDITURES 1,032,448 1,081,400 1,081,400 1,139,400 1,139,400 5%
CAPITAL OUTLAY 488,690 - 505,700 44,100 44,100 100%
TOTAL EXPENDITURES $ 1,521,137 $ 1,081,400 $ 1,587,100 $ 1,183,500 $ 1,183,500 9%
Highlights:
No significant changes in departmental budget.
229
Página 254
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
FLEET MAINTENANCE 100-15-28-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED CHANGE | ||||||
| SALARIES | $ | 300,593 | $ | 316,900 | $ | 316,900 | $ | 334,700 | $ | 334,700 | 6% |
| OVERTIME | 4,429 | 5,100 | 5,100 | 5,300 | 5,300 | 4% | |||||
| FICA | 22,504 | 24,600 | 24,600 | 26,000 | 26,000 | 6% | |||||
| HEALTH INSURANCE | 64,459 | 72,400 | 72,400 | 66,500 | 66,500 | -8% | |||||
| LID | 1,458 | 1,600 | 1,600 | 2,900 | 2,900 | 81% | |||||
| WORKERS COMPENSATION | 16,858 | 17,800 | 17,800 | 18,800 | 18,800 | 6% | |||||
| PENSION | 121,616 | 118,600 | 118,600 | 136,900 | 136,900 | 15% | |||||
| OPEB | 3,076 | 3,200 | 3,200 | 3,300 | 3,300 | 3% | |||||
| PERSONNEL COSTS | 534,993 | 560,200 | 560,200 | 594,400 | 594,400 | 6% |
| OFFICE SUPPLIES | 921 | 1,200 | 1,200 | 1,200 | 1,200 | 0% |
| PROGRAM EXPENSES/SUPPLIES | 479,592 | 470,000 | 470,000 | 480,000 | 480,000 | 2% |
| UNIFORMS/UNIFORM ALLOW | - | 2,500 | 2,500 | 2,500 | 2,500 | 0% |
| SECURITY/SAFETY MATERIALS | 2,000 | 1,100 | 1,100 | 1,100 | 1,100 | 0% |
| SMALL TOOLS | 893 | 13,000 | 13,000 | 33,000 | 33,000 | 154% |
| COMPUTER SOFTWARE | 2,280 | 10,800 | 10,800 | 3,000 | 3,000 | -72% |
| CITY BLDG MAINT SUPPLIES | 4,213 | 5,300 | 5,300 | 5,300 | 5,300 | 0% |
| MATERIALS & SUPPLIES | 492,675 | 507,400 | 507,400 | 526,100 | 526,100 | 4% |
| TELEPHONE/FAX | 1,237 | 900 | 900 | 900 | 900 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 1199.95 | 10,100 | 10,100 | 11,100 | 11,100 | 10% |
| CONTRACTUAL SERVICES | 610 | 800 | 800 | 4,900 | 4,900 | 513% |
| ENVIRONMENTAL EXPENSES | 200 | 200 | 200 | 200 | 200 | 0% |
| GASOLINE | 1,532 | 1,800 | 1,800 | 1,800 | 1,800 | 0% |
| ADMINISTRATIVE EXPENDITURES | 4,779 | 13,800 | 13,800 | 18,900 | 18,900 | 37% |
OPERATING EXPENDITURES 1,032,448 1,081,400 1,081,400 1,139,400 1,139,400 5%
| AUTOMOBILES-PURCHASE | 348,478 | - | 358,500 | 34,100 | 34,100 | 100% |
| OTHER EQUIPMENT | 140,212 | - | 141,500 | - | - | 0% |
| CONSTRUCTION - PURCHASE | - | 5,700 | 10,000 | 10,000 | 100% | |
| CAPITAL OUTLAY | 488,690 | - | 505,700 | 44,100 | 44,100 | 100% |
TOTAL EXPENDITURES $ 1,521,137 $ 1,081,400 $ 1,587,100 $ 1,183,500 $ 1,183,500 9%
PERSONNEL BUDGETED FULL-TIME POSITIONS 5.0 5.0 5.0 5.0 5.0
230
Página 255
05ÿ
0
0123ÿ567689
0 29ÿ919ÿ192
17126219ÿ 12672
0619 117809217 0 29ÿ919 5929ÿ96178
| 72ÿ09 ÿ | 1178ÿ!91 | 0 29ÿ919ÿ | "19ÿ919ÿ9!ÿ |
|---|---|---|---|
| !91 | |||
| 72ÿ09 ÿ | 72ÿ09 ÿÿ#$% | 72ÿ09 ÿÿ#&% | "19ÿ919ÿ9!ÿÿ |
| #$% | |||
| 0 29ÿ919ÿ | 72ÿ09 ÿÿ#'% | "19ÿ919ÿ9!ÿÿ | |
| 09 ÿ | |||
| 231 | |||
Página 256
Customer Services
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 % DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 1,177,163 1,310,400 1,300,400 1,369,600 1,369,600 5%
MATERIALS & SUPPLIES 42,070 46,600 46,600 46,600 46,600 0%
ADMINISTRATIVE EXPENDITURES 61,135 99,800 99,800 101,200 96,200 -4%
TOTAL EXPENDITURES $ 1,280,368 $ 1,456,800 $ 1,446,800 $ 1,517,400 $ 1,512,400 4%
Highlights: Customer Service Director position still vacant, otherwise fully staffed.
Two approved promotions for Customer Service Clerk I’s.
232
Página 257
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
CUSTOMER SERVICES 100-16-29-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | |||||
|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | ||||
| SALARIES | $ | 759,328 $ | 807,200 | $ | 807,200 | $ | 854,400 | $ | 854,400 | 6% |
| OVERTIME | (332) | 10,500 | 10,500 | 3,300 | 3,300 | -69% | ||||
| FICA TAXES | 55,223 | 62,500 | 62,500 | 65,600 | 65,600 | 5% | ||||
| HEALTH INSURANCE | 152,998 | 229,800 | 229,800 | 207,000 | 207,000 | -10% | ||||
| L I D INSURANCE | 3,807 | 4,400 | 4,400 | 7,900 | 7,900 | 80% | ||||
| WORKERS COMPENSATION | 2,243 | 2,600 | 2,600 | 2,800 | 2,800 | 8% | ||||
| EDUCATIONAL ASSISTANCE | - | 10,000 | - | 5,000 | 5,000 | -50% | ||||
| PENSION | 196,304 | 175,500 | 175,500 | 215,100 | 215,100 | 23% | ||||
| OPEB | 7,590 | 7,900 | 7,900 | 8,500 | 8,500 | 8% | ||||
| PERSONNEL COSTS | 1,177,163 | 1,310,400 | 1,300,400 | 1,369,600 | 1,369,600 | 5% |
| FURNITURE/FIXTURES | 125 | 1,000 | 1,000 | 1,000 | 1,000 | 0% |
| OFFICE SUPPLIES | 16,085 | 18,500 | 18,500 | 18,500 | 18,500 | 0% |
| PRINTING AND DUPLICATING | 20,341 | 21,500 | 21,500 | 21,500 | 21,500 | 0% |
| COMPUTER HARDWARE | 5,519 | 5,600 | 5,600 | 5,600 | 5,600 | 0% |
| MATERIALS & SUPPLIES | 42,070 | 46,600 | 46,600 | 46,600 | 46,600 | 0% |
| TELEPHONE/FAX | 9,135 | 4,800 | 4,800 | 6,200 | 6,200 | 29% |
| TRAINING/CONF/FOOD/TRAVEL | 1,282 | 2,500 | 2,500 | 2,500 | 2,500 | 0% |
| CONTRACTUAL SERVICES | 39,256 | 78,000 | 78,000 | 78,000 | 73,000 | -6% |
| OFF EPUIP/REPAIRS & MAINT | 11,463 | 14,500 | 14,500 | 14,500 | 14,500 | 0% |
| ADMINISTRATIVE EXPENDITURES | 61,135 | 99,800 | 99,800 | 101,200 | 96,200 | -4% |
TOTAL EXPENDITURES $ 1,280,368 $ 1,456,800 $ 1,446,800 $ 1,517,400 $ 1,512,400 4%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 15.0 | 15.0 | 15.0 | 15.0 | 15.0 |
| BUDGETED PART-TIME POSITIONS | - | - | - | - | - |
233
Página 258
THIS PAGE INTENTIONALLY LEFT BLANK
234
Página 259
010230456ÿ1848301049ÿÿ
5 11 4589 4
8ÿ5ÿ1
0ÿ
0ÿÿ
ÿ
ÿÿ ÿÿ
1!!"ÿ 1!!"ÿ
ÿ#$%
235
Página 260
Life Safety
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 496,975 566,000 566,000 1,004,200 1,004,200 77%
MATERIALS & SUPPLIES 11,752 6,100 6,100 7,400 9,400 54%
ADMINISTRATIVE EXPENDITURES 344,089 650,400 650,400 650,600 650,500 0%
OPERATING EXPENDITURES 852,815 1,222,500 1,222,500 1,662,200 1,664,100 36%
CAPITAL OUTLAY - - - 155,200 - 0%
TOTAL EXPENDITURES $ 852,815 $ 1,222,500 $ 1,222,500 $ 1,817,400 $ 1,664,100 36%
Highlights: Public Affairs & Emergency Management Coordinator moved from City manager’s Office as new Emergency Services Director.
Life Safety Inspector III promoted to Emergency Services Deputy Director.
236
Página 261
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
LIFE SAFETY 100-11-16-13-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 307,639 | $ | 326,900 | $ | 326,900 | $ | 482,800 | $ | 482,800 | 48% |
| OVERTIME | 5,188 | 39,400 | 39,400 | 29,900 | 29,900 | -24% | |||||
| FICA TAXES | 22,671 | 28,100 | 28,100 | 39,200 | 39,200 | 40% | |||||
| HEALTH INSURANCE | 54,271 | 72,400 | 72,400 | 82,600 | 82,600 | 14% | |||||
| L I D INSURANCE | 1,377 | 1,600 | 1,600 | 4,000 | 4,000 | 150% | |||||
| WORKERS COMPENSATION | 2,208 | 2,500 | 2,500 | 3,000 | 3,000 | 20% | |||||
| EDUCATIONAL ASSISTANCE | - | - | - | 13,000 | 13,000 | 100% | |||||
| PENSION | 100,485 | 92,000 | 92,000 | 344,900 | 344,900 | 275% | |||||
| OPEB | 3,136 | 3,100 | 3,100 | 4,800 | 4,800 | 55% | |||||
| PERSONNEL COSTS | 496,975 | 566,000 | 566,000 | 1,004,200 | 1,004,200 | 77% |
| OFFICE SUPPLIES | - | - | - | - | 800 | 100% |
| PRINTING AND DUPLICATING | - | - | - | - | 800 | 100% |
| PROGRAM EXPENSES/SUPPLIES | 1,360 | 1,300 | 1,300 | 1,300 | 1,300 | 0% |
| UNIFORMS/UNIFORM ALLOW | 1,700 | 2,300 | 2,300 | 3,000 | 3,400 | 48% |
| BOOKS | 3,000 | 500 | 500 | 500 | 500 | 0% |
| SECURITY/SAFETY MATERIALS | 955 | 2,000 | 2,000 | 2,600 | 2,600 | 30% |
| MATERIALS & SUPPLIES | 11,752 | 6,100 | 6,100 | 7,400 | 9,400 | 54% |
| TELEPHONE/FAX | 3,411 | 2,800 | 2,800 | 3,000 | 3,000 | 7% |
| SUBSCRIPTIONS AND DUES | 3,125 | 3,500 | 3,500 | 3,500 | 3,500 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 7,207 | 8,500 | 8,500 | 8,500 | 8,100 | -5% |
| CONTRACTUAL SERVICES | 326,018 | 630,000 | 630,000 | 630,000 | 630,000 | 0% |
| GASOLINE | 4,130 | 5,000 | 5,000 | 5,000 | 5,300 | 6% |
| RADIO REPAIRS/MAINTENANCE | 50 | 600 | 600 | 600 | 600 | 0% |
| ADMINISTRATIVE EXPENDITURES | 344,089 | 650,400 | 650,400 | 650,600 | 650,500 | 0% |
OPERATING EXPENDITURES 852,815 1,222,500 1,222,500 1,662,200 1,664,100 36%
| AUTOMOBILE/PURCHASE | - | - | - | 155,200 | - | 0% | |||||
| CAPITAL OUTLAY | - | - | - | 155,200 | - | 0% | |||||
| 0% | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| TOTAL EXPENDITURES | $ | 852,815 | $ | 1,222,500 | $ | 1,222,500 | $ | 1,817,400 | $ | 1,664,100 | 36% |
PERSONNEL BUDGETED FULL-TIME POSITIONS 4.0 4.0 4.0 4.0 5.0
237
Página 262
THIS PAGE INTENTIONALLY LEFT BLANK
238
Página 263
0
0123ÿ0567819
0572599 6
1272ÿ0572599 177819ÿ5217ÿÿ
6 88567217ÿ7
3599ÿ81912 88567272ÿ
885672ÿ39 88567272ÿ
88567272ÿ
239
Página 264
Finance
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 % DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 651,135 841,200 841,200 855,200 855,200 2%
MATERIALS & SUPPLIES 9,738 9,200 9,200 10,200 10,200 11%
ADMINISTRATIVE EXPENDITURES 91,959 159,500 159,500 160,000 160,000 0%
TOTAL EXPENDITURES $ 752,831 $ 1,009,900 $ 1,009,900 $ 1,025,400 $ 1,025,400 2%
Highlights:
Vacant Accountant II position approved to be listed as Accountant III.
240
Página 265
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
FINANCE 100-16-23-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 424,582 | $ | 569,800 | $ | 569,800 | $ | 608,600 | $ | 608,600 | 7% |
| FICA TAXES | 30,765 | 43,600 | 43,600 | 46,500 | 46,500 | 7% | |||||
| HEALTH INSURANCE | 67,745 | 137,900 | 137,900 | 141,600 | 141,600 | 3% | |||||
| L I D INSURANCE | 2,007 | 3,800 | 3,800 | 6,200 | 6,200 | 63% | |||||
| WORKERS COMPENSATION | 1,367 | 1,800 | 1,800 | 1,900 | 1,900 | 6% | |||||
| EDUCATIONAL ASSISTANCE | - | - | - | 10,000 | 10,000 | 100% | |||||
| PENSION | 70,670 | 78,600 | 78,600 | 34,400 | 34,400 | -56% | |||||
| OPEB | 4,179 | 5,700 | 5,700 | 6,000 | 6,000 | 5% | |||||
| PERSONNEL COSTS | 651,135 | 841,200 | 841,200 | 855,200 | 855,200 | 2% |
| OFFICE SUPPLIES | 1,183 | 1,000 | 1,000 | 1,200 | 1,200 | 20% |
| PRINTING AND DUPLICATING | 5,505 | 4,700 | 4,700 | 5,500 | 5,500 | 17% |
| COMPUTER HARDWARE | 3,050 | 3,500 | 3,500 | 3,500 | 3,500 | 0% |
| MATERIALS & SUPPLIES | 9,738 | 9,200 | 9,200 | 10,200 | 10,200 | 11% |
| TELEPHONE/FAX | 4,008 | 2,500 | 2,500 | 4,000 | 4,000 | 60% |
| ADVERTISEMENT | - | 500 | 500 | 500 | 500 | 0% |
| SUBSCRIPTIONS AND DUES | 1,027 | 1,800 | 1,800 | 1,800 | 1,800 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 2,736 | 6,500 | 6,500 | 5,500 | 5,500 | -15% |
| CONTRACTUAL SERVICES | 84,187 | 146,200 | 146,200 | 146,200 | 146,200 | 0% |
| OFF EQUIP/REPAIRS & MAINT | - | 2,000 | 2,000 | 2,000 | 2,000 | 0% |
| ADMINISTRATIVE EXPENDITURES | 91,959 | 159,500 | 159,500 | 160,000 | 160,000 | 0% |
TOTAL EXPENDITURES $ 752,831 $ 1,009,900 $ 1,009,900 $ 1,025,400 $ 1,025,400 2%
PERSONNEL BUDGETED FULL-TIME POSITIONS 8.0 8.0 8.0 8.0 8.0
241
Página 266
THIS PAGE INTENTIONALLY LEFT BLANK
242
Página 267
ÿ
0123ÿ0567819
1 ÿ01ÿ59672
1 ÿ&'17ÿ1272 623ÿ1ÿ01ÿ
59672
1 ÿ128 ÿ 1272ÿ1 ÿ0 1ÿ
59672 ÿ#
1 ÿ128 ÿ7 1 ÿ$17ÿ0217ÿ
099ÿ!ÿ" 59672 ÿ%
243
Página 268
Fire
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 482,216 572,700 572,700 1,172,900 637,400 11%
MATERIALS & SUPPLIES - 1,600 7,100 78,300 14,800 825%
ADMINISTRATIVE EXPENDITURES 372,179 434,000 434,000 481,600 481,600 11%
OPERATING EXPENDITURES 854,396 1,008,300 1,013,800 1,732,800 1,133,800 12%
CAPITAL OUTLAY 371,760 566,600 614,400 569,500 569,500 1%
TOTAL EXPENDITURES $ 1,226,155 $ 1,574,900 $ 1,628,200 $ 2,302,300 $ 1,703,300 8%
Highlights:
Request for 5 Firefighter II’s denied.
Contractual Services increased by 11%, to include NFPA Physicals/Cancer Screenings.
244
Página 269
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
FIRE DEPARTMENT 100-11-14-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 296,772 | $ | 354,900 | $ | 354,900 | $ | 676,600 | $ | 407,600 | 15% |
| OVERTIME | 64,643 | 61,200 | 61,200 | 150,200 | 55,200 | -10% | |||||
| TEMPORARY HELP | 18,157 | 23,200 | 23,200 | 31,000 | 31,000 | 34% | |||||
| FICA TAXES | 28,863 | 33,600 | 33,600 | 58,200 | 37,700 | 12% | |||||
| HEALTH INSURANCE | 43,717 | 58,100 | 58,100 | 159,600 | 60,600 | 4% | |||||
| L I D INSURANCE | 1,323 | 1,000 | 1,000 | 5,700 | 3,200 | 220% | |||||
| WORKERS COMPENSATION | 2,461 | 5,800 | 5,800 | 19,000 | 3,000 | -48% | |||||
| PENSION | 22,059 | 32,100 | 32,100 | 66,000 | 35,000 | 9% | |||||
| OPEB | 4,222 | 2,800 | 2,800 | 6,600 | 4,100 | 46% | |||||
| PERSONNEL COSTS | 482,216 | 572,700 | 572,700 | 1,172,900 | 637,400 | 11% |
| PROGRAM EXPENSES/SUPPLIES | - | 1,600 | 1,600 | 12,700 | 12,700 | 694% |
| UNIFORMS/UNIFORM ALLOWANCE | - | 5,500 | 65,600 | 2,100 | 100% | |
| MATERIALS & SUPPLIES | - | 1,600 | 7,100 | 78,300 | 14,800 | 825% |
CONTRACTUAL SERVICES 372,179 434,000 434,000 481,600 481,600 11%
ADMINISTRATIVE EXPENDITURES 372,179 434,000 434,000 481,600 481,600 11%
OPERATING EXPENDITURES 854,396 1,008,300 1,013,800 1,732,800 1,133,800 12%
| OTHER EQUIP - PURCHASE | 371,760 | 566,600 | 614,400 | 569,500 | 569,500 | 1% |
| CAPITAL OUTLAY | 371,760 | 566,600 | 614,400 | 569,500 | 569,500 | 1% |
TOTAL EXPENDITURES $ 1,226,155 $ 1,574,900 $ 1,628,200 $ 2,302,300 $ 1,703,300 8%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 |
| BUDGETED PART-TIME POSITIONS | 9.0 | 9.0 | 9.0 | 9.0 | 9.0 |
245
Página 270
THIS PAGE INTENTIONALLY LEFT BLANK
246
Página 271
5ÿ
0
0123ÿ567689
67ÿ9 9ÿ192
ÿ01762
67ÿ9 9ÿ979612ÿ
247
Página 272
Human Resources
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 % DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 302,440 389,600 389,600 402,300 402,300 3%
MATERIALS & SUPPLIES 46,298 44,700 44,700 48,200 48,200 8%
ADMINISTRATIVE EXPENDITURES 24,598 43,700 43,700 44,700 44,700 2%
TOTAL EXPENDITURES $ 373,335 $ 478,000 $ 478,000 $ 495,200 $ 495,200 4%
Highlights:
HR looking to fill two vacancies (one recent) in FY26.
248
Página 273
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
HUMAN RESOURCES 100-10-31-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 223,963 | $ | 289,200 | $ | 289,200 | $ | 314,400 | $ | 314,400 | 9% |
| FICA TAXES | 16,412 | 22,100 | 22,100 | 24,000 | 24,000 | 9% | |||||
| HEALTH INSURANCE | 44,672 | 53,200 | 53,200 | 34,100 | 34,100 | -36% | |||||
| L I D INSURANCE | 1,562 | 2,100 | 2,100 | 3,500 | 3,500 | 67% | |||||
| WORKERS COMPENSATION | 726 | 900 | 900 | 1,000 | 1,000 | 11% | |||||
| EDUCATIONAL ASSISTANCE | - | 2,500 | 2,500 | 2,500 | 2,500 | 0% | |||||
| PENSION | 12,867 | 16,800 | 16,800 | 19,700 | 19,700 | 17% | |||||
| OPEB | 2,239 | 2,800 | 2,800 | 3,100 | 3,100 | 11% | |||||
| PERSONNEL COSTS | 302,440 | 389,600 | 389,600 | 402,300 | 402,300 | 3% |
| OFFICE SUPPLIES | 2,523 | 2,000 | 2,000 | 2,000 | 2,000 | 0% |
| PRINTING AND DUPLICATING | 2,405 | 3,200 | 3,200 | 3,200 | 3,200 | 0% |
| MEDICAL SUP & PHYSICALS | 9,986 | 11,000 | 11,000 | 12,000 | 12,000 | 9% |
| SECURITY/SAFETY MATERIALS | 2,558 | 1,000 | 1,000 | 1,000 | 1,000 | 0% |
| COMPUTER HARDWARE | 2,881 | 500 | 500 | 3,000 | 3,000 | 500% |
| PERSONNEL RELATED SUP | 25,247 | 27,000 | 27,000 | 27,000 | 27,000 | 0% |
| MATERIALS & SUPPLIES | 46,298 | 44,700 | 44,700 | 48,200 | 48,200 | 8% |
| TELEPHONE/FAX | 1,863 | 1,200 | 1,200 | 2,200 | 2,200 | 83% |
| ADVERTISEMENT | 5,769 | 6,000 | 6,000 | 6,000 | 11,000 | 83% |
| SUBSCRIPTIONS AND DUES | 642 | 500 | 500 | 500 | 500 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 5,993 | 10,000 | 10,000 | 10,000 | 5,000 | -50% |
| CONSULTING FEES | 8,751 | 15,000 | 15,000 | 15,000 | 15,000 | 0% |
| CONTRACTUAL SERVICES | 800 | 1,000 | 1,000 | 1,000 | 1,000 | 0% |
| UNEMPLOYMENT COMP EXPENSE | - | 10,000 | 10,000 | 10,000 | 10,000 | 0% |
| ADMINISTRATIVE EXPENDITURES | 24,598 | 43,700 | 43,700 | 44,700 | 44,700 | 2% |
TOTAL EXPENDITURES $ 373,335 $ 478,000 $ 478,000 $ 495,200 $ 495,200 4%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 4.0 | 4.0 | 4.0 | 4.0 | 4.0 |
| BUDGETED PART-TIME POSITIONS | - | - | - | - | - |
249
Página 274
THIS PAGE INTENTIONALLY LEFT BLANK
250
Página 275
5ÿ
0
0123ÿ567689
7 6217ÿ9783ÿ192
971ÿÿ7632 971 ÿ# 86ÿ7632
ÿ7632ÿ!"
