SLC March 9 2022 packet
Parks, Recreation, and Community Enhancement Committee. Mar 9, 2022.
This text was pulled from the PDF automatically and may contain mistakes. The PDF is the official record, so check it before relying on this.
4 pages have little or no readable text here, often scans or drawings. See the PDF for those.
Page 1
SILVER LAKE COMMISSION
March 9, 2022
5:30 PM
Large Conference Room
Dover City Hall
AGENDA
1. Welcome/Call to order
2. Member & Staff Introductions
3. Review Silver Lake Resolution, Nominate & Select Chairperson
4. Consideration of Application S‐22‐03 Restaurant at 801 N. State Street
5. Update on Silver Lake Park Projects & Maintenance Crew Updates
6. Spring Clean Up Events
7. Adjournment
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO 29 DEL. C.
§10004(E)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION OR THE DELETION
OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE TIME OF THE MEETING.
Page 5
City of Dover Zoning Ordinance, Article 5 Section 11.251
11.251 Silver Lake. All Site Plan, Conditional Use Site Plan, or Subdivision applications for parcels where any
boundary of the parcel is abutting Silver Lake are required to go before the Silver Lake commission prior to
appearing before the planning commission. The Silver Lake commission shall provide advisory comments for
the planning commission on such applications.
Page 6
Area
Building Area: 6774 SF
Covered Patio: 907 SF
Tortilla Making
Merch. Storage Storage Office Mechanical
119
Dish Room 113 114 116 117
Retail/To Go
102
112
Seats
Entry
101 Dining: 212
Wait Support
111 Bar Seats: 24
Total: 236
Tortilla Dining
103
Cooler
c
Kitchen
Mens Prep & Pickup Prep Dry Goods/Commisary
109
104 110 115 118
Womens
105 Freezer
b
Main Dining
106
Keg Cooler
a
Private Event
107
El Azteca Dover
3 Season Bar Patio
Bar 002
108
Event Patio
001
Floor Plan & Renders
Level 1 Copy 1
1
1/8" = 1'-0"
REV REV DATE DESCRIPTION
Firm Name and Address :
Lighthouse Construction, Inc.
859 Golf Links Lane, Suite 1
Magnolia, DE
Project Name and Address :
El Azteca Dover
801N State Street
Dover, De 19901
Project : Sheet :
El Azteca Dover
Date :
Issue Date A100
Front Entrance Outdoor Dining
2 3 Scale :
12" = 1'-0" 12" = 1'-0" As indicated
Page 8
P:\Lighthouse\El Azteca\PRELIMINARY\EXISTING CONDITIONS.dwg Feb 04 , 2022 - 9:50am resd
DAVIS,
BOWEN &
FRIEDEL, INC. ARCHITECTS ENGINEERS SURVEYORS
Page 9
P:\Lighthouse\El Azteca\PRELIMINARY\PRELIMINARY PLAN.dwg Feb 04 , 2022 - 9:51am resd
0
20
40
60
DAVIS,
BOWEN &
FRIEDEL, INC. ARCHITECTS ENGINEERS SURVEYORS
Page 10
P:\Lighthouse\El Azteca\PRELIMINARY\PRELIMINARY PLAN.dwg Feb 04 , 2022 - 9:52am resd
0
20
40
60
DAVIS,
BOWEN &
FRIEDEL, INC. ARCHITECTS ENGINEERS SURVEYORS
Page 11
Silver Lake Park ‐ Scheduled Clean Up Events
March 12 Holy Cross Honor Roll Students 8 am
March 19 The Legion of Anglers 8 am
April 9 Holy Cross Honor Roll Students 8 am
Members of the Commission are invited out to participate with these groups. Usually, they are here
from 8 am – Noon.
Some pics of previous clean up events: