SLC Agenda Sept 2 meeting packet
Parks, Recreation, and Community Enhancement Committee. 2 septanm 2020.
Yo rale tèks sa a nan PDF la otomatikman, epi li ka gen erè. PDF la se dosye ofisyèl la, kidonk tcheke l anvan ou konte sou sa a.
Paj 1
SILVER LAKE COMMISSION
September 2, 2020
5:30 PM
This meeting will be held electronically.
Public participation information is as follows:
Dial: 1‐408‐418‐9388
Access Code: TBD
Event password: DOVER‐SLC
Meeting Link: https://cityofdoverde.webex.com/cityofdoverde/j.php?MTID=me7d5b1cb60b426d8463b7ad7bfdfda04
AGENDA
1. Welcome/Call to order
2. Approval of June 2020 meeting minutes
3. Kent County Public Works, Sewer Main Update
4. Parks Projects and Maintenance Crew Updates
5. Park & Playground Improvement Project (Silver Lake Park projects)
6. New Business
7. Adjournment
Paj 2
Silver Lake Commission
June 10, 2020
5:30 PM / Via Webex Meeting
* DRAFT *
Members On the Call Others On The Call
Tricia Arndt Carolyn Courtney, COD Parks & Recreation Staff
Zach Carter Andrew Howard, Environmental Scientist, DNREC
Robin Eaton Andi Riggi, Asst. Planning Director, Kent County Public Works
Lyle Jones
Marie Kozel
Michael Lewis
WELCOME & CALL TO ORDER
The meeting was called to order at 5:30 PM.
INTRODUCTIONS
Those on the call identified themselves.
AGENDA
The Agenda was presented and accepted without change.
MINUTES
The Chair called for a motion to accept the minutes. An edit was suggested for “DRNEC” to “DNREC”. Ms. Kozel motioned to
accept and Mr. Carter seconded the motion. Without objection the motion passed.
KENT COUNTY PUBLIC WORKS, SEWER MAIN UPDATE
Mr. Riggi’s update noted that in April we completed the inspection of over 80% of the pipe from Route 13 to County Pump
Station at E Water Street. We found we need to replace approximately 1400 feet from Silver Lake Park to Oak Lane and 1000
feet behind Legislative Hall.
The plan is to start in the park area north of Lewis Mill Drive and to replace the pipe from there to Oak Lane the end of
June. The work will not be completed in the park until the entire line is installed and tested. Once the line is tested, we will
return to the park and make the final connection and complete the restoration. The work around the Silver Lake Park should be
completed by the end of July. We will be providing construction fencing and construction signs around the equipment and
work area as previously requested. Once this is complete the crew will move to Martin Luther King Boulevard and replace the
force main from the north side of roadway to E Water Street south of the DelOne Credit Union. We will also have to replace a
manhole near the intersection of Kings Highway NE and E Division in the park area.
Mr. Eaton noted the city would be installing fiber in this area and recommended that utilities are marked prior to any digging.
COUNCIL COMMITTEE AS A WHOLE
The chair shared her update to the Parks & Recreation Community Enhancement/Council Committee as a Whole. She provided
them with a summary of our efforts here on the SLC. She felt it was well received.
PARKS PROJECTS AND MAINTENANCE CREW UPDATES/PARKS & PLAYGROUND IMPROVEMENT PROJECT
Mr. Eaton reported the volleyball court area at Silver Lake was coming along and should be completed soon. He noted an
additional piece of playground equipment had been installed at the playground and playground mulch had been recently been
added. The city will be meeting with the Coastal Design Studio staff to coordinate efforts of the beach area.
Mr. Jones noted someone had came to him regarding sections of the park without enough benches.
ADJOURNMENT
With no further business, the meeting adjourned at 6:30 PM