251
Página 276
Information Technology
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 533,878 604,500 604,500 716,900 716,900 19%
MATERIALS & SUPPLIES 68,838 70,000 70,000 72,000 72,000 3%
ADMINISTRATIVE EXPENDITURES 207,950 246,000 246,000 256,800 256,800 4%
OPERATING EXPENSES 810,666 920,500 920,500 1,045,700 1,045,700 14%
CAPITAL OUTLAY 48,392 112,000 172,000 110,700 110,700 -1%
TOTAL EXPENDITURES $ 859,058 $ 1,032,500 $ 1,092,500 $ 1,156,400 $ 1,156,400 12%
Highlights:
New IT Director hired, still 2 vacant positions to be filled in FY26.
252
Página 277
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
INFORMATION TECHNOLOGY 100-16-22-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 359,983 | $ | 385,200 | $ | 385,200 | $ | 427,800 | $ | 427,800 | 11% |
| OVERTIME | 1,634 | 1,200 | 1,200 | 1,600 | 1,600 | 33% | |||||
| FICA TAXES | 26,631 | 29,500 | 29,500 | 32,800 | 32,800 | 11% | |||||
| HEALTH INSURANCE | 63,095 | 92,800 | 92,800 | 96,100 | 96,100 | 4% | |||||
| L I D INSURANCE | 1,872 | 2,100 | 2,100 | 3,900 | 3,900 | 86% | |||||
| WORKERS COMPENSATION | 1,172 | 1,300 | 1,300 | 1,400 | 1,400 | 8% | |||||
| EDUCATIONAL ASSISTANCE | - | 5,000 | 5,000 | 4,500 | 4,500 | -10% | |||||
| PENSION | 75,875 | 83,500 | 83,500 | 144,500 | 144,500 | 73% | |||||
| OPEB | 3,616 | 3,900 | 3,900 | 4,300 | 4,300 | 10% | |||||
| PERSONNEL COSTS | 533,878 | 604,500 | 604,500 | 716,900 | 716,900 | 19% |
| OFFICE SUPPLIES | 722 | 1,100 | 1,100 | 1,300 | 1,300 | 18% |
| DATA PROCESSING SUPPLIES | 259 | 300 | 300 | 200 | 200 | -33% |
| COMPUTER SOFTWARE | 65,506 | 67,000 | 67,000 | 70,000 | 70,000 | 4% |
| COMPUTER HARDWARE | 2,352 | 1,600 | 1,600 | 500 | 500 | -69% |
| MATERIALS & SUPPLIES | 68,838 | 70,000 | 70,000 | 72,000 | 72,000 | 3% |
| TELEPHONE/FAX | 5,219 | 3,100 | 3,100 | 3,100 | 3,100 | 0% |
| SUBSCRIPTIONS AND DUES | 5,030 | 9,600 | 9,600 | 6,500 | 6,500 | -32% |
| TRAINING/CONF/FOOD/TRAVEL | 1,719 | 8,900 | 8,900 | 2,500 | 2,500 | -72% |
| CONTRACTUAL SERVICES | 38,914 | 76,700 | 76,700 | 73,000 | 73,000 | -5% |
| OFF EPUIP/REPAIRS & MAINT | 157,034 | 147,400 | 147,400 | 171,400 | 171,400 | 16% |
| GASOLINE | 34 | 300 | 300 | 300 | 300 | 0% |
| ADMINISTRATIVE EXPENDITURES | 207,950 | 246,000 | 246,000 | 256,800 | 256,800 | 4% |
OPERATING EXPENSES 810,666 920,500 920,500 1,045,700 1,045,700 14%
| OTHER EQUIP - PURCHASE | 21,941 | - | - | 110,700 | 110,700 | 100% |
| COMPUTER HARDWARE/CAPITAL | 26,451 | 112,000 | 172,000 | - | - | -100% |
| CAPITAL OUTLAY | 48,392 | 112,000 | 172,000 | 110,700 | 110,700 | -1% |
TOTAL EXPENDITURES $ 859,058 $ 1,032,500 $ 1,092,500 $ 1,156,400 $ 1,156,400 12%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 5.0 | 5.0 | 5.0 | 5.0 | 5.0 |
| BUDGETED PART-TIME POSITIONS | - | - | - | - |
253
Página 278
THIS PAGE INTENTIONALLY LEFT BLANK
254
Página 279
0123ÿ567689
1 63ÿ192
(29ÿ919
'17126219ÿ12672
$6)2ÿ09&ÿ!*#
2ÿ919 2ÿ919 9716ÿ919 016217ÿ919 2ÿ1 63ÿ192ÿÿ 96ÿÿ2ÿ919ÿÿ 96ÿÿ9716ÿ 96ÿÿ016217ÿÿ 1 6167ÿ 1 6167ÿ 919ÿÿ1 6167ÿ 1 6167ÿ 1 6167ÿ 1 6167ÿÿ 1 63ÿ2 163ÿ09&ÿ !"#ÿÿ!$# "ÿ1 63ÿ2ÿ 163ÿ2 1 63ÿ09&ÿ %!"#ÿ%!$# !"#ÿ+!$# 1 63ÿ2ÿ %ÿ!$# 1 63ÿ$689ÿ!,#
255
Página 280
Library
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 % DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 1,514,887 1,738,000 1,738,000 1,969,400 1,969,400 13%
MATERIALS & SUPPLIES 72,830 81,100 81,100 80,400 80,400 -1%
ADMINISTRATIVE EXPENDITURES 317,204 326,900 326,900 324,000 324,000 -1%
TOTAL EXPENDITURES $ 1,904,921 $ 2,146,000 $ 2,146,000 $ 2,373,800 $ 2,373,800 11%
Highlights:
No significant changes to departmental budget.
256
Página 281
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
LIBRARY 100-13-15-11-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 851,426 | $ | 811,400 | $ | 811,400 | $ | 878,400 | $ | 878,400 | 8% |
| TEMPORARY HELP | 187,984 | 347,000 | 347,000 | 368,100 | 368,100 | 6% | |||||
| FICA TAXES | 75,411 | 88,600 | 88,600 | 95,300 | 95,300 | 8% | |||||
| HEALTH INSURANCE | 176,472 | 270,700 | 270,700 | 275,600 | 275,600 | 2% | |||||
| L I D INSURANCE | 3,921 | 4,300 | 4,300 | 7,800 | 7,800 | 81% | |||||
| WORKERS COMPENSATION | 9,049 | 10,700 | 10,700 | 11,400 | 11,400 | 7% | |||||
| PENSION | 203,655 | 194,700 | 194,700 | 324,100 | 324,100 | 66% | |||||
| OPEB | 6,970 | 8,100 | 8,100 | 8,700 | 8,700 | 7% | |||||
| PERSONNEL COSTS | 1,514,887 | 1,738,000 | 1,738,000 | 1,969,400 | 1,969,400 | 13% |
| PROGRAM EXPENSES/SUPPLIES | 5,999 | 6,000 | 6,000 | 6,000 | 6,000 | 0% |
| BOOKS | 54,000 | 54,000 | 54,000 | 54,000 | 54,000 | 0% |
| SECURITY/SAFETY MATERIALS | 450 | 2,000 | 2,000 | 1,300 | 1,300 | -35% |
| COMPUTER SOFTWARE | - | 400 | 400 | 400 | 400 | 0% |
| COMPUTER HARDWARE | 318 | 1,000 | 1,000 | 1,000 | 1,000 | 0% |
| CITY BLDG MAINT SUPPLIES | 11,952 | 17,500 | 17,500 | 17,500 | 17,500 | 0% |
| WATER/SEWER | 110 | 200 | 200 | 200 | 200 | 0% |
| MATERIALS & SUPPLIES | 72,830 | 81,100 | 81,100 | 80,400 | 80,400 | -1% |
| TELEPHONE/FAX | 13,045 | 7,700 | 7,700 | 7,700 | 7,700 | 0% |
| ELECTRICITY | 63,750 | 75,000 | 75,000 | 69,000 | 69,000 | -8% |
| HEATING OIL/GAS | 18,446 | 18,500 | 18,500 | 21,500 | 21,500 | 16% |
| SUBSCRIPTIONS AND DUES | 11,000 | 11,000 | 11,000 | 11,000 | 11,000 | 0% |
| CONTRACTUAL SERVICES | 210,963 | 214,700 | 214,700 | 214,800 | 214,800 | 0% |
| ADMINISTRATIVE EXPENDITURES | 317,204 | 326,900 | 326,900 | 324,000 | 324,000 | -1% |
TOTAL EXPENDITURES $ 1,904,921 $ 2,146,000 $ 2,146,000 $ 2,373,800 $ 2,373,800 11%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 14.0 | 14.0 | 14.0 | 14.0 | 14.0 |
| BUDGETED PART-TIME POSITIONS | 18.0 | 18.0 | 18.0 | 18.0 | 18.0 |
257
Página 282
THIS PAGE INTENTIONALLY LEFT BLANK
258
Página 283
0ÿ
ÿÿ70
011213453ÿ7238ÿ9454
025213432ÿ
011213453
41ÿÿÿ#23
41ÿ42238ÿÿ 4325ÿ 31ÿ72543 4325ÿ753 ÿ +%51 94253545ÿ!" 24213 72543ÿ$" 2ÿ% 21 48 %5ÿ&4 ÿÿ 48 %5ÿ4 ÿÿ ))2ÿ011213453 ÿ'"ÿ(" ÿ'"ÿ(" *%225ÿ% 21ÿ'"ÿ 7 ,ÿ&4 0-213ÿ." $" 2ÿ753 ÿ7ÿ'"ÿ +45 ÿ &4ÿ&4- ÿ$" !" 9ÿÿ!" +45 ÿ /ÿ525 ÿ9 0452 &4- ÿÿ!"
259
Página 284
Parks & Recreation
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 1,117,144 1,226,500 1,236,500 1,300,700 1,300,700 6%
MATERIALS & SUPPLIES 92,212 93,700 93,700 96,200 96,200 3%
ADMINISTRATIVE EXPENDITURES 237,347 253,100 253,100 256,400 256,400 1%
OPERATING EXPENDITURES 1,446,704 1,573,300 1,583,300 1,653,300 1,653,300 5%
CAPITAL OUTLAY 2,029,883 1,160,000 2,029,800 330,000 330,000 -72%
TOTAL EXPENDITURES $ 3,476,587 $ 2,733,300 $ 3,613,100 $ 1,983,300 $ 1,983,300 -27%
Highlights: Capital project decrease due to work at Dover Park (park building, splash pad, and accessible playground) and Schutte Park (skate park) continuing in FY26.
260
Página 285
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
RECREATION 100-13-15-12-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED CHANGE | ||||||
| SALARIES | $ | 649,939 | $ | 631,300 | $ | 631,300 | $ | 628,500 | $ | 628,500 | 0% |
| OVERTIME | 8,524 | 6,400 | 6,400 | 10,000 | 10,000 | 56% | |||||
| TEMPORARY HELP | 79,245 | 183,100 | 183,100 | 180,900 | 180,900 | -1% | |||||
| FICA TAXES | 54,740 | 62,800 | 62,800 | 62,700 | 62,700 | 0% | |||||
| HEALTH INSURANCE | 102,514 | 130,000 | 130,000 | 163,500 | 163,500 | 26% | |||||
| L I D INSURANCE | 3,003 | 4,000 | 4,000 | 6,300 | 6,300 | 58% | |||||
| WORKERS COMPENSATION | 9,971 | 10,300 | 10,300 | 11,000 | 11,000 | 7% | |||||
| EDUCATIONAL ASSISTANCE | - | - | 10,000 | 5,000 | 5,000 | 100% | |||||
| PENSION | 203,494 | 192,800 | 192,800 | 227,100 | 227,100 | 18% | |||||
| OPEB | 5,716 | 5,800 | 5,800 | 5,700 | 5,700 | -2% | |||||
| PERSONNEL COSTS | 1,117,144 | 1,226,500 | 1,236,500 | 1,300,700 | 1,300,700 | 6% |
| FURNITURE/FIXTURES | 905 | 1,000 | 1,000 | 1,000 | 1,000 | 0% |
| OFFICE SUPPLIES | 2,190 | 2,200 | 2,200 | 2,500 | 2,500 | 14% |
| PRINTING AND DUPLICATING | 2,597 | 2,800 | 2,800 | 3,500 | 3,500 | 25% |
| PROGRAM EXPENSES/SUPPLIES | 61,419 | 60,000 | 60,000 | 60,000 | 60,000 | 0% |
| UNIFORMS/UNIFORM ALLOW | 1,767 | 1,800 | 1,800 | 2,500 | 2,500 | 39% |
| SECURITY/SAFETY MATERIALS | 456 | 600 | 600 | 600 | 600 | 0% |
| SMALL TOOLS | 1,500 | 1,500 | 1,500 | 1,500 | 1,500 | 0% |
| COMPUTER SOFTWARE | 7,081 | 7,400 | 7,400 | 7,400 | 7,400 | 0% |
| COMPUTER HARDWARE | 2,661 | 3,200 | 3,200 | 4,000 | 4,000 | 25% |
| CITY BLDG MAINT SUPPLIES | 10,376 | 10,400 | 10,400 | 10,400 | 10,400 | 0% |
| WATER/SEWER | 1,261 | 2,800 | 2,800 | 2,800 | 2,800 | 0% |
| MATERIALS & SUPPLIES | 92,212 | 93,700 | 93,700 | 96,200 | 96,200 | 3% |
| TELEPHONE/FAX | 5,954 | 4,300 | 4,300 | 5,500 | 5,500 | 28% |
| ELECTRICITY | 57,856 | 70,000 | 70,000 | 70,000 | 70,000 | 0% |
| HEATING OIL/GAS | 7,022 | 12,000 | 12,000 | 12,000 | 12,000 | 0% |
| SUBSCRIPTIONS AND DUES | 2,849 | 3,300 | 3,300 | 3,000 | 3,000 | -9% |
| TRAINING/CONF/FOOD/TRAVEL | 3,662 | 4,400 | 4,400 | 4,400 | 4,400 | 0% |
| CONTRACTUAL SERVICES | 143,885 | 144,000 | 144,000 | 146,500 | 146,500 | 2% |
| OFF EQUIP/REPAIRS & MAINT | 142 | 1,100 | 1,100 | 1,000 | 1,000 | -9% |
| GASOLINE | 10,058 | 9,000 | 9,000 | 9,000 | 9,000 | 0% |
| AUTO REPAIRS/MAINTENANCE | 5,919 | 5,000 | 5,000 | 5,000 | 5,000 | 0% |
| ADMINISTRATIVE EXPENDITURES | 237,347 | 253,100 | 253,100 | 256,400 | 256,400 | 1% |
OPERATING EXPENDITURES 1,446,704 1,573,300 1,583,300 1,653,300 1,653,300 5%
| AUTOMOBILES | 77,252 | 60,000 | 60,000 | - | - | -100% |
| OTHER EQUIP - PURCHASE | 34,139 | - | - | 65,000 | 65,000 | 100% |
| CONSTRUCTION - PURCHASE | 1,918,493 | 1,100,000 | 1,969,800 | 265,000 | 265,000 | -76% |
| CAPITAL OUTLAY | 2,029,883 | 1,160,000 | 2,029,800 | 330,000 | 330,000 | -72% |
TOTAL EXPENDITURES $ 3,476,587 $ 2,733,300 $ 3,613,100 $ 1,983,300 $ 1,983,300 -27%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 |
| PP/TEMP | 15.0 | 15.0 | 15.0 | 15.0 | 15.0 |
261
Página 286
Grounds
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 1,260,351 1,420,700 1,420,700 1,676,600 1,676,600 18%
MATERIALS & SUPPLIES 78,321 80,800 80,800 85,900 85,900 6%
ADMINISTRATIVE EXPENDITURES 264,455 287,000 287,000 284,800 284,800 -1%
OPERATING EXPENSES 1,603,126 1,788,500 1,788,500 2,047,300 2,047,300 14%
CAPITAL OUTLAY 236,160 80,000 80,000 85,000 85,000 6%
TOTAL EXPENDITURES $ 1,839,286 $ 1,868,500 $ 1,868,500 $ 2,132,300 $ 2,132,300 14%
Highlights:
One vacant position to be filled in FY26.
262
Página 287
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
GROUNDS 100-12-18-51-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED CHANGE | ||||||
| SALARIES | $ | 716,057 | $ | 791,600 | $ | 791,600 | $ | 827,100 | $ | 827,100 | 4% |
| OVERTIME | 22,661 | 27,200 | 27,200 | 28,400 | 28,400 | 4% | |||||
| FICA TAXES | 53,355 | 62,600 | 62,600 | 65,400 | 65,400 | 4% | |||||
| HEALTH INSURANCE | 161,461 | 235,400 | 235,400 | 266,700 | 266,700 | 13% | |||||
| L I D INSURANCE | 3,178 | 3,300 | 3,300 | 7,000 | 7,000 | 112% | |||||
| WORKERS COMPENSATION | 40,977 | 45,300 | 45,300 | 47,400 | 47,400 | 5% | |||||
| PENSION | 255,266 | 247,400 | 247,400 | 426,300 | 426,300 | 72% | |||||
| OPEB | 7,397 | 7,900 | 7,900 | 8,300 | 8,300 | 5% | |||||
| PERSONNEL COSTS | 1,260,351 | 1,420,700 | 1,420,700 | 1,676,600 | 1,676,600 | 18% |
| CUSTODIAL | 346 | 400 | 400 | 400 | 400 | 0% |
| PROGRAM EXPENSES/SUPPLIES | 59,069 | 61,000 | 61,000 | 61,000 | 61,000 | 0% |
| UNIFORMS/UNIFORM ALLOW | 7,022 | 6,900 | 6,900 | 9,200 | 9,200 | 33% |
| SECURITY/SAFETY MATERIALS | 2,688 | 2,700 | 2,700 | 2,700 | 2,700 | 0% |
| SMALL TOOLS | 4,963 | 5,000 | 5,000 | 5,000 | 5,000 | 0% |
| COMPUTER HARDWARE | - | - | - | 3,000 | 3,000 | 100% |
| SAND AND SALT | 853 | 400 | 400 | 400 | 400 | 0% |
| CITY BLDG MAINT SUPPLIES | 490 | 700 | 700 | 500 | 500 | -29% |
| WATER/SEWER | 2,889 | 3,700 | 3,700 | 3,700 | 3,700 | 0% |
| MATERIALS & SUPPLIES | 78,321 | 80,800 | 80,800 | 85,900 | 85,900 | 6% |
| TELEPHONE/FAX | 936 | 800 | 800 | 1,100 | 1,100 | 38% |
| ELECTRICITY | 5,595 | 5,000 | 5,000 | 5,500 | 5,500 | 10% |
| HEATING OIL/GAS | 3,461 | 3,500 | 3,500 | 3,500 | 3,500 | 0% |
| SUBSCRIPTIONS AND DUES | 100 | 100 | 100 | 100 | 100 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 1,461 | 1,700 | 1,700 | 1,700 | 1,700 | 0% |
| CONTRACTUAL SERVICES | 206,471 | 220,000 | 220,000 | 220,000 | 220,000 | 0% |
| ENVIRONMENTAL EXPENSES | - | 900 | 900 | 900 | 900 | 0% |
| GASOLINE | 30,029 | 40,000 | 40,000 | 37,000 | 37,000 | -8% |
| MAINT EQUIP REPAIRS/MAINT | 16,403 | 15,000 | 15,000 | 15,000 | 15,000 | 0% |
| ADMINISTRATIVE EXPENDITURES | 264,455 | 287,000 | 287,000 | 284,800 | 284,800 | -1% |
OPERATING EXPENSES 1,603,126 1,788,500 1,788,500 2,047,300 2,047,300 14%
| TRUCKS - PURCHASE | 142,590 | 80,000 | 80,000 | 85,000 | 85,000 | 6% |
| MAINT EQUIP - PURCHASE | 93,570 | - | - | - | - | 0% |
| CAPITAL OUTLAY | 236,160 | 80,000 | 80,000 | 85,000 | 85,000 | 6% |
TOTAL EXPENDITURES $ 1,839,286 $ 1,868,500 $ 1,868,500 $ 2,132,300 $ 2,132,300 14%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 14.0 | 14.0 | 14.0 | 14.0 | 14.0 |
| BUDGETED PART-TIME POSITIONS | - | - | - | - | - |
263
Página 288
THIS PAGE INTENTIONALLY LEFT BLANK
264
Página 289
0ÿ7ÿÿ
7 99!"ÿ# 9
011213453ÿ7238ÿ9454
2 3ÿÿ45525ÿ513251ÿÿ
75238ÿ 53
| 45525 | 231$513251ÿ | 7%ÿ5 53 |
|---|---|---|
| ÿ25125 | ||
| 2524ÿ455 | 7&2ÿ'2%25ÿ | 513ÿÿ(+* |
| 513 | ||
| 7ÿ ÿ9454 | 513ÿÿ()* | 513ÿÿ()* |
| 455 ÿ | 25125$ 23325ÿ | 513ÿÿ(,* |
| 21 | ||
| 455 ÿ | 2ÿ011213453ÿÿ | |
| ()* | ||
| 0%25ÿ011213453 | ||
| 265 | ||
Página 290
Planning
2024-2025 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 538,649 799,100 783,100 977,000 977,000 22%
MATERIALS & SUPPLIES 9,782 25,800 25,800 28,600 27,000 5%
ADMINISTRATIVE EXPENDITURES 67,106 73,900 89,900 75,800 75,800 3%
OPERATING EXPENDITURES 615,537 898,800 898,800 1,081,400 1,079,800 20%
TOTAL EXPENDITURES $ 615,537 $ 898,800 $ 898,800 $ 1,081,400 $ 1,079,800 20%
Highlights: Planning Director and Planner I positions vacant for FY26 – using consultant service to bridge the gap.
Budgeted overlap for training for new Community Development Manager.
