Page 1
CITY OF DOVER, DELAWARE
COUNCIL COMMITTEE OF THE WHOLE MEETING
Tuesday, September 29, 2026 at 6:00 PM
City Hall Council Chambers, 15 Loockerman Plaza, Dover, Delaware
AGENDA
Public comments are welcomed on any item and will be permitted at the appropriate time. When possible,
please notify the City Clerk (302-736-7008 or email at cityclerk@dover.de.us) should you wish to be
recognized.
VIRTUAL MEETING NOTICE
This meeting will be held in City Hall Council Chambers with electronic access via
WebEx. Public participation information is as follows:
Dial: 1-650-479-3208
Link: https://shorturl.at/Toxaw
Event number: 2534 025 9491
Event password: DOVER (if needed)
If you are new to WebEx, get the app now at https://www.webex.com/ to be ready when the meeting
starts.
CALL COUNCIL COMMITTEE OF THE WHOLE MEETING TO ORDER
ADOPTION OF AGENDA
PRESENTATION
1. Booted and Suited (Bobby Wilson, CEO and Founder)
PARKS, RECREATION, AND COMMUNITY ENHANCEMENT COMMITTEE
ADOPTION OF THE AGENDA
1. Consideration of Withdrawal and Reallocation of CDBG Funds for People's Community
Center Renovation Project (Debbie O'Brien, Community Development Manager)
(Staff Recommendation: Approve the withdrawal of the previously approved $40,000
CDBG allocation for the People's Community Center Renovation Project and direct staff to
make the funds available through the 2027 Annual Action Plan Process.
1
Page 2
COUNCIL COMMITTEE OF THE WHOLE MEETING - September 29, 2026 PAGE 2
ADJOURNMENT OF THE PARKS, RECREATION, AND COMMUNITY ENHANCEMENT
COMMITTEE MEETING
SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
ADOPTION OF THE AGENDA
1. Update on Safety Concerns on East Loockerman Street (Jason Lyon, Assistant City
Manager)
(Staff Recommendation: Approval of the installation of a Do Not Enter/Emergency and
Authorized Vehicles Only sign)
2. Loockerman Plaza Pedestrian Improvements Update (Paul Moser, DelDOT, and Jason
Lyon, Assistant City Manager)
(Committee Action Not Required)
ADJOURNMENT OF THE SAFETY ADVISORY AND TRANSPORTATION COMMITTEE
MEETING
LEGISLATIVE, FINANCE, AND ADMINISTRATION COMMITTEE
ADOPTION OF THE AGENDA
1. Get Work Foundation Presentation – Youth Sports and Community Center Feasibility
Study Proposal (Danté Daniel, Chief Operating Officer, and Terez Trott, Chief Executive
Officer)
(Committee Action Not Required)
2. Proposed Resolution No. 2026-12 - Implementing Recommendations of the Independent
Investigation and Review Conducted by 21CP Solutions (Councilman Anderson)
(Staff Recommendation: Adoption of Proposed Resolution No. 2026-12)
3. Community Riverwalk Assessment Grant (Jason Lyon, Assistant City Manager)
(Staff Recommendation: Authorize the City Manager to enter into an agreement with the
Downtown Dover Partnership for the allocation of the applicable grant funding)
ADJOURNMENT OF THE LEGISLATIVE, FINANCE, AND ADMINISTRATION
COMMITTEE MEETING
ADJOURNMENT OF THE COUNCIL COMMITTEE OF THE WHOLE
THE AGENDA ITEMS AS LISTED MAY NOT BE CONSIDERED IN SEQUENCE. PURSUANT TO
29 DEL. C. §10004(e)(2), THIS AGENDA IS SUBJECT TO CHANGE TO INCLUDE THE ADDITION
OR THE DELETION OF ITEMS, INCLUDING EXECUTIVE SESSIONS, WHICH ARISE AT THE
TIME OF THE MEETING
2
Page 3
Item 1.
3
Page 4
Item 1.
4
Page 5
Item 1.
5
Page 6
Item 1.
6
Page 7
Item 1.
7
Page 8
Item 1.
8
Page 9
Item 1.
9
Page 10
Item 1.
10
Page 11
Item 1.
11
Page 12
Item 1.
12
Page 13
Item 1.
13
Page 14
Item 1.
14
Page 15
Item 1.
15
Page 16
Item 1.
16
Page 17
Item 1.
17
Page 18
Item 1.
18
Page 19
Item 1.
19
Page 20
Item 1.
20
Page 21
Item 1.
21
Page 22
Item 1.
22
Page 23
Item 1.
23
Page 24
Item 1.
24
Page 25
Item 1.
25
Page 26
Item 1.
26
Page 27
Item 1.
