Ir al contenido principal
AskDover

CCW Packet

Council Committee of the Whole. 10 de marzo de 2026.

Abrir el PDF (11.7 MB)

Este texto se extrajo de el PDF de forma automática y puede contener errores. El PDF es el registro oficial, así que consúltelo antes de confiar en esto.

23 páginas tienen poco o ningún texto legible aquí, a menudo por ser escaneos o dibujos. Para verlas, consulte el PDF.

Página 1

CITY OF DOVER, DELAWARE

COUNCIL COMMITTEE OF THE WHOLE MEETING

Tuesday, March 10, 2026 at 6:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware

AGENDA
THIS AGENDA HAS BEEN REVISED BY ADDING PRESENTATION #2 – SPRINGBOARD
DELAWARE PROPOSAL TO PARTNER WITH NEWCITY CHURCH TO CREATE A
FACILITY WITH SHELTER AND WRAPAROUND SERVICES FOR HOMELESS WOMEN
AND CHILDREN (MIKE OSBORNE, PASTOR, NEW CITY CHURCH, AND JUDSON
MALONE, EXECUTIVE DIRECTOR, NEW CITY CHURCH FAMILY VILLAGE)

Public comments are welcomed on any item and will be permitted at the appropriate time. When possible, please notify the City Clerk (302-736-7008 or email at cityclerk@dover.de.us) should you wish to be recognized.

VIRTUAL MEETING NOTICE

This meeting will be held in City Hall Council Chambers with electronic access via WebEx. Public participation information is as follows:

Dial: 1-650-479-3208
Link: https://shorturl.at/OqHQy
Event number: 2530 525 0221
Event password: DOVER (if needed)

If you are new to WebEx, get the app now at https://www.webex.com/ to be ready when the meeting starts.

CALL COUNCIL COMMITTEE OF THE WHOLE MEETING TO ORDER

ADOPTION OF AGENDA

PRESENTATIONS

  • 1.Discussion on Affordable Housing (Michelle Williams, Executive Director, Fuller Center for Housing of Delaware)
  • 2.Springboard Delaware Proposal to Partner with New City Church to Create a Facility with Shelter and Wraparound Services for Homeless Women and Children (Mike Osborne, Pastor, New City Church, and Judson Malone, Executive Director, New City Church Family Village)

1

Página 2

COUNCIL COMMITTEE OF THE WHOLE MEETING - March 10, 2026 PAGE 2

COUNCIL REPORTS - February 2026

  • 1.First District
  • 2.Second District
  • 3.Third District
  • 4.Fourth District
  • 5.At-Large
  • 6.Council President Neil

UTILITY COMMITTEE

ADOPTION OF THE AGENDA

  • 1.Dedication of Water Infrastructure – S. Bay Road (Jason Lyon, Director of Water and Wastewater)

(Staff Recommendation: Acceptance of water infrastructure within the right-of-way of Bay Road. Dedication is to include all of the referenced water infrastructure.) 2. Dedication of Water and Wastewater Infrastructure – Oak Shadows (Jason Lyon, Director of Water and Wastewater) (Staff Recommendation: Acceptance of water and wastewater infrastructure within the rights-of-way of the Oak Shadows development. Dedication is to include all of the referenced water and wastewater infrastructure.)

ADJOURNMENT OF THE UTILITY COMMITTEE MEETING

LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE

ADOPTION OF THE AGENDA

  • 1.Update from the American Federation of State, County, and Municipal Employees (AFSCME) on Membership Priorities (Matt Carey, President of the AFSCME Union)

(Committee Action Not Required)

ADJOURNMENT OF THE LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE MEETING

ADJOURNMENT OF THE COUNCIL COMMITTEE OF THE WHOLE

THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING

2

Página 3

Item 2.

3

Página 4

Item 2.

THE PALLET VILLAGE

4

Página 5

Item 2.

5

Página 6

Item 2.

6

Página 7

Item 2.