266
Página 291
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
PLANNING 100-10-16-21-000
| 2024-2025 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||
|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |
| SALARIES | $ | 344,156 $ | 491,400 $ | 475,400 $ | 573,100 $ | 573,100 | 17% |
| OVERTIME | 9,296 | 11,700 | 11,700 | 13,000 | 13,000 | 11% | |
| TEMPORARY HELP | 7,800 | 9,000 | 9,000 | 9,000 | 9,000 | 0% | |
| FICA TAXES | 26,143 | 39,200 | 39,200 | 44,700 | 44,700 | 14% | |
| HEALTH INSURANCE | 65,480 | 139,500 | 139,500 | 127,200 | 127,200 | -9% | |
| L I D INSURANCE | 1,576 | 2,200 | 2,200 | 4,800 | 4,800 | 118% | |
| WORKERS COMPENSATION | 1,170 | 1,700 | 1,700 | 1,800 | 1,800 | 6% | |
| PENSION | 130,356 | 134,500 | 134,500 | 233,200 | 233,200 | 73% | |
| OPEB | 3,540 | 4,900 | 4,900 | 5,200 | 5,200 | 6% | |
| COSTS ALLOCATED TO CDBG | (50,869) | (35,000) | (35,000) | (35,000) | (35,000) | 0% | |
| PERSONNEL COSTS | 538,649 | 799,100 | 783,100 | 977,000 | 977,000 | 22% |
| OFFICE SUPPLIES | 3,336 | 4,800 | 4,800 | 6,000 | 5,200 | 8% |
| PRINTING AND DUPLICATING | 2,946 | 6,500 | 6,500 | 6,500 | 5,700 | -12% |
| PROGRAM EXPENSES | - | 11,300 | 11,300 | 11,000 | 11,000 | -3% |
| UNIFORMS/UNIFORM ALLOW | - | 200 | 200 | 500 | 500 | 150% |
| BOOKS | 570 | 900 | 900 | 900 | 900 | 0% |
| COMPUTER SOFTWARE | 119 | 200 | 200 | 200 | 200 | 0% |
| COMPUTER HARDWARE | 2,812 | 1,900 | 1,900 | 3,500 | 3,500 | 84% |
| MATERIALS & SUPPLIES | 9,782 | 25,800 | 25,800 | 28,600 | 27,000 | 5% |
| TELEPHONE/FAX | 3,691 | 2,500 | 2,500 | 3,400 | 3,400 | 36% |
| ADVERTISEMENT | 1,101 | 2,800 | 2,800 | 3,800 | 3,800 | 36% |
| SUBSCRIPTIONS AND DUES | 2,130 | 2,200 | 2,200 | 2,200 | 2,200 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 2,494 | 6,400 | 6,400 | 6,400 | 6,400 | 0% |
| CONTRACTUAL SERVICES | 57,690 | 60,000 | 76,000 | 60,000 | 60,000 | 0% |
| ADMINISTRATIVE EXPENDITURES | 67,106 | 73,900 | 89,900 | 75,800 | 75,800 | 3% |
OPERATING EXPENDITURES 615,537 898,800 898,800 1,081,400 1,079,800 20%
TOTAL EXPENDITURES $ 615,537 $ 898,800 $ 898,800 $ 1,081,400 $ 1,079,800 20%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 |
| PP/TEMP/COMMITTEES | 14.0 | 14.0 | 14.0 | 14.0 | 14.0 |
267
Página 292
Inspections & Permitting
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 % DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 687,911 715,000 715,000 627,100 627,100 -12%
MATERIALS & SUPPLIES 5,400 5,300 5,300 10,400 8,700 64%
ADMINISTRATIVE EXPENDITURES 39,738 47,100 49,100 62,600 133,300 183%
TOTAL EXPENDITURES $ 763,116 $ 767,400 $ 769,400 $ 700,100 $ 769,100 0%
Highlights:
Regrading of Building Inspections I & II, in FY26.
May opt to continue with Consultant Service with inability to find a Building Inspector III (vacated in FY25).
268
Página 293
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
INSPECTIONS 100-11-16-22-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 349,715 | $ | 383,900 | $ | 383,900 | $ | 361,600 | $ | 361,600 | -6% |
| OVERTIME | 6,316 | 7,300 | 7,300 | 13,000 | 13,000 | 78% | |||||
| FICA TAXES | 25,570 | 29,900 | 29,900 | 28,600 | 28,600 | -4% | |||||
| HEALTH INSURANCE | 86,423 | 121,900 | 121,900 | 95,400 | 95,400 | -22% | |||||
| L I D INSURANCE | 1,468 | 1,700 | 1,700 | 3,000 | 3,000 | 76% | |||||
| WORKERS COMPENSATION | 1,855 | 2,100 | 2,100 | 1,900 | 1,900 | -10% | |||||
| PENSION | 213,000 | 164,400 | 164,400 | 120,000 | 120,000 | -27% | |||||
| OPEB | 3,565 | 3,800 | 3,800 | 3,600 | 3,600 | -5% | |||||
| PERSONNEL COSTS | 687,911 | 715,000 | 715,000 | 627,100 | 627,100 | -12% |
| PROGRAM EXPENSES/SUPPLIES | 800 | 800 | 800 | 800 | 800 | 0% |
| UNIFORMS/UNIFORM ALLOW | 425 | 1,900 | 1,900 | 2,200 | 2,200 | 16% |
| BOOKS | 1,100 | 1,100 | 1,100 | 1,500 | 1,500 | 36% |
| SECURITY/SAFETY MATERIALS | - | 500 | 500 | 500 | 500 | 0% |
| COMPUTER HARDWARE | 3,075 | 1,000 | 1,000 | 5,400 | 3,700 | 270% |
| MATERIALS & SUPPLIES | 5,400 | 5,300 | 5,300 | 10,400 | 8,700 | 64% |
| TELEPHONE/FAX | 2,797 | 2,000 | 4,000 | 4,400 | 5,100 | 155% |
| SUBSCRIPTIONS AND DUES | 318 | 1,400 | 1,400 | 1,400 | 1,400 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 577 | 4,300 | 4,300 | 7,400 | 7,400 | 72% |
| CONTRACTUAL SERVICES | 29,018 | 30,000 | 30,000 | 40,000 | 110,000 | 267% |
| OFF EPUIP/REPAIRS & MAINT | 4,424 | 4,900 | 4,900 | 4,900 | 4,900 | 0% |
| GASOLINE | 2,604 | 4,500 | 4,500 | 4,500 | 4,500 | 0% |
| ADMINISTRATIVE EXPENDITURES | 39,738 | 47,100 | 49,100 | 62,600 | 133,300 | 183% |
TOTAL EXPENDITURES $ 763,116 $ 767,400 $ 769,400 $ 700,100 $ 769,100 0%
PERSONNEL BUDGETED FULL-TIME POSITIONS 6.0 6.0 6.0 6.0 6.0
269
Página 294
Code Enforcement
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 475,797 550,500 550,500 600,100 600,100 9%
MATERIALS & SUPPLIES 41,155 46,300 46,300 46,400 46,400 0%
ADMINISTRATIVE EXPENDITURES 263,413 566,700 564,700 567,200 497,200 -12%
OPERATING EXPENDITURES 780,365 1,163,500 1,161,500 1,213,700 1,143,700 -2%
CAPITAL OUTLAY 42,369 - - 135,000 135,000 100%
TOTAL EXPENDITURES $ 822,734 $ 1,163,500 $ 1,161,500 $ 1,348,700 $ 1,278,700 10%
Highlights:
Regrading of Inspectors I, II, & III for FY26.
Decrease in demolition expense due to spending trends.
270
Página 295
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
CODE ENFORCEMENT 100-11-16-20-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 324,018 | $ | 338,800 | $ | 338,800 | $ | 386,600 | $ | 386,600 | 14% |
| OVERTIME | 2,562 | 4,600 | 4,600 | 14,300 | 14,300 | 211% | |||||
| FICA TAXES | 23,652 | 26,300 | 26,300 | 30,700 | 30,700 | 17% | |||||
| HEALTH INSURANCE | 73,407 | 112,600 | 112,600 | 117,400 | 117,400 | 4% | |||||
| L I D INSURANCE | 1,600 | 1,700 | 1,700 | 3,300 | 3,300 | 94% | |||||
| WORKERS COMPENSATION | 2,233 | 2,300 | 2,300 | 2,700 | 2,700 | 17% | |||||
| EDUCATIONAL ASSISTANCE | - | - | - | 10,800 | 10,800 | 100% | |||||
| PENSION | 45,051 | 60,800 | 60,800 | 30,400 | 30,400 | -50% | |||||
| OPEB | 3,274 | 3,400 | 3,400 | 3,900 | 3,900 | 15% | |||||
| PERSONNEL COSTS | 475,797 | 550,500 | 550,500 | 600,100 | 600,100 | 9% |
| PROGRAM EXPENSES/SUPPLIES | 32,675 | 39,000 | 39,000 | 38,000 | 38,000 | -3% |
| UNIFORMS/UNIFORM ALLOW | 2,062 | 3,400 | 3,400 | 4,500 | 4,500 | 32% |
| BOOKS | 600 | 600 | 600 | 900 | 900 | 50% |
| SECURITY/SAFETY MATERIALS | 2,578 | 3,000 | 3,000 | 3,000 | 3,000 | 0% |
| COMPUTER HARDWARE | 3,240 | 300 | 300 | - | - | -100% |
| MATERIALS & SUPPLIES | 41,155 | 46,300 | 46,300 | 46,400 | 46,400 | 0% |
| TELEPHONE/FAX | 4,837 | 4,000 | 4,000 | 4,200 | 4,200 | 5% |
| SUBSCRIPTIONS AND DUES | 60 | 400 | 400 | 400 | 400 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 1,657 | 3,200 | 3,200 | 3,200 | 3,200 | 0% |
| DEMOLITION EXPENSES | 250,391 | 550,000 | 548,000 | 550,000 | 480,000 | -13% |
| GASOLINE | 3,679 | 6,500 | 6,500 | 6,500 | 6,500 | 0% |
| RADIO REPAIRS/MAINTENANCE | 2,790 | 2,600 | 2,600 | 2,900 | 2,900 | 12% |
| ADMINISTRATIVE EXPENDITURES | 263,413 | 566,700 | 564,700 | 567,200 | 497,200 | -12% |
OPERATING EXPENDITURES 780,365 1,163,500 1,161,500 1,213,700 1,143,700 -2%
| AUTOMOBILES- PURCHASE | 42,369 | - | - | 135,000 | 135,000 | 100% |
| CAPITAL OUTLAY | 42,369 | - | - | 135,000 | 135,000 | 100% |
TOTAL EXPENDITURES $ 822,734 $ 1,163,500 $ 1,161,500 $ 1,348,700 $ 1,278,700 10%
PERSONNEL BUDGETED FULL-TIME POSITIONS 6.0 6.0 6.0 6.0 6.0
271
Página 296
THIS PAGE INTENTIONALLY LEFT BLANK
272
Página 297
Dover Police Department Mayor
Organizational Chart City of Dover
Effective: March 30, 2025
Chief of Police
1 Sworn
Office Administrator Chaplain
1 Civilian 2 appointed volunteer civilians
Deputy Chief
SORT Commander 1 Sworn CNT Commander
(not an additional position) (not an additional position)
Operations Division Cmdr Office of Professional Standards Cmdr Administrative Division Cmdr 1 Sworn 1 Sworn 1 Sworn
Criminal Investigations Cmdr Special Services Internal Affairs Cmdr Administrative Unit Cmdr 1 Sworn Unit Cmdr 1 Sworn 1 Sworn 1 Sworn Criminal Investigations Public Information Officer Supervisor Planning and Training Special Services 2 Sworn 1 Sworn 1 Sworn Supervisor 1 Sworn Firearms Training Unit Building Craftsperson Detectives Section 1 Sworn 1 Civilian 6 Sworn Motorcycle Section 4 Sworn Field Training Police Resource Mgr Crime Scene Investigations 2 Officers 2 Sworn 1 Civilian Parking Enforcement Crime Analysis/ Accreditation Section Records Administrator Sex Offender Section 2 Civilians 1 Civilian 1 Civilian 2 Civilians
DVOC Supervisor Animal Control Evidence Supervisor Records Unit 1 Civilian 1 Civilian 5 Civilians (1 vacancy) 1 Sworn Evidence Technician Victim Services DVOC Section Police Cadets (part-time) 6 Civilians 1 Civilian 2 Civilians (1 full-time and 1 part-time) 4 Sworn No Duty Status (Sworn) LAN Supervisor Gang Intelligence Special Services None 1 Civilian Supervisor Community 1 Sworn LAN Analyst Policing 1 Sworn 1 Civilian Street Crimes Section Police Academy 4 Sworn Supervisor Community Policing Section 911 Supervisor 1 Sworn 1 Civilian Gang Violence Initiative Analyst 4 Sworn 1 Civilian (part-time) Police Academy Staff Communications Police Athletic League Section Patrol Unit Cmdr 1 Sworn 2 Officers 15 Civilians (1 vacancy) 1 Sworn Police Academy Full-time on Staff Behavioral Health Section 4 Recruits “A” Platoon 1 Sworn 109 Sworn 12 Sworn 38 Civilians Clinical Field Partner 147 Employees “B” Platoon 12 Sworn 1 Civilian Part-time on Staff 8 Civilians School Resource Officers “C” Platoon 5 Sworn Hiring Vacancies 13 Sworn 1 Sworn “D” Platoon Mobile Field Force (MFF) 2 Full-time Civilians Temporary Specialized Assignment 12 Sworn
273
Página 298
Police
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS $ 20,032,724 $ 21,925,600 $ 21,925,600 $ 24,004,300 $ 24,004,300 9%
MATERIALS & SUPPLIES 430,825 450,800 450,800 556,100 556,100 23%
ADMINISTRATIVE EXPENDITURES 995,889 1,089,700 1,089,700 1,099,500 1,099,500 1%
OPERATING EXPENDITURES 21,459,438 23,466,100 23,466,100 25,659,900 25,659,900 9%
CAPITAL OUTLAY 751,216 1,488,100 2,351,400 1,176,400 1,176,400 -21%
TOTAL EXPENDITURES $ 22,210,654 $ 24,954,200 $ 25,817,500 $ 26,836,300 $ 26,836,300 8%
Highlights:
Adding additional Communication Operator and Police Clerk for FY26.
Law Enforcement Officers fully staffed at 109.
Three full-time civilian vacancies (carried over from FY25).
274
Página 299
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
POLICE - ADMINISTRATION 100-11-17-00-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| FURNITURE/FIXTURES | $ | 7,200 | $ | 3,200 | $ | 3,200 | $ | 3,200 | $ | 3,200 | 0% |
| OFFICE SUPPLIES | 5,840 | 10,000 | 10,000 | 10,000 | 10,000 | 0% | |||||
| PRINTING AND DUPLICATING | 10,788 | 14,000 | 14,000 | 14,000 | 14,000 | 0% | |||||
| PHOTOGRAPHIC | - | 500 | 500 | 500 | 500 | 0% | |||||
| CUSTODIAL | 961 | 2,000 | 2,000 | 2,000 | 2,000 | 0% | |||||
| PROGRAM EXPENSES/SUPPLIES | 89,263 | 113,000 | 113,000 | 161,400 | 161,400 | 43% | |||||
| MEDICAL SUP & PHYSICALS | 39,862 | 37,000 | 37,000 | 37,000 | 37,000 | 0% | |||||
| UNIFORMS/UNIFORM ALLOW | 166,438 | 171,200 | 171,200 | 211,600 | 211,600 | 24% | |||||
| SECURITY/SAFETY MATERIALS | 1,238 | 1,200 | 1,200 | 1,200 | 1,200 | 0% | |||||
| ANIMAL CARE EXPENSES | 10,696 | 9,000 | 9,000 | 9,000 | 9,000 | 0% | |||||
| COMPUTER SOFTWARE | 12,325 | 10,000 | 10,000 | 12,000 | 12,000 | 20% | |||||
| COMPUTER HARDWARE | 29,380 | 23,200 | 23,200 | 21,700 | 21,700 | -6% | |||||
| CITY BLDG MAINT SUPPLIES | 52,560 | 51,000 | 51,000 | 67,000 | 67,000 | 31% | |||||
| WATER/SEWER | 4,275 | 5,500 | 5,500 | 5,500 | 5,500 | 0% | |||||
| MATERIALS & SUPPLIES | 430,825 | 450,800 | 450,800 | 556,100 | 556,100 | 23% |
| TELEPHONE/FAX | 73,787 | 86,200 | 86,200 | 86,200 | 86,200 | 0% |
| POSTAGE | 55 | 100 | 100 | 200 | 200 | 100% |
| ELECTRICITY | 80,714 | 94,000 | 94,000 | 94,000 | 94,000 | 0% |
| HEATING OIL/GAS | 9,609 | 13,000 | 13,000 | 13,000 | 13,000 | 0% |
| ADVERTISEMENT | 1,579 | 6,000 | 6,000 | 12,000 | 12,000 | 100% |
| INSURANCE | 10,007 | 35,400 | 35,400 | 35,400 | 35,400 | 0% |
| SUBSCRIPTIONS AND DUES | 10,806 | 11,000 | 11,000 | 11,000 | 11,000 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 179,160 | 142,100 | 142,100 | 145,800 | 145,800 | 3% |
| CONSULTING FEES/AUDIT FEES | 36,094 | 42,600 | 42,600 | 42,600 | 42,600 | 0% |
| CONTRACTUAL SERVICES | 201,087 | 197,500 | 207,500 | 197,500 | 197,500 | 0% |
| OFF EPUIP/REPAIRS & MAINT | 56,594 | 66,600 | 82,600 | 66,600 | 66,600 | 0% |
| GASOLINE | 251,090 | 300,000 | 274,000 | 300,000 | 300,000 | 0% |
| AUTO REPAIRS/MAINTENANCE | 56,404 | 60,000 | 60,000 | 60,000 | 60,000 | 0% |
| RADIO REPAIRS/MAINTENANCE | 28,902 | 35,200 | 35,200 | 35,200 | 35,200 | 0% |
| ADMINISTRATIVE EXPENDITURES | 995,889 | 1,089,700 | 1,089,700 | 1,099,500 | 1,099,500 | 1% |
OPERATING EXPENDITURES 23,352,314 23,466,100 23,466,100 25,659,900 25,659,900 9%
| AUTOMOBILES - PURCHASE | 467,974 | 831,600 | 1,694,900 | 741,400 | 741,400 | -11% |
| CONSTRUCTION - PURCHASE | 283,242 | 656,500 | 656,500 | 435,000 | 435,000 | -34% |
| CAPITAL OUTLAY | 751,216 | 1,488,100 | 2,351,400 | 1,176,400 | 1,176,400 | -21% |
TOTAL EXPENDITURES $ 24,103,530 $ 24,954,200 $ 25,817,500 $ 26,836,300 $ 26,836,300 8%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 144.0 | 145.0 | 145.0 | 147.0 | 147.0 |
| BUDGETED PART-TIME POSITIONS | 6.0 | 7.0 | 7.0 | 8.0 | 8.0 |
| BUDGETED PART-TIME POSITIONS - | |||||
|---|---|---|---|---|---|
| GRANT FUNDED | - | - | - | 1.0 | 1.0 |
275
Página 300
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
POLICE - CIVILIAN 100-11-17-24-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 1,984,589 | $ | 2,230,400 | $ | 2,230,400 | $ | 2,577,100 | $ | 2,577,100 | 16% |
| OVERTIME | 225,609 | 167,900 | 167,900 | 187,900 | 187,900 | 12% | |||||
| TEMPORARY HELP | 3,816 | 162,600 | 162,600 | 182,200 | 182,200 | 12% | |||||
| FICA TAXES | 163,365 | 195,900 | 195,900 | 225,200 | 225,200 | 15% | |||||
| HEALTH INSURANCE | 321,200 | 543,000 | 543,000 | 567,400 | 567,400 | 4% | |||||
| L I D INSURANCE | 7,623 | 9,100 | 9,100 | 30,400 | 30,400 | 234% | |||||
| WORKERS COMPENSATION | 11,760 | 8,200 | 8,200 | 14,100 | 14,100 | 72% | |||||
| EDUCATIONAL ASSISTANCE | - | 6,900 | 6,900 | - | - | -100% | |||||
| PENSION | 624,161 | 583,800 | 583,800 | 975,900 | 975,900 | 67% | |||||
| OPEB | 20,165 | 22,000 | 22,000 | 25,400 | 25,400 | 15% | |||||
| PERSONNEL COSTS | 3,362,289 | 3,929,800 | 3,929,800 | 4,785,600 | 4,785,600 | 22% |
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 36 | 36 | 36 | 38 | 38 |
| BUDGETED PART-TIME POSITIONS | 7 | 8 | 8 | 8 | 8 |
POLICE - LAW ENFORCEMENT 100-11-17-30-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | |
|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE |
| SALARIES | 10,258,278 | 11,061,600 | 11,061,600 | 11,250,700 | 11,250,700 | 2% |
| OVERTIME | 941,196 | 761,100 | 761,100 | 962,700 | 962,700 | 26% |
| FICA TAXES | 825,063 | 904,400 | 904,400 | 934,400 | 934,400 | 3% |
| HEALTH INSURANCE | 1,739,669 | 2,177,600 | 2,177,600 | 2,373,200 | 2,373,200 | 9% |
| L I D INSURANCE | 33,261 | 33,200 | 33,200 | 122,400 | 122,400 | 269% |
| WORKERS COMPENSATION | 693,514 | 729,500 | 729,500 | 739,700 | 739,700 | 1% |
| EDUCATIONAL ASSISTANCE | 58,227 | 70,000 | 70,000 | 131,300 | 131,300 | 88% |
| PENSION | 1,282,212 | 1,744,600 | 1,744,600 | 1,682,900 | 1,682,900 | -4% |
| OPEB | 92,998 | 108,800 | 108,800 | 110,700 | 110,700 | 2% |
| PERSONNEL COSTS | 15,924,417 | 17,590,800 | 17,590,800 | 18,308,000 | 18,308,000 | 4% |
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 109 | 109 | 109 | 109 | 109 |
| BUDGETED PART-TIME POSITIONS | - | - | - | - | - |
POLICE - EXTRA DUTY 100-11-17-31-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | |
|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE |
| SALARIES | 655,819 | 355,800 | 355,800 | 800,000 | 800,000 | 125% |
| FICA TAXES | 49,538 | 27,200 | 27,200 | 61,200 | 61,200 | 125% |
| WORKERS COMPENSATION | 40,661 | 22,000 | 22,000 | 49,500 | 49,500 | 125% |
| PERSONNEL COSTS | 746,018 | 405,000 | 405,000 | 910,700 | 910,700 | 125% |
TOTAL PERSONNEL COSTS $ 20,032,724 $ 21,925,600 $ 21,925,600 $ 24,004,300 $ 24,004,300 9%
TOTAL PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 145.0 | 145.0 | 145.0 | 147.0 | 147.0 |
| BUDGETED PART-TIME POSITIONS | 7.0 | 8.0 | 8.0 | 8.0 | 8.0 |
276
Página 301
7ÿ
011213453ÿ7238ÿ9454
43 +413 43 ÿ23 2ÿ1ÿ23
| !525 25 | ÿÿ94 | |||
|---|---|---|---|---|
| 9454 | 0'252134325 | 3 31 | 3 43 |
72$2ÿ!525 ÿ"#52245 0'2521342$ÿ011213453 7 ÿ4' 4ÿ9454 51%3 9!ÿ !5$25 534ÿ253213
9!ÿÿ()* 9!ÿ
25+3 3ÿ4253 ÿ 9!ÿÿ(,*
()*
&2'ÿ% $21ÿ 9!ÿÿ()*
277
Página 302
Public Works
DEPARTMENTAL VISION
The Public Works Department strives to enhance the quality of life of all residents by maintaining public works infrastructure and providing safe, reliable, effective services consistent with our mission for our City.
MAJOR PROGRAMS
CAPITAL IMPROVEMENT PROJECTS
Objective: The objective of this program is to provide upgrades and improvements to DPW's annual vehicle & equipment replacements, community sign refurbishments, MS4 inventory/inspections, miscellaneous emergency repairs to stormwater infrastructure.
SOLID WASTE COLLECTION & RECYCLING
Objective: The primary objective of this program is to provide regular collection, transportation and disposal of municipal solid waste, recycling, hand trash, bulk household waste, yard waste and bulk yard waste for over 11,000 accounts. This consists of approximately 13,200 tons of municipal solid waste and approximately 1,000 tons of yard waste per year. Objective: A secondary objective of this program is to provide timely delivery and maintenance of the City’s automated containers to all customers so that solid waste and recycling can be collected efficiently.