ACTION FORM
PROCEEDING: Council Committee of The Whole (Parks, Recreation, and Community Enhancement)
DEPARTMENT OF ORIGIN: Planning, Inspections & Community Development
DATE SUBMITTED: 8/20/26
PREPARED BY: Debbie O’Brien, Community Development Manager
SUBJECT: Consideration of Withdrawal and Reallocation of CDBG Funds for People's Community Center
Renovation Project
REFERENCE: N/A
RELATED PROJECT: N/A
REVIEWED BY: Sharon J. Duca, P.E., ICMA-CM, City Manager
EXHIBITS: Exhibit A – Project Timeline
EXPENDITURE REQUIRED: There is no impact on the City's CDBG entitlement funding.
AMOUNT BUDGETED: $40,000
FUNDING SOURCE (Dept./Page in CIP & Budget): 2025 CDBG Entitlement Grant
TIMETABLE: Pending Council approval, staff will take the necessary administrative and contractual actions
to discontinue the project, discontinue the environmental review process without submitting the Request for
Release of Funds (RROF) to HUD. Staff will follow the amendment procedures established in the City's
Citizen Participation Plan.
RECOMMENDED ACTION: Staff recommends that City Council withdraw the previously approved
$40,000 CDBG allocation for the People's Community Center Renovation Project and direct staff to make the
funds available for consideration through the 2027 Annual Action Plan process.
BACKGROUND AND ANALYSIS
In the 2025–2029 Consolidated Plan and 2025 Annual Action Plan, the City of Dover allocated $40,000 in U.S.
Department of Housing and Urban Development (HUD) Community Development Block Grant (CDBG) funds
to People's Community Center, with the allocation unanimously approved by City Council through the Consent
Agenda on April 28, 2025. The funding was intended to renovate a portion of the homeless shelter to create
private and group meeting space for case management and supportive services for individuals experiencing
homelessness. During the environmental review process, staff determined that a Phase I Environmental Site
Assessment was necessary to evaluate potential environmental contamination in accordance with 24 CFR
58.5(i)(2). Upon completion of the Environmental Review Record (ERR), HUD regulations require publication
of a Notice of Intent to Request Release of Funds (NOI/RROF) and an opportunity for public comment before
submitting the RROF to HUD, consistent with 24 CFR 58.43 and the City's Citizen Participation Plan (CPP).
Comments received during the public comment period prompted additional staff review, which identified
several programmatic, procurement, contractual, compliance, and project implementation concerns that call into
question the project's feasibility and ability to achieve its intended CDBG objectives. Staff subsequently
consulted with HUD and the City Solicitor regarding available options. HUD confirmed that the decision to
proceed with or discontinue a CDBG-funded activity is a local decision and that, because the Request for
Release of Funds has not been submitted, the City may discontinue the environmental review process if it elects
not to proceed. Any reallocation of the funds would be subject to the amendment procedures established in the
City's CPP.
27
Page 28
Item 1.
Exhibit A – Project Timeline
People's Community Center (PCC) – CDBG Renovation Project
Date Event
City Council approved the 2025 Annual Action Plan, including a $40,000
4/28/2025 CDBG allocation to PCC for renovations to create private and group meeting
space for case management and supportive services.
9/17/2025 Staff initiated the Environmental Review Record (ERR) for the project.
9/24/2025 Sub-recipient agreement was fully executed.
Staff notified the sub-recipient of the City's procurement requirements,
10/7/2025 including the requirement to obtain at least 3 price quotations for purchases
exceeding $10,000.
During the environmental review, staff notified the sub-recipient that a Phase
11/4/2025 I Environmental Site Assessment was necessary due to the age, location, and
proposed use of the property.
The Phase I Environmental Site Assessment was completed, allowing the
1/27/2026
environmental review process to proceed.
PCC submitted an invoice and proof of payment for reimbursement.
Although an explanation was provided regarding the solicitation of only two
6/11/2026 contractor quotations, the procurement documentation provided appeared
incomplete, and the additional quotation requested by staff was not
provided.
The first Notice of Intent to Request Release of Funds (NOI/RROF) was
6/12/2026
published with an erroneous public comment date.
The corrected Notice of Intent to Request Release of Funds (NOI/RROF) was
6/23/2026
published, initiating the required public comment period
In response to issues identified during the public comment period, staff
conducted a comprehensive review of the project and supporting
6/23-30/2026 documentation. The review identified concerns regarding project feasibility,
prior funding history, procurement documentation, contractual provisions,
and the project's ability to achieve its intended CDBG national objective
Page 1 of 2
28
Page 29
Item 1.
Exhibit A – Project Timeline
People's Community Center (PCC) – CDBG Renovation Project
Date Event
within a reasonable timeframe. Staff subsequently consulted with HUD and
the City Solicitor regarding available options.
HUD confirmed that the decision whether to continue or discontinue the
project is a local decision and advised that any decision should be based on
6/30/2026
programmatic, contractual, compliance, procurement, and implementation
considerations.
6/30/2026 The sub-recipient agreement expired and was not extended.
Page 2 of 2
29
Page 30
Item 1.
Update of Safety Concerns
on East Loockerman Street
City of Dover
Safety Advisory and Transportation Committee
September 29, 2026
30
Page 31
Item 1.
Summary of January 27, 2026 Discussion
• Committee provided direction to achieve a temporary
closure.
• While the road has temporary closure, perform studies
for potential traffic calming implementation
• Provide the Committee with a recommendation for long
term solution
31
Page 32
Item 1.
Temporary Closure
• Temporary closure was installed in
July of 2026
• Flyers were distributed to each
property owner in the affected area
in advance of the closure
• Closure was posted on social media
32
Page 33
Affected Area
Item 1.
33
Page 34
Impacts of Temporary Closure
Item 1.
34
Page 35
Impacts of Temporary Closure
Item 1.
35
Page 36
Item 1.
Considerations
• City staff conducted traffic analysis in mid August
• Percentage of enforceable violations decreased 4% during
the temporary road closure
• 85th percentile speed decreased 4 mph
• Fastest speed decreased 6 mph
• With closure implemented, a potential 1-2 minute response
delay could be anticipated
• Staff received concerns from residents on emergency
vehicle response time
• Staff did not receive any complaints about access to
development from property owners during study period
36
Page 37
Item 1.
Recommendations
• Install a Do Not Enter / Emergency
and Authorized Vehicles Only for
eastbound traveling motorists
• Would allow emergency vehicles an
alternative route to decrease
response time
• This signage is enforceable under 21
Del. C. § 4107
• Economical and effective solution to
the current condition
• Would act like an emergency
turnaround access on highway
37
Page 38
Recommendation
Item 1.
38
Page 39
Item 2.
Council Committee of the Whole:
Loockerman Plaza Sidewalk and Crosswalk
Tuesday, September 29, 2026
Presented by Paul Moser, PE
39
Page 40
1 Project Background
Item 2.
• Identified gaps in sidewalks and bike lanes,
Downtown focusing on creating a connected, low-stress
network for cyclists and pedestrians
Dover • Focused on reducing vehicular speeds and adding
high-visibility crosswalks
Pathways • Conducted public workshops and charrettes with
residents, businesses, and officials
Plan • Developed specific concepts for improving the
corridor to enhance walkability and integrate
July 2024 infrastructure
40
Page 41
2 DelDOT Capital Project Objectives
Item 2.
• Safety
– Reduce vehicular travel lane
widths
– Install high visibility crosswalk with
Rectangular Rapid Flashing
Beacon (RRFB)
– Crossover modifications
– Curb extensions time improve
safety at intersections RRFB Example
• Connectivity
– Fill sidewalk gap
– Improve bus stops
• Streetscape
– Median landscaping
improvements
South side of Loockerman Plaza, looking east
41
Page 42
3 DelDOT Capital Project Objectives
Item 2.
42
Page 43
4 DelDOT Capital Project Objectives
Item 2.
Library Crossing
• Curb extensions to reduce the
pedestrian crossing distance
and calm traffic
• Extend median to fit sidewalk
• New bus stop with in-lane
boarding
• Rectangular rapid flash
43
beacon (RRFB)
Page 44
5 DelDOT Capital Project Objectives
Item 2.
New Loockerman Sidewalks
• Median widened to include a new
sidewalk and grass buffer
• Curb ramps and crosswalks for
better crossing of Federal Street
• Keeps existing parking spaces
44
Page 45
6 DelDOT Capital Project Objectives
Item 2.
Town Hall Crosswalk
• New crosswalk added on
the far side of the Town
Hall intersection
• Median extended to fit
new sidewalk
45
Page 46
7 Anticipated Project Schedule
Item 2.
Summer
Meet with 2026 Fall 2026
Stakeholders Preliminary Semi-Final Early 2027
(ongoing) Design Design PS&E
Spring Fall 2026 Winter
2026 Public 2026/2027
Survey, Workshop Final Design
Data
Collection,
Concept
Development
46
Page 47
8 Public Workshop
Item 2.
Have not yet confirmed details:
• Placeholder date: November 10th
• Location: Any ideas?
47
Page 48
9 Project Contact
Item 2.
Paul Moser, PE
Paul.Moser@delaware.gov
48
Page 49
Item 1.
YOUTH SPORTS &
PERFORMANCE CENTER
A responsible first step for Dover
City of Dover • September 29, 2026
Prepared by Get Work Foundation
Terez Trott, MHRM • Chief Executive Officer
Danté Daniel, Ph.D., M.S.W. • Chief Operating Officer
Sports • Education • Workforce • Wellness •
THE REQUEST: FUND THE INDEPENDENT STUDY Economic Development
49
Page 50
THE ASK Item 1.
The decision before Council is simple
UP TO
● Test real community and sports-tourism demand.
$50,000 ● Compare sites, scale, capital costs and operating costs.
