Este texto se extrajo de el PDF de forma automática y puede contener errores. El PDF es el registro oficial, así que consúltelo antes de confiar en esto.
23 páginas tienen poco o ningún texto legible aquí, a menudo por ser escaneos o dibujos. Para verlas, consulte el PDF.
Página 1
CITY OF DOVER, DELAWARE
COUNCIL COMMITTEE OF THE WHOLE MEETING
Tuesday, March 10, 2026 at 6:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
THIS AGENDA HAS BEEN REVISED BY ADDING PRESENTATION #2 – SPRINGBOARD
DELAWARE PROPOSAL TO PARTNER WITH NEWCITY CHURCH TO CREATE A
FACILITY WITH SHELTER AND WRAPAROUND SERVICES FOR HOMELESS WOMEN
AND CHILDREN (MIKE OSBORNE, PASTOR, NEW CITY CHURCH, AND JUDSON
MALONE, EXECUTIVE DIRECTOR, NEW CITY CHURCH FAMILY VILLAGE)
Public comments are welcomed on any item and will be permitted at the appropriate time. When possible, please notify the City Clerk (302-736-7008 or email at cityclerk@dover.de.us) should you wish to be recognized.
VIRTUAL MEETING NOTICE
This meeting will be held in City Hall Council Chambers with electronic access via WebEx. Public participation information is as follows:
Dial: 1-650-479-3208
Link: https://shorturl.at/OqHQy
Event number: 2530 525 0221
Event password: DOVER (if needed)
If you are new to WebEx, get the app now at https://www.webex.com/ to be ready when the meeting starts.
CALL COUNCIL COMMITTEE OF THE WHOLE MEETING TO ORDER
ADOPTION OF AGENDA
PRESENTATIONS
- 1.Discussion on Affordable Housing (Michelle Williams, Executive Director, Fuller Center for Housing of Delaware)
- 2.Springboard Delaware Proposal to Partner with New City Church to Create a Facility with Shelter and Wraparound Services for Homeless Women and Children (Mike Osborne, Pastor, New City Church, and Judson Malone, Executive Director, New City Church Family Village)
1
Página 2
COUNCIL COMMITTEE OF THE WHOLE MEETING - March 10, 2026 PAGE 2
COUNCIL REPORTS - February 2026
- 1.First District
- 2.Second District
- 3.Third District
- 4.Fourth District
- 5.At-Large
- 6.Council President Neil
UTILITY COMMITTEE
ADOPTION OF THE AGENDA
- 1.Dedication of Water Infrastructure – S. Bay Road (Jason Lyon, Director of Water and Wastewater)
(Staff Recommendation: Acceptance of water infrastructure within the right-of-way of Bay Road. Dedication is to include all of the referenced water infrastructure.) 2. Dedication of Water and Wastewater Infrastructure – Oak Shadows (Jason Lyon, Director of Water and Wastewater) (Staff Recommendation: Acceptance of water and wastewater infrastructure within the rights-of-way of the Oak Shadows development. Dedication is to include all of the referenced water and wastewater infrastructure.)
ADJOURNMENT OF THE UTILITY COMMITTEE MEETING
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
ADOPTION OF THE AGENDA
- 1.Update from the American Federation of State, County, and Municipal Employees (AFSCME) on Membership Priorities (Matt Carey, President of the AFSCME Union)
(Committee Action Not Required)
ADJOURNMENT OF THE LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE MEETING
ADJOURNMENT OF THE COUNCIL COMMITTEE OF THE WHOLE
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING
2
Página 3
Item 2.
3
Página 4
Item 2.
THE PALLET VILLAGE
4
Página 5
Item 2.
5
Página 6
Item 2.
6
Página 7
Item 2.
7
Página 8
Item 2.
8
Página 9
Item 2.
9
Página 10
Item 2.
10
Página 11
Item 2.
11
Página 12
Item 2.
12
Página 13
Item 2.
13
Página 14
Item 2.