STREET & STORMWATER MANAGEMENT
Objective: A primary objective of this program is to manage the City’s Municipal Separate Storm Sewer System (MS4) in such a way as to ensure that the standards and requirements of the City’s National Pollutant Discharge Elimination System (NPDES) permit are met. Key elements of the NPDES permit include public outreach and education, an illicit discharge detection and elimination program / inventory, ensuring stormwater management during construction, providing post construction stormwater management controls, and implementing pollution prevention and good housekeeping measures. Objective: A primary objective of this program is to perform preventative maintenance and repair on 139 miles of storm sewer and approximately 6,900 catch basins. In addition, this program involves the preventative maintenance and repair of tax ditches, City owned stormwater ponds and various areas adjacent to Silver Lake, to improve the water quality of all water bodies. Objective: A primary objective of this program is to perform preventative maintenance and repair to 115 miles of street right-of-way which includes pavement, sidewalk and curbs, in order to provide safe methods of transportation. Objective: A primary objective of this program is to perform annual street sweeping and seasonal leaf collection to the City’s 115 miles of streets, which decrease debris from entering the water bodies.
278
Página 303
PUBLIC WORKS ADMINISTRATION
Objective: The primary objective is to support DPW through the providing of customer service on behalf of all Divisions, processing work order requests, issuing press releases, processing payroll, overseeing the preparation and implementation of the Departmental budget and overseeing Departmental staffing and recruitment. These efforts are made so that our employees and customers have appropriate information to handle concerns.
GEOGRAPHIC INFORMATION SYSTEMS (GIS)
Objective: The primary objective is to provide citywide services including the administration and maintenance of our Enterprise GIS System which assists in the management of the City’s various assets, data, and services. These efforts enable supervisors, managers, and citizens the ability to make more informed, logical decisions impacting the City of Dover.
279
Página 304
Public Works Admin
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 598,611 635,300 635,300 696,700 696,700 10%
MATERIALS & SUPPLIES 10,238 29,200 29,200 24,000 24,000 -18%
ADMINISTRATIVE EXPENDITURES 7,863 6,200 6,200 22,800 7,200 16%
OPERATING EXPENDITURES 616,713 670,700 670,700 743,500 727,900 9%
TOTAL EXPENDITURES $ 644,373 $ 670,700 $ 670,700 $ 743,500 $ 727,900 9%
Highlights: One Administrative Assistant was moved from the General Fund to Wastewater – no change in location or duties, funding of position will be more in line with current duties.
280
Página 305
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
PUBLIC WORKS - ADMINISTRATION 100-12-18-10-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 328,034 | $ | 343,700 | $ | 343,700 | $ | 314,800 | $ | 314,800 | -8% |
| OVERTIME | - | 800 | 800 | 400 | 400 | -50% | |||||
| TEMPORARY HELP | - | - | - | - | - | 0% | |||||
| FICA TAXES | 23,394 | 26,300 | 26,300 | 24,100 | 24,100 | -8% | |||||
| HEALTH INSURANCE | 84,519 | 109,900 | 109,900 | 101,200 | 101,200 | -8% | |||||
| L I D INSURANCE | 1,638 | 2,000 | 2,000 | 3,100 | 3,100 | 55% | |||||
| WORKERS COMPENSATION | 1,063 | 1,100 | 1,100 | 1,000 | 1,000 | -9% | |||||
| EDUCATIONAL ASSISTANCE | 2,234 | 4,800 | 4,800 | 4,800 | 4,800 | 0% | |||||
| PENSION | 154,448 | 143,300 | 143,300 | 244,200 | 244,200 | 70% | |||||
| OPEB | 3,280 | 3,400 | 3,400 | 3,100 | 3,100 | -9% | |||||
| PERSONNEL COSTS | 598,611 | 635,300 | 635,300 | 696,700 | 696,700 | 10% |
| FURNITURE/FIXTURES | 168 | 7,000 | 7,000 | 10,000 | 10,000 | 43% |
| OFFICE SUPPLIES | 2,296 | 2,800 | 2,800 | 2,800 | 2,800 | 0% |
| PRINTING AND DUPLICATING | 5,212 | 8,000 | 8,000 | 8,000 | 8,000 | 0% |
| UNIFORM/UNIFORM ALLOW | - | 300 | 300 | 300 | 300 | 0% |
| SECURITY/SAFETY MATERIALS | - | 200 | 200 | 200 | 200 | 0% |
| COMPUTER SOFTWARE | - | 8,700 | 8,700 | - | - | -100% |
| COMPUTER HARDWARE | 2,562 | 2,200 | 2,200 | 2,700 | 2,700 | 23% |
| MATERIALS & SUPPLIES | 10,238 | 29,200 | 29,200 | 24,000 | 24,000 | -18% |
| TELEPHONE/FAX | 3,714 | 2,200 | 2,200 | 3,800 | 3,800 | 73% |
| SUBSCRIPTIONS AND DUES | 881 | 1,000 | 1,000 | 600 | 600 | -40% |
| TRAINING/CONF/FOOD/TRAVEL | 2,599 | 2,300 | 2,300 | 1,600 | 1,600 | -30% |
| CONTRACTUAL SERVICES | - | - | - | 15,600 | 15,600 | 100% |
| GASOLINE | 214 | 200 | 200 | 600 | 600 | 200% |
| RADIO REPAIRS/MAINTENANCE | 455 | 500 | 500 | 600 | 600 | 20% |
| ADMINISTRATIVE EXPENDITURES | 7,863 | 6,200 | 6,200 | 22,800 | 22,800 | 268% |
OPERATING EXPENDITURES 616,713 670,700 670,700 743,500 743,500 11%
TOTAL EXPENDITURES $ 644,373 $ 670,700 $ 670,700 $ 743,500 $ 743,500 11%
PERSONNEL BUDGETED FULL-TIME POSITIONS 5.0 5.0 5.0 5.0 4.0
281
Página 306
General Fund - Engineering
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 209,666 216,700 216,700 225,100 225,100 4%
MATERIALS & SUPPLIES 11,950 14,300 16,400 15,400 15,400 8%
ADMINISTRATIVE EXPENDITURES 30,335 61,900 59,800 63,000 63,000 2%
OPERATING EXPENDITURES 251,951 292,900 292,900 303,500 303,500 4%
TOTAL EXPENDITURES $ 293,273 $ 292,900 $ 292,900 $ 303,500 $ 303,500 4%
Highlights:
No significant changes to divisional budget.
282
Página 307
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
GENERAL FUND ENGINEERING 100-12-26-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 145,446 | $ | 145,800 | $ | 145,800 | $ | 149,700 | $ | 149,700 | 3% |
| OVERTIME | 2,201 | 1,800 | 1,800 | 2,500 | 2,500 | 39% | |||||
| FICA TAXES | 10,676 | 11,300 | 11,300 | 11,700 | 11,700 | 4% | |||||
| HEALTH INSURANCE | 39,397 | 46,600 | 46,600 | 48,500 | 48,500 | 4% | |||||
| L I D INSURANCE | 608 | 600 | 600 | 1,200 | 1,200 | 100% | |||||
| WORKERS COMPENSATION | 1,003 | 500 | 500 | 1,000 | 1,000 | 100% | |||||
| PENSION | 8,846 | 8,600 | 8,600 | 9,000 | 9,000 | 5% | |||||
| OPEB | 1,490 | 1,500 | 1,500 | 1,500 | 1,500 | 0% | |||||
| PERSONNEL COSTS | 209,666 | 216,700 | 216,700 | 225,100 | 225,100 | 4% |
| UNIFORMS/UNIFORM ALLOW | 325 | 700 | 700 | 1,100 | 1,100 | 57% |
| SECURITY/SAFETY MATERIALS | - | 100 | 100 | 100 | 100 | 0% |
| SMALL TOOLS | 1,700 | 2,900 | 2,900 | 1,800 | 1,800 | -38% |
| COMPUTER SOFTWARE | 9,925 | 8,700 | 10,800 | 11,000 | 11,000 | 26% |
| COMPUTER HARDWARE | - | 1,900 | 1,900 | 1,400 | 1,400 | -26% |
| MATERIALS & SUPPLIES | 11,950 | 14,300 | 16,400 | 15,400 | 15,400 | 8% |
| TELEPHONE/FAX | 1,638 | 1,500 | 1,500 | 1,900 | 1,900 | 27% |
| TRAINING/CONF/FOOD/TRAVEL | 85 | 400 | 400 | 400 | 400 | 0% |
| CONTRACTUAL SERVICES | 27,615 | 59,000 | 56,900 | 59,000 | 59,000 | 0% |
| GASOLINE | 997 | 800 | 800 | 1,500 | 1,500 | 88% |
| RADIO REPAIRS/MAINTENANCE | - | 200 | 200 | 200 | 200 | 0% |
| ADMINISTRATIVE EXPENDITURES | 30,335 | 61,900 | 59,800 | 63,000 | 63,000 | 2% |
OPERATING EXPENDITURES 251,951 292,900 292,900 303,500 303,500 4%
TOTAL EXPENDITURES $ 293,273 $ 292,900 $ 292,900 $ 303,500 $ 303,500 4%
PERSONNEL BUDGETED FULL-TIME POSITIONS 2.0 2.0 2.0 2.0 2.0
283
Página 308
Streets
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 558,907 573,100 573,100 674,000 674,000 18%
MATERIALS & SUPPLIES 102,158 179,000 179,000 181,300 181,300 1%
ADMINISTRATIVE EXPENDITURES 52,478 44,900 44,900 44,500 44,500 -1%
OPERATING EXPENDITURES 713,543 797,000 797,000 899,800 899,800 13%
CAPITAL OUTLAY 801,746 415,800 2,973,100 3,130,000 2,870,000 590%
TOTAL EXPENDITURES $ 1,515,289 $ 1,212,800 $ 3,770,100 $ 4,029,800 $ 3,769,800 211%
Highlights:
Reinstitution of Street Program.
One vacancy to be filled in FY26.
284
Página 309
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
STREETS 100-12-18-35-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 362,254 | $ | 359,400 | $ | 359,400 | $ | 389,000 | $ | 389,000 | 8% |
| OVERTIME | 7,805 | 16,000 | 16,000 | 13,200 | 13,200 | -18% | |||||
| FICA TAXES | 27,679 | 28,700 | 28,700 | 30,800 | 30,800 | 7% | |||||
| HEALTH INSURANCE | 57,004 | 70,500 | 70,500 | 92,800 | 92,800 | 32% | |||||
| L I D INSURANCE | 1,810 | 1,900 | 1,900 | 3,400 | 3,400 | 79% | |||||
| WORKERS COMPENSATION | 20,681 | 20,800 | 20,800 | 22,300 | 22,300 | 7% | |||||
| PENSION | 77,970 | 72,200 | 72,200 | 118,600 | 118,600 | 64% | |||||
| OPEB | 3,704 | 3,600 | 3,600 | 3,900 | 3,900 | 8% | |||||
| PERSONNEL COSTS | 558,907 | 573,100 | 573,100 | 674,000 | 674,000 | 18% |
| PROGRAM EXPENSES/SUPPLIES | 6,000 | 8,000 | 8,000 | 8,000 | 8,000 | 0% |
| UNIFORMS/UNIFORM ALLOW | 2,515 | 3,400 | 3,400 | 4,800 | 4,800 | 41% |
| SECURITY/SAFETY MATERIALS | 3,070 | 3,400 | 3,400 | 3,400 | 3,400 | 0% |
| SMALL TOOLS | 2,687 | 3,100 | 3,100 | 4,000 | 4,000 | 29% |
| STREET REPAIRING MATERIAL | 28,932 | 31,000 | 31,000 | 31,000 | 31,000 | 0% |
| STREET SIGNS/MARKING | 23,326 | 28,000 | 28,000 | 28,000 | 28,000 | 0% |
| SAND AND SALT | - | 1,900 | 1,900 | 1,900 | 1,900 | 0% |
| CITY BLDG MAINT SUPPLIES | 602 | 200 | 200 | 200 | 200 | 0% |
| STORM CONTINGENCY | - | 100,000 | 100,000 | 100,000 | 100,000 | 0% |
| MATERIALS & SUPPLIES | 102,158 | 179,000 | 179,000 | 181,300 | 181,300 | 1% |
| TELEPHONE/FAX | 889 | 900 | 900 | 900 | 900 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 150 | 2,000 | 2,000 | 300 | 300 | -85% |
| CONSULTING FEES | 1,000 | 1,000 | 1,000 | 1,000 | 0% | |
| CONTRACTUAL SERVICES | 25,625 | 11,300 | 11,300 | 12,000 | 12,000 | 6% |
| GASOLINE | 20,417 | 20,000 | 20,000 | 20,000 | 20,000 | 0% |
| MAINT EPUIP REPAIRS/MAINT | 2,212 | 6,700 | 6,700 | 6,700 | 6,700 | 0% |
| RADIO REPAIRS/MAINTENANCE | 3,185 | 3,000 | 3,000 | 3,600 | 3,600 | 20% |
| ADMINISTRATIVE EXPENDITURES | 52,478 | 44,900 | 44,900 | 44,500 | 44,500 | -1% |
OPERATING EXPENDITURES 713,543 797,000 797,000 899,800 899,800 13%
| TRUCKS - PURCHASE | 48,435 | 215,000 | 730,900 | 110,000 | 110,000 | -49% |
| OTHER EPUIPMENT PURCHASE | 67,754 | 180,800 | 180,800 | 240,000 | 240,000 | 33% |
| CONSTRUCTION - PURCHASE | 685,557 | 20,000 | 2,061,400 | 2,780,000 | 2,520,000 | 12500% |
| CAPITAL OUTLAY | 801,746 | 415,800 | 2,973,100 | 3,130,000 | 2,870,000 | 590% |
TOTAL EXPENDITURES $ 1,515,289 $ 1,212,800 $ 3,770,100 $ 4,029,800 $ 3,769,800 211%
PERSONNEL BUDGETED FULL-TIME POSITIONS 7.0 7.0 7.0 7.0 7.0
285
Página 310
Stormwater
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 367,552 616,900 616,900 646,200 646,200 5%
MATERIALS & SUPPLIES 60,588 90,600 90,600 79,000 79,000 -13%
ADMINISTRATIVE EXPENDITURES 280,019 313,700 313,700 384,700 379,700 21%
OPERATING EXPENDITURES 708,159 1,021,200 1,021,200 1,109,900 1,104,900 8%
CAPITAL OUTLAY 925,452 2,249,000 4,366,100 3,310,000 3,124,000 47%
TOTAL EXPENDITURES $ 1,633,611 $ 3,270,200 $ 5,387,300 $ 4,419,900 $ 4,414,900 35%
Highlights:
Stormwater Utility model to be re-evaluated in FY26.
286
Página 311
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
STORMWATER 100-12-18-60-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 255,495 | $ | 391,800 | $ | 391,800 | $ | 424,200 | $ | 424,200 | 8% |
| OVERTIME | 4,847 | 11,400 | 11,400 | 10,200 | 10,200 | -11% | |||||
| FICA TAXES | 19,078 | 30,800 | 30,800 | 33,200 | 33,200 | 8% | |||||
| HEALTH INSURANCE | 52,266 | 131,000 | 131,000 | 120,300 | 120,300 | -8% | |||||
| L I D INSURANCE | 1,214 | 2,200 | 2,200 | 4,100 | 4,100 | 86% | |||||
| WORKERS COMPENSATION | 11,537 | 16,600 | 16,600 | 18,100 | 18,100 | 9% | |||||
| PENSION | 20,510 | 29,200 | 29,200 | 31,900 | 31,900 | 9% | |||||
| OPEB | 2,605 | 3,900 | 3,900 | 4,200 | 4,200 | 8% | |||||
| PERSONNEL COSTS | 367,552 | 616,900 | 616,900 | 646,200 | 646,200 | 5% |
| PROGRAM EXPENSES/SUPPLIES | 24,600 | 56,500 | 56,500 | 38,500 | 38,500 | -32% |
| UNIFORMS/UNIFORM ALLOW | 1,911 | 3,400 | 3,400 | 5,000 | 5,000 | 47% |
| SECURITY/SAFETY MATERIALS | 783 | 1,000 | 1,000 | 1,000 | 1,000 | 0% |
| SMALL TOOLS | 5,769 | 2,500 | 2,500 | 3,500 | 3,500 | 40% |
| STREET CLEANING SUPPLIES | 4,994 | 6,000 | 6,000 | 6,000 | 6,000 | 0% |
| STORM SEWER SUPPLIES | 20,000 | 21,200 | 21,200 | 25,000 | 25,000 | 18% |
| MATERIALS & SUPPLIES | 60,588 | 90,600 | 90,600 | 79,000 | 79,000 | -13% |
| TELEPHONE/FAX | 890 | 900 | 900 | 900 | 900 | 0% |
| ADVERTISEMENT | 1,099 | 1,100 | 1,100 | 2,100 | 2,100 | 91% |
| TRAINING/CONF/FOOD/TRAVEL | 265 | 3,000 | 3,000 | 2,100 | 2,100 | -30% |
| CONSULTING FEES | 5,300 | 10,000 | 10,000 | 39,400 | 39,400 | 294% |
| CONTRACTUAL SERVICES | 208,370 | 218,700 | 218,700 | 254,700 | 254,700 | 16% |
| ENVIRONMENTAL EXPENSES | 1,926 | 2,000 | 2,000 | 2,000 | 2,000 | 0% |
| AGENCY BILLING-TEMP HELP | 21,699 | 30,000 | 30,000 | 30,000 | 30,000 | 0% |
| GASOLINE | 32,570 | 40,000 | 40,000 | 40,000 | 35,000 | -13% |
| MAINT EPUIP REPAIRS/MAINT | 5,171 | 5,400 | 5,400 | 10,000 | 10,000 | 85% |
| RADIO REPAIRS/MAINTENANCE | 2,730 | 2,600 | 2,600 | 3,500 | 3,500 | 35% |
| ADMINISTRATIVE EXPENDITURES | 280,019 | 313,700 | 313,700 | 384,700 | 379,700 | 21% |
OPERATING EXPENDITURES 708,159 1,021,200 1,021,200 1,109,900 1,104,900 8%
| CONSTRUCTION - PURCHASE | 925,452 | 2,249,000 | 4,366,100 | 3,310,000 | 3,124,000 | 39% |
| CAPITAL OUTLAY | 925,452 | 2,249,000 | 4,366,100 | 3,310,000 | 3,124,000 | 39% |
TOTAL EXPENDITURES $ 1,633,611 $ 3,270,200 $ 5,387,300 $ 4,419,900 $ 4,228,900 29%
PERSONNEL BUDGETED FULL-TIME POSITIONS 8.0 8.0 8.0 8.0 8.0
287
Página 312
THIS PAGE INTENTIONALLY LEFT BLANK
288
Página 313
SANITATION
Página 314
THIS PAGE INTENTIONALLY LEFT BLANK
Página 315
6$1,7$7,21
FUNDBUDGET
REVIEW
Fiscal Year 2025-2026
289
Página 316
THIS PAGE INTENTIONALLY LEFT BLANK
290
Página 317
00
011213453ÿ7238ÿ9454
!"2#ÿ$%1ÿ&2#3
2ÿ 21ÿ
7 ÿ4 9ÿÿ
9ÿÿ 9ÿÿ
291
Página 318
Sanitation
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 959,434 1,094,000 1,094,000 1,291,200 1,291,200 18%
MATERIALS & SUPPLIES 46,549 53,600 53,600 53,800 53,800 0%
ADMINISTRATIVE EXPENDITURES 1,636,000 1,993,000 1,993,000 1,943,500 1,923,500 -3%
OPERATING EXPENSES 2,641,982 3,140,600 3,140,600 3,288,500 3,268,500 4%
CAPITAL OUTLAY 982,109 739,000 1,191,000 735,000 735,000 -1%
TOTAL EXPENDITURES $ 3,624,091 $ 3,879,600 $ 4,331,600 $ 4,023,500 $ 4,003,500 3%
Highlights:
One vacancy to be filled in FY26.
292
Página 319
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
SANITATION 100-12-18-50-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 534,732 | $ | 597,200 | $ | 597,200 | $ | 638,900 | $ | 638,900 | 7% |
| OVERTIME | 11,270 | 21,000 | 21,000 | 17,000 | 17,000 | -19% | |||||
| FICA TAXES | 39,157 | 47,300 | 47,300 | 50,200 | 50,200 | 6% | |||||
| HEALTH INSURANCE | 131,519 | 190,300 | 190,300 | 205,500 | 205,500 | 8% | |||||
| L I D INSURANCE | 2,696 | 3,100 | 3,100 | 5,600 | 5,600 | 81% | |||||
| WORKERS COMPENSATION | 30,259 | 34,200 | 34,200 | 36,200 | 36,200 | 6% | |||||
| PENSION | 204,340 | 194,900 | 194,900 | 331,400 | 331,400 | 70% | |||||
| OPEB | 5,462 | 6,000 | 6,000 | 6,400 | 6,400 | 7% | |||||
| PERSONNEL COSTS | 959,434 | 1,094,000 | 1,094,000 | 1,291,200 | 1,291,200 | 18% |
| PROGRAM EXPENSES/SUPPLIES | 40,907 | 44,000 | 44,000 | 44,000 | 44,000 | 0% |
| UNIFORMS/UNIFORM ALLOW | 3,473 | 5,500 | 5,500 | 7,100 | 7,100 | 29% |
| SECURITY/SAFETY MATERIALS | 1,619 | 1,700 | 1,700 | 1,700 | 1,700 | 0% |
| SMALL TOOLS | 412 | 500 | 500 | 500 | 500 | 0% |
| CITY BLDG MAINT SUPPLIES | 137 | 500 | 500 | 500 | 500 | 0% |
| MATERIALS & SUPPLIES | 46,549 | 53,600 | 53,600 | 53,800 | 53,800 | 0% |
| TELEPHONE/FAX | 553 | 500 | 500 | 600 | 600 | 20% |
| ADVERTISEMENT | 6,376 | 6,400 | 6,400 | 6,800 | 6,800 | 6% |
| TRAINING/CONF/FOOD/TRAVEL | 100 | 3,500 | 3,500 | 800 | 800 | -77% |
| CONTRACTUAL SERVICES | 1,473,964 | 1,782,700 | 1,782,700 | 1,734,600 | 1,734,600 | -3% |
| ENVIRONMENTAL EXPENSES | 114 | 2,000 | 2,000 | 2,000 | 2,000 | 0% |
| AGENCY BILLING-TEMP HELP | 51,033 | 58,500 | 58,500 | 58,500 | 58,500 | 0% |
| GASOLINE | 100,219 | 134,000 | 134,000 | 134,000 | 114,000 | -15% |
| MAINT EQUIP REPAIRS/MAINT | - | 2,000 | 2,000 | 2,000 | 2,000 | 0% |
| RADIO REPAIRS/MAINTENANCE | 3,640 | 3,400 | 3,400 | 4,200 | 4,200 | 24% |
| ADMINISTRATIVE EXPENDITURES | 1,636,000 | 1,993,000 | 1,993,000 | 1,943,500 | 1,923,500 | -3% |
OPERATING EXPENSES 2,641,982 3,140,600 3,140,600 3,288,500 3,268,500 4%
| TRUCKS - PURCHASE | 982,109 | 739,000 | 1,191,000 | 735,000 | 735,000 | -1% |
| CAPITAL OUTLAY | 982,109 | 739,000 | 1,191,000 | 735,000 | 735,000 | -1% |
TOTAL EXPENDITURES $ 3,624,091 $ 3,879,600 $ 4,331,600 $ 4,023,500 $ 4,003,500 3%
PERSONNEL BUDGETED FULL-TIME POSITIONS 11.0 11.0 11.0 11.0 11.0
293
Página 320
THIS PAGE INTENTIONALLY LEFT BLANK
294
Página 321
PUBLIC UTILITIES WATER THE FOLLOWING SUBSECTIONS ARE INCLUDED:
WATER ENGINEERING & INSPECTIONS WATER MAINTENANCE WATER TREATMENT PLANT
Página 322
THIS PAGE INTENTIONALLY LEFT BLANK
Página 323
WATER FUND BUDGET REVIEW
Fiscal Year 2025-2026
295
Página 324
THIS PAGE INTENTIONALLY LEFT BLANK
296
Página 325
0
011213453ÿ7238ÿ9454
43 ÿÿ41343 ÿ23
0113*ÿ 43 ÿÿ 41343 ÿ2 3
525 25 43 ÿ94253545 43 ÿ 43 53ÿÿ325
43 ÿ722ÿ525 43 41343 ÿ 43 ÿ325ÿ
94253545ÿ 21 21
7513325ÿ 32238ÿ7513325ÿ ÿ" 43ÿ###ÿ$'&
9454 7 ÿ 4
!"ÿ# ÿ" 43ÿ##ÿ$(&
9"ÿ##ÿ$%& 32238ÿ94253545ÿ
9 )452ÿ##
43 ÿ 2ÿ 15 9"ÿ# ÿ" 43ÿ#ÿ$%&
297
Página 326
Department of Water & Wastewater
DEPARTMENTAL VISION
To provide services that are an integral part of our community and citizens’ everyday lives including Water and Wastewater Management, Water Treatment & Production and Engineering & Inspections services. The Department of Water & Wastewater (DWW) shall provide quality and effective services upon which the health, safety, and comfort of this community greatly depend.