Independent market, ● Measure visitor spending, jobs, municipal revenue and
financial-feasibility & public risk.
economic-impact study
● Identify state, federal, philanthropic and private funding
strategies.
Economic Development Fund
● Return to Council with public findings before any major
No commitment to construction. commitment.
The study can recommend: proceed • modify • phase • relocate • stop
Source: Get Work Foundation Business Plan & Feasibility Study Proposal (Aug. 2026), pp. 2–3, 22–25. 50
GET WORK FOUNDATION 2
Page 51
THE STUDY Item 1.
What is a market, financial & economic feasibility study?
Independent due diligence that tests whether the project is needed, financially realistic, and
beneficial to Dover.
MARKET FEASIBILITY FINANCIAL FEASIBILITY ECONOMIC IMPACT
Is there enough real Can it operate What value could Dover
demand? responsibly? receive?
Residents, teams, leagues & Capital costs and operating Visitor trips and hotel room
tournaments costs nights
Right facility size, site & amenity Revenue model, pricing and Local spending, jobs and
mix utilization business activity
Competitive position in the Subsidy exposure and Municipal revenue and return
region sustainability on investment
The study turns a promising idea into an evidence-based decision: proceed, modify,
phase, relocate — or stop.
It is not a construction commitment. It is the fact-finding step before larger public
decisions.
51
Source: GWF Business Plan & Feasibility Study Proposal, pp. 22–23. Study scope includes demand, site, costs, revenues, public risk, visitor spending, jobs and municipal revenue.
GET WORK FOUNDATION
Page 52
COMMUNITY VOICE Item 1.
Dover residents have already told us this is worth exploring
609 95.9% 89.7%
Community Vision Survey responses Support exploring the Center Likely household use
597 respondents were Delaware residents. 584 of 609 selected Support or Strongly Support. 546 respondents said Likely or Very Likely.
What residents said matters most
Youth sports & recreation 79.0%
The community case begins
A safer community 48.9% with residents — not
tourism.
After-school programming 39.1%
Health & wellness 33.3%
Workforce development 32.2%
Source: Get Work Foundation Community Vision Survey summarized in Business Plan, pp. 6–8. 52
GET WORK FOUNDATION 4
Page 53
PREVENTION Item 1.
Crime data are a warning signal — not a causal claim
Kent County juvenile arrests
Accountability matters.
651 But punishment alone is not prevention.
460 National Institute of Justice research finds that increasing the
severity of punishment does little to deter crime; certainty of being
caught is generally more influential.
302
So, the Center should be evaluated as one part of a broader
prevention ecosystem:
● after-school structure and safe recreation
● mentoring and leadership development
● conflict-resolution and social-emotional skills
● paid youth employment and apprenticeship pathways
2021 2022 2023 ● academic, career and family support connections
Arrests are not a count of unique youth.
Sources: GWF Business Plan, p. 4; National Institute of Justice, “Five Things About Deterrence” (2016); CDC Youth Violence Prevention. 53
GET WORK FOUNDATION 5
Page 54
WHAT PREVENTION LOOKS LIKE Item 1.
A building is not the intervention — the programming is
1 2 3 4 5
AFTER-SCHOOL MENTORING SKILLS WORK CONNECTION
Paid jobs, internships,
Sports, tutoring, safe Consistent prosocial Leadership, conflict Schools, health, family
apprenticeships,
social time adult relationships resolution, SEL & service partners
training
CDC and OJJDP identify mentoring, after-school programming, skills development, safe spaces and employment pathways
among evidence-supported approaches that can reduce risk and strengthen youth outcomes.
Sources: CDC Community/Youth Violence Prevention resources; OJJDP Mentoring; OJJDP evaluation of One Summer Chicago Plus. 54
GET WORK FOUNDATION 6
Page 55
FACILITY CONCEPT Item 1.
A year-round facility built for both residents and events
COURT SPORTS INDOOR TURF TRAINING ICE
8+ hardwood courts
2+ turf fields Strength • Performance Ice rink
Basketball • Volleyball • Pickleball
Futsal • Football • Clinics Baseball / Softball training Skating • Hockey
• Wrestling • Cheerleading
EDUCATION WORKFORCE WELLNESS GOLF
Fitness • Walking • Senior Virtual golf / simulator
Tutoring • Mentoring Internships • Certifications
Health screenings • Adaptive bays
Classrooms • Career readiness Event operations • Hospitality
sports Potential add-on to test
The feasibility study will determine the appropriate facility size, amenity mix, and revenue model—including whether features like golf
simulators can generate sustainable year-round income through adult recreation, leagues, corporate events, and off-peak use.
Source: GWF Business Plan, pp. 8–10. Golf simulator concept added for feasibility testing based on GWF presentation notes. 55
GET WORK FOUNDATION 7
Page 56
SPORTS TOURISM Item 1.