7

Página 8

Item 2.

8

Página 9

Item 2.

9

Página 10

Item 2.

10

Página 11

Item 2.

11

Página 12

Item 2.

12

Página 13

Item 2.

13

Página 14

Item 2.

14

Página 15

Item 2.

A Deployable Village Kit for
Low-Barrier Navigation Centers

15

Página 16

Item 2.

16

Página 17

Item 2.

17

Página 18

Item 2.

18

Página 19

New City Church
Item 2.

Dover DE

19

Página 20

New City Church and Item 2.

Springboard Family Village
Dover DE

20

Página 21

A Central Location (S Dupont, S Bay Rd, S
Item 2.

Little Creek)

New City Church

21

Página 22

Item 2.

Water, Sewer, and Power and Rear buffer area

22

Página 23

Item 2.

23

Página 24

Item 2.

Interim Housing Trailer System

Trailer IDTrailer NameUse Category
A1Standard Low-Barrier Sleeping TrailerSleeping – adults, including partners, pets, possessions
A10ADA Low-Barrier Sleeping TrailerSleeping – ADA-accessible, low-barrier adults
A11Family Low-Barrier Sleeping TrailerSleeping – families with small children (pets allowed)
A2ADA Hygiene Bathhouse TrailerHygiene – single-occupancy ADA bathrooms
A3Universal-Design Laundry TrailerHygiene / Support – Resident and Operations Laundry
A4 Maintenance / Storage Trailer Back-of-House Support – facilities, tools, outdoor equipment, secure storage
A5 Commissary / Basic Needs Trailer Resident Support – donated goods, shelf-stable food, light cold storage
A6Staff Offices TrailerAdministrative / Resident-Facing Support – offices and small meetings
A7Provider / Clinic / Telehealth TrailerClinical / Behavioral Health / Care Coordination
A8Computer Lab / Training TrailerResident Services – digital access, learning, small group training
A9Welcome Center / Security TrailerEntry, Reception, Safety & Campus Coordination
B1Dining + Warming Kitchen TrailerFood Service / Assembly – meals, groups, gatherings

B2 General Purpose Meeting Room Trailer Assembly / Program Space – meetings, groups, classes, events

24

Página 25

Item 2.

50 Sleeping Cabins
on One Acre!
+ Wraparound Services

25

Página 26

Item 2.

Interim Housing Trailer System

People shouldn’t have to wait in the streets for housing RAPID DEPLOYMENT

26

Página 27

Item 1.

CITY OF DOVER, DELAWARE

ACTION FORM

PROCEEDING: Council Committee of the Whole (Utility) DEPARTMENT OF ORIGIN: Water & Wastewater SUBMITTED ON: February 13, 2026 PREPARED BY: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services REVIEWED BY: David S. Hugg, III, City Manager and Patricia M. Marney, Controller / Treasurer

SUBJECT: Dedication of Water Infrastructure – S. Bay Road TIMETABLE: All water infrastructure within the right-of-way of Bay Road will become the responsibility of the City of Dover upon acceptance by City Council RELATED PROJECT: X REFERENCE: X

EXPENDITURE REQUIRED: $0

AVAILABLE BUDGET: $0

FUNDING SOURCE (Dept./Page in CIP & Budget): N/A

STAFF RECOMMENDATION:

Acceptance of water infrastructure within the right-of-way of Bay Road. Dedication is to include all of the referenced water infrastructure.

BACKGROUND AND ANALYSIS:

Pinnacle Development, the responsible party for completing the water infrastructure extension on S. Bay Road for the new Caliber Collision business, has requested that all water infrastructure within the right- of-way be dedicated to the City of Dover for permanent ownership and maintenance. Attachment A outlines the entire water infrastructure associated with this project. The total construction value of the infrastructure is $161,670. Attachment B shows the general location and configuration of the infrastructure that is to be accepted. All work was completed in accordance with City standards and specifications. A one (1) year Maintenance Agreement and a Release of Liabilities has been submitted as part of the dedication process. Required as-built drawings of the infrastructure have been provided to staff.