DEPARTMENTAL MISSION STATEMENT
To enhance the quality of life in our community by providing safe, reliable, high-quality water and wastewater services with comprehensive engineering and inspections through skilled, team-oriented and diverse employees.
MAJOR PROGRAMS
CAPITAL IMPROVEMENT PROJECTS
Objective: The objective of this program is to provide upgrades and improvements to DWW Water, Wastewater, Street and Stormwater Fund assets including annual vehicle & equipment replacements, street, concrete and alley repair, stormwater improvement projects, inflow and infiltration removal projects, pump station replacements and upgrades, and miscellaneous emergency repairs of wastewater infrastructure, water quality improvements, wellhead redevelopment, and miscellaneous emergency repairs of water infrastructure as well as planned upgrades and additions to critical infrastructure such as the treatment plant, wells and tanks.
WATER MANAGEMENT
Objective: A primary objective of this program is to perform preventative maintenance and repair on approximately 233 miles of water main, 12,000 services within the right-of-way and 9,500 valves. This includes biannual flushing of the water system to improve the water quality for our customers. Objective: A primary objective of this program is to provide preventative maintenance and repair to approximately 1,800 fire hydrants to ensure availability and proper functioning in times of need. Objective: A primary objective of this program is to install, repair, replace and inspect over 12,000 water meters to ensure effective monitoring of the water system. Ensuring properly functioning meters allows the City to also become aware of significant water loss within the water system and conduct an investigation as required.
WATER TREATMENT & PRODUCTION
Objective: A primary objective of this program is to operate and maintain 21 production wells (producing over 1.9 billion gallons of water per year), 16 treatment facilities, and 7 elevated storage tanks (with a total capacity of 5.25 million gallons) in order to provide drinking water to the City of Dover. Performing regular maintenance on these assets improves system reliability resulting in a dependable product source to our customers. Objective: A primary objective of this program is to perform sampling of the drinking water at various locations throughout the City. An average of over 1,800 routing analyses are performed on our drinking water every month to ensure regulatory compliance and operational efficiency.
WASTEWATER MANAGEMENT
Objective: A primary objective of this program is to perform preventative maintenance and repair on approximately 160 miles of gravity sanitary sewer main, 12,000 sanitary sewer laterals within the right-of-way, 30 miles of force main and 3,700 manholes. This includes regular jetting of the gravity sanitary sewer mains and video inspection and evaluations as needed. This preventative maintenance work aids in decreasing the probability of blockages within the wastewater system.
298
Página 327
Objective: A primary objective of this program is to provide preventative maintenance and repair to 45 pumping stations to ensure proper functioning and transmission of flow to the Kent County Wastewater System as well as decreasing the probability of station failure and impacts to the environment.
ENGINEERING & INSPECTIONS
Objective: A primary objective is to provide capital improvement project design services as well as consultant oversight to ensure the most cost-effective projects are being constructed and implemented. Objective: A primary objective is to provide engineering analyses, Renovation Permit review, City Right-of-Way Permit review, engineering site plan / subdivision plan review, State Utility Permit completion and operation Division assistance with improvement development, which will increase operational efficiency to both the workforce and customers.
299
Página 328
Water - Engineering
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 % DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 254,428 347,100 347,100 350,400 350,400 1%
MATERIALS & SUPPLIES 23,898 25,300 25,300 41,600 41,600 64%
ADMINISTRATIVE EXPENDITURES 19,820 53,300 53,300 24,600 24,600 -54%
TOTAL EXPENDITURES $ 339,468 $ 452,600 $ 452,600 $ 416,600 $ 416,600 -8%
Highlights: Administrative Expenditure decrease due to completion of FY25 Rate Study.
Material & Supplies Expenditure increase due to ESRI services.
300
Página 329
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WATER ENGINEERING 400-40-26-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | |||||
|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | ||||
| SALARIES | $ | 153,951 $ | 235,000 | $ | 235,000 | $ | 239,300 | $ | 239,300 | 2% |
| FICA TAXES | 9,277 | 15,300 | 15,300 | 15,500 | 15,500 | 1% | ||||
| HEALTH INSURANCE | 17,288 | 32,300 | 32,300 | 33,600 | 33,600 | 4% | ||||
| L I D INSURANCE | 764 | 900 | 900 | 1,800 | 1,800 | 100% | ||||
| WORKERS COMPENSATION | 7,037 | 1,000 | 1,000 | 9,300 | 9,300 | 830% | ||||
| EDUCATIONAL ASSISTANCE | - | - | - | 9,900 | 9,900 | 100% | ||||
| PENSION | 64,569 | 60,600 | 60,600 | 39,000 | 39,000 | -36% | ||||
| OPEB | 1541.6 | 2,000 | 2,000 | 2,000 | 2,000 | 0% | ||||
| PERSONNEL COSTS | 254,428 | 347,100 | 347,100 | 350,400 | 350,400 | 1% |
| OFFICE SUPPLIES | 1,767 | 4,500 | 4,500 | 5,500 | 5,500 | 22% |
| UNIFORMS/UNIFORM ALLOW | 444 | 700 | 700 | 600 | 600 | -14% |
| BOOKS | - | 300 | 300 | 300 | 300 | 0% |
| SECURITY/SAFETY MATERIALS | 94 | 100 | 100 | 100 | 100 | 0% |
| SMALL TOOLS | 189 | 200 | 200 | 200 | 200 | 0% |
| COMPUTER SOFTWARE | 20,054 | 19,500 | 19,500 | 33,500 | 33,500 | 72% |
| COMPUTER HARDWARE | 1,350 | - | - | 1,400 | 1,400 | 100% |
| MATERIALS & SUPPLIES | 23,898 | 25,300 | 25,300 | 41,600 | 41,600 | 64% |
| TELEPHONE/FAX | 2,805 | 2,600 | 2,600 | 1,900 | 1,900 | -27% |
| SUBSCRIPTIONS AND DUES | 649 | 900 | 900 | 900 | 900 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 225 | 800 | 800 | 1,600 | 1,600 | 100% |
| CONTRACTUAL SERVICES | 13,886 | 46,800 | 46,800 | 18,000 | 18,000 | -62% |
| GASOLINE | 2,255 | 2,000 | 2,000 | 2,000 | 2,000 | 0% |
| RADIO REPAIRS/MAINTENANCE | - | 200 | 200 | 200 | 200 | 0% |
| ADMINISTRATIVE EXPENDITURES | 19,820 | 53,300 | 53,300 | 24,600 | 24,600 | -54% |
TOTAL EXPENDITURES $ 339,468 $ 452,600 $ 452,600 $ 416,600 $ 416,600 -8%
PERSONNEL BUDGETED FULL-TIME POSITIONS 2.5 2.5 2.5 2.5 2.5
301
Página 330
Water Management
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 628,163 739,200 739,200 818,100 818,100 11%
MATERIALS & SUPPLIES 95,999 102,200 102,200 104,100 104,100 2%
ADMINISTRATIVE EXPENDITURES 41,113 39,900 39,900 45,000 45,000 13%
OPERATING EXPENDITURES 765,276 881,300 881,300 967,200 967,200 10%
CAPITAL OUTLAY 2,059,817 3,456,700 7,886,700 3,037,600 3,037,600 -12%
TOTAL EXPENDITURES $ 2,825,092 $ 4,338,000 $ 8,768,000 $ 4,004,800 $ 4,004,800 -8%
Highlights:
New Water Service person included for FY26.
302
Página 331
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WATER MAINTENANCE 400-40-68-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 381,681 | $ | 413,900 | $ | 413,900 | $ | 497,800 | $ | 497,800 | 20% |
| OVERTIME | 15,140 | 19,000 | 19,000 | 16,700 | 16,700 | -12% | |||||
| FICA TAXES | 29,610 | 33,100 | 33,100 | 39,300 | 39,300 | 19% | |||||
| HEALTH INSURANCE | 68,736 | 97,800 | 97,800 | 122,700 | 122,700 | 25% | |||||
| L I D INSURANCE | 1,743 | 2,000 | 2,000 | 4,100 | 4,100 | 105% | |||||
| WORKERS COMPENSATION | 20,589 | 24,000 | 24,000 | 28,500 | 28,500 | 19% | |||||
| PENSION | 108,761 | 145,300 | 145,300 | 104,200 | 104,200 | -28% | |||||
| OPEB | 1,903 | 4,100 | 4,100 | 4,800 | 4,800 | 17% | |||||
| PERSONNEL COSTS | 628,163 | 739,200 | 739,200 | 818,100 | 818,100 | 11% |
| MEDICAL SUP & PHYSICALS | - | 600 | 600 | 600 | 600 | 0% |
| UNIFORMS/UNIFORM ALLOW | 1,825 | 3,100 | 3,100 | 4,000 | 4,000 | 29% |
| SECURITY/SAFETY MATERIALS | 4,086 | 1,000 | 1,000 | 1,000 | 1,000 | 0% |
| SMALL TOOLS | 3,105 | 5,500 | 5,500 | 5,500 | 5,500 | 0% |
| COMPUTER HARDWARE | 1,380 | - | - | - | - | 0% |
| WATER/SEWER SYSTEM SUP | 43,717 | 62,000 | 62,000 | 55,000 | 55,000 | -11% |
| METERS/METER SUPPLIES | 41,886 | 30,000 | 30,000 | 38,000 | 38,000 | 27% |
| MATERIALS & SUPPLIES | 95,999 | 102,200 | 102,200 | 104,100 | 104,100 | 2% |
| TELEPHONE/FAX | 4,574 | 3,600 | 3,600 | 5,900 | 5,900 | 64% |
| ADVERTISEMENT | 4,847 | 4,800 | 4,800 | 5,700 | 5,700 | 19% |
| SUBSCRIPTIONS AND DUES | 3,567 | 4,900 | 4,900 | 3,800 | 3,800 | -22% |
| TRAINING/CONF/FOOD/TRAVEL | 710 | 2,900 | 2,900 | 1,400 | 1,400 | -52% |
| CONSULTING FEES | 625 | 1,000 | 1,000 | 1,000 | 1,000 | 0% |
| CONTRACTUAL SERVICES | 9,691 | 6,400 | 6,400 | 9,400 | 9,400 | 47% |
| GASOLINE | 13,004 | 12,000 | 12,000 | 13,000 | 13,000 | 8% |
| MAINT EQUIP REPAIRS/MAINT | - | 500 | 500 | 500 | 500 | 0% |
| RADIO REPAIRS/MAINTENANCE | 4,095 | 3,800 | 3,800 | 4,300 | 4,300 | 13% |
| ADMINISTRATIVE EXPENDITURES | 41,113 | 39,900 | 39,900 | 45,000 | 45,000 | 13% |
OPERATING EXPENDITURES 765,276 881,300 881,300 967,200 967,200 10%
| TRUCKS - PURCHASE | 41,322 | - | - | - | - | 0% |
| OTHER EQUIP - PURCHASE | 9,500 | 70,000 | 100,000 | 18,400 | 18,400 | -74% |
| CONSTRUCTION - PURCHASE | 2,008,995 | 3,386,700 | 7,786,700 | 3,019,200 | 3,019,200 | -11% |
| CAPITAL OUTLAY | 2,059,817 | 3,456,700 | 7,886,700 | 3,037,600 | 3,037,600 | -12% |
TOTAL EXPENDITURES $ 2,825,092 $ 4,338,000 $ 8,768,000 $ 4,004,800 $ 4,004,800 -8%
PERSONNEL BUDGETED FULL-TIME POSITIONS 6.0 6.0 6.0 7.0 7.0
303
Página 332
Water Treatment Plant
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 1,743,751 1,786,300 1,786,300 1,800,300 1,800,300 1%
MATERIALS & SUPPLIES 287,585 364,600 364,600 416,000 416,000 14%
ADMINISTRATIVE EXPENDITURES 682,119 1,050,600 1,050,600 881,100 881,100 -16%
OPERATING EXPENDITURES 2,713,454 3,201,500 3,201,500 3,097,400 3,097,400 -3%
CAPITAL OUTLAY 132,187 885,000 956,800 5,682,000 5,682,000 494%
TOTAL EXPENDITURES $ 2,845,641 $ 4,086,500 $ 4,158,300 $ 8,779,400 $ 8,779,400 111%
Highlights:
Added Career Ladder for Water Treatment & Production employees.
One vacancy to be filled in FY26.
304
Página 333
FY26 ANNUAL OPERATING BUDGET - DOVER, DELAWARE
WATER TREATMENT PLANT 400-40-76-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 1,006,124 | $ | 1,026,300 | $ | 1,026,300 | $ | 1,114,900 | $ | 1,114,900 | 9% |
| OVERTIME | 23,617 | 52,400 | 52,400 | 35,700 | 35,700 | -32% | |||||
| FICA TAXES | 75,340 | 82,500 | 82,500 | 88,000 | 88,000 | 7% | |||||
| HEALTH INSURANCE | 208,603 | 264,300 | 264,300 | 289,400 | 289,400 | 9% | |||||
| L I D INSURANCE | 4,626 | 4,300 | 4,300 | 8,700 | 8,700 | 102% | |||||
| WORKERS COMPENSATION | 55,652 | 59,800 | 59,800 | 63,700 | 63,700 | 7% | |||||
| PENSION | 360,412 | 286,500 | 286,500 | 189,000 | 189,000 | -34% | |||||
| OPEB | 9,377 | 10,200 | 10,200 | 10,900 | 10,900 | 7% | |||||
| PERSONNEL COSTS | 1,743,751 | 1,786,300 | 1,786,300 | 1,800,300 | 1,800,300 | 1% |
| CUSTODIAL | 42 | 100 | 100 | 100 | 100 | 0% |
| UNIFORMS/UNIFORM ALLOW | 6,293 | 8,800 | 8,800 | 10,300 | 10,300 | 17% |
| SECURITY/SAFETY MATERIALS | 6,571 | 3,300 | 3,300 | 3,300 | 3,300 | 0% |
| SMALL TOOLS | 5,480 | 6,700 | 6,700 | 12,000 | 12,000 | 79% |
| CHEMICALS & ADDITIVES | 233,497 | 307,600 | 307,600 | 342,300 | 342,300 | 11% |
| COMPUTER SOFTWARE | 500 | 500 | 500 | 500 | 500 | 0% |
| COMPUTER HARDWARE | - | 2,500 | 2,500 | 900 | 900 | -64% |
| CITY BLDG MAINT SUPPLIES | 15,069 | 13,700 | 13,700 | 12,100 | 12,100 | -12% |
| WELL SUPPLIES/REHAB | 20,133 | 21,400 | 21,400 | 34,500 | 34,500 | 61% |
| MATERIALS & SUPPLIES | 287,585 | 364,600 | 364,600 | 416,000 | 416,000 | 14% |
| TELEPHONE/FAX | 1,671 | 1,100 | 1,100 | 1,600 | 1,600 | 45% |
| ELECTRICITY | 395,641 | 432,000 | 432,000 | 458,000 | 458,000 | 6% |
| HEATING OIL/GAS | 3,565 | 5,000 | 5,000 | 5,000 | 5,000 | 0% |
| ADVERTISEMENT | 623 | 1,900 | 1,900 | 2,000 | 2,000 | 5% |
| SUBSCRIPTIONS AND DUES | 600 | 25,700 | 25,700 | 700 | 700 | -97% |
| TRAINING/CONF/FOOD/TRAVEL | 2,838 | 3,500 | 3,500 | 3,900 | 3,900 | 11% |
| CONTRACTUAL SERVICES | 215,503 | 523,400 | 523,400 | 345,300 | 345,300 | -34% |
| GASOLINE | 15,775 | 19,100 | 19,100 | 17,000 | 17,000 | -11% |
| OTHER EQUIP REPAIRS/MAINT | 39,638 | 32,400 | 32,400 | 39,800 | 39,800 | 23% |
| RADIO REPAIRS/MAINTENANCE | 6,265 | 6,500 | 6,500 | 7,800 | 7,800 | 20% |
| ADMINISTRATIVE EXPENDITURES | 682,119 | 1,050,600 | 1,050,600 | 881,100 | 881,100 | -16% |
OPERATING EXPENDITURES 2,713,454 3,201,500 3,201,500 3,097,400 3,097,400 -3%
| TRUCKS - PURCHASE | 46,487 | - | - | - | - | 0% |
| CONSTRUCTION PURCHASES | 85,700 | 885,000 | 956,800 | 5,682,000 | 5,682,000 | 494% |
| CAPITAL OUTLAY | 132,187 | 885,000 | 956,800 | 5,682,000 | 5,682,000 | 494% |
TOTAL EXPENDITURES $ 2,845,641 $ 4,086,500 $ 4,158,300 $ 8,779,400 $ 8,779,400 111%
PERSONNEL BUDGETED FULL-TIME POSITIONS 14.0 14.0 14.0 14.0 14.0
305
Página 334
THIS PAGE INTENTIONALLY LEFT BLANK
306
Página 335
PUBLIC UTILITIES WASTEWATER THE FOLLOWING SUBSECTIONS ARE INCLUDED:
WASTEWATER ENGINEERING & INSPECTIONS WASTEWATER MAINTENANCE
Página 336
THIS PAGE INTENTIONALLY LEFT BLANK
Página 337
WASTEWATER FUND BUDGET REVIEW
Fiscal Year 2025-2026
307
Página 338
THIS PAGE INTENTIONALLY LEFT BLANK
308
Página 339
0 0
011213453ÿ7238ÿ9454
43 ÿÿ41343 ÿ23
0113$ÿ 43 ÿÿ 41343 ÿ2 3
525 25 41343 ÿ94253545
41343 ÿ722ÿ 32238ÿ94253545ÿ
525 9 452ÿÿ
7513325ÿ 32238ÿ94253545ÿ
513 9 452ÿÿ
%ÿ 24213 43 ÿ 2ÿ! 15
0&'25ÿ011213453 9"ÿÿ#
9"ÿÿ#
309
Página 340
Department of Water & Wastewater
DEPARTMENTAL VISION
To provide services that are an integral part of our community and citizens’ everyday lives including Water and Wastewater Management, Water Treatment & Production and Engineering & Inspections services. The Department of Water & Wastewater (DWW) shall provide quality and effective services upon which the health, safety, and comfort of this community greatly depend.
DEPARTMENTAL MISSION STATEMENT
To enhance the quality of life in our community by providing safe, reliable, high-quality water and wastewater services with comprehensive engineering and inspections through skilled, team-oriented and diverse employees.
MAJOR PROGRAMS
CAPITAL IMPROVEMENT PROJECTS
Objective: The objective of this program is to provide upgrades and improvements to DWW Water, Wastewater, Street and Stormwater Fund assets including annual vehicle & equipment replacements, street, concrete and alley repair, stormwater improvement projects, inflow and infiltration removal projects, pump station replacements and upgrades, and miscellaneous emergency repairs of wastewater infrastructure, water quality improvements, wellhead redevelopment, and miscellaneous emergency repairs of water infrastructure as well as planned upgrades and additions to critical infrastructure such as the treatment plant, wells and tanks.
WATER MANAGEMENT
Objective: A primary objective of this program is to perform preventative maintenance and repair on approximately 233 miles of water main, 12,000 services within the right-of-way and 9,500 valves. This includes biannual flushing of the water system to improve the water quality for our customers. Objective: A primary objective of this program is to provide preventative maintenance and repair to approximately 1,800 fire hydrants to ensure availability and proper functioning in times of need. Objective: A primary objective of this program is to install, repair, replace and inspect over 12,000 water meters to ensure effective monitoring of the water system. Ensuring properly functioning meters allows the City to also become aware of significant water loss within the water system and conduct an investigation as required.
WATER TREATMENT & PRODUCTION
Objective: A primary objective of this program is to operate and maintain 21 production wells (producing over 1.9 billion gallons of water per year), 16 treatment facilities, and 7 elevated storage tanks (with a total capacity of 5.25 million gallons) in order to provide drinking water to the City of Dover. Performing regular maintenance on these assets improves system reliability resulting in a dependable product source to our customers. Objective: A primary objective of this program is to perform sampling of the drinking water at various locations throughout the City. An average of over 1,800 routing analyses are performed on our drinking water every month to ensure regulatory compliance and operational efficiency.
WASTEWATER MANAGEMENT
Objective: A primary objective of this program is to perform preventative maintenance and repair on approximately 160 miles of gravity sanitary sewer main, 12,000 sanitary sewer laterals within the right-of-way, 30 miles of force main and 3,700 manholes. This includes regular jetting of the gravity sanitary sewer mains and video inspection and evaluations as needed. This preventative maintenance work aids in decreasing the probability of blockages within the wastewater system.
310
Página 341
Objective: A primary objective of this program is to provide preventative maintenance and repair to 45 pumping stations to ensure proper functioning and transmission of flow to the Kent County Wastewater System as well as decreasing the probability of station failure and impacts to the environment.
ENGINEERING & INSPECTIONS
Objective: A primary objective is to provide capital improvement project design services as well as consultant oversight to ensure the most cost-effective projects are being constructed and implemented. Objective: A primary objective is to provide engineering analyses, Renovation Permit review, City Right-of-Way Permit review, engineering site plan / subdivision plan review, State Utility Permit completion and operation Division assistance with improvement development, which will increase operational efficiency to both the workforce and customers.
311
Página 342
Wastewater - Engineering
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 123,385 302,400 302,400 452,500 452,500 50%
MATERIALS & SUPPLIES 17,664 24,400 24,400 41,700 41,700 71%
ADMINISTRATIVE EXPENDITURES 19,000 55,200 55,200 22,000 22,000 -60%
OPERATING EXPENDITURES 160,049 382,000 382,000 516,200 516,200 35%
TOTAL EXPENDITURES $ 160,165 $ 382,000 $ 382,000 $ 516,200 $ 516,200 35%
Highlights:
Administrative Assistant transferred from General Fund.