Dover already understands destination sports
“Dover already understands the economic
impact of NASCAR. Now imagine generating a
fraction of that visitor traffic every other
weekend, year-round.”
NASCAR The study tests whether youth tournaments, showcases and
regional events can create a smaller but recurring version of
that visitor activity.
A proven Dover visitor economy
Regional drive-time market
Source: GWF Business Plan, pp. 6, 13, 16. Map reproduced from the proposal. 56
GET WORK FOUNDATION 8
Page 57
STATE STRATEGY Item 1.
Delaware already treats sports tourism as economic
development
A dedicated capital fund proves the Recent statewide economic activity
point 2023 Delaware sports tourism impact
$10M $257.9M
direct spending
$403.2M
total business sales
allocated again for the FY26 Sports Tourism
Capital Investment Fund round
The fund supports new or existing sports 3,075 $20.2M
facilities that host events, attract out-of- part-time & full-time jobs state & local taxes
state visitors, and contribute to state and
local economies.
For Dover, the study tests whether this project ● 1.1M sports travelers attended Delaware events in
can compete for state dollars and capture 2023.
recurring visitor activity.
● The first TEAMS event-sponsorship year produced an
estimated $75M economic impact.
Sources: Delaware Tourism Office / Visit Delaware Sports Tourism Capital Investment Fund; Delaware Sports Tourism Economic Impact Study; TEAMS Program announcement. Future funding depends on state appropriations and 57
eligibility.
GET WORK FOUNDATION
Page 58
ILLUSTRATIVE SCENARIOS Item 1.
What could recurring sports tourism mean for Dover?
Planning scenarios from the proposal — not forecasts
INITIAL ESTABLISHED HIGH-PERFORMING
10 tournaments 16 tournaments 20 tournaments
5,120 13,824 25,600
non-local traveler trips / year non-local traveler trips / year non-local traveler trips / year
$1.08M $2.90M $5.38M
annual direct visitor spending annual direct visitor spending annual direct visitor spending
Visitor spending is separate from facility revenue such as rentals, admissions, concessions, memberships and sponsorships.
Source: GWF Business Plan, pp. 13–15. Estimates use statewide sports-traveler spending; a professional study must replace them with Dover-specific projections. 58
GET WORK FOUNDATION 10
Page 59
DOVER'S FISCAL REALITY Item 1.
A community project must also make fiscal sense
$7M ≈$23.3M $57.6M
FY2027 budget shortfall Dover had FY2027 total City spending plan Approx. balanced General Fund after
to close below FY2026 cuts and new revenue measures
That is exactly why this cannot be presented as a
“feel-good” project. REVENUE DEVELOPMENT
● The study must test whether the Center can attract new visitor
spending and recurring activity. The question is not whether the idea
sounds good.
● It must calculate jobs, hotel activity, business sales and potential The question is whether it can produce
municipal revenue — not just social benefits. measurable value for Dover.
● It must identify operating risk and any subsidy before Dover considers a
capital commitment.
Sources: City of Dover FY2027 budget; GWF Business Plan, pp. 19–23; Delaware Public Media / Spotlight Delaware FY27 budget coverage. The ≈$23.3M change is Citywide spending, not a General Fund loss. 59
GET WORK FOUNDATION 11
Page 60
PARTNERSHIP Item 1.
From separate assets to one Dover economic ecosystem
LOCAL GOVERNMENT
Infrastructure • policy • public safety • economic-
development tools
BUSINESS COMMUNITY
Dover Mall • Bally's • hotels • restaurants • retail •
entertainment
NONPROFITS + EDUCATION
Youth programming • workforce • mentoring • health
• colleges
CONCEPT ONLY — site, access and traffic improvements require independent engineering and feasibility review. REVENUE • SAFETY • COMMUNITY • YOUTH
Concept rendering provided by Get Work Foundation. GWF proposal calls for partnerships with hotels, restaurants, retailers, tourism organizations, education and healthcare partners. 60
GET WORK FOUNDATION 12
Page 61
STRATEGIC PARTNERSHIPS Item 1.
Delaware State University Partnership Pathway
Preliminary discussions point to a higher-education anchor for sports, workforce, events and
community impact.
Partnership areas discussed
DSU Indoor turf alignment: DSU had explored its own indoor turf
options; GWF’s concept could create a shared regional asset.
Internships: Event operations, coaching, hospitality, social work,
Verbal, tentative support data and program evaluation.
pending formal agreement Graduate-to-employment pipeline: Connect DSU students to
facility jobs, certifications and community programming, ultimately
A potential partner for retaining talent.
internships, career pathways,
indoor turf use and Land + convention center concept: President Tony Allen
event/convention activity. discussed possible land use if the Center includes
convention/event space.
Next step: the study should define the site, scale, operating model,
partner roles and agreement structure.
