Ir al contenido principal
AskDover

Planning Commission Meeting Paperless Packet

Planning Commission. 20 de enero de 2026.

Abrir el PDF (50.5 MB)

Este texto se extrajo de el PDF de forma automática y puede contener errores. El PDF es el registro oficial, así que consúltelo antes de confiar en esto.

Página 1

CITY OF DOVER, DELAWARE

PLANNING COMMISSION

Tuesday, January 20, 2026 at 6:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware

AGENDA

Written comments are accepted via mail to City of Dover – Planning Commission, P.O. Box 475 Dover DE 19903 and via email at CompPlan@dover.de.us.

IN-PERSON AND VIRTUAL MEETING NOTICE

The Planning Commission Meeting for January 20, 2026 will be held at City Hall in City Council Chambers at 6:00PM and as a Virtual Meeting using Webex, an audio/video conferencing system as an electronic means of communication. The public is welcome to attend. See participation

PUBLIC PARTICIPATION INFORMATION

City of Dover Planning Commission Meeting of January 20, 2026 at 6:00PM

Join By Phone: 1-650-479-3208
Access Code: 253 801 08831
Password from Phones: 3683772

Join Online: https://bit.ly/PCMeeting01202026
Webinar Number: 2538 010 8831
Webinar Password: DoverPC

If you are new to Webex get the app now at https://www.webex.com/ to be ready when the meeting starts. For problems accessing the meeting, please call the Planning Office at (302) 736-7196.

CALL TO ORDER

PLEDGE OF ALLEGIANCE

ROLL CALL

ADOPTION OF AGENDA

APPROVAL OF MINUTES

  • 1.Adoption of Meeting Minutes of December 15, 2025

1

Página 2

PLANNING COMMISSION - January 20, 2026 PAGE 2

COMMUNICATIONS & REPORTS

Meeting Reminder: The next Planning Commission regular meeting date is Tuesday, February 17, 2026.

Update on City Council Actions

Department of Planning & Inspections Updates

  • 2.Schedule of Deadlines and Meetings for 2026

OPENING REMARKS CONCERNING MEETING PROCEDURES FOR APPLICATIONS

OLD BUSINESS

Request Extension of Planning Commission Approval

NEW APPLICATIONS

  • 3.S-26-01 Bayhealth Medical Center, Inc. - Kent Campus: Master Plan Phases 1-3 – Public Hearing and Review of the Site Development Master Plan and Parcel Consolidation Plan for the Bayhealth Medical Center – Kent Campus. The Master Plan outlines three (3) phases (with subphases) of construction as follows: Phase 1A – Emergency Department 2-story Expansion (Overbuild) and Central Services Building 6,000 SF Addition; Phase 1B - Bed Tower 6-story Overbuild; Phase 2A – New 5-story Parking Garage (500 spaces) and Main Entry Addition with Drop-off Area; Phase 2B – Demolition of Existing Parking Garage and a Podium Expansion as 3-story Surgical Pavilion; Phase 2C - Emergency Department 3-story Expansion; and Phase 3 - Demolition of Existing Legacy Building. The properties involved consist of a total land area of 22.55 acres ±. The properties are zoned IO (Institutional and Office Zone) and partially subject to the SWPOZ (Source Water Protection Overlay Zone). The project is generally located in the block created by South State Street, Hope Street, South Governors Avenue, and South Street with additional project area located on the north side of South Street. The main property address is 640 South State Street. The owner of record is Bayhealth Medical Center Inc. Tax Parcels: ED-05-077.13-01-52.00-000, ED-05-077.13-01-48.00-000, ED-05-077.13-01-18.00- 000, ED-05-077.13-01-18.01-000, ED-05-077.13-02-01.00-000, ED-05-077.13-01-02.00-000, and ED-05-077.13-02-12.00-000. Council District 2. Waiver Request: Reduction of Bicycle Parking Requirement, For Consideration: Parking Adequacy Statement/Reduction of Parking Requirement. The Board of Adjustment on October 15, 2025 granted approval of variances for the front yard setback and to allow a building height of 175 feet (V-25-05).
  • 4.S-26-02 R.E. Pierson Regional Headquarters (Office, Garage and Contractors yard) at 30 Lafferty Lane – Public Hearing and Review of a Site Plan Application to permit the construction of R. E. Pierson Regional Headquarters to consist of a 9,900 SF Office Building, a 9,600 SF Garage with a fenced Contractors Work Yard (laydown and equipment storage) area, and associated site improvements. The project development area is 5.284 acres of the overall parcel of 29.6135 acres. The property is zoned M (Manufacturing Zone) and is subject to the AEOZ (Airport Environs Overlay Zone): Accident Potential Zone I (APZ I) and Noise Zone A. The property is located on the south side of Lafferty Lane between Bay Road and Horsepond Road. The owner of record is Richard E. Pierson Construction, Co. Property Address: 30 Lafferty Lane. Tax Parcel Number: ED-05-077.00-01-28.03-000. Council District 2. Waiver

2

Página 3

PLANNING COMMISSION - January 20, 2026 PAGE 3

Requests: Partial Elimination of Sidewalk, Partial Elimination of Upright Curbing. For Consideration: Performance Standards Review Application.

  • 5.S-26-03 The Enclave Apartments: Revised Walker Road Apartments – Public Hearing and Review of a Site Development Application for the construction of two (2) three story, garden style apartment buildings consisting of twenty-four (24) units each for a total of 48 units. Also proposed are a Clubhouse, parking lot improvements, and four (4) outdoor recreation areas. The property is zoned RM-2 (Medium Density Residence Zone). The subject site consists of one parcel totaling 6.08 acres +/- located on the north side of Walker Road and west of Independence Boulevard. The owner of record is Dover Synergy Group, LLC. Property Address: unaddressed parcel on Walker Road. Tax Parcel: ED-05-067.18-01-71.00-000. Council District 4. Waiver Request: Partial Elimination of Upright Curbing. For Consideration: Active Recreation Area Plan. The project was previously reviewed as S-23-22 Walker Road Apartments in December of 2023; that plan is being superseded.
  • 6.S-26-04 DuPont Plaza at 747 N. DuPont Highway: Revised Master Plan – Public Hearing and Review of a Revised Site Development Master Plan with Minor Subdivision Plan to permit phased construction of a retail center known as DuPont Plaza. The center consists of four buildings totaling 44,366 SF and is to be constructed in phases. The buildings proposed include a 7,440 SF Building A - Retail; 12,950 SF Building B - Retail; 2,046 SF Building C – Restaurant; and 21,930 SF Building D – Retail (Tractor Supply). The property consists of 9.954 acres and is proposed to be subdivided into multiple lots. The property is zoned SC-2 (Community Shopping Center Zone) and subject to the SWPOZ (Source Water Protection Overlay Zone). The property is located on the east side of North DuPont Highway and south of Leipsic Road. The owner of record is Rojan 15 DD, LLC. Property Address: 747 North DuPont Highway. Tax Parcel: ED-05-068.05-01-15.00-000. Council District 3. PLUS #2018- 02-02. Waiver Requests: Subdivision Waiver – Lots without Public Street Frontage. This site was subject to S-19-03 Retail Center at 747 N. DuPont Highway: Master Plan reviewed by Planning Commission in 2019 with its Final Plan approval issued in 2021 along with Administrative Site Plan S-19-18 DuPont Plaza: Phase 1; the plans are expired. A proposed Revised Master Plan S-22-12 DuPont Plaza did not complete the review process.

NEW BUSINESS

PUBLIC COMMENTS OPPORTUNITY

ADJOURN

Posted Agenda: January 9, 2026

THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING

3

Página 4

Item 1.

CITY OF DOVER PLANNING COMMISSION

December 15, 2025

The Meeting of the City of Dover Planning Commission was held on Monday, December 15, 2025, at 7:00 PM as an In-Person Meeting and also using the phone/videoconferencing system Webex. The Meeting Session was conducted with Chair Mr. Witham presiding. Members present were Mr. Lewis, Mr. Roach (virtual), Mrs. Denney, Mrs. Maucher (virtual), Mr. Baldwin, Dr. Jones, Mr. Reaves (virtual), Mrs. Welsh, and Mr. Witham.

Staff members present were Mrs. Dawn Melson-Williams, Ms. Sharon Duca, Mr. Jason Lyon and Mrs. Kristen Mullaney.

APPROVAL OF AGENDA

Mrs. Denney moved to approve the Agenda as presented, seconded by Mrs. Welsh and the motion was carried 9-0.

APPROVAL OF MEETING MINUTES OF OCTOBER 20, 2025

Mrs. Welsh moved to approve the Planning Commission Meeting Minutes of October 20, 2025, seconded by Mrs. Denney and the motion was carried 9-0.

COMMUNICATIONS & REPORTS

Mrs. Melson-Williams stated that the next Planning Commission regular meeting is scheduled for Tuesday, January 20, 2026. Monday is a holiday so your meeting will move to that Tuesday. She will let the Commission know that we do have four applications that have been filed for that evening and if there is no objection, she is recommending that we start that meeting at 6PM rather than 7PM. If that seems amenable to the Planning Commission by consensus, we will move forward with that timeframe. (There was no objection.)

Mrs. Melson-Williams provided an update on the regular City Council and various Committee meetings held on October 27 & 28, 2025; November 10, 2025; November 24 & 25, 2025 and December 8 & 9, 2025.

Mrs. Melson-Williams stated that we are winding down the calendar year. We’ve stayed pretty busy even though the holidays are approaching. One thing that they did prepare for the Commission this evening is a Draft Schedule of Deadlines and Meetings for 2026. This outlines the application deadline process, the involved City Council and various Development Advisory Committee Meetings as well as the Planning Commission Meetings for the year. Your Planning Commission Meetings are scheduled to remain on the third Monday of each month unless that Monday is a holiday which happens in January and February. With this, you can see the schedule for the upcoming year. If there are no concerns with it, we will work to finalize it and work with our applicants as they seek to appear before you.

OPENING REMARKS CONCERNING DEVELOPMENT APPLICATIONS

Mrs. Melson-Williams presented the audience information on policies and procedures for the In- Person Meeting and Virtual Meeting using the Webex system.

1
4

Página 5

CITY OF DOVER PLANNING COMMISSION DECEMBER 15, 2025

Item 1.

OLD BUSINESS

Requests for Extensions of Planning Commission Approval: None

NEW APPLICATIONS

S-25-07 Revised The Old Post at 55 Loockerman Plaza – Public Hearing and Review of a Revised Site Development Plan Application and associated Revised Architectural Review Certification for redevelopment of the Old Dover Post Office property consisting of 1.267 acres for a mixed-use project known as The Old Post. The project involves the demolition of the rear warehouse portion of the existing building and adaptive re-use of part of the front 4,560 SF portion of the building for restaurant, commercial retail or business space and apartment units. In this Revision are proposed increases in apartment unit count from 36 to 42 units and architectural changes consisting of a second floor addition to the front wings of the building and a four-story 43,092 SF building addition proposed for a total forty-two (42) residential apartment units and with parking and other site improvements. The property is zoned C-2 (Central Commercial Zone), subject to the SWPOZ (Source Water Protection Overlay Zone), and subject to the H (Historic District Zone). The property is located on the north side of Loockerman Plaza and adjacent to Innovation Way. The owner of record is Old Post, LLC. Property Address: 55 Loockerman Plaza. Tax Parcel: ED-05-077.05-04-53.00-000. Council District 4. For Consideration: Revised Parking Strategy Statement and Active Recreation Area Plan. This Revised project is the subject of HI-25-01 Revised The Old Post for Historic District Commission Review and Recommendation on the Architectural Review Certification on November 20, 2025.

Representative: Mr. Frank DiMondi, Old Post, LLC; Mr. Chad Warren, Davis, Bowen & Friedel; Mr. Sal Leone, Project Manager (virtual), Mr. Freddy Bada, Moonlight Architecture (virtual)

Mrs. Melson-Williams stated that the image on the screen that you see is the proposed concept for the Old Post Project. This is a revised version of that Plan. It’s located at 55 Loockerman Plaza. This project appeared before the Commission earlier this year; however, they have made revisions to their Plan, hence needing to reappear before both the Historic District Commission and the Planning Commission. The property at 55 Loockerman Plaza was previously owned by the City of Dover and is now in the ownership of the Old Post LLC, so some of our information may not have fully been updated in our Reports. The property is zoned C-2 (Central Commercial Zone) and is within the H (Historic District Zone). The property also lies within the SWPOZ (Source Water Protection Overlay Zone) for a portion of the site. That does not limit the proposed uses in any way for this project. Tonight, there are a number of things that you will need to consider as part of the application. First, she wants to talk a little bit about the revisions. The proposed project would demolish the rear warehouse portion of the building, keeping the front portion of what we knew as the Post Office, but with additions of a second floor on what she calls the front wings of the building. Then the building would be expanding with a rear addition of four stories. Previously, the rear addition was proposed at three stories and those second floor wings were not part of the concept. In changing the form of the building, they are increasing the number of apartments from 36 to 42 units. With these revisions to the architecture, it did reappear before the Historic District Commission at their November 20, 2025 Meeting for

2
5

Página 6

CITY OF DOVER PLANNING COMMISSION DECEMBER 15, 2025

Item 1.

consideration of its Architectural Review Certification. There was a separate Report that was provided from the Historic District Commission to Planning Commission. The Planning Commission has that in their packet but in summary, the Historic District Commission considered the proposal and is recommending that the Planning Commission grant approval to the Architectural Review Certification for the project, having reviewed the Design Standards and Guidelines for the City of Dover’s Historic District Zone. The details of their recommendations are found in that separate Report. The next image on the screen shows the colorized version of the Site Plan. She did include that plan on the Commissioner’s desks this evening. It was updated most recently associated with the Active Recreation Area Plan. You can see at the top of the page is Innovation Way, an existing street and that it where we take access to the rear parking lot. The building is shown in the “L” red color. It has a rear parking lot and then a parking lot area on its west side. The main front of the building still faces Loockerman Plaza and that is on the right hand side of this image. There are a couple of different access points into the building for focusing on the apartment aspects of it. This image also shows concepts for where there will be green space on the property including tree planting to meet those requirements and then a sense of some of the Active Recreation components that are required for this project. The Active Recreation Area Plan was revised with this Plan. There is a separate Report from when it was considered by the City Council’s Parks, Recreation and Community Enhancement Committee. But in summary for the 42 apartments, they need to provide a minimum of 75 SF of Active Recreation per dwelling unit with a minimum of 2,500 SF provided on the site. They are meeting the area requirements by providing the following items. Those include two zen garden areas; one is on the east side of the building and you can see that there is a little bit of a meandering path. There is an intention to place benches and a place for a yoga station. Likewise, on the west side of the building, there is another green space area with benches. Interior to the building, there are places for bike storage and then also a gym space that is located on the second floor of the front portion of the building. With the Active Recreation concepts there, the Committee did, as noted, recommend approval. They noted the proximity of this location to amenities that you could walk to such as the Library and the other path systems that are nearby at Silver Lake. There was some notation about planting the right tree in the right locations, especially if there is over head electric lines in the area. But in general, that Committee recommended to accept the Active Recreation Area Report per the Active Recreation Area Report that prepared by Staff which has some additional comments really about clarifying certain aspects of things like surfaces for a walking path in that yoga area and then just more detailing as the Plan moves forward to clearly identify all of those locations. With this property the one other thing you need to consider is the Parking Strategy Statement. In the C-2 (Central Commercial Zone) per our recent changes to that zone, there is no longer a parking requirement based on use. The applicant, in order to make use of that, has to provide a Strategy Statement and they have done so. There is just over 60 spaces located on the property and then with the transfer of ownership, they also negotiated an easement to allow the use of that easternmost row of parking that’s adjacent to their property that’s actually on the parcel where the Library stands. So, that is under easement with the City of Dover to allow this property to utilize those spaces. Then of course, this is in the Downtown so there is a variety of other parking opportunities on- street and otherwise in the overall vicinity. The DAC Report does go on to include the comments from the Planning Office directly about the details for the project. There are additional comments from the other reviewing agencies including the Department of Public Works who will have to be looking at the entrance design from Innovation Way, the Department of Water/Wastewater,

3
6

Página 7

CITY OF DOVER PLANNING COMMISSION DECEMBER 15, 2025

Item 1.

and the Office of the Fire Marshal. There was a copy inserted of DelDOT’s earlier comments regarding this site and then also comments from the Kent Conservation District and the Dover Kent County MPO. With this, it is a Site Plan for consideration and also involves your feelings on the Parking Strategy Statement as it’s been revised, and the Revised Architectural Review Certification which deals with the construction onsite and the building. It also needs to address the parking to building separation reduction that is necessary at the rear of the building. Some of our Codes require that distance to be fifteen (15) feet and they’ve got something around eleven (11) feet at this point in time. Staff is recommending approval of that by finding where it is on the building and that it allows the continued adapted reuse of an existing building in a Historic District. The last component for consideration is their Active Recreation Area Plan.

Mr. DiMondi stated that they are excited about this project. Obviously, it’s been a long time coming for what was going to happen with the old Post Office. He remembers when he used to visit there with his father to get their mail. Some of the other partners have also been in Dover a long time and have had fathers who have had successful businesses in Dover. They did the same thing, so we are kind of excited. When we won the bid, we competed against nine or ten other bidders to get the property and one of the things that we did promise was to try and keep the front of the Post Office looking similar to the way it was when he used to walk in in the 1960’s with his father to get the mail. So he thinks that they have kind of kept that to be quite honest. You are going to walk up to the building and it’s going to look kind of like the old post office but it’s going to have a little bit of a modern touch to it; especially the tower in the back. When you look at it from the side, it will have a much different view but we are pretty excited about the design and how it came out. It’s got 42 apartments and downstairs, they have about 4,500 SF of commercial space that will hopefully be a restaurant or two or maybe a meeting space with some patios out front where you could maybe have some outside dining with some umbrellas to help out not only our residents but also our Legislators or people who want to go across the street to have a meeting or get something to eat. We think we’ve got a pretty good plan. We recognize that it is kind of the gateway; we call it the “new gateway to Dover.” It is going to be the first really big new building that you are going to see as you come in down the boulevard. We take a lot of pride in the project and we look forward to getting started.

Mr. Lewis asked the applicant to speak about how they mentioned keeping the front of the building impacted and the parking spaces available by keeping the esthetic of the front; one of the letters here mentions that. Responding to Mr. Lewis, Mr. DiMondi stated that he doesn’t think the front staying the same has altered the parking to be quite honest. The parking was on the sides on the east and west wings and then the majority of the parking is from the back and side of the building anyways. It had a large parking area where the trucks were coming in to deliver the mail.

Mr. Warren stated that there are 62 parking spots to the rear of the building and the letter was written in regards to the Fire Marshal and that separation distance. It is just keeping the front and original portion of the Post Office there but constructing our apartment building to the rear. We are really tight with space from the rear of the building to the parking so we are proposing to reduce that distance from fifteen (15) feet down to eleven (11) feet. We have spoken with the Fire Marshal and since there is two doors and three windows that just access the stairs of the building, they weren’t too concerned about it. They said their access to the building would be

4
7

Página 8

CITY OF DOVER PLANNING COMMISSION DECEMBER 15, 2025

Item 1.

from the sides; either from Innovation Way or from the parking spaces to the west side of the building. So, the Fire Marshal didn’t see any issue with it that we are aware of.

Mrs. Melson-Williams stated that going forward a few slides shows a clearer version of the parking spaces. The row of parking that’s there that is where you see the shading for the handicapped spaces is the row we are talking about and its distance to the building. Between that parking and the building, there is a sidewalk and then the steps or the ramp system to get to that door.

Mr. Lewis stated that the reason he brought it up was because it was one the list of things of restrictions that you guys were doing that impacted the parking and he was curious about how something in the front would impact the back.

Mr. Witham asked if there was one major reason or a series of reasons which required you to revise your plans. Responding to Mr. Witham, Mr. DiMondi stated that they had a change in ownership of the LLC which allowed us to kind of go back and look at the original design. One of the things that they are running into was the expense of the project and what we were able to squeeze out of it when it came to apartment sizes and how many apartments we got. So, we kind of went back to the drawing board and decided if they could go up on the wings on the front of the building and pick up some extra apartments which is exactly what we did. Then it became a parking issue if we went up another floor from three to four stories to still get enough parking. Based on what we did, we sort of maximized the site and now we can’t fit anything more on there even if we wanted to.

Dr. Jones asked who they plan to market your apartments. Responding to Dr. Jones, Mr. DiMondi stated that they will be priced at market rate.

Dr. Jones stated that they are trying to attract what kind of population. Responding to Dr. Jones, Mr. DiMondi stated that obviously our goal is to support the employment in Downtown Dover. You’ve got the Courthouse, the Hospital expanding so you may get nurses or doctors. During the DAC Meeting, we heard the Dover Air Force Base get excited saying they would like to have some apartments in Downtown Dover. So maybe some military members would like to live there.

Dr. Jones stated that the restaurant that you are hoping to have; what kind of restaurant? Responding to Dr. Jones, Mr. DiMondi stated it would not be fast food. Obviously, he can’t talk too much about it. We have had some conversations but we are kind of a ways off. If we are gracious enough to get your approval tonight, we will maybe start demolition in the late winter or early spring. It’s going to take us about a year to build so we are quite a ways out before we can really get into any kind of negotiations but to answer your question, it would be nice to get a breakfast spot or somewhere that serves breakfast and lunch or maybe a coffee shop of some sort or something like that.

Dr. Jones asked if their Active Recreation Area Plan, will it include anything for children or are you certain that there will be no children in the apartments. Responding to Dr. Jones, Mr. DiMondi stated that is a good question because when we changed our design up, we went away

5
8

Página 9

CITY OF DOVER PLANNING COMMISSION DECEMBER 15, 2025

Item 1.

from a bunch of studios and increased it so that we have some two and three bedroom apartments so we do expect that we will get some families in this building. He would have to go back and look at that because that is a great question. Maybe in the gym we can offer something for the kids. He knows that outside there is a little zen garden on the right and they’ve got benches and stuff out there, but from a recreational standpoint we would have to go back and check that out.

Dr. Jones stated that she would like to see that because with the attraction of perhaps a small family, you would need something.

Mr. Witham stated that he was wondering how they were going to make the adjustment to change the slope on the ramp. How is that going to be configured? Responding to Mr. Witham, Mr. Warren stated that the previous design included some stairs from a large hallway to get into the gym which they had plenty of room and they were able to expand those stairs into a ramp to accommodate access that way.

Mr. Witham asked if there won’t be any stairs or is the ramp in addition to the stairs? Responding to Mr. Witham, Mr. Warren stated that it will be mainly a ramp. It will be only a ramp.

Mr. Witham opened a public hearing.

Mr. Zach Prebula – Kent Economic Partnership 555 Bay Road Dover, DE 19901 Mr. Prebula stated that they are the economic development organization for Kent County and we focus on business attraction and also supporting businesses looking to expand. This project would be a great addition to Downtown as it adds commercial space to help attract businesses while also providing additional housing opportunities for residents. And we ask the Commission to please support this project.

Mr. Freddie Bada – Moonlight Architecture Mr. Bada stated that they are the project architects and they have taken a lot of efforts to try and enhance the look of the building to compliment the Downtown architecture, yet keep the historic aspect of the building. So even though we are tearing off parts of the sides of the building and going up another story, we have tried to keep that historic look at not alter from the Loockerman Street perspective.

Mr. Witham closed the public hearing.

Mrs. Melson-Williams stated that this is noted as a Revised Site Development Plan. For your consideration is their Parking Strategy Statement as revised, the revised Architectural Review Certification including the request to allow that parking to building separation reduction distance. The Architectural Review Certification was recommended by the Historic District Commission subject to that Report and its conditions and then you also have the Revised Active Recreation Area Plan, again as recommended by the Parks and Rec Committee and forwarded to you.

Mrs. Denney moved to approve S-25-07 which would also include the Parking Strategy

6
9

Página 10

CITY OF DOVER PLANNING COMMISSION DECEMBER 15, 2025

Item 1.

Statement as well as the Active Recreation Area Plan. She thinks this is very well thought out and she is sure this was an extra expense to have the brick side and all but, she thinks that this building as we are seeing it just really lends itself to the area, the architecture and the historic aspect of the City of Dover; the Capital City of the State that started the Nation.

Mr. Witham asked Mrs. Denney to clarify in the motion if she approves the revised Architectural Review Certification as well.

Mrs. Denney moved to approve S-25-07 which would also include the Parking Strategy Statement as well as the Active Recreation Area Plan. She thinks this is very well thoughtout and she is sure this was an extra expense to have the brick side and all but, she thinks that this building as we are seeing it just really lends itself to the area, the architecture and the historic aspect of the City of Dover; the Capital City of the State that started the Nation and also including the Architectural Review Certification. The motion was seconded by Mrs. Welsh and the motion was carried 9-0 by roll call vote. Mrs. Denney voting yes; in keeping with her motion. She thinks this is a lovely addition and change and it somewhat saves at least the front façade of the Post Office. Mrs. Maucher voting yes; based on DAC comments. Mr. Baldwin voting yes; it will be a great addition. Dr. Jones voting yes; it seems like it’s going to be an exciting project and she hopes there will be consideration for the inclusion of children in the active recreation area. Mr. Reaves voting yes; for reasons previously stated. Mrs. Welsh voting yes; for reasons previously stated. Mr. Lewis voting yes. Mr. Roach voting yes. Mr. Witham voting yes; it’s an excellent use of a valuable resource in Dover and as the applicant stated, it opens the gateway to the Downtown Area which he thinks is going to be very helpful. He would love to see a flagpole; he doesn’t know whether or not that is in the plans.

NEW BUSINESS

No items of New Business.

PUBLIC COMMENTS OPPORTUNITY

No members of the public spoke.

Meeting adjourned at 7:54 PM.

Sincerely,

Kristen Mullaney
Secretary

7
10

Página 11

Item 2. City of Dover, Delaware APPLICATIONS TO PLANNING COMMISSION FOR CONDITIONAL USES, SITE PLANS, SUBDIVISION, & REZONING Schedule of APPLICATION DEADLINES, DEVELOPMENT ADVISORY COMMITTEE Meeting dates, PLANNING COMMISSION Meeting dates, and CITY COUNCIL PUBLIC HEARING dates for 2026 filing deadlines. A Pre-Application Meeting must be conducted with Planning Staff prior to filing of an Application. The submittal procedures are outlined in Zoning Ordinance, Article 10 Sections 1, 2, 3, 4 and 5.

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Application 1/2/26 2/6/26 3/6/26 4/2/26 5/1/26 6/5/26 7/2/26 8/7/26 9/4/26 10/2/26 11/6/26 12/4/26 Deadline Revised Rezoning by 4:00pm 1/5/26 11/20/26 CITY COUNCIL 1/26/26 2/23/26 3/23/26 4/27/26 5/11/26 6/22/26 7/78/26 8/24/26 9/28/26 10/26/26 11/23/26 12/14/26 Rezoning Ordinance First Reading D.A.C. 1/28/26 2/25/26 4/1/26 4/29/26 5/27/26 7/1/26 7/29/26 9/2/26 9/30/26 10/28/26 12/2/26 12/30/26 MEETING (STAFF ONLY) D.A.C. 2/4/26 3/4/26 4/8/26 5/6/26 6/3/26 7/8/26 8/5/26 9/9/26 10/7/26 11/4/26 12/9/26 1/6/27 MEETING (APPLICANT) PLANNING 2/17/26 3/16/26 4/20/26 5/18/26 6/15/26 7/20/26 8/17/26 9/21/26 10/19/26 11/16/26 12/21/26 1/19/27 COMMISSION Public Hearings, Rezoning Recommendation CITY COUNCIL 3/9/26 4/13/26 5/11/26 6/8/26 7/13/26 8/10/26 9/14/26 10/12/26 11/9/26 12/14/26 1/11/27 2/8/27 Action on Rezonings: Consideration of PC Recommendation and Public Hearing/Final Reading – Rezoning Ordinance

***Planning Staff will advise applicants as to the Committee Meetings schedule if applicable to the Application submission. FINAL 12.23.2025

For Information Contact:

City of Dover Department of Planning & Inspections, City Hall, 15 Loockerman Plaza P.O. Box 475, Dover DE 19903 (302)736-7196 Phone (302)736-4217 Fax www.cityofdover.gov compplan@dover.de.us 11

Página 12

Item 3.

City of Dover
DATA SHEET FOR SITE DEVELOPMENT MASTER PLAN REVIEW

DEVELOPMENT ADVISORY COMMITTEE MEETING OF January 7, 2026

PLANNING COMMISSION MEETING OF January 20, 2026

Plan Title: Bayhealth Medical Center, Inc. – Kent Campus: Master Plan Phases 1-3. S-26-01

Plan Type: Site Development Master Plan and Parcel Consolidation Plan Associated Plans: V-25-05 Variance for Building Height and Front Yard Setback

Property Location: Located in the block created by South State Street, Hope Street, South Governors Avenue, and South Street with additional project area located on the north side of South Street.

Property Address: 640 South State Street and others

Tax Parcels: ED-05-077.13-01-52.00-000, ED-05-077.13-01-48.00-000, ED-05-077.13- 01-18.00-000, ED-05-077.13-01-18.01-000, ED-05-077.13-02-01.00-000, ED-05-077.13-01-02.00-000, and ED-05-077.13-02-12.00-000

Owner: Bayhealth Medical Center, Inc.

Present Zoning: IO (Institutional and Office Zone) SWPOZ (Source Water Protection Overlay Zone): Tier 3 – Excellent Recharge Area

Site Area: Main Campus: 13.13 acres +/- Total Area: 22.55 acres +/- (includes Hope Street and South Street Parking Lots)

Existing Uses: Existing Buildings as Hospital, Parking Garage, Office Buildings, and Central Services Building with Surface Parking Lots Proposed Uses: Hospital with Building Additions, New Parking Garage, Office Buildings, and Central Services Building with Surface Parking Lots

Master Plan Phases: Phase 1A – Emergency Department 2-story Expansion (Overbuild) and Central Services Building 6,000 SF Addition Phase 1B - Bed Tower 6-story Overbuild Phase 2A – New 5-story Parking Garage (500 spaces) and Main Entry Addition with Drop-off Area Phase 2B – Demolition of Existing Parking Garage and a Podium Expansion as 3-story Surgical Pavilion Phase 2C - Emergency Department 3-story Expansion Phase 3 - Demolition of Existing Legacy Building.

Waiver Request: Reduction of Bicycle Parking Requirement For Consideration: Parking Adequacy Statement/ Reduction of Parking Requirement

  • P.O. Box 475 Dover, DE 19903 12 Community Excellence Through Quality Service

Página 13

City of Item 3.
Dover
Planning
CITY OF DOVER Office

DEVELOPMENT ADVISORY COMMITTEE

APPLICATION REVIEW COMMENTARY

D.A.C. MEETING DATE: January 7, 2025

APPLICATION: Bayhealth Medical Center, Inc. Kent Campus: Master Plan Phases 1-3

FILE #: S-26-01 REVIEWING AGENCY: City of Dover Planning

CONTACT PERSON: Dawn Melson-Williams, AICP PHONE #: (302) 736-7196

  • I.PLAN SUMMARY

The Application for Review is the Site Development Master Plan and Parcel Consolidation Plan for the Bayhealth Medical Center – Kent Campus. The Master Plan outlines three (3) phases (with subphases) of construction as follows: Phase 1A – Emergency Department 2-story Expansion (Overbuild) and Central Services Building 6,000 SF Addition; Phase 1B - Bed Tower 6-story Overbuild; Phase 2A – New 5-story Parking Garage (500 spaces) and Main Entry Addition with Drop-off Area; Phase 2B – Demolition of Existing Parking Garage and a Podium Expansion as 3- story Surgical Pavilion; Phase 2C - Emergency Department 3-story Expansion; and Phase 3 - Demolition of Existing Legacy Building. The properties involved consist of a total land area of 22.55 acres ±. The properties are zoned IO (Institutional and Office Zone) and partially subject to the SWPOZ (Source Water Protection Overlay Zone). The project is generally located in the block created by South State Street, Hope Street, South Governors Avenue, and South Street with additional project area located on the north side of South Street. The main property address is 640 South State Street. The owner of record is Bayhealth Medical Center Inc. Tax Parcels: ED-05- 077.13-01-52.00-000, ED-05-077.13-01-48.00-000, ED-05-077.13-01-18.00-000, ED-05-077.13- 01-18.01-000, ED-05-077.13-02-01.00-000, ED-05-077.13-01-02.00-000, and ED-05-077.13-02- 12.00-000. Council District 2.

Associated Applications: The Board of Adjustment on October 15, 2025 granted approval of variances for the front yard setback and to allow a building height of 175 feet (V-25-05). These variances are related to the Phase 1B – Bed Tower 6-story Overbuild on the existing four-story Podium Building.

Also in 2025, the property at 600 South State Street was approved for Rezoning from RG-O to IO remaining partially subject to the SWPOZ (Source Water Protection Overlay Zone). The property currently includes a two-story brick building originally built as a residence and later converted to offices upon purchase by Bayhealth. This area at the corner of South State Street and South Street will be consolidated into the main hospital parcel and in proposed for redevelopment in Phase 2A – New Parking Garage.

13

Página 14

Item 3. S-26-01 Bayhealth Medical Center Inc. – Kent Campus: Master Plan Phase 1-3 DAC Report of January 7, 2026

Previous Applications: Master Plan S-20-10 Scull Mansion Staff Parking Lot: This Bayhealth Staff Parking Lot Expansion on the east side of S. State Street in the block between South Street and Scull Terrace was to expand an existing parking from 227 spaces to a total of 680 parking spaces on the area collectively known as the Scull Property. Approved by the Planning Commission in 2021, only Phase 1 of the project was completed involving the construction of approximately 290 parking spaces and the demolition of the Scull Mansion (constructed circa 1864 by Manlove Hayes as a residence then utilized as offices by Bayhealth). Phase 2 and Phase 3 involving area near the Surgery Center and Day Care Center with additional building demolitions for new parking spaces and a connection to S. State Street at the South Street intersection were not completed. Property Addresses: 605 S. State Street, 625 S. State Street, 100 Scull Terrace, and 150 Scull Terrace. Tax Parcel Numbers: ED-05-077.13-01-49.00- 000 and ED-05-077.13-01-51.00-000.

Site Plan S-13-05 Lands of KGH Development Corp. Previously the Scull property site was the subject of Site Plan S-13-05 Lands of KGH Development Corp. at 625 S. State Street: Parking Lot Construction in 2013. In May 2013, the Planning Commission granted conditional approval of the Site Plan S-13-05 for the expansion of the existing parking lot to add one hundred-thirty (130) parking spaces subject to conditions. The action included approval of a Curbing Waiver and also added conditions to require elimination of certain parallel parking spaces along the Scull Terrace entrance drive.

Also, with Site Plan S-13-05, the Planning Commission approved the use of the Joint Parking Facilities provisions of Zoning Ordinance, Article 6 §3.7. This allowed the parking to be viewed on a facility-wide approach for the Bayhealth Medical Center properties where the parking lots may serve two or more establishments that are not located on the same parcel. The Commission accepted the information on employee count (for the parking calculation) and the Parking Exhibit Plan giving information existing parking facilities (as of 2013). The new spaces of the parking lot expansion developed under S-13-05 contributed toward the overall parking requirements for the Bayhealth Medical Center facilities.

Master Plan S-06-14 Bayhealth Medical Center: A Master Plan was previously developed for the main campus area of the Bayhealth Medical Center at 640 South State Street. The project area for the Bayhealth Medical Center Master Plan consisted of multiple parcels of land located between South State Street and South Governors Avenue in the vicinity of South Street and Hope Street. The entire campus was involved in the Unified Comprehensive Signage Plan for the Bayhealth Medical Center facilities (US-11-01).

The Bayhealth Medical Center Kent Campus Master Plan (S-06-14) was approved in June 2006 with a one-year extension to the project in May 2007. Revisions to the Master Plan approved in September 2007 related to a Pedestrian & Utility Bridge over South Street rather than a tunnel as first proposed. The four phases of the Master Plan S-06-14 consisted of the following: • Phase 1: Central Services Building • Phase 2: Podium Building, Parking Garage, and Pedestrian & Utility Bridge • Phase 3: South Street Parking Lot improvements • Phase 4: Seven-story Bed Tower Building Addition and north Parking Garage After some revisions to the construction sequencing, the following phases have been completed:

14

Página 15

Item 3. S-26-01 Bayhealth Medical Center Inc. – Kent Campus: Master Plan Phase 1-3 DAC Report of January 7, 2026

S-08-20 Phase 1- Podium Building and Parking Garage and S-08-42 Phase 2A – Central Services Building and Pedestrian & Utility Bridge. Administrative Site Plan review was completed in August 2009 for S-09-02 Phase 2B – South Street Parking Lot Improvements but not started. A proposed north Parking Garage (in Phase 4) was not built.

II. PROJECT DESCRIPTION

This Site Development Master Plan proposes three (3) phases (with subphases) of the project for the Bayhealth Medical Center – Kent Campus. The total subject area consists of 22.55 acres when the Hope Street Parking Lot and the South Street Parking Lot are added to the main campus block of 13.13 acres. Overall, the project involves the following: • Phase 1A – Emergency Department 2-story Expansion (Overbuild) and Central Services Building 6,000 SF Addition • Phase 1B - Bed Tower 6-story Overbuild • Phase 2A – New 5-story Parking Garage (500 spaces) and Main Entry Addition with Drop-off Area • Phase 2B – Demolition of Existing Parking Garage and a Podium Expansion as 3-story Surgical Pavilion • Phase 2C - Emergency Department 3-story Expansion • Phase 3 - Demolition of Existing Legacy Building

In general, the application proposes construction of building additions as ‘overbuilds’ on top of existing building footprint of the main hospital building. A key component is the creation of patient rooms with one bed with the goal of transitioning from the existing dual occupancy rooms to single bed rooms and also additional beds. This will change the overall bed count from 266 beds to 360 beds. A new Parking Garage Building is proposed along South State Street to replace the existing Garage Building whose footprint will be an expansion of the existing Podium Building. The final phase involves the demolition of a large portion of the southern part of the hospital building once its functions are relocated into new spaces.

Surrounding Land Uses The parcels surrounding the Bayhealth Medical Center Kent Campus main block are zoned a mix of institutional and residential: IO (Institutional and Office Zone), and R-8 (One Family Residence Zone). The property to the north across South Street is the location of the large surface parking lot (South Street Parking Lot) for the Hospital and another multi-story professional office building zoned IO. The City’s Historic District Zone involves portion of the South Street Parking Lot and other (non-hospital) properties fronting on South State Street continuing north towards The Green and beyond; the main block of the Bayhealth Medical Center campus is not within the Historic District. To the northeast of the hospital area, there are several single-family detached residences facing South State Street and then more residential buildings along Elm Terrance. Also zoned IO across South State Street is another parking lot, day surgery building, and child day care associated with the Hospital along Scull Terrace and the Holy Cross Church and School property. To the west across South Governors Avenue and property zoned C-3 and IO with automobile dealership and multiple office buildings including some occupied by Bayhealth facilities.

15

Página 16

Item 3. S-26-01 Bayhealth Medical Center Inc. – Kent Campus: Master Plan Phase 1-3 DAC Report of January 7, 2026

III. ZONING REVIEW

IO Zoning District The subject properties are zoned IO (Institutional and Office Zone) and subject to the regulations of Zoning Ordinance, Article 3 Section 10 and Article 4 Section 4.15. The use as a hospital is an allowable use in the IO zone.

SWPOZ (Source Water Protection Overlay Zone) Portions of the site along South Street and to the north are located within the SWPOZ (Tier 3: Excellent Recharge Area) found in Article 3 Section 29.7 of the Zoning Ordinance. However, this project site is within the Downtown Redevelopment Target Area which is exempted from the SWPOZ requirements and restrictions as per Zoning Ordinance, Article 3 §29.79 for the Tier 3 area as related to impervious surface requirements.

Site Development Master Plan The plan for this project is submitted for review under the Site Development Master Plan process (See Zoning Ordinance, Article 10 §2.44 listed below). This process allows for a series of construction phases to be outlined in a Master Plan for Planning Commission review and approval. Prior to each Phase of construction, a Site Plan specific to that phase is submitted for Administrative Site Plan review.

Article 10 §2.44 Site development master plans. Conceptual site development master plans shall be reviewed by the planning commission in accordance with the provisions of subsection 2.43. Conceptual site development master plans shall depict a site development proposal that reflects general compliance with the provisions of the zoning ordinance and shall also reflect the following information on the plan:

(A) Conceptual Master Plan. Conceptual Master Plan shall include the proposed general layout of building, streets, parking, open space, landscape concepts, and stormwater management areas. (1) Detailed site construction plans, details, and specifications are not required as part of a site development master plan submission. (2) The plan shall illustrate distinct phase boundaries for each proposed construction phase and shall depict proposed construction and site improvements planned for each phase. Bulk quantities and area totals for each construction phase, and for the total site, shall be tabulated in a data column on the plan. (3) Each construction phase shall be enumerated in sequential order on the site development master plan according to the order of construction contemplated by the plan. Phases shall be implemented in accordance with the approved site development master plan unless the city planner approves an alternate phasing. (4) Each construction phase represented on the master plan shall be planned and designed to function independent of construction and site improvements contemplated in future construction phases in all respects, including but not limited to bulk area provisions of the zoning district in which the site is located, off-street parking requirements, site entrances, emergency access requirements, site utilities, and stormwater management improvements except where the requirements and needs of a later phase are met and remain met by a previous phase of completed construction. (5) Any special agreements or conditions of approval relative to the overall development that have been specified by regulatory agencies shall be documented on the site development master plan. (B) Phased site plan approval. Individual phased components of the Conceptual Master Plan are to be reviewed and approved as an Administrative Site Plan. Final site

16

Página 17

Item 3. S-26-01 Bayhealth Medical Center Inc. – Kent Campus: Master Plan Phase 1-3 DAC Report of January 7, 2026

construction plans, including detailed site grading, paving, utilities, stormwater management, and tree planting and preservation plans shall be submitted for final approval by the city planner and/or authorized designee, and to other agencies having jurisdiction, on a phase by phase basis in accordance with the approved site development master plan, and all regulations of the City of Dover governing the approval of site plans as set forth in subsection 2.4 and 2.5.

IV. PARKING SUMMARY

The parking requirement for a property in the IO zone is one parking space per 300 S.F. of floor area. Previously the IO zone included a parking rate based on employee count but this was removed. It is noted that the minimum off street parking requirement for the hospital use is based on one (1) space per every three (3) beds in the facility (Zoning Ordinance, Article 6 § 3.1).

Bayhealth Medical Center Campus Parking Summary: The applicant listed on the Plan a summary of the overall parking provided for the Bayhealth Medical Center properties on the main campus and the nearby parking lots at the Hope Street Parking Lot and the South Street Parking Lot. The plan lists an existing total of 1,575 parking spaces available for the campus and after all phases a total of 1,704 parking spaces. See Parking Data Summary – Bayhealth Medical Center Campus Chart on Plan Sheet C-001.

This Master Plan on the Bayhealth Medical Center campus includes construction of a new parking garage (replacing the existing parking garage), changes to certain areas of surface parking lots for improvements to existing parking lots. The Master Plan identified the locations of the campus buildings and associated parking facilities. The following table is provided as reference for the various locations

Parking Facilities at Bayhealth Medical Center Campus (from S-26-01 Plan) Location Address/Location Number of Parking Spaces Bayhealth Hospital (main 640 South State Street 150 spaces in Staff designated lots and near building/block) and (600 South State Street and Emergency Department. 622 South State Street) 371 spaces in Existing Parking Garage to be replaced with 500 spaces proposed in New Parking Garage

South Street Parking LotNorth side of South Street462 spaces
Additional spaces are also available at the
Central Services Building and 51 spaces its
North Parking Lot.
Hope Street Parking LotSoutheast corner of Hope Street168 spaces
and South Governors Avenue
Scull Parking Lot605/625 South State Street433 total spaces including the 36 spaces
required for the Surgery Center Building and
32 spaces for the Child Day Care Center
Facility Building.
365 spaces available for Campus Use

17

Página 18

Item 3. S-26-01 Bayhealth Medical Center Inc. – Kent Campus: Master Plan Phase 1-3 DAC Report of January 7, 2026

Parking Compliance/Allowance for Parking Reduction: The Zoning Ordinance allows for new construction in the Downtown Redevelopment Target Area so that there is no parking requirement based on use. Thus, for the hospital there is no requirement based on the bed count, instead the parking requirement would be based on the floor area calculation. The Zoning Ordinance includes provisions for consideration of parking to jointly serve multiple establishments and campus approaches to parking.

The Zoning Ordinance allows for adjustments to parking requirements. For the Bayhealth Hospital main campus, a 20% reduction is granted for the property’s location in the Downtown Redevelopment Target Area. Based on the total square footage of 623,340 SF, the parking requirement is 2,078 spaces. With the reduction of 20% would mean the requirement is 1,663 parking spaces. With the proposed Parking Garage of 500 spaces and 1,204 surface parking spaces, the campus can provide 1,704 parking spaces.

Additionally, the applicant submitted narrative titled “Synthesized Parking Adequacy Statement” describes the parking needs of the Bayhealth Kent Campus; see submission.

Loading Spaces Institutional buildings require loading spaces at rate of one space per 10,000 SF and one space per each additional 25,000 SF. The Zoning Ordinance can only require a maximum of 3 loading spaces for buildings up to 150,000 SF in size. The campus provided more than 3 loading spaces with the Central Services Building where centralized materials receiving and handling occurs.

Bicycle Parking Waiver Request: Reduction of Bicycle Parking Requirement The project is required to provide bicycle parking. The bicycle parking calculation is one for every twenty parking spaces. Each phase would be required to satisfy the bicycle parking coinciding with the number of vehicle parking spaces. Existing bicycle parking space’s locations were not identified. A written Waiver Request was received to reduce the required bicycle parking from 85 spaces to the current 38 bicycle parking spaces. The Planning Commission will consider this request. With Master Plan S-20-10, a Waiver Request was granted to relocate the required bicycle parking from that Parking Lot Expansion project on the Scull property to the Bayhealth main campus at 640 S. State Street citing it as the destination of bicycle riders.

Upright Curbing The upright curbing for parking lots and drive aisles is required per the requirements of Article 6 Section 3.6(b) of the Zoning Ordinance. This curb type appears to be utilized throughout the parking lot construction area. The City Planner can consider requests to eliminate curbing when there is a demonstrated need related to stormwater management. This will be reviewed during the Administrative Site Plan process.

  • V.SITE CONSIDERATIONS

Access The property is accessed by an entrance drive from each street frontage of the main campus block.

18

Página 19

Item 3. S-26-01 Bayhealth Medical Center Inc. – Kent Campus: Master Plan Phase 1-3 DAC Report of January 7, 2026

Sidewalks The project site of the main campus has an existing sidewalk along the street frontages with sidewalk connections onto the site. A pedestrian crosswalk system (pedestrian activated warning lights system) exists for the crosswalk across South State Street to the other parking lot off Scull Terrace.

Lighting Any proposed lighting must be adequate to safely light all parking and pedestrian areas yet must be shielded and directed as to not create a nuisance on the adjacent properties.

VI. TREE PLANTING AND LANDSCAPE PLAN

The submitted plan includes the Landscaping approach for the overall project. Zoning Ordinance, Article 5, Section 16.62 offers the option of the applicant defining a “Development Area” within the overall property for the purpose of tree planting calculations. The applicant has established a “Development Area” for the project s shown on the Landscape Plan (Sheet L-101) as a dashed black line.

With the tree planting requirement of one tree per 3,000 SF of Development Area, the Development Area is estimated to require x new trees. Some existing trees along South State Street will remain. The Landscape Plan is providing a mixture of trees to provide a total of 122 new trees on the site. Mixed Planting of canopy trees, flowering trees, and evergreen trees are proposed.

VII. CITY AND STATE CODE REQUIREMENTS:

The subject proposal has been reviewed for Code compliance, plan conformity, and completeness in accordance with this agency’s authority and area of expertise. The following items have been identified as elements which need to be addressed by the applicant:

  • 1)The Master Plan must reflect any changes recommended by the Planning Commission. Add notes for any waivers or conditions acted upon by the Planning Commission.
  • 2)Upright curbing shall be provided in accordance with the Zoning Ordinance. A waiver may be granted by the City Planner if necessary, for stormwater management. Specific area requests may also be identified with the Administrative Site Plan submissions for future phases.
  • 3)Bicycle parking must be provided unless a waiver for its relocation or reduction is granted by the Planning Commission. A Waiver Request to reduce this requirement was received for review. The Administrative Site Plan must include details of the improvements to the bicycle parking locations.
  • 4)This application needs to comply with parking provisions of Zoning Ordinance, Article 6 for the Bayhealth Medical Center campus. It qualifies for a parking reduction based on its location in the Downtown Redevelopment Target Area. A narrative titled “Synthesized Parking Adequacy Statement” provides information on the required parking for the hospital facilities and the existing parking conditions on the campus was provided.

19

Página 20

Item 3. S-26-01 Bayhealth Medical Center Inc. – Kent Campus: Master Plan Phase 1-3 DAC Report of January 7, 2026

  • 5)A separate Record Plan sheet will be necessary to show parcel consolidations, all right-of- way dedications, any easements, or other items affecting the property lines.
  • 6)Sheet C-001:
  • a)List all involved addresses.
  • b)Remove reference to parking rate based on employee count as this is not park of the code.
  • c)Add date of variance approvals.
  • d)Item #8; Check listing labels of Phases.
  • 7)Ensure accessibility ramps provided at intersections of sidewalks with parking and drive aisles.
  • 8)Sheet C-101 – Existing Conditions Plan:
  • a)Check parking tally.
  • 9)Sheets C-201 Series: The following items are noted for correction or addition and should be provided on future Administrative Site Plan submissions.
  • a)Add accessibility ramps to sidewalk crossing points
  • b)Show bicycle parking
  • c)Add addresses to building drawing labels to help clarify locations.
  • d)Identify the location of any traffic control signage for the parking lots and handicapped parking signage.
  • e)Remove curb cuts not utilized along South State Street.
  • f)Consider locations for additional pathway connections from street frontage sidewalk to main building entrance from South State Street.
  • g)Confirm number of parking spaces in each parking lot. Check the parking counts in the South Street Parking Lot and those spaces displaced by Phase 1A addition to Central Services Building.
  • h)Show location of existing Dumpsters that serve the remaining buildings on property in each Phase. Construction of Dumpster enclosures or other screening mechanisms may be required unless centralized services are available.
  • 10)The Administrative Site Plans will need to show the location of existing utilities (water, sewer, stormwater, etc.) to remain. This information will be necessary to determine conflicts with proposed tree planting locations and other site improvements.
  • 11)Construction details for items such as curbing, parking bumpers, traffic control signage, light fixtures, etc. will need to be provided as part of Administrative Site Plan submissions.
  • 12)The following information must be provided on future submissions as related to Landscape Plan in accordance with the plan requirements as listed in Zoning Ordinance, Article 5 §16.8:
  • a)Information and tree planting calculations will need to be made by Phase.
  • b)Provide list of existing trees to remain and check number of existing trees to be retained. Trees must be located on the subject parcels to be counted.
  • c)Add line legend key for Development Area line or label as Development Area (rather than Landscape Project Area).
  • d)Ensure tree planting locations and landscaping maintain the required spacing distances or access provisions from utility lines, fire hydrants, etc.

20

Página 21

Item 3. S-26-01 Bayhealth Medical Center Inc. – Kent Campus: Master Plan Phase 1-3 DAC Report of January 7, 2026

  • e)Identify which existing trees will be removed versus preserved by showing placement location of the tree protection measures. Clarify on a plan drawing like the Existing Conditions Plan/ Demolition Plan.
  • f)Clarify what surface (grass, stone or mulch) will be utilized for areas.
  • 13)Evaluate any existing pavement conditions to remain. Improvements may be necessary to paving, parking bumpers, and curbing and pavement markings.
  • 14)All signage must comply with Sign Regulations of the Zoning Ordinance and is subject to a separate Sign Permit Application. Signs are subject to a separate review and approval process in the City of Dover.
  • 15)Any Erosion & Sediment Control Plans and Stormwater Management Plans granted approval by Kent Conservation District must reflect the Master Plan layout and design conditionally approved by the Planning Commission and be in compliance with the Zoning Ordinance and technical review requirements of other agencies.
  • 16)The Final Plan set and individual administrative site plans must include notes documenting any action taken by the Planning Commission on the requested waivers and must list any additional conditions of approval.
  • 17)The building architecture must be submitted for review by the Planning Commission as part of the Administrative Site Plan review process.
  • 18)This overall site appears to be eligible for consideration of a Unified Comprehensive Signage Plan; this would update the previous Plan from 2011. That is a separate application to the Planning Commission.

VIII. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES:

In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in considering and acting upon Site Development Plans may prescribe appropriate conditions and safeguards so that the public health, safety, and welfare, the comfort and convenience of the public in general, and the residents of the immediate neighborhood in particular shall be taken into consideration. These safeguards may to the maximum extent possible further the expressed intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed in subsections 2.21 to 2.28.

  • 1)Waiver Request:
  • a.Bicycle Parking: Staff recommends approval of the reduction in the bicycle parking requirements to the number currently provided for the hospital campus. Opportunities should be provided for covered parking, such as space within the Parking Garage or otherwise. Location should be identified in the Administrative Site Plan submissions for each phase.
  • 2)Vehicular and Pedestrian Connections: In accordance with Zoning Ordinance, Article 10 21

Página 22

Item 3. S-26-01 Bayhealth Medical Center Inc. – Kent Campus: Master Plan Phase 1-3 DAC Report of January 7, 2026

subsection 2.21 related to safety and convenience of vehicular, transit, bicycle, and pedestrian traffic, Staff recommends the following related to vehicular and pedestrian access: a. Staff specifically recommends that the Analysis address the impact of increased volumes of vehicles utilizing the existing (and proposed) entrances, considering shift patterns and timing, background traffic volumes on South State Street, pedestrian crossings, adjacent uses, and potential stacking of turning vehicles entering and exiting the site at each phase of completion. b. The project should ensure it includes the required accessibility routes and ramps from the parking lots and garage parking around and connecting to the main campus. Appropriate pedestrian connections to other hospital facilities not located on the subject site are a key element under the provisions of the use of campuswide parking facilities.

  • 3)Stormwater Management: The plan provides limited information on the strategy for stormwater management. There are known drainage issues in the general vicinity related to the Meeting House Branch (Tar Ditch). This project must not increase the drainage issues. It is recommended that cooperative participation occur and/or improvements be made to help resolving drainage issues. The City is involved in designing and implementing a Meeting House Branch Drainage/Stormwater Management Improvement Project involving the north area of this property.
  • 4)Electric Vehicle Charging Stations: In the individual Administrative Site Plans, please identify if the project is planning for the installation of Electric Vehicle Charging Stations in any parking lots or parking garage areas. Currently, the Zoning Ordinance does not require them, but many other jurisdictions have implemented such requirements. Electric Vehicle Charging Stations formats include EV-Capable, EV-Ready, and EV-Installed.

Other agencies may recommend additional conditions and safeguards in accordance with their areas of expertise. The Recommended Additional Considerations to Meet Code Objectives may be accepted or rejected by the Planning Commission.

IX. ADVISORY COMMENTS TO THE APPLICANT:

  • 1)The Planning Commission should act upon any requests for waivers as part of any motion regarding this project application, or as a separate motion as necessary. Note: All waivers are at the discretion of the Planning Commission.
  • 2)Demolition of Buildings: With the proposed demolition of the two buildings (Frear Building and Bryan Building), then an evaluation to determine adequate recordation/documentation is recommended to gather information on any potential historic resources (these buildings are over fifty years old). Documentation of the building could include basic cultural resource survey forms, photographs (exterior and interior), drawings, and information on the building’s construction in accordance with the Secretary of the Interior Standards and guidelines published by the State Historic Preservation Office for “Architectural Surveys in Delaware.”
  • 3)If major changes and revisions to the Site Master Plan occur in the finalization of the Plan, contact the Planning Office. Examples include reconfiguration of parking lots, relocation of

22

Página 23

Item 3. S-26-01 Bayhealth Medical Center Inc. – Kent Campus: Master Plan Phase 1-3 DAC Report of January 7, 2026

site components like stormwater management areas, and changes in demolition plans. These changes may require resubmittal for review by the Development Advisory Committee, Planning Commission, or other agencies and commissions making recommendations in regard to the plan.

  • 4)Following Planning Commission approval of the Site Development Master Plan, each phase of the Master Plan is subject to Administrative Site Plan review and approval. The Administrative Site Plans must be revised to meet all conditions of approval from the Development Advisory Committee or as otherwise noted.
  • 5)Construction will have an effect on the visitors to the site, adjacent property owners and nearby streets and site access. Any work requiring the closing or rerouting of owners or visitors shall be minimized and coordinated with the Planning Office and other City Staff as to offer the least amount of inconvenience.
  • 6)The applicant/developer shall be aware that prior to any ground disturbing activities on the site the appropriate site inspections and permits are required.
  • 7)Other agencies and departments which participate in the Development Advisory Committee may provide additional comments related to their areas of expertise and code requirements.
  • 8)The applicant should be aware of the potential for historic archaeological resources which may include previous building locations, wells, privies, etc. on the property area where demolition is proposed. The State Division of Historical & Cultural Affairs can provide technical assistance when dealing with archaeological resources including previous studies of the subject properties.
  • 9)Following Planning Commission approval of the Site Development Master Plan, the Plan must be revised to document all conditions of approval from the Development Advisory Committee or as otherwise noted. This process involves submission of Check Prints in order to achieve Final Plan approval; the finalization of the Master Plan and the Site Plan for Phase 1 can be achieved together. Then the Site Plan of each construction phase/project area (Phases 2-3) must be submitted for Administrative Site Plan Review by the Planning Office and other agencies. Zoning Ordinance, Article 10 §2.44 (D) sets forth the construction timing in relation to approvals. Article 10 §2.44 (D) Expiration of planning commission approval. For projects which are reviewed and approved by the planning commission as conceptual master plans, approval of the conceptual master plan shall remain valid for a period not to exceed five years from the date of planning commission approval, provided that the authorized construction or use has commenced within two years of approval and is proceeding toward completion. In addition, the time between the completion of one phase and the initiation of the next phase shall not exceed a period of two years.
  • 10)The applicant/developer shall be aware that prior to any ground disturbing activities on the site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections and permits are required.
  • 11)For building new construction, the requirements of the building code and the fire code must be complied with. Consult with the Building Inspection Staff and City of Dover Fire Marshal

23

Página 24

Item 3. S-26-01 Bayhealth Medical Center Inc. – Kent Campus: Master Plan Phase 1-3 DAC Report of January 7, 2026

regarding these requirements. The resolution of these items may impact the site design including such items as building dimensions and height, building openings, and fire protection needs, etc.

  • 12)The applicant shall be aware that this Master Plan approval does not represent a Building Permit, Demolition Permit, and associated construction activity permits. An Administrative Building Permit will be utilized as a tracking mechanism for site improvements. Demolition Permits are required to demolish any buildings. A separate application process is required for issuance of Permits from the City of Dover.
  • 13)The applicant shall be aware that Master Plan approval does not represent a Sign Permit, nor does it convey permission to place any sign on the premises. Certain types of signage require a Sign Permit from the City of Dover prior to placement of any such sign; please consult with Planning Staff in regard to signage.

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.

24

Página 25

Item 3.

CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: DECEMBER 31, 2025

APPLICATION: Bayhealth Medical Center, Inc. – Kent Campus: Master Plan Phases 1-3 FILE #: S-26-01 REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services CONTACT PHONE #: 302-736-7025 CONTACT EMAIL: jlyon@dover.de.us

T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .

T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :

CITY AND STATE CODE REQUIREMENTS

SANITATION / STORMWATER / STREETS / WATER / WASTEWATER / GENERAL

  • 1.Our office has no objection to the master plan. Further requirements will be provided if additional development plans are submitted, this specifically refers to the sanitary sewer plan.