New GIS position included for FY26.
312
Página 343
FY26 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
WASTEWATER ENGINEERING 402-41-26-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 81,537 | $ | 212,400 | $ | 212,400 | $ | 313,900 | $ | 313,900 | 48% |
| OVERTIME | 1,619 | 1,900 | 1,900 | 2,900 | 2,900 | 53% | |||||
| FICA TAXES | 6,107 | 13,700 | 13,700 | 21,400 | 21,400 | 56% | |||||
| HEALTH INSURANCE | 13,766 | 46,100 | 46,100 | 73,200 | 73,200 | 59% | |||||
| L I D INSURANCE | 372 | 900 | 900 | 2,500 | 2,500 | 178% | |||||
| WORKERS COMPENSATION | 613 | 800 | 800 | 1,600 | 1,600 | 100% | |||||
| EDUCATIONAL ASSISTANCE | - | - | - | 9,900 | 9,900 | 100% | |||||
| PENSION | 18,097 | 24,800 | 24,800 | 24,300 | 24,300 | -2% | |||||
| OPEB | 1,273 | 1,800 | 1,800 | 2,800 | 2,800 | 56% | |||||
| PERSONNEL COSTS | 123,385 | 302,400 | 302,400 | 452,500 | 452,500 | 50% |
| OFFICE SUPPLIES | 825 | 3,500 | 3,500 | 5,500 | 7,500 | 114% |
| UNIFORMS/UNIFORM ALLOW | 269 | 700 | 700 | 1,100 | 1,100 | 57% |
| BOOKS | - | 300 | 300 | 300 | 300 | 0% |
| SECURITY/SAFETY MATERIALS | - | 100 | 100 | 100 | 100 | 0% |
| SMALL TOOLS | 393 | 3,000 | 3,000 | 1,900 | 1,900 | -37% |
| COMPUTER SOFTWARE | 16,177 | 14,900 | 14,900 | 32,800 | 32,800 | 120% |
| COMPUTER HARDWARE | - | 1,900 | 1,900 | - | 1,700 | -11% |
| MATERIALS & SUPPLIES | 17,664 | 24,400 | 24,400 | 41,700 | 45,400 | 86% |
| TELEPHONE/FAX | 2,625 | 2,600 | 2,600 | 1,700 | 1,700 | -35% |
| SUBSCRIPTIONS AND DUES | 373 | 600 | 600 | 600 | 600 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 1,075 | 2,100 | 2,100 | 600 | 600 | -71% |
| CONTRACTUAL SERVICES | 13,886 | 46,800 | 46,800 | 18,000 | 18,000 | -62% |
| IN-HOUSE TRAINING | - | 1,800 | 1,800 | - | - | -100% |
| GASOLINE | 1,041 | 1,100 | 1,100 | 900 | 900 | -18% |
| RADIO REPAIRS/MAINTENANCE | - | 200 | 200 | 200 | 200 | 0% |
| ADMINISTRATIVE EXPENDITURES | 19,000 | 55,200 | 55,200 | 22,000 | 22,000 | -60% |
OPERATING EXPENDITURES 160,049 382,000 382,000 516,200 519,900 36%
TOTAL EXPENDITURES $ 160,165 $ 382,000 $ 382,000 $ 516,200 $ 519,900 36%
PERSONNEL BUDGETED FULL-TIME POSITIONS 2.5 2.5 2.5 4.5 4.5
313
Página 344
Wastewater Management
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 843,521 942,400 942,400 1,044,400 1,044,400 11%
MATERIALS & SUPPLIES 115,336 114,800 114,800 128,400 128,400 12%
ADMINISTRATIVE EXPENDITURES 352,668 311,800 311,800 351,600 351,600 13%
OPERATING EXPENDITURES 1,311,525 1,369,000 1,369,000 1,524,400 1,524,400 11%
CAPITAL OUTLAY 955,745 1,691,100 5,064,100 2,702,100 2,702,100 60%
TOTAL EXPENDITURES $ 2,267,269 $ 3,060,100 $ 6,433,100 $ 4,226,500 $ 4,226,500 38%
Highlights:
One vacancy to be filled in FY26.
314
Página 345
FY26 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
WASTEWATER MAINTENANCE 402-41-69-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 557,588 | $ | 598,800 | $ | 598,800 | $ | 651,200 | $ | 651,200 | 9% |
| OVERTIME | 47,759 | 38,000 | 38,000 | 53,200 | 53,200 | 40% | |||||
| FICA TAXES | 44,159 | 48,700 | 48,700 | 53,900 | 53,900 | 11% | |||||
| HEALTH INSURANCE | 115,857 | 177,900 | 177,900 | 176,200 | 176,200 | -1% | |||||
| L I D INSURANCE | 2,399 | 2,800 | 2,800 | 5,300 | 5,300 | 89% | |||||
| WORKERS COMPENSATION | 32,077 | 35,300 | 35,300 | 39,000 | 39,000 | 10% | |||||
| PENSION | 42,716 | 35,100 | 35,100 | 59,300 | 59,300 | 69% | |||||
| OPEB | 966 | 5,800 | 5,800 | 6,300 | 6,300 | 9% | |||||
| PERSONNEL COSTS | 843,521 | 942,400 | 942,400 | 1,044,400 | 1,044,400 | 11% |
| MEDICAL SUP & PHYSICALS | - | 1,200 | 1,200 | 1,200 | 1,200 | 0% |
| UNIFORMS/UNIFORM ALLOW | 3,749 | 6,800 | 6,800 | 8,600 | 8,600 | 26% |
| SECURITY/SAFETY MATERIALS | 4,666 | 3,000 | 3,000 | 1,600 | 1,600 | -47% |
| SMALL TOOLS | 1,905 | 5,500 | 5,500 | 5,500 | 5,500 | 0% |
| COMPUTER SOFTWARE | 6,500 | 6,700 | 6,700 | 6,700 | 6,700 | 0% |
| COMPUTER HARDWARE | 6,538 | 2,500 | 2,500 | 900 | 900 | -64% |
| CITY BLDG MAINT SUPPLIES | - | 500 | 500 | 500 | 500 | 0% |
| WATER/SEWER SYSTEM SUP | 17,324 | 18,400 | 18,400 | 16,400 | 16,400 | -11% |
| METERS/METER SUPPLIES | 31,450 | 30,000 | 30,000 | 38,000 | 38,000 | 27% |
| PUMPING STATION SUPPLIES | 34,381 | 37,000 | 37,000 | 37,000 | 37,000 | 0% |
| WATER/SEWER | 8,824 | 3,200 | 3,200 | 12,000 | 12,000 | 275% |
| MATERIALS & SUPPLIES | 115,336 | 114,800 | 114,800 | 128,400 | 128,400 | 12% |
| TELEPHONE/FAX | 19,239 | 18,700 | 18,700 | 19,500 | 19,500 | 4% |
| ELECTRICITY | 203,209 | 165,000 | 165,000 | 170,000 | 170,000 | 3% |
| HEATING OIL/GAS | 544 | 500 | 500 | 600 | 600 | 20% |
| TRAINING/CONF/FOOD/TRAVEL | 700 | 5,700 | 5,700 | 2,200 | 2,200 | -61% |
| CONSULTING FEES | - | 1,000 | 1,000 | 1,000 | 1,000 | 0% |
| CONTRACTUAL SERVICES | 95,159 | 87,200 | 87,200 | 119,400 | 119,400 | 37% |
| GASOLINE | 29,267 | 27,000 | 27,000 | 33,000 | 33,000 | 22% |
| MAINT EQUIP REPAIRS/MAINT | 4,550 | 2,500 | 2,500 | 1,500 | 1,500 | -40% |
| RADIO REPAIRS/MAINTENANCE | - | 4,200 | 4,200 | 4,400 | 4,400 | 5% |
| ADMINISTRATIVE EXPENDITURES | 352,668 | 311,800 | 311,800 | 351,600 | 351,600 | 13% |
OPERATING EXPENDITURES 1,311,525 1,369,000 1,369,000 1,524,400 1,524,400 11%
| TRUCKS - PURCHASE | 41,322 | 520,100 | 640,100 | 605,000 | 605,000 | 16% |
| OTHER EQUIPMENT | - | - | 30,000 | 18,600 | 18,600 | 100% |
| CONSTRUCTION - PURCHASE | 914,423 | 1,171,000 | 4,394,000 | 2,078,500 | 2,078,500 | 77% |
| CAPITAL OUTLAY | 955,745 | 1,691,100 | 5,064,100 | 2,702,100 | 2,702,100 | 60% |
TOTAL EXPENDITURES $ 2,267,269 $ 3,060,100 $ 6,433,100 $ 4,226,500 $ 4,226,500 38%
PERSONNEL BUDGETED FULL-TIME POSITIONS 11.0 11.0 11.0 11.0 11.0
315
Página 346
THIS PAGE INTENTIONALLY LEFT BLANK
316
Página 347
PUBLIC UTILITIES ELECTRIC THE FOLLOWING SUBSECTIONS ARE INCLUDED:
ELECTRIC GENERATION & POWER SUPPLY
ELECTRIC ADMINISTRATION
ELECTRIC ENGINEERING
ELECTRIC TRANSMISSION & DISTRIBUTION
SYSTEM OPERATIONS
Página 348
THIS PAGE INTENTIONALLY LEFT BLANK
Página 349
ELECTRIC FUND BUDGET REVIEW
Fiscal Year 2025-2026
317
Página 350
THIS PAGE INTENTIONALLY LEFT BLANK
318
Página 351
32ÿ32238 011213453ÿ7238ÿ9454 32ÿ23 025213432ÿ011213453 053ÿ7 ÿ 525 25 813ÿ 43251 45121125ÿÿ 5 4325 2132325 525 25 81ÿ1ÿ 253553 813ÿ 43251ÿ "25ÿ7 !ÿ 253553 .3&ÿ0 245ÿ 7 !ÿ"4 5 8ÿ 2 525 25ÿ7 !"4 "25ÿ) ÿ7 !ÿ 813ÿ 43ÿ#(% "4 ÿ#*% 324ÿ525 ÿÿ#$% "2545ÿ+13ÿ7411ÿ#+,% 700ÿ&52245ÿ 32ÿ9 3 ÿ &52245ÿ7 !ÿ"4 ÿ 24213ÿ#$% 32ÿ9 3 ÿ &52245ÿ 134325ÿ&ÿ7 !ÿ "2545ÿ$5ÿ7411ÿÿ#-% "4 134325ÿ&52245ÿÿ 525 ÿ72543ÿ #$% 525 25ÿ'2! "2545ÿ*ÿ7411ÿÿ#$% 319
Página 352
Electric Engineering
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 1,463,095 1,626,600 1,626,600 1,682,600 1,682,600 3%
MATERIALS & SUPPLIES 73,492 93,500 93,500 132,000 132,000 41%
ADMINISTRATIVE EXPENDITURES 163,561 216,900 216,900 237,400 237,400 9%
OPERATING EXPENDITURES 1,700,148 1,937,000 1,937,000 2,052,000 2,052,000 6%
CAPITAL OUTLAY 4,663,817 3,986,000 3,986,000 12,964,000 5,964,000 50%
TOTAL EXPENDITURES $ 6,363,965 $ 5,923,000 $ 5,923,000 $ 15,016,000 $ 8,016,000 35%
Highlights: One vacancy to fill in FY26 (additional GIS Specialist position converted from previous Electric Draftsman III position).
320
Página 353
FY26 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
ELECTRIC ENGINEERING 410-42-26-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED CHANGE | ||||||
| SALARIES | $ | 1,038,784 | $ | 1,129,000 | $ | 1,129,000 | $ | 1,152,400 | $ | 1,152,400 | 2% |
| OVERTIME | 20,057 | 16,800 | 16,800 | 17,200 | 17,200 | 2% | |||||
| FICA TAXES | 78,100 | 87,600 | 87,600 | 89,500 | 89,500 | 2% | |||||
| HEALTH INSURANCE | 139,760 | 202,000 | 202,000 | 205,300 | 205,300 | 2% | |||||
| L I D INSURANCE | 3,371 | 4,100 | 4,100 | 8,600 | 8,600 | 110% | |||||
| WORKERS COMPENSATION | 47,568 | 58,800 | 58,800 | 55,800 | 55,800 | -5% | |||||
| PENSION | 125,367 | 117,100 | 117,100 | 142,500 | 142,500 | 22% | |||||
| OPEB | 10,089 | 11,200 | 11,200 | 11,300 | 11,300 | 1% | |||||
| PERSONNEL COSTS | 1,463,095 | 1,626,600 | 1,626,600 | 1,682,600 | 1,682,600 | 3% |
| UNIFORMS/UNIFORM ALLOW | 4,794 | 7,700 | 7,700 | 9,000 | 9,000 | 17% |
| BOOKS | 491 | 500 | 500 | 500 | 500 | 0% |
| SECURITY/SAFETY MATERIALS | 9,906 | 8,500 | 8,500 | 20,200 | 20,200 | 138% |
| SMALL TOOLS | 809 | 2,600 | 2,600 | 7,600 | 7,600 | 192% |
| COMPUTER SOFTWARE | 32,232 | 37,900 | 37,900 | 62,700 | 62,700 | 65% |
| COMPUTER HARDWARE | 290 | 11,300 | 11,300 | 7,000 | 7,000 | -38% |
| ELEC MATERIALS/SUPPLIES | 24,969 | 25,000 | 25,000 | 25,000 | 25,000 | 0% |
| MATERIALS & SUPPLIES | 73,492 | 93,500 | 93,500 | 132,000 | 132,000 | 41% |
| TELEPHONE/FAX | 8,259 | 7,000 | 7,000 | 12,000 | 12,000 | 71% |
| ELECTRICITY | 2,075 | 2,000 | 2,000 | 2,000 | 2,000 | 0% |
| SUBSCRIPTIONS AND DUES | 700 | 700 | 2,700 | 2,700 | 286% | |
| TRAINING/CONF/FOOD/TRAVEL | 2,641 | 11,500 | 11,500 | 22,500 | 22,500 | 96% |
| CONTRACTUAL SERVICES | 97,891 | 118,300 | 118,300 | 120,800 | 120,800 | 2% |
| ENVIRONMENTAL EXPENSES | 29,036 | 45,000 | 45,000 | 45,000 | 45,000 | 0% |
| GASOLINE | 11,981 | 14,000 | 14,000 | 14,000 | 14,000 | 0% |
| OTHER EQUIP REPAIRS/MAINT | 5,881 | 10,000 | 10,000 | 10,000 | 10,000 | 0% |
| RADIO REPAIRS/MAINTENANCE | 5,798 | 8,400 | 8,400 | 8,400 | 8,400 | 0% |
| ADMINISTRATIVE EXPENDITURES | 163,561 | 216,900 | 216,900 | 237,400 | 237,400 | 9% |
OPERATING EXPENDITURES 1,700,148 1,937,000 1,937,000 2,052,000 2,052,000 6%
| OTHER EQUIP - PURCHASE | 51,771 | 45,000 | 614,900 | 95,000 | 95,000 | 111% |
| CONSTRUCTION - PURCHASE | 3,500 | 30,000 | 30,000 | 41,000 | 41,000 | 37% |
| TRANSMISSION/SWITCHES | 101,328 | 910,000 | 910,000 | 2,618,000 | 2,618,000 | 188% |
| DISTRIBUTION UPGRADES | 1,275,552 | 871,000 | 877,800 | 10,210,000 | 3,210,000 | 269% |
| CAPITAL OUTLAY | 4,663,817 | 3,986,000 | 7,485,500 | 12,964,000 | 5,964,000 | 50% |
TOTAL EXPENDITURES $ 6,363,965 $ 5,923,000 $ 9,422,500 $ 15,016,000 $ 8,016,000 35%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 11.0 | 11.0 | 11.0 | 11.0 | 11.0 |
| BUDGETED PART-TIME POSITIONS | - | - | - | - | - |
321
Página 354
Power Plant
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 801,042 669,000 669,000 693,600 693,600 4%
MATERIALS & SUPPLIES 20,049 49,200 49,200 46,200 46,200 -6%
ADMINISTRATIVE EXPENDITURES 1,300,445 1,578,600 1,578,600 1,499,800 1,499,800 -5%
OPERATING EXPENDITURES 2,121,536 2,296,800 2,296,800 2,239,600 2,239,600 -2%
CAPITAL OUTLAY 6,340,419 470,000 470,000 460,000 460,000 -2%
TOTAL EXPENDITURES $ 8,461,955 $ 2,766,800 $ 2,766,800 $ 2,699,600 $ 2,699,600 -2%
Highlights:
No significant changes to departmental budget in FY26.
322
Página 355
FY26 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
POWER PLANT OPERATIONS 410-42-80-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES & WAGES | $ | 643,227 | $ | 503,400 | $ | 503,400 | $ | 520,800 | $ | 520,800 | 3% |
| OVERTIME | 1,624 | 12,000 | 12,000 | 12,000 | 12,000 | 0% | |||||
| BURDEN @ 40% | 156,190 | 153,600 | 153,600 | 160,800 | 160,800 | 5% | |||||
| PERSONNEL COSTS | 801,042 | 669,000 | 669,000 | 693,600 | 693,600 | 4% |
| OFFICE SUPPLIES/SUBSCRIPT | 1,644 | 2,400 | 2,400 | 2,400 | 2,400 | 0% |
| MEDICAL SUPPLIES | 245 | 1,000 | 1,000 | 1,000 | 1,000 | 0% |
| SECURITY/SAFETY MATERIALS | 1,446 | 1,500 | 1,500 | 1,500 | 1,500 | 0% |
| SMALL TOOLS | 545 | 1,000 | 1,000 | 1,000 | 1,000 | 0% |
| WATER TREATMENT CHEMICALS | 10,291 | 18,000 | 18,000 | 18,000 | 18,000 | 0% |
| COMPUTER SOFTWARE | - | 13,300 | 13,300 | 13,300 | 13,300 | 0% |
| CITY BUILDING MAINTENANCE | 4,435 | 6,000 | 6,000 | 6,000 | 6,000 | 0% |
| WATER/SEWER | 1,443 | 6,000 | 6,000 | 3,000 | 3,000 | -50% |
| MATERIALS & SUPPLIES | 20,049 | 49,200 | 49,200 | 46,200 | 46,200 | -6% |
| OPERATOR INSURANCE | 718,273 | 902,000 | 902,000 | 833,600 | 833,600 | -8% |
| TELEPHONE | 4,520 | 6,000 | 6,000 | 6,000 | 6,000 | 0% |
| POSTAGE | 1,399 | 3,000 | 3,000 | 3,000 | 3,000 | 0% |
| ELECTRICITY | 50,352 | 84,000 | 84,000 | 72,000 | 72,000 | -14% |
| TRAINING/CONF/FOOD/TRAVEL | 170 | 8,000 | 8,000 | 8,000 | 8,000 | 0% |
| CONTRACTUAL SERVICES | 106,571 | 120,000 | 120,000 | 120,000 | 120,000 | 0% |
| ENVIRONMENT EXPENSES | 56,076 | 72,000 | 72,000 | 72,000 | 72,000 | 0% |
| OPERATOR MANAGEMENT FEE | 164,971 | 249,000 | 249,000 | 256,800 | 256,800 | 3% |
| HOME OFFICE LABOR | 3,047 | 12,000 | 12,000 | 12,000 | 12,000 | 0% |
| RIGHT OF WAY/PERMITS | 27,175 | 38,000 | 38,000 | 38,000 | 38,000 | 0% |
| GASOLINE | 415 | 2,400 | 2,400 | 2,400 | 2,400 | 0% |
| OTHER EQUIPT/MAINTENANCE | 9,901 | 16,000 | 16,000 | 12,000 | 12,000 | -25% |
| RADIO REPAIRS/MAINTENANCE | - | 2,200 | 2,200 | - | - | -100% |
| CONTINUOUS EMISSIONS MONI | 1,946 | 4,000 | 4,000 | 4,000 | 4,000 | 0% |
| FIRE PROTECTION SYSTEM | 4,233 | 6,000 | 6,000 | 6,000 | 6,000 | 0% |
| COMBUSTION TURBINE MAINT | 151,396 | 48,000 | 48,000 | 48,000 | 48,000 | 0% |
| POWER DISTRIBUTION SYSTEM | - | 6,000 | 6,000 | 6,000 | 6,000 | 0% |
| ADMINISTRATIVE EXPENDITURES | 1,300,445 | 1,578,600 | 1,578,600 | 1,499,800 | 1,499,800 | -5% |
OPERATING EXPENDITURES 2,121,536 2,296,800 2,296,800 2,239,600 2,239,600 -2%
| CONSTRUCTION-PURCHASE | 6,340,419 | 470,000 | 2,233,000 | 460,000 | 460,000 | -2% |
| CAPITAL OUTLAY | 6,340,419 | 470,000 | 2,233,000 | 460,000 | 460,000 | -2% |
TOTAL EXPENDITURES $ 8,461,955 $ 2,766,800 $ 4,529,800 $ 2,699,600 $ 2,699,600 -2%
PERSONNEL BUDGETED FULL-TIME POSITIONS 24.0 24.0 24.0 4.0 4.0
323
Página 356
Power Supply
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 % DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
65 SERIES TOTAL 717,002 801,800 801,800 829,900 829,900 4%
95 SERIES TOTAL 41,740,728 73,742,900 73,742,900 79,256,500 79,256,500 7%
98 SERIES TOTAL - 191,300 191,300 28,500 28,500 -85%
TOTAL EXPENDITURES $ 42,457,730 $ 74,736,000 $ 74,736,000 $ 80,114,900 $ 80,114,900 7%
Highlights:
No significant changes to departmental budget in FY26.
324
Página 357
FY26 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
POWER SUPPLY 410-42-81-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| CONTRACTUAL SERVICES | $ | 960 | $ | 50,000 | $ | 50,000 | $ | 50,000 | $ | 50,000 | 0% |
| LEGAL EXPENSES | 41,250 | 50,000 | 50,000 | 50,000 | 50,000 | 0% | |||||
| OPERATOR/SUPPLY MGMT FEE | 674,792 | 701,800 | 701,800 | 729,900 | 729,900 | 4% | |||||
| 65 SERIES TOTAL | 717,002 | 801,800 | 801,800 | 829,900 | 829,900 | 4% |
| 3RD PARTY HEDGE PURCHASES | 23,246,439 | 24,945,600 | 24,945,600 | 26,631,500 | 26,631,500 | 7% |
| CAPACITY CHARGES | 8,297,976 | 23,451,800 | 9,920,500 | 22,291,100 | 22,291,100 | -5% |
| CAPACITY CREDITS | (2,779,711) | (10,404,300) | (10,404,300) | (9,336,100) | (9,336,100) | -10% |
| SOLAR POWER SUPPLY | 2,765,102 | 3,700,800 | 3,700,800 | 3,361,200 | 3,361,200 | -9% |
| SOLAR RENEWAL ENERGY CREDIT | 360,223 | 381,900 | 381,900 | 375,100 | 375,100 | -2% |
| RENEWABLE ENERGY CREDITS | - | 6,429,200 | 6,429,200 | 6,465,100 | 6,465,100 | 1% |
| REGIONAL GREENHOUSE GAS | - | 70,500 | 70,500 | 87,500 | 87,500 | 24% |
| PJM CHARGES - TRANS. & FEES | 11,293,607 | 13,645,200 | 13,645,200 | 17,001,700 | 17,001,700 | 25% |
| PJM CHARGES - ENERGY | (304,046) | 11,932,000 | 11,932,000 | 12,675,700 | 12,675,700 | 6% |
| PJM CREDITS | (1,026,515) | (262,800) | (262,800) | (188,000) | (188,000) | -28% |
| PJM SPOT MARKET ENERGY | (112,347) | (147,000.00) | (147,000) | (108,300) | (108,300) | -26% |
| 95 SERIES TOTAL | 41,740,728 | 73,742,900 | 60,211,600 | 79,256,500 | 79,256,500 | 7% |
| GAS FUEL | 110,200 | 110,200 | 15,300 | 15,300 | -86% | |
| NO. 2 FUEL OIL | 81,100 | 81,100 | 13,200 | 13,200 | -84% | |
| 98 SERIES TOTAL | - | 191,300 | 191,300 | 28,500 | 28,500 | -85% |
TOTAL EXPENDITURES $ 42,457,730 $ 74,736,000 $ 61,204,700 $ 80,114,900 $ 80,114,900 7%
325
Página 358
Electric T&D
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 3,703,285 3,839,600 3,839,600 4,380,600 4,380,600 14%
MATERIALS & SUPPLIES 515,269 528,700 528,700 544,900 544,900 3%
ADMINISTRATIVE EXPENDITURES 668,058 836,800 836,800 811,300 811,300 -3%
OPERATING EXPENDITURES 4,886,611 5,205,100 5,205,100 5,736,800 5,736,800 10%
CAPITAL OUTLAY 2,060,304 3,090,000 3,090,000 2,600,000 2,400,000 -22%
TOTAL EXPENDITURES $ 6,946,916 $ 8,295,100 $ 8,295,100 $ 8,336,800 $ 8,136,800 -2%
Highlights:
One vacancy to be filled in Fy26.