Sources: GWF meeting notes and preliminary DSU discussion; Delaware State University President page. Preliminary support is not a binding commitment. 61
GET WORK FOUNDATION
Page 62
INDEPENDENT DUE DILIGENCE Item 1.
Why we selected Victus Advisors
DELAWARE EXPERIENCE SPECIALIZED EXPERTISE
Completed a comparable sports-complex Market demand • financial feasibility • economic
feasibility study in Wilmington. impact • operations.
COST CERTAINTY INDEPENDENCE
Flat-fee structure provides a defined study cost Willing, if permitted, to serve as applicant/recipient
before work begins. so GWF does not control City study funds.
Selected after conversations with Victus Advisors, Sports Facilities Companies and Pinnacle Indoor Sports.
Source: GWF Business Plan, pp. 23–24. Victus reports 200+ sports/event venue studies in 40+ states. 62
GET WORK FOUNDATION 14
Page 63
FUTURE FUNDING Item 1.
The $50,000 study is not the capital plan
If the study supports moving forward, Dover should pursue a blended funding stack designed to minimize City exposure.
DELAWARE COMMUNITY REINVESTMENT FUND
Potential capital support for eligible nonprofit community, redevelopment and recreational-
health projects.
SPORTS TOURISM CAPITAL INVESTMENT FUND
State capital grants for sports facilities that attract out-of-state visitors and generate
economic impact.
STATE / LOCAL CAPITAL PARTICIPATION Bond Bill, direct capital appropriations, land, infrastructure, utilities or targeted cost-sharing.
PRIVATE + PHILANTHROPIC CAPITAL Naming rights, corporate sponsorships, foundations, major gifts and a future capital campaign.
EARNED REVENUE + FINANCING
Tournaments, rentals, memberships, camps, concessions and financing only after sustainability is
demonstrated.
The study should tell us which sources are realistic, what matching funds are required, and what the City should NOT finance.
Sources: Delaware General Assembly Community Reinvestment Fund (FY2027); Delaware Tourism Office Sports Tourism Capital Investment Fund; GWF Business Plan, p. 18. Funding is competitive and not guaranteed. 63
GET WORK FOUNDATION 15
Page 64
MOMENTUM Item 1.
FROM RELATIONSHIPS TO COMMUNITY IMPACT
Jordan Smith Jr.
A national basketball relationship with a powerful youth story
● Arkansas freshman guard and consensus elite 2026 recruit.
● Represented by Klutch Sports Group and signed to a New
Balance NIL partnership.
● CBS Sports projected him No. 2 overall in an early 2027 NBA
mock draft.
● National player-of-the-year honors and a platform that can
expose young people to elite sport, mentorship and brand
opportunity.
His father is here with us tonight — because this project is about bringing
Community engagement and youth giveaways are already underway. relationships, access and opportunity closer to young people in Dover.
Sources: CBS Sports (June 29, 2026); On3 / New Balance NIL coverage; Arkansas Razorbacks bio. Draft projections can change. 64
GET WORK FOUNDATION 16
Page 65
MOMENTUM Item 1.
New Balance sneaker, clothing & bookbag giveaway
Community engagement is already
happening
● Before any building is approved, Get Work Foundation
has already begun direct community engagement.
● The New Balance giveaway included sneakers, clothing
and bookbags for young people and families.
● Utility, grocery, and sports program enrollment financial
assistance.
● This shows how athlete and brand relationships can
create real, visible benefits in the community.
● The broader vision is not just a facility — it is ongoing
youth access, opportunity and support.
This is the kind of partnership-based, community-
facing work the Center can expand.
65
Source: Photo provided by Get Work Foundation. New Balance giveaway referenced by GWF materials.
GET WORK FOUNDATION
Page 66
PROCESS Item 1.
Phases from study to opening day
Tonight’s request funds Phase 1 — the facts needed before construction, debt, or operations funding is considered.
1 Feasibility Study Demand, site options, capital cost, operating model, economic impact and City risk.
2 Stakeholder / Investor Engagement Council, businesses, nonprofits, schools, funders and private investors.
Site control, design, permitting and buildout — only if public findings support the next
3 Construction step.
4 Operations Planning Governance, staffing, budget, safety plan, rental model and performance measures.
Program Development &
Youth sports, tutoring, mentoring, workforce, wellness and tournament programming.
5 Implementation
Launch, track usage and visitor activity, report outcomes and adjust based on real
6 Opening Day data.
Source: GWF Business Plan and Feasibility Study Proposal, pp. 22–23. Sequence reflects proposed project planning phases. 66
GET WORK FOUNDATION 16
Page 67
CLOSING Item 1.
We agree on the standard: fiscal responsibility, ROI and accountability
FISCAL RESPONSIBILITY RETURN ON INVESTMENT TRANSPARENCY & ACCOUNTABILITY
A limited study before any capital Independent demand, spending, Public findings • independent
commitment revenue and subsidy analysis consultant • future Council votes
“I believe it is our duty to safeguard public resources and invest in initiatives that
deliver clear, long-term benefits and savings to all residents.”
— Councilmember Brian E. Lewis, Jan. 23, 2026
We agree. The first responsible investment is the study. Approve up to $50,000
Sources: Councilman Brian E. Lewis op-ed, Jan. 23, 2026; GWF Business Plan and Feasibility Study Proposal. 67
GET WORK FOUNDATION 19
Page 68
Item 1.
THANK YOU Approve up to $50,000 for the independent study
68
Questions & discussion
Page 69
APPENDIX Item 1.
Backup: what the survey did — and did not — establish
WHAT IT ESTABLISHED WHAT IT DID NOT ESTABLISH
● Strong perceived need for more indoor sports and ● The final site or building size.
community recreation space.
● Construction cost or financing structure.
● Strong support for exploring the Center.
● Guaranteed tournament demand or hotel nights.
● A large pool of respondents reporting likely household
use. ● Operating sustainability or required subsidy.
● Priority outcomes: youth recreation, safety, after- ● A commitment by the City to build the project.
school programs, wellness and workforce development.
Source: GWF Business Plan, pp. 6–8. 69
GET WORK FOUNDATION 21
Page 70
APPENDIX Item 1.
Dover sits inside a large regional drive-time market
WHY ACCESS MATTERS
● Most youth tournament
travel is by car, van or team
bus.
● Route 1 and Route 13
connect Dover to Mid-Atlantic
markets.
● Hotels, parking, affordability
and commercial access matter
as much as airport proximity.
The feasibility study should
validate the actual capture
market and competition.
Source: GWF Business Plan, p. 16. 70
GET WORK FOUNDATION 22
Page 71
From: Brian Connolly
To: City Clerks Office
Subject: EXTERNAL: Public Comment for 9/29/26 Council Committee of the Whole Meeting
Date: Thursday, September 24, 2026 11:15:44 AM
Some people who received this message don't often get email from bconnolly@victusadvisors.com. Learn why this
is important
WARNING: This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Dear City Clerk,
Please accept the following public comment for the September 29th City Council meeting
regarding Get Work Foundation’s request for funding for a Youth Sports and Community
Center Feasibility Study.
--
Good evening, members of City Council.
My name is Brian Connolly, and I am the Managing Principal of Victus Advisors, a sports and
entertainment consulting firm that works with communities across the country on market and
economic feasibility analysis for sports and recreation facilities. Danté Daniel and Terez Trott
of the Get Work Foundation interviewed several sports feasibility firms before recommending
Victus Advisors for this assignment. I am grateful for the confidence they have placed in our
team following that process.
We have an extensive background with similar youth sports venue studies across the country,
but also direct experience here in Delaware. Victus Advisors conducted the market, financial,
and economic feasibility analysis for the Indoor Track Delaware project, which is now in
development in Wilmington. Through that work, we gained valuable familiarity with the
Delaware sports landscape, and with the careful analysis required to evaluate the market
needs, financial realities, and community benefits associated with projects of this nature.
Should this study in Dover move forward, we would be pleased to provide the City and the
Get Work Foundation with a thorough, rigorous, and objective examination of the opportunity
for a youth sports and community center in Dover. Our goal would be to give the City clear,
fact-based information about market demand, facility needs, financial feasibility, and potential
economic and community impacts so that future decisions can be made with the benefit of
sound analysis.
Thank you for the opportunity to provide this comment. We would welcome the chance to
bring our experience to Dover, and to work with the City and the Get Work Foundation on this
effort.
Sincerely,
Brian Connolly
Managing Principal
Victus Advisors
Page 72
Item 2.
City of Dover
MAYOR AND COUNCIL
PROPOSED COUNCIL RESOLUTION NO. 2026-12
A RESOLUTION IMPLEMENTING RECOMMENDATIONS OF THE INDEPENDENT
INVESTIGATION AND REVIEW CONDUCTED BY 21CP SOLUTIONS.
WHEREAS, City of Dover engaged 21CP Solutions to conduct an independent investigation and
review concerning matters involving the City, the Mayor and City Council, and the Dover Police
Department; and
WHEREAS, the independent investigation and review examined, among other matters, allegations
concerning interactions between elected City officials and DPD personnel, allegations concerning
secondary employment and use of the City-owned vehicle by the Chief of Police, and the
organizational context in which these matters arose; and
WHEREAS, 21CP Solutions made a series of recommendations intended to strengthen ethical
standards, accountability, transparency, conflict of interest safeguards, vehicle use practices,
employment practices, and administrative controls within the City and Dover Police Department; and
WHEREAS, the Mayor and Council recognize the importance of establishing clear and consistently
applied rules governing interactions between elected officials and city employees, investigations
involving senior City officials, City-owned vehicles, secondary employment, timekeeping, and non-
standard employment arrangements; and
WHEREAS, the Mayor and Council intend through this resolution to implement recommendations
from the 21CP independent investigation and review; and
WHEREAS, nothing in this resolution is intended to diminish the lawful authority of the Mayor, City
Council the City Manager or other City officials, or to interfere with legitimate governmental,
administrative, personnel, public-safety, or law-enforcement functions.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY
OF DOVER, DELAWARE:
SECTION 1. ADOPTION AND EXECUTION OF POLICY RECOMMENDATIONS.