TYPICAL CITY AND STATE CODE REQUIREMENTS REQUIRED FOR EACH FUTURE ADMINISTRATIVE SUBMISSION STORMWATER 1. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert elevations must be labeled on all stormwater structures. 2. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from Kent Conservation District is submitted to our office. STREETS 1. Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted to our office. SANITATION 1. The subject property cannot be serviced by the City of Dover. Provide a note on the plan stating that sanitation services will be provided by a private hauler. WATER 1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information. 2. The following notes must be added to the plans: 25

Página 26

Item 3.
Bayhealth Medical Center, Inc. – Kent Campus: Master Plan Phases 1-3
File #: S-26-01
December 31, 2025

  • a.Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project.
  • b.Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
  • c.The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736- 7025 prior to the start of construction. A representative from the City of Dover Department of Water & Wastewater must observe and approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted in the field due to conditions of the existing main. Possible conditions that would require tapping relocation include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be held responsible for field conditions requiring adjustment of the tapping location or for any work required by the contractor to make an appropriate and lawful connection.
  • 3.The size, type, and location of all proposed and existing water lines and valves must be shown on the plan.
  • 4.Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine the size of the domestic and irrigation (if applicable) water meter for the proposed building. These projections must be submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meter must be installed in a pit per City of Dover requirements and manufacturer’s recommendations. Also, a dual check valve is required downstream of the meter.
  • 5.The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap and valve are located within five feet (5’) to ten feet (10’) of the building. A blow up detail of this layout is recommended.
  • 6.Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The Department of Water & Wastewater will test and inspect all fire mains to a blind flange located inside the buildings. The blind flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the floor to the ninety degree (90) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through walls and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with mechanical designer.
  • 7.A minimum of fifteen feet (15’) shall be provided between the fire hydrant and fire hydrant valve.
  • 8.Please provide more detail on the proposed connection of this service to the City’s water main in Bay Road. Our records indicate that the water line is not connected to the water main in Bay Road. WASTEWATER
  • 1.All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information.
  • 2.The following notes must be added to the plans:
  • a.Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Public Works specifications and requirements.
  • b.Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff, subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as “…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no illegal discharges to the sanitary sewer system are created with the site improvements.
  • 3.The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines. Rim and invert elevations must be labeled on all sanitary structures. 26

Página 27

Item 3.
Bayhealth Medical Center, Inc. – Kent Campus: Master Plan Phases 1-3
File #: S-26-01
December 31, 2025

  • 4.Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty cast iron frame and cover to prevent damage to the cleanout and lateral.
  • 5.Sizing (flow) calculations must be submitted for all sanitary sewer laterals (other than for single-family dwellings) showing that velocity and all other requirements are met.
  • 6.The minimum size of all sanitary sewer laterals shall be six-inch (6”).
  • 7.Sanitary sewer services shall be provided to 737 N. DuPont Highway.
  • 8.If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County ordinance requirements, must be provided. A construction detail for the proposed grease trap, as well as the proposed location, must be provided on the plan.
  • 9.Please provide calculations that support the existing pump station in this basin can properly accept the proposed flow from this development. If upgrades are required to the pump station, the developer will be responsible. GENERAL
  • 1.All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must be included as a note on the plan.
  • 2.No trees may be planted within ten feet (10’) of utility infrastructure.
  • 3.The final site plan must be submitted in the following compatible digital formats:
  • a.AutoCAD 2018 (.dwg format).
  • b.Adobe Reader (.pdf format).

RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES STORMWATER / STREETS / SANITATION / WATER / WASTEWATER / GENERAL 1. None

ADVISORY COMMENTS TO THE APPLICANT

WATER

  • 1.The City of Dover water system is available to this site. The developer is responsible for all costs associated with extending and providing service to the proposed development.
  • 2.Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking Water for review and approval. The owner/developer will be responsible for providing all completed forms and plan sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the Office of Drinking Water until review has been completed by our office.
  • 3.Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water & Wastewater directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the site.
  • 4.Water impact fees will be required to be paid prior to Certificate of Occupancy for this project. WASTEWATER
  • 1.The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated with extending and providing service and capacity to the proposed development.
  • 2.Prior to plan approval, the sanitary sewer system plans may be required to be submitted to the DNREC, Division of Water Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible for providing all application fees, completed forms and plan sets directly to DNREC.

27

Página 28

Item 3.
Bayhealth Medical Center, Inc. – Kent Campus: Master Plan Phases 1-3
File #: S-26-01
December 31, 2025

  • 3.Wastewater impact fees will be required to be paid prior to Certificate of Occupancy for this project. GENERAL
  • 1.The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned, flowable fill may be required.
  • 2.This project will require a State Utility Permit to be submitted to Delaware Department of Transportation. This application shall be created by the developer.
  • 3.Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team- logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88. STORMWATER / STREETS / SANITATION
  • 1.None

I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .

28

Página 29

C F
S-26-01
Item 3.
I I
T R
CITY OF DOVER Y E

DEVELOPMENT ADVISORY COMMITTEE O M

F A APPLICATION REVIEW COMMENTARY R D.A.C. MEETING DATE: December 31, 2025 D S O H V A E L R APPLICATION: Bayhealth Medical Center Kent Campus Master Plan Phase 1-3

FILE #: S-26-01 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal

CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457 josika@dover.de.us

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.

THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE APPLICANT:

CITY AND STATE CODE REQUIREMENTS:

  • 1.Proposed occupancy classification is hospital/health care and possibly storage.
  • -Phase 1A ER overbuild 2 stories and central service addition 6,000 ft2 (central service addition is the possible storage occupancy)
  • -Phase 1B Bed Tower 6 story overbuild
  • -Phase 2A new 5 story parking garage (storage occupancy) and main entrance expansion and drop off
  • -Phase 2B Demo of existing parking garage and a podium expansion as 2 story surgical pavilion
  • -Phase 2C ER/ED 3 story expansion
  • -Phase 3 demo of existing legacy building
  • 2.Building Access shall be no further than 50 feet from a primary entrance.

Where buildings are provided with an automatic sprinkler system installed in accordance with NFPA 13, access shall be no further than 100 feet from the primary entrance. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)

  • 3.Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times the width of the door(s) or for 10 feet, whichever is greater. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
  • 4.Perimeter access shall be (see below) and clearly shown on the plans.
  • -Phase 1A hospital 100% storage 50%
  • -Phase 1B hospital 100%
  • -Phase 2A storage 100% hospital 100%
  • -Phase 2B hospital 100%
  • -Phase 2C hospital 100% 29

Página 30

Item 3.

  • •Phase 3 N/A

Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings of two or more stories, measured from the face of the building at grade with a maximum slope of ten percent (10%). Plantings and utility services (includes condenser units, transformers, etc.) shall be permitted within the perimeter access, and shall not interfere with emergency services fire ground operations.

If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building perimeter shall not be included in the calculation of Percent of Perimeter Access. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)

Where parking is located between the building and perimeter access area, parking shall not be located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of two or more stories.

  • 5.Fire lanes shall cover (see below) of the proposed building.
  • -Phase 1A hospital 75% plus rear access is 100% storage 25%
  • -Phase 1B hospital 75% plus rear access is 100%
  • -Phase 2A storage 50% including rear access (front and rear complete coverage) hospital 75% plus rear access is 100%
  • -Phase 2B hospital 75% plus rear access is 100%
  • -Phase 2C hospital 75% plus rear access is 100%
  • -Phase 3 N/A

Fire lanes are required to be 24 feet wide and run along the front of the building as determined by the primary entrance(s). In cases where there is more than one primary entrance(s), each shall be served by a fire lane even if this exceeds the percentage as required.

The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and the closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one or two stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in height. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5)

  • 6.Where parking is located between the building and the fire lane, parking shall not be located closer than 15 feet to the exterior wall. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1) Where parking is located between the building and the perimeter access area, parking shall not be located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of two or more stories. 2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5.2
  • 7.All Fire Lanes shall be marked as follows:

both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top and face of the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid yellow demarcation line shall mark the edge(s) of the fire lane. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)

  • 8.The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be suitable for street surfaces

30

Página 31

Item 3.

  • 9.Fire lane signs shall be located as follows:

see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150 foot intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher than eight feet (8’) above the pavement, signs shall be placed at each end of the fire lane, and signs shall face all oncoming traffic.

Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in lieu of fire lane signs and shall conform to the specifications of 7.6. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)

  • 10.Where overhangs, canopies, balconies, or any other building or site features must project over any fire lane, an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall be provided and the portion of the building perimeter which contains overhangs, canopies, balconies, or any other building features shall not apply towards the fire lane accessibility requirements of Section 4.0, Table 5-1 in this chapter. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.8)
  • 11.All access roadways shall be paved and be a minimum of 20 feet clear width for two-way traffic and 14 feet clear width for one-way traffic. The paved width of access roadway shall be measured from edge of parking spaces, or face of curb for vertical curb and back of curb for mountable curb, or edge of pavement if there is no curbing.(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 5.2)
  • 12.Emergency access to rear building areas compliant with City of Dover Code (Appendix B- Zoning, Article 5- Supplementary Regulations, Section 17);

all four stories and greater buildings require 24ft fire lane at the rear.

All two to three story apartment structures require an 18ft Secondary Fire Lane at the rear.

All townhouses (3-8 units with no fire protection) require a 16ft alley or 18ft secondary fire lane at the rear.

  • 13.Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in reference to this process.
  • 14.Gated Areas: Fire Department access shall be provided to the property through the use of a system or device approved by the Fire Marshal. The system or device required shall be located in an area accessible to the fire department and approved by the Fire Marshal. All gates shall be either automatic or manual.

An automated system shall consist of one manual and one automated means to open the gate. The owner or their representative shall meet with the Fire Marshal prior to submission to agree on the system. A letter of agreement shall be created and signed by both parties. The letter shall include a detailed description of both the manual and automated means.

A manual gate shall consist of one manual means to open the gate. The owner or their representative shall meet with the Fire Marshal prior to submission to agree on the means to open. A letter of agreement shall be created and signed by both parties. The letter shall include a detailed description of the manual means to open. To be considered accessible for fire department apparatus the actual clear openings shall be not less than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate shall be setback from the perpendicular street by at least 50 feet. Please contact this office to discuss options available to comply with this requirement. 31

Página 32

Item 3.

(2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)

  • 15.Fire hydrants shall be installed per the requirements of City of Dover Public Utilities Water/Wastewater Handbook, NFPA requirements, and Delaware State Fire Prevention Regulations. City Ordinance Sec 46-9 (f). 5.1.1 Hydrant spacing as shown in the Fire Flow Tables shall be used as a general rule. Hydrants shall be located at the direction of the State Fire Marshal so as to minimize friction in fire hose. All hydrant spacing shall be located along available roads or at the direction of the State Fire Marshal. This measurement shall be calculated by way of accessible thoroughfare(s) from the building to be protected to the hydrant and may not necessarily be a radius. 5.1.3 Additional hydrants shall be provided when the State Fire Marshal deems it necessary based on the configuration of the site, building(s), exposures, construction, occupancy, and/or specific hazard(s). Fire Flow table 2, hydrant spacing shall be 800 feet on center for one and two family detached dwellings, other residential, rowhouses and townhouses, assembly, health care, business, education, storage, industrial, mercantile, and mini storage. (702, Chapter 6)

NFPA 1

18.5.2 detached one- and two-family dwellings, fire hydrants shall be provided for detached one- and two-family dwellings in accordance with both of the following: 1. the maximum distance to a fire hydrant from the closest point on the building shall not exceed 600 feet 2. the maximum distance between fire hydrants shall not exceed 800 feet.

18.5.3 buildings other than detached one- and two-family dwellings, fire hydrants shall be provided for buildings other than detached one- and two-family dwellings in accordance with both of the following 1. The maximum distance to a fire hydrant from the closet point on the building shall not exceed 400 feet 2. The maximum distance between fire hydrants shall not exceed 500 feet

  • 16.All fire hydrants shall be marked as prescribed within the appropriate section of this regulation and as illustrated by the appropriate figures of this regulation.

All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define specific areas, where fire hydrants are located along a curb line with permitted parking, the area between the fire hydrant and the street or fire lane shall be stenciled with four inch (4") demarcation lines and the words "NO PARKING", demarcation lines shall be measured from the center line of the fire hydrant and extend for a distance 15 feet on both sides.

Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked vehicles they shall be treated as follows: fire hydrants shall be protected in all directions for a distance of seven feet (7') with barriers or curbing, Minimum four-inch (4") diameter steel bollards filled with concrete and marked yellow shall be installed at the outermost corners of the fire hydrant demarcation area. The minimum height of the bollard shall be 36 inches above the finished grade of the adjacent surface, and the steamer connection of all fire hydrants shall be positioned so as to be facing the edge of the street, or traffic lane. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2) The owner is responsible if the hydrant is private.

  • 17.Hydrant barrels shall be provided with reflective material, such as paint, durable for highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel under the top flange, hydrant bonnets shall be color coded based on the following criteria: class AA 1500 GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 - 32

Página 33

Item 3.

999 GPM - painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM - painted black. (2021 Delaware State Fire Prevention Regulations 703, Chapter 3. 4) The owner is responsible if the hydrant is private.

  • 18.Hydrants are to be Darling Co. B-62-B Breakaway https://american-usa.com/products/valves-and- hydrants/fire-hydrants/5-1-4-american-darling-b-62-b-5
  • 19.NFPA 72 compliant Fire Alarm System required per occupancy code requirements.

Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an occupancy determined to be a place of assembly by the fire marshal and is capable of receiving an occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with NFPA codes governing the installation of fire alarms and the National Electrical Code.

Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined to be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50 percent of the assessed value of the building and is capable of receiving an occupant load 75 persons or greater or is being enlarged to receive an occupant load of 75 persons or greater, shall be required to install a complete fire alarm system in accordance with NFPA codes governing the installation of fire alarms and the National Electrical Code.

Public mode audible requirements. To ensure that audible public mode signals are clearly heard by occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average ambient sound level or five decibels (dB) above the maximum sound level having a duration of at least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area required to be served by the system using the A-weighted scale dBA. In the event the stated requirement cannot be met a shunt trip relay/switches shall be the approved method of meeting the intent of this section of the Code. (City Code of Ordinances 46-171)

  • 20.Sprinkler system required. System is to be monitored by an approved Fire Alarm System.

This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions which are modified by more than 50% after the effective date of these Regulations. The 50% figure shall be calculated utilizing the gross square footage of the building, structure, marine vessel, premises and conditions as to arrive at the correct application.

Any proposal that is presented to the Office of the State Fire Marshal for review and approval for a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross square footage of a non-sprinklered building, may not have another such project for the same building submitted for review and approval any sooner than three (3) years after the date of the final inspection unless sprinkler projection is provided throughout the entire building.

In all buildings exceeding 10,000 square feet of aggregate, gross floor area.

In all buildings in excess of 40 feet in height or more than four (4) stories in height.

33

Página 34

Item 3.

In all buildings or areas thereof used for the storage, fabricating, assembling, manufacturing, processing, display or sale of combustible goods, wares, merchandise, products, or materials when more than two (2) stories or 25 feet in height.

In all basement areas exceeding 2,500 square feet floor area.

In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and exceeding two (2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or

Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment buildings storage areas except individual unit closets that are located within individual residential living units.

In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA 101, as adopted and/or modified by these Regulations. In all buildings or areas classified as "high hazard" under the Life Safety Code, NFPA 101, or "extra hazard" under the Standard for the Installation of Sprinkler Systems, NFPA 13, as adopted and/or modified by these Regulations.

All buildings used as dormitories, in whole or in part, to house students at a public or private school or public or private institution of higher education. (16 Del.C. Ch. 88) This applies to all such dormitories regardless if new or existing.

(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)

Places of assembly shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13 when the following apply:

All new indoor places of assembly with an occupant load of 150 persons or greater.

Any interior renovations of 50 percent or more to an existing place of assembly with an occupant load greater than 150 persons.

Any additions or increase in interior size to an existing place of assembly that would create an occupant load of 150 persons or greater.

Places of assembly where alcohol is served for consumption on the premises shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13 when the following apply:

All new indoor places of assembly with an occupant load of 100 persons or greater and where alcohol will be served for consumption on the premises.

Any interior renovation of 50 percent or more to an existing place of assembly with an occupant load greater than 100 persons and where alcohol will be served for consumption on the premises.

34

Página 35

Item 3.

Any additions or increase in interior size to an existing place of assembly which would create an occupant load of 100 persons or greater and where alcohol will be served for consumption on the premises.

New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13. (City of Dover Code of Ordinances 46-162)

NFPA 101, 12.3.5.1 The following assembly occupancies shall be protected throughout by an approved, supervised automatic sprinkler system in accordance with 9.7.1.1(1): 1. Dance Halls 2. Discotheques 3. Nightclubs 4. Bars 5. Restaurants 6. Assembly occupancies with festival seating

  • 21.Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow located within 50 feet of main entrance. Access to the Fire Department Connection must be clear unobstructed access as defined by the AHJ.

Fire department connections. Unless otherwise approved by the fire marshal, fire department connections shall be on the street side of the building and shall be located and arranged so that hose lines can be readily and conveniently attached to without interference from any nearby obstructions as defined by the fire marshal's office. Fire department connections shall be a five- inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover Fire Hydrant and within 50 feet of the main entrance of the structure it serves. All fire department connections shall be not less than three feet nor more than five feet in height above finished grade. The fire marshal shall have the authority to require more stringent requirements when deemed necessary. (City of Dover Code of Ordinances 46-162)

  • 22.Parking and/or obstructions shall be prohibited in front of fire department connections for a distance measuring from the center line and extending four feet on both sides. (2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
  • 23.Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose would come off the fire equipment.
  • 24.If there is any type of rack storage, the following will be required: 1) a diagram showing the layout and type of rack system 2) a list and quantity of items being stored 3) a letter from an authorized/licensed fire suppression contractor stating that in rack sprinklers are or are not needed. If in rack sprinklers are not needed, a letter may be requested from an authorized/licensed fire suppression contractor to ensure that the sprinkler system is adequate for the storage presented.
  • 25.All standpipe and sprinkler connections shall be marked as prescribed within the appropriate section of this regulation and as illustrated by the appropriate figures of this regulation. All standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow demarcation lines to define specific areas, Solid yellow demarcation lines shall be measured from the center line of the connection and extend for a distance of four feet (4') on both sides, and where parking is allow between the building and the street or fire lane the solid yellow demarcation lines shall extend from the end of the sidewalk surface to the street or fire lane (Markings shall not be required on the sidewalk surface).

35

Página 36

Item 3.

All fire department connections (standpipe and sprinkler) shall have a minimum 12" x 18" sign that reads FIRE DEPT. CONNECTION, sign lettering shall be a minimum of 3 inches (3") in height with red scotchlite letters on white scotchlite background. The sign shall be clearly visible from the fire lane or roadway, and signs using NFPA international symbols shall be an acceptable alternative. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)

  • 26.Standpipes shall be provided in all areas and buildings as required in the codes and standards listed in Regulation 701 as well as the following areas or buildings:

In all Class A and Class B places of assembly and institutional occupancies two (2) stories or 25 feet in height or over,

In any building over three (3) stories, In any building over 35 feet in height,

In any building that has a floor above the first floor over 10,000 square feet gross floor area,

In all buildings where the 1st floor exceeds 60,000 gross square feet,

a Class I horizontal standpipe system installed in accordance with the applicable codes and standards listed in Regulation 701 of these Regulations shall be provided. All standpipe systems shall be installed in accordance with the applicable codes and standards listed in Regulation 701.

The standpipe system shall be carried up with each floor and shall be installed and ready for use as each floor progresses.

Standpipes shall not be more than one floor below the highest forms of staging,

The 2½-inch of hose connections on Class I systems shall be provided in the following locations, At the highest intermediate landing between floor levels in every required exit stairway,

Where intermediate landing is not provided, hose connections shall be permitted to be located at the main floor landings in exit stairways when approved by the authority having jurisdiction, Where the local fire department has the capability of providing the required pressure, hydraulically designed standpipe systems in fully sprinklered, non-high-rise buildings shall be designed to provide the required waterflow rate.

A sign shall be provided at each landing, in all interior stairways, designating the floor level. (2021 Delaware State Fire Prevention Regulations 702, Chapter 4, 2)

  • 27.The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be protected from impact damage by impact protection. Natural gas and LP gas meters, regulators, and valves located inside structures shall have impact protection, except when located in separate protected utility rooms.

Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48 inches (four ft.) in height above the finish grade elevation. Any deviation of the stated requirements must be approved by the fire marshal and/or chief building inspector. The above dimensions shall serve as the requirement for installation; however, the fire marshal and/or chief building inspector shall have the authority to require more stringent dimensions to fit the needs of devices warranting impact protection.

36

Página 37

Item 3.

Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors shall be of fluorescent or have a reflective coating. Any deviation of the stated requirements must be approved by the fire marshal and/chief building inspector. (City of Dover Code of Ordinances, 46-4)

  • 28.Every house, building or structure used or intended for use as living quarters or as a place for conducting business, and having any wall facing or abutting any public or private street or alley, shall have displayed on that wall, in legible, easily read characters which are of contrasting color to the background, the proper street number for such house, building, or structure in accordance with the following:

One-family and two-family residential structures, height, the number shall measure a minimum of four inches in height, location, the number shall be placed on the house above or to the left or right of the front entrance, color, the number shall be contrasting to the background color, Arabic numerals, all numbers shall be Arabic numerals.

Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when identifying individual apartments with exterior doors, and 12 inches when identifying buildings with apartment complexes where there are two or more buildings not assigned street addresses. Individual buildings with street addresses shall have numbers measuring six inches, location, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot, color, numbers shall be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic numerals.

Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in height, location generally, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot,

property line or driveway, should the building be located far enough from a public or private road so that the numbers are not clearly visible from the street, then the street address shall also be posted on the property at or near the property line or driveway to said building,

color; each building, numbers shall be contrasting to the background color and shall be placed on each building in the complex,

Arabic numerals, all numbers used shall be Arabic numerals,

Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number affixed to the front of the tenant space and on the outside of the rear door which corresponds with that tenant space. Numbers shall measure six inches in height. (City of Dover Code of Ordinances, 98-344)

  • 29.A lock box (Knox) containing any and all means necessary for fire department access shall be provided at the following occupancies: any occupancy that contains a fire alarm signaling system that is monitored off-site, or any occupancy that contains an automatic sprinkler system. (2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)

Secured key systems. When required; exemption. A secured key system shall be required for any new or existing building where a fire alarm or sprinkler system is being installed. It shall be the responsibility of the owner or occupant to keep a set of keys 37

Página 38

Item 3.

in the secured key box that are current to the locks of the protected occupancy. Buildings with 24-hour staffing or guard service shall be exempt from this subsection.

Location. The secured key system shall be located as close to the main entrance as possible. Should the building design not allow the secured key system to be located by the main entrance, the fire marshal and fire chief shall come to an agreement as to an alternate location for the key box. A secured key system, once installed, shall not be obstructed from view or obstructed by any means that would delay the fire department access to the box.

Required keys. Keys to be secured in the key box shall include keys to all points of ingress or egress, whether on the interior or exterior of the building, and keys to locked mechanical rooms, electrical rooms, elevator rooms, fire alarm and sprinkler controls and any area protected by automatic fire detection. Keys to individual residential apartment units are not required.

Ordering responsibility. It shall be the responsibility of the general contractor to order the key box for new buildings. It shall be the responsibility of the owner or tenant to order the key box for existing buildings.

Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted before the installation of a key box. (City Code of Ordinances 46-127)

Knox Box to be mounted 6 feet above ground level

  • 30.All required means of egress shall have an exit discharge consisting of a non-slip surface and leading to and terminating at a public way. NFPA 101
  • 31.All new passenger elevators in a building shall be provided with a car sized to accommodate an ambulance cot 24 inches (609 mm) by 84 inches (2133 mm) in its horizontal open position. Where two or more new passenger elevators are located in a single hoist way and serve all or the same portion of the building, only one elevator car that provides a car sized to accommodate an ambulance cot 24 inches by 84 inches in its horizontal position for each hoist way shall be required. Elevator cars required to comply with 15.1 or 15.2 shall be identified by the international symbol for emergency medical services (star of life). The symbol shall be not less than 3 inches (76 mm) in height and shall be placed inside on both sides of the hoist way door frame. Firefighter recall keys shall be provided in a manner acceptable to the local fire department. (2021 Delaware State Fire Prevention Regulations 705, Chapter 1, 15)
  • 32.Buildings over 25,000 Sq. Ft are to have radio performance testing done prior to Final CO. This must be scheduled in advance with an authorized vendor.
  • 33.Project to be completed per approved Site Plan.
  • 34.Full building and fire plan review is required.

38

Página 39

Item 3.

  • 35.Separate building permits/plans submission will be required for each building and/or tenant fit out. If the permit submission is for a “shell” a Certificate of Occupancy will not be issued. Separate plans and permits submissions will be required for each “tenant fit out” at which time a Certificate of Occupancy will be issued upon compliance/completion of each “tenant fit out”.

Each “shell” will require a fire permit for sprinkler and fire alarm if applicable. Those systems (for the “shell”) must be accepted into service prior to any “tenant fit out” fire permits being issued.

  • 36.Construction or renovations cannot be started until building plans are approved.
  • 37.Fire alarm systems, fire suppression systems, hoods, exhaust ducts, and hood suppression systems require a fire permit from the Fire Marshal’s Office. This work cannot be started until the permit is approved.
  • 38.Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
  • 39.The following is City Ordinance, Appendix B-Zoning, Article 8 Enforcement and Penalties:

Section 1. - Building permits.

No building or structure in any district shall be erected or structurally altered without a building permit duly issued upon application to the building inspector. No building permit shall be issued unless the proposed construction or use is in full conformity with all the provisions of this ordinance. Any building permit issued in violation of the provisions of this ordinance shall be null and void and of no effect, without the necessity for any proceedings for revocations or nullification thereof, and any work undertaken or use established pursuant to any such permit shall be unlawful (see section 4 for penalties).

1.1 No building permit shall be issued for the construction or alteration of any building upon a lot without frontage upon, or legal permanent access to, a public street improved to the satisfaction of the planning commission, or without access to a public sewer.

1.2 No building permit shall be issued for any building where the site development plan of such building is subject to approval by the planning commission, except upon approval of such plans approved by the said commission.

1.21 No building permit shall be issued for any building in a subdivision unless the subdivision plot has been approved by the planning commission.

1.3 No building permit shall be issued for a building to be used for any conditional use in any zone where such use is allowed only with approval of the planning commission, unless and until such approval has been duly granted by the said commission.

(Ord. of 7-12-1993, § 3)

ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:

  • 1.Bayhealth has had this office actively involved in planning meetings (monthly)
  • 2.As of January 1, 2026, the Delaware State Fire Prevention Regulations adopted new editions of NFPA codes.
  • 3.This will be a high-rise building, please see additional comments listed below.
  • 4.Please advise if any floor is over 100,000 ft2. If so, additional comments will apply for large area buildings. Please contact me for those comments. 39

Página 40

Item 3.

  • 5.Need to discuss emergency service access during construction
  • 6.Need to discuss valet (current and future)
  • 7.Need to discuss fire lanes, rear access and perimeter access (item #’s 4, 5, 7, and 12 listed above). Especially distances from building to access the building.
  • 8.Need to discuss parking between building and fire lanes (item # 6 listed above)
  • 9.Overhangs need to be in compliance with item # 10 listed above and not interfere with Fire Lanes. (There are at least 2)
  • 10.Need to discuss fire hydrant locations
  • 11.Fire Alarm System and Fire Command Center need to be discussed
  • 12.Sprinkler system and number of and location of FDC’s needs to be discussed
  • 13.Standpipe systems need to be discussed
  • 14.Smoke Management system required
  • 15.All fire systems will need to remain in service during renovations
  • 16.State of DE Fire Marshal review required as well due to CMS
  • 17.Need to discuss old helipad
  • 18.Please refer to updated NFPA codes on the parking garage
  • 19.Phase 2A may have a hydrant and FDC that needs to be relocated 20.

APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):

2024 NFPA 1 Fire Code (NFPA; National Fire Protection Association) 2024 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association) 2025 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association) 2025 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association) 2009 IBC (International Building Code) Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations 2021 Delaware State Fire Prevention Regulations City of Dover Code of Ordinances

*If you have any questions or need to discuss any of the above comments, please call the above contact person listed.

Chapter 5 Mid Rise, High Rise and Large Area Buildings

1.0 Application 1.1 This chapter shall apply to all new buildings and this chapter shall apply to all existing buildings that undergo a change in occupancy. 1.2 This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions which are modified by more than 50% after the effective date of these Regulations. The 50% figure shall be calculated utilizing the gross square footage of the building, structure, marine vessel, premises and conditions as to arrive at the correct application. 1.3 Any proposal that is presented to the Office of the State Fire Marshall for review and approval for a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross square footage of a non-sprinklered building, may not have another such project for the same building submitted for review and approval any sooner than three (3) 40

Página 41

Item 3.

years after the date of the final inspection unless sprinkler projection is provided throughout the entire building.

19 DE Reg. 843 (03/01/16)

3.0 High Rise Building Fire Protection Features Required. 3.1 Fire Command Center 3.1.1 Every High Rise building shall contain a fire command center for fire department operations in a location reviewed by the responsible Fire Chief and approved by the Office of the State Fire Marshal. 3.1.2 The fire command center shall contain the following: 3.1.2.1 Voice alarm and public address panels 3.1.2.2 Fire department communications panel 3.1.2.3 Fire detection and alarm system annunciator panels and smoke management panels 3.1.2.4 Status indicator for elevator and annunciator indicating which elevators are operational 3.1.2.5 Status indicators and controls for air handling systems 3.1.2.6 Controls for unlocking all fire exit stairway doors simultaneously 3.1.2.7 Emergency power, light and system controls; and status indicators 3.1.2.8 Telephone and internet access for fire department use 3.1.2.9 Emergency and standby power status indicators 3.1.2.10 Generator supervision devices and manual start and transfer features 3.1.2.11 Public address system, where specifically required by other sections of this Code 3.1.2.12 Controls required for smoke control 3.1.2.13 Important Keys to include 3.1.2.13.1 Elevator machine room 3.1.2.13.2 Elevator hoistway door access key 3.1.2.13.3 Side access door elevator car key 3.1.2.13.4 Electric room keys 3.1.2.13.5 Fire pump room keys 3.1.2.13.6 Mechanical room keys 3.1.2.13.7 Any master key 3.1.2.14 As built drawings. Specific types and format of drawings to be determined by the Office of the State Fire Marshal at time of plan review. 3.1.3 The fire command center shall be separated from the remainder of the building by one-hour construction and equipped with a heating, ventilating and air conditioning system that will prevent smoke laden air from entering the space. 3.1.4 It is not the intent of this section to require a room dedicated for this purpose, but the area provided must be available for immediate use in case of emergency. 41

Página 42

Item 3.

3.1.5 The room shall be a minimum of 96 square feet with a minimum dimension of 8 feet. 3.1.6 The fire command room door shall be clearly identified for use by the fire department. 3.2 Emergency Voice/Alarm Communications and Detection System 3.2.1 Every High Rise building shall be equipped with a voice alarm, communication and detection system which shall be installed in accordance with the applicable codes and standards listed in Regulation 701 of these Regulations; and approved by the Office of the State Fire Marshal. 3.3 Public Address System 3.3.1 A public address communication system shall be part of the Emergency Voice/Alarm Communications System as required in §3.2 of this Chapter. The system shall be designed to be clearly heard by all occupants of the building and shall operate from the fire command center. It shall be established on a selective or general basis to the following terminal areas: 3.3.1.1 Elevators 3.3.1.2 Elevator lobbies 3.3.1.3 Corridors 3.3.1.4 Exit stairways 3.3.1.5 Rooms and tenant spaces exceeding 1,000 square feet in area 3.3.1.6 Dwelling units and guest rooms or suites. 3.4 Fire Department Communication System 3.4.1 A two way fire department communication system in accordance with the National Fire Alarm Code (NFPA 72) shall be provided for fire department use. 3.4.2 An alternative fire department radio enhancement system installed within the building shall be permitted in lieu of a two way fire department communications system, when approved by the Office of the State Fire Marshal. 3.5 Door Operation 3.5.1 All fire exit stairway doors which are to be locked from the stairway side shall have the capability of being unlocked simultaneously without unlatching upon a signal from the Fire Command Center. 3.6 Elevators 3.6.1 In every High Rise building at least one elevator service shall be provided for fire department emergency access to all floors. 3.6.2 Except for the main entrance level, all elevators shall open into a lobby (which may serve additional elevators) separated from the remainder of the building by a smoke barrier. Janitor closets, chutes, guest or tenant rooms, and service rooms shall not open into the elevator lobby. In addition, the provisions of ANSI Standard A 17.1 shall apply. 3.6.3 The elevator lobbies shall be permitted to be open to the remainder of the floor in buildings equipped with a mechanical smoke control system that will restrict smoke and hot gases from entering the elevator shaft on the fire floor. 3.7 Smoke Management Systems 3.7.1 In every High Rise building a Smoke Management system shall be installed in accordance with NFPA 92 and approved by the Office of the State Fire Marshal. Such system shall provide the following: 3.7.1.1 Egress Stair Tower Pressurization 42

Página 43

Item 3.

3.7.1.2 Area of Refuge Pressurization 3.7.1.3 Horizontal Exit Passageway Pressurization 3.7.1.4 Fire Floor Smoke Exhaust 3.7.1.5 Floor Above and Below Fire Floor Pressurization 3.7.1.6 Other criteria as deemed necessary by the Office of the State Fire Marshal for Unusual Spaces. 3.7.2 Smoke management system operation/actuation shall be approved by the Office of the State Fire Marshal.

3.8 Standby Power, Light, And Emergency Systems 3.8.1 In every High Rise building an emergency power supply shall be installed. 3.8.2 Standby power, light and emergency systems shall comply with the provisions of the Standard for Emergency and Standby Power Systems, NFPA 110, as adopted and/or modified by these Regulations. 3.8.3 Fuel Supply. An on premises fuel supply sufficient for not less than two hours full demand operation of the system shall be provided. 3.8.4 Generating Capacity. The standby system shall have a capacity and rating that will supply all equipment required to be operational at the same time. The generating capacity need not be sized to operate all the connected electrical equipment simultaneously. 3.8.5 All power, lighting, signal, and communication systems required by this Regulation shall automatically transfer to a standby source. The standby power system shall be connected to all systems listed in the NFPA 101 Life Safety Code. 3.9 Emergency Systems 3.9.1 Exit signs, exit illumination, and elevator car lighting are classified as emergency systems and shall operate within ten seconds of failure of the normal power supply and must also be connected to the standby source. 3.9.2 All required lighting, smoke management pressurization, electrically powered fire pumps and at least one elevator shall be connected to the standby power source. Elevators shall be provided with a selective load switch to allow transfer of power to each elevator. This will permit each elevator to be returned to the lobby and placed out of service except for fire department service. 3.10 Areas of Refuge. Areas of Refuge shall be provided in accordance with the requirements of Regulation 702, Chapter 3. 13 DE Reg. 629 (11/01/09) 19 DE Reg. 843 (03/01/16)

43

Página 44

Item 3.

From: Akbar, Ali (DelDOT)
To: Melson-Williams, Dawn; Purnell, Maretta
Cc: Mobley, Will (DelDOT)
Subject: EXTERNAL: DAC Plan Comments
Date: Friday, January 2, 2026 10:20:10 AM

Some people who received this message don't often get email from ali.akbar@delaware.gov. Learn why this is important

WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning,

Here are the comments from DelDOT for the applications discussed in the DAC Committee Meeting.

S-26-01 Bayhealth Medical Center, Inc. - Kent Campus: Master Plan Phases 1-3 Comments: Schedule a pre-submittal meeting with DelDOT

S-26-02 R.E. Pierson Regional Headquarters (Office, Garage and Contractors yard) at 30 Lafferty Lane Comments: Schedule a pre-submittal meeting with DelDOT NOTE: Project appears to have an entrance within the area of a Right Turn Lane on Eastbound Lafferty Lane to Cassidy Drive. Ensure entrance is NOT within the operational area of the RTL.

S-26-03 The Enclave Apartments: Revised Walker Road Apartments Comments: Schedule a pre-submittal meeting with DelDOT

S-26-04 DuPont Plaza at 747 N. DuPont Highway: Revised Master Plan Comments: Schedule a pre-submittal meeting with DelDOT

Please let me know if you have any questions.

Ali Akbar
Engineer I
DelDOT, Development Coordination
800 Bay Road
Dover, DE 19901
302-760-2910

44

Página 45

KENT CONSERVATION DISTRICT

Item 3.

1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG

CITY OF DOVER ADMINISTRATIVE SITE PLAN REVIEW JANUARY 2026

APPLICATION: Bayhealth Medical Center, Inc. – Kent Campus: Master Plan Phases 1-3 FILE #: S-26-01 REVIEWING AGENCY: Kent Conservation District CONTACT PERSON: Cullen Baker PHONE: (302) 608 - 5370 EMAIL: stormwater@kentcd.org

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:

Source: 2019 Delaware Sediment and Stormwater Regulations

CITY AND STATE CODE REQUIREMENTS:

  • 1.As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management plan must be reviewed and approved by the District prior to any land disturbing activity (i.e. clearing, grubbing, filling, grading, etc.) taking place. The review fee and a completed application is due at the time of plan submittal to the District’s office.
  • 2.The following notes must appear on the record plan:
  • a.The Kent Conservation District reserves the right to enter private property for purposes of periodic site inspection.
  • b.The Kent Conservation District reserves the right to add, modify, or delete any erosion or sediment control measure, as it deems necessary.
  • c.A clear statement of defined maintenance responsibility for stormwater management facilities must be provided on the Record Plan. ADVISORY COMMENTS TO THE APPLICANT:
  • 1.A pre-application meeting will need to be held with KCD prior to submitting plans for review.
  • 2.This site is within Tar Ditch/Meeting House Branch watershed, where we do not want to manage the 10 year or 100-year storms due to upstream flooding. We would only be reviewing for the RPv storm compliance.
  • 3.Please note the Kent Conservation District will not review an application more than three times. If after the third review the plan is still not found to be approvable, the application will be denied, and a new application with review fees are to be re-submitted to continue a detailed plan review.
  • 4.A letter of no objection to recordation will be provided upon approval of the Sediment and Stormwater Management Plan.

45

Página 46

Item 3.

CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
ADVISORY BRIEF Planning
D.A.C. MEETING DATE: 1/7/2026 Organization

S-26-01 Bayhealth Medical Center, Inc. - Kent Campus: Master Plan Phases 1-3

FILE # S-26-01 REVIEWING AGENCY: Dover/Kent County MPO

CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030

Attached, please find comments submitted by Dover Kent MPO for each of the current City of Dover Development Advisory Committee (DAC) applications. These comments are a part of the MPO’s ongoing goals of promoting transportation safety and connectivity within the region. They are submitted in accordance with the support given by the MPO Council on November 6, 2024.

Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be waived.

City of Dover Planning Commission
Site Development Plan Review

S-26-01 Bayhealth Medical Center, Inc. - Kent Campus: Master Plan Phases 1-3

The Bayhealth Master Plan seems to include many of the elements needed to walk safely to and from the site. Sidewalks are already present along the perimeter of the property. Pedestrian paths are also planned for the South Street entrance, as well as a crosswalk linking one side of the entrance to the other. Note that all sidewalks, pedestrian paths, and crosswalks should be accompanied by ADA ramps on each end; this is essential for creating an accessible space for hospital staff and visitors.

The wider connections beyond the site should also be considered. The Downtown Dover Pathways Plan identifies Governors Avenue as a high priority for safety improvements, as it has experienced bicycle and pedestrian fatalities in the past.1 Governors Avenue is a Minor Arterial with an Annual Average Daily Traffic (AADT) of 7,439 and a posted speed limit of 35 mph. Note that Governors Avenue between Division Street and South Steet is included in the High 1 Downtown Dover Pathways Plan. Dover/Kent County MPO (2024). https://doverkentmpo.delaware.gov/files/2024/08/Downtown-Dover-Pathways-Final-Report-2024-07- 11.pdf#page=45.

46

Página 47

Item 3.

Injury Network, according to the findings from the Kent County Safety Action Plan, which heightens the importance of safety improvements on the road.2 Although the plan does not list specific improvements for Governors Avenue, it does provide general strategies for improving the major roadways in Dover, and it recommends following the outcomes of the Downtown Dover Pathways Plan. Improvements to Governors Avenue would also be consistent with the goals laid out in Capital City 2030: Transforming Downtown Dover, the City’s downtown Master Plan.3

Finally, the applicant will need to meet the City of Dover’s requirements for bicycle parking on the site. This would best be met by including bike racks near the front of the building for easy access by patrons. These spaces should be included at a rate of one (1) bicycle parking space for every twenty (20) vehicle parking spaces. (See Dover Code – Appendix B, Article 6, Section 3.10.)4 If more information on various types of bike racks is needed, please contact Dover Kent MPO.

The above comments are based on preliminary observations of the Bayhealth Master Plan. Further comments will be provided by Dover Kent MPO during subsequent phases of the planning process.

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.

2 Kent County Safety Action Plan. Dover/Kent County MPO (2025). https://doverkentmpo.delaware.gov/files/2025/06/Kent-County-Safety-Action-Plan-FINAL-June- 2025.pdf#page=78. 3 Capital City 2030: Transforming Downtown Dover. Downtown Dover Partnership (DDP) (2023). https://www.downtowndoverpartnership.com/ddp/downtown-dover-strategic-master-plan/. 4 Dover Code: Appendix B, Article 6, Section 3.10. City of Dover. https://library.municode.com/de/dover/codes/code_of_ordinances?nodeId=PTIICOOR_APXBZO_ART6OREPAD RLOFA_S3REOREPASP.

47

Página 48

Item 3.

BICYCLE PARKING WAIVER REQUEST

BAYHEALTH MEDICAL CENTER, INC.
MASTER PLAN – COD # S-26-01

BICYCLE PARKING REQUIREMENTS

REQUEST: We are requesting a waiver to reduce the total number of bicycle parking spaces required for this project.

EXTENT OF THE REQUEST: By code, the project would be required to have eighty-five (85) bicycle parking spaces for the site. We are requesting a reduction of the required eighty-five spaces and utilize the existing bicycle parking spaces provided on the existing campus.

BASIS FOR REQUEST: Article 6, section 3.10 of the City of Dover zoning standards states Bicycle parking shall be provided for parking spaces at a rate of one bicycle parking space for every twenty parking spaces or a fraction thereof. The planning commission may waive the requirement for bicycle parking if it is demonstrated that bicycle parking would not be appropriate for safety reasons or due to the nature of the use of the site.

The campus currently has thirty-eight (38) bicycle parking spaces located at various locations throughout the campus and currently they are rarely utilized as monitored by Bayhealth Public Safety, and Transportation Services. Bayhealth will continue to monitor the use and will provide additional spaces if the demand increases.

48

Página 49

Item 3.

December 5, 2025

City of Dover Planning Commission
c/o Department of Planning and Inspections
P.O. Box 475
Dover, DE 19903-0475

RE: Synthesized Parking Adequacy Statement
BAYHEALTH MEDICAL CENTER, INC.
Dover, Delaware

Dear Commission Members:

Bayhealth is redeveloping its Kent Campus to replace more than 600,000 square feet of outdated legacy hospital buildings with a modern, vertically integrated facility that improves patient access, clinical efficiency, and code compliance. As part of this plan, the existing 371-space garage will be replaced with a new, more functional 500- space garage located directly at the main entrance, providing wider stalls, higher clearances, safer maneuvering, and more convenient access for patients and visitors.

The city’s IO zoning district historically required hospital parking based on beds (1 space per 3 beds), which would require only 89 spaces for the existing 266-bed hospital. A newer code standard based on square footage (1 space per 300 sq ft) would require 2,023 spaces. Bayhealth has long recognized that neither standard reflects actual hospital operations:

  • •Bed counts underestimate parking demand because a hospital contains many non-bed functions.
  • •The 1,300 sq. ft. ratio greatly overestimates demand, because patient rooms have very low occupancy densities, hallways and clinical areas are oversized for patient movement, and hospitals operate 24/7 with shifting staff. Actual usage data is the best reflection of true parking need. Today, the Kent Campus has 1,575 parking spaces serving 607,000 sq. ft., which equates to 1 parking space per 385 sq. ft., a ratio that Bayhealth has monitored and confirmed as adequate through continuous daily parking counts.

Under the masterplan, Bayhealth will remove 310,000 sq. ft. of obsolete legacy space, add modern clinical space, and consolidate the campus into 617,340 sq. ft. by Phase 3. However, significant parking demand will shift offsite to Bayhealth’s new Blue Hen Mall facility, including:

  • •Major outpatient services currently located in legacy buildings, eliminating the need for 200+ patient/visitor spaces onsite.

49

Página 50

Item 3.

  • •Administrative, HR, Accounting, Marketing, and other departments, reducing onsite staff parking by approximately 100 spaces. This reduces actual demand on the hospital campus even as new construction is added.

Applying the proven current parking ratio (1 space per 385 sq. ft.) to the post- demolition net functional space (623,340 sq. ft.) results in a need of 1,619 spaces. The Phase 3 masterplan provides 1,704 spaces, which is over 80 spaces more than needed, even before accounting for the offsite relocation of major staff and outpatient uses, which provides an even larger margin of adequacy.

Bayhealth continuously tracks parking utilization as part of its safety and operations program and has confirmed that the planned supply offers more capacity than today, with easier access, improved distribution, and greater visitor convenience due to the new State Street garage.

In summary, the proposed 1,704 parking spaces exceed actual demonstrated parking demand, reflect real operational data rather than outdated formulas, and provide a more functional distribution of parking for patients, visitors, and staff. The masterplan’s parking strategy is fully adequate for the campus’ long-term needs.

Sincerely,

BECKER MORGAN GROUP, INC.

Gregory V. Moore, P.E.
Principal

GVM/rlh

201918450aj-ltr.docx

50

Página 51

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

24x36 24x36

Item 3.

WWW.beckermorgan.com BAYHEALTH 713-0 1- ENGINEERS CERTIFICATION BUILDING DATA SITE DATA - SITE DEVELOPMENT MASTER PLAN 5-07 2019-184-50-Engineers-Cert-GVM 2019-184-50-Bldg-Data-001 2019-184-50-Site-Data-001R

SOUTH STREET 1

02-0 1-0000 PHASE GROSS S.F. FOOTPRINT S.F. FLOORS / HEIGHT BEDS 24x36 24x36

PARCEL I, GREGORY V. MOORE, P.E., HEREBY CERTIFY THAT I AM A REGISTERED ENGINEER IN THE STATE OF DELAWARE, 1. OWNER OF RECORD: BAYHEALTH MEDICAL CENTER, INC. 180 02-05-07713-01-1800-00001 THAT THE INFORMATION SHOWN HEREON HAS BEEN PREPARED UNDER MY SUPERVISION AND TO THE BEST OF EXISTING CAMPUS 640 SOUTH STATE STREET EET N N MY KNOWLEDGE AND BELIEF REPRESENTS GOOD ENGINEERING PRACTICES AS REQUIRED BY THE APPLICABLE STR HOSPITAL 607,000 S.F. 207,700 S.F. VARIES - 6 FLOORS: 90' 266 DOVER, DE 19901 ER ET WAT S TRE LAWS OF THE STATE OF DELAWARE. PARKING GARAGE 144,000 S.F. 28,800 S.F. 5 FLOORS: 75' C/O: MIKE METZING UTH 24x36 24x36

SO PHONE: 302-744-7027 mike_metzing@bayhealth.org PHASE 1 1A: EMERGENCY DEPT. OVERBUILD 53,140 S.F. OVERBUILD FLOORS: 2 - 3: 42' 2. ENGINEER OF RECORD: BECKER MORGAN GROUP, INC. 738 SOUTH GOVERNORS AVENUE 1A: CENTRAL SERVICE BLDG. ADDITION 6,000 S.F. 3,000 S.F. FLOORS: 1 - 2: 60' 24x36

DOVER, DE 19901 24x36

GREGORY V. MOORE P.E. NO.: 9311 DATE 1B: BED TOWER OVERBUILD 219,400 S.F. 1,675 S.F. FLOORS: 5 - 10 66 C/O: GREGORY V. MOORE & PENTHOUSE: 175' PHONE: 302-734-7950 gvmoore@beckermorgan.com SITE OWNERS CERTIFICATION PHASE 2 ARCH I T E C TURE ORS AVE. 2019-184-28L-Owners-Cert 3. PROPERTY MAP NUMBERS: 02-05-077.13-01-5200-000 BAYHEALTH CAMPUS PARCELS 2A: NEW PARKING GARAGE (500 SPACES) 180,000 S.F. 46,310 S.F. FLOORS: 1 - 4: 60'

SOUTH STATE STREET

24x36 24x36

WE, BAYHEALTH MEDICAL CENTER, INC., HEREBY CERTIFY THAT WE ARE THE OWNER OF THE PROPERTY 02-05-077.13-01-4800-000 (TO BE CONSOLIDATED) 2B: MAIN ENTRY ADDITION 7,100 S.F. 5,600 S.F. FLOORS: 1 - 2: 30' 02-05-077.13-02-0100-000 ENG I NE E R I NG

SOUTH GOVERN AY DESCRIBED AND SHOWN ON THIS PLAN, THAT THE PLAN WAS MADE AT OUR DIRECTION, AND THAT WE

BECKER MORGAN GROUP ARCHITECTURE - ENGINEERING DELAWARE - MARYLAND - NORTH CAROLINA - VIRGINIA

SITE2B: DEMO EXISTING PARKING GARAGE-116,000 S.F.-28,800 S.F.FLOORS: 1 - 5: 75'HOPE STREET PARKING LOT
ACKNOWLEDGE THE SAME TO US BY ACT AND DESIRE THE PLAN TO BE DEVELOPED AS SHOWN IN ACCORDANCE 02-05-077.13-02-0200-000
HIG
BAYHEALTH2B: SURGICAL PAVILION137,500 S.F.36.415 S.F.FLOORS: 2 - 3: 60'28PARCELSDover, DE

SOUTH GOVERN 02-05-077.13-02-1200-000 HW KENT CAMPUS WITH ALL APPLICABLE LAWS AND REGULATIONS.

SOUTH STATE STREET 25,200 S.F. 6,400 S.F. FLOORS: 1 - 3: 60'

ORS AVENUE

24x36

2C: EMERGENCY DEPART. EXPANSION

24x36

02-05-077.13-01-1800-000 SOUTH STREET PARKING

02-05-07713-01-5200-00001 13.13 ACRES 02-05-077.13-01-1801-000 PARCELS 309 S. Governors Ave. PHASE 3 Dover, DE 19904 ONT 3: DEMO EXISTING LEGACY BUILDING -310,000 S.F. -112,600 S.F. FLOORS: 1 - 6: 90' 4. TOTAL ACREAGE OF SITE: BAYHEALTH CAMPUS: 13.13 ACRES ± POST CONSOLODATION Ph. 302.734.7950 MIKE METZING VP, CORPORATE SUPPORT SERVICES DATE DUP HOPE STREET PARKING LOT: 1.49 ACRES ± 24x36

HOPE STREET POST PHASE 3 Fax 302.734.7965 24x36

HOSPITAL 623,340 S.F. 174,000 S.F. 360 SOUTH STREET PARKING LOT: 7.93 ACRES ± TH BAYHEALTH HOPE STREET GENERAL NOTES 2019-184-50RZ-G-Notes PARKING GARAGE 180,000 S.F. 46,300 S.F. TOTAL AREA: 22.55 ACRES ± Salisbury, MD SOU PARCEL

24x36 1. THE BOUNDARY LINES PORTRAYED HEREON HAVE BEEN ESTABLISHED BASED SOLELY ON PHYSICAL CENTRAL SERVICE BLDG. ADDITION 6,000 S.F. 3,000 S.F. 5. ZONING CLASSIFICATION: IO - INSTITUTIONAL & OFFICE 312 West Main St. Suite 300 24x36

EVIDENCE DISCOVERED IN THE FIELD IN CONJUNCTION WITH DETERMINATIONS DERIVED FROM SOURCE OF TOTAL: 809,340 S.F. 223,300 S.F. SWPOZ - SOURCE WATER PROTECTION OVERLAY ZONE Salisbury, MD 21801 CITY OF DOVER - KENT COUNTY, DELAWARE CITY OF DOVER - KENT COUNTY, DELAWARE TITLE AND ADJACENT DEED RECORD INFORMATION. NOTE: PARCEL NUMBER: 02-05-077.13-01-4800-000 WAS REZONED Ph. 410.546.9100 2. NO TITLE EXAMINATION FURNISHED TO OR PERFORMED BY THE PREPARERS HEREOF. PROPERTY SHOWN TO IO PER THE CITY OF DOVER APPLICATION Z-25-01. Fax 410.546.5824 VICINITY MAP SCALE: 1" = 1000' LOCATION MAP SCALE: 1" = 400' HEREON IS SUBJECT TO ANY RIGHT-OF-WAY, EASEMENTS, RESTRICTIONS, ETC. AS MAY BE SHOWN OR PARKING DATA 6. BUILDING SETBACKS: FRONT YARD: 10' Wilmington, NC 24x36 24x36 2019-184-50-Parking-Data-001

2-05-07713-01-5200-00001 2019184-51-V-Map-1000 2019-184-50-V-Map-400 NOTED IN ANY RECORD, PUBLIC OR OTHERWISE, OR ANY REQUIREMENT OR REGULATION OF ANY PUBLIC EXISTING CAMPUS REAR YARD: 15' AGENCY. T.P.: 2-05-07713-01-25 SIDE YARD: 10' 00-00001

  • 3.PORTIONS OF THE PROPERTIES SHOWN HEREON ARE LOCATED WITHIN THE SWPOZ (SOURCE WATER PARKING DATA: EXISTING: 371 GARAGE8 SPACES 13 1.99 ACR ES 3205 Randall Parkway, Suite 211 NOTE: A VARIANCE FROM THE 10' SETBACK LINE ALONG SOUTH PROTECTION OVERLAY ZONE). HOWEVER, THE CITY OF DOVER ZONING ORDINANCE (ARTICLE 3 - 29.79), OFF-STREET PARKING PER ARTICLE 4.15: 1,204 ON-GRADE SPACES Wilmington, North Carolina 28403 STREET WAS GRANTED TO ALLOW THE PROPOSED BED TOWER TO Ph. 910.341.7600 24x36 24x36

1 SPACE PER 300 S.F. OF FLOOR AREA OR TOTAL: 1,575 SPACES

PROVIDES FOR AN EXEMPTION FROM THE REQUIREMENTS AND RESTRICTIONS OF THE SOURCE WATER BE CONSTRUCTED OVER THE SETBACK LINE PER THE CITY OF B.R.L. OVERLAY ZONE BASED ON THE ABOVE MENTIONED PROPERTIES LOCATION WITHIN THE DOWNTOWN 1 PER EMPLOYEE (WHICHEVER IS GREATER) PARKING RATIO PROVIDED: 1,575/607,030 = 1 SPACE / 385 S.F. DOVER APPLICATION V-25-05. Fax 910.341.7506 DEVELOPMENT TARGET AREA. POST PHASE 2 9 4. X X X BASED ON THE FEDERAL EMERGENCY MANAGEMENT AGENCY FLOOD INSURANCE RATE MAP (FIRM), 8 13 7. BULK STANDARDS: IO - INSTITUTIONAL AND OFFICE www.beckermorgan.com NOTE: TOTAL G.F.A. FOR PARKING REQUIRED: 1,300 EMPLOYEES = 1,300 SPACES 24x36 24x36

LANDS N/F

PANEL 169 OF 435 COMMUNITY PANEL NO. 10001C0169J, DATED JULY 07, 2014, THE PROPERTY SHOWN MINIMUM AREA: 10,000 SQ. FT. SWPO X HOLDEN LEASING, LLC CALCULATIONS: 623,340 S.F. 623,340 G.S.F. / 300 = 2,078 SPACES 13 MINIMUM FRONTAGE: 100 FEET TM: 02-05-077.13-01-4000-000 HEREON IS LOCATED WITHIN ZONE X (AREA OF MINIMAL FLOOD HAZARD). (EXCLUDES THE PARKING GARAGE AND Z 8 X MINIMUM DEPTH: 100 FEET B.R.L. DEED: D 4274/26 5. BECKER MORGAN GROUP, INC. CERTIFIES THAT THERE ARE NO FRESH WATER WETLANDS LOCATED PROVIDED: 500 GARAGE SPACES X CENTRAL SERVICE ADDITION) ZONING: C3 WITHIN THE PROPOSED IMPROVEMENTS. BUILDING HEIGHT:X 150 FEET/10 STORIES 24x36

1.35 AC. NUMBER OF EMPLOYEES IS EXIS

BASED TING ONE STORY

1,204 ON-GRADE SPACES 24x36

BRICK BUILDING .FLOOR AREA RATIO:6.0
B.R.L.
20
X
ON THE LARGEST SHIFT.GOVERNORS AVETOTAL:1,704 SPACESX
560
T.P.: 2-05-07713-01-2501
-000MAX LOT COVERAGE:85%
1.75 ACRES

LANDS OF

LANDS N/F

X NOTE: A PARKING STRATEGY STATEMENT NOTE: A VARIANCE FROM THE 150' HEIGHT RESTRICTION WAS MENTOR PROPERTIES 1, LLC 9 24x36 BAYHEALTH MEDICAL TM: 02-05-077.13-01-4200-000 WILL BE SUBMITTED FOR REVIEW. PARKING RATIO 9PROVIDED: 1,704/623,340 = 1 SPACE / 366 S.F. GRANTED TO ALLOW THE BED TOWER TO BE CONSTRUCTED TO A 24x36

28CENTER, INC.DEED: D 8681/27MAXIMUM BUILDING HEIGHT OF 175' PER THE CITY OF DOVER
TM: 02-05-077.13-02-0100-000ZONING: C39
APPLICATION V-25-05.
DEED: V 48/146100.0.26 AC.SWPO10
00LANDS N/FLANDSSTORN/F8.IMPERVIOUS COVERAGE:IO ZONING - 85% PERMITTED
28
R.O. '
2
ZONING: IOJCD PROPERTIES, LLCEXISTING ONE
JCDBAYH
PROPERTIES,
Y BLDG.
LLC
Z
N 03W.
HUMAN RESOURCE
EXISTING CONDITIONS::9.8 AC. / 13.13 AC. = 75%
EALTH
  • S.G S AVE. 0.91 AC. 600 GOVERNOR 24x36 24x36

° 32 TM: 02-05-077.13-01-4300-000 TM: 02-05-077.13-01-4400-000 T.P.: 02 05 07713 01 4400 000

' 40" POST PHASE 1: 9.8 AC. / 13.13 AC. = 75% 0.77± ACRE S DEED: D 3418/95 DEED: D 3418/95 HOPE STREET E OVE POST PHASE 2: 10.6 AC. / 13.13 AC. = 81% 5 ZONING: C3 ZONING: C3 0.87 AC. 0.77 AC. POST PHASE 2: 8.5 AC. / 13.13 AC. = 65% RNO 12

X
PARKING B.R.
L.
9

RS

X23
24x3624x36

168 SPACES
AVE
B.R.L.
C-EX-L-SHRUBS
C-EX-L-TREE

X

.
RADIUS: 1004.93'
C-PR-L-TREE-PS

B.R. B.R.L.
C-PR-L-TREE-PS C-PR-L-TREE-PS

ARC LENGTH: 279.86' SWPO
L
FIRE
VAN

Z
24x36
X 24x36

B.R. CHORD BEARING: N 4° 26' 02" W

L. X . VAN CHORD LENGTH: 278.96' X 477. X 36' 17' 63.00' 24x36 24x36

99
668.
LANE
5
X8
B.R.R.O.W.
L.
9
24x3624x36

6 11
B.R.L.