14
Página 15
Item 2.
A Deployable Village Kit for
Low-Barrier Navigation Centers
15
Página 16
Item 2.
16
Página 17
Item 2.
17
Página 18
Item 2.
18
Página 19
New City Church
Item 2.
Dover DE
19
Página 20
New City Church and Item 2.
Springboard Family Village
Dover DE
20
Página 21
A Central Location (S Dupont, S Bay Rd, S
Item 2.
Little Creek)
New City Church
21
Página 22
Item 2.
Water, Sewer, and Power and Rear buffer area
22
Página 23
Item 2.
23
Página 24
Item 2.
Interim Housing Trailer System
| Trailer ID | Trailer Name | Use Category |
|---|---|---|
| A1 | Standard Low-Barrier Sleeping Trailer | Sleeping – adults, including partners, pets, possessions |
| A10 | ADA Low-Barrier Sleeping Trailer | Sleeping – ADA-accessible, low-barrier adults |
| A11 | Family Low-Barrier Sleeping Trailer | Sleeping – families with small children (pets allowed) |
| A2 | ADA Hygiene Bathhouse Trailer | Hygiene – single-occupancy ADA bathrooms |
| A3 | Universal-Design Laundry Trailer | Hygiene / Support – Resident and Operations Laundry |
| A4 Maintenance / Storage Trailer Back-of-House Support – facilities, tools, outdoor equipment, secure storage | ||
| A5 Commissary / Basic Needs Trailer Resident Support – donated goods, shelf-stable food, light cold storage | ||
| A6 | Staff Offices Trailer | Administrative / Resident-Facing Support – offices and small meetings |
| A7 | Provider / Clinic / Telehealth Trailer | Clinical / Behavioral Health / Care Coordination |
| A8 | Computer Lab / Training Trailer | Resident Services – digital access, learning, small group training |
| A9 | Welcome Center / Security Trailer | Entry, Reception, Safety & Campus Coordination |
| B1 | Dining + Warming Kitchen Trailer | Food Service / Assembly – meals, groups, gatherings |
B2 General Purpose Meeting Room Trailer Assembly / Program Space – meetings, groups, classes, events
24
Página 25
Item 2.
50 Sleeping Cabins
on One Acre!
+ Wraparound Services
25
Página 26
Item 2.
Interim Housing Trailer System
People shouldn’t have to wait in the streets for housing RAPID DEPLOYMENT
26
Página 27
Item 1.
CITY OF DOVER, DELAWARE
ACTION FORM
PROCEEDING: Council Committee of the Whole (Utility) DEPARTMENT OF ORIGIN: Water & Wastewater SUBMITTED ON: February 13, 2026 PREPARED BY: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services REVIEWED BY: David S. Hugg, III, City Manager and Patricia M. Marney, Controller / Treasurer
SUBJECT: Dedication of Water Infrastructure – S. Bay Road TIMETABLE: All water infrastructure within the right-of-way of Bay Road will become the responsibility of the City of Dover upon acceptance by City Council RELATED PROJECT: X REFERENCE: X
EXPENDITURE REQUIRED: $0
AVAILABLE BUDGET: $0
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
STAFF RECOMMENDATION:
Acceptance of water infrastructure within the right-of-way of Bay Road. Dedication is to include all of the referenced water infrastructure.
BACKGROUND AND ANALYSIS:
Pinnacle Development, the responsible party for completing the water infrastructure extension on S. Bay Road for the new Caliber Collision business, has requested that all water infrastructure within the right- of-way be dedicated to the City of Dover for permanent ownership and maintenance. Attachment A outlines the entire water infrastructure associated with this project. The total construction value of the infrastructure is $161,670. Attachment B shows the general location and configuration of the infrastructure that is to be accepted. All work was completed in accordance with City standards and specifications. A one (1) year Maintenance Agreement and a Release of Liabilities has been submitted as part of the dedication process. Required as-built drawings of the infrastructure have been provided to staff.