The Mayor and City Council hereby approves and directs the immediate implementation of the
following administrative and operational mandates:
A. Political Activity Restrictions: The Dover Police Department and City Administration shall
establish an immediate policy prohibiting meetings regarding political matters between
elected City officials and Dover Police Department personnel while such personnel are on
duty and working in their official capacity as Dover Police Department officers.
B. Ethics Training Integration: The City’s Human Resources Department shall incorporate
the political meeting prohibition into its annual training on standards of ethical conduct.
71
P.O. Box 475 ❖ Dover, Delaware ❖19903
Community Excellence Through Quality Service
Page 73
Item 2.
C. Take Home Vehicle Policy: The City and Dover Police Department shall adopt a
comprehensive, written take-home policy establishing rigid parameters governing vehicle
eligibility, authorized usage, and a transparent, documented process for obtaining
administrative exceptions.
D. Secondary Employment Restrictions: The City shall adopt a written secondary
employment policy for command staff requiring advance disclosure of external work,
establishing clear conflict of interest management processes, and strictly prohibiting
secondary employment during regular City business hours without documented
compensatory leave.
E. Command Staff Timekeeping: The City shall establish uniform, transparent timekeeping
requirements for all command staff, including the Chief of Police, ensuring all hours are fully
verifiable by the City’s Human Resources Department rather than relying solely on self-
reporting to the mayor.
F. Employment Contract Formalization: The City shall ensure that any non-standard
employment arrangements negotiated between the Executive branch and senior City staff are
reduced to writing immediately, reviewed and approved by the City Solicitor, and filed
directly with the Human Resources Director.
SECTION 2. ACCOUNTABILITY AND REPORTING.
The City Manager and Chief of Police shall submit a joint progress report to the City Council within
sixty (60) days of the passage of this Resolution, outlining the specific policy drafts and timelines
required to bring the City into compliance with Section 1.
ADOPTED:
ROBIN R. CHRISTIANSEN FRED A. NEIL
MAYOR COUNCIL PRESIDENT
Actions History
09/29/2026 – Introduction – LF&A Committee
72
P.O. Box 475 ❖ Dover, Delaware ❖19903
Community Excellence Through Quality Service
Page 74
Item 3.
Downtown Dover Partnership
Main Street Dover
101 W. Loockerman Street, Ste 1A
Dover, DE 19904
(302) 678-2940
September 18, 2026
RE: Utilizing Funding from the DDP’s EPA Brownfield Multi-Purpose Grant to Support Restoration &
Revitalization of the City’s Public Works Facility (PWII)
Dear Council Members,
In 2024 the DDP received a $1,000,000 EPA Brownfield Multi-Purpose Grant to support the restoration &
revitalization of priority brownfields in Downtown Dover. Grant funding is available through 2029 to support
a variety of supplemental environmental site assessments, cleanup, and redevelopment planning activities.
Based on initial discussions with City staff, the DDP believes the City could benefit from utilizing the DDP’s EPA
Brownfield Multi-Purpose Grant funding to complete the following activities at the PWII site:
• Regulated Building Materials (RBM) Survey & Abatement Planning: There are several legacy structures at
the PWII site, including a brick building, greenhouse, sheds and two large inactive concrete pads. EPA
funding can be used to complete RBM Surveys and abatement plans (if necessary) to support future
removal and/or reuse of these structures.
• Restoration & Reuse Planning Activities: Previous discussions have included the potential of reactivating
the PWII site for a combination of stormwater management improvements & recreational purposes,
including a Riverwalk with adjoining amenities. However, the site is encumbered with environmental
impacts which need to be considered as part of restoration & reuse planning activities. EPA funding can
be used to develop a comprehensive site reuse plan that considers the environmental constraints and
includes stakeholder engagement and meaningful public input.
These activities could be entirely funded under the DDP’s grant at no cost to the City. If the City wishes to move
forward, the next steps in the process include:
• The City can decide to officially nominate the site for inclusion in the grant implementation process.
• The DDP would then seek EPA approval.
• Following EPA approval, the DDP would request the City’s support for implementing the approved
activities, including providing background documents, site access, and participating in the stakeholder
engagement & reuse planning activities.
Please let us know if you have any questions about this opportunity and/or would benefit from further
discussions. If you’d like to officially nominate the PWII site, please reach out to us at your earliest convenience.
Ken Anderson, Property Implementation Director
73