WATER STREET

N .
24x36

10
FIRE LANE B.R.L.

SWPO

24x36

  • S.B CATH Z PO 10 LAB NO EXISTING RAD PARKING 7 EXISTING 8 CENTRAL SERVICES FIRE LANE F.D.C. ONE STORY 10

FOR

24x36 24x36

B.R. BUILDING BRICK BUILDING B.R.L. D S 567 X L. EXISTING 7,700 S.F. 50.00' FOOTPRINT: 20,800 S.F. T. BAYHEALTH - KENT CAMPUS AMBULANCE R.O.W. F.F. ELEV.: 22.16'

EET X

B.R.L.
ER ENTRANCE
24x36 24x36

EXISTING 3 STORY BRICK BUILDING10
FOOTPRINT : 151,500 S.F.PROPOSED
ED EXPANSION
X
SWPO
RAMPRAMP
710

PHASE 3 3 STORIES
PROPOSED
N 73° 21' 04" E
Z

STR DUMPSTER

PHASE 2C

24x36 24x36

PROJECT TITLE PROPOSED X COURTYARD DEMO THE EXISTING EMERGENCY DEPT. EXISTING SERVICE PARKING GARAGE PODIUM EXPANSION BAYHEALTH VAN DOCK

LEGACY BUILDING 2C OVERBUILD TRUCK DOCK 1

YARD X

EXISTING ROOF TOP

FOOTPRINT: 28,800 S.F.
UPON COMPLETION OF 3 STORIES
MEDICAL
24x36

HELIPAD 10 24x36

X
C-PR-BLDG-OB-ED-EXPANSION-BLK

FLOORS 2 THRU 3 FIVE FLOORS - 371 SPACES PHASE 2B X X X

ALL NEW FACILITIES PHASE 1A 1A TRUCK DOCK 2

HOP COURTYARD FIRST FLOOR ELEV.: 29.83'

CENTER, INC LANDS N/F X

1A 2B
TRUCK DOCK 3 X

E
807 BRADFORD, LLC
SWPO
B.R.L.
14"

LANDS OF

24x36 24x36

TM: 02-05-077.13-02-1300-000 Z
DEED: D 5163/270
X BAYHEALTH MEDICAL
B.R.
DUMPSTER

CENTER, INC.
ZONING: RGO L COMPACTOR

B.R.L.
TM: 02-05-077.13-03-6400-000

KENT CAMPUS . PO

C-PR-BLDG-OB-SURGERY-PAVILION

8X
DEED: 11644/304
5
C-PR-BLDG-OB-ED-BLKC-PR-BLDG-OB-SURGERY-PAVILION

EXISTING BRIDGE

24x36 24x36

ZONING: IO

SITE DEVELOPMENT X

PROPOSED PO

PO

PO

BED TOWER OVERBUILD 4 PO

PO

MASTER PLAN PO

24x36 PO
24x36

PO X PO PO

FLOORS 5 THRU 10 & PENTHOUSE SWPO Z 32

PROPOSED

SOUTH STRE

29COURTYARD
COURTYARDHEIGHT: 175.0'X

PHASE 1B

CENTRAL SERVICES 2005024-LARSON-B

LK
24x36 24x36

1B BUILDING X

35 640 S. STATE STREET 10 C-PR-BLDG-OB-BED-TOWER-BLK

EXISTING 2 STORIES CITY OF DOVER

6 STORY TOWER X

WELCOMEEXISTINGPHASE 1A3516
24x3624x36

PODIUM BUILDING LANDS OF 2004 - 3 STORY EXPANSION CENTER F.F.: 29.60' BAYHEALTH MEDICAL KENT COUNTY, DELAWARE B.R.L. W CENTER, INC X

B.R.1986 ADDITIONTM: 02-05-077.13-01-1800-000SHEET TITLE
12"L.EXISTING FIREDEED REF.: D 2750/94
36
24x3624x36

SWPOZ
B.R.L. COVER SHEET &
COMMAND CENTER
X
° 03' 16
PROPOSED C-PR-BLDG-OB-LOBBY-BLK
ZONING - IO

MAIN ENTRY
N 87 2 STORIES
36
SOUTH STREET
OVERALL LAYOUT
X

PHASE 2A APPROXIMATE LOCATION OF

LANDS N/F 34.0'

SOURCE WATER PROTECTION PARKING

24x36 24x36

BAYHEALTH MEDICAL 24.0' OVERLAY ZONE - TIER 3 (SWPOZ) X

462 SPACES

2AET
CENTER, INC.
TM: 02-05-077.13-02-3800-00031
DEED: D 130/66
LIMITS OF32
ZONING: R8
24x36X24x36
16,150 S.F. - 0.37 AC.3PROPSED CANOPY
'R20.0'
28
SWPOZ
PROPOSED
X
573'X
C-PR-L-TREE-AR

X X
2 SIDEWALKX (typ.)
X X X X

PROPOSED

24x36 24x36

733
13
CURB (typ.)X
8
C-PR-L-TREE-PS

33
C-PR-L-TREE-PS

3VALE8
1
X
4T624.0'
24x3624x36
579.03
6'B.R.L8B.R.L.
.31
03060120
6
X
B.R.L.
1B.R.L.
SWPOZ
24x36
30.00'EXISTING
ONE STORY
24x36

6 B.R.L. 29 X

B.R.L.
BRICK BUILDING Do Not Explode - Select Scale

SCALE: 1" = 60'

EX. TW

B.R.L5 6 0 6,200 S.F.
. FRAME STORY
D HOU X
SE
EX. TWO STORY 50.00'
PROPOSED
24x36

3
24x36

BRICK HOUSE
(OFFICE) R.O.W. 5 ISSUE BLOCK
60.00
X

R.O. W. ' B.R.L . PARKING GARAGE 20 B.R.L. B.R.L. 658.85' 4 STORIES - 500 SPACES X S 01 24x36 24x36

X ° 34' 34" W PHASE 2A LANDS N/F EX. 3 STORY BAYHEALTH MEDICAL BRICK BUILDING et-Commons 2A 2005-198-State-Stre X CENTER, INC. INT 20.00 ' TM: 02-05-077.13-01-1801-000 7,200 S.F. FOOTPR . 530 S. STATE ST X SWP PLATBOOK: 27-00018

  • S.S 24x36 24x36

X
LANDS N/F OZ ZONING: IO

TAT X CHURCH OF THE HOLY CROSS 1.30 AC.

E S
TM: 02-0-077.13-01-5600-000 TS
B.R.L. C-PR-BLDG-OB-GARGE-BLK

41.50' B.R.L.
DEED: Q 20/165
20.00'
ZONING: IO
FCM TRE
24x36 24x36

25.00'
X
11.3 AC.
ET B.R.L.

GENERAL SCOPE OF PROJECT 70.00' .
X
. . .
R.O.W
2019-184-50MP-Scope

60.00'
24x36 24x36

. RADIUS: 1402.69' MARK DATE DESCRIPTION

BAYHEALTH MEDICAL CENTER IS PROVIDING A SITE DEVELOPMENT MASTER PLAN WHICH IS TO BE SWP ARC LENGTH: 402.65' X R.O.W. LAYER STATE: C-101MP CONSTRUCTED IN 3 PHASES. OZ CHORD BEARING: S 6° 18' 06" E PHASE 1A: CONSTRUCT A TWO-STORY EXPANSION (OVERBUILD) OVER THE EXISTING EMERGENCY X CHORD LENGTH: 401.27' SHEET INDEX - MASTER PLAN PROJECT NO.: 2019184.50 DEPARTMENT. 2019-184-50-Sheet-Index

DATE: 2025-12-04

24x36 24x36

PHASE 1A: CONSTRUCT AN ADDITION TO THE EXISTING CENTRAL SERVICES BUILDING. C-001 COVER SHEET PHASE 1B: CONSTRUCT A SIX-STORY BED TOWER (OVERBUILD) OVER THE EXISTING FOUR-STORY BED TOWER. C-100 EXISTING CONDITIONS PLAN SCALE: AS SHOWN X

PHASE 2A: CONSTRUCT A NEW FIVE-STORY, 500 PARKING SPACE PARKING GARAGE. FCM C-101 EXISTING UTILITIES PLAN Do Not Explode

  • •Select Scale

DRAWN BY: M.A.R. PROJ. MGR.: M.A.R

24x36 24x36

PHASE 2A: CONSTRUCT A NEW TWO-STORY MAIN ENTRY AND NEW DROP-OFF AREA CONNECTING TO THE NEW X

VALANDS N/F
LANDS N/F
16C-200MASTER PLAN PHASES 1-3
PARKING GARAGE TO THE HOSPITAL.C-201MASTER PLAN PHASES 1A & 1B
15
MATTHEW PERZA
SHEET
N
BAYHEALTH MEDICAL
SCULL
14

AC
SWP
TM: 02-05-077.09-05-7101-000

SCULL TERR C-EX-PARKING-SPACE-NO-T PHASE 2B: DEMOLISH THE EXISTING PARKING GARAGE AND CONSTRUCT A THREE-STORY SURGERY CENTER. CENTER, INC C-202 MASTER PLAN PHASES 2A, 2B & 2C C-001 X DEED: D 8452/199

PRIVATELY MA

PARKING

OZ PHASE 2C: CONSTRUCT A THREE-STORY EMERGENCY DEPARTMENT EXPANSION. TM: 2-05-077.13-01-5100-000 ZONING: R8 24x36

DEED REF.: D 12603/324

13
0.13 AC. C-203 MASTER PLAN PHASE 3 24x36

PHASE 3: DEMOLISH THE EXISTING LEGACY BUILDING UPON THE COMPLETION OF ALL THE NEW FACILITIES. X ZONING - IO 433 SPACES 11 L-101 LANDSCAPE PLAN COPYRIGHT 2025 Xref- FIP

Bayhealth MP - C-001 - 24x36-60 - 2025-11-19
51

Engineers Signature - Seal Frozen 1998 F:\AutoCAD\Projects\2019\2019184-43\DWG\2019-184-43-BayHealth-Dover-Master.dwg, Dec 04, 2025 - 3:34pm

AINED

184-H INT

oly-C
24x36 24x36

ross XX-XX-XX 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

Página 52

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

24x36 24x36

Item 3.

LEGEND C-1-Notes-Legend-Landscape
FIRE MARSHAL NOTES 2019-184-18-Fire-Marshal-Notes
GENERAL NOTES: GENERAL NOTES: 2019-184-50-MP-Notes-C-001

24x36 24x36

ITEM EXISTING PROPOSED ITEM EXISTING PROPOSED 1. FIRE LANES MUST BE PROVIDED AND MARKED IN ACCORDANCE WITH THE DELAWARE STATE FIRE 1. THE BOUNDARY & TOPOGRAPHIC DATA SHOWN HEREON WAS COMPILED FROM A FIELD SURVEY 10. BEFORE THE CONTRACTOR CAN BEGIN CONSTRUCTION HE MUST OBTAIN THE PROPER PERMITS AND/OR CONCRETE CURB & GUTTER SANITARY GRAVITY SEWER LINE (S) EX. 10"S 10" S PREVENTION REGULATIONS. PERFORMED BY BECKER MORGAN GROUP, INC. , DOVER, DE. IN APRIL 2020. PROJECT VERTICAL DATUM IS APPROVALS FROM THE CITY OF DOVER (C.O.D.), DELAWARE DEPARTMENT OF NATURAL RESOURCES SIZE & FLOW DIRECTION BASED ON NAVD 88 AND PROJECT HORIZONTAL DATUM IS BASED ON DELAWARE STATE PLANE (NAD83), (D.N.R.E.C.), DELAWARE DEPARTMENT OF TRANSPORTATION (DELDOT), CITY OF DOVER DEPARTMENT OF CONCRETE SIDEWALK, SLAB / PAVING 2. ANY GAS FIRED HVAC EQUIPMENT MUST BE EQUIPPED WITH EMERGENCY CUT OFF SWITCHES REMOTELY SANITARY SEWER FORCE MAIN (F.M.) GPS DERIVED FROM N.G.S. CONTROL MONUMENTS. PUBLIC WORKS, CITY OF DOVER DEPARTMENT OF PUBLIC UTILITIES AND APPROPRIATE STATE AND 24x36

EX. 10" F.M. 12" F.M. LOCATED. 24x36

IMPERVIOUS SURFACED ROAD, DRIVE SIZE & FLOW DIRECTION 2. THE BOUNDARY LINES PORTRAYED HEREON HAVE BEEN ESTABLISHED BASED SOLELY ON PHYSICAL COUNTY AGENCIES. OR PARKING LOT 3. ADDRESS NUMBERS OF AT LEAST 12 INCHES IN HEIGHT MUST BE PLACED ON THE STREET SIDE OF THE SANITARY SEWER MANHOLE (S.S.M.H.) EVIDENCE DISCOVERED IN THE FIELD IN CONJUNCTION WITH DETERMINATIONS DERIVED FROM SOURCE OF 11. ALL CONSTRUCTION METHODS AND MATERIALS SHALL BE ACCORDANACE WITH THE CITY OF DOVER INDIVIDUAL TREE OR BUSH N/A BUILDING VISIBLE FROM THE STREET. TITLE AND ADJACENT DEED RECORD INFORMATION. DEPARTMENT OF PUBLIC UTILITIES CONSTRUCTION STANDARDS AND SPECIFICATIONS AND THE STATE OF EVERGREEN DECIDUOUS DELAWARE CONSTRUCTION STANDARDS AND SPECIFICATIONS. 24x36 SANITARY SEWER CLEANOUT (C.O.) 4. ANY NATURAL OF LP GAS BOTTLES, METERS, REGULATORS, ETC. MUSH HAVE IMPACT PROTECTION. 3. ALL UTILITY LOCATIONS AND SIZES SHOWN HEREON ARE EITHER MARKED LOCATIONS IN THE FIELD, 24x36

WIRE FENCE X X X X X X

WATER MAIN & SIZE EX. 10" W 12" W VISIBLE AND FIELD LOCATED STRUCTURES OR TAKEN FROM UTILITY MAPS PROVIDED BY UTILITY 12. ALL FIRE LANE DEMARCATION AND FIRE LANE SIGNS SHALL BE IN ACCORDANCE WITH ALL THE STATE FIRE CHAINLINK FENCE 5. THE PROPOSED BUILDING MUST BE PROTECTED BY A FULL AUTOMATIC FIRE SPRINKLER SYSTEM. PROVIDERS. HOWEVER, LACKING EXCAVATION, THE EXACT LOCATION OF UNDERGROUND FEATURES PREVENTION REGULATIONS. STOCKADE FENCE FIRE HYDRANT (F.H.) F.H. F.H. 6. A STANDPIPE SYSTEM MUST BE PROVIDED IN THE PROPOSED BUILDING. 24x36

WATER VALVE (W.V.) OR METER (W.M.) 4. CANNOT BE ACCURATELY, COMPLETELY AND RELIABLY DEPICTED. THE AREA OF DEVELOPMENT SHOWN HEREON IS NOT IMPACTED BY THE 100 YEAR FLOOD ZONE AS SHOWN 13. EASEMENT AGREEMENT WITH AND FOR THE BENEFIT OF HOLY CROSS CHURCH FOR PURPOSE OF INGRESS AND EGRESS ACROSS LANDS OF KENT GENERAL HOSPITAL, INC. (P. 51.00) SHOWN HEREON, IN DEED BOOK ARCH I T E C TURE 24x36

  • 7.THE FIRE DEPARTMENT CONNECTION FOR THE SPRINKLER/STANDPIE SYSTEM MUST BE OF THE 5 INCH STRUCTURE (CONCRETE, WOOD, METAL, ETC.) W.M. W.V. W.M. W.V. STORZ WITH A 30 DEGREE ANGLE AND STRAINER. THE FIRE DEPARTMENT CONNECTION MUST BE LOCATED ON KENT COUNTY, DELAWARE FIRM MAP 10001C0169J, PANEL 169, REVISED JULY 7, 2014. PORTIONS OF O47 PAGE 063 DATED JANUARY 30, 1987 AND RECORDED IN THE KENT COUNTY OFFICE OF RECORDER OF DEEDS. ENG I NE E R I NG STORM DRAIN MANHOLE (S.D.M.H.) WITHIN FIFTY (50) FEET OF THE MAIN ENTRANCE IN AN AREA APPROVED BY THE FIRE MARSHAL. THE OVERALL PROPERTY ARE LOCATED WITHIN ZONE "AE", AREA OF MINIMAL FLOOD HAZARD. DRAINAGE DITCH OR SWALE 24x36

STORM DRAIN LINE (CMP, RCP, HDPE) 8. THE PROPOSED BUILDING MUST BE PROTECTED WITH A FULL FIRE ALARM SYSTEM WITH VOICE 5. WETLANDS SHOWN HEREON WERE FIELD LOCATED BY BECKER MORGAN GROUP, AS DELINEATED BY 14. THE SUBJECT SITE IS WITHIN A DOWNTOWN REDEVELOPMENT TARGET AREA AND THEREFORE, EXEMPT Dover, DE 24x36

WETLAND BOUNDARY LINE N/A BY WATERSHED ECO, LLC. THE AREA OF DEVELOPMENT SHOWN HEREON IS NOT IMPACTED BY FROM THE REQUIREMENTS AND RESTRICTIONS OF THE SOURCE WATER PROTECTION OVERLAY ZONE

VVVEVACUATION.309 S. Governors Ave.
FRESHWATER WETLANDS.(SWPOZ), TIER 3 - EXCELLENT RECHARGE AREA.
CONTOUR4955CATCH BASIN (C.B.)Dover, DE 19904
9. BOTH THE FIRE ALARM AND SPRINKLER SYSTEMS MUST BE MONITORED BY AN APPROVED METHOD. 6. ALL ROADS, PARKING AND OTHER PAVED AREAS WILL BE PRIVATELY OWNED AND MAINTAINED AND ARE 15. THE IMPROVEMENTS SHOWN FOR THE PROJECT SITE ARE NOT LOCATED WITHIN THE SOURCE WATER
ELEVATION SPOT SHOT 43.55 25.50 T.C. UTILITY POLE W/ OVERHEAD SERVICE NOT INTENDED FOR DEDICATION. PROTECTION OVERLAY ZONE (SWPOZ), TIER 1 - SECONDARY WELLHEAD PROTECTION AREAS. Ph. 302.734.7950
25.15
24x36

25.00 B.C. (TELEPHONE (O.T.), ELECTRIC (O.E.)

  • 16.PARCEL NUMBER: 02-05-077.13-01-4800-000 WAS PREVIOUSLY SUBMITTED TO THE PLANNING COMMISSION Fax 302.734.7965 24x36

BENCH MARK 7. DELAWARE REGULATIONS PROHIBIT THE BURIAL OF CONSTRUCTION DEMOLITION DEBRIS, INCLUDING N/A UNDERGROUND ELECTRIC (U.E.) U.E. TREES AND STUMPS ON CONSTRUCTION SITES. ANY SOLID WASTE FOUND DURING EXCAVATION MUST BE AND CITY COUNCIL (APPLICATION Z-25-01) FOR REZONING OF THE PARCEL TO IO - INSTITUTIONAL & OFFICE. PROPERTY OR RIGHT-OF-WAY LINE U.E. ON NOVEMBER 10, 2025 THE CITY COUNCIL GRANTED THE REZONING PER ORDINANCE #2025-15 Salisbury, MD REMOVED AND PROPERLY DISCARDED. UNDERGROUND TELEPHONE (U.T.) U.T. U.T. 24x36 CENTERLINE 8. ALL ACCESSIBLE PARKING DEMARCATION, STALLS, AND BUILDING ACCESSIBLE ROUTES SHALL COMPLY 17. THE PROPERTY WAS SUBMITTED TO CITY OF DOVER ZONING BOARD OF ADJUSTMENT (BOA) 312 West Main St. Suite 300 24x36

LIGHT POLE

UNDERGROUND GAS MAIN (G) EX. 2" G 2" G WITH THE "AMERICANS WITH DISABILITIES ACT". (APPLICATION NO.: V-25-05) REQUESTING TWO VARIANCES. THE FIRST WAS A VARIANCE FROM THE 150' Salisbury, MD 21801 9. THIS DRAWING DOES NOT INCLUDE NECESSARY COMPONENT FOR CONSTRUCTION SAFETY. ALL HEIGHT RESTRICTION TO ALLOW THE BED TOWER TO BE CONSTRUCTED TO A MAXIMUM HEIGHT OF 175'. Ph. 410.546.9100 CONSTRUCTION MUST BE DONE IN COMPLIANCE WITH THE OCCUPATIONAL SAFETY AND HEALTH ACT OF THE SECOND WAS VARIANCE FROM THE 10' SETBACK LINE ALONG SOUTH STREET TO ALLOW THE Fax 410.546.5824 24x36

1970 AND ALL RULES AND REGULATIONS THERETO APPURTENANT. PROPOSED BED TOWER TO BE CONSTRUCTED OVER THE SETBACK LINE. THE BOARD OF ADJUSTMENT 24x36

GRANTED APPROVAL OF BOTH VARIANCE REQUEST DURING THE PUBLIC HEARING ON OCTOBER 15, 2025. Wilmington, NC 00-00001 T.P.: 2-05-07713-01-25 8 13 1.99 ACRES 3205 Randall Parkway, Suite 211 24x36 Wilmington, North Carolina 28403 24x36

Ph. 910.341.7600
Fax 910.341.7506
X X X
24x36
9
8
13
www.beckermorgan.com 24x36

LANDS N/F X

HOLDEN LEASING, LLC13
TM: 02-05-077.13-01-4000-0008X
DEED: D 4274/26XLANDS OF
ZONING: C3BAYHEALTH MEDICALX
24x3624x36

1.35 AC. EXISTING ONE STO

RY LANDS OF

X BRICK BUILDING . BAYHEALTH MEDICAL CENTER, INC

AVE

20 560 GOVERNORS -000 TM: 02-05-077.13-01-2500-000 X

T.P.: 2-05-07713-01-2501 1.75 ACRES CENTER, INC 2.00 AC. LANDS N/F TM: 02-05-077.13-01-2501-000 DEED: D 47/177 LANDS OF MENTOR PROPERTIES 1, LLC X 1.75 AC. 9 ZONING - IO 24x36 BAYHEALTH MEDICAL TM: 02-05-077.13-01-4200-000 DEED: D 947/177 24x36

28CENTER, INC.DEED: D 8681/27ZONING - IO
TM: 02-05-077.13-02-0100-000ZONING: C39
DEED: V 48/146100.0.26 AC.10
LANDS N/F
00
R.O. '
28LANDS N/FLANDSSTORN/FY BLDG.
2NATURALE ENTERPRISES, INC.
ZONING: IOJCD PROPERTIES, LLCEXISTING ONE
JCDBAYH
PROPERTIES, HUMAN RESOURCELLC
24x36

N 03 W.
EALTH
600 GOVERNOR
S AVE. TM: 02-05-077.13-01-1700-000 24x36

0.91 AC. TM: 02-05-077.13-01-4300-000 TM: 01 4400 000 02-05-077.13-01-4400-000 ° 32 S. G T.P.: 02 05 07713 0.77± ACRE S DEED: H 36/256 ' 40" DEED: D 3418/95 DEED: D 3418/95 ZONING: IO HOPE STREET 5 E ZONING: C3 ZONING: C3

PARKING OVE 0.87 AC. 0.77 AC. 12

24x36
X
X
23 RNO 9
24x36

X 168 SPACES RS C-EX-L-SHRUBS C-EX-L-TREE

C-PR-L-TREE-PS

AVE RADIUS: 1004.93' . C-PR-L-TREE-PS C-PR-L-TREE-PS

24x36
X VAN
ARC LENGTH: 279.86'
FIRE
24x36

X CHORD BEARING: N 4° 26' 02" W

VAN

CHORD LENGTH: 278.96'

X
477.
X 36'
17'
63.00'
24x36 24x36

9

9668.
LANE
5
R.O.W.
X8

9
24x36 24x36

6 11

WATER STREET

N .
FIRE LANE
LANDS OF
24x36

10 24x36

BAYHEALTH MEDICAL CENTER, INC
T.P.: 02-05-077.13-01-5200-000 10
S. B
CATH
PO

LAB NO

12.1226 AC. PARKING

78EXISTING
FIREEXISTING
24x36

R ADF DEED REF.: D 5149-337 ZONING - IO LANE

C-PR-L-TREE-CV

ONE STORY

BRICK BUILDING

CENTRAL SERVICES 10 24x36

ORD EXISTING C-PR-L-TREE-CV

50.00'
567
7,700 S.F.
BUILDING
FOOTPRINT: 20,800 S.F.
X

ST. BAYHEALTH - KENT CAMPUS AMBULANCE F.F. ELEV.: 22.16'

TRE

24x36

ER ENTRANCE R.O.W. X 24x36

EXISTING 3 STORY BRICK BUILDING10
FOOTPRINT : 151,500 S.F.X

ET

RAMPRAMP
710

N 73° 21' 04" E
24x36 DUMPSTER 24x36

COURTYARD

X PROJECT TITLE

EXISTING VAN DOCK SERVICE

PARKING GARAGE YARD

BAYHEALTH

HOP

X
TRUCK DOCK 1
EXISTING ROOF TOP
24x36

HELIPAD FOOTPRINT: 28,800 S.F. 10 24x36

X X
FIVE FLOORS - 371 SPACES TRUCK DOCK 2
X X
MEDICAL
E S
COURTYARD FIRST FLOOR ELEV.: 29.83' X
TRUCK DOCK 3 X

24x36
14"

DUMPSTER

X
LANDS OF
BAYHEALTH MEDICAL
CENTER, INC 24x36

COMPACTOR

CENTER, INC.
PO
TM: 02-05-077.13-03-6400-000
8 X
DEED: 11644/304
24x36

EXISTING BRIDGE 5

X
ZONING: IO KENT CAMPUS 24x36

24x36
4 PO
PO
PO
PO
PO
PO
PO

SITE DEVELOPMENT 24x36

X
MASTER PLAN
PO

PO PO

32

SOUTH STRE

COURTYARD X

29COURTYARD
24x3624x36

LK

X2005024-LARSON-B
35640 S. STATE STREET
10
EXISTINGX
CITY OF DOVER
6 STORY TOWEREXISTING16
24x3624x36

WELCOME 35 LANDS OF

2004 - 3 STORY EXPANSION CENTER

F.F.: 29.60'PODIUM BUILDINGBAYHEALTH MEDICALKENT COUNTY, DELAWARE
12"
X
CENTER, INC
1986 ADDITIONSHEET TITLE
W
TM: 02-05-077.13-01-1800-000
24x36
EXISTING FIREDEED REF.: D 2750/94X24x36
COMMAND CENTER36
N 87
16ZONING - IO
° 03'36
SOUTH STREETX
EXISTING
24x36

PARKING X

CONDITIONS 24x36

24x36
ET 31

32
462 SPACES
X 24x36

3
X
C-PR-L-TREE-AR

5XXX
2XXX
FIPCXX
24x3624x36
733
13X
8
C-PR-L-TREE-PS

C-PR-L-TREE-PS

33

38X
24x36
4124x36
36
579.0
6'8
31X03060120
6

24x36
1 EXISTING 24x36

629ONE STORYX
BRICK BUILDINGDo Not Explode - Select Scale
EX. TW
6,200 S.F.
560
FRAME STORY
D HOU
SE
XSCALE: 1" = 60'
24x36
EX. TWO STORY50.00'24x36
BRICK HOUSE3
(OFFICE)R.O.W.5ISSUE BLOCK
60.00X
'20
R.O.
W.

658.85'
24x36
LANDS OF X 24x36

S 01 BAYHEALTH MEDICAL CENTER, INC LANDS N/F

X ° 34' EX. 3 STORY

34" W PROPERTY LINES TM: 02-05-077.13-01-4800-000 BAYHEALTH MEDICAL BRICK BUILDING et-Commons 2005-198-State-Stre X CENTER, INC. INT TO BE EXTINGUISHED 1.0053 AC. TM: 02-05-077.13-01-1801-000 7,200 S.F. FOOTPR . 24x36 X ZONED: IO 530 S. STATE ST PLATBOOK: 27-00018 X 24x36

LANDS N/F

CHURCH OF THE HOLY CROSS S. S PROPERTY TO BE ZONING: IO

1.30 AC. TAT X TM: 02-0-077.13-01-5600-000 CONSOLIDATED TS DEED: Q 20/165 E S FCM TRE 24x36 24x36

X ZONING: IO

X
11.3 AC.
ET 70.00' .
. . .
24x36

R.O.W RADIUS: 1402.69' 60.00'

24x36

X . MARK DATE DESCRIPTION

ARC LENGTH: 402.65'
R.O.W.
LAYER STATE: C-101MP
CHORD BEARING: S 6° 18' 06" E

XCHORD LENGTH: 401.27'PROJECT NO.:2019184.50
24x3624x36

DATE: 2025-12-04

X
SCALE: AS SHOWN
FCM
Do Not Explode

  • •Select Scale

DRAWN BY: M.A.R. PROJ. MGR.: M.A.R

24x36 24x36

X
16
LANDS N/F
N
VA LANDS N/F 15
MATTHEW PERZA
14
SHEET

AC
BAYHEALTH MEDICAL
SCULL TM: 02-05-077.09-05-7101-000

SCULL TERR C-EX-PARKING-SPACE-NO-T X CENTER, INC DEED: D 8452/199

INT

PRIVATELY MA

PARKING

24x36

X
TM: 2-05-077.13-01-5100-000
DEED REF.: D 12603/324

ZONING - IO433 SPACES
11
13ZONING: R8
0.13 AC.
C-100
COPYRIGHT 2025
24x36

FIP 52

Bayhealth MP - C-001 - 24x36-60 - 2025-11-19 F:\AutoCAD\Projects\2019\2019184-43\DWG\2019-184-43-BayHealth-Dover-Master.dwg, Dec 04, 2025 - 4:18pm

AINED

24x36 24x36

XX-XX-XX

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

Página 53

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

Ex. U COMM.
24x36 24x36

Ex. U COMM.
1-2501-000
P.

T.P.: 2-05-07713-0
C.
R.
Ex. W
5" Item 3.
.1

1.75 ACRES

EX. C

24" OUT: 14.52'

X Ex. H Ex. S X A T ER .B. GRA .V.U.E . EX Ex. STREET LIGHT RIM AN. M H. T INV. E: 29.5 E ELEV.: 72.25' 8" IN L.: 30.8 12

IN: 2'3: 22.35'
INV.7W.VHEIGHT: 41.50'±
IN: 2 .36'.10
" IN5'
INV.7
OUT .58'W.V10" O : 17.85'
12

. UT: 17
MD:

: 27.3 .85'
W.V.
24x36 .
3' 24x36
MD:

EX

TTEx. 1Ex. STREET LIGHT
12MD:

F.H.
"R
EX. C
.B.

152" WTOP ELEV.: 72.80'
GRAATE
Ex. G
.
R
.C
12

INV.: TE: 29.8 P.
F.H. HEIGHT: 41.50'±
R
SEWE

27.350'
AS
'EXISTING
C-EX-U-Sewer-MH

4'ID

FCM 12

"W ELECTRIC METER

STORY BLDG.
12

EXISTING ONE

Ex. CAMERA POLE E x. 6
ELEC
TRIC

AN RESOURCE

24x36 12
24x36

TOP ELEV.: 56.14'
M
BAYHEALTH HU ORS AVE.
.P. W.V
.
HEIGHT: 25.65'± " R.C
12

600 GOVERN W.V

C.O.D. H.V.U.E. - UT DUCT 6

EX. .
3 01 4400 000
Ex. C
12

15 Ex. SD. C.B. .B.: UE T.P.: 02 05 0771 EX. S GRA RIM D. M .H. T 15" IN E: 30.52 Ex. GAS 6" W GRATE: 17.93' 12

'
8"S
0.77± ACRES
V: 29
INV. EL.: 30.6
6

6

.1 0'
IN: 2 4'
7.44' 18" IN: 14.95'
6

INV. Ex. C
12

24x36 24x36

OUT .B.: Ex. S : 27.2 9' GRA W.V Ex. RIM AN. M Ex. Ex. 10"S T H.: 1 15" IN E: 29.89 8" IN L.: 31.6 E B . 12

V: 27 ' : 1'*
.81' 6" IN 23.30'
UE Ex. H
W.V. Ex. SAN. MH.

Ex. 6" W
.V.U 8" OU : 23.16'

  • S.G 12

.E
Ex. SD. CB
Ex. SAN. MH.
. T: 23
MD:

RIM EL.: 23.36' .16' MD:

GRATE: 31.04' Ex. STREET LIGHT
W.V. RIM EL.: 23.59' Ex. COMM. MH.
8" IN: 17.36'
12

MD:

12" INV.: 27.29'
ARCH I T E C TURE
OVE
TOP ELEV.: 73.60' RIM: 23.06'
8" IN: 15.10' 8" OUT: 17.26'
12

WHEIGHT: 41.50'±8" OUT: 15.00'
66

24x36 24x36
6
4

EX UE .P. UE W.V

RNO 6

Ex. 15" R.C F.H.
ENG I NE E R I NG
.
12

Ex.

.1F.D.C. .
2"G.M
4"
D
C-EX-L-SHRUBS
C-EX-L-TREE

.I.P
6

. 32
6
12

Ex. 6"S Ex. 6"S Ex.
C-EX-U-SEWER-MH-4ID-C

Ex. COMM. MH.
W W.M. C.O.
C-EX-U-SEWER-MH-4ID-C

"W
C-EX-U-SEWER-MH-4ID-C

STORM

RS
SEWER

G
G.V. 12" Ex. 6" WATER
SEWER

Ex. 6"S
SEWER

W.V.
C-EX-U-SD-MH-4ID-E

4

RIM: 19.76' WAT 12

WATER ~

T c Dover, DE
Ex. Ex. 6 E R

Ex. 12" S.D.
C-EX-U-Sewer-MH
4'ID

C-PR-L-TREE-PS

8"

AVE SEWER

S.D
E W.V
6
12

W.V. Ex. SD. C.B.
. .
Ex. U COMM.
24x36
C-PR-L-TREE-PS C-PR-L-TREE-PS

31 24x36

Ex. H Ex. U COMM.
R

Ex. GAS
SEWE

GRATE: 19.39' .V.U 12 TELEPHONE TELEPHONE

Ex. C.B.: 10A
309 S. Governors Ave.
.
.E.
C-EX-U-Sewer-MH
4'ID

4

Ex. 4
Ex. U COMM.

FIRE
VAN
GRATE: 30.45'
"G
12

Ex. 8" S.D.

Ex. SAN. MH.6
Ex. SAN. MH.Ex. SAN. MH.Ex. S.D. MHEx. SD. C.B.UE3224" INV: 20.95'SEWER

G Dover, DE 19904
CDE-UG
RIM EL.: 31.61'
12

RIM EL.: 31.75' RIM EL.: 31.75' G

C-EX-U-Sewer-MH-4ID-E

RIM EL.: 31.76' FIP 6

GRATE: 30.90'* EX. C.B.: 18A

Ph. 302.734.7950
6

31 6" IN: 24.45' 6" IN: 22.73' 12" IN: 22.30' Ex. 10" C-EX-U-Sewer-MH-4ID-E

SEWER

8" IN: 22.35' S 4 12

.C.P
Ex. GRATE: 28.63'
F.H. 19
6" GAS
. 6" OUT: 21.55' 6" OUT: 22.71' 15" OUT: 22.22' 12"
Ex. SD. MH
Fax 302.734.7965
VAN

Ex. U COMM.
W 12" IN: 25.03'

Ex. 6" W
24x36
"R 24x36
12

ExRIM: 31.78'15" IN: 21.88'2120
. 12Ex. SD. CBEX. SD. CB12

EX. 3" GAS

UE15" INV.: 20.08'3022
Salisbury, MD
Ex. C.B.: 14A3115" OUT: 20.73'6" GAS
23
GRATE: 31.01'GRATE: 31.49'GRATE: 29.26'*
12

24 21

Ex. 6" W
15" INV.: 20.76' 12" OUT: 4
R
SEWE

15" IN: 25.91'* ELECTRI C

W.V. 26 Ex. 3" GAS
G.V.
ER

W.V.
3" GAS
SEW

23
Ex. 10"S
C-EX-U-Sewer-MH

TELEPHO 12

Ex. C.B.: 9A
4'ID

NE
ELECTR

22
20
IC
6

Ex. LIFT STA.: #1 26
C-EX-U-Sewer-MH
4'ID

30
312 West Main St. Suite 300
21
6

24

Ex. 6"S
Ex. ROOF Ex. S.D. MH 31
12

RIM: 31.26'Ex. SAN. MH.
ELECTRI
C
GRATE: 28.13'2625
Ex. C.B.: 8A-1

LANE

24x36 24x36

ELEV.: 47.90'±

Salisbury, MD 21801
RIM EL.: 31.11'* 24" INV: 20.20' 22
12

RIM EL.: 30.77'*

2321
HEIGHT: 16.2'±8" IN: 22.38'8" IN: 23.37'W.M.GRATE: 27.75'Ex. C.B.: 8A
24
FIRE
R
12

SEWE

31
8" OUT: 23.27'
Ex.
Ex. SD. CB 15" OUT: 19.80' GRATE: 28.24' 27
Ph. 410.546.9100
C-EX-U-Sewer-MH
4'ID

8" OUT: 22.27

Ex. UUT
26
22 21 Ex. 12" W
12
4

12

30
GRATE: 30.71' EX 23
12

EX. SD. C.B. 30 24" INV.: 19.50' 12

E 24
12

W.V. Fax 410.546.5824
Ex. ELEC. MH
10
12

20
GRATE: 28.27'*
12

Ex. ELEC. MH
.8
12

W
21
12

25
EExx.
.V
RIM EL.: 31.73' 20
12

3" GASEx. 12" W
12" IN: 24.74'*
2722
12

RIM EL.: 31.64' 8

.
Ex. 12" W
12

19
"S W.V. 26 W.V.
12

W.V.
8" IN: 23.77'*
. UUT 23
12

Ex. 15" R.C.P.
12

Ex. COMM. MH.
6

12

15" OUT: 23.7'*2

Wilmington, NC
Ex. ELEC. MH

2624
1212

24x36
6

24x36

29 E RIM EL.: 31.78' Ex. H
W.V.
12

"W
SOD-MD

25
Ex. U 23
2

Ex. SD. CB .V.U
12
12

RIM EL.: 31.56' 30 FIP 12

.E.
12

Ex. C.B.: 15A
12

Com
12

Ex. 1

R.C.P30Ex. 24
W.V.24
4

.

GRATE: 30.58'GRATE: 28.29'*
Ex. C.B.: 12AEx .0
m.
" R.C
.P.
15" OUT: 25.12'*24

Ex. H.V.U.E. Ex. H.V.U.E.
3205 Randall Parkway, Suite 211
29
10

12" INV.: 27.67' 2" 26 23

25
Ex. UT
Ex. 24" R.C.P.
8

UE

15"GRATE: 28.17'*W
Ex. UT
Ex.4" GAS23
8

26
F.H. Ex. UUT
24
2

15" IN: 22.62'*22
Ex. C.B.: 13A
Wilmington, North Carolina 28403
EX.3026
Ex. 6" W
6
15" IN: 22.62'*23
GRATE: 27.94'*E2929
6
Ex. 4" W21
F.H.Ph. 910.341.7600
10

W.V.
4 4 4

P.
15" OUT: 21.60'*
24x36 24x36
8

15" IN: 23.95'* " R.C.
T
Ex. U
2

Ex. 12" R.C.P. EXISTING 24
6

29
Ex. FIRE PUMP F.D.C. Ex. 15" IN: 23.99'* LIGHT POLE Ex. 24"
Ex. 15
Fax 910.341.7506
15" R.C.P.
Ex. 6"S
29 Ex. H.V.U.E.
8

R.C
C-EX-U-Sewer-MH
4'ID

F.D.C.
.P. 15" OUT: 22.80'* Ex. 15" R.C.P. 20
10

SEWER

LANE

P M Ex. SAN. MH.: 3B
28

FIRE

G.V.
Ex. 15" R.C.P.

Ex24
Ex. SAN. MH.
Ex. UT
www.beckermorgan.com
RIM EL.: 29.45'FCM21
Ex. 8"S
.1Ex. 24" R.C.P.25
C-EX-U-Sewer-MH-5ID-E

4'ID
C-EX-U-Sewer-MH

SEWER

RIM EL.: 29.11'* 5"

Ex. WATER METER
10

SEWER

R
Ex. SAN. MH.: 2B 8" IN: 24.83'
Ex. UE
8

6" IN: 23.68'.C
.P
Ex. 8" WFIRE28
6"
8" OUT: 23.58'"PRIM EL.: 28.62'*.Ex. 15" R.C.P.
24x36
VC298" OUT: 24.63'Ex24x36
66666

TELEPHONE

8" IN: 24.62' .2
4"
24

Ex. 15" R.C.P.
W.V.

8" SR.C
12ELECTRIC

8" IN: 24.13'
SS-5B
8

Ex29ELECTRIC
Ex. COMM. MH..P.
.
SS-3B
.
8" OUT: 24.03'

Ex.6"S
P RIM EL.: 28.45' 25
C.
R.
MD:

CATH

" W.V. 6" SEWER C.O. 12 C.O. Ex . 28 24 Ex. SD. LAB C.B. INV.: 24.40' NO C.O. 10

Ex. ELEC. MH 25
8

Ex. 15" R.C.P. Ex. LIGHT POLE
6"

GRATE: 28.30'25
Ex. C.B.: 16APARKINGRIM EL.: 28.45'

EXISTING ELEV.: 52.90'

Ex. 6"S
8" IN: 23.20' F.D.C. HEIGHT: 28.00'±

Ex. UE
Ex. SD. M.H. FIRE
DECON

Ex. UT EXISTING
8

GRATE: 29.26'

24x36 24x36

Ex. G
INV.: 23.16' 29 Ex. C.B.: 7A
8" OUT: 23.10'
ONE STORY
24

CENTRAL SERVICES
RIM EL.: 32.84' 15" IN: 23.35' LANE GRATE: 24.75'
AS
C.O.
6"

EX. 15" OUT: 23.35' 24" INV.: 19.05' 25

Ex.6"S
10

15
G
BRICK BUILDING
" R.C
.P. INV.: 25.00'
8

BUILDING

Ex. C.B.: 20A
C-PR-L-TREE
-CV

EExx.
C-EX-U-SD-MH-5ID-E

STO

GRATE: 28.75' RM

FIP

567
INV.: 24.83' 12" OUT: 26.20' 25 24
. UUT
Ex. 12" PVC
8

24x36
OE E 24x36

SEx.. 10"B
W.V.

7,700 S.F.
G
STORM
PS

.D Ex. C.B.: 11A
5" S FOOTPRINT: 20,800 S.F.
C-PR-L-TRE

EXISTING E-CV

Ex. C.B.: 19A

Ex. 1
S R
C.O. F.D.C.
Ex.
GRATE: 28.85'
8

C.O.D. H.V.U.E.
ADF
GRATE: 28.85'

BAYHEALTH - KENT CAMPUS

EX. L2524
F.F. ELEV.: 22.16'
D24
IFT S8"
15" IN: 21.20'12" OUT: 26.50'
RIM:
33.20 TA. NO. 2AMBULANCE
ORD
.I.P
.
12" IN: 21.75'
Ex. 12" RD
30

Ex. 24" R.C.P.
.

G ' 24 25
ER ENTRANCE

4 WATER

C.O.24" OUT: 21.20'30
2424

Ex. 28"
ST. EXISTING 3 STORY BRICK BUILDING
29
INV.: 28.55'
EX. SD M.H.
24x36 24x36

EX. 1224
" R.C.P
.GRATE: 33.14'
Ex. SD. M.H.
8

INV.: 24.25'

  • •UT DUCT 28 RIM EL.: 33.14' 12" INV.: 28.55' FOOTPRINT : 151,500 S.F. Ex. C.B.: 15C GRATE: 28.40'* 6" SEWER C.O. INV.: 25.10' 24 25 Ex. OIL / GRIT 25 P. .C. T ER

C-EX-U-Sewer-MH
4'ID
SEW

Ex. 10 " S 8" IN: 24.70'* 8" OUT: 24.25'* INV.: 24.95' INV.: 26.50' Ex. C.B.: 21A GRATE: 28.19' SEPERATOR RIM EL.: 28.43' 27 26 24 25

TRE

12 Ex. 1,000 GALLON DECON TANK 15" OUT: 23.03' 8

24x36 24x36

"R 25
ER
SEW

EX. S

  • D.M 12" IN: 23.60' 25 25 24 C-EX-U-Sewer-MH

EXISTING 4'ID

10

RIMH.EX
INV. EL.: 32.6
.12" OUT: 23.60CONCRETE CURB
IN: 36'

E

INV.0
IN: 2 .20'EX. SOEEXISTING27
INV.8
OUT .81'
: 27.8R IM
AN. M
INV. EL.: 32
H.COURTYARDCONCRETE SIDEWALKEx. C.B.: 6A2324
5'
GRATE: 22.90'
EX. 8" D.I
IN: 2.7
5.38' 1'Ex. SAN. MH.
FIP
8

23
.P.
24" IN: 18.05'
10

RIM EL.: 32.67'

EXISTING23
24x3624x36

24" OUT: 10.65'

PARKING GARAGE EX. C

.B.10" IN: 25.86'262324
GRA
INV.: TE.: 32.5
30.881'W.V.F.H.10" OUT: 25.84'

HOP ' 23

FOOTPRINT: 28,800 S.F.
23
EXISTING ROOF TOP
8

Ex. SD. C.B. 23
10

2524
GRATE: 33.24'
HELIPAD
2825

FIVE FLOORS - 371 SPACES

E S
24x36

8" IN: 29.64'
24x36

Ex. 8" W
8

8

8" OUT: 29.34' W.V.
FIRST FLOOR ELEV.: 29.83'
23
24
COURTYARD
8

.
10

EX

8"Ex. C.B.: 17A
.P24
D.IGRATE: 27.85'
23
15" OUT: 24.35'
24x36
.
2222
24x36

10 8

2322
Ex. SD. CB22FIP
.
10" HPS (125#)

24x36
GRATE: 30.50'
12" INV.: 28.95' 22
22
22
4" PC

24" PCHWS 24" PCHWS

INV.: 12.67' INV.: 13.50'

DUMPSTER N 24x36

24" PCHWR 24" PCHWR INV.: 13.90' 10

8

COMPACTOR

Ex. SD. CB 22

GRATE: 33.60'21
12" INV.: 29.95'HPS INV 14.08'

EXISTING BRIDGE 10

PC INV 14.08' 8

24x36 24x36

"S10" HPS (125#)
Ex. SAN. MH.: 1C
4" PC
2120RIM EL.: 17.50'

Ex. 1 CHW INV 14.25' 8" IN: 14.00'

0
8" OUT: 13.00' INV.: 14.33'
Ex. SD. CB 24" PCHWS

GRATE: 33.50' 10

24" PCHWR 21 8

2121
12" INV.: 30.20'19
24x36
2124x36

21
R
SEWE

21
C-EX-U-Sewer-MH-5ID

10" HPS (125#) PO

21 21
19
F.D.C.
PO
10 4" PC

FDC F.D.C. 8

PO PO
18
18
24" PCHWS

SOUTH STRE 19 24" PCHWR

18.8
24x3620
Ex. UT21
20
191818Ex24x36
18PROJECT TITLE
COURTYARDEx. COMM. MH"S

C.O.D. H.V.U.E.
18
10

BAYHEALTH
RIM EL.:
COURTYARD 18
8

Ex. SD. CB1818
Ex. UT18
TELEPHONE1918
GRATE: 33.70'C.O.
TELEPHONE

" WA
INV.: 11.00'
12" INV.: 30.20' Ex. SD. MH: 24A 20
TER

MEDICAL

24x36

20 Ex. S.D.: J.B. RC 24x36

RIM EL,: 19.46' P 10

  • •UT DUCT 21 18 10" IN: 13.45' 8

W.V.
20

19TOP EL.: 15.95'8"
Ex. COMM. MH.48" INV.: 5.90'
Ex. 8F.H.
15" OUT: 11.34'.4
RIM EL.: 20.00'W.V.Ex

CENTER, INC INV.: 13.83' 8

18

INV.: 23.75' ±20
19Ex. C.B
INV.: 17.25'20
10

24x36
GRATE: 18.72' 24x36

EXISTING INV.: 24.30' ± 15" OUT:

6 STORY TOWER

Ex. C.B
EXISTING
Ex. C.B Ex. SD. MH: 25A C.O.

WELCOME EX. SAN. MH.: 7A 20 8

18

PODIUM BUILDING RIM EL.: 19.67' GRATE: 29.01 GRATE: 29.14' RIM EL.: 22.45'

Ex. UT
M
STOR

8" IN: 16.75'19
EX. S
CENTEREx. S.D.: J.B.
C-EX-U-SD-MH-5ID

AN. M 10

10" INV: 10" INV: 12" IN: 15.60' 8" OUT: 13.20'

2004 - 3 STORY EXPANSION RIM EL.: H.

KENT CAMPUS

30.0521" IN: 15.60'TOP EL.: 15.95'
F.F.: 29.60'
EX. SAN. MH.: 2A
'INV.: 16.10'
24" OUT: 15.60'Ex. C.B.: 5A18
RIM EL.: 19.45'48" INV.: 5.90'
1986 ADDITION
R
SEWE
24x3624x36

INV.: 23.61' INV.: 24.90' INV.: 20.05' 8" IN: 14.26 GRATE: 18.65' C-EX-U-Sewer-MH-5ID

INV.: 24.90' 10" IN: 12.84' 8

19EX. 15" RC
10" OUT: 12.44'24" OUT: 9.55'P17
19
171717

SITE DEVELOPMENT 10

INV.: 24.90'1917
1817

ET

W.M.1917
Ex. 8"SEXISTING FIRE1917EX. 12" RCP

Ex. 8"S
R
SEWE

C.O.20
19Ex. SD. M.H.: 4A
17
C-EX-U-Sewer-MH
4'ID

COMMAND CENTER W.V. INV.: 22.45'

MASTER PLAN

24x36
RIM EL.: 17.85'
8

24x36

EXIS T LIGH ING PAR

FDC28191824" IN: 10.00'17
T POC.O.25
K

Ex. 2" W
LE & ING LOT 21 24" IN: 9.10'
10
2

24
FIXT
URE

Ex. C.B29272623EX. SD. MH: 23A17
K
Ex. S.D. C.B.GRATE: 28.42'RIM EL.: 19.84'36" OUT: 9.10'
SIDE
228

15" IN: 14.40'

WALGRATE: 29.31'10" OUT:18
24" IN: 14.07'17
C.O.
Ex. SAN. MH.: 1A
.5
27" OUT: 10.40'
15" IN: 24.59'C.O.INV.: 20.71'
33
RIM EL.: 17.45'

Ex. 10"S
EX. 15" R.C.P.
24x36
ING 15" OUT: 24.34' 18
24x36

Ex. JB: 27A
10

12" IN: 12.15'
2

EXIS
T GRATE: 28.35'
STOR
M

W.V. 8

18
12" OUT: 12.05'
17

18Ex. CB: 2A
EX. SD. MH.1
C-EX-U-SD-MH-5ID

Ex. SD. C.B. 12" OUT: 21.00'
Ex. GRATE: 16.20' 640 S. STATE STREET
Ex. 8"S
Ex. 8" W
8

24 8

RIM: 29.13' 8

22
2

18
Ex. 10" DRAIN
23
GRATE: 30.42'
8
8
8
8

.C.18
2936" OUT: 8.55'
15" INV.: 26.17'
CITY OF DOVER
F.D21
0"S
4" IN: 29.10'2917S
18
STORM

Ex. C.B 18
PS
10

25 18
Ex.
54" x 48"

8" OUT: 25.49'

Ex. 5" DRAIN
26 18
24x36

GRATE: 28.00' 27 20

48" x 48"
8

15" 24x36

KENT COUNTY, DELAWARE

C-EX-U-Sewer-MH-5ID

29
8

19
Ex. 10"S
SEWER

18
FDC 12" OUT:
EX. SD. CB EX. SD. MH. 8"S 28
Ex. 10"S SEWER

Ex. 12"S17Ex.
GRATE: 28.62'RIM: 28.70'
C-EX-U-Sewer-MH-5ID-E

C-EX-U-Sewer-MH-5ID

F.D.C. F.D.C.
"S Ex. SAN. MH.: 6A Ex. C.B.: 3A
S
Ex. 10" SHEET TITLE
SEWER

15" OUT: 26.41' 15" OUT: 24.79' STOR

WAL

M C-EX-U-Sewer-MH-4ID-E

SE

29
ER
W
10

K RIM EL.: 28.70' GRATE: 16.65' 8

C-EX-U-SD-MH-5ID

Ex. 1
17
EX. SAN. MH.: 3A
33 Ex. 10"S 16
C-EX-U-Sewer-MH-5ID

C-EX-U-Sewer-MH-5ID

10" IN: 23.20'
Ex. UT
SIDE 15" IN: 13.75'
8
8

0
8

SEWER

RIM EL.: 22.55' W.V. SEWER

3216
10" OUT: 23.00'
F.H.
24x3624x36
10" IN: 19.03
36" INV.: 8.85'

EXISTING 28 32 .5

10" IN: 18.33'16
TINGEX. SAN. MH.: 4A
10" OUT: 18.13'
16Ex. C.B.: 1A
21
5RIM EL.: 24.84'17
22
1.
EXIS5288" IN: 23.74'201918GRATE: 16.00'
23
31
10
3RCP
10

48" STUB: 9.75' 32.5 10" IN: 21.68'

EX. 18"24
28
28
10" OUT: 21.48'
18FIPCEx. C.B.:161636" IN: 8.35'

UTILITIES PLAN 8

17
X
C-PR-L-TREE-AR

25X19XGRATE: 15.75'48" OUT: 5.78'
EX. 48"
R.C.P.XXX18
X15" OUT: 13.73'
Ex. SD. CBEx. C.BX
24x3624x36

EX. SAN. MH.: 5A

XXX2019
2620
29FIPCX
EXRIM EL.: 28.85'18
GRATE: 28.36'GRATE: 28.19'X2121
1717
32
W.VIS8" IN: 23.24'
10
.TI28222121Ex. C.B.: 28A
31NG10" INV.: 25.69'10" OUT: 25.04'27
10" IN: 22.39'
232219
10" OUT: 22.19'
2322GRATE: 18.25'
W.V.27Ex. C.B.: 29A
28.5
8

C.O.
Ex
21

Ex. UT
15" IN: 14.56'
F.H.W.V
.1
SI

.EXW27GRATE: 20.29'*2218
18" OUT: 14.56'
DE
2"
.820
28.515" OUT: 15.10'
23C.O.
S
"
AL
31.
I.
C-PR-L-TREE-PS

24x36
D. 24x36

32
EX. 15" R.C.P.
10

K
5 Ex. C.B.: 30A 19
C-PR-L-TREE-PS

P.

W.V.2821
X2928282322GRATE: 17.21'
29
8
FPK2815" OUT: 14.66'18
1717

30.5

EX. S3029 .52929292929
29
2828
EX. SD. MH: 26A
25222120191717
W.V
.
SEWE
R
IGN29
EXEX. S
M
STOR
GRATE: 25.70'23221717
AN. M281918Ex. SAN. MH.
10

EX .1
C-EX-U-SD-MH-4ID
C-EX-U-Sewer-MH

RIM 4'ID

. 15EL.: H.15" IN: 19.65'
8"2417
29
24x3624x36
EXIS"RR.28.54RIM EL.: 17.24'
.C.P'
SEWER

TING 12" IN: 19.65' C-EX-U-SEWER-MH-4ID-C

SIDEC.21
.P.23Ex. SD. M.H.15" IN: 2.66'
8

WAL

K2828Ex. C.B.: 31A15" IN: 19.44'
RIM EL.: 17.06'15" OUT: 2.56'
GRATE: 26.30'21" OUT: 17.87'18

Ex. 6"S
17
EX. S
29.5
29

29Ex.27241948" INV: 5.50'17
OE
AN. M2926 15". IN: 22.85'
RIM
EL.: H.28.10"S
10
2929Ex. CB: 32A26232117
31.75
'28
2815" 25
OUT: 21.20'20
5GRATE: 26.80'1717
28.5
C-EX-U-Sewer-MH-5ID

28
Ex. 29 28
26
24
SEWE

17
24x36 24x36
R

15" 15" OUT: 23.20' SEWER 8

R 29 27 18 17
Ex. C.B.:
SEWE

.C.P
C-EX-U-Sewer-MH

4'ID

R

. 29 19
Ex. 12" R.C.P.
C-EX-U-Sewer-MH

4'ID

Ex. 15" R.C.P.
10

17
EX. S

AN. MOUEXIS30Ex. 15" R.C
.P.INV: 24.50'2526262321GRATE: 15.75'
17Ex. C.B
12" R
INV.: P
C0204080
RIM15" R.C.P.:
10
EL.: H.TING
SIDE
29
13.86
30.99
'WAL
K
282626
2422GRATE: 16.44''Ex. C.B
29
10
EX. S18
D. M 26 Ex. C.B.: 18 12" INV: 13.64'
RIMH.
28.529201917GRATE: 17.12'
EX. TW
8

INV. EL.: 28.8 25 17

Ex. 10"S
10

IN: 25'
29Ex. SD. MH: 33AGRATE: 15.88'1712" INV: 13.97'
OU Ex.0
24x3624x36
Ex. GEX. S17Ex. C.B
FRAME STORY
EXIS521
2926
INV.
  • S.S IGN IN: 2 .39' 26 AS TING 10"S 29 RIM EL.: 26.67' 15" R.C.P.: 10
INV.5EX. S25
SWINOUT .39'2918
G GA: 24.7.D. M28
10". IN: 24.12'24GRATE: 16.08'
17
Do Not Explode - Select Scale
D HOU
RIMH.
2929
MD:

22
4.14'

TE1'15" R
FCMINV.:: 27.76'27
10

TAT
29.5
SCALE: 1" = 40'
EX. C 18 C 15" INV: 9.31'
10
R
SEWE

RIM:

.B.2926.17'12" OUT: 23.15'
26
27
SE19INV.: P
13.71
INV.: 27.78'2929
EX. TWO STORY'

E S
C-EX-U-Sewer-MH

26
4'ID

26

OU24.54
Ex. 6" WW.V.
8
EXIS'21
TING18
10

F.H. SIDE 29 27

27
17
MD:

Ex. SD. M.H.
3.24'

BRICK HOUSE EX. S WAL 28 24 20 W.V.

TRE

2826
AN. MK2722
W.V.
2929
10

RIM EL.: H.

24x3624x36
4" PVC
30.10292927RIM EL.: 16.58'19
18INV.: 14.75'

(OFFICE)
'
ISSUE BLOCK
E
25 15" R.C.P.: 12.87'
10

27 15" RCP

T
26 27 26 INV.: 9.31'
10

OU27262421
1718
EX. C2717
8

17

Ex. 8"S 17

.B.W.M2828
GRA22
10
.15" RCP
EXIS
TINGINV.: TE.: 29.21'18INV.: 9.48'

EX. 24" R.C.P.

SIDE25.052719
'2618
10

WAL 18 K

EOx. 127
262620
17
171818
U 0"S18
24x3624x36

24 21 17
10

EX. 12717
XF.H.10

Ex. 1

228
2825232322
17
18
0" W
8
" R.C272818
ATE272819
R
10

EX. C

.B..P.
282423
OU26

Ex. 48" RCP
GRA 27 27 21
INV.: TE.: 29.1
10

3' 28 27 27

Ex. 15" S
24.13
X ' 22 17 17 17
24
10

18
22
24x36 24x36

2827232018
10
R
SEWE28198

C-EX-U-Sewer-MH

4'ID

27

OU2621
28R
2522
10

C.O.D. H.V.U

X28ATE17
17
17
OE28
27
24
10

23
EX. 2 28 28 18 18
Ex. W
10

4" REX. S
.C.P.2119
AN. M
10
RIMH.
INV. EL.: 2822
EX. 1
OUFCM
2624
8

24x36

.7
24x36

2" R W.V.

Ex. WATER
10

IN: 2
1.8 1'
27

.E. - UT DU

CPEX. C
Ex. 120
XINV.:
25.63.B.8'S23
'GRA
2"S
10

18
Ex. GA

W.V.TE.:2218
.28.8027
F.H.
Ex. 8" W
W.V.
'2821
26
OE28272519
10
272418
28282827181818
2723
OUCT 18
.
10

X
10

2828W.M
. W226
8

EX. SAN. MH.
Ex. SAN. MH.
RIM EL.: 18.08' . . .
Ex. G
22 RIM EL.: 17.58'
AS 7W.V 15" INV. IN: 2.25'
24x36

FCM 10

. 21 19 12" INV. IN: 9.03'

12" INV. IN: 2.39'

24x36

MARKDATEDESCRIPTION
FCM
2012" INV. OUT: 8.34'
246" INV. IN: 13.48'
OU
23
2622
27262615" INV. OUT: 2.21'
10

X 25
27
10

EX. 2

4" R27272118C.O.EX. 6"SEx. UT
LAYER STATE: C-101MP
Ex. UT
.C.P.252219
UT
26
PROJECT NO.:2019184.50
20
FCM24
OEEx. UT
8

10

26

OU2424
23
21W.V.
22
4'ID

C-EX-U-Sewer-MH

25
10

X26
SEWER
W.V.
24Ex. 10" W
ExE.x.11
C.O.

DATE: 2025-12-04 12" RCP

UE
24x36 24x36

02"" W 25 OU 22 INV.: 15.64' 10

18

2119
WAATT23 Ex.OU
8
ERER24
12"S2019
W.V.
4'ID

C-EX-U-Sewer-MH

EX. SAN.22
TVOU
10

EX. S 21
MH.
OU
SEWER

.D. M
10

RIM:H.RIM EL.:W.V.
19
OU
SCALE:AS SHOWN
X26.9925.22'
2219
10
'2119
20W.V.
4'ID
C-EX-U-Sewer-MH
4'ID

Ex. C.B.
C-EX-U-Sewer-MH

EX. C.B.
Ex. 12"S
G
Ex. 12"S W.V.
SEWER 4'ID
C-EX-U-Sewer-MH

SEWER

GRATE: 17.41' 4'ID

10 C-EX-U-Sewer-MH

GRATE:
F.H.
SEWER
8

26.62'
SEWER

EX. SAN. MH. INV. 48": 5.11 DRAWN BY: M.A.R. PROJ. MGR.: M.A.R 10

24x36 24x36

X RIM EL.: 20.54' Ex. SAN. MH.
OT RIM EL.: 18.36' Ex. S.D. PLATE
10

Ex. 4"S
10

TOP: 17.90' 10

EX. 24" R.
C.P.
UT Ex. SAN. MH. INV. 12": 15.61'
SHEET
RIM EL.: 17.96'
10

OT EX. C.B.

C-101
10 8

EX. 24" R.C.P.
X
GRATE: 21.00'
10

OU OT OT 10

24x36 10

24x36

UE OE OU OT 10

10""WW
R
SEWE

Ex . 10 OT U.T.
10

Ex.
8

10 C-EX-U-Sewer-MH

10

UT
4'ID

X U.T.
10

10

10

TV
10

10

UT
CAP
10
10 10

UT UT COPYRIGHT 2025 53

.PDF

24x36 F:\AutoCAD\Projects\2019\2019184-43\DWG\2019-184-43-BayHealth-Dover-Master.dwg, Dec 04, 2025 - 3:42pm 24x36

XX-XX-XX

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

Página 54

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

24x36 24x36

1-2501-000
T.P.: 2-05-07713-0 Item 3.
1.75 ACRES
X
X

24x36
9 24x36

B.R.L.
10
STORY BLDG.
EXISTING ONE
AN RESOURCE SWPO
24x36 24x36

M
BAYHEALTH HU ORS AVE. Z

N 03 600 GOVERN

° 32 3 01 4400 000
' 40"
E T.P.: 02 05 0771
24x36

5 0.77± ACRES 24x36

HOPE STREET

PARKING S. G

B.R.
L. 9
ARCH I T E C TURE
168 SPACES OVE
24x36 24x36

RNO ENG I NE E R I NG C-EX-L-SHRUBS C-EX-L-TREE

SWPO Z

RS
B.R.
L. B.R. Dover, DE
C-PR-L-TREE-PS

AVE
L. B.R.L.
RADIUS: 1004.93'
C-PR-L-TREE-PS C-PR-L-TREE-PS

24x36 24x36

309 S. Governors Ave.
. ARC LENGTH: 279.86' B.R.L.

FIRE VAN

CHORD BEARING: N 4° 26' 02" W Dover, DE 19904
CHORD LENGTH: 278.96' Ph. 302.734.7950
Fax 302.734.7965
VAN
B.R.
24x36 24x36

L.
477.
36' Salisbury, MD
17' SWPO
9 Z 312 West Main St. Suite 300
9

LANE

24x36 24x36

  • 668.5 Salisbury, MD 21801 8 B.R.
  • L.Ph. 410.546.9100 Fax 410.546.5824 9 Wilmington, NC 24x36 24x36
6B.R.L.3205 Randall Parkway, Suite 211
B.R.B.R.L.Wilmington, North Carolina 28403
24x36
  • L.Ph. 910.341.7600 24x36

B.R.L. Fax 910.341.7506

24x36
10
FIRE LANE B.R.L.
SWPO
Z
www.beckermorgan.com 24x36

CATH

LAB NO

PARKING

FIRE7EXISTING8
EXISTING
24x3624x36

ONE STORY

CENTRAL SERVICES

LANE

F.D.C.
BRICK BUILDING
24x36
567 BUILDING 24x36

  • S.B 7,700 S.F. FOOTPRINT: 20,800 S.F. B.R.L. EXISTING R ADF SWPO

ORD BAYHEALTH - KENT CAMPUS AMBULANCE ER ENTRANCE Z F.F. ELEV.: 22.16'

ST. EXISTING 3 STORY BRICK BUILDING

24x36

B.R.
24x36

  • L.FOOTPRINT : 151,500 S.F. PROPOSED ED EXPANSION B.R.L. T 7

TRE PHASE 3

3 STORIES

24x36 24x36

PHASE 2C
E
COURTYARD
PROPOSED
N 73° 21' 04" E
DEMO THE EXISTING PROPOSED
SWPO

EMERGENCY DEPT. EXISTING

2C
24x36 24x36

PARKING GARAGE Z

LEGACY BUILDING OVERBUILD PODIUM EXPANSION
HOP
EXISTING ROOF TOP FOOTPRINT: 28,800 S.F.
3 STORIES
UPON COMPLETION OF C-PR-BLDG-OB-ED-EXPANSION-BLK

FLOORS
HELIPAD 2 THRU 3
PHASE
FIVE FLOORS 2B
- 371 SPACES
10

E S
24x36 24x36

PHASE 1A

ALL NEW FACILITIES

COURTYARD

FIRST FLOOR ELEV.: 29.83'

B.R.L.
1A
1A 2B
24x36 24x36

SWPO

Z
B.R.
L.
DUMPSTER N .
B.R.L.
24x36 24x36

COMPACTOR

C-PR-BLDG-OB-SURGERY-PAVILION C-PR-BLDG-OB-ED-BLK C-PR-BLDG-OB-SURGERY-PAVILION

EXISTING BRIDGE

24x36 24x36

SWPO

PROPOSED Z

24x36 24x36

4

BED TOWER OVERBUILD PO

PO

FLOORS 5 THRU 10 & PENTHOUSE PO PO

SOUTH STRE

24x36 24x36

HEIGHT: 175.0' PROJECT TITLE
COURTYARD B.R.L.
PHASE 1B
PROPOSED
29

BAYHEALTH
COURTYARD
B.R.
L
CENTRAL SERVICES
SWPO

1B MEDICAL

24x36 . 24x36

Z

B.R.L.
BUILDING
10 2 STORIES
CENTER, INC
C-PR-BLDG-OB-BED-TOWER-BLK

PHASE 1A

24x36 24x36

EXISTING

6 STORY TOWER WELCOME EXISTING

2004 - 3 STORY EXPANSION

CENTER

PODIUM BUILDING

24x36

W
1986 ADDITION
F.F.: 29.60'
KENT CAMPUS 24x36

SITE DEVELOPMENT

ET
12" EXISTING FIRE
COMMAND CENTER
16
MASTER PLAN
24x36 24x36

° 03'
PROPOSED C-PR-BLDG-OB-LOBBY-BLK

MAIN ENTRY SWPOZ

B.R.L.
N 87
2 STORIES
24x36
B.R.
L. PHASE 2A SOUTH STREET 24x36

34.0' PARKING

24.0' 640 S. STATE STREET

462 SPACES CITY OF DOVER

B.R.L.
2A
24x36 24x36

KENT COUNTY, DELAWARE SHEET TITLE LIMITS OF SWPOZ

PROPSED CANOPY

24x36 24x36

MASTER PLAN
3
'R 20.0'
28 PROPOSED
PHASES 1 - 3
73' X
C-PR-L-TREE-AR

5 X X X

24x36

2SIDEWALKX X
(typ.)
XXXXXXX24x36

7 PROPOSED

13
24x36

8
C-PR-L-TREE-PS
CURB (typ.) 24x36

SWPOZ C-PR-L-TREE-PS

X

38
4VALE1
T
B36
24.0'
579.0 .R.L.
24x3624x36
6'8
B.R.L.
6B.R.L.
24x3624x36
B.R.L130.00'
.
0204080
B.R.L.
6
SWPOZ
B.R.L.
6EX. TW
50
24x3624x36

FRAME STORY

  • S.S B.R.L . D HOU Do Not Explode - Select Scale

SCALE: 1" = 40'

TAT SE

EX. TWO STORY

E S BRICK HOUSE

TRE PROPOSED

24x36 24x36

(OFFICE) ISSUE BLOCK
E
B.R.L
T .
PARKING GARAGE
20

4 STORIES - 500 SPACES

24x36 24x36

PHASE 2A 658.85'
X
B.R.L
S 01 .
° 34'
X
34" W

2A
24x36 24x36

'
X 20.00

B.R.L.
24x36 24x36

X
SWP
B.R.L OZ
.
X .
. .
C-PR-BLDG-OB-GARGE-BLK

41.50' .

20.00'
24x36 24x36

MARK DATE DESCRIPTION X FCM B.R.L. LAYER STATE: C-101MP

ON-SITE PAVEMENT SECTION LEGEND

X B.R.L. 25.00' PROJECT NO.: 2019184.50

2019-184-43L-On-Site-Pavement-Legend

DATE: 2025-12-04

24x36 24x36

O
SWP SCALE: AS SHOWN
X
FULL DEPTH PAVEMENT SECTION Z

DRAWN BY: M.A.R. PROJ. MGR.: M.A.R

24x36 24x36

RADIUS: 1402.69' X

ARC LENGTH: 402.65' SHEET CONCRETE PAVING CHORD BEARING: S 6° 18' 06" E

C-200
X
24x36
. CHORD LENGTH: 401.27' 24x36

X
COPYRIGHT 2025
54

.PDF

24x36 F:\AutoCAD\Projects\2019\2019184-43\DWG\2019-184-43-BayHealth-Dover-Master.dwg, Dec 04, 2025 - 3:46pm 24x36

XX-XX-XX

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

Página 55

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

24x36 24x36

1-2501-000
T.P.: 2-05-07713-0 Item 3.
1.75 ACRES
X
X

24x36
9 24x36

FCM

10
STORY BLDG.
EXISTING ONE
AN RESOURCE
24x36 24x36

M
BAYHEALTH HU ORS AVE.
600 GOVERN
3 01 4400 000
T.P.: 02 05 0771
24x36

5 0.77± ACRES 24x36

  • S.G 9 ARCH I T E C TURE OVE 24x36 24x36

RNO ENG I NE E R I NG C-EX-L-SHRUBS C-EX-L-TREE

RS Dover, DE
C-PR-L-TREE-PS

AVE C-PR-L-TREE-PS C-PR-L-TREE-PS

24x36 24x36

309 S. Governors Ave.
.
FIRE
VAN

FIP

Dover, DE 19904
Ph. 302.734.7950
Fax 302.734.7965
24x36
VAN 24x36

Salisbury, MD
9 312 West Main St. Suite 300
9

LANE

24x36 24x36

8

5Salisbury, MD 21801
Ph. 410.546.9100
Fax 410.546.5824
9
Wilmington, NC
24x3624x36

FIP

63205 Randall Parkway, Suite 211
Wilmington, North Carolina 28403
Ph. 910.341.7600
24x3624x36

Fax 910.341.7506

24x36
10
FIRE LANE FCM
www.beckermorgan.com 24x36

CATH

LAB NO

PARKING

FIRE7EXISTING8
EXISTING
24x3624x36

ONE STORY

CENTRAL SERVICES

LANE

F.D.C.
BRICK BUILDING
24x36
FIP
567 BUILDING 24x36

  • S.B EXISTING 7,700 S.F. FOOTPRINT: 20,800 S.F. R ADF ORD BAYHEALTH - KENT CAMPUS AMBULANCE ER ENTRANCE F.F. ELEV.: 22.16'

ST. EXISTING 3 STORY BRICK BUILDING

24x36 24x36

FOOTPRINT : 151,500 S.F.
T 7

TRE

24x36 24x36

E
COURTYARD
PROPOSED
EMERGENCY DEPT.
FIP
EXISTING
24x36 24x36

OVERBUILDPARKING GARAGE
HOP
EXISTING ROOF TOPFOOTPRINT: 28,800 S.F.10
FLOORS
HELIPAD 2 THRU3FIVE FLOORS - 371 SPACES

E S
24x36 24x36

PHASE 1A FIRST FLOOR ELEV.: 29.83'

COURTYARD

24x36 24x36

FIP

24x36
DUMPSTER N . 24x36

COMPACTOR

C-PR-BLDG-OB-SURGERY-PAVILION C-PR-BLDG-OB-ED-BLK

EXISTING BRIDGE

24x36 24x36

24x36

PROPOSED 4

24x36

BED TOWER OVERBUILD PO

PO

FLOORS 5 THRU 10 & PENTHOUSE PO PO

SOUTH STRE

24x36 24x36

COURTYARD HEIGHT: 175.0' PROJECT TITLE
PHASE 1B
PROPOSED
29

BAYHEALTH COURTYARD

CENTRAL SERVICES

MEDICAL

24x36 24x36

BUILDING
10 2 STORIES
CENTER, INC
C-PR-BLDG-OB-BED-TOWER-BLK

PHASE 1A

24x36 24x36

EXISTING

6 STORY TOWER WELCOME EXISTING

2004 - 3 STORY EXPANSION

CENTER

PODIUM BUILDING

24x36

1986 ADDITION

F.F.: 29.60'
KENT CAMPUS 24x36

SITE DEVELOPMENT

ET
EXISTING FIRE
COMMAND CENTER
16
MASTER PLAN
24x36 24x36

24x36 24x36

640 S. STATE STREET

24x36
CITY OF DOVER 24x36

KENT COUNTY, DELAWARE

SHEET TITLE

24x36 24x36

MASTER PLAN 3

FIPC

PHASES 1A & 1B X C-PR-L-TREE-AR

5 X X X X

X
24x36

2 X X X X 24x36

FIPC X X X

7
13
8
C-PR-L-TREE-PS

24x36 24x36
C-PR-L-TREE-PS

X
FPK

38
41
24x36
3624x36

8
6
24x36 24x36

1
6 0 20 40 80

6EX. TW
50
24x3624x36

FRAME STORY

FCM

  • S.S D HOU Do Not Explode - Select Scale

SCALE: 1" = 40'

TAT SE

EX. TWO STORY

E S BRICK HOUSE

TRE

24x36 24x36

(OFFICE) ISSUE BLOCK

ET20
24x3624x36

X

X
24x36 24x36

X

FCM

24x36 24x36

X

X .
. . .
24x36

FCM 24x36

MARK DATE DESCRIPTION X FCM LAYER STATE: C-101MP

X
FCM PROJECT NO.: 2019184.50
DATE: 2025-12-04
24x36 24x36

SCALE: AS SHOWN X

DRAWN BY: M.A.R. PROJ. MGR.: M.A.R

24x36 24x36

X

SHEET

C-201
X
24x36 24x36

X
COPYRIGHT 2025
55

.PDF

24x36 F:\AutoCAD\Projects\2019\2019184-43\DWG\2019-184-43-BayHealth-Dover-Master.dwg, Dec 04, 2025 - 3:48pm 24x36

XX-XX-XX

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

Página 56

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

24x36 24x36

1-2501-000
T.P.: 2-05-07713-0 Item 3.
1.75 ACRES
X
X

24x36
9 24x36

10
STORY BLDG.
EXISTING ONE
AN RESOURCE
24x36 24x36

M
BAYHEALTH HU ORS AVE.
600 GOVERN
3 01 4400 000
T.P.: 02 05 0771
24x36

5 0.77± ACRES 24x36

  • S.G 9 ARCH I T E C TURE OVE 24x36 24x36

RNO ENG I NE E R I NG C-EX-L-SHRUBS C-EX-L-TREE

RS Dover, DE
C-PR-L-TREE-PS

AVE C-PR-L-TREE-PS C-PR-L-TREE-PS

24x36 24x36

309 S. Governors Ave.
.
FIRE
VAN

Dover, DE 19904
Ph. 302.734.7950
Fax 302.734.7965
24x36
VAN 24x36

Salisbury, MD
9 312 West Main St. Suite 300
9

LANE

24x36 24x36

8

5Salisbury, MD 21801
Ph. 410.546.9100
Fax 410.546.5824
9
Wilmington, NC
24x3624x36
63205 Randall Parkway, Suite 211
Wilmington, North Carolina 28403
Ph. 910.341.7600
24x3624x36

Fax 910.341.7506

24x36
10
FIRE LANE www.beckermorgan.com 24x36

CATH

LAB NO

PARKING

FIRE7EXISTING8
EXISTING
24x3624x36

ONE STORY

CENTRAL SERVICES

LANE

F.D.C.
BRICK BUILDING
24x36
567 BUILDING 24x36

  • S.B EXISTING 7,700 S.F. FOOTPRINT: 20,800 S.F. R ADF ORD BAYHEALTH - KENT CAMPUS AMBULANCE ER ENTRANCE F.F. ELEV.: 22.16'

ST. EXISTING 3 STORY BRICK BUILDING

24x36 24x36

FOOTPRINT : 151,500 S.F.PROPOSED
TED EXPANSION7

TRE

3 STORIES

24x36 24x36

PHASE 2C

E
COURTYARD
PROPOSED
24x36

EMERGENCY DEPT. PROPOSED EXISTING

24x36

OVERBUILD PARKING GARAGE PODIUM EXPANSION HOP EXISTING ROOF TOP FOOTPRINT: 28,800 S.F. 3 STORIES 10 FLOORS HELIPAD 2 THRU 3 PHASE FIVE FLOORS 2B - 371 SPACES C-PR-BLDG-OB-ED-EXPANSION-BLK

E S
24x36 24x36

PHASE 1A FIRST FLOOR ELEV.: 29.83'

COURTYARD

24x36 24x36

24x36
DUMPSTER N . 24x36

COMPACTOR

C-PR-BLDG-OB-SURGERY-PAVILION C-PR-BLDG-OB-ED-BLK C-PR-BLDG-OB-SURGERY-PAVILION

EXISTING BRIDGE

24x36 24x36

24x36

PROPOSED 4

24x36

BED TOWER OVERBUILD PO

PO

FLOORS 5 THRU 10 & PENTHOUSE PO PO

SOUTH STRE

24x36 24x36

COURTYARD HEIGHT: 175.0' PROJECT TITLE
PHASE 1B
PROPOSED
29

BAYHEALTH COURTYARD

CENTRAL SERVICES

MEDICAL

24x36 24x36

BUILDING
10 2 STORIES
CENTER, INC
C-PR-BLDG-OB-BED-TOWER-BLK

PHASE 1A

24x36 24x36

EXISTING

6 STORY TOWER WELCOME EXISTING

2004 - 3 STORY EXPANSION

CENTER

PODIUM BUILDING

24x36

1986 ADDITION

F.F.: 29.60'
KENT CAMPUS 24x36

SITE DEVELOPMENT

ET
EXISTING FIRE
COMMAND CENTER
16
MASTER PLAN
24x36 24x36

PROPOSED C-PR-BLDG-OB-LOBBY-BLK

MAIN ENTRY

2 STORIES

24x36

PHASE 2A 24x36

34.0'
24.0' 640 S. STATE STREET
24x36
CITY OF DOVER 24x36

KENT COUNTY, DELAWARE

SHEET TITLE

LIMITS OF

PROPSED CANOPY

24x36 24x36

MASTER PLAN
3
'R 20.0'
28 PROPOSED
PHASES 2A, 2B & 2C
73' X
C-PR-L-TREE-AR

5 X X X

24x36

2 SIDEWALK

FIPC X X

(typ.)
X X X X X X X 24x36

7 PROPOSED

13
24x36

8C-PR-L-TREE-PS
C-PR-L-TREE-PS
CURB (typ.)24x36

X

38
4VALE1
T
24x36
36
24.0'24x36

8
6
24x36 24x36

130.00'
60204080
6EX. TW
50
24x3624x36

FRAME STORY

  • S.S D HOU Do Not Explode - Select Scale

SCALE: 1" = 40'

TAT SE

EX. TWO STORY

E S BRICK HOUSE

TRE PROPOSED

24x36 24x36

(OFFICE) ISSUE BLOCK E T PARKING GARAGE 20

4 STORIES - 500 SPACES

24x36 24x36

PHASE 2A X

X
24x36 24x36

'
X 20.00

24x36 24x36

X

X .
. .
C-PR-BLDG-OB-GARGE-BLK

41.50' .

20.00'
24x36 24x36

MARK DATE DESCRIPTION X FCM LAYER STATE: C-101MP

ON-SITE PAVEMENT SECTION LEGEND

X
25.00' PROJECT NO.: 2019184.50
2019-184-43L-On-Site-Pavement-Legend

DATE: 2025-12-04

24x36 24x36

SCALE: AS SHOWN

X
FULL DEPTH PAVEMENT SECTION
DRAWN BY: M.A.R. PROJ. MGR.: M.A.R
24x36 24x36

X

SHEET

CONCRETE PAVING

C-202
X
24x36
. 24x36

X
COPYRIGHT 2025
56

.PDF

24x36 F:\AutoCAD\Projects\2019\2019184-43\DWG\2019-184-43-BayHealth-Dover-Master.dwg, Dec 04, 2025 - 3:51pm 24x36

XX-XX-XX

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

Página 57

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

24x36 24x36

1-2501-000
T.P.: 2-05-07713-0 Item 3.
1.75 ACRES
X
X

24x36
9 24x36

10
STORY BLDG.
EXISTING ONE
AN RESOURCE
24x36 24x36

M
BAYHEALTH HU ORS AVE.
600 GOVERN
3 01 4400 000
T.P.: 02 05 0771
24x36

5 0.77± ACRES 24x36

  • S.G 9 ARCH I T E C TURE OVE 24x36 24x36

RNO ENG I NE E R I NG C-EX-L-SHRUBS C-EX-L-TREE

RS Dover, DE
C-PR-L-TREE-PS

AVE C-PR-L-TREE-PS C-PR-L-TREE-PS

24x36 24x36

309 S. Governors Ave.
.
FIRE
VAN

Dover, DE 19904
Ph. 302.734.7950
Fax 302.734.7965
24x36
VAN 24x36

Salisbury, MD
9 312 West Main St. Suite 300
9

LANE

24x36 24x36

8

5Salisbury, MD 21801
Ph. 410.546.9100
Fax 410.546.5824
9
Wilmington, NC
24x3624x36
63205 Randall Parkway, Suite 211
Wilmington, North Carolina 28403
Ph. 910.341.7600
24x3624x36

Fax 910.341.7506

24x36
10
FIRE LANE www.beckermorgan.com 24x36

CATH

LAB NO

PARKING

FIRE7EXISTING8
EXISTING
24x3624x36

ONE STORY

CENTRAL SERVICES

LANE

F.D.C.
BRICK BUILDING
24x36
567 BUILDING 24x36

  • S.B EXISTING 7,700 S.F. FOOTPRINT: 20,800 S.F. R ADF ORD BAYHEALTH - KENT CAMPUS AMBULANCE ER ENTRANCE F.F. ELEV.: 22.16'

ST. EXISTING 3 STORY BRICK BUILDING

24x36 24x36

FOOTPRINT : 151,500 S.F.PROPOSED
TED EXPANSION7

TRE PHASE 3

3 STORIES

24x36 24x36

PHASE 2C

E
COURTYARD
DEMO THE EXISTING PROPOSED
24x36

EMERGENCY DEPT. PROPOSED EXISTING

24x36

LEGACY BUILDING OVERBUILD PARKING GARAGE
PODIUM EXPANSION
HOP
EXISTING ROOF TOP FOOTPRINT: 28,800 S.F.
3 STORIES
UPON COMPLETION OF C-PR-BLDG-OB-ED-EXPANSION-BLK

FLOORS
HELIPAD 2 THRU 3
PHASE
FIVE FLOORS 2B
- 371 SPACES
10

E S
24x36 24x36

PHASE 1A FIRST FLOOR ELEV.: 29.83'

ALL NEW FACILITIES

COURTYARD

24x36 24x36

24x36
DUMPSTER N . 24x36

COMPACTOR

C-PR-BLDG-OB-SURGERY-PAVILION C-PR-BLDG-OB-ED-BLK C-PR-BLDG-OB-SURGERY-PAVILION

EXISTING BRIDGE

24x36 24x36

24x36

PROPOSED 4

24x36

BED TOWER OVERBUILD PO

PO

FLOORS 5 THRU 10 & PENTHOUSE PO PO

SOUTH STRE

24x36 24x36

COURTYARD HEIGHT: 175.0' PROJECT TITLE
PHASE 1B
PROPOSED
29

BAYHEALTH COURTYARD

CENTRAL SERVICES

MEDICAL

24x36 24x36

BUILDING
10 2 STORIES
CENTER, INC
C-PR-BLDG-OB-BED-TOWER-BLK

PHASE 1A

24x36 24x36

EXISTING

6 STORY TOWER WELCOME EXISTING

2004 - 3 STORY EXPANSION

CENTER

PODIUM BUILDING

24x36

1986 ADDITION

F.F.: 29.60'
KENT CAMPUS 24x36

SITE DEVELOPMENT

ET
EXISTING FIRE
COMMAND CENTER
16
MASTER PLAN
24x36 24x36

PROPOSED C-PR-BLDG-OB-LOBBY-BLK

MAIN ENTRY

2 STORIES

24x36

PHASE 2A 24x36

640 S. STATE STREET

24x36
CITY OF DOVER 24x36

KENT COUNTY, DELAWARE

SHEET TITLE

24x36 24x36

MASTER PLAN
3
'R 20.0'
28
PHASE 3
X
C-PR-L-TREE-AR

5 X X X X

X
24x36

2 X X X X 24x36

FIPC X X X

7
13
8
C-PR-L-TREE-PS

24x36 24x36
C-PR-L-TREE-PS

X

38
41
24x36
3624x36

8
6
24x36 24x36

130.00'
60204080
6EX. TW
50
24x3624x36

FRAME STORY

  • S.S D HOU Do Not Explode - Select Scale

SCALE: 1" = 40'

TAT SE

EX. TWO STORY

E S BRICK HOUSE

TRE PROPOSED

24x36 24x36

(OFFICE) ISSUE BLOCK E T PARKING GARAGE 20

4 STORIES - 500 SPACES

24x36 24x36

PHASE 2A X

X
24x36 24x36

'
X 20.00

24x36 24x36

X

X .
. .
C-PR-BLDG-OB-GARGE-BLK

41.50' .

20.00'
24x36 24x36

MARK DATE DESCRIPTION X FCM LAYER STATE: C-101MP

X
25.00' PROJECT NO.: 2019184.50
DATE: 2025-12-04
24x36 24x36

SCALE: AS SHOWN X

DRAWN BY: M.A.R. PROJ. MGR.: M.A.R

24x36 24x36

X

SHEET

C-203
X
24x36 24x36

X
COPYRIGHT 2025
57

.PDF

24x36 F:\AutoCAD\Projects\2019\2019184-43\DWG\2019-184-43-BayHealth-Dover-Master.dwg, Dec 04, 2025 - 3:52pm 24x36

XX-XX-XX

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

Página 58

01-000
24x36 24x36

: 2-05-07713-01-25 Item 3.
1.75 ACRES
X

24x36 24x36

STORY BLDG. B.R.L.
EXISTING ONE
M AN RESOURCE
BAYHEALTH HU ORS AVE.
24x36 24x36

600 GOVERN

3 01 4400 000
T.P.: 02 05 0771
24x36 5 0.77 ± AC RES 24x36

  • S.G B.R. L. 24x36

OVE ARCH I T E C TURE 24x36

RNO ENG I NE E R I NG C-EX-L-SHRUBS C-EX-L-TREE

RS
B.R.
L. B.R.
Dover, DE
C-PR-L-TREE-PS

AVE

24x36
C-PR-L-TREE-PS

  • L.C-PR-L-TREE-PS

B.R.L. 24x36

.
B.R.L.
309 S. Governors Ave.

24x36
FIRE B.R.
L.
Dover, DE 19904
Ph. 302.734.7950
Fax 302.734.7965 24x36

Salisbury, MD
312 West Main St. Suite 300

LANE

5
24x36 24x36

B.R. Salisbury, MD 21801
L.
Ph. 410.546.9100
Fax 410.546.5824
9
Wilmington, NC
24x36 24x36

6
3205 Randall Parkway, Suite 211
B.R. B.R.L. Wilmington, North Carolina 28403
L.
Ph. 910.341.7600
24x36 24x36

B.R.L.
Fax 910.341.7506

24x36
FIRE LANE B.R.L. www.beckermorgan.com 24x36

CATH

LABNO
PARKING
LANDSCAPE LEGEND
24x36
FIRE7EXISTING24x36

ONE STORY

LANE

F.D.C.
BRICK BUILDING
567 PROPOSED
7,700 S.F. CANOPY TREE
24x36 24x36

B.R.L.
EXISTING
BAYHEALTH - KENT CAMPUS AMBULANCE
ER ENTRANCE
24x36

B.R. EXISTING 3 STORY BRICK BUILDING 24x36

L.
FOOTPRINT : 151,500 S.F. PROPOSED PROPOSED
ED EXPANSION B.R.L.
T EVERGREEN

TRE PHASE 3

24x36

3 STORIES TREE

24x36

PHASE 2C

E
COURTYARD
DEMO THE EXISTING PROPOSED
EMERGENCY DEPT. PROPOSED EXISTING
2C PARKING GARAGE
PODIUM EXPANSION
24x36 24x36

LEGACY BUILDING OVERBUILD
HOP
EXISTING ROOF TOP FOOTPRINT: 28,800 S.F.
3 STORIES GENERAL LANDSCAPE NOTES :
UPON COMPLETION OF C-PR-BLDG-OB-ED-EXPANSION-BLK

FLOORS
HELIPAD 2 THRU 3
PHASE
FIVE FLOORS - 371 2B
SPACES

E S
PHASE 1A
24x36 24x36

FIRST FLOOR ELEV.: 29.83'

ALL NEW FACILITIES

COURTYARD 1. QUALITY AND SIZE OF PLANTS, SPREAD OF ROOTS, AND SIZE OF BALLS SHALL BE IN ACCORDANCE WITH THE CURRENT STANDARDS OF THE AMERICAN ASSOCIATION OF NURSERYMEN "AMERICAN STANDARDS FOR 24x36 B.R.L. NURSERY STOCK." 24x36

B.R. EVERGREEN TREES SHALL HAVE A FULL, WELL-BRANCHED, CONICAL FORM TYPICAL OF THE SPECIES. L N . . ALL DECIDUOUS SHADE TREES SHALL BRANCH A MINIMUM OF 7'-0" ABOVE GROUND LEVEL. TREES SHALL BE

B.R.L.
24x36

PLANTED AND STAKED IN ACCORDANCE WITH THE DETAIL SHOWN. 24x36

C-PR-BLDG-OB-ED-BLK C-PR-BLDG-OB-SURGERY-PAVILION PLANT MATERIALS DELIVERED TO THE SITE IN UNCOVERED TRUCKS WILL BE REJECTED. C-PR-BLDG-OB-SURGERY-PAVILION

24x36

EXISTING BRIDGE

UNACCEPTABLE PLANT MATERIALS: MATERIALS WHICH HAVE DAMAGED OR CROOKED LEADERS, DEFORMED GROWTH HABIT, ABRASIONS OF THE BARK, SUN SCALD, WINDBURN, DISFIGURING NOT COMPLETELY CALLUSED 24x36

WILL BE REJECTED. IN ADDITION, TREES HAVING THEIR CENTRAL LEADERS HEADED BACK WILL ALSO BE

PROPOSED REJECTED. PLANTS WITH LOOSE OR CRACKED ROOT BALL OR CONTAINERS WILL BE REJECTED. 4

BED TOWER OVERBUILD

24x36 24x36

  • 2.ALL PLANTS SHALL BE PLANTED IN TOPSOIL THAT IS THOROUGHLY WATERED AND TAMPED AS BACKFILLING PROGRESSES. NOTHING BUT SUITABLE TOPSOIL, FREE OF DRY SOD, STIFF CLAY, LITTER, STONES IN EXCESS OF FLOORS 5 THRU 10 & PENTHOUSE PO PO

ONE (1) INCH DIAMETER, ETC. SHALL BE USED FOR PLANTING.

SOUTH STRE

HEIGHT: 175.0'

B.R.L.
24x36 24x36

COURTYARD MULCH FOR PLANTING BEDS SHALL BE SHREDDED HARDWOOD BARK MULCH UNLESS OTHERWISE SPECIFIED ON PROJECT TITLE PHASE 1B PROPOSED 29 COURTYARD THE PLANS AND SHALL HAVE NO LEAVES, YOUNG GREEN GROWTH, BRANCHES, TWIGS, GREATER IN DIAMETER

BAYHEALTH B.R. OF ½", WEEDS, SHAVINGS OR FOREIGN MATERIAL SUCH AS STONES, ETC. SHALL BE MIXED WITH THE MULCH. L. CENTRAL SERVICES ALL SHRUB MASSES SHALL BE PLANTED IN CONTINUOUS MULCHED BEDS WITH A LIGHTLY COMPACTED DEPTH

MEDICAL

24x36 24x36

OF THREE (3) INCHES. ALL CONTAINER PLANTS ARE TO HAVE ROOTS CUT ON FOUR SIDES AND/ OR SPREAD OUT

B.R.L.
BUILDING
IN NEW SOIL MIXTURE.

10 3. ALL AREAS2NOT
STORIES
CENTER, INC
C-PR-BLDG-OB-BED-TOWER-BLK

24x36

EXISTING 133,150 S.F.± STABILIZED IN PAVING OR PLANT MATERIALS SHOULD BE SEEDED AND MULCHED. (SEE EROSION PHASE 1A & SEDIMENT CONTROL PLAN AND NOTES.) 24x36

6 STORY TOWER WELCOME EXISTING 2004 - 3 STORY EXPANSION CENTER PODIUM BUILDING 4. LANDSCAPE BEDS NOT DEFINED BY CURBS, SIDEWALKS, WALLS OR OTHER STRUCTURES SHALL BE ENCLOSED

DOVER CAMPUS

F.F.: 29.60' BY ALUMINUM EDGING UNLESS OTHERWISE INDICATED.
24x36

1986 ADDITION 24x36

  • 5.AREAS DISTURBED BY LANDSCAPE OPERATIONS SHALL BE GRADED TO MATCH EXISTING TOPSOIL AND SEED OR EXISTING FIRE COMMAND CENTER ET SOD AS REQUIRED. SITE DEVELOPMENT 16 PROPOSED 6. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO UTILITIES AND MAY MAKE MINOR ADJUSTMENTS IN MASTER PLAN 24x36 24x36

C-PR-BLDG-OB-LOBBY-BLK

SPACING AND/OR LOCATION OF PLANT MATERIALS. CONTRACTOR TO VERIFY "AS BUILT" LOCATION OF ALL MAIN ENTRY B.R.L. UTILITIES. B.R. 2 STORIES 24x36

  • L.PHASE 2A 7. NO PLANT, EXCEPT GROUNDCOVERS, SHALL BE WITHIN THREE (3) FEET FROM SIDEWALKS. 24x36
  • 8.NO TREE SHALL BE PLANTED CLOSER THAN TEN (10) FEET FROM ANY STRUCTURE OR BUILDING.

B.R.L. 9. NO TREE SHALL BE PLANTED WITHIN TEN (10) FEET OF UNDERGROUND UTILITIES OR FIRE HYDRANTS. 24x36 24x36

  • 10.ONLY TREES THAT REACH A HEIGHT AND SIZE AT MATURITY OF SMALL TO MEDIUM SHALL BE PLANTED UNDER POWER LINES. SHEET TITLE

3
24x36 24x36

X 11. THE CONTRACTOR SHALL WATER ALL PLANTS THOROUGHLY TWICE DURING THE FIRST 24-HOUR PERIOD AFTER PLANTING, AND THEN WEEKLY OR MORE OFTEN, IF NECESSARY, DURING THE FIRST GROWING SEASON, UNLESS THE OWNER AGREES TO MAINTAIN AND WATER THEM. CONCEPT LANDSCAPE C-PR-L-TREE-AR

5XXXX
X
2XXXX
X
24x3624x36

X X 12. TREES TO REMAIN ON-SITE SHALL BE PROTECTED WITH SNOW FENCE DURING CONSTRUCTION (SEE DETAIL). 7 13 13. SNOW FENCING TO BE MAINTAINED DURING CONSTRUCTION BY CONTRACTOR.

THE PLANTING PLAN SHALL TAKE PRECEDENCE OVER THE PLANT SCHEDULE SHOULD ANY PLANT QUANTITY MASTER PLAN 8 C-PR-L-TREE-PS

24x36
C-PR-L-TREE-PS

24x36

X
DISCREPANCIES OCCUR.

3 14. 8 NO SUBSTITUTIONS SHALL BE MADE WITHOUT APPROVAL OF THE OWNER AND/ OR THE LANDSCAPE ARCHITECT.

4VALET1
36
B.R.L
.
24x36
  • 15.ALL NEW TREES SHALL BE GUARANTEED TO SURVIVE FOR ONE FULL YEAR AFTER INSTALLATION (FULL COST). 24x36

8 ALL STAKES AND GUYS SHALL BE REMOVED FROM TREES AND SITE AS EARLY AS THREE (3) MONTHS, BUT NO

6LONGER THAN ONE (1) YEAR AFTER PLANTING.
B.R.L.
B.R.L1
24x3624x36

.
6
B.R.L. TREE PRESERVATION & DENSITY REQUIREMENTS B.R.L. 0 20 40 80

6EX. TW1.EXISTING WOODLAND AREA :0 S.F.
50
FRAME STORY
S. S
24x3624x36

B.R.L

. D HOU Do Not Explode - Select Scale

TAT SE 2. WOODLANDS TO BE CLEARED : 0 S.F.
EX. TWO STORY SCALE: 1" = 40'
E S BRICK HOUSE 3. TOTAL WOODLANDS REMAINING : 0 S.F.
TRE PROPOSED
24x36 24x36

(OFFICE)

ET
B.R.L 4. TOTAL NON-WOODLAND AREA : 133,150 S.F. ISSUE BLOCK
.
PARKING GARAGE
20
5. DENSITY : 1 TREE PER 3,000 S.F. OF LOT AREA
24x36

4 STORIES - 500 SPACES 133,150 / 3,000 S.F. / TREE = 44.38 45 TREES REQUIRED 24x36

B.R.L . PHASE 2A 6. EXISTING TREES TO BE RETAINED : 9 TREES

  • 7.PROPOSED TREES : 36 TREES 24x36 24x36
  • 8.TOTAL TREES : 45 TREES

24x36

B.R.L. 24x36

.B.R.L DELAWARE LANDSCAPE ARCHITECTS CERTIFICATION . C-PR-BLDG-OB-GARGE-BLK

I, CHAD D. CARTER, RLA, ASLA, HEREBY CERTIFY THAT I AM A . . .
LANDSCAPE ARCHITECT IN THE STATE OF DELAWARE, THAT THE
24x36 24x36

B.R.L. MARK DATE DESCRIPTION

LANDSCAPING INFORMATION SHOWN HEREON HAS BEEN PREPARED LAYER STATE: L-101 UNDER MY SUPERVISION AND TO MY BEST KNOWLEDGE AND BELIEF, B.R.L. REPRESENTS GOOD LANDSCAPING PRACTICES. PROJECT NO.: 2019184.50 DATE: 2025-12-03 24x36 24x36

SCALE: AS SHOWN

LANDSCAPE PROJECT DRAWN BY: P.R.R. PROJ. MGR.: M.A.R

24x36 24x36

AREA: 133,150 S.F.± SHEET

24x36

TREES REQUIRED: 133,150 / 3,000 = 45 TREES

CHAD D. CARTER, RLA, ASLA S1-499 DATE L-101

COPYRIGHT 2025

24x36

Bayhealth MP - L101 - 24x36-40 - 2025-12-01 58 24x36 F:\AutoCAD\Projects\2019\2019184-43\DWG\2019-184-50-BayHealth-Master-Landscape.dwg, Dec 03, 2025 - 4:07pm 24x36

XX-XX-XX

Página 59

11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17

24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

11x17 24x36 24x36 11x17

WWW.beckermorgan.com 01- ENGINEERS CERTIFICATION BUILDING DATA SITE DATA - SITE DEVELOPMENT MASTER PLAN 713- BAYHEALTH 5-07 2019-184-50-Engineers-Cert-GVM 2019-184-50-Bldg-Data-001 2019-184-50-Site-Data-001R

SOUTH STREET

02-0 01-00001
11x17 24x36 24x36 11x17

PARCEL I, GREGORY V. MOORE, P.E., HEREBY CERTIFY THAT I AM A REGISTERED ENGINEER IN THE STATE OF DELAWARE, PHASE GROSS S.F. FOOTPRINT S.F. FLOORS / HEIGHT BEDS N 02-05-07713-01-1800-00001 18 N THAT THE INFORMATION SHOWN HEREON HAS BEEN PREPARED UNDER MY SUPERVISION AND TO THE BEST OF EXISTING CAMPUS 1. OWNER OF RECORD: BAYHEALTH MEDICAL CENTER, INC. 640 SOUTH STATE STREET Item 3. ET TRE MY KNOWLEDGE AND BELIEF REPRESENTS GOOD ENGINEERING PRACTICES AS REQUIRED BY THE APPLICABLE HOSPITAL 607,000 S.F. 207,700 S.F. VARIES - 6 FLOORS: 90' 266 DOVER, DE 19901 E R S EET LAWS OF THE STATE OF DELAWARE. 11x17 24x36 WAT STR PARKING GARAGE 144,000 S.F. 28,800 S.F. 5 FLOORS: 75' C/O: MIKE METZING 24x36 11x17

TH
SOU PHASE 1
PHONE: 302-744-7027 mike_metzing@bayhealth.org

1A: EMERGENCY DEPT. OVERBUILD 53,140 S.F. OVERBUILD FLOORS: 2 - 3: 42' 2. ENGINEER OF RECORD: BECKER MORGAN GROUP, INC. 738 SOUTH GOVERNORS AVENUE 1A: CENTRAL SERVICE BLDG. ADDITION 6,000 S.F. 3,000 S.F. FLOORS: 1 - 2: 60' 11x17 24x36

DOVER, DE 19901 24x36 11x17

GREGORY V. MOORE P.E. NO.: 9311 DATE 1B: BED TOWER OVERBUILD 219,400 S.F. 1,675 S.F. FLOORS: 5 - 10 66 C/O: GREGORY V. MOORE & PENTHOUSE: 175' PHONE: 302-734-7950 gvmoore@beckermorgan.com SITE OWNERS CERTIFICATION PHASE 2 ARCH I T E C TURE

SOUTH GOVERNO

2019-184-28L-Owners-Cert 3. PROPERTY MAP NUMBERS: 02-05-077.13-01-5200-000 BAYHEALTH CAMPUS PARCELS 2A: NEW PARKING GARAGE (500 SPACES) 180,000 S.F. 46,310 S.F. FLOORS: 1 - 4: 60'

SOUTH STATE STREET

11x17 24x36 24x36 11x17

02-05-077.13-01-4800-000 (TO BE CONSOLIDATED) WE, BAYHEALTH MEDICAL CENTER, INC., HEREBY CERTIFY THAT WE ARE THE OWNER OF THE PROPERTY 2B: MAIN ENTRY ADDITION 7,100 S.F. 5,600 S.F. FLOORS: 1 - 2: 30' ENG I NE E R I NG

SOUTH GOVERNO 02-05-077.13-02-0100-000 T H

BECKER MORGAN GROUP ARCHITECTURE - ENGINEERING DELAWARE - MARYLAND - NORTH CAROLINA - VIRGINIA DESCRIBED AND SHOWN ON THIS PLAN, THAT THE PLAN WAS MADE AT OUR DIRECTION, AND THAT WE 2B: DEMO EXISTING PARKING GARAGE -116,000 S.F. -28,800 S.F. FLOORS: 1 - 5: 75' HOPE STREET PARKING LOT SITE 02-05-077.13-02-0200-000 IGH ACKNOWLEDGE THE SAME TO US BY ACT AND DESIRE THE PLAN TO BE DEVELOPED AS SHOWN IN ACCORDANCE

RS AVE. BAYHEALTH PARCELS 2B: SURGICAL PAVILION 137,500 S.F. 36.415 S.F. FLOORS: 2 - 3: 60' 28 02-05-077.13-02-1200-000 Dover, DE WAY 11x17 24x36 T KENT CAMPUS WITH ALL APPLICABLE LAWS AND REGULATIONS. 24x36 11x17

2C: EMERGENCY DEPART. EXPANSION 25,200 S.F. 6,400 S.F. FLOORS: 1 - 3: 60'

SOUTH STATE STREE

02-05-07713-01-5200-00001 02-05-077.13-01-1800-000 SOUTH STREET PARKING 309 S. Governors Ave.

RS AVENUE

13.13 ACRES

PHASE 3 02-05-077.13-01-1801-000 PARCELS

Dover, DE 19904

DUP 3: DEMO EXISTING LEGACY BUILDING -310,000 S.F. -112,600 S.F. FLOORS: 1 - 6: 90' 4. TOTAL ACREAGE OF SITE: BAYHEALTH CAMPUS: 13.13 ACRES ± POST CONSOLODATION Ph. 302.734.7950 ON MIKE METZING VP, CORPORATE SUPPORT SERVICES DATE 11x17 24x36

HOPE STREET POST PHASE 3 HOPE STREET PARKING LOT: 1.49 ACRES ± Fax 302.734.7965 24x36 11x17

HOSPITAL623,340 S.F.174,000 S.F.360SOUTH STREET PARKING LOT:7.93 ACRES ±
SOU
BAYHEALTH
HOPE STREETGENERAL NOTESPARKING GARAGE180,000 S.F.46,300 S.F.TOTAL AREA:22.55 ACRES ±Salisbury, MD
TH
2019-184-50RZ-G-Notes
PARCEL

11x17 24x36 1. THE BOUNDARY LINES PORTRAYED HEREON HAVE BEEN ESTABLISHED BASED SOLELY ON PHYSICAL CENTRAL SERVICE BLDG. ADDITION 6,000 S.F. 3,000 S.F. 5. ZONING CLASSIFICATION: IO - INSTITUTIONAL & OFFICE 312 West Main St. Suite 300 24x36 11x17

EVIDENCE DISCOVERED IN THE FIELD IN CONJUNCTION WITH DETERMINATIONS DERIVED FROM SOURCE OF TOTAL: 809,340 S.F. 223,300 S.F. SWPOZ - SOURCE WATER PROTECTION OVERLAY ZONE Salisbury, MD 21801 TITLE AND ADJACENT DEED RECORD INFORMATION. NOTE: PARCEL NUMBER: 02-05-077.13-01-4800-000 WAS REZONED Ph. 410.546.9100 CITY OF DOVER - KENT COUNTY, DELAWARE CITY OF DOVER - KENT COUNTY, DELAWARE 2. NO TITLE EXAMINATION FURNISHED TO OR PERFORMED BY THE PREPARERS HEREOF. PROPERTY SHOWN TO IO PER THE CITY OF DOVER APPLICATION Z-25-01. Fax 410.546.5824 11x17 24x36

VICINITY MAP SCALE: 1" = 1000' LOCATION MAP SCALE: 1" = 400' HEREON IS SUBJECT TO ANY RIGHT-OF-WAY, EASEMENTS, RESTRICTIONS, ETC. AS MAY BE SHOWN OR PARKING DATA 2019-184-50-Parking-Data-001 6. BUILDING SETBACKS: FRONT YARD: 10' 24x36 11x17

2-05-07713-01-5200-00001 2019184-51-V-Map-1000 2019-184-50-V-Map-400 NOTED IN ANY RECORD, PUBLIC OR OTHERWISE, OR ANY REQUIREMENT OR REGULATION OF ANY PUBLIC EXISTING CAMPUS REAR YARD: 15' Wilmington, NC AGENCY. 00-00001 T.P.: 2-05-07713-01-25 SIDE YARD: 10' 3. PORTIONS OF THE PROPERTIES SHOWN HEREON ARE LOCATED WITHIN THE SWPOZ (SOURCE WATER PARKING DATA: EXISTING: 371 GARAGE8 SPACES 13 1.99 ACRES 3205 Randall Parkway, Suite 211 1,204 ON-GRADE SPACES NOTE: A VARIANCE FROM THE 10' SETBACK LINE ALONG SOUTH Wilmington, North Carolina 28403 PROTECTION OVERLAY ZONE). HOWEVER, THE CITY OF DOVER ZONING ORDINANCE (ARTICLE 3 - 29.79), OFF-STREET PARKING PER ARTICLE 4.15: 11x17 24x36

STREET WAS GRANTED TO ALLOW THE PROPOSED BED TOWER TO 24x36 11x17

PROVIDES FOR AN EXEMPTION FROM THE REQUIREMENTS AND RESTRICTIONS OF THE SOURCE WATER 1 SPACE PER 300 S.F. OF FLOOR AREA OR TOTAL: 1,575 SPACES Ph. 910.341.7600 B.R.L. 1 PER EMPLOYEE (WHICHEVER IS GREATER) BE CONSTRUCTED OVER THE SETBACK LINE PER THE CITY OF OVERLAY ZONE BASED ON THE ABOVE MENTIONED PROPERTIES LOCATION WITHIN THE DOWNTOWN PARKING RATIO PROVIDED: 1,575/607,030 = 1 SPACE / 385 S.F. DOVER APPLICATION V-25-05. Fax 910.341.7506 DEVELOPMENT TARGET AREA. X X X POST PHASE 2 11x17 24x36 9 4. BASED ON THE FEDERAL EMERGENCY MANAGEMENT AGENCY FLOOD INSURANCE RATE MAP (FIRM), 8 13 7. BULK STANDARDS: IO - INSTITUTIONAL AND OFFICE www.beckermorgan.com 24x36 11x17

NOTE: TOTAL G.F.A. FOR PARKINGREQUIRED:1,300 EMPLOYEES = 1,300 SPACESMINIMUM AREA:10,000 SQ. FT.
SWPO
LANDS N/FX
PANEL 169 OF 435 COMMUNITY PANEL NO. 10001C0169J, DATED JULY 07, 2014, THE PROPERTY SHOWN CALCULATIONS: 623,340 S.F. 623,340 G.S.F. / 300 = 2,078 SPACES
Z
HOLDEN LEASING, LLC13
MINIMUM FRONTAGE:100 FEET
TM: 02-05-077.13-01-4000-000HEREON IS LOCATED WITHIN ZONE X (AREA OF MINIMAL FLOOD HAZARD).(EXCLUDES THE PARKING GARAGE AND8X

B.R.L.

DEED: D 4274/26MINIMUM DEPTH:100 FEET
5. BECKER MORGAN GROUP, INC. CERTIFIES THAT THERE ARE NO FRESH WATER WETLANDS LOCATED X
CENTRAL SERVICE ADDITION)PROVIDED:500 GARAGE SPACES
ZONING: C3
WITHIN THE PROPOSED IMPROVEMENTS.BUILDING HEIGHT:X150 FEET/10 STORIES
11x1724x36

1.35 AC. NUMBER OF EMPLOYEES IS EXISTING

BASEDONE STORY 1,204 ON-GRADE SPACES 24x36 11x17

FLOOR AREA RATIO:6.0
B.R.L.
BRICK BUILDING
X
ON THE LARGEST SHIFT.560 GOVERNORS
AVE.TOTAL:1,704 SPACES
20T.P.: 2-05-07713-0
1-2501-000
1.75 ACRES
MAX LOT X COVERAGE:85%
LANDS N/FNOTE: A VARIANCE FROM THE 150' HEIGHT RESTRICTION WAS
LANDS OFMENTOR PROPERTIES 1, LLC
XNOTE: A PARKING STRATEGY STATEMENT9
11x1724x36
BAYHEALTH MEDICALTM: 02-05-077.13-01-4200-000WILL BE SUBMITTED FOR REVIEW.PARKING RATIO 9PROVIDED: 1,704/623,340 = 1 SPACE / 366 S.F.GRANTED TO ALLOW THE BED TOWER TO BE CONSTRUCTED TO A24x3611x17
28CENTER, INC.DEED: D 8681/27MAXIMUM BUILDING HEIGHT OF 175' PER THE CITY OF DOVER
TM: 02-05-077.13-02-0100-000ZONING: C39
APPLICATION V-25-05.
DEED: V 48/146100.00.26 AC.SWPO10
0
R.O.W '
28LANDS N/FLANDSSTORYN/FBLDG.8.IMPERVIOUS COVERAGE:
2IO ZONING - 85% PERMITTED
ZONING: IOJCD PROPERTIES, LLCEXISTING ONE
JCDBAYHEALT
PROPERTIES,
HHUMAN RESOURCELLC
Z
11x1724x36

0.91 AC. N 03 . TM: 02-05-077.13-01-4300-000 TM:

600 GOVERNOR

S AVE.
01 4400 000
02-05-077.13-01-4400-000
EXISTING CONDITIONS:: 9.8 AC. / 13.13 AC. = 75% 24x36 11x17

° 32 T.P.: 02 05 07713

HOPE STREET5
' 40"
ES. GDEED: D 3418/95
ZONING: C3
0.77± ACRES
DEED: D 3418/95
ZONING: C3
POST PHASE 1:
POST PHASE 2:
9.8 AC. / 13.13 AC. = 75%
10.6 AC. / 13.13 AC. = 81%

PARKING

OVE0.87 AC.0.77 AC.12
POST PHASE 2:8.5 AC. / 13.13 AC. = 65%
11x1724x36
X
X
23
B.R.L
.RNO9
24x3611x17

X 168 SPACES RS C-EX-L-SHRUBS C-EX-L-TREE

B.R.L.

B.R.L C-PR-L-TREE-PS

C-PR-L-TREE-PS C-PR-L-TREE-PS

AVE.RADIUS: 1004.93'
SWPO
B.R.L.
XVANARC LENGTH: 279.86'
FIRE
11x1724x36

Z
24x36 11x17

X . B.R.L CHORD BEARING: N 4° 26' 02" W

. VAN CHORD LENGTH: 278.96' X 477.3 X 668.1 6' 7' 63.00' 11x17 24x36 24x36 11x17

9 9

LANE 5 R.O.W.

X8
B.R.L
.
9
11x1724x3624x3611x17

6 11
B.R.L.

WATER STREET

N .
FIRE LANE
11x17 24x36

10
B.R.L. 24x36 11x17

SWPO
10
Z
S. B
CATH
PO

LABNO
PARKING
7EXISTING8
RAD
FIRE
11x1724x36
LANE
F.D.C.ONE STORY1024x3611x17

B.R.L

FORB.R.L.
BRICK BUILDING
567CENTRAL SERVICES
BUILDING
EXISTING
X

D
.
7,700 S.F. FOOTPRINT: 20,800 S.F.

ST. T EXISTING AMBULANCE F.F. ELEV.: 22.16'

X

B.R.L.
11x17 24x36
BAYHEALTH - KENT CAMPUS ER ENTRANCE 24x36 11x17

EXISTING 3 STORY BRICK BUILDING FOOTPRINT : 151,500 S.F. 10

TRE
PROPOSED X
ED EXPANSION SWPO
RAMP RAMP
7 10

E
3 STORIES
PHASE 3

N 73° 21' 04" E
Z
DUMPSTER

PROPOSED

11x17 24x36 24x36 11x17

COURTYARD PHASE 2C 50.00'

X PROJECT TITLE

DEMO THE EXISTING

EMERGENCY DEPT. PROPOSED R.O.W. VAN DOCK SERVICE

2C PODIUM EXPANSION YARD

BAYHEALTH

HOP

LEGACY BUILDING EXISTING X

11x17 24x36

UPON COMPLETION OF C-PR-BLDG-OB-ED-EXPANSION-BLK OVERBUILD EXISTING ROOF TOP HELIPAD PARKING GARAGE FOOTPRINT: 28,800 S.F. 3 STORIES FIVE FLOORS - 371 SPACES FIRST FLOOR ELEV.: 29.83' 10 TRUCK DOCK 1

X X
24x36 11x17

FLOORS 2 THRU 3 PHASE 1A PHASE 2B 1A TRUCK DOCK 2 X X MEDICAL E S ALL NEW FACILITIES COURTYARD X LANDS N/F TRUCK DOCK 3 X

11x17 24x36
14" 807 BRADFORD, LLC
TM: 02-05-077.13-02-1300-000
1A 2B
Z
SWPO

B.R.L. X

LANDS OF

BAYHEALTH MEDICAL

CENTER, INC 24x36 11x17

B.R.L DEED: D 5163/270 DUMPSTER

ZONING: RGO COMPACTOR CENTER, INC.

B.R.L.
. PO
TM: 02-05-077.13-03-6400-000
C-PR-BLDG-OB-ED-BLK C-PR-BLDG-OB-SURGERY-PAVILION
C-PR-BLDG-OB-SURGERY-PAVILION

8X
DEED: 11644/304
11x1724x36

EXISTING BRIDGE 5

X
ZONING: IO KENT CAMPUS 24x36 11x17

PROPOSED 4 PO
PO
PO
PO
PO

SITE DEVELOPMENT BED TOWER OVERBUILD PO

11x17 24x36 PO
24x36 11x17

X
MASTER PLAN
PO

PO PO

FLOORS 5 THRU 10 & PENTHOUSE SWPO 32

SOUTH STRE

COURTYARD

PROPOSED

Z X
29 COURTYARD HEIGHT: 175.0'
11x17 24x36 PHASE 1B 24x36 11x17

1B
CENTRAL SERVICES X 2005024-LARSON-BLK

C-PR-BLDG-OB-BED-TOWER-BLK

10

BUILDING35640 S. STATE STREET
EXISTING2 STORIESX
CITY OF DOVER
EXISTING16
PHASE 1A
11x1724x3624x3611x17
6 STORY TOWERWELCOME35LANDS OF
KENT COUNTY, DELAWARE
2004 - 3 STORY EXPANSION
CENTER
PODIUM BUILDINGBAYHEALTH MEDICAL

B.R.L. F.F.: 29.60' 12" X 1986 ADDITION CENTER, INC B.R.L SHEET TITLE W TM: 02-05-077.13-01-1800-000 11x17 24x36 . EXISTING FIRE DEED REF.: D 2750/94 24x36 11x17

SWPOZ B.R.L. COMMAND CENTER 36 X

N 87
16 ZONING - IO
PROPOSED
COVER SHEET &
C-PR-BLDG-OB-LOBBY-BLK

° 03' MAIN ENTRY 36

SOUTH STREET X

2 STORIES

11x17 24x36

LANDS N/F

BAYHEALTH MEDICAL

PHASE 2A APPROXIMATE LOCATION OF

SOURCE WATER PROTECTION PARKING X

OVERALL LAYOUT 24x36 11x17

OVERLAY ZONE - TIER 3 (SWPOZ)

ET462 SPACES
CENTER, INC.
TM: 02-05-077.13-02-3800-000
DEED: D 130/66
2A31

11x17 24x36 X 24x36 11x17

ZONING: R832
16,150 S.F. - 0.37 AC.3
20.0'
SWPOZ
'RX
28C-PR-L-TREE-AR
5XXX
2XXX
XX
11x1724x3624x3611x17
733
13X
8
C-PR-L-TREE-PS

C-PR-L-TREE-PS

33

3VALE8X
11x1724x36
4T124x3611x17
36
579.0
6'8B.R.L.
B.R.L075150300
.6B.R.L.31X

B.R.L.
SWPOZ

11x1724x36
130.00'EXISTING24x3611x17

6 B.R.L. 29 ONE STORY X

B.R.L. BRICK BUILDING Do Not Explode - Select Scale EX. TW B.R.L5 . 6 0 FRAMED STORY HOUSE 6,200 S.F. X SCALE: 1" = 150' 11x17 24x36 EX. TWO STORY 50.00' 24x36 11x17

BRICK HOUSE3
60.00PROPOSED(OFFICE)R.O.W.5XISSUE BLOCK

B.R.L.
' 20
R.O.W B.R.L
. PARKING GARAGE
B.R.L.
.

658.85'
11x17 24x36
4 STORIES - 500 SPACES X 24x36 11x17

S 01 X ° 34' 34" W PHASE 2A LANDS N/F EX. 3 STORY BAYHEALTH MEDICAL BRICK BUILDING Commons 2005-198-State-Street- X

X
20.00' 2A CENTER, INC.
TM: 02-05-077.13-01-1801-000 7,200 S.F. FOOTPRINT
530 S. STATE ST.
SWPO
11x17 24x36 24x36 11x17

PLATBOOK: 27-00018 X
LANDS N/F
CHURCH OF THE HOLY CROSS S. S Z ZONING: IO
1.30 AC.
X
TM: 02-0-077.13-01-5600-000 TAT B.R.L. 41.50' B.R.L.
TS

E S
C-PR-BLDG-OB-GARGE-BLK

20.00'
DEED: Q 20/165
FCM TRE
11x17 24x36 24x36 11x17

ZONING: IO

25.00' X B.R.L. X 11.3 AC. ET 70.00' . GENERAL SCOPE OF PROJECT . . . R.O.W 2019-184-50MP-Scope

60.00'
11x17 24x36 24x36 11x17

. RADIUS: 1402.69' MARK DATE DESCRIPTION

BAYHEALTH MEDICAL CENTER IS PROVIDING A SITE DEVELOPMENT MASTER PLAN WHICH IS TO BE X Z SWPO ARC LENGTH: 402.65' R.O.W. LAYER STATE: C-101MP CONSTRUCTED IN 3 PHASES. CHORD BEARING: S 6° 18' 06" E PHASE 1A: CONSTRUCT A TWO-STORY EXPANSION (OVERBUILD) OVER THE EXISTING EMERGENCY X CHORD LENGTH: 401.27' PROJECT NO.: 2019184.50 11x17 24x36

DEPARTMENT. 24x36 11x17

PHASE 1A: CONSTRUCT AN ADDITION TO THE EXISTING CENTRAL SERVICES BUILDING. DATE: 2025-12-04 X PHASE 1B: CONSTRUCT A SIX-STORY BED TOWER (OVERBUILD) OVER THE EXISTING FOUR-STORY BED TOWER. SCALE: AS SHOWN FCM Do Not Explode

  • •Select Scale

11x17 24x36 PHASE 2A: CONSTRUCT A NEW FIVE-STORY, 500 PARKING SPACE PARKING GARAGE. PHASE 2A: CONSTRUCT A NEW TWO-STORY MAIN ENTRY AND NEW DROP-OFF AREA CONNECTING TO THE NEW X 16 15 LANDS N/F DRAWN BY: M.A.R. PROJ. MGR.: M.A.R 24x36 11x17

VA LANDS N/F
PARKING GARAGE TO THE HOSPITAL. N
14MATTHEW PERZA
SHEET

CE
BAYHEALTH MEDICAL
C-EX-PARKING-SPACE-NO-T SCULL SWPO
TM: 02-05-077.09-05-7101-000

SCULL TERRA D PHASE 2B: DEMOLISH THE EXISTING PARKING GARAGE AND CONSTRUCT A THREE-STORY SURGERY CENTER. X CENTER, INC DEED: D 8452/199 59

PRIVATELY MAIN
PARKING
C-001
Z

11x1724x36
PHASE 2C: CONSTRUCT A THREE-STORY EMERGENCY DEPARTMENT EXPANSION.TM: 2-05-077.13-01-5100-000ZONING: R8
1324x3611x17

DEED REF.: D 12603/324 0.13 AC. 11 PHASE 3: DEMOLISH THE EXISTING LEGACY BUILDING UPON THE COMPLETION OF ALL THE NEW FACILITIES. X ZONING - IO 433 SPACES COPYRIGHT 2025 Xref- FIP 1998

Bayhealth MP - C-001 - 24x36-60 - 2025-11-19 184-H F:\AutoCAD\Projects\2019\2019184-43\DWG\2019-184-43-BayHealth-Dover-Master.dwg, Dec 04, 2025 - 1:57pm

Engineers Signature - Seal Frozen
11x17 24x36 24x36 11x17

oly-C TAINE ross XX-XX-XX 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36

11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17 11x17

Página 60

Item 3.