27
Página 28
Item 1.
DEDICATION OF WATER INFRASTRUCTURE
S. BAY ROAD
ATTACHMENT A
The following is a list of all water infrastructure which are to be accepted by the City of Dover:
Water Utility Infrastructure (Construction Value = $161,670.00):
| 24” Steel Casing | - | 156 l.f. |
| 12” Tapping Sleeve & Valve | - | 1 ea. |
| 12” C900 DR18 Water Main | - | 165 l.f. |
| 6” Fire Hydrant Valve | - | 1 ea. |
| Fire Hydrant | - | 1 ea. |
| 6” C900 DR18 Water Main | - | 20 l.f. |
28
Página 29
Item 1.
29
Página 30
Item 2.
CITY OF DOVER, DELAWARE
ACTION FORM
PROCEEDING: Council Committee of the Whole (Utility) DEPARTMENT OF ORIGIN: Water & Wastewater SUBMITTED ON: February 27, 2026 PREPARED BY: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services REVIEWED BY: Sharon J. Duca, Asst City Manager & Patricia M. Marney, Controller / Treasurer
SUBJECT: Dedication of Water and Wastewater Infrastructure – Oak Shadows TIMETABLE: All water and wastewater infrastructure within the rights-of-way of the Oak Shadows development will become the responsibility of the City of Dover upon acceptance by City Council RELATED PROJECT: X ATTACHMENTS: Attachment A – List of all water and wastewater infrastructure. Attachment B – Map of Oak Shadows REFERENCE: X
EXPENDITURE REQUIRED: $0
AVAILABLE BUDGET: $0
FUNDING SOURCE (Dept./Page in CIP & Budget): N/A
STAFF RECOMMENDATION:
Acceptance of water and wastewater infrastructure within the rights-of-way of the Oak Shadows development. Dedication is to include all of the referenced water and wastewater infrastructure.
BACKGROUND AND ANALYSIS:
The Oak Shadows development started construction in the early 1990’s. This was intended to be a private community with the water and wastewater infrastructure to be dedicated to the City of Dover. Utility easements are recorded for the city to access the utilities. Lots within the development were developed slowly over the next thirty (30) years. Throughout the construction of this subdivision, the city provided punch list items to be addressed by the developer. The current Oak Shadows Homeowners Association has requested that all water and wastewater infrastructure within the development be dedicated to the City of Dover for permanent ownership and maintenance and addressed the punch list items. Attachment A outlines the entire water and wastewater infrastructure associated with this project. The total construction value of the infrastructure is $298,435 (based on 1994 prices – year of installation). Attachment B shows the general location and configuration of the infrastructure that is to be accepted. All work was completed in accordance with City standards and specifications. Required as-built drawings of the infrastructure have been provided to staff. 30
Página 31
Item 2.
DEDICATION OF WATER AND WASTEWATER INFRASTRUCTURE
OAK SHADOWS
ATTACHMENT A
The following is a list of all water and wastewater infrastructure which are to be accepted by the City of Dover:
Wastewater Utility Infrastructure (Construction Value = $170,010 – 1994 Prices):
| 8” SDR-35 PVC Sanitary Sewer Main | - | 3,270 l.f. |
| 6” PVC Sanitary Sewer Laterals (29) | - | 932 l.f. |
| 5’ Diameter Manholes (15) | - | 150 v.f. |
Water Utility Infrastructure (Construction Value = $128,425 – 1994 Prices):
| 8” Ductile Iron Pipe (Class 52 Cement Lined) Water Main | - | 3,969 l.f. |
| 1” Copper Water Services (29) | - | 773 l.f. |
| 6” Ductile Iron Pipe (Class 52 Cement Lined) Water Main | - | 113 l.f. |
| 8” Gate Valve | - | 11 ea. |
| 6” Gate Valve (Fire Hydrant) | - | 4 ea. |
| Fire Hydrant | - | 4 ea. |
31
Página 32
Item 2.
32