Request included, to promote a 2nd Class Lineman to 1st Class Lineman.
326
Página 359
FY26 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
ELECTRIC TRANSMISSION & DISTRIBUTION 410-42-82-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 2,378,232 | $ | 2,476,300 | $ | 2,476,300 | $ | 2,678,200 | $ | 2,678,200 | 8% |
| OVERTIME | 180,543 | 172,900 | 172,900 | 188,100 | 188,100 | 9% | |||||
| FICA TAXES | 190,015 | 202,600 | 202,600 | 219,200 | 219,200 | 8% | |||||
| HEALTH INSURANCE | 297,519 | 374,800 | 374,800 | 376,200 | 376,200 | 0% | |||||
| L I D INSURANCE | 7,932 | 8,300 | 8,300 | 18,900 | 18,900 | 128% | |||||
| WORKERS COMPENSATION | 141,928 | 146,800 | 146,800 | 157,800 | 157,800 | 7% | |||||
| PENSION | 481,526 | 433,600 | 433,600 | 715,800 | 715,800 | 65% | |||||
| OPEB | 25,589 | 24,300 | 24,300 | 26,400 | 26,400 | 9% | |||||
| PERSONNEL COSTS | 3,703,285 | 3,839,600 | 3,839,600 | 4,380,600 | 4,380,600 | 14% |
| UNIFORMS/UNIFORM ALLOW | 16,478 | 22,400 | 22,400 | 34,400 | 34,400 | 54% |
| SECURITY/SAFETY MATERIALS | 77,745 | 31,000 | 31,000 | 41,200 | 41,200 | 33% |
| SMALL TOOLS | 21,463 | 28,000 | 28,000 | 25,000 | 25,000 | -11% |
| COMPUTER HARDWARE | 43 | 6,000 | 6,000 | 3,000 | 3,000 | -50% |
| METERS/METER SUPPLIES | 44,304 | 46,500 | 46,500 | 46,500 | 46,500 | 0% |
| WATER/SEWER | 338 | 1,500 | 1,500 | 1,500 | 1,500 | 0% |
| ELEC MATERIALS/SUPPLIES | 354,898 | 393,300 | 393,300 | 393,300 | 393,300 | 0% |
| MATERIALS & SUPPLIES | 515,269 | 528,700 | 528,700 | 544,900 | 544,900 | 3% |
| TELEPHONE/FAX | 13,733 | 11,800 | 11,800 | 11,800 | 11,800 | 0% |
| ELECTRICITY | 2,500 | 2,500 | 2,500 | 2,500 | 2,500 | 0% |
| HEATING OIL/GAS | 4,797 | 6,000 | 6,000 | 6,000 | 6,000 | 0% |
| INSURANCE | 2,175 | 20,000 | 20,000 | 20,000 | 20,000 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 28,999 | 42,000 | 42,000 | 20,000 | 20,000 | -52% |
| CONTRACTUAL SERVICES | 475,734 | 575,000 | 575,000 | 575,000 | 575,000 | 0% |
| ENVIRONMENTAL EXPENSES | 4,267 | 28,000 | 28,000 | 28,000 | 28,000 | 0% |
| RIGHT OF WAY | 5,955 | 6,000 | 6,000 | 6,000 | 6,000 | 0% |
| GASOLINE | 52,706 | 65,000 | 65,000 | 65,000 | 65,000 | 0% |
| TRUCK REPAIRS/MAINTENANCE | 34,573 | 40,000 | 40,000 | 40,000 | 40,000 | 0% |
| OTHER EQUIP REPAIRS/MAINT | 31,282 | 30,000 | 30,000 | 26,000 | 26,000 | -13% |
| RADIO REPAIRS/MAINTENANCE | 11,336 | 10,500 | 10,500 | 11,000 | 11,000 | 5% |
| ADMINISTRATIVE EXPENDITURES | 668,057.73 | 836,800 | 836,800 | 811,300 | 811,300 | -3% |
OPERATING EXPENDITURES 4,886,611 5,205,100 5,205,100 5,736,800 5,736,800 10%
| TRUCKS - PURCHASE | 186,578 | 460,000 | 808,800 | 200,000 | - | -100% |
| UG TRANSFORMERS | 241,677 | 1,000,000 | 900,000 | 1,000,000 | 1,000,000 | 0% |
| UG CONDUCTORS/DEVICES | 1,111,957 | 900,000 | 1,100,000 | 900,000 | 900,000 | 0% |
| METERS | 86,884 | 535,000 | 435,000 | 500,000 | 500,000 | -7% |
| CAPITAL OUTLAY | 2,060,304 | 3,090,000 | 3,905,400 | 2,600,000 | 2,400,000 | -22% |
TOTAL EXPENDITURES $ 6,946,916 $ 8,295,100 $ 9,110,500 $ 8,336,800 $ 8,136,800 -2%
PERSONNEL BUDGETED FULL-TIME POSITIONS 24.0 24.0 24.0 24.0 24.0
327
Página 360
Electric Administration
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 367,685 347,800 347,800 433,100 433,100 25%
MATERIALS & SUPPLIES 114,300 213,400 213,400 212,100 212,300 -1%
ADMINISTRATIVE EXPENDITURES 418,467 567,900 567,900 510,500 510,500 -10%
OPERATING EXPENDITURES 900,452 1,129,100 1,129,100 1,155,700 1,155,900 2%
CAPITAL OUTLAY 1,437,500 - - 60,000 60,000 100%
TOTAL EXPENDITURES $ 2,337,952 $ 1,129,100 $ 1,129,100 $ 1,215,700 $ 1,215,900 8%
Highlights:
Budgeted overlap for training of new Administrative Assistant.
328
Página 361
FY26 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
ELECTRIC ADMINISTRATION 410-42-84-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED | CHANGE | |||||
| SALARIES | $ | 244,239 | $ | 256,100 | $ | 256,100 | $ | 293,800 | $ | 293,800 | 15% |
| FICA TAXES | 18,387 | 19,600 | 19,600 | 22,500 | $ | 22,500 | 15% | ||||
| HEALTH INSURANCE | 20,155 | 25,900 | 25,900 | 37,300 | $ | 37,300 | 44% | ||||
| L I D INSURANCE | 1,299 | 1,500 | 1,500 | 2,600 | $ | 2,600 | 73% | ||||
| WORKERS COMPENSATION | 1,134 | 800 | 800 | 1,000 | $ | 1,000 | 25% | ||||
| PENSION | 79,584 | 41,300 | 41,300 | 73,000 | $ | 73,000 | 77% | ||||
| OPEB | 2,447 | 2,600 | 2,600 | 2,900 | $ | 2,900 | 12% | ||||
| PERSONNEL COSTS | 367,685 | 347,800 | 347,800 | 433,100 | 433,100 | 25% |
| OFFICE SUPPLIES | 568 | 1,000 | 1,000 | 2,000 | 2,200 | 120% |
| PRINTING AND DUPLICATING | 4,880 | 6,500 | 6,500 | 6,500 | 6,500 | 0% |
| MEDICAL SUP & PHYSICALS | 300 | 300 | 300 | 300 | 300 | 0% |
| COMPUTER HARDWARE | - | 2,000 | 2,000 | 1,500 | 1,500 | -25% |
| CITY BLDG MAINT SUPPLIES | 107,400 | 200,000 | 200,000 | 200,000 | 200,000 | 0% |
| WATER/SEWER | 1,152 | 1,100 | 1,100 | 1,800 | 1,800 | 64% |
| MATERIALS & SUPPLIES | 114,300 | 213,400 | 213,400 | 212,100 | 212,300 | -1% |
| TELEPHONE/FAX | 6,414 | 4,200 | 4,200 | 9,200 | 9,200 | 119% |
| ELECTRICITY | 22,936 | 19,000 | 19,000 | 24,000 | 24,000 | 26% |
| SUBSCRIPTIONS AND DUES | 85,982 | 135,400 | 135,400 | 92,000 | 92,000 | -32% |
| TRAINING/CONF/FOOD/TRAVEL | 1,497 | 4,000 | 4,000 | 3,000 | 3,000 | -25% |
| CONTRACTUAL SERVICES | 297,296 | 400,000 | 400,000 | 366,500 | 366,500 | -8% |
| LEGAL EXPENSES | - | - | - | 10,000 | 10,000 | 100% |
| COMMUNITY RELATIONS EXP | 4,342 | 5,000 | 5,000 | 5,500 | 5,500 | 10% |
| GASOLINE | - | 300 | 300 | 300 | 300 | 0% |
| ADMINISTRATIVE EXPENDITURES | 418,467 | 567,900 | 567,900 | 510,500 | 510,500 | -10% |
OPERATING EXPENDITURES 900,452 1,129,100 1,129,100 1,155,700 1,155,900 2%
| CONSTRUCTION - PURCHASE | 1,437,500 | - | 1,078,600 | 60,000 | 60,000 | 100% |
| CAPITAL OUTLAY | 1,437,500 | - | 1,078,600 | 60,000 | 60,000 | 100% |
TOTAL EXPENDITURES $ 2,337,952 $ 1,129,100 $ 2,207,700 $ 1,215,700 $ 1,215,900 8%
PERSONNEL BUDGETED FULL-TIME POSITIONS 3.0 3.0 3.0 3.0
329
Página 362
Electric Meter Reading
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 524,193 484,800 484,800 523,100 523,100 8%
MATERIALS & SUPPLIES 10,581 20,200 20,200 21,500 21,500 6%
ADMINISTRATIVE EXPENDITURES 18,310.72 24,800 24,800 24,800 24,800 0%
OPERATING EXPENDITURES 553,085 529,800 529,800 569,400 569,400 7%
CAPITAL OUTLAY - - - 50,800 50,800 100%
TOTAL EXPENDITURES $ 553,085 $ 529,800 $ 529,800 $ 620,200 $ 620,200 17%
Highlights: Approved promotion of Field Service Representative I to Field Representative II.
330
Página 363
FY26 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
METER READING 410-42-85-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED CHANGE | ||||||
| SALARIES | $ | 267,741 | $ | 292,600 | $ | 292,600 | $ | 284,300 | $ | 284,300 | -3% |
| OVERTIME | 16,400 | 16,400 | 16,400 | 26,400 | 26,400 | 61% | |||||
| FICA TAXES | 20,765 | 23,600 | 23,600 | 23,800 | 23,800 | 1% | |||||
| HEALTH INSURANCE | 51,385 | 72,500 | 72,500 | 89,600 | 89,600 | 24% | |||||
| L I D INSURANCE | 1,027 | 1,200 | 1,200 | 2,200 | 2,200 | 83% | |||||
| WORKERS COMPENSATION | 15,785 | 16,700 | 16,700 | 16,900 | 16,900 | 1% | |||||
| PENSION | 148,255 | 59,100 | 59,100 | 77,300 | 77,300 | 31% | |||||
| OPEB | 2,835 | 2,700 | 2,700 | 2,600 | 2,600 | -4% | |||||
| PERSONNEL COSTS | 524,193 | 484,800 | 484,800 | 523,100 | 523,100 | 8% |
| UNIFORMS/UNIFORM ALLOW | 5,657 | 9,700 | 9,700 | 9,700 | 9,700 | 0% |
| SECURITY/SAFETY MATERIALS | - | 100 | 100 | 100 | 100 | 0% |
| SMALL TOOLS | 1,355 | 4,400 | 4,400 | 4,400 | 4,400 | 0% |
| COMPUTER HARDWARE | - | 500 | 500 | 500 | 500 | 0% |
| METER READING SUPPLIES | 3,569 | 5,500 | 5,500 | 6,800 | 6,800 | 24% |
| MATERIALS & SUPPLIES | 10,581 | 20,200 | 20,200 | 21,500 | 21,500 | 6% |
| TELEPHONE/FAX | 2,863 | 2,800 | 2,800 | 2,800 | 2,800 | 0% |
| TRAINING/CONF/FOOD/TRAVEL | 250 | 500 | 500 | 500 | 500 | 0% |
| GASOLINE | 9,502 | 11,000 | 11,000 | 11,000 | 11,000 | 0% |
| AUTO REPAIRS/MAINTENANCE | - | 4,000 | 4,000 | 4,000 | 4,000 | 0% |
| OTHER EQUIP REPAIRS/MAINT | 4,786 | 5,000 | 5,000 | 5,000 | 5,000 | 0% |
| RADIO REPAIRS/MAINTENANCE | 910 | 1,500 | 1,500 | 1,500 | 1,500 | 0% |
| ADMINISTRATIVE EXPENDITURES | 18,310.72 | 24,800 | 24,800 | 24,800 | 24,800 | 0% |
OPERATING EXPENDITURES 553,085 529,800 529,800 569,400 569,400 7%
| OTHER EQUIP - PURCHASE | - | - | - | 50,800 | 50,800 | 100% |
| CAPITAL OUTLAY | - | - | - | 50,800 | 50,800 | 100% |
TOTAL EXPENDITURES $ 553,085 $ 529,800 $ 529,800 $ 620,200 $ 620,200 17%
PERSONNEL
| BUDGETED FULL-TIME POSITIONS | 4.0 | 4.0 | 4.0 | 4.0 |
| BUDGETED PART-TIME POSITIONS | - | - | - | - |
331
Página 364
Electric System operations
2023-2024 2024-2025 2024-2025 2025-2026 2025-2026 %
DESCRIPTION ACTUAL BUDGET REVISED REQUESTED RECOMMENDED CHANGE
PERSONNEL COSTS 960,121 1,067,500 1,067,500 1,159,400 1,159,400 9%
TOTAL EXPENDITURES 960,120.67 $ 1,067,500 $ 1,067,500 $ 1,159,400 $ 1,159,400 9%
Highlights:
No significant changes in departmental budget.
332
Página 365
FY26 ANNUAL OPERATING BUDGET ‐ DOVER, DELAWARE
SYSTEM OPERATIONS 410-42-86-99-000
| 2023-2024 | 2024-2025 | 2024-2025 | 2025-2026 | 2025-2026 | % | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| DESCRIPTION | ACTUAL | BUDGET | REVISED | REQUESTED | RECOMMENDED CHANGE | ||||||
| SALARIES | $ | 563,886 | $ | 602,500 | $ | 602,500 | $ | 630,100 | $ | 630,100 | 5% |
| OVERTIME | 114,431 | 151,100 | 151,100 | 149,600 | 149,600 | -1% | |||||
| FICA TAXES | 50,225 | 57,700 | 57,700 | 59,700 | 59,700 | 3% | |||||
| HEALTH INSURANCE | 88,191 | 112,600 | 112,600 | 117,400 | 117,400 | 4% | |||||
| L I D INSURANCE | 1,864 | 2,100 | 2,100 | 4,400 | 4,400 | 110% | |||||
| WORKERS COMPENSATION | 37,579 | 41,800 | 41,800 | 43,200 | 43,200 | 3% | |||||
| PENSION | 97,162 | 93,700 | 93,700 | 148,800 | 148,800 | 59% | |||||
| OPEB | 6,783 | 6,000 | 6,000 | 6,200 | 6,200 | 3% | |||||
| PERSONNEL COSTS | 960,121 | 1,067,500 | 1,067,500 | 1,159,400 | 1,159,400 | 9% |
TOTAL EXPENDITURES 960,120.67 $ 1,067,500 $ 1,067,500 $ 1,159,400 $ 1,159,400 9%
PERSONNEL BUDGETED FULL-TIME POSITIONS 5.0 5.0 5.0 5.0 5.0
333
Página 366
THIS PAGE INTENTIONALLY LEFT BLANK
334
Página 367
OTHER FUNDS THE FOLLOWING SUBSECTIONS ARE INCLUDED:
MUNICIPAL STREET AID FUND ELECTRIC RED-LIGHT PROGRAM REALITY TRANSFER TAX COMMUNITY TRANSPORTATION IMPROVEMENT FUND SUBSTANCE ABUSE PREVENTION PROGRAM LIBRARY GRANT COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) POLICE GRANTS LODGING TAX AMERICAN RESCUE PLAN ACT (ARPA) FUND ECONOMIC & COMMUNITY DEVELOPMENT AMBULANCE SERVICE WORKERS COMPENSATION FUND
Página 368
THIS PAGE INTENTIONALLY LEFT BLANK
Página 369
SPECIAL REVENUE FUNDS
Special Revenue Funds include the group of funds classified as grant funds and a Realty Transfer Tax Fund. The proceeds from specific revenue sources are restricted to specified expenditure purposes. The City adopts budgets for selected Special Revenue Funds. Combining and individual statements appear in this section.
MUNICIPAL STREET AID
The State of Delaware shares a portion of Delaware’s motor fuel tax revenue with local municipalities through grants. The amount of the grant the City receives depends on its population and miles of streets maintained.
ELECTRONIC RED-LIGHT SAFETY PROGRAM (ERLSP)
The State of Delaware Department of Transportation provides a grant to municipalities that implement the Electronic Red- Light Safety Program. Under this program, the City is granted a portion of the fines collected from drivers who are ticketed for running red lights installed with electronic photo identification equipment within the City limits.
REALTY TRANSFER TAX
Delaware Code states that realty transfer tax realized by the City shall be segregated from the general fund and the funds shall be expended solely for the capital and operating costs of public safety services, economic development programs, public works services, capital projects and improvements, infrastructure projects and improvements and debt reduction.
STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION GRANTS
The State of Delaware Department of Transportation grants provide funds for specific street projects in the City. State law provides funds to the State’s elected officials for suburban street aid, which officials can then provide to their respective districts. The City receives these funds for designated street projects and records all transactions for this fund.
SUBSTANCE ABUSE PREVENTION GRANT
The State of Delaware General Assembly Grant-In-Aid Program provides funds to implement an after-school program for at-risk and/or disadvantaged youths in the City of Dover. The City runs this program out of the Parks & Recreation Department.
335
Página 370
SPECIAL REVENUE FUNDS
(continued)
LIBRARY GRANTS
The City of Dover Public Library receives various grants and library tax receipts from the State of Delaware, Kent County, and the Federal Government. Activities associated with these grants are recorded in this fund.
CDBG HOUSING GRANTS & NEIGHBORHOOD STABILIZATION PROGRAM
The City receives a U.S. Department of Housing and Urban Development Entitlement Grant for the Community Development Block Grant Program. This is to provide decent housing, a suitable living environment and expand economic opportunities primarily for people of low and moderate incomes. Combined with the CDBG Fund is the Neighborhood Stabilization Program (NSP) that provides assistance in the redevelopment of residential properties that have been abandoned and foreclosed upon to stabilize residential communities.
POLICE GRANTS
The City of Dover Police Department receives various grants from the State of Delaware for public and highway safety and the U.S. Department of Justice for local law enforcement. All grant transactions are recorded in this fund.
LODGING TAX
In 2019 the Delaware General Assembly authorized Kent County and the City of Dover to charge up to 3% of the cost of a room rental at a hotel, motel or other overnight lodging business as provided in 30 Del C. §6101. On September 30, 2019, the Dover City Council approved Ordinance #2019-16 adopting a phased-in lodging tax for the City of Dover. On July 1, 2020, a tax of 0.5% was implemented. On July 1, 2021, the rate will be 1.0% and a year later the lodging tax will be increased to 1.5% and remain at that level unless changed by the City Council. City Council authorized increasing the tax to 3% effective July 1, 2024.
AMERICAN RESCUE PLAN ACT
On March 11, 2021, President Biden signed the American Rescue Plan Act of 2021 into law. The package was intended to combat the COVID-19 pandemic, including the public health and economic impacts. The city used this funding to invest in an array of drinking water infrastructure projects, such as building or upgrading facilities and transmission facilities, recreation infrastructure, assistance to non-profits addressing community needs, and in support of economically impacted industries.
ECONOMIC & COMMUNITY DEVELOPMENT
This fund provides for designation of certain proceeds from the sale of lots in Dover’s Garrison Oak Business and Technology Park, and other funds such as from grants, rents, shared revenues from joint initiatives, or other sources to be used to promote economic and community development activities benefiting the city.
336
Página 371
SPECIAL REVENUE FUNDS
(continued)
BASIC LIFE SAFETY AMBULANCE SERVICE FUND
This fund provides for the collection of fees and management of the expense of a city- wide ambulance service by contract with a service provider. The fee ensures the availability of service to all residents within the Dover Fire District. The Fund anticipates the potential that such a service may be provided directly by the city in the future.
FINANCIAL SCHEDULES PROPRIETARY FUND TYPES INTERNAL SERVICE FUNDS
WORKERS’ COMPENSATION INSURANCE FUND
The City has created this fund to account for the revenues and expenses related to a self- insured Workers’ Compensation Fund. The revenues are received from the City's various funds. These funds contribute to the Workers’ Compensation Fund an amount based on salaries at a pre-determined assessment rate. Claims paid, reinsurance cost and third- party administrator's fees are charged to this fund.
Budgetary schedule is included for public review of budgetary compliance.