SITE PLAN MASTER PLAN EXISTING CAMPUS

SOU
TH G
OVER
NORS
AVEN
UE

HOP PROPE RT Y LINE

ES
LEGACY ED

TRE
AMBULANCE
BUILDINGS
ET EXISTING
GARAGE

CSB

H 10’ SETBACK EXISTING GARAGE

PODIUM BUILDING 1986

ADDITION GARAGE

HOSPITAL

EET

SOUTH STR
LEGEND
LEGACY BUILDINGS SOU
TH S
TAT
ESTRE
ET

Bayhealth Kent Campus Expansion VERTICAL
MASTER PLAN INTEGRATION PROJECT
Dover, Delaware

2025. 07. 21.
11.11.2025 106

60

Página 61

Item 3.

SITE PLAN MASTER PLAN PHASE 1

SOU
TH G
OVER
N ORS
AVEN
UE

HOP PROPE RT Y LINE

ES
LEGACY ED

TRE
AMBULANCE
BUILDINGS
ET EXISTING
ED GARAGE
ENTRY
CSB

H 10’ SETBACK
ED
OVERBUILD
EXISTING
GARAGE
CSB
EXPANSION

EXISTING CORE TOWER NEW ELEVATORS

OVERBUILD AND STAIRS

1986

ADDITION GARAGE

HOSPITAL

EET

SOUTH STR LEGEND LEGACY BUILDINGS SOU TH S TAT PHASE 0 ESTRE ET PHASE 1 20’ S ETBA CK PRO 1 PERT 0’ SETBA Y LIN CK E

Bayhealth Kent Campus Expansion VERTICAL
MASTER PLAN INTEGRATION PROJECT
Dover, Delaware

2025. 07. 21.
11.11.2025 306

61

Página 62

Item 3.

SITE PLAN MASTER PLAN PHASE 2

SOU
TH G
OVER
N ORS
AVEN
UE

HOP
PROPE
RT Y LINE
AMBULANCE ED

ES LEGACY TRE BUILDINGS ET CANOPY BELOW EXISTING CSB ED H 10’ SETBACK EXPANSION ED PODIUM OVERBUILD EXPANSION CSB EXPANSION

EXISTING CORE TOWER NEW ELEVATORS

OVERBUILD AND STAIRS

1986

ADDITION MAIN
ENTRY
+
PATIENT
DROP-OFF
HOSPITAL

VALE GARAGE

EET T

SOUTH STR AMB U STA LETTE ND-B AMBULETTE Y PA RKING DROP-OFF LEGEND LEGACY BUILDINGS SOU NEW PARKING TH S

PROPERTY LINE
PHASE 0
TAT
ES GARAGE
TRE
ET 513 SPACES

10’ SETBACK
PHASE 1
PHASE 2A
PHASE 2B
PHASE 2C

Bayhealth Kent Campus Expansion VERTICAL
MASTER PLAN INTEGRATION PROJECT
Dover, Delaware

2025. 07. 21.
11.11.2025 406

62

Página 63

Item 3.

SITE PLAN MASTER PLAN PHASE 3 (FINAL STATE)

SOU
TH G
OVER
N ORS
AVEN
UE

HOP
PROPE
RT Y LINE
AMBULANCE ED

ES DEMO THE EXISTING
TRE LEGACY BUILDINGS
ET
CANOPY BELOW

UPON COMPLETION EXISTING
CSB
ED
OF ALL NEW FACILITIES

H 10’ SETBACK
EXPANSION ED PODIUM
OVERBUILD
EXPANSION
CSB
EXPANSION

EXISTING CORE TOWER NEW ELEVATORS

OVERBUILD AND STAIRS

1986

ADDITION MAIN
ENTRY
+
PATIENT
DROP-OFF
HOSPITAL

VALE GARAGE

EET T

SOUTH STR AMB U STA LETTE ND-B AMBULETTE Y PA RKING DROP-OFF LEGEND LEGACY BUILDINGS SOU NEW PARKING TH S

PROPERTY LINE
PHASE 0
TAT
ES GARAGE
TRE
ET 513 SPACES

10’ SETBACK
PHASE 1
PHASE 2A
PHASE 2B
PHASE 2C
DEMOLITION

Bayhealth Kent Campus Expansion VERTICAL
MASTER PLAN INTEGRATION PROJECT
Dover, Delaware

2025. 07. 21.
11.11.2025 506

63

Página 64

Item 3.

MASTER PLAN RENDERINGS SITE PLAN

Bayhealth Kent Campus Expansion VERTICAL
PHASE 1 INTEGRATION
TOWER OVERBUILD PROJECT
SE VIEW
Dover, Delaware

2025. 07. 21.
11.26.2025 606

64

Página 65

Item 3.

MASTER PLAN RENDERINGS SITE PLAN

PHASE 2A PARKING GARAGE

Bayhealth Kent Campus Expansion VERTICAL
PHASE 2A INTEGRATION
PARKING GARAGE PROJECT
FROM STATE STREET NORTH
Dover, Delaware

2025. 07. 21.
11.26.2025 706

65

Página 66

Item 3.

MASTER PLAN RENDERINGS SITE PLAN

PHASE 2A PHASE 1 PARKING GARAGE TOWER EXPANSION

Bayhealth Kent Campus Expansion VERTICAL
PHASE 2A INTEGRATION
PARKING GARAGE FROMPROJECT
Dover, Delaware STATE STREET / SOUTH STREET CORNER
2025. 07. 21.
11.26.2025 806

66

Página 67

Item 3.

MASTER PLAN RENDERINGS SITE PLAN

PHASE 2A PARKING GARAGE

Bayhealth Kent Campus Expansion VERTICAL
PHASE 2A INTEGRATION
PARKING GARAGE PROJECT
FROM STATE STREET SOUTH
Dover, Delaware

2025. 07. 21.
11.26.2025 10
06

67

Página 68

Item 3.

MASTER PLAN RENDERINGS SITE PLAN

PHASE 1 PHASE 2B PHASE 1 TOWER EXPANSION PODIUM EXPANSION ED OVERBUILD

Bayhealth Kent Campus Expansion VERTICAL
PHASE 2B INTEGRATION
PODIUM EXPANSION PROJECT
FROM GOVERNORS AVE NORTH
Dover, Delaware

2025. 07. 21.
11.26.2025 12
06

68

Página 69

Item 3.

MASTER PLAN RENDERINGS SITE PLAN

PHASE 2B PHASE 1 PHASE 1 PODIUM EXPANSION TOWER EXPANSION ED OVERBUILD

Bayhealth Kent Campus Expansion VERTICAL
PHASE 2B INTEGRATION
PODIUM EXPANSION PROJECT
/ ED OVERBUILD FROM
Dover, Delaware GOVERNORS AVE SOUTH
2025. 07. 21.
11.26.2025 14
06

69

Página 70

Item 4.

City of Dover
DATA SHEET FOR SITE PLAN REVIEW

DEVELOPMENT ADVISORY COMMITTEE MEETING OF January 7, 2026

PLANNING COMMISSION MEETING OF January 20, 2026

Plan Title: R.E. Pierson Regional Headquarters – 30 Lafferty Lane S-26-02

Plan Type: Site Development Plan

Location: South side of Lafferty Lane; Northwest corner of Lafferty Lane and Cassidy Drive and southeast of Old Lafferty Road in Dover, DE

Owner: Richard E. Pierson Construction Co.

Addresses: 30 Lafferty Lane Dover, DE 19901

Tax Parcel: ED-05-077.00-01-28.03-000

Size: Full Parcel – 1,289,964 +/- square feet (29.6135 +/- acres) Project Area - 230,184 +/- square feet (5.284 +/- acres)

Present Uses: Vacant agricultural field

Proposed Use: Construction contractor office, garage, and Contractor work yard for equipment storage

Zoning: M (Manufacturing Zone)
AEOZ (Airport Environs Overlay Zone)
APZ I (Accident Potential Zone I)
Noise Zone A

Building Area: Office: 9,900 SF
Garage: 9,600 SF
Total: 19,500 SF

Onsite Parking: 19 total vehicle parking spaces: 18 standard parking spaces, 1 ADA parking spaces, and 2 bicycle spaces (1 rack)

Waiver Requests: Partial Elimination of Upright Curbing Elimination of Sidewalk Installation Requirements

For Consideration: Performance Standards Review Application

  • P.O. Box 475 Dover, DE 19903 70 Community Excellence Through Quality Service

Página 71

Item 4.

CITY OF DOVER

City of
DEVELOPMENT ADVISORY COMMITTEE Dover
Planning
APPLICATION REVIEW COMMENTARY Office

D.A.C. MEETING DATE: January 7, 2026

APPLICATION: R.E. Pierson Regional Headquarters, Review of a Site Development Plan at 30 Lafferty Ln, Dover DE

FILE #: S-26-02 REVIEWING AGENCY: City of Dover Planning

CONTACT PERSON: Dawn Melson-Williams, AICP PHONE: 302-736-7196

Note: This Review Report was initially prepared by Staff of the Rossi Group (under a Planning Services contract with the City of Dover). The Report was completed with additional review and editing by the City’s Planning Office.

  • I.PLAN SUMMARY

This Application is for Review of a Site Plan Application to permit the construction of R. E. Pierson Regional Headquarters to consist of a 9,900 SF Office Building, a 9,600 SF Garage with a fenced Contractors Work Yard (laydown and equipment storage) area, and associated site improvements. The project development area is 5.284 acres of the overall parcel of 29.6135 acres. The property is zoned M (Manufacturing Zone) and is subject to the AEOZ (Airport Environs Overlay Zone): Accident Potential Zone I (APZ I) and Noise Zone A. The property is located on the south side of Lafferty Lane between Bay Road and Horsepond Road. The owner of record is Richard E. Pierson Construction, Co. Property Address: 30 Lafferty Lane. Tax Parcel Number: ED-05-077.00-01- 28.03-000. Council District 2.

Preliminary Land Use Services Review (PLUS): The PLUS Review is required by a City of Dover Memorandum of Understanding (MOU) for certain types of projects. As the proposed structure area is less than 75,000 SF, this project was not required to complete PLUS Review process. It is noted that a previous application for development of the parcel as warehouses was reviewed in PLUS Review #2021-08-04 (C-21-07 Lands of First State Business Center, LLC: Two Buildings at 30 Lafferty Lane).

II. PROJECT DESCRIPTION

The application proposes construction of a contractor construction office with garage warehouse/storage yard in the City of Dover. The property is located on the south side of Lafferty Lane between Bay Road and Horsepond Road. The plan proposes construction of a new 9,900 SF single-story Office Building as the regional headquarters for R.E. Pierson and a 9,600 SF garage with surrounding construction yard behind the office, a 19-vehicle parking lot, landscaping, and stormwater management features. The proposed site access will connect to Lafferty Lane on the north side of the site.

71

Página 72

Item 4. S-26-02 Site Plan for R.E. Pierson Regional Headquarters at 30 Lafferty Ln DAC Report of January 7, 2026

Surrounding Land Uses The subject property is located northwest of Dover Air Force Base and southeast of the intersection of Lafferty Lane and Old Lafferty Lane. The site is bordered by properties along Cassidy Drive to the east and Lafferty Lane along the north/northwest/west bend. The applicant is seeking to currently develop only the northeast portion of the overall lot, with anticipated development of the remaining parcel area to occur in the future. The parcel is zoned M (Manufacturing Zone) with eastern portions of the parcel within the Airport Environs Overlay Zone (AEOZ) - APZ-I and Noize Zone A (65 DBL Zone). Properties immediately adjacent to the subject project location are also zoned M. The subject parcel is vacant and contains no existing structures and previously was a field in agricultural crop tillage. Surrounding uses are also zoned M (Manufacturing Zone). The closest commercial businesses are located along the east side of Cassidy Drive as part of the Cassidy Commons with four buildings as multi-tenant flex/warehouse spaces. Two residential properties, zoned R-20, are located across from the parcel (392 & 420 Lafferty, respectively), as well as an undeveloped Zone M zoned lot owned by the State of Delaware, and a planned industrial/warehouse that is currently under development referred to as Dover Industrial (Site Plan S-24-13 and S-25-10). The subject property is north of Dover Air Force Base.

Previous Applications This property was most recently approved for development as C-21-07 Lands of First State Business Center, LLC Two Warehouse Buildings (Dover Logistics Center) at 30 Laferty Lane by Planning Commission in November 2021 and with Final Plan approval in April 2023; the Plan has expired.

This site was previously the subject of applications SB-05-03 Conceptual Subdivision Plan and Preliminary Subdivision Plan which proposed subdivision of the land totaling thirty (30) acres ± into thirteen (13) parcels. These Subdivision Plans were reviewed by the Planning Commission in August 2005 and February 2007. At its meeting of July 16, 2007, the City of Dover Planning Commission granted a six-month extension to the SB-05-03P Preliminary Subdivision Plan for Lands of First State Business Center. However, action was not taken to finalize the Subdivision Plan and it expired in February 2008.

III. ZONING REVIEW

M (Manufacturing Zone) The subject property is zoned M (Manufacturing Zone). Article 3 §19 of the Zoning Ordinance details the permitted uses within the M (Manufacturing Zone Zone). Based upon the uses permitted in this zone, the proposed use as a building contractors' yard is permitted. The zoning requires the screening of any outdoor storage areas. Article 4, §4.16 provides the bulk standards for the M zone. The subject property fronts one street, Lafferty Lane.

Required Provided (Project Area)

Lot Width 100 ft. >100 ft.

Lot Depth 150 ft. >150 ft.

Front Yard Setback 40 ft. 101.75 ft.

Side Yard Setback 20 ft. >20 ft.
72

Página 73

Item 4. S-26-02 Site Plan for R.E. Pierson Regional Headquarters at 30 Lafferty Ln DAC Report of January 7, 2026

Rear Yard Setback 20 ft. > 20 ft.

Building Height No limit/60 ft. 1 story/17.5 ft.

Floor Area Ratio (FAR) 0.5 0.086 (project area) 0.015 (total area)

Impervious (Lot) Coverage 85% 31.43 % (project area) 5.61% (total site)

Airport Environs Overlay Zone (AEOZ) The eastern half of the subject property is zoned AEOZ (Airport Environs Overlay Zone). Article 3 §22 of the Zoning Ordinance details the permitted uses within the AEOZ (Airport Environs Overlay Zone). Article 3 Section 22.6 provides a Land Use Compatibility Table that specifically lays out permitted as well as restricted uses within the various Airport Environs Overlay Zones. Based upon the uses permitted in the AEOZ zone, the proposed use is classified as contract construction services under the Standard Land Use Coding Manual (SLUCM) and is permitted with additional restrictions applied. The AEOZ is comprised of two basic regulatory components: accident potential zones (APZ) and noise zones. The project area within the parcel falls within APZ I, which requires contract construction services to: (1)“Require NLR of noise zone and building location and site planning, and design and use of berms and barriers can help mitigate outdoor exposure, particularly from near ground level sources. Measures that reduce outdoor noise should be used whenever practical in preference to measures which only protect interior spaces. (2) “Facilities shall be low intensity”.

The project area within the parcel also falls within Noise Zone A (DNL A), which requires that contract construction services incorporate Noise Level Reduction (NLR) and noise attenuation measures into the design and construction of the structures to achieve an NLR (outdoor to indoor) of 25dB.

Article 3 §22.7(a) states that “all buildings and structures to be constructed or placed within the AEOZ shall be situated on the portion of the lot that affords the least noise impact to the proposed building or structure.” Portions of the southeast corner of the Garage Building are within DNL A Zone. Shifting the Garage Building slightly west would remove the building entirely from the DBL Zone and would have less noise exposure.

Article 3 §22.8(f) prohibits “uses that attract birds or waterfowl, such as, but not limited to, landfills, wastewater treatment facilities, and associated settling ponds…” within the APZ I Zone. As the plan shows a stormwater management pond/facility on the site, the pond/facility must be designed to meet this requirement.

IV. PARKING SUMMARY

The Manufacturing Zone includes a minimum parking requirement. Article 4 §19 of the Zoning Ordinance requires that parking is calculated at 1 parking space per 800 SF floor area. Available ADA parking is calculated at 1 space if at or below 25 required standard parking spaces. Based on the submitted plans of the proposed Office area (9,900 SF), a minimum of 13 standard parking spaces and one (1) ADA space would be required. The Plans submitted include 19 total parking spaces: 18 standard and one (1) ADA parking space. The Garage Building does not appear to be included in 73

Página 74

Item 4. S-26-02 Site Plan for R.E. Pierson Regional Headquarters at 30 Lafferty Ln DAC Report of January 7, 2026

the parking calculation. This may be authorized if the building usage consists of vehicle/equipment parking and service bays. The paved work yard area surrounding the Garage Building will allow for loading space and storage opportunities. The area is fenced.

Bicycle Parking Bicycle parking shall be provided for parking spaces at a rate of one (1) bicycle parking space for every twenty (20) parking spaces. Based on the 19 parking spaces provided, one bicycle space is required. The Plans submitted include 2 bicycle parking spaces (1 bicycle rack).

  • V.SITE CONSIDERATIONS

Site Access The site layout provides vehicle access from Lafferty Lane. The proposed Site Plan connects to the roadway with a single, dedicated (25-foot-wide) entrance/exit point on Lafferty Lane. Since Lafferty Lane is a Statement maintained roads, Entrance Plan approval for the site entrance is required from DelDOT.

Planning Staff notes that the adjacent property to the east known as Cassidy Commons includes a private street known as Cassidy Drive and a proposed street (named Construction Drive). A portion of Cassidy Drive has been constructed as is privately maintained. Construction Drive, which runs east-west, was to provide cross-access to the adjoining properties such as this one. This street was initially proposed to facilitate access to any potential future developments on the sites immediately to the east and west of the subject site and become part of a larger street network in the general area. Construction Drive has not been built. In the review of Application C-21-01 for the continued buildout of Cassidy Commons, the Planning Commission required the construction of this street prior to issuance of the permits for Building 7 of the Cassidy Commons project; the Plan has not proceeded. Construction Drive was shown labeled as cross-access easement and as a proposed 60 ft. right-of-way on a Record Plan recorded in April 2012 (KCRD Plat Book 117 page 56). This proposed street of Construction Drive offers an opportunity for cross-access between properties; however, it appears to be located south of the current project’s development area.

Pedestrian Site Access The Site Plan shows existing sidewalk on Lafferty Lane, but only to the east of Cassidy Drive. The subject site will provide a sidewalk along Lafferty Lane along the frontage of the project area only. A frontage sidewalk is required on the entire street frontages; however, the applicant has submitted a waiver request to only construct portions of sidewalk in front of the project area and not the entire parcel; see discussion below. The plan shows a sidewalk connecting to the frontage sidewalk to provide access into the site.

Trash Collection This site will utilize private trash collection. The Zoning Ordinance requires two (2) dumpsters per property for nonresidential uses. The applicant proposes two (2) external dumpsters within the Construction Work Yard at the northeast corner of the garage area.

Waiver Request: Elimination of Sidewalk Installation Requirements The applicant has submitted an attached request to eliminate the sidewalk installation requirements along the west-side frontage portion of the project under Article 5 §18.2 of the Zoning Ordinance. The waiver request would be to limit the required portions of the sidewalk to only the current project area frontage along Lafferty Lane (5.284 acres) and not the entirety of the 29.6135-acre parcel. There 74

Página 75

Item 4. S-26-02 Site Plan for R.E. Pierson Regional Headquarters at 30 Lafferty Ln DAC Report of January 7, 2026

are currently no sidewalks along the southern portion of Lafferty Lane from the Bay Road intersection to the eastern portion of this property line. The remainder of the parcel not in the project area is intended to be left for future development and the applicant requests that those portions of sidewalk be developed when those areas are also developed. Additionally, the applicant states that the proposed project is a contractor office with equipment storage/garage and would likely not generate additional pedestrian traffic that would necessitate sidewalk access.

Waiver Request: Partial Elimination of Upright Curbing The applicant has submitted an attached request to eliminate portions of the perimeter upright curbing along the driveway to the Garage Building and storage area (once past the parking lot) omitting an upright curb as required by Article 6 §3.6(b) of the Zoning Ordinance. The applicant is proposing to keep the curbing along the entrance and into the surface parking area in front of the Office Building. As there is a stormwater management pond onsite, the applicant is requesting the removal of some perimeter curbing to allow for sheet flow off the pavement into the swales and pond, and thus curbing would not be needed in those areas to direct drainage to an inlet.

VI. BUILDING ARCHITECTURE

The application proposes a construction Office Building and Garage/warehouse Building. The proposed one-story office building will be 17 feet 6 inches tall with a standing-seam metal pitched roof centered over the front door. The proposed building will feature two main material palettes for the metal wall panels. The first includes four-foot-tall dark gray tones lower wainscoting around the perimeter with matte black metal trim and window frames. The second includes beige/tan vertical metal panels along the front/sides/back above the dark grey wainscotting. The Office building’s front will include a pent roof porch along the entire length with black trim and evenly spaced black posts. The rear entrance will have a black awning only over the door with natural wood-colored posts. The garage has similar material palettes but the roof will not be as steeply pitched. The Garage Building will have two vehicle entrances, each on both the front and rear with large black doors.

Any signage or branding shown on the architectural elevations is not considered as part of the Site Plan review. A separate application for sign permits is required. All signage must comply with the requirements of Article 5 §4 Sign Regulations. While all signage submitted has not been reviewed for compliance with Article 5 §4, please note the following:

  • •The sign near the front site entrance on page C-201 of the proposed Site Plan is listed as a monument sign. Monument signs are “a low freestanding sign that is affixed to a base that is equal to or wider than the sign itself.” The height of the sign is to be measured from the finished grade to the top of the sign.

VII. TREE PLANTING AND LANDSCAPE PLAN

Tree Planting Requirements The Zoning Ordinance requires tree planting at a rate of one tree per 3,000 SF of non-woodland development area. Based on the total non-woodland area for entire site area of 230,184 SF, 77 trees are required to be planted. The applicant will plant 77 new trees as part of landscape development. The trees are located throughout the development with concentrations along the street frontage, along the entrance drive, and as screening on the west and south sides of the Work yard area, and for part of the east property line. The trees include a variety of deciduous, evergreen, and ornamental

75

Página 76

Item 4. S-26-02 Site Plan for R.E. Pierson Regional Headquarters at 30 Lafferty Ln DAC Report of January 7, 2026

trees. The balance of the property appears to be proposed as a grass planting which may be designated as a meadow area.

VII. PERFORMANCE STANDARDS REVIEW

Uses in the M Zone are subject to the Performance Standards Procedure set forth in the Zoning Ordinance, Article 5, Section 8.1 and 8.2 and referenced sections. Article 5 §8.1 Dangerous and objectionable elements. No land or building in any zone shall be used or occupied in any manner so as to cause any one or more of the following conditions to exist and to be dangerous, injurious, noxious or offensive beyond the boundaries of such premises in such a manner or in such amount as to adversely affect the reasonable use of the surrounding area or adjoining premises: Fire, explosive or other hazard; noise, or vibration; smoke, dust, odor or other form of air pollution; heat, cold, dampness or electromagnetic disturbance; glare, liquid or solid refuse or waste; traffic congestion causing roadways or intersections in the surrounding highway network to fall below acceptable levels of comfort and convenience; or other substance, condition or element (referred to hereinafter as "dangerous or objectionable elements"), provided that any use permitted or not expressly prohibited by this ordinance may be undertaken and maintained if it conforms to the regulations of this section limiting dangerous and objectionable elements at the point of the determination of their existence.

The project’s compliance with a series of performance standards for the “dangerous and objectionable elements” had previously considered by the Planning Commission. The “dangerous and objectionable elements” are as follows:

  • •Fire and explosion hazards (activities with and storage of)
  • •Radioactivity or electromagnetic disturbance
  • •Noise (sound pressure level)
  • •Vibration
  • •Smoke
  • •Odors (Odorous gases or odorous matter)
  • •Fly ash, dust, fumes, vapors, gases and other forms of air pollution
  • •Glare (from lighting or high temperature processes)
  • •Liquid or solid wastes
  • •Traffic congestion (Level of Service E)

The project cannot cause the above conditions to exist so that they adversely affect the surrounding areas or adjoining properties. The specific limits of each performance standard are described in the Zoning Ordinance. Where the performance standards conflict with regulations established by other state or local agencies such as the Delaware Department of Natural Resources and Environmental Control (DNREC), the more restrictive regulations apply.

As part of this procedure, a Performance Standard Review Application is required to accompany this Plan submission for review and approval. The Applicant has submitted a Performance Standard Review Application Letter indicating how the proposed development would restrict the emission of dangerous and objectionable elements detailed in Article 5, Section 8.5.

VIII. CITY AND STATE CODE REQUIREMENTS:

The subject proposal has been reviewed for code compliance, plan conformity, and completeness in accordance with the agency’s authority and area of expertise. The following items have been identified as elements which need to be addressed by the applicant: 76

Página 77

Item 4. S-26-02 Site Plan for R.E. Pierson Regional Headquarters at 30 Lafferty Ln DAC Report of January 7, 2026

  • 1)A Performance Standard Review Application is required to accompany this Plan submission for review and approval by the Planning Commission. The applicant has submitted a Performance Standard Review Application Letter to the Planning Office indicating how the proposed development would restrict the emission of dangerous and objectionable elements detailed in Zoning Ordinance, Article 5, Section 8.5.
  • 2)Since a portion of the required street frontage sidewalk is not shown to be provided, a Waiver Request to eliminate that segment was submitted for consideration by the Planning Commission. Please be aware that DelDOT may have separate requirements regarding this sidewalk/pathway segment.
  • 3)Upright curbing must be provided around all parking areas and circulation drives unless a waiver is granted by the City Planner. The City Planner is accepting the partial elimination of curbing as related to stormwater facility design.
  • 4)Sheet C-001 Cover Sheet and Overall Site Plan
  • a)In the Site Data column and the plan, please update the building areas. The proposed building area differs for the size of the Garage as there are references to the office (9,900 SF) and the garage (9,900 SF). The garage area is also listed as 9,600 SF +/- for a total building area of 19,500 SF +/-. The applicant has confirmed the Garage Building size to be 9,600 SF; this correction should be applied to all sheets.
  • b)The Site Data column indicates an existing building area of 9,900 SF. There is currently not a building on the site, so this needs to be corrected.
  • 5)Landscape Plan
  • a)The street frontage trees should be clearly located on the subject parcel. Ensure tree planting locations do not conflict with fire hydrants and also maintain separation distances from utilities lines. The current plans show potential conflicts with light poles.
  • b)Clarify is balance of site is proposed as a meadow area.
  • 6)If easements, right-of-way dedication, or changes to lot lines are included, please provide a record plan sheet. There was a previous Record Plan with C-21-07; this may need to be updated if easements, etc. are changing with this Plan. Currently no subdivision of the property into multiple lots is proposed.
  • 7)Provide construction details for the following items but not limited to, dumpster enclosure, traffic control signage, lighting fixtures, bicycle racks, handicap signage, etc.
  • 8)Consideration should be given to addressing the future multiple buildings on this site in general. This can be proposed in coordination with the City’s Tax Office and GIS Section.
  • 9)The construction of the site entrances and street improvements to Lafferty Lane must comply with the requirements of DelDOT.
  • 10)Erosion & Sediment Control Plans and Stormwater Management Plans granted approval by the Kent Conservation District and Delaware Sediment and Stormwater Management regulations must reflect the Site Plan layout and design conditionally approved by the Planning Commission and be in compliance with the Zoning Ordinance and technical review requirements of other agencies. 77

Página 78

Item 4. S-26-02 Site Plan for R.E. Pierson Regional Headquarters at 30 Lafferty Ln DAC Report of January 7, 2026

  • 11)The Final Plan set must include notes documenting any action taken by the Planning Commission on the requested waivers and must list any additional conditions of approval.
  • 12)The Building Plans must include designs that provide an NLR (outdoor to indoor) of 25dB.

IX. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES:

In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in considering and acting upon Site Development Plans may prescribe appropriate conditions and safeguards so that the public health, safety, and welfare, the comfort and convenience of the public in general, and the residents of the immediate neighborhood in particular shall be taken into consideration. These safeguards may to the maximum extent possible further the expressed intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed in subsections 2.21 to 2.28.

  • 1)Waiver Request - Elimination of Sidewalk Installation Requirements: In accordance with Zoning Ordinance, Article 5 §18.2, the applicant has requested a waiver from the installation of frontage sidewalk along the entire length of the parcel, proposing to limit sidewalk installation to within the project area. Staff notes that Lafferty Lane is a State-maintained road, and DelDOT will likely require a sidewalk along the entire frontage of the property. Even if the Planning Commission grants a sidewalk waiver, the applicant will need to comply with DelDOT requirements. Planning Staff encourages the installation of sidewalk at least within the development area as other property/projects along Lafferty Lane are beginning the construction of a pathway system along this roadway.
  • 2)Waiver Request - Elimination of Upright Curbing: In accordance Article 6 §3.6 (b) of the City of Dover zoning standards, upright curbing requirements can be relaxed for portions of a parking area when there is a demonstrated need to convey stormwater to a proposed SWM area. As the plan proposes sheet flow drainage into onsite swales and a stormwater pond/facility, the City Planner has granted the waiver for upright curbing in these areas.
  • 3)Stormwater Requirement – Dry Pond Design: In accordance with Article 3 §22.8 (f) of the Zoning Ordinance, land uses that attract birds or water fowl (such as, but not limited to, landfills, wastewater treatment facilities, and associated settling ponds, artificial marshes, dredge spoil materials, sand and gravel dredging operations and open fish farming) are prohibited within the CZ, APZ I and APZ II zones of the AEOZ. As the plan includes a stormwater/sediment pond within this zone, staff recommends that the pond design be designed as a dry pond so as not to hold water and/or attract birds. The SWM plan would need to confirm all continued stormwater requirements given this design stipulation. Staff recommends that the applicant coordinate with the Dover Air Force Base regarding the pond design.
  • 4)Garage Building Location – Noise Zone: In accordance with Article 3 §22.7 (a) of the Zoning Ordinance, buildings should be situated on the portion of the lot that affords the least noise impact to the building whenever practicable. Please evaluate whether the Garage Building could be shifted slightly west to avoid the Noise Zone and clarify the specific uses within this Building.
  • 5)Consideration of Performance Standards Review Application: Planning Staff recommends 78

Página 79

Item 4. S-26-02 Site Plan for R.E. Pierson Regional Headquarters at 30 Lafferty Ln DAC Report of January 7, 2026

approval of the Performance Standards Review, believing it sufficiently demonstrates the intent to comply with the restrictions as provided in Zoning Ordinance, Article 5 Section 8.1 and 8.2.

  • 6)Connectivity to Construction Drive (Proposed Street): Staff recommends evaluating the location of the right-of-way for Construction Drive found on the Cassidy Commons property to the east. The subject site could determine the feasibility of a potential connection to the proposed street as part of a larger circulation network for this area on the south side of Lafferty Lane.
  • X.ADVISORY COMMENTS TO THE APPLICANT:
  • 1)The Planning Commission should act upon the request for the sidewalk waiver as part of any motion regarding this project application, or as a separate motion as necessary. Note: The sidewalk waiver is at the discretion of the Planning Commission. The Commission may approve or deny waiver requests.
  • 2)The Dover Air Force Base would be a source of information relating to FAA Bird Mitigation for properties in the flight path for the Air Base, population density suggestions in the APZ I & II zones, as well as submission to DelDOT for the State Office of Aeronautics requirements.
  • 3)Land Use Compliance: Any uses of the site and the buildings are subject to compliance with the allowable uses of the M (Manufacturing Zone) and the AEOZ (Airport Environs Overlay Zone) Land Use Compatibility Table. Evaluation of each use will occur as part of the Permit process for construction activity or for establishment of a use and also as part of the Business Licensing program.
  • 4)In the event that major changes and revisions to the Site Plan occur in the finalization of the Plan contact the Department of Planning and Inspections. Examples include relocation of site components like paving and increases in building footprint. These changes may require resubmittal for review by the Development Advisory Committee, Planning Commission, or other agencies and commissions making recommendations in regard to the Plan.
  • 5)Following Planning Commission approval of the Site Plan, the Plan must be revised to meet all conditions of approval from the Development Advisory Committee or as otherwise noted. A Check Print must be submitted for review to Planning Office Staff and to the other commenting agencies. Upon determination that the Plan is complete and all agency approvals have been received; copies of the Plan may be submitted for final endorsement (Final Plan Approval).
  • 6)Other agencies and departments which participate in the Development Advisory Committee may provide additional comments related to their areas of expertise and code requirements.
  • 7)The applicant/developer shall be aware that prior to any ground disturbing activities on the site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections and permits are required.
  • 8)For building new construction, the requirements of the building code and the fire code must be complied with. Consult with the Building Inspections Staff and City of Dover Fire Marshal for these requirements. The resolution of these items may impact the site design including such 79

Página 80

Item 4. S-26-02 Site Plan for R.E. Pierson Regional Headquarters at 30 Lafferty Ln DAC Report of January 7, 2026

items as building dimensions and height, building openings, and fire protection needs, etc.

  • 9)The applicant shall be aware that Site Plan approval does not represent a Building Permit and associated construction activity permits. A separate application process is required for issuance of a Building Permit from the City of Dover. Building Permits will be required for each building.
  • 10)The applicant shall be aware that Plan approval does not represent a Sign Permit, nor does it convey permission to place any sign on the premises. Any proposed site or building identification sign may require a Sign Permit from the City of Dover prior to placement of any such sign in accordance with Zoning Ordinance Article 5 §4.

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Office as soon as possible.

80

Página 81

Item 4.

CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: DECEMBER 31, 2025

APPLICATION: R.E. PIERSON REGIONAL HEADQUARTERS (OFFICE, GARAGE AND CONTRACTORS YARD) @ 30 LAFFERTY LANE FILE #: S-26-02 REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services CONTACT PHONE #: 302-736-7025 CONTACT EMAIL: jlyon@dover.de.us

T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .

T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :

CITY AND STATE CODE REQUIREMENTS

SANITATION

  • 1.Every commercial customer shall provide such premises with a sufficient number of solid waste containers to provide adequate capacity for the solid waste placed out for collection without overloading the capacity of the containers. The City of Dover shall provide commercial customers with a maximum of two (2), 90-gallon trash containers and two (2), 90-gallong recycling containers.
  • 2.Trash collection site shall be oriented for side-loading pick-up if customer is utilizing City of Dover sanitation services.
  • 3.Any commercial customer requiring more containers, or larger containers, than provided above, must utilize private service. STORMWATER
  • 1.Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from Kent Conservation District is submitted to our office.
  • 2.The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert elevations must be labeled on all stormwater structures. STREETS
  • 1.Final site plan approval will not be granted until a letter of no objection, signed by DelDOT is submitted to our office.
  • 2.The current City of Dover standard street section provides for a 3’ grass strip between the curb and sidewalk. This standard was administratively revised to meet ADA and FHA compliance with cross slope requirements and to prevent cars from scrapping at driveways. The revised standard utilizes a five feet (5’) wide public sidewalk with a five feet (5’) wide grass strip behind the curb. Sidewalk and curb shall be installed for the width of the project scope.
  • 3.Please add the following notes to the plans:
  • a.Standard City of Dover sidewalk, as per chapter 98, article IV of the Dover Code of Ordinances, shall be required to be installed along the entire public street frontage of a property. Where frontage sidewalk exists but does not meet the standards of chapter 98, article IV, the sidewalk shall be re-laid to meet the standards. Sidewalk shall include barrier-free 81

Página 82

Item 4. R.E. Pierson Regional Headquarters (Office, Garage and Contractors Yard) @ 30 Lafferty Lane File #: S-26-02 December 31, 2025

access ramping at points of intersection with street crossings and at other locations so as to afford reasonable barrier-free pedestrian movement and site access. b. In accordance to Appendix A, Article VI, Section B.3, all sidewalks shall ascend from the curbstone to the building line at the ratio of one-quarter of an inch to the foot. Nothing in this section shall be construed to affect any pavement previously laid by order of the city council, until it is taken up and relaid.

WATER

  • 1.All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information.
  • 2.The following notes must be added to the plans:
  • a.Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project.
  • b.Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
  • c.The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736- 7025 prior to the start of construction. A representative from the City of Dover Department of Water & Wastewater must observe and approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted in the field due to conditions of the existing main. Possible conditions that would require tapping relocation include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be held responsible for field conditions requiring adjustment of the tapping location or for any work required by the contractor to make an appropriate and lawful connection.
  • 3.The size, type, and location of all proposed and existing water lines and valves must be shown on the plan. Please be advised that effective May 1, 2022, water mains can now be constructed using DR 18 PVC.
  • 4.Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine the size of the domestic and irrigation (if applicable) water meter for the proposed buildings. These projections must be submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meters must be installed in a pit per City of Dover requirements and manufacturer’s recommendations. The meter pit shall be installed in a non-traffic (including pedestrian) bearing location. Also, a dual check valve is required downstream of the meter.
  • 5.The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically, this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap and valve are located within five feet (5’) to ten feet (10’) of the building. A blow up detail of this layout is recommended.
  • 6.Provide a construction detail for the proposed restraining system for the fire main located within the buildings. There shall only be one (1) water service per building. The Department of Water & Wastewater will test and inspect all fire mains to a blind flange located inside the buildings. The blind flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the floor to the ninety degree (90°) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through walls and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with mechanical designer.
  • 7.Water services shall be either type K copper or SDR-9. 1. All non-metallic water lines (mains and services) shall be installed with a tracer wire and identification tape. The wire shall be a minimum of twelve (12) gauge blue coated solid copper wire, wrapped around the pipe, and extending up into all valve and curb boxes. The identification tape shall be six-inches (6”) wide, laid one foot (1’) above the pipe, with the following text: “Caution: Buried Water Line Below”. 3M marker balls, model 1423-XR, or approved equal shall be installed at every service line connection to the water main and all bends on the service line. 82

Página 83

Item 4. R.E. Pierson Regional Headquarters (Office, Garage and Contractors Yard) @ 30 Lafferty Lane File #: S-26-02 December 31, 2025

  • 8.On October 24, 2022, City of Dover Council approved the new Cross Connection Control Program. This program requires certain backflow prevention assemblies on water service connections to the city’s distribution system. Please provide a specific description of the activities in this building.

WASTEWATER

  • 1.All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information.
  • 2.The following notes must be added to the plans:
  • a.Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
  • b.Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff, subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as “…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no illegal discharges to the sanitary sewer system are created with the site improvements.
  • 3.The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines. Rim and invert elevations must be labeled on all sanitary structures. The minimum difference between a cleanout rim and invert shall be three- feet (3’).
  • 4.Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty cast iron frame and cover to prevent damage to the cleanout and lateral.
  • 5.Sizing (flow) calculations must be submitted for all sanitary sewer mains showing that velocity and all other requirements are met.
  • 6.The minimum size of all sanitary sewer laterals shall be six-inch (6”).
  • 7.If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County ordinance requirements, must be provided. A construction detail for the proposed grease trap, as well as the proposed location, must be provided on the plan.
  • 8.Depending on the effluent flow, the downstream pump station may be required to be evaluated by the developer / engineer to verify it can handle the additional effluent flow.

GENERAL

  • 1.All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must be included as a note on the plan.
  • 2.No trees may be planted within ten feet (10’) of utility infrastructure.
  • 3.No structure may be installed within ten feet (10’) of utility infrastructure, please depict all underground utilities and structures on the utility plan sheet to confirm compliance.
  • 4.The final site plan must be submitted in the following compatible digital formats:
  • a.AutoCAD 2018 (.dwg format).
  • b.Adobe Reader (.pdf format).

RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES 83

Página 84

Item 4. R.E. Pierson Regional Headquarters (Office, Garage and Contractors Yard) @ 30 Lafferty Lane File #: S-26-02 December 31, 2025

SANITATION / STORMWATER / STREETS / WATER / WASTEWATER / GENERAL 1. None.

ADVISORY COMMENTS TO THE APPLICANT

WATER

  • 1.The City of Dover water system is available to this site. The developer is responsible for all costs associated with extending and providing service to the proposed development.
  • 2.Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking Water for review and approval. The owner/developer will be responsible for providing all completed forms and plan sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the Office of Drinking Water until review has been completed by our office.
  • 3.Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water & Wastewater directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the site.
  • 4.Water impact fees will be required to be paid prior to Certificate of Occupancy for this project. WASTEWATER
  • 1.The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated with extending and providing service and capacity to the proposed development.
  • 2.Prior to plan approval, it may be required to submit the sanitary sewer system plans to the DNREC, Division of Water Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible for providing all application fees, completed forms and plan sets directly to DNREC.
  • 3.Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer and storm sewer crossings must be shown on the profiles.
  • 4.Wastewater impact fees will be required to be paid prior to Certificate of Occupancy for this project. GENERAL
  • 1.The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned, flowable fill may be required.
  • 2.Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team- logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88. SANITATION / STORMWATER / STREETS
  • 1.None.

I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .

84

Página 85

C F
S-26-02
Item 4.
I I
T R
CITY OF DOVER Y E

DEVELOPMENT ADVISORY COMMITTEE O M

F A APPLICATION REVIEW COMMENTARY R D.A.C. MEETING DATE: December 31, 2025 D S O H V A E L R APPLICATION: R.E. Pierson Regional Headquarters

FILE #: S-26-02 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal

CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457 josika@dover.de.us

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.

THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE APPLICANT:

CITY AND STATE CODE REQUIREMENTS:

  • 1.Proposed occupancy classification is office/business and possibly storage.
  • 2.Building Access shall be no further than 50 feet from a primary entrance.

Where buildings are provided with an automatic sprinkler system installed in accordance with NFPA 13, access shall be no further than 100 feet from the primary entrance. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)

  • 3.Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times the width of the door(s) or for 10 feet, whichever is greater. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
  • 4.Perimeter access shall be 30% for the office/business and 50% for the storage and clearly shown on the plans.

Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings of two or more stories, measured from the face of the building at grade with a maximum slope of ten percent (10%). Plantings and utility services (includes condenser units, transformers, etc.) shall be permitted within the perimeter access, and shall not interfere with emergency services fire ground operations.

If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building perimeter shall not be included in the calculation of Percent of Perimeter Access. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)

85

Página 86

Item 4.

Where parking is located between the building and perimeter access area, parking shall not be located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of two or more stories.

  • 5.All access roadways shall be paved and be a minimum of 20 feet clear width for two-way traffic and 14 feet clear width for one-way traffic. The paved width of access roadway shall be measured from edge of parking spaces, or face of curb for vertical curb and back of curb for mountable curb, or edge of pavement if there is no curbing.(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 5.2)
  • 6.Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in reference to this process.
  • 7.Gated Areas: Fire Department access shall be provided to the property through the use of a system or device approved by the Fire Marshal. The system or device required shall be located in an area accessible to the fire department and approved by the Fire Marshal. All gates shall be either automatic or manual.

An automated system shall consist of one manual and one automated means to open the gate. The owner or their representative shall meet with the Fire Marshal prior to submission to agree on the system. A letter of agreement shall be created and signed by both parties. The letter shall include a detailed description of both the manual and automated means.

A manual gate shall consist of one manual means to open the gate. The owner or their representative shall meet with the Fire Marshal prior to submission to agree on the means to open. A letter of agreement shall be created and signed by both parties. The letter shall include a detailed description of the manual means to open. To be considered accessible for fire department apparatus the actual clear openings shall be not less than 14 feet, the paved surface through the gate shall be not less than 12 feet, and the gate shall be setback from the perpendicular street by at least 50 feet. Please contact this office to discuss options available to comply with this requirement. (2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.6)

  • 8.Fire hydrants shall be installed per the requirements of City of Dover Public Utilities Water/Wastewater Handbook, NFPA requirements, and Delaware State Fire Prevention Regulations. City Ordinance Sec 46-9 (f). 5.1.1 Hydrant spacing as shown in the Fire Flow Tables shall be used as a general rule. Hydrants shall be located at the direction of the State Fire Marshal so as to minimize friction in fire hose. All hydrant spacing shall be located along available roads or at the direction of the State Fire Marshal. This measurement shall be calculated by way of accessible thoroughfare(s) from the building to be protected to the hydrant and may not necessarily be a radius. 5.1.3 Additional hydrants shall be provided when the State Fire Marshal deems it necessary based on the configuration of the site, building(s), exposures, construction, occupancy, and/or specific hazard(s). Fire Flow table 2, hydrant spacing shall be 800 feet on center for one and two family detached dwellings, other residential, rowhouses and townhouses, assembly, health care, business, education, storage, industrial, mercantile, and mini storage. (702, Chapter 6)

NFPA 1

18.5.2 detached one- and two-family dwellings, fire hydrants shall be provided for detached one- and two-family dwellings in accordance with both of the following: 1. the maximum distance to a 86

Página 87

Item 4.

fire hydrant from the closest point on the building shall not exceed 600 feet 2. the maximum distance between fire hydrants shall not exceed 800 feet.

18.5.3 buildings other than detached one- and two-family dwellings, fire hydrants shall be provided for buildings other than detached one- and two-family dwellings in accordance with both of the following 1. The maximum distance to a fire hydrant from the closet point on the building shall not exceed 400 feet 2. The maximum distance between fire hydrants shall not exceed 500 feet

  • 9.All fire hydrants shall be marked as prescribed within the appropriate section of this regulation and as illustrated by the appropriate figures of this regulation.

All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define specific areas, where fire hydrants are located along a curb line with permitted parking, the area between the fire hydrant and the street or fire lane shall be stenciled with four inch (4") demarcation lines and the words "NO PARKING", demarcation lines shall be measured from the center line of the fire hydrant and extend for a distance 15 feet on both sides.

Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked vehicles they shall be treated as follows: fire hydrants shall be protected in all directions for a distance of seven feet (7') with barriers or curbing, Minimum four-inch (4") diameter steel bollards filled with concrete and marked yellow shall be installed at the outermost corners of the fire hydrant demarcation area. The minimum height of the bollard shall be 36 inches above the finished grade of the adjacent surface, and the steamer connection of all fire hydrants shall be positioned so as to be facing the edge of the street, or traffic lane. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2) The owner is responsible if the hydrant is private.

  • 10.Hydrant barrels shall be provided with reflective material, such as paint, durable for highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel under the top flange, hydrant bonnets shall be color coded based on the following criteria: class AA 1500 GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 - 999 GPM - painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM - painted black. (2021 Delaware State Fire Prevention Regulations 703, Chapter 3. 4) The owner is responsible if the hydrant is private.
  • 11.Hydrants are to be Darling Co. B-62-B Breakaway https://american-usa.com/products/valves-and- hydrants/fire-hydrants/5-1-4-american-darling-b-62-b-5
  • 12.NFPA 72 compliant Fire Alarm System TBD per occupancy code requirements.

Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an occupancy determined to be a place of assembly by the fire marshal and is capable of receiving an occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with NFPA codes governing the installation of fire alarms and the National Electrical Code.

Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined to be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50 percent of the assessed value of the building and is capable of receiving an occupant load 75 persons or greater or is being enlarged to receive an occupant load of 75 persons or greater, shall be required to install a complete fire alarm system in accordance with NFPA codes governing the installation of fire alarms and the National Electrical Code. 87

Página 88

Item 4.

Public mode audible requirements. To ensure that audible public mode signals are clearly heard by occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average ambient sound level or five decibels (dB) above the maximum sound level having a duration of at least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area required to be served by the system using the A-weighted scale dBA. In the event the stated requirement cannot be met a shunt trip relay/switches shall be the approved method of meeting the intent of this section of the Code. (City Code of Ordinances 46-171)

  • 13.Sprinkler system TBD. System is to be monitored by an approved Fire Alarm System.

This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions which are modified by more than 50% after the effective date of these Regulations. The 50% figure shall be calculated utilizing the gross square footage of the building, structure, marine vessel, premises and conditions as to arrive at the correct application.

Any proposal that is presented to the Office of the State Fire Marshal for review and approval for a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross square footage of a non-sprinklered building, may not have another such project for the same building submitted for review and approval any sooner than three (3) years after the date of the final inspection unless sprinkler projection is provided throughout the entire building.

In all buildings exceeding 10,000 square feet of aggregate, gross floor area.

In all buildings in excess of 40 feet in height or more than four (4) stories in height.

In all buildings or areas thereof used for the storage, fabricating, assembling, manufacturing, processing, display or sale of combustible goods, wares, merchandise, products, or materials when more than two (2) stories or 25 feet in height.

In all basement areas exceeding 2,500 square feet floor area.

In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and exceeding two (2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or

Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment buildings storage areas except individual unit closets that are located within individual residential living units.

In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA 101, as adopted and/or modified by these Regulations. In all buildings or areas classified as "high hazard" under the Life Safety Code, NFPA 101, or "extra hazard" under the Standard for the Installation of Sprinkler Systems, NFPA 13, as adopted and/or modified by these Regulations.

All buildings used as dormitories, in whole or in part, to house students at a public or private school or public or private institution of higher education. (16 Del.C. Ch. 88) This applies to all such dormitories regardless if new or existing. 88

Página 89

Item 4.

(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)

Places of assembly shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13 when the following apply:

All new indoor places of assembly with an occupant load of 150 persons or greater.

Any interior renovations of 50 percent or more to an existing place of assembly with an occupant load greater than 150 persons.

Any additions or increase in interior size to an existing place of assembly that would create an occupant load of 150 persons or greater.

Places of assembly where alcohol is served for consumption on the premises shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13 when the following apply:

All new indoor places of assembly with an occupant load of 100 persons or greater and where alcohol will be served for consumption on the premises.

Any interior renovation of 50 percent or more to an existing place of assembly with an occupant load greater than 100 persons and where alcohol will be served for consumption on the premises.

Any additions or increase in interior size to an existing place of assembly which would create an occupant load of 100 persons or greater and where alcohol will be served for consumption on the premises.

New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13. (City of Dover Code of Ordinances 46-162)

NFPA 101, 12.3.5.1 The following assembly occupancies shall be protected throughout by an approved, supervised automatic sprinkler system in accordance with 9.7.1.1(1): 1. Dance Halls 2. Discotheques 3. Nightclubs 4. Bars 5. Restaurants 6. Assembly occupancies with festival seating

  • 14.Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow located within 50 feet of main entrance. Access to the Fire Department Connection must be clear unobstructed access as defined by the AHJ.

Fire department connections. Unless otherwise approved by the fire marshal, fire department connections shall be on the street side of the building and shall be located and arranged so that hose lines can be readily and conveniently attached to without interference from any nearby obstructions as defined by the fire marshal's office. Fire department connections shall be a five- inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover 89

Página 90

Item 4.

Fire Hydrant and within 50 feet of the main entrance of the structure it serves. All fire department connections shall be not less than three feet nor more than five feet in height above finished grade. The fire marshal shall have the authority to require more stringent requirements when deemed necessary. (City of Dover Code of Ordinances 46-162)

  • 15.Parking and/or obstructions shall be prohibited in front of fire department connections for a distance measuring from the center line and extending four feet on both sides. (2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
  • 16.Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose would come off the fire equipment.
  • 17.If there is any type of rack storage, the following will be required: 1) a diagram showing the layout and type of rack system 2) a list and quantity of items being stored 3) a letter from an authorized/licensed fire suppression contractor stating that in rack sprinklers are or are not needed. If in rack sprinklers are not needed, a letter may be requested from an authorized/licensed fire suppression contractor to ensure that the sprinkler system is adequate for the storage presented.
  • 18.All standpipe and sprinkler connections shall be marked as prescribed within the appropriate section of this regulation and as illustrated by the appropriate figures of this regulation. All standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow demarcation lines to define specific areas, Solid yellow demarcation lines shall be measured from the center line of the connection and extend for a distance of four feet (4') on both sides, and where parking is allow between the building and the street or fire lane the solid yellow demarcation lines shall extend from the end of the sidewalk surface to the street or fire lane (Markings shall not be required on the sidewalk surface).

All fire department connections (standpipe and sprinkler) shall have a minimum 12" x 18" sign that reads FIRE DEPT. CONNECTION, sign lettering shall be a minimum of 3 inches (3") in height with red scotchlite letters on white scotchlite background. The sign shall be clearly visible from the fire lane or roadway, and signs using NFPA international symbols shall be an acceptable alternative. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)

  • 19.The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be protected from impact damage by impact protection. Natural gas and LP gas meters, regulators, and valves located inside structures shall have impact protection, except when located in separate protected utility rooms.

Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48 inches (four ft.) in height above the finish grade elevation. Any deviation of the stated requirements must be approved by the fire marshal and/or chief building inspector. The above dimensions shall serve as the requirement for installation; however, the fire marshal and/or chief building inspector shall have the authority to require more stringent dimensions to fit the needs of devices warranting impact protection.

Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors shall be of fluorescent or have a reflective coating. Any deviation of the stated requirements must be approved by the fire marshal and/chief building inspector. (City of Dover Code of Ordinances, 46-4)

90

Página 91

Item 4.

  • 20.Every house, building or structure used or intended for use as living quarters or as a place for conducting business, and having any wall facing or abutting any public or private street or alley, shall have displayed on that wall, in legible, easily read characters which are of contrasting color to the background, the proper street number for such house, building, or structure in accordance with the following:

One-family and two-family residential structures, height, the number shall measure a minimum of four inches in height, location, the number shall be placed on the house above or to the left or right of the front entrance, color, the number shall be contrasting to the background color, Arabic numerals, all numbers shall be Arabic numerals.

Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when identifying individual apartments with exterior doors, and 12 inches when identifying buildings with apartment complexes where there are two or more buildings not assigned street addresses. Individual buildings with street addresses shall have numbers measuring six inches, location, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot, color, numbers shall be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic numerals.

Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in height, location generally, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot,

property line or driveway, should the building be located far enough from a public or private road so that the numbers are not clearly visible from the street, then the street address shall also be posted on the property at or near the property line or driveway to said building,

color; each building, numbers shall be contrasting to the background color and shall be placed on each building in the complex,

Arabic numerals, all numbers used shall be Arabic numerals,

Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number affixed to the front of the tenant space and on the outside of the rear door which corresponds with that tenant space. Numbers shall measure six inches in height. (City of Dover Code of Ordinances, 98-344)

  • 21.TBD, A lock box (Knox) containing any and all means necessary for fire department access shall be provided at the following occupancies: any occupancy that contains a fire alarm signaling system that is monitored off-site, or any occupancy that contains an automatic sprinkler system. (2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)

Secured key systems. When required; exemption. A secured key system shall be required for any new or existing building where a fire alarm or sprinkler system is being installed. It shall be the responsibility of the owner or occupant to keep a set of keys in the secured key box that are current to the locks of the protected occupancy. Buildings with 24-hour staffing or guard service shall be exempt from this subsection. 91

Página 92

Item 4.

Location. The secured key system shall be located as close to the main entrance as possible. Should the building design not allow the secured key system to be located by the main entrance, the fire marshal and fire chief shall come to an agreement as to an alternate location for the key box. A secured key system, once installed, shall not be obstructed from view or obstructed by any means that would delay the fire department access to the box.

Required keys. Keys to be secured in the key box shall include keys to all points of ingress or egress, whether on the interior or exterior of the building, and keys to locked mechanical rooms, electrical rooms, elevator rooms, fire alarm and sprinkler controls and any area protected by automatic fire detection. Keys to individual residential apartment units are not required.

Ordering responsibility. It shall be the responsibility of the general contractor to order the key box for new buildings. It shall be the responsibility of the owner or tenant to order the key box for existing buildings.

Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted before the installation of a key box. (City Code of Ordinances 46-127)

Knox Box to be mounted 6 feet above ground level

  • 22.All required means of egress shall have an exit discharge consisting of a non-slip surface and leading to and terminating at a public way. NFPA 101
  • 23.Project to be completed per approved Site Plan.
  • 24.Full building and fire plan review is required.
  • 25.Separate building permits/plans submission will be required for each building and/or tenant fit out. If the permit submission is for a “shell” a Certificate of Occupancy will not be issued. Separate plans and permits submissions will be required for each “tenant fit out” at which time a Certificate of Occupancy will be issued upon compliance/completion of each “tenant fit out”.

Each “shell” will require a fire permit for sprinkler and fire alarm if applicable. Those systems (for the “shell”) must be accepted into service prior to any “tenant fit out” fire permits being issued.

  • 26.Construction or renovations cannot be started until building plans are approved.
  • 27.Fire alarm systems, fire suppression systems, hoods, exhaust ducts, and hood suppression systems require a fire permit from the Fire Marshal’s Office. This work cannot be started until the permit is approved.
  • 28.Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
  • 29.The following is City Ordinance, Appendix B-Zoning, Article 8 Enforcement and Penalties:

92

Página 93

Item 4.

Section 1. - Building permits.

No building or structure in any district shall be erected or structurally altered without a building permit duly issued upon application to the building inspector. No building permit shall be issued unless the proposed construction or use is in full conformity with all the provisions of this ordinance. Any building permit issued in violation of the provisions of this ordinance shall be null and void and of no effect, without the necessity for any proceedings for revocations or nullification thereof, and any work undertaken or use established pursuant to any such permit shall be unlawful (see section 4 for penalties).

1.1 No building permit shall be issued for the construction or alteration of any building upon a lot without frontage upon, or legal permanent access to, a public street improved to the satisfaction of the planning commission, or without access to a public sewer.

1.2 No building permit shall be issued for any building where the site development plan of such building is subject to approval by the planning commission, except upon approval of such plans approved by the said commission.

1.21 No building permit shall be issued for any building in a subdivision unless the subdivision plot has been approved by the planning commission.

1.3 No building permit shall be issued for a building to be used for any conditional use in any zone where such use is allowed only with approval of the planning commission, unless and until such approval has been duly granted by the said commission.

(Ord. of 7-12-1993, § 3)

ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:

  • 1.What is the proposed garage being used for?
  • 2.See item # 7 listed above in reference to gated areas.
  • 3.Need to discuss adding 1-2 fire hydrants

APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):

2024 NFPA 1 Fire Code (NFPA; National Fire Protection Association) 2024 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association) 2025 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association) 2025 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association) 2009 IBC (International Building Code) Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations 2021 Delaware State Fire Prevention Regulations City of Dover Code of Ordinances

*If you have any questions or need to discuss any of the above comments, please call the above contact person listed.

93

Página 94

Item 4.

From: Akbar, Ali (DelDOT)
To: Melson-Williams, Dawn; Purnell, Maretta
Cc: Mobley, Will (DelDOT)
Subject: EXTERNAL: DAC Plan Comments
Date: Friday, January 2, 2026 10:20:10 AM

Some people who received this message don't often get email from ali.akbar@delaware.gov. Learn why this is important

WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning,

Here are the comments from DelDOT for the applications discussed in the DAC Committee Meeting.

S-26-01 Bayhealth Medical Center, Inc. - Kent Campus: Master Plan Phases 1-3 Comments: Schedule a pre-submittal meeting with DelDOT

S-26-02 R.E. Pierson Regional Headquarters (Office, Garage and Contractors yard) at 30 Lafferty Lane Comments: Schedule a pre-submittal meeting with DelDOT NOTE: Project appears to have an entrance within the area of a Right Turn Lane on Eastbound Lafferty Lane to Cassidy Drive. Ensure entrance is NOT within the operational area of the RTL.

S-26-03 The Enclave Apartments: Revised Walker Road Apartments Comments: Schedule a pre-submittal meeting with DelDOT

S-26-04 DuPont Plaza at 747 N. DuPont Highway: Revised Master Plan Comments: Schedule a pre-submittal meeting with DelDOT

Please let me know if you have any questions.

Ali Akbar
Engineer I
DelDOT, Development Coordination
800 Bay Road
Dover, DE 19901
302-760-2910

94

Página 95

KENT CONSERVATION DISTRICT

Item 4.