27

Página 28

Item 1.
DEDICATION OF WATER INFRASTRUCTURE
S. BAY ROAD

ATTACHMENT A

The following is a list of all water infrastructure which are to be accepted by the City of Dover:

Water Utility Infrastructure (Construction Value = $161,670.00):

24” Steel Casing-156 l.f.
12” Tapping Sleeve & Valve-1 ea.
12” C900 DR18 Water Main-165 l.f.
6” Fire Hydrant Valve-1 ea.
Fire Hydrant-1 ea.
6” C900 DR18 Water Main-20 l.f.

28

Página 29

Item 1.

29

Página 30

Item 2.

CITY OF DOVER, DELAWARE

ACTION FORM

PROCEEDING: Council Committee of the Whole (Utility) DEPARTMENT OF ORIGIN: Water & Wastewater SUBMITTED ON: February 27, 2026 PREPARED BY: Jason A. Lyon, P.E., Director of Water & Wastewater / Engineering Services REVIEWED BY: Sharon J. Duca, Asst City Manager & Patricia M. Marney, Controller / Treasurer

SUBJECT: Dedication of Water and Wastewater Infrastructure – Oak Shadows TIMETABLE: All water and wastewater infrastructure within the rights-of-way of the Oak Shadows development will become the responsibility of the City of Dover upon acceptance by City Council RELATED PROJECT: X ATTACHMENTS: Attachment A – List of all water and wastewater infrastructure. Attachment B – Map of Oak Shadows REFERENCE: X

EXPENDITURE REQUIRED: $0

AVAILABLE BUDGET: $0

FUNDING SOURCE (Dept./Page in CIP & Budget): N/A

STAFF RECOMMENDATION:

Acceptance of water and wastewater infrastructure within the rights-of-way of the Oak Shadows development. Dedication is to include all of the referenced water and wastewater infrastructure.

BACKGROUND AND ANALYSIS:

The Oak Shadows development started construction in the early 1990’s. This was intended to be a private community with the water and wastewater infrastructure to be dedicated to the City of Dover. Utility easements are recorded for the city to access the utilities. Lots within the development were developed slowly over the next thirty (30) years. Throughout the construction of this subdivision, the city provided punch list items to be addressed by the developer. The current Oak Shadows Homeowners Association has requested that all water and wastewater infrastructure within the development be dedicated to the City of Dover for permanent ownership and maintenance and addressed the punch list items. Attachment A outlines the entire water and wastewater infrastructure associated with this project. The total construction value of the infrastructure is $298,435 (based on 1994 prices – year of installation). Attachment B shows the general location and configuration of the infrastructure that is to be accepted. All work was completed in accordance with City standards and specifications. Required as-built drawings of the infrastructure have been provided to staff. 30

Página 31

Item 2.
DEDICATION OF WATER AND WASTEWATER INFRASTRUCTURE
OAK SHADOWS

ATTACHMENT A

The following is a list of all water and wastewater infrastructure which are to be accepted by the City of Dover:

Wastewater Utility Infrastructure (Construction Value = $170,010 – 1994 Prices):

8” SDR-35 PVC Sanitary Sewer Main-3,270 l.f.
6” PVC Sanitary Sewer Laterals (29)-932 l.f.
5’ Diameter Manholes (15)-150 v.f.

Water Utility Infrastructure (Construction Value = $128,425 – 1994 Prices):

8” Ductile Iron Pipe (Class 52 Cement Lined) Water Main-3,969 l.f.
1” Copper Water Services (29)-773 l.f.
6” Ductile Iron Pipe (Class 52 Cement Lined) Water Main-113 l.f.
8” Gate Valve-11 ea.
6” Gate Valve (Fire Hydrant)-4 ea.
Fire Hydrant-4 ea.

31

Página 32

Item 2.

32

Volver a esta reunión