337
Página 372
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
200 - MUNICIPAL STREET AID FUND CASH RECEIPTS
2024/25 $ DIFFERENCE % CHG 2023/2024 ORIGINAL 2024/25 2025/2026 FY26 VS FY26 VS ACTUAL BUDGET PROJECTED RECOMMENDED FY25 BUDGET FY25 VS
| BEGINNING BALANCE | - | 100 | 100 | 100 | - | 0.0% |
| STATE GRANT | 790,827 | 750,000 | 750,000 | 750,000 | - | 0.0% |
| INTEREST EARNED | 5,967 | - | 9,900 | - | - | 0.0% |
TOTALS 796,794 750,100 760,000 750,100 - 0.0%
BUDGET SUMMARY
| 2023/2024 | ORIGINAL | 2024/25 | 2025/2026 | FY26 VS | FY26 VS | |
|---|---|---|---|---|---|---|
| TRANSFER TO GENERAL FUND | 796,794 | 750,000 | 759,900 | 750,000 | - | 0.0% |
| TRANSFER TO GOVT CAPITAL FUND | - | - | - | - | - | 0.0% |
CURRENT YEAR BALANCE - 100 100 100 - 0.0%
TOTALS 796,794 750,100 760,000 750,100 - 0.0%
338
Página 373
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
ELECTRIC RED LIGHT PROGRAM CASH RECEIPTS
2024/25 $ DIFFERENCE % CHG 2023/2024 ORIGINAL 2024/25 2025/2026 FY26 VS FY26 VS ACTUAL BUDGET PROJECTED RECOMMENDED FY25 BUDGET FY25 VS
| BEGINNING BALANCE | 100 | 100 | 100 | 100 | - | 0.0% |
| POLICE FINES | 54,507 | 50,000 | 50,000 | 50,000 | - | 0.0% |
TOTALS 54,607 50,100 50,100 50,100 - 0.0%
BUDGET SUMMARY
ACTUAL BUDGET PROJECTED RECOMMENDED FY25 BUDGET FY25 VS
CURRENT YEAR BALANCE 100 100 100 100 - 0.0%
TOTALS 54,607 50,100 50,100 50,100 - 0.0%
339
Página 374
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
202 - REALTY TRANSFER TAX CASH RECEIPTS
2024/25 $ DIFFERENCE % CHG 2023/2024 ORIGINAL 2024/25 2025/2026 FY26 VS FY26 VS ACTUAL BUDGET PROJECTED RECOMMENDED FY25 BUDGET FY25 VS
| BEGINNING BALANCE | - | - | - | - | - | 0.0% |
| REALTY TRANSFER TAXES | 2,330,570 | 2,000,000 | 2,300,000 | 2,000,000 | - | 0.0% |
| INTEREST EARNED | 4,307 | - | 4,200 | - | - | 0.0% |
TOTALS 2,334,876 2,000,000 2,304,200 2,000,000 - 0.0%
BUDGET SUMMARY
| ACTUAL | BUDGET | PROJECTED | RECOMMENDED | FY25 BUDGET | FY25 VS | |
|---|---|---|---|---|---|---|
| TRANSFER TO GENERAL FUND | 2,334,876 | 2,000,000 | 2,304,200 | 2,000,000 | - | 0.0% |
CURRENT YEAR BALANCE - - - - - 0.0%
TOTALS 2,334,876 2,000,000 2,304,200 2,000,000 - 0.0%
340
Página 375
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
203 - COMMUNITY TRANSPORTATION IMPROVEMENT FUND
OPERATING REVENUES
2024/25 $ DIFFERENCE 2023/2024 2024/25 2025/2026 FY26 VS % ACTUAL BUDGET PROJECTED RECOMMENDED FY25 BUDGET CHANGE
| PRIOR YEAR BALANCE | 70,115 | 114,500 | 681,500 | 528,000 | 413,500 | 361.1% |
| GRANTS REVENUE | - | 40,000 | 186,700 | - | (40,000) | -100.0% |
| INTEREST INCOME | 7,765 | - | - | - | - | 0.0% |
TOTALS 77,880 154,500 868,200 528,000 373,500 241.7%
OPERATING EXPENSES
| ACTUAL | BUDGET | PROJECTED | RECOMMENDED | FY25 BUDGET | CHANGE | |
|---|---|---|---|---|---|---|
| PROGRAM EXP. CITY APPROPRIATED | - | - | - | - | - | 0.0% |
| OPERATING TRANSFERS - OUT | - | - | - | - | - | 0.0% |
CURRENT YEAR BALANCE (258,275) 114,500 - - (114,500) -100.0%
TOTALS 77,880 154,500 868,200 528,000 373,500 241.7%
341
Página 376
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
204 - SUBSTANCE ABUSE PREVENTION PROGRAM
OPERATING REVENUES
2024/25 $ DIFFERENCE 2023/2024 ORIGINAL 2024/25 2025/2026 FY26 VS % ACTUAL BUDGET PROJECTED RECOMMENDED FY25 BUDGET CHANGE
| PRIOR YEAR BALANCE | 43,429 | 9,200 | 51,210 | 51,210 | 42,010 | 456.6% |
| GRANTS REVENUE | 40,000 | 40,000 | 40,000 | 45,000 | 5,000 | 12.5% |
| RECREATION REVENUE | 45,195 | 33,000 | 33,000 | 45,000 | 12,000 | 36.4% |
TOTALS 128,624 82,200 124,210 141,210 59,010 71.8%
OPERATING EXPENSES
| ACTUAL | BUDGET | PROJECTED | RECOMMENDED | FY25 BUDGET | CHANGE | |
|---|---|---|---|---|---|---|
| PROGRAM EXPENSES/SUPPLIES | 41,078 | 30,000 | 30,000 | 45,000 | 15,000 | 50.0% |
| 28,810 | ||||||
| CURRENT YEAR BALANCE | 51,210 | 9,200 | 51,210 | 38,010 | 28,810 | 313.2% |
TOTALS 128,624 82,200 124,210 170,020 87,820 106.8%
342
Página 377
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
205 - LIBRARY GRANT
OPERATING REVENUES
2024/25 $ DIFFERENCE 2023/2024 ORIGINAL 2024/25 2025/2026 FY26 VS $ ACTUAL APPROVED PROJECTED RECOMMENDED FY25 BUDGET CHANGE
| PRIOR YEAR BALANCE | 166,240 | - | 159,917 | - | - | 0.0% |
| STATE GRANT | 381,603 | 381,603 | 396,939 | 397,400 | 15,797 | 4.1% |
| FEDERAL GRANT | 3,452 | 3,738 | 3,738 | 3,750 | 12 | 0.3% |
| OTHER GRANTS | - | - | - | - | - | 0.0% |
TOTALS 551,295 385,341 560,594 401,150 15,809 4.1%
OPERATING EXPENSES
| 2023/2024 | ORIGINAL | 2024/25 | 2025/2026 | FY26 VS | $ | |
|---|---|---|---|---|---|---|
| FURNITURE/FIXTURES | 50,213 | 15,003 | 90,256 | 30,800 | 15,797 | 105.3% |
| OFFICE SUPPLIES | 22,905 | 30,000 | 30,000 | 30,000 | - | 0.0% |
| PRINTING AND DUPLICATING | 2,582 | 10,000 | 10,000 | 10,000 | - | 0.0% |
| PROGRAM EXPENSES/SUPPLIES | 29,045 | 37,000 | 37,000 | 37,000 | - | 0.0% |
| BOOKS | 140,518 | 145,000 | 155,000 | 145,000 | - | 0.0% |
| COMPUTER SOFTWARE | 3,899 | 6,000 | 6,000 | 6,000 | - | 0.0% |
| COMPUTER HARDWARE | 32,347 | 30,000 | 50,000 | 30,000 | - | 0.0% |
| FED GRANT PROG EXP | - | - | - | - | - | 0.0% |
| AUDIO VISUAL SUPPLIES | 76,264 | 85,000 | 95,000 | 85,000 | - | 0.0% |
| POSTAGE | 79 | 100 | 100 | 100 | - | 0.0% |
| ADVERTISEMENT | 8,911 | 10,000 | 10,000 | 10,000 | - | 0.0% |
| TRAINING/CONF/FOOD/TRAV | 7,812 | 5,000 | 15,000 | 5,000 | - | 0.0% |
| CONSULTING FEES | - | - | - | - | - | 0.0% |
| CONTRACTUAL SERVICES | - | - | 50,000 | - | - | 0.0% |
| OFF EQP/REPAIRS & MAINT | 661 | 2,000 | 2,000 | 2,000 | - | 0.0% |
| OTHER EQUIP - PURCHASE | - | - | - | - | - | 0.0% |
| OTHER EQUIP - LEASE | 4,847 | 6,000 | 6,000 | 6,000 | - | 0.0% |
| STATE GRANT PROG EXP | - | 500 | 500 | 500 | - | 0.0% |
| SUBTOTAL EXPENSES STATE GRANTS | 380,083 | 381,603 | 556,856 | 397,400 | 15,797 | 4.1% |
FEDERAL GRANTS
| PROGRAM EXPENSES/SUPPLIES | 3,452 | 3,738 | 3,738 | 3,750 | 12 | 0.3% |
| SUBTOTAL EXPENSES FEDERAL GRANTS | 3,452 | 3,738 | 3,738 | 3,750 | 12 | 0.3% |
GRAND TOTAL EXPENSES 383,535 385,341 560,594 401,150 15,809 4.1%
CURRENT YEAR BALANCE 167,760 - - - - 0.0%
TOTALS 551,295 385,341 560,594 401,150 15,809 4.1%
343
Página 378
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
206 - COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)
OPERATING REVENUES
2024/25 $ DIFFERENCE 2023/2024 ORIGINAL 2024/25 2025/2026 FY26 VS % ACTUAL BUDGET PROJECTED RECOMMENDED FY25 BUDGET CHANGE
| PRIOR YEAR BALANCE CDBG | 1,141 | - | 339,365 | - | - | 0.0% |
| CDBG GRANTS RECEIVED | 288,802 | 309,594 | 309,594 | 318,000 | 8,406 | 2.7% |
| MISC. REVENUE | 26,000 | - | - | - | - | 0.0% |
TOTALS 315,943 309,594 648,959 318,000 8,406 2.7%
2024/25 $ DIFFERENCE
| Prior year Closing cost/down payment program | 10,837 | - | 90,516 | - | - | 0.0% |
| Prior year Dover Interfaith Ministry | 67,309 | - | 12,360 | - | - | 0.0% |
| Prior year Ncall Research Inc. | - | - | - | - | - | 0.0% |
| Prior year Connection Supp Program | - | - | - | - | - | 0.0% |
| Prior year MHDC emergency home repair | 28,200 | - | 99,399 | - | - | 0.0% |
| Prior year House of Hope | 7,220 | - | 23,077 | |||
| Prior year DIMH & Central DE Housing Collaborative | - | - | ||||
| Prior year Habitat for Humanity | - | - | - | - | - | 0.0% |
| Prior year Milford housing H/O rehab | 46,838 | - | 71,115 | - | - | 0.0% |
| Prior year Central Delaware Housing Collab | - | - | - | - | - | 0.0% |
| Prior year admin expense | 40,690 | 82,899 | ||||
| Prior year Cares Act COVID-19 | 23,651 | - | - | - | - | 0.0% |
| Current year closing cost/down payment program | 32,903 | 106,235 | 106,235 | 80,000 | (26,235) | -24.7% |
| Current year Connection Comm Supp program | - | - | - | - | - | 0.0% |
| Current year Dover Interfaith Ministry | - | 15,000 | 15,000 | - | (15,000) | -100.0% |
| Current year Ncall Research Inc. | - | - | - | - | - | 0.0% |
| Current year MHDC emergency home repair | - | - | - | 25,000 | 25,000 | 0.0% |
| Current year Habitat for Humanity | - | - | - | 25,000 | 25,000 | 0.0% |
| Current year MHDC homeowner rehab. | - | 40,000 | - | 35,000 | (5,000) | -12.5% |
| Current year House of Hope | 10,998 | 31,440 | 31,440 | - | (31,440) | -100.0% |
| Current year Milford housing H/O rehab | 523 | 55,000 | 55,000 | - | (55,000) | -100.0% |
| Current year DIMH & Central DE Housing Collaborative | 13,104 | - | - | - | - | 0.0% |
| Current year Cares Act COVID-19 | - | - | - | - | - | 0.0% |
| Current year Cares Act Hotel Voucher | - | - | - | |||
| Current year Central Delaware Housing Collab | - | - | - | 40,000 | ||
| Current year People's Community Center | - | - | - | 62,700 | ||
| Current year admin expense | 10,529 | 61,919 | 61,919 | 50,300 | (11,619) | -18.8% |
CURRENT YEAR BALANCE CDBG 23,141 - - - - 0.0%
TOTALS 341,943 309,594 648,959 318,000 8,406 2.7%
344
Página 379
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
207 - POLICE GRANTS
OPERATING REVENUES
2024/25 $ DIFFERENCE 2023/2024 ORIGINAL 2024/25 2025/2026 FY26 VS $ ACTUAL APPROVED PROJECTED RECOMMENDED FY25 BUDGET CHANGE
| PRIOR YEAR BALANCE | 4,412 | 1,063,200 | 2,318,700 | - | (1,063,200) | -100.0% |
| GRANTS RECEIVED | 807,481 | 619,400 | 619,400 | 585,900 | (33,500) | -5.4% |
| INTEREST INCOME | 25,408 | - | - | - | - | 0.0% |
TOTALS 837,301 1,682,600 2,938,100 585,900 (1,096,700) -65.2%
OPERATING EXPENSES
| ACTUAL | APPROVED | PROJECTED | RECOMMENDED | FY20 BUDGET | CHANGE | |
|---|---|---|---|---|---|---|
| GRANT FUNDED SALARIES | 66,259 | - | - | - | - | 0.0% |
| GRANT FUNDED FICA | - | - | - | - | - | 0.0% |
| GRANT FUNDED W/COMP | - | - | - | - | - | 0.0% |
| MATERIALS AND SUPPLIES | ||||||
| FURNITURE & FIXTURES | - | - | - | - | - | 0.0% |
| PROGRAM EXPENSE | 308,589 | 785,000 | 1,421,100 | - | (785,000) | -100.0% |
| OFFICE & COMPUTER SUPP | - | - | - | - | - | 0.0% |
| PHOTO EQUIPT & SUPPLIES | - | - | - | - | - | 0.0% |
| POLICE EQUIPT & PROG SUPP | - | - | - | - | - | 0.0% |
| ADMINISTRATIVE EXPENDITURES | ||||||
| CELL PHONE CHARGES | - | - | - | - | - | 0.0% |
| TRAINING | 18,720 | 20,000 | 20,000 | - | (20,000) | -100.0% |
| AUDIT FEES | - | - | - | - | - | 0.0% |
| CONTRACTUAL SERVICES | 383,175 | - | 739,000 | - | - | 0.0% |
| VEHICLE MAINT & EQUIPT | - | - | - | - | - | 0.0% |
| CAPITAL OUTLAY | ||||||
| VEHICLE PURCHASE | - | - | - | - | - | 0.0% |
| TOTAL EXPENDITURES | 776,743 | 805,000 | 2,180,100 | - | (805,000) | -100.0% |
OTHER FINANCING USES
| OPERATING TRANSFERS-OUT | 763,810 | 379,400 | 758,000 | 765,000 | 385,600 | 101.6% |
| TOTAL FINANCING USES | 763,810 | 379,400 | 758,000 | 765,000 | 385,600 | 101.6% |
CURRENT YEAR BALANCE (703,252) 498,200 - (179,100) (677,300) -135.9%
TOTALS 837,301 1,682,600 2,938,100 585,900 (1,096,700) -65.2%
THE ABOVE BUDGET INCLUDES THE POLICE GRANTS FUND, USDOJ BYRNE GRANTS FUND AS WELL AS THE OTHER FEDERAL POLICE GRANTS FUND.
345
Página 380
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
209 - POLICE GRANTS
OPERATING REVENUES
2024/25 $ DIFFERENCE 2023/2024 ORIGINAL 2024/25 2025/2026 FY26 VS $ ACTUAL APPROVED PROJECTED RECOMMENDED FY25 BUDGET CHANGE
| PRIOR YEAR BALANCE | 203,026 | - | 185,713 | - | - | 0.0% |
| GRANTS RECEIVED | 370,178 | 390,000 | 780,000 | 339,700 | (50,300) | -12.9% |
| INTEREST INCOME | - | - | - | - | - | 0.0% |
TOTALS 573,204 390,000 965,713 339,700 (50,300) -12.9%
OPERATING EXPENSES
| ACTUAL | APPROVED | PROJECTED | RECOMMENDED | FY25 BUDGET | CHANGE | |
|---|---|---|---|---|---|---|
| CADET PROGRAM SALARIES | - | - | - | - | - | 0.0% |
| CADET PROGRAM FICA | - | - | - | - | - | 0.0% |
| CADET PROGRAM W/COMP | - | - | - | - | - | 0.0% |
| MATERIALS AND SUPPLIES | ||||||
| FURNITURE & FIXTURES | - | - | 0.0% | |||
| OFFICE & COMPUTER SUPP | - | 0.0% | ||||
| PHOTO EQUIPT & SUPPLIES | - | 0.0% | ||||
| POLICE EQUIPT & PROG SUPP | 305,473 | 342,500 | 170,000 | 110,600 | (231,900) | -67.7% |
| ADMINISTRATIVE EXPENDITURES | ||||||
| CONTRACTUAL SERVICES | 6,959 | - | - | - | - | 0.0% |
| TOTAL EXPENDITURES | 312,433 | 342,500 | 170,000 | 110,600 | (231,900) | -67.7% |
OTHER FINANCING USES
| OPERATING TRANSFERS-OUT | 75,058 | 47,500 | 12,000 | 50,000 | 2,500 | 5.3% |
| TOTAL FINANCING USES | 75,058 | 47,500 | 12,000 | 50,000 | 2,500 | 5.3% |
CURRENT YEAR BALANCE 185,713 - 783,713 179,100 179,100 0.0%
TOTALS 573,204 390,000 965,713 339,700 (50,300) -12.9%
346
Página 381
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
208 - LODGING TAX CASH RECEIPTS
2024/25 $ DIFFERENCE % CHG 2023/2024 ORIGINAL 2024/25 2025/2026 FY26 VS FY26 VS ACTUAL BUDGET PROJECTED RECOMMENDED FY25 BUDGET FY25 VS
| BEGINNING BALANCE | - | - | - | - | - | 0.0% |
| LODGING TAXES | 443,995 | 1,000,000 | 1,000,000 | 1,000,000 | - | 0.0% |
TOTALS 443,995 1,000,000 1,000,000 1,000,000 - 0.0%
BUDGET SUMMARY
| ACTUAL | BUDGET | PROJECTED | RECOMMENDED | FY25 BUDGET | FY25 VS | |
|---|---|---|---|---|---|---|
| TRF TO GOV'T CAPITAL PRJCTS (101) | 443,995 | 500,000 | 500,000 | 500,000 | - | 0.0% |
| TRF TO GOV'T OPERATING FUND (100) | - | 500,000 | 500,000 | 500,000 | - | 0.0% |
CURRENT YEAR BALANCE - - - - - 0.0%
TOTALS 443,995 1,000,000 1,000,000 1,000,000 - 0.0%
347
Página 382
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
210 - AMERICAN RESCUE PLAN ACT FUND
OPERATING REVENUES
$ DIFFERENCE 2023/2024 2024/25 2025/2026 FY26 VS % ACTUAL PROJECTED RECOMMENDED FY25 BUDGET CHANGE
| PRIOR YEAR BALANCE | 2,417,074 | 2,864,200 | - | (2,417,074) | -200.0% |
| INTEREST INCOME | 138,907 | 75,000 | - | (138,907) | -200.0% |
TOTALS 2,555,981 2,939,200 - (2,555,981) 0.0%
OPERATING EXPENSES
| APPROVED | PROJECTED | RECOMMENDED | FY25 BUDGET CHANGE | |
|---|---|---|---|---|
| CONSTRUCTION | 2,616,091 | 1,401,000 | - | (2,616,091) 0.0% |
| OPERATING TRANSFERS - OUT | - | - | - | 0.0% |
CURRENT YEAR BALANCE (582,113) 348,500 - 582,113 0.0%
TOTALS 2,555,981 2,939,200 - 1,809,600 0.0%
348
Página 383
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
211 - ECONOMIC & COMMUNITY DEVELOPMENT
OPERATING REVENUES
2023/2024 $ DIFFERENCE ORIGINAL 2024/2025 2025/2026 FY26 VS % APPROVED PROJECTED RECOMMENDED FY25 BUDGET CHANGE
| PRIOR YEAR BALANCE | 734,000 | 734,000 | 713,900 | (20,100) | -102.7% |
| MISC RECEIPTS | - | 24,000 | - | - |
TOTALS 734,000 758,000 713,900 (20,100) 0.0%
OPERATING EXPENSES
| ORIGINAL | 2024/2025 | 2025/2026 | FY26 VS | % | |
|---|---|---|---|---|---|
| PROGRAM EXPENSE | - | 44,100 | - | - | 0.0% |
| CURRENT YEAR BALANCE | 734,000 | 713,900 | 713,900 | (20,100) | 0.0% |
TOTALS 734,000 713,900 713,900 (20,100) 0.0%
349
Página 384
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
212 -AMBULANCE SERVICE
OPERATING REVENUES
2023/2024 $ DIFFERENCE ORIGINAL 2024/25 2025/2026 FY26 VS % APPROVED RECOMMENDED RECOMMENDED FY25 BUDGET CHANGE
| PRIOR YEAR BALANCE | - | - | - | - | 0.0% |
| AMBULANCE REVENUE | - | 850,000 | 850,000 | 850,000 | 0.0% |
| INTEREST INCOME | - | - | - | - | 0.0% |
TOTALS - 850,000 850,000 850,000 0.0%
OPERATING EXPENSES
| APPROVED RECOMMENDED RECOMMENDED | FY25 BUDGET | CHANGE | |||
|---|---|---|---|---|---|
| TRANSFER TO RESERVE | - | 250,000 | 250,000 | 250,000 | 0.0% |
CURRENT YEAR BALANCE - 850,000 850,000 850,000 0.0%
TOTALS - 850,000 850,000 850,000 0.0%
350
Página 385
FY 2026 DRAFT ANNUAL OPERATING BUDGET - DOVER, DELAWARE
600 - WORKER'S COMPENSATION FUND
OPERATING REVENUES
2024/25 $ DIFFERENCE 2023/2024 ORIGINAL 2024/25 2025/2026 FY26 VS % ACTUAL BUDGET PROJECTED RECOMMENDED FY25 BUDGET CHANGE
| BEGINNING BALANCE | 4,469,902 | 4,138,000 | 5,424,683 | 6,449,683 | 2,311,683 | 55.9% |
| INTEREST INCOME | 158,837 | 120,000 | 200,000 | 200,000 | 80,000 | 66.7% |
| PREMIUM FROM CITY | 1,288,194 | 1,144,000 | 1,300,000 | 1,352,000 | 208,000 | 18.2% |
TOTALS 5,916,932 5,402,000 6,924,683 8,001,683 2,599,683 48.1%
2024/25 $ DIFFERENCE 2023/2024 ORIGINAL 2024/25 2025/2026 FY26 VS % ACTUAL BUDGET PROJECTED RECOMMENDED FY25 BUDGET CHANGE
| OFFICE SUPPLIES | - | 0.0% | ||||
| PRINTING DUPLICATING | - | 0.0% | ||||
| PROGRAM EXPENSE - CLAIMS | 215,632 | 300,000 | 140,000 | 300,000 | - | 0.0% |
| INSURANCE | 225,412 | 200,000 | 280,000 | 300,000 | 100,000 | 50.0% |
| STATE OF DEL - SELF INSURANCE TAX | 16,773 | 30,000 | 32,000 | 30,000 | - | 0.0% |
| CONTRACTUAL SERVICES | 34,433 | 35,000 | 23,000 | 30,000 | (5,000) | -14.3% |
TOTAL EXPENSES 492,249 565,000 475,000 660,000 90,000 16.8%
CURRENT YEAR BALANCE 5,424,683 4,837,000 6,449,683 7,341,683 2,504,683 51.8%
TOTALS 5,916,932 5,402,000 6,924,683 8,001,683 2,599,683 48.1%
351
Página 386
THIS PAGE INTENTIONALLY LEFT BLANK
352