1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG

CITY OF DOVER ADMINISTRATIVE SITE PLAN REVIEW JANUARY 2026

APPLICATION: R.E. Pierson Regional Headquarters (Office, Garage, & Contractors Yard) at 30 Lafferty Lane FILE #: S-26-02 REVIEWING AGENCY: Kent Conservation District CONTACT PERSON: Cullen Baker PHONE: (302) 608 - 5370 EMAIL: stormwater@kentcd.org

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:

Source: 2019 Delaware Sediment and Stormwater Regulations

CITY AND STATE CODE REQUIREMENTS:

  • 1.As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management plan must be reviewed and approved by the District prior to any land disturbing activity (i.e. clearing, grubbing, filling, grading, etc.) taking place. The review fee and a completed application is due at the time of plan submittal to the District’s office.
  • 2.The following notes must appear on the record plan:
  • a.The Kent Conservation District reserves the right to enter private property for purposes of periodic site inspection.
  • b.The Kent Conservation District reserves the right to add, modify, or delete any erosion or sediment control measure, as it deems necessary.
  • c.A clear statement of defined maintenance responsibility for stormwater management facilities must be provided on the Record Plan. ADVISORY COMMENTS TO THE APPLICANT:
  • 1.A pre-application meeting will need to be held with KCD prior to submitting plans for review.
  • 2.Due to the site being within close proximity to a ground water management zone, the stormwater facility will need to be a dry or infiltrating basin. A wet facility where groundwater is intercepted cannot be used.
  • 3.Please note the Kent Conservation District will not review an application more than three times. If after the third review the plan is still not found to be approvable, the application will be denied, and a new application with review fees are to be re-submitted to continue a detailed plan review.
  • 4.A letter of no objection to recordation will be provided upon approval of the Sediment and Stormwater Management Plan.

95

Página 96

Item 4.

CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
ADVISORY BRIEF Planning
D.A.C. MEETING DATE: 1/7/2026 Organization

S-26-02 R.E. Pierson Regional Headquarters (Office, Garage and Contractors yard) at 30 Lafferty Lane

FILE # S-26-02 REVIEWING AGENCY: Dover/Kent County MPO

CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030

Attached, please find comments submitted by Dover Kent MPO for each of the current City of Dover Development Advisory Committee (DAC) applications. These comments are a part of the MPO’s ongoing goals of promoting transportation safety and connectivity within the region. They are submitted in accordance with the support given by the MPO Council on November 6, 2024.

Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be waived.

City of Dover Planning Commission
Site Development Plan Review

S-26-02 R.E. Pierson Regional Headquarters (Office, Garage and Contractors yard) at 30 Lafferty Lane

First, Dover Kent MPO would like to point out the need for adequate pedestrian facilities in this area. Lafferty Lane is a Minor Collector with an Annual Average Daily Traffic (AADT) of 1,969 and a posted speed limit of 40 mph. Shoulders are present on Lafferty Lane but it is generally not safe for pedestrian use, given the posted speed limit and the curve in the roadway. Although there are limited existing sidewalks at this time, it is possible to connect with the sidewalks in front of Cassidy Commons. While adding sidewalks to the entire frontage of the property would have the best outcome towards safety and connectivity, if this is not done right away, the applicant should be prepared to add the remaining sidewalks when additional segments of the property are developed.

Other pedestrian and bicycle improvements are already present in the site plan. These include internal sidewalks with ADA ramps, crosswalks, bicycle racks, and accessible parking spaces close to the main building. These features will all help improve the experience for visitors to the

96

Página 97

Item 4.

property. One place that could also use a crosswalk is at the entrance to the parking area, where the two ADA ramps are located. This would allow for safer movements between Lafferty Lane and the main building.

The planned entrance to the property should not conflict with the righthand turn lane connecting to Cassidy Drive. Note that it might be necessary to add a similar righthand turn lane at the entrance to the property. This would reduce the likelihood of a crash as vehicles turn off of Lafferty Lane. The applicant should work with DelDOT in order to address this need.

Finally, for site plans that involve freight trucks and other large vehicle types, Dover Kent MPO typically recommends adding truck parking and staging to the plan. Doing so will reduce the need for vehicles to park in the road’s shoulder or in “undesignated” parking locations. Although this particular property might not be used primarily for freight purposes, it would still be beneficial to designate additional space for large vehicles to use when the garage is at capacity. This could be as simple as using paint to indicate these locations within the paved area of the property. For more information on the City of Dover’s goals for truck parking, please refer to the Dover Freight Plan.1

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.

1 Dover Freight Plan. Dover/Kent County MPO (2025). https://doverkentmpo.delaware.gov/files/2025/04/2025- 04_Dover-Freight-Plan_FINAL.pdf.

97

Página 98

Item 4.

WAIVER REQUEST
R.E. PIERSON REGIONAL HQ
SITE PLAN
CURBING REQUIREMENTS
PLANNING OUR
CLIENTS’ SUCCESS

REQUEST: We request that the required upright concrete
curbing along the drive to the rear building
and storage area be waived to allow for sheet
flow off the pavement for stormwater
management purposes.

EXTENT OF THE REQUEST: Article 6, section 3.6 (b) state “All permanent parking areas shall be enclosed with upright concrete curbing at least six inches in height.” We are requesting a waiver to eliminate perimeter upright curbing along the drive to the garage and paved storage area (once past the intersection with the parking area drive) to allow for sheet flow to runoff into the perimeter drainage system (swales). Perimeter curb will be installed along the entrance and into the surface parking area in front of the office building.

BASIS FOR REQUEST: Article 6, section 3.6 (b) of the City of Dover zoning standards states “The city planner may BECKER MORGAN GROUP, INC. relax this requirement for a portion of a parking area when there is a demonstrated need to A RCHITECTURE & E NGINEERING convey stormwater to a proposed or approved 309 SOUTH GOVERNORS AVENUE stormwater management area.” DOVER, DELAWARE 19904 302.734.7950 We intend to sheet flow drainage off of the FAX 302.734.7965 pavement areas into the swales and the pond RITTENHOUSE STATION and thus curbing is not required to direct 250 SOUTH MAIN STREET, SUITE 109 drainage to inlets. NEWARK, DELAWARE 19711 302.369.3700

PORT EXCHANGE

312 WEST MAIN STREET, SUITE 300 202530200ae-curb-waiver.doc
SALISBURY, MARYLAND 21801
410.546.9100
FAX 410.546.5824

A RCHITECTURE & PLANNING

3205 RANDALL PARKWAY, SUITE 211
WILMINGTON, NORTH CAROLINA 28403
910.341.7600
FAX 910.341.7506

www.beckermorgan.com
98

Página 99

Item 4.

WAIVER REQUEST

R.E. PIERSON REGIONAL HQ

SITE PLAN

SIDEWALK REQUIREMENTS

PLANNING OUR

CLIENTS’ SUCCESS

REQUEST: Elimination of sidewalk installation requirements along the portion of the property to the west of the project site due to the nature/size of the parcel, the project location on the property itself and the use of the site as a contractor Headquarters with equipment/materials storage.

EXTENT OF THE REQUEST: Article 5, Section 18.2, Sidewalks or other pathways according to the requirements of this section shall be installed on a property by the property owner or developer under the following circumstances: a) When the property is part of a development proposal which is subject to planning commission site development plan review. We would like to eliminate the requirement for the portion of the sidewalk along the frontage of Lafferty Lane to the west of the project area. Frontage sidewalk would be installed along the frontage of the proposed project area.

BASIS FOR REQUEST: Article 5, Section 18.5, states “The property owner or developer may request a waiver from the BECKER MORGAN GROUP, INC. planning commission or city planner, according to A RCHITECTURE & E NGINEERING the type of plan review required by Appendix B— Zoning, Article 10—Planning Commission, under 309 SOUTH GOVERNORS AVENUE DOVER, DELAWARE 19904 the following circumstances in order to reduce or 302.734.7950 eliminate the requirements for pathway FAX 302.734.7965 installation: RITTENHOUSE STATION a) When the property is isolated from the 250 SOUTH MAIN STREET, SUITE 109 NEWARK, DELAWARE 19711 existing pathway network, with no existing 302.369.3700 pathways within the immediate vicinity of the property. PORT EXCHANGE 312 WEST MAIN STREET, SUITE 300 This project proposes to develop 5.28 Acres of SALISBURY, MARYLAND 21801 the 29.614 acre parcel with the proposed project 410.546.9100 FAX 410.546.5824 area located at the east side of the property. The remainder of the parcel is intended to be left for A RCHITECTURE & PLANNING future development. Additionally, no sidewalks 3205 RANDALL PARKWAY, SUITE 211 exist along the south side of Lafferty Lane from WILMINGTON, NORTH CAROLINA 28403 the Bay Road intersection to this property’s 910.341.7600 FAX 910.341.7506 eastern boundary line. Thus, we request that the remainder of the frontage sidewalk be www.beckermorgan.com 99

Página 100

Item 4.
December 4, 2025

constructed when the remainder of the property is developed in the future.

  • b)When the proposed use would not generate or attract additional pedestrian, bicycle, or other non- motorized trips. The proposed use of the site is a contractors headquarters office and equipment/materials storage areas for conducting construction services. Contractor offices/yards do not generate pedestrian traffic as there is no sales or services provided to the general public at the project site.
  • c)When physical characteristics of the property are such that pathway installation is impractical or impossible. N/A for this project

202530200af-sidewalk waiver.doc

100

Página 101

Item 4.

December 17, 2025

Mrs. Dawn Melson-Williams, AICP
City of Dover
Department of Planning and Inspections
P.O. Box 475
Dover, DE 19903-0475

RE: Performance Standard Review Application
R.E. PIERSON REGIONAL HQ
Dover, Delaware
2025302.00

Dear Mrs. Melson-Williams:

On behalf of our client, R.E. Pierson Construction Company, we are hereby submitting a Performance Standard Review Application as a supplement to the Application for Site Development Plan Approval for the above-referenced project. This is submitted for consideration at the January 20, 2026 Planning Commission meeting. This project proposes the construction of a 9,900 s.f. contractors office building and a 9,600 s.f. maintenance garage/storage building with associated parking, fenced storage area and other site amenities. The building is not intended for any type of manufacturing processes and thus the majority of the following standards are not applicable. Per your request, responses to the Performance Standards for the structure is provided below.

Buildings

Section 8.51 - Fire and Explosion hazards: The proposed buildings are under the threshold to require fire sprinklers and thus will not be sprinklered in accordance with the Delaware State Fire Prevention Regulations. The buildings will not contain any hazardous or explosive materials nor will there be any fuel storage on the site.

Section 8.52 - Radioactivity or Electromagnetic Disturbance: Not Applicable. The proposed buildings will not contain nor produce radioactivity or electromagnetic disturbance.

Section 8.53 - Noise: Not Applicable - The proposed buildings will not generate any noise beyond that which is consistent with a construction company office and maintenance garage.

Section 8.54 - Vibration: Not Applicable - The proposed buildings will not generate any vibrations.

Section 8.55 - Smoke: Not Applicable - The proposed buildings are not intended for manufacturing and will not generate smoke as part of their operation.

Section 8.56 – Odors: Not Applicable - The proposed buildings will not generate odorous gases or other offensive odorous matter.

Section 8.57 – Fly Ash, Dust, Fumes, Gases, and other forms of Air Pollution: Not Applicable - The proposed building will not generate any of the aforementioned forms of air pollution.

Section 8.58 - Glare: The proposed lighting for the building and parking areas will meet City of Dover lighting requirements. 101

Página 102

December 17, 2025
Item 4.
R.E. Pierson Regional HQ

Section 8.59 – Liquid or Solid Wastes: No liquid or solid wastes will be discharged to the public sewer other than normal sanitary sewage from restrooms within the building.

Section 8.60 – Traffic Congestion: The proposed site will take access from Lafferty Lane, which is a DelDOT maintained roadway. The total site trips for the project do not meet DelDOT’s threshold for a Traffic Impact Study. As the site is a construction contractor office and maintenance garage, the only trips to the site will be employee trips.

We believe this addresses the requirements for the Performance Standard Review Application. Please attach this application to our Application for Site Development Plan Approval scheduled for review by the Planning Commission and contact me with any questions.

Sincerely,

BECKER MORGAN GROUP, INC.

Michael J. Henry, LEED AP
Senior Associate

MJH/

Cc: Nick Hetrick – R.E. Pierson Construction Company

202530200ah-Perf-Rev-ltr.docx

102

Página 103

24x36 24x36

Item 4.

ND
24x36
LAFFERTY LANE EPO NE
24x36

RS LA

HO
VARYING WIDTH PUBLIC RIGHT OF WAY RT
Y
FFE
SCR 347, MINOR COLLECTOR LA
AD
FIRC
24x36 FIP RO 24x36

1
NE
WA LA
TY
24x36

RE
24x36

ER
RT FF
. LA
DE
24x36 FCM
222.76' N 59° 08' 10" E 649.41'
LA SITE
ARCH I T E C TURE 24x36

FIRCN 58° 13' 54" ESITE
ENG I NE E R I NG
40' B.R.L.10

FCM Delaware
24x36 24x36

Dover
9 302.734.7950
Newark
24x36

302.369.3700 24x36

Maryland

S 30° 51' 49" E
Salisbury
24x36

PROPOSED OFFICE

410.546.9100 24x36

9,900 S.F.
F.F. EL.: 22.50'
North Carolina
KENT COUNTY TAX ASSESSMENT MAP KENT COUNTY TAX ASSESSMENT MAP
RADIUS: 500.00' Charlotte
24x36

ARC LENGTH: 698.75' VICINITY MAP SCALE : 1" = 1,200' LOCATION MAP SCALE : 1" = 500' 980.270.9100 24x36

CHD. BRG: N 18° 25' 24" E Raleigh
CHD. LENGTH: 643.26' 919.243.1332
24x36
SITE DATA Wilmington 24x36

  • 1.OWNER OF RECORD: RICHARD E. PIERSON CONSTRUCTION CO. 910.341.7600 P.O. BOX 430 www.beckermorgan.com 20' B.R.L. WOODSTOWN, N.J. 08098 24x36

LANDS N/F (856) 769-8244 - EMAIL: NHETRICK@REPIERSON.COM

24x36

RICHARD E. PIERSON CONSTRUCTION CO. 2. ENGINEER / SURVEYOR: BECKER MORGAN GROUP INC. T.P.: 2-05-07700-01-2803-00001 309 SOUTH GOVERNORS AVE. PROPOSED GARAGE 24x36

EF
DEED REF.: 13381-273 9,900 S.F.
F.F. EL.: 22.50'
DOVER, DE. 19904 24x36

PB. REF.: 72-95 & 150-86 (302) 734-7950 - EMAIL: mhenry@beckermorgan.com - XR 3. PROPERTY MAP NUMBERS: 2-05-07700-01-2803-00001 EA 29.6135 ACRES ± 4. PROPERTY ADDRESS: 30 LAFFERTY LANE 24x36 PZ1 DOVER, DE. 19901 24x36

ON 5. PROPERTY LOCATION: LATITUDE: N 39° 08' 50.81" GRS80 - NAD83 (2011) YZ LONGITUDE: W 75° 29' 31.73" GRS80 - NAD83 (2011) FCM RLA 6. ZONING CLASSIFICATION: EXISTING: M - MANUFACTURING, AEOZ (APZ 1, 65 DNL A) 24x36 24x36

PROPOSED: M - MANUFACTURING, AEOZ (APZ 1, 65 DNL A)

VE
SO 7. DEED REFERENCE : DEED BOOK: 13381/273
FCM
8. PLAT REFERENCE : PLAT BOOK: 72/95 AND 150/86
VIR LANDS N/F
ON
24x36 24x36

DELMARVA LAND HOLDINGS, LLC9.PRESENT USE:VACANT
T.P.: 2-05-07700-01-2804-000PROPOSED USE:OFFICE, GARAGE, CONTRACTOR YARD
EN
DEED REF.: 10622-12310. PROPERTY AREAS:TOTAL: 29.6135 ACRES± (1,289,964 S.F.)
POZONING: MPROPOSED PROJECT AREA: 5.284 ACRES± (230,184 S.F.)
24x36
RT24x36

. AIR 11. IMPERVIOUS (LOT) COVERAGE: MAXIMUM ALLOWED: 85%

40' B.R
EXISTING: 0 S.F.
-A
PROPOSED: 72,341 S.F. = 5.61%
.L
ZO
24x36

NE 12. BULK STANDARDS: M - MANUFACTURING REQUIRED 24x36

LOT AREA (MIN.): 0.5 ACRES

NO
LOT WIDTH (MIN.): 100 FT.
PROJECT AREA IS
E LOT DEPTH (MIN.): 150 FT.
24x36 FRONT SETBACK: 40 FT. 24x36

5.284 AC± (230,184 S.F.) SIDE SETBACK: 20 FT.
.
REAR SETBACK: 20 FT.
SIDE/REAR ADJ RESIDENTIAL: 50 FT.
24x36
13. BUILDINGS: EXISTING: 9,900 S.F. (OFFICE) N 24x36

PROPOSED: 9,600 S.F. (GARAGE)

V
V 19,500 S.F. (TOTAL)
V HEIGHT: 17.5 FT.+/- 60 FT. (MAX.)
24x36
V STORIES: 1 NO LIMIT 24x36

FLOOR AREA RATIO: 0.015 0.5 (MAX.)

V V NFPA CONSTRUCTION TYPE: TYPE VB

V 14. UTILITIES: WATER: CITY OF DOVER

24x36 FIRC SEWER: CITY OF DOVER 24x36

V

VGAS:CHESAPEAKE UTILITIES
VELECTRIC:CITY OF DOVER
13' 04" W
V
S 48°
V
V15. PARKING CALCULATIONS :REQUIRED:9,900 S.F. / 800 S.F.= 12.4 OR 1/EMP (15) = 15
24x36

V V V V 24x36

VVPROVIDED:19PROJECT TITLE
VHANDICAPPED PARKING REQUIRED :1

639.99'

VHANDICAPPED PARKING PROVIDED :1 (VAN ACCESSIBLE)
BICYCLE PARKING REQUIRED :1
R.E. PIERSON
V

6' 44" W
24x36
V 24x36

VBICYCLE PARKING PROVIDED :2
V16. LOADING CALCULATIONS :LOADING BERTHS REQUIRED :1

24x36

N 21° 3 V V V V V 17. DUMPSTER CALCULATIONS : LOADING BERTHS PROVIDED : DUMPSTERS REQUIRED : 1 2 REGIONAL HQ 24x36

V DUMPSTERS PROVIDED : 2

V V V V 18. SIGNAGE : FUTURE PERMIT SUBMISSION 19. OUTDOOR LIGHTING : LIGHTING SHALL BE 1.5 FOOT CANDLES (MINIMUM) AT GRADE 24x36 V LANDS N/F V 24x36

VMATTHEW E. MITTEN20. SURVEY DATUM:NGS MONUMENT:
FIRC0'V
T.P.: 2-05-07700-01-2700-000
VVVERTICAL:NAVD 88 - CORS
1093.7DEED REF.: 8538-63HORIZONTAL:NAD 83 (2011) DSP - CORS
VV
24x36
ZONING: IPM21. MONUMENTATION:14 FOUND24x36

V V V 22. SOILS ON SITE: FgcA - FALLSINGTON LOAMS, 0 TO 2 PERCENT SLOPES, MID ATLANTIC COASTAL V V V PyA - PINEYNECK LOAM, 0 TO 2 PERCENT SLOPES V PyB - PINEYNECK LOAM, 2 TO 5 PERCENT SLOPES 24x36

GENERAL NOTES : V

V V V WocA - WOODSTOWN LOAM, 0 TO 2 PERCENT SLOPES, MID ATLANTIC COASTAL 24x36

V 23. WETLAND AREA: 1.06 ACRES

  • 1.THE BOUNDARY DATA SHOWN HEREON WAS COMPILED FROM A FIELD RUN SURVEY PERFORMED BY BECKER MORGAN 20. THE SITE CONTRACTOR SHALL NOTIFY THE CITY OF DOVER DEPARTMENT OF WATER AND WASTEWATER CONSTRUCTION
  • 24.ROAD CLASSIFICATION: LAFFERTY LANE - MINOR COLLECTOR - 40 MPH 30 LAFFERTY LANE GROUP, INC., DOVER, DE., IN OCTOBER 2025. V V MANAGER AT 302-736-7025 PRIOR TO THE START OF CONSTRUCTION. A REPRESENTATIVE FROM THE CITY OF DOVER 24x36

2. V THE BOUNDARY LINES PORTRAYED HEREON HAVE BEEN ESTABLISHED BASED SOLELY ON PHYSICAL EVIDENCE DISCOVERED DEPARTMENT OF WATER AND WASTEWATER MUST OBSERVE ALL CITY OWNED WATER AND SANITARY SEWER V CITY OF DOVER 24x36

V INTERCONNECTIONS AND TESTING. ALL WATER TAPS MUST BE PERFORMED BY A CITY OF DOVER APPROVED CONTRACTOR. V IN THE FIELD IN CONJUNCTION WITH DETERMINATIONS DERIVED FROM SOURCE OFTITLE AND ADJACENT DEED V V THE PROPOSED LOCATION FOR THE WATER TAP MAY NEED TO BE ADJUSTED IN THE FIELD DUE TO CONDITIONS OF THE V KENT COUNTY, DE RECORD INFORMATION. V EXISTING MAIN. POSSIBLE CONDITIONS THAT WOULD REQUIRE TAPPING RELOCATION INCLUDE PROXIMITY TO PIPE JOINTS, SHEET TITLE V 24x36 3. PROPERTY SHOWN HEREON IS SUBJECT TO ANY RIGHT-OF-WAY, EASEMENTS, RESTRICTIONS, ETC. AS MAY BE SHOWN V OTHER TAPS, CONCRETE ENCASEMENTS, CONFLICT WITH OTHER UTILITIES, AND THE LIKE. TEST HOLES MUST BE PERFORMED V 24x36

OR NOTED IN ANY RECORD, PUBLIC OR OTHERWISE, OR ANY REQUIREMENT OR REGULATION OF ANY PUBLIC AGENCY. V V BY THE CONTRACTOR TO DETERMINE THE BEST TAPPING LOCATION. THE CITY OF DOVER WILL NOT BE HELD RESPONSIBLE 4. THE EXISTING UTILITIES SHOWN WERE TAKEN FROM THE BEST AVAILABLE RECORDS. ADDITIONALLY, A UTILITY MARK-OUT V V V V FOR FIELD CONDITIONS REQUIRING ADJUSTMENT OF THE TAPPING LOCATION OR FOR ANY WORK REQUIRED BY THE CONTRACTOR TO MAKE AN APPROPRIATE AND LAWFUL CONNECTION. V COVER SHEET WAS PROVIDED BY CENTURY ENGINEERING IN SEPTEMBER 2017. THE CONTRACTOR SHALL CONTACT MISS UTILITY OF 24x36 V DELMARVA (1-800-282-8555) AND ENGAGE A PRIVATE UTILITY LOCATOR TO VERIFY THEIR EXACT LOCATION PRIOR TO THE START OF ANY CONSTRUCTION. ANY DAMAGE INCURRED TO ANY UTILITIES SHALL BE REPAIRED IMMEDIATELY AT THE 21. V IF THE APPROVED PLAN NEEDS TO BE MODIFIED DUE TO ERRORS OR OMISSIONS OR FIELD CONDITIONS, ADDITIONAL V AND OVERALL 24x36

SEDIMENT AND STORM WATER CONTROL MEASURES MAY BE REQUIRED AS DEEMED NECESSARY BY THE KENT CONSERVATION CONTRACTORS EXPENSE. IF THE CONTRACTOR RELIES ON THE UTILITY LOCATIONS SHOWN HEREON, HE DOES SO AT HIS V OWN RISK AND WILL NOT BE ENTITLED TO ADDITIONAL COMPENSATION DUE TO TIME DELAYS FROM SAID RELIANCE. DISTRICT (KCD). V V SITE PLAN 22. THE KENT CONSERVATION DISTRICT (KCD) RESERVES THE RIGHT TO ENTER PRIVATE PROPERTY FOR PURPOSES OF . 1364.18' 24x36

  • 5.FLOODPLAIN: PARCEL IS LOCATED WITHIN ZONE "X", AREA OF MINIMALV FLOOD HAZARD, BASED ON FEMA FIRM MAP PERIODIC SITE INSPECTION. V 24x36

V 10001C0188J, EFFECTIVE DATE JULY 7, 2014. V V V V 23. ALL WATER AND WASTEWATER UTILITY COMPONENTS MUST MEET THE REQUIREMENTS OF THE CITY OF DOVER WATER 6. V ALL ROADS, PARKING AND OTHER PAVED AREAS WILL BE PRIVATELY OWNED AND MAINTAINED AND ARE NOT INTENDED V V & WASTEWATER DEPARTMENT SPECIFICATIONS. V 24x36 FOR DEDICATION. 24x36

V24. ALL EXISTING UTILITIES SHALL BE ADJUSTED TO FINAL GRADE IN ACCORDANCE WITH CURRENT CITY OF DOVER 7. DELAWARE REGULATIONS PROHIBIT THE BURIAL OF CONSTRUCTION DEMOLITION DEBRIS, INCLUDING TREES AND STUMPS V V REQUIREMENTS AND PRACTICES. V ON CONSTRUCTION SITES. ANY SOLID WASTE FOUND DURING EXCAVATION MUST BE REMOVED AND PROPERLY DISCARDED. V 25. PRIOR TO THE START OF V V CONSTRUCTION OR ORDERING OF MATERIALS, THE CONTRACTOR SHALL ENGAGE A PRIVATE 8. ALL HANDICAPPED PARKING DEMARCATION, STALLS, AND BUILDING ACCESSIBLE ROUTES SHALL COMPLY WITH THE UTILITY LOCATOR VTO VERIFY LOCATIONS OF ALL EXISTING UTILITIES WITHIN THE PROJECT EXTENTS AS WELL AS VERIFYING 24x36 V V 24x36

"AMERICAN WITH DISABILITIES ACT" AND ANSI ICC A117.1 - 2017 " ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES"

N 29° 00' 53" W ELEVATIONS OF ALL UTILITIES TO BE CROSSED WITH NEW IMPROVEMENTS. CONTRACTOR SHALL REPORT V 9. THIS DRAWING DOES NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. ALL CONSTRUCTION MUST BE CONFLICTS/ISSUES TO THE ENGINEER. 0 40 80 160 DONE IN COMPLIANCE WITH THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 AND ALL RULES AND REGULATIONS 26. ALL SUBSURFACE UTILITIES SHOWN HEREON ARE BASED ON BASED ON SURFACE EVIDENCE COLLECTED FROM THE FIELD THERETO APPURTENANT. V V 24x36 TOPOGRAPHIC SURVEY AND THE BEST AVAILABLE RECORDS. 24x36

  • 10.BEFORE THE CONTRACTOR CAN BEGIN CONSTRUCTION HE MUST OBTAIN THE PROPER PERMITS AND/OR APPROVALS FROM 27. STANDARD CITY OF DOVER SIDEWALK, AS PER CHAPTER 98, ARTICLE IV OF THE VDOVER CODE OF ORDINANCES, SHALL BE Do Not Explode - Select Scale

THE CITY OF DOVER (C.O.D.), DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL (DNREC), DELAWARE DEPARTMENT OF TRANSPORTATION (DELDOT) , KENT CONSERVATION DISTRICT (KCD) AND ALL APPROPRIATE STATE AND REQUIRED TO BE INSTALLED ALONG THE ENTIRE PUBLIC STREET FRONTAGE OF A PROPERTY. WHERE FRONTAGE SIDEWALK EXISTS BUT DOES NOT MEET THE STANDARDS OF CHAPTER 98, ARTICLE IV, THE SIDEWALK V SHALL BE RE-LAID TO MEET THE V SCALE: 1" = 80' 24x36

COUNTY AGENCIES. STANDARDS. SIDEWALK SHALL INCLUDE BARRIER-FREE ACCESS RAMPING AT POINTS OF INTERSECTION WITH STREET 20' B.R.L. 24x36

V

CROSSINGS AND AT OTHER LOCATIONS SO AS TO AFFORD REASONABLE BARRIER-FREE PEDESTRIAN MOVEMENT AND SITE ISSUE BLOCK 11. ALL CONSTRUCTION METHODS AND MATERIALS SHALL BE ACCORDING TO THE CITY OF DOVER WATER & WASTEWATER FIRC ACCESS. V DEPARTMENT AND THE STATE OF DELAWARE (DELDOT) STANDARDS AND CONSTRUCTION SPECIFICATIONS. V 28. IN ACCORDANCE WITH APPENDIX A, ARTICLE VI, SECTIONS B.3, ALL SIDEWALKS SHALL ASCEND FROM THE CURBSTONE V TO 389.33' S 59° 07' 38" W 24x36 12. ALL FIRE LANE DEMARCATION AND FIRE LANE SIGNS SHALL BE IN ACCORDANCE WITH ALL STATE FIRE PREVENTION THE BUILDING LINE AT THE RATIO OF ONE-QUARTER INCH TO THE FOOT. NOTHING IN THIS SECTION SHALL BE CONSTRUED TO 24x36

REGULATIONS. V

AFFECT ANY PAVEMENT PREVIOUSLY LAID BY ORDER OF THE CITY COUNCIL, UNTIL IT IS TAKEN UP AND RE-LAID. 13. ALL WORK WITHIN CITY/DELDOT MAINTAINED ROAD RIGHT-OF-WAYS SHALL MEET THE REQUIREMENTS AS SET FORTH IN THE 29. AT IT'S MEETING ON XXX XX, 2026, THE CITY OF DOVER PLANNING COMMISSION GRANTED CONDITIONAL APPROVAL CURRENT REVISION OF THE STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION, BY THE DELAWARE OF SITE DEVELOPMENT PLAN APPLICATION # 24x36 24x36

DEPARTMENT OF TRANSPORTATION AND ALL CITY OF DOVER REQUIREMENTS. NOTE: 14. TRAFFIC AND SAFETY CONTROL SHALL BE MAINTAINED DURING CONSTRUCTION IN CONFORMANCE WITH THE CURRENT VERSION OF THE DELAWARE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. PRIOR TO THE START OF CONSTRUCTION OR ORDERING OF OWNERS CERTIFICATION 15. STORMWATER MANAGEMENT AND SEDIMENT / EROSION CONTROL SHALL BE IN ACCORDANCE WITH THE CURRENT VERSION MATERIALS, THE CONTRACTOR SHALL ENGAGE A PRIVATE UTILITY 24x36 24x36

WE, RICHARD E. PIERSON CONSTRUCTION CO, INC., HEREBY CERTIFY THAT WE ARE THE OWNER OF THE PROPERTY DESCRIBED DELAWARE SEDIMENT AND STORMWATER REGULATIONS BY THE DELAWARE DEPARTMENT OF NATURAL RESOURCES AND AND SHOWN ON THIS PLAN, THAT THE PLAN WAS MADE AT OUR DIRECTION, AND THAT WE ACKNOWLEDGE THE SAME TO BE OUR ENVIRONMENTAL CONTROL. LOCATOR TO VERIFY LOCATIONS OF ALL EXISTING UTILITIES WITHIN ACT AND DESIRE THE PLAN TO BE DEVELOPED AS SHOWN IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS. . . . 16. CONTRACTOR SHALL REFER TO ARCHITECTURAL/STRUCTURAL DRAWINGS OF PROPOSED STRUCTURES FOR ALL DIMENSIONS . 24x36

OF BUILDINGS AND FOUNDATIONS. PROPOSED BUILDING FOOTPRINTS, AS SHOWN ON SITE PLAN, SHOULD ONLY BE USED AS THE PROJECT EXTENTS AS WELL AS VERIFYING ELEVATIONS OF ALL MARK DATE DESCRIPTION 24x36

A REFERENCE TO THE ABOVE MENTIONED PLANS. UTILITIES TO BE CROSSED WITH NEW IMPROVEMENTS. CONTRACTOR NICK HETRICK, GENERAL MANAGER DATE LAYER STATE: C-001

  • 17.HYDRANT CONNECTIONS BY THE CONTRACTOR ARE PROHIBITED. THIS METHOD MAY NOT BE UTILIZED DURING ANY PHASE OF PROJECT NO.: 2025302.00 24x36 THE PROJECT. SHALL REPORT CONFLICTS/ISSUES TO THE ENGINEER. 24x36
  • 18.ALL EXISTING SANITARY SEWER LINES, STORM DRAINS, AND WATER LINES NOT USED FOR THE PROPOSED FACILITY ENGINEERS CERTIFICATION DATE: 12-5-25 MUST BE PROPERLY ABANDONED AT THE MAINS IN ACCORDANCE WITH THE CITY OF DOVER WATER & WASTEWATER SHEET INDEX I, J. MICHAEL RIEMANN, P.E., HEREBY CERTIFY THAT I AM A REGISTERED ENGINEER IN THE STATE OF DELAWARE, THAT THE SCALE: 1" = 80' DEPARTMENT REQUIREMENTS PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. INFORMATION SHOWN HEREON HAS BEEN PREPARED UNDER MY SUPERVISION AND TO MY BEST OF MY KNOWLEDGE AND DRAWN BY: A.J.S. PROJ. MGR.: M.J.H. 24x36 24x36
  • 19.PART II, CHAPTER 180, ARTICLE III, SECTION 180-10 OF THE CODE OF KENT COUNTY REQUIRES THAT "NO PERSON SHALL C-001 COVER SHEET AND OVERALL SITE PLAN BELIEF REPRESENTS GOOD ENGINEERING PRACTICES AS REQUIRED BY THE APPLICABLE LAWS OF THE STATE OF DELAWARE. DISCHARGE OR CAUSE TO BE DISCHARGED ANY STORMWATER, SURFACE WATER, UNCONTAMINATED GROUNDWATER, ROOF C-101 EXISTING CONDITIONS AND DEMOLITION PLAN SHEET RUNOFF, SUBSURFACE DRAINAGE, UNCONTAMINATED NONCONTACT COOLING WATER, CONDENSATE, OR UNPOLLUTED C-201 SITE, UTILITY, GRADING PLAN 24x36 INDUSTRIAL PROCESS WATERS TO ANY SANITARY SEWER". THE CONTRACTOR/DEVELOPER SHALL ENSURE DURING CONSTRUCTION THAT NO ILLEGAL DISCHARGES TO THE SANITARY SEWER SYSTEM ARE CREATED WITH THE SITE IMPROVEMENTS. L-001 LANDSCAPE PLAN
  • J.MICHAEL RIEMANN, P.E DATE C-001 COPYRIGHT 2025 24x36

103 F:\Projects\2025\202530200\10_Civil\DWG\2025302-SITE-C3D21.dwg, Dec 04, 2025 - 8:23am

.PDF

24x36 24x36

2025-12-04

Página 104

24x36 24x36

Item 4.

24x36 24x36

24x36 24x36

24x36 24x36

24x36
ARCH I T E C TURE 24x36

ENG I NE E R I NG

Delaware
24x36 24x36

Dover 302.734.7950 EX. S.D. M.H.: EX. S.D. M.H.: Newark 24x36 RIM: 20.94' INV.: 18.11' STORM C-EX-U-SD-MH-4ID

15STORM
C-EX-U-SD-MH-4ID
RIM: 20.82'
INV.: 17.94'302.369.370024x36

15

15
15"X24" R.C.P.
INV: 16.88' 15" R.C.P.
INV: 16.91'
W.M.
Maryland
15

12" R.C.P.

EX. SAN. MH.:15"X24" R.C.P.15
20
2019
Salisbury
EDGE OF PAVEMENTW.V.
SEW

INV: 23.44' ER

12" R.C.P. 12" R.C.P. 19 INV: 18.21' 410.546.9100

C-EX-U-Sewer-MH-4ID

24x36 24x36

FIRCINV: 23.24'INV: 23.13'
RIM EL.: 19.67'18
2712" R.C.P.
1917
2725INV: 23.49'202017
F.H.
2422F.H.212015
15
18
19
F.H.
North Carolina
27
C-EX-U-SD-MH-4ID
W.V.24FIP4
22321
STORM

24 EX. S.D. M.H.:

24x36 W.V. EX. 12"W 24 24 W.V. EX. 12"W W.V. EX. 12"W RIM: 19.77' INV.: 16.82' W.V. Charlotte W.V. 23 22 980.270.9100 24x36

272625W.V.
20
LAFFERTY LANE
EX. SAN. MH.:
RIM EL.: 26.08'VARYING WIDTH PUBLIC RIGHT OF WAYEX. SAN. MH.:15Raleigh
23
EX. SAN. MH.:EX. SAN. MH.:EX. SAN. MH.:
INV. IN: 12.69'2625RIM EL.: 19.99'

EX. 8"S ER
SEW
KCR 347, MINOR COLLECTOR RIM EL.: 23.24'
INV. IN: 11.30'
ER
SEW

C-EX-U-Sewer-MH-4ID
22
EX. 8"S ER
SEW

C-EX-U-Sewer-MH-4ID
21
RIM EL.: 20.89'
INV. IN: 10.55'
EX. 8"S
INV. IN: 9.90'

20 ER
SEW

C-EX-U-Sewer-MH-4ID
ER
SEW

C-EX-U-Sewer-MH-4ID
RIM EL.: 20.00'
INV. IN: 9.74'
EX. 8"S
919.243.1332
C-EX-U-Sewer-MH-4ID

24x36

26GG
24GGGGGGGG.V.Wilmington24x36

G OE
26 OE OE OE OE OE OE
EX. 24" F.M.
OE 19 STORM

C-EX-U-SD-MH-4ID

OEOEOE910.341.7600
OE20
S.V.
S.V.
EDGE OF PAVEMENT20BENCH MARK 1
FCM
25
26
OE
G
1819
IRON ROD W/ CAP
ELEV.: 20.26'
www.beckermorgan.com
24x36

25 222.76' N 59° 08' 10" E 649.41' N: 418262.3181' 24x36

G FIRC N 58° 13' 54" E 15" R.C.P. E: 635357.8644'
24 25
15" R.C.P. INV: 17.42'
INV: 22.85' OE
23 " F.M.
EX. S.D. M.H.:

26

EX. 24EX. GRAVEL ENTRANCE19
RIM: 19.86'
INV.: 16.94'
OEDELDOT PERMANENT EASEMENT20' WIDE SEWER EASEMENT
26G
24x36
15
ER
SEWPER P.B. 150-8620TO THE CITY OF DOVERW.V.
26
24x36
C-EX-U-Sewer-MH-4ID

FCM OE 24 W.M.

EX. SAN. F.M. MH.:20' WIDE DRAINAGE EASEMENT21PER P.B. 150-86
26RIM EL.: 27.94'
10' WIDE PERMANENT EASEMENTEXISTING GRAVELEX. BUILDING
15" R.C.P.
23 4
10' WIDE PERMANENT EASEMENTTO THE STATE OF DELAWARE
INV: 22.35'
2 5TO BENEFIT KENT COUNTY LEVY23TO BE REMOVED2219W.V.
225TO BENEFIT KENT COUNTY LEVYPER P.B. 150-86F.H.
G26
24x36
OECOURT FOR PURPOSE OFCOURT FOR PURPOSE OF24x36

SANITARY SEWER SANITARY SEWER (D.R. 612-42) (D.R. 612-42)

CASSIDY DRIVE

2520
24x36
2524x36

25 G 23

S 30° 51' 49" E

2524
24
24x3624x36

OE
21
24
G 22

EX. GRAVEL DRIVE

24x36 24x36
W.V.

RADIUS: 500.00'

24ARC LENGTH: 698.75'EX. BUILDING
CHD. BRG: N 18° 25' 24" E2320
23CHD. LENGTH: 643.26'
24x3624x36

OE 25 ER SEW

C-EX-U-Sewer-MH-4ID

EX. SAN. MH.:

GRASSRIM EL.: 19.92'
INV. IN: 10.67'
G21
AREA
24x36
23W.V.
.24x36
EDGE OF PAVEMENT21
25W.V.

W.V. F.H.
24x36

LANDS N/F

EX. BUILDING N 24x36

21

23RICHARD E. PIERSON CONSTRUCTION CO.EXISTING GRAVELEXISTING SOIL STOCKPILE
OE2221
24x36
25GT.P.: 2-05-07700-01-2803-00001TO BE REMOVEDTO BE REMOVED
GRASS2024x36

24
EF

DEED REF.: 13381-273221STOCK PILE
AREALANDS N/F
23DELMARVA LAND HOLDINGS, LLC
PB. REF.: 72-95 & 150-862
21T.P.: 2-05-07700-01-2804-000
23- XR24
25
22
23
24
DEED REF.: 10622-123
25
2424ZONING: M
22
24x3624x36

23

PZ129.6135 ACRES ±22
21
20
23
22
2120' WIDE DRAINAGE EASEMENT
TO THE STATE OF DELAWARE
EA2020PER P.B. 150-86
24x3624x36

OE G 20' WIDE DRAINAGE EASEMENT21 ON PROJECT TITLE
TO THE STATE OF DELAWARE 21
PER P.B. 150-86
YZ W.V.

20 20
24x36
FCM

24
10' WIDE PERMANENT EASEMENT
VE

RLA20
EX. BUILDING
R.E. PIERSON24x36

24x36
23

FCM23TO BENEFIT KENT COUNTY LEVY
COURT FOR PURPOSE OF
SANITARY SEWER
SO
20
GRASS
AREAREGIONAL HQ24x36

(D.R. 612-42)
ON

GVIR20
OE20
24x36
EN1924x36

BENCH MARK 2
RT
ANE
19 IRON ROD W/ CAP

WID
ELEV.: 18.97'
22 19 N: 417809.0131'
PO

KCR 3 TH PUBLIC

E: 635568.0252'18"X30" R.C.P.
INV: 16.80'
GRASS19
24x36

AREA AIR 19 19 F.H.

18"X30" R.C.P.
24x36

47, MIN
19
R
INV: 16.84'

OR CO IGHT OF WA 24 -A 18

LAFFE

EXISTING GRAVEL18
18"X30" R.C.P.
18"X30" R.C.P.
TO BE REMOVEDINV: 16.87'
18

G NE 19 20 20 INV: 17.15'

RTY L

18"X30" R.C.P.
24x36 19 24x36

ZO
LLECT
INV: 17.11'

Y
19

ING
OE SE
18"X30" R.C.P.
30 LAFFERTY LANE
9
OR
21

21 20 1 18 INV: 17.19' 19 24" R.C.P. INV: 20.40' NO SEW EX. SAN. MH.: RIM EL.: 19.40' CITY OF DOVER 18 ER

I
C-EX-U-Sewer-MH-4ID

INV. IN: 12.04'

24x36
19 24x36

VARY

2320
24
21
22
KENT COUNTY, DE
2123
24
22SHEET TITLE
192223
24x36

20 2021 24x36

24" R.C.P. INV: 20.41' G 20 22 22 21 EDGE OF WOODS STOCK PILE 19

19
EXISTING
24x36

OE21EDGE OF WOODS
18
CONDITIONS AND24x36
EDGE OF PAVEMENTVV
20
VV17DEMOLITION PLAN
24x36

V

V18
.24x36

MAPPED WETLAND LINE V

G
25
24x36
V V 24x36

V
FIRC
OE 25 25' WETLAND BUFFER V
V
EX. 24 V
24x36 24x36

" F.M. "W

13' 04 V 20' WIDE DRAINAGE EASEMENT V TO THE STATE OF DELAWARE V V S 48° 0 30 60 120 MAPPED WETLAND LINE V PER P.B. 150-86 V V V V V V 24x36 G V V LANDS N/F 24x36

V MATTHEW E. MITTEN

V T.P.: 2-05-07700-01-2700-000 Do Not Explode - Select Scale V

639.99'
DEED REF.: 8538-63
ZONING: IPM SCALE: 1" = 60'
EDGE OF WOODS V
24x36
V 24x36

V

° 36' 44
OE V ISSUE BLOCK

"W

20V
24
2223
V
24x36V24x36

2021 MAPPED WETLAND LINE V V N 2G1 V V V V V 48" R.C.P. V 48" R.C.P. 24x36 INV: 19.03' 19 INV: 18.83' V 24x36

VV
48
19
4820
21VV
22V
25
23VLANDS N/FV
V
24x36

24 24 MATTHEW E. MITTEN

24x36

250'
1093.7VT.P.: 2-05-07700-01-2700-000
DEED REF.: 8538-63
V
V
ZONING: IPM
FIRCVV.
...
24x3624x36
VVV
MARKDATEDESCRIPTION
VVLAYER STATE: C-101
V
2626
V
VPROJECT NO.:2025302.00
24x36
V24x36

V V DATE: 12-5-25 V V

V
V
SCALE: 1" = 60'
24x36

V V V DRAWN BY: A.J.S. PROJ. MGR.: M.J.H. 24x36

V
V
SHEET
V V

C-101
24x36
V V 24x36

V V V

V COPYRIGHT 2025 104 F:\Projects\2025\202530200\10_Civil\DWG\2025302-SITE-C3D21.dwg, Dec 04, 2025 - 8:20am

.PDF

24x36 24x36

2025-12-04

Página 105

24x36 24x36

12" R.C.P.Item 4.
EX. SAN. MH.:SE15"X24" R.C.P.1520
2019W.V.
INV: 23.44'12" R.C.P.12" R.C.P.
WER

C-EX-U-Sewer-MH-4ID

RIM EL.: 19.67' 19 INV: 18.21' 15

18
24x36

FIRC INV: 23.24' INV: 23.13' 24x36

12" R.C.P.1917
17
25 INV: 23.49'202015
2420
15
18F.H.
22F.H.2115
15

C-EX-U-SD-MH-4ID

15 19
24x36

24FIP
2423
21
STORM
24x36

24
12
EX. S.D. M.H.:

24RIM: 19.77'
W.V.W.V.
EX. 12"W24
W.V.EX. 12"WINV.: 16.82'
EX. 12"W15
W.V.22W.V.
24x36
23W.V.2024x36

25
LAFFERTY LANE
VARYING WIDTH PUBLIC RIGHT OF WAY EX. SAN. MH.: 15

EX. SAN. MH.: EX. SAN. MH.: EX. SAN. MH.:

24x36
25
KCR 347, MINOR COLLECTOR RIM EL.: 23.24'
23
22 21
RIM EL.: 20.89'
RIM EL.: 19.99'
INV. IN: 9.90' RIM EL.: 20.00' ARCH I T E C TURE 24x36

INV. IN: 11.30' INV. IN: 10.55' INV. IN: 9.74' OE SE WER

C-EX-U-Sewer-MH-4ID

EX. 8"S SE WER

C-EX-U-Sewer-MH-4ID
EX. 8"S 20 SE
WER
C-EX-U-Sewer-MH-4ID
SE
WER

C-EX-U-Sewer-MH-4ID
EX. 8"S ENG I NE E R I NG
15

G G G G G G G G G G G G G

21

GGGGGGDelaware
24x362424x36

22
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE STORM
OE OE OE OE Dover
19 C-EX-U-SD-MH-4ID

302.734.7950
20 EX. 24" F.M.
Newark
20
15

24x36

23 20 BENCH MARK 1 302.369.3700 24x36

45'R IRON ROD W/ CAP Maryland
W.M.
19
N 59° 08' 10" E PR. SIDEWALK 649.41' 18 ELEV.: 20.26'
222.76' 45'R N: 418262.3181' Salisbury
24x36

PR. MONUMENT 6" S 22 15" R.C.P. E: 635357.8644' 410.546.9100 24x36

SIGN21INV: 17.42'
PR. CROSSWALK25'PR. SIDEWALK20' WIDE SEWER EASEMENTEX. S.D. M.H.:North Carolina
TO THE CITY OF DOVERRIM: 19.86'
2319INV.: 16.94'Charlotte
24x36
DELDOT PERMANENT EASEMENTPER P.B. 150-8624x36
15'R5'2210'980.270.9100
PER P.B. 150-86R18'10R20
5'Raleigh
EF40' B.R.L.2040' B.R.L.W.V.
W.M.
919.243.1332
Wilmington
- XR
24x36

PR. SITE LIGHTING TYP. 24x36

PR. CURBPR. CURB
20' WIDE DRAINAGE EASEMENT25'21910.341.7600
TO THE STATE OF DELAWAREPR. PAVEMENTPR. CURB OPENING
PZ110' WIDE PERMANENT EASEMENT22
www.beckermorgan.com
24x36
TO BENEFIT KENT COUNTY LEVY2322
2124x36
ZOCOURT FOR PURPOSE OF19W.V.F.H.
NE
EX. BUILDING
101.75'
SANITARY SEWER21
5'
R
A
(D.R. 612-42)5'R10'
15'R18'9
24x3624x36

LAY 21

ER 5'

CASSIDY DRIVE

24x36
OV 22 20' 10' 22 24x36

22PR. SIDEWALK2120
IROPR. BIKE RACK (2)
NS20
24x3624x36

NV
2" W
23
PR. SEWER LATERAL

RTWITH CLEANOUT20
E191.43'
24x36

PO 24x36

S 30° 51' 49" E
AIR 25' 21
PR. SITE LIGHTING TYP. PR. DRAINAGE SWALE
24x36 24x36

22PROPOSED OFFICE
6" S9,900 S.F.PR. 2" DOMESTIC WATER19
21

F.F. EL.: 22.50' SERVICE WITH METER 19

24x36

AT PROPERTY LINE 24x36

22

-A W.V.

20' B.R.L.
24x36 24x36

NE
.

2121ZO
24x36
ISEN24x36
PR. DUMPSTERNO20
EX. BUILDING
AREA 12' X 24'
20
15'R1919
24x3624x36
2018
18SE
WER
C-EX-U-Sewer-MH-4ID

22 22 EX. SAN. MH.:

RIM EL.: 19.92'

24x36

PR. SLIDING GATE INV. IN: 10.67'

24x36

2120
19
18
2017W.V.
24x36

PR. PAVEMENT 24x36

PROJECT TITLE

LANDS N/F212165'WPR. 8' CHAIN LINK FENCE
RICHARD E. PIERSON CONSTRUCTION CO.4"
WITH PRIVACY
6" S
PR. DRAINAGE SWALE3/
24x36
T.P.: 2-05-07700-01-2803-00001
DEED REF.: 13381-273
PB. REF.: 72-95 & 150-86
22SCREENING SLATS

22
W.V.

W.V. F.H.
R.E. PIERSON 24x36

24x36
29.6135 ACRES ±
PR. 8' CHAIN LINK FENCE
WITH PRIVACY
REGIONAL HQ 24x36

SCREENING SLATS EX. BUILDING 21

21
24x36 24x36

21
21 19 17

20 20 18 20
24x36

40'
PROPOSED GARAGE 25' 24x36

GRASS9,900 S.F.LANDS N/F
AREA21 F.F. EL.: 22.50'
2222
145.43'
DELMARVA LAND HOLDINGS, LLC
2223
24x36

24
21 T.P.: 2-05-07700-01-2804-000 24x36

22

202523DEED REF.: 10622-123
25
24
ZONING: M30 LAFFERTY LANE
2424
24x36
222323CITY OF DOVER24x36

22

2122
20' WIDE DRAINAGE EASEMENTKENT COUNTY, DE
2021
TO THE STATE OF DELAWARESHEET TITLE
PER P.B. 150-86
24x36

22 24x36

20 20
SITE PLAN
24x36

PR. PAVEMENT

. 24x36

80'
21
17
18
19
W.V. .
20
24x36

20 21 20 21 . 24x36

PR. SWM. AREA

20
24x36

PR. 8' CHAIN LINK FENCE 24x36

WITH PRIVACY EX. BUILDING

SCREENING SLATS

20PR. SITE LIGHTING TYP.
20
19
24x3624x36

20

2019
200153060
20
PR. SLIDING GATE1918
2019
24x361824x36
2019Do Not Explode - Select Scale
20
SCALE: 1" = 30'
PR. DRAINAGE SWALE20
24x36
PR. CULVERT PIPE24x36

20
19 ISSUE BLOCK

19 19
24x36

BENCH MARK 2 24x36

19IRON ROD W/ CAP
ELEV.: 18.97'
19N: 417809.0131'
24x36

E: 635568.0252' 18"X30" R.C.P. 24x36

INV: 16.80'

19F.H.
19
18
24x36
191920
18

18"X30" R.C.P.
24x36

17
19 18
18
INV: 16.84'
18
18
.
18

18"X30" R.C.P. . . .
24x36
18"X30" R.C.P. 24x36

18
18

INV: 16.87'MARKDATEDESCRIPTION
INV: 17.15'
20LAYER STATE: C-201
1918
201918"X30" R.C.P.
INV: 17.11'PROJECT NO.:2025302.00
24x3624x36
19DATE:12-5-25
18"X30" R.C.P.
21
19
2117INV: 17.19'SCALE:1" = 30'
18
DRAWN BY:A.J.S. PROJ. MGR.: M.J.H.
24x3624x36
1920
EX. SAN. MH.:
20SE
WER
RIM EL.: 19.40'
18
C-EX-U-Sewer-MH-4ID
INV. IN: 12.04'SHEET
GRASS1919
AREA18
24x36

20

2120
19
18C-20124x36

20' B.R.L. 22 COPYRIGHT 2025 105 F:\Projects\2025\202530200\10_Civil\DWG\2025302-SITE-C3D21.dwg, Dec 04, 2025 - 7:42am

.PDF

24x36 24x36

2025-12-04

Página 106

24x36 24x36

24Item 4.
1221
24
24EX. 12"W
GENERAL LANDSCAPE NOTES :
24x36
EX. 12"W15
24x36

23 22 25 20 1. QUALITY AND SIZE OF PLANTS, SPREAD OF ROOTS, AND SIZE OF BALLS SHALL BE IN ACCORDANCE WITH THE LAFFERTY LANE CURRENT STANDARDS OF THE AMERICAN ASSOCIATION OF NURSERYMEN "AMERICAN STANDARDS FOR NURSERY STOCK." 24x36

VARYING WIDTH PUBLIC RIGHT OF WAY 23

15
24x36

25 EVERGREEN TREES SHALL HAVE A FULL, WELL-BRANCHED, CONICAL FORM TYPICAL OF THE SPECIES.

KCR 347, MINOR COLLECTOR2221
OESE
20
SE
WER

EX. 8"S EX. 8"S

SE C-EX-U-Sewer-MH-4ID

WER SE WER

ALL DECIDUOUS SHADE TREES SHALL BRANCH A MINIMUM OF 7'-0" ABOVE GROUND LEVEL. TREES SHALL BE WER C-EX-U-Sewer-MH-4ID

C-EX-U-Sewer-MH-4ID

C-EX-U-Sewer-MH-4ID

15
24x36

G G G G G G G G G G G G G G G G G

PLANTED AND STAKED IN ACCORDANCE WITH THE DETAIL SHOWN. 24x36

21G
24
OEOEOE22
OE OE OE OE OE OE OE OE OE OE OE OE OE OE PLANT MATERIALS DELIVERED TO THE SITE IN UNCOVERED TRUCKS WILL BE REJECTED.
STORM

19
ARCH I T E C TURE
C-EX-U-SD-MH-4ID

20 EX. 24" F.M. 24x36 UNACCEPTABLE PLANT MATERIALS: MATERIALS WHICH HAVE DAMAGED OR CROOKED LEADERS, DEFORMED 24x36

20 GROWTH HABIT, ABRASIONS OF THE BARK, SUN SCALD, WINDBURN, DISFIGURING NOT COMPLETELY CALLUSED ENG I NE E R I NG 15

23 20 WILL BE REJECTED. IN ADDITION, TREES HAVING THEIR CENTRAL LEADERS HEADED BACK WILL ALSO BE

18 19 REJECTED. PLANTS WITH LOOSE OR CRACKED ROOT BALL OR CONTAINERS WILL BE REJECTED. Delaware 24x36 N 59° 08' 10" E 649.41' 24x36

309 South Governors Avenue 6" S 2. ALL PLANTS SHALL BE PLANTED IN TOPSOIL THAT IS THOROUGHLY WATERED AND TAMPED AS BACKFILLING 3 22 14 21 PROGRESSES. NOTHING BUT SUITABLE TOPSOIL, FREE OF DRY SOD, STIFF CLAY, LITTER, STONES IN EXCESS OF Dover, DE 19904 CR CR ONE (1) INCH DIAMETER, ETC. SHALL BE USED FOR PLANTING. 302.734.7950 24x36

23
The Tower at STAR Campus 24x36

19 MULCH FOR PLANTING BEDS SHALL BE SHREDDED HARDWOOD BARK MULCH UNLESS OTHERWISE SPECIFIED ON 100 Discovery Boulevard, Suite 102 22 THE PLANS AND SHALL HAVE NO LEAVES, YOUNG GREEN GROWTH, BRANCHES, TWIGS, GREATER IN DIAMETER 10 20 OF ½", WEEDS, SHAVINGS OR FOREIGN MATERIAL SUCH AS STONES, ETC. SHALL BE MIXED WITH THE MULCH. Newark, DE 19713 ALL SHRUB MASSES SHALL BE PLANTED IN CONTINUOUS MULCHED BEDS WITH A LIGHTLY COMPACTED DEPTH 302.369.3700 24x36

40' B.R.L. 20 40' B.R.L. 24x36

OF THREE (3) INCHES. ALL CONTAINER PLANTS ARE TO HAVE ROOTS CUT ON FOUR SIDES AND/ OR SPREAD OUT Maryland

5IN NEW SOIL MIXTURE.
21312 West Main Street, Suite 300
TG 3. ALL AREAS NOT STABILIZED IN PAVING OR PLANT MATERIALS SHOULD BE SEEDED AND MULCHED. (SEE EROSION Salisbury, MD 21801
24x36

22 24x36

ERNMX-18621
& SEDIMENT CONTROL PLAN AND NOTES.)410.546.9100
2322
19North Carolina
21 4. LANDSCAPE BEDS NOT DEFINED BY CURBS, SIDEWALKS, WALLS OR OTHER STRUCTURES SHALL BE ENCLOSED
BY ALUMINUM EDGING UNLESS OTHERWISE INDICATED.3333 Jaeckle Drive, Suite 120
24x3624x36
9Wilmington, NC 28403
5. AREAS DISTURBED BY LANDSCAPE OPERATIONS SHALL BE GRADED TO MATCH EXISTING TOPSOIL AND SEED OR
21SOD AS REQUIRED.
910.341.7600
ERNMX-186 GROUND COVER IN5www.beckermorgan.com

CASSIDY DRIVE

24x36 24x36

REMAINDER OF PROPERTY 6. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO UTILITIES AND MAY MAKE MINOR ADJUSTMENTS IN 22 2 PA SPACING AND/OR LOCATION OF PLANT MATERIALS. CONTRACTOR TO VERIFY "AS BUILT" LOCATION OF ALL

EXTENTS2221
2220UTILITIES.
CF
24x36
  • 7.NO PLANT, EXCEPT GROUNDCOVERS, SHALL BE WITHIN THREE (3) FEET FROM SIDEWALKS. 24x36

20

2" W 23 8. NO TREE SHALL BE PLANTED CLOSER THAN TEN (10) FEET FROM ANY STRUCTURE OR BUILDING. 20 24x36 8 9. NO TREE SHALL BE PLANTED WITHIN TEN (10) FEET OF UNDERGROUND UTILITIES OR FIRE HYDRANTS. 24x36

NS

S 30° 51' 49" E 10. ONLY TREES THAT REACH A HEIGHT AND SIZE AT MATURITY OF SMALL TO MEDIUM SHALL BE PLANTED UNDER POWER LINES. 21 24x36 24x36

  • 11.THE CONTRACTOR SHALL WATER ALL PLANTS THOROUGHLY TWICE DURING THE FIRST 24-HOUR PERIOD 5 AFTER PLANTING, AND THEN WEEKLY OR MORE OFTEN, IF NECESSARY, DURING THE FIRST GROWING SEASON, 22 PROPOSED OFFICE UNLESS THE OWNER AGREES TO MAINTAIN AND WATER THEM. 6" S 9,900 S.F. 19 21 PS 24x36 24x36

F.F. EL.: 22.50' 19 12. TREES TO REMAIN ON-SITE SHALL BE PROTECTED WITH SNOW FENCE DURING CONSTRUCTION (SEE DETAIL). SNOW FENCING TO BE MAINTAINED DURING CONSTRUCTION BY CONTRACTOR. 22 24x36 13. THE PLANTING PLAN SHALL TAKE PRECEDENCE OVER THE PLANT SCHEDULE SHOULD ANY PLANT QUANTITY 24x36

DISCREPANCIES OCCUR.

20' B.R.L. 14. NO SUBSTITUTIONS SHALL BE MADE WITHOUT APPROVAL OF THE OWNER AND/ OR THE LANDSCAPE ARCHITECT. 21 24x36 21 5 24x36

TG 15. ALL NEW TREES SHALL BE GUARANTEED TO SURVIVE FOR ONE FULL YEAR AFTER INSTALLATION (FULL COST). ALL STAKES AND GUYS SHALL BE REMOVED FROM TREES AND SITE AS EARLY AS THREE (3) MONTHS, BUT NO LONGER THAN ONE (1) YEAR AFTER PLANTING. 20 24x36 20 24x36

.

