Ale nan kontni prensipal la
AskDover

Entèlijans atifisyèl (AI) tradui paj sa a. Pèsonn pa revize li, e li ka gen erè. Gade vèsyon angle a

SLC March 9 2022 packet

Parks, Recreation, and Community Enhancement Committee. 9 mas 2022.

Louvri PDF la (9.6 MB)

Yo rale tèks sa a nan PDF la otomatikman, epi li ka gen erè. PDF la se dosye ofisyèl la, kidonk tcheke l anvan ou konte sou sa a.

4 paj pa gen anpil tèks ou ka li isit la, oswa yo pa gen ditou, souvan paske se eskanè oswa desen. Gade PDF la pou sa yo.

Paj 1

SILVER LAKE COMMISSION March 9, 2022 5:30 PM Large Conference Room Dover City Hall AGENDA 1. Welcome/Call to order 2. Member & Staff Introductions 3. Review Silver Lake Resolution, Nominate & Select Chairperson 4. Consideration of Application S‐22‐03 Restaurant at 801 N. State Street 5. Update on Silver Lake Park Projects & Maintenance Crew Updates 6. Spring Clean Up Events 7. Adjournment THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C. §10004(E)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING.

Paj 5

City of Dover Zoning Ordinance, Article 5 Section 11.251 11.251 Silver Lake. All Site Plan, Conditional Use Site Plan, or Subdivision applications for parcels where any boundary of the parcel is abutting Silver Lake are required to go before the Silver Lake commission prior to appearing before the planning commission. The Silver Lake commission shall provide advisory comments for the planning commission on such applications.

Paj 6

Area Building Area: 6774 SF Covered Patio: 907 SF Tortilla Making Merch. Storage Storage Office Mechanical 119 Dish Room 113 114 116 117 Retail/To Go 102 112 Seats Entry 101 Dining: 212 Wait Support 111 Bar Seats: 24 Total: 236 Tortilla Dining 103 Cooler c Kitchen Mens Prep & Pickup Prep Dry Goods/Commisary 109 104 110 115 118 Womens 105 Freezer b Main Dining 106 Keg Cooler a Private Event 107 El Azteca Dover 3 Season Bar Patio Bar 002 108 Event Patio 001 Floor Plan & Renders Level 1 Copy 1 1 1/8" = 1'-0" REV REV DATE DESCRIPTION Firm Name and Address : Lighthouse Construction, Inc. 859 Golf Links Lane, Suite 1 Magnolia, DE Project Name and Address : El Azteca Dover 801N State Street Dover, De 19901 Project : Sheet : El Azteca Dover Date : Issue Date A100 Front Entrance Outdoor Dining 2 3 Scale : 12" = 1'-0" 12" = 1'-0" As indicated

Paj 8

P:\Lighthouse\El Azteca\PRELIMINARY\EXISTING CONDITIONS.dwg Feb 04 , 2022 - 9:50am resd DAVIS, BOWEN & FRIEDEL, INC. ARCHITECTS ENGINEERS SURVEYORS

Paj 9

P:\Lighthouse\El Azteca\PRELIMINARY\PRELIMINARY PLAN.dwg Feb 04 , 2022 - 9:51am resd 0 20 40 60 DAVIS, BOWEN & FRIEDEL, INC. ARCHITECTS ENGINEERS SURVEYORS

Paj 10

P:\Lighthouse\El Azteca\PRELIMINARY\PRELIMINARY PLAN.dwg Feb 04 , 2022 - 9:52am resd 0 20 40 60 DAVIS, BOWEN & FRIEDEL, INC. ARCHITECTS ENGINEERS SURVEYORS

Paj 11

Silver Lake Park ‐ Scheduled Clean Up Events March 12 Holy Cross Honor Roll Students 8 am March 19 The Legion of Anglers 8 am April 9 Holy Cross Honor Roll Students 8 am Members of the Commission are invited out to participate with these groups. Usually, they are here from 8 am – Noon. Some pics of previous clean up events:

Tounen nan reyinyon sa a