1919
2018SITE DATA
18
5
SE
WER

C-EX-U-Sewer-MH-4ID

24x36

PS 22 22 1. OWNER OF RECORD: RICHARD E. PIERSON CONSTRUCTION CO. N 24x36

P.O. BOX 430

2120WOODSTOWN, N.J. 08098
19(856) 769-8244 - EMAIL: NHETRICK@REPIERSON.COM
24x36

18 2. ENGINEER / SURVEYOR: BECKER MORGAN GROUP INC. 24x36

2017309 SOUTH GOVERNORS AVE.
DOVER, DE. 19904
LANDS N/F2121W(302) 734-7950 - EMAIL: mhenry@beckermorgan.com
ERNMX-186
RICHARD E. PIERSON CONSTRUCTION CO.4"
6" S
24x36
3/3.PROPERTY MAP NUMBERS:2-05-07700-01-2803-0000124x36
T.P.: 2-05-07700-01-2803-0000122
4. PROPERTY ADDRESS: 30 LAFFERTY LANE
DEED REF.: 13381-273DOVER, DE. 19901
22
PB. REF.: 72-95 & 150-86
24x36
5. PROPERTY LOCATION: LATITUDE: N 39° 08' 50.81" GRS80 - NAD83 (2011) 24x36

LONGITUDE: W 75° 29' 31.73" GRS80 - NAD83 (2011)

29.6135 ACRES ±PROJECT TITLE
6. ZONING CLASSIFICATION: EXISTING: M - MANUFACTURING, AEOZ (APZ 1, 65 DNL A)
21PROPOSED:M - MANUFACTURING, AEOZ (APZ 1, 65 DNL A)
24x36
SET ROOT BALL 2" ABOVE
GRADE. REMOVE EXCESS
CANVAS WEBBING OR
PLASTIC HORTICULTURAL21R.E. PIERSON24x36

SOIL ON TOP OF THE TAPE. DO NOT STRETCH. 21 TREE PRESERVATION & DENSITY REQUIREMENTS 24x36 BALL, JUST EXPOSING THE ROOT FLARE. 21

20
19

18
17
20
1. EXISTING WOODLAND AREA : 0 S.F.
REGIONAL HQ 24x36

20

PROPOSED GARAGE2.WOODLANDS TO BE CLEARED :0 S.F.
9,900 S.F.
21 F.F. EL.: 22.50'
24x3622223.TOTAL WOODLANDS REMAINING :0 S.F.24x36
52223
214.TOTAL NON-WOODLAND AREA :230,184 S.F.
MULCH - PLACE 3"2"x2" WOODENTG2422
LAYER OF SPECIFIEDSTAKES. DRIVE202523
245.DENSITY : 1 TREE PER 3,000 S.F. OF LOT AREA
MULCH. DO NOT PLACESECURELY INTO2524
24x36
2424x36
IN CONTACT WITH TREEGROUND. 3 PER230,184 / 3,000 S.F. / TREE = 76.7277 TREES REQUIRED
2323
TRUNK. KEEP MULCHTREE.22
21226.EXISTING TREES TO BE RETAINED :0 TREES
WEEDED AND REPLACE
AS NEEDED.FINISHED2021
24x36

GRADE 7. PROPOSED TREES : 77 TREES 24x36

22

20208.TOTAL TREES :77 TREES
30 LAFFERTY LANE
24x36
CITY OF DOVER24x36
DELAWARE LANDSCAPE ARCHITECTS CERTIFICATIONKENT COUNTY, DE
1719SHEET TITLE
24x36
I, CHAD D. CARTER, RLA, ASLA, HEREBY CERTIFY THAT I AM A
24x36
REMOVE TOP 1/3 OF BURLAP.SOIL MIXTURE - CONSISTING OF1820LANDSCAPE ARCHITECT IN THE STATE OF DELAWARE, THAT THE
CUT & REMOVE ALL STRAPPING,
ROPES, AND WIRE CAGES.
1/4 HUMUS AND 3/4 TOPSOIL
20212021
LANDSCAPING INFORMATION SHOWN HEREON HAS BEEN PREPARED
UNDER MY SUPERVISION AND TO MY BEST KNOWLEDGE AND BELIEF,
LANDSCAPE PLAN
24x36

UNDISTURBED SOIL

REPRESENTS GOOD LANDSCAPING PRACTICES.
. 24x36

20

EVERGREEN TREE PLANTING DETAIL 5 .
PA
24x36

NO SCALEBMG NO. : L-02
2020
19.24x36
NOTE:20
DO NOT HEAVILY PRUNE THE TREE
ERNMX-18620
2019
20
24x36
AT PLANTING. PRUNE ONLY19191824x36
20CHAD D. CARTER, RLA, ASLAS1-499DATE
CROSSOVER LIMBS, CO-DOMINANT18
LEADERS, AND BROKEN OR DEAD2019
BRANCHES. SOME INTERIOR5
520
ERNMX-186ERNMX-186
24x36
TWIGS AND LATERAL BRANCHESPS524x36
MAY BE PRUNED; HOWEVER, DOTG20
PA
NOT REMOVE THE TERMINAL BUDS200153060
OF BRANCHES THAT EXTEND TO19
24x36
THE EDGE OF THE CROWN.24x36

19 19
Do Not Explode - Select Scale

19 SCALE: 1" = 30'

24x36

SET ROOT BALL 2" ABOVE 19 CANVAS WEBBING OR 24x36

GRADE. REMOVE EXCESSPLASTIC HORTICULTURALISSUE BLOCK
SOIL ON TOP OF THETAPE. DO NOT STRETCH.ERNMX-186 GROUND COVER IN
BALL, JUST EXPOSINGREMAINDER OF PROPERTY19
24x36
THE ROOT FLARE.24x36
EXTENTS19
18
19192018

17
19 18
18

24x36

MULCH - PLACE 3"2"x2" WOODEN18
1824x36

18

LAYER OF SPECIFIED STAKES. DRIVE 18

MULCH. DO NOT PLACE SECURELY INTO 18

IN CONTACT WITH TREE GROUND. 3 PER 20
19
PLANT LIST
18

24x36
TRUNK. KEEP MULCH TREE. 20 19 24x36

WEEDED AND REPLACE AS NEEDED.

KEYQUANTITYBOTANICAL NAMECOMMON NAMESIZEROOTREMARKS
FINISHED19
GRADECANOPY TREES.
21...
24x36
211724x36

19

NS8NYSSA SYLVATICABLACK TUPELO2" CALB&BFHV18MARKDATEDESCRIPTION
1920LAYER STATE: L-101
EVERGREEN TREES
20
PA15PICEA ABIESNORWAY SPRUCE5' - 6' HGTB&BFHV18
SE
WER

C-EX-U-Sewer-MH-4ID

PROJECT NO.:2025302.00
24x36
191924x36
PS15PINUS STROBUSEASTERN WHITE PINE5' - 6' HGTB&BFHV18DATE:12-5-25
REMOVE TOP 1/3 OF BURLAP.20
2018
CUT & REMOVE ALL STRAPPING,SOIL MIXTURE - CONSISTING OFTG20THUJA 'GREEN GIANT'GREEN GIANT ARBORVITAE5' - 6' HGTB&B21 FHV
19
SCALE:1" = 30'

20' B.R.L.

ROPES, AND WIRE CAGES.1/4 HUMUS AND 3/4 TOPSOIL22
UNDERSTORY TREES
DRAWN BY: A.J.D. PROJ. MGR.: M.J.H.
24x3624x36

23

UNDISTURBED SOILCF2CORNUS FLORIDAWHITE FLOWERING DOGWOOD1 1/2" CALB&BFHV
SHEET
19CR17CORNUS RUBRUMPINK FLOWERING DOGWOOD1 1/2" CALB&BFHV
23
DECIDUOUS TREE PLANTING DETAIL22
24x36

NO SCALE BMG NO. : L-01

TOTAL: 8 CANOPY TREES, 50 EVERGREEN TREES, 19 UNDERSTORY TREES
19
20
21
L-101
COPYRIGHT 2025
24x36

106 F:\Projects\2025\202530200\10_Civil\DWG\2025302-LSCAPE-C3D21-DE.dwg, Dec 04, 2025 - 9:08am

.PDF

24x36 24x36

2025-12-04

Página 107

24x36 24x36

Item 4.

24x36 24x36

I

24x36 24x36

-4I -EX- -S -

24x36 24x36

24x36 24x36

I

I

I

24x36 24x36

-EX- -S - -4I

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36

FRONT (STREET) VIEW BACK VIEW 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

I

24x36 24x36

24x36 24x36

PROJECT TITLE

24x36

R.E. PIERSON 24x36

24x36
REGIONAL HQ 24x36

24x36
RIGHT SIDE VIEW 30 LAFFERTY LANE
CITY OF DOVER
KENT COUNTY, DE
24x36

24x36 24x36

24x36 24x36

24x36 24x36

SHEET TITLE

24x36 24x36

24x36 .Office 24x36

.Architectural
24x36

.Rendering 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

ISSUE BLOCK

24x36 24x36

24x36 24x36

24x36 24x36

24x36 LEFT SIDE VIEW . MARK . DATE . . DESCRIPTION 24x36

LAYER STATE: CONCEPT

PROJECT NO.:

24x36 24x36

DATE:

Wall Material: Roof Material: SCALE:
24x36

  • •Insulated Metal Wall Panels - Standing Seam DRAWN BY: PROJ. MGR.: 24x36

SHEET

  • •4 FT tall Wainscoting around perimeter 24x36

20
CONCEPT 24x36

107

.PDF

24x36 24x36

2025-10-21

Página 108

24x36 24x36

Item 4.

24x36 24x36

I

24x36 24x36

-4I -EX- -S -

24x36 24x36

24x36 24x36

I

I

I

24x36 24x36

-EX- -S - -4I

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36
FRONT (STREET) VIEW 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

I

24x36 24x36

24x36 24x36

PROJECT TITLE

24x36

R.E. PIERSON 24x36

24x36
REGIONAL HQ 24x36

30 LAFFERTY LANE

24x36
CITY OF DOVER 24x36

KENT COUNTY, DE

24x36 24x36

24x36 24x36

24x36 24x36

SHEET TITLE

24x36 24x36

24x36 .Shop 24x36

.Architectural
24x36

.Rendering 24x36

24x36 24x36

24x36 24x36

24x36
BACK VIEW 24x36

24x36 24x36

ISSUE BLOCK

24x36 24x36

24x36 24x36

24x36 24x36

.
. . .

Wall Material:
24x36 24x36

Roof Material: MARK DATE
LAYER STATE: CONCEPT
DESCRIPTION

PROJECT NO.:

24x36

  • •Insulated Metal Wall Panels - Standing Seam DATE: 24x36
  • •4 FT tall Wainscoting around perimeter SCALE: DRAWN BY: PROJ. MGR.: 24x36 24x36

SHEET

24x36

20
CONCEPT 24x36

108

.PDF

24x36 24x36

2025-10-21

Página 109

24x36 24x36

Item 4.

24x36 24x36

I

24x36 24x36

-4I -EX- -S -

24x36 24x36

24x36 24x36

I

I

I

24x36 24x36

-EX- -S - -4I

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36
LEFT SIDE VIEW 24x36

24x36 24x36

24x36 24x36

I

24x36 24x36

24x36 24x36

PROJECT TITLE

24x36

R.E. PIERSON 24x36

24x36
REGIONAL HQ 24x36

30 LAFFERTY LANE

24x36
CITY OF DOVER 24x36

KENT COUNTY, DE

24x36 24x36

24x36 24x36

24x36 24x36

SHEET TITLE

24x36 24x36

24x36 .Shop 24x36

.Architectural
24x36

.Rendering 24x36

24x36 24x36

24x36 24x36

24x36 24x36

24x36 24x36

ISSUE BLOCK

24x36 RIGHT SIDE VIEW 24x36

24x36 24x36

24x36 24x36

.
. . .

Wall Material:
24x36 24x36

Roof Material: MARK DATE
LAYER STATE: CONCEPT
DESCRIPTION

PROJECT NO.:

24x36

  • •Insulated Metal Wall Panels - Standing Seam DATE: 24x36
  • •4 FT tall Wainscoting around perimeter SCALE: DRAWN BY: PROJ. MGR.: 24x36 24x36

SHEET

24x36

20
CONCEPT 24x36

109

.PDF

24x36 24x36

2025-10-21

Página 110

Item 5.

City of Dover
DATA SHEET FOR SITE PLAN REVIEW

DEVELOPMENT ADVISORY COMMITTEE MEETING OF January 7, 2026

PLANNING COMMISSION MEETING OF January 20, 2026

Plan Title: The Enclave Apartments (Revised Walker Road Apartments) on Walker Road, Dover, DE S-26-03

Plan Type: Site Development Plan

Location: North side of Walker Road; Northeast of the intersection of Kenton Road and Walker Road in Dover, DE between Harmony Road and the Liberty Court Apartments and north of 1325 Walker Road.

Owner: Dover Synergy Group, LLC

Addresses: Walker Road, Dover DE 19904 (unaddressed)

Tax Parcel: ED05-067.18-01-71.00-000

Size: 6.08 +/- acres

Present Uses: Woodland Forested areas/Undeveloped

Proposed Use: Apartment Complex – 48 Units

Zoning: RM-2 (Medium Density Residence Zone)

Parking: 115 total vehicle parking spaces: 106 standard parking spaces, 9 ADA parking spaces, and 16 bicycle spaces (2 racks)

For Consideration: Active Recreation Area Plan
Recreation Area: Required: 10,000 SF
Provided: 10,900 SF

Waiver Requested: Partial Elimination of Curbing

  • P.O. Box 475 Dover, DE 19903 110 Community Excellence Through Quality Service

Página 111

Item 5.

CITY OF DOVER

City of
DEVELOPMENT ADVISORY COMMITTEE Dover
Planning
APPLICATION REVIEW COMMENTARY Office

D.A.C. MEETING DATE: January 7, 2026

APPLICATION: The Enclave Apartments, Review of a Site Development Plan at Walker Road

FILE #: S-26-03 REVIEWING AGENCY: City of Dover Planning

CONTACT PERSON: Dawn Melson-Williams, AICP PHONE: 302-736-7196

Note: This Review Report was initially prepared by Staff of the Rossi Group (under a Planning Services contract with the City of Dover). The Report was completed with additional review and editing by the City’s Planning Office.

  • I.PLAN SUMMARY

This Application is for Review of a Site Development Application for the construction of two (2) three story, garden style apartment buildings consisting of twenty-four (24) units each for a total of 48 units. Also proposed are a Clubhouse, parking lot improvements, and four (4) outdoor recreation areas. The property is zoned RM-2 (Medium Density Residence Zone). The subject site consists of one parcel totaling 6.08 acres +/- located on the north side of Walker Road and west of Independence Boulevard. The owner of record is Dover Synergy Group, LLC. Property Address: unaddressed parcel on Walker Road. Tax Parcel: ED-05-067.18-01-71.00-000. Council District 4.

Preliminary Land Use Services Review (PLUS): The PLUS Review is required by a City of Dover Memorandum of Understanding (MOU) for certain types of projects. As the proposed number of dwelling units is less than 125 units, this project was not required to complete PLUS Review process.

II. PROJECT DESCRIPTION

The application proposes construction of an apartment complex in the City of Dover. The property is located northeast of the intersection of Kenton Road and Walker Road in Dover, DE between Harmony Road and the Liberty Court Apartments and north of the property at 1325 Walker Road. The 6.08-acre complex would include: two 3-story apartment buildings (24 units each/10,350 SF per floor), a Leasing office/Clubhouse, active recreation amenities, a 600 SF storage building, and associated parking lot. The proposed site’s access will connect to Walker Road between 1325 Walker Road and 1341 Walker Road.

The property has an adjacent stormwater pond facility in the southeast corner and an existing drainage ditch runs north from the pond. The subject parcel is currently forested and undeveloped. According to the National Wetlands Inventory-Wetlands Mapper, two wetland areas are located on the eastern side of the parcel: a 0.51-acre riverine that runs vertically through the length of the parcel and a 0.36-acre stormwater management pond located in the southeast corner of the property 111

Página 112

Item 5.
S-26-03 The Enclave Apartments
DAC Report of January 7, 2026

(currently identified as a 0.82-acre DelDOT stormwater pond). It must be clarified if the stormwater facility is on a separate parcel as our mapping does not show this.

Surrounding Land Uses The subject property is located near the intersection of Walker Road and Harmony Lane. The site is bordered by residential housing to the east, west, and south and a social organization office/hall to the north. The parcel is zoned RM-2 (Medium Density Residence Zone). Properties immediately adjacent to the subject project location along the south and east side are also zoned RM-2. The homes to the west are zoned RG-2 (General Residence Zone) with a portion closest to the parcel zoned as ROS (Recreational and Open Space Zone) containing picnic tables and recreational spaces associated with the neighboring townhouse development. The facility to the north of the parcel is zoned IO (Institutional/Office Zone). The proposed Enclave Apartments will be located directly between Village at McKee Branch on the west side (S-13-18 Redevelopment of Walker Woods) and Liberty Court Apartments on the east side (S-16-22 Redevelopment of Liberty Court Apartments) on Walker Road and The Most Worshipful Prince Hall Grand Lodge (north side) on College Road. Four single-family properties (1353, 1335. 1341, and 1325 Walker Road) abut the parcel along the frontage of Walker Road and are also zoned RM-2.

Previous Applications A prior Site Plan application for this site, S-23-22 Walker Road Apartments, was reviewed by the Planning Commission in December 2023. This Site Plan proposed 48 garden-style apartments in two buildings but included a layout where the buildings were in the center of the site, with the parking and drive aisles surrounding them. This plan has since expired.

III. ZONING REVIEW

RM-2 (Medium Density Residence Zone) The subject property is zoned RM-2 (Medium Density Residence Zone). Article 3 §7 of the Zoning Ordinance details the permitted uses within the RM-2 (Medium Density Residence Zone). Based upon the uses permitted in this zone, the proposed use as garden apartments is permitted. Article 4, §4.8 provides the bulk standards for the RM-2 zone. The RM-2 zone has a maximum density limitation of eight dwelling units per acre.

Required Provided

Lot Area (DU) 3000 SF/ dwelling unit 5,517.6 SF/dwelling unit

Lot Area (Building) 1 acre 3.04 +/- acre

Lot Width 100 ft. >100 ft.

Lot Depth 125ft. >125 ft.

Front Yard 30 ft. Over 145 feet

Side Yard 20 ft. 39 ft. (west)

Rear Yard 30 ft. 59 ft.

112

Página 113

Item 5.
S-26-03 The Enclave Apartments
DAC Report of January 7, 2026

Building Height 3 stories / 35 ft. 3 story/24 ft 8in

Lot Coverage 60% 40.7%

IV. PARKING SUMMARY

The RM-2 (Medium Density Residence Zone) includes a minimum parking requirement from Article 6 §1 of the Zoning Ordinance which requires that parking is calculated at two (2) parking space per dwelling unit and one (1) for every two hundred (200) square feet of office space and 0.25 per dwelling unit for visitor space. Available ADA parking is calculated at 5 accessible spaces if between 101 to 150 total spaces provided in a parking facility. Based on the submitted plans of the proposed 48 apartment units (48 DU), a minimum of 115 parking spaces is required. The Plans submitted include 115 total parking spaces: 106 standard and 9 ADA parking spaces.

For building with multi-family units, the Zoning Ordinance, Article 6 §5.3 requires that the parking spaces be at least 15 feet from the wall of the building and three feet from side and rear property lines. Provide dimensions to confirm compliance.

Bicycle Parking Bicycle parking shall be provided for parking spaces at a rate of one (1) bicycle parking space for every twenty (20) parking spaces. Based on the 115 parking spaces provided, 6 bicycle spaces are required. The Plans submitted include 16 bicycle parking spaces (4 bicycle racks).

Upright Curbing: Potential Waiver Request for Partial Elimination of Curbing The upright cubing for parking lots and drive aisles is required by Article 6 Section 3.6(b) of the Zoning Ordinance. Locations and type of curbing must be clarified on the Site Plan; it appears to include curbing expect for the rear emergency access drive. A written waiver request has been submitted for consideration.

  • V.SITE CONSIDERATIONS

Site Access The site layout provides vehicle access through one entrance on Walker Road. The proposed Site Plan connects to Walker Road with a dedicated (32-foot-wide) entrance drive between the adjoining properties of 1325 Walker Road and 1341 Walker Road.

Pedestrian Site Access The Site Plan shows existing sidewalk on Walker Road along the frontage entrance area. A frontage sidewalk is required on all street frontages. A crosswalk with associated sidewalk curb ramps is proposed along the front entrance of the project. Pedestrian access into the site is provided with sidewalks on both sides of the site entrance drive. There are sidewalks at the building fronts and at the perimeter of the Parking Lot which lead to each building and clubhouse. There are sidewalks in the parking lot center islands and medians.

Rear Emergency Access According to Article 5 Section 17 of the Zoning Ordinance, an 18-foot-wide Secondary Fire Lane is required for Apartments that are 2-3 stories to serve as rear access. This is to provide access to rear building areas. The plan calls for 18-foot-wide drive aisle around the parking lot perimeter. 113

Página 114

Item 5.
S-26-03 The Enclave Apartments
DAC Report of January 7, 2026

The Fire Marshal’s Office will also evaluate these fire protection measures as related to the fire lane requirements of the applicable Fire Codes.

Lighting The Plan shows light poles along the entrance drive, throughout the parking lot, and on the basketball and volleyball courts.

Trash Collection This site will utilize private trash collection. The Zoning Ordinance requires two (2) dumpsters per property for the first 48 apartments. The applicant proposes two (2) external dumpsters: one northwest of the Walker Road driveway and the other northeast of the parking area. The enclosure must provide space for trash and recycling units.

DelDOT Stormwater Management Pond A DelDOT stormwater management pond is located at the southeast corner of the project site, fronting on Walker Road. The 0.82-acre land area is not included in the total land area for the site. The applicant has indicated that this area is owned by DelDOT via a deed. Parcel records do not show this as a separate parcel nor as road right-of-way.

VI. ACTIVE RECREATION AREA

The Zoning Ordinance, Article 5 Section 10 sets out requirements to preserve areas of open space within residential developments which are designed to provide buffer spaces between developing areas, to preserve existing natural and historic features and to establish a network of open spaces within the built environment to provide a balance between developed and undeveloped lands, wildlife habitat conservation, the preservation of scenic view corridors, and to provide residents opportunities to engage in passive recreational activities. Zoning Ordinance, Article 5 Section 10.11 notes the purpose of providing Recreation Areas.

Article 5 §10.1 Recreation areas. 10.11 Purpose. The purpose of this section is to ensure that active recreation areas are provided as an integral design element within residential developments and that such facilities are of an adequate scale in relation to the size of the residential development and which provide residents with a variety of active recreational pursuits.

This project qualifies for the “Small development” exemption which sets the Active Recreation Area rate at 150 SF per dwelling unit or a minimum of 10,000 SF of area. The applicant has shown on the submitted plan that there will be four (4) active outdoor recreation areas, and a Clubhouse with leasing offices. These areas are labeled as basketball half court, volleyball court, and active recreation area. No specific plans for the inside of the Clubhouse are provided. See the Active Recreation Area Plan Review Report for a detailed review.

VII. BUILDING ARCHITECTURE

The application proposes an apartment complex with recreation areas. The proposed 6.08-acre complex would include two 3-story apartment buildings (24 units each/10,350 SF per floor) and a 3,613 +/- SF Leasing office/Clubhouse, and a 600 SF accessory storage building, with 115 vehicle parking spaces, landscaping, and an existing stormwater management feature. The proposed apartment buildings will feature two main material palettes. The first includes brick veneer with band board, colored trim and window frames. The second includes horizontal siding for portions of the second and third stories, decorative paneled shutter windows, gable vents, and asphalt shingle 114

Página 115

Item 5.
S-26-03 The Enclave Apartments
DAC Report of January 7, 2026

roofs in varying heights and hipped and gable formats. The stairwells will have open arches facing the front entrance over the first floor. The clubhouse has similar materials but is only one story.

Signage shown on the architectural elevations or plan is not considered as part of the Site Plan review. The plan shows freestanding signage at the site entrance. A separate application for sign permits is required. All signage must comply with the requirements of Article 5 §4 Supplementary Sign Regulations. While all signage submitted has not been reviewed for compliance with Article 5, §4, please note the following: • Monument type signs are low freestanding signs that is affixed to a base that is equal to or wider than the sign itself. The height of the sign is to be measured from the finished grade to the top of the sign.

VIII. TREE PLANTING AND LANDSCAPE PLAN

Zoning Ordinance, Article 5 Section 16, lays out the requirements for tree planting and preservation. A new project is required to provide tree planting at a rate of one (1) tree per 3,000 SF of “Development Area”. Zoning Ordinance Article 5, Section 16 defines “Woodland” as follows: Woodland. An area of contiguous wooded vegetation (7,500 square feet or greater), where trees exist at a density of at least one tree with a caliper dimension of six inches or greater per 375 square feet of land and where the tree branches form a contiguous canopy. According to plans, there are 4.19 acres of existing woods, and they propose to remove 2.09 acres of these woods (49.9%) to make way for the building site. Tree Planting Requirements The Zoning Ordinance further requires tree planting at a rate of one tree per 3,000 SF of non- woodland development area. Based on the total non-woodland area for the submitted plan of 3.98 acres, 58 trees are required to be planted. The applicant has proposed to preserve trees if possible and will plant 61 new trees as part of landscape development.

IX. WETLANDS:

Wetland Area Zoning Ordinance, Article 5 §11.231 requires that site development applications appearing before the Planning Commission must include either a wetland delineation prepared by a licensed/registered soil scientist, wetlands scientist, or professional engineer in accordance with U.S. Army Corps of Engineers standards; or provide a statement from the design professional that no wetlands are present on the site. The plan does not include a wetland delineation; yet the data column indicates a 0.2089-acre wetland area within the parcel boundary.

A 100-foot buffer must be provided from the wetland, if the wetland area exceeds 0.25 acres, and from all water bodies. This can be reduced to 50 feet if a riparian buffer is established consisting of native vegetation and can be reduced to 30 feet if there is bank stabilization that utilizes native vegetation. The plan must avoid any encroachments into this buffer area, even if reduced to 30 feet. The plan, as submitted, shows a 30-foot-wide wetland buffer but does not show details about stabilization of the ditch bank nor the planting of native vegetation in support of the bank stabilization.

115

Página 116

Item 5.
S-26-03 The Enclave Apartments
DAC Report of January 7, 2026

  • X.CITY AND STATE CODE REQUIREMENTS: The subject proposal has been reviewed for code compliance, plan conformity, and completeness in accordance with the agency’s authority and area of expertise. The following items have been identified as elements which need to be addressed by the applicant:
  • 1)Upright curbing must be provided around all parking areas and circulation drives unless a waiver is granted by the City Planner. The City Planner is accepting the partial elimination of curbing as related to stormwater facility design.
  • 2)The proposed number of buildings listed in the site plan is 2. However, the total building (24.313 SF) area was calculated including the 2 apartment buildings (10,350 SF, each) and the leasing office/clubhouse (3,613 SF). Please correct values on all pages of site plans to like building footprint and total floor area by building.
  • 3)The proposed parking calculation of one space for every 200 SF of office space lists 7 Spaces. However, the 3,613 SF of Office space when subtracting the Clubhouse (-3,000 SF) would be 613 SF of office space and therefore 4 Spaces (613 SF/200 SF). Please provide the Office square footage that would account for the additional 3 spaces that were calculated. The allocation of clubhouse/leasing office space also relates to the Active Recreation Area Plan review.
  • 4)Provide a plan sheet that clearly depicts the existing conditions of the woodland and for the woodland area to be cleared and preserved.
  • 5)For building with multi-family units, the Zoning Ordinance, Article 6 §5.3 requires that the parking spaces be at least 15 feet from the wall of the building and three feet from side and rear property lines. Provide dimensions to confirm compliance.
  • 6)Provide a wetland delineation developed by a qualified professional.
  • 7)Landscape Plan (Sheet L-1)
  • a)The site plan shows a 30-foot-wide wetland buffer in accordance with Article 5 §11.222. Reduction of the required buffer width from 100 feet to 30 feet requires a buffer be established consisting of native vegetation and that bank stabilization is implemented through the planting of native species. Please include details regarding bank stabilization and native plantings within the Landscape Plan.
  • b)Article 5 §16.53 specifies that “no more than 50 percent of a lot, parcel or tract of land occupied by woodland vegetation may be cleared for any purpose.” The plan submitted proposes to clear 49.9% of woodland on the parcel. The Landscape Plan must include a Tree Preservation and Selective Clearing Plan, in accordance with Article 5 §16.51. This plan must include tree protection measures in accordance with Article 5 §16.7.
  • 8)Please ensure that internal circulation is ADA accessible. The plan does not identify curb ramp locations or provide details for curb ramps. Please add curb ramps at each transition to the parking drive aisles and provide details on a detail sheet.
  • 9)Please provide a detail sheet that includes such features as signs, curb ramps, bicycle racks, dumpster enclosures, and other site features.
  • a)Ensure the Dumpsters as accessible as they appear to be side loading. 116

Página 117

Item 5.
S-26-03 The Enclave Apartments
DAC Report of January 7, 2026

  • b)Dumpster enclosures must provide space for trash and recycling units.
  • 10)The architectural elevations include signage. Signage is not approved as part of the Site Development Plan review and must be applied for through separate sign permits.
  • 11)Provide construction details for the following items but not limited to, dumpster enclosure, traffic control signage, lighting fixtures, bicycle racks, handicap signage, etc.
  • a)The location of the bike racks is recommended to be directly adjacent to a paved/sidewalk area but off set so as to not impede passage.
  • 12)Setbacks: The applicant should be aware that the sport courts require a setback of 30 feet per Zoning Ordinance, Article 5 Section 10.156. The recreational courts may need to be moved back to comply with the Zoning Ordinance.
  • 13)The construction of the site entrances and street improvements on Walker Road must comply with the requirements of DelDOT. Identify any improvements being implemented with the Kenton Road Improvement project which affect this area.
  • 14)Provide a complete stormwater management plan for the project. Erosion & Sediment Control Plans and Stormwater Management Plans granted approval by the Kent Conservation District and Delaware Sediment and Stormwater Management regulations must reflect the Site Plan layout and design conditionally approved by the Planning Commission and be in compliance with the Zoning Ordinance and technical review requirements of other agencies.
  • 15)The Final Plan set must include notes documenting any action taken by the Planning Commission on the requested waivers and must list any additional conditions of approval.
  • 16)The addresses for the new buildings proposed on the property will need to be confirmed with the City’s GIS Division and the Tax Assessment Office. Consultation may be necessary to determine if there are numbers available for a Walker Road address for each building or if the apartment complex drive aisle must be named.

XI. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES:

In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in considering and acting upon Site Development Plans may prescribe appropriate conditions and safeguards so that the public health, safety, and welfare, the comfort and convenience of the public in general, and the residents of the immediate neighborhood in particular shall be taken into consideration. These safeguards may to the maximum extent possible further the expressed intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed in subsections 2.21 to 2.28.

  • 1)Waiver Request - Elimination of Upright Curbing: In accordance Article 6 §3.6 (b) of the City of Dover zoning standards, upright curbing requirements can be relaxed for portions of a parking area when there is a demonstrated need to convey stormwater to a proposed SWM area. As the plan proposes sheet flow drainage into onsite swales and a stormwater pond/facility, the City Planner has granted the waiver for upright curbing in these areas. 117

Página 118

Item 5.
S-26-03 The Enclave Apartments
DAC Report of January 7, 2026

  • 2)Woodland Clearing: As the estimated wooded area to be cleared (49.9%) is within the margin of the maximum clearing requirement of 50%, Planning Staff recommends identifying additional existing wooded areas for preservation to guarantee project remains under maximum threshold.
  • 3)Wetland Buffer: The easternmost Active Recreation Area is very close to the wetland buffer. Please ensure that the wetland buffer is protected from activities within the recreation area.
  • 4)Bicycle Parking: Planning Staff would encourage some bicycle parking facilities to be either covered or otherwise provided at locations interior to the Apartment Buildings.
  • 5)Electric Vehicle Charging: Planning Staff encourages this project to include the installation of Electric Vehicle Charging Stations in its parking lot. Currently, the Zoning Ordinance does not require them, but many other jurisdictions have implemented such requirements. Electric Vehicle Charging Stations formats include EV-Capable, EV-Ready, and EV-Installed. The plan labels 4 parking spaces as EV; identify format.
  • 6)DelDOT Stormwater Management Pond: Planning Staff recommends that the application work with DelDOT to submit a record plan that either separates the 0.82-acre corner of the site from the larger parcel, either as right-of-way or a separate parcel.
  • 7)Active Recreation Area Plan Review: The Active Recreation Area Plan Review report is attached. The Parks, Recreation and Community Enhancement Committee will review this at their meeting on January 13, 2026. The following staff recommendations were provided in the report:
  • a)The project plan is required to provide 10,000 SF of Active Recreation Area. The Plan shows a total of 10,900 SF of Active Recreation Area including four Active Recreation features consisting of a basketball half court, a volleyball court, and two Active Recreation areas along with a Clubhouse Building. Staff recommends approval of the proposed Active Recreation Area amenities, subject to the conditions and recommendations below.
  • b)Recreation Areas: As a residential development, there is a requirement for Active Recreation area(s). Staff recommends the following regarding these Recreation Area amenities:
  • i.Sport Courts:
  • 1.The recreation areas outlined for specific sports should indicate the materials used for court areas.
  • 2.Ensure that game courts maintain the 30-foot setback from property lines.
  • 3.Connecting these areas to the walking paths would allow for wheelchair and stroller access. ii. Clubhouse:
  • 1.There should be specifics on what recreation or activities can transpire in the Clubhouse.
  • 2.List size of areas with Clubhouse as Leasing Office area does not count. iii. Active Recreation Areas:
  • 1.Provide details for the unspecified active recreation areas as to whether they will be open lawn area or have amenities.
  • 2.Ensure the unspecified active recreation area east of the parking lot is not located 118

Página 119

Item 5.
S-26-03 The Enclave Apartments
DAC Report of January 7, 2026

within the required 30-foot buffer from the wetland boundary.

XII. ADVISORY COMMENTS TO THE APPLICANT:

  • 1)In the event, that major changes and revisions to the Site Plan occur in the finalization of the Plan contact the Department of Planning and Inspections. Examples include relocation of site components like paving and increases in building footprint. These changes may require resubmittal for review by the Development Advisory Committee, Planning Commission, or other agencies and commissions making recommendations in regard to the Plan.
  • 2)Following Planning Commission approval of the Site Plan, the Plan must be revised to meet all conditions of approval from the Development Advisory Committee or as otherwise noted. A Check Print must be submitted for review to Planning Office Staff and to the other commenting agencies. Upon determination that the Plan is complete and all agency approvals have been received, copies of the Plan may be submitted for final endorsement (Final Plan Approval).
  • 3)Other agencies and departments which participate in the Development Advisory Committee may provide additional comments related to their areas of expertise and code requirements.
  • 4)The applicant/developer shall be aware that prior to any ground disturbing activities on the site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections and permits are required.
  • 5)For building new construction, the requirements of the building code and the fire code must be complied with. Consult with the Building Inspection Staff and City of Dover Fire Marshal regarding these requirements. The resolution of these items may impact the site design including such items as building dimensions and height, building openings, and fire protection needs, etc.
  • 6)The applicant shall be aware that Site Plan approval does not represent a Building Permit and associated construction activity permits. A separate application process is required for issuance of a Building Permit from the City of Dover. Building Permits will be required for each building.
  • 7)The applicant shall be aware that Plan approval does not represent a Sign Permit, nor does it convey permission to place any sign on the premises. Any proposed site or building identification sign may require a Sign Permit from the City of Dover prior to placement of any such sign in accordance with Zoning Ordinance, Article 5 §4.
  • 8)The City of Dover has construction work hours limitations that are outlined in the Noise Ordinance in the Dover Code of Ordinances. Staff suggests planning for construction impacts such as notifying adjacent residents on Walker Road with construction schedule/hours to mitigate noise impact and maintenance efforts to clear roadways of sediment & tracking.

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Office as soon as possible.

119

Página 120

Item 5.

CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: DECEMBER 31, 2025

APPLICATION: The Enclave Apartments: Revised Walker Road Apartments FILE #: S-26-03 REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services CONTACT PHONE #: 302-736-7025 CONTACT EMAIL: jlyon@dover.de.us

T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE .

T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :

CITY AND STATE CODE REQUIREMENTS

SANITATION

  • 1.The proposed plan will require private trash collection services. A note to this effect is to be added to the plan. Dumpster locations should also be provided on the plan. STORMWATER
  • 1.Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from Kent Conservation District is submitted to our office.
  • 2.The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert elevations must be labeled on all stormwater structures.
  • 3.Please be advised that easements will not be provided for the stormwater infrastructure on this site, it shall be privately maintained. STREETS
  • 1.Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted to our office.
  • 2.The street network is to be private and will not be maintained by the City of Dover.
  • 3.Please add the following notes to the plans:
  • a.Standard City of Dover sidewalk, as per chapter 98, article IV of the Dover Code of Ordinances, shall be required to be installed along the entire public street frontage of a property. Where frontage sidewalk exists but does not meet the standards of chapter 98, article IV, the sidewalk shall be re-laid to meet the standards. Sidewalk shall include barrier-free access ramping at points of intersection with street crossings and at other locations so as to afford reasonable barrier-free pedestrian movement and site access.

120

Página 121

Item 5.
The Enclave Apartments: Revised Walker Road Apartments
File #: S-26-03
December 31, 2025

  • b.In accordance to Appendix A, Article VI, Section B.3, all sidewalks shall ascend from the curbstone to the building line at the ratio of one-quarter of an inch to the foot. Nothing in this section shall be construed to affect any pavement previously laid by order of the city council, until it is taken up and relaid.

WATER

  • 1.All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information.
  • 2.The following notes must be added to the plans:
  • a.Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project.
  • b.Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
  • c.The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736- 7025 prior to the start of construction. A representative from the City of Dover Department of Water & Wastewater must observe and approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted in the field due to conditions of the existing main. Possible conditions that would require tapping relocation include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes must be performed by the contractor to determine the best tapping location. The City of Dover will not be held responsible for field conditions requiring adjustment of the tapping location or for any work required by the contractor to make an appropriate and lawful connection.
  • 3.The size, type, and location of all proposed and existing water lines and valves must be shown on the plan. Please be advised that effective May 1, 2022, water mains can now be constructed using DR 18 PVC pipe.
  • 4.Water usage projections (peak demand or plumbing fixtures) must be submitted to our office to correctly determine the size of the domestic and irrigation (if applicable) water meter for the proposed building. These projections must be submitted prior to approval so the meter size can be placed on the final site plan. The proposed water meter must be installed in a pit per City of Dover requirements and manufacturer’s recommendations. Also, a dual check valve is required downstream of the meter.
  • 5.The domestic service, fire main connection and valves must be clearly shown for each building. A valve must be installed at the tee to isolate combined fire and domestic water service to the building from the water loop. Typically, this valve is installed at the tee or an acceptable distance from the building. A valve must be provided on the domestic water service, which must be tapped off of the combined eight-inch (8”) fire/domestic service outside of the building. The domestic water tap and valve should be as close to the building as possible. Typically, the domestic tap and valve are located within five feet (5’) to ten feet (10’) of the building. A blow up detail of this layout is recommended.
  • 6.Provide a construction detail for the proposed restraining system for the fire main located within the buildings. The Department of Public Works will test and inspect all fire mains to a blind flange located inside the buildings. The blind flange with tap is used for hydrostatic pressure testing (200 psi for two (2) hours) and dechlorination. The flange must be restrained in the direction of the pipe entering the facility. A pipe entering horizontally through a wall sleeve shall be restrained with rods through the wall. A pipe entering vertically through a slab shall be restrained through the floor to the ninety degree (90) bend and thrust block. All rods shall be a minimum of ¾” all thread. All pipes through walls and slabs must be Class 52 cement lined ductile iron pipe. Confirm particulars to meet this requirement with mechanical designer.
  • 7.Please call out that the connection to the water main shall be accomplished with a Powerseal 3490AS tapping sleeve and valve.
  • 8.Each building shall have one (1) water service.
  • 9.The water infrastructure within the development shall be privately maintained.
  • 10.On October 24, 2022, City of Dover Council approved the new Cross Connection Control Program. This program requires certain backflow prevention assemblies on water service connections to the city’s distribution system. A double check valve backflow prevention assembly will be required on each building, please note on plans. The certificate of occupancy will not be provided until the city has proof that the assembly has been installed and tested by a certified tester.

121

Página 122

Item 5.
The Enclave Apartments: Revised Walker Road Apartments
File #: S-26-03
December 31, 2025

WASTEWATER

  • 1.All wastewater utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information.
  • 2.The following notes must be added to the plans:
  • a.Any existing sanitary sewer lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
  • b.Part II, Chapter 180, Article III, Section 180-10 of the Code of Kent County requires that “no person shall discharge or cause to be discharged any stormwater, surface water, uncontaminated groundwater, roof runoff, subsurface drainage, uncontaminated noncontact cooling water or unpolluted industrial process waters to any sanitary sewer”, this shall include condensate. Sec. 110-231 of the City of Dover Code defines storm sewer as “…any system used for conveying rain water, surface water, condensate, cooling water or similar liquid wastes, exclusive of sewage.” The contractor, developer, owner and designers shall ensure during construction that no illegal discharges to the sanitary sewer system are created with the site improvements.
  • 3.The size, length, slope, type and flow directions must be shown on all existing and proposed sanitary sewer lines. Rim and invert elevations must be labeled on all sanitary structures.
  • 4.Cleanouts must be installed on sanitary sewer laterals within five feet (5’) of the building, one foot (1’) outside of the right-of-way and at all bends. Any cleanout located within a traffic bearing location shall be installed with a heavy duty cast iron frame and cover to prevent damage to the cleanout and lateral.
  • 5.Sizing (flow) calculations must be submitted for all sanitary sewer mains showing that velocity and all other requirements are met.
  • 6.The minimum size of all sanitary sewer laterals shall be six-inch (6”).
  • 7.If kitchen facilities are proposed a minimum 1,000 gallon, two chamber grease trap, meeting all Kent County ordinance requirements, must be provided. A construction detail for the proposed grease trap, as well as the proposed location, must be provided on the plan.
  • 8.The downstream pump station must be evaluated by the developer / engineer to verify it can handle the additional effluent flow. If improvements are required for the pump station, the cost shall be the responsibility of the developer.
  • 9.The wastewater infrastructure within the development will be privately maintained. GENERAL
  • 1.All existing utilities shall be adjusted to final grade in accordance with current City of Dover requirements and practices. This must be included as a note on the plan.
  • 2.No trees may be planted within ten feet (10’) of utility infrastructure.
  • 3.No structure may be installed within ten feet (10’) of utility infrastructure, please depict all underground utilities and structures on the utility plan sheet to confirm compliance.
  • 4.The final site plan must be submitted in the following compatible digital formats:
  • a.AutoCAD 2018 (.dwg format).
  • b.Adobe Reader (.pdf format).

RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES SANITATION / STORMWATER / STREETS / WATER / WASTEWATER / GENERAL 1. None.

ADVISORY COMMENTS TO THE APPLICANT 122

Página 123

Item 5.
The Enclave Apartments: Revised Walker Road Apartments
File #: S-26-03
December 31, 2025

WATER

  • 1.The City of Dover water system is available to this site. The developer is responsible for all costs associated with extending and providing service to the proposed development.
  • 2.Prior to plan approval, the water system plans must be submitted to the Division of Public Health, Office of Drinking Water for review and approval. The owner/developer will be responsible for providing all completed forms and plan sets to the City of Dover as required for submission to the Office of Drinking Water. Plans will not be submitted to the Office of Drinking Water until review has been completed by our office.
  • 3.Hydrant flow testing is currently only performed during the spring and fall. The applicant must call the Department of Water & Wastewater directly to schedule these tests. This applies to both existing hydrants as well as those proposed for the site.
  • 4.Water impact fees will be required to be paid prior to Certificate of Occupancy for this project. WASTEWATER
  • 1.The City of Dover sanitary sewer system is available to this site. The developer is responsible for all costs associated with extending and providing service and capacity to the proposed development.
  • 2.Prior to plan approval, it may be required to submit the sanitary sewer system plans to the DNREC, Division of Water Resources, Surface Water Discharges Section for review and approval. The owner/developer is responsible for providing all application fees, completed forms and plan sets directly to DNREC.
  • 3.Profiles of the sanitary sewer main must be provided with the construction plans. All water, sanitary sewer and storm sewer crossings must be shown on the profiles.
  • 4.Wastewater impact fees will be required to be paid prior to Certificate of Occupancy for this project. GENERAL
  • 1.The applicant is advised that depending upon the size of the existing water service and sanitary sewer lateral to be abandoned, flowable fill may be required.
  • 2.Construction plans will not be reviewed by our office unless all previous comments have been clearly addressed within the plan set and accordingly identified within an itemized response letter and with the Water/Wastewater Initial Plan Submission Checklist, which can be obtained from the following website: https://imageserv9.team- logic.com/mediaLibrary/198/WaterWastewaterHandbookFinal_1.pdf, page 88. SANITATION / STORMWATER / STREETS
  • 1.None.

I F Y OU H AVE A NY Q UESTIONS OR N EED TO D ISCUSS ANY OF THE A BOVE C OMMENTS , P LEASE C ALL THE A BOVE C ONTACT P ERSON AND THE P LANNING D EPARTMENT AS S OON AS P OSSIBLE .

123

Página 124

C F
S-26-03
Item 5.
I I
T R
CITY OF DOVER Y E

DEVELOPMENT ADVISORY COMMITTEE O M

F A APPLICATION REVIEW COMMENTARY R D.A.C. MEETING DATE: December 31, 2025 D S O H V A E L R APPLICATION: The Enclave Apartments Revised

FILE #: S-26-03 REVIEWING AGENCY: City of Dover, Office of the Fire Marshal

CONTACT PERSON: Jason Osika, Fire Marshal PHONE #: (302) 736-4457 josika@dover.de.us

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY, AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE.

THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESS BY THE APPLICANT:

CITY AND STATE CODE REQUIREMENTS:

  • 1.Proposed occupancy classification is apartments
  • 2.Building Access shall be no further than 50 feet from a primary entrance.

Where buildings are provided with an automatic sprinkler system installed in accordance with NFPA 13, access shall be no further than 100 feet from the primary entrance. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.4)

  • 3.Parking shall be prohibited in front of the primary entrance for a width of not less than 1.5 times the width of the door(s) or for 10 feet, whichever is greater. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.2)
  • 4.Perimeter access shall be 75% and clearly shown on the plans.

Perimeter Access minimum width shall be10 feet for one-story buildings and 15 feet for buildings of two or more stories, measured from the face of the building at grade with a maximum slope of ten percent (10%). Plantings and utility services (includes condenser units, transformers, etc.) shall be permitted within the perimeter access, and shall not interfere with emergency services fire ground operations.

If a physical barrier (fence, pond, steep slope, etc) prevents access, that portion of the building perimeter shall not be included in the calculation of Percent of Perimeter Access. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5)

Where parking is located between the building and perimeter access area, parking shall not be located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of two or more stories. 124

Página 125

Item 5.

  • 5.Fire lanes shall cover 35% (plus rear access )of the proposed building. Fire lanes are required to be 24 feet wide and run along the front of the building as determined by the primary entrance(s). In cases where there is more than one primary entrance(s), each shall be served by a fire lane even if this exceeds the percentage as required.

The closest edge of fire lanes shall not be located closer than ten (10) feet to the exterior wall and the closest edge of fire lanes shall not be located further than 50 feet from the exterior wall if one or two stories in height; 40 feet if three or four stories in height, or 30 feet if over four stories in height. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5)

  • 6.Where parking is located between the building and the fire lane, parking shall not be located closer than 15 feet to the exterior wall. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.4.1) Where parking is located between the building and the perimeter access area, parking shall not be located closer than 10 feet to the exterior wall for one-story buildings and 15 feet to the exterior wall for building of two or more stories. 2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 3.5.2
  • 7.All Fire Lanes shall be marked as follows:

both the inner and outer edges of the fire lane shall be marked, where curbs are present, the top and face of the curb shall be painted yellow, where no curbs are present, a four inch (4”) solid yellow demarcation line shall mark the edge(s) of the fire lane. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)

  • 8.The specific color yellow shall be the uniformly accepted yellow as utilized by State of Delaware Department of Transportation (DelDOT). Only vivid and durable paint shall be used and shall be suitable for street surfaces
  • 9.Fire lane signs shall be located as follows:

see Figure 5-16 – Approved Sign For Marking Fire Lanes, fire lane signs shall be spaced at 150 foot intervals maximum, all fire lane signs shall be located no less than six feet (6’) and no higher than eight feet (8’) above the pavement, signs shall be placed at each end of the fire lane, and signs shall face all oncoming traffic.

Where parking is not restricted roadway markings shall utilize the words "FIRE" and "LANE" in lieu of fire lane signs and shall conform to the specifications of 7.6. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 7)

  • 10.Where overhangs, canopies, balconies, or any other building or site features must project over any fire lane, an unobstructed vertical clearance of not less than 13’-6” above the fire lane shall be provided and the portion of the building perimeter which contains overhangs, canopies, balconies, or any other building features shall not apply towards the fire lane accessibility requirements of Section 4.0, Table 5-1 in this chapter. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.8)
  • 11.All access roadways shall be paved and be a minimum of 20 feet clear width for two-way traffic and 14 feet clear width for one-way traffic. The paved width of access roadway shall be measured from edge of parking spaces, or face of curb for vertical curb and back of curb for mountable curb, or edge of pavement if there is no curbing.(2021 Delaware State Fire Prevention Regulations, 705, Chapter 5, 5.2)

125

Página 126

Item 5.

  • 12.Emergency access to rear building areas compliant with City of Dover Code (Appendix B- Zoning, Article 5- Supplementary Regulations, Section 17);

all four stories and greater buildings require 24ft fire lane at the rear.

All two to three story apartment structures require an 18ft Secondary Fire Lane at the rear.

All townhouses (3-8 units with no fire protection) require a 16ft alley or 18ft secondary fire lane at the rear.

  • 13.Multiple Access Roads shall be provided when a fire department access road (fire lane) is determined by the Fire Marshal to be impaired by vehicle congestion, condition of terrain, climatic conditions, or other factors that could limit access such as placement of fire hose from fire equipment.
  • 14.Street width shall be in accordance with City of Dover Code of Ordinances, Appendix A, Article VII, Section A. 13,

Residential areas
24 feet wide with no parking,
30 feet wide with parking on one side, or
36 feet wide with parking on both sides

Commercial areas
26 feet wide with no parking,
32 feet wide with parking on one side, or
38 feet wide with parking on both sides

Alley
12 feet wide

  • 15.Speed Reduction Devices must be approved, please see City of Dover Ordinance Chapter 98-10 in reference to this process.
  • 16.Fire hydrants shall be installed per the requirements of City of Dover Public Utilities Water/Wastewater Handbook, NFPA requirements, and Delaware State Fire Prevention Regulations. City Ordinance Sec 46-9 (f). 5.1.1 Hydrant spacing as shown in the Fire Flow Tables shall be used as a general rule. Hydrants shall be located at the direction of the State Fire Marshal so as to minimize friction in fire hose. All hydrant spacing shall be located along available roads or at the direction of the State Fire Marshal. This measurement shall be calculated by way of accessible thoroughfare(s) from the building to be protected to the hydrant and may not necessarily be a radius. 5.1.3 Additional hydrants shall be provided when the State Fire Marshal deems it necessary based on the configuration of the site, building(s), exposures, construction, occupancy, and/or specific hazard(s). Fire Flow table 2, hydrant spacing shall be 800 feet on center for one and two family detached dwellings, other residential, rowhouses and townhouses, assembly, health care, business, education, storage, industrial, mercantile, and mini storage. (702, Chapter 6)

NFPA 1

126

Página 127

Item 5.

18.5.2 detached one- and two-family dwellings, fire hydrants shall be provided for detached one- and two-family dwellings in accordance with both of the following: 1. the maximum distance to a fire hydrant from the closest point on the building shall not exceed 600 feet 2. the maximum distance between fire hydrants shall not exceed 800 feet.

18.5.3 buildings other than detached one- and two-family dwellings, fire hydrants shall be provided for buildings other than detached one- and two-family dwellings in accordance with both of the following 1. The maximum distance to a fire hydrant from the closet point on the building shall not exceed 400 feet 2. The maximum distance between fire hydrants shall not exceed 500 feet

  • 17.All fire hydrants shall be marked as prescribed within the appropriate section of this regulation and as illustrated by the appropriate figures of this regulation.

All fire hydrants shall have minimum of four-inch (4") solid yellow demarcation lines to define specific areas, where fire hydrants are located along a curb line with permitted parking, the area between the fire hydrant and the street or fire lane shall be stenciled with four inch (4") demarcation lines and the words "NO PARKING", demarcation lines shall be measured from the center line of the fire hydrant and extend for a distance 15 feet on both sides.

Where fire hydrants are located in parking lots or other areas susceptible to blockage by parked vehicles they shall be treated as follows: fire hydrants shall be protected in all directions for a distance of seven feet (7') with barriers or curbing, Minimum four-inch (4") diameter steel bollards filled with concrete and marked yellow shall be installed at the outermost corners of the fire hydrant demarcation area. The minimum height of the bollard shall be 36 inches above the finished grade of the adjacent surface, and the steamer connection of all fire hydrants shall be positioned so as to be facing the edge of the street, or traffic lane. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 2) The owner is responsible if the hydrant is private.

  • 18.Hydrant barrels shall be provided with reflective material, such as paint, durable for highway/roadway markings or a reflective tape of a minimum of 2” in width around the barrel under the top flange, hydrant bonnets shall be color coded based on the following criteria: class AA 1500 GPM - painted light blue, class A 1,000 GPM -1499 GPM - painted green, class B 500 - 999 GPM - painted orange, class C 250 - 499 GPM - painted red, class D under 250 GPM - painted black. (2021 Delaware State Fire Prevention Regulations 703, Chapter 3. 4) The owner is responsible if the hydrant is private.
  • 19.Hydrants are to be Darling Co. B-62-B Breakaway https://american-usa.com/products/valves-and- hydrants/fire-hydrants/5-1-4-american-darling-b-62-b-5
  • 20.NFPA 72 compliant Fire Alarm System required per occupancy code requirements.

Fire alarm in place of assembly. Fire alarm required. Any new occupancy or new portion of an occupancy determined to be a place of assembly by the fire marshal and is capable of receiving an occupant load of 75 persons or greater, shall be required to install a fire alarm in accordance with NFPA codes governing the installation of fire alarms and the National Electrical Code.

Fire alarm system required. Any existing occupancy or portion of an existing occupancy determined to be a place of assembly by the fire marshal, and is undergoing renovations in excess of 50 percent of the assessed value of the building and is capable of receiving an occupant load 75 persons or greater or is being enlarged to receive an occupant load of 75 persons or greater, shall 127

Página 128

Item 5.

be required to install a complete fire alarm system in accordance with NFPA codes governing the installation of fire alarms and the National Electrical Code.

Public mode audible requirements. To ensure that audible public mode signals are clearly heard by occupants of a structure, they shall have a sound level at least 15 decibels (dB) above the average ambient sound level or five decibels (dB) above the maximum sound level having a duration of at least 60 seconds, whichever is greater, measured five feet (1.5m) above the floor in the area required to be served by the system using the A-weighted scale dBA. In the event the stated requirement cannot be met a shunt trip relay/switches shall be the approved method of meeting the intent of this section of the Code. (City Code of Ordinances 46-171)

  • 21.Sprinkler system required. System is to be monitored by an approved Fire Alarm System.

This chapter shall apply to all buildings, structures, marine vessels, premises, and conditions which are modified by more than 50% after the effective date of these Regulations. The 50% figure shall be calculated utilizing the gross square footage of the building, structure, marine vessel, premises and conditions as to arrive at the correct application.

Any proposal that is presented to the Office of the State Fire Marshal for review and approval for a building rehabilitation as defined in the 101 Life Safety Code, for less than 50% of the gross square footage of a non-sprinklered building, may not have another such project for the same building submitted for review and approval any sooner than three (3) years after the date of the final inspection unless sprinkler projection is provided throughout the entire building.

In all buildings exceeding 10,000 square feet of aggregate, gross floor area.

In all buildings in excess of 40 feet in height or more than four (4) stories in height.

In all buildings or areas thereof used for the storage, fabricating, assembling, manufacturing, processing, display or sale of combustible goods, wares, merchandise, products, or materials when more than two (2) stories or 25 feet in height.

In all basement areas exceeding 2,500 square feet floor area.

In residential occupancies when of: Type V (0,0,0) or Type III (2,0,0) construction and exceeding two (2) stories or 25 feet in height. Type V (1,1,1) and Type III (2,1,1) or

Type IV (2,H,H) construction exceeding three (3) stories or 3In all residential apartment buildings storage areas except individual unit closets that are located within individual residential living units.

In all buildings used as health care occupancies as defined in the Life Safety Code, NFPA 101, as adopted and/or modified by these Regulations. In all buildings or areas classified as "high hazard" under the Life Safety Code, NFPA 101, or "extra hazard" under the Standard for the Installation of Sprinkler Systems, NFPA 13, as adopted and/or modified by these Regulations.

128

Página 129

Item 5.

All buildings used as dormitories, in whole or in part, to house students at a public or private school or public or private institution of higher education. (16 Del.C. Ch. 88) This applies to all such dormitories regardless if new or existing.

(2015 State of Delaware fire Prevention Regulations, 702, Chapter 4)

Places of assembly shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13 when the following apply:

All new indoor places of assembly with an occupant load of 150 persons or greater.

Any interior renovations of 50 percent or more to an existing place of assembly with an occupant load greater than 150 persons.

Any additions or increase in interior size to an existing place of assembly that would create an occupant load of 150 persons or greater.

Places of assembly where alcohol is served for consumption on the premises shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13 when the following apply:

All new indoor places of assembly with an occupant load of 100 persons or greater and where alcohol will be served for consumption on the premises.

Any interior renovation of 50 percent or more to an existing place of assembly with an occupant load greater than 100 persons and where alcohol will be served for consumption on the premises.

Any additions or increase in interior size to an existing place of assembly which would create an occupant load of 100 persons or greater and where alcohol will be served for consumption on the premises.

New educational occupancies of 5,000 square feet or greater shall be sprinklered throughout in accordance with the most recently adopted edition of NFPA 13. (City of Dover Code of Ordinances 46-162)

NFPA 101, 12.3.5.1 The following assembly occupancies shall be protected throughout by an approved, supervised automatic sprinkler system in accordance with 9.7.1.1(1): 1. Dance Halls 2. Discotheques 3. Nightclubs 4. Bars 5. Restaurants 6. Assembly occupancies with festival seating

  • 22.Fire Department Connection is to be a 5-inch stortz connection on a 30-degree elbow located within 50 feet of main entrance. Access to the Fire Department Connection must be clear unobstructed access as defined by the AHJ.

129

Página 130

Item 5.

Fire department connections. Unless otherwise approved by the fire marshal, fire department connections shall be on the street side of the building and shall be located and arranged so that hose lines can be readily and conveniently attached to without interference from any nearby obstructions as defined by the fire marshal's office. Fire department connections shall be a five- inch Storz. Fire department connections shall be within 300 feet of an approved City of Dover Fire Hydrant and within 50 feet of the main entrance of the structure it serves. All fire department connections shall be not less than three feet nor more than five feet in height above finished grade. The fire marshal shall have the authority to require more stringent requirements when deemed necessary. (City of Dover Code of Ordinances 46-162)

  • 23.Parking and/or obstructions shall be prohibited in front of fire department connections for a distance measuring from the center line and extending four feet on both sides. (2015 Delaware State Fire Prevention Regulations, 705, Chapter 5, 6.3.4)
  • 24.Fire Department Connection to be located within 300 feet of fire hydrant, measured as hose would come off the fire equipment.
  • 25.All standpipe and sprinkler connections shall be marked as prescribed within the appropriate section of this regulation and as illustrated by the appropriate figures of this regulation. All standpipe and sprinkler connections shall have minimum of four inch (4") solid yellow demarcation lines to define specific areas, Solid yellow demarcation lines shall be measured from the center line of the connection and extend for a distance of four feet (4') on both sides, and where parking is allow between the building and the street or fire lane the solid yellow demarcation lines shall extend from the end of the sidewalk surface to the street or fire lane (Markings shall not be required on the sidewalk surface).

All fire department connections (standpipe and sprinkler) shall have a minimum 12" x 18" sign that reads FIRE DEPT. CONNECTION, sign lettering shall be a minimum of 3 inches (3") in height with red scotchlite letters on white scotchlite background. The sign shall be clearly visible from the fire lane or roadway, and signs using NFPA international symbols shall be an acceptable alternative. (2021 Delaware State Fire Prevention Regulations, 705, Chapter 6, 3)

  • 26.Standpipes shall be provided in all areas and buildings as required in the codes and standards listed in Regulation 701 as well as the following areas or buildings:

In all Class A and Class B places of assembly and institutional occupancies two (2) stories or 25 feet in height or over,

In any building over three (3) stories, In any building over 35 feet in height,

In any building that has a floor above the first floor over 10,000 square feet gross floor area,

In all buildings where the 1st floor exceeds 60,000 gross square feet,

a Class I horizontal standpipe system installed in accordance with the applicable codes and standards listed in Regulation 701 of these Regulations shall be provided. All standpipe systems shall be installed in accordance with the applicable codes and standards listed in Regulation 701.

The standpipe system shall be carried up with each floor and shall be installed and ready for use as each floor progresses.

Standpipes shall not be more than one floor below the highest forms of staging,

130

Página 131

Item 5.

The 2½-inch of hose connections on Class I systems shall be provided in the following locations, At the highest intermediate landing between floor levels in every required exit stairway,

Where intermediate landing is not provided, hose connections shall be permitted to be located at the main floor landings in exit stairways when approved by the authority having jurisdiction, Where the local fire department has the capability of providing the required pressure, hydraulically designed standpipe systems in fully sprinklered, non-high-rise buildings shall be designed to provide the required waterflow rate.

A sign shall be provided at each landing, in all interior stairways, designating the floor level. (2021 Delaware State Fire Prevention Regulations 702, Chapter 4, 2)

  • 27.The installation of natural gas and LP gas meters, regulators, valves, and LP gas bottles shall be protected from impact damage by impact protection. Natural gas and LP gas meters, regulators, and valves located inside structures shall have impact protection, except when located in separate protected utility rooms.

Dimensions of bollards. Bollards shall be a minimum of six-inch diameter filled with concrete. The bollard shall be set into the ground at a depth of at least 36 inches (three ft.) embedded in concrete at a minimum of 18 inches surrounding the bollard. The bollards must be a least 48 inches (four ft.) in height above the finish grade elevation. Any deviation of the stated requirements must be approved by the fire marshal and/or chief building inspector. The above dimensions shall serve as the requirement for installation; however, the fire marshal and/or chief building inspector shall have the authority to require more stringent dimensions to fit the needs of devices warranting impact protection.

Color of bollards. Bollards should be of the following colors; yellow, amber or orange. All colors shall be of fluorescent or have a reflective coating. Any deviation of the stated requirements must be approved by the fire marshal and/chief building inspector. (City of Dover Code of Ordinances, 46-4)

  • 28.Every house, building or structure used or intended for use as living quarters or as a place for conducting business, and having any wall facing or abutting any public or private street or alley, shall have displayed on that wall, in legible, easily read characters which are of contrasting color to the background, the proper street number for such house, building, or structure in accordance with the following:

One-family and two-family residential structures, height, the number shall measure a minimum of four inches in height, location, the number shall be placed on the house above or to the left or right of the front entrance, color, the number shall be contrasting to the background color, Arabic numerals, all numbers shall be Arabic numerals.

Multiple-family dwellings, measurements, the number shall measure a minimum of six inches when identifying individual apartments with exterior doors, and 12 inches when identifying buildings with apartment complexes where there are two or more buildings not assigned street addresses. Individual buildings with street addresses shall have numbers measuring six inches, location, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot, color, numbers shall be contrasting to the background color, Arabic numerals, all numbers used shall be Arabic numerals.

131

Página 132

Item 5.

Commercial, industrial and office buildings, height, the numbers shall measure a minimum of 12 inches in height, location generally, numbers shall be placed either in the center of the building or on the street end of the building so as to be visible from either the public or private street or from the parking lot,

property line or driveway, should the building be located far enough from a public or private road so that the numbers are not clearly visible from the street, then the street address shall also be posted on the property at or near the property line or driveway to said building,

color; each building, numbers shall be contrasting to the background color and shall be placed on each building in the complex,

Arabic numerals, all numbers used shall be Arabic numerals,

Shopping centers. Shopping centers consisting of two or more stores shall have a tenant or suite number affixed to the front of the tenant space and on the outside of the rear door which corresponds with that tenant space. Numbers shall measure six inches in height. (City of Dover Code of Ordinances, 98-344)

  • 29.A lock box (Knox) containing any and all means necessary for fire department access shall be provided at the following occupancies: any occupancy that contains a fire alarm signaling system that is monitored off-site, or any occupancy that contains an automatic sprinkler system. (2021 Delaware State Fire Prevention Regulations 705, Chapter 5, 2.4)

Secured key systems. When required; exemption. A secured key system shall be required for any new or existing building where a fire alarm or sprinkler system is being installed. It shall be the responsibility of the owner or occupant to keep a set of keys in the secured key box that are current to the locks of the protected occupancy. Buildings with 24-hour staffing or guard service shall be exempt from this subsection.

Location. The secured key system shall be located as close to the main entrance as possible. Should the building design not allow the secured key system to be located by the main entrance, the fire marshal and fire chief shall come to an agreement as to an alternate location for the key box. A secured key system, once installed, shall not be obstructed from view or obstructed by any means that would delay the fire department access to the box.

Required keys. Keys to be secured in the key box shall include keys to all points of ingress or egress, whether on the interior or exterior of the building, and keys to locked mechanical rooms, electrical rooms, elevator rooms, fire alarm and sprinkler controls and any area protected by automatic fire detection. Keys to individual residential apartment units are not required.

Ordering responsibility. It shall be the responsibility of the general contractor to order the key box for new buildings. It shall be the responsibility of the owner or tenant to order the key box for existing buildings.

132

Página 133

Item 5.

Installation before testing. No acceptance test for sprinklers or fire alarms shall be conducted before the installation of a key box. (City Code of Ordinances 46-127)

Knox Box to be mounted 6 feet above ground level

  • 30.All required means of egress shall have an exit discharge consisting of a non-slip surface and leading to and terminating at a public way. NFPA 101
  • 31.All new passenger elevators in a building shall be provided with a car sized to accommodate an ambulance cot 24 inches (609 mm) by 84 inches (2133 mm) in its horizontal open position. Where two or more new passenger elevators are located in a single hoist way and serve all or the same portion of the building, only one elevator car that provides a car sized to accommodate an ambulance cot 24 inches by 84 inches in its horizontal position for each hoist way shall be required. Elevator cars required to comply with 15.1 or 15.2 shall be identified by the international symbol for emergency medical services (star of life). The symbol shall be not less than 3 inches (76 mm) in height and shall be placed inside on both sides of the hoist way door frame. Firefighter recall keys shall be provided in a manner acceptable to the local fire department. (2021 Delaware State Fire Prevention Regulations 705, Chapter 1, 15)
  • 32.Buildings over 25,000 Sq. Ft are to have radio performance testing done prior to Final CO. This must be scheduled in advance with an authorized vendor.
  • 33.Project to be completed per approved Site Plan.
  • 34.Full building and fire plan review is required.
  • 35.Separate building permits/plans submission will be required for each building and/or tenant fit out. If the permit submission is for a “shell” a Certificate of Occupancy will not be issued. Separate plans and permits submissions will be required for each “tenant fit out” at which time a Certificate of Occupancy will be issued upon compliance/completion of each “tenant fit out”.

Each “shell” will require a fire permit for sprinkler and fire alarm if applicable. Those systems (for the “shell”) must be accepted into service prior to any “tenant fit out” fire permits being issued.

  • 36.Construction or renovations cannot be started until building plans are approved.
  • 37.Fire alarm systems, fire suppression systems, hoods, exhaust ducts, and hood suppression systems require a fire permit from the Fire Marshal’s Office. This work cannot be started until the permit is approved.
  • 38.Building cannot be occupied by the public until a Certificate of Occupancy is obtained.
  • 39.The following is City Ordinance, Appendix B-Zoning, Article 8 Enforcement and Penalties:

Section 1. - Building permits.

No building or structure in any district shall be erected or structurally altered without a building permit duly issued upon application to the building inspector. No building permit shall be issued unless the proposed construction or use is in full conformity with all the provisions of this ordinance. Any building permit issued in violation of the provisions of this ordinance shall be null and void and of no effect, without the necessity for any proceedings for revocations or nullification thereof, and any work

133

Página 134

Item 5.

undertaken or use established pursuant to any such permit shall be unlawful (see section 4 for penalties).

1.1 No building permit shall be issued for the construction or alteration of any building upon a lot without frontage upon, or legal permanent access to, a public street improved to the satisfaction of the planning commission, or without access to a public sewer.

1.2 No building permit shall be issued for any building where the site development plan of such building is subject to approval by the planning commission, except upon approval of such plans approved by the said commission.

1.21 No building permit shall be issued for any building in a subdivision unless the subdivision plot has been approved by the planning commission.

1.3 No building permit shall be issued for a building to be used for any conditional use in any zone where such use is allowed only with approval of the planning commission, unless and until such approval has been duly granted by the said commission.

(Ord. of 7-12-1993, § 3)

ADDITIONAL / SPECIFIC REQUIREMENTS TO OBTAIN APPROVAL:

  • 1.Need to discuss adding a fire hydrant at the rear of the emergency access lane
  • 2.FDC needs to have clear access

APPLICABLE CODES LISTED BELOW (NOT LIMITED TO):

2024 NFPA 1 Fire Code (NFPA; National Fire Protection Association) 2024 NFPA 101 Life Safety Code (NFPA; National Fire Protection Association) 2025 NFPA 72 National Fire Alarm and Signaling Code (NFPA; National Fire Protection Association) 2025 NFPA 13 Installation of Sprinkler Systems (NFPA; National Fire Protection Association) 2009 IBC (International Building Code) Latest editions of all other NFPA Codes as defined by the Delaware State Fire Prevention Regulations 2021 Delaware State Fire Prevention Regulations City of Dover Code of Ordinances

*If you have any questions or need to discuss any of the above comments, please call the above contact person listed.

134

Página 135

Item 5.

From: Akbar, Ali (DelDOT)
To: Melson-Williams, Dawn; Purnell, Maretta
Cc: Mobley, Will (DelDOT)
Subject: EXTERNAL: DAC Plan Comments
Date: Friday, January 2, 2026 10:20:10 AM

Some people who received this message don't often get email from ali.akbar@delaware.gov. Learn why this is important

WARNING: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning,

Here are the comments from DelDOT for the applications discussed in the DAC Committee Meeting.

S-26-01 Bayhealth Medical Center, Inc. - Kent Campus: Master Plan Phases 1-3 Comments: Schedule a pre-submittal meeting with DelDOT

S-26-02 R.E. Pierson Regional Headquarters (Office, Garage and Contractors yard) at 30 Lafferty Lane Comments: Schedule a pre-submittal meeting with DelDOT NOTE: Project appears to have an entrance within the area of a Right Turn Lane on Eastbound Lafferty Lane to Cassidy Drive. Ensure entrance is NOT within the operational area of the RTL.

S-26-03 The Enclave Apartments: Revised Walker Road Apartments Comments: Schedule a pre-submittal meeting with DelDOT

S-26-04 DuPont Plaza at 747 N. DuPont Highway: Revised Master Plan Comments: Schedule a pre-submittal meeting with DelDOT

Please let me know if you have any questions.

Ali Akbar
Engineer I
DelDOT, Development Coordination
800 Bay Road
Dover, DE 19901
302-760-2910

135

Página 136

KENT CONSERVATION DISTRICT

Item 5.

1679 SOUTH DUPONT HIGHWAY • DOVER, DELAWARE 19901• (302) 608-5370 • WWW.KENTCD.ORG

CITY OF DOVER ADMINISTRATIVE SITE PLAN REVIEW JANUARY 2026

APPLICATION: The Enclave Apartments: Revised Walker Road Apartments
FILE #: S-26-03
REVIEWING AGENCY: Kent Conservation District
CONTACT PERSON: Cullen Baker
PHONE: (302) 608 - 5370
EMAIL: stormwater@kentcd.org

THE SUBJECT PROPOSAL HAS BEEN REVIEWED FOR CODE COMPLIANCE, PLAN CONFORMITY AND COMPLETENESS IN ACCORDANCE WITH THIS AGENCY’S AUTHORITY AND AREA OF EXPERTISE. THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS ELEMENTS WHICH NEED TO BE ADDRESSED BY THE APPLICANT:

Source: 2019 Delaware Sediment and Stormwater Regulations

CITY AND STATE CODE REQUIREMENTS:

  • 1.As the disturbance for this site will exceed 5,000 square feet, a detailed sediment and stormwater management plan must be reviewed and approved by the District prior to any land disturbing activity (i.e. clearing, grubbing, filling, grading, etc.) taking place. The review fee and a completed application is due at the time of plan submittal to the District’s office.
  • 2.The following notes must appear on the record plan:
  • a.The Kent Conservation District reserves the right to enter private property for purposes of periodic site inspection.
  • b.The Kent Conservation District reserves the right to add, modify, or delete any erosion or sediment control measure, as it deems necessary.
  • c.A clear statement of defined maintenance responsibility for stormwater management facilities must be provided on the Record Plan. ADVISORY COMMENTS TO THE APPLICANT:
  • 1.A pre-application meeting will need to be held with KCD prior to submitting plans for review.
  • 2.If the intent is to discharge the site’s stormwater to an existing DelDOT pond, we will require a shared use agreement between the developer & DelDOT. The agreement should specify the right to discharge to the offsite facility and define who is responsible for maintenance.
  • 3.Hydrology calculations will need to be provided for the existing offsite pond to verify that it will be able to control the increased stormwater runoff from the proposed site.
  • 4.Please note the Kent Conservation District will not review an application more than three times. If after the third review the plan is still not found to be approvable, the application will be denied, and a new application with review fees are to be re-submitted to continue a detailed plan review.
  • 5.A letter of no objection to recordation will be provided upon approval of the Sediment and Stormwater Management Plan.

136

Página 137

Item 5.

CITY OF DOVER Dover/Kent
DEVELOPMENT ADVISORY COMMITTEE
County
Metropolitan
ADVISORY BRIEF Planning
D.A.C. MEETING DATE: 1/7/2026 Organization

S-26-03 The Enclave Apartments: Revised Walker Road Apartments

FILE # S-26-03 REVIEWING AGENCY: Dover/Kent County MPO

CONTACT PERSON: Malcolm Jacob PHONE #: (302) 387-6030

Attached, please find comments submitted by Dover Kent MPO for each of the current City of Dover Development Advisory Committee (DAC) applications. These comments are a part of the MPO’s ongoing goals of promoting transportation safety and connectivity within the region. They are submitted in accordance with the support given by the MPO Council on November 6, 2024.

Issues of concern to the MPO are effective transit, reducing the amount of vehicle emissions by shortening or eliminating trips, and facilities for alternative modes of transportation, including bicycle and pedestrian access. The MPO considers the bicycle facilities required by the City of Dover to be the standard for all applications, not to be waived.

City of Dover Planning Commission
Site Development Plan Review

S-26-03 The Enclave Apartments: Revised Walker Road Apartments

This site plan includes many of the features needed for pedestrian safety. Sidewalks are already present along the property’s frontage, and a network of internal sidewalks is planned for the site. One thing to note is that the sidewalks should contain ADA ramps at each end. This is something the site plan currently does not depict.

In terms of bicycle connectivity, in the Dover Bicycle and Pedestrian Plan, Walker Road was identified as a barrier to most bicyclists, due to the heavy traffic, the lack of shoulders, and the lack of alternative routes. The road is a Major Collector with an Annual Average Daily Traffic (AADT) of 6,431 and a posted speed limit of 35 mph. Solutions proposed in the document include uninterrupted shoulders between Saulsbury Road and Kenton Road as well as other measures. Improvements such as these should be considered for the frontage of this property to meet the goals of the Bicycle and Pedestrian Plan.1 1 Dover Bicycle and Pedestrian Plan. City of Dover (2020). https://doverkentmpo.delaware.gov/files/2021/04/Dover-Bicycle-and-Pedestrian-Plan-2020-FINAL- 1.pdf#page=127.

137

Página 138

Item 5.

The plan depicts crosswalks connecting each side of the property entrance. Note that painted crosswalks would also be useful within the parking area and connecting to the residential buildings. The crosswalks should include ADA ramps at each end for improved mobility. Similarly, the accessible parking spaces should be accompanied by ADA ramps placed in convenient locations, so that the building entrances are easily accessible.

Bike racks are proposed for the property, and the number of bicycle spaces in the site plan will meet the City of Dover’s requirements for bicycle parking. The bike racks should be placed in a secure location that is close to the building entrances.

Given the expected volume of incoming and outgoing vehicle traffic, it may be necessary to add turn lanes into the property from Walker Road. This would help improve the flow of traffic and reduce the likelihood of a crash. The applicant should work with DelDOT to determine the need for such improvements.

Finally, note that a DART bus stop is located on the north side of Walker Road, immediately to the east to the planned property entrance. Any changes to the roadway, sidewalks, and other infrastructure should not impede access to this bus stop.

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Department as soon as possible.

138

Página 139

Item 5.

S COTT ENGINEERING, INC.
Consulting Engineers ● Surveyors ● Land Planners

January 7, 2026

Mrs. Dawn Melson-Williams
City of Dover
Department of Planning and Inspections
P.O. Box 475
Dover, DE 19903

RE: The Enclave Apartments – WAIVER REQUEST
Walker Road
Dover, DE
T.M.P. No. ED-05-067.18-01-71.00-000
City of Dover Site Plan Application No. S-26-03
SEI Project No. 3207

Dear Mrs. Melson-Williams:

On behalf of Dover Synergy Group, LLC., our firm submitted a site plan for review and approval by the Planning Commission for the development of two (2) apartment buildings with a total of 48 units, located on the north side of Walker Road and west of Independence Blvd. between Village at McKee Branch on the west side and Liberty Court Apartments on the east side. We are requesting a waiver from Article 6 Section 3.6(b) of the Zoning Ordinance that requires upright cubing for parking lots and drive aisles for the drive aisle that wraps around the side and rear of the 2 apartment buildings as submitted to the Planning Commission for their review and action at their January 20, 2026, meeting.

The City of Dover zoning regulations require that curbing be installed around all parking areas and drives. Our client is requesting that a waiver be granted to allow for the elimination of curbing in several areas of the site to alleviate or eliminate the potential drainage problems caused by installing curbing and to allow for better water quality treatment. The areas that a waiver for curbing are being requested are the rear emergency access lanes on the side and rear of each building. The reason for the request is to allow for the implementation of proper drainage off the rear emergency access drive aisle and meet stormwater management quality requirements of the State of Delaware by using Best Management Practices (BMP’s).

The paved drive aisles in this area will be designed to sheet flow in lieu of concentrated flow toward the grassy areas adjacent the pavement. This practice will allow the aisle to drain across grass areas to filter and clean the water. When curbing is installed, the water becomes trapped on site and must be handled by catch basins and storm drainage pipe. The site is relatively flat and does not have enough fall to collect the stormwater in storm drain systems along the access drive aisles and drain across the site to the discharge point at the existing stormwater management pond.

Thank you for your consideration in this waiver. Should you have any questions or require additional information please let me know.

Sincerely,

S COTT Engineering, Inc.

Gregory R. Scott, P.E. Cc: Tolano Anderson 22 Old Rudnick Lane ● Suite 2 ● Dover, Delaware 19901 ● Tel: 302-736-3058 ● Fax: 302-736-3059 info@scottengineering.com ● www.scottengineering.com

139

Página 140

Item 5.

City of Dover
DATA SHEET FOR RECREATION PLAN REVIEW
Review of Active Recreation Area Plan

PARKS, RECREATION AND COMMUNITY ENHANCEMENT COMMITTEE

MEETING OF January 13, 2026
PLANNING COMMISSION MEETING of January 20, 2026

Plan Title: The Enclave Apartments on Walker Road, S-26-03

Plan Type: Site Development Plan and Active Recreation Area Plan

Location: North side of Walker Road and west of Independence Boulevard; northeast of the intersection of Kenton Road and Walker Road in Dover, DE between harmony Road and the Liberty Court Apartments and north of 1325 Walker Road

Address: Unaddressed off Walker Road

Tax Parcel: ED-05-067.18-01-71.00-000

Owner: Dover Synergy Group, LLC

Site Area: 6.08 acres +/-

Zoning: RM-2 (Medium Density Residence)

Current Use: Vacant Land (Open Land, Woodland, and Stormwater Pond Area)

Proposed Use: Garden Style Apartments (Multi-family Community) Dwelling Units: 48 units

Parking: Required: 115 spaces
Proposed: 115 spaces

Water and Sewer: City of Dover

For Consideration: Active Recreation Area Plan
Recreation Area: Required – 10,000 SF
Provided – 10,900 SF

  • P.O. Box 475 Dover, DE 19903 140 Community Excellence Through Quality Service

Página 141

Item 5. S-26-03 The Enclave Apartments on Walker Road: Active Recreation Area Plan Review Report Parks, Recreation and Community Enhancement Committee Meeting of January 13, 2026

  • I.PROJECT SUMMARY: This Application S-26-03 is for Review of a Site Development Application for The Enclave Apartments consisting of the construction of two (2) three story, garden style apartment buildings consisting of twenty-four (24) units each for a total of 48 units. Also proposed are a Clubhouse, parking lot improvements, and four (4) outdoor recreation areas. The property is zoned RM-2 (Medium Density Residence Zone). The subject site consists of one parcel totaling 6.08 acres +/- located on the north side of Walker Road and west of Independence Boulevard. The owner of record is Dover Synergy Group, LLC. Property Address: unaddressed parcel on Walker Road. Tax Parcel: ED-05-067.18-01-71.00-000. Council District 4. For Consideration: Active Recreation Area Plan.

Previous Application: A prior Site Plan application for this site, S-23-22 Walker Road Apartments, was reviewed by the Planning Commission in December 2023. That Site Plan proposed 48 garden-style apartments in two buildings but included a layout where the buildings were in the center of the site with the parking and drive aisles surrounding them and a different active recreation area layout. Site Plan S-23-22 is expired having not achieved final plan approval.

II. ACTIVE RECREATION AREA PLAN SUMMARY:

The Site Development Plan as submitted by the applicant for The Enclave Apartment Complex notes four Active Recreation features consisting of a basketball half court, a volleyball court, and two Active Recreation areas along with a Clubhouse Building including a leasing office.

This project qualifies for consideration as a “small development” and its exemption option for recreation area calculations found in Zoning Ordinance, Article 5, Section 10.514. This subject property is less than 10 acres in size and has a density of 7.89 dwelling units per acre. The Active Recreation Area is required at a rate of 150 SF per unit or 10,000 SF (0.23 acres), whichever is greater. With this project of forty-eight (48) units, the Active Recreation Area requirement calculates to 7,200 SF which is less than the 10,000 SF. The Active Recreation Areas proposed are shown on the overall Site Plan, and the calculations are provided in the Data Column on page L-1 Landscape and Active Recreation Plan. See Summary Table below of Active Recreation Areas.

Active Recreation Area (Article 5 §10.514) Required Provided on Plan 150 S.F. per dwelling unit or 0.23 • Basketball half court (2,500 SF) acre (10,000 SF) whichever is • Volleyball Court (1,800 SF) greater to be provided on site. • Unspecified Recreation Area (1,600 SF) on west side • Unspecified Recreation Area (2,000 SF) on east side 48 DU = 7,200 SF (0.23 +/- ac) • Clubhouse (3,000 SF as active area)* subject to area Required = 10,000 SF future adjustment as part of building is to be the Leasing Office. The overall size of the Clubhouse Provided: 10,900 SF* Building is listed as 3,613 SF. • *Need detailed size of areas within the Clubhouse to confirm

141

Página 142

Item 5. S-26-03 The Enclave Apartments on Walker Road: Active Recreation Area Plan Review Report Parks, Recreation and Community Enhancement Committee Meeting of January 13, 2026

Article 5 Accessible There are sidewalks connecting the Clubhouse to the §10.151 sidewalk system for the rest of the property. The basketball half court, volleyball court, and one unspecified active recreation area are located near the Clubhouse, with sidewalk access provided. A separate unspecified recreation area is provided east of the parking lot, which is accessible by sidewalk. 10.152 Pedestrian oriented Other than the sidewalks around the parking lot, there are not any recreational walking paths. 10.153 Age Oriented The four types of recreation areas are outlined in the plans. The activity specifics are not listed for the Clubhouse or the Active Recreation open areas. There are not any child-aged playgrounds shown on the plan. 10.154 Parking Parking is provided for the buildings in a central parking lot. The majority of the recreational amenities are shown on the west side of the property. There is sufficient parking provided to support the recreation amenities. 10.155 Walking, jogging There are 4 bike racks on the site plan, each can hold 4 bikes. and biking trails The requirement is 1 bike space for every 20 car spaces (Article 6, Section 3 of the Zoning Ordinance). Six minimum bike spaces should be provided in total. There are 16 bike spaces provided. 10.156 Setbacks The game court surfaces must maintain a 30-foot setback from the property lines; the plan appears to just meet this. The recreation area on east side of the site is adjacent to 30- foot buffer from the wetland boundary. 10.157 Landscaping Based on the information provided by the applicant, 58 trees area required. The applicant has proposed planting 61 trees. The Landscape Plan will need to be signed off by a Landscape Architect as per Zoning Ordinance. • The woodland areas to remain are shown and no more than 50% of the existing woodland may be cleared for development without a mitigation plan. • There is a Landscape Plan provided for the new tree plantings of deciduous and ornamental trees. 10.158 Area The breakdown of the allotted recreation areas is listed on the plans. We will need clarification on the Clubhouse building interior and the area used for recreation versus that for leasing office area for confirmation.

III. REVIEW PROCESS

The Planning Office has prepared this Active Recreation Area Report outlining the Recreation Area proposal. The Parks, Recreation and Community Enhancement Committee will need to consider the proposed Active Recreation Area and make a recommendation. The Planning Commission must act to accept the Recreation Area Plan as part of the Site Plan review process. 142

Página 143

Item 5. S-26-03 The Enclave Apartments on Walker Road: Active Recreation Area Plan Review Report Parks, Recreation and Community Enhancement Committee Meeting of January 13, 2026

The Parks, Recreation and Community Enhancement Committee will review the Recreation Area Plan at their meeting on January 13, 2026. The Planning Commission Public Hearing and Review of the Site Development Plan S-26-03 is scheduled for January 20, 2026.

IV. CODE CITATIONS:

Dover Code of Ordinances, Appendix B – Zoning, Article 5 – Supplementary Regulations, Section 10 – Open Space, Recreation and Other Public Facilities (select excerpts).

Article 5 Section 10 Section 10. - Open space, recreation, and other public facilities. The City of Dover shall require the reservation of open space, recreation, and other public facilities in accordance with the provisions of this section as a condition of approval for all one-family dwelling, two-family dwelling and multiple-family dwelling residential developments requiring conditional use approval, site development plan approval, or land subdivision approval by the City of Dover Planning Commission.

10.1 Recreation areas. 10.11 Purpose. The purpose of this section is to ensure that active recreation areas are provided as an integral design element within residential developments and that such facilities are of an adequate scale in relation to the size of the residential development and which provide residents with a variety of active recreational pursuits.

10.12 Dedication required. The commission shall require the dedication or reservation of recreation areas, and the subsequent construction of recreation facilities of a character, extent and location suitable to the needs created by a development for recreation facilities as defined and in accordance with the design guidelines set forth.

10.13 Definition. The following are illustrative of the types of recreation areas and subsequent facilities that shall be deemed to serve active recreational needs and therefore to count toward satisfaction of the recreation area requirements of this section: tennis courts, handball courts, racquetball courts, swimming pools, saunas and exercise rooms, meeting or activity rooms within clubhouses, baseball and soccer fields, basketball courts, volleyball courts, swings, slides and play apparatus, and developed walking, jogging or biking trails.

10.14 Recreation area review….
10.15 Design guidelines…

10.16 Area required. All residential developments shall provide recreational areas in a size equal to 275 square feet per dwelling unit or one-half acre of land, whichever is greater. In no case shall the commission require that more than ten percent of the gross area of the development be so dedicated or reserved when the gross area is greater than five acres.

10.5 Exemption to recreation and open space dedication.

10.514 Residential developments of ten (10) or fewer acres with a density over six units per acre. These developments shall be exempt from the area requirements set forth in section 10.16, but shall be required to provide 150 square feet of active recreation area per dwelling unit or 10,000 square feet of active recreation area, whichever is greater. If the commission determines that the construction of some or all of the required active recreation area is not practical or desirable, the commission shall require a cash-in-lieu donation for the active recreation area determined as not practical or desirable. Cash-in-lieu amount shall be in accordance with subsection 10.173 of this article.

143

Página 144

Item 5. S-26-03 The Enclave Apartments on Walker Road: Active Recreation Area Plan Review Report Parks, Recreation and Community Enhancement Committee Meeting of January 13, 2026

  • V.STAFF RECOMMENDATIONS The following are comments and recommendations from staff of the Planning Office following review of the Active Recreation Area Plan for The Enclave Apartments.
  • 1)The project plan is required to provide 10,000 SF of Active Recreation Area. The Plan shows a total of 10,900 SF of Active Recreation Area including four Active Recreation features consisting of a basketball half court, a volleyball court, and two Active Recreation areas along with a Clubhouse Building. Staff recommends approval of the proposed Active Recreation Area amenities, subject to the conditions and recommendations below.
  • 2)Recreation Areas: As a residential development, there is a requirement for Active Recreation area(s). Staff recommends the following regarding these Recreation Area amenities:
  • a)Sport Courts:
  • i.The recreation areas outlined for specific sports should indicate the materials used for court areas. ii. Ensure that game courts maintain the 30-foot setback from property lines. iii. Connecting these areas to the walking paths would allow for wheelchair and stroller access.
  • b)Clubhouse:
  • i.There should be specifics on what recreation or activities can transpire in the Clubhouse. ii. List size of areas with Clubhouse as Leasing Office area does not count.
  • c)Active Recreation Areas:
  • i.Provide details for the unspecified active recreation areas as to whether they will be open lawn area or have amenities. ii. Ensure the unspecified active recreation area east of the parking lot is not located within the required 30-foot buffer from the wetland boundary.
  • 3)Sidewalk Curb Cuts: No curb cuts or ramps are shown on sidewalks or near street crossings; add accessible ramps.
  • 4)Bicycle Parking:
  • a)The location of the bike racks is recommended to be directly adjacent to a paved/sidewalk area but off set to not impede passage.
  • b)Consider any opportunities for bicycle parking facilities either to be covered or otherwise provided at interior locations.
  • 5)Landscaping: A Landscape Architect will need to sign off on the Landscape Plan as required by the Zoning Ordinance. The amount of woodland clearing is 49.9%, Please ensure that this is correct, as a maximum of 50% of the woodland area is permitted to be cleared. Please identify woodland and tree protection measures for those trees and woodland areas that will be preserved.

144

Página 145

Item 5. S-26-03 The Enclave Apartments on Walker Road: Active Recreation Area Plan Review Report Parks, Recreation and Community Enhancement Committee Meeting of January 13, 2026

VI. ADVISORY COMMENTS

  • 1)This Site Development Plan set depicting the Recreational Areas is to include appropriate improvements, plans, and details of the Active Recreation Area as approved.
  • 2)There shall be provisions which ensure that the community space (all areas under consideration for Active Recreation Areas) shall continue as such and be properly managed and maintained. The developer shall either retain ownership and responsibility for maintenance of the common use areas or provide for and establish one (1) or more organizations for the ownership and maintenance of all common spaces, i.e., a Homeowners Association or other property management entity. The organization shall be responsible for maintenance, insurance, and taxes on the community space.
  • 3)In the event that major changes and revisions to the Plan occur in the finalization of the Plan, contact the Planning Office. Examples include reorientation of buildings, relocation of site components, changes in floor area or unit count, or design revisions impacting Active Recreation Areas. These changes may require resubmission for review by the Development Advisory Committee, Planning Commission, or other agencies and commissions making recommendations in regard to the plan.
  • 4)The Parks, Recreation, and Community Enhancement Committee shall submit to the Planning Commission a report detailing the recommendations as to the Recreation Area Plan.

Attachments: • Excerpt from Site Plan Set S-26-03 The Enclave Apartments: Sheet L-1 Landscape and Active Recreation Plan • Building Rendering of Clubhouse

Note: This review Report was initially prepared by Staff of the Rossi Group (under a Planning Services contract with the City of Dover). The Report was completed with additional review and editing by the City’s Planning Office.

145

Página 146

Item 5.

146

Página 147

Item 5.

147

Página 148

Item 5.

A RESIDENTIAL COMMUNITY
THE ENCLAVE APARTMENTS
DOVER, DE
N.T.S. 148

Página 149

Item 5.

A RESIDENTIAL COMMUNITY
WALKER ROAD APARTMENTS CLUBHOUSE
DOVER, DE
N.T.S.
149

Página 150

Item 6.

City of Dover
DATA SHEET FOR SITE PLAN REVIEW

DEVELOPMENT ADVISORY COMMITTEE MEETING OF January 7, 2026

PLANNING COMMISSION MEETING OF January 20, 2026

Plan Title: Dupont Plaza - 747 North DuPont Highway S-26-04

Plan Type: Site Development Master Plan/Minor Subdivision Plan

Location: East side of N. DuPont Highway at the intersection of Leipsic Road in Dover, DE

Owner: Rojan DD 15, LLC

Address: 747 North DuPont Highway, Dover DE 19901

Tax Parcel: ED05-068.05-01-15.00-000

Site Area: 9.95 +/- acres

Present Uses: Vacant Land

Proposed Use: Retail plaza (Retail Buildings and Restaurant)

Zoning: SC-2 (Community Shopping Center)
SWPOZ (Source Water Protection Overlay Zone) – Tier 3 Excellent
Recharge Area

Impervious Area: Existing: 335,197 +/- SF (77.4%) Proposed: 310,513 +/- SF (71.6%)

Building Area: 44,619 +/- SF total:
22,183 +/- SF Tractor Supply Company
12,950 SF retail location divided into four separate retail spaces
7,440+/- retail location
2,046 +/- SF restaurant

Onsite Parking: 247 total vehicle parking spaces: 235 standard parking spaces, 12 ADA parking spaces, and 17 bicycle spaces

Sewer & Water: City of Dover

Waivers Request: Subdivision Waiver – Lot without Public Street Frontage

  • P.O. Box 475 Dover, DE 19903 150 Community Excellence Through Quality Service

Página 151

Item 6.

CITY OF DOVER

City of
DEVELOPMENT ADVISORY COMMITTEE Dover
Planning
APPLICATION REVIEW COMMENTARY Office

D.A.C. MEETING DATE: January 7, 2026

APPLICATION: DuPont Plaza Review of a Site Development Plan at 747 N DuPont Hwy

FILE #: S-26-04 REVIEWING AGENCY: City of Dover Planning

CONTACT PERSON: Dawn Melson-Williams, AICP PHONE: 302-736-7196

Note: This Review Report was initially prepared by Staff of the Rossi Group (under a Planning Services contract with the City of Dover). The Report was completed with additional review and editing by the City’s Planning Office.

  • I.PLAN SUMMARY

This Application is for Review of a Site Development Master Plan to permit construction of a retail plaza in the City of Dover, to be located east of the intersection of N State Street and Leipsic Road in Dover, DE. The proposal includes four (4) retail spaces: 21,930 +/- SF tractor supply company, a 12,950 SF retail space, a 7,440+/- SF retail (was to be America’s Tire store), and a 2,046 +/- SF restaurant, with 247 total vehicle parking spaces, landscaping, and stormwater management features. The 9.95 +/- acre property is currently vacant (98,204 +/- SF open space) with no building structures and 335,397 +/- SF of impervious space. The current owners of record are Rojan DD 15, LLC. Property Address: 747 North DuPont Highway, Dover DE 19901. Tax Parcel: ED05-068.05-01- 15.00. Council District 3.

Preliminary Land Use Services Review (PLUS): An application (PLUS Review #2018-02-02) related to this property was reviewed on February 28, 2018 by the State’s Preliminary Land Use Services, as required by the City of Dover’s Memorandum of Understanding (MOU). This MOU requires that non-residential developments of over 75,000 square feet or residential developments containing 125 or more dwelling units complete the PLUS Review process prior to application submission. The development proposal submitted in 2018 by the developers to PLUS envisioned a version of this project that had 76,570 S.F. of commercial space for the 10-acre portion of 747 North DuPont Highway as well as a 240-unit apartment complex for the 15-acre portion. Copies of the PLUS Review Comments are available in the Application file (S-19- 03) on record in the Planning Office. 747 North DuPont Highway has gone through the PLUS Review process twice before, once in 2007 (Review #2007-01-06) for the Dover Crossroads project and once in 2014 (Review #2014-04-05) for an 81,118 S.F. shopping center, which was never submitted to the city for review and thus never materialized.

As the proposed structure area is less than 75,000 SF, this project S-26-04 was not required to complete PLUS Review process.

151

Página 152

Item 6.
S-26-04 DuPont Plaza at 747 North DuPont Highway Revised Master Plan
Final DAC Report of January 7, 2026

Previous Applications There have been several applications for redevelopment of this property. In 2007, the site at 747 North DuPont Highway was previously proposed for redevelopment as Dover Crossroads proposing to consist of two (2) major buildings and three (3) pad sites totaling 216,650 S.F. The shopping center would have used the entire 25 acres of the previous 747 North DuPont Highway parcel, instead of just the southern area (approximate 10 acres) as the current project does. The project first involved rezoning the three parcels then comprising 747 North DuPont Highway from C-4 to SC-2 under rezoning application Z-07-05. The project’s Site Development Plan S-07-39 was then reviewed by the Planning Commission at their meetings of August 20 and September 17, 2007; and the project received Final Approval on September 8, 2008. Several further steps were taken towards starting the development, including consolidating the three parcels, demolition of the existing buildings on site formerly belonging to Berry Van Lines, and approval of a Unified Comprehensive Sign Plan (US-08-01), but construction ultimately did not commence, and the Site Plan expired.

A Minor Subdivision Plan for 747 North DuPont Highway was reviewed by the Planning Commission at their meeting of February 20, 2018 (SB-18-01) with a one-year extension of approval granted at the Commission’s meeting of February 19, 2019. The Minor Subdivision Plan divided the 25-acre parcel into a southern 10-acre parcel and a northern 15-acre parcel. Final Approval and recordation of the Minor Subdivision Plan occurred in February 2020.

In 2019, a Site Development Master Plan S-19-03 was submitted; it was distinguished from the prior 2007 plan by its smaller footprint, different layout of proposed buildings, and proposed cooperation with an adjacent hotel property. The Master Plan was subject to review by Planning Commission in March 2019 and July 2019. S-19-03 Retail Center at 747 N. DuPont Highway: Master Plan proposed construction of a retail center to consist of four buildings totaling 62,260 SF in three phases. The initial version of S-19-03 included three retail structures of 19,200 SF, 19,975 SF, and 11,900 SF respectively and a restaurant building (Golden Corral) of 11,185 SF. The project also involved reconfiguration of the property and parking for the hotel located at 764 Dover Leipsic Road owned by Delmarva Hotels LLC; however, a Master Plan Revision in July 2019 removed the concept of shopping center’s integration with the hotel property. The Final Plan approval of the S-19-03 Master Plan was issued in 2021 along with the approval of Administrative Site Plan S-19-18 DuPont Plaza: Phase 1. S-19-03 has since expired.

Most recently, S-22-12 was filed but stopped before the scheduled Planning Commission review in October 2022. This plan included a total of 52,190 SF of building area spread among three buildings. The buildings were proposed as retail uses.

Site Development Master Plan The plan for this project is submitted for review under the Site Development Master Plan process (See Zoning Ordinance, Article 10 §2.44 listed below). This process allows for a series of construction phases to be outlined in a Master Plan for Planning Commission review and approval. Prior to each Phase of construction, a Site Plan specific to that phase is submitted for Administrative Site Plan review.

Article 10 §2.44 Site development master plans. Conceptual site development master plans shall be reviewed by the planning commission in accordance with the provisions of subsection 2.43. Conceptual site development master plans shall depict a site development proposal that reflects general compliance with the provisions of the zoning ordinance and shall also reflect the following 152

Página 153

Item 6.
S-26-04 DuPont Plaza at 747 North DuPont Highway Revised Master Plan
Final DAC Report of January 7, 2026

information on the plan: (A) Conceptual Master Plan. Conceptual Master Plan shall include the proposed general layout of building, streets, parking, open space, landscape concepts, and stormwater management areas. (1) Detailed site construction plans, details, and specifications are not required as part of a site development master plan submission. (2) The plan shall illustrate distinct phase boundaries for each proposed construction phase and shall depict proposed construction and site improvements planned for each phase. Bulk quantities and area totals for each construction phase, and for the total site, shall be tabulated in a data column on the plan. (3) Each construction phase shall be enumerated in sequential order on the site development master plan according to the order of construction contemplated by the plan. Phases shall be implemented in accordance with the approved site development master plan unless the city planner approves an alternate phasing. (4) Each construction phase represented on the master plan shall be planned and designed to function independent of construction and site improvements contemplated in future construction phases in all respects, including but not limited to bulk area provisions of the zoning district in which the site is located, off-street parking requirements, site entrances, emergency access requirements, site utilities, and stormwater management improvements except where the requirements and needs of a later phase are met and remain met by a previous phase of completed construction. (5) Any special agreements or conditions of approval relative to the overall development that have been specified by regulatory agencies shall be documented on the site development master plan.

Phased site plan approval. Individual phased components of the Conceptual Master Plan are to be reviewed and approved as an Administrative Site Plan. Final site construction plans, including detailed site grading, paving, utilities, stormwater management, and tree planting and preservation plans shall be submitted for final approval by the city planner and/or authorized designee, and to other agencies having jurisdiction, on a phase by phase basis in accordance with the approved site development master plan, and all regulations of the City of Dover governing the approval of site plans as set forth in subsection 2.4 and 2.5.

II. PROJECT DESCRIPTION

The application proposes construction of four (4) commercial buildings (44,618 +/- SF total) to be constructed in four (4) separate phases, comprising a retail plaza in the City of Dover. The property is located on the east side of North DuPont Highway and south of Leipsic Road. Phase 1 includes a 22,183 +/- SF retail building to be occupied by Tractor Supply Company. Phase 2 includes a 7,440+/- SF retail space (identified as American Tire but will not be American Tire). Phase 3 includes a 12,950 SF retail location divided into four separate retail spaces. Phase 4 includes a 2,046 +/- SF restaurant. The plan proposes 247 total vehicle parking spaces, landscaping, and stormwater management facilities. The proposed site access will connect to North Dupont Highway on the southeast side of the site and will also connect to Leipsic Road from a shared driveway/entrance with The Edge Apartments along the northeast side of Comfort Inn & Suites

Surrounding Land Uses The subject property is located at the southeast corner of the intersection of North DuPont Highway and Leipsic Road. The site is bordered by retail spaces along Leipsic Road (west/northwest side) and restaurant/retail spaces on North DuPont Highway (south/southeast side). The parcel is zoned SC-2 (Community Shopping Center). Properties immediately adjacent to the subject project location on the west and southeast sides are zoned C-4 (Highway Commercial). The Dover International Speedway property to the southeast of the subject property is zoned CPO (Commercial Professional 153

Página 154

Item 6.
S-26-04 DuPont Plaza at 747 North DuPont Highway Revised Master Plan
Final DAC Report of January 7, 2026

Office) as and the apartment complex currently under development to the northeast of the parcel is also zoned SC-2. The subject parcel properties had impervious surfaces from previous commercial businesses that were removed prior to the proposed construction. The abutting commercial businesses are Citizens Bank, Pugh’s Automotive Service, and Comfort Inn & Suites (west/northwest side).

III. ZONING REVIEW

SC-2 (Community Shopping Center) The subject property is zoned SC-2 (Community Shopping Center). Article 3 §17 of the Zoning Ordinance details the permitted uses within the SC-2 (Community Shopping Center). Based upon the uses permitted in this zone, the proposed retail and restaurant uses are permitted. With the exception of minimum setbacks provided in Article 3 §17, Shopping Center zones follow the bulk standards for the C-4 zone, which are listed in Article 4 §4.15. The application, as submitted, complies with the required bulk standards. The subject property fronts only North DuPont Highway but shares an access driveway/entrance at the northwest corner of the parcel with The Edge Apartments.

Minor Subdivision Subdivision Waiver Request - Lots without Public Street Frontage The application includes a Minor Subdivision to create three lots. Each lot would meet the dimensional requirements set forth in Article 4 §4.15. The proposed subdivision would create one lot without frontage on a public street and one lot with limited frontage on a public street, which would require a waiver from the requirements of Dover Code of Ordinances, Appendix A – Subdivisions, Article VI.E.5, which requires that “All lots in a subdivision shall have frontage on a public street.” The applicant has submitted a waiver request to this effect. The Planning Commission will make a recommendation to City Council regarding the waiver request.

SWPOZ (Source Water Protection Overlay Zone) The parcel is entirely within zone SWPOZ (Source Water Protection Overlay Zone) - Tier 3 Excellent Recharge Areas. This zone's purpose is to protect public health and safety by minimizing contamination of the aquifer and to ensure that the aquifer is property maintained and supplied with clean water through the reduction of impervious surfaces.

The following uses are prohibited in the SWPOZ: Automobile body/repair shop, motor vehicle, boat or farm equipment service & Gas stations and motor vehicle service stations. Therefore, America’s Tire is prohibited in this zone. The applicant has indicated that America’s Tire is no longer a prospective tenant for this retail space.

Also, a cylindrical feature is shown on the Site Plan above the westernmost “Outdoor Display Area” of the proposed Tractor Supply Company and was not labeled or included in the legend. The applicant has indicated that this will be an above-ground storage tank for a propane filling station. Planning Staff is further evaluating this proposed above-ground storage tank since according to the Zoning Ordinance, Article 3 §29.74: Storage tanks. Underground storage tanks are prohibited within Tier 3 lands. Aboveground storage tanks which use, store, transfer, or dispose of any solid or liquid material or waste having potentially harmful impact on groundwater quality are prohibited within Tier 3 lands.

154

Página 155

Item 6.
S-26-04 DuPont Plaza at 747 North DuPont Highway Revised Master Plan
Final DAC Report of January 7, 2026

The Site Data Column indicates that the existing impervious area is 77.4%, and the proposed impervious area is 71.56%. According to the Zoning Ordinance, Article 3 §29.77: On a site development master plan, when the city engineer certifies that the project utilizes superior infiltration design that maximizes groundwater recharge, impervious cover may be increased to 75 percent.

The applicant will need to work with the City’s Department of Water, Wastewater and Engineering Services to demonstrate that the stormwater management plan meets the standard of “superior infiltration design.”

IV. PARKING SUMMARY

The SC-2 (Community Shopping Center) includes a minimum parking requirement. Article 3 §17.5 of the Zoning Ordinance requires that parking is calculated at 1 parking space per 300 SF of gross leasable area. Available ADA parking is 5 ADA spaces per standard parking spaces between 101 to 150. Based on the submitted plans of the proposed Dupont Plaza building leasable area (42,320 SF) [excluding the proposed restaurant (2,046 SF)], a minimum of 142 standard parking spaces and 5 ADA spaces would be required. Restaurant parking was calculated as one space per four (4) seats for a total of 13 spaces and 1 required ADA space. The Site Plan states that 247 total spaces will be provided. This exceeds the minimum parking requirement by 92 spaces.

Bicycle Parking Bicycle parking shall be provided for parking spaces at a rate of one (1) bicycle parking space for every twenty (20) parking spaces. Based on the 247 parking spaces provided, 13 bicycle spaces are required. The Plans submitted include 17 bicycle parking spaces (3 bicycle racks).

  • V.SITE CONSIDERATIONS

Site Access The site layout provides vehicle access on both North DuPont Highway and from Leipsic Road but for multiple separate commercial businesses and associated entrance/exit points. The proposed Site Plan connects North DuPont Highway with a 30-foot-wide driveway, providing rights-in/rights-out to and from North DuPont Highway. Access to Leipsic Road is provided via a shared driveway that crosses to the east of the Comfort Inn & Suites, serving the subject site and The Edge Apartments.

Pedestrian Site Access The site plan shows existing sidewalk on North DuPont Highway frontage of the site. A frontage sidewalk is required on all street frontages. A sidewalk into the site is also shown from the Leipsic Road driveway entrance along the north side opposite the parcel. Pedestrian access into the site is shown from North DuPont Highway with crosswalks and associated curb ramps with early warning detection across the front entrance. Curb ramps with early warning detection are present at the north side entrance, though no interior or exterior crosswalk is present at that location.

Trash Collection This site will utilize private trash collection. The Zoning Ordinance requires two (2) dumpsters for up to three stores, and then 1 per additional retail store. The restaurant requires two (2) dumpsters for the first 3,000 SF of space. The applicant requires a minimum of six (6) retail dumpsters and two (2) dumpsters for the restaurant. The applicant proposes ten (10) dumpsters total for the site, though only 5 for the retail space and none for the restaurant are shown on the Site Master Plan.

155

Página 156

Item 6.
S-26-04 DuPont Plaza at 747 North DuPont Highway Revised Master Plan
Final DAC Report of January 7, 2026

VI. BUILDING ARCHITECTURE

The application proposes a Tractor Supply Company retail building. The proposed 22,183 +/- SF single-story building is being designed to include a fenced live goods/garden center with a metal roof/canopy. The proposed one-story building will be 21 feet 4 inches tall with the entrance having a pitched roof. The proposed building will feature three main material palettes. The first includes 4- foot tan masonry banded along the base of the building. The second includes beige tones from the vertical metal planks along the sides and rear of the building with matte red metal trim through the center and along the roof. The third is a 5-foot band of galvanized corrugated metal awning along the front between 5-foot 4-inch bands of beige masonry. The building’s front entrance will feature the Tractor Supply Company logo above the door surrounded by the same galvanized metal.

Architectural renderings were not provided for the other proposed buildings.

The branding shown on the architectural elevations is not considered as part of the Site Plan review. A separate application for sign permits is required. All signage must comply with the requirements of Article 5, §4 Supplementary Sign Regulations. While all signage submitted has not been reviewed for compliance with Article 5, §4, please note the following: • A sign may be illuminated at night. Signs that are illuminated at night may not exceed a maximum luminance level of 750 cd/m2 or Nits, regardless of the method of illumination - as the proposed designs include lighting fixtures above the front entrance signage. • Signs that have external illumination, whether the lighting is mounted above or below the sign face or panel, shall have lighting fixtures or luminaries that are fully shielded - as the proposed designs include external lighting above the front entrance signage. • The site is eligible for a Unified Comprehensive Signage Plan in accordance with the Zoning Ordinance, Article 5 §4.8. A Unified Comprehensive Signage Plan provides flexibility to meet the signage needs unique to a shopping center or multi-building campus.

VII. TREE PLANTING AND LANDSCAPE PLAN

Tree Planting Requirements The Zoning Ordinance further requires tree planting at a rate of one tree per 3,000 SF of non- woodland development area. Based on the total non-woodland area for the submitted plan 433,601 SF, 145 trees are required to be planted. The applicant proposes to plant 152 trees, 103 of which will be canopy trees and 49 of which will be evergreen trees. An additional five (5) trees are included in the Arterial Street buffer. The Landscape Plan shows 46 shrubs planted throughout the site.

Arterial Street Buffer The Zoning Ordinance, Article 5 §7.3 requires a 30-foot-deep landscape buffer for nonresidential zoned property that fronts on a principal arterial street. The Arterial Street Buffer “shall be planted with a variety of trees, shrubs, and ground cover.” The Landscape Plan shows the required Arterial Street Buffer planted with a variety of trees and shrubs.

Required Shopping Center Design Requirements A 10-foot-wide buffer is required along all lot lines within the Shopping Center Zones. Additionally, at least 10 percent of the site area “shall consist of landscaping, pedestrian malls, and courtyards,” and parking must be landscaped.

156

Página 157

Item 6.
S-26-04 DuPont Plaza at 747 North DuPont Highway Revised Master Plan
Final DAC Report of January 7, 2026

The plan as submitted complies with these requirements when focusing on the perimeter of the development. Trees and shrubs are planted on landscape islands and sidewalk areas throughout the site. The 10-foot buffer along the lot lines is also proposed to be landscaped with trees and shrubs.

VIII. CITY AND STATE CODE REQUIREMENTS:

The subject proposal has been reviewed for code compliance, plan conformity, and completeness in accordance with the agency’s authority and area of expertise. The following items have been identified as elements which need to be addressed by the applicant:

  • 1)Minor Subdivision:
  • a)The application includes a Minor Subdivision to create three lots. The proposed subdivision would create lots without frontage on a public street, which would require a waiver from the requirements of Dover Code of Ordinances, Appendix A – Subdivisions, Article VI.E.5, which requires that “All lots in a subdivision shall have frontage on a public street.” The applicant has submitted a waiver request to this effect. The Planning Commission will make a recommendation to City Council regarding the waiver request.
  • b)A record plan is required for the Minor Subdivision.
  • c)Easements will be required for cross access, utilities, and stormwater management and must be reflected on the Record Plan.
  • 2)Sheet MP-1:
  • a)The scale of the Site Plan shown does not match the 1” =30’ scale in the legend.
  • b)The Site Plan Data Column states that 247 total spaces will be provided; however, the current Plans submitted show only 228 total parking spaces: 196 standard and 11 ADA parking spaces for the retail areas and 20 standard and one (1) ADA space for the restaurant. Please provide updated calculations and/or site drawings as needed. This update should be applied to all applicable plan sheets.
  • 3)The Site Plan lists ten proposed dumpsters total for the site, though only five dumpsters for the retail space and none for the restaurant are shown on the current Site Plan. The site plans for individual phases must demonstrate compliance with dumpster requirements.
  • 4)The Site Plan lists 17 provided bicycle spaces, though only 15 bicycle spaces (assuming the same size 5-slot bike rack) are shown on the current Site Plan (3 racks). Please provide updated calculations and/or site drawings as needed. The site plans for individual phases must demonstrate bicycle parking that complies with the requirements for the specific phase based on the number of vehicle parking spaces in that phase.
  • 5)The Retail (previous America’s Tire) building area shown on Site Plan is 7,440 +/- SF. However, the stated dimensions (115’x60’) only equate to 6,900 SF. This discrepancy must be addressed in the site plan for Phase 2.
  • 6)The plan proposes an above-ground storage tank for a propane filling station. Planning Staff is further evaluating this proposed above-ground storage tank for compliance with the SWPOZ (Source Water Protection Overlay Zone) provisions.
  • 7)Please work with the Department of Water, Wastewater and Engineering Services to demonstrate that the stormwater management plan meets the standard for superior infiltration design. 157

Página 158

Item 6.
S-26-04 DuPont Plaza at 747 North DuPont Highway Revised Master Plan
Final DAC Report of January 7, 2026

  • 8)The architectural elevations include signage locations. Signage is not approved as part of the Site Development Plan review and must be applied for through separate sign permits.
  • 9)Provide construction details for the following items but not limited to, dumpster enclosure, traffic control signage, lighting fixtures, bicycle racks, handicap signage, etc.
  • 10)Architectural elevations were provided for only one building (Tractor Supply). Architectural elevations must be submitted with each phase and will be referred to the Planning Commission for review.
  • 11)The construction of the site entrances and street improvements must comply with the requirements of DelDOT.
  • 12)Erosion & Sediment Control Plans and Stormwater Management Plans granted approval by the Kent Conservation District and Delaware Sediment and Stormwater Management regulations must reflect the Site Plan layout and design conditionally approved by the Planning Commission and be in compliance with the Zoning Ordinance and technical review requirements of other agencies.
  • 13)The Final Plan set must include notes documenting any action taken by the Planning Commission on the requested waivers and must list any additional conditions of approval.

IX. RECOMMENDATIONS SUGGESTED AS CONDITIONS OF APPROVAL TO MEET CODE OBJECTIVES:

In accordance with the Zoning Ordinance, Article 10 §2.2, the Planning Commission in considering and acting upon Site Development Plans may prescribe appropriate conditions and safeguards so that the public health, safety, and welfare, the comfort and convenience of the public in general, and the residents of the immediate neighborhood in particular shall be taken into consideration. These safeguards may to the maximum extent possible further the expressed intent of the Zoning Ordinance and the accomplishment of several objectives in particular listed in subsections 2.21 to 2.28. 1) Architecture: Staff recommends that the east elevation of the building be improved. Carrying the red band to this side of the building would provide additional architectural relief. The east elevation of the building will be visible from The Edge Apartments.

  • 2)Subdivision Waivers: The applicant has submitted a request for waivers from the requirements of Appendix A – Subdivisions, Article VI.E.5, which requires that “All lots in a subdivision shall have frontage on a public street.” The Minor Subdivision Plan submitted would create lots without frontage on a public street.

Staff recommends in favor of the requested subdivision waivers, based on the applicant’s explanation that the shopping center will be subject to cross access easements and a maintenance agreement. Staff recommends that cross access easements and any necessary utility easements be a condition of waiver approvals.

158

Página 159

Item 6.
S-26-04 DuPont Plaza at 747 North DuPont Highway Revised Master Plan
Final DAC Report of January 7, 2026

  • X.ADVISORY COMMENTS TO THE APPLICANT:
  • 1)In the event, that major changes and revisions to the Site Development Master Plan occur in the finalization of the Plan contact the Department of Planning and Inspections. Examples include relocation of site components like paving and increases in building footprint. These changes may require resubmittal for review by the Development Advisory Committee, Planning Commission, or other agencies and commissions making recommendations in regard to the Plan.
  • 2)Following Planning Commission approval of the Site Development Master Plan, the Check Print review and Phase 1 Administrative Site Plan may be addressed concurrently. The process for Site Development Master Plans is addressed in the Zoning Ordinance, Article 10 §2.44.
  • 3)Once the Site Development Master Plan is approved, each phase will be subject to an Administrative Site Plan. Please work with the Planning Office regarding phases.
  • 4)Other agencies and departments which participate in the Development Advisory Committee may provide additional comments related to their areas of expertise and code requirements.
  • 5)The applicant/developer shall be aware that prior to any ground disturbing activities on the site the appropriate Site Plan approvals, Pre-Construction meetings, site inspections and permits are required.
  • 6)For building new construction, the requirements of the building code and the fire code must be complied with. Consult with the Building Inspections Staff and City of Dover Fire Marshal regarding these requirements. The resolution of these items may impact the site design including such items as building dimensions and height, building openings, and fire protection needs, etc.
  • 7)The applicant shall be aware that Site Plan approval does not represent a Building Permit and associated construction activity permits. A separate application process is required for issuance of a Building Permit from the City of Dover. Building Permits will be required for each building.
  • 8)The applicant shall be aware that Plan approval does not represent a Sign Permit, nor does it convey permission to place any sign on the premises. Any proposed site or building identification sign may require a Sign Permit from the City of Dover prior to placement of any such sign in accordance with Zoning Ordinance Article 5 §4.

If you have any questions or need to discuss any of the above comments, please call the above contact person and the Planning Office as soon as possible.

159

Página 160

Item 6.

CITY OF DOVER
DEVELOPMENT ADVISORY COMMITTEE
APPLICATION REVIEW COMMENTARY
STAFF D.A.C. MEETING DATE: DECEMBER 31, 2025

APPLICATION: DuPont Plaza at 747 N. DuPont Highway: Revised Master Plan FILE #: S-26-04 REVIEWING AGENCY: City of Dover Department of Public Works and Water & Wastewater CONTACT PERSON: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services CONTACT PHONE #: 302-736-7025 CONTACT EMAIL: jlyon@dover.de.us

T HE S UBJECT P ROPOSAL HAS BEEN R EVIEWED FOR C ODE C OMPLIANCE , P LAN C ONFORMITY AND C OMPLETENESS IN A CCORDANCE WITH THIS A GENCY ’ S A UTHORITY AND A REA OF E XPERTISE . T HE F OLLOWING I TEMS HAVE BEEN I DENTIFIED AS E LEMENTS W HICH N EED TO BE A DDRESSED BY THE A PPLICANT :

CITY AND STATE CODE REQUIREMENTS

SANITATION / STORMWATER / STREETS / WATER / WASTEWATER / GENERAL

  • 1.Our office has no objection to the master plan. Further requirements will be provided if additional development plans are submitted, this specifically refers to the sanitary sewer plan.

TYPICAL CITY AND STATE CODE REQUIREMENTS REQUIRED FOR EACH FUTURE ADMINISTRATIVE SUBMISSION STORMWATER 1. The size, length, slope, type and flow directions must be shown on all existing and proposed storm sewer lines. Rim and invert elevations must be labeled on all stormwater structures. 2. Final site plan approval will not be granted until a copy of the approved Stormwater/Erosion and Sediment Control Plan from Kent Conservation District is submitted to our office. STREETS 1. Final site plan approval will not be granted until a copy of the approved entrance plan, signed by DelDOT is submitted to our office. SANITATION 1. The subject property cannot be serviced by the City of Dover. Provide a note on the plan stating that sanitation services will be provided by a private hauler. WATER 1. All water utility components must meet the requirements of the Water Wastewater Handbook, effective date March 22, 2010. Please contact our office for more information. 2. The following notes must be added to the plans: a. Hydrant connections by the contractor are prohibited. This method may not be utilized during any phase of the project. 160

Página 161

Item 6.
DuPont Plaza at 747 N. DuPont Highway: Revised Master Plan
File #: S-26-04
December 31, 2025

  • b.Any existing water lines not to be utilized by the proposed facility must be properly abandoned at the mains in accordance with the City of Dover Department of Water & Wastewater specifications and requirements.
  • c.The site contractor shall contact the City of Dover Department of Water & Wastewater Construction Manager at (302) 736- 7025 prior to the start of construction. A representative from the City of Dover Department of Water & Wastewater must observe and approve all City owned water and sanitary sewer interconnections and testing. All water taps must be performed by a City of Dover approved contractor. The proposed location for the water connection may need to be adjusted in the field due to conditions of the existing main. Possible conditions that would require tapping relocation include proximity to pipe joints, other taps, concrete encasements, conflict with other utilities, and the like. Test holes must be performed by the contractor to determine the best tapping location

Este documento es demasiado largo para mostrarlo completo aquí. Lea el resto en el PDF.

Volver a esta reunión